Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2004-02-25 4�JN`+ SANI)A))off
ORANGE COUNTY SANITATION DISTRICT
o,
February 19, 2004
F�
�)N
N
Phone: NOTICE OF MEETING
(714)962-2411
fax:
(7141 962-0356
www.ocsd.com
mailing address: BOARD OF DIRECTORS
P.O. Box8127 ORANGE COUNTY SANITATION DISTRICT
Fountain Valley,CA
92728-8127
street address:
10844 Ellis Avenue WEDNESDAY, February 25, 2004 — 7:00 P.M.
Fountain Valley,CA
92706-7018
Member Agencies DISTRICT'S ADMINISTRATIVE OFFICES
0 10844 Ellis Avenue
Cities Fountain Valley, California 92708
Anaheim
Brea
Buena Park
Cypress
Fountain Valley The Regular Meeting of the Board of Directors of the Orange County Sanitation
Fullerton Garden Grove District will be held at the above location, time and date.
Huntington Beach
Irvine
La Habra
La Palma ��
Los Alamitos
C
Newport Beach `-K-
. t
Orange Board Secreta'
Placentia
Santa Ana
Seal Beach
Stanton
Tustin
Villa Park
Yorba Linda OMTS COMMITTEE - Wednesday, March 3, 2004 at 5:00 p.m.
County of Orange
PDC COMMITTEE - Thursday, March 4, 2004 at 5:00 p.m.
Sanitary Districts
JOINT GROUNDWATER REPLENISHMENT
Costa Mesa SYSTEM COOPERATIVE COMMITTEE - Monday, March 8, 2004 at 5:30 p.m. @OCWD
Midway City
Water Districts FAHR COMMITTEE - Wednesday, March 10, 2004 at 5:00 p.m.
Irvine Ranch STEERING COMMITTEE - Wednesday, March 24, 2004 at 5:00 p.m.
CIP WORKSHOP - Wednesday, March 31, 2004 at 5:00 p.m.
To maintain world-class leadership in wastewater and water resource management.
a
�b
N
BOARD MEETING DATES
Board Meeting
March 24, 2004
April 28, 2004
May 26, 2004
June 23, 2004
*July 21, 2004
August 25, 2004
September 22, 2004
October 27, 2004
*November 17, 2004
*December 15, 2004
January 26, 2005
February 23, 2005
*Meetings are being held on the third Wednesday of the month
HAdept\admin\BS\Agenda12004 Meeting Notices\MN2.2.doc
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE: _February 25, 2004 TIME:_7:00 PM
(SIMONIAN) .................... ANDERSON................... ✓
(WILSON) ........................ BANKHEAD................... ✓
(MC GOWAN)................... BORTLE ................. .....
(SWAN) ............................ BRADY .........................
(YOST) ............................ CAMPBELL ...................
(AMBRIZ).......................... CAVECCHE................... ✓ s a-q
(GARCIA) CHRISTY..................... ✓
(CRANDALL).................... COLLINS ..................... ✓
(COERPER) .................... GREEN....................... ✓
(BROADWATER) ............. DALTON.......................
(SHAWVER) .................... DONAHUE.....................
(WILSON)......................... DUVALL...................... ✓
(UNDERHILL)................... ECKENRODE................
✓ —�
(SCHAFER)...................... FERRYMAN................... ✓
(POE)................................ JEMPSA......................
(DAVERT)......................... KAWASHIMA...............
(SHEA) ............................. KROM........................
(DOW) .............................. MARSHALL.................. ✓
(HERNANDEZ)................. MC CRACKEN............... ✓
(BEAUMAN) ..................... MOORE........................
(EPPERSON)................... NEUGEBAUER.............. ✓
(KEENAN) ........................ PIERCY........................
(W E B B) .............................F49GEWA-Y.................. ✓
(SMITH, CHUCK) ............. SILVA...........................
(HERMAN)........................ WALKER....................... ✓
STAFF: -r
Anderson
Beekman a
Ghirelli
1
Ludwin ✓ �,�
Miles
o T ✓ P�
omko ✓ �
Streed r/
OTHERS:
Woodruff ✓ �/ n ' C
Nixon I�
1/28/04
G:\wp.dta\admin\BS\DIRECTOR\Directors Roll Call.doc
a
AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
February 25, 2004—7:00 P.M.
Agenda Posting: In accordance with the requirements of California Government Code Section
54954.2,this agenda has been posted in the main lobby of the District's Administrative offices not
less than 72 hours prior to the meeting date and time above. All written materials relating to each
agenda item are available for public inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to
the Board for discussion and/or action, it will be done in compliance with Section 54954.2(b) as an
emergency item or because there is a need to take immediate action, which need came to the
attention of the Board subsequent to the posting of agenda, or as set forth on a supplemental
agenda posted in the manner as above, not less than 72 hours prior to the meeting date.
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible.
If you require any special disability related accommodations, please contact the Orange County
Sanitation District Board Secretary's office at (714) 593-7130 at least 72 hours prior to the
scheduled meeting. Requests must specify the nature of the disability and the type of
accommodation requested.
Items Continued: Items may be continued from this meeting without further notice to a Committee
or Board meeting held within five (5) days of this meeting per Government Code Section
54954.2(b)(3).
Meeting Adjournment: This meeting may be adjourned to a later time and items of business from
this agenda may be considered at the later meeting by Order of Adjournment and Notice in
accordance with Government Code Section 54955 (posted within 24 hours).
1. Invocation and Pledge of Allegiance
2. Roll Call
3. Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any. (See listing in Board Meeting folders)
City/Agency Active Director Alternate Director
Fullerton Don Bankhead Leland Wilson
Tustin Tony Kawashima Doug Davert
Board of Supervisors Jim Silva Charles V. Smith
4. Appointment of Chair pro tem, if necessary
02/25/04
Page 2
5. Public Comments: All persons wishing to address the Board on specific agenda items or
matters of general interest should do so at this time. As determined by the Chair,
speakers may be deferred until the specific item is taken for discussion and remarks
may be limited to three minutes.
Matters of interest addressed by a member of the public and not listed on this agenda
cannot have action taken by the Board of Directors except as authorized by Section
54954.2(b).
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair; consideration of Resolutions or commendations,
presentations and awards
Presentation by to Blake Anderson
b. Report of General Manager
C. Report of General Counsel
7. If no corrections or amendments are made, the minutes for the regular meeting held on
January 28, 2004 will be deemed approved as mailed and be so ordered by the Chair.
8. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 01/15/04 01/31/04
Totals $10,000,129.14 $16,639,786.91
DIRECTORS: Pursuant to Government Code Section 84308, you are required to disclose
any campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving OCSD. This requires that you identify the contributor by name.
Further, you may not participate in the decision making process to award a contract to such
party. For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with OCSD. For the specifics of Government Code Section 84308,
please see your Director's Handbook or call the office of General Counsel.
CONSENT CALENDAR
All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the
Consent Calendar by a Director, staff member or member of the public in attendance, there will
be no separate discussion of these items. All items on the Consent Calendar will be enacted
by one action approving all motions, and casting a unanimous ballot for resolutions included on
the consent calendar. All items removed from the Consent Calendar shall be considered in the
regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall, upon
recognition by the Chair, state their name, address and designate by number the item to be
removed from the Consent Calendar.
02/25/04
Page 3
The Chair will determine if any items are to be deleted from the Consent Calendar.
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. (1) Receive and file petition from Robert and Valerie Aronson requesting
annexation of 1.24 acres to Orange County Sanitation District, in the vicinity of
Meads Avenue and Orange Park Boulevard, in an unincorporated area of
Orange County; and,
tx
(2) Adopt Resolution No. OCSD 04-03, authorizing initiation of proceedings to
\IX annex said territory to OCSD (Proposed Annexation No. OCSD-39—Aronson
\v
Annexation).
b. (1) Receive and file petition from Gene Holle, G. Michael Smith and Gary Bryan
Warden requesting annexation of 1.17 acres to Orange County Sanitation
District, in the vicinity of Clark Street and Orange Park Boulevard, in an
unincorporated area of Orange County; and,
(2) Adopt Resolution No. OCSD 04-04, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD-40 — Holle
Annexation).
END OF CONSENT CALENDAR
10. Consideration of items deleted from Consent Calendar, if any.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE
Consent Calendar
a. Order draft Steering Committee Minutes for the meeting held on January 28,
2004 to be filed.
Non-Consent Calendar
b. Review and consideration of agenda items considered by the Steering
Committee re the February 25, 2004 meeting.
C. Consideration of items deleted from Steering Committee Consent Calendar, if
any.
From Supplemental Agenda:
d. Receive and file report from National Water Research Institute (NWRI) on
OCSD's Asset Management Strategic Plan
02/25/04
• Page 4
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMTS Consent Calendar
a. Order draft Operations, Maintenance and Technical Services Committee Minutes
for the meeting held on February 4, 2004 to be filed.
b. Ratify Change Order No. 1 to Treatment Plant No. 2 North and South Scrubber
Complex Caustic Tank Replacement, Specification No. S-2003-131, with
Jamison Engineering, authorizing an additional amount of $22,800, increasing
the total amount not to exceed $112,489.
C. Authorize the General Manager to award a sole source purchase order to
Schwing America, Inc., for overhauling three Schwing sludge pumps for an
amount not to exceed $129,460, for labor and materials.
d. (1) Approve a budget amendment of$150,000 for Phase III Biotrickling Filter
Demonstration Project, SP-90-7, for a total budget of $925,000, as an alternative
treatment to control odors; and,
(2) Approve Amendment No. 7 to the Study Agreement with the University of
California, Riverside to provide continued support for testing biotrickling filters as
an air emissions control technology for an additional amount of $150,000 for a
total amount not to exceed $355,000.
OMTS Non-Consent Calendar
e. Consideration of items deleted from OMTS Committee Consent Calendar, if any
13. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. Order draft Planning, Design and Construction Committee Minutes for the
meeting held on February 5, 2004 to be filed.
b. Ratify Change Order No. 5 for Area Classification Study Implementation Plan,
Plant Nos. 1 and 2, Job No. J-35-2, with J.F. Shea Construction, Inc., authorizing
t ^� an addition of$214,954, increasing the total contract amount to $14,946,310.
v) C. Ratify Change Order No. 12 to Primary Clarifiers 16-31 and Related Facilities,
Job No. P1-37, with Margate Construction, authorizing an addition of $22,390,
increasing the total contract amount to $71,241,204.
Approve Amendment No. 3 to the Professional Services Agreement with Ninyo &
Moore, to provide for Materials Testing, Inspection, and Geotechnical
Engineering Services, Specification No. PSA-2001-3313D, for FY2003/04 for an
additional amount not to exceed $75,000.
02/25/04
• Page 5
e. Approve Amendment No. 2 to the Professional Services Agreement with Smith
Emery GeoServices, to provide for additional Materials Testing, Inspection, and
Geotechnical Engineering Services, Specification No. PSA-2002-3313D, for
FY2003/04 for an additional amount not to exceed $75,000.
f. Approve Amendment No. 3 to the Professional Services Agreements with MDS
Consulting and Bush & Associates, to provide for additional Surveying Services,
Specification No. PSA-2001-34BD, for FY2003/04 for an additional amount not
to exceed $75,000 for each agreement ($150,000 total).
g. Ratify Change Order No. 4 to Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4,
with Steve P. Rados, Inc., authorizing an addition of$380,251, increasing the
total contract amount to$30,685,478.
h. Ratify Change Order No. 1 to Effluent Pump Station Annex, Job No. J-77, with
J.F. Shea Construction, Inc., authorizing a deduction of $1,967,158, decreasing
the total contract amount to $42,768,360.
i. Approve a reimbursement agreement with the City of Tustin to reimburse the
Orange County Sanitation District for the construction cost of two City water line
projects located in Prospect Avenue and Cameron Lane in connection with
Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk Improvements,
Contract No. 7-41, and City of Tustin Project Numbers 6106 and 6151, for an
amount of$665,211, plus administrative fees, in a form approved by General
Counsel.
j. (1) Approve Professional Services Agreement with MWH Americas, Inc. for
engineering services for Rehabilitation of Activated Sludge Plant at Plant No. 2,
Job No. 132-74, for an amount not to exceed $2,139,998; and,
(2) Authorize the General Manager to issue Task Authorizations not to exceed
$100,000.
k. Authorize the circulation of the revised Notice of Preparation for the
Rehabilitation of Ellis Avenue Pump Station, Job No. 1-10, for public review.
PDC Non-Consent Calendar
n I. (1) Approve Professional Services Agreement with Black & Veatch Corporation
Y to provide engineering services for Secondary Activated Sludge Facility 2 at
Plant No. 1, Job No. P1-102, for an amount not to exceed $17,896,463;
r (2) Authorize the General Manager to issue Task Authorizations not to exceed
D $200,000; and,
3 Authorize the General Manager to issue Task Authorizations between
( ) 9
$200,000 and $500,000 providing there is a time sensitive need and a PDC
meeting cannot be called within 72 hours.
M. Consideration of items deleted from PDC Committee Consent Calendar, if any
02/25/04
Page 6
14. FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. Order draft Finance, Administration and Human Resources Committee Minutes
for the meeting held on February 11, 2004 to be filed.
b. Receive and file Treasurer's Report for the month of January 2004.
C. Receive and file the Mid-Year Financial Report for the period ending
December 31, 2003.
d. Receive and file Quarterly Investment Management Program Report for the
period October 1, 2003 through December 31, 2003.
e. Receive and file the SWAP Report for the quarter ended December 31, 2003.
f. Adopt Resolution No. OCSD 04-05, Amending Resolution No. OCSD 98-33,
Amending Human Resources Policies and Procedures Manual.
g. Approve SAFETY-POL-115, Backflow Prevention Program, as provided for in
Resolution No. OCSD 02-5, regarding the District's Injury and Illness Prevention
Program Policy.
FAHR Non-Consent Calendar
The following item was considered by the FAHR Committee at the December 10, 2003
meeting, and recommended to go to the January 28, 2004 Board of Directors meeting
with a modified recommendation . The item was inadvertently not included on the
(� agenda for consideration:
h. Authorize the General Manager to solicit Requests for Proposals to conduct
G research services in connection with the Corporate Identity and Public
Awareness Project, Specification No. CS-2003-162BD, in an amount not to
exceed $50,000.
i. Consideration of items deleted from FAHR Consent Calendar, if any.
15. JOINT GROUNDWATER REPLENISHMENT SYSTEM COOPERATIVE COMMITTEE
(JCC)
� JCC Consent Calendar
a. Order Joint Groundwater Replenishment System Cooperative Committee
(� Minutes for the meeting held on January 12, 2004 to be filed.
b. Authorize changing the name of the "Joint Groundwater Replenishment System
Cooperative Committee"to the "GWR System Steering Committee."
JCC Non-Consent Calendar
C. Consideration of items deleted from JCC Consent Calendar, if any.
02/25/04
Page 7
NON-CONSENT CALENDAR
16. (1) Approve Plans and Specifications for Abandonment of Airbase Trunk Sewer -
California Street, Contract No. 6-13-3, on file at the office of the Board Secretary;
(2) Approve Addendum No. 1 to the plans and specifications;
(3) Receive and file bid tabulation and recommendation; and,
(4) Award a construction contract to Mike Prlich and Sons, Inc. for Abandonment of
t Airbase Trunk Sewer- California Street, Contract No. 6-13-3, for an amount not to
exceed $507,610.
17. Closed Session
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters, pursuant to Government Code Sections
54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection. At such time as the Board takes
final action on any of these subjects, the minutes will reflect all required disclosures
of information.
a. Convene in closed session, if necessary
1. Confer with Lisa Tomko, Human Resources Director, re Unrepresented
Groups Compensation and Benefits (Government Code Section
54957.6).
2. Confer with General Counsel re Woodside v. Orange County Sanitation_
District, et al., Orange County Superior Court Case No. 03CC17413
(Government Code Section 54956.9).
b. Reconvene in regular session
C. Consideration of action, if any, on matters considered in closed session
18. Matters which a Director may wish to place on a future agenda for action and
staff report.
19. Other business and communications or supplemental agenda items, if any
20. Future Meeting Date: The next Board of Directors regular meeting is scheduled for
March 24, 2004, at 7:00 p.m.
02/25/04
Page 8
21. Adjournments
............................................................................................................................................................................................................................................
:NOTICE TO DIRECTORS:To place items on the agenda for the Regular Meeting of the Board of
Directors, items shall be submitted to the Board Secretary no later than the close of business 14 days
:preceding the Board meeting. The Board Secretary shall include on the agenda all items submitted by
:Directors,the General Manager and General Counsel and all formal communications.
:General Manager Blake Anderson (714) 593-7110 banderscn@ocsd.com
:Board Secretary Penny Kyle (714) 593-7130 pkyle@ocsd.com
:Director/Engineering David Ludwin (714)593-7300 dludwin@ocsd.com
Director/Finance/Treasurer Gary Streed (714) 593-7550 astreed@ocsd.com
:Director/Human Resources Lisa Tomko (714) 593-7145 Itomko@ocsd.com
:Director/Information Technology Patrick Miles (714) 593-7280 pmiles@ocsd.com
:Director/Operations&
Maintenance Bob Ooten (714) 593-7020 rooten@ocsd.com
Directodfechnical Services Bob Ghirelli (714)593-7400 rhirelli@ocsd.com
:Communications Services Mgr. Carol Beekman (714)593-7120 cbeekman@ocsd.com
:General Counsel Thomas L.Woodruff (714)564-2605 tlw@wss-law.com
H:\dept\admin\BS\BOARD-SEC\022504 agenda w-comments for Chair.doc
ORANGE COUNTY SANITATION DISTRICT
90
February 18, 2004
Phone:
1714)962-2411
fax: To the Chair and Members
(714)962.0356
www.cead.com of the Board of Directors
mailing address: Subject: Board Letter
P.O. Box 8127
Fountain Valley.CA
92728-8127
street address: The following are items that you may find interesting. If you need additional
10844 Ellis Avenue information on any of the items, please call me.
Fountain Valley,CA
92708-7018
Sanitation District's Property Tax Revenue may be in Jeopardy
Member
Agencies I have just learned that the Legislative Analyst, Elizabeth Hill, suggests that$400
0 million of enterprise special district property tax be allocated to other purposes as
Cities determined by each County's board of supervisors. Look at the attached February 18
Anaheim letter from CASA's Executive Director, Mike Dillon, which provides additional
Brea information.
Buena Park
Cypress Fountain Valley y I have not et had time to analyze this news or evaluate the likelihood of the
Fullerton Legislative Analyst's recommendation being adopted in the FY 04-05 budget
Garden Grove deliberations.
Huntington Beach
Irvine
La Habra More later as news develops.
La Palma
Los Alamitos
Newport Beach WP rPrpivP, approximately $4n million in property tax. A loss of this magnitildP, would
Orange increase single-family user fees by approximately$40 per year.
Placentia
Santa Ana
- Seal Beach
Stanton Federal Funding Assistance for Full Secondary Treatment
Tustin
Villa Park
Yorba Linda Good news! We have been designated by Congress to receive a $1 million EPA
grant for secondary treatment within the FY 04-05 federal budget. Our game plan is
County of Orange to seek a total of $50 million over the next 10 years.
Sanitary Districts Earlier this month, Directors Silva and Ferryman were in DC to express our thanks
Costa Mesa and our intentions to the Orange County Congressional delegation. A memo from
Midway City our Washington consultant Eric Sapirstein is attached.
Water Districts
Director Ridgeway will visit DC in late February to express the same message. In
!ruins Ranch March, Directors McCracken and Cavecche will be in DC for the National League of
Cities Conference. We are making early plans for them to make the rounds as well.
We intend to maintain a consistent and frequent drum beat about the District's
financial needs and our interest in the federal government as a funding partner in our
move to full secondary treatment.
To maintain world-class leadership in wastewater and water resource management.
• WOJN` SAN,,,f/�
O
A =
90, Board of Directors
Page
February 18, 2004
Orange County Leadership Symposium
OCLS III is history and planning for OCLS IV is already underway. For the Board
Members who attended OCLS III, you know first hand about the possibilities for
improved leadership, coordination and relationship-building that the symposium
offers. For those who have not yet attended, let me suggest that you consider OCLS
IV—which will be held sometime in January 2005.
1 have included the hard-copy of Dr. Eric Allenbaugh's Power Point presentations
used this year.
A questionnaire has been sent to all OCLS III attendees. If you have not yet
completed it, I urge you to do so. Your input will be vital to improving the symposium.
OCCOG Growth Visioning Workshop
There is a March 3, 2004 workshop scheduled at the Tustin Community Center. Six
million people will be added to Southern California by 2030. Schools, transportation,
water supply, wastewater systems, stormwater—all public institutions and
infrastructure will be challenged by these new people. And over 70% of them will be
the children and grandchildren born right here. They WILL come.
This workshop is intended to begin the dialogue in which all elected and appointed
officials have reason to join. The invitation letter and RSVP form are included.
Secondary Treatment Standards Update
All operationally available secondary treatment facilities are online. Staff continues to
make in-plant adjustments and improvements to existing processes to advance
toward secondary treatment standards. The final effluent is a blend of 68%
secondary treatment and 320/o primary treatment, which is above our target of 64%
secondary treatment. During the 12 months prior to the Board's decision of July 17,
2002, the District's final effluent quality averaged 51 ppm TSS and 72 ppm BOD.
During January 2004, the final effluent averaged 36 ppm TSS and 60 ppm BOD
versus the secondary treatment goal is 30/30 ppm TSS and BOD.
Articles of Interest
I have also included several additional published articles that you might find
interesting.
• 4oJat. SANIIAfa�
W � O
J 2
I
Board of Directors
'A P Page 3
February 18, 2004
If you would like additional information on any of the above items, please call me.
Blake P. Anderson
General Manager
BPA:jt
H:\DEPT\ADMIN\GM\LETTERS TO THE BOARD\04\022504 BOARD LTR.DOC
Attachments
d SAKFA r -- H
925 L Street,Suite 1400 Sacramento,CA 95814 PH:(916)446-0388—FX:(916)4484808 www.casawcb.org
February 18, 2004
TO: CASA Member Agencies
CASA Associates
CASA Attorneys
CASA Executive Board
FROM: Mike Dillon, Executive Director/Lobbyist
Christina Dillon, Lobbyist
RE: LEGISLATIVE ANALYST PROPOSES REVISION TO PROPERTY TAX
ALLOCATIONS
I. LAO ANALYSIS OF THE 2004-05 BUDGET BILL
This morning, the Legislative Analyst, Elizabeth Hill, released the analysis of the Governor's
2004-05 Budget Bill. The 2-1/2-inch thick document, together with a second document, titled
"Perspectives and Issues,"are developed annually to assist the Legislature in setting its
priorities in the Budget Bill and in other legislation. The Analyst notes that a key element of
the Governor's Plan is the assurned approval of a $15 billion economic recovery bond un the
March Ballot, to pay off the accumulated 2002-03 budget deficit and help address the
remaining shortfall. However, the Analyst states that"while the Governor's proposal is a solid
starting point for budgetary negotiations, a considerable amount of work remains to fully
resolve the State's chronic budget-related problems." The Analyst goes on to comment that
'.we further project that an ongoing General Fund structural deficit of close to $7 billion would
exist beyond the budget year, absent corrective action."She also notes that the Budget
continues to rely on several revenue assumptions that may not materialize, such as $500
million from tribal gaming and $350 million from the federal government, etc. Beginning in
early March,the various budget subcommittees, in both the Senate and the Assembly, will
begin discussing the Governor's Budget in detail, at which time representatives of the
Legislative Analyst's Office, serving as advisors to the Legislature, will either recommend
agreement or alternatives to the multiple provisions in the Governor's Budget.
II. ANALYST PROPOSES MAJOR PROPERTY TAX REALLOCATION
As reported to you at the January CASA Conference, the Govemor's Budget proposes to
shift$1.3 billion of property tax from local governments to K-14 districts, thereby freeing up a
like amount that the State could use to help balance the Budget. The Analyst recommends
the Legislature reject the Governor's proposal and instead suggests"the Legislature should
1
r
use its authority over this tax for the overall betterment of local government, not as a state
rainy day fund." The Governor's $1,336 billion property tax shift includes a$909 million
reduction to counties, $188 million for cities, $135 million for redevelopment agencies, and
$105 million for special districts. The Analyst instead recommends a $216 million reduction
in local subventions (Citizens Option for Public Safety[COPS] -$100 million; Juvenile Justice
Challenge Grants-$100 million; Public Library Funding-$16 million), $400 million locally
determined special district property tax shift, $320 million redevelopment property tax shift,
$400 million reduction in city and county sales taxes ($200 million each), and a reallocation of
vehicle license fees.
The Analyst's basis for this alternative proposal is that the State Constitution establishes the
property tax as a local tax and should not be used as a"State resource." The Analyst
outlines a proposal that she feels would minimize reductions to local government general
purpose revenues, allow more local control, and take into consideration the effects on land
use incentives. The following are some of the Analyst's comments with respect to the impact
of previous reductions and the new proposed property tax reductions to local governments:
• City and County Program Reductions: "Most city and county programs currently
financed with property taxes are not amenable to user fee financing. Additionally,
the Constitution requires voter or property owner approval before a local agency
may impose or increase a local tax or assessment. Thus, reductions in city and
county property taxes likely will trigger program reductions, including parks,
recreation, libraries, public safety and, in some counties, local health programs."
• Nonenterprise Special Districts: "The impact on nonenterprise special districts is
not clear, as some have the ability to rely on other revenue sources, such as fees,
assessments, and payments from other governments to finance their operations.
However, many depend on property taxes for most of their budgets, and the
Governor's shift could result in significant cuts to flood control, library, and park and
• Enterprise Special Districts: "Most of the State's approximately 1,700 enterprise
special districts provide water or waste disposal services and have considerable
authority to levy user fees to pay for services. More than half of these districts do
not receive property tax revenue and those that do, rely on property taxes for only
7% of their revenues. Given the significant fee authority of enterprise special
districts and the nature of the services they provide, we assume that increased
user fees, which do not require voter approval, would offset a significant portion of
the property tax shift."
• Redevelopment Agencies: "Redevelopment agencies may offset tax losses
through project expansions.
III. SPECIFIC RECOMMENDATION FOR ENTERPRISE SPECIAL DISTRICTS
The Analyst proposes a $400 million special district property tax shift,which "is equivalent to
almost an 80% reduction to enterprise special district 2004-05 property taxes, or about a 15%
reduction to all special district property taxes." The allocation of this property tax shift would
be locally determined. Specifically, "the Legislature would establish a special district property
tax amount for each county. Every county board of supervisors, after public hearing and
debate,would revise the share of property taxes received by special districts in their county
to implement the shift and reallocate property tax resources in a manner that best meets the
2
needs of their county residents." The Analyst acknowledges that"such an approach would
engender both concerns by special districts and significant public debate."
The Analyst's rationale for the above is noted as: "The 1990s shifts did not allow communities
to reconsider the shares of property taxes allocated to enterprise special districts. Because
enterprise districts can finance most of their activities through user fees, local communities
might have preferred to reduce or eliminate enterprise special district property taxes in order
to preserve property tax resources for other local agencies. (Government Code, Section
16270, dating from 1978, declares the Legislature's intent that these districts transition to
user fee financing.)" Note: Section 16270 states, "It is the intent of the Legislature that such
districts rely on user fees and charges for raising revenue due to the lack of availability of
property tax revenues after the 1978-79 fiscal year. Such districts are encouraged to begin
the transition to user fees and charges during the 1978-79 fiscal year.
IV. OTHER LOCAL GOVERNMENT IMPACTS
In recommending against the$1.3 billion property tax shift, and to make up those revenues
locally, the Analyst also proposes to shift$320 million from redevelopment agencies, which
would represent approximately 11% of redevelopment 2004-05 property taxes. The Analyst
would also replace the Administration's single-percentage redevelopment property tax shift
with a sliding scale approach that"decreases on an ongoing basis—city and county
incentives to inappropriately expand redevelopment activities." Lastly, as mentioned earlier,
cities and counties would each give up $200 million in sales taxes, which the Analyst, in
responding to a reporter's question at her press conference this morning, stated, "would
reduce some of the fiscalization of land use."
V. MORE LATER
As more information is provided on the LAO recommendations, we will forward it to you. In
the meantime, it is important to recognize that the Analyst's recommendations will be subject
to extensive review in the budget process and will require legislation, in most cases, to be
enacted.
3
MEMORANDUM
TO. Robert Ghirelli
FROM: Eric Sapirstein
CC: John Freshman
DATE: February 18,2004
SUBJECT: Washington Visit
On February 3-5, 2004,Members of the Board of Directors James Silva and Jim Ferryman
and you met the Orange County Congressional Delegation,House and Senate Committee on
Appropriations staff,and U.S.EPA Office of Water officials. The purpose of the meetings
was to express appreciation for the support of the secondary treatment upgrade initiative and
to request funding support in fiscal year 2005.Because of the closure of the Senate office
buildings attributable to the discovery of the poison Ricin, meetings with Senators Feinstein
and Boxer's offices were cancelled. The following summarizes the meetings. By earlier
email, a draft letter of thanks and the mailing addresses was provided for follow-up. Because
of the recent problems associated with the Ricin episode,mail delivery has been halted for the
'U.S.Senate.Therefore,it is important that the final letters be faxed or mailed to us. We Neill
then ensure that they are delivered on behalf of the District.
Summary: Meetings Display Continuing Support for OCSD Funding Assistance
In general,OCSD's request for continued support from the delegation was well received and
endorsed as an appropriate request for fiscal year 2005. Directors Silva and Ferryman
expressed the Board's deep appreciation for the support the delegation had provided in the
past year,noting that their commitment resulted in a$1 million appropriation to begin the
OCSD partnership with the federal government. In each meeting,the Members exhibited a
sound understanding of the issue and the importance of providing Orange County and OCSD
with federal assistance similar to that provided to other coastal communities. In a discussion
on the benefits of the program,Director Ferryman noted the value of the project to the
•Page 1
CADocurnents and SetdngsNtappanlocal SettingsWernporary Internet Fle9�01.K541triprpt204.doc
Groundwater Replenishment Project. He informed the delegation that the ability to ensure full
secondary treatment compliance will guarantee a secure and reliable source of water for reuse
project,thereby protecting the region from shortages and salt water intrusion into the aquifer.
Director Silva noted that the issue of equity was a major point of concern in making the
request. It was noted that the County was a donor county and that States like New Jersey
receive more funding assistance for their coastal needs than the entire West Coast. He
highlighted the fact that the County's coastal waters and beaches are a major destination point
for recreational purposes. As such,the secondary treatment upgrade represented an effort to
protect this natural resource and maintain the economic activity generated by the recreational
activities. The Members noted that this was an important fact to keep in mind. They agreed
that Orange County was contributing more than its fair share to the federal government when
comparing the amount of program assistance that is returned to the County. In closing the
meetings,each Member voiced support for OCSD and its effort to maintain the federal
partnership and increase funding assistance as the project is implemented.
In separate meetings with senior staff to the House and Senate Committees on Appropriations,
a review of the fiscal year 2005 budget process occurred. The staff informed OCSD that the
project request seemed justified given the importance of ensuring secondary treatment
compliance and the fact that in prior years Congress had provided substantial federal support
to other coastal communities. This year,however,the prospect of timely completion of
agency budgets is unlikely. Nonetheless, the staff emphasized the importance of pursuing the
funding request to ensure that when the appropriations process does begin to move,the project
request remains a visible and high priority issue. The staff also noted that while the
President's budget request seeks to sharply reduce clean water grants assistance,Congress has
resisted such efforts and is likely to follow this approach in fiscal year 2005.
A meeting with U.S.EPA's Office of Water,Municipal Assistance Office was convened to
identify the process by which the$1 million in initial grants assistance would become
available to OCSD. EPA staff informed OCSD that the Office of Water was finalizing
guidance detailing how communities should apply for the grant funding. Central to this
process is compliance with NEPA and other regulatory issues. EPA hopes to have the
guidance available by April and make funding available by July. OCSD was provided the
names of officials in Region IX to contact regarding the release of the funding.
Action Items
As a result of the meetings,a number of action items deserve your consideration. These are:
• Draft and email letters of thanks from Directors Silva and Ferryman to meeting
attendees(draft and addresses provided under separate emails)
• Arrange for meeting with Representative Sanchez in District Office to present request
for continued support
• Survey congressional staff for interest in tour of OCSD later this year to view progress
in project design and construction
0 Page 2
5P&kb L-Icr,-lr- tz
ORANGE COUN-rY LI: AI)I IZSI-IIP SYMPOSIUM
-t-t-�� oC L S OF_XSc
64 4t
February 2, 2004 ATI-ikC(.At'*S ---
The OCLS Advisory Team
Blake Anderson W LTA "C�fi EUM—
BLAKE ANDERSON OCSD
Genera!Manager 10844 Ellis Ave.
Fog-
ORANGE COUNTY SANITATION
DISTRICT Fountain Valley,CA 92728
JANET M. HUSTON Dear Blake:
Executive Director
LEAGUE OF CALIFORNIA The Orange County Leadership Symposium Steering Committee thanks you for participating
AN CITIES,CRGE COUNTY
DIVISICti in OCLS III. We recognize that your attendance is very representative of your personal
commitment to the future of Orange County.
WALLY KREUTZEN
Chief Executive Officer We want to especially thank those of you who participated in focus groups with Dr. Eric
TRANSPORTATION CORRIDOR Allenbaugh last fall. Your participation in these focus groups was crucial in ensuring that
AGENCIES
the symposium continues to meet the needs of participants. The result was two days of
ART LEAHY engaged dialogue on leadership and what it means to be a leader in Orange County.
ORANGE COUNTY Planning has already begun for OCLS IV. The first step is to obtain your honest feedback on
TRANSPORTATION AUTHOP,T.TY OCLS III. Enclosed you will find an evaluation form. We request that you fill it out
quickly,while the weekend is still fresh in your mind,and send it back in the enclosed
TIM Q'DONr of 5 envelope by February 16th.
MANAGERS'ACCOCiATION Also enclosed is a roster of participants,select hand-outs from Dr. Allenbaugh's PowerPoint
presentations during the symposium and notes from the nine groups who participated in
CHIP PRATHER Sunday morning's exercise to define the meaning of quality of life in Orange County.
AUTHORITY Again, thank you for committing to the journey. Watch for information about a one-day
seminar with Dr. Allenbaugh in Orange County in April and we look forward to working
Vacant together to find The"Third Great Idea"--whatever it may be.
COUNTY OF ORANGE
Sincerely,
DANA M. SMITH
Executive Cficer
LOCAL AGENCY FORMAT ION
COM^^ISSION Blake Anderson Janet M.Huston
OC Sanitation District OC Division,LOCC
Gc� n n n
Wally Kreutzen Arthur Lea.
Y
Transportation Corridor Agencies OCTA
Tim O'Donnell Chip Prather
OC City Managers' Association OC Fire Authority
Qom"".al_ _V
Dana M. Smith
LAFCO
ORANGE COUNTY
LEADERSHIP
SYMPOSIUM
January 2004
Eric Allenbaugh, Ph.D.
m 2GO4
The answers are within!
The 4 Corporate Cultures
BEING THRIVING
)cwm>ycwe) (Mastery)
HUMAN
ELEMENT
EFFEC7IVENESS
SURVIVING DOING
(W.hm9 is—t SI w)
WouneW)
^t 2 I 4 s
BOTTOM LINE EFFECTIVENESS
P-d=UNty OuaUty
T.cnnldl Fl—cial
1
D►etm
Delrilar If WUT Deride
Y8U SEEKt
Da�letee `�
°Em ulebupn.rwD.
THE CORPORATE NAVIGATOR
MISSION: What is oDpurpose?VISION: Where are CULTURE: What d
PARTNERSHIP
COMMITMENT
I
COMPLIANCE
I
COMPLIA CENCY
PASSIVE RESISTANCE
1
ACTIVE RESISTANCE
INDIVIDUAL ORGANIZATIONAL
VISION&VALUES VISION&VALUES
2
PRIORITY MATRIX*
URGENT NOT
URGENT
IMPORTANT 1 2
NOT 3�� 4
IMPORTANT
'Reference:Roger Merrill
ENGAGEMENT AT WORK
Now does your organization
compare to national averages?
• 29%are engaged
• 54%are not engaged
• 17%am actively disengaged
4ru•w Wu a Yf w.•Min.w
THE 3 CATEGORIES OF ASSOCIATES:
QQ The"Bright"Eye Group
V
pp The"Glazed"Eye Group
OThe"Beady"Eye Group
3
DIFFERENCES ARE RESOURCESI
0
0
z
W
Culture 2 Mission
Ir
Values, W O Vision
Standards 0: a Strategies
W
3 LEADERSHIP STYLES
1. Eagles
2. Ducks
3. Seagulls
How does each style impact performance?
PRINCIPLED DECISION MAKING
Putting our"Content' into "Context"
PRINCIPLES:The'Guiding"Factors
• M]SSION:Wlul a eur pu�po.et
• VISION:Who-am wapomp?
pi CULTURE:What do—rat-?
X
X
H PROCESS:The'Being'Factors
Z Ne.w•nnewn n,1•am
p New rn cemmun e.p
V pa New...eppen enaLroy
• NOw M haneM ceneM
• H"rn aolr.pr.W.nu
PRIORITIES:The"Doing'Factors
CONTENT P3 .1t�itpt.�m.nbnq;.ct—P1..
•Erafuwnp"auf4
4
STRATEGIC DIRECTION
CORE STRATEGY H
Mjo
3130
GY J2
CURRENTY/3
STATUSp ❑ ❑ VISION
GY+M
GYlS
❑ ❑ ❑ ❑ ❑ ❑
Jd(357 Noftgam aM o mmdo H@A
RE$PQND:
•Accountable GROW
•Conscious
� —1 Siruation 4�U:S:E!)
R'hcrc 1 am now! Choice
Z'I Poin:
I: STCCKSIAILCICLL
REPEAT: I I REACT:
•C1�liat�or ��-�- •A�armati.-
•History Unconscious
THE DECISION DIAMOND
To what extent is this CUSTOMERS
action or decision:
1. Consistent with our N
mission? w MISSION W
2. Bringing us closer to > uj
_
O VISION
our vision? ii VALUES 3
3. Honoring our values? U.1
O
4. Serving our key
stakeholders?
EXTERNAL
STAKEHOLDERS
5
COMMUNICATING TO CONNECT:
Caring Straight Talk Strategies
I
C�c�G�(lc��L�ia�Gan pu'�Do
STRAIGHT
TALK: THINKING
A caring approach
to understanding
through matching INNER
our outer expression XPERIENC
with our inner experience.
FEELING WANTING
CARING STRAIGHT TALK
Tough on issues
Tender on people!
6
2 ESSENTIAL
COMMUNICATION ELEMENTS
' °k Tod h MR6@7&,,@ ID
r
St.Francis of Assisi
SAFETY: Seeking their truth
1. Pause!
2. Say: "Tell me more!"
3. Listen with every bone in your body.
4. Find a way to understand:
-their facts,
-their feelings, and
-their perceptions.
5. Reward the feedback!
7
THE 3 TRUTHS
r11--j, -"-H
Flo ft Nmn''ar
o 7111de two
COURAGE: Speak Your Truth!
✓GIVE FEEDBACK VSELF DISCLOSE:
• Acknowledge their I am thinking...
"Strengths" I am wanting...
• Confront their I am feeling..
"Stretches"
—Do more of...
—Do less of...
8
MATCH
RAPPORT
PACE
INFLUENCE
THE "BIG-LITTLE-BIG" TECHNIQUE
Actively Engaging Participants
Introduce the issue to ihe'Big"group.
Engage participants in'l-dtle'group
discussions regarding the issue.
While still in the small oroups.have each
group provide feedback and observations to
the"Big'group.
ENGAGE IN CREATIVE THINKING
1. Withhold critical thinking until the creative
process is complete.
2. Look for the"3rd Great Idea."
3. Ask"what if questions.
4. Conduct a"0 to 10 Survey"
•ASSESSMENT:On a scale of 0 to 10,how would
you assess the quality of this idea?
• STRETCHES:What would make it a•10"for you?
• STRENGTHS: What advantages to you see with
this approach?
9
S
WIN-WIN
CONFLICT
STRATEGIES
Eric Allenbaugh, Ph.D.
Meet my interests
_ COMPETING COLLABORATING
V
W
COMPROMISING
z
W
Q
M
d AVIXDING ACCOMMODATING
H9N Meet their interests
lOM
COOPERATIVENESS SCALE
Creating Win-Win Results
� c' o
1. What are my interests? AUSE
2. What are their interests?
3. What is the worst that could happen
if I were to address this issue?
4. What is the best that could happen if
I were to address this issue?
5. What if I didn't address this issue?
10
e
The 10 Win-Win Strategies
1. Commit to win-win 6. Be tough on issues&
2. Focus on interests, tender on people
not positions 7. Look for the 3rd great
3. Assume a positive solution
intent 8. Let go of old baggage
4. Seek first to 9. Shovel while the piles
understand,then to be are small
understood 10. Be trusting and
5. Look for the 3 truths: trustworthy
Yours,theirs,and the
truth
LOOPS HAPPEN!
ESIRED
�4s STATE
O
�� C PAUSE!Y ~
CU( RRENT-
1 STATE j
11
0
`rf'I �tY!
'r74 c;;,a tge county cot inci! of governments
February 13, 2004
cities
Dear Orange County Stakeholder: Alisoviejo.
Anaheim
Brea
On behalf of the Orange Count Council of Governments OCCOG), I invite you to Buena Park
g Y ( Costa Mesa
attend our upcoming Growth Visioning Workshop. This event is scheduled to take place Cypress
Dana Point
March 3, 2004, from 10:30 a.m. to 3:00 p.m. at the Tustin Community Center, located at Fountain Valley
Fullerton
300 Centennial Way, Tustin, California. This workshop represents the fourth phase of Garden Grove
OCCOG's Growth Visioning Program. Huntington Beath
Irvine
La Habra
La Palma
As Orange County's population continues to grow, decision-makers will have to evaluate Laguna Beach
alternatives, such as infill develo ment or mixed-use develo ment to accommodate the Laguna Hills
P P Laguna Niguel
growing need for housing and the strains that traditional forms of development have Laguna Woods
Lake Forest
placed on our transportation systems. OCCOG's Growth Visioning Workshop is a Los Alamitos
chance for Orange Count decision-makers to learn and participate in a program designed MissionVielo
Y P P P g Newport Beach
to empower them to meet the new challenges in their communities. Orange
Placentia
Rancho Santa
Margarita
The attached brochure and RSVP form provide further information on the workshop and San Clemente
how to take art in this exciting event. If you have an questions regarding the Growth San Juan
P" t5 Y Y 9 g' Capistrano
Visionin; Workshop, please contact Heather Dion. OCCOG's Regional Issues Analyst or Santa Ana
Seal Beach
Annabel Cook, OCCOG's Regional Issues Consultant at (714) 972-0077. Stanton
Tustin
Villa Park
Thank you for our continued support of OCCOG. Together, we can plan for the future Westminster
Y Y PP g P Yorba Linda
and act collectively on important subregional and regional issues. I hope to see you all at
the workshop. County of Orange
agencies
Costa Mesa Sanitary District
Sincerely, East Orange Water District
El Toro Water District
Irvine Ranch Water District
OC Sanitation District
OC Transportation Authority
f OC Water District
l
Transportation Corridor
Lou Bone Agencies
Chair, Board of Directors
Mayor Pro Tem, City of Tustin
Enclosures
'tvi '3ant.--ArtG 12'1 u.Ji 1=E 214, j2.-u Ana,C..ahlro n;a 7?27 Q t i 1 A,97--007 '71'tr1972-18:0 fax
��LCwGr�ItI�:;.Dia '.+..,.'.vCC_tSS. �dIOCCi�
ORANGE COUNTY COUNCIL OF GOVERNMENTS
GROWTH-VISIONING WORKSHOP
c.I3, 004
\ O .ni�
)4r t
.. ><-- ..� � ; ♦�' r � .f Cam± ,� � �pl ►T{r, ',.i t. t �'y.. i
3 �tehtennial Ali u tin
, •�
Improving Our Neighborhoods,
Increasing Our Sense of Place
What are the benefits of attending?
You'll have a much better grasp of the opportunities mixed-use and infill
development present, a better understanding of alternative development
choices, and ways to work with neighborhoods to gain support for these
types of projects.
❑ YES! I would like to RSVP for the FREE Growth Visioning Workshop.
Attendee RSVP
Name:
Title:
City/Agency:
Phone: Fax: E-mail:
Please RSVP by February 27, 2004.
Lunch will be provided.
Fax or mail this form to:
Orange County Council of Governments
600 West Santa Ana Blvd., Suite 214
Santa Ana, CA 92701
Phone (714) 972-0077
Fax (714) 972-1816
SO LI MAR ;
M A I N S T R E E T RESEARCH GROUP INC. i
ARCHITECT$ PLAT\jNERS INC.
p
O V
a
� V
Q V
n. O You'll learn:
Conference facilitators.9
a
Speakers: 1041
• How CMOM requirements
Speakers.
T can affect your agency
Conference Facilitators: N ? ( • CMOM implementation
James W. Graydon, P.E. c strategies
Vice President Kennedy/Jenks Consultants " • Funding strategies
Ln • Spill prevention and
Dr. Nicholas (Nick) Pinhey, response planning
CWEA Training Coordination Committee
• Practical applications
Chair
TI Conference Speakers & Case Studies = 0 0 � r
Panel•
.4�, Z
Nick Arhontes, Orange County SD — D n rn
rn * +=
r-, Cl
Sara Demio, San Mateo - r' o T
r--t C ' T
v` (nz C ,
Eileen, Fanelli, EMBUD—Upcountry = �— 7, < --A
1�1 In
Mike Fisher, Kennedy/Jenks Consultants = ' w
:D H G
Jeff Harsha, Yosemite National Park =
— r9 n n
Pat Hassey, SRCSD
0o Z UJ ( <
— I N
Allan Highstreet, CH2M Hill - C7 rn
Mario Osorio, Kennedy/Jenks Consultants = "0
H
r�
Rolf Olemutz, Vallejo Sanitation & Flood
Control District
March 9, 2004
RWQCB Staff from Region 5 & 8 o Elsinore, CA --1
� vv
Ken Payne, City of Folsom -D O March 11, 2004
O D C p Folsom, CA
Zoeanne Tafolla, Vallejo Sanitation and 3 7C (n =': 4 ,
Flood Control District D D + Brought to you by CWEA,
Z its Santa Ana River Basin
Warren Tellefson, Placer County Q Q Section and the
OC)
N• Sacramento Area Section.
Tim Williams, Kennedy/Jenks Consultants W D �y
0
Practical & Proactive SSO Prevention
Practical and Proactive SSO Prevention Fist Name -Last Name-- - Name for Badge -
Agency/Company
The California Water Environment Associa- helping your agency comply with the address --------�------
tion, Sacramento Area Section and Santa SSO/CMOM regulations. You will learn about
Ana River Basin Section are spon- the current regulatory perspective on City -_---� State -- Zip Code
soring two one-day specialty SS0/CMOM and you'll be given real
seminars entitled Practical and world examples of how agencies are Email Address---- -----'--
Proactive SSO Prevention. L positioning themselves through agency
Phone Fax Number
case studies. _
Municipalities and sanitary dis- Member CWEA,WEF or CA-NV AWWA Mbr#
tricts are proactively anticipating
< < This seminar is intended for manage-
Current membership required for member rates.
the enforcement of the EPA's pro- nlent and staff who are responsible for Member Non-Member
posed Sanitary Sewer Over- ` ` ` the development and implementation of ❑ So.California— March,9.2004 $135.00 S184.00
Elsinore Session
flow/Capacity, Management, Operation SSO prevention programs. El No.California—March 11,2004$135.00 S184.00
and Maintenance (SSO%CMOM) regula- Folsom Session
tions. These seminars are designed to pro- Method of Payment
vide you with some strategies and tools for Check
,�
E -- - -... ------- _— .__._. ____�__ -.��. _ - -'_s.-�•:�-r Discover
Conference Schedule: Conference Locations: ❑ visa
8:30- 9:00 AM Registration ❑ MasterCard
9:00- 9:10 AM Welcome Southern(olifoinia—Elsinore, CA —March 9,2004 ❑ American Express
9:10 AM- 9:40 AM (MOM and Your Next Permit Elsinore Valley Municipal Water District Purchase Order—Must be attached
9:40 AM - 10:1 OAM The Business(use for(MOM 31315 Chaney Street, lake Elsinore, CA
10:10— 10:30 AM BREAK From the 1-15 freeway: dredit card ---- -Exp.date—
10:30 AM - 1 I:1S AM Tools for Smaller Communities Exit at Central Ave(Ortega Hwy 74);
11:15 AM- 11:45AM Spill Prevention & Response signature - --
Turr1 West on Central Ave.;
Planning left on Collier Ave. If more than one person from your agency,please photocopy
11:45 AM - 1:00 PM Lunch & Proposed US EPA Wet and submit one form for each person.
Right on Chaney Street Written cancellation notice is required,and must be received of least 15 days prior
r or to
Weather Blending the conference date. A 25%service fee shall be retained on all cancellations. No
1:00- 1:30 PM Prioritization Strategies for (MOM refunds shot)be given for cancellations made less than 15 days prior to any conference.
Northern California—Folsom, CA —March 11,2004 All fees for conference registration shall be paid in full of the time of pre-registration or
Implementation on-site registration. Full payment may be made b credit card,personal check or
p Folsom Community Center, company/agency check.pPurchase orders are acceptable and mst be onached to the
1:30 2:00 PM Funding Strategies 52 Natomo Street, Folsom CA registration form. Registrations received by CWEA without full payment or purchase
2:00 2:20 PM BREAK order will not be processed.
CREDIT CARD PAYMENTS MAY BE MAILED TO THE ADDRESS BELOW
2:20 4:30 PM lessons learned: Case Studies From Sacramento: OR FAXED To(51o)387-7810
CWEA Specialty Conferences
4:30 PM WrapUp& Adjourn Take Hwy 50 east toward South Lake Tahoe. Take the Folsom �c7;oakpart street, 21 s25
1 1 Y Oakland,CA 94621
Blvd.Exit and turn left onto Folsom Blvd. Go 2.7 miles to Phone: 510-382-7800
CWEA is working with SWRCB to determine if California Nrltoma Street and turn right onto Natoma Street. Go 1.1 Fax:510-382-7810
State CEU's will be available. Contact Hours w Questions? Call 510.382.7800.ill he given. miles to the Community Center on the left. Register online at www.cwea.ar g.
Check the CWEA wehsite for updates.
FieO goad
1t5S�c cd-7&e v etc
Good government demands the intelligent interest of every citizen.
(Inscription above the main door of the San Diego County Administration Center)
You can't mandate good intentions.
(J.Fred Silva,former Senate Local Government Committee consultant)
The controversies facing the Sacramento Suburban Water District prompted legis-
lators to ask questions about special districts' governance. Who really runs Cali-
fornia's 3,300 special districts? Who supervises how they raise revenue and spend
those public dollars? Who is responsible for protecting the public interest?
These questions of governance, political accountability, and procedural transpar-
ency are universal and timely. People ask these questions in California,just as
they ask them Baghdad, Jerusalem, and Kabul. These questions came up again
when the Sacramento Bee focused on the problems facing the Sacramento Subur-
ban Water District.
Senator Deborah Ortiz raised these policy issues in May 2003 when she amended
Senate Bill 456 to limit the compensation that the Sacramento Suburban Water
District can pay to the members of its board of directors. Rather than move SB
456 without a full examination of the larger issues, Senator Ortiz asked Senator
Tom Torlakson to convene an interim hearing of the Senate Local Government
Committee. An interim hearing is a special meeting that a legislative body holds
during the Legislature's interim recess. Legislative committees cannot act on bills
at hearings that are held outside the Capitol. However, during interim recesses,
committees can hold topical hearings that prepare legislators to act on future bills.
About This Paver
This background paper prepares legislators and other interested persons for the
November 24 interim hearing by reviewing the organization of special districts,
their governance, ethical behavior, financial reporting, and oversight efforts.
Throughout the paper there are questions which legislators may ask the witnesses
at the November 24 hearing. The suggested questions appear in italics, preceded
by the *- symbol.
2
What's So Special About Special Districts?
Celebrated by some as the best example of local democracy, cursed by others as
the worst form of fragmented government, and generally misunderstood even by
the experts, special districts are California's unique contribution to local govern-
ment.
What's so special about special districts? The best answer is focused service. Fo-
cused because special districts serve only specifically defined areas, unlike cities
and county governments that must provide services throughout their entire jurisdic-
tions. Special districts are also focused because 85% of them deliver only a single
service. In contrast, county governments provide over 40 programs and most cities
offer about a dozen services. Service because special districts deliver only those
public services and facilities that local residents and property owners want. Dis-
tricts provide the programs that have local support; counties must offer state-
mandated local programs.
A special district is a separate local government that delivers public services to a
defined territory. This definition relies on four distinguishing characteristics:
• A form of local government.
• Governed by a legally constituted board.
• Provides public services and public facilities.
• Within defined boundaries.
Powers. Like cities and county governments, special districts have corpo-
rate powers (the authority to Provide services and facilities) and tax powers (the
power to raise money to pay for services and facilities). However, special districts
rarely have police powers (the authority to regulate private behavior to accomplish
a public goal). For example, a recreation and park district can own and operate
public parks,just like a city or a county but it lacks the power that cities and coun-
ties have to regulate land use.
Numbers. As the table on page 3 shows, there were 3,298 special districts
in 1999-00. Because special districts are the most common form of California lo-
cal government, there is a lingering perception that their numbers are increasing.
The reality is that the number of special districts has declined since 1977-78, the
year in which the voters passed Proposition 13. In contrast, the number of cities
increased by 55. (Currently there are 478 cities.)
3
Special Districts,by Oye, 1999-00
County Service Area 873
Fire Protection 385
Community Services 314
Cemetery 253
County Water 171
Reclamation 151
California Water 141
Recreation and Park 110
Resource Conservation 99
County Sanitation 81
Irrigation 96
Hospital 79
--�-Sanitary 75
Public Utility 54
Mosquito Abatement 46
Storm Water Drainage and Conservation 49
County Waterworks 34
Municipal Water 40
Flood Control and Water Conservation 39
Water Agency or Authority 30
Memorial 27
Drainage 22
Levee 15
Harbor and Port 13
Library 13
Transit 13
Water Conservation 13
Airport 9
Water Storage 8
Citrus Pest Control 8
Garbage Disposal 7
Pest Control 6
Municipal Improvement 5
Municipal Utility 5
Police Protection 3
Sanitation and Flood Control 2
Sewer 2
Water Replenishment 2
Bridge and Highway 1
Joint Highway 1
Metropolitan Water 1
Separation of Grade 1
Toll Tunnel Authority 1
TOTAL 3,298
Source:State Controller's Office,Appendix B, Special Districts Annual Report, Fiscal Year 1999-00.
4
How Many Local Governments`'
Type 1977-78 1999-00 Change
Counties 58 58 0
Cities 419 474 +55
Special districts 3,454 3,298 -156
These numbers differ from the total numbers in the State Controller's annual re-
ports. Required by statute to use a broader definition, the State Controller must
count agencies that are not really special districts such as air pollution control dis-
tricts,joint powers agencies, and even nonprofit corporations (Government Code
§12463.1).
Does California have too many local governments? The 1998 study by Paul Lewis
thoughtfully reviewed previous research and examined different data sources.
While Lewis conceded the complexities of California's local governments, he
found that "it is not abnormally fragmented, by U.S. standards, nor is it highly un-
stable." A county's population size and its historical pattern of population growth
influence the degree of governmental fragmentation, Lewis said, because "simply
put, bigger and older areas tend to be more fragmented."
Governance
The structure and processes of any organization influence how it performs. How a
government agency is structured and the processes that it follows in making deci-
sions influences which facilities and services it provides. The study of public ad-
ministration teaches that changing a government's structure and processes changes
the likelihood of the agency's results.
For example, if legislators want to open up a cemetery district's governing board to
a wider range of viewpoints, they could amend the state statutes to increase the
number of trustees from 3 to 11. Having a larger board of trustees would not guar-
antee more public participation but it increases the possibility that more viewpoints
could be represented. Similarly, changing the election of large sewer district's
board members from at-large to by-districts could boost the influence of neighbor-
hood interests.
Changing processes can also change outcomes. Requiring more public reports,
more public notice, and more public hearings could slow down the pace of a dis-
5
trict's decisions. Because legislators control special districts' structures and proc-
esses, state statutes influence what the districts do and how they do it.
Independent vs. dependent. About 2/3 of California's special districts are
independent special districts with governing boards that are directly elected by lo-
cal voters or composed of persons appointed for fixed terms. Among the most
common independent special districts are the 341 fire protection districts and the
295 community service districts that have directly elected boards of directors, and
the 253 public cemetery districts that have appointed boards of trustees. Depend-
ent special districts depend on other legislative bodies to govern them. A city
council or a county board of supervisors can be a district's ex oicio governing
board. For example, county boards of supervisors govern 35 of the 44 dependent
fire protection districts and city councils govern the other 9 dependent fire protec-
tion districts. All of the 873 County Service Areas are dependent special districts,
governed ex officio by county boards of supervisors.
Examples of Independent and Dependent Districts
County- City-
Total Independent Dependent Dependent
County service areas 873 0 873 0
Fire protection districts 385 341 35 9
Community service districts 314 295 14 5
Cemetery districts 253 253 0 0
Recreation & park districts 110 94 13 3
Who votes? Registered voters who reside within the districts' boundaries
elect most independent special districts' governing boards. Observers call them
registered-voter districts. However, state law allows landowners to elect the gov-
erning boards of some special districts. For example, most of the 141 California
Water Districts are landowner-voter districts. The state statutes governing land-
owner-voter districts assign voting power to the landowners in proportion to the
amount of land they own. In 1972, the United State Supreme Court's Salyer sand
Company v. Tulare Lake Basin Water Storage District decision upheld landowner-
voting because nearly all of the water that the District delivered went to irrigate
farmland; very little was for domestic consumption. Because the District provided
no services to the general public, the Court held that it was acceptable for state law
to avoid the usual constitutional doctrine of one-person-one-vote.
6
Policies and implementation. Although there is no bright-line that crisply
separates policy making from policy implementation, governing boards are usually
the policy-makers and key appointed officials usually carry out the boards' poli-
cies. Special districts' boards of directors make policy; general managers carry out
policies. In the real world of practical local politics, general managers often gener-
ate policy proposals for their governing boards to adopt. Likewise, board members
often supervise district employees' work, especially in smaller agencies. District
boards and managers admit that they sometimes step on each others' political toes -
-- some strong managers drive their boards into adopting policies and intrusive
board members can micro-manage daily operations.
Sorting out and then respecting these roles can be difficult, particularly where an
agency has a political history of interference. To help local officials distinguish
their respective roles, the Legislature has amended the state laws that govern three
types of special districts.
Cemetery districts
A legislative body of at least three members known as the board of trustees
shall govern every district. The board of trustees shall establish policies for
the operation of the district. The board of trustees shall provide for the
faithful implementation of those policies which is the responsibility of the
employees of the district. - Health & Safety Code §9020, added in 2003
Mosquito abatement and vector control districts
A legislative body of at least five Inembe,s known as the board of trustees
shall govern every district. The board of trustees shall establish policies.for
the operation of the district. The board of trustees shall provide for the
faithful implementation of those policies which is the responsibility of the
employees of the district. - Health & Safety Code §2020, added in 2002
Recreation and park districts
A legislative body known as the board of directors shall govern every dis-
trict. The board of directors shall establish policies for the operation of the
district. The board of directors shall provide for the faithful implementation
of those policies which is the responsibility of the employees of the district.
- Public Resources Code §5784 (a), added in 2001
The Senate Local Government Committee wrote these statements of statutory
guidance into the state laws that govern the cemetery districts (SB 341 in 2003),
the mosquito abatement and vector control districts (SB 1588 in 2002), and the rec-
reation and park districts (SB 707 in 2001). The special district officials who ad-
vised the Committee on these bills welcomed the new statutory declarations be-
cause they said they would have practical benefit in their communities. Although
these admonitions will not stop conflicts between determined board members and
district managers, the language may help sort out their respective roles when fric-
tion occurs.
■►Should the Legislature insert the statutory language that defines the re-
spective roles of these districts' governing boards and their staff into the state laws
that govern other types of special districts?
0-Should the Legislature require districts' governing boards to adopt for-
mal statements that spell out the respective roles of the board and its employees?
•- What happens when a district's general manager believes that a board
member has violated district policies or state laws? How does an employee con-
front elected or appointed board members with perceived wrongdoing?
■►Should the Legislature provide whistle-blower protections to district em-
ployees who allege wrongdoing by district directors?
Compensation. There is no standard statutory scheme for special districts
to compensate the members of their governing boards. A few statutes permit dis-
tricts to pay regular monthly salaries, most allow stipends for attending meetings,
and some let the board members recover their expenses. In addition, state law al-
lows all local governments --- including special districts --- to provide benefits to
governing board members. Local practices vary widely, with some districts paying
the maximum amounts allowed by law, while other districts do not offer any com-
pensation. Even within the same district, some board members accept compensa-
tion; others decline the offer.
In 1987, the Senate Local Government Committee reviewed these practices at an
interim hearing on "Deregulating Local Officials' Compensation." There has not
been a comprehensive review since then.
Salaries. Although rare, some districts have statutory permission to pay regular
monthly salaries to their board members. For example, the East Bay Municipal
Water District can pay its board members monthly salaries of up to $600 a month,
with 5% annual increases (Public Utilities Code §11908.1, amended by SB 1606,
Petris, 1986). Irrigation districts that are in the electricity business can pay their
8
board members monthly salaries of up to $600 or annual salaries of up to $15,000
(Water Code §21166, amended by SB 1805, Kelley, 1998). The Imperial Irriga-
tion District can pay its directors annual salaries equivalent to the salaries of the
Imperial County Board of Supervisors (Water Code §22840, amended by SB 454,
Kelley, 1997).
Substituting regular salaries for specific stipends calls into question the nature of
local public service. Is service on a district's governing board a voluntary vocation
or a professional career? Is a salary an inducement to work full-time on a district's
governance? Should a stipend partially offset the regular earnings that an elected
official must forego in order to attend to the public's business? Without decent
salaries or stipends, perhaps only the wealthy can afford to be on districts' govern-
ing boards.
0- Should the Legislature stop the practice of paying salaries to special dis-
tricts' governing boards, converting these payments to stipends?
Stipends. When state law allows agencies to compensate the members of their
governing boards, the most common form is a specific stipend. Districts pay sti-
pends to their governing officials for attending a meeting or performing a day's
work, following statutory schedules. Recreation and park districts, for example,
may pay stipends of up to $100 to directors for attending board meetings but a di-
rector can't receive more than $500 a month (Public Resources Code §5784.15).
Until 1984, districts would sponsor bills seeking legislative approval to boost the
amounts of their directors' stipends. Tired of acting on repeated requests for what
they perceived as a local matter, legislators partially deregulated many districts'
stipends. Legislation authored by the Chairman of the Senate Agriculture and Wa-
ter Resources Committee raised water districts' stipends to $100 a meeting and
then allowed the districts to boost these stipends if they adopt local ordinances. A
district's ordinance is referendable and the statute doubles the amount of time that
opponents have to circulate referendum petitions from the usual 30 days to 60 days
(Water Code §20200, et seq., added by SB 1370, Ayala, 1984). In 2000, the Legis-
lature extended these procedures to sanitary, sanitation, and fire districts (SB 1559,
Kelley, 2000, and SB 1756, Kelley, 2000), and later to recreation and park districts
(SB 707, Senate Local Government Committee, 2001) and cemetery districts (SB
341, Senate Local Government Committee, 2003).
9
In 1989, the Legislature increased the number of meetings for which districts can-
can pay stipends from 6 meeting a month to 10 meetings a month (Water Code
§20202, amended by AB 653, Jones, 1989).
■►Should the Legislature reduce the number of meetings eligible for sti-
pends from 10 a month back to 6? Lower the number to 4 a month?
Many districts' statutes provide an open-ended definition of a meeting that quali-
fies for a stipend. For example, the Recreation and Park District Law says that "a
meeting of the board of directors includes, but is not limited to, regular meetings,
special meetings, closed sessions, emergency meetings, board field trips, district
public hearings, or meetings of a committee of the board." The maximum monthly
amount is $500 (Public Resources Code §5784.15).
A November 5, 2003, editorial in the Sacramento Bee scoffed at "10 of the more
creative definitions of `meeting' as defined" by some water districts, including:
• Two water district directors meeting for lunch.
• Two water district directors attending a water art gala.
• Chatting privately with the general manager.
• Attending a Little League function.
• Participation on a conference call on water reuse.
The Sacramento Bee editorial called on legislators to "come up with a reasonable
definition of a water meeting that merits a modest public stipend," suggesting that
stipends be limited to publicly noticed meetings.
■►Should the Legislature limit stipends to official meetings that are noticed
and conducted under the Brown Act?
Expenses. Nearly all special districts' principal acts allow them to reimburse gov-
erning board members for the expenses they incur while on district business.
There are many variations on this theme. For example, a recreation and park dis-
trict can pay its directors' expenses in addition to paying stipends (Public Re-
sources Code §5784.15). But a cemetery district can pay its trustees "their actual
and necessary traveling and incidental expenses incurred while on official business
other than a meeting of the board" (Health & Safety Code §9031[c]). Mosquito
abatement districts cannot pay stipends to their trustees but they can pay expenses.
In lieu of paying for their actual expenses, district trustees can receive $100 a
month (Health & Safety Code §2030).
14
• Districts to publicize their reserves.
• Policy-makers to integrate enterprise district reserve information into infra-
structure planning.
• Guidelines for prudent reserves.
One response to the Little Hoover Commission's recommendations was a 2001 law
that requires the State Controller to report on the districts' fund balances, retained
earnings, fixed assets, and cash earnings. The State Controller must report this in-
formation for the 250 special districts with the largest annual total revenues. In-
stead of issuing a printed document, the State Controller reports this information
electronically (Government Code §12463.1 [c], amended by SB 282, Dunn, 2001).
In October 2003, the State Controller's Office released its second annual electronic
report, covering the 2001-02 fiscal year: http://Iars.sco.ca.gov/sb282.
*►Should the Legislature ask the State Controller's Office to post additional
information about special districts on the its website?
"-If so, which types of fiscal information would be most useful to local resi-
dents and property owners?
Another legislative response to the Little Hoover Commission's recommendations
has been to require some districts to formally account for their budgetary reserves
and make it harder for district boards to transfer funds from restricted reserves
back to their general funds. Based on provisions the 1987 Fire Protection District
Law for a capital reserve account (Health & Safety Code §13902), legislators
tightened up the use of reserve finds when it rewrote the Recreation and Park Dis-
trict Law (SB 707, Senate Local Government Committee, 2001), the Mosquito
Abatement and Vector Control District Law (SB 1588, Senate Local Government
Committee, 2002), and the Public Cemetery District Law (Senate Local Govern-
ment Committee, 2003).
As part of their annual budgets, these special districts must now distinguish be-
tween restricted reserves and an unallocated general reserve. For example, a mos-
quito abatement district can put money aside in separate restricted reserves for
public health emergencies, capital and asset preservation, and contingencies, in ad-
dition to an unallocated general reserve (Public Resources Code §2070). Money
placed in a restricted reserve can be spent only for that fund's declared purpose. In
a public health emergency such as an outbreak of the West Nile virus, a mosquito
abatement district's board of trustees can temporarily transfer funds to its public
health emergency reserve from other its other restricted reserves. This transfer re-
9
In 1989, the Legislature increased the number of meetings for which districts can-
can pay stipends from 6 meeting a month to 10 meetings a month (Water Code
§20202, amended by AB 653, Jones, 1989).
■-Should the Legislature reduce the number of meetings eligible for sti-
pends from 10 a month back to 6? Lower the number to 4 a month?
Many districts' statutes provide an open-ended definition of a meeting that quali-
fies for a stipend. For example, the Recreation and Park District Law says that "a
meeting of the board of directors includes, but is not limited to, regular meetings,
special meetings, closed sessions, emergency meetings, board field trips, district
public hearings, or meetings of a committee of the board." The maximum monthly
amount is $500 (Public Resources Code §5784.15).
A November 5, 2003, editorial in the Sacramento Bee scoffed at "10 of the more
creative definitions of `meeting' as defined" by some water districts, including:
• Two water district directors meeting for lunch.
• Two water district directors attending a water art gala.
• Chatting privately with the general manager.
• Attending a Little League function.
• Participation on a conference call on water reuse.
The Sacramento Bee editorial called on legislators to "come up with a reasonable
definition of a water meeting that merits a modest public stipend," suggesting that
stipends be limited to publicly noticed meetings.
W Should the Legislature limit stipends to official meetings that are noticed
and conducted under the Brown Act?
Expenses. Nearly all special districts' principal acts allow them to reimburse gov-
erning board members for the expenses they incur while on district business.
There are many variations on this theme. For example, a recreation and park dis-
trict can pay its directors' expenses in addition to paying stipends (Public Re-
sources Code §5784.15). But a cemetery district can pay its trustees "their actual
and necessary traveling and incidental expenses incurred while on official business
other than a meeting of the board" (Health & Safety Code §9031[c]). Mosquito
abatement districts cannot pay stipends to their trustees but they can pay expenses.
In lieu of paying for their actual expenses, district trustees can receive $100 a
month (Health & Safety Code §2030).
10
Critics say that some districts pay for their board members' expenses without ob-
taining receipts or other supporting documentation. Further, say the critics, some
of these expenses are unworthy of public officials: large cell-phone bills, first class
airfare, foreign trips, bar tabs, extravagant meals, and luxurious hotel rooms.
W Should the Legislature require special districts' boards to annually adopt
written policies for expense payments?
W Should the Legislature clarify that districts' expense records must be dis-
closed under the Public Records Act?
W Should the Legislature limit special districts' expense payments to the per
diem and travel amounts permitted for state workers?
W Should the Legislature restrict reimbursements to only those expenses
that a district's board approves in advance or that are consistent with a set of re-
imbursement policies that a district must publicly review and adopt each year?
W Should the Legislature prohibit the practice of advancing travel funds to
board members?
+Should the Legislature extend these reforms to cities and counties?
Benefits. For nearly 65 years, state law has allowed all local agencies --- including
special districts --- to provide their governing board members with a wide variety
of fringe benefits in addition to their stipends, salaries, or expenses (AB 2103,
Desmond, 1939). These benefit programs include group insurance for hospital,
medical, surgical, disability, legal, dental, life insurance, income protection, and
annuities (Government Code §53200, et seq.). Local agencies can also allow their
governing board members to participate in deferred compensation plans (Govern-
ment Code §53212, et seq.) and pension trusts (Government Code §53215, et seq.)
just like their employees.
Paying benefits to former local elected officials grew from several smaller legisla-
tive decisions. By the late 1970s, some counties were already paying the premi-
ums on group insurance benefits for former county supervisors. In 1979, the Leg-
islature codified this practice, allowing all local agencies to pay health and welfare
benefits to "retired" elected officials (Government Code §53201, added by AB
1742, Thurman, 1979). Responding to an Attorney General's opinion, the Legisla-
11
ture clarified the law and allowed local agencies to pay health and welfare benefits
to "former" elected officials (AB 2162, Thurman, 1980) who had served at least 12
years (AB 1572, Marguth, 1982). At the request of the Los Angeles Unified
School District, the Legislature reduced the minimum service to one term of office,
provided that the board member paid the full cost (SB 98, Carpenter, 1982).
In 1993, the Legislature closed off access to the Public Employees Retirement Sys-
tem for newly elected members of school boards and special districts' governing
boards but not to city councilmembers or county supervisors (Government Code
§20321 [c], amended by SB 53, Russell, 1993).
In 1994, responding to allegations of high (but undocumented) costs to local agen-
cies, the Legislature imposed new restrictions on health and welfare benefits (SB
1983, Leslie, 1994). Local agencies can provide health and welfare benefits to
former elective members of their legislative bodies only under specific conditions:
• A local agency that provided benefits to former elective officials before January
1, 1995, cannot provide those benefits to an official to takes office after that
date, unless the person pays for the benefits.
• A local agency that did not provide benefits to former elective officials before
January 1, 1994, cannot provide those benefits to former elective officials un-
less they pay for the benefits.
• A local agency that provided benefits to former elective officials before January
1, 19Q4, can continue to provide those benefits to those former elective offi-
cials.
*-Should the Legislature further limit the benefits that special districts can
provide to former elective officials?
•-Should the Legislature extend any new limits on benefits to former mem-
bers of city councils and county boards of supervisors?
Ethical Behavior
Only a few special districts' principal acts remind their governing boards that leg-
islators expect them to act in the public interest. For example, when legislators
rewrote the state laws governing mosquito abatement districts, the new statute told
12
the districts' trustees that they must "exercise their independent judgment on behalf
of the interests of the residents, property owners, and the public as a whole in fur-
thering the purposes and intent" of the Mosquito Abatement and Vector Control
Law (Health & Safety Code §2022 [d]). The new Public Cemetery District Law
contains a similar statutory admonition (Health & Safety Code § 9022 [b]).
In 2001, the Senate Agriculture and Water Resources Committee's staff gathered
press accounts of 11 special districts with ethical lapses, some of them criminal.
The newspaper articles described expense account padding, diversion of public
funds to private uses, excessive travel costs, and nepotism from 1994 to 2001.
Upset by these articles, the Committee's Chair noted that state law requires legisla-
tors, legislative staff, and legislative advocates to take regular training in ethics
(Government Code §8958 and §86103). Senator Costa authored a bill that would
have required water districts' board members and their executive officers to attend
regular ethics courses (SB 609, Costa, 2001).
SB 609 would have required each water district to offer an annual, four-hour ethics
course to its board members and executive officers. The bill would have required
board members and executives to take the required ethics course once every two
years. The ethics course would have covered potential ethical abuses relating to:
• Business relationships with contractors and vendors.
• Campaign contributions from bidders, contractors, or subcontractors.
• Using the district's funds for personal expenses.
SB 609 would have required water districts to pay for the costs of these ethics
courses, creating a state mandated local program. The hill disclaimed the state's
responsibility to pay for these programs, citing the water districts' ability to raise
service charges. Faced with fiscal opposition, Senator Costa removed these provi-
sions from SB 609 and they did not become law.
■-Should the Legislature require special districts' governing boards and
key staff to take ethics training, much like legislators, staff, and lobbyists?
W Should the Legislature pay for this state mandated local program, or
should legislators require special districts to finance their own courses?
*-Should the Legislature direct the Fair Political Practices Commission (or
another state agency) to develop a standard curriculum on ethical practices for
special districts?
13
■� Would formal training change the behavior of public officials who may be
tempted to abuse their offices for personal gain, or is mandatory ethics training
just another example of state interference in local affairs?
0- Should the Legislature extend these reforms to cities and counties?
Financial Reporting
Special districts generate revenues from several sources, including property taxes,
benefit assessments, and fees for services. Enterprise districts run much like busi-
nesses, delivering specific services to paying customers. About 27% of special
districts are enterprise districts, providing services that include airports, harbors,
ports, hospitals, transit, waste disposal, water, and electricity. Enterprise districts'
primary funding sources are the fees that they charge to recover the costs of pro-
viding services. However, some enterprise districts still get a share of local prop-
erty tax revenues. Some critics say that these property tax revenues subsidize the
districts' enterprise operations, resulting in lower service charges. In 1999-00, en-
terprise districts generated about $15.5 billion in revenues.
Non-enterprise districts deliver services that generally benefit entire regions,
communities, or neighborhoods. These public services --- such as cemeteries, fire
protection, flood control, libraries, and parks --- do not lend themselves to service
charges and fees. Non-enterprise districts rely primarily on property tax revenues
to fund their operations. In 1999-00, non-enterprise districts' revenues were about
$5.8 billion.
The State Controller publishes annual reports on special districts' financial transac-
tions. Although the reports have lagged in recent years --- the most current report
covers the 1999-00 fiscal year --- improvements in the Controller's data collection
and reporting suggest that the annual reports will be more timely in the future. Re-
cent legislation requires the State Controller's Office to publish its special district
report by October 1 of each year (Government Code §12463, amended by SB
1068, Senate Local Government Committee, 2003).
In 2000, the Little Hoover Commission drew attention to special districts when it
released a report recommending that the "Governor and Legislature should enact
policies that will ensure prudent management of special district reserve funds and
incorporate these resources into regional and statewide infrastructure planning."
Specifically, the Commission recommended that the state should require:
14
i
• Districts to publicize their reserves.
• Policy-makers to integrate enterprise district reserve information into infra-
structure planning.
• Guidelines for prudent reserves.
One response to the Little Hoover Commission's recommendations was a 2001 law
that requires the State Controller to report on the districts' fund balances, retained
earnings, fixed assets, and cash earnings. The State Controller must report this in-
formation for the 250 special districts with the largest annual total revenues. In-
stead of issuing a printed document, the State Controller reports this information
electronically (Government Code §12463.1 [c], amended by SB 282, Dunn, 2001).
In October 2003, the State Controller's Office released its second annual electronic
report, covering the 2001-02 fiscal year: hqp://Igrs.sco.ca.gov/sb282.
0-Should the Legislature ask the State Controller's Office to post additional
information about special districts on the its website?
W If so, which types of fiscal information would be most useful to local resi-
dents and property owners?
Another legislative response to the Little Hoover Commission's recommendations
has been to require some districts to formally account for their budgetary reserves
and make it harder for district boards to transfer funds from restricted reserves
back to their general funds. Based on provisions the 1987 Fire Protection District
Law for a capital reserve account (Health & Safety Code §13902), legislators
tightened up the use of reserve finds when it rewrote the Recreation and Park Dis-
trict Law (SB 707, Senate Local Government Committee, 2001), the Mosquito
Abatement and Vector Control District Law (SB 1588, Senate Local Government
Committee, 2002), and the Public Cemetery District Law (Senate Local Govern-
ment Committee, 2003).
As part of their annual budgets, these special districts must now distinguish be-
tween restricted reserves and an unallocated general reserve. For example, a mos-
quito abatement district can put money aside in separate restricted reserves for
public health emergencies, capital and asset preservation, and contingencies, in ad-
dition to an unallocated general reserve (Public Resources Code §2070). Money
placed in a restricted reserve can be spent only for that fund's declared purpose. In
a public health emergency such as an outbreak of the West Nile virus, a mosquito
abatement district's board of trustees can temporarily transfer funds to its public
health emergency reserve from other its other restricted reserves. This transfer re-
15
quires a majority vote of the board's total membership. Otherwise, state law re-
quires a 4/5 vote of the district's board to transfer funds from a restricted reserve to
the general fund (Public Resources Code §2071). Similar provisions exist for rec-
reation and park districts (Public Resources Code §5788 and §5788.9) and for
cemetery districts (Health & Safety Code §9070 and §9071).
*-Should the Legislature amend the principal acts of other types of special
districts, including water districts, to limit the use of restricted reserves and to re-
quire extraordinary votes before districts can transfer money out of their reserves?
Oversight Efforts
One of the politically least attractive but potentially most powerful legislative du-
ties is overseeing existing institutions and their programs. Voters and public offi-
cials create new agencies and services to respond to pressing problems, only to
forget about them over time. Institutional inertia, changing social and political
goals, and nearly automatic budgeting combine to allow archaic agencies and inef-
fective programs to persist.
Legislators, local officials, and their shared constituents can avoid perpetuating
outdated programs by insisting that organizations undertake regular oversight ef-
forts. In short, they should ask: How do we know that they did what we said we
wanted them to do? Special districts face this question in four ways:
• Regular audits.
Special audits.
• Annual financial reports.
• Municipal service reviews.
Regular audits. Since the mid-1950s, state law has required county auditors to
annual audit special districts' books (Government Code §26909). A county auditor
must either audit a special district or contract with a certified public accountant to
perform the work. The audit must follow the State Controller's requirements and
conform to generally accepted auditing standards. The district pays for the audit.
A district can shift from an annual audit to biennial audits with the unanimous ap-
proval of the district's governing board. A district can also shift to an audit once
every five years if the size of the district's budget is below a threshold set by the
county board of supervisors.
16
w Should the Legislature repeal the opportunities for biennial audits or au-
dits every five years, and require annual audits for all special districts?
W Should the Legislature require special districts to change auditors peri-
odically?
State law also allows a county auditor to review a special district's books "at any
reasonable time and place," provided that the district is located wholly within that
county (Government Code §26910).
Good management practices suggest that an organization's governing body review
its audit with the auditor. A special district's governing board should invite the
district's auditor to present the audit at a public meeting and solicit additional ad-
vice about the condition of its fiscal records and management practices. Some
special districts follow this practice to educate themselves and to listen for any im-
pending problems.
W Should the Legislature require special districts' governing boards to meet
with their independent auditors?
W Should a district's management be present when the governing board
meets with its auditor?
W If so, should these discussions occur in a public meeting, or should the
Legislature allow a special district's board to Iueet with its auditor at a closed
meeting? Should the Legislature amend the Brown Act to allow for this closed
meeting?
Unlike the statutes governing redevelopment agencies' annual audits, state law
does not require special districts' governing boards to respond to their audits. If
the annual report identifies major audit violations, a redevelopment agency must
tell its city council. The city council then has 21 days to act on the redevelopment
agency's annual report, including any major violations (Health & Safety Code
§33080.2).
w Should the Legislature require special districts' governing boards to take
prompt remedial action in response to major audit violations?
W If so, which errors and omissions should state law identify as major audit
violations?
17
When the State Controller's Office compiles redevelopment agencies' annual re-
ports for publication, the resulting report identifies the agencies that received audit
exceptions from their independent auditors. The Controller must compile a list of
the agencies with major audit violations and then determine if these agencies have
corrected their problems. If not, the Controller forwards the list to the Attorney
General's Office which can file suits to force agencies to correct their major audit
violations (Health & Safety Code §33080.8, added by SB 497, Rainey, 1999).
W Should the Legislature follow the precedent that it set with redevelopment
agencies and require the State Controller to identify the special districts that have
major audit violations?
W If special districts fail to correct their major audit violations, should the
State Controller forward the districts' names to the Attorney General for enforce-
ment actions?
Reacting to audit problems in the public sector, new auditing standards are taking
effect. In 1999, the Governmental Standards Accounting Board (GASB) released
revised requirements for governments' financial statements. GASB Statement No.
34 requires financial statements to report on the agency's overall fiscal health, con-
tain more information about service costs, include information about the agency's
infrastructure assets, and present a narrative discussion of the agency's financial
performance. Because the GASB 34 changes were so significant, GASB called for
a phased implementation based on a government agency's annual revenues.
GASB 34 applies to all agencies by the 2003-04 fiscal year. Some observers be-
lieve that adherence to the GASB 34 will improve the quality of districts' audits.
•F How have special districts' audits implemented GASB 34?
■r Have the new auditing standards changed how special districts' govern-
ing boards use the information contained in their independent audits?
W What can the Legislature do to promote better special district audits?
In 2002, the American Institute of Certified Public Accountants released its
"Statement on Auditing Standards No. 99, Consideration of Fraud in a Financial
Statement." SAS 99 guides auditors on how to use their "professional skepticism."
18
W Are local governments --- including special districts --- asking their audi-
tors to implement SAS 99 as part of their regular audits?
W Should the State Controller require special districts' auditors to follow
SAS 99?
In 2000, the Legislature authorized the State Controller to refer inadequate school
district audits to the California Board of Accountancy for hearings and possible
sanctions. If the Board determines that an accountant had performed poorly for
two consecutive years, the accountant cannot audit school districts for three years
(Education Code §41020.5, added by AB 2889, Assembly Committee on Con-
sumer Protection, Governmental Efficiency, and Economic Development, 2000).
In 2002, the Legislature authorized the Controller to perform quality reviews of
school districts' audits and similarly refer poorly performing accountants to the
California Board of Accountancy (Education Code §14404.2, added by AB 2834,
Migden, 2002).
W Should the Legislature follow the precedent that it set with school districts
and ask the State Controller to perform quality reviews of special districts' audits?
W If so, and if the State Controller finds poorly performing accountants,
should the Legislature require the Controller to refer them to the California Board
of Accountancy for sanctions?
Special audits. When suspicions attract attention or when new leadership
assumes power, public officials call for special audits of public agencies' spending
and management practices. For example, the Sacramento Suburban Water Dis-
trict's board of directors hired Richardson & Company to review the District's
business expense reimbursement and payroll practices, and the practices of its
predecessor agencies, the Northridge Water District and the Arcade Water District.
The accounting firm submitted reports in January and February 2003. The District
has posted the firm's February report along with a memorandum from the Board's
ad hoc audit committee on its website: www.sswd.org.
In August 2003, Assembly Member Rebecca Cohn, chair of the Joint Legislative
Audit Committee, proposed that the Bureau of State Audits review the financial
status, reserves, compensation practices, and meeting practices of a representative
sample of independent water districts.
W What is the status of the Bureau of State Audits' reviews?
19
In October 2003, State Senator Deborah Ortiz asked the State Controller to audit
five water districts:
• Fair Oaks Water District (Sacramento County).
• Otay Water District (San Diego County).
• Rio Linda/Elverta Community Water District (Sacramento County).
• Sacramento Suburban Water District (Sacramento County).
• West Basin Municipal Water District (Los Angeles County).
ml- What is the status of the State Controller's audits?
Annual reports. Local agencies --- including special districts --- must file
copies of their annual budgets with the county auditor. Local agencies must file
their budgets within 60 days of the start of the fiscal year; for most local agencies
that deadline is the end of August. County auditors can exempt agencies from this
requirement. County auditors must hold these budgets on file "for public inspec-
tion at all reasonable hours" (Government Code §53901).
Within 90 days after the end of their fiscal years, local agencies --- including spe-
cial districts --- must send reports on their financial transactions to the State Con-
troller. The deadline is 110 days if local officials file their reports electronically.
The Controller must formally adopt uniform accounting and reporting procedures
for these special district reports (Government Code §53891). It is a misdemeanor
for local officials to "willfully and knowingly" provide false reports (Government
Code §53894).
An annual financial transaction report must contain (Government Code §53892):
• The amount of property taxes levied.
• The amount of property taxes collected.
• Total annual revenue, identifying sources and amounts.
• Total annual expenditures, identifying purposes and amounts.
• Total assessed value of property.
• Information on bonds and other indebtedness.
• Population information.
■-Should the Legislature increase the amount of information it requires
special districts to provide in their annual financial transactions reports? If so,
what additional information would help legislators monitor districts' activities?
20
If the State Controller suspects that a local government --- including a special dis-
trict --- has filed a false annual report, the Controller can appoint an accountant to
investigate and report. If the State Controller orders an investigation for the same
agency in two consecutive years, the Controller must file the results of the investi-
gation with the county grand jury (Government Code §12464).
W Has the State Controller ordered investigations of special districts' an-
nual reports because of suspected false information?
W Has the State Controller referred any investigations to grand juries?
W Should the Legislature expand the investigative powers of grand juries to
examine special districts' annual financial reports?
Local officials must give copies of these completed reports to anyone who asks and
they cannot charge more than 250 a copy (Government Code §53893).
W Should the Legislature allow local officials to recover the full cost for
copying annual reports, the practice allowed by the Public Records Act?
Local agencies that fail to file their reports with the State Controller face civil pen-
alties ranging from $1,000 to $5,000, depending on the amount of their annual
revenues (Government Code §53895). According to the State Controller, five spe-
cial districts failed to file their annual reports for 1998-99, and 24 districts failed to
file their 1999-00 required reports. The five districts that failed to file in 1998-99
also failed to file in 1999-00:
• Donner Summit Public Utility District.
• Goshen Community Services District
• Greater Hayfork Valley Park and Recreation District.
• Southern California International Airport Authority.
• Volta Community Services District.
When redevelopment agencies fail to file their annual reports in consecutive years,
state law requires increasingly severe civil penalties. If a redevelopment agency
fails to report for three consecutive years, the State Controller conducts the audit
and the agency pays the state's costs (Government Code §53895.5).
. 21
Penalties for Redevelopment Agencies that Fail To Report
Annual I" Year 2nd Year P Year
Revenues Penalty Penalty Consequence
< $100,000 $1,000 $2,000 Controller audits
$100,1014250,000 $2,500 $5,000 Controller audits
>$250,000 $5,000 $10,000 Controller audits
W Should the Legislature follow the precedent that it set for redevelopment
agencies and impose graduated penalties for special districts that repeatedly fail to
file their required reports?
Municipal service reviews. The newest oversight mechanism available to
local officials are the municipal service reviews conducted by Local Agency For-
mation Commissions (LAFCOs) in each county.
For more than 30 years, state law has required the LAFCOs to adopt a sphere of
influence for each city and special district in their counties. A sphere of influence
designates the city or district's future service area and boundaries. When the
Commission on Local Governance in the 21 S` Century reviewed the LAFCOs' stat-
utes and practices, it noted that there was no specific statutory schedule to revise
the spheres of influence. In 2000, the Legislature accepted the Commission's rec-
ommendation and required the LAFCOs to update the spheres of influence for all
cities and special districts. The first deadline will be January 1, 2006 (Government
Code §56425, amended by AB 2838, IIertzberg, 2000).
The Legislature also accepted another recommendation from the Commission on
Local Governance in the 2151 Century and required the LAFCOs to undertake peri-
odic service reviews as they prepare to revise their spheres of influence. A mu-
nicipal service review must determine:
• Infrastructure needs or deficiencies.
• Growth and population projections.
• Financing constraints and opportunities.
• Cost avoidance opportunities.
• Opportunities for rate structuring.
• Opportunities for shared facilities.
• Government structure options.
• Evaluations of management efficiencies.
• Local accountability and governance.
22
To help the LAFCOs prepare their municipal service reviews, the Legislature di-
rected the Governor's Office of Planning and Research (OPR) to prepare advisory
guidelines by July 1, 2001 (Government Code §56430, added by AB 2838, Hertz-
berg, 2000). OPR released its advisory guidelines in August 2003, more than two
years late.
These municipal service reviews should pull together relevant information about
what special districts and cities do, how they are financed, and how their services
relate to the public services delivered by other, adjacent districts and cities. Mu-
nicipal service reviews should develop the information that could become the basis
for proposals to consolidate services to achieve economies of scale. They may also
spark proposals that would lead to the consolidation of cities and districts.
0-How will local officials and state legislators use the information from the
LAFCOs' municipal service reviews to evaluate the effectiveness and responsive-
ness of special districts?
■- Because of OPR's delay in issuing its advisory guidelines, will the LAF-
COs be able complete their municipal service guidelines before the January 1,
2006 deadline for revising special districts' spheres of influence?
■-If not, should the Legislature postpone the deadline for revising spheres
of influence?
23
Sources & Credits
In preparing this background policy paper, the Committee's staff relied on:
Detwiler, Peter & Leslie McFadden, Deregulating Local Officials' Compensation,
Senate Local Government Committee, October 1987.
Detwiler, Peter & Jennifer Swenson, Taking Their Pulse: How The LAFCOs Im-
plemented AB 2838 (Hertzberg 2000), Senate Local Government Committee,
September 2002.
Lewis, Paul, Deep Roots: Local Government Structure in California, Public Policy
Institute of California, 1998.
Little Hoover Commission, Special Districts: Relics of the Past or Resources for
the Future?, Little Hoover Commission, May 2000.
Mizany, Kimia & April Manatt, What's So Special About Special Districts? A
Citizen's Guide to Special Districts in California (Third Edition), Senate Local
Government Committee, February 2002.
Philp, Tom, "Let's meet for lunch" (editorial), Sacramento Bee, November 5,
2003.
State Controller's Office, Special Districts Annual Report, Fiscal Year 1998-99,
Office of the State Controller, March 2002.
State Controller's Office, Special Districts Annual Report, Fiscal Year 1999-00,
Office of the State Controller, April 2003.
Swenson, Jennifer, "Special District Fact Sheet," Senate Local Government Com-
mittee, November 2003.
ow Qq# ow
This background policy paper was written and produced by the Committee's Staff
Director Peter Detwiler and Committee Assistant Elvia Diaz.
AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
February 25, 2004 — 7:00 P.M.
Agenda Posting: In accordance with the requirements of California Government Code Section
54954.2, this agenda has been posted in the main lobby of the District's Administrative offices not
less than 72 hours prior to the meeting date and time above. All written materials relating to each
agenda item are available for public inspection in the office of the Board Secretary.
Items Not Posted: In the event any matter not listed on this agenda is proposed to be submitted to
the Board for discussion and/or action, it will be done in compliance with Section 54954.2(b) as an
emergency item or because there is a need to take immediate action, which need came to the
attention of the Board subsequent to the posting of agenda, or as set forth on a supplemental
agenda posted in the manner as above, not less than 72 hours prior to the meeting date.
Accommodations for the Disabled: The Board of Directors Meeting Room is wheelchair accessible.
If you require any special disability related accommodations, please contact the Orange County
Sanitation District Board Secretary's office at (714) 593-7130 at least 72 hours prior to the
scheduled meeting. Requests must specify the nature of the disability and the type of
accommodation requested.
Items Continued: Items may be continued from this meeting without further notice to a Committee
or Board meeting held within five (5) days of this meeting per Government Code Section
54954.2(b)(3).
Meeting Adjournment: This meeting may be adjourned to a later time and items of business from
this agenda may be considered at the later meeting by Order of Adjournment and Notice in
accordance with Government Code Section 54955 (posted within 24 hours).
1. Invocation and Pledge of Allegiance
2. Roll Call
3. Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any. (See listing in Board Meeting folders)
City/Agency Active Director Alternate Director
Fullerton Don Bankhead Leland Wilson
Tustin Tony Kawashima Doug Davert
Board of Supervisors Jim Silva Charles V. Smith
4. Appointment of Chair pro tem, if necessary
02/25/04
Page 2
5. Public Comments: All persons wishing to address the Board on specific agenda items or
matters of general interest should do so at this time. As determined by the Chair,
speakers may be deferred until the specific item is taken for discussion and remarks
may be limited to three minutes.
Matters of interest addressed by a member of the public and not listed on this agenda
cannot have action taken by the Board of Directors except as authorized by Section
54954.2(b).
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair; consideration of Resolutions or commendations,
presentations and awards
b. Report of General Manager
C. Report of General Counsel
7. If no corrections or amendments are made, the minutes for the regular meeting held on
January 28, 2004 will be deemed approved as mailed and be so ordered by the Chair.
8. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 01/15/04 01/31/04
Totals $10,000,129.14 $16,639,786.91
DIRECTORS: Pursuant to Government Code Section 84308, you are required to disclose
any campaign contribution greater than $250 received in the past twelve months from any
party to a contract involving OCSD. This requires that you identify the contributor by name.
Further, you may not participate in the decision making process to award a contract to such
party. For reference, you are directed to the Register of Warrants as to all current
contractors/vendors with OCSD. For the specifics of Government Code Section 84308,
please see your Director's Handbook or call the office of General Counsel.
CONSENT CALENDAR
All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the
Consent Calendar by a Director, staff member or member of the public in attendance, there will
be no separate discussion of these items. All items on the Consent Calendar will be enacted
by one action approving all motions, and casting a unanimous ballot for resolutions included on
the consent calendar. All items removed from the Consent Calendar shall be considered in the
regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall, upon
recognition by the Chair, state their name, address and designate by number the item to be
removed from the Consent Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar.
02/25/04
Page 3
9. Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
a. (1) Receive and file petition from Robert and Valerie Aronson requesting
annexation of 1.24 acres to Orange County Sanitation District, in the vicinity of
Meads Avenue and Orange Park Boulevard, in an unincorporated area of
Orange County; and,
(2) Adopt Resolution No. OCSD 04-03, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD-39 — Aronson
Annexation).
b. (1) Receive and file petition from Gene Holle, G. Michael Smith and Gary Bryan
Warden requesting annexation of 1.17 acres to Orange County Sanitation
District, in the vicinity of Clark Street and Orange Park Boulevard, in an
unincorporated area of Orange County; and,
(2) Adopt Resolution No. OCSD 04-04, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD-40 — Holle
Annexation).
END OF CONSENT CALENDAR
10. Consideration of items deleted from Consent Calendar, if any.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. STEERING COMMITTEE
Consent Calendar
a. Order draft Steering Committee Minutes for the meeting held on January 28,
2004 to be filed.
Non-Consent Calendar
b. Review and consideration of agenda items considered by the Steering
Committee re the February 25, 2004 meeting.
C. Consideration of items deleted from Steering Committee Consent Calendar, if
any.
12. OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES COMMITTEE (OMTS)
OMITS Consent Calendar
a. Order draft Operations, Maintenance and Technical Services Committee Minutes
for the meeting held on February 4, 2004 to be filed.
02/25/04
Page 4
b. Ratify Change Order No. 1 to Treatment Plant No. 2 North and South Scrubber
Complex Caustic Tank Replacement, Specification No. S-2003-131, with
Jamison Engineering, authorizing an additional amount of$22,800, increasing
the total amount not to exceed $112,489.
C. Authorize the General Manager to award a sole source purchase order to
Schwing America, Inc., for overhauling three Schwing sludge pumps for an
amount not to exceed $129,460, for labor and materials.
d. (1) Approve a budget amendment of$150,000 for Phase III Biotrickling Filter
Demonstration Project, SP-90-7, for a total budget of$925,000, as an alternative
treatment to control odors; and,
(2) Approve Amendment No. 7 to the Study Agreement with the University of
California, Riverside to provide continued support for testing biotrickling filters as
an air emissions control technology for an additional amount of$150,000 for a
total amount not to exceed $355,000.
OMTS Non-Consent Calendar
e. Consideration of items deleted from OMTS Committee Consent Calendar, if any
13. PLANNING, DESIGN AND CONSTRUCTION COMMITTEE (PDC)
PDC Consent Calendar
a. Order draft Planning, Design and Construction Committee Minutes for the
meeting held on February 5, 2004 to be filed.
b. Ratify Change Order No. 5 for Area Classification Study Implementation Plan,
Plant Nos. 1 and 2, Job No. J-35-2, with J.F. Shea Construction, Inc., authorizing
an addition of$214,954, increasing the total contract amount to $14,946,310.
C. Ratify Change Order No. 12 to Primary Clarifiers 16-31 and Related Facilities,
Job No. P1-37, with Margate Construction, authorizing an addition of$22,390,
increasing the total contract amount to $71,241,204.
d. Approve Amendment No. 3 to the Professional Services Agreement with Ninyo &
Moore, to provide for Materials Testing, Inspection, and Geotechnical
Engineering Services, Specification No. PSA-2001-33BD, for FY2003/04 for an
additional amount not to exceed $75,000.
e. Approve Amendment No. 2 to the Professional Services Agreement with Smith
Emery GeoServices, to provide for additional Materials Testing, Inspection, and
Geotechnical Engineering Services, Specification No. PSA-2002-33BD, for
FY2003/04 for an additional amount not to exceed $75,000.
f. Approve Amendment No. 3 to the Professional Services Agreements with MDS
Consulting and Bush & Associates, to provide for additional Surveying Services,
02/25/04
Page 5
Specification No. PSA-2001-3413D, for FY2003/04 for an additional amount not
to exceed $75,000 for each agreement ($150,000 total).
g. Ratify Change Order No. 4 to Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4,
with Steve P. Rados, Inc., authorizing an addition of$380,251, increasing the
total contract amount to $30,685,478.
h. Ratify Change Order No. 1 to Effluent Pump Station Annex, Job No. J-77, with
J.F. Shea Construction, Inc., authorizing a deduction of$1,967,158, decreasing
the total contract amount to $42,768,360.
i. Approve a reimbursement agreement with the City of Tustin to reimburse the
Orange County Sanitation District for the construction cost of two City water line
projects located in Prospect Avenue and Cameron Lane in connection with
Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange Trunk
Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk Improvements,
Contract No. 7-41, and City of Tustin Project Numbers 6106 and 6151, for an
amount of$665,211, plus administrative fees, in a form approved by General
Counsel.
j. (1) Approve Professional Services Agreement with MWH Americas, Inc. for
engineering services for Rehabilitation of Activated Sludge Plant at Plant No. 2,
Job No. P2-74, for an amount not to exceed $2,139,998; and,
(2) Authorize the General Manager to issue Task Authorizations not to exceed
$100,000.
k. Authorize the circulation of the revised Notice of Preparation for the
Rehabilitation of Ellis Avenue Pump Station, Job No. 1-10, for public review.
PDC Non-Consent Calendar
1. (1) Approve Professional Services Agreement with Black & Veatch Corporation
to provide engineering services for Secondary Activated Sludge Facility 2 at
Plant No. 1, Job No. P1-102, for an amount not to exceed $17,896,463;
(2) Authorize the General Manager to issue Task Authorizations not to exceed
$200,000; and,
(3) Authorize the General Manager to issue Task Authorizations between
$200,000 and $500,000 providing there is a time sensitive need and a PDC
meeting cannot be called within 72 hours.
M. Consideration of items deleted from PDC Committee Consent Calendar, if any
14. FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE (FAHR)
FAHR Consent Calendar
a. Order draft Finance, Administration and Human Resources Committee Minutes
for the meeting held on February 11, 2004 to be filed.
02/25/04
Page 6
b. Receive and file Treasurer's Report for the month of January 2004. •
C. Receive and file the Mid-Year Financial Report for the period ending
December 31, 2003.
d. Receive and file Quarterly Investment Management Program Report for the
period October 1, 2003 through December 31, 2003.
e. Receive and file the SWAP Report for the quarter ended December 31, 2003.
f. Adopt Resolution No. OCSD 04-05, Amending Resolution No. OCSD 98-33,
Amending Human Resources Policies and Procedures Manual.
g. Approve SAFETY-POL-115, Backflow Prevention Program, as provided for in
Resolution No. OCSD 02-5, regarding the District's Injury and Illness Prevention
Program Policy.
FAHR Non-Consent Calendar
The following item was considered by the FAHR Committee at the December 10, 2003
meeting, and recommended to go to the January 28, 2004 Board of Directors meeting
with a modified recommendation . The item was inadvertently not included on the
agenda for consideration:
h. Authorize the General Manager to solicit Requests for Proposals to conduct
research services in connection with the Corporate Identity and Public
Awareness Project, Specification No. CS-2003-16213D, in an amount not to
exceed $50,000.
i. Consideration of items deleted from FAHR Consent Calendar, if any.
15. JOINT GROUNDWATER REPLENISHMENT SYSTEM COOPERATIVE COMMITTEE
(JCC)
JCC Consent Calendar
a. Order Joint Groundwater Replenishment System Cooperative Committee
Minutes for the meeting held on January 12, 2004 to be filed.
b. Authorize changing the name of the "Joint Groundwater Replenishment System
Cooperative Committee" to the "GWR System Steering Committee."
JCC Non-Consent Calendar
C. Consideration of items deleted from JCC Consent Calendar, if any.
02/25/04
Page 7
NON-CONSENT CALENDAR
16. (1) Approve Plans and Specifications for Abandonment of Airbase Trunk Sewer-
California Street, Contract No. 6-13-3, on file at the office of the Board Secretary;
(2) Approve Addendum No. 1 to the plans and specifications;
(3) Receive and file bid tabulation and recommendation; and,
(4) Award a construction contract to Mike Prlich and Sons, Inc. for Abandonment of
Airbase Trunk Sewer- California Street, Contract No. 6-13-3, for an amount not to
exceed $507,610.
17. Closed Session
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters, pursuant to Government Code Sections
54956.8, 54956.9, 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted closed
session and are not available for public inspection. At such time as the Board takes
final action on any of these subjects, the minutes will reflect all required disclosures
of information.
a. Convene in closed session, if necessary
1. Confer with Lisa Tomko, Human Resources Director, re Unrepresented
Groups Compensation and Benefits (Government Code Section
54957.6).
2. Confer with General Counsel re Woodside v. Orange County Sanitation
District, et al., Orange County Superior Court Case No. 03CC17413
(Government Code Section 54956.9).
b. Reconvene in regular session
C. Consideration of action, if any, on matters considered in closed session
18. Matters which a Director may wish to place on a future agenda for action and
staff report.
19. Other business and communications or supplemental agenda items, if any
20. Future Meeting Date: The next Board of Directors regular meeting is scheduled for
March 24, 2004, at 7:00 p.m.
02/25/04
Page 8
21. Adjournments
.......................................................................................................................................................................................................................................................................................-
NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Board of
:Directors, items shall be submitted to the Board Secretary no later than the close of business 14 days
:preceding the Board meeting. The Board Secretary shall include on the agenda all items submitted by
:Directors, the General Manager and General Counsel and all formal communications.
::General Manager Blake Anderson (714)593-7110 banderson(cDocsd.com
:Board Secretary Penny Kyle (714)593-7130 pkyle(Qocsd.com
Director/Engineering David Ludwin (714)593-7300 dludwin(Ei)ocsd.com
:Director/Finance/Treasurer Gary Streed (714)593-7550 gstreed ocsd.com
:Director/Human Resources Lisa Tomko (714)593-7145 Itomko(cDocsd.com
Director/Information Technology Patrick Miles (714)593-7280 pmileseocsd.com
:Director/Operations&
Maintenance Bob Ooten (714)593-7020 rooteneocsd.com
:Director/Technical Services Bob Ghirelli (714)593-7400 rghirellieocsd.com
:Communications Services Mgr. Carol Beekman (714)593-7120 cbeekmanna.ocsd.com
:General Counsel Thomas L.Woodruff ( 564-2605 tlwd)wss-law.com
H:\dept\agenda\Board Agendas\2004 Board Agendas\022504 agenda.doc
1
Orange County Sanitation District
MINUTES
BOARD MEETING
JANUARY 28, 2004
sANjTar�o
lg� N�
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
Minutes for Board Meeting ;a
Page 2 n
01/28/04
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District was
held on January 28, 2004, at 7:00 p.m., in the District's Administrative Offices. Following the
Pledge of Allegiance and invocation the roll was called and the Secretary reported a quorum
present as follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
A Shirley McCracken, Chair Bob Hernandez
X Steve Anderson, Vice Chair Steve Simonian
X Don Bankhead Leland Wilson
X Patricia Bortle Robert McGowan
X Brian Brady Peer A. Swan
X Patricia Campbell Paul Yost
X Carolyn Cavecche Steve Ambriz
X Alberta Christy Mike Garcia
X John Collins Larry Crandall
X Bill Dalton Bruce Broadwater
A Brian Donahue David Shawver
X Michael Duvall Keri Lynn Wilson
X Norman Z. Eckenrode Constance Underhill
X James M. Ferryman Arlene Schafer
X Cathy Green Gil Coerper
X Alice B. Jempsa Marilynn M. Poe
Tony Kawashima X Doug Davert
X Beth Krom Christina Shea
X Patsy Marshall Jim Dow
X Roy Moore John Beauman
X Joy Neugebauer Grace Epperson
X Anna L. Piercy Tim Keenan
X Tod Ridgeway Don Webb
X Jim Silva Chuck Smith
Paul Walker X Larry Herman
STAFF MEMBERS PRESENT: Blake P. Anderson, General Manager; Penny Kyle, Board
Secretary; Carol Beekman; Bob Ghirelli; Dave Ludwin; Patrick Miles; Bob Ooten; Gary Streed;
Lisa Tomko; Ingrid Hellebrand; Rich Castillon; Jeremy Baum; Daisy Covarrubias; Norbert Gaia;
Simon Watson; Paula Zeller
OTHERS PRESENT: Thomas Nixon, Assistant General Counsel; Howard Lembke; Don
Hughes; Greg Jewell; Art Perry; Adam Probolsky; Darrell A. Nolta; Bob Lockhart
n Minutes for Board Meeting
Page 3
01/28/04
PUBLIC COMMENTS
Darrell A. Nolta addressed the Board of Directors regarding urban runoff issues.
3. MOVED, SECONDED AND DULY CARRIED: Receive and file minute excerpts from the
following re appointment of active and alternate Directors, as follows:
City/Agency Active Director Alternate Director
Fountain Valley John Collins Larry Crandall
Huntington Beach Cathy Green Gil Coerper
La Palma Paul Walker Larry Herman
Newport Beach Tod Ridgeway Don Webb
Stanton Brian Donahue David Shawver
REPORT OF THE CHAIR
Vice Chair Anderson reported that Chair McCracken was still recovering from surgery and
would be unable to attend meetings for the next four to five weeks.
The meeting schedule for February was reviewed. It was noted that a special orientation
meeting for new Directors would be held on Wednesday, February 18, at 5:00 p.m. Active and
alternate Directors are encouraged to attend, as well as all council members.
Patrick Miles, Director of Information Technology, then recognized Howard Lembke who retired
after 39 years with the District.
REPORT OF THE GENERAL MANAGER
Blake Anderson, General Manager, announced the District will receive a $1 million federal
allocation earmarked for this fiscal year towards secondary treatment. The Legislative Ad Hoc
Committee, along with staff, have been working towards this for the past year, and will look to
receive a$10 million allocation towards secondary treatment next year.
He then announced that July 1, 2004 will be the District's 501" anniversary. At the monthly
board meetings until the anniversary date milestones of each of the first five decades will be
noted. The Board Chair photo gallery was then unveiled in the Board Room, depicting the 32
men and women who have served as Chairs of the Sanitation District. Vice Chair Anderson
thanked Director Eckenrode for his idea and development of this project, along with Ingrid
Hellebrand of Communications who helped to finalize the project.
Minutes for Board Meeting u
Page 4 0
01/28/04
REPORT OF THE GENERAL COUNSEL
Mr. Nixon announced that in regard to the Crow-Winthrop Litigation, a petition for review has been
filed seeking relief from the California Supreme Court. A decision to review this case should be
made by the Supreme Court within 90 days.
Mr. Nixon also announced that in the matter of Woodside litigation, the City of Placentia has been
dismissed.
APPROVAL OF MINUTES
The Chair ordered that the minutes of the regular meeting held December 17, 2003, be deemed
approved, as written.
Directors Patricia Bortle, Patty Campbell, Cathy Green, Tod Ridgeway and Jim Silva abstained.
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits"A"
and "B", attached hereto and made a part of these minutes.
ALL DISTRICTS 12/15/03 12/31/03
Totals $7,785,279.15 $14,617,931.91
Directors Eckenrode abstained. Director Cavecche abstained from discussion and voting on
Warrant No. 58581. Director Davert abstained from discussion and voting on Warrant Nos.
57921, 58199 and 58218. Abstentions were pursuant to California Government Code Section
84308.
CONSENT CALENDAR
9. a. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. OCSD
04-01, Appointing a Secretary Pro Tern to the Board of Directors, and Repealing
Resolution No. OCSD 03-01.
b. MOVED, SECONDED AND DULY CARRIED: (1) Receive and file petition from
Richard Dittberner requesting annexation of 0.55 acres to Orange County
Sanitation District(OCSD), in the vicinity of Via Vista and Cooks Corner, in an
unincorporated area of Orange County; and,
(2) Adopt Resolution No. OCSD 04-02, authorizing initiation of proceedings to
annex said territory to OCSD (Proposed Annexation No. OCSD-38—Dittberner
Annexation).
C. Item removed by staff.
d. General Counsel requested that the motion be amended as follows:
Minutes for Board Meeting
Page 5
01/28/04
MOVED, SECONDED AND DULY CARRIED: Approve Amendment No. 3 to the
Professional Services Agreement with ADS Environmental Services for Long
Term Flow Monitoring Program, Job No. J-73-2, regarding the acceptance of a
new insurance carrier for Errors and Omissions insurance coverage, with no
change to the total contract amount not to exceed $6,337,400.
COMMITTEE REPORTS AND RECOMMENDED ACTIONS
11. DRAFT STEERING COMMITTEE: A verbal report was presented by Director Anderson,
Vice Chair of the Steering Committee, re the January 28, 2004 meeting.
Vice Chair Anderson reported that several members of the Steering Committee attended
the CASA conference in Palm Springs earlier that month and gave verbal reports. The
General Manager updated the Directors on the following:
a) In-county biosolids management options;
b) Miscellaneous committee housekeeping issues;
c) 50h anniversary celebration plans;
d) $1 million appropriation from EPA for secondary treatment and suggested strategy to
receive $10 million for the next year, and a total of$50 million over the next 10 years;
e) Ideas on how to better integrate the District's efforts with those of the County and the
Cities;
f) Status on SAWPA negotiations; and,
g) Update on negotiations with EPA on the terms and conditions of the ocean discharge
permit.
Additional items discussed by the Committee were NWRI Asset Management Blue
Ribbon Panel Report, the Regional Water Quality Control Board Order re Urban Runoff,
and the Biosolids Advisory Committee.
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order the Steering Committee Minutes
for the meeting held on December 17, 2003 to be filed.
Non-Consent Calendar
No items considered.
12. DRAFT URBAN RUNOFF AD HOC COMMITTEE: A verbal report was presented by
Director Bankhead, Chair of the Urban Runoff Ad Hoc Committee, re the January 14,
2004 meeting.
Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order draft Urban Runoff Ad Hoc
Committee Minutes for the meetings held on May 21, 2003, and January 14,
2004, to be filed.
Minutes for Board Meeting
Page 6
01/28/04
Non-Consent Calendar
b. MOVED, SECONDED AND DULY CARRIED: Approve a sole source Consultant
Services Agreement with CH2M Hill, Inc., to conduct an urban runoff study in an
amount not to exceed $223,123.
Director Alberta Christy opposed.
13. JOINT GROUNDWATER REPLENISHMENT SYSTEM COOPERATIVE COMMITTEE
(JCC): A verbal report was presented by Director Eckenrode, Vice Chair of the Joint
Groundwater Replenishment System Cooperative Committee, re the January 12, 2004
meeting. He also reported a groundbreaking ceremony would be held on February 19,
12-1:30, at the Arrowhead Pond, and invited all Directors to attend the event.
JCC Consent Calendar
a. MOVED, SECONDED AND DULY CARRIED: Order Joint Groundwater
Replenishment System Cooperative Committee Minutes for the meetings held on
November 10, 2003, and December 1, 2003 to be filed.
JCC Non-Consent Calendar
No items considered.
Non-Consent Calendar
14. MOVED, SECONDED AND DULY CARRIED: Receive and file Treasurer's Report for
the month of December 2003.
15. MOVED, SECONDED AND DULY CARRIED: Ratify use of General Manager's
emergency purchasing authority, Resolution No. OCSD 99-23, for Purchase Order No.
41835-OS issued to Dynamic Fabrication Inc. for$121,568.94, including tax and freight,
and a contingency of $3,341.06 for any unforeseen work that may be required to
complete the repair, for a total amount not to exceed $125,000.00, for the Emergency
Repair of the Plant 2 Truck Loading Station Auger System.
16. MOVED, SECONDED AND DULY CARRIED: (a) Establish a budget for Realignment of
Coast Highway Trunk Sewer, Contract No. 5-13-1, in the amount of $103,000 for the
reimbursement of Orange County Sanitation District's share of construction and staff
costs;
(b) Approve a reimbursement agreement with the City of Newport Beach for
Realignment of Coast Highway Trunk Sewer, Contract No. 5-13-1 near Jamboree Road
and Backbay Drive, in a form approved by General Counsel, for an estimated amount
not to exceed $80,000; and,
(c) Authorize the General Manager to execute quitclaim deeds, in a form approved by
General Counsel, to transfer the existing easement to the Irvine Company and the
Minutes for Board Meeting
Page 7
' 01/28/04
Orange County Public Facilities Resource Department, which upon project completion
will no longer be required.
17. MOVED, SECONDED AND DULY CARRIED: (a) Approve plans and specification
and Addenda Nos. 1, 2, and 3 for Peak Flow Management, Job No. J-67, on file at the
office of the Board Secretary;
(b) Receive and file bid tabulation and recommendation; and,
(c) Award a construction contract to Margate Construction, Inc. for Peak Flow
Management, Job No. J-67, for an amount not to exceed $1,250,900.
Director Davert abstained.
18. MOVED, SECONDED AND DULY CARRIED: (a) Approve Plans and Specifications and
Addenda Nos. 1 and 2 for Plant Utilities Rehabilitation and Refurbishment, Job No. P2-
82, on file at the office of the Board Secretary;
(b) Receive and file bid tabulation and recommendation; and,
(c) Award a construction contract to Norman A. Olsson Construction, Inc. for Plant
Utilities Rehabilitation and Refurbishment, Job No. P2-82, for an amount not to exceed
$2,778,985.
Director Davert abstained.
19. MOVED, SECONDED AND DULY CARRIED: (a) Approve plans and specifications for
Rehabilitation of Crystal Cove Pump Station, Contract No. 5-54, on file at the office of
the Board Secretary;
(b) Receive and file bid tabulation and recommendation; and,
(c) Award a construction contract to L.H. Engineering Co.for Rehabilitation of Crystal
Cove Pump Station, Contract No. 5-54, for an amount not to exceed $144,806.85.
20. MOVED, SECONDED AND DULY CARRIED: (a) Approve plans and specifications and
Addendum No. 1 for Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36;
Orange Trunk Improvements, Contract No. 7-39; Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41; and City of Tustin Project Nos. 6106 and 6151, on file
at the office of the Board Secretary;
(b) Receive and file bid tabulation and recommendation; and,
(c) Award a construction contract to ARB, Inc., for Gisler-Redhill Trunk Improvements,
Reach "A" Contract No. 7-36; Orange Trunk Improvements, Contract No. 7-39; Gisler-
Redhill/North Trunk Improvements, Contract No. 7-41; and City of Tustin Project
Nos. 6106 and 6151, for an amount not to exceed $18,375,999.
Minutes for Board Meeting
Page 8
01/28/04
21. Adam Problosky, representing the Revenue Enhancement Group, spoke to the Directors
regarding the proposal submitted for identifying undercharged commercial parcels, and
addressed concerns the Directors might have.
Director Brian Brady, Chair of the FAHR Committee, indicated the committee had no
consensus on this item and thus requested the item to go forward to the Board of
Directors for consideration.
Gary Streed, Director of Finance, had no changes or additional information to the staff
report provided to the Directors in the agenda package. He also suggested that if the
Directors desire to pursue investigating possible improperly charged parcels, that the
work should be sent out for a competitive bid process or be conducted in-house by staff.
Directors entered into lengthy discussion regarding setting policy for the number of years
to charge a parcel for incorrect user fees. General Counsel was requested to investigate
if not going back four years would be considered a gift of public funds. Mr. Nixon
suggested that a cost benefit analysis be conducted prior to determining how many
years to go back.
A motion was then moved and seconded to refer back to the FAHR Committee to:
(a) Reject the unsolicited proposal submitted by Revenue Enhancement Group, dated
November 2003, Identifying Undercharged Commercial Parcels; and, (b) Direct staff to
evaluate non-residential parcels to determine if those parcels have been undercharged
for annual sewer service user fees and, if so, to collect the proper charges on the
property tax bill on a going forward basis.
Following additional discussion, a substitute motion was moved and seconded to direct
staff to conduct a formal RFP process, compare the costs to complete the process in
house and return to the FAHR Committee with a recommendation. After lengthy
discussion, the substitute motion failed by a vote of 6 ayes and 17 noes.
The original motion was then voted upon:
MOVED, SECONDED AND DULY CARRIED: To refer back to the FAHR Committee,
and to:
(a) Reject the unsolicited proposal submitted by Revenue Enhancement Group, dated
November 2003, Identifying Undercharged Commercial Parcels; and,
(b) Direct staff to evaluate non-residential parcels to determine if those parcels have
been undercharged for annual sewer service user fees and, if so, to collect the proper
charges on the property tax bill on a going forward basis.
Directors Don Bankhead and John Collins opposed.
22. Adopt Ordinance No. OCSD-21, An Ordinance of the Board of Directors of Orange
County Sanitation District, Adopting Fees, Procedures and Policies Concerning
Annexations of Territory to the District; and Repealing Ordinance No. OCSD-03:
Minutes for Board Meeting
Page 9
01/28/04
a. OPEN HEARING: The Vice Chair declared the hearing opened at 9:06 p.m.
Gary Streed, Director of Finance, provided a brief verbal report on the proposed
ordinance.
b. CLOSE HEARING: The Vice Chair declared the hearing closed at 9:07 p.m.
C. There was no discussion by the Board of Directors.
d. 1. MOVED, SECONDED AND DULY CARRIED: Read Ordinance
No. OCSD-21 by title only and waive reading of said entire ordinance.
2. MOVED, SECONDED AND DULY CARRIED: Adopt Ordinance
No. OCSD-21, An Ordinance of the Board of Directors of Orange County
Sanitation District, Adopting Fees, Procedures and Policies Concerning
Annexations of Territory to the District; and Repealing Ordinance
No. OCS D-03.
23. Adopt Ordinance No. OCSD-22, An Ordinance of the Board of Directors of Orange
County Sanitation District, Reaffirming Sanitary Sewer Service Charges; Adopting
Revised Capital Facilities Capacity Charges; Adopting Revised Miscellaneous Charges
and Fees Relating to Industrial Dischargers, Source Control Permittees and
Wastehaulers; and repealing Ordinance No. OCSD-20:
a. OPEN HEARING: The Vice Chair declared the hearing opened at 9:08 p.m.
Gary Streed, Director of Finance, provided a brief verbal report on the proposed
ordinance.
b. CLOSE HEARING: The Vice Chair declared the hearing closed at 9:10 p.m.
C. There was no discussion by the Board of Directors.
d. 1. MOVED, SECONDED AND DULY CARRIED: Read Ordinance
No. OCSD-22 by title only and waive reading of said entire ordinance.
2. MOVED, SECONDED AND DULY CARRIED: Adopt Ordinance
No. OCSD-22, An Ordinance of the Board of Directors of Orange County
Sanitation District, Reaffirming Sanitary Sewer Service Charges; Adopting
Revised Capital Facilities Capacity Charges; Adopting Revised
Miscellaneous Charges and Fees Relating to Industrial Dischargers,
Source Control Permittees and Wastehaulers; and repealing Ordinance
No. OCSD-20.
Director Alberta Christy opposed.
24. There was no closed session.
Minutes for Board Meeting
Page 10 0
01/28104
ADJOURNMENT: The Chair declared the meeting adjourned at 9:13 p.m.
