HomeMy WebLinkAbout1999-09-22 `" ORANGE COUNTY SANITATION DISTRICT
September 15, 1999
peen
(7143 982-2411
.Ill.,add,...: NOTICE OF MEETING
RO.Box 8127
Flaunted Valley,CA
9272E-8127 BOARD OF DIRECTORS
streee.ddr.u: ORANGE COUNTY SANITATION DISTRICT
1
0
B44 Ellie Avenue
Foan ain92 Valley,CA WEDNESDAY, September 22, 1999 — 7:00 P.M.
DISTRICT'S ADMINISTRATIVE OFFICES
10844 Ellis Avenue
Meember Agencies Fountain Valley, California 92708
foli
•
titles
Anaheim
Bray, The Regular Meeting of the Board of Directors of the Orange County Sanitation
Buena Perk Cypress District will be held at the above location, time and date.
Fountain Valley
Fullerton
Garden Grove
Huntington Beech
Irvine Le g d Secr
is Anent
Loa Alamitos
Newport Beech
O
Placentiae.c.
Santa Ana Tentatively - Scheduled UDcomina Meetings
Seat Beach
Stanton
moan
vole Park JOINT GROUNDWATER REPLENISHMENT
Verb. Linde SYSTEM COOPERATIVE COMMITTEE - Tuesday, September 28, 1999 at 5:30 p.m.
county of orange @OCWD
units" Districts STEERING COMMITTEE - Wednesday, September 22, 1999 at 5:00 p.m.
costa Mesa OMTS COMMITTEE - Wednesday, October 6, 1999 at 5:00 m.
Midway city P
Water Districts PDC COMMITTEE - Thursday, October 7, 1999 at 5:00 p.m.
Irvine Ranch
FAHR COMMITTEE - Wednesday, October 13, 1999 at 5:00 p.m.
JOINT GROUNDWATER REPLENISHMENT
SYSTEM COOPERATIVE COMMITTEE - Tuesday, October 26, 1999 at 5:30 p.m.
@OCWD
STEERING COMMITTEE - Wednesday, October 27, 1999 at 5:00 p.m.
"To Protect the Public Health and the Envmnment through Excellence in Westawater Systems"
,�eo
BOARD MEETING DATES
Month Board Meeting
September September 22, 1999
October October 27, 1999
November 'November 17, 1999
December `December 15, 1999
January January 26, 2000
February February 23, 2000
March March 22, 2000
April April 26, 2000
May May 24, 2000
June June 28, 2000
July 'July 19, 2000
August August 23, 2000
September September 27, 2000
'Meetings are being held on the third Wednesday of the month
Hlwpdt dmin%BSNgenda%1999 Me NNdic WN9.2.dm
AGENDA
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
DISTRICT'S ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
SEPTEMBER 22, 1999 -7:00 P.M.
In accordance with the requirements of California Government Code Section 54954.2, this
agenda has been posted in the main lobby of the District's Administrative Offices not less
than 72 hours prior to the meeting date and time above. All written materials relating to each
agenda item are available for public inspection in the office of the Board Secretary.
In the event any matter not listed on this agenda is proposed to be submitted to the Board for
discussion and/or action, it will be done in compliance with Section 54954.2(b) as an
emergency item, or that there is a need to take immediate action which need came to the
attention of the District subsequent to the posting of the agenda, or as set forth on a
supplemental agenda posted not less than 72 hours prior to the meeting date.
1. Invocation and Pledge of Allegiance
2. Roll Call
3. Consideration of motion to receive and file minute excerpts of member agencies
relating to appointment of Directors, if any. (See listing in Board Meeting folders)
4. Appointment of Chair pro tem, if necessary
5. Public Comments: All persons wishing to address the Board on specific agenda items
or matters of general interest should do so at this time. As determined by the Chair,
speakers may be deferred until the specific item is taken for discussion and remarks
may be limited to five minutes.
Matters of interest addressed by a member of the public and not listed on this agenda
cannot have action taken by the Board of Directors except as authorized by Section
54954.2(b).
09/22/99
Page 2
w
6. The Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors.
a. Report of Chair, consideration of resolutions or commendations,
presentations and awards
b. Report of General Manager
C. Report of General Counsel
7. If no corrections or amendments are made, the minutes for the meeting held on
August 25, 1999 will be deemed approved as mailed and be so ordered by the Chair.
8. Ratifying payment of claims of the District, by roll call vote, as follows:
ALL DISTRICTS 08/15/99 08/31/99
Totals $9,249.062.41 $4.596,896.84
CONSENT CALENDAR
All matters placed on the Consent Calendar are considered as not requiring discussion or
further explanation and unless any particular item is requested to be removed from the
Consent Calendar by a Director, staff member or member of the public in attendance, there
will be no separate discussion of these items. All items on the Consent Calendar will be
enacted by one action approving all motions, and casting a unanimous ballot for resolutions
included on the consent calendar. All items removed from the Consent Calendar shall be
considered in the regular order of business.
Members of the public who wish to remove an item from the Consent Calendar shall, upon
recognition by the Chair, state their name, address and designate by number the item to be
removed from the Consent Calendar.
The Chair will determine if any items are to be deleted from the Consent Calendar.
9. Consideration of motion to approve all agenda items appearing on the Consent
Calendar not specifically removed from same, as follows:
END OF CONSENT CALENDAR
10. Consideration of items deleted from Consent Calendar, if any.
09/22/99
Page 3
NON-CONSENT CALENDAR
11. a. Verbal report by Chair of Steering Committee re September 22, 1999 meeting.
b. DRAFT COMBINED STEERING AND AD HOC COMMITTEE MINUTES— NO
ACTION REQUIRED (Information only): The Chair will order the draft Steering
Committee Minutes for the special meeting held on August 19, 1999 and the
Combined Steering and Ad Hoc Committee Minutes for the meeting held on
August 25, 1999 to be filed.
12. a. Verbal report by Chair of Operations, Maintenance and Technical Services
Committee re September 1, 1999 meeting.
b. DRAFT OPERATIONS, MAINTENANCE AND TECHNICAL SERVICES
COMMITTEE MINUTES—NO ACTION REQUIRED (Information only): The
Chair will order the draft Operations, Maintenance and Technical Services
Committee Minutes for the meeting held on September 1, 1999 to be filed.
C. Authorize the General Manager to enter into an agreement with the Municipal
Water District of Orange County (MWDOC) for a multi-agency Water Use
Efficiency Program for an amount not to exceed $825,000 for each of the next
five years.
d. Adopt Resolution No. OCSD 99-16, Supporting the Best Management Practices
for Water Conservation.
e. 1) Approve a budget amendment of$139,000 for Parametric Emission
Monitoring System for eight Central Generation System engines, increasing the
total project cost not to exceed $703,200; and 2)Approve Amendment No. 3 to
the Professional Services Agreement with Advanced Engine Technology
Corporation (AETC), providing for additional engineering services to design,
install and certify a Parametric Emission Monitoring system for eight Central
Generation System engines, for an additional amount of$62,500, increasing the
total amount not to exceed $404,500.
f. Approve a Professional Services Agreement with Cyclus Envirosystems, Inc.,
for an Anoxic Gas Flotation Process Demonstration, including the design and
construction of a test facility and ongoing support for a one-year test, for an
amount not to exceed $318,000, and an additional contingency of$32,000.
13. a. Verbal report by Chair of Planning, Design, and Construction Committee re
September 2, 1999 meeting.
b. DRAFT PLANNING, DESIGN, AND CONSTRUCTION COMMITTEE MINUTES -
NO ACTION REQUIRED (Information only): The Chair will order the draft
Planning, Design, and Construction Committee Minutes for the meeting held on
September 2, 1999 to be filed.
09/22/99
Page 4
C. (1) Ratify Change Order 4 to Orange Park Acres Trunk Replacement, Contract
No. 7-17, with Fleming Engineering, Inc., authorizing a credit of$38,134,
decreasing the total contract amount to $1,423,631; and (2) accept Orange Park
Acres Trunk Replacement, Contract No. 7-17, as complete, authorizing
execution of the Notice of Completion and approving the Final Closeout
Agreement with Fleming Engineering, Inc.
d. 1) Ratify Change Order 2 to Fire Alarm and Security System Upgrades, Job
No. J-57, with First Fire Systems, Inc., authorizing a credit of$3,260 and a time
extension of 79 calendar days, decreasing the total contract amount to
$357,450.49; and (2) accept Fire Alarm and Security System Upgrades, Job
No. J-57, as complete, authorizing execution of the Notice of Completion and
approving the Final Closeout Agreement.
e. (1)Approve a budget increase of$42,196 to Improvements to Miller-Holder
Trunk Sewer System, Reach 3, Contract No. 3-38-3, for a total revised project
budget of$6,386,196, and (2) ratify Change Order 8 to Improvements to Miller-
Holder Trunk Sewer, Reach 3, Contract No. 3-38-3, with Mladen Buntich
Construction Company, authorizing an addition of$35,191 and 26 calendar
days, increasing the contract amount to$5,269,546.
f. (1) Approve Addendum 5 to the Professional Services Agreement with Boyle
Engineering Corporation for Improvements to Main Street Pump Station,
Contract No. 7-7-1, providing for additional construction support services, for an
additional amount of$27,687, increasing the total contract amount to not to
exceed $515,632; and (2) and approve a budget amendment of$27,687,
increasing the total project budget to $5,259,687.
g. Approve Addendum 2 to the Professional Services Agreement with Carollo
Engineers, P.C., for Electrical Power System Studies, Job No. J-25-4, providing
for additional engineering services, for an additional amount of$91,848,
increasing the total amount not to exceed $2,077,376.
14. a. Verbal report by Chair of Finance, Administration, and Human Resources
Committee re September 8, 1999 meeting.
b. DRAFT FINANCE, ADMINISTRATION, AND HUMAN RESOURCES
COMMITTEE MINUTES— NO ACTION REQUIRED (Information only): The
Chair will order the draft Finance, Administration, and Human Resources
Committee Minutes for the meeting held on September 8, 1999 to be filed.
C. Receive and file Treasurer's Report for the month of August 1999.
d. Receive and file Quarterly Investment Management Program Report for the
period April 1, 1999 through June 30, 1999.
e. Accept Purchase of New Financial Information System (Specification No. P-172)
as complete.
f. Adopt Resolution No. OCSD 99-17, Amending District's Executive Money
Purchase Pension Plan and Trust.
09/22/99
Page 5
,r
g. Approve a Professional Services Agreement with Gerald Jones for services re
Reinvention Automation Project(Job No. J42) in the amount of$67.50 per hour
plus actual travel expenses for a two-year period, in an amount not to exceed
$123,500 per year.
h. Consideration of request by Director Gullixson to have staff, General Counsel
and the FAHR Committee reevaluate and conduct further studies relating to
granting refunds to Yorba Linda (and other areas) property owners of sewer
service charges paid by property owners for parcels not connected to the
District's system.
15. a. Verbal report by Vice Chair of Joint Groundwater Replenishment System
Cooperative Committee re August 24, 1999 meeting.
b. DRAFT JOINT GROUNDWATER REPLENISHMENT SYSTEM COOPERATIVE
COMMITTEE MINUTES— NO ACTION REQUIRED (Information only): The
Chair will order the draft Joint Groundwater Replenishment system Cooperative
Committee Minutes for the meeting held on August 24, 1999 to be filed.
16. Authorize Environmental Science Associates to prepare and circulate the Final
Program Environmental Impact Report for the Strategic Plan in compliance with CEQA
requirements.
17. (1)Approve plans and specifications for High Pressure Compressed Air Systems at
Plant No. 2, Job No. P2-61; (2) Receive and file bid tabulation and recommendation;
and (3) Award a contract to R. Fox Construction, Inc. for High Pressure Compressed Air
Systems at Plant No. 2, Job No. P2-61, for an amount not to exceed $201,700.
18. Ratify use of General Manager's Emergency Purchasing Authority, Resolution
No. OCSD 98-21, for purchase orders issued in connection with the Huntington Beach
closure for Investigation of Coast Trunk Siphon (Specification No. P-188), in an amount
not to exceed $455,000.
19.
CLOSED SESSION: During the course of conducting the business set forth on this
agenda as a regular meeting of the Board, the Chair may convene the Board in
closed session to consider matters of pending real estate negotiations, pending or
potential litigation, or personnel matters, pursuant to Government Code Sections
54956.8. 54956.9. 54957 or 54957.6, as noted.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Board during a permitted dosed
session and are not available for public inspection. At such time as the Board
takes final action on any of these subjects, the minutes will reflect all required
disclosures of information.
a. Convene in closed session, if necessary
09/22/99
Page 6
1. Based on existing facts and circumstances, the Board is deciding
whether to initiate litigation concerning regulation of biosolids
(Government Code Section 54956.9(c).
2. Confer with General Counsel re Orange County Bankruptcy litigation—
County of Orange v. Merrill Lynch, et al. (Government Code Section
54956.9).
3. Confer with General Counsel re Claim of Crow Winthrop Development
Limited Partnership (Government Code Section 54956.9(b)(3)(c)).
b. Reconvene in regular session
C. Consideration of action, if any, on matters considered in closed session
20. Matters which a Director would like staff to report on at a subsequent meeting
21. Matters which a Director may wish to place on a future agenda for action and
staff report
22. Other business and communications or supplemental agenda items, if any
23. Adjournments
NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the
Board of Directors shall submit items to the Board Secretary no later than the close of
business 14 days preceding the Board meeting. The Board Secretary shall include on the
agenda all items submitted by Directors, the General Manager and General Counsel and all
formal communications.
Board Secretary: Penny Kyle (714) 593-7130 or
(714) 962-2411, ext. 7130
H.Wp.dla�gerMa rd Ager sal gag Beard AWe s`ag22gg.dm
ROLL CALL
BOARD OF DIRECTORS
ORANGE COUNTY SANITATION DISTRICT
MEETING DATE: September 22, 1999 TIME: 7:00 P.M.
(SIMONIAN) .................... ANDERSON.............
......� ✓ —
(FLORY) .......................... BANKHEAD.................... �L —
(SNOW) ........................... BOYD............................
� —
(COOK) ............................ COLLINS.................... ..
(MOORE) ......................... DAUCHER.....................
i —
(THOMSON) .................... DEBAY..........................
�_ �L —
(DOTSON) ....................... DONAHUE..................... ✓ _,L —
(UNDERHILL)................... ECKENRODE................. Ll —
(PERRY)........................... FERRYMAN....................
`/ —
(GAROFALO)................... GREEN.........................
—✓ _L —
(WISNER)......................... GULLIXSON..................... —
(BROADWATER) ............. LEYES.......................... ✓ _
(MARSHALL).................... MAULLER..................... —
(DALY).............................. MC CRACKEN...............
(LUTZ).............................. MC GUIGAN.................. ✓
(SPURGEON)................... MURPHY......................
(EVANS)........................... NEUGEBAUER.............. .
(FRESCHI)....................... PATTERSON................. CL
(KEENAN) ........................ PIERCY........................ —
(POTTS)........................... SALTARELLI..................
— i —
(SMITH, GREG) ............... SHEA........................... .
(SMITH, CHUCK)............. SILVA........................... ✓ —
(MILLER).......................... SWAN........................... —
(BATES) ........................... SYLVIA......................... _
(BLAKE)............................ WALKER....................... —
STAFF: tto
Anderson ✓ `/,,
Ghirelli
Hod es (zQ Tgrtla
J.udwiFr- ✓ Vim"`''
McIntyre /
Miles
Ooten
Peterman
Streed
Tuchman ✓
OTHERS:
Woodruff
Andrus
�„y�/(
03/24/99
N:1wp.tlla�atlmin�BSIDIRECTORIOlredan:Rao Gall.tloc
SIGN-IN SHEET
ORANGE COUNTY SANITATION DISTRICT
BOARD MEETING
NAME ORGANIZATION/FIRM
leaseprint) leaseprint)
3e, n u Cj F
Yf wood5l - cost, AeSA SRh blS'R'ICT
HAWRDTAUWINSSV-0RMSlM-INFO M.DOC
� e,
�!'fi to 9.ea/97
COMMISSION ON
BUILDING FOR THE
21 ST CENTURY
INTERIM REPORT
TO THE GOVERNOR
AUGUST 2, 1999
SEP� OF TN
EUI1Ek� lC
W
= O
r D
Cq LIFORO'
STATE OF CALIFORNIA—BUSINESS.TRANSPORTATION AND HOUSING AGENCY GRAY DAVIS.Ge.e
BUSINESS, TRANSPORTATION AND HOUSING AGENCY
990 9'Street,Suite 2450
Saaamenta,CA 95614-2719
(916)323-5400
FAX(916)323.5400
August 2, 1999
Dear Governor Davis:
It is with great pleasure that we submit to you the interim findings and recommendations of the Commission
on Building for the 21st Century. While this is an interim report,we believe that it represents a balanced and
cohesive approach to the challenge of investing in the infrastructure of California for the new millennium.
Our goal is to inform you with these interim findings and recommendations as you begin your dialogue with
the Legislature on immediate bond and financing priorities. Formulated and developed by each committee
after considerable fact-finding and deliberation, this report has been approved and endorsed by the entire
Commission.
The Commission adhered to your direction given at the outset of this process to preserve California's quality
of life, maintain its economic prosperity, and live within our means. Moreover, we believe this report is
consistent with your vision that all Californians share in the prosperous future that a strong infrastructure
and public investment program will provide.
Through these investments and strategies, we will:
• increase the availability and affordability of housing,so that our citizens can afford to live within reasonable
distance of their place of employment;
• increase mobility and reduce congestion for commuters, through enhanced travel options in heavily
traveled corridors;
• sustain the high quality and reliability of our water supply for the state's residents, industries, and
agriculture;
• preserve our urban heritage park lands and recreational areas,so that Californian's can enjoy their beauty
and seek refuge from the urban environment; and
• embark on providing universal access to information technology for the youth of our state who embody
our future.
This Commission recognizes that these investments and strategies are not a panacea. It will take a sustained
financial commitment to reverse the effects of the past inaction. We recognize that this is a complex and
challenging undertaking. We applaud your courage and foresight in initiating programs that will benefit
generations to come. We will continue this important work with the Commission to develop a long-range
vision consistent with our May 1999 report. We will also continue to report our progress to you and complete
a final report recommendations by December 2000,
MARIA CONTRERAS-S ET,SecretaryUFRUZ M.BUSTAMANTE
Business,Transportation and Lieutenant Governor
Housing Agency
FACILITIES COMMITTEE FINDINGS AND RECOMMENDATIONS
The Facilities Committee has analyzed infrastructure needs in a multitude of areas
including coups,hospitals,museums,prisons,veteranti homes,housing,schools,and
universities,and reviewed such issues as public building safety and retrofit,and public
building capacity. In general, this committee notes the past fifteen years of under-
investment in these critical components of Califomia s infrastructure. The Committee
also considered the fact that educational facilities received substantial funding with
approval of a$9.2 billion bond in November 1998 and that your recent initiative for a
new prison was approved by the Legislature. Consequently, the committee did not
consider these facilities for a year 20W state bond(although these facilities needs should
be considered high priorities in the future). Based on the evidence of significant needs
in particular areas,the committee makes the following recommendations:
FINDING/RECOMMENDATION I
Ensuring Housing Availability for All Californians
Housing comprises an integral pan of economic development. High housing costs and
the unavailability of housing constitute one of the biggest obstacles for California
businesses,schools and government in recruiting the qualified,high caliber employees
they need. California faces one of the highest housing costs in the nation. Eleven out of
25 cities with the highest cost-of-living in the nation are in this state. Because of these
high costs,working Californians find themselves increasingly unable to afford a home
and home ownership in California has now dropped to the second lowest level in the
nation. Not only does a housing affordability gap exist,so does a rent affordability gap.
California has fallen behind in supplying adequate and affordable housing to meet its
citizens'needs.
Finance mechanisms that provide housing forCalifomia's families are key to maintaining
the State's economic prosperity and quality of life. Thus,this committee recommends
at least a$750 million to$1 billion General Obligation housing bond proposal be placed
on the year 2000 ballot. The committee believes the use of General Obligation bonds
are an appropriate option to enable California to provide loans to first time homebuyers
and assistance for teachers, firefighters, and police, so they can afford to live in the
communities they serve. The uses of such General Obligation bonds are also appropriate
to fund senior housing,seasonal worker housing and housing to lift the homeless into
safe and secure surroundings. Together,these actions would also enhance the private
sector's ability to build sufficient housing for California's future workers. Other funding
methods,such as public/private partnerships and tax incentives,should also be used to
increase housing resources.
FINDING/RECOMMENDATION 2
Facility Maintenance,Rehabilitation and Retrofitting
Californians are entitled to live in, work in and visit safe buildings, yet funding for
building maintenance,rehabilitation and retrofitting has been severely reduced in the
past two decades. Existing buildings should be well maintained to preserve the State's
earlier capital investments, and should be upgraded to meet the challenges of crime
prevention and natural disasters, to ensure safety and capacity. It will take major
investments to address these needs. Federal, state and local resources provided by
previous legislation will soon be exhausted. Many of these funds come from local tax
revenue and bond proceeds. Governor Davis has responded by addressing the substantial
deferred maintenance backlog through the budget proms.
FINDING/RECOMMENDATION 3
Hospital Needs
California should provide quality medical facilities and essential services for its citizens.
Many hospitals in California have aged considerably and need to be rehabilitated.
seismically retrofitted or replaced. After the Northridge Earthquake, SB 1953 was
enacted requiring hospitals to submit retrofit evaluations to the state by 2001. Many
nonprofit hospitals may not be able to afford retrofitting. Unless adequate funds are
made available, California hospitals may not be able to do the rehabilitation or
replacement required so that important medical services can continue to be provided
for their communities. The first phase of hospital retrofit is due as of 2008 and is
estimated to cost $10 billion, though better cost estimates should be available when
evaluations are submitted in 2001. The committee is deferring its recommendations
until this data is available. A variety of funding mechanisms should be explored to
meet retrofit and replacement costs to ensure that no community is left without needed
hospital care.
FINDING/RECOMMENDATION 4
Establishment of Criteria for Bond Priorities
The committee will be studying and analyzing appropriate criteria and the context for
assessing other key and critical California infrastructure needs through the fall and
winter. Public facilities should be considered for bond financing in light of the State's
overall infrastructure needs. A portion of bond proceeds could also be dedicated to
increase public/private sector partnerships in meeting public infrastructure needs. In
considering proposals for a year 2000 bond,the various types of public facilities were
evaluated using the following criteria: 1)convincing evidence of current need;2)effect
on public health and safety; 3)economic impact:4)impact on Californian's quality of
life;5)availability of other funding sources;and 6)appropriateness of bond financing.
FINDING/RECOMMENDATION 5
Planning
In its work over the last several months, the committee has come to appreciate the
complexity of attempting to evaluate,compare,and prioritize the wide variety of state
and local facility needs. Though the committee received valuable information from a
variety of experts and interested parties, it is apparent that the State would benefit if
decision-makers had a comprehensive inventory of its facilities needs and options for
financing those needs. The State should develop a long-range capital plan that identifies
its infrastructure needs, establishes priorities, and presents funding mechanisms to
implement the plan.
NATURAL RESOURCES COMMITTEE FINDINGS AND
RECOMMENDATIONS
Preservation and enhancement of California's natural resources are vital to maintaining
a quality of life that will continue to attract industries and businesses to California. The
information received to date is sufficient to make the following recommendations as
immediate bonding priorities. These findings and recommendations presented below
represent just a beginning for a comprehensive program to be developed over the next
sixteen months.
Recognizing there are other bond needs destined for the 2IXX1 ballot,we recommend S3
billion be allocated for resources, including water,parks,and open space.
FINDING/RECOMMENDATION 1
State Water and Environmental Needs
An abundant supply of high quality water is the lifeblood of California,is crucial for all
future conservation efforts, and there are many issues associated with ensuring its
continuance. The State relies heavily on the San Francisco Bay/Delta water projects to
supply the needs of its cities and farmland. Ecological issues associated with the Delta
water system, including fisheries protection and salt water intrusion must be addressed
with solutions that provide both flexibility and greatest economic return for the
investment. Watersheds have to be protected to allow natural cleansing processes to
occur and for wildlife habitat. Ensuring the safety and reliability of California's water
supply also presents a pressing problem. Wastewater needs to be treated before it is
released into the environment or before it can be recycled to reduce demand for pristine
supplies.Older solid waste disposal sires pose environmental hazards as toxic chemicals
seep into groundwater. Underground storage tanks must be leak proof to protect local
aquifers. The state will have to address all these needs and many other water and resource
issues to ensure an adequate supply of quality water in the next century.
Other environmental priorities include cleaning up the toxic waste left over from past
practices and in improving air quality. Urban areas,trying to attract inftll development
must contend with remediating brownfield sites that are the legacy of past industrial usage.
The majority of the State's population resides in air basins that are in non-attainment
status for federal and state air quality standards. These needs could have serious
consequences for the health of California's citizens unless they are addressed soon.
The Department of Water Resources, State Water Resource Control Board, California
Environmental Protection Agency and CALFED estimate that short term needs to address
these issues totals approximately S8.0 billion. Federal funding comprises one of the critical
keys to helping narrow the gap between these needs and available funds. However,this
funding must be matched with State and local resources. Of the $8.0 billion in needs,
federal and local sources can supply approximately $2.7 and $1.3 billion respectively.
Pay-as-you-go sources and already approved bond measures,including Proposition 204
funds,provide approximately$1.2 billion more. The State Infrastructure Bank and the
Governor's enhanced commitment to torrent budget funding are available to localities to
meet some of this water infrastructure need. We also must recognize that other methods
of financing are available and need to be evaluated and,where appropriate,implemented
if the State's water needs are to be met. This committee recommends that the Governor
consider advancing a water bond up to $2 billion to address these critical water
development,water reliability and water quality needs.
FINDING/RECOMMENDATION 2
State Natural Resource Needs
California's enhanced quality of life depends on the condition and accessibility of its
parks, open spaces, and natural resources. The quality and availability of these
resources are a major pan of the decision making process for industries seeking to
relocate. After over a decade of neglect and disrepair we must set as one of our
highest priorities the rebuilding and expansion of precious resources and the reversal
of the decline of California's quality of life. Quality parks and natural resources are
lubricants for the State's economic engine because of their ability to attract tourism
and new businesses. It is important to maintain and expand our state park system and
local park and recreation facilities. Urban parks are also important to enhance our
cities. The State's conservancies provide an invaluable service in preserving open
space in areas impacted by development such as in the Coachella Valley,Santa Monica
Mountains,San Joaquin Valley,and Lake Tahoe. The Coastal Conservancy has been
instrumental in preserving public access to the State's beaches. In addition to providing
view-sheds and public access, these conservancies also preserve habitat and
ecosystems.
More than 12 years have passed since parks and open space preservation have been
supported through a State bond. As a consequence, the State Departments of parks
and Recreation, Fish and Game, Forestry and Fire Protection, Conservation, and
Boating and Waterways, in addition to the State Conservancies and the California
Conservation Corp,have been hard pressed to keep abreast with the consequences of
population growth, increased demand for services and urban encroachment.
Responding to the State's natural resources needs is estimated to cost approximately
$5.6 billion. Some of this need can certainly be met through federal,local,or pay-as-
you-go sources of funds,as well as the generous support from land trusts and other
private sources. There are three competing measures in the Legislature,Assembly
Bill 18,Senate Bill 2,and Senate Bill 57:that propose to fund various components of
the shortfall. To respond to this shortfall,this committee recommends a bond proposal
of up to$2 billion to be placed on the year 2000 ballot.
In conclusion,this committee recommends a combined amount of up to$3 billion in
bonding priorities to reverse the decline in Califomia's quality of life. However,this
committee must also note that providing this amount of funding does not cure the
State's environmental problems. It is not possible to do so even within a single decade.
Developing and funding the solutions must be pan of a long-term plan that provides
a reliable and continuous source of funding which can be programmed towards
identified needs,including ongoing funding for operations and maintenance of existing
facilities and deferred maintenance. This committee will continue to define and scope
the parameters of such a plan as pan of its mission.
TECHNOLOGY COMMITTEE FINDING AND RECOMMENDATION
Keeping current with technological innovation is the key to ensuring a high standard of
quality of life for Californians by remaining economically competitive. The State must
take active steps to prevent the creation of a "digital divide" between its citizens by
ensuring that all Californians have universal access to the benefits of the technological
revolution. The process of developing those steps creates many opportunities for the
State. In exploring these opportunities, the members of this committee have heard
testimony from educators and information technology expens on the subjects of using
technology to improve education and rural medical care, relieving transponation
congestion,and bringing government services closer to the public. This committee has
also heard presentations from financial advisors, industry leaders, and legislators on
innovative financing techniques, creating incentives to stimulate telecommunications
industry investment within the state, and current legislative initiatives.The larger task
of defining how these opportunities can be realized still remains before this committee.
The following findings and recommendations are an initial step towards achieving that
goal.
FINDING/RECOMMENDATION
Technology and Educational Infrastructure- Wiring the Schools
The Technology Committee is exploring the development of goats and criteria towards
a common approach to accomplish universal access to information technology by the
educational community. This initiative has multiple dimensions as follows:Hardware
/Conductivity, Training, Systems Support, Learning Environment, Professional
Development, Evaluation, and Partnerships. The task of defining these dimensions
requires industry,communities and the State to consider human resource,application,
hardware,and software issues.
Fortunately,various levels of government and the private sector have shown leadership
in working towards these goals.Nationally,the Federal E-Rate program offers financial
assistance for limited types of technological infrastructure. The State has moved forward
in these areas through programs such as the Digital High School Program,which provides
funding and technical assistance for bringing high schools into the information age and
through Proposition I A funding. At the local level,Orange County uses video technology
to develop educational skills for teachers and staff. Mendocino County has developed
a comprehensive program that integrates technology directly into the civic and leaming
environment. Private industry has contributed by providing hardware, software,and
training at reduced or no cost through charitable programs.
These efforts and programs,though valuable and pioneering,must be integrated into a
comprehensive strategy to be effective. This strategy must ensure that all of the State's
students,regardless of location or economic status,have access to technological benefits
so that they are universally prepared for the challenges of the next century. Defining
this strategy is the primary focus of this committee. It will accomplish this task through
a three-part process as follows:
I.) Surveying educational institutions, the private sector, and other organizations to
determine where gaps exist in coordination and integration in the dimensions
described above.
2.) Developing criteria,goals,and objectives that will guide the State and educational
institutions in developing standards for universal technological access by the
educational community.
3.) Recommending a financial strategy that will contain elements that maximize use of
public and private funds and take advantage of innovative financing techniques.
Although this committee will maintain a primary focus on technological innovation in
educational infrastructure, it will continue to examine opportunities to realize similar
gains for California in increasing access to governmental services and fostering electronic
commerce. This committee will continue to define opportunities for innovation and,
where possible,seek to make recommendations for their implementation. However,it
must also be recognized that the process is a much larger undertaking that will involve
a dialogue among all levels of government, industry, and the State c citizens. That
dialogue cannot begin soon enough.
TRANSPORTATION COMMITTEE FINDINGS
AND RECOMMENDATIONS
An efficient multimodal transportation system is integral to California as we move into
the next century. Building upon the Governor's leadership in the budget response to
transportation needs and in responding to his priorities of reducing congestion,shortening
commute times for our citizens and increasing our productivity,the following interim
recommendations will accelerate progress towards a 21 st century transportation system.
These recommendations will improve the quality of life for California's families. While
the current transportation environment is fraught with deficiencies, we believe great
strides can be made to provide all of our citizens with equitable access and viable
alternatives forcommuting and traveling throughout the State. The findings below will
also be used as a framework by this committee to analyze transportation issues and
alternative solutions,as it develops a course of action that will provide congestion relief,
sustain economic growth,and improve the quality of life in California.
FINDING/RECOMMENDATION I
Transportation System Needs
Senate Resolution 8,prepared by the California Transportation Commission,identified
significant transportation system needs over the next ten years. These needs exist on
our streets and roads,state highways,and public transit systems. In addition,the response
to SR 8 demonstrated the near term need for strategic investment in goods movement,
including enhanced seaport and airport access,and border infrastructure improvements.
The needs include maintenance, rehabilitation,and capital expansion to meet existing
and future demand. It is unclear at this time how many of these needs can be addressed
through conventional and innovative transportation funding techniques. However,it is
clear that a bond measure for these purposes may be an appropriate priority in the
future.
FINDING/RECOMMENDATION 2
Rail and Ferries
The State of California has invested a significant amount of capital funds over the last
15 years to construct and improve upon a well-designed passenger rail system. As the
population continues to increase and the State's economy continues to grow,the State
must continue to invest in the existing rail system to stem and actually reduce the growing
congestion. In the San Francisco Bay area,ferries are an emerging and valuable strategy
for reducing congestion on bridges. This committee recommends that a bond measure
of$500 million to $1 billion be placed on the 2000 ballot to support a program of
increased investment in capital projects that will improve California's passenger rail
and ferry systems and help relieve congestion in well-traveled commuter corridors.
The program should invest in projects that increase capacity and streamline operations
on existing commuter corridors and that provide additional equipment to meet the needs
of expanded capacity. The result of such an investment could increase rail and ferry
service frequencies and reliability,reduce commute trip times,and improve safety and
service quality for commuters.
FINDING/RECOMMENDATION 3
Local Transportation Finance
Local transportation sales taxes are a significant flexible source of funding that should
be preserved. Eighteen counties have enacted local sales taxes for transportation that
have contributed over$30 billion in revenues for projects and programs. However, 16
of these counties will lose this valuable funding tool as their authorizing measures expire
over the next 10 years. Given current state constitutional requirements mandating a
supermajority vote to replace these taxes, it is unlikely that they will be renewed. We
recommend that the Legislature approve a measure to accomplish the goal outlined in
this recommendation for submission to the voters in the year 2((R).
FINDING/RECOMMENDATION 4
Project Priorities
California is faced with many conflicting transportation priorities that compete for scarce
transportation funds. To maximize the return on our investment,in terms of mobility,
economic,and environmental benefits,a uniform process for determining critical projects
should be developed that is performance based. The act of determining such a system,
including categories of measurement and appropriate performance indicators,will be a
lengthy process and require input from all key transportation stakeholders. This
committee believes this will require additional discussion before a final recommendation
can be made.
FINDING/RECOMMENDATION 5
Federal Innovative Financing Techniques
Grant Anticipation Revenue Vehicle Bonds(GARVEEs)provide a useful tool whereby
the State can accelerate projects that have significant potential for a high return on
investment. However,GARVEEs involve a Lade-off between increased cost for debt
service,cost savings for inflation,and economic benefits of early project development.
Given the current balances in the State Highway Account,the ability to use incremental
advance construction funding techniques, and current high availability of federal
obligation authority, this technique may not be required at this time. However, to
maximize State flexibility to respond to changing conditions,the state should have the
authority to issue such bonds to finance worthy projects. Any GARVEE authorization
for project funding, should protect individual county shares,require a comprehensive
cost benefit analysis,and protect the credit worthiness of the State.
FINDING/RECOMMENDATION 6
Use of Federal Trust Funds
Due to delays in local project delivery,unused obligation authority levels have increased
to the point where the State must take steps to ensure that it will be able to expend all of
its available federal funds. Caltrans,the California Transportation Commission, and
regional and local agencies must relieve project delivery backlogs and increase the
flow of funds through the State Highway Account.
FINDING/RECOMMENDATION 7
High Speed Rail
High Speed Rail offers a long-term prospect for improving transportation options between
major markets in California at an estimated cost of$20 billion to$30 billion dollars.
Any recommendation in this area is premature until the High Speed Rail Authority
completes its alignment,mode of service,and financial analysis. This committee will
continue to monitor this effort and the Southern California Association of Governments
(SCAG)Mag-Lev Study.
Commission Chair
Secretary
Maria Contreras-Sweet
Commission Co-Chair
Lieutenant Govemor
Cruz M.Bnstamante
Commissioners
Dr.Richard Atkinson Bill Haack-
Bob Balgenorth --► Gan•Hunt
Dr.Joseph Barkett Bruce Karat-
Don Benninghoven Senator Bettv Karnetre
Bruce Blanning Jim Kellogg
Keith Brackpool Don Ko11
Eli Broad George Marcus
Ron Burkle Dianne McKenna
James W. Callaway Eliseo Medina
John Case Assemblywoman
Peter Chernin Carole Migden
Lein Coleman Mike Paparian
Dave Condit Norm Pattiz
Martha Dias-As_kena:v Art Pulaski
Dr. Thomas A.Dillon Audrev Rice Oliver
Phil DiNapoli Tom Savles
Don Doser Sam Schuchat
Dr.Steve Erie Gordon Smith
Gary Fazzino Lester Snow
Chief Justice Steven Szalav
Ronald M. George Ronald N. Tutor
Jim Ghielmetti Erik Vink
Sam Ginn Max Warren
Gene Hale Richard Ziman
Jerry Halfisev
v ,
-
e r kLg�1r • �' ' iF' �r r
Y'Y-S rr r � 4��. •'h C - - - G t.yY�
Sx� iI SF 4.. � •
•k LP �1�
�rrj �� •� rW��IL r � � � r• •
ORANGE COUNTY SANITATION DISTRICT 9e �
w
September 15, 1999
-hunt:
(714)982-2411
Honorable Kathleen E. O'Leary
wing addrena: Presiding Judge of the Superior Court
va Boa 8127 700 Civic Center Drive West
is ra,a,ta;n Val",r
92]28-812] Santa Ana, CA 92701
E
street address:
10844 Ellis Aerus SUBJECT: Grand Jury Report"Coastal Water Quality and Urban Runoff in
92]08-]018 Orange County"
This letter is in response to the Findings from the Orange County's Grand Jury
Walter Report"Coastal Water Quality and Urban Runoff in Orange County." Specifically,
Atecies the Orange County Sanitation District(Hereinafter District) is required to respond to
Findings"1" and "2"as listed in the report. The District has reviewed the report, and
t Cities the following comments are submitted in response to its Findings. The District
Anaheim appreciates the opportunity to respond to the report, and the Grand Jury should be
a'44 commended for addressing this important and timely issue of coastal water quality
evens Park j and urban runoff.Lypress
( rwnrem cagey
i m deo- The District is a legislatively created special district mandated to provide sewage
w ngzon saaM collection and treatment in the northern and central Orange County area. The
Le Habra District's service area includes the following local cities:Anaheim, Brea, Buena Park,
La Patna Cypress, Fountain Valley, Fullerton, Garden Grove, Huntington Beach, La Habra, La
i � f Bey,"' ;
No Palma, Newport Beach, Orange, Placentia, Santa Ana, Seal Beach, Stanton, Tustin,
f orange Villa Park, Westminster, and Yorba Linda.
r an.Ana
j Sesl eeaon, Wastewaters are also received from the following entities: Unincorporated areas of
Tustin Orange County, Costa Mesa Sanitary District, Irvine Ranch Water District,
✓Ma Parr; Rossmoor/Los Alamitos Area Sewer District, Midway City Sanitary District, Santa
ro'he Lvid. Ana Watershed Project Authority, Sunset Beach Sanitary District, U.S. Marine Corps
I Gnmy of Orange Air Station El Toro, U.S. Marine Corps Air Facility Tustin, Naval Weapons Station
P Seal Beach, and Air Forces Reserve Center Los Alamitos.
tenter, Glstritts
Gs. Mass The District provides wastewater collection, treatment and disposal for 2.2 million
Mldwa, D1y residents. The District maintains two wastewater treatment plants located in
Water Districts Fountain Valley and Huntington Beach that process an average dry-weather flow of
240 million gallons per day(MGD). The District operates 650 miles of sanitary
t ' ^°Fie h sewers and 21 pump stations to transport sewage to the treatment plants. The
upstream member agencies operate a total of 5050 miles of sanitary sewers and 100
pump stations. The treated wastewater is discharged to the Pacific ocean through a
10'diameter outfall pipe running along the ocean floor away from the mouth of the
Santa Ana River. The outfall diffuser discharges at a depth of 200 feet below sea
level at a distance of 4.5 miles from the shoreline.
t
I
- "ro Pretatt Me Pudic Hearts and Me E.e,.am Mrough Eacel ence,n WBsleweter Syxems'
I
Honorable Kathleen E. O'Leary
Page 2 of 10
September 15, 1999
Finding 1 of the Grand Jury Report:
Historically, nonpoint source pollution received little emphasis and it
continues to be a major source of ocean pollution. Many programs addressing
ocean pollution have been initiated by agencies and organizations in the
county but there is insufficient coordination of effort both within the county
and between Orange County and adjacent counties.
While the District does not have responsibility over stormwater flows, the agency
works to integrate its activities with the community on a watershed basis. The
District uses three mechanisms to coordinate action on stormwater issues: its ocean
discharge permit, participation in watershed organizations to integrate its activities in
the Santa Ana River and Newport Bay watersheds, and the use of stormdrain
diversions into the sewer system. There are also important regulatory
developments, discussed below, that will focus attention on this issue of urban runoff
and stormwater flows.
Ocean Discharge Permit
The District operates under a National Pollution Discharge Elimination Permit
(NPDES)jointly issued by the Environmental Protection Agency, Region IX (EPA)
and the Santa Ana Regional Water Quality Control Board (RWQCB). This permit is
based, in part, on an extensive monitoring program that was developed with much
public input. It is composed of three sections: core monitoring, regional monitoring
and special studies.
The core monitoring program assures protection of local beaches from the influence
of the District's effluent plume by monitoring seventeen shoreline locations at least
five times per week during the recreational season (Memorial Day through Labor
Day). The monitoring is done using three bacteriological indicators, and it is
coordinated with the Orange County Health Care Agency(OCHCA) monitoring
program. Both agencies monitor for Total Coliform, Fecal Coliform and
Enteroccocus, as required by the Department of Health Services and the State
Water Resources Control Board (SW RCB). All of our data is transferred to the
OCHCA on a weekly basis, and it is provided to them immediately upon any
indication that beach standards are not met for the protection of swimming. The
OCHCA has worked with the District and the RWQCB to establish this shoreline
monitoring program. See a further discussion below on the recent beach closures
along Huntington Beach.
Honorable Kathleen E. O'Leary
Page 3 of 10
September 15, 1999
The District also participates in Regional Monitoring with the Southern California
Coastal Water Research Project(SCCWRP). The District is a founding member of
SCCWRP, and we have worked closely with the project for many years. Most
recently, the District has worked with SCCWRP on important regional monitoring
studies including the 1994 and 1998 Southern California Bight studies (the Bight
includes the coastal area from northern Baja California up to Ventura County). Also,
the District participated in the Santa Monica Bay Epidemiological Study and a recent
Bacteriological Study that included stormdrain outlets along the Bight. All of these
projects have contributed significantly to a further understanding of the impacts from
stormwater and urban runoff along the Southern California Coast.
The District's ocean discharge permit also contains a requirement for Special
Studies to gain a further understanding of the local water quality conditions.
Ongoing studies include Plume Tracking and a greater understanding of the
oceanographic conditions in Newport Canyon. The Plume Tracking study will help
us to better understand the movement of the District's wastewater plume in the
offshore waters. And a study of Newport Canyon (which begins directly offshore
from the Newport Beach pier) is designed to assess if there are any impacts in the
canyon from the District's effluent plume. Both of these studies are important to the
issue of stormwater as the District seeks to distinguish any impacts from its
operations from other discharges into local waters.
Ongoing Watershed Activities
The District participates with the following agencies and organizations over
watershed issues: The Santa Ana Watershed Project Authority, the Santa Ana
Regional Water Quality Control Board (RWQCB), the State Water Resources
Control Board (SW RCB)the Orange County Health Care Agency, the Newport Bay
Coordinating Council, the Santa Ana River Watershed Group (SARWG), the Orange
County Water Task Force, the Water Advisory Committee of Orange County, the
United States Environmental Protection Agency, the United States Geological
Survey, and the National Oceanic and Atmospheric Administration.
The District's activities related to stormwater and urban runoff include:
• A close working relationship with the Orange County Healthcare Agency to
provide and exchange important data on bacteriological indicators along local
beaches.
I
Honorable Kathleen E. O'Leary
Page 4 of 10
September 15, 1999
• The development of a dry-weather diversion of stormwater/urban runoff from
"The Dunes" Beach area in upper Newport Bay into the District's sanitary sewer
system. This is discussed further below.
• Provided scientific expertise to the Department of Health Services (DHS) in the
development of beach posting and closure requirements pursuant to Assembly
Bill 411 (1997) by Howard Wayne.
• Have provided testimony to the State Water Resources Control Board (SWRCB)
on the development of new criteria for the protection of beach swimming and
recreation. Part of these discussions have been about the need to coordinate
regulatory requirements between DHS and the SWRCB in order to maximize
resources and assure consistency.
• Participant and author in the Santa Monica Bay Epidemiological Study to develop
new standards for beach swimmer health protection.
• Participant in the SCCW RP study of beaches and stormwater outlets to beaches
for bacteriological indicators.
• Participant in two (2) Southern California Bight studies in conjunction with
SCCW RP and numerous other public entities during 1994 and 1998.
• Founding member of the Santa Ana River Watershed Group, a self-selected
(voluntary)organization designed to pool resources and influence to resolve
water quality, water quantity, endangered species, open space, flood control,
agricultural and other issues of concern in the Santa Ana River Watershed. For
this project, the District received the prestigious 1999 Public Service Award by
the California Association of Sanitation Agencies.
• The Groundwater Replenishment System (GWR) is ajoint project of the District
and Orange County Water District (OCWD) to implement large-scale water
reclamation and defer the construction of a second ocean ouffall. The project will
augment the District's capacity to store and dispose of flows during peak winter
storms by diverting up to 100 mgd of secondary wastewater to the OCW D. The
highly treated secondary wastewater, now discharged to the ocean, would
undergo advanced water treatment; microfiltration, reverse osmosis and
disinfection. The purified water will meet all state and federal drinking water
standards. Recycled water from the project will be used to support the seawater
intrusion barrier and the groundwater basin recharge, including future landscape
Honorable Kathleen E. O'Leary
Page 5 of 10
September 15, 1999
irrigation and industrial applications. The project would create a new, safe and
reliable water supply to meet increase water demands projected for Orange
County.
• Participation in a Beach Closure Prevention Sub-committee with the SW RCB and
other agencies to review Best Management Practices and Asset Management
Programs to reduce local beach closures.
• Inflow and Infiltration Reduction —A program established with local agencies
(cities and sanitary districts)within the District's service area. The program
provides funding for local agencies to repair and/or replace aging facilities that
will result in reduced inflow and infiltration (1/1) entering the District system. The
District's co-fund projects sponsored by the local agencies by either contributing
up to 50% matching funds or by a combination of contribution and low interest
loans. Under the program, local agencies submit project proposals for District
funding. The proposals are evaluated for funding by the District Guidance
Review Committee (Committee); a committee made of city representatives,
District Directors, and local agency staff. During FY 98-99, the first year of the
Cooperative Projects Program, approximately$3 Million in funding request were
received. Under full-implementation of the overall program, the District is
anticipating a 20% reduction in rainfall induced 1/1 by the year 2020.
• The District provides training and assistance in Spill Response Procedures for
local cities and other interested parties. This program was included the Water
Environment Federation's national publication. The District maintains one of the
best records on preventing spills from its sewer system. For the last ten years,on
average, the District has had less than one beach closure per year caused by a
spill from the District's system.
The District remains committed to working with the local community including
residents, agencies, and other organizations on a watershed basis to improve overall
water quality and address other environmental concerns.
Dry-Weather Diversions of Storrnwater/Urban Runoff
The District recently participated in a study of microbiological indicators along the
shoreline running from Point Conception down to Baja California (The Southern
California Bight). The study found that increased levels of bacteria indicators were
about ten times more likely to occur in stormdrain outlets than the portions of
Honorable Kathleen E. O'Leary
Page 6 of 10
September 15, 1999
beaches not impacted by runoff. The Study was published in SCCWRP's annual
report. These and other studies have helped to raise concerns about the impacts
from runoff upon recreational waters.
Due to these concerns about urban runoff, the District is evaluating placing some
stormdrain/urban runoff sites into the District's sewer system. Combined sewer and
flood control systems are common in the Eastern United States, and separate
sanitary sewer systems are common in the West. However, more agencies with
separate sanitary sewer systems are beginning to accept dry-weather stormdrain
flows in order to help prevent impacts to local beaches from urban runoff. The
District is working on three diversion projects as discussed below.
The District operates under an NPDES ocean discharge permit issued by the EPA
and RWQCB. This permit has strict effluent limits for conventional and toxic
pollutants. There is concern that untreated dry-weather urban runoff may contain
high levels of some toxic pollutants such as metals and pesticides. Also, spills of
flammable compounds could cause a hazardous condition in the sewer system. The
District's collection, treatment and outfall systems have limited capacities. It is
important that the District does not exceed the capacities of any of these systems
since that could endanger the public health and the environment. Any diversion
project must have a monitoring program and operational requirements to assure
protection of the District's systems and compliance with the District's ocean
discharge permit.
The Dunes Beach in Upper Newport Bay has had repeated problems meeting
bacteriological standards for swimming. The main suspect causing failure to meet
standards is a local stormdrain. The District, in consultation with the OCHCA and
the RWQCB has agreed to divert these flows into the District's sewer system during
the dry-weather season (approximately April through October of each year). There
is currently a temporary diversion in place, and the District, in conjunction with the
City of Newport Beach and local property owners, is developing a more permanent
diversion structure.
The District has also received a proposal from the Newport Beach Surfrider Chapter
to divert dry-weather flows from the Santa Ana River into the District's emergency
outfall. This is a 78"diameter outfall structure that has not been used since the
current 10' diameter outfall began service in 1971. The 78"diameter outfall extends
1.5 miles offshore from the mouth of Santa Ana River, and testing has confirmed that
it remains available for emergency high flow conditions. The District's ocean
discharge permit limits the use of this second outfall to emergency situations. The
Honorable Kathleen E. O'Leary
Page 7 of 10
September 15, 1999
RWQCB and EPA would need to approve its use for urban runoff flows. The
Surfrider proposal has also been submitted to the County of Orange for their review.
The District will contact both the County of Orange and the Surfrider for further
action after it has completed its review of the proposal.
Typically, dischargers to the District's system will apply for a permit to discharge
through the District's Source Control Division. The Source Control Division has not
yet developed specific requirements or guidelines for the discharge of
stormwater/urban runoff into the District's system. The primary concerns are the
presence of toxic pollutants, capacity of the sewer system, and wet-weather flows.
These issues, along with treatment and capacity costs, will be reviewed by the
District in establishing requirements for stormwater/urban runoff discharges.
Recent Beach Closures in Huntington Beach
The District has been spearheading an investigation into the recent closures of
beaches along Huntington Beach. The District's monitoring program detected
bacteriological indicator levels in excess of swimming/recreational standards. These
numbers were immediately reported to the OCHCA, and the OCHCA began closing
beaches in early July 1999. The District increased its shoreline monitoring program
in coordination with the OCHCA, and it also began an exhaustive investigation into
the source of the bacteria.
Initially, the District was concerned that the high bacteria levels were caused by a
leak from the District's sewer system. In response to this concern, the District
inspected all of its local facilities to assure their integrity. All of the inspections
established that there were no leaks, breaks, or failures in the sewer system. The
District has participated with numerous local agencies, federal agencies, elected
officials, consultants, and academics to research the cause of the high bacteria
levels. To date, the District has spent in excess of$1.2 million on the investigation,
and the source or sources of the high bacteria levels have not been located. This
District continues to work cooperatively to solve this problem and prevent future
beach closures.
Due to suspicions about the presence of bacteria in stormwater/urban runoff flows
into the Talbert Marsh, the District has worked with the City of Huntington Beach and
the County of Orange to divert flows from their stormdrain systems into the District's
sewer system. These diversions will continue on an emergency basis until October
1999, the end of the dry-weather season. As a part of the overall investigation, the
Honorable Kathleen E. O'Leary
Page 8 of 10
September 15, 1999
future need for these diversions will be evaluated. At this time, it has not
conclusively been determined if these stormdrain outlets caused or contributed to
the high bacteria levels along the beach.
It is too early to determine how important the use of stormdrain diversions into local
sewer systems will be to improving beach conditions. The District will evaluate each
proposal for a diversion on a case by case basis to determine if and when Flows can
be accepted into its system. The District strongly supports maintaining open
beaches along Orange County's coast, and we recognize the beach as our most
important local resource. The District will bring its resources and technical expertise
to bear in support of this commitment.
Regulatory Developments
The are current regulatory developments that will impact controls on Stormwater and
urban runoff. The first is Califomia's Nonpoint Source Pollution Control Program.
The revised draft was published on July 2, 1999, and it is due to be adopted by the
SW RCB and California Coastal Commission this autumn. The program contains a
strategy, implementation plan and management measures to control polluted runoff.
The program is scheduled to run from 1998-2013.
Another important development is a proposed regulation by EPA regarding Total
Maximum Daily Loads (TMDLs) [See 64 Federal Register 46011, August 23, 1999.1.
TMDLs are the sum of all allowable discharges of a particular pollutant to an
identified water body. When waters do not meet standards for protection, they are
listed as impaired and require the development of TMDLs. TMDLs must consider
discharges from point sources and nonpoint sources in their development. This will
help to focus attention on impairments associated with stormwater and urban runoff,
where appropriate. EPA reports that a majority of impaired waters are polluted by
nonpoint sources.
Finding 2 of the Grand Jury Report:
Although there is agreement that the average citizen is a significant
contributor to nonpoint source pollution, not enough has been done to enlist
the cooperation of the public in eliminating the sources of the problem. There
is also inadequate information reaching the public concerning the correct
disposal of pollutants.
The District agrees that the public needs more and better information about the
relationship between their actions and urban runoff. While the primary focus of the
Honorable Kathleen E. O'Leary
Page 9 of 10
September15, 1999
District's public information efforts center on our operations, responsibilities and
permitting for industrial facilities, we also include the problem of urban runoff in our
presentations and printed materials.
The District provides tours of our facilities in Fountain Valley to thousands of people
each year. Most tours are given to local school children, but other visitors include
residents, local officials, other wastewater treatment workers, and foreign visitors.
The tours include an explanation of our operations as well as information about other
agencies such as those responsible for stormwater Flows, flood control, hazardous
waste disposal, and trash collection. Most visitors are indeed, surprised to learn that
the County's sanitary sewer and storm drain systems are separate entities. There is
a general belief that"everything is treated," including substances dumped in the
gutter. To help dispel this misconception, the District includes a discussion of urban
runoff in our tour presentation. Printed materials about urban runoff are included in
our information packets along with watershed management posters that are
distributed upon request to schools.
The District also participates in the Orange County Fair each year. This is an
important outreach tool that reaches tens of thousands of local residents in our
service area. The Fair provides an excellent opportunity to explain the District's
operations and planned activities to the interested public on an individual basis. And
residents are interested in many of our activities including water reclamation, water
conservation, industrial permitting, water quality monitoring, and how our facilities
operate. Visitors to the booth are also told how they can help protect the
environment by responsibly disposing of household waste. The Fair has consistently
proven to be an effective communications tool to reach the public with information
about the agency.
The District also maintains an Internet site located at www.ocsd.com. The agency
continues to improve the site to provide the public detailed information about our
agency and its operations. The site also provides important links to other sites,
including the County of Orange, that may be of Interest to those looking for
information about the disposal of wastes. The District is participating in a pilot
project with the EPA and RWQCB to post real-time beach closure and advisory
Information and historic bacteriological monitoring data on the Internet. The District
provides this information to the OCHCA, and the OCHCA forwards It to the SWRCB
and EPA for posting. This site is in development and not yet available for public
viewing. Once it goes live, it will be accessible through the EPA's Internet site at
www.eoa.eov or by linking from the District's web site. Beach conditions are also
available through the environmental organization Health the Bay at
www.healthebay.ore.
Honorable Kathleen E. O'Leary
Page 10 of 10
September 15, 1999
Closing
Thank you for the opportunity to comment on this important document, Coastal
Water Quality and Urban Runoff in Orange County. The report is timely and raises
important issues about the impact on local waters from stormwater/urban runoff.
The District recommends that the County of Orange, as the lead agency on the
municipal storm water permit, prioritize the storm drains and other freshwater outlets,
in consultation with the city co-permittees and OCHCA, that are problematic
(i.e., causing chronic beach closures, postings, etc.). Based in this prioritization, the
County should submit a proposal to OCSD for sewering (or otherwise managing)
dry-weather flows. The Orange County Sanitation District remains committed to
working with local partners on a watershed basis to resolve water quality and other
environmental issues. If you have any questions or comments regarding this letter,
please contact James Colston from my staff at 714-593-7458.
Dontald F. Mcln
General Manager
DFM/JC:mcm
H.Xwp.dt9Ms%3550%350LLeMeu3 dnd Jury Report Response FlnalAm
c: Jan Debay Board Chair
Board Members
County of Orange, PF&RD
EMT
J. Colston
ECM Files
9ii�
The Safe Drinking Water, Clean Water, Watershed
Protection and Flood Protection Act of 1999
Assembly Bill 1584 (Machodo/Costa)
Enrolled to Governor on September 10, 1999
OCSD/SANTA ANA RIVER WATERSHED BENEFITS
Southern California Integrated Watershed Program [See attached excerpts] $235 million
This money is allocated to the Santa Ana Watershed Project Authority,upon
appropriation by the Legislature to the State Water Resources Control Board. The
following projects are allowed under the project:
• Basin water banking
• Contaminant and salt removal through reclamation and desalting
• Removal of nonnative plants and the creation of new open space and wetlands
• Programs for water conservation and efficiency,and storm water capture and
management
• Planning and implementation of a flood control program to protect agricultural
operations and adjacent property to assist in abating the effects of waste discharges.
Coastal Nonpoint Source Control Program (Huntington Beach) [See $4 million
attached excerpts]
Provides for monies to the City of Huntington Beach,upon appropriation by the
Legislature,to fund multiagency studies to establish recommendations to address
coastal nonpoint source pollution in the tidal marshes and coastal waters,and to
implement these recommendations. Agencies authorized to conduct the studies include
cities,counties,flood control districts and sanitation districts.
Watershed Protection Program (statewide) $90 million
Grants(subject to appropriation by the Legislature)to assist local agencies in
implementing multi-objective watershed plans that help restore fragile
ecosystems by controlling or eliminating pollution,reducing flooding,
controlling erosion,improving water quality;60%of funds to be spent in six-
county area of Southern California;earmarks$35 million for grants to small
communities;transfers$2 million to Pajaro River Watershed Flood Prevention
Authority,$5 million to Clover Creek Flood Protection and Environmental
Enhancement Project,$2 million for Clear Lake watershed and$1 million for
Russian River watershed.
Non-Point Source Pollution Control Program $100 million
Grants(subject to appropriation by the Legislature)for local projects that
protect the beneficial uses of water through the control of non-point source
pollution;60%of funds to be spent in six-county area of Southern California;
transfers$10 million for research and mitigation to protect water quality from
pesticides;$5 million can be used for loans to finance concoction of projects
designed to manage animal nutrients from animal feeding operations.
Clean Water Program $100 million
Grams and low-interest loans to aid in construction or implementation of
projects under the Clean Water Act including$30.5 million for loans pursuant
to Clean Water Act,$34 million for grants for construction of water treatment
works m small communities,$35.5 million(subject to appropriation by the
Legislature)for treatment works in Manteca,Stockton,Tracy and Grange
Cove and$7 million to local agencies for groundwater remediation projects.
Coastal Non-Point Source Pollution Control $90 million
Grants and low-interest loans(subject to appropriation by the Legislature)to
aid in construction or implementation of projects to improve water quality at
public beaches;60%of funds to be spent in sin-county area of Southern
California;earmarks S4 million(subject to appropriation of the Legislature)to
City of Huntington Beach to study biological contaminants in tidal and coastal
marshes and$3 million(subject to appropriation of the Legislature)for
environmental and engineering studies for the San Diego Regional
Conveyance Facility by the San Diego County Water Authority.
Water Recycling Program $40 million
Provides grants(subject to appropriation by the Legislature)and loans for
public agencies to build facilities to produce and deliver recycled water,
transfers unallocated funds from prior bond acts(approximately$70 million)
into new program;60%of funds to be spent in six-county area of Southern
California;contains language to encourage the SWRCB to expedite the review
and processing of agreements to carry out purposes of program and provides
for progress report to Legislature.
Water Conservation Program $155 million
Provides grants and loans(subject to appropriation by the Legislature)to build
and/or improve infrastructure to conserve water used for both urban($30
million)and agricultural purposes($35 million)and groundwater recharge
facilities($30 million);provides grants for projects in economically-
disadvantaged areas for the repair,replacement,restoration or rehabilitation of
existing water distribution systems($60 million);transfers unallocated funds
from Proposition 204.
Flood Control Subventions S45 million
Funds state's share of the nonfederal costs of local flood protection projects
authorized as of January 1,2000,in specified counties;also contains language
indicating that the state's share of nonfederal costs of projects adopted and authorized
after January 1,2001,shall not exceed that portion of nonfederal costs authorized
pursuant to specified provisions in Water Code.
WATER QUALITY/WATERSHED BENEFITS
Sate Drinking Water Program $70 million
Loans and grants for undertaking infi istmcture improvements
and related actions to meet safe drinking water standards;leverages five
federal dollars for every state dollar.
Seawater Intrusion Control $25 million
Provides loans(subject to appropriation by the Legislature)to control seawater
intrusion;transfers unallocated funds from Proposition 204.
River Protection Program $95 million
Provides funding(subject to appropriation by the Legislature)for the acquisition
2
and restoration of riparian habitat,rivcrine aquatic habitat and other lands in close
proximity to rivers and streams;requires that 60%of funds be used for projects new
metropolitan areas;earmarks$10 million for the San Joaquin River Parkway
Conservancy and$2.5 million for the Kem River Parkway Project.
Coastal Watershed Salmon Habitat Program $25 million
Provides funding(subject to appropriation by the Legislature)to protect,restore,
acquire and enhance habitat for salmon;may be used to leverage funds,wben available.
Water and Watershed Education Program $8 million
Provides funding(subject to appropriation by the Legislature)for various watershed
education programs including the San Joaquin Valley Water Institute at California State
University at Fresno($3 million),Delta Science Center(S2 million)and Watershed
Science Laboratory in the North Delta($3 million)
WATER SUPPLY BENEFITS
Groundwater Storage $200 million
Grants(subject to appropriation by the Legislature)for feasibility studies,
project design or construction of facilities for groundwater storage projects;
ups feasibility studies at$200,000 and construction projects at$50 million;
priority given to projects with available third-party funds(excluding CVP
Restoration Fund);no less than 40%of funds in subaccount to be expanded
for studies,projects and facilities within watersheds of Central Valley.
Bay/Delta Multi-Purpose Water Mgmt. Program $250 million
Provides funding(subject to appropriation by the Legislature)for projects
identified in the CALFED EIR/EIS as a Stage I Action: $17 million for
treatment facilities or to relocate discharge facilities for agricultural drainage,
S40 million to control waste discharges contributing to low dissolved oxygen,
$120 million for fish screens in the Delta,$40 million for permanent barriers
in the Delta,$17 million for controlling abandoned mine drainage and$16
million for permanent barrier at Grantline Canal.
Interim Reliable Water Supply and Water Quality Infrastructure
and Management Program $180 million
Loans and grants(subject to appropriation by the Legislature)for programs or
projects located outside the Delta including: new or expansion of existing
groundwater storage and recovery projects,for acquiring rights to use storage
in existing reservoirs,for facilitating improved water treatment,water
transfers and exchanges for water supply and quality improvements and for
state-of-the-art agricultural water conservation programs;priority given to
projects that: can be completed prior to March 8,2009,provide near-term
benefits,improves water quality and protects water levels at San Luis
Reservoir,includes public-private partnerships and are sponsored by a public
agency with water supplies that we being or would be impacted by Delta-
related shortages and water quality degradation.
Lake Elsinore and San Jacinto Watershed Program $15 million
Provides funds(subject to appropriation by the Legislature)for improving and
rehabilitating the Lake Elsinore and San Jacinto Watersheds and the water
quality of Lake Elsinore.
3
FLOOD PROTECTION BENEFITS
Floodplain Mapping Program $5 million
Provides funds(subject to appropriation by the Legislature)to assist local land
use planning to avoid or reduce future flood risks by mapping newly identified
floodplains and revising outdated maps.
Flood Protection Corridor Program $70 million
Provides grants to local agencies(subject to appropriation by the Legislature)for
the acquisition,restoration,enhancement and protection of real property for flood
protection,agricultural land preservation and wildlife habitat protection;
earmarks$1 million for technical assistance to cities and counties;
earmarks$5 million for the City of Santee for flood protection projects.
Delta Levee Rehabilitation Program $30 million
Fonds the Delta Levee Maintenance Subvention Program($IS million)and special flood
protection projects on specified Delta islands($15 million).
Urban Streams Restoration $25 million
Grants(subject to appropriation by the Legislature)for small flood protection and erosion
control projects that typically include work by community conservation corps.
Capital Area Flood Protection $20 million
Partially funds state's share of the costs of federally-authorized flood management
projects in Sacramento County(subject to appropriation by the Legislature).
San Lorenzo River Flood Control $2 million
Fonds state's share of the costs of federally-authorized flood management projects
in the Santa Cruz region(subject to appropriation by the Legislature).
Yuba Feather Flood Protection Program $90 million
Provides funds(subject to appropriation by the Legislature)for flood protection
projects($70 million)and fish and wildlife enhancements($20 million)along the
Yuba and Feather Rivers and the Colusa Drain;allocates$2.6 million to pay for
state's share of levee repairs in Sutter County.
Arroyo Pasajero Watershed Program $5 million
Funds(subject to appropriation by Legislature)flood control projects protecting
the California Aqueduct in the area of the Arroyo Pasajem Crossing.
4
P
[EXCERPTS FROM AB 1584]
AMENDED IN SENATE SEPTEMBER 9, 1999
AMENDED IN SENATE SEPTEMBER 3, 1999
AMENDED IN SENATE AUGUST 26, 1999
AMENDED IN SENATE JULY 12, 1999
AMENDED IN ASSEMBLY APRIL 27, 1999
CALIFORNIA LEGISLATURE1999-2090 REGULAR SESSION
ASSEMBLY BILL No. 1584
Introduced by Assembly Member Machado and Senator Costa
(Principal coauthors: Assembly.Members Cardoza and Florez)
(Coauthors: Assembly Members Calderon,Kuehl,Strom-Martin,and Thomson)
(Coauthor:Senator Ortiz)
February 26, 1999
An act to amend Sections 13480, 14058,and 78621 of,to add Division 26(commencing with
Section 79000)to, to add and repeal Section 1812.6 of, and to repeal and add Sections 78626,
78648.12,and 78675 of,the Water Code,relating to financing a safe drinking water,water
quality,flood protection, and water reliability program,by providing the funds necessary
therefor through the issuance and sale of bonds of the State of California and by providing for
the handling and disposition of those funds,and declaring the urgency thereof,to take effect
immediately.
LEGISLATIVE COUNSEL'S DIGEST
AB 1594, as amended,Florez. Safe Drinking Water,Clean Water,Watershed Protection,and
Flood Protection Act.Under existing law,various bond acts have been approved by the voters to
provide funds for water projects,facilities,and programs. This bill would enact the Safe
Drinking Water, Clean Water,Watershed Protection,and Flood Protection Act which,if
adopted,would authorize,for purposes of financing a safe drinking water,water quality,flood
protection,and water reliability program,the issuance,pursuant to the State General Obligation
Bond Law,of bonds in the amount of$1,970,000,000. The bill would also provide for the use of
prescribed bond funds,and funds repaid to the state pursuant to certain loan contracts,for
specified programs established by this act The bill would require the Secretary of State to
submit the bond act to the voters at the March 7, 2000, statewide direct primary election.
