HomeMy WebLinkAbout1995-05-24 COUNTY SANITATION DISTRICTS
OF ORANGE COUNTY, CALIFORNIA
G.O. 8OX 8127.FOUNTAIN VALLEY.CALIFORNIA 9272"127
A.. 10944 ELLIS. FOUNTAIN VALLEY,CALIFORNIA 92708-7018
�( (714)!M-2411
I I May 19, 1995
NOTICE OF MEETING
JOINT BOARDS OF DIRECTORS
COUNTY SANITATION DISTRICTS
NOS. 1, 2, 3, 5, 6, 7, 11, 13 AND 14
OF ORANGE COUNTY, CALIFORNIA
WEDNESDAY. MAY 24. 1995 - 7.30 P.M.
DISTRICTS' ADMINISTRATIVE OFFICES
10844 Ellis Avenue
Fountain Valley, Califomia 92708
The Regular Meeting of the Joint Boards of Directors of County Sanitation Districts Nos. 1,2,3,5,6, 7,
11, 13 and 14 of Orange County, California,will be held at the above location,time and date.
Board Secre[a
Tentatively-Scheduled Upcoming Meetings:
STEERING COMMITTEE - Wednesday,May 24, 1995,at 5:30 p.m.
PLANNING, DESIGN AND CONSTRUCTION
COMMITTEE - Thursday,June 1, 1995.at 5:30 p.m.
AD HOC COMMITTEE RE SPACE
UTILIZATION STUDY FOR
ADMINISTRATIVE EMPLOYEES - Friday,June 2, 1995,at 4:00 p.m.
DIRECTORS'ORIENTATIONITOUR - Saturday,June 3, 1995, at 9:00 a.m.
OPERATIONS,MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE - Wednesday.June 7, 1995,at 5:30 p.m.
FINANCE,ADMINISTRATIVE AND HUMAN
RESOURCES COMMITTEE - Wednesday,June 14, 1995,at 5:30 p.m.
DIRECTORS'ORIENTATIONITOUR - Saturday,June 17, 1995,at 9:00 a.m.
EXECUTIVE COMMITTEE - Wednesday,June 21, 1995,at 5:30 p.m.
\..01
COUNTY SANITATION DISTRICTS
.1 ORANGE COUNTY. CALIFORNIA
tM44 ELLIS AVENUE
vo.eax 8127
FOUNTAIN VALLEY.ULIFOPNIA 827211
2721 I
1714I aW.2411 �/
JOINT BOARD AND EXECUTIVE COMMITTEE MEETING DATES
Executive Committee Meelinas Joint Board Meetings
May May 17, 1995 May 24, 1995
June Jun 21, 1995 Jun 28, 1995
July Jul 19, 1995 Jul 26, 1995
August None Scheduled Aug 23, 1995
September Sep 20, 1995 Sep 27, 1995
October Oct 18, 1995 Oct 25, 1995
November None Scheduled Nov 22, 1995
December None Scheduled Dec 27, 1995
January Jan 17, 1996 Jan 24, 1996
February Feb 21, 1996 Feb 28, 1996
March Mar20, 1996 Mar27, 1996
April Apr 17, 1996 Apr 24, 1996
May May 15, 1996 May 22, 1996
rAGENDA
JOINT BOARDS OF DIRECTORS
COUNTY SANITATION DISTRICTS
NOS. 1, 2, 3, 5, 6, 7, 11, 13 AND 14
OF ORANGE COUNTY, CALIFORNIA
DISTRICTS'ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CA 92708
REGULAR MEETING
MAY 24, 1995 .7:30 P.M.
j In accordance with the requirements of California Government Code Section 54954.2,this j
j agenda has been posted in the main lobby of the Districts'Administrative Offices not less
than 72 hours prior to the meeting date and time above. All written materials relating to !
each agenda item are available for public inspection in the office of the Board Secretary.
j
In the event any matter not listed on this agenda is proposed to be submitted to the Boards i
! for discussion and/or action, it will be done in compliance with Section 54954.2(b) as an
j emergency item or that there is a need to take immediate action which need came to the I
attention of the Districts subsequent to the posting of the agenda, or as set forth on a
j supplemental agenda posted not less than 72 hours prior to the meeting date. )
I
(1) Pledge of Allegiance and Invocation
(2) Roll call
(3) Consideration of motion to receive and file minute excerpts of member agencies relating
to appointment of Directors, if any. (See listing in Board Meeting folders)
(4) EACH DISTRICT
Annual election of Chair and Chair pro tem of the Boards:
(a) District 1 (f) District 7
(b) District 2 (g) District 11
(c) District 3 (h) District 13
(d) District 5 (i) District 14
(a) District 6
(5) Appointment of Chair pro tem, if necessary
(6) Public Comments: All persons wishing to address the Boards on specific agenda items
or matters of general interest should do so at this time. As determined by the Chair,
speakers may be deferred until the speck item is taken for discussion and remarks
may be limited to five minutes.
Matters of interest addressed by a member of the public and not listed on this agenda
cannot have action taken by the Boards of Directors except as authorized by Section
54954.2(b).
05/24/95
(7) The Joint Chair, General Manager and General Counsel present verbal reports on
miscellaneous matters of general interest to the Directors. These reports are for
information only and require no action by the Directors. �...
(a) Report of Joint Chair, consideration of Resolutions or commendations,
presentations and awards
(b) Report of General Manager
(C) Report of General Counsel
(8) EACH DISTRICT
ACTION: If no Corections or amendments are made, the following minutes will be
deemed approved as mailed and be so ordered by the Chair:
District 1 - April 26, 1995 regular
District 2 - April 26, 1995 regular
District 3 - April 26, 1995 regular
District 5 - April 26, 1995 regular
District 6 - April 26, 1995 regular
District 7 - April 26, 1995 regular
District 11 - April 26, 1995 regular
District 13 - March 8, 1995 regular, March 29, 1995 special,April 12,
1995 special and April 26, 1995 regular
District 14 - March 8, 1995 regular, March 29, 1995 special,April 12,
1995 special and April 26, 1995 regular
(9) ALL DISTRICTS
Consideration of roll Call vote motion ratifying payment of claims of the joint and
individual Districts as follows: (Each Director shall be called only once and that vote will
be regarded as the same for each District represented unless a Director expresses a
desire to vote differently for any District.)
(Cored oIa can Yi89r NI9J + 4wti4±67as f
DISTRICT NO 13 - 0.00 0.00 000 69.01
DISTRICT NO.14 227,6a101 7r 2,575.00 3l7,ST2]5 5,a2fi.
DISTRICTS NOS.7614 JOINT - 77�B.B4 691.17 fi659.f0 691.17
LM 62 95 26fi.17 S59n115 S55B5.95
05/03/95 05/17/95
ALL DISTRICTS
Joint Operating Fund - $804.262.45 $449,899.42
Capital Outlay Revolving Fund - 405,563.40 471,447.11
Joint Working Capital Fund - 210,240.65 464,347.47
Self-Funded Insurance Funds - 78,626.43 4,042.26
DISTRICT NO. 1 - 7,065.63 0.00
DISTRICT NO, 2 - 26.478.88 69,850.90
DISTRICT NO. 3 - 55,381.28 167,012.17
DISTRICT NO, 5 - 6,706.64 6,429.09
DISTRICT NO. 6 - 4,672.86 0.00
DISTRICT NO- 7 - 7,420.18 17,345.53
DISTRICT NO. 11 - 42,016.27 5,164.82
DISTRICT NO. 13 - 101.37 0.00
DISTRICT NO. 14 - 119,681.33 2,180.00
DISTRICTS NOS. 3 & 11 JOINT - 2,500.00 0.00
DISTRICTS NOS. 5 & 6 JOINT - 0.00 2,637.94
DISTRICTS NOS. 6 & 7 JOINT - 210.71 3,161.28
DISTRICTS NOS. 7 & 14 JOINT - 19.79 6,221.73
$1,769,947.87 $1,669,739.72
-2-
05/24/95
(10) CONSENT CALENDAR- ITEMS 10(a)THROUGH 10(b)
All matters placed on the consent calendar are considered as not requiring discussion or further
i explanation and unless any particular item is requested to be removed from the consent calendar
by a Director, staff member or member of the public in attendance, there will be no separate
discussion of these items. All items on the consent calendar will be enacted by one action
i approving all motions, and casting a unanimous ballot for resolutions included on the consent
calendar. All items removed from the consent calendar shall be considered in the regular order
of business. I
I
Members of the public who wish to remove an item from the consent calendar shall, upon
i recognition by the chair, state their name, address and designate by letter the item to be
i removed from the consent calendar.
The Chair will determine if any items are to be deleted from the consent calendar. i
Consideration of action to approve all agenda items appearing on the consent calendar not
specifically removed from same, as follows:
ALL DISTRICTS
(a) Consideration of motion authorizing staff to issue a purchase order to Pioneer-Standard
Electronics, Inc., in a total amount of$36.342.72. plus sales tax, for the Purchase of
Eight Celebris 590 Desktop Computers (Specification No. E-255), in accordance with
the terms and conditions of the California Multiple Awards Schedule Program of the
State of California and State of California Contract No. 3.94-7o-0037A.
DISTRICTS 6. 7 & 14
(Carried over from 4126/95 Board Meeting due to lack of a quorum in District 14)
(b) Consideration of motion approving Change Order No. 1 to the plans and specifications
for Baker-Gisler Interceptor, from Fairview Road to Plant No. 1, Contract No. 14-1-1A,
for an addition of$33,676.16 to the contract with Mladen eunuch Construction Co., Inc.
for twelve items of additional work, and granting a time extension of two calendar days
for completion of said additional work.
END OF CONSENT CALENDAR
(11) ALL DISTRICTS
Consideration of items deleted from Consent Calendar, if any
-3-
05/24/95
r
(12) ALL DISTRICTS
Consideration of motion to receive, file and approve the staff Summary Financial Report for the
nine-month period ending March 31, 1995.
(13) ALL DISTRICTS
(a) Minutes of the Executive Committee
(1) Receive and file draft Steering Committee Minutes for the meeting held on
April 26, 1995.
(2) Receive and file draft Ad Hoc Committee re Space Utilization Study for
Administrative Employees Minutes for the meeting held on April 28, 1995.
(3) Receive and file draft Operations, Maintenance and Technical Services
Committee Minutes for the meeting held on May 3, 1995.
(4) Receive and file draft Planning, Design and Construction Committee Minutes for
the meeting held on May 4, 1995.
(5) Receive and file draft Finance, Administrative and Human Resources
Committee Minutes for the meeting held on May 10, 1995.
(6) Receive and file draft Executive Committee Minutes for the meeting held on
May 17, 1995.
(b) Consideration of the following actions recommended by said committees,
(1) OMTS95-023 Consideration of motion authorizing a 1995 Summer Work
Program for painting and grounds maintenance and other miscellaneous work.
(2) OMTS95-024 Consideration of Resolution No. 9549, awarding contract for
Marine Monitoring Vessel for Surveying Coastal Waters, Specification
No. P-158, to Enchanter, Inc. for the period July 1, 1995 to June 30, 1996, for
an annual amount not to exceed $100,800.00, with provisions for two one-year
extensions.
-4-
[ITEM (13)(b) CONTINUED ON PAGE 51
05/24/95
(13) ALL DISTRICTS (Continued from page 4)
(b) (3) OMTS95-025 Consideration of the following actions relative to the the Santa
Monica Bay Restoration Project(SMBRP) epidemiological survey:
(a) Consideration of motion authorizing the Districts' participation in the
Santa Monica Bay Restoration Project (SMBRP) epidemiological survey.
(b) Consideration of motion authorizing the General Manager to enter into a
Memorandum of Understanding (MOU)with SMBRP; and enter into a
contract with the State Water Resources Control Board (SWRCB) to
implement said MOU and to reimburse the Districts for an amount not to
exceed $180,000.00 for costs associated with labor and materials to
analyze virus samples and continue in-house efforts during this project
period through a Specific Term Employment Agreement, in form
approved by General Counsel.
(c) Consideration of motion authorizing the General Manager to enter into a
six-month Specific Tenn Employment Agreement for a Laboratory
Analyst, at a rate not to exceed $25.00 per hour(not to exceed
$26,000.00).
(d) Consideration of motion authorizing the General Manager to enter into
additional contracts, as necessary, with no increase in the authorized
amount of$180,000.00 to implement the terms of the MOU
(4) PDC95-16 Consideration of the following actions relative to Warehouse Building
at Plant No. 2, Job No. P2-35-2; Maintenance Building at Plant No. 2, Job
No. P2-35-3; Process Area Fire Protection, Signage and Water Distribution
System Modifications at Plant No. 2, Job No. P246; and Office Trailer
Relocations at Plant Nos. 1 and 2, Specification Nos. M-044 (Rebid) and
M-044-1:
(a) Consideration of motion to separate Office Trailer Relocations at Plants
Nos. 1 and 2, Specification No. M-044 (Rebid) from the balance of the
project.
(b) Consideration of Resolution No. 95-50, approving plans and
specifications for Office Trailer Relocations at Plant Nos. 1 and 2,
Specification No. M-044 (Rebid), and authorizing the General Manager
to establish the date for receipt of bids (tentative bid date is June 6,
1995).
(5) PDC95-17 Consideration of motion approving Change Order No. 6 to the plans
and specifications for Priority Projects Element of Miscellaneous Improvements
to Facilities at Plant No. 1, Job No. P1-38.2, authorizing a net addition of
$34,878.00 to the contract with Pascal & Ludwig Engineers for five items of
additional work.
-5-
[ITEM (13)(b) CONTINUED ON PAGE 6]
05/24/95
r
(13) ALL DISTRICTS (Continued from page 5)
(b) (6) PDC95-16 Consideration of motion approving Change Order No. 7 to the plans
and specifications for Secondary Treatment Expansion at Plant No. 2, Job
No. P242-2, authorizing an addition of$31,673.00 to the contract with Margate
Construction, Inc. for two items of additional work.
(7) PDC95-19 Consideration of motion approving Change Order No. 5 to the plans
and specifications for Electrification of Pump Drives at Treatment Plant No. 1,
Job No. P1-36-1; Security and Landscaping Element of Miscellaneous
Improvements to Facilities at Plant No. 1, Job No. P1-38-1; Miscellaneous
Improvements to Facilities at Plant No. 1, Job No. P1-38.4; and Miscellaneous
Improvements to Facilities at Treatment Plant No. 2, Job No. P243.3,
authorizing a net addition of$40,069.00 to the contract with Advanco
Constructors Inc., Division of gum Constructors, Inc., for 13 items of additional
or deleted work.
(8) PDC95-14 Consideration of the following actions relative to Addendum No. 2 to
the Professional Services Agreement with Lee & Ro Consulting Engineers, Inc.
for preparation of a project report, preliminary design, plans and specifications
and providing construction support services relative to Process Area Fire
Protection Signage and Water Distribution System Modifications at Plant No. 1,
Job No. P1-38-5, and Process Area Fire Protection, Signage and Water
Distribution System Modifications at Plant No. 2, Job No. P246, providing for
additional design services and construction support services:
(a) Consideration of motion to receive, file and approve the Planning,
Design and Construction Committee certification of the final negotiated
fee with Lee & Ro Consulting Engineers, Inc. for said services.
(b) Consideration of Resolution No. 95-51, approving Addendum No. 2 to
said agreement with Lee & Ro Consulting Engineers, Inc. for said
additional services, on an hourly-rate basis for labor plus overhead, plus
direct expenses, subconsultant fees and fixed profit, for an additional
amount not to exceed$186,670.00, increasing the total authorized
compensation from an amount not to exceed $523,640.00 to an amount
not to exceed $710,310.00.
(9) DP C95-20 Consideration of the following actions relative to Addendum No. 4 to
the Professional Services Agreement with John Carollo Engineers for design
and construction services, preparation of operations and maintenance manuals,
and training services re Secondary Treatment Improvements at Plant No. 1, Job
No. P1.36, and Secondary Treatment Expansion at Plant No. 2, Job No. P242,
providing for additional construction support and programming of process
control equipment and computers:
(a) Consideration of motion to receive, file and approve the Planning,
Design and Construction Committee certification of the final negotiated
fee with John Carollo Engineers for said services.
(b) Consideration of Resolution No. 95-52, approving Addendum No. 4 to
said agreement with John Carollo Engineers for said additional services,
on an hourly-rate basis for labor plus overhead, plus direct expenses and
fixed profit, for an additional amount not to exceed $750,215.00,
increasing the total authorized compensation from an amount not to
exceed $5,889,150.00 to an amount not to exceed $6,639,365.00.
-6-
[ITEM (13)(b) CONTINUED ON PAGE 7]
05/24/95
t
(13) ALL DISTRICTS (Continued from page 6)
(b) (10) FPC95.16 Consideration of motion approving Final Draft Investment Policy
Statement prepared by Chandler Liquid Asset Management, Inc. and Callan
Associates, Districts' investment advisors.
(11) FAHR95.24 Consideration of Resolution No. 95-53, extending Early Retirement
Incentive Program Provisions for all eligible Districts' employees.
(12) FAHR95-25 Consideration of Resolution No. 95-54, Providing for Classification,
Compensation and Other Terms, Conditions, Rules and Regulations of
Employment of Districts' Employees, and Repealing Resolution Nos. 79-20 and
79-21, as amended.
(14) ALL DISTRICTS
Update by Staff and Consultants concerning developments related to the County's
Commingled Investment Pool.
(15) ALL DISTRICTS
Consideration of motion changing the Regular Joint Board meeting date from Wednesday,
November 22, 1995 to Wednesday, November 15, 1995 at 7:30 p.m. due to the Thanksgiving
Holiday.
(16) ALL DISTRICTS
Consideration of motion changing the Regular Joint Board meeting date from Wednesday,
December 27, 1995 to Wednesday, December 13, 1995 at 7:30 p.m. due to the Christmas
Holiday.
(17) DISTRICTS 1. 2. 3. 5. 6. 7 & 11
Consideration of the following actions relative to proposed Ordinances Establishing Excess
Capacity Charge Program:
(a) DISTRICT 1
Consideration of the following actions relative to proposed Ordinance No. 125, An
Ordinance of the Board of Directors of County Sanitation District No. 1 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 125 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion adopting Ordinance No. 125.
-7-
[ITEM (17) CONTINUED ON PAGE 8)
05/24/95
(17) (b) DISTRICT 2 (Continued from page 7)
Consideration of the following actions relative to proposed Ordinance No.219,An
Ordinance of the Board of Directors of County Sanitation District No. 2 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 219 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion adopting Ordinance No. 219.
(c) DISTRICT 3
Consideration of the following actions relative to proposed Ordinance No. 322, An
Ordinance of the Board of Directors of County Sanitation District No. 3 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 322 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion adopting Ordinance No. 322.
(d) DISTRICT 5
Consideration of the following actions relative to proposed Ordinance No. 531,An
Ordinance of the Board of Directors of County Sanitation District No. 5 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 531 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of .�
Directors present).
(2) Consideration of motion adopting Ordinance No. 531.
(a) DISTRICT 6
Consideration of the following actions relative to proposed Ordinance No. 625,An
Ordinance of the Board of Directors of County Sanitation District No. 6 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 625 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion adopting Ordinance No. 625.
(f) DISTRICT7
Consideration of the following actions relative to proposed Ordinance No. 732, An
Ordinance of the Board of Directors of County Sanitation District No. 7 of Orange
County, California. Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 732 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion adopting Ordinance No. 732.
[ITEM (17) CONTINUED ON PAGE 9]
05/24/95
(17) (g) DISTRICT 11 (Continued from page 8)
Consideration of the following actions relative to proposed Ordinance No. 1121,An
Ordinance of the Board of Directors of County Sanitation District No. 11 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 1121 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion adopting Ordinance No. 1121,
(18) DISTRICTS 13& 14
(a) Public hearing relative to the following proposed Ordinances of the Boards of Directors
of County Sanitation Districts Nos. 13 and 14 of Orange county California, Establishing
Excess Capacity Charge Program:
District Ordinance No.
13 1315
14 1407
(1) Open the continued public hearing
(2) Verbal report of General Counsel
(3) Receive and file written comments, if any
(4) Oral public comments, if any
(5) Staff response to comments
(6) Close hearing
(b) DISTRICT 13
Consideration of the following actions relative to proposed Ordinance No. 1315,An
Ordinance of the Board of Directors of County Sanitation District No. 13 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 1315 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion to introduce said Ordinance No. 1315 and pass to
second reading and adoption on June 28, 1995.
(c) DISTRICT 14
Consideration of the following actions relative to proposed Ordinance No. 1407, An
Ordinance of the Board of Directors of County Sanitation District No. 14 of Orange
County, California, Establishing Excess Capacity Charge Program:
(1) Consideration of motion to read Ordinance No. 1407 by title only and waive
reading of said entire ordinance (must be adopted by unanimous vote of
Directors present).
(2) Consideration of motion to introduce said Ordinance No. 1407 and pass to
second reading and adoption on June 28. 1995.
-9-
05/24/95
(19) ALL DISTRICTS
i
j CLOSED SESSION: During the course of conducting the business set forth on i
j this agenda as a regular meeting of the Boards,the Chair may convene the i
i Boards in closed session to consider matters of pending or potential litigation,or
personnel matters,pursuant to Government Code Sections 54956.9.54957 or
54957.6.
I
i Reports relating to(a)purchase and sale of real property; (b)matters of
pending or potential litigation; (c) employment actions or negotiations with '
employee representatives; or which are exempt from public disclosure under i
i the California Public Records Act,may be reviewed by the Boards during a
permitted closed session and are not available for public inspection. At such
time as final actions are taken by the Boards on any of these subjects,the
minutes will reflect all required disclosures of information.
i
(a) Convene in closed session, if necessary
(b) (1) Confer with Districts representatives (Genera)Manager,General Counsel, Director of
Personnel and Director of Finance) concerning status of negotiations with employee
group representatives on salaries, benefits and terns of employment.
(a) Confidential Employees
(2) Confer with Special Counsel R. Craig Scott & Associates re status of litigation, _
Louis Sangermano v. County Sanitation Districts of Orange County.
(3) Confer with Special Counsel David Griffin re status cf litigation, County
Sanitation District No. 3 v. United Technologies Corp., Orange County Superior
Court Case No. 722616
(4) Confer with General Counsel re United States v. Montrose Chemical at al.
(5) Confer with General Counsel re pending litigation: County Sanitation Districts of
Orange County v. Allianz Insurance Company, Inc., Orange County Superior
Court Case No. 736021
(c) Reconvene in regular session
(d) Consideration of action, if any, on matters considered in dosed session
(20) ALL DISTRICTS
Other business and communications or supplemental agenda items, if any
(21) ALL DISTRICTS
Matters which a Director would like staff to report on at a subsequent meeting
-10-
05/24/95
(22) ALL DISTRICTS
Matters which a Director may wish to place on a future agenda for action and staff report
r
(23) DISTRICT 1
Other business and communications or supplemental agenda items, if any
(24) DISTRICT 1
Consideration of motion to adjourn
(25) DISTRICT 2
Other business and communications or supplemental agenda items, if any
(26) DISTRICT 2
Consideration of motion to adjourn
(27) DISTRICT 3
Consideration of the following actions relative to Replacement of Westminster Avenue Force
Main (First Unit) and New Westside Pump Station Force Main, Contract No. 3.36R:
(a) Consideration of motion approving Addendum No. 1 to the plans and specifications for
said project, making miscellaneous technical clarifications.
(b) Consideration of motion approving Addendum No. 2 to the plans and specifications for
said project, changing the date for receipt of bids from April 11, 1995 to April 25, 1995,
and making miscellaneous technical clarifications.
(c) Consideration of Resolution No. 95-55-3, receiving and filing bid tabulation and
recommendation and awarding contract for Replacement of Westminster Avenue Force
Main (First Unit) and New Westside Pump Station Force Main, Contract No. 3-36R, to
Albert W. Davies, Inc. in the total amount of$3,760,000.00.
(28) DISTRICT 3
Other business and communications or supplemental agenda items, if any
(29) DISTRICT 3
Consideration of motion to adjourn
(30) DISTRICT 5
Other business and communications or supplemental agenda items, if any
(31) DISTRICT 5
Consideration of motion to adjourn
(32) DISTRICT
Other business and communications or supplemental agenda items, if any
(33) DISTRICT 6
Consideration of motion to adjourn
-11-
05/24/95
(34) DISTRICT 7
Other business and communications or supplemental agenda items, if any
(35) DISTRICT 7
Consideration of motion to adjourn
(36) DISTRICT 11
Other business and communications or supplemental agenda items, if any
(37) DISTRICT 11
Consideration of motion to adjourn
(38) DISTRICT 13
Other business and communications or supplemental agenda items, if any
(39) DISTRICT 13
Consideration of motion to adjourn
(40) DISTRICT 14
Other business and communications or supplemental agenda items, if any
(41) DISTRICT 14
Consideration of motion to adjourn
...........................................................................................__......_____.........__....___...."'._..._______._—__..__—_
NOTICE TO DIRECTORS: To place items on the agenda for the Regular Meeting of the Joint
i Boards, Directors shall submit items to the Board Secretary not later than the close of business 14
i days preceding the Joint Board meeting. The Board Secretary shall include on the agenda all items
submitted by Directors, the General Manager and General Counsel and all formal communications.
Board Secretary: Penny Kyle (714) 962-2411, exl. 2026
Secretary: Patricia L. Jonk (714) 962-2411, ext. 2029
-12-
aas
COUNTY SANITATION
DISTRICTS NOS. 1, 2, 3, 5, 6, 7, 11 , 13 AND 14
OF
ORANGE COUNTY, CALIFORNIA
MINUTES
JOINT BOARD MEETING
APRIL 26, 1995
..d Np\STRICTS OFo
yQ2 r-`j o
c
a. z
N y
2 K
� a
OTFCT�N��THE ENS\Ppp�
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
ROLL CALL
• A regular meeting of the Boards of Directors of County Sanitation Districts Nos. 1,2, 3. S. 6.
7, 11, 13 and 14 of Orange County, California,was held on April 26. 1995,at 7:30 p.m.,in the
Districts'Administrative Offices. Following the Pledge of Allegiance and invocation the roll was called
and the Secretary mounted a quorum present for Districts Nos. 1.2.3.5.6. 7 and 11 as follows:
ACTNE ALTERNATE
DIRECTORS DIRECTORS
DISTRICT NO. 1: _. For McGuigan, Chair _ Ted R.Moreno
tea— James M.Ferryman.Chair pro tem Annur Perry
• Mark A.Murphy Jeanne Caonts
• Thomas R.SalMrelli _ Jim Pons
1— huger Stanton William G.Steiner
D NU NO.3: 3� Jahn Collins, Chair George Scott
• Dmbl T.Wekn,Clair pro tom John M.Gulkirson
• Berry Dena Bob Bell
_e— Earlier Dur ap Glenn Parker
�L Norman 2.Eckemode Carol Downy
_JL James N.Flora Steve Anderson
Pat McGuigan Ted R.Moreno
J_ Mark A.Murphy Joann Coema
Julie Be Chris Norby
Shmen Singer George L.Elston
$ Roger Stanton Nglum G.Steinr
* Bob Zemel Tom Daly
DISTRICT NO.3: x Sal A.Sepien. Char Narry M.Datwn
* Burnie Dunlap, Chair pro tam Glenn Parker
* Cecilia Age Walter Bowman
J_ George Blown Frank LaMN
* John Collins George Soon
James N.Flora Steve Anderson
y Don R.Griffin Patsy Marshall
Vigor Leip2ig Ralph Bauer
x Walh Lin Eva G.Miner
Pat McGuigan Ted R.Moan
_ Marpia L.Rice Grace Epperson
_ Julie Sa y CIe¢Nomy
v Sheldon Singer George L Mean
Roger Stanton Wllliem G.Steinr
_JL Chades Sylvia Rohn Wehistmm
o Bob Zemel Tom Daly
DISTRICT NO.5: k Jan Delay,Chair John C.Cox,Jr.
._ William G.Steiner.Chair pro from Roger Stamm
John C.Co.,Jr. Jan Delay
DISTRICT NO.B: James M.Fammun,Chair Arthur Perry
Jan Delay.Chair pro is. John C.Co.Jr.
1 William G.Steiner Raper Stamon
DISTRICT NO. 7: 1 Barry Remmond.Chair Mike Ward
• Thomas R. Selfarelb.Chair pro tam _ Jim Potts
• Jan Delay, _ Jom C.Co.Jr.
• James M.Ferryman _ Annur Perry
• Pet MCGuiWn _ Ted R.Moreno
Mark A.Murphy — Joanne Counts
y_ Willi"G.Steiner Roger Stanton
DISTRICT NO. 11: . Victor Laquag,Chair Ralph B.io r
Shirley Defeat.Chair We tam Ralph Bauer
1 Roper Stanton William G. Steiner
DISTRICT NO.13: y John M.Guaiason,Chair Dames T.Watch
Glenn Parker.Chair pro tam 1 Burnie Dunlap
�L Mark A.Murphy Jomu a Coon,
William,G.Steiner Poger Stanton
1 Bob Iemel Tam Daly
DISTRICT M. 14: _,E_ Thomas R.Ssltare111,Chair Jim Pons
y Barry Nammond. Chair pro tNn _ Mike Ward
t Mark A.Murphy _ Joanne Cooma
�r a William G. SMmer _ Roper Stanton
�JL Peer A. Swan _ Darryl Millar
.2.
04/26/95
STAFF MEMBERS PRESENT: Don McIntyre, General Manager, Blake Anderson,
Assistant General Manager, Jean Tappan,
Secretary pro tem, Catherine Biele, John Dettle,
John Finias, Gary Hasenstab, Ed Hodges,
Patricia Jonk, John Linder, Pat McNelly, Mike
Moore, Bob Dolan, Gary Streed, Ed Torres, Paula
Zeller
OTHERS PRESENT: Thomas L. Woodruff, General Counsel,
David Griffin, Bill Knopf, Mary Lee, Craig Scott
DISTRICTS 1. 2 3. 5. 6. 7 & 11 In the absence of the Secretary, Penny Kyle, Joint
Appointment of Secretary Pro tern Chair Cox appointed Jean Tappan Secretary pro
tem.
DISTRICT 13 This 26th day of April, 1995, at 7:30 p.m., being
Adioumment of meeting due to lack of the time and place for the Regular Meeting of the
quorum Board of Directors of County Sanitation District
No. 13 of Orange County, California, and there
not being a quorum present in District No. 13, the meeting of said District was thereupon
adjourned by the Secretary.
DISTRICT 14 This 26th day of April, 1995, at 7:30 p.m., being
Adioumment of meeting due to lack of the time and place for the Regular Meeting of the
Quorum Board of Directors of County Sanitation District
No. 14 of Orange County, California, and there
not being a quorum present in District No. 14, the meeting of said District was thereupon
adjourned by the Secretary.
DISTRICTS 1. 2. 3. 5, 6. 7 & 11 The Joint Chair recognized Director Sheldon Singer
Report of the Joint Chair who expressed his appreciation to the Directors for
their approval of a loan to the Garden Grove
Sanitary District.
Joint Chair Cox then mentioned that a Directors' Orientation and Tour would be held on June 3rd
and June 17th from 9:00 a.m. until 2:00 p.m, and encouraged all Directors to attend.
He then announced the following tentatively scheduled upcoming meetings as follows:
Finance, Administrative and Human Resources Committee-Wednesday,
May 10, 1995, at 5:30 p.m.
Executive Committee - Wednesday, May 17th, at 5:30 p.m.
Operations, Maintenance and Technical Services Committee- Wednesday,
May 3rd, at 5:30 p.m.
Planning, Design and Construction Committee-Thursday, May 4th, at
5:30 p.m.
-3-
04/26/95
�./ DISTRICTS 1. 2. 3. 5. 6. 7 & 11 The Assistant General Manager briefly updated the
Report of Assistant General Manager Directors with regard to the status of the
bankruptcy issue. A hearing is scheduled to be
held with Judge Ryan on May 2, 1995. The balloting with regard to accepting the proposed
comprehensive settlement agreement was completed. All agencies have accepted it. Those
agencies, representing 99% of the money contained in the pool, had chosen Option A. After the
hearing and the final determination made by Judge Ryan, all participants will have an opportunity
to change their option according to their understanding of the final agreement as approved by
Judge Ryan. Mr. Anderson also slated that the County was actively working on the recovery
notes to make them "good as gold"by June 5, 1995.
DISTRICT 1 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995.
and special meetings held March 29, 1995 and
April 12, 1995, the Chair ordered that said minutes be deemed approved, as mailed.
DISTRICT 2 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995,
and special meetings held March 29, 1995 and
April 12, 1995, the Chair ordered that said minutes be deemed approved, as mailed.
DISTRICT 3 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995,
and special meetings held March 29, 1995 and
April 12, 1995, the Chair ordered that said minutes be deemed approved, as mailed.
DISTRICT 5 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995,
and special meetings held March 29, 1995 and
April 11, 1995, the Chair ordered that said minutes be deemed approved, as mailed.
DISTRICT 6 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995,
and special meetings held March 29, 1995 and
April 12, 1995, the Chair ordered that said minutes be deemed approved, as mailed.
DISTRICT 7 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995,
and special meetings held March 29, 1995 and
April 12, 1995, the Chair ordered that said minutes be deemed approved, as mailed.
DISTRICT 11 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995,
and special meetings held March 29, 1995 and
April 12, 1995, the Chair ordered that said minutes be deemed approved, as mailed.
-4-
04/26/95
DISTRICTS 1. 2. 3 S. 6. 7 & 11 Moved, seconded and duly carried:
Ratification of payment of Joint and
Individual District Claims That payment of Joint and individual District claims
set forth on exhibits "A", "B", "C"and "D"attached
hereto
and made a part of these minutes, and summarized below, be, and are hereby, ratified by the
respective Boards in the amounts so indicated.
ALL DISTRICTS
Joint Operating Fund - $1,045,932.70 $544,000.97 $715.812.54 $453,598.66
Capital Outlay Revolving Fund - 245,680.50 484,079.43 477,196.45 831,772.06
Joint Working Capital Fund - 243,761.50 435,30028 152,008.45 306,703.66
Self-Funded Insurance Funds - 15,187.62 30,723.78 43,896.02 9,91620
DISTRICT NO. 1 - 5,096.65 0.00 1,632.89 335.89
DISTRICT NO.2 - 382,424.57 19,974.43 73,971.12 30,292.83
DISTRICT NO.3 - 124,775.50 40,209.57 40,530.29 163,71226
DISTRICT NO.5 - 10,599.16 9,620.45 91,392.19 4,609.44
DISTRICT NO,6 - 271.79 0.00 48.00 238.02
DISTRICT NO.7 - 5.20222 24,807.46 30,745.54 19,574.80
DISTRICT NO. 11 - 504,254.87 907.35 124,433.76 4,184.65
DISTRICTS NOS. 5&6 JOINT - 3,339.80 20,002.50 2,535.10 0.00
DISTRICTS NOS.6&7 JOINT - 2,965.75 453.80 3,134.87 0.00
DISTRICTS NOS.7& 14 JOINT - 7,748.94 691.17 6,659.10 691.17
$2.824.935.58 $1.613.346.19 $2.111.568.57 $1.831.524.42
DISTRICTS 1. 2. 3. 5. 6. 7& 11 Moved, seconded and duly carried:
Awarding Purchase of 12.5% Sodium
Hvpochlorite Solution, Specification No. C-036. That the Boards of Directors hereby adopt Resolution
to Jones Chemicals, Inc. No. 95-33, receiving and filing bid tabulation and
recommendation and awarding contract for Purchase
of 12.5%Sodium Hypochlorite Solution, Specification No. C-036, to Jones Chemicals, Inc., for the
delivered price of$.50 per gallon, plus sales tax, for a one-year period beginning May 14, 1995.
with option for four one-year extensions upon mutually-agreeable terms. Said resolution, by
reference hereto, is hereby made a part of these minutes.
DISTRICTS 1. 2. 3, 5. 6. 7 & 11 Moved, seconded and duly carried:
Anprovina Amendment No. 1 to the contract
for Landscape Maintenance, Specification That the Boards of Directors hereby adopt Resolution
No. M-047 No. 95-34, approving Amendment No. 1 to the
contract for Landscape Maintenance, Specification
No. M-047, to Tropical Plaza Nursery, Inc., and authorizing an increase of$6,216.00, increasing the
authorized annual amount from an amount not to exceed $41,470.00 to an amount not to exceed
$47,868.00. Said resolution, by reference hereto, is hereby made a part of these minutes.
-5-
04/26/95
DISTRICTS 1. 2. 3. 5. 6. 7& 11 Moved, seconded and duly carried:
Awardina contract for Manhole Repair
Services, Specification No. M-049. to That the Boards of Directors hereby adopt Resolution
National Plant Services, Inc. No. 95-35, receiving and filing bids, and awarding the
contract for Manhole Repair Services, Specification
No. M-049, to National Plant Services, Inc., for a two-year period beginning May 1, 1995, for a total
maximum amount not to exceed $400,000.00, with option for one two-year extension upon
mutually-agreeable terms. Said resolution, by reference hereto, is hereby made a pan of these
minutes; and,
FURTHER MOVED: That the bid of Sancon Engineering, Inc., be, and is hereby, rejected for not
meeting the plan specifications.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 Moved, seconded and duly carried:
Authorizing staff to issue Change Order No. 1
to Purchase Order No. 55242 for Telephone That staff be, and is hereby, authorized to issue
System Maintenance Agreement for the Change Order No. 1 to Purchase Order No. 55242,
Districts' telephone PBX and related issued to PacTel Meridian Systems for Telephone
equipment (Specification No. 5-060) System Maintenance Agreement for the Districts'
telephone PBX and related equipment (Specification
No. S-060), to Nortel Communications Systems, with no change in the terms and provisions of the
purchase order contract through the contract period ending August 21, 1995.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 Moved, seconded and duly carried:
Accepting warranty work as complete and
`.i authorizing release of retention funds relative That staff be, and is hereby, authorized to accept
to Job Nos. P1-25: P1-26: P2-32: P2-33 and warranty work as complete and to release retention
P2-34 funds 35 days after filing a Notice of Completion
relative to Supplemental Agreement with
Advanco Constructors, Inc. for Covers for Primary Basins at Plant No. 1, Job No. P1-25; Foul Air
Scrubber System at Plant No. 1, Job No. P1-26; Covers for Primary Basins at Plant No. 2, Job
No. P2-32; Foul Air Scrubber System at Plant No. 2, Job No. P2-33; and Improvements to Grit
Facility"B", Billings Tunnel and Distribution Structure "A", Job No. P2-34.
-6-
04/26/95
DISTRICTS 1 2 3 5 6 7 & 11 Moved, seconded and duly carried: �1
Receive and file Summons and Complaint
for Inverse Condemnation re Santa Ana River That the following Summons and Complaint for
widenina project with the County of Orange Inverse Condemnation in connection with the Santa
Ana River widening project with the County of Orange
be, and are hereby, received and ordered filed:
Name OCSC Case No.
Steven and Carol McCray 740633
Mark Roeder and Katherine Yamall 740634
Gilbert G. and Margaret A. Caruso 740635
Young C. and Kyong-Ja Kim 740636
and,
FURTHER MOVED: That the Districts' General Counsel be, and is hereby, authorized to appear
and defend the interests of the Districts.
DISTRICTS 1. 2 3 S. 6. 7 & 11 Moved, seconded and duly carried:
Receive and file draft minutes of the
Operations Maintenance and Technical That the draft minutes of the Operations, Maintenance
Services Committee and Technical Services Committee meetings held on
March 1, 1995 and April 5, 1995, be, and are hereby,
received and ordered filed.
DISTRICTS 1. 2. 3. 5. 6 . 7 & 11 Moved, seconded and duly carried:
Receive and file draft minutes of the
Planning. Design and Construction That the draft minutes of the Planning, Design and
Committee Construction Committee meetings held on March 2,
1995 and April 6, 1995, be, and are hereby, received
and ordered filed.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 Moved, seconded and duly carried:
Receive and file draft minutes of the Steering
Committee That the draft minutes of the Steering Committee
meeting held on March 8, 1995, be, and are hereby,
received and ordered filed.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 Moved, seconded and duly carried:
Receive and file draft minutes of the
Finance. Administrative and Human That the draft minutes of the Finance, Administrative
Resources Committee and Human Resources Committee meetings held on
March 15, 1995 and April 12, 1996 be, and are
hereby, received and ordered filed.
V
-7-
04/26/95
V DISTRICTS 1. 2. 3. 5. 6. 7 & 11 Moved, seconded and duly carried:
Receive and file draft minutes of the
Executive Committee That the draft minutes of the Executive Committee
meeting held on April 19, 1996, be, and are hereby,
received and ordered filed.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 Moved, seconded and duly carried:
(OMTS95-014)
Authorizing staff to issue a purchase order That staff be, and is hereby, authorized to issue a
to O'Brien Enemy Systems to Automate Two purchase order to O'Brien Energy Systems to
Trailer-Mounted Emergency Generators Automate Two Trailer-Mounted Emergency
(Specification No. M-053): and Place Standby Generators (Specification No. M-053) in the amount of
Power and Reliability Modification. Job $37,015.00, plus applicable sales tax; and,
No. J-33. on the Critical Capital Projects List
FURTHER MOVED: That Standby Power and
Reliability Modification, Job No. J-33, be placed back on the Critical Capital Projects List.
DISTRICTS 1. 2. 15. 6. 7& 11 Moved, seconded and duly carried:
(OMTS95-017)
Authorizing staff to enter into agreement with That staff be, and is hereby, authorized to enter into
the US Corps of Engineers re transfer of an agreement with the US Corps of Engineers,
Emission Reduction Credits (ERCs) temporarily transferring Emission Reduction Credits
(ERCs), in forth approved by General Counsel.
DISTRICTS 1, 2. 3. 5. 6. 7 & 11 Moved, seconded and duly carried:
�..✓ (PDC95-12)
Aoprovina Change Order No. 4 to the Plans That Change Order No. 4 to the plans and
and specifications for Job Nos. P1-36-1: specifications for Electrification of Pump Drives at
P1-38-1: 1?1-38-4: and P2-43-3 Treatment Plant No. 1, Job No. P1-36-1; Security and
Landscaping Element of Miscellaneous Improvements
to Facilities at Plant No. 1, Job No. P1-38-1; Miscellaneous Improvements to Facilities at Plant
No. 1,Job No. P1-38-4; and Miscellaneous Improvements to Facilities at Treatment Plant No. 2,
Job No. 132-43.3, authorizing a net addition of$56,227.00 to the contract with Advanco
Constructors, Inc., Division of Zum Constructors, Inc., for six items of additional or deleted work,
and granting a time extension of six calendar days for completion of said additional work, be, and
is hereby, approved.
DISTRICTS 1. 2 3 5 6 7& 11 Moved, seconded and duly carried:
(PDC95-13)
Approving Change Order No 5 to the plans That Change Order No. 5 to the plans and
and specifications for Job No P1-38-2 specifications for Priority Projects Element of
Miscellaneous Improvements to Facilities at Plant
No. 1, Job No. P1-38-2, authorizing a net deduction of$25,145.00 from the contract with Pascal &
Ludwig Engineers for six items of additional or deleted work, be, and is hereby, approved.
./
-8-
04/26/95
DISTRICTS 1 2 3 5 6 7 & 11 (PDC95-08) Moved, seconded and duly carried:
Approving Addendum No 3 to the
Professional Services Agreement with John That the Planning, Design and Construction
Carollo Enaineers re Job Nos P1-36 and Committee certification of the final negotiated fee
P2-42 relative to Addendum No. 3 to the Professional
Services Agreement with John Carollo Engineers
for design and construction services, preparation of operations and maintenance manuals, and
training services re Secondary Treatment Improvements at Plant No. 1, Job No. P1-36, and
Secondary Treatment Expansion at Plant No. 2, Job No. P2-42, providing for additional design
services and construction support services, be, and is hereby, received and ordered filed; and,
FURTHER MOVED: That the Boards of Directors hereby adopt Resolution No. 95-36, approving
Addendum No. 3 to said agreement with John Carollo Engineers for said additional services, on an
hourly-rate basis for labor plus overhead, plus direct expenses and fixed profit, for an additional
amount not to exceed $407,397.00, increasing the total authorized compensation from an amount
not to exceed $5,481,753.00 to an amount not to exceed $5,889,150.00. Said resolution, by
reference hereto, is hereby made a part of these minutes.
DISTRICTS 1. 2 3 5 6. 7& 11 (PDC95-09) Moved, seconded and duly carried:
Aoorovina Addendum No. 4 to the Professional
Services Aareement with CH2M Hill. Inc. re That the Planning, Design and Construction
Job No. J-31 committee certification of the final negotiated fee
relative to Addendum No. 4 to the Professional
Services Agreement with CH2M Hill, Inc., for design and programming services required for
Expansion of Existing Computerized Monitoring and Control Systems at Plants 1 and 2,
Job No. J-31, providing for additional design services, be, and is hereby, received, ordered filed,
and approved; and,
FURTHER MOVED: That the Boards of Directors hereby adopt Resolution No. 95-37, approving
Addendum No. 4 to said agreement with CH2M Hill, Inc. for said additional services, on an hourly
rate basis for labor plus overhead, plus direct expenses, subconsultant fees and fixed profit, for an
additional amount not to exceed $57,180.00, increasing the total authorized compensation from
$2,060,348.00 to an amount not to exceed $2,117,528.00. Said resolution, by reference hereto, is
hereby made a part of these minutes.
DISTRICTS 1. 2. 3. 5. 6. 7 & 11 (PDC95.10) Moved, seconded and duly carried:
Approving Addendum No. 1 to the
Professional Services Agreement with That the Planning, Design and Construction
Brown and Caldwell Consulting Committee certification of the final negotiated fee
Engineers re Job No. P1-37 relative to Addendum No. 1 to the Professional
Services Agreement with Brown and Caldwell
Consulting Engineers for permitting, design and construction support services, preparation of
operation and maintenance manuals, and training services re Primary Clarifiers 16-27 and Related
Facilities at Plant No. 1, Job No. P1-37, providing for changes and deletions to the original scope
of work, be, and is hereby, received, ordered filed and approved; and,
FURTHER MOVED: That the Boards of Directors hereby adopt Resolution No. 9538, approving
Addendum No. 1 to said agreement with Brown and Caldwell Consulting Engineers for said
additional services, on an hourly rate basis for labor plus overhead, direct expenses, subconsultant v
-9-
04/26/95
fees and fixed profit for an additional amount not to exceed $538,330.00, increasing the total
authorized compensation from $1,468,400.00 to an amount not to exceed $2,006,730.00. Said
resolution, by reference hereto, is hereby made a part of these minutes.
DISTRICTS 1. 2, 3. 5. 6. 7& 11 (PDC95-11) Moved, seconded and duly carried:
Approving Addendum No. 2 to the Professional
Services Aareement with Black&Veatch re That the Planning, Design and Construction
Job Nos. Pl-46 and P2-55 Committee certification of the final negotiated fee
relative to Addendum No. 2 to the Professional
Services Agreement with Black & Veatch for engineering evaluation and design and construction
support services required for Chemical and Wastehauler Facility Modifications at Plant No. 1, Job
No. P1-46, and Chemical and Plant Water Facility Modifications at Plant No. 2, Job No. P2-55,
providing for additional design services, be, and is hereby, received, ordered filed and approved;
and,
FURTHER MOVED: That the Boards of Directors hereby adopt Resolution No. 95-39, approving
Addendum No. 2 to said agreement with Black&Veatch for said additional services, on an hourly-
rate basis for labor plus overhead, direct expenses and fixed profit for an additional amount not to
exceed $282,700.00, increasing the total authorized compensation from $390,815.00 to an amount
not to exceed $673,515.00. Said resolution, by reference hereto, is hereby made a part of these
minutes.
DISTRICTS 1, 2, 3, 5. 6. 7& 11 (PDC95-15) Moved, seconded and duly carried:
Authorizing staff to issue purchase orders to
vendors re Emergency Repairs of the Ocean That staff be, and is hereby, authorized to issue
�..� Outfall Flap Gate (Specification No. M-054) purchase orders to vendors for services rendered re
Emergency Repairs of the Ocean Outfall Flap Gate
(Specification No. M-054), in a total amount not to exceed $175,000.00.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 (FPC95-17) Moved, seconded and duly carried:
Authorizina staff to renew Excess Workers'
Compensation Insurance with the California That staff be, and is hereby, authorized to renew
Municipal Excess Workers' Compensation Excess Workers' Compensation Insurance for the
(CAMEX) Program period May 1, 1995 to May 1, 1996, with the California
Municipal Excess Workers' Compensation (CAMEX)
Program in an amount not to exceed $29,000.00.
-10-
04/26/95
DISTRICTS 1 2 3 5 6 7 & 11 (FPC95-14)
Actions re Continued Monitoring of Variable
Rate Certificates of Participation (COPS)
Authorizing staff to remove Merrill Moved, seconded and duly carried:
Lynch as Remarketina Agent for Series
"A" "C"and 1993 Refunding COPS That staff be, and is hereby, authorized to remove
Merrill Lynch as Remarketing Agent for Series"A",
Series"C" and 1993 Refunding Certificates of Participation.
Appointing PaineWebber as Moved, seconded and duly carried:
Remarketing Agent for Series "A"
COPS That PaineWebber be, and is hereby, appointed as
Remarketing Agent for Series "A" Certificates of
Participation; and,
FURTHER MOVED: That staff be, and is hereby, authorized to negotiate fees with
PaineWebber for said services.
Authorizing negotiations with J. P. Moved, seconded and duly carried:
Morgan as Remarketing Agent for
Series "C" COPs That staff be, and is hereby, authorized to negotiate
with J. P. Morgan as Remarketing Agent for Series "C"
Certificates of Participation.
Authorizing staff to negotiate with Moved, seconded and duly carried:
PaineWebber to serve as Remarketing
Agent for 1993 Refunding COPS That the Remarketing Agent on the 1993 Refunding
COPS be, and is hereby, replaced; and,
FURTHER MOVED: That staff be, and is hereby, authorized to negotiate with
PaineWebber to serve as Remarketing Agent for 1993 Refunding COPS.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 (FAHR95-22) Moved, seconded and duly carried:
Dedarino that the 1995-96 Sewer Use Fees
remain unchanged from the 1994-95 rates. That the Boards of Directors hereby declare that the
and allowing the Connection Fees/Capital 1995-96 Sewer Use Fees remain unchanged from the
Facilities Connection Charges to increase 1994-95 rates; and,
FURTHER MOVED: That the Connection Fees/Capital Facilities Connection Charges be, and are
hereby, allowed to increase in accordance with the Engineering News Record—Los Angeles
Construction Cost Index, pursuant to the adopted resolutions.
DISTRICTS 1. 2. 3. S. 6. 7& 11 (FAHR95-23) Moved, seconded and duly carried:
Adopting Revisions to the Personal
Responsibility in Daily Effort (PRIDE) Program That the Boards of Directors hereby adopt Resolution
No. 95.40, Adopting Revisions to the Personal
Responsibility in Daily Effort (PRIDE) Program. Said resolution, by reference hereto, is hereby
made a part of these minutes.
-11-
04/26/95
DISTRICTS 1. 2. 3. 5. 6. 7 & 11 The Director of Technical Services briefly reported
Actions re Siosolids Management Agreements that staff mailed requests for proposals for diversifying
our contracts and trying to reduce costs. Currently,
the Districts have two contractors, AgTech and Pima Gro, that handle the bulk of the Districts' biosolids.
After evaluation of the proposals, he reported that staff is recommending two additional contractors be
added which should decrease overall costs at an estimated annual savings of$350,000.00.
Approving agreement with Bio Gro Moved, seconded and duly carried:
Systems. Inc.
That the agreement with Bio Gro Systems, Inc. for a
five-year period, to transport and manage approximately 1,000 tons of biosolids per week,
at a cost of approximately$27.12 per wet ton, be, and is hereby, approved.
Approving aoreement with Hondo. Inc. Moved, seconded and duly carried:
That the agreement with Hondo, Inc. for a five-year period, to transport and manage
approximately 500 tons of biosolids per week, at a cost of approximately$21.50 per wet
ton, be, and is hereby, approved.
DISTRICTS 1. 2. 3. S. 6. 7& 11
Actions re first reading and public hearing of
proposed ordinances Establishing Excess
Capacity Charge Program
Public Hearing The Joint Chair announced that this was the time and
`.,.i place fixed by the Boards of Directors of County
Sanitation Districts Nos. 1, 2, 3, 5, 6, 7 and 11 for the public hearing on the following
proposed Ordinances Establishing Excess Capacity Charge Program:
District Ordinance No.
1 125
2 219
3 322
5 531
6 625
7 732
11 1121
Open Public Hearing The Chair declared the hearing open at 7:45 p.m.
Verbal report of General Counsel The Districts' General Counsel reported that the
proposed ordinances had been initially introduced on
behalf of all Districts at the last meeting of the joint boards. At that time, the Operations,
Maintenance and Technical Services and the Finance Committees had not completed their
review of staff recommendations. With that review completed, the General Counsel noted
that the result was a substantive change in the ordinance which would require another first
reading of the ordinance.
...
-12-
04/26/95
Close hearing There being no public comments, the Chair declared
the hearing closed at 7:47 p.m.
DISTRICT 1
Actions re first reading and introduction of
proposed Ordinance No, 125
First readina of proposed Moved, seconded and duly carried by
Ordinance No 125 unanimous vote:
That proposed Ordinance No. 125, An Ordinance of the Boards of Directors of County
Sanitation District No. 1 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 125 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 125, An Ordinance of the Boards of Directors of County Sanitation
District No. 1 of Orange County, California, Establishing Excess Capacity Charge Program,
be introduced and passed to second reading and adoption on May 24, 1995.
DISTRICT 2
Actions re first reading and introduction of
Proposed Ordinance No. 219
Fist reading of proposed Moved, seconded and duly carried by unanimous
Ordinance No. 219 vote:
That proposed Ordinance No. 219, An Ordinance of the Boards of Directors of County
Sanitation District No. 2 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 219 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 219, An Ordinance of the Boards of Directors of County Sanitation
District No. 2 of Orange County, California, Establishing Excess Capacity Charge Program,
be introduced and passed to second reading and adoption on May 24, 1995.
-13-
04nsi95
�../ DISTRICT 3
Actions re first readina and introduction of
Proposed Ordinance No. 322
First reading of Proposed Moved, seconded and duly carried by unanimous
Ordinance No. 322 vote:
That proposed Ordinance No. 322, An Ordinance of the Boards of Directors of County
Sanitation District No. 3 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 322 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 322, An Ordinance of the Boards of Directors of County Sanitation
District No. 3 of Orange County, California, Establishing Excess Capacity Charge Program,
be introduced and passed to second reading and adoption on May 24, 1995.
DISTRICT 5
Actions re first reading and introduction of
proposed Ordinance No. 531
First reading of proposed Moved, seconded and duly carried by
Ordinance No. 531 unanimous vote:
That proposed Ordinance No. 531, An Ordinance of the Boards of Directors of County
Sanitation District No. 5 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 531 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 531, An Ordinance of the Boards of Directors of County Sanitation
District No. 5 of Orange County, California, Establishing Excess Capacity Charge Program,
be introduced and passed to second reading and adoption on May 24, 1995.
...
-14-
04/26/95
DISTRICT 6 �l
Actions re first reading and introduction of
proposed Ordinance No. 625
First reading of proposed Moved, seconded and duly carried by unanimous
Ordinance No 625 vote:
That proposed Ordinance No. 625, An Ordinance of the Boards of Directors of County
Sanitation District No. 6 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 625 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 625, An Ordinance of the Boards of Directors of County Sanitation
District No. 6 of Orange County, California, Establishing Excess Capacity Charge Program,
be introduced and passed to second reading and adoption on May 24, 1995.
DISTRICT 7
Actions re first reading and introduction of
proposed Ordinance No, 732
First reading of proposed Moved, seconded and duly carried by unanimous
Ordinance No. 732 vote:
That proposed Ordinance No. 732, An Ordinance of the Boards of Directors of County
Sanitation District No. 7 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 732 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 732, An Ordinance of the Boards of Directors of County Sanitation
District No. 7 of Orange County, California, Establishing Excess Capacity Charge Program,
be introduced and passed to second reading and adoption on May 24, 1995.
-15-
04/26/95
�..J DISTRICT 11
Actions re first reading and introduction of
proposed Ordinance No. 1121
First readina of proposed Moved, seconded and duly carried by unanimous
Ordinance No. 1121 vote:
That proposed Ordinance No. 1121, An Ordinance of the Boards of Directors of County
Sanitation District No. 11 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 1121 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 1121, An Ordinance of the Boards of Directors of County Sanitation
District No. 11 of Orange County, California, Establishing Excess Capacity Charge
Program, be introduced and passed to second reading and adoption on May 24, 1995.
DISTRICTS 1. 2. 3. 5. 6. 7& 11 General Counsel reported to the Directors the need
General Counsel's Comments Prior to Closed for a closed session as authorized by Government
Session - Code Sections 54956.9 and 54957.6 to discuss and
consider the items that are specified as
Items 15(b)(1), (2), (3) and (4) on the published Agenda. No other items would be discussed or
acted upon.
DISTRICTS 1. 2. 3. 5, 6. 7& 11 Moved, seconded and duly carded:
Convene in closed session pursuant to
Government Code Sections 54956.9 The Boards convened in closed session at 7:55 p.m.
and 54957.6 pursuant to Government Code Sections 54956.9 and
54957.6. Confidential Minutes of the Closed Session
held by the Board(s) of Directors have been prepared in accordance with California Government
Code Section 54957.2 and are maintained by the Board Secretary in the Official Book of
Confidential Minutes of Board and Committee Closed Meetings. No actions were taken re Agenda
Items (15)(b)(1), (2), (3) and (4).
DISTRICTS 1 2. 5 6 7 & 11 At 8:45 p.m., the Boards reconvened in regular
Reconvene in regular session session.
DISTRICT 1 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of County
Sanitation District No. 1 be adjourned. The Chair then declared the meeting so adjourned at
8:45 p.m.
..
-16-
04/26/95
DISTRICT 2 Moved, seconded and duly carried:
Approving Permit Agreement with the City of
Anaheim That the Permit Agreement with the City of Anaheim
for the discharge of wastewater containing suspended
solids from Anaheim's Lenain Filtration Plant to District No. 2, be, and is hereby, approved; and,
FURTHER MOVED: That a one-time excess capacity charge fee of$165,028.09, be, and is
hereby, authorized.
DISTRICT 2 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of Directors of County
Sanitation District No. 2 be adjourned. The Chair then declared the meeting so adjourned at
8:45 p.m.
DISTRICT 5 Moved, seconded and duly carried:
Authorizing a short-term loan to the Garden
Grove Sanitary District That the Board of Directors hereby adopts Resolution
No. 95-32, authorizing a short-term loan to the Garden
Grove Sanitary District to prevent their loan default arising from the Orange County bankruptcy.
Said resolution, by reference hereto, is hereby made a part of these minutes.
DISTRICT 5 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of County
Sanitation District No. 5 be adjourned. The Chair then declared the meeting so adjourned at
8:45 p.m.
DISTRICTS 6 8 7 Moved, seconded and duly carried:
Approving Change Order No. 1 to the plans
and specifications for Contract No. 14-1-1A That Change Order No. 1 to the plans and
specifications for Baker-Gisler Interceptor,from
Fairview Road to Plant No. 1, Contract No. 14-1-1A, for an addition of$33,676.16 to the contract
with Mladen Bunlich Construction Co., Inc. for twelve items of additional work, and granting a time
extension of two calendar days for completion of said additional work, be, and is hereby, approved.
DISTRICT 6 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of County
Sanitation District No. 6 be adjourned. The Chair then declared the meeting so adjourned at
8:45 p.m.
V
-17-
04/26/95
DISTRICT 7
Actions re Contract Nos. 7-22 and 7-24
Approvino Plans and specifications re Moved, seconded and duly carried:
Contract Nos. 7-22 and 7-24
That the Board of Directors hereby adopts Resolution
No. 95-41-7, approving plans and specifications for Parallel and Replacement of Portions of
Lemon Heights Subtrunk Sewer, La Colina Drive to Newport Boulevard, Contract No. 7-22,
and Manhole Access Modifications to RA-14 Sewer at Newport Boulevard at Cowan
Heights Drive, Contract No. 7-24, and authorizing the General Manager to establish the
date for receipt of bids. Said resolution, by reference hereto, is hereby made a part of
these minutes.
Approving Reimbursement Agreement Moved, seconded and duly carried:
with Margaret M. Lovig
That the Board of Directors hereby adopts Resolution
No. 9542-7, approving Reimbursement Agreement with Margaret M. Lovig for construction
of a sewer lateral relative to Parallel and Replacement of Portions of Lemon Heights
Subtrunk Sewer, La Colina Drive to Newport Boulevard, Contract No. 7-22, and Manhole
Access Modifications to RA-14 Sewer at Newport Boulevard at Cowan Heights Drive,
Contract No. 7-24, and that the General Manager, be, and is hereby, authorized to execute
said agreement, in form approved by General Counsel. Said resolution, by reference
hereto, is hereby made a part of these minutes.
Approving Reimbursement Agreement Moved, seconded and duly carried:
`..� with Raymond Magaro
That the Board of Directors hereby adopts Resolution
No. 95-43-7, approving Reimbursement Agreement with Raymond Magaro for construction
of a sewer lateral relative to Parallel and Replacement of Portions of Lemon Heights
Subtrunk Sewer, La Colina Drive to Newport Boulevard, Contract No. 7-22, and Manhole
Access Modifications to RA-14 Sewer at Newport Boulevard at Cowan Heights Drive,
Contract No. 7-24, and that the General Manager, be, and is hereby, authorized to execute
said agreement, in forth approved by General Counsel. Said resolution, by reference
hereto, is hereby made a part of these minutes.
Approving Reimbursement Agreement Moved, seconded and duly carried:
with Hazel Neville
That the Board of Directors hereby adopts Resolution
No. 95-44-7, approving Reimbursement Agreement with Hazel Neville for construction of a
sewer lateral relative to Parallel and Replacement of Portions of Lemon Heights Subtrunk
Sewer, La Colina Drive to Newport Boulevard, Contract No. 7-22, and Manhole Access
Modifications to RA-14 Sewer at Newport Boulevard at Cowan Heights Drive, Contract
No. 7-24, and that the General Manager, be, and is hereby, authorized to execute said
agreement, in forth approved by General Counsel. Said resolution, by reference hereto, is
hereby made a part of these minutes.
04/26/95
Approving Reimbursement Agreement Moved, seconded and duly carried:
with Glenn Riley
That the Board of Directors hereby adopts Resolution
No. 9545-7, approving Reimbursement Agreement with Glenn Riley for construction of a
sewer lateral relative to Parallel and Replacement of Portions of Lemon Heights Subtrunk
Sewer, La Colina Drive to Newport Boulevard, Contract No. 7-22, and Manhole Access
Modifications to RA-14 Sewer at Newport Boulevard at Cowan Heights Drive, Contract
No. 7-24, and that the General Manager, be, and is hereby, authorized to execute said
agreement, in form approved by General Counsel. Said resolution, by reference hereto, is
hereby made a part of these minutes.
DISTRICT 7 Moved, seconded and duly carried:
Receive and file request for annexation and
authorizing initiation proceedings re proposed That the request from Oswald and Zlata M. Kendler
Annexation No 142 - Kendler Annexation for annexation of 1.28 acres of territory to the District,
in the vicinity southeast of the intersection of Orange
Park Boulevard and Clark Street in unincorporated County territory, be, and is hereby, received
and ordered filed; and,
FURTHER MOVED: That the Board of Directors hereby adopts Resolution No. 95-46-7,
authorizing initiation of proceedings to annex said territory to the District(proposed Annexation
No. 142 - Kendler Annexation to County Sanitation District No. 7). Said resolution, by reference
hereto, is hereby made a part of these minutes.
DISTRICT 7 Moved, seconded and duly carried:
Orderino Annexation No. 144- Pomeroy
Annexation That the Board of Directors hereby adopts Resolution
No. 95-47-7, ordering annexation of 1.44 acres of
territory to the District, in the vicinity north of the intersection of Lemon Heights Drive and Foothill
Boulevard in unincorporated County territory(Annexation No. 144- Pomeroy Annexation to County
Sanitation District No. 7). Said resolution, by reference hereto, is hereby made a part of these
minutes.
DISTRICT 7 Moved, seconded and duly carried:
Awarding Abandonment of Bent Tree. Cowan
Heights, Derby Nos. 1 and 2. Lake Court and That the Board of Directors hereby adopts Resolution
Shady Canyon Pump Stations, Contract No. 95-48-7, receiving and filing bid tabulation and
No. 7-14-2 to Clarke Contracting Corporation recommendation and awarding contract for
Abandonment of Bent Tree, Cowan Heights, Derby
Nos. 1 and 2, Lake Court and Shady Canyon Pump Stations, Contract No. 7-14-2, to Clarke
Contracting Corporation, in the total amount of$557,117.25. Said resolutions, by reference
hereto, is hereby made a part of these minutes.
DISTRICT 7 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of County
Sanitation District No. 7 be adjourned. The Chair then declared the meeting so adjourned at
8:45 p.m.
-19-
04/26/95
DISTRICT 11 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of County
Sanitation District No. 11 be adjourned. The Chair then declared the meeting so adjourned at
8:45 p.m.
DISTRICT 3 At 9:20 p.m., the Board recovened in regular session.
Reconvene in regular session
DISTRICT 3 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of County
Sanitation District No. 3 be adjourned. The Chair then declared the meeting so adjourned at
9:20 p.m.
Secretary of th oatf Directors
of County Sani Lion ricts
No. 1, 2, 3, 5, 6, 7, 11, 13 and 14
..
-20-
FUND NO 91% JT DIST WORKING CAPITAL PROCESSING DATE 03/07/95 PAGE
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 03/08/95 POSTING DATE 03MIS5
WARRANT NO. VENDOR AMOUNT DESCRIPTION
143377 ABM BUSINESS MACHINES $809.60 SERVICES AGREEMENT
143378 AG TECH COMPANY $114,795.05 RESIDUALS REMOVAL M.0.10-9-91
143379 ATM AA,INC. $3,710,00 LAB SERVICES
143300 AT&T-MEGACOM SERVICE $965A2 LONG DISTANCE TELEPHONE SERVICES
143351 AT&T-PROWATTS S4S9 LONG DISTANCE TELEPHONE SERVICES
143382 ABRASIVE ENG.TOOL&EQUIP. $324.22 HARDWARE
143383 ADAMSON INDUSTRIES $851 B3 LAB SUPPLIES
143384 AIR PRODUCTS&CHEMICALS,INC. $36,074A0 O&M AGREEMENT OXYGEN.SYST.M.O.8-9-89
143385 ALLIED SUPPLY CO. $13.79 FREIGHT
143388 ALPI INDUSTRIES $402.56 PLUMBING SUPPLIES
143381 SLAKE P.ANDERSON $&88.34 REIMBURSE CELLULAR TELEPHONE
143388 ANIXTER-DISTRIBUTION S410.14 ELECTRIC SUPPLIES
143389 A-PLUS SYSTEMS $1,7W.80 NOTICES&ADS
m 143390 APPLIED SIOSYSTEMS.INC. $489.00 LAB SUPPLIES
>< 143391 ARAMARK SERVICES,INC. $202.03 SAFETY SUPPLIES
5
�-+ 14339 ARROWHEAD ELECTRIC CORP. $ 7 . ELECTRIC SUPPLIES
� 1/7793 ASSOCIATED CONCRETE PRODUCTS $174.5656 BUILDING MATERIALS
y 14MN BKK LANDFILL $2,888.W RESIDUALS REMOVAL M.0.10.Ml
> 143395 BADGER METER,INC. $133.92 FREIGHT
143398 BATTERY SPECIALTIES $1,527.57 BATTERIES
143397 FERNANDO BAUTISTA $2,232.50 REFUND CONNECTION FEE
143398 BAXTER DIAGNOSTICS,INC. $3.778.15 LAB SUPPUES
143399 BEACON BAY ENTERPRISES,INC. $148,65 TRUCK WASH TICKETS
143400 BENZ ENGINEERING.INC. $395.24 COMPRESSOR PARTS
143401 810 TECH NET.INC. $18.20 COMPUTER SOFTWARE
143402 BOERINGER MANNHEIM $1,495.02 LAB SUPPLIES
143403 BOYLE ENGINEERING CORP. $12.651.90 ENGINEERING SERVICES 3.38
143404 BROWN&CALDWELL CONSULTANTS $24.817.50 ENGINEERING SERVICES J-19
143405 BUDGET JANITORIAL $3,130.00 JANITORIAL SERVICES
143406 BUSH&ASSOCIATES,INC. $384.00 SURVEYING SERVICES M.0.848-94
143407 CEM CORPORATION $272.13 LAB SUPPLIES
143408 CH2M HILL $73.081.00 ENGINEERING SERVICES J-31
143409 C.L.TECHNOLOGY $540.W GAS ANALYSIS SERVICES
14341D CANUS CORPORATION $24,930.W FIBRE OPTIC SYST.-CENT.GEN.
143411 JOHN CAROLLO ENGINEERS $11.187.91 ENGINEERING SERVICES PI-38
143412 CASHCO,INC. $131.44 PLUMBING SUPPLIES
143013 CENTURY PAINT $800.20 PAINT SUPPLIES
143414 CENTURY SAFETY INST.&SUPPLY $609.18 SAFETY SUPPLIES
14MIS CERFNET $55.21 COMPUTER SERVICES
143416 COAST RUBBER STAMP S42.02 OFFICE SUPPLIES
143417 COLE-PALMER INSTRUMENT 00. $343.23 INSTRUMENTS
143418 COLICH AND SONS $368.476.39 CONSTRUCTION 24R-1
143419 COLICH&SONS $490.367.51 CONSTRUCTION 11-17-1
143420 CONTINENTAL AIR TOOLS INC. S234A4 TOOLS
143421 COOPER INDUSTRIES,INC. $2,074.03 ENGINE PARTS
143422 COUNTERPART ENTERPRISES $1.293.80 MECHANICAL SUPPLIES
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 03107M5 PAGE 2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0310SM5 POSTING DATE 03/08/95
WARRANTNO. VENDOR AMOUNT
143423 COUNTY WHOLESALE ELECTRIC $264.96 ELECTRIC PARTS
143424 DAWES TRANSPORT,INC. $122.57 FREIGHT
143425 DICKSONS $913.72 AIR CONDITIONERS
143426 DIGITAL EQUIPMENT CORP. $24.714.18 COMPUTER SOFTWARE
143427 DOMAR ELECTRIC,INC. $1.285.00 ELECTRIC SUPPLIES
143426 DOVER ELEVATOR COMPANY $940.00 ELEVATOR MAINTENANCE
143429 DUNN EDWARDS CORP. $272.82 PAINT SUPPLIES
143430 ESP NORTH $459.61 MECHANICAL SUPPLIES
143431 EASTMAN,INC. $2,141.22 OFFICE SUPPLIES
143432 EDWARDS DIV.OF GS BLDG SYS. $1.711.72 SAFETY SUPPLIES
143433 ELECTRO NUMERICS.INC. $267.34 INSTRUMENT PARTS
143434 ENCHANTER,INC. $4,480.00 OCEAN MONITORING M.O.6-10-92
K 143435 ERNST&YOUNG $3,028DO REVIEW OF HUMAN RESOURCES-M.O.9I1 W
x 143436 EXECUTIVE SOFTWARE $6.871.21 COMPUTER SOFTWARE
^i 143437 FMC CORP. $59.337.21 CHEMICALS
H 143438 FALCON DISPOSAL SERVICE $7,666.00 RESIDUALS REMOVAL M.O.10-9-91
r9 143439 FEDERAL EXPRESS CORP. $311.75 AIR FREIGHT
y 143 10 FILTER SUPPLY CO. $34.09 FILTERS
I 14WI FISHER SCIENTIFIC CO. $404.33 LAB SUPPLIES
^° 143442 FLUORAMICS.INC. $312.42 CHLORINATION SUPPLIES
143443 FRANCE COMPRESSOR PRODUCTS $178.92 MECHANICAL PARTS
143444 FRAZEE PAINT&WALLCOVERING $166.56 PAINT SUPPLIES
143445 DST,INC. $5,2W 49 OFFICE EQUIPMENT
143446 GARRATT-CALLAHAN COMPANY $2,WBS4 CHEMICALS
143447 CATES FIBERGLASS INSTALLERS $915.50 PLUMBING SUPPLI ES
143 18 GENERAL OCEANIGS,INC. $436.50 LAB SUPPLIES
14W9 GENERAL TELEPHONE CO. $260.20 TELEPHONE SERVICES
143450 GENICOM CORPORATION $839.00 SERVICE AGREEMENT
143451 GIERUCH-MRCHELL,INC. $6,991.76 PUMP PARTS
143452 GLOBAL COMPUTER SUPPLIES $71.27 COMPUTER PARTS
143453 GOVERNMENT INSTITUTES,INC. $108.00 PUBLICATION
143454 GRAHAM MANUFACTURING CO.,INC. $112.14 MECHANICAL PARTS
143455 WW GRAINGER,INC. $14949 TRUCK PARTS
143466 GRAPHIC DISTRIBUTORS $208.82 PHOTOGRAPHIC SUPPLIES
143457 GRASSY S.T.I. $4.239.02 INSTRUMENT SUPPLIES
143458 GOA CONSULTANTS $9.800.00 SURVEYING SERVICES M.O.6.8-94
143459 DAVID R.GRIFFIN $37,141.93 LEGAL SERVICES-TECHITE PIPE M.O.9-1 9M
143460 DAVID M.GRIFFITH&ASSOC. $7,841.93 PROF.SERVICES-EXEC.SEARCH
143461 HACH COMPANY $1,958.38 LAB SUPPLIES
143462 HARBOUR ENGINEERING $10.454.55 PUMP PARTS
143463 HARRINGTON INDUSTRIAL PLASTIC $192.09 FITTINGS
143464 PL HAWN CO,INC. 59,202.31 ELECTRIC SUPPLIES
143465 EG HELLERS SON.INC. $29.22 MECHANICAL PARTS
143/SS HOERBIGER CVS CALIF..INC. $1,222.27 MECHANICAL PARTS
143467 RS HUGHES CO.,INC. $3,114.22 SAFETY SUPPLIES
143468 CITY OF HUNTINGTON BEACH $13,764.75 WATER USE (`
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 03/0795 PAGE 3
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0398/95 POSTING DATE 0310895
WARRANT NO. VENDOR AMOUNT
143469 IPCO SAFETY $14,418,42 SAFETY SUPPLIES
143470 ISCO,INC. $88.89 INSTRUMENT SUPPLIES
143471 IMAGING PLUS,INC. $658.16 GRAPHIC SUPPLIES
143472 IMPERIAL WEST CHEMICAL $93,445.39 FERRIC CHLORIDE M.O.11-18.92
143473 INDUSTRIAL THREADED PRODUCTS $673.45 CONNECTORS
143474 INORGANIC VENTURES,INC. $494.98 LAB SUPPLIES
143475 INTERMOUNTAIN SCIENTIFIC CORP. $817.77 LAB SUPPLIES
143476 INSTRUMENT SOCIETY OF AMERICA $47.50 SAFETY SUPPLIES
143477 INV17ROGEN CORP. SM.76 LAB SUPPLIES
143478 IRVINE RANCH WATER DISTRICT $109.35 WATER USE
143479 JIT COMPUTER SOURCE,INC. $139.00 COMPUTER SOFTWARE
143480 JAMISON ENGINEERING $38,913.41 CONSTRUCTION SERVICES
m 143481 GREAT WESTERN SANITARY SUPPLY. $1.652.59 JANITORIAL SUPPLIES
143482 JENSEN INSTRUMENTS CO. $489.58 INSTRUMENT PARTS
r 143483 JONES INDUSTRIAL HARDWARE CO. $298.77 SAFETY SUPPLIES
to 14U84 KAMAN BEARINGS 8 SUPPLY $241.75 MECHANICAL PARTS
143485 KING BEARING,INC. $235.05 HARDWARE
143486 WA%IE/KLEEN-LINE 54,83878 JANITORIAL SUPPLIES
> 143487 KNOX INDUSTRIAL SUPPLIES 5979." SAFETY SUPPLIES
1 143488 LA.S.INCORPORATED $5.511.41 INSTRUMENTS
w
143489 LA CELLULAR TELEPHONE CO. S538.98 CELLULAR TELEPHONE SERVICES
143490 LA MOTTE CHEMICAL PRODUCTS 5765AB CHEMICALS
143491 LAB SAFETY SUPPLY CO. 592.99 SAFETY SUPPLIES
143492 LAIDLAW ENVIRONMENTAL SERVICES $7,582.00 WASTE DISPOSAL SERVICES
143493 LAW/CRANDAL,INC. $1.202.00 LEGAL SERVICES M.O.7-13.94
143494 LEGI-TECH $320.00 COMPUTER SERVICES
143495 LEE B RO CONSULTING ENGR. $19,345.64 ENGINEERING SERVICES P1410.1
143496 LINCOLN NATIONAL LIFE INS.CO. $110,596.16 DEFERRED COMP TRUSTEE
143497 LIQUID HANDLING SYSTEMS $211.26 PUMP PARTS
143498 MBCAPPLIEDENVIRONMENTAL $970.00 OCEAN MONITORING M.0.6.10.92
143499 MACOMCO $2777.13 SERVICE AGREEMENT
143500 ERIC MAULAY 53,527.40 EMERGENCY DEFERRED COMP WITHDRAWAL
143501 MARGATE CONSTRUCTION,INC. $1.475.00 BASIN REPAIRS
143502 MARVAC ELECTRONICS $617.11 INSTRUMENT SUPPLIES
143W3 MCKENNA ENGR.8 EQUIP. $1,106.35 PUMP PARTS
143604 MCMASTER-CARR SUPPLY CO. $224.19 TOOL
143505 MEDLIN CONTROLS CO. 5311.12 INSTRUMENT SUPPLIES
143505 METTLER TOLEDO,INC. $608.46 INSTRUMENT PARTS
143507 MICROBIAL INSIGHTS,INC. $2,168.58 CONSULTING SERVICES M.O.11-18-92
14350E MIDWAY MFG.B MACHINING $7,050.50 MECHANICAL REPAIRS
143509 MIDWEST RESEARCH INST.(MRI) 52,850A I LAB SERVICES
143510 MISSION ABRASIVE SUPPLIES $712.64 SAFETY SUPPLIES
143511 MISSION INDUSTRIES $3,211.07 UNIFORM RENTALS
143512 MLADEN SUNTICH CONSTRUCTION IIM5,826.05 CONSTRUCTION 14-1-1A
143513 MONITOR LABS $13.535.77 INSTRUMENT SUPPLIES
143514 MOTION INDUSTRIES.INC. 5317.16 FITTINGS
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 03Po7/95 PAGE 4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 03/08195 POSTING DATE 031OWS
WARRANT NO. VENDOR AMOUNT
143515 NATIONAL RENT A FENCE CO. $128.59 FENCING RENTAL
143516 NATIONAL PLANT SERVICES,INC. $1.325.00 VACUUM TRUCK SERVICES
143517 NEAL SUPPLY CO. $2.408.24 PLUMBING SUPPLIES
143618 NEUTRON $5.191.91 CHEMICALS M.O.S-10.94
143519 CITY OF NEWPORT BEACH $13.57 WATER USE
143520 OCCUPATIONAL VISION SERVICES $50.73 SAFETY GLASSES
143521 OFFICE PAVILIONS/INTERIOR RESOURCES $76.71 OFFICE FURNITURE REPAIRS
143522 THE OHMART CORP. $1,887S5 INSTRUMENT REPAIRS
143523 ORANGE COAST PETROLEUM EQUIP. $338.66 TRUCK PARTS
143524 ORANGE COUNTY WHOLESALE $5.037.94 ELECTRIC PARTS
143525 ORANGE VALVE&FITTING CO. $4.827.24 FITTINGS
143528 COUNTY OF ORANGE $200.00 PERMIT FEES
K 143527 ORANGE COUNTY WATER DISTRICT $130,125.00 GAP WATER USE M.O.6-9-93
5 143528 PACIFIC MECHANICAL SUPPLY $2,691.60 MECHANICAL SUPPLIES
1435N PACIFIC PARTS $22.481.39 COMMUNICATION SUPPLIES
H 143530 PACIFIC PROCESS EQUIPMENT,INC. $363.89 PUMP PARTS
N 143531 IPCO SAFETY $262.33 SAFETY SUPPLIES
y 143532 PACIFIC BELL $71.07 TELEPHONE SERVICES
1 143533 PAGENET $1,063.90 RENTAL EQUIPMENT
C 143534 PAINE WEBBER $28.144.69 REMARKETING AGREEMENT-COP
143535 PARAGON CABLE $36.78 CABLE SERVICES
143536 PIMA GRO SYSTEMS,INC. $263,793.01 RESIDUALS REMOVAL M.0.541.91
143537 PITNEY BOWES $1.952.50 POSTAGE MACHINE SERVICE AGREEMENT
143536 PLAN-SAK $165.27 OFFICE SUPPLIES
1435M POLYMETRICS,INC. $1,262.75 LAB SUPPLIES
143640 POLYPURE,INC. $19.877.20 CATIONIC POLYMERM0.3-11-92
143541 HAROLD PRIMROSE ICE $96.00 ICE
143542 PROCESS EQUIPMENT COMPANY $1.489.38 PUMP PARTS
143543 PROFESSIONAL SERVICE IND. $608.00 SOIL TESTING
143544 RPM ELECTRIC MOTORS $308.22 ELECTRIC MOTOR PARTS
143545 RAINBOW DISPOSAL CO. $3.430.06 TRASH REMOVAL
143546 REISH MARINE STUDIES,INC. $760.00 OCEAN MONITORING
143547 REMEDYTEMP $1,804.76 TEMPORARY PERSONNEL SERVICES
143548 RYAN-HERCO $2,062.23 PUMP PARTS
143549 SANTA FE INDUSTRIAL PLASTICS $333.39 VALVES
143550 SANWA BANK $10.832.95 CONSTRUCTION RETENTION 14-14A
143551 DOUG SARVIS $1,500.00 CPR/FIRST AID TRAINING
143552 M.J.SCHIFF B ASSOC.,INC. $2,000.00 ENGINEERING SERVICES
143663 R.CRAIG SCOTT B ASSOC. $13,390.28 LEGAL SERVICES-PERSONNEL ISSUES
143654 SEA-BIRD ELECTRONICS,INC. $520.00 LAB REPAIRS
143555 SEA COAST DESIGNS $73.27 OFFICE EQUIPMENT
143556 CITY OF SEAL BEACH $246.90 WATER USE
143557 SHAMROCK SUPPLY $247.19 PAINT SUPPLIES
143558 SHAPEWARE CORP. $44.15 COMPUTER SOFTWARE
143559 SHURELUCK SALES $9,696.48 TOOLSIHARDWARE
C143560 SIGMA CHEMICAL CO $341.42 LAB SUPPLIES .