Secretary o he Board of irectors of
Orange Co my SanitatipfiDistrict
H:\dept\agenda\Board Minutes\2004 Board Minutes\012804 minutes.doc
Claims Paid From 12101/03 to 12/16/03
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
57905 ADS Environmental Services, Inc. $ 66,261.10 Professional Services J-73-2
57905 Brown&Caldwell 153,936.05 Professional Services P1-37 and CMOM/WDR
579C6 Carollo Engineers 74,863.51 Professional Services J-25-4
57907 City of Seal Beach 74,571.35 Cooperative Projects
57908 CH2M Hill 33,348.49 Professional Services J-40-6
57909 Dell Direct Sales 39,226.28 (2)1750 Servers&(10)Printers
57910 Kemiron Pacific, Inc. 126,758.09 Ferric Chloride MO 9-27-95
57911 Parsons, Inc. 159,275,54 Engineering Services J-42
57912 Pioneer Americas, Inc. 88,643.17 Sodium Hypochlorite
57913 Sancon Engineering, Inc. 170,650.00 Construction-Manhole Rehabilitation Program
57914 SWRCB Accounting Office 41,420.00 NPDES Permit Fee
57915 Tule Ranch/Magan Farms 212,059.91 Residuals Removal MO 3-29-95
57916 U.S. Metro Group, Inc. 26,235.00 Janitorial&Floor Maintenance at Plants 1 &2
57917 U.S. Peroxide 48,149.27 Hydrogen Peroxide
57918 Union Bank of California 45,909.10 Construction 1-2-4, Retention
57919 UBS Financial Services, Inc. 30,149.69 Remarketing Fee- 1992 Series Advanced Refunding COPs
57920 ARB, Inc. 284,796.42 Construction 11-22
57921 J F Shea Construction, Inc. 56,423.32 Construction J-71-3
57922 Ken Thompson, Inc. 111,870.00 Construction 5-56
57923 Steve P Rados, Inc. 413,181.90 Construction 1-2-4
57924 A Tint of Glass 150.00 Window Tinting
57925 Adult Day Care Services of O.C. 307.09 Banners-Community Outreach for Bushard Trunkline Project
57926 Airborne Express 88.49 Air Freight
57927 Airgas-West 45.26 Demurrage
57928 Airgas Safety, Inc. 1,003.91 Safety Supplies
57929 Alta-Robbins, Inc. 377.74 Instrument Supplies
57930 American Training Resources, Inc. 537.31 Safety Videos
57931 Arch Wireless 1,616.17 Airtime, Service&Equipment
57932 Archie Ivy, Inc. 3,800.00 Construction-Installation of(2)Speed Humps&Striping
57933 Atlantis Pool Care 500.00 Service Agreement-Admin.Bldg.Atrium
57934 ASAP Software Express 842.84 Software Maintenance
57935 AT&T Wireless Services 4,027.90 Wreless Phone Services
57936 AT&T Wireless Services 3,094.27 Wireless Phone Services-Flow Meters J-73-2
57937 Baker Tanks 1,206.77 Tank Rentals
57938 Barrett Engineered Pumps 436.37 Pump
57939 Battery Specialties 444.62 Batteries
57940 Black&Veatch Corporation 13,271.47 Engineering Services J-87
57941 Brenton Safety, Inc. 6,727.82 Electrical Safety Equipment
57942 Bush&Associates, Inc. 1,964.00 Surveying Services MO 6-25-97
57943 California Auto Collision 5,984.39 Vehicle Repairs-V-455
57944 Callan Associates, Inc. 3,550.00 Investment Advisor
57945 Ce112Cell 57.48 Phones&Accessories
57946 Clean Street, Inc. 350.00 Street Sweeping Services
57947 Clickguard Corporation 659.00 Printer Service Agreement
fin/21011c EXHIBIT A
H:kleptlfinlEXCEL.dta12201APSHARE1Claims Paid Report102-03\Claims Paid Report-121503.)ds Page 1 of 7 1/13/2004
Claims Paid From 12/01/03 to 12/15/03
Warrant No. Vendor Amount Descrip0on
57948 Coast Fire Equipment 1,089.46 Fire Extinguishers, Inspection&Servicing
57949 Columbia Analytical Services, Inc. 850.00 Analysis of Wastewater, Industrial Wastewater&Biosolids
57950 Communications Performance Group,Inc. 12.500.00 Prof. Services-Additions& Revisions to IERP-Volume 2
57951 CompuMaster 2,725.00 On-Site Training-Outlook
57952 Consolidated Elect. Distributors 3,207.32 Electrical Supplies
57953 Consumers Pipe&Supply Co. 221.03 Plumbing Supplies
57954 Cooper Cameron Corporation 216.51 Engine Supplies
57955 Cooper Energy Services 4.13 Freight
57956 Corporate Express 1,849.53 Office Supplies
57957 Corporate Image Maintenance,Inc. 155.00 Custodial Services Spec. No. 9899-09
57958 Cortech Engineering 13,961.67 Mechanical Parts&Supplies
57959 County of Orange-Auditor Controller 367.32 Maint.Agreement-Repair/Installation of Base,Handheld&Vehicle Radios
57960 County Wholesale Electric Co. 148.24 Electrical Parts&Supplies
57961 Crane Veyor Corp. 1,686.28 Repairs&Maintenance-Power Cord Reel Assembly
57962 Cytec Industries, Inc. 18,376.37 Chemicals/Solutions
57963 CASA 375.00 Technical Services Meeting Registration
57964 CGvL Engineers 911.00 Engineering Services P2-82
57965 CGvL Engineers 17,215.22 Engineering Services P1-94
57966 CMAA 360.00 Membership-Construction Management Association of America
57967 CPI International 1,221.25 Lab Supplies
57968 CSMFO 35.00 CAFR Award Application Fee for Year Ended 6/30/03
57969 CWEA Membership 291.00 Membership-Calif.Water Environment Assoc.
57970 David's Tree Service 3,525.00 Tree Maint.Service
57971 Del Mar Analytical 3,776.00 Analysis of Biosolids and Wastewater
57972 Diamond H Recognition 100.66 Employee Service Awards
57973 Douglass Truck Bodies, Inc. 323.25 Towing/Transporting Fees
57974 Dunn-Edwards Corporation 418.21 Paint Supplies
57975 E.Sam Jones Distributors, Inc. 605.16 Electrical Supplies
57976 Ecology Control Industries 17,027.32 Hazardous Waste Disposal
57977 Employee Benefits Specialists, Inc. 653.10 Reimbursed Prepaid Employee Medical&Dependent Care
57978 Enchanter, Inc. 3,600.00 Ocean Monitoring&Outfall Inspection&Maintenance
57979 Environmental Resource Association 1,432.90 Lab Parts&Supplies
57980 Ferguson Enterprises, Inc.#677 3,144.13 Mechanical Parts&Supplies
57981 First American Real Estate Solutions 647.50 Orange County Property Information
57982 Fisher Scientific 5,411.41 Lab Supplies
57983 Flo-Systems,Inc. 33.20 Pump Supplies
57984 Fluor Enterprises,Inc. 6,825.67 Engineering Services J-84
57985 Foodcraft Coffee&Refreshment Services 563.10 Meeting Supplies
57986 Full Spectrum Analytics 4,239.80 Instrument Repairs&Service
57987 City of Fullerton 271.99 Water Use
57988 Garratt-Callahan Company 70.00 Chemicals
57989 Gierlich-Mitchell, Inc. 3,575.88 Belt Filter Press Supplies
57990 Goldenwest Window Service 2,547.00 Window Cleaning Service-Spec.#990015
57991 Grainger,Inc. 680.14 Electrical Parts&Supplies
57992 Graphic Distributors 1,939.50 Photographic Supplies
fin/210Ac EXHIBIT A _
H:Wept\fm\EXCEL.dta\220\APSHARE\Claims Paid Report102-031Claims Paid Report-121503.As Page 2 of 7 1/13/2pp4
Claims Paid From 12/01103 to 12/16103
Warrant No. Vendor Amount Description
57993 Guarantee Records Management 285.95 Off-Site Records Storage
57994 Hach c/o Ponton Industries 1,430.80 Lab Parts,Supplies&Batteries
57995 Hagemeyer North America 5,820.29 Prescription Safety Glasses
57996 Harold Primrose Ice 55.50 Ice For Samples
57997 Hill Brothers 20,639.26 Chemicals-Odor&Corrosion Control-Newport Trunkline
57998 Home Depot 901.91 Misc.Repair&Maintenance Material
57999 Industrial Distribution Group 1,917.13 Mechanical Parts, Supplies,Tools&Oil
58000 Industrial Metal Supply 70.01 Metal
58001 Innerline Engineering 740.00 CCTV Videoing of Trunkline Sewers
58002 Innovative Net Systems 2.050.00 Trawl Nets
58003 Intratek Computer, Inc. 540.00 Network&Server Maintenance
58004 Iron Mountain Off-Site Data Protection 234.00 Offsite Back-Up Tape Storage for NT Server
58005 J&B Auto Parts 35.49 Automotive Supplies
58006 J R Filanc Construction 11,655.47 Construction-Repair Sludge Line at Plant 2
58007 Kforce,Inc. 15,167.83 Temporary Employment Services
58008 Kings County Tax Collector 11,395.20 Property Taxes
58009 Lab Safety Supply, Inc. 59.55 Publication
58010 Lee&Ro, Inc. 6,375.00 Professional Services P1-93
58011 Lucci's Gourmet Foods, Inc. 411.43 Meeting Expense
58012 LINJER 4,730.00 Professional Service-DART MO 9-22-99
58013 Malcolm Pirnie, Inc. 12,818.08 Engineering Services J-79
58014 Marden Susco, Inc. 2,138.84 Plumbing Supplies
58015 MassMutual Michel Financial Group 2,530.06 Executive Disability Plan Premium
58016 McKenna Engineering&Equipment Co., Inc. 276.00 Filters
58017 McMaster-Carr Supply Co. 83.92 Mechanical Parts&Supplies
58018 Mechanical Seal Repair, Inc. 681.46 Repairs&Maintenance Services
58019 Medlin Controls Co. 139.47 Instrument Parts&Supplies
58020 Megger 1,568.12 Software
58021 Midway Mfg&Machining Co. 5,247.64 Repairs&Maintenance Services
58022 Mission Uniform Service 2,096.80 Uniform Rentals
58023 Moody's Investor's Service 5,000.00 1993 Certificates of Participation Maintenance Fees
58024 MARMAC Field Services, Inc. 5,070.00 Professional Services P1-92
58025 National Plant Services,Inc. 440.00 Vacuum Truck Services
58026 Neal Supply Co. 750.80 Plumbing Supplies
58027 City of Newport Beach 8.66 Water Use
58028 Nickey Petroleum Co.,Inc. 1,514.89 Industrial Turbine Oil
58029 Ninyo&Moore Corporate Accounting 5,755.32 Professional Services-Materials Testing, Inspection&Geotechnical Engrg.
58030 The Norco Companies 170.78 Mail Delivery Service
58031 Nu-Way Laser Engraving 919.95 Steel Tags
58032 Office Depot Business Services Div. 606.75 Office Supplies
58033 OneSource Distributors, Inc. 84.05 Electrical Parts&Supplies
58034 Orange Fluid System Technologies, Inc. 181.16 Plumbing Parts&Supplies
58035 Oxygen Service Company 1,186.08 Specialty Gases
58036 OCB Reprographics 3,573.07 Printing Service-MO 1/26/00
58037 Pacific Mechanical Supply 170.68 Plumbing Supplies
fin/210nc EXHIBIT A
H:\depttin%EXCEL.dta1220WPSHARE\Cla[ms Paid Report\02-0 Claims Paid Report-121503AS Page 3 of 7 1/13/2004
Claims Paid From 12/01/03 to 12/15103
Warrant No. Vendor Amount Description
58038 Parker Supply Company 987.37 Mechanical Seal
58039 PenValve 279.99 Plumbing Parts&Supplies
58040 Pixelpushers, Inc. 6,050.00 Prof.Serv.-Design, Implement,Construct&Install a Corporate Intranet Site
58041 Power Electro Supply Co., Inc. 30.78 Electrical Supplies
58042 Power Measurement USA, Inc. 1.051.64 Computer Hardware/Software
58043 PrinterGuy 583.57 Printer Maintenance
58044 Progressive Business Publications 299.00 Subscription
58045 Project Management Institute 50.90 Publication
58046 Protech Petroleum Services, Inc. 1,840.00 Professional Services-Testing of(2)Tank Systems at Blower Bldg.
58047 Pryco, Inc. 1,737.50 Computer Hardware/Software
58048 PCS Express,Inc. 553.63 Courier Service
58049 PRIMA: Public Risk Management Assoc. 310.00 Membership
58050 PVF Sales, Inc. 476.41 Plumbing Parts&Supplies
58051 R.L.Abbott&Associates 3,000.00 Kern County Biosolids Consulting Services
58052 Rainin Instrument,L.L.C. 190.67 Lab Parts&Supplies
58053 Reliastar Bankers Security Life Ins. 9,925.22 Employee Life Ins. Premium, Short-Term Disability&Cancer Ins. Payroll Deductions
58054 Rossmoor/Los Alamitos Area Sewer Dist. 17,558.33 Cooperative Projects
58055 RJN Group, Inc. 697.50 Tax on CMMS Consulting Services Contract for Period 7/1/03-7/1/04
58056 RPM Electric Motors 1,778.13 Electrical Parts&Supplies
58057 Science Applications Intl.,Corp. 19,244.42 Professional Services Ocean Monitoring,P-179,P-185&Buoy Deployment
58058 Shamrock Supply Co., Inc. 259.69 Tools
58059 Shred-It,Los Angeles 840.00 Records Destruction Services
58060 Shureluck Sales&Engineering 378.70 Mechanical Parts&Supplies
58061 Siemens Building Technologies 1,186.00 Professional Services-Admin. Bldg.Automation System Troubleshooting
58062 Sigma-Aldrich, Inc. 143.72 Lab Supplies
58063 Smith Pipe&Supply 98.76 Mechanical Parts&Supplies
58064 Smith-Emery Company 4,870.00 Soils,Concrete&Other Materials Testing
58065 South Coast Systems, Inc. 260.00 Instrument Supplies
58066 Specialized Environmental, Inc. 7,588.00 Construction-Removal&Disposal of Flooring Materials
58067 Spex Certiprep, Inc. 784.58 Lab Parts&Supplies
58068 Steven Enterprises, Inc. 107.83 Stationery&Office Supplies
58069 Sunset Industrial Parts 38.33 Mechanical Supplies
58070 Super Chem Corporation 487.63 Chemicals
58071 Synegi, Inc. 14,023.19 Software
58072 SARBS-CWEA 45.00 Membership-California Water Environment Assoc.
58073 SETAC 110.00 O&M Training Registration
58074 SPEC Services, Inc. 16,846.20 Engineering Services J-33-1
58075 Tekdraulics, Inc. 1,451.61 Mechanical Supplies
58076 Teledyne Electronic Tech. 175.81 Instrument Parts&Supplies
58077 Terminix International 175.00 Pest Control
58078 The Walking Man,Inc. 350.00 Construction Notice Distribution-Bushard Trunk Sewer Replacement
58079 Thomas Gray&Assoc. 333.91 Biosolids Analysis
58080 Thompson Industrial Supply, Inc. 2,604.02 Mechanical Supplies
58081 ThyssenKrupp Elevator Corporation 4,752.00 Elevator Maintenance
58082 Time Warner Communication 40.47 Cable Services
fin/21011c EXHIBIT A
H:\dept\fin\EXCEL.dta\220\APSHARE\Claims Paid Report\02-03\Claims Paid Report-121503.)ds Page 4 of 7 1/1UM&
e
Claims Paid From 12/01103 to 12115103
Warrant No. Vendor Amount Description
58083 Tony's Lock&Safe Service&Sales 151.53 Locks&Keys
58084 Townsend Public Affairs 5,000.00 Legislative&Executive Advocate for Grant Funding
58085 Southern California Trane Service 18,134.00 Replacement of(2)25-Ton Roof-Packaged A/Cs at Plt. 1 Power Bldg.3-A
58086 Tropical Plaza Nursery, Inc. 9,771.91 Contract Groundskeeping MO 5-11-94
58087 Truck&Auto Supply, Inc. 39.02 Automotive Supplies
58088 TEKsystems 19,934.00 Temporary Employment Services
58089 Ultra Scientific 29.31 Lab Supplies
58090 The Unisource Corporation 168.74 Stationery&Office Supplies
58091 United Parcel Service 1,594.13 Parcel Services
58092 Update International, Inc. 6,966.66 On-Site Training-Machinery Improvement Skills
58093 US Filter Westates Carbon 5,015.05 Carbon Filters
58094 Vapex,Inc. 10,503.38 Instrument Parts&Supplies
58095 Varian, Inc. 3,935.10 Lab Parts&Supplies
58096 Verizon California 315.78 Telephone Services
58097 Vortex Corp. 421.30 Door Repairs at Human Resources Building
58098 VWR Scientific Products 3,500.11 Lab Supplies
58099 The Wackenhut Corporation 12,480.21 Security Guards
58100 The Wall Street Journal 343.72 Subscription
58101 Waste Markets 13,969.19 Maint.Agreement-Grit&Screenings Removal&Digester Bed Matti. Removal
58102 Western City 63.00 Subscription
58103 Wilson Supply, Inc. 1,401.59 Mechanical Parts&Supplies
58104 Xerox Corporation 4,673.91 Fax&Copier Leases
58105 Ricardo A.Gallegos 95.00 Meeting/Training Expense Reimbursement
58106 W.Doug Hauser 190.00 Meeting/Training Expense Reimbursement
58107 Mike J. Herrera 130.75 Meeting/Training Expense Reimbursement
58108 John Mirkovich 46.00 Meeting/Training Expense Reimbursement
58109 Michael D.Moore 109.81 Meeting/Training Expense Reimbursement
58110 Kimberly J.Tolsma 100.00 Meeting/Training Expense Reimbursement
58111 Jane H.Tran 713.66 Meeting/Training Expense Reimbursement
58112 Tadeo G.Vtko 856.00 Meeting/Training Expense Reimbursement
58113 Ater,Marie 650.18 Reconciliation User Fee Refund Program
58114 Cole, Lloyd 256.86 Reconciliation User Fee Refund Program
58115 County of Orange-Auditor Controller 600.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
58116 County of Orange-Auditor Controller 975.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
58117 County of Orange-Auditor Controller 255.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
58118 Deckard,Jill 1,247.76 Reconciliation User Fee Refund Program
58119 Keife, Patrick 256.86 Reconciliation User Fee Refund Program
58120 Kim Royster&Thomas Tucker 88.77 Reconciliation User Fee Refund Program
58121 Law,James 66.09 Reconciliation User Fee Refund Program
58122 McCarthy,Mary 492.61 Reconciliation User Fee Refund Program
58123 Moreno, Roland 1.318.23 Reconciliation User Fee Refund Program
58124 Nobles, Frank 2,220.14 Reconciliation User Fee Refund Program
58125 Orange County Sanitation District 2,192.71 Petty Cash Reimb.
58126 Shigekawa,William 256.86 Reconciliation User Fee Refund Program
58127 Smith, Greg 256.86 Reconciliation User Fee Refund Program
fn/210nc EXHIBIT A
H:%deptVinlEXCEL.dta12201APSHARE1Claims Paid Report102-031Claims Paid Report-121503.)ds Page 5 of 7 1/1312004
Claims Paid From 12/01/03 to 12/15/03
Warrant No. Vendor Amount Description
58128 Coral Energy Resources, L.P. 259,389.66 Natural Gas
58129 Municipal Water Dist.of Orange County 35,343.00 Water Use Efficiency Program MO 9-22-99
58130 Oracle Corp 34,788.74 Computer Maintenance&Software Updates
58131 Orange County Sanitation District 1,550,136.28 Payroll EFT Reimbursement
58132 Southern California Edison 72,486.42 Power
58133 Ken Thompson, Inc. 25,735.00 Construction 5-56
58134 Airborne Express 94.80 Air Freight
58135 Airgas Safety, Inc. 1,791.58 Safety Supplies&Equipment
58136 American Fildelity Assurance Company 132.00 Employee Cancer Insurance
58137 American Red Cross 1,257.00 CPR Training&Miscellaneous Supplies
58138 American Telephone&Telegraph Corp. 132.62 Telephone Service
58139 Court Order 150.00 Wage Garnishment
58140 Compressor Components Of California 1,248.00 Coil Cleaning&Testing&Compressor Parts
58141 Consolidated Elect. Distributors, Inc. 1,424.05 Electrical Supplies
58142 Consumers Pipe&Supply Co. 1,408.18 Plumbing Supplies
58143 Court Trustee 69.12 Wage Garnishment
58144 CWEA Membership 97.00 Membership-Calif.Water Environment Assoc.
58145 Employee Benefits Specialists, Inc. 7,868.20 Reimbursed Prepaid Employee Medical&Dependent Care
58146 Court Order 445.00 Wage Garnishment
58147 Franchise Tax Board 436.69 Wage Garnishment
58148 Government Finance Officers Association 480.00 CAFR Award Application Fee for Year Ended 6/30/03
58149 Graybar Electric Company 60.83 Electrical Parts&Supplies
58150 Industrial Metal Supply 2,851.06 Metal
58151 Industrial Threaded Products, Inc. 194.62 Mechanical Parts&Supplies
58152 Internal Revenue Service 450.00 Wage Garnishment
58153 Intl. Union of Oper. Eng.AFL-CIO Local 501 3,732.78 Dues Deduction
58154 Jobs Available, Inc. 99.00 Notices&Ads
58155 McMaster-Carr Supply Co. 1,338.29 Mechanical Parts&Supplies
58156 National Bond&Trust 2,072.37 U.S. Savings Bonds Payroll Deductions
58157 NetIQ Corporation 359.82 Software Maintenance
58158 Orange Fluid System Technologies, Inc. 60.85 Lab Parts&Supplies
58159 OCEA 570.86 Dues Deduction
58160 Court Order 40.00 Wage Garnishment
58161 Court Order 296.00 Wage Garnishment
58162 Peace Officers Council of CA 1,602.00 Dues Deduction
58163 PenValve 198.43 Mechanical Parts&Supplies
58164 PinnacleOne Institute 5,672.18 Professional Services J-33-1A
58165 Pyramid Screening Technology 4,499.00 Notices and Ads
58166 Safety Design, Inc. 4,982.50 LOTO Panel Devices-Safety
58167 Shureluck Sales&Engineering 115.07 Mechanical Parts&Supplies
58168 Smith-Emery Company 4,234.00 Soils,Concrete&Other Materials Testing
58169 Court Order 721.50 Wage Garnishment
58170 South Coast Air Quality Management Dist, 1,116.48 Annual Waste Discharge Requirement Fee
58171 State Water Resources Control Board 5,668.00 Annual NPDES Permit Fee
58172 Summit Steel 1,367.60 Metal
kn/210Ac EXHIBIT A
H:WepiUnIEXCEL.dta12201APSHARE1Claims Paid Report102-031Claims Paid Report-121503.)ds Page 6 of 7 1/13/2004
Claims Paid From 12/01/03 to 12/15/03
Warrant No. Vendor Amount Description
58173 SBC 20.95 Telephone Services
58174 Thompson Industrial Supply, Inc. 1,260.49 Mechanical Supplies
58175 The Unisource Corporation 7,030.26 Stationer&Office Supplies
58176 United Parcel Service 46.53 Parcel Services
58177 United Way 305.00 Employee Contributions
58178 Verizon California 786.52 Telephone Services
58179 3CMA-City-County Communications 105.00 Communications Training Registration
58180 Nicholas J.Arhontes 3,434.00 Meeting/Training Expense Reimbursement
58181 David A. Bihl 130.00 Meeting/Training Expense Reimbursement
58182 Michael J. Boess 170.00 Meeting/Training Expense Reimbursement
58183 Deirdre E. Hunter 196.13 Meeting/Training Expense Reimbursement
58184 Jeffrey T. Reed 1,437.86 Meeting/Training Expense Reimbursement
58185 CMTA 2003 Conference 46.00 Accounting Training Registration
58186 Local Agency Formation Commission 1,150.00 Annexation Fees
58187 Local Agency Formation Commission 1,150.00 Annexation Fees
58188 Oved Dagan Construction Co. 179,714.90 Construction J-90
58189 Nextel Communications 4,053.27 Cellular Phones&Air Time
58190 County of Orange-Auditor Controller 312.00 Underground Storage Tank,Hazardous Material,&State Fees
Total Accounts Payable-Warrants $ 5,080,423.53
Payroll Disbursements
31884-32060 Employee Paychecks $ 371,616.04 Annual Payouts&Timesheet Correction
32061 -32157 Employee Paychecks 26,041.74 Adjustment to Annual Payouts&OCERS Reimbursements
32158-32266 Employee Paychecks 162,223.65 Biweekly Payroll 12/10/03
32267-32601 Employee Paychecks 947,948.25 Retroactive Salary Adjustments
32602-32603 Employee Paychecks 1,272.32 Annual Payout Adjustment&Retroactive Salary Adjustment
92538-93055 Direct Deposit Statements 961,897.31 Biweekly Payroll 12/10/03
Total Payroll Disbursements $ 2,470,999.31
Wire Transfer Payments
JP Morgan Chase Bank $ 127,220.54 Societe Generale November Swap Payment on 1993 Certificates of Participation
JP Morgan Chase Bank 34,150.35 November Interest Payment on 1993 Certificates of Participation
Lloyds TSB Bank plc 72,485.42 Letter of Credit Fee for 1992 Refunding COPS(08/01/03-11/01/03)
Total Wre Transfer Payments $ 233,856.31
Total Claims Paid 12/01/03-12115/03 $ 7,785,279.15
W210Ac EXHIBIT A
H:\dept\fin\EXCEL.dta\220%APSHARE\Claims Paid Report\02-0310aims Paid Report-121503.)ds Page 7 of 7 1/13/2004
Claims Paid From 12/16/03 to 12131103
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
58191 Aanderaa Instruments $ 107,492.50 Coastal Physical Oceanographic Mooring
58192 Aquatic Bioassay And Consulting Labs,Inc. 34.470.00 Toxicity Testing
58193 Basic Chemical Solutions, L.L.C. 37.525.27 Sodium Bisulfile
58194 Blue Cross of California 323.860.46 Medical Insurance Premium
58195 Carollo Engineers 793,558.50 Prof.Svrs.P2-66,Coordinated Commercial Enterprise Proj.&Microfiltration Demo. Proj.
58196 Delta Dental 56.122.77 Dental Insurance Plan
58197 E.I.Du Pont De Nemours and Company 104,342.00 Painting Maint.Services MO 4-22-98
58198 Entech Instruments,Inc. 73,370.87 Lab Parts&Supplies
58199 J F Shea Construction,Inc. 374,414.74 Construction P2-85
58200 Jamison Engineering Contractors,Inc. 73.831.20 Spill Clean-Up,SARI Access Road Maint.,Manhole Reh.&Foster Outfall Leak Repair
58201 Kaiser Foundation Health Plan 51.727.96 Medical Insurance Premium
58202 Kemiron Pacific,Inc. 161,973.97 Ferric Chloride MO 9-27-95
58203 Kforce,Inc. 36,995.39 Temporary Employment Services
58204 Lee&Ro,Inc. 87,678.54 Professional Services 5-50,5-51 &5-52
58205 Malcolm Pirnie,Inc. 42,570.41 Professional Services 1-10
58206 Orange County Water District 1,227,649.87 Joint GWRS Project J-36
58207 Pioneer Americas,Inc. 362,774.90 Sodium Hypochlorite
58208 Polydyne,Inc. 97.517.73 Cationic Polymer MO 3-11-92
58209 Science Applications Intl.,Corp. 26,351.57 Ocean Monitoring MO 6-8-94
58210 So.Cal.Gas Company 25,570.99 Natural Gas
58211 State Water Resources Control Board 128,500.00 Annual NPDES Permit Fee
58212 Synagro Technologies,Inc. 377,694.50 Residuals Removal MO 3-29-95
58213 SPEC Services,Inc. 44,975.38 Engineering Services J-33-1 &P1-89
58214 Tranter PHE,Inc. 25,018.66 Repairs&Maintenance Services to Heat Exchanger
58215 U.S.Peroxide,L.L.C. 152,712.10 Hydrogen Peroxide&Ferrous Chloride
58216 Valverde Construction,Inc. 32,005.00 Construction-Street Repairs at Various Locations
58217 Walden&Associates 27,019.37 Professional Services-Big Canyon Trunk Sewer
58218 J F Shea Construction, Inc. 728,738.77 Construction J-71-3,J-87&J-35-2
58219 Margate Construction,Inc. 1,332,699.00 Construction P1-37
58220 Southern Contracting Company 25,999.00 Construction J-33-IA
58221 Steve P Rados,Inc. 763,608.22 Construction 1-2-4
58222 Union Bank of California 85,473.40 Construction 1-2-4,Retention
58223 Orange County Sanitation District 40,999.40 Worker's Comp.Reimb.
58224 Aero Compressor,Inc. 884.33 Air Compressor Filter
58225 Air Duct Cleaning Company 985.00 Air Duct Cleaning Services
58226 Air Liquide America Corp. 419.74 Specialty Gases
58227 Airco Filter Service 730.17 Natural Gas Filters
58228 Airgas-West 6.60 Demurrage
58229 Airgas Safety,Inc. 2,130.99 Safety Supplies
58230 American Chemical Society 261.00 Membership
58231 American Industrial Hygiene Association 180.00 Membership
58232 American Society For Microbiology 258.00 Membership
58233 American Training Resources,Inc. 537.31 Safety Videos
58234 Gerardo Amezcua 190.00 Meeting/Training Expense Reimbursement
58235 Analysts,Inc. 1,961.21 Testing Kits
58236 Appleone Employment Service 4,126.86 Temporary Employment Services
58237 Aquarium Doctor 97.90 Human Resources Aquarium Service
H:\deptlrinlEXCEL.dta1220VAPSHAREIClaims Paid Report102-031CIaims Paid Report-123103.)ds EXHIBIT B
fin1210Ac Page 1 of 13 1/19/2004
Claims Paid From 12116/03 to 12131103
Warrant No. Vendor Amount Description
58238 Arch Wireless 1.577.73 Airtime,Service&Equipment
58239 Arizona Instrument 641.00 Instrument Repairs&Calibration
58240 Ashbrook Corporation 520.60 Mechanical Parts&Supplies
58241 Association of Energy Engineers 160.00 Membership
58242 AAAS 130.00 Membership-American Assoc.for the Advancement of Science
58243 ACS Hydraulics,Inc. 1,255.60 Mechanical Repair&Maintenance Services
58244 APCO 210.00 FCC License Fee-Operational Radio System
58245 AT&T Universal Biller 15,961.05 Telephone Service
58246 American Telephone&Telegraph Corp. 51.00 Telephone Service
58247 AT&T Wireless-TITAN 775.08 Cell Phones&Accessories
58248 AWSI 1,357.50 Department of Transportation Training Program
58249 Baker Tanks 3,689.70 Tank Rentals
58250 Bar Tech Telecom,Inc. 2,153.13 Telephone Equipment
58251 Barrett Engineered Pumps 437.54 Pump Supplies
58252 Basler Electric Company,Department 590 1.939.44 Electrical Supplies
58253 Beckman Instruments,Inc. 3,219.00 Instrument Repairs&Maintenance Services
58254 BioMerieux Vitek,Inc. 1,088.32 Lab Supplies
58255 Brown&Caldwell 9.171.54 Professional Services-Outfall Flow Meter Accuracy Test&Notices&Ads
58256 Bush&Associates,Inc. 7,588.00 Surveying Services MO 6-25-97
58257 Business Objects Americas 13,535.00 Software Maintenance&Support
58258 BEC-Building Electronic Controls,Inc. 1,890.80 Fire Alarm System Maintenance,Repair&Quarterly Inspection
58259 California Industrial Supplies 401.78 Mechanical Parts&Supplies
58260 Southern California Marine Institute 1,950.00 Ocean Monitoring Vessel Support
58261 Communications Performance Group,Inc. 18,233.02 Professional Services-Develop Hazardous Energy Control Procedures
58262 Computer Protection Technology,Inc. 5,192.21 Computer Software/Hardware
58263 CompuMaster 5,675.00 On-Site Excel Training
58264 Consolidated Electrical Distributor 1,723.15 Electrical Supplies
58265 Consolidated Plastics Company 96.40 Lab Supplies
58266 Consumers Pipe&Supply Co. 1,648.80 Plumbing Supplies
58267 Cooper Cameron Corporation 847.64 Engine Supplies
58268 Cooper Energy Services 4.13 Freight
58269 Corporate Express 7.174.08 Office Supplies
58270 Cortech Engineering 4.232.12 Pump Supplies
58271 Cost Containment Solutions 484.49 Worker's Comp.Services
58272 County of Orange-Auditor Controller 280.00 Encroachment Permit Fees
58273 County of Orange-Auditor Controller 727.00 Inspection Fees-Underground Storage Tank Closures at Pit. 1 and Plt.2
58274 County Wholesale Electric Co. 673.69 Electrical Parts&Supplies
58275 Culligan of Orange County 75.00 Maint.Agreement-Cen Gen Water Softener System
58276 Cummins Allison Corp. 4,332.58 Office Equipment-Facsimile Signature Machine
58277 Cytec Industries 18,155.40 Anionic Polymer Spec.No.9798-18
58278 CEM Corporation 82.61 Lab Parts&Supplies
58279 CWEA Membership 97.00 Membership-Calif.Water Environment Assoc.
58280 David's Tree Service 2,975.00 Tree Maint.Service
58281 Del Mar Analytical 1,629.00 Analysis of Biosolids and Wastewater
58282 Dell Computer 9,103.94 (1)Galaxy Server&Software/Hardware
58283 Diamond H Recognition 151.39 Employee Service Awards
58284 Digiterra,Inc. 8,723.64 Software/Hardware Upgrade-AS-400 Model 820
58285 Dodderer,Thomas 826.19 Employee Computer Loan Program
H:ldeptlfinlEXCEL.dta1220WPSHARE1Claims Paid Reportt02-030aims Paid Report-123103.As EXHIBIT)
fin/210nc Page 2 of 13 111er2co4
Claims Paid From 12/16/03 to 12/31/03
Warrant No. Vendor Amount Description
58286 Driver Alliant Insurance Service,Inc. 852.00 Excess Workers'Compensation
58287 DME,Inc. 541.85 Mechanical Parts&Supplies
58288 E.Sam Jones Distributors,Inc. 16.16 Electrical Supplies
58289 Easy Frame Sign Company,Inc. 834.52 Printing-District Bumper Stickers&Window Decals
58290 Employee Benefits Specialists,Inc. 648.55 Reimbursed Prepaid Employee Medical&Dependent Care
58291 Employers Group 1,750.00 On-Site Training-Communicating With Tact&Diplomacy
58292 Enchanter,Inc. 2,700.00 Ocean Monitoring&Outfall Inspection&Maintenance
58293 Engineering Central 49.99 Notices&Ads
58294 Equapac 2,043.18 Hydrochloric Acid
58295 ENS Resources, Inc. 15,000.00 Professional Services-Legislative Advocate
58296 Filarsky&Watt,L.L.P. 1,710.00 Prof.Services-SPMT Labor Negotiation Meetings&Special Services
58297 FileNET Corporation 24,961.18 Annual Maintenance-Electronic Document Management System
58298 Fisher Scientific 7,903.02 Lab Parts&Supplies
58299 Foodcraft Coffee&Refreshment Services 334.46 Meeting Supplies
58300 Fortis Benefits Insurance Company 24,174.93 Long-Term&Short-Term Disability Ins.Premium
58301 Fountain Valley Rancho Hand Wash 3,555.48 Gasoline
58302 Franklin Covey 560.24 Office Supplies
58303 G.E. Supply Company 170.48 Electric Parts
58304 Garratt-Callahan Company 853.38 Chemicals
58305 George T.Hall 109.33 Instrument Maintenance&Service
58306 Gierlich-Mitchell,Inc. 18,148.18 Belt Filter Press Supplies
58307 Golden State Controls 379.80 Instrument Parts&Supplies
58308 Great Western Sanitary Supplies 185.16 Janitorial Supplies
58309 Hach c/o Ponton Industries 153.23 Lab Parts&Supplies
58310 Hach Company 1,960.50 Lab Parts&Supplies
58311 Harrington Industrial Plastics,Inc. 1,027.54 Mechanical Parts&Supplies
58312 Hasco Oil Co.,Inc. 193.73 Grease
58313 Hill Brothers 16,315.16 Chemicals-Odor&Corrosion Control-Newport Trunkline
58314 Home Depot 735.76 Misc. Repair&Maintenance Material
58315 Hopkins Technical Products 1,322.86 Instrument Repair Service
58316 Hub Auto Supply 1,103.35 Vehicle Parts&Supplies
58317 Impulse 62.03 Instrument Repair Service
58318 Industrial Distribution Group 2,527.20 Hardware
58319 Industrial Fabrics Corp. 14,800.00 Mechanical Parts&Supplies
58320 Industrial Metal Supply 72.18 Metal
58321 Industrial Threaded Products,Inc. 477.86 Mechanical Parts&Supplies
58322 Information Resources 625.00 Human Resources Service-Background Checks
58323 Inorganic Ventures,Inc. 160.72 Lab Parts&Supplies
58324 Interstate Batteries of Cal Coast 694.49 Batteries for Vehicles&Carts
58325 Intratek Computer,Inc. 2,220.00 Network&Server Maintenance
58326 Iron Mountain 86.06 Bid Document Storage Fees P1-37&J-39
58327 Irvine Technology Corporation 21,472.00 Temporary Employment Services
58328 IDM Controls,Inc. 355.30 Electrical Parts&Supplies
58329 J&B Auto Parts 28.50 Auto Parts&Supplies
58330 J.G.Tucker and Son,Inc. 186.16 Specialty Gases
58331 J.O'Brien Company, Inc. 421.24 Security Badge Supplies
58332 Jay's Catering 2,362.94 Meeting Expenses
58333 Johnstone Supply 635.44 Electrical Supplies
H:ldeptUtn\EXCEL.dta1220WPSHARE1Claims Paid Report102-030aims Paid Report-123103.)ds EXHIBIT B
en/210no Page 3 of 13 1119/2004
Claims Paid From 12/16/03 to 12131/03
Warrant No. Vendor Amount Description
58334 J2 Printing Services 249.98 Printing-Forms
58335 Lab Safety Supply,Inc. 39.35 Safety Supplies
58336 Lexis-Nexis 27.98 Books&Publications
58337 Liebert Cassidy Whitmore 1,875.00 Human Resources Annual Training-Orange County Employment Relations Consortium
58338 Lifecom-Safety, Inc. 349.41 Instrument Repairs&Maintenance&Calibration Services
58339 Lucci's Gourmet Foods,Inc. 672.49 Meeting Expense
58340 M.J.Schiff&Associates, Inc. 520.00 Professional Services-Corrosion Engineering Survey
58341 Management Technologies 750.00 Professional Services-Project Management Consulting
58342 Mandic Motors 71.00 Towing Services
58343 Marathon Electric Manufacturing Corp. 923.50 Electrical Parts&Supplies
58344 Marden Susco,Inc. 2,138.84 Plumbing Supplies
58345 Matt Chlor,Inc. 3,594.10 Valves
58346 McMahan Business Interiors 5,562.06 Office Furniture-Ergonomic Chairs
58347 McMaster-Carr Supply Co. 1,480.45 Mechanical Parts&Supplies
58348 Mec Analytical System 8,433.00 Toxicity Analysis
58349 Medlin Controls Co. 191.04 Instrument Supplies
58350 Michael K.Strenstrum, PhD,P.E. 8,000.00 Professional Services-Oxygen Transfer Efficiency Test at Pit. 1 Aeration Basins
58351 Midway Mfg.&Machining Co. 18,559.63 Mechanical Parts,Supplies&Repair Services
58352 Mile Square Golf Course 25.00 Rental Equipment-Microphone for Ellis Avenue Community Workshop
58353 Mission Abrasive&Janitorial Supplies 300.62 Janitorial Supplies
58354 Mission Uniform Service 1,941.42 Uniform Rentals
58355 Morgan Company 2,826.28 Crane Truck Repair&Maintenance Services-V397
58356 Myers Power Products, Inc. 1,342.73 Electrical Parts&Supplies
58357 Mine Safety Applicances Company 2,990.89 Instrument Supplies
58358 National Plant Services, Inc. 6,250.00 Vacuum Truck Services
58359 National Technology Transfer,Inc. 4.997.50 On-Site Training-Custom Hands-On Hydraulics
58360 Neal Supply Co. 191.80 Plumbing Supplies
58361 Nickey Petroleum Co.,Inc. 4,811.13 Gear&Hydraulic Oil
58362 Norlab 2,586.00 Chemicals
58363 Nu-Way Laser Engraving 123.20 Steel Tags
58364 Office Depot Business Services Div. 436.62 Office Supplies
58365 OneSource Distributors,Inc. 161.07 Electrical Parts&Supplies
58366 The Orange County Register 1,289.54 Subscription
58367 Orange Courier 133.00 Courier Services
58368 Orange Fluid System Technologies,Inc. 1,157.58 Plumbing Parts&Supplies
58369 Oxygen Service Company 1,518.97 Specialty Gases
58370 OCB Reprographics 1,536.30 Printing Service-MO 1/26100
58371 Pacific Bell/WorldCom 15.93 Telephone Service
58372 Pacific Mechanical Supply 190,01 Plumbing Supplies
58373 Pacific Process Equipment,Inc. 19,395.00 Mechanical Parts&Supplies
58374 Parker Hannifin Corporation 478.95 Mechanical Parts&Supplies
58375 Parker Supply Company 5,669.00 Mechanical Parts&Supplies
58376 Parkhouse Tire,Inc. 181.31 Tires
58377 Partners Consulting Services 18,240.00 Professional Services-FIS On-Site Support-One World XE Migration Project
58378 Patriot Video Productions 418.29 Videos
58379 Power Electro Supply Co.,Inc. 14.48 Electrical Supplies
58380 Power Measurement USA,Inc. 3,600.00 Software
58381 Praxair Distribution,Inc. 160.01 Lab Parts&Supplies
H:ldeptlfinlEXCEL.dta1220WPSHARE1Claims Paid Report102-031CIaims Paid Report.123103.As EXHIBIT.
ftnr210Ac Page 4 of 13 1/19/2004
Claims Paid From 12116103 to 12/31103
Warrant No. Vendor Amount Description
58382 Pre-Paid Legal Services,Inc. 463.45 Employee Legal Service Insurance Premium
58383 Primary Source Office Furnishings, Inc. 5,703.37 Office Furniture
58384 Putzmeister-America 322.24 Mechanical Parts&Supplies
58385 PAPA 55.00 O&M Training Registration
58386 Quinn Shepherd Machinery 766.21 Oil,Air&Fuel Filters
58387 Rainbow Disposal Co. 2,730.33 Trash Removal
58388 Realtime Systems Corporation 6,810.80 Software Annual Maintenance&Support
58389 Red Wing Shoes 156.88 Reimbursable Safety Shoes
58390 Regents of Univ.of California 982.98 Professional Services J-85
58391 Reliastar 9,594.55 Employee Basic Life Insurance Premium
58392 Retrofit Parts&Components,Inc. 70.11 Air Filters
58393 Ricoh Business System 1,623.90 Color Copier Lease
58394 RPM Electric Motors 3,940.92 Pump Repairs
58395 RS Hughes Co,Inc. 347.22 Paint Supplies
58396 Santa Ana River Flood Protection Agency 1,400.00 Membership
58397 Schwing America,Inc. 1,123.93 Pump Supplies
58398 Scottel Voice&Data, Inc. 2,284.80 Telephone System Maintenance
58399 Sigma-Aldrich,Inc. 82.40 Lab Supplies
58400 Smith-Emery Company 780.00 Soils,Concrete&Other Materials Testing
58401 Southern Counties Oil Co. 9,994.35 Diesel Fuel
58402 Southwest Air Balance Corp. 250.00 Professional Services P1-37
58403 Sparling Instruments, Inc. 350.00 Outfall Flow Meter Calibration&Maintenance Services
58404 Spectrum Video,Inc. 2,921.25 Professional Services-Board Room Audio-Visual Design
58405 Spex Certiprep,Inc. 406.94 Lab Supplies
58406 Stanley Steamer International,Inc. 1,980.55 Carpet Cleaning Services
58407 Sunset Industrial Parts 717.85 Mechanical Supplies
58408 Super PC Memory 13.00 Freight
58409 Sy Nielson Service,Inc. 960.00 Instrument Supplies
58410 Symcas-TSG 1,381.60 SCADA System VAX Service Agreement
58411 Systime Computer Corp. 600.00 Professional Services-J D Edwards One World XE Support
58412 SARBS-CWEA 100.00 O&M Training Registration-California Water Environment Association
58413 SPX Valves&Control 1,151.77 Mechanical Parts&Supplies
58414 Techno Coatings 13,110.00 Painting Services-Admin Bldg.,Source Control Interior Area
58415 Tetra Tech,Inc. 194.00 Professional Services 7-37
58416 Thompson Industrial Supply,Inc. 2,727.36 Mechanical Supplies
58417 Tony's Lock&Safe Service&Sales 12.12 Locks&Keys
58418 Toshiba International Corporation 1,856.83 Electrical Supplies
58419 Truck&Auto Supply,Inc. 165.59 Automotive Supplies
58420 Ultra Scientific 257.00 Lab Supplies
58421 United States Treasury 16,992.75 Professional Services J-85-Naval Post Graduate School
58422 UC Regents 360.00 Mechanical Maintenance Training Registration
58423 US Filter Westates Carbon 3,905.94 Filter Carbon
58424 The Vantage Group,L.L.C. 13,034.00 Temporary Employment Service
58425 Vapex,Inc. 342.65 Instrument Parts&Supplies
58426 Varian,Inc. 1,536.20 Lab Parts&Supplies
58427 Verizon California 526.60 Telephone Services
58428 Veme's Plumbing 225.00 Service Contract-Testing&Cert. Backflow Devices at Pits. 1 &2&Pump Sta.
58429 Vertex,Inc. 8,081.25 Software License-Vertex Payroll Tax Q Series
H:ldeptlrinlEXCEL.dta1220MPSHARE%Claims Paid Reportl02-031CIalms Paid Report-123103.xis EXHIBIT B
fin121011c Page 5 of 13 1/19/2004
Claims Paid From 12116103 to 12131103
Warrant No. Vendor Amount Description
58430 Village Nurseries 228.69 Landscaping Supplies
58431 Villalobos&Associates 24,805.25 Professional Services-Collection System Siphon&Force Main Assessment
58432 Vision Service Plan-(CA) 9,140.64 Vision Service Premium
58433 Vocam USA,L.L.C. 403.19 Safety Video
58434 VWR Scientific Products 1,489.14 Lab Supplies
58435 The Wackenhut Corporation 11,844.67 Security Guards
58436 Water 3 Engineering,Inc. 12,701.64 Engineering Service J-67
58437 Weber Scientific 281.29 Lab Supplies
58438 West Coast Safety Supply Co. 141.19 Safety Supplies
58439 WEF-Registration Dept. 530.00 Registration-Air Quality Meeting Registration
58440 WEF 544.00 Membership-Water Environment Federation&Compliance Meeting Registration
58441 Xerox Corporation 13,778.28 Fax/Copier Leases and Supplies
58442 York International 5,000.00 Start-Up&Programming York Microgateway at Chiller&Siemens Building
58443 California Bank&Trust 2,889.00 Construction J-33-1A,Retention
58444 Michael A.Berdis 170.00 Meeting/Training Expense Reimbursement
58445 James A.Carter 100.00 Meeting Training Expense Reimbursement
58446 Richard A.Castillon 999.72 Meeting/Training Expense Reimbursement
58447 Frank Chavez 170.00 Meeting/Training Expense Reimbursement
58448 Allan P.Dumlao 95.00 Meeting/Training Expense Reimbursement
58449 Martin G. England 1,329.63 Meeting/Training Expense Reimbursement
58450 Jerry F. Evangelista 698.66 Meeting/Training Expense Reimbursement
58451 Deirdre E.Hunter 393.33 Meeting/Training Expense Reimbursement
58452 Rachel J.Parker 1,010.15 Meeting/Training Expense Reimbursement
58453 Mahin Talebi 698.66 Meeting/Training Expense Reimbursement
58454 Edward M.Torres 121.99 Meeting/Training Expense Reimbursement
58455 Ernest N.Yeboah 239.24 Meeting/Training Expense Reimbursement
58456 Aquarium of the Pacific 123.45 Reimbursable Employee Activity Expense
58457 Cain,Gail 1,855.17 Employee Computer Loan Program
58458 Cortex International 1,113.75 Professional Services P2-60
58459 County of Orange 43.00 Annexation Fee
58460 County of Orange 43.00 Annexation Fee
58461 County of Orange 43.00 Annexation Fee
58462 County of Orange 43.00 Annexation Fee
58463 County of Orange 43.00 Annexation Fee
58464 Kienow Associates,Inc. 15.195.88 Legal Services 1-2-4
58465 Orange County Sanitation District 862.17 Petty Cash Reimb.
58466 State Board of Equalization 350.00 Annexation Fee
58467 Sudds,Charles 1.114.24 Employee Computer Loan Program
58468 Tule Ranch/Magan Farms 192,032.99 Residuals Removal MO 3-29-95
58469 Orange County Sanitation District 659,213.36 Payroll EFT Reimbursement
58470 Court Order 150.00 Wage Garnishment
58471 Court Trustee 69.12 Wage Garnishment
58472 Employee Benefits Specialists,Inc. 7,790.92 Reimbursed Prepaid Employee Medical&Dependent Care
58473 Court Order 445.00 Wage Garnishment
58474 Franchise Tax Board 100.00 Wage Garnishment
58475 Internal Revenue Service 450.00 Wage Garnishment
58476 Intl.Union of Oper.Eng AFL-CIO Local 501 3,568.78 Dues Deduction
58477 National Bond&Trust 1,813.73 U.S.Savings Bonds Payroll Deductions
H:ldeptUEn1EXCEL.dta12201APSHARE1Claims Paid Report102-031Claims Paid Report-123103.xls EXHIBIT,3
fin/210Ac Page 6 of 13 1/19/2004
Claims Paid From 12/16/03 to 12131103 ,
Warrant No. Vendor Amount Description
58478 OCEA 518.53 Dues Deduction
58479 Court Order 40.00 Wage Garnishment
58480 Court Order 296.00 Wage Garnishment
58481 Peace Officers Council of CA 1,062.00 Dues Deduction
58482 Court Order 721.50 Wage Garnishment
58483 United Way 280.00 Employee Contributions
58484 Voided Check - -
58485 American Express 25,858.95 Purchasing Card Program,Misc.Supplies&Services
58486 Atkins Americas,Inc. 34.607.12 Professional Services J-40-6
58487 Painewebber Incorporated 38,126.50 COP Remarketing Agreement
58488 Woodruff,Spradlin&Smart 81,878.09 Legal Services MO 7-26-95
58489 Airgas Safety,Inc. 35.06 Safety Supplies
58490 Allied Packing&Rubber, Inc. 219.74 Mechanical Supplies
58491 American Airlines 3,630.50 Travel Services
58492 American Telephone&Telegraph Corp. 297.50 Telephone Service
58493 Environmental Management Consulting 3,915.00 Prof. Serv.-Data Analysis&Reporting&Ventilation Measurement for Belt Press Bldg.
58494 Environmental Microbiology Consulting 18,549.22 Professional Services J-40-6
58495 Franklin Covey 492.08 Office Supplies
58496 Fry's Electronics 1,568.46 Computer Supplies
58497 Hagemeyer North America 4,030.46 Prescription Safety Glasses
58498 Irvine Ranch Water District 44.83 Water Use
58499 League Of Ca Cities 5.000.00 Administration Meeting Expenses
58500 New Horizons CLC of Santa Ana 15,900.00 Software-Technical Seat 1-Yr.License
58501 Office Depot Business Services Div. 821.56 Office Supplies
58502 Orange Fluid System Technologies,Inc. 1,361.94 Mechanical Parts&Supplies
58503 Terri L.Roberts 21.36 OCERS Withholding Refund on Dec.2000 Leave Payout
58504 Safetycare,Inc. 237.05 Safety Video
58505 Shureluck Sales&Engineering 880.47 Mechanical Parts&Supplies
58506 SBC 969.54 Telephone Services
58507 Rule 222 Filings 184.56 Rule 222 Filings-Permit Fee
58508 Thompson Industrial Supply,Inc. 6,104.59 Mechanical Supplies
58509 United Parcel Service 50.48 Parcel Services
58510 Verizon California 5,711.25 Telephone Services
58511 VI-Systems,Inc. 1,063.75 Professional Services-Microsoft Exchange Consulting for Disaster Recovery
58512 Waxie Sanitary Supply 78.58 Janitorial Supplies
58513 Juan J.Ambriz 148.00 Meeting/Training Expense Reimbursement
58514 Michael N. Morey 175.00 Meeting/Training Expense Reimbursement
58515 Robert J.Taylor 739.24 Meeting/Training Expense Reimbursement
58516 Kimberly J.Tolsma 100.00 Meeting/Training Expense Reimbursement
58517 Albonni,Bashar 903.95 User Fee Refund Regarding Septic Tanks
58518 County of Orange 5,107.20 Annexation Fee-J-77
58519 County of Orange-Auditor Controller 75.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
58520 Deckard,Jill 903.95 User Fee Refund Regarding Septic Tanks
58521 Elliott,Lynn 1,110.75 Employee Computer Loan Program
58522 Gausewitz,Alfred 903.95 User Fee Refund Regarding Septic Tanks
58523 Guerrero,Francisca C. Leon 903.95 User Fee Refund Regarding Septic Tanks
58524 Hove,Bryce 903.95 User Fee Refund Regarding Septic Tanks
58525 Marchegiano,Debbie 2,018.45 Employee Computer Loan Program
H:ldept\frnlEXCEL.dta122044PSHARE1Claims Paid Report102-MClaims Paid Report-123103AS EXHIBIT B
env21011c Page 7 of 13 1/19/2004
Claims Paid From 12/16103 to 12/31/03
Warrant No. Vendor Amount Description
58526 Ortiz,Ramon 903.95 User Fee Refund Regarding Septic Tanks
58527 Peek,David 903.95 User Fee Refund Regarding Septic Tanks
58528 Pooler,Dorothy 903.95 User Fee Refund Regarding Septic Tanks
58529 Reuss,Robert 903.95 User Fee Refund Regarding Septic Tanks
58530 Schneirson, Ron 1,247.76 User Fee Refund Regarding Septic Tanks
58531 Sexton,Gregory 1,247.76 User Fee Refund Regarding Septic Tanks
58532 T&J Performance,Inc. 2,688.36 Truck Parts&Repairs-Bumper-V389
58533 Wu,Janice 946.08 User Fee Refund Regarding Septic Tanks
58534 Court Order 597.50 Wage Garnishment
58535 Air Products&Chemicals 26,294.06 O&M Agreement Oxy Gen Sys MO 8-8-89
58536 ARK Technologies 60,000.00 County of Orange Tax System Data Processing
58537 Basic Chemical Solutions,L.L.C. 42,813.63 Sodium Bisulfite&Caustic Soda
58538 Black&Veatch Corporation 97,290.43 Engineering Services 131-76,J-71-3,132-85,J-87&Hydrogen Peroxide Project
58539 Boyle Engineering Corporation 47,803.03 Engineering Services 1-2-4
58540 Brown&Caldwell 29,281.98 Professional Services P1-37
58541 California Soil Products 81,765.76 Residuals Removal MO 3-29-95
58542 CASA 48,825.00 Membership&Contribution to Biosolids Program Fund
58543 CH2MH1II 164,506.60 Professional Services J-40-6&J-40-7
58544 Dharma Consulting 114,750.00 Prof.Serv.-EMT Coaching,Strategic Ping. Process Team Trng.&EMT Leadership Survey
58545 Innerline Engineering 67,851.34 CCTV Videoing of Trunkline Sewers
58546 IPMC c/o Parsons 1,107,696.00 Professional Services-Integrated Program Management
58547 Kemiron Pacific,Inc. 172,419.33 Ferric Chloride MO 9-27-95
58548 Mainline Information systems 35,746.06 Software/Hardware-DASD for AS/400
58549 Partners Consulting Services 45,840.00 Temporary Employment Services
58550 Pioneer Americas,Inc. 235,121.72 Sodium Hypochlorite
58551 Polydyne, Inc. 52,336.48 Cationic Polymer MO 3-11-92
58552 Southern California Edison 83,438.65 Power
58553 Systime Computer Corp. 83,085.00 Professional Services-J D Edwards One World XE Implementation
58554 Tule Ranch/Magan Farms 173,208.23 Residuals Removal MO 3-29-95
58555 U.S. Metro Group,Inc. 26,235.00 Janitorial&Floor Maintenance at Plants 1 &2
58556 Waste Markets 59,414.94 Maint.Agreement-Grit&Screenings Removal&Digester Bed Mat'l. Removal
58557 Cora Constructors 124,605.00 Construction 7-7-2
58558 Insituform Technologies,Inc. 153,733.11 Construction 5-29-R1
58559 Aanderaa Instruments 4,206.70 Coastal Physical Oceanographic Mooring
58560 Able Scale Repair 600.00 Loading Scales Quarterly Inspection
58561 Accurate Measurement Systems 512.72 Instrument Supplies
58562 Advance Business Graphics 3,413.42 Stationery&Office Supplies
58563 Air Duct Cleaning Company 3,927.00 Air Duct Cleaning Services
58564 Air Liquide America Corporation 2.561.66 Specialty Gases
58565 Airborne Express 26.06 Air Freight
58566 Airgas Safety,Inc. 3,217.92 Safety Supplies
58567 AliMed,Inc. 135.91 Computer Supplies
58568 Amot Control Corporation 219.95 Mechanical Parts&Supplies
58569 Anixter,Inc. 880.10 Computer Software/Hardware
58570 Aquatic Bioassay And Consulting Labs,Inc. 750.00 Toxicity Testing
58571 Aspen Publishers,Inc. 209.70 Publication
58572 Atlantis Pool Care 250.00 Service Agreement-Admin. Bldg.Atrium
58573 American Telephone&Telegraph Corp. 1,233.52 Telephone Conference Services
H:ldeptlfin%EXCEL.dta1220L4PSHARE1Claims Paid ReporA02-031CIalms Paid Report-123103.)ds EXHIBIT,
rnr210nc Page 8 of 13 111912004
Claims Paid From 12116103 to 12/31/03
Warrant No. Vendor Amount Description
58574 AT&T Universal Biller 2,976.98 Telephone Service
58575 American Telephone&Telegraph Corp. 71.16 Telephone Service
58576 AVWVA 131.00 Membership-American Water Works Association
58577 Battery Specialties 1,026.91 Batteries
58578 Benz Compressed Air Systems,Inc. 801.32 Compressor Parts
58579 Bureau of Reclamation 22,308.00 Cost-Sharing Project J-36
58580 Caltrol,Inc. 1,492.61 Mechanical Parts&Supplies
58581 Cardlock Fuel Systems,Inc. 624.92 Fueling District Vehicles at Local Gas Stations
58582 Cashco,Inc. 670.54 Mechanical Parts&Supplies
58583 Charles P.Crowley Co. 2,582.57 Mechanical Parts&Supplies
58584 Compressor Components Of California 1,248.00 Coil Cleaning&Testing&Compressor Parts
58585 Consolidated Electrical Distributor 2,230.90 Electrical Supplies
58586 Cooper Cameron Corporation 174.30 Engine Supplies
58587 Corporate Express Imaging 1,256.46 Computer Supplies
58588 Corporate Express 8,909.57 Office Supplies
58589 Cortech Engineering 15.242.18 Pump Supplies
58590 County of Orange-Auditor Controller 35.00 Encroachment Permit Fees
58591 County Wholesale Electric Co. 581.42 Electrical Parts&Supplies
58592 Crane Veyor Corp. 2,771.13 Repair&Maintenance Services
58593 CALPELRA 480.00 Membership-Calif. Public Employers Labor Relations Assoc.
58594 CEM Corporation 752.81 Lab Supplies
58595 CR&R,Inc. 1,575.00 Container Rentals
58596 California Special Districts Association 357.00 Membership
58597 CSMFO 875.00 Accounting Meeting Registration
58598 Daniel Company,L.L.C. 10,499.25 Repairs&Maintenance Services to Primary Scrubber Complex
58599 Dapper Tire Co. 278.33 Truck Tires
58600 David's Tree Service 5,300.00 Tree Maint.Service
58601 Detection Instruments Corporation 8,586.85 Ins.Parts&Supplies
58602 Dickson's,Inc. 872.99 Air Conditioner Unit
58603 Dunkel Bros.Machinery Moving,Inc. 4,000.00 Equipment Moving Services
58604 Dunn-Edwards Corporation 93.14 Paint Supplies
58605 Dwyer Instruments,Inc. 266.17 Instrument Parts&Supplies
58606 DGA Consultants,Inc. 5,148.50 Professional Services-CCTV Data Evaluation
58607 E.Sam Jones Distributors,Inc. 163.73 Electrical Supplies
58608 Ecology Control Industries 15,009.84 Hazardous Waste Disposal
58609 Edinger Medical Group,Inc. 1,350.91 Medical Screening
58610 Enchanter,Inc. 3.600.00 Ocean Monitoring&Outfall Inspection&Maintenance
58611 Environmental Resource Association 1,432.90 Lab Supplies
58612 Ewing Irrigation Industrial 129.28 Plumbing Parts&Supplies
58613 ENS Resources,Inc. 15,000.00 Professional Services-Legislative Advocate
58614 FedEx Corporation 72.92 Air Freight
58615 Fisher Scientific 4,744.39 Lab Supplies
58616 Five Star Metals,Inc. 343.70 Mechanical Parts&Supplies
58617 Fluor Enterprises,Inc. 12,792.56 Engineering Services J-84
58618 Foodcraft Coffee&Refreshment Services 298.20 Meeting Supplies
58619 Fountain Valley Paints,Inc. 251.06 Paint Supplies
58620 Fountain Valley Rancho Hand Wash 2,232.13 Truck Wash Tickets
58621 Franklin Covey 229.73 Office Supplies
H:ldeptTttn%EXCEL.dta12201APSHARE%Claims Paid Report102-031Claims Paid Report-123103.)ds EXHIBIT B
rnr210nc Page 9 of 13 1119r2004
Claims Paid From 12116/03 to 12131/03
Warrant No. Vendor Amount Description
58622 Fry's Electronics 112.02 Computer Supplies
58623 Garland Manufacturing Co. 825.00 Mechanical Parts&Supplies
58624 Garratt-Callahan Company 2.358.65 Chemicals
58625 Gastech 2,845.28 Instrument Parts&Supplies
58626 George T.Hall 562.99 Electrical Parts&Supplies
58627 George Yardley Co. 789.57 Electrical Parts&Supplies
58628 Grainger,Inc. 3,477.90 Electrical Parts&Supplies
58629 Graybar Electric Company 1,365.00 Software/Hardware
58630 Guarantee Records Management 233.16 Off-Site Records Storage
58631 GS Edwards Systems Technology 592.06 Maintenance&Repair Services-Fire Alarm System
58632 Haaker Equipment Company 402.06 Misc.Vehicle,Parts,Repairs&Service
58633 Hach c/o Ponton Industries 15,541.19 Lab Parts&Supplies
58634 Hagemeyer North America 1,070.54 Prescription Safety Glasses
58635 Harold Primrose Ice 138.75 Ice For Samples
58636 Harrington Industrial Plastics,Inc. 594.56 Instrument Parts&Supplies
58637 Hasco Oil Co.,Inc. 193.73 Grease
58638 The Holman Group 907.20 Employee Assistance Program Premium
58639 Home Depot 193.94 Misc.Repair&Maintenance Material
58640 Horizon Technology 393.93 Lab Supplies
58641 Hydrotex 1,567.09 Lube Oil
58642 I. D.Industries,Inc. 19.42 Mechanical Supplies
58643 IDEXX Laboratories,Inc. 702.53 Lab Supplies
58644 Industrial Distribution Group 2,811.75 Mechanical Parts,Supplies,Paint&Hardware
58645 Industrial Metal Supply 1,264.55 Metal
58646 Inside EPA 635.00 ECM Publication
58647 Ionics Instrument Business Group 124.08 Lab Supplies
58648 Irvine Photo Graphics 249.98 Photographic Services
58649 J&L Industrial Supply 669.20 Tools
58650 Jamison Engineering Contractors, Inc. 4,500.00 Repair&Maintenance Services-Digester#12
58651 Johnstone Supply 676.56 Electrical Supplies
58652 Kforce,Inc. 1,766.16 Temporary Employment Services
58653 Lewis&Lewis Enterprises 261.14 Office Supplies
58654 Long Beach Iron Works 1,885.63 Manhole Frames&Covers
58655 Lucci's Gourmet Foods, Inc. 276.82 Meeting Expense
58656 Lustre-Cal 671.85 Printing-Wastehauler Decals
58657 Maintenance Technology Corp. 1.715.53 Welding Supplies
58658 Mandic Motors 99.00 Towing Services
58659 MarVac Electronics 87.31 Electrical Parts&Supplies
58660 MassMutual Michel Financial Group 1,328.95 Executive Disability Plan Premium
58661 McGarry Central 131.59 Office Equipment Repair&Maintenance Services
58662 McMahan Business Interiors 803.80 Minor Furniture&Fixtures
58663 McMaster-Carr Supply Co. 198.12 Mechanical Parts&Supplies
58664 Mechanical Seal Repair,Inc. 3,043.94 Repair&Maintenance Services
58665 Medlin Controls Co. 190.40 Instrument Supplies
58666 Milltronics,Inc. 957.37 Electrical Supplies
58667 Mission Abrasive&Janitorial Supplies 84.91 Janitorial Supplies
58668 Mission Uniform Service 1,531.33 Uniform Rentals
58669 MAACO Auto Painting&Bodyworks 374.04 Auto Painting Services-Trailer 903
H:IdepI in%EXCEL.d1a12201APSHARE1Clatms Paid ReporA02-031CIaims Paid Report-123103.)ds EXHIBIT)
rn1210nc Page 10 of 13 1119i2oo4
s
Claims Paid From 12116/03 to 12131103
Warrant No. Vendor Amount Description
58670 MARMAC Field Services,Inc. 6.184.00 Professional Services P1-92
58671 MDS Consulting 18,187.09 Prof.Services-Surveying Various Capital Projects
58672 National Fire Protection Association 135.00 Membership
58673 Neal Supply Co. 1,231.47 Plumbing Supplies
58674 NetVersant of Southern California 2,198.10 Security System Access Control Cards-Blank Stock
58675 City of Newport Beach 72.97 Water Use
58676 Nickey Petroleum Co.,Inc. 1,229.81 Machine Oil
58677 Ninyo&Moore Corporate Accounting 16,886.54 Professional Services-Materials Testing, Inspection&Geotechnical Engrg.
58678 The Norco Companies 170.78 Mail Delivery Service
58679 Norms Refrigeration 118.18 Electrical Parts&Supplies
58680 NASSCOIPACP 2,250.00 O&M Training Registration
58681 O'Connor Sales,Inc. 1,773.32 Mechanical Parts&Supplies
58682 Office Depot Business Services Div. 476.97 Office Supplies
58683 Omega Industrial Supply,Inc. 1,656.60 Janitorial Supplies
58684 OneSource Distributors,Inc. 156.84 Electrical Parts&Supplies
58685 Orange County Hose Company 30.70 Hydraulic Hose Supplies&Parts
58686 Ortiz Fire Protection 2,655.00 Quarterly Inspection,Maint.&Certification of Fire Sprinkler Systems at Plts.1 &2
58687 Oxygen Service Company 2,725.29 Specialty Gases
58688 OCB Reprographics 242.61 Printing Service-MO 1/26/00
58689 P.L. Hawn Company, Inc. 1,027.94 A/C Filters
58690 Pacific Parts&Controls,Inc. 1,142.14 Electrical Supplies
58691 Parkhouse Tire,Inc. 164.03 Tires
58692 PenValve 1,407.50 Mechanical Parts&Supplies
58693 Port Supply 263.33 Safety Supplies
58694 Power Design 2,343.56 Electrical Supplies
58695 Power Electro Supply Co.,Inc. 59.77 Electrical Supplies
58696 PCG Industries 1,150.00 Repair&Maintenance Services
58697 PCS Express,Inc. 200.50 Courier Service
58698 PRSA-Orange County Chapter 155.00 Membership-Public Relations Society of America
58699 PVF Sales,Inc. 314.55 Mechanical Parts&Supplies
58700 R W Beck 3,497.80 Professional Services P1-90
58701 Ramsay Corporation 698.00 Office Supplies
58702 Reliastar Bankers Security Life Ins. 9,929.56 Employee Life Ins. Premium,Short-Term Disability&Cancer Ins. Payroll Deductions
58703 Royale Cleaners 38.00 Uniform Cleaning Services
58704 RPM Electric Motors 279.48 Motor
58705 RS Hughes Co,Inc. 278.30 Paint Supplies
58706 S.P. Kinney Engineers,Inc. 217.19 Mechanical Parts&Supplies
58707 Sancon Engineering, Inc. 3,045.00 Construction-Pump Out(3)Air Jumper Lines
58708 Schwing America,Inc. 153.78 Pump Supplies
58709 Scottel Voice&Data,Inc. 2,284.80 Telephone System Maintenance
58710 Seton Name Plate Corp 332.57 Safety Signs
58711 Shamrock Supply Co.,Inc. 2,269.05 Mechanical Parts&Supplies
58712 Shureluck Sales&Engineering 3,121.94 Name Plates&Holders
58713 Skalar,Inc. 801.98 Lab Parts&Supplies
58714 Smith Pipe&Supply,Inc. 458.48 Plumbing Supplies
58715 Snap-On Tools,Inc. 625.93 Tools
58716 Southern California Edison 1,752.86 Power
58717 Sparkletts 1,493.19 Drinking Water/Cooler Rentals
H:IdeptlfnlEXCEL.dta1220%APSHAREIClaims Paid Report102.030aims Paid Report-123103.xls EXHIBIT B
fn1210Ac Page 11 of 13 1/19/2004
Claims Paid From 12/16103 to 12131/03
Warrant No. Vendor Amount Description
58718 Steven Enterprises,Inc. 579.36 Printing-Forms
58719 Summit Steel 52.56 Metal
58720 Sunset Industrial Parts 226.71 Mechanical Supplies
58721 Synagro Technologies, Inc. 595.00 Residuals Removal MO 3-29-95
58722 SPEC Services,Inc. 18,847.66 Engineering Services J-33-1
58723 SPX Valves&Controls 1,151.77 Mechanical Parts&Supplies
58724 Terminix International 3,030.00 Pest Control
58725 Thermo Environmental Instruments 365.12 Rechargeable Battery
58726 Thompson Industrial Supply,Inc. 451.66 Mechanical Supplies
58727 Times Community News 143.75 Notices&Ads
58728 Tony's Lock&Safe Service&Sales 127.42 Locks&Keys
58729 Townsend Public Affairs 5,000.00 Legislative&Executive Advocate for Grant Funding
58730 Tropical Plaza Nursery, Inc. 9,771.91 Contract Groundskeeping MO 5-11-94
58731 Truck&Auto Supply,Inc. 102.08 Automotive Supplies
58732 Truesdail Laboratories,Inc. 100.00 Analysis of Biosolids and Wastewater
58733 TCH Associates,Inc. 2,036.77 Lab Supplies
58734 Teksystems 21,862.00 Temporary Employment Services
58735 U.S.Composting Council 250.00 Compliance Meeting Registration
58736 U.S. Peroxide,L.L.C. 20,241.28 Hydrogen Peroxide
58737 Ultra Scientific 944.99 Lab Supplies
58738 United Parcel Service 1,150.12 Parcel Services
58739 UC Regents 360.00 Compliance Training Registration
58740 US Equipment Co.,Inc. 312.65 Filters
58741 The Vantage Group, L.L.C. 9,268.00 Temporary Employment Service
58742 Varian,Inc. 2,500.00 Lab Training Registration
58743 Verizon California 177.29 Telephone Services
58744 Verne's Plumbing 105.00 Service Contract-Testing&Cert. Backflow Devices at Pits. 1 &2&Pump Sta.
58745 Vibratronics,Inc. 7,262.78 Multifunctional Ultrasonic Detector Kit
58746 Village Nurseries 59.25 Landscaping Supplies
58747 VWR Scientific Products 1,856.81 Lab Supplies
58748 The Wackenhut Corporation 12,869.64 Security Guards
58749 West Coast Safety Supply Co. 924.60 Safety Supplies&Tools
58750 Westport Aparatus DBA Breaker Supply 499.28 Electrical Parts&Supplies
58751 WEF-Registration Dept. 475.00 Planning Meeting Registration
58752 WEF 177.00 Membership-Water Environment Federation
58753 WS Atkins Water 5.500.00 Professional Services SP-90
58754 Xerox Corporation 12,137.00 Fax&Copier Leases
58755 Yokogawa Corporation of America 195.54 Instrument Supplies
58756 Jose C.Ambriz 51.00 Meeting/Training Expense Reimbursement
58757 Marc A.Brown 215.00 Meeting/Training Expense Reimbursement
58758 George A.Charette 107.00 Meeting/Training Expense Reimbursement
58759 Chloe D. Dao 150.00 Meeting/Training Expense Reimbursement
58760 Carla D. Dillon 150.00 Meeting/Training Expense Reimbursement
58761 Michele Farmer 435.00 Meeting/Training Expense Reimbursement
58762 Victor R.Hermelin 41.00 Meeting/Training Expense Reimbursement
58763 Thomas A. Hunt 170.00 Meeting/Training Expense Reimbursement
58764 Karen L.Jackson 165.28 Meeting/Training Expense Reimbursement
58765 Antonino Pira 1,806.69 Meeting/Training Expense Reimbursement
H:ldeptUnIEXCEL.dta12201APSHARE\Claims Paid Report102-03%Clalms Paid Report-123103.)ds EXHIBIT B
frn/21011c Page 12 of 13 1119/2004
Claims Paid From 12/16/03 to 12131/03
Warrant No. Vendor Amount Description
58766 Patrick A.Sullivan 170.00 Meeting/Training Expense Reimbursement
58767 James G.Tintle 51.00 Meeting/Training Expense Reimbursement
58768 County of Orange-Auditor Controller 518.00 Underground Storage Tank,Hazardous Material,&State Fees
58769 Local Agency Formation Commission 1,150.00 Annexation Fee
58770 Local Agency Formation Commission 1,150.00 Annexation Fee
58771 Orange County Sanitation District 938.79 Petty Cash Reimb.
Total Accounts Payable-Warrants $ 13,359,483.58
Payroll Disbursements
32604-32698 Employee Paychecks $ 164,735.27 Biweekly Payroll 12/23/03
32699-32702 Employee Paychecks $ 2,900.24 Payroll Correction&Adjustment, Reissue Stale Dated Check,&Termination
93056-93564 Direct Deposit Statements 1,005,346.80 Biweekly Payroll 12/23/03
Total Payroll Disbursements $ 1,172,982.31
Wire Transfer Payments
U.S. Bank $ 85,466.02 December Interest Payment on Series 2000 Certificates of Participation
Total Wire Transfer Payments $ 85,466.02
Total Claims Paid 12116103-1 2/31103 $ 14,617,931.91
H:ldept%fin\EXCEL.dta1220%PSHARBClaims Paid Report102-031Claims Paid Report-123103.)ds EXHIBIT B
fin1210Ac Page 13 of 13 1119/2004
BOARD OF DIRECTORS Meeting Date To Bd.of Dir.
02/25/04
AGENDA REPORT Item Number Item Number
8
Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Lenora Crane, Executive Assistant
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
CONFLICT OF INTEREST NOTIFICATION
Pursuant to Government Code Section 84308, you are required to disclose any campaign
contribution greater than $250 received in the past twelve months from any party to a contract
involving the Orange County Sanitation District. Further, you may not participate in the decision
making process to award a contract to such party.
For reference, you are directed to the Register of Warrants as to all current contractors/vendors
with the District.
In general, you must disclose the basis of the conflict by identifying the name of the firm or
individual who was the contributor.
For the specifics of Government Code Section 84308, please see your Director's Handbook or
call the office of General Counsel.
SUMMARY
See attached listing.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ATTACHMENTS
1. Copies of Claims Paid reports from 01/01/04 — 01/15/04 and 01/16/04 —01/31/04
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Repo rts\0204\Item 8.doc
Revised: 06/04/03
Claims Paid From 01/01/04 to 01/16/04
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
58772 Coral Energy Resources,L.P. $ 122,285.99 Natural Gas
58773 Orange County Sanitation District 658,943.65 Payroll EFT Reimbursement
58774 Southern California Edison 53,659.87 Power
58775 American Airlines 1,157.50 Travel Services
58776 ABB Automation, Inc. 1,139.87 Instrument Calibration&Certification
58777 American Telephone&Telegraph Corp. 73.22 Telephone Service
58778 AT&T Wireless Services-Airtime 3,536.44 Cellular Airtime
58779 Barnes&Thornburg 9,500.00 Membership-Federal Water Quality Coalition
58780 Court Order 150.00 Wage Garnishment
58781 Court Trustee 69.12 Wage Garnishment
58782 Cybertek Training Centers 895.00 Planning Training Registration
58783 Employee Benefits Specialists, Inc. 10,904.63 Reimbursed Prepaid Employee Medical&Dependent Care
58784 Voided Check - -
58785 First Metro Appraisals 4,500.00 Real Estate Appraisal-Proposed Buena Park Chemical Feed Station
58786 Foodcraft Coffee&Refreshment Services 147.44 Meeting Supplies
58787 Franchise Tax Board 100.00 Wage Garnishment
58788 City of Huntington Beach 20,908.95 Water Use
58789 Internal Revenue Service 500.00 Wage Garnishment
58790 Intl.Union of Oper.Eng.AFL-CIO Local 501 3,748.81 Dues Deduction
58791 MBC Applied Environmental Sciences 2,891.75 Consortium Contribution-Central Region Kelp Survey
58792 National Bond&Trust 2,108.91 U.S.Savings Bonds Payroll Deductions
58793 City of Newport Beach 12.51 Water Use
58794 Nextel Communications 3,863.35 Cellular Phones&Air Time
58795 Orange County Sheriff 396.30 Wage Garnishment
58796 OCEA 570.86 Dues Deduction
58797 Court Order 40.00 Wage Garnishment
58798 Court Order 296.00 Wage Garnishment
58799 Peace Officers Council of CA 1,593.00 Dues Deduction
58800 Senate Rules Committee 6.47 Publication
58801 Court Order 721.50 Wage Garnishment
58802 SoftChoice 1,846.05 Software
58803 Southern California Water 96.91 Water Use
58804 SBC 136.92 Telephone Services
58805 The Pittsburgh Conference 760.00 Lab Training Registration
58806 Thompson Industrial Supply, Inc. 2,333.18 Mechanical Supplies
58807 Time Warner Communications 40.47 Cable Services
58808 United Way 305.00 Employee Contributions
58809 Verizon California 861.05 Telephone Services
58810 Weather Services International 339.00 Software Maint.-Weather for Windows
58811 Court Order 597.50 Wage Garnishment
58812 Thomas M. Blanda 274.50 Meeting[Training Expense Reimbursement
58813 County of Orange 43.00 Annexation Fee
58814 CAPPO Conference Registration 300.00 Purchasing Meeting Registration
58815 Dynamic Fabrication, Inc. 36,470.68 Auger Frame&Hopper Assemblies
6nI210nc EXHIBIT A
H:\dept\6n\EXCEL.dta\220%PSHARE\Claims Paid Report\03-04\Claims Paid Report-011504.)ds Page 1 of 6 2/1312004
Claims Paid From 01/01/04 to 01/15/04
Warrant No. Vendor Amount Description
58816 AKM Consulting Engineers 68,319.80 Professional Services 7-36,7-39, 7-41 -Trunk Sewer Improvements
58817 Black&Veatch Corporation 95,353.94 Engineering Services J-77,J-87&J-71-3
58818 Blue Cross of California 319,164.37 Medical Insurance Premium
58819 Boyle Engineering Corporation 87,299.16 Engineering Services 1-2-4
58820 Brown&Caldwell 40,164.00 Prof.Serv.-Needs Assessment Study&O&M Standard Oper.Proc.Manual
58821 California Soil Products 119,891.00 Residuals Removal MO 3-29-95
58822 Delta Dental 56,613.06 Dental Insurance Plan
58823 J R Filanc Construction 30,532.53 Construction-Valve Replacement at Yorba Linda,West Side&Rocky Point
58824 Kaiser Foundation Health Plan 51,496.41 Medical Insurance Premium
58825 Kemiron Pacific, Inc. 139,074.45 Ferric Chloride MO 9-27-95
58826 Kforce, Inc. 37,468.44 Temporary Employment Services
58827 Lee&Ro, Inc. 54,481.06 Professional Services 5-43-1,5-51 &5-52
58828 LECO Corporation 176,288.70 Gas Chromatograph with Time-of-Flight Mass Spectrometer
58829 Malcolm Pimie, Inc. 27,653.48 Professional Services J-79
58830 Orange County Water District 1,255,809.49 Joint GWRS Project J-36
58831 Parsons, Inc. 381,977.84 Engineering Services J-35-1
58832 Pioneer Americas, Inc. 197,998.02 Sodium Hypochlorite
58833 So.Cal. Gas Company 25,426.90 Natural Gas
58834 St Croix Sensory, Inc. 34,356.21 Olfactory Measurement Equipment,Software,Training&Supplemental Equipment
58835 Tule Ranch/Magan Farms 131,562.91 Residuals Removal MO 3-29-95
58836 U.S. Peroxide, L.L.C. 204,924.53 Odor&Corrosion Control for Coll.Sys.;Hydrogen Peroxide&Ferrous Chloride
58837 Villalobos&Associates 25,660.50 Prof.Serv.-Corrosion Management &P-2 Digester Gas Line Evaluation
58838 ARB, Inc. 362,732.86 Construction 11-22
58839 Cora Constructors 44,730.00 Construction 7-7-2
58840 J F Shea Construction, Inc. 422,896.65 Construction J-71-3,J-35-2&P2-85
58841 J R Filanc Construction 1,144,312.01 Construction P1-76
58842 Margate Construction, Inc. 1,351,976.00 Construction P1-37
58843 Morrow-Meadows Corp. 26,432.00 Construction P2-47-3
58844 Southern Contracting Company 36,173.00 Construction J-33-1A
58845 Orange County Sanitation District 38,862.99 Worker's Comp. Reimb.
58846 Abatix Environmental Corp. 227.30 Hardware
58847 Agilent Technologies, Inc. 357.41 Lab Parts&Supplies
58848 Air&Waste Management Assoc. 150.00 Membership
58849 Alhambra Foundry Co., Ltd. 4,202.25 Manhole Frames&Covers
58850 American Fildelity Assurance Company 66.00 Voluntary Cancer Insurance
58851 AMEC Earth&Environmental 150.00 Lab Supplies
58852 AMSA 10.50 Source Control Meeting Registration
58853 AT&T Wireless Services 2,869.63 Wireless Phone Services
58854 Baker Tanks 560.00 Tank Rentals
58855 BioMerieux Vitek, Inc. 1,078.86 Lab Supplies
58856 Borthwick,Guy,Bettenhausen 3,455.32 Professional Services P2-84
58857 Bush&Associates, Inc. 7,294.00 Surveying Services,J-77, 11-22&P1-76
58858 BEC-Building Electronic Controls, Inc. 2,400.00 Fire Alarm System Maintenance Program Quarterly Inspection
58859 California Automatic Gate 782.19 Automatic Gate Maintenance-Both Plants
58860 California Relocation Services, Inc. 806.25 File Moving/Relocation Services
r;r,r21onc EXHIBIT A, b
Page 2 of 6 `H:kleptlfnlEXCEL.dta12201APSHARE1Claims Paid Report103.041CIaims Paid Report-011504.)ds g 2/13I2004
Claims Paid From 01/01104 to 01/15/04
Warrant No. Vendor Amount Description
58861 Carl Warren&Co. 816.48 Insurance Claims Administrator
58862 Carollo Engineers 23,234.37 Professional Services P2-60&Microfiltration Demonstration Project
58863 Cingular Wireless Equipment 2,278.03 Tax on Free Telephone Equipment
58864 Coast Rubber Stamp Mfg. 153.77 Office Supplies
58865 Columbia Analytical Services,Inc. 2,315.00 Analysis of Wastewater,Industrial Wastewater&Biosolids
58866 Computer Sciences Corp. 5,687.89 Consulting&Lab Services-Assay Pilot Project
58867 Consolidated Elect. Distributors 404.28 Electrical Supplies
58868 Consumers Pipe&Supply Co. 583.70 Plumbing Supplies
58869 Cooper Cameron Corporation 196.56 Engine Supplies
58870 Corporate Express 2,202.18 Office Supplies
58871 Corporate Image Maintenance, Inc. 155.00 Custodial Services Spec.No.9899-09
58872 County of Orange 3,875.55 Maint.Agreement-Repair/Installation of Base, Handheld&Vehicle Radios
58873 County Wholesale Electric Co. 101.56 Electrical Parts&Supplies
58874 Culligan of Orange County 453.20 Maint.Agreement-Cen Gen Water Softener System
58875 CASA 375.00 Communications Meeting Expense
58876 CEPA Company 1,210.00 Lab Equipment Maint.Service
58877 CWEA 1,094.00 Source Control Training Registration
58878 David's Tree Service 2,755.00 Tree Maint. Service
58879 Dell Direct Sales, L.P. 10,647.86 (4)Dell Latitude Notebook Computers
58880 Dunn-Edwards Corporation 399.21 Paint Supplies
58881 DGA Consultants, Inc. 8,951.75 Professional Services-CCTV Data Evaluation
58882 E.Sam Jones Distributors, Inc. 803.51 Electrical Supplies
58883 Employee Benefits Specialists, Inc. 250.00 Reimbursed Prepaid Employee Medical&Dependent Care
58884 Employers Group 60.00 Safety&Health Meeting Registration
58885 Enchanter, Inc. 2,700.00 Ocean Monitoring&Ouffall Inspection&Maintenance
58886 Environmental Engineering&Contracting 5.500.00 Professional Services-Fats,Oil&Grease(FOG)Study
58887 Environmental Sampling Supply, Inc. 488,83 Lab Parts&Supplies
58888 FedEx Corporation 473.50 Air Freight
58889 Filarsky&Watt,L.L.P. 142.50 Prof.Services-SPMT Labor Negotiation Meetings&Special Services
58890 First American Real Estate Solutions 647.50 Orange County Property Information
58891 Fisher Scientific Company 4,401.13 Lab Parts&Supplies
58892 Foodcraft Coffee&Refreshment Services 262.05 Meeting Supplies
58893 Franklin Covey 464.59 Office Supplies
58894 Fry's Electronics 325.57 Computer Supplies
58895 Ganahl Lumber Company 2,419.74 Lumber/Hardware
58896 Garratt-Callahan Company 853.38 Chemicals
58897 Grainger, Inc. 6,949.25 Mechanical Parts,Supplies&Tools
58898 Graybar Electric Company 145.75 Electrical Parts&Supplies
58899 Hach c/o Ponton Industries 436.76 Lab Parts&Supplies
58900 Hach Company 442.09 Pump Parts&Supplies
58901 Hill Brothers 22,615.93 Chemicals-Odor&Corrosion Control-Newport Trunkline
58902 Home Depot 275.08 Misc. Repair&Maintenance Material
58903 Hopkins Technical Products 546.83 Mechanical Parts&Supplies
58904 Hub Auto Supply 390.44 Vehicle Parts&Supplies
58905 Industrial Distribution Group 1,451.12 Mechanical Parts&Supplies
fin121011c EXHIBIT A
H:ldeptlfinlEXCEL.dta1220WPSHARE1Claims Paid Report\03.04XClaims Paid Reporl-011504.)ds Page 3 of 6 2/13/2004
Claims Paid From 01/01104 to 01/16104
Warrant No. Vendor Amount Description
58906 Industrial Fabrics Corp. 7,340.00 Mechanical Parts&Supplies
58907 Innedine Engineering 2,075.22 CCTV Videoing of Trunkline Sewers
58908 Interstate Batteries of Cal Coast 938.66 Batteries for Vehicles&Carts
58909 Intratek Computer, Inc. 3,000.00 Network&Server Maintenance
58910 Ionics Instrument Business Group 105.00 Lab Supplies
58911 Iron Mountain Off-Site Data Protection 310.00 Offsite Back-Up Tape Storage for NT Server
58912 IECOC 50.00 Membership(Industrial Environmental Coalition of Orange County)
58913 J F Shea Construction, Inc. 4,471.00 Construction-Plant 2 Junction Box#4 Repairs
58914 Jamison Engineering Contractors, Inc. 7,751.70 Inspect. &Maint.-District's#5 Gates and Preventative Flap Gate Maint.at Pit. 1
58915 Jay's Catering 1,897.37 Meeting Expenses
58916 Johnstone Supply 48.61 Mechanical Supplies
58917 JC Penny Co., Inc. 5,923.09 Reconciliation User Fee Refund Program
58918 KW Communications 1,460.00 Community Outreach Re Bushard Trunkline Replacement Project
58919 L&N Uniform Supply Co. 28.80 Uniform Rentals
58920 League Of CA Cities 120.00 Publication
58921 Lifecom-Safety,Inc. 295.00 Instrument Calibration
58922 Lucci's Gourmet Foods, Inc. 95.19 Meeting Expense
58923 LINJER 10,010.62 Professional Service-DART MO 9-22-99
58924 Mandic Motors 91.00 Towing Services
58925 McMaster-Carr Supply Co. 53.87 Tools
58926 Mec Analytical System 12,181.00 Toxicity Analysis
58927 Medlin Controls Co. 1,341.65 Instrument Supplies
58928 Mission Abrasive&Janitorial Supplies 41.59 Janitorial Supplies
58929 Mission Uniform Service 157.04 Uniform Rentals
58930 MBC Applied Environmental Sciences 1,420.00 Lab Analyses
58931 National Plant Services, Inc. 6,900.00 Vacuum Truck Services
58932 NetVersant of Southern California 3,217.60 Security System Maintenance
58933 Nu-Way Laser Engraving 76.80 Steel Tags
58934 NASSCO/PACP 1,500.00 Air Quality Training Registration
58935 Office Depot Business Services Div. 1,280.50 Office Supplies
58936 OneSource Distributors, Inc. 5.68 Electrical Parts&Supplies
58937 Orange County Hose Company 127.87 Hydraulic Hose Supplies&Parts
58938 Orange Courier 98.50 Courier Services
58939 Ortiz Fire Protection 360.00 Fire System Maintenance& Repair Services
58940 Oxygen Service Company 1,485.07 Specialty Gases
58941 OCB Reprographics 689.15 Printing Service-MO 1/26/00
58942 P.L. Hawn Company, Inc. 328.94 Electrical Supplies
58943 Pacific Bell Internet Services 328.79 Internet Service
58944 Pacific Investment Management Co. 19,190.00 Investment Management Service Res.95-97
58945 Pacific Parts&Controls 4,496.96 Electrical Parts&Supplies
58946 Parker Hannifin Corporation 178.35 Mechanical Parts&Supplies
58947 Partners Consulting Services 24,840.00 FIS On-Site Support-One World XE Migration Project
58948 Pixelpushers, Inc. 17,000.00 Prof.Serv.-Design, Implement, Construct&Install a Corporate Intranet Site
58949 Ponton Industries, Inc. 3,521.20 Instrument Parts&Supplies
58950 Praxair Distribution, Inc. 14.95 Demurrage
finv210nc EXHIBIT A '-
H:ldeptlfinT=XCEL.dta12201APSHARE1Claims Paid ReportW-041CIaims Paid Report-011504.)ds Page 4 of 6 211=00'q
Claims Paid From 01/01/04 to 01/15/04
Warrant No. Vendor Amount Description
58951 Pre-Paid Legal Services, Inc. 463.45 Employee Legal Service Insurance Premium
58952 PrinterGuy 2,222.57 Printer Maintenance
58953 Protech Petroleum Services, Inc. 9,462.50 Underground Storage Tank Repairs
58954 Putzmeister 753.01 Mechanical Parts&Supplies
58955 PRSA-Orange County Chapter 75.00 Membership(Public Relations Society of America)
58956 PVF Sales,Inc. 31.05 Plumbing Parts&Supplies
58957 R. L.Abbott&Associates 3,000.00 Kem County Biosolids Consulting Services
58958 R.F.MacDonald Co. 545.00 Analysis Report on Source Testing of Boilers at Pit.2
58959 Rainbow Disposal Co. 2,732.56 Trash Removal
58960 Regents of Univ.of California 4,254.75 Professional Services J-85
58961 Reliastar 9,716.00 Employee Basic Life Insurance
58962 Ricoh Business System 1,745.39 Color Copier Lease
58963 RBF Engineers 10,575.87 Engineering Services 2-24-1
58964 RMS Systems, Inc. 824.00 Software Maint.
58965 RPM Electric Motors 179.04 Motor
58966 Sancon Engineering, Inc. 15,200.00 Repairs&Maint.-Sandblast&Coating Basins"G"&"O"Scum Plates
58967 Schwing America,Inc. 2,995.81 Pump Supplies
58968 Schwing America,Inc.-Training 1,950.00 Mechanical Maintenance Training Registration
58969 Science Applications Intl.,Corp. 22,387.40 Professional Services P-179
58970 Sea-Bird Electronics,Inc. 409.00 Instrument Repairs&Maintenance
58971 Self-Insurance Plans 2,639.42 State Workers'Compensation User Funding&Assessment
58972 Shamrock Supply Co.,Inc. 364.20 Work Bench&Tools
58973 Society for HR Management 160.00 Membership
58974 South Coast Air Quality Management Dist. 442.90 Annual Emission,Operation&Misc. Fees
58975 Southern California Edison 5,200.11 Power
58976 Southern California SETAC 20.00 Membership(So.Calif. Society of Environmental Toxicology&Chemistry)
58977 Southwest Air Balance Corp. 1,415.00 Professional Services P1-37
58978 Spectrum Video,Inc. 1,163.75 Professional Services-Board Room Audio-Visual Design
58979 Sunset Ford 20.18 Auto Parts&Service
58980 Symcas-TSG 1,381.60 SCADA System VAX Service Agreement
58981 Systime Computer Corp 20,265.00 Professional Services-J D Edwards One World XE Support
58982 SC Field Technical Services 3,510.75 Flame Arrestor
58983 South Coast Environmental Co. 9.921.43 Cen Gen Emissions Testing Service
58984 SETAC 120.00 Membership(Society of Environmental Toxicology&Chemistry)
58985 SOCALABPA 160.00 Mech.Maint. Meeting Registration(So.Calif.American Backflow Prevention Assoc.)
58986 Teletrac Inc. 245.00 Monthly Air-Time Service Fee&Software/Hardware Maint. For Vehicle Tracking Sys.
58987 Terminix International Co.#2474 785.00 Pest Control
58988 Thompson Industrial Supply, Inc. 8,269.61 Mechanical Parts&Supplies
58989 ThyssenKrupp Elevator Corporation 115.00 Elevator Maintenance
58990 Tierra Tractor 11,525.00 Tree Planting Services
58991 Time Warner Communication 40.47 Cable Services
58992 The Trane Company 66.17 Electrical Parts&Supplies
58993 Trojan Technologies, Inc. 23,800.50 Professional Services J-40-6
58994 Truck&Auto Supply, Inc. 44.35 Automotive Supplies
58995 Truesdell Laboratories, Inc. 600.00 Analysis of Biosolids and Wastewater
fln/210Ac EXHIBIT A
H:Ideptlfin\EXCEL.dta\2201APSHARE1CIaims Paid Report\03-040aims Paid Report-01150 As Page 5 of 6 2113r2004
Claims Paid From 01101/04 to 01/15/04
Warrant No. Vendor Amount Description
58996 US Filter Corp. 60.00 Service Agreement-Lab Purification System
58997 United Parcel Service 229.25 Parcel Services
58998 The Vantage Group,L.L.C. 12,440.00 Temporary Employment Service
58999 Varian Associates, Inc. 75.20 Lab Parts&Supplies
59000 Verizon California 2,458.92 Telephone Services
59001 Veme's Plumbing 365.00 Service Contract-Testing, Repair&Cert.Backflow Devices
59002 Vision Service Plan-(CA) 9,240.72 Vision Service Premium
59003 V L Systems, Inc. 370.00 Software Maintenance
59004 VWR Scientific Products 1,181.32 Lab Parts&Supplies
59005 The Wackenhut Corporation 14,219,60 Security Guards
59006 The Wall Street Journal 171.32 Subscription
59007 Wastewater Technology Trainers 2,090.00 O&M Training Registration
59008 Water 3 Engineering, Inc. 14,710.19 Engineering Service J-67
59009 WateReuse Association 275.00 Lab Meeting Registration
59010 Wilson Supply, Inc. 616.90 Electrical Parts&Supplies
59011 WEF 1,143.00 Membership-Water Environment Federation
59012 Xerox Corporation 8,973.60 Fax&Copier Leases
59013 Court Order 597.50 Wage Garnishment
59014 Yokogawa Corp.of America 5,224.49 Instrument Supplies
59015 Adams/Mallory Construction Co.,Inc. 19,524.46 Construction P2-79-1
59016 California Bank&Trust 4,019.00 Construction J-33-1A, Retention
59017 Hardat S. Khublall 159.56 Meeting/Training Expense Reimbursement
59018 Charles D. McGee 127.00 Meeting/Training Expense Reimbursement
59019 Patrick A. Sullivan 72.00 Meeting/Training Expense Reimbursement
59020 Jonathan K.Thomsic 154.50 Meeting/Training Expense Reimbursement
59021 Crawford,George 1,362.96 Employee Computer Loan Program
59022 CAPPO Conference Registration 600.00 Purchasing Meeting Registration
59023 DMG-Maximus 10,000.00 Professional Services-Cost Allocation Plan
59024 Court Order 445.00 Wage Garnishment
Total Accounts Payable-Warrants $ 8,523,654.48
Payroll Disbursements
32703-32810 Employee Paychecks $ 164,297.07 Biweekly Payroll 01/07/04
32811 -32817 Employee Paychecks 24,551.84 Payroll Adjustments&Retiree Payments
32818-32957 Employee Paychecks 158,458.34 Vacation&Leave Overaccrual Payouts, EMT Payouts&Adjustments
32158-32674 Direct Deposit Statements 967,799.71 Biweekly Payroll 01/07/04
Total Payroll Disbursements $ 1,315,106.96
Wire Transfer Payments
JP Morgan Chase Bank $ 124,045.80 Societe Generale November Swap Payment on 1993 Certificates of Participation
JP Morgan Chase Bank 37,321.90 December Interest Payment on 1993 Certificates of Participation
Total Wire Transfer Payments $ 161,367.70
Total Claims Paid 01/01/04-01/15/04 $10,000,129.14
fin/210Ac EXHIBIT A
H:1dep11fin1EXCEL.dta%22044PSHARE1CIaims Paid Reportl03-040aims Paid Report-011504.)ds Page 6 of 6 2/13/2004
� P
Claims Paid From 01/16104 to 01131/04
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
59025 City of Seal Beach $ 278,218.00 Cooperative Projects-City of Seal Beach
59026 Orange County Sanitation District 791,042.23 Payroll EFT Reimbursement
59027 Airgas Safety,Inc. 7,792.10 Safety Supplies&Equipment
59028 American Express 24,982.61 Purchasing Card Program,Misc.Supplies&Services
59029 American Telephone&Telegraph Corp. 251.78 Telephone Service
59030 Bell Pipe&Supply Co. 72.97 Mechanical Parts&Supplies
59031 Boutwell,Fay&Fabricant,L.L.P. 1,664.50 Legal Services-401a Plan
59032 City of Tustin 1,157.73 Water Use
59033 Voided Check - -
59034 Consolidated Elect.Distributors,Inc. 81.43 Mechanical Parts&Supplies
59035 Consumers Pipe&Supply Co. 268.36 Plumbing Supplies
59036 Court Trustee 69.12 Wage Garnishment
59037 CASA 1,500.00 General Management Meeting Registration
59038 Employee Benefits Specialists,Inc. 9,488.58 Reimbursed Prepaid Employee Medical&Dependent Care
59039 Franchise Tax Board 100.00 Wage Garnishment
59040 The Holman Group 910.44 Employee Assistance Program Premium
59041 City of Huntington Beach 20,169.77 Water Use
59042 Insight Investments 750.00 Software Consulting-NetApp Filer
59043 Internal Revenue Service 500.00 Wage Garnishment
59044 Intl. Union of Oper. Eng.AFL-CIO Local 501 3,763.87 Dues Deduction
59045 Irvine Ranch Water District 3.65 Water Use
59046 James F.McConnell 1,750.00 OCSD Share of 2004 O.C.Congressional Water Res. Lunch-2/25/04 Wash.,D.C.
59047 McMaster-Carr Supply Co. 179.04 Mechanical Parts&Supplies
59048 Midway Mfg&Machining Co. 8,925.00 Mechanical Parts&Supplies
59049 National Bond&Trust 2,108.91 U.S.Savings Bonds Payroll Deductions
59050 Oracle Corporation 2,914.44 Software Support
59051 Orange County Sheriff 385.11 Wage Garnishment
59052 Orange Fluid System Technologies,Inc. 61.02 Plumbing Parts&Supplies
59053 OCEA 589.36 Dues Deduction
59054 Pacific BellMforldCom 15.18 Telephone Service
59055 Court Order 40.00 Wage Garnishment
59056 Court Order 296.00 Wage Garnishment
59057 Peace Officers Council of CA 1,575.00 Dues Deduction
59058 Prudential Insurance Company of America 2,490.55 Employee Long-Term Care Insurance
59059 Court Order 721.50 Wage Garnishment
59060 So.Cal.Gas Company 4,064.48 Natural Gas
59061 Southern California Edison 17,175.16 Power
59062 Southern California Edison 1,781.21 Power
59063 State Board of Equalization 195.32 Underground Petroleum Storage Tank Fee
59064 SBC 33.83 Telephone Services
59065 United Way 305.00 Employee Contributions
59066 Verizon California 3,098.54 Telephone Services
59067 Michael A.Berdis 440.00 Meet!ng/Training Expense Reimbursement
59068 Ronald C.Cortez 440.00 Meeting/Training Expense Reimbursement
59069 Tyler T. Hoang 440.00 Meeting/Training Expense Reimbursement
59070 Vincent S. Lockyer 195.00 Meeting/Training Expense Reimbursement
59071 Denise M.Martinez 215.00 Meeting/Training Expense Reimbursement
59072 Cynthia A.O'Neil 134.71 Meeting/Training Expense Reimbursement
H:WeptUnlEXCEL.dta1220%PSHARE1Claims Paid Report103-041Claims Paid Report-013104.)ds EXHIBIT B
fin/210RC Page 1 of 8 2/17/2004
Claims Paid From 01116104 to 01/31/04
Warrant No. Vendor Amount Description
59073 Rodney K.Petersen 230.00 Meeting/Training Expense Reimbursement
59074 Ddaze Phuong 170.00 Meeting/Training Expense Reimbursement
59075 Wiliam F.Pierce 152.00 Meeting/Training Expense Reimbursement
59076 Rita Riccardo 130.00 Meeting/Training Expense Reimbursement
59077 Curt V.Shelp 195.00 Meeting/Training Expense Reimbursement
59078 Patrick A.Sullivan 72.00 Meeting/Training Expense Reimbursement
59079 Mercury Insurance As Subrogee 3,928.73 Claim Settlement-Vehicle Accident
59080 Wlcox,Robyn 1,500.00 Employee Computer Loan Program
59081 Court Order 150.00 Wage Garnishment
59082 Court Order 602.50 Wage Garnishment
59083 Court Order 445.00 Wage Garnishment
59084 Air Products&Chemicals,Inc. 26,294.06 O&M Agreement Oxy Gen Sys MO 8-8-89
59085 ADS Environmental Services,Inc. 169,774.53 Professional Services-J-73-2
59086 Black&Veatch Corporation 99.285.95 Eng.Svrs.P1-76,J-71-3,P2-85&Pit.2 Hydrogen Peroxide Facility Modifications
59087 Boyle Engineering Corporation 96,571.47 Engineering Services 1-2-4
59088 Brown&Caldwell 41,171.40 Professional Services P1-37
59089 California Soil Products 27,660.93 Residuals Removal MO 3-29-95
59090 Carollo Engineers 570,441.90 Professional Services P2-66
59091 City of Fountain Valley 29,597.98 Water Use
59092 Coral Energy Resources,L.P. 127,289.29 Natural Gas
59093 CH2MHill 143,800.74 Professional Services J40-7
59094 Environmental Science Associate 32,710.94 Professional Services J-40-5
59095 Insight Investments 28,590.39 Computer Hardware-Network Appliance File Sharing Device
59096 Irvine Technology Corporation 31,419.00 Temporary Employment Services
59097 IPMC c/o Parsons 832,534.00 Professional Services-Integrated Program Management&Temporary Staffing
59098 Jamison Engineering Contractors,Inc. 61,952.46 Install(2)Storage Tanks;Leak Repair;Excavate&Repair Subsidence at Basin 5
59099 Kemiron Pacific,Inc. 137,479.58 Ferric Chloride MO 9-27-95
59100 Lee&Ro,Inc. 52,875.72 Professional Services 5-50,5-54&132-47-3
59101 Malcolm Pirnie,Inc. 58,035.42 Professional Services J-79
59102 Mellon Trust 25,489.38 Investment Custodian Bank
59103 Orange County Water District 134,818.16 GAP Water Use
59104 OCB Reprographics 39,035.62 Printing Service-MO 1126/00
59105 Pioneer Americas,Inc. 151,260.82 Sodium Hypochlorite
59106 Polydyne,Inc. 94,095.92 Cationic Polymer MO 3-11-92
59107 Sancon Engineering,Inc. 34,730.00 Construction-Manhole Rehabilitation Program
59108 Science Applications Intl.,Corp. 62,598.79 Ocean Monitoring MO 6-8-94
59109 SoftChoice 101,664.17 Microsoft Enterprise License Renewal
59110 Southern California Edison 71,119.69 Power
59111 Synagro Technologies,Inc. 559,070.38 Residuals Removal MO 3-29-95
59112 Tetra Tech,Inc. 108,587.10 Professional Services 11-22,7-37&J-90
59113 Trusecure Corporation 33,995.00 Website Security
59114 Tule Ranch/Magan Farms 235,466.33 Residuals Removal MO 3-29-95
59115 Woodruff,Spradlin&Smart 86,717.57 Legal Services MO 7-26-95
59116 ARB,Inc. 235,928.77 Construction 11-22
59117 Steve P Rados,Inc. 238,233.60 Construction 1-2-4
59118 Union Bank of California 26,470.40 Construction 1-2-4,Retention
59119 eSysTek 720.00 Software Program Consulting-SMS Implementation
59120 Aanderaa Instruments 3,811.08 Coastal Monitoring Buoy Data Storage Units
59121 Airborne Express 30.50 Air Freight
H:WeptUnIEXCEL.dta1220WPSHARE1Claims Paid Report103-MClaims Paid Report-013104As EXHIBIT B
fW21011c Page 2 of 8 2117120D4
Claims Paid From 01/16/04 to 01/31/04
Warrant No. Vendor Amount Description
59122 Airgas-West 6.82 Demurrage
59123 Airgas Safety,Inc. 5,865.89 Safety Supplies&Equipment
59124 American Seal&Packing 71.72 Packing Materials&Supplies
59125 American Seals West 1,634.26 Mechanical Parts&Supplies
59126 Appleone Employment Service 2,254.48 Temporary Employment Services
59127 Applied Ocean Sciences 15,360.00 Professional Services J-85-Naval Post Graduate School
59128 Aquarium Doctor 105.44 Human Resources Aquarium Service
59129 Arch Wireless 1,358.68 Airtime,Service&Equipment
59130 Ashbrook Corporation 601.94 Mechanical Parts&Supplies
59131 AMEC Earth&Environmental 150.00 Toxicity Analyses
59132 ARK Technologies 4,216.00 Data Processing
59133 ASAE 395.00 Compilance Training Registration
59134 American Telephone&Telegraph Corp. 417.19 Telephone Service
59135 Baker Tanks 571.20 Tank Rentals
59136 Bar Tech Telecom,Incorporated 2,155.23 Telephone Equipment
59137 Basic Chemical Solutions,L.L.C. 10,035.06 Sodium Hydroxide&Sodium Bisulfite
59138 Battery Specialties 1,369.68 Batteries
59139 Brenner-Fiedler&Assoc,Inc. 1,078.69 Compressor
59140 Bush&Associates,Inc. 3,212.00 Surveying Services MO 6-25-97
59141 Caltrol,Inc. 400.00 Repairs&Maintenance Service
59142 Cameron Environmental,Inc. 3,250.75 Maintenance Service-Scrubber Activated Carbon Replacement
59143 Cardlock Fuel Systems,Inc. 1,861.85 Fueling District Vehicles at Local Gas Stations
59144 Ce112Cell 16.15 Phones&Accessories
59145 Center for Creative Growth 4,600.00 Professional Services-O&M Management Coaching
59146 Charles P.Crowley Co. 1,917.53 Mechanical Parts&Supplies
59147 Charts,Inc. 200.89 Office Supplies
59148 Coastal Training Technologies 732.44 Videos
59149 Conex International 55.00 Professional Services P2-60
59150 Consolidated Elect.Distributors,Inc. 3,255.02 Electrical Supplies
59151 Consumers Pipe&Supply Co. 1,948.68 Plumbing Supplies
59152 Corporate Express 3,459.49 Office Supplies
59153 Cost Containment Solutions 1,502.90 Worker's Comp.Services
59154 County of Orange 1,702.35 Maint.Agreement-Repair/Installation of Base,Handheld&Vehicle Radios
59155 County of Orange-Auditor Controller 70,00 Encroachment Permit
59156 County of Orange-Auditor Controller 10,433.00 Underground Storage Tank,Hazardous Material,&State Fees
59157 County Wholesale Electric Co. 1,584.24 Electrical Parts&Supplies
59158 Culligan of Orange County 37.50 Maint.Agreement-Cen Gen Water Softener System
59159 CASA 275.00 Compliance Training Registration
59160 CEM Corporation 1,098.64 Lab Parts&Supplies
59161 CISCO Systems 800.00 Software Maint.Agreement
59162 CR&R,Inc. 1,890.00 Container Rentals
59163 County Sanitation District No.70 3,230.00 Olfactometry Lab Expense
59164 CWEA Membership 194.00 Membership-Calif.Water Environment Assoc.
59165 David's Tree Service 3,600.00 Tree Maint.Service
59166 Del Mar Analytical 1,562.00 Analysis of Biosolids and Wastewater
59167 Delta Packaging Products,Inc. 149.64 Lab Supplies
59168 DigiPhoto 6.10 Photographic Services
59169 Duhig&Company,Inc. 991.73 Instrument Supplies
59170 Dunn-Edwards Corporation 84.30 Paint Supplies
H:klept%fin\EXCEL.dta12201APSHARE%Claims Paid Report103-041Claims Paid Report-013104.)ds EXHIBIT B
W210nc Page 3 of 8 2/17/2004
Claims Paid From 01116104 to 01131/04
Warrant No. Vendor Amount Description
59171 DIRECTV 364.00 Subscription
59172 E.Sam Jones Distributors,Inc. 927.40 Electrical Supplies
59173 Eberhard Equipment 582.71 Mechanical Parts&Supplies
59174 Electra-Bond,Inc. 1,212.19 Fusion Bond&Epoxy Coating Services
59175 Elsevier Science 1,149.00 Subscription
59176 Emilio Ariston&Law Offices of 12,500.00 Claim Settlement-District Personnel
59177 Enchanter,Inc. 7,200.00 Ocean Monitoring&Outfall Inspection&Maintenance
59178 Enecon Corporation 7,500.00 Repair&Maintenance Service-(3)Hole/Leaks at Gas Compressor Bldg.
59179 Entech Instruments,Inc. 2.980.10 Lab Parts&Supplies
59180 Environmental Microbiology Consulting 6,630.00 Professional Services J-40-6
59181 Environmental Resource Association 1,432.90 Lab Supplies
59182 Environmental Sampling Supply,Inc. 487.63 Lab Supplies
59183 Eurotherm Group Companies 1,607.25 Inst. Parts&Supplies
59184 Ewing Irrigation Industrial 829.96 Plumbing Parts&Supplies
59185 F H Pumps, Inc. 1,297.57 Pump Supplies
59186 FedEx Corporation 91,70 Air Freight
59187 First American Real Estate Solutions 647.50 Orange County Property Information
59188 Fisher Scientific Company, L.L.C. 5,139.67 Lab Supplies
59189 Fluor Enterprises,Inc. 11,273.62 Professional Services-Electrical Equipment Refurbishment
59190 Foodcraft Coffee&Refreshment Services 493.43 Meeting Supplies
59191 Fortis Benefits Insurance Company 4,579.90 Long-Term&Short-Term Disability Ins.Premium
59192 Fountain Valley Paints,Inc. 463.65 Paint Supplies
59193 Fountain Valley Rancho Hand Wash 1,269.43 Truck Wash Tickets&Unleaded Gasoline
59194 Franklin Covey 192.83 Office Supplies
59195 Fry's Electronics 694.92 Computer Supplies
59196 Full Spectrum Analytics 1,664.00 Maintenance&Repairs-Vacuum Pumps
59197 Ganahl Lumber Company 443.39 Lumber/Hardware
59198 Garland Manufacturing Co. 1,536.00 Mechanical Parts&Supplies
59199 Garratt-Callahan Company 105.00 Chemicals
59200 George T.Hall 538.75 Electrical Supplies
59201 George Yardley Co. 334.03 Mechanical Parts&Supplies
59202 Gerhardt's, Inc. 7,840.75 Engine Supplies
59203 Getinge Castle 1,009.10 Lab Supplies
59204 Gierlich-Mitchell, Inc. 20,392.81 Mechanical Parts&Supplies
59205 Golden State Controls 379.80 Instrument Parts&Supplies
59206 Grainger,Inc. 6,300.17 Instrument Parts&Supplies
59207 Graybar Electric Company 281.91 Electrical Parts&Supplies
59208 Great Western Sanitary Supplies 1,106.89 Janitorial Supplies
59209 Guarantee Records Management 173.17 Off-Site Records Storage
59210 Hach c/o Ponton Industries 4,801.80 Lab Parts&Supplies
59211 Harold Primrose Ice 129.50 Ice For Samples
59212 Harrington Industrial Plastics,Inc. 589.08 Plumbing Supplies
59213 Herb's Blackforest Bakery&Deli 54.20 Meeting Expenses
59214 Hill Brothers 17,877.31 Chemicals-Odor&Corrosion Control-Newport Trunkline
59215 Home Depot 569.94 Misc.Repair&Maintenance Material
59216 Horizon Technology 1.436.46 Lab Supplies
59217 HydraBaths 4,388.06 Reconciliation User Fee Refund Program
59218 Hydrotex 1,002.41 Gasoline&Lubricants
59219 Idexx 2,672.20 Lab Supplies
H:ldeptlfinlEXCEL.dta12201APSHARE1Claims Paid Report103-041Claims Paid Report-013104.)ds EXHIBIT
rnr210no Page 4 of 8 2117v2004
Claims Paid From 01116104 to 01131104
Warrant No. Vendor Amount Description
59220 Industrial Distribution Group 3,310.64 Mechanical Parts&Supplies
59221 Information Resources 905.00 Human Resources Service-Background Checks
59222 Inorganic Ventures,Inc. 725.04 Lab Parts&Supplies
59223 Invensys Systems,Inc. 3,018.64 Instrument Supplies
59224 Iron Mountain 86.06 Bid Document Storage Fees P1-37&J-39
59225 Iron Mountain Off-Site Data Protection 272.50 Offsite Back-Up Tape Storage for NT Server
59226 Irvine Pipe&Supply 1,212.04 Mechanical Parts&Supplies
59227 Irvine Ranch Water District 43.13 Water Use
59228 ICBO-International Council of Building 540.00 Publication
59229 J&B Auto Parts 216.10 Auto Parts&Supplies
59230 J.G.Tucker and Son,Inc. 283.60 Tool Chests
59231 Jay's Catering 399.37 Meeting Expenses
59232 Joe Rhodes Maintenance Services,Inc. 122.50 Maint.Agreement-OCSD Fuel Management System
59233 Johnstone Supply 725.09 Electrical Supplies
59234 K.P.Lindstrom,Inc. 3,720.00 Environmental Consulting Services MO 12-9-90
59235 Kforce Professional Staffing 1,069.20 Temporary Employment Services
59236 Kienow Associates,Inc. 8,760.67 Legal Services 1-2-4
59237 KNF Neuberger,Inc. 2,083.52 Lab Parts&Supplies
59238 Lab Support 18,944.79 Temporary Employment Services
59239 Labware,Inc. 1,600.00 Lab Meeting Registration
59240 Law Journal Press 281.05 Publication
59241 Lexis-Nexis 85.99 Books&Publications
59242 Lifecom-Safety,Inc. 80.00 Instrument Calibration Services
59243 Lucci's Gourmet Foods,Inc. 175.50 Meeting Expense
59244 David A. Ludwin 200.00 Engineering Meeting Registration
59245 LINJER 9,870.03 Professional Service-DART MO 9-22-99
59246 Julie A.Matsumoto 371.63 Meeting[Training Expense Reimbursement
59247 McGarry Central 144.52 Office Equipment Maintenance Agreement
59248 McMaster-Carr Supply Co. 2,068.15 Mechanical Parts&Supplies
59249 Measurement Control Systems,Inc. 1,975.45 Repair&Calibration Services
59250 Mechanical Seal Repair,Inc. 37.71 Mechanical Seal
59251 Mini Mailers,Inc. 3,844.21 Mailing Services
59252 Mission Abrasive&Janitorial Supplies 41.59 Janitorial Supplies
59253 Mission Uniform Service 4,194.68 Uniform Rentals
59254 Morton Salt 598.73 Salt
59255 MotorTech USA,Inc. 2,160.29 Mechanical Parts&Supplies
59256 MCR Technologies,Inc. 1,760.87 Instrument Parts&Supplies
59257 National Plant Services,Inc. 440.00 Vacuum Truck Services
59258 Neal Supply Co. 753.97 Plumbing Supplies
59259 New Horizons CLC of Santa Ana 480.00 Information Technology&Lab Training Registration
59260 The Norco Companies 178.78 Mail Delivery Service
59261 Nu-Way Laser Engraving 396.35 Steel Tags
59262 NACE International 560.00 Air Quality Meeting Registration
59263 O.C.Windustrial Co. 78.23 Mechanical Parts&Supplies
59264 Office Depot Business Services Div. 809.25 Office Supplies
59265 OneSource Distributors,Inc. 606.79 Electrical Parts&Supplies
59266 Optio Software,Inc. 4,945.73 Software Maintenance Agreement
59267 Orange County Hose Company 42.02 Hydraulic Hose Supplies&Parts
59268 Orange County Vector Control District 28.66 Pest Control
H:\depflrin\EXCEL.dta\220WPSHARE\Claims Paid Report103-041Claims Paid Report-013104.)ds EXHIBIT B
fin/210Ac Page 5 of 8 2/17n004
Claims Paid From 01/16/04 to 01/31/04
Warrant No. Vendor Amount Description
59269 Oxygen Service Company 2,986.53 Courier Service to Contract Labs&Specialty Gases
59270 OCDM Marketing 403.05 Processing Fees-Public Notice Mailing&Postage
59271 P.L. Hawn Company,Inc. 385.90 Electrical Supplies
59272 Pacific Bell Internet Services 324.00 Internet Service
59273 Pacific Coast Tools 183.99 Tools
59274 Pacific Institute 50.00 Membership
59275 Pacific Mechanical Supply 1,091.36 Plumbing Supplies
59276 Parker Hannifin Corporation 762.15 Mechanical Parts&Supplies
59277 Parker Supply Company 2,630.16 Mechanical Parts&Supplies
59278 Parts Unlimited 95.81 Truck Supplies
59279 Paul Cockrell Photography 499.88 Photographic Services-Construction Projects
59280 PenValve 443.27 Mechanical Parts&Supplies
59281 Petroleum Engineering,Inc. 1,610.00 Repair&Maintenance Services-Spill Bucket
59282 Plumbers Depot,Inc. 614.95 Plumbing Supplies
59283 Port Supply 95.51 Pump
59284 Power Design 861.07 Electrical Supplies
59285 Praxair,Inc. 160.01 Lab Parts&Supplies
59286 Primary Source Office Furnishings,Inc. 1,084.88 Office Furniture
59287 Process Equipment Company 24,550.84 Goulds Pump
59288 Project Management Institute 295.00 Publication on CD
59289 Public Resources Advisory Group 7,500.00 Financial Advisory Services
59290 Pumping Solutions,Inc. 1,611.33 Pump&Pump Supplies
59291 PARMA 475.00 Accounting Meeting Registration
59292 PCS Express,Inc. 298.02 Courier Service
59293 PVF Sales, Inc. 1,772.40 Plumbing Parts&Supplies
59294 Rainbow Disposal Co. 361.28 Trash Removal
59295 Reliastar Bankers Security Life Ins. 9.892.46 Employee Life Ins.Premium,Short-Term Disability&Cancer Ins.Payroll Deductions
59296 RemedyTemp,Inc. 561.13 Temporary Employment Services
59297 Robicon Corporation 1,257.35 Repair&Maintenance Services for Robicon Drives
59298 Rosemount Analytical,Inc. 10,645.23 Instrument-Oxygen Analyzer
59299 Ryan Herco Products Corp. 32.28 Pump Supplies
59300 RCL&Associates, Inc. 8,937.86 Instrument-Nox Analyzer
59301 RPM Electric Motors 636.10 Motor
59302 S. P. Kinney Engineers,Inc. 217.19 Mechanical Parts&Supplies
59303 Sanmina Corporation 597.87 Reconciliation User Fee Refund Program
59304 Scott Specialty Gases,Inc. 111.18 Carrying Cases for Calibration Gas Bottles
59305 Scoltel Voice&Data,Inc. 2,284.80 Telephone System Maintenance
59306 City of Seal Beach Finance Dept. 190.16 Water Use
59307 Seton Name Plate Corp 740.72 Traffic Safety Signs
59308 Sewer Equipment Company of America 293.41 Mechanical Parts&Supplies
59309 Shamrock Supply Co.,Inc. 668.59 Tool Box
59310 Shureluck Sales&Engineering 1,045.96 Mechanical Parts&Supplies
59311 Sigma-Aldrich,Inc. 1,296.72 Lab Parts&Supplies
59312 Smith-Emery Company 2,191.00 Soils,Concrete&Other Materials Testing
59313 Southern California Edison 25.86 Power
59314 Southern California Material Handling 16,928.24 Caterpillar Forklift Truck&Accessories
59315 Southern Counties Lubricants 1,588.97 Industrial Oil
59316 Sparkletts 1,635.80 Drinking Water/Cooler Rentals
59317 Stanley Steamer International,Inc. 388.65 Carpet Cleaning Services
H:ldepMn\EXCEL.dta52201APSHARE1Claims Paid Report103.0410aims Paid Report-013104.)ds EXHIBIT e\
enrzlonc Page 6 of 8 2n712004
Claims Paid From 01/16104 to 01/31/04
Warrant No. Vendor Amount Description
59318 State Water Resources Control Board 593.00 Annual NPDES Permit Fee-7-36
59319 Summit Steel 735.22 Metal
59320 Sunset Industrial Parts 961.49 Mechanical Supplies
59321 Systime Computer Corp 16.800.00 Professional Services-J D Edwards One World XE Support
59322 SBC 968.00 Telephone Services
59323 South Coast Environmental Co. 19,264.14 Cen Gen Emissions Testing Service
59324 SKC-West,Inc. 280.15 Lab Parts&Supplies
59325 SPEC Services, Inc. 12.637.88 Engineering Services J-33-1
59326 SPX Valves&Control 7.152.75 Mechanical Parts&Supplies
59327 Taylor-Dunn 156.10 Electric Cart Parts
59328 Team Scopellite Co. 12,592.80 Professional Services-Relocation of Liquid Gas In Lab
59329 Telelrac Inc. 245.00 Monthly Air-Time Service Fee&Software/Hardware Maint.For Vehicle Tracking Sys.
59330 Terminix International 305.00 Pest Control
59331 The Walking Man,Inc. 750.00 Construction Notice Distribution-Bushard Trunk Sewer Replacement
59332 Thompson Industrial Supply,Inc. 4,820.11 Mechanical Parts&Supplies
59333 Times Community News 100.00 Notices&Ads
59334 Todd Painting,Inc. 3.720.00 Painting Services-Building A Doors
59335 Townsend Public Affairs 5,000.00 Legislative&Executive Advocate for Grant Funding
59336 Tropical Plaza Nursery,Inc. 11,861.91 Contract Groundskeeping MO 5-11-94
59337 Troy Systems,Inc. 865.68 Office Supplies
59338 Truck&Auto Supply,Inc. 95.13 Automotive Supplies
59339 Truesdail Laboratories,Inc. 1,920.00 Analysis of Biosolids and Wastewater
59340 Teksystems 16.910.00 Temporary Employment Services
59341 US Filter Corporation 280.00 Service Agreement-Lab Purification System
59342 U S Bank 4,494.05 Annual Administration Fee-1992 Refunding Certificates of Participation
59343 U.S Postal Service(AMS-TMS) 5.000.00 Postage
59344 U.S.Peroxide,L.L.C. 20,187.18 Hydrogen Peroxide
59345 Ultra Scientific 591.83 Lab Parts&Supplies
59346 Union Bank of California 1,330.05 Banking Services
59347 United Parcel Service 819.92 Parcel Services
59348 United States Treasury 18,602.65 Professional Services J-85-Naval Post Graduate School
59349 Universal Specialties,Inc. 4,690.41 Plumbing Parts&Supplies
59350 The Vantage Group, L.L.C. 8,708.00 Temporary Employment Service
59351 Verizon California 3,417.90 Telephone Services
59352 Verne's Plumbing 375.00 Service Contract-Testing&Cert. Backflow Devices at Plts. 1 &2&Pump Sta.
59353 Vossler&Company 1.585.10 Mechanical Supplies
59354 VWR Scientific Products 4,931.71 Lab Parts&Supplies
59355 The Wackenhut Corporation 2,115.92 Security Guards
59356 Wastewater Technology Trainers 495.00 O&M Training Registration
59357 West Coast Safety Supply Co. 2,073.44 Mechanical Parts,Supplies&Tools
59358 WEF 354.00 Membership-Water Environment Federation
59359 WQI 450.00 O&M Training Registration-Water Quality,Inc.
59360 Xerox Corporation 7,877.32 Copier&Fax Leases&Supplies
59361 XESystems,Inc. 825.00 Maintenance Agreement-Xerox Synegix
59362 Chandra R.Johannesson 112.66 Meeting/Training Expense Reimbursement
59363 Rachel J.Parker 160.00 MeetinglTraining Expense Reimbursement
59364 Ddaze Phuong 115.00 Meeting/Training Expense Reimbursement
59365 Juanita M.Skillman 395.00 Meeting/Training Expense Reimbursement
59366 Matthew P.Smith 128.46 Meeting/Training Expense Reimbursement
H:ldeptlrin\EXCEL.dta\2201APSHARE\Claims Paid Report\03-0410aims Paid Report-013104AS EXHIBIT B
tin1210Ac Page 7 of 8 2/1712004
Claims Paid From 01116/04 to 01/31104
Warrant No. Vendor Amount Description
59367 Walter W.Williams 164.00 Meeting/Training Expense Reimbursement
59368 County of Orange-Auditor Controller 975.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
59369 County of Orange-Auditor Controller 1,140.00 Administrative Processing Fee for Supplemental Sewer Fee Adjustments/Cancellations
59370 Hughes Associates,Inc. 7,649.72 Professional Services J-33-1A
59371 Orange County Sanitation District 2,568.66 Petty Cash Reimb.
Total Accounts Payable-Warrants $ 6,681,112.67
Payroll Disbursements
32958-33053 Employee Paychecks $ 155,535.99 Biweekly Payroll 01/21/04
33054-33056 Employee Paychecks 2.990.94 Payroll Adjustments
93565-94073 Direct Deposit Statements 983,069.94 Biweekly Payroll 01/21/04
Total Payroll Disbursements $ 1,141,596.87
Wire Transfer Payments
Union Bank of California $ 6,079,551.09 January Interest Payment on Series 2003AA Certificates of Participation
U.S.Bank 2,560,958.66 January P&I Payment on 1990-92 Advance Refund Certificates of Participation
U.S.Bank $ 176.567.62 January Interest Payment on 2000 Series A&B Certificates of Participation
Total Wire Transfer Payments $ 8,817,077.37
Total Claims Paid 01116/04-01/31104 $ 16,639,786.91
H:ldeptlfin%EXCEL.dta1220%PSHARE1Claims Paid Reportk03-04\Claims Paid Report-013104.)ds EXHIBIT,�
6n/210Ac Page 8 of 8 2/17/2004
BOARD OF DIRECTORS Meeting Date To Bd.of Dir.