The bill would amend a provision relating to the calculations of the interest rate to be applied to
certain loans from the State Water Pollution Control Revolving Fund.
The bill would require the Imperial Irrigation District, the Coachella Valley Water District, and
the Metropolitan Water District of Southern California to sign and adopt a prescribed
quantification agreement on or before October 15, 1999, and, if the districts do not do so, would
require the Governor or his sole designee to promulgate a quantification settlement by January
1, 2000, as specifted. The bill would impose specified duties on the Governor with respect to the
agreement or settlement.
9
The bill would declare that it is to take effect immediately as an urgency statute.
Vote: 2/3 . Appropriation: no. Fiscal committee: yes.
State-mandated local program: no.
The people of the State of California do enact as jollows:
SECTION 1. Division 26 (commencing with Section 79000) is added to the Water Code,to read:
DIVISION 26. SAFE DRINKING WATER, CLEAN WATER, WATERSHED PROTECTION,
AND FLOOD PROTECTION ACT
CHAPTER 1. SHORT TITLE
79000. This division shall be known and may be cited as the Costa-Machado Water Act
of 2000.
CHAPTER2. DEFINITIONS
79005. Unless the context otherwise requires, the definitions set forth in this chapter
govern the construction of this division.
79006. "Bay-delta" means the San Francisco Bay/Sacramento-San Joaquin Delta
Estuary.
79007. "Board" means the State Water Resources Control Board.
79008. "CALFED" refers to the consortium of state and federal agencies with
management and regulatory responsibilities in the bay-delta that are developing a long-term
solution to water management, environmental, and other problems in the bay-delta watershed.
79009. "Clean Water Act' means the federal Clean Water Act(33 U.S.C. Sec. 1251 et
seq.),and includes any amendments thereto.
79010. "Committee" means the Safe Drinking Water, Clean Water, Watershed
Protection,and Flood Protection Finance Committee created by Section 79212.
79011. "Delta" means the Sacramento-San Joaquin Delta.
79012. "Department" means the Department of Water Resources.
79013. "Fund" means the Safe Drinking Water, Clean Water, Watershed Protection, and
Flood Protection Bond Fund created by Section 79019.
CHAPTER 3. SAFE DRINKING WATER,CLEAN WATER, WATERSHED PROTECTION,AND FLOOD
PROTECTION BOND FUND
79019. The proceeds of bonds issued and sold pursuant to this division shall be deposited
in the Safe Drinking Water, Clean Water, Watershed Protection, and Flood Protection Bond
Fund,which is hereby created.
CHAPTER 6. WATERSHED PROTECTION PROGRAM
Article 5. Southern California Integrated Watershed Program
79104.20. The Legislature hereby finds and declares all of the following:
(a)The Santa Ana Watershed is experiencing increased water demands due to significant
population growth that has caused undue infrastructure dependence and strain on imported water
supplies.
P
(b)Regional programs have been developed to address the problems facing the
watershed. These programs have four main elements, as follows:
(1) Storage of more than one million acre-feet of water from wet years in groundwater
storage basins.
(2) Conservation, including water use efficiency and reclamation, that results in the
substantial development of new usable supplies.
(3)Desalting and treatment of brackish water to allow poor quality water to be reclaimed
and used.
(4)Enhancement of native habitat along the river and its tributaries.
(c)The water supply programs proposed by the Santa Ana Watershed Project Authority
will develop significant new water supply and storage capabilities,thereby reducing the imported
water needs of urban southern California, especially during dry years.
79104.22. (a)There is hereby created in the account the Santa Ana River Watershed
Subaccount.
(b)For purposes of this article, "subaccount" means the Santa Ana River Watershed
Subaccount created by subdivision(a).
79104.24. The sum of two hundred thirty-five million dollars ($235,000,000) is hereby
transferred from the account to the subaccount.
79104.26.The money in the subaccount,upon appropriation by the Legislature to the
board,may be used by the board for allocation to the Santa Ana Watershed Project Authority for
all of the following projects for the purposes of rehabilitating and improving the Santa Ana River
Watershed:
(a)Basin water banking in one or more of the following basins: Chino, Colton, Orange
County,Riverside, San Bernardino,and San Jacinto.
(b)Contaminant and salt removal through reclamation and desalting in Orange County,
San Jacinto, or other basins in the watershed.
(c) Removal of normative plants, and the creation of new open space and wetlands.
(d)Programs for water conservation and efficiency, and storm water capture and
management.
(e)Planning and implementation of a flood control program to protect agricultural
operations and adjacent property and to assist in abating the effects of waste discharges into
waters of the state, consistent with the requirements of Section 13442.
79104.30. It is the intent of the Legislature to urge the federal government to allocate
funds for projects to improve the Santa Ana River Watershed to match the state's financial
commitment to the projects described in this article.
79104.32. It is the intent of the Legislature that the expenditure of the funds under this
article be made through a broad-based watershed stakeholder process.
79104.34.Not more than 3 percent of the total amount deposited in the subaccount may
be used to pay costs incurred by the board in connection with the administration of this article.
CHAPTER 7. CLEAN WATER AND WATER RECYCLING
PROGRAM
Article 5. Coastal Nonpoint Source Control Program
79148.7. Notwithstanding any otherprovision of this article, the sum ojfour million
dollars ($4,000,000), upon appropriation by the Legislature to the board, shall be allocated by
i
the board to the City of Huntington Beach to fund multiagency studies to establish
recommendations to address coastal nonpoint source pollution in the tidal marshes and coastal
waters, and to implement those recommendations. Agencies authorized to conduct the studies
and implement the recommendations may include, but need not be limited to, municipal and
county governments,flood control districts, and sanitation districts.
Curt Pringle & Associates�
public relations*consulting•government a0airs
September 20, 1999
Don McIntyre
Genral Manager, O.C. Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708
Dear
As you probably have already heard, on Friday, September 10, 1999
the State Legislature passed a $1.9 billion dollar water bond
measure designed to address California's water needs. The bond,
expected to be signed by Governor Davis, will be headed for the
March 2000 ballot for a statewide vote.
By passing a resolution in favor of the Santa Ana Watershed
Project Authority (SAWPA) plan and through the active involvement
of many groups on behalf of Southern California interests,
collectively we were able to secure $250 million dollars
specifically earmarked to fund watershed replenishment projects
along the Santa Ana River benefiting Orange, Riverside, San
Bernardino and parts of Los Angeles Counties.
Specifically, the bond provides dedicated funding for Orange
County groundwater replenishment, Chino Basin clean-up and
conjunctive use, Santa Ana River Corridor open space, Santa Ana
River water resources and habitat enhancement, and Santa Ana
River Wetlands Development including Newport Bay Wetlands
Projects to name just a few. Additionally, $45 million in flood-
subvention monies was earmarked in the bond with a major share
coming to Orange County. Furthermore, because most other items
within the bond are not specifically earmarked, other
water projects throughout the Southland may still apply for
dollars in the general fund of the bond. In all, the water bond
is the most money Southern California, and Orange County in
particular, has ever received in a bond package for water
projects and water storage.
On behalf of SAWPA, we sincerely appreciate your support for
Southern California water projects and in particular, SAWPA's
specific proposal. Indeed, together with many other agencies and
city governments throughout Southern California, your hard work
proved effective in helping to ensure Southern California's clear
voice in the statewide water discussions as well as the region's
economic stability and quality of life we have all come to enjoy.
2532 dupont drive a irvine, california 92612-1254
ph:949/474-4090 a far: 949/474-4082 *e-mail: email C&curtpringle.com
SAWPA support
Page 2
Thank you again for your support of the SAWPA plan. Please
let me or Bill Guzik of my office know to whom I should
address future information regarding water-related issues.
We can be reached at (949) 474-4090.
I look forward to hearing from you and continuing to work
with you on water and other important issues affecting our
community.
Si rely�"y��/�
Cu t Pring}€\
1 4
'te -
ORANGE COUNTY SANITATION DISTRICT
September 15, 1999
(714)962 2411 To the Chair and Members
of the Board of Directors
milling addroc
PO a 8127 Subject: Board Letter
Foul valley.CA
92728 612)
.viit:dd„ii: The following are items that you may find interesting. If you need additional
10844 Ell Avenue
Fountain valley.CA information on any of the items, please call me.
92708 7018
Update on Huntington Beach Contamination Investigation
M.ml» The investigation into the cause of the high bacterial counts along Huntington Beach
Agencies continues. A thorough cleaning and visual inspection ruled out the siphon portion of
• the District's Coast Trunk Sewer as a possible source of the beach contamination. In
titles late August, attention was focused on urban runoff from upstream drainage channels
that flow through Talbert Marsh and onto the beach. Several storm drain pump
Aral stations and a construction dewatering project that discharged into the Talbert
Buena Pa k Channel were rerouted and connected to the District's sewer system in late August.
Cy,. During the week prior to Labor Day Weekend the bacterial indicator counts dropped
FDuntain Uelley back to normal and, as a result, the Orange County Health Care Agency reopened the
Fullerton Garden Grove entire stretch of beach from the mouth of the Santa Ana River to Goldenwest Avenue
Harlington Beach that had been closed.
rnne
Le Pyu b
La Palma During the first week in September, however, some of the bacteria standards were
L.Alamrtoe 'Again exceeded and a stretch of Huntington State Beach was posted (but not closed).
NewPorc raeath
nge The Health Care Agency intends to post warning signs rather than close the beach
Orange 9 oY P 9 9 ( )
Morenoa when a standard is exceeded because they no longer believe the Contamination is
San.Are sewage-related. However, more beach closures are a possibility if the current surf-
SealBeech
Stanton zone monitoring or other testing reveals a possible link to a sewage source. Daily
e. bacteria counts are shown on the District's website, www.ocsd.com. Additional work
una Park
Verb. Linde by the District, City of Huntington Beach, and others, is planned to investigate the
storm drains in the area along with the Talbert Marsh and Santa Ana River as
County of Orange possible conduits for the contamination on the beach
Sanitary Districts As the District continues to participate in a lead role in the investigation of the
Cuath Maaa Huntington Beach closure project, we continue to incur costs associated with our due
Midway City diligence efforts. The beach closure, which lasted from the Fourth of July weekend to
Cos„r Districts the Labor Day weekend, has required thorough investigative and support efforts that
have resulted in significant Engineering, Technical Services, General Services,
Irnne Parch Communications and Administrative costs. The level of District effort has been
reported in some depth at the various Committee meetings as summarized above;
however, the overall costs have not yet been discussed in any detail as estimates
changed rapidly. As we begin to demobilize from our emergency-stance to a longer
term planning mode, our ability to estimate the incurred costs has improved. Thus
far, based on purchase orders and other preliminary data, it is estimated the District
has spent$1.2 million on all efforts related to the Huntington Beach closure project.
-To Protect the Pu06c Health and Me Erotronment through Ercellerce in"clareaser Systems'
Members of the Board
Page 2
September 15, 1999
These are categorized as follows:
• $535,000 related to siphon cleaning, leak investigation, and
engineering/construction for pipe downsizing.
$100,000 for initial Coast Trunk diversion of the siphon structure.
$147,000 for line cleaning, Closed Circuit Televising (CCTV), and minor
collection system repairs related to the beach closure investigation.
• $118,000 for research related to flow monitoring, beach hydropunching, and
ground-penetrating radar(GPR) studies.
$90,000 for an Outfall Dye Study(underway).
$34,000 for a Talbert Marsh study conducted by University of Southern
California staff.
• $62,000 in research vessel and associated in-house laboratory sampling costs
(largely lab staff time).
$7,000 in aerial photography and contracted document research.
• $106,000 in District staff time.
These project costs will increase, though (likely) not dramatically, as we continue to
refine our data and conduct further research into the source of the problem. We are
working cooperatively with the involved agencies to develop an equitable cost-sharing
plan related to this on-going project. Until such time when we are able to confirm one
or more sources for the Huntington Beach closure project, or unless future policy
direction dictates otherwise, current project expenses are being allocated to Revenue
Area 11. At minimum, siphon cleaning, remodeling and rehabilitation will be
permanently allocated to Revenue Area 11. We will be in a position to provide more
financial details at the October FAHR Committee and Board meetings.
Wastewater Agencies Comment on State-wide EIR on Biosolids
The nearly two-year process for the State Water Resources Control Board to write a
programmatic EIR has reached an important milestone. The deadline for public
comments on the draft EIR has closed. Staff from the Sanitation District has been
very much involved in the process. A copy of the comments that were recently
submitted to the SWRCB is attached. The comments were submitted jointly by CASA
(California Association of Sanitary Agencies), Tri-TAC(a technical advisory committee
to the State Water Resources Control Board), and SCAP (the Southern California
Alliance of POTWs). Two of the three signatures were those of our own staff
members who chair these groups, Mike Moore and Layne Baroldi.
Members of the Board
Page 3
September 15, 1999
EPA Supports Our Opposition to Class B Biosolids Ban in Kern County
The EPA has sent a letter to the Planning Department of Kern County. EPA indicates
that the existing practice of using Class B biosolids from the municipal wastewater
treatment plants in southern California on agricultural land in Kern County is not only
appropriate, but has several significant environmental advantages as compared to
other biosolids management alternatives. A copy of the letter is included.
AB 71 Signed by California Governor
Creating an immediate leap forward for the natural gas vehicle industry and clean fuel
industry advocates in general, California Governor Gray Davis signed AB 71
(Cunneen) into law. The bill was co-sponsored by the CNGVC and State's electric
vehicle coalition (CalETC). AS 71 will allow qualifying vehicles to use HOV lanes
without a restriction on vehicle occupancy. Bottom line: if you drive an alternate fuel
vehicle, you will be entitled to drive in the carpool lane by yourself.
Distinctive decals are being developed to identify qualifying vehicles to law
enforcement personnel and other motorists. The incentive becomes available on
July 1, 2000, providing the Department of Motor Vehicles time to implement a decal
issuing and verification system, and sunsets in 2007,
...And the Rubber Chicken Circuit Begins
As expected, we are receiving requests to discuss our observations about the
Huntington Beach incident. Charlie McGee spoke extemporaneously to a group of
coast pollution experts that were coincidentally assembled at a national conference in
San Diego in early September. Blake Anderson has been asked by SCAG's Energy
and Environment Committee to address the public policy implications of this
summer's incident at the Committee's October 7 regularly scheduled meeting.
Regulatory and operating agencies at the national, state and southern California
levels are watching Huntington Beach with considerable interest. They love a mystery
and they want to understand the implications of the tougher beach standards that
California enacted with AB 411. They want to use our real world experience to
struggle with the contradictory objectives of public health protection, reasonable
beach access, and affordable public infrastructure.
California Water Bond Ready for Governor's Signature and March 2000 Ballot
The California Senate and Assembly have approved a $1.7 billion bond measure that,
if signed by Governor Davis, will appear on the March 2000 ballot. As the directors
will recall, you authorized a resolution of support at the July Board Meeting. Our
support, along with similar resolutions from 40 other entities in Orange County, helped
to get the bill successfully through both houses of the legislature. The bill contains
money for a number of water quality and reliability initiatives here in our Santa Ana
Members of the Board
Page 4
September 15, 1999
River watershed, including money for correcting the impact of urban non-point source
runoff on Huntington Beach, and $37 million for the GWRS project.
As of this writing, staff has not obtained the specific language of the bill, but will do so
prior to the Steering Committee and Board Meetings of September 22, 1999. Full text
copies of the bill will be provided in your agenda folders Wednesday night, along with
a short synopsis of the bill's most significant features.
Staff will also brief the Steering Committee on the bill's main features and will report
on whether we believe the bill is sufficiently earmarked to maintain the support of this
Board. The July resolution of support required that projects for Orange County and
the Santa Ana River watershed by specifically earmarked and that the overall amount
of the bill be apportioned between northern and southern California based on
population.
SCAP Monthly Update
Also attached is SCAP's monthly newsletter, which contains several articles of
interest.
The Kiplinger Washington Letter's Report on Water
I have attached a copy of the August 20 Kiplinger Washington Letter that discusses
water-related issues nationwide.
SB 709 Workshop for POTWs and Storm Water NPDES Permit Holders
CASA and the League of Cities is putting on a workshop for POTWs and storm water
NPDES permit holders on the new RWOCB enforcement requirements mandated by
SB 709. Staff associated with negotiating our permits, permit compliance issues,
preparation of DMRs, enforcement response, etc. are candidates to attend this
training. Jean Tappan is coordinating a single response from the agency with the list
of names of people who will attend. Send her your list of names. She also has the
flyer about the So Cal session scheduled for Monday, Nov 1, Ontario Airport Marriott
Hotel, 9:30 a.m. to 2:30 p.m.
SCAOMD to Tackle Diesel Toxicity on Par with Ozone Programs
Expanding its role into new territory, the South Coast Air Quality Management District
is crafting a sweeping strategy to reduce the health threat people face from breathing
diesel exhaust and other carcinogenic chemicals polluting the air. The ambitious
plan, already under attack from the trucking industry [prior to its release], could lead to
Members of the Board
Page 5
September 15, 1999
the nation's first comprehensive regulations for battling airborne toxic substances.
The SCAOMD board is expected to formally direct its staff to complete work on the
outline for new and revised rules, which would rival in scale the agency's massive
strategy to combat ozone, the primary ingredient in smog.
SCAOMD intends to use an obscure, 12-year-old state law that grants the authority to
regulate public and commercial fleets of more than 15 vehicles.
Unlike the situation with ozone, the SCAQMD faces no federal or state mandates to
clean up toxic air pollutants. Last year, the California Air Resources Board declared
diesel soot a cancer-causing pollutant and is trying to figure out how to reduce the
threat. "This would put the SCAQMD ahead of the tune," said Felicia Marcus, the
EPA's regional administrator. "It is very encouraging"- From the LA Times, 9/10/99
Regional Board Addresses Waste Discharge Requirements for Animal Feeding
Operations
Attached is a letter dated September 10, 1999 that addresses the Regional Board's
recent adoption of Order No. 99-11 and the Cease and Desist Order No. 99-65. This
is a major step in protecting the regional groundwater basin and watershed.
Newspaper Clippings on File in Communications Department
The number of newspaper clippings that have been part of this monthly packet has
become overwhelming and has increased our photocopying and mailing costs. To
combat this problem, yet meet your information needs, we have established a
Directors Reading File in the Communications Department. Staff will continue to Gip
newspaper articles of interest On a daily basis and will be happy to send you copies of
items you may request. In addition, beginning this month, two folders marked
"Directors Reading File"will be placed on the back table prior to a Board meeting and
at all committee meetings. Please feel free to look through the file. Copies of
newspaper articles can be obtained by contacting Suzanne Smith of the
Communications Department,
714 593-7123.
Odor Complaints
During the past month we received four odor complaints about Plant 2 and two about
Plant 1. Staff made changes as necessary, which corrected the problems.
District to Host Peter Sandman, Risk Communications Expert
You may have heard about Peter M. Sandman, Ph.D., a national authority on
communicating risk and managing public outrage. He's spoken at several industry
conferences, including AMSA. The District will be sponsoring a day-long workshop
Members of the Board
Page 6
September 15, 1999
featuring Dr. Sandman on Wednesday, October 20, at Huntington Beach City Council
Chambers.
As a Director, you will receive one free registration. The cost of registration for all
other attendees will be $95, which includes lunch. We are contacting several other
public agencies that might want to co-sponsor this event with us.
Huntington Beach was selected because the Council Chamber can seat 200. Save-
the-date cards have already been mailed, with registration brochures to be mailed on
September 22. For further information, contact Michelle Tuchman, Director of
Communications, 714 593-7120.
Out of the Office
I will be out of the office between October 4 and October 24, on vacation—followed by
a conference in Washington, DC. Blake Anderson will be in charge during my
absence. If you need to contact me, my assistant Jean Tappan has my itinerary.
If you would like additional information on any of the above items, please call me.
Donald ntyre
General Manager
DFM:jt
N% Go1Av.wImcrApGM1EREnS TO Me 6wxmseo ooc
Attachments
00
Tri =TAC SCAP
SOUTHERN CALIFORNIA ALLIANCE Or
PUBLICLY OWNED TREATMENT WORKS
September 10, 1999
Todd Thompson
State Water Resources Control Board
901 P Street
Sacramento, CA 95814
SUBJECT: Comments on the Draft Statewide General Waste Discharge
Requirements and the Draft Environmental Impact Report
Dear Mr. Thompson,
The California Association of Sanitation Agencies (CASA), Tri-TAC, and the
Southern California Alliance of Publicly Owned Treatment Works (SCAP),
(collectively, the Associations) are California-based associations of public
wastewater collection and treatment agencies. CASA represents 87 member
agencies, both large and small, that collectively serve some 15 million
Californians. Tri-TAC is a technical advisory committee representing California
municipal wastewater management agencies that together treat and reclaim
more than two billion gallons of wastewater each day. Tri-TAC is sponsored by
the League of Cities, CASA, and the California Water Environment Association.
SCAP is a non-profit professional organization representing 52 member
agencies in southern California. The Associations' mission is to work with
regional, state, and federal regulatory agencies on matters relating to publicly-
owned treatment works (POTWs). Their goal is to improve the overall
effectiveness of environmental programs and ensure that regulations affecting
POTWs in California are reasonable and in the public's best interest.
The Associations appreciate this opportunity to review and comment on the
Statewide Biosolids General Order and its associated Draft Environmental
Impact Report (EIR). This letter is being sent to demonstrate the Associations'
support for the State Water Resources Control Board's (SWRCB) effort to
develop a reasonable, science-based General Order that will allow for the
continued land application of biosolids in an environmentally safe manner without
overly burdensome regulatory requirements.
Todd Thompson '
Page 2
September 10, 1999
Biosolids reuse has been shown to be a positive environmental force that is strongly
encouraged by the USEPA and environmental groups that look at the whole
environmental picture. It is the only fertilizer/soil amendment application process that
requires agronomic rates of nitrogen application to prevent groundwater nitrate
contamination - one of the major water quality issues in California. Biosolids reuse
reduces the waste of organic matter and rapid filling of our landfills. The SWRCB
should continue to support responsible biosolids reuse with science-based efforts such
as the General Order and EIR.
The Associations agree strongly with the California Environmental Quality Act (CEQA),
which states that "[a]rgument, speculation, unsubstantiated opinion or narrative,
evidence which is clearly inaccurate or erroneous, or evidence of social or economic
impacts which do not contribute to, or are not caused by, physical impacts on the
environment, is not substantial evidence. Substantial evidence shall include facts,
reasonable assumptions predicated upon facts, and expert opinion supported by facts."
The Associations strongly believe that there is no substantial evidence, in light of the
whole record, that biosolids land application will have a significant adverse effect on
the environment. The Associations believe that the Final EIR should conclude that
the opponent's concerns related to biosolids land application are based on
distorted/inaccurate public perception and not scientific facts.
According to CEQA, the SWRCB's regulatory requirements in the General Order must
be based on substantial evidence and not on negative public perception of biosolids
recycling. Thus, all references to public perception concerns should be deleted from
the Draft General Order. The SWRCB should refrain from imposing requirements
without a scientific basis except where science may not apply and best professional
judgment would be appropriate. For instance, best professional judgment may be
appropriate for establishing requirements related to nuisance prevention, such as
buffer zones and housekeeping requirements. Any subjective requirements should
also be avoided.
The Associations continue to recommend that the SWRCB limit the applicability of the
General Order to only Class A and Class B biosolids, and adopt a waiver process for
Exceptional Quality (EQ) biosolids similar to that adopted by the Central Valley
Regional Water Quality Control Board. As currently written, the Draft General Order
will subject the use of biosolids compost and other EQ biosolids "products" to this
permit, potentially resulting in a marketing disadvantage for those high quality products.
Such an economic disadvantage may ultimately thwart efforts to create and reuse
higher quality biosolids. If the SWRCB intends to maintain this overly inclusive
approach, the potential environmental impact of increased regulation of EQ biosolids
needs to be studied as a part of the EIR scoping process.
Todd Thompson
Page 3
September 10, 1999
The Associations, on behalf of their member agencies, respectfully submit the attached
comments on the Draft General Order and the Draft EIR for your consideration during
the development of the General Order and Final EIR. Should you have any questions,
please contact Layne Baroldi at (714) 593-7456.
'
�Zaynf T. Baroldi Michael D. Moore Ann Briggs
CASA Land Subcommittee Tri-TAC Land Committee SCAP Biosolids Committee
Chair Co-Chair Co-Chair
LB:wh
H:%WP.DTA%TS'aM5 9AROLDILWIR&ag.DOC
c: James M. Stubchaer, SWRCB Board Chair
Mary Jane Forster, SWRCB Board Member
John W. Brown, SWRCB Board Member
Arthur G. Baggett, Jr., SWRCB Board Member
Michael D. Rushton, Jones and Stokes
Michael F. Dillon, CASA Executive Director
Steven Majoewsky, CASA President
Phil Bobel, Tri-TAC Chair
Michael D. Moore, Tri-TAC Land Committee Co-Chair
Robert Gillette, Tri-TAC Land Committee Co-Chair
Layne T. Baroldi, CASA Land Committee Chair
Ann Briggs, SCAP Biosolids Committee Co-Chair
Mike Sullivan, SCAP Biosolids Committee Co-Chair
Gt�art�c i
�ARo�O(
�6. M• MwrZ
A UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
��Wn► REGION IX
75 Hawthorne Simi
San Francisco,CA 94105
SEP 10
Glenn A. Barnhill
Special Projects Division Chief
Planning Department,Resource Management Agency
2700"M"Street, Suite 100
Bakersfield,CA 93301-2323
Re: Consultation Process on Proposed Negative Declaration for Biosolids Ordinance (County of
Kern (R0027))
Dear Mr. Barnhill:
This letter summarizes the United States Environmental Protection Agency(USEPA)
comments on Kern County's proposed biosolids ordinance. USEPA supports local oversight of
biosolids application and we believe County agencies are best placed to implement biosolids
regulations. However,we also believe the beneficial use of biosolids is an extremely important
part of wastewater management,and local ordinances should encourage responsible use.
Therefore we urge you to consider adopting a biosolids ordinance that is not unduly restrictive,
given the many levels of protection already present in Kern County. We have outlined some of
those levels of protection below.
USEPA incorporated numerous safety factors into our biosolids standards in 40 CFR 503,
such as evaluating the risk to someone who eats 200 milligrams per day of biosolids every day
for 70 years. While there have been no documented cases of environmental problems when
biosolids are applied in compliance with the standards,a number of recently published papers
challenge the standards under various worst-case scenarios(for example uptake of pollutants
from high metal-content biosolids by leafy vegetable food crops in highly acidic soils).In most
cases, the exposure pathways in question were not the limiting pathways for the pollutants,and
even if the numbers used in these pathway are revised,these would not become the limiting
pathway and our final pollutant limits would not change.
While USEPA's standards address reasonable worst case scenarios,there are a number of
additional degrees of safety now in place in Kern County:
-Kern County's original ordinance allows for application of biosolids meeting the"ceiling
concentration"(cable 1)pollutant limits. The biosolids now being applied in Kern County have
I
pollutant concentrations well under both the ceiling concentration limits and the more stringent
(Table 3)limits required for"exceptional quality"biosolids. In fact,most have concentrations
that are less than 113 of the exceptional quality (Table 3)limit. These low concentrations are due
to effective industrial pretreatment programs which have succeeded in removing significant
amounts of metals from waste streams,prior to discharge to the municipal sewer system.
-all the biosolids now being applied in Kem County meet the "exceptional quality"criteria for
vector attraction reduction (vector attraction reduction is achieved before leaving the wastewater
treatment plant).
-the soils in Kem County are not highly acidic, so concerns raised regarding pollutant migration
in highly acidic soils are not relevant here.
-in most of the areas where biosolids are being applied,there is a large depth to groundwater, so
even if biosolids were overapplied,they would not threaten groundwater.
-biosolids are being applied to land used for feed and fiber crops, as opposed to food crops.
Most of the land receiving biosolids are very marginal and will never be used for food crops such
as leafy vegetables.
-USEPA's site and harvesting restrictions for Class B biosolids (those that have achieved a
significant level of pathogen reduction but not complete pathogen elimination)were designed to
to account for rates of pathogen die-off in moist,humid areas of the country. The and conditions
in Kem County should ensure much more rapid pathogen die-off rates.
The proposed ordinance would only allow for application of "exceptional quality"
biosolids; i.e. biosolids which meet three criteria: the most stringent pollutant concentrations in
40 CFR 503 (fable 3), a vector attraction reduction (VAR) level achieved at the wastewater
treatment plant (as opposed to in the field), and"Class A" (complete)pathogen reduction. As
noted above, all the biosolids now being applied on unincorporated lands in Kem County meet
the Table 3 pollutant criteria, and it is the goal of our Office's pretreatment program to see these
levels upheld. While your original ordinance would have allowed biosolids exceeding these
limits, we would look favorably on an ordinance which requires biosolids to meet the Table 3
limits. The treatment plants applying biosolids in Kem County also run their stabilization
processes to meet VAR criteria at the plant.
To achieve the third criterion for"exceptional quality biosolids", biosolids which have
already been treated at the wastewater plant to significantly reduce pathogens to"Class B"levels
must be treated further to fully reduce pathogens to"Class A"levels. (This has traditionally been
done by composting or long-term drying,but there are several other processes on the market
now.)
Obviously, Class A levels must be achieved if the product is going to be used directly on
food crops or in a home garden. However, when biosolids are used for non-food crops in areas
not used by the general public,the environmental costs of achieving Class A levels may
outweigh the benefits in the following ways: .
i transport of biosolids to compost or other treatment facilities operations and then from
the facility to the land application areas substantially increases overall vehicular traffic.
-most Class A treatment processes reduce nitrogen levels considerably,reducing the
fertilizer value of the biosolids.
- a few Class A processes actually add metals or other pollutants as part of the treatment
process, increasing the concentration in the final product.
- some Class A processes consume significant amounts of energy.
If Kern County chooses to ban application of Class B biosolids, the Southern California
municipalities now applying in Kem County will have to choose between treatment to Class A or
other more expensive and environmentally questionable alternatives: hauling further distances (in
many cases, through Kern County),or adding organic,nitrogen-rich material to landfills.
Biosolids which are Class B with respect to pathogens and which are otherwise
exceptional quality are now being used to enhance marginal agricultural lands in Kern County.
If the farmers do not have access to these biosolids,they may opt to reclaim lands with manures
or other waste-derived soil amendments that do not receive the same level of regulatory
oversight, or choose not to reclaim these marginal areas.
We urge you to consider an ordinance which allows for Class B, otherwise exceptional
quality biosolids on sites subject to approval by the County's Resource Management Agency
(RMA). In deciding whether to approve a site for use of Class B biosolids, the RMA could then
factor in the criteria of concern, such as whether public access restrictions are adequate,if the
land will be used for food crops in the near future or ever, if there is shallow groundwater at the
site, if there are endangered or threatened species in the vicinity that would be adversely
impacted by the application, and whether there are aesthetic concerns at the site in question. The
RMA has already put a considerable amount of work into an ordinance that would address these
question, and this effort should be continued.
As you know,the California State Water Resources Control Board is now developing a
General Order for Biosolids that will also provide additional degrees of safety for biosolids
applications. It addresses tracking for background soils quality, nutrient balancing, addressing _
plant phytotoxicity and impacts to special status biological species, and provides the means to
ensure public access restrictions.
Our office is sending the RMA and the County Counsel our database on pollutant levels,
pathogen and vector attraction reduction and toxic organic pollutants in biosolids which are
applied in Kern County, and would be glad to assist the County in any way with obtaining data
on these treatment plants' biosolids operations and quality,and on their compliance with the
Federal standards.
- I would be glad to discuss this issue further with you at your convenience. I can be
reached at(415)744-1905. Technical questions can be addressed to Lauren Fondahl of my staff
at (415) 744-1909.
Sincerely,11/ ,,f/J�//(�/
�C7"— `�^ 'Me2,,t
Daniel A.Meer,Chief
Office of Clean Water Act Compliance
cc: Jim Stahl,Los Angeles County Sanitation Districts
Raymond Kearney,City of Los Angeles
Blake Anderson, Orange County Sanitation Districts
Paul Giboney,Kern Food Growers Against Sewage Sludge
Karen Miller,US Fish and Wildlife Service
I>,-(V20 C r r , �,-
PMONTHLY UPDATE
SOUTHERN CAUFORNIAALLIN CE OF PUBLICLY ONINED TREATMENT WORKS
Seotem er. 1999
Upcoming Meetings A Message from the Executive Director...
Air Quality Meeting—Wednesday, And in the end, it was $60 worth of oranges and
September 15, 1999 from 10 a.m. to grapefruit that provided the final clues that solved the
12 noon at LACSD. mystery.
Board of Directors —TBA Most of our membership is probably aware that several
miles of beaches in Huntington Beach —'Surf City" —had
Biosolids Committee —TBA been closed to the public since July 1. Many of you are also
aware that, up until a few days ago, a leaking sewer system
Water Issues Committee —TBA was the primary suspect in a conundrum that baffled some
of the best brains in sewerdom. As those of you that live or
work in Orange Country already know, this issue bumped
coverage of the proposed El Toro Airport off the front page. And that's no small feat since the money
spent by both sides of the airport issue is starting to equal its actual construction cost. But I digress.
In the paragraphs following this column, OCSD's Blake Anderson provides a summary of what
occurred during these last three months, which for much of it, must have seemed like"The Huntington
Beach Witch Project" - supernatural forces must have been at work because they kept looking and
looking and couldn't find any problem with the sewer system.
Obviously, a lot more than $60 was spent trying to find the source of the problem, which as we go to
press, does seem to be because of non-point sources flowing out of the Talbert Marsh. Much of this
cost, however, such as cleaning and inspecting sewer lines, is money well spent in that a very thorough
cleaning and inspection benefits everyone. But for the merchants whose business was decimated by
the lack of beachgoers, and for the City, which has seen its image as the premier beach sports center
tarnished, there is no comfort in that thought. And for OCSD, an organization that is an acknowledged
leader in our industry and is respected for its extensive work with environmental groups, it must seem a
particularly cruel blow to have "guilty until proven innocent" accepted without question by most of those
observing the situation.
Upon examination, it is the introduction of AB411 that caused this to go from a small beach closure
over a matter of perhaps days, to one which lasted for two months and encompassed miles of shoreline
during the most popular time period of the year. There is then, as Blake notes, two legitimate questions
to be raised: What set of standards are appropriate to maintain public health and maintain reasonable
public access to their beaches? The District and other ocean discharging POTWs are getting together
to question whether AB 411 needs to be amended. The second question is: Should dry weather
nuisance flows be diverted into the sanitary sewer system along the coast?
And while many of you will read the following story and grin at the irony of oranges being so intrinsic
to solving the mystery of the polluted beach; I also find great irony that the bugs that will affect us the
most this year may not be those that lurk in the recesses of our computers. No, it is the ones that lurk in
3029D RANCHO 1AEJ0 ROAD,SUITE 113 . SAN JUAN CAPISTRANO.CA 92675 . PHONE 19191 4 8 9-76 7 6 . FAX (94914890150
Monthly Update 2 September, 1999
poorly constructed legislation and in the ubiquitous runoff that fouls the mouths of creeks and rivers
throughout the Southland that may end up being the greater concern.
Entomologically yours,
Ray Miller
Water
Most Beaches Reopened — Non-Point Pollution Caused Closure
As we went to press, Blake Anderson, Assistant General Manager of Orange County Sanitation
District and a member of SCAP's Board of Directors, supplied us with this account of the events
surrounding the extended closure of a large portion of the beach in Huntington Beach:
Beginning in mid-June, elevated bacteria levels were seen along a portion of the beach near the
outlet of the Santa Ana River. At first, because of the total and fecal coliform levels, it looked like the
profile of a sewage problem. OCSD then began a wide scale investigation, initially concentrating on
the sewage system serving the State Park system (beach restrooms, restaurants). Failing to find a
problem here, but still realizing increasing bacteria (enterococcus) counts, officials from the Orange
County Department of Health Services began closing portions of the beach on July 1 — by the end of
August, 4.5 miles of the beach were restricted.
The search was expanded to include the City's local sewer system and then ultimately, the District's
84" coastal main line that runs parallel to Pacific Coast Highway. To examine this line, the District
diverted flow through a temporary bypass they constructed, and used physical and closed circuit
television inspection. Again, nothing was found. In the course of the investigation, the District would
use, in addition to the above two techniques, groundwater analysis and ground penetrating radar to
conduct inspections of an ever widening area of the collection system. The conclusion: the systems
examined were sound and incapable of leaking.
During the last week of August, attention turned to the Talbert Marsh, which drains into the ocean in
the vicinity of where the high bacteria counts occurred. Four things then happened:
♦ Discovered high bacteria counts from stormwater pump stations operated by the City of
Huntington Beach and the County of Orange.
• Construction dewatering from a nearby hotel project increased flow to the marsh by t million
gallons per day.
♦ In June, the County of Orange redredged the exit channel from the marsh, allowing it to empty
into the surf zone.
♦ Using $60 worth of oranges and grapefruit, OCSD demonstrated that the ocean currents brought
flow from this area right to the center of the hot spot of highest bacterial readings.
Monthly Update 3 September, 1999
Temporarily, the construction dewatering flow and the non-point nuisance flows are being diverted to
the District's system. Since that time, bacterial counts are down to the cleanest levels in months.
Another issue that played a major role in the situation was AB411. This legislation, which requires
health officials to not only post a warning if even a single water sample exceeds standards for total or
fecal coliform or enterococcus, also provides that the beach be closed if sewage is suspected as the
cause of a high reading. It should be noted that at the time the majority of beaches were closed, the
total and feral coliforms levels had dropped significantly, however the level and distribution of
enterococcus levels continued to grow.
To provide some measure of the effect of AB411. OCSD examined sampling results from June 1998
through August 1999. While that analysis had not been completed by press time, preliminary
indications were that under the old standards, there would have been 5 exceedances. Had AB411
standards been applied effective June 1998, there would
SCAP Welcomes New Members have been 100 exceedances.
Big Bear Area Regional Wastewater Proposed NPDES Permitting Subcommittee Meets at
Agency, the City of Riverside and Inland CASA Meeting
Empire Utilities Agency were welcomed
into the SCAP family. Water Chair Bob Ghirelli arranged for several SCAP
Big Bear Area Regional Wastewater member agency representatives to meet with Larry Walker
Agency will be represented by Steve (Larry Walker&Associates) on August 12, to discuss the
Schindler. formation of a permitting subcommittee similar to one that
was set up within the Bay Area Dischargers Authority. LWA
The City will be represented by Gail designed and implemented a computer database that
Briggs McPherson. catalogues the varying types and sizes of discharges,
watersheds and receiving waters, expiration and renewal
Inland Empire Utilities Agency will be dates and permit conditions that are contained within the
represented by Rich Atwater. NPDES permits received by their member agencies.
Welcome! Bob noted that the SCAP area covers 6 RWQCBs in
Southern California, and many POTWs are often left to their
own devices to deal with complex issues with their Regional Board. The Subcommittee would provide a
forum for the people with responsibility for negotiating and ensuring permit compliance. An opportunity
to team with others, share ideas and strategies and reduce complexity would also be provided.
Members in attendance were very supportive of this concept and a proposal will be developed further
to be brought to the Board of Directors for their consideration.
Small Victory Won in State 303(d1f305(b) Lawsuit
The lawsuit that challenges the validity of the Impaired Water Body Listing (303d) and Water Quality
Assessment Reports (305b) moved ahead in our favor when the judge denied a request by
environmental interveners who asked that the previous 305(b) reports from 1975 be included in the
Administrative Record. The judge said that each report stood alone and could not be placed in the
record en mass.
Monthly Update 4 September, 1999
Motions for Summary Judgement have been filed on two issues: The first concerns the
"underground regulations" issue, where we contend that the State's use of informal guidelines violated
the Administrative Procedures Act. The second questions whether the State followed Clean Water Act
requirements when producing the 305(b) Report.
Biosolids
Synagro Obtains Court Permission to Temporarily Continue to Operate Biosolids Facilitv
Last month, Synagro Technologies was ordered to cease the importation of biosolids and bulking agents to their
Riverside County facility due to odor complaints received from residents of a nearby housing development.
Several SCAP member agencies send their biosolids to this site for processing.
Under a 1996 Conditional Use Permit negotiated
with the Riverside County Department of Co-Chairs Appointed to Biosolids Committee
Environmental Health's Local Enforcement Agency,
Synagro agreed to reduce or cease operations at Anne Briggs of Eastern Municipal Water District and
their site in the event LEA staff substantiated that the Mike Sullivan of Los Angeles County Sanitation
odors complained of by the residents originated at District have agreed to act as co-chairs of the SOAP
their facility. On July 13, Synagro had been ordered Biosolids Committee.
to reduce operations from 500 tons per day of Anne can be reached at(909) 928-3777 and Mike
biosolids received, down l0 250 tpd; by July 27, 1999 is available at (562) 699-7411 x2824. Thank you
they were down to 0. Anne and Mlkel
Synagro disobeyed the order and kept accepting
biosolids; filing a request for a restraining order against the County. On August 3, a temporary restraining order
was granted, allowing them to resume their 500 tpd operations. At an August 31 hearing however, the Judge
reduced this level down to 2501pd, but delayed his final decision. The final decision is expected within 30 days.
Draft Statewide Biosolids EIR Review Comments Due November 9
Comments on the draft Statewide Biosolids EIR, which assesses the environmental impacts of the
revised waste discharge requirements being proposed by the SWRCB for land application of biosolids in
California, are due at the state by Tuesday, November 9. SCAP members are working with CASA/Tri-
TAC to coordinate comments on the draft document. The draft EIR identifies "environmentally superior
alternatives"and recommends extensive mitigation measures in order to reduce potential impacts to
less than significant.
Public hearings have been conducted on the EIR in Palmdale, Bakersfield and Sacramento. The
meetings were sparsely attended. However, opposition to biosolids applications was voiced at all
meetings.
Kem County Biosolids Ordinance Status
A public hearing on the Negative Declaration for the proposed Biosolids Ordinance will be held on
Tuesday, October 5 by the Kern Board of Supervisors. There is the possibility that the Board could take
action on October 12 to approve the Biosolids Ordinance, which would severely restrict the type of
biosolids that can be applied, and impose significant new fees. SCAP Biosolids Committee members
are reviewing options they can pursue to address these issues.
Monthly Update 5 September, 1999
Air
New Wrinkle in Risk Management Program
A recently enacted Senate bill (S880) affects three areas of the federal RMP regarding accidental
releases of hazardous materials:
♦ Propane removed from Risk Management List —While propane is no longer on the federal list,
digester gas may still be covered due to CalARP regulations (up to OES and/or the local AAs);
definitely covered under OSHA's PSM program.
♦ To reduce the risk from terrorist obtaining sensitive information, data submitted in the RMP will not
be available under the Freedom of Information Act (FOIA) for one year.
♦ Each facility covered by the RMP regulations must hold a public meeting by February 1, 2000 to
describe and discuss the local implications of the RMP that was submitted on June 21, 1999. The
facility operator must certify to the FBI by June 5, 2000 that such a meeting has been held.
SCAP Portable Equipment Permitting Workshop Explains Key Issues
Portable equipment, that is any equipment that is not attached to a foundation or that doesn't remain
at a single location for more than 12 consecutive months and is self-propelled, is subject to regulation
by the California Air Resources Board (CARB). This includes non-road engines such as outdoor power
equipment, recreational, farm, construction, and lawn and garden equipment; as well as marine vessels,
locomotives and aircraft. Also included are land-based Part 89 diesel engines and small <25 hp spark
ignition engines (large spark-ignition engines are not regulated, however units larger than 50 hp that
were manufactured prior to 1990 will not be allowed to be used at all).
The CARB statewide program issues permits that are valid for three consecutive years and covers
engines and equipment separately, and requires that CARB be notified when the engine is moved, even
to another spot within your facility. Because new and old engines must meet the most stringent
standards, it is anticipated that retrofits or replacements will be required.
It was noted that any units larger than 50 hp should be registered with CARB to avoid permitting
issues with the SCAQMD. The cost of permitting these engines through the state is 1/3 the AQMD's
fee. Also noted was that if SCAQMD has already permitted an engine of yours, and you operate it
longer than five consecutive days at a single location, it may trigger an environmental justice action
against your agency.
Copies of the presentation handouts from the workshop are available from the SCAP office.
Non Sequitur
"You can employ men and hire hands to work for you, but you must win their hearts to have them
work with you."
- Tioho
THE KIPLINGER WASHINGTON LETTER
Cimd",d makiy m bwima limb Al 1923—Hd.T6,Na 33
THE KIPUNGER WASHWGTON EDITORS
1729 H SL,NW,Wad:mgmo DC 20D06-3939
Dear Client: Washington, Aug. 20, 1999
Droughts come 6 go, but water issues will constantly get tougher.
r Water is a big concern for industry: Agriculture. Paper mills.
Food processing. Electric power. Residential development. Chemicals.
Cost and availability issues ripple through the national economy.
I
1 Water will cost more. ..up about 6% a year over the next 10 years.
Why? Rising demand due to population growth and the steady flow
i of Americans to water-guzzling suburbs and water-short Sunbelt states.
By 2020, the U.S. will use about 9 billion more gallons of water per day.
Shrinking supplies as salt water seeps into coastal aquifers
and as environmental fears curb new dam construction, end use of old ones.
Aging infrastructure will need $325 billion in upgrades by 2020.
And costly Rov't regulations: Safe drinking water standards.
Fish and wildlife protections. Preservation of scenic rivers. And more.
Conflicts over water will escalate in both number and intensity.
Farmers will be squaring off against users who want to tap "their" water.
Environmentalists vs. developers. State vs. state. Rural vs. urban.
Fla. and the West will be the focus of the most-heated fights.
A dozen Fla. counties, Calif., Colo., Nev., Ariz. are already embroiled.
i Mid- and S.E. Atlantic, New England, Southern Plains will be next
as periodic droughts and escalating environmental curbs strain supplies.
Water shortages will curb growth in some Sunbelt communities.
Public waterworks will be sold or outsourced.. .operations shifted
to private companies rather than having govlt agencies do needed upgrades.
Private operators figure they can consolidate several smaller utilities,
capture efficiencies of scale and turn a profit despite regulated rates.
Contractors service Atlanta and other cities, and most N.J. residents.
Some private firms are betting on the future deregulation of water
and opportunities for profit. . .following path of natural gas, electricity.
Tiered fees will catch on. Higher for peak seasons, big users.
iAnd water trading, both on an emergency basis and routinely.
Surplus areas will bank, sell and ship water to regions with shortfalls.
Plus interlocking water-supply networks, similar to power grids,
which will allow easy transfers of water, especially within water basins.
Reuse of water will be encouraged, even rewired, by local govIts.
Capturing, purifying storm water. Separate pipelines for recycled water.
New conservation and reuse technologies will emerge, be adopted.
Better filters to catch impurities. Desalinating using electrodialysis.
Water purification with ultraviolet radiation and use of bioremediation.
Low-pressure drip irrigation. Cleaning systems that use air, not water.
Bottom line: Big changes in how water is used, sold, regulated.
M1 bMPx/Nalslmx®mbWewgbPMl�pWxw,7„",�, ad6011�'I aall6[ @6m0154se6i,Fa�iT
pM1xlVbla"m lma nexx x"xw oc�®wwbx,a,m,"wam FAeaa YIN1"lfNl: a.mlflda2 i4 ffi1a®1&
Nawsa Ya.AumP"M1 xppxwMut rar m,r.usm FwN xb,@Rpiwmn:s Ml9N wcYA'q"mi
Strong demand for U.S. waterworks equipment abroad. . .good market
for everything from pumps and drilling gear to water treatment supplies.
In Latin America, Mexico, Peru and Ecuador are among countries
with big plans to improve their water systems. Also, Trinidad 6 Tobago.
In the Middle East, Saudi Arabia wants new desalination plants
ready by 105. Bahrain seeks recycling. Syria plans irrigation systems.
And elsewhere. . .India will be focused on wastewater treatment..
Ditto for Spain and Indonesia. Algeria will up spending on irrigation.
Bottled-water sales will sumo 10% this year to $4.3 billion. . .
over 13 gallons per American per year. Gains will be about 7% annually
now to 104. It's the fastest-growing part of U.S. beverage industry.
U.S. bottled-water exports will tog $100 million in a few years,
from $80 million now. Top customers: Canada, Japan, Bahamas, Bermuda,
Colombia, Brazil, Hong Kong, Singapore and S. Korea. Long-term growth
will be in Asia and Latin America as incomes in those areas rise.
An u date on Drospects for key
in American economies:
Me co will lead the region, gg about 3.5% next year.
That will fo ow 3% expansion in 199, ks largely to trade w U.S.
and U.S. investment in auto, car partsparel and electroni plants.
Brazil i Pullingout of a recon. ..will grow 2% X in 2000.
Devaluation is bo ting exports of fards, electronic , aerospace.
Ar entina w 1 sta in the souown 3% in '9 and a 1% drop
in 2000. Investors try about Oct. eions and po Bible devaluation.
Russia and China oast of a neliance. .exchanging bear hugs.
Raises concern about a coa tion aimedount ing U.S. interests.Both resent rise in .S. owerce iet Union bit the dust.
And they strongly opposed NAT action slavia's Kosovo province.
China doesn't want similar "oude inrence" in Taiwan or Tibet.Russia has the same concerns ae i deaith rebels in the Caucasus.But lop -standin disa ree tl chill their relationshi
despite warm official pronouncements Border disputes are unsettled,
Chinese are migrating to Siberia a R sians fear a stronger China.
Russia's weakness makes it play unacc armed second fiddle to China.
Trade between the two a ittan considering the potential
of a resource-rich Russia and a labor-rich inn. Deals with the U.S.
dwarf China's trade with Ru is, which is too oor to buy from anyone.
Fact is economic ealit kegs both f m becoming too hostile.
Outlook for wiZe, sales and services is ad this year.
The ski indu will boost advertisingto em sagging sales.
It will be targets to 35-to-50-y ear-
olds, who pack t ick wallets.
Snowboard will lead a ui went sales. ..dowahil ski sales flat.
New twin-tipped erformance skis and supershort skis wil gain market.
Cross ount skim will be strong, including re rt packages.
But weak a pment sales...folks renting or staying with wh they have.
S bile sales will be off a ain.. .the fourth year a row.
UnZ—Good
d will dip below 230,000 this winter, down from 260,0 in '97.
nowblower sales million, half what was spent in '9 '96.
deals for winter clothing shoppers because of compecit n
ampliers. Nearly everything will be waterproof and breathable.
New fabrics will make for warmer, lighter and easier-to-store garments.
California Regional Water Quality Control Board -
Santa Ana Region
'Winston H.Hkkaz inn el Admen: evplly-wwswce.a govi-.w9c68 Cm'mvs
Se.'je, 3737 Main Soot S.lw500,81venode,Cali fomia 93501-3339C�p �S
En r"onal'. Phone(909)1824130 3 FAX(909)791 fi388
P'h""oa — 13oMD Lo t-rEL
-GN taV"l
_y AcSg
- V 111=0
September 10, 1999
Assembly Member Scott Baugh Assembly Member Ken Maddox
67' Assembly District 68' Assembly District
State Capitol State Capitol
Sacramento, CA 95814 Sacramento, CA 95814
Assembly Member Lou Correa Assembly Member Marilyn Brewer
69'n Assembly District 70"Assembly District
State Capitol State Capitol
Sacramento, CA 95814 Sacramento, CA 95814
Assembly Member Bill Campbell Assembly Member Dick Ackerman
710 Assembly District 72ne Assembly District
State Capitol State Capitol
Sacramento, CA 95814 Sacramento, CA 95814
Assembly Member Patricia Bates
73' Assembly District
Stale Capitol
Sacramento, CA 95814
RE: NPDES ORDER NO. 99.11, GENERAL WASTE DISCHARGE
REQUIREMENTS FOR CONCENTRATED ANIMAL FEEDING OPERATIONS
(CAFOs) WITHIN THE SANTA ANA REGION
Dear Honorable Ladies and Gentlemen:
Thank you for your August 19, 1999 letter concerning the consideration of tentative
Board Order No. 99-11, general waste discharge requirements for concentrated animal
feeding operations (mainly dairies) within the Santa Ana Region, by the Regional Board
on August 20, 1999. We appreciate your interest in this very important matter, and we
applaud the commitment expressed in your letter of ensuring that the water being
consumed by your constituents and neighbors is of the highest quality possible.
The Regional Board adopted Order No. 99-11 and Cease and Desist Order No. 99-65
at their meeting on August 20". Order No. 99-11 contains a number of important
provisions necessary to bring the Chino Basin dairy industry into compliance with the
California Environmental Protection Agency
Honorable Members of the Assembly - 2 - September 10. 1999
Santa Ana Region Basin Plan and state and federal law. The Order includes a
prohibition on the use of manure within the Santa Ana Region wherever ambient water
quality does not meet the water quality standards established in the Basin Plan
(necessary for the Order to be in compliance with the California Water Code). It also
includes a requirement that all CAFOs within the Region must prepare and implement
an approved Engineered Waste Management Plan that identifies how each facility will
retain waste products on site in conformance with Order No. 99-11. Another provision
of the Order is that all manure generated at each facility must be removed within 180
days of being removed from corrals. In addition, Order No. 99-65 requires that
previously stockpiled dairy wastes be removed from facilities by the end of 2001.
Order No. 99-11 contains a number of provisions that have been included in previous
dairy waste discharge requirements, as well as a number of new requirements. The
industry has not established a very good track record of compliance with previous
discharge requirements, and we expect that this new Order will provide additional
challenges to CAFO operators. However, there should be no question that the Order,
as adopted, is necessary for compliance with both federal and state laws. In fact, at the
hearing to consider Order No. 99-11. both the Western United Dairymen and the Milk
Producers Council expressed support for the Order, with the exception of the 2-year
requirement to remove previously stockpiled manure from facilities.
Over the years, dairies have increased the concentrations of dairy animals per acre
within the basin to the point where they no longer have adequate acreage to properly
manage their waste products. The following information illustrates that point. Data
included in monitoring reports that the CAFOs are required to transmit to the Regional
Board revealed that during 1997, the number of dairies in the Chino Basin declined by
ten percent. However, during that same period, the number of dairy cattle within the
basin actually increased by ten percent.
Further, for about one-third of the Chino Basin dairies, the absence of adequate flood
control infrastructure makes compliance with water quality regulations very difficult.
This situation has come about with the intense development in the Ontario and Rancho
Cucamonga areas, from which storm water runoff is tributary to the dairy area. As
these areas have developed, flood control infrastructure has lagged far behind. The
local jurisdictions have begun to take some steps to rectify this situation, but much more
needs to be done before enough storm water runoff is diverted from the dairy areas to
allow storm water management control at all individual facilities to become effective.
Finally, staff appreciates the Legislature's augmentation of resources for the State and
Regional Boards to address our backlog of inspections. This will allow us to provide
increased compliance assistance to CAFOs, and appropriate enforcement, when
necessary. Again, thank you for your interest in this very important matter. Please
California Environmental Protection Agency
j Rnn d'd Pr.Re.
Honorable Members of the Assembly - 3 - September 10, 1999
contact me at (909) 782-3284 with any questions or comments concerning CAFOs
within the Santa Ana Region.
Sincerely,
Ger'84 J. Thibeault
Executive Officer
cc. Regional Board
Winston Hickox, Cal/EPA
Walt Pettit, Executive Director, SWRCB
Alexis Strauss, U.S. EPA
Dan Meer, U.S. EPA
Bob Feenstra, Milk Producers Council
Gary Conover, Western United Dairymen
John Borges, Western United Dairymen
B2Bill ills, Orange County Water District
v Anderson, Orange County Sanitation District
V)
California Environmental Protection Agency
101 Rrcickd Papn
BOARD OF DIRECTORS MebngDaW To ad.of Dr.
9/22/99
AGENDA REPORT Item Nu.W !e R rn
L Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Bill Aldridge, Principal Accountant
SUBJECT: PAYMENT OF CLAIMS OF THE ORANGE COUNTY SANITATION
DISTRICT
GENERAL MANAGER'S RECOMMENDATION
Ratify Payment of Claims of the District by Roll Call Vote.
SUMMARY
See attached listing.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
® This item has been budgeted. (Line item: N/A)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
14aM'Vaalwp OaVnS}VUW[Ne1VRFILEStlaimspnq We
asu.a ExAe Page 1
ATTACHMENTS
a 1. Copies of Claims Paid reports from 8/1/99 — 8/15/99 & 8/16/99—8/31/99.