FUND NO 9199 - JT GIST WORKING CAPITAL PROCESSINGDATE ON07195 PAGE5
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 03MM S POSTING DATE 03/08M
WARRANT NO. VENDOR AMOUNT
143561 SKYPARK WALK-IN MEDICAL CLINIC $595.00 PRE-EMPLOYMENT PHYSICAL EXAMS
143562 SMITH-EMERY CO. E81.00 SOIL TESTING M.O.7-17-91
143563 SOFTHARD SYSTEMS $1,623.02 COMMUNICATION SUPPLIES
143664 SO COAST AIR QUALITY $1.525.00 PERMIT FEES
143665 SOUTH COAST WATER $160.00 SERVICE AGREEMENT
143566 SO CALIF.EDISON CO. E82,921.57 POWER
143567 SO.CAL.GAS.CO. $72,133.14 NATURAL GAS
143568 SOUTHERN COUNTIES OIL CO. $9,883.84 DIESELAINLEADED FUEL
143569 SPECTRUM-HUMAN RESOURCE SYST. $6.970.08 SERACEAGREEMENT
143570 SPEX INDUSTRIES,INC. $101.00 LAB SUPPLIES
143571 GARY G.STREED $2.608.25 REIMB.PETTY CASH,TRAINING&TRAVEL
143572 SUMMIT STEEL $1,008.00 METAL
[a 143573 SUNSETFORD $142AS TRUCK PARTS
143574 SUPELCO,INC. $127.05 LAB SUPPLIES
N 143575 TCH ASSOCIATES $49D.31 LAB SUPPLIES
m 143576 TEKMAR COMPANY $314.79 LAB SUPPLIES
143577 THOMPSON INDUSTRIAL SUPPLY $637.53 MECHANICAL PARTS
H 143578 TOLEDO SCALE CORP. $1,000.00 SERVICE AGREEMENT
9 143579 TRANSMATION,INC. $424.89 INSTRUMENT PARTS
1 143580 TRAVEL EXECUTIVES 5604.01 TRAVEL SERVICES M.O.6A-94
143581 TREE MUCK&AUTO ERSSUP E1,090.00 EXHIBITRUCK SPACE
143582 TRUCK 8 AUTO SUPPLY,INC. E492.85 TRUCK PARTS
1435M TRUESDAIL LASS $1.833.15 LAB SERVICES
143584 UNISOURCE&IOR BUTLER PAPER $282.12 OFFICE SUPPLIES
143585 UNITED PARCEL SERVICE $779.20 PARCEL SERVICES
143586 UNIVERSTTY OF MICHIGAN $120.00 LAB SUPPLIES
143567 ULTRA SCIENTIFIC $197.00 LAB SUPPLIES
143W8 VWR SCIENTIFIC $495.70 LAB SUPPLIES
14WB VALIN CORPORATION $936.59 MECHANICAL SUPPLIES
143590 VALLEY CITIES SUPPLY CO. $1.647.08 PLUMBING SUPPLIES
143591 VAN WATER&ROGERS $625.49 CHEMICALS
143592 VERNE'S PLUMBING $281.05 PLUMBING SERVICES
143593 VORTEX INDUSTRIES $549.44 BUILDING REPAIRS
143694 CARL WARREN B CO. $695.92 INSURANCE CLAIMS ADMINISTRATOR
143595 WESTERN STATES CHEMICAL SUPPLY $53.575.93 CAUSTIC SODA&HYPOCHLORIDE M.0.8-12-9284-13-94
143596 WEST-CITE SUPPLY CO. $573.46 ELECTRIC PARTS
143597 WESCO $5.126.57 INSTRUMENT SUPPLIES
143598 WESTTECH $4.308.45 COMPUTER
143599 WITEG $285.54 LAB SUPPLIES
1436DD ROURKE,WOODRUFF&SPRADUN $64.503.37 LEGAL SERVICES M,O.2-19-92
1436D1 XEROX CORP. $601.25 COPIER LEASES
143602 GEORGE YARDLEY CO. $56.99 INSTRUMENT SUPPLIES
143603 RICHARD YOUNG PRODUCTS 5421.75 OFFICE SUPPLIES
$2.824.935.68
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 03/07M5 PAGE 6
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID ON08195 POSTING DATE 03/08195
SUMMARY AMOUNT
01 OPER FUND $5,095.65
02 OPER FUND 23,340.18
62 CAP FAC FUND 359.084.39
03 OPER FUND 63.800.74
03 CAP FAC FUND 60,974.76
85 OPER FUND 10,599.16
46 OPER FUND 271.79
m 47 OPER FUND 4,922.22
X #7 CAP FAC FUND 280.00
x
411 OPER FUND 13,887.30
611 CAP FAC FUND 490,367.57
y 814 OPER FUND 2,203.01
014 CAP FAC FUND 225,491.00
> 65660PER FUND 3,339.80
m 661170PER FUND 2.96675
97&14 OPER FUND 7,748.94
JT OPER FUND 1,045,932.70
CORP 245,660.50
SELF-FUNDED INSURANCE FUND 15,107.62
JT DIST WORKING CAPITAL 243,761.50
$2.824.935.58
C C �
FUN(HO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 0316195 PAGE 1
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID D3/22195 POSTING DATE 03Q 5
WARRANT NO. VENDOR AMOUNT DESCRIPTION
143627 AG TECH COMPANY $80.433.81 RESIDUALS REMOVAL M.0.10.9.91
14W28 ASRANALYSIS $1.156.80 ENGINEERING SERVICES
143629 ATM AA,INC. 83,244.W LAB SERVICES
143630 AT&T -UNIPLAN SERVICE $2,732.35 LONG DISTANCE TELEPHONE SERVICES
143631 A T&T-MEGACOM SERVICE $156.16 LONG DISTANCE TELEPHONE SERVICES
143632 ABRASIVE ENG.,TOOL&EQUIP. $61.92 TOOLS
143633 ADAMSON INDUSTRIES $662.53 LAB SUPPLIES
143634 ADVANCO CONSTRUCTORS,INC. $110,281.15 CONSTRUCTION Pl- 8 l
143635 AIR LIOUIDE AMERICA CORP. $1.647.23 SPECIALTY GASSES
143636 ALFA-LAVAISEPARATION,INC. $294.56 MECHANICAL REPAIRS
143637 AMER.SOCIETY FOR MICROBIOLOGY $5%.00 PRINTING
m 143638 AMERESCO,INC. $99.12 LAB SUPPLIES
X 143639 ANOTTER-DISTRIBUTION $174.78 INSTRUMENT PARTS
x 143640 ANTHONY PEST CONTROL $195.00 SERVICE AGREEMENT
143W1 A-PLUS SYSTEMS $1,158.09 NOTICES&ADS
143642 ACS(APPLIED COMPUTER SOLUTION) $19,348.35 COMPUTER SUPPLIES
143643 ABC LABORATORIES $2.160.00 LAB SERVICES
y 143W AR120NA INSTRUMENT $1,296.01 INSTRUMENT SUPPLIES
I 143645 ARTS DISPOSAL SERVICE,INC. $564.40 WASTE REMOVAL
-' 143646 AMCIACORDIA $266.15 1099 SERVICES-1994 SFI
143647 ATKINIJONES COMPUTER SERVICE $321.30 SERVICE AGREEMENT
143648 AUTOMATIC DATA PROCESSING $4,569.79 PAYROLL SERVICES
143649 AWARDS&TROPHIES $21.09 PLAGUES
143650 BKK LANDFILL $2.274.0 RESIDUALS REMOVAL M.0AD-9-91
143651 BRW SAFETY&SUPPLY $1.232.98 SAFETY SUPPLIES
143552 BANANA BLUEPRINT $1,858.23 PRINTINGM.0.11-07-94
143653 BANK OF THE WEST $2.321.31 CONSTRUCTION RETENTION J-23-2
143654 BATTERY SPECIALTIES $1,422.30 BATTERIES
143655 BAUER COMPRESSOR $86.28 COMPRESSOR PARTS
1436% BAXTER DIAGNOSTICS,INC. 55,221.60 LAB SUPPLIES
143657 BENTLY NEVADA $2,189.79 INSTRUMENT PARTS
143658 810 VENTURES,INC. $237.00 LAB SUPPLIES
143659 BLASIUS ELECTRIC TRUCK.INC. $843.81 TRUCK PARTS
143660 KEVIN BOJAN $10.82 REFUND USER FEE OVERPAYMENT
143MI BOLSA RADIATOR SERVICE $178.43 TRUCK REPAIRS
143662 BOOTBARN $145.25 REIMBURSABLE SAFETY SHOES
143663 BOYLE ENGINEERING CORP. $3,171.05 ENGINEERING SERVICES 7.22
143664 BURKE ENGINEERING CO. $1,529.55 ELECTRIC SUPPLIES
143665 BURLINGTON SAFETY LAB,INC. $175.50 INSTRUMENT PARTS
143666 CPR FOR LIFE $1.286.00 SAFETY TRAINING
143667 CS COMPANY $1".76 PLUMBING SUPPLIES
143668 SRTC94-CWPCA,INC. $706.00 CONFERENCE REGISTRATION
143669 CALIF ASSOC.OF SAN.AGENCIES $480.00 WORK CONFERENCE REGISTRATION
14W70 CALIFORNIA AUTOMATIC GATE $272.24 SERVICE AGREEMENT
143671 CALSCIENCE ENVIRONMENTAL LABS $1.680.00 LAB SERVICES
143672 JOHN CAROLLO ENGINEERS $9,080,02 ENGINEERING SERVICES PI-W
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE 03116195 PAGE2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 03/22/95 POSTINGDATE0MM5
WARRANT NO. VENDOR AMOUNT
143673 CHEVRON PIPELINE COMPANY $300.00 PIPING REMOVAL 3.38.2
143674 CHROME CRANKSHAFT,INC. $1,200.00 PUMP PARTS
143676 COAST FIRE EQUIPMENT $800.00 SERVICE AGREEMENT
143676 COMBYTE USA,INC. $650.00 OFFICE EQUIPMENT
143677 COMPRESSOR COMPONENTS OF CA $2,467.48 PUMP PARTS
143678 COMPUSA,INC. $365.13 COMPUTER SOFTWARE
143679 COMPUSERVE $2W.50 COMPUTER SERVICES
143680 CONTINENTAL AIR TOOLS INC. $101.01 TOOLS
143681 CONTINENTAL LAB PRODUCTS $3,123.66 LAB SUPPLIES
143682 CONVERSE CONSULTANTS O C $122.86 CONSULTING SERVICES M.O.S-11.93
143683 COOPER CAMERON CORP. 5903.34 ENGINE PARTS
143694 COSTA MESA AUTO SUPPLY $491.41 TRUCK PARTS
14W85 COUNTY CLERK $225.00 NOTICE OF EXEMPTION FILING FEES
>e 143686 COUNTY WHOLESALE ELECTRIC $17.99 ELECTRIC PARTS
x
ra 743687 DOMMINSALLI$DN CORP. $10,284.29 OFFICE EQUIPMENT M.O.3-&95
m 143688 CALIFORNIA DEPT.OF HEALTH SERVICES $4,040.10 LICENSE FEE
H
143689 DAILY PILOT 564.00 NOTICES&ADS
143890 DWOI.Ab J.DAVIS&ASSOC.,INC. $950.00 CONSULTING SERVICES-INFLUENT METERING
tb 143691 DELTA DENTAL PLAN OF CALIF. $20.520.31 DENTAL INSURANCE PLAN
N 143692 DIGITAL EQUIPMENT CORP. $10.609.55 OFFICE EQUIPMENT
143693 DISPOSAL CONTROL CENTER $463.32 REFUND USER FEE OVERPAYMENT
1436N DOVER ELEVATOR COMPANY $171.75 ELEVATOR MAINTENANCE
143696 ROBERT F.DRIVER ASSOC. $77,376.78 PERSONNEL INSURANCE CONSULTANT
143696 DUNN EDWARDS CORP. $254.07 PAINTSUPPLIES
143697 OVALS SALES $494.11 FITTINGS
143698 E J L&ASSOC. $358.00 LAB SERVICES
143699 ESP NORTH $151.93 SAFETY SUPPLIES
14371X1 ENVIRONMENTAL SAMPLING $90.93 LAB SERVICES
143701 EASTMAN.INC. $8.810.50 OFFICE SUPPLIES
143702 ECOANALYSIS,INC. $2,886.04 CONSULTING SERVICES
143703 ENCHANTER,INC. $3.920.00 OCEAN MONITORING M.O.6-10-92
143704 ENVIROGEN.INC. 54,845.00 SIOTRICKLING SERVICESIEQUIPMENT
143705 ENVIRONMENTAL RESOURCE ASSOC. $750.50 LAB SERVICES
143706 EXFO CIO WARD DAVIS CO. $8.770.00 OFFICE EQUIPMENT
143707 FLUID TECH.SALES $336.70 ELECTRIC SUPPLIES
143708 FMC CORP. $16,551.20 CHEMICALS
143709 MARSHALL FAIRRES $28.08 DEFERRED COMP DISTRIBUTION
143710 FALCON DISPOSAL SERVICE $4.073.75 RESIDUALS REMOVAL M.O.10.941
143711 FIBERTRON $3,803.08 INSTRUMENT PARTS
143712 FILTER SUPPLY CO. $447.55 FILTERS
143713 FIRST CHOICE $1,054.00 OFFICE EQUIPMENT
143714 FIRST CO.WOR NORTHERN DIST. $195.51 JANITORIAL SUPPLIES
143715 FISCHER&PORTER CO. $526.03 CHARTPAPER
143716 FISHER SCIENTIFIC CO. $821.05 LAB SUPPLIES
143717 FISIONS INSTRUMENTS $150.98 LAB SUPPLIES
143718 FLICKINGER CO. $357.91 INSTRUMENT PARTS
C
FUNDING 0199 - JT DIST WORKING CAPITAL PROCESSINGDATE 0311695 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 032295 POSTING DATE 032295
WARRANT NO. VENDOR AMOUNT
143719 FLO-SYSTEMS,INC. $11,762.83 FITTINGS
143M FOUNTAIN VALLEY CAMERA $39.34 PHOTO SUPPLIES
143721 FOUNTAIN VALLEY PAINT $856.68 PAINT SUPPLIES
143722 GST,INC. $3,683.68 OFFICE EQUIPMENT
143723 GANAHL LUMBER CO. $4,015.89 LUMBER/HARDWARE
143724 GARRATT-CALLAHAN COMPANY $360.96 CHEMICALS
143725 GATES FIBERGLASS INSTALLERS 3715.50 FIBERGLASS
143726 GENERAL BINDING CORP. $408.25 OFFICE SUPPLIES
143727 GENERAL TELEPHONE CO. $7.585.05 TELEPHONE SERVICES
143728 GERHARDTS,INC. $463.75 INSTRUMENT PARTS
143729 GIERUCH-MITCHELL,INC. $30.342,28 PUMP PARTS
t43730 GOVT FINANCE OFFICERS ASSOC. $375.00 PUBLICATIONS
x 143731 GRAHAM COMPANY $800.00 SERVICE AGREEMENT
5 143M W W GRAINGER,INC. $164.54 TRUCK PARTS
H 143733 GRASSY S.T.I. $5.687.54 ENGINE PARTS
r�i 143734 HBO TECHNOLOGY $90.531.02 CONSTRUCTION J-23-2
143735 HIS TYPE&GRAPHICS $19.40 PRINTING
m 143738 FRED A HARPER $1.100.00 DEFERRED COMP DISTRIBUTION
I 143737 THE HARTWELL CORPORATION $1.307.08 REFUND USER FEE OVERPAYMENT
w 143738 HAULAWAY CONTAINERS $1,650.00 CONTAINER RENTALS
143739 PL HAWN CO,INC. 3542.74 ELECTRIC SUPPLIES
143740 HERTZ CLAIM MANAGEMENT $2.083.33 WORKERS COMP CLAIMS ADMIN.
143741 HIBINO USA,INC. $7,542.50 OFFICE EQUIPMENT
143742 HILTI,INC. $240.72 PLUMBING PARTS
143743 HOLMES&NARVER INC. $19,774.43 ENGINEERING SERVICES 2-14-5R2
143744 HOME DEPOT $386.42 HARDWARE
143745 HORBINA INSTRUMENTS,INC. $2W.09 INSTRUMENT REPAIRS
143748 RS HUGHES CO,INC. $680.03 PAINTSUPPLIES
143747 ORANGE COUNTY FED.CREDIT UNION 3680.00 DEFERRED COMP DISTRIBUTION
143748 IPCO SAFETY $769.92 SAFETY SUPPLIES
143749 IMPERIAL WEST CHEMICAL $61.045.75 FERRIC CHLORIDE M.O.11.18-92
143750 INDUSTRIAL STEAM $1,209.63 MECHANICAL PARTS
143751 INDUSTRIAL THREADED PRODUCTS $839.27 CONNECTORS
143752 INTERMOUNTAIN SCIENTIFIC CORP. $95.79 LAB SUPPLIES
143753 INTERBINO,INC. $4,413.72 JANITORIAL SUPPLIES
143754 INTERNAL REVENUE SERVICE $780.62 WAGE LEVY
143755 INTERSTATE BATTERY SYSTEMS $714.87 BATTERIES
143756 JAMISON ENGINEERING $1,683.26 CONSTRUCTION SERVICES
143737 GREAT WESTERN SANITARY SUPPLY. $568.36 JANITORIAL SUPPLIES
143758 JENSEN INSTRUMENTS CO. $53.85 INSTRUMENT PARTS
143759 AF JOHNSON COMPANY $1,135.95 MECHANICAL PARTS
143M JOHNSTONE SUPPLY $557.49 ELECTRIC PARTS
143761 JOHNSTON PUMP CO. $2,183.02 MECHANICALPARTS
143M THE KEITH COMPANIES $3.687.02 ENGINEERING SERVICES 3�36R
143M KEYE PRODUCTIVITY CENTER $139.00 TRAINING REGISTRATION
143764 KING BEARING,INC. $14.014.31 MACHINE SUPPLIES
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 03110195 PAGE 4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 03/22/95 POSTING DATE 03/22/95
WARRANT NO. VENDOR AMOUNT
143765 KNOX INDUSTRIAL SUPPLIES $1,594.72 SAFETY SUPPLIES
143766 LAKEWOOD INSTRUMENTS E401.55 ELECTRIC PARTS
143767 LAW/CRANDAL,INC. $2.675.00 TESTING SERVICES
143768 LEE B RO CONSULTING ENGR. $1,780.61 ENGINEERING SERVICES P140.2
143769 LESLIE CONTROLS $163.30 MECHANICAL PARTS
143770 LIFT-IT MFG CO. $672.00 SAFETY SUPPLIES
143771 UMITOROUE CORP. $2.972.71 MECHANICAL PARTS
143772 MACOMCO $577.20 SERVICE AGREEMENT
143773 MARGATE CONSTRUCTION,INC. $325.605.00 CONSTRUCTION P242-2
143774 MARVAC ELECTRONICS E71AS INSTRUMENT SUPPLIES
143776 MECHANICAL DRIVES CO. E153.03 INSTRUMENT SUPPLIES
143776 MEMSREJL $693.74 LAB SUPPLIES
[4 143777 MICROBICS CORPORATION E670,95 CHEMICALS
K 143778 MICROSOFT PRESS E171.20 COMPUTER SOFTWARE
H 143779 MISSION INDUSTRIES $4.422.35 UNIFORM RENTALS
ue 143780 MONITOR LABS $008.33 INSTRUMENT SUPPLIES
H 143781 MONTGOMERY LABORATORIES $375.00 LAB SERVICES
1437B2 MOTION INDUSTRIES,INC. $243.01 FITTINGS
143783 MOTOROLA.INC. $1,320.33 INSTRUMENT PARTS
P
1437114 NATIONAL PLANT SERVICES INC. $2,012.60 VACUUM TRUCK SERVICES
143765 NATIONAL SAFETY COUNCIL E70.35 SAFETY FILM RENTALS
143786 NEAL SUPPLY CO. $2,203.13 PLUMBING SUPPLIES
143787 NEUTRON E6,9a.17 CHEMICALSM.0.8-10-94
1437M NEOTRONICS $211.30 MSTRUMENTPARTS
143789 NEWARK ELECTRONICS $278.35 ELECTRIC SUPPLIES
143790 MC NOTTINGHAM CO.,INC. $1,742.60 VACUUM TRUCK SERVICES
143791 THE OHMART CORP. $400.36 INSTRUMENT PARTS
143792 ORANGE COUNTY CHEMICAL CO. $1.842.25 CHEMICALS
143793 ORANGE COUNTYWHOLESALE $13.224.29 ELECTRIC SUPPLIES
143794 ORANGE COURIER $59.10 COURIER SERVICES
143795 ORANGE VALVE 8 FITTING CO. $757.84 FITTINGS
143796 OXYGEN SERVICE $247.20 SPECIALTY GASES
143797 COUNTY SANITATION DISTRICT $7.853.99 REIMBURSE WORKERS COMP
143798 COUNTY OF ORANGE $357.50 PERMIT FEES
143799 PARASITOLOGY RESEARCH LABS $217.00 LAB SUPPLIES
143800 PSSI $937.50 SEWER VIDEO INSPECTION
143601 PACIFIC PARTS $18.678.36 INSTRUMENT PARTS
143802 PACIFIC PROCESS EQUIPMENT,INC. $1.488.32 PUMP PARTS
143803 PACIFIC BELL $2,134.36 TELEPHONE SERVICES
143804 PAGENET $965.98 RENTAL EQUIPMENT
143805 PARKHOUSE TIRE CO. $725.76 TRUCK PARTS
143808 PASCAL 8 LUDWIG INC. $50,113.00 CONSTRUCTION PI-36.2
143807 PATTEN CORP/TAYLOR INSTRUMENT $1,669.11 INSTRUMENT PARTS
143WO PEERLESS WIPING MATERIALS E666.69 JANITORIAL SUPPLIES
143809 PERKIN-ELMER CORPORATION $1.261.43 LAB SUPPLIES
143810 PIMA GRO SYSTEMS.INC. $100,445.11 RESIDUALS REMOVAL M.0.5.8.91
C
FUNDNO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE ON16M PAGE5
REPORT NUMBER M43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0322195 POSTING DATE ONZW5
WARRANT NO. VENDOR AMOUNT
143811 PLAINS TRUEVALUE HARDWARE $41.77 HARDWARE
143812 PLAN-SAK $70.02 ENGINEERING SUPPLIES
143513 POLYMETRICS,INC. $1.262.75 LAB SUPPLIES
143814 POLYPURE,INC. $24.756.09 CATIONIC POLYMER M.O.3-11-92
143815 POSITIVE FORMULATORS,INC. $195.86 CHEMICALS
143816 POSTAGE BY PHONE $5,DDD.00 POSTAGE
143817 POSTMASTER $450.00 P.O.BOX RENTAL
143818 PRECISION GLASS BLOWING $213.98 LAB SUPPLIES
143819 HAROLD PRIMROSE ICE $84.00 ICE
143820 PULSAFEEDER $575.12 PUMP PARTS
143621 RPM ELECTRIC MOTORS $145A8 ELECTRIC PARTS
143622 THE REGISTER $633.42 NOTICES$ADS
>4 143823 REMEDYTEMP $3,112.70 TEMPORARY PERSONNEL SERVICES
S 143824 MCJUNKIN-REPUBLIC SUPPLY $1.529.16 PLUMBING SUPPLIES
143825 RM MEASUREMENT AND CONTROL $963.63 COMMUNICATION SUPPLIES
�+ 143825 ROBBINS SCIENTIFIC $154.13 LAB SUPPLIES
"4 143827 ROSE CARPET$UPHOL.CARE $270.00 CARPET REPAIRS
m 143628 ROSEMOUNTANALYTICAL,INC. $1.249.13 ELECTRIC PARTS
143829 RUSH ENGINEERING ASSOC. $535.00 ENGINEERING SERVICES
14MO RYAN-NERCO $288.10 PUMP PARTS
143831 SON,INC. $432.36 INSTRUMENT SUPPLIES
143832 M.J.SCHIFF B ASSOC.,INC. $2,000.00 ENGINEERING SERVICES
143833 SCIENTIFIC REFRIGERATION $1.02.0 LAB SERVICES
143534 R.CRAIG SCOTT&ASSOC. $5.874.39 LEGAL SERVICES-PERSONNEL ISSUES
143835 SEA COAST DESIGNS $48.00 OFFICE EQUIPMENT
143636 SHEPHERD MACHINERY CO. $129.26 TRUCK PARTS
143837 SHURELUCK SALES $12.291.27 HARDWARE
143838 SKYPARK WALK-IN MEDICAL CLINIC $64.35 PRE-EMPLOYMENT PHYSICAL EXAMS
143839 SMITKEMERY CO. $282.00 SOIL TESTING M.O.7-13-94
143 10 SMITH PIPE 8 SUPPLY $147.14 PLUMBING SUPPLIES
143841 SCAP $24,000.00 19951%ANNUAL DUES
143842 SOUTHERN CALIF.EDISON CO. $3,92084 POWER
143843 SO CALIF.EDISON CO. $41,211.37 POWER
143844 SO.CAL.GAS.CO. $18,437A0 NATURAL GAS
143845 SOUTHERN COUNTIES OIL CO. $6,696.77 DIESEL/UNLEADED FUEL
143846 SPARKLETTS DRINKING WATER $2,405.89 DRINKING WATERICOOLER RENTALS
143847 SPARLING INSTRUMENT CO.,INC. $250.00 METER
143548 SPECIAL PLASTIC SYSTEMS,INC. $826.98 PLUMBING SUPPLIES
14W9 SPECIALIZED PRODUCTS CO. $861.84 TOOLS
143850 SPEX INDUSTRIES,INC. $40.64 LAB SUPPLIES
143851 STATE BOARD OF EQUALIZATION $200.00 ANNEXATION PROCESSING FEES
143852 STATE BOARD OF EQUALIZATION $2WG0 ANNEXATION PROCESSING FEES
143853 STATE BOARD OF EQUALIZATION $200.00 ANNEXATION PROCESSING FEES
143854 GARY G.STREED $2.523.38 REINUL PETTY CASH,TRAINING$TRAVEL
143855 SUPELCO,INC. $81.80 LAB SUPPLIES
143856 SURVEYORS SERVICE CO. $85.90 TOOLS
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE 03N6(95 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 03122195 POSTING DATE 0=2196
WARRANT NO. VENDOR
143557 TON ASSOCIATES $822.20 LAB SUPPLIES
143858 TAYLOR-DUNN MFG.COMPANY $1,478.79 ELECTRIC CART PARTS
143859 TEKDRAULICS $5.771.10 PUMP PARTS
143860 THOMPSON INDUSTRIAL SUPPLY $1,622.99 MECHANICAL PARTS
143861 TONY'S LOCK&SAFE SERVICE $370.48 LOCKS&KEYS
143862 TREBOR ELECTRONICS $682.68 ELECTRIC SUPPLIES
143863 TROPICAL PLAZA NURSERY,INC. $11,556.84 CONTRACT GROUNDSKEEPING M.O.5-11-"
143864 TRUCK&AUTO SUPPLY,INC. $99.65 TRUCK PARTS
143855 TRUESDAIL LABS $5.380.95 LAB SERVICES
143856 JG TUCKER&SON,INC. $67.24 INSTRUMENT PARTS
143667 TUTHILL CORP/COPPUS DIV. $1.302.39 MECHANICAL PARTS
143868 ULTRA SCIENTIFIC 5289.00 LAB SUPPLIES
Ly 143869 UNDERSEAGRAPHICS,INC. $15,000.00 OCEAN OUTFALL REPAIRS
X 143870 UNISOURCEWOR BUTLER PAPER $527.54 OFFICE SUPPLIES
S 143871 UNITED PARCEL SERVICE $178.84 PARCEL SERVICES
H
Iy 143872 VWR SCIENTIFIC E435.11 LAB SUPPLIES
143873 VALLEY CITIES SUPPLY CO. $694.30 FITTINGS
H 143874 VARIAN ASSOCIATES,INC. $340.86 LAB SUPPLIES
m 143875 VERNE'S PLUMBING 5165.0D PLUMBING SERVICES
143876 WAL-CON CONSTRUCTION CO. $20,002.50 CONSTRUCTION 537-3
a 143877 WAXIE $6,946.W JANITORIAL SUPPLIES
143878 WEIGH TRONIX,INC. $192.08 SCALE REPAIRS
143879 WESTERN STATES CHEMICAL SUPPLY $37.1 MAD CAUSTIC SODA&HYPOCHLORIDE M.0.8.12-92&413-80
143880 WESTERN WATER WORKS $304.68 VALVES
143881 WEST-LITE SUPPLY CO. $1.020,78 ELECTRIC SUPPLIES
143882 WHESSOE VAREC $877.09 VALVES
143883 WITEG $663.64 LAB SUPPLIES
143884 XEROX CORP. $10.135.57 COPIER LEASES
143885 GEORGE YARDLEY CO. $631.05 HARDWARE
143866 RICHARD B.EDGAR $200.00 DEFERRED COMP DISTRIBUTION
TOTAL CLAIMS PAID 0312M5 $1.613.346.19
C
FUND NO 9199 - JT GIST WORKING CAPITAL PROCESSING DATE 03/18/95 PAGE]
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0322/95 POSTING DATE O3I=$
SUMMARY AMOUNT
92 OPER FUND $200.00
92 CAP FAC FUND 19.774.43
83 OPER FUND 31.683.67
43 CAP FAC FUND 6.525.90
85 OPER FUND 9.085.45
95 CAP FAC FUND 535.00
P]0PER FUND 1.707.35
ill CAP FAC FUND 23.100.11
411 OPER FUND 907.35
414 CAP FAC FUND 2,575.00
4585 CAP FAC FUND 20.002.50
s k887 OPER FUND 453.60
#7914 OPER FUND 691.17
JT OPER FUND SN,000.97
.a CORP 484,079A3
SELF-FUNDED INSURANCE FUND 30,723.78
I JT DIST WORKING CAPT7AL 435.300.28
J
81.813.346AII
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 3/30195 PAGE 1
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/05/95 POSTING DATE 04/05/BS
WARRANT NO. VENDOR AMOUNT DESCRIPTION
143903 A C&S $9,878.16 MECHANICAL REPAIRS
143904 AG TECH COMPANY $103,389.60 RESIDUALS REMOVAL M.0.10-9.91
143905 AMCO ENGINEERING CO. $84.05 OFFICE EQUIPMENT
143906 AT&T-MEGACOM SERVICE $967.80 LONG DISTANCE TELEPHONE SERVICES
143907 A T&T-PRO WATTS $27.37 LONG DISTANCE TELEPHONE SERVICES
1439D8 ADVANCED COOLING TECHNOLOGIES $420.00 ELECTRICAL SERVICES
143909 AIR PRODUCTS&CHEMICALS $18.037.20 O&M AGREEMENT OXY GEN.SYST.M.0.8-9.89
143910 ALLIED MODULAR BLDG SYST. $802.50 OFFICE PARTITION
143911 AMERICAN AIR FILTER,INC. $1,274.98 FILTERS
143912 THE BOND BUYER $658.77 SUBSCRIPTION
143913 ANAHEIM SEWER CONSTRUCTION $2.500.00 EMERGENCY SEWER REPAIRS
p4 143B14 ANIXTER-DISTRIBUTION $547.87 COMPUTER SUPPLIES
ti 143915 ANTHONY PEST CONTROL $330.00 SERVICE AGREEMENT
m
143916 A-PLUS SYSTEMS S410.55 NOTICES&ADS
� 143817 ACS(APPLIEO COMPUTER SOLUTION) E7,791.89 OFFICE EQUIPMENT
H 143918 ARIZONA INSTRUMENT $2,093.80 INSTRUMENT REPAIRS
n 143919 ASBURY ENVIRONMENTAL SERV. $35.00 WASTE OIL REMOVAL
143920 BKK LANDFILL $3,843.69 RESIDUALS REMOVAL M.0.10-9.91
143921 BANANA BLUEPRINT $4.16 PRINTING M.0.11-07-94
143922 BATTERY SPECIALTIES $139.65 BATTERIES
143923 BAXTER DIAGNOSTICS,INC. $3,119.05 LAB SUPPLIES
143924 BEACON BAY ENTERPRISES,INC. $186.15 TRUCK WASH TICKETS
143925 810-RAD LABORATORIES $87.97 LAB SUPPLIES
143926 SOLSA RADIATOR SERVICE $247.02 TRUCK REPAIRS
143927 BOYLE ENGINEERING CORP. $8.612.33 ENGINEERING SERVICES 7.22
143928 BRENNER-FIEDLER B ASSOC.,INC. $727.37 LAB SUPPLIES
143929 BRITHINEE ELECTRIC $166.13 INSTRUMENT SUPPLIES
143930 BRONSON.BRONSON&MCKINNON $49,327.09 LEGAL SERVICES-COUNTY BANKRUPTCY M.0.12-8.94
143931 BURKE ENGINEERING CO. $119.19 ELECTRIC SUPPLIES
M932 BUSH B ASSOCIATES,INC. $3,60D.00 SURVEYING SERVICES M.O.6A-94
143933 BUSINESS PUBLISHERS,INC. $351.00 SUBSCRIPTION
143934 C.L.TECHNOLOGY $720.00 GAS ANALYSIS SERVICES
143935 1995 CONFERENCE,CWPCA,INC. $95.00 CONFERENCE REGISTRATION
143938 CADIRECTION $1.076.66 COMPUTER SOFTWARE
143937 CALIFORNIA AUTOMATIC GATE $985.64 SERVICE AGREEMENT
143938 CALIF.MUNICIPAL TREASURES ASSOC. $75.00 MEMBERSHIP DUES
143939 CANUS CORPORATION $1,043.77 FIBER OPTIC CABLE
143940 JOHN CAROLLO ENGINEERS $16,987.26 ENGINEERING SERVICES
143941 JOHN CAROLLO ENGINEERS $96,766.10 ENGINEERING SERVICES PI-38,J-34
143942 CENTURY SAFETY INST.&SUPPLY S349.11 SAFETY SUPPLIES
143943 CERFNET E76.57 SERVICE AGREEMENT
143944 CHASE,ROTCHFORODRUKKER $1,462.02 LEGAL SERVICES-PERSONNEL UAB.
143945 CHEMWEST,INC. $1,031.55 PUMP PARTS
143946 CHROME CRANKSHAFT,INC. $260.00 MECHANICAL PARTS
143947 COLE-PALMER INSTRUMENT CO. $74.31 LAB SUPPLIES
143948 C COUCH&SONS C $65.694.25 CONSTRUCTION 2-9-111
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE W30/95 PAGE 2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04AMS POSTING DATE 04/05/95
WARRANT NO. VENDOR AMOUNT
143949 COUCH 8 SONS $114,095.66 CONSTRUCTION 11-17.1
143950 CONTINENTAL AIR TOOLS INC. $1.739.09 CRANE
143951 CONTRACTORS EQUIPMENT CO. $724.56 TRUCK PARTS
143952 COOPER CAMERON CORP. $2,257.65 INSTRUMENT PARTS
143953 COSTA MESA AUTO SUPPLY $82.81 TRUCK PARTS
143954 UNIV.OF CALIF.LOS ANGELES $85.80 PUBLICATIONS
143955 DELL COMPUTER CORP. $13,433.59 COMPUTER SYSTEM PARTS
143956 DIGITAL EQUIPMENT CORP. E34,461.79 OFFICE EQUIPMENT
143957 DOVER ELEVATOR COMPANY $390.00 ELEVATOR MAINTENANCE
143958 DUNN EDWARDS CORP. $75.63 HARDWARE
143959 EASTMAN.INC. $1,717.61 OFFICE SUPPLIES
143960 EBERHARD EQUIPMENT $164.92 TRUCK PARTS
% 143961 ENCHANTER,INC. $2,800.00 OCEAN MONITORING M.Ob10-92
S 143962 ENVIROTECHAVESTRONICS $231.00 INSTRUMENT PARTS
143963 FLUID TECH.SALES $580.72 INSTRUMENT SUPPLIES
e
�-+ 143980 FALCON DISPOSAL SERVICE E3,382.58 RESIDUALS REMOVAL M.O.10-9-91
143965 FEDERAL EXPRESS CORP. $576.75 AIR FREIGHT
143966 FILTERLINE CORP. $514.58 CHLORINATION SUPPLIES
143967 FISHER SCIENTIFIC CO. $553.33 FILTERS
N 143968 FLO-SYSTEMS.INC. $5.432.98 PUMP PARTS
143969 CLIFFORD A.FORKERT $652.50 SURVEYING SERVICES M.O.6-8-94
143970 FOUNTAIN VALLEY CAMERA $42.88 PHOTO SUPPLIES
143971 FREEDOM IMAGING $70.72 SERVICE AGREEMENT
143972 FRY'S ELECTRONICS $1,137.73 OFFICE EQUIPMENT
143973 CITY OF FULLERTON $44.90 WATER USE
143974 GST,INC. $16,280.20 COMPUTER SUPPLIES
143975 GENERAL TELEPHONE CO. $213.92 TELEPHONE SERVICES
143976 GIERUCH-MITCHELL,INC. $10.497.99 MECHANICAL PARTS
143977 WIN GRAINGER,INC. $37.11 COMPRESSOR PARTS
143978 GRASSY S.T.I. $4,308.95 INSTRUMENT SUPPLIES
143979 THOMAS GRAY 8 ASSOC..INC. $567.00 LAB SERVICES
143980 GREAT LAKES INSTRUMENTS,INC. 1219.94 INSTRUMENT PARTS
143981 DGA CONSULTANTS $5,195.00 SURVEYING SERVICES M.O.6$94
143982 HAAKER EQUIPMENT CO. $237.68 TRUCK PARTS
143983 HART GRAPHICSINETWARE $225.00 PUBLICATION
1439M HATCH&KIRK,INC. E2,633.94 ENGINE PARTS
143985 HERTZ CLAIM MANAGEMENT $2,083,33 WORKERS COMP CLAIMS ADMIN.
143986 HEWLETT PACKARD CO. $94.82 LAB SUPPLIES
143987 HILTI,INC. $85.73 TOOLS
143968 HOLMES B NARVER.INC. $63.998.65 ENGINEERING SERVICES PI44
143989 IPCO SAFETY $938.41 SAFETY SUPPLIES
143990 IMPERIAL WEST CHEMICAL $82,408.97 FERRIC CHLORIDE M.O.11-18-92
143991 INTUITIVE TECHNOLOGY $7.980.00 COMPUTER SOFTWARE
143992 J2 PRINTING SERVICES $61.42 PRINTING
143993 JAMISON ENGINEERING $10.876.98 CONSTRUCTION SERVICES
143994 GREAT WESTERN SANITARY SUPPLY $505.81 JANITORIAL SUPPLIES
FUNDNO 9199 - JT DIST WORKING CAPITAL PROCESSINGOATE IWM5 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04105I95 POSTING DATE 04M5195
WARRANT NO. VENDOR AMOUNT
143995 KAFCO SALES CO. $180.06 SAFETY SUPPLIES
1439% THE KEITH COMPANIES $449.28 ENGINEERING SERVICES 3-36R
143997 KING BEARING,INC. $2,187.35 MACHINE SUPPLIES
143998 KNOW IT ALL $198.00 OFFICE EQUIPMENT
143999 KNOK INDUSTRIAL SUPPLIES $1.431.45 TOOLSIHARDWARE
144000 L A CELLULAR TELEPHONE CO. $410.69 CELLULAR TELEPHONE SERVICES
144001 LADDER MAN,INC. $589.00 TOOLS
144002 LAIDLAW ENVIRONMENTAL SERVICES $1.217.25 WASTE DISPOSAL SERVICES
144003 LAMSON CORPORATION $187.09 COMPRESSOR PARTS
1"004 LAKEWOOD INSTRUMENTS 5604.87 INSTRUMENT PARTS
1"005 ORANGE COUNTY DIV.LEAGUE OF CALIF.CITIES $500.00 MEMBERSHIP DUES
m 144006 LEE B RO CONSULTING ENGR. $36,266.19 ENGINEERING SERVICES P1461
xm 1"007 LEHMAN BOTHERS,INC. $5268.49 REMARKETING FEE TCPP
144008 LONGPRE AUTO CENTER 5131.94 TRUCK PARTS
w 144009 MBC APPLIED ENVIRONMENTAL $986.20 OCEAN MONITORING M.0.6-10.92
144010 MC NOTTINGHAM CO. $197.95 REFUND USER FEE OVERPAYMENT
.9 144011 MATT-CHLOR,INC. $1,697.56 CHLORINATION SUPPLIES
144012 MECHANICAL DRIVES CO. $153.03 INSTRUMENT SUPPLIES
144013 MEDLIN CONTROLS CO. E155.87 INSTRUMENT SUPPLIES
1"014 MICROAGE OF CERRITOS $8,071.93 OFFICE EQUIPMENT
144015 MISSION INDUSTRIES $3,247.49 UNIFORM RENTALS
U4016 MISSION UNIFORM SERVICE $7,732.56 REFUND USER FEE OVERPAYMENT
144017 MLADEN BUNTICH CONSTRUCTION $326663.82 CONSTRUCTION 14-1-IA
144018 MOODY'S INVESTORS SERVICE $5.000A0 RATING MAINTENANCE FEES
144019 NEAL SUPPLY CO. $141,14 PLUMBING SUPPLIES
1"020 NETWORK GENERAL $7300 FREIGHT
144021 NEUTRON $1,741.26 CHEMICALS M.0.8-10-94
144022 CITY OF NEWPORT BEACH $25.15 WATER USE
144023 NORTEL COMMUNICATIONS $8.262.00 SERVICE AGREEMENT
144024 NORTH AMERICAN VAN LINES $2.607.63 SHIPPING CHARGES
144025 NUTTALL GEAR CORP. $30,690.62 MECHANICAL PARTS
1"026 THE OHMART CORP. $219.50 MECHANICAL REPAIRS
144027 ORANGE COUNTY AUTO PARTS CO. $137 77 TRUCK PARTS
1"028 ORANGE COUNTY FARM SUPPLY $249.44 PUMP
1"029 ORANGE COUNTY WHOLESALE $588.30 ELECTRIC PARTS
144030 ORANGE VALVE 8 FITTING CO. $826.46 FITTINGS
144031 COUNTY OF ORANGE $7.515.72 SERVICE AGREEMENT-RADIOS
1"032 COUNTY SANITATION DISTRICT $20,524.18 REIMBURSE WORKERS COMP
144033 COUNTY OF ORANGE $868.50 PERMIT FEES
144034 ORANGE COUNTY WATER DISTRICT $109.170.00 GAP WATER USE M.O.S.9-93
144035 PSI $88.20 TRUCK PARTS
1"036 PSSI $552.50 SEWER VIDEO INSPECTION
144037 PACIFIC PARTS $76.330.49 OFFICE EQUIPICOMPUTER SUPP.
1"038 PACIFIC PROCESS EQUIPMENT,INC. $187.63 PUMP PARTS
1M PACO PROCESS EQUIPMENT,INC. $385.75 PUMP PARTS
1T PACIFIC BELL C $1.407.05 TELEPHONE SERVICES
c c c
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 3/3W95 PAGE 4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0105195 POSTING DATE OV05195
WARRANT NO. VENDOR AMOUNT
144041 PACIFIC WATER CONDITIONING CO. E299.00 EQUIPMENT RENTALS
144042 PARAGON CABLE $36.78 CABLE SERVICES
144043 PARALLAX EDUCATION $9,680.00 TRAINING REGISTRATION
144044 PARKER DIVING SERVICE $25,000.00 EMERGENCY OCEAN OUTFALL REPAIRS
1M045 R.F.PAULUS,INC. $14,051.40 SEWER REPAIRS
144046 PEERLESS WIPING MATERIALS $585.69 JANITORIAL SUPPLIES
144047 PIMA ORO SYSTEMS,INC. $114.242.41 RESIDUALS REMOVAL M.O.5-84I1
144048 POHLSON,MOORHEAD B GOETHALS $1,353.00 LEGAL FEES-CALIOSHA INVEST.
144049 POWER DESIGN $944.54 INSTRUMENT PARTS
144050 PROFESSIONAL SERVICE IND. $44.00 SOIL TESTING
144051 PROFESSIONAL TREE CARE $3.950.00 GROUNDSKEEPING SUPPLIES
144052 PROMINENT FLUID CONTROL $1,590.00 RENTAL EQUIPMENT
>< 144053 RPM ELECTRIC MOTORS $3,285.18 ELECTRIC MOTOR PARTS
m 144054 JIM REED PHOTOGRAPHY $2.477.13 PHOTOGRAPHIC SERVICES
�y 144055 REISH MARINE STUDIES,INC. $900.00 OCEAN MONITORING
144058 REMEDYTEMP $968.72 TEMPORARY PERSONNEL SERVICES
H 144057 ROSEMOUNT ANALYTICAL $215.59 INSTRUMENT PARTS
n 1M058 ROYCE PRODUCTIONS E905A0 PHOTOGRAPHIC SERVICES
c
144059 SANTA ANA ELECTRIC MOTORS $290.60 ELECTRIC PARTS
144060 SANTA FIE INDUSTRIALPUSTICS E1,1530.28 PLUMBING SUPPLIES
144061 SANWABANK $17.192.83 CONSTRUCTION RETENTION 14-14A
144052 SCHULER ENGINEERING CORP. $07.194.02 CONSTRUCTION 5-36
144083 SCHWIND AMERICA $717.28 MECHANICAL PARTS
144064 SEA COAST DESIGNS E396.82 OFFICE FURNITURE
144065 SETCOM CORP. $73.25 INSTRUMENT PARTS
144068 SHAMROCK SUPPLY $410.42 SAFETY SUPPLIES
144057 SHURELUCK SALES E2,044.45 TOOLSAIARDWARE
144068 SIEVERS INSTRUMENTATION $116.00 LAB SUPPLIES
144D59 SKYPARK WALK-IN MEDICAL CLINIC $45.00 PRE-EMPLOYMENT PHYSICAL EXAMS
144070 SMITH-EMERY CO. E10.00 SOIL TESTING M.O.7-13.94
144071 SO COAST AIR QUALITY $4.256.49 PERMIT FEES
144072 SO CALIF.EDISON CO. $62,080.61 POWER
144073 SO.CAL.GAS.CO. $58.175.23 NATURAL GAS
144074 SO.CALIF.WATER CO. E60.43 WATER USE
1"075 SOUTHERN COUNTIES OIL CO. E8,014A4 DIESELAINLEADED FUEL
144076 STATE STREET BANK E3,500.00 TRUSTEE SERVICES
144077 GARY G.STREED $5,134.64 REIMS.PETTY CASH,TRAINING B TRAVEL
144078 SUMMIT STEEL $3,378.05 METAL
144079 SUNSET FORD $398.44 TRUCK PARTS
144080 SUPER CHEM CORP. $414.52 CHEMICALS
1"081 THOMAS FISH CO. $239.50 LAB SUPPLIES
144082 THOMPSON INDUSTRIAL SUPPLY $1.417.63 MECHANICAL PARTS
144083 TONER SYSTEM INTERNATIONAL $1,500.00 OFFICE SUPPLIES
144084 SO,CALIF.TRANE SERVICE $551.37 ELECTRICAL SUPPLIES
1440BS TRUESDAIL LABS $2,003.91 LAB SERVICES
144086 UNISOURCEBIOR BUTLER PAPER $1,193.33 OFFICE SUPPLIES
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 3/30/95 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/05/95 POSTING DATE 04/05/95
WARRANT NO. VENDOR AMOUNT
144087 UNITED PARCEL SERVICE 5280.93 PARCEL SERVICES
144088 UNITED SCIENTIFIC PRODUCTS $127.32 LAB SUPPLIES
144089 DATAVAULTSAJS SAFE DEPOSIT CO. $1,498.00 SAFE DEPOSIT BOX RENTAL
14409D VWR SCIENTIFIC $1,358.44 LAB SUPPLIES
144091 VALLEY CITIES SUPPLY CO. $405.13 PLUMBING SUPPLIES
144092 VARIAN ASSOCIATES,INC. $10,796.47 LAB EQUIPMENT
IU093 VERTEX SYSTEMS $3,155.01 COMPUTER DATA SUPPORT
1"094 CARL WARREN&CO. $494.99 INSURANCE CLAIMS ADMINISTRATOR
144095 WAXIE $2.164.08 JANITORIAL SUPPLIES
140096 WESTERN STATES CHEMICAL SUPPLY $37.015.28 CAUSTIC SODA&HYPOCHLORIDE M.O.8-12-92&4-13-94
1"097 WEST-LITE SUPPLY CO. $673.96 ELECTRIC SUPPLIES
N 144098 WESTRUX INTERNATIONAL $71,662.37 TRUCK PARTS
k 144099 WEST TECH $15,640.82 OFFICE EQUIPMENT
rxr 14410D ROURKE,WOODRUFF&SPRADLIN $47.752.52 LEGAL SERVICES M.O.2-19-92
144101 WOODWARD GOVERNOR CO. $3,138.00 MECHANICAL REPAIRS
H
144102 XEROX CORP. $11.333.88 COPIER LEASES
A
I 2,111,588.57
U
SUMMARY AMOUNT
01 OPER FUND $1.632.89
92 OPER FUND 5,324.87
#2 CAP FAC FUND 68,646.25
#3 OPER FUND 29,984.95
03 CAP FAC FUND 10,545.34
#5 OPER FUND 4,197.37
05 CAP FAC FUND 87.194.82
#6 OPER FUND 48.00
#7 OPER FUND 21,368.71
#7 CAP FAC FUND 9,376.83
011 OPER FUND 9,964.32
011 CAP FAC FUND 1/4,46IL44
#14 OPER FUND 688.00
#14 CAP PAC FUND 346,884.26
#5&6 OPER FUND 2.535.10
#6&7 OPER FUND 3.134.87
#7&14 OPER FUND 6,659.10
JT OPER FUND 716.812.54
CORE 477,196.45
SELF-FUNDED INSURANCE FUND 43.895.02
JT DIST WORKING CAPITAL 152,008.45
C .,111,5158.57
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 04/14/95 PAGE 1
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/19/BS POSTING DATE 04/19/95
WARRANT NO. VENDOR AMOUNT DESCRIPTION
144130 A-Z LOGIC SYSTEMS $412.86 COMPUTER REPAIRS
144131 ACCURATE MEASUREMENT SYST. $13.066.07 COMMUNICATION SUPPLIES
144132 ACCU-SLUDGE $479.80 LAB SUPPLIES
144133 ACOPIAN CORP. $132.54 INSTRUMENT SUPPLIES
144134 ADVANCO CONSTRUCTORS,INC. $90.071.23 CONSTRUCTION P1-38-1
144135 AIR LIQUIDE AMERICA CORP. $3.464.25 SPECIALTY GASES
144136 AIR PRODUCTS&CHEMICALS $19,037.20 O&M AGREEMENT OXY GEN.SYST.M.O.8-9-89
144137 ALLIED MODULAR BLDG.SYS. $175.00 BUILDING MODIFICATIONS
144138 AMERIDATA $13,229.55 OFFICE EQUIPMENT
144139 AMERICAN METAL BEARING CO. $2.495.00 MACHINE SUPPLIES
144140 AMSCO $837.04 SERVICE AGREEMENT
144141 ANAHEIM SEWER CONSTRUCTION $6,500.00 SEWER REPAIRS
L4 144142 ANALYSTS,INC. $2.902.52 MECHANICAL SUPPLIES
S 144143 ANTHONY PEST CONTROL $135.D0 SERVICE AGREEMENT
r+ 1441" A-PLUS SYSTEMS $522.06 NOTICES&ADS
w 144145 APPLIED BIOSYSTEMS,INC. $1.706.30 LAB SERVICES
H 144146 ACS(APPLIED COMPUTER SOLUTION) 543,721.72 FIBER OPTIC/OFFICE EQUIPMENT
144147 ABC LABORATORIES $2.160.00 LAB SERVICES
O 144148 ARROWHEAD ELECTRIC CORP. $430.29 ELECTRIC SUPPLIES
144149 ATKIWJONES COMPUTER SERVICE $321.30 SERVICE AGREEMENT
144150 AUTOMATIC DATA PROCESSING $3.669.16 PAYROLL SERVICES
1"151 BKK LANDFILL $2,222.76 RESIDUALS REMOVAL M.0.10-9-91
144152 BANANA BLUEPRINT $7,720.65 PRINTING M.0.11-07-94
1"153 BATTERY SPECIALTIES $1.422.68 BATTERIES
144154 BAXTER DIAGNOSTICS,INC. $1,916.81 LAB SUPPLIES
144155 BENTLY NEVADA $358.00 INSTRUMENT PARTS
144156 A BIEDERMAN,INC. $174.04 MECHANICAL PARTS
144157 DAVID BIHL $15.700.00 DEFERRED COMP WITHDRAWAL
144158 BIOMERIEUX VTLEK,INC. $670.22 LAB SUPPLIES
144159 BID TECH NET.INC. $260.60 COMPUTER SOFTWARE
144160 BISHOP COMPANY $201.65 TOOLS
144161 BLOOMBERG L.P. $4,832.59 FINANCIAL MONITORING M.0.4-14-93
144162 BOERINGER MANNHEIM $116.82 LAB SUPPLIES
144163 KEVIN BOJAN $193.82 REFUND USER FEE OVERPAYMENT
144164 BONA-RUES $393.68 TRUCK PARTS
144185 BOYLE ENGINEERING CORP. $21,211.18 ENGINEERING SERVICES P141
144166 BRENNER-FIEDLER&ASSOC.,INC. $88.47 LAB SUPPLIES
144167 BROWN&CALDWELL CONSULTANTS $18.531.81 ENGINEERING SERVICES J-19
144168 CH2M HILL $40.248.39 ENGINEERING SERVICES J-31
144169 C.L.TECHNOLOGY $720.00 GAS ANALYSIS SERVICES
144170 CS COMPANY $5,573.67 PLUMBING SUPPLIES
144171 CAD VENTURES $809.87 COMPUTER SOFTWARE
144172 CALTROL,INC. $80B.33 INSTRUMENT SUPPLIES
144173 CALIFORNIA AUTOMATIC GATE $100.00 SERVICE AGREEMENT
144174 CALTEX $2.502.00 JANITORIAL SUPPLIES
144175 CANUS CORPORATION $37.282.79 FIBRE OPTIC CABLE
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE OU14195 PAGE 2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0411995 POSTING DATE 04H9195
WARRANT NO. VENDOR AMOUNT
144176 JOHN CAROLLO ENGINEERS $21,145.54 ENGINEERING SERVICES P1.78,P1-36
1"177 CASI RUSCO,INC. $571.24 SECURITY CARD KEYS
144178 CENTURY SAFETY INST.8 SUPPLY 52,139.27 SAFETY SUPPLIES
144179 COAST FIRE EQUIPMENT $64.65 SERVICE AGREEMENT
144180 COASTALMOTION $1.332.00 MEMBERSHIP FEES
144181 COMMUNICATIONS PERFORMANCE GROUP $109.56 PUBLICATIONS
1N182 COMPRESSOR COMPONENTS OF CA $3,911.33 MECHANICAL PARTS
144183 COMPUSERVE $241.31 COMPUTER SERVICES
144184 CON-WAY WESTERN EXPRESS $115.00 FREIGHT CHARGES
144185 CONSOLIDATED FREIGHTWAYS $205.53 FREIGHT
144186 CONTINENTAL AIR TOOLS INC. $53.93 TOOLS
m 144187 CONONENTAL CHEMICAL CO. $1,616.25 CHLORINE MO.I0 11-93
S 144188 CONTINENTAL GRAPHICS $82.48 PRINTING
'+ 144189 COOPER CAMERON CORP. $2,160.60 INSTRUMENT PART
m 144190 COSTA MESA AUTO SUPPLY $372.38 TRUCK PARTS
144191 COUNTERPART ENTERPRISES $1,512.98 COMPRESSOR PARTS
.i 144192 COUNTY WHOLESALE ELECTRIC $1.442.97 ELECTRIC PARTS
0 1"193 CUMMINS-ALLISON CORP. $78.33 OFFICE SUPPLIES
N 144194 STATE OF CALIFORNIA $965.52 HAZARDOUS WASTE TAX
1"195 STATE BOARD OF EOUALIZATION $19D.83 UNDERGROUND FUEL STORAGE FEE
144196 DAILY PILOT $198.00 NOTICES 6 ADS
1"197 DE GUELLE 8 SONS GLASS CO. $183.44 GLASS REPAIRS
144198 DICKSONS $698.22 APPLIANCE
1"199 DIGITAL EQUIPMENT CORP. $230.71 OFFICE EQUIPMENT
144200 DISCO PRINT COMPANY $72.15 OFFICE SUPPLIES
144201 DOVER ELEVATOR COMPANY $940.00 ELEVATOR MAINTENANCE
1"202 DRESSER MEASUREMENT $2.088.82 ENGINE PARTS
144203 ROBERT F.DRIVER ASSOC. $5.400.00 PERSONNEL INSURANCE CONSULTANT
144204 DUNN EDWARDS CORP. $512.89 PAINT SUPPLIES
144205 ESP NORTH $195.45 MECHANICAL SUPPLIES
144206 EASTMAN.INC. $4,082.26 OFFICE SUPPLIES
1"207 ECOANALYSIS,INC. $1,603.50 CONSULTING SERVICES
144208 EDWARDS HIGH VACUUM INTER. $1,059.47 PUMP
144209 ELECTRO TEST,INC. $580.00 ELECTRIC SUPPLIES
144210 ENCHANTER,INC. $3.360.00 OCEAN MONITORING M.O.6-10.92
144211 ENSYS,INC. $166.54 LAB SUPPLIES
1M212 ENVIROGEN.INC. $3.138.00 LAB SERVICES
1"213 ENVIRONMENTAL SAMPLING SUPPLY $75.28 LAB SUPPLIES
144214 ENVIROTECKIWESTRONICS $186.00 INSTRUMENT PARTS
144215 FLUID TECH.SALES 5414.56 INSTRUMENT SUPPLIES
144216 FMC CORP. $33,100.12 HYDROGEN PEROXIDE M.O.9-1a34
1"217 MARSHALL FAIRRES $28.08 DEFERRED COMP DISTRIBUTION
144218 FALCON DISPOSAL SERVICE $7,552.50 RESIDUALS REMOVAL M.O. 10-9-91
144219 FEDERAL EXPRESS CORP. $30.50 AIR FREIGHT
14� FISHE SIENTIFIC CO. C $2.154.65 LAB SUPPLEISMENT
FUNDNO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE 041"S PAGES
REPORT NUMBERAP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/19/95 POSTING DATE 04/19/95
WARRANT NO. VENDOR AMOUNT
144222 FLAT&VERTICAL,INC. $252.00 CONCRETE CUTTING
144223 FLO-SYSTEMS $687.62 PUMP PARTS
1"224 FLYNN SIGNS&LETTERS $714.09 PRINTING
144225 FOUNTAIN VALLEY CAMERA $221.21 PHOTO SUPPLIES
144226 CITY OF FOUNTAIN VALLEY E7,842.OB WATER USE
144227 THE FOXBORO CO. $646.67 OFFICE SUPPLIES
1"228 GST,INC. $10,391.34 OFFICE EQUIPMENT
144229 GANAHL LUMBER CO. S488.71 LUMBERMARDWARE
144230 GARRATT-CALLAHAN COMPANY $1.713.23 CHEMICALS
1"231 GATES FIBERGLASS INSTALLERS $7,407.50 FIBERGLASS PARTS
144232 GENERAL TELEPHONE CO. $7,178.56 TELEPHONE SERVICES
144233 GOVT FINANCE OFFICERS ASSOC. $113.88 PUBLICATIONS
x 144234 WIN GRAINGER.INC. $252.44 ELECTRIC PARTS
m 144235 GREAT LAKES INSTRUMENTS,INC. $157.62 INSTRUMENT PARTS
144236 DGA CONSULTANTS $3.549.00 SURVEYING SERVICES M.O.8-0-94
144237 DAVID R.GRIFFIN $126.507.17 LEGAL SERVICES-TECHITE PIPE M.0.9-14-94
H IM238 HACH COMPANY 30.54 CHEMICALS
0 1"239 HARBOUR ENGINEERING $2,380.87 PUMP PARTS
w
144240 FREDAHARPER 51.100.00 DEFERRED COMP DISTRIBUTION
144201 HARRINGTON INDUSTRIAL PLASTIC S495.18 PLUMBING SUPPLIES
144242 HART GRAPHICSMETWARE 615.50 PUBLICATION
1"243 WATCH&KIRK,INC. S6151)4.50 TRUCK PARTS
1"244 HAULAWAY CONTAINERS $1,650.00 CONTAINER RENTALS
144245 PL HAWN CO.INC. $697.57 FILTER SUPPLIES
1"246 HERESITE PROTECTIVE COATINGS $158.77 ELECTRIC PARTS
144247 HERTZ CLAIM MANAGEMENT $2.083.33 WORKERS COMP CLAIMS ADMIN.
W248 HEWLETT PACKARD S3,40TU LAB SUPPLIES
1"249 HILTI,INC. S08.78 TOOLS
141250 HOLMES&NARVER,INC. $28.712.89 ENGINEERING SERVICES 2-14-5-112
/44251 HOME DEPOT $144.15 HARDWARE
144252 RS HUGHES CO,INC. S884.76 PAINT SUPPLIES
1"253 CITY OF HUNTINGTON BEACH $20.33 WATER USE
144254 HUNTINGTON VALLEY SCHWINN $274.44 BICYCLE PARTS
144255 ORANGE COUNTY FED CREDIT UNION $650.00 DEFERRED COMP DISTRIBUTION
144256 IPCO SAFETY $6,158.82 SAFETY SUPPLIES
144251 ITT FLUID TRANSFER DIV. $1,327.20 MECHANICAL PARTS
1"258 IMAGING PLUS,INC. $388.78 PRINTING SUPPLIES
144259 IMPERIAL WEST CHEMICAL 564.946.10 FERRIC CHLORIDE M.0.11-18-92
144260 INDUSTRIAL THREADED PRODUCTS $852.10 CONNECTORS
144261 INORGANIC VENTURES,INC. $250.15 LAB SUPPLIES
144262 INTERSTATE BATTERY SYSTEMS S1,397.37 BATTERIES
144263 IRVINE RANCH WATER DISTRICT S44.49 WATER USE
144Z64 J2 PRINTING SERVICES $49.57 OFFICE SUPPLIES
144265 J.D.I.TECHNOLOGIES,INC. $466.29 PRINTING SUPPLIES
144266 JAMISON ENGINEERING $1,241.90 CONSTRUCTION SERVICES
1"267 GREAT WESTERN SANITARY SUPPLY. $797.80 JANITORIAL SUPPLIES
FUNDING 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 04114/95 PAGE 4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/19/95 POSTING DATE 04119195
WARRANT NO. VENDOR AMOUNT
144258 JENSEN INSTRUMENTS CO. $56.70 INSTRUMENT PARTS
144269 JOHNSON POWER $14,250.00 MECHANICALPARTS
1"270 JOHNSTONE SUPPLY $381.35 ELECTRIC PARTS
1"271 JONES INDUSTRIAL HARDWARE CO. $12.24 SAFETY SUPPLIES
144272 KAHL SCIENTIFIC INSTRUMENTS $1,037.66 LAB SUPPLIES
144273 KEYE PRODUCTIVITY CENTER $278.00 TRAINING REGISTRATION
144274 KING BEARING,INC. $317.82 MACHINE SUPPLIES
144275 KIPLINGER $73.00 SUBSCRIPTION
144276 KNOX INDUSTRIAL SUPPLIES $2.121.80 TOOLS
144277 LAMOTTE COMPANY $109Ji0 LAB SUPPLIES
144278 LAIDLAW ENVIRONMENTAL SERVICES $3.016.36 WASTE DISPOSAL
m 144279 LAW/CRANDAL,INC. $9,875.00 LEGAL SERVICES M.O.7-13.94
S 144280 LEARN KEY $104.95 TRAINING REGISTRATION
144281 LEE&RO CONSULTING ENGR. $6,636.06 ENGINEERING SERVICES P140-1
m 144282 LORAIN PRODUCTS $1,317.75 SERVICE AGREEMENT
144283 MPS $340.27 PHOTOGRAPHIC SERVICES
H 144284 MARGATE CONSTRUCTION,INC. $389,662.00 CONSTRUCTION P242.2
e 144285 MARVAC DOW ELECTRONICS $561.94 INSTRUMENT SUPPLIES
0 144286 DONALD F.MCINTYRE 5287.25 CELLULAR TELEPHONE CHARGES
144287 MCWELCO RACK-N-BOX CO. $1.471.00 TOOLBOX
144288 MEDLIN CONTROLS CO. $347.68 INSTRUMENT SUPPLIES
144289 MEMBREX $618.79 LAB SUPPLIES
144290 MICROSICS CORPORATION 5462.07 LAB SUPPLIES
1"291 MIDWAY MFG.&MACHINING $6,415.00 MECHANICAL REPAIRS
144292 MILLTRONICS $432.45 INSTRUMENT SUPPLIES
1"293 MISSION INDUSTRIES $3.223.70 UNIFORM RENTALS
144294 NASCO WEST,INC. $257.89 LAB SUPPLIES
IM295 NATIONAL BAG CO. $49.70 LAB SUPPLIES
144296 NATIONAL CIVIC LEAGUE $155.25 PUBLICATION
144297 NEAL SUPPLY CO. $3.556.51 PLUMBING SUPPLIES
144298 NEUTRON $3,498.28 CHEMICALS M.O.&10-94
144299 CITY OF NEWPORT BEACH $5.29 WATER USE
144300 NORMS REFRIG.&ICE EQUIP. $118.57 ELECTRIC SUPPLIES
144301 NORTEL COMMUNICATIONS SYSTEMS $165.82 TELEPHONE SYSTEM PARTS
144302 GRASEBY/NUTECH $721.40 LAB SUPPLIES
144303 OCCUPATIONAL VISION SERVICES 5231.25 SAFETY GLASSES
144304 OFFICIAL AIRLINE GUIDE $142.00 SUBSCRIPTION
144305 ORANGE COUNTY AUTO PARTS CO. $160.85 TRUCK PARTS
144306 ORANGE COUNTY CHEMICAL $1.068.60 CHEMICALS
144307 ORANGE COUNTY WHOLESALE $28,606.01 ELECTRIC PARTS
144308 ORANGE COURIER $133.65 COURIER SERVICES
144309 ORANGE VALVE&FITTING CO. 52,167.56 FITTINGS
144310 OXYGEN SERVICE $9,420.03 SPECIALTY GASES
1"311 COUNTY OF ORANGE $4,595.00 DATA PROCESSING SERVICES
1M OC EMPL RETIREMENT SYSTEM $45.198.80 RETIREMENT SYSTEM PAYMENT
1 COUNTY SANITATION DISTRICT $7.538.59 REIMBURSE WORKERS COMP
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 04/14/95 PAGE 5
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0411SMS POSTING DATE DWISM5
WARRANT NO. VENDOR AMOUNT
144314 PSI 8129.30 HARDWARE
144315 PACIFIC PARTS $11,169,07 OFFICE EQUIPMENT
144316 PACIFIC BELL $1665 TELEPHONE SERVICES
144317 PAK WEST $2.457.24 JANITORIAL SUPPLIES
144316 PARALLAX EDUCATION $9.680.00 TRAINING REGISTRATION
144319 PARTS UNLIMITED $871.37 TRUCK PARTS
144320 PASCAL B LUDWIG,INC. $95.990.40 CONSTRUCTION P1-38-2
1"321 PASCALANDLUDWIG $12.713.00 CONSTRUCTION P2d34
144322 PATTEN CORP/TAYLOR INSTR. $576.63 OFFICE SUPPLIES
144323 R.F.PAULUS,INC. $23,545.12 SEWER REPAIRS
144324 PEABODY $1.443.68 PUMP
m 1"325 PERMA SEAL $182.86 INSTRUMENT SUPPLIES
x 144326 PHARMACIA BIOTECH,INC. $331.39 LAB SUPPLIES
is. 144327 PIMA GRO SYSTEMS,INC. $130,527.60 RESIDUALS REMOVAL M.O.5$91
m 144328 PIONEER STANDARD ELECTRONICS $5.118.41 COMMUNICATIONS SUPPLIES
y 1"329 POLY ENTERPRISES,INC. $694.99 SAFETY SUPPLIES
144330 POLYPURE,INC. $36,567.93 CATIONIC POLYMER M.O.3-11-92
O 144331 PUBLIC FINANCIAL MGMT.,INC. $60,273.37 FINANCIAL CONSULTING SERVICES M.O.6A-94
u 144332 PULSAFEEDER $478.77 PUMP PARTS
1"333 RD SYSTEMS,INC. $767.94 OFFICE EQUIPMENT
144334 RPM ELECTRIC MOTORS $250.51 ELECTRIC MOTOR PARTS
144335 R 8 R INSTRUMENTS E67.65 INSTRUMENT
144336 RAINBOW DISPOSAL CO. $1.715.43 TRASH REMOVAL
144337 RAININ INSTRUMENT CO. $135.85 LAB SUPPLIES
144338 REISH MARINE STUDIES,INC. $1,48D.00 OCEAN MONITORING
144339 REMEDYTEMP S1,3D9.13 TEMPORARY PERSONNEL SERVICES
144340 MCJUNKIN-REPUBLIC SUPPLY $3.109.40 PLUMBING SUPPLIES
144341 REVELATION TECHNOLOGIES $233.50 OFFICE EQUIPMENT
144342 REWES ENGINEERING CO. $801.19 CONSTRUCTION SUPPLIES
144343 RM MEASUREMENT AND CONTROL $8,691.86 INSTRUMENT SUPPLIES
144344 ROCHESTER MIDLAND CORP. $13.100.32 CHEMICALS
1W1345 ROAN ENGINEERING CO. $283.83 OFFICE EQUIPMENT
144346 ROSEMOUNT,INC. $328.25 INSTRUMENT PARTS
144347 SANTA ANA ELECTRIC MOTORS $703.35 ELECTRIC PARTS
144348 SANTA FE INDUSTRIAL PLASTICS $320.95 PLUMBING SUPPLIES
144349 SCOTT SPECIALTY GASES,INC. $754.59 SPECIALTY GASES
1"350 CRY OF SEAL BEACH S27L00 WATER USE
144351 SHURELUCK SALES $3.059.27 TOOLSRIARDWARE
144352 SMITH PIPE B SUPPLY $121.63 PLUMBING SUPPLIES
1M353 SO COAST AIR QUALITY $101.20 PERMIT FEES
144354 SO CALIF.EDISON CO. $2,538.95 POWER
1"355 SO.CAL.GAS.CO. $12.768.05 NATURAL GAS
144356 SOUTHERN COUNTIES OIL CO. 8437.36 DIESEL/UNLEADED FUEL
144357 SPARKLETTS DRINKING WATER $2,656.77 DRINKING WATERICOOLER RENTALS
144358 WESTALLOY,INC. 6770.75 WELDING SUPPLIES
144359 STRATAGENE $303.08 LAB SUPPLIES
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 0411095 PAGE 6
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/19/95 POSTING DATE 04/19/95
WARRANTNO. VENDOR
144360 GARY G.STREED $520.83 REIMB.PETTY CASH,TRAINING&TRAVEL
144361 SUMMIT STEEL $926.27 METAL
144362 SUNSET FORD $326.87 TRUCK PARTS
144363 SUPER CHEM CORP. $343.51 JANITORIAL SUPPLIES
144364 SUPER POWER PRODUCTS $155.16 JANITORIAL SUPPLIES
144385 TAYLOR-DUNN MFG.COMPANY $1,951.82 ELECTRIC CART PARTS
144366 TEKMAR COMPANY $314.79 LAB SUPPLIES
144367 TEKTRONIX,INC. $631.81 LAB SUPPLIES
144388 TIRE WAREHOUSE $512.85 TRUCK PARTS
144369 TROPICAL PLAZA NURSERY,INC. $5,905.84 CONTRACT GROUNDSKEEPING M.O.5-11-94
144370 TRUCK 8 AUTO SUPPLY,INC. $584.01 TRUCK PARTS
144371 TRUESDAIL LABS $633.00 LAB SERVICES
1"372 UNISOURCEWOR BUTLER PAPER $325.47 OFFICE SUPPLIES
144373 UNITED PARCEL SERVICE $118.33 PARCEL SERVICES
r+ 144374 VWR SCIENTIFIC $1.495.73 LAB SUPPLIES
m 144375 VALLEY CITIES SUPPLY CO. $1,248.87 PLUMBING SUPPLIES
1"376 VARIAN ANALYTICAL INSTRUMENTS 52,327.97 FREIGHT
H 144377 VERTEX COMPUTER CABLE PRODUCTS $1.205.95 COMPUTER CABLE SUPPLIES
1"378 VERTEX SYSTEMS $3,816.50 COMPUTER DATA SUPPORT
a 144379 CARL WARREN&CO. $294.28 INSURANCE CLAIMS ADMINISTRATOR
144380 WESTERN STATES CHEMICAL SUPPLY $48,950.87 CAUSTIC SODA B HYPOCHLORIDE M.0.8-12-9284.13-94
144381 WEST-LITE SUPPLY CO. $328.58 ELECTRIC SUPPLIES
144382 JOHNSON YOKOGAWA CORP. $144.46 INSTRUMENT SUPPLIES
144383 RICHARD B.EDGAR $200.00 DEFERRED COMP DISTRIBUTION
1,031,524.42
n
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 04114195 PAGE 7
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMSPAID04119/95 POSTING DATE 04N9195
SUMMARY AMOUNT
#1 OPERFUND $335.89
#2 OPER FUND 1,567.96
02 CAP FAC FUND 28,724.87
03 OPER FUND 14,650.33
#3 CAP FAC FUND 149,052.93
#5 OPER FUND 4,588.98
05 CAP FAC FUND 20.46
#6 OPER FUND 238.02
07 OPER FUND 19,542.64
07 CAP FAC FUND 32.16
M 011 OPER FUND 4.159.91
k #11 CAP FAC FUND 24.74
H #13 OPER FUND 68.01
014 CAP FAC FUND SAM."
y #7&14 OPER FUND 891.17
JT OPER FUND 453.598.86
CORP 831,772.06
v SELF-FUNDED INSURANCE FUND 9.916.20
JT DIST WORKING CAPITAL 306,703.65
1.831.524.42
f
9r JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (9): consideration of roll wll vote motion ratifying
payment of claims of the joint and individual
Districts (each Director shall be called only once
and that vote will be regarded as the same for each
District represented unless a Director expresses a
desire to vote differently for any District).
Summary
See attached listing of claim payments.
Recommendation
Staff recommends approval of payment of claims listing.
��wwooaa�cesosw
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE 03N7N5 PAGE6
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 03/08/95 POSTING DATE 03108/95
SUMMARY AMOUNT
91 OPER FUND $5,096.65
92 OPER FUND 23,340.18
92 CAP FAC FUND 359.084.39
93 OPER FUND 63.800.74
93 CAP FAC FUND 60,974.76
95 OPER FUND 10.599.16
96 OPER FUND 271.79
97 OPER FUND 4,922.22
97 CAP FAC FUND 280.00
911 OPER FUND 13.887.30
611 CAP FAC FUND 4036757
#14 OPER FUND 2,203.01
914 OAP FAC FUND
95860PER FUND 3,339.60 $227
9687 OPER FUND 694694
97814 GRER FUND 7.749 M 7, .01 94
JT OPER FUND 1.045.932.70 5235.442.95
CORP 245.680.50
SELF-FUNDED INSURANCE FUND 15.107.62
JT DIST WORKING CAPITAL 243,761.50
$2,824,935.58
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 03/18/95 PAGE 7
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0=2195 POSTING DATE 0=2/95
SUMMARY AMOUNT
92 OPER FUND $200.00
02 CAP FAC FUND 19.774.43
93 OPER FUND 31,883.67
93 CAP FAC FUND 8,526.90
05 OPER FUND 9.085.45
06 CAP FAC FUND 535.00
07 OPER FUND 1,707.35
07 CAP FAC FUND 23,100.11
911 OPER FUND 907.35
#14 CAP FAC FUND 2.575.00 9588 CAP FAC FUND 211. $2�$7$.OU
- OU2.50 575.17
9887 OPER FUND 453.80
OPER FUND 691.17
JT OPER FUND 544,000.97 35 ,266.17
CORF 454,079.43
SELF-FUNDED INSURANCE FUND 30,723.78
.IT DIST WORKING CAPITAL 435,300.28
$1.613.346.19
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 3/30195 PAGE 5
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/05/95 POSTING DATE 04/05/95
WARRANT NO. VENDOR AMOUNT
144087 UNITED PARCEL SERVICE $280.93 PARCEL SERVICES
144088 UNITED SCIENTIFIC PRODUCTS 8127.32 LAB SUPPLIES
144089 DATAVAULTS/US SAFE DEPOSIT CO. $1.498.00 SAFE DEPOSIT BOX RENTAL
144090 VWR SCIENTIFIC $1.358.44 LAB SUPPLIES
144091 VALLEY CITIES SUPPLY CO. $405.13 PLUMBING SUPPLIES
144092 VARIAN ASSOCIATES,INC. $10.796.47 LAB EQUIPMENT
144093 VERTEX SYSTEMS $3,155.01 COMPUTER DATA SUPPORT
144094 CARL WARREN&CO. $494.99 INSURANCE CLAIMS ADMINISTRATOR
144095 WAXIE $2.164.08 JANITORIAL SUPPLIES
144096 WESTERN STATES CHEMICAL SUPPLY $37,016.28 CAUSTIC SODA&HYPOCHLORIDE M.O.8-12-92&4-13-94
144097 WEST-LITE SUPPLY CO. $673.96 ELECTRIC SUPPLIES
144098 WESTRUX INTERNATIONAL $71,602.37 TRUCK PARTS
144099 WESTTECH $15.640.82 OFFICE EQUIPMENT
144100 ROURKE,WOODRUFF&SPRADLIN $47.752.52 LEGAL SERVICES M.0.2-19.92
144101 WOODWARD GOVERNOR CO. 33,138.00 MECHANICAL REPAIRS
144102 XEROX CORP. $11,333.88 COPIER LEASES
2,111,568.57
SUMMARY AMOUNT
#1 OPER FUND $1.632.89
02 OPER FUND 6,324.87
02 CAP FAC FUND 68,646.25
03 OPER FUND 29,954.95
03 CAP FAC FUND 10.545.34
05 OPER FUND 4,197.37
05 CAP FAC FUND 87,194.82
#6 OPER FUND 48.00
#7 OPER FUND 21.368.71
97 CAP FAC FUND 9.376.83
#11 OPER FUND 9,984.32
011 CAP FAC FUND 114,489.41.
014 OPER FUND BB8.00 $347,572.25
014 CAP FAC FUND 946 884 25 I 6,659.10
05&6 OPER FUND 2,535.10
06&7 OPER FUND 3,134.87 5354,231.35
L N814 OPER FUND_ 6,859.10
JTOPERFUND 715,812.54
CORP 477,198.45
SELF-FUNDED INSURANCE FUND 43,898.02
JT DIST WORKING CAPITAL 152.008.45
2,111,568.57
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 04/14/95 PAGE 7
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 04/19195 POSTING DATE 04/19/95
SUMMARY AMOUNT
#1 OPER FUND $335.89
92 OPER FUND 1,567.96
02 CAP FAC FUND 28,724.87
#3 OPER FUND 14,659.33
03 CAP FAC FUND 149,052.93
#5 OPER FUND 4,588.98
#5 CAP FAC FUND 20.46
#6 OPER FUND 238.02
#7 OPER FUND 19,542.64
#7 CAP FAC FUND 32.16
#11 OPER FUND 4,159.91
III CAP FAC FUND 24.74
#13OPERFUND 88.01 $ 68.01
#14 CAP FAC FUND 5,826.77 5,826.77
#7814 OPER FUND 691.17 691.17
POP FU D 453,598.66
CORF 831,772.06 6
SELF-FUNDED INSURANCE FUND 9,916.20 585.�95
-
,IT DIST WORKING CAPITAL 306.703.66
1,831,524.42
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 511195 PAGE 1
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05AGI95 POSTING DATE 05/03195
WARRANT NO. VENDOR AMOUNT DESCRIPTION
144404 AG TECH COMPANY $2M.B09.40 RESIDUALS REMOVAL N.C.Mb Tl
144405 ABU $174.46 LAB SUPPLIES
144406 ATM PA,INC. $200.00 LAB SERVICES
144407 A T&T-UNIPLAN SERVICE $2.411.11 LONG DISTANCE TELEPHONE SERVICES
144408 AT&T-MEGACOMSERVICE SIBB42 LONG DISTANCE TELEPHONE SERVICES
144409 ACCURATE MEASUREMENT SYS. 324.9B1.2B COMMUNICATION SUPPLIES
144410 ACOPIAN CORP. $042.50 INSTRUMENTPARTS
144411 ADVANCED COOLING TECHNOLOGIES $113." ELECTRIC PARTS
144412 ADVANCO CONSTRUCTORS,INC. $93.025.00 CONSTRUCTION P141-1
144413 AEROCHEM.INC. $3.350.64 REFUND USER FEE OVERPAYMENT
144414 AIR PRODUCTS&CHEMICALS $18,03720 OSM AGREEMENT OXY GEN.SYST.M.O.&989
1M416 ALLIED SUPPLY CO. E1,206.43 VALVE PARTS
144415 AMERIDATA $1,004,23 OFFICE EQUIPMENT
14 17 AMERICAN WATERWORKS $81.00 MEMBERSHIP DUES
144419 AMICON,INC. $750.90 LAB SUPPLIES
14M19 ANI%TER-DISTRIBUTION $217.75 OFFICE EQUIPMENT
144420 ANTHONY PEST CONTROL $19500 SERVICEAGREEMENT
1"421 APPLIED BIOSYSTEMS,INC. E2.619.99 LAB SUPPLIES
144422 ARROWHEAD ELECTRIC CORP. $59.53 ELECTRIC SUPPLIES
144423 ARTS DISPOSAL SERVICE,INC. S694A0 WASTE REMOVAL
144424 ASBURY ENVIRONMENTAL SERV. $65.00 WASTE OIL REMOVAL
1N 25 ASSOCIATED VACUUM TECH.INC. $252.35 COMPRESSOR PARTS
144425 ATKIWJONES COMPUTER SERVICE $321.30 SERVICEAGREEMENT
144427 AVNET COMPUTER 31B2,027.99 COMPUTER EQUIPMENTM0.24-95
144420 AWARDS TROPHIES $310.85 PLAQUES
144429 BFI MEDICAL WASTE SYSTEMS $4.00 LAB SERVICES
144430 BKK LANDFILL $2,411.0 RESIDUALS REMOVAL M.0.1&9.91
144431 BRW SAFETY B SUPPLY $145.43 SAFETYSUPPLIES
144432 BATTERY SPECIALTIES $602.01 BATTERIES
144433 SAUERCOMPRESSOR $137.39 COMPRESSOR PARTS
I4 m BAXTER DIAGNOSTICS,INC. $1,500.57 LAB SUPPLIES
144435 BECKMAN INSTRUMENTS $380.76 LAB SUPPLIES
1"436 J&H BERGE.INC. $259.45 LAB SUPPLIES
144437 BETA TECHNOLOGIES $152.29 INSTRUMENT PARTS
144438 BOLSA RADIATOR SERVICE $M7.97 TRUCKREPAIRS
IM439 SON-A-RUES 397.33 TRUCK PARTS
144440 BRONSON,BRONSON&MCKINNON $971.30 LEGAL SERVICES-COUNTY BANKRUPTCY M.O.128-W
144441 BUDGET JANITORIAL $3.330.00 JANITORIAL SERVICES
144442 BURKE ENGINEERING CO. $554.54 ELECTRIC SUPPLIES
144443 BUSH&ASSOCIATES,INC. $1.062.00 SURVEYING SERVICES MO.&&94
144444 CADIRECT10N $269.38 OFFICE EOUIPMENT
1"445 CALTROL,INC. $784.57 INSTRUMENT PARTS
1""0 CALFON CONSTRUCTION S85.00 PUN 8 SPEC,REFUND
144447 CALIF ASSOC.OF SAN.AGENCIES 3s=w MEMBERSHIP DUES M 0.141-95
14444E CALIFORNIAAUTOMATICGATE $115.00 SERVICE AGREEMENT
1""9 CANUS CORPORATION $SI.M.BS FIBER OPTIC CABLE
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 51195 PAGE
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID OSXQ195 POSTING DATE 05 5
WARRANT NO. VENDOR AMOUNT
114450 JOHN CAROLLO ENGINEERS E13,094.26 ENGINEERING SERVICES Pl-388 OCEAN 0LITFALL
IW51 CENTURY PAINT $215.88 PAINT SUPPLIES
1W52 CENTURY SAFETY INST.&SUPPLY $1,243.99 SAFETY SUPPLIES
14 53 CERFNET $68.84 COMPUTERSERVICES
144054 CHANDLER LIQUID ASSET MGMT. 58,400.00 INVESTMENT CONSULTANT MO 2.&95
144455 CHEM SERVICE,INC. $132.69 LAB SUPPLIES
14N58 CHEMYVEST,INC. $418.27 PUMP PARTS
1"457 CLONTECH LABORATORIES,INC. $146.38 LAB SUPPLIES
144059 COUCHANDSONS $1.147.50 CONSTRUCTION 2-9-Rt
144459 COUCH&SONS $30,657.94 CONSTRUCTION 11-17.1
144460 COMPUSERVE $266.43 COMPUTER SERVICES
14401 CON-WAY WESTERN EXPRESS $60.47 FREIGHT CHARGES
144462 CONVERSE CONSULTANTS O C $3,862.40 CONSULTING SERVICES M.O.&11-93
14N63 COOPER CAMERON CORP. $327.73 INSTRUMENT PARTS
1444" COORDINATED EQUIP CO.,INC. 5175.OD MECHANICAL PART
1"465 COSTA MESA AUTO SUPPLY $235.27 TRUCK PARTS
144066 COUNTY WHOLESALE ELECTRIC $214.66 ELECTRIC PARTS
144467 CA DEPT.OF HEALTH SERVICES $3,493.00 TRAINING REGISTRATION
140468 DELTA DENTAL PLAN OF CALIF. 558,2Bi.47 DENTAL INSURANCE PLAN W0.1-12-94
144499 DIGITALEQUIPMENTCORP. $8.091.90 SERVICEAGREEMENTS
144470 DISCO PRINT COMPANY $".a OFFICE SUPPLIES
144471 DOVER ELEVATOR COMPANY 5940.00 ELEVATOR MAINTENANCE
144472 DUNN EDWARDS CORP. $379.06 PAINTSUPPUES
IwT3 E.C.S. $167.00 PUBLICATION
14 74 EASTMAN.INC. $1,065.96 OFFICE SUPPLIES
141475 ENCHANTER,INC. $3.920.00 OCEAN MONITORING M.O&1&92
144476 ENVIRONMENTAL RESOURCE ASSOC. $7511M LAB SERVICES
1444" ERNST B YOUNG 517,690.00 REVIEW OF FINANCE DEM.M.0.9-14-94
144478 EXXON CO. $8.07.56 REFUND USER FEE OVERPAYMENT
144079 FLUID TECH.SALES $413.61 INSTRUMENT SUPPLIES
144480 FMC CORP. S%,170.96 HYDROGEN PEROXIDE M.O.9-1d94
144481 FST SAND AND GRAVEL.INC. $266.25 ROAD BASE MATERIALS
144482 FALCON DISPOSAL SERVICE E335.00 RESIDUALS REMOVAL M.D.10-&91
144483 FEDERAL EXPRESS CORP. $529.75 AIR FREIGHT
144484 FISHER SCIENTIFIC CO. 5289.79 LAB SUPPLIES
IW85 FLO-SYSTEMS,INC. $188.33 PUMPPARTS
144486 FOUNTAIN VALLEY CAMERA $72.02 PHOTO SUPPLIES
I W87 GST,INC. $4.681.17 OFFICE EQUIPMENT
10N88 GTE TELEPHONE OPERATIONS 5300.00 TELEPHONE CABLE SERVICES
1M469 GAUGE REPAIR SERVICE $1,730.21 INSTRUMENT PARTS
144490 GIERUCHAUTCHELL,INC. $2.01.15 PUMP PARTS
144491 GA INDUSTRIES,INC. $1,539.00 PLUMBING SUPPLIES
144492 GRAHAM COMPANY 5400.00 INSTRUMENT PARTS
144493 DGA CONSULTANTS $5.500.00 SURVEYING SERVICES M.O.8 94
I"494 DAVIDM GRIFFITH&ASSOC. $1.106.27 PROF.SERVICES-EXEC.SEARCH
F14 95 HARBOUR ENGINEERING $10,399.58 PUMP PARTS
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE SI1/95 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/03/95 POSTING DATE 05I03/95
WARRANTNO. VENDOR AMOUNT
144496 HARRINGTON INDUSTRIAL PLASTIC $1.217.09 PLUMBING SUPPLIES
144497 PL HAM CO.INC. $32,054.66 INSTRUMENTS/INSTRUMENT PARTS M.0.3-10-93
144498 HEWLETT PACKARD $72.20 LAB SUPPLIES
144499 HIBINO USA,INC. $20,257.00 OFFICE EQUIPMENT
144500 HOME DEPOT $283.90 SMALL HARDWARE
144501 IRS HUGHES CO,INC. $1,280.19 PAINT SUPPLIES
144502 HYCLONE LABORATORIES,INC. $378.54 LAB SUPPLIES
144503 IPCO SAFETY $539,45 SAFETY SUPPLIES
1445N IMPERIAL WEST CHEMICAL $86.643.21 FERRIC CHLORIDE M.O.11-18-92
144WS INDUSTRIAL THREADED PRODUCTS $269.19 CONNECTORS
144506 INGERSOL-RAND EQUIP.CORP. $103.91 COMPRESSOR PARTS
144507 INTERMOUNTAIN SCIENTIFIC CORP. $227.59 LAB SUPPLIES
144508 INVITROGEN CORP. $299.76 LAB SUPPLIES
144509 J2 PRINTING SERVICES $1.164.78 PRINTING
1"510 JAMISON ENGINEERING $546.10 CONSTRUCTION SERVICES
144511 GREAT WESTERN SANITARY SUPPLY. $156.13 JANITORIAL SUPPLIES
144512 JENSEN INSTRUMENTS CO. $332.47 INSTRUMENT PARTS
1"513 JOHNSON CONTROLS,INC. $219.79 ELECTRIC SUPPLIES
144514 JOHNSTONE SUPPLY $395.18 ELECTRIC PARTS
144615 THE KEITH COMPANIES $248.10 ENGINEERING SERVICES 3.36R
144516 KING BEARING,INC. $304.99 MACHINE SUPPLIES
1"517 KNOX INDUSTRIAL SUPPLIES $1.238.01 TOOLSISAFETY SUPPLIES
144518 LADDER MAN,INC. $90.00 TOOLS
1"519 LAKEWOOD INSTRUMENTS $4.116.22 MECHANICAL PARTS
144520 LEARN KEY $54.95 TRAININGVIDEO
144521 K.P.LINDSTROM,INC. $9,738.43 CONSULTING SERVICES-ENVIR.M.0.12-9-90
144522 MBC APPLIED ENVIRONMENTAL $970.00 OCEAN MONITORING M.0.6-10-92
1"623 MPS $204.88 PHOTOGRAPHIC SERVICES
144524 MACOMCO $577.20 SERVICE AGREEMENT
1"525 MAINTENANCE PRODUCTS,INC. $654.52 MECHANICAL PARTS
144525 MARVAC DOW ELECTRONICS 5604.21 INSTRUMENT SUPPLIES
144527 MEDLIN CONTROLS CO. $485.03 GAUGES
144528 NATIONAL TECHNICAL INFO SVC. $250.00 SERVICE AGREEMENT
IM529 MISSION ABRASIVE SUPPLIES $236.51 HARDWARE
144530 MISSION INDUSTRIES $3.202.73 UNIFORM RENTALS
144531 MITCHELL INSTRUMENT CO. $138.00 ELECTRIC PARTS
144532 MLADEN BUNTICH CONSTRUCTION $108.107.57 CONSTRUCTION 14-IAA
144533 MOTEL 6#1256-1-C $1.933.18 REFUND USER FEE OVERPAYMENT
144534 NAT WEST MARKETS $750.00 INTEREST DRAW FEES
140535 NATIONAL PLANT SERVICES $2.500.00 VACUUM TRUCK SERVICES
1"536 NATIONAL SAFETY COUNCIL $140.70 SAFETY FILM RENTALS
1"637 NETWORK GENERAL $6.000.00 COMPUTER NETWORK CONSULTING
144638 NEUTRON $10,405.45 ANIONIC POLYMER M.0.8-1094
1"539 NEWARK ELECTRONICS 5545.78 INSTRUMENT PARTS
144540 NORMS REFIG.S ICE EQUIP. $20.81 ELECTRIC PARTS
1"541 OCCUPATIONAL VISION SERVICES $1,317.02 SAFETY GLASSES
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5H/95 PAGE 4
REMRT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 0570395 POSTING DATE 05I03M5
WARRANT NO. VENDOR AMOUNT
144542 OLYMPIC CREATIONS $851.22 OFFICE SUPPLIES
144543 ORANGE COUNTY AUTO PARTS CO. $187.55 TRUCK PARTS
144544 ORANGE COUNTY CHEMICAL $2.900.04 CHEMICALS
144545 ORANGE COUNTY WHOLESALE $9,584.81 ELECTRIC PARTS
144546 ORANGE VALVE 8 FITTING CO. 5540.52 FITTINGS
144547 OXYGEN SERVICE 53,194.66 SPECIALTY GASES
144548 COUNTY SANITATION DISTRICTS $15.520.66 REIMBURSE WORKERS COMP
144549 PGC SCIENTIFIC CORPORATION $721.48 LABSUPPLIES
1"550 PSI $237.74 HARDWARE
144551 PACIFIC PARTS $30,904.72 OFFICE EQUIPMENT
1"552 PAGENET $1,009.32 RENTAL EQUIPMENT
1"553 PARAGON CABLE 536.78 CABLE SERVICES
1"554 PARALLAX EDUCATION $7,238.00 TRAINING REGISTRATION
1"555 PARKHOUSE TIRE CO. $334.76 TIRES
144556 PERMA SEAL $546.02 INSTRUMENT SUPPLIES
1"557 COUNTY SANITATION DISTRICTS $3.148.88 REIMBURSE PETTY CASH,TRAINING fl TRAVEL
1"558 PIMA GRO SYSTEMS,INC. $109,220.93 RESIDUALS REMOVAL M.0.5&91
1"669 PIONEER STANDARD ELECTRONICS $8,029.43 COMPUTER SOFTWARE
1"560 PITNEY BOWES $M2.68 POSTAGE MACHINE SERVICE AGREEMENT
144561 POLY CAL PLASTICS,INC. $206.65 MECHANICAL PARTS
144562 POLYPURE,INC. $18.223.21 CATIONIC POLYMER M.O.3.11-92
144563 POWER DESIGN $29,395.28 OFFICE EQUIPMENT
1"564 POWER SYSTEMS $1,310.58 TRUCK PARTS
IMS65 PROFESSIONAL SERVICE IND. $2,128.00 SOIL TESTING
1"566 PUBLIC FINANCIAL MGMT.,INC. $10.278.70 FINANCIAL CONSULTING SERVICES M.O.6.8-94
144567 PRYOR REPORT $99.00 TRAINING REGISTRATION
1"568 RAHN INDUSTRIES $M7.03 ELECTRIC PARTS
10669 RED WING SHOES 5493.93 REIMBURSABLE SAFETY SHOES
t44A0 THE REGISTER $876.60 NOTICES B ADS
144571 REMEDYTEMP $4,083.21 TEMPORARY PERSONNEL SERVICES
144572 RICOH ELECTRONICS,INC. $17,748.19 REFUND USER FEE OVERPAYMENT
144573 RODNEY-HUNT CO. $563.88 MECHANICAL PARTS
144574 DR.ROOTER SERVICE $250.00 PLUMBING SERVICES
144575 SANTA ANA ELECTRIC MOTORS $3,464.M ELECTRIC PARTS
1"576 SANTA FIE INDUSTRIAL PLASTICS $221.88 PLUMBING SUPPLIES
W577 SANWA BANK $4.997.48 CONSTRUCTION RETENTION 14-1-1A
14457E DOUG SARVIS $750.00 CPRnRST AID TRAINING
144579 R.CRAIG SCOTT B ASSOC. $6.137.52 LEGAL SERVICES-PERSONNEL ISSUES
1"580 SERPENTOL CONVEYOR CORP. $3,123.12 MECHANICAL PARTS
144581 SHAMROCK SUPPLY $121.16 TOOLS
144582 LAWRENCE SHAPIRO.NO $135.80 MEDICAL CLAIM
144583 SHURELUCK SALES $1.333.09 TOOLSMARDWARE
144554 SOUTHERN COUNTIES OIL CO. $8,430.77 DIESELMNLEADED FUEL
1"565 SPEX INDUSTRIES,INC. $3W 22 LAB SUPPLIES
144586 STRATAGENE $730.77 LAB SUPPLIES
1"687 SUPELCO,INC. $08.24 LAB SUPPLIES
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/1/95 PAGE 5
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID O510395 POSTING DATE 05/03/95
WARRANT NO. VENDOR AMOUNT
144588 TEKMAR COMPANY $161.64 LAB SUPPLIES
1"589 CHARLES E.THOMAS $102.18 TRUCK PARTS
1M590 THOMAS BROS MAPS $3,798.19 PRINTING
1M591 THOMAS FISH CO. $586.25 LAB SUPPLIES
144592 TRAVEL EXECUTIVES $1,197.00 TRAVEL SERVICES M.O.6E-94
144593 TRUCK&AUTO SUPPLY,INC. $279.03 TRUCK PARTS
1M594 TRUESDAIL LABS $20,159.60 LABSERVICES
144596 U.S.AUTO GLASS CENTERS $150.86 TRUCK PARTS
144596 ULTRA SCIENTIFIC $507.00 LAB SUPPLIES
144597 UNISOURCE&/OR BUTLER PAPER $337.37 OFFICE SUPPLIES
144598 UNITED PARCEL SERVICE $237.88 PARCEL SERVICES
144599 VWR SCIENTIFIC $2,996.M LAB SUPPLIES
144600 VALIN CORPORATION $278.55 MECHANICAL SUPPLIES
144601 VALLEY CITIES SUPPLY CO. $2,830.87 PLUMBING SUPPLIES
144602 VANIER BUSINESS FORMS $1,114.71 OFFICE SUPPLIES
144603 VERTEX COMPUTER CABLE PRODUCTS $397.33 OFFICE EQUIPMENT
1M604 CARL WARREN&CO. $300.00 INSURANCE CLAIMS ADMINISTRATOR
1"W5 WATER ENVIRONMENTAL FED. $101.25 PUBLICATION
14460 i WATERS CORPORATION $92.28 LAB SUPPLIES
IMIX17 WATERUSE MEMBERSHIP $275.00 MEMBERSHIP DUES
144608 WESTERN STATES CHEMICAL SUPPLY 545,364.61 CAUSTIC SODA&HYPOCHLORIDE M.O.&12-92&4-13.94
144609 WEST-LIM SUPPLY CO. $254.73 ELECTRIC SUPPLIES
144610 CITY OFWESTMINSTER $4,281.25 MANHOLEAOJUSTING
144611 WIRTH GAS EQUIPMENT CO. $4,799.87 INSTRUMENT
1M612 ROURKE,WOODRUFF&SPRADLIN $66.253.92 LEGAL SERVICES M.O.2-19-92
144613 XEROX CORP. $12.006.27 COPIER LEASES
1M614 GEORGE YARDLEY CO. $663.77 HARDWARE
144615 JOHNSON YOKOGAWA CORP. $380.04 INSTRUMENT SUPPLIES
144616 RICKARD YOUNG PRODUCTS $145.26 TRAINING VIDEO
144617 ARAMARK SERVICES,INC. $17.44 OPERATING SUPPLIES
144618 GENERAL TELEPHONE CO. $298.19 TELEPHONE SERVICES
144619 MERRILL LYNCH CAPITAL MARKETS $72,616.M REMARKETING AGREEMENT
144620 PACIFIC BELL $1.215.62 TELEPHONE SERVICES
144821 MCJUNKIN-REPUBLIC SUPPLY $3.90 PLUMBING SUPPLIES
1M622 SO CALIF.EDISON CO. $34,623.16 POWER
1M623 SO.CAL.GAS.CO. $61,518.49 NATURAL GAS
1,769,947.87
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5H195 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05103095 POSTING DATE 05 195
SUMMARY AMOUNT
01 OPER FUND $7,065.63
82 OPER FUND 21.649.38
82 CAP FAG FUND 3,920.50
83 OPER FUND 38,065.61
93 CAP FAG FUND 17.315.67
85 OPER FUND 0.706.54
86 OPER FUND 4,672.65
97 OPER FUND 7.420.10
911 OPER FUND 10.899.90
611 CAP FAC FUND 31.116.31
913 OPER FUND 101.37
810 OPER FUND 1.084.28
814 CAP FAC FUND 118,637.05
83 8 11 OPER FUND 2.500.00
8687 OPER FUND 210.71
97814 OPER FUND 19.79
JT OPER FUND 804,252.06
CORP 405,563.40
SELF-FUNDED INSURANCE FUND 78.628.43
JT DIST WORKING CAPITAL 210,240.65
1,769,9/7.87
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 511MS PAGE 1
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAI0051/7/95 POSTING DATE 05117/95
WARRANT NO. VENDOR AMOUNT DESCRIPTION
1M652 AG TECH COMPANY $33.357.67 RESIDUALS REMOVAL M.O.10-9-91
1M853 ATM AA,INC. $1,680.00 LAB SERVICES
1M6M AT&T-UNIPLAN SERVICE $2,558.66 LONG DISTANCE TELEPHONE SERVICES
1M655 ATB T-MEGACOM SERVICE $967.80 LONG DISTANCE TELEPHONE SERVICES
144656 AT&T-FAXIMODEM SERVICE $22,89 LONG DISTANCE TELEPHONE SERVICES
1M657 AIR PRODUCTS&CHEMICALS $36.074,40 O&M AGREEMENT OXY GEN.SYST.M.O.&9-89
1446M AMERICAN PROTECTIVE SER.,INC. $1.007.29 SECURITY SUPPLIES
1M659 AMERICAN SIGMA $1,528.10 SAMPLER PARTS
144660 ANGEL SCIENTIFIC PRODUCTS,INC. $620,17 LAB SUPPLIES
144661 APPLIED SIOSYSTEMS,INC. $675.02 LAB SERVICES
144662 ABC LABORATORIES $470.00 LAB SERVICES
1"663 ASBURY ENVIRONMENTAL SERV. $35.00 WASTE OIL REMOVAL
1M664 AUTOMATIC DATA PROCESSING $5,31419 PAYROLL SERVICES
1M665 BFI MEDICAL WASTE SYSTEMS $8.00 WASTE DISPOSAL
1M666 BKK LANDFILL $2.630.16 RESIDUALS REMOVAL M.O.I0.Ml
1M667 BRW SAFETY&SUPPLY $636,38 SAFETY SUPPLIES
1"668 HAUER COMPRESSOR $66,71 COMPRESSOR PARTS
144869 BAXTER DIAGNOSTICS,INC. $427.35 LAB SUPPLIES
144670 BEACON BAY ENTERPRISES,INC. $252.15 TRUCK WASH TICKETS
144671 BERENDSEN FLUID POWER $444.99 ENGINE PARTS
144672 BETA TECHNOLOGY,INC. $26.69 INSTRUMENT PARTS
144673 810 VENTURES,INC. $237.00 LAB SUPPLIES
1M674 BOOT BARN $101.73 REIMBURSABLE SAFETY SHOES
1"675 BORLAND INTERNATIONAL $354.64 COMPUTER SOFTWARE
1M676 BOYLE ENGINEERING CORP. $36,291.61 ENGINEERING SERVICES 7-7-18 P141
1M6T7 BRONSON.BRONSON&MCKINNON $40.W3.08 LEGAL SERVICES-COUNTY BANKRUPTCY M.O.12-8.94
1M67B BUDGET JANITORIAL $4.320.00 JANITORIAL SERVICES
1M6/9 BURLINGTON SAFETY LAB,INC. $175.50 INSTRUMENT PARTS
144680 TOM BYER ROOFING SERVICE,INC. $1,58B.00 BUILDING REPAIRS
144681 CEPA $1,030.50 LAB SUPPLIES
144682 CS COMPANY $4,714.33 PLUMBING SUPPLIES
IM6B3 CALTROL,INC. $1.914.85 INSTRUMENT PARTS
IM6B4 CALIFORNIA AUTOMATIC GATE $6D0.42 SERVICE AGREEMENT
1M605 CASHCO,INC. $73.63 PLUMBING SUPPLIES
W686 CERFNET $45.31 COMPUTER SERVICES
1M687 COMPRESSOR COMPONENTS OF CA $274.76 VALVE PARTS
144688 CONNEL GM PARTS/DIV. MB.04 TRUCK PARTS
144689 CONVERSE CONSULTANTS O C $822.45 CONSULTING SERVICES M.O.B.11-93
14M90 COOPER CAMERON CORP. $634.77 COMPRESSOR PARTS
144691 COSTA MESA AUTO SUPPLY $243.39 TRUCK PARTS
1M692 COUNTERPART ENTERPRISES $647.48 COMPRESSOR PARTS
1M693 COUNTY CLERK $38.00 JOB NO.7.24 EXEMPTION FEE
1M694 COUNTY CLERK $36.00 ANNEXATION FILING FEE
1"695 COUNTY WHOLESALE ELECTRIC $3.371.16 ELECTRIC PARTS
1M696 STATE OF CALIFORNIA $8,841.00 STATE UNEMPLOYMENT INSURANCE
1M697 DE GULLE&SONS GLASS CO. $1,171.84 GLASS
FUNDNO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE 5012/95 PAGE2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05117/95 POSTING DATE O5117/95
WARRANT NO. VENDOR AMOUNT
144696 DELL MARKETING L.P. $2,972.95 OFFICE EQUIPMENT
144699 DEZURICK AND/OR CS CO. $1.044.44 VALVES
1M700 LABCLEAR $68.13 LAB SUPPLIES
144701 DICKSONS $1,627.44 AIR CONDITIONER
144702 DIGITAL EQUIPMENT CORP. 52,555.37 COMPUTER SOFTWARE
144703 DUNN EDWARDS CORP. $235.97 PAINT SUPPLIES
144704 D'VALS SALES $51.90 FITTINGS
144705 EASTMAN,INC. $429AS OFFICE SUPPLIES
IM706 ECOANALYSIS,INC. $1,320.00 CONSULTING SERVICES
1M707 ELCOM HARDWARE $312.70 ENGINE PARTS
1M708 JIM ELO $377.19 LIABILITY CLAIM JCSD-95-1--7
144709 EMERGENCY MGMT NETWORK 53,815.D0 SAFETY SUPPLIES
1"710 ENCHANTER,INC. $3.360.00 OCEAN MONITORING M.O.6I M2
1M711 ENVIRONMENTAL RESOURCE ASSOC. $750.50 LAB SERVICES
1M712 EXIDE ELECTRONICS $742.65 INSTRUMENT PARTS
144713 FALCON DISPOSAL SERVICE $9,220.00 RESIDUALS REMOVAL M.O.10-9.91
144714 FILTERLINE CORP. $155.03 FILTERS
1M715 FISCHER B PORTER CO. $3M.75 INSTRUMENT PARTS
1M716 FISHER SCIENTIFIC CO. $1,273.0 LAB SUPPLIES
144717 CLIFFORD A.FORKERT $2.718.0 SURVEYING SERVICES M.O.6894
1M718 CITY OF FOUNTAIN VALLEY $1,865.00 HAZARDOUS MATERIALS DISCLAIMER
1"719 GST,INC. $11,473.55 OFFICE EQUIPMENT
1M720 GANAHL LUMBER CO. $96.49 LUMBERAIARDWARE
144721 GATES FIBERGLASS INSTALLERS $955.50 FIBERGLASS REPAIRS
1M722 GENERAL TELEPHONE CO. $996.98 TELEPHONE SERVICES
144723 GIERLICH-MITCHELL,INC. $1,092.59 PUMP PARTS
144724 GLOBAL NETWORK/JOHN NAISBTTTS $195.00 SUBSCRIPTION
1M725 GRAPHIC DISTRIBUTORS 54,4M.49 PHOTOGRAPHIC SUPPLIES
144726 GRASSY S.T.I. 53,370.34 ENGINE PARTS
1M727 DGA CONSULTANTS 51,460.00 SURVEYING SERVICES M.O.6894
1M728 DAVID R.GRIFFIN $27.071.65 LEGAL SERVICES-TECHITE PIPE M.O.9I1 94
1M729 HB TYPE B GRAPHICS $10.78 PRINTING
1M730 HACH COMPANY $1,249.36 LAB SUPPLIES
1M731 HARRINGTON INDUSTRIAL PLASTIC $421.46 PLUMBING SUPPLIES
1M732 HATCH 8 KIRK,INC. $2.041.93 ENGINE PARTS
1M733 HAUTAWAY CONTAINERS 5550.00 CONTAINER RENTALS
1"734 HERTZ CLAIM MANAGEMENT $2,063.33 WORKERS COMP CLAIMS ADMIN.