2/25/04
AGENDA REPORT Item Number Item Number
9a
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Bob Chenowith, Senior Engineering Associate
SUBJECT: PROPOSED ANNEXATION NO. OCSD-39 — ARONSON ANNEXATION
GENERAL MANAGER'S RECOMMENDATION
(1) Receive and file petition requesting annexation of 1.24 acres to Orange County
Sanitation District (OCSD) in the vicinity of Meads Avenue and Orange Park Boulevard
in an unincorporated area of Orange County; and (2) Adopt Resolution No. OCSD
04-03, authorizing initiation of proceedings to annex said territory to OCSD (Proposed
Annexation No. OCSD-39 — Aronson Annexation).
SUMMARY
• OCSD received a request from Robert Aronson to annex 1 .24 acres to OCSD. This
parcel will be connected to an existing City of Orange sewer on Meads Avenue.
• This parcel will be annexed to the City of Orange. The property owner will build a
five bedroom house.
• The City of Orange will collect the sewer inspection and sewer capacity fees for this
property. This property is in Revenue Area No. 7.
PROJECT/CONTRACT COST SUMMARY
This annexation is in accordance with the terms of the negotiated agreement with the
County of Orange regarding A.B.8 Tax Exchange for annexing properties. The Board of
Directors approved this action and it became effective March 14, 1989. Under this Tax
Exchange, OCSD does not receive a percentage of the basic levy, and instead, collects
a higher annexation fee. The fee of $6,896 includes the following:
LAFCO Processing Fee $ 1 ,150
OCSD Processing Fee 500
State Board of Equalization Processing Fee 350
CA Environmental Quality Act Filing Fee 43
OCSD Annexation Acreage Fee 4 853
TOTAL ANNEXATION FEE $ 6,896
PRIOR COMMITTEE/BOARD ACTIONS
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
Notice of Exemption will be filed.
ATTACHMENTS
1 . Exhibit A Legal Description
2. Exhibit B Map
RLC:sa
lAchenowilh2\Annex.info\AronsonAnnexafion.doc
Revised: 820/01 Page 2
EXHIBIT "A"
1 OCSD-39 Aronson Annexation No. DA 03-27
2 to the Orange County Sanitation District
3
4 That portion of land situated in the Unincorporated Territory of the County of Orange,State of
5 California,being a portion of Parcel 1 and a portion of Meads Avenue,50.00 feet wide,as shown on a Lo
6 Line Adjustment No.LL 79-20,recorded August 6, 1979 in Book 13258, Page 788 of Official Records
7 in the Office of the County Recorder of said Orange County, more particularly described as follows:
8 Commencing at the Orange County Horizontal Control Station GPS No. 3224R1,having a
9 coordinate value(U.S. Survey foot)of North 2238822.284 and East 6096139.547 based upon the
10 California Coordinate System(CCS 83),Zone VI, 1983 NAD (1991.35 epoch OCS GPS Adjustment)as
11 said GPS No. 32244R1 is shown on the Monument Record for GPS No.32244R1 on file in the Office of
12 the Orange County Surveyor;
13 Thence, South 00°16'24"West,690.00 feet to an angle point in the existing boundary of the Orange
14 County Sanitation District(OCSD)as created by"Annexation No.66(Tract No. 9687)"to the County
15 Sanitation District No.7,said angle point being the southwest comer of said annexation and the southerly
16 terminus of that certain course described as"S 0°00'40"E 528.83"'in said annexation;said point also
17 being a point on the centerline of Orange Park Boulevard, 80.00 feet wide,as shown on said annexation;
18 Thence,leaving said existing district boundary(OCSD)and continuing along the centerline of
19 Orange Park Boulevard,South 00°16'24"West, 172.25 feet to the intersection with the centerline of
20 Meads Avenue;
21 Thence,leaving the centerline of Orange Park Boulevard,continuing along the centerline of Meads
22 Avenue the following courses:North 49°52'56"West,454.59 feet to the beginning of a tangent curve
23 concave southwesterly and having a radius of 800.00 feet;
24 Thence,northwesterly 130.20 feet along said curve through a central angle of 9°19'30';
25 Thence, tangent from said curve North 59°12'26"West,97.04 feet to the beginning of a tangent
26 curve concave southwesterly and having a radius of 800.00 feet;
1 of 3
EXHIBIT "A"
1 OCSD-39 Aronson Annexation No. DA 03-27
2 to the Orange County Sanitation District
3
4 Thence along said curve northwesterly 134.49 feet through a central angle of 9°37'57"to the
5 intersection with the southerly prolongation of the easterly boundary line of Parcel 1,a radial line of said
6 curve from said point bears North 21'09'18"East, said point also being the True Point of Beginning;
7 Thence,leaving said centerline of Meads Avenue and continuing northerly along said southerly
8 prolongation and along the easterly,northerly and westerly lines of Parcel 3 the following courses;
9 North 00°16'25"West, 309.22 feet;
10 Thence,North 89°43'41"West 192.38 feet;
11 Thence,South 00°1644"West 234.72 feet to the southwest corner of Parcel 1,said point also being
12 on the northerly right-of-way of said Meads Avenue,as shown on said Lot Line Adjustment No.LL 79-
13 20;
14 Thence,leaving the boundary of said Parcel 1 and continuing along the southerly prolongation of its
15 westerly line,South 000 16'44"West 25.43 feet to the intersection with the centerline of said Meads
16 Avenue,distant North 79008108"West 55.23 feet from the easterly terminus of that certain course shown
17 as"N79°25'26"W 184.45"'on said Lot Line Adjustment No.LL 79-20;
18 Thence,continuing along said centerline of Meads Avenue, South 79°08'08"West,55.23 feet to the
19 beginning of a tangent curve concave southwesterly and having a radius of 800.00 feet;thence,
20 southeasterly 143.69 feet along said curve through a central angle of 10017'27"to the True Point of
21 Beginning;
22
23 The above-described parcel of land contains 1.24 acres,more or less.
24
25 All as shown on Exhibit"B"attached hereto and by this reference,made a part thereof.
26
2of3
EXHIBIT "A"
1 OCSD-39 Aronson Annexation No. DA 03-27
2
to the Orange County Sanitation District
3
4 Unless otherwise noted, all distances are ground and are based upon the California Coordinate System
5 (CCS 83),Zone VI, 1983 NAD(1991.35 EPOCH OCS GPS Adjustment).To obtain grid distances,
6 multiply the ground distances by 0.99996999.
8
9 This document was prepared by me or
O�,t1D
10 under my direction and supervision.
¢O
11 Dated thisM day of 0040gr30104
12 No.6a03 Q�
13 Robert Jelinek L.S. 6803 OF GPv�O
14 My license expires 9-30-04
15
16 This document does meet the approval of
17 the Orange County Surveyor's Office
18 John Canas,County Surveyor
�rtD sOR�
19 Dated this day of ,2004 ��P�J� Pj--
0
21 0913pj0a
Per: Robert J ek,Deputy County Surveyor
22 L.S. 6803,My license expires 9-30-04 ♦c 41 5803
OF GA�-��
23
3of3
SHEET 1 OF 1
TRACT No. 918 EXHIBIT "B"
i PARCEL 2 OCSD-39 ARONSON ANNEXATION No. DA 03-27
P.4J?CffG -� ; TO THE ORANGE COUNTY SANITATION DISTRICT
P.
1----------------J
I l
I I
I I
N89'43'41'W !I ; UNINCORPORATED
592.38
N'LY LINE PCL• 1 - POC SURVEYOR'S STATEMENT
PER LL 79-20. GPS N0. 3224R1
JN N 2238822.284 THIS PROPOSAL WAS PREPARED BY ME OR
N 'P AJ10 01 I l a a, E 6096139.547 UNO D I R T N.
� w� 57
O M VN LL 79-20 U1 N JJ
54 i N AMAPOLA AVENUE ROBERT LINEK. L•S. 6003
N# a� m g }� 100' 0' 50' 100' µY LICENSE EXPIRES 9/30/2004
v G Jrr a N ------------- GRAPHIC SCALE
Yw PARCEL 1 J N E/TI-I Qa op
1' a J y o •o-`" 1'•100'
o O 3 ^ o EXP.09130/04
PCL. 3 O-
25.43' z z 56 N �"O' No.6803
55.23' M.M 28/41-43 oP�2 OF CA
!lNT9• ` io =�4
5)9•08.08 E� 26.70' TPOB mN may
d w 1p�ti
LLJ
HS9. L�7� s� Ae
4 2 �`" 9'09 a E "� �ez a
09.s �`°11 o COUNTY SURVEYOR'S STATEMENT
p-9,19 30, �I (n ='Vc° THIS PROPOSAL DOES MEET THE APROVAL OF THE
ry% / e�0 ORANGE COUNTYy,,S�URVEYORS OFF
R= 800.00, DATED THIS't� DAY OF 2004.
CURVE DATA \,\may O L= 130.20' I SV CDR. V-
N0. p R L \\ `�\ \ AN x. N0. 66 CDJOHN CANAS. COUNTY SURVE R
1 19.55'24" 800.00' 278.18' 41
2 09.3T'S7" 800.00' 134.49' �Fq \ I n BY' ROBE JELINEK. DEPUTY COUNTY SURVEYOR
40' L.S. 6803. MY LICENSE EXPIRES 9/30/2004
3 10.17'27" 800,00' 143.69' ,9 S2; 40 D �ti2o
TERRITORY ., \ ss�
LEGEN� �OQ0 9
\ o \ 0 2 EXP.09/3D/04
( 1 RECORD PER ADJOINING ANNEXATION N py�O >- * ;
No.68M aP
r ANNEXATION BOUNDARY
OFCAUf
\\ \ \ \ \ EXISTING ORANGE COUNTY SANITATION NOTES' ,
DISTRICT IO.C.S.D.) BOUNDARY, a',', UNLESS OT14ERVISE NOTED. ALL DISTANCES ON THIS HAP ARE
A.P.N. 093-441-33 �u}�eJ`� GROUND AND ARE BASED UPON THE CALIFORNIA COORDINATE
- THIS PARCEL OF LAND CONTAINS e-e'�° SYSTEM ICCS83). ZONE V1. 1983 NAD (1991.35 EPOCH OCS
INDICATES OCS HORIZONTAL CONTROL STATION AS FILED O CPS ADJUSTMENT).
IN THE OFFICE OF THE ORANGE COUNTY SURVEYOR, 1.24 ACRES. MORE OR LESS. TO OBTAIN GRID DISTANCE. MULTIPLY GROUND DISTANCE
BY 0.99996999
BOARD OF DIRECTORS Meeting Date To Bd. of Dir.
2/25/04
AGENDA REPORT Item Number Item Number
9b
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Bob Chenowith, Senior Engineering Associate
SUBJECT: PROPOSED ANNEXATION NO. OCSD-40 — HOLLE ANNEXATION
GENERAL MANAGER'S RECOMMENDATION
(1 ) Receive and file petition requesting annexation of 1 .17 acres to Orange County
Sanitation District (OCSD) in the vicinity of Clark Street and Orange Park Boulevard in
an unincorporated area of Orange County; and (2) Adopt Resolution No. OCSD 04-04,
authorizing initiation of proceedings to annex said territory to OCSD (Proposed
Annexation No. OCSD-40 — Holle Annexation).
SUMMARY
• OCSD received a request from Gene Holle to annex 1 .17 acres to OCSD. This
parcel will be connected to an existing City of Orange sewer on Clark Street.
• This parcel will be annexed to the City of Orange. The property owner will build a
single family home.
• The City of Orange will collect the sewer inspection and sewer capacity fees for this
property. This property is in Revenue Area No. 7.
PROJECT/CONTRACT COST SUMMARY
This annexation is in accordance with the terms of the negotiated agreement with the
County of Orange regarding A.B.8 Tax Exchange for annexing properties. The Board of
Directors approved this action and it became effective March 14, 1989. Under this Tax
Exchange, OCSD does not receive a percentage of the basic levy, and instead, collects
a higher annexation fee. The fee of $6,586 includes the following:
LAFCO Processing Fee $ 1 ,150
OCSD Processing Fee 500
State Board of Equalization Processing Fee 350
CA Environmental Quality Act Filing Fee 43
OCSD Annexation Acreage Fee $44 .543
TOTAL ANNEXATION FEE $ 6,586
PRIOR COMMITTEE/BOARD ACTIONS
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
0 Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
Notice of Exemption will be filed.
ATTACHMENTS
1 . Exhibit A Legal Description
2. Exhibit B Map
RLC:sa
I:\chenowith2\Annex.info\HolleAnnexation.doc
Revised: 8120101 Page 2
;a
' EXHIBIT"A"
OCSD-40 Holle Annexation No. DA-04-03
to the Orange County Sanitation District
1 Those portions of land situated in the Unincorporated Territory of the County of Orange,State of
2 California,being all of lots 106 and 108,and a portion of Lot G(Clark Street) of Tract No. 752, as shown
3 on a map thereof filed in Book 25,Pages 12 through 14,inclusive, and that certain parcel of land
4 described in a deed recorded October 18,2001 as Instrument No. 20010737385 of Official Records of
5 said County together with a portion of lot A(Orange Park Boulevard)of Tract No. 918,as shown on a
6 map thereof filed in Book 28,pages 41 through 43,inclusive,of Miscellaneous Maps, in the Office of the
7 County Recorder of said County,more particularly described as follows:
8 Beginning at an angle point in the existing boundary of the Orange County Sanitation District
9 (OCSD), as established by"Annexation No. 88"to the County Sanitation District No. 7 said angle point
10 being the southeast corner of said annexation and the southerly terminus of that certain course shown as
11 "N17017'40"W 304.05"', said angle point being also a point on the centerline of Orange Park Boulevard,
12 70.00 feet wide;
13 Thence,leaving said district boundary(OCSD)and continuing along the centerline of Orange Park
14 Boulevard South 17*01'l9"East,239.19 feet to the intersection with westerly prolongation of the
15 northerly boundary line of said parcel of land described in Instrument No. 20010737385,said point being
16 South 81°31'41"West,40.45 feet from the northwest corner of Instrument No.20010737385,from which
17 a tie to said point bears South 17*0I'19"East 930.35 feet from Orange County Horizontal Control Station
18 GPS No. 3192,having a coordinate value(U.S. Survey foot)of North 2243089.237 and East
19 6095869.521,based upon the California Coordinate System(CCS 83),Zone VI, 1983 NAD( 1991.35
20 epoch OCS GPS Adjustment)as said GPS No.3192 is shown on Tract 13833 filed in Book 690, pages 21
21 through 24,inclusive,of Miscellaneous Maps of Records of said County, said point being the True Point
22 of Beginning.
23 Thence,leaving the centerline of Orange Park Boulevard,continuing along said westerly
24 prolongation and the northerly boundary line of said land of the Instrument No. 20010737385 North
25 81031141"East, 105.01 feet to the southwest corner of Lot 106,Tract No. 752;
26
27 Page 1 of 3
EXHIBIT "A"
OCSD-40 Holle Annexation No. DA-04-03
to the Orange County Sanitation District
1 Thence, leaving the northerly line of said land of Instrument No. 20010737385 and continuing along
2 the West line of said Lot 106 and its northerly prolongation North 08'28'19" West, 180.00 feet to the
3 intersection with the centerline of Clark Street, 60.00 feet wide, as shown on said Tract No. 752;
4 Thence,along the centerline of Clark Street North 81131'41"East, 100.00 feet to the intersection
5 with the northerly prolongation of the East line of Lot 107 of said Tract 752,
6 Thence, leaving the centerline of Clark Street,continuing along said northerly prolongation and the
7 East line of Lot 107 South 08°28'19"East, 180.00 feet to the Southeast corner of Lot 107,said point
8 being on said northerly boundary line of the land described in Instrument No. 20010737385,being distant
9 South 81°31'41" West,200.00 feet from the northeast corner of said Instrument No. 20010737385;
10 Thence, leaving the East line of Lot 107,continuing along the northerly,easterly and southerly
11 boundary lines of Instrument No. 20010737385 the following courses:North 81°31'41"East,200.00 feet;
12 Thence, South 08*28'19"East, 82.45' feet;
13 Thence, South 81031'41"West,352.29 feet to the southwest corner of Instrument No.20010737385,
14 said intersection point being on the easterly right-of-way of said Orange Park Boulevard,80.00 feet wide,
15 as shown on said Tract No. 918;
16 Thence, leaving the boundary of said land of Instrument No.20010737385 and said easterly right-of-
17 way South 73°33'02" West 40.00 feet to the intersection with the centerline of Orange Park Boulevard,
18 said intersection point being on a curve concave westerly and having a radius of 2500.00 feet,a radial line
19 of said curve from said point bears South 73033102"West;
20 Thence, northerly along said curve and the centerline of Orange Park Boulevard through a central
21 angle of 00034'21"a distance of 24.98 feet;
22 Thence,tangent from said curve and continuing along the centerline of Orange Park Boulevard
23 North l 7001'19"West, 64.00 feet to the True Point of Beginning.
24
25
26
27 Page 2 of 3
EXHIBIT "A"
OCSD-40 Holle Annexation No. DA-04-03
to the Orange County Sanitation District
I Unless otherwise noted, all distances are ground and are based upon the California Coordinate System
2 (CCS 83), Zone VI, 1983 NAD(1991.35 EPOCH OCS GPS Adjustment).To obtain grid distances,
3 multiply the ground distances by 0.99997284.
4
5 The above-described parcel of land contains 1.17 acres, more or less.
6
7 All as shown on Exhibit`B"attached hereto and by this reference,made a part thereof.
8
9
to This document was prepared by me or
11 under my direction and supervision.
12
13 Dated this day of ,2004
14
15 Wanda Fae Bale L.S. 7695
16 My license expires 12-31-04
17
18
19 This document does meet the approval of
20 the Orange County Surveyor's Office
21 John Canas,County Surveyor
22 Dated this,day of 72004
23
24 Per: Michael K. Sullivan,Deputy County Surveyor
L.S. 6254,My license expires 6-30-06
25
26
27 Page 3 of 3
z
q
DRAFT
MINUTES OF STEERING COMMITTEE MEETING
Wednesday, December 17, 2003
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Wednesday, December 17, 2003 at 5 p.m., in the District's Administrative
Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS: OTHERS PRESENT:
Directors Present: Thomas L. Woodruff, General Counsel
Steve Anderson, Chair pro tem, Vice Chair Mike Moore
Jim Ferryman, Chairman, OMTS Committee Chris Townsend
Brian Brady, Chairman, FAHR Committee
Norm Eckenrode, Past Board Chair STAFF PRESENT:
Blake Anderson, General Manager
Directors Absent: Bob Ghirelli, Director of Technical Services
Shirley McCracken, Chair Carol Beekman, Communications Services
Brian Donahue, Chairman, PDC Committee Manager
Jim Silva, County Supervisor Jim Colston, Legislative and Regulatory Affairs
Liaison
Jean Tappan, Committee Secretary
(2) APPOINTMENT OF CHAIR PRO TEM
Vice Chair Steve Anderson was appointed Chair pro tem.
(3) PUBLIC COMMENTS
There were no comments by any member of the public.
(4) RECEIVE, FILE AND APPROVE MINUTES OF PREVIOUS MEETING
The minutes of the November 19, 2003 Steering Committee meeting were approved as drafted.
(5) REPORT OF THE COMMITTEE CHAIR
Committee Chair announced that registrations for CASA and the Orange County Leadership
Symposium are due to Jean Tappan this week.
Director Brian Brady asked for staff assistance in reviewing the task force's draft and recommending
options for changes to the Approval and Compensation for Directors' Meeting Attendance policy.
e
Minutes of the Steering Committee
Page 2
December 17, 2003
(6) REPORT OF THE GENERAL MANAGER
A. Legislative Update
General Manager Blake Anderson asked Chris Townsend to update the directors on the
California Senate Committee on Local Government hearing he attended in November that
concerned special districts. He stated that the Sanitation District is a good agency but he
wanted to provide information on the goings-on in Sacramento. Among things that were
discussed were 1) what is a meeting? 2) putting caps on the number of meetings and 3) limits
on stipend amounts. Mr. Townsend stated that he will continue to monitor this issue and will
keep the agency informed. He suggested that the District continue to use CASA as an
avenue and provide proactive participation through them.
A discussion followed on backfilling the monies lost as a result of the reduction in vehicle
license fees.
Mr. Anderson reported that$1 million has been earmarked in the House VA-HUD-
Independent Agencies budget for our secondary treatment expansion. He thanked
Congressman Cox and Directors Ridgeway and Silva for their efforts on our behalf. Last
week, Mr. Anderson met with Senator Diane Feinstein to go over several issues and
discussed the ear marked funds. He told her that we would be requesting $50 million over
the next decade representing less than a 20%federal share. Senator Feinstein said that she
would provide support in the future.
Carol Beekman and Mr. Anderson attended the a CASA legislative committee meeting in
Sacramento December 5 and they submitted three separate white papers on state-wide
standards for water reclamation, state-wide biosolids and urban runoff funding. Meetings will
be scheduled with the Jarvis group on including urban runoff in the Proposition 218
exemptions.
B. Orange County Leadership Symposium, January 9-11, Lake Arrowhead
Mr. Anderson urged the directors to attend this event, which is intended to provide the
electeds tools to improve dialogue on city and county issues.
C. Draft NWRI Report regarding Asset Management
Mr. Anderson stated that the NWRI-sponsored asset management review panel has
submitted its findings. Staff is suggesting that two members of the panel present the findings
to the Board in February. A summary report will be presented to the Steering Committee in
January. Staff also suggests that the report be presented to all of the working committees
because of the wide financial, planning, engineering and operational implications that asset
management implies.
Mr. Anderson suggested that the OMTS Committee be designated as the committee of
jurisdiction. He then summarized the findings for the directors.
D. Universal Power Industries Corporation Proposal
Mr. Anderson and General Counsel Woodruff discussed an unsolicited proposal on an energy
alternative. While many of the terms sound very attractive, there are still questions that need
to be answered before making any commitment. It was generally agreed that the legal,
financial and technical issues were too difficult to overcome and that the proposal should not
i
Minutes of the Steering Committee
` Page 3
December 17, 2003
be explored further.
(7) REPORT OF GENERAL COUNSEL
General Counsel Thomas Woodruff announced that the Court of Appeals has affirmed the trial
court's decision regarding Crow Winthrop. The Appellate Court issued a ruling that the District's
Capital Facilities Capacity Charge Ordinance is not subject to Proposition 218 and therefore the fees
imposed on Crow Winthrop were not invalidly charged. Appellate costs are to be paid by Crow
Winthrop.
Mr. Woodruff announced that there was a need to add an additional closed session item to the
agenda which surfaced subsequent to the posting of the agenda pursuant to Government Code
Section 54954.2.
MOVED, SECONDED AND DULY CARRIED to add an item of existing litigation to the closed
session agenda.
(8) DISCUSSION ITEMS (Items A-B)
A. Update on the Renewal of the NPDES Ocean Discharge Permit
Jim Colston updated the committee on where we are with the permit renewal. The
operational plan update has been presented to the Regional Board, as well as a
description of the disinfection facilities and how that system will continue to operate.
Meetings continue on other aspects of the permit. Mr. Colston then outlined the
scheduled. It is expected that a draft permit will be received in January or early
February. There will then be 45 days for public comments. A workshop is anticipated
in April or May and it will be held locally. Adoption should take place in July and after
the permit is adopted discussions on the consent decree process begins. No
significant changes are anticipated in the ocean monitoring program.
The Communications Services Division is assisting with the public education process.
A discussion followed on the definition of 'blending processes' and 30/30 secondary
treatment standards.
B. The agenda items scheduled to be presented to the Board at tonight's meeting
were reviewed. There were no questions or clarifications required.
(9) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There was no other business discussed.
(10) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
t
1t
Minutes of the Steering Committee
Page 4 �
December 17, 2003
(11) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND/OR STAFF REPORT
There were none.
(12) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, January 28, 2004 at 5 p.m.
The next Board Meeting is scheduled for Wednesday, January 28, 2004 at 7 p.m.
(13) CLOSED SESSION
The Committee convened at 6:16 p.m. in Closed Session, pursuant to Sections 54956.9(a)
and(b), to discuss two items. Item 12 A.2. was deleted from the agenda. Item 13.A.3. was
added per the motion adopted under Item 7 above. The matter is existing litigation, WOODSIDE
V. ORANGE COUNTY SANITATION DISTRICT, et al. There were no reportable actions taken
by the Committee.
Minutes of the Closed Session are on file with the Board Secretary. Confidential Minutes of the
Closed Session held by the Steering Committee have been prepared in accordance with
Government Code Section 54957.2, and are maintained by the Board Secretary in the Official
Book of Confidential Minutes of Board and Committee Closed Meetings. A report of the
recommended actions will be publicly reported at the time the approved actions become final.
At 6:57 p.m., the Committee reconvened in regular session.
(14) ADJOURNMENT
The Chair declared the meeting adjourned at 6:57 p.m.
Submitted by:
U.
Tappan
t ering Committee Secretary
H.1appslagendalSteenng Commilfoo1031DEC1121703 SC Minules.doc
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
Wednesday, February 4, 2004 — 5:00 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District was held on February 4, 2004, in the District's Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
OMTS Directors Present: Staff Present:
Anna Piercy, Vice Chair Blake Anderson, General Manager
Don Bankhead Bob Ooten, Director of Operations & Maintenance
Carolyn Cavecche Patrick Miles, Director of Information Technology
Cathy Green Penny Kyle, Committee Secretary
Tony Kawashima Ed Torres, Air Quality and Special Projects Manager
Tod Ridgeway Mark Esquer
Paul Walker Pinky Lopez
Rose Marsella
OMTS Directors Absent:
James M. Ferryman, Chair Others:
Shirley McCracken, Board Chair Peter Green
Steve Anderson, Board Vice Chair
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were none.
(4) REPORT OF THE COMMITTEE CHAIR
The Committee Vice Chair had no report.
(5) REPORT OF THE GENERAL MANAGER
The General Manager had no report.
(6) CONSENT CALENDAR ITEMS
a. The minutes of the December 3, 2003 Operations, Maintenance and Technical Services
Committee meeting were approved as drafted and ordered filed.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 2
February 4, 2004
b. OMTSO4-01 Receive and file Technical Services Monthly Report, which focuses on
regulatory, biosolids and performance, measures for the Technical
Services Department.
C. OMTSO4-02 Receive and file Operations & Maintenance Monthly Report, which
focuses on compliance, financial data and performance measures for the
Operations and Maintenance Department.
d. OMTSO4-03 Receive and file Information Technology Quarterly Report, which focuses
on current performance trends and key technology business applications.
e. OMTSO4-04 Recommend to the Board of Directors to ratify Change Order No. 1 to
Treatment Plant No. 2 North and South Scrubber Complex Caustic Tank
Replacement, Specification No. S-2003-131, with Jamison Engineering,
authorizing an additional amount of$22,800 increasing the total amount
not to exceed $112,489.
Motion: Moved, seconded and duly carried to approve the recommended actions
for items specified as 6(a) through (d) under Consent Calendar.
Director Cathy Green abstained on Item No. 6(a).
(7) ACTION ITEMS
a. OMTSO4-05 Recommend to the Board of Directors to authorize the General Manager
to award a sole source purchase order to Schwing America, Inc., for
overhauling three Schwing sludge pumps for an amount not to exceed
$129,460, for labor and materials.
Bob Ooten responded to Directors' questions regarding the current
condition of the three Schwing sludge pumps and briefly described the
work required to maintain the sludge pumps.
Motion: Moved, seconded and duly carried to recommend approval to the Board
of Directors.
b. OMTSO4-06 Recommend to the Board of Directors to (1)Approve a budget
amendment of$150,000 for Phase III Biotrickling Filter Demonstration
Project, SP-90-7, for a total budget of$925,000, as an alternative
treatment to control odors; and,
(2) Approve Amendment No. 7 to the Study Agreement with the
University of California, Riverside to provide continued support for testing
biotrickling filters as an air emissions control technology for an additional
amount of$150,000 for a total amount not to exceed $355,000.
Ed Torres gave a presentation on the alternative methods of treatment to
control odors showing ways to reduce energy costs and minimize health
risks. University of California, Riverside is currently conducting studies to
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 3
February 4, 2004
optimize the system and perform research on new technologies designed
to reduce odors at treatment plans.
Motion: Moved, seconded and duly carried to recommend approval to the Board
of Directors.
(8) INFORMATIONAL ITEMS
a. OMTSO4-07 Update on Major Air Quality Issues Impacting the District
Blake Anderson gave a brief overview of the regulations the District
currently adheres to that deals with air quality criteria issues.
Ed Torres presented the impacts of major air quality regulations that need
to be administered and adopted by the District. Directors expressed
concerns on dealing and coping with the potential health risks to the
community and staff as well. Major adjustments and programs were
suggested to alleviate exposure to hazardous air pollutants over time.
(9) REPORT OF DIRECTOR OF INFORMATION TECHNOLOGY
The Director of Information Technology had no report.
(10) REPORT OF DIRECTOR OF OPERATIONS AND MAINTENANCE
The Director of Operations and Maintenance had no report.
(11) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
There was none.
(12) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
There were none.
(13) FUTURE MEETING DATES
The next Operations, Maintenance and Technical Services Committee meeting is
scheduled for March 3, 2004 at 5 p.m.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 4
February 4, 2004
(14) CLOSED SESSION
There was no closed session.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 6:37 p.m.
Submitted by:
CS7-�"
Pinky E. Lopez
Operations, Maintenance and Technical Services
Acting Committee Secretary
H:ldeptlagendal0MTS12004102041020404 OMTS Minutes.doc
OMTS COMMITTEE Meeting Date To 2/ of Dir.
00 2/04/04 02/25/ 4
AGENDA REPORT Item Number Item Number
OMTSO4-04 I 12(b
Orange County Sanitation District
FROM: Robert J. Ooten, Director of Operations and Maintenance
Originator: Michelle Hetherington, Associate Engineer
SUBJECT: TREATMENT PLANT NO. 2 NORTH AND SOUTH SCRUBBER
COMPLEX CAUSTIC TANK REPLACEMENT(S)
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 1 to Treatment Plant No. 2 North and South Scrubber
Complex Caustic Tank Replacement, Specification No. S-2003-131, with Jamison
Engineering, authorizing an additional amount of $22,800 increasing the total amount
not to exceed $112,489.
SUMMARY
• In March 2003, the Board of Directors established a project budget and ratified
approval of contracts to complete the emergency work to replace two existing
chemical storage tanks. The March 2003 Board authorization established a budget
of $230,00 for the work including $90,000 for tank installation, $67,000 for the two
tanks, $33,000 for District staff and a $40,000 contingency. The District selected
Jamison Engineering through a competitive bid process to replace two leaking
chemical storage tanks.
• Three items of additional work were required to complete the installation of the new
tanks. These items consisted of modifying the tank foundation, cleaning and
disposal of the chemical deposit from the old tanks and minor electrical and piping
work to accommodate the tank foundation work.
• A detailed inspection of the existing tank foundation, after the tank was removed,
revealed that additional structural support was required to meet the current building
codes for earthquake safety. Staff directed the contractor to make the required
modifications along with some minor electrical and piping work required to
accommodate the additional foundation work.
• During the existing tank removal it was discovered that the chemical deposit that had
built up on the interior of the old tanks would be required to be disposed of. The
contractor used a hazardous waste disposal company to remove the chemical
waste. Staff also directed the contactor to complete the cleaning and disposal work.
• The ratification of staff action is required because staff is asking the Board to
approve this action.
Change Order No. 1 Content
Item Description Amount
No.
1 Structural modifications to Chemical Tank S15,900
Concrete Pad to meet seismic codes
2 Cleaning of damaged chemical tank before $3,500
disposal
3 Conduit Routing for level sensor S1 ,500
4 Installation of piping and support 51 ,900
Total — Change Order No. 1 $22,800
Job Completion
• The job is essentially complete.
PRIOR COMMITTEE/BOARD ACTIONS
March 2003 Board: (1) Establish a budget of $230,000; and (2) Ratify emergency
purchase of chemical tanks; and (3) Ratify emergency purchasing authority for Jamison
Engineering for an amount of $89,689, the lowest bid of three companies that submitted
bids.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 89,689
Previously Authorized Changes $ 0
This Change $ 22,800
Final Contract Price $112,489
The cost of this emergency project was approved and budgeted. The project budget
included a $40,000 contingency that will be used to pay for the additional work.
BUDGETIMPACT
® This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted
❑ Not applicable (information item)
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204`,Item 12(b).Jamison Engineedng.doc
Page 2
ADDITIONAL INFORMATION
None
ALTERNATIVES
N/A
CEQA FINDINGS
This project is exempt from CEQA per Section 15301 (b).
ATTACHMENTS
None
MAE/MRH:ct
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 12(b).Jamison Engineering.doc
Page 3
OMTS COMMITTEE Meeting Date To Bd.of Dir.
2/4/04 2/25/04
AGENDA REPORT Item Number item Number
OMTSO4-05 12(c
Orange County Sanitation District
FROM: Robert J. Ooten, Director of Operations and Maintenance
Originator: Vicki Henn, Process Engineering
SUBJECT: OVERHAUL OF THE BIOSOLIDS TRANSFER PUMPS IN THE PLANT
NO. 1 TRUCK LOADING FACILITY.
GENERAL MANAGER'S RECOMMENDATION
Authorize the General Manager to award a sole source purchase order to Schwing
America. Inc., for overhauling three Schwing sludge pumps for an amount not to exceed
S129,460, for labor and materials.
SUMMARY
• Staff is recommending using the original equipment manufacturer and repairing
this equipment. The staff analysis demonstrates a savings in repair cost and
time using this vendor.
• The sludge pumping equipment at the truck loading facility at Plant No. 1 was
installed in 1990. Many parts are reaching the end of their useful life, requiring
overhaul and replacement. District staff have worked on repairing one of the four
pumps.
• The existing Schwing pumps are a specialty biosolids cake handling pump.
Having Schwing technicians rebuild the existing pumps, with original equipment
parts, should provide the longest life possible from the rebuild.
• By using Schwing sole source, staff estimates a savings on the overall project of
approximately S69,000 including materials and labor, compared to District staff
historical costs.
• Based on the negotiated repair time awarding the contract to Schwing will reduce
the down time of the units, compared to District staff performing the work.
allowing for continued reliable service for biosolids cake pumping.
H:Wept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\I1em 12(c).Schwing America.doc
Revised: 0&04/03 Page 1
• Using Schwing technician will also allow District staff to receive training during
the rebuild process for future maintenance and repair of the units.
PRIOR COMMITTEE/BOARD ACTIONS
None.
PROJECT/CONTRACT COST SUMMARY
Overhauling of the existing Schwing pumps has been budgeted by the Mechanical
Maintenance/Power Production Division.
BUDGET IMPACT
® This item has been budgeted. (Line item: 850.54010)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
One of the four units has recently been repaired by District staff. Although the repair did
not consist of the full rebuild as proposed by Schwing, the cost of the repairs was
approximately S36,000. Projecting this cost to a total rebuild by District staff would
increase the manhours from approximately 600 to 1000 per unit. plus additional parts of
approximately S12,000 per unit. This would bring the total rebuild cost to S66,000 per
unit, compared to Schwing's proposed estimate of approximately S43.300 per unit.
ALTERNATIVES
• The work could be advertised and bid. This would not ensure a lower cost, but
would increase the time to get the work done. and may allow technicians not
specifically trained with this particular equipment., as well as use of non original
equipment manufactured parts. The additional time for the bidding, and possible
time extensions for parts lead time, unfamiliarity with equipment, unfamiliarity
with District policies and procedures, could lead to delays and the failure of
existing worn equipment.
• This work could be done with District staff at a potential higher cost (5010), and
over a longer schedule (12 weeks per unit instead of Schwing's proposed 6
weeks per unit). This would also take maintenance staff away from other high
priority repairs throughout the plant. The pumps are in need of urgent repair, and
this is not recommended.
HP,dept\agenda\Board Agenda Reportsi2004 Board Agenda Reports=04\Item 12(c).Schwing America.doc
Revised: 06/04/03 Page 2
CEQA FINDINGS
This project is exempt from CEQA requirements.
ATTACHMENTS
None
H:ldept\agenda\Board Agenda Reports\2004 Board Agenda Reporls10204Utem 12(c).Schwing America.doc
Revised: 06/04/03 Page 3
Meeting Date To Bd.of Dir.
OMTS COMMITTEE 02/04/04 02/25/04
AGENDA REPORT Item Number Item Number
OMTSO4-06 12(d)
Orange County Sanitation District
FROM: Bob Ooten, Director of Operations and Maintenance
Originator: Ed Torres, Air Quality & Special Projects
SUBJECT: PHASE III BIOTRICKLING FILTER DEMONSTRATION PROJECT
GENERAL MANAGER'S RECOMMENDATION
1 . Approve a budget amendment of S150,000 for Phase III Biotrickling Filter
Demonstration Project, SP-90-7, for a total budget of $925,000, as an alternative
treatment to control odors: and,
2. Approve amendment No. 7 to the Study Agreement with the University of California,
Riverside to provide continued support for testing biotrickling filters as an air
emissions control technology for an additional amount of S150,000 for a total amount
not to exceed S355.000.
SUMMARY
• In June 2001 and October 2002, the Board authorized a sole source agreement with
UC Riverside to perform research on a new technology designed to reduce odors at
the treatment plants.
• The research has been conducted to develop technology that reduces chemical
operating costs, scrubbers system maintenance costs and expands the removal of
odorous compounds.
• The research to date has included retrofitting five existing District chemical
scrubbers to biotrickling filters, monitoring and analyzing their performance in
removing hydrogen sulfide and other chemicals at various operating conditions,
developing capital and operating cost estimates for future retrofits, providing
technical expertise and guidance, and developing appropriate reports.
• Our research has shown that compounds other than hydrogen sulfide, although
present in very low concentrations, are the major causes of odors in some foul air
streams. Further research is needed to determine the operating conditions and
treatment retention times needed to remove these other odorous compounds.
• Our research also has shown that the random foam packing material has higher-
than-expected pressure drop through the packing, which increases the energy
costs. The packing manufacturer also makes a rigid structured packing that may
have less pressure drop. The District intends to test this structured packing to
H:\dept\agenda\Board Agenda Reports`2004 Board Agenda Reports\0204\Item 12(d).UC Riverside.docRevised: 0&04;03
Page 1
determine the pressure drop and evaluate the packing's performance for removing
hydrogen sulfide and odors.
1 . Evaluate the performance and costs (capital and operating) of using a structured
foam packing rather than the flexible random foam packing that has been tested;
develop recommendations for applications in future capital projects.
2. Expand olfactometry analyses to characterize odors and identify effective control
practices.
3. Develop a method to assess the health of the microorganisms in a biotrickling filter
to increase the long-term reliability of biological odor treatment.
4. Expand the current testing program and focus on improving the biotrickling filters'
effectiveness in removing compounds other than hydrogen sulfide that are
contributing to offsite odor impacts.
5. Conduct testing of 2-stage odor control technologies, using pilot-scale facilities to
develop design criteria for odor control of the solids dewatering process.
• The following Phase III research is recommended by staff to increase the range of
successful biotrickling filter applications and to take advantage of the knowledge that
already has been gained in this project:
• A final project report on the work completed through December 2003 by the U.C.
Riverside staff is due in the spring of 2004. Due to transition of U.C. Riverside
graduate staff the report completion has been delayed. The results and
recommendations from the report are included in this Agenda Report. Staff will bring
the final report to the Board to receive and file when it is available.
• Staff recommends continuing the collaboration with the University of California,
Riverside to provide technical assistance and consulting expertise in evaluating
biotrickling filter applications. University of California, Riverside personnel have
acknowledged expertise in the field of biological filtration and have provided very
valuable assistance in the current project.
PRIOR COMMITTEE/BOARD ACTIONS
OMTS 6/6/01/Board approved 6/27/01 Biotrickling Filter Testing for Odor Control in the
amount of $145,000
OMTS 10/2/02/Board approved 10/23/02 Phase II Biotrickling Filter Demonstration
Project in the amount of $285,000
OMTS 3/5/03/ Board 3/26/03 Receive and file report. Phase 11 Biotrickling Filter for Odor
Control Demonstration Project, prepared by University of California, Riverside dated
February 2003.
PROJECT/CONTRACT COST SUMMARY
The estimated cost for the proposed Phase III Biotrickling Filter Demonstration project
work is 3150,000 for continuing technical assistance from the University of California.
Riverside.
H;\dept\agenda\Board Agenda Reports`2004 Board Agenda Reports`A204\Item 12(d).UC Riverside.docRevised: 06/04/03
Page 2
1
There are savings in chemicals and maintenance costs with biotrickling filters compared
with chemical scrubbers. In addition there are other benefits of biotrickling filters over
chemical scrubbers, including a less hazardous work environment for staff and the
ability to treat additional odorous and hazardous air pollutants.
Chemical savings to date associated with the conversion of 3 chemical scrubbers to
biotrickling filters (2 of the 5 chemical scrubbers were on stand-by and thus there were
no chemical savings) is approximately $580,000 for 2 years of operation.
For perspective, a summary of the total costs incurred to date including the proposed
cost for Phase III is provided below:
Original feasibility study and laboratory work by University of
California, Riverside $ 25,000
Biotrickling Filter Demonstration Project Phase I contract with
University of California, Riverside $ 145,000
District internal costs including laboratory work for Phase 1 $ 80,000
Conversion costs for 5 chemical scrubbers in Phase 1 $ 200,000
Total Phase I Cost $ 450,000
Biotrickling Filter Demonstration Project Phase II contract with
University of California, Riverside $ 60,000
Other external costs (technical services, equipment, supplies) $ 117,000
District internal costs for Phase II $ 108,000
Conversion costs for 3 additional scrubbers (This project is being
funded under a separate facilities small project budget) $ 145,000
Total Phase II Cost (demonstration project only) $ 285,000
Biotrickling Filter Demonstration Project Phase III contract with
University of California, Riverside $ 150,000
Estimated District internal costs including laboratory for Phase III $ 40,000
Total Phase III Cost $ 190,000
Total Estimated Demonstration Project Cost $ 925,000
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 12(d).UC Rlverside.docReAsed: 06/04/03
Page 3
® This item has been budgeted, but there are insufficient funds. (Line item:
FY 2003-04 Budget, Special Projects SP-90-7, Section 8, Page 10) ,
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Project Background
• The potential advantages of biological technologies over traditional chemical
treatment approaches are reduced Operations and Maintenance costs, the ability to
treat a wider range of air odor pollutants [odors, volatile organic compounds, and air
toxics], and improved safety by eliminating the use of dangerous chemicals.
• Biological treatment capability is becoming more important as the South Coast Air
Quality Management District focuses their attention on ever-expanding numbers of
compounds. Biological filters are able to remove volatile organic compounds and
toxic compounds that chemical scrubbers do not remove.
• The safety of plant staff is improved when hazardous chemicals used in
conventional scrubbers are no longer used.
Previous Work
• An initial District-funded study at the University of California, Riverside evaluated the
feasibility of converting scrubbers to biofilters using special foam packing from
Germany. The results were very encouraging and suggested that a number of the
District's scrubbers were conversion candidates, with potential cost savings resulting
in payback periods of less than one year in some cases.
• One existing scrubber initially was converted in Phase I and evaluated. Based on its
success, four additional scrubbers were converted.
• The work to-date has demonstrated that effective odor control involves more than
just hydrogen sulfide removal. Other compounds of sulfur or nitrogen, while present
in very small amounts, can be very odorous. Different biotrickling operating
conditions (pH and treatment time) may favor the removal of different chemicals.
• The innovative nature of our work done under Phases I & II has been acknowledged
in technical publications, including the prestigious Proceedings of the National
Academy of Sciences, and newspaper articles around the world.
ALTERNATIVES
No action; do not continue testing biological alternatives to conventional wet chemical
scrubbers. This is not recommended due to the potential cost savings and safety
improvements that would not be realized in both current operations and future odor
control facilities.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204Htem 12(d).UC Riversido.docRevised: 06/04103
Page 4
CEQA FINDINGS
This research effort is categorically exempt from CEQA (Section 15306).
ATTACHMENTS
None.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204%em 12(d).UC Riverside.docRevised: 06/04/03
Page 5
i DRAFT
MINUTES OF PLANNING, DESIGN, AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday, February 5, 2004, at 5 p.m.
A meeting of the Planning, Design, and Construction Committee of the Orange County
Sanitation District was held on Thursday, February 5, 2004, at 5 p.m., in the District's
Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
PDC COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present: David Ludwin, Director of Engineering
Brian Donahue, Chair John Linder, Construction Manager
Alice Jempsa, Vice Chair Chris Cervellone, Construction Supervisor
Patty Campbell Jim Herberg, Engineering Manager
John Collins Matt Smith, Engineering Manager
Alberta Christy Jean Tappan, Committee Secretary
Norm Eckenrode
Patsy Marshall OTHERS PRESENT:
Steve Anderson, Board Vice Chair Jason Retterer, Counsel's Office
Umesh Murthy
Directors Absent: Dave May
Beth Krom Kathy Millea
Shirley McCracken, Board Chair Dave MacDonald
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Committee Chair Brian Donahue asked for input on whether to change the time of the PDC
Committee meetings. After discussion it was decided to leave it at the 5 p.m. start time.
PDC Committee Minutes '
Page 2
February 5, 2004
(5) REPORT OF THE GENERAL MANAGER
General Manager Blake Anderson was not present.
(6) REPORT OF THE DIRECTOR OF ENGINEERING
Director of Engineering David Ludwin reported that the April meeting would be held on the second
Thursday, April 8. He also reported that at the next JCC meeting, a name change for that committee
would be considered, i.e. GWRS Steering Committee. This will be presented to the joint boards at
their respective February meetings. On February 18, there is a New Directors Workshop and on
February 19 there is a groundbreaking ceremony for GWRS in the north parking lot at Edison Field.
Lunch will be served.
(7) REPORT OF GENERAL COUNSEL
Counselor Jason Retterer did not make a report.
(8) CONSENT CALENDAR (Items a-I)
Consideration of motion to approve all agenda items appearing on the Consent Calendar
not specifically removed from same, as follows:
All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation, and unless any particular item is requested to be removed from the
Consent Calendar by a Director or Staff member, there will be no separate discussion of
these items. All items on the Consent Calendar will be enacted by one action approving all
motions, and casting a unanimous ballot for resolutions included on the consent calendar. All
items removed from the Consent Calendar shall be considered in the regular order of
business.
Director Collins asked that Item g. be pulled from the Consent Calendar for separate
consideration. Director Steve Anderson asked that Item I. be pulled from the Consent
Calendar for separate consideration.
a. RECEIVE FILE, AND APPROVE MINUTES OF PREVIOUS MEETING
Receive, file, and approve draft minutes of the December 4, 2003 Planning, Design, and
Construction Committee meeting.
b. CHANGE ORDER REPORTS
Attached are the Monthly and Quarterly Change Order Reports and the Report of
Construction Contracts with Potential Change Orders over Five Percent (5%). This is an
information only item. Action on change orders that require PDC Committee or Board
approval will be taken separately. There are four change orders this month for PDC
Committee approval.
' PDC Committee Minutes
Page 3
February 5, 2004
C. PSA AND ADDENDA REPORT
Attached is the PSA and Addenda Report. This is an information only item. Action on
PSAs and Addenda that require PDC Committee or Board approval will be taken
separately. There were no PSAs and one Addendum approved by the General Manager
from November 21, 2003 through January 22, 2004.
d. FACILITIES ENGINEERING CONSULTANT ACTIVITY REPORT
Attached is the Facilities Engineering Consultant Activity Report. This is an information
only item.
e. SANTA ANA RIVER INTERCEPTOR RELOCATION AND PROTECTION STATUS
REPORT
Attached is the Santa Ana River Interceptor (SARI) Relocation and Protection Status
Report. This is an information only item.
f. QUARTERLY GROUNDWATER REPLENISHMENT SYSTEM (GWRS) STATUS
REPORT
Attached is the Quarterly Groundwater Replenishment System Status Report. This is an
information only item.
h. PDC04-02 Recommend to the Board of Directors to ratify Change Order No. 12 to
Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37, with
Margate Construction, authorizing an addition of $22,390, increasing the
total contract amount to $71,241,204.
i. PDC04-03 Recommend to the Board of Directors to approve Amendment No. 3 to
the Professional Services Agreement with Ninyo & Moore, to provide for
Materials Testing, Inspection, and Geotechnical Engineering Services,
Specification No. PSA-2001-33BD, for FY2003/04 for an additional
amount not to exceed $75,000.
j. PDC04-04 Recommend to the Board of Directors to approve Amendment No. 2 to
the Professional Services Agreement with Smith Emery GeoServices, to
provide for additional Materials Testing, Inspection, and Geotechnical
Engineering Services, Specification No. PSA-2002-3313D, for FY2003/04
for an additional amount not to exceed $75,000.
k. PDC04-05 Recommend to the Board of Directors to approve Amendment No. 3 to
the Professional Services Agreements with MDS Consulting and Bush &
Associates, to provide for additional Surveying Services, Specification
No. PSA-2001-3413D, for FY2003/04 for an additional amount not to
exceed $75,000 for each agreement ($150,000 total).
PDC Committee Minutes
Page 4
February 5, 2004
Motion: MOVED, SECONDED AND DULY CARRIED to approve the recommended
actions for items specified as 10(a) through (f) and (h) through (k) under
Consent Calendar.
g. PDC04-01 Recommend to the Board of Directors to ratify Change Order No. 5 for
Area Classification Study Implementation Plan, Plant Nos. 1 and 2, Job
No. J-35-2, with J.F. Shea Construction, Inc., authorizing an addition of
$214,954, increasing the total contract amount to $14,946,310.
After clarification, the number of items identified in the agenda report
should be 5 rather than 6.
Motion: MOVED, SECONDED AND DULY CARRIED to approve the
recommended action.
I. PDC04-06 Recommend to the Board of Directors to ratify Change Order No. 4 to
Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, with Steve P. Rados,
Inc., authorizing an addition of $380,251, increasing the total contract
amount to $30,685,478.
John Linder explained the sequence of events and the reason the District
paid for relocating the city sewer line. Director Steve Anderson
commented on the number of items that the city of Huntington Beach has
required during construction.
Motion: MOVED, SECONDED AND DULY CARRIED to approve the
recommended action.
(9) ACTION ITEMS (Items a-e)
a. PDC04-07 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to ratify Change Order No. 1 to Effluent Pump Station
Annex, Job No. J-77, with J. F. Shea Construction, Inc., authorizing a
deduction of$1,967,158, decreasing the total contract amount to
$42,768,360.
Chris Cervellone reported that this change order was a result of the PDC
Committee's direction last September to negotiate with the contractor
because of an incorrect interpretation of the pipe size by the
manufacturer.
b. PDC04-08 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to approve a reimbursement agreement with the City of
Tustin to reimburse the Orange County Sanitation District for the
construction cost of two City water line projects located in Prospect
Avenue and Cameron Lane for an amount of $665,211 plus administrative
fees in a form acceptable to General Counsel.
PDC Committee Minutes
Page 5
February 5, 2004
Matt Smith reported that the wording on the agenda should be revised to
remove the words 'not to exceed' from the recommendation.
C. PDC04-09 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to (1) Approve Professional Services Agreement with
MWH Americas, Inc. for engineering services for Rehabilitation of
Activated Sludge Plant at Plant No. 2, Job No. P2-74, for an amount not to
exceed $2,139,998; and (2) Authorize the General Manager to issue Task
Authorizations not to exceed $100,000.
Matt Smith provided an overview of the project and stated that the
contract does not include construction services. Staff will return to the
committee for an amendment for those services once the project is under
construction and the need can be more accurately defined. Staff will also
report to the PDC Committee when task authorizations are awarded.
Director Steve Anderson abstained from voting on this item.
Director Alberta Christy arrived at 6.07 p.m.
d. PDC04-10 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to (1) Approve Professional Services Agreement with
Black & Veatch Corporation to provide engineering services for
Secondary Activated Sludge Facility 2 at Plant No. 1, Job No. P1-102, for
an amount not to exceed $18,396,463; and (2) Authorize the General
Manager to issue Task Authorizations not to exceed $200,000. (3)
Authorize the General Manager to issue Task Authorizations between
$200,000 and $500,000 providing there is a time sensitive need AND a
PDC meeting cannot be called within 72 hours.
Matt Smith reported that this project is on the critical path for meeting
secondary treatment standards and must be complete by December
2012. He reported on the negotiations with the consultant.
The General Manager was authorized to tentatively approve task
authorizations between $200,000 and $500,000 with the provision that a
special PDC Committee meeting would be called within 72 hours to
approve the actions.
Director Norman Eckenrode opposed.
e. PDC04-11 MOVED, SECONDED AND DULY CARRIED TO: Recommend to the
Board of Directors to authorize the circulation of the revised Notice of
Preparation for the Rehabilitation of Ellis Avenue Pump Station, Job
No. 1-10, for public review.
Jim Herberg presented the additional alternative sites for the Ellis Avenue
Pump Station that were identified by the consultant. Mr. Herberg provided
background information on the project and the need to divert water to
PDC Committee Minutes
Page 6
February 5, 2004
Plant 1 in order to equalize flows between plants. CEQA requires that
reasonable alternatives be discussed in detail in the EIR. At this time,
staff and the consultant recommend Alternatives A, B, G, H and J. After
discussion it was decided to add detailed discussion of Items I and F.
(10) CLOSED SESSION
There was no closed session.
(11) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There were none.
(12) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(14) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday,
March 4, 2004 at 5 p.m.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 6:30 p.m.
Submitted by:
1
Je
PDO" rappan
Committee Secretary
G:\wp.dialagenda\PDC\2001 Wlinules\PDC Minutes Form.doc
l
PDC COMMITTEE Meeting Date To Bd.of Dir.
2/5/2004 2/25/2004
AGENDA REPORT Item Number Item Number
PDC04-01 13(b
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Julian Sabri, Project Manager
SUBJECT: AREA CLASSIFICATION STUDY IMPLEMENTATION PLAN
PLANT NOS. 1 and 2, JOB NO. J-35-2
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 5 for Area Classification Study Implementation Plan, Plant
Nos. 1 and 2, Job No. J-35-2, with J.F. Shea Construction, Inc., authorizing an addition
of $214,954, increasing the total contract amount to $14,946,310.
SUMMARY
Background
• This project implements a study of Plant Nos. 1 and 2 to comply with the National
Electrical Code (NEC) by utilizing NFPA 820 Standard. The work includes
modification of ventilation systems to meet the code requirements, replacement or
modification of electrical systems, installation of a fire alarm system in the tunnels,
and replacement/relocation of digester and natural gas piping.
• The plans and specifications were prepared by Parsons/Lee & Ro, and the contract
was awarded to J.F. Shea Construction, Inc., on June 26, 2002.
• Change Order No. 5 includes five items of added work. There are no errors and five
omissions associated with this change order. Liquidated damages on this contract
are $3,000 per day and there are no bonus provisions.
Contract Schedule
Contract Start Date September 16, 2002
Original Contract Completion Date June 17, 2005
Total Number of Change Orders to Date 5
Current Contract Completion Date June 17, 2005
Actual Completion Date N/A
Days Subject to Liquidated Damages N/A
Page 1
Change Order No. 5 Content
Item Description Amount Days Type
No.
1 Electrical Modifications at Plant No. 1 34,661 0 Omission
2 Electrical Modifications at Plant No. 2 15,464 0 Omission
3 Mechanical Modifications at Plant No. 1 65,251 0 Omission
4 Mechanical Modifications at Plant No. 2 49,013 0 Omission
5 Structural Modifications at Plant Nos. 1 50,565 0 Omission
and 2
Total — Change Order No. 5 S214,954 0
Job Completion
This project is 68% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on June 26, 2002. Please refer to
the attached Change Order Status Report for information on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 14,066,442
Previously Authorized Changes $ 664,914
This Change $ 214,954
Change Orders to Date $ 879,868
Percentage Increase to Date 6.260%
Final Contract Price $ 14,946,310
BUDGETIMPACT
® This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
None
ALTERNATIVES
None
Page 2
CEQA FINDINGS
This project is categorically exempt from CEQA requirements.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
JBF:dm:gc
H:\ntglobaKAgenda Draft Reports\PDC\J-35-2 AR CO#5 022504.doc
Page 3
BUDGET INFORMATION TABLE
AREA CLASSIFICATION STUDY IMPLEMENTATION PLAN PLANT NOS. 1 & 2
JOB NO. J-35-2
a f ,
�;✓ A,
a
+l I .�. r•,ti.
O)tIi31NAL CU" r a;siOF).Q. a i,'_P s+ JT�D STIIYIATEb
PRO.JECT/PHASE AU P 'A"b x PR + .> +' /UTFtp "T1 }* �'� 0 AL I' I REAl
HUIiQET `' ' BU F1#C~ r
4 L,�.N .:�,� F �+' �;,,z ,., ,� ."rn"•x�. ,. '� : �;x��']Cr�$T,�*AUT�iORIZAT•!f!N �``,TObATE ,>bA7E(�/e)'
s� k^.��GC�IA��''f;,;x
Phase 1 -Project Development $ 106,000 $ - $ 106,000 $ 106,000 $ 106,000 100%
Phase 2-Preliminary Design $ 682.009 $ - $ 682,000 $ $ 682,000 $ 682,000 100%
Phase 3-Design $ 3,745,000 $ 2,305.000 $ $ 2,305,000 $ 2,305,000 $ 2,305,000 $ 2,286,508 99%
Phase 4-Construction $ 21,307,170 $ 17.846.950 $ 214,954 . $ 18.061,904 $ 17,846,950 $ 214,954 $ 18,061,904 $ 8,826,714 49%
Phase 5-Commissioning $ 281,328 $ 281,000 $ - $ 281,000 $ - $
Phase 6-Close-Out $ 70,332 $ 70,000 $ - $ 70 000 ', $ - $
Phase 7-Contingency $ 3,153,170 $ 780,050 $ 214,954 $ 565,096 ', $ - $
PROJECT TOTAL $ 29,345,000 $ 21,283,000 $ - $ 21,283,000 '�. $ 20,939.950 $ 214,954 $ 21,154,904 $ 11,901,222 56%
Reimbursable Costs
PROJECT NET $ 29.345.000 $ 21,283,000 $ - $ 21,283,000 ,`: $ 20,939,950 $ 214,954 $ 21,154,904 $ 11,901,222 56%
PSA1Contract
Desi n PSA $ 3,411,411 $ 3,951,021 $ 3,951,021 $ 3,951.021 $ - $ 3,951,021 $ 3,019,281 76%
Construction Contract $ 14,066,442 $ 14.731,356 $ 214,954 $ 14,946,310 $ 14,731,356 $ 214,954 $ 14,946,310 $ 7,818,499 52%
EDMS 003761534 '
CHANGE ORDER STATUS REPORT
Area Classification Study Implementation Plan, Plants 1 and 2
Job No. J-35-2
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE TIME TO DATE
(CUMULATIVE) (DAYS) (DAYS)
CONTRACT 9/16/2002 $ 14,066,442.00 $ 14,066,442.00 0.00% 1006 1006
CO NO. 1* 5/1/2003 $ 115,280.00 $ 14,181,722.00 0.82% 0 1006
CO NO. 2* 9/4/2003 $ 83,195,00 $ 14,264,917.00 1.41% 0 1006
CO NO. 3 10/22/2003 $ 269,345.00 $ 14,534,262.00 3.33% 0 1006
CO NO. 4 11/19/2003 $ 197,094.00 $ 14,731,356.00 4.73% 0 1006
CO NO. 5 Pending $ 214,954.00 $ 14,946,310.00 6.26% 0 1006
*Approval by PDC Committee per Delegated Authority By Board Resolution 99-23
EDMS 003761535
Page 1 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Five 5
Date: February 25, 2004
Job: Area Classification Study Implementation Plan, Plant Nos. 1 and 2, Job No. J-35-2
Consultant: Parsons/Lee & Ro
Amount of this Change Order(Add)(Peduet) $214,954.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation therefor, the following additions to or
deductions from the contract price are hereby approved.
ITEM 1 — ELECTRICAL MODIFICATIONS AT PLANT NO. 1
The Contractor was directed to furnish labor, materials and install electrical modifications that meet
classified area requirements and were not shown on the contract documents. A summary of the
items and associated costs are as follows:
Item Quanti Cost Reference
a) Add Class I Division 1 light fixtures, conduit and wire
in the basement of the gas compressor building. 2 $ 12,961 FCO No. 14
b) Relocate instrument air dryer, including electrical and,
piping in the basement of the gas compressor building. 1 7,855 FCO No. 34
c) Relocate Class I Division 1 light fixtures, conduit and
wire in the basement of the gas compressor building. 3 12,912 FCO No. 39
d) Add explosion proof conduit and fittings at
digesters 5 and 6. 10 LF 933 FCO No. 147
This additional work was negotiated with the Contractor pursuant to Section 43 (B) 1) of the General
Requirements, Division 01.
ADDED COST THIS CHANGE ORDER ITEM: $34,661.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 2 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Five 5
Date: February 25, 2004
Job: Area Classification Study Implementation Plan, Plant Nos. 1 and 2. Job No. J-35-2
Consultant: Parsons/Lee & Ro
ITEM 2— ELECTRICAL MODIFICATIONS AT PLANT NO. 2
The Contractor was directed to furnish labor, materials and install electrical modifications that meet
classified area requirements and were not shown on the contract documents. A summary of the items
and associated costs are as follows:
Item Quanti Cost Reference
a) Add explosion proof conduit and fittings at
digesters F and G lower valves. 20 LF $2,936 FCO No. 5
b) Add W seal-off fittings, conduit and wire at
digesters N and O. 60 LF 7,985 FCO No. 79
c) Relocate level indicators and transmitters at
digesters P and Q to make room for new door. 2 $3,786 FCO No. 129
d) Relocate warning beacon on roof of the gas
compressor building that conflicts with the
installation of new gas piping. 1 757 FCO No. 173
This additional work was negotiated with the Contractor pursuant to Section 43 (B) 1) of the General
Requirements, Division 01.
ADDED COST THIS CHANGE ORDER ITEM: $15,464.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 3 of 7
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Five 5
Date: February 25, 2004
Job: Area Classification Study Implementation Plan, Plant Nos. 1 and 2. Job No. J-35-2
Consultant: Parsons/Lee & Ro
ITEM 3—MECHANICAL MODIFICATIONS AT PLANT NO. 1
The Contractor was directed to furnish labor, materials and install mechanical modifications that meet
classified area requirements and were not shown on the contract documents. A summary of the items
and associated costs are as follows:
Item Quanti Cost Reference
a) Relocate 1" condensate drain line and 8" drain
fittings at digesters 12 and 13. varied items $ 3,590 FCO No. 11
b) Furnish and install 10" stainless steel pipe fittings
to connect flame arrestor on digester 16. varied items 4,770 FCO No. 103
c) Furnish and install 10" stainless steel pipe fittings
to connect flame arrestor on digester 12. varied items 4,688 FCO No. 124
d) Furnish and install 12" plug valve and tee to facilitate
digester gas tie-in to the interplant gas line. 1 each 13,984 FCO No. 126
e) Replace 12" epoxy coated steel gas pipe with 12"
polyethylene pipe. Remove conflicting concrete encased
electrical duct bank. Concrete encase portions of the
gas pipeline due to inadequate ground cover. 475 LF 11,595 FCO No. 142
f) Relocate existing 1 %"water line that conflicts with
the installation of a covered entry at digesters 7 and 8
pump room. 6 LF 1,106 FCO No. 183
g) Add 2-20" butterfly valves and modify stainless steel
gas piping in the basement of the gas compressor
building. Deduct one gas compressor shutdown and
purging of low pressure gas piping system. 2 each 4,336 FCO No. 215
h) Furnish labor and material to install added FRP fittings
as required to complete the ventilation system at
Plant 1. 21 each 21,182 FCO No. 243
This additional work was negotiated with the Contractor pursuant to Section 43 (B) 1) of the General
Requirements, Division 01.
ADDED COST THIS CHANGE ORDER ITEM: $65,251.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 4 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Five 5
Date: February 25, 2004
Job: Area Classification Study Implementation Plan, Plant Nos. 1 and 2. Job No. J-35-2
Consultant: Parsons/Lee & Ro
ITEM 4— MECHANICAL MODIFICATIONS AT PLANT NO. 2
The Contractor was directed to furnish labor, materials and install mechanical modifications that meet
classified area requirements and were not shown on the contract documents. A summary of the items
and associated costs are as follows:
Item Quantity Cost Reference
a) Modify 20" stainless steel piping in the gas storage
tank and gas compressor basement to eliminate
welding in the basement and delete one shutdown
of the gas compressor to tie in the new piping. varied items $ 8,900 FCO No. 214
b) Modify 20" stainless steel piping to avoid conflict with
existing piping and add 4" x 10" drain reservoir in
Scott Tunnel. varied items 18,062 FCO No. 218
c) Furnish labor and material to install added FRP fittings
as required to complete the ventilation system at
Plant No. 2. 26 each 22,051 FCO No. 243
This additional work was negotiated with the Contractor pursuant to Section 43 (B) 1) of the General
Requirements, Division 01.
ADDED COST THIS CHANGE ORDER ITEM: $49,013.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
3
Page 5 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Five 5
Date: February 25, 2004
Job: Area Classification Study Implementation Plan, Plant Nos. 1 and 2, Job No. J-35-2
Consultant: Parsons/Lee & Ro
ITEM 5—STRUCTURAL MODIFICATIONS AT PLANT NOS. 1 AND 2
The Contractor was directed to furnish labor, materials and install mechanical and structural
modifications that meet classified area requirements and were not shown on the contract documents.
A summary of the items and associated costs are as follows:
Item Quantity Cost Reference
a) Repair gas leak under bridge in the existing concrete
on digester 9 at Plant No. 1, using epoxy injection. 1 each $ 3,664 FCO No. 125
b) Furnish labor and materials to construct a new concrete
valve vault on the Interplant digester gas line at Plant
No. 1. The vault was constructed to enclose the new 20"
valve and tee installed under FCO#126. 1 each 21,412 FCO No. 146
c) Furnish and install anodized aluminum handrails on the
existing bridge between digesters P and Q at Plant No 2. 32 LF 8,996 FCO No. 155
d) Remove and replace lightweight concrete roof decking
to support new digester gas pipe supports on the gas
compressor building roofs at Plant Nos. 1 and 2. The
existing decking was in a deteriorated condition and
was replaced with epoxy grout. 16 locations 11,884 FCO No. 181
e) Modify steel supports for stainless steel cover plate
at entry to pump room at digesters I and J at Plant
No. 2. varied items 1,472 FCO No. 221
f) Furnish and install anodized aluminum handrail on the
existing pump room roof between digesters A and B at
Plant No. 2. The existing handrail was in a deteriorated
condition and a safety hazard. 12 LF 1,800 FCO No. 222
g) Add safety side rails to the new ladder being constructed
to access the roof of the gas compressor building at
Plant No. 2. The side rails were added for protection of
OCSD maintenance personnel. 1 each 1,337 FCO No. 229
D
Page 6 of 7
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Five 5
Date: February 25, 2004
Job: Area Classification Study Implementation Plan, Plant Nos. 1 and 2, Job No. J-35-2
Consultant: Parsons/Lee & Ro
This additional work was negotiated with the Contractor pursuant to Section 43 (B) 1) of the General
Requirements, Division 01.
ADDED COST THIS CHANGE ORDER ITEM: $50,565.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL COSTS THIS CHANGE ORDER: $214,954.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that no extension of time
to perform the work is required for this Change Order, and that no direct or indirect, incidental or
consequential costs, expenses, losses or damages have been or will be incurred by Contractor,
except as expressly granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: September 16, 2002
Original Contract Time: 1,006 Calendar Days
Original Completion Date: June 17, 2005
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 0 Calendar Days
Revised Contract Time: 0 Calendar Days
Revised Completion Date: Not Applicable
Time Subject to Liquidated Damages: Not Applicable
Actual Final Completion Date: Not Applicable
Original Contract Price $ 14,066,442.00
Prev. Authorized Changes $ 664,914.00
This Change (Add) (Dedwt) $ 214,954.00
Amended Contract Price $ 14,946,310.00
e
' Page 7 of 7
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: Five 5
Date: February 25, 2004
Job: Area Classification Study Implementation Plan, Plant Nos. 1 and 2, Job No. J-35-2
Consultant: Parsons/Lee & Ro
Board of Directors Authorization Date: February 25, 2004
ORANGE COUNTY SANITATION DISTRICT
Submitted by:
John D. Linder, P.E. Date
Construction Manager
Approved by:
David A. Ludwin, P.E. Date
Director of Engineering
Accepted by:
J.F. SHEA CONSTRUCTION, INC.
Contractor Date
EDMS 003761533
Lf76
pt 4 .ncJursJ�,� k mil�1r'•`. :F v;f� ♦'/�••-- 'I l
`'� � :�� •��� •�., Syr
.6id m7.4-0 1, 0
71LO
, . . . . • .I mIS�mO ,I '1 ��_.�.1�11� �,`I,i_ a
i'. _.�' `�S!� •+ ;, , ' ♦ � •it;lil 2 j _- I, '� vv-e��n��n 1 n'; � �■
CD
uj
Z .i� . -Vj 1. ]aM � `' •/ �''�`_ .._ I 1 •��(S »►�. j y
1, '
r
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-02 13 c
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Dean Fisher, Senior Engineer
SUBJECT: PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES.
JOB NO. P1-37
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No.12 to Primary Clarifiers 16-31 and Related Facilities, Job
No. P1-37, with Margate Construction, authorizing an addition of S22.390, increasing
the total contract amount to $71 ,241 ,204.
SUMMARY
Background
• Job No. P1-37, Primary Clarifiers 16-31 and Related Facilities, includes the
construction of 16 new primary clarifiers with all support equipment, improvements to
existing Primary Clarifiers 6-15, and improvements to Primary Clarifiers 1-5.
• Brown and Caldwell prepared the plans and specifications and the contract was
awarded to Margate Construction on October 24, 2001 .
• This change order includes six items of additional work, and two items of deleted
work. There are no errors and two omissions associated with this change order.
There is no time extension associated with this change order. Liquidated damages
on this project are S3,000 per day and there are no bonus provisions.
Contract Schedule
Contract Start Date January 7, 2002
Original Contract Completion Date November 7, 2005
Total Number of Change Orders to Date 12
Current Contract Completion Date April 8, 2006
Actual Completion Date N/A
Days Subject to Liquidated Damages 0
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\I1em 13(c).Margate.doc
Revised: 6/04/03 Page 1
w
e
Change Order Content
Item
No. Description Amount Days Type
1 Temporary Power for Exhaust Fans 2,928 0 Design Change
2 Flashing Modification 958 0 Design Change
3 PLC Panel Modifications (-3,106) 0 Design Change
4 Generator Inputs Additions 13,919 0 Design Change
5 Add Circuits For Blower Motor Heaters 2,552 0 Omission
6 Upgrade Electrical Cable 3,061 0 Omission
7 Delete Motor Heater Conductors (-1,000) 0 Design Change
8 Switchgear PLC Relocation 3,078 0 Design Change
Total Change Order $22,390 0
Job Completion
The project is 68% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on October 24, 2001 .
Please refer to the attached Change Order Status Report for more information on
previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 70,366,000
Previously Authorized Changes $ 852,814
This Change $ 22,390
Change Orders to Date $ 875,204
Percentage Increase to Date 1 .240%
Amended Contract Price $ 71,241 ,204
BUDGET IMPACT
® This item has been budgeted. (Line item: Section 8, CIP, P1-37)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
H:\dept\agenda\Board Agenda Repons\2004 Board Agenda Reports\0204\Item 13(c).Margate.doc
Revised: 6/04/03 Page 2
0
ADDITIONAL INFORMATION
None.
ALTERNATIVES
No alternatives are proposed.
CEQA FINDINGS
This project was included in the Strategic Plan EIR that was certified on October 27,
1999. A Notice of Determination was filed on October 29, 1999.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
GC:ms
HAntgloba!\Agenda Draft Reports\PDC\P1-37 AR C0#12 020504.doe
H:\depMgenda\Board Agenda Reports\2004 Board Agenda Reports\0204Utem 13(c).Margate.doc
Revised: 6/04/03 Page 3
4
BUDGET INFORMATION TABLE
Primary Clarifiers No.16-31 and Related Facilities
Job No.P7-37
ORTWrIAL CURRENT PROPOSED PROPOSED FUNDS Tt9S PROPOSED ESTIMATED ESTIMATED
PROJI:C:T:PHASE aUTHORQED PROJECT BUDGET REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE TO EXPENDED
BUDGET BUDGET INCREASE BUDGET TO DATE REQUEST AUTHORIZATION DATE TO DATE(%)
Phan 1-Prolotl Development S 77.000 77.000 S 77.000 S 77.000 S 76.g74 100°.
Phase 2-Prelininary Desl n S 315.0DO 315.000 S 315.000 $ 315,000 S 31S.552 100'.
Phase 3-Design S 4.542.000 4.542.000 S 4.542.000 $ 4.542,000 S 4.546.501 100°.
Phase 4-Construction S 77.S64.656 S 22.3W S 775874046 S 77,S4064.656 S 22.390 S 77.587.046 S 50.90C400 W.
Phases-Commosionina S 281,880 $ 281.880 $
Phase6-CWoout S 50.000 S 50.000 1 E
Phase 7,Coirt,ngricy S 5.730,464 22:390 S 5,708074
S
PROJECT TOTAL I $ 88.561000 $ - S 88.561.000 S SSA,13,427 68'.
Remtwrsade Goas
PROJECT NET S 88,561,OO11 i S 88.561.000 S 82498.656 S M.3gd S .2521.048 S 55.843,427 88°.
PSA/Contrect
LD,,j,PSA f 5.205.SX14 S 5205.904 E 5.205.904 f 5.205.904S 4.801.300'in Nan Contract S 71.211341111 22.390 S 71241.204 S 71,218,814 $ 22,300 S 71.241.204 1 S 48.118.000 68°.
Note:Authorized Furls and Expenditures to Date in Phase 4 include Construction Administration and Inspection costs from previous phasing prior to 7/1/03.
a
CHANGE ORDER STATUS REPORT
PRIMARY CLARIFIERS 16-31 AND RELATED FACILITIES
JOB NO.P1-37
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM TIME TO DATE
DATE COST TO DATE INCREASE
(DAYS) (DAYS)
CONTRACT 6/23/1999 $ 70,366,000.00 $ 70,366,000.00 0.00 1400 1400
CO NO.1 12/19/2001 $ - $ 70,366,000.00 0.00 0 1400
CO NO.2 8/1/2002 $ 75,214.00 $ 70,441,214.00 0.11 49 1449
"CO NO.3 10/21/2002 $ 48,736.00 $ 70,489,950.00 0.18 0 1449
CO NO.4 12/18/2002 $ 356,059.00 $ 70,846,009.00 0.68 82 1531
CO NO.5 2/26/2003 $ 33,527.00 $ 70,879,536.00 0.73 0 1531
CO NO.6 4/23/2003 $ 54,992.00 $ 70,934,528.00 0.81 21 1552
CO NO.7 6/25/2003 $ 14,750.00 $ 70,949,278.00 0.83 0 1552
CO NO.8 8/27/2003 $ 5,363.00 $ 70,954,641.00 0.84 0 1552
CO NO.9 10/22/2003 $ 187,452.00 $ 71,142,093.00 1.10 0 1552
CO NO.10 11/19/2003 $ 56,041.00 $ 71,198,134.00 1.18 0 1552
CO NO.11 Pending $ 20,680.00 $ 71,218,814.001 1.21 0 1552
CO NO.12 P@ndl $ 22,390 d0. -$ 71,241,204,00 1.24 01 . ' 1b52
Approved by PDC Committee per delegated authority by Board Resolution 99-23
Approved by General Manager per delagated authority by Board Resolution 99-23
A
Page 1 of 5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twelve (12)
Date: February 25, 2004
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37
Consultant: Brown and Caldwell
Amount of this Change Order (Add)(t st) $22,390.00
In accordance with contract provisions,the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 —TEMPORARY POWER FOR EXHAUST FANS
This item provides an interim power connection for two exhaust fans located on top of the existing P1-
33 scum gallery. The existing fans (11 CFAN239 and 11 CFAN240) are specified to be relocated
during the construction of the proposed PC 6-31 Control Buildings. The plans provided for interim
removal of the fans, but did not provide for an interim power connection. At the Design Phase it was
planned that these fans would not operate during the relocation period. During construction, it was
determined that the fans need to remain in service in order to comply with the District's policy of
meeting the safety requirements of NPFA 820. An interim power connection is needed because the
permanent power connection can not be constructed prior to construction of the Control Buildings.
The work was accomplished on contractor's force account pursuant to Section 48 (B) 2 of the General
Requirements (Reference FCO-P137-007).
ADDED COST THIS CHANGE ORDER ITEM: $2,928.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2—FLASHING MODIFICATION
This item modifies the specified roof flashing in four locations where a ladder connects to the roof of
power building 7. This flashing is necessary in order to seal the roof from the weather and rain. Staff
recommends this modification as an improvement for this difficult area, due to the nature of the
building and the ladder design. This improvement is anticipated to more effectively mitigate differential
movement between the ladder and the roofing system. The work was accomplished on contractor's
force account pursuant to Section 48 (B) 2 of the General Requirements (Reference FCO-P137-142).
ADDED COST THIS CHANGE ORDER ITEM: $958.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
A
Page 2of5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twelve 02)
Date: February 25, 2004
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37
Consultant: Brown and Caldwell
ITEM 3— PLC PANEL MODIFICATIONS
This item provides two NEMA 12 PLC enclosures in lieu of the specified NEMA 4x enclosures. The
modified panels are 11 HPNL001 (Polymer Facility) and 11 IPNL001 (Scrubber Complex). This change
provides a lower cost PLC panel which is more appropriate for the application. The specified NEMA
4x is a heavy-duty stainless steel panel typically used in outdoor applications. These panels will be
located indoors and do not require weather proofing. Existing panels in these and other similar
locations in the Plant are NEMA 12 type panels. The costs associated with this Change Order item
were negotiated with the Contractor pursuant to Section 48 (B) 1 of the General Requirements
(Reference FCO-P137-146).
CREDIT THIS CHANGE ORDER ITEM: $(3,106.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4—GENERATOR INPUT ADDITIONS
This item provides additional digital input signals related to the emergency generator to indicate the
generator battery status, fuel tank level, ready to trip status, and UPS status. The inputs were
requested by staff in order to provide additional monitoring to improve operation and reliability of the
emergency generator. The costs associated with this Change Order item were negotiated with the
Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference FCO-P137-147).
ADDED COST THIS CHANGE ORDER ITEM: $13,919.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 5—ADD CIRCUITS FOR BLOWER MOTOR HEATERS
This item adds electrical circuits for three blower motors located in the Primary Clarifier 6-31 Gallery.
Motor heaters prevent potential corrosion associated with condensation. This occurs in moist
environments when motors sit idle. The agitation air blower motors were equipped with motor heaters,
but the 120V circuit for energizing the heater was not included in the design. The change adds
approximately 40 feet of 3/a" PVC-coated galvanized conduit, and 140 feet of electric cable.The costs
associated with this Change Order item were negotiated with the Contractor pursuant to Section 48 (B)
1 of the General Requirements (Reference FCO-P137-148).
ADDED COST THIS CHANGE ORDER ITEM: $2,552.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
4
Page 3 of 5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twelve (12)
Date: February 25, 2004
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37
Consultant: Brown and Caldwell
ITEM 6— UPGRADE ELECTRICAL CABLE
This item provides multiple conductor, tray-rated cable in lieu of the specified single conductor cable.
The specified cable is not in compliance with the National Electric Code (NEC) requirements for cable-
tray installation. The change replaces approximately 18,000 feet of single conductor cable with 6,000
feet of multiple (3) conductor cable. The costs associated with this Change Order item were
negotiated with the Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference
FCO-P137-149).
ADDED COST THIS CHANGE ORDER ITEM: $3,061.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 7— DELETE MOTOR HEATER CONDUCTORS
This item provides a credit to delete specified motor heater conductors . Conductors were provided on
the plans for motor heaters. The size of motors involved with this change are not commonly
manufactured with motor heaters, and are not required by District standards. Therefore the conductors
are of no benefit and will be deleted, reducing costs to the project. This change affects (26) sludge
collectors, (16) thick sludge pumps, (12) scum pumps, and (6) polymer feed pumps. The costs
associated with this Change Order item were negotiated with the Contractor pursuant to Section 48 (B)
1 of the General Requirements (Reference FCO-P137-151).
CREDIT THIS CHANGE ORDER ITEM: $(1,000.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 8 — SWITCHGEAR PLC RELOCATION
This item changes the location of the Switchgear PLC in Power Building 7 from Switchgear
18KSWGRO07 to Control Panel 18KPNL002. This change will allow District personnel to maintain the
PLC without entering an switchgear enclosure, enhancing safety, and rendering the installation similar
to other District PLC panels. The costs associated with this Change Order item were negotiated with
the Contractor pursuant to Section 48 (B) 1 of the General Requirements (Reference FCO-P137-152).
ADDED COST THIS CHANGE ORDER ITEM: $3,078.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COST THIS CHANGE ORDER: $22,390.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
4
Page 4 of 5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twelve (12)
Date: February 25, 2004
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37
Consultant: Brown and Caldwell
The additional work contained in this Change Order can be performed incidental to the prime work and
within the time allotted for the original Contract and any extensions to the Contract time made by this
and all previously issued Change Orders. It is therefore mutually agreed that no extension of time to
perform the work is required for this Change Order. District and Contractor agree that the added cost
described above constitutes full and equitable consideration for all the impacts incurred by the
Contractor, and no other direct or indirect, incidental or consequential costs, expenses, losses or
damages have been or will be incurred by Contractor, except as expressly granted and approved by
this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: January 7, 2002
Original Contract Time: 1,400 Days
Original Completion Date: November 7, 2005
Time Extension this C.O.: 0 Days
Total Contract Time Extension: 152 Days
Revised Contract Time: 1,552 Days
Revised Final Completion Due Date: April 8, 2006
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: N/A
Original Contract Price $ 70,366,000.00
Prev. Authorized Changes $ 852,814.00
This Change (Add) (DedUet) $ 22,390.00
Amended Contract Price $ 71,241,204.00
y
Page 5of5
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Margate Construction, Inc. C.O. No.: Twelve (12)
Date: February 25, 2004
Job: Primary Clarifiers 16-31 and Related Facilities, Job No. P1-37
Consultant: Brown and Caldwell
Board Authorization Date: February 25, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
John D. Linder, P.E. Date
Construction Manager
Approved by:
David A. Ludwin, P.E. Date
Director of Engineering
Accepted by:
MARGATE CONSTRUCTION
Contractor Date
EDMS/003761026
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-03 13(d)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Tod Haynes, Engineering Supervisor
SUBJECT: PROFESSIONAL SERVICES AGREEMENT FOR MATERIALS
TESTING AND GEOTECHNICAL ENGINEERING SERVICES,
SPECIFICATION NO. PSA-2001-33BD
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 3 to the Professional Services Agreement with Ninyo
& Moore, to provide for Materials Testing, Inspection, and Geotechnical
Engineering Services, Specification No. PSA-2001-33BD, for FY2003/04 for an
additional amount not to exceed $75,000.
SUMMARY
• In May 2001 , the Board of Directors approved a Professional Services
Agreement (PSA) with Ninyo & Moore for FY2001/02, with the option to
renew for two additional one-year periods in FY 2002/03 and FY2003/04.
• The agreement was renewed for FY2003/04 on July 1, 2003. Staff has
determined that additional materials testing, inspection, and geotechnical
engineering services are required on capital projects for FY2003/04, and that
the existing contract limits are not sufficient.
• The PSA amount for this consultant will be used on an as-needed basis.
Testing services are budgeted on each capital project as required. All
services will be charged to the project budgets.
PRIOR COMMITTEE/BOARD ACTIONS
Please see the attached Professional Services Agreement (PSA) Status Report.
PROJECT/CONTRACT COST SUMMARY
The renewal of the agreement for FY2003/04 was Board approved last year.
The amount for the renewal was derived by Staff in 2001 using anticipated
capital projects for FY2003/04 and considered average survey hours of past
years.
K\deptlagenda\Board Agenda Reports\2004 Board Agenda Reports\0204\I1em 13(d).Ninyo Moore.doc
Revised: 8120,'98 Page 1
L
1
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
This item does not impact the overall budget because it is not paid separately as
a lump sum item. Materials testing and geotechnical services funds have been
included in the individual project budgets that require these services. They are
expensed as the services are used on the projects.
ADDITIONAL INFORMATION
In May 2001 , the Board of Directors approved agreements with three materials
testing firms to provide professional services for FY2001/02, FY2002/03,
and FY2003/04. The agreements were with Ninyo & Moore, Converse
Consultants, and Law Crandall Associates.
During FY2001/02, Law Crandall Associates closed the Orange County office
and Converse Consultants went out of business.
Staff projected at that time that only one of the consultants needed to be
replaced. In June 2002, the Board of Directors approved a PSA with Smith
Emery Geoservices to provide services for FY2002/03 and FY2003/04.
This year, FY2003/04, construction volume is greater than anticipated and
additional testing services are required.
Staff recornmends amending the existing contracts in lieu of seeking a third
contract.
This year is the last year for the existing agreements. Staff is currently
requesting proposals from qualified testing companies for FY2004/05,
FY2005/06, and FY2006/07.
ALTERNATIVES
N/A
ATTACHMENTS
1 . Scope of Work
2. Fee Schedule with Escalation Rates 2003/2004
3. PSA Status Report
TH:lc:ba
HAdept\agenda\Board Agenda Reports12004 Board Agenda Reports\0204Utem 13(d).Ninyo Moore.doc
Revised: 8/20/98 Page 2
ATTACHMENT A
SCOPE OF WORK
For
MATERIALS TESTING, INSPECTION, AND OTHER GEOTECHNICAL SERVICES
FOR COLLECTION SYSTEM AND TREATMENT PLANT PROJECTS
SPECIFICATION NO. PSA-2001-33BD
TYPICAL TASKS
SOILS: Provide lab testing for maximum density, sieve analysis and
soil identification. Field-test compacted soil using sandcone
and nuclear density meter methods. Inspect compaction
efforts by contractors to achieve specification-required
densities. On a less frequent basis, be prepared to conduct
soil sampling to depths as required by the District.
CONCRETE/MASONRY: Provide concrete, mortar and grout cylinder compressive
testing, masonry prism test, and shear test on brick cores.
Pick up test specimen from construction sites.
ASPHALT: Provide density field testing and core sample collection and
lab testing. Inspect compaction efforts by contractors to
achieve specification-required densities.
METALS: Provide tensile strength lab testing. Provide field testing for
welds and inspect welding operations.
REQUIREMENTS
1. Field technician shall be available upon 24-hour notice.
2. Invoices shall be coded with District assigned project title and job or contract
number along with an adequate work description of the services provided.
3. All test results shall be clearly summarized in a standard report format and
submitted to the District.
1
4. Field technicians shall provide a detailed daily report for each day of field testing
and observation.
5. Field technicians shall be available for occasional night work upon 24-hour
advance notice.
6. Equipment that requires calibration shall be calibrated prior to the work.
Calibration costs shall be included in the total hourly rate for field service fees.
G:\wp.dta\eng\JOBS&CONTRACTS\Soils,Survey,E-Testing Contracts FY 01-04\Soils\Soils SOW 2001 to 2004.doc
ATTACHMENT B
SOILS, MATERIALS TESTING: SMITH-EMERY FEE SCHEDULE
A. Lab Testing Fees
All-Inclusive Unit Prices
Pick-Up, each 7/1/02-6/30/03 7/1/03-6/30104
A.I Soils
A.1.1 Maximum Density: N/C $100.00 $100.00
A.1.2 Sieve Analysis: N/C $50.00 $50.00
A.1.3 Soil Identification: N/C $100.00 $100.00
A.2 Masonry and Concrete
A.2.1 Concrete Compressive Strength: $10.00 $14.00 $14.00
A2.2 Shear Test on Brick Cores: $9.00 $50.00 $50.00
A2.3 Mortar/Grout Compression Test: $10.00 $19.00/$25.00 $19.00/$25.00
A.2.4 Masonry Prism Test: $39.00 $144.00 $144.00
A.3 Asphalt
A.3.1 Core Sample Testing: $40.00 $35.00 $35.00
A.4 Metals
A.4.1 Tensile Strength: $19.00 $28.00 $28.00
(Escalation rate for Lab Testing Fees=0%)
B. Field Service Fees
All-Inclusive Hourly Rates
7/1/02-6130/03 7/1/03-6/30/04
B.I Soils
B.1.1 Compaction Testing/inspection: Esc. Rate: 2% $55.50 $56.61
B.2 Masonry and Concrete
B.2.1 Test Specimen Pick-U Unit Rate : see above see above
B.3 Asphalt
B.3.1 Compaction Inspection/Density Test: Esc.Rate: 2% $55.50 $56.61
B.4 Metals
B.4.1 Welding Inspection: Esc. Rate: 3% $65.00 $66.95
B.4.2 Dye Penetrant Testing: Esc. Rate: 3%, $69.00 $71.07
8.4.3 Ultrasonic Testing: Esc.Rate: 3% $69.00 $71.07
C. Other Fees
7/1/02-6/30/03 7/1/03-6/30/04
CA Travel Time/Mileage Charge for Field included in fees included in fees
Work and Test Specimen Pick-Up: above above
C.2 Minimum Daily Call-Out Charge: 2 hrs 2 hrs
C.3 Soils Sampling with Truck- Esc.Rate: 0% $14.00/foot+ $14.00/foot+
Mounted Auger: $70.00/hour $70.001hour
CA Licensed Senior Geotechnical Engr. Esc.Rate: 2% $80.00/hour $81.60
Professional Services Agreement Status Report
Materials Testing and Geological Engineering Services
PSA-2001-33BD
Total Project Budget: $80,000 FY 01/02, $130,000 FY-02/03, $100,000 FY-03/04, $75,000 FY-03/04
Consultant: Ninyo & Moore
Start Date of Project: July 1, 2001
Date Addendum Description Cost Accumulated
Costs
07/01/01 Original Materials testing, inspection and geotechnical
PSA engineering for capital projects FY 01/02 $80,000 N/A
07/01/02 1 Materials testing, inspection and geotechnical
en ineering for capital projects FY 02/03 $130,000 N/A
07/01/03 2 Materials testing, inspection and geotechnical
en in ering for capital projects FY 03/04 $100,000 N/A
Pending 3 Materials testing, inspection and geotechnical
en ineering for capital projects FY 03/04 $75,000 N/A
G:\wp.dta\eng\CM Misc\So[Is&SurveyContracts\PSA Status Report-Ninyo Moore-PSA2001-33BD.doc 01/12/04
-r -
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-04 13(e)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Tod Haynes, Engineering Supervisor
SUBJECT: PROFESSIONAL SERVICES AGREEMENT FOR MATERIALS
TESTING AND GEOTECHNICAL ENGINEERING SERVICES,
SPECIFICATION NO. PSA-2002-33BD
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 2 to the Professional Services Agreement with Smith
Emery GeoServices, to provide for additional Materials Testing, Inspection, and
Geotechnical Engineering Services, Specification No. PSA-2002-33BD, for
FY2003/04 for an additional amount not to exceed $75,000.
SUMMARY
• In June 2002, the Board of Directors approved a Professional Services
Agreement (PSA) with Smith Emery GeoServices for FY2002/03, with the
option to renew for one additional one-year period for FY2003/04, and that
the existing contract limits are not sufficient.
• The agreement was renewed for FY2003/04 in June 2003. Staff has
determined that additional materials testing, inspection, and geotechnical
engineering services are required on capital projects for FY2003/04.
• The PSA amount for this consultant will be used on an as-needed basis.
Testing services are budgeted on each capital project as required. All
services will be charged to the project budgets.
PRIOR COMMITTEE/BOARD ACTIONS
Please see the attached PSA Status Report.
PROJECT/CONTRACT COST SUMMARY
The renewal of the agreement for FY2003/04 was Board approved last year.
The amount for the renewal was derived by Staff in 2001 using anticipated
capital projects for FY2003/04 and considered average survey hours of past
years.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Repor1s10204\Item 13(e).Smith Emery Geo Services.doc
Revised: 8/20/98 Page 1
4. Field technicians shall provide a detailed daily report for each day of field testing
and observation.
5. Field technicians shall be available for occasional night work upon 24-hour
advance notice.
6. Equipment that requires calibration shall be calibrated prior to the work.
Calibration costs shall be included in the total hourly rate for field service fees.
G:1wp.dta\eng\JOBS&CONTRACTS\Soils,Survey,E-Testing Contracts FY 01-04\Soils\Soils SOW 2001 to 2004.doc
7
PDC COMMITTEE Meeting Date To Bd. of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-04 13(e)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Tod Haynes, Engineering Supervisor
SUBJECT: PROFESSIONAL SERVICES AGREEMENT FOR MATERIALS
TESTING AND GEOTECHNICAL ENGINEERING SERVICES,
SPECIFICATION NO. PSA-2002-33BD
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 2 to the Professional Services Agreement with Smith
Emery GeoServices, to provide for additional Materials Testing, Inspection, and
Geotechnical Engineering Services, Specification No. PSA-2002-3313D, for
FY2003/04 for an additional amount not to exceed S75,000.
SUMMARY
• In June 2002, the Board of Directors approved a Professional Services
Agreement (PSA) with Smith Emery GeoServices for FY2002/03, with the
option to renew for one additional one-year period for FY2003/04, and that
the existing contract limits are not sufficient.
• The agreement was renewed for FY2003/04 in June 2003. Staff has
determined that additional materials testing, inspection, and geotechnical
engineering services are required on capital projects for FY2003/04.
• The PSA amount for this consultant will be used on an as-needed basis.
Testing services are budgeted on each capital project as required. All
services will be charged to the project budgets.
PRIOR COMMITTEE/BOARD ACTIONS
Please see the attached PSA Status Report.
PROJECT/CONTRACT COST SUMMARY
The renewal of the agreement for FY2003/04 was Board approved last year.
The amount for the renewal was derived by Staff in 2001 using anticipated
capital projects for FY2003/04 and considered average survey hours of past
years.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 13IeI.Smith Emery Geo Services.doc
Revised: 8/20/98 Page 1
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
This item does not impact the overall budget because it is not paid separately as
a lump sum item. Materials testing and geotechnical services funds have been
included in the individual project budgets that require these services. They are
expensed as the services are used on the projects.
ADDITIONAL INFORMATION
In May 2001, the Board of Directors approved agreements with three materials
testing firms to provide professional services for FY2001/02, FY2002/03, and
FY2003/04. The agreements were with Ninyo & Moore, Converse Consultants,
and Law Crandall Associates.
During FY2001/02, Law Crandall Associates closed the Orange County office
and Converse Consultants went out of business.
Staff projected at that time that only one of the consultants needed to be
replaced. In June 2002, the Board of Directors approved a PSA with Smith
Emery Geoservices to provide services for FY2002/03 and FY2003/04.
This year, FY2003/04, construction volume is greater than anticipated and
additional testing services are required.
Staff recommends amending the existing contracts in lieu of seeking a third
contract.
This year is the last year for the existing agreements. Staff is currently
requesting proposals from qualified testing companies for FY2004/05,
FY2005/06, and FY2006/07.
ALTERNATIVES
N/A
ATTACHMENTS
1 . Scope of Work
2. Fee Schedule with Escalation Rates 2003/04
3. PSA Status Report
TH:lc:ba:lc
H:\depl\agenda\Board Agenda Reports\2004 Board Agenda Reports\0_104\11em 13(e).Smi1h Emery Geo Services.doc
Page 2
Revised: 8/20,198
ATTACHMENT A
SCOPE OF WORK
For
MATERIALS TESTING, INSPECTION, AND OTHER GEOTECHNICAL SERVICES
FOR COLLECTION SYSTEM AND TREATMENT PLANT PROJECTS
SPECIFICATION NO. PSA-2001-33BD
TYPICAL TASKS
SOILS: Provide lab testing for maximum density, sieve analysis and
soil identification. Field-test compacted soil using sandcone
and nuclear density meter methods. Inspect compaction
efforts by contractors to achieve specification-required
densities. On a less frequent basis, be prepared to conduct
soil sampling to depths as required by the District.
CONCRETE/MASONRY: Provide concrete, mortar and grout cylinder compressive
testing, masonry prism test, and shear test on brick cores.
Pick up test specimen from construction sites.
ASPHALT: Provide density field testing and core sample collection and
lab testing. Inspect compaction efforts by contractors to
achieve specification-required densities.
METALS: Provide tensile strength lab testing. Provide field testing for
welds and inspect welding operations.
REQUIREMENTS
1. Field technician shall be available upon 24-hour notice.
2. Invoices shall be coded with District assigned project title and job or contract
number along with an adequate work description of the services provided.
3. All test results shall be clearly summarized in a standard report format and
submitted to the District.
1
4. Field technicians shall provide a detailed daily report for each day of field testing
and observation.
5. Field technicians shall be available for occasional night work upon 24-hour
advance notice.
6. Equipment that requires calibration shall be calibrated prior to the work.
Calibration costs shall be included in the total hourly rate for field service fees.
G:\wp.dta\eng\JOBS&CONTRACTS\Soils,Survey,E-Testing Contracts FY 01-04\Soils\Soils SOW 2001 to 2004.doc
7
ATTACHMENT B
SOII:& MATERIALS TESTING: SMITH-EMERY FEE SCHEDULE
A. Lab Testing Fees
All-Inclusive Unit Prices
Pick-Up, each 7/1/02-6/30/03 7/1/03-6/30/04
A.1 Soils
A.1.1 Maximum Density: N/C $100.00 $100.00
A.1.2 Sieve Analysis: N/C $50.00 $50.00
A.1.3 Soil Identification: N/C $100.00 $100.00
A.2 MasonjX and Concrete
A.2.1 Concrete Compressive Strength: $10.00 $14.00 $14.00
A.2.2 Shear Test on Brick Cores: $9.00 $50.00 $50.00
A.2.3 Mortar/Grout Compression Test: $10.00 $19.00/$25.00 $19.00/$25.00
i
A.2.4 Masonry Prism Test: $39.00 $144.00 $144.00
A.3 Asphalt
A.3.1 Core Sample Testing: $40.00 $35.00 $35.00
A 4 Metals
A.4.1 Tensile Stren h: $19.00 $28.00 $28.00
(Escalation rate for Lab Testing Fees=09A)
B. Field Service Fees
All-Inclusive Hourly Rates
7/1/02-6130/03 7/1103-6/30/04
B.1 Soils
B.1.1 Compaction Testing/Inspection: Esc.Rate: 2% $55.50 $56.61
B.2 Masonry and Concrete
B.2.1 Test Specimen Pick-Up Unit Rate): see above see above
B.3 Asphalt
B.3.1 Compaction Inspection/Density Test: Esc.Rate: 2% $55.60 $56.61
B.4 Metals
B.4.1 Welding Inspection: Esc.Rate: 3% $65.00 $66.96
B.42 Dye Penetrant Testing: Esc.Rate: 3% $69.00 $71.07
B.4.3 Ultrasonic Testing: Esc.Rate: 3% $69.00 $71.07
C. Other Fees
7/1/02-6130103 711/03-6130/04
CA Travel Time/Mileage Charge for Field included in fees included in fees
Work and Test Specimen Pick-Up: above above
C.2 Minimum Daily Call-Out Charge: 2 hrs 2 hrs
C.3 Soils Sampling with Truck- Esc.Rate: 0% $14.00/foot+ $14.00/foot+
Mounted Auger: $70.001hour $70.00/hour
CA Licensed Senior Geotechnical En r. Esc. Rate: 2% 1 $80.001hour $81.60
Professional Services Agreement Status Report
Materials Testing and Geological Engineering Services
PSA-2002-33BD
Total Project Budget: $130,000 FY-02/03, $100,000 FY-03/04, $75,000 FY-03/04
Consultant: Smith-Emery GeoServices
Start Date of Project: July 1, 2002
Date Addendum Description Cost Accumulated
Costs
07/01/02 Original Materials testing, inspection and geotechnical
PSA engineering for capital projects FY 02/03 $130,000 N/A
07/01/03 1 Materials testing, inspection and geotechnical
engineering for capital projects FY 03/04 $100,000 N/A
Pending 2 Materials testing, inspection and geotechnical
engine rin for capital projects FY 03/04 $75,000 1 N/A
G:1wp.dtaleng\CM Misc\Soils&SurveyContracts\PSA Status ReportSMith Emery-PSA2002-33BD.doc 01/12/04
f
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC 04-05 13(
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Tod Haynes, Engineering Supervisor
SUBJECT: PROFESSIONAL SERVICES AGREEMENTS FOR SURVEYING
SERVICES, SPECIFICATION NO. PSA-2001-34BD
GENERAL MANAGER'S RECOMMENDATION
Approve Amendment No. 3 to the Professional Services Agreements with MDS
Consulting and Bush & Associates, to provide for additional Surveying Services,
Specification No. PSA-2001-34BD, for FY2003/04 for an additional amount not to
exceed $75,000 for each agreement ($150,000 total).
SUMMARY
• In May 2001 , the Board of Directors approved Professional Services
Agreements (PSA) with Bell Land Surveying, MDS Consulting, and Bush &
Associates for FY2001/02, with the option to renew for two additional one-
year periods for FY2002/03 and FY2003/04.
• Staff has determined that additional surveying services are required on capital
projects during FY2003/04 and that the existing contract limits are not
sufficient.
• The Bushard Trunk Sewer Project, Contract No. 1-2-4, has required more
surveying services than normally anticipated to document alignment and
settlement of the 108" reinforced concrete pipe. Additionally, the third
consultant, Bell Land Surveying, is unable to provide resources for the
project.
• Unanticipated Surveying Services were required for the Trunk Sewer and
Mapping Project this fiscal year.
• The PSA amounts for each consultant will be used on an as-needed basis.
Surveying services are budgeted on each capital project as required. All
services will be charged to the project budgets.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports102041dtem 13i0.MDS Consulting.doc
Revised: 8/20/98 Page 1
i
r
PRIOR COMMITTEE/BOARD ACTIONS
Please see the attached Professional Services Agreement (PSA) Status Report.
PROJECT/CONTRACT COST SUMMARY
The renewal of the agreement for FY2003/04 was Board approved last year.
The amount for the renewal was derived by Staff in 2001 using anticipated
capital projects for FY2003/04 and considered average survey hours of past
years.
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
This item does not impact the overall budget because it is not paid separately as
a lump sum item. Surveying funds have been included in the individual project
budgets that require these services. They are expensed as the services are
used on the projects.
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1 . Scope of Work
2. Fee Schedule for 2003/04 with Escalation Rates
3. PSA Status Report — MDS
4. PSA Status Report — Bush & Assoc.
TH:Ic:ba:lc
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 13(f).MDS Consulting.doc
Revised: 8120,98 Page 2
d
ATTACHMENT A
SCOPE OF WORK
SURVEYING SERVICES FOR COLLECTIONS SYSTEM
AND TREATMENT PLANT PROJECTS
TYPICAL TASKS
PRELIMINARY ALIGNMENT: Provide preliminary stationing at intervals as
required by District Engineer.
CONSTRUCTION ALIGNMENT: Provide horizontal and vertical controls. Paint
centerline of sewer for collections projects
when requested by District Engineer.
CONTRACTOR'S STAKING: Provide one set of offset line-and-grade stakes
for pipeline, manholes, structures, etc. at 25 to
50-foot intervals, or as required by District
Engineer along with cut sheets for contractor's
use.
PIPE CASINGS/TUNNELS: Provide one set of offset stakes for each pit
location and one set for horizontal and vertical
control in pits, with cut sheets.
Provide line-and-grade checks inside casings.
PIPELINE HEADING CHECK: Provide line-and-grade checks daily or as
required by the District Engineer.
STREET CENTERLINE TIES: Prior to construction, tie-out street centerline
monumentation, and after construction, replace
disturbed or destroyed street centerline ties.
PAVEMENT REPLACEMENT: At the locations requested by the District, street
cross sections will be surveyed prior to
construction. For pavement replacement after
construction, one set of paving and curb stakes
will be provided at locations designated by the
District.
1
i
1
MISCELLANEOUS SURVEY: As requested by the District, provide boundary
and topographic surveys, monument
replacement, aerial control, settlement
monitoring, and other miscellaneous items.
Prepare base maps and exhibits using
AutoCAD, latest version.
REQUIREMENTS
1. Survey crew should be available within a 24 hour notice.
2. Survey crew should be experienced with tunnel and casing surveys.
3. Three copies of all survey notes shall be furnished to the District within 24 hours of
survey or stakeout.
4. Surveyor's field personnel should be able to recognize survey errors or omissions on
the contract drawings, survey or stakeout.
5. Survey party should consist of two or three persons per crew with a certified party
chief.
6. Party chief or company representative should be available for the pre-construction
meeting and other key meetings as the project progresses.
7. All supplies, such as, but not limited to, stakes, flagging, nails, spikes, ties, paint, etc.
shall be included in the hourly rate for the survey party.
8. All surveyors must be adequately insured for liability and property damage, and a
copy of the policy must be forwarded to OCSD.
9. Survey crew shall be able to provide proper traffic control in accordance with the
W.A.T.C.H. Manual or as required by the governing agency when carrying out their
functions and duties.
10.At least one member of the party should have a cell phone/pager or other form of
communication so as to be in contact with the home office in the event the District
requires immediate communication with the party during normal working hours.
11.Survey crew should be available for occasional night work (4:30 p.m. to 7:00 a.m.)
upon 24-hour advance notice.
12.Survey work shall be documented in English Standard Units and/or Metric Units, as
required by the District.
2
a
ti.
13.Invoice shall be coded with District assigned project name and number for each
work item.
G:\wp.dta\engWOBS&CONTRACTS\Soils,Survey,E-Testing Contracts FY 01-04\Survey\SU RVEY SOW 2001 to 2004.doc
3
° ATTACHMENT B
SURVEY SERVICES: BUSH&ASSOCIATES FEES
7/1101 -6/30/02 7/1/02-6/30/03 7/1/03-6/30/04
Lic. Surveyor $74.00 $75.11 $76.24
2-Party Crew $136.00 $138.04 $140.11
3-Party Crew $176.00 $178.64 $181.32
Office Calcs $58.00 $58.87 $59.75
CAD Draftsperson $52.00 $52.78 $53.57
0.5 0.6 0.5
Min. hrs per Callout
Travel Charge $0.00 $0.00 $0.00
1.5%
Max.Esc. Rate 02t03
Max.Esc. Rate 03/04
Other
Other
Other
None:Escalation rates of 1.5%were used to calculate rates for FY 02103,03104,as specified by Bush
Professional Services Agreement Status Report
Surveying Services PSA-2001-34BD
Total Project Budget: $120,000 FY 01/02, $170,000 FY-02/03, $95,000 FY-03/04 $75,000
Consultant: MDS Consulting
Start Date of Project: July 1, 2001
Date Addendum Description Cost Accumulated
Costs
07/01/01 Original Surveying Services for capital projects (FY 01/02)
PSA $120,000 N/A
07/01/02 1 Surveying Services for capital projects FY 02/03 $170,000 N/A
07/01/03 2 Surveying Services for capital projects FY 03/04 $95,000 N/A
Pending 3 Surveying Services for capital projects FY 03/04 $75,000 N/A
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 13(f).2.doc 02/19/04
Revised 05/14/98
Professional Services Agreement Status Report
Surveying Services PSA-2001-34BD
Total Project Budget: $120,000 FY 01/02, $170,000 FY-02/03, $95,000 FY-03/04
Consultant: Bush & Associates
Start Date of Project: July 1, 2001
Date Addendum Description Cost Accumulated
Costs
07/01/01 Original
Surveying Services for capital projects (FY 01/02)
$120,000 N/A
07/01/02 1 Surveying Services for capital projects FY 02/03 $170,000 N/A
07/01/03 2 Surveying Services for capital projects FY 03/04 $95,000 N/A
Pending 3 Surveying Services for capital projects FY 03/04 $75,000 N/A
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 13(f).3.doc 02/19/04
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-06 13
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Larry Rein, Project Manager
SUBJECT: BUSHARD TRUNK SEWER REHABILITATION, JOB NO. 1-2-4
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 4 to Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4, with
Steve P. Rados, Inc., authorizing an addition of S380,251 , increasing the total contract
amount to S30,685,478.
SUMMARY
Background
• Job No. 1-2-4, Bushard Trunk Sewer Rehabilitation, includes the installation of
21,600 linear feet (just over four miles) of 108-inch reinforced concrete pipe,
manholes, junction structures and miscellaneous utility relocations.
• Boyle Engineering Corporation prepared the plans and specifications, and the
contract was awarded to Steve P. Rados, Inc., on June 26, 2002.
• Change Order No. 4 includes seven items of additional work to Job 1-2-4. There are
no errors and one omission associated with this change order. There is no time
extension associated with this change order. Liquidated damages on this contract
are $2.000 per calendar day and the bonus provisions are S750 per calendar day.
Contract Schedule
Contract Start Date September 16, 2002
Original Contract Completion Date March 18, 2004
Total Number of Change Orders to Date 4
Current Contract Completion Date March 21 , 2004
Actual Completion Date N/A
Days Subject to Liquidated Damages N/A
Page 1
r.
Change Order No. 1 Content
Item No. Description Amount Days Type
1 15" City Sewer Siphon S 30,000 0 Changed
Condition
2 Additional Traffic Signal Poles $ 16,353 0 Design Change
3 Damaged 18" VCP $ 7,596 0 Changed
Condition
4 Plant 2 Main Entrance Sliding $ 107,307 0 Design Change
Gate
5 Miscellaneous Traffic Devices $ 66,491 0 Design Change
6 Concrete Encasement City $ 18,179 0 Omission
Sewers
7 Temporary Fire Station $ 134,325 0 Design Change
Total — Change Order No. 4 $ 380,251 0
Items 1, 2, 3, and 5 involve potential time extensions to the contract. The impact to the
project could not be determined at this time. If necessary, justified contract time
extensions for these items will be included in a future change order.
Items 2 and 5 are traffic control improvements required by the City of Huntington Beach.
Item 7 is for improved emergency vehicle access required by the City of Huntington
Beach. Item 4 is to add the installation of the Plant No. 2 main entrance gate equipment
and coordination of utilities for the equipment provided. The final details for the gate
equipment were not determined until after the contract was bid.
Job Completion
The contract is now 30% complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded by the Board of Directors on June 26, 2002. Please refer to
the attached Change Order Status Report for information on all previous change orders.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 30,003,210
Previously Authorized Changes $ 302,017
This Change Order (CO No. 4. Add) $ 380,251
Change Orders to Date $ 682,268
Percent Increase to Date 2.27%
Amended Contract Price $ 30.685,478
Page 2
BUDGET IMPACT
® This item has been budgeted. (Line item: FY 03/04, Section 8, Page 43, Capital
Improvement Program, Collections Facilities, Bushard Trunk Sewer
Rehabilitation, Job 1-2-4)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
None
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program EIR certified on
October 27, 1999. A Notice of Determination was filed on October 29, 1999.
Additional CEQA documentation for the project was included in Addendum No. 3
to the EIR approved on December 19, 2001. This Addendum will not change CEQA
findings.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
4. Location and Photo Description of Change Order
MB:dm
HAntglobaKAgenda Draft ReportsTMI-2-4 AR CO#4 020504.doc
Page 3
BUDGET INFORMATION TABLE
BUSHARD TRUNK SEWER REHABILITATION
JOB NO.1-2-4,CO r4
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED
PRO.IECTrPMASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE
BUDGET BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE
/DECREASE
Phu.1-Pro en Development S 7.800 S 74,000 $ 74.000 S 74 000 S 74,000 $ 73.669
Ph-o2-Proiimi- Desi n S 15002 $ 9.200 $ 9200 S 9.200 S $ 9,200 S 9.147
Plisse 3-Des D*sqn S 1.051 724 $ 2.690.400 $ 2690.400 S 2 690 400 $ 2.690.400 S 2496.653
Phase 4-ComtnxAmn $ 24.100 051 S 33 841.417 $ 380.251 S 340221.668 S 33 841 417 S 380,251 S 34.221.668 $ 10284.632
Phls.5-Commtsslom S 50.000 $ 50.000 S - $
Phase 6•Close-out S 30.000 S 30.000 $ S
Phase 7-Conbngency $ 7348 924 S 2 697.983 S IM02511 S 2.317.732 S
PROJECT TOTAL S 32.803.501 $ 39.393,00D $ - $ 39393.000 IS 36.615.017 $ 390.2Si $ 36.995.268 S 1286Q 101
Reimbursablo C.SL'.
PROJECT NET I$ 32.803.507 1$ 39393.000 1$ - S "393000 S 36.615,017 S 390.251 1 S 36.995.288 1$ 12.864.101
PSA/Conlracl
Deg n PSA $ 269.900 1$ 2.019.411 S $ 2019411 11 S 2.019,411 S - S 2.019 411 1 S 1.319.756
Construnan Corllract S 21.011.000 1 S 30.305.227 S 390.251 1$ 30.685 478 S 30.305227 1 S 380.251 1 S 30.685 478 1 S 8.917.740
L
CHANGE ORDER STATUS REPORT
BUSHARD TRUNK SEWER REHABILITATION
JOB NO.1-2-4-CO#4
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM TIME TO DATE
DATE COST TO DATE INCREASE
(DAYS) (DAYS)
CONTRACT Sept.16.02 $30,003,210 $30,003,210 550 550
CO NO.1' April 23,03 $150,000 $30,153,210 0.50% 0 550
CO NO.2 June 25.03 $107.724 $30,260,934 0.86% 2 552
CO NO.3 October 22,03 $44,293 $30,305,227 1.01% 1 553
`'CO Nt).'�1- ;F 25-2004 "'$380 { .$30 G85 478 2 27°G 0 >553>
'Approved by PDC Committee per delegated authority by Board Resolution 99-23
1
Page 1 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Four 4
Date: February 25, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
Amount of this Change Order(Add)(ist) $380,251.00
In accordance with contract provisions,the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 — 15" CITY SEWER SIPHON
This item is for additional labor, material and equipment required to install a revised 15-inch City sewer
siphon at the Adams/Bushard intersection at Sewer Station 147+40.The proposed siphon interfered
with a proposed 60-inch storm drain. The Contractor was directed to route the 15-inch sewer under the
storm drain. This re-routing increased the length and depth of the sewer. The extra work consisted of
additional asphalt removal and replacement, additional dewatering, trench excavation with shoring and
backfill, removal and replacement of an existing City manhole, and installation of additional 21 feet of
15-inch clay pipe with concrete encasement at the crossing point with the proposed 60-inch storm
drain. The Contractor has reserved its right to submit a time impact analysis for this item at a later time
to extend the completion date of the contract. Staff and Contractor mutually agreed to analyze all time
impacts sequentially after the project's re-sequencing time impact analysis has been approved. This
item was negotiated with the Contractor pursuant to Section 46 of the General Requirements.
