July 1, 1987
NOTICE OF REGULAR MEETING
DISTRICTS NOS, 1, 2, 3, 5, 6, 7, 11, 13 & 14
WEDNESDAY, JULY 8, 1987 - 7 : 30 P.M.
10844 Ellis Avenue
Fountain Valley, California
The next regular meeting of the Boards of Directors of County
Sanitation Districts Nos. 1, 2, 3, 5 , 6, 7, 11, 13 and 14 of Orange
County, California, will be held at the above hour and date.
s3cretary
Scheduled Upcoming Meetings:
DISTRICT NO. 3 - Wednesday, July 15th, at 7:00 p.m.
SELECT COMMITTEE TO - Thursday, July 16th, at 5:30 p.m.
ADVISE THE STAFF
EXECUTIVE COMMITTEE - Wednesday, July 22nd, at 5:30 p.m.
COUNTY SANITATION DISTRICTS
Af ORANGE COUNTY, CALIFORNIA
RO.BDX 812) _
FOUNTAIN VALLEY.CALIFORNIA 92728.W'--'
1 OBAA EUIS AVENUE ,
FOUNTAIN VALLEY.CALIFORNIA 92]09-)OW
M41340.291D
1714IS82-2411
JOINT BOARD AND EXECUTIVE COMMITTEE MEETING DATES
Joint Board Meetings Executive Committee Meetings
July Jul 08, 1987 Jul 22, 1987
August Aug 12, 1987 None Scheduled
September Sep 09, 1987 Sep 23, 1987
October Oct 14, 1987 Oct 28, 1987
November Nov 18, 1987 None Scheduled
(NOTE: This is a
change from the regular
meeting date of 11/11/87
which is Veteran' s Day)
December Dec 09, 1987 None Scheduled
January Jan 13, 1988 Jan 27, 1988
February Feb 10 , 1988 Feb 24, 1988
March Mar 09 , 1988 Mar 23, 1988
April Apr 13 , 1988 Apr 27, 1988
May May 11, 1988 May 25, 1988
June Jun 08, 1988 Jun 22, 1988
July Jul 13, 1988 Jul 27, 1988
COUNTY SANITATION DISTRICTS
OF
ORANGE COUNTY
PIITATION
5e`cp.litan ��s+
Il!I¢I
i; Q�
ti
Since 1951,
NGE COUNT
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
COUNTY SANITATION DISTRICTS
Ef ORANGE COUNTY. CAUFORNIA
1O n AVENUE
P.m Eox elan
June 25, 1987 EwNruN VAUEY.WIMRWSEYd",v
naves 11
TO: Boards of Directors
SUBJECT: Transmittal of Individual Districts' Budget Recommendations for 1987-88
Fiscal Year
The proposed 1987-88 budgets for each of the nine Districts are enclosed for your review
and consideration. The budget package was reviewed by the Executive Committee on June
24th. The Executive Committee recommended that these proposed budgets be presented to
the respective Boards for consideration at the July 8th joint meeting.
SUMMARY
The proposed 1987-88 budgets total $403.8 million. down 2.0% over the 1986-87 budget
total of $412.0 million.
The following table compares the proposed 1987-88 .budgets with the 1986-87 budgets to
highlight the major areas of changes in the upcoming year.