1M735 HOLMES 8 NARVER,INC. $66.959.77 ENGINEERING SERVICES 2-14R-2
1M738 HOME DEPOT 5229.70 HARDWARE
IU737 RS HUGHES CO,INC. $122-56 PAINT SUPPLIES
1M738 CITY OF HUNTINGTON BEACH $14.330.25 WATER USE
1M739 HUNTS FINAL PHASE $1.350.00 CONSTRUCTION SERVICES
W740 IPCO SAFETY $2.045.63 SAFETY SUPPLIES
1M741 IMPERIALWEST CHEMICAL $50,215D8 FERRIC CHLORIDE M.0.11-18.92
1M742 INDUSTRIAL FILTER MFG. 52,922.90 FILTER
C1"743 INDUSTRIAL POWER SYSTEMS � $171.00 INSTRUMENT PARTS � e
FUND NO 9199 - IT DIST WORKING CAPITAL PROCESSINGDATE 5/12M5 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID ON17M5 POSTING DATE O5117M5
WARRANT NO. VENDOR AMOUNT
144744 INDUSTRIAL THREADED PRODUCTS $895.15 CONNECTORS
144745 INTERMOUNTAIN SCIENTIFIC CORP. $662.49 LAB SUPPLIES
144746 INTERSTATE BATTERY SYSTEMS $658.68 BATTERIES
144747 IRVINE PHOTO GRAPHICS $88.36 PHOTOGRAPHIC SERVICES
144748 IRVINE RANCH WATER DISTRICT $30.59 WATER USE
144749 JAMISON ENGINEERING $27,607.23 CONSTRUCTION SERVICES
144750 GREAT WESTERN SANITARY SUPPLY. $234.38 JANITORIAL SUPPLIES
144751 JENSEN INSTRUMENTS CO. $1.997.16 GAUGE
144752 JOHNSTONE SUPPLY $1,186.13 ELECTRIC PARTS
144753 KARS'ADVANCED MATERIALS,INC. $2.497.00 MACHINETESTING
144754 KING BEARING,INC. $3.718.29 MACHINE SUPPLIES
144765 KNOX INDUSTRIAL SUPPLIES $3.623.52 TOOLS
144756 L A CELLULAR TELEPHONE CO. $597.55 CONNECTION FEE REFUND
144757 LAIDLAW ENVIRONMENTAL SERVICES $429.00 WASTE DISPOSAL DRUMS
144758 DAVID D.L'ANGELLE.PH.D. $4.358.00 TRAINING SYSTEMS IMPLEMENTATION GUIDE
144759 LAW OFFICES OF ROBERT L.LAVOIE $527.40 LEGAL SERVICES-NITZEN
144760 LEE&RO CONSULTING ENGR. $30.498.93 ENGINEERING SERVICES PI-40.1&2
144761 CHARLES P.CROWLEY CO. $754.38 INSTRUMENT SUPPLIES
144762 LEHMAN BROTHERS.INC. $246.58 REMARKETING AGREEMENT
144763 LEWCO ELECTRIC $592.53 TRUCK PARTS
1"764 LOCALAGENCY $500.00 ANNEXATION FEES
1"765 MAGNETROL $458.25 ENGINE PARTS
1"766 MARGATE CONSTRUCTION,INC. $327.729.00 CONSTRUCTION P242-2
W767 MAVERICK,INC. $5,340.00 CRANE INSPECTION
144760 MCKENNA ENGR.&EQUIP. $5.829.63 PUMP PARTS
144769 MEDLIN CONTROLS CO. 5504.68 INSTRUMENT SUPPLIES
1"770 MICROBIAL INSIGHTS.INC. &800.00 CONSULTING SERVICES M.O.11-I6-92
1"771 MICROBICS CORPORATION $1.404.97 CHEMICALS
144772 MIDWAY MFG.&MACHINING $1.725.00 MECHANICAL REPAIRS
144773 MILLTRONICS $1.930.03 INSTRUMENT PARTS
144774 MISSION INDUSTRIES $3.961.14 UNIFORM RENTALS
1"775 MORELAND&ASSOCIATES $404.25 FINANCIAL AUDIT SERVICES
1N776 MOTION INDUSTRIES,INC. $270.06 FITTINGS
144777 NATIONAL SAFETY COUNCIL $311.01 SAFETY FILM RENTALS
144770 NEAL SUPPLY CO. $1,823.72 MECHANICAL PARTS
144779 NEUTRON $3,455.42 ANIONIC POLYMER M.O.&1&94
144700 NEOTRONICS 5215.30 INSTRUMENT PARTS
144781 CITY OF NEWPORT BEACH &56.92 WATER USE
144782 NORTHWESTERN NATIONAL $91684.10 DISABILITY INSURANCE
144783 OI CORPORATION $314.79 LAB SUPPLIES
144784 ORANGE COUNTY AUTO PARTS CO. $142.73 TRUCK PARTS
144785 ORANGE COUNTY BUSINESS JOURNAL $79.00 SUBSCRIPTION
144765 ORANGE COUNTY CHEMICAL CO. $2.15257 CHEMICALS
144787 ORANGE COUNTY WHOLESALE S4,314S3 ELECTRICAL SUPPLIES
1"788 ORANGE COURIER $51l.50 COURIER SERVICES
1"789 ORANGE VALVE&FITTING CO $1.473.56 FITTINGS
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE 5112195 PAGE4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID O6117195 POSTING DATE 05/17M5
WARRANT NO. VENDOR AMOUNT
144790 PARASITOLOGY RESEARCH LABS $125.00 LAB SUPPLIES
144791 PSSI $1,500.00 SEWER VIDEO INSPECTION
144792 PACIFIC MECHANICAL SUPPLY $94.94 PLUMBING SUPPLIES
144793 PACIFIC PARTS $8,225.99 OFFICE EQUIPMENT
144794 PACIFIC BELL $136.78 TELEPHONE SERVICES
144795 PADRE JANITORIAL SUPPLY $484.88 JANITORIAL SUPPLIES
144796 PALMIERI,TYLER,WIENER, $980A0 LEGAL SERVICES M.O.6-12-91
144797 PARKHOUSE TIRE CO. $360.96 TIRES
144798 PASCAL AND LUDWIG $13,023.00 CONSTRUCTION P243
144799 PASCAL&LUDWIG $6,376.50 CONSTRUCTION P142
144800 COUNTY SANITATION DISTRICTS $5,581.47 REIMS.PETTY CASH,TRAINING&TRAVEL
144801 PIERCE CHEMICAL COMPANY $162.00 LAB SUPPLIES
144802 PIMA ORO SYSTEMS,INC. $106,026.01 RESIDUALS REMOVAL M.O.541-91
144803 PIONEER STANDARD ELECTRONICS 543,ISS28 OFFICE EQUIPMENT
144804 PLAN HOLD CORP. $515.57 OFFICE FURNITURE
144905 POLYMETRICS,INC. $1,262.75 LAS SUPPLIES
144806 POLYPURE,INC. $15.947.33 CATIONIC POLYMER M.O.3-11-92
144807 POWER SYSTEMS $701.36 ENGINEERING PARTS
144808 HAROLD PRIMROSE ICE $175.00 ICE
144809 PROFESSIONAL SERVICE IND. $368.00 SOIL TESTING
144810 PRYOR REPORT $79.00 TRAINING REGISTRATION
144811 RJN COMPUTER SERVICES,INC. $7.723.76 COMPUTER SERVICES
144812 RPM ELECTRIC MOTORS $3,033AS ELECTRIC MOTOR PARTS
144813 RAINBOW DISPOSAL CO. $1,715.43 TRASH REMOVAL
144814 THE REGISTER $652.00 NOTICES&AOS
144815 REMEDYTEMP $3,594.40 TEMPORARY PERSONNEL
144816 ROYCE PRODUCTIONS $323.25 PUBLICATIONS
144817 SANTA FIE INDUSTRIAL PLASTICS $526.12 PLUMBING SUPPLIES
144818 SARTORIUS CORP. $482.39 INSTRUMENT REPAIRS
1"819 DOUG SARVIS $1,125.00 CPR/FIRST AID TRAINING
W820 SCHWING AMERICA $3,234.51 PUMP PARTS
W921 CITY OF SEAL BEACH $450.00 ENGINEERING INSPECTION-3-36
144822 SHURELUCK SALES 54,304.88 TOOLSAIARDWARE
144523 SKYPARK WALK-IN MEDICAL CLINIC $554.00 PRE-EMPLOYMENT PHYSICAL EXAMS
144824 SOCCASTAIROUALITY $4.149.25 PERMITFEES
1"825 SOUTH COAST AIR QUALITY $12,810.00 CLEAN AIR ACT FEE
1"826 SO CALIF.COSTAL WATER 5299.740.00 ANNUAL SCCWRPA FEES M.O.2-9.94
1"827 SO CALIF.EDISON CO. $62.675.48 POWER
W826 SO.CAL.GAS.CO. $9,347.07 NATURAL GAS
144829 SO.CALIF.WATER CO. $T7.52 WATER USE
144830 SOUTHERN COUNTIES OIL CO. $10.573.03 DIESEWNLEADED FUEL
144831 SOUVENIR PHOTO $107.44 PHOTOGRAPHIC SERVICES
144832 SPARKLETTS DRINKING WATER $74.25 DRINKING WATER/COOLER RENTALS
1"833 SPECIAL PLASTICS SYSTEMS,INC. $2,638.84 MECHANICAL PARTS
144834 STATE BOARD OF EQUALIZATION $200.00 ANNEXATION FEE
C144835 STATE BOARD OF EQUALZATION $100,01 ANNEXATION FEE `
C
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE W12195 PAGE 5
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID O5117195 POSTING DATE 05/17/95
WARRANT NO. VENDOR AMOUNT
1"836 SUNCLIPSE,INC. $728.33 REFUND USER FEE OVERPAYMENT
1"W7 SUNSETFORD $517.90 TRUCK PARTS
144838 SUPELCO,INC. $134.60 LAB SUPPLIES
1"839 SUPER CHEM CORP. 5414.62 JANITORIAL SUPPLIES
144840 TAYLOR-DUNN MFG.COMPANY $1,112.52 ELECTRIC CART PARTS
144MI TEKTRONIX.INC. $305.55 OFFICE EQUIPMENT
144842 THOMPSON INDUSTRIAL SUPPLY $987.0 MECHANICAL PARTS
144843 TOKIO MARINE 8 FIRE $95CM LIABILITY CLAIM 3-CSD-ML-6
144844 TONY'S LOCK 8 SAFE SERVICE $103.09 LOCKS 8 KEYS
144545 TRAVEL EXECUTIVES $1.667.19 TRAVEL SERVICES M.O.6-&94
144646 TRUCK 8 AUTO SUPPLY,INC. $981.00 TRUCK PARTS
144847 TRUESDAIL LABS $1,749.56 LAB SERVICES
144848 JG TUCKER 8 SON,INC. $283.35 INSTRUMENT PARTS
144849 ULTRA SCIENTIFIC $597.00 LAB SUPPLIES
144850 UNITED PARCEL SERVICE $116.24 PARCEL SERVICES
1"851 DATAVAULTIUS SAFE DEPOSIT CO. 5238.00 DATA STORAGE
141852 VALIN CORPORATION $450.35 MECHANICAL PARTS
144853 VALLEY CRIES SUPPLY CO. $318.51 PLUMBING SUPPLIES
144854 VORTEX INDUSTRIES $849.00 BUILDING REPAIRS
144855 WATERS CORPORATION $37.33 LAB SUPPLIES
144856 WECO INDUSTRIES,INC. $7,067.64 MECHANICAL PARTS
144857 WGRA WORKSHOPS $345.00 WORKSHOP REGISTRATION
144858 WESTERN STATES CHEMICAL SUPPLY $37,735.71 CAUSTIC SODA B HYPOCHLORIDE M.O.8-12-9284-07-94
1"859 WEST-LITE SUPPLY CO. $192A4 ELECTRIC SUPPLIES
144860 WNEG $716.47 LAB SUPPLIES
144B61 XEROX CORP. $9,922.22 COPIER LEASES
144862 ZYMARK CORP. $265.48 LAB SUPPLIES
144663 DAVID R.GRIFFIN $75.000.00 LEGAL SERVICES-TECHITE PIPE M.O.9-14.94
$1.669.739.72
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE U12195 PAGER
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/17/95 POSTING DATE 05117195
SUMMARY AMOUNT
02 OPER FUND 2.891,13
02 CAP FAC FUND 66.959,77
03 OPER FUND 53,696A4
03 CAP FAC FUND 113.31&03
95 OPER FUND 6,429 09
07 OPER FUND 5,852.84
07 CAP FAC FUND 11,492.69
011 OPER FUND 4,796.82
011 CAP FAC FUND 388.00
014 CAP FAC FUND 2,180.00
05&8 OPER FUND 2,637.84
06&7 OPER FUND 3,161.28
07&14 OPER FUND 6,221.73
JT OPER FUND "9,899.42
CORP 471,447.11
SELF-FUNDED INSURANCE FUND 4,042.26
JT DIST WORKING CAPITAL 464,347.47
1,689,739.72
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (10)(a): Consideration of motion authorizing staff to issue a
purchase order to Pioneer-Standard Electronics, Inc., in
a total amount of$36,342.72, plus sales tax, for the
Purchase of Eight Celebris 590 Desktop Computers (Specification No. E-255), in
accordance with the terms and conditions of the California Multiple Awards Schedule
Program of the State of California and State of California Contract No. 3-94-70-0037A.
Summary
Staff is requesting authorization to purchase eight new desktop computers included in the capital
equipment budget for fiscal 1994-95, to be used in Division 3720 of the Engineering Department. The
desktop computers will be Celebris 590 Desktop Computers manufactured by Digital Equipment
Corporation (DEC) and feature 90-MHz Pentium CPU.
The computers will be used for AutoCAD software and other related third-party software packages.
This software is used by the Engineering staff to do design drawings by computer. The work being
done in Division 3720 requires more calculations and larger drawings. This combined with the
demands of the new software versions require faster machines.
The previous computer systems were purchased over the past several years and have resulted in a
variety of manufacturers and configurations. The result has been a lack of uniformity, making it difficult
to provide consistent support for the Division 3720 staff. This purchase will help standardize the
computer hardware platform for Division 3720.
The computer hardware being replaced will be retained with the Engineering Department to provide
desktop computing for staff who have previously been required to share computers or to upgrade the
existing computers of clerical staff whose computers have also suffered from having to use software
which demands a more robust computer platform.
The Districts will purchase the desktop computers under the Digital Equipment Corporation Contract
No. 3-94-70-0037A with the State of California's California Multiple Award Schedule (CMAS). The State
of California charges local government agencies 1.5% of the purchase price before taxes for the
privilege of utilizing the State's WAS contract. The total cost for the computers listed above, including
the contract fee, is $36,342.72, plus sales tax.
Staff Recommendation
Staff recommends award of a purchase order to Pioneer-Standard Electronics, Inc., for the Purchase of
Eight Celebris 590 Desktop Computers made by Digital Equipment Corporation (DEC) (Specification
No. E-255), in the amount of$36,342.72, plus sales tax.
osian
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
DISTRICTS 6, 7 & 14
Agenda Item (10)(b): Proposed Change Order No. 1 to the Plans and
Specifications Baker-Gisler Interceptor,from
Fairview Road to Plant No. 1, Contract No. 14-1-1A.
Summary
This$8.27 million project, located within the City of Costa Mesa between Fairview Road at
Baker Street and the Santa Ana River,was designed by Boyle Engineering Corporation and
provides for the construction of a 90-inch reinforced concrete pipe(RCP) sewer, approximately
10,500 feet long and 760 feet of 6'x 8'reinforced concrete box sewer through Mesa Verde
Country Club (MVCC).
Since the formation of County Sanitation District No. 14, Sanitation Districts Nos. 6, 7, and 14
have been working towards the completion of a joint conveyance system that will deliver
wastewater from the communities of Irvine, Costa Mesa, and Santa Ana to the Fountain Valley
Reclamation Plant No. 1. To date, four of the six construction contracts (from Bristol Street to
Fairview Road, Contract No. 14-1-1 B; Main Street to Bristol Street, Contract No. 14-1-2; and
two in the vicinity of the Santa Ana River, Contract Nos. 14.1-1A-1 and 14-1-lA-2) have been
completed.
The two remaining projects include this contract, Contact No. 14-1-IA which is scheduled to be
completed by June 1995 and a future District No.6 collector, Contract No.6-12 extending
southerly in Fairview Road from the Paularino Channel just south of Baker Street to Wilson
Street. Design for Contract No.6-12 is essentially complete, and is scheduled for construction
sometime in 1997. Change Order No. 1 is an addition of$33,676.16 to the contract for twelve
items of additional work and a two calendar day time extension. This contract was awarded on
February 2, 1994 to Mladen Buntich Construction Co., Inc.
Staff Recommendation to Joint Boards of Directors
Staff recommends approval of Change Order No. 1 for an addition of$33,676.16 to the contract
with Mladen Buntich Construction Co., Inc. There is a 2 calendar day time extension associated
with this change order.
U
rnsoocv ,m
-,° COUNTY SANITATION DISTRICTS
Y Bf ORANGE COUNTY. CALIFORNIA
ApH126, 1995 IOBAA ELLIS AVENUF
v U Box 9127
FOUNTAIN VALLEY.CALIFORNIA 9272E-81 27
71,09152.2411
STAFF REPORT
DISTRICTS 6. 7. and 14
Proposed Chance Order No. 1 to the Plans and Specifications
Baker-Gisler Interceptor. from Fairview Road to Plant No. 1,
Contract No. 14-1-1A.
Summary
This $8.27 million project, located within the City of Costa Mesa between Fairview Road at
Baker Street and the Santa Ana River, was designed by Boyle Engineering Corporation and
provides for the construction of a 90-inch reinforced concrete pipe (RCP) sewer, approximately
10,500 feet long and 760 feet of 6' x 8' reinforced concrete box sewer through Mesa Verde
Country Club (MVCC).
Since the formation of County Sanitation District No. 14, Sanitation Districts Nos. 6, 7, and 14
have been working towards the completion of a joint conveyance system that will deliver
wastewater from the communities of Irvine, Costa Mesa, and Santa Ana to the Fountain Valley
Reclamation Plant No. 1. To date, four of the six construction contracts (from Bristol Street to
Fairview Road, Contract No. 14-1-1B; Main Street to Bristol Street, Contract No. 14-1-2; and
two in the vicinity of the Santa Ana River, Contract Nos. 14-1-1A-1 and 14-1-1A-2) have been
completed,
The two remaining projects include this contract, Contact No. 14-1-IA which is scheduled to be
completed by June 1995 and a future District No. 6 collector, Contract No. 6-12 extending
southerly in Fairview Road from the Paularino Channel just south of Baker Street to Wilson
Street. Design for Contract No. 6-12 is essentially complete, and is scheduled for construction
sometime in 1997. Change Order No. 1 is an addition of$33,676.16 to the contract for twelve
items of additional work and a two calendar day time extension. This contract was awarded on
February 2, 1994 to Mladen Buntich Construction Co., Inc.
Item 1, in the amount of$1,531.00, is for repair of a water main that broke after the installation
of the Districts' 90-inch RCP line. This 6-inch asbestos concrete pipe (ACP) water line broke
outside the Districts' trench zone (after back fill operations) due to the pliable nature of the ACP
water main.
Item 2, in the amount of$1,420.00, is for the repair of damaged sprinkler lines that occurred
during trenching operations for the Districts' 90-inch RCP line. These lines undisclosed to the
design and consequently were not shown on the contract documents.
Item 3, in the amount of$1,599.61, is for the repair of a damaged Southern California Edison
(SCE) duct bank that occurred during excavation for a 101 vitrified-clay pipe (VCP). The
plotting of this utility was not accurately disclosed to the designer.
Item 4, in the amount of$1,533.65, is for the removal and replacement of a section of curb and f
gutter and splash pad that failed due to the poor condition of the subgrade adjacent to Districts'
trenching operations. This is considered a changed field condition.
Item 5, in the amount of$1,996.00, is for the extra tree removal required to build the reinforced
concrete box (RCB) structure through the Mesa Verde Country Club property. The contract
documents (including the Mesa Verde County Club Agreement)did not accurately consider the
number of trees required to be removed to build both the RCB structure and siphon facility. The
actual field construction conditions dictated the number of trees which had to be removed.
Item 6, in the amount of$5,087.75, is for the increase in length and thickness of a stem wall
constructed on top of the RCB structure through the Mesa Verde Country Club property. The
change to the wall was due to a grading plan change initiated by the Mesa Verde Country
Club's landscape architect. This wall is for security and safety.
Item 7, in the amount of$6,291.63 and one calendar day, is for the change in the orientation of
a 33-inch stub out from an existing manhole to conform to the design alignment. This change
order covers materials only for extra fittings and slurry mix for backfilling. This was a changed
condition.
Item 8, in the amount of$2,749.46 and one calendar day, is for the removal and replacement of
a section of failed curb and gutter along Deodar Avenue. This failure was caused by an
unstable subgrade in the vicinity of the pipe trench zone. This is considered a changed
condition.
Item 9, in the amount of$2,164.74, is for the use of a security guard at the gate entrance to
Plant No. 1 along Garfield Avenue during hauling operations. Construction staff was directed to
use a guard by the Safety and Health Department for security reasons. This was an ongoing
requirement throughout the entire hauling time frame for excavated materials that were stored in
the plant.
Item 10, in the amount of$4,588.49, is for additional site improvement costs incurred at the
Sanwa Bank property location. This was performed to satisfy or compromise with Magna
Enterprises' interpretation of the Districts' Easement Agreement with Sanwa Bank of California
for site restoration.
Item 11, in the amount of$4,269.76, is for the removal and replacement of a catch basin that
encroached on the Districts'78-inch RCP trench zone. Design drawings did not state it was to
be protected in place or removed and replaced. It was assumed that there was enough
clearance between the new pipe and the existing catch basin. The actual field conditions
dictated the removal and replacement of the catch basin.
Item 12, in the amount of$444.07, is for the modification to a 33-inch VCP stub out from a
junction structure and the lowering of the pipe profile extending from the structure. Design
changes in the invert elevations of adjacent collection system lines called for the lowering of the
invert elevation for the subject 33-inch stub out.
The changes described above would have been included in the original design if discovered or
known in the design phase.
The original contract amount for this project was $8,278,983.00. The project is now
`,- approximately 75% complete. The net amount of change orders to date is $33,676.16,
representing a net increase of 0.4% above the original contract amount.
Staff Recommendation
Staff recommends approval of Change Order No. 1 for an addition of$33,676.16 to the contract
with Mladen Buntich Construction Co., Inc. There is a 2 calendar day time extension associated
with this change order.
ENGIMGRRPTSl R04 .9
gad
Page 1 of 7 y
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127 �✓
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Mladen Buntich Construction Co.. Inc C.O. No.: One (1)
Date: April 26, 1995
Job: Baker-Gisler Interceptor, from Fairview Road to Plant No. 1. Contract No. 14-1-1A
Consultant: Boyle Enaineerina Corporation
Amount of this Change Order(Add)(Deduet) $33. 776.16
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation therefor,the following additions to or
deductions from the contract price are hereby approved.
ITEM 1 -REPAIR OF WATER MAIN BREAK
The Contractor was directed to repair a 6inch water line that broke outside the trench zone during the
construction of the Districts'90-Inch reinforced concrete pipe(RCP)sewer line at Station No.46+80. The contract
required the Contractor to remove and dispose of the old 6-Inch asbestos concrete pipe(ACP)water line over the
sewer excavation and replace it with a Class 200 polyvinyl chloride(PVC) pipe prior to the construction of the 90-
inch RCP pipe. The water line was to be installed a minimum of five feet beyond each side of the sewer trench.
After the back fill and compaction of the sewer line trench,the water line broke seven feet outside the trench zone
(approximately four feet from the flexible coupling). The friable nature of the ACP pipe was the major reason for
the break. The repair required the Contract to re-excavate the water line,Install a new 4-foot section of PVC pipe,
back fill,and compact This item of work was accomplished by Contractor's force account pursuant to Section
10-6(B)2(b)of the General Provisions. (Reference FCO#4)
ADDED COST THIS CHANGE ORDER ITEM: $1,531.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2-REPAIR OF SPRINKLER LINES
The Contractor damaged three PVC Irrigation lines while trenching for the 90Jnch RCP line at the entrance to the
Sanwa Bank property on Nutmeg Place;these lines were undisclosed to the designer and consequently not
shown on the contract drawings. The Contractor was directed to repair one 3/4-Inch, one 1-124nch,and one
24nch sprinkler lines,set two sprinkler wire pull boxes for control wires,and replace 40 feet of wire. This Rem of
work was accomplished by Contractor's force account pursuant to Section 10-6(B)2(b) of the General Provisions.
(Reference FCO#3)
ADDED COST THIS CHANGE ORDER ITEM: $1,420.00
TIME EXTENSION THIS CHANGE ORDER REM: 0 Calendar Days
e
Page 2 of 7
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Mladen Buntich Construction Co Inc C.O. No.: One (1)
Date: April 26. 1995
Job: Baker-Gisler Interceptor. from Fairview Road to Plant No 1. Contract No. 14-1-1A
Consultant: Boyle Engineering Corporation
ITEM 3-REPAIR OF SOUTHERN CALIFORNIA EDISON (SCE) LINE
The Contractor damaged an SCE 2"x 4"direct burial line at Station No.91+31 during the excavation for a
10-inch vitrified clay pipe(VCP)sewer line to be installed. This utility was not accurately shown in the plan view
of the contract drawings(actual location was seven feet from what was shown on the contract drawings). In
addition,this line was not field marked by Underground Service Alert, therefore,it could not be potholed by the
Contractor. The Contractor was directed to rebuild the duct encasement. The Contractor had to stop main line
trenching while SCE crews repaired service. The Contractor assisted SCE crews by excavating around service
to initiate repairs. This item of work was accomplished by Contractor's force account pursuant to Section
10-6(8)2(b)of the General Provisions. (Reference FCO#2)
ADDED COST THIS CHANGE ORDER ITEM: $1,599.61
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4-REMOVAL AND REPLACEMENT OF CURB,GUTTER,AND SPLASH PAD
The Contractor was directed to remove and replace a damaged cross gutter and splash pad at the south
entrance to the Sanwa Bank property site(Nutmeg Place and Deodar Avenue),Station No. 102+24. The failure
of the curb and gutter was attributed to the poor condition of the subgrade and the proximity to the receiving pit
used during direct jacking operations. This is considered a changed condition. The splash pad that was located
just outside the trench cut for the 90inch RCP line also failed due to poor subgrade conditions. This item of
work was accomplished by Contractor's force account pursuant to Section 10-6(B)2(b)of the General Provisions.
(Reference FCO#11)
ADDED COST THIS CHANGE ORDER ITEM: $1,533.65
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 5-ADDITIONAL TREE REMOVAL IN AND ADJACENT TO MESA VERDE COUNTRY CLUB
The Contractor was directed to remove an extra 22 trees which were required to accommodate the construction
of the reinforced concrete box structure and access ramp inside the Mesa Verde Country Club(MVCC)property
and the siphon being built on Gisler Avenue adjacent to the MVCC Golf Course. Approximately seven extra
trees(Leylandi Cypress)had to be removed to allow for the construction of the access ramp connecting to the
siphon inlet structure. These trees were not included in the agreement with the MVCC. In addition,ten extra
trees had to be removed adjacent to the siphon being constructed (just outside MVCC property)to allow room for
shoring, and the same for five additional trees adjacent to the entrance at the sixth hole location. Limits of tree
removal as depicted on the contract documents did not allow for the above additions. The actual field change
conditions dictated the tree removal. This item of work was accomplished by Contractor's force account
pursuant to Section 10-6(B)2(b) of the General Provisions. (Reference FCO#13)
ADDED COST THIS CHANGE ORDER ITEM: $1,996.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
n
Page 3 of 7
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor Mladen Buntich Construction Co.. Inc C.O. No.: One (1)
Date: Apol26. 1995
Job: Baker-Gisler Interceptor, from Fairview Road to Plant No. 1. Contract No. 14-1-1A
Consultant: Boyle Engineering Corporation
ITEM 6-INCREASE LENGTH AND THICKNESS OF STEM WALL
The Contractor was directed to increase the length of the 1'6"high stem wall located on the deck of the 6'x 8'
reinforced concrete box(RCB)structure at the Mesa Verde Country Club. The extension was for approximately
72 feet and was required due to modifications in the grading plans by MVCC's landscape architect. This wall
was designed for both security and public safety reasons(3-12-toot high chain link fence placed on top of stem
wall)and was to be constructed when the deck of the RCB structure was above grade (street side of the golf
course). In addition,the Contractor was directed to increase the thickness of the stem wall from approximately
8 inches to 10 Inches to match the width of the main box wall. This detail showed the reinforcing for the main
wall extending straight up through the stem wall. If the stem wall had been left at an 8-inch width,there would
have been only 14nch of cover on the reinforcing steel (not recommended by Standard Specifications). As a
result of the increase in thickness in the stem wall,the method of construction had to be modified from using
snap-ties to forming with taper ties. This Rem was accomplished on a negotiated basis pursuant to General
Provisions Section 10-6(B)(2)(a). (Reference PCH#2)
ADDED COST THIS CHANGE ORDER ITEM: $5,087.75
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 7 -MODIFICATION OF 33-INCH STUB OUT ALIGNMENT
The Contractor was directed to correct an existing manhole stub out orientation problem at Station No.0+60.
The design plans called for a new 33-inch VCP line(25 feet)to join an existing manhole to a new 72-inch
manhole with a given orientation. After excavating for the existing manhole,R was determined that the
orientation of the stub out was oft enough to prevent the Contractor from achieving the design alignment. To
resolve the problem,the Contractor used one 33-inch 1/16 bend VCP idling,two 33-inch 3-degree bend VCP
fitting,and one 33"x 2'shon VCP idling to obtain the design alignment. In addition,the Contractor used a
1-sack and 3-sack slurry mix to secure the fittings during the backfiR of the trench. This Rem of work was
accomplished by Contractor's force account pursuant to Section 10-6(B)2(b) of the General Provisions.
(Reference FCO#9)
ADDED COST THIS CHANGE ORDER ITEM: $6,291.63
TIME EXTENSION THIS CHANGE ORDER ITEM: 1 Calendar Days
ITEM 8-REMOVAL AND REPLACEMENT OF CURB AND GUTTER
The Contractor was directed to remove and replace approximately 150 feet of failed curb and gutter along
Deodar Avenue(east side)between Baker Street and Nutmeg Place. The failure was caused by an unstable
subgrade outside the trench zone and the movement of heavy cranes required for 904nch RCP pipe laying
operations. This contributed to the bulging of the adjacent curb and gutter sections. This is considered a
changed condition. This Rem of work was accomplished by Contractor's force account pursuant to Section
10-6(B)2(b)of the General Provisions. (Reference FCO#12)
ADDED COST THIS CHANGE ORDER ITEM: $2,749.46
TIME EXTENSION THIS CHANGE ORDER ITEM: 1 Calendar Days
M
Page 4 of 7
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Mladen Buntich Construction Co.. Inc C.O. No.: One (1)
Date: Apr126. 1995
Job: Baker-Gisler Interceptor, from Fairview Road to Plant No 1 Contract No. 14-1-1A
Consultant: Boyle Enoineerino Cc oration
ITEM 9-USE OF SECURITY GUARD AT PLANT NO. 1 SOUTH ENTRANCE
The Contractor was directed to provide a security guard at the gate entrance along Garfield Avenue (southeast
comer) on an as needed basis during dirt hauling operations. Per contract documents,the Contractor was
allocated a three-acre site on Districts'Reclamation Plant No. 1 property for storage and blending. Staff was
directed by the Safety and Health Department to provide the guard for obvious security reasons. This is an
ongoing operation until all excavation is completed. This item of work was accomplished by Contractor's force
account pursuant to Section 1 M(B)2(b)of the General Provisions. (Reference FCO#6)
ADDED COST THIS CHANGE ORDER ITEM: $2,164.74
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
REM 10-ADDITIONAL RESTORATION COSTS-SAN WA BANK PROPERTY
The Contractor was directed to make additional site improvements at the north end of the Sanwa Bank property
to satisfy Magna Enterprises'Interpretation of the Districts'easement agreement with Sanwa Bank California.
Districts'staff considers this extra work over and above the requirements stipulated in the agreements, but was
performed for the sake of compromise. The scope of the additional work included the following: remove and
replace curb returns, remove asphalt pavement,landscape the area (matching surrounding landscape),and
install two 44nch drain lines. This Rem of work was accomplished by Contractor's force account pursuant to
Section 10-6(B)2(b) of the General Provisions. (Reference FCO#5)
ADDED COST THIS CHANGE ORDER ITEM: $4,588.49
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 11 -REMOVAL AND REPLACEMENT OF CATCH BASIN
The Contractor encountered a 7-foot catch basin that conflicted with the alignment of a new 784nch RCP line to
be installed at Station No.82+88. The contract documents did not call for the catch basin to be either removed
and replaced,or protected in place. The catch basin was supported by a substructure that was very sandy and
would have been very difficult to support in place. Therefore,the Contractor was directed to remove the catch
basin at the edge of the trench prism and reinstall after the 78inch RCP line was constructed along with the
relocation of a 24-inch storm drain line. This Rem of work was accomplished by Contractors force account
pursuant to Section 10b(B)2(b)of the General Provisions. (Reference FCO#10)
ADDED COST THIS CHANGE ORDER ITEM: $4,269.76
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 5 of 7 V
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127 �.✓
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Mladen Buntich Construction Co.. Inc C.O. No.: One (1)
Date: April 26. 1995
Job: Baker-Gisler Interceptor, from Fairview Road to Plant No. 1. Contract No. 14-1-1A
Consultant: Boyle Engineering Corporation
ITEM 12-MODIFICATIONS TO THE JUNCTION STRUCTURE AT STATION NO. 120+14
The Contractor was directed to lower the 334nch stub and 334nch VCP line extending northerly from the junction
structure at College Avenue (Station No. 120+14). The design invert elevation of the 334nch stub was lowered
approximately 1.5 feet. Design surveys performed to support the design for the abandonment of the Airbase
Trunk Sewer revealed that actual invert elevations of some existing sewers along Watson Avenue were
significantly lower than recorded information indicated. Therefore,the 334nch inlet was lowered at the junction
structure to allow the future Bows from the sewers in Watson Avenue to be intercepted. Most of the extra costs
incurred were for the increased excavation to lower the 33inch VCP profile extending approximately 80 feet from
the structure(25 cubic yards). This Rem of work was accomplished by Contractors force account pursuant to
Section 10-6(B)2(b)of the General Provisions. (Reference FCO#1)
ADDED COST THIS CHANGE ORDER ITEM: $444.07
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days.J
TOTAL ADDED COSTS THIS CHANGE ORDER: $33,676.16
TOTAL TIME EXTENSION THIS CHANGE ORDER: 2 Calendar Days
S
' Page 6 of 7
`..� COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Mladen Suntich Construction Co.. Inc C.O. No.: One (1)
Date: April 26, 1995
Job: Baker-Gisler Interceptor, from Fairview Road to Plant No 1 Contract No. 14-1-IA
Consultant: Boyle Engineering Corporation
The additional work contained within this Change Order can be performed incidental to the prime work and within
the time allotted for the original Contract and any extensions to the Contract time made by this and all previously
issued Change Orders. It is therefore mutually agreed that 2 day extension of time to perform the work is
required for this Change Order,but that no direct or indirect,incidental or consequential costs, expenses, losses
or damages have been or will be incurred by Contractor,except as expressly granted and approve by this
Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: February 2, 1994
Original Contract Time: 480 Calendar Days
Original Completion Date: May 27, 1995
Time Extension this C.O.: 2 Calendar Day
Total Contract Time Extension: 2 Calendar Day
Revised Contract rime: 482 Calendar Days
Revised Final Completion Due Date: May 29, 1995
Time Subject to Liquidated Damages: Not Applicable
Actual Final Completion Date: Not Applicable
Original Contract Price $ 8,278,983.00
Prev.Authorized Changes $ 0,00
This Change (Add) (Bedust) $ 33,676.16
Amended Contract Price $ 8,312,659.16
4f
Page 7 of 7
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY �..f
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor Mladen Buntich Construction Co.. Inc C.O. No.: One (1)
Dale: April 26, 1995
Job: Baker-Gisler Interceptor, from Fairview Road to Plant No. 1 Contract No. 14-1-1A
Consultant: Boyle Engineering Corporation
Board Authorization Date: April 26, 1995
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
Submitted by: Comm ed
3 /oA
,Engineering Manager Date Construction � er Date
Approv d by: (Ap�pro d as(nto Forth: 1 r
Direetor of Engineering Date Gep� fat Counsel ate
1
Accepted by:
MLADEN BUNTIMUCTION CO., INC.
C nl or Date
i
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (12): Consideration of motion to receive, file and approve the
staff Summary Financial Report for the nine-month
period ending March 31, 1995.
Summary
Attached are the budgetary financial statements for the third quarter of the fiscal year. The Joint
Operating and Capital Outlay Revolving Fund Budget statements were reviewed by the Finance and
Personnel Committee on May 10, 1995. If any Director has questions pertaining to the statements,
please call Gary Streed, Director of Finance, at (714) 962-2411, ext. 2500.
Recommendation:
�..J That the Joint Boards of Directors receive, file and approve the Summary Financial Report for the nine-
month period ending March 31, 1995,
05 12
COUNTY SANITATION DISTRICTS
=� May 4, 1995 91 ORANGE COUNTY, CALIFORNIA
1 OB44 EW9 Av9NUE
PO.BOX 0127
V FOUNTAIN VALLEY.CAUFORNIA 9272"127
Joint Boards of Directors 014)es92411
County Sanitaflon Districts
Nos. 1, 2, 3, 5, 6, 7, 11, 13 & 14
of Orange County, California
Subject: Summary Financial Report for Nine Months Ended March 31, 1995
Transmitted herewith is the Summary Financial Report for nine months ended
March 31, 1995. The statements summarize the fiscal activities of the joint operations and
the individual Districts through the third quarter of the 1994-95 fiscal year and the status of
each with respect to the approved budgets. The combined 1994-95 budget for all Districts is
$678.5 million, of which approximately 29% is for capital expenditures for facilities
improvements and additions, including reserves for said capital projects. The total budgeted
revenue and expense categories of the several Districts are set forth below.
TABLE
COMPARATIVE BUDGET SUMMARY
(MILLIONS OF DOLLARS)
I=Base 1994415
REQUIREMENTS 1993-94• 1994-95• Decease %ai eudaet
JOINT TREATMENT WORKS 0,M 8 R $ 49.6 $ 49.5 $ (.1) 7.3%
COLLECTION SYSTEM S OTHER DISTRICT 0, M 8 R 12.6 9.5 (3.1) 1.4%
TREATMENT PLANT CONSTRUCTION APPROPRIATIONS 70.0 STS (2.2) 10.0%
DISTRICT SEWER CONSTRUCTION APPROPRIATIONS 27.4 18.8 (8.6) 2.8%
DEBT ISSUE 8 SERVICE(G.O.8 C.O.P.) 41A 39.8 0 61 5_8%
SUB-TOTAL $MLQ $185.4 $LEM
CONSTRUCTION RESERVES $110.0 $110.0 $ 0.0 16.2%
OTHER RESERVES 324.9 383.1 82 565%
SUB-TOTAL $Aa9 $493.1 S 58.2 72.7%
TOTAL REQUIREMENTS $M9 $Z85 $ 42.6 TWO%
FUNDING
CARRY-OVER $ 73.3 $ 66.1 $ (7.2) 9.7%
APPROPRIATED RESERVES 347.0 369.3 22.3 54.5%
SU6-TOTAL $903 $435.4 $ 15.1 64_.22_%
TAX ALLOCATION $ 31.9 $ 31.1 $ (.8) 4.6%
FEES 89.6 92.7 3.1 13.7%
BORROWING SQ0 84.5 24.5 12.4%
INTEREST$OTHER 34.1 34.8 __Z 5A%
SUB-TOTAL $$,t5.¢ $M-1 $ 77.5 35.8%
TOTAL FUNDING S835.9 S676.5 $ 426 100v0%
'ADJUSTED FOR INTER-DISTRICT TRANSACTIONS.
Summary Financial Report
Page 2
May 4, 1995
Included in each District's statement is a summary of the above major income and expense
categories and an itemization of their trunk sewer construction projects and respective share
of the joint works expansion. Authorized general reserves and inter-fund transfers have been
excluded from the budget column on said statements as expenditures are not charged
directly against such appropriations.
Summarized below are comments relative to the financial statements. The statements are
presented on an accrual basis and, therefore, inter-district cash transactions for fiscal
1994-95 which were accrued in 1993-94 are not reflected in the year-to-date balances.
CASH AND INVESTMENTS
As of March 31 , 1995, $384.0 of our $436.9 million in funds were invested in the
County Commingled investment program ($384.0 million in post-petition funds). There
was $7.4 million in our new treasury accounts. $11.2 million was invested with the
State of California, Controller's Office, in the Local Agency Investment Fund (L.A.I.F.).
The balance of $34.3 million, representing the debt service reserves, is in a separate
special bond fund at the County or a guaranteed investment contract, both controlled
by trustees for the various issues.
JOINT OPERATING FUND
This fund accounts for operations, maintenance, and administrative activities relative to the
Districts'jointly-owned treatment and disposal facilities. The JO expenditures along with the
self-funded insurance program costs are monitored by the Finance and Personnel Committee
and it some unexpected expenditures are experienced, they are reviewed by the Committee.
Salaries and Wages -There are several authorized but unfilled positions and, thus, some
minor payroll savings have been realized to date.
Employees' Benefits - Includes Retirement, Workers' Compensation, Unemployment
Insurance, Group Medical Insurance and Uniforms.
Chamebacks to Districts and CORF- Payroll expenses are charged back to CORF through
the cost accounting system for work on the treatment plants' capital expansion program, and
to individual Districts for work on Districts' collection facilities capital expansion projects as
well as maintenance and repair of said systems. Source Control Division charges to
respective Districts are also included in these chargebacks.
Gasoline. Oil & Fuel - Includes all fuel for motor pool. A large portion is recovered through
our equipment billing system and included in revenue below.
Insurance - Budget amount includes Board and staff out-of-county travel policy, employee
fidelity, boiler, fire, earthquake and all risk insurance policies, and pro-rats cost of the self- `..�
funded liability insurance program. Expense is in line with annual budget.
Summary Financial Report
Page 3
May 4, 1995
Memberships - Includes the cost of membership in CASA, AMSA, SARFPA, WateReuse and
other organizations. Annual membership costs are recorded when paid.
Office Expense -This account includes various types of office supplies, postage, stationery,
computer supplies and related items.
Chlorine and Odor Control Chemicals - Primarily for influent and sludge odor control at
treatment plant sites. The main chemicals used to control odors are hydrogen peroxide and
ferrous chloride. Ferric chloride is used as a supplemental odor control chemical, and caustic
soda is also used in air scrubbers throughout the plants to reduce hydrogen sulfide
emissions. Use of chlorine has been significantly reduced at the plants.
Chemical Coagulants - Expenditures for this item are required to dewater our sludges prior to
disposal to comply voth Regional Water Quality Control Board requirements.
Other Operating Supplies - Miscellaneous items such as solvents, cleaners, janitorial, tools,
lab chemicals, etc., purchased throughout the year.
Contractual Services -The major elements in this line item are payment for grit removal and
disposal at the BKK landfill and payment for removal and off-site beneficial reuse of biosolids
or sludge. These costs will increase in the second quarter because of disputes at the thermal
composting site.
Professional Services -Primarily consists of General Counsel's fees, other legal services,
audit fees, and miscellaneous consulting services.
Printing and Publications - Includes all reproduction activities in-house and with outside
services.
Equipment Rental
Outside Equipment Rental - Primarily for the rental of large cranes and equipment
necessary for removing and replacing major pumps, engines and other large
equipment during the course of maintenance and repair operations.
CSDOC Equipment Rental - Reflects the charges for District-owned equipment used
for overhead type activities. There is an offsetting credit applied through the cost
allocation system for these charges.
Repairs and Maintenance -This item includes parts and supplies for repair of plant facilities.
Escalating costs continue to have an impact on this item. Generally, this account runs close
to budget each year due to the unpredictability of major equipment failures.
Research and Monitoring - Budget includes funds for the ocean monitoring contract required
by our NPDES permit. Other projects include operational research and evaluation of
processes to develop optimum operating parameters, and also include the Districts' annual
share of participation in the Southern Califomia Coastal Water Research Project
Summary Financial Report �
Page 4
May 4, 1995 U
Travel. Meetings & Training - Major items are authorized by specific Board actions.
Expanding activities of regulatory agencies and the Clean Water Act reauthorization have
required additional staff and Board travel. These costs are reviewed separately by the
Finance, Administration and Human Resources Committee.
Utilities -The major item in the Utilities Expense Account is for natural gas purchased for
central power generation. Total utilities expenses are in line with the budget, and are down
$330,877 from last year.
Other Expenses - For items not chargeable elsewhere such as freight, safety supplies,
grounds maintenance supplies, etc.
Prior Year's Expense -This account is required by the Uniform Accounting System and
represents adjustments to an operating or non-operating account balance from the previous
year or payment of charges which could not be accrued at year end. Generally, all expenses
to this account are recorded in the first quarter.
Allocation to Districts and CORF -This is an account established in connection with the cost
accounting system and represents materials, supplies and services, overhead chargebacks
to the individual Districts and CORF.
CAPITAL OUTLAY REVOLVING FUND
This fund accounts for the costs of expanding and improving the Districts'jointlyowned
treatment and disposal facilities and represents an average of 37% (excluding reserves) of
each Districts' budget requirements for 1994-95. During the first three quarters, $18.0 million
was expended on joint works treatment and disposal facilities improvement and expansion
projects. The pro-rats share of joint works improvements and expansion costs is reflected in
the financial statements of the respective Districts.
INDIVIDUAL DISTRICTS -The statements reflect the accounting transactions for the nine
Districts and include each respective District's share of the Joint Operating Fund and the
Capital Outlay Revolving Fund.
Taxes: Tax revenue is allocated to two separate accounts:
Tax Allocation -This account represents the anticipated allocation of the Districts' pro-
rate share of the maximum 1% basic property tax allowed under Proposition 13.
Amounts received in the first quarter are essentially late payments from last year.
Tax Lew - This account represents tax funds necessary to make voter-approved
outstanding general obligation bond principal and interest payments. In
accordance with the Jarvis-Gann initiative, tax levies to satisfy these obligations
are not restricted. Only District 11 has a 1994-95 tax levy for bond service. �..i
Summary Financial Report
1 Page 5
May 4, 1995
Federal and State Construction Grants - EPA and SWRCB have historically funded up to
87 Ys% of treatment plant construction for approved projects. All outstanding grant
funds have been received and no new grants or SRF loans are budgeted.
Fees - All Districts now have an adopted, uniform sewer connection fee schedule. This
account also reflects industrial waste user charges levied by seven of the nine Districts
pursuant to the Uniform Industrial Waste Ordinance and the Revenue Program, and the
user fees implemented in Districts Nos. 1, 2, 3, 5, 6, 7, 11 and 13. Annexation fee
revenue is unpredictable and, thus, is not included in the budgets unless there is an
existing agreement providing for payment of fees.
Sale of Caoacity Rights - This account records income from sale of capacity rights to
outside agencies such as SAWPA, including the capital replacement charge. SAWPA
has been invoiced for an additional capacity purchase, but the charges are being
negotiated and have not been paid.
Other - Includes the annual joint facilities interdistrict equity adjustment required by the
recalculation of the respective ownership percentages. Cost of this adjustment for
purchasing Districts is included in each District's Share of Joint Works Construction.
Share of Joint Works Construction - Represents each District's share of joint treatment
and disposal facilities expansion discussed above under Capital Outlay Revolving Fund
(CORE), and the purchase of joint facilities interdistrict equity when appropriate.
Bond Retirement and Interest Exoense - Payment of principal and interest on
outstanding general obligation bonds and certificates of participation of the respective
Districts. Annual budgeted expense for all Districts is approximately $36 million.
Share of Joint Operating - Represents each District's share of operating and maintaining
the jointly-owned treatment and disposal facilities, and administrative activities. Costs
are distributed based upon each District's respective gallonage flow (see Joint
Operating Fund statement for details).
District Ooeratinn and Other Expenditures - Consists primarily of individual Districts'
general operating expenses, industrial monitoring, operations, maintenance and repair of
the respective Districts' collection systems.
DD:GGS:Ic
J:INRDOL�FN1tAPNE W RTIV.gPIMNY-06.OR
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
SUMMARY JOINT OPERA7ING/WORKING CAPITAL FUND BUDGET RENEW
9 MONTHS ENDED W145
APPROVED r
BUDGET YEAR-TO-DATE UNEXPENDED YEAR-TO-DATE
1994-86 EXPENDITURES BUDGET %EXPENDED 1� J
SALARIES,WAGES S BENEFITS
Salaries S Wages 3D,756,000 21.451.820 9.306.180 69.74%
Payroll Sona0 s 6,460,000 4,612,322 1,847,678 71.40%
TOTALPAYROLL 37,219,000 2ED64,142 11,153.858 70.03%
Leas: Chergeouts W DISM S CORF (10,400,000) (7,020.617) (3,379.383) 67.51%
NETJOINT OPERATING PAYROLL 26.818,000 19,043.625 7,774.475 71.01%
MATERIALS,SUPPLIES S SERVICES
Gasoline,Oil& Diesel 175.000 135.577 30.423 77.47%
Insurance 1.200.000 929.703 270.297 77.48%
Mombershipa 56,000 78.503 (20.503) 135.35%
OMoe Expense 435,000 205.363 229,637 47.21%
Chlorine 809or Control 2.580,D00 1.979,271 600,729 76.72%
Chemicel Coagulants 1.145.000 853,474 201,526 74.54%
Other Operating Supplies 1,007,000 $48,315 458.686 54.45%
Contractual Sarvicas 6.825.000 5,209.695 1,615.305 76.33%
Profeaalonal Services 1,15g000 1.107,972 5.717.026 16.23%
Printing 6 Publication 330,000 213.851 116,149 64,80%
Equipment Rental 216.000 176753 38.247 82.21%
Repair B Maintsnance 3.675,000 2,453.984 1,221.016 68.78%
Research S Monitoring 3.050,000 2,044,127 1.005.873 67.02%
Travel,Meeting B Training 250.000 132,909 117,091 53.16%
Uncolleclible Accounts 26.000 0 25.000 0.00%
Utilities 3,915,000 2,203,448 1,711,552 56.28%
Other Expenses 900.000 411A422 415.578 53.82%
Prior Years Expanse 25.000 86.865 (61,866) 347,46%
Non OperoUng Expense 80,OOD 61.717 (1,717) 102.86%
V
TOTAL MATERIALS SSERVICES 27,024,000 18,905,949 8,118,O51 69.96%
Leas: Allocation to Dist,S COW (BOD,000) (340.283) (259,717) 56.71%
NET JOINT OPER MATERIALS S SERVICES 26,424,000 18,565,686 7,858,334 70.26%
TOTAL JOINT OPERATING EXPENSES 53.242.000 37.609,191 15,632,809 70.64%
REVENUES
Revenues (3,710,000) (2,958.709) (751,291) 79,75%
Less: Allocation to Dlsts S CORP 10.000 12764 (2764) 127.64%
NET JOINT OPERATING REVENUES (3,700,000) (2.945.945) (754.055) 79.62%
NET JOINT OPERATING EXPENSES 49,642,000 34.663.246 14.878,754 69.97%
GALLONAGE DATA
M.G.FLOW CHARGES
DISTRICT BUDGET TO DATE BUDGET TO DATE
1 6.385 61570 3,674,730 3.401,60
2 21.125 21.357 12,157.691 11,048,3W
3 19.667 20,390 11.319.333 10,548,005
5 2.336 2.569 1,344,980 1,329,190
6 3.039 3,06E 1,749,195 1,SW,448
7 5.532 5.641 3.183,819 3.021,383
11 3,955 4,528 2.276,718 2,342,228
13 654 663 376,599 393.155
14 1.624 2,013 934.747 1,041,585
64.317 67.006 37.017.782 34.663.247
CAPITAL OUTLAY REVOLVLNO FUND SCHEDULE B-F
SUMMARY OF JOINT WORKS CONSTRUCTION REQUIREMENTS Pella 1014
FISCAL YEAR 1994.95
9 MONTHS ENDED 3131196 Prepared By: Big Aldridge
11 12) 131 121 + (31 Ill-131 MEMO
WORK REVISED TOTAL REQUIRED ACCUMULAiTE CURRENT YEAR PROJECT UNEXPENDED COMPLETED JOBS
ORDER PROJECT EST BUDGET COST OUTLAY COST BUDGET TRANSFER TO
1994-95 1994.95 @6/30/04 TO 3131195 TO DATE FIXED ASSETS
A. Reclamation Plant 1 New and Re0 algeted Meer Projects:
1.Secondary Trmt Expansion io 80 MGD,P1 36 53717-0 41,600,000 1,750,000 3.566,502 127.709 3,694,210 1.622,292
2.Electrification of Pump Drives,P1-36.1 53717-A 1.720,000 1,200,000 161.290 841.863 1,003,143 358,137
3.Secondary Treatment Expansion,Pt-36.2 53717-6 490.000 400.000 Z6.129 64.293 80.422 346.707
4.Primary Treatment 72 MGD Expansion,Pt-37 53719.0 28,625.000 1,000,000 141.273 18,804 160.077 981,196
5.Security&Landscaping,P1-38.1 521M-F 1,700.000 11000,000 743,293 808,735 1,552,028 191,265
6.Misc.Mods.Priority Elements Pt-38.2 5210E-G 5.060.000 2,500,000 2.657.416 2.O110.255 4.737.671 419.745
7.Miss.Modification.P1.38.4 52108-11 3,325,000 2,000,000 9301066 952,144 1,882.210 1.047,856
B.Fire Protection, Signege and Water Dist. Mods.,P1-38.6 52108J 3.200,000 1,OOD.000 369.056 72,218 440,274 927,782
9.Elect FecllitY Martins&Safety Upgradea,P1 40-1 52187-A 3.330.000 5001000 59,057 64,122 123,179 435.870
10.Fee Hankins&Safety Upgrades,P1.40.2 52187-8 5,025.000 500.000 244.148 39,431 283.679 460,569
11.From Clarifiers 3A&5 Rehab. PI-41 52199-A 2.560.000 500,000 91,128 111,146 202,273 388.855
Transfer to Project Below 110010001 (100,000)
Clarifier Dome Rehab at Reclamation Pit 1,PI-414 52199-C 100,000 100.000 613 30,438 31,051 69.552
12.Seimic Retrofit of Non-Structure Systems, P1-43 52229-A 4,760.000 21000.000 110,473 5,768 110.241 1.994.232
13.Seismic Retrofit Stru nual.P1-44-1.2.3 52125.8 8,400.000 1,800,OD0 778,467 276,885 1,065,352 1.523,115
14.Chemical and Wa9lehaaler Facility Modilns,Pt-46 52239-A 1,920,000 11000.000 281.560 55,746 337.306 944.264
15. 12KV Distribution System for Support Facilities.PI-47 52255-0 2.280,000 2,000,00D 1,364 117,686 119,050 1.882,314
16.Misc Mchhectural&Treatment At Imp wets,Pt-48 52268-0 1.870,000 1.000.000 62.329 36,998 99.327 963.002
17. Miscellaneous Projects,Pt-49 5,460,000 250.00D 250,000
18.40 MGD Oxygen Actlyated Sludge&DAF's 66,483,000
19.Bob Presses 14 Unital 14,300,000
20.Solids Storage 14 BIna1 10,177.000
21.Digester.: 2 @ 110' Diameter 9,100.000
22. 12kv Electrical Power Distribution 2,477.000
23.Emergency Sewage Bypass System 1,922.000
24.Ramove Trickling Filters 1 &3 1.300.000
25.Misc.Job Plan Projects (See Schedule CI 27.125,000 1.00 '000 18,691 106.896 126,587 893,104 (38,347)
26.Other Meter Plan Project.
a.Headworks No. 1 Rebuild.2003 14,950,000
It.Headworks No.2 hnpa9ar/Pumy Speed.2016 2,600,000
c. Ramona Trickling Filters 2&4.2007 1,300,000
n.40 Mgd Oxygen Act'd Sludge&DAF, 2017 34,ODO.000
a. 110-1t Digestive, 2003&2012 18.200,000
1.4 Balt Presses, 2004 10.920,000
g. 12 KV Power Mstributlon.2MI.2012 1,099.000
h.Standby Power Generation. 2005&2015 4,914,000
i.72 MBd Primary Treatment. 2004 As 2012 32 500.000
SUBTOTAL -RECLAMATION PLANT 1 373,772,0 GG 00 21.400, O 10,241,845 5.801,136 16.042,960 15,598.Bfi5 136.3471
CAPITAL OUTLAY REVOLVING FUND SCHEDULE B-I
SUMMARY OF JOINT WORKS CONSTRUCTION REQUIREMENTS Page 2 of 4
FISCAL YEAR 19i
9 MONTHS ENDED W31195
111 121 13) (2) + (3) Itf-(3) MEMO
WORK REVISED TOTAL REQUIRED ACCUMULATE CURRENT YEAR PROJECT UNEXPENDED COMPLETED JOBS
ORDER PROJECT EST BUDGET COST OUTLAY COST BUDGET TRANSFER TO
199495 199496 @ 6130194 TO 3131195 TO DATE FIXED ASSETS
B.Plant 2 New and Rebudgated Major Projects:
1. Suppon Facilities and Site Improvements
a. Operations Building.P2.2351 53715 O.A 3,175.000 550,ODO 2.761.789 513,066 3,274,857 36.932 (2,935)
b. Warehouse Building, P235-2 51813-H 3,130,000 2,000,000 247.075 58.517 305.692 1,941,383
c. Maintenance Building,P235 3 51813 F 3,500,000 2,000,000 208,039 45,831 263,870 1,964,169
d. Phase It Site& Security Imp..P235.5 51813E 2,475.000 1,3001000 120.021 52.025 172.046 1,247,975
a. Construction Management Office. M 0441P235-41 51813.G 535,000 250,000 195.846 74,985 270,831 175,016
2. Rehab 7 Digesters.P239-1,2,3 52045.0 11.100,000 600.000 418.569 103,149 521,718 496,851
3. Primary Treatment 24 MGD Expansion,P2 41 537140 14,300.000 4,597 4,597 0
4.Secondary Treatment Expansion, P2.42 2 53718 0.8 17.900,000 5,000.000 11.120.047 3.876,828 14,996.875 1,123.172
5.Priority Misc.Mod..P2.43.1 52108 B 5.350,000 70Q000 4,055,359 862.670 4,918,029 1162,6701
S.Misc. Modifications.P2.433 52108E 2,150,000 1,350,000 722,658 1,873,467 2,596,125 (523.467)
7. Monitor/Control System, P2-44 520940 7.230,000 2,700,000 2,038,578 112,745 2,161,323 2.587,255
8. Fire Protection.Signs&Water Dist. Acorns, P2-46 521760 4,780,000 2,500.000 257,239 152,421 409.660 2,347,579
9. Elect!Fee Modulus&Safety Upgrades,P2-47-1 52189 A 4,050,000 1,500,000 54,440 46.434 100,874 1.453,566
10. Fee Morilre&Safety Upgrades. P2-47.2 52189.0 4.610,000 2.000,000 247.332 35,793 283,125 1,964.207
11. Primary Clarifier Rehab. P2 48 52199 B,E 5,630,000 1,500,000 129,034 223,425 352,459 1.276,575
12.Saimic Retrofit of Non-Structure Systems, P2-50 52229 8 5,20D,000 2,000,000 149,673 15,185 164.858 1,984,815
13.Seismic Retrofit Structural P2-53.2,3.4,5.6 52108C 11,360,000 2,500,000 2,880,310 249,187 3.129,497 2.250,813
14. Chemical and Plant Water Moil P2 55 52239.5 2.600,000 2,000,000 178.698 65,800 244,398 1.934.200
IS.Miac Seismic Machine&Flare Improvements,P2 56 522690 250.000 150,000 17,434 2,214 1IL648 147,786
16.Miscellaneous Projects, P2 57 5.260,000 250,000 250,000
17. Solids Storage: 2 Bins 5.200,000
18.Additional 105 Foot Digester 3.900,000
19. Plant Water Pump Station 1.170.000
20. Misc. Job Plan Projects (See Schedule Of 27,250,000 1.000,000 24,551 140,954 166,505 859.046 (66,365)
21.Other Master Plan Projects
a. Replace Primary Basins A. 8,C. 2006 11,700.000
b. Standby Power Generation, 2005& 2015 10,000,000
c.Monitoring and Control System, 2005 520000
SUBTOTAL -TREATMENT PLANT 2 174,325.000 31.850,000 25,831,189 8,604,798 34,335,987 23.346,202 169,3001
C. Water Reclamation Regional Expansion 77,000,000 400.000 400.000
Transfer to Projects Below 11,441,8001 147,103) 0 147,1031
Reclmation Plant No. 1 Water Quality Management Study 58231.0 280,000 932 BOB 932 1,540 0
OCSDIOCWD Regional Water Reclamation Plant Study 52133E 400,000 41,334 3,004 41,334 44.338 0
Reclamation Plant 3 Preliminary Studies&Feasibility Report 52133 A 761.800 4.837 552,107 4.837 556.944 0
SUBTOTAL- WATER RECLAMATION REGIONAL EXPANSION 77,000,000 400.000 555.719 47.103 602,822 352,897 0
CAPITAL OUTIA Y REVOLVING FUND SCHEDULE B-1
SUMMARY OF JOINT WORMS CONSTRUCTION REQUIREMENTS Page 3 of 4
FISCAL YEAR 1994.95
9 MONTHS ENDED"1/95
It) 121 13) (2) + 13) Ill-131 MEMO
WORK REVISED TOTAL REQUIRED ACCUMULATE I CURRENT YEAR PROJECT UNEXPENDED COMPLETED JOBS
ORDER PROJECT EST BUDGET COST i OUTLAY COST BUDGET TRANSFER TO
1994-95 1994-95 @ 6130194 TO 3/31/96 TO DATE FIXED ASSETS
D. Inmrplant and Joint Facilities
1. Support Facilities and Site Improvements
a. Demolition of Old Lab.J-11.1 52083 A 400,000 25O.000 8.301 18,390 26,691 231,610
b. Monitoring&Control System.J-23-2&J-31 53712-8/62215 0 7.O25.000 2,200,000 2,655.398 1.243,381 3,898.779 956.619 19,035)
Transfer to Project Below (263.255) (263.256)
SCADA Retrofit Hardware Mailarm at Pats 1 & 2 52215-A 2,200.000 263.256 263.256 263.256 0
c.Personnel Building at Pit 1.J-26 53716-0 1.310.000 40(),000 141,168 24,135 165.303 375,865
d. 3-Story Adman Annex at Old Lab Site, J 3O 62083-0 3.110.000 107,652 107,662 0
e. Demolition of Old Control Center 100.000
I. Demolition of Support Bldg.@P2,J-27 52094.0 250.000 50.000 90.374 19.130 109,504 30,87O
g. Central Lab Expansion J-17-2,3 52257.0 706,O0O 100,000 87,377 68.965 156,342 31.035
Transfer to Project Below 127,4671 127.467)
Punch&Intl of Racks to Secure Gas Cylinders&Dewar 52293-0 27,467 27,467 15,749 15.749 11,718
2.Outlall&Booster Pump Stations
a.Surge Tower Replacement.J-34.1 52241-0 616001000 2.000.000 574,812 193,637 768.449 1,806.363
b.Gullall Reliability&Pumping Annex DOSS'C' 31,085,O0O
C. Ext&Feel 78-to Deep Water w/120'Outlall 51.269,000 1001000 100=0
3.Computerized Fac.Records and Dwg. Sys.J-25.1 58216.0 2,700,O0O 75O,O00 195.662 8.298 203.960 741,7O2
4. Electl.Power Systems Rehab.Studies J-25-2 58216-A 2.970,O0O 300.000 6.8O7 8.154 14.961 291.846
5.Collection System Mapping 100.000 100,000 1001000
S.TelaphonefTelemetry Monitoring Exp.J-28 52146.0 4O0,O01D 25,000 233,551 431 233,982 24,569 (233.551)
T. Standby Power Reliability Modif rs.J-33 52240-0 5,390.000 50%ODD 352,098 64,839 416,937 435.161
8. Suahard Interplant Trunk Replacement 31,000.000
9. Sludge Disposal Projects
a.Compost Demonstration Plant 9.000.000
b.Land Acquisition 22.000,000
c.Landfall Development Phase I 28.600000
J.Compost Facility 50.000000
10.District Information Management Network
a. Mainz.&Oper Mgmnt Computer System 52149 A 260,000 250,000 856,758 3%544 887,302 219,456 (149,267)
Transfer to D. Item 13(Schedule EI 125,000) (25.000)
b.Lab Information Management System Upgrade$ 52149.8 375,000 275,000 31.808 15.965 47,773 259,035
Transfer to D. Item 13(Schedule E) It O8.1OT1 11O8.107)
c. Financial Information System 52149-C 1.150,000 750,000 312.733 1103,6601 209,073 853,660 (12.1901
d.Network System Integration 820.000 340,000 340,OO1
e. CD-Optical Data Archiving 75,O0O 50,000 50.000
CAPTAL OUTLAY REVOLVING FUND SCHEDULE 0-1
SUMMARY OF JOINT WORKS CONSTRUCT/ONREGUDIEMENTS Fag.4 of 4
MSCAL YEAR/99 95
9 MONTHS ENDED 3/31/96
Itl (21 (3) (2) * (3) Ill-(3) MEMO
WORK REVISED TOTAL REQUIRED ACCUMULATE CURRENT YEAR PROJECT UNEXPENDED COMPLETED JOBS
ORDER PROJECT EST BUDGET COST OUTLAY COST BUDGET TRANSFER TO
1994-95 1994-95 @ 0/30194 TO 3/31/95 TO DATE FIXED ASSETS
11. In-Mant Sampling System Mpdifn 140.000 140.000 140,000
Transfer to Project Below (25.000) 125.000)
Pit 2Influent Sampler Upgrades 52311 0 251000 25,000 24,681 24.681 319
12.Other Master Plan Projects
a. Sludge Disp. Landfill Phase II 2011 15.6001000
b. Sludge Deep. Equip Phase I&112001 11.500.000
c. Electrical Power Distribution, 121v 2,)0).000
13.Misc Job Plan Projects (See Schedule E) 19,025.000 1,000,000 87.074 82,667 169.741 917.333 (45.864)
Transfer from 0. Items 10 a&b Projects Above 133,107 133.107
SUBTOTAL INTERPLANT&JOINT 307.909.467 9.680.000 5.741.573 1,978.5621 7.720.1351 7.601,438 1449.9071
SUB-TOTAL - MAJOR PROJECTS 933,006.467 63.230,000 42.370,326 16,331.598 58.701,924 46.898,402 1557.554)
E. Special Proiects.Studies,Research&Development
1.Action Plan:
e. NPOES Permit(Applicatlonl 58209 F 425.000 50.000 393,680 21,696 415.376 28.304
b. NPDES Permit IMoniuning Changes) 1001000 50,000 50,000
2. Solids Treatment,Disposal and Rouse 111501000 150.000 1501000
Transfer to Project Below (1,235) 0 (1,2361
Sludge Disposal Related Projects 582140 1.235 258.431 1.235 259,666 0
3.Air Quality Central Program
a.Tonics and ROG Control:Bioldler R&0 58227-0 300,000 250.000 135,981 118,437 254,418 131,563
b.Air Emissions: Source Control Feasibi5ry Study 50,000 50.000 50.DD0
c. SCAOMD Rut.431.1:SWIur Control&CEMS 100,000 100.000 100.000
d.SCAOMD fluty 1402:Air Tonics 2001000 200.000 200,000
e. Air Quality Management Implementlax n Plan 582320 375,000 275.000 13.113 8.527 21,640 266.473
I.Parameter Monitoring System for Co.Gen 582350 400,000 300,000 3.322 3.322 296.678
9.A.Q. Database Development 75,000 50,000 50.000
4.2020 VISION Master Plan Update 3,103,000 100,000 100.000
SUBTOTAL SPECIAL PROJECTS 6,278,000 1,5T5,000 801,205 153,217 954.422 1,421,783 0
F. Equipment Items 53.225.000 3,000,000 459.559 1.101.210 1,560,769 1,898,790 ry,])8A491
SUB-TOTAL-JOINT WORKS CAPITAL REQUIREMENTS 992.509.467 6T,805,000 43.631,090 17,596,025 61,217,115 50.218.975 11.836,0031
CONSTRUCTION IN PROGRESS COMPLETED AT 6/30194 SCHEDULE F 111,188.042 392,936 111,580.978 1392,936) 1109.522,8581
TOTAL JOINT WORKS CAPITAL REQUIREMENTS 992,509.467 67.805,000 154.819.132 1T.9T8,961 172,798.093 49,826,039 1111.450.8811
C
Cpumy Sandatlon District No.1-14
v Summary Quarterly Financial Report
9 ManNa Eachre"iRi
( Budget Review
1994-95 Repairing Yaer-b0afe
Budget If... Dets Budget %Eepentlel
Repairing Fund Balances,Jury 1 BO IS11,414
Tax Lev,(Bond Funds)Only) 17.ODO 10,ID0 8,900 62.94%
Tax Allocallonsl5ubvamlone IShere of l%) 31,118.000 18,991,049 14.154,651 51.55%
Federal and Slate Constructlon Grants 0 a 0 0.00%
Connec0on Fees 4,99a,000 5.M.154 (639,154) 1127M
IRWD 1. 20,400.000 9=010 11,177,902 45.21%
Me,Fars 67AO,OOo 40,931,219 28.W.M eo.d6%
Selo of Wpaclty Rights 392.000 14.583,11W (14,2U1,SM 372265%
Interest d Misc.Receipts 33.971,000 15.843.903 18,1W,1W 4664%
oMer 9pgs,o00 748,809 8.149,197' )86%
Tonal Revenues 1W,su.m 103,976Ag) 63,712,O11110 6201%
Total Revenue is Beginning Balances 908,130,W4
EXPENDtWBE5
Share of Joint Works Tra -Plain B Reserves 192,526,000 17,981,080 174.584,920 9.33%
Might Trunk Sewer ConeM.d Resrrvrs 18,750,000 II.M.551 6,813,449 03.86%
COPIBond Retirement and Interest Expenae T,302,OW 14,424,397 8$8W,6W 18.T9%
Share of Joint Waft Opeatig Expenses 48,542.000 34,083,247 14.878,753 W.97%
Provided for RelmbursemeM Agmemams 109,000 0 tod000 G.00%
District OpereMgdOMer Expentlituma 9.492,000 5.M.031 3,023,056 69.87%
Total Expenditums 347,801,U00 µ719,206 263,01 24.36%
Ending Fund Balances 823,41/,9W
Facll0ba Expamlon
BNRICe Ad(usbnents Transfarba Ruder.
711e96 dA00ria. Fhmd Aaeas Y51196
CONSTRUCTION IN PROGRESS:
Dlaplcts 1.14 C.talb N.n In Pmgmss 12,eM.e26 11,938,551 (VIHIA 4) 21AN.M
Sharaof Jobr WOM1a 0.900,11" 17,961,080 (4,601,928) 61.339,223
COMPLETED PROPERTY PLANT d EOU1P:
tan0 and Properly Rights 2,835.4n 0 2.M.472
Collection Lines and Pump Stem. 272.747.612 Z702,392 W5,050,000
Treatment Facili0ea 191922 0 19,9W
Olepoaal Faelll8es 101.528 0 101,528
General Plant and Admia.Fecil, 612.782 4.393 855,175
Equity In Joint Tmalment Feel. 067.501,383 (1.OW.297) 4,001,028 691,046,013
Mar Assets at Coat Lees AIo IIZIK0 (74.=) 63.819 IW,424
Total Property Plead d Equip. /,O2A,WE236 211.781 (0) lMSe2,534
�I
Lowry Sanitation aWtt 1
SummaryQuarterly Financed Report
e Monhe Ended"I95 r
Budget Resider
1994-95 Remaining Yeanlo-0me
Budget Year{ ate Budget %Expended 1 ,
Beginning Fund Balances,July 1 38,549.092
REVENUES:
Tax Levy(Bond Fund(.)Only) 0 0 0 0 00%
Tax AllouOonsr5u8van8pns(Sham of l%) 2,105,000 1012,014 1.002,886 48.08%
Federal and Stale COMWWen Grants 0 0 0 000%
Connection Fen 71,000 22140 48.750 31.32%
Mar Fen 6,472,91I0 3,853,037 ZB1e,980 5644%
Sala of Capacity Rights O&000 1p25.792 (1,387,792) 3752,08%
Interest&Misc.Receipts 2.374.000 1,500.102 8n,898 53.19%
Mar 0 D 0 GAO%
Tout Revenues 11.0B0.000 7.613,185 3,446,815 68.BP6
Tout Revenue&Beginning Balances 46,162,2TT
IX ENORURES:
Shan or Julnt Wads Trent Plant&Reserves 10027,00D 1]54.798 16=012 913%
DIaMd Tm lk Sewer C...V.&Reserve. 125,000 12.119 112,881 9 TD%
COPISond Retinmemand Interest Expense 9.532.000 1,860.048 7,8n,054 1949%
Sham of Joint Works Counting Expenses 4,918,00D 3.401,893 1.516.10T 6917%
Provided for RelmOunenenl Agmemanu 0 0 0 COD%
DlsMct Opantlng a GMer Expenditures 592.000 379.216 212,784 W(16%.
Total Expenditures 33,194,000 7,406.072 25,T8T,938 22.31%
Ending Fund Balances 38,756,205
Facilities Expansion
Sal... Adjustments Tmnsfer[n Balance �I
711194 &Additions Fixed Assets Mims
CONSTRUCTION IN PROGRESS:
Miscellaneous Change M Closed W.O.0 0 12,119 12,119
Sub-Toul 0 12,119 0 12.119
Shan of Joint Wonu 4,608,599 1154.798 (449008) 5.9937U
SutrTDul 4.080,699 1,754,798 (449,608) 5.993.788
COMPLETED PROPERTY.PLANT&EQUIP,
.and and Pmpeny Rights 81,398 81,398
Collection Lines and Pump SM. 6.BBB,869 6.800.669
Treatment Facilities 0 0
Disposal Facilities 11,593 11,593
General Plant and Admin.Facll. 58.241 59241
Equity in Joint Tmament Facll. e8,9B6,558 (103.298) 4491600 69.332,868
Other Assets at Cost Less Amon. 0 0
Tool Properly Plant&Equip. 80.715.OSS 1.60,619 0 82,378.6n
Ceuaty Senimdon DmWCI No,2
Summery Quarterly Financial Report
9MonfMEncadWfAS
L BudRet R.I.
IW-95 Remaining Yomrm-Date
Budget yaer-WAats Budget %Expended
Beginning Fund Balances,July 1 ]2B,1N,N6
REVENUES
Tax Levy Bond Funds)Only) 0 0 0 0.00%
Tex AllocationslStmventlon(Share of l%) 9.515,000 5.181.101 4,333,899 54.45%
Federal and State Consmuction Grants 0 0 0 0.00-4
Connection Fees 2,599.00 2.443,481 155,N9 94.02%
Other Fen 22.639.000 14,00Z737 8,636,263 61,85%
Selo of Capacity Rights 116,000 4.310.240 (4.M2,240) 3722.62%
Interest&Mi..ReadpM 9,961.000 4,672.4141 5,288,959 4690%
Offer 0 0 0 0.00%
Total Revenues 44,830,00 N,617,00 14,212,430 68.30%
Total Revenue&Beginning Balances 2N,70016
EXPENDITURES:
Share of Jolat Works Tmtl.Plant&Reserves; 56,701,000 5,314,6N 51.308.310 9.37%
District Trunk Sever Conabr.&Reserves 3.650.000 2,659,770 090,230 72.87%
COPIBand Randleman!and Interest Expense 26,9$2.090 4.05.116 n.086,6N 18.05%
Sham of Joint Works Operating Expenses 16,271.000 11,0491360 5,222,650 67.90%
Provided for Rolmbumement Agreements 0 0 0 O.N%
Dlemd Operating&Other Expenditures 2.225.000 1.480.362 134,838 00.98%
Total Expenditures 105.799,000 25,376,282 80,420,718 23.99%
Ending Fund Balances 231,386,234
Facilities Expansion
Balance Adjustments Transform Balance
V1194 Baddition. Fixed Assets 31N65
CONSTRUCTION IN PROGRESS:
2-14-SR2 SARI Manhole 1,N0 20.394 n.054
2-7A Atwood Subareas @ 91157 Interchange D 1.512 1512
248 Olive Sub"nk&SAR Crossings for SA.Monolog 0 11,N8 11.348
Pump Sins U.P.S.Addn. 0 3,N7 (3,967) 0
24.1 Lincoln Inameopter Sewer 28 28
246 Sewer Encasements for AT&SF Commuter Rall 4,997 8,651 13,N8
2-5.2 Orange&Olive Subteunk 2,931 2,931
2.32 Sawed,Trunk Line Diversion Gate&Monitoring Sys. 1N (IN) 0
2.31 SARI Relief Sewer 63535 N (03.619) (0)
2.9411 Cypress Ave.Submunk Sewer Rehab. 322,804 2.611827 2,934.431
MISC ChgS to Closed Work Orders 9,258 (5,260) 3,998
2-35 Euclid Trunk&Intercepter 721 7,446 8.167
Sub-Tote! Q6,038 2,659,"0 (07.00) 2,990,116
Share of Joint Works 14.155699 5.314684 (3,N1,710) 18,108,672
Sub-Toal 14,155,699 5,314,684 (1,361,710) 18,108.672
COMPLETED PROPERTY PLANT&EOUIP:
Land and Property Rights 517,694 517,694
Collection Linn and Pump Same. 93,692,317 1N 23,692,421
Treatment Facilities 0 0
Disposal Facilities 33,172 33,172
General Plant and Admin.Fad[. 211453 3,NT 215,420
Equity in Joint Treatment Fact. 205,314,717 (312.855) 1.361,710 206,363,572
Offer Assets at Coat Lace Amort. 29.715 (29.738) 63.819 63,590
Total Property Plant&Equip. 314.360,805 7,631,063 (0) 321.992,667
Cosetir SestaBon UlsOPct No.3
Summary Ouartery Financial Repn f
911fionms Ended"lex,
Budget Revlmv
1994.0 Remaining yxxal OxM
Budget ylftu Oats Budget %Expended I
Beginning Fund Balances.July 1 21B,Ba3,6e
REVENUES:
Tax LM(Bond Fondle Only) 0 0 0 0.00%
Tax MiccationslSubvenWna(Shns of l%) 10.515,000 5.911.010 4,703.990 55.69Y.
Found and Slate Cunmuction Gents 0 0 0 0.00%
ConneNon Fee 1,410,000 1.554.6m (14a.53a) 11035%
Mar Fee n,1W,W0 13.431,099 8.688.901 Gi
Sew o Capacity Rights 123.000 4,563,411 (4,440A11) 3710.09%
moment&she.Receipts 10,211.000 4.700,908 5.510.092 46.01%
Other 3.2n.000 0 3,273,000 0.00%
Total Revenue 47,752,W0 30,160,962 17,691,038 63.16%
Total Revenue&Beginning Balances 20,044,651
EJ(PENOITLARES:
Share Of Me Vismlm That.Pint&Reserves 55.813,000 5.616,430 50,106,620 10.05%
planned Trans Sewer Other.&Reanea 1,427.000 929.113 497.387 65.11%
COPIBond Battlement end honest Exeeas 23.862,000 4,504,087 19.357,913 18A13%
Shaft of Jul M Works Opaepng Expenses 15,149,000 10.548,W5 4.600.995 69.0%
Pe ldd for Relmgumemmd Ageemems 0 0 0 0.00%
District Opening&Other ExpaMlMfte 2,512.000 1.590.949 921.051 63.33%
Total Expenditures 90,263,000 23,188,584 75,574,416 23A8%
Ending Furth Balances 225,BS6,O6T
Facilities Expansion
Balance Adjustments TranawrM Balance
TIM &Additions Fixed success; Mims
CONSTRIXTIONW PROGRESS:
34a2 Lampson memento,Sewer 1012n1 (10,291) 0
3 nOmnge VAwtm Sub-TmnkRller Sewer 50,537 72 55.609
11-17 Slater P15 Upgmdo-3&11 582,295 274,355 B%,6W
346 Techke Pipe Repwcemeo 348,502 320,702 en.204
345R Reel.Westmlmter Ave.come Mains 141.844 5T1801 199,445
34714 WMenillg Pmjem 7,872 W6 B.ln
340 MIIher44oderTrunk Sewer lmpftvements 71.20 242.541 313.741
3484 hapev.to Mllhm44older Tmnk Sewer 0 17.840 17.840
3-39 MIIW-ROMm Fsasmsat 0 4,486 4.486
Pump Slits.U.P.S.Arlon. 0 1,983 (1,983) a
m4 lheneous Chayes m Cloned W.O. 21 1.028 (5) 1.044
Sub-Total 1,218,362 929,113 (12,270) 2.135,197
Shan of Joint Works 15,049,700 5,616,430 (1639.023) 19,227,107
Sub-Tctxl 15.049,700 6,61g430 (1,439,Ot3) 19,327,1W
COMPLETED PROPERTY.PLANT&EQUIP:
Land and Property Rights 2B0.231 280,231
Collection Ones led Pump Slm. 62.059.523 10,295 62.069.818
The armed Facilities 9.9n 9.922
01sposai Facilities 28.419 28,419
Geeei Plant and Admin.Facil. 316.008 1.983 317,991
Equity In Joint Treatment Facll. 215,002.228 (330.618) 1,439,023 216.110.633
Other Acouta at Coal Leas Amort- 1.405 (1p05) 0
Teal Pr0pady,Plant&See], 293,965,799 6,213,520 10) W0,179,318
Count'Spalmtion DISWCI No.2
Summery Quarterly FINNA l Report
9Monm.Eadcd MIAN
Budget Ravlow
1994-95 Remalning Yeer".Gate
�r Budget YsarNDab Budget %Expanded
Beginning Fund Balances,July 1 2M,1N,W
REVENUES:
Tex Larry(Bond Fund(.)Only) 0 0 0 0,00%
Tax Alloca0onstSubventions(Sham or l%) 9.516,N0 5,101,101 4,333,909 54.45%
Fodornl sad Stare C.nayuction Grants 0 0 0 0.00%
Connection Fens 2,60,ON 2.03,431 155,549 N.02%
Omer Face =,ass.= 41,00.731 CN0,= 61.85%
Sale of Capacity Rights 110.Wo 4,310,2N (4,202,240) 37N.62%
Internal S Misc.Receipts 9,N1,000 4,672,041 5.288,969 49.90%
Other 0 0 0 0.0094
Total Rev..... 44,030,0110 30,611,510 14,212,430 68.30%
Total RNonuo 8 Beginning Balances 2N,7KEIS
EXPENDITURES:
Sham of Jolnl Works TnnL Plant S Reserves N,701,000 5,314AM 51,388,316 9.37%
Mail Think Sewer Coney.B Reserves 3,650,000 2,09,T70 990.230 72.07%
COPIBood Retirement and Internet Expense 28.952.000 4,805.118 22.01141.11" 18.05%
Sham of Joint Wells;Opomting Expenses 18,21110W 1I'"s,3N 512215N 57SM
Provided for Reimbursement Agreements 0 0 0 0.00%
Diablo Operating It Other Expenditures 2,225,000 1,400,382 7N.638 66.98%
Tmal Expus datums 105,H8,000 25.370,282 80,420,718 23.90%
Ending Fund Balances 231,366,234
Facilities Expansion
Balance Adjustments Tmnaferto Balance
71154 ItAdditions Fixed AeeeM1 31NM0
CONSTRUCTION PROGRESS:
2.1"R2 SARI Manhole 1,680 20.394 22,054
2-TA Atwood Subtmnk Q 91157 Interchange 0 1512 1.512
248 Olive Songful B SAR Creating.for SA.Widening 0 11p49 11.3411
Pump Sins U.P.S.Addn. 0 3,967 (3,987) 0
24-1 Lincoln lnmrmini Sawa, 20 28
246 Sewer Encasements for AT S SF Commuter Rall 4,997 8.651 13.848
2-5.2 Orange S Olive Subyunk 2,931 2.931
242 Sawpa Trunk Line Diversion Gels S Monitoring Sys. IN (IN) 0
241 SARI Relief Sower 63.635 Be (63.619) (0)
2.941 Cypress Ave.Subyunk Sawar Rehab. 322,804 2.611.027 2,934,431
Misc Chas to Closed Work Orders 9.258 (5R00) 3,9N
245 Euclid Trunk S interceptor 721 7,445 6,167
Sub-Total 406,038 2,089,770 167,690) 2,999,1111
Sham of Joint Works 14.155,699 5,314,51M 11Ie1]10) 10.108,672
Sub-Total 14.155,699 41,314,604 (1,361.710) 18,108.672
COMPLETED PROPERTY PLANT 5 EQUIP,
Land and Property Rights 517,6N 517.694
Collection Lines and Pump Strta. 93 692,3 17 104 93.692421
Trnrtmant FacllWo, 0 0
Disposal Facilties 33,172 33.172
General Plant and Admis.Fact. 211,453 3,967 215,420
\,x,P/ Equity In Joint Treatment FACll. 205,314,717 (312.855) 11e1110 206,363,92
OtherAeaeta at Oast Lea.Amer, 29,715 (2e.76) 63619 63,598
Total Property Plant B Equip. 314,360,905 7,631,063 (0) 321,992,667
County Satura0on District No.3
Summary Quarterly Financial Repo"
9 Months Ended"11M
Budget Review
1994.95 Remaining Yeart aw
Budget Yearto-Dats Budget %Expanded
Beginning Fund Balancer,July 1 218,8111,689
REVENUES:
Tax Les,(Bond Fun0(s)Only) 0 0 0 0.00%
Tax Alluradoml5utemntmns(Share of 1%) 10,815,e00 5.911.010 4,703.990 55.6914
Federal and Slate Construction Grants 0 0 0 0.00%
Connection Fee. 1,410,CDD 1554534 (1a4,53q 110.26%
Omar Face 22,120,000 13.431.099 8,688,901 60.72%
Sale of Capacity Rights tEL000 4,563,411 (4.440.411) 3710.0054
Interest S Misc.Receipts 10.211.000 4,700.908 6.510.082 48.04%
Met 3.223.000 0 1233.000 0.00%
Total Revenues 42,762,000 30,160.962 17,591,038 0.10%
Total Revenue&Beginning Balances 249,044,651
EXPENDITURES:
She.01 Joint Works Trmt Plant&Reae"as 55.513.000 5,616,430 50.1015'"a 10.06%
District Trunk Sewer Cohen.&Reserves IAV.000 926.113 497.897 85.11%
COP/Bond Retirement and Interest Expense 20.082,OOD 4.504.082 16.357,913 loss%
Sham of Joint Works Operating Expenses 15,140.000 10,548,005 4.800,995 6963%
Provided for Reimbursement Agreements 0 0 0 0,00%
District C'esung&me,Expenclluna 2.512AG0 1,590,9s9 921.051 6333%
Total Expenditures 96,783,000 2;188584 75,574A16 23.48%
Ending Fund Balances 225,856,067
Facilities Expansion
Bad.... Adjustments Tnmbuto Balance
211194 &Additions Fixed AraaU 31311115
CONSTRUCTION IN PROGRESS:
3-24-2 Lampoon Interceptor sewer 10291 (10,291) 0
GSS OrBnge11ftewnt SAbTnmk Rellel Sewer SS537 72 56,609
11-17 Slater PIS Upgrade.3&11 582.225 PT4,355 856.650
346 TesMle Pipe Replacement 348.502 328.202 6".204
3C6R Reel.WesVninster Ave.Force Mains 141544 54801 199,445
3.3765 Widening Pmled 7.822 WE 0,IR
348 Millor-Holder Tmnk Sewer lmymvemenls 71200 242.541 313.741
Y38-2 lmpmv.to Mlllertlolder Truck Sewer 0 17,840 17,840
3.39 Miller-Holder Easement 0 4,488 4406
Pump Ships.UPS.Aden. 0 1,983 (1,983) 0
Miscellaneous Charges W Closed W.O. 21 1.025 (5) 1,044
Sub-Total 1.218.362 928,113 (12,278) 2.135,197
Shanof JOlnt World 15.0a9.300 5.616.430 (1.438,023) 19,222,107
SYI4TOtal 15.049,700 5,616,40 (1,439,023) 19227,102
COMPLETED PROPERTY PLANT A EQUIP'
LSnd and Pmpelly Rights 280.231 290,231
Collection Lines and Pump SMs. 62.059.623 10295 62,069.818
Treatment Facilities 9.922 9,922
Disposal Facilities 29.419 28 o19
Geneni Plant and Admin.Face, 316,008 1,983 317.991
Equity In Joint Treatment Face. 215,002,228 (330,618) 1.439.023 216,110,633
Other Assets at Cost LOSS AMOM 1.405 (1,406) 0
Total PmpMly Plant&Equip, 293,965,798 15,213,520 10) 300,179.310
Cavfny SanOaOon Dis O No.5
Summary MoveNy FfnancLLl Report
9 Momhs Ended"INS
BYE9etflevlew
1994.95 Remaining Yesrlo-Dals
Budget Ya.rM vrte Budget %Expanded
%sessy
Beginning Fund Baances,July 1 "M.649
REVENUES:
Tax Levy(Bond Fuml Only) 0 0 0 0.00%
Tax AllocitiomlSubventimu(Sham of l%) 8415.000 1,36g516 1,051.4U 5646%
Federal and State Construcllon GranLL 0 0 0 0.00%
Connection Fees O7.000 70,548 (32,548) 18925%
Other Face 2759.OW 1,81SM 1.140723 5065%
Sale of Capacity Rights 14.= S10,TJ5 (496,M) 364839%
lateral d Mbc.Receipts 2,306,000 adi 1497,608 3506%
Me, 3,814.000 T46,903 3.067.197 0.00%
Total Revenues 11AM.M 8,127A11 6,227,659 45.15%
Total Revenue d Beginning Balances 69JNS,960
1XaENDf1URES:
Share of Joint Works Trent Plant B Reserves 6,554.0W 625636 5935.362 950%
District Trunk Sewer Canso.d Reserves SSLOD0 89,3M 764,694 831%
COPIBond Retimment and Interest Expense 3.M.Ob0 Btl,= 3,O78.798 2146%
Sham of Joint Works Oparsting Expenses I'sNo00 1.M.Im 470,810 23.84%
Provided for Reimbursement Agreements loni' 0 0 109,ON 0.00%
District Operating S Other Expenditures T92,000 479,245 312755 60.51%
Total ExpendRums 14A19A00 3,36TASI 10,671,419 23.88%
Ending Fund Balances 86,11"M
Fatleties Expansion
less,' Bstance Adjustments Tmnsferto BiY11ea
?MM &Additional Fixed Ms." mm
CONSTRUCTION IN PROGRESS:
5O3 Bay Bridge Ply limn. 30B.069 35,148 (SI2.rl) BIG
her.ElecMul Service @ Lido PIS IN IN
S35 So.Coast Trunk Sewer4ncl Phases ld 2 2217.173 (276.73) 1,940,400
536 Crystal Cove PIS 141.5% 143,36D M'919
534 Bayelda Dr.Trunk Sewer Iri Phase 1,2d 3 503 (503) 0
Sao Co,Del Mar PIS 8,427 8.427
IJda PIS 02 MSP Upgrade 25,670 25.670
Pump Sens.U.P.S.Adds. 0 5950 (5.950) 0
Miscellaneous Charge to Classic!W.O. 1,346 (108) 1150
d31 Coast 11191bway Force Main Replacement 5 d 6 SAM 5.1%
532 Bidder Pt d Rocky Pt PIS lmpmv.5 d 6 251 2,169 2.420
5373d4 PCH Gmviry Swr Rehab 5 d 6 1,868.000 1561266 (1,806A60) 20.000
539 Siphon 5 d 6 695,190 60.180
Pump Sine U.P.S.ANA 0 1.1104 (1,s641 0
SY4TcUI 5,072,833 88AM (2,156,165) 2,90i
Sham of Je nl Wods 1,T22.792 82SBM (161,067) 2.190.367
Sub-Total 1,722,799 628AM (161,66T) 2,1911
COMPLETED PROPERTY P1A0IT d EWM
Land and Property Rights 69,740 69,740
Collection line and Pump Stns. 30,nl.W 2,148.331 SA919,875
Tmabnent Facilities 7,347 T'MT
Disposal Facllme 7.115 7.115
,,al General Plantand Admin.Facll. 31965 7,437 39.402
ERUMy In Joint Trinomial Fadll. 24.002.679 (37.005) 161957 25.008.741
Other Assets at Cost Less AMOM 46,025 (21.012) M013
Total PropeM Plant d Equip. 62,611,845 639,926 (397) 63,251,374
County Sandwich Dial Ad.6
Summary GwTxHY Financier Report
9 Months Ended"I95
Budget Revises
1994-95 Remaining Year-t".m
Budget Year lhte Budget %Expanded t j
Beginning Fund Balances,July 1 34,677,719 `'►'
REVENUES:
Tex Levy(Bond Fund(s)Only) 0 0 0 0.00%
Tax AllocaOonsZubven0ons(Share of l%) 1225000 685.Ha 559,556 54.32%
Federal and State Construction Greme 0 0 0 0=A
Connection Fees 47,000 30.662 16.310 6528%
Other Face 3,385000 2.195.262 1,169,730 6524%
Sale of Capacity Rights 19.000 723,341 (704.841) 380989%
Internet L Misc.Receipts 1939,000 T02150 876,842 46.WA
Other 2,115,000 0 2.115.000 0.WA
Total Revenues 8,410,000 4.377.3117 4.032,613 52.05%
Total Revenue&Beginning Balances 39,266,106
ENPENORURES:
Share of Joint Works T=L Plant 6 Reserves 9,712.000 M,870 8.821.130 9.17%
Dlstrit Trunk$ewer Candor.&Reserves 681,000 753,9TT (22.977) 11072%
COP/Bond RMlrement and Interest Expense 3.089,000 563200 2,525,600 1823%
Share of Join Works 0,.Ung Expenses 2.30100 1,583,M8 753.552 6701%
Provided for Relmbunoment Agreements 0 0 0 0.a0A
District Operating&Other Expenditures 208,000 116,1w 169,BBa 40.016
Total Expenditures 16,109,000 3.911.01 12,197,359 2418%
Ending Fund Balances 35,343,475
Facilities Expansion
Balance Adiustmenb TANlerto Balance
7I1I941 &Additlons Fixed Assets 3nini
CONSTRUCTION is PROGRESS:
MI...Chg.to Creature!Work Order (32,892) (32,892)
141-1 A&B Gisler Int.ta-i-2 Baker Street 270,916 697,724 978640
6.12 FalmeW Relief 248576 248$76
6.13 Air Base Sewers Abandonment 13.667 15699 29,366
Pump SO.U.P.S.Addo 0 99 (99) 0
5.31 Coast Highway Force Main Replacement 5&6 366 366
542 Bitter Pf&Rocky Pt PIS Improv.5&e 92 789 0et
S374184 PCH Gravity S.Rehab S&6 417.000 39,587 (451,515) 5,052
5-39 Siphon 5&6 36,589 W.589
Pump SW U.P.S.Addn 0 99 (99) g
Sub-Total 962,310 7S3,977 101,713) 1264,576
Share of Joint Works 2,409,123 890.670 (228,256) 3,071>37
Sub-Total 2,409,123 890,870 (226.2%) 3.071,737
COMPLETED PROPERTY.PLANT&EQUIP,
Land and Prop un,Rights 562 562
Collection lines and!Pump Seta. 2.071.9B7 450.938 2,822925
Treatment Facilities 2,653 2,553
Disposal Facilities 7,3941 T,394
General Plant and Admin.Facil. 0,421 1172 94593
Equity In Joint Treatment Facll. 33,373,636 (52p41) 2211256 33.549652
Other Assets at Cost Less Amon 23.245 (10.675) 12,570
Total Property Plant&Equip. b,2"A37 1.661,729 397 0,826,6663 �'
CoumY Snieam aleukl No.,
- sunmar]w,11.MF,nM AlRepwl
B Yanms EnOetlNNf
.. Wedged.
1 19N.95 Remaining Y..I Oaa
Bw1a. YealgOab E.d.. %Eape...d
BspinnNO Fund Balexn,Jury 1 BgM6A59
REVENUE':
Tae Ley(Bpnd Fund(e)Onyl 0 0 0 O.W%
Tat AlbcatlonNSubvenelOne(Sbara At 1%) O.YJO.OaO 1.115.942 1414.KO 5311%
Faend and Sub Commucaon Ennis a a B BW%
Ccnmx tl.n Fees MAIN MZ&AIM (egOYR, 9 e76.76%
OMer F. 5== 35110.]19 2. lL W.52%
Saleal Caxeclty RlBnb MEN, MOMS 1,01A154 ]612.72%
Inbml S Mbc.Reulpu 3AS6,0p0 Ip443R 2,210.410 42.69%
Ober 0 0 0 O.W%
TOY,Revenues 1],]6;000 0,122,L6 a,101,W fi9.10%
Tool Revenue 5 Baginn,ng Balances H,!] 3
IXVENOIIORES'
Sher aI J01n1 I.Tmt Plant S Reserves I7,659,00O 1MA.062 ID]SIAJO 7.99%
Ceti Trunk Scorer Comer.S Rmervm 3MEN 19203W 1.111G.T36 W.02%
LOP/Bond Retinm And lnlenat Espana Ew= 957,20 I.YSpi 1719%
Sbsn a1 J01nI Worts Operating Espeneea 0261,00C) 3.021.M 1=612 7091%
P..forR inelp amen A9nemenb a 0 0 000%
OI.M.Oman"A Men Expenditure I.M.WO 1m1A05 MASS SON%
TAW Eapamu uru ]2.t!],WO 62W.Aa ]],W,1r 26AM
Enema Fund Babncea glAn'3x
Facil.-Etpambn
Balance Adj.... TrensMb Bslsn[e
VIM SAdd'Ndns FbndAueb =1%
CON52RIXTIMINPROORE25:
\ / ]-23 parallel B Wed.Lemon HelgMa ea.050 126,205 MASS
�I 2.2 l Colle,Ave.Pump Slut Rpl FOme Wine IOAST 2a36 taW2
Pump Ste LLPS.Addn 0 5,051 (sAl 0
24.1 Man 5t P51mpnn 21.033 BAW IDMO
-1.Orange Pen;Auer Saver Sup, IM.117 33 MM
7A9 Coeln HNgbtl Sever Se.T98 539 SSAS
Man.AdlisMenY Re.Ompe Cuunv 3W 209
1NAA S 0(3NNr III,141.2 B.k.151nu
Forte WM Omencn 5,261a 496,367 "SESJ5 2. 6N2
T-114.;3 Ap]ndonment and Wall.al P5 I.S00 IAAN
Saar Neu Easement Index Boatr 13YY 13YJ0
2-14 AWMon 9 PIS,TAN 62 213.M 24300 MJ s
7811 Sunflower Int 10.992 16.992
TA6 Lemon Helg0ta Saver ST,OB2 W 57.172
Will Saeet Flume Ladd, M I3W) 0
7-1-1 GiOeaRedM,l Tort AbeMammam 2ffi 126 2A59
Tcbtle Pipe Repbcemene W]A 00,T11 162.950
TdO Nay Way PA AbeMonmene NOT Sri M,Ml) 23fi
T-17 Orange PA.A..Seven RepL 13.M 21}76 SE160
Win level Flume Fbwmebe 'ASS, (1559) 0
MMulbnaeus Cbamas b Closed WA. all IS 626
Sub.Tou, 1.3Wj11 1AIIIA6a (qa]t) 3,032,746
Slurs of Jalnl Wone 3. 7211 1.35B.OB2 (NT.aMO 1.592,3ca
Sub-Teal ]Al1jL 1}66AR MT,W) eA92.W
undeM Pm,dy Rights I.SA.BOI 1.5NS61
ColecOon Lines and Pump Sbs. 34.011 90.190 36,162,a4KI
Tmadnent FacaiOes It 0
Mepdsel Facl„Ns 10.782 10182
Genera,Plant and Admin.Facil. M248 5.651 93W9
Epulty N Jolnl Tnalmee FaclL 5116B145 Q962fi1 P7,4,t6 51 A.1.