(Reference FCO 124-1)
ADDED COST THIS CHANGE ORDER ITEM: $ 30,000.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2—ADDITIONAL TRAFFIC SIGNAL POLES
This item is for labor, material, and equipment required to provide two temporary traffic signal poles
with signal and pedestrian heads at the Atlanta/Bushard intersection between sewer stations 93+50
and 95+20. The City of Huntington Beach required the installation of these signal poles to enhance
traffic safety in the intersection. The temporary poles are not required in the contract. The work
consisted of furnishing and placement of the signal poles, overhead mounting of wiring and signal
programming. The Contractor has reserved its right to submit a time impact analysis for this item at a
later time to extend the completion date of the contract. Staff and Contractor mutually agreed to
analyze all time impacts sequentially after the project's re-sequencing time impact analysis has been
approved. This item was negotiated with the Contractor pursuant to Section 46 of the General
Requirements. (Reference FCO 124-19)
ADDED COST THIS CHANGE ORDER ITEM: $ 16,353.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
i
i
Page 2 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Four 4
Date: February 25, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
ITEM 3— DAMAGED 18" VCP
This item is for labor, material, and equipment required to replace an existing 18" sewer at
approximate sewer station 81+13. When the Contractor exposed this sewer to make a contract
required tie-in, the sewer pipe was found cracked. The Contractor had to replace a section of this pipe
to properly connect the new sewer. The extra work consisted of excavating, shoring, dewatering,
sewer removal and replacement, backfill, and paving. The Contractor has reserved its right to submit a
time impact analysis for this item at a later time to extend the completion date of the contract. Staff
and Contractor mutually agreed to analyze all time impacts sequentially after the project's re-
sequencing time impact analysis has been approved.This item was negotiated with the Contractor
pursuant to Section 46 of the General Requirements. (Reference FCO 124-21)
ADDED COST THIS CHANGE ORDER ITEM: $ 7,596.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4— PLANT 2 MAIN ENTRANCE SLIDING GATE
This item is for labor, material, and equipment required for the procurement and installation of new
sliding gates at the Plant 2 Main Entrance, and to perform all preparatory site work associated with the
gate installation The contract does not contain a requirement for gate installation because the work
was to be done under a separate contract because of coordination issues, which include the work and
is now being included in this contract. The final gate design for this work was completed after
construction bid and contained additional walls and equipment support foundations which were not
part of the contract. The work consisted of existing wall and concrete removal, excavation, soil work,
wall and foundation construction, and gate equipment installation. This item was negotiated with the
Contractor pursuant to Section 46 of the General Requirements. (Reference FCO 124-22)
ADDED COST THIS CHANGE ORDER ITEM: $ 107,307.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
a
Page 3 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Four 4
Date: February 25, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
ITEM 5— MISCELLANEOUS TRAFFIC DEVICES
This item is for labor, material, and equipment required for revisions to the contract traffic control plans
between May 21, 03 and August 3, 2003 as required by the City of Huntington Beach. The contract
documents contain designed traffic control drawings for all phases of main line sewer installation along
the four-mile sewer alignment. When the traffic control was first implemented the City of Huntington
Beach found that modifications were necessary to direct traffic around the construction sites. The
contract-included traffic control drawings had been reviewed by the City of Huntington Beach prior to
construction, but were revised by the City when the contractor started to set up the traffic control. The
modifications range from additional traffic signs and crash cushions to the installation of temporary
traffic lights with associated electrical conduits and wiring. The traffic control modifications will continue
throughout the construction phase. This item pays for the extra cost incurred by the Contractor. The
Contractor has reserved its right to submit a time impact analysis for this item at a later time to extend
the completion date of the contract. Staff and Contractor mutually agreed to analyze all time impacts
sequentially after the project's re-sequencing time impact analysis has been approved.This item was
negotiated with the Contractor pursuant to Section 46 of the General Requirements. (Reference FCO
124-24)
ADDED COST THIS CHANGE ORDER ITEM: $66,491.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 6—CONCRETE ENCASEMENT CITY SEWERS
This item is for labor, material, and equipment required to provide reinforced concrete sanitary sewer
encasements with modified lengths,where not specified on the contract drawings. On the contract
drawings numerous sewer siphons did not show requirements for steel reinforcement in the concrete
encasements. Reinforcement was determined to be necessary and added to all encasements. In
addition, some encasement lengths had to be increased to properly protect the sewers. The work
consisted of additional excavation and reinforcement installation. This item was negotiated with the
Contractor pursuant to Section 46 of the General Requirements. (Reference FCO 124-28)
ADDED COST THIS CHANGE ORDER ITEM: $ 18,179.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
e
Page 4of6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Four 4
Date: FebruarL25, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
ITEM 7—TEMPORARY FIRE STATION
This item is for labor, material, and equipment required for the installation of a temporary fire station on
Yorktown Avenue within the Huntington Beach Union High School District property. The City of
Huntington Beach Fire Department requires the use of a temporary fire station during the construction
of the project whenever the construction area is on Bushard, at or between the Adams and Yorktown
intersections. When the work is in these locations, the Fire Department does not expect to be able to
maneuver through the contract-provided emergency lanes within the construction zones and traffic
detours fast enough to provide adequate emergency service from the existing fire station. The work
included furnishing and installation of a 840 sq. ft. trailer, fire engine canopy, perimeter fence, utility
hook-up, and site access work. This item was negotiated with the Contractor pursuant to Section 46 of
the General Requirements. (Reference FCO 124-35)
ADDED COST THIS CHANGE ORDER ITEM: $ 134,325.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Day
TOTAL ADDED COSTS THIS CHANGE ORDER: $ 380,251.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Day
a
Page 5 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Four 4
Date: February 25, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
The additional work contained within this Change Order can be performed incidental to the prime work and
within the time allotted for the original Contract and any extensions to the Contract time made by this and
all previously issued Change Orders. It is therefore mutually agreed that no time extension is required for
this Change Order, and no direct or indirect, incidental or consequential costs, expenses, losses or
damages have been or will be incurred by Contractor, except as expressly granted and approved by this
Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: September 16, 2002
Original Contract Time: 550 Calendar Days
Original Completion Date: March 18, 2004
Time Extension this C.O.: 0 Calendar Day
Total Contract Time Extension: 3 Calendar Days
Revised Contract Time: 553 Calendar Days
Revised Final Completion Due Date: March 21, 2004
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: N/A
Original Contract Price $ 30,003,210.00
Prev. Authorized Changes $ 302,017.00
This Change (Add) (Deduct) $ 380,251.00
Amended Contract Price $ 30,685,478.00
0
Page 6 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Steve P. Rados, Inc. C.O. No.: Four 4
Date: February 25, 2004
Job: Bushard Trunk Sewer Rehabilitation, Job No. 1-2-4
Consultant: Boyle Engineering Corporation
Board Authorization Date: February 25,2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
John D. Linder, P.E. Date
Engineering and Construction Manager
Approved by:
David A. Ludwin, P.E. Date
Director of Engineering
Accepted by:
Steve P. Rados, Inc.
Contractor Date
EDMS 003760420
(p O
m 0-
o c Z
C v O
o 0 _
0 1
rn N N
p CD N p
N p
Z
O
_�f Cr' r•LT�::s '.11�+� >r . :5, t J yi fe' y r � t'.f 'fib. .. .� o� •:.� l�jr� "ti f, �YJ^Z'.'..,*�•� �• 4 i y! ^t�JJ}��t-4� S/6y +`�jt �'S'+�.1��� •� �� ~ h � itY'i r•t'� , f�r..'.f�".t• �{�rt� a c -�N, � � (Ky� •ri•��I��l IL.� ��i� "N
,.:T?�:.i ,�.' t ,• ti} ++X 1�,*+�, t11+ y :r (, 4..t)t Q5S�E.Iz .it,vi
V//n� l- I ��� i�a•. �i' �r p / $� .{. 1 • r +t'V1. f •>l, Y :tii+, j
/ `fir i` '..t .p 7 ��. l ��. �� �1.71g1'G`r' S= r �� 1' � •�' 'i� � r•.�� � �'R�.:
t Mu
Q �. �� 4. 3'3 gY^it tX ,Ii' ,.ti{�t gJ �: j. ;�• 1
tom")b ��►' f .r
f? 'i cy Ei�y r.w1 l'r r� r
Z r
i•.• J �Y•rl ;• '
' y x •j ri
Sk *_ 2f e: r t 1. �t `' �r f �f t l 9 1a•s'
)Jl'.
_ may� .{Q'�r,,• '�� _ (� _ (�*j�
�1L I�il a �t I Yl•.p. S���3 Z, i t�� � •' l��iTJ4 -. _t _�_ - .'� �i� .. - •�; I�t'1._r:;�t
L
(D O
Z 0-
m z
cn
? � O
U) -, (D
o OCY) i
� N CL
� N
A C:) (D
A
Z
O^^
S�1.tN,q�i'.�(� It" 44��t� w r '► � .�j ��"j' ��j�j �'��� r .��� C�j' N
_ ! , `.I''..����,,ifj}S��^�'j '1. _ �r�'.r L,�Lr1 - I .1. �} t� �1 .0 �r. ter• � � ? i� �(ry�� -
%- Ozo
�t
v t ` JJ^.i + {•+Ve l' �� ._+..11.�- rJ f. ] k.,pil,it kT��7��!1 r�. l�. 1oC. _., y,.. .
Mt.'i/—..r, t 1.✓�, � -•iu �ru,,.,uw.tr� � ��ir+ .[q�, ""�
+�Nr�-,
�' —,�♦ .7.ri ��� S� v("���..��+ �_.� � r ..1 � rii�l r• � 1� r � i
J t �� � p�_a ��'� .. r .. �4 g slY-1'. �1' r � .��y it{ 'f •`r�� � A � •�.r,��,.�1:��- ��
� � vyt. - :�• '� 'Ji ..ti.. � �. �.it.�, •�'- ^�;:„ .f '1"j I � 1 _ ,,, ti �1:�:,�. N .f;��... �.
BY
{Y
,- ��r� `'. `� -� � ; i� '�CtlISl� ii� ., t ,7y<<����Cj�..►{r s *�,y � � i��� rLr� 4�i� �i#y� ,�l
77
•.., v ,. -/��1.1 li 1.,i11,—�''- � .1`�.�fi,�i{1 j.}'1J., � l..[f5' �j}� �• �.+ 3 t lam, ,�+on
_ , �..:`w.-. � ..�.i( .'J ...... ` , Y.V-1 My.-;. �.1LV�O'A1C•++(�'•cdilwf
_ f
.r
�� ,� is `r'= �� ,. ... �f��r> i. ,,��`• 1 !•~��' /
YYY - :` ti � '. 1. -Q , j��s,c�•
t' '* .'.'''mot x;` � � Jam' ,•;,
'• •ram.: . ��a;,,}�,
r
Vil
a w���' -� .�°', / � `' �,i`j. .�•r � :fit `..� ' � , ••
ti�,S�s �s- �1 �. ,Z• _ •�'7' � 'Y. ! � o( 1 _•; + _ 1 �f' �`!�.'t
1lAv f r�� ��ai� y4�_�i� (.trg _ ,tS. 9 � �.. .. - •/i � r t r ,y�3?�y:rssE _%
ip RpIM� `j;r � �+,1!d''Jt;• ''�t�} �,Y �1► ;t� 41 { s ! t
(I! r1:�{j'''� ) T' '�' �� si r • !l f` e� ! _ '�`•l•
r jy•r t ,' •� tl- 1�•7� L t!= J�� r}v.. `CJ'7 �i),�� •1 y� 1i y�..{,• _
,Q wR�t ,� ► 6 �jt .? f ��cCy. T'' �;,i ,.•► i�K'•,1/;4 s. -r � t• �,� sue:
�.�/)1r�XZI,•�7•�;. �s ri.'},�f' . t�R.
• , .` [S1 i•: �� �l 7 �'•�� f i►RF "NF t-t•• n, �'
I've
cn
C3O !1 `\• _ I` �•+� i•,g .•U�. Q� �•j u �' •1".i,� .•lrJt ar .t{'`S'_ �� L
42
IN
,'�•�, Y>- :";� .�„*f' :,>—.cz5, •'•-� 'y� i� ` ,'-t_ a-•• - .ors' -. O
Al
IN
Nj
` 7 ''• =t�`rai"� fie.- r�f�'I-jf' -ei:.i - �� 6'd�l I ��j t� l ,lr��
O ..•"�•!�_ ',1:1 If .D, � � /�1��',�}.\�"�'•"•Y�,y•'it <� �� �1•r1 I �j' /�i`1••\ .�. ''•�` u
' `� � � •^ -f ��1b�+ /�-_ / [ �'tl r✓(r •�I rf /7/4.1�\\ r � �~�t'','~ -�i nt' �' f 3
L � �:-�� v Yf i1 , I. � 1•J , - � I 4� �1, [? .4.� .[�'�� i'1 jf� I��t
✓ ..s�44•.� �t� .[� •1 35�4 :rl � ) .) ``�.ili 'V\�' .\ �Y•
O •.4,�,�, � - V-. .-ice `Y.IRa•�il ••
1 . .J� �d� ' / b� •'I `� ri ��2f1 �`Y"� ' I.I. ' 3' n 11•�1 � ,L 1 r.
� � ,e� / /�' ii�I �y � {pp� • j
'a / �y/� ! � t:�e• w;t �-�••� I /rt-�f- �=-y. -f`r...:s` rA�a y" ji'
, .a1,' �. .. f! r � ( •�.t �7D4' _ rlyt 1' lV � ��'" r•� �I t ��^�1- �./r �
i' tr�'•C—{�'.. ,R -`a' �' _ � � 1 , "��•,r� t7 � I1 1 _ �) � '•YM,,�,lit i (Jf. � � r� �.r
, N4 1. 1+ .. 1 �� t l 11•"�I t lY{�..'��.�. •
�'•
_Y/ )_ '. .ice. 1 i I '11 7+J++'^ ! l.V>1!'• .
, •Lr 7.,;r.11'�7,� •�t't.l i! 2, �'iri L' -�
Job No. 1-2-4 CHANGE ORDER NO. 4 February, 2004
F t+ "
Concrete Encasement
w.
Concrete Encasement
.J: "f" -•f\�.G,{a:rl� 7isf�3-n.R4�v�` - t,J^!• �L-�fy
Item 6 — Concrete Encasement City Sewer
E _
1_ r
�•' ' .t". �\K, `ri Y`LL. ALI
Al.- t51
`.... �t
Temp. Fire Station Temp. Fire Station
Item 7 — Temporary Fire Station
EDMS 003760427 �
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-C 13 h
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Umesh Murthy, Engineer
SUBJECT: EFFLUENT PUMP STATION ANNEX
JOB NO. J-77
GENERAL MANAGER'S RECOMMENDATION
Ratify Change Order No. 1 to Effluent Pump Station Annex. Job No. J-77, with J.F.
Shea Construction, Inc., authorizing a deduction of $1 ,967,158, decreasing the total
contract amount to $42,768,360.
SUMMARY
Background
The Effluent Pump Station Annex (EPSA), Job No. J-77, will replace the existing Foster
Booster Pump Station with a new pumping facility that is capable of providing adequate
backup capacity to the existing Ocean Outfall Booster Station (OOBS) during excess
flow events and routine maintenance. The EPSA will also accommodate the pumping
of secondary treated water exclusively through the 78-inch outfall during excess flow
events.
ESPA will house three 120 million gallons per day (mgd) pumps. Two of these pumps
will provide backup capacity of 240 mgd, which is one-half of the nominal capacity of the
existing OOBS facility. The third 120 mgd pump will serve as a standby for these two
units.
Black & Veatch prepared the plans and specifications and the contract was awarded to
J.F. Shea Construction, Inc., on September 24, 2003.
Change Order No. 1 includes three items of revised work for credits to Job No. J-77.
There are no omissions and no errors associated with this Change Order. Liquidated
damages on this contract are S2.500 per day and there are no bonus provisions.
Revised: WNW Page 1
Contract Schedule
Contract Start Date November 24, 2003
Original Contract Completion Date June 30, 2007
Total Number of Change Orders to Date 1
Current Completion Date June 30, 2007
Actual Completion Date N/A
Days subject to Liquidated Damages 0
Change Order No. 1 Content
Item Description Days Type
No. Amount
1 Design Revisions to ($1,496,400) 0 Design Change
Reinforced Concrete Pressure
Pipe (RCPP), Reinforced
Concrete Cylinder Pipe
RCCP and Steel Pipe
2 Design Revisions to Vertical ($177,000) 0 Design Change
Shaft Centrifugal Pumps
3 Diesel Engine Generators $293,758 0 _ Design Change
Total — Change Order No. 1 $1,967,158)
Job Completion
• The project is now 2 % complete.
PRIOR COMMITTEE/BOARD ACTIONS
The contract was awarded to J.F. Shea Construction, Inc., by the Board of Directors on
September 24, 2003.
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $ 44,735,518.00
Previously Authorized Changes $ 0.00
This Change (Deduct) $ (1,967,158.00)
Change Orders to Date 0.00
Percentage Increase to Date (4.40%)
Amended Contract Price $ 42,768,360.00
Revised: 06/04/03 Page 2
v
BUDGETIMPACT
® This item has been budgeted. (Line item: section 8, Page 73)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The construction contract for an amount not to exceed $44,735,518 was awarded to
J.F. Shea Construction, Inc., by the Board of Directors on September 24, 2003. The
low bidder, J.F. Shea Construction, Inc., was approximately 20% higher than the
engineer's estimate. At the September 4, 2003, PDC meeting, District staff explained
that the main difference between the engineer's estimate and the bid was a result in an
incorrect interpretation of the pipe size by the manufacturer. Staff stated that they
would negotiate a change order to address the reduced size.
Item No. 1 of this change order includes credits to the above mentioned concrete pipes
and fittings of varying sizes (60 inches to 120 inches diameter) for changes in design
criteria. Design criteria that were evaluated include the pipe thickness, pipe testing
requirements and joint modifications. The design changes resulted in substantial
savings without compromising on the quality of the pipe and pipe fittings.
Item 2 of this change order was negotiated with the Contractor by making minor
revisions to the pumps' lubrication system design and factory testing procedures.
These revisions will not compromise the quality and performance of the pump and its
accessories.
Item 3 of this change order was negotiated with the Contractor without any changes to
the performance specifications.
During the course of these negotiations with the contractor, District staff worked with the
Design Consultant, Black and Veatch Corporation, who concur with all of the above
mentioned credits.
ALTERNATIVES
None
CEQA FINDINGS
The rehabilitation of Foster Pump Station (FPS) was included in the 1999 Strategic Plan
Environmental Impact Report (EIR). The EIR was certified on October 27, 1999, and a
Notice of Determination was filed on October 29, 1999. A Supplemental EIR (SEIR)
Revised: 06/04/03 Page 3
0
D
was completed for update of the Program EIR to reflect replacement of FPS rather than
the rehabilitation indicated in the Strategic Plan. The SEIR was approved by the Board
in December of 2002.
ATTACHMENTS
1. Budget Information Table
2. Change Order Status Report
3. Change Order
TB:dm
HAntglobaKAgenda Draft Reports\PDCW-77 AR C01 022504.doc
Revised: 06/04/03 Page 4
1,
BUDGET INFORMATION TABLE
Effluent Pump Station Annex
JOB NO.J-77
ORIG114AL CURRE14T PROPOSED PROPOSED FUNDS THIS ESTIMATED
PROJEC7lPHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION A710N EXPENDITURE
BUDGET INCREASE BUDGET DATE REOUEST AUTHORIZATION
TO 70 DATE
/DECREASE
Phase 1-Project
Development 21.000 21.000 S 21,000 S 2.100 S 2.100 S 2.100
Phase 2-Preliminary
Desi n S 1.258.000 60,045 S 60,045 $ 60.045 $ - S 60.045 $ 60.045
Phase 3-Design 3.501.000 S 4.38i 823 S 4.387.823 S 4,387,823 $ 4.387 823 S 4.387.823
Phase 4-Construction 43,745,000 51,791,650 1 967 158 S 49.824 492 S 49.916.066 1 967 158 S 47.948 908 $ 110.984
Phase 5-Commissioning 376.000 376,000 S 376,000 S 376.000 $ 376.000 S
Phase 6-Close-Out 94,000 94,000 94 000 $ 94,000 S 94.000 S
Phase 7-Contin encv S 1 q762hOOO 1.762 000 1,967.158 3 729.158 S - $
PROJECT TOTAL $ 50.757,000 $ 58.492.518 S - S 58.492.518 $ 54.836.034 1$ (1.967,158) S 52.868.876 1 S 4,560.952
Reimbursable Costs
CHANGE ORDER STATUS REPORT
EFFLUENT PUMP STATION ANNEX
JOB NO.J-77
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM DATE COST TO DATE INCREASE/DECREASE TIME TO DATE
(DAYS) (DAYS)
CONTRACT 11/2412003 $44.735,518 $44.735,518 0.00 1315 1315
CQ NO t i:, Pensifng. (51987,i58j 442,76%360 (4AO),. A :4 15� �
Page 1 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: One 1
Date: February 25, 2004
Job: Effluent Pump Station Annex
Job J-77
Consultant: Black &Veatch
Amount of this Change Order(Add# (Deduct) ($1,967,158.00)
In accordance with contract provisions,the following changes in the contract and/or contract
work are hereby authorized and as compensation,the following additions to or deductions
from the contract price are hereby approved.
ITEM 1 — DESIGN REVISIONS TO RCPP, RCCP AND STEEL PIPE
This item is for savings in labor, materials and equipment for revisions made in the design criteria for
large diameter Reinforced Concrete Pressure Pipe (RCPP), Reinforced Concrete Cylinder Pipe
(RCCP) and Steel Pipe at the new Effluent Pump Station Annex located at Plant No. 2. The major
revisions included reduction of pipe wall thickness for the RCPP and RCCP, elimination of the factory
hydrostatic testing and allowing spiral welding of the Steel Pipe.The largest part of the cost savings in
this item was associated with the reduction of the specified RCPP and RCCP pipe wall thicknesses.
These revisions were requested by staff to provide the best value in these pipes with the least impact
on the over-all performance and delivery times for the products or on the project schedule. District
staff and the design consultant determined that these changes in certain design criteria would result in
substantial savings with no impact on the quality of the products.This item was negotiated with the
Contractor in accordance with Division 01, section 43.13.1 of the General Requirements. Reference
District's Field Change Order No. 1 and J.F. Shea's letter dated December 18, 2003.
ITEM DESCRIPTION OF REVISION COST SAVINGS
RCPP Revise D-Loads (Indirect Design Method) ($498,000)
RCPP Delete Hydrostatic Test inplant) $83,000
RCCP Revise Specials Min. Wall Thickness $6,400
RCPP Revise Pipe Fittings Test Requirements $43,000
RCPP Revise D-Loads Indirect Design Method $711,000
RCCP Revise Specials Min. Wall Thickness $23,000
RCCP I Revise Fittings Testing $77,000
Steel Pie Allow Spiral-Seam Welded Pie $55,000
Total $1,496,400
CREDIT THIS CHANGE ORDER ITEM: ($1,496,400.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 2 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: One 1
Date: February 25, 2004
Job: Effluent Pump Station Annex
Job J-77
Consultant: Black & Veatch
ITEM 2 - DESIGN REVISIONS TO VERTICAL SHAFT CENTRIFUGAL PUMPS
This item is for savings in labor, materials and equipment for revisions made to the Vertical Shaft
Centrifugal Effluent Pumps and motors and factory witness test criteria for these pumps and motors to
be installed in the new Effluent Pump Station Annex. District staff and the design consultant
determined that by making minor revisions in the type of oil lubrication systems utilized on the pumps
and by shipping only one motor and variable frequency drive assembly to the pump manufacturer's
factory in Japan for factory tests, substantial savings to the District could be realized. Project
specifications required all three motors to be shipped to the pump manufacturer's location for tests.
These changes would provide the same type oil bath lubrication system currently used in the existing
similar pumps and motors currently in use at Plants 1 and 2, and would not compromise the quality of
the systems. This item was negotiated with the Contractor in accordance with Division 01, section
43.13.1 of the General Requirements. Reference District's Field Change Order No. 2, and J.F. Shea's
letter dated December 18, 2003.
CREDIT THIS CHANGE ORDER ITEM: ($177,000.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 3— DIESEL ENGINE GENERATORS
This item is for labor, material and equipment cost savings associated with the Diesel Engine
Generators to be furnished for the new Effluent Pump Station Annex project located at Plant 2.
Discussions with the contractor, after award of the contract for this project, revealed the possibility of
potential cost savings without any changes to the over-all performance specifications. Several
negotiation meetings with the contractor resulted in substantial cost savings on the generators. This
item was negotiated with the Contractor in accordance with Division 01, section 43.6.1 of the General
Requirements. Reference District's Field Change Order No. 3, and J.F. Shea letter dated December
18, 2003.
CREDIT THIS CHANGE ORDER ITEM: ($293,758.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL CREDIT THIS CHANGE ORDER: ($1,967,158.00)
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 3of4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: One 1
Date: February 25, 2004
Job: Effluent Pump Station Annex
Job J-77
Consultant: Black &Veatch
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
Change Order. It is therefore mutually agreed that no extension of time to perform the work is required
for this Change Order, and no direct or indirect, incidental or consequential costs, expenses, losses or
damages have been or will be incurred by Contractor, except as expressly granted and approved by
this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: November 24, 2003
Original Contract Time: 1315 Calendar Days
Original Completion Date: June 30, 2007
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 0 Calendar Days
Revised Contract Time: 1315 Calendar Days
Revised Final Completion Due Date: June 30, 2007
Time Subject to Liquidated Damages: N/A
Actual Final Completion Date: N/A
Original Contract Price $ 44,735,518.00
Prev. Authorized Changes $ 0.00
This Change (Add) (Deduct) $ (1,967,158.00)
Amended Contract Price $ 42,768,360.00
I�
f`
Page 4 of 4
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: J.F. Shea Construction, Inc. C.O. No.: One 1
Date: February 25, 2004
Job: Effluent Pump Station Annex
Job J-77
Consultant: Black & Veatch
Board Authorization Date: February 25, 2004
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
John D. Linder, P.E. Date
Construction Manager
Approved by:
David A. Ludwin P.E. Date
Director of Engineering
Accepted by:
J.F. Shea Construction, Inc.
Contractor Date
EDMS 003761411
PDC COMMITTEE Meeting Date To Bd.of Dir.
2/5/04 2/25/04
AGENDA REPORT Item Number Item Number
PDC04-08 13 i
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Hardat Khublall, Engineer
SUBJECT: GISLER-REDHILL TRUNK IMPROVEMENTS, REACH "A",
CONTRACT NO.7-36; ORANGE TRUNK IMPROVEMENTS, CONTRACT
NO.7-39; G ISLE R-REDHILL/NORTH TRUNK IMPROVEMENTS,
CONTRACT NO.7-41 AND CITY OF TUSTIN PROJECT NUMBERS 6106
AND 6151
GENERAL MANAGER'S RECOMMENDATION
Approve a reimbursement agreement with the City of Tustin to reimburse the Orange
County Sanitation District for the construction cost of two City water line projects located
in Prospect Avenue and Cameron Lane in connection with Gisler-Redhill Trunk
Improvements, Reach "A", Contract No. 7-36; Orange Trunk Improvements, Contract
No. 7-39; Gisler-Redhill/North Trunk Improvements, Contract No. 7-41 , and City of
Tustin Project Numbers 6106 and 6151 , for an amount of $665,211 , plus administrative
fees, in a form acceptable to General Counsel.
SUMMARY
• The Gisler-Redhill Trunk Improvements, Reach "A", Contract No. 7-36; Orange
Trunk Improvements, Contract No. 7-39; and Gisler-Redhill/North Trunk
Improvements, Contract No. 7-41 , are located within the Cities of Tustin and Orange
and unincorporated areas of the County of Orange. These separate sewer
improvement projects, managed as one construction contract for improved efficiency
and coordination consist of approximately seven miles of sewer pipelines.
• The District's construction contract, which included the three District's sewer line
contracts and the two city water line projects, was awarded to ARB, Inc., the low
bidder, for an amount not to exceed $18,375,999 at the District's January 28, 2004
Board of Directors Meeting. The anticipated start date for this construction contract
work is early March 2004.
• At the request of the City, the Orange County Sanitation District (District) has agreed
to bid, administer, and manage two City water line projects located in the same area
as the District's Gisler-Redhill/North Trunk Improvements. The total competitively
bid amount for the two city water line projects is $665,211 .
• This Reimbursement Agreement provides for the City to pay for the entire
construction cost for the City water line projects proposed to be installed by the
District's contractor. In addition, this agreement includes a reimbursable amount to
the District of S2,000 for modifying the District's plans and an overall estimated 5%
for administration and management costs.
Page 1
Revised: 06/04/03
• The City agrees to deposit the total bid amount of $665,211 with the District through
this agreement within forty-five days from the effective start date of the District's
construction contract. A final payment will be made at the end of the contract once
the District's accounting is complete.
• The City Council has previously approved this agreement.
PRIOR COMMITTEE/BOARD ACTIONS
The Board of Directors at its January 28, 2004 meeting, awarded a construction
contract to ARB. Inc. for an amount not to exceed $18,375,999 for Gisler-Redhill Trunk
Improvements, Reach "A", Contract No. 7-36: Orange Trunk Improvements, Contract
No. 7-39; Gisler-Redhill/North Trunk Improvements, Contract No. 7-41 and City of
Tustin Water Line Project Nos. 6106 and 6151 .
PROJECT/CONTRACT COST SUMMARY
The City's portion of the construction contract is $665,211 . Funds will be deposited with
the District per this agreement to pay these costs.
BUDGET IMPACT
❑ This item has been budgeted. (Line item:)
❑ This item has been budgeted, but there are insufficient funds.
® This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The District frequently cooperates with municipalities and has entered into similar
agreements in the past successfully.
ALTERNATIVES
None Suggested.
CEQA FINDINGS
This District's sewer line contracts were included in the District's Strategic Plan
Environmental Impact Report that was certified on October 27, 1999. A notice of
Determination was filed on October 29, 1999.
ATTACHMENTS
Budget Information Table
HK:jo:lc
H:,,ntglobaKAgenda Draft Reports\PDC\7-36 7-39 7-41 Agenda Report 010604.doc
Page 2
Revised: 06/04/03
BUDGET INFORMATION TABLE
GISLER-REDHILL TRUNK IMPROVEMENTS.REACH"A"
CONTRACT NO.7-36,
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS TTAS PROPOSED ESTIMATED
PROJECT:PHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE
BUDGET BUDGET INCREASE rT)ECREASE BUDGET DATE REOVEST AUTHORIZATION TO DATE
Phase 1-PrcjQ0 Devel s 30.000 S 3c G>3 S 30 0rx S 29 810
Phase 2-Prell-na D—nr $ 67.000 S 67.000 S 67.000 S 67.000 $ 6,767
Phase 3-Devi n E 369+000 S 417.000 S 417 000 $ 417.000 $ 417.000 $ 370.062
Phase 4-Construction S 6.386.000 S 5 6609298 S SOW298 $ 4,925.874 $ 4,925.874
Phase 5-Commissioning $ 90 437 s 90.437 90.437 $ 90.437
Phase 6•Cbsa0ul S 22.608 22.608 S 2.2.608 S 22.608
Phase 7-Conlin encv S 1 0324000 $ 7790356 £ 779.355
PROJECT TOTAL S 7 832000 S 7066698 S 7.066.6" 5,552 919 S 5.552.919 S 406.659
Reimbursable Costs
PROJECT NET S 7 s 7 066.698 S 7 066 633 5.352919 1 S 5 z2 t406.659
PSA/Conlracl
Deli n PSA S 223.176 S 255461
cwslnrctro Callrxt is 6.386.000 S 73442s 1 s I I 246 443 1 1 S 4_46 443 $ ��Ao
BUDGET INFORMATION TABLE
ORANGE TRUNK IMPROVEMENTS
CONTRACT NO.7-39
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED
PROJECT,'PHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZEDTO AUTHORIZATION TOTAL EXPENDITURE
BUDGET BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE
/DECREASE
Prase 1-Pro e:;Development S 37.000 $ 32.0D0 $ 32.0DO 32.000 S 32.000 $ 31.777
Phase 2-Preliminary Desl n is 70,000 $ 70.000 S 70.000 $ 70,000 S 3.441
phase 3-Devi n $ 326.000 S 320 999 S 320.936 320.999 $ 320,999 S 300.112
Phase 4-Construction S 4,718.000 $ 4,251.415 $ 4,251415 4.251.415 $ 4,251,415
Phase 5-Commimoning $ 61.735 S 61,735 61.736 S 61,736
Phase 6-Close-Out S 15-434 Is 15434 $ 15.434 S 15,434
Phase 7-Contingency $ 759,000 $ 546.346 $ 546.346
PROJECT TOTAL $ 5.840,000 S 5297.929 S - $ 5.97.92E 4.751,583 S - S 4,7514583 S 335.326
Reimbursable Costs
PROJECT NET S 5.B40,000 929 1$ S 5.297 9Ct• S 4 751.583 S $ 4.751.583 1 S 335.326
PSA/Contract
Des-n PSA $ 236,641 $ 236,641 11
Corlstructron Contract S 4,718,000 1$ 4113.733 s 4.113.733 11$ 4,113,733 1$ 4.113733 $ 0
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-09 13
Orange County Sanitation District
FROM: David Ludwin. Director of Engineering
Originator: Kathy Millea, Engineer
SUBJECT: REHABILITATION OF THE ACTIVATED SLUDGE PLANT
AT PLANT NO. 2, JOB NO. P2-74
GENERAL MANAGER'S RECOMMENDATION
(1) Approve Professional Services Agreement with MW H Americas, Inc. for engineering
services for Rehabilitation of the Activated Sludge Plant at Plant No. 2, Job No. P2-74,
for an amount not to exceed S2,139,998: and (2) Authorize General Manager to issue
Task Authorizations not to exceed $100,000.
SUMMARY
• The purpose of this project is to ensure that the Activated Sludge Plant at Plant
No. 2 can operate at its designed capacity with a high degree of reliability. The
original aeration basins and secondary clarifiers are over 20 years old and in need
of equipment replacement.
• Job No. P2-74 is one of six projects designated by the Capital Improvement
Program (CIP) as required in order to meet the District's goal of full secondary
treatment by 2012.
• The Professional Services Agreement (PSA) includes the following:
1 . Condition assessment and replacement of the major secondary treatment
piping systems and mechanical equipment that have begun to fail or are at
the end of their useful life. Preparation of a Technical Memorandum
evaluating the process of the high-purity oxygen (HPO) activated sludge
system to determine the most cost-effective method to improve sludge
settling characteristics in order to achieve better and more consistent effluent
quality.
2. Automation of the secondary treatment systems to the level of unattended
operation during normal operating conditions.
3. Detailed constructability and construction sequencing analysis.
4. Air Quality Management District (AQMD) permit support services.
5. Preparation of bidding and construction documents.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 13(j).MWH Americas.doc
Revised: 06/04/03 Page 1
• Once the construction contract cost is known, staff plans to request additional
funding for Construction Management support.
• Proposals were sent to seven engineering firms. Five proposals were received and
evaluated in accordance with District procedures. Staff recommends the approval of
the PSA to MWH Americas. Inc. for an amount not to exceed $2,139,998.
• Once approved by the Board, the PSA includes a provision for the General Manager
to approve task orders totaling $100,000 in order to expedite the continuation of the
work during the design phase. This is approximately 5 of the design PSA amount
and it allows the General Manager to expeditiously continue with the design process
when small changes arise. Each task order will have to be approved by the
General Manager and will include a Scope of Work and schedule.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
The proposed PSA is a new contract. The PSA amount and budget necessary for the
project are presented in the attached Budget Information Table. Authorization of
$2,139,998 for Consultant design services is being requested, as well as the budget
reallocation of $626,458 from Contingency to Phase 3 Design. Also requested is the
reallocation of $180,000 from Phase 2 Preliminary Design to Phase 1 Project
Development. A thorough and detailed Project Development was performed which
substantially reduced scope of the Preliminary Design.
BUDGET IMPACT
® This item has been budgeted. (Line item: 2003-04 CIP Budget, Section 8, Page 58)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Background
The secondary plant was constructed in 1982 and much of the mechanical equipment
has exceeded its useful life. The required modifications will increase reliability, improve
performance, lower operations and maintenance costs, and improve health and safety
issues. This project is in keeping with industry practices as required for reliable and
dependable plant operations. The required modifications are consistent with the
District's System Replacement Plan/ Replacement Planning Model.
Wdephagenda\Board Agenda Repons12004 Board Agenda Repor1s10204U1em 13(j).MW H Americas.doc
Revised: 06/04/03 Page 2
Consultant Evaluation and Selection Procedures
A Request for Proposals was issued on November 24, 2003 to seven engineering
design firms. Five firms submitted proposals on December 22, 2003: Black & Veatch,
Brown and Caldwell, CGvL Engineers (teaming with Metcalf & Eddy), Lee and Ro, Inc.,
and MWH Americas, Inc. Carollo Engineers and PBS&J declined to submit proposals.
Submitted proposals were transmitted to the Staff Evaluation Team and evaluated in
accordance with defined procedures. Based on the Staff Evaluation Team ranking,
MWH Americas, Inc. had the highest ranking technical proposal, as well as the best
overall proposal as indicated in the attached Proposal Evaluation Report.
Proiect Schedule and Consultant PSA
The timeline of this project is critical in order to comply with the District's full secondary
commitments. The scope of work has been carefully defined, but due to the nature of
rehabilitation projects, some yet unidentified scope items may be needed to make the
project complete. Additional scope may also be necessary if any of the studies
determine a cost-effective modification to the existing system. In order to plan for such
scope additions and expedite the design to reduce schedule delays, the Consultant's
scope of work has been written to include a provision for the General Manager to
authorize proceeding with task orders totaling $100,000. This will allow the Consultant
to continue work on the design without delay to the schedule due to administrative
procedures. All such task orders will include a defined scope of work and schedule.
The PSA amount is higher than the budgeted amount for the design of this work, but
this amount is consistent with the other proposals. The PSA amount does not include
costs for construction or commissioning services; these amounts will be determined
once the design is complete and the scope of services is better defined. While the PSA
amount is higher than the budget for the Consultant design services, it does not exceed
the total budget for Consultant Services. Therefore, no budget increase is requested at
this time.
ALTERNATIVES
Operate and continue to repair and rehabilitate the existing facilities. Staff does not
recommend this option because it will not meet the District goals of reducing Operations
and Maintenance requirements, as well as not providing a reliable process to treat
wastewater at full secondary capacity.
CEGA FINDINGS
This project is included in the Full Secondary Subsequent EIR being prepared under
Job No. J-40-10. The Subsequent EIR is scheduled to be certified in March 2005.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Summary of Staff Evaluation of Proposals and Staff Recommendation
KM:jo
H:\deptlagenda\Board Agenda Reports\2004 Board Agenda Reports\0204U1em 130).MWH Americas.doc
Revised: 06/04/03 Page 3
REHABILITATION OF THE ACTIVATED SLUDGE PLANT AT PLANT NO.2
JOB NO.P2-74
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED
BUDGET
PROJECT/PHASE AUTHORIZED PROJECT INCREASE REVISED AUTHORIZED ION AUTHORIZAT TOTAL EXPENDITURE
BUDGET BUDGET /DECREASE BUDGET DATE REOUEST AUTHORIZATION TO DATE
�haw 1-Pr'ecl Developmom S 100,000 S 100,000 $ 180.000 $ 280.000 S 100.000 $ 180.000 $ 280.000 S lea—C
Phase 2-Preliminary Desi n S 383.218 $ 383218 $ 190.000 S 203,218 S 383.218 S 180.0001 S 203.218 S 1cC Cal
Phase 3-Des n $ 2229311 $ 2.299.311 S 626.458 S 2.225,769 S 785.771 S 2.139.998 S 2,925.769 S
P mass 4-Constnjchon S 14.817.780 S 14AI7.780 S S 14.817.780 S - S - S - $
Phase 5.Commis onthg S 25SA78 $ 255.478 $ S 255.478 S - $ $ $
Phase 6-Close•Ou/ $ 63,870 $ 63.870 S - S 63.870 S $ - $ - $
Phase 7-Conk e S 2.554.790 S 2.554.790 S 1626.458 E 1.928,332 S - $ - S S
PROJECT TOTAL $ 20474447 $ 20474.447 S S 20 a7a.4ai 1.268.989 f 2.139.998 $ 3.408.987 S 380.000
R—bv,saDla Costs
PROJECT NET I S 20.1744-7 S 2C 47444'1 S S 20374.447 S 1,268.989 S 2.139.998 1 S 3408.987 S 390 C•__
PSA/Contract
L0"—'2n P. S 2196.626 S 2.196.626 S S 2,196.626 S - S 2,139.998 S 2 139998 S
mtrudion Contract S 12.909.671 S 12.909.671 1 S -IS 12.909.671 S S - $ .11
EDW 00376200,
Professional Services Agreement Status Report
REHABILITATION OF THE ACTIVATED SLUDGE PLANT AT PLANT NO. 2
JOB NO. 132-74
Total Project Budget: $20,474,447
Consultant: MWH Americas, Inc.
Start Date of Project: April 12, 2004
Date Amendment Description Cost Accumulated
Costs
2/25/04 Original PSA Original Design Services 2,139,998 2,139,998
EDMS: 003762565
Rehabilitation of the Activated Sludge Plant at Plant No. 2
Job No. P2-74
Proposal Evaluation Report
Request for Proposals (RFPs) were sent on November 24, 2003 to the following seven
engineering consulting firms:
• Black & Veatch
• Brown and Caldwell
• Carollo Engineers
• CGvL Engineers (teaming with Metcalf & Eddy)
• Lee and Ro
• MWH Americas, Inc.
• PBS&J
Carollo Engineers and PBS&J declined to submit proposals. As a result, there were
five responsive proposals received on December 22, 2003. Proposals were
transmitted to an evaluation team comprised of six District staff members. The team
met on January 6, 2004 to evaluate the proposals. Each proposal was scored from 1
to 10 (10 being best) in six categories described below:
1. Project Approach (Evaluation Criteria Weighting Factor = 5) Rates the
Consultant's understanding of the technical aspects of the Scope of Work
included in the RFP and their approach to the work, methodology, and task
breakdown.
2. Plan for Managing and Performing the Work, and Quality Control
(Evaluation Criteria Weighting Factor= 4) Rates the Consultant's project
management methods and procedures for performing the tasks and interacting
with District staff, as well as their Communication Plan, Document Control
Plan, and Quality Control Plan.
3. Proposed Schedule (Evaluation Criteria Weighting Factor= 3) Rates the
Consultant's proposed schedule, level of effort in scheduling project details,
and scheduling tools and techniques.
4. Staff Qualifications (Evaluation Criteria Weighting Factor = 3) Rates the
Consultant's proposed team members in terms of educational background,
professional qualifications, experience, and current work location.
5. Related Company Experience (Evaluation Criteria Weighted Factor = 3)
Rates the Consultant's recent experience on projects similar to the Scope of
Work as related directly to the design and construction support for this project.
6. Team Organization (Evaluation Criteria Weighted Factor = 1) Rates the
Consultant's proposed project organizational chart and the appropriateness of
staff assignments.
003762573
r
After reviewing and evaluating the proposals, the Evaluation Team ranked the five
proposals according to the score achieved. The attached Table No. 1 presents the
results of the team evaluation and the proposals received. The two top ranked firms
were ranked as follows:
1. MWH Americas, Inc. 972 Points
2. Black & Veatch 855 Points
The following is a summary of how the evaluation team collectively viewed the top
ranked consultant:
MWH Americas, Inc.
The MWH Americas, Inc. proposal was collectively ranked as the best overall
proposal received. This proposal was ranked first by five of the six reviewers. Overall
this proposal was viewed as having been very detailed and responsive with a clear
understanding of the project. The staff proposed for the project was viewed as
excellent, and all the major team members are located in the same, local office.
There was some concern about their lack of recent experience at the District,
especially in terms of meeting our sophisticated Instrumentation and Control
standards. MWH Americas, Inc., however, acknowledged this fact in their proposal.
To demonstrate their proactive willingness to comply with the District's standards,
they purchased the Intergraph PDS software and hired Intergraph to train their
instrumentation design engineers on both the software and the District standards.
MWH Americas, Inc. also included in their proposal a sample design configured to the
District's standards of an activated sludge aeration control system they recently
developed for the City of Simi Valley. The following attributes formed the basis for
MWH Americas, Inc.'s high ranking:
1. Technically competent and very communicative Project Manager and Project
Engineer.
2. Solid understanding of the scope of work and needs of the District.
3. Thorough Quality Control plan.
4. Excellent team members
5. Major team members located in the same, local office.
6. Proactive demonstration to show willingness and ability to comply with the
District standards.
Fee Proposals
After the final ranking of the technical proposals, the sealed fee proposals submitted
by all the firms were opened. The total fee received from the consultants arranged in
the order of the final technical ranking was:
MWH Americas, Inc. $2,358,559
Black & Veatch $2,945,024
CGvL Engineers $1,707,146
Brown and Caldwell $1,802,000
Lee & Ro, Inc. $1,993,754
003762573
T
The MWH Americas, Inc. proposal was the second highest proposal at $2,358,559.
This proposal seems to be comparatively in line with the other candidates, and the
differences did not warrant a change in the panel's choice. The review panel
recommended award of the PSA to MWH Americas, Inc. pending a meeting to verify
the entire package with the consultant.
Following the selection process, OCSD staff and MWH Americas, Inc. met to review
and verify the scope of work. The complete project scope and fees were discussed.
Without cutting the scope of work, the total labor hours were reduced by streamlining
tasks and combining meetings. The revised proposal was amended to $2,039,998.
Staff is recommending the authorization of an additional $100,000 to be added for
miscellaneous task orders as approved by the General Manager. This contingency
will expedite the continuation of work during the design phase in order to meet the
tight schedule mandated by the Full Secondary program.
Based on the data provided above plus the highest technical ranking, Staff
recommends that MWH Americas, Ins. be awarded the Professional Services
Agreement (PSA) for Rehabilitation of the Activated Sludge Plant at Plant No. 2, Job
No. P2-74 for a total design fee not to exceed $2,139,998.
KTM:
EDMS:003762573
003762573
TABLE 1
Rehabilitation of the Activated Sludge Plant at Plant No. 2
Job No. P2-74
Veatch Caldwell
Reviewer A 132 131 138 118 155
Reviewer B 143 143 120 108 151
Reviewer C 150 129 186 132 175
Reviewer D 128 119 124 109 141
Reviewer E 157 157 115 125 185
Reviewer F 133 118 139 104 159
TOTAL 855 814 837 719 972
SCORE
AVERAGE 78 74 76 65 88
SCORE
TECHNICAL 2 4 3 5 1
RANKING
TABLE 2
Rehabilitation of the Activated Sludge Plant at Plant No. 2
Job No. P2-74
Black & •wn
Veatch
Caldwell
Hours 21,321 12,462 15,143 16,552 15,533'
(Phase 3,
Design)
Costs, $ $2,945,024 $1,802,000 1,707,146 1,993,754 2,358,559"
(Phase 3.
Design)
Cost per hr, $138/hr $145/hr $113/hr $120/hr $152/hr`x
$/hr
(Phase 3,
Design)
Note: Proposal changed to S2,039,998 (14,333 hours) and also includes a
S100.000 task order authorization for a total of S2,139,998.
*' The negotiated average hourly rate is $142/hour
EDMS: 003762573
003762573
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT item Number Item Number
PDC04-11 13 k
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Jim Herberg, Engineering Manager
SUBJECT: REHABILITATION OF ELLIS AVENUE PUMP STATION, JOB NO 1-10
GENERAL MANAGER'S RECOMMENDATION
Authorize the circulation of the revised Notice of Preparation for the Rehabilitation of
Ellis Avenue Pump Station, Job No. 1-10, for public review.
SUMMARY
• Replacement of the Ellis Avenue Pump Station is needed to balance flows between
Reclamation Plant No. 1 and Treatment Plant No. 2 in accordance with the 2002
Interim Strategic Plan Update. The Ellis Avenue Pump Station diverts some of the
flows destined for Treatment Plant No. 2 to Reclamation Plant No.1 to match the
treatment capacity at each plant. Secondly, the Station is needed to maintain a
minimum flow to Reclamation Plant No. 1 to maximize flows available for
reclamation by the Orange County Water District.
• The full replacement of the Ellis Avenue Pump Station was not included in the 1999
Strategic Plan Program Environmental Impact Report, therefore, the District must
prepare and circulate a Subsequent Environmental Impact Report (EIR). A Notice of
Preparation (NOP) of an EIR was released to the public in August 8, 2003. The NOP
discussed two potential pump station sites.
• An NOP Scoping Meeting was held on August 25. 2003, and public comments and
suggestions have been used to develop more potential pump station sites for
consideration. There was significant public input against the two sites presented at
the meeting. After the meeting, additional alternative pump station sites were
identified and screened for feasibility. A total of eleven sites have been identified
and have been given an initial engineering screening.
• Staff held another public workshop meeting on December 2, 2003 to get public input.
The public was asked for input on the need for the project, important criteria to
consider when evaluating alternatives, and which of the eleven alternatives they
liked best and least, and why.
• Based on the engineering and technical evaluation, the public input from the two
public meetings, legally mandated CEQA requirements to consider a reasonable
range of alternatives, and a life cycle cost evaluation, Staff proposes five sites of the
eleven be included in the Revised NOP.
Revised: 06/04/03 Page 1
PRIOR COMMITTEE/BOARD ACTIONS
On September 25, 2002, the Professional Services Agreement (PSA) was approved by
the Board of Directors, and on November 19, 2003, Amendment No. 1 to the PSA was
Board approved with Malcolm Pirnie, Inc., for Ellis Avenue Pump Station Rehabilitation,
Job No. 1-10, for a total current contract amount not to exceed $3,586.082.
PROJECT/CONTRACT COST SUMMARY
The total budget estimate for Ellis Avenue Pump Station Rehabilitation, Job No. 1-10 is
$33,837,000. This request will not increase or decrease the approved budget estimate.
BUDGETIMPACT
® This item has been budgeted. (Line item: FY 2003-04 Budget, Page 8-46)
❑ This itern has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The attached map shows the eleven potential pump station locations. A summary of
the two public meetings on the project is presented below.
NOP Scoping Meeting, August 25, 2003
This meeting was held as part of the District's normal procedure during CEQA. A
presentation was made describing the CEQA process and the two recommended
alternatives for further CEQA detailed study. An open forum of questions and answers
were made throughout the duration of the meeting. No formal agenda was followed.
Approximately 205 people attended the meeting.
The outcome of the meeting was clear public opposition to the two alternatives
presented. The District committed to going back to see if some of the new sites
suggested at the meeting would meet project objectives. In addition, the District
committed to investigating other potential sites not suggested.
Public Workshop, December 2, 2003
A public workshop was held at the Mile Square Golf Course Clubhouse on December 2,
2003. The workshop was held to inform the public and to receive input from the
surrounding residents about the considerations they felt were most important in
evaluating the alternatives, and the alternatives that appeared to be most promising and
should be retained for further consideration at the upcoming EIR Scoping Meeting.
Sixty-six members of the public attended the workshop.
Essential background information on the pump station project were presented to the
attendees, namely: (1) the wastewater flow management problem facing the District
and the community: (2) the alternative locations now being considered for siting a new
Fc,,�ed CC,04(,; Page 2
A
pump station to solve this problem; and (3) the steps in the environmental study and
project selection process.
Following a question and answer period, the rationale for the small group discussion
was presented. The results of the small group discussion sessions would be thoroughly
considered by the District and, where appropriate, be used to narrow the current pump
station candidate alternatives to a shortlist of alternatives for consideration at the NOP
Scoping Meeting in early 2004. The attendees were formed into six discussion groups
of eight to twelve people. Each participant had already received a prepared Discussion
Guide, Problem Statement, and Fact Sheet. The handouts contained enough
information and data about the proposed Ellis Ave Pump Station. (Each of these
support materials is found in the Appendix to this report).
Each group was charged with arriving, if possible, at a consensus about the topics and
issues it discussed and with selecting a spokesperson to deliver a verbal summary of its
findings to all participants. The findings and conclusions of the six discussion groups
have been aggregated into four distinct categories, each reflecting a different level of
agreement among the groups about a given topic or issue. These categories are:
Consensus, Near Agreement, Majority, and Small Minority.
Consensus: There was unqualified or unanimous agreement among the workshop
discussion groups about the following:
• The wastewater flow management problem facing the District's service area is serious
and important and needs to be addressed now.
• The potential impacts and consequences to homes in the study area related to site
acquisition, pump station construction and operation are the most important
considerations in evaluating the candidate alternatives.
• Alternative "A" (siting the pump station at Reclamation Plant No. 1's north corner, near
Administration Building) is the most favorable and promising option for solving the
service area's wastewater flow management problem.
• Alternatives "E" (Callens Ranch) and "I" (Ellis and Bushard corner) are the pump
station alternatives least worthy of further consideration.
Near Agreement: The widespread support among Workshop participants with respect
to the following findings was tempered by the fact that it represented a level of
agreement that was just below consensus:
• Alternative "C" (siting the pump station at Reclamation Plant No.1's south comer) is
one of the most favorable and promising pump station alternatives under
consideration.
• Alternative "F" (Fountain Valley High School north or south site) is one of the least
promising and acceptable pump station alternatives under consideration.
• Cost is the least important consideration in determining the relative merits of the pump
station alternatives.
Majority: The following finding was reported by half or just more than half of the
discussion groups:
Revised: 06/04/03 Page 3
e
• Alternative "B" (a commercial site located directly north and across the street from
Reclamation Plant No.1) is a promising option that should be retained for further
study.
• Alternatives "H" (Methodist Church) and Alternative K (Garfield and Bushard) should
be dropped from further consideration.
Small Minority: The following were the suggestions of one or two participants who
represented a small percentage of the output of their respective discussion group:
• Retain Alternative "D" (Moila School) for further study
• Retain Alternative "G" (Talbert and Bushard) for further study
• Retain Alternative "J" (Underground at Ellis and Bushard intersection) for further study
Upcoming EIR Process
Schedule considerations for this project are critical to meeting our operational goals,
including bypassing flows for construction of the Replacement of the Treatment Plant
No. 2 Headworks in 2008, and providing flows to the Orange County Water District for
Reclamation. The present EIR schedule is essential in order to have the pump station
constructed in time for these needs:
• Revised NOP — Late February/ Early March, 2004
• Scoping Meeting— March, 2004
• Draft EIR —June /July, 2004
• Draft EIR Comments Received — August, 2004
• Public Hearing —August, 2004
• Certification of Final EIR by the District's Board of Directors — September, 2004
ALTERNATIVES
Not circulating the NOP at this time would result in delays to the project and our ability
to divert flows for reclamation and replacement of the Treatment Plant No. 2
Headworks.
CEGA FINDINGS
This project was not included in the 1999 Strategic Plan Program Environmental Impact
Report. A Subsequent EIR is being prepared.
ATTACHMENTS
1. Location Map for alternative Pump Station Locations
2. Fact Sheets from Public Workshop
JDH:sa
HAntgloballAgenda Draft ReportsTDCU-10 AR—NOP Release_020504 PDC.doc
Revised: 06/04/03 Page 4
tit
+ �#.K�•'� f":�, � ' *��� � i �' s to ifltl Zltr'�itg+�,i" ( y
�F�1 •�� �Mr..l+�IW��.�r. l r' i�� �' �l ���.• � y�
. �: ` { ' �"»i'.� 'S; Z �. i� .°.»✓A# i {gyp `+���� f41"7�' W t • H L
� i +; �� 4. i �""s i�i?i' ,fin �� n jib J;` �� �•. ,�} •� ...
foul I
•; � ' f �f i � � � K :; (Fi •� ��,��'�,�e,1.���+`!y!',�'��' 8J� � .. art �,; t
tllY''•' _ r �. � ] 9''�t.f !�' i� +wtii3t.� �� .t, j '^j
�['.1tJ � 4:• } ' ',Fyj P��'►`f`N�•'� � � �j rT'�''• !`� r'i771 t ��' •• � a.. �`,L; �•,
,� � J..L -�I R4� �lK ..i�7i:.. •� 'C"�l K6 S y�,� �I:� 1..
ry�
Ili M
Awl
'` . wl i }� },r i ; ,..t~YI. j�� a ai nil ( '' trx . �t,3 - '.{ ♦- `j t
f
ATTACHMENT 2
p FACT SHEET
Replacement of Ellis Avenue Pump Station Project
December 2, 2003
1. WHAT HAS BEEN DONE TO DATE?
• Public comments and suggestions from the August 25, 2003 Notice of
Preparation (NOP) Scoping Meeting have been used to expand the study
area and to develop more potential pump station sites for consideration.
• We have developed clear minimum requirements that any suggested site
must meet in order to be given further consideration as an alternative.
• We are revising the NOP and will issue a Revised NOP based on previous
public comments and your input from tonight's meeting.
2. LIST OF POTENTIAL SITES
ALTERNATIVE A: OCSD Reclamation Plant No. 1 (north corner)
ALTERNATIVE B: Ellis & Pacific
ALTERNATIVE C: OCSD Reclamation Plant No. 1 (south comer)
ALTERNATIVE D: Moiola School
ALTERNATIVE E: Callens Ranch
ALTERNATIVE F: Fountain Valley High School (north or south site)
ALTERNATIVE G: Talbert & Bushard
ALTERNATIVE H: Methodist Church
ALTERNATIVE 1: Ellis and Bushard
ALTERNATIVE J: Ellis Avenue (underground)
ALTERNATIVE K: Garfield and Bushard
J
Alternative B — Ellis and Pacific
Z.
•-1 _ l 405 Fwy
The above photo depicts an aerial view of the proposed Ellis Avenue, North of
Plant No. 1 site. North is to the top of the photo. Ellis Avenue is shown running
east and west at the top third of the photo and Pacific is shown running north
and south at the top center of the photo. The existing Plant No. 1
Administration Building is shown at the lower left center of the photo. The
proposed site consists of one of the existing commercial buildings located
north of Ellis Avenue. This site would be surrounded by existing commercial
properties.
FACTS',
• Site construction in property currently zoned commercial.
• Residences within 1000 feet of construction.
• Traffic impacts:
c On Ellis Avenue - Bushard to the 405 Fwy
c On Pacific Street— Up to 700 feet
• Size of Site = 25,000 — 35,000 square feet, with width greater than 80
feet.
• Major construction tie in on Pacific Street and on Ellis Avenue in and
out of OCSD Reclamation Plant No. 1
• Cost Estimate: HIGH ($44,000,000)
5
Alternative D — Moiola School
OL
... � r_ •.'Q+� � � � �._J..'-�. _� -ter• �- -.. / -+...a t
This photo illustrates the access to the school site. Access is limited to Finch
Avenue and Redwood Street, which connect to Bushard Street via four different
avenues. The photo is looking south with Ellis Avenue shown at the bottom of
the picture. Please note the Callens Comer Shopping Center to the left has a
delivery alleyway that extends off Ellis Avenue all the way back to Finch
Avenue. Swimming pools can be seen on the residential property that backs up
on the alley.
FACTS:
• Site construction on school property. Behind commercial shopping
center.
• Residences within 200 feet of construction.
• Traffic impacts:
o On Finch - Moiola School to Redwood Street
o On Callens Circle - Finch to Ellis
o On Ellis— Callens Circle to 405 Fwy
• Size of Site = 23,000 square feet, with width greater than 80 feet.
• Major construction on Ellis.
• Cost Estimate: LOW ($32,884,000)
7
Alternative F — Fountain Valley High School
(north or south site)
mum
Arnow
I
2 _ •y• r 1 f -
The above aerial photo illustrates the Fountain Valley High School, which is north of Talbert
Avenue and east of Bushard Street. Bushard Street is visible in the photo to the left of the
campus. There are two alternate sites proposed at this location, as marked by black boxes.The
closest residential properties are 150 to 200 feet away. Across Bushard, to the west, is a new
retirement community that is currently under construction
FACTS:
• Site construction on property currently zoned public.
• Residences within 200 feet of construction.
• Traffic impacts:
c On Bushard- FVHS to Ellis.
On Ellis—Bushard to 405 Fwy
• Size of Site = 23,000 square feet,with width greater than 80 feet.
• Major construction ties on Ellis and Bushard
• Cost Estimate: MEDIUM ($40.690,000)
9
Alternative H — Methodist Church
V +:
This photo illustrates the United Methodist Church property. Bushard Street is
shown to the right and Fallen Leaf Circle is to the south.
FACTS:
• Site construction on property currently zoned commercial
• Residences within 100 feet of construction.
• Traffic impacts:
o On Bushard - Pump Station Site to Ellis.
c On Fallen Leaf Circle —Adjacent to Church to Bushard
c On Ellis — Bushard to 405 Fwy
• Size of Site = 23,000 square feet, with width greater than 80 feet.
• Major construction ties on Ellis and Bushard
• Cost Estimate: MEDIUM ($34,219,000)
' 11
Alternative J — Ellis Avenue (underground)
..SI :7
0xv,
a `r
r. O -
The above photo depicts an aerial view of the proposed Ellis Avenue / Bushard
Street site. North is to the top of the photo. The existing Ellis Avenue Pump
Station and Diversion Structure 95 are located below the street at the
intersection. The proposed pump station would be located west of Bushard
Street and below the pavement in Ellis Avenue, similar to the existing pump
station. The facility would have to encroach on the cul-de-sac north of Ellis
Avenue, as depicted by the dashed black rectangle.
FACTS:
• Site construction on street right-of-way.
• Residences within 100 feet of construction.
• Traffic impacts:
o On Bushard - At Ellis intersection
o On Ellis — 300 feet west of Bushard to 405 Fwy
• Size of Site = about 20,000 square feet, with width greater than 80 feet.
• Major construction ties on Ellis and Bushard
• Cost Estimate: LOW ($33,190,000)
3. WHAT ARE THE NEXT STEPS?
1. OCSD will prepare and deliver a FEEDBACK REPORT from this
meeting — Jan, 2004
2. ENVIRONMENTAL REVIEW (CEQA)
• The Revised Notice of Preparation (NOP) will be prepared
incorporating the information gained from tonight's meeting and will
be mailed to you — late Dec, 2003
• A formal Public Scoping Meeting will be held —Jan, 2004
• A Draft Environmental Impact Report (EIR) will be prepared and
released for a 45-day public review period — April — May, 2004
• A Public Hearing on the Draft EIR will be held —June 2004
• A Final EIR will be prepared —July — Aug, 2004
e OCSD Board will certify the Final EIR — Aug, 2004
3. DESIGN of the project facilities is scheduled to take place — May, 2004 —
July, 2005
4. CONSTRUCTION of facilities — November, 2005 — April, 2007
-- t1.-i,Iv. - I- t-V V1uI.. 1-1llJIIll..l.iIII11J OUI VIl1GJ IVI O1JLJ IVV. 1 I IUL VVQIG GVQIUCALl-, .l I[[
accordance with District procedures and the Black & Veatch/CDM team received the
highest ranking. Additional information on the evaluation ranking is contained in the
attachment.
The history of project cost estimates is presented in Table No.1 . The approved
FY2003/04 CIP Budget included S22,084,000 for Phases 2 and 3 consultant
engineering services. In November 2003, Staff prepared an estimate of the Phases 2
and 3 consultant services, based on changes in the scope of the project and the final
engineering Scope of Work presented in the Request for Proposals. At that time, Staff
estimated the consultant engineering fees of Phases 2 and 3 to be $18.928,000. The
proposed fees, submitted in the proposals, were $16,122,899 from Carollo Engineers
and $20,930,111 from Black & Veatch Corporation. Several meetings were held with
Black & Veatch to discuss the basis of their fee estimate and to clarify the District's
Scope of Work. Based on these meetings, Black & Veatch Corporation's negotiated fee
fnr Phocn ') onrl Phoco '2 nnriinnnrinn cnntiroc is (Z1 7 RQF AQ'� Thic nrnnncArl fAA is
PDC COMMITTEE Meeting Date To Bd.of Dir.
02/05/04 02/25/04
AGENDA REPORT Item Number Item Number
PDC04-10 13(I)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: David MacDonald, Project Manager
SUBJECT: Secondary Activated Sludge Facility 2 at Plant No.1 , Job No. P1-102
GENERAL MANAGER'S RECOMMENDATION:
(1) Approve the Professional Services Agreement with Black & Veatch Corporation to
provide engineering services for the Secondary Activated Sludge Facility 2 at Plant
No.1 , Job No. P1-102, for an amount not to exceed $17,896,463; (2) Authorize the
General Manager to issue Task Authorizations not to exceed S200,000; and (3)
Authorize the General Manager to issue Task Authorizations between $200,000 and
$500,000 providing there is a time sensitive need AND a PDC meeting cannot be called
within 72 hours.
SUMMARY:
• The purpose of this project is to prepare a preliminary design report (Phase 1) and
construction plans and specifications (Phase 2) for a new activated sludge facility at
Plant No.1 .
• Job No. P1-102 is one of six projects designated by the Capital Improvement
Program (CIP) as required to meet the District's goal of full secondary treatment by
the year 2012. The project will also be a future source of secondary effluent for the
Ground Water Replenishment System (GWRS).
• The Professional Services Agreement (PSA) includes the following:
1 . Preparation of a Preliminary Design Report to evaluate the proposed facilities
and confirming the process criteria.
2. The final design of the aeration basins, clarifiers, return sludge system, waste
Sludge system, sludge thickening facility and anaerobic digesters.
3. The preparation of a Value Engineering Study, Constructability Review and a
Construction Sequencing Plan.
4. Support services for the District's Supplemental EIR and the Air Quality
Management District (AQMD) permit.
5. Preparation of bidding and construction documents.
• Requests for proposals were sent to seven engineering firms. Four engineering
firms teamed to provide two proposals to the District. The proposals were
evaluated in accordance with defined District procedures and Staff recommends the
approval of the PSA to Black & Veatch Corporation, teamed with Camp, Dresser &
McKee Inc., for an amount not to exceed $17,896,463. Staff believes the
R.-s,� oa o3 Page 1
In July 2002, the District elected to upgrade its treatment capabilities to full secondary
treatment. To achieve this goal, a project was developed for Plant No.1, which
consisted of new activated sludge facility and two new anaerobic digesters. The cost of
this project was included in the FY2003/04 CIP. In October 2003, the project was
amended to include a sludge thickening facility. The major elements of this project
include the following:
1. Aeration basins
2. Clarifiers
3. Operations building with a power room, blower room, and control room
4. Waste sludge thickening facility
5. Anaerobic digesters
6. Improvements to Power Buildings No.1, 2, and 5.
Revised: 06/04/03 Page 2
J The proposals to provide engineering services for Job No. P1-102 were evaluated in
accordance with District procedures and the Black & Veatch/CDM team received the
highest ranking. Additional information on the evaluation ranking is contained in the
attachment.
The history of project cost estimates is presented in Table No.1. The approved
FY2003/04 CIP Budget included $22,084,000 for Phases 2 and 3 consultant
engineering services. In November 2003, Staff prepared an estimate of the Phases 2
and 3 consultant services, based on changes in the scope of the project and the final
engineering Scope of Work presented in the Request for Proposals. At that time, Staff
estimated the consultant engineering fees of Phases 2 and 3 to be $18,928,000. The
proposed fees, submitted in the proposals, were $16,122,899 from Carollo Engineers
and $20,930,111 from Black & Veatch Corporation. Several meetings were held with
Black & Veatch to discuss the basis of their fee estimate and to clarify the District's
Scope of Work. Based on these meetings, Black & Veatch Corporation's negotiated fee
for Phase 2 and Phase 3 engineering services is $17,896,493. This proposed fee is
lower than the FY2003/04 CIP Budget and the Staff's updated estimate of November
2003.
ALTERNATIVES
The District prepared an Interim Strategic Plan in September 2002. The purpose of the
Interim Strategic Plan Update (ISPU) was to evaluate and compare several wastewater
treatment alternatives to meet potential future regulations. The ISPU developed an
Alternative C, which contemplated the ability to provide full secondary treatment. In July
2002, the District elected to proceed with full secondary treatment, based upon
information in the ISPU. This project is necessary for the District to achieve its goal of
full secondary treatment
CEQA FINDINGS
Construction of Job No. P1-102, a new activated sludge facility at Plant No.1, was not
included in the 1999 Strategic Plan Program EIR. A Supplemental Program EIR is
being prepared and will be completed before the project is advertised for bids.
ATTACHMENTS
1. Budget Information Table
2. PSA Status Report
3. Summary of Staff Evaluation of Proposals and Staff Recommendation
4. Table No.1 History of Project Costs
DM:eh:ba
Revised: OW04/03 Page 3
BUDGET INFORMATION TABLE
New Secondary Activated Sludge Facility at Plant No.1
Job No.P1-102
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED
PROJECT,'PHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZEDTO AUTHORIZATION TOTAL EXPENDITURE
BUDGET BUDGET INCREASE!DECREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE
Phase 1-Prcect D—I meat $ 1010.000 $ 100,000 $ 100.0D0 10D.D00 S 100000 S Io r
Phase 2-Preliminary Desi n $ 2.547.000 $ 25.470,000 $ 3.574,734 S 6,121.734 S 849,000 $ 5.272.734 $ 6.121,734
Phase 3-Design S 23,7840000 $ 230784,000 S 3.574,7341 $ 20.209.266 S 3.398.000 $ 12.623.729 S 16.021.729
Phase 4•Gonstruclion S 188,570.000 $ 188.570,000 S 188.570.000 $
Phase 5.Commissionma S 1,699.000 S I b699,000 S 1.699.000 $
Phase 6.Close-Out 424.000 $ 424,000 $ 4240000 $
Phase 7-Conlin encv S 33,976.000 $ 33,976.000 $ 33.976,000
PROJECT TOTAL S 251.100.000 $ 251,100.D00 $ 251,100.000 4.347.000 S 17.896.463 S 22243.463 100.000
Pwmbursable Costs 0 $ 665.211
PROJECT NET I S 251100.000 1 S 251,100.0D0 $ 251,100000 347.000 1 S IT231.252 1 5 222434631 S 100,000
PSA/Contract
Desl nPSA S 22.084.000 $ 22.080000 $ 22.080.000 -
Constnxhon Contract $ -
Professional Services Agreement Status Report
Secondary Activated Sludge Facility 2 at Plant No. 1
Job No. P7-102
Total Project Budget: $251,100,000
Consultant: Black & Veatch
Start Date of Project: April 2004
Date Addendum Description Cost Accumulated
Costs
Pending Original Design/Consulting Services for Phase 2 & 3
PSA $17,896,463 None
02/19/04
Revised 05/14/98
New Activated Sludge Facility at Plant No. 1
P1-102
Staff Evaluation of Proposals to Provide Engineering Services
The following interested consulting firms received Requests for Proposals:
• Carollo Engineers
• Camp Dresser& McKee, (CDM)
• Black & Veatch
• Earth Tech
• Brown and Caldwell
• Montgomery Watson Harza
• Malcolm Pernie
Brown and Caldwell, Montgomery Watson Harza and Malcolm Pernie declined to
submit a proposal. Black & Veatch partnered with CDM for this project. Also, Carollo
Engineers partnered with Brown and Caldwell. As a result, there were two (2)
responsive proposals received on December 4, 2003. Proposals were reviewed in-
house by a review panel from December 5th to December 16th, 2003. Formal
interviews with both responsive teams and an OCSD review panel were conducted on
December 17, 2003. The review panel consisted of five voting members. Each
proposal was graded from 1 to 10 (10 being best) in six categories described below:
1. Understanding of the Project: The proposal should contain a description of the
project goals and objectives. The Consultant should be familiar with the District's
commitment to achieve full secondary treatment by December 2012. The
proposal should discuss how each of the major project elements contributes to
achieving the goals and objectives. To demonstrate an understanding of the
scope of work, the Consultant should have developed an outline of the project
deliverables; for example a list of project drawings, outline of the project
specification, and an outline of the geotechnical report. The consultant should
have also demonstrated its knowledge of the related projects such as P 1-82, P1-
76, P1-97and J-36 and how the P1-102 project will interface with other District
projects. The proposal should provide insights into achieving the District's goal
and objectives.
2. Project Schedule: The proposal should contain an outline of major project tasks
required to complete the work of Phase 2, Preliminary Design and Phase 3,
Design. The schedule should have been conformed to the District's Work
Breakdown Structure (WBS). The proposal should integrate the project tasks
with the District's WBS, estimate time lines for all tasks and identify task
constraints. A list of major project milestones should have been included. The
proposal should include a resource loaded schedule.
1`
Y
3. Project Approach: The proposal should outline the Consultant's approach to
the technical and management issues for the project. The proposal should
discuss the approach to developing the design details based on the projects
concept report. It should explain how the Consultant, working with in the
framework of the Scope of Work, will use technical memos, workshops and
focused meetings to achieve consensus in design details while incorporating the
Districts Design Guidelines into the project. It should also describe how the
Consultant Team, in particular the Instrumentation and Controls group, will
interface with the District's Process Control Integration Division and the O&M
Division. A Project Management Plan should have been included. The Plan
should identify the key management personnel and their roles and
responsibilities. It is the intention of the District to establish an integrated Project
Team consisting of District staff, Consultant and sub consultants. The plan
should discuss how the project will be organized to achieve a close working
relationship among the team members and explain how the work will be
managed between engineering disciplines and between different work centers.
An outline of a Communication Plan, Document Control Plan and a Quality
Control Plan should have been included in this proposal.
4. Team Organization: The proposal should have a consultant project
organizational chart. It should describe the roles and responsibilities of the key
team members. The organizational chart shall include all team members
including designers and CAD operators. The proposal should have discussed
the work to be performed by each Team Member and the location where the
work will be performed. The relationship with sub consultants and any special
teaming arrangements should have been included. The proposal should
describe how the staff will meet the requirements of the resource loaded
schedule.
5. Staff Qualifications: The proposal should describe the education, experience
and technical certifications of the proposed project staff. The staff member's
technical discipline and location where work will be performed should have been
included. Emphasis should have been placed on the qualifications and locations
of the Project Manger and the I&C Design Manger.
6. Related Company Experience: The proposal should describe the firm's recent
experience on projects which are similar to the New Activated Sludge Facility
(P1-102) for individuals proposed on the project.
Two proposals were received from four of the firms who teamed up for the project.
Proposals were received from Black & Veatch teamed with CDM and Carollo Engineers
teamed with Brown and Caldwell.
The two proposals were evaluated and all teams were interviewed on December 17,
2003. After reviewing and grading the proposals and conducting the interviews, the two
teams were ranked according to the score achieved. The following summarizes the
attached ranking results:
1. Black & Veatch Corporation 1347 Points
2. Carollo Engineers 1001 Points
The following is a summary of how the evaluation team collectively viewed the top
ranked consultant:
Black & Veatch Corp.
The Selection Committee gave the Black & Veatch proposal the highest ranking for
several reasons. Black & Veatch, with CDM, has the stronger management team with
local experience in large and similar projects and past project experience with the
District. The Black & Veatch approach to the project includes a dedicated staff for
project controls and scheduling, which is compatible with the District's PMO structure.
The Black & Veatch approach also included a separate team to provide Quality Control
Reviews of all submittals and the final product (plans and specifications). The Black &
Veatch proposal also provided an in depth evaluation of technical options which could
reduce the project's capital and O&M costs, such as the number, size and configuration
of the secondary clarifiers. Table A presents the scores from each reviewer and
proposed costs. The following attributes formed the basis for the Black & Veatch high
ranking:
1. Excellent management team
2. Strong knowledge of project needs and reuse requirements
3. A separate and highly qualified Quality Control Team
4. A technical approach to reduce capital and operating costs.
Fee Proposals
After the final ranking of the technical proposals , the sealed fee proposals, submitted
by the firms , were opened. The total fees received from the consultants were:
1. Black& Veatch $20,930,111
2. Carollo $16,122,899
Several meetings were held with Black & Veatch to discuss the basis of their estimate
and to clarify the District's scope of work. Based on these meetings, the Black & Veatch
negotiated total fee for the Phase 2 and Phase 3 engineering services is $17,896,463.
This proposed fee is lower than the 03/04 CIP budget of $22,084,000.
Summary
The evaluation committee gave Black and Veatch the highest score. On average, the
scored is 35% higher. Black and Veatch's proposal has more hours resulting in a
higher estimated fee but the average hourly rate is lower, as shown in Table B. The
evaluation team was unanimous in their decision. Staff believes the negotiated fee and
man hour estimate reached with Black & Veatch is reasonable, giving the District the
best value while maintaining the scope of work.
TABLE A
New Activated Sludge Facility at Plant No. 1
Job No. P1-102
Black& Veatch
Caro .
and CDM
Reviewer A 281 195
Reviewer B 199 152
Reviewer C 280 256
Reviewer D 287 206
Reviewer E 300 192
TOTAL 1 ,347 1 ,001
SCORE
AVERAGE 269 200
SCORE
TECHNICAL 1 2
RANKING
TABLE B
New Activated Sludge Facility at Plant No. 1
Job No. P1-102
Black & Veatch
Caro .
and CDM
Phase 2 + 3 129,284 113,885
Hours
Phase 2 + 3 $17,896,463 ' $16,122,899
Costs. S
Cost per hr, S138.43 $141.57
for Ph2 + 3,
S/hr
Overhead 10900 970c
Rate. °o
Negotiated Fee
TABLE No. 1
P1-102
Secondary Activated Sludge Facility 2 at Plant No.1
History of Project Cost
Proposals
Cllo Black & Veatch Staff
Phase 03�04 aro ea Estimate
Nov 03
Submitted Submitted Negotiated
1. Development $100,000 NA NA NA NA
2. Preliminary Design
• Consultant $1,698,000 $6,230,340 $5,716,530 $5,272,734 $4,983,000
• Staff $849,000
3. Final Design
• Consultant $20,386,000 $9,892,559 $15,213,581 $12,623,729 $13,945,000
• Staff $3,398,000
4. Construction $188,570,000 NA NA NA NA
5. Commission $1,699,000 NA NA NA NA
6. Close Out $424,000 NA NA NA NA
7. Contingency $33,976,000 NA NA NA NA
Grand Totals $251,100,000 NA NA NA NA
Consultant Totals $22,084,000 $16,122,899 $20,930,111 $17,896,463 $18,928,000
Phases 2&3 only)
EDMS:003763056
f
MINUTES OF FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE MEETING
Orange County Sanitation District
Wednesday, February 11, 2004, 5:00 p.m.
A meeting of the Finance, Administration and Human Resources Committee of the Orange
County Sanitation District was held on February 11, 2004, at 5:00 p.m., in the District's
Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present:
Gary Streed, Director of Finance/Treasurer
Roy Moore, Vice Chair Robert Ghirelli, Director of Technical Services
Patrica Bortle Mike White, Controller
Bill Dalton Carol Beekman, Communications Services
Mike Duvall Manager
Joy Neugebauer Lisa Tomko, Director of Human Resources
James W. Silva Dionne Kardos, Public Information Specialist
Steve Anderson, Vice Board Chair Sonja Wassgren, Senior Principal Communications
Specialist
Directors Absent: Ingrid Hellebrand, Senior Public Information
Specialist
Brian Brady, Chair Ana Burkhart, Principal Communications Specialist
Shirley McCracken, Board Chair Jennifer Cabral, Public Information Specialist
Jean Tappan, Acting Committee Secretary
OTHERS PRESENT:
Toby Weissert
Don Hughes
Robert Moss
Craig Hartzheim
(2) APPOINTMENT OF CHAIR PRO TEM
Vice Chair Roy Moore chaired the meeting in Chair Brady's absence.
(10) CONSENT CALENDAR ITEMS
MOVED, SECONDED AND DULY CARRIED to approve all agenda items appearing on the
Consent Calendar not specifically removed from same, as follows:
a. Approve minutes of the December 10, 2003 Finance, Administration and Human
Resources Committee meeting.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 2 I
February 11, 2004 }
b. FAHR04-01 Recommend to the Board of Directors to receive and file Treasurer's
Report for the month of January 2004.
C. FAHR04-02 Receive and file Certificate of Participation (COP) Monthly Report.
d. FAHR04-03 Receive and file Employment Status Report as of January 28, 2004.
e. FAHR04-04 Receive and file OSHA Incidence Rates and Workers' Compensation
Claims and Costs Report.
f. FAHR04-05 Recommend to the Board of Directors to receive and file the Mid-Year
Financial Report for the period ending December 31, 2003
g. FAHR04-06 Recommend to the Board of Directors to receive and file Quarterly
Investment Management Program Report for the period October 1, 2003
through December 31, 2003.
h. FAHR04-07 Recommend to the Board of Directors to receive and file the SWAP
Report for the quarter ended December 31, 2003.
i. FAHR04-08 Recommend to the Board of Directors to adopt Resolution No.
OCSD 04-_, Amending Resolution No. OCSD 98-33, Amending Human
Resources Policies and Procedures Manual.
j. FAHR04-09 Recommend to the Board of Directors to approve SAFETY-POL-115,
Backflow Prevention Program, as provided for in Resolution No. OCSD
02-5, regarding the District's Injury and Illness Prevention Program Policy.
END OF CONSENT CALENDAR
Consideration of items deleted from Consent Calendar, if any.
(13) CLOSED SESSION
The Committee convened in Closed Session at 5:08 p.m. pursuant to Government Code Section
54957.6 to confer with Lisa Tomko, Human Resources Director, re Unrepresented Groups
Compensation and Benefits, Agenda Item No. 13(a) (1). Confidential Minutes of the Closed
Session held by the Finance, Administration and Human Resources Committee have been
prepared in accordance with California Government Code Section 54957.2, and are maintained
by the Board Secretary in the Official Book of Confidential Minutes of Board and Committee
Closed Meetings.
RECONVENE IN REGULAR SESSION: At 5:23 p.m., the Committee reconvened in regular
session.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 3
' February 11, 2004
(12) INFORMATION PRESENTATIONS
a. FAHR04-12 Communications Services Strategic Plan FY 2003-04 Update
The Communications Services staff presented an update on the eleven
Communications Services Strategic Plan elements. Ana Burkhart described
biosolids outreach activities, Fats, Oils and Grease (FOG) Community Education
Program and provided an update on GWR System communications activities;
Ingrid Hellebrand reported on community education and outreach programs and
planned activities for OCSD's 501h Anniversary; Jennifer Cabral described the
results in the construction/capital improvement program outreach element and
internal communications activities, specifically OCSD's newsletter, The Pipeline;
Dionne Kardos reported on corporate identity program activities; and Sonja
Wassgren reported on external communications activities, intranet development
and communications support of the legislative advocacy effort. Ms. Wassgren
announced that the District has received a $1 million allocation for federal funding
our move to secondary treatment and will continue to work with the legislative
lobbyists to increase the funding to $10 million for FY 2005-06. Director Tod
Ridgeway and Ms. Wassgren will be attending the annual Orange County
delegation luncheon on February 25.
Carol Beekman, Communications Services Manager, stated that the focus of the
division is providing clear communications throughout the agency. The next
quarterly update will be at the April FAHR Committee meeting.
(3) PUBLIC COMMENTS
There were no public comments.
(4) REPORT OF THE COMMITTEE CHAIR
Chair Pro Tern Moore did not have a report.
(5) REPORT OF THE GENERAL MANAGER
General Manager Blake Anderson was not in attendance.
(6) REPORT OF DIRECTOR OF FINANCE/TREASURER
Finance Director Gary Streed introduced Robert Moss and Craig Hartzheim, of Moss, Levy&
Hartzheim, contract internal auditors.
Mr. Streed also reported that the revised purchasing resolution is ready for consideration and it
will be presented to the Steering Committee at its February 28 meeting and to FAHR at its
March 10 meeting. After discussion, staff was directed to present the draft resolution to the
OMTS and PDC Committees at their March meetings and staff would then present comments at
the next FAHR Committee.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 4 `
February 11, 2004
Mr. Streed described the information included in the draft request for proposals for review of un-
assessed and under-assessed non-residential parcels. The Committee members asked that the
item be placed on the March FAHR agenda for additional discussion, prior to distribution of an
RFP.
(7) REPORT OF DIRECTOR OF HUMAN RESOURCES
Director of Human Resources Lisa Tomko did not make a report.
(8) REPORT OF COMMUNICATIONS SERVICES MANAGER
Communications Services Manager Carol Beekman did not make a report.
(9) REPORT OF GENERAL COUNSEL
Counsel was not present.
(11) ACTION ITEMS
a. FAHR04-10 MOVED, SECONDED AND DULY APPROVED TO: Approve the 2004/05
Budget Assumptions, Fiscal Policy Statements, and Budget Calendar.
Mike White reviewed the FY 2004-05 Preliminary Budget Assumptions for
economic assumptions, revenue assumptions, operating assumptions,
reserve assumptions, capital improvement program assumptions and debt
financing. He also outlined the important dates leading to adoption of the
FY 2004-05 budget at the June 23, 2004 Board meeting.
Director Joy Neugebauer opposed the motion.
b. FAHR04-11 MOVED, SECONDED AND DULY APPROVED TO: (1) Appoint Moss,
Levy& Hartzheim as the District's contract internal auditor for fiscal year
2003/04, at a maximum fee of$19,780, with an option of providing
contract internal auditing services for fiscal years 2004/05 and 2005/06
upon recommendation from staff and approval by the FAHR Committee;
and,
(2) Direct Moss, Levy& Hartzheim to perform specific internal auditing
assignments as the FAHR Committee deems necessary.
Mike White explained that the internal auditing firm has been hired at the
request of the FAHR Committee to perform an internal audit of various
issues for fiscal year 2003-04. They will be meeting with staff to begin a
preliminary analysis but they will be reporting directly to the FAHR
Committee, not staff.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 5
�1 February 11, 2004
A `Report of the Contract Internal Auditing Team' will be added to the
FAHR agenda as a monthly report.
(12) INFORMATIONAL PRESENTATIONS
b. FAHR04-13 Preliminary 2004-05 Sewer Service User Fee Estimates
Gary Streed reported that staff believes that the 15 percent increase in
user fees for the next year is necessary. He described the consolidated
cash flow projections. Additional presentations will be made later in the
budget process.
(14) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
Director Steve Anderson announced that there will be a GWRS groundbreaking ceremony at the
Anaheim Pond on Thursday, February 19, between 12 and 1:30 p.m.
Director Joy Neugebauer asked that the February 18 New Directors Workshop be taped for those
who cannot attend.
(15) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
There were none.
(16) CONSIDERATION OF UPCOMING MEETINGS
The next FAHR Committee meeting is scheduled for March 10, 2004 at 5 p.m.
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 6:57 p.m.
Submitted by:
JKaJ Tappan
AQOg FAHR Committee Secretary
H:\dept\agenda\FAHR\FAHR2004\0204\021104 FAHR Minutes.doc
FAH R COMMITTEE Meeting Date To Bd.of Dir.
02/11/04 02/25/04
AGENDA REPORT Item Number Item Number
FAHR 04-01 14(b)
Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Michael White, Controller
SUBJECT: TREASURER'S REPORT FOR THE MONTH OF JANUARY 2004
GENERAL MANAGER'S RECOMMENDATION
Receive and file Treasurer's Report for the month of January 2004.
SUMMARY
Pacific Investment Management Co. (PIMCO), serves as the District's professional
external money manager, and Mellon Trust serves as the District's third-party custodian
bank for the investment program. Some funds are also deposited in the State of
California Local Agency Investment Fund for liquidity.
The District's Investment Policy, adopted by the Board, includes reporting requirements
as listed down the left most column of the attached PIMCO Monthly Report for the
"Liquid Operating Monies" and for the "Long-Term Operating Monies" portfolios. The
District's external money manager is operating in compliance with the requirements of
the Investment Policy. The portfolio contains no reverse repurchase agreements.
As shown on page 2 of the attached PIMCO's Performance Monitoring and Reporting
Report for the Long-Term Operating Monies, there is a investment policy compliance
exception pertaining to the holding of two securities within PIMCO's Long-Term
Operating Monies Portfolio that had an acceptable rating at the time of purchase but
has since fallen below the minimum rating allowed by the investment policy. The
District's investment policy requires a minimum rating of A3 by Moody's or A- by S&P,
with at least a BBB rating in the event of a split rating, at the time of purchase. The first
of these rating exceptions pertains to the holding of a United Airlines (UAL) Asset
Backed Security with a par value of $1.6 million, representing 0.41 percent of the
portfolio holdings, whose rating from Moody's has fallen several times, from A3 to BA1,
then to BA3, B3, B, and finally to CA. Likewise, the rating from Standard & Poor's has
also fallen several times, first from A- to BBB, then to BB, then to B+, B-, and finally to
CCC+. Although these ratings are less than what is required at the time of purchase,
PIMCO believes, based on the financial strength of UAL and the underlying collateral of
the security, that the District would suffer an unwarranted loss if the security was sold at
this time.
The second ratings exception pertains to the holding of a $1 million par of the Philip
Morris-Altria corporate bond with an April 2004 maturity, representing 0.26 percent of
the portfolio holdings, whose rating with Moody's has fallen from A2 to Baal and then to
H:Wept\fin\220\white\FAHR\Monthly Treasurer Report\2003-04\TREASRPT021104.doc
Page 1
Baa2, and with S&P from A- to BBB. During the month of November, PIMCO sold $4
million par of this original $5 million holding at a price of $101 .9 for a realized loss of "
$134,400. PIMCO believes based on the underlying assets of the parent company, that '
the District would suffer a severe unwarranted loss if the remaining $1 million holdings
were sold at this time.
The District's investment policy does not require any action because of "credit watch"
notices or the decline in credit standing. However, PIMCO will continue to monitor the
credit for these two securities very closely.
Historical cost and current market values are shown as estimated by both PIMCO and
Mellon Trust. The District's portfolios are priced to market ("mark-to-market") as of the
last day of each reporting period. The slight differences in value are related to minor
variations in pricing assumptions by the valuation sources at the estimate date.
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
Not applicable (information item)
ADDITIONAL INFORMATION
Schedules are attached summarizing the detail for both the short-term and long-term
investment portfolios for the reporting period. In addition, a consolidated report of
posted investment portfolio transactions for the month is attached. The attached yield
analysis report is presented as a monitoring and reporting enhancement. In this report,
yield calculations based on book values and market values are shown for individual
holdings, as well as for each portfolio. Mellon Trust, the District's custodian bank, is the
source for these reports. Transactions that were pending settlement at month end may
not be reflected. Also provided is a summary of monthly investment balances and
transactions within the State of California Local Agency Investment Fund (LAIF).
The remaining $88.5 million proceeds from the 2003 COP debt issuance available for
future capital improvements is being managed and invested by PIMCO with Union Bank
of California serving as the Trustee. When combined with the reserves of the existing
outstanding debt issues, total debt service reserves with trustees totals $150,702,000.
These reports accurately reflect all District investments and are in compliance with
California Government Code Section 53646 and the District's Investment Policy.
Sufficient liquidity and anticipated revenues are available to meet budgeted
expenditures for the next six months.
The table on the following page details the book balances of the District's investment
accounts at month-end. A graphical representation of month-end balances is shown on
the attached bar chart.
H:ldept\finQ201whitekFAHRtMonthiy Treasurer Repori\2003-04\TREASRPT021104.doc
Page 2
tl
y` Book Balances Estimated
Investment Accounts January 31,2004 Yield(%)
State of Calif. LAIF $ 21,228,614 1.53
Union Bank Checking Account 4,961,734 0.93 (1)
PIMCO—Short-term Portfolio 91,135,220 1.35
PIMCO-Long-term Portfolio 384,554,187 2.51
Petty Cash 5.000 N/A
TOTAL $501,884,755 2.24
Debt Service Reserves w/Trustees $150.7 ,342 2.08
(1) This is the annualized yield for the month of December. The January annualized rate was
not available as of the date of this report.
ATTACHMENTS
1. Graph of Monthly Investment Balances by Type — Last Six Months
2. Investment Transactions and Balances in the State Local Agency Investment Fund
3. PIMCO Monthly Investment Recap & Yield Analysis Report
4. PIMCO Performance Monitoring Report— Liquid Operating Monies
5. PIMCO Performance Monitoring Report— Long-Term Operating Monies
6. Mellon Trust Asset Summary by Asset Type with Sectors — Liquid Operating Monies
7. Mellon Trust Asset Summary by Asset Type with Sectors — L-T Operating Monies
8. Mellon Trust Yield Analysis Report
9. Mellon Trust Asset Detail — Consolidated
10.Mellon Trust Transaction Detail - Consolidated
MW:IC
H:1dep11fin12201white\FAHRIMonthly Treasurer Reportl2003-045TREASRPT021104.doc
Page 3
Prepared by Finance, 2/10/2004, 3:30 PM
Monthly Investment Balances by Type-
Last Six Months
$700,000,000 -....................................................................................................
$600,000,000 — - —
$500,000,000 --
$400,000,000 -
$300,000,000
$200,000,000
$100,000,000
$0 _ .......
August September October November December January
2003 2003 2003 2003 2003 2004
®PIMCO- Long-term ®PIMCO-Short-term M COP Debt Reserves
®LAIF ❑Bank Accts 0 Petty Cash
H:\dept\fin\EXCEL.dta\220\white\Treasury Management\Monthly Investment Balances Graph.xls
a
Orange County Sanitation District
Investment Transactions and Balances in the
State of California Local Agency Investment Fund
January 31, 2004
Par Value Book Value Market Value Rate Yield
Balance
January 1,2004 $34,100,246 $34,100,246 $34,100,246 1.528 1.528
Deposits:
1/21/2004 2,500,000 2,500,000 2,500,000 1.528 1.528
1/22/2004 9,800,000 9,800,000 9,800,000 1.528 1.528
Total Deposits 12,300,000 12,300,000 12,300,000 1.528 1.528
Quarterly
Interest
Distribution 128,368 128,368 128,368 1.528 1.528
Withdrawals:
1/2/2004 (3,600,000) (3,600,000) (3,600,000) 1.528 1.528
1/8/2004 (1,800,000) (1,800,000) (1,800,000) 1.528 1.528
1/15/2004 (5,400,000) (5,400,000) (5,400,000) 1.528 1.528
1/16/2004 (1,600,000) (1,600,000) (1,600,000) 1.528 1.528
1/30/2004 (12,900,000) (12,900,000) (12,900,000) 1.528 1.528
Total Withdrawls (25,300,000) (25,300,000) (25,300,000) 1.528 1.528
Balance
January 31,2004 $21,228,614 $21,228,614 $21,228,614 1.528 1.528
Y
P I M C O
February 9,2004
Mr.Mike White,CPA
Controller
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley,CA 92708-7018
Dear Mike:
The following is a description of events in the bond markets during the month of January in
addition to an analysis of the strategies undertaken in the Orange County Sanitation District's
Long-Term, Liquid, and COP Proceeds portfolios over the period. Also included is a section on
our outlook and preferred strategies to be pursued in your portfolios during the coming months.
Bond Market Recap:
Core bond sectors posted positive returns in January as data reassured investors that modest gross
domestic product growth continued without inflationary pressures. U.S. Treasuries returned
0.85% for the month, but these gains would have been greater had it not been for a late month
sell-off following the FOMC meeting. Yields on the benchmark 10-year Treasury opened the
month at 4.25%, rallied to a low of 3.92% on January 23rd then retreated, finishing the month at
4.14%. Treasury Inflation Protected Securities, or TIPS, outperformed nominal Treasuries; the
Lehman Brothers U.S. TIPS index returned 1.15% in January. Mortgage-backed securities
returned 0.63%, outpacing Treasuries by 17 basis points after adjusting for duration. The credit
sector also performed well as the Lehman Credit Index returned 1.01%, for a duration-adjusted
excess return of 15 basis points. Within the sector, lower quality investment grade corporates
outperformed, with Baa-rated bonds beating like-duration Treasuries by 18 basis points, whereas
Aaa excess returns were 8 basis points.
Although economic data continued to reveal tepid inflation and employment growth, a slight
change in wording by the Fed erased much of the gains in Treasuries during January. On January
28th, the Federal Open Market Committee surprised investors by altering its "considerable
period" phrase, electing instead to say that the Fed "can be patient in removing its policy
accommodation." This change in language initiated a Treasury sell-off that appeared more
reactionary than based on fundamentals, as economic releases during the month continued to
reveal low price growth and slack in labor markets. The Consumer Price Index rose only 0.2%in
December, in line with benign expectations. Core inflation, which excludes volatile food and
energy prices, rose 0.1% and remained at 1.1% annualized. This is the lowest rate of core
a
Mr. Mike White, CPA February 9, 2004
Orange County Sanitation District Page 2
inflation in 38 years. The Bureau of Labor Statistics' monthly Employment Situation Report
indicated that net payroll jobs increased by a paltry 1,000, well below consensus expectations of
127,000. Although the unemployment rate fell 0.2% to 5.7% — a seemingly positive sign — this
decline was driven by frustrated job seekers who stopped looking for work. Nevertheless,
economic expansion continued at a respectable rate. GDP growth for the fourth quarter of 2003
came in at 4.0%, according to the Bureau of Economic Analysis. However, this too was below
consensus estimates of 4.4%.
Treasury yield changes during the month of January are summarized as follows:
■ 3-month bills: -1 basis point to 0.91%
■ 6-month bills: -2 basis points to 0.99%
■ 2-year notes: unchanged at 1.82%
■ 5-year notes: -10 basis points to 3.14%
■ 10-year notes: -11 basis points to 4.13%
■ 30-year notes: -11 basis points to 4.96%
Performance Attribution:
Long-Term Portfolio
The Long-Term portfolio that PIMCO manages on behalf of Orange County Sanitation District
generated a total return of 0.42 percent for the month of January, outperforming the Merrill Lynch
1-5 year Government Corporate Index by 5 basis points. The following points summarize returns
for the period ended January 31:
• The Long-Term portfolio outperformed the benchmark by 5 basis points for the month.
• For the twelve-month period,the Long-Term portfolio returned 3.57%, underperforming
the benchmark by 7 basis points.
• Portfolio duration,below the index, was negative for monthly performance as rates fell
across maturities.
• Broader-than-index yield curve positioning was largely neutral for performance as rates
on intermediate maturities fell in conjunction with longer maturities.
• An underweight exposure to Treasuries was positive, as the sector lagged higher yielding
sectors during the month. Substituting TIPS for nominal Treasuries was positive for
performance, as TIPs outperformed nominals.
• Exposure to mortgage-backed securities was positive for relative performance as the
sector outperformed Treasuries on a duration-adjusted basis.
• Corporate issues were positive for performance as the sector continued to perform
strongly relative to other bond market sectors;however, an underweight exposure
relative to the benchmark was negative.
V Mr. Mike White, CPA February 9, 2004
Orange County Sanitation District Page 3
Liquid Portfolio
The Liquid portfolio that PIMCO manages on behalf of Orange County Sanitation District
generated a total return of 0.09 percent during the month of January, performing in line with the
3-month Treasury Bill Index for the month. The following points summarize returns for the
period ending January 31:
• The Liquid portfolio performed in line with the benchmark for the month.
• For the twelve-month period,the Liquid portfolio returned 1.20%, outperforming the
benchmark by 16 basis points.
• Use of higher yielding securities such as commercial paper and short-term notes
contributed to performance.
"2003 COP Proceeds—Future Construction"Portfolio
The COP Proceeds portfolio that PIMCO manages on behalf of Orange County Sanitation District
generated a total return of 0.09 percent during the month of January, performing in line with the
3-month Treasury Bill Index. The following points summarize returns for the period ending
January 31:
• The Liquid portfolio performed in line with the benchmark for the month.
• Use of higher yielding securities such as commercial paper and short-term notes
contributed to performance.
Outlook and Strategy:
The recovery in the global economy will be sustained in 2004, with China joining the U.S. as an
engine of growth. Further into the year, U.S. interest rates could rise up to 100 basis points for
short maturities but less for longer maturities as markets anticipate tightening by the Federal
Reserve. The timing of the Fed move, late in 2004 or early 2005, will depend on how quickly the
economy narrows its output gap, measured by the slack in labor markets. This unused capacity,
combined with enhanced labor productivity, will keep inflation tame. Key elements of PIMCO's
forecast are:
■ In the U.S.economy,positive forces will outweigh negatives. The hoped for rebound in business investment is
now a reality. Massive fiscal stimulus will also provide support,as will spending to rebuild lean inventories.
■ On the negative side, effects of large tax cuts will peak in 2004 and become a fiscal drag by 2005, while
benefits of the boom in mortgage refinancing have already begun to dissipate. Employment growth will be
muted because of productivity gains and outsourcing to low cost labor markets such as India and China.
■ China's contribution to growth is tied to its currency peg with the U.S.dollar. The peg forces China to follow
the Fed's reflationary monetary policy, fueling a boom in investment for domestic infrastructure. This
investment will promote growth in Asia and elsewhere as China imports commodities and components to build
its infrastructure. While China will eventually succumb to pressure and revalue its currency, its currency peg
will be sustained for the next year because the peg serves Chinese and U.S. interests. China will retain
Mr. Mike White, CPA February 9, 2004
Orange County Sanitation District Page 4
competitive pricing in dollar terms for its exports. It will use the dollars it earns to help finance the U.S.trade
deficit,thereby stemming a freefall in the dollar and mitigating the rise in U.S.interest rates.
■ Japan is recovering without fiscal stimulus for the first time in a decade as healthier Japanese companies
integrate with China. Japan's fiscal policy is now focused on reform of the banking sector. Euroland will be
the laggard in 2004,but the recent collapse of the Growth and Stability Pact opens the door for needed fiscal
stimulus that will offset a stronger euro.
The bond market in 2004 will be challenging,with upward pressure on rates and full valuations in
Treasuries, most corporates and mortgages. Active managers with the resources and skill to
exploit a broad spectrum of strategies can add value,however, especially with a defensive posture
focused on safe yield. We will continue to hold mortgages to benefit from their long-term
structural advantages and will manage coupon selection to add value. We will limit exposure to
corporate bonds given their rich valuations and will focus on more attractively priced issues. We
plan to target duration near-to-below index to protect against the risk of upward pressure on rates.
A broader-than-index yield curve maturity mix will be retained to enhance yield. The Fed will
anchor the short end of the yield curve for most of 2004, keeping the curve steep and allowing
investors focused on intermediate maturities to reap gains by"rolling down"the curve.
We look forward to discussing these and other topics with you in the near future.
Best regards,Christine Telish, CFA John M. Miller, CFA
Vice President Senior Vice President
v
Orange County Sanitation District
for the month ending January 31,2004
Total Return Account-203
With Accrued Interest Without Accrued Interest
Market Value 388,447.622 384,758,725
Book Value 382,757,718 379.068.821
Yield to Maturity 2.51 2.53
Short Term Account-603
With Accrued Interest Without Accrued Interest
Market Value 91,465,143 91,175,780
Book Value 91.745,277 91,455,914
Yield to Maturity 1.35 1.36
2003 COP Proceeds-Future Construction-2203
With Accrued Interest Without Accrued Interest
Market Value 88,718,610 88,456,900
Book Value 88,850,299 88,588,589
Yield to Maturity 1.34 1.34
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 January 2004)
Page I of 1
Liquid Operating Monies(603)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIMCO $91,465,143
• Mellon $91,446,306
Historical Cost:
• PIMCO $91,745,277
• Mellon $91,768,000
15.1.2 MODIFIED DURATION Of Portfolio: 0.10
Of Index: 0.20
15.1.3 1%INTEREST RATE CHANGE Dollar Impact(gain/loss)of 1%Change: $91 465
15.1.4 REVERSE REPOS %of Portfolio in Reverse Repos:
see attached schedule 0%
15.1.5 PORTFOLIO MATURITY %of Portfolio Maturing within 90 days: 86%
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality: "AAA"
15.1.7 SECURITIES BELOW "A" RATING %of Portfolio Below"A": 0%
15.1.8 INVESTMENT POLICY COMPLIANCE "In Compliance" Yes
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%)by Portfolio Index
Period:
1 Month: 0.09 0.08
3 Months: 0.27 0.24
12 Months: 1.20 1.04
Fiscal Year-to-Date: 0.63 0.56
Commentary
• The Liquid portfolio outperformed the benchmark by 1 basis point for the mooch,and by 7 basis points fiscal year-to-date.
• PIMCO's emphasis on higher yielding securities such as commercial paper and short-term notes contributed to performance.
J1Adep1\nnUZ01wh1te\Treasary MgmtMQ0800-04-01APT.doe
a ^
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 January 2004)
Page 1 of 3
Lang-Term Operating Monies(203)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
• PIMCO $388,447,622
• Mellon $388,318,082
Historical Cost:
• PIMCO $382,757,718
• Mellon $383,601,828
15.1.2 MODIFIED DURATION Of Portfolio: 2.11
Of Index: 2.43
15.1.3 1% INTEREST RATE CHANGE Dollar Impact(gain/loss)of 1%Change: $8,196,245
15.1.4 REVERSE REPOS %of Portfolio in Reverse Repos:
see attached schedule 0%
15.1.5 PORTFOLIO MATURITY %of Portfolio Maturing within 90 days: 24%
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality: AAA
15.1.7 SECURITIES BELOW "A" RATING %of Portfolio Below"A": 0%
15.1.8 INVESTMENT POLICY COMPLIANCE "In Compliance" No*
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%)by Portfolio Index
Period:
1 Month: 0.42 0.37
3 Months: 1.14 1.13
12 Months: 3.57 3.64
Fiscal Year-to-Date: 0.99 0.86
• The Long-Term portfolio outperformed the benchmark by 5 basis points for the month,and by 13 basis points fiscal year-to-date.
• Portfolio duration,below the index,was negative for monthly performance as rates fell across maturities.
• Broader-than-index yield curve positioning was largely neutral for performance as rates on intermediate maturities fell in conjunction with longer maturities.
• An underweight exposure to Treasuries was positive,as the sector lagged higher yielding sectors during the month. Substituting TIPS for nominal Treasuries was positive for performance,as TIPS outperformed
nominals.
• Exposure to mortgage-backed securities was positive for relative performance as the sector outperformed Treasuries on a duration-adjusted basis.
• Corporate issues were positive for performance as the sector continued to pert brm strongly relative to other bond market sectors;however,an underweight exposure relative to the benchmark was negative.
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 January 2004)
Page 2 of 3
*Compliance Issues:
$1,600,000 par of United Airlines(UAL)Pass-Through 2001-1-C(Enhanced Equipment Trust Certificate(EETC)-909317BC2),6.831%coupon,9/l/2008
maturity,representing 0.41%of the portfolio holdings on a par basis was purchased on 8/10/2001;and subsequently downgraded by Moody's from A3 to BA 1 (on
9/18/2001)and S&P from A-to BBB (on 9/20/2001). The security was further downgraded by Moody's from BA to BA3 (on 12/21/2001)and by S&P from BBB to BB
(on 6/28/02). Following news of the possible bankruptcy filing,the:security was further downgraded in August(133 Moody's,B+by S&P). On November 29,2002,S&P
further downgraded this issue to B,and shortly thereafter on December 9,2002,downgraded the issue one notch further to B-. On August 7,2003, S&P downgraded the
issue to CCC+,while Moody's followed suit on August 28,2003 with a downgrade to CA. The District's investment policy requires a minimum rating of A3 by Moody's
or A-by S&P,with at least a BBB rating in the event of a split.
During the fourth quarter of 2003,UAL posted a$251 million loss which was about 11 percent lower than consensus. UAL did not provide specific guidance for the first quarter,
but the company stated that its forward bookings are up year-over-year,primarily in international areas where the Iraqi war depressed volumes last year. The company also
indicated that it remains on track to achieve another$1.4 billion of cost savings in 2004 on top of the$1.2 billion achieved during 2003. Moreover UAL's new discount airline,
Ted,begins flying on February 12'h. UAL does appear to be making progress with its cost structure,although it remains in the middle of the pack on key cost and yield measures
compared to its mainline peers. The company also announced that JP Morgan and Citibank have each committed equally to a$400 million exit financing(not guaranteed by the US
government),which requires an$800 million loan approved by the Air Transportation Stabilization Board(ATSB). The latter would have a guaranteed from the US government.
The successful approval of an ATSB loan would be an important step in UAL's attempt to exit from bankruptcy this year.
PIMCO continues to negotiate with UAL on the District's holdings and currently lead an ad hoc committee. This has been an extremely complicated effort due to the complex
nature of UAL's bankruptcy. These negotiations have required PIMCO's analysts access to non-public information and they are now at a point in these workout negotiations where
restructuring options are being discussed. Details on the options are non-public information and therefore sharing them results in parties becoming restricted. In light of this
extremely complicated bankruptcy, PIMCO continues to strive to act in the most prudent manner to obtain maximum recovery.
$1,000,000 par of Philip Morris-Altria NT(cusip 718154CH8), 4/l/2004 maturity,representing 0.26%of the portfolio holdings on a par basis was purchased on 8/6/2001 at a
price of 105.26. This security was subsequently downgraded by Moody's from A2 to Baal on 4/01/2003,and then from Baal to Baal on 4/23/03. The security was downgraded
by S&P from A-to BBB on 4/10/2003. The District's investment policy requires a minimum rating of A3 by Moody's or A-by S&P,with at least a BBB rating in the event of a
split. In November,PIMCO sold$4,000,000 par(of the$5,000,00-0 original holding)at a price of 101.9 for a realized loss of$134,400.
The Philip Morris USA downgrade activity was a result of a negative court judgment and its associated bonding requirement. In the Miles case,named after the initial plaintiff in
the class-action lawsuit,an Illinois court fined Philip Morris$10.3 billion for allegedly deceiving smokers into thinking that"light"cigarettes were safer than regular cigarettes.
The company,now a subsidiary of Altria,has said that the lawsuit was flawed and that it planned to appeal the ruling and the class certification order that preceded it.
Prior to the judgment,PIMCO's analysis of Altria(the holding company and issuer of the debt)shows investment grade credit metrics even excluding in its entirety Philip Morris
USA(the domestic tobacco subsidiary and the entity subject to all of the legal suits). The analysis was based on the assumption that the horizon of any final verdict would be years
in the future,while the company would generated significant cash flow in the interim.
Altria announced that fourth-quarter profits jumped 18 percent as results improved at its domestic tobacco unit and international sales were buoyed by the weaker dollar. The U.S.
cigarette industry has been hit by higher state excise taxes,competition from cheaper brands and counterfeit products. Altria has responded to this situation by increasing spending
on promotions and introducing new products to maintain consumer interest in its brands. Philip Morris USA's fourth-quarter shipment volume rose 6.2 percent to 46.3 billion
cigarettes,due mainly to the timing of promotional shipments,Altria said.
Q '
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ended 31 January 2004)
Page 3 of 3
PIMCO believes Altria is unlikely to sacrifice good subsidiaries to fund the bad one,which would create a bad precedent for future court cases. PIMCO continues to hold their
positions at the holding company(Altria)level,but have suspended any additional purchases until greater clarity emerges on the likelihood of various outcomes.
Split Rated Securities Still In Compliance:
The District's investment policy requires a minimum rating of A3 by Moody's or A-by S&P,with at least a BBB in the event of a split rating.
•$3,500,000 par of Ford Motor Credit securities($2.5 million represented by cusip 345397SJ3 maturing 7/16/04 and$1 million represented by cusip 345397GV9 maturing
5/15/05),representing 0.90%of the portfolio holdings on a par basis. The securities were downgraded on 10/16/2001 by S&P from A to BBB+,then to BBB on 10/25/02,and then
to BBB-on 11/13/03. Moody's downgraded the securities on 1/16/02 from A2 to A3.
•$3,000,000 par of General Motors Acceptance Corp securities(cusip 370425SD3)maturing on August 28,2007,representing 0.77%of the portfolio holdings on a par basis. The
securities were downgraded on 10/16/2001 by S&P from A to BBS+,and a further downgrade to BBB occurring on 10/16/2002. The securities now carry a Moody's rating of A3
after a further downgrade from A2 on 6/14/03.
•$1,750,000 par of Virginia Electric Power NT securities(cusip 927804EN0),maturing in 2006,represents 0.45%of the portfolio holdings on a par basis. The security was
downgraded on 10/21/2002 by S&P from A-to BBB+,but continues to carry a Moody's rating of A3.
H.ideprifW 2101whitel Treasury MgmAL-T0800-04-01.RPT.doc
Asset Summary Report ID: GL8251
Base Currency: USD
/ Mellon by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LIQUID OPER-PINCO-OCSF07511102 1 31 2004 Status: FINAL
Net Unrealiked
Cost Market Value % of Gain/Loss
Description Shares Par Base Base Total Base
CASH&CASH EQUIVALENTS
U.S. DOLLAR
INTEREST 311,086.46 311,086.46 0.34% 0.00
BSDT RESERVE DEPOSIT ACCOUNTS 1,000.000 1,000.00 1,000.00 0.00% 0.00
COMMERCIAL PAPER- DISCOUNT 7,000,000.000 6,991,545.14 6,991,545.14 7.65% 0.00
FED HM LOAN BNK-LESS THAN IYR 16,200,000.000 16,154,527.66 16,154,527.66 17.67% 0.00
FEDERAL HOME LOAN MORTGAGE-LESS THAN I YR 9,800,000.000 9,763,665.83 9,763,665.83 10.68% 0.00
FNMA ISSUES-LESS THAN 1 YR 13,200,000.000 13,168,747.50 13,168,747.50 14.40% 0.00
MUTUAL FUNDS 189,640.400 189,640.40 189,640.40 0.21% 0.00
REPURCHASE AGREEMENTS 9,500,000.000 9,500,000.00 9,500,000.00 10.39% 0.00
TREASURY BILLS-LESS THAN IYR 23,100,000.000 23,026,338.99 23,026,338.99 25.18% 0.00
U.S. DOLLAR 78,990,640.400 79,106,551.98 79,106,551.98 86.51% 0.00
CASH&CASH EQUIVALENTS 78,990,640.400 79,106,551.98 79,106,551.98 86.51% 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
BANKING&FINANCE 6,302,000.000 6,508,328.58 6,377,908.77 6.97% -130,419.81
U.S.AGENCIES 5,300,000.000 5,476,073.00 5,311,845.38 5.81% -164,227.62
UTILITY-TELEPHONE 650,000.000 677,046.50 650,000.00 0.71% -27,046.50
U.S. DOLLAR 12,252,000.000 12,661,448.08 12,339,754.15 13.49% -321,693.93
FIXED INCOME SECURITIES 12,252,000.000 12,661,448.08 12,339,754.15 13.49% -321,693.93
TOTAL ASSETS-BASE: 91,242,640.400 91,768,000.06 91,446,306.13 100.00% -321,693.93
21612004 11:48:37AM PST 1 Workbench
a
Report M: GL82S1
Asset Summary Base Currency: USD
,� Mellon by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TERM OPER-PIMCO-OCSY07522202 1 31 2004 Status: FINAL
Net Unrealized
Cost Market Value % of Gain/Loss
Description Shares Par Base Base Total Base
CASH 85 CASH EQUIVALENTS
U.S. DOLLAR
PENDING TRADES -3,069,106.70 -3,069,106.70 -0.79% 0.00
INTEREST 3,763,894.99 3,763,894.99 0.97% 0.00
COMMERCIAL PAPER- DISCOUNT 2,700,000.000 2,690,984.00 2,690,984.00 0.69% 0.00
FED HM LOAN BNK-LESS THAN IYR 12,700,000.000 12,668,336.26 12,668,336.26 3.26% 0.00
FEDERAL HOME LOAN MORTGAGE-LESS THAN 1 YR 22,200,000.000 22,136,333.84 22,136,333.84 5.70% 0.00
FNMA ISSUES- LESS THAN IYR 17,500,000.000 17,447,688.03 17,447,688.03 4.49% 0.00
MUTUAL FUNDS 132,553.120 132,553.12 132,553.12 0.03% 0.00
TREASURY BILLS- LESS THAN IYR 37,900,000.000 37,706,336.65 37,706,336.65 9.71% 0.00
U.S. DOLLAR 93,132,553.120 93,477,020.19 93,477,020.19 24.07% 0.00
CASH &CASH EQUIVALENTS 93,132,S53.120 93,477,020.19 93,477,020.19 24.07% 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
ABS-AIRPLANE RECEIVABLES 1,600,000.000 1,600,000.00 289,680.00 0.07% -1,310,320.00
ABS-HOME EQUITY 984,505.700 984,505.70 983,275.07 0.25% -1,230.63
BANKING&FINANCE 29,335,000.000 30,475,793.00 31,160,142.05 8.02% 684,349.05
COLLATERALIZED MORTGAGE OBLIGATION COMM/1 2,425,788.580 2,425,788.58 2,596,078.94 0.67% 170,290.36
FHLMC MULTICLASS 1,061,097.190 1,062,227.65 1,094,129.15 0.28% 31,901.50
FHLMC POOLS 157,768.840 157,840.92 161,769.69 0.04% 3,928.77
FNMA POOLS 44,116,762.340 45,182,906.10 45,486,254.40 11.71% 303,348.30
GNMA MULTI FAMILY POOLS 3,210,992.030 3,195,079.20 3,260,248.80 0,84% 65,169.60
GNMA SINGLE FAMILY POOLS 8,671,218.870 8,798,615.28 9,141,278.37 2.35% 342,663.09
INDUSTRIAL 8,000,000.000 8,248,380.00 8,307,150.00 2.14% 58,770.00
INFLATION INDEXED SECURITIES 34,357,230.000 34,374,177.40 38,219,758.12 9.84% 3,845,580.72
INSURANCE 1,600,000.000 1,594,032.00 1,719,248.00 0.44% 125,216.00
PVT PLACEMENTS- MORE THN 1YR 752,000.000 826,199.84 826,199.84 0.21% 0.00
U.S. AGENCIES 41,126,983.110 42,203,755.32 43,746,753.68 11.27% 1,542,998.36
U.S. GOVERNMENTS 92,597,276.280 100,770,646.50 99,360,295.72 25.59% -1,410,350.78
UTILITY-ELECTRIC 4,750,000.000 4,694,370.00 4,991,460.00 1.29% 297,090.00
UTILITY-TELEPHONE 3,000,000.000 3,530,490.00 3,497,340.00 0.90% -33,150.00
U.S.DOLLAR 277,746,622.940 290,124,807.49 294,841,061.83 75.93% 4,716,254.34
21612004 11:51:32AM PST 1 Workbench
Report ID: GL8251
Asset Summary Base Currency: USD
Mellon by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TERM OPER-PIMCO-OCSF07522202 1 31 2004 Status: FINAL
Net Unrealized
Cost Market Value % of Gain/Loss
Description Shares Par Base Base Total Base.