BA
NMmWYa1Wp.CteNn41'PUWnEpe�WPFILESYIebnepeN.bc
nerleen erxAe Page 2
Claims Paid From 811199 to 8116199
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
21194 RPI/Bio Gro 8 120.056.30 Residuals Removal MO 4-26-95
21195 Bristol Systems,Inc. 30.997.50 Consulting Services-Y2K Project
21196 Burch Ford 70,408.80 4 1999 Ford Taunts LX
21197 Carollo Engineers 67.431.53 Engineering Services-P2-43.3,J-254&Document Mgmt.Project
21198 Cooper Energy Services 68,459.38 Engine Supplies
21199 Duke Energy Trading&Marketing,L.L.C. 71,151.30 Natural Gas-Spec#P-170
21200 Kaiser Foundation Health Plan 25,179.84 Medical Insurance Premium
21201 Kemiron Pacific, Inc. 36,722.63 Ferric Chloride MO 9-27-95
21202 Lincoln-Recp Fullerton OPCO,L.L.C. 83,412.94 Connection Fee Refund
21203 Nickey Petroleum Co., Inc. 49,991.77 LubricantlDiesel Fuel
21204 Pima Gro Systems,Inc. 60,715.05 Residuals Removal MO 3-29-95
21205 Ryland Homes Group of Southern CA 91.922.00 Connection Fee Refund
21206 Science Applications Intl.,Corp. 97,319.75 Ocean Monitoring MO 6-8-94
21207 Southern Calif Coastal Water Research 56,500.00 Research Project
21208 Southern California Edison 72,694.33 Power
21209 Stang Industrial Products 59,779.70 Digester Cleaning Monitor System
21210 SPEC Services, Inc. 259,159.24 Engineering Services J-33-1
21211 Tule Ranch/Magan Farms 69.334.72 Residuals Removal MO 3-29-95
21212 Union Dodge 43,756.20 2 1999 Dodge Quad Cab
21213 V&A Consulting Engineers 27,640.53 Engineering Services-Corrosion Assessment Study Phase II
21214 Ark Construction Company 41,952.29 Construction P1-444
21215 KPRS Construction Services, Inc. 248,768.40 Construction P2-65
21216 American Telephone&Telegraph Corp. 2.031.27 Long Distance Telephone Service
21217 A Tint of Glass 75.00 Window Tinting
21218 Advanced Engine Tech Corp. 172.50 Consulting Services-Emissions Monitoring Systems
21219 Air Liquids America Corporation 3,477.36 Specialty Gasses
21220 Airborne Express 21.75 Air Freight
21221 Allied Electronics,Inc. 183.99 Electrical Supplies
21222 Allied Supply Company 6.069.66 Mechanical Parts&Supplies
21223 Allied Systems/Supply Co. 5.384.19 Mechanical Pans&Supplies
21224 American Airlines 12.968.39 Travel Services
21225 American Computer&Comm. 149.00 Computer Equipment Maint.
21226 Ponton Industries 377.13 Instrument Parts&Supplies
21227 Analysts,Inc. 1,660.69 Testing Kits
21228 Anthony Pest Control, Inc. 600.00 Service Agreement-Pest Control
21229 Applied Industrial Technology 101.70 Electrical Parts&Supplies
21230 Amror Vac Sweeping Service 520.00 Vacuum Truck Services
21231 Asbury Environmental Services 120.00 Waste Oil Removal
21232 Associated Readymix Concrete 334.83 Concrete
21233 ASR Analysis 890.00 Vibration Analysis 5-41-1
Page 1 of 8
Claims Paid From 811199 to 8115/99
Warrant No. Vendor Amount Description
21234 American Telephone&Telegraph Corp. 437.71 Telephone Service
21235 American Telephone&Telegraph Corp. 21.66 Telephone Service
21236 AT&T Wireless Service 3,970.37 Cellular Telephone Service
21237 AT&T Wireless Service 3,012.06 Cellular Telephone Service
21238 AWSI 133.00 Department of Transportation Training Program
21239 Barnes&Noble Books 146.68 Publication
21240 Battelle-Northwest 14,816.00 Contract Services-Soil Testing
21241 Battery Specialties 1,374.12 Batteries
21242 BicMerleux Vitek, Inc. 10,935.24 Lab Supplies
21243 BioSpheriwl Instruments, Inc. 201.65 Instrument Mainl.
212" Black Box Corporation 835.65 Computer Supplies
21245 Boise Radiator Service 86.00 Truck Repairs
21246 Brizina&Associates 136.42 Lab Supplies
21247 Calif Centrifugal Pump 1.780.00 Pump Supplies
21248 California Auto Refrigeration Dist., Inc. 727.91 Service Agreement
21249 California Automatic Gate 149.48 Service Agreement
21250 California Relocation Services, Inc. 236.25 Moving Services
21251 Calolympic Safety 90.63 Safety Supplies
21252 Airgas Dry Ice 43.10 Lab Supplies
21253 Centropointe Commercial Interiors 1.684.82 Office Furniture
21254 Charles P.Crowley Co. 131.52 Instrument Parts
21255 City of Fountain Valley 15.648.88 Water Use
21256 Clayton Group Services, Inc. 1,760.69 Professional Services-Ergonomic
21267 Cole Scientific 77.34 Lab Services
21258 Compensation&Benefit Assn of San Diego 685.00 Subscription
21259 Compressor Components Of California 1,293.00 Pump Supplies
21280 Computers America,Inc. 1,607.76 Computer Supplies
21261 Consolidated Elect. Distributors,Inc. 1,387.71 Electrical Supplies
21262 Continental-McLaughlin 94.57 Hardware
21283 Corporate Express 2,317.44 Office Supplies
21264 Corporate Image Maintenance, Inc. 13,995.00 Custodial Services Spec.No.9899-09
21265 Cotelligent 2.320.75 Professional Services-Computer
21268 County of Orange 35.00 Permit Fees
21267 County Wholesale Electric Co. 408.40 Electrical Supplies
21208 Cytec Industries 2.413.39 Anionic Polymer Spec.No. 9798-18
21269 CEM Corporation 1,425.60 Lab Supplies
21270 CMS, Inc. 4.364.60 Investigation Service
21271 CPI-The Alternative Supplier, Inc. 140.46 Lab Supplies
21272 CR&R,Inc. 1.910.00 Container Rentals
21273 CWEA Membership 1.235.00 Membership
21274 Day-Timers,Inc. 27.74 Office Supplies
Page 2 of 8
Claims Paid From BMI99 to 8116199
Warrant No. Vendor Amount Description
21275 Del Mar Analytical 3,306.00 Biosolids Analysis
21278 Dell Direct Sales L.P. 3,231.43 2 Computer Workstations
21277 Delta Foam Products 118.18 Lab Supplies
21278 DeZurlk C/O Misco/SouthWest 7,631.39 Valves
21279 Don Meurer 8.300.00 Consulting Service-Ocean Monitoring Program
21280 DMG-Maximus 2,200.00 Professional Services-Cost Allocation Plan
21281 Electronic Transmission Smog System 18.90 Electrical Supplies
21282 Enchanter, Inc. 4,900.00 Ocean Monitoring MO 5-24-95
21283 Environmental Resources Associates 1,032.80 Lab Supplies
21284 ENS Resources,Inc. 4,321.32 Professional Services-Legislative
21285 Fast Company 19.75 Subscription
21286 Faxpress, Inc. 258.98 Office Supplies
21287 FedEx Corporation 190.46 Air Freight
21288 Fibertron 5,679.64 Fiber Optic Cable
21289 Fisher Scientific Company,L.L.C. 8,720.49 Lab Supplies
21290 Forma Systems,Inc. 6.280.00 Professional Services-Geographical Information System Project
21291 Fountain Valley Camara 13.74 Photo Supplies
21292 Fountain Valley Rancho Auto Wash, Inc. 352.50 Truck Wash Tickets
21293 Franklin Covey 62.60 Office Supplies
21294 Fry's Electronics 388.56 Computer Supplies
21295 City of Fullerton 358.11 Water Use
21296 General Electric Supply Company 174.74 Electric Parts
21297 Garratt-Callahan Company 2.395.55 Chemicals
21298 Gates Fiberglass Installers 998.87 Fiberglass Repair
21299 GTE California 1,807.05 Telephone Services
21300 Gefinge Castle 487.00 Lab Equipment Maintenance
21301 Gierich-Mitchell, Inc. 1,892.32 Belt, Filter Press Supplies
21302 Glenn's Tackle Shop 724.55 Lab Supplies
21303 WW Grainger,Inc. 1,180.36 Compressor Supplies
21304 Graybar Electric Company 425.62 Electrical Supplies
21305 Great Western Sanitary Supplies 733.01 Janitorial Supplies
21308 Hacker Equipment Company 812.11 Truck Supplies
21307 Harold Primrose Ice 96.00 Ice For Samples
21308 Harvard Business Review 95.00 Subscription
21309 Hatch 8 Kirk,Inc. 176.63 Truck Supplies
21310 Hewlett-Packard 1,712.73 Lab Supplies
21311 HIM,Inc. 381.66 Toole
21312 Hoffman Southwest Corporation 450.00 Maint.Services-Sewer Cleaning
21313 Home Depot 26.64 Small Hardware
21314 Hopkins Technical Products 310.93 Pump Supplies
21315 City of Huntington Beach 11.686.89 Water Use
Page 3 of 8
Claims Paid From 811199 to 8115/99
Warrant No. Vendor Amount Description
21316 Imaging Plus,Inc. 487.23 Office Supplies
21317 StateNet 400.00 Online Service
21318 Inorganic Ventures, Inc. 188.27 Lab Supplies
21319 Irvine Photo Graphics 5.58 Photographic Services
21320 Irvine Ranch Water District 22.64 Water Use
21321 Airgas Direct Ind-IPCO Safety Div. 157.76 Safety Supplies
21322 Jay's Catering 466.04 Catering Services
21323 Jensen Instrument Co. 910.62 Instrument Supplies
21324 Johnstone Supply 2,453.37 Electrical Supplies
21325 Joint Instrumentation Committee 180.00 Registration
21326 Kabbara Engineering 3,446.60 Professional Services-Traffic Control
21327 Industrial Distribution Group 3,166.91 Tools
21328 Lab Support 3,994.94 Temporary Employment Services
21329 LaserAll Corp. 1,149.51 Printer Service Agreement
21330 Lee&Ro,Inc. 7,177.36 Engineering Consulting Services-MO 12-8-94
21331 Lord Fleming Architects, Inc. 1.868.44 Architectural Services
21332 MacDonald-Stephens Engineers,Inc. 16,117.38 Engineering Services 2-37
21333 Maintenance Products, Inc. 2,519.21 Mechanical Supplies
21334 Mandolin Publishing 195.00 Subscription
21335 Mar Vac Electronics 41.07 Instrument Supplies
21338 MasTec Network Services 5.000.00 Communication Service
21337 Mc Junkin Corp—Ontario Branch 1,085.47 Plumbing Supplies
21338 McMaster-Cart Supply Co. 1.118.54 Tools
21339 Michael Tumipseed&Associates 6,000.00 Professional Service-Tule Ranch Site Study
21340 Midway Mfg&Machining Co. 684.99 Mechanical Repairs
21341 Mission Uniform Service 3,566.52 Uniform Rentals
21342 Motion Industries 324.73 Pump Supplies
21343 MotoPhoto 75.15 Photographic Services
21344 Nasco 292.54 Instrument Supplies
21345 National Plant Services, Inc. 3,700.00 Vacuum Truck Services
21346 Neal Supply Co. 2,476.30 Plumbing Supplies
21347 Oceans'99 495.00 Subscription
21348 Office Depot Business Services Div. 1,726.93 Office Supplies
21349 Optic Software 15.575.00 Document Design Service
21350 Orange Coast Pipe Supply 124.94 Plumbing Supplies
21351 Orange County Vector Control District 1.578.82 Pest Control
21352 Orange County Wholesale Electric,Inc. 134.29 Electrical Supplies
21353 Orange Valve&Fitting Company 457.01 Fillings
21354 Osftech 309.00 Computer Supplies
21355 Oxygen Service Company 1.580.29 Specialty Gases
21358 OCB Reprographics 20,818.42 Printing Service-Spec P-173
Page 4 of 8
Claims Paid From 811/99 to 0/15199
Warrant No. Vendor Amount Description
21357 Pacific Bell 18.93 Telephone Services
21358 Pacific Bell Internet Services 324.00 Internet Service
21359 Padflc Mechanical Supply 214.59 Plumbing Supplies
21360 Parkhouse Tire Co. 2,162.13 Tires
21361 Parts Unlimited 837.57 Truck Supplies
21362 Paulus Engineering,Inc. 8,899.28 Engineering Service-Sewer Repair
21363 The Perkin Elmer Corp. 2,182.18 Filters
21364 Pius Hut of America,Inc. 291.00 Catering Services
21366 Polydyne,Inc. 24,203.08 Cationic Polymer MO 3-11-92
21368 Powerware 34.72 Publication
21367 Primary Source 12,408.68 Office Furniture
21366 Quad Knopf,Inc. 1,209.40 Professional Services-Tule Ranch Site Study
21389 COS,L.L.C. 258.82 Investment Management Program Service
21370 Reliastar 7.808.00 Employee Medical Health Premium
21371 Reliastar Bankers Security Life Ins. 5.041.16 Life Insurance Premium
21372 Remedy Temp 3,138.54 Temporary Employment Services
21373 RPM Electric Motors 1,165.07 Electric Motor Repair
21374 IRS Hughes Co, Inc. 65.72 Paint Supplies
21375 Safelite Glass Corp. 362.78 Auto Supplies
21376 Santa Fe Industrial Products,Inc. 296.58 Mechanical Supplies
21377 Schwing America,Inc. 8,794.19 Pump Supplies
21378 Sea-Bird Electronics,Inc. 490.00 Lab Repairs
21379 Seavisual Consulting, Inc. 5,060.86 Professional Services-Ocean OuHall Instrumentation
21380 Second-Sun 803.92 Light Fixtures
21381 Sewer Equipment Co.of Florida, Inc. 1,003.50 Sewer Pipe Supplies
21382 Shamrock Supply Co.,Inc. 898.77 Toole
21383 Shepherd Machinery Co. 349.37 Truck Supplies
21384 Shopping.Com 28.41 Communication Equipment
21385 Shureluck Sales 8 Engineering 37.00 Tools/Hardware
21386 Siemon, Larsen 8 Marsh 1.000.00 Professional Services-Santa Ana River Watershed Group
21387 Supelco,Inc. 1,260.48 Lab Supplies
21388 Smith Pipe 3 Supply,Inc. 185.32 Plumbing Supplies
21389 So.Col.Gas Company 640.97 Natural Gas
21390 SoftView Computer Products 399.30 Computer Supplies
21391 SoltCholce 3,463.55 Software
21392 South Coast Air Quality Management Dist. 310.20 Emission Fees
21393 Sperling Instruments,Inc. 1,012.64 Meter
21394 Starbuck Truck Refinishing,Inc. 606.00 Painting Service
21395 State Board Of Equalization 288.00 Hazardous Waste Fee
21396 StudioVisia 13,520.00 Computer Consulting Services
21397 Summit Steel 2,117.44 Metal
Page 6 of 8
Claims Paid From 811199 to 8115199
Warrant No. Vendor Amount Description
21398 Sunset Ford 159.30 Truck Supplies
21399 Sunset Industrial Parts 22.61 Mechanical Supplies
21400 Solar Turbines, Inc. 1,539.49 Mechanical Parts&Supplies
21401 Taylor-Dunn 6,412.88 Electric Cart Parts
21402 Telemedia, Inc. 797.75 Training Software
21403 Thomas Gray&Assoc. 330.00 Biosolids Analysis
21404 Thompson Industrial Supply,Inc. 199.60 Mechanical Supplies
21405 Time Wainer Communications 40.47 Cable Services
21406 Tony's Look&Safe Service&Sales 28.02 Locks&Keys
21407 Tri-State Seminar On-the-River 80.00 Seminar Registration
21408 Tropical Plaza Nursery, Inc. 1,800.00 Contract Groundskeeping MO 5-11-94
21409 Truck&Auto Supply,Inc. 252.91 Truck Supplies
21410 Truesdell Laboratories, Inc. 130.00 Lab Services
21411 Ultra Scientific 216.73 Lab Supplies
21412 Union Bank of California 1,443.73 Banking Services
21413 United Parcel Service 42.92 Parcel Services
21414 Unocal 76 92.59 Fuel for Vehicles-Contract 3-38-3
21415 Urban Water Institute, Inc. 350.00 Registration
21416 Valley Cities Supply Company 2,340.86 Plumbing Supplies
21417 Veme's Plumbing 460.00 Plumbing Supplies
21418 Village Nurseries 48.99 Landscaping Supplies
21419 VCl Mechanical 385.00 Line Leak Detector Installation
21420 VWR Scientific Products Corporation 6,723.30 Lab Supplies
21421 Waters Corporation 495.00 Subscription
21422 West Coast Safety Supply Co. 5,990.90 Safety Supplies
21423 Western States Chemical, Inc. 17,660.77 Caustic Soda MO 8-23-95
21424 Wiley-VCH Veriag GmbH 135.96 Publication
21425 Wirth Gas Equipment Co. 7,759.91 Instrument Supplies
21426 Xerox Corporation 15,035.18 Copier Leases
21427 3T Equipment Company 16,283.88 Mechanical Pans&Supplies
21428 Brown&Caldwell 21.408.85 Engineering Service Pt-37
21429 Systems Integrated 5,115.75 Construction Services J-31-3
21430 Thomas M.Flanagan 158.23 Meefingrrmining Expense Reimb.
21431 Roland T. McReynolds 274.59 Meeting/Training Expense Reimb.
21432 Daniel R.Tremblay 1.684.95 Meetingrrmining Expense Reimb.
21433 County of Orange 465.00 Sewer Service Fees Admin.
21434 Orange County Sanitation District 1,472.91 Petty Cash Reimb.
21435 County of Orange-Auditor Controller 374.00 Underground Storage Health Service Fee
21436 Orange County Sanitation District 455,176.36 Payroll EFT Reimbursement
21437 A-Plus Systems 4,977.32 Notices&Ads
21438 American Training Resources,Inc. 479.49 Training Materials
Page 6 of 8
Claims Paid From 8/1/99 to 8/16199
Warrant No. Vendor Amount Description
21439 American Telephone 6 Telegraph Corp. 47.78 Telephone Service
21440 Court Order 479.00 Wage Garnishment
21441 Builders Book, Inc. 290.87 Publication
21442 Caesars Palace 1,657.89 Membership
21443 Court Order 581.00 Wage Garnishment
214" Colvis Industries 670.00 Reconciliation User Fee Refund
21445 CASA 180.00 Conference Registration
21446 CPI-The Alternative Supplier, Inc. 22.38 Lab Supplies-Freight
21447 Court Order 611.07 Wage Garnishment
21448 Friend of the Court 339.50 Wage Garnishment
21449 GTE California 539.42 Telephone Services
21450 Oak Fabco/Industrial Steam 2.828.92 Pump Supplies
21451 Intl Union of Oper Eng AFL-CIO Loral 601 1.702.89 Dues Deduction
21452 Airgas Direct Ind-IPCO Safety DM. 862.48 Safety Supplies
21453 Mar Vac Electronics 34.21 Instrument Supplies
21454 Mid-West Associates 13,024.34 Pump Supplies
21455 MSA-C/O Geoff Cobbeft 160.00 Membership
21456 National Technology Transfer, Inc. 200.00 Registration-Mechanical Training
21457 New Horizons Computer Learning Center 490.00 Training Registration-Computer
21458 Orange County Family Support 498.50 Wage Garnishment
21459 Orange County Marshal 110.00 Wage Garnishment
21460 Orange Valve 8 Fitting Company 338.38 Fittings
21461 Orrick,Herrington 8 Sutcliffe 2.000.00 Professional Service-Bond Counsel
21462 OCEA 609.02 Dues Deduction
21483 Court Order 40.00 Wage Garnishment
21464 Court Order 296.00 Wage Garnishment
21465 Peace Officers Council of CA 810.00 Dues Deduction
21466 Red Valve Company, Inc. 2,160.05 Mechanical Supplies
21467 So.Cal.Gas Company 367.26 Natural Gas
21468 Southern California Edison 9,239.75 Power
21469 Southern California Edison 7,835.35 Power
21470 Sparling Instruments.Inc. 250.00 Meter
21471 State of California 142.10 Wage Garnishment
21472 Summit Steel 554.67 Metal
21473 United Way 307.63 Employee Contributions
21474 1999 Energy Efficiency Forum 890.00 Membership
21475 Layne T.Baroldi 245.73 Meeting?raining Expense Reimb.
21476 David A.Ludwin 460.00 Meetingrrraining Expense Reimb.
21477 Douglas M.Stewart 545.00 Meetingrrraining Expense Reimb.
21478 Jonathan K.Thomsic 190.41 Meeting/Training Expense Reimb.
21479 Charles F.Winsor 1,007.67 Meetingrrmining Expense Reimb.
Page 7 of 8
Claims Paid From 811199 to 0115199
Warrant No. Vendor Amount Description
21480 James L.Wybenga 248,07 Meeting?raining Expense Reimb.
21481 Orange County Sanitation District 3,941.00 Workers Camp. Reimb.
Total Accounts Payable-Warrants $ 2,823,713.41
Payroll Disbursements
15181 -15370 Employee Paychecks $ 257,420.31 Biweekly Payroll 8/11199
40397-40833 Direct Deposit Statements 644.732.08 Biweekly Payroll 8/11199
Total Payroll Disbursements $ 902,152.37
Wire Transfer Payments
Chase Bank of Texas National Association $ 151,140.59 August Interest Payment on 1993 Certificate of Participation
Chase Bank of Texas National Association 161,339.98 August Interest Payment on 1990.92 Series A Certificate of Participation
State Street Bank&Trust Co.of Ca. 133.056.63 August Interest Payment on 1990-92 Series C Certificate of Participation
Chase Bank of Texas National Association 2,509,554.79 Semiannual Principal&Interest Payment an 1990-92 Series A COP
Chase Bank of Texas National Association 361.528.76 Semiannual Principal&Interest Payment on 1993 COP
State Street Bank&Trust Co.of Ca. 2,206,575.90 Semiannual Principal&Interest Payment on 1990-92 Series C COP
Total Wire Transfer Payments $ 5,523,196.63
Total Claims Paid 811199-8115199 $ 9,249,062.41
Page 8 of 8
Claims Paid From 8M 6/99 to 8131/99
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
21482 Great American Printing Co. $ 3,029.59 Tools
21483 Aldco Systems, Inc. 2,487.30 Electrical Supplies
21484 Air Cold Supply 42.68 Air Conditioner Repairs
21486 Air Products&Chemicals 23,451.95 0&M Agreement Oxy Gen Sys MO 8-8-89
21486 Alrbome Express 89.70 Air Freight
21487 Alabama Poultry&Egg Association 150.00 Registration
21488 AVR:Audio Video Reporting Services 108.00 Subscription
21489 Allied Supply 3,555.00 Registration
21490 Ambience Unlimited 200.00 Raggedy Ann&Andy-Kids Day
21491 American Compensation Assoc. 25.00 Membership
21492 American Public Works Association 100.00 Membership
21493 Anchor Paving 2,400.00 Manhole Repair
21494 Anicom, Inc. 1,265.85 Electrical Parts&Supplies
21495 Anthony Pest Control, Inc. 180.00 Service Agreement-Pest Control
21496 Appleone Employment Service 8,344.50 Temporary Employment Services
21497 Armor Vac Sweeping Service 487.00 Vacuum Truck Services
21498 Arrs Disposal Service, Inc. 928.72 Waste Removal
21499 Atiands Pool Care 235.00 Service Agreement
21500 ABB Go Harold Wells Associates 4,501.39 Electrical Parts&Supplies
21601 AMA 395.00 Registration
21502 Westland Engineering C/O API BASCO 1,195.55 Mechanical Supplies
21503 ASAE 210.50 Publication
21504 ASR Analysis 782.00 Vibration Analysis 5-41-1
21505 American Telephone&Telegraph Corp. 44.91 Telephone Service
21606 Bailey,Fisher&Porter Company 760.00 Electrical Equipment Maint.
21507 Bar Tech Telecom, Incorporated 2,150.00 Telephone Installation
21508 Barclays Law Publishers 60.00 Subscription
21509 Battery Specialties 632.79 Batteries
21510 Bauer Compressors 1,247.62 Safety Equipment Testing
21511 Ben Meadows Company, Inc. 19.45 Lab Supplies
21512 Beta Technology,Inc. 2.580.37 Electrical Parts&Supplies
21513 Black&Veatch L.L.P. 20,645.42 Engineering Services-Can Gen Operating Philosophy Study
21514 Brinderson Corp. 2.170.00 Fuel Management Maint.Service
21515 Bristol Systems,Inc. 11.603.76 Consulting Services-Y2K Project
21516 Business Objects Users Conference 1.690.00 Registration
21517 Buy.Com 2.608.76 Computer Supplies
21518 BOC Edwards 803.36 Lab Supplies
21519 Cal Protection 989.00 Electrical Services
21520 California Automatic Gale 1.657.28 Service Agreement
21521 Camp Dresser&McKee, Inc. 6.229.78 Legal Service-Cartel
Page 1 of 8
Claims Paid From 8/16/99 to 8131199
Warrant No. Vendor Amount Description
21622 Carleton Engineers 8 Consultants, Inc. 2.668.50 Engineering Services-Air Quality
21523 Carlton V. Philips,Jr. 90.00 Legal Service-Porter Plating
21524 Centrepointe Commercial Interlors 2,752.90 Office Furniture
21525 Chemical Transfer Company, Inc. 47.20 Freight
21526 Cincinnati Incorporated 3,001.00 Mechanical Pans&Supplies
21527 Compu Master 249.00 Registration
21528 Consolidated Elect. Distributors,Inc. 38.18 Electrical Supplies
21529 Converse Consultants 2,894.80 Consulting Services 6-12
21530 Corporate Express 1,520.64 Office Supplies
21531 Corporate Image Maintenance,Inc. 12,110.00 Custodial Services Spec. No.9899-09
21532 Coat Containment Solutions 424.90 Worker's Comp.Services
21533 Cotelllgent 480.00 Professional Services-Computer
21634 Counterpart Enterprises,Inc. 1,796.43 Mechanical Parts 8 Supplies
21535 County of Orange-Auditor Controller 802.46 Communication Equipment Repair
21536 County Wholesale Electric Co. 22.09 Electrical Supplies
21537 Culligan of Orange County 30.00 Soft Water Service
21538 CEM Corporation 311.40 Lab Supplies
21539 CH2MHIII 8,881.00 Engineering Services-Sulfide Control Demonstration Project
21540 CPI: California Pipeline Inspection 5.928.00 CCTV Inspection of Beach Sewers
21541 CR 5 R, Inc. 1.260.00 Container Rentals
21542 CWEA Annual Conference 220.00 Conference Registration
21543 Daily Pilot 100.00 Notices 8 Ads
21544 Dee Jaspers&Assoc. 4,543.46 Legal Services-Cartel
21545 Del Mar Analytical 248.00 Biosolids Analysis
21546 Dell Direct Sales L.P. 21.334.51 10 Computer Workstations
21547 DaZurik C/O Misco/SouthWest 129.30 Valves
21548 Doorl America 670.00 Permit Fee Refund
21540 Thyssen Dover Elevator 2,532.67 Elevator Maintenance
21560 Embarcadero Technologies,Inc. 2.282.75 Software Maint.Agreement
21651 Enchanter,Inc. 4,900.00 Ocean Monitoring MO 5-24-95
21662 FedFx Corporation 76.57 Air Freight
21553 Flbertron 755.00 Fiber Optic Cable
21554 Fidelity Graphic Products 48.00 Office Supplies
21656 First American Title Insurance Company 400.00 Legal Service-Documentation
21556 Fisher Scientific Company,L.L.C. 2,484.90 Lab Supplies
21557 Flo-Systems, Inc. 585.97 Pump Supplies
21558 Forestry Suppliers 52.57 Lab Supplies
21559 Fountain Valley Camera 81.08 Photo Supplies
21560 Fountain Valley Rancho Auto Wash, Inc. 695.00 Truck Wash Tickets
21561 Fry's Electronics 707.98 Computer Supplies
21562 Ganahl Lumber Company 400.09 Lumber/Hardware
Page 2 of 8
Claims Paid From 8116199 to 8131199
Warrant No. Vendor Amount Description
21663 GTE California 6.455.46 Telephone Services
21564 Gigs Information Group, Inc. 15,099.00 Membership
21565 Glenn's Tackle Shop 74.27 Lab Supplies
21566 Graseby S.T.I. 566.00 Engine Supplies
21567 Greylur Electric Company 5.261.46 Electrical Supplies
21568 H.R.Macklin&Sons, Inc. 4.000.00 Professional Service-Land Appraisal
21569 Hamilton Company 277.20 Lab Supplies
21570 Harold Primrose Ice 96.00 Ice For Samples
21671 Hoffman Southwest Corporation 3.081.36 Maim.Services-Sewer Cleaning
21572 The Holman Group 705.74 Employee Assistance Program Premium
21573 Home Depot 246.19 Small Hardware
21574 Horizon High Reach 3,900.00 Safety Compliance Training
21575 Hydrotex . 4,476.69 Luba Oil
21576 Industrial Air Compressor 778.22 Equipment Rental
21577 Industrial Threaded Products, Inc. 219.33 Mechanical Parts&Supplies
21578 Information Resources 710.00 Personnel Services
21579 Irvine Photo Graphics 34.73 Photographic Services
21680 Irvine Ranch Water District 47.46 Water Use
21581 IBM Corp. 2,093.80 Maint.Agreement
21582 IBM Corporation 10,000.00 Professional Service-Internet Vulnerability
21583 Airgas Direct Intl-IPCO Safety Div. $05.68 Safety Supplies
21584 ISATECH11999 525.00 Registration
21585 ISI lnfortext 1,652.80 Subscription
21586 J&B Auto Parts 45.06 Auto Parts&Supplies
21687 J.O'Brien Company, Inc. 854.22 Computer Supplies
21588 J.D.Edwards World Solutions Company 1,530.00 Registration-Technical Integration&Upgrade
21689 Jamison Engineering,Inc. 1,199.25 Misc.Construction Services
21590 Jay's Catering 2.712.84 Catering Services
21591 Jobs Available, Inc. 515.20 Notices&Ads
21592 Johnstone Supply 20.50 Electrical Supplies
21593 K.P.Lindstrom,Inc. 2.082.33 Environmental Consulting Services MO 12-9-90
21594 Kelly Paper 78.34 Paper
21595 Industrial Distribution Group 683.07 Tools
21596 Lab Support 8,138.47 Temporary Employment Services
21597 Labware, Inc. 1.500.00 Registration
21598 LaserAll Corp. 50.00 Primer Service Agreement
21599 Lee Valley Tools 877.85 Tools
21600 L.euis-Nexis 474.03 Books&Publications
21601 Linkage, Inc. 5,680.00 Training Registration
21602 Long Beach Line-X 1,059.59 Truck Supplies
21603 Lord Fleming Architects, Inc. 300.00 Architectural Services
Page 3 of 8
Claims Paid From 8/16/99 to 8131/99
Warrant No. Vendor Amount Description
21604 Los Angeles Times 603AO Notices&Ads
21605 Luca's 95.00 Meeting Expense
21606 Maintenance Technology Corp. 350.66 Welding Supplies
21607 McGarry Central 1,209.00 Office Equipment Maintenance Agreement
21608 Medlin Controls Co. 563.80 Instrument Supplies
21609 Mission Uniform Service 3,585.07 Uniform Rentals
21610 Mitchell Instrument Co. 3,061.00 Instruments
21611 Moreland&Associates 1,180.00 Auditing Services MO 3-8-95
21612 Motion Industnes 292.36 Pump Supplies
21613 MotoPhoto 236.15 Photographic Services
21614 National Plant Services, Inc. 17,036.00 Vacuum Truck Services
21615 Network Installation Corporation 1.830.40 Office Equipment Earthquake Reinforcement
21618 Nickey Petroleum Co., Inc. 804.02 LubncanUDiesel Fuel
21617 Ninyo&Moore 1,661.25 Professional Services-Materials Testing MO 6.24-98
21616 The Norco Companies 140.00 Mail Delivery Service
21619 NAB Associates, Inc. 1.447.00 Lab Services
21620 Office Depot Business Services Div. 1.062.50 Office Supplies
21621 OhmarUVEGA Corp. 3,865.46 Instrument Maint. Service
21622 Orange Coast Pipe Supply 12.29 Plumbing Supplies
21623 Orange County Sanitation District 9,359.09 Payroll EFT Reimbursement
21624 Orange County Wholesale Electric, Inc. 33825 Electrical Supplies
21625 Orrick, Herrington&Sutcliffe 2,000.00 Professional Service-Bond Counsel
21826 Oxygen Service Company 1.328.64 Specialty Gases
21627 P.L. Hawn Company, Inc. 210.11 Electrical Supplies
21628 Pacific Bell 47.84 Telephone Services
21629 Pacific Mechanical Supply 287.99 Plumbing Supplies
21830 Pagenst 1,652.84 Rental Equipment
21631 The Perkin Elmer Corp. 1,844.00 Filters
21632 Petco Animal Supplies,Inc. 32.28 Lab Supplies
21633 Polydyne, Inc. 22,138.77 Cationic Polymer MO 3-11-92
21634 Port Supply 163.78 Rope
21635 Power Lift Corporation 1,100.00 On-Site Forklift Safety Training
21636 Precision Backhoe 995.00 Equipment Rental
21637 Presidium, Inc. 2,083.33 Worker's Comp. Claims Admin.
21638 Quad Knopf,Inc. 2,131.30 Professional Services-Tule Ranch Site Study
21639 Quality Building Supply 264.40 Landscaping Supplies
21640 R.L.Abbott&Associates 4,000.00 Kem County Biosolids Consulting Services
21641 Rainbow Disposal Co., Inc. 2,393.48 Trash Removal
21642 Rainin Instrument Co., Inc. 334.98 Lab Supplies
21643 Reliastar Bankers Security Life Ins. 5,084.94 Life Insurance Premium
21644 Rockhurst College Continuing Education 195.00 Registration
Page 4 of 8
Claims Paid From 8/16199 to 8131199
Warrant No. Vendor Amount Description
21645 RPM Electric Motors 5,818.65 Electric Motor Repair
21646 RS Hughes Co, Inc. 684.99 Paint Supplies
21647 Saratoga Institute 927.93 Publication
21648 Schneider Electric 5.296.60 Software Maint.Agreement
21649 Schwing America, Inc. 333.88 Pump Supplies
21650 Scientific Refrigeration 2,244.65 Refrigerator Repair
21651 Scott Specialty Gases, Inc. 180.37 Specialty Gases
21652 City of Seal Beach 126.68 Water Use
21653 Sears Industrial Sales 530.14 Mechanical Supplies
21654 Second-Sun 411.99 Light Fixtures
21655 Shamrock Supply Co.,Inc. 214.51 Tools
21656 Shepherd Machinery Co. 157.36 Truck Supplies
21657 Sheraton Harbor 713.02 Registration
21658 Siemon,Larsen 8 Marsh 3.000.00 Professional Services-Santa Ana River Watershed Group
21659 Sierra Automated Valve Services, Inc. 959.01 Plumbing Supplies
21660 SkillPath Seminars 198.00 Training Registration
21661 Voided Check - -
21662 Snap-On Incorporated 92.94 Tools
21663 So.Cal.Gas Company 14.474.94 Natural Gas
21664 SoftView Computer Products 126.57 Computer Supplies
21665 SoftChoice 282.31 Software
21666 South Coast Water 50.00 Water System Maint.Agreement
21667 Starbuck Truck Refinishing,Inc. 1,060.50 Painting Service
21668 Voided Check - -
21669 Sun-Belt Landscape 6 Maintenance 6,945.00 Landscape Maint.
21670 Sunset Industrial Parts 623.02 Mechanical Supplies
21671 Technomic Publishing Company,Inc. 64.13 Publication
21672 The Register 108.00 Notices 8 Ads
21673 Thermo LabSystems,Inc. 6,550.00 Lab Equipment Maint.
21674 Thomas M.Dawes 4,760.00 Professional Services MO 4-23-97
21675 Thompson Industrial Supply, Inc. 473.21 Mechanical Supplies
21678 Tomell 8 Cotten 250.00 Legal Services-Cartel
21677 Tri-State Seminar On-the-River 520.00 Seminar Registration
21678 Truesdail Laboratories, Inc. 180.00 Lab Services
21679 TCH Associates,Inc. 1,886.20 Lab Supplies
21680 U.S.Filter Corporation 1,262.75 Fitters
21681 Ultra Scientific 232.46 Lab Supplies
21682 Underground Service Alert of So. Calif. 25.00 Membership
21683 United Parcel Service 120.08 Parcel Services
21684 Unocal 76 30.90 Fuel for Vehicles-Contract 3-38-1
21685 V 8 A Consulting Engineers 2.308.02 Engineering Services-Corrosion Assessment Study Phase II
Page 5 of 8
Claims Paid From 8/16/99 to 8/31199
Warrant No. Vendor Amount Description
21686 Valley Cities Supply Company 76.14 Plumbing Supplies
21687 Verve's Plumbing 5,860.00 Plumbing Supplies
21688 Vision Service Plan-(CA) 14,716.08 Vision Service Premium
21689 VCI Mechanical 600.00 Electrical Service
21690 VWR Scientific Products Corporation 7,529.30 Lab Supplies
21691 The Wackenhut Corporation 11,928.05 Security Guards
21692 Waters Corporation 4,269.75 Service Agreement-Lab Equipment
21693 Waxie Sanitary Supply 1,389.26 Janitorial Supplies
21694 WeBec'99 e40.00 Registration
21695 Wells Supply Company 173.48 Plumbing Supplies
21696 Wirth Gas Equipment Co. 10.074.02 Instrument Supplies
21697 Xerox Corporation 5,535.87 Copier Leases
21698 Xpedex Paper&Graphics 213.24 Office Supplies
21699 Yokogawa Corp.of America 285.38 Instrument Supplies
21700 3CMA 480.00 Registration
21701 Nicholas J.Arhontes 307.44 Meetingrrraining Expense Reimb.
21702 Robert M.Bell 120.00 Meetingrrraining Expense Reimb.
21703 Pongsakdi Cady 120.00 Meeting/Training Expense Reimb.
21704 Jerry F.Evangelista 370.40 Meeting/Training Expense Relmb.
21705 Chuck Hodge 1,144.92 Meeting/Training Expense Reimb.
21706 Andrei loan 602.53 Meeting/Training Expense Relmb.
21707 Kathleen T. Millea 560.00 Meeting/fraining Expense Reimb.
21708 Sharon Nelius 1,145.05 Meeting?raining Expense Reimb.
21709 So Coast Air Quality Management District 327.80 Registration-Rideshare Program
21710 Henry Lorimer&Fry's Electronics 2,909.24 Employee Computer Loan Program
21711 Jim Elo&Micro Center 2,207.51 Employee Computer Loan Program
21712 League Of California Cities 25.00 Registration
21713 Orange County Sanitation District 932.18 Petty Cash Reimb.
21714 Bernard Construction Company, Inc. 105,982.00 Construction 3-35R&3-11R
21715 Voided Check - -
21716 Cooper Energy Services 26,903.50 Engine Supplies
21717 Delta Dental 41,949.91 Dental Insurance Plan
21718 Fleming Engineering, Inc. 425,269.19 Construction 3-38-1 &7-17
21719 Fortis Benefits Insurance Company 63,828.28 Long Term Disability Ins. Premium
21720 James Martin&Co. 171,658.16 Professional Services-Data Integration Project MO 5/27/98
21721 Kemiron Pacific,Inc. 93,281.19 Fame Chloride MO 9-27-95
21722 Mike Prlich&Sons 111,835.00 Construction 6-12
21723 Palnewebber Incorporated 59,521.57 COP Remarketing Agreement
21724 Pima Gro Systems,Inc. 35,252.29 Residuals Removal MO 3-29-95
21725 Reilastar 26,088.64 Employee Medical Health Premium
21726 Sancon Engineering,Inc. 260,055.00 Construction 2-34R
Page a of 8
Claims Paid From 8/16199 to 8131/99
Warrant No. Vendor Amount Description
21727 Southern California Edison 41,696.37 Power
21728 SCAP 31,226.59 BRSC Assessment Fee&Kem County Expert Witness Expense
21729 Voided Check - -
21730 The Trans Company 25,873.58 Electrical Supplies
21731 Tule Ranch/Magan Farms 41,979.62 Residuals Removal MO 3-29-95
21732 Fleming Engineering, Inc. 137,290.65 Construction 3-38-1
21733 The Vantage Group,L.L.C. 40,256.00 Consulting Services-Source Control Programming Project
21734 Vulcan Chemical Technologies 54.336.81 Hydrogen Peroxide Specification No:C-044
21735 Western Stales Chemical, Inc. 46,875.41 Caustic Soda MO 8-23-95
21738 Woodruff, Spradlin&Smart 77,674.40 Legal Services MO 7-28-95
21737 Reliastar 11,754.92 Employee Medical Health Premium
21738 Boyle Engineering Corporation 25,304.82 Engineering Services 3-38-1 &7-27
21739 Brown&Caldwell 260,761.40 Engineering Services J-35-1 &Pl-37
21740 Environmental Science Associate(ESA) 48,842.25 Professional Services J40-4
21741 Orange County Sanitation District 409.218.28 Payroll EFT Reimbursement
21742 Parsons Engineering Science,Inc. 178,828.82 Engineering Services J42
21743 Pima Gro Systems, Inc. 67,267.22 Residuals Removal MO 3-29-95
21744 Abeam 621.36 Hardware
21746 Airgas Dry Ice 3.10 Lab Supplies
21746 Alternative Dispute Resolution Design Group, Inc. 8,500.00 Training Registration
21747 Bell Pipe&Supply Co. 653.54 Valve Supplies
21748 Court Order 479.00 Wage Garnishment
21749 BNI Building News 720.00 Registration
21750 Carollo Engineers 7,650.19 Engineering Services P1-36-2
21751 Court Order 581.00 Wage Garnishment
21752 Consolidated Elect.Distributors.Inc. 1,852.88 Electrical Supplies
21753 Consulting Psychologists Press 377.19 Training Supplies
21754 Diane Kilpatrick 611.07 Wage Garnishment
21755 DGA Consultants, Inc. 24,495.08 Surveying Services MO 6-8-94
21758 Emergency Management Network, Inc. 900.00 Training Registration
21757 Friend of the Court 339.50 Wage Garnishment
21758 Gartner Group,Inc. 23,400.00 Research Advisory Service
21759 Government Finance Officers Association 450.00 Financial Reporting Review Fee
21760 Harbour Engineering Group 11,700.00 Pump Supplies
21761 Holmes&Narver, Inc. 4.595.55 Engineering Services P144
21762 Industrial Threaded Products, Inc. 346.53 Mechanical Parts&Supplies
21763 Infotec Santa Ana 900.00 Registration
21764 Intl Union of Oper Eng AFL-CIO Local 501 1,688.58 Dues Deduction
21765 Airgas Direct Ind-IPCO Safety Div. 51.64 Safety Supplies
21766 ISATECH/1999 175.00 Registration
21767 Laraine Pipoly and the Law Offices of Mark Plummer 12.000.00 Claim Settlement
Page 7 of 8
Claims Paid From 8/16199 to 8131/99
Warrant No. Vendor Amount Description
21768 MacDonald-Stephens Engineers,Inc. $9.03 Engineering Services 2-37
21769 McMaster-Cart Supply Co. 1.429.01 Tools
21770 National Technology Transfer, Inc. 2,390.00 Registration-Mechanical Training
21771 Oceans'99 100.00 Registration
21772 Orange County Family Support 498.50 Wage Garnishment
21773 Orange County Forum 30.00 Registration
21774 Orange County Marshal 55.00 Wage Garnishment
21775 Orange County Wholesale Electric, Inc. 3.521.69 Electrical Supplies
21776 OCS Reprographics 35.56 Printing Service-Spec P-173
21777 OCEA 612.26 Dues Deduction
21778 Pacific Bell 79.28 Telephone Services
21779 Court Order 40.00 Wage Garnishment
21780 Court Order 296.00 Wage Garnishment
21781 Peace Officers Council of CA $10.00 Dues Deduction
21782 Shureluck Sales&Engineering 4.796.60 Tools/Hardware
21783 Snap-On Incorporated 13.36 Tools
21784 So.Cal.Gas Company 6.44 Natural Gas
21785 South Coast Air Quality Management Dist. 12,956.95 Emission Fees-Plant 1
21788 State of California 134.06 Wage Garnishment
21787 Textile Engineering Associates 510.18 Belt Press Supplies
21788 Foxboro Company 19.76 Instrument Supplies
21789 Thompson Industrial Supply, Inc. 4,346.40 Mechanical Supplies
21790 Tri-State Seminar On-the-River 40.00 Seminar Registration
21791 United Way 307.63 Employee Contributions
21792 Blake Anderson 283.79 Mesting/Training Expense Reimb.
21793 City of Huntington Beach 100.00 Permit Fee-Job No.J-33-1
21794 South Coast Air Quality Management Dist. 18,867.17 Emission Fees-Plant 2
21795 Fleming Engineering,Inc. 137,290.65 Construction 3-38-1
21796 Communications Performance Group,Inc. 17,900.00 Professional Services- Contingency Plans 8 Procedure Project
Total Accounts Payable-Warrants $ 3,733,385.29
Payroll Disbursements
15371 -15504 Employee Paychecks $ 183,988.48 Biweekly Payroll 8/25199
15505.15506 Employee Paychecks 16,278.58 Adjustment&Termination
40634.41271 Direct Deposit Statements 657,938.87 Biweekly Payroll 8125/99
15507-16527 Directors'Paychecks 5,305.62 Payroll 8127199
Total Payroll Disbursements $ 863,511.55
Total Claims Paid 8116199-8131199 $ 4,596,896.84
Page 8 of 8
DRAFT
MINUTES OF SPECIAL STEERING COMMITTEE MEETING
Thursday, August 19, 1999
A meeting of the Steering Committee of the Orange County Sanitation District was
held on Thursday, August 19, 1999 at 3:30 p.m., in the District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS:
Directors Present: OTHERS PRESENT:
Jan Debay, Chair of the Board Thomas L. Woodruff, General Counsel
Pal McGuigan, Chairman, OMTS Committee
North Eckenrode, Chairman, PDC Committee
Tom Saltarelli, Chairman, FAHR Committee STAFF PRESENT:
(via teleconferencing) Don McIntyre, General Manager
John Collins, Past Chairman of the Board Blake Anderson, Asst. General Manager
Jean Tappan, Committee Secretary
Directors Absent:
Peer Swan, Vice Chair
Jim Silva, County Supervisor
(2) CLOSED SESSION
The Committee convened at 4:02 p.m. in Closed Session, pursuant to Government Code Section
54956.9, to discuss two issues as follows:
1. Confer with General Counsel re Orange County Bankruptcy litigation—County of Orange
v. Merrill Lynch, at al. (Government Code Section 54956.9).
2. Confer with General Counsel re Orange County Employees Retirement System (OCERS)
litigation v. County of Orange, Orange County Superior Court Case No. 791315
(Government Code Section 54956.9)
Confidential Minutes of the Closed Session held by the Committee have been prepared in
accordance with California Government Code Section 54957.2 and are maintained by the Board
Secretary in the Official Book of Confidential Minutes of Board and Committee Closed Meetings.
A report of action taken will be publicly reported at the time that the approved action becomes
final re Action Item No. 2(1). No action was taken re Agenda Item No. 2(2).
At 4:50 p.m., the Committee reconvened in regular session.
(3) ADJOURNMENT
The Chair declared the meeting adjourned at 4:50 p.m.
Submitted byr-,
I
44*Tappan
"ring Committee Secretary
.. v
1
DRAFT
MINUTES OF STEERING AND
AD HOC COMMITTEES COMBINED MEETING
Wednesday, August 25, 1999 at 5 p.m.
A meeting of the combined Steering/Ad Hoc Committees of the Orange County
Sanitation District was held on Wednesday, August 25, 1999 at 5 p.m., in the
District's Administrative Office.
(1) The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE MEMBERS: OTHERS PRESENT:
Directors Present: Thomas L. Woodruff, General Counsel
Jan Debay, Chair of the Board Tom Nixon, Woodruff, Spradlin & Smart
Peer Swan, Vice Chair Mike Moore, OCSD Employee
Pat McGuigan, Chair, OMTS Committee Layne Baroldi, OCSO Employee
Norm Eckenrode, Chair, PDC Committee Jeff Bauer, Paine Webber
John Collins, Past Chairman of the Board Don Hughes, Director Silva's Office
Jim Silva, County Supervisor Ryal Wheeler, OCSD Employee
Kris Lindstrom, Environmental Consultant
Directors Absent: Joseph Grindstraff, SAWPA
Tom Saltarelli, Chair, FAHR Committee
STAFF PRESENT:
AD HOC COMMITTEE MEMBERS: Don McIntyre, General Manager
Directors Present: Mike Peterman, Director of Human Resources
John Collins, Committee Chair David Ludwin, Director of Engineering
Jan Debay, Chair of the Board Bob Ghirelli, Director of Technical Services
Peer Swan, Vice Chair Gary Streed, Director of Finance
Pat McGuigan, Chair, OMTS Committee Michelle Tuchman, Director of Communications
Norm Eckenrode, Chair, PDC Committee Jim Herberg, Planning Manager
Jean Tappan, Committee Secretary
Directors Absent:
Tom Saltarelli, Chair, FAHR Committee
Peter Green, Director
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) RECEIVE FILE AND APPROVE MINUTES OF PREVIOUS MEETING
The minutes of the July 21, 1999 Combined Steering and Ad Hoc Committees meeting were approved
as drafted. Director Swan abstained.
V
Minutes of the Combined Steering/Ad Hoc Committees
Meeting
Page 2
August 25, 1999
(5) REPORT OF THE COMMITTEE CHAIR
Chair Jan Debay congratulated Director Swan on his election to the MWD Board, which is effective
September 13, 1999.
(6) REPORT OF THE GENERAL MANAGER
A. Update on Huntington State Beach Closure.
General Manager Don McIntyre reported that the publicity about the beach closure and
our efforts has been accurate because of Director of Communication Michelle
Tuchman's efforts. So far the articles have been better than expected. Mr. McIntyre
announced that television coverage is expected at tonight's Board meeting. About
$350,000 has been expended to dale on the investigation. Staff will be requesting
emergency funding from the Board for modifications to the Coast Trunk sewer-line
siphon.
Director of Technical Services Bob Ghirelli described the background of the beach
closure and ongoing and planned activities in the effort to identify the source. The beach
is now closed from the Santa Ana River to Golden West Street. Representatives from
the City of Huntington Beach staff, Stale Parks, Orange County Health Care Agency,
Regional Water Quality Control Board and OCSD staff are meeting daily. A list of action
items has been developed. The City of Huntington Beach is taking a more active role
and looking more closely at their facilities.
A new State law that went into effect on July 1 establishes lower limits for various
contaminates along the coast. This may result in more frequent and longer closures
than would have been imposed prior to July 1.
B. SAWPA and the State Water Bond Issue.
Joseph Grindstaff, Executive Director of the Santa Ana Watershed Protection Agency
(SAWPA) made a presentation on the SAWPA Plan and how it relates to the State
Water Bond Issue and what changes are being considered for the Agency. The Santa
Ana River watershed is the largest watershed and the largest water supply in southern
California. Therefore, impacts on the watershed affect everyone in the basin. The goal
of the SAWPA Plan is to have three year supply of water stored in the basin. Mr.
Grindstaff described the projects necessary to reach that goal.
Chair Debay mentioned as a 'heads up'that the resolution of support for the GWR
System Project was presented at the last Newport Beach City Council meeting and there
were several dissenters who tied it to growth enhancement.
Another issue is how SAWPA should manage the broader responsibilities of the agency.
One suggestion has been having a Board representative from the County's Board of
Supervisors of each of the three counties in the Santa Ana basin.
Copies of the overviews were requested by Chair Debay.
7
Minutes of the Combined Steering/Ad Hoc Committees
Meeting
Page 3
August 25, 1999
(7) REPORT OF GENERAL COUNSEL
General Counsel Tom Woodruff did not make a report.
(8) STEERING COMMITTEE DISCUSSION ITEMS (Items A-C)
A. Financial Consolidation of Revenue Areas 1, 2, 3, 5, 6, 7, 11, 13 and 14 and for a Single
User Fee Rate Structure.
This item was moved to the September Steering Committee meeting.
B. City of Brea Request for Contribution for Sewer Line Construction to Serve Bexley
Neighborhood Annexation.
Gary Streed discussed the letter request from the City of Brea. The County and City will
be putting in funds and the homeowners will form an assessment district. The request is
for the Sanitation District to providing additional funding and to waive connection fees
because these homeowners have been paying user fees through their property taxes.
This would decrease the homeowners' costs from $600 to $300 per year.
Staff was asked to prepare a report outlining the options available before a policy decision
is made. There are other areas in the County that are in this same situation and in the
past the District has not helped to fund those connections, either through discounted or
waived connection fees. There is some concern that this could be construed as gifts of
public funds. This will be presented to the Steering Committee before forwarding to the
FAHR Committee.
Director Silva will check with County staff to find out how the County will be funding this
program with the City of Brea.
C. The list of agenda items scheduled to be reviewed by the Working Committees in
September were reviewed.
(9) REPORT OF THE AD HOC COMMITTEE CHAIR
Chair John Collins did not make a report.
(10) COMBINED STEERING AND AD HOC COMMITTEES DISCUSSION ITEM
A. The Public Comment Period for the Draft EIR on the Strategic Plan ended on August 16.
There were 23 responses. A synopsis of the comments was prepared by staff and
presented to the Committee members. The Southeast Huntington Beach Homeowners
Assn. has requested that the comment period be extended so that they could address the
issues impacting their neighborhood in more detail, specifically odor control and noise.
Staff prepared a response sheet to the homeowners that addresses their concerns, and
the Ad Hoc Committee members agreed that an extension was not necessary.
A decision will be forthcoming on whether to hold a special meeting to review the final
document. The Directors will be notified as soon as the decision is made.
Minutes of the Combined Steering/Ad Hoc Committees
Meeting
Page 4
August 25, 1999
(11) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There were no other business, communications or supplemental agenda items.
(12) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(13) CONSIDERATION OF UPCOMING MEETINGS
The next Steering Committee meeting is scheduled for Wednesday, September 22, 1999 at 5 p.m.
This will be a combined meeting with the Ad Hoc Committee to review the draft Final EIR that is
scheduled to be considered at the October 27, 1999 regular Board Meeting.
(14) CLOSED SESSION
The Committee convened at 6:15 p.m. in Closed Session to discuss three items, as follows:
1) General Manager's Performance Evaluation for 1996-1999, (Govemment Code Section 54957);
2) Claim of Crow Winthrop Development Ltd. Partnership (Government Code Section
54956.9(b)(3)(C); and 3) Consider initiating litigation concerning regulation of biosolids
(Government Code Section 54956.9(c). Minutes of the Closed Session are on file with the Board
Secretary. The minutes of a future Board Meeting will report on the actions when they are
approved.
At 6:57 p.m., the Committee reconvened in regular session.
(15) ADJOURNMENT
The Chair declared the meeting adjourned at 6:57 p.m.
ubmitied by:
Tappan
t ering Committee Secretary
rnwr.er.�.wmunrEmw cavwmeeocawwawm scw+ra.ro,.ma
Y
v
Orange County Sanitation District
MINUTES
BOARD MEETING
AUGUST 25, 1999
OJ�t ANITgl�O
'Lls O
c 9
O y
�WV'V
H
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
q'.
Minutes for Board Meeting
9 08/25/99
v Page 2
ROLL CALL
A regular meeting of the Board of Directors of the Orange County Sanitation District, was
held on August 25, 1999, at 7:00 p.m., in the District's Administrative Offices. Following the
Pledge of Allegiance and invocation the roll was called and the Secretary reported a quorum
present as follows:
ACTIVE DIRECTORS ALTERNATE DIRECTORS
X Jan Debay, Chair Tom Thomson
X Peer Swan, Vice Chair Darryl Miller
X Steve Anderson Steve Simonian
X Don Bankhead Jan Flory
A Shawn Boyd Paul Snow
X John Collins Laurann Cook
A Lynn Daucher Roy Moore
A Brian Donahue Harry Dotson
X Norman Z. Eckenrode Constance Underhill
A James M. Ferryman Arthur Perry
X Peter Green Dave Garofalo
A John M. Gullixson Gene Wisner
X Mark Leyes Bruce Broadwater
A Jack Mauller Patsy Marshall
X Shirley McCracken Tom Daly
X Pat McGuigan Thomas E. Lutz
X Mark A. Murphy Mike Spurgeon
X Joy Neugebauer James V. Evans
X Russell Patterson Richard A. Freschi
X Anna L. Piercy Tim Keenan
A Thomas R. Saltarelli Jim Potts
A Christina Shea Greg Smith
X Jim Silva Chuck Smith
X Charles E. Sylvia Ron Bates
Paul Walker X Kenneth Blake
STAFF MEMBERS PRESENT: Don McIntyre, General Manager, Penny Kyle, Board Secretary;
Bob Ghirelli; Ed Hodges; David Ludwin; Patrick Miles; Bob Ooten; Mike Peterman; Gary Streed;
Michelle Tuchman;Wendy Sevenandt; Layne Baroldi; Paula Zeller, Brian Singman; Jim Hams;
Jim Herberg; John Linder, Ryal Wheeler, Sam Mowbray; Mike Moore; Charlie McGee
OTHERS PRESENT: Tom Woodruff, General Counsel; Tom Nixon; Alternate Director Dave
Garofalo; Congressman Dana Rohrbacher, Paul Healy; Ray Silver, Don Hughes; Kris
Lindstrom; Don Schulz; Irwin Haydock;
p
Minutes for Board Meeting t
08/25/99 y
Page 3
REPORT OF THE CHAIR
The Chair advised Directors that the committees would resume meeting in September.
Chair Debay then reported on the CASA Conference that was held in August, and encouraged
Directors to attend these conferences. The next conference will be held in Palm Springs in
January.
REPORT OF THE GENERAL MANAGER
The General Manager recognized Bob Ghirelli, Director of Technical Services, who spoke to the
Directors on the Huntington Beach closure.
Mr. Ghirelli reviewed the various measures and processes the District had undergone to try to
identify where the bacteria was coming from, and all testing was negative. The District tested all
restroom sewer laterals, found one line break and fixed it. The bacteria levels were spreading
and as of August 25", the Healthcare Agency dosed more of Huntington Beach, from the
Huntington Beach pier to Golden West Avenue.
When the reports came back negative, staff decided to then further ocean samples along the
outfall and back towards the power plant in a triangular shape. All samples came back clear
and @ has been determined the outfall is not the source of contamination. Staff is continuing to
monitor the surf zone as well as offshore monitoring.
For the last two weeks a contractor and staff have been cleaning out the siphon in the Coast
Trunk Sewer so that the siphon can be monitored by closed circuit TV. Initial inspection
indicates that the siphon has no visual cracks or holes and no water is seeping in.
Mr. Ghirelli then outlined the next steps the District would be undertaking to resolve the
problem: infrared Flyover and visual inspection; possible dye study; additional sampling and
hydropunching along side of the outfall pipe; sample testing of Talbert Marsh; and further
inspection of the construction site on Pacific Coast Highway in Huntington Beach.
Directors entered into a discussion and asked questions of staff. Mr. Ghirelli stated that
effective July 26, 1999 new health standards came into effect due to AB 411.
Congressman Dana Rohrbacher was then recognized who offered his support and assistance in
obtaining state and federal assistance and coordination. General Manager Don McIntyre staled
that assistance would be needed in the future in diverting dry weather storm drain Flows to the
District's treatment plant
Staff requested that an emergency item be added to the agenda requesting authority for
$300,000 to modify the siphon on the Coast Trunk Sewer and insert a slip line inside the siphon.
MOVED, SECONDED AND DULY CARRIED: Finding that the following matter arose
subsequent to the posting of the agenda and there is a need to take immediate action thus
requiring it to be added to the agenda pursuant to authority of Government Code Section
54954.2(b)(2), to wit: award of a contract to modify the Coast Trunk Sewer, and,
Minutes for Board Meeting
08/25/99
v Page 4
MOVED, SECONDED AND DULY CARRIED: That the Board finds and resolves that there
presently exists a great public health hazard in the surf zone of the ocean in that high levels of
bacteria, indicative of human waste and other sewage, have been discovered and the District's
adjacent Coast Trunk Sewer needs modification to insure against any spill or discharge from the
sewer system; and that the public interest and necessity require immediate expenditure of
public monies to safeguard life, health and property; and that a contract be awarded for
construction of said modifications without notice and soliciting sealed bids, as authorized
pursuant to Public Contract Code Section 20783.
MOVED, SECONDED AND DULY CARRIED: That the General Manager be authorized to issue
an emergency purchase order for a construction contract to include staff time and contingency
in an amount not to exceed$300,000 for Coast Trunk Siphon Modification Sewer, Contract
No. 11-13-4.
REPORT OF GENERAL COUNSEL
General Counsel reported that with respect to the Montrose matter of litigation, on August 19,
1999, the United States District Court approved and entered as a Judgement, the Amended
Consent Decree.
APPROVAL OF MINUTES
There being no corrections or amendments to the minutes of the regular meeting held
July 21, 1999, the Chair ordered that said minutes be deemed approved, as mailed.
RATIFICATION OF PAYMENT OF CLAIMS
MOVED, SECONDED AND DULY CARRIED: Ratify payment of claims set forth on exhibits "A"
and "B", attached hereto and made a part of these minutes, and summarized below:
ALL DISTRICTS 07/15/99 07/31/99
Totals $4,779.505.54 $18.805,393.44
Director Leyes abstained.
NON-CONSENT CALENDAR
11. DRAFT STEERING AND AD HOC COMMITTEE MINUTES: A verbal report was
presented by Director Jan Debay, Chair of Steering Committee, re the August 25, 1999
meeting.
The Chair then ordered the draft combined Steering and Ad Hoc Committee Minutes for
the meeting held on July 21, 1999 to be filed.
12. DRAFT JOINT GROUNDWATER REPLENISHMENT SYSTEM COOPERATIVE
COMMITTEE MINUTES: A verbal report was presented by Director John Collins, Vice
Chair of the Joint Groundwater Replenishment System Cooperative Committee.
Minutes for Board Meeting
08/25/99
Page 5
The Chair then ordered the Joint Groundwater Replenishment System Cooperative
Committee Minutes for the meetings held on July 26 and August 12, 1999 to be filed.
13. MOVED, SECONDED AND DULY CARRIED: Receive and file Treasurer's Report for
the month of July 1999.
14. MOVED, SECONDED AND DULY CARRIED: (1)Approve Amendment No. 5 to
Agreement for Removal and Disposal/Reuse of District's Residual Solids with Pima Gm
Systems, Inc., extending the contract term from 04/01/00 to 06/30/00 with two additional
one-year extensions and increasing the costs per ton of biosolids managed from $21.92
to$25.90 for fair weather management, and $33.70 for inclement weather management
for an annual amount not to exceed$1,993,000; and,
(2) Approve Amendment No. 3 to Agreement for Removal and Disposal/Reuse of
District's Residual Solids with the Bio Gro division of Wheelabrator Water Technologies,
Inc., extending the contract term from 04/26/00 to 06/30/02 and increasing the costs per
ton of biosolids managed from$21.45 to$25.45 for fair weather management and from
$29.00 to $36.00 for inclement weather management, for an annual amount not to
exceed $1,775,000; and,
(3)Approve Amendment No. 1 to Agreement for Management of Biosolids with Tule
Ranch/Magan Farms, extending the contract term from 12/02/01 to 06/30/04 and
increasing the costs per ton of biosolids managed from $22.40 to $25.00, for fair weather
management and $28.00 for inclement weather management for an annual amount not
to exceed $1,371,000.
15. MOVED, SECONDED AND DULY CARRIED: (1)Approve the plans and specifications
for Rehabilitation of Digesters I, J. K, L, M. N, and 0 at Plant No. 2,Job No. P2-39, on
file at the office of the Board Secretary; (2) Receive and file Addenda Nos. 1, 2, 3, and 4;
(3) Receive and file bid tabulation and recommendation; and (4)Award a contract to
Margate Construction, Inc. for Rehabilitation of Digesters I, J, K, L, M, N, and 0 at Plant
No. 2, Job No. P2-39, for a total amount not to exceed $9,647,600.
16. Ordinance No. OCSD-10, Amending Table B and Table C of Ordinance
No. OCSD-06, Relating to Industrial Dischargers, Source Control, Non-Compliance
Sampling Fees, and Class I and Class II Perittee Charges for Use:
A brief report was given by General Counsel regarding the proposed ordinance.
OPEN HEARING: The Chair declared the hearing opened at 8:29 p.m. No
correspondence was received and no objections in other fors were received on this
Ordinance. No persons requested to speak to the Board on this issue.
CLOSE HEARING: The Chair declared the hearing closed at 8:30 p.m.
Minutes for Board Meeting
08/25/99
Page 6
MOVED, SECONDED AND UNANIMOUSLY ADOPTED: Read Ordinance No. OCSD-
10, Amending Table B and Table C of Ordinance No. OCSD-06, Relating to Industrial
Dischargers, Source Control, Non-Compliance Sampling Fees, and Class I and Class II
Pennittee Charges for Use, by title only, and waive reading of entire ordinance.
MOVED, SECONDED AND DULY CARRIED:Adopt Ordinance No. OCSD-10,
Amending Table B and Table C of Ordinance No. OCSD-06, Relating to Industrial
Dischargers, Source Control, Non-Compliance Sampling Fees, and Class I and Class II
Pennittee Charges for Use.
17. General Counsel reported a need for a dosed session, as authorized by Government
Code Section 54956.9, to consider those items listed on the agenda as Item Nos.
17(a)(1), (2), (3), (4). (5) and (6). General Counsel also indicated a need to add one
item that arose subsequent to the publication of the agenda. He reported that additional
items could be added pursuant to Government Code Section 54954.2(b)(2), upon a two-
thirds' vote of the Directors. No other items would be discussed or acted upon.
MOVED, SECONDED AND DULY CARRIED BY UNANIMOUS VOTE: That evaluation
of the General Manager's performance be added to the agenda as Item
No. 17(a)(7).
CONVENE IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTION 54956.9:
The Board convened in dosed session at 8:31 p.m., pursuant to Government Code Section
54956.9. Confidential Minutes of the ClosedSession held by the Board of Directors have been
prepared in accordance with Califomia Government Code Section 54957.2 and are maintained
by the Board Secretary in the Official Book of Confidential Minutes of Board and Committee
Closed Meetings. No reportable actions were taken re Agenda Item Nos. 17(a)(1), (2). (3), (4),
and (5). The Board did not consider Agenda Item No. 17(a)(6), and no report was given.
RECONVENE IN REGULAR SESSION: At 9:30 p.m.,the Board reconvened in regular session.
17(a) 7. MOVED, SECONDED AND DULY CARRIED: Adopt Resolution No. OCSD
99-15, Amending Resolution No. OCSD 98-33 Relating to Compensation of the
General Manager.
ADJOURNMENT: The Chair declared the meeting adjourned at 9:30 p.m.
r /9
Secretary of the'�oard of D' tors of
Orange Coun amtation District
H1wpAtMapendalBortd Minotea11999 Board Minutm=2599400
Claims Paid From 711y99 to 711SMS
Warrant No. Vendor Amount Deacription
Accounts Payable-Warrants
20564 Carollo Engineers E 151,919.24 Engineering Services-P11-36.2,P2.60,J-25.4 8 J-34-1
20565 Communications Performance Group, Inc. 37,200.00 Lab Supplies
20566 Dell Direct Sales L.P. 39.476.69 11 Notebook Computers, 1 HP Printer 814 RAM Kits
20567 E.I.Du Pont De Nemours and Company 35.508.00 Painting Maint.Services MO4-22-98
20568 Glerlich-Mitchell,Inc. 39,895.67 Belt, Filler Press Supplies
20569 James Martin 8 Co. 99,650.00 Professional Services-Data Integration Project MO W7/98
20570 Kemiron Pacific, Inc. 34,956.44 Ferric Chloride MO 9-27-95
20671 Lee 8 Ro, Inc. 42,791.90 Engineering Consulting Services-MO 12-8-94
20572 MacDonald-Stephens Engineers, Inc. 52,403.77 Engineering Services 2-37
20573 Pima Gro Systems, Inc. 31.177.98 Residuals Removal MO 3-29-95
20574 Polydyne,Inc. 37,135.40 Cationic Polymer MO 3-11-92
20575 Reliastar 25,059.61 Employee Medical Health Premium
20576 Rockwell Engineering 8 Equipment Co. 28,126.25 Pump Supplies
20577 Science Applications Intl.,Corp. 74.460.76 Ocean Monitoring MO 6-8-94
20578 United HeallhCare 127,735.41 Medical Health Insurance
20571 V 8 A Consulting Engineers 32.148.39 Engineering Services-Corrosion Assessment Study Phase II
20580 Vulcan Chemical Technologies 30,980.71 Hydrogen Peroxide Specification No:C-044
20581 Fleming Engineering,Inc. 731,384.93 Construction 7-17
rr 20582 KPRS Consimctlon Services,Inc. 148,145.40 Construction P2-65
q 20583 Southern Contracting Company 40,265.00 Construction P2-47-1
20584 American Telephone 8 Telegraph Corp. 2,326.14 Long Distance Telephone Services
20585 American Telephone 8 Telegraph Corp. 116.53 Long Distance Telephone Services
20586 Adamson Industries 1.753.31 Lab Supplies
20687 Advanced Sealing 8 Supply Co., Inc. 1,687.49 Mechanical Parts 8 Supplies
20588 Aldco Systems,Inc. 14,611.80 Electrical Supplies
20589 Air Cold Supply 634.82 Air Conditioner Repairs
20590 Air Products 8 Chemicals 22,894.98 O 8 M Agreement Oxy Gen Sys MO 8-8-89
20591 Airborne Express 118.25 Air Freight
20592 American Airlines 2.767.00 Travel Services
20593 American Society for Training 8 Dev. 61.90 Registration
20594 American Training Resources,Inc. 425.81 Training Matedals
20595 Anthony Pest Control, Inc. 315.00 Service Agreement-Pest Control
20596 Applied Industrial Technology 214.75 Electrical Parts 8 Supplies
20597 Armor Vac Sweeping Service 540.00 Vawum Truck Services
20598 Arl s Disposal Service,Inc. 968.46 Waste Removal
20599 Asbury Environmental Services 245.00 Waste Oil Removal
20600 Atlantis Pool Care 612.56 Service Agreement
20601 Audio Video Supply,Inc. 58.37 Video Supplies
20602 Aurora Data Systems 4,449.95 MSDS Scanning 8lndexing Services
Page 1 of 8
Claims Paid From 711199 to 7/15199
Warrant No. Vendor Amount Description
20603 Auto Shop Equipment Co.,Inc. 346.08 Filters
20604 Awards&Trophies By Bea 554.37 Plaques
20605 ACT Group, Inc. 400.00 Service Agreement-Office Equipment
20606 AMA 3,900.00 Registration
20607 American Industrial 628.04 Chemicals-Pest Control
20608 APEX Communications 951.28 Communication Equipment Upgrade
20609 American Telephone&Telegraph Corp. 437.71 Telephone Services
20610 American Telephone&Telegraph Corp. 430.55 Telephone Services
20611 AT&T Wireless Service 3,538.03 Cellular Telephone Service
20612 L.A.Cellular Telephone Company 1,897.14 Cellular Telephone Services
20613 AWSI 163.00 Department of Transportation Training Program
20614 Bailey,Fisher&Porter 672.20 Electrical Supplies
20615 Bar Tech Telecom,Inc. 1,457.04 Telephone Installation
20616 Bentley Systems, Inc. 5,252.81 Software Maint.
20617 BioVir Laboratories 1,313.29 Lab Supplies
20618 Boznanski&Co., Inc. 1,600.00 Appraisal Services-Porter Plating
20619 Bristol Systems,Inc. 19,902.50 Consulting Services-Y2K Project
20620 Bush&Associates, Inc. 2,163.00 Surveying Services MO 6-25-97
20621 Cal-Glass, Inc. 81.89 Lab Equipment Service
N 20622 Calif Centrifugal Pump 1,245.00 Pump Supplies
y 20623 California Auto Refrigeration Dist.,Inc. 393.56 Service Agreement
ry 20624 Caltrol,Inc. 1,299.25 Valves
20625 Cathcart Garcia von Langan Engineers 2,266.00 Engineering Services Pi-62
20626 Centrepointe Commercial Interiors 614.70 Office Furniture
20627 Charles P. Crowley Co. 365.58 Instrument Parts
20628 Coast Rubber Stamp,Mfg. 527.97 Office Supplies
20629 Sun International 405.95 Lab Supplies
20630 Connell GM Parts 34.52 Truck Supplies
20631 Consolidated Elect.Distributors,Inc. 3,370.42 Electrical Supplies
20632 Consolidated Plastics Company 193.78 Lab Supplies
20633 Contractors Equipment Co. 203.38 Equipment Repair
20634 Converse Consultants 10,778.60 Consulting Services P2-65
20635 Corporate Express 579.92 Office Supplies
20636 Cotelligem 8,610.00 Professional Services-Computer
20637 Counterpart Enterprises, Inc. 4,312.69 Mechanical Parts&Supplies
20638 County of Orange 518.94 Communication Service Agreement
20639 County Wholesale Electric Co. 2,209.10 Electrical Supplies
20640 CAPIO:Calif Assoc of Public Info OBds 60.00 Membership
20641 CH2MHill 2,399.40 Engineering Services-Microfiltrafion Project
20642 CH2MHill 8,503.77 Engineering Services-J-31
Page 2 of 8
m
Claims Paid From 711199 to 7115M
Warrant No. Vendor Amount Description
20643 CPI: California Pipeline Inspection 483.50 CCTV Inspection of 24"Sewer
20644 CPI-The ARemative Supplier,Inc. 1,361.53 Lab Supplies
20645 CR&R,Inc. 630.00 Container Rentals
20646 CWEA-TCP 30.00 Membership
20647 Dapper Tire Co. 1,779.71 Truck Time -
20648 David's Tres Service 1,950.00 Tree Removal
20649 Del Mar Analytical 1,004.00 Biosolids Analysis
20660 DeZurik C/O Misco/SouthWest 1,775.57 Valves
20651 Diamond H Recognition 2,642.08 Employee Service Awards
20652 Dickson's. Inc. 797.35 Electrical Supplies _
20653 Dunn-Edwards Corporation 871.15 Paint Supplies
20654 DGA Consultants,Inc. 16,605.87 Surveying Services MO 6-8-94
20655 Edinger Medical Group,Inc. 1,333.00 Medical Screening
20656 Electra-Bond 4,773.33 Mechanical Supplies-Belt Filter Press Rollers
20657 Employers Group 230.00 Registration Fees
20658 Enchanter, Inc. 3,500.00 Ocean Monitoring MO 5-24-95
20659 Environmental Sampling Supply 240.62 Lab Supplies
20680 Fairbanks Swiss, Inc. 3,934.36 Maim.Service Agreement
20661 FedEx Corporation 180.91 Air Freight
n 20662 Fibertron 1,422.00 Fiber Optic Cable
20663 Finnigan MAT Western Region 218.83 Freight
W 20664 Fisher Scientific Company, L.L.C. 2,070.70 Lab Supplies
20665 Forma Systems, Inc. 3.008.00 Professional Services-Geographical Infonnation System Project
20668 Fountain Valley Camera 82.53 Photo Supplies
20667 FLW Service Corp.South 167.33 Instrument Supplies
20068 FST Sand and Gravel,Inc. 309.13 Road Base Materials
20869 Ganahl Lumber Company 798.85 Lumber/Hardware
20670 GTE California 2,353.96 Telephone Services
20671 George Yardley Co. 1.929.67 Lab Supplies
20872 Glenarm Companies, Inc. 294.00 Publication
20673 Governmental Accounting Side Board 95.00 Subscription
20874 WAN Grainger,Inc. 195.65 Compressor Supplies
20675 Graseby STI 2.882.01 Engine Supplies
20676 Graybar Electric Company 650.81 Electrical Supplies
20677 Great American Printing Co. 579.26 Printing Service
20678 Great Western Sanitary Supplies 289.33 Janitorial Supplies
20679 Haaker Equipment Company 601.61 Truck Supplies
20680 Hamilton Company 49.83 Lab Supplies
20681 Harold Primrose Ica 96.00 Ica
20882 Harting&Associates 2,790.00 Professional Services-Process Control Software Standards
Page 3 of 8
Claims Paid From 711199 to 7115199
Warrant No. Vendor Amount Description
20683 Herb's Blacklorest Bakery& Deli 292.48 Catering Services
20684 Hilton, Famkopf&Hobson, L.L.C. 248.25 Consulting Services-Office Support Study
20685 Hoerbiger Service,Inc. 421.81 Compressor Parts
20686 Hoffman Southwest Corporation 20,352.88 Mainl.Services-Sewer Cleaning
20687 Holmes&Narver, Inc. 11.810.50 Engineering Services 2-40
20688 Home Depot 556.45 Small Hardware
20689 City of Huntington Beach 11,886.80 Water Use
20690 Idexx 5,238.09 Lab Supplies
20691 Imaging Plus,Inc. 1,567.64 Office Supplies
20692 Industrial Air Compressor 2,801.50 Equipment Rental
20693 Integra Biosciences, Inc. 69.44 Lab Supplies
20694 Integration Technologies 1,590.00 Training Registration
20695 Intergraph Corporation 862.00 Software
20696 Interstate Battery Systems 286.35 Batteries
20697 Irvine Photo Graphics 5.58 Photographic Services
20698 Irvine Ranch Water District 2.90 Water Use
20699 IBM Corporation 6,075.37 Service Contract
20700 ISI lnfonext 2.070.00 Service Agreement-Communication Equipment
20701 J.G.Tucker and Son. Inc. 2,681.95 Instrument Supplies
rt 20702 James Engineering, Inc. 3,397.00 Consulting Services-Benchmarking Project
y 20703 Jamison Engineering, Inc. 900.00 Misc.Construction Services
a 20704 Jay's Catering 510.09 Catering Services
20705 Johnstone Supply 381.37 Electrical Supplies
20706 Kalmar Promotions 1,458.60 Printing
20707 Industrial Distribution Group 2,365.40 Tools
20708 Labware, Inc. 4.600.00 Lab Information Management System Software MO 2-26-97
20709 Lexis-Nexis 501.86 Books&Publications
20710 Maintenance Technology Corp. 74.03 Welding Supplies
20711 Mar Vac Electronics 11.53 Instrument Supplies
20712 Masune Company 136.65 Safety Supplies
20713 Mc Junkin Corp—Ontario Branch 2.003.38 Plumbing Supplies
20714 McBain Instruments 560.00 Lab Supplies
20715 McGraw-Hill,Inc. 635.61 Publication
20716 McMaster-Can Supply Co. 216.66 Tools
20717 Mc Welco Rack-N-Box Company 1,298.76 Auto Parts&Supplies
20718 Mec Analytical System 650.00 Professional Services-Toxicity Testing
20719 Tri Pole Corp/MicroAge 18,363.78 Software Maint.Agreement
20720 Midway Mfg&Machining Co. 5,617.53 Mechanical Repairs
20721 Mission Uniform Service 2.132.29 Uniform Rentals
20722 Morgan Company 455.00 Truck Repair
Page 4 of 8 c
Claims Paid From 711199 to 7115199
Warrant No. Vendor Amount Description
20723 M.J.SchM&Associates, Inc. 1,928.00 Professional Services-Corrosion
20724 Nat West Markets 750.00 COP Letter of Credit Fees
20725 National Plant Services, Inc. 1,170.00 Vacuum Truck Services
20726 National Technology Transfer,Inc. 15.910.00 Registration-Mechanical Training
20727 Newark Electronics 263A3 Instrument Supplies
20728 City of Newport Beach 145.35 Water Use
20729 Nickey Petroleum Co.,Inc. 20,635.58 Lubricant/Diesel Fuel
20730 Northwestern Carbon 3,095.00 Filters
20731 Office Depot Business Services Div. 1.461.75 Office Supplies
20732 Oracle Corporation 15,150.00 Training Registration
20733 Oracle Corporation-Support/Sales 5,107.35 Software
20734 Oracle Store 99.99 Publication
20735 Orange Coast Pipe Supply 91.61 Plumbing Supplies
20736 Orange County Forum 30.00 Registration
20737 Orange County Wholesale Electric,Inc. 155.66 Electrical Supplies
20738 Oxygen Service Company 1,524.01 Specialty Gases
�J 20739 P.L.Hawn Company,Inc. 1,422.30 Electrical Supplies
$ 20740 Pacific Bell 123.38 Telephone Services
�* 20741 Pacific Bell Internet Services 324.00 Internet Service
n 20742 Pacific Mechanical Supply 5.145.62 Plumbing Supplies
q 20743 Pacific Parts and Controls, Inc. 17,724.68 Software
u+ 20744 Parts Unlimited 503.26 Truck Supplies
20745 Perkin-Elmer Corp. 5.523.23 Lab Supplies
20748 Petce Animal Supplies, Inc. 202.91 Lab Supplies
20747 Phipps&Bird 4,231.02 Electrical Supplies
20748 Pinkerton Systems Integration 22,898.19 Security Card Reader System
20749 Primary Source 204.90 Office Furniture
20750 Pump Engineering 2,197.04 Pump Supplies
20751 Pulzmeister 298.19 Pump Supplies
20752 Duantema Environmental Services 950.00 Analytical Service
20753 R. L.Abbott&Associates 4,000.00 Kem County Biosolids Consulting Services
20764 Ralnin Instrument Co.,Inc. 2,595.90 Lab Supplies
20755 Refrigeration Supplies Distributor 67.03 Electrical Supplies
20756 Risk Sciences 2.000.00 Professional Services-Basin Plan Amendment
20757 RS Hughes Co,Inc. 313.68 Paint Supplies
20758 Schanels Waste Water Products, Inc. 1.100.00 Chemical-Tank Cleaning
20769 Sea-Bird Electronics, Inc. 334.15 Lab Repairs
20760 Secend-Sun 194.09 Light Fixtures
20761 Shamrock Supply Co.,Inc. 1.049.04 Tools
20762 Shopping.Com 622.31 Communication Equipment
Page 5 of 8
Claims Paid From 711199 to 7115199
Warrant No. Vendor Amount Description
20763 Shureluck Sales&Engineering 1,121.40 Tools/Hardware
20764 Siemon,Larsen&Marsh 4,000.00 Professional Services-Santa Ana River Watershed Group
20765 Supelco,Inc. 1,537.12 Lab Supplies
20766 Smith Pipe&Supply,Inc. 1,163.65 Plumbing Supplies
20767 Solti Computer Products 238.16 Computer Supplies
20768 SoftChoice 5,162.00 Software
20769 South Coast Air Quality Management Dist. 7,996.90 Emission Fees
20770 Southern California Water 66.88 Water Use
20771 Spex Cedprep,Inc. 121.63 Lab Supplies
20772 Standard and Poore Corp. 1,000.00 COP Contract Service
20773 Summit Steel 53.37 Metal
20774 Sun-Belt Landscape&Maintenance 6,463.00 Landscape Maint.
20775 Super Power Products 193.95 Janitorial Supplies
20776 SCAP 10,200.00 Consulting Service-Joint Accidental Release Prevention Program
20777 Ten Hoeve Bros.,Inc. 967.38 Instrument Supplies
20778 The Texacon Company 149.76 Mechanical Supplies
20779 The Burlington Northern and Santa Fe Railway Co. 7,500.00 Pipeline License Fees
20780 The Mentwood Corporation 4,034.99 Professional Services-Biosolids Land Inspection
20781 The Ralph Hernandez Company 20,964.00 Construction-Concrete Installation
rr 20782 The Register 2.068.20 Notices&Ads
y 20783 Think Earth Environmental Education 7,000.00 Membership
a 20754 Thompson Industrial Supply, Inc. 1,246.91 Mechanical Supplies
20786 Time Warner Communications 40.47 Cable Services
20786 Tony's Look&Safe Service&Sales 70.23 Locks&Keys
20787 Tropical Plaza Nursery,Inc. 11.730.00 Contract Groundskeeping MO 5-11-94
20788 Truck&Auto Supply, Inc. 321.84 Truck Supplies
20789 Truesdell Laboratories, Inc. 440.00 Lab Services
20790 Teksystems 2,887.50 Temporary Employment Services
20791 The Unisource Corporation 6,633.70 Office Supplies
20792 United Parcel Service 11.00 Parcel Services
20793 Valley Cities Supply Company 919.93 Plumbing Supplies
20794 The Vantage Group, LL.C. 9,272.00 Consulting Services-Source Control Programming Project
20795 Veme's Plumbing 8.200.00 Plumbing Supplies
20796 Village Nurseries 34.81 Landscaping Supplies
20797 Vision Service Plan-(CA) 7,448.88 Vision Service Premium
20798 V WR Scientific Products Corporation 7.213.14 Lab Supplies
20799 The Wackenhut Corporation 6.083.04 Security Guards
20800 Ward/Davis Communication 1,680.00 Registration
20801 Waters Corporation 1,761.69 Service Agreement-Lab Equipment
20802 Weed Instruments, Inc. 675.00 Software
Page 6 of 8
Claims Paid From 7/1/99 to 7/15/99 a .