OIMrAeaeb el Coel Lee.A meM1 I?HO 111]961 1340
TOal PmMM Plant a Equip. 93,67a,019 ......301 0 96,B6T,]2l
County Sanitation District No.11
Summery Constantly Financial Report
9 Monma Ended"195
Budget Review
199e-95 Remaining Yeari xfte
Budget YeartcJate Budget %Expanded
Beginning Fund Balances,Jury 1 58,941,075
REVENUES:
Tax Levy(Bond Fund(s)Only) 17,000 10.200 e.300 62.91%
Tax AllocationslSubventione)Share of l%) 2.0e1000 1.ta37Z2 SINIX8 55.991K,
Federal and Slate Construction G rams 0 0 0 0.0096
Connection Fees 116.000 118,560 (SBB) 100A0%
Other Face 3,172.000 1B40,320 1,231,630 GIAM
Sale of Capacity Rights 23.000 on.075 (1154.0751 3613.37%
Interest 6 Misc.Recombs 2.U5000 1,074,306 1.270,814 45.82%
Clear 29e000 9 29e,000 0.00%
Total Revenues 8,010,000 5,163,021 2,ee6,179 61.47%
Total Revenue 6 Beginning Balances 64104,898
EXPENDITURES:
Share of Joint Wodu Trmt Plant 6 Reserves 12.098,000 1.079.461 11.018.09 8.92%
District Trunk Sawor Censer.6 Roservea 4.160.000 1,e20.242 t602,750 3532%
COPIBond Retirement and Interest Expaese e,299.000 839.578 3A59,e22 1953%
Sham of Joint VI Operating Expanses 3.0e7,00D 2,342,228 704,p22 76.87%
Provided for Relmbunamont Agreements 0 0 0 0CV/.
D"d Operating B Other Expenditures 812,OOD e31.367 410.633 51.23%
Total Expenditures 2e,009,000 6,16;676 18,286,124 25.21%
Ending Fund Balances 66,Won
Fa.IIMGa Expansion
Balance Adjustments Transport. B6yflg9
711M BAddlke. Fixed Aeseb Mims
CONSTRUCTION IN PROGRESS:
11-104R Valve Repair@Slater AVM.PIS 187 (187) 0
11.17 Sister PIS Sewage Sys be prov. 2.706,902 1,488,118 4.175.10)
Miscellaneous;Charge to Closed W.O. 0 580 580
J-2e&J-2dA Flowmelera 252 (252) 0
Pump Sina U.P.S.Anon 0 1,983 (1,983) 0
Sub Total 2.707,421 1,470,2e2 09631 6,175,6W
Share of Joint Wort 2.IW,567 1,OT9.N1 (276.576) 0,867.433
Sub-Total 2,88e,5e7 11029,e61 W6,5116) 3,11117A2
COMPLETED PROPERTY PLANT 6 EQWP:
Land and Property Rights 146.986 1a8.986
Co lection Linn and Pump Suns. 19.0e6502 ISMS 602
Tmalment FacllWas 0 0
Olepasal FacIIWBs 3053 3.053
General Plant and Admin.Facil. 28.699 1.983 30682
Equity In Joint Treatment Facll. 40.491013 (63,5e2) 226.576 40J04,0e6
Other Assets at Cesl Leas Anent 0 0
Total Property Plant&Equip. 65,310,321 2,e86,161 0 67,796,ee2
County Saeha0on Disolcf No.13
Summary Ouirri Financial Report
P MomAa Enloe Y11M
Bud at Review
1994 95 Ramalning yenr-to-DMa
Budget year-!.-0ato Budget %EaponEnd
Beginning Fund Exercn,July 1 16,367,552
REVENUES:
Tex Las,(Bond Funci Only) 0 0 0 000%
Tax Allocedeel5uhvendns(Sham of 1%) 0 0 0 0.00%
Federel and SUM Constructed Grants D 0 0 0.00%
Connection Fees 470000 262035 207,%S 5575%
ONor Fees Billow 452765 357,235 5590%
Sale of Capacity Rights 4.000 104,261 (130.261) 335553%
Intents S Mize.Receipts 721,000 303.973 417027 42.15%
Me, D 0 0 0.00%
Total Revenues 2R05,000 1,153,0:4 851.966 57.51%
Total Revenue S Beginning Balances 17.520,586
ENPEND/NRES'
Share of Jolts Works Treat Plant S Reserves 2A68.000 105.242 2300,758 e1016
District Trunk Sewer C.naIr.B Reserves 470.000 0 470000 0.00%
COP/Bond Retransmitted Interest Expense 27,000 9503 17,497 55.2n
Share of Joint Works Operant,Expense. 504,000 U3,1$5 160.845 N,N%
Provided for Relmtum.m.nt Agmomente 0 0 0 0.00%
District Opened,SO Mar Expenditures M,o00 24,228 61,F72 2B.17%
Taal Expenditures 2,553,000 542,128 3.010,872 1518%
Ending Fund Balances 19,979,a59
Facilities Expansion
Sam. Adjustments Transfer Bound..
TItM AMdBlons Fixed Asue, JO1n5
CONSTRUC11ON IN PROGRE
Shan of Joint Wodu 430.O70 185.242 (42.336) 552,974
Su0-i.tsl s30,070 165,242 (42,338) 551,974
COMPLETED PROPERTY.PLANT It EDUIP:
Land and Property Rights 0 0
ColleNon Linea and Pump SM6. 2,482,957 2,462.957
Treatment Facllltea 0 0
Dlapoeel Faclllds 0 0
General Plant and Admire.Fade. 0 0
Equity In Joint Treatment Fadl. E040.248 (9.727) 42.338 3.072.1150
Mar"Mt,at Cost L..AmeM1 0 0
Total Property Plant S Equip. 8,933.275 155,516 0 9AM.TH
�t�
CountysamumarDletict No.14
Summery Ouarferty Flnancfel Report i
9 Monms Eaded,1GINS
Budget Review 1
19"-95 Remaining Year-to-Date !!!"
Budget ymu Dale Budget %Upendeal f
Beginning Fund Balances,July 1 67,024,03 tea•'
REVENUES:
Tax Le,(Bond Fund(s)Only) 0 0 0 0.00%
Tea Alloca0onM5utmn0ons(Sham of l%) 0 0 0 O.M
Federal and State Construction Grants 0 0 0 00016
IRWD Fees 20.400,000 92Y2,016 11,1T,9132 4521%
Other Fags 0 47,350 (47,350) 0.00%
Selo of Capac0y Rights 25.000 938.361, (913.387) 3753.47%
Interest B Misc.Receipts 559.000 377261 181,739 BTAB%
Other a 0 0 Om
Total Revenues 30,984,000 10,684,BK 10,399,004 SORB%
Total Revenue&Beginning Balances TT,608,B2B
EXPENOIFURES:
Shareot Jolnl Works TfnL Plant&Reserves 13.502,000 1,154,897 12352.103 8.55%
District Trunk Sewer Corot.&Reserves 4"1,000 4.113,758 177,242 IMAM
COP/Bond Re0remenl and Interest Expense 159,000 55,902 102,008 36.38%
Share of Joint Works Operating Expenses 1,251,000 1,041,595 209,405 B326%
Provided for Reimbursement Agreements 0 0 0 0.00%
Distinct Operating&Other Ex,rulmras 42g000 121,023 3G3,9Ty 28.48%
Total U,ndiWres 19A32,g00 6,47,175 13,144,825 30,04%
Ending Fund Balanced 71,12;554
Facilities Expansion
Bounce Adjustments Trenafer to Balance
Wiled &Additions Fixed Assets W31MS
CONSTRUCTONIN PROGRESS:
Capacity Purchase hum Districts,S&6 3,597 3,597
Main Street Flume Flowmeter 2,544 (2,544) 0
W-1 A&B Gisler ML,14.1.2 Baker SL
Force Main,Districts 6,7&14 1189,907 4.100,145 5291
Main SL Pump Station Improvements 7-0-1 81,298 13,613 ".sit
Sub-Total 1,IA,306 4,113,758 (2,544) 5,388,580
Share of Joint Wort 3.055,607 1.154,897 (285,904) 3.914.801
Sub-Total 3,055,807 1,154,092 (295,904) 3,914.001
COMPLETED PROPERTY.PLANT&EQUIP,
tend and Property Rights 0 0
Collection Lines and Pump Shia. 19,379.710 2,544 19,382,254
Treatment Facilities 0 0
Disposal Facilities 0 0
General Plant and Admin.Facll. 6.747 6.747
Equity In Joint Treatment Facil. 42240,958 (67,984) 295,904 42.468,878
Other Assets at Coat Leas Amon. 0 0
Total Property Plant&Equip. 65,960,660 5.200,672 0 71,1$1240
U
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(a): Minutes of the Executive Committee
Summary
(1 ) Receive and file draft Steering Committee Minutes for the meeting held on
April 26, 1995.
(2) Receive and file draft Ad Hoc Committee re Space Utilization Study for
Administrative Employees Minutes for the meeting held on April 28, 1995.
(3) Receive and file draft Operations, Maintenance and Technical Services
Committee Minutes for the meeting held on May 3, 1995.
(4) Receive and file draft Planning, Design and Construction Committee Minutes
for the meeting held on May 4, 1995.
(5) Receive and file draft Finance, Administration and Human Resources
Committee Minutes for the meeting held on May 10, 1995.
(6) Receive and file draft Executive Committee Minutes for the meeting held
May 17, 1995.
Summary
See attached minutes.
Recommendation
Receive and file minutes listed above.
wpdmWs1np951�S13
County Sanitation Districts
of Orange County,California
P.O.Box 8127 • 10844 Ellis Avenue
Fountain Valley,CA 92728-8127
Telephone: (714)952-2411
DRAFT
MINUTES OF THE STEERING COMMITTEE
April 26, 1995 - 5:30 p.m.
A meeting of the Steering Committee of the County Sanitation Districts Nos. 1, 2, 3, 5, 6,
7, 11, 13 and 14 of Orange County, California was held Wednesday, April 26, 1995,
at 5:30 p.m., at the Districts' Administrative office.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
STEERING COMMITTEE: OTHERS PRESENT:
Presen Thomas L. Woodruff, General Counsel
Director William Steiner
John C. Cox, Jr., Joint Chair Mike Steiner
Peer A. Swan, Vice Joint Chair
John J. Collins, Chair, PDC
Pat McGuigan, Chair, OMTS
Roger Stanton, VC Finance 8 Personnel STAFF PRESENT:
Donald F. McIntyre, General Manager
se t: Blake P. Anderson, Assistant General Manager
Michael White, Controller
George Brown, Chair, FPC Jean Tappan, Secretary
(2) APPOINTMENT OF CHAIR PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no comments by any member of the public.
(4) APPROVAL OF MINUTES
The minutes of the March 8, 1995 Steering Committee meeting were approved as
drafted.
P
Minutes of the Steering Committee Meeting
Page 2
April26, 1995
(5) REPORTS OF THE COMMITTEE CHAIR GENERAL MANAGER AND GENERAL
COUNSEL
No reports were made.
(6) STEERING COMMITTEE DISCUSSION ITEMS
(d) Concept Budget
Mike White, Controller, presented a brief overview of the draft of the newly-
developed Concept Budget. The draft will also be presented to the operating
committees at their May meetings. The final budget will be presented to the
Committees at their June meetings and to the Directors at the June 28 Joint
Board meeting for approval. After discussing the one-step budget process, time
frame, consolidation, team approach, process, level of control and amendments
(provisions for change) and assumptions, the concept was accepted.
Other items discussed were anticipated changes in staffing as a result of the
Ernst&Young report, fee increases, training, and privatizing security.
The CORF budget was presented by Finance Director Gary Streed and
discussed. The new format organizes projects by the flow through the plants.
Staff was directed to add an overview or summary statement to each of the
projects that states what is being done now, and what can be gained by doing
the project. A very preliminary budget, based on receiving all of the OCIP funds,
was presented depicting reserves and carryover, revenues, requirements,
additions to and deductions from reserves, and estimated ending reserves.
General Manager Don McIntyre indicated that the 2020 Vision should be
updated starting next year and include revised long-term investment and
reserves policies as well as changes in the capital improvements program.
(a) Staff Time and Costs for Preparation of Agenda for Committee Meetings
The General Manager discussed the issue of staff time necessary to prepare for
the operating committees and the Joint Boards meetings. While the numbers
may not be totally accurate, they indicate that the process needs revision. The
Committee decided to continue the existing process until the end of the year
Minutes of the Steering Committee Meeting
Page 3
April 26, 1995
(December) and then revisit the issue. In the meantime, staff and the
Committee will consider any recommendations put forth to streamline the
process, including merging the Districts.
(b) Management Performance Review Program (MPRP)
The General Manager asked the Committee to reconsider the MPRP, based on
the E&Y report and staffs comments. The program, as presently implemented,
is not working. More training is required and the program needs to be funded at
above the cost-of-living. After further discussion, staff was directed to
investigate alternatives and report back.
(c) Consideration of Solid Waste Management System.
The General Manager met with Bill Popejoy and Mr. Taormino of Anaheim
Disposal on the landfill system, currently managed and operated by the County
of Orange. The Districts have the authority under the Special Districts Act to
manage this system. However, all cities must agree to use the County landfills
in order to ensure revenues. At this time, the County appears to have an
inflated value placed on the landfills, and studies staff has completed show that
their value just isn't there. Staff will continue to track this issue and report back
to the Committee as events occur.
(6) CLOSED SESSION
There was no closed session.
(7) OTHER BUSINESS
No other business was discussed.
(8) MATTERS TO BE REPORTED AT A SUBSEQUENT MEETING
There were no matters to be reported.
Minutes of the Steering Committee Meeting
Page 4 ,.
April 26, 1995
(9) MATTERS ON A FUTURE AGENDA FOR ACTION AND A STAFF REPORT
There were no matters for a future agenda.
(10) CONSIDERATION OF UPCOMING MEETINGS
The next meeting will be at the call of the Joint Chair.
(11) ADJOURNMENT
The Steering Committee adjourned at approximately 7:10 p.m.
..
Submitted by:
Tappan, Steerifig Committee Secretary
�:MyCocbm�atr<omm`ma95Da]696.min
County Sanitation Districts
of Orange County, California
P.O. Box 8127.10844 Ellis Avenue
Fountain Valley, CA 92728-8127
Telephone: (714)962-2411
DRAFT
MINUTES OF AD HOC COMMITTEE
MEETING
Friday, April 28, 1995 12:00 p.m.
A meeting of the Ad Hoc Committee of the Planning, Design and Construction
Committee of the County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13, and 14 of
Orange County, California was held on Friday, April 28, 1995, at the Districts'
Administrative Office.
(1) ROLL CALL
Those present were as follows:
AD HOC COMMITTEE: STAFF PRESENT:
John Collins, PDC Committee Chair Don McIntyre, General Manager
John Cox, Joint Chair Blake Anderson, Asst. General Manager
Peer Swan, Vice Joint Chair Gary Streed, Director of Finance
Don Griffin, Past Joint Chair John Linder, Director of Engineering
(2) PUBLIC COMMENTS
There were no public comments received.
(3) APPROVAL OF MINUTES
None to report as this was the initial meeting.
Minutes of Ad Hoc Committee Meeting
Page 2
April 26, 1995
(4) NEW AND MISCELLANEOUS ITEMS
(a) A video was shown of the Plant No. 2 Warehouse and some of the utility tunnels
which are used for equipment storage. This information disputed the Ernst &
Young report regarding the need for the new Plant No. 2 Warehouse.
Existing office space was presented in the form of exhibits of as-built floor plans
and discussed with the Committee.
(b) Information was presented to the Committee, which included current and future
space requirements based on existing and projected personnel.
(c) The Committee toured the administrative support areas at Plant No. 1, which
included the Information Services offices, the old Control Center, the Human
Resources office, the offices in the Maintenance Buildings 5 and 6, the new
Control Center, and the Administration Building.
(d) The Committee directed Staff to prepare a draft scope for professional services for
a study to determine how best to utilize existing space as well as planning for
future space usage. The draft scope of work will be presented to the Ad Hoc
Committee at a future meeting.
It was also decided to move forward with the demolition of the old lab.
(5) ANNOUNCEMENT OF FUTURE MEETINGS
The next meeting of the Ad Hoc Committee will be determined at a later date.
(6) ADJOURNMENT
The meeting adjourned at 2:30 p.m.
Linda D. imenes
Ad Hoc Committee Secretary
wpdoc\adhoc95k042895.min
_ County Sanitation Districts
' of Orange County,California
P.O. Box 8127 • 10844 Ellis Avenue
Fountain Valley, CA 92728-8127
Telephone: (714)962-2411
DRAFT
MINUTES OF THE OPERATIONS, MAINTENANCE AND
TECHNICAL SERVICES COMMITTEE
WEDNESDAY, MAY 3. 1995 - 5:30 PM
A meeting of the Operations, Maintenance and Technical Services Committee of the
County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County, California
was held on May 3, 1995, at 5:30 P.M. at the Districts' Administrative offices.
(1) ROLL CALL
The roll was called and a quorum declared present as follows:
Committee Directors Present: Staff Present:
Pat McGuigan, Chair Blake Anderson, Assistant General Manager
Victor Leipzig, Vice Chair Laurie Bluestein, Lab Manager
John C. Cox, Jr., Joint Chair Gary Hasenstab, Director of Human Resources
Barry Denes Ed Hodges, Director of Maintenance
Norman Z. Eckenrode Terri Josway, Mgr of Safety/Emergency Response
James M. Ferryman Charles McGee, Lab Supervisor
Mark A. Murphy Don McIntyre, General Manager
Chris Norby Fred O'Brien, Scientist
Sal Sapien Bob Doter, Director of Operations
Gary Streed, Director of Finance
Ed Torres, Director of Technical Services
Committee Directors Absent: Others Present:
Julie Sa Eric Norby, Director Norby's Brother
Peer Swan
(2) APPOINTMENT OF CHAIRMAN PRO TEM. IF NECESSARY
No appointment was necessary.
(3) PUBLIC COMMENTS
There were no comments from the public.
Minutes of the Operations, Maintenance
and Technical Services Committee Meeting
Page 2 of 4
May 3, 1995
(4) REPORT OF THE COMMITTEE CHAIR, GENERAL MANAGER, ASSISTANT
GENERAL MANAGER OF OPERATIONS. DIRECTOR OF MAINTENANCE
AND GENERAL COUNSEL
(a) REPORT OF THE COMMITTEE CHAIR
Moira Sullivan was introduced as the new cook and meal server.
(b) REPORT OF GENERAL MANAGER
No report was given.
(c) REPORT OF ASSISTANT GENERAL MANAGER OF OPERATIONS
No report was given.
(d) REPORT OF DIRECTOR OF MAINTENANCE
Ed Hodges reported on the status of the clean-up of Plant No. 2; another
status report will be given at the June 7, 1995 Committee meeting. The
Chair asked Ed Hodges to call Peer Swan and give him the update over
the phone as he was not able to attend the meeting.
(e) REPORT OF GENERAL COUNSEL
No report was given.
(5) APPROVAL OF MINUTES OF APRIL 5. 1996
There being no corrections or amendments to the minutes of the regular meeting
held on April 5, 1995, it was moved, seconded and carried that said minutes be
deemed approved as mailed.
(6) OLD BUSINESS
OMTS95-021 Consideration for Review of the Districts' Occupational
Iniury and Near Miss Accident Rates
Terri Josway, Manager of Safety and Emergency Response, presented the first
quarterly report on the Districts' record of occupational injuries and near-miss
accidents. �✓
Minutes of the Operations, Maintenance
and Technical Services Committee Meeting
Page 3 of 4
May 3, 1995
(7) NEW BUSINESS
OMTS95-022 Conceptual Overview of the Districts' Proposed Budget
for Fiscal Year 1995/96
Don McIntyre, Blake Anderson and Gary Streed presented an overview of what
is to be proposed in the new"user friendly' 1995/96 budget. Emphasis was
placed on tightening the capital projects budget for the year, training personnel,
and embarking on the preparation of the next Master Plan. In addition, Blake
gave an update of the County's Bankruptcy situation and how it will and will not
affect the Districts.
OMTS96-023 Consideration of a Resolution amending Classification
and Compensation Resolution No. 79-20, establishing a
1995 Summer Work Program for painting, tunnel
maintenance, grounds maintenance and pump station
maintenance work at a cost of$140,000 - Ed Hodges
After some discussion, it was moved, seconded and carried to approve this item
for consideration by the Executive Committee and the Joint Boards of Directors.
OMTS95-024 Consideration of motion to award the contract for the
marine monitoring vessel for surveying coastal waters,
bid specification P-158, to Enchanter. Inc.. for the time
period July 1. 1995 through June 30, 1996, for a cost not
to exceed $100,800,with an option for up to two (2)
additional one-year renewals - Laurie Bluestein
After a brief presentation by Laurie Bluestein, Lab Manager, it was moved,
seconded and carried to approve staffs recommendations.
Staff is requested to look into the possibility of a Directors' tour on the vessel.
OMTS95-025 Consideration to: 1) authorize the Districts' participation
in the Santa Monica Bay Restoration Project (SMBRP)
epidemiological survey, 21 authorize the General
Manager to enter into a Memorandum of Understanding
(MOUI with the SMBRP and enter into a contract with the
State Water Resources Control Board (SWRCBI to
implement this MOU in order to reimburse the Districts
for an amount not to exceed $180,000 for cost
associated with labor and materials to analyze virus
.✓ samples and continue in-house efforts during this
project period through a specific term of employment
agreement 3) authorize the General Manager to enter
into a six-month specific term of employment agreement
Minutes of the Operations, Maintenance
and Technical Services Committee Meeting
Page 4 of 4
May 3, 1995
for a Laboratory Analyst at a rate not to exceed $26.00
hourly (a not-to-exceed cost of $26.000) and. 4)
authorize the General Manager to enter into additional
contracts, as necessary and with no increase in the
$180,000 authorized amount, to implement the terms of
the MOU - Laurie Bluestein
After a presentation by Laurie Bluestein, it was moved, seconded and carried to
approve staffs recommendations.
(8) CLOSED SESSION
The Chair declared there were no items for closed session.
(9) OTHER BUSINESS. IF ANY
As mentioned in Item OMTS95-024 above, staff is to look into the possibility of a
Directors' tour on the Enchanter, Inc. vessel.
Director Sapien asked what, if anything, is being done about security in view of
what happened in Oklahoma. Bob Dolan, Director of Operations, will be looking u
into contracting a security company. Gary Hasenstab, Director of Human
Resources, advised the Directors that a meeting was scheduled for May 4, 1995
with an outside security consultant.
(10) MATTERS ON WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT AT A
SUBSEQUENT MEETING
Staff is to report on the dollars spent by the Districts on the bankruptcy attorneys.
(11) MATTERS A DIRECTOR MAY WISH TO PLACE ON A FUTURE AGENDA
FOR ACTION AND A STAFF REPORT
None.
(12) CONSIDERATION OF UPCOMING MEETING DATES AND ITEMS TO BE
DISCUSSED AT THOSE MEETINGS
None.
(13) ADJOURNMENT
The Chair declared the meeting adjourned at 7:25 P.M. ,.
CM
M=PD0003101EH\OMTSWINUTES.95%5
County Sanitation Districts
"p of Orange County,California
P.O.Box 8127.108"Ellis Avenue
Fountain Valley,CA 92728-8127
Telephone: (714)962-2411
DRAFT
MINUTES OF PLANNING, DESIGN AND
CONSTRUCTION COMMITTEE
Thursday, May 4. 1995 at 5:30 p.m.
A regular meeting of the Planning, Design and Construction Committee of the County
Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13, and 14 of Orange County, California was
held on Thursday, May 4, 1995, at the Districts' Administrative Office.
(1) ROLL CALL
The roll was taken and a quorum declared present, as follows:
PLANNING. DESIGN AND OTHERS PRESENT:
CONSTRUCTION COMMITTEE: Jim Hargreaves, Lee & Ro Engineers
John Collins, PDC Committee Chair Lee Badertscher, Lee & Ro Engineers
John Cox
Shirley Dettloff
Don Griffin STAFF PRESENT:
Barry Hammond Don McIntyre, General Manager
Margie Rice Blake Anderson, Assistant General
Sheldon Singer, PDC Committee Vice Manager
Chair John Linder, Director of Engineering
Charles Sylvia Bob Ooten, Director of Operations
Jack Vincent, Planning and Design
Manager
Michael White, Controller
Chris Cevellone, Engineering Supervisor
Wendy Sevenandt, Project Manager
.,r
Minutes of Planning, Design and
Construction Committee Meeting
Page 2
May 4, 1995
(2) APPOINTMENT OF CHAIR PRO TEM
The Vice Chair was in attendance, therefore, there was no need for a Chair pro tem.
(3) PUBLIC COMMENTS
There were no public comments received.
(4) APPROVAL OF MINUTES OF April 6, 1996 MEETING
The minutes of the April 6, 1995 Planning, Design and Construction Committee were
approved as corrected. Date of next committee meeting should have shown May 4,
1995, not June 1, 1995.
(5) REPORTS OF COMMITTEE CHAIR, GENERAL MANAGER, DIRECTOR OF
ENGINEERING AND GENERAL COUNSEL
(a) REPORT OF THE COMMITTEE CHAIR
There was no report made by the Committee Chair.
(b) REPORT OF THE GENERAL MANAGER
There was no report made by the General Manager. The Assistant General
Manager gave a report on the bankruptcy. He discussed the disbursement
of 77 cents on the dollar and stated that the District should receive it around
the last week in May or the first week in June. In the period between June
5th through the 81h, if the recovery notes aren't"Good as Gold".
The Assistant General Manager stated that the Orange Investment Pool
Committee will become a part of the Creditors Committee. The Creditors
Committee is presently made up of the Orange County Retirement System
Trustees, bond holders and vendors. It was asked if individuals who had
money invested would get the same return as agencies and Blake staled
that he expected everyone to get the same monetary return of 77% cash
and 3% recovery notes.
U
Minutes of Planning, Design and
Construction Committee Meeting
Page 3
May 4, 1995
(c) REPORT OF THE DIRECTOR OF ENGINEERING
The Director of Engineering introduced Jim Hargreaves and Lee
Badertscher from Lee & Ro Engineers.
(d) REPORT OF THE GENERAL COUNSEL
There was no report made by the General Counsel.
(6) STAFF OVERVIEW OF DISTRICTS' PLANNING. DESIGN AND CONSTRUCTION
ACTIVITIES
(a) Status Report on Planning, Design and Construction Projects
The Director of Engineering discussed the April 25, 1995 bid on Contract
No. 3-36R, Replacement of the Westminster Force Main (First Unit) and
New Westside Pump Station Force Main. The low bidder was Albert W.
Davies, Inc., in the amount of$3,760,000.00. The engineer's estimate on
the job was $4,400,000.00.
(b) Status Report on Conceptual Budget re Operational and Capital Issues
The General Manager reported on the proposed budget which has many
changes. One change is the breakdown by each individual department.
It is felt that this will be a useful tool. He then introduced Mike White,
Controller, who attended in Gary Streeds absence. Mike explained the
budget process and the Capital Outlay Revolving Fund. Committee asked if
the Districts could include information on typical cost effectiveness of the
Districts, such as funds obtained from the Storage Rental Area on Districts
site.
The Assistant General Manager discussed the Capital Budget. The capital
fund is $33 million this year and is for critical items only due to the
bankruptcy. Chair Collins asked that Item 11, the presentation of the Master
Planning Report be incorporated into the discussion at this time. The
Assistant General Manager went on to discuss planning issues, in regard to
the 30 year Master Plan, project time frames, need for a second Ocean
Outfall, regional water reclamation, collection system treatment plant needs,
and new strategies for meeting those needs.
Minutes of Planning, Design and
Construction Committee Meeting `
Page 4
May 4, 1995
The issue regarding Scope of Work was addressed. The Committee had
concerns regarding the time frame of ten years to fulfill the three phases of
project studies and if there could be a cost savings if this time was
shortened. The Assistant General Manager stated that he felt that there
were issues involved including the continuance of the 50% secondary
treatment verses the possibility of a ten year continuance of the waiver for
100% secondary treatment. The Districts are meeting the EPA waiver
requirements of 50% secondary treatment at this time. Don Griffin asked
about the status of the Deep Ocean SludgeOutfall. The Assistant General
Manager said that in 1987CSDOC did a study in this regard. It was shelved
but may still be considered a viable option for future disposal of sludge,
especially due to the landfill situation. The project would be relatively low
cost and would be a major cost savings from the present disposal process.
(7) OLD BUSINESS
None to report.
(8) ACTIONS RE PUBLIC WORKS CONTRACTS
(a) Monthly Change Order Report by Director of Engineering
The Director of Engineering discussed the Monthly Change Order report on
items approved by General Manager in accordance with Resolution
No. 95-9. Chairman Collins asked the General Manager if he had any
comments on this process. The General Manager stated that he fell this
process was a step in the right direction and that he recommended
increasing the amount that the General Manager could approve to
$50,000.00. The threeChange Orders in Item (8)(b) can be approved by the
PDC Committee in accordance with Resolution 95-9. Don Griffin asked
that the status of the project be clarified for the Joint Board Meeting.
(b) Action Items
PDC95-16: Consideration of the following actions re Warehouse
Building at Plant No. 2, Job No. P2-35-2, Maintenance
Building at Plant No. 2, Job No. 132-35-3; Process Area
Fire Protection, Signage and Water Distribution System
Modifications at Plant No. 2, Job No. P2-46; and Office
Trailer Relocations at Plant Nos. 1 and 2, Specification
Nos. M-044 (Rebid) and M-044-1:
Minutes of Planning, Design and
Construction Committee Meeting
Page 5
May 4, 1995
(a) Consideration of motion to Separate Office Trailer
Relocations at Plant Nos. 1 and 2, Specification Nos.
M-044 (Rebid) from the above package to bid alone.
(b) Consideration of motion to approve plans and specifications
and any subsequent addenda, and authorize General
Manager to advertise and receive bids (tentative bid date
is June 6, 1995).
The Director of Engineering described the conditions regarding
M-044 (Rebid) in regards to the involvement with the bonding
company and the need for the job to be removed from the above
package and to bid alone.
It was moved, seconded and passed to accept staff
recommendations for approval by the Executive Committee.
PDC95-17: Consideration of motion approving Change Order No. 6 to
the plans and specifications for Priority Projects Elements of
Miscellaneous Improvements to Facilities at Plant No. 1, Job
No. PI.38.2, authorizing a net addition of $34,878.00 to the
contract with Pascal & Ludwig Engineers for five items of
additional work.
The Director of Engineering described the changes included in
Change Order No. 6.
After some discussion, It was moved, seconded and passed to
approve Change Order No. 6 to the plans and specifications
for Priority Projects Elements of Miscellaneous Improvements to
Facilities at Plant No. 1, Job No. 131-38-2, authorizing a net
addition of$34,878.00 to the contract with Pascal & Ludwig
Engineers for five items of additional work, increasing the total
contract amount to $3,392,777.00.
PDC95-18: Consideration of motion approving Change Order No. 7 to
the plans and specifications for Secondary Treatment
e.✓ Expansion at Plant No. 2, Job No. P2-42-2, authorizing a net
addition of $31,673.00 to the contract with Margate
Construction, Inc. for two items of additional work.
Minutes of Planning, Design and
Construction Committee Meeting
Page 6
May 4, 1995
It was moved, seconded and passed to approve change Order
No. 7 to the plans and specifications for Secondary Treatment
Expansion at Plant No. 2, Job No. P2-42-2, authorizing a net
addition of$31,673.00 to the contract with Margate Construction,
Inc. for two items of additional work, increasing the contract
amount to $14,405,177.00.
PDC95-19 Consideration of motion approving Change Order No. 5 to
the plans and specifications for Electrification of Pump
Drives at Reclamation Plant No. 1, Job No. P1-36.1; Security
and Landscaping Element of Miscellaneous Improvements to
Facilities at Plant No. 1, Job No. P1.38.1; Miscellaneous
Improvements to Facilities at Plant No. 1, Job No, P1-384;
and Miscellaneous Improvements to Facilities at Treatment
Plant No. 2, Job No. 132-43-3; authorizing a net addition of
$40,069.00 to the contract with Advanco Constructors, for
ten items of additional work and three items of deleted work.
.J
It was moved, seconded and passed to approve Change
Order No. 5 to the plans and specifications for Electrification of
of Pump Drives at Reclamation Plant No. 1, Job No. P1-36-1;
Security and Landscaping Element of Miscellaneous
Improvements to Facilities at Plant No. 1, Job No. P1-38-1;
Miscellaneous Improvements to Facilities at Plant No. 1,
Job No. Pt-38-4; and Miscellaneous Improvements to Facilities
at Treatment Plant No. 2, Job No. P243-3; authorizing a net
addition of$40,069.00 to the Contract with Advanco Constructors
for ten items of additional work and three items of deleted work,
increasing the contract amount to $6,195,086.00.
(9) ADDENDA TO PROFESSIONAL SERVICES AGREEMENTS
PDC95-14: Consideration of motion approving Addendum No. 2 to the
Professional Services Agreement with Lee & Ro Consulting
Engineers, Inc., re Process Area Fire Protection, Signage,
and Water Distribution System Modifications at Plant No. 1
and Plant No. 2, Job No. Pt-38-5 and Job No. P2-46,
providing for additional design services and construction
support services for an additional amount of $186,670.00,
increasing the contract amount to not to exceed $710,310.00.
Minutes of Planning, Design and
Construction Committee Meeting
Page 7
May 4, 1995
It was moved, seconded and passed that Addendum No. 2
to the Professional Services Agreement with Lee & Ro Consulting
Engineers be recommended for approval by the Executive
Committee.
PDC95-20 Consideration of motion approving Addendum No. 4, to the
Professional Services Agreement with John Carollo
Engineers re Secondary Treatment Expansion at Plant No. 1.
Job No. 1311-36, and Secondary Treatment Improvements at
Plant No. 2, Job No. P2.42, providing for additional
construction support and programming of process control
equipment and computers for an additional amount of
$750,215.00, increasing the total contract amount to not to
exceed $6,639,365.00.
It was moved, seconded and passed that Addendum No. 4 to the
Professional Services Agreement with John Carollo Engineers
be recommended for approval by the Executive Committee.
(10) NEW PROFESSIONAL SERVICES AGREEMENTS
There were no new Professional Services Agreement action items.
(11) CONSIDERATION OF NEW AND MISCELLANEOUS ITEMS
(a) Presentation by Director of Engineering re Master Planning Report.
This item was discussed under Item 6 (b).
(12) CLOSED SESSION
The Chair determined that there was no need for a Closed Session.
(13) OTHER BUSINESS, IF ANY
No other business was discussed.
Minutes of Planning, Design and `
Construction Committee Meeting
Page 8
May 4, 1995
(14) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
There were no matters discussed.
(15) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE
AGENDA FOR ACTION AND A STAFF REPORT
There were no matters discussed.
(16) NEXT MEETING
(a) Executive Committee Meeting - Wednesday, May 17, 1995 at 5:30 p.m.
(b) Joint Boards of Directors Meeting - Wednesday, May 24, 1995 at 7:30 p.m.
(c) Planning, Design and Construction Committee - Thursday, June 1, 1995 at 5:30 p.m.
(17) ADJOURNMENT
The Chair declared the meeting adjourned at 7:30 p.m.
Linda D. Himenes
PIannin , Design and Co struclion
Committee Secretary
wp<!.Ipd c95Nwy`D40695,min
County Sanitation Districts
e of Orange County,California
S P.O.Box 8127. 10844 Ellis Avenue
Fountain Valley, CA 92728 8127
Telephone: (714)962-2411
DRAFT
MINUTES OF FINANCE, ADMINISTRATION AND HUMAN RESOURCES COMMITTEE
Wednesday, May 10, 1995, 5:30 P.M.
A meeting of the Finance, Administration and Human Resources Committee of the
County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County,
California was held on May 10, 1995 at 5:30 p.m., at the Districts' Administrative offices.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
Committee Directors Present: Staff Present:
George Brown, Chairman Don McIntyre, General Manager
Jan Debay Blake Anderson, Assistant General Manager
Burnie Dunlap Gary Streed, Director of Finance
James H. Flora Gary Hasenstab, Director of Personnel
John M. Gullixson Ed Hodges, Director of Maintenance
Wally Linn Bob Doter, Director of Operations
.� Thomas Saltarelli Steve Kozak, Financial Manager
Roger R. Stanton, Vice Chairman
William G. Steiner Others Present
Peer Swan
Tom Woodruff, General Counsel
Committee Directors Absent: Kay Chandler, Chandler Liquid Asset Mgmt.
Don McClean, Robert F. Driver Co.
John C. Cox, Jr., Joint Chairman Ted Davidson, Robert F. Driver Co.
Ruthan Moomy, Callan Assoc., Inc.
(2) APPOINTMENT OF A CHAIRMAN PRO TEM
No appointment was necessary.
(3) PUBLIC COMMENTS
No comments were made.
(4) REPORTS OF THE COMMITTEE CHAIR. GENERAL MANAGER, DIRECTOR
OF FINANCE/TREASURER DIRECTOR OF HUMAN RESOURCES AND
GENERAL COUNSEL
(a) Report of the Committee Chair
m
George Brown, Chairman, had no report.
Minutes of Finance, Admin. and Human Resources Committee
Page 2
May 10, 1995
(b) Report of the General Manager
Blake Anderson, Assistant General Manager, gave a brief update on the
status of the OCIP and County Bankruptcies. He reported that the initial
77% disbursements would be made Friday, May 19, 1995, and that staff
was arranging to invest the monies immediately.
(c) Report of the Finance Director(rreasurer
Finance Director/treasurer Gary G. Streed reviewed the report included
with the agenda package and updated the Committee on the status of the
Orange County Investment Pool Portfolio and the Districts' self-managed
bank and investment accounts.
(d) Report of the Director of Human Resources
Director of Human Resources Gary Hasenslab had no report.
(5) APPROVAL OF MINUTES
It was moved, seconded and duly carried to approve the draft minutes of the
April 12. 1995, meeting of the Finance, Administration and Human Resources
Committee. .J
(6) RECONSIDERATION OF COMMITTEE HANDBOOK
Committee Chairman George Brown reminded the Committee of how useful the
handbook was and urged them to review it routinely. Director Gullixson
suggested copies be made available on computer disk.
(7) BUDGET CONCEPTS AND ASSUMPTIONS
The General Manager, Assistant General Manager, and Director of Finance
reviewed the material included in the agenda relative to the basic assumptions
and the format and content changes proposed for the 1995-96 budgets. Blake
Anderson also presented an overview of the capital improvement strategic
planning to update"2020 VISION." The Committee indicated they were pleased
with the changes and additional information.
(8) OLD BUSINESS
FPC95-14 Consideration of Motion to Receive and File Report on
Continued Monitoring of Variable Rate Certificates of
Participation (COP), and Update on Remarketing Agent
Transition
After brief discussion on this item, it was moved, seconded and duly carried to
receive and file staffs report.
Minutes of Finance, Admin. and Human Resources Committee
wM Page 3
v May 10, 1995
FPC95-16 Consideration of Motion to Approve Final Draft Investment
Policy Statement Prepared by Investment Advisor Chandler
Liquid Asset Management. Inc., and Callan Associates
After discussion on this item, it was moved, seconded and duly carried to
recommend approval of the final Investment Policy Statement prepared by
Investment Advisor Chandler Liquid Asset Management, Inc., and Callan
Associates.
(9) NEW BUSINESS
FAHR95-24 Consideration of Motion Extending Early Retirement Incentive
Program Provisions for all Eligible Districts' Employees
After discussion on this matter, it was moved, seconded and duly carried to
recommend approval of staffs recommendation to:
1. Support a Board Resolution adopting the provisions of Government Code
Section 31641.04 authorizing all eligible Districts' employees to receive two
years additional service credit for retirement purposes.
2. Specify that provisions of the Early Retirement Incentive Program would be
effective May 1 through June 30, 1995, and that the total cost savings of
positions filled at a lower level shall exceed the total actuarial cost of the
additional service credit granted and associated paid leave payoff costs.
Specify, for reasons of equity, that individuals retiring subsequent to March
1, 1995, who were not entitled to the previous retirement incentive, be
credited with two additional years of service, in accordance with this
program.
3. For a period of five years, or until such time as the full actuarially determined
cost is paid to OCERS, the Districts' Controller will conduct an annual post-
audit to verify that the savings exceed the actuarial and associated costs
attributable to the additional service credit, and report the findings of that
audit to the Finance, Administration and Human Resources Committee.
FAHR95-25 Consideration of Resolution Pertaining to Classification.
Compensation. and Other Terms. Conditions. Rules and
Regulations of Employment
After discussion on this matter, it was moved, seconded and duly carried to
recommend approval of staffs recommendation to:
Minutes of Finance, Admin. and Human Resources Committee
Page 4
May 10, 1995 n
1. Adopt Resolution 95-_ consolidating existing "Personnel
Resolutions,' on the basis that there are no substantial changes in the
level or cost of entitlements over previously adopted resolutions;
2. Amend Resolution 95-_ in its entirety in future Board actions in order
to preserve the continuity and completeness of the resolution.
FAHR95-26 Consideration of Motion to Select Alternatives for Renewal of
All-Risk Insurance (including Fire. Flood and Earthquake
Coverage)for FY 1995-96
After discussion on this matter, it was moved, seconded and duly carried to
recommend approval of staffs recommendation to maintain existing coverage
levels at a premium similar to last year.
FAHR95-27 Consideration of Motion to Approve and File Joint Works
Budget Reviews Prepared by Staff for the Quarter Ended March
31, 1995
After discussion on this matter, it was moved, seconded and duly carried to approve
staffs recommendation approve and file staffs report. Summary reports will be
considered by the Joint Boards at their May meeting.
FAHR95-28 Consideration of Motion to Receive and File Quarterly Staff
Summary Report of Training and Travel Costs for the Quarter
Ended March 31, 1995, and to Add Language to the Districts'
Travel and Training Policy
After discussion on this matter, it was moved, seconded and duly carried to receive
and file staffs report, and to amend the Travel and Training Policy.
FAHR95-29 Consideration of External Money Manager Selection
After discussion on this matter, it was moved, seconded and duly carried to
recommend approval of staffs recommendation to appoint a Money Manager
Selection Subcommittee to interview the eight candidates on the Callan Associates,
Inc., short-list, and return to the Committee's June meeting with a recommendation.
The Committee will include Chairman Brown and Directors Dunlap, Steiner and
Swan.
Minutes of Finance, Admin. and Human Resources Committee
Page 5
May 10. 1995
(10) CLOSED SESSION
The Chairman convened the Committee Meeting in closed session to consider
matters of pending or potential litigation, or personnel matters, pursuant to
Government Code Sections 54956.9, 54957 or 54957.6.
Reports relating to (a) purchase and sale of real property; (b) matters of pending or
potential litigation; (c) employment actions or negotiations with employee
representatives; or which are exempt from public disclosure under the California
Public Records Act, may be reviewed by the Committee during a permitted closed
session and are not available for public inspection. At such time as final actions are
taken by the Committee on any of these subjects, the minutes will reflect all
required disclosures of information.
(11) OTHER BUSINESS, IF ANY
None.
(12) MATTERS WHICH A DIRECTOR WOULD LIKE STAFF TO REPORT ON AT A
SUBSEQUENT MEETING
None.
(13) MATTERS WHICH A DIRECTOR MAY WISH TO PLACE ON A FUTURE
AGENDA FOR ACTION AND A STAFF REPORT
None.
(14) CONSIDERATION OF UPCOMING MEETING DATES AND ITEMS TO BE
DISCUSSED AT THOSE MEETINGS
Committee Chairman George Brown requested the Committee refer to the calendar
of future meetings on the back of the Notice of Meeting and reminded the Directors
that the next Committee meeting is scheduled for Wednesday, June 14, 1995. He
recommended the Committee also review the list of future meeting topics.
The Committee will not meet in August, November and December 1995 as no
Executive Committee meetings are scheduled, and no FAHR Committee
recommendation could be carried to the respective Joint Board meetings.
(15) ADJOURNMENT
The meeting was adjourned at 8:00 p.m.
"d GGS:lc
JiW� G�NLRE5KFPC M
V
County Sanitation Districts
of Orange County,California
P.O. Box 8127 • 10844 Ellis Avenue
Fountain Valley, CA 92728-8127
Draft Telephone: (714)962-2411
MINUTES OF THE EXECUTIVE COMMITTEE
May 17, 1995 - 5:30 P.M.
A meeting of the Executive Committee of the County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7,
11, 13 and 14 of Orange County, California was held on Wednesday, May 1T, 1995, at
5:30 p.m., at the Districts' Administrative offices.
(1) ROLL CALL
The roll was called and a quorum declared present, as follows:
EXECUTIVE COMMITTEE: OTHERS PRESENT:
Present: Director George Brown, FAHR Chair
Thomas L. Woodruff, General Counsel
Peer A. Swan Vice Joint Chair
Pat McGuigan Chair, District 1 and
OMITS Chair STAFF PRESENT:
John J. Collins Chair, District 2 and
PDC Chair Dan McIntyre, General Manager
Sal A. Sapien Chair, District 3 Blake Anderson, Assistant General Manager
Jan Debay Chair, District 5 Gary Hasenstab, Director of Personnel
Barry Hammond Chair, District 7 Ed Hodges, Director of Maintenance
Victor Leipzig Chair, District 11 John Linder, Director of Engineering
Thomas Sallarelli Chair, District 14 Bob Dolan, Director of Operations
Roger Stanton County Supervisor Ed Torres, Director of Technical Services
William Steiner County Supervisor Gary Streed, Director of Finance
Don R. Griffin Past Joint Chair Laurie Bluestein, Environmental Sciences
Laboratory Manager
Absent:
John C. Cox Joint Chair
(2) APPOINTMENT OF CHAIR PRO TEM
Appointment was made of the Vice Chair, Peer Swan, to be Chair Pro Tem.
(3) PUBLIC COMMENTS
There were no comments by any member of the public.
v
Minutes of the Executive Committee
Page 2 of 6
May 17, 1995
(4) APPROVAL OF MINUTES
The minutes of the April 19, 1995, Executive Committee meeting were approved as drafted.
(5) REPORTS OF THE COMMITTEE CHAIR, GENERAL MANAGER, AND GENERAL
COUNSEL
(a) REPORT OF THE COMMITTEE CHAIR
I The Chair Pro Tern discussed the letter sent to all members of the Committee from
Kinetic Labs, Inc. and referred the letter back to the General Manager for
discussion at the Committee meeting of June 21, 1995.
A. Would like to discuss, as a policy item, the size of a contract and the need for
discussion by the Boards of Directors before rejection.
B. Would like to General Manager assemble a panel of independent people to
review the items of the letter regarding procedures and have them issue a
report back to the Board members.
II The Chair Pro Tem asked the staff what would be done with the check from Orange
County on Friday. The current plan is to put the bulk of the funds in a 30-day
treasury account at 5.72%. A discussion ensued of different options that might be
considered.
(b) REPORT OF THE GENERAL MANAGER
I The General Manager reported the need for ongoing review of the Consolidation
Study, especially in the light of the fragile position of management if some Districts
choose Option B of the bankruptcy settlement. This topic will be on the Agenda for
the June 21 meeting with staffs recommendations.
II Items PDC95-17, PDC95-18 and PDC95-19 are not appropriate for the Agenda as
they fall under the $50,000 limit requiring Board action.
(c) REPORT OF GENERAL COUNSEL
General Counsel opted to report in closed session.
(6) STEERING COMMITTEE MEETING
(a) A motion was made, seconded and duly carried to receive draft minutes of the
Steering Committee meeting held April 26, 1995.
Minutes of the Executive Committee
Page 3 of 6
May 17, 1995
(7) AD HOC COMMITTEE MEETING
(a) A motion was made, seconded and duly carried to receive draft minutes of the
April 28, 1995 meeting of the Ad Hoc Committee re Space Utilization Study for
Districts' Administrative Employees.
(8) OPERATIONS. MAINTENANCE AND TECHNICAL SERVICES COMMITTEE
MEETING
(a) After some discussion of OMTS95-025, a motion was made, seconded and duly
carried to recommend approval of the draft minutes of the Operations, Maintenance
and Technical Services Committee meeting held May 3, 1995 and the following
three items:
OMTS95-023 Consideration of Motion Authorizing Establishment of a 1995 Summer Work
Program for painting, tunnel maintenance, grounds maintenance and pump
station maintenance work, at a cost of $140,000.
OMTS95-024 Consideration of Motion to Award a Contract for the Marine Monitoring
Vessel for Surveying Coastal Waters, Specification No. P-158, to Enchanter,
Inc., for the time period July 1, 1995 through June 30, 1996, for a cost not to
exceed $100,800, with an option for up to two additional one-year renewals.
OMTS95-025 Consideration of the following actions re the Santa Monica Bay Restoration
Project (SMBRP) epidemiological survey:
(1) Authorize the Districts' participation in said project,
(2) Authorize the General Manager to enter into a Memorandum of
Understanding (MOU) with the SMBRP, and enter into a contract with
the State Water Resources Control Board (SWRCB) to implement this
MOU in order to reimburse the Districts, for an amount not to exceed
$180,000 for costs associated with labor and materials to analyze virus
samples and continue in-house efforts during this project period through
a Specific Term Employment Agreement;
(3) Authorize the General Manager to enter into a six-month Specific Term
Employment Agreement for a Laboratory Analyst, at a rate not to
exceed $25.00 per hour (total not to exceed cost of $26,000); and,
(4) Authorize the General Manager to enter into additional contracts as
necessary and with no increase In the $180,000 authorized amount, to
implement the terms of the MOU.
Minutes of the Executive Committee
Page 4 of 6
May 17, 1995
(9) PLANNING DESIGN AND CONSTRUCTION COMMITTEE MEETING
(a) As previously noted, items PDC95-17, PDC95-18 and PDC95-19 were
unnecessarily added to the Agenda and do not require approval. After some
discussion of PDC95-16, a motion was made, seconded and duly carried to
recommend approval of the draft minutes of the Planning, Design and Construction
Committee meeting held May 4, 1995 and the following three items:
PDC95-16: Consideration of the following actions re Warehouse Building at Plant No. 2,
Job No. P2-35-2; Maintenance Building at Plant No. 2, Job No. P2-35-3;
Process Area Fire Protection, Signage and Water Distribution System
Modifications at Plant No. 2, Job No. P2-46; and Office Trailer Relocations at
Plants Nos. 1 and 2, Specification Nos. M-044(Rebid) and M-044-1:
(1) Consideration of motion to separate Office Trailer Relocations at Plants
Nos. 1 and 2, Specification No. M-044(Rebid), from the above package
to bid alone.
(2) Consideration of Resolution approving plans and specifications and any
subsequent addenda for Specification No. M-044(Rebid), and authorize
General Manager to advertise and received bids (tentative bid date is
June 6, 1995).
(3) Consideration of motion authorizing award of a construction contract to
lowest responsive bidder in an amount not to exceed the engineer's
estimated amount ($350,000). Should the low bid be above the
estimate, staff will seek direction from the Directors at the next Joint
Boards meeting.
PDC95-14: Consideration of motion approving Addendum No. 2 to the Professional
Services Agreement with Lee & Ro Consulting Engineers, Inc., re Process
Area Fire Protection, Signage, and Water Distribution System Modifications at
Plant No. 1 and Plant No. 2, Job No. P1-38-5 and Job No. P2-46, providing for
additional design services and construction support services for an additional
amount of$186,670, increasing the total contract amount to not to exceed
$710,310.
PDC95-20: Consideration of motion approving Addendum No. 4 to the Professional
Services Agreement with John Carollo Engineers re Secondary Treatment
Expansion at Plant No. 1, Job No. P1-36, and Secondary Treatment
Improvements at Plant No. 2, Job No. P2-42, providing for additional
construction support and programming of process control equipment and
computers for an additional amount of$750,215, increasing the total contract
amount to not to exceed $6,639,365.
f
Minutes of the Executive Committee
Page 5 of 6
May 17, 1995
(10) FINANCE ADMINISTRATION AND HUMAN RESOURCES COMMITTEE
MEETING
(a) A motion was made, seconded and duly carried to receive and file draft minutes of
the Finance, Administration and Human Resources Committee meeting held
April 12, 1995 and the following three items:
FAHR95-16 Consideration of motion approving final draft investment policy statement
prepared by Investment Advisor, Chandler Liquid Asset Management, Inc.,
and Callan Associates.
FAHR95-24 Consideration of motion extending early retirement incentive program
provisions for all eligible employees.
FAHR95-25 Consideration of resolutions pertaining to classification, compensation, and
other terms, conditions, rules and regulations of employment.
Staff will be putting together a matrix to show which groups in the organization
get these benefits.
... (11) CLOSED SESSION
(a) General Counsel reported to the Executive Committee the need for a closed session as
authorized by Government Code Sections 54956.9. 54957 and 54957.6 to discuss and
consider the item that is specified as Item No. 11(b) on the published Agenda. General
Counsel also indicated a need to add one item needing discussion and the need came
to the attention of General Counsel subsequent to the posting of the Agenda. He
reported that additional items could be added pursuant to Government Code Section
54954.2(b) upon a two-thirds vote of the Members of the Executive Committee. No
other items would be discussed or acted upon.
It was moved, seconded and duly carried that Item 11(c) be added to the Agenda to
consider a report from General Counsel in connection with the litigation entitled County
Sanitation District No. 3 v. United Technologies. at al., OCSC Case No. 722816, relative
to techite pipe.
The Executive Committee convened in closed session at 6:17 p.m., pursuant to
Government Code Sections 64956.9, 54957 and 54957.6.
Confidential Minutes of the closed session held by the Executive Committee have been
prepared in accordance with California Government Code Section 54957.2 and are
,.+ maintained by the Board Secretary in the Official Book of Confidential Minutes of Board
and Committee Closed Meetings.
Minutes of the Executive Committee
Page 6 of 6
May 17, 1995
(b) A report of action taken will be publicly reported at the time the approved action
becomes final.
(c) No action was taken.
(d) The Executive Committee reconvened in regular session at 6:29 p.m.
(12) OTHER BUSINESS
It was moved, seconded and duly carried to present the offer of settlement in the pending
action entitled County Sanitation Districts of Orange county v. Allianz Insurance Company,
Inc., OCSC Case No. 736021 to the full Joint Boards of Directors for action at their regular
meeting to be held on Wednesday, May 24, 1995.
(13) MATTERS TO BE REPORTED ON AT A SUBSEQUENT MEETING
As stated above, the Chair Pro Tem discussed the letter sent to all members of the
Committee from Kinetic Labs, Inc. and referred the letter back to the General Manager for
discussion at the Committee meeting of June 21, 1995.
(14) MATTERS ON A FUTURE AGENDA FOR ACTION AND A STAFF REPORT.
There were no matters for a future agenda.
(15) CONSIDERATION OF UPCOMING MEETING
The next Executive Committee meeting is scheduled for June 21, 1995.
(16) ADJOURNMENT
The Executive Committee adjourned at approximately 6:30 p.m.
Submitted by:
/(o-�
arice Marcin, Secretary
J:WJPD0CrA1% ECWWV9S051795.MIN
O
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
AGENDAFOR
MAY 24, 1995
ITEM 13(b)(1): (OMTS95-023) Consideration of motion authorizing a
1995 Summer Work Program for painting, tunnel
maintenance, grounds maintenance and pump station
maintenance work at a cost of $140,000.
Summary
For several years, the Directors have authorized a Summer Work Program for reducing
the backlog of painting, groundskeeping and general clean-up work around the
treatment plants and pump stations. This type of work can best be accomplished in the
summer because the weather is suitable and the temporary help (mostly students) is
..✓ more readily available during those months.
Executive Committee Recommendation
The Executive Committee recommends authorization to hire a maximum of 23 people
for the 1995 Summer Program. Also, to authorize for up to 5 temporary upgrades at a
5.5% salary rate increase for those existing full-time maintenance employees to be
designated as temporary crew leaders.
M:WPWC V 31 M H0MT$%s023.0 V R
l
COUNTY SANITATION DISTRICTS
d;
AI ORANGE COUNTY. CALIFORNIA
April25, 1995 109ARELLISAVENUE
PO BOX 8127
\✓ FOUNTAIN VALLEY,CALIFORNIA 91
7141962-2411
STAFF REPORT
OMTS95-023: Consideration of a Resolution amending Classification and
Compensation Resolution No. 79-20, establishing a 1995 Summer
Work Program for painting, tunnel maintenance, grounds
maintenance and pump station maintenance work at a cost of
$140,000.
For several years, the Directors have authorized a Summer Work Program for reducing
the backlog of painting, groundskeeping and general clean-up work around the treatment
plant facilities. Attachment'A' shows listings of typical work assignments. This type of
work can best be accomplished in the summer because the weather is suitable and the
temporary help (mostly students) is more readily available during those months.
Last year, the Boards authorized a maximum of 12 Part-time Assistant positions, working
for a flat fee of$6.00 per hour. The total cost budgeted was not to exceed $50,000.
including labor, materials and supplies.
This year we request authorization to hire a maximum of 23 people; and also request
.r authorization for up to 5 temporary upgrades at a 5.5% salary rate increase for existing
full-time maintenance employees to be designated as temporary crew leaders, as in the
past. It is proposed that the basic salary rate for the Part-time Assistants be $6.00 per
hour and the maximum expenditure for the entire program not exceed $140,000, including
labor, materials and supplies. Staff estimates that implementation of this project will save
approximately$90,000 per year.
Anticipated costs from June 9, 1995 through September 28, 1995, and crew assignments
are summarized as follows:
Salaries and wages $ 95,000.00
Materials and supplies 45,000.00
Total Slao,000.o0
Plant No. 1 Plant No. 2 Pump Stations Total
1 Warehouse Helper 5 Painters/1 Crew 4 Helpers/1 Crew 1 Warehouse Helper
5 Painters/1 Crew 4 Grounds/ 1 Crew 10 Painters/2 Crews
4 Grounds/1 Crew 8 Grounds/2 Crews
4 Helpers/1 Crew
10 Total 9 Total 4 Total 23 Total
M 1W POOCW101EH10MTZl 023.SR
ATTACHMENT 'A'
PLANT NO. 1 SUMMER PROGRAM WORK SCHEDULE
GROUNDSCREW
1. Center of Plant
a. Weed, trim, clean and spray for weeds.
2. North Side Tree Row on Ellis
a. Weed, trim, clean and spray for weeds.
3. Trees (6dt Road)
a. Weed, trim, clean and spray for weeds.
4. West Tree Row(Ward) Factory 21
a. Weed, trim, clean and spray for weeds.
..✓ 5. East Tree Row(Next to River)
a. Weed, trim, clean and spray for weeds.
`/ M:WVPDOCWI01EMbMTSV6W.SR 1
I
PLANT NO. 1 SUMMER PROGRAM WORK SCHEDULE
TUNNEL PAINT AND CLEAN-UP CREWS �../
1. Diversion Structure
a. Gate Stands
b. Piping and Equipment
2. Plant Tunnels
a. Clean
b. Paint
3. Sedimentation Basins
a. Piping and Drive Motors
b. Walkways
C. Final Basin Piping, Pumps, etc. ..�
4. Aeration Basins
a. Piping on Landing
b. Exposed Tunnel Piping
M WPD0CW10*HbMTSW5-=sR 2
0
PLANT NO. 2 SUMMER PROGRAM WORK SCHEDULE
TUNNEL PAINT AND CLEAN-UP CREWS
1. Reactor Basins and Final Basins (Paint as Needed)
a. Mixers and Piping
b. Piping, Pumps and Motors
2. Sedimentation Basins (Paint as Needed)
a. Pump Rooms
b. Piping and Pumps
3. Digesters (Paint)
a. Piping
b. Pump Rooms
4. Odor Control Equipment(Paint)
..
a. Piping, Pumps, Motors
5. Buildings
a. Clean
b. Paint as Needed
6. Tunnels
a. Clean
b. Paint Piping as Needed
M:WVPDO W10\EH10MTS\N423.SR 3
o`
PLANT NO. 2 SUMMER PROGRAM WORK SCHEDULE
GROUNDS CREWS �..✓
1. Tree Row- North End (Behind Nursery)
a. Weed, trim, clean and spray for weeds.
2. Tree Row- West Side (Brookhurst)
a. Weed, trim, clean and spray for weeds.
I Tree Row - South End (Behind Warehouse and Sample Building)
a. Weed, trim, clean and spray for weeds.
4. Tree Row - East Side (River Bed)
a. Weed, trim, clean and spray for weeds.
5. Sludge Bed Area and Truck Wash
a. Weed, trim, clean and spray for weeds.
6. Center of Plant (Basins, Digesters, Buildings, etc.)
a. Weed, trim, clean and spray for weeds.
7. Right-of-Way (To Adams)
M]WPDOCM101EH\OMTSU 23.SR 4
e
PUMP STATION SUMMER PROGRAM WORK SCHEDULE
�.J GROUNDS, PAINT AND CLEAN-UP CREW
1. Structures- Exterior
a. Clean
b. Paint, as necessary
2. Structures- Interior
a. Clean
b. Paint, as necessary
3. Grounds
a. Weed, trim, dean and spray for weeds
M:UNPO0C133101EH10MTS*"23.SR 5
9
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
May 24, 1995
Agenda Item 13(b)(2): OMTS95-02a Consideration of Resolution No. 95-
49, awarding contract for Marine Monitoring Vessel
for Surveying Coastal Waters, Specification
No. P-158, to Enchanter, Inc.for the period July 1,
1995 to June 30. 1996, for an annual amount not to
exceed $100,800.00, with provisions for two one-
year extensions.
Summary
The Districts conduct research and special projects to verify the quality of the receiving waters,
ensure the discharge does not come ashore, and to investigate the integrity of the outfall. This
work is conducted by Districts' staff on a contracted marine monitoring vessel. A bid
specification was prepared detailing the minimum requirements for this marine monitoring
vessel. The specification was advertised and sent to three companies known to perform this
work. Only one company responded.
OMTS Committee Recommendation
The OMTS Committee recommends awarding the contract for the marine monitoring vessel for
surveying coastal waters to Enchanter, Inc. for a period of one year, July 1, 1995 to June 30,
1996, at a cost not to exceed $100,800 with an option for up to two (2) additional one-year
renewals.
Executive Committee Recommendation
The Executive Committee recommends awarding the contract for the marine monitoring vessel
for surveying coastal waters to Enchanter, Inc. for a period of one year, July 1, 1995 to June 30,
1996, at a cost not to exceed $100,800 with an option for up to two (2) additional one-year
renewals.
x 1382
April n, 1995
STAFF REPORT
OMTS95-024 Consideration of motion to award the contract for the marine
monitoring vessel for surveying coastal waters, bid specification P-
158, to Enchanter, Inc. for the time period July 1, 1995 through
June 30, 1996 for a cost not to exceed $100,800 with an option for
up to two (2) additional one-year renewals.
Summary
✓ The Districts' 301 (h) modified National Pollution Discharge Elimination System
(NPDES) permit and the California Ocean Plan require the Districts to monitor Orange
County's coastal waters to ensure the protection of human health and the marine
environment. Currently, this monitoring is principally accomplished by Districts' staff
and through contracts with Science Applications International Corporation (SAIC) who
conduct all of the monitoring required by our NPDES permit. This includes: trawling; rig
fishing; benthic sampling; fish health and liver histopathology; and water quality
sampling. The water quality sampling is performed by Districts' staff who presently
have a contract with Marine Biological Consultants (MBC) to provide a vessel for that
sampling.
In addition to the NPDES mandated monitoring, the Districts, since approximately 1960,
have annually conducted research and special projects to ensure the quality of the
receiving water and the County's beaches. This work utilizes a vessel which is
contracted to the Districts. Figure 1 outlines the cost associated with this contract over
the past five fiscal years and the projected costs for the 1995/96 fiscal year.
Districts' staff feel that this additional research and special projects are necessary to
access the overall impact of the wastewater discharge to the environment by
ascertaining the spatial distribution of the plume over time.
Y
OMTS95-024
Page 2
April 17, 1995
In fiscal year 1994-95, the Districts conducted several studies which included:
• Monitoring bacteria at two offshore stations.
• Analyzing the receiving waters for the presence of pathogenic viruses and
bacteria.
• Conducting special sampling and investigations of the integrity of the ocean
outfall structure.
• Collecting marine water which serves as dilution water for the acute bioassays
conducted on three marine species to determine the toxicity of the final effluent.
In fiscal year 1995-96, the Districts are proposing to continue several of these studies
and conduct additional research and special projects to further understand the
sediment toxicity. The Districts' current contract with SAIC does not address sediment
toxicity and we believe it is important because sediment toxicity alters the species
composition of the sediment. This is important for ensuring that we are not having
a deleterious affect on the environment.
Consideration of Bids
Staff prepared a scope of work for contracting a marine monitoring vessel to assist
Districts' staff in conducting special projects and research for fiscal year 1995-96. The
minimum requirements for the vessel are provided in Table 1.
The work was advertised in the paper and bids were solicited from three companies
known to perform this work. Only one company submitted its bid due to the
requirement that the vessel be on-call 365 days-per-year, 24 hours-per-day, although
the companies were told that most work would be scheduled well in advance and only
on rare occasions would the vessel be required on short or immediate notice. This
condition has always been a requirement in our bid specifications. The requirement for
the vessel being on-call, 24 hours-per-day is to enable the Districts to respond in the
event of an unforeseen event such as a spill, after an earthquake, or a situation similar
to the recent flap gate incident. The staff feels that this requirement did not eliminate
bidders who could provide a lower cost because three years ago the only other bid was
$1,120 per day. The awarded contract for that year was for$560 per day.
OMTS95-024
Page 3
April 17, 1995
Based on the projected usage for fiscal year 1995-96, the Districts will need the
services of a vessel an estimated 12 days-per-month. The contracts' annual cost for
the work is based upon 12 days per-month. A summary of the bid is as follows:
Firm I Estimated Cost per Day Annual Cost
Enchanter, Inc. $700 1 $100,800
The Districts had contracted with Enchanter, Inc. for the last three years. Over this
period, Enchanter, Inc. did not raise its contracted costs. Enchanter, Inc. indicated it is
raising its price 25% to $700 per day (as opposed to $560 per day)for fiscal year 1995-
96 because its insurance, maintenance, slip fees, and overhead operating costs have
increased over the last three years. Staff has compared Enchanter's increased
fees and feels that they are reasonable for the services being provided.
Staff Recommendations
Based on the conclusions stated above, staff recommends awarding the contract for
a.r the marine monitoring vessel for surveying coastal waters, bid specification P-158, to
Enchanter, Inc. for a period of one year, July 1, 1995, to June 30, 1996, at a cost not to
exceed $100,800 with an option for up to two (2) additional one-year renewals.
OMTS95-024
Page 4
April 17, 1995
Figure 1
Marine Monitoring Vessel Cosis by Racal Year
T m
O S 1J0,000 ? .q a
N
$120,000
q 9
� n
o
5100,00o fi
mC
N
$80,000
560.000
$40.000
$20,000 q
S0 y' p
90/91 Costs Based on PA ea per Day X Number of Days per Month 95/96
NOTE: For fiscal year 1990-91 our contract was based on $/month subsequent
years the contract was changed to $/day.
OMTS95-024
Page 5
April 17, 1995
Table 1: Minimum Requirements of the Marine Monitoring Vessel
Insurance Vessel Skipper
Worker's Minimum U.S. Coast Guard Safety U.S. Coast Guard
Compensation Specifications Masters license
General Liability Comfortable, Safe, Stable Platform Navigational Experience
Excess Liability Precise Navigation Equipment Experience in
Environmental Monitoring
Operate within 25-Mile Radius of
Newport Harbor
On-call 365 Days-Per-Year, 24
Hours-Per-Day
x:%wpll68U1fimN800U.RP
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item 13(b)(3): OMTS95.025 Consideration of the following
actions relative to the the Santa Monica Bay
Restoration Project (SMBRP) epidemiological
survey:
(a) Consideration of motion authorizing the Districts' participation in the Santa
Monica Bay Restoration Project (SMBRP) epidemiological survey.
(b) Consideration of motion authorizing the General Manager to enter into a
Memorandum of Understanding (MOU) with SMBRP; and enter into a contract with
the State Water Resources Control Board (SWRCB)to implement said MOU and to
reimburse the Districts for an amount not to exceed $180,000.00 for costs
associated with labor and materials to analyze virus samples and continue in-
house efforts during this project period through a Specific Term Employment
Agreement, in form approved by General Counsel.
red (c) Consideration of motion authorizing the General Manager to enter into a six-
month Specific Term Employment Agreement for a Laboratory Analyst, at a rate
not to exceed $25.00 per hour(not to exceed $26,000.00).
(d) Consideration of motion authorizing the General Manager to enter into additional
contracts, as necessary, with no increase in the authorized amount of$180,000.00
to implement the terms of the MOU.
Summary
In June 1995, the Santa Monica Bay Restoration Project (SMBRP)will investigate human health
risks associated with swimming near three storm drains which Bow into the Santa Monica Bay,
The SMBRP entered into agreements with USC and UCLA to devise and perform the
epidemiological survey; Long Beach State University(LBSU) to employ six people to perform field
sampling for human intestinal (enteric)viruses; and the City of Los Angeles to perform
bacteriological analyses. The SMBRP has requested that the Districts provide facilities and staff
expertise to analyze approximately 276 samples for infectious enteric viruses. The SMBRP has
requested the Districts to enter into a Memorandum of Understanding (MOU) and other contracts
necessary to implement the MOU under which SMBRP will reimburse the Districts for all costs
related to Districts' efforts on this project. These costs include training LBSU summer
employees, assisting in constructing virus sampling units, and one-and-one-half Districts' staff
time for approximately 20 weeks. Under this agreement, the SMBRP will also fund a Laboratory
Analyst position which will be hired under a six-month specific tern of employment
agreement to perform in-house projects that would otherwise be put on hold due to
committing existing personnel to SMBRP work. The total cost of our effort for this project, which
will be reimbursed by the SMBRP, will not exceed $180,000.
OMTS Committee Recommendation
The OMTS Committee recommends the following: 1) authorizing the Districts' participation in the
SMBRP epidemiological survey, 2) authorize the General Manager to enter into a Memorandum
of Understanding (MOU)with the SMBRP and enter into a contract with the SWRCB to
implement this MOU in order to reimburse the Districts for an amount not to exceed $180,000 for
cost associated with labor and materials to analyze virus samples and continue in-house efforts
during this project period through a specific term of employment agreement, 3) authorize the
General Manager to enter into a six-month specific term of employment agreement for a
Laboratory Analyst at a rate not to exceed $25.00 hourly(a not-to-exceed cost of$26,000) and,
4) authorize the General Manager to enter into additional contracts, as necessary and with no
increase in the $180,000 authorized amount, to implement the terms of the MOU.
Executive Committee Recommendation
The Executive Committee recommends the following: 1) authorizing the Districts' participation in
the SMBRP epidemiological survey, 2) authorize the General Manager to enter into a
Memorandum of Understanding (MOU)with the SMBRP and enter into a contract with the
SWRCB to implement this MOU in order to reimburse the Districts for an amount not to exceed
$180,000 for cost associated with labor and materials to analyze virus samples and continue in-
house efforts during this project period through a specific term of employment agreement, 3)
authorize the General Manager to enter into a six-month specific term of employment agreement
for a Laboratory Analyst at a rate not to exceed $25.00 hourly(a not-to-exceed cost of$26,000)
and, 4) authorize the General Manager to enter into additional contracts, as necessary and with
no increase in the$180,000 authorized amount, to implement the terms of the MOU.
y�
I.IwPLUp4�W e9�61181.
April 17, 1995
STAFF REPORT
OMTS95-025 Consideration to: 1) authorize the Districts' participation in the
Santa Monica Bay Restoration project (SMBRP) epidemiological
survey, 2) authorize the General Manager to enter into a
Memorandum of Understanding (MOU) with the SMBRP and enter
into a contract with the State Water Resources Control Board
(SWRCB) to implement this MOU in order to reimburse the
Districts for an amount not to exceed $180,000 for costs
associated with the labor and materials to analyze virus samples,
and continue in-house efforts during this project period through
..d specific term of employment agreement, 3) authorize the General
Manager to enter into a six-month specific tens of employment
agreement for a Laboratory Analyst at a rate not to exceed $25.00
hourly (a not-to-exceed cost of$26,000) and, 4) authorize the
General Manager to enter into additional contracts, as necessary
and with no increase in the $180,000 authorized amount, to
implement the terms of the MOU.
Summary
The National Estuary Program (NEP) was established by the U.S. Congress in the
Water Quality Act of 1987 and is administered by the EPA. The purpose of the NEP
was to create a conservation and management plan which would protect and enhance
water quality in specific bodies of water. In 1988, Governor Deukmejian nominated
Santa Monica Bay to be included in the NEP; and, in July 1988, the Santa Monica Bay
became one of 21 bodies of water nationwide to be included into the program.
The Santa Monica Bay Restoration Project (SMBRP) was established under
sponsorship by the EPA, the State Water Resources Control Board (SWRCB) and the
California Environmental Protection Agency (formerly known as the State
Environmental Affairs Agency (SE4A). The SMBRP was mandated to meet the goals
OMTS95-025
Page 2 ,•,
April 17, 1995
outlined by the NEP which included development of a Comprehensive Conservation
and Management Plan (CCMP) for the Santa Monica Bay.
One of the first studies performed by the SMBRP demonstrated that urban runoff
reaching the beaches via the storm drain system contained infectious viruses from the
lower tract of humans (enteric viruses). Based on this study and a follow-up one, a
CCMP recommendation is to perform a survey of swimmers (epidemiological survey)
near flowing storm drains to determine their illness rates. The SMBRP contracted with
UCLA and USC to design the survey which was then sent out for peer review. In their
review, the California State Department of Health requested the proposed survey
include measuring human enteric viruses in the storm drain flows.
This epidemiological survey is scheduled to begin upon Boards' approval. The SMBRP
has entered into agreements with UCLA and USC to perform the epidemiological
survey, the City of Los Angeles to conduct the bacteriological testing, and Long Beach
Stale University to hire contract employees for the summer to perform field sampling
and collection of virus samples. The SMBRP has requested that the Districts assist
their effort in the following:
• train the Long Beach State University summer employees in the procedures for .►
collecting enteric virus samples;
• assist in constructing virus-sampling units; and,
• utilize the Districts' facilities, one and one-half employees to perform enteric
virus analyses on approximately 276 samples over a 20-week period.
The SMBRP requested the Districts perform this work because of: 1) the Districts'
expertise in virus sampling and analyses, 2) an existing working relationship between
the two agencies, and 3) SMBRP's budget constraints. Under the Memorandum of
Understanding (MOU) with the SMBRP and a contract with the State Water Resources
Control Board (SWRCB), the Districts' will be reimbursed for all employee time and all
materials associated with processing and analyses of the virus samples (at this time the
details of whether the SMBRP or SWRCB will reimburse the Districts has not been
finalized yet). The estimated cost for this effort is $152,485. Additionally, the SMBRP
has agreed to reimburse the Districts for six months salary for a Laboratory Analyst
position not to exceed $26,000. The analyst will perform routine Districts' work that
would have had to be put on hold by allowing the Districts' employees to work on
SMBRP samples. SMBRP's total cost reimbursement to the Districts is not to exceed
$180,000,
OMTS95-025
Page 3
April 17, 1995
Staff recommends participating in this survey for the following reasons:
• The SWRCB will closely monitor the findings of this survey in order to address
issues related to the California Ocean Plan (COP) bacteriological standards
which are currently under review.
• Districts' staff have identified 22 storm drains in our surfzone monitoring area
that influence five of the Districts' monitoring stations. Inclusion of some of the
survey's findings into the COP may result in future regulations in our own
NPDES permit which could significantly impact our staffing and equipment
needs.
• Participation in the survey will allow the Districts' staff to ensure that proper
quality assurance parameters are incorporated into the survey, and that the data
are properly interpreted.
• Participation in this survey will strengthen our relationship with the LA Regional
Water Quality Control Board, with the SWRCB, and environmental groups such
as Heal the Bay and American Oceans Campaign.
Staff Recommendation
Staff recommends the following: 1) authorizing the Districts' participation in the SMBRP
epidemiological survey, 2) authorize the General Manager to enter into a Memorandum
of Understanding (MOU) with the SMBRP and enter into a contract with the SWRCB to
implement this MOU in order to reimburse the Districts for an amount not to exceed
$180,000 for cost associated with labor and materials to analyze virus samples and
continue in-house efforts during this project period through a specific term of
employment agreement, 3) authorize the General Manager to enter into a six-month
specific term of employment agreement for a Laboratory Analyst at a rate not to exceed
$25.00 hourly (a not-to-exceed cost of $26,000) and, 4) authorize the General Manager
to enter into additional contracts, as necessary and with no increase in the $180,000
authorized amount, to implement the terms of the MOU.
k1wpltSBOVInaWOD25AP
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
U MAY 24, 1995
Agenda Item (13)(b)(4): PDC95-16 Consideration of the following actions
relative to Warehouse Building at Plant No. 2, Job
No. P2-35-2; Maintenance Building at Plant No.2,Job No. P2353; Process Area Fire
Protection, Signage and Water Distribution System Modifications at Plant No. 2, Job
No. P2-46; and Office Trailer Relocations at Plant Nos. 1 and 2, Specification
Nos. M-044(Rebid)and M-044-1:
(a) Consideration of motion to separate Office Trailer Relocations at Plants Nos. 1 and 2,
Specification No. M-044(Rebid)from the balance of the project.
(b)Consideration of Resolution No. 9550,approving plans and specifications for Office
Trailer Relocations at Plant Nos. 1 and 2, Specification No. M-044(Rebid), and authorizing
the General Manager to establish the date for receipt of bids (tentative bid date is June 6,
1995).
Summary
Sometime ago the Districts initiated an officer trailer relocation project,Specification No. M-044-1,which resulted in an
award of bid to a company named Park Rose. This project would relocate existing construction office trailers at the
Bushard Gate at Plant No.2 to a location north of the digester cleaning beds. The relocation is required to make room
for the future Maintenance Facility to be constructed at that location.
`J After receiving the bid and entering Into the contract,Park Rose defaulted on the contract by never commencing work.
The Districts,through our legal counsel,made a successful demand on Perk Rose's surety company,Frontier Pacific
Insurance Company. This resulted Ina settlement agreement which mentally required the surety company to pay the
difference between any new higher bid and the original low bid by park Rose of$199,200.
The Districts Men combined the office trailer project into a larger project involving many projects,such as the warehouse
building,process fire area protection,etc, it was the intent to go out to bid on this entire package,however,because of
the bankruptcy,this project,Including the office relocation was put on hold.
Staff recommends that the trailer relocation project now be broken out and bid separately. This matter was taken to the
PDC Committee on May 4,1995 and the committee agreed that this project should be done at this time.
This approach will also email a contract with the surety company in that much time has gone by and they have requested
a deadline by which bids are to be received. Also,the Surety is requesting the right to do the work Itself in the event that
the bids are too high. Staff has no objection to the contract agreement.
PDC Committee Recommendation
A)That the Executive Committee recommend approval to the full Board that the plans and specifications
for Specification No.M-D44 be approved,and that the General Manager advertise and receive bids for
this project
B)That the Executive Committee recommend approval to the full Board that the contract with the
Surety company be approved.
Executive Committee Recommendation
A)The Executive Committee recommends approval of the Full board that the plans and specification for
Specification No. M-044 be approved,and that the General Manager advertise and receive bide for
this project
�r B)The Executive Committee recommends approval of the full Board that the contract with the Surety
company be approved.
05-13134
I
JOINT BOARDS OF DIRECTORS
I REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(b)(5): PDC95-17 Consideration of motion approving
Change Order No. 6 to the Plans and
Specifications for Priority Projects Element of
Miscellaneous Improvements to Facilities at Plant No. 1, Job No. P1-38-2, authorizing a
net addition of$34,878.00 to the contract with Pascal & Ludwig Engineers for five items
of additional work.
Summary
Job No. P1-38-2 provides for replacement of all sluice and slide gates within the existing
Metering and Diversion Structure, new foul air scrubbers at Headworks No. 2, modifications to
existing primary sedimentation basins, and other miscellaneous facilities and work items.
Changes in the work have been required that resulted in reduced cost. A staff report is
attached which details the items included in this change order. There is no time extension
associated with this change order.
The following is a summary of the contract amount:
v Original Contract Amount $3,364,600.00
Previously Approved Changes (6,701.00)
This Change (Add) (Darr 1 ) 34,878.00
Amended Contract Amount $3,392,777.00
PDC Committee Recommendation
The PCD Committee recommends approval of Change Order No. 6 for an addition of
$34,878.00 from the contract with Pascal & Ludwig Engineers.
Executive Committee Recommendation
The Executive Committee recommends approval of Change Order No. 6 for an addition of
$34,878.00 to the contract with Pascal & Ludwig Engineers.
OS73B5
' COUNTY SANITATION DISTRICTS
.1 ORANGE COUNTY, CALIFORNIA
May 4, 1995 10SA ELUS AVENUE
GO.BOX 6127
`2 FOUNTAIN VAUPY.CALIFORNIA 92728.6 t2'
mnfifiz-zan
STAFF REPORT
PDC95-17: Approval of Change Order No. 6 for Priority Projects Elements of
Miscellaneous Improvements to Facilities at Plant No. 1, Job No. P1-38-2.
Summary
Job No. P1-38-2, Priority Projects Elements of Miscellaneous Improvements to Facilities at
Plant No. 1 provides for replacement of all sluice and slide gates within the existing Metering
and Diversion Structure, new foul air scrubbers at Headworks No. 2, modifications to existing
primary sedimentation basins, and other miscellaneous facilities and work items. The design for
this $3.3 million project was performed by John Carollo Engineers and the construction contract
was awarded in June 1993 to Pascal & Ludwig Engineers. Change Order No. 6 is an addition in
the net amount of$34,878.00 to the contract for five items of additional work.
Item 1, in the amount of$16,031.00 is for miscellaneous additional work in connection with
installation on the new sluice gates at the existing Metering and Diversion Structure at
1..: Reclamation Plant No. 1. The items include the following:
A. Additional costs to install certain new sluice gates at the existing Metering and
Diversion Structure on an overtime basis in order to expedite the work. The Districts'
Operations Department requested that the Contractor work extended hours in order
to complete installation of certain sluice gates critical to the operation of the plant.
The contract detailed specifications did not require the Contractor to work overtime
to install the sluice gates. Additional costs for premium time work resulted from the
labor cost differential between regular work hours and overtime work hours as
documented by the Contractor and reviewed by the Districts.
B. Additional costs to drain sewage and remove excessive amounts of sand from the
diversion channel at the Metering and Diversion Structure. The sand had
accumulated in the channel and interfered with installation of three of the new sluice
gates and prevented the Districts from completely draining the diversion channel.
The Contractor was directed to furnish labor and work in a confined space area in
order to dean out the accumulated sand.
C. Additional costs for odor control during installation of new sluice gates at the
Metering and Diversion Structure. The Contractor was directed to provide labor and
materials to install electrical and plumbing to connect a Districts' supplied hydrogen
peroxide tank and pumping unit. During installation of the new sluice gates,
hydrogen peroxide was injected into the raw sewage prior to entering the Metering
and Diversion structure to mitigate odors. The contract documents did not require
the Contractor to provide chemicals for odor control during installation of the sluice
`"'� gates.
D. Additional costs for a temporary bulkhead at the interplant connection on the north
side of the Metering and Diversion Structure. As a precaution for working personnel
during installation of the low side sluice gates, the Contractor was directed to furnish,
install and remove a temporary steel bulkhead at the 78-inch connection to the
interplant pipeline. The work was performed in a designated confined space area.
The bulkhead was found to be necessary to prevent flows from the interplant pipeline
and wastehauler station from flooding the Contractor's work area. The contract
documents did not require the Contractor to install and remove the temporary
bulkhead.
E. Additional costs for the Contractor to clean up the sluice gate installation work area
due to a power outage at Reclamation Plant No. 1. Due to the power outage, the
Sunflower screw pumps were shut down resulting in raw sewage flooding the inlet
channel work area of the Metering and Diversion Structure where the Contractor was
in the process of installing new sluice gates. It was necessary for the Contractor to
temporarily vacate the work area, reenter and clean up before continuing with
installation of the gates.
F. Additional costs to modify one of the sluice gate frames. The existing opening in the
Metering and Diversion Structure for Sluice Gate No. 26 was larger than shown on
the contract drawings and record drawings for the existing structure. It was
necessary for the Contractor to add a stainless steel angle filler piece at the bottom
of the sluice gate frame to reinforce the gate frame installation.
G. Additional costs for the Contractor to modify an existing weir plate, installed
downstream of the existing Santa Ana River Interceptor flow meter in the Metering
and Diversion Structure. The weir plate had been installed by the Districts in order to `..�
keep the flow meter full of sewage during periods of low flows, which is necessary for
the meter to record accurately. The weir plate interfered with the installation of
Sluice Gate Nos. 12a and 12b. The weir plate was not shown on the contract
drawings and record drawings interfered with installation of the gate frames.
Item 2, in the amount of$14,800.00 is remove, regrade and replace 600 square feet of
additional paving in the area around new Diversion Box No. 1 and over the top of existing
Junction Structure "B"which is located in the same area. Included in this change is an
extension of the existing plant store drain system, removal and reconstruction of a concrete pad
around an existing wastehauler dump port and installation of a new bubbler tube system to
provide flow monitoring at the existing Metering and Diversion Structure. The contract drawings
did not show the additional paving modifications, storm drain and bubbler system additions.
These additions were requested by the Districts' Maintenance and Operations Department staff.
Item 3, in the amount of$2,620.00, is for the relocation of the bubbler panel in the scum pump
room at Sedimentation Basins Nos. 1 and 2. The bubbler panel accepts level signals from the
sedimentation basins scum pit in order to control the operation of pumps to remove
accumulated scum. It was necessary to relocate the panel to the south wall of the pump room
due to inadequate work accessability at the east wall location shown on the contract drawings.
The contract drawings did not show additional equipment which had been added to the pump
room and blocked access to the new bubbler panel. The work consisted relocating the bubbler
panel and associated air piping and electrical wiring.
Item 4, in the amount of$956.00, is for the installation of two new stilling wells for bubbler tubing
at the existing Sunflower Pump Station wet well. The stilling wells are used to enclose the
bubbler tubing and facilitate replacement and cleaning of the tubing. The contract drawings
required the Contractor to remove and replace the bubbler tubing within existing stilling wells.
Upon draining and entering the wet well, it was discovered that the stilling wells did not exist
and the bubbler tubing was secured directly to the walls of the wet well. The stilling wells were
shown on the record drawings for construction of the Sunflower Pump Station. .
Item 5, in the amount of$471.00, is for the construction of a 10-toot long gutter inside the new
solution polymer containment area. The contract drawings required the Contractor to construct
a drain pipe and sump to carry overflow and spills from the existing solution polymer tank fill
port. Due to a conflict with an existing electrical ductbank, the Contractor was not able to install
the drain pipe as shown on the contract drawings. As an alternative, the Contractor was
directed to construct a shallow open gutter to the sump with a removable top grate.
Miscellaneous rehabilitation projects within the plants, including Job No. P1-36-2, cover a large
variety of different unrelated construction items located in many different areas of the plants.
Due to the complexity of these projects, changes are often initiated from actual conditions
encountered in the field, rather than being discovered or known in the design phase. Many of
the above changes fall into this category.
The changes described above would have been included in the original design if discovered or
known in the design phase.
The original contract amount for this project was $3,364,600.00. The net increase of change
orders to date is $28,177.00 representing a net increase of 0.84% above the original contract
amount. The project is now approximately 97% complete.
Staff Recommendation
Staff recommends approval of Change Order No. 6 for a net addition of$34,878.00 to the
contract with Pascal & Ludwig Engineers. There is no time extension associated with this
change order.
wpd.1pdg5Ma0J17.sr
Page 1 of 6
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY �
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Pascal & Ludwig Engineers C.O. No.: Six (6)
Dale: May 24, 1995
Job: Priority Projects Element of Miscellaneous Improvements to Facilities at Plant
No. 1. Job No. P1-38-2
Consultant: John Carollo Engineers
Amount of this Change Order(Add)(Deduei) $34.878.00
In accordance with contract provisions, the following changes in the contract and/or contract
work are hereby authorized and as compensation therefor, the following additions to or
deductions from the contract price are hereby approved.
ITEM 1 - INSTALLATION OF SLUICE GATES - MISCELLANEOUS ADDITIONS
A. Additional costs of$9,626.00 to install certain new sluice gates at the existing Metering and
Diversion Structure on an overtime basis on orderto expedite the work. The Districts
requested the Contractor to work extended hours in order to complete installation of Sluice
Gate Nos. 8, 12a, 12b, 16, 19. 20, 21, 22, 25. The work included removal of existing gates
and frames, installation of new gates and frames and grouting and sealing the frames to
existing walls. The contract detailed specifications did not require the Contractor to work
overtime to install the sluice gates. Additional costs for premium time work resulted from the
labor cost differential between regular work hours and overtime work hours as documented by
the Contractor and reviewed by the Districts.
B. Additional costs of$2,491.00 to drain leaking sewage and remove excessive amounts of sand
from the low side of the diversion channel at the Metering and Diversion Structure in order to
install Gate Nos. 23, 24 and 29. The Districts was unable to drain the diversion channel as
required in the Contract specifications due to the buildup of excessive amounts of sand in the
bottom of the channel. The Contractor was directed to furnish labor and work in a confined
space area in order to clean out the accumulated sand.
C. Additional costs of$1,365.00 for odor control during installation of new sluice gates at the
Metering and Diversion structure. The Contractor was directed provide labor and materials to
install electrical and plumbing to connect a Districts' supplied hydrogen peroxide tank and
pumping unit. During installation of the new sluice gates, hydrogen peroxide was injected into
the raw sewage prior to entering the metering and diversion structure to mitigate odors. The
contract documents did not require the Contractor to provide odor control during installation of
the sluice gates.
D. Additional costs of$1,065.00 to install and remove a temporary bulkhead at the interplant
connection on the north side of the Metering and Diversion structure. As a precaution during
installation of the low side sluice gales, the Contractor was directed to fumish, install and V
remove a temporary steel bulkhead at the 78-inch connection to the interplant pipeline. The
work was performed in a designated confined space area. The bulkhead was required to
Page 2 of 6
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor. Pascal & Ludwig Engineers C.O. No.: Six (6)
Date: May 24, 1995
Job: Priority Proiects Element of Miscellaneous Improvements to Facilities at Plant
No. 1. Job No. P1-38-2
Consultant: John Carollo Engineers
prevent flows from the interplant pipeline and wastehauler station from flooding the
Contractor's work area. The contract documents did not require the Contractor to install and
remove the temporary bulkhead.
E. Additional costs of$612.00 for the Contractor to clean up the sluice gate installation work area
due to a power outage at Reclamation Plant No. 1. Due to the power outage, the Sunflower
screw pumps were shut down resulting in raw sewage flooding the inlet channel work area of
the metering and diversion structure where the Contractor was in the process of installing new
sluice gates. It was necessary for the Contractor to clean up the confined space work area
before continuing with installation of the gates.
F. Additional costs of$575.00 to modify the frame for Sluice Gate No. 26. The existing opening
in the Metering and Diversion Structure for Gate No. 26 was larger than shown on the contract
drawings. It was necessary for the Contractor to add a stainless steel angle filler at the bottom
of the sluice gate frame to reinforce the gate frame installation.
G. Additional costs of$297.00 to modify an existing weir plate, installed downstream of the
existing Santa Ana River Interceptor flow meter in the metering and diversion structure. It was
necessary to remove, modify and reinstall the weir plate in order to complete the installation of
Gate Nos. 12a and 12b. The weir plate was not shown on the contract drawings and
interfered with installation of the gate frames.
The above items of work were accomplished by Contractor's force account pursuant to Section
10.6(B)2(b) of the General Provisions. (Reference: FCO Nos. 38, 43, 47, 53)
ADDED COST THIS CHANGE ORDER ITEM: $16,031.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar days
ITEM 2 - PAVING MODIFICATIONS, STORM DRAIN AND BUBBLER SYSTEM ADDITION
The Contractor was directed to remove, regrade and replace 600 square feet of additional paving in
the area around new Diversion Box No. 1 and over the top of existing Junction Structure "B". Also
included in this change is an extension of the existing plant storm drain system with the addition of
two new catch basins and 60 lineal feet of 8-inch Schedule 80 PVC drain pipe; removal and
reconstruction of a concrete pad around an existing wastehauler dump port; and installation of a new
�.d bubbler tube system to provide flow monitoring at the existing Metering and Diversion Structure. The
new bubbler system required installation of 200 linear feet of 2-inch and 3-inch PVC pipe and 7
Page 3 of 6
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728.8127
CHANGE ORDER
Contractor. Pascal & Ludwig Engineers C.O. No.: Six (6)
Date: May 24, 1995
Job: Priority Projects Element of Miscellaneous Improvements to Facilities at Plant
No. 1. Job No. P1-38-2
Consultant: John Carollo Engineers
connecting pull boxes. The contract drawings did not show the additional paving modifications, storm
drain and bubbler system additions. This work was negotiated with the Contractor pursuant to
Section 10-6(S)2(a) of the General Provisions. (Reference: PCH Nos. 17, 17a, 17b)
ADDED COST THIS CHANGE ORDER ITEM: $14,800.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 3 - RELOCATION OF BUBBLER PANELS AT SEDIMENTATION BASINS NO. 1 AND 2
The Contractor was directed to relocate the bubbler panel in the scum pump room at Sedimentation
Basins Nos. 1 and 2. The bubbler panel accepts level signals from the scum pit in order to control the U
operation of Scum Pump Nos. 1 and 2. It was necessary to relocate the panel to the south wall of the
pump room due to inadequate work accessability at the east wall location shown on the contract
drawings. The work consisted relocating the bubbler panel and associated air piping and electrical
wiring. This item of work was accomplished by Contractor's force account pursuant to Section
10-6(B)2(b) of the General Provisions. (Reference: FCO#39)
ADDED COST THIS CHANGE ORDER ITEM: $2,620.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4- SUNFLOWER PUMP STATION BUBBLER STILLING WELL ADDITION
This contract requires the installation of new frinch stainless steel bubbler tubing at two locations
inside the existing Sunflower Pump Station wet well. The contract drawings required the Contractor to
remove and replace the bubbler tubing within existing stilling wells. Upon draining and entering the
wet well, it was discovered that the stilling wells did not exist and the bubbler tubing was secured
directly to the walls. The Districts directed the Contractor to install new stilling wells which required
the addition of 60 lineal feet of 2-inch schedule 60 PVC pipe and six stainless steel brackets. This
item of work was accomplished by Contractor's force account pursuant to Section 10-6(B)2(b) of the
General Provisions. (Reference: FCO#49)
ADDED COST THIS CHANGE ORDER ITEM: $956.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
e
Page 4 of 6
�.i COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Pascal & Ludwig Engineers C.O. No.: Six(6)
Date: May 24, 1995
Job: Priority Projects Element of Miscellaneous Improvements to Facilities at Plant
No. 1, Job No. P1-38-2
Consultant: John Carollo Engineers
ITEM 5 -SOLUTION POLYMER CONTAINMENT GUTTER
The Contractor was directed to construct a 10-toot long gutter inside the new solution polymer
containment area. The contract drawings required the contractor to construct a 6-inch pipeline and
sump to carry overflow and spills from the existing solution polymer tank. Due to a conflict with an
existing electrical ductbank, the Contractor was not able to install the drain pipe as shown on the
contract drawings. As a alternative, the Contractor was directed to construct an open 4-inch x 12-inch
open gutter to the sump with a removable top grate. This item of work was accomplished by
Contractor's force account pursuant to Section 10-6(B)2(b) of the General Provisions. (Reference:
PCH#16)
ADDED COST THIS CHANGE ORDER ITEM: $471.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL COST THIS CHANGE ORDER: $34,878.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
Page 5 of 6
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Pascal & Ludwig Engineers C.O. No.: Six (6)
Date: May 24, 1995
Job: Priority Projects Element of Miscellaneous Improvements to Facilities at Plant
No. 1. Job No. P1-38-2
Consultant: John Carollo Engineers
The additional work contained within this Change Order can be performed incidental to the prime work
and within the time allotted for the original Contract and any extensions to the Contract time made by
this and all previously issued Change Orders. It is therefore mutually agreed that no time is required
for this Change Order, and no direct or indirect, incidental or consequential costs, expenses, losses or
damages have been or will be incurred by Contractor, except as expressly granted and approved by
this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: July 21, 1993
Original Contract Time: 420 Calendar Days
Original Completion Date: September 13, 1994
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 0 Calendar Days
Revised Contract rime: Not Applicable
Revised Final Completion Due Date: Not Applicable
Time Subject to Liquidated Damages: Not Applicable
Actual Final Completion Date: Not Applicable
Original Contract Price $ 3,364,600.00
Prev. Authorized Changes $ (6,701.00)
This Change (Add) (Deduek) $ 34,878.00
Amended Contract Price $ 3,392,777.00
Page 6 of 6
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Pascal & Ludwig Enaineers C.O. No.: Six (6)
Date: May 24. 1995
Job: Priority Proiects Element of Miscellaneous Improvements to Facilities at Plant
No. 1. Job No. P1-38-2
Consultant: John Carollo Engineers
Board Authorization Date: May 24, 1995
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
Submitted by: z Recom nded by:
zr 9s—
ngineering Manager Date Construction Manager Date
/1
Ap oyed by: Approv g-as to Fo
SP - �' �Go---r
Director of Engineering Date Gene I Counse Date
Accepted by.