FIXED INCOME SECURITIES 277,746,622.940 290,124,807.49 294,841,061.83 75.93% 4,716,254.34
TOTAL ASSETS -BASE: 370,879,176.060 383,601,827.68 388,318,082.02 100.00% 4,716,254.34
21612004 11:51:32AM PST 2 Workbench
a
YLDANAL YIELD ANALYSIS PAGE 1
OCSF07511102 2004/01/31 RUN DATE 02/06/04
DISTRICTt LIQUID OPERATING RUN TIME 10.22.29
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ^------ ------- ------- -------- ------------ ----------
CASH 6 CASH EQUIVALENTS
4,500,000.00 DU PONT DE NEMOUR DISC .000 .000 P-1 99.867 4,494,000.00 5.70
26354AC85 03/08/2004 4,494,000.00 4.93
5,200,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.86E 5,193,143.22 6.59
313384SR1 MAT 02/04/2004 A-1+ 5,193,143.22 5.70
1,000,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.688 996,879.16 1.26
313384SS9 A-1+ 996,879.16 1.09
600,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.614 597,681.67 .75
313384SWO MAT 02/09/2004 A-1+ 597,681.67 .66
2,000,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.732 1,994,641.11 2.53
313384TN9 MAT 02/25/2004 A-1+ 1,994,641.11 2.19
4,500,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.742 4,488,395.00 5.69
313384UE7 MAT 03/12/2004 A-1+ 4,489,395.00 4.92
900,000.00 FEDERAL HOME LN BKS CINS DISC .000 .000 P-1 99.462 895,162.50 1.13
313384UK3 MAT 03/17/2004 A-1+ 895,162.50 .98
2,000,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.431 1,988,625.00 2.52
313384XA2 MAT 05/19/2004 A-1+ 1,988,625.00 2.18
6,000,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.760 5,985,610.83 7.59
313396TPO MAT 02/26/2004 A-1+ 5,985,610.83 6.57
3,800,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.422 3,778,055.00 4.79
313396U24 HAT 03/31/2004 A-1+ 3,770,055.00 4.15
5,200,000.00 FEDERAL NATL MTG ASSN DISC NT .000 .000 P-1 99.871 5,193,305.00 6.59
313598SPI MAT 02/02/2004 A-1+ 5,193,305.00 5.70
6,000,000.00 FEDERAL NATL MTG ASSN DISC NT .000 .000 P-1 99.782 5,986,918.61 7.59
313588TF2 A-1+ 5,986,918.61 6.57
2,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.426 1,988,523.89 2.52
31358BXAB HAT 05/19/2004 A-1+ 1,988,523.89 2.18
2,500,000.00 GENERAL ELEC CAP DISC .000 .000 P-1 99.902 2,497,545.14 3.16
36959HBQ9 02/24/2004 2,497,545.14 2.74
YLDANAL YIELD ANALYSIS PAGE s 2
OCSF07511102 2004/01/31 RUN DATE s 02/06/04
DISTRICT: LIQUID OPERATING RUN TIME 10.22.29
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 9 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
1,200,000.00 U S TREASURY BILL .000 .000 P-1 99.516 1,194,191.67 1.51
912795PK1 DUE 02/12/2004 DD 08/14/2003 A-1+ 1,194,191.67 1.31
9,200,000.00 U S TREASURY BILL .000 .000 P-1 99.757 9,177,690.00 11.64
912795PPO 0.000% 03/11/2004 DD 09/11/03 A-1+ 9,177,690.00 10.07
6,500,000.00 U S TREASURY BILL .000 .000 P-1 99.785 6,486,041.25 8.23
912795PQB 0.000% 03/18/2004 DD 09/18/03 A-1+ 6,486,041.25 7.12
6,200,000.00 U S TREASURY BILL .000 .000 P-1 99.491 6,168,416.07 7.82
912795QA2 0.000% 05/27/2004 DD 11/28/03 A-1+ 6,168,416.07 6.77
9,500,000.00 FIRST BOSTON CORP REPO .000 .970 100.000 9,500,000.00 12.05
99415T115 00.970% 02/02/2004 DD 01/30/04 9,500,000.00 10.42
189,640.40 DREYFUS TREASURY CASH MGMT .000 .804 AAA 100.000 189,640.40 .24
996085247 AAA 189,640.40 .21
1,000.00 BSDT-LATE MONEY DEPOSIT ACCT .000 .100 100.000 1,000.00 .00
996087094 1,000.00 .00
-------- ------- ----------------- ---------
TOTAL CASH 6 CASH EQUIVALENTS ODO .035 78,795,465.52 100.00
78,795,465.52 86.46
FIXED INCOME SECURITIES
100,000.00 ASSOCIATES CORP NA MTN SR00043 .000 7.694 AA1 102.937 104,199.00 .83
045906BU7 7.920% 07/13/2004 DD 07/13/94 AA- 102,937.00 .11
1,000,000.00 ASSOCIATES CORP NORTH AMER .000 5.743 AA1 100.984 1,041,290.00 8.18
046003KA6 5.800% 04/20/2004 DD 04/20/99 AA- 1,009,840.00 1.11
500,000.00 BANK OF AMERICA CORP SR GBL NT ODO 6.496 AA2 101.984 518,385.00 4.13
066050CW3 6.625% 06/15/2004 DD 06/15/99 A+ 509,920.00 .56
650,000.00 BELL ATLANTIC-NEW JERSEY INC .000 5.875 AA3 100.000 677,046.50 5.26
077858AA6 5.875% 02/01/2004 DD 02/01/94 A+ 650,000.00 .71
1,100,000.00 FEDERAL HOME LN MTG CORP DEB .000 3.730 AAA 100.541 1,125,905.00 8.96
3134A4PH1 3.750% 04/15/2004 DD 04/15/02 AAA 1,105,953.20 1.21
r
b•
YLDANAL YIELD ANALYSIS PAGE s 3
OCSF07511102 2004/01/31 RUN DATE s 02/06/04
DISTRICT: LIQUID OPERATING RUN TIME s 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
4,200,000.00 FEDERAL NATL MTG ASSN DEBS .000 5.118 AAA 100.140 4,350,168.00 34.08
31359MEM1 5.125% 02/13/2004 DD 02/08/99 AAA 4,205,892.18 4.62
180,000.00 GENERAL ELEC CAP MTN #TR 00448 .000 7.143 AAA 101.500 183,801.60 1.48
36962GUR3 7.250% 05/03/2004 DD 05/01/00 AAA 182,700.00 .20
1,000,000.00 GENERAL ELEC CAP MTN 8TR 00545 .000 1.219 AAA 100.062 1,001,089.00 8.10
36962GYS7 VAR RT 05/20/2004 DD 05/20/02 AAA 1,000,620.00 1.10
1,000,000.00 LEHMAN BROS HLDGS INC .000 6.568 Al 100.875 1,045,590.00 8.17
524908BZ2 6.625% 04/01/2004 DD 03/26/99 A 1,008,750.00 1.11
250,000.00 NCNB TEX NATL BK DALLAS TEX NT .000 9.258 AA2 102.609 260,870.00 2.07
628857DJ0 9.500% 06/01/2004 DD 06/01/89 A+ 256,522.50 .28
627,000.00 NATIONSBANK CORP SR NTS .000 5.996 AA2 102.156 646,650.18 5.19
638585BJ7 6.125% 07/15/2004 DD 07/23/98 A+ 640,518.12 .70
520,000.00 NORWEST FINL INC NTS .000 7.133 AA1 100.937 531,538.80 4.25
669383DG3 7.200% 04/01/2004 DD 04/07/97 AA- 524,872.40 .58
1,000,000.00 US BANCORP MTN 1TR 00119 .000 5.921 AA3 101.328 1,046,310.00 0.21
91159HEY2 6.000% 05/15/2004 DD 05/10/99 A+ 1,013,280.00 1.11
125,000.00 WELLS FARGO 6 CO NEW NT .000 6.472 AA1 102.359 128,605.00 1.03
949746AA9 6.625% 07/15/2004 DD 07/28/99 AA- 127,948.75 .14
-------- ------- ----------------- ---------
TOTAL FIXED INCOME SECURITIES .000 5.193 12,661,448.08 100.00
12,339,754.15 13.54
-�------ ------- ----------------- ---------
TOTAL .000 .601 91,456,913.60 100.00
91,135,219.67 100.00
----------------- ---------
YLDANAL YIELD ANALYSIS PAGE 4
PCSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 10.22.29
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
CASH & CASH EQUIVALENTS
900,000.00 EUROPEAN INVEST DISC .000 .000 99.732 897,588.50 .96
29878RCF3 03/15/2004 897,588.50 .23
11,800,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.751 11,770,622.63 12.68
313384VPI MAT 04/14/2004 A-1+ 11,770,622.63 3.04
900,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.746 897,713.63 .96
313384WD7 MAT 04/28/2004 A-1+ 897,713.63 .23
4,700,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.661 4,684,085.28 5.04
313396SP9 MAT 02/02/2004 A-1+ 4,684,085.28 1.21
2,500,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.724 2,493,100.00 2.68
313396527 MAT 02/12/2004 A-1+ 2,493,100.00 .64
2,100,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.581 2,091,194.00 2.25
313396UQ4 MAT 03/22/2004 A-1+ 2,091,194.00 .54
10,000,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.753 9,975,277.78 10.75
313396VNO MAT 04/13/2004 A-1+ 9,975,277.78 2.57
1,700,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.747 1,695,702.78 1.82
313396VV2 MAT 04/20/2004 A-1+ 1,695,702.78 .44
1,200,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.748 1,196,974.00 1.29
313396WC3 MAT 04/27/2004 A-1+ 1,196,974.00 .31
400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.900 399,600.00 .43
313588SR7 MAT 02/04/2004 A-1+ 399,600.00 .10
2,400,000.00 FEDERAI, NATL MTG ASSN DISC NT .000 .000 P-1 99.715 2,393,155.61 2.57
313588TF2 A-1+ 2,393,155.61 .62
3,800,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.553 3,783,014.00 4.07
31358OTGO MAT 02/19/2004 A-1+ 3,783,014.00 .98
8,400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.745 8,378,580.00 9.03
313588TN5 MAT 02/25/2004 A-1+ 8,378,580.00 2.16
400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.727 398,908.00 .42
313588TV7 MAT 03/03/2004 A-1+ 398,908.00 .10
i
a
YLDANAL YIELD ANALYSIS PAGE 5
OCSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
1,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT 000 .000 P-1 99.735 997,350.00 1.07
313588UC7 MAT 03/10/2004 A-1+ 997,350.00 .26
1,100,000.00 FEDERAL NATL MTG ASSN DISC .000 .000 P-1 99.735 1,097,080.42 1.18
313588UK9 A-1+ 1,097,080.42 .28
1,800,000.00 GENERAL ELEC CAP DISC oDo .000 P-1 99.633 1,793,395.50 1.93
36959HD79 04/07/2004 1,793,395.50 .46
4,500,000.00 U S TREASURY BILL .000 .000 P-1 99.516 4,478,218.75 4.82
912795PK1 DUE 02/12/2004 DD 08/14/2003 A-1+ 4,478,218.75 1.16
17,000,000.00 UNITED STATES TREASURY BILL .000 .000 P-1 99.487 16,912,790.02 18.22
912795PV7 DUE 04/22/2004 DD 10/23/03 A-1+ 16,912,790.02 4.36
12,000,000.00 U S TREASURY BILL .000 .000 P-1 99.484 11,938,120.00 12.86
912795PWS 0.000% 04/29/2004 DD 10/30/03 A-1+ 11,938,120.00 3.08
4,400,OOO.00 U S TREASURY BILL .000 .000 P-1 99.482 4,377,207.88 4.71
912795PX3 0.000% 05/06/2004 DD 11/06/03 A-1+ 4,377,207.88 1.13
132,553.12 DREYFUS TREASURY CASH MGMT .000 .804 AAA 100.000 132,553.12 .14
996085247 AAA 132,553.12 .03
-------- ------- ----------------- ---------
TOTAL CASH 6 CASH EQUIVALENTS .000 .000 92,782,231.90 100.00
92,782,231.90 23.93
FIXED INCOME SECURITIES
752,000.00 AIG SUNAMERICA GLOBAL REG S .000 5.325 109.867 826,199.84 .28
U00907AA0 5.850% 08/01/2008 DD O8/08101 826,199.84 .21
3,000,000.00 COMMIT TO PUR FNMA SF MTG .000 5.780 AAA 103.805 3,097,695.31 1.05
OIF060626 6.000% 02/01/2034 DD 02/01/04 AAA 3,114,140.70 .80
1,500,000.00 CIT GROUP INC NEW SR NT .000 5.121 A2 107.406 1,527,135.00 .54
125581AD0 5.500% 11/30/2007 DD 12/02/02 A 1,611,090.00 .42
5,000,000.00 CITIGROUP INC GLOBAL SUB NT .000 5.272 AA2 106.687 5,333,600.00 1.80
172967BP5 5.625% 08/27/2012 DD 08/26/02 A+ 5,334,350.00 1.38
YLDANAL YIELD ANALYSIS PAGE 6
OCSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------ ------- ------- -------- ------------ ----------
78,846.78 FHLMC GROUP #G4-0353 .000 7.374 AAA 101.705 80,842.60 .02
3128DBMA2 7.500% 10/01/2004 DD 03/01/99 AAA 80,190.80 .02
7,500,000.00 FEDERAL HOME LN BR CONS BDS ODO 6.733 AAA 105.823 7,997,625.00 2.69
3133MAUN7 7.125% 02/15/2005 DD 02/08/00 AAA 7,936,746.75 2.05
78,922.06 FHLMC GROUP #78-6064 .000 3.277 AAA 103.366 76,998.32 .02
31348SWZ3 6.384% 01/01/2028 DD 12/01/97 AAA 81,578.89 .02
11,350,000.00 FEDERAL NATL MTG ASSN DEBS .000 4.911 AAA 106.897 11,521,271.50 4.11
31359MJX2 5.250% 06/15/2006 DD 06/22/01 AAA 12,132,758.43 3.13
832,616.95 FNMA POOL #0254510 .000 4.986 AAA 102.332 857,595.46 .28
31371KVB4 5.000% 11/01/2017 DD 10/01/02 AAA 852,033.83 .22
176,487.83 FNMA POOL #0254631 .000 4.880 AAA 102.457 181,782.47 .06
31371KY47 5.000% 02/01/2018 DD 01/01/03 AAA 180,824.19 .05
159,405.25 FNMA POOL #0254760 .000 4.879 AAA 102.488 164,187.40 .05
31371K5V9 5.000% 06/01/2018 DD 05/01/03 AAA 163,371.70 .04
69,607.32 FNMA POOL 10254866 .000 4.879 AAA 102.488 71,695.55 .02
31371LCB3 5.000% 09/01/2018 DD 08/01/03 AAA 71,339.35 .02
369,272.41 FNMA POOL #0254953 .000 4.879 AAA 102.488 374,003.72 .12
31371LE21 5.000% 11/01/2018 DD 10/01/03 AAA 378,460.94 .10
989,316.58 FNMA POOL #0254987 .000 4.986 AAA 102.336 1,001,992.19 .34
3137ILF46 5.000% 12/01/2018 DD 11/01/03 AAA 1,012,428.36 .26
204,495.94 FNMA POOL #0323980 .000 5.686 AAA 105.531 213,506.54 .07
31374T2MO 6.000% 04/01/2014 DD 09/01/99 AAA 215,807.12 .06
31,747.72 FNMA POOL #0357328 .000 4.985 AAA 102.358 32,700.15 .01
31376J4M8 5.000% 01/01/2018 DD 01/01/03 AAA 32,496.33 .01
1,596,486.62 FNMA POOL #0357430 .000 4.886 AAA • 102.332 1,604,334.60 .55
31376KA71 5.000% 09/01/2018 DD 09/01/03 AAA 1,623,483.96 .42
61,362.45 FNMA POOL #0456482 .000 5.686 AAA 105.531 64,066.23 .02
31381CCT2 6.000% 02/01/2014 DD 02/01/99 AAA 64,756.56 .02
175,430.91 FNMA POOL #0509649 .000 5.686 AAA 105.531 183,160.84 .06
313830EWO 6.000% 09/01/2014 DO 09/01/99 AAA 185,134.43 .05
:
YLDANAL YIELD ANALYSIS PAGE 7
OCSF07522202 2004/01/31 RUN DATE s 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ B TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
161,716.77 FNMA POOL #0535451 .000 5.692 AAA 105.406 168,842.42 .05
31384VZO8 6.000% 06/01/2015 DD 07/01/00 AAA 170,459.58 .04
3,498,227.4E FNMA POOL #0535672 .000 5.686 AAA 105.531 3,652,368.14 1.25
31384WCH1 6.000% 01/01/2016 DD 12/01/00 AAA 3,691,723.19 .95
1,148,263.09 FNMA POOL #0545296 .000 5.696 AAA 105.344 1,198,858.43 .41
31385HXZO 6.000% 11/01/2016 DD 10/01/01 AAA 1,209,623.40 .31
96,898.25 FNMA POOL 00545580 .000 5.696 AAA 105.344 101,167.82 .03
31385JCR7 6.000% 03/01/2017 DD 03/01/02 AAA 102,076.25 .03
172,129.85 FNMA POOL #0555101 .000 5.689 AAA 105.469 179,714.30 .06
31385WU23 6.000% 10/01/2017 DD 11/01/02 AAA 181,543.20 .05
776,267.57 FNMA POOL #0555285 .000 5.772 AAA 103.941 807,318.29 .27
31385W2S7 6.000% 03/01/2033 DD 02/01/03 AAA 806,863.46 .21
390,738.81 FNMA POOL 00555363 .000 4.886 AAA 102.332 392,160.97 .13
31385W5Y1 5.000% 04/01/2018 DD 03/01/03 AAA 389,617.75 .10
38,998.31 FNMA POOL #0555453 .000 4.890 AAA 102.457 39,497.98 .01
31385XBW6 5.000% 05/01/201B DD 04/01/03 AAA 39,956.51 .01
317,525.09 FNMA POOL #0555545 .000 4.886 AAA 102.332 327,050.85 .11
31385XES2 5.000% 06/01/2018 DD 05/O1/03 AAA 324,929.87 .08
1,102,850.90 FNMA POOL #0555621 .000 4.886 AAA 102.336 1,115,257.97 .38
31395XG60 5.000% 07/01/2019 DD 06/01/03 AAA 1,128,615.00 .29
64,663.42 FNMA POOL #0576386 .000 5.707 AAA 105.137 67,512.65 .02
31386XJ72 6.000% 05/01/2016 DD 05/01/01 AAA 67,985.19 .02
173,931.37 FNMA POOL #0576739 .000 5.696 AAA 105.344 181,595.22 .06
31386XV86 6.000% 04/01/2016 DD 04/01/01 AAA 103,225.83 .05
230,571.90 FNMA POOL #0590888 .000 5.682 AAA 105.594 240,731.47 .08
31387DJ91 6.000% 05/01/2016 DD 05/01/01 AAA 243,469.52 .06
184,126.55 FNMA POOL #0594002 .000 5.696 AAA 105.344 192,239.62 .06
31387T3K8 6.000% 07/01/2016 DD 07/01/01 AAA 193,965.81 .05
234,957.84 FNMA POOL #0597376 .000 5.696 AAA 105.344 245,310.67 .08
31387XT96 6.000% 09/01/2016 DD 08/01/01 AAA 247,513.40 .06
YLDANAL YIELD ANALYSIS PAGE 8
OCSF07522202 2004/01/31 RUN DATE : 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE B TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
157,839.89 FNMA POOL #0605259 .000 5.696 AAA 105.344 164,794.71 .05
31388HMG1 6.000% 09/01/2016 DO 09/01/01 AAA 166,274.46 .04
102,674.04 FNMA POOL #0608366 .000 5.696 AAA 105.344 107,198.12 .03
31388LZ78 6.000% 10/01/2016 DD 09/01/01 AAA 108,160.68 .03
169,865.39 FNMA POOL #0616734 .000 5.679 AAA 105.656 177,350.08 .06
31388WEF9 6.000% 12/01/2016 DD 12/01/01 AAA 179,473.40 .05
188,081.65 FNMA POOL #0630812 .000 5.706 AAA 105.159 196,369.00 .06
31389NYH2 6.000% 02/01/2017 DD 02/01/02 AAA 197,784.14 .05
826,323.45 FNMA POOL #0632376 .000 5.689 AAA 105.469 862,733.34 .29
31389QQ50 6.000% 07/01/2017 DD 07/01/02 AAA 871,513.01 .22
472,082.11 FNMA POOL #0653116 .000 5.689 AAA 105.469 492,883.23 .16
31390QSDB 6.000% 07/01/2017 DO 07/01/02 AAA 497,899.10 .13
188,315.61 FNMA POOL #0673200 .000 5.689 AAA 105.469 196,613.27 .06
31391P6R2 6.000% 08/01/2017 DD 11/01/02 AAA 198,614.12 .05
570,407.77 FNMA POOL #0681309 .000 4.886 AAA 102.332 587,520.00 .19
31391Y3S4 5.000% 02/01/2018 DD 02/01/03 AAA 583,709.85 .15
71,351.97 FNMA POOL #0681334 .000 4.886 AAA 102.332 73,492.52 .02
31391Y4T1 5.000% 02/01/2018 DD 01/01/03 AAA 73,015.92 .02
352,619.46 FNMA POOL #0684908 .000 4.880 AAA 102.457 357,137.40 .12
31400D3R1 5.000% 06/01/2018 DO 05/01/03 AAA 361,283.43 .09
204,992.46 FNMA POOL #0685200 .000 4.886 AAA 102.332 207,618.93 .07
31400EGH7 5.000% 03/01/2018 DD 03/01/03 AAA 209,772.95 .05
36,400.74 FNMA POOL #0695665 .000 4.886 AAA 102.332 37,492.77 .01
31400EW22 5.000% 02/01/2018 DD 02/01/03 AAA 37,249.62 .01
313,562.63 FNMA POOL #0686318 .000 4.886 AAA 102.332 322,969.51 .10
31400FPB7 5.000% 03/01/2019 DD 03/01/03 AAA 320,875.00 .08
123,443.25 FNMA POOL #0688739 .000 4.086 AAA 102.332 127,146.55 .04
31400JEL9 5.000% 06/01/2018 DD 06/01/03 AAA 126,321.98 .03
126,863.83 FNMA POOL #0689859 .000 4.879 AAA 102.488 128,499.27 .04
3140OKMGB 5.000% 05/01/2018 DD 05/01/03 AAA 130,020.56 .03
i
YLDANAL YIELD ANALYSIS PAGE 9
OCSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
------------------ ----------------------------- ------- ------- ------- -------- ------------ ----------
738,363.94 FNMA POOL 10693834 .000 4.886 AAA 102.332 760,514.86 .25
3140OPY74 5.000% 03/01/2018 DD 03/01/03 AAA 755,582.81 .19
269,944.76 FNMA POOL #0695852 .000 4.806 AAA 102.332 278,043.10 .09
31400SBVO 5.000% 05/01/2018 DD 05/01/03 AAA 276,239.95 .07
835,544.30 FNMA POOL 00695889 .000 4.886 AAA 102.332 860,610.62 .28
31400SC23 5.000% 05/01/2018 DD 05/01/03 AAA 855,029.44 .22
26,423.10 FNMA POOL 00697026 .000 4.886 AAA 102.332 27,215.81 .00
31400TLF2 5.000% 05/01/2018 DD 04/01/03 AAA 27,039.29 .01
91,476.22 FNMA POOL #0698939 .000 5.682 AAA 105.594 95,506.89 .03
31400VPY2 6.000% 09/01/2017 DD 03/01/03 AAA 96,593.17 .02
276,563.58 FNMA POOL #0702210 .000 4.886 AAA 102.336 284,860.49 .09
31401ADP9 5.000% 05/01/2018 DD 05/01/03 AAA 283,024.48 .07
148,219.75 FNMA POOL #0702328 .000 4.886 AAA 102.332 150,118.82 .05
31401AHD2 5.000% 05/01/2018 DD 04/01/03 AAA 151,676.28 .04
78,952.24 FNMA POOL 00703195 .000 5.679 AAA 105.656 82,431.08 .02
31401BGC3 6.000% 01/01/2017 DD 04/01/03 AAA 83,417.98 .02
299,062.58 FNMA POOL #0709148 .000 4.886 AAA 102.332 308,034.46 .10
31401HZM7 5.000% 06/01/2018 DD 06/01/03 AAA 306,036.81 .08
696,034.89 FNMA POOL #0709360 .000 4.879 AAA 102.488 704,952.84 .24
31401JB56 5.000% 07/01/2018 DD 06/01/03 AAA 713,354.19 .18
142,521.39 FNMA POOL #0709826 .000 4.886 AAA 102.332 144,347.44 .04
31401JSP4 5.000% 06/01/2018 DD 06/01/03 AAA 145,B45.03 .04
263,009.67 FNMA POOL #0709917 .000 4.886 AAA 102.332 266,379.48 .09
31401JVJ4 5.000% 06/01/2018 DD 06/01/03 AAA 269,143.13 .07
26,627.70 FNMA POOL #0709963 .000 4.886 AAA 102.336 26,968.87 .00
31401JWYO 5.000% 06/01/2018 DD 06/01/03 AAA 27,249.76 .01
796,757.69 FNMA POOL #0710235 .000 4.886 AAA 102.332 820,660.43 .27
31401KBC8 5.000% 06/01/2018 DD 06/01/03 AAA 815,338.32 .21
25,686.21 FNMA POOL #0713344 .000 4.806 AAA 102.332 26,456.79 .00
31401NP52 5.000% 06/01/2018 DD 06/01/03 AAA 26,285.22 .01
t
YLDANAL YIELD ANALYSIS PAGE 10
OCSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
335,257.93 FNMA POOL #0713365 .000 4.886 AAA 102.332 339,553.42 .11
31401NQSI 5.000% 07/01/2018 DD 07/01/03 AAA 343,076.25 .09
973,922.84 FNMA POOL #0720319 .000 4.886 AAA 102.332 986,401.22 .33
31401WG45 5.000% 07/01/2018 DD 07/01/03 AAA 996,635.01 .26
2,428,707.38 FNMA POOL #0720369 .000 4.886 AAA 102.336 2,501,568.60 .84
31401WJN0 5.000% 06/01/2018 DD 06/01/03 AAA 2,485,445.29 .64
312,634.84 FNMA POOL #0721629 .000 4.879 AAA 102.488 322,013.89 .10
31401XVW4 5.000% 07/01/2018 DD 06/01/03 AAA 320,414.07 .08
252,251.28 FNMA POOL #0723487 .000 4.886 AAA 102.332 255,089.11 .08
31402AXQ4 5.000% 06/01/2018 DD 06/01/03 AAA 258,133.86 .07
426,364.82 FNMA POOL #0729601 .000 4.879 AAA 102.488 431,827.62 .14
31402HRW3 5.000% 07/01/2018 DD 07/01/03 AAA 436,973.97 .11
36,444.57 FNMA POOL #0732873 .000 4.873 AAA 102.613 36,911.51 .01
31402MFNS 5.000% 11/01/2018 DD 10/01/03 AAA 37,396.97 .01
747,867.91 FNMA POOL #0737130 .000 4.879 AAA 102.488 757,449.96 .25
31402S4P9 5.000$ 10/01/2018 DD 10/01/03 AAA 766,476.96 .20
590,349.37 FNMA POOL #0738211 .000 4.886 AAA 102.336 597,913.23 .20
31402UDQ2 5.000% 10/01/2018 DD 10/01/03 AAA 604,140.73 .16
224,140.14 FNMA POOL #0738487 .000 4.886 AAA 102.332 227,011.93 .07
31402UNC2 5.000% 10/01/2018 DD 10/01/03 AAA 229,367.16 .06
697,632.82 FNMA POOL 10740471 .000 4.886 AAA 102.336 706,571.23 .24
31402WT40 5.000% 10/01/2018 DD 10/01/03 AAA 713,930.47 .18
827,537.73 FNMA POOL #0740748 .000 4.886 AAA 102.332 838,140.55 .28
31402W5H7 5.000% 10/01/2018 DD 11/01/03 AAA 846,836.16 .22
44,604.14 FNMA POOL #0743868 .000 4.886 AAA 102.336 45,175.63 .01
31403BMRI 5.000% 11/01/2018 DD 10/01/03 AAA 45,646.15 .01
1,148,016.50 FNMA POOL #0744008 .000 4.886 AAA 102.332 1,162,725.46 .39
31403BR54 5.000% 07/01/2018 DD 09/01/03 AAA 1,174,788.59 .30
172,719.45 FNMA POOL 10744316 .000 4.886 AAA 102.336 174,932.42 .0S
31403B324 5.000% 09/01/2018 DD 09/01/03 AAA 176,754.41 .05
YLDANAL YIELD ANALYSIS PAGE 11
0CSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
361,547.49 FNMA POOL #0747914 .000 4.886 AAA 102.332 366,179.82 .12
31403F3X0 5.000% 11/01/2018 DD 11/01/03 AAA 369,978.89 .10
243,351.27 FNMA POOL #0748400 .000 4.086 AAA 102.336 246,469.22 .08
31403GNR9 5.000% 08/01/2018 DD 09/01/03 AAA 249,036.29 .06
1,034,427.41 FNMA POOL #0748899 .000 4.883 AAA 102.393 1,047,691.01 .35
31403G7L0 5.000% 12/01/2018 DD 11/01/03 AAA 1,059,185.42 .27
2,539,874.78 FNMA POOL #0750377 .000 4.983 AAA 102.393 2,572,416.92 .88
31403JUA2 5.000% 11/01/2018 DD 11/01/03 AAA 2,600,664.19 .67
2,129,602.89 FNMA POOL #0750380 .000 4.883 AAA 102.393 2,156,888.44 .73
31403JUD6 5.000% 11/O1/2010 DD 11/01/03 AAA 2,180,572.85 .56
193,323.00 FNMA POOL #0750445 .000 4.883 AAA 102.393 195,799.95 .06
31403JWE2 5.000% 11/01/2018 DD 11/01/03 AAA 197,950.00 .05
907,869.35 FNMA POOL #0751960 .000 4.886 AAA 102.336 919,501.43 .31
31403LMH1 5.000% 12/01/2018 DD 11/01/03 AAA 929,078.41 .24
991,394.12 FNMA POOL #0753425 .000 4.886 AAA 102.332 1,002,957.11 .34
31403NA23 5.000% 11/01/2018 DD 11/01/03 AAA 1,014,513.73 .26
647,108.54 FNMA POOL #0755165 .000 4.879 AAA 102.488 655,399.61 .22
31403Q6A3 5.000% 12/01/2018 DD 11/01/03 AAA 663,210.41 .17
991,702.32 FNMA POOL #0756372 .000 4.879 AAA 102.488 1,003,168.87 .34
31403SJRB 5.000% 11/01/2018 DD 11/01/03 AAA 1,016,378.65 .26
298,575.30 GNMA POOL #0596612 .000 6.145 AAA 105.785 313,364.10 .10
36200BYH4 6.500% 09/15/2032 DD 09/01/02 AAA 315,848.36 .08
1,169,942.54 GNMA POOL #0569358 .000 6.163 AAA 105.465 1,197,363.07 .41
36200QQK3 6.500% 04/15/2032 DD 04/01/02 AAA 1,233,882.53 .32
49,792.15 GNMA POOL #0569685 .000 6.143 AAA 105.816 52,258.41 .01
36200Q2S2 6.500% 02/15/2032 DD 02/01/02 AAA 52,688.27 .01
86,245.92 GNMA POOL #0570019 .000 6.143 AAA 105.816 90,517.79 .03
36200RG48 6.500% 07/15/2032 DD 07/01/02 AAA 91,262.34 .02
494,313.09 GNMA POOL #0574323 .000 6.143 AAA 105.816 510,797.04 .17
36200WAY7 6.500% 12/15/2031 DD 12/01/01 AAA 523,064.37 .13
YLDANAL YIELD ANALYSIS PAGE 12
OCSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
52,644.83 GNMA POOL #0575364 .000 6.143 AAA 105.816 55,252.39 .01
3620OXFD6 6.500% 11/15/2031 DD 11/01/01 AAA 55,706.87 .01
20,877.54 GNMA POOL #0587117 .000 6.143 AAA 105.816 21,911.63 .00
36201MG22 6.500% 06/15/2032 DD 06/01/02 AAA 22,091.86 .01
59,744.81 GNMA POOL #0587439 .000 6.145 AAA 105.785 62,704.04 .02
36201MS45 6.500% 11/15/2032 DD 12/01/02 AAA 63,201.14 .02
14,543.72 GNMA POOL #0421389 .000 6.123 AAA 106.160 15,264.10 .00
36206UC23 6.500% 04/15/2026 DD 04/01/96 AAA 15,439.64 .00
22,897.80 GNMA POOL #0449851 .000 6.157 AAA 105.571 24,031.96 .00
36208FWLO 6.500% 01/15/2028 DD 01/01/98 AAA 24,173.44 .01
67,274.69 GNMA POOL #0466845 .000 6.130 AAA 106.035 70,606.89 .02
36209BTA6 6.500% 06/15/2028 DD 06/01/98 AAA 71,334.83 .02
113,362.74 GNMA POOL #0468052 .000 6.130 AAA 106.035 118,977.74 .04
36209C5M4 6.500% 07/15/2020 DD 07/01/98 AAA 120,204.36 .03
185,221.57 GNMA POOL #0476041 .000 6.130 AAA 106.035 194,106.42 .06
36209MZE7 6.500% 06/15/2028 DD 06/01/98 AAA 196,399.99 .05
164,068.79 GNMA POOL #0478626 .000 6.135 AAA 105.941 171,938.97 .05
36209QVT9 6.500% 01/15/2029 DD 01/01/99 AAA 173,816.79 .04
122,999.51 GNMA POOL #0480598 .000 6.130 AAA 106.035 128,899.65 .04
36209S3F6 6.500% 10/15/2028 DD 10/01/98 AAA 130,422.73 .03
435,166.85 GNMA POOL #0485527 .000 6.143 AAA 105.816 456,721.21 .15
36209YLG1 6.500% 06/15/2031 DD 06/01/01 AAA 460,477.94 .12
490,736.10 GNMA POOL #0485610 .000 6.143 AAA 105.816 515,042.87 .17
36209YN38 6.500% 07/15/2031 DD 07/01/01 AAA 519,279.32 .13
97,203.30 GNMA POOL #0485682 .000 6.143 AAA 105.816 102,017.90 .03
36209YRB6 6.500% 08/15/2031 DD 08/01/01 AAA 102,857.04 .03
88,984.95 GNMA POOL #0485703 .000 6.143 AAA 105.816 93,392.49 .03
36209YRY6 6.500% 08/15/2031 DD 08/01/01 AAA 94,160.68 .02
10,919.14 GNMA POOL #0512235 .000 6.135 AAA 105.941 11,459.97 .00
36211GBC6 6.500% 11/15/2029 DD 11/01/99 AAA 11,567.89 .00
YLDANAL YIELD ANALYSIS PAGE 13
OCSF07522202 2004/01/31 RUN DATE : 02/06/04
DISTRICTS LONG-TERM OPERATING RUN TIME : 10.22.29
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
149,132.18 GNMA POOL 00514326 .000 6.135 AAA 105.941 156,285.86 .05
36211JLF2 6.500% 07/15/2029 DD 07/01/99 AAA 157,992.73 .04
48,117.93 GNMA POOL #0530053 .000 6.164 AAA 105.449 50,501.28 .01
36212CZS3 6.500% 04/15/2031 DD 04/01/01 AAA 50,739.95 .01
104,930.70 GNMA POOL #0537885 .000 6.143 AAA 105.816 110,128.04 .03
3621214REI 6.500% 02/15/2031 DD 02/01/01 AAA 111,033.90 .03
12,796.49 GNMA POOL #0547512 .000 6.143 AAA 105.816 13,430.31 .00
36212YGV9 6.500% 04/15/2031 DD 04/01/01 AAA 13,540.78 .00
129,171.50 GNMA POOL #0547715 .000 6.143 AAA 105.816 134,319.73 .04
36212YN82 6.500% 02/15/2031 DD 02/01/01 AAA 135,626.48 .03
73,114.91 GNMA POOL #0552322 .000 6.143 AAA 105.816 76,736.30 .02
36213ESK3 6.500% 01/15/2032 DD 01/01/02 AAA 77,367.57 .02
539,265.43 GNMA POOL #0552466 .000 6.163 AAA 105.465 565,975.93 .19
36213EW36 6.500% 03/15/2032 DD 03/01/02 AAA 568,737.50 .15
437,113.67 GNMA POOL #0552659 .000 6.143 AAA 105.816 458,764.44 .15
36213E5U6 6.500% 07/15/2032 DD 07/01/02 AAA 462,537.99 .12
437,479.71 GNMA POOL #0561017 .000 6.143 AAA 105.816 459,148.62 .15
36213QG29 6.500% 07/15/2031 DD 07/01/01 AAA 462,925.32 .12
268,285.73 GNMA II POOL #0080395 .000 3.450 AAA 101.449 265,854.39 .09
36225CNM4 VAR RT 04/20/2030 DD 04/01/00 AAA 272,174.13 .07
2,393,819.27 GNMA II POOL #080408X .000 3.450 AAA 101.450 2,369,507.04 .82
36225CN28 6.500% 05/20/2030 DD 05/01/00 AAA 2,428,530.85 .63
5,000,000.00 GENERAL ELEC CAP MTN #TR 00575 .000 5.183 AAA 105.156 5,203,500.00 1.78
36962GZY3 5.450% 01/15/2013 DD 12/06/02 AAA 5,257,800.00 1.36
3,000,000.00 GENERAL MTRS ACCEP CORP SR NT .000 5.747 A3 • 106.578 3,064,350.00 1.08
370425SD3 6.125% 08/28/2007 DD 08/29/02 BBB 3,197,340.00 .82
3,000,000.00 GOLDMAN SACHS GROUP INC SR NT .000 4.011 AA3 102.843 3,030,030.00 1.04
38141GCSI 4.125% 01/15/2008 DD 01/13/03 A+ 3,085,290.00 .80
1,635,000.00 HOUSEHOLD FIN CORP NT .000 5.726 Al 111.343 1,772,820.00 .61
441812JW5 6.375% 10/15/2011 DD 10/23/01 A 1,820,458.05 .47
t
YLDANAL YIELD ANALYSIS PAGE 14
PCSF07522202 2004/01/31 RUN DATE : 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
3,000,000.00 JP MORGAN CHASE & CO SUB NT .000 5.368 A2 107.109 3,127,260.00 1.08
46625HAT7 5.750% 01/02/2013 DD 11/25/02 A 3,213,270.00 .83
3,200,000.00 MORGAN STANLEY NT .000 3.605 AA3 100.562 3,195,648.00 1.09
617446HW2 3.625% 04/01/2008 DD 03/06/03 A+ 3,217,984.00 .03
3,000,000.00 NATIONAL RURAL UTILS COOP FIN 000 6.167 A2 117.562 3,465,480.00 1.19
637432CU7 7.250% 03/01/2012 DD 03/07/02 A 3,526,860.00 .91
1,000,000.00 PHILIP MORRIS COS INC NTS .000 7.419 BAA2 101.093 1,052,600.00 .34
718154CHO 7.500% 04/01/2004 DD 04/01/97 BBB 1,010,930.00 .26
984,505.70 RESIDENTIAL ASSET 03-RSI1 AIIB .000 1.432 AAA 99.675 984,505.70 .33
760985KB3 VAR RT 12/25/2033 DD 12/30/03 AAA 983,275.07 .25
3,497,276.28 SBA GTD DEV PARTN 2001-20C 1 .000 5.845 AAA 108.465 3,497,276.28 1.28
83162CLJO 6.340% 03/01/2021 AAA 3,793,320.72 .98
2,425,788.58 SBA GTD PARTN CTFS SBIC-PS 01 .000 6.204 AAA 107.020 2,425,708.58 .88
831641DD4 6.640% 02/10/2011 DD 02/21/01 NR 2,596,078.94 .67
1,600,000.00 UNITED AIRLS PASSTHRU 01-1 C .000 37.730 CA 18.105 1,600,000.00 .09
909317BC2 6.831% 03/01/2010 DD 08/22/01 A- 289,600.00 .07
20,000,000.00 U S TREASURY NOTES .000 5.612 AAA 111.375 22,620,312.50 7.55
9128272JO 06.250% 02/15/2007 DD 02/15/97 AAA 22,275,000.00 5.75
3,426,390.00 US TREASURY INFLATION INDEX NT .000 3.259 AAA 111.281 3,736,244.03 1.29
9128273T7 3.625% 01/15/2008 DD 01/15/98 AAA 3,812,938.19 .98
14,626,300.00 US TREASURY INFLATION INDEX NT .000 3.402 AAA 113.906 16,253,511.35 5.65
9128274Y5 3.875% 01/15/2009 DD 01/15/99 AAA 16,660,306.41 4.30
57,100,000.00 U S TREASURY NOTES .000 5.368 AAA 107.125 62,782,901.47 20.74
9128276N7 05.750% 11/15/2005 DD 11/15/00 AAA 61,168,375.00 15.78
12,000,000.00 U S TREASURY NT .000 3.217 AAA . 101.030 11,870,156.25 4.11
912828BG4 3.250% 08/15/2008 DD 08/15/03 AAA 12,123,600.00 3.13
3,000,000.00 VERIZON GLOBAL FDG CORP GLOBAL .000 6.326 A2 116.578 3,530,490.00 1.18
92344GAT3 7.375% 09/01/2012 DD 08/26/02 A+ 3,497,340.00 .90
1,750,000.00 VIRGINIA ELEC & PWR 01 SER A .000 5.375 A3 106.960 1,743,840.00 .63
927804ENO 5.750% 03/31/2006 DD 03/27/01 BBB+ 1,871,940.00 .48
:
YLDANAL YIELD ANALYSIS PAGE 15
OCSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
16,304,540.00 US TREASURY INFLATION INDEX NT 3.817 3.101 AAA 108.844 14,384,422.02 6.01
9128272M3 3.375% 01/15/2007 DD 01/15/97 AAA 17,746,513.52 4.58
15,500,000.00 FEDERAL NATL MTG ASSN DEBS 5.967 6.735 AAA 105.794 16,154,410.00 5.56
31359MFH1 7.125% 02/15/2005 DD 02/14/00 AAA 16,398,088.60 4.23
1,061,097.19 FHLMC MULTICLASS MTG SER E3 A 6.316 3.696 AAA 103.113 1,062,227.65 .37
3133TCE95 VAR RT 08/15/2032 DD 12/01/97 AAA 1,094,129.15 .28
699,738.88 GNMA GTD REMIC TR 2000-9 FH 6.320 1.590 AAA 100.604 699,738.08 .23
3837H4NX9 VAR RT 02/16/2030 AAA 703,965.30 .18
7,316.30 GNMA POOL #0500917 6.389 5.729 AAA 104.723 6,944.76 .00
36210SPAO 6.000% 04/15/2029 DD 04/01/99 AAA 7,661.82 .00
35,337.84 GNMA POOL #0506636 6.399 5.729 AAA 104.723 33,543.33 .01
36210YY90 6.000% 04/15/2029 DD 04/01/99 AAA 37,006.73 .01
311,751.24 GNMA POOL #0503380 6.399 5.729 AAA 104.723 295,920.12 .11
36210VF55 6.000% 03/15/2029 DD 03/01/99 AAA 326,474.19 .00
12,651.90 GNMA POOL #0499153 6.389 5.729 AAA 104.723 12,009.42 .00
36210QQE5 6.000% 02/15/2029 DD 02/01/99 AAA 13,249.41 .00
410,770.39 GNHA POOL #0496461 6.390 5.729 AAA 104.723 389,910.95 .14
36210MQN4 6.000% 01/15/2029 DD 01/01/99 AAA 430,169.68 .11
105,963.24 GNMA POOL #0491103 6.390 5.729 AAA 104.723 100,582.31 .03
36210FRY4 6.000% 01/15/2029 DD 01/01/99 AAA 110,967.52 .03
12,077.30 GNMA POOL #0486720 6.390 5.729 AAA 104.723 11,464.01 .00
36210AVM6 6.000% 12/15/2028 DD 12/01/98 AAA 12,647.67 .00
22,500.34 GNMA POOL #0497343 6.390 5.729 AAA 104.723 21,357.75 .00
3621ONP45 6.000% 12/15/2028 DD 12/01/98 AAA 23,562.95 .01
15,442.66 GNMA POOL #0469688 6.391 5.729 AAA 104.723 14,658.45 .00
36209EXRB 6.000% 11/15/2028 DD 11/01/98 AAA 16,171.96 .00
20,617.14 GNMA POOL #0467279 6.391 5.729 AAA 104.723 19,570.18 .00
36209CCQ7 6.000% 10/15/2028 DD 10/01/98 AAA 21,590.82 .01
36,944.46 GNMA POOL #0457814 6.391 5.729 AAA 104.723 35,068.36 .01
36208QSB3 6.000% 10/15/2028 DD 10/01/98 AAA 38,689.22 .01
r
YLDANAL YIELD ANALYSIS PAGE s 16
0CSF07522202 2004/01/31 RUN DATE 02/06/04
DISTRICTS LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOR YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
397,524.45 GNMA POOL #0467286 6.391 5.729 AAA 104.723 377,337.66 .14
36209CCX2 6.000% 10/15/2028 DO 10/01/98 AAA 416,298.18 .11
493,489.57 GNMA POOL #0465555 6.392 5.729 AAA 104.723 468,429.56 .17
36209AE48 6.000% 09/15/2028 DD 09/01/98 AAA 516,795.40 .13
13,171.18 GNMA POOL #0483452 6.392 5.729 AAA 104.723 12,502.34 .00
36209WBV3 6.000% 09/15/2028 DO 09/01/99 AAA 13,793.21 .00
458,238.47 GNMA POOL #0465546 6.392 5.729 AAA 104.723 434,968.55 .16
36209AET3 6.000% 08/15/2028 DD 08/01/98 AAA 479,879.51 .12
304,340.62 GNMA POOL #0468339 6.392 5.729 AAA 104.723 288,885.84 .10
36209DHQ0 6.000% 08/15/2028 DD 08/01/98 AAA 318,713.59 .08
18,607.22 GNMA POOL #0438057 6.393 5.726 AAA 104.785 17,662.33 .00
36207PTN9 6.000% 05/15/2028 DD 05/01/98 AAA 19,497.61 .01
18,836.70 GNMA POOL #0468330 6.393 5.729 AAA 104.723 17,880.13 .00
36209DHF4 6.000% 05/15/2028 DD 05/01/98 AAA 19,726.29 .01
3,032,099.71 FHLMC MULTICLASS CTF SER 1620Z 6.499 5.676 AAA 105.716 2,875,959.77 1.08
3133T17A4 6.000% 11/15/2023 DO 11/01/93 AAA 3,205,414.53 .83
327,492.79 GNMA II POOL #080088M 6.705 4.308 AAA 101.553 334,656.69 .11
36225CC20 7.375% 06/20/2027 DD 06/01/97 AAA 332,578.75 .09
2,000,000.00 MARSH & MCLENNAN COS INC SR NT 6.717 6.500 A2 101.921 1,992,280.00 .69
57174BABB 6.625% 06/15/2004 DD 06/14/99 AA- 2,038,420.00 .53
2,500,000.00 FORD MTR CR CO GLOBAL LANDMARK 6.739 6.559 A3 102.156 2,495,900.00 .86
345397SJ3 6.700% 07/16/2004 DO 07/16/99 BBB- 2,553,900.00 .66
2,500,000.00 COUNTRYWIDE HOME LNS INC NT 6.866 6.717 A3 101.984 2,498,400.00 .86
22237UABS 6.850% 06/15/2004 DO 06/24/99 A 2,549,600.00 .66
221,394.24 GNMA II POOL #0080023 6.992 5.487 AAA 102.516 225,061.08 .07
36225CAZ9 VAR RT 12/20/2026 DD 12/01/96 AAA 226,965.07 .06
2,100,000.00 FEDERAL NATL MTG ASSN DEBS 7.113 5.778 AAA 114.666 2,030,133.00 .B1
31359MEY5 6.625% 09/15/2009 DD 09/01/99 AAA 2,407,985.79 .62
1,000,000.00 FORD MOTOR CR CO NT 7.592 6.429 A3 105.000 965,170.00 .35
345397GV9 6.750% 05/15/2005 DO 05/24/93 BBB- 1,050,000.00 .27
YLDANAL YIELD ANALYSIS PAGE 17
OCSF07522202 2004/01/31 RUN DATE 02/06/04
'DISTRICT: LONG-TERM OPERATING RUN TIME 10.22.29
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE % TOTAL
----------------- ----------------------------- ------ ------- ------- -------- ------------ ----------
945,144.52 WMP/BUNTOON PAIGE #000-11150 7.684 7.370 AAA 101.762 924,617.17 .32
302998GE3 7.500% 12/01/2030 DD 10/21/99 AAA 961,794.28 .25
3,000,000.00 PACIFICORP SECD MTN #TR 00115 7.709 7.020 A3 103.984 2,950,530.00 1.05
69512EEU5 7.300% 10/22/2004 DD 10/22/92 A 3,119,520.00 .80
1,600,000.00 ALLSTATE CORP SR NT 7.967 7.329 Al 107.453 1,594,032.00 .58
020002AL5 7.875% 05/01/2005 DD 05/01/00 A+ 1,719,248.00 .44
-------- ------- ----------------- ---------
TOTAL FIXED INCOME SECURITIES .378 5.212 290,124,807.49 100.00
294,841,061.83 76.01
-------- ------- ----------------- ---------
TOTAL, .359 4.946 382,907,039.39 100.00
387,623,293.73 100.00
----------------- ---------
----------------- -----------
Asset Detail Report ID: GL8013-
/ Base Currency: USD
Mellon
by Currency Alternate Base Currency:
Exchange Rate:
OCSD-CONSOIdDATED-OCSGOOO 10000 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base .Base Total Base
U.S. DOLLAR
CASH&CASH EQUIVALENTS
INTEREST RECEIVABLE 4,074,981.45 4,074,981.45 0.85% 0.00
RECEIVABLE FOR INVESTMENTS 28,598.26 28,598.26 0.01% 0.00
SOLD
PAYABLE FOR INVESTMENTS -3,097,704.96 -3,097,704.96 -0.65% 0.00
PURCHASED
DU PONT DE NEMOUR DISC 99.8667 4,500,000.000 4,494,000.00 4,494,000.00 0.94% 0.00
03/08/2004
SEC ID:26354AC85
EUROPEAN INVEST DISC 99.7321 900,000.000 897,588.50 897,588.50 0.19% 0.00
03/15/2004
SEC ID:29878RCF3
FEDERAL HOME LN BK CONS DISC N 99.8681 5,200,0100.000 5,193,143.22 5,193,143.22 1.08% 0.00
MAT 02/04/2004
SEC ID:313384SRI
FEDERAL HOME LN BK CONS DISC 99.6879 11000,000.000 996,879.16 996,879.16 0.21% 0.00
SEC ID: 313384SS9
FEDERAL HOME LN BK CONS DISC 99.6136 600,0,00.000 597,681.67 597,681.67 0.12% 0.00
MAT 02/09/2004
SEC ID:313384SWO
FEDERAL HOME LN BK CONS DISC 99.7321 2,000,000.000 1,994,641.11 1,994,641.11 0.42% 0.00
MAT 02/25/2004
SEC 1D: 313384TN9
FEDERAL HOME LN BK CONS DISC N 99.7421 4.,500,0.00.000 4,488,395.00 4,488,395.00 0.94% 0.00
MAT 03/12/2004
SEC ID: 313384UE7
FEDERAL HOME LN BKS CINS DISC 99,4625 900,000.000 895,162.50 895,162.50 0.19% 0.00
MAT 03/17/2004
SEC ID:313384UK3
FEDERAL HOME LN BK CONS DISC N 99.7510 l l,.800,0,00.000 11,770,622.63 11,770,622.63 2.45% 0.00
MAT 04/14/2004
SEC ID:313384VPI
FEDERAL HOME LN BK CONS DISC N 99.7460 900,0100.000 897,713.63 897,713.63 0.19% 0.00
MAT 04/28/2004
SEC ID:313384WD7
FEDERAL HOME LN BK CONS DISC 99.4313 2,000,000.000 1,988,625.00 1,988,625.00 0.41% 0.00
MAT 05/19/2004
SEC ID:313384XA2
FEDERAL HOME LN MTG CORP DISC 99.6614 4,700,0,00.000 4,684,085.28 4,684,085.28 0.98% 0.00
MAT 02/02/2004
SEC 1D: 313396SP9
21612004 1:42:04PM PST 1 Workbench
Asset Detail Report ID: GL8013
/ Base Currency: USD
Mellon
by Currency Alternate Base Currency:
Exchange Rate:
za�Ur z1Uz/m00:10 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
FEDERAL HOME LN MTG CORP DISC 99.7240 2,500,0-00.000 2,493,100.00 2,493,100.00 0.52% 0.00
MAT 02/12/2004
SEC ID: 313396SZ7
FEDERAL HOME LN MTG CORP DISC 99.7602 6,000,0-00.000 5,985,610.83 5,985,610.83 1.25% 0.00
MAT 02/26/2004
SEC ID: 313396TP8
FEDERAL HOME LN MTG CORP DISC 99.5807 2,100.0-00.000 2,091,194.00 2,091,194.00 0.44% 0.00
MAT 03/22/2004
SEC ID: 313396UQ4
FEDERAL HOME LN MTG CORP DISC 99.4225 3,800,0.00.000 3,778,055.00 3,778,055.00 0.79% 0.00
MAT 03/31/2004
SEC ID: 313396UZ4
FEDERAL HOME LN MTG CORP DISC 99.7528 10,000,000.000 9,975,277.78 9,975,277.78 2.08% 0.00
MAT 04/13/2004
SEC ID:313396VNO
FEDERAL HOME LN MTG CORP DISC 99.7472 1,700,000.000 1,695,702.78 1,695,702.78 0.35% 0.00
MAT 04/20/2004
SEC ID: 313396VV2
FEDERAL HOME LN MTG CORP DISC 99.7478 1,200,000.000 1,196,974.00 1,196,974.00 0.25% 0.00
MAT 04/27/2004
SEC ID: 313396WC3
FEDERAL NATL MTG ASSN DISC NT 99.8713 5,.200,000.000 5,193,305.00 5,193,305.00 1.08% 0.00
MAT 02/02/2004
SEC ID: 313588SPI
FEDERAL NATL MTG ASSN DISCOUNT 99,9000 400,0-00.000 399,600.00 399,600.00 0.08% 0.00
MAT 02/04/2004
SEC ID: 313588SR7
FEDERAL NATL MTG ASSN DISC NT 99.7820 8,400,0.00.000 8,380,074.22 8,380,074.22 1.75% 0.00
SEC ID: 313588TF2
FEDERAL NATL MTG ASSN DISCOUNT 99.5530 3,.800,000.000 3,783,014.00 3,783,014.00 0.79% 0.00
MAT 02/19/2004
SEC ID:313588TGO
FEDERAL NATL MTG ASSN DISCOUNT 99.7450 8,400,000.000 8,378,580.00 8,378,580.00 1.75% 0.00
MAT 02/25/2004
SEC ID: 313588TN5
FEDERAL NATL MTG ASSN DISCOUNT 99.7270 400,000.000 398,908.00 398,908.00 0.08% 0.00
MAT 03/03/2004
SEC ID: 313588TV7
FEDERAL NATL MTG ASSN DISCOUNT 99.7350 1,000,000.000 997,350.00 997,350.00 0.21% 0.00
MAT 03/10/2004
SEC ID: 313588UC7
FEDERAL NATL MTG ASSN DISC 99.7346 1,100,000.000 1,097,080.42 1,097,080.42 0.23% 0.00
SEC ID: 313588UK9
21612004 1:42:04PM PST 2 Workbench
Asset Detail Report ID: UL8013
Base Currency: USD
Mellon by Currency Alternate Base Currency:
Exchange Rate:
T^^ :_, 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of (lain/Loss
Description Base Shares Par Base Base Total Base
FEDERAL NATL MTG ASSN DISCOUNT 99.4262 2,000,000.000 1,988,523.89 1,988,523.89 0.41% 0.00
MAT 05/19/2004
SEC ID:313588XA8
GENERAL ELEC CAP DISC 99.9018 2,500,0-00.000 2,497,545.14 2,497,545.14 0.52% 0.00
02/24/2004
SEC ID:36959HBQ9
GENERAL ELEC CAP DISC 99.6331 1,800,0-00.000 1,793,395.50 1,793,395.50 0.37% 0.00
04/07/2004
SEC ID:36959HD79
U S TREASURY BILL 99,5160 5,700,0.00.000 5,672,410.42 5,672,410.42 1.18% 0.00
DUE 02/12/2004 DD 08/14/2003
SEC ID:912795PK 1
U S TREASURY BILL 99.7575 9,200,000.000 9,177,690.00 9,177,690.00 1.91% 0.00
0.000%03/11/2004 DD 09/11/03
SEC ID:912795PP0
U S TREASURY BILL 99.7853 6,500,000.000 6,486,041.25 6,486,041.25 1.35% 0.00
0.000%03/18/2004 DD 09/18/03
SEC ID: 912795PQ8
UNITED STATES TREASURY BILL 99.4870 17..000,0.00.000 16,912,790.02 16,912,790.02 3.53% 0.00
DUE 04/22/2004 DD 10/23/03
SEC ID:912795PV7
U S TREASURY BILL 99.4843 12,000,0-00.000 11,938,120.00 11,938,120.00 2.49% 0.00
0.000%04/29/2004 DD 10/30/03
SEC ID:912795PW5
U S TREASURY BILL 99.4820 4,400,000.000 4,377,207.88 4,377,207.88 0.91% 0.00
0.0009/605/06/2004 DD 11/06/03
SEC ID:912795PX3
U S TREASURY BILL 99.4906 6,200,000.000 6,168,416.07 6,168,416.07 1.29% 0.00
0.000%05/27/2004 DD 11/28/03
SEC ID:912795QA2
FIRST BOSTON CORP REPO 100.0000 9,500,000.000 9,500,000.00 9,500,000.00 1.98% 0.00
00.970%02/02/2004 DD O1/30/04
SEC ID:99415T115
DREYFUS TREASURY CASH MGMT 100.0000 322,193.520 322,193.52 322,193.52 0.07% 0.00
SEC ID:996085247
BSDT-LATE MONEY DEPOSIT ACCT 100.0000 1,000.000 1,000.00 1,000.00 0.00% 0.00
SEC ID:996087094
TOTAL CASH&CASH EQUIVALENTS 172,123,193.520 172,583,572.17 172,583,572.17 35.97% 0.00
FIXED INCOME SECURITIES
AIG SUNAMERICA GLOBAL REG S 109.8670 752,000,000 826,199.84 826,199.84 0.17% 0.00
5.850%08/01/2008 DD 08/08/01
SEC ID:U00907AA0
21612004 1:42:04PM PST 3 Workbench
Asset Detail Report m: OLS013
Base Currency: USD
Mellon by Currency Alternate Base Currency:
Exchange Rate:
2&01:,1iS21D2/,D0771❑ 1/31/2004 status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Lose
Description Base Shares Par Base Base Total Base
COMMIT TO PUR FNMA SF MTG 103.8047 3,000,000.000 3,097,695.31 3,114,140.70 0.65% 16,445.39
6.000%02/01/2034 DD 02/01/04
SEC 1D: 0IF060626
ALLSTATE CORP SR NT 107.4530 1,600,000.000 1,594,032.00 1,719,248.00 0.36% 125,216.00
7.875%05/01/2005 DD 05/01/00
SEC ID:020002AL5
ASSOCIATES CORP NA MTN SR00043 102.9370 100,D00.000 104,199.00 102,937.00 0.02% -1,262.00
7.920%07/13/2004 DD 07/13/94
SEC ID:045906BU7
ASSOCIATES CORP NORTH AMER 100.9840 1,000,000.000 1,041,290.00 1,009,840.00 0.21% -31,450.00
5.800%04/20/2004 DD 04/20/99
SEC ID:046003KA6
BANK OF AMERICA CORP SR GBL NT 101.9840 500,000.000 518,385.00 509,920.00 0.11% -8,465.00
6.625%06/15/2004 DD 06/15/99
SEC ID:066050CW3
BELL ATLANTIC-NEW JERSEY INC 100.0000 650,000.000 677,046.50 650,000.00 0.14% -27,046.50
5.875%02/01/2004 DD 02/01/94
SEC ID:077858AA6
C1T GROUP INC NEW SR NT 107.4060 1,500,000.000 1,527,135.00 1,611,090.00 0.34% 83,955.00
5.500% 11/30/2007 DD 12/02/02
SEC ID: 125581ADO
CITIGROUP INC GLOBAL SUB NT 106.6870 5,000,000.000 5,333,600.00 5,334,350.00 1.11% 750.00
5.625%08/27/2012 DD 08/26/02
SEC ID: 172967BP5
COUNTRYWIDE HOME LNS INC NT 101.9840 2,500,000.000 2,498,400.00 2,549,600.00 0.53% 51,200.00
6.850%06/15/2004 DD 06/24/99
SEC ID:22237UAB8
WMP/HUNTOON PAIGE Ill 50 101.7616 945,144.520 924,617.17 961,794.28 0.20% 37,177.11
7.500% 12/01/2030 DD 10/21/99
SEC ID:302998GE3
FHLMC GROUP NG4-0353 101.7046 78,846.780 80,842.60 80,190.80 0.02% -651.80
7.500% 10/01/2004 DD 03/01/99
SEC ID: 3128DBMA2
FEDERAL HOME LN BK CONS BDS 105.8233 7,500,0,00.000 7,997,625.00 7,936,746.75 1.65% -60,878.25
7.125%02/15/2005 DD 02/08/00
SEC ID:3133MAUN7
FHLMC MULTICLASS MTG SER E3 A 103.1130 1,061,097.190 1,062,227.65 1,094,129.15 0.23% 31,901.50
VAR RT 08/15/2032 DD 12/01/97
SEC ID:3133TCE95
FHLMC MULTICLASS CTF SER 1620Z 105.7160 3,032,099.710 2,875,959.77 3,205,414.53 0.67% 329,454.76
6.000% 11/15/2023 DD 11/01/93
SEC ID:3133T17A4
21612004 1:42:04PM PST 4 Workbench
Asset Detail Report ID: GL8013
Base Currency: USD
Mellon by Currency Alternate Base Currency:
28sP *21 2/,^^_7'7 1/31/2004 c�ngStat
^ us: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base, . Base Total Base
FEDERAL HOME LN MTG CORP DEB 100.5412 1,100,000.000 1,125,905.00 1,105,953.20 0.23% -19,951.80
3.750%04/15/2004 DD 04/15/02
SEC ID:3134A4PHI
FHLMC GROUP#78-6064 103.3664 78,922.060 76,998.32 81,578.89 0.02% 4,580.57
6.384%01/01/2028 DD 12/01/97
SEC ID:31348SWZ3
FEDERAL NATL MTG ASSN DEBS 100.1403 4,200,000.000 4,350,168,00 4,205,892.18 0.88% -144,275.82
5.125%02/13/2004 DD 02/08/99
SEC ID: 31359MEM1
FEDERAL NATL MTG ASSN DEBS 114.6660 2,100,000.000 2,030,133.00 2,407,985.79 0.50% 377,852.79
6.625%09/15/2009 DD 09/01/99
SEC ID:31359MEY5
FEDERAL NATL MTG ASSN DEBS 105.7941 15,500,000.000 16,154,410.00 16,398,088.60 3.42% 243,678.60
7.125%02/15/2005 DD 02/14/00
SEC ID:31359MFHI
FEDERAL NATL MTG ASSN DEBS 106.8966 11,350,000.000 11,521,271.50 12,132,758.43 2.53% 611,486.93
5.250%06/15/2006 DD 06/22/01
SEC ID:31359MJX2
FNMA POOL#0254510 102.3320 832,616.950 857,595.46 852,033.83 0.18% -5,561.63
5.000% 11/01/2017 DD 10/01/02
SEC ID:31371 KVB4
FNMA POOL#0254631 102.4570 176,487.830 181,782.47 180,824.19 0.04% -958.28
5.000%02/01/2018 DD 01/01/03
SEC ID:31371 KY47
FNMA POOL#0254760 102.4883 159,405.250 164,187.40 163,371.70 0.03% -815.70
5.000%06/01/2018 DD 05/01/03
SEC ID:31371K5V9
FNMA POOL#0254866 102.4883 69,607.320 71,695.55 71,339.35 0.01% -356.20
5.000%09/01/2018 DD 08/01/03
SEC ID: 31371LCB3
FNMA POOL#0254953 102.4883 369,272.410 374,003.72 378,460.94 0.08% 4,457.22
5.000% 11/01/2018 DD 10/01/03
SEC ID:31371 LE21
FNMA POOL#0254987 102.3361 989,316.580 1,001,992.19 1,012,428.36 0.21% 10,436.17
5.000% 12/01/2018 DD 11/01/03
SEC ID:31371LF46
FNMA POOL#0323980 105.5313 204,495.940 213,506.54 215,807.12 0.04% 2,300.58
6.000%04/01/2014 DD 09/01/99
SEC ID:31374T2M0
FNMA POOL#0357328 102.3580 31,747.720 32,700.15 32,496.33 0.01% -203.82
5.000%01/01/2018 DD 01/01/03
SEC ID:31376J4M8
21612004 1:42:04PM PST 5 Workbench
Asset Detail Report m: GL8013
Mellon
Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
26-7621-2/,^-7- ' 1/31/2004 status: FINAL,
Net Unrealized
Price Cost Market Value % of Cain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL#0357430 102.3320 1,586,486.620 1,604,334.60 1,623,483.96 0.34% 19,149.36
5.000%09/01/2018 DD 09/01/03
SEC ID: 31376KA71
FNMA POOL#0456482 105.5313 61,362.450 64,066.23 64,756.56 0.01% 690.33
6.000%02/01/2014 DD 02/01/99
SEC ID: 31381 CCT2
FNMA POOL#0509649 105.5313 175,430.910 183,160.84 185,134.43 0.04% 1,973.59
6.000%09/01/2014 DD 09/01/99
SEC ID: 31383QEW0
FNMA POOL#0535451 105.4063 161,716.770 168,842.42 170,459.58 0.04% 1,617.16
6.000%06/01/2015 DD 07/01/00
SEC ID:31384VZQ8
FNMA POOL#0535672 105.5313 3.498,227.480 3,652,368.14 3,691,723.19 0.77% 39,355.05
6.000%01/01/2016 DD 12/01/00
SEC ID:31384WCHl
FNMA POOL#0545296 105.3438 1 ,148,263.090 1,198,858.43 1,209,623.40 0.25% 10,764.97
6.000% 11/01/2016 DD 10/01/01
SEC ID:31385HXZ0
FNMA POOL#0545580 105.3438 96,898.250 101,167.82 102,076.25 0.02% 908.43
6.000%03/01/2017 DD 03/01/02
SEC ID:31385JCR7
FNMA POOL#0555101 105.4688 172,129.850 179,714.30 181,543.20 0.04% 1,828.90
6.000% 10/01/2017 DD 11/01/02
SEC ID: 31385WU23
FNMA POOL#0555285 103.9414 776,267.570 807,318.29 806,863.46 0.17% -454.83
6.000%03/01/2033 DD 02/01/03
SEC ID:31385W2S7
FNMA POOL#0555363 102.3320 380,738.810 392,160.97 389,617.75 0.08% -2,543.22
5.000%04/01/2018 DD 03/01/03
SEC ID:31385W5YI
FNMA POOL#0555453 102.4570 38,998.310 39,497.98 39,956.51 0.01% 458.53
5.000%05/01/2018 DD 04/01/03
SEC ID:31385XBW6
FNMA POOL#0555545 102.3320 317,525.090 327,050.85 324,929.87 0.07% -2,120.98
5.000%06/01/2018 DD 05/01/03
SEC ID:31385XES2
FNMA POOL#0555621 102.3361 1,102,850.900 1,115,257.97 1,128,615.00 0.24% 13,357.03
5.000%07/01/2018 DD 06/01/03
SEC ID:31385XG68
FNMA POOL#0576386 105.1370 64,663.420 67,512.65 67,985.19 0.01% 472.54
6.000%05/01/2016 DD 05/01/01
SEC ID: 31386XJ72
21612004 1:42:04PM PST 6 Workbeneh
Asset Detail Report m: GL8013
/ Base Currency: vsD
Mellon
by Currency Alternate Base Currency:
Exchange Rate:
2&e W 1^2/,0-,7 1/31/2004 status: FINAL
Net Unrealized
Price Cost Market Value % of Cain/Loss
Description Base Shares Par Base Base, Total Base
FNMA POOL#0576739 105.3438 173,931.370 181,595.22 183,225.83 0.04% 1,630.61
6.000%04/01/2016 DD 04/01/01
SEC ID:31386XV86
FNMA POOL#0580888 105.5938 230,571.900 240,731.47 243,469.52 0.05% 2,738.05
6.000%05/01/2016 DD 05/01/01
SEC ID:31387DJ91
FNMA POOL#0594002 105.3438 184,126.550 192,239.62 193,965.81 0.04% 1,726.19
6.000%07/01/2016 DD 07/01/01
SEC ID: 31387T3K8
FNMA POOL#0597376 105.3438 234,957.840 245,310.67 247,513.40 0.05% 2,202.73
6.000%09/01/2016 DD 08/01/01
SEC ID: 31387XT96
FNMA POOL#0605259 105.3438 157,839.890 164,794.71 166,274.46 0.03% 1,479.75
6.000%09/01/2016 DD 09/01/01
SEC ID: 31388HMG1
FNMA POOL#0608366 105.3438 102.6 74.040 107,198.12 108,160.68 0.02% 962.56
6.000% 10/01/2016 DD 09/01/01
SEC ID:31388LZ78
FNMA POOL 00616734 105.6563 169,865.390 177,350.08 179,473.40 0.04% 2,123.32
6.000% 12/01/2016 DD 12/01/01
SEC ID: 31388WEF9
FNMA POOL#0630812 105.1587 188,081,650 196,369.00 197,784.14 0.04% 1,415.14
6.000%02/01/2017 DD 02/01/02
SEC ID:31389NYH2
FNMA POOL#0632376 105.4688 826,323.450 862,733.34 871,513.01 0.18% 8,779.67
6.000%07/01/2017 DD 07/01/02
SEC ID: 31389QQ50
FNMA POOL#0653116 105.4688 472,082.110 492,883.23 497,899.10 0.10% 5,015.87
6.000%07/01/2017 DD 07/01/02
SEC ID: 31390QSD8
FNMA POOL#0673280 105.4688 188,315.610 196,613.27 198,614.12 0.04% 2,000.85
6.000%08/01/2017 DD 11/01/02
SEC ID: 31391P6R2
FNMA POOL#0681309 102,3320 570,407.770 587,520.00 583,709.85 0.12% -3,810.15
5.000%02/01/2018 DD 02/01/03
SEC ID:31391Y3S4
FNMA POOL#0681334 102.3320 71,3.51.970 73,492.52 73,015.92 0.02% -476.60
5.000%02/01/2018 DD 01/01/03
SEC ID:31391Y4T1
FNMA POOL#0684908 102.4570 352,619.460 357,137.40 361,283.43 0.08% 4,146.03
5.000%06/01/2018 DD 05/01/03
SEC ID:31400D3R1
21612004 1:42:04PM PST 7 Workbench
Asset Detail Report ID: GL8013
/ Mellon Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
2&00*2102/,0,3700 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL#0685200 102.3320 204,992.460 207,618.93 209,772.95 0.04% 2,154.02
5.000%03/01/2018 DD 03/01/03
SEC ID:31400EGH7
FNMA POOL#0685665 102.3320 36,400.740 37,492.77 37,249.62 0.01% -243.15
5.000%02/01/2018 DD 02/01/03
SEC ID: 31400EW22
FNMA POOL#0686318 102.3320 313,562.630 322,969.51 320,875.00 0.07% -2,094.51
5.000%03/01/2018 DD 03/01/03
SEC ID:31400FPB7
FNMA POOL#0688739 102.3320 123,443.250 127,146.55 126,321.98 0.03% -824.57
5.000%06/01/2018 DD 06/01/03
SEC ID: 31400JEL9
FNMA POOL#0689859 102.4883 126,963.830 128,489.27 130,020.56 0.03% 1,531.29
5.000%05/01/2018 DD 05/01/03
SEC ID:3140OKMG8
FNMA POOL#0693834 102.3320 738,363.940 760,514.86 755,582.81 0.16% -4,932.05
5.000%03/01/2018 DD 03/01/03
SEC ID: 3140OPY74
FNMA POOL#0695852 102.3320 269,944.760 278,043.10 276,239.95 0.06% -1,803.15
5.000%05/01/2018 DD 05/01/03
SEC ID:31400SBVO
FNMA POOL#0695889 102.3320 835,544.300 860,610.62 855,029.44 0.18% -5,581.18
5.000%05/01/2018 DD 05/01/03
SEC ID:31400SC23
FNMA POOL#0697026 102.3320 26,423.100 27,215.81 27,039.29 0.01% -176.52
5.000%05/01/2018 DD 04/01/03
SEC ID:31400TLF2
FNMA POOL#0698939 105.5938 91,476.220 95,506.89 96,593.17 0.02% 1,086.28
6.000%09/01/2017 DD 03/01/03
SEC ID:31400VPY2
FNMA POOL#0702210 102.3361 276,5,63.580 284,860.49 283,024.48 0.06% -1,836.01
5.000%05/01/2018 DD 05/01/03
SEC ID:31401ADP9
FNMA POOL#0702328 102.3320 148,219.750 150,118.82 151,676.28 0.03% 1,557.46
5.000%05/01/2018 DD 04/01/03
SEC ID:31401AHD2
FNMA POOL#0703195 105.6563 78,952.240 82,431.08 83,417.98 0.02% 986.90
6.000%01/01/2017 DD 04/01/03
SEC ID: 31401BGC3
FNMA POOL#0709148 102.3320 299,062.580 308,034.46 306,036.81 0.06% -1,997.65
5.000%06/01/2018 DD 06/01/03
SEC ID:31401HZM7
21612004 1:42:04PM PST 8 •Workbeneh
Asset Detail Report m: GL8013
Base Currency: USD
/ Mellon by Currency Alternate Base Currency:
Exchange Rate:
1-12/,--7^^ 1/31/2004 status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL#0709360 102.4883 696,034.890 704,952.84 713,354.19 0.15% 8,401.35
5.000%07/01/2018 DD 06/01/03
SEC ID:3140IJB56
FNMA POOL#0709826 102.3320 142,521.390 144,347.44 145,845.03 0.03% 1,497.59
5.000%06/01/2018 DD 06/01/03
SEC ID:31401JSP4
FNMA POOL#0709917 102.3320 263,009.670 266,379.48 269,143.13 0.06% 2,763.65
5.000%06/01/2018 DD 06/01/03
SEC ID: 31401JVJ4
FNMA POOL#0709963 102.3361 26,627.700 26,968.87 27,249.76 0.01% 280.89
5.000%06/01/2018 DD 06/01/03
SEC ID: 31401JWYO
FNMA POOL#0710235 102.3320 796,757.690 820,660.43 815,338.32 0.17% -5,322.11
5.000%06/01/2018 DD 06/01/03
SEC ID:31401KBC8
FNMA POOL#0713344 102.3320 25,586.210 26,456.79 26,285.22 0.01% -171.57
5.000%06/01/2018 DD 06/01/03
SEC ID:3140INP52
FNMA POOL#0713365 102.3320 335,257.930 339,553.42 343,076.25 0.07% 3,522.83
5.000%07/01/2018 DD 07/01/03
SEC ID:31401NQS1
FNMA POOL#0720319 102.3320 973,922.840 986,401.22 996,635.01 0.21% 10,233.79
5.000%07/01/2018 DD 07/01/03
SEC ID:31401WG45
FNMA POOL#0720369 102.3361 2„428,707.380 2,501,568.60 2,485,445.29 0.52% -16,123.31
5.000%06/01/2018 DD 06/01/03
SEC ID:31401WJNO
FNMA POOL#0721629 102.4883 312,634.840 322,013.89 320,414.07 0.07% -1,599.82
5.000%07/01/2018 DD 06/01/03
SEC ID:31401XVW4
FNMA POOL#0723487 102.3320 252,251.280 255,089.11 258,133.86 0.05% 3,044.75
5.000%06/01/2018 DD 06/01/03
SEC ID:31402AXQ4
FNMA POOL#0729601 102.4883 426,364.820 431,827.62 436,973.97 0.09% 5,146.35
5.000%07/01/2018 DD 07/01/03
SEC ID:31402HRW3
FNMA POOL#0732873 102.6133 36,444.570 36,911.51 37,396.97 0.01% 485.46
5.000% 11/01/2018 DD 10/01/03
SEC ID:31402MFN5
FNMA POOL#0737130 102.4883 747,867.910 757,449.96 766,476.96 0.16% 9,027.00
5.000% 10/01/2018 DD 10/01/03
SEC ID:31402S4P9
21612004 1:42:04PM PST 9 Workbench
Asset Detail Report M. GL8013
Base Currency: USD
Mellon by Currency Alternate Base Currency:
Exchange Rate:
2&0131&21 02/,❑❑7❑❑ 1/31/2004 status: FINAL
Net Unrealized`
Price Cost Market Value % of Gain/boss
Description Base Shares Par Base Base Total I Base
,i
FNMA POOL#0738211 102.3361 590,349.370 597,913.23 604,140.73 0.13% 6,227.50
5.000% 10/01/2018 DD 10/01/03
SEC ID: 31402UDQ2
FNMA POOL#0738487 102.3320 224,140.140 227,011.93 229,367.16 0.05% 2,355.23
5.000% 10/01/2018 DD 10/01/03
SEC ID: 31402UNC2
FNMA POOL#0740471 102.3361 697.632.820 706,571.23 713,930.47 0.15% 7,359.24
5.000% 10/01/2018 DD 10/01/03
SEC 1D:31402WT40
FNMA POOL#0740748 102.3320 827,537.730 838,140.55 846,836.16 0.18% 8,695.61
5.000% 10/01/2018 DD 11/01/03
SEC ID: 31402W5H7
FNMA POOL#0743868 102.3361 44,604.140 45,175.63 45,646.15 0.01% 470.52
5.000% 11/01/2018 DD 10/01/03
SEC ID: 31403BMRI
FNMA POOL#0744008 102.3320 1,148,016.500 1,162,725.46 1,174,788.59 0.24% 12,063.13
5.000%07/01/2018 DD 09/01/03
SEC ID:31403BR54
FNMA POOL#0744316 102.3361 172,719.450 174,932.42 176,754.41 0.04% 1,821.99
5.000%09/01/2018 DD 09/01/03
SEC ID: 31403B3Z4
FNMA POOL#0747914 102.3320 361,547.490 366,179.82 369,978.89 0.08% 3,799.07
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403F3X0
FNMA POOL#0748400 102.3361 243.351.270 246,469.22 249,036.29 0.05% 2,567.07
5.000%08/01/2018 DD 09/01/03
SEC ID: 31403GNR9
FNMA POOL#0748899 102.3934 1,034,427.410 1,047,681.01 1,059,185.42 0.22% 11,504.41
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31403G7L0
FNMA POOL#0750377 102.3934 2,539,874.780 2,572,416.92 2,600,664.19 0.54% 28,247.27
5.000% 11/01/2018 DD 11/01/03
SEC 1D: 31403JUA2
FNMA POOL#0750380 102.3934 2,129,602.890 2,156,888.44 2,180,572.85 0.45% 23,684.41
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403JUD6
FNMA POOL#0750445 102.3934 193,323.000 195,799.95 197,950.00 0.04% 2,150.05
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403JWE2
FNMA POOL#0751960 102.3361 907,869.350 919,501.43 929,078.41 0.19% 9,576.98
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31403LMH 1
2/6/2004 1:42:04PM PST 10 Workbench
Asset Detail Report ID: GL8013•
Base Currency: USD
Mellon by Currency Alternate Base Currency:
Exchange Rate:
2&11-r s21-2/,F? 7- 1/31/2004 status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
FNMA POOL#0753425 102.3320 991,394.120 1,002,857.11 1,014,513.73 0.21% 11,656.62
5.000% 11/01/2018 DD 11/01/03
SEC ID: 31403NA23
FNMA POOL 40755165 102.4883 647,108.540 655,399.61 663,210.41 0.14% 7,810.80
5.000% 12/01/2018 DD 11/01/03
SEC ID: 31403Q6A3
FNMA POOL 00756372 102.4883 991,702.320 1,003,168.87 1,016,378.65 0.21% 13,209.78
5.000% 11/01/2018 DD 11/01/03
SEC ID:31403SJR8
FORD MOTOR CR CO NT 105.0000 1,000.0-00.000 965,170.00 1,050,000.00 0.22% 84,830.00
6.750%05/15/2005 DD 05/24/93
SEC ID: 345397GV9
FORD MTR CR CO GLOBAL 102.1560 2,500,000.000 2,495,900.00 2,553,900.00 0.53% 58,000.00
LANDMARK
6.700%07/16/2004 DD 07/16/99
SEC ID: 345397SJ3
GNMA POOL#0596612 105.7852 298,575.300 313,364.10 315,848.36 0.07% 2,484.26
6.500%09/15/2032 DD 09/01/02
SEC ID:36200BYH4
GNMA POOL#0569358 105.4652 1,169,942.540 1,197,363.07 1,233,882.53 0.26% 36,519.46
6.500%04/15/2032 DD 04/01/02
SEC 1D: 36200QQK3
GNMA POOL#0569685 105.8164 49,792.150 52,258.41 52,688.27 0.01% 429.86
6.500%02/15/2032 DD 02/01/02
SEC ID:3620002S2
GNMA POOL#0570019 105.8164 86,245.920 90,517.79 91,262.34 0.02% 744.55
6.500%07/15/2032 DD 07/01/02
SEC ID:3620ORG48
GNMA POOL#0574323 105.8164 494,313.090 518,797.04 523,064.37 0.11% 4,267.33
6.500% 12/15/2031 DD 12/01/01
SEC ID: 36200WAY7
GNMA POOL#0575364 105.8164 52,644.830 55,252.39 55,706.87 0.01% 454.48
6.500% 11/15/2031 DD 11/01/01
SEC ID:36200XFD6
GNMA POOL 40587117 105.8164 20,877.540 21,911.63 22,091.86 0.00% 180.23
6.500%06/15/2032 DD 06/01/02
SEC ID:36201MG22
GNMA POOL#0587439 105.7852 59,744.810 62,704.04 63,201.14 0.01% 497.10
6.500% 11/15/2032 DD 12/01/02
SEC ID: 3620IMS45
GNMA POOL#0421389 106.1602 14,543.720 15,264.10 15,439.64 0.00% 175.54
6.500%04/15/2026 DD 04/01/96
SEC ID: 36206UC23
21612004 1:42:04PM PST 11 Workbench
Asset Detail Report ID: GGL8013
/ Mellon Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
2#yn r-,W. 1'72/,^^.7 =! 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
GNMA POOL#0438057 104.7852 18,607.220 17,662.33 19,497.61 0.00% 1,835.28
6.000%05/15/2028 DD 05/01/98
SEC ID:36207PTN9
GNMA POOL#0449851 105.5710 22,997.800 24,031.96 24,173.44 0.01% 141.48
6.500%01/15/2028 DD 01/01/98
SEC ID: 36208FWLO
GNMA POOL#0457814 104.7227 36,944.460 35,068.36 38,689.22 0.01% 3,620.86
6.000% 10/15/2028 DD 10/01/98
SEC ID:36208QSB3
GNMA POOL#0465546 104.7227 458,238.470 434,968.55 479,879.51 0.10% 44,910.96
6.000%08/15/2028 DD 08/01/98
SEC ID: 36209AET3
GNMA POOL#0465555 104.7227 493,489.570 468,429.56 516,795.40 0.11% 48,365.84
6.000%09/15/2028 DD 09/01/98
SEC ID: 36209AE48
GNMA POOL#0466845 106.0352 67,274.690 70,606.89 71,334.83 0.01% 727.94
6.500%06/15/2028 DD 06/01/98
SEC ID: 36209BTA6
GNMA POOL#0467279 104.7227 20,617.140 19,570.18 21,590.82 0.00% 2,020.64
6.000% 10/15/2028 DD 10/01/98
SEC ID:36209CCQ7
GNMA POOL#0467286 104.7227 397,524.450 377,337.66 416,298.18 0.09% 38,960.52
6.000% 10/15/2028 DD 10/01/98
SEC ID:36209CCX2
GNMA POOL#0468052 106.0352 113,362.740 118,977.74 120,204.36 0.03% 1,226.62
6.500%07/15/2028 DD 07/01/98
SEC ID:36209C5M4
GNMA POOL 00468330 104.7227 18,836.700 17,880.13 19,726.29 0.000/0 1,846.16
6.000%05/15/2028 DD 05/01/98
SEC ID: 36209DHF4
GNMA POOL#0468339 104.7227 304,340.620 288,885.84 318,713.59 0.07% 29,827.75
6.000%08/15/2028 DD 08/01/98
SEC ID:36209DHQO
GNMA POOL#0469688 104.7227 15,442.660 14,658.45 16,171.96 0.00% 1,513.51
6.000% 11/15/2028 DD 11/01/98
SEC ID:36209EXR8
GNMA POOL#0476041 106.0352 185,221.570 194,106.42 196,399.99 0.04% 2,293.57
6.500%06/15/2028 DD 06/01/98
SEC ID:36209MZE7
GNMA POOL#0478626 105.9414 164,0-68.790 171,938.97 173,816.79 0.04% 1,877.82
6.500%01/15/2029 DD 01/01/99
SEC ID: 36209QVT9
21612004 1:42:04PM PST 12 Workbench
• n
Asset Detail Report ID: GL8013'
/ Base currency: USD
Mellon
by Currency Alternate Base Currency:
Exchange Rate:
2&OE[&2112/,❑»0 D 1/31/2004 status: FINAL
Net Unrealized
Price Cost Market Value % of (fain/Loss
Description Base Shares Par Base Base Total Base..
GNMA POOL#0480598 106.0352 122,999.510 128,899.65 130,422.73 0.03% 1,523.08
6.500% 10/15/2028 DD 10/01/98
SEC ID: 36209S3F6
GNMA POOL#0483452 104.7227 13,171.180 12,502.34 13,793.21 0.00% 1,290.87
6.000%09/15/2028 DD 09/01/98
SEC ID: 36209WBV3
GNMA POOL#0485527 105.8164 435,166.850 456,721.21 460,477.94 0.10% 3,756.73
6.500%06/15/2031 DD 06/01/01
SEC ID: 36209YLG 1
GNMA POOL#0485610 105.8164 490,736.100 515,042.87 519,279.32 0.11% 4,236.45
6.500%07/15/2031 DD 07/01/01
SEC ID:36209YN38
GNMA POOL#0485682 105.8164 97,203.300 102,017.90 102,857.04 0.02% 839.14
6.500%08/15/2031 DD 08/01/01
SEC ID: 36209YRB6
GNMA POOL#0485703 105.8164 88,984.950 93,392.49 94,160.68 0.02% 768.19
6.500%08/15/2031 DD 08/01/01
SEC ID: 36209YRY6
GNMA POOL#0486720 104.7227 12,077.300 11,464.01 12,647.67 0.00% 1,183.66
6.0001/6 12/15/2028 DD 12/01/98
SEC ID:36210AVM6
GNMA POOL#0491103 104.7227 105,963.240 100,582.31 110,967.52 0.02% 10,385.21
6.000%01/15/2029 DD 01/01/99
SEC ID: 36210FRY4
GNMA POOL#0496461 104.7227 410,770.390 389,910.95 430,169.68 0.09% 40,258.73
6.000%01/15/2029 DD 01/01/99
SEC ID:36210MQN4
GNMA POOL#0497343 104.7227 22,500.340 21,357.75 23,562.95 0.000/0 2,205.20
6.000% 12/15/2028 DD 12/01/98
SEC ID:362IONP45
GNMA POOL#0499153 104.7227 12,651.900 12,009.42 13,249.41 0.00% 1,239.99
6.000%02/15/2029 DD 02/01/99
SEC ID: 36210QQE5
GNMA POOL#0500917 104.7227 7,3 16.300 6,944.76 7,661.82 0.00% 717.06
6.000%04/15/2029 DD 04/01/99
SEC ID: 36210SPAO
GNMA POOL#0503388 104.7227 311,751.240 295,920.12 326,474.19 0.07% 30,554.07
6.000%03/15/2029 DD 03/01/99
SEC ID:3621OVF55
GNMA POOL#0506636 104.7227 35,337.840 33,543.33 37,006.73 0.01% 3,463.40
6.000%04/15/2029 DD 04/01/99
SEC ID: 3621OYY90
21612004 1:42:04PM PST 13 Workbench
Asset Detail Report ID: GL8013
/ Mellon Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
26!7-r&2172/,^7272-1 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of gain/Loss
Description Base Shares Par Base Base Total Base
GNMA POOL#0512235 105.9414 10,919.140 11,459.97 11,567.89 0.00% 107.92
6.500% 11/15/2029 DD 11/01/99
SEC ID: 36211GBC6
GNMA POOL#0514326 105.9414 149.132.180 156,285.86 157,992.73 0.03% 1,706.87
6.500%07/15/2029 DD 07/01/99
SEC ID: 36211JLF2
GNMA POOL#0530053 105.4491 48,1 17.930 50,501.28 50,739.95 0.01% 238.67
6.500%04/15/2031 DD 04/01/01
SEC ID: 36212CZS3
GNMA POOL#0537885 105.8164 104,930.700 110,128.04 111,033.90 0.02% 905.86
6.500%02/15/2031 DD 02/01/01
SEC ID:36212MRE1
GNMA POOL#0547512 105.8164 12,796.480 13,430.31 13,540.78 0.000/0 110.47
6.500%04/15/2031 DD 04/01/01
SEC ID:36212YGV9
GNMA POOL#0547715 105.8164 128,171.500 134,319.73 135,626.48 0.03% 1,306.75
6.500%02/15/2031 DD 02/01/01
SEC ID: 36212YN82
GNMA POOL#0552322 105.8164 73,1 14.910 76,736.38 77,367.57 0.02% 631.19
6.500%01/15/2032 DD 01/01/02
SEC ID:36213ESK3
GNMA POOL#0552466 105.4652 539,265.430 565,975.93 568,737.50 0.12% 2,761.57
6.500%03/15/2032 DD 03/01/02
SEC ID:36213EW36
GNMA POOL#0552659 105.8164 437,1 13.670 458,764.44 462,537.99 0.10% 3,773.55
6.500%07/15/2032 DD 07/01/02
SEC ID: 36213E5U6
GNMA POOL#0561017 105.8164 437,479,710 459,148.62 462,925.32 0.10% 3,776.70
6.5001/6 07/15/2031 DD 07/01/01
SEC ID:36213QG29
GNMA II POOL#0080023 102.5163 221,394.240 225,061.08 226,965.07 0.05% 1,903.99
VAR RT 12/20/2026 DD 12/01/96
SEC ID:36225CAZ9
GNMA H POOL#080088M 101.5530 327,492.790 334,656.69 332,578.75 0.07% -2,077.94
7.375%06/20/2027 DD 06/01/97
SEC ID: 36225CC20
GNMA 11 POOL#0080395 101.4494 268,285.730 265,854.39 272,174.13 0.06% 6,319.74
VAR RT 04/20/2030 DD 04/01/00
SEC ID:36225CNM4
GNMA II POOL#080408X 101.4501 2,393,819.270 2,369,507.04 2,428,530.85 0.51% 59,023.81
6.500%05/20/2030 DD 05/01/00
SEC ID:36225CN28
21612004 1:42.04PM PST 14 Workbench
Asset Detail Report m: OLS013
Base Currency.
/ Mellon by Currency
Alternate Base Currency: USD
Exchange Rate:
2&7! W. 1-12/,rn7-7n 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
GENERAL ELEC CAP MTN HTR 00448 101.5000 180,000.000 183,801.60 182,700.00 0.04% -1,101.60
7.250%05/03/2004 DD 05/01/00
SEC ID: 36962GUR3
GENERAL ELEC CAP MTN NTR 00545 100.0620 1,000,000.000 1,001,089.00 1,000,620.00 0.21% -469.00
VAR RT 05/20/2004 DD 05/20/02
SEC ID:36962GYS7
GENERAL ELEC CAP MTN NTR 00575 105.1560 5,000,000.000 5,203,500.00 5,257,800.00 1.10% 54,300.00
5.450%01/15/2013 DD 12/06/02
SEC ID:36962GZY3
GENERAL MTRS ACCEP CORP SR NT 106.5780 3,000,000.000 3,064,350.00 3,197,340.00 0.67% 132,990.00
6.125%08/28/2007 DD 08/29/02
SEC ID:370425SD3
GOLDMAN SACHS GROUP INC SR NT 102.8430 3,000,000.000 3,030,030.00 3,085,290.00 0.64% 55,260.00
4.125%01/15/2008 DD 01/13/03
SEC ID:38141GCS1
GNMA GTD REMIC TR 2000-9 FH 100.6040 699,738.880 699,738.88 703,965.30 0.15% 4,226.42
VAR RT 02/16/2030
SEC ID:3837H4NX9
HOUSEHOLD FIN CORP NT 11 1.3430 1,635,000.000 1,772,820.00 1,820,458.05 0.38% 47,638.05
6.375% 10/15/2011 DD 10/23/01
SEC ID:441812JW5
JP MORGAN CHASE&CO SUB NT 107.1090 3,000,0.00.000 3,127,260.00 3,213,270.00 0.67% 86,010.00
5.750%01/02/2013 DD 11/25/02
SEC ID:46625HAT7
LEHMAN BROS HLDGS INC 100.8750 1..000,0.00.000 1,045,590.00 1,008,750.00 0.21% -36,840.00
6.625%04/01/2004 DD 03/26/99
SEC ID: 524908BZ2
MARSH&MCLENNAN COS INC SR NT 101.9210 2,.000,0-00.000 1,992,280.00 2,038,420.00 0.42% 46,140.00
6.625%06/15/2004 DD 06/14/99
SEC ID: 571748AB8
MORGAN STANLEY NT 100.5620 3,200,000.000 3,195,648.00 3,217,984.00 0.67% 22,336.00
3.625%04/01/2008 DD 03/06/03
SEC ID:617446HW2
NCNB TEX NATL BK DALLAS TEX NT 102.6090 250,000.000 260,870.00 256,522.50 0.05% -4,347.50
9.500%06/01/2004 DD 06/01/89
SEC ID:628857DJ0
NATIONAL RURAL UTILS COOP FIN 117.5620 3,000,000.000 3,465,480.00 3,526,860.00 0.74% 61,380.00
7.250%03/01/2012 DD 03/07/02
SEC ID:637432CU7
NATIONSBANK CORP SR NTS 102.1560 627,000.000 646,650.18 640,518.12 0.13% -6,132.06
6.125%07/15/2004 DD 07/23/98
SEC ID:638585BJ7
21612004 1:42:04PM PSI' 15 Workbench
Asset Detail Report W: GL8013
Base Currency: USD
/ Mellon by Currency Alternate Base Currency:
2&DC:,C 22102/,D07DD 1 31 2004 Exchange Rate:
Status: FINAL.
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
NORWEST FINL INC NTS 100.9370 520,000.000 531,538.80 524,872.40 0.11% -6,666.40
7.200%04/01/2004 DD 04/07/97
SEC ID:669383DG3
PACIFICORP SECD MTN NTR 00115 103.9840 3,000,000.000 2,950,530.00 3,119,520.00 0.65% 168,990.00
7.300% 10/22/2004 DD 10/22/92
SEC ID:69512EEU5
PHILIP MORRIS COS INC NTS 101.0930 1,000,000.000 1,052,600.00 1,010,930.00 0.21% -41,670.00
7.500%04/01/2004 DD 04/01/97
SEC ID: 718154CH8
RESIDENTIAL ASSET 03-RSII AIIB 99.8750 984,505.700 984,505.70 983,275.07 0.20% -1,230.63
VAR RT 12/25/2033 DD 12/30/03
SEC ID:760985K83
SBA GTD DEV PARTN 2001-20C 1 108.4650 3,497,276.280 3,497,276.28 3,793,320.72 0.79% 296,044.44
6.340%03/01/2021
SEC ID:83162CWO
SBA GTD PARTN CTFS SBIC-PS 01 107.0200 2,425,788.580 2,425,788.58 2,596,078.94 0.54% 170,290.36
6.640%02/10/2011 DD 02/21/01
SEC ID:831641 DD4
UNITED AIRLS PASSTHRU 0 1-1 C 18.1050 1,600,0-00.000 1,600,000.00 289,680.00 0.06% -1,310.320.00
6.831%03/01/2010 DD 08/22/01
SEC ID:909317BC2
US BANCORP MTN #TR 00119 101.3280 1.,000,000.000 1,046,310.00 1,013,280.00 0.21% -33,030.00
6.000%05/15/2004 DD 05/10/99
SEC ID:91159HEY2
U S TREASURY NOTES 111.3750 20..000,000.000 22,620,312.50 22,275,000.00 4.64% -345,312.50
06.250%02/15/2007 DD 02/15/97
SEC ID:9128272JO
US TREASURY INFLATION INDEX NT 108.8440 16.,304,540.000 14,384,422.02 17,746,513.52 3.70% 3,362,091.50
3.375%01/15/2007 DD 01/15/97
SEC ID:9128272M3
US TREASURY INFLATION INDEX NT 111.2815 3,.426,390.000 3,736,244.03 3,812,938.19 0.79% 76,694.16
3.625%01/15/2008 DD 01/15/98
SEC ID:9128273T7
US TREASURY INFLATION INDEX NT 113.9065 14„626,300.000 16,253,51 1.35 16,660,306.41 3.47% 406,795.06
3.875%01/15/2009 DD 01/15/99
SEC ID:9128274Y5
U S TREASURY NOTES 107.1250 57,.100,0.00.000 62,782,901.47 61,168,375.00 12.75% -1,614,526.47
05.750% 11/15/2005 DD 11/15/00
SEC ID:9128276N7
U S TREASURY NT 101.0300 12,.000,000.000 11,870,156.25 12,123,600.00 2.53% 253,443.75
3.250%08/15/2008 DD 08/15/03
SEC ID:912828BG4
21612004 1:42:04PM PST 16 Workbench
Asset Detail Report ID: 01,8013-
/ Mellon Base Currency: USD
by Currency Alternate Base Currency:
Exchange Rate:
2&- `&2 102/,0070 0 1/31/2004 Status: FINAL
Net Unrealized
Price Cost Market Value % of Gain/Loss
Description Base Shares Par Base Base Total Base
VERIZON GLOBAL FDG CORP GLOBAL 116.5780 3,000,000.000 3,530,490.00 3,497,340.00 0.73% -33,150.00
7.375%09/01/2012 DD 08/26/02
SEC ID: 92344GAT3
VIRGINIA ELEC&PWR 01 SERA 106.9680 1,750,000.000 1,743,840.00 1,871,940.00 0.39% 128,100.00
5.750%03/31/2006 DD 03/27/01
SEC ID: 927804ENO
WELLS FARGO&CO NEW NT 102.3590 125,000.000 128,605.00 127,948.75 0.03% -656.25
6.625%07/15/2004 DD 07/28/99
SEC ID: 949746AA9
TOTAL FIXED INCOME SECURITIES 289,998,622.940 302,786,255.57 307,180,815.98 64.03% 4,394,560.41
TOTAL ASSETS U.S. DOLLAR 462,121,8 16.460 475,369,827.74 479,764,388.15 100.00% 4,394,560.41
TOTAL ASSETS-BASE: 462,121,816.460 475,369,827.74 479,764,388.15 100.00% 4,394,560.41
21612004 1:42:04PM PST 17 Workbench
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED -OCSG00010000 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
PURCHASES
CASH &CASH EQUIVALENTS
U.S. DOLLAR
B DU PONT DE NEMOUR DISC 03/08/2004 1/20/2004 99.8667 4,500,000.000 4,494,000.00 -4,494,000.00 0.00
SEC ID:26354AC85 1/20/2004
BROKER: CREDIT SUISSE FIRST BOSTON 1/20/2004
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC N MAT 1/14/2004 99.7485 900,000.000 897,736.38 -897,736.38 0.00
04/14/2004 1/14/2004
SEC ID:313384VP1 1/14/2004
BROKER: GOLDMAN SACHS&CO, NY
OCSF07522202:LONG TERM OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC N MAT 1/15/2004 99.7513 10,900,000.000 10,872,886.25 -10,872,886.25 0.00
04/14/2004 1/15/2004
SEC ID:313384VPI 1/15/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONG TERM OPER-PIMCO
B FEDERAL HOME LN BK CONS DISC N MAT 1/28/2004 99.7460 900,000.000 897,713.63 -897,713.63 0.00
04/28/2004 1/28/2004
SEC ID:313384WD7 1/28/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONGTERM OPER-PIMCO
B FEDERAL HOME LN MTG CORP DISC MAT 1/15/2004 99.7528 10,000,000.000 9,975,277.78 -9,975,277.78 0.00
04/13/2004 1/15/2004
SEC ID:313396VNO 1/15/2004
BROKER: GOLDMAN SACHS&CO, NY
OCSF07522202:LONG TERM OPER-PIMCO
B FEDERAL HOME LN MTG CORP DISC MAT 1/20/2004 99.7472 1,700,000.000 1,695,702.78 -1,695,702.78 0.00
04/20/2004 1/20/2004
SEC ID:313396VV2 1/20/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 1 Workbench
Transaction Detail Report ID: EWBO09'
/ Mellon Reported by Transaction Category Base Currency: USD
OCSDCONSOLIDATED1111,2761-InO-lnnnnn 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Trait Settle Date Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
B FEDERAL HOME LN MTG CORP DISC MAT 1/29/2004 99.7478 1,200,000.000 1,196,974.00 -1,196,974.00 0.00
04/27/2004 1/29/2004
SEC ID:313396WC3 1/29/2004
BROKER: MERRILL LYNCH PIERCE FENNER
SMITH INC NY
OCSF07522202:LONG TERM OPER-PIMCO
B GENERAL ELEC CAP DISC 02/24/2004 1/20/2004 99.9018 2,500,000.000 2,497,545.14 -2,497,545.14 0.00
SEC ID:36959HBQ9 1/20/2004
BROKER: LEHMAN GOVT SECS INC, NY 1/20/2004
OCSF07511102:LIQUID OPER-PIMCO
B LEHMAN CAT REPO 00.990%01/05/2004 DD 1/2/2004 100.0000 8,400,000.000 8,400,000.00 -8,400,000.00 0.00
01/02/04 1/2/2004
SEC ID:99414P783 1/2/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
B LEHMAN CAT REPO 00.980%01/06/2004 DD 1/5/2004 100.0000 8,300,000.000 8,300,000.00 -8,300,000.00 0.00
01/05/04 1/5/2004
SEC ID:99414R318 1/5/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.950%01/07/2004 1/6/2004 100.0000 8,400,000.000 8,400,000.00 -8,400,000.00 0.00
DD 01/06/04 1/6/2004
SEC ID:99414S423 1/6/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.940%01/08/2004 1/7/2004 100.0000 8,400,000.000 8,400,000.00 -8,400,000.00 0.00
DD 01/07/04 1/7/2004
SEC ID:99414T884 1/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
B LEHMAN CAT 2 REPO 00.950%01/09/2004DD 1/8/2004 100.0000 8,400,000,000 8.400,000.00 -8,400,000.00 0.00
01/08/04 1/8/2004
SEC ID:99414V673 1/8/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
2/6/2004 1:44:31 PM PST 2 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D-12i276110C170C3 IL113 1/2/2004 - 1/30/2004 Status: FINAL,
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
Tyle Description Reported Date Base Shares/Par Base Base Base
B CREDIT SUISSE FB REPO 00.920%01/12/2004 1/9/2004 100.0000 8,400,000.000 8,400,000.00 -8,400,000.00 0.00
DD 01/09/04 1/9/2004
SEC ID:99414W986
BROKER: CREDIT SUISSE FIRST BOSTON 1/9/2004
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
g CREDIT SUISSE FB REPO 00.970%01/13/2004 1/12/2004 100.0000 4,200,000.000 4,200,000.00 -4,200,000.00 0.00
DD 01/12/04 1/12/2004
SEC ID:99414X547 1/12/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
B LEHMAN CAT 2 REPO 00.970%01/13/2004 DD 1/12/2004 100.0000 4,200,000.000 4,200,000.00 -4,200,000.00 0.00
01/12/04 1/12/2004
SEC ID:99414Y396 1/12/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
g LEHMAN CAT 2 REPO 00.950%01/14/2004 DD 1/13/2004 100.0000 9,900,000.000 9,900,000.00 -9,900,000.00 0.00
01/13/04 1/13/2004
SEC ID:99414Z807 1/13/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
$ LEHMAN CAT 2 REPO 00.950%01/15/2004 DD 1/14/2004 100.0000 9,900,000.000 9,900,000.00 -9,900,000.00 0.00
01/14/04 1/14/2004
SEC ID:99415B221 1/14/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
B LEHMAN CAT 2 REPO 00.990%01/16/2004 DD 1/15/2004 100.0000 9,900,000.000 9,900,000.00 -9,900,000.00 0.00
01/15/04 1/15/2004
SEC ID:9941SC849 1/15/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
B LEHMAN CAT REPO 00.970%01/20/2004 DD 1/16/2004 100,0000 9,900,000.000 9,900,000.00 -9,900,000.00 0.00
01/16/04 1/16/2004
SEC ID:99415D789 1/16/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
21612004 1:44:31PM PST 3 Workbench.
Transaction Detail Report tD: EWB009 '
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED`H���6CJCII7700i1C]❑ 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
B LEHMAN CAT REPO 00.960%01/21/2004 DD 1/20/2004 100.0000 900,000.000 900,000.00 -900,000.00 0.00
01/20/04 1/20/2004
SEC ID:99415F677
BROKER: LEHMAN GOUT SECS INC, NY 1/20/2004
OCSF0751 1102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.970%01/22/2004 1/21/2004 100.0000 8,100,000.000 8,100,000.00 -8,100,000.00 0.00
DD 01/21/04 1/21/2004
SEC ID:99415G857
BROKER: CREDIT SUISSE FIRST BOSTON 1/21/2004
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.980%01/23/2004 1/22/2004 100.0000 8,200,000.000 8,200,000.00 -8,200,000.00 0.00
DD 01/22/04 1/22/2004
SEC ID:9941SJ547 1/22/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,NY
OCSF0751 1102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.960%01/26/2004 1/23/2004 100.0000 9,500,000.000 9,500,000.00 -9,500,000.00 0.00
DD 01/23/04 1/23/2004
SEC ID:99415J760 1/23/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.980%01/27/2004 1/26/2004 100,0000 9,500,000.000 9,500,000.00 -9,500,000.00 0.00
DD 01/26/04 1/26/2004
SEC ID:99415L286 1/26/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.980%01/28/2004 1/27/2004 100.0000 9,500,000.000 9,500,000.00 -9,500,000.00 0.00
DD 01/27/04 1/27/2004
SEC ID:99415M763 1/27/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,NY
OCSF07511102:LIQUID OPER-PIMCO
B CREDIT SUISSE FB REPO 00.9900/.01/29/2004 1/28/2004 100.0000 9,500,000.000 9,500,000.00 -9,500,000.00 0.00
DD 01/28/04 1/28/2004
SEC ID:99415P154 1/28/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
21612004 1:44:31 PM PST 4 Workbench
Transaction Detail Report m: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D3IIi2.767C]l-,,-0L111Ili 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
B CREDIT SUISSE FB REPO 00.980%01/30/2004 1/29/2004 100.0000 9,500,000.000 9,500,000.00 -9,500,000.00 0.00
DD 01/29/04 1/29/2004
SECID:99415Q699 1/29/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
B FIRST BOSTON CORP REPO 00.970% 1/30/2004 100.0000 9,500,000.000 9,500,000.00 -9,500,000.00 0.00
02/02/2004 DD 01/30/04 1/30/2004
SEC ID:99415T115 1/30/2004
BROKER:CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
B DREYFUS TREASURY CASH MGMT 1/2/2004 1.0000 86,250.250 86,250.25 -86,250.25 0.00
SEC ID:996085247 1/2/2004
OCSF07522202:LONGTERM OPER-P1MC0 1/2/2004
B DREYFUS TREASURY CASH MGMT 1/2/2004 1.0000 8,402,037.000 8,402,037.00 -8,402,037.00 0.00
SEC ID:996085247 1/2/2004
OCSF0751 1102:LIQUID OPER-PIMCO 1/2/2004
B DREYFUS TREASURY CASH MGMT 1/5/2004 1.0000 352.190 352.19 -352.19 0.00
SEC ID:996085247 1/5/2004
OCSF07522202:LONG TERM OPER-PIMCO 1/5/2004
B DREYFUS TREASURY CASH MGMT 1/6/2004 1.0000 6,686.300 6,686.30 -6,686.30 0.00
SEC ID:996085247 1/6/2004
OCSF07522202:LONG TERM OPER-PIMCO 1/6/2004
B DREYFUS TREASURY CASH MGMT 1/7/2004 1.0000 221.670 221.67 -221.67 0.00
SEC ID:996085247 1/7/2004
OCSF0751 1102:LIQUID OPER-PIMCO 1/7/2004
B DREYFUS TREASURY CASH MGMT 1/8/2004 1.0000 219.330 219.33 -219.33 0.00
SEC ID:996085247 1/8/2004
OCSF0751 1102:LIQUID OPER-PIMCO 1/8/2004
B DREYFUS TREASURY CASH MGMT 1/9/2004 1.0000 221.670 221.67 -221.67 0.00
SEC ID:996085247 1/9/2004
OCSF0751 1102:LIQUID OPER-PIMCO 1/9/2004
21612004 1:44:31 P114 PST 5 Workbench
Transaction Detail LIEWBOo9
/ Mellon Reported by Transaction Category BasUSDOCSD-CONSOLIDATED-IF-2-161u1t"!.:I('1fi'lill! 1/2/2004 - 1/30/2004FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
T'Pe Description Reported Date Base Shares/Par Base Base Base
B DREYFUS TREASURY CASH MGMT 1/12/2004 1.0000 644.000 644.00 -644.00 0.00
SEC ID:996085247 1/12/2004
OCSF07511102:LIQUID OPER-PIMCO 1/12/2004
B DREYFUS TREASURY CASH MGMT 1/13/2004 1.0000 1,742.170 1,742.17 -1,742.17 0.00
SEC ID:996085247 1/13/2004
OCSF07511102:LIQUID OPER-PIMCO 1/13/2004
B DREYFUS TREASURY CASH MGMT 1/14/2004 1.0000 261.250 261.25 -261.25 0.00
SEC ID:996085247 1/14/2004
OCSF07511102:LIQUID OPER-PIMCO 1/14/2004
B DREYFUS TREASURY CASH MGMT 1/15/2004 1.0000 23,603.760 23,603.76 -23,603.76 0.00
SEC ID:996085247 1/15/2004
OCSF07511102:LIQUID OPER-PIMCO 1/15/2004
B DREYFUS TREASURY CASH MGMT 1/15/2004 1.0000 1,531,925.820 1,531,925.82 -1,531,925.82 0.00
SEC ID:996085247 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO 1/15/2004
B DREYFUS TREASURY CASH MGMT 1/16/2004 1.0000 272.250 272.25 -272.25 0.00
SEC ID:996085247 1/16/2004
OCSF07511102:LIQUID OPER-PIMCO 1/16/2004
B DREYFUS TREASURY CASH MGMT 1/16/2004 1.0000 28,071.920 28,071.92 -28,071.92 0.00
SEC ID:996085247 1/16/2004
OCSF07522202:LONG TERM OPER-PIMCO 1/16/2004
B DREYFUS TREASURY CASH MGMT 1/20/2004 1.0000 2,010,543.910 2,010,543.91 -2,010,543.91 0.00
SEC ID:996085247 1/20/2004
OCSF07511102:LIQUID OPER-P1MCO 1/20/2004
B DREYFUS TREASURY CASH MGMT 1/21/2004 1.0000 22.010 22.01 -22.01 0.00
SEC ID:996085247 1/21/2004
OCSF07522202:LONGTERM OPER-PIMCO 1/21/2004
B DREYFUS TREASURY CASH MGMT 1/22/2004 1.0000 367.740 367.74 -367.74 0.00
SEC ID:996085247 1/22/2004
OCSF07522202:LONG TERM OPER-PIMCO 1/22/2004
2/6/2004 1:44:3I PM PST 6 Workbench
Wig agXsoM ' L LScf IMfV 66-I vv�c i7.
00'0 ZI'6Z£'ZIT'9IZ- ZT'6Z£'ZTT'8IZ 09VC6Vt ST'8IZ -dV'I'IOa 'S'n S,Lx3'1VAIn63 HSVO 99 HSVO'IVIOX
boor,/06/I 00Wid-asd0 QInbn:ZOT I ismdsOO
b00Z/0£/T b60L80966:a103S
00.0 00.000'I- 00.000'1 000.000'T 0000'T b00Z/OE/I L00V.L1SOdsa A3NOW 3.LV'I-.Luse H
b00Z/0£/T 00W1d-21SdO alnan:ZOI I ismaO0
b00Z/0£/I LbZ980966:a1021S
00.0 19.8SZ- 19.8SZ 019.89Z 0000-1 b00Z/0£/I .LWOWHSVOA21nsvas.LsndAsaa S
b00Z/66/1 00WId-2I2dO WZIS.L0N0'I:Z0ZZZSL0ASOO
b00Z/6Z/1 LbZS80966:QI03S
00'0 LO'bSZ'61- LO-bSZ'61 OLO-bSZ'61 0000"1 VOOZ/6Z/I .LWOW HSVO A21nSVSSI Sn3A38G 13
b00Z/6Z/1 00WId-NSd0 ulndll:ZOT I ISLOAS00
VOOZ/6Z/T LKS80966:uI 03S
00.0 SZ-19r,- SZ-I9Z 0SZ-I9Z 0000-I b00Z/6Z/1 Lwow HSVO A2InSVmu sagAasu E
vooZ/8Z/T 00WId-21SdOalnal'1:ZOTIiSLOAS00
b00Z/8Z/1 LKS80966:01 03S
00'0 19.8Sr,- 19.89Z 019.89Z 0000-1 b00Z/SZ/i IWOW HSVO Asnsnu sfisnba H
b00Z/LZ/I 00Wl d-S3dO a 1na1'I:ZOT I I SLOdS00
b00Z/LZ/I LbZ980966:QI03S
00'0 I9.89Z- 19'89Z 019.85;r, 0000-I b00Z/LZ/I .LWOW HSVO AHnSVSSL SngASHCI a
b00Z/9Z/I 00WId-SSd0 WZ181 0N0'I:ZOZZZSL0dS00
b00Z/9r,/I LbZ980966:QI33S
00.0 SL'800'968- SL'800'908 0SL-800'968 0000,1 boor,/9r,/I .LWOWHSV0AsnSV82LLSndAsMa e
b00Z/96/I 00Wld-S:RdO ulnbl'I:ZOT T ISLOSS30
VOOZ/901 417ZS90966=a100S
00.0 00.09L- 00.09L 000'09L 0000-1 b00Z/9Z/T .LWOW HSVO Asnsvau Sn3AZ21a a
b00Z/£Z/i 00Wld-213d0alnal'I:Z0TIISLOdS00
b00Z/Sr,/I Lbr,S80966:010:RS
00.0 ZZ'£L9'98- ZZ-£L9'98 OZZ'£L9'98 0000'1 b00Z/£Z/i .LWOWHSVOAansvamisnAAssc e
boor,/Er,/T 00WId-S dO WH3IONCn:Z0ZZZSL0.gS00
b00Z/EZ/I 4tZ980966:a102S
00.0 08.9I£'9£- 08.9I£'9£ 008.91£'9£ 0000-I boOZ/£Z/I ,LWJW HSVO A21nSVgd.L SfldAZN(l $
ages asuff egg's JVd/saiugs asss a;Ba powdag "PdIsagaa adAl
Ml/9199:10M ;unouiV ;903 a0Pd a;Ba PP408
a�Ba aP�.L
'IVJlTI3 `$";B�s b00Z/OE/i - boor,/Z/I iJOCOOLUL)u9CZMEa3,LVQ110SN00-uSOO
asn :6auauno asag Ajo2ap3 uoj;alasuBjy Aq papodag U01jeW
600aMa :a1 podazl uu;aa uoi;ousuuiy
Transaction Detail Report ID: EWB069
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATEDIE2 7 611 111-1 01--FIFIIJ 1/2/2004 - 1/30/2004 Status: FINAL,
Trade Date
Tl Settle Date Price Cost Amount Net Gain/Loss
Tyt Description Reported Date Base Shares/Par Base Base Base
TOTAL CASH 8a CASH EQUIVALENTS BASE: 218,184,493.160 218,112,329.12 -218,112,329.12 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
B COMMIT TO PUR FNMA SF MTG 6.000% 1/7/2004 103.0938 1,000,000.000 1,030,937.50 -1,030,937.50 0.00
02/01/2034 DD 02/01/04 2/12/2004
SEC 1D:01P060626 1/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONGTERM OPER-PIMCO
13 COMMIT TO PUR FNMA SF MTG 6.000% 1/8/2004 103.1875 500,000.000 515,937.50 -515,937.50 0.00
02/01/2034 DD 02/01/04 2/12/2004
SEC ID:01F060626 1/8/2004
BROKER: CHASE/GREENWICH CAP,NEW
YORK
OCSF07522202:LONGTERM OPER-PIMCO
B COMMIT TO PUR FNMA SF MTG 6.000% 1/8/2004 103.2539 1,000,000.000 1,032,539.06 -1,032,539.06 0.00
02/01/2034 DD 02/01/04 2/12/2004
SEC ID:01F060626 1/8/2004
BROKER: GOLDMAN SACHS&CO, NY
OCSF07522202:LONG TERM OPER-PIMCO
B COMMIT TO PUR FNMA SF MTG 6.000% 1/12/2004 103.6563 500,000.000 518,281.25 -518,281.25 0.00
02/01/2034 DD 02/01/04 2/12/2004
SEC ID:01F060626 1/12/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONG TERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: 3,000,000.000 3,097,695.31 -3,097,695.31 0.00
TOTAL FIXED INCOME SECURITIES BASE: 3,000,000.000 3,097,695.31 -3,097,695.31 0.00
TOTAL PURCHASES BASE: 221,184,493.160 221,210,024.43 -221,210,024.43 0.00
SALES
CASH&CASH EQUIVALENTS
U.S. DOLLAR
1-aa•'�1 PM PST 8 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATE1331^2 f1rj ]LU_RIE 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
T3'Pe Description Reported Date Base Shares/Par Base Base Base
S CREDIT SUISSE FB REPO 00.970%01/02/2004 1/2/2004 100.0000 -8,400,000.000 -8,400,000.00 8,400,000.00 0.00
DD 12/24/03 1/2/2004
SEC ID:99414G593 1/2/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.970%01/02/2004 1/2/2004 100.0000 0.000 0.00 2,037.00 0.00
DD 12/24/03 1/2/2004
SEC ID:99414G593 1/2/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT REPO00.990%01/05/2004 DD 1/5/2004 100.0000 -8,400,000.000 -8,400,000.00 8,400,000.00 0.00
O1/02/04 1/5/2004
SEC ID:99414P783 1/5/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT REPO 00.990%01/05/2004 DD 1/5/2004 100.0000 0.000 0.00 693.00 0.00
01/02/04 1/5/2004
SEC ID:99414P783 1/5/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT REPO 00.980%01/06/2004 DD 1/6/2004 100.0000 -8,300.000.000 -8,300,000.00 8,300,000.00 0.00
01/05/04 1/6/2004
SEC ID:99414R318 1/6/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 00.980%01/06/2004 DD 1/6/2004 100.0000 0.000 0.00 225.94 0.00
O1/05/04 1/6/2004
SEC ID:99414R318 1/6/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.950%Ol/07/2004 1/7/2004 100.0000 -8,400.000.000 -8,400,000.00 8,400,000.00 0.00
DD 01/06/04 1/7/2004
SEC ID:994145423 1/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
2/6/2004 1:44:31 PM PST 9 Workbench
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DJU2❑6❑❑❑:1(JUJ L: 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net (fain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
IS CREDIT SUISSE FB REP000.950%01/07/2004 1/7/2004 100.0000 0.000 0.00 221.67 0.00
DD 01/06/04 1/7/2004
SEC ID:99414S423 1/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,NY
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.940%01/08/2004 1/8/2004 100.0000 -8,400,000.000 -8,400,000.00 8,400,000.00 0.00
DD 01/07/04 1/8/2004
SEC ID:99414T884 1/8/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.940%01/08/2004 1/8/2004 100.0000 0.000 0.00 219.33 0.00
DD 01/07/04 1/8/2004
SEC ID:99414T884 1/8/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT REPO 00.950%01/09/2004 DD 1/9/2004 100.0000 -8,400,000.000 -8,400,000.00 8,400,000.00 0.00
01/08/04 1/9/2004
SEC ID:99414V673 1/9/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 00.950%01/09/2004DD 1/9/2004 100.0000 0.000 0.00 221.67 0.00
01 08 04 /
1 9/2004
SEC ID:99414V673 1/9/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.920%01/12/2004 1/12/2004 100.0000 -8,400,000.000 -8,400,000.00 8,400,000.00 0.00
DD 01/09/04 1/12/2004
SEC ID:99414W986 1/12/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.920%01/12/2004 1/12/2004 100.0000 0.000 0.00 644.00 0.00
DD 01/09/04 1/12/2004
SEC ID:99414W986 1/12/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
2/6/2004 1:44:3I PM PST 10 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD�CONSOLI DATE D;7'12J6000 DOD J0❑ 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
S CREDIT SUISSE FB REPO 00.970%01/13/2004 1/13/2004 100.0000 -4,200,000.000 -4,200,000.00 4,200,000.00 0.00
DD 01/12/04 1/13/2004
SEC ID:99414X547 1/13/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF0751 1102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.970%01/13/2004 1/13/2004 100.0000 0.000 0.00 113.17 0.00
DD 01/12/04 1/13/2004
SEC ID:99414X547 1/13/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 00.970%01/13/2004 DD 1/13/2004 100.0000 -4,200,000.000 -4,200,000.00 4,200,000.00 0.00
O1/12/04 1/13/2004
SEC ID:99414Y396 1/13/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF0751 1102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 00.970%01/13/2004 DD 1/13/2004 100.0000 0.000 0.00 113.17 0.00
01/12/04 1/13/2004
SEC ID:99414Y396 1/13/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-P1MC0
S LEHMAN CAT 2 REPO 00.950%01/14/2004 DD 1/14/2004 100.0000 -9,900,000.000 -9,900,000.00 9,900,000.00 0.00
O1/13/04 1/14/2004
SEC ID:99414Z807 1/14/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 00.950%01/14/2004 DD 1/14/2004 100.0000 0.000 0.00 261.25 0.00
O1/13/04 1/14/2004
SEC ID:99414Z807 1/14/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT REPO 00.950%01/15/2004 DD 1/15/2004 100.0000 -9,900,000.000 -9,900,000.00 9,900,000.00 0.00
01/14/04 1/15/2004
SEC ID:9941513221 1/15/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF0751 1102:LIQUID OPER-PIMCO
21612004 1:44:31 PM PST 11 Workbench
Transaction Detail Report m: EWBb09 '
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D1112 :761.1UD.Ul.-Y-i1ll 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net slain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
is LEHMAN CAT 2 REPO 00.950%01/15/2004 DD 1/15/2004 100.0000 0.000 0.00 261.25 0.00
01/14/04 1/15/2004
SEC ID:9941SB221 1/15/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 00.990%01/16/2004 DD 1/16/2004 100.0000 -9,900,000.000 -9,900,000.00 9,900,000.00 0.00
01/15/04 1/16/2004
SEC ID:99415C849 1/16/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 00.990%01/16/2004 DD 1/16/2004 100.0000 0.000 0.00 272.25 0.00
01/15/04 1/16/2004
SEC ID:99415C849 1/16/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 00.970%01/20/2004 DD 1/20/2004 100.0000 -9,900,000.000 -9,900,000.00 9,900,000.00 0.00
01/16/04 1/20/2004
SEC ID:99415D789 1/20/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT 2 REPO 00.970%01/20/2004 DD 1/20/2004 100.0000 0.000 0.00 1,067.00 0.00
01/16/04 1/20/2004
SEC ID:9941513789 1/20/2004
BROKER: LEHMAN GOUT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S LEHMAN CAT 2 REPO 00.960%01/21/2004DD 1/21/2004 100.0000 -900,000.000 -900,000.00 900,000.00 0.00
01/20/04 1/21/2004
SEC ID:994ISF677 1/21/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
IS LEHMAN CAT REPO 00.960%01/21/2004 DD 1/21/2004 100.0000 0.000 0.00 24.00 0.00
01/20/04 1/21/2004
SEC ID:99415F677 1/21/2004
BROKER: LEHMAN GOVT SECS INC, NY
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSEFB REPO 00.970%01/22/2004 1/22/2004 100.0000 -8,100,000.000 -8,100,000.00 8,100,000.00 0.00
DD 01/21/04 1/22/2004
SEC ID:9941SG857 1/22/2004
BROKER:CREDIT SUISSE FIRST BOSTON
CORP,NY
OCSF07511102.LIQUID OPER-PIMCO
91612004 1:44:31 PM PST 12 Workbench
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency USD
OCSD-CONSOLI DATE DI 2 7116V)F-iJ1lt;71EII: 1/2/2004 - 1/30/2004 status: FINAL.
Trade Date
Tran settle Date Price Cost Amount Net Gain/Loss
T'Pe Description Reported Date Base Shares/Par Base Base Base
IS CREDIT SUISSE FB REPO 00.9700/.01/22/2004 1/22/2004 100.0000 0.000 0.00 218.25 0.00
DD 01/21/04 1/22/2004
SEC ID:99415G857 1/22/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.980%01/23/2004 1/23/2004 100.0000 -8,200,000,000 -8,200,000.00 8,200,000.00 0.00
DD 01/22/04 1/23/2004
SEC ID:99415J547 1/23/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.980%01/23/2004 1/23/2004 100.0000 0.000 0.00 223.22 0.00
DD 01/22/04 1/23/2004
SEC ID:99415J547 1/23/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.960%01/26/2004 1/26/2004 100.0000 -9,500,000.000 -9,500,000.00 9,500,000.00 0.00
DD 01/23/04 1/26/2004
SEC ID:99415J760 1/26/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-P1MCO
1S CREDIT SUISSE FB REPO 00.960%01/26/2004 1/26/2004 100.0000 0.000 0.00 760.00 0.00
DD 01/23/04 1/26/2004
SEC ID:99415J760 1/26/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.980%01/27/2004 1/27/2004 100.0000 -9,500,000.000 -9,500,000.00 9,500,000.00 0.00
DD 01/26/04 1/27/2004
SEC ID:99415L286 1/27/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-P1MCO
21612004 1:44:31PNI PST 13 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-00NS0LIDATED=2"I6rInn:,-In lflr] 1/2/2004 - 1/30/2004 Status: FINAL.