Warrant No. Vendor Amount Description
20803 Wells Supply Company 7,794.59 Plumbing Supplies
20804 Western States Chemical, Inc. 20,583.18 Caustic Soda MO 8-23-95
20805 Wiztec Inc. 312.48 Computer Supplies
20806 Water Environment Federation 179.00 Software
20807 Xerox Corporation 8,803.64 Copier Leases
20808 Zenon Environmental Systems 4,000.00 Equipment Rental-Microfiltration Test Unit
20B09 First Fire Systems, Inc. 23,026.81 Construction Contract J-57 MO 2-25-98
20810 Denise A.Bell 596.11 Meeting/Training Expense Reimb.
20811 Ingrid G.Hellebrand 248.70 Meeting/Training Expense Reimb.
20812 William J.Lloyd 976.85 Meeting/Training Expense Reimb.
20813 County of Orange 330.00 Sewer Service Fees Admin.
20814 Ernest Yeboah 8 Advanced Computer 8 Tech. 1,206.00 Employee Computer Loan Program
20815 Orange County Sanitation District 1,432.10 Petty Cash Reimb.
20816 Philip F.Cordova 250.00 Meeting/Training Expense
20817 Employee Activity Committee 4.900.00 Employee Activity Budgeted Expense
20818 Voided Check - -
20819 Ron DeWitt and Compuxpress 1,746.00 Employee Computer Loan Program
20820 Delta Dental 37.259.20 Dental Insurance Plan
�,. 20821 J.D. Edwards World Solutions Company 64,650.00 Computer Based Training Software
r' 20822 Orange County Sanitation District 461,353.38 Payroll EFT Reimbursement
20823 Southern California Edison 30,836.08 Power
20824 State Board Of Equalization 33,014.00 Sales Tax Return
20825 Court Order 540.15 Wage Garnishment
20826 Carlton V.Phillips,Jr. 2.992.24 Legal Services-Porter Plating
20B27 Carlton V. Phillips,Jr. 1,348.51 Legal Services-Porter Plating
20828 Court Order 581.00 Wage Garnishment
20829 Court Trustee 1.048.66 Wage Garnishment
20830 CASA 720.00 Conference Registration
20831 CSMFO 00.00 Registration
20832 Court Order 611.07 Wage Garnishment
20833 Ecological Society of America 900.00 Printing
20834 Friend of the Court 339.50 Wage Garnishment
20835 Glenn Lukos 8 Associates 1,511.15 Engineering Service 2-41
20836 Industrial Steam 692.18 Pump Supplies
20837 Intl Union of Oper Eng AFL-CIO Local 501 1,731.51 Dues Deduction
20838 McMaster-Cart Supply Co. 294.20 Tools
20839 MAP(Management Action Program) 2,600.00 Training Registration
20840 Orange Coast Pipe Supply 677.98 Plumbing Supplies
20e41 Orange County Business Council 10,000.00 Membership
20842 Orange County Family Support 498.50 Wage Garnishment
Page 7 of 8
Claims Paid From 711/99 to 7/15199
Warrant No. Vendor Amount Description
20843 Orange County Marshal 110.00 Wage Garnishment
2DB44 OCEA 823.51 Dues Deduction
20845 Court Order 40.00 Wage Garnishment
20846 Court Order 298.00 Wage Garnishment
20847 Peace Officers Council of CA $19.00 Dues Deduction
20848 DOS, L.L.C. 810.34 Registration
20849 Rosen Electrical 561.71 Electrical Supplies
20850 Shamrock Supply Co., Inc. 252.92 Tools
20851 Siemon,Larsen 8 Marsh 3.000.00 Professional Services-Santa Ana River Watershed Group
20852 Snap-On Incorporated 1,546.94 Tools
2D853 So.Cal.Gas Company 14,361.40 Natural Gas
2DB54 Sough Coast Air Quality Management Dist. 13,773.20 Emission Fees
2DB55 Southern California Edison 7,382.81 Power
20856 Peer A.Swan 2,627.66 Meefing/fraining Expense Reimb.
20857 United Way 307.53 Employee Contributions
20858 WeBec'99 2,600.00 Registration
{y 20859 Nicholas J.Amontes 178.75 Meeting/Training Expense Reimb.
20860 Donald F.McIntyre 528.74 Meeting/training Expense Reimb.
20861 Robert Oaten 981.15 Meeting/Training Expense Reimb.
20862 Orange County Sanitation District 16,260.50 Workers Comp. Reimb.
y Total Accounts Payable-Warrants $ 3.246.398.20
0a
Payroll Disbursements
14705.14881 Employee Paychecks $ 141,556.35 BOP 8 Termination
14882- 15013 Employee Paychecks 167,943.65 Biweekly Payroll 7114199
38627-39519 Direct Deposit Statements 640,641.43 Biweekly Payroll 7114199
Total Payroll Disbursements $ 950,141.33
Wire Transfer Payments
Chase Bank of Texas National Association $ 151.902.50 July Interest Payment on 1993 Certificate of Deposits
Chase Bank of Texas National Association 232,952.86 July Interest Payment on 1990-92 Series A Certificate of Deposits
Slate Street Bank&Trust Co.of Ca. 198.110.65 July Interest Payment on 1990-92 Series C Certificate of Deposits
Total Wire Transfer Payments $ 582,966.01
Total Claims Paid 711/99-7115199 $ 4,779,605.54
Page 8 of 8 e
Claims Paid From 7116199 to 7/31199
Warrant No. Vendor Amount Description
Accounts Payable-Warrants
20863 Ashbrook Corporation $ 89,349.53 Belt Press Rollers
20864 RPI/Bio Gro 107,872.46 Residuals Removal MO4-26-95
20865 City of Newport Beach 1,667,493.00 Construction Reimbursement Agreement 5-41
20866 Cooper Cameron Corporation 32,810.47 Engine Supplies
20867 County of Orange 35,400.83 Reimbursement Agreement-SARI Line
2D868 Dell Direct Sales L.P. 58.317.54 4 Computer Workstations&27 RAM Upgrades
20869 DGA Consultants, Inc. 57,961.64 Surveying Services MO 6-8-94
2DB70 DMG-Maximus 66.870.00 Consulting Services-Finance Dept.Audit
20871 J.D.Edwards World Solutions Company 56,519.48 Computer Based Training Software
20872 Kemiron Pacific, Inc. 65,569.62 Ferric Chloride MO 9-27-95
20873 National Plant Services, Inc. 45,489.41 Vacuum Truck Services
20874 NETG(National Education Training Group) 27,476.25 Computer Based Training Software
20875 Southern Calif Coastal Water Research 275,000.00 Annual Membership
20876 Thermo Quest 82,199.08 Lab Supplies
20877 Tule Ranch/Magan Farms 183,289.79 Residuals Removal MO 3-29-95
20878 Vulcan Chemical Technologies 43,290.65 Hydrogen Peroxide Specification No:C-044
20879 Water Environment Research Foundation 71,760.00 Subscription
20880 Western States Chemical, Inc. 38,145.68 Caustic Soda MO 8-23-95
20881 Woodruff,Spradlin&Smart 140,373.13 Legal Services MO 7-26-95
rt
'0 20882 Advance Constructors, Inc. 90,613.80 Construction 5-41-1
r 20883 Ark Construction Company 164,232.67 Construction P1-444
N
20884 Brown 8 Caldwell 32,164.53 Engineering Services J-35-1
20885 Mike Pdich&Sons 362,298.00 Construction 6-12
20886 Parsons Engineering Science,Inc. 171,680.75 Engineering Services J-42
20887 Sancen Engineering, Inc. 71.775.00 Construction 2-34R
20888 Orange County Sanitation District 72,686.31 Worker's Camp.Reimb.
20889 A-Plus Systems 893.76 Notices&Ads
20890 Abeam 478.88 Hardware
20891 Advanced Sealing&Supply Co., Inc. 1,013.66 Mechanical Parts&Supplies
20892 Aearo Company 475.00 Safety Supplies
20893 Air Liquide America Corp. 299.32 Specialty Gasses
20894 Air Products&Chemicals 355.63 Lab Supplies
20895 Airborne Express 54.25 Air Freight
20896 Allen Press, Inc. 101.00 Printing Service
20897 Anthony Pest Control,Inc. 180.00 Service Agreement-Pest Control
20898 Appleone Employment Service 7,014.73 Temporary Employment Services
20899 Applied Industrial Technology 126.07 Electrical Parts&Supplies
20900 Datavault 101.50 Offshe Back-Up Tape Storage
20901 Armor Vac Sweeping Service 494.00 Vacuum Truck Services
20902 Arts Disposal Service, Inc. 322.82 Waste Removal
Page 1 of 9
Claims Paid From 7116199 to 7/31199
Warrant No. Vendor Amount Description
20903 Awards&Trophies By Bea 235.43 Plaques
20904 ADS Environmental Services, Inc. 1.000.00 Professional Services-Flow Monitoring Project
20905 American Telephone&Telegraph Corp. 39.89 Telephone Services
20906 Bar Tech Telecom, Inc. 1.529.86 Telephone Installation
20907 Battery Specialties 663.05 Batteries
20908 Beckman Coulter,Inc. 1.171.00 Lab Services
20909 Bolt Tech 93.62 Mechanical Parts&Supplies
20910 Brinderson Corp. 602.00 Fuel Management Maint.Service
20911 Bristol Systems, Inc. 10,380.00 Consulting Services-Y2K Project
20912 Brown&Caldwell 2,428.82 Engineering Services J-35-1
20913 Builders Book, Inc. 7.23 Publication
20914 Bureau Of Business Practice 218.20 Publication
20915 California Tattoo Manufacturing Co., Inc 1,238.07 Printing Service
20916 Cappo, Inc. 190.00 Conference Registration
20917 Carl R.Nelson,P.E. 830.00 Engineering Consultant
20918 Carl Warren&Co. 1,311.89 Insurance Claims Administrator
20919 Carcllo Engineers 3,845.50 Engineering Services-Document Management Project
20920 Cathcart Garcia von Langan Engineers 9,084.00 Engineering Services Pl-62
20921 Chem Lab Supplies 504.27 Chemical
rt 20922 Coast Rubber Stamp, Mfg. 26.86 Office Supplies
20923 Communications Performance Group,Inc. 9,090.00 Professional Services-Hazardous Energy Control Program
N 20924 Computers America,Inc. 797.02 Computer Supplies
20925 Connell GM Parts 341.81 Truck Supplies
20926 Consolidated Elect. Distributors, Inc. 289.00 Electrical Supplies
20927 Continental-McLaughlin 481.28 Hardware
20928 Copelce Capital, Inc. 1,432.00 Copier Lease
20929 Corporate Express Imaging 181.02 Computer Supplies
20930 Corporate Express 1.491.73 Computer Supplies
20931 Cost Containment Solutions 1,163.28 Worker's Camp.Services
20932 Counterpart Enterprises,Inc. 1,012.77 Mechanical Parts&Supplies
20933 County Wholesale Electric Co. 1,399.32 Electrical Supplies
20934 Culligan of Orange County 30.00 Soft Water Service
20935 Cytec Industries 11,780.25 Anionic Polymer Spec. No.9798-18
20936 CEM Corporation 499.55 Lab Supplies
20937 CEPA Company 1,140.04 Lab Equipment Maint.Service
20938 CNA Consulting&Engineering 16.139.00 Professional Services-Bar Code Inventory System
20939 CR&R, Inc. 630.00 Container Rentals
20940 CA Utilities Emergency Assn., Inc. 538.12 Membership
20941 CWEA Membership 55.00 Membership
20942 Daily Pilot 62.50 Notices&Ads
20943 Del Mar Analytical 3,140.00 Biosolids Analysis
Page 2 of 9 0
Claims Paid From 7116199 to 7131/99
Warrant No. Vendor Amount Description
20944 DeZudk C/O Misco/SouthWest 22.817.82 Valves
20945 Don Maurer 3.150.00 Consulting Service-Ocean Monitoring Program
20946 Thyssen Dover Elevator Corporation 1,331.10 Elevator Maintenance
20947 Edinger Medical Group,Inc. 160.00 Medical Screening
20948 Enchanter, Inc. 7,000.00 Ocean Monitoring MO 5.24-95
20949 Enterprise Technology Services,L.L.C. 10.986.94 Consulting Services-HIS Imp].&Support
20950 Environmental Express 1,626.12 Lab Supplies
20951 Environmental Resources Associates 1,205.50 Lab Supplies
20952 EMED Graphic Communications 5,567.48 Indentification Tags
20953 FedEx Corporation 445.98 Air Freight
20954 Filter Supply Company 21.11 Filters
20965 Fisher Scientific Company,L.L.C. 2,870.68 Lab Supplies
20956 Flo-Systems, Inc. 1,191.04 Pump Supplies
20957 Fluid Dynamics 910.00 Primary Process Equipment Rental
20958 Fountain Valley Camera 50.26 Photo Supplies
20959 Fountain Valley Paints,Inc. 285.83 Paint Supplies
20960 Franklin Covey 48.49 Office Supplies
20961 Fry's Electronics 1,156.71 Computer Supplies
c 20962 Ganahl Lumber Company 112.79 Lumber/Hardware
n 20963 GTE California 7,558.10 Telephone Services
20964 George Yardley Co. 781.94 Lab Supplies
Ww 20965 Gierlich-Mitchell, Inc. 5.652.98 Belt. Filter Press Supplies
20966 Glass Tech Supplies Inc. 3.175.18 Lab Supplies
20967 Glenn Lukos&Associates 6,735.26 Engineering Service 2-41
20968 Goldenwest Window Service 1,798.00 Window Cleaning Service
20969 Graseby STI 1.883.94 Engine Supplies
20970 Great American Printing Co. 62.44 Printing Service
20971 Harbour Engineering Group 5,744.20 Pump Supplies
20972 Hatch&Kirk, Inc. 543.54 Truck Supplies
20973 Herb's Blackforest Bakery&Deli 59.00 Catering Services
20974 Hewlett-Packard 1,616.37 Lab Supplies
20975 Hilton San Diego Resort 624.62 Registration
20976 Hoemiger Service, Inc. 1,067.96 Compressor Parts
20977 Hoffman Southwest Corporation 24,274.10 Maim.Services-Sewer Cleaning
20978 The Holman Group 1,429.94 Employee Assistance Program Premium
20979 Home Depot 791.68 Small Hardware
20980 Hub Auto Supply 108.39 Truck Parts
20981 Industrial Air Compressor 2,801.50 Equipment Rental
20982 Industrial Threaded Products, Inc. 203.62 Mechanical Parts&Supplies
20983 Intelligence Press,Inc. 945.00 Subscription
20984 International Mascot Corporation 745.00 OC Fair Uniform
Page 3 of 9
Claims Paid From 7116199 to 7131199
Warrant No. Vendor Amount Description
20985 Interstate Battery Systems 219.70 Batteries
20986 Intuitive Technology Corporation 6,270.00 Software Maint.Agreement
20987 Irvine Photo Graphics 16.71 Photographic Services
20988 Irvine Ranch Water District 29.64 Water Use
20989 IBM Corporation 1,630.00 IBM AS/400 Y2K Testing
20990 IBM Corporation 1.520.00 Training Registration
20991 Airgas Direct Ind-IPCO Safety Div. 1,810.90 Be"Supplies
20992 J.G.Tucker and Son, Inc. 922.02 Instrument Supplies
20993 J.P.Morgan Securities, Inc. 22,039.45 COP Remarketing 1990-92 Series
20994 Jays Catering 1.073.72 Catering Services
20995 Judith Learner 590.10 Training Registration
20996 Joint Instrumentation Committee 90.00 Registration
20997 K.S.Dunbar&Associates 6,875.00 Engineering Services 241
20998 K.P. Undstrom,Ina 9,478.69 Environmental Consulting Services MO 12-9-90
20999 Katmar Promotions 1,941.66 Printing
21000 Industrial Distribution Group 938.18 Tools
21001 Kodax 150.00 Registration
21002 Komax Systems,Inc. 220.00 Electrical Supplies
21003 Krone, Inc. 818.77 Electrical Supplies
21004 Lab Safety Supply, Inc. 62.97 Safety Supplies
21005 Lab Support 8,804.66 Temporary Employment Services
a 21006 LaserAll Corporation 711.83 Printer Service Agreement
21007 Lord Fleming Architects, Inc. 1,850.00 Architectural Services
21008 Maintenance Technology Corp. 338.83 Welding Supplies
21009 Mar Vac Electronics 62.38 instrument Supplies
21010 Matt Chlor, Inc. 831.02 Valves
21011 Mc Junkin Corp—Ontario Branch 43.00 Plumbing Supplies
21012 McMaster-Cart Supply Co. 562.87 Tools
21013 Mec Analytical System 650.00 Professional Services-Toxicity Testing
21014. Mesa Muffler 278.30 Truck Supplies
21016 Tri Pole Corp/MicroAge 2.436.54 Software Maint.Agreement
21016 Mid-West Associates 6,915.92 Pump Supplies
21017 Midway Mfg&Machining Co. 17.147.78 Mechanical Repairs
21018 Mission Janitorial 154.95 Janitorial Supplies
21019 Mission Uniform Service 4,709.58 Uniform Rentals
21020 Moreland&Associates 7,87825 Auditing Services MO 3-8-95
21021 MotoPhoto 9.75 Photographic Services
21022 Municipal Treasurers'Association 222.00 Membership
21023 Nasco 237.83 Instrument Supplies
21024 National Micr000mp Services 2.045.00 Service Agreement-Plant Automation
21025 Institute for National Measurement 881.95 Lab Supplies
Page 4 of 9
Claims Paid From 7116199 to 7137/99
Warrant No. Vendor Amount Description
21026 Neal Supply Co. 48.49 Plumbing Supplies
21027 Nickey Petroleum Co.,Inc. 552.44 Lubricant/Diesel Fuel
21028 Ninyo&Moore 1,044.00 Professional Services-Materials Testing MO 6-24-98
21029 The Norco Companies 145.00 Mail Delivery Service
21030 NAS Associates, Inc. 1.591.50 Lab Services
21031 Network Solutions Group 4,880.00 Engineering Services-Voice/Data Cable Upgrade
21032 Office Depot Business Services Div. 1,190.92 Office Supplies
21033 Orange Coast Pipe Supply 148.17 Plumbing Supplies
21034 Orange County Forum 450.00 Registration
21035 Orange County Wholesale Electric, Inc. 182.52 Electrical Supplies
21036 Orr Safety 9.550.52 Safety Supplies
21037 Oxygen Service Company 2.758.19 Specialty Gases
21038 OCB Reprographics 2.153.87 Printing Service-Spec P-173
21039 County of Orange 83.50 Permit Fees
21040 P.L. Hawn Company,Inc. 158.28 Electrical Supplies
21041 Pacific Bell 1,106.14 Telephone Services
21042 Pacific Mechanical Supply 374.64 Plumbing Supplies
21043 Pacific Pans and Controls,Inc. 4.592.17 Software
21044 Pagenet 1,483.73 Rental Equipment
rr 21045 Parkhouse Tire Co. 1,532.83 Time
21046 Peerless Wiping Materials Co. 700.38 Janitorial Supplies
21047 Petco Animal Supplies, Inc. 202.91 Lab Supplies
21048 Pitney Bowes 407.83 Postage Machine Service Agreement
21049 Polydyne,Inc. 24,431.33 Cationic Polymer MO 3-11-92
21060 Positive Formulators,Inc. 272.68 Chemicals-Pest Control
21051 Presidium,Inc. 2,083.33 Worker's Comp.Claims Admin.
21052 Quickstad Technologies 15.20 Training Registration Remaining Balance
21053 Rainbow Disposal Co., Inc. 2,393.48 Trash Removal
21054 Reliastar 24,750.07 Employee Medical Health Premium
21055 Remedy Temp 5,421.82 Temporary Employment Services
21056 Rosemount Analytical Inc. 568.62 Instrument Supplies
21057 RM Controls 287.73 Instrument Supplies
21058 RPM Electric Motors 1,026.69 Electric Motor Repair
21059 RSA Sutter Soil Products 1,187.94 Soil Materials
21060 Safety-IOeen 409.99 Service Agreement
210SI Laidiaw Environmental Services 5,135.00 Hazardous Waste Service Agreement
21062 Santa Fe Industrial Products, Inc. 11.36 Mechanical Supplies
21063 Schaners Waste Water Products,Inc. 13,602.60 Chemical-Tank Cleaning
21064 Schwing America.Inc. 1,676.56 Pump Supplies
21065 Scott Specialty Gases, Inc. 1,409.20 Specialty Gases
21066 Second-Sun 458.89 Light Fixtures
Page 5 of 9
Claims Paid From 7/16199 to 7131199
Warrant No. Vendor Amount Description
21087 Secretary of State 6.50 Publication
21068 Shamrock Supply Co., Inc. 903.11 Tools
21089 Smith Pipe&Supply, Inc. 124.67 Plumbing Supplies
21070 So.Cal.Gas Company 571.11 Natural Gas
21071 South Coast Water 3.232.50 Water Softener Equipment
21072 Spex Ceriprep, Inc. 785.77 Lab Supplies
21073 Sprint 38.25 Long Distance Telephone Service
21074 St. Lucie/CRC/Lewis Publishers 73.55 Publication
21075 Standard Supply&Equipment Co., Inc. 47.52 Pump Supplies
21076 State Board of Equllization 811.98 Underground Storage Tank Fee
21077 Strata International, Inc. 926.98 Chemicals
21078 Summit Steel 1,980.06 Metal
21079 Sun-Belt Landscape 8 Maintenance 4,420.00 Landscape Maint.
21080 Sunset Industrial Parts 2,295.65 Mechanical Supplies
21081 Super Chem Corporation 1,212.19 Chemicals
21082 Taylor-Dunn Manufacturing 208.88 Electric Cart Parts
21083 Textile Engineering Associates - 20.347.51 Belt Press Supplies
21084 Thompson Industrial Supply,Inc. 15.272.36 Mechanical Supplies
21085 Top Hat Productions 482.56 Catering Services
rt 21088 Tri-State Seminar On-the-River 200.00 Seminar Registration
21087 Truck&Auto Supply, Inc. 272.56 Truck Supplies
21088 Truesdall Laboratories,Inc. 352.00 Lab Services
Ch
21089 Teksystems 13,605.00 Temporary Employment Services
21090 U.S. Filter Corporation 2,525.50 Filters
21091 United Parcel Service 2,019.86 Parcel Services
21092 Valley Cities Supply Company 5,251.71 Plumbing Supplies
21093 Valley Splicing Co. 1,000.00 Equipment Repair
21094 Veme's Plumbing 917.34 Plumbing Supplies
21095 VWR Scientific Products Corporation 8,308.73 Lab Supplies
21096 The Wackenhut Corporation 6,188.88 Security Guards
21097 Waters Corporation 9,149.16 Service Agreement-Lab Equipment
21098 Weftec'99 2,185.00 Registration
21 D99 Wirth Gas Equipment Co. 6.271.05 Instrument Supplies
2110o WEF-Registration Dept. 193.32 Publication
21101 WEF Publications 231.00 Publication
21102 WESTCAS 2,200.00 Membership
21103 Xerox Corporation 8,166.97 Copier Leases
21104 Zymark Corporation 2,160.00 Lab Supplies
21105 Zenon Environmental Systems 4,000.00 Equipment Rental-Microfiltration Test Unit
21106 CNA Trust 10,068.20 Construction 5-41-1
21107 Nicholas J.Arhontes 590.00 Meefingrrraining Expense Reimb.
Page 6 of 9
Claims Paid From 7116199 to 7131199 r
Warrant No. Vendor Amount Description
2110E Catherine M.Biete 280.20 Meefing/Training Expense Relmb.
21109 Arnold G.Chavez 150.00 MeetingrTraining Expense Reimb.
21110 Barbara A.Collins 439.76 MeetinglTraining Expense Reimb,
21111 Mark A. Esquer 255.65 Meeling[Training Expense Reimb.
21112 Thomas M.Flanagan 339.99 Meefing/Training Expense Reimb.
21113 L.Kevin Hadden 189.53 Meeting/Training Expense Reimb.
21114 Ingrid G.Hellebrand 838.15 Meefingrrreining Expense Reimb.
21115 Sharon Nelius 178.00 Mestingri mining Expense Reimb.
21116 Michael L.Fetterman 1,452.83 Training Expense Reimb.
21117 Carolyn L.Thompson 112.31 V2K Expense Reimb.
21118 Simon L.Watson 378.64 MeefingrTraining Expense Reimb.
21119 Janice Debay 550.00 Meefingrimining Expense Reimb.
21120 JAMS/ENDISPUTE 7.600.00 Legal Services-United Technologies
21121 Orange County Sanitation District 513.89 Petty Cash Reimb.
21122 Robert F.Driver Associates 1,001.742.00 All Risk Property&Excess Liability Insurance
21123 Orange County Sanitation Distinct 442.550.15 Payroll EFT Reimbursement
21124 Advanced Engine Tech Corp. 21,628.14 Consulting Services-Emissions Monitoring Systems
21125 American Geophysical Union 603.00 Notices&Ads
21126 American Management Association 596.00 Registration
21127 Bay Area Dischargers Association 126.00 Training Registration
21128 Court Order 455.15 Wage Garnishment
21129 Bureau of Nafional Affairs 1.155.14 Publication
J 21130 California Automatic Gate 85.00 Service Agreement
21131 California Journal 39.95 Subscription
21132 Court Order 581.00 Wage Garnishment
21133 Consolidated Freightways 337.50 Freight
21134 Court Trustee 1,200.64 Wage Garnishment
21135 Dell Direct Sales L.P. 2,102.20 HP Printer
21136 Court Order 611.07 Wage Garnishment
21137 Division of Chemical Health&Safety 700.00 Registration
21138 Elsevier Science 150.00 Publication
21139 Excal Visual Communications 604.75 Training Supplies
21140 Friend of the Court 339.50 Wage Garnishment
21141 Infotec Santa Ana 1,125.00 Registration
21142 Intl Union of Oper Eng AFL-CIO Local 501 1,702.89 Dues Deduction
21143 IBM Corporation 798.07 Maint.Agreement
21144 Airgas Direct Ind-IPCO Safety Div. 971.19 Safety Supplies
21145 ITA Inc.-Toshiba Accessories 15.00 Publication
21146 J.D.Edwards World Solutions Company 240.00 Consulting Services
21147 LaserAll Corporation 381.01 Printer Service Agreement
21148 Lorman Education Services 179.00 Registration
Page 7 of 9
Claims Paid From 7116199 to 7131199
Warrant No. Vendor Amount Description
21149 Maintenance Technology Corp. 589.87 Welding Supplies
21150 Mar Vac Electronics 43.44 Instrument Supplies
21151 McMaster-Can Supply Co. 787.94 Tools
21152 M.J.Schiff 8 Associates, Inc. 481.50 Professional Services-Corrosion
21153 New Horizons Computer Learning Center 2,125.00 Training Registration-Computer
21154 Numatic Engineering 23.13 Publication
21155 Office Depot Business Services Div. 591.98 Office Supplies
21156 Orange County Family Support 498.50 Wage Garnishment
21157 Orange County Marshal 110.00 Wage Garnishment
21158 Orange County Water District 1,500.00 Meeting Registration
21159 Orange County Wholesale Electric,Inc. 943.02 Electrical Supplies
21160 Oxygen Service Company 235.20 Specialty Gases
21161 OC-American Society for Training 8 Development 80.00 Membership
21162 OCB Reprographics 2.021.08 Printing Service-Spec P-173
21163 OCFA 623.51 Dues Deduction
21164 Court Order 40.00 Wage Garnishment
211115 Court Order 296.00 Wage Garnishment
21166 Peace Officers Council of CA 810.00 Dues Deduction
21167 Recommended Resources 48.97 Publication
N: 21168 Santa Fe Industrial Products, Inc. 2,005.72 Mechanical Supplies
21169 Scott Specialty Gases,Inc. 201.03 Specialty Gases
21170 Shamrock Supply Co.,Inc. 79.20 Tools
21171 Shureluck Sales 8 Engineering 337.22 Tools/Hardware
21172 SkillPath Seminars 297.00 Training Registration
21173 Snap-On Incorporated 3,139.65 Tools
21174 Spintex Company, Inc. 6.928.08 Janitorial Supplies
21175 State of California 134.05 Wage Garnishment
21176 Sun Healthcare Group 3,050.34 Reconciliation User Fee Refund
21177 SWRCB Accounting Office 10,000.00 Admin. Fee-Newport Beach Spill
21178 Thompson Industrial Supply, Inc. 1,796.09 Mechanical Supplies
21179 Tri-State Seminar On-the-River 200.00 Seminar Registration
21180 United States Postal Service 5,000.00 Postage
21181 United Way 307.63 Employee Contributions
21182 ULI-the Urban Land Institute 25.00 Registration
21183 Victor Technology 13.37 Office Supplies
21184 VWR Scientific Products Corporation 350.70 Lab Supplies
21185 Water Environment Federation 705.00 Publication
21186 Shabbir S. Bassi 340.23 Meeting/Training Expense Reimb.
21187 David M.Chafe 291.61 Meeting/lraining Expense Reimb.
21188 Kelly J.Christensen 366.75 Meeting/iraining Expense Reimb.
21189 Theodore M.Mauter - 411.40 Meeting/Training Expense Reimb.
Page 8 of c .,
Claims Paid From 7/16199 to 7131199 '
Warrant No. Vendor Amount Description
21190 Portia A. Mina 2.392.49 Employee Computer Loan Program
21191 City of Huntington Beach 1,070.00 Permit Fee-Job No.P2-60
21192 County of Orange 240.00 Sewer Service Fees Admin.
21193 County of Orange 7,247.96 Sewer Service Fees Admin.
Total Accounts Payable-Warrants $ 6,265,500.84
Payroll Disbursements
15014-15038 Directors'Paychecks $ 8,087.19 Payroll 7/16/99
15039-15041 Employee Paychecks 69,275A5 Termination&IDEA
15042-15179 Employee Paychecks 181,471.81 Biweekly Payroll 728/99
15180-15180 Employee Paycheck 49.524.53 Termination
39960-40396 Direct Deposit Statements 653,560.50 Biweekly Payroll 728199
Total Payroll Disbursements $ 961,919.48
Wire Transfer Payments
Societe Generale It 56.036.30 2199-7199 LOC Payment on 1993 Certificate of Participation
Chase Bank of Texas National Association 3,620,729.71 Semiannual Principal&Interest Payment on 1990-92 Series B COP
State Street Bank&Trust Co.of Ca. 7,901,207.11 Semiannual Principal&Interest Payment on 1992 Advance Refund
Total Wire Transfer Payments $ 11,577,973.12
Y
ro
Total Claims Paid 7116f99-7131199 $ 18.805.393.44
b
Page 9 of 9
t
Draft
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
Orange County Sanitation District
WEDNESDAY, SEPTEMBER 1, 1999 — 5 P.M.
A meeting of the Operations, Maintenance and Technical Services Committee of the Orange
County Sanitation District was held on September 1, 1999, in the District's Administrative Office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
Directors Present: Others Present:
Pat McGuigan, Chair Daniel Cozad
James Ferryman, Vice Chair Mary Lee
Don Bankhead
John Collins, Past Board Chair Staff Present:
Jan Debay, Board Chair
Joy Neugebauer Blake Anderson, Assistant General Manager
Anna Piercy Bob Ghirelli, Director of Technical Services
Peer Swan, Vice Board Chair Ed Hodges, Director of General Services Admin.
Charles E. Sylvia Patrick Miles, Director of Information Technology
Kenneth Blake, Alternate Michelle Tuchman, Director of Communications
Mark Esquer, Engineering Manager
Directors Absent: Dave Halverson, Engineer
Peter Green Mike Moore, ECM Manager
Layne Baroldi, Regulatory Specialist
Jean Tappan, Acting Committee Secretary
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no comments by any member of the public.
(4) RECEIVE FILE AND APPROVE MINUTES OF PREVIOUS MINUTES
The minutes of the July 7, 1999 Operations, Maintenance and Technical Services Committee
meeting were approved as drafted.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 2
September 1, 1999
(5) REPORT OF THE COMMITTEE CHAIR
The members were provided with information from EPA on Y2K activities in the wastewater
treatment industry. The District was asked to report on its Y2K activities and this information
was included as one of the three cited case studies.
Chair McGuigan also announced that a closed session will not be necessary at tonight's
meeting.
(6) REPORT OF THE GENERAL MANAGER
The General Manager was not in attendance.
(7) REPORT OF THE ASSISTANT GENERAL MANAGER
Blake Anderson updated the members on the Kem County Biosolids Ordinance and the
District's response per CEOA requirements. Staff will be meeting with LA City Sanitation and
LA County Sanitation District representatives to refine the responses.
(8) REPORT OF THE DIRECTOR OF GENERAL SERVICES ADMINISTRATION
Ed Hodges explained the results of the water conservation program's toilet exchange program
and the proposed program for this next year.
(9) REPORT OF THE DIRECTOR OF INFORMATION TECHNOLOGY
Patrick Miles explained how the District became involved in the EPA Y2K Case Study, and
pointed out that there are other websites that might be of interest listed in the handout. Director
Collins suggested that a press release be distributed on this. Mr. Miles then updated the
members on the status of the Y2K program.
Mr. Miles also provided an update on the data warehouse program. It appears that savings will
be in the range of$134,000 in staff time alone.
The District's permanent website will be on line this month.
(10) REPORT OF THE DIRECTOR OF OPERATIONS AND MAINTENANCE
Mark Esquer, reporting for Bob Ooten, reported that for the last four months 50% secondary
final effluent flow was not achieved, though we have not been out of compliance nor was our
permit conditions violated. Procedures have been made to bring the flow back to the 50% level.
With the data warehouse system, monthly reports to the committee will now be prepared at the
push of a button.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 3
September 1, 1999
(11) REPORT OF THE DIRECTOR OF TECHNICAL SERVICES
Bob Ghirelli discussed the confidential memo regarding Gammon Ranch and explained the
conclusion. The problem resulted from application methods rather than the product, and Pima
Gro has negotiated a settlement with the farmer.
Mr. Ghirelli also updated the members on ongoing activities related to the Huntington Beach
closure. He explained the current thinking of why this problem surfaced. It appears to be from
the Talbert Channel. However, while the source of the contamination may never be well
defined, the focus of the investigation has shifted to urban runoff. The impacts of AB411 (the
State beach monitoring and standards law)were also discussed. Staff will be developing a dry-
weather run-off treatment policy for consideration by the Committee at a future meeting. A final
report on the investigation with recommendations will be prepared.
(12) REPORT OF GENERAL COUNSEL
General Counsel was not in attendance.
(13) ACTION ITEMS (Items a-d)
a. OMTS99-28: Authorize the General Manager to enter into an agreement with the
Municipal Water District of Orange County(MWDOC) for a multi-
agency Water Use Efficiency Program for an amount not to exceed
$825,000 for each of the next five years.
Motion: Moved, seconded, amended and duly carried to approve
stairs recommendation in concept. Staff will provide more detailed
cost breakdown and analysis, specifically addressing administrative
costs of the program.
b. OMTS99-29: Adopt Resolution No. OCSD 99-_,Adopt Best Management
Practices for Water Conservation that are cost effective to the
District.
Motion: Moved, seconded and duly carried to approve staffs
recommendation.
c. OMTS99-30 1) Approve a budget amendment of$139,000 for Parametric
Emission Monitoring System for eight Central Generation System
engines, increasing the total project cost not to exceed $703,200;
and 2) Approve Amendment No. 3 to the Professional Services
Agreement with Advanced Engine Technology Corporation (AETC),
providing for additional engineering services to design, install and
certify a Parametric Emission Monitoring system for eight Central
Generation System engines, for an additional amount of$62,500,
increasing the total amount not to exceed $404,500.
Motion: Moved, seconded and duly carried to approve staffs
recommendation.
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 4
September 1, 1999
d. OMTS99-31 Approve an agreement with Cyclus Envirosystems, Inc., for an
Anoxic Gas Flotation Process Demonstration, including the design
and construction of a test facility and ongoing support for a one-year
test, for an amount not to exceed $350,000.
Staff was asked to provide periodic status reports on this project.
Motion: Moved, seconded and duly carried to approve staffs
recommendation.
(14) INFORMATIONAL ITEMS (Items ac)
a. OMTS99-32: Results of Central Generation Operating Philosophy Study
Mark Esquer reported on the results of the study and the
recommendations. The major change would be to operate 4
engines at Plant 2 rather than 3.
b. OMTS99-33: Proposed Changes in SAWPA Governance and Watershed
Management along the Santa Ana River Watershed
Dan Cozad, SAWPA spokesperson, discussed the role of SAWPA
in the watershed, as well as alternative governance structures being
considered by its Board. He also discussed the water bond that is
currently being considered in Sacramento. The members
questioned who would be administering the money, and forwarded
additional discussion on representation to the Steering Committee,
as well as discussion of specific issues.
c. OMTS99-34: Tule Ranch/Magan Ranch Purchase
Layne Baroldi discussed the current status of this proposed
purchase. Staff was directed to continue due diligence on the Kings
County section and not on the Kern County portion, and to continue
to negotiate with Mr. Magan.
(15) CLOSED SESSION
There was no dosed session
(16) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY
Blake Anderson was asked when the money from the Orange County bankruptcy would be
received. The latest indication is after October 6. The Directors will be advised when the exact
date is known.
e
Minutes of the Operations, Maintenance
and Technical Services Committee
Page 5
September 1, 1999
(17) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(18) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND STAFF REPORT
There were none.
(19) CONSIDERATION OF UPCOMING MEETING
The next Operations, Maintenance and Technical Services Committee meeting is scheduled for
October 6, 1999 at 5 p.m.
(20) ADJOURNMENT
The Chair declared the meeting adjourned at 8:19 p.m.
Submitted by:
a Tappan
Ag Operations, Maintenance and Technical Services
mmittee Secretary
H:\wp.dla�dmin0S)MTS\090199 mjmu s.d.
OMTS COMMITTEE Meeting Date ToxOrd.
9/91r99 9122M
AGENDA REPORT IWn Number Item Number
OMr599-28 12(c)
Orange County Sanitation District
FROM: Edwin E. Hodges, Director General Services Administration
SUBJECT: WATER CONSERVATION COOPERATIVE PROJECTS PROGRAM
GENERAL MANAGER'S RECOMMENDATION
Authorize the General Manager to enter into an agreement with the Municipal Water District of
Orange County (MWDOC)for a multi-agency Water Use Efficiency Program for an amount not
to exceed $825,000, for each of the next five years.
SUMMARY
In July, staff brought forward, to the OMTS committee, an update on the District's water
conservation program. During the presentation, staff advised that in October 1998, the General
Manager was authorized by the Board to enter into an agreement with the Municipal Water
District of Orange County (MWDOC) for a multi-agency Water Use Efficiency Program. Under
the terns of the agreement, the District was to provide a total of$183,000 in funding for three
countywide programs.
The Water Use Efficiency Steering Committee (WUESC) is comprised of the following agencies:
City of Anaheim
OCSD
Coastal MWD
Southern California Water Company
South East Regional Reclamation Authority
IRWD
OCWD
MWDOC
The WUESC has developed a new water conservation program that should encourage greater
participation in replacing inefficient toilets. It is estimated that 900,000 residential toilets could
be replaced in Orange County creating annual savings of approximately 25,000 acre feet per
year, approximately 25 mgd. The new program would provide the ULF toilets at no cost to the
consumer.
For this fiscal year, the WUESC is proposing an Ultra-Low-Flush (ULF)toilet program that would
allow area residents to replace old toilets at no cost. The program would be financed with
existing funds that are currently being provided by the Metropolitan Water District ($60 per toilet)
and additional funds from the Orange County Water District(OCWD) ($15 per toilet)and the
Orange County Sanitation District ($15 per toilet). The District is currently contributing $10 per
toilet. This money along with the $60 per toilet being contributed by MWD,would completely
pay for new ULF toilets for area residents.
The WUESC estimates that 55,000 toilets per year could be given away at an estimated cost of
$825,000 per year to the District. The program would run for five years. Because the toilets
would reduce water consumption, the flow to the treatment plants would be less; thus the
District would realize a decrease in costly capital monies to build infrastructure and treatment
KM ft�MApa,e.A�%1900e 4Aos R*o 12(c)me Page
facilities. Attachment A shows the economic benefits to OCSD. This program shows a simple
payback within the first quarter of fiscal year 2004/2005.
In August, this issue was brought forward to the MWDOC Board of Directors. The MWDOC
Board has agreed to contribute a maximum of$3.3 million toward this project, (this equates to
$60/toilet). Also in August, the OCWD board agreed to fund $825,000 per year($15/toilet), with
the stipulation that the District also provide$825,000 per year($15/toilet), see attached staff
report.
This issue was also brought forward to the August 17, 1999 Guidance Review Committee
meeting. As a result, the Guidance Review Committee has requested that staff present this
item to the OMTS with their recommendation that the District participate in this program in the
amount of$825,000.00 per year for each of the next 5 years.
Ed Hodges, Director of General Services Administration, will present a verbal report on this
item.
Background
Historically, the District has been committed to the objectives of water reuse and water
conservation. Water reuse (reclamation) efforts have been focused on a cooperative
association with the Orange County Water District (OCWD). Additionally,water agencies within
the District's service area have actively developed and operated water conservation programs in
response to the need to prudently manage California's limited water resources. The District first
dealt with these issues in its 1989 Master Plan (volume 3) and is dedicating another entire
volume of the soon to be released Strategic Plan.
In November 1996, the California Urban Water Agencies and the Environmental Water Caucus
established principles supporting the joint development and advancement of an urban water
conservation framework as part of the CALFED Water Use Efficiency Common Program, The
Water Use Efficiency Common Program proposed several strategies to promote more efficient
allocation and use of water from the Bay-Delta watershed. Urban water conservation is one of
these strategies. Efforts to improve urban water use efficiency in California have been
underway for some time.
The 1991 signing of the Memorandum of Understanding Regarding Urban Water Conservation
in California greatly advanced urban water management by providing water agencies a
consensus-based framework in which to implement water conservation Best Management
Practices (BMP). There are 14 identified and accepted BMP's available today. BMP 2 deals
with Residential Plumbing Retrofit; BMP 6 deals with High-Efficiency Washing Machine Rebate
Programs; BMP 9 deals with Conservation Programs for Commercial, Industrial, and Institution
Accounts; and BMP 14 deals with the Residential Ultra Low Flush Toilet(ULFT) Replacement
Programs.
The Water Use Efficiency Common Program that the District is involved in with MWDOC
addresses an approach that staff believes best addresses a total of 8 of the14 BMP's.
OCSD Economic Benefits
The reduction of wastewater flows can, (1) reduce operating costs for the collection, treatment,
and outfall systems; and (2) delay and or reduce future capital improvements. The primary
source of cost savings is from delaying the need for and/or reducing the size of capital
improvements. The secondary source of savings is from reduced energy consumption and
other operations and maintenance savings from chemicals and labor.
xwn.eu*.nennnrtsiawao.w R.2on.is.q� 28..Page2
Volume 7 of the District's Strategic Plan deals with the issue of Water Reuse and Water
Conservation. Attachment C to that document is a June 1997 survey of Programs and Potential
Benefits to the District. In that report Camp Dresser McKee (CDM) noted that, "Combining the
projected cost savings per gallon for capital construction and energy, the total expected benefit
to the District is$112,755 per mgd per year of reduced, sustainable flows. This converts to
approximately$0.113 per gallon/day per year of reduced flow."
PROJECT/CONTRACT COST SUMMARY
$400,000.00 was allocated for water conservation in this years CIP budget. Staff believes that
this program will cost$825,000 and is requesting that$425,000 be transferred from the $3.5
million Cooperative Projects Program to supplement this shortfall.
BUDGETIMPACT
❑ This item has been budgeted.
® This item has been budgeted, but there are insufficient funds. (Line item: Section 8,
Pages 204 and 207)
❑ This item has not been budgeted.
❑ Not applicable (information item)
Staff budgeted $400,000 under the Water Management portion in this year's fiscal CIP budget
(Section 8, page 207)and $3,475,400 under the Cooperative Projects Inflow/Infiltration Program
(Section 8, page 204). Staff anticipated that$2,257,656 would be required to complete this
year's Cooperative Projects Program, leaving $1,217,744 in funds available for other
cooperative projects programs.
With a transfer of$425,000 from the Cooperative Projects Program budget to the Water
Management program there present a minimal effect on the budget.
ADDITIONAL BACKGROUND INFORMATION
N/A
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. Simple Payback Analysis (Attachment A)
2. MWDOC Agenda Item Submittal, dated July 14, 1999 (Attachment B)
EEH: pjm
Kwvemb.wwr�rsieee.+w�wws�eyero.w�rsao-ze.e:Fege 3
Attachment A
Conceptual Residential Toilet Retrofit Program
10-year simple payback anaylsis
OCSD Service Area
A B C D E IF H 1 J
Fiscal Existing New Year-end Cumulative Year-end Cumulative Annual Cumulative Economic
Year Toilets Toilets Toilets Yr-end Reduction Cost Savings Cost Savings Contribution Contribution Analysis3
(B+C=D) gallons' (E x$0.113=F)3 (G-I =J)
1997/1998 0 14,875 14,875 461.571 $ 62.158 $ 52,158 $ 98,200 $ 98,200 $ (46.042)
1998/1999 14,875 12.253 27.128 841,782 95,121 147.279 150,000 248,200 $ (100,921)
1999/2000 27,128 55,000 82,128 2,548,432 287,973 435,252 825,000 1,073,200 $ (637.948)
2000/2001 82,128 55,000 137.128 4,255,082 480,824 916.076 825,000 1,898,200 $ (982,124)
2001/2002 137,128 55,000 192,128 5,961,732 673,676 1,589,752 825,000 2.723,200 $ (1,133.448)
20022003 192,128 55,D00 247,128 7,668,382 866,527 2.456.279 825,000 3.548,200 $ (1,091,921)
20032004 247,128 55,000 302,128 9,375,032 1.059,379 3.515,657 825,000 4.373,200 $ (857,543)
20042005 302,128 302.128 9,375,032 1,059,379 4,576.036 4,373.200 $ 201,836
20052006 302.128 302,128 9,375,032 1.059,379 5,634,415 4.373,200 '$ 1,261,215
20062007 302,128 302,128 9.375,032 1,059,379 6,693,793 4,373,200 $ 2,320,593
'This value is a combination of actual single-family(63%)and multi-family(37%)retrofits or 31.03 gallons per day per toilet savings based upon fixture count data provided by MWDOC
3 This value assumes avoided costs for capital and O8M of$0.113/gallon per Volume 7 of the District's Strategic Plan
3 Economic Analysis does not include a cost figure for lost opportunity cost
ATTACHMENT B
WATER ISSUES COMMITTEE MEETING
July 14, 1999 -- AGENDA ITEM NO. 9
FIVE YEAR ULTRA LOW FLUSH TOILET CONSERVATION PROGRAM
COMMITTEE RECOMMENDATION:
Contingent upon approval of participation by the Orange County Sanitation
District, authorize financial participation with the Metropolitan Water District and
Orange County Sanitation District in a five-year Ultra-Low-Flush Toilet
conservation program to allow area residents to replace old toilets at no cost, at
a cost to OCWD of $15 per toilet (not to exceed $825,000 per year to OCWD),
the cost of which will be offset by a decrease in the necessary MWD
replenishment water purchases in the future.
v AGENDA ITEM SUBMITTAL
Meeting date: July 14, 1999 Budgeted: N/A
Program/Line Item No.: N/A
To: Water Issues Cte/Bd of Directors Cost Estimate: N/A
From: William R. Mills Jr. General Counsel Approval: N/A
Engineers/Feasibility Report Approved: N/A
Staff Contact: John C. Kennedy CEQA Compliance: N/A
SUBJECT: PROPOSED CONSERVATION PROGRAM
SUMMARY
The Water Use Efficiency Steering Committee (WUESC) is proposing an Ultra-Low-Flush
(ULF) toilet program that would allow area residents to replace old toilets at no cost. The
program would be financed with existing funds that are currently being provided by the
Metropolitan Water District ($60 per toilet) and additional funds from the District ($15 per
toilet) and the Orange County Sanitation District ($15 per toilet).
The committee estimates that 55,000 toilets per year (savings of 1 ,700 afy) could be
replaced at an estimated cost of $825,000 per year to the District. The program would run
for five years. Because the toilets would reduce water consumption, groundwater
production would be less, thus the District would realize a decrease in necessary MWD
replenishment water purchases in the future. The annual net savings to the District are
estimated at approximately $88,000.
The recently completed Water Master Plan assumed that the OCWD service area would
conserve an additional 30,000 afy by the year 2020 through local and regional efforts.
This program would conserve approximately 8,500 afy (five years x 1 ,700 afy).
The Orange County Sanitation District has agreed to contribute a maximum of $825,000
per year. The program has also been reviewed by the Producers Technical Advisory
Committee. The program would have no impact on the Replenishment Assessment.
RECOMMENDATION
Consider adoption of proposed conservation program and agendize action for consideration
at the July 21 Board meeting.
DISCUSSION/ANALYSIS
Existing OCWD Conservation Program
The District's existing conservation program was established in 1996 and encourages the
producers to install ULF toilets and low flow shower heads. The program is structured in a
manner that allows the producer to pump above the Basin Production Percentage (BPP)
without incurring the Basin Equity Assessment (BEA). The amount of pumping above the
r
BPP is based upon the amount of water conserved.
The District realizes savings from the program in the form of reduced MWD replenishment
water purchases. However the District does not receive BEA revenues for production
above the BPP resulting in a net neutral financial impact. Details of the existing program
are provided as attachment A.
Existing ULF toilet program
The existing ULF program is administered by the Municipal Water District of Orange County
(MWDOC). Residents are required to pay $20 per toilet. The program receives a $60 per
toilet subsidy from MWD and a $10 per toilet subsidy from OCSD. This program is
beginning to experience less participation and will eventually exist at a low level. In
addition the WUESC believes that the local water districts should be more aggressive in
replacing inefficient toilets.
Proposed ULF program
The WUESC is comprised of the following members and supporting staff:
Ed Aghjayan, Chair City of Anaheim
Blake Anderson OCSD
Ron Van Blarcom Coastal MWD
Kirk Brewer Southern California Water Company
Dave Caretto South East Regional Reclamation Authority
Paul Jones IRWD
Don McIntyre OCSD
Bill Mills OCWD
Stan Sprague MWDOC
The committee has developed a new program that should encourage greater participation in
replacing inefficient toilets. It is estimated that 900,000 residential toilets could be
replaced in Orange County creating an annual savings of approximately 25,000 afy. The
new program would provide the ULF toilets at no cost to the consumer.
The committee is requesting the OCWD and the Orange County Sanitation District to both
contribute $15 per toilet for the new program. The Sanitation District currently contributes
$10 per toilet. This money along with the $60 per toilet being contributed by MWD, would
completely pay for new ULF toilets for area residents.
Financial Impact to OCWD
The District would financially benefit from the new program. Assuming that each toilet
only last a minimum of 10 years and at 6% interest, the annual cost to the District is
approximately $112,000 per year. Groundwater production would be decreased by
approximately 1,275 afy, which would reduce required MWD replenishment water
purchases saving the District approximately $200,000 per year. The resulting net saving
for OCWD is approximately $88,000 per year.
If approved the District would receive monthly bills from MWDOC based upon the amount
of toilets retrofitted. Using annual retrofit estimates, OCWD would pay MWDOC 25% of
the District's estimated program cost at the beginning of each water year. Each monthly
bill would then be reduced 25%. An end of year reconciliation would adjust the final
monthly invoice.
Because the District's annual water budget is determined using the five year average
annually overdraft calculation, the District would initially incur expenses from the program
before any savings (reduced water purchases) were realized. Staff would issue small
amounts of commercial paper if necessary to initially fund the program and would repay the
debt with the eventually program savings.
George Martin from the City of Anaheim and Joe Berg from the Municipal Water District of
Orange County will make a presentation to the Committee.
PRIOR RELEVANT BOARD ACTION(S)
OMTS COMMITTEE Meeting Date Tn]Lerd.
9/01/99 9/R/99
AGENDA REPORT Imm Numtw Rem Number
0
,T599-29 12(d)
Orange County Sanitation District
FROM: Edwin E. Hodges, Director General Services Administration
SUBJECT: ADOPTION OF BEST MANAGEMENT PRACTICES FOR WATER
CONSERVATION
GENERAL MANAGER'S RECOMMENDATION
Adopt Resolution No. OCSD 99-16, Supporting Best Management Practices for Water
Conservation.
Summary
The CALFED Bay-Delta program is the driving force for water conservation in California. This
program is a collaboration between federal and state agencies to develop a long-term solution
to water supply and environmental problems affecting the San Francisco Bay/Sacramento-San
Joaquin Delta estuary (the Bay-Delta). The Bay-Delta is critical to California's water supply as it
provides two-thirds of the state's drinking water. Because many of the environmental problems
affecting the Bay-Delta are associated with the rate at which the Bay-Defta's water is used for
drinking and irrigation water, the CALFED program strongly supports water conservation and
efficient water use as part of any long-term solution.
In 1991, the Memorandum of Understanding Regarding Urban Water Conservation in California
(MOU) was created and signed by more than 145 retail and wholesale water agencies
throughout the State. They include:
1. City of Anaheim
2. Capistrano Beach Water District
3. Coastal Municipal Water District
4. El Toro Water District
5. City of Fullerton
6. City of Garden Grove
7. Irvine Ranch Water District
8. Los Alisos Water District
9. Mesa Consolidated Water District
10. Moulton Niguel Water District
11. Municipal Water District of Orange County
12. County of Orange
13. Orange County Water District
14. San Juan Capistrano Water Services
15. Southern Califomia Water Company
16. South Coast Water District
17. Trabuco Canyon Water District
18. Water Advisory Committee of Orange County
As part of the MOU, these agencies have agreed to implement the Best Management Practices
(BMP's) as they pertain to water conservation. These BMP's include 14 water use efficiency
programs that reduce consumption and thereby increase supply reliability. The BMP's include:
rvWn1NYlV.p.W`+i�•BwN A,w q 11M& �F� \31QI. Paget
1. Residential Indoor and Outdoor Water Use Surveys
2. Residential Plumbing Fixture Retrofits
3. Distribution System Water Audits, Leak Detection and Repair
4. Metering with Commodity Rates
5. Landscape Irrigation Budgets
6. High Efficiency Clothes Washers
7. Public Information
8. School Education
9. Commercial, Industrial and Institutional Audits and Incentives
10. Wholesale Water Agency Assistance
11. Conservation Pricing
12. Water Conservation Coordinator
13. Water Waste Prohibitions
14. Ultra-Low-Flush Toilets
These BMP guidelines only require those measures that are cost effective for a local agency
to be implemented. Attached for your guidance and information is a chart that shows where the
District is relative to the implementation of the BMPs.
Today, these BMPs are recognized throughout the world as a solid framework to advance the
efficient use of our valuable water resources. CALFED has included a Water Use Efficiency
Element in their Bay-Delta Solution to ensure increased efficient use of water exported from the
Bay-Delta area. By proactively implementing BMPs in Orange County, we can directly influence
the final CALFED solutions that are developed.
On August 17, 1999, staff met with the Guidance Review Committee to discuss this issue.
Staff believes that if the District is requiring our member cities to adhere to the BMPs as a
requirement for them to participate in the Cooperative Projects Program, then the District should
also be held to a similar standard. Staff believes that the attached chart clearly indicates that
we are currently implementing all BMPs that we believe are cost effective.
Ed Hodges, Director of General Services Administration, will present a verbal report on this
item.
PROJECT/CONTRACT COST SUMMARY
Since the guidelines only require those measures that are cost effective for a local agency to be
implemented, adoption of the BMPs will have little to no fiscal impact on the District.
BUDGETIMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds. (Line item: page )
❑ This item has not been budgeted.
® Not applicable (information item)
ADDITIONAL BACKGROUND INFORMATION
N/A
ALTERNATIVES
N/A
n.ev,u.n�wy Aep Re, vh%1999 R.po,amww.o ulm ma Paget
V
CEQA FINDINGS
NIA
ATTACHMEWS
Resolution No. OCSD 99-16
EEH: fw
\YWovWOhlMy EbdpmEaWnaN Aga aRepd %IMe fd ApeMa Re1wb\LUdBNmn 12(0,dl Page
v
Orange county sanitation Clearer
California Urban Water Conservation Council Memorandum of Understanding Signatory
Requirements for BMPS:
-OCSD would participate in BMPS where it is cost-effective.
BMP OCSD Involvement' CICSD Meets BMP?
1 Water Survey Programs for Single None currently. Potential contribution to increase No.
Family Residential and Multi-Family number of surveys conducted annually. MWDOC
Residential Customers currently spends about$375,000 per year. A
Cost/benefit analysis would need to be done to
determine If OCSD should be involved.
2 Residential Plumbing Retrofits OCSD has contributed$40,000 to the Focus on Yes.
OC Water Future Study
3 System Water Audits, Leak Not applicable to OCSD. This BMP is geared N/A
Detection and Repair solely toward retail water purveyors
4 Metering With Commodity Rates for OCSO Source Control Program requires large Yes.
All New Connections and Retrofit of water users to pay user fees based on flow
Existing Connections volume. New rate structure is designed to charge
in proportion to flow and strength for commercial
and residential users.
5 Large Landscape Conservation None. Outdoor use for landscaping doesn't N/A
Programs and Incentives impact OCSD flows or costs.
e High Efficiency Washing Machine None currently. OCSD Could fund washing No.
Rebate Programs machine rebates similar to ultra low flush toilet
(ULFT)program. MWDOC will be proposing
OCSD fundino contribution.
7 Public Information Programs OCSD has worked with MWDOC to market Yes.
ULFTs and has participated in public outreach
efforts.
8 School Education Programs OCSD outreach such as OC Fair. Yes.
9 Conservagon Programs for OCSD Source Control Division has been working No.
Commercial, Industrial, and with MWDOC to develop a commercial/industrial
Institutional Accounts water conservation program. MWDOC will
propose expanding residential toilet retrofit
program to include commercial/industrial
applications.
10 Wholesale Agency Assistance OCSD has provided funding and coordination with Yes.
Programs MWDOC, such as toilet retrofit funding.
11 Conservation Pricing OCSD user and connection fees are charged in Yes.
Proportion to sewage flow.
12 Conservation Coordinator OCSO has assigned staff to work on Yes.
Conservation.
13 Water Waste Prohibition This applies to retail agencies in droughts. N/A
14 Residential ULFT Replacement OCSO participates in ULFT retrofit rebates. Yes.
Programs
8/24/19992:30 PM waterconsbmps
4
RESOUTION NO, OCSD 99-16
SUPPORTING BEST MANAGEMENT PRACTICES FOR WATER
CONSERVATION
A RESOLUTION OF THE BOARD OF DIRECTORS OF ORANGE
COUNTY SANITATION DISTRICT SUPPORTING THE BEST
MANAGEMENT PRACTICES FOR WATER CONSERVATION
WHEREAS, the Orange County Sanitation District ("Districr) has long
supported, and continues to support, the policy of water conservation; and,
WHEREAS, in 1997, the California Urban Water Conservation Council
adopted the Best Management Practices for Water Conservation ("BMP's").
These BMP's assure the safe and beneficial use of water conservation when
properly managed in accordance with the California Urban Water Conservation
Council's Memorandum of Understanding, and,
WHEREAS, the District supports and implements the BMP's found in the
California Urban Water Conservation's Memorandum of Understanding, in order
to promote a standard of excellence for applying water conservation practices;
and,
WHEREAS, as part of the District's Cooperative Projects Program, the
Guidance Review Committee has required that all Cities and Special Districts
within the District's service area shall adopt the BMP's for water conservation,
and,
WHEREAS, the District maintains a diverse program of water
conservation consistent with the District's mission to protect public health and the
environment through excellence in wastewater systems, and
WHEREAS, the District desires to promote the continuance of water
conservation in its service area in a manner that is safe, environmentally
beneficial, and is sensitive to the needs of the communities involved.
NOW, THEREFORE, the Board of Directors of Orange County Sanitation
District,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1: That the Board of Directors supports the policy of water
conservation.
1
Section 2: That the Board of Directors supports the Best Management
Practices for Water Conservation, as adopted by the California Urban Water
Conservation Council.
Section 3: That the Board of Directors supports the use of the Best
Management Practices, as they apply to water conservation at its Treatment
Plant Facilities and throughout the District's service area.
PASSED AND ADOPTED at a regular meeting held September 22, 1999.
Chair
ATTEST:
Board Secretary
H:�.p.dlsadMn\ss\R s iW .s iesswcsDs 16.da
2
OMTS COMMITTEE NeWng Date To ad.Br dr.