PASCAL&LUDMG ENGINEERS
&h� % s<.a QOON� Ale zc tgSS
Contractor Date
u
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
F� MAY 24, 1995
Agenda Item (13)(b)(6): PDC95-18 Consideration of motion approving
Change Order No. 7 to the plans and
specifications for Secondary Treatment
Expansion at Plant No. 2, Job No. P2-42-2, authorizing an addition of$31,673.00 to the
contract with Margate Construction, Inc. for two items of additional work
Summary
Job No. P2-42-2 is a $14.5 million contract to expand the secondary treatment capacity at Plant
No. 2 by lengthening the clarifiers and installing other improvements. The project will increase
the secondary capacity from 75 million gallons per day(mgd) to 90 mgd. Changes in the work
have been required that resulted in increased costs. A staff report is attached which details the
items included in this change order. There is no time extension associated with this change
order.
The following is a summary of the contract amount:
Original Contract Amount: $14,496,000.00
Previously Approved Changes: $ (122,496.00)
This Change (Add) (Gedust): $ 31,673.00
Amended Contract Amount: $14,405,177.00
PDC Committee Recommendation
The PDC Committee recommends approval of Change Order No. 7 for an addition of
$31,673.00 to the contract with Margate Construction, Inc.
Executive Committee Recommendation
The Executive Committee recommends approval of Change Order No. 7 for an addition of
$31,673.00 to the contract with Margate Construction, Inc.
0&13M
-- COUNTY SANITATION DISTRICTS
��. of ORANGE COUNTY, CALIFORNIA
May 4, 1995 teem Au¢evENus
vo.Box BIR7
FOUNTAIN VALLEY.CALIFORNIA 92728.61
0141 86 2-2411
STAFF REPORT
PDC95-18: Proposed Change Order No.7 to the Plans and Specifications Secondary Treatment
Expansion at Plant No.2,Job No.P2-42-2
summary
Job No. P2-42-2 is a $14.5 million contract to expand the secondary treatment capacity at Plant No.2 by
lengthening the clarifiers and installing other improvements. The project will increase the secondary
capacity from 75 million gallons per day(mgd)to 90 mgd. The plans and specifications for this project
were prepared by John Carollo Engineers in 1990 and the construction contract was awarded in April
1993 to Margate Construction,Inc. Change Order No.71s a net addition of$31,673.00 to the contract for
two items of added work. This contract is approximately 84%complete.
Item 1,in the amount of$30,996.00, provides labor and material to upgrade two Man Machine Interfaces
(MMI)from those provided for in the project specifications. An MMI is essentially a video control panel
that uses interactive graphic displays to indicate operating parameters and process information allowing
the operations staff to control the equipment. The specified units will not provide the Districts with the
software flexibility required to communicate with current and future process control computers. This
project was designed and specified several years ago when the need for the additional flexibility regarding
software was not known. Staff considered several options for providing the MMI units and upgrading the
units now,while in construction,was found to be far more cost efficient. Postponing this work for a future
project will result in a significantly more expensive installation. Keeping the project specified units will
result in increased maintenance and/or inefficient operating procedures for controlling the Dissolved Air
Flotation(DAF)Thickeners and related equipment.
Item 2,in the amount of$677.00, provides for added labor to remedy an interference between a structural
support member and an existing pipeline. On Change Order No.6,Item No.1 for this project,the
entrances for the Digester Pump Rooms were modified to facilitate maintenance. During the installation,
however,it was discovered that one support for the new grating over the tunnel interfered with an active
pipe. The Contractor was directed to field modify the installation to avoid interference.
The above would have been included in the original design if discovered or known in the design phase.
The original contract amount for this project was$14,496,000.00. The net difference in contract price due
to change orders to date is a credit of$122,496.00 and an addition of 239 calendar days to the contract
schedule. This represents a decrease of 0.85%from the original contract amount. The contract provides
for assessment of liquidated damages in the amount of$750.00 per day.
Staff Recommendation
Staff recommends approval of Change Order No.7 for an addition of$31,673.00 to the contract Nth
Margate Construction,Inc. There is no time extension associated with this change order.
wpdoc1y4c95Maya1 B.sr
Page 1 of 3
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
108" ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Margate Construction, Inc. C.O. No.: Seven (7)
Date: Mav 24. 1995
Job: Secondary Treatment Expansion Protect Job No. P2-42-2
Consultant: John Carollo Engineers
Amount of this Change Order(Add)(Bedust) $ 31,673.00
In accordance with contract provisions, the following changes in the contract and/or
contract work are hereby authorized and as compensation therefor, the following
additions to or deductions from the contract price are hereby approved.
ITEM 1 -CHANGE CONTROL PANEL HARDWARE
The Man-Machine Interfaces(MMI)specified in the contract documents will not provide the Districts the
software flexibility necessary to effectively communicate with current and future plant process control
computers. An MMI is essentially a video control panel that uses interactive graphic displays to indicate
operating parameters and process information allowing the operations staff to control the equipment. The
Secondary Expansion Project was designed several years ago when the need for the additional flexibility
in software was not known.This change order will upgrade the panels during construction,thereby, l,J
providing the most cost effective alternative available. Postponing this work for a future project will result
in a significantly more expensive installation. Keeping the project specified panels will result in increased
maintenance and/or inefficient operating procedures for controlling the DAF Thickeners and related
equipment. This change order provides for upgrading two MMIs,the support hardware and software. This
change order item was negotiated pursuant to Section 10-6(B)2(a)of the General Provisions(Reference
PCH-P2422-017).
ADDED COST THIS CHANGE ORDER ITEM: $30,996.00
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
ITEM 2-INTERFERENCE WITH GRATING SUPPORT
Change Order No.6,Item No. 1 for this project added modifications to the Digester Pump Room
entrances to improve access for maintenance purposes. During the installation of this work,an
interference was discovered between the structural grating support and an existing Digester overflow
pipeline. The Districts directed the Contractor to make some minor field adjustments to alleviate the
interference. The work was performed by the Contractor on a force account basis pursuant to Section
10-6(B)2(b)of the General Provisions(Reference FCO-P2422-011A).
ADDED COST THIS CHANGE ORDER ITEM: $677.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL ADDED COSTS THIS CHANGE ORDER: $31,673.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
u
Page 2 of 3
`..� COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Maroate Construction, Inc. C.O. No.: Seven (7)
Date: May 24, 1995
Job: Secondary Treatment Extansion Proiect Job No. 132-42-2
Consultant: John Carollo Encineers
The additional work contained within this Change Order can be performed incidental to the
prime work and within the time allotted for the original Contract and any extensions to the
Contract time made by this and all previously issued Change Orders. It is therefore mutually
agreed that no time is required for this Change Order, and no direct or indirect, incidental or
consequential costs, expenses, losses or damages have been or will be incurred by Contractor,
except as expressly granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: June 2, 1993
Original Contract Time: 730 Calendar Days
Original Completion Date: June 1, 1995
Time Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 239 Calendar Days
Revised Contract Time: 969 Calendar Days
Revised Final Completion Due Date: January 26, 1996
Time Subject to Liquidated Damages: Not Applicable
Actual Final Completion Date: Not Applicable
Original Contract Price $ 14,496,000.00
Prev. Authorized Changes $ (122,496.00)
This Change (Add) (Dedeat) $ 31,673.00
Amended Contract Price $ 14,405,177.00
Page 3 of 3
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
108" EWS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor. Maroate Construction, Inc. C.O. No.: Seven (7)
Date: May 24, 1995
Job: Secondary Treatment Expansion Project. Job No. P242-2
Consultant: John Carollo Engineers
Board Authorization Date: May 24, 1995
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
Submitted by: eebmq deby: /
ngineering Manager Date onsiruction aer Date
Appro d by: Approv as onn:
o -
Direttor of Engineering Date Ge eral Counsel Date
Accepted by.
MARGATE CONSTRUCTION, INC.
Cofitractor Date
h
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(b)(7): PDC95-19 Consideration of motion approving
Change Order No. 5 to the plans and
specifications for Electrification of Pump Drives
at Treatment Plant No. 1, Job No. 121-36-1; Security and Landscaping Element of
Miscellaneous Improvements to Facilities at Plant No. 1, Job No. P1-38.1; Miscellaneous
Improvements to Facilities at Plant No. 1, Job No. P1-384; and Miscellaneous
Improvements to Facilities at Treatment Plant No. 2, Job No. P243-3, authorizing a net
addition of$40,069.00 to the contract with Advanco Constructors Inc., Division of Zum
Constructors, Inc., for 13 items of additional or deleted work.
Summary
Job No. P1-36-1 at al is a combination of projects designed by John Carollo Engineers and Districls'staff.
The work includes removing existing digester gas-0riven engines and replacement them with electric
motors;construction of a new guard shack on the North Perimeter Road, new fencing,landscaping,
lighting and security improvements;exterior improvements to existing painted buildings,installing a high
pressure instrument air system, replacing the paging system at both plants,constructing a new emulsion
polymer facility,electrical improvements to the new laboratory; removing existing digester gas compressor
engine, and replacing existing boilers. Changes in the work have been required that resulted in additional
costs. A staff report is attached that details the items included in this change order. There is no time
extension associated with this change order.
The following is a summary of the contract amount:
Original Contract Amount $6,059,364.00
Previously Approved Changes 95,653.00
This Change (Add) (Dedaet) 40,069.00
Amended Contract Amount $6,195,086.00
PDC Committee Recommendation
The PDC Committee recommends approval of Change Order No.5 for an addition of$40,069.00 to the
contract with Advance Constructors.
Executive Committee Recommendation
The Executive Committee recommends approval of Change Order No. 5 for an addition of$40,069.00 to
the contract with Advance Constructors.
0613V
L COUNTY SANITATION DISTRICTS
nr ORANGE COUNTY. CALIFORNIA
a May 4, 1995 toew ELLI9 AVENUE
8127
E011NEA,N VALLEY,CALIFORNIA 92729.9127
STAFF REPORT O1AI952-Ul1
PDC95-19: Proposed Change Order No. 5 to the Plans and Specifications Electrification
of Pump Drives at Reclamation Plant No. 1, Job No. P1-36-1; Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant
No. 1, Job No. P7-38-1; Miscellaneous Improvements to Facilities at Plant
No. 1, Job No. P1-38-4; and Miscellaneous Improvements to Facilities at
Treatment Plant No. 2, Job No. 102-43-3
Summary
This project combines several jobs designed by both John Carollo Engineers and Districts' staff.
Job No. P1-36-1; Electrification of Pump Drives at Reclamation Plant No. 1, provides for the
removal of existing digester gas-driven engines that drive the pumps that transfer the primary
effluent into the aeration basins for secondary treatment and replacement with electric motors. Job
No, P1-38-1; Security and Landscaping Element of Miscellaneous Improvements to Facilities at
Plant No. 1, includes a new guard shack on North Perimeter Road, new fencing along the East and
West Perimeter Roads, new landscaping, lighting and security improvements for protection inside
the plant. Job Nos. Pt-38-4 and J-17-2; Miscellaneous Improvements to Facilities at Plant No. 1,
provides for exterior improvements to existing painted maintenance buildings, installation of a high
`►' pressure instrument air system, replacement of the paging system at both plants, construction of
an emulsion polymer facility, electrical improvements to the new laboratory and other
miscellaneous improvements to Plant No 1. Job No. P2-43-3; Miscellaneous Improvements to
Facilities at Treatment Plant No. 2, includes interior improvements to existing painted process
buildings, removal of existing digester gas compressor engine, replacement of existing boilers and
other miscellaneous improvements to Plant No. 2. The construction contract was awarded in
December 1993 to Advanco Constructors.
Job No. P1-36-1
Item 1, in the amount of$9,895.00, is for a temporary pumping system for the Primary Effluent
Pump Station (PEPS)wet well at Reclamation Plant No. 1. The contract drawings required the
Contractor to fabricate and install two temporary steel bulkheads where two existing 60-inch
diameter influent pipes enter the wet well. The steel bulkheads were necessary to seal flows from
the inlet pipes and allow the Contractor to install a new PEPS 14-inch submersible pump in the wet
well. The bulkheads were fabricated and installed as shown on the contract drawings, but due to
imperfections in the existing wet well walls, the bulkheads did not seal effectively when flows were
restored. These deformations in the existing walls were not discovered by the Contractor until the
wet well was opened, drained and entered by the Contractor's personnel. Due to leakage of
effluent from behind the bulkheads, the Contractor was prevented from working in the wet well
without installing a temporary pumping system to control the effluent.
Item 2, in the amount of$1,965.00, is for the purchase of a new 36-inch diameter blind flange for
the 14-inch submersible pump connection at the Primary Effluent Pump Station (PEPS) at
�..✓ Reclamation Plant No. 1. The contract drawings required the Contractor to add a 14-inch nozzle to
the existing blind flange. It would have been necessary for the Contractor to send out the existing
flange to a fabrication shop to have these modifications done, requiring the plant to be out of
service for approximately one week. The Districts' operations department would not allow the plant
to be shutdown for this extended period of time. This change allowed the Contractor to fabricate
the blind flange and 14-inch nozzle prior to installation, resulting in a plant shutdown of less than 6
hours; costs included in this item are for the blind flange material only.
Job. No. P1-38-1
Item 3, in the amount of$25,748.00, is for the relocation of a portion of a new 18-inch storm drain
being installed under this contract along Fuentes Road at Reclamation Plant No. 1. It was
necessary to relocate the new storm drain in order to avoid inference with an existing 48-inch
secondary effluent pipeline shown incorrectly on the contract drawings. The alignment of the
48-inch secondary effluent pipeline was modified during installation under a previous contract and
as-built information on the change was not made available to the design engineer during design of
this project. If the as-built information had been included in the contract drawings, the Contractor's
bid would have reflected the additional work included in this item. Relocation of the new 18-inch
storm drain also resulted in an additional conflict with a 10-inch pipeline serving the digester
cleaning beds. Additional work included potholing and locating the extent of the existing 48-inch
effluent pipeline, removal and replacement of a portion of the existing 10-inch pipeline, removal
and replacement of concrete rolled curb and concrete cross gutter and removal and replacement of
additional asphalt paving and aggregate base materials.
Item 4, in the amount of$2,517.00, is for the relocation of a new 6-inch sanitary drain from the new
guard shack on the North Perimeter Road to the existing inlet channel at Reclamation Plant No. 1.
It was necessary to relocate the drain pipe in order to avoid a conflict with an existing electrical
ductbank serving the Sunflower Pump Station. Additional work included potholing and locating the
extent of the existing concrete encased electrical ductbank, retrenching and relaying a portion of U
the new 6-inch drain pipe in a new alignment. The contract drawings did not show the existing
concrete encased electrical ductbank.
Item 5, in the amount of$1,043.00, is for modifications to the contract-specified storm drain inlet
structure located in the newly graded area south of the digester cleaning beds at Reclamation
Plant No. 1. The modifications included adding a screen around the opening and filling with gravel
around the perimeter of the inlet structure. The modifications were requested by the Districts'
maintenance department in order to restrict flows into the existing Waste Sidestream Pump Station
during periods of heavy rainfall. The contract drawings did not show the modifications to the storm
drain inlet structure.
Item 6, a credit in the amount of$322.00, is for the deletion of a 2-inch gate valve and valve box at
the City Water Pump Station at Reclamation Plant No. 1. The valve and valve box were shown on
the contract drawings at the main connection location for a new landscape irrigation system along
the East Perimeter Road, being installed under this contract. This valve had previously been
installed under another contract and therefore was not required.
Job No. P1-38-4 -
Item 7, in the amount of$3,167.00, is to change the water source at the polymer mix tanks at
Reclamation Plant No. 1 from industrial water to potable water. This change was requested by the
Districts' operations department as the existing industrial water source is heavily chlorinated which
results in reducing the effectiveness of the mixed polymer by approximately 50%. The additional
work included furnishing and installing a 3-inch backflow preventer to protect the potable water tri
supply, 2-inch gate valve and modifications to the existing industrial and city water piping. These
9
' modifications were not shown on the contract drawings.
d..� Item 8, in the amount of$2,252.00. is for the addition of a driveway approach south of the new
emulsion polymer containment area along Fuentes Road at Reclamation Plant No. 1. This change
was requested by the Districts' maintenance department to provide vehicle access into the area.
The additional work included sawcutting the existing concrete curb and gutter, removal of 24 feet of
existing curb and gutter and replacement with a concrete driveway approach.
Item 9, in the amount of$374.00, is to perform a "hot tap" connection to an existing 18-inch high
pressure air line in Tunnel No. 1 at Reclamation Plant No. 1. The contract drawings required the
Contractor to weld a 2-inch nozzle on an existing 18-inch plant air steel pipe, presently pressurized
and in service. For the Contractor to perform this work, a shutdown of all compressed air systems
within the plant would have been required. The Districts' operations department determined that
the time and effort required to shutdown the compressed air system was unacceptable and
requested that the Contractor make the required connection using the"hot tap" method. The
additional work included furnishing and installing a"hot tap" saddle and tapping a 2-inch hole in the
existing 1 8-inch steel pipe.
Item 10, a credit in the amount of$2,634.00, is for the deletion of 477 square feet of digester dome
roof insulation repairs at Reclamation Plant No. 1. The contract drawings required roof insulation
repairs to be performed on Digesters 5, 6, 7 and 8. When the Contractor began the removal of
deteriorated insulation on Digesters 7 and 8, a field inspection detected digester gas leaking from
several areas on the domes, creating a potential safety hazard. The Districts' operations
department removed Digesters 7 and 8 from service and repairs will be made to the two digesters
in the future. The Contractor was directed to stop work on Digesters 7 and 8 and credit back costs
of the deleted work
Job No. P2-43-3
Item 11, in the amount of$1673.00, is for replacing corroded plant water piping beyond the scope
of the original contract and reinforcing hose bib assemblies. The contract required replacing
sections of existing corroded galvanized steel pipe with new PVC piping and new hose bibs in the
Dewatering Building. However, corroded piping was encountered beyond the limits of piping
replacement shown on the drawings and additional corroded piping was removed and replaced.
Additionally, the PVC hose bibs assemblies as called out in the documents did not withstand forces
applied when hoses were pulled during building washdowns. The hose bibs were relocated and
secured to prevent further hose bib failures.
Item 12, in the amount of$767.00, is for the demolition of existing boiler feed water pump bases
and labor required to install one 2-inch check valve at each of the two feed water inlets on the new
boilers at Treatment Plant No. 2. The contract drawings specified that the existing feed water
pump bases be modified as required to fit the new feed water pumps. The existing pump bases
were badly deteriorating and in need of complete replacement. Additional costs included in this
item include labor to demolish the existing concrete pump bases and materials required to replace
the pads. The check valves were required in the contract drawings but were incorrectly deleted
during the submittal process. Other check valves were specified in the contract to be installed on
the water supply lines to prevent backfiow of water when the feed water pumps are not operating.
Consequently, the additional feed water check valves at the boilers were deemed redundant.
However, it was later realized after the piping was installed that the deleted valves were required
by pressure vessel codes. There are no additional costs included in this item for purchase of the
J valves.
Item 13, a credit in the amount of$6,376.00, is for the deletion of 1,380 square feet of digester '.
dome roof insulation repairs at Treatment Plant No. 2. The Contract Drawings required roof
insulation repairs to be performed on Digesters C, D, E, F. G, and H but a field inspection of the
existing dome insulation verified that a portion of the repairs in the specified area were
unnecessary.
Miscellaneous rehabilitation projects within the plants, including Job Nos. P1-36-1, 151-38-2,
P1-38-4, J-17-2 and P243-3, cover a large variety of unrelated construction items located in many
different areas of the plants. Due to the complexity of these projects, changes are often initiated
after actual conditions encountered in the field, differ from those assumed, discovered or known in
the design phase. Many of the above changes fall into this category.
The changes described above would have been included in the original design if discovered or
known in the design phase.
The original contract amount for this project was $6,059,364.00. The project is now approximately
89% complete. The net amount of change orders to date is $135,722.00, representing a net
increase of 2.24% above the original contract amount.
Staff Recommendation
Staff recommends approval of Change Order No. 5 for an addition of$40,069.00 to the contract
with Advanco Constructors. There is no time extension associated with this change order.
wpdw1pdc95Msyait 9.sr
Page 1 of 8
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE,P.O.BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advanco Constructors C.O. No.: Five(5)
Division of Zurn Constructors,Inc. Date: May 24. 1995
Job: Electrification of Pump Drives at Reclamation Plant No. 1.Job No.P1-36-1: Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant No. 1.Job No. P1.38-1:
Miscellaneous Improvements to Facilities at Plant No.1.Job P1-384: and Miscellaneous
Improvements to Facilities at Plant No. 2.Job No. P243-3
Consultant John Carollo Enoineers
Amount of this Change Order(Add)(9edu6t) $40.069.00
In accordance with contract provisions,the following changes in the contract and/or contract work are
hereby authorized and as compensation therefor,the following additions to or deductions from the
contract price are hereby approved.
Job No.P1-36-1
ITEM 1 -TEMPORARY WET WELL PUMPING AT PRIMARY EFFLUENT PUMP STATION (PEPS)
The Contractor was directed to furnish,install and remove a temporary pumping system for the Primary Effluent
Pump Station (PEPS)wet well at Reclamation Plant No. 1. The Contract Drawings required the Contractor to
fabricate and install two temporary steel bulkheads where two existing 60-inch diameter influent pipes enter the
wet well. The steel bulkheads were necessary to seal off flows from the inlet pipes and allow the Contractor to
install a new PEPS 144nch submersible pump. The bulkheads were fabricated and installed as shown on
Contract Drawing 1S02,but due to imperfections in the existing wet well walls,the bulkheads did not seal
effectively when flows were restored. Due to the excessive leakage,the Contractor was prevented from working
in the wet well without taking further steps to control the effluent The contract specifications did not address the
potential problem of excessive leakage behind the bulkheads in the PEPS wet well. Included in this item are
additional costs for rental,installation and removal of a 10 horsepower temporary pump and piping,electrical
hookup,desilting box rental and construction and removal of a temporary water barrier at the bottom of the wet
well to contain the leaking effluent. This Rem of work was accomplished by Contractor's force account pursuant
to Section 10-6(B)2(b)of the General Provisions. (Reference: FCO No.25).
ADDED COST THIS CHANGE ORDER ITEM: $9,895.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 2-36-INCH BLIND FLANGE AT PRIMARY EFFLUENT PUMP STATION (PEPS)
The Contractor was directed purchase a 364nch Class D blind flange for the new 144nch submersible pump
tie-in at the Primary Effluent Pump Station(PEPS)at Reclamation Plant No. 1. The contract drawings required
removal the existing 364nch blind flange,cutting a hole and welding on a new a 144nch nozzle and reinstalling
the blind flange. itwould have been necessary for the Contractor to send out the existing flange to a fabrication
shop to have these modifications done,requiring the plant to be out of service for approximately one week. The
Districts'operations department would not allow the plant to be shut down for this extended time period. This
change allowed the Contractor to fabricate the blind flange and 14-inch nozzle prior to installation,resulting in a
plant shutdown of less than 6 hours. Additional costs included in this item are for the cost of the blind flange
only. This Rem of work was accomplished by Contractor's force account pursuant to Section 10-6(5)2(b)of the
General Provisions. (Reference: FCO#28).
�...' ADDED COST THIS CHANGE ORDER ITEM: $1,965.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 2 of 8
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O.BOX 8127 `✓�
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advanco Constructors C.O. No.: Five (5)
Division of Zum Constructors, Inc. Date: May 24, 1995
Job: Electrification of Pump Drives at Reclamation Plant No. 1.Job No. P1-36-1: Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant No. 1.Job No. P1-38-1:
Miscellaneous Improvements to Facilities at Plant No.1.Job P1-38-C and Miscellaneous
Improvements to Facilities at Plant No. 2, Job No. P2-43-3
Consultant John Carollo Engineers
JOB NO.Pt-38-1
ITEM 3-RELOCATION OF 18-INCH STORM DRAIN ON FUENTES ROAD
The Contractor was directed to relocate a portion of a new 18-inch storm drain being installed under this contract
along Fuentes Road at Reclamation Plant No. 1. It was necessary to relocate the new storm drain in order to
avoid a conflict with an existing 484nch secondary effluent pipeline shown incorrectly on the contract drawings.
Relocating the 18-inch storm drain also resulted in an additional conflict with a 10-inch pipeline serving the
digester cleaning beds. The additional work included potholing and locating the existing 484nch sewer,removal
and replacement of 60 lineal feet of existing 104nch ductile iron pipeline and thrust blocks,removal and
replacement of 80 linear feet of concrete rolled curb,concrete cross gutter and removal and replacement of an
additional 1,429 square feet of asphalt paving and aggregate base materials. The contract drawings showed the
alignment of the existing 48-inch secondary effluent pipeline in a different location than what was uncovered in
the field. This Rem of work was accomplished by Contractor's force account pursuant to Section 106(B)2(b)of `..�
the General Provisions. (Reference:FCO No.9).
ADDED COST THIS CHANGE ORDER ITEM: $25,748.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 4-RELOCATION OF 6-INCH GUARD SHACK SANITARY DRAIN
The Contractor was directed to relocate a new 64nch sanitary drain from the new guard shack on the North
Perimeter Road to the existing inlet channel at Reclamation Plant No. 1. It was necessary to relocate the drain
pipe in order to avoid a conflict with an existing electrical ductbank serving the Sunflower Pump Station. The
additional work included potholing and locating the extent of the existing concrete encased electrical ductbank,
retrenching and relaying 70 lineal feet of new 64nch ductile drain pipe in a new alignment,requiring 2 additional
22%degree pipe bends and concrete thrust blocks. The contract drawings did not show the existing concrete
encased electrical ductbank. This Rem of work was accomplished by Contractor's force account pursuant to
Section 106(B)2(b)of the General Provisions. (Reference:FCO No. 10)
ADDED COST THIS CHANGE ORDER ITEM: $2,517.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 3 of 8
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE,P.O. BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advanco Constructors C.O.No.: Five (5)
Division of turn Constructors. Inc. Date: May 24, 1995
Job: Electrification of Pump Drives at Reclamation Plant No. 1.Job No.P1-36-1: Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant No. 1.Job No. Pl-38-1:
Miscellaneous Improvements to Facilities at Plant No.1.Job P1-384, and Miscellaneous
Improvements to Facilities at Plant No 2. Job No. P243-3
Consultant: John Carollo Engineers
ITEM 5-MODIFICATION OF STORM DRAIN INLET
The Contractor was directed to modify the contract-specified Type V storm drain inlet in the new graded area
south of the digester cleaning beds at Reclamation Plant No. 1. The modifications included adding a screen
around the opening and filling gravel around the perimeter of the inlet structure. The modifications were
requested by the Districts'maintenance department in order to restrict flows into the existing waste sidestream
pump station during periods of heavy rainfall. The contract drawings did not show the modifications to the new
storm drain inlet This item of work was accomplished by Contractor's force account pursuant to Section
10-6(B)2(b)of the General Provisions. (Reference: FCO No.42).
ADDED COST THIS CHANGE ORDER ITEM: $1,043.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 6-DELETION OF IRRIGATION VALVE AND VALVE BOX
The Contractor was directed to delete a 24nch gate valve and valve box at the city water pump station at
Reclamation Plant No. 1. The valve and valve box were shown on the contract drawings at the main connection
point for the new landscape irrigation system along the East Perimeter Road,being installed under this contract.
This valve had previously been installed under Contract No.P146-1 and therefore was not required. This Rem
of work was negotiated with the Contractor pursuant to Section 10-6(B)2(a)of the General Provisions.
(Reference:FCO No. 2)
CREDIT THIS CHANGE ORDER ITEM: ($322.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
JOB NO.PI-384
ITEM 7-CHANGE WATER SOURCE AT POLYMER MIX TANKS
The Contractor was directed to change the water source at the polymer mix tanks at Reclamation Plant No. 1
from industrial water to potable water. This change was requested by the Districts'operations department as the
existing industrial water source is heavily chlorinated which reduces the effectiveness of the mitred polymer by
approximately 50%. The additional work included famishing and installing a 3inch reduced pressure type
back0ow preventer,2-inch gate valve and modifications to existing 24nch,34nch and 84nch industrial and city
water piping. This Bem of work was accomplished by Contractor's force account pursuant to Section 10-6(B)2(b)
of the General Provisions. (Reference:FCO No. 31)
4..� ADDED COST THIS CHANGE ORDER ITEM: $3,167.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
Page 4 of 8
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
108"ELLIS AVENUE, P.O. BOX 8127 1r!
FOUNTAIN VALLEY, CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advanco Constructors C.O. No: Fite(5)
Division of Zum Constructors, Inc. Date: Mav24. 1995
Job: Electrification of Pump Drives at Reclamation Plant No 1 Job No P1-36-11 Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant No. 1.Job No. P1-38-1:
Miscellaneous Improvements to Facilities at Plant No.1. Job Pt-38 4: and Miscellaneous
Improvements to Facilities at Plant No 2 Job No.P243-3
Consultant: John Carollo Engineers
ITEM 8-DRIVEWAY APPROACH AT EMULSION POLYMER AREA
The Contractor was directed to add a driveway approach south of the new emulsion polymer containment area
along Fuentes Road at Reclamation Plant No. 1. This change was requested by the Districts'maintenance
department to provide vehicle access into the area. The additional work included sawcutting the eristing
concrete curb and gutter on both ends, removal of 24 lineal feet of e>osting curb and gutter and replacement with
a Type"A"driveway approach. This Rem of work was accomplished by Contractors force account pursuant to
Section 10-6(B)2(b)of the General Provisions. (Reference: FCO No. 17)
ADDED COST THIS CHANGE ORDER ITEM: $2,252.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 9-HOT TAP EXISTING HIGH PRESSURE PLANT AIR PIPELINE
The Contractor was directed to hot tap an wasting 184nch high pressure air line in Tunnel No. 1 at Reclamation
Plant No. 1. The contract drawings required the Contractor to weld a 2-inch nozzle on an erisbng 18-inch plant
air steel pipe,presently pressurized and in service. For the Contractor to perform this work,a shutdown of all
compressed air systems within the plant would have been required. The Districts'operations department
determined that the time and effort required to shut down the compressed air system was unacceptable and
requested that the Contractor perform the connection using the"hot tap"method. The additional work included
furnishing and installing a hot tap saddle and tapping a 24nch hole in the wasting 18-inch steel pipe. This Rem of
work was accomplished by Contractors force account pursuant to Section 10-6(8)2(b) of the General Provisions.
(Reference:FCO No.44).
ADDED COST THIS CHANGE ORDER ITEM: $374.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
ITEM 10-DELETION OF DIGESTER DOME ROOF INSULATION REPAIRS
The Contractor was directed to delete 477 square feet of digester dome roof insulation repairs at Reclamation
Plant No. 1. The Contract Drawings required roof insulation repairs to be performed on Digesters 5,6,7 and 8.
When the Contractor began removal of deteriorated insulation on Digesters 7 and 8,field inspection detected
digester gas leaking from the roofs,creating a safety hazard. The Districts'operations department removed
Digesters 7 and 8 from service and repairs will be made to the two digesters in the future. The Contractor was
directed to stop work on Digesters 7 and 8 and credit back the costs of the deleted work. This Rem of work was
negotiated with the Contractor pursuant to Section 10-6(B)2(a) of the General Provisions. (Reference: PCH#23)
CREDIT THIS CHANGE ORDER ITEM: ($2,634.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
W Page 5 of 8
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE, P.O. BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advanco Constructors C.O. No.: Five (5)
Division of Zurn Constructors Inc. Dale: May 24, 1995
Job: Electrification of Pump Drives at Reclamation Plant No 1 Job No. Pt-36-1' Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant No 1.Jab No. P1-38-11
Miscellaneous Improvements to Facilities at Plant No.1 Job Pt-384� and Miscellaneous
Improvements to Facilities at Plant No, 2.Job No. P243-3
Consultant: John Carollo Engineers
JOB NO.P243-3
ITEM 11 -MODIFICATIONS TO DEWATERING BUILDING PLANT WATER PIPE REPLACEMENT
This hem is for replacing corroded plant water piping beyond the scope of the original contract and reinforcing
hose bib assemblies. The contract required replacing sections of existing corroded galvanized steel pipe with
new PVC piping and new hose bibs in the Dewatedng Building(Ref:Contract Drawing M-9)at Treatment Plant
No.2. However,corroded piping was encountered beyond the limns of piping replacement shown on the
drawings and additional corroded piping was removed and replaced. Additionally,the PVC hose bib assemblies
as called out in the documents were not able to withstand forces applied when hoses were pulled during building
washdowns. The hose bibs were relocated and secured to prevent further hose bib failures. This hem was
accomplished by Contractor's force account pursuant to Section 10-6(B)2(b)of the General Provisions.
(Reference: FCO Nos.33,3B)
ADDED COST THIS CHANGE ORDER ITEM: $1,673.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 CALENDAR DAYS
ITEM 12-REPLACEMENT OF EXISTING BOILER FEED WATER PUMP BASES AND INSTALL CHECK
VALVES
This hem is for the demolition of existing boiler feedwater pump bases and the addition of one two-inch check
valve at each of two boiler feed water inlets on the new boilers at Treatment Plant No.2. The contract drawings
specified that the edsbng feed water pump bases be modified as required to fit new pumps being provided as
part of the contract(Ref: Section ElDrawing M4). The epsbng pump bases were found to be badly deteriorated
and in need of replacement. Additional costs to the contract include labor to demolish the eristing pump pads
and materials required to completely replace the pads. The check valves are required in the contract drawings
but were incorrectly deleted during the submittal process(Ref:Section B/Drawing M-3).Other check valves are
installed on the lines to prevent backfiow of water when the feedwater pumps are not operating. Consequently,
these additional valves at the boilers were deemed redundant. However, h was later realized after the piping
was installed that the deleted valves were required by pressure vessel codes. There is no additional cost
included for the purchase of the valves. This hem was accomplished by Contractor's force account pursuant to
Section 10-6(B)2(b)of the General Provisions. (Reference:FCO Nos.37 and 41).
ADDED COST THIS CHANGE ORDER ITEM: $767.00
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 CALENDAR DAYS
Page 6 of 8
L
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE,P.O.BOX 8127 Ls�
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advance Constructors C.O.No.: Five (5)
Division of Zurn Constructors,Inc. Date: May 24, 1995
Jab: Electrification of Pump Drives at Reclamation Plant No. 1 Job No. Pi-36-1: Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant No 1 Job No. P1-38-1'
Miscellaneous Improvements to Facilities at Plant No.1 Job P1-38-C and Miscellaneous
Improvements to Facilities at Plant No.2, Job No. P2.43-3
Consultant: John Carollo Engineers
ITEM 13-DELETION OF DIGESTER DOME ROOF INSULATION REPAIRS
The Contractor was directed to delete 1,380 square feet of digester dome roof insulation repairs at Treatment
Plant No.2. The Contract Drawings required roof insulation repairs to be performed on digesters C, D, E, F.G,
and H but field Inspection of the existing dame insulation found a portion of the repairs to be unnecessary. This
Rom of work was negotiated with the Contractor pursuant to Section 10b(B)2(a)of the General Provisions.
(Reference:PCH No.23)
CREDIT THIS CHANGE ORDER ITEM: ($6,376.00)
TIME EXTENSION THIS CHANGE ORDER ITEM: 0 Calendar Days
TOTAL COST THIS CHANGE ORDER: $40,069.00
TOTAL TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days v
Page 7 of 8
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
10844 ELLIS AVENUE,P.O. BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advanco Constructors C.O.No.: Five(5)
Division of Zum Constructors. Inc. Date: May 24, 1995
Job: Electrification of Pump Drives at Reclamation Plant No. 1.Job No.P11-36-1: Security and
Landscaping Element of Miscellaneous Improvements to Facilities at Plant No. 1.Job No. P7-38-1:
Miscellaneous Imorovements to Facilities at Plant No.t.Job P1-38-4: and Miscellaneous
Improvements to Facilities at Plant No. 2. Job No. P243-3
Consultant: John Carollo Engineers
The additional work contained within this Change Order can be performed incidental to the prime work and within
the time allotted for the original Contract and any extensions to the Contract time made by this and all previously
issued Change Orders. It is therefore mutually agreed that no time is required for this Change Order, and no
direct or indirect,incidental or consequential costs,expenses,losses or damages have been or will be incurred
by Contractor, except as expressly granted and approved by this Change Order.
SUMMARY OF CONTRACT TIME
Original Contract Date: January 6,1994
Original Contract Time: 300 Calendar Days
Original Completion Date: November 1,1994
Tine Extension this C.O.: 0 Calendar Days
Total Contract Time Extension: 6 Calendar Days
Revised Contract Time: 306 Calendar Days
Revised Final Completion Due Date: November 7, 1994
Time Subject to Liquidated Damages: Not Applicable
Actual Final Completion Date: Not Applicable
Original Contract Price $ 6,059,364.00
Prev.Authorized Changes $ 95,653.00
This Change(Add) (Deduct) $ 40,069.00
Amended Contract Price $ 6,195,086.00
Page 8 of 8 b
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
108"ELLIS AVENUE,P.O.BOX 8127
FOUNTAIN VALLEY,CALIFORNIA 92728-8127
CHANGE ORDER
Contractor: Advance Constructors C.O. No.: Five (5)
Division of Zurn Constructors. Inc. Date: May 24, 1995
Job: Electrification of Pump Drives at Reclamation Plant No. 1.Job No. P1-36-1: Security and
Landscaninri Element of Miscellaneous Improvements to Facilities at Plant No. 1.Job No. Pt-38-1:
Miscellaneous Improvements to Facilities at Plant No.1.Job 131-38-4: and Miscellaneous
Improvements to Facilities at Plant No.2.Job No. P243-3
Consultant: John Carollo Engineers
Board Authorization Date: May 24, 1995
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
Submitted by: - corn e t
,;Engineering Manager D to a Construction Map Date
App oved by: S
Director of Engineering a isle
e ering Date Ge al Counsel Date
Accepted by:
ADVANCO CONSTRUCTORS,
DIVISION OF ZURN CONSTRUCTORS,INC.
,,OConftafflor DSte
u
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(b)(8): PDC95-14 Consideration of the following
actions relative to Addendum No. 2 to the
Professional Services Agreement with Lee & Ro
Consulting Engineers, Inc. for preparation of a project report, preliminary design, plans
and specifications and providing construction support services relative to Process Area
Fire Protection Signage and Water Distribution System Modifications at Plant No. 1, Job
No. P"8S, and Process Area Fire Protection, Signage and Water Distribution System
Modifications at Plant No. 2, Job No. P246, providing for additional design services and
construction support services:
(a) Consideration of motion to receive, file and approve the Planning, Design and
Construction Committee certification of the final negotiated fee with Lee & Ro Consulting
Engineers, Inc. for said services.
(b) Consideration of Resolution No. 9551, approving Addendum No. 2 to said agreement
with Lee & Ro Consulting Engineers, Inc. for said additional services, on an hourly-rate
basis for labor plus overhead, plus direct expenses, subconsultant fees and fixed profit,
y/ for an additional amount not to exceed $186,670.00, increasing the total authorized
compensation from an amount not to exceed $523,640.00 to an amount not to exceed
$710,310.00.
Summary
In December 1992, the Boards awarded a Professional Services Agreement to Lee & Ro
Consulting Engineers, Inc. to provide engineering services for the design of process area fire
protection, signage and water distribution system modifications at both plants. This project is
for studies and the preparation of plans and specifications for potable, industrial, reclaimed and
plant (secondary effluent)water systems. The project provides for fire hydrants and water
distribution systems modifications at Plant No. 1; a new potable water pump station, fire
hydrants and water distribution system modifications at Plant No. 2; and signage within the
plants to direct emergency personnel, at a total project cost of$7,675,000.
In January 1994, the Boards approved Addendum No. 1 to the PSA, to switch the design for fire
protection based on using plant water to a design for fire protection based on using city water.
This change was made at the direction of Cities and Health Agencies. Addendum No. 1
provided for additional design services for the additional contract amount of$67,200, for a total
contract price of$523,640.
During the design review process occurring throughout the past year, several ideas were
discovered that would improve the project, facilities, and coordination of changing conditions
imposed by other projects in design and construction. Design changes were also made to meet
�..� requirements of Cities and regulatory agencies. The changes were incorporated into the design
documents at the Districts' request as a method to improve the project. These minor changes
during the design process cumulatively impacted the Consultant's budget when the budget was
evaluated towards the end of the project. Addendum No. 2 is for additional professional
services for these minor design changes, to separate the design into two construction document
sets, and for delays in the project schedule ($77,950); and to increase the construction
coordination and support by the consultant($108,720).
`..
Proposed Proposed
Existing Addendum Amended
Agreement No. 1 Agreement
Engineering Design Services,Direct Labor $470,641.00 $70,202.00 $540,843.00
at Hourly Rates plus Overhead at 155%,
Not to Exceed
Construction Support Services,Direct $0.00 $98,354.00 $98,354.00
Labor at Hourly Rates plus Overhead at
154%,Not to Exceed
Subconsultants Fees $3,574.00 $0.00 $3,574.00
Direct Expenses,Not to Exceed $5,560.00 $2,438.00 $7,998.00
Faced Profit $43,865.00 $15,676.00 $59,541.00
Total Contract,Not to Exceed $523,640.00 $186,670.00 $710,310.00
PDC Committee Recommendation
That the PDC Committee recommend approval of Addendum No. 2 to the Professional Services
Agreement with Lee& Re Consulting Engineers, Inc., re Process Area Fire Protection, Signage,
and Water Distribution System Modifications at Plant Nos. 1 and 2, Job Nos. P1-38-5 and P2-
46, providing for additional design services and construction support services for an additional
amount of$186,670., increasing the total contract amount to $710,310.
Executive Committee Recommendation
The Executive Committee recommends approval of Addendum No. 2 to the Professional
Services Agreement with Lee & Ro Consulting Engineers, Inc., re Process Area Fire Protection,
Signage, and Water Distribution System Modification at Plant Nos. 1 and 2, Job No. P1-38-5
and P2-46, providing for additional design services and construction support services for an
additional amount of$186,670., increasing the total contract amount to $710,310.
06.135e
COUNTY SANITATION DISTRICTS
W ORANGE COUNTY. CALIFORNIA
May 4, 1995 1a Ewe AVENUE
Pa.eox ME7
iaUNIAM VALLEY.nuioPNa EE7EE-6127
otnesa.aui
STAFF REPORT
PDC95-14: Consideration of Motion Approving Addendum No. 2 to the Professional
Services Agreement with Lee & Ro Consulting Engineers, Inc. re Process
Area Fire Protection, Signage, and Water Distribution System Modifications
at Plant No. 1 and Plant No. 2, Job No. Pl-38-5 and Job No. P2416, Providing
for Additional Design Services and Construction Support Services for an
Additional Amount of$186,670, Increasing the Total Contract Amount Not
to Exceed $710,310.
Summary
In December 1992 the Directors awarded a Professional Services Agreement to Lee & Ro
Consulting Engineers, Inc., for the design of Process Area Fire Protection, Signage and Water
Distribution System Modifications at Plants Nos. 1 and 2, Jobs Nos. P1-38-5 and P2-46. This
project is for studies and the preparation of plans and specifications for potable, industrial,
reclaimed, and plant (secondary effluent) water systems. The project provides for fire hydrants
and water distribution system modifications at Plant No. 1; a new potable water pump station,
fire hydrants and water distribution system modifications at Plant No. 2; and signage within the
plants to direct emergency personnel, at a total project cost of$7,675,000.
In January 1994, the Boards approved Addendum No. 1 to the PSA to switch the design for fire
protection based on using plant water to a design for fire protection based on using City Water.
This change was made at the direction of the City of Fountain Valley, City of Huntington Beach
and the State and County Health Departments. Addendum No. 1 provides for additional design
services for the additional contract amount of$67,200 for a total contract price of$523,640.
During the course of the design work for this project, the Districts has been evaluating, with the
help of Ernst &Young, the way in which the Districts has been conducting business. This
evaluation has emphasized that changes in design occur during the design and the Flexibility to
change the PSA is needed to compensate the consultant for their additional work performed.
There are seven directional changes that occurred at advanced stages in the design process
which have impacted the consultants budget:
Job No, P1-38-5
1. Design the routing of 500 feet of new 8-inch potable water pipeline within the tunnels.
Following the direction from the Health Agencies and Cities to place the fire hydrants
on potable water, the engineering concept was to convert an existing section of plant
`..� water piping to potable water in an effort to reuse existing piping in the tunnels. This
plant water piping served minor uses in that section of the tunnels. The Consultant
prepared design drawings for review that used this concept. During a design review
meeting, the Consultant was directed by Engineering to leave the piping in place as
plant water service. This direction was the result of current changes in plant
operations in which the trend became to back up the industrial water system at more
and more uses with plant water. With only a potable water source in the tunnel
section, the risk exists that the potable water pipe would be tied into for a backup to an
industrial water source, causing a cross connection that is in violation of the health
codes. By leaving the plant water piping available for back up uses, this risk is
reduced.
Engineering was also not confident that the disinfection process for the plant water
piping would be adequate to eliminate all microorganism. Microbial residue could
result in regrowth of bacteria in the converted pipe, causing contamination in the
potable water system.
2. Provide a reclaimed water source to the new Wastehauler Station.
The wastehauler station is located near the City Water Pump Station. The design of
the wastehauler station included flush water which was served from the industrial
water line near the City Water Pump Station. The flush water is reclaimed water
unless the reclaimed water is unavailable, then industrial water pumps at the City
Water Pump Station supply city water in the same line. Plant water was not available
in close proximity to the Wastehauler Station.
With the changed condition that fire hydrants were to be served with potable water, the
consultant presented design drawings (before the Wastehauler Station design was
prepared) that converted the industrial water line between the City Water Pump
Station (CWPS) and the tunnel to potable water. The existing potable water line
between the CWPS and the tunnel was too small for fire flow demands. The
consultant was directed to make changes to the piping design to convert the smaller
potable water line to reclaimed water and to connect the Wastehauler Station flush to
the smaller line to be served by reclaimed water. This design change was required to
eliminate a cross connection of potable water in the converted industrial water line to
the wastehauler piping.
3. Revise the design of 480 feel of new 8-inch potable water pipeline within the tunnels
using the alignment of recently abandoned digester gas piping and use the alignment
of the removed digester gas piping for the new potable water piping.
In a section of the tunnels, the consultant designed the potable water piping while
leaving all existing pipe in place.As designed, the pipe would restrict access through
the narrow tunnel passage. Meanwhile,work on other projects had eliminated the
need for digester gas piping in the same tunnel section. The consultant was directed
by Engineering Staff to revise the design to show demolition of the abandoned
digester gas line and installation of the potable water line in that alignment.
Job No. Pt-38-5 and P2-46
4. Incorporate the revisions to the District' Standard Specifications dated September 8,
1994, for electrical work into the detailed plans and specifications.
In September 1994, the Engineering Department issued new revisions to the Districts
`..,/ Standard Specifications which modified electrical and instrumentation sections and
included new standard drawings and guidelines for electrical design. The revision
document is over 100 pages. The consultant was directed by Engineering to
incorporate these revisions into the Detailed Specifications for this project. A change
in VFD pump control philosophy and recent MMI/PLC requirements in support of the
project , Expansion of Existing Computerized Monitoring and Control Systems at
Plants 1 and 2, Job No. J-31 were included in the revision.
Job No. P2-46
5. Coordination of grading and yard piping and electrical power systems for the City
Water Pump Station at Plant No. 2 with two other projects in design.
At Plant No. 2, three projects were in concurrent design by three different Consultants,
under three different Professional Services Agreements. The three project boundaries
were in close proximity to each other and the grading, drainage and electrical systems
between the projects are not addressed in any of the three scopes of work. Lee & Ro
was directed by the Engineering Department to design the grading and drainage for
the common area between all three projects and to supply power to the City Water
Pump Station from the Maintenance Facility. This design included storm water catch
basins and storm water drainage piping.
6. Revise the design to eliminate abandoned digester gas piping in tunnels within Plant
No. 2 and use the alignment of the removed gas piping for the new potable water
`...i piping .
In an area of the tunnel system, the consultant designed the potable water piping
while leaving all existing pipe in place and routing the pipe through a pump room. As
designed, the pipe would cause extra congestion and restrict maintenance access in a
pump room, and require core drilling a hole in a concrete wall. Meanwhile, work on
other projects had eliminated the need for digester gas piping in an adjacent tunnel
section. The consultant was directed by Engineering Staff to revise the design to
show demolition of the abandoned digester gas lines, abandonment and demolition of
another large section of gas piping that was not needed and installation of the potable
water line in one of the demolished pipe's alignment. Due to the complexity of the
piping systems, extensive detailing of the pipe routing was required. The consultant
was also directed to show the replacement and reroute of an old corroded steam line
to allow space for the potable water pipe where changes in pipe direction were
needed.
7. Incorporate the design for grading near the North Scrubbers from another project into
this project.
In the project, Phase 2 Site and Security Improvements at Plant No. 2, Job No.
P2-35-5, a detail was created by Brown & Caldwell Engineers to eliminate a drainage
problem in an asphalt area near the North Scrubber Complex. This location was in the
same location where two underground water lines, a fire hydrant and a hose
connection for reclaimed water were designed by Lee & Ro. Engineering staff
directed Lee & Ro to include the drainage improvement design in their design in an
`' effort to eliminate construction coordination problems in the future. At the time, the
i
t
possibility existed that one contractor would construct the drainage improvements, -
closely followed by another contractor who would dig a trench in the newly improved
asphalt for the water piping.
At the Districts' request, the two design projects were split into separate construction document
sets so that the Plant No. 2 work could be bid along with the Maintenance Facility project.
The project schedule was delayed by Staff which impacted the Consultant's budget. These
delays are a result of the District's staff large workloads.
Additional funds are also sought to increase the construction coordination and support by Lee &
Ro to conform with the Ernst & Young recommendations and the developing guidelines of the
Districts Capital Project Management Improvement recommendation.
The actions appearing on the agenda are to approve Addendum No. 2 for the above additional
work, and adoption of a resolution approving Addendum No. 2 to the Professional Service
Agreement with Lee & Ro Consulting Engineers for Process Area Fire Protection, Signage and
Water Distribution System Modifications at Plant No. 1, Job No. P1-38.5, and Process Area Fire
Protection, Signage and Water Distribution System Modifications at Plant No. 2, Job No. P2-46.
MAJOR COST TABLE
DESCRIPTION: Current Current Current Expended to Date:
8udget(3)• Design Costs Construction
Costs(4)
DESIGN CONSTR �✓
Planning&Studies
Consuftanrs Cost $ 750,000 (1)•$ 633240 $ 78,400 $ 513,023
CSD Design Costs 200,000 200,000 — 166,000
Contractor Costs 6,200,000 (5)• 6,111,807 (4)• — — —
CSD Construction 210,000 — 210,000
Costs
Furnishings and — — —
Equipment(2)•
Agreement Costs — — —
Permit Costs — — —
Contingency @ 10% 620,000 —Total Costs: $7,980,000 $7,019,421
'NOTES:
(1) Includes all approved changes to original PSA
(2) Pumishings and equlpmeM are not comicemod capftal pmject costs ark hence am trot aot ally a pan of the protect design
"constmed on calls. The Detroit,purrAaees fumftum am equipment after construction Is cxrpk antler a separate
contract.
(4) includes a0 approved changes to orig'val 1xido
1 ) IWWes al approved charges to original wM2U y
IS) Canwftaras'esEmate of consWction cast. `�►'
Staff Recommendation
N.." Staff recommend approval of Addendum No. 2 to the Professional Services Agreement with Lee
& Re Consulting Engineers, Inc., re Process Area Fire Protection, Signage, and Water
Distribution System Modifications at Plant No. 1 and Plant No. 2, Job Nos. Pi-38-5 and Job No.
P2-46, providing for additional design services and construction support services for an
additional amount of$186,670, increasing the total contract amount to$710,310.
�.ri .pdw)pdoesvmymna.x
COUNTY SANITATION DISTRICTS
t I OF ORANGE COUNTY, CALIFORNIA
" P.O. BOX 8127,FOUNTAIN VALLEY.CALIFORNIA 92728-8127
10844 ELLIS. FOUNTAIN VALLEY,CALIFORNIA 92706-7018
�14'ae (114)962.2411
May 4,1995
Boards of Directors
County Sanitation Districts of
Orange County
108"Ellis Avenue
Fountain Valley,California 92708
Subject: Certification of Negotiated Fee for Addendum No.2 to the Professional Services Agreement
with Lee&Ro Consulting Engineers,Inc.for the design of Process Area Fire Protection,
Signage and Water Distribution System Modifications at Plant Nos.and 2,Job Nos.P1-38-5
and P2-46
In accordance with the Districts'procedures for selection of professional engineering services,the
Planning, Design and Construction Committee has negotiated the following fee with Lee&Ro Consulting
Engineers, Inc.for Addeneum No.2 for additional engineering services in connection with Process Area
Fire Protection,Signage and Water Distribution System Modifications at Plant Nos. 1 and 2,Job Nos.
`�.✓ P1-38-5 and P2046,on an hourly-rate basis including labor plus overhead, plus direct expenses,
subconsultants,and fixed profit,in an amount not to exceed$188,670.
TRADITIONAL ENGINEERING SERVICES
Existing Agreement as Change per Addendum
Amended No.2 Amended Agreement
Engineenn9 Design Services
Direct Labor(Isurly hoes including
labor Plus overhead at 155%),not to $470,641 $70.202 $540.843
exceed
Construction Support Services
Dirz Labor(hourly rates including
labor plus overhead at 154%).not to $98 354 $98.354
exceed
Direct Expended,not to exceed $5.560 $?436 $7,998
Subconsullants Fees,not to exceed $3.574 $0 $3,574
Fixed Prord $43,865 $15,676 $59,541
Subtotal,Engineering Services,not to
exceed $523.640 $186.670 $710.310
COUNTY SANITATION ISTRI
al ORANGE COUNTY, CALIFORNIAaNI
Boards of Directors 1011C EWE AVENUE
4, 199$ P.U.BOX e127
May FOUWAW VALLEY,CALVORlM 927-1
Page Two 014)ERSE<ft
The Planning, Design and Construction Committee hereby certifies the above final negotiated fee as
reasonable for the services to be performed and that said fee will not result in excessive profits for the
consultant.
/s/John J. Collins /a/Sheldon S.Singer
John J. Collins Sheldon S.Singer
Chair Vice Chair
Planning, Design and Construction Committee Planning,Design and Construction Committee
/a/John D.Linder
John D.Linder
Director of Engineering
Planning,Design and Construction Committee
JDL:jac
P13&51SCLADD142.PSA
`DELI
7[ JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(b)(9): PDC95-20 Consideration of the following actions
relative to Addendum No.4 to the Professional
Services Agreement with John Carollo Engineers for design and construction services,
preparation of operations and maintenance manuals,and training services re Secondary
Treatment Improvements at Plant No. 1,Job No. P1J6,and Secondary Treatment
Expansion at Plant No.2,Job No. P2-42,providing for additional construction support and
programming of process control equipment and computers:
(a) Consideration of motion to receive,file and approve the Planning, Design and
Construction Committee certification of the final negotiated fee with John Carollo
Engineers for said services.
(b) Consideration of Resolution No.9552, approving Addendum No.4 to said agreement
with John Carollo Engineers for said additional services, on an hourly-rate basis for labor
plus overhead, plus direct expenses and fixed profit,for an additional amount not to
exceed $750,215.00, increasing the total authorized compensation from an amount not to
exceed $5,889,150.00 to an amount not to exceed $6,639,365.00.
Summary
In October 1989 the Directors awarded a Professional Services Agreement to John Carollo
Engineers for the preparation of plans and specifications for design and construction support
services to expand the secondary treatment facilities capacity from 46 million gallons per day
(mgd) to 80 mgd at Plant No. 1 and from 75 mgd to 90 mgd at Plant No.2. The design was
subsequently split into four construction projects: one project, Job No. P242-1, is complete; two
projects,Jobs Nos. P1-36-1 and P2-42-2, are under construction at this time. The plans and
specifications for the fourth construction project, Job No. P1-36-2, are complete and are currently
in the bidding process.
This project originally had adequate funds authorized by the Directors, however, additional time
and delay have expended some of these funds for the construction support services originally
detailed in the scope of work. The delays this project has experienced are caused by various
factors. The primary cause for the delay in pursuing construction of the final project has been the
ability of the residents to reduce the amount of wastewater to be treated. Second,the original
scope of work detailed only two construction projects. This work has been split into a total of four
projects. There are some funds left in the construction support portion of work, but there is not
enough for the construction support services needed to complete the work. Additional time and
delays were also attributed to the damage to the Central Power Generation facility engines.
A staff report is attached that explains the additional work in detail and includes the actual and
estimated costs of the project to date.
Following is a summary of the contract costs:
Original Professional Services Agreement Amount $4,997,841
Previously Authorized Changes 891,309
Cost This Proposed Change 750,215
Proposed Amended Agreement Amount $6,639,365
Attached to the Staff Report is a summary table that estimates projects costs to completion.
Proposed 7ddedum Proposed
ExeiM Agreement No.4 Handed Agreement
Enmeeblg services for Ori l scope of work and $4,474=.M $4,474,M2.00
AAdenc om No.1(cored Ybor d holhy rates,plus
wvlaed at 155%),Net to Exceed
Engineering services for Addendum No.2(corecl labor S292,000.00 $292,000.00
ot hoary vales,plue overhead at 161%),not to eaceo0
Erairoeing Servkes for Addendum No.3(duert labor $426,884.00 $426,664.00
d hourly pees,plus werlaad st 172%),not to exceed
Erplmwft Semis for Addereknn No.4(dkra labor $687,d48.00
at hourly holes,plus orerMad d 178%),not fo exceed
subtotal.ENIneerhp services S5,193,146.00 $677,446.00 $5,660,59,1M
Dared Expenses,not to exceed $137,90o.00 $23,000.00 $1 so,90 M
Flood Profit S556,104.00 $49,767.00 $607,671.00
Total Proposed Amended Contract, f5,aB9,150.00 f750,215.00 $6,639,365.00
Net to Exceed
�.r PDC Committee Recommendation
That the PDC Committee recommend approval of Addendum No. 4 to the Professional Services
Agreement with John Carollo Engineers re Secondary Treatment Expansion at Plant No. 1, Job
No. P1-36, and Secondary Treatment Improvements at Plant No.2,Job No. P2-42-2, providing
for additional construction support, and process computer programming services, for an additional
amount of$750,211. increasing the contract amount to$6,639,365.
Executive Committee Recommendation
The Executive Committee recommends approval of Addendum No.2 to the Professional Services
Agreement with John Carollo Engineers re Secondary Treatment Expansion at Plant No. 1,Job
No. P1-36, and Secondary Treatment Improvements at Plant No. 2,Job No. P2-42-2, Providing
for additional construction support, and process computer programming services,for an additional
amount of$750,215. increasing the contract amount to $6,639,365.
OS13a9
COUNTY SANITATION DISTRICTS
n1 ORANGE COUNTY. CALIFORNIA
Y
May 4, 1995 +aA..
eo Box Bon 121 FWMAIH V>LIFY. N FO!24.11111 B$l2B-0+e'
fl1<IB82R�++
STAFF REPORT
PDC95-20: Approval of Addendum No. 4 to the Professional Services Agreement with
John Carollo Engineers re Secondary Treatment Expansion at Plant No. 1,
Job No. P1-36, and Secondary Treatment Improvements at Plant No. 2, Job
No. P2-42
Summary
In October 1989 the Directors awarded a Professional Services Agreement to John Carollo
Engineers (JCE) for the preparation of plans and specifications for design and construction
support services. These services would provide the design to expand the secondary treatment
facilities capacity from 46 million gallons per day (mgd)to 80 mgd at Plant No. 1 and from 75 to
90 mgd at Plant No. 2. This design and construction effort includes extensive structural and
mechanical modifications to existing facilities, expansion of secondary treatment and design of
various miscellaneous support facilities. Job No P1-36-1 is currently under construction and will
make modifications to the Primary Effluent Pump Station that provides primary effluent to the
secondary facilities. Job No. P1-36-2 is in design and near completion. This design will provide
the actual increase of secondary treatment capability. Job No. 132-42-1 is the electrification of
16 pump drives (replacement of internal combustion engines with electric motors) located in
Headworks B and C, the Plant Water Pump Station and Primary Effluent Pump Station. Job
No. P2-42.2 is the secondary treatment expansion. Job No. 132-42-1 has been completed and
accepted by the Boards of Directors. Job No. P2-42-2 is currently under construction and is
expected to be completed in January 1996.
This design effort began in January 1989. The Boards have approved three addenda 10 the
project to date. Addendum No. 1 included additional fees for. (1) design services to realign and
replace the land portion of the 78-inch outfall 120-inch pipe, provide rehabilitation of the scum
collection of the existing secondary clarifiers to match the new darifiers being constructed under
Job No. P1-36-1 and, (2)the additional design for a new field laboratory and satellite control
station required by the Master Plan. Additional fees approved by the Boards for Addendum
No. 1 totaled $180,232. Addendum No. 2 included: (1) modifications to the existing air diffusion
headers which will improve the efficiency of the system, (2) provide an automatic influent control
system to reduce operator intervention in the process, (3) modify the return activated sludge
flow pumping and piping system to enhance the treatment process, and (4) modify the plant
effluent pump station to improve operational Flexibility. Addendum No. 2 increased the design
contract by$303,680. Addendum No. 3 included 8 items as follows: (1) provide design
services to replace the main sewage pumps in Headworks C, (2) provide services to investigate
and limit the approved suppliers of the Headworks C pumps to allow only the highest of quality
systems, (3) modify the equipment hatch in Headworks C for maintenance purposes, (4) modify
the secondary clarifier structure to accommodate an observation platform, and (5) replace the
4.� Flow meter installed under Job No. Pt-33 to accommodate the influent control system noted
above, (this was not included in the above noted addendum because this meter was changed in
construction, after the addendum was negotiated), (6) relocation and increasing the size of the t'
waste sidestream pump station to accommodate higher Bows, (7) modify the structure of the
Plant No. 1 new secondary clarifiers to accommodate future covers, and (8) modify the Plant
No. 1 aeration system to replace existing internal combustion engines that are no longer
available for use. This addendum is currently under consideration by the Boards. If approved
this will increase the design contract by$407,392.
Due to less than expected wastewater Bow being treated by the Districts and the effect of the
construction problems with the Central Generation Facility at Plant No. 2, the construction
project on Job No. P1-36-2 has been delayed. The original scope of work negotiated in 1989
anticipated a scheduled beginning of construction for January 1992. The current schedule
estimates the beginning of construction in September 1995. Because of the additional scope
design items being added, and the extended duration to the contract, additional fees for the
Consultant have been requested by staff.
The first item associated with this addendum includes additional construction support services
that have been detailed by the original scope of work. These additional items will allow the
construction management staff to better utilize the designer for review of shop drawings, attend
routine meetings that would not usually include the designer, and provide additional services for
answering detail questions by the contractor during the course of construction. These items
have been suggested by the Ernst&Young review of the existing system to be included in
future projects. The amount of additional funds allocated for this work do not necessarily need
to be expended by the staff. If the Consultant is needed for services, the funds will be available
for use.
In addition to extending the construction services as noted above, it is proposed that John U
Carollo Engineers be responsible for the actual software programming of the field
programmable logic controllers, man machine interface and modifications to the central
computer software. In past construction projects the Districts have found that the interpretation
of the contract documents by the construction contractor was not always compatible with the
operational requirements of the Operations staff. To resolve this problem, it is suggested that
the design Consultant is in a better position to provide the process programming needed to
better meet the needs of the Districts. The construction documents will be written to require the
contractor to provide all hardware and data links. The Districts' Plant Automation Group will
provide all computers. The Consultant will provide the software configuration. This is also in
response to the recommendations by Ernst & Young to have the design engineer more involved
with the construction and start-up of the project.
Staff Recommendation
Staff recommends approval of Addendum No. 4 to Professional Services Agreement with John
Carollo Engineers re Secondary Treatment Expansion at Plant No. 1, Job No. P1-36-2, and
Secondary Treatment Improvements at Plant No. 2, Job No. P2-42, providing for additional
construction services and additional programming of computer equipment, for an additional
amount of$750,215, increasing the total contract amount to not exceed $6,639,365.
wpdaclpdc951mnyNai 20.s r \�
COUNTY SANITATION DISTRICTS
1 � OF ORANGE COUNTY, CALIFORNIA
' P.O. BOX 8127, FOUNTAIN VALLEY, CALIFORNIA 92728-8127
10844 ELLIS, FOUNTAIN VALLEY, CALIFORNIA 92708-7018
4'I4ae cW`� (714)962-2411
May 3, 1995
Boards of Directors
County Sanitation Districts of
Orange County
10844 Ellis Avenue
Fountain Valley, CA 92708
Subject: Certification of Negotiated Fee for Addendum No. 4 to Professional Services
Agreement with John Carollo Engineering Services in Connection with Secondary
Treatment Improvements at Plant No. 1, Job No. P1-36, and Secondary
Treatment Expansion at Plant No. 2, Job No. P2-42
In accordance with the Districts' procedures for selection of professional services, the Planning,
Design and Construction Committee has negotiated the following fee with John Carollo
Engineers for Addendum No. 4 to the Professional Services Agreement for Secondary Treatment
Improvements at Plant No. 1, Job No. P1-36, and Secondary Treatment Expansion at Plant No.
2, Job No. P2-42, providing for modifications and changes to enhance the treatment process, on
`.,✓ en hourly-rate basis, including labor plus overhead, plus direct expenses, and fixed profit, in an
amount not to exceed $750,215.00, as follows:
Proposed Proposed
Existing Addendum Amended
Agreement No.4 Agreement
Engineering Services for Original Scope of $4,474,262.00 $4,474,262.00
Work and Addendum No. 1 (direct labor at
hourly rates,plus overhead at 155%),Not
to Exceed
Engineering Services for Addendum No.2 $292,000.00 $292,000.00
(direct labor at hourly rates,plus overhead
at 161%),not to exceed
Engineering Services for Addendum No.3 $426,884.00 $426.884.00
(direct labor at hourly rates,plus overhead
at 172%),not to exceed
Engineering Services for Addendum No.4 $667,448.00
(direct labor at hourly rates,plus overhead
at 178%),not to exceed
Subtotal, Engineering Services $5,193,146.00 $677,448.00 $5,860,594.00
Direct Expenses,not to exceed $137,900.00 $23,000.00 $160,900.00
�,,,.✓ Fired Profit $558,104.00 $49,767.00 $607,871.00
Total Proposed Amended Contract, $5,889,150.00 $750,215.00 $6,639,365.00
Not to Exceed
COUNTY SANITATION DISTRICTS
W ORANGE COUNrY. CALIFORNIA
Boards of Directors
May 3, 1995 16 RLM AV WE )
Page Two Ro WX8127
EOUNfYN VLLLFT.C<{IFOPNIG 9t)dB� '
nuiaszzan
The Planning, Design and Construction Committee hereby certifies the above final negotiated fee
as reasonable for the services to be performed and that said fee will not result in excessive
profits for the consultant.
lsVohn J. Collins %s\Sheldon S. Singer
John J. Collins Sheldon S. Singer
Chair Vice Chair
Planning, Design and Construction Committee Planning, Design and Construction Committee
\sXJohn D. Linder
John D. Linder
Director of Engineering
Planning, Design and Construction Committee
"� '�" COUNTY SANITATION DISTRICTS
' J Z eve.qp��J.
t j. .�. 9
` `a '" OF ORANGE COUNTY, CALIFORNIA
P.O. BOX 8127.FOUNTAIN VALLEY.CALIFORNIA 92728-8127
l 10844 ELLIS.FOUNTAIN VALLEY,CALIFORNIA 02708.7018
'gyp 44'ZGE GOU@ (714)962.2411
May 16, 1995
To the Chairman and
Members of the Joint Boards of Directors
Subject: Board Letter
The following is an update on some of the things that are happening at the Districts that are important
to staff and management and that I think might be of interest to you. If you have questions on any of
the items, please give me a call.
New Directors'Orientation and Plant Tour
All of you should have received a memorandum from John Cox about the upcoming orientations and
plant tours scheduled for Saturday,June 3 and June 17. If not, or if you have not returned your
response memorandum, please Contact my secretary, Jean Tappan at(714)962.2411, extension
2001, as soon as possible.
Enchanter Boat Tour for Directors
Because the Districts discharges its treated wastewater offshore, R is essential to either own a boat or
contract for boat services. Owning a boat involves Construction Costs,maintenance Costs and
maintaining staff positions for a captain and crew. The Districts choose to Contract with Enchanter,
Incorporated for boat services.
The Enchanter IV is a 40-foot wooden hull vessel weighing 15 tons powered by a 671 Detroit diesel,
single screw-powered engine. The vessel utilizes Differential G.P.S. and Loren C navigational
systems which allow the captain to position the vessel within 10 meters of any given Coordinates.
Captain Tom Pesich spends a considerable amount of time making the Enchanter IV not only
functional but attractive. The General Manager is extending an Invitation to interested Board members
to view our contract vessel,the Enchanter IV, and take an approximately three-hour cruise. Weekday
or weekend days could be arranged depending upon the number of Directors interested and their
schedules. Three to four Directors could be accommodated at a time. The cruise would depart from
the Balboa Boat Basin in Newport Harbor mid morning and return around noon. Irwin Haydock,
Compliance Manager, has volunteered to accompany the cruise party to demonstrate ocean bottom
sampling techniques. Fred O'Brien, Marine Monitoring section of the Environmental Sciences
Laboratory,will demonstrate water Column profiling using the Seabird CTD(Conductivity,Temperature
and Density)profiling sampler.
Interested Directors should contact the General Manager's office for dales and directions to the boat
dock.
Offshore Pollution TestinoBeach Monitoring: On Again-And Always Was
Attached is a copy of an article from the May 4, 1995 Los Angeles Times. The article announces that
Orange County officials are arranging to resume water testing that was halted by the bankruptcy.
The Sanitation Districts monitor 15 miles of the Orange County coastline, from Boise Chica to Corona
Del Mar, for bacterial Contamination. We have been doing this for more than 30 years as a Condition of
`....� our ocean discharge permit issued by the EPA and the State of California. During approximately the
same length of time,the County electively performed bacterial monitoring at 120 locations in the
harbors and beaches of Orange County to determine Compliance with slate and federal Coliforrn
bacteria standards.
Chairman and Members of
the Joint Boards of Directors
Page 2 of 4
May 18, 1995
Unfortunately,the ravages of deUining budgets and, most recently,the bankruptcy had caused the
County to sequentially cut back and finally eliminate this program. As you have no doubt seen in the
newspapers,there has been considerable discussion and controversy over the County's decision.
Recently,the Sanitation Districts have been approached for help. We will. By adding 9 new
monitoring stations to our existing program of 17 stations with a net cost increase of approximately
$5.200 per year,the Sanitation Districts will cover the coastal area from Seal Beach (the Los Angeles
County line)to Main Beach in the City of Laguna. We will provide the results of our monitoring
program to the County so that the Environmental Health Care Agency can continue to be informed
about the bacterial quality of the beach recreational areas of"our'stretch of Orange County. Our
actions and those of other public agencies, coupled with the partial refunding of the County's water
quality testing program activities should provide sufficient monitoring to protect public health in the
recreational marine waters off Orange County.
Status of Short-Tenn Sale and Buy Back of Air Pollution Emission Reduction Credits
The Army Corporation of Engineers has had a recent shift in their plans so that they no longer have the
need to"lease"some of our Emission Reduction Credits(ERCs) for reactive organic gases(ROG).
Please see the attached letter from the Director of Technical Services, Ed Torres, for further detail.
Deletion of Molecular Microbiology Section
The Molecular Microbiology Section of the Laboratory will be deleted effective with the Fiscal Year
1995-96 budget. This action will result in the deletion of one Senior Scientist, one Scientist and two
Senior Laboratory Analyst positions.
The employees wnrently holding these positions may request voluntary demotions to any previously
held positions for which they remain qualified and competent to perform the duties and responsibilities.
The potential order of layoffs has been outlined, based on total seniority with the Districts,for each of
the above-affected classifications in full accordance with the Memorandum of Understanding (MOU).
In addition,these employees have been offered a severance plan that provides salary and job
networking benefits that will soften the impact of this action.
The names of all individuals laid off or reduced will be placed on a Recall List for the classification they
held for a period of two years from July 1, 1995. When a vacancy occurs for such a position, and the
individual is qualified and competent to perform the duties and responsibilities,they will be extended
an offer of reemployment, again in full accordance with the MOU.
Meeting of the Ad Hoc Committee of the Planning. Design and Construction Committee
On Friday,April 28, 1995, a meeting was held of the Ad Hoc Committee of the Planning, Design and
Construction Committee.
The Committee was shown a video of tunnels used for storage in order to question the Ernst and
Young findings on the need for a new Plant No. 2 Warehouse, and toured various buildings. Current
and future space requirements were presented based on existing and projected personnel. The
decision was made to demolish the old lab. A decision was also made to have staff present a draft
scope of work for the next Ad Hoc Committee meeting,to be held June 2 at 4:00 p.m., for professional
services to study and determine how best to utilize existing space as well as planning for future space
usage.
Chairman and Members of
the Joint Boards of Directors
�...' Page 3 of 4
May 18, 1995
CASA Reaulatory Reform Bill Deferred to Next Year
The California Association of Sanitary Agencies'(CASA's) regulatory reform bill,SB 739 by Senator
Richard Polanoo,was heard for the second time on April 25, in the Senate Committee on Natural
Resources. Six votes were needed for passage;the bill received 5 for and 4 against. Senator Polanco
was granted reconsideration and SB 739 will now become a 2-year bill which will not move again until
January.
Contractor's Fuel Spill at Slater Avenue Pump Station
Attached is a memorandum from the Districts'Safety and Emergency Response Specialist, Dan
Tunnicliff. The memorandum summarizes the spill and the results.
Letter of Support for Assembly Bill 42 (Joe Baca): Hazardous Materials
Attached is a letter from the Southern California Alliance of Publicly Owned Treatment Works (SCAP)
for AS 42, which would coordinate the regulation of hazardous materials.
Los Alamitos County Water District Wants Representation on District No. 3 Board
I have met with Joe Martin, President of the Los Alamitos County Water District. It is the intent of the
Water District to seek representation on our Board. I have given Mr. Martin guidance on the
appropriate steps to take and he will be addressing a letter to the Districts to discuss their views with
District 3 members following the regular meeting of the Joint Boards on June 28.
Purchase of Natural Gas
The Operations division is finalizing bid documents to purchase natural gas forthe Central Power
Generation System from a privatizer. Contractors for the transmission of gas to each plant are being
finalized with the Gas Company. Staff estimates a minimum $100,000 per year savings.
Annual Check-= Outfall Pipe Valves and Gates are A-OK
The staff of Operations and Maintenance has just completed exercising and testing the 7 ocean outfall
pipe valves and gates located at Plant No.2 in Huntington Beach. The exercising is done annually to
ensure reliability.
Look Ma: No More Chlorine
Plant No. 1 has become a chlorine-free (liquid and gas) plant which improves the safety of the plant
staff and the public. Plant No. 2 is in the process of eliminating chlorine by September of this year.
Improving Outfall Diffuser Performance
To improve the performance of the outfall diffuser, Undersea Graphics has cleaned the 20 plugged (or
partially plugged) ports on the Districts' 120-inch ocean outfall. The treated wastewater is discharged
through 500 3-inch to 4-inch ports.
House Passes Clean Water Act Reauthorization
On May 16,the House of Representatives voted 240-185 to approve H.R. 961, the"Clean Water Act
'a.r� Amendments of 1995' Please see the attached memorandum from Robert P. Miele.
Chairman and Members of
the Joint Boards of Directors
�✓ Page 4 of 4
May 18, 1995
Secondary Treatment Plant Improvements at Plant No 1 Nearly Underway
Bids were opened May 16 for the construction of Secondary Treatment Improvements at Plant No. 1,
Job No. P1-36-2. The project consists of construction of new facilities to enhance secondary treatment
performance and retrofit existing equipment and structures. There were 8 bids ranging from
$35,291.000 to$40,427,000. The apparent low bid was submitted by Margate Construction Company.
The engineer's estimate was$42,300,000. Margate is an excellent contrector and is presently doing
the Plant No.2 Secondary Treatment Improvements. Award of the bid is expected to occur at the
June meeting of the Boards of Directors when the contract and paperwork are complete.
Example of a Permit-Required Confined Space Entry into the No. One Sume Tower
Please see the attached letter from Jeff Reed,the Districts'Security Supervisor, regarding bulkhead
installation and removal at the No. One surge tower that was a permit-required confined space entry
occurrence.
Daily Pilot Article About"Cranky' Residents
The attached article, like many others, reports the views of inconvenienced citizens. Though their
feelings are valid,the nature of the project and the positive long-term impact it will have on the
community as a whole, must also be held in focus. Nevertheless,there have been some significant
impacts on the citizens(read that our customers) in Costa Mesa. Adverse soil conditions, a deep and
large-diameter line, narrow streets, Impacted commercial properties,tough traffic conditions and a
V.✓ recalcitrant contractor add up to a lot of problems. Our challenge was to adequately respond to the
ever-changing conditions for the sake of the citizens. At times, we fell short. As a result, we are
looking at what resources and discretionary authority we must provide our'front line trooW to respond
quickly and completely. Because the citizens elevated their complaints to discussion in front of the
Costa Mesa City Council,Assistant General Manager Blake Anderson and District No. 6's Chairman
Jim Feryman met with City staff on May 18. Immediate action s were taken to improve roadway
conditions. Blake has follow-up meetings scheduled with the City to meet all of its concems.
Maintenance Department Labor and Benefit Savings
With the reorganization of the Maintenance department, Ed Hodges challenged his staff to redefine the
way they do business. He reports that the first to accept the challenge was the Electrical division.
They have come up with a way to conduct the annual maintenance on the 12,400-volt electrical
distribution system that,when fully implemented this month,will save approximately 1,150 man hours
of overtime per year. This represents a labor and benefit savings in excess of$30,000 per year.
It is my hope to have more success stories such as this in the future to share with you.
Respectfully,
Donald F. McIntyre
General Manager
DFM:cm
JAW PD001GM0FM1B0ARD.LTR052495.
Attachments
ORANGE COUNTY SANITATION DISTRICTS
NEWSPAPER CLIPPINGS
Name of Paper Sectlon Page Date Subject
h Myles B � 5-11 5 OC.
LACUNA BEACH
County Will
Restart Tests
of Offshore
Pollution
With surfers complaining that
the waters at some local beaches
are polluted,Orange County offi-
cials are arranging to resume a
water-testing program that was
halted by the bankruptcy.
The program, which tested
ocean waters from Seal Beach to
San Clemente weekly, will be
cobbled together in what Larry
Paul, manager of the countys
Environmental Management
Agency's coastal division, called
"a rescue formaL"
"We're very, very concerned
about the water quality," Pau
told the Laguna Beach City
Council Tuesday night as surfers,
teachers and doctors described
an increasing number of infer-
. lions bedeviling local swimmers.
"It's a one-year rescue effort."
The program, which was pre-
viously handled by the Orange
County Health Care Agency and
paid by the county's general fund,
was axed after the bankruptcy.
But Pau said the Environmental
Management Agency has decided
m resurrect it.using existing staff
to minimize the cost.
"You want to know if the water
is safe to use,"Pau said Wednes-
day."The'only way to know is to
monitor it, to test it on a regular
basis." The Board of Supervisors
will be asked to endorse the plan
on Tuesday,Paul said.
Members of the Laguna Beach
branch of the Surfrider Founda-
tion, who continued water test-
ing after the county stopped,
have complained that the waters
are polluted,even at the popular
Main Beach.
Local beach water has endured
a series of sewer spills in recent
years and is dirtied by runoff.
much of which Bows to the ocean
from inland cities via storm drains.
—LESLIE EAHNFST
COUNTY SANITATION DISTRICTS
AI ORANGE COUNTY, CALIFORNIA
19 ELLIS GVENUE
Ro.9o.9127
FMNTAIN VALLEY,MLIIORNIA 92729-9127
ntn W-2An
May 15, 1995
MEMORANDUM
To: Don McIntyre, General Manager
From: Ed Torres, Technical Services Department Head
Subject: Status of Short-term Sale and Buy Back of ERCs
The Districts were recently offered an opportunity to contract for the short-term sale
and buy back of reactive organic gases (ROG) emission reduction credits (ERCs) with
the Army Corporation of Engineers (Army Corp.). Currently, the Districts have a
surplus of ROG ERCs. This is because the amount of ROG ERCs the Districts
purchased in 1989 for the Central Power Generation Project exceeded the final
demand.
The Army Corp. was initially interested in purchasing the ROG ERCs from the Districts
for four years to offset their emissions from stationary and portable internal
combustion engines (ICES) for the construction of an earthen dam in Redlands,
Cafrfornia. However, A has recently come to our attention that the Army Corp. has
chosen to install emission control equipment on their stationary and portable ICES
instead of purchasing ROG ERCs. The result of their action has shifted their need for
ROG ERCs to oxides of nitrogen (NO,) ERCs. Unfortunately, the Districts do not have
any NOx ERCs. Therefore, the Districts' opportunity to sell ERCs to the Army Corp.
no longer exists.
In the near future, staff plans to provide a report to the Boards on the Districts' excess
ERCs and what options are available for them. It will be based on new air quality
regulations that might affect where they can be used, and may result in more options
for the Districts. The regulation changes are expected to occur in August 1995. If you
have any questions, please contact me at extension 3500.
EMT/LKH:dk
Ref#540065.mem
V, RICTS p
MS
April 25, 1995
MEMORANDUM
To: Donald McIntyre
General Manager
Through: Terri Josway"\>
Safety and Emergency Response Manager
From: Dan Tunniclift
Safety and Emergency Response Specialist
Re: Slater Avenue Pump Station Fuel Spill
This is a follow up to the March 29, 1995 memorandum regarding the Slater
Avenue Pump Station Diesel Fuel Spill. Details regarding clean up activities are described
in the Hazardous Material Spill Status Report (attached). Water and soil analyses were
completed to determine the effectiveness of the clean up, as well as for characterization
purposes. On Friday, April 7, 1995, the clean up efforts by Colich & Sons were deemed
4.r+ sufficient by representatives from the City of Huntington Beach, the U.S. Environmental
Protection agency, State Department of Fish & Game, and the Orange County Health
Department. Following approval by the Source Control Division, the contaminated water
generated during the clean up was discharged to the Districts' system. Colich & Sons were
demobilized from Central Park by Saturday afternoon, April 8, 1995.
On Tuesday, April 11, 1995, discharge of the dewatering water to the storm
water system resumed and is expected to continue through the month of May. On April 19,
1995, a meeting was held between Colich & Sons and the City of Huntington Beach to
discuss the restoration of Central Park. Colich & Sons agreed to replace a small portion of
grass and repair a small section of curb and gutter in the parking lot.
The exact amount of diesel fuel spilled is still unknown, but it is believed that
between 35 gallons and 200 gallons of diesel fuel was spilled. If you require additional
information regarding this matter please contact me at extension 2143 or Terri Josway at
extension 2140.
Attachment
a.,i
HAZARDOUS MATERIAL SPILL STATUS REPORT
Contractor: Colich & Sons
Site of Spill: Slater Avenue Pump Station
Incident: Diesel Fuel Spill
Date of Spill: March 23, 1995
DATE TIME ACTIVITY COMMENTS
3t23/95 3:00 p.m. Fuel transfer from a 500 gallon above ground storage tank to The diesel fuel entered Slater Avenue and Bowed Into an open
an onsite generator resulted in a diesel fuel spill. and closed channel storm drain running through Central Park
and a housing development. The channel terminates at a
storm water pump station which discharges water to the Bolsa
Chica Ecological Reserve.
4:30 p.m. Huntington Beach Fire Department Hazardous Material At approximately 7:00 p.m.,Ancon Marine, Inc. started
Response Team arrived at the site after receiving a call from a cleanup activities under the direction of the H.B. Public
citizen. A representative from Colich & Sons stated that Works staff. Efforts involved manual clean up of the channel,
approximately 2 gallons of diesel fuel had spilled. The H.B. and the use of sorbant pads and containment booms.
Public Works Hazardous Materials Team was contacted to
assess the damage to the street, storm drains, and park. Colich
& Sons hired Ancon Marine, Inc. to assist in the clean up
activities.
3/24/95 8:00 a.m. CSDOC Construction Inspector finds clean up activities at site. The inspector notified the CSDOC Construction Manager who
then notified CSDOC Safety and Emergency Response staff.
8:45 a.m. CSDOC Safety and Emergency Response staff started an 1The area adjacent to the diesel tank and the generator had
investigation of the incident. An Inspection of the pump been cleaned by Ancon Marine, Inc. prior to inspection.
station and adjacent area was conducted.
9:00 a.m. A meeting and site walk was conducted to survey the extent of The scope and extent of the clean up activities were expanded.
the damage resulting from the spill. A strong odor of diesel The full extent of the contamination was not readily Identified.
fuel was noticeable at various locations throughout the park.
A visible sheen was on the water running through the channel.
1
DATE TIME ACTIVITY COMMENTS
3/24/95 1:00 P.M. A meeting was held to develop a clean up plan with The H.B. Public Works staff requested the removal of all
representatives from H.B. Public Works, H.B. City Attorney's contaminated vegetation and soil in the open channel. The
Office, H.B. Fire Department, Colich & Sons, and CSDOC. pipe section of the storm drain must be steam cleaned.
Discussion included the possibility that an underground storm Sorbant booms were to be placed at strategic locations
water drain pipe may have been contaminated as a result of between the spill site and the storm water pump station.
the spill. This underground pipeline must be inspected to
determine if it was contaminated.
4:00 p.m. The U.S. Coast Guard, State of California Department of Fish The clean up activities continued until 6:00 p.m.
and Game, the Regional Water Quality Control Board visited
the site.
3125/95 7:00 a.m. Clean up activities continued with a reduction in the number Clean up activities in the open channel continued throughout
of clean up staff. the day.
3126/95 No clean up activities. Diesel fuel contamination remained in the channel.
3/27/95 1:00 P.M. A site Inspection was conducted to determine if the clean up The H.B. Fire Department Hazardous Materials Response Team
was progressing and if there were any additional actions collected water samples from the underground drainage pipe
necessary to clean the site. and the channel. The samples appeared to be contaminated.
Clean up activities were not scheduled by Colich.
3/27/95 3:00 p.m. A meeting was held to discuss and outline a remedial action H.B. Public Works expressed concern that clean up activities
plan for the site clean up. Colich & Sons estimated that 35 had been suspended for two days and they outlined minimum
gallons of diesel fuel had been spilled on 3/23/95. clean up requirements for this project. Environmental
consultants working for Colich & Sons proposed a clean up
plan to achieve these requirements and agreed to provide a
written plan by 3/28/95.
2
6
DATE TIME ACTIVITY COMMENTS
3/28195 1:00 P.M. No clean up activity at sire. A meeting was conducted to H.B. Public Works demanded that work begin on 3/29/95 and
review the written plan. continue 24 hours a day until satisfactory completion. The
written plan was discussed. The regulatory agencies again
stated the clean up criteria. One dead duck was found floating
in the channel. If additional wildlife is injured or killed, the
California Department of Fish and Game may take over the
supervision of the clean up effort and charge all expenses back
to Colich & Sons. The Regional Water Quality Control Board
stipulated that sampling must be conducted on the section of
channel between the park and the storm water pump station.
3:30 p.m. Colich & Sons obtained necessary permits from Huntington The clean up activities resume in the park.
Beach.
3/29/95 12:30 p.m. Clean up activities continued in the park. Approximately 50 Ancon Isolated the storm drain system and began steam
fish and frogs were removed from the storm drain system and cleaning and removing debris from the culvert areas. Clean
placed in an adjacent lake. Colich & Sons revised the up activities, 24 hours per day, will continue within the park
remedial action plan. boundaries. It has been estimated that the park clean up will
continue approximately 7 more days. After the park is
completed, the clean up effort will move to the residential area
west of Golden West.
3/30/95 11:00 a.m. An unknown substance was found in the underground storm H.B. Public Works stopped clean up activities to develop a
drain system plan of action to address unknown substance.
3/31/95 9:30 a.m. A meeting was held to discuss remediation of the unknown Colich & Sons removed Ancon from the project and contacted
substance. Colich & Sons presented another revision of the with Laidlaw and ACTI to complete the clean up. Steam
remedial action plan. cleaning of the storm drain system began and the unknown
substance was removed.
4/1/95 8:00 p.m. Steam cleaning of storm drain system was completed by
Laidlaw and ACTT.
4/2/95 No clean up activities.
3
DATE TIME ACTIVITY COMMENTS
413/95 3:00 p.m. Water samples were taken to determine progress. CSDOC's No clean up activities.
Source Control took samples of Baker tanks for potential
discharge of over 300,000 gallons (15 Baker tanks) of water
from the clean up activities. Soil samples were taken to
determine the extent of soil remediation.
4/4/95 No clean up activities. Waiting for analytical data to return from the laboratory.
4/5/95 3:00 P.M. A meeting was held to present the analytical results from the Based on the results, further clean up activities do not appear
samples collected on 3/31/95 and 4/3/95. necessary.
4/6195 1:00 P.M. Additional sampling of unknown substance for further Colich & Sons are waiting to discharge water. They would
characterization. Waiting for results from CSDOC to allow like to begin discharging the water on 4/7/95 in order to begin
discharge. removing equipment from the site. They would like to be
completely finished and out of Central Park by 4/10195.
4/7/95 9:00 a.m. A meeting is scheduled with the State of California Department The clean up efforts by Colich & Sons were deemed complete
of Fish and Game, the Regional Water Quality Control Board, following a study of the analytical data and the consensus of
Orange County Environmental Management Agency, U.S. EPA, the City of Huntington Beach, U.S. EPA, State of California
H.B. Fire Department Hazardous Materials Response Team, Department of Fish and Game, and the Orange County Health
and H.B. Public Works to discuss closure of this incident. Department. The water generated during clean up activities
contained in 14 of the 15 Baker tanks met the requirements for
discharge into CSDOC's system. Discharge of the water began
immediately. The Baker tank containing contaminated water
not meeting CSDOC's discharge standards went to a permitted
treatment facility.
4/8195 6:30 a.m. The discharge of the Baker tank contents was completed.
5:00 P.M. Colich & Sons completed the demobilization at Central Park.
4/11/95 9:00 a.m. Began discharging groundwater from from the dewatering The dewatering project is expected to continue through the
project to the storm water system through Central Park. month of May. A portion of the asphalt on Slater Avenue
impacted by the diesel fuel spill was repaired.
4/19/95 9:00 a.m. A meeting was held between Colich & Sons and Huntington Colich & Sons will replace a small portion of the grass
Beach Public Works to discuss the restoration of portions of impacted during the remedlation, as well as replace a 12 foot
Central Park damaged during the remediation. section of curb and gutter in the Central Park parking lot.
4
SCAP . SCAP
6' APR 191995
nranru,+�l�caua2rxawa
d.r Received'
April 18, 1995 Op�
'Assemblyman Joe Baca \UUr
California State Assembly _
State Capital, Room 3160
Sacramento,-CA 95814
Subject: AB 42 (Baca) : Hazardous Materials - SUPPORT
Hearing Date - April 18, 1995 -
Assembly Committee on Environmental Safety
Dear Assemblyman Baca:
The Southern California Alliance of Publicly Owned Treatment Works (SCAP)would like
to express support for AB 42 (Baca). AS 42 would create a single, statewide process
for regulating accidental releases of hazardous materials without unduly infringing on the
authority of agencies now regulating these activities. The-bill also makes some inroads
towards,reconcilfng,various program requirements.
SCAP is an-organization representing the special districts and cities-involved in the
collection, treatment, reuse,and disposal of wastewater in Southern California. In effect, _
SCAP represents 41 of those agencies, from the largest to the smallest: Since chlorine
is commonly used in-the treatment of wastewater, SCAP members are extremely .f
interested in accidental release regulations as part of efforts to efficiently use chlorine in
the safest manner possible. Clear and consistent requirements ior managing regulated
chemicals would facilitate environmental compliance for SCAP members. ;A,.
_ L l
In addition to creating a statewide regulatory process for accidental releases, the bill also
acdresses some overiapping elements,betwaen the rrenf state Risk Management "
Prevention Plan (RMPP) ' and. CAL/OSHA Process 'Safety Management (PSM)
requirements, as well as potential state administration of USEPA.112r Risk Management
Plans (RMP). In general, the bill accomplishes these objectives by:
Requiring the Office of Emergency Services(OES)ip develop statewide regulation,
governing accidental release;
3029016nft VKiDHmtl.Still 113 _
hr ItNaN0 M TPI )1md 74 6 -
Assemblyman Joe Baca
.April 18, 1995
Page 2
Expanding the existing hazard and operability study requirement to allow hazard.
assessment methods.in PSM; and
Establishing a petition process for addressing regulatory"gaps" or issues relating„
to adequacy of either the statewide program or an individual facility RMPP.
On behalf of SCAP member agencies, I will urge members of the Assembly
Environmental Safety Committee to vote "aye" on AB 42. -Please contact me at (818)
880-4110 if you have any questions.
VVe"rely yours,
Brian W. Whitaker, P.E.
Chairman, SCAP Air Quality Committee
BWW.alw 4 1
c, Members and Consultant to the Assembly Environmental Safety Committee
bc: ` SCAP for distribution to-'Ii Cm ittee M®ntiers �' • -
M1 � - •
To: Blake Anderson, OCSO From: LACSO - Technical Services 5-18 J5 12:04pu 0. 2 nF 2
V'
DATE: Hay 18, 1995
MEMO TO: CASA Federal Legislative & Liaison Committee
FROM: Robert P. Miele
SUBJECT: House Passes Clean Water Act Reauthorization
On May 16, the House of Representatives voted 240-185 to approve H.R. 961,
the "Clean Water Act Amendments of 1995!' The House generally rejected
significant amendments throughout five days of debate. However, the
margin of approval, while large, is fifty votes short of the two-thirds vote
that would be required to override a presidential veto. The U.S.
Environmental Protection Agency, the Office of Management and Budget, and
the Department of Interior have recommended that President Clinton veto
H.R. 961 unless it is amended. The Administration specifically objects to
the wetlands title, including compensation for private property "takings,"
risk assessment and cost-benefit analysis requirements, elimination of
stormwater permit requirements, and provisions that would waive effluent
limitations in certain cases. The watershed management provisions
supported by CASA have not been singled out for opposition.
California SRF Allocation Formula Increased
One floor amendment of interest to CASA would restore the requirement to
base the State Revolving Loan Fund (SRF) allocation formula solely on
population and need. The Subcommittee had modified the allocations under
H.R. 961 to cap any changes to current levels for any state at ten percent.
Under the House-passed bill, California would receive 9.39% of the total
funding provided. The House also accepted an amendment to reduce
authorization for SRF capitalization grants for FY 1996-2000 by $1 billion
and to eliminate authorization for the new nonpoint source SRF. The
House-passed bill would authorize $2.25 billion for the SRF for FY 1996 and
$2.3 billion annually for FY 1997-2000. This would provide California with
approximately $211 million for California in FY 1996 and $215 in each of FY
1997-2000.
Senate Action Expected in Summer
H.R. 961 now goes to the Senate for consideration, where the outlook for
passage is uncertain at this time. Senate Committee on Environment and
Public Works Chairman John Chafes (R-RI) has consistently maintained that
the current Act does not need a complete overhaul. Cha£ee plans to draft a
scaled-down bill this summer that will address wetlands, stormwater,
nonpoint source provisions and funding, according to congressional staff.
Chafes's Senate colleagues are likely to push for broader revisions,
however. Debate within the Environment Committee and on the Senate floor
is likely to be heated. It is expected that any bill passed by the Senate
will be narrower than H.R. 961, leaving considerable legislative drafting for
House-Senate negotiators who will develop a compromise bill.
COUNTY SANITATION DISTRICTS
of ORANGE COUNTY,CALIFORNIA
May 16, 1995 10 ELLIS AVENUE
G.O.60X Bin
\MO./ FOUNTAIN VALLEY,CALIFORNIA M269127
(714)962-2411
M E M O R A N D U M
TO: Gary Hasenstab
FROM: Jeff Reed
RE: Permit-Required Confined Space Entry into the
No. One Surge Tower
On May 12, 1995, Districts' safety staff met with representatives
of Jamison Engineering in order to review their proposed work '
procedures and rescue plan for the bulkhead installation and
removal on the No. One Surge Tower. A Permit-Required Confined
Space Entry was necessary to perform the bulkhead installation
and subsequent removal. The bulkhead was required to prevent
excess leakage.
During the meeting, Districts' safety staff performed a Job
Hazard Analysis with the contractor and reviewed the contractor's
permit entry program. The contractor was informed of all actual
and potential hazards associated with the apace. Safety staff
also made recommendations to the contractor regarding protective
measures used to either control or eliminate the actual or
potential hazards.