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
T'Pe Description Reported Date Base Shares/Par Base Base Base
IS CREDIT SUISSE FB REPO 00.980%01/27/2004 1/27/2004 100.0000 0.000 0.00 258.61 0.00
DD 01/26/04 1/27/2004
SEC ID:99415L286 1/27/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
0CSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.980%01/28/2004 1/28/2004 100.0000 -9,500,000.000 -9,500,000.00 9,500,000.00 0.00
DD 01/27/04 1/28/2004
SEC ID:99415M763 1/28/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.980%01/28/2004 1/28/2004 100.0000 0.000 0.00 258.61 0.00
DD 01/27/04 1/28/2004
SEC ID:99415M763 1/28/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.990%01/29/2004 1/29/2004 100.0000 -9,500,000.000 -9,500,000.00 9,500,000.00 0.00
DD 01/28/04 1/29/2004
SEC ID:994151`154 1/29/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.9909%01/29/2004 1/29/2004 100.0000 0.000 0.00 261.25 0.00
DD 01/28/04 1/29/2004
SEC ID:99415P154 1/29/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
S CREDIT SUISSE FB REPO 00.980%01/30/2004 1/30/2004 100.0000 -9,500,000.000 -9,500,000.00 9,500,000.00 0.00
DD 01/29/04 1/30/2004
SECID:99415Q699 1/30/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
IS CREDIT SUISSE FB REPO 00.980%01/30/2004 1/30/2004 100.0000 0.000 0.00 258.61 0.00
DD 01/29/04 1/30/2004
SECID:99415Q699 1/30/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07511102:LIQUID OPER-PIMCO
21612004 1:44:31 PM PST 14 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATED TT--2 tin 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
ETY; Description
Settle Date Price Cost Amount Net Gain/Loss
Reported Date Base Shares/Par Base Base Base
S DREYFUS TREASURY CASH MGMT 1/5/2004 1.0000 -8,298,145.260 -8,298,145.26 8,298,145.26 0.00
SEC ID:996085247 1/5/2004
OCSF07511102:LIQUID OPER-PIMCO 1/5/2004
S DREYFUS TREASURY CASH MGMT 1/6/2004 1.0000 -99,774.060 -99,774.06 99,774.06 0.00
SEC ID:996085247 1/6/2004
OCSF07511102:LIQUID OPER-P1MC0 1/6/2004
S DREYFUS TREASURY CASH MGMT 1/14/2004 1.0000 -56,131.950 -56,131.95 56,131.95 0.00
SEC ID:996085247 1/14/2004
OCSF07522202:LONG TERM OPER-P1MC0 1/14/2004
S DREYFUS TREASURY CASH MGMT 1/20/2004 1.0000 -1,582,522.900 -1,582,522.90 1,582,522.90 0.00
SEC ID:996085247 1/20/2004
OCSF07522202:LONGTERM OPER-PIMCO 1/20/2004
S DREYFUS TREASURY CASH MGMT 1/21/2004 1.0000 -1,999,976.000 -1,999,976.00 1,999,976.00 0.00
SEC ID:996085247 1/21/2004
OCSF07511102:LIQUID OPER-PIMCO 1/21/2004
S DREYFUS TREASURY CASH MGMT 1/22/2004 1.0000 -99,781.750 -99,781.75 99,781.75 0.00
SEC ID:996085247 1/22/2004
OCSF07511102:LIQUID OPER-PIMCO 1/22/2004
S DREYFUS TREASURY CASH MGMT 1/28/2004 1.0000 -897,713.630 -897,713.63 897,713.63 0.00
SEC ID:996085247 1/28/2004
OCSF07522202:LONG TERM OPER-PIMCO 1/28/2004
TOTAL CASH&CASH EQUIVALENTS U.S. DOLLAR: -184,434,045.550 -184,434,045.55 184,442,658.80 0.00
TOTAL CASH&CASH EQUIVALENTS BASE: -184,434,045.550 -184,434,045.55 184,442,658.80 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
S COMMIT TO PUR FNMA SFMTG 6.000% 1/7/2004 103.4336 -1,000,000.000 -1,027,562.50 1,034,335.93 6,773.43
01/01/2034 DD 0 1/01/04 1/14/2004
SEC ID:01F060618 1/7/2004
BROKER: CREDIT SUISSE FIRST BOSTON
CORP,N Y
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31 PM PST 15 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D17276r n lnnnn inr_i 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain; ss
TYPe Description Reported Date Base Shares/Par Base Base Base
S COMMIT TO PUR FNMA SF MTG 6.000% 1/8/2004 103.5391 -500,000.000 -513,781.25 517,695.31 3,914.06
01/01/2034 DD 01/01/04 1/14/2004
SEC ID:01F060618 1/8/2004
BROKER: CHASE/GREENWICH CAP,NEW
YORK
OCSF07522202:LONGTERM OPER-PIMCO
S COMMIT TO PUR FNMA SF MTG 6.000% 1/8/2004 103.6016 -1,000,000.000 -1,027,562.50 1,036,015.62 8,453.12
01/01/2034 DD 0 1/01/04 1/14/2004
SEC ID:01F060618 1/8/2004
BROKER: GOLDMAN SACHS&CO, NY
OCSF07522202:LONGTERM OPER-PIMCO
S FNMA POOLN0555528 6.000%04/01/2033 1/12/2004 104.0117 -744,687.690 -774,475.20 774,562.47 87.27
DD 05/01/03 1/14/2004
SECID:31385XD95 1/12/2004
BROKER: BEAR STEARNS&CO INC,NY
OCSF07522202:LONGTERM OPER-PIMCO
IS FNMA POOL#0555528 6.000%04/01/2033 1/12/2004 104.0117 0.000 0.00 1,613.49 0.00
DD 05/01/03 1/14/2004
SEC ID:31385XD95 1/12/2004
BROKER: BEAR STEARNS& CO INC,NY
OCSF07522202:LONG TERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: -3,244,687.690 -3,343,381.45 3,364,222.82 19,227.88
TOTAL FIXED INCOME SECURITIES BASE: -3,244,687.690 -3,343,381.45 3,364,222.82 19,227.88
TOTAL SALES BASE: -187,678,733.240 -187,777,427.00 187,806,881.62 19,227.88
PRINCIPAL PAYMENTS
FIXED INCOME SECURITIES
U.S. DOLLAR
PD GNMA GTD REMIC TR 2000-9 FH VAR RT 1/16/2004 100.0000 -25,900.060 -25,900.06 25,900.06 0.00
02/16/2030 1/16/2004
SEC ID:3837H4NX9 1/16/2004
OCSF07522202:LONGTERM OPER-PIMCO
PD RESIDENTIAL ASSET 03-RSI I AIIB VAR RT 1/25/2004 100.0000 -15,494.300 -15,494.30 15,494.30 0.00
12/25/2033 DD 12/30/03 1/25/2004
SEC ID:760985K83 1/25/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31 PM PST 16 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATEDCH12!.16L300DOLIDDLI 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: -41,394.360 -41,394.36 41,394.36 0.00
TOTAL FIXED INCOME SECURITIES 13ASE: -41,394.360 -41,394.36 41,394.36 0.00
TOTAL PRINCIPAL PAYMENTS BASE: -41,394.360 -41,394.36 41,394.36 0.00
MATURITIES
CASH&CASH EQUIVALENTS
U.S. DOLLAR
MT FEDERAL HOME LN MTG CORP DISC MAT 1/15/2004 100.0000 -20,800,000.000 -20,744,004.66 20,744,004.66 0.00
O1/15/2004 1/15/2004
SEC ID:313396RV7 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
MT FEDERAL HOME LN MTG CORP DISC MAT 1/21/2004 100.0000 -5,200,000.000 -5,195,138.00 5,195,138.00 0.00
01/21/2004 1/21/2004
SEC ID:313396SBO 1/21/2004
OCSF07511102:LIQUID OPER-PIMCO
MT FEDERAL HOME LN MTG CORP DISC MAT 1/29/2004 100.0000 -1,200,000.000 -1,196,718.67 1,196,718.67 0.00
01/29/2004 1/29/2004
SEC ID:313396SKO 1/29/2004
OCSF07522202:LONG TERM OPER-PIMCO
MT WELLS FARGO BANK NA INSTL C/D 1.070% 1/13/2004 100.0000 -1,500,000.000 -1,500,000.00 1,500,000.00 0.00
01/13/2004DD 12/10/03 1/13/2004
SEC ID:94975U2V8 1/13/2004
OCSF07511102:LIQUID OPER-PIMCO
TOTAL CASH & CASH EQUIVALENTS U.S. DOLLAR: -28,700,000.000 -28,635,861.33 28,635,861.33 0.00
TOTAL CASH&CASH EQUIVALENTS BASE: -28,700,000.000 -28,635,861.33 28,635,861.33 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
MT FEDERAL FARM CR BKS CONS SYSTE 6.40% 1/23/2004 100.0000 -1,350,000.000 -1,399,963.50 1,350,000.00 -49,963.50
01/23/2004 DD 01/01/1999 1/23/2004
SEC ID:31331H6G7 1/23/2004
OCSF07511102:LIQUID OPER-PIMCO
21612004 1:44:31PM PST 17 Wgrkbench
Transaction Detail Report ID: EWBO09
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATEDrnU72 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
TOTAL MATURITIES BASE: -30,050,000.000 -30,035,824.83 29,985,861.33 -49,963.50
CORPORATE ACTIONS
FIXED INCOME SECURITIES
U.S. DOLLAR
CD PAID ASA RESULT OFACONSENT 1/30/2004 0.000 1,000.00 1,000.00 1,000.00
SOLICITATION
SEC ID:046003KA6 1/30/2004
OCSF07511102:LIQUID OPER-P1MCO
MISCELLANEOUS ACTIVITY
FIXED INCOME SECURITIES
U.S. DOLLAR
SW TO BRING ACCOUNT INTO BALANCE US 1/29/2004 -43,400.000 -38,288.96 0.00 -38,288.96
TREASURY INFLATION INDEX NT 1/30/2004
SEC ID:9128272M3
OCSF07522202:LONG TERM OPER-PIMCO 1/29/2004
SW TO BRING ACCOUNT INTO BALANCE US 1/29/2004 -9,090.000 -9,912.02 0.00 -9,912.02
TREASURY INFLATION INDEX NT 1/30/2004
SEC ID:9128273T7 1/29/2004
OCSF07522202:LONG TERM OPER-PIMCO
SW TO BRING ACCOUNT INTO BALANCE US 1/29/2004 -38,870.000 -43,194.38 0.00 -43,194.38
TREASURY INFLATION INDEX NT 1/30/2004
SEC ID:9128274Y5 1/29/2004
OCSF07522202:LONGTERM OPER-PIMCO
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR: -91,360.000 -91,395.36 0.00 -91,395.36
TOTAL FIXED INCOME SECURITIES BASE: -91,360.000 -91,395.36 0.00 -91,395.36
TOTAL MISCELLANEOUS ACTIVITY BASE: -91,360.000 -91,395.36 0.00 -91,395.36
INTEREST
CASH&CASH EQUIVALENTS
U.S. DOLLAR
IT FEDERAL HOME LN MTG CORP DISC MAT 1/15/2004 20,800,000.000 55,995.34 55,995.34 0.00
01/15/2004 1/15/2004
SEC ID:313396RV7 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
21612004 1:44:31 PM PST 18 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED➢02-16fl[1171❑❑7LI[ 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tram Settle Date Price Cost Amount Net Gain/Loss
TYPe Description Reported Date Base Shares/Par Base Base Base
IT FEDERAL HOME LN MTG CORP DISC MAT 1/21/2004 5,200,000.000 4,862.00 4,862.00 0.00
01/21/2004 1/21/2004
SEC ID:313396SBO 1/21/2004
OCSF07511102:LIQUID OPER-PIMCO
IT FEDERAL HOME LN MTG CORP DISC MAT 1/29/2004 1,200,000.000 3,281.33 3,281.33 0.00
01/29/2004 1/29/2004
SEC ID:313396SKO 1/29/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT WELLS FARGO BANK NA INSTL C/D 1.070% 1/13/2004 1,500,000.000 1,515.83 1,515.83 0.00
01/13/2004 DD 12/10/03 1/13/2004
SEC ID:94975U2V8
OCSF07511102:LIQUID OPER-PIMCO 1/13/2004
IT DREYFUS TREASURY CASH MGMT 1/5/2004 0.000 352.19 352.19 0.00
SEC ID:996085247 1/1/2004
OCSF07522202:LONGTERM OPER-PIMCO 1/5/2004
IT DREYFUS TREASURY CASH MGMT 1/5/2004 0.000 1,161.74 1,161.74 0.00
SEC ID:996085247 1/1/2004
OCSF07511102:LIQUID OPER-P1MC0 1/5/2004
IT BSDT-LATE MONEY DEPOSIT ACCT 1/2/2004 0.000 0.25 0.25 0.00
SEC ID:996087094 1/1/2004
OCSF07522202:LONG TERM OPER-PIMCO 1/2/2004
TOTAL CASH 8c CASH EQUIVALENTS U.S. DOLLAR 28,700,000.000 67,168.68 67,168.68 0.00
TOTAL CASH&CASH EQUIVALENTS BASE: 28,700,000.000 67,168.68 67,168.68 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
IT WMP/HUNTOON PAIGE 0000-11150 7.500% 1/6/2004 769.490 5,916.81 5,916.81 0.00
12/01/203O DD 10/21/99 12/1/2003
SEC ID:302998GE3 1/6/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FHLM C GROUP##G4-0353 7.500%10/01/2004 1/15/2004 358.670 495.03 495.03 0.00
DD 03/01/99 1/1/2004
SEC ID:3128DBMA2 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31 PM PST 19 Workbench
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D.'R12❑6U❑U7❑❑❑❑11 1/2/2004 - 1/30/2004 Status: FINAL.
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TYPe Description Reported Date Base Shares/Par Base Base Base
IT FHLMC MULTICLASS MTG SER E3 A VAR RT 1/23/2004 36,324.900 3,615.79 3,615.79 0.00
08/15/2032 DD 12/01/97 12/1/2003
SEC ID:3133TCE95
OCSF07522202:LONGTERM OPER-PIMCO 1/23/2004
IT FHLMC MULTICLASS CTF SER 1620Z 6.000% 1/20/2004 15,085.080 15,085.08 15,085.08 0.00
11/15/2023 DD 11/01/93 1/1/2004
SEC ID:3133T17A4 1/20/2004
OCSF07522202:LONGTERM OPER-P1MCO
IT FEDERAL FARM CR BKS CONS SYSTE 6.40% 1/23/2004 1,350,000.000 36,450.00 36,450.00 0.00
01/23/2004 DD 01/01/1999 1/23/2004
SEC ID:31331 H6G7
OCSF0751 1102:LIQUID OPER-PIMCO 1/23/2004
IT FHLMC GROUP#78-6064 6.384%O1/01/2028 1/21/2004 198.210 253.54 253.54 0.00
DD 12/01/97 12/1/2003
SEC ID:31348SWZ3 1/21/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL40254510 5.000%11/01/2017 1/26/2004 13,146.830 3,524.02 3,524.02 0.00
DD 10/01/02 1/1/2004
SECID:31371KVB4 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0254631 5.000%02/01/2018 1/26/2004 2,287.350 744.90 744.90 0.00
DD 01/01/03 1/1/2004
SEC ID:31371KY47 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0254760 5.000%06/01/2018 1/26/2004 1,989.920 672.48 672.48 0.00
DD 05/01/03 1/1/2004
SECID:31371K5V9 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL40254866 5.000%09/01/2018 1/26/2004 657.450 292.77 292.77 0.00
DD 08/01/03 1/1/2004
SECID:31371LCB3 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL40254953 5.000%11/01/2018 1/26/2004 3,662.190 1,553.89 1,553.89 0.00
DD 10/01/03 1/1/2004
SEC ID:31371LE21 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 20 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D,,,,T9_-16❑C1U"nL!Af)l! 1/2/2004 - 1/30/2004 Status: FINAL.
Trade Date
LTTry
Settle Date Price Cost Amount Net gain/Loss
Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL 40254987 5.000%12/01/2018 1/26/2004 5,460.460 4,144.90 4,144.90 0.00
DD 11/01/03 1/1/2004
SEC ID:31371LF46 1/26/2004
OCSF07522202:LONGTERM OPER-P1MCO
IT FNMA POOL#0323980 6.000%04/01/2014 1/26/2004 8,087.050 1,062.92 1,062.92 0.00
DD 09/01/99 1/1/2004
SEC ID:31374T2M0 1/26/2004
0CSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOLU0357328 5.000%01/01/2018 1/26/2004 857.750 135.86 135.86 0.00
DD 01/01/03 1/1/2004
SEC ID:31376J4M8 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0357430 5.000%09/01/2018 1/26/2004 21,165,050 6,698.55 6,698.55 0.00
DD 09/01/03 1/1/2004
SEC ID:31376KA71 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0456482 6.000%02/01/2014 1/26/2004 4,487.760 329.25 329.25 0.00
DD 02/01/99 1/1/2004
SEC ID:31381 CCT2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL U0509649 6.000%09/01/2014 1/26/2004 1,269.640 883.50 883.50 0.00
DD 09/01/99 1/1/2004
SEC ID:31383QEW0 1/26/2004
0CSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL410535451 6.000%06/01/2015 1/26/2004 5,805.910 837.61 837.61 0.00
DD 07/01/00 1/1/2004
SEC ID:31384VZQ8 1/26/2004
0CSF07522202:LONG TERM OPER-PIMCO
IT FNMA P00L#0535672 6.000%01/01/2016 1/26/2004 141,028.850 18,196.28 18,196.28 0.00
DD 12/01/00 1/1/2004
SEC ID:31384WCHl 1/26/2004
0CSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0545296 6.000%11/01/2016 1/26/2004 56,716.250 6,024.90 6,024.90 0.00
DD 10/01/01 1/1/2004
SECID:31385HXZ0 1/26/2004
0CSF07522202:LONG TERM OPER-PIMCO
21612004 1:44:31 PM PST 21 Workbench
Transaction Detail Report M: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD�ONSOLIDATED QllL2J6U0O❑❑❑U(]C; 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
ETY; Description
Settle Date Price Cost Amount Net Gain/Loss
Reported Date Base Shares/Par Base Base Base
IT FNMA POOL40545580 6.000%03/01/2017 1/26/2004 4,582.050 507.40 507.40 0.00
DD 03/01/02 1/1/2004
SEC ID:31385JCR7
OCSF07522202:LONG TERM OPER-PIMCO 1/2b/2004
IT FNMA POOL N0555101 6.000%10/01/2017 1/26/2004 6,886.520 895.08 895.08 0.00
DD 11/01/02 1/1/2004
SEC ID:31385WU23 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0555285 6.000%03/01/2033 1/26/2004 27,799.860 4,020.34 4,020.34 0.00
DD 02/01/03 1/1/2004
SEC ID:31385W2S7 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL 90555363 5.000%04/01/2018 1/26/2004 4,967.260 1,607.11 1,607.11 0.00
DD 03/01/03 1/1/2004
SEC ID:31385W5Y1
OCSF07522202:LONG TERM OPER-PIMCO 1/26/2004
IT FNMA POOL40555453 5.000%05/01/2018 1/26/2004 575.290 164.89 164.89 0.00
DD 04/01/03 1/1/2004
SEC ID:31385XBW6 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0555528 6.000%04/01/2033 1/26/2004 28,572.420 3,866.30 3,866.30 0.00
DD 05/01/03 1/1/2004
SEC ID:31385XD95 1/26/2004
OCSF07522202:LONGTERM OPER-P1MCO
IT FNMA POOL#0555545 5.000%06/01/2018 1/26/2004 4,399.480 1,341.35 1,341.35 0.00
DD 05/01/03 1/1/2004
SECID:31385XES2 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0555621 5.000%07/01/2018 1/26/2004 13,305.510 4,650.65 4,650.65 0.00
DD 06/01/03 1/1/2004
SECID:31385XG68 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0576386 6.000%05/01/2016 1/26/2004 457.970 325.61 325.61 0.00
DD 05/01/01 1/1/2004
SEC ID:31386XJ72 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
21612004 1:44:31PM PST 22 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: uSD
OCSD-CONSOLI DATE D:.U2-16fin !:?0!?_]Clr 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL#0576739 6.000%04/01/2016 1/26/2004 1,179.410 875.55 875.55 0.00
DD 04/01/01 1/1/2004
SEC ID:31386XV86 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0580888 6.000%05/01/2016 1/26/2004 3,867.770 1,172.20 1,172.20 0.00
DD 05/01/01 1/1/2004
SEC ID:31387DJ91
OCSF07522202:LONGTERM OPER-PIMCO 1/26/2004
IT FNMA POOL#0594002 6.000%07/01/2016 1/26/2004 901.450 925.14 925.14 0.00
DD 07/01/01 1/1/2004
SEC ID:31387T3K8
OCSF07522202:LONGTERM OPER-PIMCO 1/26/2004
IT FNMA POOL#0597376 6.000%09/01/2016 1/26/2004 19,556.630 1,272.57 1,272.57 0.00
DD 08/01/01 1/1/2004
SEC ID:31387XT96 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0605259 6.000%09/01/2016 1/26/2004 7,343.520 825.92 825.92 0.00
DD 09/01/01 1/1/2004
SEC ID:31388HMG1 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0608366 6.000%10/01/2016 1/26/2004 564.940 516.19 516.19 0.00
DD 09/01/01 1/1/2004
SEC ID:31388LZ78 1/26/2004
OCSF07522202:LONG TERM 0 PER-PIMC0
IT FNMA POOL#0616734 6.000%12/01/2016 1/26/2004 710.670 852.88 852.88 0.00
DD 12/01/01 1/1/2004
SEC ID:31388WEF9 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0630812 6.000%02/01/2017 1/26/2004 13,600.900 1,008.41 1,008.41 0.00
DD 02/01/02 1/1/2004
SEC ID:31389NYH2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0632376 6.000%07/01/2017 1/26/2004 22,751.220 4,245.37 4,245.37 0.00
DD 07/01/02 1/1/2004
SEC ID:31389QQ50 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 23 Wgrkbench„
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSDCONSOLI DATE D=2J6LIODJOD_7GG 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tr'an Settle Date Price Cost Amount Net chain/Loss
Type Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL#0653116 6.000%07/01/2017 1/26/2004 14,079.790 2,430.81 2,430.81 0.00
DD 07/01/02 1/1/2004
SEC ID:31390QSD8
OCSF07522202:LONG TERM OPER-PIMCO 1/26/2004
IT FNMA POOL#0673280 6.000%08/01/2017 1/26/2004 7,361.930 978.39 978.39 0.00
DD 11/01/02 1/1/2004
SEC ID:31391P6R2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL40681309 5.000%02/01/2018 1/26/2004 6,842.820 2,405.21 2,405.21 0.00
DD 02/01/03 1/1/2004
SEC ID:31391Y3S4 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0681334 5.000%02/01/2018 1/26/2004 1,369.550 303.01 303.01 0.00
DD 01/01/03 1/1/2004
SEC ID:31391Y4T1 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
1T FNMA POOL#0684908 5.000%06/01/2018 1/26/2004 1,707.890 1,476.36 1,476.36 0.00
DD 05/01/03 1/1/2004
SECID:31400D3R1 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0685200 5.000%03/01/2018 1/26/2004 2,007.800 862.50 862.50 0.00
DD 03/01/03 1/1/2004
SEC ID:31400EGH7 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL40685665 5.000%02/01/2018 1/26/2004 451.100 153.55 153.55 0.00
DD 02/01/03 1/1/2004
SEC ID:31400EW22 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0686318 5.000%03/01/2018 1/26/2004 2,131.030 1,315.39 1,315.39 0.00
DD 03/01/03 1/1/2004
SEC ID:31400FPB7 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
1T FNMA POOL#0688739 5.000%06/01/2018 1/26/2004 576.480 516.75 516.75 0.00
DD 06/01/03 1/1/2004
SEC ID:31400JEL9 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31 PM PST 24 Workbench
Transaction Detail Report ID: EVM009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD�CONSOLI DATE D"19r2D60OLYN G 700 1/2/2004 - 1/30/2004 Status: FINAL.
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL#0689859 5.000%05/01/2018 1/26/2004 516.090 530.75 530.75 0.00
DD 05/01/03 1/1/2004
SEC ID:31400KMG8 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL 40693834 5.000%03/01/2018 1/26/2004 13,238.630 3,131.68 3,131.68 0.00
DD 03/01/03 1/1/2004
SEC ID:31400PY74 1/26/2004
OCSF07522202: LONGTERM OPER-PIMCO
IT FNMA POOL#0695852 5.000%05/01/2018 1/26/2004 4,898.280 1,145.18 1,145.18 0.00
DD 05/01/03 1/1/2004
SEC ID:31400SBVO 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL40695889 5.000%05/01/2018 1/26/2004 5,136.630 3,502.83 3,502.83 0.00
DD 05/01/03 1/1/2004
SEC ID:31400SC23
OCSF07522202:LONGTERM OPER-PIMCO 1/26/2004
IT FNMA POOL#0697026 5.000%05/01/2018 1/26/2004 666.330 112.87 112.87 0.00
DD 04/01/03 1/1/2004
SEC ID:31400TLF2 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0698939 6.000%09/01/2017 1/26/2004 481.740 459.79 459.79 0.00
DD 03/01/03 1/1/2004
SEC ID:31400VPY2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0702210 5.000%05/01/2018 1/26/2004 1,316.090 1,157.83 1,157.83 0.00
DD 05/01/03 1/1/2004
SEC ID:31401ADP9 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0702328 5.000%05/01/2018 1/26/2004 1,410.860 623.46 623.46 0.00
DD 04/01/03 1/1/2004
SEC ID:31401AHD2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0703195 6.000%01/01/2017 1/26/2004 3,406.370 411.79 411.79 0.00
DD 04/01/03 1/1/2004
SEC ID:31401BGC3 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 25 Workbench'
Transaction Detail Report ID: EWBO09.
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D-OH2 1611Fif] 11i itlf. 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL#0709148 5.000%06/01/2018 1/26/2004 3,586.470 1,261.04 1,261.04 0.00
DD 06/01/03 1/1/2004
SEC ID:31401HZM7 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0709360 5.000%07/01/2018 1/26/2004 2,926.110 2,912.34 2,912.34 0.00
DD 06/01/03 1/1/2004
SEC ID:31401JB56 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0709826 5.000%06/01/2018 1/26/2004 2,905.600 605.95 605.95 0.00
DD 06/01/03 1/1/2004
SEC ID:31401JSP4 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0709917 5.000%06/01/2018 1/26/2004 2,618.620 1,106.78 1,106.78 0.00
DD 06/01/03 1/1/2004
SEC ID:31401JVJ4 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0709963 5.000%06/01/2018 1/26/2004 527.400 113.15 113.15 0.00
DD 06/01/03 1/1/2004
SEC ID:31401JWYO 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0710235 5.000%06/01/2018 1/26/2004 10,321.340 3,362.83 3,362.83 0.00
DD 06/01/03 1/1/2004
SEC ID:31401KBC8 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0713344 5.000%06/01/2018 1/26/2004 113.930 107.50 107.50 0.00
DD 06/01/03 1/1/2004
SEC ID:31401NP52 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0713365 5.000%07/01/2018 1/26/2004 1,459.740 1,402.99 1,402.99 0.00
DD 07/01/03 1/1/2004
SEC ID:31401NQS1 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0720319 5.000%07/01/2018 1/26/2004 18,244.370 4,134.03 4,134.03 0.00
DD 07/01/03 1/1/2004
SEC ID:31401 WG45
OCSF07522202:LONGTERM OPER-PIMCO 1/26/2004
21612004 1:44:31 PM PST 26 Workbench
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE DJU1i2_160I7l 1/2/2004 - 1/30/2004 status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL#0720369 5.000%06/01/2018 1/26/2004 10,829.600 10,164.74 10,164.74 0.00
DD 06/01/03 1/1/2004
SEC ID:31401WJN0 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0721629 5.000%07/01/2018 1/26/2004 3,056.530 1,315.38 1,315.38 0.00
DD 06/01/03 1/1/2004
SEC ID:31401XVW4 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0723487 5.000%06/01/2018 1/26/2004 958.520 1,055.04 1,055.04 0.00
DD 06/01/03 1/1/2004
SEC ID:31402AXQ4 1/26/2004
OCSF07522202:LONGTERM OPER-P1MCO
IT FNMA POOL#0729601 5.000%07/01/2018 1/26/2004 4,467.340 1,795.13 1,795.13 0.00
DD 07/01/03 1/1/2004
SEC ID:31402HRW3 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL 100732873 5.000% 11/01/2018 1/26/2004 136.390 152.42 152.42 0.00
DD 10/01/03 1/1/2004
SEC ID:31402MFN5 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0737130 5.000%10/01/2018 1/26/2004 3,579.870 3,131.03 3,131.03 0.00
DD 10/01/03 1/1/2004
SEC ID:31402S4P9 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0738211 5.000%10/01/2018 1/26/2004 2,422.080 2,469.88 2,469.88 0.00
DD 10/01/03 1/1/2004
SEC ID:31402UDQ2 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0738487 5.000%10/01/2018 1/26/2004 1,211.820 938.97 938.97 0.00
DD 10/01/03 1/1/2004
SEC ID:31402UNC2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0740471 5.000%10/01/2018 1/26/2004 2,831.240 2,918.60 2,918.60 0.00
DD 10/01/03 1/1/2004
SEC ID:31402WC40 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31 PM PST 27 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSDCONSOLIDATED1IIi2 ]61-1DDJDI!_Il_][1 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
Tyle Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL 40740748 5.000%10/01/2018 1/26/2004 3,334.950 3,461.97 3,461.97 0.00
DD 11/01/03 1/1/2004
SEC ID:31402W5H7 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0743868 5.000%11/01/2018 1/25/2004 0.000 189.24 189.24 0.00
DD 10/01/03 1/1/2004
SEC ID:31403BMR1 1/25/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0744008 5.000%07/01/2018 1/26/2004 35,627.260 4,931.85 4,931.85 0.00
DD 09/01/03 1/1/2004
SEC ID:31403BR54
OCSF07522202:LONGTERM OPER-PIMCO 1/26/2004
IT FNMA POOL40744316 5.000%09/01/2018 1/26/2004 3,123.690 732.68 732.68 0.00
DD 09/01/03 1/1/2004
SEC ID:31403B3Z4 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0747914 5.000%11/01/2018 1/26/2004 1,377.790 1,512.19 1,512.19 0.00
DD 11/01/03 1/1/2004
SEC ID:31403F3X0 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0748400 5.000%08/01/2018 1/26/2004 979.100 1,018.04 1,018,04 0.00
DD 09/01/03 1/1/2004
SEC ID:31403GNR9 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0748899 5.000%12/01/2018 1/26/2004 5,255.130 4,332.01 4,332.01 0.00
DD 11/01/03 1/1/2004
SEC ID:31403G7L0
OCSF07522202:LONGTERM OPER-PIMCO 1/26/2004
IT FNMA POOL N0750377 5.000%11/01/2018 1/26/2004 10,591.890 10,626.95 10,626.95 0.00
DD 11/01/03 1/1/2004
SEC ID-.31403JUA2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0750380 5.000% 11/01/2018 1/26/2004 8,623.080 8,909.27 8,909.27 0.00
DD 11/01/03 1/1/2004
SEC ID:31403JUD6 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31 PM PST 28 Workbench
Transaction Detail Report ID: EWB009
1 Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D ➢➢12d6C[IJ❑*:1[]I7:]❑❑ 1/2/2004 - 1/30/2004 Status: FINAL
ETrade Date
Tian Settle Date Price Cost Amount Net Gain/Loss
�Pe Description Reported Date Base Shares/Par Base Base Base
IT FNMA POOL#0750445 5.000%11/01/2018 1/26/2004 825.320 808.95 808.95 0.00
DD 11/01/03 1/1/2004
SEC ID:31403JWE2 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0751960 5.000%12/01/2018 1/26/2004 6,226.480 3,808.73 3,808.73 0.00
DD 11/01/03 1/1/2004
SEC ID:31403LMHI 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0753425 5.000%11/01/2018 1/26/2004 3,978.340 4,147.39 4,147.39 0.00
DD 11/01/03 1/1/2004
SEC ID:31403NA23 1/26/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT FNMA POOL#0755165 5.000%12/01/2018 1/26/2004 6,816.060 2,724.69 2,724.69 0.00
DD 11/01/03 1/1/2004
SEC ID:31403Q6A3 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FNMA POOL#0756372 5.000%11/01/2018 1/26/2004 3,823.240 4,148.02 4,148.02 0.00
DD 11/01/03 1/1/2004
SEC ID:31403SJR8 1/26/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT FORD MTR CR CO GLOBAL LANDMARK 6.700% 1/16/2004 2,500,000.000 83,750.00 83,750.00 0.00
07/16/2004 DD 07/16/99 1/16/2004
SEC ID:345397SJ3 1/16/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0596612 6.500°/a 09/15/2032 1/15/2004 38,400.560 1,825.28 1,825.28 0.00
DD 09/01/02 1/1/2004
SEC ID:36200BYH4 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0569358 6.500%04/15/2032 1/15/2004 50,154.760 6,608.86 6,608.86 0.00
-DD 04/01/02 1/1/2004
SEC ID:362000QK3 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0569685 6.500%02/15/2032 1/15/2004 3,368.790 287.96 287.96 0.00
DD 02/01/02 1/1/2004
SEC ID:36200Q2S2 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 29 Workbench
Transaction Detail Report m: EWBO09
/ Mellon Reported by Transaction Category Base Currency: USD
OCSDCONS ILI DATE DM2-D6❑❑❑011-111111 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss_
Tyne Description Reported Date Base Shares/Par Base Base Base
IT GNMA POOL#0570019 6.5009/6 07/15/2032 1/15/2004 4,226.350 490.06 490.06 0.00
DD 07/01/02 1/1/2004
SEC ID:3620ORG48 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0574323 6.500% 12/15/2031 1/15/2004 64,377.350 3,026.24 3,026.24 0.00
DD 12/01/01 1/1/2004
SEC ID:36200WAY7
OCSF07522202:LONG TERM OPER-PIMCO 1/15/2004
IT GNMA POOL#0575364 6.500% 11/15/2031 1/15/2004 6,537.050 320.57 320.57 0.00
DD 11/01/01 1/1/2004
SECID:3620OXFD6 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0587117 6.500%06/15/2032 1/15/2004 676.370 116.75 116.75 0.00
DD 06/01/02 1/1/2004
SEC ID:36201MG22 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0587439 6.5009/611/15/2032 1/15/2004 5,396,620 352.85 352.85 0.00
DD 12/01/02 1/1/2004
SEC ID:36201MS45 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0421389 6.5000/o 04/15/2026 1/15/2004 394.930 80.92 80.92 0.00
DD 04/01/96 1/1/2004
SEC ID:36206UC23 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0438057 6.0000/o05/15/2028 1/15/2004 10,775.940 146.92 146.92 0.00
DD 05/01/98 1/1/2004
SEC ID:36207PTN9 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0449851 6.5000/o O1/15/2028 1/15/2004 2,075.110 135.27 135.27 0.00
DD 01/01/98 1/1/2004
SEC ID:36208FWLO 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0457814 6.000% 10/15/2028 1/15/2004 1,405.330 191.75 191.75 0.00
DD 10/01/98 1/1/2004
SEC ID:36208QSB3 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 30 Workbench
Transaction Detail Report m: EWB009
/ Mellon Reported by Transaction Category Base Currency: usD
OCSD-CONSOLI DATE D`15;2-160n;7❑1i;1C1Ci 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Trap Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT GNMA POOL#0465546 6.000%08/15/2028 1/15/2004 806.280 2,295.22 2,295.22 0.00
DD 08/01/98 1/1/2004
SEC ID:36209AET3 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL110465555 6.000%09/15/2028 1/15/2004 908.590 2,471.99 2,471.99 0.00
DD 09/01/98 1/1/2004
SEC ID:36209AE48 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0466845 6.500%06/15/2028 1/15/2004 91.270 364.90 364.90 0.00
DD 06/01/98 1/1/2004
SEC ID:3620913TA6 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL40467279 6.000% 10/15/2028 1/15/2004 2,223,510 114.20 114.20 0.00
DD 10/01/98 1/1/2004
SEC ID:36209CCQ7 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0467286 6.000% 10/15/2028 1/15/2004 547.250 1,990.36 1,990.36 0.00
DD 10/01/98 1/1/2004
SEC ID:36209CCX2
OCSF07522202:LONG TERM OPER-PIMCO 1/15/2004
IT GNMA POOL#0468052 6.500%07/15/2028 1/15/2004 147,567.580 1,413.37 1,413.37 0.00
DD 07/01/98 1/1/2004
SEC ID:36209C5M4 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0468330 6.000%05/15/2028 1/15/2004 35.500 94.36 94.36 0.00
DD 05/01/98 1/1/2004
SEC ID:36209DHF4 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0468339 6.000%08/15/2028 1/15/2004 16,547.440 1,604.44 1,604.44 0.00
DD 08/01/98 1/1/2004
SEC ID:36209DHQO 1/15/2004
OCSF07522202:LONG TERM OPER-P1MC0
IT GNMA POOL#0469688 6.000% 11/15/2028 1/15/2004 924.040 81.83 81.83 0.00
DD 11/01/98 1/1/2004
SEC ID:36209EXR8 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 31 Workbench.,
Transaction Detail Report ID: EWB009
@ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D-EII'2.160 1/2/2004 - 1/30/2004 Status: FINAL.
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Coss
TYPe Description Reported Date Base Shares/Par Base Base Base
IT GNMA POOL#0476041 6.500%06/15/2028 1/15/2004 27,647.590 1,153.04 1,153.04 0.00
DD 06/01/98 1/1/2004
SEC ID:36209MZE7
OCSF07522202:LONGTERM OPER-PIMCO 1/15/2004
IT GNMA POOL 110478626 6.5009%01/15/2029 1/15/2004 211.280 889.85 889.85 0.00
DD 01/01/99 1/1/2004
SEC ID:36209QVT9 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL 40480598 6.500% 10/15/2028 1/15/2004 46,314.430 917.12 917.12 0.00
DD 10/01/98 1/1/2004
SEC ID:36209S3F6 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0483452 6.000%09/15/2028 1/15/2004 19.290 65.95 65.95 0.00
DD 09/01/98 1/1/2004
SEC ID:36209WBV3 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0485527 6.500%06/15/2031 1/15/2004 24,899.1 10 2,492.03 2,492.03 0.00
DD 06/01/01 1/1/2004
SEC ID:36209YLG1 1/15/2004
OCSF07522202:LONG TERM OPER-P1MCO
IT GNMA POOL#0485610 6.500%07/15/2031 1/15/2004 28,687.650 2,813.55 2,813.55 0.00
DD 07/01/01 1/1/2004
SEC ID:36209YN38 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0485682 6.500%08/15/2031 1/15/2004 8,446.330 572.27 572.27 0.00
DD 08/01/01 1/1/2004
SECID:36209YRB6 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0485703 6.500%08/15/2031 1/15/2004 11,888.540 546.40 546.40 0.00
DD 08/01/01 1/1/2004
SEC ID:36209YRY6 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL 00486720 6.000% 12/15/2028 1/15/2004 210.060 61.44 61.44 0.00
DD 12/01/98 1/1/2004
SEC ID:36210AVM6 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
21612004 1:44:31PM PST 32 Workbench
Transaction Detail Report ID: EWB009
Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLIDATED 2:I60UD_IUUJ011 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT GNMA POOL#0491103 6.000%01/15/2029 1/15/2004 1,884.740 539.24 539.24 0.00
DD 01/01/99 1/1/2004
SEC ID:36210FRY4 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0496461 6.000%01/15/2029 1/15/2004 30,066.560 2,204.18 2,204.18 0.00
DD 01/01/99 1/1/2004
SEC ID:36210MQN4 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL H0497343 6.000% 12/15/2028 1/15/2004 857.920 116.79 116.79 0.00
DD 12/01/98 1/1/2004
SEC ID:36210NP45
OCSF07522202:LONGTERM OPER-PIMCO 1/15/2004
IT GNMA POOL#0499153 6.000%02/15/2029 1/15/2004 17.790 63.35 63.35 0.00
DD 02/01/99 1/1/2004
SEC ID:36210QQE5 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL 40500917 6.000%04/15/2029 1/15/2004 10.730 36.64 36.64 0.00
DD 04/01/99 1/1/2004
SEC ID:36210SPAO 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0503388 6.000%03/15/2029 1/15/2004 5,810.900 1,587.81 1,587.81 0.00
DD 03/01/99 1/1/2004
SEC ID:36210VF55 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL#0506636 6.000%04/15/2029 1/15/2004 1,389.910 183.64 183.64 0.00
DD 04/01/99 1/1/2004
SEC ID:36210YY90 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0512235 6.500% 11/15/2029 1/15/2004 14.440 59.22 59.22 0.00
DD 11/01/99 1/1/2004
SEC ID:36211GBC6 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
1T GNMA POOL#0514326 6.500%07/15/2029 1/15/2004 18,637.430 908.75 908.75 0.00
DD 07/01/99 1/1/2004
SEC ID:36211JLF2 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
2/6/2004 1:44:31PM PST 33 Workbench
Transaction Detail Report ID: EWBO09
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE URE2❑6❑❑❑7❑❑I❑❑ 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
EDescription
Settle Date Price Cost Amount Net Gain/Loss Reported Date Base Shares/Par Base Base Base
IT GNMA POOL 40530053 6.500%04/15/2031 1/15/2004 3,523.720 279.73 279.73 0.00
DD 04/01/01 1/1/2004
SEC ID:36212 CZS3 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL#0537885 6.500%02/15/2031 1/15/2004 111.220 568.98 568.98 0.00
DD 02/01/01 1/1/2004
SEC ID:36212MREI 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL 00547512 6.500%04/15/2031 1/15/2004 572.230 72.41 72.41 0.00
DD 04/01/01 1/1/2004
SEC ID:36212YGV9 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL 00547715 6.500%02/15/2031 1/15/2004 165.960 695.16 695.16 0.00
DD 02/01/01 1/1/2004
SEC ID:36212YN82
OCSF07522202:LONG TERM OPER-PIMCO 1/15/2004
IT GNMA POOL00552322 6.500%01/15/2032 1/15/2004 4.608.160 421.00 421.00 0.00
DD 01/01/02 1/1/2004
SEC ID:36213ESK3 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL M0552466 6.500%03/15/2032 1/15/2004 55,868.040 3,223.64 3,223.64 0.00
DD 03/01/02 1/1/2004
SEC ID:36213EW36 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA POOL 00552659 6.500%07/15/2032 1/15/2004 20,020.200 2,476.14 2,476.14 0.00
DD 07/01/02 1/1/2004
SEC ID:36213E5U6 1/15/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT GNMA POOL00561017 6.500%07/15/2031 1/15/2004 20,504.950 2,480.75 2,480.75 0.00
DD 07/01/01 1/1/2004
SEC ID:36213QG29 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GNMA II POOL40080023 VAR RT 12/20/2026 1/20/2004 8,257.150 1,076.49 1,076.49 0.00
DD 12/01/96 1/1/2004
SEC ID:36225CAZ9 1/20/2004
OCSF07522202:LONG TERM OPER-PIMCO
21612004 1:44:31 PM PST 34 Workbench
Transaction Detail Report ID: EWB009
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD�ONS )LI DATE DAIR2--161jnn-lna_]❑D 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Trap Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT GNMA 11 POOL#080088M 7.375%06/20/2027 1/20/2004 2,693.490 1,203.80 1,203.80 0.00
DD 06/01/97 1/1/2004
SEC ID:36225CC20
OCSF07522202:LONGTERM OPER-PIMCO 1/20/2004
IT GNMA 11 POOL#0080395 VAR RT 04/20/2030 1/20/2004 8,639.960 807.70 807.70 0.00
DD 04/01/00 1/1/2004
SEC ID:36225CNM4
OCSF07522202:LONGTERM OPER-PIMCO 1/20/2004
IT GNMA 11 POOL#080408X 6.500%05/20/2030 1/20/2004 83,276.430 7,224.86 7,224.86 0.00
DD 05/01/00 1/1/2004
SEC ID:36225CN28 1/20/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT GENERAL ELEC CAP MTN #TR 00545 VAR RT 1/20/2004 1,000,000.000 1,022.05 1,022.05 0.00
05/20/2004 DD 05/20/02 1/20/2004
SEC ID:36962GYS7 1/20/2004
OCSF0751 1102:LIQUID OPER-PIMCO
IT GENERAL ELEC CAP MTN#TR 00575 5.450% 1/15/2004 5,000,000.000 136,250.00 136,250.00 0.00
01/15/2013 DD 12/06/02 1/15/2004
SEC ID:36962GZY3
OCSF07522202:LONGTERM OPER-PIMCO 1/15/2004
IT GOLDMAN SACHS GROUP INC SR NT 4.125% 1/15/2004 3,000,000.000 61,875.00 61,875.00 0.00
01/15/2008 DD 01/13/03 1/15/2004
SEC ID:38141 GCS 1
OCSF07522202:LONGTERM OPER-PIMCO 1/15/2004
IT GNMA GTD REMIC TR 2000-9 FH VAR RT 1/16/2004 25,900.060 1,000.40 1,000.40 0.00
02/16/2030 1/16/2004
SEC ID:3837H4NX9 1/16/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT JP MORGAN CHASE&CO SUB NT 5.750% 1/2/2004 3,000,000.000 86,250.00 86,250.00 0.00
01/02/2013 DD 11/25/02 1/2/2004
SEC ID:46625HAT7
OCSF07522202:LONG TERM OPER-PIMCO 1/2/2004
IT NATIONSBANK CORP SR NTS 6.125% 1/15/2004 627,000.000 19,201.88 19,201.88 0.00
07/15/20G4 DD 07/23/98 1/15/2004
SEC ID:638585BJ7 1/15/2004
OCSF0751 1102:LIQUID OPER-PIMCO
2/6/2004 1:44:31PM PST 35 Workbench
Transaction Detail Report ID: EWBO09
/ Mellon Reported by Transaction Category Base Currency: USD
OCSD-CONSOLI DATE D.M➢2-16000--100 JU0 1/2/2004 - 1/30/2004 Status: FINAL
Trade Date
Tran Settle Date Price Cost Amount Net Gain/Loss
TyPe Description Reported Date Base Shares/Par Base Base Base
IT RESIDENTIAL ASSET 03-RSI I AIIB VAR RT 1/29/2004 15,494.300 1,101.51 1,101.51 0.00
12/25/2033 DD 12/30/03 1/25/2004
SEC ID:760985K83 1/29/2004
OCSF07522202:LONG TERM OPER-PIMCO
IT US TREASURY INFLATION INDEX NT 3.375% 1/15/2004 14,000,000.000 275,524.20 275,524.20 0.00
01/15/2007 DD 01/15/97 1/15/2004
SEC ID:9128272M3 1/15/2004
OCSF07522202:LONGTERM OPER-PIMCO
IT US TREASURY INFLATION INDEX NT 3.6251/6 1/15/2004 3,000,000.000 62,189.78 62,189,78 0.00
01/15/2008 DD 01/15/98 1/15/2004
SEC ID:9128273T7
OCSF07522202:LONGTERM OPER-PIMCO 1/15/2004
IT US TREASURY INFLATION INDEX NT 3.875% 1/15/2004 13,000,000.000 283,780.01 283,780.01 0.00
01/15/2009 DD 01/15/99 1/15/2004
SEC ID:9128274Y5
OCSF07522202:LONGTERM OPER-PIMCO 1/15/2004
IT WELLS FARGO &CO NEW NT 6.625% 1/15/2004 125,000.000 4,140.63 4,140.63 0.00
07/15/2004 DD 07/28/99 1/15/2004
SEC ID:949746AA9
OCSF0751 1102:LIQUID OPER-PIMCO 1/15/2004
TOTAL FIXED INCOME SECURITIES U.S. DOLLAR 48,127,851.580 1,323,650.46 1,323,650.46 0.00
TOTAL FIXED INCOME SECURITIES BASE: 48,127,851.580 1,323,650.46 1,323,650.46 0.00
TOTAL INTEREST BASE: 76,827,851.580 1,390,819.14 1,390,819.14 0.00
TOTAL TRANSACTIONS: 80,150,857.140 4,655,802.02 -1,984,067.98 -121,130.98
21612004 1:44:31 PM PST 36 Workbench
FAHR COMMITTEE Meeting Date To Bd.of Dir.
02/11/04 02/25/04
AGENDA REPORT Item Number Item Number
FAHR04-05 14(c)
Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Michael D. White, Controller
SUBJECT: MID-YEAR FINANCIAL REPORT FOR THE PERIOD ENDED
DECEMBER 31 , 2003
GENERAL MANAGER'S RECOMMENDATION
Receive and file FY 2003-04 Mid-Year Financial Report for the period ended
December 31, 2003.
SUMMARY
Attached in a separately bound document is the District's Mid-Year Financial Report for
the period ended December 31, 2003. This report is a consolidation of the financial
accomplishments of the District at the December 31 , 2003, mid-year point.
Contained within the Mid-Year Financial Report are budget summary reviews of the
Joint Operating & Working Capital Funds. the Capital Improvement Program, the
Revenue Areas, and the self-insurance funds.
As indicated within the Overview Section of this report, 52.19 percent, or $40.19 million
of the FY 2003-04 net joint operating budget of $77.01 million has been expended. Net
cost has increased $10.33 million, or 34.6 percent in comparison with the same period
last year primarily due to the increased level of wastewater treatment with full
disinfection.
The total cost per million gallons at December 31 , 2003, is S899.98 based on flows of
44.66 billion gallons, or 242.72 million gallons per day. This is S58.35, or 6.93 percent
above the budgeted cost per million gallons of $841 .63. This overage is primarily due to
expenditures being higher than budget by 4.38 percent, or $1 .69 million. The remaining
increase is due to flows being 2.91 percent lower than the budget estimate of 250
million gallons per day.
PROJECT/CONTRACT COST SUMMARY
N/A
Wdept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(c).Mid-VearFinanclalReport.doc
Revised: 8l20,'98 Page
BUDGETIMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
None.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1 . FY 2003-04 Mid-Year Financial Report for the period Ended December 31 , 2003.
H:\dept\agenda\Board Agenda Reports12004 Board Agenda ReportM0204\ltern 14(c).Mid-YearFinancialReport.doc
Revised: 8/20/98 Page 2
FAHR COMMITTEE Meeting Date To Bd.of Dir.
02/11/04 02/25/04
AGENDA REPORT Item Number Item Number
FAHR04-06 14 d
Orange County Sanitation District
FROM: Gary G. Streed, Director of Finance
Originator: Michael D. White, Controller
SUBJECT: QUARTERLY INVESTMENT MANAGEMENT PROGRAM REPORT FOR
THE PERIOD OCTOBER 1 , 2003 THROUGH DECEMBER 31 , 2003
GENERAL MANAGER'S RECOMMENDATION
Receive and file the Quarterly Investment Management Program Report for the period
October 1 , 2003 through December 31, 2003.
SUMMARY
Section 15.0 of the District's Investment Policy includes monthly and quarterly reporting
requirements for the District's two investment portfolios. These two funds, the "Liquid
Operating Monies," and the "Long-Term Operating Monies" are managed by PIMCO,
the District's external money manager.
The ongoing monitoring of the District's investment program by staff and Callan
Associates, the District's independent investment advisor, indicates that the District's
investments are in compliance with the District's adopted Investment Policy and the
California Government Code, and that overall performance has tracked with benchmark
indices. In addition, sufficient liquidity and anticipated revenues are available for the
District to meet budgeted expenditures for the next six months. The District's portfolios
do not include any reverse repurchase agreements or derivative securities.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
E Not applicable (information item)
H1dept\agenda\FAHR\FAHR2004\0204\04-06.Quarterly Investment.doc
Revised: 8/20198 Page 1
ADDITIONAL INFORMATION W
Performance Reports
The Quarterly Strategy Review, prepared by PIMCO, and the Investment Measurement
Service Quarterly Review, prepared by Callan Associates, are attached for reference.
Also attached are Long-Term and Liquid Operating Monies Summary of Performance
Data and Portfolio Statistics charts that depict the performance results, estimated yield
and duration, credit quality, and sector diversification of the District's portfolios. as of
October 1. 2003 and December 31 , 2003. The Liquid Operating Monies portfolio, with
an average maturity of 90 days, consists entirely of cash equivalent investments such
as U.S. Treasuries and corporate discount notes.
Portfolio Performance Summary
The following table presents a performance summary of the District's portfolios as
compared to their benchmarks for the period October 1 through December 31, 2003.
Portfolio Performance Summary
Quarter Ended December 31,2003
Liquid Operating Monies(0/6) Long-Term Operating Monies(%)
Total Rate Total Rate of
of Return Benchmark"' Return Benchmark"'
3 Months 0.26 0.24 0.23 0.14
6 Months 0.54 0.48 0.57 0.48
9 Months 0.86 0.77 2.03 2.15
12 Months 1.22 1.07 3.22 13.30
Since inception 30 Sept.95 4.65 4.17 6.52 6.49
Market Value $91 AM S386.8M
Average Quality "AAA" "AAA"
Current Yield(°o) 1.6 4.4
Estimated Yield to Maturity(°o) 1.1 2.6
Quarterly Deposits(Withdrawals) S53.3M S0.0M
Estimated Annual Income $1.5M $16.1 M
(1) Benchmarks:
• Liquid Operating Portfolio: 3-Month Treasury Bill Index
■ Long-Term Operating Portfolio: Merrill Lynch Corp/Govt. 1-5 Year Bond Index
Portfolio Market Values
Comparative marked-to-market quarter-end portfolio values are shown in the following
table, and in the attached bar chart.
Liquid Long-Term
Quarter Operating Operating
Ending Monies ISM) Monies($M)
31 Mar.03 49.6 325.0
30 June 03 66.5 329.7
30 Sept.03 38.0 385.9
31 Dec.03 91.4 386.8
H:\depMgenda\FAHR\FAHR2004\0204\04-06.Quarterly Investment.doc
Revised: 8/20/98 Page 2
District's Investment Account Balances as of December 31, 2003
Book Balances Estimated
Investment Accounts December 31,2003 Yield(%)
State of Calif. LAIF $ 34,100,246 1.55
Union Bank Checking Account 815,107 0.89
PIMCO—Short-term Portfolio 91,100,342 1.37
PIMCO-Long-term Portfolio 383,028,089 2.55
Petty Cash 5,000 N/A
TOTAL $509,048,784 2.27
Debt Service Reserves w/Trustees $1602213.442 2.03
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Historical Yield Curve Graph
2. PIMCO Quarterly Report
3. Quarter End Portfolio Market Value Bar Chart
4. Summary of Performance Data and Portfolio Statistics — Liquid Operating Monies
5. Summary of Performance Data and Portfolio Statistics — L-T Operating Monies
6. Asset Summary by Asset Type — Liquid Operating Portfolio
7. Asset Summary by Asset Type — Long Term Portfolio
8. Investment Listing of Liquid Operating and L-T Portfolios (Yield Analysis Report).
9. Investment Transactions and Balances in LAIF
10. Callan Report (separate bound document)
11. PIMCO Report (separate bound document)
H:\dept\agenda\FAHR\FAHR2004\0204\04-06.Ouarterly Investment.doc
Revised: W0/98 Page 3
HISTORICAL YIELD CURVE
5.25
4.75 ----
4.50 -- - -
4.25 - - _ - --- -
4.00 --
3.75 --- . . ---- -
3.50 --- - --- ...--- - __ -- -
0 3.25 - - -- -- -------- - - - -
0 3.00 — _-- - ----- - ----- -- ---_ - ---
} 2.75
2.50 - -- -- ---
&01-
2.25 - -- - - ---
2.00 ----- ---- - --- -
1.75 ---
1.50 -- - -- -- ----- - -
1.25 -
1.00 - - - - ---- -- ----
0.75 --- --- - --
0.50
E E N M et to n o 0 0
+30-Jun-03 -A 30-Sep-03 f31-Dec-03
a
6
P I M C 0
840 Newport Center Drive
Newport Beach,CA 92660
Tel: 949.720.6000
Fax: 949.720.1376
February 2, 2004
Mr. Mike White
Controller
Orange County Sanitation District
10844 Ellis Avenue
Administration Building
Fountain Valley, CA 92708-7018
Re: 4th Quarter 2003 Report
Dear Mike:
The following is a description of events in the bond markets during the 4th quarter of 2003 and
an analysis of the strategies undertaken in the Orange County Sanitation District's Long-Term,
Liquid, and COP Proceeds portfolios over the period. We have also included a section on
strategies to be pursued in your portfolios during the coming months.
Bond Market Recap:
Bonds Gain Ground in 2003 Despite Volatile Interest Rates
Most bonds posted positive returns in the fourth quarter, capping a year in which fixed income
assets gained ground despite volatile interest rates. The Lehman Brothers Aggregate Bond Index
returned 0.32 percent for the quarter and 4.10 percent for the year.
While Treasury yields rose only 20 to 50 basis points for the year, the markets were far from
calm. For instance, yields moved lower through the first half of the year as deflation risks
dominated the news and the market's view of future Federal Reserve policy. The Fed cut the
federal funds rate to 1 percent in June and the 10-year Treasury yield plunged to a 45-year low
near 3 percent. Rates then reversed course dramatically, jumping more than 130 basis points
from June through July, which was the worst month in the U.S. government bond market in more
than 22 years.
This reversal was prompted by technical factors in the Treasury market but also by investors'
growing confidence that growth would accelerate. Economic performance in the second half of
the year met investors' expectations. Business investment revived while massive fiscal stimulus
and the lagged impact of the mortgage refinancing boom sustained consumption, leading to 8.2
e
percent annualized growth in the third quarter, the fastest pace in almost two decades. The 10-
year Treasury yield finished the year at 4.25 percent, up 43 basis points for the full year.
Commodity prices surged in 2003 as growth revived, while the dollar plunged against most
major currencies amid concern about the U.S. trade deficit. Despite these trends, inflation overall
was well behaved, which limited the rise in interest rates. In a global economy where human
resources and innovation are ever more important for boosting output, slack labor markets and
gains in labor productivity allowed companies to absorb higher prices of physical inputs without
raising prices.
Highest Yielding Bonds Fare Best As Risk Appetites Revive
The following is a summary of fixed income sector performance:
• Mortgages modestly outperformed Treasuries on a like-duration basis in 2003, though mid-
year volatility exerted a drag on returns. Mortgages outpaced Treasuries in the final quarter
as market conditions stabilized. With mortgage rates well above the summer's lows,
refinancings at year end were some 80 percent slower than the record pace of mid year.
Mortgage yield premiums relative to Treasuries fell considerably in the fourth quarter,
boosting returns.
• Corporate bonds, particularly lower-grade issues, outperformed for the quarter and the year.
Credit premiums for high-grade corporates tightened by 75 to 100 basis points. Corporate
profit growth and margins improved and demand for riskier, higher yielding assets surged,
especially among non-U.S. investors.
• Emerging market bonds outperformed most bond sectors for the quarter and the year. The
main drivers were continued improvements in credit fundamentals, as evidenced by Russia's
upgrade to investment-grade status and enhanced prospects for an upgrade for Brazil.
• Treasuries lagged Euroland bonds in 2003 but outpaced Japan, which was among the worst
performers during the year. In the fourth quarter, Treasuries underperformed most major
bond markets, although short maturity returns in the U.S., Euroland and the U.K. were
similar as investors worldwide began to expect central bank tightening given revived growth.
• Real return bonds and municipals outpaced Treasuries both in the final quarter and for the
full year. These high quality assets demonstrated their defensive characteristics as interest
rates moved higher.
Performance Attribution:
Long Term Portfolio
The Long-Term portfolio that PIMCO manages on behalf of Orange County Sanitation District
turned in a 0.23 percent return over the quarter outperforming its benchmark, the Merrill Lynch
1-5 year Government Corporate Index by 9 basis points.
This portfolio's performance was due in part to the following factors:
2
• Active management across a wide spectrum of strategies—"rolling down"a steep yield
curve, select mortgages and corporates, and Treasury Inflation Protection bonds- added
value amid volatile markets in 2003
• Below-index duration was positive for returns as rates rose
• A broader-than-index curve structure was positive for the quarter as maturities within the
index fared the worst as interest rates rose
■ A mortgage emphasis helped returns;these assets gained as lower volatility caused yield
premiums to tighten modestly
• Corporate holdings were positive as rising profits stimulated investor demand and tighter
spreads
® An allocation to real return bonds was positive as these assets outperformed more volatile
Treasuries of like duration
Liquid Portfolio
The Liquid portfolio that PIMCO manages on behalf of Orange County Sanitation District turned
in a 0.26 percent return over the quarter, outperforming the 3-month Treasury Bill Index by 2
basis points.
This portfolio's performance was due in part to the following factors:
m Near-index duration was neutral for returns
• A corporate emphasis was positive as profit growth and margins improved
it Use of higher yielding securities such as commercial paper and short-term notes contributed
to performance
112003 COP Proceeds—Future Construction"Portfolio
The COP Proceeds portfolio that PIMCO manages on behalf of Orange County Sanitation
District turned in a 0.26 percent return over the quarter,outperforming the 3-month Treasury Bill
Index by 3 basis points.
This portfolio's performance was due in part to the following factors:
Near-index duration was neutral for returns
■ A corporate emphasis was positive as profit growth and margins improved
® Use of higher yielding securities such as commercial paper and short-term notes contributed
to performance
3
Economic Outlook:
Recovery To Continue; Interest Rates Will Trend Upward
The recovery in the global economy will be sustained in 2004, with China joining the U.S. as an
engine of growth. U.S. interest rates could rise up to 100 basis points for short maturities but less
for longer maturities as markets anticipate tightening by the Federal Reserve. The timing of the
Fed move, late in 2004 or early 2005, will depend on how quickly the economy narrows its
output gap, measured by the slack in labor markets. This unused capacity, combined with
enhanced labor productivity, will keep inflation tame. Key elements of PIMCO's forecast are:
• In the U.S. economy, positive forces will outweigh negatives. The hoped for rebound in
business investment is now a reality. Massive fiscal stimulus will also provide support, as
will spending to rebuild lean inventories.
■ On the negative side, effects of large tax cuts will peak in 2004 and become a fiscal drag by
2005, while benefits of the boom in mortgage refinancing have already begun to dissipate.
Employment growth will be muted because of productivity gains and outsourcing to low cost
labor markets such as India and China.
• China's contribution to growth is tied to its currency peg with the U.S. dollar. The peg forces
China to follow the Fed's reflationary policy, fueling a boom in investment for domestic
infrastructure. This investment will promote growth in Asia and elsewhere as China imports
commodities and components to build its infrastructure. While China will eventually
succumb to pressure and revalue its currency, its currency peg will be sustained for the next
year because the peg serves Chinese and U.S. interests. China will retain competitive pricing
in dollar terms for its exports. It will use the dollars it earns to help finance the U.S. trade
deficit,thereby stemming a freefall in the dollar and mitigating the rise in U.S. interest rates.
• Japan is recovering without fiscal stimulus for the first time in a decade as healthier Japanese
companies integrate with China. Japan's fiscal policy is now focused on reform of the
banking sector. Euroland will be the laggard in 2004, but the recent collapse of the Growth
and Stability Pact opens the door for needed fiscal stimulus that will offset a stronger euro.
Defensive Posture Focused On Safe Yield Will Add Value
The bond market in 2004 will be challenging, with upward pressure on rates and full valuations
in Treasuries, most corporates and mortgages. Active managers with the resources and skill to
exploit a broad spectrum of strategies can add value, however, especially with a defensive
posture focused on safe yield and (where allowed) modest currency exposure. This approach
involves an underweight to mortgages and corporates, below-index duration and focus on
intermediate maturities. The Fed will anchor the short end of the yield curve for most of 2004,
keeping the curve steep and allowing investors focused on intermediate maturities to reap gains
by "rolling down"the curve.
4
Outside these core strategies, real return, municipal, short maturity Eurozone and emerging
market bonds remain compelling. TIPs hedge against secular inflation risk. Munis provide yields
near Treasuries and defensive characteristics in a rising rate environment. Short-term Euroland
exposure offers yields that do not reflect the low probability of central bank tightening in 2004.
Modest exposure to the euro and yen can add value as concern about the U.S. trade deficit keeps
the dollar weak. Finally, high yielding emerging market bonds are poised for another good year
as fundamentals continue to improve.
Strategy:
The following list highlights the strategies that will be used in the Long Term portfolio in the
coming months:
• A defensive posture focused on diversified sources of safe yield will add value in a
challenging environment for bonds
® Target below-index duration to protect relative returns against the risk of upward pressure on
rates
® Retain broader-than-index curve position to exploit value all along the curve;take exposure
to short maturities as the Fed will anchor this end of the yield curve
• Continue to hold mortgages to benefit from their long-term structural advantages; add value
through coupon selection
® Limit exposure to corporate bonds given their rich valuations,focus on more attractively
priced bonds
• Own TIPS,which hedge against secular inflation risk and are less volatile than nominal
bonds when rates rise
• Hold high yielding emerging market bonds, which have potential for solid returns as
fundamentals continue to improve; they also offer better value than similarly rated corporate
issues
The following list highlights the strategies that will be used in the Liquid and COP Proceeds
portfolios in the coming months:
• A defensive posture focused on diversified sources of safe yield will add value in a
challenging environment
• Target duration slightly above the benchmark to capture extra yield available from a steep
yield curve and to reap gains via "roll down"
• Given rich valuations, limit corporate holdings to issues with attractive yields and solid
credit characteristics
5
c
We hope you find this information useful. Please feel free to call us with any questions.
Sincerely,
Christine Telish, CFA John M. Miller, CFA
Vice President Senior Vice President
6
Prepared by Finance, 2/3/2004, 3:00 PM
OCSD Investment Management Program
Quarter End Portfolio Values
(Marked-to-Market)
$450,000,000
$400,000,000 - ---- -- ---
$350,000,000 - - - - -
$300,000,000 -
$250,000,000 -- - - - - - - -
$200,000,000 — - -- — - -- - ----
$150,000,000 - _ - - - ----- --- -
$100,000,000 --- - -
$50,000,000
$0
30 Sep 02 31 Dec 02 31 Mar 03 30 Jun 03 30 Sep 03 30 Dec 03
El Operating Monies 13Long-Term Operating Monies
H:\dept\agenda\FAHR\FAHR2004\0204\04-06.3
Summary of Performance Data and Portfolio Statistics
Orange County Sanitation District
Liquid Operating Portfolio
5-Year Return vs.Standard Deviation
11 �
10
PeriodsPerformance 8
c 7 I X
Total Portfolio' Citigroup
Before Fees(%) 4.65 4.03 2.78 1.22 0.86 0.54 0.26 6 r MIL 1-3 Yr. 10-Yr.Strip
10 After Fees(%) 4.51 3.89 2.63 1.06 0.74 0.45 0.23 5 Treasury i
41 ■Portfolio
4 Index
a 3
Citigroup 3 Month T-Bill Index(%)Z 4.17 3.49 2.28 1.07 0.77 0.48 0.24
2
0 1 2 3 4 5 6 7 8 9 10 11
Standard Deviation of Return (%)
of Market Value %of Duration
Summary Information
�� Ir . .� . 1 �� II 11 11
Total Market Value($MM) 38.0 91.4 Government 38 32 40 43
Quarterly Contributions($MM) -28.7 53.3 Mortgages 0 0 0 0
Estimated Annual Income($MM) 1.5 1.5 Corporates 16 8 22 13
Estimated Yield to Maturity(%) 1.3 1.1 High Yield 0 0 0 0
Estimated Duration(yrs) 0.3 0.2 Non U.S.$Developed 0 0 0 0
Average Maturity(yrs) 0.3 0.2 Emerging Markets 0 0 0 0
Average Quality AAA AAA Other 0 0 0 0
Average Coupon (%) 4.2 1.6 Net Cash Money Markets 46 60 38 44
Tracking Error(3 yrs.,%)3 0.2 0.2 Total 100 100 100 100
Information Ratio(3 yrs.)° 2.8 2.5
See footnotes in Appendix.
Summary of Performance Data and Portfolio Statistics
Orange County Sanitation District
Long Term Operating Portfolio
5-Year Return vs.Standard Deviation
10 -
91
Performance
8
0
Total Portfolio' x LBAG
s Portfolio Index
Before Fees(%) 6.52 6.01 6.16 3.22 2.03 0.57 0.23
After Fees(%) 6.37 5.86 6.01 3.08 1.93 0.50 0.20 ; 5
Q 4
Merrill 1-5 Year Gov't.Corp.(%)2 6.49 6.21 6.70 3.30 2.15 0.48 0.14 A Citigroup 3-
3 F me
2
-2 -1 0 1 2 3 4 5 6 7 8
Standard Deviation of Return(%)
%of Market Value %of Duration
Summary Information 1m;1 11 MMI Sector Allocation1 /1 11 1 11 11
Total Market Value($MM) 385.9 386.8 Government 47 46 53 53
Quarterly Contributions($MM) 54.1 0.0 Mortgages 17 16 18 19
Estimated Annual Income($MM) 16.0 16.1 Corporates 11 10 25 25
Estimated Yield to Maturity(%) 2.5 2.6 High Yield 0 0 0 0
Estimated Duration(yrs) 2.3 2.2 Non U.S.$Developed 0 0 0 0
Benchmark Duration(yrs) 2.4 2.4 Emerging Markets 0 0 0 0
Average Maturity(yrs) 2.7 2.5 Other 0 0 0 0
Average Quality AAA AAA Net Cash Equivalents:3 25 28 4 3
Average Coupon(%) 4.4 4.4 Commercial Paper/STIF 23 13 2 1
Tracking Error(3 yrs.,%)4 0.7 0.6 ST Mortgages 2 2 1 0
Information Ratio(3 yrs.)5 -0.7 -0.8 ST Corporates 5 3 1 1
ST Government 1 10 0 1
Other 1 1 0 0
Less: Liabilities -7 -1 0 0
See footnotes In Appendix. Total 100 100 100 100
Report ID:GL8251
Asset Summary Base Currency:USD
by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LIQUID OPER•PIMCO-OCSF07511102 12/31/2003 _ _ Status:FINAL
Net Unrealized
Cost Market Value % of Gain/Loss
Description Shares Par Base Base Total Base
CASH&CASH EQUIVALENTS
U.S. DOLLAR
INTEREST 262,968.26 262,968.26 0.29% 0.00
CERTIFICATES OF DEPOSIT- DOMESTIC 1,500,000.000 1,500,000.00 1,500,000.00 1.64% 0.00
FED HM LOAN BNK-LESS THAN IYR 16,200,000.000 16,154,527.66 16,154,527.66 17.68% 0.00
FEDERAL HOME LOAN MORTGAGE-LESS THAN 1 15,000,000.000 14,958,803.83 14,958,803.83 16.37% 0.00
FNMA ISSUES-LESS THAN 1YR 13,200,000.000 13,168,747.50 13,168,747.50 14.41% 0.00
MUTUAL FUNDS 159,080.160 159,080.16 159,080.16 0.17% 0.00
REPURCHASE AGREEMENTS 8,400,000.000 8,400,000.00 8,400,000.00 9.19% 0.00
TREASURY BILLS- LESS THAN 1YR 23,100,000.000 23,026,338.99 23,026,338.99 25,20% 0.00
U.S. DOLLAR 77,559,080.160 77,630,466.40 77,630,466.40 84.97% 0.00
CASH&CASH EQUIVALENTS 77,559,080.160 77,630,466.40 77,630,466.40 84.97% 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
BANKING&FINANCE 6,302,000.000 6,508,328.58 6,399,421.95 7.00% -108,906.63
U.S. AGENCIES 6,650,000.000 6,876,036.50 6,681,290.31 7.31% -194,746.19
UTILITY-TELEPHONE 650,000.000 677,046.50 652,132.00 0.71% -24,914.50
U.S. DOLLAR 13,602,000.000 14,061,411.58 13,732,844.26 15.03% -328,567.32
FIXED INCOME SECURITIES 13,602,000.000 14,061,411.58 13,732,844.26 15.03% -328,567.32
TOTAL ASSETS-BASE: 91,161,080.160 91,691,877.98 91,363,310.66 100.00% -328,567.32
1 Workbench
Asset Summary Report ID:GL8251
Base Currency:USD
by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TERM OPER-PIMCO-OCSF07522202 12/31/2003 Status:FINAL
Net Unrealized
Cost Market Value % of Gain/Loss
Description Shares Par Base Base Total Base
CASH&CASH EQUIVALENTS
U.S. DOLLAR
PENDING TRADES -2,531,623.30 -2,531,623.30 -0.65% 0.00
INTEREST 3,755,831.13 3,755,831.13 0.97% 0.00
COMMERCIAL PAPER- DISCOUNT 2,700,000.000 2,690,984.00 2,690,984.00 0.70% 0.00
FEDERAL HOME LOAN MORTGAGE-LESS THAN 1 31,300,000.000 31,209,102.61 31,209,102.61 8.07% 0.00
FNMA ISSUES- LESS THAN 1YR 17,500,000.000 17,447,688.03 17,447,688.03 4.51% 0.00
MUTUAL FUNDS 113,665.750 113,665.75 113,665.75 0.03% 0.00
TREASURY BILLS- LESS THAN IYR 37,900,000.000 37,706,336.65 37,706,336.65 9.75% 0.00
U.S. DOLLAR 89,513,665.750 90,391,984.87 90,391,984.87 23.37% 0.00
CASH & CASH EQUIVALENTS 89,513,665.750 90,391,984.87 90,391,984.87 23.37% 0.00
FIXED INCOME SECURITIES
U.S. DOLLAR
ABS-AIRPLANE RECEIVABLES 1,600,000.000 1,600,000.00 274,912.00 0.07% -1,325,088.00
ABS- HOME EQUITY 1,000,000.000 1,000,000.00 998,750.00 0.26% -1,250.00
BANKING&FINANCE 29,335,000.000 30,475,793.00 31,018,123.75 8.02% 542,330.75
COLLATERALIZED MORTGAGE OBLIGATION 2,425,788,580 2,425,788.58 2,577,279.08 0.67% 151,490.50
FHLMCMULTICLASS 1,088,725.740 1,089,885.64 1,107,419.16 0.29% 17,533.52
FHLMC POOLS 158,321.720 158,398.15 162,661.92 0.04% 4,263.77
FNMA POOLS 45,021,465.930 46,110,288.04 46,340,063.10 11.98% 229,775.06
GNMA MULTI FAMILY POOLS 3,313,859.060 3,297,217.83 3,356,281.61 0.87% 59,063.78
GNMA SINGLE FAMILY POOLS 9,341,048.670 9,492,701.17 9,835,287.38 2.54% 342,586.21
INDUSTRIAL 8,000,000.000 8,248,380.00 8,257,780.00 2.13% 9,400.00
INFLATION INDEXED SECURITIES 34,448,590.000 34,465,572.76 38,084,675.63 9.85% 3,619,102.87
INSURANCE 1,600,000,000 1,594,032.00 1,726,000.00 0.45% 131,968.00
PVT PLACEMENTS- MORE THN 1YR 752,000.000 826,199.84 826,199.84 0.21% 0.00
U.S.AGENCIES 41,138,573.590 42,215,328.96 43,837,094.83 11.33% 1,621,765.87
U.S. GOVERNMENTS 92,597,276.280 100,770,646.50 99,508,801.63 25.73% -1,261,844.87
UTILITY- ELECTRIC 4,750,000.000 4,694,370.00 5,004,355.00 1.29% 309,985.00
UTILITY-TELEPHONE 3,000,000.000 3,530,490.00 3,476,250.00 0.900/0 -54,240.00
U.S. DOLLAR 279,570,649.570 291,995,092.47 296,391,934.93 76.63% 4,396,842.46
1 Workbench
Report ID:GL8251
Asset Summary Base Currency:USD
by Asset Type with Sectors Alternate Base Currency:
Exchange Rate:
LONG TERM OPER-PIMCO-OCSF07522202 _ _ _ 12/31/2003_ _ _ Status:FINAL
Net Unrealized
Cost Market Value % of Gain/Loss
Description Shares Par Base Base Total Base
FIXED INCOME SECURITIES 279,570,649.570 291,995,092.47 296,391,934.93 76.63% 4,396,842.46
TOTAL ASSETS-BASE: 369,084,315.320 382,387,077.34 386,783,919.80 100.00% 4,396,842.46
2 Workbench
YLDANAL YIELD ANALYSIS PAGE 1
OCSF07511102 2003/12/31 RUN DATE 01/07/04
DISTRICT: LIQUID OPERATING RUN TIME 13.46.28
PAR VALUE YIN AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- - ------ ------- -------- ------------ ----------
CASH 6 CASH EQUIVALENTS
5,200,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.868 5,193,143.22 6.71
313384SRI MAT 02/04/2004 A-1+ 5,193,143.22 5.70
1,000,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.688 996,879.16 1.28
313384SS9 A-1+ 996,879.16 1.09
600,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.614 597,681.67 .77
313384SWO MAT 02/09/2004 A-1+ 597,681.67 .66
2,000,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.732 1,994,641.11 2.57
313384TN9 MAT 02/25/2004 A-1+ 1,994,641.11 2.19
4,500,000.00 FEDERAL HOME LN BK CONS DISC N .000 .000 P-1 99.742 4,489,395.00 5.80
313384UE7 MAT 03/12/2004 A-1+ 4,488,395.00 4.93
900,000.00 FEDERAL HOME LN BKS CINS DISC .000 .000 P-1 99.462 995,162.50 1.15
313384UK3 MAT 03/17/2004 A-1+ 895,162.50 .98
2,000,000.00 FEDERAL HOME LN BK CONS DISC .000 .000 P-1 99.431 1,988,625.00 2.57
313384XA2 MAT 05/19/2004 A-1+ 1,988,625.00 2.18
5,200,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.906 5,195,138.00 6.71
313396SBO MAT O1/21/2004 A-1+ 5,195,138.00 5.70
6,000,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.760 5,985,610.83 7.73
313396TPO MAT 02/26/2004 A-1+ 5,985,610.83 6.57
3,800,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.422 3,778,055.00 4.88
313396U24 MAT 03/31/2004 A-1+ 3,778,055.00 4.15
5,200,000.00 FEDERAL NATL MTG ASSN DISC HT .000 .000 P-1 99.871 5,193,305.00 6.71
313589SPI MAT 02/02/2004 A-1+ 5,193,305.00 5.70
6,000,000.00 FEDERAL NATL MTG ASSN DISC NT .000 .000 P-1 99.782 5,986,918.61 7.73
313588TF2 A-1+ 5,986,918.61 6.57
2,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.426 1,988,523.89 2.57
313588XAB MAT 05/19/2004 A-1+ 1,988,523.89 2.10
1,200,000.00 U S TREASURY BILL .000 .000 P-1 99.516 1,194,191.67 1.54
912795PKI DUE 02/12/2004 DD 08/14/2003 A-1+ 1,194,191.67 1.31
YLDAUAL YIELD ANALYSIS PAGE s 2
OCSF07511102 2003/12/31 RUN DATE s 01/07/04
DISTRICT: LIQUID OPERATING RUN TIME t 13.46.28
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION &OOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
9,200,000.00 U S TREASURY BILL .000 .000 P-1 99.757 9,177,690.00 11.66
912795PPO 0.000% 03/11/2004 DD 09/11/03 A-1+ 9,177,690.00 10.07
6,500,000.00 U S TREASURY BILL .000 .000 P-1 99.785 6,486,041.25 8.38
912795PQB 0.000% 03/10/2004 DD 09/18/03 A-1+ 6,486,041.25 7.12
6,200,000.00 U S TREASURY BILL .000 .000 P-1 99.491 6,168,416.07 7.97
912795QA2 DUE 05/27/2004 DD 11/28/2003 A-1+ 6,168,416.07 6.77
1,500,000.00 WELLS FARGO BANK NA INSTL C/D .000 1.070 100.000 1,500,000.00 1.93
9497SU2V8 1.070% 01/13/2004 DD 12/10/03 1,500,000.00 1.65
8,400,000.00 CREDIT SUISSE FB REPO .000 .970 100.000 8,400,000.00 10.85
99414G593 00.970% 01/02/2004 DD 12/24/03 8,400,000.00 9.22
159,080.16 DREYFUS TREASURY CASH MGMT .000 .807 AAA 100.000 159,080.16 .20
996085247 AAA 159,080.16 .17
-------- ------- ----------------- ----------
TOTAL CASH 6 CASH EQUIVALENTS .000 .029 77,367,498.14 100.00
77,367,490.14 84.91
FIXED INCOME SECURITIES
100,000.00 ASSOCIATES CORP NA MTN SR00043 .000 7.657 AA1 103.437 104,199.00 .75
045906BU7 7.920% 07/13/2004 DD 07/13/94 AA- 103,437.00 .11
1,000,000.00 ASSOCIATES CORP NORTH AMER .000 5.723 AA1 101.343 1,041,290.00 7.37
046003KA6 5.800% 04/20/2004 DD 04/20/99 AA- 1,013,430.00 1.11
500,000.00 BANK OF A14ERICA CORP SR GBL NT .000 6.470 AA2 102.390 518,385.00 3.72
066050CW3 6.625% 06/15/2004 DD 06/15/99 A+ 511,950.00 .56
650,000.00 BELL ATLANTIC-NEW JERSEY INC .000 5.856 AA3 100.328 677,046.50 4.74
077858AA6 5.875% 02/01/2004 DD 02/01/94 A+ 652,132.00 .72
1,350,000.00 FEDERAL FARM CR BKS CONS SYSTE .000 5.386 AAA 100.263 1,399,963.50 9.05
31331H6G7 6.40% 01/23/2004 DD 01/01/1999 AAA 1,353,555.90 1.49
1,100,000.00 FEDERAL HOME LN MTG CORP DEB .000 3.722 AAA 100.747 1,125,905.00 8.06
3134A4PH1 3.750% 04/15/2004 DD 04/15/02 AAA 1,100,219.53 1.22
YLDANAL YIELD ANALYSIS PAGE 3
OCSF07511102 2003/12/31 RUN DATE s 01/07/04
DISTRICT: LIQUID OPERATING RUN TIME 13.46.28
PAR VALUE YlrM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S—P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- — --- ------- ------- -------- ------------ ----------
4,200,000.00 FEDERAL NATL MTG ASSN DEBS .000 5.101 AAA 100.465 4,350,168.00 30.72
31359M£MI 5.125% 02/13/2004 DD 02/08/99 AAA 4,219,514.88 4.63
180,000.00 GENERAL ELEC CAP MTN 1TR 00448 .000 7.111 AAA 101.953 183,801.60 1.33
36962GUR3 7.250% 05/03/2004 DD 05/01/00 AAA 183,515.40 .20
1,000,000.00 GENERAL ELEC CAP MTN /TR 00545 .000 1.268 AAA 100.078 1,001,089.00 7.28
36962GYS7 VAR RT 05/20/2004 DD 05/20/02 AAA 1,000,780.00 1.10
1,000,000.00 LEHMAN BROS HI.DGS INC .000 6.539 Al 101,312 1,045,590.00 7.37
524908BZ2 6.6251 04/01/2004 DD 03/26/99 A 1,013,120.00 1.11
250,000.00 NCNB TEX NAT1, BK DALLAS TEX HT .000 9.204 AA2 103.218 260,870.00 1.87
628857DJO 9.5001 06/01/2004 DD 06/01/89 A+ 258,045.00 .28
627,000.00 NATIOIISBANK CORP SR NTS .000 5.975 AA2 102.515 646,650.18 4.68
638585BJ7 6.125% 07/15/2004 DD 07/23/99 A+ 642,769.05 .71
520,000.00 NORWEST FINL INC NTS .000 7.101 AA1 101.390 531,538.00 3.83
669383DG3 7.200% 04/01/2004 DD 04/07/97 AA— 527,228.00 .58
1,000,000.00 US BANCORP MTN ITR 00119 .000 5.901 AA3 101.671 1,046,310.00 7.40
91159HEY2 6.000% 05/15/2004 DD 05/10/99 A+ 1,016,710.00 1.12
125,000.00 WELLS FARGO 6 CO NEW NT .000 6.440 AA1 102.750 128,605.00 .93
949746AA9 6.625% 07/15/2004 DD 07/28/99 AA— 128,437.50 .14
-------- ------- ----------------- ---------
TOTAL FIXED INCOME SECURITIES .000 5.222 14,061,411.58 100.00
13,732,844.26 15.08
-------- ------- ----------------- ---------
TOTAL .000 .747 91,428,909.72 100.00
91,100,342.40 100.00
YLDANAL YIELD ANALYSIS PAGE t 4
OCSF07522202 2003/12/31 RUN DATE t 01/07/04
DISTRICTt LONG-TERM OPERATING RUN TIME t 13.46.28
PAR VALUE Y'II"H AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BCrOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- - ------ ------- -------- ------------ ----------
CASH 6 CASH EQUIVALENTS
900,000.00 EUROPEAN INVEST DISC D00 .00D 99.732 897,588.50 1.00
29878RCF3 03/15/2004 897,588.50 .23
20,800,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.731 20,744,004.66 23.26
313396RV7 MAT 01/15/2004 A-1+ 20,744,004.66 5.38
1,200,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.727 1,196,718.67 1.34
313396SKO MAT 01/29/2004 A-1+ 1,196,718.67 .31
4,700,000.00 FEDERAL HOME LN MTG CORD DISC .000 .000 P-1 99.661 4,684,085.28 5.25
313396SP9 MAT 02/02/2004 A-1+ 4,684,085.28 1.21
2,500,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.724 2,493,100.00 2.79
313396S27 MAT 02/12/2004 A-1+ 2,493,100.00 .65
2,100,000.00 FEDERAL HOME LN MTG CORP DISC .000 .000 P-1 99.581 2,091,194.00 2.34
313396UQ4 MAT 03/22/2004 A-1+ 2,091,194.00 .54
400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.900 399,600.00 .44
313588SR7 MAT 02/04/2004 A-1+ 399,600.00 .10
2,400,000.00 FEDERAL NATL MTG ASSN DISC NT .000 .000 P-1 99.715 2,393,155.61 2.68
313588TF2 A-1+ 2,393,155.61 .62
3,800,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.553 3,783,014.00 4.24
313568TGO MAT 02/19/2004 A-1+ 3,763,014.00 .98
8,400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.745 8,378,500.00 9.39
313588TN5 MAT 02/25/2004 A-1+ 8,378,580.00 2.17
400,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.727 399,900.00 .44
313588TV7 MAT 03/03/2004 A-1+ 398,908.00 .10
1,000,000.00 FEDERAL NATL MTG ASSN DISCOUNT .000 .000 P-1 99.735 997,350.00 1.11
313588UC7 MAT 03/10/2004 A-1+ 997,350.00 .26
1,100,000.00 FEDERAL NATL MTG ASSN DISC 000 .000 P-1 99.735 1,097,080.42 1.23
313588UK9 A-1+ 1,097,080.42 .28
1,800,000.00 GENERAL ELEC CAP DISC .000 .000 P-1 99.633 1,793,395.50 2.01
36959HD79 04/07/2004 1,793,395.50 .47
YLDANAL YIELD ANALYSIS PAGE 5
OCSF07522202 2003/12/31 RUN DATE : 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 13.46.28
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ---- ------ ------- -------- ------------ ----------
4,500,000.00 U S TREASURY BILL .000 .000 P-1 99.516 4,478,218.75 5.02
912795PK1 DUE 02/12/2004 DD 08/14/2003 A-1+ 4,478,218.75 1.16
17,000,000.00 UNITED STATES TREASURY BILL .000 .000 P-1 99.487 16,912,790.02 18.96
912795PV7 DUE 04/22/2004 DD 10/23/03 A-1+ 16,912,790.02 4.39
12,000,000.00 U S TREASURY BILL .000 .000 P-1 99.484 11,938,120.00 13.38
912795PW5 0.000% 04/29/2004 DD 10/30/03 A-1+ 11,938,120.00 3.10
4,400,000.00 U S TREASURY BILL •000 .000 P-1 99.482 4,377,207.89 4.90
912795PX3 0.000% 05/06/2004 DD 11/06/03 A-1+ 4,377,207.88 1.14
113,665.75 DREYFUS TREASURY CASH MGMT .000 .807 AAA 100.000 113,665.75 .12
996085247 AAA 113,665.75 .03
--- -- ------- ----------------- ---------
TOTAL CASH & CASH EQUIVALENTS .000 .000 89,167,777.04 100.00
89,167,777.04 23.12
FIXED INCOME SECURITIES
752,000.00 AIG SUNA14ERICA GLOBAL REG S .000 5.325 109.967 826,199.84 .27
U00907AAO 5.850% 08/01/2008 DD 08/08/01 826,199.84 .21
2,500,000.00 COMMIT TO PUR FNMA SF MTG .000 5.006 AAA 103.343 2,568,906.25 .87
01F060618 6.000% 01/01/2034 DD 01/01/04 AAA 2,583,575.00 .67
1,500,000.00 CIT GROUP INC NEW SR HT .000 5.137 A2 107.062 1,527,135.00 .54
125581ADO 5.500% 11/30/2007 DD 12/02/02 A 1,605,930.00 .42
5,000,000.00 CITIGROUP INC GLOBAL SUB NT .000 5.329 AA2 105.562 5,333,600.00 1.78
172967BP5 5.625% 08/27/2012 DD 08/26/02 A+ 5,278,100.00 1.37
79,205.45 FHLMC GROUP #G4-0353 .000 7.349 AAA 102.055 81,210.35 .02
3128DB14A2 7.500% 10/01/2004 DD 03/01/99 AAA 80,833.39 .02
7,500,000.00 FEDERAL HOME LN BK CONS BDS .000 6.708 AAA 106.210 7,997,625.00 2.68
3133HAUN7 7.1258 02/15/2005 DD 02/08/00 AAA 7,965,729.75 2.07
79,116.27 FHLMC GROUP #70-6064 .000 3.387 AAA 103.428 77,187.80 .02
31348SWZ3 6.384% 01/01/2028 DD 12/01/97 AAA 81,828.53 .02
YLDANAL YIELD ANALYSIS PAGE s 6
OCSF07522202 2003/12/31 RUN DATE 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME s 13.46.28
PAR VALUE YT'H AT CURRENT MOODY MARKET TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BGOK YIELD S-P PRICE MARKET VALUE 9 TOTAL
----------------- ----------------------------- -- ------- ------- -------- ------------ ----------
11,350,000.00 FEDERAL NATL MTG ASSN DEBS .000 4.909 AAA 106.938 11,521,271.50 4.09
31359MJX2 5.250% 06/15/2006 DD 06/22/01 AAA 12,137,508.40 3.15
845,763.78 FNMA POOL #0254510 .000 4.887 AAA 102.305 B71,136.70 .29
31371KVB4 5.000% 11/01/2017 DD 10/01/02 AAA 865,256.01 .22
178,775.18 FNMA POOL #0254631 .000 4.893 AAA 102.180 184,138.44 .06
31371KY47 5.000% 02/01/2018 DD 01/01/03 AAA 182,671.92 .05
161,395.17 FNMA POOL 00254760 .000 4.893 AAA 102.180 166,237.02 .05
31371K5V9 5.000% 06/01/2010 DD 05/01/03 AAA 164,913.08 .04
70,264.77 FNMA POOL #0254066 .000 4.893 AAA 102.180 72,372.72 .02
31371LCB3 5.000% 09/01/2018 DD 08/01/03 AAA 71,796.32 .02
372,934.60 FNMA POOL 00254953 .000 4.893 AAA 102.180 377,712.83 .12
31371LE21 5.000% 11/01/2018 DD 10/01/03 AAA 381,063.42 .10
994,777.04 FNMA POOL #0254907 .000 4.991 AAA 102.220 1,007,522.61 .34
3137ILF46 5.000% 12/01/2018 DD 11/01/03 AAA 1,016,861.01 .26
212,582.99 FNMA POOL #0323980 .000 5.694 AAA 105.371 221,949.93 .07
31374T2M0 6.000% 04/01/2014 DD 09/01/99 AAA 224,001.01 .06
32,605.47 FNMA POOL #0357328 .000 4.890 AAA 102.242 33,583.63 .01
31376J4M8 5.000% 01/01/2018 DD 01/01/03 AAA 33,336.40 .01
1,607,651.67 FNMA POOL #0357430 .000 4.893 AAA 102.180 1,625,737.76 .55
31376KA71 5.000% 09/01/2010 DD 09/01/03 AAA 1,642,693.49 .43
65,050.21 FNMA POOL 10456482 .000 5.694 AAA 105.371 68,751.73 .02
31381CCT2 6.000% 02/01/2014 DD 02/01/99 AAA 69,387.08 .02
176,700.55 FNMA POOL #0509649 .000 5.694 AAA 105.371 184,406.42 .06
31383QEWO 6.000% 09/01/2014 DD 09/01/99 AAA 186,191.30 .05
167,522.68 FNMA POOL 10535451 .000 5.694 AAA 105.371 174,904.15 .05
31384VZQB 6.000% 06/01/2015 DD 07/01/00 AAA 176,520.47 .05
3,639,256.33 FNMA POOL #0535672 .000 5.694 AAA 105.371 3,799,611.07 1.29
31384WCHI 6.000% 01/01/2016 DD 12/01/00 AAA 3,834,724.06 .99
1,204,979.34 FNMA POOL #0545296 .000 5.697 AAA 105.321 1,259,073.74 .42
31305HXZO 6.000% 11/01/2016 DD 10/01/01 AAA 1,269,097.38 .33
YLDANAL YIELD ANALYSIS PAGE 7
OCSF07522202 2003/12/31 RUN DATE 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 13.46.28
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ E TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE E TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
101,490.30 FNMA POOL #0545580 .000 5.699 AAA 105.284 105,951.77 .03
31385JCR7 6.000E 03/01/2017 DD 03/01/02 AAA 106,842.10 .03
179,016.37 FNHA POOL #0555101 .000 5.691 AAA 105.421 186,904.26 .06
31385WU23 6.000E 10/01/2017 DD 11/01/02 AAA 188,721.01 .05
804,067.43 FNMA POOL 00555285 .000 5.796 AAA 103.523 836,230.14 .28
31385W2S7 6.000E 03/01/2033 DD 02/01/03 AAA 832,398.26 .22
385,706.07 FNMA POOL 10555363 .000 4.093 AAA 102.180 397,277.25 .13
31385W5Y1 5.0001 04/01/2010 DD 03/01/03 AAA 394,113.27 .10
39,573.60 FNMA POOL. OOSS5453 .000 4.093 AAA 102.100 40,080.64 .01
31385XBW6 5.0001 OS/01/2018 DD 04/01/03 AAA 40,436.18 .01
773,260.11 FNMA POOL 1055SS28 .000 5.796 AAA 103.523 804,190.52 .27
31385XD95 6.0001 04/01/2033 DD 05/01/03 AAA 800,505.47 .21
321,924.57 FNMA POOL 00555545 .000 4.893 AAA 102.160 331,582.31 .11
31385XES2 5.000E 06/01/2019 DD 05/01/03 AAA 328,941.53 .09
1,116,156.41 FNMA POOL 10555621 .000 4.091 AAA 102.220 1,120,713.17 .38
31385XG68 5.000E 07/01/2018 DD 06/01/03 AAA 1,140,934.99 .30
65,121.39 FNMA POOL #0576386 .000 5.719 AAA 104.919 67,990.90 .02
31386XJ72 6.000E 05/01/2016 DD 05/01/01 AAA 68,324.61 .02
175,110.78 FNMA POOL 40576739 .000 5.699 AAA 105.284 192,826.60 .06
31386XV86 6.000E 04/01/2016 DD 04/01/01 AAA 184,362.92 .05
234,439.67 FNMA POOL #0590888 .000 5.690 AAA 105.309 244,769.66 .08
31387DJ91 6.000E 05/01/2016 DD 05/01/01 AAA 246,885.11 .06
185,028.00 FNMA POOL #0594002 .000 5.708 AAA 105.121 193,180.79 .06
31387T3K8 6.000E 07/01/2016 DD 07/01/01 AAA 194,503.45 .05
254,514.47 FNMA POOL #0597376 .000 5.699 AAA 105.284 265,729.01 .09
31387XT96 6.000E 09/01/2016 DD 08/01/01 AAA 267,961.97 .07
165,193.41 FNMA POOL #0605259 .000 5.699 AAA 105.284 172,461.80 .05
31388HMG1 6.000E 09/01/2016 DD 09/01/01 AAA 173,9ll.02 .05
103,238.98 FNMA POOL #0608366 .000 5.699 AAA 105.284 107,787.95 .03
31388LZ78 6.000E 10/01/2016 DD 09/01/01 AAA 108,693.70 .03
YLDANAL YIELD ANALYSIS PAGE S 8
OCSF07522202 2003/12/31 RUN DATE : 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 13.46.28
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ E TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE E TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
170,576.06 FNMA POOL #0616734 .000 5.691 AAA 105.434 178,092.06 .06
31388WEF9 6.000E 12/01/2016 DD 12/01/01 AAA 179,844.46 .05
201,682.55 FNMA POOL #0630812 .000 5.717 AAA 104.946 210,569.19 .07
31389NYH2 6.000E 02/01/2017 DD 02/01/02 AAA 211,657.21 D5
849,074.67 FNMA POOL 00632376 .000 5.691 AAA 105.421 886,487.04 .30
31309QQ50 6.000E 07/01/2017 DD 07/01/02 AAA 895,103.77 .23
486,161.90 FNMA POOL #0653116 OOD 5.691 AAA 105.421 507,583.41 .17
31390QSDO 6.000E 07/01/2017 DD 07/01/02 AAA 512,517.17 .13
195,677.54 FNMA POOL #0673280 .000 5.708 AAA 105.121 204,299.58 .06
31391P6R2 6.000E 08/01/2017 DD 11/01/02 AAA 205,698.36 .05
577,250.59 FNMA POOL 10681309 .000 4.093 AAA 102.180 594,568.10 .19
3139IY3S4 5.000E 02/01/2018 DD 02/01/03 AAA 589,832.86 .15
72,721.52 FNMA POOL #0681334 .000 4.993 AAA 102.180 74,903.16 .02
31391Y4T1 5.000E 02/01/2018 DD O1/01/03 AAA 74,306.62 .02
354,327.35 FNMA POOL #0684908 .000 4.889 AAA 102.280 358,867.17 .12
31400D3R1 5.000E 06/01/2018 DD 05/01/03 AAA 362,404.92 .09
207,000.26 FNMA POOL #0685200 .000 4.893 AAA 102.180 209,652.45 .07
31400EGH7 5.000E 03/01/2018 DD 03/01/03 AAA 211,512.22 .05
36,851.84 FNNA POOL 10685665 .000 4.993 AAA 102.180 37,957.40 .01
31400EW22 5.000E 02/01/2018 DD 02/01/03 AAA 37,655.10 .01
315,693.66 FNMA POOL #0686318 .000 4.893 AAA 102.180 325,164.47 .10
31400FPB7 5.000E 03/01/2018 DD 03/01/03 AAA 322,574.80 .08
124,019.73 FNMA POOL #0608739 .000 4.893 AAA 102.100 127,740.32 .04
31400JEL9 5.000E 06/01/2018 DD 06/01/03 AAA 126,722.98 .03
127,379.92 FNMA POOL 00689859 .000 4.893 AAA 102.180 129,011.97 .04
31400KMG8 5.000E 05/01/2018 DD 05/01/03 AAA 130,156.41 .03
751,602.57 FNMA POOL #0693834 .000 4.887 AAA 102.305 774,150.65 .25
31400PY74 5.000E 03/01/2018 DD 03/01/03 AAA 768,924.68 .20
274,843.04 FNMA POOL #0695052 .000 4.893 AAA 102.180 283,088.33 .09
31400SBV0 5.000E 05/01/2018 DD 05/01/03 AAA 280,833.77 .07
YLDANAL YIELD ANALYSIS PAGE 9
OCSF07522202 2003/12/31 RUN DATE : 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME 13.46.28
PAR VALUE YT'M AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
840,680.93 FNMA POOL 10695889 .000 4.893 AAA 102.180 865,901.35 .28
31400SC23 5.000% 05/01/2018 DD 05/01/03 AAA 859,005.17 .22
27,089.43 FNMA POOL #0697026 .000 4.893 AAA 102.180 27,902.13 .00
3140OTLF2 5.D008 05/01/2018 DD 04/01/03 AAA 27,679.90 .01
91,957.96 FNMA POOL 10698939 .000 5.691 AAA 105.434 96,009.06 .03
31400VPY2 6.000% 09/01/2017 DD 03/01/03 AAA 96,954.58 .03
277,879.67 FNMA POOL 10702210 .000 4.891 AAA 102.220 286,216.06 .09
31401ADP9 5.000% 05/01/2018 DD 05/01/03 AAA 284,048.50 .07
149,630.61 FNMA POOL 10702328 .000 4.893 AAA 102.180 151,547.76 .05
31401AHD2 5.000% 05/01/2018 DD 04/01/03 AAA 152,892.09 .04
82,358.61 FNMA POOL #0703195 .000 5.684 AAA 105.559 85,907.54 .02
314018GC3 6.000% 01/01/2017 DD 04/01/03 AAA 86,936.59 .02
302,649.05 FNMA POOL 10709148 .000 4.893 AAA 102.180 311,728.52 .10
31401HZM7 5.000% 06/01/2010 DD 06/01/03 AAA 309,245.86 .08
698,961.00 FNMA POOL #0709360 .000 4.893 AAA 102.180 707,916.44 .24
31401JB56 5.000% 07/01/2018 DD 06/01/03 AAA 714,196.18 .19
145,426.99 FNMA POOL 10709826 .000 4.893 AAA 102.180 147,290.27 .05
31401JSP4 5.000% 06/01/2018 DD 06/01/03 AAA 148,596.85 .04
265,628.29 FNMA POOL #0709911 .000 4.893 AAA 102.180 269,031.65 .09
31401JVJ4 5.000% 06/01/2018 DD 06/01/03 AAA 271,418.16 .07
27,155.10 FNMA POOL #0709963 .000 4.891 AAA 102.220 27,503.03 .00
31401JWYO 5.000% 06/01/2018 DD 06/01/03 AAA 27,757.94 .01
807,079.03 FNMA POOL #0710235 .000 4.893 AAA 102.180 831,291.41 .27
31401KBC8 5.000% 06/01/2018 DD 06/01/03 AAA 824,670.85 .21
25,800.14 FNMA POOL ID713344 .000 4.893 AAA 102.180 26,574.14 .00
3140INP52 5.000% 06/01/2018 DD 06/01/03 AAA 26,362.50 .01
336,717.67 FNMA POOL #0713365 .000 4.893 AAA 102.180 341,031.86 .11
31401NQSI 5.000% 07/01/2018 DD 07/01/03 AAA 344,057.07 .09
992,167.21 FNMA POOL #0720319 .000 4.893 AAA 102.180 1,004,879.35 .34
31401WG45 5.000% 07/01/2018 DD 07/01/03 AAA 1,013,793.38 .26
YLDANAL YIELD ANALYSIS PAGE s 10
OCSF07522202 2003/12/31 RUN DATE t 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME t 13.46.28
PAR VALUE YT'H AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
2,439,536.98 FNMA POOL 10720369 .000 4.891 AAA 102.220 2,512,723.09 .84
31401WJNO 5.000% 06/01/2018 DD 06/01/03 AAA 2,493,694.51 .65
315,691.37 FNMA POOL 10721629 .000 4.887 AAA 102.305 325,162.12 .10
31401XVW4 5.000% 07/01/2018 DD 06/01/03 AAA 322,967.08 .00
253,209.80 FNMA POOL #0723487 .000 4.893 AAA 102.180 256,058.41 .08
31402AX04 5.000% 06/01/2018 DD 06/01/03 AAA 258,728.99 .07
430,832.16 FNMA POOL #0729601 .000 4.893 AAA 102.180 436,352.20 .14
31402HRW3 5.000% 07/01/2019 DD 07/01/03 AAA 440,222.97 .11
36,580.96 FNMA POOL #0732873 .000 4.893 AAA 102.405 37,049.65 .01
31402HFN5 5.000% 11/01/2016 DD 10/01/03 AAA 37,460.62 .01
751,447.78 FNMA POOL #0737130 .000 4.093 AAA 102.180 761,075.70 .25
31402S4P9 5.000% 10/01/2018 DD 10/01/03 AAA 767,827.01 .20
592,771.45 FNMA POOL #0738211 .000 4.891 AAA 102.220 600,366.34 .20
31402UD02 5.000% 10/01/2018 DD 10/01/03 AAA 605,930.93 .16
225,351.96 FNMA POOL #0730487 .000 4.893 AAA 102.180 220,239.28 .07
31402UNC2 5.000% 10/01/2018 DD 10/01/03 AAA 230,263.93 .06
700,464.06 FN14A POOL #0740471 .000 4.691 AAA 102.220 709,438.75 .24
31402WT40 5.000% 10/01/2018 DD 10/01/03 AAA 716,014.31 .19
830,872.68 FNMA POOL #0740748 .000 4.893 AAA 102.100 841,518.23 .28
31402W5H7 5.000% 10/01/2018 DD 11/01/03 AAA 848,983.13 .22
1,183,643.76 FNMA POOL #0744008 .000 4.893 AAA 102.180 1,198,809.19 .40
31403BR54 5.000% 07/01/2010 DD 09/01/03 AAA 1,209,443.52 .31
175,843.14 FNMA POOL #0744316 .000 4.891 AAA 102.220 178,096.13 .06
31403B324 5.000% 09/01/2018 DD 09/01/03 AAA 179,746.64 .05
362,925.28 FNMA POOL 10747914 .000 4.893 AAA 102.180 367,575.26 .12
31403F3X0 5.000% 11/01/2018 DD 11/01/03 AAA 370,835.93 .10
244,330.37 FNMA POOL 10748400 .000 4.891 AAA 102.220 247,460.86 .00
31403GNR9 5.000% 08/01/2018 DD 09/01/03 AAA 249,754.48 .06
1,039,682.54 FNMA POOL #0748899 .000 4.896 AAA 102.121 1,053,003.47 .35
31403G7L0 5.000% 12/01/2018 DD 11/01/03 AAA 1,061,738.36 .28
YLDANAL YIELD ANALYSIS PAGE 11
OCSF07522202 2003/12/31 RUN DATE 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TINE 13.46.28
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 9 TYPE
SECURITY ID SECURITY DESCRIPTION B(AK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- - -- ------- ------- --------- ------------ ----------
2,550,466.67 FNMA POOL #0750377 .000 4.896 AAA 102.121 2,583,144.52 .87
31403JUA2 5.000% 11/01/2018 DD 11/01/03 AAA 2,604,572.24 .68
2,138,225.97 FNMA POOL 10750380 .000 4.896 AAA 102.121 2,165,622.00 .73
31403JUD6 5.000% 11/01/2018 DD 11/01/03 AAA 2,183,586.27 .57
194,148.32 FNMA POOL 10750445 .000 4.896 AAA 102.121 196,635.84 .06
314033WE2 5.000% 11/DI/2018 DD 11/01/03 AAA 198,266.98 .05
914,095.83 FNMA POOL 00751960 .000 4.891 AAA 102.220 925,807.69 .31
31403LM111 5.000♦ 12/01/2010 DD 11/01/03 AAA 934,388.68 .24
995,372.46 FNMA POOL 40753425 .000 4.893 AAA 102.180 1,006,881.45 .34
31403NA23 5.000% 11/01/2018 DD 11/01/03 AAA 1,017,068.49 .26
653,924.60 FNMA POOL #0755165 .000 4.893 AAA 102.180 662,303.00 .22
31403Q6A3 5.000% 12/01/2018 DD 11/01/03 AAA 668,178.13 .17
995,525.56 FNMA POOL #0756372 .000 4.893 AAA 102.100 1,007,036.32 .34
31403SJRB 5.000% 11/01/2018 DD 11/01/03 AAA 1,017,224.93 .26
45,596.00 FNMA POOL #0765165 .000 4.937 AAA 101.281 46,180.20 .01
31404DCA4 5.000% 11/01/2018 DD 11/01/03 AAA 46,180.20 .01
336,975.86 GNMA POOL #0596612 .000 6.152 AAA 105.660 353,666.69 .12
36200BYH4 6.500% 09/15/2032 DD 09/01/02 AAA 356,049.23 .09
1,220,097.30 GNMA POOL #0569358 .000 6.161 AAA 105.507 1,248,693.33 .43
362000QK3 6.500% 04/15/2032 DD 04/01/02 AAA 1,287,291.21 .33
53,160.94 GN14A POOL #0569685 .000 6.150 AAA 105.691 55,794.06 .01
3620002S2 6.500% 02/15/2032 DD 02/01/02 AAA 56,186.55 .01
90,472.27 GNMA POOL #0570019 .000 6.152 AAA 105.660 94,953.48 .03
3620ORG48 6.500% 07/15/2032 DD 07/01/02 AAA 95,593.15 .02
558,690.44 GNMA POOL #0574323 .000 6.150 AAA 105.691 586,363.08 .19
36200WAY7 6.500% 12/15/2031 DD 12/01/01 AAA 590,487.80 .15
59,181.88 GNMA POOL #0575364 .000 6.150 AAA 105.691 62,113.23 .02
36200XFD6 6.500% 11/15/2031 DD 11/01/01 AAA 62,550.16 .02
21,553.91 GN14A POOL #0587117 .000 6.150 AAA 105.691 22,621.50 .00
36201MG22 6.500% 06/15/2032 DD 06/01/02 AAA 22,780.63 .01
YLDANAL YIELD ANALYSIS PAGE t 12
OCSF07522202 2003/12/31 RUN DATE : 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME t 13.46.28
PAR VALUE YT'M AT CURRENT MOODY MARKET TOTAL COST/ E TYPE
SECURITY ID SECURITY DESCRIPTION BCPOK YIELD S-P PRICE MARKET VALUE E TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
65,141.43 GNMA POOL 10587439 .000 6.152 AAA 105.660 68,367.96 .02
3620IMS45 6.500E 11/15/2032 DD 12/01/02 AAA 68,828.54 .02
14,938.65 GNMA POOL 10421389 .000 6.130 AAA 106.035 15,678.59 .00
36206UC23 6.500E 04/15/2026 DD 04/01/96 AAA 15,840.22 .00
24,972.91 GNMA POOL #0449851 .000 6.155 AAA 105.611 26,209.85 .00
36208FWLO 6.500E 01/15/2028 DD 01/01/98 AAA 26,374.06 .01
67,365.96 GNMA POOL #0466845 .000 6.137 AAA 105.910 70,702.68 .02
36209BTA6 6.500E 06/15/2028 DD 06/01/98 AAA 71,347.40 .02
260,930.32 GNMA POOL 10468052 .000 6.137 AAA 105.910 273,854.52 .09
36209C5M4 6.500E 07/15/2020 DD 07/01/98 AAA 276,351.72 .07
212,869.16 GNMA POOL #0476041 .000 6.137 AAA 105.910 223,080.23 .07
36209MZE7 6.500E 06/15/2028 DD 06/01/98 AAA 225,450.07 .06
164,280.07 GNMA POOL #0478626 .000 6.143 AAA 105.816 172,160.38 .05
36209QVT9 6.500E 01/15/2029 DD 01/01/99 AAA 173,835.27 .05
169,313.94 GNMA POOL J0480598 .000 6.137 AAA 105.910 177,435.73 .06
36209S3F6 6.500E 10/15/2028 DD 10/01/98 AAA 179,320.66 .05
460,065.96 GNMA POOL #0485527 .000 6.150 AAA 105.691 482,853.60 .16
36209YLG1 6.500E 06/15/2031 DD 06/01/01 AAA 486,250.20 .13
519,423.75 GNMA POOL 10485610 .000 6.150 AAA 105.691 545,151.46 .18
36209YN38 6.500E 07/15/2031 DD 07/01/01 AAA 548,906.29 .14
105,649.63 GNMA POOL 10485682 .000 6.150 AAA 105.691 110,882.59 .03
36209YRB6 6.500E 08/15/2031 DD 09/01/01 AAA 111,662.50 .03
100,873.49 GNMA POOL #0485703 .000 6.150 AAA 105.691 105,869.89 .03
36209YRY6 6.500E 08/15/2031 DD 08/01/01 AAA 106,614.61 .03
10,933.58 GNMA POOL #0512235 .000 6.143 AAA 105.816 11,475.13 .00
36211GBC6 6.500E 11/15/2029 DD 11/01/99 AAA 11,569.52 .00
167,769.61 GN14A POOL #0514326 .000 6.143 AAA 105.816 175,817.30 .05
36211JLF2 6.500E 07/15/2029 DD 07/01/99 AAA 177,527.78 .05
51,641.65 GNMA POOL #0530053 .000 6.161 AAA 105.497 54,199.53 .01
36212CZS3 6.500E 04/15/2031 DD 04/01/01 AAA 54,480.31 .01
s
YLDANAL YIELD ANALYSIS PAGE s 13
OCSF07522202 2003/12/31 RUN DATE 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME 2 13.46.28
PAR VALUE Y'S'M AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION HOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ---------------------- ----'- ------- ------- -------- ------------ ----------
105,041.92 GNMA POOL #0537885 .000 6.150 AAA 105.691 110,244.77 .03
3621214RE1 6.500% 02/15/2031 DD 02/01/01 AAA 111,020.29 .03
13,368.71 GNMA POOL 10547512 .000 6.150 AAA 105.691 14,030.88 .00
36212YGV9 6.500% 04/15/2031 DD 04/01/01 AAA 14,129.50 .00
128,337.46 GNMA POOL #0547715 .000 6.150 AAA 105.691 134,493.65 .04
36212YN82 6.500% 02/15/2031 DD 02/01/01 AAA 135,641.67 .04
77,723.07 GNMA POOL #0552322 .000 6.150 AAA 105.691 81,572.79 .02
36213ESK3 6.500% 01/15/2032 DD 01/01/02 AAA 82,146.61 .02
595,133.47 GNMA POOL #0552466 .000 6.161 AAA 105.507 624,611.18 .21
36213EW36 6.500% 03/15/2032 DD 03/01/02 AAA 627,909.01 .16
457,133.87 GNMA POOL #0552659 .000 6.150 AAA 105.691 479,776.27 .16
36213E5U6 6.500% 07/15/2032 DD 07/01/02 AAA 483,151.23 .13
457,994.66 GNMA POOL #0561017 .000 6.150 AAA 105.691 480,669.21 .16
36213OG29 6.50D8 07/15/2031 DD 07/01/01 AAA 484,050.44 .13
276,925.69 GNMA II POOL #0080395 .000 3.461 AAA 101.141 274,416.05 .09
36225CNM4 VAR RT 04/20/203D DD 04/01/00 AAA 280,086.52 .07
2,477,095.70 GNMA II POOL f080408X .000 3.462 AAA 101.009 2,451,937.69 .84
36225CN28 6.500% 05/20/2030 DD 05/01/00 AAA 2,504,058.89 .65
5,000,000.00 GENERAL ELEC CAP MTN ITR 00575 .000 5.239 AAA 104.031 5,203,500.00 1.75
36962GZY3 5.450% 01/15/2013 DD 12/06/02 AAA 5,201,550.00 1.35
3,000,000.00 GENERAL MTRS ACCEP CORP SR NT .000 5.703 A3 107.406 3,064,350.00 1.08
370425SD3 6.125% 08/28/2007 DD 08/29/02 BBB 3,222,180.00 .84
3,000,000.00 GOLDMAN SACHS GROUP INC SR NT .000 4.023 AA3 102.531 3,030,030.00 1.03
38141GCSI 4.125% 01/15/2008 DD 01/13/03 A+ 3,075,930.00 .80
1,635,000.00 HOUSEHOLD FIN CORP NT .000 5.709 Al 110.125 1,772,820.00 .60
441812JW5 6.375% 10/15/2011 DD 10/23/01 A 1,800,543.75 .47
3,000,000.00 JP MORGAN CHASE 6 CO SUB NT .000 5.453 A2 105.453 3,127,260.00 1.06
46625HAT7 5.750% 01/02/2013 DD 11/25/02 A 3,163,590.00 .82
3,200,ODO.00 MORGAN STANLEY NT .000 3.620 AA3 100.140 3,195,648.00 1.08
617446HW2 3.625% 04/01/2008 DD 03/06/03 A+ 3,204,480.00 .83
YLDANAL YIELD ANALYSIS PAGE 14
OCSF07522202 2003/12/31 RUN DATE t 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 13.46.28
PAR VALUE Y'T'H AT CURRENT MOODY MARKET TOTAL COST/ 9 TYPE
SECURITY ID SECURITY DESCRIPTION SriOR YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- - ------ ------- -------- ------------ ----------
3,000,000.00 NATIONAL RURAL UTILS COOP FIN .000 6.222 A2 116.515 3,465,480.00 1.17
637432CU7 7.250% 03/01/2012 DD 03/07/02 A 3,495,450.00 .91
1,000,000.00 PHILIP MORRIS COS INC NTS .000 7.423 BAA2 101.031 1,052,600.00 .34
718154CH8 7.500% 04/01/2004 DD 04/01/97 BBB 1,010,310.00 .26
1,000,000.00 RESIDENTIAL ASSET 03-RS11 AIIB .000 1.472 AAA 99.875 1,000,000.00 .33
760985K83 VAR RT 12/25/2033 DD 12/30/03 AAA 998,750.00 .26
3,497,276.28 SBA GTD DEV PARTN 2001-20C 1 .000 5.034 AAA 108.670 3,497,276.28 1.28
03162CLJ0 6.340% 03/01/2021 AAA 3,800,490.13 .99
2,425,788.58 SBA GTD PARTN CTFS SBIC-PS O1 .000 6.250 AAA 106.245 2,425,788.58 .86
831641DD4 6.640% 02/10/2011 DD 02/21/01 NR 2,577,279.08 .67
1,600,000.00 UNITED AIRLS PASSTHRU 01-1 C .000 39.757 CA 17.182 1,600,000.00 .09
909317BC2 6.831% 03/01/2010 DD 08/22/01 A- 274,912.00 .o7
20,000,000.00 U S TREASURY NOTES .000 5.605 AAA 111.500 22,620,312.50 7.52
9128272J0 06.250% 02/15/2007 DD 02/15/97 AAA 22,300,000.00 5.78
3,435,480.00 US TREASURY INFLATION INDEX NT .000 3.277 AAA 110.625 3,746,156.05 1.28
9120273T7 3.625% 01/15/2008 DD O1/15/98 AAA 3,900,499.75 .99
14,665,170.00 US TREASURY INFLATION INDEX NT .000 3.430 AAA 112.969 16,296,705.73 5.58
9128274Y5 3.875% 01/15/2009 DD O1/15/99 AAA 16,567,095.90 4.30
57,100,000.00 U S TREASURY NOTES .000 5.353 AAA 107.406 62,782,901.47 20.69
9128276N7 05.750% 11/15/2005 DD 11/15/00 AAA 61,329,111.50 15.91
12,000,000.00 U S TREASURY NT .000 3.229 AAA 100.660 11,870,156.25 4.07
912828BG4 3.250% 08/15/2008 DD 08/15/03 AAA 12,079,200.00 3.13
3,000,000.00 VERIZON GLOBAL FDG CORP GLOBAL .000 6.365 A2 115.075 3,530,490.00 1.17
92344GAT3 7.375% 09/01/2012 DD 00/26/02 A+ 3,476,250.00 .90
1,750,000.00 VIRGINIA ELEC 6 PWR O1 SER A .000 5.371 A3 107.062 1,743,840.00 .63
927804EN0 5.750% 03/31/2006 DD 03/27/01 BBB+ 1,873,585.00 .49
16,347,940.00 US TREASURY INFLATION INDEX NT 5.817 3.114 AAA 108.375 14,422,710.98 5.97
9128272M3 3.375% 01/15/2007 DD 01/15/97 AAA 17,717,079.98 4.60
15,500,000.00 FEDERAL NATL MTG ASSN DEBS !,.967 6.705 AAA 106.261 16,154,410.00 5.55
31359MFH1 7.125% 02/15/2005 DD 02/14/00 AAA 16,470,476.70 4.27
YLDANAL YIELD ANALYSIS PAGE 15
OCSF07522202 2003/12/31 RUN DATE 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME = 13.46.28
PAR VALUE YTM AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY IO SECURITY DESCRIPTION BOOOX YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- - ---- ------- ------- -------- ------------ ----------
1,086,725.74 FHLMC MULTICLASS MTG SER E3 A 6.316 3.774 AAA 101.717 1,089,885.64 .37
3133TCE95 VAR RT 08/15/2032 DD 12/01/97 AAA 1,107,419.16 .29
725,638.94 GNMA GTD REMIC TR 2000-9 FH 6.320 1.643 AAA 100.681 725,638.94 .24
3837H4NX9 VAR RT 02/16/2030 AAA 730,580.54 .19
7,327.03 GNMA POOL #0500917 6.389 5.747 AAA 104.398 6,954.95 .00
36210SPAO 6.000% 04/15/2029 DD 04/01/99 AAA 7,649.31 .00
36,727.75 GN14A POOL 10506636 6.389 5.747 AAA 104.398 34,862.66 .01
36210YY90 6.000% 04/15/2029 DD 04/01/99 AAA 38,343.20 .01
317,562.14 GNMA POOL #0503386 6.389 5.747 AAA 104.398 301,435.94 .11
36210VF55 6.000% 03/15/2029 DD 03/01/99 AAA 331,529.92 .09
12,669.69 GNMA POOL #0499153 6.389 5.747 AAA 104.398 12,026.31 .00
36210QQE5 6.000% 02/15/2029 DD 02/01/99 AAA 13,226.96 .00
440,836.95 GNMA POOL #0496461 6.390 5.747 AAA 104.398 418,450.69 .15
36210MQN4 6.000% 01/15/2029 DD 01/01/99 AAA 460,226.90 .12
107,847.98 GNMA POOL #0491103 6 .390 5.747 AAA 104.399 102,371.34 .03
36210FRY4 6.000% 01/15/2029 DD 01/01/99 AAA 112,591.61 .03
12,287.36 GNMA POOL 40486720 6 .390 5.747 AAA 104.398 11,663.40 .00
36210AVM6 6.000% 12/15/2028 DD 12/01/98 AAA 12,827.81 .00
23,358.26 GNMA POOL #0497343 6 .390 5.747 AAA 104.398 22,172.10 .00
3621ONP45 6.000% 12/15/2020 DO 12/01/98 AAA 24,385.66 .01
16,366.70 GNMA POOL #0469688 6 .391 5.747 AAA 104.398 15,535.57 .00
36209EXR8 6.000% 11/15/2028 DD 11/01/98 AAA 17,086.58 .00
22,840.65 GNMA POOL f0467279 6 .391 5.747 AAA 104.398 21,680.78 .00
36209CCQ7 6.000% 10/15/2028 DD 10/01/98 AAA 23,845.28 .01
38,349.79 GNMA POOL 10457014 6 .391 5.747 AAA 104.398 36,402.33 .01
362080SB3 6.000% 10/15/2028 DD 10/01/98 AAA 40,036.58 .01
398,071.70 GNMA POOL #0467286 6.391 5.747 AAA 104.398 377,857.12 .14
36209CCX2 6.000% 10/15/2028 DD 10/01/98 AAA 415,580.64 .11
494,390.16 GNMA POOL #0465555 6.392 5.747 AAA 104.398 469,292.01 .17
36209AE48 6.000% 09/15/2028 DO 09/01/98 AAA 516,143.97 .13
YLDANAL YIELD ANALYSIS PAGE : 16
OCSF07522202 2003/12/31 RUN DATE : 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME : 13.46.28
PAR VALUE YTH AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BWK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- - ---- ------- ------- -------- ------------ ----------
13,190.47 GNHA POOL 10493452 6.392 5.747 AAA 104.398 12,520.65 .00
36209WBV3 6.000% 09/15/2028 DD 09/01/98 AAA 13,770.64 .00
459,044.75 GNMA POOL 10465546 6.392 5.747 AAA 104.398 435,733.89 .16
36209AET3 6.000% 08/15/2028 DD 08/01/98 AAA 479,235.56 .12
320,888.06 GNMA POOL #0468339 6.392 5.747 AAA 104.398 304,592.98 .11
36209DHQO 6.000% 08/15/2028 DD 08/01/98 AAA 335,002.13 .09
29,383.16 GN14A POOL 10438057 6.391 5.747 AAA 104.398 27,891.06 .01
36207PTN9 6.000% 05/15/2028 DD 05/01/98 AAA 30,675.56 .01
18,872.20 GNMA POOL #0469330 6.393 5.747 AAA 104.398 17,913.83 .00
36209DHF4 6.000% 05/15/2028 DD 05/01/98 AAA 19,702.28 .01
3,017,014.63 FHLMC MULTICLASS CTF SER 1620Z 6.499 5.720 AAA 104.897 2,860,874.69 1.06
3133T17A4 6.000% 11/15/2023 DD 11/01/93 AAA 3,164,757.84 .82
330,106.28 GNMA II POOL i080088M 6.705 4.295 AAA 101.859 337,409.10 .11
36225CC20 7.375% 06/20/2027 DD 06/01/97 AAA 336,325.10 .09
2,000,000.00 MARSH 6 MCLENNAN COS INC SR NT 6.717 6.476 A2 102.296 1,992,280.00 .69
57174BABS 6.625% 06/15/2004 DD 06/14/99 AA- 2,045,920.00 .53
2,500,000.00 FORD NTR CR CO GLOBAL LANDMARK 6.739 6.533 A3 102.562 2,495,900.00 .86
345397SJ3 6.700% 07/16/2004 DD 07/16/99 BBB- 2,564,050.00 .67
2,500,000.00 COUNTRYWIDE HOME LNS INC NT 6.066 6.690 A3 102.390 2,498,400.00 .86
22237UABS 6.850% 06/15/2004 DD 06/24/99 A 2,559,750.00 .66
229,651.39 GNMA II POOL #0080023 6.992 4.504 AAA 102.682 233,454.99 .07
36225CAZ9 VAR RT 12/20/2026 DD 12/01/96 AAA 235,011.10 .06
2,100,000.00 FEDERAL NATL MTG ASSN DEBS 7.113 5.800 AAA 114.226 2,030,133.00 .80
31359MEY5 6.625% 09/15/2009 DD 09/01/99 AAA 2,396,750.83 .62
1,000,000.00 FORD MOTOR CR CO NT -7.582 6.440 A3 104.812 965,170.00 .35
345397GV9 6.750% 05/15/2005 DD 05/24/93 BBB- 1,048,120.00 .27
945,920.02 WMP/HUNTOON PAIGE 1000-11150 7.604 7.319 AAA 102.471 925,375.83 .32
302998GE3 7.500% 12/01/2030 DD 10/21/99 AAA 969,290.77 .25
3,000,000.00 PACIFICORP SECD MTN 1TR 00115 -7.709 6.995 A3 104.359 2,950,530.00 1.05
69512EEU5 7.300% 10/22/2004 DD 10/22/92 A 3,130,770.00 .81
1 y
v
YLDANAL YIELD ANALYSIS PAGE 17
OCSF07522202 2003/12/31 RUN DATE 01/07/04
DISTRICT: LONG-TERM OPERATING RUN TIME 13.46.28
PAR VALUE YT'M AT CURRENT MOODY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD S-P PRICE MARKET VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
1,600,000.00 ALLSTATE CORP SR NT 7 .967 7.300 Al 107.875 1,594,032.00 .58
020002AL5 7.875% 05/01/2005 DD 05/01/00 A+ 1,726,000.00 .45
--- --- ------- ----------------- ---------
TOTAL FIXED INCOME SECURITIES .375 5.222 291,995,092.47 100.00
296,391,934.93 76.91
-------- ------- ----------------- ---------
TOTAL .359 4.986 381,162,069.51 100.00
385,559,711.97 100.00
----------------- ---------
Orange County Sanitation District
Investment Transactions and Balances in the
State of California Local Agency investment Fund
December 31, 2003
Par Value Book Value Market Value Rate Yield
Balance
December 1,2003 $31,000,246 $31,000,246 $31,000,246 1.545 1.545
Deposits:
12/11/2003 9,700,000 9,700,000 9,700,000 1.545 1.545
12/18/2003 4,000,000 4,000,000 4,000,000 1.545 1.545
Total Deposits 13,700,000 13,700,000 13,700,000 1.545 1.545
Withdrawals:
12/3/2003 (500,000) (500,000) (500,000) 1.545 1.545
12/4/2003 (2,600,000) (2,600,000) (2,600,000) 1.545 1.545
12/10/2003 (2,000,000) (2,000,000) (2,000,000) 1.545 1.545
12/19/2003 (3,500,000) (3,500,000) (3,500,000) 1.545 1.545
12/23/2003 (2,000,000) (2,000,000) (2,000,000) 1.545 1.545
Total Withdrawls (10.600,000) (10,600,000) (10,600,000) 1.545 1.545
Balance
December 31,2003 $34,100.249 $34,100,246 $34,100,249 1.545 1.545
FAHR COMMITTEE Meeting Date To Bd.of Dir.
i
02/11/04 02/25/04
AGENDA REPORT Item Number Item Number
FAHR04-07 14 e
Orange County Sanitation District
FROM: Gary G. Streed, Director of Finance
Originator: Michael D. White, Controller
SUBJECT: SWAP REPORT FOR THE QUARTER ENDED DECEMBER 31, 2003
GENERAL MANAGER'S RECOMMENDATION
Receive and file Swap Report for the quarter ended December 31, 2003.