911/99 9/27/99
AGENDA REPORT 1emNumt 1BmNumba
OMT599-30 13(e)
Orange County Sanitation District
FROM: Bob Dolan, Director of Operations and Maintenance
Originator: Ed Torres, Manager, Air Quality & Special Projects
SUBJECT: INSTALLATION OF PARAMETRIC EMISSIONS MONITORING SYSTEM
ON THE CENTRAL GENERATION SYSTEM ENGINES
GENERAL MANAGER'S RECOMMENDATION
1) Approve a budget amendment of$139,000 for Parametric Emission Monitoring
System for eight Central Generation System engines, increasing the total project cost
not to exceed $703,200; and 2) Approve Amendment No. 3 to the Professional Services
Agreement with Advanced Engine Technology Corporation (AETC), providing for
additional engineering services to design, install and certify a Parametric Emission
Monitoring System for eight Central Generation System engines, for an additional
amount of$62,500, increasing the total amount not to exceed $404,500.
SUMMARY
The District currently operates and maintains Continuous Emission Monitoring Systems
that measure Oxides of Nitrogen emissions from each of the eight Central Generation
System (CGS) engines. Due to aging equipment, lack of vendor support,
and Y2K reliability issues, the monitoring system is placing the District in risk of non-
compliance with our SCAQMD permit conditions and the cost of maintaining the
monitoring system has been steadily increasing.
In response to these concerns, Staff conducted a study in fiscal year 1997/98 to
evaluate replacement options. The results of the study recommended replacement with
a Parametric Emission Monitoring System. The new monitoring system utilizes engine-
operating parameters to determine NOx emissions from the engines. Installation of the
new monitoring system will provide the District with several advantages over the present
system. The advantages include annual 0&M savings; reliable and accurate
compliance determination; a diagnostic tool for evaluating engine health and
performance; and future flexibility to monitor other pollutants as required.
The study also recommended the use of a new technology that utilizes the output from
Fiber Optic Pressure Sensors. The sensors are installed in each engine cylinder to
determine emissions. This technology offers considerable cost savings in maintenance
of the engines (>$150,000 per year in savings compared to the present system) and
provides the necessary emissions determination accuracy that can meet SCAQMD's
new stringent standard.
In September 1998 the Board authorized $522,500 for the design, installation and
startup of the new monitoring system on all eight CGS engines. In June 1999, Staff
\VW,WO1My.CbYp�klewE Ag��%lM BUN Apm HepN�12(m)
Rw . MW Page 1
received Budget approval in the 1999/00 CIP to install the new monitoring system on all
eight CGS engines at a cost of$564.200. This included $342,000 to Advanced Engine
Technology Corporation (AETC) for engineering and installation services, $95,000 to a
source testing firm for emissions measurement, $43,000 for internal labor and materials,
$8,700 for permits, $47,500 in contingency funds for contract services and $28,000 for
previous years planning and studies. The technology being installed was new and the
regulatory certification requirements for the new monitoring systems at that time were
undefined.
In order to better define the costs, Staff proposed designing, installing and certifying on
one engine first and then proceeding with the remaining seven engines. This phased
approach would enable us to ensure that the technology works and accurately define
certification and installation costs for the remaining engines. Staff has completed
installation and certification testing on the one engine. The technology is working
accurately and reliably.
Staff has also prepared cost estimates for installing the new monitoring system on the
remaining seven engines. In order to complete the work on the remaining engines the
engineering consultant's (AETC) contract will need to be increased to cover the
remaining work due to a better definition of the actual scope based on the one engine's
installation. However, no additional contractual services funds are required since funds
previously authorized in September 1998 for emissions source testing and contingency
are available. The past budgets for in-house labor for regulatory coordination,
consultant support during installation, startup and certification, and portions of the
monitoring system materials installation will exceed original estimates. The project has
taken considerably more in house staff support than originally estimated.
PROJECT/CONTRACT COST SUMMARY
This project was budgeted in the 1999/00 Construction Projects CIP budget at total
project cost of$564,200. Based on the costs experienced with the installation of the
new monitoring equipment on the first engine the budget scope can be better defined.
The estimated total project cost for installation of the monitoring system on all eight
engines is now$703,200, an increase of$139,000. This includes $404,500 for
consultant services to conduct studies, design, installation and certification of the
monitoring system, $80,000 for emissions source testing, $15,350 for permits, and
$203,350 for internal labor, materials and previous years planning and studies. A
breakdown of the project costs is listed in Table 1.
\Y JanWael Mq Gelapenm'GMiSIBddApeMa gepwl5epenl'eMMiSW-MI Oa
q- d\oee Page 2
Table 1 - Cost Summary
v'
Cost Estimate Difference Revised Costs
AETC Consultant $342 000 $62 500 $404 500
SourceTest/Permits $95,000 ($15000) $80.000
Contingency $47,500 ($47,500) $0
Contractual $484,500 $0 $484,500
Services Subtotal
Internal Labor& $43,000 $132.350 $175,350
Materials
Permits $8700 $6,650 $15350
97/98 Studies $28 000 $0 $26 000
Project Budget
98/99 $564,200 $139,000 $703,200
Based upon a $703,200 total project costs and $150,000 annual saving compared to
labor and parts for the old monitoring system, payback period for the project is under
4.5 years.
BUDGETIMPACT
❑ This item has been budgeted. (Line hem: )
X This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
Staff request authorization for a supplemental appropriation to the authorized 1999/00
CIP budget to cover increased material costs, and increased staff support costs from
$564,200 to $703,200. Staff support from Maintenance, the Special Projects Division
and Information Technology have been substantially more than originally estimated.
More maintenance and materials to install the fiber optic infrastructure for the monitoring
system and significantly more staff time associated with permitting and certification of
the monitoring system were not anticipated. Additionally, staff request an authorization
increase of$62,500 in the consultants (AETC) cost to increase fees from $342,000 to
$404,500 to support completion of the installation of the new emission monitoring
equipment.
ALTERNATIVES
None, due to the need to have a fully functional, permittable, low maintenance emission
monitoring system.
CEQA FINDINGS
NA
ATTACHMENTS
None
\VMa,W,Yttry EmY,p4a10YtA1 WBApeMv Re ��--�
Re.YM, Wow Page 3
OMTS COMMITTEE Memng Ceee To ad.of or.
09/01/99 09/22ry9
AGENDA REPORT Rem Number Hem Number
OWS99+31 12(n
Orange County Sanitation District
FROM: Bob Ooten, Director of Operations and Maintenance
Originator: Ed Torres, Manager, Air Quality & Special Projects
SUBJECT: ANOXIC GAS FLOTATION (AGF) PROCESS DEMONSTRATION
GENERAL MANAGER'S RECOMMENDATION
Approve an agreement with Cyclus Envirosystems, Inc., for an Anoxic Gas
Flotation Process Demonstration, including design and construction of a test
facility and ongoing support for a one-year test, for an amount not to exceed
$318,000 and an additional contingency of$32,000.
SUMMARY
The purpose of anaerobic digestion at the District is to stabilize (treat) organic
solids produced in the primary and secondary treatment processes to prepare
the solids for land disposal. Stabilization is a process whereby the solids are
heated, mixed, and retained in a digester while bacteria break dawn the solids,
which kills pathogens and produces digester gas.
The purpose of the Anoxic Gas Flotation (AGF) system, which is a proprietary
process from Cyclus Envirosystems, Inc. (Cyclus) is to modify conventional
anaerobic digestion to improve the solids destruction, increase digester capacity,
and increase digester gas production. The AGF process uses a unique flotation
device to separate and concentrate the solid material in a digester. The solids
are put back into the digester for further stabilization. Subsequently, digested
solids also can be heated to a higher temperature (pasteurized) and further
digested at conventional temperatures in a second vessel. This overall process is
called "2-stage AGF," and it increases the overall solids destruction and digester
gas yield and produces Class A biosolids.
By increasing the amount of time the solids stay in the digesters, the conversion
of solids to methane gas is enhanced without sacrificing the overall throughput of
sludge to the digesters. The net effects are to increase the solids destruction and
biogas production and to decrease the amount of residual solids that must be
dewatered and disposed of. Since AGF digesters operate with higher solids
concentrations than conventional digesters, expansion costs for new digesters
and associated solids handling facilities to meet future higher influent flows can
be reduced or avoided.
X hry tlh*�Agw ReV�1WR WApy MpabVAYVd1Am 12H.Ee[
R«;,,.. WIM Page 1
Based on existing AGF performance data (as noted in the Background section
below) and appropriate District operating data, a performance and cost analysis
shows that with single stage AGF, the District's current annual solids operating
costs would be reduced by $1.0 million, or about 15%. If 2-stage AGF were used,
the annual savings would be $2.1 million. Over 20 years, the present value of
these operating cost savings could equal $12 million and $26 million,
respectively. At the projected year 2020 solids production, these annual savings
would approximately double.
A preliminary analysis also indicates that no new digesters, belt presses, or
biosolids processing or storage facilities would be needed to meet the projected
year 2020 flows if AGF proved usable. Taken together, the present value of the
construction and operating cost savings would approach $200 million over the 20
years. The projected cost to install AGF technology is $9-18 million depending
upon whether single stage or 2-stage AGF is used.
Staff recommends demonstrating the 2-stage AGF process on District solids
before committing to a full-scale implementation program. A process
demonstration program is proposed that would use a pilot plant constructed for
that purpose. The pilot plant would be designed with the flexibility to continue as
a general purpose digestion test facility after the AGF tests were completed. After
a one-year test of the AGF process, the proprietary equipment would be returned
to the vendor, leaving a fully functional two-stage digester pilot plant for the
District's continuing use. The cost for the pilot plant and the vendor's involvement
in the AGF test would be less than $318,000. The total project cost, including
District maintenance, laboratory, and project management charges, is estimated
at $387,000 over three fiscal years (1999-2000 through 2001-2002).
PROJECT/CONTRACT COST SUMMARY
A not-to-exceed contract for $318,000 is being requested. The final cost will be
less than this amount because Cyclus will repurchase the AGF separator at the
end of the test period for a mutually agreeable price.
The cost elements for the project are shown below.
Cyclus (engineering, equipment, 1-year project support) $ 318,000
Additional installation costs (piping and electrical) $ 21,000
Laboratory $ 7,000
Div. 880 project management and analysis $ 35.000
Contingency(10% of internal costs) $ 6.000
Total $ 387,000
N\W 0M11W^LHaN�YniG PeWb\IKB 6vitl IgnL R�pyb'ttWW,„\'mI.C%
R- &1^ Page 2
BUDGETIMPACT
® This item has been budgeted. (FY 99-00 tine item: CLP. Smtion s,P9 14)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable(information item)
ADDITIONAL INFORMATION
Backaround
The AGF process has been used for several years in industry(for example,
treating potato processing waste in Idaho). An earlier version of the process was
tested in a small pilot plant for one year by King County DNR (Seattle Metro),
and the Southwest Suburban Sewer District (SSSD) currently is operating a
small full-scale (0.5 MGD) plant. After two months' operation at steady stale, the
SSSD plant is showing that the AGF separator is working as expected, the
biogas production has increased as predicted, and less polymer and electricity
are being used than was predicted. In addition, the solids loading capacity of the
belt presses has been more than doubled, and the dewatered cake solids
content has increased from 18.6% to 24.5%.
Significant Impacts
If it performs as expected, adding the AGF process to the District's digesters
would significantly reduce or eliminate the need to build any more digesters, belt
presses, or biosolids storage facilities to meet the year 2020 flow predictions.
This would eliminate capital costs of$161 million. Digester modifications to meet
the year 2020 solids flows are estimated to cost $8 million for single stage AGF
or $17 million for 2-stage AGF. In addition, the AGF process would reduce
annual operating costs by as much as $3.6 million (at the year 2020 flows). The
present value of the savings over 20 years would approach $200 million. Table 1
presents the breakdown of expected annual savings (in 1999 dollars)for both
AGF options.
Table 1. ANNUAL OPERATING SAVINGS
Single Stage AGF 2-Stage AGF
Category 1 "432,000 $
20 1999 2020
Biosolids disposal $ 1415,000 $ 3,161.000 $ 4,426 000
Gas production $ 48.000 E 700 000 $ 882,000
Chemical use $ 55000 $ 000 E 72,000
Energyuse $ 1135 000 $ 1,718 000 E 1 422,000Total Savin s $ 1773 000 E 2120 000 E 3 814,000
N:Iwy.®�,9orE 12M 6s
x. am Page 3
f
Proiect Scope
A test of the AGF process in a specially-designed pilot plant at Plant 1 is
recommended. The vendor has completed the conceptual design of a suitable
pilot plant that would include a primary digester, an AGF solids separator, a
second-stage AGF system, and a gas handling system. Using two 2000-gallon
vessels, the facility would process up to 400 gal/day of primary, secondary, or
mixed sludge.
A contract with the vendor not to exceed $318,000 is recommended for the pilot
plant design, construction, and start-up, and on-going engineering support
services for a one-year test program. Eliminating the second stage could reduce
the equipment cost by about $60,000. This option is not recommended for
several reasons. The re-digestion step substantially increases the overall AGF
process performance and a cost analysis shows that it would nearly double the
operating cost savings achieved by the District with full-scale AGF. Also, the
second stage is needed to research production of a Class A biosolids product,
which is becoming increasingly important to the District. The evaluation of this
technology to produce a Class A biosolids is being coordinated with the District's
overall evaluation of alternative management strategies for our sludge and/or
biosolids. Finally, eliminating the second digester vessel would limit the facility to
single-stage digestion tests after the AGF tests were completed. This would
remove much of the pilot plant's flexibility, eliminating the capability to test two-
stage (or parallel single-stage) digester configurations.
ALTERNATIVES
1. Conduct a demonstration of the AGF process at District facilities. This will
verify the process performance and benefits that have been projected by the
vendor. If the AGF claims are confirmed and the process subsequently is
implemented, the District has the potential to avoid major capital construction
projects and significantly reduce the annual solids management costs.
2. Do not test the AGF process. This will save the cost of the project, but there is
no other way to obtain comparable data to determine the performance of the
AGF facilities at the District.
3. Test other processes to improve digester efficiency or decrease the residual
solids dewatering costs. Other digester variations (e.g., high temperature
thermophilic digestion) and dewatering options (e.g., centrifuges; fired biosolids
dryers) exist and are the subjects of continuing investigation by the District.
However, none of them offer the combination of digester efficiency improvement
and dewatering improvement that will both reduce the District's operating costs
and reduce the capital construction needed to meet the projected flow increases
HM ,ftUyW�Map RRpnh%IM8 M•peMv RgpbtlBBWbm 12M.
Rabet souse Page 4
over the next 20 years. In this respect, the AGF process is unique, and because
it is a proprietary process, no competitive vendor to Cyclus exists.
CECA FINDINGS
CEQA requirements are not applicable to this project.
ATTACHMENTS
None.
RJO/EMT/jpb
H ley.O1� MApdLL+Rq 11�B W AWi Rgvn�12M aoc
R. W. Page 5
e,
DRAFT
MINUTES OF PLANNING. DESIGN. AND CONSTRUCTION
COMMITTEE MEETING
Orange County Sanitation District
Thursday, September 2, 1999, at 5 p.m.
A meeting of the Planning, Design, and Construction Committee of the Orange County Sanitation
District was held on Thursday, September 2, 1999, at 5 p.m., in the District's Administrative
Office.
(1) ROLL CALL
The roll was called and a quorum was not present, as follows:
PDC COMMITTEE MEMBERS: STAFF PRESENT:
Directors Present:
Blake Anderson, Assistant General Manager
Norm Eckenrode, Chair David Ludwin, Director of Engineering
Steve Anderson Gary Streed, Director of Finance
John Collins, Past Chair Michelle Tuchman, Director of Communications
Jack Mauller John Linder, Construction Manager
Peer Swan, Board Vice Chair Doug Stewart, Engineering Manager
Matt Smith, Engineering Supervisor
Directors Absent: Jim Herberg, Engineering Supervisor
Lynn Daucher Jeff Shubik, Project Manager
Brian Donahue, Vice Chair Jean Tappan, Committee Secretary
Russell Patterson
Christina Shea OTHERS PRESENT:
Jan Debay, Board Chair
Mary Lee
Daniel Cozad
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
(4) RECEIVE. FILE AND APPROVE MINUTES OF PREVIOUS MEETING
The minutes of the July 1, 1999 PDC Committee meeting will be considered at the September 22,
1999 regular Board meeting.
v
PDC Committee Minutes f
Page 2
September 2, 1999
(5) REPORT OF THE COMMITTEE CHAIR
Committee Chair Norm Eckenrode stated that because of the lack of a quorum the agenda items
would be discussed and then forwarded to the Directors at the September 22, 1999 regular Board
meeting for consideration. Director Eckenrode also stated that he would like to see more cooperation
between agencies as experienced during the recent beach closure and he suggested a
recommendation be forwarded to FAHR Committee that funds be included in next year's budget for
these types of activities. No action was taken on this suggestion.
(6) REPORT OF THE GENERAL MANAGER
The General Manager was not present.
(7) REPORT OF THE ASSISTANT GENERAL MANAGER
Assistant General Manager Blake Anderson reported that"It ain't us." It appears that the recent
contamination is the result of discharges into the Talbert Channel from several Huntington Beach
urban water pumping stations. Diversions are in place to put this flow into the sewer system for
the next 45 days. This includes the dewatering flow from the hotel construction site on Pacific
Coast Highway. The only portion of the beach that is closed is between the river mouth and
Brookhurst The City of Huntington Beach is attempting to characterize the water in the Talbert
Channel and is continuing to look for other sources. The OC Health Care Agency and OCSD will
continue to sample the surfzone twice daily. Recovery and assignment of costs was discussed.
This will be presented to the FAHR Committee and a recommendation will be forwarded to the
Board for a decision at a future meeting.
Mr. Anderson also updated the members on the bankruptcy. Director Swan had requested
information on when the funds would be disbursed. It appears that this will occur on October 5
or 6, after Judge Ryan releases the litigation receipts. OCIP representatives have filed
declarations and these will be taken under consideration by Judge Ryan and could delay
disbursements.
Staff is working on strategies to prevent Kem County from banning biosolids. There is a hearing
on October 5 and only the attorneys will be giving oral testimony. Staff was directed to continue
to follow the State Water Resources Control Board's draft Biosolids EIR, specifically addressing
the dust issue.
(8) REPORT OF THE DIRECTOR OF ENGINEERING
Director of Engineering David Ludwin introduced Matt Smith, the new Engineering Supervisor.
The draft of the Final EIR is being finalized and will be ready for review by the Ad Hoc Committee by
the middle of the month. A determination will be made on when to schedule this meeting at the
September 8 FAHR Committee meeting.
At the last PDC Committee meeting, the members asked to be updated on staff activities regarding
the GWRS project. Jim Herberg reported that two advisory teams have been formed, consisting of
staff members from OCWD and OCSD, that will address technical and management issues.
Schedules and outlines for deliverables have been developed.
' PDC Committee Minutes
Page 3
September 2, 1999
(9) REPORT OF GENERAL COUNSEL
General Counsel was not present.
(10) CHANGE ORDER REPORTS
The Monthly Change Order Reports and the Report of Construction Contracts with Potential Change
Orders over 5% were not reviewed.
(11) ACTION ITEMS (Items a-f)
Because of a lack of a quorum, these items will be considered at the September 22, 1999 regular
Board Meeting. Staff briefed the Directors on these items and comments and/or changes are
noted following each item.
a. PDC 99.39 (1) Ratify Change Order 4 to Orange Park Acres Trunk Replacement,
Contract No. 7-17, with Fleming Engineering, Inc., authorizing a credit of
$38,134, decreasing the total contract amount to $1,423,631; and (2)
accept Orange Park Acres Trunk Replacement, Contract No. 7-17, as
complete, authorizing execution of the Notice of Completion and approving
the Final Closeout Agreement with Fleming Engineering, Inc.
Construction Manager John Linder indicated that this is an adjustment of
engineers quantities change order and the project is complete.
b. PDC 99-40 (1) Ratify Change Order 2 to Fire Alarm and Security System Upgrades,
Job No. J-57,with First Fire Systems, Inc., authorizing a credit of$3,260
and a time extension of 79 calendar days, decreasing the total contract
amount to $357,450.49; and (2) accept Fire Alarm and Security System
Upgrades, Job No. J-57, as complete, authorizing execution of the Notice
of Completion and approving the Final Closeout Agreement.
Staff will revised the agenda report before submitting to the Board to
include the current contract completion date and the actual completion
date.
C. PDC 99-41 (1) Approve a budget increase of$42,196 to Improvements to Miller-
Holder Trunk Sewer System, Reach 3, Contract No. 3-38-3, for a total
revised project budget of$6,386,196, and (2) ratify Change Order 8 to
Improvements to Miller-Holder Trunk Sewer, Reach 3, Contract No.
3-38-3. with Mladen Buntich Construction Company, authorizing an
addition of$35,191 and 26 calendar days, increasing the contract amount
to $5,269,546.
John Linder slated that this contract is complete and the City of La Habra
will be paying about $550,000 for street work performed by the contractor.
That street work did delay the project and liquidated damages have been
calculated. The contractor, Mladen Buntich, has submitted a claim for
additional costs because of the delays. Staff will be negotiating with the
City and the contractor to resolve the claim.
PDC Committee Minutes r
Page 4
September 2, 1999
d. POC 99-42 (1) Approve Addendum 5 to the Professional Services Agreement with
Boyle Engineering Corporation for Improvements to Main Street Pump
Station, Contract No. 7-7-1, providing for additional construction support
services, for an additional amount of$27,687, increasing the total contract
amount to not to exceed $515,632; and (2) and approve a budget
amendment of$27,687, increasing the total project budget to $5,259,687.
John Linder reported that the requested cost is for additional support from
the designer because of job delays.
a. PDC 99-43 Approve Addendum 2 to the Professional Services Agreement with Carollo
Engineers, P.C., for an additional amount of$91,848 and a total amount
not to exceed $2.077,376 for Electrical Power System Studies, Job No.
J-25-4.
Doug Stewart and Jeff Shubik described the changes that necessitated
this addendum, including collecting additional electrical field information,
and enhancing the data base to include the new tagging system provided
by Job No. J-42.
f. PDC 99-35 Adopt Resolution No. OCSD 99-XX, Establishing Policies and Procedures
for the Award of Purchase Orders and Contracts; Award of Public Works
Project Contracts; Award of Professional Services Contracts; and
Delegation of Authority to Implement said Policies and Procedures; and
Repeal Resolution Nos. OCSD 98-8, OCSD 98-12, OCSD 98-22, and
OCSD 9843.
Director Collins asked that this item be returned to the PDC Committee in
October with additional information. Staff will develop a Flow chart that
details how an item is process now and the time it takes staff to prepare
this item and the impact on the project timeline, and also as proposed in
the revised Delegation of Authority resolution.
The item will be pulled from the September 8, 1999 FAHR Committee
Agenda.
(12) INFORMATION ITEMS
a. OMITS 99-33 Discussion of Proposed Changes in SAWPA Governance and Watershed
Management along the Santa Ana River Watershed
Daniel Cozad, SAWPA representative, described the process of deciding
what needs to be done to address the issues surrounding the Santa Ana
River watershed and the responsibilities of the SAWPA Board. The
alternatives to the governance process were described. One option
includes creating a new organization that will be supported by the SAWPA
staff. Members of the new organization that provide funds would be voting
members. A second option would create an advisory committee.
PDC Committee Minutes
Page 5
September 2, 1999
Mr. Cozad also updated the members on the State water bond that is
being considered by the legislators. Director Swan suggested that a
recommendation be made to SAWPA that a written agreement be
executed that provides for listed projects that prove to be non-viable
b. PDC 99-44 Status Report on the Temporary Staffing Program for the Engineering
Department
David Ludwin announced that there are five temporary engineers on staff.
Additional interviews will be scheduled.
(13) CLOSED SESSION
There was no closed session.
(14) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
Director Collins complimented staff on their efforts in addressing the issues surrounding the beach
closure, with a special thank you to Michelle Tuchman for handling the press in such a professional
manner under very stressful conditions.
(15) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
None.
(16) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
None.
(17) FUTURE MEETINGS DATES
The next Planning, Design, and Construction Committee Meeting is scheduled for Thursday,
October 7, 1999, at 5 p.m.
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 6:54 p.m.
Submitted by:
JICL
e n Tappan
Committee Secretary
H:Mp.dtaagendaTDC)PDC99W,MIN5N90299 minO AX
PDC COMMITTEE Meeting Me To a9 9/31/d.Of Dir.
9/]/999
AGENDA REPORT ItemNumW Hem Number
Hem l3(c)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Sid Kirk, Project Manager
SUBJECT: ORANGE PARK ACRES TRUNK REPLACEMENT,
CONTRACT NO. 7-17
GENERAL MANAGER'S RECOMMENDATION
(1) Ratify Change Order No. 4 to Orange Park Acres Trunk Replacement, Contract
No. 7-17, with Fleming Engineering, Inc., authorizing a credit of$38,134, decreasing the
total contract amount to $1,423,631; and (2)Accept Orange Park Acres Trunk
Replacement, Contract No. 7-17, as complete, authorizing execution of the Notice of
Completion and approving the Final Closeout Agreement with Fleming Engineering, Inc.
SUMMARY
Change Order No. 4 is the Adjustment of Engineer's Quantities to Contract No. 7-17.
There is no time extension associated with this change order. Liquidated damages on
this contract are $1,000 per calendar day and there are no bonus provisions. This
project has been completed.
Contract Start Date August 21, 1998
Original Contract Completion Date April 27, 1999
Total Number of Change Orders to Date 4
Current Contract Completion Dale May 24, 1999
Actual Completion Date May 24, 1999
Days Subject to Liquidated Damages 0
Liquidated Damage Assessment 0
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $1.317,530.
Previous Authorized Changes 144,235.
This Change (Deduct) (38,134.)
Change Orders to Date 106,101.
Percentage Increase 8.05%
Amended Contract Price $1,423,631.
BUDGETIMPACT
® This item has been budgeted. (Line item: Zone 5, Item b)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
Contract No. 7-17, Orange Park Acres Trunk Sewer Replacement, consists of the
construction of a new gravity sewer with manholes and upgrading the existing 12-inch
sewer to a 21-inch sewer from Orange Park Boulevard to 400-feet beyond Meads
Avenue. The plans and specifications for this contract were prepared by Boyle
Engineering. The contract is 100% complete. The construction contract was awarded
to Fleming Engineering Inc. on June 24, 1998.
The following table summarizes the Change Order:
ITEM DESCRIPTION AMOUNT DAYS TYPE
NO.
1 Adjustment of Engineers $(38,134) 0 Other
Quantities
Total Change Order No. 4 $ 38,134
This item adjusts the contract bid items to the actual quantities incorporated into the
work. See the attached change order for more information.
ALTERNATIVES
None.
CEQA FINDINGS
None.
ATTACHMENTS
Budget Information Table
Change Order Status Report
Change Order
SK:Ic
%tobaWatal\nlglobaMgenda Draft RepodsTDC\7-17C0"RSepLdoc
BUDGET INFORMATION TABLE
ORANGE PARK ACRES TRUNK REPLACEMENT
CONTRACT NO. 7-17
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECTlTASK AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE EXPENDED
BUDGET BUDGET INCREASE BUDGET TO DATE REQUEST AUTHORIZATION TO DATE TO DATE(%)
Project Development $ $
Design Staff $ 9,600 $ 9,600 $ 9,600 $ 9,600 $ 9,600 $ 9,600 100%
Consultant PSA I $ 23.968 $ 36,660 $ 36,660 $ 36 660 $ 36,660 $ 36,660 100%
Construction Contrail 1 $ 702000r461,765 $ 1,461,785 $ 1,461,765 $ 38134 $ 1423,631 $ 1,315521 93%
Construction Other $ b
Construction Staff $ 38,400 $ 177.175 $ 177 175 $ 177175 $ 60.345 34%
Contin enc b bTOTAL $ 773.968 $ - $ 1,685,200 $ 1,685.200 $ (38,134) $ 1,647,066 $ 1.423,631 86%
CHANGE ORDER STATUS REPORT
ORANGE PARK ACRES TRUNK REPLACEMENT
CONTRACT NO. 7-17
ITEM
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED DATE COST TO DATE INCREASE TIME TIME TO DATE
(DAYS) (DAYS)
CONTRACT 8121/98 $ 1,317,530.00 $ 1,317,530.00 0.00% 250 250
CO NO. 1' 3/10/99 $ 33,291.00 $ 1,350,821.00 2.53% 10 260
CO NO. 2' 618/99 $ - $ 1,350,821.00 2.53% 0 260
CO NO. 3 7121/99 $ 110,944.00 $ 1,461,765. 12 10.95% 17 277
CO NO, 4 PENDING $ (38,134.00) $ 1,423,631.00 8.05% 0 277
Approved by GM per delegated authority by Board Resolution 98-8
a -
Page 1 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Flemina Enaineerino, Inc. C.O. No.: Four (4)
Date: September 22. 1999
Job: Orange Park Acres Trunk Replacement, Contract No. 7-17
Counsultant: Bovle Enaineerino Corporation
Amount of this Change Order(Add)(Deduct) $(38. 334.00)
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation therefor,the following additions to or
deductions from the contract price are hereby approved.
ITEM 1 -ADJUSTMENT OF ENGINEER'S QUANTITIES
DEDUCTIONS
Item No. Unit Description From To Difference Unit Price Total
4. L.F. 21-inch VCP 260 249.00 11.00 330 (3,630.00)
5. L.F. 42-inch Casing 30 0.00 30.00 1.100 (33,000.00)
6. V.F. 60-inch ID MH 230 225.80 4.20 358 (1,504.00)
Total Deduction $(38,134.00)
TOTAL CREDIT THIS CHANGE ORDER: $(38,134.00)
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 2 of 3 v
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Fleming Engineering, Inc. C.O. No.: Four (4)
Date: September 22, 1999
Job: Orange Park Acres Trunk Replacement Contract No 7-17
Counsultant: Boyle Engineering Corporation
The additional work contained within this change order can be performed incidental to the prime work
and within the time allotted for the original contract and any extensions to the contract time made by
this and all previously issued change orders. It is therefore mutually agreed that no extension of time
to perform the work is required for this change order, and that no direct or indirect, incidental or
consequential costs, expenses, losses or damages have been or will be incurred by contractor, except
as expressly granted and approve by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Date: August 21, 1998
Original Contract Time: 250 Calendar Days
Original Completion Date: April 27, 1999
Time Extension this C.O.: 0 Calendar Day
Total Contract Time Extension: 27 Calendar Day
Revised Contract Time: 277 Calendar Days
Revised Final Completion Due Date: May 24, 1999
Time Subject to Liquidated Damages: Not Applicable
Actual Final Completion Date: Not Applicable
Original Contract Price $ 1,317,530.00
Prev. Authorized Changes $ 144,235.00
This Change (Add) (Deduct) $ (38,134.00)
Amended Contract Price $ 1,423,631.00
' Page 3 of 3
ORANGE COUNTY SANITATION DISTRICT
108"ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Fleming Engineering Inc. C.O. No.: Four (4)
Date: September 22, 1999
Job: Orange Park Acres Trunk Replacement, Contract No. 7-17
Counsultant: Boyle Engineering Corporation
Board Authorization Dale: September 22, 1999
ORANGE COUNTYSANITATION DISTRICT
Submitted by:
Construction Manager Date
Approved by:
Director of Engineering Date
Accepted by:
FLEMING ENGINEERING, INC.
Contractor Date
PDC COMMITTEE Mee11 Date To Sd.of Dir.
9/7/99 su99
AGENDA REPORT IMMNumbC IlemNumber
PDC99-Q Item 13(d)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Dean Fisher, Project Manager
SUBJECT: FIRE ALARM AND SECURITY SYSTEM UPGRADES
JOB NO. J-57
GENERAL MANAGER'S RECOMMENDATION
(1) Ratify Change Order No. 2 to Fire Alarm and Security System Upgrades, Job
No. J-57, with First Fire Systems, Inc. authorizing a credit of$3,260, and a time
extension of 79 calendar days, decreasing the total contract amount to $357,450.49;
and (2) Accept Fire Alarm and Security System Upgrades, Job No. J-57, as complete,
authorizing execution of the Notice of Completion and approving the Final Closeout
Agreement.
SUMMARY
Change Order No. 2 includes one item of deleted work and a time extension to Job
No. J-57. There are no errors associated with this change order. Liquidated damages
on this contract are $50 per day and there are no bonus provisions. This project has
been completed.
Contract Start Date April 27, 1998
Original Contract Completion Dale January 21, 1999
Total Number of Change Orders to Date 1
Current Contract Completion Date May 14, 1999
Actual Completion Date May 14, 1999
Days Subject to Liquidated Damages 0
Projected Liquidated Damage Assessment 0
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $354,341.49
Previously Authorized Changes 6,369.00
This Change (Delete) (3,260.00)
Change Orders to Date 3,109.00
Percentage Increase 0.88%
Amended Contract Price $357,450.49
BUDGETIMPACT
® This item has been budgeted. (Line item: CIP, Inter-Plant and Joint Facilities, Item 2c)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
R�: wove Pagel
ADDITIONAL INFORMATION ,
Job No. J-57, Fire Alarm and Security System Upgrades, includes installation of new
fire alarm equipment in the Administration Building, Control Center, Operations Center,
Laboratory, Human Resources Building and other buildings with network connectivity
and integration into the security system. Lee and Ro prepared the plans and
specifications and the contract was awarded to First Fire Systems on February 24,
1998. The contract is complete. The following summarizes the change order.
Item Description Amount Days Type
No.
1 Delete Security System Integration $ 3 260 0 Design Change
2 Additional Contract Time For 79 Other
Software Delays
TOTAL— Change Order No. 2 $3,260 79
All of the above items would have been included in the scope of the original contract if
discovered or known in the design phase. There is no rework or consultant
reimbursement associated with this change order.
Software delays are a result of the manufacturer, Edwards System Technology's (EST),
delays in getting the latest software version into the market. All of the equipment and
software on the project is manufactured by EST and provided by the Contractor in
accordance with a pre-purchase agreement entered into by the District and EST prior to
the bid. At the time of the bid, the latest version of the software was to be available by
late1998. This would allow for a timely completion of the project. As time progressed,
the delivery date for the software was extended. Staff and Contractor agreed to delay
the completion of the project and wait for the new software. The District did this in order
to save reprogramming costs once the new version is available. The latest version
adds significant functionality, as well as reduced administration time and system
diagnostics.
ALTERNATIVES
None
CEQA FINDINGS
This project is exempt from CEQA requirements. A notice of exemption was filed on
March 17, 1993.
ATTACHMENTS
Budget Information
Change Order Status Report
Change Order
DF:Ic
G:NiglobaKAgenda Draft ReportSTDCU-57 COA AR.dot
R.n..a aaoso Page 2
BUDGET INFORMATION TABLE
FIRE ALARM AND SECURITY SYSTEM UPGRADES
JOB NO. J-57
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECWTASK AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE EXPENDED
BUDGET BUDGET INCREASE BUDGET TO DATE REQUEST AUTHORIZATION TO DATE TO DATE(%)
Project Development $ - $ 828 $ 828 $ 828 $ 828 $ 828 100%
Design Staff $ 1540 $ 13,321 $ 13,321 $ 13,321 Is 13,321 $ 13,321 100%
Consultant PSA is - $ $ $ $ 0%
Construction Contract $ 335,000 $ 360,710 $ 360.710 $ 360710 $ 3,260 $ 357,450,49 $ 357257 100%
Construction Other ' $ 133,000 $ 166,383 $ 166,383 $ 166,383 $ 166.383 $ 151,176 91%
Construction Staff" $ 37,460 $ 108,758 $ 108,758 $ 108,758 $ 100,758 $ 88.977 82%
Conlin enc $ - $ $ $ $ - $ 0%
TOTAL 1 $ 507.000 $ 650,000 $ - $ 650,000 1 $ 650,000 $ (3,260)1 $ 646,740 1 $ 611,559 1 95%
Note-"Construction(Other)"category includes costs within budget designated for Information Technology to install Fiber Optic network backbone.
Note-"Construction Staff category includes all costs not specifically associated with other categories(e.g. training, legal fees, testing contractor's, etc.)
h:Mp.d W%enggebs..¢57WudgenCO 2 Budget Table.Ns
Form Revised 1W171ea
CHANGE ORDER STATUS REPORT
Fire Alarm and Security System Upgrades
Job No. J-57
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED TIME
ITEM TIME TO DATE
DATE COST TO DATE INCREASE
(DAYS) (DAYS)
CONTRACT 2/24/1998 $ 354,314.49 $ 354.341.49 0.00 270 270
CO NO. 1 5/26/1999 $ 6.369.00 $ 360.710.49 1.80 35 305
CO NO. 2 Pending $ (3,260.00) $ 357,450.49 (0.88) 79 384
hAwp.dta%eng%jobs..1j-571C0 Status Report.xis
�0
Page 1 of 3
ORANGE COUNTY SANITATION DISTRICT
108"ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. First Fire Systems, Inc. C.O. No.: Two (2)
Date: September 22, 1999
Job: Fire Alarm and Security System Upgrades, Job No. J-57
Consultant: Lee and Ro Engineers
Amount of this Change Order~(Deduct) ($3.260.00)
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation, the following additions to or deductions from
the contract price are hereby approved.
ITEM 1 — DELETE SECURITY SYSTEM INTEGRATION
This change order item deletes the work, including labor, materials, equipment and services, for
programming and integration of the new EST3 Fire Alarm System with the CASI-Rusco existing
security system interface. This work is described in Detailed Specification 64-0304 and identified in the
Construction Agreement as Item No. 28 in Exhibit"A", Schedule of Prices. This integration will be
provided by CASI-Rusco in the future. This item was negotiated with the contractor pursuant to
Section 10-6(B)2(a) of the General Provisions.
CREDIT COST THIS CHANGE ORDER ITEM: ($ 3.260.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2—ADDITIONAL CONTRACT TIME FOR SOFTWARE DELAYS
This change order item adds time to the contract due to delayed delivery of the manufacturer's
software revisions. All of the equipment is provided under a pre-purchase agreement between the
District and the manufacturer. At the time of bid, the manufacturer stated the latest version of the
software would be available in late-1998, which would allow for a timely completion of the project. In
January 1999 it became apparent that the software was not going to be made available according to
schedule. Staff, together with the Contractor, decided to delay the completion in order to implement
the project with the newer software. The District did this in an effort to save staff time to reprogram the
system at a later date. This item is a time extension only and negotiated with the contractor pursuant
to Section 64 of the General Provisions.
ADDED COST THIS CHANGE ORDER ITEM: $0.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 79 Calendar Days
TOTAL CREDIT COSTS THIS CHANGE ORDER: ($ 3,260.00)
TOTAL TIME EXTENSION THIS CHANGE ORDER: 79 Calendar Days
Page 2 of 3 9
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. First Fire Systems, Inc. C.O. No.: Two (2)
Date: September 22, 1999
Job: Fire Alarm and Security System Uporades. Job No. J-57
Consultant: Lee and Ro Enoineers
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that a 79 calendar day
time extension is required for this Change Order, but that no direct or indirect, incidental or
consequential costs, expenses, losses or damages have been or will be incurred by Contractor, except
as expressly granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: April 27, 1998
Original Contract Time: 270 Calendar Days
Original Completion Date: January 21, 1999
Time Extension this C.O.: 79 Calendar Days
Total Contract Time Extension: 114 Calendar Days
Revised Contract Time: 384 Calendar Days
Revised Final Completion Due Date: May 14, 1999
Time Subject to Liquidated Damages: 0 Calendar Days
Actual Final Completion Date: May 14, 1999
Original Contract Price $ 354,341.49
Prev. Authorized Changes $ 6,369.00
This Change (Deduct) $ (3,260.00)
Amended Contract Price $ 357.450A9
Page 3 of 3
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: First Fire Systems, Inc. C.O. No.: Two (2)
Date: September 22, 1999
Job: Fire Alarm and Security System Upgrades, Job No. J-57
Consultant: Lee and Ro Engineers
Board Authorization Dale: September 22, 1999
ORANGE COUNTY SANITATION DISTRICT
Recommended by:
Construction Manager Date
Approved by:
Director of Engineering Date
Accepted by:
First Fire Systems, Inc.
Contractor Date
H kwp.cta\engUOBS 8 CONTRACTSU-57\CO2.doc
PDCCOMMITTEE neetmgDx ToBd.OUX-
912M 9,22/99
AGENDA REPORT IWM Number Item Number
PDC99-41 13(e)
County Sanitation Districts of Orange County,California
FROM: David Ludwin, Director of Engineering
Originator: Sid Kirk, Project Specialist
SUBJECT: CHANGE ORDER TO IMPROVEMENTS TO MILLER-HOLDER TRUNK
SEWER SYSTEM, REACH 3, CONTRACT NO. 3-38-3, AND CITY OF LA
HABRA STREET IMPROVEMENTS FOR EASTBOUND RIGHT TURN
LANE AT IMPERIAL HIGHWAY/IDAHO STREET INTERSECTION,
PROJECT NO. 2-R-97
GENERAL MANAGER'S RECOMMENDATION
(1) Ratify Change Order No. 8 to Improvements to Miller-Holder Trunk Sewer System,
Reach 3, Contract No. 3-38-3, with Mladen Buntich Construction Company authorizing
an addition of$85,191 and 26 calendar days, increasing the contract amount to
$5,269,546, and (2)Approve a budget increase of$42,196 to Improvements to Miller
Holder Trunk Sewer System, Reach 3, Contract No. 3-38-3, for a total revised project
budget of$6,386,196.
SUMMARY
Change Order No. 8 includes seven items of added work to Contract No. 3-38-3. Items
2 and 6 are design changes and Items 1, 3, 4, 5, and 7 are changed conditions. There
are 26 days time extension associated with this change order. Liquidated damages on
this contract are $750 per day and there are no bonus provisions. The budget for this
project is increased from $6,344,000 to $6,386,196 to provide additional funds for this
change order.
Contract Start Date October 1, 1997
Original Contract Completion Date November 24, 1998
Total Number of Change Orders to Date 8
Current Contract Completion Date March 9, 1999
Actual Completion Date June 9, 1999
Days Subject to Liquidated Damages 92
Liquidated Damages Assessment $69,000
PROJECT/CONTRACT COST SUMMARY
Original Contract Price $4,587,000
Previous Authorized Change $ 597,355
This Change Order (add) $ 85,191
Change Orders to Date $ 682,546
Percentage Increase 14.88%
Amended Contract Price $5,269,546
HMp.IXabpw-0a MAp Pepsr %IM6v Ige "R@px mtxelda
e,„,a, 1. Page 1
BUDGETIMPACT
❑ This item has been budgeted. ,
® This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
The cost for this construction contract task has overrun the current budget. Funds for
this cost overrun are being provided by remaining contingency funds and by the request
for an addition of$42,196 for the project.
ADDITIONAL INFORMATION
Contract No. 3-38-3, Improvements to Miller-Holder Trunk Sewer System, Reach 3, and
Project No. 2-R-97, City of La Habra Street Improvements for Eastbound Right Turn
Lane at Imperial Highway/Idaho Street Intersection, consists of constructing a new trunk
sewer with manholes in Imperial Highway from Beach Boulevard to Harbor Boulevard.
The new sewer varies in size from 24-inches to 39-inches. The plans and specifications
for this contract were prepared by Boyle Engineering. The construction contract was
awarded to Mladen Buntich Construction, Inc. in August 1997. The job is 100%
complete.
The following table summarizes the change order:
Item Description Amount Days Type
No.
1 Undisclosed Utilities $ 6,563.00 3 Changed Condition
2 Modify Lateral MH Conn. $ 4,260.00 2 Design Change
3 Maintain Target Store Access $ 15,250.00 6 Changed Condition
4 Additional Work $ 13,515.00 5 Changed Condition
5 Undisclosed Encasement $ 14,000.00 1 Changed Condition
6 City of La Habra Changes $ 23,815.00 9 Design Change
7 Install Traffic Sig. Loos $ 7,788.00 0 Changed Condition
Total $85,191.00 26
These items would have been included in the scope of the original contract if discovered
in the design phase.
ALTERNATIVES
None
CEQA FINDINGS
N/A
G NIpbNNpxMa Pall Repp4+^pR'118.'1C09I.R Ox
RaxaN + Page 2
ATTACHMENTS
✓ Change Order
Budget Information Table
Change Order Status Report
SK:Ic
cwmrca.a,wpm.raama.onn wo��onxxawan.ae
R. ,� Page 3
BUDGET INFORMATION TABLE
Improvements to Miller Holder Trunk Sewer, et al
Contract 3-38-3, et al
ORIGINAL CURRENT PROPOSED PROPOSED FUNDS THIS PROPOSED ESTIMATED ESTIMATED
PROJECT/TASK AUTHORIZED PROJECT BUDGET REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE EXPENDED
BUDGET BUDGET(t) INCREASE BUDGET TO DATE REQUEST AUTHORIZATION TO DATE TO DATE(%)
Pro)ecl Development $ $
Design Staff $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 100%
Consultant PSA $ 125.000 1 $ 125.000 $ 105.000 $ 105.000 $ 104,000 99%
Construction Contract
1 $ 3.000,000 $ 5,184,355 $ 85,191 $ 5,269,546 $ 5,184.355 $ 85191 $ 5.269.546 $ 5.183,843 98%
Construction Other $ $
Construction Staff $ 200,000 $ 941.650 $ 941,650 $ 941.650 $ 941,650 $ 912.058 100%
Contingency $ 42,995 S 42995 E 8
TOTAL $ 3,250,000 1 $ 6,344,000 $ 42,196 $ 6,386,196 $ 6,281,005 $ 85,191 $ 6,366,196 $ 6,249,901 98%
(1) The contraction contract budget includes $330,856 for Project No. 2-R-97 which will be reimbursed by the City of La Habra
h:Wp.ftWng1t msWudgM WWe
Form Revised 1V1 7198
CHANGE ORDER STATUS REPORT
Improvements to Miller-Holder Trunk Sewer System
Contract No. 3-38-3, et al
APPROVAL CONTRACT CONTRACT COST PERCENTAGE AUTHORIZED AUTHORIZED
ITEM DATE COST TO DATE INCREASE TIME TIME TO DATE
(DAYS( (DAYS)
CONTRACT 1011/97 $ 4,587,000 S 4,587,000 0.00% 420 420
CO NO. 1• 3/19/98 $ 46,831 $ 4,633,831 1.02% 0 420
CO NO. 2• 4/21198 $ 35,562 $ 4,669,393 1.80% 7 427
CO NO. 3•• 6/24/98 $ 49,488 $ 4,718,881 2.88% 0 427
CO NO.4 8127/98 $ 353,988 $ 5,072,869 10.59% 46 473
CO NO. 5•• 1018/98 $ 39,889 $ 5,112,758 11.46% 9 482
CO NO. 6• 10/10/98 $ - $ 5,112,758 0.00% 0 482
CO NO. 7 5/26/99 $ 71,597 $ 5,184,355 13.02% 17 499
CO N08 Pending $ 115,191 $ 5,269,546 14.88% 26 525
Approved by GM per delegated authority by Board Resolution 98-8
••Approved by PDC Committee per delegated authority by Board Resolution 98-8
&3 :co hngste
w
Page 1 of 6
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. MLADEN BUNTICH CONSTRUCTION, INC. C.O. No.: Eight (8)
Date: September 22. 1999
Job: Improvements To Miller-Holder Trunk Sewer System, Reach 3. Contract
No. 3-38-3, And City of La Habra Street Improvements For An Eastbound Riaht-
Tum Lane At The Imperial Highway/Idaho Street Intersection, Project No. 2-R-97
Amount of this Change Order(Add) (Deduct) $85.191.00
In accordance with contract provisions, the following changes in the contract and/or
contract work are hereby authorized and as compensation, the following additions to or
deductions from the contract price are hereby approved.
ITEM 1 — UNDISCLOSED UTILITIES
This item is for providing labor, equipment and materials to make repairs to and compensate the
Contractor for delays encountered for the following unmarked utilities:
• A 3-inch electrical conduit at Station 253+40 damaged during excavation delayed pipe laying
until repairs to the conduit could be made.
• A 10-inch concrete pipe crossing the trench at Station 261+35 delayed shoring installation
while the Contractor investigated whether the pipe could be removed.
• A 6-inch waterline crossing the trench at Station 263+63 delayed the pipe installation. The
Contractor was directed to provide support for the pipe.
• A 10-inch tar wrapped steel pipe was found which delayed the pipe installation. The pipe
was hot tapped to determine ils content.
This item was accomplished by Contractor's force account pursuant to Section 10-6(B)2(b) of the
General Provisions. (Reference FCO 3383-30)
ADDED COST THIS CHANGE ORDER ITEM: $6,563.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 3 Calendar Days
ITEM 2 - MODIFICATION OF LATERAL MANHOLE CONNECTION
This item compensates the Contractor for providing labor, equipment, and materials to modify the
existing 48-inch manhole located to the right of Station 264+75. This eliminated a planned 48-
inch I.D. manhole that would have severely impacted a local business. The modification resulted
in reducing two bid items by$9,218 for a net credit of$4,958. This item was accomplished by
Contractor's force account pursuant to Section 10-6(B)2(b) of the General Provisions.
(Reference FCO 3383-23)
ADDED COST THIS CHANGE ORDER ITEM: $4,260.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 2 Calendar Days
Page 2 of 6
ORANGE COUNTY SANITATION DISTRICT
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. MLADEN BUNTICH CONSTRUCTION, INC. C.O. No.: Eiaht (8)
Date: September 22. 1999
Job: Improvements To Miller-Holder Trunk Sewer System, Reach 3. Contract
No. 3-38-3. And City of La Habra Street improvements For An Eastbound Right-
Turn Lane At The Imperial Hiahwavlldaho Street Intersection, Project No. 2-R-97
ITEM 3- MAINTAIN ACCESS TO TARGET STORE BEYOND CONTRACT REQUIREMENTS
DURING THE HOLIDAYS
This item is to compensate the contractor for maintaining the three driveway entrances for
customer access to Target Store, thereby reducing the impact of construction during the
Christmas holidays. This item was accomplished by Contractor's force account pursuant to
Section 10-6(B)2(b) of the General Provisions. (Reference FCO 3383-31)
ADDED COST THIS CHANGE ORDER ITEM: $15,250.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 6 Calendar Days
ITEM 4 -ADDITIONAL WORK NOT COVERED BY CONTRACT DOCUMENTS
This item compensates the Contractor for additional work performed and delays due to changed
conditions. Included are;
• While installing the bore pit at Station 254+40, an adjacent light standard was in
jeopardy of being damaged due to the close proximity of the shoring piles. The
Contractor was directed to remove, store and reinstall the light standard after
completion of the bore.
• Pour one-sack slurry to support sewer lateral at Station 260+88.
• In the vicinity of Station 265+60, backfill material over the adjacent Imperial Trunk
Sewer was poorly consolidated and caved into the Miller-Holder sewer trench. This
caused considerable delay in the installation of the beam and plate shoring on the
north side of the trench.
• Provide and install an adapter coupling from an 8-inch steel pipe to the 8-inch VCP on
an existing drop manhole at Station 180+22.
• Provide for the removal of a concrete encasement at Station 201+00 not shown on
the plans and the resulting delay.
• Install stop logs at manhole Station 159+97 which was not a part of this contract, but
was done under the direction of District personnel.
• Provide assistance to the City of La Habra maintenance crew after they damaged the
Contractors bypass set-up at manhole Station 188+92. Work involved retrieving
sewer line plug, resetting the plug, and temporary bypass pumping upstream until the
plug reset. This will be back charged to the City.
This item was accomplished by Contractors force account pursuant to Section 10-6(B)2(b) of the
General Provisions. (Reference FC03383-32)
Page 3 of 6
ORANGE COUNTY SANITATION DISTRICT
1015" EWS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor. MLADEN BUNTICH CONSTRUCTION, INC. C.O. No.: Eiaht (8)
Date: September 22, 1999
Job: Improvements To Miller-Holder Trunk Sewer System, Reach 3. Contract
No. 3-38-3 And City of La Habra Street Improvements For An Eastbound Right-
Turn Lane At The Imperial Hinhwav/Idaho Street Intersection, Proiect No. 2-R-97
ADDED COST THIS CHANGE ORDER ITEM: $13,515.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 5 Calendar Days
ITEM 5 - REMOVAL AND REPLACEMENT OF UTILITY ENCASEMENT
The Contractor found a utility encased in concrete located over the new 21-inch sewer line at
Station 266+20. The plans show no concrete encasement and utilities 4-feet east of the sewer.
The item is to compensate the Contractor for the delay and the removal of interfering concrete
and the replacement of the concrete encasement. This item was accomplished by Contractor's
force account pursuant to Section 9-6(a) of the General Provisions. (Reference FCO 3383-33)
ADDED COST THIS CHANGE ORDER ITEM: $14,000.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 1 Calendar Days
ITEM 6- CITY OF LA HABRA APPROVED FIELD CHANGE ORDERS
This item is to compensate the Contractor for additional labor, equipment, and materials to
perform work for a design change, pertaining to the plans prepared by the City for Project
No. 2-R-97, and will be back charged to the City
• Remove concrete overburden at catch basin in SE Quadrant of Idaho/imperial and
abandoned concrete traffic pole pedestal in the SW quadrant of Idaho/Imperial.
Relocate new traffic pole from planned location and install new pedestrian crossing
push-button post.
• Place extra striping for traffic detour on Idaho north of Imperial.
• Furnish and apply color coating material on the concrete retaining wall and retaining
curb parallel to the right turn pocket.
• To make corrections in the cross gutter drainage on Idaho Street, additional asphalt
grinding and clean-up, which extended the work day and delayed the completion of
the surface paving.
• Install additional conduit and pull box connection and coordinate with Edison for traffic
signal shutdown to complete installation on Idaho.
This item was accomplished by Contractor's force account pursuant to Section 10-6(B)2(b) of the
General Provisions. (Reference FCO 3383-25, 28, 34, and 35)
v
Page 4 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: MLADEN BUNTICH CONSTRUCTION, INC. C.O. No.: Eight (8)
Date: September 22, 1999
Job: Improvements To Miller-Holder Trunk Sewer System Reach 3. Contract
No. 3-38-3. And City of La Habra Street Improvements For An Eastbound Riaht-
Tum Lane At The Imperial HighwaylIdaho Street Intersection Project No. 2-R-97
ADDED COST THIS CHANGE ORDER ITEM: $23,815.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 9 Calendar Days
ITEM 7 - INSTALL ADDITIONAL TRAFFIC LOOPS
This item compensates the Contractor for installing additional traffic loops from Beach Boulevard
to Harbor Boulevard that were not shown in the Contract documents. This item was
accomplished by Contractor's farce account pursuant to Section ID-6(B)2(b) of the General
Provisions.
ADDED COST THIS CHANGE ORDER ITEM: $7,788.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Day
TOTAL COST THIS CHANGE ORDER: $85,191.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 26 Calendar Days
`a
Page 5 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: MLADEN BUNTICH CONSTRUCTION, INC. C.O. No.: Eiaht (8)
Date: September 22, 1999
Job: Improvements To Miller-Holder Trunk Sewer System, Reach 3. Contract
No. 3-38-3, And City of La Habra Street Improvements For An Eastbound MOM-
Turn Lane At The Imperial HighwaylIdaho Street Intersection, Project No. 2-R-97
The additional work contained within this change order can be performed incidental to the prime
work and within the time allotted for the original contract and any extensions to the contract time
made by this and all previously issued change orders. It is therefore mutually agreed that a 26
day time extension is required for this change order, and that no direct or indirect, incidental or
consequential costs, expenses, losses or damages have been or will be incurred by Contractor,
except as expressly granted and approved by this change order.
SUMMARY OF CONTRACT TIME
Original Contract Dale: October 1, 1997
Original Contract Time: 420 Calendar Days
Original Completion Date: November 24, 1998
Time Extension this C.O.: 26 Calendar Days
Total Contract Time Extension: 105 Calendar Days
Revised Contract Time: 525 Calendar Days
Revised Final Completion Due Date: March 9, 1999
Time Subject to Liquidated Damages: 92 Calendar Days
Actual Final Completion Date: June 9, 1999
Original Contract Price $4,587,000.00
Prev. Authorized Changes $ 597,355.00
This Change Changes (Add) $ 85,191.00
Amended Contract Price $ 5,269,546.00
u
Page 6 of 6
ORANGE COUNTY SANITATION DISTRICT
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: MLADEN BUNTICH CONSTRUCTION, INC. C.O. No.: Eight (8)
Date: September22. 1999
Job: Improvements To Miller-Holder Trunk Sewer System, Reach 3. Contract
No. 3-38-3. And City of La Habra Street Improvements For An Eastbound Right-
Turn Lane At The Imperial Highway/Idaho Street Intersection, Project No. 2-R-97
Board Approval Date: September 22, 1999
ORANGE COUNTY SANITATION DISTRICT
Submitted by:
Construction Manager Date
Approved by:
Director of Engineering Date
Accepted by:
MLADEN BUNTICH CONSTRUCTION, INC.
Contractor Date
PDC COMMITTEE Meed,, Me ToBd.aDr.
9-z-99 B-zz-99
AGENDA REPORT Item Number Item Number
PDC99-42 I3(r)
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Tod Haynes, Engineering Supervisor
SUBJECT: IMPROVEMENTS TO MAIN STREET PUMP STATION,
CONTRACT NO. 7-7-1
GENERAL MANAGER'S RECOMMENDATION
(1) Approve a budget amendment of$27,687 increasing the total project budget to
$4,259,687, and (2) Approve Addendum No. 5 to the Professional Services Agreement
with Boyle Engineering Corporation for Improvements to Main Street Pump Station,
Contract No. 7-7-1, providing for additional construction support services, for an
additional amount of$27,687, increasing the total contract amount not to exceed
$515,632.
SUMMARY
The Professional Service Agreement (PSA) between Boyle Engineering and the District
includes consultant support services to District staff during the construction phase of
this contract. The completion of this contract has been delayed by electrical changes,
additional work associated with the installation of an underground fuel tank, and pump
vibration and cavitation problems. These delays have extended the time period for
consultant construction support services.
As a result, additional funds in the projected amount of$27,687 are required to provide
for consultation and advice from Boyle Engineering to the District to complete the
project.
Additionally, a budget increase of$27,687 is requested to cover Addendum No. 5. Staff
projections indicate budget funds will be insufficient at contract completion. An
additional budget increase will be requested in a future change order for staff labor and
overhead costs associated with the project delays, and to cover change order work.
PROJECT/CONTRACT COST SUMMARY
See attached Budget Information Table,
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
® This item has been budgeted, but there are insufficient funds.
(Line Item:Zone 7, Item b; Zone 14, Item a)
❑ This item has not been budgeted.
❑ Not applicable (information item)
The total agreement amount shown in the Professional Services Agreement Status
Report provides services for the previous Abandonment of Nine District No. 7 Pump
Stations Project, Project No. 7-14, and the subject project. Project No. 7-14 is
complete.
The proposed Consultant PSA budget shown on the Budget Information Table is for
services provided on this project only.
ADDITIONAL INFORMATION
This project adds a permanent generator building and outfits the second half of the Main
Street Pump Station with five new pumps and motors and two variable frequency drives
(VFDs). The existing side of the station will receive two new VFDs. The plans and
specifications for this contract were prepared by Boyle Engineering. The construction
contract was awarded to Sverdrup Civil, Inc. on April 23, 1997. The contract is 97%
complete.
The original agreement between Boyle Engineering and the District, dated February 14,
1990, was in the amount of$216,168. Four addenda have been added since,
increasing the total amount to $487,945. Three of these four addenda were added
during the design phase, and one was added at the beginning of construction. The
original completion date of the construction contract was June 27, 1998. The contract
has been delayed, with completion projected to be September 30, 1999. The majority
of the delays can be attributed to electrical changes, unforeseen permit requirements
associated with the installation of an underground fuel tank, and resolution of pump
vibration and cavitation problems.
The District has been utilizing Boyle Engineering for consultation and advice during the
construction phase. Additional funds in the amount of$27,687 are required to continue
to receive Boyle's services until the projected contract completion date. This amount
will compensate Boyle Engineering for additional consultation and advice to the District
during the final phase of construction, witnessing of final testing, and preparation of
record drawings.
The requested budget increase of$27,687 will provide funds for Addendum No. 5 to the
Professional Service Agreement with Boyle Engineering. At this time, 94% of the
current budget has been expended. Staff projections place budget expenditures at
107% of the current budget at the expected contract completion date of September 30,
1999. The majority of these additional costs will cover electrical change orders with
associated delays. Other additional costs stem from smaller changes including work on
existing valves and the installation of corrosion protection for existing force mains.
Additional staff labor, overtime, and associated overhead costs are required for District's
construction management efforts during the extended contract period. An additional
budget increase will be requested in a future change order to provide for projected
additional funds needed to complete the contract.
ALTERNATIVE
None
CEQA FINDINGS
This project was included in the Programmatic EIR for the 1989 Master Plan. The final
EIR was approved on July 19, 1998 and the Notice of Determination was filed on
July 30, 1989.
ATTACHMENTS
Budget Information Table
PSA Status Report
MB:Ic
G intglobaRAgenda Draft ReportsTMAR 7.7.1 Aeeentlum No.5 to PSA and Budget Incnamdoc
BUDGET INFORMATION TABLE
IMPROVEMENTS TO MAIN STREET PUMP STATION
CONTRACT NO. 7-7-1
a� i;; i n ORI¢INAL ,') CURRENT "PROPOSED PROP056 FUNDS - THIS PROPOSED ESTIMATED ESTIMATED
PROFICT/TASK- RUTHORIZEO• �PROJECT,-; t-BUDGET REVISED I- AUTHORREDTO AUTHORIZATION TOTAL EXPENDITURE EXPENDED
s BUDGET BUDGET INCREASE BUDGET DATE - REQUEST AUTHORIZATION?* TO DATE TO DATE(%)
Project Development $ $
Design Stag $ 83,000 $ 83,000 $ - $ 83,000 $ 83,000 $ 83,000 $ 83.000 1 100%
Consultant PSA $ 212,000 $ 360,351 $ 27.687 $ 388,038 ' $ 360,351 $ 27,887 $ 388,038 $ 360,251 93%
Construction Contract $ 690.000 $ 2,656,974 $ - $ 2.656,974 - $ 2.656,974 $ - $ 2,656,974 $ 2,473,731 93%
Construction(Other) $ $
Construction Staff $ 265.000 $ 1.131,675 $ - $ 1,131,675 $ 1,131,675 $ - $ 1,131.675 $ 1,076,380 95%
Contingency $ - $ - $ $
TOTAL $ 1,250,000 $ 4,232,000 $ 27,687 $ 4.259,687 $ 4,232,000 $ 27,687 1 $ 4.259,687 $ 3,993.362 1 94%
'Does not include amount for Project 7-14 which is included in original PSA
Budget Into TaareM AR For ADD No.s To PSAwW Budge M eu,
Form Re dsud lWiMS
Professional Services Agreement Status Report
Contract No. 7-7-1
Improvements to Main Street Pump Station
Total Project Budget: $ 4,232,000'
Consultant: Boyle Engineering
Start Date of Project: February 14, 1990
Date Addendum Description Cost Accumulated
Costs
2/14/90 Original PSA Design of Improvements to Main Street Pump $ 216,168 $ 216,168
Station
2/8/95 1 Design of New Code And Other Technical $ 99,420 $ 315,588
Requirements
5/22/96 2 Reconfiguration of Generator Building to Fit $ 24,710 $ 340,298
Existing Site
Reconfiguration of Lay-Out And Design of New $ 23,700 $ 363,998
4/24/97 3 Discharge Header Piping
7/30/97 4 Construction Support Services $ 123,947 1 $487,945
Pending 5 Additional Construction Support Services $ 27,687 $ 515,632
1, Current Budget for Project 7-7-1.
2. Professional Services for both Project No.7.7-1 and Project No.7.14, Project 7-14 is cornplete.
Wadon\datal\wp.dtawngVOBS&CONTRACTSV-74 Won CO Agenda RepodsV-7-1 Addendum 5 to PSA Status Repoft doc 08/19/99
Revised 05114/98
PDC COMMITTEE MeetlngUzte Toad.otDir.
9/1/99 9/27/99
AGENDA REPORT tNm Number Irem NumWr
PDC99-43 13(c)
Orange County Sanitabon District
FROM: David Ludwin, Director of Engineering
Originator: Jeff Shubik, Project Manager
SUBJECT: APPROVE ADDENDUM NO. 2 TO THE PROFESSIONAL SERVICES
AGREEMENT FOR ELECTRICAL POWER SYSTEM STUDIES,
JOB NO. J-25A
GENERAL MANAGER'S RECOMMENDATION
Approve Addendum No. 2 to the Professional Services Agreement with Carollo
Engineers for Electrical Power System Studies, Job No. J-25-4, providing for additional
engineering services, for an additional amount of$91,848, increasing the total amount
not to exceed $2,077,376.
SUMMARY
In July 1998, the original Professional Services Agreement (PSA) was awarded to
Carollo Engineers, P.C. to identify and analyze problems in the existing electrical
distribution systems at Plant Nos. 1 and 2, and to recommend cost-effective solutions.
The scope of work required the Consultant to obtain electrical equipment information
from OCSD. This information is to be entered and maintained in an electrical
equipment database that the Consultant is developing for the project.
In gathering this data, it has been determined that certain electrical equipment
information is not readily available from existing sources. Additional information needs
to be collected in the field to perform the analysis of the electrical distribution system
required in this contract. The proposed Addendum No. 2 to the existing PSA will
provide for the additional data collection.
The proposed Addendum No. 2 will also modify the J-25-4 database to allow the use of
equipment lag numbers. This feature is required to make the database consistent with
the new lag numbering system being developed in Job No. J-42, Plant Reinvention and
Automation Project.
Staff recommends that Carollo Engineers, P.C. be authorized to perform the necessary
additional services in Addendum No. 2.
PROJECT/CONTRACT COST SUMMARY
The proposed Addendum No. 2 amount will not exceed $91,848. The total contract
price for professional services of this project will not exceed $2,077,376.
\NtlmWYlY.ypeVYnd•�W R.� 13W1�1
a.H..e. ermae Page 1
The attached Budget Information Table reflects the re-allocation of available
contingency funds. The total project budget of$3,171,000 remains unchanged. Costs
for design and construction projects that will result from J-25-4 recommendations have
not been budgeted because they are unknown at this time.
BUDGETIMPACT
® This item has been budgeted. (F'ss-oo Budget, section a, page 204, Project J-25-4)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
In July 1998, the original Professional Services Agreement (PSA) for professional
services was awarded to Carollo Engineers, P.C. to identify and analyze problems in
the existing electrical distribution systems at Plant Nos. 1 and 2, and to recommend
cost-effective solutions.
To analyze the systems, Carollo is to build a system model and perform calculations.
The electrical equipment information for the model is collected from existing OCSD
sources and entered in a database that the Consultant is developing for the project.
This J-254 database is intended for long-term use by OCSD staff.
In January 1999, the General Manager approved Addendum No. 1 to the existing
agreement, in the amount of$9,577, to enhance the J-254 database requirements.
The enhancement provided:
- Eliminating constraints caused by the database set-up on system stability
analysis in Job No. J-33-3, Power Monitoring and Control Systems
- Cheaper database management due to quicker navigation within the database
and quicker data entry
- Less training required for OCSD staff and Consultants
The proposed Addendum No. 2 includes two tasks:
1. Additional Field Data Collection
The results of Consultant's search for equipment information from existing sources
have helped Staff determine that certain data is not available. The missing
information has to be collected in the field to complete the analysis.
2. Equipment Database Enhancement
The enhancement will allow users to search the J-254 database using equipment
tag numbers. This is necessary to make the database suitable for the upcoming
OCSD transition to the new tag numbering system being developed in Job No. J-42,
Plant Reinvention and Automation Project.