The bulkhead installation and removal was performed on May 15 and
May 16 respectively. The only notable occurrence specific to the
permit-required confined space entry were several high hydrogen
sulfide gas readings of about 30 parts per million. The operation
was performed without incident and deemed a success.
cc: Terri Josway
t
arotaos
SPORTS m UPDATE
Mesa brother and = 3 Young girl hit by car _
sister CIF bound a -
® z �4 remains stable IN
STIMIN • s
Serving the Newport-Mesa community since 1907 U Y MAY-
- EWERS ' Project which salted in 1986 and
serves parts of Costa Mesa,
I { - Irvine,Tustin and Santa Ana,Un-
Sewer project -has localF ke It
sidents cranky ONTINUED FROM Al der wi
t will serve this whole area
.r -+Fs _ •e, be in place to collect a deposit and should last for another 50
r. o I a project of such magnitude in . years before we have to
0 Costa Mesa Officials Will meet With sanitation officials' without the proper safety barriers; problem,''Mayor Joe Erickson a city, to prevent similar prob. upgrade.' Under said.
toda to'discuss problems and urge speedy COtn leliOn. busy streets closed arbitrarily; said We've had numerous com- 1 ins from being repeated. Erick- Patrick MWelly, the commu-
Y P g sP Y P piles of sand and dirt that aren't and requested cooperation son said. citations manager for the Orange
'It's awful. It's your worst protected from children- _ a';f]fimbw of times, acid it isn't John Linder,the sanitation dis. County Sanitation District, said
By Carolyn Miller, Staff Writer nightmare come true and it does- '1 don't know why these guys_ ►etngtesolved.' - -` ct's acting director of engineer- he knows residents have been
nit seem to be over,' said Nancy don't just finish (the project),', t,;'EdeJaon said the•cay'ydll be g, said the project started Feb. inconvenienced because of the
COSTA MESA-Replacing old Palme. a 20-year resident of ICor- Palme said. 'It seems like it lot of, rseuding the, contractor hired by 2 1994.and should be completed unusual nature of the project,
sewer lines is a messy business mat Street,located off Baker. 'The it is they dig holes and stanBtAP;e, =1b3' tation district,'Sunland- J fly1996-two months later than which requires digging 30 feet
any way it's done - but residents potholes are like man eaters.' looking in it - these ate'ot¢.rfhr: ; den Bumi Canstruc- a cpected because of the winter deep to place large pipes that are
along Baker and Fairview streets Palme said for more than a dollars.' ..;) ;a, ,.., flm'Co., a bID for the - ce the r , structural connection rob- newly 10[eat in diameter-but it
'Q`=" P Y
never imagined it would be a year, residents and business own- City officials have receiv d+ city ezpanded, Bke city person- 1 ins and allowing time to dean is a critical project.
seemingly endless nightmare ers have had to put up with prob- dozens of complaints nel's,,tima to deal with the traffic m, and repair the fragmented -We are going to do every-
dogging their streets,choking the Isms caused by the Orange Coun- Palme's from residents who h1 congestion and complaints. v reets. thing we can to get an early corn-
air with dust and creating giant ty Sanitation District sewage pro- the area. - "r In the future,a new ordinance Upgrading the sewage system pletion date so the inconvenience
asphalt craters. jest: coratmction holes and gaps 'It's been a long, ongoing jXt''�SEE SEWERS PAGE All iz corporates about five Costa can e a alleviated,- MWeoj said.
esa streets, three of them main "Ile alternative)to the project)u
oroughfazes - Fairview Road, to not have the sewers replaced
arbor Boulevard and Baker on time which could create poten-
S eet. It is the final phase of a }lal public health problems.'
I
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(b)(10): FPC95-16 Consideration of motion approving
Final Draft Investment Policy Statement
prepared by Chandler Liquid Asset Management, Inc. and Callan Associates, Districts'
investment advisors
Summary
Steve Kozak, Financial Manager, and Kay Chandler, the Districts' Investment Advisor, will
present the final draft Investment Policy Statement for consideration by the Committee.
At the March 1995 Finance & Personnel Committee meeting, the Committee considered a
sample Investment Policy Statement prepared by the Districts' Investment Advisor.
The details of developing the attached Investment Policy Statement were discussed at the
Directors' March 18, 1995 Workshop on Financing and Investments; at a working session
with the Districts' Investment Advisors on March 22, 1995; and at the April 1995 Finance,
Administration and Human Resources Committee meeting.
All comments received have been included in the final draft of the Districts' Investment
Policy Statement. Once the permanent investment policy is adopted by the Boards, staff will
review Treasury intemal controls and accounting procedures for distribution of interest
earnings, and will update them as necessary for consistency with the permanent investment
policy. The revised internal controls and accounting procedures will be presented to the
Committee for consideration.
The Districts' team of Investment Advisors has prepared a conservative set of policies and
practices to guide the Districts' permanent investment program in its early stages. The
policies reflect the mandate to manage the Districts'funds prudently and they appropriately
emphasize the goals of safety of principal first, liquidity second and yield last.
FAHR Committee Recommendation
The Finance, Administration and Human Resources Committee recommends approval of
the attached Investment Policy Statement by the Executive Committee and the Joint Boards.
Executive Committee Recommendation
The Executive Committee recommends approval of the attached Investment Policy
Statement by the Joint Boards.
J:IWP000IeSVGa'+'aS13910
COUNTY SANITATION DISTRICTS
OF ORANGE COUNTY
INVESTMENT
STATEMENT
Reviewed and Approved
by
Finance, Administration and Human Resources
Committee
on
May 10, 1995
Adopted
by
Boards of Directors
on
May 24, 1995
1.0 Polic
1.1. This Investment Policy is set forth by the County Sanitation Districts of
Orange County (CSDOC)for the following purposes:
1.1.1. To establish a clear understanding for the Board of Directors,
CSDOC management, responsible employees and third parties of the
objectives, policies and guidelines for the investment of the CSDOC's idle
and surplus funds.
1.1.2. To offer guidance to investment staff and any external
investment advisers on the investment of CSDOC funds (see Appendix
W).
1.1.3. To establish a basis for evaluating investment results.
1.2. CSDOC establishes investment policies which meet its current investment
goals. CSDOC shall review this policy annually, and may change its
policies as its investment objectives change.
2.0 Scope:
2.1. This investment policy applies to all financial assets of CSDOC, except for
the following excluded funds:
2.2. Excluded funds:
2.2.1. CSDOC's Deferred Compensation Plan is invested in
accordance with a separate investment policy, and not in accordance with
this document.
2.2.2. Proceeds of CSDOC's capital projects financing program are
invested in accordance with provisions of their specific bond indentures.
3.0 Prudence:
3.1 The standard of prudence to be used by investment officials shall be the
prudent person standard defined below in Section 3.1.1, and shall be
applied in the context of managing an overall portfolio. Investment staff
acting in accordance with written procedures and the investment policy
and exercising due diligence shall be relieved of personal responsibility for
an individual security's credit risk or market price changes, provided
deviations from expectations are reported in a timely fashion and
appropriate action is taken to control adverse developments.
Page 1 of 11
3.1.1 The Prudent Person Standard: Investments shall
be made with judgment and care—under circumstances then
prevailing—which persons of prudence, discretion and ,J
intelligence exercise in the management of their own affairs,
not for speculation, but for investment, considering the
probable safety of their capital as well as the probable income
to be derived.
4.0 Delegation of Authority:
4.1 Authority to manage CSDOC's investment program is derived from the
California Government Code Sections 53600 et seq. and Sections 53635
et seq. The Board of Directors hereby delegates management
responsibility for the investment program to CSDOC's Treasurer, who
shall establish written procedures for the operation of the investment
program consistent with this investment policy. Such procedures shall
include explicit delegation of authority to persons responsible for
investment transactions. No person may engage in an investment
transaction except as provided under the terms of this policy and the
procedures established by the Treasurer. The Treasurer shall be
responsible for all transactions undertaken by CSDOC's internal staff,
and shall establish a system of controls to regulate the activities of internal
staff and external investment advisers engaged in accordance with
Section 4.2.
4.2 The Board of Directors of CSDOC may, in its discretion, engage the
services of one or more registered investment advisers to assist in the
management of CSDOC's investment portfolio in a manner consistent
with CSDOC's objectives. Such external investment advisers shall be
granted discretion to purchase and sell investment securities in
accordance with this Investment Policy. Such advisers must be registered
under the Investment Advisers Act of 1940, or be exempt from such
registration.
5.0 Ethics and Conflicts of Interest:
5.1 Officers and employees of CSDOC involved in the investment process
shall refrain from personal business activity that could conflict with proper
execution of the investment program, or which could impair their ability to
make impartial investment decisions. Employees and investment officials
shall disclose to the General Manager any material financial interests in
financial institutions that conduct business within this jurisdiction, and they
shall further disclose any large personal financialfinvestment positions the
performance of which could be related to the performance of positions in
CSDOC's portfolio.
Page 2 of 11
6.0 Authorized Financial Dealers and Institutions:
6.1 For investments purchased by CSDOC internal staff, the Treasurer will
maintain a list of financial institutions authorized to provide investment
services to CSDOC, including primary dealers, regional dealers, and
banks. No public deposit shall be made except in a qualified public
depository as established by State law.
All financial institutions which desire to become qualified bidders for
investment transactions must supply the Treasurer with the following:
6.1.1. Audited financial statements for the institution's three most
recent fiscal years.
6.1.2. A statement certifying that the institution has reviewed
CSDOC's Investment Policy and that all securities offered to the Districts
shall comply fully and in every instance with all provisions of the California
Government Code and with this Investment Policy.
Selection of financial institutions and broker/dealers authorized to engage
in transactions with CSDOC shall be at the sole discretion of CSDOC. An
annual review of the financial condition of qualified institutions will be
conducted by the Treasurer.
6.2 Selection of broker/dealers used by external investment advisers retained
by CSDOC shall be at the sole discretion of the investment advisers.
7.0 Investment Categories:
7.1 CSDOC's Treasurer shall develop a five-year cash flow forecast, which
shall be updated quarterly. Based on this forecast, the Treasurer shall
designate from time to time the amounts to be allocated to the Districts'
investment portfolios.
7.2 CSDOC monies invested in accordance with this Policy are divided into
two categories:
7.2.1 Liquid Operating Monies. Funds needed for current
operating and capital expenditures are known as Liquid Operating Monies.
7.2.1.1 The maximum final staled maturity of individual
securities in the Liquid Operating Monies account portfolio
shall be one year from the date of purchase.
Page 3 of 11
7.2.1.2 The average duration of the Liquid Operating
Monies account portfolio shall be recommended by the
Treasurer based on the Districts' cash flow requirements,
but may never exceed 90 days, and shall be reviewed and
approved by the Finance, Administration and Human
Resources Committee.
7.2.2 Long Term Operating Monies. Funds needed for longer term
purposes are known as the Long Term Operating Monies.
7.2.2.1 The maximum final stated maturity of individual
securities in the Long Term Operating Monies account portfolio
shall be five years from the date of purchase, unless otherwise
authorized by the Districts' Board of Directors.
7.2.2.2 The duration of the Long Term Operating
Monies account portfolio shall be recommended by the
Treasurer based on the Districts' five-year cash flow forecast,
shall be reviewed and approved by the Finance, Administration
and Human Services Committee, and shall be updated as
needed.
7.2.2.3 The duration of the Long Term Operating
Monies account portfolio shall never exceed 120% of the
duration as established in accordance with Section 7.2.2.2.
7.2.2.4 The duration of the Long Term Operating
Monies account portfolio shall never be less than 80% of the
duration as established in accordance with Section 7.2.2.2
8.0 Obiectives:
8.1 The primary objectives of CSDOC's investment program are, in priority
order:
8.1.1. To preserve capital.
8.1.2. To provide liquidity for operating expenses and capital
requirements.
8.1.3. To earn a total rate of return commensurate with the first two
goals.
Page 4 of 11
9.0 Authorized & Suitable Investment Transactions:
All investments shall be made in accordance with Sections 53600 et seq. of the
Government Code of California and as described within this Investment Policy.
Permitted investments under this policy shall include:
9.1.1 Securities issued by the US Government or an agency of the US
Government and fully guaranteed as to payment by the US Government
or agency of the US Government. Investment in mortgage-backed bonds
and CMOs is not governed by this Section 9.1.1, even if such bonds are
issued by agencies of the US Government. See Section 9.1.12 for
conditions of purchase for CMOs. See Section 9.1.2 for conditions of
purchase of mortgage-backed securities.
9.1.2 Mortgage-backed securities issued by an agency of the US
Government, provided that the slated final maturity of such securities does
not exceed five (5) years from the date of purchase.
9.1.3 Commercial paper rated a minimum of P1 by Moody's Investor Services
(Moody's) or Al by Standard & Poor's Inc. (S&P) provided that (a) the
maturity does not exceed 180 days from the date of purchase; (b) the
issuer is a corporation organized and operating in the United States with
assets in excess of$500 million; (c) no more than 15% of the portfolio is
invested in commercial paper, except that a maximum of 30% of the
..✓ portfolio may be invested in commercial paper, so long as the average
maturity of all commercial paper in the portfolio does not exceed 31 days.
9.1.4 Banker's acceptances issued by institutions the short term obligations of
which are rated a minimum of P1 by Moody's or Al by S&P provided that
(a) the acceptance is eligible for purchase by the Federal Reserve System
(b) the maturity does not exceed 270 days, and (c) no more than 40% of
the total portfolio may be invested in banker's acceptances.
9.1.5 Medium term (or corporate) notes issued by corporations organized and
operating within the United States or by depository institutions licensed by
the United States or any state and operating within the United States, the
long term obligations of which are rated at least WA by S&P or W" by
Moody's. No more than 30% of the portfolio may be invested in eligible
medium term or corporate notes.
9.1.6 Shares of mutual funds investing in securities permitted under this policy
and under California Government Code Section 53601. Such funds must
either (1) attain the highest ranking or the highest letter and numerical
rating provided by not less than two of the three largest nationally
recognized rating services, or(2) have an investment adviser registered
with the Securities and Exchange Commission with not less than five
Page 5 of 11
years of experience investing in the securities and obligation authorized
under this policy and under California Government Code Section 53601,
and with assets under management in excess of$500 million. The
purchase price of such shares may not include any commissions.
Investment in mutual funds may not exceed 15% of the total portfolio.
9.1.7 Certificates of deposit:
9.1.7.1 Secured (collateralized) time deposits in banks meeting
the following criteria: (a) in good standing with the California State
Collateral Pool; and (b) having a net operating profit in the two most
recently completed fiscal years.
9.1.7.2 Negotiable certificates of deposit (NCDs) issued by
financial institutions which shall have long term debt rated A- or higher by
S&P or A3 or higher by Moody's; or have short term debt rated at least Al
by S&P or P1 by Moody's; or as otherwise approved by the Districts'
Board of Directors.
9.1.8 Taxable or tax-exempt municipal bonds issued by the State of
California or its subdivisions. Such securities must be rated "A-" or higher
by S&P or"A3" or higher by Moody's, or as otherwise approved by the
Districts' Board of Directors.
9.1.9 The State of California Local Agency Investment Fund (LAIF). `..
9.1.10 The Orange County Investment Pool.
9.1.11 Collateralized mortgage obligations (CMOs) issued by agencies of the
US Government with a maximum stated final maturity of five years and
asset-backed securities rated "AAA" by S&P and "Aaa" by Moody's, with
a maximum final stated maturity of five years. Securities eligible for
purchase under this section shall be issued by an issuer having a rating
on its unsecured long tens debt of"A" or higher. Combined purchases of
CMOs and asset-backed securities as authorized under this section may
not exceed 20% of the CSDOC's portfolio.
9.1.12 Repurchase agreements collateralized with securities eligible for
purchase under this policy maintained at a level of at least 102% of the
market value of the repurchase agreements. Collateral securities shall be
delivered to a third party safekeeping agent or to CSDOC's custodian
bank
Page 6 of 11
9.1.13 Reverse repurchase agreements provided that
v 9.1.13.1 Generally, no more than 20% of CSDOC's portfolio shall be
invested in reverse repurchase agreements, and there shall be no long-
term reverse repurchase agreements unless otherwise authorized by the
Districts' Board of Directors.
9.1.13.2 The maximum maturity of reverse repurchase agreements
shall be 90 days.
9.1.13.3 Reverse repurchase agreements shall mature on the exact
date of a known cash flow which will be unconditionally available to repay
the maturing reverse repurchase.
9.1.13.4 Proceeds of reverse repurchase agreements shall be used
solely to supplement portfolio income or to provide portfolio liquidity, and
shall not be used to speculate on market movements.
9.2 Sales of CSDOC-owned securities in the secondary market may incur
losses in order to improve the risk or return characteristics of the portfolio,
to prevent anticipated further erosion of principal or when trading for
securities that result in an expected net economic gain to CSDOC.
9.3 If securities owned by the CSDOC are downgraded by either Moody's or
S&P to a level below the quality required by this Investment Policy, it shall
be the CSDOC's policy to review the credit situation and make a
determination as to whether to sell or retain such securities in the portfolio.
If a decision is made to retain the downgraded securities in the portfolio,
their presence in the portfolio will be monitored and reported monthly to
the CSDOC General Manager, the Finance, Administration and Human
Resources Committee and Board of Directors.
10.0 Diversification Requirements.
10.1 There is no limit on investment in securities issued by or guaranteed by
the full faith and credit of the U.S. government.
10.2 No more than 20% of the portfolio may be invested in securities of a single
agency of the U.S. government, which does not provide the full faith and
credit of the U.S. government.
10.3 No more than 5% of the portfolio may be invested in securities of any one
issuer, other than the U.S. government or its agencies.
10.4 No individual holding shall constitute more than 5% of the total debt
outstanding of any issuer.
Page 7 of 11
10.5 No more than 40% of the portfolio may be invested in banker's
acceptances.
10.6 No more than 15% of the portfolio may be invested in commercial paper,
except that 30% of the portfolio may be so invested so long as the
average maturity of all commercial paper in the portfolio does not exceed
31 days.
10.7 No more than 30% of the portfolio may be invested in medium tens
(corporate) notes.
10.8 No more than 15% of the portfolio may be invested in mutual funds.
10.9 No more than 30% of the portfolio may be invested in negotiable
certificates of deposit.
10.10 No more than 10% of the portfolio may be invested in eligible municipal
bonds.
10.11 No more than 20% of the portfolio may be invested in a combination of
CMOs and asset-backed securities. CMOs and asset-backed securities
may only be purchased by the Districts' external money managers with
prior Board approval, and may not be purchased by the Districts' staff.
10.12 No more than the lesser of 15% of the portfolio or the statutory maximum
may be invested in LAIF.
10.13 No more than 15% of the portfolio may be invested in the Orange County
Investment Pool.
10.14 No more than 20% of the portfolio may be invested in repurchase
agreements.
11.0 Safekeepina and Custody:
11.1 All security transactions, including collateral for repurchase agreements,
entered into by CSDOC shall be conducted on a delivery-versus-
payment (DVP) basis.
11.2 Securities will be held by a third party custodian designated by the
Treasurer and evidenced by safekeeping receipts.
Page 8 of 11
a
12.0 Internal Control:
12.1 The Treasurer shall establish an annual process of independent review by
an external auditor. This review will provide internal control by assuring
compliance with policies and procedures.
13.0 Performance Benchmarks and Objectives:
13.1 Overall objective. The investment portfolio shall be designed with the
overall objective of obtaining a rate of return throughout budgetary and
economic cycles, commensurate with investment risk constraints and cash
flow needs.
13.2 The Liquid Operating Monies. The investment performance objective
for the Liquid Operating Monies shall be to earn a total rate of return over
a market cycle which exceeds the return on an index of three-month
Treasury bills.
13.3 The Long Term Operating Monies. The investment performance
objective for the Long Term Operating Monies shall be to earn a total rate
of return over a market cycle which exceeds the return on a market index
selected by the Districts' Finance, Administration and Human Resources
Committee and approved by the Districts' Board of Directors when the
duration of the portfolio is established.
14.0 Reoortina:
14.1 Monthly investment reports shall be submitted by the Treasurer to the
Finance, Administration and Human Resources Committee which shall
forward the reports to the Districts' Board of Directors. These reports shall
disclose, at a minimum, the following information about the risk
characteristics of CSDOC's portfolio:
14.1.1 Cost and accurate and complete market value of the
portfolio.
14.1.2 Modified duration of the portfolio compared to Benchmark.
14.1.3 Dollar change in value of the portfolio for a 1% change in
interest rates.
14.1.4 Percent of portfolio invested in reverse repurchase
agreements, and a schedule which matches the maturity of such reverse
repurchase agreements with the cash flows which are available to repay
them at maturity.
Page 9 of 11
14.1.5 For the Liquid Operating Monies account only, the percent of
portfolio maturing within 90 days.
14.1.6 Average portfolio credit quality.
14.1.7 Percent of portfolio with credit ratings below "A° by any rating
agency, and a description of such securities.
14.1.8 Listing of any transactions or holdings which do not comply
with this policy or with the California Government Code.
14.1.9 Time-weighted total rate of return for the portfolio for the
prior three months, twelve months, year to date, and since inception
compared to the Benchmark returns for the same periods.
14.2 External investment advisers and CSDOC's Treasurer shall meet
quarterly with the Finance. Administration and Human Resources
Committee to review investment performance, proposed strategies and
compliance with this investment policy.
15.0 Investment Policy Adoption:
15.1 CSDOC's Investment Policy shall be reviewed by the Finance,
Administration and Human Resources Committee and shall be adopted by
resolution of the Board of Directors of CSDOC. The policy shall be
reviewed on an annual basis by the Finance, Administration and Human
Resources Committee, which shall recommend revisions, as appropriate,
to the Board of Directors. Any modifications made thereto shall be
approved by the Board of Directors.
15.2 The Finance, Administration and Human Resources Committee shall
serve as the oversight committee for the Districts' Investment Policy and
shall adopt guidelines for the ongoing review of duration, quality and
liquidity of the Districts' portfolio.
Page 10 of 11
APPENDIX A
SUMMARY OF INVESTMENT AUTHORIZATION
�- INTERNAL AND EXTERNAL MANAGERS
SHORT TERM OPERATING FUND
INVESTMENT INTERNAL EXTERNAL
U.S. Treasuries OK OK
Federal Agencies Fixed coupon, fixed mat. OK
Mortgage-backed NO NO
Commercial paper OK OK
Banker's Accept OK OK
Medium Term Notes Fixed coupon, fixed mat.' OK
Mutual Funds Money Market Only" Money Market Only
Negotiable CDs Fixed coupon, fixed mat.' OK
Municipal Bonds OK` NO
LAIF OK NO
OCIP OK NO
CMOs NO NO
Asset-backed NO NO
Repurchase Agree. OK OK
Reverse Re os OK' OK
LONG TERM OPERATING PORTFOLIO
INVESTMENT INTERNAL EXTERNAL
U.S. Treasuries OK OK
Federal Agencies Fixed coupon, fixed mat. OK
Mortgage-backed NO OK
Mutual Funds Money Market Only" OK
Negotiable CDs Fixed coupon, fixed mat.' OK
Municipal Bonds OK' OK
LAIF OK NO
OCIP OK NO
CMOs NO With Board Approval
Asset-backed NO With Board Approval
Repurchase Agree. OK OK
Reverse Re os OK' OK
*With prior approval of the Finance,Administration and Human Resources Committee.
"'Using financial institutions approved by the Finance,Administration and Human Resources Committee.
11WVpOLI WCMHflNVFS?RYb50NE!:f.RY
Pagel 1 of 11
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(b)(11 FAHR95-24 Consideration of Resolution
No. 9553, extending Early Retirement
Incentive Program Provisions for all eligible
Districts' employees.
Summary
On March 8, 1995, the Boards approved an earty retirement incentive program in accordance
with Government Code Section 31641.04 for certain Maintenance Department employees. Five
employees elected to participate in the program, facilitating a major reorganization of the
Department.
Staff believes that extending the early retirement incentive program to the remainder of the
eligible employees would be an effective method to accelerate the organizational change
sought by the Boards and staff.
Gary Hasenslab, Director of Human Resources, will review the attached staff report at the
meeting.
FAHR Committee Recommendation
The Finance, Administration and Human Resources Committee recommends the Executive
Committee approve the following:
1. Support a Board Resolution adopting the provisions of Government Code Section
31641.04 authorizing all eligible Districts' employees to receive two years additional
service credit for retirement purposes.
2. Specify that provisions of the Early Retirement Incentive Program would be effective
May 1 through June 30, 1995, and that the total cost savings of positions filled at a lower
level shall exceed the total actuarial cost of the additional service credit granted and
associated paid leave payoff costs. Specify, for reasons of equity, that individuals retiring
subsequent to March 1, 1995, who were not entitled to the previous retirement incentive,
be credited with two additional years of service, in accordance with this program.
3. For a period of five years, or until such time as the full actuarially determined cost is paid
to OCERS, the Districts' Controller will conduct an annual post-audit to verify that the
savings exceed the actuarial and associated costs attributable to the additional service
credit, and report the findings of that audit to the Finance, Administration and Human
Resources Committee.
Vr�
J:NNPOOC1BaWG&5�13911
rExecutiveittee Recommendation
mmittee recommends the Joint Boards approve the following:
oard Resolution adopting the provisions of Government Code Section
uthorizing all eligible Districts' employees to receive two years additional
it for retirement purposes.
2. Specify that provisions of the Early Retirement Incentive Program would be effective
May 1 through June 30, 1995, and that the total cost savings of positions filled at a lower
level shall exceed the total actuarial cost of the additional service credit granted and
associated paid leave payoff costs. Specify, for reasons of equity, that individuals retiring
subsequent to March 1, 1995, who were not entitled to the previous retirement incentive,
be credited with two additional years of service, in accordance with this program.
3. For a period of five years, or until such time as the full actuarially determined cost is paid
to OCERS, the Districts' Controller will conduct an annual post-audit to verify that the
savings exceed the actuarial and associated costs attributable to the additional service
credit, and report the findings of that audit to the Finance, Administration and Human
Resources Committee.
�:uvwoc�aswceswri aar r
m COUNTY SANITATION DISTRICTS
V AI ORANGE COUNTY, CALIFORNIA
109 EW5 AVENUE
P0.90N9121
�2 FOU W AIN VALLEY.CALRORNIA 92729.9127
P1119623a11
April 27, 1995
STAFF REPORT
EARLY RETIREMENT INCENTIVE PROGRAM REVISITED
DISCUSSION
On March 8, 1995, the Boards adopted Resolution 95-19 providing for implementation
of Government Code Section 31641.04 and the addition of two years service credit to
certain employees in the Maintenance Department otherwise eligible to retire. Five
employees elected to participate in the program, allowing a major reorganization of
the Maintenance Department to occur earlier than would have otherwise been
possible. Cost savings are now anticipated to exceed earlier estimates.
y� Elimination of one level of supervision in the reorganization, and the fact that
individuals retiring from those positions would not be replaced, presented a clear cost
saving advantage in offering the early retirement incentive option in the Maintenance
Department. A further advantage in offering the early retirement incentive option
could come from an enhancement of our ability to bring about organizational change.
Staff believes that District-wide encouragement of accelerated attrition would have a
positive effect on the organizational change sought by the Boards and staff, and
would provide a forceful means of achieving that objective. The potential effect of the
early retirement incentive program on motivating organizational change, when
coupled with other activities that are now occurring, is significant. While the clear cost
savings associated with the Maintenance Department reorganization will not be
experienced, any added cost can be mitigated by holding positions vacant for
approximately six months subsequent to retirement in addition to the increased
organizational efficiencies that would result.
Approximately eight individuals outside the Maintenance Department have expressed
interest in early retirement, while another twenty meet the minimum requirements of
ten years of service and age 50.
r
v
FINANCE AND HUMAN RESOURCE COMMITTEE
Page 2
April 27, 1995
STAFF RECOMMENDATION
1. Based on the above, staff recommends that the Finance and Human Resource
Committee support a Board Resolution adopting the provisions of Government
Code Section 31641.04 authorizing all eligible Districts employees to receive
two years additional service credit for retirement purposes.
2. The Resolution should specify that provisions of the Early Retirement Incentive
Program would be effective May 1 through June 30, 1995 and that the total
cost savings of positions filled at a lower level shall exceed the total actuarial
cost of the additional service credit granted and associated paid leave payoff
costs. The Resolution should also specify, for reasons of equity, that
individuals retiring subsequent to March 1, 1995, who were not entitled to the
previous retirement incentive, be credited with two additional years of service.
3. For a period of five years, or until such time as the full actuarially determined
cost is paid to OCERS, the Districts' Controller will conduct an annual
postaudit to verify that the savings exceed the actuarial and associated costs
attributable to the additional service credit, and report the findings of that audit
to the Finance and Human Resource Committee.
=PERS
Circular Letter Date: December. 22, 1994
Reference No.:
California Public Employees' Retirement System
P.O. Box 942709 Circular
Sacramento, CA 94229-2709 Letter No.: 200-215
(916) 3263420 Distribution: IIB, A
Telecommunicatlons Device for the Deaf
No Voice (916) 3263240 Special:
R
TO: ALL CONTRACTING PUBLIC AGENCIES
SUBJECT: ONE TO FOUR YEARS ADDITIONAL SERVICE CREDIT
Effective January 1, 1995, Government Code Section 20821.6 (added by Chapter 540, Senate Bill
1488) provides authority for contracting agencies, other than schools, to grant one to four years of
additional service credit to eligible employees who retire for service. The additional credit may not
be granted to employees who retire due to a disability or an industrial disability.
This provision is intended to provide a retirement incentive option to public agencies facing potential
employee layoffs due to the current fiscal climate and budget shortfalls. This option will be
available only until June 30, 1997.
The benefit may be provided by adoption of a resolution; no contract amendment is needed. The
requirements, employer cost information and procedures for contracting agencies to grant one to
four years additional service credit and the employee eligibility criteria are enclosed. Contracting
agencies may request the necessary certification documents and the resolution for adoption by their
governing bodies by completing and returning the enclosed request form.
This new provision does not replace the two-years additional service credit provision (Section
20818) which has been available to contracting agencies for many years.
The administrative and member eligibility requirements for the one to four years additional service
credit are quite different from those for the two-years additional service credit and we encourage
agencies to consider both provisions. Please refer to your PERS Procedure Manual for requirement
and cost information on the two-years additional service credit provisions of Section 20818.
If you have questions about this information please call Public Agency Contract Set-vices. Members
with questions regarding benefit calculations should be directed to the nearest PERS Area or Field
Office.
`�7//
KAREEN DEFRANK, ACTING CHIEF
�../ EMPLOYER SERVICES DMSION
PERS-ADM-69-RP (Rev.6191)
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (13)(b)(12): FAHR95-25 Consideration of Resolution
No. 9554, Providing for Classification,
Compensation and Other Terms, Conditions,
Rules and Regulations of Employment of Districts' Employees, and Repealing Resolution
Nos. 79-20 and 79-21, as amended.
summary:
On February 14, 1979, the Boards adopted Resolutions 79-20 and 79-21 providing for
classification, compensation, and other terms, conditions, rules and regulations of
employment. Over the intervening period, each of these resolutions has been amended
several times annually. Additional resolutions have also been written and adopted from
time to time covering new topics or issues. These conditions make it difficult to trace the
authority for certain terms and conditions of employment, or to use the resolutions as a
source of information or guidance. Changes have also occurred in both labor legislation
and law that have necessitated amendment to certain of the provisions.
Staff and General Counsel have reviewed all of the above-mentioned provisions, and
placed them into a single resolution. Language has been modified to conform to current
legal principles and practices without changing the level of entitlement.
FAHR Committee Recommendation
The Finance, Administration and Human Resources Committee recommends adoption of
Resolution No. 95-54 on the basis that there are no substantial changes in the level or cost
of entitlements over previously adopted resolutions.
Executive Committee Recommendation
The Executive Committee recommends adoption of Resolution No. 95-54 on the basis that
there are no substantial changes in the level or cost of entitlements over previously
adopted resolutions.
��wvooc�sswaasosiaerz
5-8-85
RESOLUTION NO. 95-_
PROVIDING FOR CLASSIFICATION, COMPENSATION AND OTHER
TERMS, CONDITIONS. RULES AND REGULATIONS OF EMPLOYMENT
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS OF
COUNTY SANITATION DISTRICTS NOS. 1, 2, 3, 5, 6, 7, 11, 13
and 14 OF ORANGE COUNTY, CALIFORNIA, RELATING TO
THE CLASSIFICATION,COMPENSATION AND OTHER TERMS,
CONDITIONS, RULES AND REGULATIONS OF EMPLOYMENT
OF DISTRICTS'EMPLOYEESAND REPEALING RESOLUTIONS
79.20 AND 79-21, AS AMENDED,AND ALL RESOLUTIONS OR
PORTIONS THEREOF PREVIOUSLY ADOPTED THAT ARE IN
CONFLICT HEREWITH
. ... .. . . . . .......
WHEREAS, the Districts' management representatives have reached agreements, as
evidenced by executed Memoranda of Understanding, with representatives of employee
bargaining units as follows:
EMPLOYEE UNIT MOU DATE MOU PERIOD
�../ Administrative and Clerical 4/06/94 11/26/93 - 11/21/96
Engineering 4106/94 11/26/93 - 11/21/96
Technical Services 4106/94 11/26/93 - 11/21/96
Operations and Maintenance 825194 11/26/93 - 11/21/96
Confidential 11/26/93 - 11/21/96
Professional Group 10/19/94 02/01/94 - 01/31/97
Supervisory Group 10/19/94 02/01/94 - 01/31/97
WHEREAS, the Districts Boards of Directors desire to implement the provisions of the approved
Memoranda of Understanding and to further specify the governing rules and regulations for all
Districts' employees; and,
NOW THEREFOR:
The Boards of Directors of County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13 and
14 of Orange County, California,
DO HEREBY RESOLVE, DETERMINE AND ORDER:
That the following rules and regulations be established to govern classification,
compensation and other terms, conditions, rules and regulations of employment for all persons
except the General Counsel, but including Executive Management employees, employed by the
County Sanitation Districts of Orange County, by and through the Joint Administrative
Organization.
TABLE OF CONTENTS
Article Page
I. Definitions 1
It. Basic Salary Ranges 3
III. Classification/Positions/Salaries 3
IV. Probationary Employees 4
V. Compensation 5
VI. Overtime Pay - Non-Exempt 6
VII. Additional Compensation - Exempt 7
Vill. Shift Differential Pay 8
IX. Standby Pay 8
X. Call Back Pay 8
XI. Working Out of Class Pay 8
XII. Vacation 9
XIII. Sick Leave 9
XIV. Personal Leave 10
XV. Conferral of Leave 11
XVI. Workers Compensation Leave 11
XVII. Jury Duty 11
XVIII. Witness Leave 11
XIX. Military Leave of Absence 12
�.1 XX. Leave of Absence Without Pay 12
XXI. Medical and Family Leave 12
XXII. Bereavement Leave 13
XXIII. Holidays 13
XXIV. Insurance 13
XXV. Deferred Compensation 15
XXVI. Benefits Option Plans 16
XXVII. Executive Management Vehicle Allowance 16
XXVIII. Uniforms 17
XXIX. Retirement 17
XXX. Severance Pay 17
XXXI. Working Hours 17
XXXII. Layoff Procedure 18
XXXIII. Discipline 18
XXXIV. Grievance Procedure 20
XXXV. Problem Solving Procedure 21
XXXVI. Attendance 22
XXXVII. Medical Examination 23
XXXVIII. Light Duty 23
XXXIX. Substance Abuse 23
XXXX. Rideshare Program 24
XXXXI. Nondiscrimination in Employment 26
XXXXII. Sexual Harassment 26
XXXXIII. Smoke-free Work Environment 27
\fto� XXXXIV. Miscellaneous Provisions 27
I. DEFINITIONS
Regular Full-time employees regularly work an 80 hour bi-weekly pay period for an indefinite
period of time. Regular full-time employees are entitled to benefits as set forth in the various
Memoranda of Understanding and elsewhere in this resolution.
Part-time employees regulady work less than 80 hours in a bi-weekly pay period for an
indefinite period of time. Part-time employees are not entitled to benefits.
Limited Term/Temporary employees are assigned to work 80 hours or less in a bi-weekly
pay period for an irregular or indeterminate period of time. Temporary employees are not
entitled to benefits.
Contract employees are those individuals who provide a unique or special service to the
Districts through an independent contractual relationship, and who exercise completely
independent judgement with regard to the performance of the work. Individuals in this
category do not have an employee-employer relationship with the Districts, and are not
entitled to benefits unless specifically provided in their contract.
Non-Exempt employees who are covered by the minimum wage and overtime provisions of
`r..� the Fair Labor Standards Act as amended. Such employees, because of the type of work
that they perform and their earnings level, are subject to receiving overtime pay in addition to
any entitlement otherwise provided for in applicable Memoranda of Understanding or this
resolution..
Exempt employees who are not covered by the minimum wage and overtime provisions of
the Fair Labor Standards Act as amended. Such employees are considered exempt by virtue
of their duties in conformance with the Act's definition of Executive, Administrative and
Professional responsibilities.
Initial Probationary Period includes the first six months of employment with the Districts.
This period is regarded as an extension of the hiring process, and provides an opportunity for
both the employee and the Districts management to assess over a substantial period of time
whether or not the hiring decision was appropriate. Probationary employees become regular
full-time employees upon successful completion of their probationary period and approval
forth as provided by the Director of Human Resource,
Promotional Probationary Period includes either the six months or ninety day period,
depending on applicable MOU provisions, immediately following the date of a promotion. This
period is regarded as an extension of the selection process, and provides an opportunity for
both the employee and the Districts management to assess over a substantial period of time
whether or not the decision was appropriate.
Resignation is a voluntary separation, including: resignation with or without notice; an
unauthorized absence of three or more consecutive working days; failure to return from leave
of absence as arranged; failure to return from layoff upon recall.
Release is a separation in which the employee is not qualified for the type of work assigned and
no other more suitable assignment is available. Release usually results from no fault of the
employee. Employees who are unable to perform satisfactorily during a probationary period will
also be considered as released.
Layoff is a release of employees when funds or work at a specific skill level is no longer
available.
Discharge is a separation in which the employee is removed from the payroll for violation of
standards of employee conduct, violation of safety regulations, documented unsatisfactory job
performance or other proper cause.
Termination date is considered to be the last day actually worked by the employee irrespective
of any additional pay they may receive.
2 `.
It. BASIC SALARY RANGES
Section 1. There are hereby established in the Joint Administrative Organization the basic
salary ranges set forth on Exhibit "A", attached hereto and made a part of this resolution.
III. CLASSIFICATIONS, POSITIONS AND SALARIES
Section 2. There are hereby established in the Joint Administrative Organization the
classifications, number of positions and their respective salary ranges or hourly rates, as set
forth on Exhibit 'B-1" through "B-9" inclusive, attached hereto and made a part of this
resolution, effective on the dates set forth thereon.
Upon the effective date of the agreement with the Orange County Employee Retirement
System to implement the retiree medical health premium offset program, salary ranges for all
employee classifications shall be increased one percent in accordance with the provisions of
Section 46 of this resolution. In addition, salary ranges will be further adjusted in accordance
with the following schedule.
Emolovee Group Exhibit No. Ad . Percent Eff. Date
Administrative & Clerical B-1 0.0 11-26-93
3.0 11-25-94
3.0 11-24-95
Engineering B-2 0.0 11-26-93
�.✓ 3.0 11-25-94
3.0 11-24-95
Technical Services B-3 0.0 11-26-93
3.0 11-25-94
3.0 11-24-95
Operations & Maintenance 13-4 0.0 11-26-93
3.0 11-25-94
3.0 11-24-95
Confidential B-5 0.0 11-26-93
3.0 11-25-94
3.0 11-24-95
Professional B-6 0.0 07-06-94
3.0 07-07-95
3.0 07-05-96
Supervisory 13-7 0.0 07-06-94
3.0 07-07-95
3.0 07-05-96
Executive Management B-8 0.0 07-06-94
3.0 07-07-95
3.0 07-05-96
Part-Time, Hourly and B-8 0.0 11-26-93
Unrepresented 3.0 11-25-94
3.0 11-24-95
3
Section 3. Wage adjustments for employees in the Professional, Supervisory and Executive
Management Groups are awarded from a "merit pool" amount established annually by the 4/
Boards and allocated to each department in an amount proportional to the salary budget of
employees included within the Professional, Supervisory and Executive Groups. This pool
amount is awarded to individual employees based upon their performance as determined by the
Management Performance Review Program. Employees in the Professional, Supervisory and
Management Groups are not entitled to receive wage adjustments as a result of range
adjustments, except to the extent their salary falls outside the range limits. Further, assignment
of individual salaries into the top quartile of"E" ranges is limited to 20 percent of the employees
in the Professional, Supervisory and Executive Management Groups.
Section 4. The General Manager is hereby authorized to employ and assign persons as needed
to occupy the positions established in Section 5 herein and to exercise supervision over all
persons in accordance with the provisions of this resolution and to terminate, for cause, the
employment of any regular full time employee employed under the provisions herein. All other
employees, i.e., probationary, part-time, limited term/temporary and contract may be terminated
at the Districts sole discretion.
Section 5.The current organizational listing of the County Sanitation Districts of Orange County,
Joint Administrative Organization, designated Exhibit "C", and dated July 1, 1993, is attached
hereto and made a part of this resolution. Exhibit "C" sets forth the departments and divisions
of the Joint Administrative Organization and designates the maximum number of authorized
positions in each organizational unit and classifications, except as provided below, and as
subject to amendment from time to time by the Boards of Directors.
The Districts are governed by the provisions of the Federal Fair Labor Standards Act, "FLSA",
and in accordance therewith, after study and evaluation of the duties and responsibilities of all
job classifications do hereby establish those classifications that are within the Executive
Management, Supervisory and Professional Groups all as set forth on Exhibits"""through "B-
9", inclusive, as exempt from the provisions of the FLSA.
If, in the determination of the General Manager, qualified applicants are not available to fill an
open position, the General Manager shall have the authority to fill the position at a lower
classification or pay level until such time as qualified applicants are available.
IV. PROBATIONARY EMPLOYEES
Section 6. All persons employed by the Districts shall be deemed probationary employees for
a period of six months from the date of hire. The probationary period may be extended by
the Districts for cause by advising the employee prior to the expiration of the six- month
period. Said cause shall relate to the need for a further assessment of the individual's
abilities to satisfactorily perform the duties required for their job classification. Probationary
employees are not deemed to be regular, full-time employees until completion of the
probationary period and may be terminated by the Districts at any time during the
probationary period and without cause. Said employees shall serve at the will of the Districts
during this period. In the event of termination of a probationary employee, the employee shall
not be entitled to receive any severance pay.
4
All provisions of this Resolution shall apply to probationary employees, with the exception of the
yam, Article on Severance Pay. Said employees are also not deemed to be members of employee
representative organizations.
V. COMPENSATION
Section 7. Non-Exempt employees shall be compensated at an hourly rate within the salary
range authorized for the classification in which they are employed as set forth in Exhibits 'B-
1" through "B-5" and 'B-9". Exempt employees shall be compensated at a monthly rate within
the salary range authorized for the classification in which they are employed as set forth in
Exhibits "B-6" through "B-8".
Section 8. Salary offers beyond the midpoint of a range require prior approval by the Boards
of Directors for all classifications. New employees who are in classifications represented by
bargaining units other than the Professional or Supervisory Groups who successfully
complete their Probationary Period and are recommended for continued employment as
regular employees are eligible for consideration of a salary adjustment of up to one step
(5.5%) effective on the first day of the pay period that follows the date of completion of the
Probationary Period (normally 26 weeks). The Salary Review date for subsequent annual
reviews is established as the first day of that pay period following the date probation was
successfully completed.
Section 9. Employees other than Professional, Supervisory and Executive Management who
are not at the top of the salary range for their classification are eligible for consideration of an
annual salary adjustment of up to one step (5.5%) on their Salary Review date, provided their
performance satisfactorily meets expectations. Annual performance reviews shall be
completed on a form provided by the Director of Human Resource.
Section 10. Employees who earn a promotion are entitled to a promotional increase of at
least 5.5%, or to the base of the new range, which ever is greater, upon the effective date of
the promotion. If an employee has not successfully completed his or her Promotional
Probationary Period on their Salary Review date, any adjustment resulting from that annual
review will be delayed until such time as the probationary period is completed. Promotions to
classifications not in the Professional and Supervisory Group establish a new Salary Review
date.
Section 11. Employees who are hired into Professional, Supervisory and Executive
Management Group positions with "E" salary ranges shall be offered a salary at or near the
minimum of the range unless their level of background, expertise or prior earnings result in a
requirement for a salary greater than the minimum. The determination of an appropriate
salary should also consider relationships to other employees in the same classification and to
employees supervised, if any.
Employees in "E" range classifications serve a Probationary Period of six months and receive
a comprehensive performance evaluation at the end of that period. Employees who
successfully conclude their probation are eligible for a salary adjustment the subsequent July
in accordance with the provisions of the Management Performance Review Program
5
established by separate action of the Boards of Directors and as amended from time to time.
An annual performance review is completed for all employees in "E" range classifications in v
accordance with the provisions of the Management Performance Review Program. Performance
based salary adjustments occur on the first day of the first pay period in July, and may be
prorated based upon the date of hire, promotion, or last increase in those instances where the
individual has not concluded their probation as of July 1.
Employees in "E"range classifications who earn promotions to a new"E"range classification will
normally be offered a salary below the midpoint of the range that is commensurate with their
level of training and expertise, prior earnings, and in an appropriate relationship to other
employees in the same classification and to employees supervised. The new salary will normally
represent an increase of at least 5.5 percent, but not exceed the third quartile of the range for
the new classification. Employees in "E" range classifications are not entitled to a salary
adjustment atthe conclusion of the Promotional Probationary Period. If the employee's probation
period has not concluded as of July 1,the performance based salary adjustment is deferred until
such time as probation is successfully concluded.
Section 12. In the event the duties and responsibilities of a position are allocated to a lower paid
classification in the course of implementing the findings of a classification study,the salary of the
incumbent of that position shall remain unchanged (Y-rated) in accordance with the following
table:
Years of Service Term of Y-Rate
0 - 3 6 Months
4 - 5 1 Year
6 - 10 2 Years
11 - 20 3 Years
20 or More 4 Years
The Y-rate shall remain in effect until the salary range for the new classification equals or
exceeds the employee's Y-rated salary, or until the term of the Y-rate expires in accordance with
the table above. If the Y-rate expires before the employee's salary falls within the range of the
new classification, the employee shall be placed on the step of the new range nearest but not
more than the Y-rated salary. Employees become eligible for merit increases and range
adjustments when the Y-rate is no longer in effect. Employees who request a voluntary reduction
are not entitled to a Y-rate.
VI. OVERTIME PAY - NON-EXEMPT EMPLOYEES
Section 13. Non-exempt employees who qualify for overtime compensation for work beyond
their normal schedule shall, at the employee's discretion, either be paid one-and-a-half times
their regular rate of pay, or be granted compensatory time off("CTO") at the rate of one-and-
one-half hour for every hour worked for up to 30 hours worked per calendar year. Such CTO
must be scheduled off during the year in which It is earned.
All overtime hours worked in excess of thirty per calendar year shall, at the discretion of
6
Districts' management, either be paid at one-and-one-half times the regular rate of pay, or by
4.� compensatory time off at the rate of one-and-one-half hours for every hour worked. Normally,
employees who accumulate in excess of fifty hours compensatory time off, without regard to the
elective compensatory time off referred to in the preceding paragraph, will be scheduled to take
such time off or be paid for the excess accumulated compensatory time off at the discretion of
the Districts' management. For good reason, the Department Head, with the concurrence of the
Director of Human Resources, may allow compensatory time to be accumulated in excess of fifty
hours.
When an employee's work schedule requires that they work on an observed holiday, the
employee may opt to be paid at two-and one-half times their regular rate of pay for the holiday
or to be paid at one-and one-half times their regular rate and receive an amount of Holiday
Compensatory Time Off equivalent to the number of hours in the shift. Normally, employees that
accumulate in excess of fifty hours of Holiday Compensatory Time Off will be scheduled to take
such excess time off or be paid for the excess accumulated Holiday Compensatory Time Off at
the convenience of the Districts. For good reason, the Department Head, with the concurrence
of the Director of Human Resources, may allow Holiday Compensatory Time Off to be
accumulated in excess of fifty hours.
VII. ADDITIONAL COMPENSATION - EXEMPT EMPLOYEES
Section 14. Employees in the Professional and Supervisory Groups will be eligible to receive
additional compensation at their regular rate of pay for performing extraordinary service of at
least four hours with regard to activities of a prolonged nature involving: major non-
emergency facilities failures or shutdowns; major tie-ins of newly constructed facilities; major
start-ups of new facilities or systems; major special projects or assigned work when a
substantial effort must be expended to meet a compliance date or scheduled deadline.
Employees in the Executive Management, Professional and Supervisory Groups will be
eligible to receive additional compensation at one and one-half times their regular rate of pay
for performing the following extraordinary services: work required by a major facilities failure
or necessity to protect public health and safety caused by an emergency declared as such by
the General Manager or their designee; work which becomes necessary to cover a regularly
assigned shift which falls on an otherwise non-work day or shift.
Written authorization to receive compensation for all such extraordinary service must be
obtained in advance, except in the event such approval is precluded by the nature of the
emergency. The authorization must be signed by the General Manager, a Department Head
or their designee, and set forth the work to be accomplished, the reason such work is
required, the anticipated hours and eligibility for additional compensation. All authorized
extraordinary service time worked must be reported on a form designated by the Director of
Human Resources as well as the employee's time report.
Employees who have received approval for extraordinary service may elect to receive
Compensatory Time Off in lieu of additional compensation on an hour-for-hour basis.
Normally, employees who accumulate in excess of fifty hours of CTO will be scheduled to
take such excess time off at the convenience of the Districts.
... 7
Except for performing extraordinary services as defined above, Professional, Supervisory and
Executive Management Group employees are not entitled to receive any compensation or v
Compensatory Time Off for service rendered beyond their normal work schedule.
Vill. SHIFT DIFFERENTIAL PAY
Section 15. Employees who are assigned to work an a.m. shift of at least seven consecutive
hours, at least four hours of which fall between 0000 hours and 0600 hours, shall receive a
shift differential of $1.25 per hour for all such hours actually worked. Similarly, employees
who are assigned to work a p.m. shift of at least seven consecutive hours, at least four of
which fall between 1800 hours and 2400 hours, shall receive a shift differential of $1.00 per
hour for all such hours actually worked. Employees working 12-hour shifts are entitled to
$1.50 per hour for the a.m. shift and $1.12 per hour for the p.m. shift effective 11-25-94, and
$1.75 per hour for the a.m. shift and $1.25 per hour for the p.m. shift effective 11-24-95.
IX. STANDBY PAY
Section 16. Standby is time during which an employee is not required to be at the work
location or at the employee's residence but is required to be available for immediate return to
work. Standby assignments shall first be made on a voluntary basis. Except for "E" range
employees, an employee placed on standby shall be compensated at the rate of $100 per
week, and will receive Call Back Pay when actually called to work.
X. CALL BACK PAY
Section 17. Except for"E" range employees, when an employee is called back to work by the
Districts' without prior notice, and the employee has completed his or her normal work shift
and left the plant, or when prior notice is given but the work begins on the same day at least
three hours after completion of the regular shift, the employee shall receive a minimum of
three hours of call back pay. The three hours minimum, whether or not actually worked, shall
be paid at the rate of one and one half times the regular hourly rate. Employees who are
called back a second time within a normal shift period are considered to be working for the
duration of that shift.
XI. WORKING OUT OF CLASS PAY
Section 18. Employees who are temporarily assigned by Districts' management to perform
the duties of a higher level classification for a period of at least 200 hours may be eligible for
a one step salary increase, or the first step of the range for the higher level classification,
whichever is greater. The higher rate of pay begins with the 201st hour, and continues until
the assignment ends. Requests for Working Out of Class pay require the approval of the
Department Head and the Director of Human Resources. The 200 hour eligibility period may
be waived at the discretion of the General Manager.
8 �"'
XII. VACATION
`..' Section 19. Except as provided in the Personal Leave Article, regular full-time employees
accrue vacation leave, beginning with the first day of employment, in accordance with the
following schedule:
Years of Service Hours - Biweekly Hours -Annual
In Years 0 through 1 3.08 80
In Years 2 through 4 3.08 80
In Years 5 through 10 4.62 120
In Year 11 4.93 128
In Year 12 5.24 136
In Year 13 5.54 144
In Year 14 5.85 152
In Year 15 and over 6.16 160
Vacation leave begins accruing with the first day of employment, but employees are not eligible
to schedule vacation time off until the completion of one year's continuous service. Vacation
leave may only be utilized in increments of one-half hour or more. Vacation leave is accrued for
all paid hours, including hours actually worked and hours in a paid-leave payroll status. Unless
special approval is granted in advance for good cause by both the employee's Department Head
and the Director of Human Resources, employees may have a maximum accumulation of 200
hours as of the last day of the final pay period in December of each year. In the event an
employee accrues vacation leave in excess of 200 hours, it must be used prior to said December
�..✓ date, All other remaining hours in excess of 200 will be paid to the employee in the first pay
period in January at the employee's then current hourly rate of compensation.
XIII. SICK LEAVE
Section 20. Except as provided in the Personal Leave Article, regular full-time employees
hired prior to November 27, 1981, accrue paid sick leave at the rate of 3.5 hours for each
biweekly pay period of continuous service (91 hours per year)not to exceed 651 hours.
Regular full-time employees hired on or after November 27, 1981, accrue paid sick leave at
the rate of 3.0 hours for each biweekly pay period of continuous service (78 hours per year)
not to exceed 638 hours, beginning with the first day of employment.
Employees may have a maximum accumulation of 651 hours (or 638 hours as provided
above) as of the last day of the final pay period in December of each year. In the event an
employee accrues sick leave in excess of 560 hours, it must be used prior to said December
date. All other remaining hours in excess of 560 will be paid to the employee in the first pay
period in January at a rate of 50 percent of the employee's then current hourly rate of
compensation.
Section 21. Notwithstanding the provisions of Section 20 above, employees may elect
annually to be paid for any unused sick leave hours accrued through the last day of the last
pay period ending in December of each year at their current hourly rate according to the
9
following payoff schedule:
Accrued Sick Leave Hours Rate of Payoff L...�
0-100 0%
101-240 25%
241-560 35%
Section 22. Employees who terminate for any reason other than retirement or death will be
compensated for any accrued and unused sick leave according to the above schedule.
Employees (or their estate)who retire for service or disability or die will be paid at the 50 percent
rate for all accrued and unused sick leave.
XIV. PERSONAL LEAVE
Section 23. Personal Leave is accrued in lieu of any vacation or sick leave benefits by
regular full-time employees in those job classifications currently represented by the
Operations and Maintenance bargaining unit (Exhibit T4"), as provided in an approved
Memorandum of Understanding, or upon expiration thereof, for all paid hours, including hours
actually worked and hours in a paid-leave payroll status, on a bi-weekly basis as follows:
Personal Leave Hours
Years of Service Biweekly Annual
0 through 1 2.31 80' t...�
2 through 4 5.38 140
5 through 10 6.92 180
11 7.23 188
12 7.54 196
13 7.85 204
14 8.15 212
15 and over 8.46 220
Only 60 hours may be taken in the first year; the 20 additional hours will be credited to
the accrual balance following successful completion of one years service.
Section 24. Employees may have a maximum accumulation of 400 hours of Personal Leave as
of the last day of the final pay period in December of each year. In the event an employee
accrues Personal Leave hours in excess of 400, they must be taken as scheduled leave prior
to said December date. All other remaining hours in excess of 400 will be paid to the employee
in the first pay period of January at the employee's then current hourly rate of compensation.
Regular full-time employees (or their estate)who terminate, retire or die will be paid in full at the
employee's then current hourly rate of compensation for all Personal leave hours accrued.
Section 25. Employees who elected to bank accrued sick leave prior to the implementation of
Personal Leave provisions may elect to use such time off for absence due to illness or injury
once 40 consecutive hours of Personal Leave have been used. Employees (or their estate)who
...
10
retire for service or disability or die will be paid at the 50 percent rate for all Banked Sick Leave
hours; an employee who terminates will be compensated for Banked Sick Leave as follows.
Banked Sick Leave Hours Rate of Pavoff
0 - 100 0 percent
101 - 240 25 percent
241 - 560 35 percent
over 560 50 percent
Employees may elect to bank the dollar equivalent of up to 400 hours of Personal Leave accrued
while in a job classification subject to the Personal Leave provisions of the Operations and
Maintenance Memorandum of Understanding upon their promotion or transfer from such
classification. Time subsequently withdrawn from the bank will be charged at the employee's
hourly rate in effect at the time of the withdrawal. Employees who retire or decease will be paid
their Personal Leave Fund balance in full.
XV. CONFERRAL OF LEAVE
Employees may, on a one-time basis and in accordance with the provisions of the Districts'
Policy regarding Conferral of Paid Leave, elect to donate accrued and unused Personal
Leave, Vacation Leave or Compensatory Time Off to an individual employee who has
depleted their own paid leave as a direct result of a catastrophic medical condition. All such
time must be conferred on a form provided by the Director of Personnel.
XVI. WORKERS COMPENSATION LEAVE
Section 26. Employees who are injured in the course of their employment are placed on
Workers' Compensation Leave, and receive wage loss benefits to which they are entitled
under the Workers' Compensation Act. Employees may request to receive prorated Personal
Leave, Sick Leave or Vacation pay to supplement their Workers' Compensation payments in
an amount such that the sum of both is equal to the employee's regular base pay.
XVII. JURY DUTY
Section 27. Employees called for jury duty will be granted a leave of absence with pay for the
actual time spent on jury service, less the amount of any jury duty pay received, exclusive of
mileage. A copy of the jury notice must be provided to the employee's supervisor and the
Human Resource Office. Employees must report for work during their regularly scheduled
work shift when they are relieved from jury duty.
XVIII. WITNESS LEAVE
Section 28. Employees shall be granted leaves of absence to serve as witnesses in
accordance with the provisions of Califomia Government Code Sections 1230 and 1230.1.
"' 11
XIX. MILITARY LEAVE OF ABSENCE
Section 29. In accordance with the provisions of the Military and Veterans Code, employees v
who are recalled to active service in the Armed Forces of the United States, the National
Guard or who are required to fulfill obligations as members of a Military Reserve Unit, will be
granted a Military Leave of Absence. While on Military Leave, employees will be paid their
regular base pay for up to 30 calendar days. Upon an employee's return to the Districts, all
benefit privileges, position, salary and seniority will be restored as if the employee had not
been absent in accordance with federal and state law. Employees who participate in weekend
military drill duty are not eligible for leave with pay for such activity, but may have their
regular work schedule changed to accommodate the required time off based on operational
needs of the Districts.
XX. LEAVE OF ABSENCE WITHOUT PAY
Section 30. Employees may request a Leave of Absence Without Pay for up to one year to
pursue a formal course of study or for other acceptable personal reasons. Requests must be
submitted in writing, and must specifically state the reason for the request and the dates of
anticipated absence. All requests are subject to approval by the employee's Department
Head and the Director of Human Resources.
Section 31. Employees must provide two weeks notice prior to the date they expect to return
from an approved Leave of Absence Without Pay. Employees who do not provide such
notice may not be permitted to return to the same position held prior to the leave period.
Employees who, without notice or explanation, do not return to work on the date specified at
the end of the period will be deemed to have voluntarily terminated.
XXI. MEDICAL AND FAMILY LEAVE
Section 32. Under the provisions of the federal Family and Medical Leave Act of 1993, upon
completing one year of employment with the Districts and at least 1250 hours of service,
employees are entitled to 12 weeks of unpaid family or medical leave in a 12 month period
for three reasons: the birth or adoption of a child; to provide care during a serious health
condition of their child, parent or spouse; or because of the employee's own serious health
condition.
Section 33. In the case of leaves for foreseeable events such as the expected birth of a child
or a planned medical treatment, an employee must provide notice at least 30 calendar days
in advance. For unforeseeable events, notice is requested as soon as need for the leave is
learned or notice is practicable. Employees are entitled to intermittent leaves not to exceed
an aggregate greater than 12 weeks only when such leave is medically necessary to provide
care during periods of serious illness of an employee's child, parent or spouse. Employees
whose spouse is also employed by the Districts are entitled to an aggregate of 12 weeks'
leave during a 12 month period to care for a newly arrived child or sick parent. If the leave is
requested because of the illness of a child or of the other spouse, each spouse is entitled to
12 weeks of leave.
12
Section 34. A request for medical leave should be accompanied by certification from the health
care provider of the child, parent, spouse or the employee who has a serious health condition
indicating: the date the condition began; the probable duration of the condition; appropriate
medical fads regarding the condition; a statement that the employee will be unable to perform
their regular functions because of the need to provide or receive care; and, in the case of
intermittent leave, the dates and duration of the treatments to be given.
Section 35. Employees who take Family and Medical Leave are guaranteed reinstatement to the
same or to a comparable position at the end of the leave period, and continue to receive the
same group health plan coverage and benefits during the leave as if they were continuing to
work. Employees may elect, or Districts'management may require,that paid leave including sick,
vacation, personal, or accrued compensatory time off be applied towards the unpaid Family and
Medical Leave.
XXII. BEREAVEMENT LEAVE
Section 36. An employee who is compelled to be absent from work because of the death or
imminent death of either father, mother, grandparent, foster parent, step parent,
mother-in-law, father-in-law, brother, sister, wife, husband, child, grandchild or stepchild shall
be entitled to a maximum of three working days leave with pay in addition to any other leave
benefits provided herein.
XXIII. HOLIDAYS
Section 37. The days listed below are observed by the Districts as holidays. Regular full-time
employees will receive holiday pay if their entire scheduled work shift immediately preceding
and following the holiday are in a paid payroll status. When a holiday falls on a regularly
scheduled day off for an employee entitled to receive holiday pay the employee shall be
entitled to equivalent time off with pay. When an employee's work schedule requires that they
work on an observed holiday, the employee will be paid at their regular rate of pay for the
holiday, and will also receive overtime pay at the rate of one and one-half times their regular
hourly rate for all hours actually worked.
Lincoln's Birthday Thanksgiving Day
President's Day Day After Thanksgiving
Memorial Day Day Before Christmas
Independence Day Christmas
Labor Day New Years' Day
Veteran's Day Floating Holiday
XXIV. INSURANCE
Section 38. The Districts shall provide medical-health insurance coverage through both
Health Maintenance Organizations and an indemnity plan, which at the Districts' discretion
may be self-funded or insured, in accordance with the level of benefits provided in the plans
13
in effect as of the date of adoption of this resolution, together with life insurance, and disability
insurance for the benefit of regular full-time employees. All insurance coverage shall become
effective on the first day of the month following one full month of employment. An open
enrollment period will be held annually in the month of June.
Section 39, The Districts will contribute up to the following amounts monthly towards the medical
health plans:
Plan Districts' Contribution
NORTHWESTERN NATIONAL LIFE
Employee only $338.62
Employee & 1 dependent $477.92
Full Family $653.96
FHP
Employee only $134.65
Employee & 1 dependent $215.00
Full Family $275.00
KAISER
Employee only $136.62
Employee & 1 dependent $215.00
Full Family $275.00
All costs of group health insurance coverage in excess of the Districts' contribution shall be paid
by the employee.
Section 40. Any change in insurance rates caused by a carrier after 11-25-94 are subject to the
applicable provisions of the various Memoranda of Understanding approved by the Boards of
Directors.
Section 41. The Districts shall provide and pay the full premium for $50,000 term life insurance
on each employee in the Professional, Supervisory and Executive Management Groups, and the
full premium for $15,000 for all other employees.
Section 42. The Districts shall provide a non-work related, short-term disability indemnity plan
that pays up to $336 per week for up to 26 weeks following a fourteen calendar day waiting
period. Employees may request to receive prorated Sick Leave, Personal Leave or Vacation pay
to supplement their short term disability payments in an amount such that the sum of both is
equal to the employee's regular base pay.
Section 43. Al such time that an employee completes five years of service, the Districts shall
provide a non-work related, long-tern disability indemnity plan that pays two-thirds of the
employee's rate of pay in effect at the time of such disability, not to exceed $5,000 per month,
for up to two years, following a 90-day waiting period of continuous disability.
No combination of disability and sick, personal or vacation leave pay shall result in more than
an employee's regular rate of pay. Employees may not receive short-term and long-term
14
disability benefits at the same time. An employee who is otherwise not eligible for Districts' paid
V..� Long Term Disability may purchase such coverage at their own expense.
Section 44. The Districts shall provide dental insurance coverage. Employees shall contribute
the following monthly costs for the Districts' Self-Funded Dental Plan: $0.00 for employee only
coverage; and, $9.00 for full family coverage.
Section 45. The Districts will pay, for employees hired prior to July 1, 1988, two and one-half
months' premium for each year of continuous service of an employee retiring for service, work
or non-work related disability towards the premium costs of coverage for the employee and
eligible dependents under a Districts' medical plan.
Section 46. The Districts reserve the right to unilaterally change plan providers. In the event the
Districts add additional optional insurance plans, the Districts' share of the premium will be the
same as for existing plans as set forth in Section 39 above. In the event the Districts change
underwriters for existing insurance plans, the Districts' share of the premium will be the same
as for existing insurance plans as set forth in Section 39 above.
Section 47. The Districts shall enter Into an agreement with the Orange County Employee
Retirement System (OCERS) to implement the retiree medical health premium offset program
established by the County of Orange wherein the cost of health premiums are offset by$10 per
month for every year of service up to a maximum of 25 years or $250 per month. Upon the
effective date of the agreement, each employee will pay one percent of his or her salary to
OCERS to fund the above program.
Section 48. Employees who have payroll deductions for medical and dental health insurance
premiums shall be entitled to request that their salary be reduced by the amount of those
deductions pursuant to Internal Revenue Code regulations. The amount deducted shall then be
repaid to the employee through the Districts' Reimbursement Program. Participation in this
program does not affect the Districts' contribution to the Orange County Employees Retirement
System.
XXV. DEFERRED COMPENSATION
Section 49. Employees may participate in the Districts' deferred compensation plan, approved
separately by the Boards of Directors, and amended from time to time, subject to all
requirements for participation established by District's management. The minimum deposit
per pay period is $25, and the total annual maximum deposit is $7500 or 25 percent of gross
salary, whichever is less, in accordance with IRS regulations and the Districts' plan.
Section 50. The Districts will contribute towards an employee's Deferred Compensation
Account as specifically provided in District Boards Joint Resolution No. 87-113, which is
summarized as follows:
Districts' Contribution
Classification Level Matching Non-Matching
Gen. Mgr. and Asst. Gen. Mgr. -0- $7500
Department Head 3.0% 3.0%
V.. 15
Districts' Contribution
Classification Level Matchina Non-Matchina
Asst. Department Head 2.0% 2.5%
Executive Management and 1.0% 2.0%
Professional and Supervisory
XXVI. BENEFITS OPTION PLANS
Section 51. Employees in the Professional, Supervisory and Executive Management Groups
who have successfully completed their Probationary Period are entitled to participate in the
Benefits Option Plan. Under the provisions of the Plan, Professional employees will be
reimbursed for up to $500 annually, Supervisory employees up to $1000 annually and
Executive Management employees up to $1250 annually in accordance with applicable
provisions of Memoranda of Understanding approved by the Boards of Directors.
Section 52. Professional Group employees are also entitled to tuition reimbursement of up to
$250 annually for job related courses taken to meet changing job demands and to prepare
for advancement within the Districts.
Section 53. The Benefits Option Plan will be administered on a calendar year basis, and
employees must designate expenditures by December 1 each year for the following year.
Designations may not be modified during the year. Requests for reimbursement of expenses
must be submitted on the appropriate Districts' form. Plan funds that are designated to offset
insurance premium expenses may be paid directly to the appropriate plan provider on a
monthly or pay period basis at the Districts' discretion.
Section 54. Any funds that are not claimed in accordance with provisions of the Benefits
Option Plan will be payable directly to the employee or credited to the employee's Deferred
Compensation Account.
XXVII. EXECUTIVE MANAGEMENT VEHICLE ALLOWANCE
Section 55. In lieu of a leased vehicle for use in the performance of their duties, Assistant
Department heads and above shall be eligible, at the discretion of the General Manager, to
receive a monthly vehicle allowance in an amount equal to $715 if hired prior to August 24,
1993, and $465 per month if hired after that date, except as otherwise authorized by the
Boards, and as amended from time to time. Each employee receiving the vehicle allowance
shall furnish at their cost all transportation needs in the performance of their duties within the
Counties of Orange, Los Angeles, Riverside, San Bernardino, San Diego, Santa Barbara,
Kern and Ventura. Such employees shall also furnish at least the following amounts of
insurance coverage: Bodily Injury $100,000 each person; each occurrence $300,000;
property damage $100,000. Employees receiving this allowance are prohibited from
circumventing the intent and purpose of the allowance by obtaining the regular use of a
District-owned vehicle in the performance of their duties.
16 U
XXVIII. UNIFORMS
Section 56. The Districts shall provide ten uniform pants and shirts, or three lab coats, bi-
weekly at no cost for employees whose duties require that they wear uniforms. Coveralls
shall also be available as required.
Section 57. All employees who are issued uniforms must wear them during the performance
of their regular duties. Other clothing appropriate to the occasion, as determined by Districts'
management, may be worn when attending business meetings. Failure to wear required
clothing, shoes and safety equipment may be cause for disciplinary action.
XXIX. RETIREMENT
Section 56. The Districts and its employees shall participate in the Orange County Employees
Retirement System, wherein all eligible employees are considered members. The retirement
program in effect pursuant to the contract between OCERS and the Districts as of December
2, 1977, shall continue in effect unless amendments to contracts or termination of
membership is effected by the Districts subsequent to meeting and conferring with
recognized employee units concerning such proposed amendments or termination.
Section 59. The Districts shall pay 4.5% of an eligible employee's base salary towards the
employee's required contribution to the Orange County Employees Retirement System in
addition to the Districts' payment of the employer's required contribution. All monies actually
contributed into the retirement system by an employee will be deducted from gross salary for
taxation purposes in accordance with Internal Revenue Code provisions.
XXX. SEVERANCE PAY
Section 60. Employees are required to give a minimum of two weeks written notification when
terminating employment with the Districts. When a full-time regular employee is terminated by
action of the Districts, except for disciplinary cause, the employee will be notified in writing
two weeks prior to the effective separation date. In the event such notification is not given,
the employee shall be entitled to severance pay in accordance with the formula set forth
below:
a. Full-time regular employees shall be entitled to six hours pay for each full
calendar month of continuous employment not to exceed eighty hours pay, or as
may be determined by the General Manager.
b. Employees in temporary or part-time classifications, and employees who are
separated for cause,are not eligible for severance pay under any circumstances.
XXXI. WORKING HOURS
Section 61. The mission of the Districts requires that operations and maintenance activities
"' 17
be caried out on a continuous basis. Administrative and business functions are normally
performed between the hours of 7:30 a.m. and 5:30 p.m. Monday through Thursday, and until \„�J
4:30 p.m. on Friday. Activities and services that involve contact with the public or outside
organizations will be performed during those hours. In addition,individual divisions may schedule
work beyond those hours, subject to approval by the Department Head, to meet specific
operating or service requirements in the most cost effective or efficient manner.
Section 62. For time record keeping and accounting purposes, the work schedule for full-time
employees is established as forty hours per week based on a bi-weekly payroll period of eighty
hours. The actual work periods may be scheduled in shifts of five eight hour days each week
(10/80 schedule), four nine hour days each week and one additional eight hour shift on alternate
weeks (9/80 schedule)or four ten hour days each week(8/80 schedule). Operations employees
may work three twelve hour shifts each week and one additional eight hour shift on alternate
weeks (7/80 schedule). Day shifts typically begin between 6:30 and 7:30 a.m. However, actual
starting and ending times may vary depending on operational requirements of each department.
Work hours may also be varied, subject to minimum staffing requirements, to allow for individual
circumstances such as ridesharing.
XXXII. LAYOFF PROCEDURE
Section 63. If, in the sole discretion of Districts' management, Human Resource reductions
are necessary, layoff order and recall lists will be developed based upon job classification,
priority of function, individual qualifications and seniority within the job classification.
Employees subject to layoff will be provided with notification in accordance with the
provisions of the Worker Adjustment and Retraining Notification Act.
Section 64. Employees in classifications subject to layoff may request a voluntary demotion to
any previously held position for which they remain qualified. Such request must be made in
writing to the Human Resource Department within five days of receipt of the Layoff Notice.
The salary of an employee who voluntarily demotes will be unchanged, except that it may not
exceed the top step of the range for the lower level classification.
Section 65. Recall lists will be developed for all classifications experiencing personnel
reductions, and will be maintained for a period of two years from the date of the layoff.
Individuals will be placed on the list in the inverse order of layoff, so that the last person laid
off is the first recalled. When a vacancy occurs in a classification for which a Recall List
exists, an offer of reemployment will be made to the individual on the top of the list. That
individual must respond to the offer within five days, or the offer will be made to the next
person on the list. An individual who either does not respond or refuses three consecutive
offers will have their name removed from the list.
XXXIII. DISCIPLINE
Section 66. The General Manager is authorized and directed to exercise supervision over all
employees and to impose disciplinary actions, for just cause, upon any person employed
under the provisions of this Resolution. The General Manager shall establish rules and
guidelines pertaining to the procedures governing such actions. The General Manager is
18
authorized to delegate his authority herein to Department Heads, Division Managers, Director
of Human Resources and other management and supervisory employees as the General
Manager deems appropriate.
Section 67. Discipline occurs when any of the following progressive actions are taken for just
cause with respect to any employee: oral reprimand, counseling memo, written warning,
suspension with or without pay,deferral or denial of a merit increase, reduction in pay, demotion
to a classification with a lower top step of pay, or dismissal. Dismissal is the separation from
Districts employment of a non-probationary employee initiated by the Districts for proper cause.
Section 68. A Notice of Intent is not required when the disciplinary action involves an oral
reprimand, counseling memo,written warning or suspension for five or fewer working days(with
or without pay) or deferral or denial of a merit increase.
Section 69. A Notice of Intent is required and will be given to an employee whenever the
disciplinary action involves suspension for more than five working days, reduction in pay,
demotion to a classification with a lower top step of pay or dismissal. The notice shall be given
to the affected employee either by delivery in person or by Certified Mail sent to the employee's
last known address. The Notice of Intent shall indicate the date on which it was personally
delivered or deposited in the mail, which shall be the date of issuance.
The Notice of Intent shall contain a description of the disciplinary action intended, the effective
date of the action, the reasons for the proposed action, and a copy of the charges and materials
upon which the action is based. The Notice shall also provide a statement of the employee's
right to respond, either orally or in writing to the authority initially imposing the discipline, the
person to whom any response must be directed, and the fact that such response must be
received within ten business days of the date of issuance of the notice. The Notice will also
advise the employee of their right to representation.
Section 70. Prior to the effective date of the proposed disciplinary action, the employee will be
given an opportunity to respond either orally or In writing to a management representative with
authority to make an effective recommendation on the proposed action. After review of an
employee's response, the Districts will notify the employee in writing of any action to be taken.
Such action may not involve discipline more severe than that described in the Notice of Intent;
however, the Districts may reduce discipline without further notice.
Section 71. Dismissal shall be preceded by at least one written warning, except in those
situations in which the employee knows or reasonably should have known that the performance
or conduct was unsatisfactory. Such performance or conduct may Involve, but is not limited to:
dishonesty, possession, use, sale or being under the influence of drugs or alcohol, theft or
misappropriation of Districts' property, falsification of Time Records, fighting on the job,
insubordination, acts endangering people or property, or other serious misconduct. The Districts
may substitute documented suspensions with or without pay for written warnings.
Section 72. If a Notice of Intent is upheld and the disciplinary action is imposed, the employee
may request a post disciplinary hearing. The request must be submitted to the Director of Human
Resources within ten business days following the effective date of the disciplinary action (for
suspensions, the effective date shall be the first business day of the suspension). The Director
19
of Human Resources shall schedule a post disciplinary hearing with the General Manager or his
designee. The General Manager, or his designee, may uphold the disciplinary action which has
been taken or may reduce such discipline without the issuance of further notice. The decision
of the General Manager or his designee shall be final.
Section 73. The Districts may place an employee on investigatory leave without prior notice in
order to review or investigate allegations of conduct which, in the Districts' view, would warrant
relieving the employee immediately from all work duties. If, upon conclusion of the investigation,
neither suspension without pay nor dismissal is determined by the Districts to be appropriate,
the employee shall be paid for the leave. Although an investigatory leave may exceed fifteen
business days, if a suspension without pay is determined to be the appropriate discipline, a
maximum of fifteen business days of the investigatory leave period may be applied to such
suspension without pay. If dismissal is determined by the Districts to be appropriate, the entire
investigatory leave period shall be without pay.
Section 74. Disciplinary action documentation shall be placed in the employee's Personnel File
in the Human Resource Office. Counseling memos and warning letters may be removed from
that file twenty four months subsequent to the date of the memo or letter, provided there has
been no reoccurrence of a similar nature during the period.
XXXIV. GRIEVANCE PROCEDURE
Section 75. A grievance is any charge that management has violated a specific provision of a
Memorandum of Understanding or of this resolution. Discipline imposed under under Article
XXXII is not reviewable as a grievance under this procedure. �../
Section 76. A grievance may be brought to the attention of the Districts by an individual
employee or by a recognized employee organization. A grievance may not be brought by the
Districts through this procedure. Grievances brought by two or more employees, and
concerning the same incident, issue, or course of conduct, or multiple grievances brought by
the same employee may, upon mutual agreement of the Districts and an employee
organization, be consolidated for the purposes of this procedure. An employee shall have the
right to be represented at all steps of the Grievance Procedure by any other employee within
the bargaining group or representative of the recognized employee organization. Any
reference to days in this article implies business days.
Step 1. An employee who has a complaint shall attempt to resolve it with their immediate
supervisor within five days of the occurrence of the event giving rise to the complaint.
The supervisor shall attempt to resolve the issues surrounding the complaint, and
respond to the employee within five days.
Step 2. If the grievance is not settled informally at Step 1, it may be presented in writing
to the employee's Department Head or designee.This request for formal review must be
presented on a forth provided by the Districts within five days of the conclusion of Step
1. The written grievance must;
a. Identify the specific management act to be reviewed;
20
b. Specify how the employee was adversely affected;
`..� C. List the specific provisions of the MOU that were allegedly violated, and
state how they were violated;
d. Provide the date of attempts at informal resolution and the name of the
supervisor or individual involved.
The Department Head or his or her designee shall respond in writing to the employee
within ten days after the date the grievance is received.
Step 3. If a grievance is not settled under Step 1 or 2, it may be presented to the
Director of Human Resources for review and written response. The request for formal
review must be presented on a form provided by the Districts within ten days of the
conclusion of Step 1 or 2, and must contain the information specked in Step 2 above.
The Director of Human Resources, or designee, shall respond in writing to the employee
within ten days after the date the grievance is received.
Step 4. If the grievance cannot be resolved under Step 3, it may be presented to the
General Manager within ten days from the date the Step 3 finding was issued. The
General Manager, or designee, shall respond in writing to the employee within fifteen
days after the date the grievance is received. The action of the General is deemed final.
Section 77. General Provisions. An employee shall be given reasonable time off, with advance
approval of his or her supervisor, to investigate and process a grievance. When an employee
is represented by a recognized employee organization, that organization may designate one
employee to investigate and process the grievance.The employee representative shall be given
reasonable time off, with the advance approval of his or her supervisor, to perform this duty.
Time off for investigating and processing a grievance shall be without loss of pay. Absence from
work will be approved only K it does not disrupt the Districts' operations. If the time requested
cannot be provided, another time will be arranged.
Failure of a supervisor, Department Head or other management representative to respond within
the prescribed time limit shall provide a basis for the employee to appeal to the next step. If a
grievance is not presented or appealed within the time limits, it shall be considered settled on
the basis of the preceding response. The Director of Human Resources may be petitioned in
writing to waive the step or time requirements provided sufficient cause exists. Time limits may
also be extended at any step upon mutual agreement of the parties.
XXXV. PROBLEM SOLVING PROCEDURE
Section 78. Employees may bring problems to the attention of Districts' managers through
the Problem Solving Procedure. This procedure was developed to encourage and facilitate
the resolution of employee ooncems in a responsive and fair manner, and may be used to
attempt to resolve issues which may not be subjected to the Grievance Procedure.
Employees should discuss ooncems regarding issues which are not grievabl with their
supervisor as soon as possible. The supervisor will review the situation or decision, and
provide a written response within five days of the date they were notified of the problem.
21
If the problem is not resolved to the employee's satisfaction, they may file a written statement
concerning the problem with the Director of Human Resources within ten days of receipt of the
supervisor's decision. Upon request of either party, a meeting will be held to define issues and
establish the remedies sought. The employee will be provided a written response within ten
days after their statement is received. Time limits may be extended for cause upon mutual
consent of the parties, and the decision of the Director of Human Resources is final.
XXXVI. ATTENDANCE
Section 79. Prompt and regular attendance is required in order to maintain effective and
efficient Districts' operations. For that reason, all employees are expected to report to work
as scheduled unless proper arrangements have been made for authorized absence.
Section 80. Supervisors are responsible for ensuring that employees observe the Districts'
need for prompt and regular attendance. They are also responsible for providing counseling
at each step of this procedure, including referring employees to the Human Resource
Department or Employee Assistance Program for help in dealing with medical, physical, or
personal difficulties related to their attendance problem. All of the facts and circumstances
surrounding an employee's inability to report for work should be considered in the counseling
process, including the employee's performance, overall attendance, reasons for missing work
and prospects for improvement. While the Districts' need for prompt and regular attendance
of all employees is of utmost importance, it is equally important to recognize individual
employee needs in a fair and impartial manner.
Section 81. Employees must notify their supervisor of their inability to report for work as
scheduled as far in advance as possible, and in no case later than the regular start time.
Employees will be considered late, charged with a partial absence, and have their pay
adjusted accordingly if they arrive for work more than fifteen minutes after their start time
unless other arrangements are made. Tardiness is not acceptable from a performance
standpoint, and should be addressed through a program of progressive discipline.
Section 82. Employees may also be charged with a partial absence, and have their pay
adjusted accordingly, if they leave work early. The notification of absence should include a
reasonable explanation and an estimate of when the employee expects to be able to return.
The Districts may require medical documentation for any absence due to illness or injury,
particularly when there is an indication that abuse of time off privileges may exist.
Section 83. An absence will be recorded for all unscheduled Personal Leave time off or sick
leave use. However, absences of more than one consecutive day for the same injury or
illness will be treated as a single occurrence. Once an employee has accumulated five
separate unscheduled absence occurrences within a calendar year, which may involve more
than five days due to absences of more that one day's duration, their supervisor will meet
with them to discuss the reasons for the absences and the Districts' need for regular
attendance. The accumulation of seven occurrences of absence within a twelve month period
will result in a verbal warning. The eighth occurrence will result in a written warning.
Employees who are charged with ten occurrences of absence within the twelve month period
22
will be subject to termination.
Section 84. Employees who have perfect attendance for a period of two consecutive months may
have one absence occurrence removed from their accumulation record for counseling purposes
only. Up to three occurrences may be removed in this manner for a total of six months of perfect
attendance.
XXXVII. MEDICAL EXAMINATION
Section 85. All offers of employment are contingent upon successful completion of a pre-
employment physical examination, including a drug screening test. Offers of employment will
not be extended to individuals who fail to pass the drug screen test. However, such
individuals may be considered for other employment opportunities after a six month period
has elapsed. Examinations are provided by the Districts at no cost to the applicant.
Section 86. When there is reasonable evidence to suggest that an employee is impaired in a
manner which endangers his or her own health or safety, or that of others, the Districts may
require that employee to be examined or evaluated by a health care provider. The purpose of
such examination must be job related. Any examination under this provision will be
conducted on Districts' time and at Districts' expense. An employee may submit an
independent medical opinion regarding his or her condition and addressing his or her ability
to competently perform the duties of their position. This information will be reviewed and
considered by a competent medical authority in arriving at a decision regarding the
individual's continued employment in the position.
XXXVIII. LIGHT DUTY
Section 87. An employee who is released by a physician to perform limited duties because of
a temporary disability may be assigned to light duty at the discretion of the Districts. Light
duty may consist of duties other than those normally performed by the employee. An
employee assigned to light duty shall be paid the regular wage rate for the job classification
held prior to being temporarily disabled.
XXXIX. SUBSTANCE ABUSE
Section 88. The mission of the Districts, and its concern for the safety and well-being of
employees and the public, provide for a strong commitment to maintaining a drug and alcohol
free workplace. In support of that commitment, the Districts will not tolerate the unlawful or
unauthorized manufacture, sale, possession, distribution, use or being under the influence of
a controlled substance or alcohol while on the job or on Districts' property.
Section 89. Any employee who is reasonably suspected of controlled substance or alcohol
use which adversely impacts their job performance or behavior, or who manufactures,
possesses, consumes, sells, or distributes controlled substances or alcohol on Districts'
property or while on Districts' business, will be required to undergo testing for controlled
`" 23
substance or alcohol use. Reasonable suspicion of the use of or being under the influence of a
controlled substance or alcohol may be based on appropriate factors, including excessive
absenteeism or attendance problems, poor work performance or erratic behavior coupled with
one or more of the following signs: bloodshot or watery eyes; very large or very small pupils,
runny nose, excessive perspiration, nausea and vomiting, lack of coordination, slurred speech,
or unpredictable responses to ordinary requests.
Section 90. Employees found to be under the influence of controlled substances or alcohol while
on Districts' property or on Districts' business, or who otherwise violate the Districts' Substance
Abuse Policy, will be placed on a Leave of Absence and referred to the Employee Assistance
Program for evaluation. Return to work will be contingent upon successful completion of a
rehabilitation program and a thorough assessment of the particular circumstances concerning
the abuse. An employee who chooses not to participate in the rehabilitation program, or in the
drug and alcohol screening test, or who tampers with the test specimen, will be subject to
disciplinary action including, but not limited to, termination. Any employee who successfully
completes a rehabilitation program and is subsequently found to be in violation of the Substance
Abuse Policy, will be terminated from employment with the Districts without further rehabilitative
effort.
Section 91. Controlled substances are those substances defined as such in the Federal
Controlled Substance Act or the California Health and Safety Code. All testing procedures will
be in conformance with National Institute on Drug Abuse standards, and will be conducted at a
reasonable time at the Districts' expense.
Section 92. If a Districts' manager or supervisor has a reasonable suspicion that an employee
is under the influence of a controlled substance or alcohol while on Districts' business or on
Districts' property, or otherwise in violation of the Districts' Substance Abuse Policy, they must
refer that employee to the Human Resource Department for a drug and alcohol screening test.
If an employee suspects that another employee is under the influence of a controlled substance
or alcohol in such a manner as to offer concern for the safety and well-being of other employees
or the public, or is otherwise in violation of this policy, that employee has an obligation to
immediately bring the matter to the attention of a Districts' manager or supervisor.
XXXX. RIDESHARE PROGRAM
Section 93. The South Coast Air Quality Management District's Regulation XV requires that
the Districts offer incentives to reduce commute trips and meet ridesharing goals. In
conformance with those regulations, The Boards have, by separate action, as amended from
time to time, adopted the following incentives to encourage employees to rideshare:
1. Compressed bi-weekly work schedules.
2. Allowing flexibility in the establishment of work hours to facilitate vanpool and other
Ridesharing participation.
3. Designation of preferential parking spaces for Rideshare vehicles.
4. Operation of a Vanpool Program offering Districts' provided vans with the following
provisions:
24 �" d
The cost of operating the van would be recovered from the participating employees, with
`+../ the driver paying a reduced amount;
The Districts would subsidize up to three empty seats for up to three months when
employee participation turnover occurs to keep the fares consistent and to give
participants time to recruit new riders;
Prospective new participants will receive one free month as an encouragement for trying
vanpooling (to be subsidized by the Districts);
All participants will be required to sign a Vanpooling Agreement approved by the General
Counsel setting forth the conditions of vanpool participation.
5. Provision of a computerized carpool ridership matching service and routing assistance.
6. Utilization of certain fleet vehicles currently authorized to be driven between home and
work by employees subject to emergency call-out for ridesharing purposes, as practical.
7. Guaranteed Ride Home Program utilizing certain fleet vehicles in the event a Rideshare
participant cannot return home at the normally scheduled departure of their carpool or
vanpool.
8. Installation and maintenance of bike racks at each plant as well as locker room and
shower facilities.
�..✓ 9. Conversion of in-plant vehicles used in Operations and Maintenance activities to
electric power as appropriate.
10. Conversion of fleet vehicles to alternate clean fuel systems as appropriate.
11. Providing additional paid time off: employees Ridesharing at least 60 percent of the time
during a calendar quarter would accrue 4.5 hours of paid time off for that quarter, to be
taken off in the same calendar year; employees Ridesharing at least 90 percent of the
time would accrue 6.75 hours per calendar quarter.
12. A Parking Fee Program will be implemented only if Districts employees are unsuccessful
in meeting SCAQMD mandated Average Vehicle Ridership goals by July 1, 1991, or in
any subsequent quarterly period if such goal is not met. Once the Parking Fee Program
is implemented for failure to meet the SCAQMD mandated Average Vehicle Ridership
goal, it shall thereafter remain in effect.
If the Parking Fee Program is implemented, employees hired subsequent to July 1, 1991,
will be subject to a $30 per month parking fee; employees hired on or prior to that date
will be subject to a monthly parking fee of $15 beginning July 1 of the initial year of
implementation, and increasing to $30 July 1 of the second year of implementation. To
enhance the potential of meeting the SCAQMD requirements, the Districts will make a
reasonable effort to provide an incentive program that encourages employees to
commute by means other than single occupancy vehicles.
25
XXXXI. NONDISCRIMINATION IN EMPLOYMENT
Section 94. The Districts are an Equal Opportunity Employer, and do not discriminate against
any person in matters of employment, application for employment, participation in programs
and benefits, or in the application of rules and regulations with regard to race, ancestry,
color, religion, national origin, sex, sexual orientation, age, veteran status, marital status or
mental or physical disability or citizenship.
XXXXII. SEXUAL HARASSMENT
Section 95. The Districts will not tolerate sexual harassment in the workplace. Sexual
Harassment may include, but is not limited to, any of the following:
1. Sexual favors. Unwanted sexual advanceswhich condition an employment benefit
upon exchange of sexual favors.
2. Hostile work environment. Sexually-based verbal, physical or visual harassment
of such a nature and intensity that it creates an intimidating, hostile or offensive
working environment. Conduct that may result in a hostile work environment
includes, but is not limited to, the following:
a. Sexual epithets, jokes derogatory comments or slurs;
b. Assault, impeding or blocking movement, or any physical interference with
normal work or movement when directed at an individual on the basis of sex; �...�
c. Sexual cartoons, drawings, photographs or derogatory posters.
Any employee who believes that he or she has been the victim of sexual harassment should
immediately report the matter to his or her supervisor or manager, or to any other supervisor or
manager, including the General Manager. Complaints of sexual harassment will be promptly
investigated, and appropriate corrective action will be taken.
Section 96. The Districts will not tolerate any other form of harassment, and is committed to
providing a work environment that is free from unlawful discrimination. In keeping with that
commitment, the Districts maintains a strict policy prohibiting harassment based on race,
religious creed, color, national origin, ancestry, physical or mental disability, medical condition,
marital status,sex, age, sexual orientation, exercise of rights relating to family care leave, or any
other legally protected basis.This policy prohibits unlawful harassment, including verbal,physical
and visual harassment.
Any employee who believes that he or she has been the victim of unlawful harassment should
immediately report the matter to his or her supervisor or manager, or to any other supervisor or
manager, including the General Manager. Complaints of harassment will be promptly
investigated, and appropriate corrective action will be taken.
26
XXXXIII. SMOKE-FREE WORK ENVIRONMENT
Section 97. The Districts endorse and support the right of all employees to work in a healthy
and safe environment free of recognized hazards. In view of the hazards associated with
smoking, and the potentially harmful effect it has on the health and well being of Districts'
employees and their families, smoking is not permitted within Districts' facilities.
XXXXIV. MISCELLANEOUS PROVISIONS
Section 98. The General Manager is authorized to develop and administer written Human
Resource policies and procedures in order to augment, clarify or otherwise provide for the
proper implementation of the provisions of this resolution, and to authorize special
adjustments to avoid or eliminate inconsistencies which may result from a strict application of
the provisions of this resolution.
Section 99. Resolution Numbers 79-20, 79-21 and any other resolutions, minute orders or
portions thereof that are in conflict herewith are hereby rescinded and made of no further
effect on the effective date hereof.
PASSED AND ADOPTED at a regular meeting of the Boards of Directors held this _ day of
1994.
M.✓
•d 27
Br115L31 A
Gr de Scope
p60e1 01 MY lots
V
OreOa
TBCle MSO 1 5 2 0 2 3 A MSG 3 5 4 0 4 5 MoM
..... ........ ........ ........ ........ ........ ........ ........ ........ ..........
1000 7.1612 B.0031 6.2400 4.4069 4.7139 8.0509 9.1676 9.424S 9.6114
1001 11.2373 11.5924 11.1274 12.2723 12.1173 22.1121 13.3096 13.1527 13.9999
1002 12.54S4 12.1211 13.3126 13.1914 14.0901 14.4638 14.8495 15.2312 15.6146
1093 13.5231 13.1365 14.3531 14.7671 15,1822 3S.5961 16.0214 16.425t 16.640S
1004 13.1141 14.0329 14.4501 14.6611 15.2862 25.9024 11.1115 11.6367 11.9536
1001 13.9050 14.3312 14.7573 SS.163S 15.6097 S6.O351 16.4610 11.9861 27.3143
1004 14.1234 14.6273 15.0612 15.4951 15.9290 14.3421 26.7067 17.1301 V.6645
1007 14.2162 14.7239 15.1616 15.5994 11.0211 11.4749 11.1224 17.3304 17.9111
1006 14.6116 15.1371 1S.5065 16.0398 16.4892 11.1345 17.3838 17.1332 11.2625
1000 16.7590 16.2411 16.7241 17.2074 17.4103 16.1731 10.6559 19.1307 19.621S
1010 16.6920 16.3407 16.0354 17.3220 17.8027 16.2954 10.1021 10.2447 11.7554
1011 14.1911 29.1973 17.2830 1).6)97 16.1744 16.6700 11.2657 11.6414 20.1571
1012 16.3049 16.4045 17.3040 17.0036 SB.3031 19.8027 19.3022 11.8012 20.3013
loll 16.4112 11.9203 17.4225 17.1241 26.4261 26.9266 19.4310 19.1331 20.4352
1014 16.9147 17.5011 19.0271 11.5410 19.0705 21.5911 20.1133 20,6349 21.1562
SO1S 19.3432 1).6137 1B.4061 10.9366 11.4170 11.9175 20.5271 21.0584 21.598B
1019 17.7097 10.2477 19.1090 29.3311 21.9731 20.4151 20.9571 21.5000 22.0420
1017 17.6190 18.3149 18.1208 11.4567 20.0016 20.5405 21.0944 21.1403 22.1062
1016 2B.S709 11.1400 11.7092 20.2761 20.9472 21.4113 21.1854 22.5544 13.2235
1011 11.0851 11.6704 20.2590 26.6319 21.4240 12.0005 22.5231 23.2996 23.7431
1020 19.4616 20.0639 20.6056 22.1759 21.4921 22.4482 23.0443 23.6404 24.2245
1022 11.6213 20.2215 20.021S 22.4214 22.0214 22.1214 23.2214 23.821J 24.4213
1022 20.1571 30.1131 21.3932 22.0211 22.1201 23.2472 23.1452 24.4431 25.1011
1023 20.3011 20.9233 22.5450 22.2661 22.7266 23.4104 24.0329 24.454) 25.2712
1024 20.1236 21.3503 22,9931 22.6299 23.2421 23.8173 24.3320 25.1418 29.001S
1025 21.3004 21.9532 22.6059 23.2591 23.1225 24.9642 15.219E 29.0611 26.9229
1026 22.3510 23.0360 23.7201 24.4051 25.0108 25.7756 26.4607 27.1451 27.8306
2000 1.9747 10.0749 20.3747 10.6741 20.1141 11.2741 12.5146 11.0746 12.1141 _
1001 10.3309 10.1413 10.1118 11.2772 11.5921 22.9002 12.2239 22.3310 22.0344
2002 12.5191 12.1611 13.3660 13.7516 14.1340 24.9227 24.1067 15.2316 1S.6166
2003 12.7617 13.1531 23.5445 13.9359 14.3273 24.1167 1S.1101 19.9013 15.0929
2004 11.2149 13.9112 24.0223 14.4277 14.8320 15.2313 1S.6406 16.0449 26.4492
2005 13.3100 13.6007 24.2114 24.6221 1S.0329 15.4431 15.0543 16.2650 14.615,
2006 14.3471 11.7969 25.2260 25.6630 16.2042 11.5431 21.9021 17,4212 27.9602
2007 14.7313 1S.1912 1S.6431 16.0150 16.3410 16.9909 27.4500 17.1021 18.3541
1006 11.1115 16.1121 17.1057 17.5118 18.0920 1S.SSs1 29.4182 11.5713 20.0144
1001 11.2225 11.7115 27.2165 17.7134 12.3104 10.7074 11.2044 11.7013 20.1903
2020 11.4757 17.1068 17.6900 10.2091 10.7203 11.2314 19.1425 2E.2533 20.1648
2011 16.7B90 19.3040 17.8210 12.3340 18.9490 21.3140 10.0990 20.3140 20.0490
2012 17.8602 18.4074 18.9S46 19.5018 20.0490 20.5011 21.1433 21.4105 32.2303
2013 14.4762 19.0447 19.6112 20.1)91 20.7442 21.3107 21.0972 22.4437 23.0102
2014 19.1271 19.9129 20.2187 20.9945 21.4104 22.0592 22.4420 23.22)8 23.1134
2016 20.1193 20.0171 21.4361 22.0542 22.1755 23.2147 13.9140 24.5333 25.2526
Exhibit A
series E salary Ranges
Fiscal Year 1995 - 1996
Range 75th
NO. Min Mid Percentile Max
_____ ________ ________ __________ __________
R 1 15.8942 19.2259 20.8918 22.5576
8 2 16.7307 20.1923 21.9230 23.6538
R 3 17.5384 21.1875 23.0120 24.8365
H 4 18.4326 22.2692 24.1874 26.1057
R 5 19.3557 23.3654 25.3702 27.3750
8 6 20.3076 24.5192 26.6249 28.7307
8 7 21.3461 25.7740 27.9880 30.2019
R e 22.3846 27.0288 29.3509 31.6730
R 9 23.5384 28.4279 30.8726 33.3173
8 10 24.6634 29.7980 32.3653 34.9326
R 11 25.9326 31.3125 34.0024 36.6923
R 12 27.2596 32.9135 35.7404 38.5673
R 13 28.6153 34.5432 37.5072 40.4711
8 14 30.0000 36.2308 39.3461 42.4615
R 15 31.5288 38.0625 41.3293 44.5961
R 16 33.1153 39.9663 43.3918 46.8173
E 17 33.3173 41.6538 45.8221 49.9903
H 18 37.7596 47.4952 52.3629 57.2307
E 19 38.2788 47.8702 52.6658 57.4615
6 20 40.2115 50.2644 55.2909 60.3173
R 25 52.3231 64.6539 70.8192 76.9846
R 27 62.5000 62.5000 62.5000 62.5000
�r�
Exhibit 8-1
unit Salaries
rate: 02 MAY 1995
iRIOM.COOE � 300 L
.I.