SUMMARY
In August 2003, the Committee approved an Interest Rate Exchange Agreement Policy that
provides guidelines for the use of hedging products including swaps, caps, floors, collars, options,
and other similar financial instruments (collectively, "hedging products") in connection with the
financial exposure of the District, including interest rate exposure. As required by this policy,
following are the quarterly monitoring and reporting requirements and status at
December 31, 2003:
Requirement
Highlight all material changes to hedging product agreements including counterparty downgrades
and/or terminations.
Results:
The District currently utilizes two hedging product agreements, the AIG Swap agreement and the
Soc Gen Swap Agreement. The AIG Swap agreement was originally entered into in
October 1, 1992 in order to convert the Refunding Certificates of Participation, 1992 Series (the
"1992 Certificates") to a fixed rate obligation. There have been no material changes to the
agreement. American International Group, Inc.'s current ratings are AAA and Aaa from Standard
and Poor's and Moody's, respectively.
The Soc Gen Swap Agreement was originally entered into in September 1, 1993 in order to
convert the Refunding Certificates of Participation, 1993 Series (the "1993 Certificates) to a fixed
rate obligation. There have been no material changes to the agreement. Soc Gen's current
ratings are AA- and Aa3 from Standard and Poor's and Moody's, respectively.
Requirement
Summarize any new hedging products entered into by the District since the last report.
Results:
No new hedging products have been entered into by the District since the last report covering the
period ended September 30, 2003. As stated above, the District utilizes only two hedging product
agreements, the AIG Swap agreement entered into in 1992, and the Soc Gen Swap Agreement,
entered into in 1993.
Requirement
Summarize any planned hedging product transactions and the impact of such transactions on the
District; a description of each outstanding Hedging Product agreement, including a summary of its
terms and conditions, the notional amount, volume, rates, maturity, the estimated market value of
each agreement, the method of procurement (competitive or negotiated), and the full name,
description and credit ratings of the agreement's counterparty and if necessary, its applicable
guarantor.
Results:
The District currently is not planning any additional hedging product transactions at this time.
Requirement
List any amounts which were required to be paid and received, and any amounts which actually
were paid and received under each outstanding hedging product over the last quarter;
Results:
Following are the amounts that were actually paid and received under the District's two swap
agreements. All amounts required to be paid and received were actually paid and received.
1992 1993
Certificates Certificates
AIG Swap Soc Gen Swap
October
Paid by the District to the Swap Provider _ $161,500.00
Paid by the Swap Provider on behalf of the District _ $ (34,815.07)
August
Paid by the District to the Swap Provider _ $161,500.00
Paid by the Swap Provider on behalf of the District _ $ (34,279.46)
September
Paid by the District to the Swap Provider _ $161,500.00
Paid by the Swap Provider on behalf of the District _ $ (37,454.18)
Requirement
List any credit enhancement, liquidity facility or reserves associated therewith including an
accounting of all costs and expenses incurred, whether or not in conjunction with the procurement
of credit enhancement or liquidity facilities under each outstanding Hedging Product.
Results:
Credit Enhancements, liquidity facility or reserves associated with the 1992 Certificates AIG Swap:
-Lloyds Bank Letter of Credit cost for the quarter ended October 31, 2003: $72,485.42
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204Utem 14(e).SWAP Report.doc
Revised: 06/04/03 Page 2
Credit Enhancements, liquidity facility or reserves associated with the 1993 Certificates Soc Gen
Swap:
-Soc Gen Irrevocable Letter of Credit: No costs or expenses incurred during the quarter ended
December 31, 2003.
Credit Enhancements, liquidity facility or reserves associated with the 2000 Certificates:
-Dexia Public Finance Bank Standby Certificate Purchase Agreement Commitment Fee for the
quarter ended October 31, 2003: $73,766.34
Requirement
An assessment of the counterparty risk, termination risk, and other risks associated therewith,
which shall include the value of the collateral posted by counterparties and the District, the
aggregate marked-to-market value for each counterparty and relative exposure compared to other
counterparties, and a calculation of the District's Value at Risk for each counterparty.
Results:
The counter party risk and termination risk has been calculated by Public Resources Advisory
Group (PRAG). PRAG used the value at risk methodology in determining the county parry risk at
maximum exposure over the term of the Swap Agreements. Counterparty exposure limits are
important because they create diversification, so if any one counterparty goes bankrupt, the
District's total loss would be limited to only one counterparty. The termination risk is what the
District would have to pay the counterparty upon a termination of the Swap Agreement.
1992 1993
Certificates Certificates
AIG Swap Soc Gen Swap
Counterparty Risk $ 8,360,178 $6,621,880
Termination Risk $14,169,481 $2,968,809
Requirement
The report shall also include a copy of this Policy in the quarter after it is adopted or subsequently
modified.
Results:
No modifications have been made to the Policy since its adoption.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
PROJECT/CONTRACT COST SUMMARY
N/A
H:ldept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(e).SWAP Report.doc
Revised: 06/04/03 Page 3
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ATTACHMENTS
None.
H:\deptlagenda\Board Agenda Reports\2004 Board Agenda Reports\020411tem 14(o).SWAP RepoA.doc
Revised: 06/04/03 Page 4
i
Meeting Date To M.of Dir.
FAHR COMMITTEE oz/11�o4 oz/zs�o4
AGENDA REPORT Item Number Item Number
FAHR04-08 14
Orange County Sanitation District
FROM: Lisa Tomko, Director of Human Resources
Originator: Jeff Reed. Human Resources Manager
SUBJECT: CHANGES AND ADDITIONS TO HUMAN RESOURCES POLICIES AND
PROCEDURES AS AUTHORIZED BY RESOLUTION 98-33.
GENERAL MANAGER'S RECOMMENDATION
Adopt Resolution No. OCSD 04-05, amending Resolution No. OCSD 98-33, amending Human
Resources Policies and Procedures Manual.
SUMMARY
The attached policies are routine updates or additions to maintain consistent language with the
Memorandums of Understanding (MOU) and/or new legislation or to explain procedures more
clearly.
PRIOR COMMITTEE/BOARD ACTIONS
Human Resources Policies and Procedures Manual revisions were presented at the October
2003 FAHR and Board of Directors meetings.
PROJECT/CONTRACT COST SUMMARY
None
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
Policy Number
and Subject From To Reason for Change
13150.00 Recruitment Current Language. Revised Language. MOU changes.
C10.10 Classification and Compensation Current Language. Revised Language. MOU changes.
C20.10 Equity Adjustments Current Language. Revised Language. MOU changes.
C40.00 Extraordinary Services Current Language. Revised Language. MOU changes.
Compensation for Exempt Employees in
the Professional Group
H:,dept,agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\ltem 14lq.HR Policies.doc Revised: 2/18/2004
Page 1
Policy Number From To Reason for Change ,
and Subject
•
C170.00 California Wastewater Current Language. Revised Language. MOU changes.
Treatment Plant Operator's Grade V
Certificate Pa
C190.00 Variable Non Base Pay Current Language. Revised Language. MOU changes.
D10.00 Leave-of-Absence With Pay Current Language. Revised Language. MOU changes.
D30.00 Holidays Current Language. Revised Language. MOU changes.
D50.00 Insurance Current Language. Revised Language. MOU changes and
surviving benefit addition.
D110.00 Catastrophic Illness Leave Current Language. Revised Language. Surviving benefit addition.
Donation Program
F50.00 Problem Solving Procedure Current Language. Revised Language. MOU changes.
F60.00 Grievance Procedure Current Language. Revised Language. MOU changes.
F70.00 Discipline Current Language. Revised Language. MOU changes.
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Resolution No. OCSD 04-XX
2. Policy B150.00, Recruitment
3. Policy C10.10, Classification and Compensation
4. Policy C20.10, Equity Adjustments
5. Policy C40.00, Extraordinary Services Compensation for Exempt Employees in the
Professional Group
6. Policy C170.00, California Wastewater Treatment Plant Operator's Grade V Certificate Pay
7. Policy C190.00, Variable Non Base Pay
8. Policy D10.00, Leave-of-Absence With Pay
9. Policy D30.00, Holidays
10. Policy D50.00, Insurance
11. Policy D110.00, Catastrophic Illness Leave Donation Program
12. Policy F50.00, Problem Solving Procedure
13. Policy F60.00, Grievance Procedure
14. Policy F70.00, Discipline
H:\dept\agenda\Board Agenda ReponM2004 Board Agenda Repons\0204\Item 14(f).HR Policies.doc Revised: 211&2004
Page 2
. RESOLUTION NO. OCSD 04-05
a
AMENDING RESOLUTION NO. OCSD 98-33
A RESOLUTION OF THE BOARD OF DIRECTORS OF ORANGE COUNTY
SANITATION DISTRICT AMENDING THE HUMAN RESOURCES POLICIES
AND PROCEDURES
The Board of Directors of Orange County Sanitation District,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1: That Exhibit"A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No. B150.00, Recruitment, set forth in Attachment No. 1, attached hereto and
incorporated herein by reference.
Section 2: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No. C10.10, Classification and Compensation, set forth in Attachment No. 2,
attached hereto and incorporated herein by reference.
Section 3: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.C20.10, Equity Adjustments, set forth in Attachment No. 3, attached hereto
and incorporated herein by reference.
Section 4: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.C40.00, Extraordinary Services Compensation for Exempt Employees in
the Professional Group, set fourth in Attachment No. 4, attached hereto and incorporated herein
by reference.
Section 5: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.C170.00, California Wastewater Treatment Plant Operator's Grade V
Certificate Pay, set fourth in Attachment No. 5, attached hereto and incorporated herein by
reference.
Section 6: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.C190.00, Variable Non Base Pay, set fourth in Attachment No. 6, attached
hereto and incorporated herein by reference.
Section 7: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.D10.00, Leave-of-Absence With Pay, set fourth in Attachment No. 7,
attached hereto and incorporated herein by reference.
Section 8: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.D30.00, Holidays, set fourth in Attachment No. 8, attached hereto and
incorporated herein by reference.
Section 9: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.D50.00, Insurance, set fourth in Attachment No. 9, attached hereto and
incorporated herein by reference.
Section 10: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.D110.00, Catastrophic Illness Leave Donation Program, set fourth in
Attachment No. 10, attached hereto and incorporated herein by reference.
H:Wept\agenda\Board Agenda Repons\2004 Board Agenda Roports\0204V1em 14 ftHR Policies.doc Revised: 2J1 MW4
Page 3
r
Section 11: That Exhibit "A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.F50.00, Problem Solving Procedure, set fourth in Attachment No. 11,
attached hereto and incorporated herein by reference.
Section 12: That Exhibit"A" of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.F60.00, Grievance Procedure, set fourth in Attachment No. 12, attached
hereto and incorporated herein by reference.
Section 13: That Exhibit r'Ar' of Resolution No. OCSD 98-33 is hereby amended by
amending Policy No.F70.00, Discipline, set fourth in Attachment No. 13, attached hereto and
incorporated herein by reference.
Section 14: That all other terms and conditions of Resolution No. OCSD 98-33, as
previously recommended, shall remain in full force and effect.
Section 15: That all future amendments to Resolution No. OCSD 98-33 be made by
Resolution.
PASSED AND ADOPTED at a regular meeting held February 25, 2004.
Chair
ATTEST:
Board Secretary
H:ldept\agenda\Board Agenda Reports\2004 Board Agenda Reponst0204Utem 14(f).HR Policies.doc Revised: 2/1=004
Page 4
Orange County Policy Number: B150.00
Sanitation District Effective Date: Gatallater 22, 2003
February25, 2004
Subject: Recruitment Supersedes: FebFUaFy 26,2-003
Octobe>�22,,2�03
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for toe
Orange Cnurity Santtati6 District's {.00SD';} recruitment activities.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all District OCSD departments, divisions, sections and employees.
3.0 DEFINITIONS
3.1 Recruitment is the process of attracting qualified individuals to apply for jobs that are
open within the organization, whether internal or external.
3.2 Internal recruitment means considering only present employees as applicants for job
openings within the organization.
3.3 Open recruitment means attracting applicants from outside the organization, as well as
internally to apply for job openings within the organization.
3.4 Probationary Period- Initial as defined in applicable MOU provisions, includes at least the
first 6 months or 26 weeks of employment with the District OC.SD beginning with the date
of hire. This period is regarded as an extension of the hiring process, and provides an
opportunity for both the employee and 9i9trist-0CSD management to assess, over a
substantial period of time, whether or not the hiring decision was appropriate.
3.5 Probationary Period- Promotional as defined in applicable MOU provisions, includes at
least the first 6 months or 120 days of employment with the District dCSD, beginning with
the effective date of promotion. This period is regarded as an extension of the selection
process, and provides an opportunity for both the employee and District 601SD
management to assess, over a substantial period of time, whether or not the decision
was appropriate. "At-will"employees do not serve a promotional probationary period.
3.6 Probed hkV Period-Reassignment or Lateral"Transfer as�lefined m-pp :MOU
provisions,includes at least the first26 weeks flfgemployment with OCSd,beginning with
the effect♦ve date of;the"reass�gnme►tt ar lateral t7rgnsfer :This=penod prQrrfdes'an
opportun ity for b'h"the employee and aCSt3 rnanagernent to assess,oVeta,e substantial
, , csipop mth oced v rWasappropriate.
3.7 Relative is any person related by one of the following familial relationships to any
employee at the agency: spouse, mother, father, brother, sister, child, grandmother,
grandfather, grandchild, cousin, aunt, uncle, mother-in-law,father-in-law, brother-in-law
or sister-in-law
H:Weptlagenda\Board Agenda Reports12004 Board Agenda Reports\0204Vtem 14(Q.HR Policies.doc Revised: 2/1 W004
Page 5
4.0 POLICY
0
4.1 It is taae-Bistist's OCSD's policy to provide nondiscriminatory, lawful and
consistent guidelines and procedures to its agency recruitment processes,
whether internal or open.
5.0 PROCEDURE
5.1 PERSONNEL REQUISITIONS
5.1.1 A personnel requisition is the first step for the hiring manager/supervisor to
communicate staffing needs to Human Resources; however, if the recruitment
requires testing (hands-on, written, essay, etc.) as part of the interview process,
the testing methods must be reviewed for validity and reliability by Human
Resources prior to the initiation of a personnel requisition.
5.1.2 The hiring supervisor completes the personnel requisition and receives the
appropriate signatures required before sending it to Human Resources.
5.1.3 Human Resources reviews the requisition to make sure the qualifications are
appropriate for the position. If changes are necessary, Human Resources will
work with the appropriate manager/supervisor.
5.2 EMPLOYMENT OPPORTUNITY BULLETINS/POSTINGS
5.2.1 The recruiter prepares the employment opportunity bulletin, also known as a
posting. Each posting will include the following information:
• Wage range
• Department
• Brief job description
• Required qualifications
• Desired qualifications
• Posting/closing dates
• Procedure for applying
• Brief benefits overview
5.2.2 The recruiter provides the draft posting to the hiring manager for approval.
5.2.3 Upon approval, all job postings (except Intern positions) are advertised as
internal recruitments for ten business days unless authorized by the HR Director
and extenuating circumstances apply. If there are at least two internal applicants
and they meet the minimum qualifications for the position,those applicants will
be interviewed. If an internal applicant is not selected or if there are no internal
applicants,the position shall be advertised as an external recruitment.
5.2.4 Department representatives are provided with postings for communication within
their designated departments.
5.2.5 Bulletin boards at Plant No. 1 where Employment Opportunity Bulletins will be
regularly posted are located in the Control Center, and Warehouse, outside the
Human Resources Office and in the Administration Building lunchroom.
5.2.6 Internal Job Announcement Notifications are sent via e-mail to all Bist,x OCSD
employees for internal and external recruitments.
5.2.7 Employment Opportunity bulletin boards at Plant No. 2 are located in the
Operations Center, Maintenance Office, Maintenance lunchroom and
Warehouse.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\1tem 14(t).HR Policies.doc Revised: 2/1t372004
Page 6
• 5.2.8 Employment Opportunity Bulletins may also be found in other convenient areas
throughout both plants.
5.3 ADVERTISING
5.3.1 Advertising for positions at the 9is#ist OCSD ensures positions are filled with the
best-qualified candidate for the job.
5.3.2 All positions are advertised on the Internet.Technical and hard-to-fill positions
are advertised on trade specific websites.
5.3.3 Trade magazines and other forms of advertising may be used for hard-to-fill or
specialized positions.
5.4 APPLICANT SCREENING
5.4.1 Resumes or applications that are received are reviewed and selected for
further consideration only 9 they meet the minimum job requirements.
5.4.2 The recruiter forwards copies of the resumes or applications of qualified applicants to the hiring
supervisor for review. Originals remain in HR in the Recruiting files.
5.4.3 All materials(e.g.,applications,resumes,interviewer notes,interview packets,packets,etc.)
submitted by applicants/candidates during the interview process are confidential and are considered
8istrist OCSD property and must be returned to Human Resources upon completion of the hiring
process.
5.5 INTERVIEW PROCESS
5.5.1 The interview panel members are selected along with the interview
date(s). Applicants are scheduled, interview questions are prepared, and
the interview panel conducts the actual interview.
5.5.2 The recruiter and the hiring supervisor work together to select the
interview panel. However, the recruiter makes the final decision to ensure
consistency. The ideal interview panel will include the hiring supervisor,
one employee within the department, two individuals outside the
department, and the recruiter, or another member of the Human
Resources Department. Normally, subordinates within the hiring
department are not included in the interview panel.
5.5.3 The recruiter and the hiring manager work together to establish a set of questions for the candidates.
5.5.4 The recruiter prepares interview packets and distributes them to the interview
panel. Packets include:
• An overview of the interview process
• A copy of the interview schedule
• A copy of the employment bulletin opportunity/posting
• Copies of candidate applications
• Interview questions and evaluation forms for each candidate
Wdepllagenda\Board Agenda RepoAs\2004 Board Agenda Reporls\=Mltem 14(1).HR Policies.doc Revised: 2tl&2004
Page 7
5.5.5 The interview panel will meet at least one half hour before the interview. The
panel will finalize the interview questions that are recommended by the hiring
supervisor and the recruiter. The panel may add or delete questions. The panel
will gain an understanding from the hiring supervisor about the criteria with which
to select the ideal candidate, and adopt the appropriate criteria.
5.5.6 The recruiter facilitates the interview process. When interviews are completed,
the interview panel members evaluate each candidate interviewed. The top
three candidates are identified and ranked in order of preference based on the
criteria established prior to the interview. The recruiter collects the documentation
at the end of the interview process.
5.5.7 The final candidate is selected from the top three candidates when a majority decision is reached. If
a majority decision cannot be reached,the General Manager or designee will make the final
determination based on the input of the hiring supervisor,the panel,and the HR representative. If a
majority decision is reached,and the hiring supervisor does not agree with the final decision,he or
she may appeal for a final decision from the General Manager or designee.
5.6 RECRUITMENT APPEALS PROCESS
5.6.1 Employees should bring recruitment process and decision-making issues to the
attention of the Human Resources Manager as soon as possible. The manager
will review the issue and provide a written response within five business days
from the issue notification date.
5.6.2 If the issue is not resolved to the employee's satisfaction, the employee may file
a written statement concerning the problem to the Director of Human Resources
within ten business days of receipt of the manager's decision. Upon request by
either party, a meeting may be held to discuss the issue and establish remedies.
5.6.3 The employee will be provided a written response from the Director of Human
Resources within ten business days after their statement is received. The
decision of Human Resources is final (see policy F50,00, Problem Solving
Procedure and F60.00, Grievance Procedure).
5.6.4 Time limits may be extended for cause upon mutual consent of the parties.
5.7 EMPLOYMENT OFFERS
5.7.1 The recruiter and hiring supervisor determine an appropriate starting salary for all candidates,except
those designated as"at-will"employees,based on a Salary Offer Analysis. This analysis will include
the applicant's:
• Qualifications
• Years of experience
• Educational background
• Salary history
• Parity within the department
5.7.2 The HR Compensation Analyst reviews the recommended salary,and approves or makes additional
recommendations.All salary offers that are either at or beyond the midpoint step 4 of the range will
require the approval of the Human Resources Director(or designee). Under no circumstances
should panel members(excluding the HR representative)or any other Bis#fst OCSD employee
discuss salary offers with candidates or make promises of any kind. HR staff are the only
employees authorized to engage in salary discussions with job candidates.
5.7.3 The recruiter completes a status change form for the candidate and initiates the
background investigation. Background investigation results are provided to the
candidate by the-District's OpSD.'s background screening firm.
5.7.4 When the status change form is approved and the backgroundinvestigation is
clear, the recruiter makes a verbal employment offer to the candidate,which is
contingent upon results of a pre-employment physical and drug screening. Upon
acceptance of the employment offer, the recruiter sends regret letters to
H:Wept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204U1em 14(f).HR Policies.doc Revised: 2l1&2004
Page 8
unsuccessful candidates. Internal candidates are contacted personally prior to
receiving regret letters.
5.7.5 The recruiter schedules the pre-employment physical for the candidate, works
with the supervisor to establish a potential start date and prepares a formal offer
letter for the candidate.
5.7.6 When the Safety Manager(or designee) has cleared the pre-employment
physical results,the recruiter will contact the applicant to confirm the employment
offer.
5.7.7 The recruiter coordinates the candidate's start date.
6.0 EXCEPTIONS
6.1 EMPLOYMENT OF FORMER EMPLOYEES
6.1.1 Employment of former employees for full-time equivalent or part-time positions
shall be subject to and conducted in accordance with this policy.
6.1.2 Employment of a former employee is subject to the approval of the General
Manager and the Director of Human Resources.
6.1.3 In all cases, approval of the General Manager and the Director of Human
Resources shall be received prior to an offer of employment to a former
employee.
6.1.4 The General Manager may, with the written approval of the Board Chair, employ
on a part-time or as-needed basis, a former employee retired from thA District
LSD;when the individual possesses knowledge and expertise of unique and
particular benefit to thA D+strist OCSD and when the services are required.The
length of service performed in any one year shall be limited in accordance with
the provisions prescribed by the Orange County Employees' Retirement System
(currently 120-day maximum).
6.1.5 Part-time or as-needed service shall be compensated at the same current hourly
rate of the retired employee's position classification, or if no such classification
exists, at a rate not to exceed that paid for the most comparable classification.
The retired employee shall not be entitled to receive any benefits otherwise
payable to Dis#rir-At OCSD employees. In the event any employment under this
provision involves work assignments outside of Orange County,the current
expense reimbursement policy established for regular employees will apply.
6.1.6 If any former employee commences doing business wherein the employee,
his/her spouse, or members of his/her immediate family are sole proprietors, or
majority or controlling shareholders or owners of a corporation, partnership or
other business entity, such business shall not be retained as an independent
contractor or consultant to provide service directly to the D',strint OCSD for a
period of one year after leaving D+striat's OCSD's employment. Thereafter, said
business entity shall be allowed to contract with the-D+stFist OCSD upon
compliance with all resolutions and regulations of the Di6trist OCSD,then in
effect, relating to the procurement of services.
6.1.7 If any former employee becomes employed by any firm or business entity in
which the former employee, his/her spouse or members of his/her immediate
family own less than the majority or controlling interest in said entity, said entity
shall not be prohibited from contracting with the District OCSD. However, the
former employee shall not perform work on District-OCSD projects for a period of
one year after leaving District-OCSi?employment; nor shall such former
employee contact District OCSD officers or employees for the purpose of
H:\dopt\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(1).HR Policies.doc Revised: 211WO04
Page 9
attempting to influence any District C)CSD decision, including but not limited to,
the award of contract, issuance of permits, or compromise of administrative civil
penalties, for a like period of one year. Said services shall be obtained only in
accordance with all rules and procedures of the-Bistrist Ob8b relating to
procurement.
6.1.8 Any Distrint 668D employee who receives an offer of employment or a request
to discuss potential employment from any person or business entity performing
services for the DistFist OGSO shall report such contact to his or her immediate
supervisor, who shall decide whether any change in assignment is necessary or
appropriate while the offer or discussions are pending.
6.1.9 The prohibitions of this policy may be waived by the Finance, Administration and
Human Resources Committee of the Boards of Directors if, on a case-by-case
basis, it is determined to be in the best interests of the-District CSD to do so.
6.2 EMPLOYMENT OF RELATIVES
6.2.1 Except as otherwise provided by law, no employee, prospective employee or
applicant shall be denied employment or benefits of employment solely on the
basis of his or her familial relationship with an employee of the agency or a
member of the Board of Directors.
6.2.2 ThR BisWst 408D will make reasonable efforts to assign job duties to eliminate
any potential for an adverse impact on supervision, safety, security or morale, or
potential conflicts of interest.
6.3 LATERAL TRANSFERS
6.3.1 Employees may request a lateral transfer to a vacant position in the same
classification in another department providing they have demonstrated at least
six months of continuous competent or above performance in their current
position, and the transfer is of benefit to the-District UCSD.
6.3.2 Employees who wish to be considered for a lateral transfer should notify Human
Resources in writing of their intent. In the event a transfer is approved and
accepted by the employee, the department from which the employee is
transferring may determine the effective date based upon operational
requirements and a reasonable period of time to acquire a suitable replacement.
6.3.3 Lateral transfers do not normally involve increased levels of duties and
responsibilities, or otherwise qualify as promotions, and therefore do not involve
salary adjustments.
6.3.4 In the event an adjustment appears warranted based on extenuating
circumstances, the adjustment must have written approval from the department
head prior to being extended to the employee.
7.0 PROVISIONS AND CONDITIONS
7.1 The interview process for Intern positions shall be an abbreviated version of the process
outlined in section 5.5 and will be administered by the appropriate division
manager/supervisor and a Human Resources representative.
7.2 The DistF+st's OCSD's Board of Directors must approve unbudgeted positions for new
hires or promotions before any internal or open recruitment effort is initiated.
7.3 Hiring an individual into a budgeted position requires the approval of the Department
Head and General Manager.
Wdepbagenda\Board Agenda Reports12004 Board Agenda Reports\0204\1tem 14(0.HR Poficies.doc Revised: 2/18/2004
Page 10
7.4 Promoting an individual into a budgeted position requires the approval of the Division
Manager, Department Head or General Manager.
7.5 Tie-Distron (3GSD'retains the right to refuse to place a relative under the direct
supervision of ah. Distrint OCS0 employee where such has a potential for creating an
adverse impact on supervision, safety, security or morale.
.....................
7.6 Ths B+s�ist OCSD retains the right to refuse to place relatives in the same department,
division, or facility where such has a potential for creating an adverse impact on
supervision, safety, security or morale, or involves potential conflicts of interest.
7.7 INITIAL PROBATIONARY PERIOD
...................
7.7.1 All persons hired by the DistFist UCSD, except those designated as"at-will"
employees, are considered to be probationary employees for a period of at least
the first 26 weeks or 6 months of employment, depending upon the applicable
MOU provisions, beginning with their date of hire.This probationary period is
regarded as an extension of the hiring process, and provides an opportunity for
both the employee and District's OCSD's management to assess, over a
substantial period of time, whether or not the hiring decision was appropriate and
resulted in a relationship that adequately meets the needs of both the individual
and the-District OCSD.
7.7.2 The probationary period may be extended by mutual agreement between the
Dis#iet OCSD and the employee, prior to the expiration of the probationary
period. An employee's probationary period may be extended when there is a
need to further assess the individual's abilities to satisfactorily perform the duties
required for their job classification. Probationary employees may be released by
the-D rWnt OCSD at any time during the probationary period (including any
extension) without cause or reason.
7.7.3 A probationary employee's work performance is closely monitored during this
period to ensure that the employee understands the duties, responsibilities and
management expectations of the position, and to allow an opportunity for the
supervisor or manager to provide proper direction and guidance. Employees who
do not demonstrate the potential for meeting performance expectations for their
position within a reasonable period of time may be released prior to the
completion of the Probationary Period. Probationary employees shall serve at the
will of the-Di6#ist OCSD during this period. In the event of release of a
probationary employee, the employee shall not be entitled to receive any
severance pay.
7.8 PROMOTIONAL PROBATIONARY PERIOD
7.8.1 All promoted employees, except those designated as"at-will" employees, shall
serve a promotional probationary period lasting at least 120 days or 6-months,
depending upon the applicable MOU provisions, beginning with the effective date
of promotion. This period is regarded as an extension of the selection process,
and provides an opportunity for both the employee and the Distrint OCSD
management to assess, over a substantial period of time, whether or not the
decision was appropriate.
7.9 REFERENCE CHECKS
7.9.1 Employment with the-Distrirt OCSD is contingent upon a pre-employment
screening process which includes a physical examination, drug/alcohol test and
background investigation. Candidates must also be able to provide
documentation authorizing their legal right to work in the United States as per the
Immigration Reform and Control Act of 1986.
Wdept4igenda\Board Agenda Reports\2004 Board Agenda Reports\0204Utem 14(1).HR Poficies.doc Revised: 2/182004
Page 11
7.9.2 The-PirWnt(JCSD may verify information contained in the job application of a
prospective employee with the prospective employee's authorization.
7.9.3 Inquiries to Bis#�t 0$I);employees regarding reference or employment
verification checks of former or present employees, shall be discussed with or
referred to Human Resources prior to any response.
8.0 RELATED DOCUMENTS
8.1 501, OCEA and SPMT memorandums of understanding (MOUs)
8.2 Human Resources Intern Program guidelines
8.3 Policy F50.00, Problem Solving Procedure
8.4 Policy F60.00, Grievance Procedure
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\02044tem 14(o.HR Poficies.doc Revised: V1812004
Page 12
Orange County Policy Number: C10.10
Sanitation District Effective Date: AEI-25, 2001
February 25,`2004
Subject: CLASSIFICATION AND Supersedes: .
COMPENSATION
Apnl 25 2001`
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish and maintain uniform guidelines and procedures
for use in the administration of the Orange County;Sanitation District's (OCSD's)
classification and compensation programs.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 All Distfist OCSD employees,as specified herein.
3.0 DEFINITIONS
Classifications are groups of positions, regardless of location, which are alike enough in duties
and responsibilities to be called by the same descriptive title, to be given the same pay scale
under similar conditions, and to require substantially the same qualifications.
Salary Ranges are the range of pay rates, from minimum to maximum, set for a pay grade or
class.
Salary Grade is an organizational unit into which classifications of the same or similar value are
grouped for compensation purposes. All classifications in a grade have the same salary range.
Comparative Market are those agencies that Executive Management considers most
comparable to thA District OCSD in terms of function, population served, employee population,
technology and equipment.
Budgeted Positions are those positions that have been formally approved during the annual
budget process.
and leRgthef time WGFked dUFiRgthepeFfe-.rm...aa.n.r-,e- re-view peried when tiFneWgFked Is less than
the review perind
Y-Rating is the process of freezing the salary of an employee who has been reclassified to a
lower paid classification until the salary range exceeds the employee's salary.
4.0 POLICY
4.1 It is the policy of the DistroC.t OCSD to apply uniform classification and compensation
standards. The DistFict OCSD's Classification and Compensation Program provides for
the establishment of a wage and benefit structure through the Meet and Confer process
that allows Distfist OCSD management and DlStF;Gt OCSD employees to effectively
compete in the labor market and to retain present employees through an internally
H:\dep1\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204UEem 14(f).HR Policies.doc Revised: 2/10/2004
Page 13
consistent measure of relative job worth and personal merit. Every position is assigned
to a salary grade based upon the duties and responsibilities of that position and the
comparative market value of that job function. Comparisons are most generally made
with organizations of similar size and engaged in similar occupational pursuits within the
geographic area of potential recruitment. The salary ranges are set forth on Exhibit A.
4.2 The General Manager is authorized to employ and assign persons as needed to occupy
budgeted positions and to exercise supervision over all persons in accordance with the
provisions of this policy and to terminate, for cause,the employment of any regular full
time employee employed under these provisions. All other employees, e.g.,
probationary, part-time, and limited term/temporary and contract may be terminated at
t#ae Bis#iss OCSD's sole discretion.
4.3 The General Manager is also authorized to employ Executive Management employees
on an "at-will" basis. Conditions of"at-will"employment are set forth in District OCSp
Policy No. C180.00.
4.4 Non-management employees are awarded merit increases based upon their
performance as determined by the performance evaluation program. The specific
evaluation process and tools used to determine the actual amount of merit increase are
set forth in various Memoranda of Understanding (Supervisory, Professional, OCEA, 501
bargaining units) or other written procedures (Confidential bargaining unit). In addition,
(GOLA) to keep empleyeers' 6a!arie6 at market . the salary structure will be reviewed on
an annual basis and active employees will have their pay rates adjusted according to the
salary structure percentage adjustment.
4.5 Employees who believe their position is not properly classified may request a
classification study of their position through their direct supervisor. In addition, the
Distrint QCSD may conduct a classification study on its own initiative.
4.5.1 Classification studies can be requested by employees twice during the year,
during the annual budget planning process and in November. Those
reclassifications approved in the budget may be made effective any time during
the new fiscal year. Classification study requests must be submitted to Human
Resources no later than Nevembef October 151 for the November cycle.
4.5.2 Classification studies may be conducted by the District OC$D to establish and
determine job classifications as needed.
4.5.3 Classification studies may result in:
4.5.3.1 Employees being reclassified to either a lower or higher level
classification.
4.5.3.2 Employees being reclassified to a newly created classification.
4.5.3.3 Employees remaining in the current classification.
4.5.4 All classification study findings regarding existing classifications are subject to
approval by the General Manager;findings recommending the establishment of
new job classifications are subject to approval by the-Distract'-s OCSD's Board of
Directors.
4.6 The DistriGt shall PFGV*de aR invest.m.e.nt inrVentive salary to the employees within the
5.0 PROCEDURE
H:\doptlagenda\Board Agenda Reports\2004 Board Agenda Reports\0204\I1em 14(f).HR Policies.doc Revised: 2/18/2004
Page 14
5.1 New Employees. Employees shall be offered a salary at or near the minimum of the
range unless their level of training, educational background, expertise, and/or prior
earnings indicates a need for a salary greater than the minimum. The determination of an
appropriate salary should also consider the relationship of the employee's proposed
salary to that of other employees in the same classification and to employees supervised,
if applicable.
5.1.1 Exempt and non-exempt employees shall be compensated within the salary
range authorized for the classification in which they are employed and, in the
case of non-exempt employees, in accordance with FLSA provisions.
5.2 Probation. Employees serve a Probationary Period of six months and receive a
comprehensive performance evaluation at the end of that period.
5.—2.1 Employees hired before july 1 aF9 eligible fQF a PFGFated salary aGljustmen
.:
Employees hired At the range minim dii-(step 1)will receive a step
increase.upon,successfully completing their stx.mon#hs prabatianary.ped
aeqwstm9Rt Will be the pFebati9R GGFAple:tiGR date.
5.2.3
July.
5.3 Reviews. An annual performance review is completed for all employees in accordance
with the provisions of the performance evaluation program which is in force at the time.
5.3.1
first pay peried in jully. Employees in the'501 and OCEA bargaining units who
were-hired either on or before November 29,,2002 are eligible for a step increase
on the first day of the first pay period in July. Employees hired after November
29,:2002 are eligible for a step increase according to the schedule in the
applicable MOU.
Employees in'the bargaining
units of SPMT who were hired either on orbefore July 12,2002 are eligible for a
step increase on the first day of the first pay period in July. Employees hired
after July 12,2002 are eligible for step increase according to the schedule in
the applicable MOU.
5.3.3
prorated salary aeqU6itment based oR the aGtual numbei:of days worked during
than six mORths dUFiRg the review GyGle well Rot be eligible feF aRY peFferMaRGe
5.4 Promotional Increases. Employees who earn promotions to a higher pay range will
normally receive an increase of at least 5.5 perseRt one'step or a salary increase to the
bottom of the new pay range.
H:\deptlagenda\Board Agenda Reports\2004 Board Agenda Reports\020411tem 14(f).HR Poficies.doc Revised: 2/1=W4
Page 15
5.4.1 Employees are not entitled to a probationary salary adjustment at the conclusion `
of the Promotional Probationary Period If the employee's probation period has
not concluded as ofy-1 fFs effctEve date of their step''increase, the annual
performance based salary adjustment is deferred until such time as probation is
successfully concluded.
5.5 Y-Rating.
5.5.1 If the duties and responsibilities of a position are allocated to a lower paid
classification as a result of a classification study, the salary of the employee in
that position shall remain unchanged (Y-rated) according to the following table:
Years of Service Term of Y-rate
0-3 years One year
4-5 years Two years
6-10 years Three years
11 -20 years Four years
20 or more years Five years
5.5.2 The Y-rate remains in effect until the salary range for the new classification
equals or exceeds the employee's Y-rated salary, or until the term of the Y-rate
expires.
5.5.2.1 If the Y-rate expires before the employee's salary falls within the
range of the new classification, the employee shall be placed at the
maximum of the new range nearest but not more than the Y-rated
salary.
5.5.2.2 Employees become eligible for merit increases and G9LA salary
structure range,adjustment increases when the Y-rate is no longer in
effect.
5.5.2.3 An employee who requests a voluntary reduction is not entitled to a
Y-rate.
5.6 Z-Rating:
5.6.1 Employees allocated to classifications with a lower range maximum than their
current salary as a result of OCSD's Classification Study results implemented
effective July 12,2002 will have their salary remain unchanged until such time
thatthe range maximum of their salary range exceeds or equals their current
salary.
6.0 EXCEPTIONS
6.1 Sections 5.1, 5.2, 5.3, 5.4, 5.5 and 5.6 do not apply to at-will Executive Management
Employees.
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
8.1 Exhibit A
8.2 Fair Labor Standards Act
8.3 Former Policy C10.00 and C20.00.
8.4 At-will Policy C180.00.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204Utem 14(f).HR Policies.doc Revised: 2/18/2004
Page 16
Orange County Policy Number: C20.10
Sanitation District Effective Date: 1999
july 1,
` Its `2004
Subject: Equity Adjustments Supersedes: N/A
July 1, 19g9
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for use in the
distribution and administration of equity adjustments.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 All full-time regular employees.
3.0 DEFINITIONS
3.1 Inequity—Unusual salary disparity either between an employee and the market or
between two or more employees.
3.2 Peers— Employees in the same or comparable classifications performing similar or
comparable job duties and responsibilities. The classifications have the same or
comparable requirements for education, experience, knowledge, skills and abilities.
3.3 Competencies—The education, experience, responsibilities, knowledge, skills and
abilities an employee possesses. The acquisition of new or different competencies that
support the operational unit tend to broaden the scope of the job.
3.4 Market—Ter►Thirteen comparable California util agencres.
3.5 Market Rate—The average salary at the 7e percentile being paid in the market for a
given job.
rateG. The Orange County Sanitation,District(OCSD)contracts with an independent
consulting firm to'conduct a,market'survey every year.
4.0 POLICY
4.1 It is Orange County Sanitation District(OCSD) policy to correct pay inequities, in
accordance with this policy, that can not be remedied with the annual merit review
program.
4.2 All Pis#r Gt OCSD employees may be eligible for equity adjustments.
5.0 EQUITY ADJUSTMENT CATEGORIES
5.1 External Equity Adjustment—An equity adjustment may be made to an employee's salary so that
the salary corresponds to rates prevailing in the external market for an employee's job. This
adjustment may be made to bring an employee's salary closer to the market rate for his or her
position.
5.2 Internal Equity Adjustment—An adjustment may be made to an employee's salary so that
the salary corresponds to the job's relative value to the organization.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204Vtem 14(f).HR Policies.doc Revised: 2/1W004
Page 17
5.2.1 Relationship to Subordinates—An equity adjustment may be made to correct an
inequity that exists between a supervisor and his or her subordinate(s).
5.2.2 Relationship to Peers—An equity adjustment may be made to correct an inequity
that exists between an employee and his or her peer(s). The adjustment would be
required to create or reduce differential between employees with significant differences in
contribution levels.
5.2.3 Individual Equity Adjustment—An adjustment may be made to an employee's
salary so that the salary corresponds to the employee's competency level. The
adjustment may be made when an employee's level of contribution increases significantly
as the result of an increase in responsibilities.
6.0 PROCEDURES
6.1 Equity adjustment requests are submitted as Decision Packages during the normal
budget process each year.
6.2 Each Decision Package must include justification for the equity adjustment request.
Justification should include the employee's name; the Equity Adjustment Category; the
employee(s) with whom the inequity exists, if applicable;the amount of equity adjustment
required to correct the inequity; and, any other supporting information.
6.3 In unusual circumstances, a request may be considered outside of the budget process.
Consideration is initiated by submitting a Justification Memo, outlining the information
listed in Section 6.2 of this policy, to Human Resources. Equity adjustments
recommended outside of the budget process will be considered once a year in
November. The equity adjustment, if approved, will be funded by the General Manager's
contingency fund.
6.4 Human Resources will review all equity adjustment requests to ensure compliance with
t#}e Bistt+st's QCSD's Salary Structure and Compensation Policy; to provide market or
peer comparative data; to provide data for comparison across departments; and, to
provide information and advice as requested.
6.5 If an equity adjustment has been approved, either through the budget process or outside
of the budget process, Human Resources will process the equity adjustment increase by
generating an Employee Status Change Form and obtaining the necessary signatures.
6.6 The General Manager will sign all Employee Status Change Forms.
6.7 Equity adjustment increases authorized in the budget process will be made effective at
the start of the first pay period of the new fiscal year. All other adjustments will be made
effective on the first day of the pay period in which the Employee Status Change Form is
submitted to Payroll.
6.8 There shall be no right to an equity adjustment. Such adjustments shall be made at the
sole discretion of the B+s#ist OCSD and shall not be subject to the grievance procedure
or to judicial review.
H:\dopt�agenda\Board Agenda Reports12004 Board Agenda Reports\0204Utem 14(f).HR Policies.doc Revised: 2/1&2004
Page 18
7.0 EXCEPTIONS
7.1 Employees on Performance Improvement Plans (PIP's)are not eligible for equity
adjustments.
8.0 PROVISIONS AND CONDITIONS
9.0 RELATED DOCUMENTS
HAdepMgenda\Board Agenda Reports12004 Board Agenda Reports\0204Utem 14(1).HFt Policies.doc Revised: 2/18/2004
Page 19
Orange County Policy Number: C40.00
Sanitation District Effective Date: OGtGber 77' 1 AA7
Fe�►rua�lr���5,���1i
Subject: EXTRAORDINARY SERVICES Supersedes: OC ®ber-22 1997
COMPENSATION FOR EXEMPT
EMPLOYEES IN THE PROFESSIONAL
AND SUPERVISOR GROUPS
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform policies regarding extraordinary services
compensation for exempt employees in the Professional and,Supervisor Groups.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies only to employees in the Professional and Supervisor Groups.
3.0 DEFINITIONS
Exempt employees are those employees who are not covered by the minimum wage and
overtime provisions of the Fair Labor Standards Act, as amended. Such employees are
considered exempt by virtue of their duties in conformance with the Act's definition of executive,
administrative and professional responsibilities.
4.0 POLICY
4.1 It is the policy of the 00%0 County.Sanitation District{OCSD) to compensate
employees in the Professional and;Supervisor Groups for extraordinary services in
accordance with the following procedures.
5.0 PROCEDURE
5.1 Employees in the Professional and Supervisor Groups are exempt from the overtime
provisions of the Fair Labor Standards Act. However, when services are required beyond
what is normally expected of a position in this these groups, employees will be eligible to
receive additional compensation for performance of such extraordinary service, upon
approval of their Department Head or designee, as set forth in this policy.
5.2 Employees in the Professional and Supervisor Groups will be eligible to receive
additional compensation at their regular rate of pay for performing extraordinary services
of at least eight hours in a pay period. Extraordinary service is required work such as:
work required by a major facilities failure; work necessary to protect public health and
safety caused by an emergency declared as such by the General Manager or designee;
or work which cannot be reasonably anticipated due to extraordinary circumstances.
5.3 Written authorization to receive compensation for all such extraordinary service must be
obtained in advance, except in the event such approval is precluded by the nature of the
emergency. The authorization must be signed by the Department Head or designee, and
set forth the work to be accomplished,the reason such work is required, the anticipated
hours and eligibility for additional compensation. Pay for extraordinary;service time`shall
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204VItem 14(f).HR Policies.doc Revised: 2/1 812 0 0 4
Page 20
not ocxurt acktiat�orlrrie oft3 hours,in a,pay.peri+a rachad. All
authorized extraordinary service time worked must be reported on an Emergency
Overtime Report as well as the employee's time report.
FA
of 550 shall be paid at the empleyeegs Fegular Fate of pay.
6.0 EXCEPTIONS
6.1 Except for performing extraordinary services as defined in this policy and in their
Memorandum of Understanding, Professional and Supervisor Groups employees are not
entitled to receive any compensation or compensatory time off for service rendered
beyond their normal work schedule.
7.0 PROVISIONS AND CONDITIONS
7.1 Unless an employee's contract indicates otherwise, the provisions of this policy shall
apply only to Professional and Supervisor Groups employees.
8.0 RELATED DOCUMENTS
8.1 Fair Labor Standards Act, as amended.
H:ldeptlagenda\Board Agenda Reports\2004 Board Agenda Reports1020411tem 14(f).HR Policies.doc Revised: 2/1 812 0 0 4
Page 21
Orange County Policy Number: C170.00
Sanitation District Effective Date: April 7Q 1999
�a a-�-rrcv�—r�r�.�
Feb �rary 25,!�e- 044
Subject: California Wastewater Supersedes: NIA
Treatment Plant Operator's Grade V AROM "
Certificate Pay
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 To establish uniform guidelines and procedures for California Wastewater Treatment Plant
Operator's Grade V Certificate pay.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all employees in the Operations Division who have obtained a
California Wastewater Treatment Plant Operator's Grade V Certificate and who perform
duties involving the operation and control of wastewater through the treatment plant.
3.0 DEFINITIONS
4.0 POLICY
4.1 It is the policy of the Orange County;Sanitation District(OCSD)to compensate employees in
the Operations Division who perform duties involving the operation and control of
wastewater through the treatment plant for the obtainment of a California Wastewater
Treatment Plant Operator's Grade V Certificate.
5.0 PROCEDURE
5.1 Employees who perform duties involving the operation and control of wastewater through the
treatment plant are eligible to receive a quarter of a 5.5% Gt9p inGFea6e, o a 1.375%
increase, upon obtainment of a California Wastewater Treatment Plant Operator's Grade V
Certificate.
5.2 Employees who fail to maintain their Grade V Certificate will lose the Grade V Certificate
pay.
6.0 EXCEPTIONS
6.1 Employees in classifications with a minimum qualification of California Wastewater
Treatment Plant Operator's Grade V Certificate are not entitled to the Grade V Certificate
pay.
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda RepoRs\0204\ftem 14(f).HR Policies.doc Revised: 2/18/2004
Page 22
Orange County Policy Number: C190.00
2003
Sanitation District Effective Date: ,
February 25,2004
Subject: Variable Non Base Pay Supersedes: CebFuaFy 26, 2003
October 29,2 3
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for variable
pay other than basic hourly rate. This variable pay includes: overtime pay for non-
exempt employees, acting pay, call-back pay, standby pay, providing unscheduled
overtime meals, severance pay and differential shift pay.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 Overtime Day for non-exempt applies to all OrangetCanty Sanitation District(OCSD)
employees represented by the Engineering Unit, Technical Services Unit,
Administrative/Clerical Unit, Operations and Maintenance and nonexempt confidential
positions.
2.2 Acting pay, unscheduled overtime meals and severance pay applies to all Distfiet OCSD
employees regardless of their organizational unit.
2.3 Call-back pay and standby pay applies to all non-exempt District OCSD employees
regardless of their organizational unit.
2.4 Shift differential pay applies to all Distfiet OCSD employees who are covered by an MOU
that entitles them to shift differential pay.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(f).HR Policies.doc Revised: 2 IW004
Page 23
3.0 DEFINITIONS
3.1 Acting means performing substantially all of the duties of a vacant budgeted position with
a higher maximum rate of pay.
3.2 Call-back paV is paid to an employee by tie-gist OCSD when an employee is called
back to work by management without prior notice, and the employee has completed his
or her normal work shift and left the plant, or when prior notice is given but the work
begins on the same day at least three hours after completion of the regular shift, the
employee shall receive a minimum of three hours of call-back pay.
3.3 Non-Exempt employees who are covered by the minimum wage and overtime provisions
of the Fair Labor Standards Act, as amended. Such employees, because of the type of
work that they perform and their earnings level, are subject to receiving overtime pay in
addition to any entitlement otherwise provided for in applicable Memoranda of
Understanding or other policies.
3.4 Overtime is the number of hours in paid status in excess of 40 during a workweek.
3.5 Salary Range is the approved salary minimum and approved salary maximum for each
pay grade in the-Distrast's OCSD's approved compensation structure.
3.6 Standby is time during which an employee is not required to be at the work location or at
the employee's residence but is required to be available for immediate return to work.
3.7 Workweek
N-It 9-Ads aAy time a#eF midnight eR Friday, all he,mr, wnrkAd oR that shift aFe GORsideFed
Fked an . For full-time employees is 40 houtsl ,er 18> hout�period, to be
Paid on a biweelc3y payroll basis of 80 hours worked. Employee work periods may be
scheduled in shfhks f four 9-hour days,and one 4-hour day each workweek(9/80
schedule),five 8-ftour days each workweek (10/80),four i 0-hour days each workweek
(8/80);or three 12 hour days=and one 4-hour day each workweek (7/80). The starting
and'ending times`of individual employees'workweeks may vary.
4.0 POLICY
4.1 OVERTIME PAY FOR NON-EXEMPT EMPLOYEES
4.1.1 Non-exempt employees who qualify for overtime compensation for work beyond
their normal schedule shall be paid one-and-a-half times their regular rate of pay
in accordance with the procedures listed in section 5.1.
4.2 ACTING PAY
4.2.1 It is DistFiGt OCS© policy to compensate employees, for performing substantially
all of the duties of a vacant budgeted position with a higher maximum rate of pay
in accordance with the procedures listed in section 5.2.
4.2.2 Acting pay status shall continue for a maximum of six months.
4.3 CALL-BACK PAY
4.3.1 It is Dis#ist OCSD policy to compensate employees for call-back pay in
accordance with the procedure listed in section 5.3.
4.4 STANDBY PAY
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0200tem 14(1).HR Policies.doc Revised: 2/18/2004
Page 24
4.4.1 An employee covered by a Memorandum of Understanding provision for standby
pay who is placed on standby shall be compensated at the rate of two hundred
dollars per week, and will also receive call-back pay when they are actually
called to work in accordance with the procedures listed in section 5.4.
4.5 UNSCHEDULED OVERTIME MEALS
4.5.1 It is Distract OCSD policy to provide employees with money for meals or food
service when they are required to serve unscheduled overtime in accordance
with the procedure listed in section 5.5.
4.6 SEVERANCE PAY
4.6.1 Employees are expected to give a minimum of two weeks written notification
when resigning from employment with the-Pistrist OGSU. The Bistrist OCSD will
follow the procedures for a Notice of Intent to Separate as listed in section 5.6.
4.7 SHIFT DIFFERENTIAL PAY
.................
4.7.1 It is Dis#ist OCSD policy to compensate employees for shift work outside normal
business hours at an hourly rate above their normal hourly rate in accordance
with the procedures listed in section 5.7.
5.0 PROCEDURE
5.1 OVERTIME PAY FOR NON-EXEMPT EMPLOYEES
5.1.1 When an employee's work schedule requires that they work on an observed
holiday, the employee may opt to be paid at two-and-one-half times their regular
rate of pay for the holiday or to be paid at one-and-one-half times their regular
rate and receive an amount of Holiday Compensatory Time Off equivalent to the
number of hours in the shift. Normally, employees that accumulate in excess of
fifty hours of Holiday Compensatory Time Off will be scheduled to take such
excess time off or be paid for the excess accumulated Holiday Compensatory
Time Off at the convenience of thiq 9istrirt OCSD. For good reason, the
Department Head may allow Holiday Compensatory Time Off to be accumulated
in excess of fifty hours.
5.2 ACTING PAY
5.2.1 Employees who are temporarily assigned by District OCSD+management to
perform substantially all of the duties of a higher level classification for a period of
at least 100 consecutive hours will be eligible for a salary increase,for further
continued service in the higher classification.
5.2.2 For service beyond 100 consecutive hours, pay shall be 5.5*%nigher one step
greater than the employee's current rate of pay, or at the minimum of the pay
range for the acting position, whichever is greater.
5.2.2.1 The higher rate of pay begins with the 10151 hour, and continues until the
assignment ends.
5.2.2.2 Requests for acting pay require the approval of the employee's
Department Head and the Director of Human Resources.
5.3 CALL-BACK PAY
5.3.1 When an employee is called back to work by the District OCSD without prior
notice, and the employee has completed his or her normal work shift for that day
and left the work site, or when prior notice is given by the District OCSD, but the
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\ltem 14(Q.HR Poficies.doc Revised: ?11=004
Page 25
work begins on the same day at least three hours after completion of an
employee's regular shift, the employee shall receive a minimum of three hours of
call-back pay. The three hours minimum, whether or not actually worked, shall
be paid at the rate of one and one half times the employee's regular hourly rate.
If the actual work time exceeds three hours, the employee will be compensated
for that time as well, except that no employee may work for or be compensated
for more than 16 hours in a 24-hour period. Employees who are called back a
second time within a normal shift period are considered to be working for the
duration of that shift.
5.4 STANDBY PAY
5.4.1 Standby assignments shall first be made on a voluntary basis.
5.4.2 A volunteer standby list shall be established by classification and job location.
5.4.3 Standby assignments shall be made from the list of employees who are
competent and experienced, in alphabetical order, on a rotating basis.
5.4.4 In the event that no one volunteers,the-Bistrist OCSD shall, on a rotational basis,
assign standby by job classification and work location from employees who are
competent and experienced.
5.5 UNSCHEDULED OVERTIME MEALS
5.5.1 When employees are required to work overtime due to an emergency, and actually work
at least five hours, or due to an unanticipated extension of their regular workday that
includes a regular meal period, the employee is entitled to reimbursement for the actual
cost of a meal, not to exceed applicable per diem amounts in addition to any
compensation for time worked. Receipts are not required to receive the per diem
amount. In lieu of cash reimbursement,tie Bistsst-0SD may provide actual food
service to the employees.
5.6 SEVERANCE PAY
5.6.1 When a full-time regular employee is separated from employment by action of
tl-ie-9istrist OCSQ, except for disciplinary cause,the employee will be notified in
writing through a Notice of Intent to Separate two weeks prior to the effective
separation date. The notification period for employees on unpaid leave will be
reduced by the number of calendar days of such leave. In the event such
notification is not given,the employee shall be entitled to severance pay in
accordance with the formula set forth below:
5.6.1.1 Full-time, employees shall be entitled to eight hours pay for each full
calendar month of continuous employment not to exceed one hundred
sixty hours pay, or as may be determined by the General Manager.
5.6.1.2 Employees in limited term or part-time classifications, and employees
who are dismissed for cause, are not eligible for severance pay under
any circumstances.
5.7 SHIFT DIFFERENTIAL PAY
5.7.1 Employees who are regularly assigned to work a night shift that consists of 50%
or more of their hours between 6 p.m. and 6 a.m., and who actually work that
shift, shall receive a shift differential of$2.50 per hour.
6.0 EXCEPTIONS
H:\dept\agenda\Board Agenda Reports12004 Board Agenda Reports\0204Utem 14(Q.HR Poiicies.doc Revised: 211 W004
Page 26
6.1 Acting pay-the 100-hour eligibility period may be waived at the discretion of the General
Manager.
7.0 PROVISIONS AND CONDITIONS
7.1 Standby pay—a standby list will be developed by the Operations and Maintenance
Department weekly, and it shall be posted at both the Plant No. 1 Control Center and at
the Plant No. 2 Operations Center.
7.2 Severance pay—employees who are dismissed for cause will not receive a Notice of
Intent to Separate under the provisions of the policy.
8.0 RELATED DOCUMENTS
8.1 Overtime pay non-exempt employees- Fair Labor Standards Act
H:\dept\agendMBoard Agenda Reporls\2004 Board Agenda Reports\0204\ltem 14(f).HR Policies.doc Revised: 2/18/2004
Page 27
Orange County Policy Number: D110.00
Sanitation District Effective Date: OGtobeF 22, 2003
February 25, 2004
Subject: Catastrophic Illness Leave Supersedes: October 22, 2003
Donation Program
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for use in the
administration of the District's Catastrophic Illness Leave Donation Program.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 All District employees.
3.0 DEFINITIONS
3.1 Catastrophic Illness or Injury
• Debilitating illness or injury which is expected to incapacitate the employee for an
extended period of time and which creates a financial hardship due to the exhaustion
of all accrued leave.
• A debilitating illness or injury of a child, parent or spouse that results in the employee
being required to take time away from work for an extended period to care for the
family member,therefore creating a hardship due to the exhaustion of the
employee's accrued leave.
4.0 POLICY
4.1 Employees may on occasion face catastrophic medical conditions involving themselves
or their immediate family that results in the exhaustion of all accrued sick, vacation,
personal or other paid leave. Such employees may request, or be nominated for
allocations of leave time according to the District's Catastrophic Illness Leave Donation
Program.
4.2 Employees may, in accordance with the provisions of the District's policy regarding the
Catastrophic Illness Leave Donation Program, elect to donate accrued and unused
personal leave, vacation leave or compensatory time off to an individual employee
qualified and approved to receive allocations of leave time.
4.3 Leave time eligible to be donated by one employee to another include vacation,
compensatory or personal leave.
5.0 PROCEDURE
5.1 Requests or nominations for donated leave time are subject to the approval of the
Director of Human Resources or designee, pursuant to this policy.
5.2 Requests for donated leave time are to be submitted to the Human Resources
Supervisor using the form"Application for Use of Catastrophic Illness Leave Hours". This
form is located on the HR intranet site.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(1).HR Policies.doc Revised: 2l1W004
Page 28
5.3 Communicating the request to District employees for leave time donations shall be made
in the following manner:
5.3.1 The employee or nominator will submit a draft e-mail to Human Resources for
review informing employees of the request for leave time donations.
5.3.2 Human Resources will send the approved e-mail announcement to the
employee's immediate work division, and may also send it to the department. It
can later be sent to other divisions or departments if requested.
5.4 To make a leave time donation, employees should complete a"Catastrophic Illness
Leave Donation Form"and submit it the form to Human Resources. This form is located
on the HR intranet site.
5.5 The vacation, compensatory or personal leave time donated by an employee shall be
converted to a dollar value based on the hourly rate of the donor.
5.6 At the time of allocation, those dollars shall then be converted into sick leave or personal
leave at the hourly rate of the recipient of the donated leave time.
6.0 EXCEPTIONS
6.1 Employees who have not exhausted their paid leave-vacation, sick, personal and
compensatory time off - at the time of request or nomination will not be considered for
allocation of leave time until their paid leave time is exhausted.
6.2 Sick leave may not be donated by one employee to another.
7.0 PROVISIONS AND CONDITIONS
7.1 To be eligible to receive allocations of leave time as provided by the Catastrophic Illness
Leave Donation Program, employees must have exhausted all of their paid leave,
including vacation, sick, personal and compensatory time off.
7.2 The maximum allocation of donated leave that an employee may receive is 480 hours per
individual per 12 month period except in the event the leave period terminates due to the
employee's death, if death occurs,remaining donated hours rnay.exceed 480 to be,paid
out-zs.asurvivor benefit.
7.3 Employees will be requested to provide medical documentation of a catastrophic health
condition involving their child, parent or spouse, or involving the employee's own
catastrophic health condition.
7.4 Donations must be made in whole hour increments, and are irrevocable.
7.4.1 Any such hours that remain at the conclusion of the leave period shall be
returned to the donors on a pro-rated basis per the hourly salary of the originally
donated hours.
7.4.2 In the case of an employee's death during'the leave period,donors may be`given
the option of having their donated hours,remain in the.deceased employee's
leave account to be paid out as a survivor benefit.
8.0 RELATED DOCUMENTS
8.1 Application for Use of Catastrophic Illness Leave Hours form.
8.2 Catastrophic Illness Leave Donation form
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204Utem 14(f).HR Policies.doc Revised: 2 IM004
Page 29
Orange County Policy Number: D30.00
.� Sanitation District Effective Date: OatobeF 24, 2002
February 25 2004
Subject: HOLIDAYS Supersedes: De^ember 20 2000
October 24 2002
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for holidays.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all current employees regardless of their organizational unit.
3.0 DEFINITIONS
4.0 POLICY
4.1 It is ti4e Orange;County Sanitation District's(OCSP's) policy to grant employees 12 paid
holidays per year in accordance with this policy.
5.0 PROCEDURE
5.1 Full-time employees shall receive holiday pay if their entire scheduled work shift
immediately preceding and following the holiday is in a paid payroll status. When an
employee's work schedule requires that they work on an observed holiday,the employee
shall be paid at the employee's regular rate of pay for the holiday or receive an equivalent
amount of holiday compensatory time off, and shall also receive overtime pay at the rate
of one-and-one-half times their regular hourly rate for all hours actually worked.
5.2 Holiday pay for part-time employees is based on a nine (9) hour workday. It is paid on
the following prorated basis:
NORMALLY SCHEDULED HOURS OF WORK PER WEEK PERCENT BENEFIT/SUBSIDY
0—under 19 None
20—under 29 50%- 4.5 hours
30—39 75% - 6.75 hours
5.3 When a holiday occurs on an employee's regularly scheduled day off, the
employee will accrue compensatory time off for those hours. In no case may an
employee accumulate more than 50 hours holiday compensatory time off.
5.4 The days listed below are observed by the 9+6trfst OCSD as holidays for 2003, 2004 and
2005.
5.5 Employees who are assigned to eight, nine or ten-hour shifts, Monday through Friday,
will observe the holidays listed in Schedule A. Employees who are assigned to twelve-
hour shifts will observe the holidays as listed in Schedule B.
SCHEDULE A
HOLIDAY F2003 2004 7_ 2005
H:\depttagendMBoard Agenda Reports12004 Board Agenda Reports\0204U1em 14(o.HR Poticies.doc Revised: 2JI&2004
Page 30
New Year's Day Wednesday,January 1 Thursday,January 1 Friday,December 31
Lincoln's Birthday Wednesday,February 12 Thursday,February 12 Friday,February 11
President's Day Monday,February 17 Monday,February 16 Monday,February 21
Memorial Day Monday,May 26 Monday,May 31 Monday,May 30
Independence Day Friday,July 4 Monday,July 5 Monday,July 4
Labor Day Monday,September 1 Monday,September 6 Monday,September 5
Veteran's Day Tuesday,November 11 Thursday,November 11 Friday,November 11
Thanksgiving Day Thursday,November 27 Thursday,November 25 Thursday,November 24
Day after Thanksgiving Friday,November 28 Friday,November 26 Friday,November 25
Day before Christmas Wednesday,December 24 Thursday,December 23 Friday,December 23
Christmas Day Thursday,December 25 Friday,December 24 Monday,December 26
Floating Holiday ** ** **
SCHEDULE B
HOLIDAY 2003 2004 2005
New Year's Day Wednesday,January 1 Thursday,January 1 Saturday,January 1
Lincoln's Birthday Wednesday,February 12 Thursday,February 12 Saturday,February 12
President's Day Monday,February 17 Monday,February 16 Monday,February 21
Memorial Day Monday,May 26 Monday,May 31 Monday,May 30
Independence Day Friday,July 4 Sunday,July 4 Monday,July 4
Labor Day Monday,September 1 Monday,September 6 Monday,September 5
Veteran's Day Tuesday,November 11 Thursday,November 11 Friday,November 11
Thanksgiving Day Thursday,November 27 Thursday,November 25 Thursday,November 24
Day after Thanksgiving Friday,November 28 Friday,November 23 Friday,November 25
Day before Christmas Wednesday,December 24 Friday,December 24 Saturday,December 24
Christmas Day Thursday,December 25 Saturday,December 25 Sunday,December 25
Floating Holiday ** ** **
** Employees may elect one day during each year as a"Floating Holiday." Near emplo�tees wdl
accrue th"e'. bating Ho liday"on the.foliowing pra=ir to basis thelr:ftrst calendar year�1 IServic :
s 1.t quarter hire=100%, 21 quarter hire=750% 3` quarter hire :50%,and. 'quarter hire 0%
The"Floating Holiday" must be used within the year it is accrued.
AR eFAP1Gy9e be eligible to aGGrue the Flgat;Rg Holiday if empleyed en or before nenernher I
sE
Every effort shall be made to grant an employee's request for a"Floating Holiday'off providing an
employee gives sufficient notice to their supervisor. It is recommended that the floating holiday be
utilized by the last full pay-period in December of the year in which it is accrued however, if an
employee chooses to use the floating holiday after the last full pay-period up until December 31,
they may. The employee should notify payroll if they choose the latter option.
6.0 EXCEPTIONS
6.1 When an employee is on medical or pregnancy leave, holidays will be paid only during
disability waiting period if employee is in a continuous paid status. All other holidays that
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\ltem 14i11.HR Policies.doe Revised: 2/18/2004
Page 31
occur outside the waiting period will not be paid, regardless if employee is in paid status
or not.
6.2 Part-time employees who work on a holiday are not eligible to receive overtime pay.
7.0 PROVISIONS AND CONDITIONS
7.1 If a regularly scheduled holiday occurs on a Saturday, the previous Friday shall be taken
off as the"holiday"for pay purposes. If a regularly scheduled holiday occurs on a
Sunday, then the following Monday shall be taken off as the"holiday'for pay purposes.
8.0 RELATED DOCUMENTS
H:\depl\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(f).HR Polides.doc Revised: 2/1812004
Page 32
Q
Orange County Policy Number: D50.00
Sanitation District Effective Date: OGtober 27, 1999
tleblruary5s2004
Subject: INSURANCE Supersedes: May 13,
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for use in the
administration of the Q#00e_Gount �SanWcir District's(OCSD's)insurance benefits
program.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 All Dis#ist OD employees.
3.0 DEFINITIONS
4.0 POLICY
4.1 T#e Distract ?aGSD shall provide medical-health insurance coverage through both health
maintenance organizations and an indemnity type group health plan, life insurance, and
disability insurance for the benefit of full-time employees.
4.2 All insurance coverage shall become effective on the first day of the month following eras
date of hire;regariliess,of tiire,date. An open enrollment period
shall be held annually in the month of June.
5.0 PLANS- PROGRAMS
5.1 Medical. The Dis#ist OCSQ shall contribute 100%of employee only premiums for the
medical health plans and shall contribute 80%of the employee +1 dependent and full
family premiums. Any change in insurance rates shall be shared equally in same ratio as
premiums are currently paid by the Dis# ist C CS0 and employees. Before the renewal of
any Distrast's OCSD's=sponsored health insurance plan,the parties agree to meet and
confer as to the plan.
5.1.1 Any change in insurance rates caused by a carrier after 11-25-96 are subject to
the applicable provisions of the various Memoranda of Understanding approved
by the Boards of Directors.
5.2 Life. The DistFiet OCSQ provides term life insurance coverage for most employees. The
DistKiet OCSD shall pay the full premium for term life insurance as established for each
employee covered under a Memorandum of Understanding or as otherwise agreed upon.
5.3 Short Term Disability. The District OC}shall provide a non-work related, short-term
disability indemnity plan that pays up to a maximum of$3W$490 per week for up to 26
weeks following a fourteen calendar day waiting period. Employees may request to
receive prorated sick leave, personal leave or vacation pay to supplement their short term
disability payments in an amount such that the sum of both is equal to the employee's
regular base pay.
5.4 Long-Term Disability. The-District OCSD offers, at the employee's expense, a non-work
related, long-term disability indemnity plan that pays two-thirds of the employee's rate of
pay in effect at the time of such disability, not to exceed$5,000 per month,following a
90-day waiting period of continuous disability. The DistAGOOCS0 provides this coverage
at tie District's OCSD's expense after five years of employment.
H:ldeptlagenda\Board Agenda Reports\2004 Board Agenda Reports\0204Utem 14(Q.HR Policies.doc Revised: 2 IM004
Page 33
5.5 Dental. The-Dis# v+st .,=SD provides a dental plan for regular, full-time employees and
their eligible dependents at no cost for employee-only coverage and$9.00 per month for
full family coverage.
5.5 Vision. The D44riAt OCSD shall provide a vision insurance plan for regular, full-time
employees and their eligible dependents.
5.6 Retiring Employees. The Distest OCSD:shall pay,for employees hired prior to July 1,
1988, two and one-half months' premium for each year of continuous service of a retiring
employee towards the premium costs of coverage for the employee and eligible
dependents under the-Mistrist's OG medical plan.
5.6.1 The District OCSD shall enter into an agreement with the Orange County
Employee Retirement System (OCERS) to implement the retiree medical health
premium offset program established by the County of Orange wherein the cost of
health premiums are offset by$10 per month for every year of service up to a
maximum of 25 years or$250 per month.
5 7 deceased Emplovees In the`sventa l eQtCefath�af an acute employee O s gf ay
' �I �jjUnl C�3St HOC aeilQt ,Of Ott@]t$�CCQB $iStB f��dtfH91
f<er�mrrae for me sutt3ng dependenis covered underthe plo�ies
a lld ii@[l ,llns6i c A' plans x 7 t µ s _•%.:.Via'
5.8 Workers Compensation Insurance. The Distrist''s t7CSD's Workers Compensation
program is self-funded and administered by a third party administrator. Workers'
Compensation insurance provides coverage for injuries arising out of employment with
the-District OCSID and occurring in the course of employment.
5.9 Reimbursement Account. Section 125 of the Internal Revenue Code permits employees
to use pretax dollars to pay for their portion of the cost of benefits under the plan through
salary redirection arrangements. The available options are summarized below. For
complete information regarding Flexible Spending Accounts employees must refer to the
plan booklet available in the Human Resources Department. Participation in this
Program does not affect the Distrist'n OCSG`s contribution to the Orange County
Employees Retirement System. The amount deducted shall then be repaid to the
employee through the Bistris s OCSD's provided Reimbursement Program.
5.9.1
5.9.2 Medical Care Reimbursement Account.The purpose of this account is to provide
a method through which an employee can accumulate pretax funds in a Medical
Care Reimbursement Account for the purposes of reimbursing the employee for
payment of health care costs not otherwise covered by the health and medical
insurance.
5.9.3 Dependent Care Assistance Account.The purpose of this account is to provide a
method through which an employee can accumulate pretax funds in a Dependent
Care Assistance Account for the purposes of reimbursing the employee for child
care expenses or day care for a disabled dependent.
6.0 EXCEPTIONS
6.1 Contract workers are not entitled to and are ineligible to join or participate in any benefit
plans offered to those individuals listed on OCSD's payroll as regular employees.
7.0 PROVISIONS AND CONDITIONS
7.1 No combination of disability or sick leave pay shall result in more than an employee's
regular rate of pay. Employees may not receive short-term and long-term disability
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\ltem 14(f).HR Policies.doc Revised: 2/18=04
Page 34
benefits at the same time. An employee who is otherwise not eligible for Bistriet
paid long-term disability may purchase such coverage at their own expense.
7.2 In the event the-Bis#rist ID!b adds additional optional insurance plans, the 9istrist's
QGS©'S share of the premium shall be the same as for existing plans as set forth above.
In the event the-Bistrist OCSD changes underwriters for existing insurance plans, the
District's OC8M share of the premium shall be the same as for existing insurance plans
as set forth above.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(f).HR Policies.dec Revised: 211 M004
Page 35
Orange County Policy Number: D110.00
Sanitation District Effective Date: , 2003
February 25, 2004
Subject: Catastrophic Illness Leave Supersedes: October 22, 2003
Donation Program
Approved by: Lisa L. Tomko
6.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for use in the
administration of the District's Catastrophic Illness Leave Donation Program.
7.0 ORGANIZATIONAL UNITS AFFECTED
7.1 All District employees.
8.0 DEFINITIONS
8.1 Catastrophic Illness or Injury
• Debilitating illness or injury which is expected to incapacitate the employee for an
extended period of time and which creates a financial hardship due to the exhaustion
of all accrued leave.
• A debilitating illness or injury of a child, parent or spouse that results in the employee
being required to take time away from work for an extended period to care for the
family member,therefore creating a hardship due to the exhaustion of the
employee's accrued leave.
9.0 POLICY
4.1 Employees may on occasion face catastrophic medical conditions involving themselves
or their immediate family that results in the exhaustion of all accrued sick, vacation,
personal or other paid leave. Such employees may request, or be nominated for
allocations of leave time according to the District's Catastrophic Illness Leave Donation
Program.
4.3 Employees may, in accordance with the provisions of the District's policy regarding the
Catastrophic Illness Leave Donation Program, elect to donate accrued and unused
personal leave, vacation leave or compensatory time off to an individual employee
qualified and approved to receive allocations of leave time.
4.4 Leave time eligible to be donated by one employee to another include vacation,
compensatory or personal leave.
10.0 PROCEDURE
10.1 Requests or nominations for donated leave time are subject to the approval of the
Director of Human Resources or designee, pursuant to this policy.
10.2 Requests for donated leave time are to be submitted to the Human Resources
Supervisor using the form "Application for Use of Catastrophic Illness Leave Hours". This
form is located on the HR intranet site.
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\1tem 14(f).HR Policies.doc Revised: 2JIM004
Page 36
10.3 Communicating the request to District employees for leave time donations shall be made
in the following manner:
10.3.1 The employee or nominator will submit a draft e-mail to Human Resources for
review informing employees of the request for leave time donations.
10.3.2 Human Resources will send the approved e-mail announcement to the
employee's immediate work division, and may also send it to the department. It
can later be sent to other divisions or departments if requested.
10.4 To make a leave time donation, employees should complete a"Catastrophic Illness
Leave Donation Form"and submit it the form to Human Resources. This form is located
on the HR intranet site.
10.5 The vacation, compensatory or personal leave time donated by an employee shall be
converted to a dollar value based on the hourly rate of the donor.
10.6 At the time of allocation, those dollars shall then be converted into sick leave or personal
leave at the hourly rate of the recipient of the donated leave time.
6.0 EXCEPTIONS
6.1 Employees who have not exhausted their paid leave-vacation, sick, personal and
compensatory time off- at the time of request or nomination will not be considered for
allocation of leave time until their paid leave time is exhausted.
6.3 Sick leave may not be donated by one employee to another.
7.0 PROVISIONS AND CONDITIONS
7.1 To be eligible to receive allocations of leave time as provided by the Catastrophic Illness
Leave Donation Program, employees must have exhausted all of their paid leave,
including vacation, sick, personal and compensatory time off.
7.2 The maximum allocation of donated leave that an employee may receive is 480 hours per
individual per 12 month period except inAh'e ever t'the leave period terminates due to the
employee's death. If death occurs, remaining donated hours may exceed 480 to be.;paid
out:as a survivor benefit.
7.3 Employees will be requested to provide medical documentation of a catastrophic health
condition involving their child, parent or spouse, or involving the employee's own
catastrophic health condition.
7.5 Donations must be made in whole hour increments, and are irrevocable.
7.5.1 Any such hours that remain at the conclusion of the leave period shall be
returned to the donors on a pro-rated basis per the hourly salary of the originally
donated hours.
7.5.2 In the case"-of an employee's death during"the leave period, donors may be giver
the option of having their donated hours remain:in the;deceased employee's
leave account to be paid out as a survivor benefit.
9.0 RELATED DOCUMENTS
9.1 Application for Use of Catastrophic Illness Leave Hours form.
9.2 Catastrophic Illness Leave Donation form
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\1tem 14(i).HR Policies.dw Revised: 2/182004
Page 37
1
Orange County Policy Number: F50.00
Sanitation District Effective Date: FebFUaFy 26, 2003
mk rum 25,"2004
n. tobeF
Subject: PROBLEM SOLVING PROCEDURE Supersedes: o�,�,->�,�-r
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for application of
the Orat3g8'00u6ty;sakitit District's(QCSD'S Problem Solving Procedure.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all Bis#_rist-OCSb employees in all organizational units and
departments, unless otherwise specified.
3.0 DEFINITIONS
4.0 POLICY
4.1 It is thA District's OCSU's policy to encourage and facilitate the resolution of employee
concerns in a responsive, timely and fair manner.
5.0 PROCEDURE
5.1 Employees may bring problems to the attention of District OCSD managers through the
Problem-Solving Procedure. This procedure may be used to attempt to resolve issues that
may not be subject to the Grievance Procedure(Policy F60.00).
5.2 Employees should discuss concerns regarding issues that are not grievable with their
supervisor as soon as possible. The supervisor will review the situation or decision, and
provide a written response within five business days from the date they were notified of the
problem.
5 33 If the problem is not resolved to the employee's satisfaction, the employee may file a written
statement concerning the problem with the Director of Human Resources within ten business
days of receipt of the supervisor's decision. Upon request by either party, a meeting may be
held to define issues and establish the remedies sought. F9r LaGal 501 employees, the We*
.................
5.4 The employee will be provided with a written response within ten business days after their
his/her statement is received.Time limits may be extended for cause upon mutual consent of
the parties. The decision of Human Resources is final.
6.0 EXCEPTIONS
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
8.1 Policy F60.00, Grievance Procedure
H:\dept\agenda\Board Agenda Reports\2004 Board Agenda Reports\020411tem 14(f).HR Policies.doc Revised: 2l1812004
Page 38
Orange County Policy Number: F60.00
b Sanitation District Effective Date: GistobeF 22,1997
Febru�iry 25 2004
Subject: GRIEVANCE PROCEDURE Supersedes: October' 22; 1997
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for use in
administration of the Orange,Couhty Sarjrtation District's tOCSIX Grievance Procedure.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all Distrit OCSD employees in all organizational units and departments
unless otherwise specified.
3.0 DEFINITIONS
A Grievance is any complaint that management has violated a specific written policy or provision of
a
Memorandum of Understanding (MOU).
4.0 POLICY
4.1 It is the policy of thei)is#FiGt OCSD to allow a grievance to be brought to the attention of the
D+strant OCSD by an individual employee or by a recognized employee organization.
5.0 PROCEDURE
5.1 Grievances brought by two or more employees, and concerning the same incident, issue, or
course of conduct, or multiple grievances brought by the same employee may, upon mutual
agreement of the District OCSD and an employee organization, be consolidated for the
purposes of this procedure. An employee shall have the right to be represented at all steps
of the Grievance Procedure by any other employee within the bargaining group or by the
representative of the recognized employee organization. Any reference to days in this article
implies business days.
5.2 Step 1. An employee who has a complaint shall attempt to resolve it with them his/her
immediate supervisor within five days of the occurrence of the event giving rise to the
complaint. The supervisor shall attempt to resolve the issues surrounding the complaint, and
respond to the employee within five days.
5.3 Step 2. If the grievance is not settled informally at Step 1, it may be presented in writing to
the employee's Department Head or designee. This request for formal review must be
presented on a form provided by the District OCSD:within five days of the conclusion of Step
1. A copy of each written communication on a grievancewi+ill'be filed with the Director of
Human Resources. The written grievance must:
5.3.1 Identify the specific management act to be reviewed;
5.3.2 Specify how the employee was adversely affected;
5.3.3 List the specific provisions of the MOU that were allegedly violated, and state how
they were violated;
5.3.4 Specify the remedy requested;
H:ldept\agenda\Board Agenda Reports12004 Board Agenda Reports\0204\ltem 14(f).HR Policies.doc Revised: 2/1W004
Page 39
5.3.5. Provide the date of attempts at informal resolution and the name of the supervisor or
individual involved.
The Department Head, or designee, shall respond in writing to the employee within 10 days
after the date the grievance is received.
5.4 Step 3. If a grievance is not settled under Step 1 or 2, it may be presented to the Director of
Human Resources for review and written response. The request for formal review must be
presented on a form provided by the-Distfist OCSO within ten days of the conclusion of Step
1 or 2, and must contain the information specified in Step 2. A pop' f=each written
comae unicetian qq grievance;w it I$ filed with the Director,of Human Resources: The
Director of Human Resources,or designee, shall respond in writing to the employee within 10
days after the date the grievance is received.
5.5 Step 4. If the grievance cannot be resolved under Step 3, it may be presented to the General
Manager within 10 days from the date the Step 3 finding was issued. The General Manager
or designee, shall respond in writing to the employee within 15 days after the date the
grievance is received.
5.5.1 Failure of a supervisor, Department Head or other management
representative to respond within the prescribed time limit shall provide a
basis for the employee to appeal to the next step. If a grievance is not
presented or appealed to the next level within the specified time limits, it
shall be considered settled on the basis of the preceding response. The
Director of Human Resources may be petitioned in writing to waive the
step or time requirements provided sufficient cause exists. Time limits
may also be extended at any step upon mutual agreement of the parties.
5.6 , it may be
6.0 EXCEPTIONS
6.1 A grievance may not be brought by the DistFist OCSD through this procedure.
7.0 PROVISIONS AND CONDITIONS
7.1 General Provisions. An employee shall be given reasonable time off, with advance approval
of his or her supervisor,to investigate and process a grievance. When an employee is
represented by a recognized employee organization, that organization may designate one
employee to investigate and process the grievance. The employee representative shall be
given reasonable time off, with the advance approval of his or her supervisor, to perform this
duty. Time off for investigating and processing a grievance shall be without loss of pay.
Absence from work will be approved only if it does not disrupt the District's O..CSD's
operations. If the time requested cannot be provided, another time will be arranged.
7.2 Discipline imposed under Policy No. F70.00 (Discipline) is not reviewable as a grievance
under this procedure.
8.0 RELATED DOCUMENTS
H:ldept\agenda\Board Agenda Reports12004 Board Agenda Reports10204Utem 14(f).HR Policies.doc Revised: 2/18/20W
Page 40
Orange County Policy Number: F70.00
Sanitation District Effective Date: grill 26,i
FebrA.uall� 5.,,�2004
Subject: DISCIPLINE Supersedes: �2�r
A'plri#�,2000
Approved by: Lisa L. Tomko
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for use in the
administration of fair and consistent discipline in instances where employees have exceeded
the limits of acceptable behavior or performance.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 All Orange County`Sanitatiori District(OCSD)employees.
3.0 DEFINITIONS
Discipline is the occurrence of any of the following actions taken for just cause with respect to any
employee:eFal verbal reprimand, seur►sel+ng-meme, written warningreprimand, suspension without
pay, reduction in pay, demotion to a classification with a lower maximum rate of pay, or dismissal.
Dismissal is the separation from 9istriat OCSD employment of a non-probationary employee
Initiated by4#e- is�ist B QG or pFegeF j100 cause. 'Termination" means dismissal, and the terms
are used interchangeably throughout this policy manual.
4.0 POLICY
4.1 The Dis#ist OGSID is committed to practicing supervisory and management practices and
procedures which support effective operations in the interest of thA Dis#iet OCSD and of
our employees. Such procedures include the administration of fair and consistent discipline
in instances where employees have exceeded the limits of acceptable behavior or
performance. Employment with the District OCSD is voluntarily entered into, and
employees have the right to resign at any time to pursue other interests. Similarly,the
DistFiet OCSD has the right to conclude an employment relationship for proper cause when
it is believed to be in thA Dfstr+st's OCSD's best interests.
4.2 The General Manager is authorized and directed to exercise supervision over all employees
and to impose discipline, for just cause, upon any person employed under the provisions of
this Policy for both general and serious violations.
4.3 The General Manager shall establish rules and guidelines pertaining to the procedures
governing such actions.
4.4 The General Manager is authorized to delegate his authority herein to the Department
Heads, Division Managers, Director of Human Resources and other management and
supervisory employees, as the General Manager deems appropriate. Notwithstanding the
foregoing,"at-will' Executive Management employees may be dismissed at any time,
without notice or just cause.
4.5 Notwithstanding the foregoing, Executive Management and contract employees who have
signed an agreement to serve at the pleasure of the Joint Boards or General Manager are
"at-will"and may be dismissed at any time, without notice or just cause.
H:ldept%genda\Board Agenda Reports12004 Board Agenda Reports10204Utem 14(f).HR Policies.doc Revised: 2 IM004
Page 41
5.0 PROCEDURE
5.1 Discipline may occurs when any of the following actions are taken for just cause with respect
to any employee: oral"veitial reprimand,seURseiiRg-Fneme, written waming reprimand,
suspension without pay, reduction in pay, demotion to a classification with a lower maximum
rate of pay, or dismissal. Dismissal is the termination from District 00SD employment, of a
non-probationary employee, initiated by the PistRst OCSD for proper just cause. Employees
exempt from overtime pursuant to the Fair Labor Standards Act, however,shall not be
subject to suspension without pay for less than one week except for major safety violations.
5-.2 A Notice of Intent to impose disciplinary action is not required when the disciplinary action
involves aR eral verbal reprimand; 'or written warning reprimand: or suspens OR without pay
5.3 A Notice of Intent to impose disciplinary action is required and will be given to an employee
whenever the disciplinary action involves suspension without pay in-F.m.e.re than five working
days;reduction in pay, demotion to a classification with a lower maximum rate of pay or
dismissal. The Notice of Intent shall be given to the affected employee either by delivery in
person or by Certified Mail sent to the employee's last know address. The Notice of Intent
shall indicate the date on which it was personally delivered or deposited in the mail, which
shall be the date of issuance.
5.3.1 The Notice of Intent shall contain the fallowing:; W a description of the disciplinary
action intended and the effective date of the action, (2)the reasons for the proposed
action;-,and(3)a copy of the charges and materials upon which the action is based:,
antl„(4) a statement of the employee's right to respond,
either oraaty verbally or in writing to the aatheRy person initially imposing the
discipline, or to an.0 CSIDi.mdriagement,representatnra w�th:author ty to"make an
ef#ectnre recomrr�er ciatton 1an'the pcopos !.a6don,the person to whom any response
must be directed, and the fact that such response must be received within ten
business days of the date of issuance of the notice. The Notice will also advise the
employee of their the right to representation.
5.4 Prior to the effective date of any proposed disciplinary action requiring a Notice of Intent, the
employee will be given an opportunity to respond either orally or in writing to a management
representative with authority to make an effective recommendation on a proposed action.
After review of an employee's response,the District OCSD will notify the employee in writing
of any action to be taken. Such action may not involve discipline more severe than that
described in the Notice of Intent; however, the-District O .,SD may reduce discipline without
....................
further notice.
5.5 Dismissal shall be proceeded by at least one written warning repnrand, except in those
situations in which the employee knows or reasonably should have known that the
performance or conduct was unsatisfactory. Such performance or conduct may involve, but
is not limited to: dishonesty, possession, use, sale or being under the influence or drugs or
alcohol, theft or misappropriation of District's OCSD's property or'funcls, falsification of
District's bQSD's records, fighting on the job, insubordination, acts endangering people or
property, or other serious misconduct. The-District OCSD may also substitute a documented
suspension, with-er without pay, in lieu of the written warning reprIyn4nd requirement herein.
5.6 If a Notice of Intent is upheld and the disciplinary action is imposed,the employee may
request a post-disciplinary hearing. The request must be submitted to the Director of Human
Resources or designee within ten business days after the date of issuance of the notice of
disciplinary action. Human Resources shall schedule a post-disciplinary hearing with the
General Manager or his designee. The General Manager, or his designee, may uphold the
disciplinary action, which has been taken or may reduce such discipline without the issuance
of further notice. The decision of the General Manager or his designee shall be final.
H:1dep11agenda\Board Agenda Reports\2004 Board Agenda Reports\0204\Item 14(1).HR Policies.doc Revised: 2/18/2004
Page 42
5.7 , iRGIuding the Fight to pest disGipliRaFy hearing, shall apply to the
d*6G*p!*Re and dirmis;r,;;l Af r=xgr--doug M nagerneRt employees, who have not signed an at-wig
5.8 The-Dis#ist OCSD may place an employee on administrative leave without prior notice in
order to review or investigate allegations of conduct which, in the D06#946 QQ'S view,
would warrant relieving the employee immediately from all work duties. If, upon conclusion of
the investigation, neither suspension without pay nor dismissal is determined by the Dis#fct
OCSD to be appropriate, the employee shall be paid for the leave. Although an
administrative leave may exceed fifteen business days, if a suspension without pay is
determined to be the appropriate discipline, a maximum of fifteen business days of the
administrative leave period may be applied to such suspension without pay.
6.0 EXCEPTIONS
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
8.1 Policy 13100.00 Employee Separation.
H:ldepl%genda\Board Agenda Reports12004 Board Agenda Reports10204Utem 14(f).HR Poficies.doc Revised: 01W2004
Page 43
t
FAH R COMMITTEE Meeting Date To Bd.of Dir.
02/11/04 02/25/04
AGENDA REPORT Item Number Item Number
FAHR04-09 14(g)
Orange County Sanitation District
FROM: Lisa Tomko, Director of Human Resources
ORIGINATOR: James Matte, Safety and Health Supervisor
SUBJECT: Safety Policy, Backflow Prevention Policy
GENERAL MANAGER'S RECOMMENDATION
Approve SAFETY-POL-115, Backflow Prevention Program as provided for in Resolution
No. OCSD 02-5 regarding the District's Backflow Prevention Program.
SUMMARY
The District is implementing a written policy to adopt requirements of the California
Department of Health Services Regulations, found in Titles 17 and 22 of the California
Code of Regulations, that requires performance of specific actions and practices when
safeguarding potable water systems. This is a new program combining elements found
in existing Engineering Specifications, Safety and Health and Operations and
Maintenance programs.
The document presented for your review and adoption represents the District's written
Backflow Prevention Policy, which conforms to the elements defined in the California
Department of Health Services, Titles 17 and 22 of the California Code of Regulations.
PROJECT/CONTRACT COST SUMMARY
Not Applicable
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL INFORMATION
The Policy is required under the California Department of Health Services Regulations ,
found in Titles 17 and 22 of the California Code of Regulations.
ALTERNATIVES
Not Applicable
CEQA FINDINGS
Not Applicable
ATTACHMENTS
Attachment 1- Backflow Prevention Policy (SAFETY-POL-115)
R:depMgenda\Board Agenda Repons\2004 Board Agenda ReportsWWVtern 14(g).SAFETY•POL-115.doc
Revised: 8,120/01 Page 2
•
f
a
c7
ORANGE COUNTY SANITATION DISTRICT
Safety and Health Division
DRAFT
SAFETY POL-115
Backf low Prevention
APPROVALS
Approved by: Date:
Director of Human Resources
Approved by: Date:
Manager, Human Resources
Approved by: Date:
Safety and Health Supervisor
PROCEDURE REVISION HISTORY
Rev. Date Approval
0
This document is controlled when viewed online. When downloaded and printed, this
document becomes UNCONTROLLED, and users should check the Safety and
Emergency Response public folder to ensure that they have the latest version.
Backflow Prevention SAFETY-POL-115
Contents
Purposeand Scope.......................................................................................................3
Prerequisites .................................................................................................................3
Precautions....................................................................................................................3
Definitions......................................................................................................................3
General...........................................................................................................................5
Instructions-New Construction....................................................................................5
Training and Communication.......................................................................................5
Recordkeeping..............................................................................................................6
References.....................................................................................................................6
Attachments ..................................................................................................................7
Rev. 0 Hard Copy Is Uncontrolled
10/25/03 2 of 7
h:ldept\agendalboard agenda reports\2004 board agenda reports\0204utem 14(g).i.doc
Orange County Sanitation District Number: SAFETY-POL-115
Revision Number: 0
Backflow Prevention Program Date:
Approved by:
Purpose and Scope
This policy has been developed to protect the Orange County Sanitation District
(OCSD) water distribution system from contamination and/or pollution resulting from the
backflow, back-siphonage or cross connection into a potable water service
connection(s). The OCSD shall develop and implement a backflow prevention and
cross connection program that complies with state and local regulations. This policy
applies to all designs, installations, maintenance or testing function related to an OCSD
water distribution system. This policy shall also act as the mechanism for compliance
with existing OCSD specifications, policies and procedures while protecting employee
and public health.
Prerequisites
1. Connection to a potable water source.
2. Verify that this policy is the current version.
Precautions
1. Cross connections to potable water supplies can lead to contaminated water
supplies.
Definitions
Air Gap Separation (AG) A physical break between the supply line and a
receiving vessel.
Regulated Water Supply A water supply whose potability is regulated by a State
or local health agency
Auxiliary Water Supply Any water supply other than that received from an
OCSD water system.
AWWA Standard An official standard developed and approved by the
American Water Works Association.
Backflow A flow condition, caused by a differential in pressure
Rev. Hard Copy Is Uncontrolled
12/30/01 3 of 7
h:\dept\agenda\board agenda reports\2004 board agenda reports\0204\item 14(g).1.doc
Backflow Prevention SAFETY-POL-115
v
that causes the flow of unapproved water or other
contaminants into the potable supply source.
Backsiphonage Backflow caused by negative or reduced pressure in
the supply piping.
Backpressure Backflow caused by positive or higher pressure in the
user's system.
Cross Connection An unprotected actual or potential connection between
a potable water system used to supply water for
drinking purposes and any source or system containing
unapproved water or a substance that is not or cannot
be approved as safe, wholesome and potable. By-pass
arrangements, jumper connections, removable
sections, swivel or changeover devices or other
devices through which backflow could occur, shall be
considered cross-connections.
Double Check Valve An assembly of at least two independently acting check
valves including tightly closing shut-off valves on each
side of the check valve assembly and test cocks
available for testing the water tightness of each check
valve.
Recycled Water A wastewater which as a result of treatment is suitable
for uses other than potable use.
Reduced Pressure Principle A backflow preventer incorporating not less than two
check valves, an automatically operated differential
relief valve located between the two check valves, a
tightly closing shut-off on each side of the check valve
assembly, and is equipped with the necessary test
cocks for testing.
User Connection The point of connection of a user's piping to the water
supplier's facilities.
Water Supplier The person or entity who owns or operates a public
water system.
Water User Any person or entity obtaining water from a public
water supply.
Rev. 0 Hard Copy Is Uncontrolled
10/25/03 4 of 7
h:\dept\agenda\board agenda reports\2004 board agenda reports\020Atern 14(g).i.doc
Backflow Prevention SAFETY-POL-115
General
The OCSD shall install, operate, maintain and protect its water systems by controlling
actual or potential cross-connections via:
1. Promoting elimination of existing or future cross-connections through scheduled
inspections and regulation of water system construction and operation within
OCSD facilities.
2. Properly installing and maintaining backflow preventers where actual or potential
cross-connections exist to prevent backflow or back siphonage of contaminants
or pollutants into OCSD water systems.
3. All installations shall comply with regulatory requirements and shall be
commensurate with the degree of hazard that exists.
Instructions-New Construction
1. Backflow prevention shall be installed in accordance with OCSD Specification,
Sections 15100 and 15115.
2. The specifications shall include, but not be limited to, the following elements:
A. Submittal of the job-specific backflow prevention devices.
B. Submittal of the backflow preventer testing documentation.
C. Identification of locations where the contractor's work will require use of a
backflow preventer (specify type).
3. The Construction Inspector is responsible to ensure that backflow prevention
devices are tested by an independent third party and copies of the test results are
forwarded to the CMMS Group for inclusion into that system.
Training and Communication
1. A training program to educate applicable OCSD staff on:
A. The requirements of this policy;
B. The operating procedures by which the program is implemented; and,
C. Job-specific role(s)/responsibility(ies).
Rev. 0 Hard Copy Is Uncontrolled
10/25/03 5 of 7
h:\dept\agenda\board agenda reports\2004 board agenda reports\0204\Rem 14(g).i.doc
i
Backflow Prevention SAFETY-POL-115
r
Recordkeeping
1. A database within the Computer Maintenance Management System (CMMS) to
properly inventory and maintain existing backflow preventers.
2. The database shall include "at will" backflow preventers, used on an as needed
basis, and those currently in service on OCSD property.
3. This database should include, but not be limited to, the following elements:
A. The name of the device
B. Manufacturer
C. Serial Number (manufacturer)
D. Loop Tag Number (OCSD)
E. Location (if in service)
F. Date of purchase
G. Date of manufacture
H. Most recent certification test data
I. Date of the next scheduled or required certification test
4. A list of approved backflow prevention assemblies which will be made available to
OCSD employees and the public by written or electronic request.
References
OCSD Engineering Specifications, Sections 15100 and 15115
OCSD Engineering Guidelines, Chapters 2 and 6
OCSD Instrument and Equipment Tagging Procedure
California Code of Regulations, Title 17, Chapter 5
California Code of Regulations, Title 22, Division 4
American Water Works Association, Standard C506
Water Recycling 2030: Recommendations of California's Recycled Water Task Force,
California Department of Water Resources, June 2003
Rev. 0 Hard Copy Is Uncontrolled
10/25/03 6 of 7
h:\dept\agenda\board agenda reports\2004 board agenda reports\0204\itern 14(g).i.doc
Backflow Prevention SAFETY-POL-115
Approved Backflow Prevention Assemblies for Service Isolation, California Department
of Health Services, August 2002
Attachments
California Health Laws Related to Recycled Water, "The Purple Book". Most Recent
Edition. California Department of Health Services, Recycled Water Unit.
Rev. 0 Hard Copy Is Uncontrolled
10/25/03 7 of 7
h:\dept\agenda\board agenda reports\2004 board agenda reports\0200tem 14(g).1.doc
FAHR COMMITTEE Meeting Date To Bd.of Dir.
12/10/03 2/25/04
AGENDA REPORT Item Number Item Number
FAHR03-108 14 h
Orange County Sanitation District
FROM: Carol Beekman, Communications Services Manager
Originator: Dionne Kardos, Public Information Specialist
SUBJECT: CORPORATE IDENTITY AND PUBLIC AWARENESS PROJECT
GENERAL MANAGER'S RECOMMENDATION
FAHR Committee Recommendation:
Authorize the General Manager to solicit Requests for Proposals to conduct research
services in connection with the Corporate Identity and Public Awareness Project,
Specification No. CS-2003-16213D, in an amount not to exceed $50,000.
General Manager's Recommendation to FAHR:
Authorize the General Manager to solicit Requests for Proposal and subsequently
award a Consultant Services Agreement for Corporate Identity and Public Awareness
Project, Specification No. CS-2003-16213D, in the amount not to exceed $325,000.
SUMMARY
Staff discussed the five project components (see attachment). The FAHR Committee
recommended conducting only the initial baseline research component and that the
results from this research are presented for consideration at a future FAHR meeting.
Staff estimates the research and report to be completed in approximately six months.
The FAHR Committee had no recommendation as to the project's entire scope or
budget, presently estimated to be $325,000. The FAHR will address this question only
after the baseline research results are received.
PRIOR COMMITTEE/BOARD ACTIONS
None. This project was highlighted in the OCSD Communications Services Strategic
Plan for Fiscal Year 2003-04, that was received and filed at the October 8, 2003
FAHR Committee Meeting and at the October 22, 2003 Board Meeting.
PROJECT/CONTRACT COST SUMMARY
S50,000 is estimated for the initial baseline research component in Phase 1 . The total
estimated costs for Phase 1 is S125,000, budgeted in the current fiscal year's budget
(Contractual Services category in the Communication Services Division). Expenditures
during FY 2004-05 for Phase 2 work are estimated to be S200,000.
BUDGETIMPACT
® This item has been budgeted. (PHASE 1 research component only: in Section 6,on page 12)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
H:\depl\agenda\Board Agenda Reports\2004 Board Agenda Reports\0204Utern 14(h).Corporate Identity.doc
Revised: 0&04103 Page 1
ADDITIONAL INFORMATION
The project's scope includes: seeking a qualified firm or consultant team to conduct
customer awareness and perception surveys to gather baseline research information:
reviewing and making recommendations to OCSD's current Corporate Identity
System; and developing an implement plan for an educational marketing campaign
to promote a positive agency image to the general public and target audiences in
OCSD's service area.
The first step to gather baseline information on customer, employee and stakeholder
awareness and perception of OCSD is necessary to make recommendations
regarding OCSD's current Corporate Identity System. OCSD has not conducted
comprehensive, benchmark research on a large area of its service area and target
audiences to find out the answers to these most basic questions, "does the public
know who OCSD is" and "what OCSD does."
Part of the assessment of the OCSD's Corporate Identity System will be to determine
if the political will of stakeholders would embrace a name/identity change and if the
agency is equipped—financially and from a human resources standpoint—to undergo
a name/identity change that will need to be implemented throughout the entire agency.
The goal of this project is to establish a corporate identity system that clearly
communicates the Orange County Sanitation District's functions and vision. Project
objectives include:
Increase public awareness of who we are and what we do
Have the public perceive us as the essential service we are
Position ourselves within the community
Reinforce our positive messages
• Determine the needs and expectations of the community
Increase stakeholder involvement
This project is broken into two phases. Phase 1 includes the initial research work and
assessment of OCSD's current corporate identity system. Phase 2 work deliverables
are dependent on outcomes of Phase 1 , pending approval to proceed if a change to
OCSD's name or identity is recommended.
See attached Statement of Work for detailed project information.
ALTERNATIVES
No alternatives are proposed
CEQA FINDINGS
N/A
ATTACHMENT
1 . Estimated Costs Based on Request for Information Proposals
2. DRAFT Scope of Work for the Corporate Identity and Public Awareness Project
CB:dk
H:ldept4agenda\Board Agenda Reports\2004 Board Agenda Reports102Mtem 14(h).Corporate Identity.doc
Revised: 06iO4l03 Page 2
1
t
ATTACHMENT
December 10, 2003
ACTION ITEM: FAHR03-108
OCSD Corporate Identity and Public Awareness Project,
Estimated Costs Based on Request for Information Proposals
Project Components Estimated Cost
1. Initial Baseline Research $50,000
• 4 focus groups
• 500 telephone surveys
• one-on-one employee and board member interviews
2. Develop Corporate Identity Manual(includes review of current corporate identity system) $25,000
3. New Name/Logo/Identity Development $60,000
• Presentation and approval process with executive staff and board members
• Name/logo trademark search
• Final artwork
4. Public Awareness/Marketing Campaign(for new or existing identity) $140,000
• Internal—training for staff,workshop/event,Board/stakeholder event
• External—letters/mailing to service area and stakeholders,
public service announcements,media plan and event,
launch ads/advertising,news/web site articles,displays
5. Final Validation Research $50,000
4 focus groups
• 500 telephone surveys
• one-on-one employee and board member interviews
Total Estimated Project Budget NTE $325,000
NOTES:
• $125,000 has been budgeted for this work in the current Fiscal Year 2003-04 budget.The remaining
$200,000 will be a line item in the Fiscal Year 2004-05 budget.
• Administrative costs,including reports/proposals,meetings and presentations are included in the estimated
costs for each component above.Costs for creating new collateral material are not included in this project's
budget.
• A detailed breakdown of project tasks and deliverables are included in the Statement of Work on pages 51-55
of the agenda package.
H:\dept\agenda\Board Agenda Reportst2004 Board Agenda Reports102041 tern 14(h).Corporate Identity.doc
DRAFT 12/01/03
REQUEST FOR PROPOSALS (RFP)
Corporate Identityand
Public Awareness Proj* ect
•{ S a N 1 Tgr�oy
Q A
o �
v�vVv �
FIOU E EN�`���
Orange County Sanitation District
P.O. Box 8127
Fountain Valley, CA 92728-8127
(714) 962-2411
www.ocsd.com
RFP
ATTACHMENT A
Statement of Work
Statement of Work
Corporate Identity and Public Awareness Project
Table of Contents
1.0 Summary.......................................................................................................................................2
2.0 Background of the Orange County Sanitation District.................................................................2
3.0 Current Organizational Structure..................................................................................................2
4.0 Problem Statements......................................................................................................................3
5.0 Goal and Objectives of Project.....................................................................................................3
6.0 Project Timeframe........................................................................................................................3
7.0 Phase 1 Qualitative and Quantitative Research and Assessment.................................................3
ConductResearch Studies........................................................................................................3
Establish Customer and Stakeholder Baseline Information.....................................................4
Establish Strategic Positioning ................................................................................................4
Review of OCSD's Current Corporate Identity System..........................................................4
Assessment—No Name/Identity Change ................................................................................4
Assessment—Name/Identity Change is Recommended..........................................................4
8.o Phase 2 Rollout.............................................................................................................................4
Rollout—No Name/Identity Change.......................................................................................4
Rollout—Name/Identity Change is Recommended.................................................................5
9.0 Deliverables..................................................................................................................................5
Reportsand Proposals..............................................................................................................5
Final Logo/Identity Artwork(if applicable) ............................................................................5
Corporate Identity Standards Manual......................................................................................5
10.o General Requirements ..................................................................................................................5
ProjectManagement ................................................................................................................5
Meetings and Presentations......................................................................................................5
ProgressReports......................................................................................................................6
BillingRequirements...............................................................................................................6
Additional Requirements and Information..............................................................................6
ProjectCalendar.......................................................................................................................6
Al of 6 DRAFT 12/01/03
OCSD/GM/COM l30/CB:dk
M:\Griphics\DOCS\Corp ID Project 2003\SOW_CorpIDstudy_1203_fmaldrafl.doc
RFP
ATTACHMENT A
Statement of Work
1.0 Summary
The Orange County Sanitation District(OCSD)is seeking a qualified firm or consultant team to conduct customer
awareness and perception surveys to gather baseline information,review and make recommendations to OCSD's
current Corporate Identity System,and implement an educational marketing campaign to promote a positive agency
image and identity to the general public and target audiences in OCSD's service area.
2.0 Background of the Orange County Sanitation District
The Orange County Sanitation District(OCSD)is a public agency responsible for regional wastewater collection,
treatment and disposal from homes,businesses and industry in Orange County,California. Established in 1954,OCSD
is the third largest wastewater treatment discharger west of the Mississippi River. OCSD owns and operates two
wastewater treatment facilities and a 650-mile long sewer collections system. OCSD provides services to approximately
2.3 million people in 21 cities and three special districts in the northern and central portions of Orange County by
treating 240 million gallons per day of wastewater.OCSD serves approximately 92 percent of the County's population
with a service area of approximately 471 square miles,or 59 percent of the County.
OCSD vision states,"to maintain world-class leadership in wastewater and water ,a„
resource management."The primary goals of the OCSD wastewater management -- -��
program are to protect Orange County's most valuable resources—the Santa Ana orarnge C.-
River Watershed and the Pacific Ocean.Each day,OCSD employees,working as OCSD� caruomia
environmental stewards,control air emissions,work to conserve and recycle Service,
natural resources and monitor the impacts of wastewater discharge on marine life. Area
In 1995,OCSD changed its logo identity to the current one used today.The logo J
includes the words"protecting the environment."In July 1, 1998 the districts
consolidated,and the agency's name was officially changed from the County
Sanitation Districts of Orange County to the Orange County Sanitation District.
For additional background information and current news,please reference our website at yti%tiv.ocsd.com and attached
OCSD Communications Services Strategic Plan. Fiscal Year 1003-04.
3.0 Current Organizational Structure
OCSD is governed by a 25-member Board of Directors that is comprised of representatives from 21 cities,
unincorporated areas of the County and three special districts,including mayors of cities,members of city councils,
directors of independent special districts,and one member from the Orange County Board of Supervisors.OCSD
employs approximately 550 employees in seven departments—General Management, Finance and Purchasing,Human
Resources,Technical Services,Engineering,Operations and Maintenance,and Information Technology.The
departments are broken down into 22 divisions that perform a variety of different functions.OCSD employees can be
generally categorized into four different groups as follows:
Approx.
Employee Group Number Examples of Job Titles
Management&Supervisory 80 Directors,Managers, Supervisors,Foremen
Professional ISO Engineers,Accountants,Buyers,Analysts,Scientists,Specialists
Operations&Maintenance 185 Operators, Mechanics,Electricians,Welders, Builders,Technicians
Support Personnel 105 Inspectors,Assistants, Secretaries,Aides,Clerks
Also On-site:
Consultants/Contractors—Engineers,Construction Workers,Program Managers
Outsourced Services—Security Guards,Groundskeepers,Janitors
A2 of 6 DRAFT 12/01/03
OCSD/GM/COM 130/CB:dk
M:\Graphics\DOCS\Corp ID Project 2003\SOW_C'orplDstudN,_1203_finaldraft.doe
RFP
ATTACHMENT A
Statement of Work ;
OCSD's administrative office is located at Reclamation Plant No. 1 at the intersection of the Santa Ana River and the
405 Freeway in Fountain Valley,and its Wastewater Treatment Plant No.2 is located off Brookhurst Street near Pacific
Coast Highway in Huntington Beach.
4.0 Problem Statements
OCSD has been in operation well over 50 years in the same location.But does the public we service know who the
Orange County Sanitation District is and what services we provide?Can the public recognize our logo?Does the public
think we offer trash pickup and that we are part of the County?How well has OCSD educated the public on how vital
our sewers and treatment plants are to the well-being of everyone,providing reliable service 24/7,protecting public
health and preserving the ocean environment?Do they understand our position of being the third largest wastewater
treatment plant west of the Mississippi River?Do they know all the services we provide,the environmental stewardship
projects we are involved in,and our commitment to protecting water,land,air and energy resources?
Does OCSD's current identity system portray our vision and operating philosophy?Is OCSD only portrayed to the
public through local news articles,voiced only by a small minority of our service area?
OCSD's primary audience for this project is its service area customers: 80%residential—homeowners,apartment
dwellers,and 20%business and industry owners who pay permit fees(other target audiences listed in attached OCSD
Communications Services Strategic Plan, Fiscal Year 2003-04).However,OCSD has indirect contact with its
residential customers,who are billed for their sewer user fees twice a year as a line item on their property tax bill.A
newsletter or informational piece is not mailed with the"bill"explaining what their money is paying for and the
services we provide.
We have not conducted comprehensive,benchmark research on a large area of our service area and target audiences to
find out the answers to these most basic questions,"does the public know who we are and what we do,and how do they
currently perceive OCSD and our services/roles to the community."Current limited research that was conducted is
noted on page 5 and 6 of the attached OCSD Communications Services Strategic Plan,Fiscal Year 2003-04.
5.0 Goal and Objectives of Project
The goal of this project is to establish a corporate identity system that clearly communicates the Orange County
Sanitation District's functions and vision.
Project objectives include:
• Increase public awareness of who we are and what we do
• Have the public perceive us as the essential service we are
• Position ourselves within the community
• Reinforce our positive messages
• Determine the needs and expectations of the Community
• Increase stakeholder involvement
6.0 Project Timeframe
This project is broken into two phases.Phase 1 research work is estimated to begin in March 2004,for a period of four
months from Notice to Proceed.The work period for Phase 2 is estimated to start in OCSD Fiscal Year 2004-05 starting
July 1,2004 through June 30,2005.Phase 2 work deliverables are dependent on outcomes of Phase 1,and pending
approval to proceed if a change to OCSD's name/identity is recommended.
7.0 Phase 1 Qualitative and Quantitative Research and Assessment—Tasks and Deliverables
7.1 Conduct Research Studies of:
• OCSD's service area demographics and ethnic groups.
• OCSD as referenced in the media,including past and current events from news articles,technical journals,
broadcasts and OCSD press releases.
• Peer review of OCSD to similar wastewater treatment agencies or publicly-owned treatment works by:
(1)size,(2)county demographics,and(3)located in California. Include information on:
— Target markets and messages
A3 of 6 DRAFT 12/01/03
OCSD/GM/COM 130/CB:dk
M:\Graphics\DOCS\Corp ID Project 2003\SOW CorpiDstudy_1203_fmaldmft.doc
` RFP
ATTACHMENT A
Statement of Work
— Marketing effectiveness programs(awareness tracking,other effectiveness measurements)
— Branding strategies and treatments
7.2 Establish Customer and Stakeholder Baseline Information—on customer awareness and image of OCSD.
It shall cover,but not necessarily be limited to identity,image and awareness of OCSD,perceived strengths
and weaknesses,public information/education efforts,and communication channels(best ways for OCSD to
reach out).
• External:conduct a minimum of four focus groups and 500 random telephone surveys with general public
(customers)within OCSD's service area(specify how many cities,ethnic groups included),including
representatives of other external OCSD target audiences.
• Internal:conduct random surveys and one-on-one interviews with OCSD board members,general manager
and employees to evaluate their opinion,and their perception of customer opinion,of OCSD's image and
identity.
7.3 Establish Strategic Positioning
• Review OCSD's current business strategy and position,stakeholder perceptions and future direction
of our agency.
• Report analysis of research findings.
7.4 Review of OCSD's Current Corporate Identity System—Conduct an audit of OCSD's identity system and
branding strategies.Work shall include compiling and reviewing all logos and name applications,project
associations,and branded collateral materials/items that are under OCSD's jurisdiction.A written
recommendation of a strategy to increase consistency in brand connection between OCSD's services and
outreach,projects and materials/items shall be submitted.
Part of the assessment of the OCSD's Corporate Identity System will be to determine if the political will of
stakeholders would embrace a name/identity change and if the agency is equipped—financially and from a
human resources standpoint—to undergo a name/identity change that will need to be implemented throughout
the entire agency.
7.5 Assessment—No Name/Identity Change
• Create internal/external corporate identity standards manual.
• Proposal for elements and schedule of a public awareness/marketing campaign to educate the community
and continuously market OCSD messages.Proposal shall include cost,goals and objectives,duration,
implementation plan,and plan for training and educating employees of key messages.The plan shall also
include the means to evaluate campaign success with evaluation tool(s)to consider mediums used,
frequency,how it is reaching/targeting individuals,the saturation/coverage of service area,and means for
public feedback to evaluate effectiveness.
7.6 Assessment—Name/Identity Change is Recommended
• Layout process and work plan for developing a new name and identity,and retain agreement to proceed.
• Identify elements that would need to be changed with new identity,propose priorities,forecast length of time
it would take and estimate the costs(changes and costs not included in this project's scope).
• Submit proposal and timeframe for new identity rollout campaign.It shall include,but not necessarily be
limited to internal and external workshops,examples of new stationary system,new collateral materials,
PSAs and advertising and press kit/media materials.
8.0 Phase 2 Rollout—Tasks and Deliverables
8.1 Rollout—No Name/Identity Change
• Implement marketing campaign.
• Conduct a minimum of four follow-up focus groups and 500 telephone surveys to measure change in
awareness of target audiences.
A4 of 6 DRAFT 12/01/03
OCSD/GM/COM 130/CB:dk
M:\Graphics\DOCS\Corp ID Project 2003\SOW_CorpIDstudy_1203_fmaldraft.doc
RFP
ATTACHMENT A
Statement of Work
8.2 Rollout—Name/Identity Change is Recommended
• Name and logo development.
• Conduct presentations,selection procedure and approval process for new identity.
• Conduct trademark search on new name/tagline and/or logo artwork.
• Finalize final artwork.
• Create internal/external corporate identity standards manual.
• Develop launch plan and initial rollout campaign for new identity.
• Implement rollout campaign of new identity internally and externally.
• Conduct a minimum of four follow-up focus groups and 500 telephone surveys to measure change in
awareness of target audiences.
9.0 Deliverables
9.1 Reports and Proposals—in MS Word or PDF format that includes an executive summary,separate reviews
of findings for each element of the Statement of Work tasks,and appendices with raw or supporting
documentation.
9.2 Final Logo/Identity Artwork(if applicable)—in PC-formatted CorelDraw or Illustrator vector files,other
file types to be specified by OCSD graphics staff.
9.3 Corporate Identity Standards Manual—in MS Word or PDF format that includes,but is not limited to:
• Name identity information.
• Logo history/background and meaning.
• Proper usage of name,acronym and references.
• Proper usage of logo for various media applications.
• Graphic design standards.
• Boilerplate language(typical and news release versions).
• Color palette and typography specifications.
10.0 General Requirements
10.1 Project Management—One project manager shall be designated as the key contact person to OCSD.This
person will serve as the day-today contact and overall program coordinator.The project manager shall have
the authority to make commitments and decisions that are binding to the consulting firm/team.The project
manager for OCSD is Carol Beekman,Communications Division Manager.OCSD will assign a specified staff
member(s)as the day-to-day contact during this project.
10.2 Meetings and Presentations—consultant will conduct regular standing meetings at OCSD's facilities and will
specify how OCSD will be kept updated on project progress including work plan schedules and contact reports.
• Project manager and project team to conduct a kickoff meeting with OCSD project staff within two weeks of
Notice to Proceed. Include objectives,preliminary schedule and milestones for project.
• Project manager to provide meeting agendas and progress reports prior to each meeting,and provide meeting
minutes within three business days after meeting.
• Project manager and/or project team to be available at OCSD's convenience for contingency meetings to
address unforeseen events.
• Project manager to give at least two formal presentations(one presentation to introduce project team
members and firm/team's background,and one presentation on final project findings and recommendations)
at a regularly scheduled OCSD department heads and general manager meeting(prescheduled every Monday
morning between 8 AM and noon).
A5 of DRAFT 12/01/03
OCSD/GM/COM 130/CB:dk
M:\Graphics\DOCS\Corp ID Project 2003\SOW_CorpIDstudy_1203_frnaldraft.doc
` RFP
ATTACHMENT A
Statement of Work
• Project manager to be available at OCSD's convenience to give at least two formal 1-hour presentations at a
regularly scheduled OCSD Board Committee and/or Board of Directors Meeting(meetings prescheduled
each month on Wednesday night between the hours of 5 PM and 9 PM).
10.3 Progress Reports—submit a formal monthly status report in MS Word.This document will include an
executive summary on project's progress and status,detailed status on the work accomplished for that period,
problems encountered,anticipated problems,budget update,work to be accomplished and future milestones.
10.4 Billing Requirements—invoices shall include detailed breakdown of all activities itemized and showing hours
for all staff services,including administrative and support,by task with totals for each.Subconsultants work
shall be broken down and shown in the same manner.
10.5 Additional Requirements and Information—copies and examples of OCSD's corporate identity system and
collateral material will be provided upon award of contract.A tour of both treatment plant facilities will
provided to the consultant fttm/team upon request.All documents submitted must be in either PDF format,MS
Word,MS Excel,MS PowerPoint or MS Project format,unless specified otherwise.