G NtDineaMenda o,.n RamftP 6U 254U 25 Md 2AR MM do
Re . � Page 2
Staff has negotiated with the Consultant the addendum scope, cost and schedule. The
overall project schedule will be extended by two months, with completion by August
2000.
Staff recommends that Carollo Engineers, P.C. be authorized to perform the necessary
additional services in Addendum No. 2 for an amount not to exceed $91,848. The total
contract price for professional services of this project will not exceed $2,077,376.
ALTERNATIVES
No cost-effective alternatives to the additional data collection and database
enhancement are available. Delays in authorization of Addendum No. 2 will render the
project database invalid and incompatible with the new tagging system.
CEQA FINDINGS
Not applicable.
ATTACHMENTS
1. Budget Information Table
2. Professional Services Agreement Status Report
JS:jak:gc
0 M9bMNQe 0. ft R�2 b 2.Vt 6�Ad.M
Revue, eaose Page 3
BUDGET INFORMATION TABLE
Electrical Power System Studies
Job No. J-25-4
ORIGINAL,: `CURRENT PROPOSED ' PROPOSED : .FUNDS ' " - +>,'' THIS 1" PROPOSED ESTIMATED ESTIMATED
LyF,JtOJECT AUTHORIZED PROJECT: BUDGET,� • REVISED AUTHORIZED AUTHORIZATION TOTAL EXPENDITURE 'EXPENDED
+' . " BIi111,° ,BUDGET;? INCREASE BUDGET- TO DATE ' REQUEST AUTHORIZATION TO DATE , TO DATE(%)
x<
Proect Development $ 145000 $ 145,000 $ - $ 145,000 $ 145,000 $ - $ 145,000 $ 108,000 74%
Design Staff $ 615,000 $ 402,348 $ 402,348 $ 402.348 $ - $ 402.348 $ 98,000 24%
Consultant PSA $ 1,500 000 $ 1.985,528 $ 91.848 $ 2,077,376 $ 1.985,528 $ 91,848 $ 2,077,376 $ 730,000 35%
Construction Contract
Construction Other $ 5,900 $ - $ 5,900 $ 5,900 $ - $ 5,900 $ 5,900 100%
Construction Staff
ConUngency $ 632,224 $ 91,848 $ 540,378 1 $ 632,224 $ 91,848 $ 540,376 $ 0%
TOTAL $ 2,260,000 $ 3,171,000 1 $ - 1 $ 3.171,000 $ 3,171,000 1 $ $ 3,171,000 1$ 941,900 30%
D:NiplobeaAWau DWI Repons%PDCU-25 11 254ADD 02 Bu4pe1 Teble-v2.x1slD1sldc1e
Professional Services Agreement Status Report
Job No. J-25-4
Electrical Power System Studies
Total Project Budget: $3,171,000.00
Consultant: Carollo Engineers, P.C.
Start Date of Project: August 1, 1998
Date Addendum Description Cost Accumulated
Costs
07/22/98 Original PSA Electrical Power System Studies, Job No. J-25-4 $1 975,951.00 $1,975,951.00
01/25/99 Addendum, Electrical Equipment Database Enhancement $9,577.26 $1,985,528.26
pending Addendum 2 Additional Electrical Equipment Data Collection $91,848.00 $2,007,376.26
The General Manager approved Addendum No. 1 in January 1999. Reference "Additional Information" in this
Agenda Report.
JS:js
G.Wglobal%genda Draft RepoftTDCV-254PSA Status Repon-v2.doc 08/12/99
Revlssed OW14198
s
Y�
t DRAFT
MINUTES OF FINANCE, ADMINISTRATION AND
HUMAN RESOURCES COMMITTEE MEETING
Orange County Sanitation District
Wednesday, September 8, 1999, 5 p.m.
A meeting of the Finance, Administration and Human Resources Committee of the Orange
County Sanitation District was held on July 14, 1999 at 5 p.m., in the District's Administrative
Office.
(1) The roll was called and a quorum declared present, as follows:
FAHR COMMITTEE MEMBERS: OTHERS PRESENT:
Directors Present:
Thomas Woodruff, General Counsel
Thomas Saltarelli, Chair Don Hughes
Mark Leyes, Vice Chair Ryal Wheeler
Shawn Boyd Daniel Cozad, SAWPA Representative
John M. Gullixson
Shirley McCracken STAFF PRESENT:
Mark A. Murphy
Peer Swan, Board Vice Chair Blake Anderson, Assistant General Manager
John J. Collins, Past Board Chair David Ludwin, Director of Engineering
Mike Peternan, Director of Human Resources
Gary Streed, Director of Finance
Directors Absent: Michelle Tuchman, Director of Communications
Patrick Miles, Director of Information Technology
Jan Debay, Board Chair Bob Ooten, Director of Operations 8 Maintenance
James W. Silva Mike White, Controller
Steve Kozak, Financial Manager
Lisa Tomko, Human Resources Manager
Jim Herberg, Engineering Supervisor
John Swindler, IT Manager
Jean Tappan, Acting Committee Secretary
(2) APPOINTMENT OF CHAIR PRO TEN
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no public comments.
e
e
Minutes of the Finance, Administration and Human Resources Committee Meeting t
Page 2
September 8, 1999
(4) RECEIVE. FILE AND APPROVE MINUTES OF PREVIOUS MEETING
It was moved, seconded and duly carried to approve the minutes of the July 14, 1999 Finance,
Administration and Human Resources Committee meeting, as drafted. Director Gullixson
abstained.
(5) REPORT OF THE COMMITTEE CHAIR
The Committee Chair had no report.
(6) REPORT OF THE GENERAL MANAGER
The General Manager was not present.
(7) REPORT OF ASSISTANT GENERAL MANAGER
Mr. Blake Anderson provided an update on the beach closure and ongoing activities. A report
will be prepared for the Board that addresses both the cost accounting and technical issues,
along with recommendations.
Mr. Anderson also reported that OCIP member agencies are vigorously opposing the payment of
additional fees to the County of Orange litigation firm. Proceeds should be distributed in
October.
a. Presentation on SAWPA Governance and Water Bond Issue.
Daniel Cozad, SAWPA representative, described the existing SAWPA governance
structure and proposed alternatives to more clearly represent the various
agencies and stakeholders in issues impacting the Santa Ana River watershed.
He also described the projects included in the water bond that, if passed by the
State legislators, will be presented to the voters next year. The Directors
expressed concern about having agreements in place with the various recipients
to ensure that the identified funding is forwarded by SAWPA. The issue of
representation will be discussed by the Steering Committee.
(8) REPORT OF DIRECTOR OF FINANCE
Director of Finance Gary Streed reported that property tax and user fee revenues to be received
from the County exceed the amounts estimated in the budget.
He also reported on the status of the 176 requests from Yorba Linda residents for refunds or
credits. There were also 10 requests from residents in other areas of the County. A discussion
followed on reconsidering the Board decision at a future meeting.
Mr. Streed said that the last account with the County Treasurer has been closed.
(9) REPORT OF DIRECTOR OF HUMAN RESOURCES
The Director of Human Resources had no report.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 3
September 8, 1999
(10) REPORT OF DIRECTOR OF COMMUNICATIONS
The Director of Communications had no report.
(11) REPORT OF GENERAL COUNSEL
General Counsel had no report.
(12) CONSENT CALENDAR ITEMS (Items a-e)
a. FAHR99-63: Receive and file Treasurers Report for the month of
August 1999: The Treasurer's Report was handed out at the FAHR Committee
meeting in accordance with the Board-approved Investment Policy, and in
conformance to the Government Code requirement to have monthly reports
reviewed within 30 days of month end.
b. FAHR99-64: Receive and file Employment Status Report as of August 17, 1999.
C. FAHR99-65: Receive and file Quarterly Investment Management Program Report
for the Period April 1, 1999 through June 30, 1999.
d. FAHR99-66: Receive and file Certificate of Participation (COP) Monthly Report.
e. FAHR99-67: Receive and file FY 1998/99 End of Year Operational Report.
END OF CONSENT CALENDAR
Motion: Moved, seconded and duty carried to approve the recommended actions
for items specified as 12(a) through 12(e) under Consent Calendar.
(13) ACTION ITEMS (Items a-d)
a. FAHR99-57: The Delegation of Authority Resolution was pulled from the agenda
at the request of staff.
b. FAHR99.68: Update on FIS Implementation and Completion
Mike White gave a brief report on the history of the project. After discussion, the
members approved the recommendation to close out the project.
Motion: Moved, seconded and duly carried to accept the J. D. Edwards Financial
Information System and close project#5401200. Director Mark Murphy abstained
because of a possible conflict of interest.
C. FAHR99-69: Approve 401(a) Plan Maximum Contribution.
The General Manager explained that the action pertains only to the General
Manager's contract. There is no additional cost to the District.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 4
September 8, 1999
Motion: Moved, seconded and duly carried to approve 401(a) Plan Maximum
Contribution.
d. FAHR99-70: Approval of consultant contract with retired employee Gerald Jones
re Planning and Implementation of DART Re-engineering Program.
Director of Human Resources Mike Peterman explained that the DART
reinvention process is in the implementation stage and Mr. Jones' expertise and
experience is critical to the success of the program in terms of continuity and
vision. No decision has been made on filling the vacant position at this time. The
ordinance allows the FAHR Committee to waive the requirement that restricts
employing retired employees for one year. Staff was directed to include a
statement in the contract that only actual travel expenses would be reimbursed.
Director Collins asked that the language in the ordinance be revised to remove
reference to the"Joint Chairman."
Motion: Moved, seconded and duly carried to approve consultant contract with
retired employee Gerald Jones re Planning and Implementation of DART Re-
engineering Program. Director Swan opposed.
(14) INFORMATION PRESENTATIONS
a. FAHR99-61: Data Warehouse Demonstration
Information Technology Manager John Swindler demonstrated the data
warehouse and how information is collected and retrieved.
(15) OTHER BUSINESS, COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF ANY
There were no supplemental agenda items.
(16) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were none.
(17) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA FOR
ACTION AND STAFF REPORT
Director Gullixson asked that the credit and refund of user fees policy be reconsidered at a future
meeting, and that General Counsel provide the statutes that limit refunds beyond four years.
(18) CONSIDERATION OF UPCOMING MEETINGS
The next FAHR Committee meeting is scheduled for October 13, 1999 at 5 p.m.
Minutes of the Finance, Administration and Human Resources Committee Meeting
Page 5
September 8, 1999
(19) CLOSED SESSION
The Chair reported to the Committee the need for a Closed Session, as authorized by
Government Code Section 54957.6, to discuss and consider the items that are specified as
Item 19(A)(1) and (2) on the published Agenda. The Committee convened in closed session at
6:50 p.m.
Confidential Minutes of the Closed Session held by the Finance, Administration and Human
Resources Committee have been prepared in accordance with California Government Code
Section 54957.2, and are maintained by the Board Secretary in the Official Book of Confidential
Minutes of Board and Committee Closed Meetings.
At 7 p.m., the Committee reconvened in regular session.
(20) ADJOURNMENT
The Chair declared the meeting adjourned at approximately 7:02 p.m.
Submitted by:
�lon Tappan
V
ling FAHR Committee Secretary
N MO��^�^�SKA�'�mB4G FPNF MW Js
FAHIR COMMITTEE n«nn9oate ToX.ads,
09/09/99 09/22/99
AGENDA REPORT Item Number item Nym r
&
Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Steve Kozak, Financial Manager
SUBJECT: TREASURER'S REPORT FOR THE MONTH OF
AUGUST 1999
GENERAL MANAGER'S RECOMMENDATION
Receive and file Treasurer's Report for the month of August 1999.
SUMMARY
Pacific Investment Management Co. (PIMCO), serves as the District's
professional external money manager, and Mellon Trust serves as the District's
third-party custodian bank for the investment program.
The District's Investment Policy, adopted by the Board, includes reporting
requirements as listed down the left most column of the attached PIMCO Monthly
Report for the Liquid Operating Monies and the Long-Term Operating Monies
portfolios. Sufficient funds are available for the District to meet its operating
expenditure requirements for the next six months. The District's portfolios
contain no reverse repurchase agreements.
Historical cost and the current market ("mark-to-market") values are shown as
estimated by both PIMCO and Mellon Trust. The slight differences are caused
by differing assumptions regarding marketability at the estimate date.
PROJECT/CONTRACT COST SUMMARY
None.
BUDGETIMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
H 1Wp.ftTn 1W AkTr@seFapoMPME
R.mrra. ,d,TM7 Page 1
R
ADDITIONAL INFORMATION
Schedules are attached summarizing the detail for both the short-term and
long-term investment portfolios. In addition, a consolidated report of posted
investment portfolio transactions for the month of August 1999 is attached. The
attached yield analysis report is presented as a monitoring and reporting
enhancement. In this report, yield calculations based on book values and market
values are shown for individual holdings, as well as for each portfolio. Mellon
Trust, the District's custodian bank, is the source for these reports. Transactions
that were pending settlement at month end may not be reflected.
The District's investments are in compliance with the District's adopted
Investment Policy, and the California Government Code. In addition, sufficient
funds are available for the District to meet its operating expenditure requirements
for the next six months.
The table below details the book balances of the District's funds at month-end. A
graphical representation of month-end balances is shown by the attached bar
chart.
Book Balances Estimated
Funds/Accounts Aug.31, 1999 Yield(14)
State of Calif.LAIF $ 5,238,008 5.3
Union Bank Checking Account 545,719 —
Union Bank Overnight Repurchase Agreement 301,000 4.4
PIMCO—Short-term Portfolio 18,969.365 4.5
PIMCO-Long-term Portfolio 289.886,766 4.6
District 11 GO Bond Fund 921 10.810 4.9
Debt Service Reserves @ Trustees 32,195.839 6.2
Petty Cash 4,400 —
TOTAL $347.151,907
ALTERNATIVES
None.
CEOA FINDINGS
None.
ATTACHMENTS
1. Monthly Investment Reports
2. Monthly Portfolio Detail Transaction Report
GGS:SK:lc
H.M MCVM3I4 Vr aaveepolN, M.Y
R.m IWI?W Paget
ReportMonthly Treasurer's
District Fund Balances
11 0 111
i�i�i�i�i� i���i�i�i i�i�00i �i�i�i�i •���•�•��� i�i0�����
i�0000 !�JOOJ i�i�i�i�i� i•0000 'i'i•:':' ':':':':'
1 1 1 1 1 1 1 1 !i�.�i�i�� !�•�•�.i•1 1����i���i •�.�.�.i.� !i�i�.�i�1 !.�i�i�i�i
D. u LAW
OBankAccts M Petty Cash
GI Dist 11 GO Bond Fund
G:\excel.dta\finx2220\geggi\Finance\monthly treasurers report
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENTMANAGEMENTPROGRAM
PIMCO'S PERFORMANCE MONITORING&REPORTING
(for the month ending 31 August 1999)
Liquid Operating Monies(603)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
Met
,t $18,973,706
MellonO $18,969,365
.Irstorical PIMCOost: $19,055,052
• Mellon $19,055,069
15.11 MODIFIED DURATION Of Portfolio: 0.23
Of Index: 0.24
15.13 1%INTEREST RATE CHANGE Dollar Impact(gain/loss)of 1%Change: $44,160
15.IA REVERSE REPOS %of Portfolio in Reverse Repos:
(see attached schedule) 00/0
15.15 PORTFOLIO MATURITY %of Portfolio Maturing within 90 days: 50%
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality: "AA+"
15.1.7 SECURITIES BELOW"A" RATING %of Portfolio Below"A": 00/0
15.1.8 INVESTMENT POLICY COMPLIANCE "In Compliance" Yes
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%) Portfolio Index
by Period:
1 Month: 0.39 0.40
3 Months: 1.24 1.16
12 Months: 5.10 4.65
Year-to-Date: 3.23 3.04
H.t..IELNANCEU10WOZAF MVLELIQ0809 UT
MONTHLY REPORT
ORANGE COUNTY SANITATION DISTRICT
INVESTMENT MANAGEMENT PROGRAM
PIMCO'S PERFORMANCE MONITORING & REPORTING
(for the month ending 31 August 1999)
Long-Term Operating Monies (203)
15.1.1 PORTFOLIO COST AND MARKET VALUE Current Market Value Estimate:
pp��M� $290,426,401
Mellon0 $289,886,766
Historical Cost: $295,998,155
• PIMCO $296,330,392
• Mellon
15.1.2 MODIFIED DURATION Of Portfolio: 2.40
Of Index: 2.39
15.1.3 1% INTEREST RATE CHANGE Dollar Impact(gain/loss)of I%Change: $7,049,669
15.1.4 REVERSE REPOS %of Portfolio in Reverse Repos:
(see attached schedule) 0%
15.1.5 PORTFOLIO MATURITY %of Portfolio Maturing within 90 days: 22%
15.1.6 PORTFOLIO QUALITY Average Portfolio Credit Quality:
15.1.7 SECURITIES BELOW "A" RATING %of Portfolio Below "A": 0%
15.1.8 INVESTMENT POLICY COMPLIANCE "In Compliance" See Note
15.1.9 PORTFOLIO PERFORMANCE Total Rate of Return(%) Portfolio Index
by Period:
I Month: 0.15 0.20
3 Months: 0.43 0.60
12 Months: 3.21 3.30
Year-to-Date: 0.75 0.95
HA..(FINANCE@101KOZ4KISAMPLEL-7O899.KPT
NOTE: On July 30, 1999,$13 million was withdrawn to fund the District's semi-annual debt services payments. Consistent with the District's policy of preservation of principal,PIMCO liquidated
Commercial Paper and U.S.Treasury Notes for the withdrawal. Medium-term Corporate Notes were not liquidated to ensure preservation of capital in the overall portfolio. As a result,the portfolio
contained 31.9%in medium-umn Corporate Notes; 1.90/9above the diversification IimiL PIMCO has undertaken appropriate steps to restore proper sector diversification.
Q ORANGE COUNTY SANITATION DISTRICT PAGE' -I
BASE- USD
NET ASSET SECTOR SUMMARY
OCSF07511102 31-AUG-1999 FINAL
LIQUID OPER-PIMCO
%OF UNREALIZED
PORTFOLIO DISTRIBUTION COST MARKET VALUE TOTAL GAINILOSS
CASH&CASH EQUIVALENTS
UNITED STATES
COMMERCIAL PAPER-DISCOUNT 2,653,904.00 2,653,904.00 13.92% 0.00
TREASURY BILLS-LESS THN IYR 3,411,181.67 3,411,181.67 17.76% 0.00
FEDERAL HOME LOAN MORTGAGE-LESS 2,440,218.06 2,440,219.06 12.71% 0.00
FNMA ISSUES-LESS TIIN IYR 896,476.50 896,476.50 4.67% 0.00
MUTUAL FUNDS 116,792.32 116,792.32 0.61% 0.00
TOTAL UNITED STATES 9,519,572.55 9,518,572.55 49.57% 0.00
TOTAL CASH&CASH EQUIVALENTS 8,5 49.57°e 016
FIXED INCOME SECURITIES
UNITED STATES
U.S.AGENCIES 4,698,304.60 4,683,916.00 24.39% -14,389.60
BANKING&FINANCE 3,463,239.30 3,413,213.00 17.77% .50,026.30
INDUSTRIAL 963,753.00 851,853.00 4.44% -11,900.00
UTILITY-ELECTRIC 511,200.00 501,810.00 2.61% -9,390.00
TOTAL UNITED STATES 9,536,496.90 9,450,792.00 49.21% .85,704.90
TOTAL FIXED INCOME SECURITIES �7,53 , 1�U.99,450,792.00i31i% 5, 6d.95
OTHER PORTFOLIO ASSETS
PAYABLESIRECEIVABLES 234.426.98 234,426.98 1,22% 0.00
TOTAL 234,426.98 234,426.98 1.22% 0.00
TOTAL OTHER PORTFOLIO ASSETS "9 234,426.9i 0.06
NET PORTFOLIO ASSETS 19,289,4%.43 19,203,791.53 100.00% -85,704.90
07Sep-1999 15:44:44 &ecudw Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE 1
BASE: USD
NET ASSET SECTOR SUMMARY
OCSF07522202 31-AUG-1999 FINAL
LONG TERM OPER-P1MCO
%OF UNREALIZED
PORTFOLIO DISTRIBUTION COST MARKETVALUE TOTAL GAINILOSS
CASH&CASH EQUIVALENTS
RECEIVABLES 79,650.00 79,650.00 0.03% 0.00
PAYABLES -27,612,753.13 -27,612.753.13 -9.42% 0.00
TOTAL -27,533,103.13 -27,533,103.13 -9.39% 0.00
UNITED STATES
COMMERCIAL PAPER-DISCOUNT 28,283,131.89 28,283,131.89 9.65% 0.00
MUTUALFUNDS 691,400.77 691,400.77 0.24% 0.00
TOTAL UNITED STATES 29,974,532.66 28,974,532.66 9.88% 0.00
TOTAL CASH&CASH EQUIVALENTS 1,441,429.53 1,441,429.53 0.49% 0.00
FIXED INCOME SECURITIES
UNITED STATES
U.S.GOVERNMENTS 61,157,053.38 59,113,936.03 20.16% -2,043,117.35
U.S.AGENCIES 110,749,363.71 109,328,318.21 36.95% -2,421,045.50
GNMA SINGLE FAMILY POOLS 5,658,203.13 5,720,687.50 1.95% 62,484.37
GNMA MULTI FAMILY POOLS 4,047,396.48 3,992,335.92 1.36% -55,060.56
FHLMC POOLS 10,039,541.95 9,874,016.16 3.37% ,165,525.79
FHLMC MULTICLASS 6,202,994.40 6,075,858.05 2.07% -127,136.35
FNMA POOLS 712,206.25 712,206.25 0.24% 0.00
ASSET BACKED SECURITIES 113,572.62 113,536.29 0.04% -36.33
ADS:HOME EQUITY 500, 00.00 499,215.00 0.17% -785.00
MUTUAL FUNDS 1,000,000.00 987,620.00 0.34% -12,380.00
BANKING&FINANCE 68,030,156.85 67,652,641.20 23.08% -377,515.65
INDUSTRIAL 17,029,969.00 16,048,085.75 5A7% -981,883.25
UTILITY-ELECTRIC 2,151,250.00 1,931,580.00 0.66% -219,670.00
UTILITY-TELEPHONE 7,497,255.00 7,395,300.00 2.52% -101,955.00
TOTAL UNITED STATES 294,888,962.77 288,445,336.36 98.39% -6,443,626.41
TOTAL FIXED INCOME SECURITIES 2 .77 288,445,336.3 98.39%
OTHER PORTFOLIO ASSETS
07-Sep-1999 13:46:37 Executive Workbench
Q I ORANGE COUNTY SANITATION DISTRICT PAGE: 2
BASE: USD
NET ASSET SECTOR SUMMARY
OCSF07522202 31-AUG-1999 FINAL
LONG TERMOPER-PIMCO
%OF UNREALIZED
PORTFOLIO DISTRIBUTION COST MARKETVALUE TOTAL GAIN/LOSS
PAYABLES/RECEIVABLES 3,292,948.69 3,29Z948.69 1.12% 0.00
TOTAL 3,292,948.69 3,292,948.69 1.12% 0.00
TOTAL OTHER PORTFOLIO ASSETS 3,292,948.69 1.12% —.Ia
NET PORTFOLIO ASSETS 299,623}40.99 293,179,714.58 100.00% -C443,626.41
07-Sep-1999 15:46:37 Exec.f1w Workbench
o
Q ORANGE COUNTY SANITATION DISTRICT PAG`E.I . I
BASE.' USD
NET ASSET SECTOR SUMMARY
OCSF07522202 31-AUG-1999 FINAL
LONG TERM OPER-PIMCO
%OF UNREALIZED
PORTFOLIO DISTRIBUTION COST MARKET VALUE TOTAL GAINILOSS
CASH&CASH EQUIVALENTS
RECEIVABLES 79,650.00 79,650.00 0.03% 0.00
PAYABLES -27,612,753.13 -27,612,753.13 -9.42% 0.00
TOTAL .27,533,103.13 -27,533,103.13 -9.39% 0.00
UNITED STATES
COMMERCIAL PAPER-DISCOUNT 28,283,131.89 29,283,131.89 9.65% 0.00
MUTUAL FUNDS 691,400.77 691,400.77 0.24% 0.00
TOTAL UNITED STATES 28,974,532.66 28,974,532.66 9.88% 0.00
TOTAL CASH&CASH EQUIVALENTS 1,441,429.53 1,441,429.53 0.49% 0.00
FIXED INCOME SECURITIES
UNITED STATES
U.S.GOVERNMENTS 61,157,053.38 59,113,936.03 20.16% -2,043,117.35
U.S.AGENCIES 110,749,363.71 108,328,318.21 36.95% -2,421,045.50
GNMA SINGLE FAMILY POOLS 5,658,203.13 5,720,687.50 1.95% 62,484.37
GNMA MULTI FAMILY POOLS 4,047,396.48 3,992,335.92 1.36% -55,060.56
FHLMC POOLS 10,039,541.95 9,874,016.16 3.37% -165,525.79
FHLMC MULTICLASS 6,202,994.40 6,075,858.05 2.07^A -127,136.35
FNMA POOLS 712,206.25 712,206.25 0,24% 0.00
ASSETBACKED SECURITIES 113.572.62 113,536.29 0.04% -36.33
ABS:HOME EQUITY 500,000.00 499,215.00 0.17% -785.00
MUTUAL FUNDS 1,000,000.00 987,620.00 0.34% -12,380.00
BANKING&FINANCE 68,030,156.85 67,65Z641.20 23.08% -377,515.65
INDUSTRIAL 17,029,969.00 16,048,085.75 5.47% -981,883.25
UTILITY-ELECTRIC 2,151,250.00 1,931,580.00 0.66% -219,670.00
UTILITY-TELEPHONE 7,497,255.00 7,395,300.00 2.52% -101,955.00
TOTAL UNITED STATES 294,888,962.77 288,445,336.36 98.39% -6,443,626.41
TOTAL FIXED INCOME SECURITIES 294JM,962.77 298,44V36.36 98.39% 44J,
OTHER PORTFOLIO ASSETS
07Sep-1999 15:46.37 &c wiw Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 2
BASE: USD
NET ASSET SECTOR SUMMARY
OCSF07522202 31-AUG-1999 FINAL
LONG TERMOPER-P1MCO
%OF UNREALIZED
PORTFOLIO DISTRIBUTION COST MARKETVALUE TOTAL GAIN/LOSS
PAYABLES/RECEIVABLES 3,292,948.69 3,292,948.69 1.12% 0.00
TOTAL 3,292,948.69 3,292,948.69 1.12% 0.00
TOTAL OTHER PORTFOLIO ASSETS 3,292,948.69 3,292,948.69 1.121/6 0.06
NET PORTFOLIO ASSETS 299,623,340.99 293,179,714.58 100.00% -6,443,626.41
07Sep-1999 15:46.37 Eeecullee Wa kbewh
YLDANAL YIELD ANALYSIS PAGE 1
OCSF07511102 1999/08/31 RUN DATE t 09/02/99
DISTRICT. LIOUID OPERATING RUN TIME 10.57.29
.....vm..vvv=vvvv= v..vm.......mm...0.....v===.===v=mmm=save=m.....
PAR VALUE YIN AT CURRENT QUALITY RAMAT TOTAL COST/ \ TYPE
SECURITY ID SECURITY DESCRIPTION SOON YIELD RATING PRICE RAREST VALUE \ TOTAL
_________________ _____________________________ _______ _______ _______ _______ ------------ ----------
CASH 6 CASH EQUIVALENTS
116,792.32 DREYFUS TREASURY CASH MGMT .000 5.110 AAA I00.000 116,792.32 1.22
996095247 AAA 116.792.32 .12
2,500,000.00 FEDERAL DONE LN MID CORP DISC 4.846 .000 P-1 93.609 2,440,218.06 25.63
313396NT6 MAT 11/02/1999 A-1♦ 2,440,218.06 12.06
500,000.00 MONSANTO CO DISC 4.901 .000 P-1 93.933 051.400.00 9.25
61166BWO 09/23/1999 881.400.00 4.65
900,000.00 GOLONAN SACHS LP DISC 4.940 .000 P-1 97.S63 93B4O69.00 9.22
38142UY30 11/03/1999 878,069.00 4.63
3,500,000.00 U B TREASURY BILLS 5.094 .000 P-1 92.462 3,411,101.67 35.83
912395DE4 03/02/2000 OD 03/04/99 A-lf 3,411,181.67 13.98
900,000.00 FEDERAL NAIL MTG ASSN DISC 5.241 .000 P-1 99.609 896,476.50 9.41
313588LY9 MAT 09/20/1999 A-1R 896,476.50 4.23
900,000.00 GENERAL ELEC CAP DISC 5.333 .000 P-1 99.382 094,435.00 9.39
36959SX65 10/04/1999 894,435.00 4.32
________ _______ ----------------- ---------
TOTAL CASH 6 CASH EQUIVALENTS 4.854 .116 9,518.572.55 100.00
9,510,572.55 50.19
FIXED INCOME SECURITIES
1,000,000.00 FEDERAL DOW LN STG CORP OEM .000 4.703 AAA 99.953 999.200.00 10.59
3134A3RT5 MID AT 05/19/2000 DO 05/10/99 AAA 999,530.00 S.27
3.300,000.00 FEDERAL DONE LN BE CONS SUN 4.060 4.855 ARA 99.528 3,699,104.60 38.98
3133M7EM2 4.935\ 01/28/2000 DD O1/28/99 AAA 3,684,366.00 11.42
500,000.00 DUKE ENERGY CORP 1ST 6 REF HIG 5.001 3.931 AA3 100.362 511,200.00 5.30
264399DB9 8.000% 11/01/1999 DO 11/01/94 AA- 501,B10.00 2.65
500,000.00 CHRYSLER PINL CO LLC 5.119 13.134 Al 100.861 529,010.00 5.33
131205AT4 13.250\ IO/IS/1999 A+ 504,405.00 2.61
850,000.00 PHILLIP "MIS CO INC NTS 5.259 7.1I0 A2 100.219 863.753.00 9.01
718154BX4 3.125% 12/01/1199 DO 12/01/12 A 851t851.00 4.49
YLDANAL FIELD ANALYSIS PAGE t 2
OCSF03511102 1999/OB/31 RUN DATE t 09/02/19
DISTRICTt LIQUID OPERATING RUN TIME t 10.57.29
PAR VALUE YIN AT CURRENT QUALITY RAREST TOTAL COST/ 1 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD RATING PRICE RAREST VALUE 8 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ __-_______
100,000.00 GENERAL NTRS ACCEP CORP NTN 5.305 6.266 A2 100.060 901,657.00 9.52
3)062N)G2 6.2508 01/11/2000 DO 01/11/94 A 900,612.00 6.75
300,000.00 BEAR STEARN COS INC RATS 5.363 7.621 A2 100.050 303.930.00 3.13
033902AP3 3.625% 09/15/1999 DO 09/21/14 A 300,150.00 1.59
500.000.00 TRANSAMERICA FIN NIP ISB00IIO 5.653 8.396 A3 100.760 515,125.00 5.33
893SOMEPI 8.650% 01/12/2000 DO 01/12/15 A 503.B60.00 2.66
900,000.00 FINOVA CAP CORP NTN TR 00039 5.932 6.185 BRAI 100.078 901.263.30 1.53
31808CBQ6 6.1901 10/20/1991 DD 10/20/97 A- 900,702.00 6.35
300,000.00 LEBMAN RACE RIDGE NIN IR 00327 6.666 8.056 A3 101.168 306.350.00 3.21
52517PPOS 8.250% 05/15/2000 DO 10/16/90 A 303,504.00 1.60
________ _______ _________________ _________
TOTAL FIXED INCOME SECURITIES 6.266 5.931 9,536,196.90 100.00
9,450,792.00 41.83
-------- ------- ----------------- ---------
TOTAL 4.476 3.050 19.055.069.65 100.00
18,969,366.55 100.00
YLDANAL YIELD ANALYSIS PAGE t 3
MSP09522202 1999/08/31 RUN DATE 09/02/59
DISTRICTS LONG-TERM OPERATING RUN TIME t 10.57.29
PAR VALUE YTN AT CURRENT QUALITY MARKET TOTAL COST/ 4 TYPE
SECURITY ID SECURITY DESCRIPTION BOOR YIELD RATING PRICE MARKET "LOB 4 TOTAL
CASH 6 CASH EQUIVALENTS
691,400.23 DREYFUS TREASURY CASH MOST .000 5.169 AAA 100.000 691,400.00 2.38
996095247 AAA 691,400.27 .22
2,200,000.00 FORD MTR CR CO DISC 5.296 .000 P-1 99.698 2,193,352.33 0.56
34539UW99 09/05/1999 2,193,352.33 .69
12,200,000.00 SAM LEE CORP DISC 5.231 .000 P-1 99.595 12,150,562.09 41.93
8D311BWM9 09/21/1999 12,150,562.89 3.83
14,000,000.00 IBM DISC 5.233 .000 P-1 99.566 13,939,216.67 48.10
44922BMH7 09/17/2999 13,939,216.67 4.39
________ _______ _________________ ---------
TOTAL CASH 6 CASH EQUIVALENTS 4.923 .300 28,974,532.66 100.00
20,974,532.61 9.13
PIKED INCOME SECURITIES
2,000,000.00 BANKERS TR NY CORD GLOBAL LIT .000 5.299 Al 99.926 1,992,000.00 .69
066365DM4 FLTG AT 05/11/2001 DO 05/11/18 A- 1,998,560.00 .63
.00 CHASE NAMHATTAN GRAN 95-B CL A .000 .000 AAA .000 .00 .00
161614AE2 5.900% 11/15/2001 DO ll/15/95 AAA .00 .00
3,500,0D0.00 CHRYSLER PIN MTN .000 5.000 Al 99.812 3,498,635.00 1.21
17120QEBO FLTG AT 08/08/2002 DO 04/00/98 A4 3,493,420.00 1.10
2,000,000.00 FORD MR CA CO TERN ENHANCED .000 5.606 Al 95.812 1,998,613.60 .69
3453975CO FLTG AT 08/27/2006 DO 08/27/98 A 1,996,240.00 .63
3,000,000.00 GENERAL MIRE ACCEP MTN .000 5.585 A2 100.187 3,010,930.00 1.04
37042NVR9 FLTG AT 12/17/2001 DO 12/15/98 A 3,005,610.00 .95
3,950,000.00 GENERAL NTRB ACCEP CORP HIS .000 5.501 A2 100.103 3,910.060.50 1.33
37042SQVS PLIG AT 08/18/2003 DD 00/17/98 A 3,954,068.50 2.25
2,000,000.00 HELLER FINANCIAL INC HIS .000 5.454 A3 100.430 2,000,000.00 .69
423320BKO FLTG AT 06/25/2001 DO D6/35/99 A- 2,006,600.00 .63
3,000,000.00 HELLER FINL MTN ITR 00246 .000 5.220 A3 100.711 3,000,000.00 1.04
42333HLF1 FLTG AT 04/28/2003 DO 04/27/99 A- 3,021,330.00 .95
YLDANAL YIELD ANALYSIS PAGE 1 4
MBF07522202 1999/08/31 RUN DATE 1 09/02/99
DISTRICT, LONG-TERN OPERATING RUN TIME 1 10.57.29
PAR VALUE YIN AT CURRENT QUALITY HARELY TOTAL COST/ % TYPE
SECURITY ID SECURITY DESCRIPTION BOOS YIELD RATING PRICE M XEY VALUE 0 TOTAL
4,000,000.00 HOUSEHOLD FIN CO HTN .00D 5.434 A2 100.275 4,000,000.00 1.39
44181KZAS FLTG RT 06/24/2003 DO D6/24/90 A 4,011,000.00 1.26
1,000,000.00 HOUSEHOLD FIN HTN SR 900530 .000 5.343 A2 100.006 999,IBB.90 .34
44181KXT4 FLTG RT 00/01/2001 DO 09/04/98 A 1,000,060.00 .32
.00 STUDENT LN NXTG ASSN 1992-1 Al .000 .000 AAA .000 .00 .00
30442GAX2 VAR AT 10/25/2005 DO 03/20/97 AAA .00 .00
7,264,250.00 US TREASURY INFLATION INDEX HT 3.658 3.659 AAA 99.094 7,241,093.I7 2.49
9128273AB 3.6251 07/15/28D3 OD 07/15/97 AAA 7,198,435.90 2.23
10,490,100.00 US TREASURY INFLATION INDEX NT 3.324 3.529 AAA 95.625 10,211,075.00 3.40
9128232H3 3.375% 01/15/2007 DO 01/15/97 AAA 10,031,159.13 3.16
0,500,000.00 V S TREASURY NOTES 4.139 6.191 AAA 100.953 9,034,223.67 2.93
9128232G6 06.250% 01/31/2002 DO 01/31/97 AAA 8,581,005.00 2.30
19,000,000.00 FEDERAL NATL MTG ASSN KM 4.943 6.622 AAA 100.715 20,DI2,51D.OD 6.63
31364CXY7 6.630% 03/27/2002 DO 03/27/97 AAA 19,136,610.00 6.03
7,000,000.00 NORGAN STANLEY HTN HER 00299 5.170 5.164 RAI 99.334 6,996,129.00 2.42
61745ENLI PLTG AT 04/15/2002 DO 04/15/99 Al 6,981,380.00 2.20
5,000,000.00 U 8 TREASURY BONDS 5.234 9.474 AAA 117.422 6,233,593.75 2.03
912810DE5 11.125% 08/25/2003 DO 07/05/83 AAA 5,831,10O.00 1.65
2,100,000.00 U R TREASURY NOTES 5.294 6.303 AAA 101.141 2,167,321.15 .33
912827954 06.375% 09/30/2001 DO 09/30/96 AAA 2,123,961.00 .63
900,000.00 U S TREASURY NOTES 5.366 3.243 AAA 103.484 967,825.47 .32
912827D25 07.500% 11/15/2001 OD 11/15/91 AAA 931,356.00 .29
5,500,000.00 U S TREASURY ROTES 5.402 6.190 AAA 100.56, 5,637,692.23 1.92
9128273GS 06.2501 08/31/2002 DO 09/02/93 AAA 5,553,295.00 1.35
5,200,000.DO U S TREASURY BONDS 5.610 9.814 AAA 121.000 6,690,250.00 2.18
912010WO 11.875% 11/15/2003 DO 10/05/03 AAA 6,292,000.00 1.98
1,500,000.00 ASSOCIATES CORP N A SR NTS 5.650 6.554 AA 99.192 1,543,215.00 .51
046003HY0 6.500E 07/15/2002 DO 07/11/97 AA- 1,497,580.00 .47
1,000,000.00 HELLER FINANCIAL INC HIS 5.360 5.830 A3 97.822 999,730.00 .33
42333HKJO 5.750% 01/25/2001 DO 09/25/98 A- 978,220.00 .31
YLDAMA , YIELD ANALYSIS PAGE i 5
OCSM7522202 1991/08/31 RUN DATE : 09/02/99
DISTRICT: LONG-TERM OPERATING ROM TIME i 10.57.29
PAR VALUE YTM AT CURRENT QUALITY MARKET TOTAL COST/ 4 TYPE
SECURITY ID SECURITY DESCRIPTION BOON YIELD RATING PRICE MARKET VALUE 4 TOTAL
_________________ ---------------------------- _______ _______ ------- -------- ------------ __________
3,700,000.00 V 5 TREASURY MOTES 5.783 6.396 AAA 101.625 3,810,555.70 1.30
9128232N1 06.500% 05/31/2002 DO O6/02/97 AAA 3,760,125.00 1.18
2,005,000.00 HEARS ROEBUCK ACCEP CORP MEN 5.004 6.139 A2 99.515 2,060,739.00 .66
B124000N6 6.540% 02/20/2003 DD 02/20/97 A- 1,975,225.75 .62
5,000,000.00 U 5 TREASURY NOTES 5.811 6.181 AAA 101.016 5,006,402.25 1.35
91282721,5 06.250% 02/28/2002 DD 02/28/97 AAA 5e050'BU0.00 1.59
3,000,000.00 SEARS ROEBUCK ACCEP CORP RATS 5.049 6.681 A2 99.234 3,073.370.00 1.03
81240QJAI 6.630% 07/09/2002 DO 07/09/97 A- 2,972r020.00 .94
14,750,000.00 FEDERAL MAIL BIG ASSN MEN 5.882 6.290 AAA 90.281 14,560,462.50 4.64
31364GLD9 5.710% 12/15/2008 DD 12/15/99 AAA 13,390,197.50 4.22
6,000,000.00 HATIONSBANK CHARLOTTE N C HIM 5.882 5.860 "1 99.828 51996,400.00 2.09
63858JDE6 5.850% 04/07/2000 DD 04/07/98 AA- 5,989,680.00 1.89
754,939.30 FMLHC MULTICL MYG P/C 1524 E 5.112 5.919 99.718 753,777.80 .26
3133T02D5 5.900% 06/15/2017 752,710.65 .24
15,000,000.00 FEDERAL NAIL MTO ASKS MTN 5.901 5.860 AAA 99.312 14,955,300.00 5.26
31364G2V0 5.820% 07/19/2001 DD 02/19/9% AAA 14,096,800.00 4.69
2,500,000.00 MERRILL LYNCH MOTES 5.995 6.410 AA 99.455 2,526,725.00 .86
59018SKP4 6.3358 10/01/2001 DO 10/03/57 AA- 2,486,375.00 .28
7,500,000.00 BELLSOUTH TELECOMMUNICATIONS 6.010 6.095 AAA 98.604 7,497,255.00 2.56
039663AY5 6.000% 06/15/2002 OD 06/15/98 AAA 7,395,300.00 2.33
1,250,000.00 GENERAL MTRS ACCEP CORP RATS 6.032 3.024 A2 100.716 1,283,862.50 .43
3704250PO 7.125% 05/01/2002 UP 05/01/99, A 1,250,950.00 .40
1,000,000.00 GENERAL MYER ACCEP CORP RPM 6.046 6.638 A2 100.328 1,018,520.00 .34
37042MKI 6.300% 04/30/2001 UP 04/25/91 A 1,003,280.00 .32
15,000,000.00 FEDERAL ROM LN MTG CORP DEBS 6.062 6.028 AAA 99.530 14,982,750.00 S.17
3134A3EM1 6.000% 07/20/2001 DD 07/20/99 AAA 14o929,500.00 4.20
2,500,000.00 LEHMAN BROS MTM 4TR 00343 6.110 6.119 A3 99.859 2,500,000.00 .86
52517PQG9 PLTG AT O7/15/2002 DD 07/12/99 A 2,496,475.00 .39
2,000,000.00 BAMKBOSION CORP SR EYE 6.133 6.203 A2 98.692 1,999,600.00 .68
06605TAL6 6.125% 03/15/2002 DO 03/12/99 A- 1,973,440.00 .62
YLDAML YIELD ANALYSIS PAGE 6
OC6Po3522202 1999/08/31 RUN DATE , 09/02/99
DISTRICT, LUNG-TERM OPERATING RUN TIME x 10.57.29
PAR VALUE YTN AT CURRENT WALITY MARKET TOTAL COST/ 8 TYPE
SECURITY ID SECURITY DESCRIPTION BOOR YIELD RATING PRICE RAREST VALUE 9 TOTAL
1,000,000.00 FIRST USA BR NA RTN ISR 00002 6.164 6.186 AA2 99.009 999,100.00 .34
33744CAB1 6.125% 06/25/2001 DD 06/23/99 AA- 99D,030.00 .31
113,572.63 FIFTH THIRD BR AUTO TR 96A CIA 6.200 6.202 AAA 99.968 113,572.62 .03
31633EAA4 6.200% 09/01/2001 DD 03/15/96 113,536.29 .04
1,000,000.00 POPULAR INC MN ITR 00004 6.201 6.239 A3 98.762 1,000,000.00 .34
73317PADI 6.200% 04/30/2001 DO 04/21/99 BBB. 987,620.00 .31
500,000.00 OMEN THEN CORP 99-D CL A-1 6.210 6.30D AAA 99.843 500,000.00 .13
3935052Y3 6.290% 10/15/2013 OD 08/26/99 AAA 499,215.00 .16
4,500,000.00 FEDERAL NAIL RIG ASSN WN 6.291 6.249 AAA 99.703 4,488,705.00 1.55
31364CRV5 6.230% 03/01/2002 DO 03/03/97 AM 4,406,635.00 1.41
3,444,561.18 PHLMC NULTIC4A63 CTF E3 A 6.316 6.020 AAA 90.663 3,448,328.60 1.13
3133WE95 6.3241 00/15/2032 AAA 3,398,507.40 1.03
2,000,000.00 SEAR STEARNS COS INC 6.330 6.042 A2 98.659 2,031,960.00 .68
073902ANI 6.350% 04/15/2003 A 1,973,190.00 .62
5,000,000.00 LBHHAN ERGS MUCH MTN 600196 6.364 6.169 A3 99.31E 5,039,450.00 1.32
52517PJD4 6.650% 11/09/2000 DO 11/08/96 A 4,905,900.00 1.57
1,305,000.00 BEAR STEARNS COS INC SR NTS 6.425 6.756 A2 99.914 1,317,619.35 .45
093902AW8 6.350% 05/01/2001 DD 04/26/96 A 1,303,833.70 .41
2,000,000.00 PHLNC MULTICLASS CTF T11 A6 6.496 6.355 AAA 96.232 2,000,089.00 .16
3133TDPV2 6.500% 09/25/2018 AAA 1,924,640.00 .61
6,250,000.00 COMMIT TO FOR OHM SP MTG 6.532 6.555 AM 91.531 5,658,203.13 1.90
OIN060692 6.00% 9/15/2028 AM 5,720,607.50 1.80
2,327,0B1.40 FHLMC MULTICLASS CTF DER 1620E 6.545 3.091 AM 84.615 2,172,641.46 .68
3133TI7A4 6.000% 11/15/2023 DO 11/01/93 AM 1,969,645.71 .62
730,000.00 CONNIT TO FUR FNMA 11TH 6.555 6.534 AAA 93.563 712,206.25 .24
IIFOI1693 VAR RT 09/01/2029 AM 712,206.25 .22
22,500,000.00 CONNIT TO FOR GNMA SF HTG 6.563 6.B90 AM 94.344 21,242,343.75 3.35
01N062698 6.500% 01/15/2029 AAA 21,227,400.00 6.69
0,000,000.00 FEDERAL NAIL MTG ASSN NTN 6.533 6.506 AM 100.594 8,012,576.00 2.38
31364CBD9 6,625% 04/10/2001 DD 04/18/96 AAA 0,047,520.00 2.54
YLDANAL YIELD ANALYSIS PAGE I
OC6POIS22202 1999/O8/31 RUN DATE 01/02/11
DISTRICTS LONG-TERM OPERATING RUN TINE t 10.57.29
PAR VALUE YTM AT CURRENT QUALITY BARNEY TOTAL COST/ B TYPE
SECURITY ID SECURITY DESCRIPTION BOOR YIELD RATING PRICE MARKET VALUE B TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ ----------
9.000.000-.00 PNILIP NORRIS COS RT 6.593 9.128 A2 101.339 9,903,780.00 3.16
318154BB2 1.250% 02/15/2000 A 9,120,420.00 2.83
9,805,067.46 PNLMC GROUP 465-0436 6.628 7.009 AAA 99.888 10,039,541.95 3.42
312001,055 7.000% 02/01/2003 DD 02/01/9B AAA 9,874,016.16 3.11
2,261,073.85 GNBA II POOL 4080088H 6.705 6.842 AM 100.484 2.310.534.84 .78
3622WC20 6.835% 06/20/2027 DO 06/01/97 ARA 2r232.017.45 .22
10,500,000.00 FEDERAL IBM LN MYG CORD DEAN 6.711 6.453 AAA 93.562 10,323,075.00 3.55
3134A3TC0 6.3001 06/01/2004 DD 06/01/99 AAA 10,244,010.00 3.23
2,000,000.00 BARSN 6 BCLENNAN COS INC SR NT 6.717 6.703 A2 98.771 1,192,200.00 .68
571749MO 6.6251 06/15/2004 DO O6/14/99 AA- 1,975,420.00 .62
3,000,000.00 FORD MTR CA CO GLOBAL LANDMARK 6.739 6.909 Al 98.398 2,995,080.00 1.02
345393SJ3 6.200% 07/16/2004 DO 07/16/91 A 2,951,940.00 .13
3,000,000.00 CIT GROUP INC BTN SR 00024 6.I90 6.124 AA 96.506 2,900,000.00 1.00
12560PA14 5.9101 11/10/2003 DO 11/09/18 A4 21895,180.00 .11
2,500,000.00 COUNTRYWIDE RUNE LN6 INC NT 6.866 6.167 A3 99.323 2,499,400.00 .05
22237UASS 6.850% 06/15/2004 DD 06/24/99 A 2.458.035.00 .33
1,I08.563.55 GNMA II POOL #0080023 6.B69 6.952 AM 100.680 1.136,961.64 .59
36225CMI 3.000% 12/20/2026 DD 12/01/96 RAN LI20.3I8.4I .54
1,000,000.00 HOUSEHOLD PIN CORP NT 6.074 6.315 A2 95.015 964,650.00 .32
441912GFS 6.000% 05/01/2004 DO 04/30/99 A 950.150.00 .30
2,500,000.00 U S TREASURY BONDS 6.906 8.903 AAA 148.828 4.029.030.31 1.2E
912810W4 13.2508 05/15/2014 DD 05/15/04 AAA 3.320.300.00 1.17
2,000,000.00 LONG ISLAND LTG CO DEB 3.512 9.490 HAA3 96.599 2,151,250.00 .66
542671CT3 9.200% 03/15/2023 DO 03/28/13 A- 1.93Ir5BO.00 .61
TOTAL PIKED INCURS SECURITIES 4.614 6.130 294,608,962.33 100.00
288.445,316.36 90.83
Yllmu," YIELD ANALYSIS PAGE 0
OCSF07522202 1999/OB/31 RUN DATE 09/02/99
DISTRICT. ICNO-TERN OPERATING RUN TINE : 10.57.29
PAR VALUE YTN AT CURRENT QUALITY PRESET TOTAL COST/ 0 TYPE
SECURITY ID SECURITY DESCRIPTION BOOK YIELD RATING PRICE NARNET VALUE 0 TOTAL
----------------- ----------------------------- ------- ------- ------- -------- ------------ __--__----
-------- ------- ----------------- ---------
TOTAL 6.615 6.100 323,063,495.43 100.00
319:610,069.02 100.00
Q ORANGE COUNTY SANITATION DISTRICT PAGE: • 1
PORTFOLIO DETAIL
OCS0000/0000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNTI
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPLDATE GAIN/LOSS
RECEIPTS AND DISBURSEMENT TRANSACTIONS
OTHER ADMINISTRATIVE EXPENSES
LONG TERM OPER-PIMCO
0.00 FED WIRE FEES FOR 7-99 06-Aug-1999 -9.35
NA9123459 0.00
CW 06-Aug-1999 0.00
LIQUID OPER-PIMCO
0.00 FED WIRE FEES FOR 7-99 06-Aug-1999 -1.70
NA9123459 0.00
CW 06-Aug-1999 0.00
LONG TERM OPER-PIMCO
0.00 FED WIRE FEES 19-Aug-1999 -0.85
9936IM668 LEHMAN BROTHERS REPO 0.00
CW 19-Aug-1999 0.00
PURCHASES
CASH&CASH EQUIVALENTS
LIQUID OPER-PIMCO
157,969.32 DREYFUS TREASURY CASH MGMT 02-Aug-1999 -157,968.32
996085247 02-Aug-1999 157,968.32
B 0.00
LIQUID OPER-PIMCO
157,968.32 DREYFUS TREASURY CASH MGMT 02-Aug-1999 -157,%8.32
996085247 02-Aug-1999 0.00
FC 02-Aug-1999 0.00
07-Sep-1999 16.01:06 Erecutiw Wo kbewh
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 2
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
8,760,997.39 DREYFUS TREASURY CASH MGMT 02-Aug-1999 -8,760,997.39
996085247 02-Aug-1999 8,760,997.39
B 0.00
LONG TERM OPER-PIMCO
9,760,997.39 DREYFUS TREASURY CASH MGMT 02-Aug-1999 -8,760,997.39
996085247 02-Aug-1999 0.00
FC 02-Aug-1999 &00
LONG TERM OPER-PIMCO
9,400,000.00 EMERSON ELEC CO DISC 02-Aug-1999 -9,391,979.67
29101DV96 08/09/1999 03-Aug-1999 9,391,978.67
B MORGAN STANLEY&CO INC,NY 0.00
LONG TERM OPER-PIMCO
9,400,000-00 EMERSON ELEC CO DISC 02-Aug-1999 -9,391,978.67
29IOlDV96 08/09/1999 03-Aug-1999 0.00
FC MORGAN STANLEY&CO INC,NY 03-Aug-1999 0.00
LONG TERM OPER-PIMCO
13,100,000.00 GENERAL ELEC CAP DISC 09-Aug-1999 -13.072,162.50
36959JVQ3 08/23/1999 09-Aug-1999 13,072,162.50
B GENERAL ELECTRIC 0.00
LONG TERM OPER-PIMCO
13,100,000.00 GENERAL ELEC CAP DISC 09-Aug-1999 -13,072,162.50
36959JVQ3 09/23/1999 09-Aug-1999 0.00
FC GENERAL ELECTRIC 09-Aug-1999 OAO
LONG TERM OPER-PIMCO
26,066.67 DREYFUS TREASURY CASH MGMT I I-Aug-1999 -26,066.67
996085247 I]-Aug-1999 26,066.67
B 0.00
07-&p-/999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PACE: •3
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
26,066.67 DREYFUS TREASURY CASH MGMT I I-Aug-1999 -26,066.67
996085247 11-Aug-1999 0.00
FC 11-Aug-1999 0.00
LIQUID OPER-PIMCO
12,225.00 DREYFUS TREASURY CASH MGMT 16-Aug-1999 -12,225.00
996095247 16-Aug-1999 12,225.00
B 0.00
LIQUID OPER-PIMCO
12,225.00 DREYFUS TREASURY CASH MGMT 16-Aug-1999 -12,225.00
996085247 16-AugA999 0.00
FC 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
2,234,785.56 DREYFUS TREASURY CASH MGMT 16-Aug-1999 -2,234,785.56
996085247 16-Aug-1999 2,234,785.56
B 0.00
LONG TERM OPER-PIMCO
2,234,795.56 DREYFUS TREASURY CASH MGMT 16-Aug-1999 .2,234,785.56
996085247 16-Aug-1999 0.00
FC 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
3,903.70 BSDT-LATE MONEY DEP ACCT 16-Aug.1999 .3,903.70
996087094 VAR RT DD 06/26/1997 16-Aug-1999 3,903.70
B 0.00
LONG TERM OPER-PIMCO
3,903.70 DREYFUS TREASURY CASH MGMT 17-Aug-1999 .3,903.70
996085247 17-Aug-1999 3,903.70
B 0.00
07-Sep-1999 16.'01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE.. 4
PORTFOLIO DETAIL
Ocsc000l0000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAINfLOSS
LONG TERM OPER-PIMCO
3,903.70 DREYFUS TREASURY CASH MGMT 17-Aug-1999 -3,903.70
9%085247 17-Aug-1999 0.00
FC 17-Aug-1999 0.00
LIQUID OPER-PIMCO
4.292.64 DREYFUS TREASURY CASH MGMT I8-Aug-1999 A,292.64
996085247 18-Aug-1999 4,292.64
B 0.00
LIQUID OPER-PIMCO
4,292.64 DREYFUS TREASURY CASH MGMT I8-Aug-1999 A,292.64
996093247 18-Aug-1999 0.00
FC 18-Aug-1999 0.00
LONG TERM OPER-PIMCO
14,492.23 BSDT-LATE MONEY DEP ACCT 18-Aug-1999 -14,482.23
996087094 VAR RT DO 0626/1997 18-Aug-1999 14,482.23
B 0.00
LONG TERM OPER-PIMCO
14,000,000.00 IBM DISC I9-Aug-1999 -13,939,216.67
44922BWH7 09/17/1999 IS-Aug-1999 13,939,216.67
B IBM CREDIT CORP 0.00
LONG TERM OPER-PIMCO
14,000,000.00 IBM DISC IS-Aug-1999 -13,939,216.67
44922BWH7 09/17/1999 18-AugA999 0.00
FC IBM CREDIT CORP I9-Aug-1999 0.00
LONG TERM OPER-PIMCO
2,100,000.00 LEHMAN BROTHERS REPO I8-Aug-1999 -2,100,000.00
99361 M668 04.8600/e08/19/1999 DO 08/18/ 18-Aug-1999 2,100,000.00
B LEHMAN BROS INC.NJ 0.00
07-Sep-1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: •5
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
2,100,000.00 LEHMAN BROTHERS REPO 18-Aug-1999 -2,100,000.00
99361M668 04.860Ye08/19/1999 DO 08/18/ 18-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 18-Aug-1999 0.00
LONG TERM OPER-PIMCO
2,200,000.00 FORD MTR CR CO DISC I9-Aug-1999 -2,193,352.33
34539UW99 09/09/1999 19-Aug-1999 2,193,352.33
B FORD MOTOR CREDIT 0.00
LONG TERM OPER-PIMCO
2,200,000.00 FORD MTR CR CO DISC 19-Aug-1999 -2,193,352.33
34539UW99 09/09/1999 19-Aug-1999 0.00
FC FORD MOTOR CREDIT 19-Aug-1999 0.00
LONG TERM OPER-PIMCO
211,292.45 DREYFUS TREASURY CASH MGMT 20-Aug-1999 -211,282.45
996085247 20-Aug-1999 211,292.45
B 0.00
LONG TERM OPER-PIMCO
211,282.45 DREYFUS TREASURY CASH MGMT 20-Aug-1999 -211.282.45
996095247 20-Aug-1999 0.00
FC 20-Aug-1999 0.00
LONG TERM OPER-PIMCO
12,200,000.00 SARA LEE CORP DISC 23-Aug-1999 -12,150,562.89
80311BWM9 09/21/1999 24-Aug-1999 12,150,562.99
B FIRST CHICAGO CAP MKTS INC, 0.00
LONGTERM OPER-PIMCO
12,200,000.00 SARA LEE CORP DISC 23-Aug-1999 -12,150.562.99
80311BWM9 09/21/1999 24-Aug-1999 0.00
FC FIRST CHICAGO CAP MKTS INC, 24-Aug-1999 0.00
074ep-1999 16:01:06 Eiecudw Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 6
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LIQUID OPER-PIMCO
3,523.50 DREYFUS TREASURY CASH MGMT 24-Aug4999 -3,523.50
996085247 24-Aug-1999 3,523.50
B 0.00
LIQUID OPER-PIMCO
3,523.50 DREYFUS TREASURY CASH MGMT 24-Aug-1999 -3,523.50
996085247 24-Aug-1999 0.00
PC 24-Aug4999 0.00
LONG TERM OPER-PIMCO
292,069.05 DREYFUS TREASURY CASH MGMT 24-Aug-1999 -292,069.05
996085247 24-Aug-1999 292,069.05
B 0.00
LONG TERM OPER-PIMCO
292,069.05 DREYFUS TREASURY CASH MGMT 24-Aug-1999 -292,069.05
996085247 24-Aug-1999 0.00
PC 24-Aug-1999 0.00
LIQUID OPER-PIMCO
900,000.00 FEDERAL NATL MTG ASSN DISC 24-Aug-1999 -896,476.50
313588LY9 MAT 09/20/1999 24-Aug-1999 896,476.50
B MERRILL LYNCH PIERCE FENNER 0.00
LIQUID OPER-PIMCO
900,000.00 FEDERAL NATL MTG ASSN DISC 24-Aug-1999 -896,476.50
313588LY9 MAT 09/20/1999 24-Aug-1999 0.00
FC MERRILL LYNCH PIERCE FENNER 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
4,673.95 DREYFUS TREASURY CASH MGMT 25-Aug-1999 4,673.95
996085247 25-Aug-1999 4,673.95
B 0.00
07Sep-1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE' ` 7
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE! AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LIQUID OPER-PIMCO
5,565.00 DREYFUS TREASURY CASH MGMT 25-Aug-1999 -5,565.00
996085247 25-Aug-1999 5,565.00
B 0.00
LONG TERM OPER-PIMCO
4,673.95 DREYFUS TREASURY CASH MGMT 25-Aug-1999 4,673.95
996085247 25-Aug-1999 0.00
PC 25-Au0999 0.00
LIQUID OPER-PIMCO
5,565.00 DREYFUS TREASURY CASH MGMT 25-Aug-1999 -5,565.00
996095247 25-Aug-1999 0.00
FC 25-Aug-1999 0.00
LIQUID OPER-PIMCO
900,000.00 GENERAL ELEC CAP DISC 25-Aug-1999 -994,435.00
36959JX65 10/06/1999 25-Aug-1999 894.435.00
B GENERAL ELECTRIC 0.00
LIQUID OPER-PIMCO
900,000.00 GENERAL ELEC CAP DISC 25-Aug-1999 -894,435.00
36959JX65 10/06/1999 25-Aug-1999 0.00
PC GENERAL ELECTRIC 25-Aug-1999 0.00
LONG TERM OPER-PIMCO
26,306.27 DREYFUS TREASURY CASH MGMT 27-Aug-1999 -26,306.27
996095247 27-Aug-1999 26,306.27
B 0.00
LONG TERM OPER-PIMCO
26,306.27 DREYFUS TREASURY CASH MGMT 27-Aug-1999 -26,306.27
996085247 27-Aug-1999 0.00
PC 27-Aug-1999 0.00
07Sep1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 8
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LIQUID OPER-PIMCO
2,255.83 DREYFUS TREASURY CASH MGMT 31-Aug-1999 -2,255.83
996085247 31-Aug-1999 2,255.93
B 0.00
LIQUID OPER-PIMCO
2,255.83 DREYFUS TREASURY CASH MGMT 31-Aug-1999 -2,255.83
996085247 31-Aug4999 0.00
FC 31-Aug-1999 0.00
LONG TERM OPER-PIMCO
328,125.00 DREYFUS TREASURY CASH MGMT 31-Aug4999 -328,125.00
996085247 31-Aug-1999 328,125.00
B 0.00
LONG TERM OPER-PIMCO
329,125.00 DREYFUS TREASURY CASH MGMT 31-Aug-1999 -328,125.00
996095247 31-Aug-1999 0.00
FC 31-Aug4999 0.00
LIQUID OPER-PIMCO
3,500,000.00 U S TREASURY BILLS 31-Aug-1999 -3,411,181.67
912795DK4 03/02/2000 DO 03/04/99 31-Aug-1999 3,411,181.67
B PRUDENTIAL SECURITIES INC 0.00
LIQUID OPER-PIMCO
3,500,000.00 U S TREASURY BILLS 31-Aug-1999 -3,411,181.67
912795DK4 ONO2/2000 DD 03/04/99 31-Aug-1999 0.00
FC PRUDENTIAL SECURITIES INC 31-Aug-1999 0.00
FIXED INCOME SECURITIES
LONG TERM OPER-PIMCO
-730,000.00 COMMIT TO PUR FNMA 11TH DIST 13.3u1-1999 718,82L88
IIFO11665 VAR RT 08/012029 25-Aug-1999 -718,821.88
BC GOLDMAN SACHS&CO,NY 0.00
07-Seµ1999 16.01:06 ErecutNe Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: •9
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAINILOSS
LONG TERM OPER-PIMCO
730,000.00 COMMIT TO PUR FNMA 1 ITH DIST 13-Jul-1999 -718,821.98
I IF011685 VAR RT 08/01/2029 25-Aug-1999 718,821.98
B GOLDMAN SACHS&CO,NY 0.00
LONG TERM OPER-PIMCO
730,000.00 COMMIT TO PUR FNMA I ITH DIST 13-Jul-1999 -718,821.98
11 F011695 VAR RT 08/012029 25-Aug-1999 0.00
FC GOLDMAN SACHS&CO,NY 25-Aug-1999 0.00
LONG TERM OPER-PIMCO
-6,250,000.00 COMMIT TO PUR GNMA SF MTG 14-1ul-1999 5,861,328.13
OIN060684 6.00%8115/2028 24-Aug-1999 -5,861,329.13
BC GOLDMAN SACHS&CO,NY 0.00
LONG TERM OPER-PIMCO
-10,500,000.00 COMMIT TO PUR GNMA SF MTG 14-Jul-1999 10,135,781.25
OING62680 6.500%08/152029 24-Aug-1999 -10,135,781.25
BC LEHMAN BROS INC.NJ 0.00
LONG TERM OPER-PIMCO
6,250,000.00 COMMIT TO PUR GNMA SF MTG 14-Jul-1999 -5,961,328.13
OIND60684 6.00%8/152028 24-Aug-1999 5,861,328.13
B GOLDMAN SACHS&CO,NY 0.00
LONG TERM OPER-PIMCO
6,250,000.00 COMMIT TO PUR GNMA SF MTG 14-1ul-1999 -5,861.328.13
OIN060694 6.00%8/152028 24-Aug-1999 0.00
FC GOLDMAN SACHS&CO,NY 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
325,010.45 GNMA POOL#0470242 14-1ul-1999 -313,736.65
36209FLX5 6.500%04/152029 DO 04/01/ 24•Aug-1999 313,736.65
B LEHMAN BROS INC,NJ 0.00
07-Sep-1999 16.01:06 Exec u.Wwkb.x h
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 10
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOUDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAINILOSS
LONG TERM OPER-PIMCO
325,010.45 GNMA POOL80470242 14-Jul-1999 -1,349.70
36209FLX5 6.500%04/15/2029 DO 04/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
325,010.45 GNMA POOLd0470242 14-Jul-1999 -315,086.35
36209FLX5 6.500%04/152029DD04/01/ 24-Aug-1999 0.00
PC LEHMAN BROS INC,NJ 24-AugA999 0.00
LONG TERM OPER-PIMCO
328,826.36 GNMA POOL#0472936 14-Jul-1999 -317,420.20
36209ILRO 6.5009/6 05/152029 DID 05/01/ 24-Aug-1999 317A20.20
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
328.826.36 GNMA POOLM0472936 14-Jul-1999 -1,365.54
36209JLRO 6.500%05/152029DD05/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
329,926.36 GNMA POOL80472936 144ul-1999 -319,785.74
362091LR0 6.500%05/152029DD05/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
259.705.79 GNMA POOL#0492723 14-Jul-1999 -249,731.93
36210HLC4 6.500%04/152029 DO 041011 24-Aug-1999 249,731.93
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
258,705.79 GNMA POOL80492723 14-Jul-1999 -1,074.35
36210HLC4 6.500%04/15/2029DD04/01/ 24-Aug-1999 0.00
IB 0.00
07-Sep-1999 16.01:06 Exec dw Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 11
PORTFOLIO DETAIL
Ocs000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLiDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
259,705.79 GNMA POOLN0492723 14-Jul-1999 -250,806.28
36210HLC4 6.500%04/152029 DD 04/011 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
911,532.00 GNMA POOLM0493503 14-Ju1-1999 -979,913.23
36210JOL6 6.5000/08/152029 DD 08/01/ 24-Aug-1999 879,913.23
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
911,532.00 GNMA POOLM0493503 14-Jul-1999 -3,785.39
36210JGL6 6.500%08/152029DD08/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
911,532.00 GNMA POOLN0493503 14-lu1-1999 -883,698.62
36210JGL6 6.5000/a 08/152029 DD 08/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
88,567.40 GNMA POOL 90494334 14-Jul-1999 -95,495.22
3621OKEFS 6.500%02/152029 DO 02/01/ 24-Aug-1999 85,495.22
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
88,567.40 GNMA POOL#0494334 14-Jul-1999 -367.80
36210KEF8 6.500%02/15/2029 DD 02/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
98,567.40 GNMA POOL#0494334 14-Jul-1999 -85,863.02
36210KEF8 6.500%02/152029 DO 021011 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
07-5eµ1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 12
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPLDATE GAINMOSS
LONG TERM OPER-PIMCO
371,690.56 GNMA POOL N0494334 14-Jul-1999 -358,787.99
36210KEF8 6.500%02/15/2029 DD 02/011 24-Aug-1999 358,787.89
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
371,680.56 GNMA POOL80494334 14-Jul-1999 -1,543.51
36210KEF6 6.500%02/15/2029DD02/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
371,680.56 GNMA POOL#0494334 14-1ul-1999 -360,331.40
3621OKEFB 6.5000/.02/15/2029 DD 02/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NI 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
532,330.09 GNMA POOL80494334 14-1ul-1999 -513,864.89
16210KEF8 6.500%02/15/2029DD02/01/ 24-Aug-1999 513.864.89
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
532,330.09 GNMA POOL#0494334 14-Jul-1999 -2,210.65
3621OKEF8 6.300%02/15/2029 DO 02/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
532,330.09 GNMA POOL#0494334 14-1ul-1999 -516,075.54
36210KEF8 6.50091.02/152029 DD 02/011 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
235,166.45 GNMA POOL80494821 14-Jul-1999 -227,009.11
36210KVN2 6.500%05/15/2029 DD OS/01/ 24-Aug-1999 227,009.11
B LEHMAN BROS INC,NJ 0.00
07-Sep-1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 13
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITYID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAINILOSS
LONG TERM OPER-PIMCO
235,166.45 GNMA POOL#0494821 144u1-1999 -976.59
36210KVN2 6.500%05/152029 DD 051011 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
235,166.45 GNMA POOLR0494821 14-Jul-1999 -227,985.70
36210KVN2 6.500%05/152029 DO 0510V 24-Aug-1999 0.00
FC LEHMAN BROS MG NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
370,478.44 GNMA POOL#0495894 14-Jul-1999 -357,627.47
36210L3B7 6.500%01/152029 DD 011011 24-Aug-1999 357,627.47
B LEHMAN BROS INC,NJ 0.00
LONGTERM OPER-PIMCO
370,478.44 GNMA POOL80495894 14-Jul-1999 -1,539.51
362101,3137 6.500%01/152029DD01/0l/ 24-Aug-1999 0.00
IS 0.00
LONGTERM OPER-PIMCO
370,478.44 GNMA POOL#0495894 14-Jul-1999 -359,165.98
36210L3B7 6.500%01/152029 DD 01/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NI 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
232,602.90 GNMA POOL#0498391 14-Jul-1999 -224,534.49
36210PUQ5 6.500%02/152029 DD 02101/ 24-Aug-1999 224,534.49
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
232,602.90 GNMA POOL80498391 14-1ul-1999 -965.95
36210PUQ5 6.500%02/152029 DD 02/01/ 24-Aug-1999 0.00
18 0.00
07Srp1999 16:01:06 Ece wm ft kbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 14
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
232,602.90 GNMA POOL#0498391 14-Jul-1999 -225,500.44
36210PUQ5 6.500%02/15/2029 DO 02/011 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
557,917.69 GNMA POOL#0498534 14-Jul-1999 -538,469.39
3621 OPY73 6.500%06/15/2029 DO 06/01/ 24-Aug-1999 539,469.39
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
557,817.69 GNMA POOL#0498534 14-Jul-1999 -2,316.49
3621OPY73 6.50D%06/15/2029 DO 06/011 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
557,817.69 GNMA POOL80498534 14-Jul-1999 -540,784.88
3621OPY73 6.500%06/IS/2029 DO D6/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
697,833.54 GNMA POOL80499674 14Jul-1999 -673,627.44
36210RCK4 6.50D%02/1 52 0 2 9DD02/01/ 24-Aug-1999 673,627.44
B LEHMAN BROS INC,NI 0.00
LONG TERM OPER-PIMCO
697,933.54 GNMA POOL#0499674 14-Jul-1999 -2,897.95
36210RCK4 6.500%02/152029 DO 02/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
697,833.54 GNMA PGOL80499674 14-Jul-1999 -676,525.39
36210RCK4 6.500°/h02/152029 DO 02/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
07-Sep-1999 16..01:06 EYeeurm Wwkb.n h
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 15
PORTFOLIO DETAIL
Ocsc000l0000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAINMOSS
LONG TERM OPER-PIMCO
671,273.14 GNMA POOL#0501389 144u1-1999 -647,988.35
36210S7A0 6.500%03/15/2029DD03/01/ 24-Aug-1999 647,988.35
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
671,273.14 GNMA POOL#0501389 14-Jul-1999 -2,787.65
36210S7A0 6.500%03/15/2029DD03/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
671,273.14 GNMA POOL#0501389 14-Jul-1999 -650,776.00
36210S7A0 6.500%03/15/2029DD03/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
672,719.98 GNMA POOL#0502573 14-Jul-1999 -649,385.01
36210WS3 6.500%07/15/2029 DO 07101/ 24-Aug-1999 649,385.01
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
672,719.98 GNMA POOL#0502573 14-Jul-1999 -2,793.66
36210UJS3 6.500%07/15/2029 DD 07/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
672,719.98 GNMA POOL90502573 14-Jul-1999 -652,178.67
3621OUJS3 6.500%07/15/2029DD07/011 24-Aug-1999 0.00
FC LEHMAN BROS D4C,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
248,992.62 GNMA POOL#0502720 14-Jul-1999 -240,355.69
36210UPD9 6.5001/607/1512029 DD 07/OI/ 24-Aug-1999 240,355.69
B LEHMAN BROS MC,NJ 0.00
07-Sep-/999 I6:01:06 ExeculNe Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 16
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAINILOSS
LONG TERM OPER-PIMCO
248,992.62 GNMA POOL80502720 14-Jul-1999 -1,034.01
36210UPD9 6.500%07/152029DD07/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
248,992.62 GNMA POOL W0502720 14-Jul-1999 -241,389.70
36210UPD9 6.5000/007/15/2029DD07/01/ 24-Aug-1999 0.00
FC LEHMAN BROS MC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
359,600.93 GNMA POOLN0502732 14-Jul-1999 -347,127.27
36210UPR8 6.500Yo07/152029 DD 071011 24-Aug-1999 347,127.27
B LEHMAN BROS INC.NJ 0.00
LONG TERM OPER-PIMCO
359,600.93 GNMA POOLN0502732 14-1ul-1999 -1,493.34
36210UPR8 6.500"/e07/152029 DO 07/011 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
359.600.93 GNMA POOL#0502732 14-Jul-1999 -348,620.61
36210UPRS 6.500%0 711 5202 9 DO 07/011 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
270,020.03 GNMA POOLN0505576 14-Jul-1999 -260,653.71
3621OXT98 6.500°A 04/152029 DD 041011 24-Aug-1999 260,653.71
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
270,020.03 GNMA POOLN0505576 14-Jul-1999 -1,121.33
3621OXT98 6.500%04/152029DD04/01/ 24-Aug-1999 0.00
IB 0.00
07-S.,1999 16.01:06 E wiv Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 17
PORTFOLIO DETAIL
OCSG000JWW 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
270,020.03 GNMA POOL80505576 14-Jul-1999 -261,775.04
36210XT98 6.500%04/152029 DD 04/011 24-Aug-1999 0.00
FC LEHMAN BROS INC,NI 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
299,014.48 GNMA POOL00506895 14-Jul-1999 -288,642.42
36211 ACV 6.500%05/15/2029 DD 05101/ 24-Aug-1999 288,642.42
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
299,014.48 GNMA POOL80506895 14-Jul-1999 -1,241.74
36211 AC87 6.500%05/152029 DD 05/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
299,014.48 GNMA POOL40506895 14-1ul-1999 -299,994.16
3621 IAC87 6.500%05/152029 DD 05/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
442,281.73 GNMA POOL 80509960 14-Jul-1999 426,940.08
36211 DQM5 6.300%06/152029 DO 06/01/ 24-Aug-1999 426,940.09
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
442,291.73 GNMA POOL80509960 14-Jul-1999 -1,836.70
36211 DQM5 6.500%06/152029 DD 06/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
442,281.73 GNMA POOL80509960 14-Jul-1999 429,776.79
36211 DQM5 6.500%061152029 DD 06/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
07-SW-1999 16:01:06 E.,cuuw Wwk6cncA
Q ORANGE COUNTY SANITATION DISTRICT PAGE.. 18
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
500,050.00 GNMA POOL#0481620 14-Jul-1999 -482,704.52
36209UAV8 6.500%08/152029 DO 08/01/ 24-AugA999 482,704.52
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
500,050.00 GNMA POOL40481620 14-Jul-1999 .2,076.60
36209UAV8 6.500°.508/152029DDOg/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
500,050.00 GNMA POOL#0481620 14-Jul-1999 -484,781.12
36209UAV8 6.5005e08/152029 DD 08/01/ 24-Aug-1999 0.00
FC LEHMAN BROS MC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
302,265.99 GNMA POOL#0486958 14-Jul-1999 ,291,781.04
36210ASTO 6.500%021152029DD02/01/ 24-Aug-1999 291,781.04
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
302,265.89 GNMA POOL#0486958 14-Jul-1999 -1,255.24
3621OA5TO 6.500%02/152029DD02/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
302,265.89 GNMA POOL#0486959 14-Jul-1999 -293,036.28
3621OA5TO 6.5009/.0211512029 DO 02/01/ 24-Aug-1999 0.00
FC LEHMAN BROS D4C,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
327,379.50 GNMA POOL#0486958 14-Jul-1999 -316,023.52
3621OA5TO 6.500%021152029DD02/01/ 24-Aug-1999 316,023.52
B LEHMAN BROS INC,NJ 0.00
07-&e 1999 16:0/:06 EYecutiw Wwkbench
Q ORANGE COUNTY SANITATION DISTRICT PACE: -19
PORTFOLIO DETAIL
00000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
327,379.50 GNMA POOLN0486958 14-Jul-1999 -1,359.53
36210A5TO 6.500%02/1512029 DD 02/01/ 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
327,379.50 GNMA POOLW0486958 14-Jul-1999 -317,383.05
3621OA5TO 6.500%02/152029 DO 02/011 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-19919 0.00
LONG TERM OPER-PIMCO
297,915.02 GNMA POOL 90490170 14-1ul-1999 -287,581.09
36210EQXO 6.500%04/152029 DD 04/01/ 24-Aug-1999 287,581.09
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
297,915.02 GNMA POOLA0490170 14-1u1-1999 -1,237.17
36210EQX0 6.500%04/152029 DD 04/01/ 24-Aug-1999 0.00
113 0.00
LONG TERM OPER-PIMCO
297,915.02 GNMA POOLk0490170 14-Jul-1999 -289,818.26
36210EQXO 6.500%04/152029DD04/OI/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
303,408.46 GNMA POOL80492485 14-Jul-1999 -292,883.98
36210HCWO 6.500%04/15/2029 DD 04/01/ 24-Aug-1999 292,883.98
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
303,408.46 GNMA PGOL80492485 14-Ju1-1999 -1,259.99
36210HCWO 6.500%04/152029 DO 04/01/ 24-Aug-1999 0.00
IB 0.00
07-&p-1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 20
PORTFOLIO DETAIL
ocsG000l0000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESMAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
303,408.46 GNMA POOL#0492485 14-1ul-1999 -294,143.97
36210HCW0 6.500%0 411 5/2 02 9 DD 04/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
492,401.06 GNMA POOL80486958 14-1ul-1999 -475,320.90
36210AST0 6.500%02/15/2029DD02/01/ 24-Aug-1999 475,320.90
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
492.401.06 GNMA POOL#0486958 14-Jul-1999 -2,044.83
36210A5T0 6.500%02/15/2029 DO 02/011 24-Aug-1999 0.00
IB 0.00
LONG TERM OPER-PIMCO
492.401.06 GNMA POOL#0486958 14-1ul-1999 -477,365.73
36210AST0 6.500%02/152029DD02/01/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
403,169.89 GNMA POOLW0482943 14-Jul-1999 -389,184.93
36209VP40 6.500%01/152029DD01/0l/ 24-Aug-1999 389,184.93
B LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
403,169.99 GNMA POOL M0482943 14-Jul-1999 -1,674.27
36209VP40 6.500%0 111 52 0 2 9 DO 01/01/ 24-Aug-1999 0.00
111 0.00
LONG TERM OPER-PIMCO
403,169.89 GNMA POOL80482943 14-Jul-1999 -390,859.20
36209VP40 6.500%01115/2029DD01/0l/ 24-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 24-Aug-1999 0.00
07Sep-1999 16:01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 21
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
12,000,000.00 COMMITTO PUR GNMA SF MTG 16-1u1-1999 -11,59I,250.00
OIN062680 6.500%08/15/2029 24-Aug-1999 0.00
FC BEAR STEARNS&CO INC,NY 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
12,000,000.00 COMMIT TO PUR GNMA SF MTG 02-Aug-1999 -11,362,500.00
OIN062698 6.500%09/15/2028 21-Sep-1999 11,362,500.00
B BEAR STEARNS&CO INC,NY 0.00
LIQUID OPER-PIMCO
300,000.00 LEHMAN BROS HLDGS MTN TR 003 05-Aug-1999 -304,350.00
52517PPQ8 8.150%05/152000 DO 10/16/9. 10-Aug-1999 304,350.00
B LEHMAN BROS MC,NJ 0.00
LIQUID OPER-PIMCO
300,000.00 LEHMAN BROS HLDGS MTN TR 003 05-Aug-1999 -11,995.42
52517PPQB 8.150Ya05115/2000 DO 10/16(9 10-Aug-1999 0.00
IS 0.00
LIQUID OPER-PIMCO
300,000.00 LEHMAN BROS HLDGS MTN TR 003 05-Aug-1999 -316.235.42
52517PPQS 8.150%05/152000 DO 10116/9 10-Aug-1999 0.00
FC LEHMAN BROS ING NJ 10-Aug-1999 0.00
LONG TERM OPER-PIMCO
10,500,000.00 COMMIT TO PUR GNMA SF MTG 06-Aug-I999 -9,879,843.75
OIN062699 6.500%09/152029 21-Sep-1999 9,879,843.75
E DEUTSCHE BK SEC INC,NEW YOR 0.00
LONG TERM OPER-PIMCO
6,250,000.00 COMMIT TO PUR GNMA SF MTG 09-Aug-1999 -5,658,203.13
OIN060692 6.00%9/152028 21-Sep-1999 5,658,203.13
B GOLDMAN SACHS&CO,NY 0.00
07-&p-1999 16.0106 &s cutme Waskbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE. 22
PORTFOLIO DETAIL
Ocsc000l0000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LASS
LONG TERM OPER-PIMCO
730,000.00 COMMIT TO PUR FNMA I ITH I I-Aug-1999 -712,206.25
11F011693 VAR RT 09/012029 23-Sep-1999 712,206.25
B GOLDMAN SACHS&CO,NY 0.00
LONG TERM OPER-PIMCO
500,000-00 GREEN TREE CORP 99-D CL A-1 13-Aug-1999 500,000.00
3935052Y7 6.290%10/152013 DO 082619 26-Aug-1999 500,000.00
B MORGAN I P SECS INC,NEW YOR 0.00
LONG TERM OPER-PIMCO
500,000.00 GREEN TREE CORP 99-D CL A-1 13-Aug-1999 -500,000.00
3935052Y7 6.290%10/15/2013 DO 08/26/9 26-Aug-1999 0.00
FC MORGAN I P SECS INC,NEW YOR 26-Aug-1999 0.00
PAY UPS
FIXED INCOME SECURITIES
LONG TERM OPER-PIMCO
3.50 FHLMC MULTICLASS CIT E3 A 01-Aug4999 -3.50
3133TCE95 6.324%08/152032 01-Aug-1999 3.50
PU 0.00
LONG TERM OPER-PIMCO
3.50 FHLMC MULTICLASS CIF E3 A 01-Aug-1999 .3.50
3133TCE95 6.324%08/152032 01-Aug-1999 0.00
FC 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
11,581.02 FHLMC MULTICLASS CTF SER 162 01-Aug-1999 -11,581.02
3133T17A4 6.000%11/152023 DO 11/01/9 01-Aug-1999 11,581.02
PU 0.00
07-Sep-1999 16:01.:06 Erecudve Workbench
Q ORANGE COUNTY SANITATION DISTRICT PACE: 23
PORTFOLIO DETAIL
OCSG000lW00 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAINILOSS
LONG TERM OPER-PIMCO
11,581.02 FHLMC MULTICLASS CTF SER 162 01-Aug-1999 -11,581.02
3133T17A4 6.0001/o 11/15/2023 DO 11/01/9 01-Aug-1999 0.00
FC 17-Aug-1999 0.00
SALES
CASH&CASH EQUIVALENTS
LONG TERM OPER-PIMCO
4,200,000.00 FEDERAL HOME LN MTG CORP DIS 304u1-1999 4,188,356.67
313396KQ5 MAT08119/1999 30-Jul-1999 0.00
FC GOLDMAN SACHS&CO,NY 02-Aug-1999 0.00
LONG TERM OPER-PIMCO
-8,191,978.67 DREYFUS TREASURY CASH MGMT 03-Aug-1999 8,191,978.67
996085247 03-Aug-1999 -8,191,978.67
S 0.00
LONG TERM OPER-PIMCO
-9.191,978.67 DREYFUS TREASURY CASH MGMT 03-Aug-1999 8,191,978.67
996085247 03-Aug-1999 0.00
FC 03-Aug-1999 0.00
LONG TERM OPER-PIMCO
-9.35 DREYFUS TREASURY CASH MGMT 06-Aug-1999 9.35
996095247 06-Aug-1999 -9.35
S 0.00
LONGTERM OPER-PIMCO
-9.35 DREYFUS TREASURY CASH MGMT 06-Aug-1999 9.35
9%085247 06-Aug-1999 0.00
FC 06-Aug-1999 0.00
07Sep-1999 16:01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 24
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSLI-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LIQUID OPER-PIMCO
-1.70 DREYFUS TREASURY CASH MGMT 06-Aug-1999 1.70
996085247 06-Aug-1999 -1.70
S 0.00
LIQUID OPER-PIMCO
-1.70 DREYFUS TREASURY CASH MGMT 06-Aug-1999 1.70
996085247 06-Aug-1999 0.00
FC 06-Aug-1999 0.00
LONG TERM OPER-PIMCO
-272,162.50 DREYFUS TREASURY CASH MGMT 09-Aug-1999 272,162.50
996085247 09-Aug-1999 ,272,162.50
S 0.00
LONG TERM OPER-PIMCO
-272,162.50 DREYFUS TREASURY CASH MGMT 09-Aug-1999 272,162.50
996085247 09-Aug-1999 0.00
FC 09-Aug-1999 0.00
LIQUID OPER-PIMCO
-316,235.42 DREYFUS TREASURY CASH MGMT 10-AugA999 316,235.42
996095247 10-Aug-1999 -316,235.42
S 0.00
LIQUID OPER-PIMCO
-316,235.42 DREYFUS TREASURY CASH MGMT 10-Aug-1999 316,235.42
996095247 10-Aug-1999 0.00
FC 10-Aug-1999 0.00
LONG TERM OPER-PIMCO
-3,903.70 BSDT-LATE MONEY DEP ACCT 17-Aug-1999 3,903.70
996087094 VAR RT DO 0626/1997 17-Aug-1999 -3,903.70
S 0.00
07Sep-1999 16.01:06 Execu iw Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 15
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST!