Table Sob Grade
Cede Code Subtitle AUN Cede is Max Ma mi. Me MaK
300 1123 FINANCIAL T¢CIRIICIAN 1 1017 17.8110 22.1812 3,088.6267 3,845.6080
300 1227 SR. ACCOU MG CLERK 6 1004 13.6161 16.9538 2J60.2101 2.938.1597
300 1229 ACCWN[ING CLERK 6 1002 12.5454 15.6148 2,114.5160 2.106.5653
300 1414 SR. INFO. N TECH 0 1022 20.XS71 25.1011 1,493.8113 4,350.9573
300 1411 IR80 G C5 TEMICIAN III 3 1011 19.0851 23.7121 3,306.2227 4,118.7640
300 1418 INFO. SWS. T =. II 2 1011 16.1916 20.IS71 2.806.5440 3,413.8973
300 1420 IRFO. S S. TECH. I 0 1008 14.6978 18.2825 2.545.8653 3.160.9663
300 1722 GRAPHICS COOROINAMR 1 MS 17.34S2 21.5000 3,006.5013 3.742.0587
300 1724 SR. GRAPHICS TEC@BICIAM 1 1011 16.1126 20.i571 2.901.5440 3,493.9173
300 1726 GRAPRICS TECHNICIAN 0 1000 14.2861 11.1001 2.471.2573 3,083.2707
300 1924 SR. STORPSEEBPER 2 1013 16.4182 20.4352 2.845.8213 3,542.1013
300 1916 STORESKFSPER 6 1003 13.5239 16.840S 2.344.1427 2,919.0200
300 2225 SECRETARY 13 1003 14.2861 37.7001 2.476.2573 3,083.2707
300 2239 SR. MERK 12 1002 12.5454 15.6148 2.134.S360 2,706.5653
300 2239 CLERM 5 1901 11.2373 13.9917 1,147.7181 2,4263680
`41/
e iCi[ 8 -2
Onit Sala[fea
_ Date; 01 NAY 1195
MW.CODE - 900
mien
Tapia Jep Grade
COO. C00e Joptl[le Av[C Cale Kin Nex NO min Ne Nax
900 3223 SR. ENGINEERING ASSOC. 2 1026 22.3510 27.8306 3.814.1133 4.823.9707
900 3224 ENGINEERING ASSOCIATE 1 1023 20.3013 25.2762 3.518.0920 4J81.2060
900 3233 SR. 41GIMGINEBRING AIDE 2 1020 19A036 24.2565 3.377.8507 4.204.460E
900 3234 ENGINEERING AIDE III 4 1015 17.3451 21.5888 3.006.5013 3.142.0583
900 1235 ENGINEERING AIDE II 5 1009 15.7590 19.6215 2.731.5600 3,401.0.00
900 3236 ENGINEERING AIDE 1 3 1006 14.1134 17.6645 2.460.1813 3,011.8417
900 3316 SR. CONETE=TM IMP. 6 1025 21.3004 26.5225 3,112.0693 4.597.2333
900 3337 CONSIROCIIWN INSPECTOR 11 1020 19.4846 24.2565 3.379.6507 4,204.4600
..ibie B -g
Vnit Salit iav
W Ce: U MAT 1995
VNION.CODE • 700 /
Vnlen �9
Ta03a J" ODSde
CPdR CPS. JOCCi010 Rath Ca09 N10 Nss ND Ni0 NO NOB
Y00 alll OR. BNVIRON. SPECIALIST 1 1094 20.7350 15.101S 1.595.0007 4,412.2100
700 4115 SWIRONMEMA SPEC.II ] 1010 10.570E 23.1415 3.216.9540 4,008.0711
700 4117 SW. SPECIALIST I 1 101) 16.4162 SEAM ].04S.0]13 1.542.1013
700 4514 M. W ANALYST 11 1018 14.5105 11.1115 1.116.9S60 4,000.0711
700 4517 LAB ANALYST 12 1010 15.4120 19.95S4 2.740.4111 3.424.2693
700 4S19 W 4BCRNICIM 0 1005 13.9050 17.1141 2.410.2000 1.001.1413
700 4714 SOURCE CTRL INSP. II 11 1019 1B.S709 51.111S 1.110.9560 4.000.0711
700 4717 SOURCE CTRL INSP. I 1 1010 15.0420 19.7954 2.741.4111 1.424.2193
700 4710 SOURCE CONTROL TECH l 1005 13.9050 17.3143 1.410.2000 1.001.1451
Bxniblc 8.4
Vni[ NEI-iee
Mte: 03 MAY 1115
@IION.COOE . $00
Onion
Table Jon G.".
COEe Cc" Jebcicle Avers 0006 Min HER No Min Mo Max
500 6114 SR. PLANT OPERATOR 26 2013 11.4792 23.0102 3.202.BBBB 3,188.4347
S00 6111 PLANE OPBMATOR 49 200B 16.1195 20.0644 2,714.0417 3.417.B293
500 6129 OPERATOR IN TRAINING 3 2004 13.2241 16.4491 2,210.5427 2,951.1773
500 6218 PUMP ..SR OPERATOR 11 2013 18.4982 23.0102 3,202.9900 3,100.4347
500 6499 WN7ROL CENSER CLERK 10 2002 13.5969 15.6166 2.183.4627 2.717.2773
500 7215 LEAD WORKER 6 2012 17.6602 22.2377 3,015.7600 3.854.5347
500 7217 SR. MICH. WORKER 8 2009 14.7393 18.3546 2,554.8120 3.181.4640
500 7219 MICE. HORKR 10 2005 13.3900 11.6757 2,320.1333 2,090.4547
500 0325 GROUNDSKEEPER 3 2003 12.9617 15.8929 2,212.0280 2,]54.9693
500 9329 HELPER T 2000 1.7747 12.1741 1,614.2613 2,110.2640
500 7332 MACR3NIST 1 2012 I1.8602 22.2377 3,095.7990 3.854.5341
500 7333 WELDER 3 2011 16.7810 20.1090 2,110.0133 3,624.2217
500 9334 EWIPMOIP OPERATOR 6 2010 16.1757 20.7646 2,810.4547 3.511.2320
Soo 7335 BUILDER 4 2009 11.2225 20.1193 2.811.9000 3.501.0387
500 7336 PAINIBR 9 2007 24.7393 18.3941 2,554.8120 3,161.4640
500 7415 LEAD LOLL. PAC, NOSHES. 6 2022 17.6102 22.2377 3,015.7180 3,654.5347
500 7417 SR. LOLL. PAC. WORKER 9 2007 14.7393 18.3544 2,554.8120 3,121.4640
Soo 7410 LOLL. PAC. ROSSER II 8 2005 13.3900 16.6957 2,320.1333 2,010.4547
500 0419 COLL. PAC. NORM I 3 2001 10.3309 12.5544 1.790.6803 2.228.0960
lftw/ 500 7515 LEAD MECHANIC 11 2013 19.4782 23.0202 3,202.8880 3,199.4341
500 7517 SR. MECHANIC 23 2011 16.7890 20.9890 2.910.0933 3,124.2267
S00 7518 MECHANIC 22 2006 14.3471 17.8102 2,486.9193 3.099.7600
500 76LS LEAD ELECT. TSCHNICIAN 4 2015 20.1163 25.1526 3.501.0387 4,351.7040
500 7617 SLECI. TBCHNICIAN II 8 2014 19.1271 23.6136 3,325.3640 4.127.6907
500 Isis ELECT. 76CKMICIAN I 5 2009 11.2225 20.1103 2,811.1000 3.501.0387
500 1619 ELEM. MTCE. NORM 3 2007 14.7393 18.3541 2.554.8120 3.191.4640
Soo "is LEAD IHEIR. TECHNICIAN 4 2015 20.1163 25.1521 3,501.0307 4.359.7040
Soo 1117 IEM. TECHNICIAN II 13 2014 11.1271 23.8136 3.315.3140 4.127.6107
500 9]18 IEITR. 78CRE.CIAN I 9 2009 16.2225 20.1983 2,011.9000 3.801.0387
500 7719 INSIR. MTCE. MOSHER 5 2007 14.7393 18.3546 2,554.8120 3,181.4640
OaBlBic B-$ a
Quit eBleltm
Mce: 02 MY 1115
mw.Cw0 . 600
ibOle JOB 02Bd0
COda Code JeBeiele Au[B CWe Mi0 IYz m M'R M Nes
_____ ______ ______________________________ ____ _____ ________ ________ ____________ ____________
600 2115 K . SH 10 BOARD 0I1. 1 1021 11.6215 24.4223 3.602.0100 4.233.0252
000 2116 OEW BOARD SSC . 1 1019 17.8110 22.1062 3.688.6217 3.NS.6060
600 2221 SBCR. M G010UL MR. 1 1019 17.6190 22.1362 3.090.6261 3.065.6080
600 2223 ADBIB. SgQ .[ 5 1022 16.3"1 20.30" 2.036.1021 3.518.4120
600 2227 M. O99IC8 Al. 1 1006 13.6161 16.9530 2.310.2141 2.139.6587
600 2229 O"ICR AIDE 2 1002 12.5650 15.1148 2.116.5310 2.906.5653
600 0119 PEICSONB6L ASSISSA 2 1012 16.3069 20.2013 2.826.1827 3.514.6120
u
eabibin B-6
Unit Sala[lae
Data: 02 MAY 1115
\ / UNION.COOB . 225
�I Union
Table Job Gt d.
Code Code dobtitln Auth Coda Min Mau No NSn No Max
225 1212 SENIOR ACCOUNTANT 1 5 19,3591 27.3750 I,354.1080 4,745.0000
225 1214 ACCOUNTANT 1 1 15.9942 22.5571 2,754.9947 3,109.5840
225 1412 PRINC. INFO. SVCS. TECH 1 l 21.3461 30.2019 3,999.9907 5,234.9910
225 1520 INFO. SVCS. ANALYST 1 l 21.3461 30,20" 3,611.9907 5.234,9110
225 1612 PROGRN46BR ANALYST 4 l 22.3461 30.2011 3,699.9907 5,234.9960
229 1114 PROGRAMMER 4 4 10,4326 26.1057 3,114.1640 4.924.9880
225 1914 SR. BUYER 1 4 10.4326 26.1057 3,194.964. 4,524.9880
225 1816 BUYER 3 1 15.6942 22.5576 2,754.9947 31909.9040
225 2214 PRINC. MMIN. ASSISTANT 1 9 23.5364 33.3173 4.079.9093 5,774.9967
225 2216 SR. ADMIN. ASSISTANT 1 6 20.3076 28.7307 3,519.984. 4,91..9880
225 3114 ENGINEER 15 11 25.9326 36.6123 4,494.9840 6,359.99B7
225 3117 ASSOCIATE ISOMER III 11 0 22.3841 31.6130 3,079.1173 5,489,9817
225 3110 ASSOCIATE ENGINEER II 3 5 19.3557 27.3750 3,354.1... 4,745.0000
225 3119 ASSOCIATE ENGINEER I 2 3 1].5384 24.8365 3,039.9893 4,304.1133
225 3222 PRINC. MR. ASSOC 3 9 23.5354 33.3173 4,079.9813 5,774.9987
225 4221 PRINC. ENV. SPECIALIST 3 0 22.3.46 31.6730 3,879.9173 5,409.986E
225 4415 PROJECT SPECIALIST 2 9 23.5384 33.3173 4,019,9893 5.774.998E
225 4514 PRINC LAB 6 US. ANALYST 8 6 20.3079 28.730E 3.519.1040 4,919.9080
225 4612 SCIENTIST 6 9 23.5304 33.3173 4,079.1993 5.114.99.E
225 6114 PERSONNEL ANALYST 2 2 16.7307 23.6539 2.819.9680 4,099.9920
225 8212 SAFETY 6 EMER, RESP, SPEC. 1 8 22.3846 31.6730 3.571.9973 5,489.9867
SBA3Clr a-7
Unit Salaries
Gyre. 02 MAY ills
UNION.COOE • 200
Gain. �I
Tame Doe Green
Cade Code seerirle Aurn Cade Min Ms. Me Min Mo Naa
200 1210 PRINCIPAL ACCOUNEANT 3 9 13,530E 33.3173 4,O71.9893 5,774.9907
200 1610 IMPO SVCS. SPECIALIST 1 11 25.9329 36.1923 e,e Pe.9Be0 6,359.1187
200 1610 9OPTNME SPECIALIST 1 11 25.932E 31.6923 4,414.9840 6,399.9987
200 1610 SUPERVISING BUYER 7 21.3491 30.2019 3.699.91.1 5,234.1910
200 1110 MARBMOVSE SUPERVISOR 1 e 19.4326 26.IOS7 3,194.9040 4,524,1660
200 3110 ENGINEERING SUPERVISOR 6 14 30.0000 42,4615 5,200,0000 7,359.9133
200 3112 SENIOR ENGINEER 3 13 28.6153 40.4711 4,151.1853 7,014.9901
200 3305 CHIEF CONST. INSPECTOR 1 30 24.1134 36,932E 4,274.9B93 6,0$4.9040
200 3310 SO" CONSTR INSPECTOR 3 9 23.S394 33.3173 4,O79.1093 5,774.9987
200 4210 COMPLIANCE SUPERVISOR 2 12 27.259E 38.5673 4,724.1973 6,194.1987
200 4510 LAB SUPERVISOR 3 12 27.259E 38.5673 4,724.1973 61604.9187
200 4610 SENIOR SCIENTIST 3 12 27.259E 38.5673 4,724.1173 1.184.9997
200 4710 SOURCE COMROL SUPERV. 1 9 23.S394 33.3173 4,079.9893 5.774.1987
200 4712 SO" SOURCE CTRL INSP. 2 5 19,3557 27.3750 3,354.9880 4.745.0000
200 6105 SR OPRRATIONS SO" 2 11 25.932E 31.6923 4,414.1840 6,351.9987
200 6.0 OPERATIONS SUPERVISOR 15 9 23.5304 33.3373 4,079.9813 5,774.1187
200 6310 TRAINING SUPERVISOR 1 0 22.3946 31.1730 3,079.1973 5.469.9817
200 7110 FIELD SUPERVISOR 11 9 23.5394 33.3113 4.071.1893 5,774.9987
200 7112 FOREMAN 9 5 11.3557 27.3750 3J04.9900 4.745.00:0
200 7112 ELECTRICAL FORSMAN 3 7 21J461 30.2011 3.699.9907 5.234.990
200 7712 PORENAN-INSTRUMENTATION 3 7 21.3441 30.2011 3,619.9107 5.234.9960
200 8310 SECURITY SUPERVISOR 1 6 30.307E 28.7307 3.5.9.1840 4,171.1880
--I0 2-8
Mail a63ez:ee
Do"; OR MAY 1995
` ' OMId.CW9 . 100
`� Oniav
L6Cta SOE 9[6M
Cede Cella Joo1i)le Ankh Cede Ni. WAN m Mid Me MeN
_____ ______ ______________________________ ____ _____ ________ ________ ____________ ------------
100 0001 GENERAL MAMRGER 1 Il 62.5000 62.9000 10,833.3333 10.833.3333
too 0002 AEST. GEN. NOR. A IN. 1 20 40.2115 69J113 6.969.9933 101656.9989
too 0003 ARMT. GEM. MGR. OPERS. 1 20 60.1119 10.3273 6.961.9133 10.656.9987
100 3000 DIRECTOR O9 FINANCE 1 18 31.7S91 $7.2307 1.566.1973 9.919.9990
too 2200 CHIEF MAIN. ASSISTTWT 1 17 33.3173 49.9903 5,7I4.99e7 8,666.9653
too 3000 DIE. OF ENGINEERING 1 19 38.2788 51.6615 6,634.9920 9.959."33
100 6000 DIR. OF TECMIIIGAL SRVCS. 1 19 38.2168 S1.4615 6,134.1120 9.151.1133
100 5000 DIR. OF OPERE. 6 MWE. 1 19 38.210 51.6615 6,134.1120 1,151.1133
lee 1000 ASS). DIR. OF Ome. 1 17 33.3173 41.1103 5.116.1187 8,164.1853
too 7000 AA9T. DIR. OF HIQ. 1 17 33.3173 69.9903 5.916.9967 8,664.9053
100 8000 PQ8010m atRECICR 1 lT 33.317) 69.9903 5.996.9987 8,614.9853
WION.CODE - 115
Unie0
Toole Jab 0zede
code Cade Omci61< AaN COde Min M6i Na Miv b MoR
1T5 1200 PIIOIMCIM MANAGER 1 35 3LS69 66.5%1 S.466.9920 7.729.1907
IJS 1200 WHFROLL9l 1 15 31.S269 66.5961 5.666.9920 1.121.1107
1l5 1201 A(COONPING MAMAGM 1 11 28.6153 60AY11 4.959-1053 7,014.1900
il5 1300 INFO. SWS. MANAGER 1 16 30.0000 62.6615 5.100.0000 7.351.9933
175 1800 PURCHASING MANAGER 1 12 27.2596 36.3973 6.>26.9973 6.684.9907
195 2100 SECTY TO THR MOARO DIR. 1 if 30.0000 42.4115 5,200.0000 7.359-1933
17S 3100 OAIINBBNING NAMAGER l 16 33.1153 66.6173 5.]39.959) 0,114.9987
135 3300 CONSTRUCFIW MANAGER 1 16 33.1153 66.8173 5,739.9853 9,114.1167
135 6100 AIR WMM MANAGER 1 16 30.0000 42.4115 5,200.0000 1.359.9933
175 6200 C IANCE MANAGER 1 if 33.1153 46.8173 5.739.%S3 0.114.1197
175 6300 B6R MANAGER 1 16 36.0000 42.4115 5.20D.D000 1,351.1133
17S 6500 WD MAIIAGER 1 16 33.1153 66.917) 5,739.9853 8.116.9987
175 6100 SOURCE COMFROL MANAGER 1 16 33.2253 66.2173 3.731.1853 9.116.9987
17S 6100 CHIEF OPEMTOR 3 13 20.61M 60.6711 6.959.9653 7.014.1107
315 7100 FAILITIES MANAGER f 12 27.2591 38.5673 4.716.9973 1.194.1187
ITS 8110 P0SOl01EL SUPERVISOR I 9 23.S344 23.3173 4,O71.1913 S.716.9107
175 0113 SR. PEMCMMEL .ANALYST 1 f 20.3076 28.7307 1,519.9060 6.919.1980
175 $200 SAPSR 6 EKER. RESP. MIWA.ER 1 13 20.6153 60.6711 4.951.1053 T,016.9907
exhibit 8-9
unit Salaries
date: 03 MAY 1995
OMIOM.COOS • 999 \ /
Wfan �✓
Table Job Grade
Cade Code Jobtible AOth Code Min Max x0 Min M0 xar
999 1919 STO rsxlIMG ASSISraet 1 909 1.1800 12.9953 1.071.2000 3.232.4530
999 1199 P.T ASST T 103 1.1600 10.5187 1.011.1000 ..811.1090
999 1199 P.S. CONST. IMSPSCTOR 906 19.1065 25.3071 3.311.7933 4.366.5140
999 9999 COM'RAC7 EMPLOYER 4000 21.0000 61.0000 1.640.000E 7.453.1111
999 7291 PP ASST-SUMMER 38 901 .0000 1.0000 .0000 1.040.0000
999 8195 SECURITY GUARD l 1000 7.9661 1.6414 1,341.1413 1.674.6427
999 0399 P.T. SECURITY GUARD T 102 7.1561 9.4254 1.118.7360 1.410.4027
UMION.Com - 150
Winn
Table Jnb Grade
Code Code Jebtitl0 Auth Code Min Man No Min Me sea,
950 1990 IGTsRM l8 105 1.1100 16.000E 1.606.8000 2.773.3333
• Bmibit C
Peaition Sea Salaries Oy Oe9artaent
.to; O2 MAY 1995
y✓
Depe Job Roth
Code Cede Job Title Ste Grade Salary 9ae9ee Meethly Salary Raeges
2150 0001 G®l6AAL MANAGER 1.00 24 $62.5000 - $62.5000 10,833.3333 - $10,833.3313
1350 0002 ASST. GEN. MT. ADMIN. 1.00 20 $40.2115 - $60.2173 $1.111.9133 - $10.054.1187
2"0 0003 ASST. GBN. MGR. OPEAS. 1.00 20 $60.2115 - $60.3173 $1.919.1133 - $10.454.99.1
2150 2221 SBCtY. TO GENERAL MR. 1.00 1017 517.6190 - $22.1012 $3.088.6267 - $3.845.6000
1150 222E SECRETARY 1.00 1007 $14.2061 - $17.7081 $2.4)6.2573 - $3.003.2707
2.50 5 00
Dept Job Roth
Cede Code Job Title It. Grade Selary Ranges ..rhly Salary Ravga9
2110 2100 SECTY TO THE ROARO DIR 1.00 16 $30.0000 - $42.4115 $5,200.0000 - $7,351.9133
1160 211E REST. SECT TO BOARD DI 1.00 3022 $11.6215 - $24.4213 $3.401.0600 - $4.233.0253
2110 2116 DEPUTY BOARD SECTY. 1.00 1017 $17.8110 - $22.2812 $3.000.1217 - $3.O45.6000
2160 3.00
Dept JOb Ruth
Cede Cede Job Title FT. Grade Salary Range. Monthly Salary Ranges
2170 2200 CMIEF ADMIN. ASSISTANI 1.00 13 $23.3173 - $49.9903 SS.774.9907 - $8,614.9953
2170 221E PRIMC. AXMN. ASSISTAN 1.00 9 021.538E - $33.3173 54.O71.9093 - $S.776.9907
2170 221E SR. ADKIN. ASSISTANT 1.00 6 $20.3076 - S20.7387 $3.519.9890 - $4,979.9990
2170 2223 Ad1IN. SECRETARY 1.00 loll $11.3049 - $20.3013 $2,821.1027 - $3.519.9920
2170 2227 SR. OFrr= AIDE I.S. 100E 513.616E - 516.9538 $2,310.2107 - $2.939.6587
2170 2229 OFFICS AIDE 2.00 1002 $12.5054 - $I5.6168 $2.179.5310 - $2.706.5653
2170 2237 SR. CLEAR 1.00 1002 512.5958 - 515.6168 $2.176.5360 - $2,701.5653
2170 8.00
�i9�
Srbibit C
Position and Salaries by oepszenent
Data, 02 MAT 1995
v
Dept Sob Ruth
Cods Cade Sob Title Fte trade Saiaty Rtlyae Monthly Salary Ranges
2180 8000 PERSONNEL DIRECTOR 1.00 17 $lldlll - $41.9903 SS.776.9901 - $0.664.9B53
2180 8200 6aRSTy 6 EMER. "SR. M 2.00 ll 526.1153 - $40.4721 96.959.9BS1 - $7.014.9907
2160 9110 PERSONNEL SUPERVISOR L00 1 $23.5384 - $33J2II $6.071.1013 - $5.716.1967
2190 0212 SAFEW 6 MR. SEEP. S 1.00 0 $22.3841 - $31.6730 $3,971.9973 - $5.499.9867
2100 8112 SR. PBRSOMMEL ANALYST 1.00 6 $20.3076 - $28.7307 $1.519.9860 - $6.171.1960
2100 0310 SBCORITY SUPERVISOR 1.00 6 $20.3076 - $28.73 Ol $3.511.1840 - $4.171.9560
2160 9115 PERSONNEL ANALYST 2.00 2 S16.73Ol - $2).65)0 S2.899.9880 - $4.011.9120
2180 Bill PERSONNEL ASSISTANT 2.00 1012 $16.3069 - $20,3013 $2.026.1.27 - $3.519.0120
2100 2125 SBCNEPART 1.00 1007 $14.2811 - $17.7991 $2.416.2513 - $).083.2707
2160 1227 SR. ACCOUNTING CUM 2.00 1006 $i3.6166 - $16.1538 $2.360.2107 - $2.928.GSBl
2160 1221 ACCOUNTING CLERK 1.00 1002 $12.5454 - $15.6148 $2.116.5360 - $2.106.SIS3
2180 llli SR. CLEM 1.00 1002 $12.5656 - $15.6186 $2,174.5310 - $2.101.5653
2190 1110 INTM 1.00 905 $1.2700 - $11.0000 $1.601.9000 - $2.112.))))
2160 8315 SSCORITY GUARD 3.00 1000 $7.7662 - $1.1614 $1.346.1413 - $1.616.6421
2200 0399 P.T. SECURITY GUARD 7.00 102 $7.3562 - $8.4254 $1,216.7280 - $1.660.4027
2180 25.00
Dept Seb Antb
Cede Code Job Title Fta trade Salat M ngec Monthly Salary Rah ee
.. ____
1210 1000 DIRECTOR OF PIMANCE 1.00 10 $31.7516 - $57.21e1 $6.566.9971 - $1.111.1880
2210 1100 FlaN rN MANRGER 1.00 15 S31.5208 - $44.5111 S5.666.9920 - $1.121.9907
2210 2213 Abate. SBCtEtARY 1.00 1012 $11.3041 - $20.3013 $2,821.1927 - $1.518.9920
2210 ).00
`.J
Exhibit C
Position and Salaries by Department
Date, 02 MAY 1995
Dept Job AUCh
Cade Cede Job Title PCe trade Salary Range. Monthly Salary Ron,..
2220 1100 CONTROLLER 1.00 15 $31.5208 - $44.9911 $5.464.1920 - $1,121.1107
2220 1202 ACCOVMPINC MANAGER 2.00 13 $28.6153 - $40.4711 $4,959.1953 - $7,011.9907
2220 1210 PRINCIPAL ACCOUNTANT 3.00 9 $23.5384 - $33.3173 $4,079.9093 - $5,114.9987
1220 1211 SENIOR ACCOUNTANT 1.00 5 $11.3597 - $27.3750 $3,354.9880 - $4.745.0000
1220 1121 FINANCIAL TEC@2CIAN 1.00 101I $17.0190 - $22,1862 $3,066.6267 - $3,845.6080
2120 1214 ACCOUNTANT 1.00 1 $15.8142 - $22.5574 $2,754.9147 - $3,909.9.40
2220 1227 SR. ACCO MTINO CLERK 9.00 1004 $13.6166 - $11.1538 $2A60.2109 - $2,930.6587
2220 1229 ACCOUNTING CLERK 5.00 1002 $12.5454 - $15.6149 $2,174.5360 - $2,709.5653
2220 2239 CLERK 1.00 1..1 $11.2373 - 013.1117 $1,147.7967 - $2,421.2680
2220 19.00
Debt Tob Auth
Code Coda Job Title Pro Grade Salary Range. Monthly Salary Ranges
..... ..... ...................... ...... ..... ......................... ..........................
2230 1600 PORCOLSING HAIAUER 1.00 12 $221596 - 330.5173 $4,724.1173 - $6,684.1187
2230 1814 SR. SUPER 1.00 4 $16.4326 - $26.1057 $3,194.1840 - $4,524.9800
2230 1110 M RSMOOSS SUPERVISOR 1.00 ♦ $10.4326 - 026.1057 53,194.PS40 - 54.524.9880
2230 1914 SR. STORESMEEPER 2.00 1013 $16.4182 - 820.4352 $2.845.8213 - $3,542.1013
2230 1B16 BUYER 3.00 1 $15.6942 - $22.5576 $2,754.9941 - $3,901.9840
2230 2225 SECRETARY 1.00 100, $14.2061 - S1I.7981 $2.476.2S?3 - $3,003.2701
2230 1916 STORESKEEPBR 1.00 1003 $13.5239 - $16.8405 $2.344.1427 - 02,919.0200
1230 2237 SR. CLERK 2.00 1002 $12.5454 - $15.6140 $2,174.5310 - $2,701.5153
2230 1111 STORESKESPING ASSISTAI 1.00 904 $6.1600 - $12,6853 $1,071.2000 - $2,233.4520
2130 18.00
emin it c
Position and Salaries by Department
Same• 01 MY 111S
V
Wpm Job Ruth
COW hoe .Peh TIII. F. Ozade Salary Ranges "ammy G31ry RYgea
------
2240 1300 IWO. SOC9. MANRGER 1.00 14 $30.0000 - $42.4615 $5.200.0000 - 57.351.1133
2240 1410 IWO W(DS. SPeCIALISf 1.00 11 $25.1326 - 536.6923 $4,414-1940 - 56.359.9987
2240 1610 SOPTNARE SPECIALIST A. 11 $26.1321 - $36.6923 $4,414.9440 - 06.359.9187
2240 3117 ASSOCIATE ENGINEER III ..so S $22.3846 - $31.1730 $3,871.9073 - $5,489.9867
2240 1412 PRINC. INFO. SVlS. 'BC 1.00 T $21.3411 - $30.2019 $3.699.9907 - $5.234.1910
3240 1520 INFO. $VCS. ANALYST 1.aa T $21-3461 - $30.2019 $3,191.9907 • $5.234.1160
2240 1612 PROGRAMMER ANALYST 5.00 T $21.3461 $30.2011 $3.111.9907 - $5.234.9160
2240 141E INFO SVC$ TECNMICIAM I 3.00 1019 $19.0459 - $23.7121 $3.304.3227 - 54.116.7640
2240 1614 PROGRNMER 4.00 • $19.4326 - $26.IOS7 $3,114.9040 • 34,S24.9860
2240 1722 GRAPHICS COOR➢IMATOR 1.00 1014 $17.3452 $21.5886 $1.006.5013 - $3.741.0567
_ 2240 1410 INFO. SVC3. TECH. ZI 2.00 2011 $16.2116 - $20.1571 $2,$06.U40 - $3,493.8973
2240 1734 M. GRAPHICS TICHNICZA 1.00 1911 $26.1916 - $20.1571 $2.406.5440 • $3,493.8973
2240 2235 SSG1TARY 1.00 to" $14.2661 $17.7881 $2.471.2573 - $3,083.2707
2240 23.00
V
Dmpt Job RUN
Code COW SOh Helt Its Gtad. SaLry Raegee assembly Salary RHO3ea
3310 5000 DIR. OF OPR4. 6 MICE. 1.00 19 $38-2766 - $57A61S $1,134.1120 - $9,959.9933
3316 4000 AMID. OIR. OP OPERS. 1.00 17 $33.3173 - $41.1103 $S.714.9587 - $9.664.9e53
3310 7000 A&SI. DER. OF MKE. 1.00 19 $33.3173 - $41.1101 $5.774.1187 - $6,664.1853
3310 3110 BK.ZNBERING SUPERVISOR 1.00 S< $30.0000 - $42.4115 $5.200.0000 - $7.3S9.9933
3310 4210 COMPLIANCE SUPERVISOR 1.00 12 $27.2516 - $38.567) $4.724.1173 - 11,684.1997
3310 3114 ENGINEER 3.00 11 525.932E - $31.6123 $4,414.1040 - $4.351.1107
3310 4112 MCI6IPIIST 1.00 9 $23.5384 - $))J173 $4,O71.1613 - $5,T)4.9907
3310 3119 ASSOCIATE ENGINEER III 1.00 0 $22.384E - $31.6730 $3,971.1173 - $5.489Je67
3310 3110 RsSOCIATS ENGINEER ZI 1.00 5 $11.3557 - $27.3730 $3.394.9e80 - $4.745.0000
3210 4235 CWIRUMMMCD L SPEC.ZZ 1.00 1018 $15.5701 - $23.1235 $3,218.1560 - $4.008.O733
3310 4227 M. SPECIALIST I 1.00 1013 $11.4182 - $20.4352 $2,845.0213 - $3,542.1013
3310 2233 stable. SECRETARY 2-00 1012 $11.3041 - 520.3013 $2.821-1027 - $3,518.0920
3310 2235 SECRETARY 1.00 1007 $14.2061 • $17.7SSI $2.476.2573 - $3.043.2107
3310 2231 SR. CIM 2-00 1002 512.5454 - $13.6144 $2.174.3360 - $2.706-5153
3310 2231 CLERK 2.00 1002 $11.2373 • $13.9917 11.N7.79S7 - $2,426.2400
3310 1110 INTOW 1.00 905 $9.2760 - 019.0000 31.606.6000 - $2,773.3333
3310 21.00 v
EdMieit C
Position and SalariU by Bp6ibMt
Date: 03 MAY 1915
Dept ,Toe Rote
Cede Coda Joe Title FCO OTede ealery ReeRe, Mealy Salary Range.
3130 7100 FACILITIES M6MWRR 1.00 12 g9.2S96 • $30.3673 $4,724.9973 - $6,604.9167
3330 7110 FIELD 6UPERVISOR 2.00 9 $23.5394 - $33.3173 $4,071.1913 - $5,116.1981
3330 7112 FOREMAN 6.00 5 $11.3551 - $27.3750 $3.354.1090 - $6.169.0000
3330 131S LEAD NORRBR 1.00 2012 $19.e102 • $22.2377 $3.015.7190 • $3,854.5347
3330 733E EOUIPMENT OPERATOR 3.00 2010 $16.6757 • $20.1669 $2,810.4547 - $3,311.2320
3330 7335 BUILDER 4.00 2009 $16.2215 - $20.1983 $2,811.1000 - $3.501.0307
3330 7217 5R. MTCE. NERKER 8.00 2007 $14.7313 $16.3596 $2,554.0120 - $3,191.4640
333D 7336 PAINTER 1.00 2007 $14.7393 - $18.35e6 $2,554.8120 • $3,181.4640
3330 7211 MICE. xORKER 10.00 2005 $13.3000 - $21.6757 $2,320.1333 - $2,890.eS97
3330 7325 GROUNDSKEEPER 3.00 2003 $12.7617 $15.6129 $2,212.0280 - $2,754.7691
3230 9329 HELPER 7.00 2000 $9.7767 $12.1746 $1,694.2013 • $2,110.2140
3330 $7.00
Dept ,Tao Both
Cade Code Jae Title Ft* at". Salary Pongee HPately Salary RaoOaa
----- ----- ______ _____ _________________________ __________________________
33e0 7100 FACILITIES MANAGER 1.00 12 $27.2599 - $38.5673 $4,724.9973 - $1,184.9187
3340 711D FIELD SUPERVISOR 2.00 9 123.5384 - $33.3173 $4,079.9493 - $5,774.9187
3360 7112 FOREMAN 2.00 5 $19.3957 - $27.37$0 $3,354.9900 - $6.765.0000
1160 7415 LEAD COLL. PAC. WORKER 1.00 2012 $11.9102 - $22.2317 $3.09S.7600 - $3,9S6.5367
3360 7617 SR. COLL. PAC. WORKER, 9.00 2001 $14.7313 - $18.3566 $1,551.8110 - $3.101.4640
3360 7818 COLD. FAC. HOME TT 6.00 2005 $13.2200 - $19.9757 $2,320.1333 - $2,010.4567
3360 1619 COLL. PAC. WORKER I 3.00 2001 910.33D9 - $12.6566 $1.710.6893 - $2.220.016U
3340 31.00
Ernibir C
Poeatien and Salaries by Gapseemant
Date: 02 MAY 1995
Dog, Sob Auth
Code Code Job Title Pte Grade Salary Ranges M .ahly Salary Ragas
3350 7100 FACILITIES MANAGER 1.00 12 $27.2516 - $36.5173 $4,124.1973 - $1,184.1987
33SO 7110 FIELD SUPERVISOR 3.00 9 $23.53$4 $33.3173 $4.079.2093 - $5,774.9167
3350 7112 FOREMAN 2.00 5 $19.3557 - $27.3750 $3,394.1880 - $4,745.0000
3350 7515 LEAD MECHANIC L3.0$ 2013 $18.4782 - $23.0102 $3.202.0900 • $3.9sE.4347
3350 7332 MACHINIST 1.00 2012 $17.8602 - $22.2377 $3,095.1680 - $3,854.5347
3350 7333 VELURE, 3.00 2011 $16.9$90 - $20.1010 $2,910.0933 - $3,124.2267
3350 7517 SR. MECHANIC 23.00 2011 $26.7810 - $20.1010 $2.910.0933 • $3,124.2217
33SO 7334 SOUIM®IP OPERATOR 3.00 2010 $16.6757 $20.7148 $2.090.454T - $3,599.2320
3350 3518 IBCNANIC 22.00 2001 $14.3471 - $17.8602 $2,486.1193 - $3.095.7660
3350 19.00
Dept Joe Aoth
Code Code Sob Title Ft. Grade Raisry Ranges Monthly salary Ranges
3360 7100 FACILITIES MANAGER 1.00 12 $27.2596 - $38.SM $4,724.1973 - $1,684.9987
3360 7110 FIELD SUPERVISOR 2.00 9 $23.9384 - $33.3173 $4,010.1813 - $5.734.9987
3360 1612 ELECTRICAL PORRMAI 3.00 l $21.3411 - $30.2019 $3,111.9107 - $5,234.1910
3360 FELS LEM ELECT. TECHNICIAN 4.00 201S 820.1103 - $25.1521 $3,901.0387 - $4,359.7040
3310 1110 ELECT. TECHNICIAN II 8.00 2014 $19.1271 - $23.8136 $3,315.3640 - $4,127.9907
3310 7618 ELECT. TECHNICIAN I 5.00 2009 $11.2225 - $20.1983 $2,011.1000 - $3,501.0307
3310 7619 ELECT. NICE. ROARER 3.00 2007 $14.7393 - $18.3546 82.554.0120 - $3,101.4640
3360 26.00
Dept Jab Rath
Code Coda Job Title Fta Grade Salary Ranges Monthly Salary Ranges
_____ _____ ______________________ ______ _____ _________________________ __________________________
33T0 7100 FACILITIES MANAGER 1.00 12 $27.2511 - 139.5673 $4,724.9973 - $6,184.1987
3370 0130 FIELD SUPERVISOR 2.00 9 $23.5384 - $33.3173 $4.079.1813 - $5.774.9167
1370 7712 FOREMAN-INSTRUMEbTATIO 3.00 T $21.3461 - $30.2019 $3.699.0907 - $5.234.9960
3370 7715 LEAD INSTR. TECHNICIAN 4.00 201S $20.1903 - $25.1S26 $3.501.0387 - $4,331.7840
3170 I717 INSTR. TECHNICIAN II 13.00 2014 $19.1271 - 323.8131 $3,315.3640 - $4.127.6907
3370 7718 INSTA. TECHNICIAN I 7.00 2001 311.2225 - $20.1983 $2,811.9000 - S3.501.0387
3370 7719 IMETR. NTCR. POROUS 5.00 2001 $14.7313 - $19.3541 $2.554.812C - $3,101.4140
3370 35.00
Erbibir C
Position And Salaries W Oawremevr
Oar.: 02 NAY 1995
oeaC Job Ruch
Code Code Job Title Ste Oracle Salary Bav$e. Nnntbly Bales, Ram,..
_____ _____ ______________________ ______ _____ _________________________ __________________________
3380 6100 CHIEF OPERATOR 2.00 13 $28.1153 - $40.4711 $4,151.1853 - $7.014.9107
3380 1100 FACILITIES MANAGER 1.00 12 $21.2596 - $16.56T3 $4.714.99T3 - $6.684.1167
3390 1205 SR OPERATIONS SUPV 2.00 11 $25.9326 - $36.192) $4.494.9640 - $6J59.9989
33.0 1110 OPERATIONS SUPERVISOR 14.00 9 523.5364 - $33.3173 $4,071.9093 - $5.714.9997
338D 6310 TRAINING SUPERVISOR 1.00 B $22.3941 - 5)1.6]30 $2.879.1173 - $5.40P.P$67
3380 6114 SR. PLART OPERATOR 28.00 2013 $18.4702 - $23.0102 $3,202.8880 - $3.13B.4247
3390 9214 PUMP POSTS OPERATOR 12.00 2013 $1B.4702 - 123.0102 $3,202.8980 - $3,908.4347
3380 6116 PLAMf OPERATOR 49.00 2008 $16.1195 - $20.0644 $2.794.0417 - $3.4".0293
3380 6497 CONTROL CENTER CLERK 20.00 2002 $12.9969 - $15.6766 $2.103.4627 - $2.717.2773
3380 2239 CLERK 1.00 1001 $11.2373 - $13.1117 $1,947.7907 - $2,426.2680
3380 120.00
Oear Jab Ruch
CUSS Code Jab Title Fee Grade Salary Assets. NentOly Salary Relyec
_____ _____ ______________________ ______ _____ _________________________ __________________________
)S10 4000 DIR. OF TACM)ICAL SAW 1.00 19 $30.2710 - $S7.4615 16.634.9920 - $1,951.1133
3S10 2223 AOMIN. SECRETARY 1.00 1012 $16.3049 - $20.300 62.826.1927 - $3,510.0920
3S10 2231 SR. CLERK 1.00 1002 $12.5454 - $25.1145 $2.174.5360 - 52.706.5653
3510 9110 INTERN 7.00 as $1.2700 - $11.0000 $1.609.8000 - $2.773.3333
3510 10.00
Exhibit C
Poeitian am salaries by bepartmmt
Date: 02 NAY 1915
Copt Job Auth
Coda Code Job Title Ste Grade Below Slnda9 MonNly "Law abodes
----- ----- ---------------------- ------ ----- ------------------------- ---------------..---------
3520 e200 COMPLIANCE NANAGER 1.00 16 $33.1153 - $46.6173 05,739.1853 - $8,114.1197
ME 4210 COMPLIANCE SUPERVISOR 1.00 12 $27.2516 - $3S.SI73 $4,716.1173 - $6,6a6.9997
3520 0610 SENIOR SCIENTIST 1.00 12 $27.2996 - $29.56)) $6.]26.997) - $6.660.9997
MO 3113 ASSOCIATE ENGINEER II1 1.00 S $22.3046 - $31.6730 $3.079.1973 • $5,409.9967
3520 6221 PRINC. ENV. SPECIALIST 2.00 0 $22.3646 • $31.6730 $3.879.9973 - $5,409.9067
3520 0223 SR. SOVIRON. SPDCIALIS 1.00 1024 $20.7236 • $15.0015 $3,991.0907 - $4.472.2400
3520 6235 ENVIROHIffiNTAL SPEC.II 1.00 3010 $10.5709 - $23.1239 $3,218.9910 - $4,00S.OM
3920 6117 SM. SPECIALIST I 1.00 1013 $16.4192 - $20.4352 $2,946.8213 - $3,5e2.300
3520 2225 SECRETARY 1.00 1007 $14.2911 - $17.7e91 $2,476.2573 - $3,003.2707
3530 2237 U. Class 1.00 1002 $12.5156 - $15.1118 $2,176.6360 - $2,106.9653
3520 12.00
Daft Job Auth
Cads Code Job Title It. Grade Salary "e. Monthly Stlery Ranges V
3530 6300 MR MANAGER 1.00 ti 030.0000 - $42.4615 $5,200.0000 - $7,359.9933
3530 4e15 PROJECT SPECIALIST 3.00 9 $23.9394 $33.3173 $4,071.9613 • $5,174.1181
3530 4225 ENVIRONMENTAL EPEC.II 1.00 101E $13.5701 - $23.2235 $3,210.9560 - H.008.0733
3530 2225 SECRETARY 1.00 1007 $14.2061 - $21.1081 $2.671.2373 - $3.OB3.3709
3930 00
Dept Job AVCh
Cede Cede Job Title Ste Glade "law RaD1es Maithly "law Rana
..........................
3560 6100 AIR QUALITY MANAGER 1.00 le $30.0000 • 841.61LS $5.200.0000 - $7,351.9133
3510 4610 SENIOR SCIENTIST 1.00 13 $27.2396 - $3B.5E13 $4,721.9973 - $6,696.9907
3560 3114 ENGINEER 2.00 11 $25.9326 • $36.6913 $1,496.9960 - $6.359.9907
3540 2225 SECRETARY 1.00 1007 $14.2061 - $17.7001 $2,116.2573 • $3.003.I7O7
U
3940 5.00
exhibit C
Snaitiue MI Salarlea by Oopartneet
bete: 02 MY 1995
Oepe Job Aueh
Code Cede Job Title eta Grade salary Raegea Henthly Salary Ram es
-- - -------------- --- -- --
3500 6900 LM HASME'R 1.00 16 $33.1153 • $66.9173 $5,739.9053 • $9,114.9967
3500 4S10 LAB SUPERVISOR 3.00 12 $27.2596 • $38.9672 $4,724.9973 - $4,664.9907
3560 1610 SENIOR SCIENTIST 1.00 12 $27.2596 - $30.5673 $4,724.0973 - $4,494.9907
3300 6612 SCIENTIST 7.00 9 $23.9384 - $33J173 $b 0T9.9S93 - $S,774.9997
3550 451E PRINC. LM 6 RES. MAL 6.00 6 $20.3076 - $29.7107 $3,519.9040 - $4,979.9000
3590 6516 SR. LAB ANALYST 16.00 1010 $18.5709 033.1235 $3,218.1560 - $4,000.0733
3680 4517 LAR ANALYST 12.00 1010 $15.9420 - $19.7S56 $2,799.413) - $3,424.2693
3580 2225 SECRETARY 1.00 1007 $14.2111 - $17.7901 $2,496.2973 - $3,063.2007
3580 2239 CLERK 1.00 1001 511.2313 - $13.9990 $1.917.7907 • $2,421.2110
3580 2299 P.T MST 4.00 903 $1.1000 - $10.5187 01,071.2000 - 01,037.1080
3580 •52.00
Ospe Job Auth
Cade Cede Jab Title Pte grass salary Ranges monthly Salary "Mes
----- ----- ---------------------- ------ ----- ------------------------- -----•--------------------
3590 6700 SOURU CONTROL MANAGER 1.00 16 $33.1153 - $66.9113 $8,731.9093 - $0,114.1117
3510 3110 ENGINEERING SUPERVISOR 1.00 l6 $30.0000 - $42.6615 $5,200.0000 - $I,399.9933
3590 311E ENGINEER 2.00 11 025.932E - $36.6023 $4,494.9640 • $6.355.9991
3590 6710 SOURCE CONTROL SUPERV. 1.00 9 123.9294 - $33.3171 $4,071.9692 - $5,116.9907
3590 3117 ASSOCIATE ENGINEER III 6.00 S $22.3560 - $31.6730 $3,811.1173 - $9,409.9617
3590 6221 PRINC. ENV. SPECIALIST 1.00 8 $33.3046 - $31.6730 $3,871.9973 . $5,409.9067
1590 311E ASSOCIATE ENGINEER II 2.00 9 $19.3557 - $27.3960 $3,354.1000 - $6.105.0000
3590 6712 SOW SOURCE CTRL INSP. 2.00 5 819.3551 • $27.3750 $3,154.9090 - $4,165.0000
3590 6714 SOURCE LTAL INSP. II 13.00 IOLS $19.5109 • $23.1235 $3,218.1510 - $4,000.0733
3990 2119 ASSOCIATE ENGINEER I 2.00 1 $17.5304 - $24.0365 $3,039.1912 - $4,304.9933
3590 6717 SOURCE CPRL INSP. 3 1.00 I010 115.9620 • $11.7554 $2.969.4131 - $3,424.2693
3590 2225 SECRETARY I.00 L007 $14.2961 • $17.7061 $2,476.2573 • $3,093.21O7
3590 671E SOURCE CONTROL TECH 3.00 1009 513.9OSO - $1Id142 $2,410.2000 - $3,001.1433
3590 2237 SR. CLERK 7.00 1002 $12.5656 - $15.6169 $2,174.5360 - $2.106.5653
3590 2299 P.T MST 1.00 503 $6.1900 • $%G.5961 $1,071.2000 - $2,037.1080
3590 66.00
Dxblelc c
Position and Salaries by Department
Data 02 NAY 1995
Dope Seb Ruse
Cede Cbdo Job Title Tsa am" Sales, Ranges Neatly sales, "Ms.
3710 3000 CIA. OF RROINRRRIND 1.00 19 $39.5189 - 9S7.6619 $6,134.9920 - $0,131.1133
3710 3333 ADNIN. SECRETARY 1.00 1013 $11.3041 - $20.3013 $2,821.1937 - $3,518.6920
3710 1215 SECRETARY 3.00 1007 $14.2061 - $15.0991 $2,479.2573 - $3,063.1907
3710 1130 U. CLERK 3.00 1003 S12.S4S4 - S1S.6198 $2,176.5340 - $2,709.5653
3910 9190 3NTERN 3.00 905 $1.3900 - $11.0400 $1,604.0000 - $2,771.3333
3010 •10.00
D"C Jab AutR
Cede Cede Job Title Ste Ore" "leey "Yagea Noetbly Salary Rongaa v
3R0 3100 ENGINEERING MANAGER 1.00 16 $33.1153 - $46.0173 $5,731.1853 - $0,114.1987
3030 3110 ENGINEERING SUPERVIS00. 0.00 16 $30.0000 $42.4615 $5,200.0000 - $7,351.1933
3930 3113 SENIOR ENGINEER 1.00 13 S38.6153 $40.0711 $4,159.9853 • 97,014.1907
3730 3114 RNGINEER 4.00 11 S39.9336 - $31.1923 $4,414.1840 - $1,351.1967
3730 3333 PRINC. MR. ASSOC 3.00 9 $23.9384 $33.3173 $4.071.1013 • $5,776.1187
3030 3117 ASSOCIATE MINERS III 3.00 9 $33.3846 - $21.6730 $3,871.9973 - $9,491.1067
3730 3333 SR. ENGINEERING ASSOC. 3.00 1036 $22.3510 - R7.8309 $3,974.1733 - $4,833.9707
3730 333E ENGINEERING ASSOCIATE 1.00 1013 $20.3013 $25.2762 $3,518.8120 • $4,381.2080
3730 3333 SR. ENGINGINEERrHO AID 3.00 1030 019.407E - $96.3565 $3,379.850T - $4,204.4600
3130 3330 ENGINEERING AIDE III 3.00 1015 $17.3053 - $21.5889 $3,006.5013 - $3,763.0587
3730 3335 ENGINEERING AIDE iI 1.00 1009 $15.7990 - $11.6215 $2,731.5600 - $3,401.0600
3720 333E ENGINEERING AIDE I 3.00 300E 916.193E - $17.1945 $2,460.1093 - $3,061.0467
3790 $399 P.T MST 1.00 103 $1.1400 - $10.S067 $1,071.2000 - 31.E37.1080
3720 •36.00
Brbibit C
Pocitioe sed Smlariee by UePsrtmeet
DR.: 02 NAT 1995
Dept Job A Ih
Cede Cede Job Title PI. G." $.lazy Ass,.. Nootbly Salary "Wes
3I90 3300 CONS9Ramom NAssa" 1.00 16 $33.1153 - $41.0173 SS,I39.9S51 - $0.114.1157
3710 3110 mbIN6ERIN0 SUPERVISOR 2.00 It 630.0000 - $42.4115 $5.200.0000 - $9.359.9911
1910 1113 SENIOR EMINSSR 2.00 13 $26.1153 - $40.6I11 $4,151.1852 - $7,014.1107
3990 3114 MIN68R 3.00 11 $25.1321 - 536.6123 $4.696.1840 - $6,159.9987
3790 3305 CNI6P CONST. INSPEMR 1.00 30 $24.6634 - $34.9321 $6.236.9693 - $6,054.1040
1190 3310 SUPP MMPR INSPECTOR 3.00 9 $23.5386 - $33.3173 $4,079.1993 - $5,774.9967
1090 3316 SR. CONSTRUCTION IMP. 6.00 1025 $21.3004 - $26.5225 $3,612.0613 - $4,617.2333
3710 IIIT CONSTRUTION INSPECTOR 11.00 1020 $11.606 - $24.2565 $3.3I9.8507 - $6.206.6600
1790 3236 SWIMMING AIDS III 1.00 1015 $11.3452 - $21.5888 $3.006.5023 - $3,942.0587
1190 3235 MGINSEIINO AIDE II 2.00 1009 $15.7590 - $11.1215 $2.I31.5600 - $3,401.0100
1790 2299 P.T ASST 1.00 103 $1.1900 - $10.5987 $1.072.2000 - $1.019.1D80
3790 36.00
I ••• 161.00
t
e JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (17): Consideration of the following actions relative to
proposed ordinances Establishing Excess Capacity
Charge Program:
District Ordinance No.
1 125
2 219
3 322
5 531
6 625
7 732
11 1121
(a) Consideration of motion to read proposed Ordinances Establishing Excess Capacity
Charge Program by title only and waive reading of said entire ordinance.Public
hearing
(b) Consideration of motion adopting proposed Ordinances.
yr
Summary
See attached memorandum dated March 22, 1995 from General Counsel.
Staff Recommendations
Staff recommends approval of proposed ordinances.
iwAooc�asNoaaasn
4
ORDINANCE NO. -
AN ORDINANCE OF THE BOARD OF DIRECTORS
OF COUNTY SANITATION DISTRICT NO. _ OF
ORANGE COUNTY, CALIFORNIA, ESTABLISHING
EXCESS CAPACITY CHARGES
. . . . . . . . . . . . . . . . . . . . . . . .
WHEREAS, the Board of Directors of County Sanitation District No. _of Orange
County, California ("District") has heretofore adopted Ordinance No. _, an Ordinance
Establishing Wastewater Discharge Regulations for Use of District Sewerage Facilities;
and,
WHEREAS, Section 309 of Ordinance No. _provides that the Board of Directors
may determine the method for calculation of Excess Capacity Charges applicable to District
users on a case-by-case basis, and
WHEREAS, the Board of Directors desires to establish a standard, fair and equitable
method for calculation of the Excess Capacity Charge for all users.
WHEREAS, the Board of Directors of County Sanitation District No. _ of Orange
County, California does hereby find:
A. That a comprehensive 30-year Master Plan of Capital Facilities entitled
"Collection, Treatment and Disposal Facilities Master Plan - 1989", hereinafter the "Master
Plan", which includes detailed financial and engineering reports, has been prepared,
approved and adopted by the Board of Directors identifying the required future
development of District and jointly-owned facilities, including the financial projections for
providing sewer service to all properties within the District's service areas; and
a
B. That District Staff has prepared an analysis report of the proposed
method for determination of Excess Capacity Charges; and
C. That the financial and engineering reports of the Master Plan and the
analysis report regarding Excess Capacity Charges have been made available to the public
and have been subject to noticed public hearings, all in accordance with the provisions of
Govemment Code Section 66016 and other provisions of law, and
D. That the revenues, derived under the provisions of this Ordinance,
from other public agencies for discharges from water or wastewater treatment facilities will
be held in reserve and designated for possible future use in the construction of a separate
ocean discharge outfall brine line, and revenues derived from other users will be used for
construction of the sewage collection facilities, wastewater treatment and disposal facilities
of the District; and
E. That the users upon which the fees established by this Ordinance are �J
levied, will discharge wastewater to the District's collection, treatment and disposal
facilities; that the costs of construction of sewage collection facilities, wastewater treatment
and disposal facilities has constantly increased due in part to increased regulatory
requirements to upgrade the treatment process; and that said costs will exceed the
amounts of any ad valorem tax revenues derived from these users; and
F. That the fees imposed by authority of this Ordinance do not exceed
the estimated amount required to provide the sewer service for which the fee is levied, as
provided in Government Code Sections 66013 and 66016, and
a000 17 Z L.J
8818 1
V
G. That the fees established by this Ordinance will not necessarily result
...
in an expansion of facilities to provide for growth outside the existing service area. The
establishment of these fees will not result in any specific project and will not result in a
direct physical change or any reasonably foreseeable indirect change in the environment,
and
H. That the fees adopted by this Ordinance are established upon a
rational basis between the fees charged each user and the facilities provided to each
affected user by the District; and
I. That the adoption of this Ordinance is statutorily exempt under the
California Environmental Quality Act from further environmental assessment pursuant to
the provisions of California Public Resources Code Section 21080(b)(8), and 14 California
Code of Regulations Section 15273(a).
NOW, THEREFORE, the Board of Directors of County Sanitation District No.
of Orange County, California, does hereby ORDAIN as follows:
Section 1: Section 309 of Ordinance No. _ is hereby amended to read:
Section 309. Purpose.
The purpose of this Ordinance is to establish the method for calculation of
fees payable by all applicants for a permit to connect to the District facilities for a new
development or expansion of an existing development that expands operations, either of
which require sewage, collection, treatment or disposal facilities capacity.
Revenues derived under the provisions of this Ordinance from other public
agencies for discharges from waste or wastewater treatment facilities shall be held in
ZOoa 17 3
`.� W18_t
u
reserve and designated for possible future use in the construction of a separate ocean
discharge outfall brine line, and revenues derived from other users shall be used for the
construction of the sewage collection facilities, and wastewater treatment and disposal
facilities of the District.
Section 309.1. Method of Calculation.
A. The Excess Capacity Charge shall apply to any new connection or new
user whose discharge is tributary to District's sewerage system and whose average daily
loading to the sewerage system contains at least one of the following loadings:
Parameter Value
Flow > 50,000 gallons per day
Suspended Solids > 105 Ibs per day
Biochemical Oxygen Demand > 105 Ibs per day
B. As set forth in the Master Plan, the historical cost of District treatment
and collection facilities for Flow, Suspended Solids and Biochemical Oxygen Demand is
as follows:
Parameter Weighted - Percent (%)
Flow 58.38%
Suspended Solids 18.66%
Biochemical Oxygen Demand 22.96%
C. The current Capital Facilities Connection Charge set forth in Article 7
of Ordinance No. _, also known as the Equivalent Dwelling Unit Rate, applicable to
dwelling units is $2,350.00, and the charge applicable to other than dwelling buildings or
300000017 4 �...�
M18 1
replacement buildings or additions or alterations to existing buildings is $470.00 per 1,000
`.d square feet of floor area, with a minimum charge of $2,350.00, based upon the District
facility cost per dwelling unit existing in 1989, adjusted automatically for inflation in 1990
and 1991 pursuant to the Engineering News Report- Los Angeles Area (ENRLA) cost of
construction index.
Section 309.2.
Effective July 1, 1995, the Excess Capacity Charge shall be calculated based
on the following formula:
Excess Capacity Charge = (Flow, gpd') /399 gpd x CFC2 x 58% +
(BOD, Ibs/d3) 10.83 Ibs/d x CFC x 19% +
(SS, Ibs/d) /0.83 Ibs/d x CFC x 23%
Section 309.3.
The Excess Capacity Charge shall not apply to public sewering agencies
located within District boundaries which agencies connect public collection sewers tributary
to District facilities.
Section 309.4.
Within two years of commencement of discharge and upon review of actual
discharge records every two years by District, if the actual loadings from a permitted facility
are shown to exceed the loadings used to assess an Excess Capacity Charge by 25% for
either Flow, Biochemical Oxygen Demand or Suspended Solids, then a supplemental
'Gallons per day
'Capital Facilities Charge as adopted by separate Ordinance of the District
3Pounds per day
zroo- 17 5
Mie_i
i
Excess Capacity Charge for the additional loadings will be assessed and collected using
the prevailing Capital Facilities Charge. No adjustments will be made for actual use below
that projected when the fee was calculated.
Section 2: Severabilily.
If any provisions of this Ordinance or application to any person or circumstance are
held invalid by order of court, the remainder of this Ordinance or the application of such
provision to other persons or other circumstances shall not be affected.
Section 3: Judicial Action to Challenge This Ordinance.
Any judicial action or proceeding to attack, review, set aside, void or nullify this
Ordinance shall be brought within 120 days of the effective date of the Ordinance.
Section 4: Effective Date.
This Ordinance shall be effective July 1, 1995
Section 5: Certification. `..�
The Secretary of the Board shall certify to the adoption of this Ordinance and shall
cause the same to be published in a newspaper of general circulation in the District as
required by law.
PASSED AND ADOPTED at a regular meeting held , 1995.
mo 17
JOINT BOARDS OF DIRECTORS
REGULAR MEETING
MAY 24, 1995
Agenda Item (18): Consideration of the following actions relative to
proposed ordinances Establishing Excess Capacity
Charge Program:
District Ordinance No.
13 1315
14 1407
(a) Open the continued Public hearing
(b) Read proposed ordinances by title only
(c) Introduce Ordinances and pass to second reading and adoption on June 28, 1995.
Summary
See attached memorandum dated March 22, 1995 from General Counsel.
Staff Recommendations
Staff recommends approval of proposed ordinances.
l\WPCOOA`.VGro'�18
ORDINANCE NO.
o . AN ORDINANCE OF THE BOARD OF DIRECTORS
OF COUNTY SANITATION DISTRICT NO. _OF
ORANGE COUNTY, CALIFORNIA, ESTABLISHING
EXCESS CAPACITY CHARGES
. . . . . . . . . . . . . . . . . . . . . . . .
WHEREAS, the Board of Directors of County Sanitation District No. _of Orange
County, California ("District") has heretofore adopted Ordinance No. _, an Ordinance
Establishing Wastewater Discharge Regulations for Use of District Sewerage Facilities;
and,
WHEREAS, Section 309 of Ordinance No._provides that the Board of Directors
may determine the method for calculation of Excess Capacity Charges applicable to District
users on a case-by-case basis; and
WHEREAS, the Board of Directors desires to establish a standard, fair and equitable
method for calculation of the Excess Capacity Charge for all users.
WHEREAS, the Board of Directors of County Sanitation District No. _of Orange
County, California does hereby find:
A. That a comprehensive 30-year Master Plan of Capital Facilities entitled
"Collection, Treatment and Disposal Facilities Master Plan- 1989", hereinafter the "Master
Plan", which includes detailed financial and engineering reports, has been prepared,
approved and adopted by the Board of Directors identifying the required future
development of District and jointly-owned facilities, including the financial projections for
providing sewer service to all properties within the District's service areas; and
B. That District Staff has prepared an analysis report of the proposed
method for determination of Excess Capacity Charges; and
C. That the financial and engineering reports of the Master Plan and the
analysis report regarding Excess Capacity Charges have been made available to the public
and have been subject to noticed public hearings, all in accordance with the provisions of
Govemment Code Section 66016 and other provisions of law; and
D. That the revenues, derived under the provisions of this Ordinance,
from other public agencies for discharges from water or wastewater treatment facilities will
be held in reserve and designated for possible future use in the construction of a separate
ocean discharge outfall brine line, and revenues derived from other users will be used for
construction of the sewage collection facilities, wastewater treatment and disposal facilities
of the District; and
E. That the users upon which the fees established by this Ordinance are
levied, will discharge wastewater to the District's collection, treatment and disposal
facilities; that the costs of construction of sewage collection facilities, wastewater treatment
and disposal facilities has constantly increased due in part to increased regulatory
requirements to upgrade the treatment process; and that said costs will exceed the
amounts of any ad valorem tax revenues derived from these users; and
F. That the fees imposed by authority of this Ordinance do not exceed
the estimated amount required to provide the sewer service for which the fee is levied, as
provided in Government Code Sections 66013 and 66016; and
100000017
W18_1 2 '�w�'
G. That the fees established by this Ordinance will not necessarily result
`..
in an expansion of facilities to provide for growth outside the existing service area. The
establishment of these fees will not result in any specific project and will not result in a
direct physical change or any reasonably foreseeable indirect change in the environment;
and
H. That the fees adopted by this Ordinance are established upon a
rational basis between the fees charged each user and the facilities provided to each
affected user by the District; and
I. That the adoption of this Ordinance is statutorily exempt under the
California Environmental Quality Act from further environmental assessment pursuant to
the provisions of California Public Resources Code Section 21080(b)(8), and 14 California
Code of Regulations Section 15273(a).
NOW, THEREFORE, the Board of Directors of County Sanitation District No.
of Orange County, California, does hereby ORDAIN as follows:
Section 1: Section 309 of Ordinance No. _ is hereby amended to read:
Section 309, Purpose.
The purpose of this Ordinance is to establish the method for calculation of
fees payable by all applicants for a permit to connect to the District facilities for a new
development or expansion of an existing development that expands operations, either of
which require sewage, collection, treatment or disposal facilities capacity.
Revenues derived under the provisions of this Ordinance from other public
agencies for discharges from waste or wastewater treatment facilities shall be held in
xooa 17 3
reserve and designated for possible future use in the construction of a separate ocean
discharge outfall brine line, and revenues derived from other users shall be used for the
construction of the sewage collection facilities, and wastewater treatment and disposal
facilities of the District.
Section 309.1. Method of Calculation.
A. The Excess Capacity Charge shall apply to any new connection or new
user whose discharge is tributary to District's sewerage system and whose average daily
loading to the sewerage system contains at least one of the following loadings:
Parameter Value
Flow > 50,000 gallons per day
Suspended Solids > 105 Ibs per day
Biochemical Oxygen Demand > 105 Ibs per day
B. As set forth in the Master Plan, the historical cost of District treatment
and collection facilities for Flow, Suspended Solids and Biochemical Oxygen Demand is
as follows:
Parameter Weighted - Percent (%1
Flow 58.38%
Suspended Solids 18.66%
Biochemical Oxygen Demand 22.96%
C. The current Capital Facilities Connection Charge set forth in Article 7
of Ordinance No. _, also known as the Equivalent Dwelling Unit Rate, applicable to
dwelling units is $2,350.00, and the charge applicable to other than dwelling buildings or
z°oa 17 4
His 1 4
replacement buildings or additions or alterations to existing buildings is $470.00 per 1,000
square feet of floor area, with a minimum charge of $2,350.00, based upon the District
facility cost per dwelling unit existing in 1989, adjusted automatically for inflation in 1990
and 1991 pursuant to the Engineering News Report - Los Angeles Area (ENRLA) cost of
construction index.
Section 309.2.
Effective July 1, 1995, the Excess Capacity Charge shall be calculated based
on the following formula:
Excess Capacity Charge = (Flow, gpd') /399 gpd x CFC' x 58% +
(BOD, Ibs/d') /0.83 Ibs/d x CFC x 19% +
(SS, Ibs/d) /0.83 Ibs/d x CFC x 23%
Section 309.3.
The Excess Capacity Charge shall not apply to public sewering agencies
`..' located within District boundaries which agencies connect public collection sewers tributary
to District facilities.
Section 309.4.
Within two years of commencement of discharge and upon review of actual
discharge records every two years by District, if the actual loadings from a permitted facility
are shown to exceed the loadings used to assess an Excess Capacity Charge by 25% for
either Flow, Biochemical Oxygen Demand or Suspended Solids, then a supplemental
'Gallons per day
'Capital Facilities Charge as adopted by separate Ordinance of the District
'Pounds per day
moo 17 5
�� Nie_i
Excess Capacity Charge for the additional loadings will be assessed and collected using
the prevailing Capital Facilities Charge. No adjustments will be made for actual use below
that projected when the fee was calculated.
Section Z Severability.
If any provisions of this Ordinance or application to any person or circumstance are
held invalid by order of court, the remainder of this Ordinance or the application of such
provision to other persons or other circumstances shall not be affected.
Section 3: Judicial Action to Challenoe This Ordinance.
Any judicial action or proceeding to attack, review, set aside, void or nullify this
Ordinance shall be brought within 120 days of the effective date of the Ordinance.
Section 4, Effective Date.
This Ordinance shall be effective July 1, 1995
Section 5* Certification. L►''
The Secretary of the Board shall certify to the adoption of this Ordinance and shall
cause the same to be published in a newspaper of general circulation in the District as
required by law.
PASSED AND ADOPTED at a regular meeting held 1995.
x000mot7
BB78 7 6 ti,J
JOINT BOARDS OF DIRECTORS MEETING
REGULAR MEETING
MAY 24, 1995
DISTRICT 3
Agenda Item (27): Consideration of the following actions relative to
Replacement of Westminster Avenue Force Main (First
Unit)and New Westside Pump Station Force Main,
Contract No. 336R:
(a) Consideration of motion approving Addendum No. 1 to the plans and specifications
for said project, making miscellaneous technical clarifications.
(b) Consideration of motion approving Addendum No. 2 to the plans and specifications
for said project, changing the date for receipt of bids from April 11, 1995 to April 25, 1995,
and making miscellaneous technical clarifications.
(c) Consideration of Resolution No. 9555-3, receiving and filing bid tabulation and
recommendation and awarding contract for Replacement of Westminster Avenue Force
Main (First Unit) and New Westside Pump Station Force Main, Contract No. 336K to
Albert W. Davies, Inc. in the total amount of$3,760,000.00.
Summary
The western portion of District No.3 drains to a collection system served by the Seal Beach Pump Station.
Wastewater from this system is pumped easterly through a dual force main system to a gravity sewer
located half-way between Bolsa Chica Avenue and Springdale Avenue. Both force mains are made of 30-
inch diameter Techite pipes. The first of these mains,the Westminster Avenue Force Main, First Unit,
Contract No.3-13,was installed in 1970,the Second Unit, Contract No.3-13-1,was installed in 1978.
The most recent of several breaks in these lines occurred on February 22, 1995. The same line
previously broke four other times. At the September 11, 1991 Board meeting,staff reported that the entire
line may need replacement.
On January 20, 1993,the Directors of County Sanitation District No. 3 authorized funding to repair and
sample both force mains and authorized Mr.Griffin to prepare a claim against the Techhe pipe
manufacturers. The claim's proceeding.
On April 14,1993,the Board authorized a Professional Services Agreement to The Keith Companies for
design and construction services for the Replacement of the Westminster Force Main and New Westside
Pump Station Force Main,Contract No.3-36R.
On March 8, 1995,the Board approved the plans and specifications and the license agreement for
construction access at the Bixby Ranch Company parking lot and authorized the General Manager to
establish the date for receipt of bids. Bids were received on April 25,1995,ten bids were received for said
contract. The bids ranged from a high of$4,581,880.23,to a low of$3.760,000.00,submitted by Albert W.
Davies,Inc. A complete bid tabulation is attached to the supporting agenda material. Staff estimated the
cost of this contract at$4.4 million (engineers estimate,plus a 10%contingency).
Addendum No. 1 Includes revising the trench backfill detail and some miscellaneous modifications and
-- technical clarifications to the plans and specifications. Addendum No.2 postponed the original bid date
from April 11 to April 25 and also includes miscellaneous modifications and technical clarifications to the
plans and specifications.
The following two actions are requested by Staff.
(1) Approve Addenda Nos. 1 and 2
Addenda Nos. 1 and 2 to the plans and specifications makes miscellaneous technical
clarifications to the plans and specifications,including supplemental additions to provisions of
the Schedule of Prices,Standard and Detailed Specifications,Appends,and Plans on said
project.
(2) Award of Contract
On April 25,1995,10 bids were receved for said contract. The bids ranged from a high of
$4,581,880.63,to a low of$3,760,000.00,submitted by Albbert W. Davies,Inc.
osn
April 17, 1995 COUNTY SANITATION DISTRICTS
If ORANGE COUNTY, Cl+UFORNIA
10EX4 ELLIS AVENUE
2.0.BOX 8127
`V FOUNTAIN VAUEY,CAL6011NIA 82728-8127
STAFF REPORT 17141962.2411
Approve Addenda Nos. 1 and 2 and Receive. File, Tabulate
Bids. and Award Replacement of Westminster Avenue Force
Main (First Unit) and New Westside Pumo Station Force
Main, Contract No. 3-36R
Summary
The western portion of District No. 3 drains to a collection system served by the Seal
Beach Pump Station located on the northeast comer of Seal Beach Boulevard and
Westminster Avenue. Wastewater from this system is pumped easterly through a dual
force main system to a gravity sewer located half-way between Boise Chica Avenue
and Springdale Avenue. Both force mains are made of 30-inch diameter Techite pipes.
The first of these mains, the Westminster Avenue Force Main, First Unit, Contract
No. 3-13, was installed in 1970, the Second Unit, Contract No. 3-13-1, was installed in
1978.
The most recent of several breaks in these lines occurred on February 22, 1995. The
same line previously broke four other times. Repair kits are becoming exceedingly
hard to find because Techite pipe is no longer manufactured. While replacing
damaged 20-foot portions of the pipe, staff was able to view adjacent pipe sections on
both sides of the broken pipe and found them cracked as well.
At the September 11, 1991 Board meeting, staff reported that the entire line may need
replacement. Staff estimated the cost to be approximately $5 to 6 million to replace
both pipes. Staff has determined that it would be most cost effective to replace the
First Unit with a new piped sized with capacity to handle flows previously serviced by
both lines. The Second Unit can be saved to provide redundancy.
In September 1991 the Board authorized staff to solicit proposals and negotiate a
Professional Services Agreement for design of Replacement of the Westminster
Avenue Force Main (First Unit), and New Westside Pump Station Force Main, Contract
No. 3-36R, formerly Contract No. 3-13R-2.
In November 1991 staff reported to the Executive Committee that information had been
obtained indica4ing that the breaks may have been due to Techite pipe being inherently
defective. The Executive Committee authorized retaining David Griffin, a Bakersfield
attorney specializing in pipe technology, to review the potential to recover costs from
the manufacturers of Techite pipe. Mr. Griffin's report indicated that both force mains
`.. are at risk of failure and that recoveries for the cost of replacing the force mains, plus
legal fees minus depreciation, are expected.
On January 20, 1993, the Directors of County Sanitation District No. 3 authorized
funding to repair and sample both force mains and authorized Mr. Griffin to prepare a
claim against the Techite pipe manufacturers. The claim is proceeding. �.
On April 14, 1993, the Board authorized a Professional Services Agreement to The
Keith Companies for design and construction services for the Replacement of the
Westminster Force Main and New Westside Pump Station Force Main, Contract
No. 3-36R. The plans, specifications and permitting for said contract are now
complete.
A no-cost easement was obtained from Bixby Ranch Company for a portion of the New
Westside Pump Station Force Main which is to be constructed outside the existing
easement within the Bixby Ranch Company parking lot. The Bixby Ranch Company
has also granted the District a License Agreement for construction access to complete
the installation of the new force main system within their parking lot.
On March 8, 1995, the Board approved the plans and specifications and the license
agreement for construction access at the Bixby Ranch Company parking lot and
authorized the General Manager to establish the date for receipt of bids. Bids were
received on April 25, 1995, ten bids were received for said contract. The bids ranged
from a high of$4,581,880.23, to a low of$3,760,000.00, submitted by Albert W.
Davies, Inc. A complete bid tabulation is attached to the supporting agenda material.
Staff estimated the cost of this contract at $4.4 million (engineer's estimate, plus a 10%
contingency).
�.J
During the bidding process, it was brought to the staffs attention by a Contractor that
the requested trench detail, which required cement sand slurry as the backfill material,
could cost the Districts approximately $1.0 million. The Districts' Project Manger and
Consultant immediately prepared alternative trench details and negotiated with the
Cities of Seal Beach and Westminster to allow for the alternative trench detail. The
alternative details calls for miscellaneous base or sand instead of slurry. This change
provides for a more economic backfill material and will speed up the construction
process. Addendum No. 1 includes this change and some miscellaneous modifications
and technical clarifications to the plans and specifications. Addendum No. 2 postponed
the original bid date from April 11 to April 25 and also includes miscellaneous
modifications and technical clarifications to the plans and specifications.
`J MAJOR COST TABLE
DESCRIPTION: Current Current Current Expended To Date:
Budget(3)• Design Costs Construction
Costs (4)•
DESIGN: CONSTR:
Planning &Studies N/A N/A N/A N/A
Consultant's Cost $ 200,000 (1)` $ 85,683 $75,509
CSD Design Costs $ 41,000 $ 41,000 $29,340
Contractor Costs $4,600,000 (5)• $4,072,154 (4)•
CSD Construction Costs $ 130,000 $ 130,000 $75,544
Furnishings and Equipment
(2)' N/A N/A NIA N/A N/A
Agreement Costs N/A N/A N/A N/A N/A
Permit Costs N/A N/A NIA N/A N/A
Contingency @ 10% N/A $ 400,000 NIA N/A N/A
Total Costs: $4,971,900 $4,598,967 N/A
'NOTES:
(1) Includes all approved changes to original PSA
(2) Furnishings and equipment are not considered capital project costs and
Hence are not actually a part of the project design and construction costs.
The Districts purchases furniture and equipment after construction is
complete under a separate contract.
(3) Includes all approved changes to original budget
(4) Includes all approved changes to original contract
(5) Consultant's estimate of construction cost.
Staff Recommendation
Staff recommends approval of Addenda Nos. 1 and 2 and award of the contract to
Albert W. Davies, Inc. for their low bid of$3,760,000.00.
sR0407.95
COUNTY SANITATION DISTRICTS
April 25, 1995 RI ORANGE COUNTY, CALIFORNIA
11:00 a.m.
2 Addenda IOW ELLIS AVENUE
V a.BOX 9127
`/ R I I) T A R I I I A T I n N FOUNTAIN VALLEY.CALIFORNIA 89728.8127
9141902.2411
Contract No. 3-36R
PROJECT TITLE: 8npAr mane of the W.¢tminet.r Avenue Fnrra Main (Firm Ilnitl And Naw
WAgI P„mn Rtatlnn Fnrra Main
PROJECT
DESCRIPTION: Inman 14 Ann nnAar fan,of 42--Inch d„maA trno n pa and An NnAar feat of
7r1:neh d iel 1. 'rnn pipe In WAArrninatA/ Avanun and at the Wamaid. Fh,mp-
Statinn, JAMM NvAlvtivAly
ENGINEER'S ESTIMATE: 64.400000 BUDGET AMOUNT: 64_971 nno
TOTAL
CONTRACTOR BID
1. Albert W. Davies, Inc., Rancho Cucamonga, CA $3,760,000.00
2. Mladen Buntich Construction Co. Inc., Sunland, CA $3,777,347.00
3. Kenko Inc., dba McGrand and Associates. Calimesa, CA $3,864,817.00
4. Schlumberger Ind., Inc., Santa Fe Springs, CA $3,872,490.00
5. Mike Prlich & Sons, So. El Monte, CA $4,065,080.00
6. E. J. Meyer Co., Highland, CA $4,111,111.00
7. Colich& Sons. Gardena, CA $4,215,726.00
8. Southern California Underground, Brea, CA $4,297,790.00
9. Nick Tomovich & Son, Inc., El Monte, CA $4,549,570.00
10. Sully-Miller Contracting Co., Anaheim, CA $4,581,88O.63
1 have reviewed the proposals submitted for the above project and find that the low bid is a responsible
bid. I, therefore, recommend award to Albert W. Davies, Inc., in the bid amount of $3,760,000.00 as
the lowest and best bid.
ohn D. i der
Director of Engineering
"MoO/
JOINT CHAIRMAN'S REPORT
5/24/95
1 ) Two orientation meetings have been planned for all
Directors on the policies and operations of the
Districts. These have been scheduled for Saturday,
June 3rd and Saturday, June 17th from 9 a.m. to 1
p.m., and will include a tour and a light lunch. I'd like
to encourage all Directors to attend, especially if you
haven't had a recent tour of the plant. If you haven't
returned your response form and you plan to attend
one of the sessions, please notify the General
Manager's secretary as soon as possible.
2) In the General Manager's Board Letter, you all have
been invited to take a cruise on the Districts'
monitoring vessel, The Enchanter. If you are
interested you should contact the General Manager's
office. When the dates have been finalized, a notice
I
will be sent out so that you can indicate your
preferences. This is an excellent opportunity to learn
more about the Districts' marine monitoring program.
3) Upcoming Meetings
A. The Planning. Design and Construction
Committee is scheduled to meet on Thursday.
June 1 st, at 5:30 p.m.
B. The Ad Hoc Committee re Space Utilization
Study for Administrative Employees is scheduled
to meet Friday. June 2nd. at 4 p.m.
C. The Operations Maintenance and Technical
Services Committee is scheduled to meet on
Wednesday, June 7th at 5:30 p.m.
D. The Finance Administration and Human
Resources Committee is scheduled to meet on
Wednesday. June 14th. at 5:30 p.m.
2
E. The Executive Committee is scheduled to meet
on Wednesday June 21st at 5:30 p.m.
3
MEETING DATID May 24, 1995 TIME: 7:30 p.m. DISTRICTS: 1 ,2,3,5,6,7, 11 , 13 and 14
DISTRICT 1 JOINT BOARDS
ZHENO) . .. MC GUIGAN ... . . . .. gf — IBOMIMANJ .. ... .. .... AGE ... .. .. .... . . .
PERRY) FERRYMAN ...... . . ILASZLO I ............ BROWN ... ........
JCOONTZJ ........... MURMY ... ....... (GCOrn ............. COLLINS ..... ..... .
(POM) ............ SALTARELLI .. ...... 7 MEGAYI .. .........I. COX . . . ..... ... .. _Ae
IS . . . .. . .. ... STANTON .. ...... . (COM �. . ............. DESAY ........... .
IBA UM DENTS .......
IBAUM . .. .......... DETTLOM .....
DISTRICT 2 (PARKER( ............ DUNLAP ..........
ISCOM .... .... .... COLLINS . ... ... ... . (DOWNEY)............ ECKEPIRODE ....... .Ae
IGVLLIXSONI ......... WELCH ... ........ .je (PERRYI .. ........... FERRYMAN . .......
Jr —
IBELLI . . I .. ... ...... DENTS . ........... -ile IANDERSON) .......... ........... .
IPARKER? ........... DUNLAP. .......... IMARSHAW .......... GRIFFIN ........... .Ae
(DOWNEY I .......... ECKENRODE :.....:. IWELCHI .. ........... WU.IXSON . ....... .Ae
LANDEASONI ......... .... ..... . (WARDI . ............ HAMMOND ........ .Mc
(MORENO) ........... MCGUIGAN . ....... . . . (BAUER) . . ........... WIMIG . .......... ..e
(COONTi5 .......... . MURPHY . ...... ... .me (MINER) ............. LINN ..........
INORSYl . .......... . SA .............. _,,f , (MORENO) ............ AN DUMAN.....
fZI-AKM. . .......... SINGER ........... .Ae (COONUI ............ MURPHY ..........
ISMNER) . .......... STANTON ......... IOUNLAM . ........... PARKER. ........ .. .dL,
IDALYI � . . ......... . ZEMEL . ........... (EMMONI ........... RICE ICE
:::....
(HORSY) ............. SA .. ..... ....
DISTRICT 3 (POTRI) ............. SALTARELU....
IDOTSONJ ......... .. SAPIEN .......... . (OOTSONI ............ SAPIll ....
(PARKER) ....... . . D IZLAKETI .. ........... SINGER .. ..
..
(BOWMANI ........ .. AGE . .. STEINER).. . .......... STANTON ..... ... . ..
-.::::--- _JQd
UASZLO) .......... . BROWN fSTANTONI ........... STEINER ..........
ISCOrn ........... . COLLINS (MILLER) . ............ SWAN . ........... .oe _ _
IAWERSONI ......... -A,-, IWAHILSTROMI ........ SYLVIA ...........
(MARSHALLI ...... ... GRIFFIN ... �QULLIXSON) . ......... WELCH . .......
(BAUERP ............ LEIRIG . .. DALY) ... . . ......... ZEMEL . .......
MINERI ............ LIN. . ..... ....... .
(MORENO) ........... MCGUIOAN ........ .
JEPPERSONI.......... AIM STAFF OTHER
(NORBY4 ANDERSON WOODRUFF
RLAKEIR...... ..... SINGER HASENSTAS DEMIR . . .... .�
GITEINMO ........... STANTONHODGES . . . KNOW ..... —
RNAHUSTIIOMJ ..... . SYLVIA . .......... je JONK . .. .. ME. . . ..... ..e
JDALY) .......... . ZEMEL .. .......... .A[ KYLE ... . .
DISTRICT MNDER . NIXON T.ROM ..
LICINT E. . ✓
SHAW .....
(COX) .... IMELL . . . .....
.......... mmy . ........... I Y . . STONE .....
(STANTON) ....... SIMASS........... . OOTEN . .. :
JOEBAYJ . ......... .. COX ............. 7 STREED .. . ... ..
TALESI . .. . . ... ......
DISTRICTS TOMES . . . . .. . .. .
VERRYI ............ FERRYMAN........ ......... . . VNCENT ... . .. . . . . . . .
ICOX) ........... ... DISSAY . .......... . .at WINSOR
(STANTON) ....... ... .......... .
DISTRICT 7
(WARD) . ........... HAMMOND.........
POTTS) ............ S
(PERRY) ............ DEBAY... ...... . .. ..
JPERRY) .... ........ RRRYMAN...... ... ...
IMORENOI ... ... ..... MCGUIGAN ..... . .. ..e
COONTM .......... . MLIRPHY. �V4
ISTANTON) ........ . . SMINIMP
DISTRICT 11
(SAUER) . ......... . . LEIRIG . ..........
(SAUERJ ............ DETTLOFF
(STEWERI .. ... . ..... . .......... . :z
DISTRICT I
RVELCHI .... .... . ... GULLIXSON ....... . ..
JOUNLAM . . ... .... .. PARKER .. ......... .
(COONT23 . . . .. . ... .. MURPHY ...... ... .
(STANTON) . ...
(DALY) . . .. ... ... . .. ZEMEL .. . ...... ...
DISTRICT 14
(MTTS) . . . .. . .. . .. . SALTARELLI ..... .. .
IWARD) . . . .. . ...... HAMMOND. ..... . . . .
(COONTZI . ... . ..... . NL
DLI02
(STANTON) ... . .....
(MILLER) .. .. ... . . . . . SWAN . . . 04110195
05/24/95 -JOINT BOARD MEETING
#4(a-(I) -Annual election of Chair and Chair oro tem of the Boards:
JC: Tonight is the night for election of Chair and Chair pro tem for individual districts. We
go through by each districts for nominations. Just to remind everybody, in your packet
there is a listing of directors for each district and the first one is the current chairman, the
second one is the chairman pro tem. Starting with District 1, do we have a nomination?
Pat McGuigan is the current chair. Any other nominations? Seeing none, I'll move that
they're closed, even though I can't. Pat, you're in. Chairman pro tem, Jim Ferryman is
current, any opposition to that? We'll consider Jim and Pat. District No. 2, John Collins is
current Chair. Motion for nomination? Nomination for John Collins, seeing none, you're
continuous chair of District 2. Dan Welch is Chair pro tem currently, any nominations?
Any other nominations? Seeing none, Dan you're pro tem District 2. District 3, Sal
Sapien is current Chair, any other nominations? Seeing none, Sal you're it again. Do
we have a Chair pro tem, motion to close nominations. Bemis Dunlap is Chair pro tem
District 3. District 5, Jan Debay is current Chair, I will nominate Jan, no others.
Therefore, Jan you're the Chair. It will be Steiner, so that's taken care of. District 6, Jim
Ferryman is current Chairman, seeing no other nominations, Jim you're continuous
Chair. Chair pro tem, OK Jan you're vice chair. District 7, OK any other nominations,
seeing none. Barry you're chair of District 7. Chair Pro Tem, any other nominations?
Tom, you'll continue. District 11, Vic is current Chair, seeing no others, I will recognize
Vic as a continuation. Vice Chair, seeing no other nominations, you're it Shirley. District
13—no quorum. District 14, Tom Saltarelli, any other nominations, seeing none, Tom
you'll continue. Vice Chair, I have a nomination for Mark Murphy, any other nominations,
seeing none, Mark you're vice chair.
#6 - Public Comments
Give us your name and what the subject is. My name is Jerry Grubil and I have a project
with the City of Orange, and I have requested two times to meet with this Board. I have
a sewer rights issue. The reason I have to get on this thing is because I have rebars
sticking up out of the ground and I don't have a permit today and it's getting important
that I get this resolved. I bought a property and it had sewer rights and the permit was
paid in 1914 and it's been paying taxes ever since. When I purchased the property I
believed I purchased the entitlements therein. I've been trying to get a permit and I'm
getting held up because I have not paid my fee. I've worked with staff trying to get that
resolved and I was postponed again tonight so what I did was I brought a demolition
permit from a prior project or commercial structure. I have that with me. It was demo'd in
1989 and I am building a new structure which is about half the size as the old structure. I
would be using the same lateral, and would not increase, in my estimation, the sewer
discharge so I'm asking that that fee be waived. This impact has been with the County
since 1914 and I simply ask that I be exempted or be allowed to move forward due to the
facts as they are. The City, with Mr. Murphy, has helped me do the same with the
transportation fee, the school district has done the same and all the other people that I
1
have had entitlements with had transferred this projects or fees and entitlements from
former project to this project. That's my request.
(?): Mr. Chairman, let me suggest that you meet with appropriate staff members and I'm
not sure who that is, would that be John and Ed? Talk with them before the meeting is
over and see if we can get some closure on this issue before this meeting is concluded
perhaps we could get a recommendation from the staff.
Mr. Grubil: That would be great because tomorrow I really have to get a permit, it's
getting serious here. It's District 2, the letter I have said it would meeting, well it says
May 28 but that's not right, it was tonight, at 7:30 p.m. It's on the corner of Pixley and
Chapman Avenue on west Chapman, but it says District No. 2.
TLW: I think Mark has been involved and John Linder. We're familiar with this, John
Linder has been working on this trying to get it resolved. We have somewhat of a tough
issue, one of the ways I had suggested that we may be able to address, is we need to
get some calculations based on the ordinance, the square footage exceeds what was
there at one point, if its less than what was there it's a different issue and different result.
John's been working on that, do you want to comment?
Linder: Right at this point in time we believe the square footage of the new building is
less than the original building, but what we don't have in our hands is when the actual
demolition occurred of the original building and we don't have the actual square footage
although we believe it's less than the current. We talked to the city verbally and the
information we got does not satisfy us to this point so we have to go up there and
physically get that information ourselves.
Mr. Grubil: I have that information today, I have a former appraisal on the old property
which was done because the city took it in an eminent domain so the appraisal was
ordered. The appraisal states that the former property was in physical working condition
and fully leased 4,455 square feet; the new project consists of 2,206 for a net change of
negative 2,249 square feet. So this property is actually that much smaller than the
former project. Same water meter size.
JC? It's not possible for this Board to take action tonight on a non-agendized item but 1
think we want to get you together with John and try to get this worked out.
Grubil: Anything we can do to speed this up? This is the second time I've tried to get this
on calendar and it got postponed again and there is a sense of urgency on my part
because I don't like having sticks sticking up in the air and I can't get a permit, if I can't
get a permit I can't get an inspection.
JC: John see what you can do.
Linder: He's shown me the information that he has and it may be accurate, I just have to
2
verify it.
JC: Maybe Mark can help you too with the city with what they've done in Orange.
TLW: The issue that we need to find out, the date the building was demolished. The
property was condemned by the City, but I'm sure it wasn't demolished the next morning
and unfortunately we have about a 4-5 month window and if the City took their time it will
flow to the benefit of this applicant. If they didn't, the applicant may be late and that's the
issue we have to resolve. The ordinance provides that if someone wishes to come in an
obtain a permit for a new facility, the application must be made within two years of the
date of demolition of the old unit. The City acquired this about 2 years and 5 months
ago, but I don't know and we've been unable to ascertain—I saw that as an issue and
said well, if it's within 2 years, fine, and that is what John is trying to verify with the City of
Orange.
Grubil: Mr. Murphy, also the water district in addition to the school and City. In the City of
Tustin, and Saltarelli knows this, we had two sewer laterals on a project I just did with
four homes and one sewer lateral was installed but never hooked up in 1958 or 59. Two
sewer laterals, we made four lots. One was never hooked up, one was, to the existing
home, so we had two additional. We were charged for the two additional laterals, but the
two—even though one was never hooked up we weren't charged for it. Norm's got a
question here first.
TLW: It's the Sanitation District 2 connection fee ordinance. We've not had this precise
issue, but we've had the issue before of waiving fees for retirement homes, etc. and it's
an ordinance and therefore you don't have the authority to waive the ordinance. You
either have to amend the ordinance and let this happen, or have to find some other
procedural mechanism, but it's not within the power of your staff or even the Board to
say we're going to forgive the law. That's why I was trying to fit it within two years and
that's why we need . We don't have a variance procedure in our statutes and
ordinances. We can expedite this in one fashion. Worst case scenario is Mr. Grubil can
place the money down while this Board ultimately comes to grips with the procedure, so
he doesn't get held up timewise on his project, and he's bound by whatever decision. At
least I think we can get him out the door with a permit.
JC: We'll revisit this later with District 2 if we can work something out. Let' s go back to
item No. 4, District 13 does have a quorum.
#4 -
JC: Do we have a nomination for Chair of District 13, any other nominations. Recognize
John as the Chair. How about Vice Chair? Bob Zemel, any other nominations? Seeing
none, Bob you're the Vice Chair. Let's move onto reports. My report, a remind that we
have orientation meetings scheduled for Saturday June 3rd and 17th, 9:00 a.m. to 1:00
p.m. I encourage everybody who can to come to one of these orientations. It's useful to
3
get briefed as to what the Districts look like, what the new construction projects are, and
so forth. If you haven't turned in your responses for one these sessions, be sure to notify
Jean Tappan, the Secretary to the General Manager, that you'll be there. I really want
you to make every effort to do that, if you would please. Any questions about it? Jan.
These are long sessions. The boat availability needs to be worked out, but the Districts
motor vessel, the Enchanter, we've talked about this before, people who are interested
going on shore to see our testing facilities--if you're interested in that program, let Don or
his office know so we can figure out what kind of group we're going to have and put a
time together for that. But it would have to be another time. Other city officials on the
Enchanter? I don't know, why not? I would suggest you make the request. We'll see
how many board members want to go—they have first priority, that's all. Other questions
about the Enchanter trip?
Upcoming meetings.
Planning, Design and Construction Committee - Thursday, June 1, 1995, 5:30 p.m.
Ad Hoc Committee on Space Utilization for Administrative Employees - Friday, June 2,
1995, 4:00 p.m.
Operations, Maintenance and Technical Services Committee -Wednesday, June 7,
1995, 5:30 p.m.
Finance, Administrative and Human Resources -Wednesday June 14, 1995, 5:30 p.m.
Executive Committee - Wednesday, June 21, 1995, 5:30 p.m.
The Board meeting and the Steering Committee would meet again on the 28th. Moving
on to the General Manger's report.
GM: Mr. Chair, the only thing I have is to, again, with apologies to the joint boards say
that agenda item Nos. 13(b)(5), (6) and (7) need not be on here because they are less
than $50,000 and it has been handled by the committee, and these three items have a
way of persisting in--those have been handled. Tom, do you have a report on—
Move on to general counsel's report.
TLW: Just a couple of things. We have a closed session later and a couple of those are
placeholders. We really are only going to talk about 19(b)(3) and (b)(5). The only other
points I'd indicate to you is the GM and Asst. GM and I were all just recently at the
Association of Metropolitan Sewering Agencies (AMSA) and I think each of us will
probably be giving more of a update or heads-up type report as to what was going on,
but it was really enlightening and informative relative to where the federal government is
going not only from the perspective of the Contract with America, but from the
Administration's perspective on various programs, including the clean water act. I had
the opportunity yesterday for three visits with the offices of Senators Feinstein and Boxer
4
and the committee from the Senate on the public works that's going to handle it. The
Clean Water Act is probably not going to see daylight this year, and I was thinking it was
going to whip through the House of Representatives at an unprecedented speed and
fashion, but it's probably 5th or 6th on the priority list behind clean/safe drinking water,
clean air, rick rods (?) , Superfund, for the Senate so they may not even see it this year
at all, and maybe 2 years Congress-wise, probably go next year. But we will need to do
it and the programs were generally beneficial.
#8 - Minutes:
JC: If there is no objection, I'll deem them approved as sent out, unless I hear otherwise.
#9 - Ratification of Claims
PK: The motion carries, Mr. Chairman.
#10 - Consent Calendar:
JC: 10(a) and (b). Moved, seconded. Mark Murphy is abstaining on 10(a). Any
opposition? With that note, consider it unanimous.
#12 - Receive, file and approve Staff Summary Financial Report
JC: for the 9 month period (ending March 31, 1995). Any opposition? Consider that
unanimous.
#13a - minutes of the Executive Committee
JC: I'd move that first, any apposition? Consider that unanimous.
#13b - 1-12:
JC: This represents all of the items that have been before the three committees and the
executive committee. If there is any director that would like to pull one of these for
discussion, we could certainly do that. Otherwise, I would entertain a motion to move of
all of them. We have a motion, second; any opposition? That's passed.