CCNPAWTIVE BUDGE( SlM4ARY
INCREASE 1987-88
REQQI1IRD MS 1987-88* 1985-87* DE02�FA`£ % OF BUDGET
MIRf•1fEFA'FIITNI WJM 0 8 M $ '•' -
CCUECTIOi SYSTEM 8 TIDIER DISTRICT 0 8 M 4.9 4.1 0.8 1.2
TREATMENT R M CONSIRIICTIOI APPROPRIATIONS 57.7 50.1 7.6 14.3
DISIRICT SRO CONSTRICTION APMOPRIATIOS 73.0 BD.5 (7.5) 18.1
EMT SERVICE 11.5 12.3 (0.8) 2.9
SUB-TOTAL $ $I.T 177.5 $ 3.6
CONSTRUCTION RESERVES 117TT
OOffR RESEIT-
TOTAL QUIRE)OTS -$ ll(Yj� elf I1.8
SUB-MIAL1.8 4.3 IME
FINDING
UNTZIfiR $ 29.6 $ 32.4 $ (2.8) 7.3%
APPROPRIATED RESERVES 292.1 180.2 111.9 72.4
SUB-TO $=TAL �r =
TAX ALLOGIIION (1% SiARE) �2� �
TAX LEVY FOR BOND REDEMPTION 1.2 0.7 0.5 0.3
CCNSIRRICTIOi GVMTS 7.3 2.4 4.9 1.8
FEES 17.2 22.8 (5.6) 4.2
INTEREST & Me 29.3 148.8 119�.5) 7.3
SUB-TDIA. S as"•' ---'--
TOTAL FINDING
* AJISTED FOR INTER-DISIRICT TRANSACTIOS
The sources and applications of the 1987-88 budgetary dollar are depicted in the
following charts:
DISTRICT
.18 ANAIIAB E FUM BALANCE
CONS11=01 �.n1s Ol .80
RESERVES O'S�'" �,,�E
.43 V .03 LEVY .O1
OF JOINT '1RX ALLOQ1707
II7T � 07
PfiNl
E1 ga� 02
la
A
BUDGETED REQUIREMENT DOLLAR SOURCE OF BUDGETED REVENUE DOLLAR
TOTAL $403.8 MILLION TOTAL $403.8 MILLION
The Districts' share of the 1% ad valorem property tax levy, allocated in accordance
with Proposition 13, is appropriated to the operating funds of the respective Districts
to pay operations, maintenance and replacement/rehabilitation costs pursuant to the
Revenue Program (approved by the Joint Boards in April , 1979) adopted to comply with
regulations of the Environmental Protection Agency (EPA) and the State Water Resources
Control Board (SWRCB).
We have assumed for budgetary purposes that average annual tax allocations will
increase at the following percentages as provided by the County Auditor-Controller:
District * %
1 4.1448
2 14.7235
3 12.7059
5 17.0764
6 9.5293
7 11.5148
11 12.7163
* Districts 13 and 14 receive no ad valorem tax allocations.
-2-
Over the next ten years, Districts 5 'and 14 appear to have adequate revenues to finance
their ongoing operations and maintenance costs. Districts 1, 6 and 13, which have
already established user fees, may need to consider fee increases during this period to
make up deficits presented on the table below. Districts 2,3,7 and 11 may also need to
establish user fees to supplement their existing ad valorem tax revenues and industrial
user fees, which will be inadequate to meet their operations and maintenance requirements
during this period. -
SIMMRY Cf OPEPKIOIS AM KINfENANCE FINANCING"
9
(Millions of Dollars)
1987-M 1991-92 1996-97
Start w Receive Have Total End with End with
Dist. Reserves Revenues Available Reserves or 1992/97 1992/97 Reserves or
No. of of Funds of Ewe Deficit of Ca mittmerts Remmes Deficit of
1 $ 3.1 $ 24.1** $ 27.2 $ 26.5 $ .7 $ 53.4 $ 47.2 $ (5.5)
2 11.8 61.8 73.6 75.9 (2.3) 152.8 111.7 (43.4)
3 8.7 69.3 78.0 80.9 (2.9) 162.9 119.2 (46.6)
5 3.2 17.4** 20.6 15.7 4.9 31.5 37.4 10.8
6 2.2 13.2** 15.4 13.1 2.3 26.4 23.3 (0.8)
7 4.5 21.3 25.8 22.6 3.2 45.4 32.9 (9.3)
11 2.3 14.3 16.6 22.6 (6.0) 45.3 25.2 (26.1)
13 .2 .' .8 .9 (.1) 1.8 1.0 (0.7)
14 12.7 6.8 19.5 6.3 13.2 12.6 13.0 13.6
Total $48.7 $228.8 $277.5 5L64.5 $13.0 a.1 $410.9 $ 108.1
*Not adjusted for inter-district transactions. See individual Districts' cash flow
statements for detail .
**Includes user fees
When tax revenues become insufficient to fund the residential community's share of
operating and maintaining the Districts' facilities in the future, alternative funding
sources will have to be adopted to supplement the taxes.