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
-2,154,071.30 DREYFUS TREASURY CASH MGMT 18-Aug-1999 2,154,071.30
996085247 19-Aug-1999 -2,154,071.30
S 0.00
LONG TERM OPER-PIMCO
-2,154,071.30 DREYFUS TREASURY CASH MGMT 18-Aug-1999 2,154,071.30
996085247 18-Aug-1999 0.00
FC 18-Aug-1999 0.00
LONG TERM OPER-PIMCO
-14,492.23 BSDT-LATE MONEY DEP ACCT 19-Aug-1999 14,492.23
996087094 VAR RT DO 06/26/1997 19-Aug-1999 -14,482.23
S 0.00
LONG TERM OPER-PIMCO
-78,597.45 DREYFUS TREASURY CASH MGMT 19-Aug-1999 78,587.45
996085247 19-Aug-1999 -78,587.45
S 0.00
LONG TERM OPER-PIMCO
-78,587.45 DREYFUS TREASURY CASH MGMT 19-Aug-1999 79,587.45
996085247 19-Aug-1999 0.00
FC 19-Aug-1999 0.00
LONG TERM OPER-PIMCO
-2,100,000.00 LEHMAN BROTHERS REPO 19-Aug-1999 2,100,000.00
99361M668 04.860%08/19/1999 DO 09/181 19-Aug-1999 -2,100,000.00
S LEHMAN BROS INC,NJ 0.00
LONG TERM OPER-PIMCO
-2,100,000.00 LEHMAN BROTHERS REPO 19-Aug-1999 283.50
99361 M668 04.960%09/19/1999 DD OS/19/ 19-Aug-1999 0.00
is 0.00
07-Sep1999 /6:01:06 &ecwiw FV rkbencR
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 26
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
-2,100,000.00 LEHMAN BROTHERS REPO 19-Aug-1999 2,100,283.50
9936IM668 04.860%08/19/1999 DO 08/18/ 19-Aug-1999 0.00
FC LEHMAN BROS INC,NJ 19-Aug-1999 0.00
LONG TERM OPER-PIMCO
,500,000.00 DREYFUS TREASURY CASH MGMT 26-AugA999 500,000.00
996095247 26-Aug-1999 ,500,000.00
S 0.00
LONG TERM OPER-PIMCO
-500,000.00 DREYFUS TREASURY CASH MGMT 26-Aug-1999 500,000.00
996085247 26-Aug-1999 0.00
FC 26-Aug-1999 0.00
FIXED INCOME SECURITIES
LONG TERM OPER-PIMCO
-8,000,000.00 U S TREASURY NOTES 30-Jul-1999 8,279,661.89
912827Z54 06.375%09/30/2001 DD 09/301 02-Aug-1999 0.00
FC WARBURG DILLON READ LLC,NEW 02-Aug-1999 0.00
LONG TERM OPER-PIMCO
-12,000,000.00 COMMIT TO PUR GNMA SF MTG 02-AugA999 11,375,625.00
OIN062680 6.500%08/1512029 24-Aug-1999 -11,591,250.00
S BEAR STEARNS&CO INC,NY ,215,625.00
LONG TERM OPER-PIMCO
-12,000,000.00 COMMITTOPURGNMASFMTG 02-Aug-1999 11,375,625.00
OIN062680 6.500%08/15/2029 24-Aug-1999 0.00
FC BEAR STEARNS&CO INC,NY 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-403,169.89 GNMA POOL 90482943 06-Aug-1999 379,798.64
36209VP40 6.5009/o 01/15/2029 DO 01/01/ 24-Aug-1999 -389,184.93
S DEUTSCHE BK SEC INC,NEW YOR -9.386.29
07-.Sep-/999 16.01:06 Ececutiw Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 27
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
-403,169.89 GNMA POOL#0492943 06-Aug-1999 1,674.27
36209VP40 6.500%01/15/2029 DO 011011 24-Aug-1999 0.00
1s 0.00
LONG TERM OPER-PIMCO
,403,169.89 GNMA POOL#0492943 06-Aug-1999 381,472.91
36209VP40 6.500%01/15/2029 DO 01/01/ 24-Aug-1999 0.00
PC DEUTSCHE BK SEC INC,NEW YOR 26-Aug-1999 0.00
LONG TERM OPER-PIMCO
-302,265.89 GNMA POOL#0436958 06-Aug-1999 284,743.91
36210A5T0 6.500%02/15/2029 DO 02101/ 24-Aug-1999 ,291,791.04
S DEUTSCHE BK SEC INC,NEW YOR .7,037.13
LONG TERM OPER-PIMCO
-302.265.99 GNMA POOL#0496959 06-Aug-1999 1,255.24
36210A5T0 6.500%02/15/2029 DO 02/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-302.265.89 GNMA POOL80486958 06-Aug-1999 285,999.15
36210A5T0 6.500%02/15/2029DD02/01/ 24-Aug-1999 0.00
PC DEUTSCHE BK SEC INC,NEW YOR 26-Aug-1999 0.00
LONG TERM OPER-PIMCO
-327,379.50 GNMA POOL#0486959 06-Aug-1999 308.401.72
36210A5T0 6.500°A02/15/2029 DO 02/011 24-Aug-1999 -316,023.52
S DEUTSCHE BK SEC INC,NEW YOR .7,621.80
LONG TERM OPER-PIMCO
-327,379.50 GNMA POOL80486958 06-Aug.1999 1,359.53
36210A5T0 6.500%02/15/2029 DO 02101/ 24-Aug-1999 0.00
IS 0.00
07-Sep1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 28
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
-327,379.50 GNMA POOL 90486958 06-Aug-1999 309,761.25
36210A5T0 6.500%02/15/2029 DO 02/011 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 26-Aug-1999 0.00
LONG TERM OPER-PIMCO
-092,401.06 GNMA POOL80486958 06-Aug-1999 463,857.19
36210ASTO 6.500%02/15/2029DD02/01/ 24-Aug-1999 -475,320.90
S DEUTSCHE BK SEC INC,NEW YOR -11,463.71
LONG TERM OPER-PIMCO
492,401.06 GNMA POOLN0486958 06-Aug-1999 2,044.83
36210A5T0 6.500%02/15/2029DD02/01/ 24-Aug-1999 0.00
15 0.00
LONG TERM OPER-PIMCO
-492,401.06 GNMA POOL80486958 06-Aug-1999 465,902.02
36210A5T0 6.5009/9 02/15/2029 DO 02/011 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 26-Aug-1999 0.00
LONG TERM OPER-PIMCO
-249.992.62 GNMA POOL#0502720 06-Aug-1999 234,558.83
36210UPD9 6.500%07/15/2029 DO 07/01/ 24-Aug-1999 -240,355.69
S DEUTSCHE BK SEC INC,NEW YOR -5,796.86
LONG TERM OPER-PIMCO
-248,992.62 GNMA POOLR0502720 06-Aug-1999 1,034.01
36210UPD9 6.500%07/15/2029DD07/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-248,992.62 GNMA POOL#0502720 06-Aug-1999 235,592.84
36210UPD9 6.500%07/15/2029 DO 071011 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 25-Aug-1999 0.00
07-Sep-1999 I6:01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PACE: 29
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
-325,010.45 GNMA POOL#0470242 06-Aug-1999 306,170.00
36209FLX5 6.500%04/152029 DO 04/01/ 24-Aug-1999 -313,736.65
S DEUTSCHE BK SEC INC,NEW YOR -7,566.65
LONG TERM OPER-PIMCO
-325,010.45 GNMA POOL#0470242 06-Aug-1999 1,349.70
36209FLX5 6.500%04/15/2029DD04/01/ 24-AugA999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-325,010.45 GNMA POOL#0470242 06-Aug.1999 307,519.70
36209FLX5 6.500%04/15/2029 DD 04/011 24-AugA999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONGTERM OPER-PIMCO
-328,826.36 GNMA POOL N0472936 06-Aug-1999 309,764.71
36209JLRO 6.500%05/152029 DO 051011 24-Aug4999 -317,420.20
S DEUTSCHE BK SEC INC,NEW YOR -7,655.49
LONG TERM OPER-PIMCO
-328,826.36 GNMA POOL#0472936 O6-Aug-1999 1,365.54
36209JLRO 6.5009/605/15/2029 DO 051011 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-329,826.36 GNMA POOL#0472936 06-Aug-1999 311,130.25
36209JLRO 6.500%05/15/2029 DO 051011 24-Aug-1999 0.00
FC DEUTSCHE RK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-500,050.00 GNMA POOL 00481620 06-Aug-1999 471,062.73
36209UAV8 6.500%09/152029 DO 08/01/ 24-Aug-1999 482,704.52
S DEUTSCHE BK SEC INC,NEW YOR -11,641.79
07-Sep-/999 16.01:06 Executive IPwkbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 30
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
-500,050.00 GNMA POOL80481620 06-Aug-1999 2,076.60
36209UAV8 6.500%08/15/2029DD08/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-500,050.00 GNMA POOL80481620 06-Aug-1999 473,139.33
36209UAVS 6.500%08H52029DD08/01/ 24-Aug-1999 0.00
PC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-297,915.02 GNMA POOL#0490170 06-Aug-1999 280,645.26
36210EQXO 6.500%04/152029 DO 04/011 24-Aug-1999 -287,581.09
S DEUTSCHE BK SEC INC,NEW YOR -6,935.83
LONG TERM OPER-PIMCO
-297,915.02 GNMA POOL80490170 06-Aug-1999 1,237.17
36210EQXO 6.500%04/152029DD04/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-297,915.02 GNMA POOLg0490170 06-Aug-1999 281,882.43
36210EQXO 6.500%04/152029DD04/01/ 24-Aug-1999 0.00
PC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-303.408.46 GNMA POOL#0492495 06-Aug-1999 295,820.25
36210HCW0 6.5000A 04/152029 DD 04/011 24-Aug-1999 -292,983.98
S DEUTSCHE BK SEC INC,NEW YOR -7,063.73
LONG TERM OPER-PIMCO
-303,408.46 GNMA POOLND492485 06-Aug-1999 1,259.99
36210HCWO 6.500%04/152029DD04/01/ 24-Aug-1999 0.00
IS 0.00
07Seµ1999 16.01:06 Executive Wwkb.-u
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 31
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
303.409.46 GNMA POOL80492485 06-Aug.1999 287,080.24
36210HCWO 6.500%04/152029DD04/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug.1999 0.00
LONG TERM OPER-PIMCO
-258,705.79 GNMA POOL#0492723 06-Aug-1999 243,708.94
36210HLC4 6.500%04/152029 DO 04/01/ 24-Aug.1999 -249.731.93
S DEUTSCHE BK SEC INC,NEW YOR -6,022.99
LONG TERM OPER-PIMCO
,258,705.79 GNMA POOL80492723 06-Aug-1999 1,074.35
36210HLC4 6.500%04/152029DD04/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-258,705.79 GNMA POOL#0492723 06-Aug-1999 244,783.29
36210HLC4 6.500%04/152029 DO 04/0U 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-911,532.00 GNMA POOL 00493503 06-Aug-1999 $59,691.63
362101GL6 6,500%08/152029 DO 08/011 24-Aug-1999 479,913.23
S DEUTSCHE BK SEC INC,NEW YOR -21,221.60
LONG TERM OPER-PIMCO
-911,532.00 GNMA POOL80493503 06-Aug-1999 3,783.39
3621010L6 6.500%08/152029DD08/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-911,532.00 GNMA POOL80493503 06-Aug-1999 862,477.02
3621WGL6 6.500%0S/152029DD08/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
07-Sep-1999 16.01:06 Execmiw Wmkb..h
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 31
PORTFOLIO DETAIL
OcsG000l0000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAINILOSS
LONG TERM OPER-PIMCO
-532,330.09 GNMA POOL#0494334 06-Aug-1999 501,471.58
36210KEF8 6.500%02/152029 DD 02/01/ 24-Aug-1999 -513,864.89
S DEUTSCHE BK SEC INC,NEW YOR .12,393.31
LONG TERM OPER-PIMCO
,532,330.09 GNMA POOL80494334 06-Aug-1999 2,210.65
36210KEF8 6.5001%02/192029 DO 021011 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-532,330.09 GNMA POOLA0494334 06-Aug-1999 503,682.23
36210KEF8 6.5009/602/15/2029DD02/01/ 24-Aug-1999 0.00
PC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-I999 0.00
LONG TERM OPER-PIMCO
-88,567.40 GNMA POOL 00494334 06-Aug-1999 83,433.26
36210KEF8 6.5009A02/15/2029 DO 02/01/ 24-Aug-1999 45,495.22
S DEUTSCHE BK SEC INC,NEW YOR -2,061.96
LONG TERM OPER-PIMCO
.88,567.40 GNMA POOL 90494334 06-Aug-1999 367.80
36210KEF8 6.500%02/15/2029 DO 02/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-88,567.40 GNMA POOLd0494334 06-Aug-1999 83,801.06
36210KEF8 6.500%02/152029DD02/01/ 24-Aug.1999 0.00
PC DEUTSCHE BK SEC INC,NEW YOR 25-Aug-1999 0.00
LONGTERM OPER-PIMCO
-371,680-56 GNMA POOL#0494334 06-Aug-1999 350,134.70
36210KEF8 6.500%02/15/2029 DO 02/011 24-Aug-1999 -358,787.89
S DEUTSCHE BK SEC INC,NEW YOR .8,653.19
07-Sep4999 16:01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 33
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
-371,680.56 GNMA POOL80494334 06-Aug-1999 1,543.51
36210KEF8 6.500%02115/2029 DD 02/011 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-371,630.56 GNMA POOL#0494334 06-Aug-1999 351,679.21
36210KEF8 6.500%02/15/2029 DO 02/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-235,166.45 GNMA POOLd0494821 06-Aug-1999 221,534.14
36210KVN2 6.5001/ 05/15/2029DD05/01/ 24-Aug-1999 -227,009.11
S DEUTSCHE BK SEC INC,NEW YOR -5,474.97
LONG TERM OPER-PIMCO
-235,166.45 GNMA POOL80494821 06-Aug-1999 976.59
36210KVN2 6.500%05/152029DD05/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-235,166.45 GNMA POOL 00494921 06-Aug-1999 222,510.73
36210KVN2 6.500%05/15/2029 DD 05/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-370,478.44 ONMA POOL80495894 06-Aug-1999 349,002.27
3621OL387 6.5000/o01/15/2029DDOI/01/ 24-Aug-1999 -357,627.47
S DEUTSCHE BK SEC INC,NEW YOR -8,625.20
LONG TERM OPER-PIMCO
-370,479.44 GNMA POOL#0495894 06-Aug-1999 1,539.51
36210L3B7 6.500%01/152029 DO 01/01/ 24-Aug-1999 0.00
IS 0.00
07-Sep-1999 16.01:06 Executive Wmkbmh
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 34
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
-370,478.44 GNMA POOLN0495894 06-Aug-1999 350,540.78
36210L3B7 6.50W .01/15/2029DD01/0l/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-232,602.90 GNMA POOL80498391 06-Aug-1999 219,119.20
36210PUQ5 6.500%02/152029DD02/01/ 24-Aug-1999 -224,534.49
S DEUTSCHE BK SEC INC,NEW YOR -5,415.29
LONG TERM OPER-PIMCO
-232,602.90 GNMA POOL#0498391 06-Aug-1999 965.95
36210PUQS 6.500%02/15/2029 DO 02/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-232,602.90 GNMA POOLg0498391 06-Aug-1999 220,085.15
36210PUQ5 6.500%02/15/2029DD02/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-697,833.54 GNMA POOL#0499674 06-Aug-1999 657,381.00
36210RCK4 6.500%0 211 52 02 9 DO 02/01/ 24-Aug-1999 -673,627.44
S DEUTSCHE BK SEC INC,NEW YOR -16,246.44
LONG TERM OPER-PIMCO
-697,833.54 GNMA POOL#0499674 06-Aug-1999 2,897.95
36210RCK4 6.500%02/152029 DO 021011 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-697,933.54 GNMA POOL#0499674 06-Aug-1999 660,279.95
36210RCK4 6.5001/.02/152029 DO 02/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
07-Sep-1999 16.01:06 Exeeur/ve Workbench
Q ORANGE COUNTY SANITATION DISTRICT PACE 35
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
-671,273.14 GNMA POOL#0501389 06-Aug-1999 632,360.28
36210S7A0 6.500%03/15/2029 DD 03/01/ 24-Aug-1999 -647,998.35
S DEUTSCHE BK SEC INC,NEW YOR -15,628.07
LONG TERM OPER-PIMCO
-671,273.14 GNMA POOL80501389 06-Aug-1999 2,787.65
36210S7A0 6.500%03/152029DD03/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-671,273.14 GNMA POOL#0501389 06-Aug-1999 635,147.93
36210S7A0 6.5000/.03/152029 DO 03/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
672,719.99 GNMA POOL#0502573 06-Aug-1999 633.723.24
36210U1S3 6.500%07/152029 DD 07/01/ 24-Aug-1999 -649,385.01
S DEUTSCHE BE.SEC INC,NEW YOR -15,661.77
LONG TERM OPER-PIMCO
672,719.98 GNMA POOL#0502573 06-Aug-1999 2,793.66
36210U1S3 6.500Ye07/152029 DO 07/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
672,719.98 GNMA POOL#0502573 06-Aug-1999 636,516.90
36210U1S3 6.500%07/152029DD07/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-359,600.93 GNMA POOL 80502732 06-Aug-1999 339,755.31
36210UPR8 6.500%0 711 5 2 0 29 DO 07AH/ 24-Aug-1999 -347,12727
S DEUTSCHE BK SEC INC,NEW YOR -8,371.96
07-Sep-1999 16:01:06 &ecutwe II'wkbench
Q ORANGE COUNTY SANITATION DISTFUCT PAGE: 36
PORTFOLIO DETAIL
GCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOL/DATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
-359,600.93 GNMA POOL#0502732 06-Aug-1999 - 1,493.34
36210UPRS 6.500%07/15/2029 DO 07/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-359,600.93 GNMA POOL#0502732 06-Aug-1999 340,248.65
36210UPR8 6.500%07/152029 DO 071011 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-270,020.03 GNMA POOL80505576 06-Aug-1999 254,367.31
3621OXT98 6.500%04/15/2029DD04/01/ 24-Aug-1999 -260,653.71
S DEUTSCHE BK SEC INC,NEW YOR -6,286.40
LONG TERM OPER-PIMCO
-270,020.03 GNMA POOL80505576 06-Aug-1999 1,121.33
36210XT98 6.500%04/15/2029 DD 04/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-270,020.03 GNMA POOL80505576 06-Aug-1999 255,488.64
3621OXT98 6.500%04/15/2029 DO 04/011 24-Aug-1999 0.00
FC DEUTSCHE BK SEC MC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-299,014.48 GNMA POOL60506895 06-Aug-1999 281,690.98
36211AC87 6.500%05/152029DD05/01/ 24-Aug-1999 -298.642.42
S DEUTSCHE BK SEC INC,NEW YOR -6,%1.44
LONG TERM OPER-PIMCO
-299,014.48 GNMA POOL#0506895 06-Aug-1999 1,241.74
3621IAC87 6.500^/05/152029 DD 05/01/ 24-Aug-1999 0.00
IS 0.00
07-Sep-1999 16.01:06 Execwive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 37
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPLDATE GAINILOSS
LONG TERM OPER-PIMCO
-299,014.48 GNMA POOL 00506893 06-Aug-1999 292,922.72
36211AC87 6.500%05/15/2029 DO 051011 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-442,291.73 GNMA POOL#0509960 06-Aug-1999 416,643.21
36211DQM5 6.500%06/152029 DO 06/01/ 24-Aug-1999 -426.940.08
S DEUTSCHE BK SEC INC,NEW YOR -10,296.87
LONG TERM OPER-PIMCO
-442,281.73 GNMA POOL#0509960 06-Aug-1999 1,836.70
36211 DQM5 6.500%06/152029 DO 06/01/ 24-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-442,281.73 GNMA POOL80509960 06-Aug-1999 418,479.91
36211 DQM5 6.500%06/152029 DO DOI/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-557,917.69 GNMA POOL#0499534 06-Aug-1999 525,481.70
36210PY73 6.500%06/152029 DO 06/01/ 24-Aug-1999 -538,469.39
S DEUTSCHE BK SEC INC,NEW YOR -12,986.69
LONG TERM OPER-PIMCO
-557,817.69 GNMA POOL00498534 06-Aug-1999 2,316.49
3621OPY73 6.500%06/152029DD06101/ 24-Aug-1999 0.00
Is 0.00
LONG TERM OPER-PIMCO
-557,817.69 GNMA POOL80498534 WAug-1999 527,798.19
3621OPY73 6.500%06/15/2029DD06/01/ 24-Aug-1999 0.00
FC DEUTSCHE BK SEC INC,NEW YOR 24-Aug-1999 0.00
07-Sep-/999 16:01:06 &ecmm Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 38
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAINMOSS
LONG TERM OPER-PIMCO
-6,250,000.00 COMMIT TO PUR GNMA SF MTG 09-Aug-1999 5,664,062.50
OIN060694 6.00%8/152028 24-Aug-1999 -5,861,328.13
S GOLDMAN SACHS&CO,NY -197,265.63
LONG TERM OPER-PIMCO
-6,250,000.00 COMMITTO PUR GNMA SF MTG 09-Aug4999 5,664,062.50
OIN060684 6.00%8/15/2028 24-Aug-1999 0.00
FC GOLDMAN SACHS&CO.NY 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
-730,000.00 COMMIT TO PUR FNMA I ITH DIST II-Aug-1999 712,662.50
I IF011685 VAR RT 08/01/2029 25-Aug-1999 -718,821.88
S GOLDMAN SACHS&CO,NY -6,159.39
LONG TERM OPER-PIMCO
-730,000.00 COMMIT TO PUR FNMA I ITH DIST II-Aug-1999 712,662.50
111`011685 VAR RT 08/012029 25-Aug-1999 0.00
FC GOLDMAN SACHS&CO,NY 25-Aug-1999 0.00
LONG TERM OPER-PIMCO
-3,650,054.66 STUDENT LN MKTG ASSN 1997-1 13-Aug-1999 3,621,538.61
78442GAK2 VAR RT 10/252005 DD 0320/9 I&Aug-1999 -3,608,563.80
S MERRILL LYNCH PIERCE FENNER 12,974.81
LONG TERM OPER-PIMCO
-3,650,054.66 STUDENT LN MKTG ASSN 1997-1 13-Aug-1999 12,112.98
78442GAK2 VAR RT 1025/2005 DO 0320/9 18-Aug-1999 0.00
IS 0.00
LONG TERM OPER-PIMCO
-3,650,054.66 STUDENT LN MKTG ASSN 1997-1 13-Aug-1999 3,633,651.59
78442GAK2 VAR RT 10/252005 DD 0320/9 18-Aug-1999 0.00
FC MERRILL LYNCH PIERCE FENNER 18-Aug-1999 0.00
PRINCIPAL PAYMENTS
07-Sep-/999 /6.-0I:06 Execmive Warkbe.M
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 39
PORTFOLIO DETAIL
00G00010000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
FIXED INCOME SECURITIES
LONG TERM OPER-PIMCO
96,578.50 FHLMC MULTICLASS CTF E3 A 01-1u1-1999 -96,579.50
3133TCE95 6.324%08/15/2032 01-Jul-1999 96,694.13
PDC 105.63
LONG TERM OPER-PIMCO
.96,582.00 FHLMC MULTICLASS CTF E3 A 01-Jul-1999 96,582.00
3133TCE95 6.324%09/152032 01-3u1-1999 -96,687.64
PD -105.64
LONG TERM OPER-PIMCO
-96,582.00 FHLMC MULTICLASS CTF E3 A 01-1ul-1999 96,592.00
3133TCE95 6.324%08/152032 01-1u1-1999 0.00
PC 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
-243,922.45 FHLMC GROUP OGS-0476 01-Aug-1999 243,922.45
3128DDQ55 7.000%02/01/2003 DD 02/01/ 01-Aug-1999 -247,733.74
PD -3,811.29
LONG TERM OPER-PIMCO
-243,922.45 FHLMC GROUP NG5-0476 01-Aug-1999 243,922.45
3129DDQ55 7.0000/.02/01/2003 DD 02/011 01-Aug-1999 0.00
PC 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
-57,560.55 GNMA 11 POOL#0090023 01-Aug-1999 57,560.55
36225CAZ9 7.000%1 212 02 0 2 6 DD 12/01/ 01-Aug-1999 -58,513.90
PD -953.35
LONG TERM OPER-PIMCO
-57,560.55 GNMA 11 POOL#0080023 01-Aug-1999 57,560.55
36225CAZ9 7.000%121202026 DD 12/01/ 01-Aug-1999 0.00
FC 20-Aug-1999 0.00
07Sep1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 40
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE CAIN/LOSS
LONG TERM OPER-PIMCO
.45,035.25 FHLMC MULTICL MTG P/C 1574 E 01-Aug-1999 45,035.25
3133T02D5 5.900%06115/2017 01-Aug-1999 .44,971.92
PD 63.33
LONG TERM OPER-PIMCO
45,035.25 FHLMC MULTICL MTG P/C 1574 E 01-Aug-1999 45,035.25
3133T02D5 5.900%06/15/2017 01-Aug-1999 0.00
FC 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
-79,650.00 FHLMC MULTICLASS CTF E3 A 01-Aug-1999 79,650.00
3133TCE95 6.324%08/15/2032 01-Aug-1999 .79,737.12
PD .87.12
LONG TERM OPER-PIMCO
-131,994.14 GNMA 11 POOL 8080088M 01-Aug-1999 131,994.14
36225CC20 6.875%06/20/2027 DD 06101/ 01-Aug-1999 -134,881.51
PD -2,887.37
LONG TERM OPER-PIMCO
-131,994.14 GNMA 11 POOL 8080088M 01-Aug-1999 131,994.14
36225CC20 6.875%0620/2027 DO 06/01/ 01-Aug-1999 0.00
PC 20-Aug-1999 0.00
LONG TERM OPER-PIMCO
-13,481.54 FIFTH THIRD BK.AUTO TR 96A C 15-Aug-1999 13,481.54
31677EAA4 6.200%09/01/2001 DO 03/1519 15-Aug-1999 .13,481.54
PD 0.00
LONG TERM OPER-PIMCO
-13,481.54 FIFTH THIRD BK AUTO TR%A C 15-Aug-1999 13.481.54
31677EAA4 6.200%09/01/2001 DO 03/1519 15-Aug-1999 0.00
PC 16-Aug-1999 0.00
MATURITIES
07-Sep-1999 16::01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE.. •41
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOL/DATED
SHARESIPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPL DATE GAIN/LOSS
CASH&CASH EQUIVALENTS
LONG TERM OPER-PIMCO
-1,200,000.00 COCA COLA CO DISC 03-Aug4999 1,195,296.67
19121EV34 0&103/1999 03-Aug-1999 -1,195,296.67
MT 03-Aug-1999 0.00
LONG TERM OPER-PIMCO
400,000.00 AMERICAN TEL&TL DISC 09-Aug-1999 399,214.45
03018BV97 08/09/1999 09-Aug-1999 -399,214.45
MT 09-Aug-1999 0.00
LONG TERM OPER-PIMCO
-9,400,000.00 EMERSON ELEC CO DISC 09-Aug-1999 9,391,979.67
29101DV96 08/09/1999 09-Aug-1999 -9,391,979.67
MT 09-Aug-1999 0.00
LONG TERM OPER-PIMCO
-3,000,000.00 PROCTER&GAMBLE DISC 09-Aug-1999 2,987,433.44
74271SV93 08/09119" 09-Aug-1999 -2,987,433.44
MT 09-Aug-1999 0.00
LONG TERM OPER-PIMCO
-10.200,000.00 IBM DISC 18-Aug-1999 10,158,505.83
45920EVJ7 08/18/1999 18-Aug-1999 10,158,505.83
MT 18-Aug-1999 0.00
LONG TERM OPER-PIMCO
-13,100,000.00 GENERAL ELEC CAP DISC 23-Aug-1999 13,072,162.50
36959JVQ3 09/23119" 23-Aug-1999 -13,072,162.50
MT 23-Aug-1999 0.00
LIQUID OPER-PIMCO
-900,000.00 FEDERAL NATL MTG ASSN DISC N 24-Aug-1999 889,090.00
313588KV6 MAT 08/24/19" 24-Aug-1999 -889,080.00
MT 24-Aug-1999 0.00
07ST-1999 16:01:06 Eeecmiv Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 42
PORTFOLIO DETAIL
OcsG000l0000 01-AUG-1999 -31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LIQUID OPER-PIMCO
-900,00no GENERAL ELEC CAP DISC 25-Aug-1999 894,803.25
36959JVRI 08/25/1999 25-Aug-1999 -894,803.25
MT 25-Aug-1999 0.00
FIXED INCOME SECURITIES
LIQUID OPER-PIMCO
-150,000.00 CITICORP SUB CAP NT 01-Aug-1999 150,000.00
173034DQ9 9.750%08/01/1999 01-Aug-1999 -151,663.50
MT 01-Aug-1999 -1,663.50
LIQUID OPER-PIMCO
-3,300,000.00 U S TREASURY NOTES 31-Aug-1999 3,300,000.00
912827R20 06.875%08/31/1999 DO 09131/ 31-Aug-1999 -3,308,636.72
MT 31-Aug-1999 -8,636.72
CORPORATE ACTIONS
LONG TERM OPER-PIMCO
-793,974.67 CHASE MANHATTAN GRAN 95-B CL 16-Aug-1999 793,974.89
161614AE2 5.900%11/152001 DO 11/15/9 16-Aug-1999 0.00
FC 16-Aug-I999 0.00
LONG TERM OPER-PIMCO
-793,974.67 CHASE MANHATTAN GRAN 95-B CL 16-Aug-1999 793,974.89
161614AE2 5.9009/6 11/15/2001 DO 11/15/9 16-Aug-1999 -792,330.90
CAL 1,643.99
INTEREST
07Sep-/999 16.01:06 &ecuiiw Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: ,43
PORTFOLIO DETAIL
OCS000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHAREWPAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LIQUID OPER-PIMCO
0.00 BSDT-LATE MONEY DEP ACCT 02-Aug-1999 0.03
996087094 VAR RT DO 06/26/1997 01-Aug-1999 0.00
IT 02-Aug-1999 0.00
LONG TERM OPER-PIMCO
0.00 BSDT-LATE MONEY DEP ACCT 02-Aug-1999 7.99
996087094 VAR RT DO 06/26/1997 01-Aug-1999 0.00
IT 02-Aug-1999 0.00
LONG TERM OPER-PIMCO
8,500,000.00 U S TREASURY NOTES 02-Aug-1999 265,625.00
912827206 06.250%01/31/2002 DO 01/31/ 31-Jul-1999 oho
IT 02-Aug-1999 0.00
LIQUID OPER-PIMCO
150,000.00 CITICORP SUB CAP NT 02-Aug-1999 7,312.50
173034DQ9 9.750%08/01/1999 01-Aug-1999 0.00
IT 02-Aug-1999 0.00
LIQUID OPER-PIMCO
0.00 DREYFUS TREASURY CASH MGMT 02-Aug-1999 655.79
996085247 01-Aug-1999 0.00
IT 02-Aug-1999 0.00
LONG TERM OPER-PIMCO
1,000,000.00 HOUSEHOLD FIN MTN SR 800570 02-Aug-1999 13,005.42
441SIKZT4 FLTG RT 08/01/2001 DO 09/041 02-Aug4999 0.00
IT 02-Aug-1999 0.00
LONG TERM OPER-PIMCO
0.00 DREYFUS TREASURY CASH MGMT 02-Aug-1999 7,174.21
996035247 01-Aug-1999 0.00
IT 02-Aug-1999 0.00
074ep-1999 16.01:06 Executive Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 44
PORTFOLIO DETAIL
00000010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESMAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
1,200,000.00 COCA COLA CO DISC 03-Aug-1999 4,713.33
19121EV34 08/03/1999 03-Aug-1999 0.00
IT 03-Aug-1999 0.00
LONG TERM OPER-PIMCO
400,000.00 AMERICAN TEL&TL DISC 09-Aug4999 785.55
03Oi8BV97 09/09/1999 09-Aug-1999 0.00
IT 09-Aug-1999 0.00
LONG TERM OPER-PIMCO
9,400,000.00 EMERSON ELEC CO DISC 09-Aug-1999 8,021.33
29101DV96 08/09/1999 09-Aug-1999 0.00
IT 09-Aug-1999 0.00
LONG TERM OPER-PIMCO
3,000,000.00 PROCTER&GAMBLE DISC 09-Aug-1999 12,566.56
74271SV93 08/09/1999 09-Aug-1999 0.00
IT 09-Aug-1999 0.00
LONG TERM OPER-PIMCO
2,000,000.00 BANKERS TR NY CORP GLOBAL NT 1 I-Aug4999 26,066.67
066365DW4 FLTG RT 05/11/2003 DD 05111/ 11-Aug-1999 0.00
IT II-Aug-1999 0.00
LIQUID OPER-PIMCO
300,000.00 LEHMAN BROS HLDGS MTN TR 003 16-Aug-1999 12,225.00
52517PPQ8 8.150%05/152000DD 10/16M 15-Aug-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
5,000,000.00 LEHMAN BROS HLDGS MTN 000196 16-Aug-1999 166,250.00
52517PID4 6.650%11/OS/2000 DD 11/08/9 15-Aug-1999 0.00
IT 16-Aug-1999 0.00
07S¢p-1999 16:01:06 Executiw WoAknch
Q ORANGE COUNTY SANITATION DISTRICT PAGE. -45
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSO-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAINILOSS
LONG TERM OPER-PIMCO
9,000,000.00 PHILIP MORRIS COS NT 16-Aug4999 416,250.00
718154BB2 9.250%02/152000 15-Aug-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
3,000,000.00 SEARS ROEBUCK ACCEP CORP MTN 16-Aug-1999 99,450.00
91240QJAI 6.6300/007/09/2002 DO 07/09/9 15-Aug-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
5,000,000.00 U S TREASURY BONDS 16-Aug-1999 278.125.00
912810DE5 11.125%09115/2003 DO 07/05/ 15-Aug-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
14,700,000.00 CHASE MANHATTAN GRAN 95-B CL 16-Aug-1999 3,903.70
161614AE2 5.900%11/15/2001 DO 11/15/9 15-Aug-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
243,922.45 FHLMC GROUP SG5-0476 16-Aug-1999 59,085.89
3128DDQ55 7.000%02/012003 DO 02/01/ 01-Aug-1999 0.00
IT 16-Aug-I999 0.00
LONG TERM OPER-PIMCO
45,035.25 FHLMC MULTICL MTG P/C 1574 E 16-AugA999 3,932.71
3133T02D5 5.900°/h06/15/2017 01-Aug-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
96,582.00 FHLMC MULTICLASS CFF E3 A 16-Aug-1999 19,037.89
3133TCE95 6.324%08/152032 01-Jul-1999 0.00
IT 16-Aug-1999 0.00
07-Sep-1999 16:0/.:06 Execwiv Wo kbewh
Q ORANGE COUNTY SANITATION DISTRICT PAGE: 46
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANSCODE BROKER COMPLDATE GAINILOSS
LONG TERM OPER-PIMCO
3.50 FHLMC MULTICLASS CTF E3 A 16-Aug-1999 3.50
3133TCE95 6.324%08/15/2032 01-Jul-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
13,491.54 FIFTH THIRD BK AUTO TR 96A C 16-Aug-1999 657.94
31677EAA4 6.200%09/01/2001 DO 03/15/9 15-Aug-1999 0.00
IT 16-Aug-1999 0.00
LONG TERM OPER-PIMCO
11,581.02 FHLMC MULTICLASS CTF SER 162 17-Aug-1999 11,581.02
3133T17A4 6.000%11/15/2023 DO 11/01/9 01-Aug-1999 0.00
IT 17-Aug-1999 0.00
LONG TERM OPER-PIMCO
3,950,000.00 GENERAL MTRS ACCEP CORP NTS 18-Aug-1999 51,493.78
370425QV5 FLTG RT 09/18/2003 DO 08/17/ 18-Aug-1999 0.00
IT 18-Aug-1999 0.00
LONG TERM OPER-PIMCO
10,200,000A0 IBM DISC 18-Aug-1999 41,494.17
4592DEVJ7 08/18/1999 IS-Aug-1999 0.00
IT 18-Aug-1999 0.00
LIQUID OPER-PIMCO
1,000,000.00 FEDERAL HOME LN MTG CORP DEB 18-Aug-1999 4,292.64
3134A3RT5 FLTG RT 05/19/2000 DO 051191 18-Aug-1999 0.00
IT 18-Aug-1999 0.00
LONG TERM OPER-PIMCO
3,500,000.00 CHRYSLER FM MTN 20-Aug-1999 14,482.23
17120QESO FLTG RT 08/08/2002 DO 04/081 20-Aug-1999 0.00
IT 20-Aug-1999 0.00
07Sep-1999 16.01:06 EcecWiv¢Workbench
© ORANGE COUNTY SANITATION DISTRICT PAGE: ,47
PORTFOLIO DETAIL
OCsG00010p00 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARESMAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPL DATE GAIN/LOSS
LONG TERM OPER-PIMCO
57,560.55 GNMA 11 POOL 00080023 20-Aug-1999 9,014.59
36225CAZ9 7.000%12202026 DD 1210V 01-Aug-1999 0.00
IT 20-Aug-1999 0.00
LONGTERM OPER-PIMCO
131,994.14 ONMA 11 POOL 0080088M 20-Aug-1999 12,713.17
36225CC20 6.875%06/202027 DO 06101/ 01-Aug-1999 0.00
IT 20-Aug-1999 0.00
LIQUID OPER-PIMCO
900,000.00 FEDERAL NATL MTG ASSN DISC N 24-Aug-1999 10,92000
313588KV6 MAT OI24/1999 24-Aug-1999 0,00
IT 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
13,100,000.00 GENERAL ELEC CAP DISC 24-Aug-1999 27,83Z50
369591VQ3 0824/1999 23-Aug-1999 0.00
IT 24-Aug-1999 0.00
LONG TERM OPER-PIMCO
2,000,000.00 FHLMC MULTICLASS CTF TI I A6 25-Aug-1999 10,833.33
3133TDPV2 C500%0925/2018 25-1u1-1999 0.00
IT 25-Aug-1999 0.00
LIQUID OPER-PIMCO
900,000,00 GENERAL ELEC CAP DISC 25-Aug-1999 5.196.75
36959JVRI 0825/1999 25-Aug-1999 000
IT 25-Aug-I999 0.00
LONG TERM OPER-PIMCO
2,000,000.00 FORD MTR CR CO TERM ENHANCED 27-Aug-I999 26,306.27
345397SC8 FLTG RT 09272006 DO 0827/ 27-Aug-1999 0.00
IT 27-Aug-I999 0.00
O7.Sep1999 16:01:06 Fiecu w Workbench
Q ORANGE COUNTY SANITATION DISTRICT PAOE.. 48
PORTFOLIO DETAIL
OCSG00010000 01-AUG-1999-31-AUG-1999
OCSD-CONSOLIDATED
SHARES/PAR TRADE DATE/ AMOUNT/
SECURITY ID TRANSACTION DESCRIPTION/ SETTL DATE/ COST/
TRANS CODE BROKER COMPLDATE GAIN/LOSS
LONG TERM OPER-PIMCO
5,500,000.00 U S TREASURY NOTES 31-Aug-1999 171,875.00
9128273G5 06.250%0 813 1/20 02 DO 09/02/ 31-Aug-1999 0.00
IT 31-Aug4999 0.00
LONG TERM OPER-PIMCO
5,000,000.00 U S TREASURY NOTES 31-Aug-1999 156,250.00
9128272L5 06.250%02/20002 DO 02/28/ 31-Aug-1999 0.00
IT 31-Aug-1999 0.00
LIQUID OPER-PIMCO
3,300,000.00 U S TREASURY NOTES 31-Aug-1999 113,437.50
912827R20 06.975%08/31/1999 DO 09131/ 31-Aug-1999 0.00
IT 31-Aug-1999 0.00
07-Sep-1999 16:01:06 Emullm Wyk
may.
FAHR COMMITTEE MeebngDa� I Toad.
09/08/99 Ds/m99
AGENDA REPORT Number I Mbyj
Orange County Sanitation District
FROM: Gary Streed, Director of Finance
Originator: Steve Kozak, Financial Manager
SUBJECT: QUARTERLY INVESTMENT MANAGEMENT PROGRAM
REPORT FOR THE PERIOD APRIL 1, 1999 THROUGH
JUNE 30, 1999
GENERAL MANAGER'S RECOMMENDATION
Receive and file the Quarterly Investment Management Program Report for the
period April 1, 1999 through June 30, 1999.
SUMMARY
Section 15.0 of the District's Investment Policy includes monthly and quarterly
reporting requirements for the District's two investment portfolios. These two
funds, the "Liquid Operating Monies," and the "Long-Term Operating Monies,"
are managed by PIMCO, the District's external money manager.
The ongoing monitoring of the District's investment program by staff and Callan
Associates, the District's independent investment advisor, indicates that the
District's investments are in compliance with the District's adopted Investment
Policy and the California Government Code, and that overall performance has
tracked with benchmark indices. In addition, sufficient funds are available for the
District to meet its operating expenditure requirements for the next six months.
The District's portfolios do not include any reverse repurchase agreements or
derivative securities.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGETIMPACT
❑ This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
H:Mp. �10Wou4WUNxylmMgmlRepN&9l dx
w.u.e_ „� Page 1
ADDITIONAL INFORMATION
Performance Reports
The Quarterly Strategy Review, prepared by PIMCO, and the Investment
Measurement Quarterly Review, prepared by Callan Associates, are attached for
reference. Also attached are four comparative bar charts which depict the sector
diversification and credit quality of the District's portfolios, as of March 31, 1999,
and June 30, 1999. The Liquid Operating Monies portfolio, with an average
maturity of 90 days, consists entirely of cash equivalent investments such as
U.S. Treasuries and corporate discount notes.
Portfolio Performance Summary
The following table presents a performance summary of the District's portfolios
as compared to their benchmarks for the period April 1 through June 30, 1999.
Portfolio Performance Summary
Quarter Ended June 30.1999
Liquid Operating Monies
°at) Long-Term Operating Monies(%)
Total Rate Total Rate o
of Return Benchmark(' Return Benchmark"'
3 Months 1.2 1.1 0.1 0.2
fi Months 2.3 2.2 0.5 0.6
9 Months 3.7 3.4 1.1 1.2
12 Months 5.2 4.7 5.0 4.9
Since inception 30 Sept 95 5.5 5.1 GA 6.1
Market Value per PIMCO 30 June 99 $19.0M $305.9M
Average Quality "AA.- "AAA"
Covent Yield(%) 5.26 6.21%
Estimated Yield to Maturity(%) 5.32 5.90
uarterty Deposits(WN,tlrawals)
Estimated Annual Income $1.om lilaom
(1) Benchmarks:
• Liquid Operating Portfolio: 3-Month Treasury Bill Index
• Long-Term Operating Portfolio: Merrill Lynch Corp/Govt 1-5 Year Bond Index
Market Recap
Interest rates rose sharply during the second quarter of 1999 as continued rapid
growth in the U.S. economy, and signs of recovery in overseas markets,
heightened concern that the Federal Reserve would boost interest rates to
prevent a resurgence in inflation.
A I". BVmg1c..,. Q..r lylmM9MrRep 9A9 dx
R--d 11566 Page 2
On the last day of the quarter, the Fed raised the federal funds rate 25 basis
points, from 4.75% to 5.00%, in a pre-emptive move to control inflation. Rising
interest rates created an unfavorable setting for bonds in the second quarter,
affecting all fixed income market sectors.
Rates rose across the entire Treasury yield curve, driven largely by the belief of
investors that the Fed would raise interest rates. As depicted in the attached
comparative graph of the Historical Yield Curve, the yield on the 30-year
Treasury benchmark jumped 34 basis points when compared to the end of the
first quarter 1999 (5.62%), ending the second quarter at 5.96%. Yields on 10-
year Treasury bonds ended the quarter at 5.78%, a climb of 56 basis points from
the end of the first quarter (5.23%).
Shorter rates showed similar significant increases. The 3-month Treasury rate
increased by 31 basis points (from 4.46%to 4.77%); the 6-month rate jumped a
full 51 basis points (from 4.52 % to 5.03%); and the 1-year rate rose 36 basis
points (from 4.70%to 5.06%).
For the Long-Tenn Operating Monies portfolio, PIMCO maintained a weighted
maturity or duration slightly above the duration index (2.4 vs. 2.3 years),
emphasizing holdings in mortgage-backed bonds, investment grade corporate
notes, and U.S. Agency securities. The performance of the portfolio lagged its
benchmark by ten basis points for the second quarter(0.10%vs. 0.20%).
Generally, the slight under-performance of the Long-Term portfolio in the short-
tern was due to: First, the above-index duration maintained by PIMCO, which
detracted from returns on the margin as yields rose, especially in June. Since
bond prices and yields move in opposite directions, bond prices fell as yields
rose. In June, the price decline was greater than the income earned on the
bonds, and total return declined for the quarter. Second, PIMCO's emphasis on
mortgage and corporate holdings, as these investment sectors under-performed
the index during the month of June. In the long-term, by comparison, PIMCO
has outperformed the index by 29 basis points on an annualized basis since
inception of the investment program in September 1995.
For the Liquid Operating Monies portfolio, PIMCO used a duration posture
slightly above index (approximately 130 days vs. 90 days), emphasizing slightly
longer short-term U.S. Agency discount notes and high-quality corporate
commercial paper than the index. This added returns to the portfolio, which
slightly outperformed its benchmark (1.2%vs. 1.1%) for the second quarter.
Market Outlook
Forecasts from PIMCO report that economic expansion will continue, though at a
slower pace, as higher interest rates begin to slow consumer and investment
spending. Moderating growth and relatively low inflation will keep interest rates
near their current levels over the coming months, making yield more important
than price movement in determining portfolio returns.
x w.auwna,w�,.,a�n-n� �w�,%osmc
Page 3
The PIMCO investment strategy targets portfolio duration slightly above index to
take advantage of higher yields provided by longer maturity securities. PIMCO
indicates that they will emphasize short maturity holdings in investment-grade
corporates and adjustable rate mortgage securities, and longer maturity holdings
in U.S. Agency debentures and high-quality asset backed and mortgage backed
securities.
The attached letter from PIMCO provides a more detailed description of second
quarter market conditions, portfolio returns, future market outlook, and their
recommended investment strategy for the District's Long-Term Operating Monies
portfolio.
Portfolio Market Values
Comparative marked-to-market quarter-end portfolio values are shown in the
table below, and in the attached bar chart.
Liquid Long-Tarn
Quarter Operating Operating
Ending Monies($M) Monies(9M)
30 June 98 18.1 311.5
30 Sept.98 18.4 282.8
31 Dec.98 18.6 304.5
L31 rd1 Ma99 18.8 305.8
30 June 99 19.0 305.9
ALTERNATIVES
N/A
CEQA FINDINGS
N/A
ATTACHMENTS
1. PIMCO Report
2. Callan Report
3. Quarter End Portfolio Market Value Bar Chart
4. Four Comparative Bar Charts
5. Historical Yield Curve Graph
6. PIMCO Letter dated August 26, 1999
SVK:Ic
H:bn��1PlmehlpueepRybrvM�mlaepv1493.Eec
aewee: 1� Page 4
Prepared by Finance,8117199, 3:07 PM
OCSD Investment Management Program
Quarter End Portfolio Values
(Marked-to-Market)
$350,000,000
$300,000,000
$250,000,000 iii -- " " iii - iii -
... iii ... ♦.♦ ♦.♦
iii iii iii
$200,000,000 iii iii - iii - - iii iii
iii iii ••• ♦•♦ ♦•♦
♦.