#14 - Update by staff and consultants concemino developments related to the county's
Comminaled Investment Pool
JC: This was a placeholder for the commingled investment pool. There's really not much
of a report to have unless you have questions. We received our money as you have all
heard, not all of the money, just the first installment.
TLW: We have received statements for services through March only, and to date those
5
services, the gross amount was $238,704. From that sum has been deducted a total of
$17,557, that I just didn't approve for a variety of reasons, mostly in terms of cost and
whatever and some time that was charged to this District and shouldn't have been. In
my opinion it should have been charged to the committee. That's for Bronson Bronson
and McKennen. The charges to my office were $74,153 total. By letter dated May 17th,
by the way, I sent a letter to Bronson Bronson and McKennen effectively telling that
we've pretty well had all the work we need for them and to stop the clock. I don't really
foresee that we'll need a great amount of solvency counsel work from them. I didn't
terminate them per se or totally. I've reviewed it with Blake and Don. The idea being,
though, that from our perspective now, everything is moving into the other case, and it
will be a matter of litigation against the brokers and whatever, and all of the public
agencies are going to be represented by a team of three lawyers and three law firms and
our interest will be there. They're no better, no worse. We're not doing it alone and so I
just saw no reason to keep Bronson Bronson on the clock. But they're available as we
may need them and one thing came in today that I probably am going to ship up to them
asking them to look at it because I couldn't understand it; it truly was a bankruptcy
document. Any other questions?
#15 -#16 - Changing the regular Joint Board meeting date from Wednesday. November
22, 1995 to Wednesday November 15, 1995 at 7:30 o.m. due to the Thanksgiving
holiday: changing the regular Joint Board meeting date from Wednesday. December 27,
1995, to Wednesday. December 13, 1995 at 7:30 p.m. due to the Christmas Holiday
JC: We can take these together. This is just moving the meeting dates in November and
December away from the holidays. Do we have a motion, second? Any opposition?
Consider that unanimous.
#17 - actions relative to proposed Ordinances Establishing Excess Capacity Charge
Program
JC: We have to take these individually by District. This is establishing the excess
capacity charge program. We've been through this discussion. Do we need a staff
report? If not, then District 1 we need a motion and second on item a. Any opposition?
Seeing none, consider that unanimous. District No. 2, any opposition? We'll consider
that unanimous. District No. 3, any opposition? Consider that unanimous. District No. 5,
second, no opposition, consider that unanimous. District No. 6, 1 have a motion on 6, do
have a second? Consider that unanimous. District No. 7, any opposition? Consider
that unanimous. District No. 11, any opposition? Consider that unanimous.
#18 actions relative to proposed Ordinance Establishing Excess Capacity Charge
Program - Districts No. 13 and 14
JC: This, too, is establishing the excess capacity charge, but in this case we have to
open up the public hearing. Tom, do you have any report on this item?
6
TLW: Very briefly, what this is--for Districts 13 & 14—the reason we're here for the first
reading is because the lack of quorum at the last months' meeting. The excess capacity
charges are identical and same structure as each of the other 7 districts, and to provide
for those instances where there are reconstruction and fees are needed based upon a
load that's placed on your system. The charges are the same as the other 7 districts.
We've had no written correspondence that I'm aware of on the public hearing portion.
Clerk will verify that.
JC: Any questions? Any oral comments? Seeing none, then we move on to District 13,
a motion for approval. Any opposition? Consider that unanimous. District 14, any
opposition? Consider that unanimous.
We are—two closed session. I think it might be convenient to get rid of Item No. 27, if I
may indulge you, which is District No. 3 only, which has to do with
#27 -action relative to Replacement of Westminster Avenue Force Main (First Unit) and
New Westside Pump Station Force Main, Contract No. 3-36R:
JC continued: We need an action from District No. 3, or do you want a staff report?
Moving A, B, and C. Any opposition? Consider that unanimous. Back to closed session
then--Maybe they can do that when we come out of closed session, we can deal with
that. They can address that when we're in closed—
Director Roger R. Stanton arrived at 8:07 p.m.
#19 -Closed Session:
JC: So let's move into closed session, and we can excuse everybody in the room except
directors and staff that's involved in this. This will be items B(3) and B(5) that we are
addressing.
7
EXCERPTS FROM THE MINUTES OF THE�EGULAR
JOINT MEETING OF THE BOARDS OF DIRECTORS OF COUNTY
SANITATION DISTRICTS NOS. 1, 2, 3, 5, 6, 7, 11, 13 AND 14
OF ORANGE COUNTY, CALIFORNIA
A regular joint meeting of the Boards of Directors of County Sanitation Districts Nos. 1,
2, 3, 5, 6, 7, 11, 13 and 14 of Orange County, California, was held at the hour of
7:30 p.m., May 24, 1995, at 10844 Ellis Avenue, Fountain Valley, California.
The Chair of the Joint Administrative Organization called the meeting to order at
7:30 p.m.
The roll was called and the Secretary reported a quorum present.
. ...........
ALL DISTRICTS (OMTS9M25)
Actions re Santa Monica Bay Restoration
Project (SMBRP) epidemiological survey
Authorizing the Districts' participation in the
Santa Monica Bay Restoration Project (SMBRP)
epidemiolooical survey
Moved, seconded and duly carried:
That the Districts' participation in the Santa Monica Bay Restoration
Project (SMBRP) epidemiological survey, be, and is hereby, authorized.
Authorizing the General Manager to enter into a
Memorandum of Understanding (MOU)with SMBRP
and to enter into a contract with the State Water
Resources Control Board (SWRCB)
Moved, seconded and duly carried:
That the General Manager be, and is hereby, authorized to enter into a
Memorandum of Understanding (MOU)with SMBRP; and,
FURTHER MOVED: That the General Manager, be, and is hereby,
authorized to enter into a contract with the State Water Resources Control
Board (SWRCB) to implement said MOU, and to reimburse the Districts
for an amount not to exceed $180,000.00 for costs associated with labor
and materials to analyze virus samples and continue in-house efforts
during this project period through a Specific Term Employment
Agreement, in form approved by General Counsel.
Authorizing the General Manager to enter into a
six-month Specific Term Employment Agreement
for a Laboratory Analyst
Moved, seconded and duly carried:
That the General Manager, be, and is hereby, authorized to enter into a
six-month Specific Term Employment Agreement for a Laboratory Analyst,
at a rate not to exceed $25.00 per hour, for a total amount not to exceed
$26,000.00.
Authorizing the General Manager to enter into
additional contracts. as necessary, to implement
the terms of the MOU
Moved, seconded and duly carried:
That the General Manager, be, and is hereby, authorized to enter into
additional contracts, as necessary, with no increase in the authorized
amount of$180,000.00 to implement the terms of the MOU.
STATE OF CALIFORNIA)
)SS.
COUNTY OF ORANGE )
I, PENNY KYLE, Secretary of each of the Boards of Directors of County
Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County, California, do
hereby certify that the above and foregoing to be a full, true and correct copy of minute
entries on the meeting of said Boards of Directors on the 24th day of May, 1995.
IN WITNESS WHEREOF, I have hereunto set my hand this 8th day of May,
1996.
/ N" -'
Secretary of tl Boar of Directors of
County Sanita ion Di ricts Nos. 1, 2, 3,
5. 6, 7, 11, 13 and 14
J:WPDOCTSTORMS W 1F030596.1
I
w(
i
Y
COUNTY SANITATION
~` DISTRICTS NOS. 1, 2, 3, 5, 6, 7, 11, 13 AND 14
OF
ORANGE COUNTY, CALIFORNIA
MINUTES
JOINT BOARD MEETING
MAY 24, 1995
� S`oNp\SZRICiS Of09gy
y2 � no
G
ti Z
z �
� a
v.rw
OI�cT�N�HE ENS\Pp��
ADMINISTRATIVE OFFICES
10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708-7018
ROLL CALL
A regular meeting of me Boards of Directors of County Sanitation Districts Nos. 1.2. 3, S. 6,
7, 11. 13 and 14 of Orange County, Calilomia,was Hold on May 24, 1995,at 7:30 p.m.,In the
Districts' Administrative Offices. Following the pledge of Allegiance and invocation Via roll was called
• and the Secretary ropened a quorum present for Districts Nos. 1. 2. 3, 5,6.7, 11, 13 and 14 as
follows:
ACTIVE ALTERNATE
DIRECTORS DIRECTORS
OLSTNCT NO. 1: g Pot MCGuigen, Chair _ Ted R.Morena
x James M.Ferryman,Chair pro tam _ AMur Pony
y Mam A.Mummy — Joanne Cannot
Thomas R.Sabrelli Jim Potts
Roper Stamon Wilburn G.Steiner
DISTRICT NO.2: _� John Codes. Clair George Seen
g Cereal T.Watch,pair pro tam John M.Gullzson
Barry Der49 Bob Ben
Burns Dunlop Glenn Parker
1_ Norman Z.Edsairsom Carol Downey
_ James H.no. Steve Anderwn
i Pat MCGuigen Ted R.Moreno
Mark A.Murphy Joanne Delhi
Julie Sa Chris Nomy
x Sheldon Singer George L.Zaket
Roger Stamon Wlliem G.Seems,
x Bob genial Tam Daly
DLSTRICT NO.3: y Sal A.Samun, Chair Henry M.Dotson
1 Burma Dunlop. Chair pro men Glenn Parker
1 Cecilia Ape Walter Bowman
x _ George Brown Frank Laszlo
John Collins George Seen
_ James H.Flora Steve Anderson
�. Don R.Griffin patsy Marshall
Victor Leipsig Ralph Bauer
y Wally Use _ Eva G.Miner
1 Pat McGuigan Ted R.Morene
J{_ Merge L.Nos Grace Epperson
Julie So Chns Nomy
Sheldon Singer George L.Zlakat
g Roper Stamon Wliam G.Steiner
g Charles Sylvia Robert Wahummin
x Bob Zemel Tom Daly
DISTRICT NO.6: a Jan Debay,Chair John C.Colo,Jr.
_ Wllam G.Steiner,Chair pro tam x Roger Stamon
Jahn C.Coe,Jr. Jeri Debay
DISTRICT NO. 6: Z James M.Ferryman,Chair Anhur Perry
g Jan paper,Chair pro Lem John C. Colo,Jr.
William G.Stainer Roger Stamon
DISTNCT NO.7: x Barry Hammond,Chair Mike Ward
g Thomas R.Battered,Chair pro tam Jim Potts
x Jan Debay John C.Colo,Jr.
. James M. Ferrymen Arthur Pony
y Par McGapan Ted R.Mores
Mark A. Murphy Joeva Coanta
William G. Steiner �_ Roger Stamon
DISTRICT NO. 11: S� Victor Lelpog.Chair Ralph Bauer
Shirley Gambit,Chan Dm tam Ralph Boom,
g Roper Brenton Wlliem G.Steiner
DISTRICT NO. 13: g John M.Golliasen, Chair Daniel T.Welch
y Bob Zemel.Chan sm tam Tom Daly
Mark A.Murphy Joanne Cables
1 Glenn Parker Bumie Dunlap
William G.Steiner t Roper Shorten
DISTRCT NO. 14: 1 Thomas R.SeNarelli,Chair Jim Potts
Mark A.Murphy. Chair pro tam i.e. ComeII
Barry Hammond Mike Ward
_ Wllem G.sleiner a Roger Stamon
_y Piker A.Swere Darryl Miller
-2-
05/24/95
STAFF MEMBERS PRESENT: Don McIntyre, General Manager, Blake Anderson,
Assistant General Manager, Penny Kyle, Board
Secretary, John Dettle, Gary Hasenstab, Irwin
Haydock, Ed Hodges, Patricia Jonk, John Linder,
Charles McGee, Pat McNally, Mike Moore, Bob
Dolan, Misha Rozengurt, Gary Streed, Ed Torres
OTHERS PRESENT: Thomas L. Woodruff, General Counsel, Jamel
Demir, Mary Lee, Phil Stone
DISTRICT 1 This being the annual meeting at which elections
Annual Election of Chair and Chair pro tern are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tern of the Board of Directors of County Sanitation District No. 1.
It was then moved: That Director Pat McGuigan be nominated as a candidate for the office of
Chair. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director McGuigan as Chair.
It was further moved: That Director James M. Ferryman be nominated as a candidate for the
office of Chair pro tem. There being no other nominations, the vote was polled and the Secretary
cast the unanimous ballot for Director Ferryman as Chair pro tem.
DISTRICT 2 This being the annual meeting at which elections
Annual election of Chair and Chair pro tem are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tem of the Board of Directors of County Sanitation District No. 2.
It was then moved: That Director John Collins be nominated as a candidate for the office of Chair.
There being no other nominations, the vote was polled and the Secretary cast the unanimous
ballot for Director Collins as Chair.
It was further moved: That Director Daniel T. Welch be nominated as a candidate for the office of
Chair pro tem. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Welch as Chair pro tem.
-3-
05/24/95
DISTRICT 3 This being the annual meeting at which elections
Annual election of Chair and Chair oro tem are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tern of the Board of Directors of County Sanitation District No. 3.
It was then moved: That Director Sal A. Sapien be nominated as a candidate for the office of
Chair. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Sapien as Chair.
It was further moved: That Director Burnie Dunlap be nominated as a candidate for the office of
Chair pro tem. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Dunlap as Chair pro tem.
DISTRICT 5 This being the annual meeting at which elections
Annual election of Chair and Chair pro tem are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tem of the Board of Directors of County Sanitation District No. 5.
It was then moved: That Director Jan Debay be nominated as a candidate for the office of Chair.
There being no other nominations, the vote was polled and the Secretary cast the unanimous
ballot for Director Debay as Chair.
It was further moved: That Director William G. Steiner be nominated as a candidate for the office
of Chair pro tem. There being no other nominations, the vote was polled and the Secretary cast
the unanimous ballot for Director Steiner as Chair pro tem.
DISTRICT 6 This being the annual meeting at which elections
Annual election of Chair and Chair pro tem are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tem of the Board of Directors of County Sanitation District No. 6.
It was then moved: That Director James M. Ferryman be nominated as a candidate for the office
of Chair. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Ferryman as Chair.
It was further moved: That Director Jan Debay be nominated as a candidate for the office of Chair
pro tem. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Debay as Chair pro tem.
`ft� -4-
05/24/95
DISTRICT 7 This being the annual meeting at which elections
Annual election of Chair and Chair Pro tem are to be held for Chair and Chair pro tern of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tem of the Board of Directors of County Sanitation District No. 7.
It was then moved: That Director Barry Hammond be nominated as a candidate for the office of
Chair. There being no other nominations, the vole was polled and the Secretary cast the
unanimous ballot for Director Hammond as Chair.
It was further moved: That Director Thomas R. Saltarelli be nominated as a candidate for the
office of Chair pro tem. There being no other nominations, the vote was polled and the Secretary
cast the unanimous ballot for Director Saltarelli as Chair pro tem.
DISTRICT 11 This being the annual meeting at which elections
Annual election of Chair and Chair Pro tem are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tem of the Board of Directors of County Sanitation District No. 11.
It was then moved: That Director Victor Leipzig be nominated as a candidate for the office of
Chair. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Leipzig as Chair.
It was further moved: That Director Shirley Dettloff be nominated as a candidate for the office of
Chair pro tem. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Dettloff as Chair pro tem.
DISTRICT 13 This being the annual meeting at which elections
Annual election of Chair and Chair pro tem are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tem of the Board of Directors of County Sanitation District No. 13.
It was then moved: That Director John M. Gullixson be nominated as a candidate for the office of
Chair. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Gullixson as Chair.
It was further moved: That Director Bob Zemel be nominated as a candidate for the office of Chair
pro tem. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Zemel as Chair pro tem.
�..
-5-
05/24/95
DISTRICT 14 This being the annual meeting at which elections
Annual election of Chair and Chair oro tern are to be held for Chair and Chair pro tem of each
of the Board of the Boards of Directors, the Secretary declared
nominations in order for the offices of Chair and
Chair pro tem of the Board of Directors of County Sanitation District No. 14.
It was then moved: That Director Thomas R. Saltarelli be nominated as a candidate for the office
of Chair. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Saltarelli as Chair.
It was further moved: That Director Mark A. Murphy be nominated as a candidate for the office of
Chair pro tem. There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Murphy as Chair pro tem.
ALL DISTRICTS The Joint Chair recognized Mr. Jerry Grubel, a
Recognition of persons who wish to be property owner in the City of Orange and within
heard on matters of general interest District No. 2. He requested a waiver of connection
fees for a parcel at the comer of Pixley and
Chapman Avenue because connection fees were apparently paid in 1914. The property was
condemned and demolished in 1989 by the City of Orange for a street-widening project.
Mr. Grubel is now in the process of rebuilding. However, the City will not issue the building permit
until a new connection fee has been paid.
General Counsel stated that he and the Director of Engineering were familiar with this issue and
had been working on getting it resolved. Calculations are needed based on the ordinance in
`✓ effect and the square footage of the new project. In addition, the actual date of demolition is
needed to determine if the applicant is late in his request for a waiving of fees which would violate
the ordinance in effect. The ordinance provides that if someone wishes to come in and obtain a
permit for a new facility, the application must be made within two years of the date of demolition of
the old unit.
Mr. Woodruff also stated that the Districts have had similar issues previously. Fees are set forth
in an ordinance and Districts' Staff and Directors do not have the authority to waive the ordinance.
The ordinance would have to be amended to do so. The Districts do not have a variance
procedure in their statutes and ordinances.
The Joint Chair then suggested that Mr. Grubel meet with the Director of Engineering after the
meeting to see if the issue could be resolved.
..
-6-
05/24/95
ALL DISTRICTS The Joint Chair advised the Directors that
Report of the Joint Chair orientation meetings and plant tours were
scheduled to be held on Saturday, June 3rd and
June 17th. He encouraged all Directors to attend. Mr. Cox also commented that tours to observe
off-shore testing facilities were being scheduled aboard the Districts' monitoring vessel,
Enchanter. Any Directors interested were advised to contact the General Manager.
Joint Chair Cox then announced the following tentatively scheduled upcoming meetings as
follows:
Planning, Design and Construction Committee-Thursday, June tsl, at 5:30 p.m.
Ad Hoc Committee re Space Utilization Study for Administrative Employees- Following
the July meeting of the Planning, Design and Construction Committee
Operations, Maintenance and Technical Services Committee-Wednesday, June 7th, at
5:30 p.m.
Finance, Administration and Human Resources Committee-Wednesday, June 14th, at
5:30 p.m.
Executive Committee- Wednesday, June 21st, at 5:30 p.m.
ALL DISTRICTS The General Manager commented on items that
Report of the General Manager should not have been on the agenda as the items
are less than $50.000 and need authorization only
from the Planning, Design and Construction Committee.
ALL DISTRICTS The General Counsel reported on the Association
Report of the General Counsel of Metropolitan Sewerage Agencies (AMSA)
conference he recently attended, along
with the General Manager and Assistant General Manager. He reported that the Clean Water Act
would probably not be approved this year.
DISTRICT 1 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held April 26, 1995.
the Chair ordered that said minutes be deemed
approved, as mailed.
DISTRICT 2 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held April 26. 1995,
the Chair ordered that said minutes be deemed
approved, as mailed.
�...�
-7-
1
05/24/95
DISTRICT 3 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held April 26, 1995,
the Chair ordered that said minutes be deemed
approved, as mailed.
DISTRICT 5 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held April 26, 1995.
the Chair ordered that said minutes be deemed
approved, as mailed.
DISTRICT 6 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held April 26, 1995,
the Chair ordered that said minutes be deemed
approved, as mailed.
DISTRICT 7 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held April 26, 1995,
the Chair ordered that said minutes be deemed
approved, as mailed.
DISTRICT 11 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held April 26, 1995,
the Chair ordered that said minutes be deemed
approved, as mailed.
DISTRICT 13 There being no corrections or amendments to the
_Approval of Minutes minutes of the regular meeting held March 8, 1995,
the special meetings held March 29, 1995 and
April 12, 1995, and the regular meeting held April 26, 1995, the Chair ordered that said minutes
be deemed approved, as mailed.
DISTRICT 14 There being no corrections or amendments to the
Approval of Minutes minutes of the regular meeting held March 8, 1995,
the special meetings held March 29, 1995 and
April 12, 1995, and the regular meeting held April 26, 1995, the Chair ordered that said minutes
be deemed approved, as mailed.
05/24/95
ALL DISTRICTS Moved, seconded and duly carried:
Ratification of Davment of Joint and
Individual District Claims That payment of Joint and individual District claims
set forth on exhibits "A", "B", "C", "D", "E" and "F"
attached hereto and made a part of these minutes, and summarized below, be, and are hereby,
ratified by the respective Boards in the amounts so indicated.
0346195 03/21/95 !w a M 0*19/95
DISTRICT NO,13 0.00 0.00 0.00 68.01
DISTRICT NO.14 - 227,694.01 2,575.00 347,572.25 5.828.77
DISTRICTS NOS.7&14 JOINT - 7,748.94 691.17 6�9.10 691.17
� 53.286.17 E354.231.35 E8.585.%
05/03/95 05/17/95
ALL DISTRICT
Joint Operating Fund - $804,262.45 $449,899.42
Capital Outlay Revolving Fund - 405,563.40 471,447.11
Joint Working Capital Fund - 210,240.65 464,347.47
Self-Funded Insurance Funds - 78,626.43 4,042.26
DISTRICT NO. 1 - 7,065.63 0.00
DISTRICT NO, 2 - 25,478.88 69,850.90
DISTRICT NO, 3 - 55,381.28 167,012.17
DISTRICT NO. 5 - 6,706.64 6,429.09
DISTRICT NO. 6 - 4,672.86 0.00
DISTRICT NO. 7 - 7,420.18 17,345.53
DISTRICT NO. 11 - 42,016.27 5,164.82
DISTRICT NO. 13 - 101.37 0.00
DISTRICT NO. 14 - 119,681.33 2,180.00
DISTRICTS NOS. 3 & 11 JOINT - 2,500.00 0.00
DISTRICTS NOS. 5 & 6 JOINT - 0.00 2,637.94
DISTRICTS NOS. 6 & 7 JOINT - 210.71 3,161.28
DISTRICTS NOS. 7 & 14 JOINT - 19.79 6,221.73
31.769.947.87 51.669.739.72
-9-
05/24/95
ALL DISTRICTS Moved, seconded and duly carried:
�.,.� Authorizina staff to issue a purchase order
to Pioneer-Standard Electronics, Inc.. That staff be, and is hereby, authorized to issue a
for the Purchase of Eight Celebris 590 purchase order to Pioneer-Standard Electronics,
Desktop Computers. Specification Inc., in a total amount of$36,342.72, plus sales tax,
No. E-255 for the Purchase of Eight Celebris 590 Desktop
Computers, Specification No. E-255, in
accordance with the terms and conditions of the California Multiple Awards Schedule Program of the
State of California and State of California Contract No. 3-94-70-0037A.
Director Mark A. Murphy requested that his abstention from voting on this item be made a matter of
record.
ALL DISTRICTS Moved, seconded and duty carried:
Receive, file and approve staff Summary
Financial Report for nine-month period That the staff Summary Financial Report for the
ending March 31, 1995 nine-month period ending March 31, 1995, be, and
is hereby, received, ordered filed and approved.
ALL DISTRICTS Moved, seconded and duly carried:
Receive and file draft minutes of the
Steering Committee That the draft minutes of the Steering Committee
meeting held on April 26, 1995, be, and are hereby,
received and ordered filed.
ALL DISTRICTS Moved, seconded and duly carried:
Receive and file draft minutes of the Ad Hoc
Committee re Space Utilization Study for That the draft minutes of the Ad Hoc Committee re
Administrative Employees Space Utilization Study for Administrative
Employees meeting held on April 26, 1995, be, and
are hereby, received and ordered filed.
ALL DISTRICTS Moved, seconded and duly carried:
Receive and file draft minutes of the
Operations. Maintenance and Technical That the draft minutes of the Operations,
Services Committee Maintenance and Technical Services Committee
meeting held on May 3, 1995, be, and are hereby,
received and ordered filed.
"" -10-
05/24/95
ALL DISTRICTS Moved, seconded and duly carried:
Receive and file draft minutes of the
Planning. Design and Construction That the draft minutes of the Planning, Design and
Committee Construction Committee meeting held on May 4,
1995, be, and are hereby, received and ordered
filed.
ALL DISTRICTS Moved, seconded and duly carried:
Receive and file draft minutes of the
Finance. Administrative and Human That the draft minutes of the Finance,
Resources Committee Administrative and Human Resources Committee
meeting held on May 10, 1995, be, and are hereby,
received and ordered filed.
ALL DISTRICTS Moved, seconded and duly carried:
Receive and (le draft minutes of the
Executive Committee That the draft minutes of the Executive Committee
meeting held on May 17, 1995, be, and are hereby,
received and ordered filed.
ALL DISTRICTS (OMTS95-023) Moved, seconded and duly carried:
Authorizing a 1995 Summer Work Program
That a 1995 Summer Work Program for painting
and grounds maintenance and other miscellaneous work, be, and is hereby, authorized.
ALL DISTRICTS (OMTS95-024)
Awarding Marine Monitoring Vessel for Moved, seconded and duly carried:
Surveying Coastal Waters,
Specification No. P-158. to Enchanter. Inc. That the Boards of Directors hereby adopt
Resolution No. 95-49, awarding contract for Marine
Monitoring Vessel for Surveying Coastal Waters, Specification No. P-158, to Enchanter, Inc. for the
period July 1, 1995 to June 30, 1996, for an annual amount not to exceed $100,800.00, with
provisions for two one-year extensions. Said resolution, by reference hereto, is hereby made a part
of these minutes.
-1 1-
05/24/95
ALL DISTRICTS (OMTS95-025)
Actions re Santa Monica Bay
Restoration Proiect (SMBRP)
epidemiological survey
Authorizing the Districts' participation Moved, seconded and duly carried:
in the Santa Monica Bay Restoration
Proiect (SMBRP) epidemiological That the Districts' participation in the Santa Monica
survey Bay Restoration Project (SMBRP) epidemiological
survey, be, and is hereby, authorized.
Authorizing the General Manager Moved, seconded and duly carried:
to enter into a Memorandum of
Understanding (MOU)with SMBRP That the General Manager be, and is hereby,
and to enter into a contract with the authorized to enter into a Memorandum of
State Water Resources Control Board Understanding (MOU)with SMBRP; and,
(SWRCB)
FURTHER MOVED: That the General Manager,
be, and is hereby, authorized to enter into a contract with the State Water Resources
Control Board (SWRCB) to implement said MOU and to reimburse the Districts for an
amount not to exceed $180,000.00 for costs associated with labor and materials to analyze
virus samples and continue in-house efforts during this project period through a Specific
Term Employment Agreement, in form approved by General Counsel.
Authorizing the General Manager Moved, seconded and duly carried:
to enter into a six-month Soecifc
Tenn Employment Agreement for a That the General Manager be, and is hereby,
Laboratory Analyst authorized to enter into a six-month Specific Term
Employment Agreement for a Laboratory Analyst,
at a rate not to exceed $25.00 per hour, for a total amount not to exceed $26,000.00.
Authorizing the General Manager Moved, seconded and duly carried:
to enter into additional contracts, as
necessary, to implement the terms of That the General Manager be, and is hereby,
the MOU authorized to enter into additional contracts, as
necessary, with no increase in the authorized
amount of$180,000.00 to implement the terns of the MOU.
-12-
05/24/95
ALL DISTRICTS (PDC95-16)
Actions re Warehouse Building at Plant
No. 2. Job No. P2-35-2: Maintenance
Building at Plant No. 2. Job No. P2-35-3:
Process Area Fire Protection. Signage and
Water Distribution System Modifications at
Plant No. 2 Job No. P2-46: and Office
Trailer Relocations at Plant Nos. 1 and 2.
Specification Nos. M-044 (Rebid) and
M-044-1
Separating Specification No M-044 Moved, seconded and duly carried:
(Rebid)from balance of the project
That Office Trailer Relocations at Plants Nos. 1
and 2, Specification No. M-044 (Rebid), is hereby authorized to be separated from the
balance of the project for Warehouse Building at Plant No. 2, Job No. P2-35.2;
Maintenance Building at Plant No. 2, Job No. P2-35-3; and Process Area Fire Protection,
Signage and Water Distribution System Modifications at Plant No. 2, Job No. P2-46.
Approving plans and specifications Moved, seconded and duly carried:
re Specification No. M-044 (Rebid)
That the Boards of Directors hereby adopt
Resolution No. 95-50, approving plans and specifications for Office Trailer Relocations at
Plant Nos. 1 and 2, Specification No. M-044 (Rebid), and authorizing the General Manager v
to establish the date for receipt of bids. Said resolution, by reference hereto, is hereby
made a part of these minutes.
ALL DISTRICTS (PDC95-17) Moved, seconded and duly carried:
Approving Change Order No. 6 to the plans
and specifications for Job No. P1-38-2 That Change Order No. 6 to the plans and
specifications for Priority Projects Element of
Miscellaneous Improvements to Facilities at Plant No. 1, Job No. P1-38-2, authorizing a net addition
of$34,878.00 to the contract with Pascal & Ludwig Engineers for five items of additional work, be,
and is hereby, approved.
ALL DISTRICTS (PDC95-18) Moved, seconded and duly carried:
Approving Change Order No. 7 to the plans
and specifications for Job No. P2-42-2 That Change Order No. 7 to the plans and
specifications for Secondary Treatment Expansion
at Plant No. 2, Job No. P2-42-2, authorizing an addition of$31,673.00 to the contract with Margate
Construction, Inc. for two items of additional work, be, and is hereby, approved.
-13-
05/24/95
ALL DISTRICTS (PDC95-19) Moved, seconded and duly carried:
Approving Chance Order No. 5 to the plans
and specifications for Job Nos P1-36-1 That Change Order No. 5 to the plans and
P1-38-1: P1-38-4: and P2-43-3 specifications for Electrification of Pump Drives at
Treatment Plant No. 1, Job No. P1-36-1; Security
and Landscaping Element of Miscellaneous Improvements to Facilities at Plant No. 1, Job
No. P1-38-1; Miscellaneous Improvements to Facilities at Plant No. 1, Job No. P7-38-4; and
Miscellaneous Improvements to Facilities at Treatment Plant No. 2, Job No. P2-43-3, authorizing a
net addition of$40,069.00 to the contract with Advanco Constructors, Inc., Division of gum
Constructors, Inc., for 13 items of additional or deleted work, be, and is hereby, approved.
ALL DISTRICTS (PDC95-14) Moved, seconded and duly carried:
Approvino Addendum No. 2 to the
Professional Services Agreement with Lee That the Planning, Design and Construction
& Ro Consulting Engineers. Inc. re Job Committee certification of the final negotiated fee
Nos. P1-38-5 and P2-46 relative to Addendum No. 2 to the Professional
Services Agreement with Lee& Ro Consulting
Engineers, Inc. for preparation of a project report, preliminary design, plans and specifications and
providing construction support services relative to Process Area Fire Protection Signage and Water
Distribution System Modifications at Plant No. 1, Job No. P1-38-5, and Process Area Fire Protection,
Signage and Water Distribution System Modifications at Plant No. 2, Job No. P2-46, providing for
additional design services and construction support services, be, and is hereby, received, ordered
filed and approved; and,
FURTHER MOVED: That the Boards of Directors hereby adopt Resolution No. 95-51, approving
Addendum No. 2 to said agreement with Lee & Ro Consulting Engineers, Inc. for said additional
services, on an hourly-rate basis for labor plus overhead, plus direct expenses, subconsultant fees
and fixed profit, for an additional amount not to exceed$186,670.00, increasing the total authorized
compensation from an amount not to exceed $523,640.00 to an amount not to exceed $710,310.00.
Said resolution, by reference hereto, is hereby made a part of these minutes.
ALL DISTRICTS (PDC95-20) Moved, seconded and duly carried:
Approvinc Addendum No. 4 to the
Professional Services Agreement with John That the Planning, Design and Construction
Carollo Engineers re Job Nos. P1-36 and Committee certification of the final negotiated fee
P2-42 relative to Addendum No. 4 to the Professional
Services Agreement with John Carollo Engineers
for design and construction services, preparation of operations and maintenance manuals, and
training services re Secondary Treatment Improvements at Plant No. 1, Job No. P1-36, and
Secondary Treatment Expansion at Plant No. 2, Job No. P2-42, providing for additional construction
support and programming of process control equipment and computers, be, and is hereby, received,
ordered filed and approved; and,
FURTHER MOVED: That the Boards of Directors hereby adopt Resolution No. 95-52, approving
Addendum No. 4 to said agreement with John Carollo Engineers for said additional services, on an
houdy-rate basis for labor plus overhead, plus direct expenses and fixed profit, for an additional
amount not to exceed $750,215.00, increasing the total authorized compensation from an amount
not to exceed $5,889,150.00 to an amount not to exceed $6,639,365.00.
..J -14-
05/24/95
ALL DISTRICTS (FPC95-16) Moved, seconded and duly carried:
Approving Final Draft Investment Policy
Statement prepared by Chandler Liquid That the Final Draft Investment Policy Statement
Asset Management. Inc. and Callan prepared by Chandler Liquid Asset Management,
Associates Inc. and Callan Associates, Districts' investment
advisors, be, and is hereby, approved.
ALL DISTRICTS (FAHR95-24) Moved, seconded and duly carried:
Extending Early Retirement Incentive
Program Provisions for all eligible Districts' That the Boards of Directors hereby adopt
employees Resolution No. 95-53, extending Early Retirement
Incentive Program Provisions for all eligible
Districts' employees. Said resolution, by reference hereto, is hereby made a part of these minutes.
ALL DISTRICTS (FAHR95.25) Moved, seconded and duly carried:
Adoptina Resolution Providing for
Classification. Compensation and other That the Boards of Directors hereby adopt
Terms. Conditions. Rules and Regulations Resolution No. 95-54, Providing for Classification,
of Employment of Districts' Employees, and Compensation and Other Terms, Conditions, Rules
Repealino Resolution Nos. 79-20 and 79-21 and Regulations of Employment of Districts'
Employees, and Repealing Resolution Nos. 79-20
and 79-21, as amended. Said resolution, by reference hereto, is hereby made a part of these
minutes.
ALL DISTRICTS General Counsel reported that his office had
Status Report re Countv's Commingled received invoices for services through March 1995
Investment Pool from the Districts' bankruptcy counsel, Bronson,
Bronson and McKinnon. The gross charges were
$238,704.00. From that sum, General Counsel has deducted $17,557.00, most of which should
have been charged to the Investment Pool Committee and not the Districts. The total charges from
General Counsers office were$74,153.00.
General Counsel also reported that he sent a letter to Bronson, Bronson and McKinnon dated
May 17. 1995, advising them that their services would only be needed on a specific requested issue
basis.
ALL DISTRICTS Moved, seconded and duly carried:
Changing the Regular Joint Board meeting
date due to the Thanksgiving holiday That the change in the Regular Joint Board
meeting date from Wednesday, November 22,
1995 to Wednesday, November 15, 1995 at 7:30 p.m. due to the Thanksgiving Holiday, be, and is
hereby, approved.
ALL DISTRICTS Moved, seconded and duly carried:
Changing the Regular Joint Board meetino
date due to the Christmas holiday That the change in the Regular Joint Board
meeting date from Wednesday, December 27,
1995 to Wednesday, December 13, 1995 at 7:30 p.m. due to the Christmas Holiday, be, and is
hereby, approved.
15
05/24/95
DISTRICT 1 Moved, seconded and duly carried:
Second reading of proposed Ordinance
No. 125 That proposed Ordinance No. 125,An Ordinance of
the Board of Directors of County Sanitation District
No. 1 of Orange County, California, Establishing Excess Capacity Charge Program, be read by title
only; and,
FURTHER MOVED: That the second reading of said ordinance in its entirety be, and is hereby,
waived,whereupon the Secretary read Ordinance No, 125 by title only.
DISTRICT 1 Moved, seconded and duly carried by the following
Adopting Ordinance No. 125 roll call vote:
AYES: Pat McGuigan, Chair, James M. Ferryman, Mark A. Murphy, Thomas R.
Saltarelli
NOES: None
ABSTENTIONS: None
ABSENT: Roger R. Stanton
That Ordinance No. 125, An Ordinance of the Board of Directors of County Sanitation District No. 1
of Orange County, California, Establishing Excess Capacity Charge Program, be, and is hereby,
adopted.
DISTRICT 2 Moved, seconded and duly carried:
Second reading of proposed Ordinance
No. 219 That proposed Ordinance No. 219, An Ordinance of
the Board of Directors of County Sanitation District
No. 2 of Orange County, California, Establishing Excess Capacity Charge Program, be read by title
only; and,
FURTHER MOVED: That the second reading of said ordinance in its entirety be, and is hereby,
waived, whereupon the Secretary read Ordinance No. 219 by title only.
V -16-
05/24/95
DISTRICT 2 Moved, seconded and duly carried by the following
Adootina Ordinance No. 219 roll call vole:
AYES: John Collins, Chair, Steve Anderson, Barry Denes, Norman Z. Eckenrode,
Pat McGuigan, Mark A. Murphy, Julie Sa, Sheldon S. Singer, Daniel T.
Welch, Bob Zemel
NOES: None
ABSTENTIONS: None
ABSENT: Burnie Dunlap, Roger R. Stanton
That Ordinance No. 219, An Ordinance of the Board of Directors of County Sanitation District No. 2
of Orange County, California, Establishing Excess Capacity Charge Program, be, and is hereby,
adopted.
DISTRICT 3 Moved, seconded and duly carried:
Second reading of proposed Ordinance
No. 322 That proposed Ordinance No. 322, An Ordinance of
the Board of Directors of County Sanitation District
No. 3 of Orange County, California, Establishing Excess Capacity Charge Program, be read by tNe
only; and,
FURTHER MOVED: That the second reading of said ordinance in its entirety be, and is hereby,
waived, whereupon the Secretary read Ordinance No. 322 by title only. �...�
DISTRICT 3 Moved, seconded and duly carried by the following
Adootina Ordinance No. 322 roll call vote:
AYES: Sal A. Sapien, Chair, Steve Anderson, George Brown, John Collins, Don R.
Griffin, Victor Leipzig, Wally Linn, Pat McGuigan, Margie L. Rice, Julie Be,
Sheldon S. Singer, Charles E. Sylvia, Bob Zemel
NOES: None
ABSTENTIONS: None
ABSENT: Cecilia L. Age, Burnie Dunlap, Roger R. Stanton
That Ordinance No. 322, An Ordinance of the Board of Directors of County Sanitation District No. 3
of Orange County, California, Establishing Excess Capacity Charge Program, be, and is hereby,
adopted.
-17-
e
05/24/95
DISTRICT 5 Moved, seconded and duly carried:
Second reading of proposed Ordinance
No. 531 That proposed Ordinance No. 531, An Ordinance of
the Board of Directors of County Sanitation District
No. 5 of Orange County, California, Establishing Excess Capacity Charge Program, be read by title
only; and,
FURTHER MOVED: That the second reading of said ordinance in its entirety be, and is hereby,
waived, whereupon the Secretary read Ordinance No. 531 by title only.
DISTRICT 5 Moved, seconded and duly carried by the following
Adopting Ordinance No. 531 roll call vote:
AYES: Jan Debay, Chair, John C. Cox, Jr.
NOES: None
ABSTENTIONS: None
ABSENT: William G. Steiner
That Ordinance No. 531, An Ordinance of the Board of Directors of County Sanitation District No. 5
of Orange County, California, Establishing Excess Capacity Charge Program, be, and is hereby,
adopted.
DISTRICT 6 Moved, seconded and duly carried:
Second reading of Proposed Ordinance
No. 625 That proposed Ordinance No. 625, An Ordinance of
the Board of Directors of County Sanitation District
No. 6 of Orange County, California, Establishing Excess Capacity Charge Program, be read by title
only; and,
FURTHER MOVED: That the second reading of said ordinance in its entirety be, and is hereby,
waived, whereupon the Secretary read Ordinance No. 625 by title only.
DISTRICT 6 Moved, seconded and duly carried by the following
Adopting Ordinance No. 625 roll call vote:
AYES: James M. Ferryman, Chair,Jan Debay
NOES: None
ABSTENTIONS: None
ABSENT: William G. Steiner
That Ordinance No. 625, An Ordinance of the Board of Directors of County Sanitation District No. 6
of Orange County, California, Establishing Excess Capacity Charge Program, be, and is hereby,
adopted.
`"' -18-
05/24/95
DISTRICT 7 Moved, seconded and duly carried:
Second reading of proposed Ordinance
No. 732 That proposed Ordinance No. 732, An Ordinance
of the Board of Directors of County Sanitation
District No. 7 of Orange County, California, Establishing Excess Capacity Charge Program, be read
by title only; and,
FURTHER MOVED: That the second reading of said ordinance in its entirety be, and is hereby,
waived, whereupon the Secretary read Ordinance No. 732 by title only.
DISTRICT 7 Moved, seconded and duly carried by the
Adopting Ordinance No. 732 following roll call vote:
AYES: Barry Hammond, Chair, Jan Debay, James M. Ferryman, Pat McGuigan,
Mark A. Murphy, Thomas R. Saltarelli
NOES: None
ABSTENTIONS: None
ABSENT: William G. Steiner
That Ordinance No. 732, An Ordinance of the Board of Directors of County Sanitation District No. 7
of Orange County, California, Establishing Excess Capacity Charge Program, be, and is hereby,
adopted.
DISTRICT 11 Moved, seconded and duly carried:
Second reading of proposed Ordinance
No. 1121 That proposed Ordinance No. 1121, An
Ordinance of the Board of Directors of County
Sanitation District No. 11 of Orange County, California, Establishing Excess Capacity Charge
Program, be read by title only; and,
FURTHER MOVED: That the second reading of said ordinance in its entirety be, and is hereby,
waived, whereupon the Secretary read Ordinance No. 1121 by title only.
-19-
05/24/95
`.� DISTRICT 11 Moved, seconded and duly carried by the
Adoptina Ordinance No. 1121 following roll call vote:
AYES: Victor Leipzig, Chair, Shirley Dettloff
NOES: None
ABSTENTIONS: None
ABSENT: Roger R. Stanton
That Ordinance No. 1121, An Ordinance of the Board of Directors of County Sanitation District
No. 11 of Orange County, California, Establishing Excess Capacity Charge Program, be, and is
hereby, adopted.
DISTRICTS 13 & 14
Actions re first reading and public hearing of
Proposed ordinances Establishina Excess
Capacity Charge Program
Public hearina The Joint Chair announced that this was the time
and place fixed by the Boards of Directors of
County Sanitation Districts Nos. 13 and 14 for the public hearing on the following proposed
Ordinances Establishing Excess Capacity Charge Program:
District Ordinance No.
13 1315
14 1407
Open Public Hearing The Chair declared the hearing open at 8:04 p.m.
Verbal report of General Counsel General Counsel reported that the public hearing
was continued to this date for Districts Nos. 13
and 14 due to a lack of a quorum at last month's meeting. The excess capacity charges are
identical and structured the same as in the other Districts.
Close hearing There being no public comments, the Chair
declared the hearing closed at 8:05 p.m.
"' -20-
05/24/95
DISTRICT 13
Actions re first readina and introduction of
Ordinance No. 1315
First reading of Proposed Ordinance Moved, seconded and duly carried by unanimous
No. 1315 vole:
That proposed Ordinance No. 1315, An Ordinance of the Board of Directors of County
Sanitation District No. 13 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 1315 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 1315, An Ordinance of the Board of Directors of County Sanitation
District No. 13 of Orange County, California, Establishing Excess Capacity Charge
Program, be introduced and passed to second reading and adoption on June 28, 1995.
DISTRICT 14
Actions re first reading and introduction of
proposed Ordinance No. 1407
First reading of proposed Moved, seconded and duly carried by unanimous
Ordinance No. 1407 vote:
That proposed Ordinance No. 1407, An Ordinance of the Board of Directors of County
Sanitation District No. 14 of Orange County, California, Establishing Excess Capacity
Charge Program, be read by title only and that reading of said ordinance in its entirety be
waived.
Following the reading of Ordinance No. 1407 by title only, it was moved, seconded and duly
carried:
That Ordinance No. 1407, An Ordinance of the Board of Directors of County Sanitation
District No. 14 of Orange County, California, Establishing Excess Capacity Charge
Program, be introduced and passed to second reading and adoption on June 28, 1995.
Director Roger R. Stanton arrived at 8:07 p.m.
ALL DISTRICTS General Counsel reported to the Directors the
General Counsel's Comments Prior to Closed need for a closed session as authorized by
Session Government Code Sections 54956.9 and
54957.6 to discuss and consider the items that
are specified as Items 19(b)(3) and (5) on the published Agenda. No other items would be
discussed or acted upon.
_Y1_
05/24/95
ALL DISTRICTS Moved, seconded and duly carried:
�.J Convene in closed session Pursuant to
Government Code Sections 54956.9 and The Boards convened in closed session at
54957.6 8:06 p.m. pursuant to Government Code
Sections 54956.9 and 54957.6. Confidante
Minutes of the Closed Session held by the Board(s) of Directors have been prepared in accordance
with California Government Code Section 54957.2 and are maintained by the Board Secretary in the
Official Book of Confidential Minutes of Board and Committee Closed Meetings. No actions were
taken re Agenda Items 19(b)(3) and (5).
ALL DISTRICTS At 8:14 p.m., the Boards reconvened in regular
Reconvene in reoular session session.
DISTRICT 1 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 1 be adjourned. The Chair then declared the meeting so adjourned at
8:15 P.M.
DISTRICT 2 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 2 be adjourned. The Chair then declared the meeting so adjoumed at
8:15 P.M.
DISTRICT 3
Actions re Replacement of Westminster Avenue
Force Main (First Unit) and New Westside Pump
Station Force Main, Contract No. 3-36R
Approving Addendum No. 1 to the Moved, seconded and duly carried:
plans and specifications
That Addendum No. 1 to the plans and
specifications for Replacement of Westminster Avenue Force Main (First Unit) and New
Westside Pump Station Force Main, Contract No. 3-36R, making miscellaneous technical
clarifications, be, and is hereby, approved.
Approving Addendum No. 2 to the Moved, seconded and duly carried:
Plans and specifications
That Addendum No. 2 to the plans and
specifications for Replacement of Westminster Avenue Force Main (First Unit) and New
Westside Pump Station Force Main, Contract No. 3-36R, changing the date for receipt of
bids from April 11, 1995 to April 25, 1995, and making miscellaneous technical
clarifications, be, and is hereby, approved.
d. -22-
05/24/95
Awardina Contract No. 3-36R to Albert W. Moved, seconded and duly carried:
Davies Inc.
That the Board of Directors hereby adopts Resolution No. 95-55-3, receiving and filing bid
tabulation and recommendation and awarding contract for Replacement of Westminster
Avenue Force Main (First Unit) and New Westside Pump Station Force Main, Contract
No. 3-36R, to Albert W. Davies, Inc. in the total amount of$3,760,000.00. Said resolution,
by reference hereto, is hereby made a part of these minutes.
DISTRICT 3 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 3 be adjourned. The Chair then declared the meeting so adjourned at
8:15 p.m.
DISTRICT 5 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 5 be adjourned. The Chair then declared the meeting so adjourned at
8:15 p.m.
DISTRICT 6 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 6 be adjourned. The Chair then declared the meeting so adjourned at
8:15 P.M.
DISTRICT 7 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 7 be adjourned. The Chair then declared the meeting so adjourned at
8:15 p.m.
DISTRICT 11 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 11 be adjourned. The Chair then declared the meeting so adjourned
at 8:15 p.m.
DISTRICT 13 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 13 be adjourned. The Chair then declared the meeting so adjourned
at 8:15 p.m.
V
-23-
05/24/95
DISTRICT 14 Moved, seconded and duly cabled:
Approving Change Order No. 1 to the Plans and
specifications for Contract No. 14-1-1A That Change Order No. 1 to the plans and
specifications for Baker-Gisler Interceptor, from
Fairview Road to Plant No. 1, Contract No. 14-1-1A, for an addition of$33,676.16 to the contract
with Mladen Buntich Construction Co., Inc., for twelve Hems of additional work, and granting a time
extension of two calendar days for completion of said additional work, be, and is hereby, approved.
DISTRICT 14 Moved, seconded and duly carried:
Adioumment
That this meeting of the Board of Directors of
County Sanitation District No. 14 be adjourned. The Chair then declared the meeting so adjourned
at 8:15 p.m.
Secretary of th oarKtf Directors
of County Be tion Wricts
Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14
`o -24-
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE 0=7195 PAGES
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY REPORT NUMBER AP43
CLAIMS PAID 03tO8/95 POSTING DATE 03/08/95
m SUMMARY AMOUNT
x
S 01 OPER FUND 55,096.85
02 OPER FUND
�+ 02 CAP FAC FUND 359.0844.39
03 OPER FUND 63,800.74
> 03 CAP FAC FUND 60,974.76
050PER FUND 10,599.16
OB OPER FUND 271,79
N7 OVER FUND 4,922.22
N7 CAP FAG FUND 280.00
011 OPER FUND 13.687.30
011 CAP FAC FUND
01/OPER FUND 2.203.01
014 CAP FAC FUND 225491 M
0566 OPER FUND 3,339.60
0687 PER FUND $2271694.01
07S74 OPER FUND 7.749.9a 7,748.94
JT OPER FUND 1.045.932.70 ILL 42.95
CORF 245.660.50
SELF-FUNDED INSURANCE FUND 15,187.62
JT DIST WORKING CAPITAL 243.761.50
$2,624,935.88
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 03/19195 PAGE
REPORT NUMBER API3
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CIAIMSPAIO0322J95 POSTING DATE 0312M5
SUMMARY AMOUNT
02 OVER FUND 3200.00
m E2 CAP FAC FUND 19.774.43
x 03 OPER FUND 31.693.67
m 93 CAP FAC FUND 8.525.90
95 OPER FUND 9.05.46
95 CAP FAC FUND 535.00
'-1 97 OPER FUND 1.707.35
p� 07 CAP FAC FUND 23,100.11
911 OPER FUND 907.35
014 CAP FAC FUND 2,575.00 $2�575.00
9596 CAP FAC FUND --- - -- --- 20.007.W 691.17
9837 OPER FUND 453.80
117A14 OPIERF SWAT
JT OPER FUND 544,000.97 JL266.17
CORF 494,079.43
SELF-FUNDED INSURANCE FUND 30,72318
JT DIST WORKING CAPITAL 435,300.29
$1.613.346.19
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 3rMS PAGE 5
REPORTNUMBERAP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAdMS PAID 0 M&1)5 POSTING DATE 04/05/95
WARRANT NO. VENDOR AMOUNT
144087 UNITED PARCEL SERVICE $280.93 PARCEL SERVICES
144088 UNITED SCIENTIFIC PRODUCTS $127,32 IAS SUPPLIES
144089 DATAVAULTSIUS SAFE DEPOSIT CO. $1,498,00 SAFE DEPOSIT BOX RENTAL
144090 VWR SCIENTIFIC S1,35BA4 LAB SUPPLIES
144091 VALLEY CRIES SUPPLY CO. $405,13 PLUMBING SUPPLIES
I44092 VARIAN ASSOCIATES,INC. $10.79647 LAB EQUIPMENT
144093 VERTEX SYSTEMS $3,155.01 COMPUTER DATA SUPPORT
m 1440M CARL WARREN 8 CO. S4W 99 INSURANCE CLAIMS ADMINISTRATOR
2 144095 WAXIE S2.164.08 JANITORIAL SUPPLIES
144M WESTERN STATES CHEMICAL SUPPLY $37,015.28 CAUSTIC SODA&HYPOCHLORIDE M.0.8-124284-13.84
144(97 WEST-LIIE SUPPLY CO. $673.96 ELECTRIC SUPPLIES
y 144098 WESTRUX INTERNATIONAL S71,662.37 TRUCK PARTS
144099 WEST TECH $15.640.82 OFFICE EQUIPMENT
144100 ROURKE.WOODRUFF 8 SPRADLIN $47,752.52 LEGAL SERVICES M.0.2-19-92
144101 WOODWARD GOVERNOR CO. $3.13800 MECHANICAL REPAIRS
144102 XEROX CORP. $11.33388 COPIER LEASES
2,111,568.57
SUMMARY AMOUNT
01 OPER FUND $1.632 89
02 OPER FUND 5,324.87
92 CAP FAC FUND 60,646.25
03 OPER FUND 29,9S4 95
03 CAP FAC FUND 10,545.34
05 OPER FUND 4.197.37
05 CAP FAC FUND $7,194.02
08 OPER FUND 48.00
07 OPER FUND 21.38811
87 CAP FAC FUND 9,370.83
011 OPER FUND 9,954.32
_ 011 CAP FAC FUND _ 114 409.41.
�$14 OPER FUND 6"00 $347,572.25
014 CAP FAC FUND 346204.25 ICAP FAC FUND 346204.25 I 6,659.10
0586 OPER FUND 2.535.10
0687 OPER FUND 3,134.87 $354,231.35
07814OPER FUND---- ---� 0,6S)10
JT OPER FUND 7 5,
CORF 477.190.45
SELF-FUNDED INSURANCE FUND 43.698.02
JT DIST WORKING CAPITAL 162,008,45
2,111,508.57
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 04714195 PAGE
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COINM
CLAIMS PAID 04/19/95 POSTING DATE 04119/95
SUMMARY AMOUNT
01 OPER FUND $335.89
02 OPER FUND 1,567.98
02 CAP FAC FUND 28.724.87
S 030PER FUND 14.659.33
H p3 CAP FAC FUND 149,052.93
t» 050PER FUND 4,588.98
H 05 CAP FAC FUND 2046
06 OPER FUND 238.02
o #7 OPER FUND 19.542.64
07 CAP FAC FUND 32./8
011 OPER FUND 4.159.91
p11 CAP FAC FUND 24.74
0130PER FUND 88.0 $ 68.01
0/4 CAP FAC FUND 5,826.7; 5,826.77
07814 OPER FUND 691.17 691.17
�T OPER F 453,598.60
CORF 831.772.08 $6 585.95
SELF-FUNDED INSURANCE FUND 9.916.20
JT DIST WORKING CAPITAL 305,703.66
1,1131.524.42
-
FUND NO 919D - JT DIST WORKING CAPITAL PROCESSING DATE 5/195 PAGE 1
REPORTNUMBERAP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05103MS POSTING DATE 059395
WARRANT NO. VENDOR AMOUNT DESCRIPTION
1WN AG TECH COMPANY $2X.609A8 RESIDUALS REMOVAL M.O.10.9-91
14 11)5 ABU $174.46 LAB SUPPLIES
14MM ATM M.INC. $20D.00 LAB SERVICES
144407 ATB T-UNIPLAN SERVICE $2.411.11 LONG DISTANCE TELEPHONE SERVICES
144408 ATAT-MEGACOM SERVICE $188.42 LONG DISTANCE TELEPHONE SERVICES
144409 ACCURATE MEASUREMENT SYS. $24,961.26 COMMUNICATION SUPPLIES
144410 ACOPIAN CORP. S942.50 INSTRUMENT PARTS
144411 ADVANCED COOLING TECHNOLOGIES $113.44 ELECTRIC PARTS
14 12 AOVANCO CONSTRUCTORS.INC. 893,025.00 CONSTRUCTIONP141-1
1Q413 AEROCHEM,INC. $3.358.64 REFUND USER FEE OVERPAYMENT
X 1"414 AIR PRODUCTS 6 CHEMICALS $18.03720 O&M AGREEMENT OXY GEN.SYST.M.O.8.9-09
x 144415 ALLIED SUPPLY CO. 61,206.43 VALVE PARTS
144416 AMERIDATA 51,004.23 OFFICE EQUIPMENT
144417 AMERICAN WATER WORKS 551.00 MEMBERSHIP DUES
H 14 18 AMICON,INC. $750.90 LAB SUPPLIES
144419 ANIXTER-DISTRIBUTION $217.75 OFFICE EQUIPMENT
IN
144420 ANTHONY PEST CONTROL $195.00 SERVICE AGREEMENT
144421 APPLIED BIOSYSTEMS,INC. $2.619.99 LAB SUPPLIES
1N422 ARROPAIEADELECTRIC CORP. $59.53 ELECTRIC SUPPLIES
1N 23 ARTS DISPOSAL SERVICE,INC. 6891A0 WASTE REMOVAL
144424 ASBURY ENVIRONMENTAL SERV. S65.OD WASTE OIL REMOVAL
IW25 ASSOCIATED VACUUM TECH,INC. S252.35 COMPRESSOR PARTS
144426 ATKINIJONES COMPUTER SERVICE $321.30 SERVICE AGREEMENT
144427 AVNET COMPUTER $162.027.99 COMPUTER EQUIPMENT M.O3-0.95
1 4 25 AWARDS 5 TROPHIES $310.85 PLAGUES
14 29 BFI MEDICAL WASTE SYSTEMS $4.00 LAB SERVICES
144430 BKK LANDFILL S2A11.63 RESIDUALS REMOVALMO.IOMI
144431 BRW SAFETY B SUPPLY S148A3 SAFETY SUPPLIES
14 32 BATTERY SPECIALTIES $662.81 BATTERIES
IW33 BAUER COMPRESSOR $137.39 COMPRESSOR PARTS
144434 BAXTER DIAGNOSTICS,INC. $1,500.57 LAB SUPPLIES
144435 BECKMAN INSTRUMENTS $388.76 UB SUPPLIES
144436 JB H BERGE.INC. $259A5 LAB SUPPLIES
14 37 BETATECHNOLOGIES 5152.29 INSTRUMENT PARTS
144438 SOLSA RADIATOR SERVICE $527.97 TRUCK REPAIRS
1N 39 BON- RUES $97.33 TRUCK PARTS
1p 10 BRONSON.BRONSON B MCKINNON $97130 LEGAL SERVICES-COUNTY BANKRUPTCY M.O.124494
144441 BUDGETJANITORIAL $3.330.00 JANITORIAL SERVICES
14N12 BURKE ENGINEERING CO. 5854.84 ELECTRIC SUPPLIES
1NN3 BUSH S ASSOCIATES,INC. $1,062.00 SURVEYING SERVICES M.O.88-94
144444 CADIRECTION 5289.38 OFFICE EOUIPMENT
14 15 CALMOL.INC. $75457 INSTRUMENTPARTS
14416 CALFON CONSTRUCTION $85.00 PUN B SPEC.REFUND
14 17 CALIF ASSOC.OF SAN.AGENCIES SB,DOD50 MEMBERSHIP DUES W0.1-11-95
1H 40 CALIFORNNAUTOMATICGATE $115.00 SERVICEAGREEMENT
14 19 CANUS CORPORATION $51.20D.65 FIBER OPTIC CABLE
FUND NO 91H - JT DIST WORKING CAPITAL PROCESSING DATE 511195 PAGE
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID O5MM5 POSTING DATE 05003815
WARRANT NO. VENDOR AMOUNT
144450 JOHN CARDILLO ENGINEERS $13,094.28 ENGINEERING SERVICES PI-388OCEAN OUTFALL
144451 CENTURY PAINT 5215.88 PAINT SUPPLIES
140452 CENTURY SAFETY INST.B SUPPLY $1.243.99 SAFETY SUPPLIES
144453 CERFNET $68.64 COMPUTER SERVICES
1444M CHANDLER LIQUID ASSET MONT. $8,400.00 INVESTMENT CONSULTANT M.0.2-8-95
144455 CHEM SERVICE,INC. $132.69 LAB SUPPLIES
144456 CHEMWEST,INC. 5418.27 PUMP PARTS
144457 CLONTECH LABORATORIES,INC. $148.36 LAB SUPPLIES
144458 COUCH AND SONS $1.147.50 CONSTRUCTION 29-R1
14a59 COUCH 8 SONS $30,857.94 CONSTRUCTION 11-17-1
54 144460 COMPUSERVE 5286.43 COMPUTER SERVICES
x 144461 CON-WAY WESTERN EXPRESS $60.47 FREIGHT CHARGES
144462 CONVERSE CONSULTANTS O C $3,1162.40 CONSULTING SERVICES M.O.8-11.93
144463 COOPER CAMERON CORP. $327.73 INSTRUMENT PARTS
H 1"464 COORDINATED EQUIP CO..INC. $175.00 MECHANICAL PART
144465 COSTA MESA AUTO SUPPLY 5235.27 TRUCK PARTS
1444M COUNTY WHOLESALE ELECTRIC 5214.66 ELECTRIC PARTS
rJ 144467 CA DEPT.OF HEALTH SERVICES $3.493.00 TRAINING REGISTRATION
144468 DELTA DENTAL PLAN OF CALIF. $58,261.47 DENTAL INSURANCE PUN MO.1.1 2-M
144469 DIGITAL EQUIPMENT CORP. $8.091.90 SERVICE AGREEMENTS
144470 DISCO PRINT COMPANY $84.46 OFFICE SUPPLIES
144471 DOVER ELEVATOR COMPANY $940.00 ELEVATOR MAINTENANCE
14 72 DUNN EDWARDS CORP. $379.06 PAINT SUPPLIES
144473 E.C.S. $167.00 PUBLICATION
144474 EASTMAN.INC. $1,065.95 OFFICE SUPPLIES
144475 ENCHANTER,INC. 53,920.00 OCEAN MONITORING M.O.6-1092
144476 ENVIRONMENTAL RESOURCE ASSOC. $750.50 UB SERVICES
140477 ERNST 6 YOUNG $17.690.00 REVIEW OF FINANCE DEPT.M.0.9.14-94
144478 MON 00. $8,537.58 REFUND USER FEE OVERPAYMENT
144479 FLUID TECH.SALES $413.67 INSTRUMENT SUPPLIES
144480 FMC CORP. $34,170.96 HYDROGEN PEROXIDE M.0.9.14-94
144401 FST SAND AND GRAVEL.INC. 5256.25 ROAD BASE MATERIALS
144402 FALCON DISPOSAL SERVICE $335.00 RESIDUALS REMOVAL M.O.IG-9-91
14a83 FEDERAL EXPRESS CORP. 5529.75 AIR FREIGHT
144484 FISHER SCIENTIFIC CO. 5289.79 UB SUPPLIES
144495 FL0-SYSTEMS.INC. 5188.33 PUMP PARTS
144486 FOUNTAIN VALLEY CAMERA $22.02 PHGTOSUPPLIES
144487 DST,INC. $4,681.17 OFFICE EQUIPMENT
144488 GTE TELEPHONE OPERATIONS $300.00 TELEPHONE CABLE SERVICES
1"489 GAUGE REPAIR SERVICE $1,730.21 INSTRUMENT PARTS
144490 GIERUCH-MITCHELL,INC. $2,981.15 PUMP PARTS
144491 GA INDUSTRIES,INC. 51,539A0 PLUMBING SUPPLIES
144492 GRAHAM COMPANY 5400.00 INSTRUMENT PARTS
144493 DGA CONSULTANTS $5.500.00 SURVEYING SERVICES M.0.69-94
144494 DAVID M.GRIFFITH B ASSOC. $1,10637 PROF.SERVICES-EXEC.SEARCH
144495 HARBOUR ENGINEERING $10.399.56 PUMP PARTS {r
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 511M5 PAGE3
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/03195 POSTING DATE 05/03195
WARRANT NO. VENDOR AMOUNT
144496 HARRINGTON INDUSTRIAL PLASTIC $1,217.09 PLUMBING SUPPLIES
144497 PL HAWN CO,INC. $32,054.66 INSTRUMENTS/INSTRUMENT PARTS M.O.3-10-93
144495 HEWLETT PACKARD $72.20 LAB SUPPLIES
144499 HIBINO USA.INC. $20,257.00 OFFICE EQUIPMENT
1"500 HOME DEPOT $263.90 SMALL HARDWARE
144501 IRS HUGHES CO,INC. $1.260.19 PAINT SUPPLIES
144502 HYCLONE LABORATORIES.INC. $378.54 LAB SUPPLIES
144503 IPCO SAFETY $539.45 SAFETY SUPPLIES
144504 IMPERIAL WEST CHEMICAL $88,543.21 FERRIC CHLORIDE M.OA 1.18-92
144505 INDUSTRIAL THREADED PRODUCTS $269.19 CONNECTORS
P1 144506 INGERSOL4LLND EQUIP.CORP. $103.91 COMPRESSOR PARTS
5 1"507 INTERMOUNTAIN SCIENTIFIC CORP. $227.59 LAB SUPPLIES
H 1N50B INVITROGEN CORP. $299.76 LAB SUPPLIES
tp 1"509 J2 PRINTING SERVICES $1.164.78 PRINNNG
^" 144510 JAMISON ENGINEERING $546.10 CONSTRUCTION SERVICES
`4 1"511 GREAT WESTERN SANITARY SUPPLY. $156.13 JANITORIAL SUPPLIES
m 144512 JENSEN INSTRUMENTS CO. $332.47 INSTRUMENT PARTS
1 144513 JOHNSON CONTROLS,INC. $219.79 ELECTRIC SUPPLIES
w t"514 JOHNSTONE SUPPLY $395.18 ELECTRIC PARTS
1"515 THE KEITH COMPANIES $248.10 ENGINEERING SERVICES 3.36R
144516 KING BEARING,INC. $304.99 MACHINE SUPPLIES
144517 KNOK INDUSTRIAL SUPPLIES $1,238.01 TOOLS/SAFETY SUPPLIES
144518 LADDER MAN,INC. $90.00 TOOLS
144519 LAKEWOOD INSTRUMENTS 54,118.22 MECHANICAL PARTS
1"520 LEARN KEY $54.95 TRAINING VIDEO
1"521 K.P.LINDSTROM,INC. $9,738.43 CONSULTING SERVICES-ENVIR.M.O.12-9-90
144522 MBC APPLIED ENVIRONMENTAL $970.00 OCEAN MONITORING M.O.&1&92
144523 MPS $204.88 PHOTOGRAPHIC SERVICES
144524 MACOMCO $577.20 SERVICE AGREEMENT
144526 MAINTENANCE PRODUCTS,INC. $654.52 MECHANICAL PARTS
144628 MARVAC DOW ELECTRONICS 5809.21 INSTRUMENT SUPPLIES
144527 MEDLIN CONTROLS CO. 5485.03 GAUGES
144528 NATIONAL TECHNICAL INFO SVC. $250.00 SERVICE AGREEMENT
144529 MISSION ABRASIVE SUPPLIES $236.51 HARDWARE
1"530 MISSION INDUSTRIES $3.202.73 UNIFORM RENTALS
144531 MITCHELL INSTRUMENT CO. $138.00 ELECTRIC PARTS
144532 MLADEN BUNDCH CONSTRUCTION $108,107.57 CONSTRUCTION 141-IA
1"533 MOTEL 60125&1-C $1.933.10 REFUND USER FEE OVERPAYMENT
1N534 NATWESTMARKETS $750.00 INTEREST DRAW FEES
1"535 NATIONAL PLANT SERVICES $2,600.00 VACUUM TRUCK SERVICES
144536 NATIONAL SAFETY COUNCIL $140.70 SAFETY FILM RENTALS
1"537 NETWORK GENERAL $6,0W.00 COMPUTER NETWORK CONSULTING
1"638 NEUTRON $10,405.45 ANIONIC POLYMER M.O.&1&84
144539 NEWARK ELECTRONICS $545.78 INSTRUMENT PARTS
144540 NORMS REFIG.8 ICE EQUIP. $28.81 ELECTRIC PARTS
144541 OCCUPATIONAL VISION SERVICES $1.317.02 SAFETY GLASSES
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/1195 PAGE 4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID OSI03/95 POSTING DATE 05/03/95
WARRANT NO. VENDOR AMOUNT
1"542 OLYMPIC CREATIONS $861.22 OFFICE SUPPLIES
144543 ORANGE COUNTY AUTO PARTS CO. $187.65 TRUCK PARTS
144544 ORANGE COUNTY CHEMICAL $2,900.04 CHEMICALS
1"545 ORANGE COUNTY WHOLESALE $9.584.81 ELECTRIC PARTS
144546 ORANGE VALVE 8 FITTING CO. $640.62 FITTINGS
144547 OXYGEN SERVICE $3,194.66 SPECIALTY GASES
144548 COUNTY SANITATION DISTRICTS $15.520.66 REIMBURSE WORKERS COMP
144549 POD SCIENTIFIC CORPORATION $721.48 LAB SUPPLIES
144550 PSI $237.74 HARDWARE
144551 PACIFIC PARTS $30.9D4.72 OFFICE EQUIPMENT
1"552 PAGENET $1,009.32 RENTAL EQUIPMENT
>< 144553 PARAGON CABLE $36.78 CABLE SERVICES
S 144554 PARALLAX EDUCATION $7.236.00 TRAINING REGISTRATION
144555 PARKHOUSE TIRE CO. $334.76 TIRES
1445E PERMA SEAL $546.02 INSTRUMENT SUPPLIES
r4 144557 COUNTY SANITATION DISTRICTS $3.148.86 REIMBURSE PETTY CASH,TRAINING B TRAVEL
144558 PIMA GRO SYSTEMS,INC. $109,220.93 RESIDUALS REMOVAL M.O.54491
I 144559 PIONEER STANDARD ELECTRONICS $6.029.43 COMPUTER SOFTWARE
c 1"560 PITNEY BOWES $302.88 POSTAGE MACHINE SERVICE AGREEMENT
144561 POLY CAL PLASTICS,INC. $205.65 MECHANICAL PARTS
1"552 POLYPURE,INC. $18.223.21 CATIONIC POLYMER M.O.3-11-92
1"553 POWER DESIGN $29.396.28 OFFICE EQUIPMENT
1"564 POWER SYSTEMS $1,31o.5a TRUCK PARTS
144565 PROFESSIONAL SERVICE IND. $2.128.00 SOIL TESTING
144586 PUBLIC FINANCIAL MGMT.,INC. $10,278.79 FINANCIAL CONSULTING SERVICES M.O.84P94
144567 PRYOR REPORT $99.00 TRAINING REGISTRATION
144568 RAHN INDUSTRIES $347.03 ELECTRIC PARTS
1"509 REDWINGSHOES $493.93 REIMBURSABLE SAFETY SHOES
140570 THE REGISTER $676.60 NOTICES 8 ADS
144571 REMEDYTEMP $4,053.21 TEMPORARY PERSONNEL SERVICES
1"572 RICOH ELECTRONICS,INC. $17.748.19 REFUND USER FEE OVERPAYMENT
144573 RODNEY-HUNT CO. $863.88 MECHANICAL PARTS
1"574 DR.ROOTER SERVICE $250.00 PLUMBING SERVICES
1"575 SANTA ANA ELECTRIC MOTORS $3,464.54 ELECTRIC PARTS
1"576 SANWA FE INDUSTRIAL PLASTICS $221.88 PLUMBING SUPPLIES
1445T7 SANWA BANK $4.997.49 CONSTRUCTION RETENTION Wl-IA
144578 DOUG SARVIS $760.00 CPRIFIRST AID TRAINING
144579 R.CRAIG SCOTT B ASSOC. $6,137.52 LEGAL SERVICES-PERSONNEL ISSUES
144500 SERPENTIX CONVEYOR CORP. $3,123.12 MECHANICAL PARTS
144561 SHAMROCK SUPPLY $121.16 TOOLS
144562 LAWRENCE SHAPIRO,MD $136.80 MEDICAL CLAIM
144583 SHURELUCK SALES $1.333.09 TOOLSMARDWARE
144584 SOUTHERN COUNTIES OIL CO. $8.430.77 DIESELIUNLEADEO FUEL
144565 SPEX INDUSTRIES,INC. $336.22 LAB SUPPLIES
144586 STRATAGENE $730.77 LAB SUPPLIES
144507 SUPELCO,INC. $88.24 LAB SUPPLIES
C
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 511195 PAGE 5
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 06/03/95 POSTING DATE 05103/95
WARRANT NO. VENDOR AMOUNT
144588 TEKMAR COMPANY $151.64 LAB SUPPLIES
144589 CHARLES E.THOMAS $102.18 TRUCK PARTS
144590 THOMAS BROS MAPS $3,798.19 PRINTING
144591 THOMAS FISH CO. $588.25 LAB SUPPLIES
1"592 TRAVEL EXECUTIVES $1,197.00 TRAVEL SERVICES MO.B-S-94
144593 TRUCK 6 AUTO SUPPLY,INC. $279.03 TRUCK PARTS
144594 TRUESDAIL LABS $20.159.80 LAB SERVICES
144595 U.S.AUTO GLASS CENTERS $160.88 TRUCK PARTS
144596 ULTRA SCIENTIFIC $507.00 LAB SUPPLIES
144597 UNIS0URCE5/0R BUTLER PAPER $337.37 OFFICE SUPPLIES
144598 UNITED PARCEL SERVICE $237.88 PARCEL SERVICES
X 144599 VWR SCIENTIFIC $2.995.34 LAB SUPPLIES
m 144600 VALIN CORPORATION $278.55 MECHANICAL SUPPLIES
W
1N 01 VALLEY CITIES SUPPLY CO. $2,830.87 PLUMBING SUPPLIES
146602 VANIER BUSINESS FORMS $1,114.71 OFFICE SUPPLIES
"-1 144603 VERTEX COMPUTER CABLE PRODUCTS $397.33 OFFICE EQUIPMENT
1q 1446M CARL WARREN S CO. $300.00 INSURANCE CLAIMS ADMINISTRATOR
I W606 WATER ENVIRONMENTAL FED. $101.25 PUBLICATION
144606 WATERS CORPORATION $92.28 LAB SUPPLIES
144607 WATERUSE MEMBERSHIP $275.00 MEMBERSHIP DUES
144808 WESTERN STATES CHEMICAL SUPPLY $45,354.61 CAUSTIC SODA S HYPOCHLORIDE M.0.8-124284-13.94
144609 WEST-CITE SUPPLY CO. $254.73 ELECTRIC SUPPLIES
144616 CITY OFWESTMINSTER $4,281.25 MANHOLE ADJUSTING
144611 WIRTH GAS EQUIPMENT CO. $4,799.87 INSTRUMENT
144612 ROURKE.WOODRUFF 6 SPRADLIN $66,253.92 LEGAL SERVICES M.O.2-19.92
1"613 XEROX CORP. $12,006.27 COPIER LEASES
144614 GEORGE YARDLEY CO. $663.77 HARDWARE
144615 JOHNSON YOKOGAWA CORP. $380.04 INSTRUMENT SUPPLIES
144616 RICHARD YOUNG PRODUCTS $146.96 TRAINING VIDEO
144617 ARAMARK SERVICES,INC. $17.N OPERATING SUPPLIES
144618 GENERAL TELEPHONE CO. $298.19 TELEPHONE SERVICES
144619 MERRILL LYNCH CAPITAL MARKETS $72,616.44 REMARKETING AGREEMENT
144620 PACIFIC BELL $1,215.62 TELEPHONE SERVICES
144621 MCJUNKIN-REPUBLIC SUPPLY $3.90 PLUMBING SUPPLIES
144622 SO CALIF.EDISON CO. $34,823.16 POWER
144623 SO.CAL.GAS.CO. $61,516.49 NATURAL GAS
1.769.947.87
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5I195 PAGE 6
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CIAIMS PAID 05/03/96 POSTING DATE D5103/95
SUMMARY AMOUNT
01 OPER FUND $7.065.63
02 OPER FUND 21,549.35
02 CAP FAC FUND 3,929.50
03 OPER FUND 35,065.61
03 CAP FAC FUND 17,315.67
05 OPER FUND 6.706.64
O6 OPER FUND 4.672.86
ly 07 OPER FUND 7,420.18
x 011 OPER FUND 10,899.96
m Ott CAP FAC FUND 31.116.31
013OPERFUND 101.37
914 OPER FUND 1,044.28
"I 014 CAP FAC FUND 118,537.05
m 03 S 11 OPER FUND 2,500.00
0687 OPER FUND 210.71
m 07914 OPER FUND 19.79
JT OPER FUND 804,282.45
CORP 405,663.40
SELF-FUNDED INSURANCE FUND 78,626.43
JT DIST WORKING CAPITAL 210,240.65
1,769,947.87
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/12815 PAGE 1
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/17195 POSTING DATE 05/17/95
WARRANT NO. VENDOR AMOUNT DESCRIPTION
1"652 AGTECHCOMPANY $33.357.67 RESIDUALS REMOVAL M.0.10-9-9/
1"653 ATM AA,INC. S1.680.00 LAB SERVICES
1"654 AT BT-UNIPLAN SERVICE $2,558.66 LONG DISTANCE TELEPHONE SERVICES
IMS55 AT&T-MEGACOMSERVICE $967.80 LONG DISTANCE TELEPHONE SERVICES
1"655 A T&T-FAXIMODEM SERVICE S22.89 LONG DISTANCE TELEPHONE SERVICES
144657 AIR PRODUCTS&CHEMICALS $36.074.40 O&M AGREEMENT OXY GEN.SYST.M.O.8.9419
1"658 AMERICAN PROTECTIVE SER.,INC. 51,O7.29 SECURITY SUPPLIES
1"659 AMERICAN SIGMA $1.528.10 SAMPLER PARTS
L.I 144660 ANGEL SCIENTIFIC PRODUCTS,INC. $520.17 LAB SUPPLIES
X 144NI APPLIED SIOSYSTEMS,INC. $075.02 LAB SERVICES
N 144662 ABC LABORATORIES $470.00 LAB SERVICES
la 144663 ASBURY ENVIRONMENTAL SERV. $35A0 WASTE OIL REMOVAL
H 144664 AUTOMATIC DATA PROCESSING $5.314.79 PAYROLL SERVICES
144665 BFI MEDICAL WASTE SYSTEMS $8.00 WASTE DISPOSAL
m 144666 BKK LANDFILL $2.630.16 RESIDUALS REMOVAL M.0.10.9�91
144667 BRWSAFETY&SUPPLY 563BW SAFETY SUPPLIES
144668 SAUER COMPRESSOR $66.71 COMPRESSOR PARTS
144669 BAXTER DIAGNOSTICS,INC. S427.35 LAB SUPPLIES
144670 BEACON BAY ENTERPRISES,INC. SMAS TRUCK WASH TICKETS
144671 BERENDSEN FLUID POWER 5444.99 ENGINE PARTS
1"672 BETA TECHNOLOGY,INC. 526.69 INSTRUMENT PARTS
144673 810 VENTURES,INC. $237,00 LAB SUPPLIES
144674 BOOT BARN $10/.73 REIMBURSABLE SAFETY SHOES
144675 BORLAND INTERNATIONAL E35L64 COMPUTER SOFTWARE
144676 BOYLE ENGINEERING CORP. $36.291.61 ENGINEERING SERVICES 7-7-1&P141
144677 BRONSON,BRONSON&MCKINNON S40,363.08 LEGAL SERVICES-COUNTY BANKRUPTCY M.0.12-8-94
144678 BUDGET JANITORIAL S4,320.00 JANITORIAL SERVICES
144679 BURLINGTON SAFETY LAB,INC. $175.50 INSTRUMENT PARTS
144660 TOM BYER ROOFING SERVICE,INC. $1.588.00 BUILDING REPAIRS
144681 CEPA $1,030.50 LAB SUPPLIES
144682 CS COMPANY $4,714.33 PLUMBING SUPPLIES
1"683 CALTROL,INC. $1,914.85 INSTRUMENT PARTS
144664 CALIFORNIA AUTOMATIC GATE E6OOA2 SERVICEAGREEMENT
144685 CASHCO,INC. $733.0 PLUMBING SUPPLIES
1"686 CERFNET $48.31 COMPUTER SERVICES
144667 COMPRESSOR COMPONENTS OF CA $274.78 VALVE PARTS
144668 CONNEL GM PARTS/DIV. $48.04 TRUCK PARTS
144689 CONVERSE CONSULTANTS O C $822.45 CONSULTING SERVICES M.O.8.11.93
1"690 COOPER CAMERON CORP. $634,77 COMPRESSOR PARTS
1 W91 COSTA MESA AUTO SUPPLY $243.39 TRUCK PARTS
1"692 COUNTERPART ENTERPRISES $647,48 COMPRESSOR PARTS
144693 COUNTY CLERK $38.00 JOB NO.7.24 EXEMPTION FEE
1"694 COUNTY CLERK 538.00 ANNEXATION FILING FEE
1"695 COUNTY WHOLESALE ELECTRIC $3.371.16 ELECTRIC PARTS
1"695 STATE OF CALIFORNIA 58,841.00 STATE UNEMPLOYMENT INSURANCE
1"697 DE GULLE&SONS GLASS CO. $1,171.84 GLASS
FUNONO 91M - JT DIST WORKING CAPITAL PROCESSINGDATE 5/12/95 PAGE2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID ON17/95 POSTING DATE 0U17MS
WARRANT NO. VENDOR AMOUNT
144690 DELL MARKETING L.P. $2.972.98 OFFICE EQUIPMENT
144899 DEZURICK AND/OR CS CO. $1.044.44 VALVES
144700 LASCLEAR $65.13 LAB SUPPLIES
144701 DICKSONS $1,827.44 AIR CONDITIONER
144702 DIGITAL EQUIPMENT CORP. $2.555.37 COMPUTER SOFTWARE
144703 DUNN EDWARDS CORP. $235.97 PAINT SUPPLIES
1447" OVALS SALES $51.90 FITTINGS
144705 EASTMAN.INC. $429.15 OFFICE SUPPLIES
144706 ECOANALYSIS,INC. $1,320.00 CONSULTING SERVICES
X 1"707 EL-COM HARDWARE $312.70 ENGINE PARTS
144708 JIM ELO $377.19 LIABILITY CLAIM J-CSD-9&L-7
144709 EMERGENCY MGMT NETWORK 53,815.00 SAFETY SUPPLIES
IM710 ENCHANTER,INC. 53,360.00 OCEAN MONITORING M.O.6.10.92
'J 144711 ENVIRONMENTAL RESOURCE ASSOC. E750.W LAB SERVICES
.y 144712 EXIDE ELECTRONICS $742.65 INSTRUMENT PARTS
I 144713 FALCON DISPOSAL SERVICE $9,220.00 RESIDUALS REMOVAL M.O.1041-91
^' 144714 FILTERUNE CORP. $185.83 FILTERS
1"716 FISCHER&PORTER CO. $394.75 INSTRUMENT PARTS
144710 FISHER SCIENTIFIC CO. $1.273.98 LAB SUPPLIES
IM717 CLIFFORD A.FORKERT $2.715.55 SURVEYING SERVICES M.0.64494
144718 CITYOF FOUNTAIN VALLEY $1.865.00 HAZARDOUS MATERIALS DISCLAIMER
144719 GST.INC. $11,473.55 OFFICE EQUIPMENT
144720 GANAHL LUMBER CO. $96.49 LUMBERJHARDWARE
144721 GATES FIBERGLASS INSTALLERS $N5.50 FIBERGLASS REPAIRS
IM722 GENERAL TELEPHONE CO. $995.95 TELEPHONE SERVICES
IM723 GIERLICR-MITCHELL,INC. $1,092.59 PUMP PARTS
144724 GLOBAL NETWORK/JOHN NAISBITTS $195.00 SUBSCRIPTION
144725 GRAPHIC DISTRIBUTORS $4,490.49 PHOTOGRAPHIC SUPPLIES
1"726 GRASSY S.T.I. $3,370.34 ENGINE PARTS
144727 DGA CONSULTANTS $1.460.00 SURVEYING SERVICES M.O.&&94
144726 DAVID R.GRIFFIN $27,071.65 LEGAL SERVICES-TECHITE PIPE M.O114-94
144729 HB TYPE 6 GRAPHICS $10.78 PRINTING
144730 HACH COMPANY $1,249.36 LAB SUPPLIES
144731 HARRINGTON INDUSTRIAL PLASTIC 3421.46 PLUMBING SUPPLIES
144732 HATCH&KIRK,INC. $2.641.93 ENGINE PARTS
144733 HAULAWAY CONTAINERS $550A0 CONTAINER RENTALS
1447M HERTZ CLAIM MANAGEMENT $2,083.33 WORKERS COMP CLAIMS ADMIN.
144735 HOLMES B NARVER,INC. $68.059.77 ENGINEERING SERVICES 2A4-R-2
144736 HOME DEPOT $229.70 HARDWARE
144737 RS HUGHES CO,INC. $122.56 PAINT SUPPLIES
144736 CITY OF HUNTINGTON BEACH $14.330.25 WATER USE
144739 HUNTS FINAL PHASE $1,350.00 CONSTRUCTION SERVICES
144740 IPCO SAFETY $2.046.63 SAFETY SUPPLIES
1"741 IMPERIAL WEST CHEMICAL $54,215.05 FERRIC CHLORIDE M.O.11-18-92
144742 INDUSTRIAL FILTER MFG. $2.922.00 FILTER
144743 INDUSTRIAL POWER SYSTEMS $171.00 INSTRUMENT PARTS
FUNDNO 9199 - JT GIST WORKING CAPITAL PROCESSINGDATE 5/12195 PAGES
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05117/95 POSTING DATE OW17/95
WARRANT NO. VENDOR AMOUNT
144744 INDUSTRIAL THREADED PRODUCTS $896,15 CONNECTORS
144745 INTERMOUNTAIN SCIENTIFIC CORP. $562,47 LAB SUPPLIES
144746 INTERSTATE SAT TERY SYSTEMS $656,68 BATTERIES
144747 IRVINE PHOTO GRAPHICS $88.36 PHOTOGRAPHIC SERVICES
1"748 IRVINE RANCH WATER DISTRICT 539.59 WATER USE
144749 JAMISON ENGINEERING $27,907.23 CONSTRUCTION SERVICES
144750 GREAT WESTERN SANITARY SUPPLY. $234.36 JANITORIAL SUPPLIES
144751 JENSEN INSTRUMENTS CO. $1,997.10 GAUGE
m 144752 JOHNSTONE SUPPLY $1.188.13 ELECTRIC PARTS
a4 144753 KARS'ADVANCED MATERIALS,INC. $2.497.00 MACHINE TESTING
z 144754 KING BEARING.INC. $3.718.29 MACHINE SUPPLIES
m 144755 KNOK INDUSTRIAL SUPPLIES $3.823.52 TOOLS
144756 L A CELLULAR TELEPHONE CO. $897.55 CONNECTION FEE REFUND
H 144757 LAIDLAW ENVIRONMENTAL SERVICES $429.00 WASTE DISPOSAL DRUMS
„1 1447M DAVID D.VANGELLE,PH.D. 54,358.00 TRAINING SYSTEMS IMPLEMENTATION GUIDE
I 144759 LAW OFFICES OF ROBERT L.LAVOIE $627.40 LEGAL SERVICES-NITZEN
144760 LEE B RO CONSULTING ENGR. $30,498.93 ENGINEERING SERVICES PI 40-182
144761 CHARLES P.CROWLEY CO. $754.38 INSTRUMENT SUPPLIES
144762 LEHMAN BROTHERS,INC. $246.58 REMARKETING AGREEMENT
144763 LEWCO ELECTRIC $592.63 TRUCK PARTS
144764 LOCAL AGENCY $500.OD ANNEXATION FEES
144765 MAGNETROL $456.25 ENGINE PARTS
144766 MARGATE CONSTRUCTION,INC. $327,729.00 CONSTRUCTION P242.2
1a767 MAVERICK,INC. $5.340.00 CRANE INSPECTION
144768 MCKENNA ENGR.6 EQUIP. $5,829.53 PUMP PARTS
144769 MEDLIN CONTROLS CO. MINAS INSTRUMENT SUPPLIES
144770 MICROBIAL INSIGHTS,INC. 5800.00 CONSULTING SERVICES M.OT 1-1&92
144771 MICROBICS CORPORATION $1,404.97 CHEMICALS
1"772 MIDWAY MFG,B MACHINING $1,725.00 MECHANICAL REPAIR$
144773 MILLTRONICS $1.930.03 INSTRUMENT PARTS
144774 MISSION INDUSTRIES $3,901.14 UNIFORM RENTALS
144775 MORELAND B ASSOCIATES $404.25 FINANCIAL AUDIT SERVICES
144776 MOTION INDUSTRIES,INC. $270.05 FITTINGS
144777 NATIONAL SAFETY COUNCIL $311.01 SAFETY FILM RENTALS
144770 NEAL SUPPLY CO. $1.823]2 MECHANICAL PARTS
1"779 NEUTRON $3.455.42 ANIONIC POLYMER M.O.&1&94
144780 NEOTRONICS $215.30 INSTRUMENT PARTS
1"781 CRY OF NEWPORT BEACH $66.92 WATER USE
144782 NORTHWESTERN NATIONAL $9,664.10 DISABILITY INSURANCE
144763 OI CORPORATION $314.79 LAB SUPPLIES
144784 ORANGE COUNTY AUTO PARTS CO. $142.73 TRUCK PARTS
144785 ORANGE COUNTY BUSINESS JOURNAL $79.00 SUBSCRIPTION
144786 ORANGE COUNTY CHEMICAL CO. 52,152.57 CHEMICALS
1"787 ORANGE COUNTY WHOLESALE $4,314.83 ELECTRICAL SUPPLIES
144788 ORANGE COURIER $511.50 COURIER SERVICES
1"789 ORANGE VALVE B FITTING CO. $1.473.66 FITTINGS
FUNDNO 9199 - JT DIST WORKING CAPITAL PROCESSINGDATE WIVIIS PAGE4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/17195 POSTINGO MOW17M
WARRANT NO. VENDOR AMOUNT
144790 PARASITOLOGY RESEARCH LABS $125.00 LAB SUPPLIES
1M791 PSSI f1,500.00 SEWERVIDEOINSPECTION
IM792 PACIFIC MECHANICAL SUPPLY 594.94 PLUMBING SUPPLIES
144793 PACIFIC PARTS 58,225.99 OFFICE EQUIPMENT
144794 PACIFIC BELL $136.78 TELEPHONE SERVICES
144795 PADRE JANITORIAL SUPPLY 5484.88 JANITORIAL SUPPLIES
1M798 PALMIERI.TYLER,WIENER. $980.00 LEGAL SERVICES M.O.6-12-91
144797 PARKHOUSE TIRE CO. $360.96 TIRES
144798 PASCAL AND LUDWIG 513.W3.00 CONSTRUCTION P243
to 144799 PASCAL III LUDWIG $6,376.50 CONSTRUCTION P142
m 144800 COUNTY SANITATION DISTRICTS 58,581.47 REIMB.PETTY CASH,TRAINING B TRAVEL
1MS01 PIERCE CHEMICAL COMPANY $162.00 LAB SUPPLIES
144802 PIMA ORO SYSTEMS,INC. $10S.W6.01 RESIDUALS REMOVAL M.0.54F91
H 1M803 PIONEER STANDARD ELECTRONICS $43.188.20 OFFICE EQUIPMENT
1MSO4 PLAN HOLD CORP. $516.57 OFFICE FURNITURE
1M805 POLYMETRICS,INC. $1.262.75 LAB SUPPLIES
c 1M806 POLYPURE,INC. $15.947.33 CATIONIC POLYMER M.0.3.11.92
1"W7 POWER SYSTEMS 5701.36 ENGINEERING PARTS
144808 HAROLD PRIMROSE ICE 5175.W ICE
144809 PROFESSIONAL SERVICE IND. 3368.00 SOILTESTING
1M810 PRYOR REPORT $79.00 TRAINING REGISTRATION
144511 RUN COMPUTER SERVICES,INC. $7,723.76 COMPUTER SERVICES
1M812 RPM ELECTRIC MOTORS 53,033.65 ELECTRIC MOTOR PARTS
144813 RAINBOW DISPOSAL CO. $1,715.43 TRASH REMOVAL
1M814 THE REGISTER $652.OD NOTICES B ADS
144815 REMEDYTEMP S3,594.40 TEMPORARY PERSONNEL
144816 ROYCE PRODUCTIONS $323.25 PUBLICATIONS
1M817 SANTA FE INDUSTRIAL PLASTICS $526.12 PLUMBING SUPPLIES
144818 SARTORIUS CORP. 5482.39 INSTRUMENT REPAIRS
1M819 DOUG SARVIS $1,125.00 CPRffIRST AID TRAINING
1M820 SCHWING AMERICA $3.234.51 PUMP PARTS
1M521 CITY OF SEAL BEACH 3480.00 ENGINEERING INSPECTION-3-36
1"622 SHURELUCK SALES f4,304.88 TOOLSMRDWARE
144823 SKYPARK WALK-IN MEDICAL CLINIC 5584.00 PRE-EMPLOYMENT PHYSICAL EXAMS
1"024 SO COAST AIR QUALITY $4.149.25 PERMITFEES
1M825 SOUTH COAST AIR QUALITY 512,810.00 CLEAN AIR ACT FEE
144826 SO CALIF.COSTAL WATER $299.740.00 ANNUAL SCCWRPA FEES M.O.2-9.94
1M827 SO CALIF.EDISON CO. $0.675.46 POWER
IW20 SO.CAL.GAS.CO. $9.347.07 NATURAL GAS
1NS29 SO.CALIF.WATER 00. $77.52 WATER USE
1448M SOUTHERN COUNTIES OIL CO. $10.673.03 DIESELRJNLEADED FUEL
1M831 SOUVENIR PHOTO $107.44 PHOTOGRAPHIC SERVICES
1M02 SPARKLETTS DRINKING WATER $74.25 DRINKING WATERICOOLER RENTALS
101133 SPECIAL PLASTICS SYSTEMS,INC. $2.038.84 MECHANICAL PARTS
1M834 STATE BOARD OF EQUALIZATION $=.OD ANNEXATION FEE
144835 STATE BOARD OF EQUALZATION $200.00 ANNEXATION FEE
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/12J95 PAGE 5
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05H7195 POSTING DATE O5117M
WARRANT NO. VENDOR AMOUNT
1M636 SUNCLIPSE,INC. $728.33 REFUND USER FEE OVERPAYMENT
IMS37 SUNSET FORD $517.90 TRUCK PARTS
144838 SUPELCO,INC. $134.60 LAB SUPPLIES
144839 SUPER CHEM CORP. $414.62 JANITORIAL SUPPLIES
144640 TAYLOR-DUNN MFG.COMPANY $1,112.52 ELECTRIC CART PARTS
144MI TEKTRONIX,INC. $305.55 OFFICE EQUIPMENT
144M2 THOMPSON INDUSTRIAL SUPPLY $987.56 MECHANICAL PARTS
144543 TOXIC MARINE 8 FIRE $954.34 LIABILITY CLAIM 3-CSD 95 L-6
I» 1MB4 TONYS LOCK 8 SAFE SERVICE $103.09 LOCKS S KEYS
K 144645 TRAVEL EXECUTIVES $1,667.19 TRAVEL SERVICES M.O.e- 94
5 1M846 TRUCK B AUTO SUPPLY,INC. $911.00 TRUCK PARTS
1M847 TRUESDAIL LABS $1.749.56 LAB SERVICES
144848 JIG TUCKER S SON,INC. E2B3.35 INSTRUMENT PARTS
H 1M849 ULTRA SCIENTIFIC 9597.00 LAB SUPPLIES
1M850 UNITED PARCEL SERVICE $116.24 PARCEL SERVICES
I 1M851 DATAVAULTIUS SAFE DEPOSIT CO. $2M.00 DATA STORAGE
1M852 VALIN CORPORATION $450.35 MECHANICAL PARTS
144853 VALLEY CITIES SUPPLY CO. $318.51 PLUMBING SUPPLIES
1M654 VORTEX INDUSTRIES $849.00 BUILDING REPAIRS
144855 WATERS CORPORATION $37.33 LAB SUPPLIES
1M856 WECO INDUSTRIES.INC. $7,087.64 MECHANICAL PARTS
144857 WGRA WORKSHOPS 3345.00 WORKSHOP REGISTRATION
1"858 WESTERN STATES CHEMICAL SUPPLY $37.735.71 CAUSTIC SODA S HYPOCHLORIDE MD.&12A284-13-94
1M859 WEST-LITE SUPPLY CO. $192.M ELECTRIC SUPPLIES
1M860 WITEG $716A7 LAB SUPPLIES
144WI XEROX CORP. $9.922.22 COPIER LEASES
1M862 ZYMARK CORP. $265.48 LAB SUPPLIES
144M DAVID R.GRIFFIN $75,000.00 LEGAL SERVICES-TECHITE PIPE M.O91i 94
61,W9,73Sn
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/12/95 PAGE 8
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMSPAIDOWIT/95 POSTING O M05117/95
SUMMARY AMOUNT
02 0PER FUND 2.891.13
82 CAP FAC FUND 68,959.77
03 OPER FUND 63.698.14
93 CAP FAC FUND 113,316.03
95 OPER FUND 5.42SM
97 OPER FUND 5.652.64
m 97 CAP FAC FUND 11,492.69
P4 911 OPER FUND 4.798.62
2 011 CAP FAC FUND 355.00
514 CAP FAC FUND 2,160.00
4535 OPER FUND 2.837.94
'9 4887 OPER FUND 3.161.25
,y 07&14 OPER FUND 0.221.73
JT OPER FUND 449,899.42
0` CORF 471.N7.11
SELF-FUNDED INSURANCE FUND 4.042.26
JT DIST WORKING CAPITAL 454,347.47
1,689,739.72
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954.2, 1 hereby certify that
the Notice and Agenda for the Regular Board Meeting of Districts Nos. 1, 2, 3, 5, 6, 7,
11, 13 and 14 held on /lr 19Vwas duly posted for public
inspection in the main lobby of the Districts' offices on yy�' 190
IN WITNESS WHEREOF, I have hereunto set my hand this A_day of
19Q�
Penny Kyle, r o ach of the
Boards of Directo of County Sanitation
Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13& 14
of Orange County, California
BWO.1 F27A