The viable alternative methods are.
(1 ) Hearing and separate levy of user charge on the property
tax bill
(2) Separate user charge collected on water purveyor's utility bill
(3) Direct billing by Districts of a separate user charge
(4) Election to authorize separate ad valorem tax levy.
District No. 5 implemented a user fee effective with the 1981-82 fiscal year to fund
increasing operating costs and major sewer rehabilitation work. District 6 adopted a
user fee beginning in 1983-84. District 13 implemented a user fee effective January 1,
1985. District 1 implemented user fees effective July 1, 1985.
Under the Revenue Program, industrial/large commercial users are presently charged on
the basis of actual use and receive credit for ad valorem taxes paid pursuant to the
uniform industrial waste ordinance adopted in 1970 and amended in 1975 and 1983.
Institutional/tax-exempt users are also billed separately by the Districts based on
actual use.
-3-
The timing of any user charge implementation will depend upon the fiscal year in which
the ad valorem tax allocation and available reserves become inadequate to cover 0 & M
costs (line 14 of the cash flow projections).
The major portion of the Districts' funding requirements for the next ten years is for
construction of new facilities to handle rising sewage flows and provide improved
treatment.
SUMMARY OF PROJECTED EXPENDITURES
1987/88-1996/97
1987/88- 1992/93-
1991/92 1996/97 TOTAL
Treatment Plant Construction $286,609,000 $ 46,495,000 $ 333,104,000 23.71
Trunk Sewer Construction 110,061,000 41,447,000 18552,508
52,508,00) 10.9
$7?tZTO 0D 1T- $98;'94Z TW $ S 61Z'UOO
Treatment Plant and Sewer O&M 262,047,000 527,505,000 789,552,000 56.2%
Debt (Including CDP's and RA's) 65,484 000 63 312,002 118,796,000 9.2
Total Expenditures ,20 0 6 9, 59,0 0 1,403,960,000 300.0%
Capital financing for sewers and treatment and disposal facilities will be provided by
accumulated construction reserves and interest, grants, fees and sale of capacity
rights. The proceeds from sale of certificates of participation issued by Districts Nos.
1,2, and 3, in August, 1986 are included in the following summary of Capital Financing
table. The three districts which sold certificates of participation will pay their -
proportionate shares of the next two years of Joint Works capital expenditures from the
proceeds of the securities sale, and the other six districts (Districts Nos. 5,6,7,11,13
and 14) will pay their proportionate shares from existing capital reserves and other
capital revenues. -
SIMMRY OF CAPITAL FINANCING*
L987/88-1996/97
(Millions of Dollars)
1987-88 MI-92 1996-97
Start w/ Receive Have Total End with End with
Dist. Reserves Revenues Available Reserves or 1992/97 1992/97 Reserves or
No. of of Funds of Exile Deficit of Camdttents Revenues Deficit of
1 $21.6 $ 11.5 $ 33.1 $ 41.9 $ (8.8) $16.2 $ 2.7 $(22.3)
2 96.2 36.2 132.4 146.9 (14.5) 45.8 10.0 (50.3)
3 94.2 3&7 132.9 132.5 0.4 36.9 7.6 (2&9)
5 9.4 18.2 27.6 30.6 (3.0) 8.2 10.9 (0.3)
6 5.1 &6 13.7 16.5 (2.8) 4.6 1.6 (5.8)
7 27.9 13.9 41.8 23.7 18.1 3.0 10.0 25.1
11 9.4 27.6 37.0 37.6 (0.5) 11.5 3.5 (8.5)
13 5.9 5.2 11.1 3.0 8.1 17.8 2.7 (7.0)
14 0.3 26.0 26.3 25.7 0.6 3.5 3.7 0.8
Total $270.0 $185.9 $455.9 $458.4 8 2.5 $147.5 $52.7
*Not adjusted for inter-district transactions. See individual Districts' cash flaw
statenaRs for detail. Includes District 2 purchase of land for an upstream Water
Reclanation Plant in cooperation with the Orange Comity Water District.