... ♦.♦ ..♦ ♦ ♦.♦
$150,000,000 ��� +�� iii - ��i iii
iii iii ••• ��• ���
$100,000,000 **+ iii
iii iii ... •.• •.•
$50,000,000 iii i.i iii - -----
$0
30 Jun 98 30 Sep 98 31 Dec 98 31 Mar 99 30 Jun 99
10 Liquid Operating Monies ® Long-Term Operating Monies
G:\excel.dta\fin\2220\geggi\FinanceVnvestmgmtprogram
Prepared by Finanoe, 8/17/99, 2:53 PM
OCSD Liquid
Operating Monies Portfolio
100 Investment Diversification 100100 .
90
80
,^ 70
60 O 3/31/99
a 50 ® 6/30/99
40
a 30
20
10
0 0 0 0 0 0 0 0 0 0
0
Govt Mtg Corp Non US$ Other Net Cash
Equivalent
G:\excel.dta\fin\22201geggi\FinanceWortfolio short term
Prepared by Finance, 8/17/99, 2:52 PM
OCSD Long-Term
Operating Monies Portfolio
Investment Diversification
100
90
80
70
605454
❑ 3/31/99
50 ® 6/30/99
40
a 30 2s
20 11
10 a
00 00
0
Govt Mtg Corp Non US$ Other Net Cash
Equivalent
G:lexcel.dla\fin\2220\geggilFinancelPortfolio long term graph
Prepared by Finance, 8/26/99, 10:17 AM
OCSD Liquid
Operating Monies Portfolio
Investment Credit Quality
100
90
80
70
60
.. ❑ 3/31/99
50 43 ® 6/30/99
a40 32 39
30 21 22
20
10 3 3
0
A1/P1 AAA AA A
G:\excel.Cla\M\2220\geggi\Finance\Portfolio short term
e'^r .
Prepared by Finance, 8/26/99. 10:17 AM
OCSD Long-Term
Operating Monies Portfolio
Investment Credit Quality
100
90
80 74
70
70
60 ❑ 3/31/99
50 ® 6/30/99
ate`) 40
a 30
20 19 20
10 8
2 2
0
A1/P1 AAA AA A
G:texcel.dta\flnt22201geggi\FinancetPortfolio long term graph
Prepared by Finance, 8/5/99, 8:54 AM
HISTORICAL YIELD CURVE
6.50
6.25
6.00
5.75
5.50
9 5.25
5.00
4.76
4.50
4.25
4.00
E E 5 S 5 5 5 S 5 5
ea of
t31-De�98 6 31-Mar-99 t3Jun-99
G:\exoel.dlaVin122201geggAFlnance91ls1orimiTREASURYyleldcume
r PACIFIC INVESTMENT MANAGEMENT COMPANY
840 Newton,Curler Drive
Post Colo.Boa W 30
Newport Beach
August 26, 1999 Calihvn4936i9.6a30
949 • 640.3031
Fax • 919 • 720-1376
Mr.Gary Streed
Director of Finance
Orange County Sanitation District
108"Ellis Avenue
Fountain Valley,CA 92728-8127
Dear Gary:
I would like to take this opportunity to review events in the bond market during the second
quarter and to describe the investment strategy that PIMCO utilized on behalf of the Sanitation
District during the period. Finally,I would like to describe PIMCO's current economic outlook
and the manner in which our economic outlook,combined with relative value opportunities in the
bond market, lead to our investment strategy going forward.
Bond Market Review:
Concern that the continued health of the U.S.domestic economy would spark inflation and lead
the Federal Reserve Board to tighten monetary policy caused interest rates to rise all across the
maturity spectrum during the second quarter. U.S. interest rates rose by an average forty basis
points in three-month to one-year Treasury bills. Rates rose by an average fifty-three basis points
in two-year to ten-year Treasury notes. Rates rose by thirty-four basis points in the longest
maturity thirty-year Treasury bond to end the period at 5.96 percent.
Not surprisingly,given the dramatic rise in interest rates,the bond market turned in relatively
poor performance over the period. The Merrill Lynch Govemment(Corporate bond index,the
index against which PIMCO is measured for the Sanitation District's long-term portfolio,
returned 0.22 percent for the quarter. (The 0.22 percent total return is the sum of the price return
on the bonds in the index and the coupon return of the bonds in the index.) The increase in
yields,which occurred over the period,led to a negative price return for the index of-1.269
percent. The coupon income of 1.497 percent for the index offset the price losses and led to the
0.22 percent total return for the period.
As you recall,the Merrill index is made up of all existing Treasury bonds with maturities between
one and five years,all agencies bonds with maturities between one and five years,and all
investment-grade corporate bonds of the same maturities. The index is created on a market-value
weighted basis so that Treasuries represent sixty-one percent of the index,agencies represent
approximately fifteen percent of the index,and corporate bonds represent twenty-four percent of
the index. Returns vary by security type. In the second quarter,for example,the total return of
the Treasury component of the index was 0.26 percent return. The total return of the agency and
corporate component of the index were 0.31 and 0.15 percent,respectively.
Pacific Investment Management Company is a general partnership whose partners are PIMCO Management Inc.and PIMCQ Advisors LY
Mr.Gary Streed
Orange County Sanitation District
August 26, 1999
Page Two
OCSD's Second Ouarter Return:
As an active bond manager,PIMCO has three weapons within its strategic arsenal. The first
strategy,duration, is the price sensitivity of the portfolio to changes in interest rates. Because
price and yield changes move in opposite directions,we would choose to have an above-index
duration posture if we forecasted a decline in interest rates. Likewise,we would choose to have a
below-index duration posture if we forecasted an increase in interest rates. (Our duration strategy
in the OCSD-Long term portfolio is limited to+/- .45 years around the index.) The second
strategy,curve or maturity mix, involves investing more heavily in that segment of the yield
curve that is expected to outperform. If,for example,PIMCO's outlook called for interest rates
to decline more extensively in two-to-five year maturities than in other segments of the yield
curve,we would invest more heavily in the intermediate segment of the curve. The final
strategy,sector/issue selection,involves overweighting or underweighting a sector of the bond
market. If,for example, PIMCO expected investment-grade corporates to outperform Treasuries,
we would overweight the corporate sector. The extent of our overweight or underweight is
limited by our desire to preclude any single strategy from significantly impacting return in the
event that our outlook is wrong.
During the second quarter,PIMCO's strategy for the OCSD Long-Term portfolio was to have a
slightly longer-than-index duration posture in expectation of a modest decline in yields. Our
duration was never more than 0.15 years above the duration of the index so that the cost of this
strategy in terms of performance was less than five basis points. Our curve strategy was to have a
broader-than-index exposure to maturities across the yield curve. This posture was modestly
positive as rates rose the most in one to five year maturities. Finally,our sector strategy was to
have greater-than-index exposure to agency debentures,corporate bonds and mortgage securities.
For example,we held sixteen percent in agency securities rather than the fifteen percent
represented in the index. We also held thirty-two percent in corporates securities as opposed to
the twenty-four percent represented in the index. Finally,we held eighteen percent of mortgage
securities that have no weighting in the Merrill 1-5 government/corporate index. While our
decision to overweight agency securities proved positive,our sector strategy detracted from
performance overall. The yield advantage to Treasuries available through corporates and
mortgages failed to offset the price losses on these securities as credit spreads widened slightly
over the period. The net result of our strategies over the quarter was to achieve a A percent total
return underperforming the index by A percent. Clearly,while we strive to outperform the index
every quarter,our true value is longer-term in nature. Since inception of our relationship,PIMCO
has outperformed the index by 29 basis points on an annualized basis.
Outlook andSdaleev:
During our secular forum that occurred in May, PIMCO shifted our long-term outlook to neutral
from our previous bullish stance and expect 30-year Treasury yields to remain within a 5 percent
to 6.5 percent band over the next three years. Inflation will remain new 2 percent.
PACIFIC INVESTMENT MANAGEMENT COMPANY
,j
Mr. Gary Streed
Orange County Sanitation District
August 26, 1999
Page Three
Outlook and StrateEV: (Continued)
The 17-year bull market in bonds, during which Treasury yields plunged from more than 15
percent in 1981 to below 5 percent last year, occurred within an environment of economic
growth, rising productivity and disinflation driven by the spread of capitalism worldwide. There
are now fewer countries left to embrace capitalism, and we do not see other major economic,
political or social trends that will drive rates much below the bottom of our secular range.
Meanwhile, disinflationary, forces such as global excess capacity and productivity enhancements
created by new technologies will limit rate increases. Our range-bound interest rate forecast is
based on the view that forces of deflation and inflation are roughly in balance:
• The global economy is safer than last year,when weak Asian economies,currency
devaluations and falling commodity prices raised the specter of global deflation.
• Fiscal stimulus and more than 300 separate central bank emings calmed financial markets and
produced signs of recovery in Japan and several Pacific Rim countries.
• Global reflation is unlikely due to excess supply and structural impediments to growth in
Europe and Japan.
• Inflexible labor markets in Europe will prevent assimilation of growth-producing new
technologies,while Japan's high savings rates will frustrate fiscal and monetary stimulus.
• The direction and momentum of the U.S.stock market will strongly influence our forecast. If
recent gains in stocks continue,enhanced consumer confidence will lead to faster growth. A
stronger economy would induce the Fed to tighten and push interest rates toward the top of
our range.
Economic expansion will continue,though at a slower pace,as higher interest rates reduce growth
in consumer and investment spending. While the Fed may tighten further to help cool the
economy, the central bank will not embark on a protracted series of rate hikes such as last
occurred in 1994. Compared to 1994, real interest rates are higher, inflation is lower and recent
monetary stimulus has been less substantial. Inflation will trend upward due to a leveling off of
commodity prices after recent declines, but global excess capacity and technology-driven
productivity gains will limit these increases.
Moderating growth and relatively low inflation will keep interest rates near current levels over the
next few months, making yield more important than price movement in determining portfolio
returns. Prudent alternatives for generating extra yield include: premiums from written options;
securities with embedded options such as mortgages;and higher-quality below-investment grade
PACIFIC INVESTMENT MANAGEMENT COMPANY
j
Mr.Gary Streed
Orange County Sanitation District
August 26, 1999
Page Four
Outlook and Stratepy: (Continued)
and emerging market bonds. (We do not use options, below investment-grade securities or
emerging market bonds in the OCSD portfolios.)
In terms of the OCSD Long-Term portfolio, we will embark upon a slightly greater-than-index
duration posture as opportunities allow. Recent rate moves have pushed yields to near to the top
of our secular range. The duration extension will be extremely modest as we anticipate only a
modest decline in yields. In terms of our curve strategy,we will maintain our broader-than-index
posture as this allows us to minimize exposure to the segment of the curve most impacted by
changes in monetary policy. In terms of sector, we will maintain our weighting to the mortgage
sector anticipating that the yield enhancement available through these securities will allow us to
add to total portfolio return. We will add to short-maturity corporate holdings to take advantage
of the yield enhancement potential available in these bonds while avoiding significant price
deterioration in the event that corporate spreads widen further. Our minimal overweight of
agency debentures will also be maintained given their narrow yield advantage to Treasuries.
Gary, I hope this information proves useful. I look forward to chatting with you in the near
future.
Sincerely,
2
Rita J. Seymour
Vice President
RJS:ci
Copy: Steve Kozak
Joseph Fournier
PACIFIC INVESTMENT MANAGEMENT COMPANY
FAHR COMMITTEE M ngDate TO ad.ofDir.
09/08/99 09/22/99
AGENDA REPORT IDem Number Ihm NumOer
FMR99-68 14(e1
Orange County Sanitation District
FROM: Gary G. Streed, Director of Finance
Prepared by: Michael D. White, Controller
SUBJECT: COMPLETION OF J. D. EDWARDS FINANCIAL INFORMATION
SYSTEM IMPLEMENTATION
GENERAL MANAGER'S RECOMMENDATION
Accept Purchase of New Financial Information System (Specification No. P-172) as
complete.
SUMMARY
Staff has implemented the following applications from the J. D. Edwards World classic
proprietary software: general ledger, accounts payable, accounts receivable and cash
receipts, fixed assets, job cost, budgeting, payroll, human resources, purchasing,
inventory and warehousing, sales order, and address book. All of the functionality
required of these applications as specified within the original request for proposals has
been provided. After further analysis of the software, the contract management
application was not implemented due to the relatively low value of benefits expected to
be received. Implementation costs to date are within the original contract award to J. D.
Edwards, IBM, and Enterprise Technologies of$1.485 million.
Migration to the J. D. Edwards OneWorld client/server software has not been
completed. To date, approximately $152,000 has been incurred in Enterprise
Technology consulting services for OneWorld migration out of a total budget of
$163,000 with few productive benefits being obtained. These costs are primarily due to
addressing OneWorld software shortcomings and are amounts paid to Enterprise
Technology while attempting to make the software operational.
PROJECT/CONTRACT COST SUMMARY
Total Board approval for the purchase of the hardware, software and implementation of
the financial information system through IBM, J. D. Edwards, and Enterprise
Technology was $1,485,000. No additional funds are being requested with this action.
BUDGETIMPACT
® This item has been budgeted.
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
N:ewau`pwr\mMa Her Rgws\loweab Aperq n.pau`uroaanmi INq.aec
R~ 1�7 Page 1
ADDITIONAL INFORMATION
At the July 24, 1996 meeting, the Joint Board of Directors authorized the General t
Manager to execute a contract for a new financial information system with
J. D. Edwards and approved the purchase of the hardware from the California Multiple
Awards Schedule (CMAS)for a combined amount not to exceed $1,485,000.
At the February 11, 1998 FAHR Committee Meeting, the Committee approved the
assignment of the implementation portion of the financial information system contract for
the remaining software applications consisting of fixed assets, contract management,
and inventory management, and for the conversion to the J. D. Edwards OneWorld
operating platform to Enterprise Technologies, because J. D. Edwards could no longer
provide a local client implementation project manager and implementation team. This
assignment was made without increasing the original $1,485,000 approved by the
Board for the purchase of the hardware, software, and implementation of the financial
information system through IBM and J. D. Edwards. To date, hardware, software, and
implementation costs have totaled $1,479,000.
Implementation of the various applications were completed as follows:
Projected
Completion Date Actual
Phase Applications As of October 1996 Completion Date
Phase I Payroll/H.R. Benefits January 1, 1997 January 3, 1997
Budgeting February 1, 1997 February 1, 1997
Phase II General Ledger July 1, 1997 July 1, 1997
Accounts Payable "
Cash Receipts/Acccunts Receivable "
Fixed Assets February 1, 1998
Phase III Purchasing September 30, 1997 November 1, 1997
Inventory Management-Phase I-Admin. "
Inventory Management-Phase II-08M Not Originally Identified March 1, 1998
Job Cost July 1, 1997
Contract Management Not Completed
Phase IV One World Conversion/Migration June 30, 1998 Not Completed
The assignment of the implementation services to Enterprise Technologies resulted in a
consulting service agreement with Enterprise Technologies, for time and materials, in
an amount not to exceed $276,000 that expired on August 1, 1999. Through July 31,
$274,383 had been expended against this service agreement, as follows:
v+.mw�aMmso,m nvam aamm++vsa s"ab�ve.aa aev�'oaeahem+afel aoc
Page 2
' Enterprise Technologies Estimated Project Costs Incurred
Budget Budget To Date
World Installation:
Inventory $ 3,000 $ 5,500
Purchasing 10.375 15,875
Sales Order 23,000 28,198
Fixed Assets 14,000 16,388
Contract Management 10,000
GUAR/AP Support 4.000 15.015
Project Management 18,520 29,890
Data Conversion 11,719 11,800
Project Contingency 19,000
Total World 113,614 122,666
OneWorld Installation:
Specific Consulting123,543 151,717
Project Contingency 39,500
Total OneWorid 163,043 151 717
Grand Total $276,657 $274,383
Implementation of the Contract Management module was not completed because the
functionality of the J. D. Edwards World system was developed to meet the needs of the
private sector. The module lacked the functionality to properly monitor contracts in
accordance with the purchasing requirements of the State of California Government and
Public Contract Codes, as well as the District's internal purchasing policies. Instead,
Purchasing staff has developed a computer program within Microsoft Access that
monitors contracts, insurance, and procurement bond requirements with internal
resources.
Migration to the J. D. Edwards OneWorld client/server software has not been completed
because the software has not matured to the paint that it can be installed efficiently
while retaining all of the functionality currently available in the installed World classic
software applications. To date, approximately$152,000 has been incurred in Enterprise
Technology consulting services for OneWorld migration, out of a total budget of
$163,000, with only the OneWorld Accounts Receivable module being placed into
production. These costs are primarily due to addressing OneWorld software
shortcomings and are amounts paid to Enterprise Technology for attempting to make
the software operational.
In our agreement with J. D. Edwards, we purchased the World classic software, all of
the functionality required within our original request for proposal, and the right to migrate
to the OneWorld software. At the time we negotiated the software license agreement,
J. D. Edwards was making no assurances as to functionality of the OneWorld software.
Staff recommended J. D. Edwards because of their established World product, the cost
difference to the second proposal, and the urgent need to upgrade the District's
outmoded 1979 system. We advised the Board that no governmental OneWorld
Kb .ft,w NA Rq 11M Bo Age n.wa�ufel ac
R„ . 10 Page 3
installations were complete, and that there was some uncertainty about the ultimate
development of the project. Excerpts from the recommendation presentation are
attached.
Enterprise Technologies has submitted a proposal to complete the migration of the
Financial Suite of applications (General Ledger, Accounts Payable, Fixed Assets, Job
Cost, and Budget) to OneWorld at an estimated additional cost of$96,000. However,
this proposal is based on time and materials without any assurances that additional
funds won't be needed. No firm dollar estimate can be provided at this time for
completing the OneWorld Distribution Suite (Purchasing, Warehousing and Inventory,
and Sales Order) or the OneWorld Human Resource/Payroll Suite.
The benefits lost by not completing the migration to OneWorld include:
• The OneWorld software is more user-friendly, especially to those users outside of
the Finance Department. The OneWorld software resembles a Microsoft product
with its point and click, drop down menus, and graphical interface. The World
classic software requires IBM keyboard knowledge and the use of function keys.
• The OneWorld software provides the District with more alternatives when selecting a
hardware platform and an operating platform since the product virtually runs on any
hardware platform and will run on an Oracle operating system.
• Information within the OneWorld software can more easily be uploaded/downloaded
into Microsoft personal computer applications such as Excel and Access.
• The OneWorld Software is designed to support e-commerce and will ultimately
support web browser access. Ecommerce could provide us the opportunity to pay
our vendors electronically. A web browser access would allow employees to
complete timesheets on-line that would automatically feed into the payroll module.
• Ultimately, J. D. Edwards will be discontinuing support of the World classic software
and we may be forced to implement OneWorld or a whole new financial information
software package from another vendor.
ALTERNATIVES
1) Extend the consulting services agreement with Enterprise Technologies through
December 31, 1999, to complete the implementation of the OneWorld Financial
Suite applications for time and materials, in an amount not to exceed $96,000.
Direct staff to solicit additional consulting service proposals for the implementation of
the OneWorld Distribution Suite and Payroll/Human Resource Suite following the
completion of the OneWorld Financial Suite implementation.
2) Direct the Information Technology Department to continue to monitor the
development of the J. D. Edwards OneWorld software. At some time in the future
when the Information Technology Department believes that the software has
matured sufficiently to be implemented with few modifications, direct staff to solicit
proposals for implementation of the J. D. Edwards OneWorld software.
H:Vxp.tlGbpetlaWeN�Rmka Re,wLL11Ba3 PmE Igerda Re�atiWf/dJlem 1Rfe)E¢
ReAUJ_ 1� 7 Page 4
CEQA FINDINGS
N/A
ATTACHMENTS
Excerpts from FIS selection presentation to FAHR Committee
GGS:MWD:Ic
w�..pammw��.m r,w�Amaa�+we m.m noe�a.RepomNe»+bm iaPo)ao�
Page 5
+Mitting Vendors
♦ Bi-Tech (Chico, CA)
♦ JD Edwards (Denver, CO)
♦ Pentamation (Bethlehem, PA)
♦ PeopleSoft (Walnut Creek, CA)
♦ SCT (Lexington, KY)
• BiTech is a vendor going through a platform migration from
HP3000/Image to UNWInfonnix. Also going thru an acquisition.
Having problems adapting a higher ed product to local gov't—
particularly Orange County Transit.
• JD Edwards has the largest local gov't installed base of the five. A
long standing IBM/AS-400 product now moving to new Client/Server
version off of AS400.
• Pentamation has no West Coast offices, very casual marketing in
this area. Did not aggressively pursue this account, possibly a
timing issue, possibly strategic.
• PeopleSoft is a fast growing Human Resource system specialist
with a relatively new Financial system product suite. They have a
large number of commercial (private sector) installations, but are
just beginning to penetrate the local government market with no
currently operating Califomia sites.
• SCT is a consulting company, systems integrator, and software
developer with a long history in college/university but with a
checkered history in local government. It is an Oracle-based
product but targets mostly small to medium accounts.
d
unary: JD Edwards
♦ IBM AS/400 based solution called `World
Vision'
♦ Offered to migrate to their new Client/Server
version called `One World'
♦ Good references, high `RESPONSIBILIT'Y' score
♦ Conservative on contractual issues
♦ Carefully studied CSDOC prior to submitting
proposal
• The IBM AS/400 is the largest installed midrange system in the
world
• Because AS/400 is considered by most to be a proprietary platform,
they have decided to move to an open-system, client/server version
of their product called One World.
• The question is whether they can tranfer all of their well-developed
functional knowledge to a new platform and what the impact of
trying to support a huge installed base on the legacy AS/400
platform while migrating the product to an new platform and
replicating all of the mature AS/400 features.
• Their legal conservatism will mean tough contract negotiations
because they do not want to commit to specific contract
deliverables.
3
+hical Comparison
s
� NM•YI,1� 1 --
V
•
Flexibility
The ME and PeopleSoft potential solutions are both speculative at
this point.
Properly implemented, PS could surpass JDE in functionality, but it
would depend on CSDOC's level of effort and commitment of
resources.
2D
FAHR COMMITTEE Meetln9Dal, T0081 1Dir.
o9/oe/99 o9/zz/99
AGENDA REPORT Item Number Item Number
FAHR99-69 14(n
Orange County Sanitation District
FROM: Gary G. Streed, Director of Finance
SUBJECT: 401(a) PENSION PLAN MAXIMUM CONTRIBUTION
GENERAL MANAGER'S RECOMMENDATION
Adopt Resolution No. OCSD 99-17, Amending District's Executive Money Purchase
Pension Plan and Trust.
SUMMARY
Effective January 1, 1998, the Board of Directors has approved an "Executive's Money
Purchase Pension Plan and Trust," more commonly called a 401(a) Plan. The only
executive who is eligible to participate in this plan is the General Manager, Don
McIntyre. All amounts deposited into this plan are offset by an equal reduction of the
General Manager's salary.
The Internal Revenue Code has established limits for financial participation in these
plans. In this case, the maximum participation is established by the IRC as $30,000 per
calendar year. The IRC also requires the amount of participation to be expressed as a
percentage of"Participant's Compensation for the Plan Year."
Because the plan was finalized well into 1998, and because the General Manager had a
specific participation level in mind, the participation percentage was established at
7.55% for 1998. Now that the General Manager's performance review for 1999 has
been completed, and his 1999 compensation can be determined, it is appropriate to
revise the participation percentage in order to allow the maximum participation.
The attached resolution, prepared by General Counsel, modifies the participation
percentage to reflect the request of the General Manager. Participation amounts are
offset by equal reductions in the salary of the General Manager.
PROJECT/CONTRACT COST SUMMARY
BUDGETIMPACT
® This item has been budgeted. tine hem: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
KM ftWeen"P Hie R"y IMB mApe ReparLLMY'8. Am I'M Ex
Reeae, y Page 1
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
Do not approve the change.
CEQA FINDINGS
N/A
ATTACHMENTS
1. Resolution No. 99-17
GGS:Ic
N,.v ao�c•b•ao,m�w�+v.w-+"we m,m.wro+A.oaswwmm,.m�
Page 2
L
V
RESOLUTION NO. OCSD 99-17
AMENDING DISTRICT'S EXECUTIVE MONEY PURCHASE PENSION
PLAN AND TRUST
A RESOLUTION OF THE BOARD OF DIRECTORS OF ORANGE
COUNTY SANITATION DISTRICT AMENDING THE DISTRICT'S
EXECUTIVE MONEY PURCHASE PENSION PLAN AND TRUST
WHEREAS, the Board of Directors of District, on October 29, 1998,
adopted an Executive Money Purchase Pension Plan and Trust, as authorized by
United States Internal Revenue Code Section 401(a); and
WHEREAS, Article 4, Section 4.1 of said Plan provides for the District, as
Employer, to contribute a fixed percentage of the Participating Employee's
compensation to the Plan; and
WHEREAS, District desires to change the percentage of its contribution
for the current Plan Year.
NOW, THEREFORE, the Board of Directors of Orange County Sanitation
District,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1: Section 41 of Article 4 of the District's Executive Money
Purchase Pension Plan and Trust is hereby amended to read:
'4.1 Employer Contributions—The Employer shall contribute 21.2% of
the Participant's Compensation for the Plan Year to the Plan. For this
purpose, 'Compensation' shall mean 'Compensation'as defined in
Section 2.6 hereof, provided, however, any elective deferrals (as defined
in Section 402(g)(3) of the Code), or amounts which are not includible in
the gross income of the Employee by reason of Section 125 or 457 of the
Code shall not be included in Compensation. Employer contributions
shall be paid to the Trustee following the end of the Plan Year for which
the contributions are made."
PASSED AND ADOPTED at a regular meeting held September 22, 1999.
Chair
ATTEST:
Board Secretary
FAHR COMMITTEE meenn9 Dare Ta B�Nm
9/B/999/AGENDA REPORT IMmNumWrFA' R9&70 1
Orange County Sanitation District
FROM: Mike Peterman, Director of Human Resources
SUBJECT: CONSULTANT AGREEMENT FOR FORMER EMPLOYEE,
GERALDJONES
GENERAL MANAGER'S RECOMMENDATION
Approve a Professional Services Agreement with Gerald Jones in the amount of
$67.50 per hour plus actual travel expenses, for a two-year period in an amount
not to exceed $123,500 per year.
SUMMARY
For several years, the District has been implementing programs aimed at
reinventing the way operations are managed. Gerald Jones has been a leader in
many critical areas of the reinvention effort including reconciliation of the
maintenance database with the asset and tagging information developed by the
Reinvention Automation Project, and the planning and scheduling interface with
the warehouse, purchasing, maintenance database and the financial database.
These projects are at the core of our reinvention efforts as they pertain to running
the plants at optimal efficiency. The District has completed one phase of the
reinvention program, but there are still at least two years to go until completion.
Mr. Jones has decided to retire and move to Las Vegas, however he is willing to
continue to work as a professional consultant to help us complete the reinvention
work. In Mr. Jones' proposal he would travel to the District every other week and
work a four-day workweek (a copy of his proposal is attached). He has proposed
an hourly rate of$67.50 plus actual travel expenses. Mr. Jones' current hourly
rate plus benefits is $53.85. It is essential that we maintain Mr. Jones'
involvement with the project to ensure the project's continuity and schedule are
maintained. The alternative would be to use outside consultants at a $140 hourly
rate.
This recommendation is being brought forward to the Finance and Human
Resources Committee because District policy prohibits hiring former employees
as consultants for a period of one year from the termination date (see attached
policy B80.5.2). However, the FAHR Committee on a case-by-case basis may
MM ..N enda�,d n0enaa Repv,4,1RW a 1a Hamm Reryb�14(y).dx
R—.ad dense Page 1
waive the prohibitions of this policy if it is determined to be in the District's best
interests (BS0.5.5).
PROJECTICONTRACT COST SUMMARY
Contract cost approximately$123,500 per year including expenses.
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
® This item has not been budgeted, but there are sufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
N/A
ALTERNATIVES
1. Use outside consultants at a $140 hourly rate.
2. Use existing staff to manage the project.
CEQA FINDINGS
N/A
ATTACHMENTS
Exhibits A and B
M\rq.UbYpMv M A,d.R.a 11. .I1.n Pe�'W .M U(11 d-
R. � Page 2
Ex4tEir A
r"
Orange County Policy Number: B80.00 -
Sanitation District Effective Date: October 22, 1997
Subject: EMPLOYMENT OF FORMER Supersedes:
EMPLOYEES
Approved by: LYt�Yr�
1.0 PURPOSE
1.1 The purpose of this policy is to establish uniform guidelines and procedures for
employing former employees.
2.0 ORGANIZATIONAL UNITS AFFECTED
2.1 This policy applies to all former employees.
3.0 DEFINITIONS
4.0 POLICY
4.1 It is the District's policy to employ former employees in accordance with the
procedures, provisions and conditions of this policy.
5.0 PROCEDURE
5.1 The General Manager may,with the written approval of the Joint Chairman,
employ on a part-time, as-needed basis, a retired staff member when such
person possesses knowledge and expertise of unique and particular benefit to
the Districts and when the services are required. The length of service
performed in any one year shall be limited in accordance with the provisions
prescribed by the Orange County Employees'Retirement System(currently 120-
day maximum).
5.1.1 Such part-time service shall be compensated at the same current hourly
rate of the retired employee's position classification,or if no such
classification exists,at a rate not to exceed that paid for the most
comparable classification. The refired employee shall not be entitled to
receive any benefits otherwise payable to the District employees. In the
event any employment under this provision involves work assignments
outside of Orange County,the current expense reimbursement policy
established for regular employees will apply.
Page 1
5.2 If any former employee commences doing business wherein the employee,
his/her spouse,or members of his/her immediate family are sole proprietors,or
majority or controlling shareholders or owners of a corporation, partnership or
other business entity,such business shall not be retained as an Independent
contractor or consultant to provide service directly to the Districts for a period of
one year after leaving Districts' employment. Thereafter,said business entity
shall be allowed to contract with the Districts upon compliance with all resolutions
and regulations of the Districts then in effect, relating to the procurement of
services.
5.3 If any former employee becomes employed by any firm or business entity in
which the former employee, his/her spouse or members of his/her immediate
family own less than the majority or controlling Interest in said entity,said entity
shall not be prohibited from contracting with the Districts. However,the former
employee shall not perform work on Districts'projects for a period of one year
after leaving Districts'employment; nor shall such former employee contact
Districts'officers or employees for the purpose of attempting to Influence any
Districts'decision, Including but not limited to,the award of contract,Issuance of
permits, or compromise of administrative civil penalties,for a like period of one
year. Said services shall be obtained only in accordance with all rules and
procedures of the Districts relating to procurement
5.4 Any Districts'employee who receives an offer of employment or a request to
discuss potential employment from any person or business entity performing
services for the Districts shall report such contact to his or her immediate
supervisor,who shall decide whether any change in assignment is necessary or
appropriate while the offer or discussions are pending.
5.5 The prohibkions of this policy may be waived by the Finance,Administration and
Human Resources Committee of the Boards of Directors it,on a case-by-case
basis, it is determined to be in the best Interests of the Districts to do so.
6.0 EXCEPTIONS
7.0 PROVISIONS AND CONDITIONS
8.0 RELATED DOCUMENTS
Page 2
August 23, 1999
mo
MEMORANDUM
TO: Bob Ooten
Director of Operations & Maintenance
FROM: Gerald Jones
O & M Maintena ce Manager
SUBJECT: Reinvention Project Work Items and Proposed Rates
Bob, I have reviewed reinvention work in progress and identified the following projects
that have goals and objects associated with them for fiscal year 1999-2000. The goals
and objectives have been assigned to the project specialists and supervisory staff in the
maintenance divisions. The goals and objectives are subject to change based on
schedule changes and have been provided as an attachment to this memorandum.
The reinvention projects are an out growth of the work that was completed last fiscal
year. A list of the projects follows:
♦ Reconciliation of the CMMS database with the asset and tagging information
developed by the Reinvention Automation Project (J-42).
• Task analysis on assets in the CMMS database (post reconciliation)
♦ Activity Code and Parts List development for. Identified equipment(post task
analysis).
• O&M support for equipment tagging project to be implemented through the
Reinvention Automation Project (procedures, methods and QA-QC for project).
♦ Planning & Scheduling and Warehouse & Purchasing business interface
development.
• Planning & Scheduling and CMMS & Financial Information System Integration
project (continued development).
• Expansion of existing Performance Measurement and Standards reporting.
The majority of the projects listed above are in some way dependent on the
Reinvention Automation Project schedule. It is also true that O&M support and
completion of reinvention work must also stay on schedule to accommodate the work
being performed by the Reinvention Automation Project. These interdependencies can
be discussed at your convenience.
OCSD a P.O.Boa 8127 a Fountain Valley,CA 927284127 a(714)962-2411
- � i
Page 2
August 23, 1999
Schedules and milestones for these projects can be provided as required to assist with
determining the resource requirements and the duration of each of the work efforts.
The schedules and task lists developed to date have been the basis of the attached
goals and objectives. I have assigned O&M resources to each of the projects. The
resources may have to be reallocated between the projects based on core business
and reinvention project priorities. I expect the reinvention process to be completed in
approximately three more years.
Additional resources will be required in specialty areas of the projects. I have identified
five areas that will require these resources.
♦ Mark Esquer will have to contribute some 0&M technical support staff time to
assist me with looking at the life cycle replacement program.
♦ Nick Arhontes will have to provide support for flow-charting and policy and
procedure development required to complete the equipment rebuild reinvention
process.
• O&M field personnel to perform task analysis and provide raw data and task
information for activity codes and parts lists development.
♦ Consultant Support for formalizing the policy and procedure for the new business
practices.
• Doug Stewart and the individual that replaces me as the O&M Maintenance
Manager must work together to insure that the Reinvention Automation Project
and the O&M Reinvention efforts stay on track.
The information in this memorandum provides a general overview of the work to be
completed. After reviewing the project management requirement and the resources
available (eight project specialists) for the project I believe it will take a minimum of half
time commitment on my part to effectively manage the process.
I would recommend a four day ten hour per day work schedule. The four-day schedule
would be Monday through Thursday. I would travel to the Orange County Sanitation
District plant sight every other week or as scheduled work activities require my
presence. This schedule is consistent with the project specialists assigned to the
project and will reduce my travel expenses.
I would charge an hourly rate of$67.50 for all on site and off site hours worked. This
rate would not include travel The travel expenses for the proposed four-day
workweek are approximate) $700.00 p r week.
U
Bob; if you need any additional information let me know.
Attachment
GRJ:jmf
H:1wp.dta\om1 60NonesW EMCS\RCMOOTEN.doc
C: Don McIntyre
Blake Anderson .
Maintenance Division Goals FY 1999-2000
Objective 1 Reconcile Instrumentation equipment and tagging information from the Reinvention Automation
Project (J-42) with CMMS Information for preliminary, primary and secondary treatment plant
processes. The reconciled CMMS databases must contain all equipment records for the process
area and have all records identified for deletion removed from the database (use defined
reconciliation procedures).
Measurement
Standards for
Meets Expectations: Complete the reconciliation of the CMMS database with the J-42 database for the
identified process areas and deliver the databases in a spreadsheet format to
Maintenance supervision by December 31, 1999.
Measurement
Standards for
Exceeds Expectations: Complete the reconciliation of the CMMS database with the J-42 database for the
Identified process areas and deliver the databases in a spreadsheet format to
Maintenance supervision by November 30,1999.
Resources needed: The assistance of the Asset Management Group #1 personnel and the CMMS Support
Group.
Objective 2 Reconcile instrumentation equipment and tagging information from the Reinvention Automation
Project(J42)with CMMS Information for digestion process areas at both plant facilities and the
effluent pumping process at plant 2. The reconciled CMMS databases must contain all
equipment records for the process area and have all records Identified for deletion removed
from the database(use defined reconciliation procedures).
Measurement
Standards for
Meets Expectations: Complete the reconciliation of the CMMS database with the J42 database for the
process areas which have been Identified and deliver the databases in a
spreadsheet format to Maintenance supervision by March 31,2000.
Measurement
Standards for
Exceeds Expectations: Complete the reconciliation of the CMMS database with the J42 database for the
identified process areas and deliver the databases in a spreadsheet format to
Maintenance supervision by February 28,2000. The reconciled CMMS databases
must contain all equipment records for the process area and have all records
Identified for deletion removed from the database (use defined reconciliation
procedures).
Resources needed: The assistance of the Asset Management Group #1 personnel and the CMMS Support
Group.
Continued
Section 5. Future Performance Objectives (Continued)
a
Objective 3 Reconcile instrumentation equipment and tagging Information from the Reinvention Automation
Project (J-42) with CMMS Information for the Central-Generation facilities and plant utilities at
both plant facilities.
Measurement
Standards for
Meets Expectations: Complete the reconciliation of the CMMS database with the J-42 database for the
identified process areas and deliver the databases In a spreadsheet format to
Maintenance supervision by June 30,2000,
Measurement
Standards for
Exceeds Expectations: Complete the reconciliation of the CMMS database with the J42 database for the
identified process areas and deliver the databases in.a spreadsheet format to
Maintenance supervision by May 31,2000.
Resources needed: The assistance of the Asset Management Group #1 personnel and the CMMS Support
Group.
Objective 4 Provide QAIQC for the Equipment Tagging Project associated with the Reinvention Automation
Project. Duties will Include verification of the installation of tags for the equipment in each
process area of the plant facilities.
Measurement
Standards for
Meets Expectations: Complete the OA/QC of the Instrumentation equipment for each of the plant
process areas within 45 days after the last tags have been Installed. To verify
QAIQC has been completed provide a spreadsheet that Identifies-the process
area equipment and the date the field Installation of the tags was verified.
Measurement
Standards for
Exceeds Expectations: Complete the QAIQC of the instrumentation equipment for each of the plant
process areas within 15 days after the last tags have been Installed. To verify
CA/QC has been completed provide a spreadsheet that identifies the process
area equipment and the date the field Installation of the tags was verified.
Resources needed: The assistance with project oversight by Dale Brooks and the other members of the
Asset Management Group#1.
Continued
-Objective 5 Working with the Planning & Scheduling and Warehouse& Purchasing Users Group expand the f
existing project plan to define the tasks required and approach to be taken to reclassify
inventory,standardize nomenclature and determine where equipment and parts cross-
referencing information should reside. 4
Measurement
Standards for
Meets Expectations: Complete the task definition and the approach to be taken to reclassify
inventory, standardize nomenclature and determine where equipment and parts
cross-referencing will reside by September 30, 1999.
Measurement
Standards for
Exceeds Expectations: Complete the task definition and the approach to be taken to reclassify
inventory,standardize nomenclature and determine where equipment and parts
crass-referencing will reside by August 31, 1999.
Resources needed: Assistance of assigned project specialists, maintenance supervisors, purchasing
personnel and warehouse personnel in completing the planning process.
Objective 6 Working with the P&S and W&P Users Group, develop a process that defines how the O&M
planning and scheduling process will function with warehouse and purchasing,
Measurement
Standards for
Meets Expectations: Complete development of a process flow chart and responsibility table defining
the required steps and responsible party for each step in the process by
December 31, 1999.
Measurement
Standards for
Exceeds Expectations: Complete development of a process flow chart and responsibility table defining
the required steps and responsible party for each step in the process by
November 30, 1999,
Resources needed: Assistance of assigned project specialists, maintenance supervisors, purchasing
personnel and warehouse personnel in completing the planning process.
Continued
Section 5. Future Performance Objectives (Continued)
Objective 7 Complete the testing of the planning and scheduling module for functionality. -
Measurement
Standards for
Meets Expectations: Complete the testing of the planning and scheduling module in the CMMS by
September 30, 1999.
Measurement
Standards for
Exceeds Expectations: Complete the testing of the planning and scheduling module in the CMMS by
August 31, 1999.
Resources needed: Assistance of the CMMS Support Group and I.T. Department as required to review the
module.
Objective 8 As a member of the Asset Management Group#2 develop the maintenance planning and
scheduling program. The development will be under the direction of the Maintenance Division
supervision and subject to their review.
Measurement
Standards for
Meets Expectations: Complete the development of the planning and scheduling program for fourth
quarter Implementation by March 31,2000.
Measurement
Standards for
Exceeds Expectations: Complete the development of the planning and scheduling program for fourth
quarter implementation by February 28,2000.
Resources needed: Asset Management Group#2 will provide timely development for review by maintenance
supervision. Maintenance supervision will provide prompt review in support of the
development process.
Section 5. Future Performance Objectives (Continued)
Objective 9 Implement the planning and scheduling program for the preliminary and primary treatment plant
process areas at both plant facilities. -
Measurement
Standards for
Meets Expectations: Implement the planning and scheduling program as defined by June 30, 2000.
Measurement
Standards for
Exceeds Expectations: Implement the planning and scheduling program as defined by May 31,2000.
Resources needed: The maintenance divisions must complete the detailed task analysis and develop the
parts list for the preliminary treatment and primary treatment process areas to facilitate
the program Implementation.
Objective 10 Setup a file system that will accommodate approximately three thousand (3000) O&M manual
data forms,with the associated tables of contents,with a total sheet count of approximately ten
thousand (10,000). Arrange data forms by the engineering projectjob number and in the proper
sequence.
Measurement
Standards for
Meets Expectations: Complete the project by June 30,2000.
Measurement
Standards for
Exceeds Expectations: Complete the project by March 31, 2000.
Resources needed: Assistance of the Office Technician (Moira Sullivan) and the assigned project
specialist(Dale Brooks).
Continued
,c Section 5. Future Performance Objectives (Continued)
` Objective 11 Write a policy and procedure handbook for the O&M Library system. The policy and procedure
handbook will Include criteria for book placement,book appearance, proper database operation
and proper database use. Also Integrate the equipment tag data collection procedure into the
handbook.
Measurement
Standards for
Meets Expectations: Complete the policy and procedure handbook for the O&M Library system by
June 30,2000.
Measurement
Standards for
Exceeds Expectations: Complete the policy and procedure handbook for the O&M Library system by
March 31,2000.
Resources needed: Assistance of consultant with writing draft handbook.
Objective 12 Develop and Implement the O&M Library database system. Support the Information Technology
group In the development of the Web based client Interface for check in and check out
capabilities. Increase the repository of data entries to 2700 during fiscal year 1999-2000,with a
minimum of 500 data entries being completed in the first quarter.
Measurement
Standards for
Meets Expectations: Complete the 2700 data entries by June 30,2000
Measurement
Standards for
Exceeds Expectations: Complete the 2700 data entries by March 31,2000.
Resources needed: Assistance of the Office Specialist(Moire Sullivan) Project Specialist(Dale Brooks)and
the assigned Information Technology group personnel.
Objective 13 Perform a detailed analysis of the equipment level maintenance tasks for the Instrumentations
and electrical equipment In the preliminary, primary and secondary treatment plant processes. 1
The evaluation will be subject to following the criteria established for the managed malatenance
program. The work will Include verifying codes, verifying maintenance strategy, determining
maintenance Interval, establishing task time and Identifying the need for activity codes and parts
lists. Equipment requiring maintenance will then be scheduled Into the annual maintenance
program
Measurement
Standards for
Meets Expectations: Complete the analysis of the Identified equipment for preliminary treatment by
September 30, 1999, analysis of primary treatment by December 31, 1999 and
secondary treatment by March 31, 2000. Provide a spreadsheet listing the
equipment,results of the analysis and the maintenance schedule determined.
Measurement
Standards for
Exceeds Expectations: Complete the analysis of the Identified equipment for preliminary treatment by
August 31, 1999, analysis of primary treatment by November 30, 1999 and
secondary treatment by February 28, 2000. Provide a spreadsheet listing the
equipment,results of the analysis and the maintenance schedule determined.
Resources needed: Joe Tucker and Asset Management Group #1 will deliver reconciled databases for each
process area Identified at the beginning of the fiscal year quarter that they are due for
analysis. Any deviation of the schedule will result in shifting due dates by the
appropriate time frame.
Objective 14 Develop or modify the activity codes and parts lists for the Instrumentation and electrical
equipment in the preliminary and primary treatment processes that were identified during the
maintenance task analysis.
Measurement
Standards for
Meets Expectations: Complete the activity codes and parts lists for the subject equipment and enter
them Into the CMMS by June 30,2000.
Measurement
Standards for
Exceeds Expectations: Complete the activity codes and parts lists for the subject equipment and enter
them into the CMMS by April 30,2000.
Resources needed: Joe Tucker and Asset Management Group #1 will deliver reconciled databases for each
process area Identified at the beginning of the fiscal year quarter that they are due for
analysis and the analysis must be completed on schedule. Any deviation of the
schedule will result in shifting due dates by the appropriate time frame.
W
Continued
II '
Y
Objective 15 Complete the field walk-down with the J-42 consultants and review loop drawings for
the preliminary,primary,secondary,digestion,effluent pumping, central generation
and utilities at both plant facilities.
Measurement
Standards for
Meets Expectations: Complete the walk-down and loop drawing reviews for the preliminary,
primary and secondary facilities at both plants by September 30, 1999.
Complete the walk-down and loop drawing reviews for digestion at
both plant facilities and effluent pumping at plant 2 by March 31,2000.
Complete the walk down and loop drawing reviews for the central
generation facilities and utilities at both plant facilities by June 30,
2000.
Measurement
Standards for
Exceeds Expectations: Complete the walk-down and loop drawing reviews for the preliminary,
primary and secondary facilities at both plants by August 31,1999.
Complete the walk-down and loop drawing reviews for digestion at
both plant facilities and effluent pumping at plant 2 by February 28,
2000. Complete the walk down and loop drawing reviews for the
central generation facilities and utilities at both plant facilities by May
31,2000.
Resources needed: The engineering department and Reinvention Automation Project(J42)
consultant must stay on schedule or the time frames to provide assistance will
be adjusted as required to support the new project schedule.
Objective 16 Provide personnel to support the Y2K effort. The support will include personnel for
contingency planning,re-medlation,work-around and testing of Imbedded systems and
continuous evaluation of newly purchased equipment to ensure Y2K compliance.
Measurement
Standards for
Meets Expectations: Complete contingency planning support by September 30,1999.
Complete Imbedded systems work and testing for the plant process
and pump station equipment by December 31,1999. Complete the
evaluation and documentation of newly purchased equipment to
determine If it is Y2K compliant by March 31, 2000.
Measurement
Standards for
Exceeds Expectations: Complete contingency planning support by August 31, 1999. Complete
imbedded systems work and testing for the plant process and pump
station equipment by November 30, 1999. Complete the evaluation and
documentation of newly purchased equipment to determine if it is Y2K
compliant by February 28,2000.
Resources needed: Direction and support of Y2K O&M project manager and Y2K consultant.
Continued
^ uu1
Section 5. Future Performance Objectives (Continued) 0
Objective 17 Assist Safety and Emergency Response Division with the Hazardous Energy
Control procedure development.
Measurement
Standards for
Meets Expectations: Assist Safety and Emergency Response personnel and the
consultant with development of lockout and tagout procedures.
Complete 75 procedures each quarter In the Mechanical
division. Work with the CMMS Support Group to ensure
procedures are properly entered into CMMS each quarter.
Measurement
Standards for
Exceeds Expectations: Assist Safety and Emergency Response personnel and the
consultant with development of lockout and tagout procedures.
Complete 100 procedures each quarter in the Mechanical
division. Work with the CMMS Support Group to ensure
procedures are properly entered Into CMMS each quarter.
Resources needed: Division personnel under the direction of front line supervision
will provide necessary technical Input to the lockout and tagout
procedures. Safety and Emergency Response and consultant
will develop final draft documents. The CMMS Support Group
will provide resources to enter the templates Into the CMMS
database.
Objective 18 Provide the oversight necessary to ensure that the Instrumentation/Electrical
Division Budget remains within projected limits for fiscal year 1998/99.
Measurement
Standards for
Meets Expectations: The Instrumentation/Electrical Division overall budget will fall within
the fiscal year 1998/99 bottom line number.
Measurement
Standards for
Exceeds Expectations: No more than two single line Items of the Instrumentation/Electrical
Division budget with a total budget amount in excess of$2,000 for
fiscal year 1998199 shall exceed the budgeted amount by more than ten
percent while maintaining overall budget within fiscal year 1998/99
limits.
Resources needed: The Instrumentation/Electrical Division Supervision must work together
to ensure line item expenditures are properly posted and review of line
Item status must be completed on a regular basis to ensure errors are
not included when costs are posted by finance.
\lradonldatailwp.dta\om1990gonaslPRIVATMFV1999-2000 Gcalswalnt.Goals 1999-2000.doc
BOARD OF DIRECTORS WmngDx I Toed.ofDir.
09/27 99
AGENDA REPORT Item Numbe I rem Number
an)
Orange County Sanitation Distract
FROM: Penny Kyle, Board Secretary
SUBJECT: POLICY REGARDING REFUND AND CREDIT FOR SANITARY SEWER
SERVICE CHARGES
GENERAL MANAGER'S RECOMMENDATION
Consideration of request by Director Gullixson to have staff, General Counsel and the
FAHR Committee reevaluate and conduct further studies relating to granting refunds to
Yorba Linda (and other areas) property owners of sewer service charges paid by
property owners for parcels not connected to the District's system.
SUMMARY
Please see General Counsel's memorandum dated September 15, 1999.
PROJECT/CONTRACT COST SUMMARY
N/A
BUDGET IMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
ALTERNATIVES
CEQA FINDINGS
ATTACHMENTS
General Counsel's Memo dated 9/15/99
MINUTES OF MEETING OF JOINT GROUNDWATER REPLENISHMENT SYSTEM
COOPERATIVE COMMITTEE, ORANGE COUNTY SANITATION DISTRICT
AND ORANGE COUNTY WATER DISTRICT
August 24, 1999, 5:30 p.m.
A meeting of the Joint OCSD/OCWD Cooperative Committee for the Groundwater
Replenishment System was held in the Boardroom of the OCWD offices at
5:30 p.m. on August 24, 1999. Members of the Committee present were:
OCSD Directors John Collins, Vice Chairman, Norman Eckenrode, Peer Swan, and
General Manager Donald F. McIntyre, Alternate; OCWD Directors Philip L.
Anthony, Lawrence P. Kraemer Jr., and Iry Pickler, Chairman. OCWD Alternate
member General Manager Mills was not in attendance. OCSD General Counsels
Thomas L. Woodruff and Brad Hogin, and OCWD General Counsel Clark Ide were
present. Staff attending were Tom Dawes, GWR System Project Manager; OCSD
staff: Director of Technical Services Bob Ghirelli, Planning Manager Jim Herberg,
Director of O&M Bob Ooten, Director of Finance Gary Streed, and Director of
Communications Michelle Tuchman. OCWD staff: Associate General Manager
John Kennedy, Senior Engineer Greg Leslie, Engineering Manager Mike Markus,
Public Information Officer Ron Wildermuth, Administrative Assistant Jill Everhart,
and Recording Secretary Judy-Rae Karlsen. Others in attendance included OCWD
Directors Kelly Rowe, Jerry King, Wes Bannister, Camp Dresser & McKee Inc.
staff: Kellene Burn-Lucht and Dick Corneille; and Brenda Deeley representing
Nelson Communications Group.
1 . Minutes of previous meeting
Upon motion duly made, seconded and carried, the Minutes of the Joint
Committee meeting held August 12, 1999 were approved as mailed.
MATTERS FOR CONSIDERATION
1 . Status Report (Discussion of this item was advanced on tonight's agenda)
GWR System Project Manager Tom Dawes provided a status update on the
following Grant proposals: California Water Resources Planning Grant, California
Energy Commission Research Grant, and Environmental Protection Agency (EPA)
Grant.
Mr. Dawes provided a list of potential expenditures affecting the GWR System
budget. The Committee concurred with his recommendations for the following
expenditures:
• Issuance of a Task Order to RMW Contractors not to exceed the amount of
$15,000 (rather than the $25,000 to $40,000 originally estimated) to assist
with the Bureau of Reclamation's additional Cultural Resources
requirements.
• Issuance of Request for Proposals for an Ultra Violet (UV) specialist to assist
with acquiring Department of Health Services approval and certification of
UV disinfection equipment.
Consultant Reports: Brenda Deeley of Nelson Communications Group presented a
summary of public relations activities; and Kellene Burn-Lucht of Camp Dresser &
McKee Inc. reported on the August 12 meeting of the Technical Advisory Team
Captains and the Management Advisory Team and noted that the Management
Advisory Team will be meeting on Wednesday, September 22, 1999.
2. GWRS Project Governance
GWR System Project Manager Tom Dawes provided an in-depth analysis of
governance options for Committee review. He reviewed and clarified the financial
status of both Districts and outlined projected GWR System goals for each District.
Following discussion, Chairman Pickler directed staff to draft a comprehensive
operating agreement and procedure manual defining daily operational/governance
issues that will satisfy the requirements of both Districts and requested that this
item be agendized for discussion in October.
3. Directors Comments
It was the consensus of the Committee to review the publicity piece, which aired
on the COX television channel entitled, "The water is good, you can drink it."
Staff was directed to obtain a copy of the videotape for Board review prior to the
next GWR System Joint Committee meeting. Dr. Leslie was commended for his
performance in the documentary.
Director Anthony announced that Director Swan was recently elected to the
Metropolitan Water District Board of Directors.
ADJOURNMENT
The next Joint Committee meeting is scheduled for September 28, 1999 at
5:00 p.m. at the Orange County Water District Administrative Offices,
10500 Ellis Avenue, Fountain Valley.
BOARD OF DIRECTORS Meeting Date T0013d gr.
g/zz sg
AGENDA REPORT Item NumO Rem umtw
7�
Orange County Sanitation District /
FROM: David LudvJ Diltor of Engineering
Originator: Jim Herberg, Engineering Supervisor
SUBJECT: STRATEGIC PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT,
JOB NO. J-40-4
GENERAL MANAGER'S RECOMMENDATION
Authorize Environmental Science Associates to prepare and circulate the Final Program
Environmental Impact Report for the Strategic Plan in compliance with CEQA
requirements.
SUMMARY
Since 1989, the District has been operating under the 1989 Master Plan Program
Environmental Impact Report. The recently completed Strategic Plan developed a
revised operational plan and capital improvement program through 2020. A draft
program EIR (DEIR) has been prepared for the Strategic Plan as required by the
California Environmental Quality Act (CEQA).
The DEIR public review and comment period was from June 23, 1999 through
August 16, 1999. A public hearing was held in conjunction with the July 21, 1999 Board
meeting. Three members of the public addressed the Board at the hearing. Written
comments were received from 23 individuals, interest groups, and public agencies.
Staff is seeking authorization to prepare and circulate the final program EIR (FEIR) for
the Strategic Plan, including responses to all comments received in writing and at the
public hearing. Certification of the FEIR by the Board of Directors is scheduled for
October 27, 1999.
PROJECT/CONTRACT COST SUMMARY
Not applicable.
BUDGETIMPACT
❑ This item has been budgeted. (Line item: )
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
® Not applicable (information item)
cxgae.npwa,onn n.pw.wm m.,sy.wu+uaw.eec
R. MWoe Page 1
ADDITIONAL INFORMATION
The following is a overview of the Strategic Plan EIR process:
Circulation of Notice of Preparation October 1997
Advisory Committee (PAC 2) Workshop June 17, 1999
Board Workshop June 19, 1999
Board Authorization for Circulation of Draft EIR June 23, 1999
Draft EIR Public Review Period June 29—August 16, 1999
Public Hearing July 21, 1999
Board Authorization for Preparation of Final EIR September 22, 1999
Final EIR Distribution October 5, 1999
EIR Certification October 27, 1999
Staff and Consultants will prepare responses to all public comments upon Board
authorization to prepare the FEIR. Prior to finalizing the FEIR for public circulation, the
Ad Hoc Committee Re Strategic Plan will review the public comments on the DEIR and
proposed responses to be included in the FEIR. Resolutions for certification of the
FEIR will be prepared and reviewed by General Counsel.
The FEIR is scheduled for circulation to the public on October 5, 1999. Board members
will receive copies of the complete Final EIR for review prior to the October 27, 1999
meeting. The FEIR consists of the DEIR togetherwith an attachment containing
responses to public comments. The California Environmental Quality Act (CEQA)
requires that the FEIR be circulated to the public for a minimum of 10 days prior to
Certification.
ALTERNATIVES
Not approving preparation of the FEIR. If preparation of the FEIR is not authorized, new
projects identified by the Strategic Plan that were not included in the 1989 Master Plan
EIR would be delayed and incur additional costs for preparation of individual EIRs or
Negative Declarations.
CEQA FINDINGS
Board certification of the Strategic Plan FEIR is scheduled for October 1999.
ATTACHMENTS
None
G NIpIOGMpenOa aaM1 PeprtaVnnl6 aiGaYd61 B]]6U.J¢
aa„a. . Page 2
17
BOARD OF DIRECTORS Meetlng Date Toatl.of Dir.
9-22-99
AGENDA REPORT Item Number Item umber
Orange County Sanitation District
FROM: David Lud
tor of Engineering
Originator: Jim Harris, Project Manager
SUBJECT: HIGH PRESSURE COMPRESSED AIR SYSTEMS
AT PLANT NO. 2, JOB NO. P2-61
GENERAL MANAGER'S RECOMMENDATION
(1)Approve plans and specifications for High Pressure Compressed Air Systems
at Plant No. 2, Job No. P2-61; (2) Receive and file bid tabulation and
recommendation; and (3)Award a contract to R. Fox Construction, Inc. for High
Pressure Compressed Air Systems at Plant No. 2, Job No. P2-61,for an amount
not to exceed $201,700.
SUMMARY
The plans and specifications for Job No. P2-61 were completed in May 1999.
The project designer was Hilbert & Associates. The current engineer's estimate
is $210,000 and the budget is $260,500.
This project will replace existing plant air compressors that have reached the end
of their useful mechanical life. Maintenance staff installed the compressors in the
early 1970's. Due to the age of the equipment, maintenance staff can no longer
repair or support the equipment due to the lack of spare parts. This design
includes the installation of two new high efficiency compressors, associated
piping, and support equipment. This project will reduce overall electrical and
water consumption, compressor maintenance costs, and increase the life of
equipment throughout the facilities.
On August 24, 1999 six bids were received ranging from $253,544 to the low bid
of$201,700 submitted by R. Fox Construction, Inc. The Director of Engineering
recommends award of the contract to R. Fox Construction, Inc. Construction
completion is scheduled for April 2000.
PROJECT/CONTRACT COST SUMMARY
See attached Budget Information Table. The Board is being asked to authorized
$201,700 for the construction contract, $86,032 for Construction Inspection Staff,
and $75,000 for programming support and implementation by Process Control
Integration Staff.
G.WooE endaG ft Rep Ui nl9 rds12E194S990M
ReN . W010 Page 1
BUDGETIMPACT
® This item has been budgeted. (Line item: Section a,page 10)
❑ This item has been budgeted, but there are insufficient funds.
❑ This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
In the early 1970's, the District's Maintenance staff purchased and installed two
used reciprocating air compressors at Plant No. 2. The plant air system is critical
for providing compressed air for process control, instrumentation, tools, and other
miscellaneous uses. The equipment has provided many years of service, but
due to its age and the lack of spare parts, the Maintenance staff can no longer
keep the equipment available. The primary concern is the compressors are
introducing water and oil into the air system and are fouling instrumentation and
other equipment causing excessive use of staff time to clean and repair critical
systems. Currently, the plant air compressors are out of service. Maintenance
staff has rented two temporary compressors to serve the plant. The new design
will remove the existing obsolete equipment and provide a new permanent
facility.
A secondary problem is the one time use of plant water for cooling the existing
equipment. The water is then wasted to drain and returned to the plant process.
This is a waste of water and energy. The new compressors and dryers are
designed to be self-contained and have no need for exterior cooling.
In December 1998, the Board of Directors approved a Professional Services
Agreement with Hilbert& Associates to design the compressor replacement.
This project is the first design provided by this consultant. The completed design
includes the use of high efficiency screw type compressors, strainers, and air
dryers to preclude contamination of the plant air system.
On August 24, 1999 six bids were received ranging from $253,544 to the low bid
of$201,700 submitted by R. Fox construction, Inc., based in Tustin. The Director
of Engineering recommends award of the contract to R. Fox Construction, Inc.
Construction completion is scheduled for April 2000.
ALTERNATIVES
There are no cost effective alternatives.
G:MyWYVgvgad Wy nl BOMA 41 0339BAx
aemw: eaGm Page 2
CEQA FINDINGS
The project includes the replacement of existing equipment and was included in
the Programmatic EIR for the 1989 Master Plan. The final EIR was approved on
July 19,1989 and the Notice of Determination was filed on July 20, 1989.
ATTACHMENTS
1. Budget Information Table
2. Bid Tabulation
JRH.,jo:jak
G:M�o0B�4pQEe PN FepM1NGrM1&wEf1P16t&33AB<rc
ermm Page 3
BUDGET INFORMATION TABLE
HIGH PRESSURE COMPRESSED AIR SYSTEMS AT PLANT NO. 2
JOB NO. P2-61
�.`s'ORIGINALI�� "CURRENT' `PROPOSED PROPOSED' , °FUNDS.-' 7 THIS ' " PROPOSED ESTIMATED ESTIMATED
IP[tO,I TFTASIC t :AUTHORIZED. PROJECT' BUDGET. REVISED AUTHORIZED AUTHORIZATION 'TOTAL EXPENDITURE EXPENDED
IVY, 't Fd„ BUDGET: ' BUDGEf'" INCREASE. BUDGET-; TODATE � •REQUEST -I . AUTHORIZATION TO DATE TO DATE(%).
Project Development $ 1.310 $ 1,310 $ 1,310 $ 1,310 $ 1.310 $ 460 35%
Design Staff $ 37.760 $ 37,760 $ 37,760 $ 37.760 $ 37,760 $ 10,000 26%
Consultant PSA $ 55,000 $ 55.000 $ 55.0001 $ 42,990 $ 42.990 $ 42.000 98%
Construction Contract $ 260.500 $ 260,500 $ 200.500 $ 201,700 $ 201,700 0%
Construction Other $ 751000 $ 75,000 $ 75,000 $ 75.000 $ 75,000 0%
Construction Stag $ 88032 $ 86,032 $ 86,032 $ 86,032 $ 86,032 $ 2.590 0%
Contingency $ 44,398 $ 44398 $ 44398 $ 0%
TOTAL $ 500.000 $ 660,000 $ - $ 560,000 1 $ 82,060 $ 362,732 $ 444,792 $ 55,050 12%
Kl pxltalengU=S S CONTRACTSWM14AR Cmwty lw Bid Budget TaelexlatDicldcta
August 24, 1999
11:00 a.m.
BID TABULATION
High Pressure Compressed Air System at Plant No. 2
Job No. P2-61
Engineers Estimate: $210,000 Construction Contract Budget: $260,500
CONTRACTOR TOTAL BID
1. R. Fox Construction, Inc. $ 201,700
2. Margate Construction, Inc. $ 213,300
3. S.S. Mechanical Corp. $ 222,996
4. MMC Inc. $ 224,101
5. Olsson Construction $ 227,900
6. Kovaleff Mechanical Services, Inc. $ 253,544
7. $
1 have reviewed the proposals submitted for the above project and find that the low bid
is a responsible bid. I, therefore, recommend award to R. Fox Construction, Inc., in
the bid amount of$201,700 as the lowest and best bid.
zxjaz�-�
David A. Ludwin, P.E.
Director of Engineering
H:\wp.dlelengVOBS 8 CONTRACTW2-61 kp2-61 Bid Tab doc
Revised 05/1W98
OCSD • P.O.Box 8127 . Founi in Valley,CA 92728-8127 • (714) 952-2411
BOARD OF DIRECTORS Meedng DMe To Bd.of Dr.
s/31ros
AGENDA REPORT Rem Number ItemNumbu
IB
Orange County Sanitation District
FROM: David Ludwin, Director of Engineering
Originator: Bud Patmquist, Senior Engineer
SUBJECT: HUNTINGTON BEACH CLOSURE INCIDENT INVESTIGATION
GENERAL MANAGER'S RECOMMENDATION
Ratify use of General Manager's Emergency Purchasing Authority, Resolution
No. OCSD 98-21, for purchase orders issued in connection with the Huntington Beach
closure for Investigation of Coast Trunk Siphon (Specification No. P-188), in an amount
not exceed $455,000.
SUMMARY
This item is a notification of the General Manager's Emergency Purchasing Authority,
Resolution No. OCSD 98-21 for Purchase Orders in Excess of$100,000 each.
Three Purchase Orders in excess of$100,000 were issued to Contractors to support
the beach closure incident. The Purchase Orders were issued with "not to exceed"
amounts as the magnitude of the work to complete the investigation was not known at
the time when the work began. These purchase orders were issued under sole source
agreements due to the events surrounding the beach closure and the concern for safety
hazards to the general public (high coliform counts). Securing multiple vendor bids,
purchase approval and processing, installation, cleaning and testing of the sewer lines
could not be completed by normal methods in time to support the wide scale
investigation requirements. The afore mentioned were considered emergency items
and have been approved by the General Manager. All work associated with the three
purchase orders are expected to be completed by the end of September 1999. A
summary of the Purchase Orders follows.
Purchase Orders Description of Purchase Order Purchase Order
(Vendors) Amount
Jamison Engineering . Testing of State Beach sewers $200,000
. Hydrotest of siphon
. Installation by bypass system
. Finish cleaning of siphon and confined
space entry
Sancon Engineering . Heavy siphon cleaning, bucket method $130,000
. Leak Investigation
Foothill Engineering . Supervised installation by bypass system $125,000
and Dewatering . Furnish, maintain and monitor four pumps
and approximately 1400 feet of 120•inch
ie
\4Ma,W.alWp.tluYp.A.Vlwm b.Me B.pw.N WG Bum A.-d.R,,. l 1e.
Page 1
PROJECT/CONTRACT COST SUMMARY
Not Applicable
BUDGETIMPACT
❑ This item has been budgeted. (Line tlem: )
❑ This item has been budgeted, but there are insufficient funds.
® This item has not been budgeted.
❑ Not applicable (information item)
ADDITIONAL INFORMATION
In June, 1999 high coliform counts were observed for about a mile of the Huntington
State Beach from north of Brookhurst Street to north of Newland Street. As a result, the
Orange County Health Care Agency decided to close the beach during the July 41b
holiday and beyond. Presently, the County Health Officer has elected to continue
posting health advisory signs along approximately 2 1/2 miles of the beach from the
Santa Ana River north.
To identify the source of the problem, the District investigated the condition of laterals
serving the State Beach and the connection to the District trunkline. One break in the
State owned line was found and repaired. However, the high bacteria counts remained.
Subsequently, the District redirected its investigation efforts to the Coast Trunk Siphon
to inspect for possible leaks. Prior to performing a closed circuit Tying of this siphon,
Staff had to expend a considerable amount of time cleaning the Coast Trunk Siphon of
tons of grit, which required the installation of a bypass pumping system. The
investigation results indicated that the Coast Trunk Sewer is not leaking.
ALTERNATIVES
Not Applicable
CEQA FINDINGS
N/A
ATTACHMENTS
None
BP lac
1Ye6anWeblMp.E, gs mf Mftende flepu klMB WAg.M Rec WAwn 18E
Homed � Page 2
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for he Regular Board Meeting of Orange County Sanitation
District to be held on d , 19 9, was duly posted for public
inspection in the main lobby of the Districts' offices on S , 19Py.
n/ IN WITNESS WHEREOF, I have hereunto set my hand this�day of
Penny M. Kyle,Secretary
Board of Directors
Orange County Sanitation District
H:\WP.DTA\ADMIN\BS\FORMS\AGENDA CERTIFICATION.DOC
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for the Regular Board Meeting of Orange County Sanitation
District, to be held on 6- e.l7 -221— , 19f, was duly posted for public
inspection in the main lobby of the Districts' offices on ( GC , 19-112
Z�
IN WITNESS WHEREOF, I have hereunto set my hand this day of
Penny M. KyW, Secretarl
Board of Directors
Orange County Sanitation District
HA W P.DTMADMMIBS\FORMS\F27 A