10.6 Project Calendar—the days identified within this Scope of Work are workdays.Workdays are defined as all
days that are not Saturday,Sunday,or legally observed holidays. Meetings with OCSD staff shall be scheduled
from Monday through Thursday between the hours of 8 AM and 4 PM(exception is operations staff who
maintain plant operations 24/7 and work a rotated 12-hour shift)and shall conform to OCSD work schedules.
OCSD review periods shall not include legal observed holidays.
A6of6 DRAFT 12/01/03
OCSD/GM/COM 130/CB:dk
M:\Graphics\DOCS\Corp ID Project 2003\SOW_CorplDstudy_1203_fmaldraft.doc
l
,I
MINUTES OF
SPECIAL WALKING TOUR OF THE GROUNDWATER REPLENISHMENT SYSTEM
AND MEETING OF
JOINT GROUNDWATER REPLENISHMENT SYSTEM COOPERATIVE COMMITTEE
OF THE ORANGE COUNTY SANITATION DISTRICT
AND THE ORANGE COUNTY WATER DISTRICT
January 12, 2004, 4:30 p.m.
A Special Walking Tour of the Groundwater Replenishment System at the Orange County
Water District facility began at 4:30 p.m. and concluded just prior to the regularly
scheduled 5:30 p.m. meeting of the Joint Cooperative Committee. The following persons
were present:
OCSD Committee Members & Alternates OCWD Committee Members &Alternates
Norman Eckenrode, Vice Chair Philip Anthony, Chair (absent)
Shirley McCracken Paul Cook
Brian Donahue Lawrence Kraemer, Jr.
Brian Brady, Alternate No. 1 Kathryn Barr, Alternate No. 1
Paul Walker, Alternate No. 2 Brett Franklin, Alternate No. 2
Steve Anderson, Alternate No. 3 Richard Chavez, Alternate No. 3 (absent)
OCSD Directors OCWD Directors
John Collins Wes Bannister
OCSD Staff OCWD Staff
Blake Anderson, General Manager Virginia Grebbien, General Manager
Ana Burkhart Craig Miller, Assistant General Manager
Michael Markus, Program Manager
Others Present Bill Everest, Design Manager
Paul Brown, Camp Dresser & McKee, Inc. Shivaji Deshmukh, Senior Engineer
Dick Corneille, Camp Dresser & McKee, Inc. Mehul Patel, Senior Engineer
Debra Burris, DDB Engineering Joanne Daugherty, Engineer
Abdul Rashidi, Montgomery Watson Harza Anthony Manzano, Principal Engineer
David Mosher, Montgomery Watson Harza Ron Wildermuth, Director of Communications
Brenda Deeley, Porter Novelli Jenny Wedge, Public Affairs
Linda Martin, Porter Novelli Marilyn Kuga, Recording Secretary
Iry Pickler, I.P.A.
PLEDGE OF ALLEGIANCE
Following the Pledge of Allegiance to the Flag, Vice Chair Norm Eckenrode called the
meeting to order,
CONSENT CALENDAR
Upon motion duly made, seconded and carried, the Consent Calendar was approved
as follows:
1. Minutes of Previous Meeting
The Minutes of the December 1, 2003 Joint Cooperative Committee Meeting were
approved as mailed.
2. Issuance of Change Order No. 1 to OCB Reprographics Purchase Order for
Reprographic Services
Recommended for OCWD approval at the January 21, 2004 Board meeting:
Authorize issuance of Change Order No. 1 to OCB Reprographics Purchase Order
No. 241375 in the amount of$50,000 for reprographic services.
MATTERS FOR CONSIDERATION
3. Contract No. GWRS-2001-3 Southeast Barrier Pipeline (Mladen Buntich
Construction Co., Inc.): Change Order No. 10 and Notice of Completion
Senior Engineer Shivaji Deshmukh explained that the change order contingency for the
Southeast Barrier Pipeline project had exceeded 10% with Change Order No. 10;
therefore, it was being brought to the Committee for approval for an increase in contract
price of$64,943 and an extension of time of 52 calendar days. When questioned
regarding the difference between a change order and a potential change order, General
Manager Virginia Grebbien confirmed that a potential change order is essentially a request
from a contractor that has not yet been approved. She then directed the Committee's
attention to a table entitled, Final Change Order Report, which detailed change order
amounts and percentages, and which would be provided for the tracking of each project.
Staff also assured the Committee that Pegasus School is happy with the landscaping and
that a positive relationship has been established with them.
Upon motion made by Director Cook, seconded by Director Barr and carried, the
Committee recommended that the OCWD Board, at its January 21, 2004 meeting:
1. Authorize issuance of Change Order No. 10 to Contract No.
GWRS-2001-3, Southeast Barrier Pipeline (Mladen Buntich), for an
increase in the contract price of $64,943 and a 52-calendar-day
extension to the contract completion date; and
2. Accept completion of work and authorize filing of Notice of Completion.
2
4. Contract No. GWRS-2163, Process Control System Pre-Selection Agreement
(Westinghouse Process Control, Inc., an Emerson Company): Change Order No. 1
Engineer Laura Thomas reported that Westinghouse Process Control, Inc., an Emerson
Company, was pre-selected as the Process Control System (PCS) supplier in October
2002 using the 30% design pricing structure of the Advanced Water Treatment Facility
(AWTF). Now that the design is final, this contract needs to be increased by $1,065,350,
bringing the updated cost for the PCS to $3,017,592, of which $2,793,363 would apply to
the GWR System. Ms. Thomas added that staff is currently in the process of reviewing the
Systems Integrator Statement of Qualifications.
Upon motion made by Director Kraemer, seconded by Director Cook and carried,
the Committee recommended that the OCWD Board, at its January 21, 2004 meeting:
Authorize issuance of Change Order No. 1 to Contract No. GWRS-2163, Process
Control System Pre-Selection Agreement, to Westinghouse Process Control, Inc., an
Emerson Company, in the amount of$1,065,350 for a total contract amount of
$3,017,592.
INFORMATIONAL ITEMS
5. Proiect Schedule and Budget Update
Mr. Markus updated the Committee on the status of the seven major contracts that
comprise the Groundwater Replenishment System Project.
With regard to the Advanced Water Treatment Facility (AWTF) contract, the Committee
agreed with staffs determination that the bidding period on this project be extended four
weeks to allow the contractors more time to evaluate the contract and put together a good,
competitive bid. An AWTF Contract— Potential Bidders List was distributed for the
Committee's review.
6. Construction Projects Progress
Mr. Markus, referring to slides, reviewed the overall layout of the GWR System and
reported on the status of the Southeast Barrier Pipeline and Initial Microfiltration/Site
Power Distribution projects. A walking tour conducted just prior to this committee meeting
covered the areas Mr. Markus discussed in this slide presentation.
7. Monthly Chanqe Order Update
Mr. Markus reported that this new report is part of the change order policy and will be
presented on a monthly basis to summarize the status of any change orders that have
been executed the prior month. He added that details of this report can be found in the
spiral-bound Monthly Progress Report that Montgomery Ward Harza consultant Abdul
Rashidi produces.
3
8. Status Report
• Public Information and Education Update—
Communications Director Ron Wildermuth began his presentation with an update on
recent outreach efforts, support letters received from minority clinics, his attendance at a
WateReuse Conference wherein the issues of agency trust were discussed, and that a
dedication ceremony is being scheduled for late February or early March for the GWR Unit
3 Pipeline project.
Mr. Wildermuth then updated the Committee on recent and ongoing complaints made by
residents of the nearby Ward Street neighborhood. The most recent issue was brought
about when Southern California Edison (SCE) erected two poles in this neighborhood.
Approximately 20 residents signed a letter petition, which they filed with the Public Utilities
Corporation (PUC) claiming that SCE did not go through the proper procedures before
they put the poles in place. The Committee conducted an in-depth discussion that
addressed their concerns regarding constructions impacts to residents of this
neighborhood. Staff confirmed that they immediately began addressing the issue of SCE's
two poles, and will continue to work with neighbors on the ongoing issue of possible
vibration damage to homes. The Committee emphasized the importance of maintaining a
good relationship with these residents.
DIRECTORS' ANNOUNCEMENTS/REPORTS
Director Norm Eckenrode reported that he has been invited to speak to the Kiwanis Club in
Garden Grove on February 12, 2004 and asked that he be provided with materials and
supplies for this presentation. He also reported that the WateReuse Annual Conference
will be held from February 25 — 27, 2004 at Universal City.
GENERAL MANAGERS' ANNOUNCEMENTS/REPORTS
Ms. Grebbien reported that legal counsel for both OCSD and OCWD have agreed that
there is nothing to prohibit the concept of a combined campus, and that a meeting has
been scheduled this Thursday to discuss the mechanics of this concept.
General Manager Blake Anderson reported that OCSD would present to an upcoming JCC
meeting, then to OCWD's Board, the coordination of major OCSD projects that coincide
with completion of the GWR System due for completion in 2007.
DETERMINATION OF ITEMS TO BE PLACED ON CONSENT CALENDAR FOR THE
JANUARY 21, 2004 BOARD MEETING
Items No. 2, 3 and 4 were approved for the Consent Calendar for the January 21, 2004
Board Meeting.
4
0
ADJOURNMENT
The meeting was adjourned at 7:05 p.m.
5
BOARD OF DIRECTORS Meeting Date To Bd.of Dir.
02/25/04
AGENDA REPORT Item Number Item Number
15 b
Orange County Sanitation District
FROM: Dave Ludwin, Director of Engineering
Originator: Wendy Sevenandt, Associate Engineer III
SUBJECT: GROUNDWATER REPLENISHMENT SYSTEM, JOB NO. J-36,
JOINT COOPERATIVE COMMITTEE NAME CHANGE
GENERAL MANAGER'S RECOMMENDATION
Authorize changing the name of the "Joint Groundwater Replenishment System
Cooperative Committee" to the "GWR System Steering Committee."
SUMMARY
• In February 1997, the Joint Cooperative Committee was established to act as an
advisory board for development of the Groundwater Replenishment System (GWR
System).
• On November 12, 2002, a joint operating agreement between the Orange County
Sanitation District and the Orange County Water District was executed continuing
the Joint Cooperative Committee (JCC).
• The current name of the Committee does not clearly communicate the purpose of
the Committee to outside stakeholders.
• A proposal was put forth to the JCC to change the name of the "Joint Cooperative
Committee" to the "GWR System Steering Committee."
• The JCC recommends that the Boards approve the name change to the "GWR
System Steering Committee."
PRIOR COMMITTEE/BOARD ACTIONS
October 23, 2002 — Approval of the Joint Exercise of Powers Agreement for the
Development, Operation, and Maintenance of the Groundwater Replenishment System
and the Green Acres between Orange County Water District and Orange County
Sanitation District.
September 24, 2003 — Approve Addendum No. 1 to the Joint Agreement.
PROJECT/CONTRACT COST SUMMARY
This name change does not impact project cost.
ibdepttagenda\Board Agenda Reports12004 Board Agenda Reports\0204\1tem 15(b).GWRS Comm.doc
Revised: 06/04/03 Page 1
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑'I Not applicable
ADDITIONAL INFORMATION
See attached Agenda Item Submittal to the Joint Cooperative Committee.
ALTERNATIVES;
By not approving this agenda item, the Board members would elect to keep original
name of Joint Cooperative Committee.
CEQA FINDINGS
The Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the
Groundwater Replenishment (GWR) System was certified by the Orange County
Sanitation District (OCSD) and the Orange County Water District (OCWD) Board of
Directors on March 24, 1999. Addendum No. 1 was approved by both Boards on March
28, 2001 . Addendum No. 2 was approved by OCSD on January 23, 2002, and by
OCWD on January 16, 2002. Addendum No. 3 to the EIR was received and filed by the
Joint Cooperative Committee on December 1 , 2003.
ATTACHMENTS
Agenda Item Submittal to the JCC re: Committee Name Change
WTS:gc
\\fi1er-1\ocsd\ntg1obaMgenda Draft Reports\Joint Boards\GWRS J-36 JCC name change 022504.doc
H:\dept\agenda\Board Agenda Reporfs\2004 Board Agenda Reports\0204\I1em 15(b).GWRS Comm.doc
Revised: 06/04l03 Page 2
AGENDA ITEM SUBMITTAL
Meeting Date: February 9, 2004 Budgeted: Yes
Funding Source: OCWD/OCSD/Grants
To: Joint Groundwater Replenishment Program/Line Item No.: 501-5049-722.70-01
System Cooperative Committee Cost Estimate: N/A
From: Virginia Grebbien General Counsel Approval: N/A
Blake Anderson Project Report Approved: Yes
CEQA Compliance: Yes
Staff Contact: Ron Wildermuth
Subject: COMMITTEE NAME CHANGE
SUMMARY
The current name of the Committee does not clearly communicate the purpose of the
Committee to outside stakeholders. A proposal is being put forth to change the name
of the "Joint Cooperative Committee" to one that more clearly identifies its purpose
such as the "GWR System Steering Committee".
RECOMMENDATION
Agendize for the February 18 OCWD and February 25 OCSD Board Meetings:
Approve changing the name of the "Joint Cooperative Committee" to the "GWR System
Steering Committee".
DISCUSSION/ANALYSIS
The GWR System has moved into the construction phase and this Committee will be
communicating with more outside stakeholders than they have in the past. The current
title of the Committee is fairly non-descript and does not effectively communicate its
function. It has been suggested that a more appropriate name for the Committee may
be the "GWR System Steering Committee" since the purpose of the Committee is to
guide the project through construction and into successful implementation.
PRIOR COMMITTEE ACTIONS
None.
BOARD OF DIRECTORS Meeting Date To Bd.of Dir.
02/25/04
AGENDA REPORT item Number item Number
16
Orange County Sanitation District
FROM: Davis Ludwin, Director of Engineering
Originator: Milind Joshi, Project Manager
SUBJECT: ABANDONMENT OF AIRBASE TRUNK SEWER - CALIFORNIA STREET
CONTRACT NO. 6-13-3
GENERAL MANAGER'S RECOMMENDATION
(1) Approve Plans and Specifications for Abandonment of Airbase Trunk Sewer -
California Street, Contract No. 6-13-3, on file at the office of the Board Secretary-,
(2) Approve Addendum No. 1 to the plans and specifications-, (3) Receive and file bid
tabulation and recommendation-, and (4) Award a construction contract to Mike Prlich
and Sons, Inc. for Abandonment of Airbase Trunk Sewer - California Street, Contract
No. 6-13-3, for an amount not to exceed $507,610.
SUMMARY
• This contract is for abandonment of two existing sanitary sewer lines within
California Street.
• The project was designed by Boyle Engineering Corporation. The Plans and
Specifications were completed on November 6, 2003. Sealed bids were received on
December 16, 2003. Summary information on Contract No. 6-13-3 budget and bids
are as follows:
Project Budget.- $975,293
Construction Budget: $682,000
Engineer's Estimate: $680,000
Low Responsive Bid: $507,610
High Bid: $1 ,067,540
Number of Bids: 8
• The Director of Engineering recommends award of the construction contract to Mike
Prlich and Sons, Inc. for an amount not to exceed $507,610.
PRIOR COMMITTEE/BOARD ACTIONS
None
PROJECT/CONTRACT COST SUMMARY
Authorization of $507,610 for the construction contract is being requested. This
authorization is within the project construction phase budget. Please refer to the
attached Budget Information Table for more information.
Revised: 06/04/03 Page 1
The Budget Information Table does not reflect any design cost because the design for
this project was completed under a separate contract (Contract No. 6-13).
BUDGET IMPACT
X This item has been budgeted. (Line item: 2003-04 Budget Book, Page 8-28)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
The project is needed because of the condition of the sanitary sewers that are being
abandoned. The sewers have deteriorated internally and can no longer be cleaned.
These sewers produce excessive odors due to the overall condition of the sewers and
due to the low flows in the sewers.
ALTERNATIVES
None
CEQA FINDINGS
This project was included in the 1999 Strategic Plan Program EIR certified on
October 27, 1999.
ATTACHMENTS
1 . Budget Information Table
2. Bid Tabulation
MJ:ba:eh:gc
K\ntglobakAgenda Draft Reports\Joint Boards\6-13-3 Contract Award_022504.doc
Revised: 06/04/03 Page 2
BUDGET INFORMATION TABLE
ABANDONMENT OF AIR BASE TRUNK SEWERS - CALIFORNIA STREET
CONTRACT NO. 6-13-3
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECT/PHASE AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED TO AUTHORIZATION TOTAL EXPENDITURE EXPENDED TO
BUDGET BUDGET INCREASE BUDGET DATE REQUEST AUTHORIZATION TO DATE DATE(%)
/DECREASE
Phase 1 -Project Development $ $ $ - $ S $ $ 0%
Phase 2-Preliminary Design $ $ $ $ S - $ $ $ 0%
Phase 3-Design $ $ $ - $ S - $ - $ $ 0%
Phase 4-Construction $ 794,000 $ 794,000 $ - $ 794,000 S 122,000 $ 507,610 $ 629,610 $ 1,492 0%
Phase 5-Commissioning $ 55,000 $ 55,000 $ $ 55.000 S 25,000 $ 25,000 $ 4,771 19%
Phase 6-Close-Out $ 20,157 $ 20,157 $ - $ 20.157 $ 10.000 $ 10,000 $ - 0%
Phase 7-Contingency $ 106,136 $ 106,136 $ - $ 106,136 $ - 1 $ - $ - 0%
PROJECT TOTAL $ 975,293 $ 975,293 $ - $ 975.293 S 157,000 $ 507,610 $ 664,610 $ 6.263 1%
Reimbursable Costs
PROJECT NET $ 975,293 $ 975,293 $ - $ 975,293 $ 157,000 $ 507,610 $ 664,610 $ 6.263
PSA/Contract
Design PSA $ - $ S - $ - li: $ - $ - $ - $
Construction Contract S 682,000 $ 682,000 S - $ 682,000 $ - $ 507,610 $ 507,610 $
NOTE:
The Phase 1 through Phase 3 for this project were completed as a part of the Design Contract No. 6-13.
EDMS:003763751
Date December 16, 2003
11:00 a.m.
ADDENDUM NO.: 1
BID TABULATION
Abandonment of Airbase Trunk Sewer California Street
Contract No. 6-13-3
Engineer's Estimate: $ 680,000 Construction Contract Budget: $682,000
CONTRACTOR TOTAL BID
1. Mike Prlich and Sons, Inc. $ 507,610.00
2. Metro Builders & Engineers Group Ltd. $ *618,513.20
3. So. Calif. Underground Contractors, Inc. $ 683,150.00
4. Clark Contracting Corporation $ 740,240.00
5. Valverde Construction, Inc. $ 789,552.00
6. Albert W. Davies, Inc. $ 938,077.00
7. ARB $ 952,652.00
8. KEC Engineering $ 1,067,540.00
1 have reviewed the proposals submitted for the above project and find that the low bid
is a responsible bid. I, therefore, recommend award to Mike Prlich and Sons, Inc. in the
bid amount of $507,610.00 as the lowest and best bid.
*Corrected amount. (Metro Builders & Engi e s Group Ltd.) incorrect total was
$671,378.60 J
David A. Ludwin, P.E.
Director of Engineering
C:Tile NetWIP\6-13-3 Bid Tab.doc
Revised 05/19/98
OCSD P.O.Box 8127 Fountain Valley,CA 92728-8127 • (714) 962-2411
I
Environmental Stewardship
L , ' E.~ W
CD
POOR- I P,
-1
.11
79
10
Ill:
W
Wastewater Management
1
Table of Contents
NO
Section1 - Overview...................................................................................................................1
Section 2-Joint Operating Budget Review
Chart of the Cost per Million Gallons by Department— Budget and Actual............................1
Chart of the Net Expenses by Major Category— Budget and Actual.....................................1
Divisional Contributions to Gallonage Charge.......................................................................2
Comparison of Expenses by Department..............................................................................3
Summary of Expenses by Major Category..............................................
Summary of Joint Operating Revenues by Line Item............................................................5
Summary of Expenses by Line Item......................................................................................6
Summary of Expenses by Treatment Process......................................................................8
Chart of Staffing Trends.........................
Section 3 - Capital Improvement Program Review
Capital Improvement Program Graphs by Type and Funding Source...................................1
Summary of Capital Improvement Construction Requirements - Current Year.....................2
Summary of Capital Improvement Construction Requirements - Project Life........................6
Section 4- Budget Review by Revenue Area
Summary Budget Reviews -All Revenue Areas ...................................................................1
Consolidated Revenue Area Budget Review.........................................................................2
Revenue Area No. 14 Budget Review ..................................................................................3
Section 5— Self Insurance Budget Review
tw
General Liability Fund Budget Review ..................................................................................1
Workers' Compensation Fund Budget Review......................................................................2
kv
izo
bw
FY 2003-04 Mid-Year Report
IW
This Page Intentionally Left Blank
W
W
i
r
i.r
overview
Overview
' Mid-Year Financial Report
December 31, 2003
.d
The Finance Department is pleased to present the FY 2003-04 mid-year
comprehensive financial report. This report provides the Directors, staff, and the
general public with a comprehensive overview of the financial condition of the District
and reports on the status of all capital projects in progress. A summary of the sections
contained within this report is provided below.
Joint Operating Budget Review: At December 31, 2003, 52.19 percent, or$40.19
million of the FY 2003-04 net joint operating budget of $77.01 million has been
expended. Net operating expenses increased by $10.33 million from the same period
last year, primarily due to 1) increased salaries, wages, and employee benefits as a
result of thirty-five additional full-time equivalent employees, 2) increased costs of
chemicals as a result of disinfecting the effluent, and 3) increased costs for biosolids
removal due to providing more secondary treatment.
The total cost per million gallons at December 31, 2003 is $899.98 based on flows of
44.66 billion gallons, or 242.72 million gallons per day. This is $58.35, or 6.93 percent
above the budgeted cost per million gallons of $841.63. This higher cost per million
gallons is primarily due to net expenses being 4.38 percent, or$1.69 million higher than
the proportionate budget through December 31, 2003. The remaining increase is due
to flows being 2.91 percent lower than the budgeted 250 million gallons per day.
Some of the significant joint operating results as of December 31, 2003 include:
• Salaries, Wages and Benefits—Overall, personnel costs are near to being on target
�+ at 51.92 percent of budget through mid-year. Leave payoffs are at 112.72 percent
due to annual accrued leave payouts occurring in December. Additionally, regular
salaries are at 54.88 percent due to the salary increases implemented as of the
kid latest MOU's being slightly higher than were anticipated when the budget was
prepared. Salaries in the first six months also included MOU increases from July
2002 for many employees. It is anticipated that personnel costs will be slightly
above budget at fiscal year-end.
• Memberships — Membership expense totaled $236,300, or 100.08 percent of the
,..� $236,200 budget as of December 31 because nearly all of the District's
memberships are paid in the first half of each year. These costs are expected to
approximate budget at year-end.
Operating Expenses— Overall operating expenses totaled $6,514,200, or 42.33
percent of the composite $15,390,750 budget. Chemicals comprise the majority of
w these operating expenses. The increase in chemical costs is not as large as was
anticipated when the budget was prepared. Based on current processes, chemical
costs are anticipated to parallel the budget throughout the remainder of the year and
to be at or below budget at year-end.
Section 1 - Page 1
L
FY 2003-04 Mid-Year Report
i
J.
This Page Intentionally Left Blank
Section 1 - Page 6
Overview
w Mid-Year Financial Report
December 31, 2003
The Finance Department is pleased to present the FY 2003-04 mid-year
comprehensive financial report. This report provides the Directors, staff, and the
general public with a comprehensive overview of the financial condition of the District
and reports on the status of all capital projects in progress. A summary of the sections
contained within this report is provided below.
Joint Operating Budget Review: At December 31, 2003, 52.19 percent, or$40.19
million of the FY 2003-04 net joint operating budget of$77.01 million has been
expended. Net operating expenses increased by$10.33 million from the same period
last year, primarily due to 1) increased salaries, wages, and employee benefits as a
result of thirty-five additional full-time equivalent employees, 2) increased costs of
chemicals as a result of disinfecting the effluent, and 3) increased costs for biosolids
- removal due to providing more secondary treatment.
The total cost per million gallons at December 31, 2003 is $899.98 based on flows of
44.66 billion gallons, or 242.72 million gallons per day. This is $58.35, or 6.93 percent
above the budgeted cost per million gallons of $841.63. This higher cost per million
gallons is primarily due to net expenses being 4.38 percent, or$1.69 million higher than
the proportionate budget through December 31, 2003. The remaining increase is due
to flows being 2.91 percent lower than the budgeted 250 million gallons per day.
Some of the significant joint operating results as of December 31, 2003 include:
• Salaries, Wages and Benefits—Overall, personnel costs are near to being on target
at 51.92 percent of budget through mid-year. Leave payoffs are at 112.72 percent
due to annual accrued leave payouts occurring in December. Additionally, regular
salaries are at 54.88 percent due to the salary increases implemented as of the
latest MOU's being slightly higher than were anticipated when the budget was
prepared. Salaries in the first six months also included MOU increases from July
2002 for many employees. It is anticipated that personnel costs will be slightly
above budget at fiscal year-end.
• Memberships— Membership expense totaled $236,300, or 100.08 percent of the
$236,200 budget as of December 31 because nearly all of the District's
memberships are paid in the first half of each year. These costs are expected to
approximate budget at year-end.
.id
• Operating Expenses—Overall operating expenses totaled $6,514,200, or 42.33
percent of the composite $15,390,750 budget. Chemicals comprise the majority of
„W these operating expenses. The increase in chemical costs is not as large as was
anticipated when the budget was prepared. Based on current processes, chemical
costs are anticipated to parallel the budget throughout the remainder of the year and
to be at or below budget at year-end.
Section 1 - Page 1
.d
FY 2003-04 Mid-Year. Report
• Professional Services — Overall professional services totaled $1,012,800, or 36.56 yam,
percent of the composite $2,770,000 budget. Legal, Audit & Accounting, FIS
Support, and Labor Negotiation Services are all higher than the proportionate
budget through mid-year due to the majority of the services being provided early in i'7►
the fiscal year. Other professional services such as Engineering, Software Program
Consulting, Energy Consulting, and Industrial Hygiene Services are all
proportionately low through mid-year due to being in the planning or request for
proposal stages, having gotten started later in the fiscal year, or the need for the
service being re-evaluated. It is anticipated that the overall costs for this category
will increase in the third and fourth quarters of the fiscal year.
• Research & Monitoring — Research & Monitoring costs totaled $864,500, or 52.62 u
percent of the composite $1,643,000 budget. Due to the timing of when services
are provided, Air Quality Monitoring has very few costs while Research costs are at -
63.98 percent of the budget through mid-year. It is anticipated that the overall costs
for this category will continue to parallel the budget throughout the remainder of the
year.
• Utilities — Utilities costs totaled $2,551,400, or 54.66 percent of the composite
$4,667,900 budget. These costs are proportionately high through December 31 due
to higher than anticipated costs for electricity as a result of high meter readings. e
Staff is working with Southern California Edison (SCE) regarding differences in
District meter readings versus SCE meter readings. It is anticipated that the meter
reading difference will be resolved and the cost for electricity will be more in line with
the budget by the end of the fiscal year.
• Insurance — Insurance expense totaled $405,100, or 32.41 percent of the
$1,250,000 budget. This expense is lower than the proportionate budget through
December 31 due to the budget being prepared prior to the actual premium costs
and insurance coverage being known. Insurance expense is anticipated to total W
approximately $810,000 at year-end.
• Regulatory Operating Fees—At mid-year, regulatory operating fees totaled
$210,500, or 102.57 percent of the $205,200 budget. This expense is
proportionately higher than budget through mid-year due to the annual NPDES fee
being $128,500 when it was budgeted at the FY 02-03 cost of$20,000. As a result,
regulatory operating fees are expected to exceed the budget at year-end by
approximately$100,000.
• Other Non-operating Expense - At mid-year, other non-operating expenses are at
$281,300, or 103.53 percent of the $271,700 budget. This expense mainly
represents the identification of obsolete inventory items and is proportionately higher
than budget through mid-year due to the obsolescence identification being
performed during the first half of the fiscal year. This item is expected to
approximate budget at year-end.
w
Section 1 - Page 2
Overview
• Net Cost Allocation — Cost allocation totaled $9.76 million, or 42.37 percent of the
$23.04 million budget. The allocation of costs to capital projects is expected to
increase throughout the rest of the year as the District focuses on the design of
•� secondary treatment facilities.
• Power Sales Revenue — Power sales revenue is $23,200, or 5.95 percent of the
$390,000 budget through December 31. This revenue is proportionately low due to
potential problems with SCE's meters and the subsequent remittance of sales
revenue. It is anticipated that the meter reading difference will be resolved and the
revenue for electricity sales will be more in line with the budget by the end of the
fiscal year.
The summary of expenses by treatment process shows a 105.42 percent increase in
the secondary treatment process from the same time period last year. This increase is
a result of the emphasis placed on additional secondary treatment as the District
progresses toward full secondary treatment of effluent. The summary of expenses by
treatment process also shows a 334.24 percent increase in the utilities process from
the same time period last year. This increase is a result of the extra power needed for
the additional secondary treatment process.
Comparison of Mid-Year Cost per Million Gallon Results
With Year-End Actuals (Budget)
Last Five Years
950 899.98
..r
841.63
875
.r 800 730.32
725 682.17
650
575.42 563.09
"'- 575 523.74
51278.
488.57 500.75
500-
.r
425 - -
99-00 0000=01 01-02 02_03 03_04
2nd Year 2nd Year 2nd Year 2nd Year 2nd Annual
n.+
Qtr end Qv end Qtr end Qtr end Qtr Budget
As demonstrated in the preceding graph, the cost per million gallons at mid-year was
within 2.5 percent of year-end totals for fiscal years 1999-00, 2000-01 , and 2001-02
while the mid-year cost per million gallons was 6.5 percent below the year-end actual.
Section 1 - Page 3
r
FY 2003-04 Mid-Year Report
Although FY 2003-04 appears to be an anomaly with mid-year costs being 6.93 percent
above the annual budget, staff believe that overall joint operating costs will approximate
budget by year-end.
Section 2 - Page 1 provides a graphical comparison of each Department's actual
contribution towards the gallonage charge through mid-year of FY 2003-04 and as
budgeted for FY 2003-04. Page 1 also provides a budget to actual graphical
comparison of revenues and expenses by major category.
More detailed information is provided at the following locations: Section 2 - Page 2
provides for the divisional contributions to the gallonage charge through mid-year for
the current and two prior years; Section 2 — Page 3 provides a comparison of expenses
by department through December 31 for the current and two prior years; Section 2 —
Page 4 provides a summary of expenses by major category through December 31 ,
2003 and 2002; Section 2 — Page 5 provides a summary of joint operating revenues by
line item through December 31 . 2003 and 2002: Section 2 — pages 6 and 7 provide a
summary of expenses by line item through December 31 , 2003 and 2002; Section 2 —
Page 8 provides a summary of expenses by treatment process through December 31 ,
2003 and 2002; Section 2 — Page 9 provides staffing trends over the last five years
including total positions authorized, actual positions filled, and vacant positions.
Capital Outlay Review:
$250,000.000 .r
S200.000,000
$150.000,000
S100,000.000
$50.000,000
s0
12/31/03 Actual Projected 2003-04 2003-04 Capital Outlay
Capital Outlay Capital Outlay Cashilow Budget
S55,760,339 $145,453.800 $199,952,600
As depicted by the preceding chart, Capital Outlay expenditures totaled S55,760,300 or •--
27.89 percent of the capital outlay cashflow budget for FY 2003-04 as of December 31 ,
2003. Costs are proportionately low through mid-year as many projects are still in the
design phase or have experienced various delays. Capital outlay costs are expected to
be $145,453,800, or 72.74 percent of budget at year-end.
Section 3 - Page 1 provides a graphical presentation on the dollar amount of capital
expenditures incurred for each process category and a graphical presentation on the
Section 1 - Page 4
Overview
�; dollar amount of capital expenditures incurred for each major capital improvement
funding source.
40 For more detailed information, Section 3 — Pages 2 through 5 provide a summary of the
construction requirements of each project for the current year and Section 3— Pages 6
through 9 provide a summary of the construction requirements of each project over the
project life.
Budget Review by Revenue Areas: At December 31, 2003, revenues from all
Revenue Areas totaled $372,570,400 million, or 77.36 percent of budget. Debt
proceeds, the largest revenue source, was issued in August for$280 million and is at
100 percent of the budget.
Tax allocation and subvention revenue, budgeted at $41.2 million, is at 60.00 percent of
budget and Other User Fees, budgeted at $99.28 million is at 53.69 percent of budget.
These revenues are anticipated to approximate budget at year-end.
Capacity rights sales, budgeted at $6,195,000, are at 84.78 percent of budget at mid-
year. During October, the District sold capacity rights to the Santa Ana Watershed
Project Authority for$5.25 million. No additional capacity rights sales are anticipated
for the year. The capital assessment to the Irvine Ranch Water District, budgeted at
r^ $2,259,000 is at 70.36 percent of the budget at mid-year. This revenue is expected to
approximate budget at year-end.
'•' Connection fees, budgeted at $9.12 million, are at 35.71 percent of budget, or $3.26
million, due to lower than anticipated building activity within the member cities. Interest
earnings are proportionately low through mid-year due to lower than anticipated interest
rates.
Expenses and outlays of all Revenue Areas totaled $125.48 million, or 38.44 percent of
budget through mid-year. The costs incurred related to capital improvement projects
are proportionately low at $55.76 million or 27.89 percent of budget, as previously
explained in the Capital Outlay Section. All other expenses are near the proportionate
budget through mid-year.
Self-insurance Budget Reviews: The District is self-insured for portions of workers'
compensation, property damage, and general liability. Separate fund accounting is
utilized for the recording of revenue and expenses incurred in managing these liability
claims. The revenues to these funds represent individual Revenue Area contributions
"r based on flows. Expenses to these funds include actual claims paid, claims
administration, and excess loss policies.
a� The Self-Insurance Fund revenues totaled $1,857,400 or 49.84 percent of the
$3,727,000 budget at December 31, while total expenses were $1,365,700 or 46.28
percent of the $2,951,000 budget.
Section 1 - Page 5
FY 2003-04 Mid-Year Report -
w
This Page Intentionally Left Blank tow
4w
Section 1 - Page 6
1
�a�na�v►�oC
Ciu��eaa60
w
-_Joint Operating Budget Review
•r Cost per Million Gallons by Department
Budget and Actual
December 31, 2003
r_
$750
S675
•r
$600
S525
S450
S375
5300
$225
$150
75
$$o
Executive Finance Human Technical Engineering Operations& Information
Management Resources Services Maintenance Technology
■Budget f Actual
+� Net Expenses by Major Category
Budget and Actual (in thousands)
December 31, 2003
w= S55,000
S50,000
�.r $45,000 —--—
540,000 - — — -—
$35,000 - --- — — —�-- --- -'
$30,000
S25,000 —
S20,000
$15.000 -—
S10,000 -
Woe $5,000
SO
ot3 > y ,� a Cn
m y y c a L c e6 c m > c
C1 y W m f`p C C A C U U O
v_ �
X a` Ow 0 (n orn �' � ¢ '� mCc
2 m 4 w D_ 4Cr
. L G U
in O N
rw
■Budget ■Actual
Section 2 - Page 1
AW
FY 2003-04 Mid-Year Report
Summary of Expenses by Treatment Process
For the Six Months Ended December 31, 2003
Increase Increase
Actual Actual (Decrease) (Decrease)
I V31103 I V31102 $ %
Treatment Process:
Preliminary Treatment $ 2,985,629 $ 2,619,686 $ 365,943 13.97%
Primary Treatment 2,840,158 2,684,568 155,590 5.80%
Secondary Treatment 3,948,671 1,922,239 2,026,432 105.42%
Cryogenic Plant(Plant 2) 295,301 311,853 (16,552) -5.31% IJ
Effluent Disposal 506,879 270,657 236,222 87.28%
Solids Handling 15,618,832 12,239,273 3,379,559 27.61% ` t
Cogeneration 4,214,787 3,867,769 347,018 8.97%
Utilities 3,919,302 902,573 3,016,729 334.24%
Electrical Distribution 478,655 357,713 120,942 33.81%
Miscellaneous Buildings 2,616,348 2,163,208 453,140 20.95%
Air Quality 799,302 758,846 40,456 5.33%
Laboratory 3,419.535 3,014,911 404,624 13.42%
Net Joint Operating Requirements 41,643,399 31,113,296 10,530,103 33.84%
Less: Revenues (1,450,423) (1,249,515) (200,908) 16.08%
Net Joint Operating Expenses $ 40,192,976 $ 29,863,781 $ 10,329,195 34.59%
I, i
L
1
Section 2-Page 8 U
Joint Operating Budget Review
Cost per Million Gallons by Department
Budget and Actual
December 31, 2003
$750
$675
ANN $600
S525
+40 S450
S375
S300
$225
$150
$75
$0 -
Executive Finance Human Technical Engineering Operations& Information
Management Resources Services Maintenance Technology
■Budget ■Actual
oa.
..r Net Expenses by Major Category
Budget and Actual (in thousands)
December 31, 2003
"ow $55,000
$50,000
$45,000
w
S40,000
$35,000
$30,000
$25,000 - -- -- - --
^r $20,000 - — — -
$15,000 --
$10,000 -
SO
N > y °a O 01 CM C N j y C y L Cp
C pa U 0 y U O N
A Zi U .2 U 2 O C C V7 U O
y N d .0 d .� 67 C a C N d d .0 a d ai3 p m
I E x rid � � Ow Urn 2 ) M ¢ ia � � ¢ Cr
am ¢ w rL r a
ro
■Budget ■Actual
�, Section 2 - Page 1
U
FY 2003-04 Mid-Year Report
Divisional Contributions to Gallonage Charge
For the Six Months Ended December 31, 6W
2003-04
12/31/01 12131102 Annual 12131/03
Actual Actual Budget Actual
Flow in Million Gallons 43,285.85 43,777.51 91,500.00 44,660.00
Flow in Million Gallons per Day 235.25 237.92 250.00 242.72 I I
General Manager's Department
General Management Administration $ 14.34 $ 17.39 $ 13.84 $ 19.74
Administrative Services 10.32 9.21 8.59 8.24 t
Communications 5.78 6.52 11.64 7.48
Subtotal 30.44 33.12 34.07 35.46
Finance Department
Finance Administration 16.38 13.45 16.84 13.32
Accounting 17.49 18.15 20.16 20.31
Purchasing&Warehouse 13.60 15.06 17.56 17.92
Subtotal 47.47 46.66 54.56 51.55
Human Resources Department
Human Resources Administration 13.14 5.99 7.13 9.63
Employee Development/Training - 3.09 7.69 5.71
Safety and Health 6.85 9.10 13.06 11.43 1
Human Resources - 5.77 6.09 6.47 4114
Subtotal 19.99 23.95 33.97 33.24
Technical Services Department
Technical Services Administration 6.84 8.55 8.68 11.55
Environmental Compliance&Monitoring 43.25 36.30 42.08 42.15
Environmental Sciences Laboratory 42.89 50.17 60.50 56.49
Source Control 35.98 37.19 42.97 46.39 i
Subtotal 128.96 132.21 154.23 156.58
Engineering Department
Engineering Administration 6.15 6.63 5.25 5.72
Planning 15.14 10.82 15.38 16.72 I A
Project Management Office 20.92 12.78 17.52 16.41 V
Engineering and Construction 36.74 53.01 56.98 62.71
Subtotal 78.95 83.24 95.13 101.56 -
Operations& Maintenance Department L
Operations&Maintenance Administration 3.27 5.49 7.31 7.53
O&M Process Engineering 11.86 15.96 20.73 21.25
Plant No. 1 Operations 89.88 113.97 152.14 147.37 y
Plant No.2 Operations 125.03 165.52 209.89 212.46 L
Mechanical Maintenance&Power Production 100.58 100.84 120.11 135.30
Instrumentation&Electrical Maintenance 63.12 71.71 74.47 76.19
Air Quality&Special Projects 13.42 14.69 18.30 17.38 i
Collection Facilities Maintenance 17.08 19.06 25.64 29.10 11.4
Plant Facilities Maintenance 52.67 51.33 54.94 57.21
Subtotal 476.91 558.57 683.53 703.79
Information Technology Department � 3
Information Technology Administration 9.36 6.91 3.34 3.67
Customer&Network Support 18.13 24.36 37.79 31.30
Programing &Database 12.62 13.23 17.15 17.40
Process Ctrl integration 12.53 15.07 17.96 16.52 i
Subtotal 52.64 59.57 76.24 68.89
Total Joint Operating Expenses 835.36 937.32 1,131.73 1,151.07
Less: Cost Allocation (229.28) (226.61) (251.85) (218.61) j
Net Joint Operating Requirements 606.08 710.71 879.88 932.46
Less:Revenues (30.66) (28.54) (38.25) (32.48)
Net Joint Operating Expenses $ 575.42 $ 682.17 $ 841.63 $ 899.98 j
Section 2- Page 2 I
Joint Operating Budget Review
Comparison of Expenses by Department
For the Six Months Ended December 31,
2003-04
12/31/01 12/31/02 Year to Date Budget%
Department and Division Actual Actual Budget 12/31/03 Realized
General Manager's Department
✓ General Management Administration $ 620,800 $ 761,497 $ 1,266,600 $ 881,699 69.61%
Administrative Services 446,905 402,993 785,570 368,014 46.85%
Communications 250,104 285,404 1,065,130 334,251 31.38%
Subtotal 1,317,809 1,449,894 3,117.300 1,583,964 50.81%
Finance Department
Finance Administration 709,236 588,821 1,541,200 594,915 38.60%
Accounting 757,221 794,422 1,845,040 906,908 49.15%
r1 Purchasing&Warehouse 588,845 659,106 1,606,650 800,198 49.81%
Subtotal 2,055,302 2,042,349 4,992,890 2,302,021 46.11%
Human Resources Department
Human Resources Administration 568,799 262,066 652,300 429,936 65.91%
Employee Development/Training - 135,196 703,920 255,059 36.23%
Safety and Health 296,711 398,542 1,194,930 510,520 42.72%
Human Resources - 252,496 557,160 289,157 51.90%
,.t Subtotal 865,510 1,048,300 3,108,310 1,484,672 47.76%
Technical Services Department
Technical Services Administration 296,285 374.316 794,440 515,720 64.92%
Environmental Compliance&Monitoring 1,871,957 1,589,262 3,850,660 1,882,405 48.89%
Environmental Sciences Laboratory 1,856,353 2,196,360 5,535,740 2,522,750 45.57%
Source Control 1,557,599 1,628,141 3,931,900 2,071,690 52.69%
Subtotal 5,582,194 5,788,079 14,112,740 6,992,565 49.55%
Engineering Department
Engineering Administration 266,126 290,137 480,200 255,258 53.16%
Planning 655,490 473,536 1.407,070 746,839 53.08%
Project Management Office 905,200 559,566 1,602,690 732,704 45.72%
Engineering and Construction 1,590,118 2,320,628 5,213,930 2,800,522 53.71%
Subtotal 3,416,934 3,643,867 8,703,890 4,535,323 52.11%
Operations&Maintenance Department
�.+ Operations&Maintenance Administration 141,573 240,549 668,800 336,380 50.30%
O&M Process Engineering 513,155 698,906 1,896,460 949,168 50.05%
Plant No. 1 Operations 3,890,704 4,989,506 13,921,130 6,581,389 47.28%
Plant No. 2 Operations 5,411,512 7,245,769 19,204,630 9,488,285 49.41%
'r Mechanical Maintenance&Power Production 4.353,886 4,414,692 10,989,900 6,042,646 54.98%
Instrumentation&Electrical Maintenance 2,732,144 3,139,346 6,814,140 3,402,470 49.93%
Air Quality&Special Projects 580,945 643,080 1,674,170 776,260 46.37%
Regional Assets&Services 739,296 834,440 2,346,300 1,299,532 55.39%
Facilities Maintenance 2,279,675 2,247,185 5,027,460 2,554,901 50.82%
Subtotal 20,642,890 24,453,473 62,542,990 31,431,031 50.26%
Information Technology Department
ewd Information Technology Administration 405,339 302,613 305,400 163,974 53.69%
Customer&Network Support 784,980 1,066,428 3,457,350 1,397,855 40.43%
Programing&Database 546,292 579,077 1,569,240 777,169 49.53%
Process Ctrl Integration 542,534 659,833 1,642.990 737,789 44.91%
Subtotal 2,279,145 2,607,951 6,974,980 3,076,787 44.11%
Total Joint Operating Expenses 36,159,784 41,033,913 103,553,100 51,406,363 49.64%
Less: Cost Allocation (9,924,797) (9,920,617) (23,043,600) (9,762,964) 42.37%
rw Net Joint Operating Requirements 26,234,987 31,113,296 80,509,500 41,643,399 51.72%
Less:Revenues (1,327,356) (1,249,515) (3,500,000) (1,450,423) 41.44%
Net Joint Operating Expenses $ 24,907,631 $ 29,863,781 $ 77,009,500 $ 40,192,976 52.19%
ow
Section 2- Page 3
slr
FY 2003-04 Mid-Year Report
Summary of Expenses by Line Item
For the Six Months Ended December 31, 2003
Expense %Expense Expense Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
Description 2003-04 12131/03 12/31/03 Budget 12/31/02 $ %
Salaries,Wages&Benefits
Salaries&Wages $ 42,630,100 $ 22,716,800 53.29% $ 19,913,300 $ 19,239,859 $ 3,476,941 18.07% AOL
Employee Benefits:
Retirement 5,512,000 2,775,082 50.35% 2,736,918 1,759,314 1,015,768 57.74% ( I
Group Insurances 5,797,300 2,576,145 44.44% 3,221,155 2,240,199 335,946 15.00% i4L
Tuition&Certification Reimb 101,190 29,222 28.88% 71,968 37,219 (7,997) -21.49%
Uniform Rental 82,200 33,011 40.16% 49,189 38,382 (5,371) -13.99%
Workers'Compensation 1.000,000 500,001 50.00% 499,999 249,997 250,004 100.00%
Unemployment Insurance 26,100 3.448 13.21% 22,652 10,393 (6,945) -66.82%
Total Benefits 12,518,790 5,916.909 47.26% 6,601,881 4,335,504 1,581,405 36.48%
Salaries,Wages&Benefits 55,148,890 28,633,709 51.92% 26,515,181 23,575,363 5,058,346 21.46% I j
Matl.Supply,&Services W
Administrative Expenses
Memberships 236,160 236,341 100.08% (181) 214,561 21,780 10.15% t
Office Exp-Supplies 143,500 66,030 46.01% 77,470 53,163 12,867 24.20% c
Office Expense-Other 90,100 29,455 32.69% 60,645 40,396 (10,941) -27.08%
Small Computer Items 233,700 80,982 34.65% 152,718 124,684 (43,702) -35.05%
Minor Furniture&Fixtures 164,930 102,589 62.20% 62,341 16,823 85,766 509.81%
Printing&Publication
Repro-In-House 299,600 169,170 56.47% 130,430 127,461 41,709 32.72%
Printing-Outside 79,500 11,495 14.46% 68,005 15,302 (3,807) -24.88%
Notices&Ads 41,900 17,270 41.22% 24,630 14,933 2,337 15.65% `Lw
Photo Processing 5,170 2,707 52.36% 2,463 1,238 1,469 118.66%
Training&Meetings 1-i
Meetings 328,600 115,334 35.10% 213.266 140,585 (25,251) -17,96%
Training 880,100 362,079 41,14% 518.021 197,991 164,088 82.88%
Operating Expenses _
Chemical Coagulants 2,569,000 1,141,489 44.43% 1,427,511 888,874 252,615 28.42%
Sulfide Control 3,598,000 1,280,977 35.60% 2,317,023 1,199,411 81,566 6.80% W
Odor Control 1.959,700 620,045 31.64% 1,339,655 751,189 (131,144) -17.46%
Disinfection 5.777,000 2.799,745 48.46% 2.977,255 1,966,567 833,178 42.37%
Chemicals-Misc&Cogen 27,750 20,607 74.26% 7.143 4,371 16,236 371.45% 1
Gasoline,Diesel&Oil 303.800 106,609 35.09% 197,191 4,225 102.384 2423.29% �•i
Tools 134,800 57,002 42.29% 77,798 125,090 (68,088) -54.43%
Safety equipment/tools 109,500 75,201 68.68% 34,299 73,133 2,068 2.83%
Solv, Paints&Jan.Supplies 48,000 38,186 79.55% 9,814 19,320 18,866 97.65%
Lab Chemicals&Supplies 468,200 289,572 61.85% 178,628 194,733 94,839 48.70%
Other Operating Supplies 371,000 73,379 19.78% 297,621 155,912 (82,533) -52.94%
Property Tax Fees 24,000 11,395 47.48% 12,605 11,172 223 2.00% I I
Contractual Services 1�
Solids Removal 9,600,000 4,790,868 49.90% 4,809,132 3,133.031 1,657,837 52.91%
Other Waste Disposal 631,000 312,991 49.60% 318,009 197,227 115,764 58.70% f
Groundskeeping 220,000 87,051 39.57% 132,949 90,535 (3,484) -3.85%
Janitorial 430,000 168,689 39.23% 261,311 139,620 29,069 20.82%
Outside Lab Services 277,100 53,353 19.25% 223,747 72,534 (19,181) -26.44%
Oxygen Plant Oper 340,000 157,764 46.40% 182,236 154,790 2,974 1.92% t I
Temporary Services 720,500 308,684 42.84% 411,816 306,596 2,088 0.68%
Security Services 250,000 113,740 45.50% 136,260 87,949 25,791 29.32%
Other 291,750 84,657 29.02% 207,093 71,937 12,720 17.68%
(Continued)
Section 2 -Page 6
Joint Operating Budget Review
t•+ Comparison of Expenses by Department
For the Six Months Ended December 31,
2003-04
00' 12/31/01 12/31/02 Year to Date Budget%
Department and Division Actual Actual Budget 12/31/03 Realized
General Manager's Department
icw General Management Administration $ 620,800 $ 761,497 $ 1,266,600 $ 881,699 69.61%
Administrative Services 446,905 402,993 785,570 368,014 46.85%
Communications 250,104 285,404 1,065.130 334,251 31.38%
Subtotal 1,317,809 1,449,894 3,117,300 1,583,964 50.81%
`.' Finance Department
Finance Administration 709,236 588,821 1,541,200 594,915 38.60%
Accounting 757,221 794,422 1,845,040 906,908 49.15%
,e.,, Purchasing&Warehouse 588,845 659,106 1,606,650 800,198 49.81%
Subtotal 2,055,302 2,042,349 4,992,890 2,302,021 46.11%
Human Resources Department
Human Resources Administration 568,799 262,066 652.300 429,936 65.91%
Employee Development/Training - 135,196 703,920 255,059 36.23%
Safety and Health 296,711 398,542 1,194,930 510,520 42.72%
Human Resources - 252,496 557,160 289,157 51.90%
Subtotal 865,510 1,048,300 3,108,310 1,484,672 47.76%
Technical Services Department
Technical Services Administration 296,285 374,316 794.440 515,720 64.92%
Environmental Compliance&Monitoring 1,871,957 1,589,262 3,850,660 1,882,405 48.89%
Environmental Sciences Laboratory 1,856,353 2,196,360 5,535,740 2,522,750 45.57%
Source Control 1,557,599 1,628,141 3,931.900 2,071,690 52.69%
Subtotal 5,582,194 5,788,079 14,112,740 6,992,565 49.55%
Engineering Department
Engineering Administration 266,126 290,137 480,200 255,258 53.16%
Planning 655,490 473,536 1,407,070 746,839 53.08%
Project Management Office 905,200 559,566 1,602,690 732,704 45.72%
Engineering and Construction 1,590,118 2,320,628 5,213,930 2,800,522 53,71%
Subtotal 3,416,934 3,643,867 8,703,890 4,535,323 52.11%
Operations&Maintenance Department
Operations&Maintenance Administration 141,573 240,549 668,800 336,380 50.30%
O&M Process Engineering 513,155 698,906 1,895,460 949,168 50.05%
Plant No. 1 Operations 3,890,704 4,989,506 13,921,130 6,581,389 47.28%
Plant No.2 Operations 5,411,512 7,245,769 19,204,630 9,488,285 49.41%
Mechanical Maintenance&Power Production 4,353,886 4,414,692 10,989,900 6,042.646 54.98%
Instrumentation&Electrical Maintenance 2,732,144 3,139,346 6,814,140 3,402,470 49.93%
Air Quality&Special Projects 580,945 643,080 1,674,170 776,260 46.37%
Regional Assets&Services 739,296 834,440 2,346,300 1,299,532 55.39%
Facilities Maintenance 2,279,675 2,247,185 5,027,460 2,554.901 50.82%
Subtotal 20,642,890 24,453,473 62,542,990 31,431,031 50.26%
Information Technology Department
+� Information Technology Administration 405,339 302,613 305,400 163,974 53.69%
Customer&Network Support 784,980 1,066,428 3,457,350 1,397,855 40.43%
Programing&Database 546,292 579,077 1,569,240 777,169 49.53%
Process Ctri Integration 542,534 659,833 1,642,990 737,789 44.91%
Subtotal 2,279,145 2,607,951 6,974,980 3,076,787 44.11%
Total Joint Operating Expenses 36,159,784 41,033,913 103,553,100 51.405,363 49.64%
Less: Cost Allocation (9,924,797) (9,920,617) (23,043,600) (9,762,964) 42.37%
Net Joint Operating Requirements 26,234,987 31,113,296 80,509,500 41,643,399 51.72%
Less:Revenues (1,327,356) (1,249,515) (3,500,000) (1,450,423) 41.44%
Net Joint Operating Expenses $ 24,907,631 $ 29,863,781 $ 77,009,500 $ 40,192,976 52.19%
er
Section 2- Page 3
ad
1
FY 2003-04 Mid-Year Report W
Summary of Expenses by Major Category l.r
For the Six Months Ended December 31,2003
Expense Expense Increase Increase Percent
Budget Through Through (Decrease) (Decrease) Budget Remaining
Description 2003-04 12131/03 12/31/02 $ % Realized Budget
Salary,Wages&Benefits $55,148,890 $28,633,709 $23,575,363 $ 5,058,346 21.46% 51.92% $26,515,181
Administrative Expenses 868,390 515,397 449,627 65,770 14.63% 59.35% 352,993
too
Printing&Publication 426,170 200,642 158,934 41,708 26.24% 47.08% 225,528
Training&Meetings 1,208,700 477,413 338,576 138,837 41.01% 39.60% 731,287
Operating Expenses 15,390,750 6,514,207 5,393,997 1,120,210 20.77% 42.33% 8,876,543
Contractual Services 12,760,350 6,077,797 4,254,219 1,823,578 42,87% 47.63% 6,682,553
Professional Services 2,770,020 1,012,825 767,599 245,226 31.95% 36.56% 1,757,195
Research&Monitoring 1,643,000 864,544 799,721 64,823 8.11% 52.62% 778,456
Repairs&Maintenance 6,659,660 3,552,929 2,568,185 984,744 38.34% 53.35% 3,106,731
Utilities 4,667,900 2,551,418 2,012,534 538,884 26.78% 54.66% 2,116,482I
Other Materials, -
Supplies,&Services 2,009,270 1,005,482 715,158 290,324 40.60% 50.04% 1,003,788
Net Cost Allocation (23,043,600) (9,762,964) (9,920,617) 157,653 -1.59% 42.37% (13,280,636)
Net J.O. Requirements 80,509,500 41,643,399 31,113,296 10,530,103 33.84% 51.72% 38,866,101
Revenues (3,500,000) (1,450,423) (1,249,515) (200,908) 16.08% 41.44% (2,049,577)
Net J.O. Expenses $77,009,500 $40,192,976 $29,863,781 $10,329,195 34.59% 52.19% $36,816,524
Gallonage Flow(MG) 91,500.00 44,660.00 43,777.51 882.49 2.02%
Gallonage Flow(MGD) 250.00 242.72 237.92 4.80 2.02%
Gallonage Flow(Vs/MG) $841.63 $899.98 $682.17 $217.81 31.93%
a�
i �
1�1
w
Section 2- Page 4
Joint Operating Budget Review
Summary of Joint Operating Revenues by Line Item
r+ For the Six Months Ended December 31, 2003
%
Revenue Revenue Revenue Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
tow Description 2003-04 12/31/03 12/31/03 Budget 12/31/02 $ %
Inter District Sewer Use $ 1,350,000 $ 776,676 57.53% $ 573,324 $ 570,802 $205,874 36.07%
Wastehauler 460,000 228,470 49.67% 231.530 223,219 5,251 2.35%
Sludge Disposal 850,000 294,391 34.63% 555,609 247,565 46,826 18.91%
CNG Sales 300,000 84,241 28.08% 215,759 129,642 (45,401) -35.02%
Other Sales - 7,187 N/A (7,187) 8,853 (1,666) -18.82%
Rents&Leases 25,000 15,361 61.44% 9,639 14,813 548 3.70%
General Non-Operating 125,000 20,906 16.72% 104,094 (3,330) 24,236 -727.81%
Power Sales 390,000 23,191 5.95% 366,809 57,951 (34,760) -59.98%
Total $ 3,500,000 $ 1,450,423 41.44% $2,049,577 $ 1,249,515 $200,908 16.08%
r�
+sd
r.a
r*
u+�
r�l
Section 2 - Page 5
FY 2003-04 Mid-Year Report
Summary of Expenses by Line Item
For the Six Months Ended December 31,2003
Expense %Expense Expense Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
Description 2003-04 12/31103 12/31/03 Budget 12/31102 $ %
Salaries,Wages&Benefits
Salaries&Wages $ 42,630,100 $ 22,716,800 53,29% $ 19,913,300 $ 19.239,859 $ 3,476,941 18.07%
Employee Benefits:
Retirement 5,512,000 2,775,082 50.35% 2,736,918 1,759,314 1,015,768 57.74%
Group Insurances 5,797.300 2,576,145 44.44% 3,221.155 2,240,199 335,946 15.00%
Tuition&Certification Reimb 101,190 29,222 28.88% 71.968 37,219 (7,997) -21.49%
Uniform Rental 82,200 33,011 40.16% 49,189 38,382 (5,371) -13.99% "
Workers'Compensation 1.000,000 500.001 50.00% 499,999 249,997 250,004 100.OD%
Unemployment Insurance 26,100 3.448 13.21% 22,652 10,393 (6,945) -66.82% S.d
Total Benefits 12.518,790 5,916.909 47.26% 6,601,881 4,335,5D4 1,681,405 36.48%
Salaries,Wages&Benefits 55,148,890 28,633.709 51.92% 26,515,181 23,575,363 5,058,346 21.46%
W
Matt,Supply,&Services
Administrative Expenses
Memberships 236,160 236,341 100.08% (181) 214,561 21,780 10.15%
Office Exp-Supplies 143,500 66,030 46.01% 77,470 53,163 12,867 24.20%
Office Expense-Other 90,100 29,455 32.69% 60,645 40,396 (10,941) -27.08%
Small Computer Items 233,700 80,982 34.65% 152,718 124,684 (43,702) -35.05%
Minor Furniture&Fixtures 164,930 102,589 62.20% 62,341 16,823 85,766 509.81%
Printing&Publication
Repro-In-House 299,600 169,170 56.47% 130,430 127,461 41,709 32.72%
Printing-Outside 79,500 11,495 14.46% 68,005 15,302 (3,807) -24.88%
Notices&Ads 41,900 17,270 41.22% 24,630 14,933 2,337 15.65%
Photo Processing 5,170 2,707 52.36% 2,463 1,238 1,469 118.66%
Training&Meetings
Meetings 328,600 115,334 35.10% 213,266 140,585 (25,251) -17.96%
Training 880,100 362,079 41.14% 518,021 197,991 164,088 82.88%
Operating Expenses
Chemical Coagulants 2,569,000 1,141,489 44.43% 1,427,511 888,874 252,615 28.42%
Sulfide Control 3,598,000 1,280,977 35.60% 2,317,023 1,199,411 81,566 6.80%
Odor Control 1,959,700 620,045 31.64% 1,339,655 751,189 (131,144) -17.469/6
Disinfection 5,777,000 2,799,745 48.46% 2,977,255 1,966,567 833,178 42.37%
Chemicals-Misc&Cogen 27,750 20,607 74.26% 7,143 4,371 16,236 371.45%
Gasoline,Diesel&Oil 303,800 106.609 35.09% 197,191 4,225 102,384 2423.29%
Tools 134.800 57,002 42.29% 77,798 125,090 (68,088) -54.43%
Safety equipment/tools 109,500 75,201 68.68% 34,299 73,133 2,068 2.83%
Solv,Paints&Jan.Supplies 48,000 38,186 79.55% 9,814 19,320 18,866 97.65%
Lab Chemicals&Supplies 468,200 289,572 61.85% 178,628 194,733 94,839 48.70%
Other Operating Supplies 371,000 73,379 19.78% 297,621 155,912 (82,533) -52.94%
Property Tax Fees 24,000 11,395 47.48% 12,605 11,172 223 2.00%
Contractual Services 'aw
Solids Removal 9,600,000 4,790,868 49.90% 4,809,132 3,133.031 1,657,837 52.91%
Other Waste Disposal 631,000 312,991 49.60% 318,009 197,227 115,764 58.70%
Groundskeeping 220,000 87,051 39.57% 132,949 90,535 (3,484) -3.85%
Janitorial 430,000 168,689 39.23% 261,311 139,620 29,069 20.82%
Outside Lab Services 277,100 53,353 19.25% 223,747 72,534 (19,181) -26.44%
Oxygen Plant Oper 340,000 157,764 46.40% 182,236 154,790 2,974 1.92%
Temporary Services 720,500 308,684 42.84% 411,816 306,596 2,088 0.68% 6J
Security Services 250,000 113,740 45.50% 136,260 87,949 25,791 29.32%
Other 291,750 84,657 29.02% 207,093 71,937 12,720 17.68%
(Continued) 1.d
Section 2 - Page 6
Im
Joint Operating Budget Review
two Summary of Expenses by Line Item
For the Six Months Ended December 31, 2003
,o Expense %Expense Expense Increase Increase
Budget Through Through Remaining Through (Decrease) (Decrease)
Description 2003-04 12/31/03 12/31/03 Budget 12/31/02 $ %
Continued:
�tl Professional Services
Legal 457,000 254,626 55.72% 202,374 239,144 15,482 6.47%
Audit&Accounting 75,000 47,800 63.73% 27,200 49,000 (1,200) -2.45%
Engineering 280,400 75,412 26.89% 204,988 43,629 31,783 72.85%
'~ Enviro Scientific Consulting 195,000 88,744 45.51% 106,256 96,912 (8,168) -8.43%
FIS Support 237,540 160,360 67.51% 77,180 31,080 129,280 415.96%
Software Prgm Consulting 155,000 15,906 10.26% 139,094 87,364 (71,458) -81.79%
Energy Consulting 40,000 - 0.00% 40,000 - - WA
Advocacy Efforts 328,000 161,247 49.16% 166,753 35,000 126,247 360.71%
Industrial Hygiene Services 48,900 900 1.84% 48,000 1,818 (918) -50.50%
Labor Negotiation Services 43,790 27,948 63,82% 15,842 25,201 2,747 10.90%
�+ Other 909,390 179,882 19.78% 729,508 158,451 21,431 13.53%
Research&Monitoring
Environmental Monitoring 980,000 500,019 51.02% 479,981 465,021 34,998 7.53%
Air Quality Monitoring 120,000 17,114 14.26% 102,886 2,381 14,733 618.77%
Research 543,000 347,411 63.98% 195,589 332,319 15,092 4.54%
Repairs&Maintenance
!� Materials&Services 5,201,520 2,995,266 57.58% 2,206,254 1,978,432 1,016,834 51.40%
Svc.Mtc.Agreements 1,458,140 557.663 38.24% 900,477 589,753 (32,090) -5.44%
Utilities
Telephone 198,600 112,572 56.68% 86,028 81,339 31,233 38.40%
Diesel For Generators 12,000 9,395 78.29% 2,605 6,681 2,714 40.62%
Natural Gas 1,889,100 883,357 46.76% 1,005,743 677,720 205,637 30.34%
Power 1,356,200 951,281 70.14% 404,919 716,628 234,653 32.74%
Water 1,212,000 594,813 49.08% 617,187 530,166 64,647 12.19%
Other Operating Supplies
Outside Equip Rental 50,700 23,544 46.44% 27,156 13,416 10,128 75.49%
`y Insurance 1,250,000 405,144 32.41% 844,856 458,912 (53,768) -11.72%
Freight 67,600 45,127 66.76% 22,473 32,647 12,480 38.23%
Misc.Operating Expense 164,100 39,920 24.33% 124,180 106,756 (66,836) -62.61%
too Regulatory Operating Fees 205,170 210,450 102.57% (5,280) 86,135 124,315 144.33%
General Manager
Contingency - - N/A - - - NIA
Prior year reappropriation - - N/A - - - WA
Other Non-Oper Expense 271,700 281,297 103.53% (9,597) 17,292 264,005 1526.75%
Matls,Supp,&Serv. 48,404,210 22,772,654 47.05% 25,631,556 17,458,550 5,314,104 30.44%
w+
Total Expenditures 103,553,100 51,406,363 49.64% 52,146,737 41,033,913 10,372,450 25.28%
Less:Cost Allocation (23,043,600) (9,762,964) 42.37% (13,280,636) (9,920,617) 157,653 -1.59%
NetJ.O.Requirements 80,509,500 41,643,399 51.72% 38,866,101 31,113,296 10,530,103 33.84%
Less: Revenues (3,500,000) (1,450.423) 41.44% (2,049,577) (1,249,515) (200,908) 16.08%
pt NetJ.O.Expenses $ 77,009,500 $ 40,192,976 52.19% $ 36,816,524 $ 29,863,781 $ 10,329,195 34.59%
ad
Section 2-Page 7
� r
FY 2003-04 Mid-Year Report
Summary of Expenses by Treatment Process
For the Six Months Ended December 31,2003
Increase Increase
Actual Actual (Decrease) (Decrease)
12131/03 12/31102 $ % �
Treatment Process:
Preliminary Treatment $ 2,985,629 $ 2.619,686 $ 365,943 13.97%
Primary Treatment 2,840,158 2,684,568 155,590 5.80%
Secondary Treatment 3,948,671 1,922,239 2,026,432 105.42% W
Cryogenic Plant(Plant 2) 295,301 311,853 (16,552) -5.31%
i
Effluent Disposal 506,879 270,657 236,222 87.28% lw
Solids Handling 15,618,832 12,239,273 3,379,559 27.61%
�aJ
Cogeneration 4,214,787 3,867,769 347,018 8.97%
Utilities 3,919,302 902,573 3,016,729 334.24%
Electrical Distribution 478,655 357,713 120,942 33.81%
Miscellaneous Buildings 2,616,348 2,163,208 453,140 20.95%
Air Quality 799,302 758,846 40,456 5.33%
Laboratory 3,419,535 3,014,911 404.624 13.42%
Net Joint Operating Requirements 41,643,399 31,113,296 10,530.103 33.84%
Less: Revenues (1,450,423) (1,249,515) (200,908) 16.08%
Net Joint Operating Expenses $ 40,192,976 $ 29,863,781 $ 10,329,195 34.59%
1w+
Ird
Section 2-Page 8
ui
Joint Operating Budget Review
Staffing Trends
Full Time Equivalents
December 31, 2003
625
596
574 567
37
519 63
525 510
559
541
425
6/30/2000 6/30/2001 6/30/2002 6/30/2003 12/31/2003
■Actual 13 Vacant
At December 31 , 2003, the total head count was 568 employees, or a full time equivalency of 558.75.
Section 2 - Page 9
FY 2003-04 Mid-Year Rep od
1
� i
jf
�..il
1 �
Il
This Page Intentionally Left Blank
ILt
ti
f
1r,1
I
Section 2-Page 10 I
li
i
may,
CIP Review
Capital Improvement Program
By Type and Funding Source
For the Six Months Ended December 31, 2003
Miscellaneous Utility
Support Systems Prior Year
Old Projects 2°6 Treatment Projects
3°6 121,6
Solids Handling
Collections 8 Digestion-196
Facilities Headworks-5°0
Odor Control
- - Projects-1*6
Equipment
2% Ilk Primary
Treatment
25%
Water
Management
Projects-11°e
Plant
Automation Ocean
3,o Process Secondary
Outjall Related Treatment
Systems Special 6%
7% Projects-1%
Total Capital Improvement Expenditure - $55,760,339
... $17,583,525
Replacement/
Rehabilitation
32%
S14,517,742
Improved
Treatment
26%
S3.419,607
Support
6*6
rwr
S20.239,465
Additional
Capacity
— 369.
Total Capital Improvement Expenditure - $55,760,339
Section 3 - Page 1
7
FY 2003-04 Mid-Year Report
Summary of Capital Improvement Construction Requirements -Current Year
For the Six Months Ended December 31, 2003
2003-04 2003-04 2003-04
Cashflow Actual at Projected
Budget 12/31/03 Outlay
Collection System Improvement Projects
Collections
Greenville Sullivan/Raitt STreet Manhole Rehab $ 5 5 tid
Santa Ana Trunk Sewer Rehab. 165 200
Lower Main-Broadway MH Rehabilitation - - -
Continuous Feed Chemical Treatment Facility 312.000 56,677 70,200
Trunk Sewer Mapping Project 900,000 238,897 485,200
Carbon Cnyn Sewer and Pump Stn.Abandonment 1,983,000 91,283 251,100
Santa Ana River Interceptor Relief Sewer - - -
Santa Ana River Interceptor Realignment and Prot. 40183,000 205,615 311,400
Abandonment of the Existing SARI in SA River - -
Abandonment of Yorba Linda Pump Station
i
Taft Branch Improvements
Atwood Subtrunk Improvements
Lower Santa Ana River Interceptor Improvements
Euclid Relief Improvements-Reach"A"
' r
Euclid Relief Improvements-Reach"B" W
Santa Ana River Relief Sewer,Reach B
Newhope-Placentia&Cypress Trunk Replacements -
Upper&Lower Newhope-Placentia MH Rehabilitation
SARI and South Anaheim Interceptor MH Rehabilitaiton
Rehabilitation of the Magnolia Trunk Sewer
Trask Branch of the Hoover-Western Subtrunk
Rehabilitation of the Westside Pump Station 236,000 43,909 99,700 1
Westside Relief Interceptor/Los Alamitos MH Rehab - - -
Rehabilitaiton of the Seal Beach and Edinger PS - - -
Lining of 36"NPTB FM(Junc Box to 2nd Angle Pt.) 517,000 493,492 493,500
Replacement of Back Bay Trunk Sewer 357,000 (44,942) (44,900) 1
Balboa Trunk Sewer Rehabilitaiton - - - M•�
Replacement of the Bitter Point Pump Station 1.515.000 38,699 238,700 _
Replacement of the Rocky Point Pump Station 1,000,000 150,925 2,971,800
Rehabilitation of the 14th Street Pump Station 190,000 45,206 269,200 V�
Rehabilitation of the"A"Street Pump Station 281,000 295,632 473,000
Rehabilitation of the Bay Bridge Pump Station - 4,036 17,800
Rehabilitation of the Crystal Cove Pump Station 248,000 28,072 231.000
PCH FM Bitter Pt PS to Coast Trunk @ Bhurst&PCH 260,000 155,057 323,500
Big Canyon Trunk Sewer Rehab&Replacement 804.000 - -
Abandonment of AB Trunk,Watson and Cal.Sewers 55,000 27,757 27,800 --
Abandonment of Airbase Trunk Sewer-California St 948,000 15,355 140,400
Abandonment of Airbase Trunk(Watson St)&College 3,110,000 - -
Covey Lane Pump Station Abandonment 60.000 32,841 32.900
Sunflower interceptor Manhole Rehab 447.000 3,881 282.200
Gisler Redhill Trunk Sewer Relocation-Phase 1 145,000 475 54,700
Gisler-Redhill System Improvements,Reach B 337.000 48,469 269,100
Replacement of the College Ave Pump Station 212,000 61,801 116,000 -
Rehabilitaiton of the MacArthur Pump Station 84,000 30,697 68,000
Tustin West/Lemon Heights Trunk Improvements 48,000 - - W
Lower Gisler-Redhill Trunk Relocation and MH Rehab -
Gisler Redhill Trunk Improv&Orange Trunk Improv 2,163,000 - --
i
Upper Gisler-Redhill MH Rehabilitaiton&Campus Dr - - -
Modifications to the Main Street Pump Station(28%) 236,040 194,419 252,900
Newland Street Intereptor Sewer Protection 112,000 365 54,500
Warner Avenue Relief Sewer 2,222,000 2,980,267 5,078.900 1
(Continued)
Section 3 - Page 2
Wo
CIP Review
.r Summary of Capital Improvement Construction Requirements -Current Year
For the Six Months Ended December 31,2003
2003-04 2003-04 2003-04
Cashflow Actual at Projected
Budget 12/31/03 Outlay
(Collections continued)
Edinger/Bosla Chica Trunk Improvements _ - -
Coast Trunk Sewer Rehabilitaiton 56,000 29,635 124,500
Facilities Engineering Projects-Collections 317,000 431,811 584,500
Bushard Trunk Sewer Rehabilitation 11.999,000 4,853,367 14,502,500
,.� Pump Station P&IDS and Equipment Tagging 720,000 - 45,000
Additional Charges to CIP Closed at 6130/03 - 611,955 3,045,200
Subtotal-Collections 36,057,040 11,125,818 30,870,500
Revenue Area 14
Modifications to the Main Street Pump Station(72%) 606,960 499,933 650,300
Additional Charges to CIP Closed at 6/30/03 -
Subtotal-Revenue Area 14 606,960 499,933 650,300
Total Collection System Improvement Projects 36,664,000 11,625,751 31,520,800
Treatment&Disposal Projects
Collections Facilities
Rehabilitate District Siphons By Adding Air Jumper 106,000 7,515 114,700
Replacement of the Ellis Ave Pump Station 1,999,000 277,403 642,100
Subtotal-Collections Facilities 2,105.000 284,918 756,800
Headworks
PLC Programming and Integration 393,000 12,776 32,000
Sunflower Drive Replacement 87,000 26,432 155,000
Headworks Rehabilitation/Refurbishment - 1,176 1,200
Headworks Improvements at Plant No.2 4,561,000 2,585,886 6,859,400
Subtotal-Headworks 5,041,000 2,626,270 7,047,600
Primary Treatment
Pri.Clarifiers 16-31&Related Facilities 14,660,000 13,368,302 21,991.900
Primary Treatment Rehab/Refurb 53,000 115.230 517,100
d Circular Clarifier Drive Replacement/Upgrade 1,142,000 1,172,487 1,823,700
Sludge Density Meter Upgrades 780,000 586 400,000
Subtotal-Primary Treatment 16,635,000 14,656,605 24,732,700
Secondary Treatment
New Secondary Treatment System at Plant No.1 451,000 214,291 1,403,100
Trickling Filter Rehabilitation and New Clarifiers 12,000,000 2,862,256 10,255,900
Activated Sludge Plant Rehabilitation 350,000 139,836 1,801,600
Sec Treat Monitoring&Cntrl Sys Upgrad 5,560,000 116.913 1,456.100
Secondary Plant Rehabilitation 243,000 247.019 501,500
New Trickling Filters 100,000 - 739,600
Oxygen Plant Replacement/Rehabilitation Assess 40,000 13,016 306,900
Activated Sludge Aeration Basin Selector Study 788,000 20,438 60,000
Computer Modeling of Activated Sludge System 120,000 - 20,000
Subtotal-Secondary Treatment 19,652,000 3,613,769 16,544,700
Solids Handling&Digestion
Sludge Digester Rehabilitation at Plant 1 519,000 42,385 232,400
Sludge Dewatering and Odor control at Plant 1 317,000 43,054 195,200
Ammonia Side Stream Treatment 557,000 - -
Digesters,Centrifuge/Press&Cake Storage Hopper - - -
Solids Storage and Truck Loading Facility 1,077,000 159,796 710,800
(Continued)
Section 3- Page 3
..1
FY 2003-04 Mid-Year Report
Summary of Capital Improvement Construction Requirements-Project Life
For the Six Months Ended December 31, 2003
Current Total
Approved June 30,2003 Year Projected Remaining
Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2004 Budget
Collection System Improvement Protects
Colloctions
Greenville Sullivan/Raitt STreet Manhole Rehab $ 3,269,000 $ - $ - $ - $ 3,269,000
Santa Ana Trunk Sewer Rehab. 14,638.000 403,673 200 403,873 14,234,127
Lower Main-Broadway MH Rehabilitation 1,467,000 - - - 1,467,000
Continuous Feed Chemical Treatment Facility 451,000 40 70,200 70,240 380,760
Trunk Sewer Mapping Project 2,013,000 1,620,747 485,200 2,105,947 (92,947)
Carbon Cnyn Sewer and Pump Stn.Abandonment 3,467.000 356,375 251,100 607,475 2,859,525 j
Santa Ana River Interceptor Relief Sewer 17,272,000 - - - 17,272,000 U
Santa Ana River Interceptor Realignment and Prot. 63,620,000 2,334,141 311,400 2,645,541 60,974,459
Abandonment of the Existing SARI in SA River 8,456,000 151 - 151 8,455,849
Abandonment of Yorba Linda Pump Station 955,000 - - - 955.000 t
Taft Branch Improvements 3,508,000 9,386 - 9,386 3,498,614 b.d
Atwood Subtrunk Improvements 3,187,000 110,352 - 110,352 3,076,648
Lower Santa Ana River Interceptor Improvements 35,012,000 - - - 35,012,000
Euclid Relief Improvements-Reach"A" 20,856.000 13,510 - 13,510 20,842,490
Euclid Relief Improvements-Reach"B" 10,319,000 - - 10,319,000
Santa Ana River Relief Sewer,Reach B 32,702,000 - - - 32,702,000
Newhope-Placentia&Cypress Trunk Replacements 28,785,000 - - - 28,785,000 I
Upper&Lower Newhope-Placentia MH Rehabilitation 4,351,000 - - - 4,351,000 L
SARI and South Anaheim Interceptor MH Rehabilitaiton 3,087,000 - - - 3,087,000
Rehabilitation of the Magnolia Trunk Sewer 48,868,000 - - - 48,868,000
Trask Branch of the Hoover-Westem Subtrunk 1,410,000 - - - 1,410,000
Rehabilitation of the Westside Pump Station 2,991,000 199,375 99,700 299,075 2,691,925 ("
Westside Relief Interceptor/Los Alamitos MH Rehab 17,136,000 - - - 17,136,000
Rehabilitaiton of the Seal Beach and Edinger PS 8,574,000 - - - 8,574,000
Lining of 36"NPTB FM(Junc Box to 2nd Angle Pt.) 1,996,000 1,348,522 493,500 1,842,022 153,978
Replacement of Back Bay Trunk Sewer 7,189,000 6,781,547 (44,900) 6.736,647 452,353
Balboa Trunk Sewer Rehabilitaiton 5,759,000 - - - 5,759,000
Replacement of the Bitter Point Pump Station 8,159,000 402,722 238,700 641,422 7,517,578
Replacement of the Rocky Point Pump Station 9,362,000 190,663 2,971,800 3.162.463 6.199,537
Rehabilitation of the 14th Street Pump Station 4,617,000 900,058 269,200 1,169,258 3.447,742
Rehabilitation of the"A"Street Pump Station 5,013,000 1,279,892 473,000 1,752,892 3,260,108
Rehabilitation of the Bay Bridge Pump Station 2,612,000 146,204 17,800 164,004 2,447.996
Rehabilitation of the Crystal Cove Pump Station 1,512,000 184,169 231,000 415,169 1,096,831
PCH FM Bitter Pt PS to Coast Trunk @ Bhurst&PCH 13,927,000 47,196 323,500 370,696 13,556,304
Big Canyon Trunk Sewer Rehab&Replacement 2,534.000 - - - 2,534,000
Abandonment of AB Trunk,Watson and Cal-Sewers 351,000 303,603 27,800 331,403 19,597
Abandonment of Airbase Trunk Sewer-California St 975.000 4,885 140,400 145,285 829,715
Abandonment of Airbase Trunk(Watson St)&College 3,276.000 - - - 3,276,000
Covey Lane Pump Station Abandonment 153,000 156,690 32.900 189,590 (36,590) !
Sunflower interceptor Manhole Rehab 3,991,000 566,134 282,200 848,334 3,142,666
Gisler Redhill Trunk Sewer Relocation-Phase 1 936,000 - 54,700 54,700 881,300
Gisler-Redhill System Improvements,Reach B 6,893.000 189,220 269,100 458,320 6,434,680
Replacement of the College Ave Pump Station 6,021,000 7,023 116,000 123,023 5,897,977 I
Rehabilitaiton of the MacArthur Pump Station 2,355,000 25,691 68,000 93,691 2,261,309
Tustin West/Lemon Heights Trunk Improvements 5,926,000 - - - 5,926,000
Lower Gisler-Redhill Trunk Relocation and MH Rehab 6,615,000 - - - 6,615,000 -
Gisler Redhill Trunk Improv&Orange Trunk Improv 23,561,000 - - - 23,561,000 ` 1
Upper Gisler-Redhill MH Rehabilitaiton&Campus Dr 2,121,000 - - - 2,121,000 1.1
Modifications to the Main Street Pump Station(28%) 271,320 18,455 252,900 271,355 (35)
Newland Street Intereptor Sewer Protection 127,000 38,541 54,500 93,041 33,959
Warner Avenue Relief Sewer 7,480,000 692,136 5,078,900 5,771,036 1,708,964 LrJ
(Continued)
Section 3-Page 6 L
Wo
CIP Review
ow Summary of Capital Improvement Construction Requirements -Current Year
For the Six Months Ended December 31,2003
2003-04 2003-04 2003-04
rd Cashfiow Actual at Projected
Budget 12131/03 Outlay
(Collections continued)
Edinger/Bosla Chica Trunk Improvements - - -
k* Coast Trunk Sewer Rehabilitaiton 56,000 29,635 124,500
Facilities Engineering Projects-Collections 317,000 431,811 584,500
Bushard Trunk Sewer Rehabilitation 11,999,000 4,853,367 14,502,500
.M. Pump Station P&IDs and Equipment Tagging 720,000 - 45,000
Additional Charges to CIP Closed at 6/30103 - 611,955 3,045,200
Subtotal-Collections 36,057,040 11,125,818 30,870,500
low Revenue Area 14
Modifications to the Main Street Pump Station(72%) 606,960 499,933 650,300
Additional Charges to CIP Closed at 6/30/03 -
Subtotal-Revenue Area 14 606,960 499,933 650,300
ow Total Collection System Improvement Projects 36,664,000 11,625,751 31,520,800
Treatment&Disposal Protects
Collections Facilities
Rehabilitate District Siphons By Adding Air Jumper 106,000 7,515 114,700
Replacement of the Ellis Ave Pump Station 1,999,000 277,403 642,100
Subtotal-Collections Facilities 2,105.000 284,918 756,800
Headworks
PLC Programming and Integration 393,000 12,776 32,000
Sunflower Drive Replacement 87,000 26,432 155.000
Headworks Rehabilitation/Refurbishment - 1,176 1,200
Headworks Improvements at Plant No.2 4,561,000 2,585,886 6,859,400
Subtotal-Headworks 5,041,000 2,626,270 7,047,600
Primary Treatment
Pri.Clarifiers 16-31 &Related Facilities 14,660,000 13,368,302 21,991.900
Primary Treatment Rehab/Refurb 53,000 115,230 517,100
ow Circular Clarifier Drive Replacement/Upgrade 1.142,000 1,172,487 1,823,700
Sludge Density Meter Upgrades 780,000 586 400,000
Subtotal-Primary Treatment 16,635,000 14,656,605 24,732,700
�..r Secondary Treatment
New Secondary Treatment System at Plant No.1 451,000 214,291 1,403,100
Trickling Filter Rehabilitation and New Clarifiers 12,000,000 2,862,256 10,255,900
Activated Sludge Plant Rehabilitation 350,000 139,836 1,801,600
Sec Treat Monitoring&Cntrl Sys Upgrad 5,560,000 116,913 1,456,100
Secondary Plant Rehabilitation 243,000 247,019 501,500
New Trickling Filters 100,000 - 739.600
*d Oxygen Plant Replacement/Rehabilitation Assess 40,000 13,016 306.900
Activated Sludge Aeration Basin Selector Study 788,000 20.438 60,000
Computer Modeling of Activated Sludge System 120,000 - 20,000
Subtotal-Secondary Treatment 19,652,000 3,613,769 16,544,700_
+mod
Solids Handling&Digestion
Sludge Digester Rehabilitation at Plant 1 519,000 42,385 232,400
ar Sludge Dewatering and Odor control at Plant 1 317,000 43,054 195,200
Ammonia Side Stream Treatment 557,000 - -
Digesters,Centrifuge/Press&Cake Storage Hopper - - -
Solids Storage and Truck Loading Facility 1,077,000 159.796 710,800
(Continued)
Section 3- Page 3
FY 2003-04 Mid-Year Report
Summary of Capital Improvement Construction Requirements -Current Year tow
For the Six Months Ended December 31, 2003
2003-04 2003-04 2003-04
Cashflow Actual at Projected tao
Budget 12/31/03 Outlay
(Solids Handling&Digestion continued)
Digesters and Sludge Cake Hoppers at Plant 2 86,000 - 1,100
Digester Rehabilitation at Plant 2 264,000 207 142,200
Sludge Dewatering and Odor Control at Plant 2 - - -
High Rate Digester Mix Pumps Mach.Seals 32,000 35,066 35,100 16�
Sludge Grinder Replacement 20,000 - 20,000
Tule Ranch MaintBiosolids Management Needs 100,000 - 121,000
Subtotal-Solids Handling&Digestion 2,972,000 280,508 1,457,800
W
Ocean Outfall Systems
Peak Flow Management 1,500,000 169,778 1,060,400
Effluent Pumping Station Annex 8,001,000 432,927 2,203,900
Short Term Outfall Bacteria Reduction 3,651,000 2,987,854 3,018,200
NPDES Permit Renewal 355,000 38,934 114,000
Subtotal-Ocean Outfall Systems 13,507,000 3,629,493 6,396,500
Utility Systems
Electrical Power System Single-line Diagrams 911,000 455 87,800
Standby Power and Reliability Modifications 5,045,000 653,087 2,434,400
Cable Tray Improvements at Plants 1 &2 1,116,000 12,020 228,800
Central Generation Automation 2,002,000 196,854 822,300
Area Classification Studies Implementation Plan 5,062,000 66,702 6,955,900
Plant 1 66kV Substation 102,000 77 39,500
Gas Compressor Addition at Plant No.2 193,000 54,983 123,200
Utilities Rehabilitation and Refurbishment 1,478,000 62,333 339,000
Fuel Station Replacement at Plant No.2 433,000 22,467 22,500
Electrical Equipment Refurbishment and Protection 197,000 13,875 339,800
Rehabilitation of Low Pressure Gas Holder 422,000 - 50,000
Indoor/Outdoor Lighting Study 127,000 2,037 90.000 -
Plant 1 Plant water VFD Replacement 107,000 6,374 298,300
Subtotal-Utility Systems 17,195.000 1.091,264 11,831.500
Odor Control Related Projects
Facilities Modifications for Odor Control 1,500,000 250,283 1,922,000 W
Rehabilitation of Odor Control Facilities 711,000 150,955 1,411,000
Subtotal-Odor Control Related Projects 2,211,000 401,238 3,333,000
Plant Automation&Computerization
Power Monitoring and Control Systems 169,000 210 288,500
Plant Reinvention/Automation Project 903,000 430,980 721,200
Document Management - 24,425 30.000
Data Integration 569,000 194,407 500,000
Strategic Information Architecture(SIA) 50,000 152 50,000
Intemet/intranet Development 235,000 13,677 235,000
CMMS System Replacement 250,000 - 200,000
Source Control Programming 600,000 192,470 430,000
Geographic Information System 423.000 34,332 400,000 _
SCADA System Replacement Study 300,000 - 150,000
SCADA Graphics Tagging Update 255,000 - - Lod
Financial Information System Upgrade 880,000 637,462 880,000
Information Technology Disaster Recovery 304,000 - 10.000 -
Network Equipment Upgrade 604,000 30,954 57,000
Subtotal Plant Automation&Computerization 5,542,000 1,559,069 3,951,700
Section 3- Page 4
ow
CIP Review
,ow Summary of Capital Improvement Construction Requirements-Current Year
For the Six Months Ended December 31, 2003
2003-04 2003-04 2003-04
wd Cashflow Actual at Projected
Budget 12/31/03 Outlay
Process Related Special Projects
Standard Specifications Revisions and Updates 14.000 39 8,500
Effluent Pathogen Reduction Alternatives Plan 930,000 - 518,900
Plant O&M Manual and SOP Project-Phase 1 150,000 50,161 450,000
Hazardous Energy Control Procedures 296,000 114,074 250,000
Corrosion Management 3,761,000 48,655 75,000
Special Projects: Anoxic Gas Flotation(AGF) 268,000 42.283 50,000
Special Projects: Anaerobic Baffled Reactor(ABR) 469,000 12,033 22,000
Special Projects: Primary Effluent Filtration 110,000 519 1,000
use Special Projects: Oxygen Ionization/Odor Control 210,000 - -
Special Projects: Microfiltralion/Primary Effluent 595,000 249,442 290,000
Special Projects: Dewatering Options Comparison 99,000 - -
Special Projects: Biotrickling Filter(BTF) 48,000 90,438 161,000
Special Projects: Ammonia Reduction Options 277,000
Subtotal-Process Related Special Projects 7.227,000 607,644 1,826,400
Miscellaneous&Support Projects
Facilities Engineering Projects-Joint 1,145,000 18,335 579,000
Facilities Engineering Projects-Plant 1 1,145,000 140,912 697,700
Facilities Engineering Projects-Plant 2 1,145,000 174,775 730,400
*r Interim Fac Record&Eng Data Syst Maint Services 234,000 - 244,500
Supplemental Full Secondary Treatment CEQA Doc 153,000 - 215,100
Supplement No.1 to the 1999 Strategic Plan EIR 567,000 114.716 506,800
Long Range Biosolids Management Plan 2,669,000 362,165 905,700
Strategic Plan Update 1,420,000 113,089 712,000
Modifications to Existing Mach Systems 150,000 - -
Building Rehabilitation/Refurbishment 929,000 - 282,300
Space Allocation and Interior Renovation 2,615,000 119,472 325,800
Laboratory Rehabilitation 169,000 20,445 110,900
Tenant Improvements to Rebuild Shop 89,000 37,484 59,400
Engineering Trailer Complex 166,000 215,407 228,900
Support Building Power System Modifications 205.000 - 59,200
Security System Improvements 569,000 19,916 40,000
Small Cap.Equip.Replacement Project 500,000 330,748 500,000
Asset Management Program 4,226,000 - 100.000
Warehouse Reinvention Project 190,000 23,150 75,000
Plume Modeling 128,000 30,000 90,000
Plant 2 Maintenance Building Modifications 300,000 -
�,�,� Subtotal-Miscellaneous&Support Projects 18,714,000 1,720,614 6,462,700
Water Management Projects
Groundwater Replenishment System 43.125,000 5,522,711 17,622,800
Water Conservation 506,000 380,661 491,900
Co-op Projects,Inflow/infilt.Reduction 4,000,000 - 402,000
Long Term Permanent Monitoring Program 713,000 322,884 324,100
Subtotal-Water Management Projects 48,344,000 6,226,256 18,840,800
sad
Additional Charges to CIP Completed at 6130103 6,607,156 6,607,200
Total Treatment and Disposal Projects 159,145,000 43,304,804 109,789,400
Capital Equipment Purchases 4,143,600 829.784 4,143,600
Total Collections and Treatment&Disposal
Projects and Capital Equipment Purchases $199,952,600 $55,760,339 $145,453,800
u.r
Section 3- Page 5
FY 2003-04 Mid-Year Report
Summary of Capital Improvement Construction Requirements-Project Life
For the Six Months Ended December 31, 2003
Current Total
Approved June 30,2003 Year Projected Remaining
Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2004 Budget
Collection System Improvement Protects
Collections
Greenville Sullivan/Raitt STreet Manhole Rehab $ 3,269,000 $ - $ - $ - $ 3,269,000
Santa Ana Trunk Sewer Rehab. 14,638,000 403,673 200 403,873 14,234.127
Lower Main-Broadway MH Rehabilitation 1,467,000 - - - 1,467,000 {
Continuous Feed Chemical Treatment Facility 451.000 40 70,200 70,240 380.760
Trunk Sewer Mapping Project 2,013,000 1,620,747 485,200 2,105,947 (92,947) -
Carbon Cnyn Sewer and Pump Stn.Abandonment 3,467,000 356,375 251,100 607,475 2.859,525
Santa Ana River Interceptor Relief Sewer 17,272,000 - - - 17.272,000 6W
Santa Ana River Interceptor Realignment and Prot. 63,620,000 2,334,141 311,400 2.645,541 60,974,459
Abandonment of the Existing SARI in SA River 8,456,000 151 - 151 8,455,849
Abandonment of Yorba Linda Pump Station 955,000 - - - 955,000
Taft Branch Improvements 3,508,000 9,386 - 9,386 3,498,614 w
Atwood Subtrunk Improvements 3.187,000 110,352 - 110,352 3,076,648
Lower Santa Ana River Interceptor Improvements 35,012,000 - - - 35.012,000
Euclid Relief Improvements-Reach"A" 20,856,000 13,510 - 13,510 20.842,490 y�
Euclid Relief Improvements-Reach"B" 10,319,000 - - 10,319,000
Santa Ana River Relief Sewer,Reach B 32,702,000 - - - 32,702,000 -
Newhope-Placentia&Cypress Trunk Replacements 28,785,000 - - - 28,785,000
Upper&Lower Newhope-Placentia MH Rehabilitation 4,351,000 - - 4,351,000 I.d
SARI and South Anaheim Interceptor MH Rehabilitaiton 3,087,000 - - 3,087,000
Rehabilitation of the Magnolia Trunk Sewer 48,868,000 - - 48,868,000
Trask Branch of the Hoover-Westem Subtrunk 1,410,000 - - - 1.410,000
Rehabilitation of the Westside Pump Station 2,991,000 199,375 99,700 299,075 2.691,925
Westside Relief Interceptor/Los Alamitos MH Rehab 17,135,000 - - - 17,136,000
Rehabilitaiton of the Seal Beach and Edinger PS 8,574,000 - - - 8,574,000
Lining of 36"NPTB FM(Junc Box to 2nd Angle Pt.) 1,996,000 1,348,522 493,500 1,842,022 153.978
Replacement of Back Bay Trunk Sewer 7,189,000 6,781,547 (44,900) 6,736,647 452,353
Balboa Trunk Sewer Rehabilitaiton 5,759,000 - - - 5,759,000
Replacement of the Bitter Point Pump Station 8,159,000 402.722 238,700 641,422 7,517,578
Replacement of the Rocky Point Pump Station 9.362,000 190,663 2,971,800 3,162,463 6,199,537 1.1
Rehabilitation of the 14th Street Pump Station 4,617,000 900,058 269,200 1,169,258 3,447,742
Rehabilitation of the"A"Street Pump Station 5,013,000 1,279,892 473,000 1,752,892 3,260,108
Rehabilitation of the Bay Bridge Pump Station 2,612,000 146,204 17,800 164,004 2,447,996
Rehabilitation of the Crystal Cove Pump Station 1,512,000 184,169 231.000 415,169 1,096,831 1.s1
PCH FM Bitter Pt PS to Coast Trunk @ Bhurst&PCH 13,927,000 47,196 323,500 370,696 13,556,304
Big Canyon Trunk Sewer Rehab&Replacement 2,534,000 - - - 2,534.000
Abandonment of AB Trunk,Watson and Cal.Sewers 351,000 303,603 27,800 331,403 19,597 IMd
Abandonment of Airbase Trunk Sewer-Califomia St 975,000 4,885 140,400 145,285 829,715
Abandonment of Airbase Trunk(Watson St)&College 3,276,000 - - - 3,276,000
Covey Lane Pump Station Abandonment 153,000 156,690 32,900 189,590 (36,590)
Sunflower interceptor Manhole Rehab 3,991,000 566,134 282,200 848,334 3,142,666
Gisler Redhill Trunk Sewer Relocation-Phase 1 936.000 - 54,700 54,700 881,300
Gisler-Redhill System Improvements,Reach B 6,893.000 189,220 269,100 458,320 6,434,680
Replacement of the College Ave Pump Station 6,021,000 7,023 116,000 123,023 5,897,977
Rehabilitaiton of the MacArthur Pump Station 2,355,000 25,691 68,000 93,691 2,261,309 %401
Tustin West/Lemon Heights Trunk Improvements 5,926,000 - - - 5,926,000
Lower Gisler-Redhill Trunk Relocation and MH Rehab 6,615,000 - - 6,615,000 --
Gisler Redhill Trunk Improv&Orange Trunk Improv 23,561,000 - - - 23,561,000
Upper Gisler-Redhill MH Rehabilitaiton&Campus Dr 2,121,000 - - - 2,121,000 I"'I
Modifications to the Main Street Pump Station(28%) 271,320 18,455 252,900 271,355 (35)
Newland Street Intereptor Sewer Protection 127,000 38,541 54,500 93,041 33,959
Warner Avenue Relief Sewer 7,480,000 692,136 5,078,900 5,771,036 1,708,964 W
(Continued)
Section 3-Page 6
l�
CIP Review
Summary of Capital Improvement Construction Requirements -Project Life
For the Six Months Ended December 31,2003
Current Total
Approved June 30,2003 Year Projected Remaining
Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2004 Budget
(Collections continued)
Edinger/Bosla Chica Trunk Improvements 2,126,000 - - - 2,126,000
Coast Trunk Sewer Rehabilitaiton 16,635,000 8,411 124,500 132,911 16,502,089
Facilities Engineering Projects-Collections 5,400.000 190,468 584,500 774,968 4.625,032
cur Bushard Trunk Sewer Rehabilitation 39,393,000 9,085,557 14,502,500 23,588,057 15.804,943
Pump Station P&IDs and Equipment Tagging 720,000 - 45,000 45,000 675,000
Additional Charges to CIP Closed at 6/30/03 69,541,725 8.798,331 3,045,200 11,843,531 57,698,194
Subtotal-Collections 603.942,045 36,413,868 30,870,500 67,284,368 536,657,677
Revenue Area 14
Modifications to the Main Street Pump Station(72%) 697,680 47,455 650,300 697,755 (75)
Additional Charges to CIP Closed at 6/30/03
w.d Subtotal-Revenue Area 14 697,680 47,455 650,300 697,755 (75)
Total Collection System Improvement Projects 604,639,725 36,461,323 31,520,800 67,982,123 536,657,602
Treatment&Disposal Proiects
Collections Facilities
Rehabilitate District Siphons By Adding Air Jumper 5,731,000 - 114,700 114,700 5,616,300
Replacement of the Ellis Ave Pump Station 33.837,000 678.122 642,100 1,320,222 32,516,778
Subtotal-Collection Facilities 39,568,000 678,122 756,800 1,434,922 38,133,078
Headworks
PLC Programming and Integration 515,000 44,921 32,000 76,921 438,079
a.d Sunflower Drive Replacement 815,000 660,034 155,000 815,034 (34)
Headworks Rehabilitation/Refurbishment 37,510,000 69,746 1,200 70,946 37,439,054
Headworks Improvements at Plant No.2 226.130,000 9,149,698 6,859,400 16,009,098 210,120,902
Subtotal-Headworks 264,970,000 9,924,399 7,047,600 16,971,999 247,998,001
Primary Treatment
Pri.Clarifiers 16-31 &Related Facilities 88,561,000 43,987,660 21,991,900 65,979,560 22,681,440
Primary Treatment Rehab/Refurb 55,093,000 24,625 517,100 541,725 54,551,275
Circular Clarifier Drive Replacement/Upgrade 3,467,000 304,870 1,823,700 2,128,570 1,338,430
Sludge Density Meter Upgrades 800,000 21,126 400,000 421,126 378,874
Subtotal-Primary Treatment 147,921,000 44,338,281 24,732.700 69,070,981 78,850,019
Secondary Treatment
New Secondary Treatment System at Plant No.1 251,100,000 - 1,403,100 1,403,100 249,696,900
Trickling Filter Rehabilitation and New Clarifiers 46,210,000 4,375,107 10,255,900 14,631,007 31,578,993
i..d Activated Sludge Plant Rehabilitation 23,870,000 15,716 1,801,600 1,817,316 22,052,684
Sec Treat Monitoring&Cntrl Sys Upgrad 8,703,000 569,267 1,456,100 2,025,367 6,677,633
Secondary Plant Rehabilitation 20,474,000 112,812 501,500 614,312 19,859,688
New Trickling Filters 128,727,000 - 739,600 739,600 127,987,400
"e Oxygen Plant ReplacemenURehabilitation Assess 2,145,000 109,901 306,900 416,801 1,728,199
Activated Sludge Aeration Basin Selector Study 945,000 97,459 60,000 157,459 787,541
Computer Modeling of Activated Sludge System 120.000 - 20,000 20,000 100,000
Subtotal-Secondary Treatment 482,294,000 5,280,262 16,544,700 21,824,962 460,469,038
Solids Handling&Digestion
Sludge Digester Rehabilitation at Plant 1 30,223,000 - 232,400 232,400 29,990.600
r.r Sludge Dewatering and Odor control at Plant 1 62,905,000 - 195,200 195,200 62,709,800
Ammonia Side Stream Treatment 18,600,000 - - - 18,600,000
Digesters,Centrifuge/Press&Cake Storage Hopper 61,605,000 - - - 61,605,000
Solids Storage and Truck Loading Facility 14,582,000 13,561,758 710,800 14,272,558 309,442
am (Continued)
Section 3- Page 7
ow
FY 2003-04 Mid-Year Report
Summary of Capital Improvement Construction Requirements-Project Life
For the Six Months Ended December 31,2003
Current Total
Approved June 30,2003 Year Projected Remaining w
Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2004 Budget
(Solids Handling&Digestion continued)
W
Digesters and Sludge Cake Hoppers at Plant 2 42,325,000 1,100 1,100 42.323,900
Digester Rehabilitation at Plant 2 25,621,000 - 142,200 142,200 25,478,800
Sludge Dewatering and Odor Control at Plant 2 79,082,000 - - - 79,082,000
High Rate Digester Mix Pumps Mech.Seals 517,000 507,904 35,100 543,004 (26,004)
Sludge Grinder Replacement 224,000 - 20,000 20,000 204,000
Tule Ranch Maint/Biosolids Management Needs 200,000 - 121,000 121,000 79,000 -
Subtotal-Solids Handling&Digestion 335,884,000 14,069,662 1,457,800 15,527,462 320,356,538
Ocean Outfall Systems
Peak Flow Management 11,257,000 1,026,649 1,060,400 2,087,049 9,169,951
Effluent Pumping Station Annex 50.757,000 4,256,790 2,203,900 6,460,690 44,296,310
Short Term Outfall Bacteria Reduction 7,578,000 4,760,267 3,018,200 7,778,467 (200,467)
NPDES Permit Renewal 1,512,000_ 991,811 114,000 1,105,811 406,189
Subtotal-Ocean Outfall Systems 71,104,000 11,035,517 6,396.500 17,432,017 53,671,983
LJ
Utility Systems
Electrical Power System Single-line Diagrams 3,368,000 286 87,800 88.086 3,279,914 -
Standby Power and Reliability Modifications 17,643,000 13,047,161 2,434,400 15.481,561 2,161,439
Cable Tray Improvements at Plants 1 &2 29,526,000 1,099,287 228,800 1,328,087 28,197.913
Central Generation Automation 8,038,000 627,390 822,300 1,449,690 6,588,310
Area Classification Studies Implementation Plan 21.283,000 338 6,955,900 6,956,238 14,326,762
Plant 1 66kV Substation 4,645,000 - 39,500 39,500 4,605,500
Gas Compressor Addition at Plant No.2 4,326,000 92,792 123,200 215,992 4,110,008
Utilities Rehabilitation and Refurbishment 4,929,000 818,037 339,000 1,157,037 3,771.963
Fuel Station Replacement at Plant No.2 3,231,000 4,411 22,500 26,911 3,204,089
Electrical Equipment Refurbishment and Protection 3,312,000 458 339,800 340,258 2,971,742
Rehabilitation of Low Pressure Gas Holder 422,000 - 50,000 50,000 372,000
Indoor/Outdoor Lighting Study 132,000 - 90,000 90,000 42,000
Plant 1 Plant Water VFD Replacement 2,334,000 - 298,300 298,300 2,035,700
Subtotal-Utility Systems 103,189,000 15,690,160 11,831,500 27,521,660 75,667,340 W
Odor Control Related Projects
Facilities Modifications for Odor Control 4,127,000 644,339 1,922,000 2,566,339 1,560,661
Rehabilitation of Odor Control Facilities 33,224,000 231,664 1,411,000 1,642,664 31,581,336
Subtotal-Odor Control Related Projects 37,351,000 876,003 3,333,000 4,209,003 33,141,997
Plant Automation&Computerization
Power Monitoring and Control Systems 3,790,000 24,177 288,500 312,677 3,477,323
Plant Reinvention/Automation Project 21,915,000 13,536,780 721,200 14,257,980 7.657,020 _
Document Management 864,000 668,668 30,000 698,668 165,332
Data Integration 4,334,000 3,193,482 500,000 3,693,482 640,518
Strategic Information Architecture(SIA) 724,000 440,513 50.000 490,513 233,487
Intemet/Intranet Development 650,000 279,653 235,000 514,653 135,347
CMMS System Replacement 3,789,000 - 200,000 200,000 3,589,000
Source Control Programming 2,956,000 1,357,105 430,000 1,787.105 1.168,895 dal
Geographic Information System 4,157,000 408,397 400,000 808,397 3,348,603
SCADA System Replacement Study 300,000 - 150,000 150,000 150,000 --
SCADA Graphics Tagging Update 425,000 49,169 - 49.169 375,831
Financial Information System Upgrade 3,213,000 1.591,361 880.000 2,471,361 741,639 (Rai
Information Technology Disaster Recovery 332,000 34,075 10,000 44,075 287,925
Network Equipment Upgrade 2,901,000 1,145,146 57,000 1,202,146 1,698,854
Subtotal-Plant Automation&Computerization 50,350,000 22,728,526 3,951,700 26.680,226 23,669,774
Section 3- Page 8
lr�
r
CIP Review
boo Summary of Capital Improvement Construction Requirements -Project Life
For the Six Months Ended December 31,2003
Current Total
"d Approved June 30,2003 Year Projected Remaining
Project Accumulated Projected Cost at Future
Budget Cost Cost June 30,2004 Budget
Process Related Special Projects
Standard Specifications Revisions and Updates 657,000 478,837 8,500 487,337 169,663
Effluent Pathogen Reduction Altematives Plan 1,549,000 - 518,900 518,900 1,030,100
Plant O&M Manual and SOP Project-Phase 1 4,000,000 329,004 450,000 779,004 3,220,996
Hazardous Energy Control Procedures 1,190,000 623.778 250,000 873,778 316,222
Corrosion Management 7,548,000 136,039 75,000 211,039 7,336,961
Special Projects: Anoxic Gas Flotation(AGF) 798,000 524,679 50,000 574,679 223.321
Special Projects: Anaerobic Baffled Reactor(ABR) 514,000 51,878 22,000 73,878 440,122
r Special Projects: Primary Effluent Filtration 470,000 419,428 1,000 420,428 49,572
Special Projects: Oxygen Ionization/Odor Control 210,000 - - - 210.000
Special Projects: Microfiltration/Primary Effluent 4,095,000 2,838,554 290,000 3,128,554 966,446
Special Projects: Dewatering Options Comparison 99,000 - - - 99,000
odd Special Projects: Biotrickling Filter(BTF) 328,000 399,605 161,000 560,606 (232,606)
Special Projects: Ammonia Reduction Options 277,000 - - - 277,000
Subtotal-Process Related Special Projects 21,735.000 5,801,803 1,826,400 7,628,203 14,106,797
Miscellaneous&Support Projects
Facilities Engineering Projects-Joint 18,200,000 254.903 579,000 833,903 17,366,097
Facilities Engineering Projects-Plant 1 18,200,000 242,999 697,700 940,699 17,259,301
.r Facilities Engineering Projects-Plant 2 18.200,000 293,995 730,400 1.024,395 17,175,605
Interim Fac Record&Eng Data Syst Maint Services 628,000 383,568 244,500 628,068 (68)
Supplemental Full Secondary Treatment CEQA Doc 425,000 - 215,100 215,100 209,900
Supplement No.1 to the 1999 Strategic Plan EIR 832,000 316,272 506,800 823,072 8.928
for Long Range Biosolids Management Plan 2,833,000 584,297 905,700 1,489,997 1,343,003
Strategic Plan Update 3,419,000 360,033 712,000 1,072,033 2,346,967
Modifications to Existing Mech Systems 3,007,000 272,215 - 272,215 2,734,785
Building Rehabilitation/Refurbishment 1,455,000 169 282,300 282,469 1,172,531
"'r Space Allocation and Interior Renovation 16,388,000 648.491 325,800 974,291 15,413,709
Laboratory Rehabilitation 1,829,000 - 110,900 110,900 1.718,100
Tenant Improvements to Rebuild Shop 321,000 8,653 59,400 68,053 252,947
and Engineering Trailer Complex 2,006,000 1,978,444 228,900 2,207,344 (201,344)
Support Building Power System Modifications 2,751,000 - 59,200 59,200 2,691,800
Security System Improvements 1,100,000 1,054,414 40,000 1,094,414 5,586
Small Cap.Equip.Replacement Project 3,000,000 1,638,532 500,000 2,138,532 861.468
y,d Asset Management Program 16,555,000 - 100.000 100,000 16,455,000
Warehouse Reinvention Project 600.000 83,290 75,000 158.290 441,710
Plume Modeling 377,000 134,764 90,000 224,764 152,236
Plant 2 Maintenance Building Modifications 300,000 - - 300,000
Subtotal-Miscellaneous&Support Projects 112,426,000 8,255,039 6.462,700 14,717,739 97,708,261
Water Management Projects
Groundwater Replenishment System 236,206,000 15,447,736 17,622,800 33,070,536 203,135,464
Wd Water Conservation 4,644,000 2,886,237 491,900 3,378,137 1,265,863
Co-op Projects,Inflow/Infilt.Reduction 72,000,000 - 402,000 402,000 71,598,000
Long Term Permanent Monitoring Program 2,852,000 4,350,529 324,100 4,674,629 (1,822,629)
Subtotal-Water Management Projects 315,702,000 22,684,502 18,840.800 41,525,302 274,176,698
Additional Charges to CIP Completed at 6/30103 142.178,333 83,124,031 6,607,200 89,731,231 52,447,102
Total Treatment and Disposal Projects 2,124,672,333 244,486,307_ 109,789,400 354,275,707 1,770,396,626
r.r
Capital Equipment Purchases 4,143,600 - 4,143,600 4,143,600 -
Total Collections and Treatment&Disposal
Projects and Capital Equipment Purchases $2.733.455,658 $280,947,630 $145,453,800 $426.401,430 $2,307,054,228
00
Section 3-Page 9
+w
FY 2003-04 Mid-Year Report
6w
This Page Intentionally Left Blank
L
Section 3-Page 10
1.r
� ,
L
Marna?!
�aad anuana�
��
�� �
� �-,
��
� �.
�� �,
�=- �".
�_ �—
Budget Review by Revenue Area
All Revenue Areas Operating and Capital Facilities Budget Review
For the Six Months Ended December 31, 2003
Operating Budget Review
�r 2003-04 Year-To- Remaining Year-To-Date
Budget Date Budget %of Budget
CASH RECEIPTS:
�a
Tax Allocations/Subventions(Share of 1%) $ 41,200,000 $ 24,719,256 $ 16,480,744 60.00%
Other User Fees 99,277,000 53,304,791 45,972,209 53.69%
Connection Fees 9,120,000 3,257,088 5,862,912 35.71%
Sale of Capacity Rights 6,195,000 5,252,015 942,985 84.78%
mob Capital Assessment(IRWD) 2,259,000 1,589,364 669,636 70.36%
Debt Proceeds 280,000,000 280,000,000 - 100.00%
Interest&Miscellaneous Revenue 43,534,000 4,447,846 39,086,154 10.22%
ho
Total Receipts $ 481,585,000 $372,570,360 $109,014,640 77.36%
,o CASH DISBURSEMENTS:
Share of Joint Works Capital Improvements $ 161,184,000 $ 44,134,588 $117,049,412 27.38%
Collection Activity Capital Improvements 38,769,000 11,625,751 27,143,249 29.99%
00 COP Retirement and Interest Expense 36,950,000 21,596,622 15,353,378 58.45%
Share of Joint Works Operating Expenses 77,010,000 40,192,976 36,817,024 52.19%
Revenue Area Operating &Other Expenses 12,500,000 7,929,479 4,570,521 63.44%
ism Total Disbursements $ 326,413,000 $125,479,416 $200,933,584 38.44%
Capital Facilities Budget Review
Balance Adjustments Transfer to Balance
07/01/03 &Additions Fixed Assets 12/31/03
CONSTRUCTION IN PROGRESS:
Collection Activity Construction in Progress $ 33,884,895 $ 11,625,751 $ - $ 45,510,646
..r
Share of Joint Works Treatment Plant CIP 210,329,344 44,134,588 - 254,463,932
Subtotal 244,214,239 55,760,339 - 299,974,578
PROPERTY, PLANT& EQUIPMENT(at cost):
Land and Property Rights 10,398,595 - - 10,398,595
Collection Lines and Pump Stations 396,426,189 - - 396,426,189
�+ Treatment Facilities 650,908,862 - - 650,908,862
Disposal Facilities 90.161,860 - - 90,161,860
General Plant and Administrative Facilities 124,120,780 - - 124,120,780
Subtotal 1,272,016,286 - - 1,272,016,286
r
Total Property, Plant&Equipment&CIP $1,516,230,525 $ 55,760,339 $ - $1,571,990,864
m
Section 4- Page 1
FY 2003-04 Mid-Year Report
Consolidated Revenue Area Operating and Capital Facilities Budget Review 'U'
For the Six Months Ended December 31,2003
Operating Budget Review
2003-04 Year-To- Remaining Year-to-Date
Budget Date Budget %of Budget
CASH RECEIPTS:
Tax Allocations/Subventions (Share of 1%) $ 41,200,000 $ 24,719,256 $ 16,480,744 60.00%
Other User Fees 96,277,000 51,248,253 45,028,747 53.23%
Connection Fees 9,120,000 3,257,088 5,862,912 35.71%
Sale of Capacity Rights 6.004,000 5,252,015 751,985 -
Capital Assessment(IRWD) - - - - �'
Debt Proceeds 280,000,000 280,000,000 - 100.00%
Interest&Miscellaneous Revenue 42,079,000 4,409,256 37,669,744 1d.48%
Total Receipts $ 474,680,000 $368,885,868 $105,794,132 77.71%
CASH DISBURSEMENTS:
Share of Joint Works Capital Improvements $ 154,269,000 $ 42,779,656 $111,489,344 27.73%
Collection Activity Capital Improvements 38,698,000 11,125,818 27,572,182 28.75%
COP Retirement and Interest Expense 36,950,000 21,596,622 15,353,378 58.45%
Share of Joint Works Operating Expenses 74,633,000 38,231,926 36,401,074 51.23%
Revenue Area Operating&Other Expenses 12,193,000 7,754,418 4,438,582 63.60%
Total Disbursements $ 316,743,000 $121,488,440 $195,254,560 38.36% ti
Capital Facilities Budget Review
Balance Adjustments Transfer to Balance
07/01/03 &Additions Fixed Assets 12/31/03
CONSTRUCTION IN PROGRESS:
Collection Activity Construction in Progress $ 33,696,471 $ 11,125,818 $ - $ 44,822,289
Share of Joint Works Treatment Plant CIP 203,872,231 42,779,656 - 246,651,887 W
Subtotal 237,568,702 53,905,474 - 291,474,176
PROPERTY, PLANT& EQUIPMENT(at cost):
Land and Property Rights 9,891,731 - - 9,891,731
Collection Lines and Pump Stations 367,023,515 - - 367,023,515
Treatment Facilities 630,926,572 - - 630,926,572
Disposal Facilities 87,397,008 - - 87,397,008
General Plant and Administrative Facilities 120,330,717 - - 120.330,717
W
Subtotal 1,215,569,543 - - 1,215,569,543
Total Property, Plant& Equipment&CIP $1,453,138,245 $ 53,905,474 $ - $1,507,043,719 �
1W
Section 4- Page 2
,l.r
Budget Review by Revenue Area
Revenue Area No. 14 Operating and Capital Facilities Budget Review
For the Six Months Ended December 31, 2003
Operating Budget Review
2003-04 Year-To- Remaining Year-To-Date
Budget Date Budget %of Budget
CASH RECEIPTS:
Tax Allocations/Subventions(Share of I%) $ - $ - $ - N/A
Other User Fees 3,000,000 2,056,538 943,462 68.55%
Connection Fees - - - N/A
Sale of Capacity Rights 191,000 - 191,000 0.00%
Capital Assessment(IRWD) 2,259,000 1,589,364 669,636 70.36%
Debt Proceeds - - - N/A
Interest&Miscellaneous Revenue 1,455,000 38,590 1,416,410 2.65%
two
Total Receipts $ 6,905.000 $ 3.684,492 $ 3,220,508 53.36%
CASH DISBURSEMENTS:
MW
Share of Joint Works Capital Improvements $ 6,915,000 $ 1,354,932 $ 5,560,068 19.59%
Collection Activity Capital Improvements 71,000 499,933 (428,933) 704,13%
COP Retirement and Interest Expense - - - N/A
Share of Joint Works Operating Expenses 2,377,000 1,961,050 415,950 82.50%
Revenue Area Operating&Other Expenses 307,000 175,061 131,939 57.02%
,.0 Total Disbursements $ 9,670,000 $ 3,990,976 $ 5,679,024 41.27%
,o, Capital Facilities Budget Review
Balance Adjustments Transfer to Balance
07/01/03 &Additions Fixed Assets 12/31/03
VAW CONSTRUCTION IN PROGRESS:
Collection Activity.Construction in Progress $ 188,424 $ 499,933 $ - $ 688,357
Share of Joint Works Treatment Plant CIP 6,457,113 1,354,932 - 7,812,045
Subtotal 6,645,537 1,854,865 - 8,500,402
PROPERTY, PLANT&EQUIPMENT(at cost):
Land and Property Rights 506,864 - - 506,864
Collection Lines and Pump Stations 29,402,674 - - 29,402,674
ua Treatment Facilities 19,982,290 - - 19,982,290
Disposal Facilities 2,764,852 - - 2,764,852
General Plant and Administrative Facilities 3,790,063 - - 3,790,063
"d Subtotal 56,446,743 - - 56,446,743
Total Property, Plant&Equipment&CIP $ 63,092,280 $ 1,854,865 $ - $ 64,947,145
Section 4- Page 3
INWO
FY 2003-04 Mid-Year Report
W
bw
6w
This Page Intentionally Left Blank
W
Li
61
W
lrl
wj
Irl
Section 4- Page 4
moixe l
VMN
Self Insurance Review
General Liability Fund Budget Review
For the Six Months Ended December 31,2003
tow
Percent
Actual of Budget Remaining Actual
2003-04 Through Through 2003-04 Through Increase
Budget 12/31/03 12/31103 Budget 12/31/02 (Decrease)
Revenues:
In-Lieu Premiums $2,200,000 $1,350,000 61.36% $ 850,000 $950,000 $400,000
Interest&Miscellaneous 20,000 810 4.05% 19,190 19,558 (18,748)
Allocation from Other Funds 500,000 6,468 1.29% 493,532 4,322 2,146
Total Revenues 2,720,000 1,357,278 49.90% 1,362,722 973,880 383,398
Expenses:
be Benefits/Claims 300,000 66,298 22.10% 233,702 9,731 56,567
Contractual Services 1,000 600 60.00% 400 300 300
wi Legal Services 325,000 95,524 29.39% 229,476 156,369 (60,845)
Professional Services 5,000 520 10.40% 4,480 1,475 (955)
tow
Service Department Allocation 1,550,000 708,996 45.74% 841,004 778,428 (69,432)
Subtotal 2,181,000 871,938 39.98% 1,309,062 946,303 (74.365)
Insurance premium 190,000 193,230 101.70% (3,230) 94,928 98,302
Total Expenses 2,371,000 1,065,168 44.92% 1,305,832 1,041,231 23,937
Excess Revenue(Expenses) 349,000 292,110 83.70% $ 56,890 (67,351) 359,461
Beginning Reserves 183,800 94,372 301,883 (207,511)
Ending Reserves $ 532,800 $ 386,482 $234,532 $ 151.950
Section 5-Page 1
tnr
FY 2003-04 Mid-Year Report
Workers' Compensation Fund Budget Review lWJ
For the Six Months Ended December 31, 2003
Percent
Actual of Budget Remaining Actual
2003-04 Through Through 2003-04 Through Increase
Budget 12/31/03 12/31/03 Budget 12/31/02 Decrease
Revenues:
t,d
In-Lieu Premiums $1,000.000 $500,000 50.00% $500,000 $250,000 $250,000
Interest& Miscellaneous 7,000 154 2.20% 6,846 3,725 (3,571)
Total Revenues 1,007,000 500,154 49.67% 506,846 253,725 246,429
Expenses:
Benefits/Claims 350,000 183,944 52.56% 166,056 147,963 35,981
i.d
Contractual Services 25,000 12,500 50.00% 12,500 10,417 2,083
Legal Services 25,000 7,155 28.62% 17,845 7,701 (546)
Professional Services 25,000 7,885 31.54% 17,115 7,921 (36)
Service Department Allocations 50,000 7,824 15.65% 42,176 11,928 (4,104)
i.d
Subtotal 475,000 219,308 46.17% 255,692 185,930 33,378
Insurance premium 105,000 81,194 77.33% 23,806 35,352 45,842 6mJ
Total Expenses 580,000 300,502 51.81% 279,498 221,282 79,220
Excess Revenue(Expenses) 427,000 199,652 46.76% $227,348 32,443 167,209 LEE,
Beginning Reserves 22,900 (32,841) (79,645) 46,804
Ending Reserves $ 449.900 $166,811 $ (47,202) $214,013
rrd
iW
Section 5- Page 2
ORANGE COUNTY SANITATION DISTRICT
(714) 962-2411
www.ocsd.com
Mailing Address:
P.O. Box 8127
Fountain Valley, California
92728-8127
Street Address:
10844 Ellis Avenue
Fountain Valley, California
92708-7018
OCSD 12/31/03