-4-
COmly MUTATION DISTRICT- a 6124107 -
INTEREST OF PROJECTED CAN FLU PAN 5A
FISCAL FEARS 1907-H WRWW 1996-91
1992-951
tin 1907-N 190-0 198b0 19%-91 19,91-m ' $-Yar lout 1996-97 IO-Year Total LIRE
-_- ....... .--».. ....... ....... ....... � ».......... ----------- -_----_---- ----
OPL%TOg FO%
1 --Desnns 6 Grry-Oar, ha GCS You 18,10,00 15.711,0AB II,SN,OD U,m8,N0 2S,NI,NO i 0,10,00 12,977,00 18,70,00 1
......... ..:....... ......... ........... ......_... r ----------- ---------- ...........
Seem
2 Slur.of It is Allocation 27,133,000 30,5119,00 34,501,00 9,958,000 11,007,00 175,195,00 323.416,00 H8,611.0m 2
I' Fees S.M. 3 1,70,00 9,019,000 10.218,00 11,520,00 i /3,075,00 N,752,00 IN,627,00 3
/' Internet A Xiuollaaous I... S,U2,o0 2,I21,N0 I,ABI,NO 1,3U,om 843.00 'i 9,U1,00 2,N5,0AB 12,361,00 1
5 (Lear 56t0e0 D 0 5
-----"-_- ....._... ----------- ------.... ......... i "_------- ----------- •----......
6 TOTAL REVENUE U,NS,ON IO.sO,em IS,U1,00 %,559,00 N,3U,00 ( 2%,6s3,00 110,973,000 6N,6N,00 6
-..... , ---------- ---------- -----------
7 DIAL AVAILABLE MAINE 81,03.0on 86,271.M 86,855,011) 0,587,00 81,959,000 i 271,111,00 123,950,00 60,3N,hob 1
_ ----------- ----------- i ---------- --------- ---------
U MDIlURO
1 .1Nre di Joint Boren R 1 0 JS,9P7,M 39,00,00 I/,%8,00 51,690,00 59,IN,Oo i M.151,00 161,/13,4e0 690,567,00 8
9.'! :Collection Sates R 6 0 and Other our. 1,AB5,00 5,613.00 6,152,00 7,/16,000 8,527,001 i m.893100 H,m2,m0 %,g%,m0 9
W. other Eea00inores /9.00 ml,Om 900,00 1,011,00 ) 2,N7,o0 /.659,00 7,0N.00 10
....... ........... ........... ........... ( ........... ........... ...........
II: - OGL.ERPOOITCRES 38,N2,40 11,711,000 51,m7,t0 O,o0,00 ®,9m,Om i NI,OI,ow 50,111,00 M.578,00 11
. ---------- ----------- ......... ........I -----_... i —...__ ----------- ..........
Mo...A terry-Oar, G Meet Year 15,771,00 41,524.00 35,128,00 5,581,00: 12,977,00 i 12.977,00 (IN,191,0e0) (%8,191,00) 12
e 13' Aat year',Dry Period Funding DeouUegentst 31,851.00 21,839,00 25,299,00 a A9,2%,00L 33,677,00 i 11,60,00 N.192,000 0,792,00 13
SEA. Fn0lhlan0 or (Deficit) U,917,M 19.60.M 9,729,00 (3,715,000) (0,10,00) i (0,70,00) (171,906,0)(1) (111,06,00) 11
: G9IIfl fWO(1)
I 15 he.,6 terry- Iran Last Iran you 210,0I2,000 219,726,00 IN,U 0 N S,00 ,]%,00 2/,BHOD, i 20.0I2,0e0 (2,/11,OD) 210,012,00 15
.........-- ----------- ----------- ----------- ----""---.. � '----------- •--.»....- -----------
AH L
U. 6raG 7,30,011 1,60,00 9,00,00 9,60,00 9,60,000 ! G,70,00 LOOKS" 39,=,om 16
17 leas: Connection 1,%7,om S,IN,OOD /,UB,Om /,9U,OD 1,90,00 i 21,m9.0E0 W,N0,00 H,%9,00 17
IB Othwu 6,9m,00 9,316,00 10,N1,000 5,018,000 3,6%,00 U.79i'm 17,118,00 52,90,00 %
19'. S%e of Capacity Rights /.3]t.om 00,00 1,618,00 12,241,400 MAN 1 19,IU,00 1,U2,00 21,35S,00 19
0 Interest L RisWGnaa Ina. 17,6%,8AB 12.916,00 6,09,00 3,332,00 2.324.00 1 0,931,00 7,010,00 0,011,00 0
21 Inner-foM Transfer s0,00 s0,01 Smooth 21
22 Other Income 6.2%,ND 1.521,OD 7,1%,OD 3.40,005 1 2/,6U,00 a%,h0 N,90,00 22
-----"--- --"--_-- --------_ ----------- --------- i --------- ---------- -----------
23 TOTAL RIVERN 17,91/,10 37,350,00 10,30,WD 39,319,00 20,966,e00 i I05,915,00 S2,)20,000 2U,6U,m0 U
»----... .......... ....•.... .....---... ......... ---------- ..».-.._- '.---.....
21 TOTAL AVAILABLE FUNDING 317,956,00 211,076,00 115,121,M m,711,00 H.80,100 i 455,927,000 50,2H,00 50,647.M 21 -
----------- ----------- ......---_ --..-- ---....... i ----------- ----------
EXPENDITURES
25 am"At Joint Bats Tr.Genl Plat 37,659,030 91,750,00 10,000,000 0,10,00 19,10,00 i N6.6H,N0 46,495.00 316,1N,0AB 25
26 Oislrict C011edue Stel. 17,881,000 29,721.00 211,641,00 17,637,400 11,I71,000 110.061,00 42,111,000 Im,50,00 IS
21 COP G...at 10,070,W0 10,917,00D 11,09.00 10,9%,00 10,891,N0 U,9N,000 52,116,000 10,%2,00 0
28 Reimburseaenl Agr.leal Payments 1%,00 BAB,000 1.122,No 1.121,00 I,Im,ND I,IOI,NO 5,6m,00 10,012,00 %
29 other Expenditures 2,161,00 N/,00 3,318,00 3,U8,00 29
........... ........... ........... ........... .....».... i ---------- ----------- ..........
SO TOTAL EXPENDITUES AB,2d0,o0 10,01,019 121.719,000 67,857,00 48,291.440 1%,3%,00 1/7,526,600 60,m1,00 0
'---------- ----------- ----------- ----------- --------- __-"-__ ---------- -------'-.-
31 RV,,ree5 I Cury-Par to Am Year 211,726,00 I34J85.014 53.3%.00 21,I51,000 (2./11,10) i 12./11,01) 197,277,00) (%,277,0 ) 31
MAIL SANITATION DISTRICT- ALL 6124/8/
S1ATERM1 Of PROJECTED CASH ILM pees 511
FISCAL %MIS I M-M NUMB 1M5-%
19%-931
LINE 19117-I0 191E-99 19M-M 1990-91 1911-92 S-Year Total 1996-91 10-Lwr Total LIKE
.... ....... ....... ....... ....... ....... I ------------ ----------- ------------- ----
BOND FMD(S)
32 Reserves L COry-Over from last Year 2,811,04 1,AM,OM gn.00 35O,W0 81,00 i 2,071.000 0,000 2,011,444, M
.......... ........... ........I-- ----------- ........... I ----------- ----------- -----------
RESCUE
33 Tee Lary 1,1%,aM 6M,Me 65,000 35,00 240,M0 I 2,1%,006 M,MO 2,180,M0 A
% Interest A Riscollan0m IMose 112,01y0 IM,MO 45,M0 15,0M 6,00 166,000 4.0%) 30,080 34
35 Other Income - 0 35
......_. ........... ........... ........... ........... I ----------- ----------- ...........
36 TOTAL OFFERS[ 1,MB,OM 731,00 110.00 %,0M 246,OM i 2,501,000 M,OM 2,530,00 36
........... ........... ........... ........... ---------- i ----------- ----------- ...........
31 TOTAL AVAILABLE FMOIM 6,229,01, 2,129,000 I,OM,00o 6M,000 333,000 i 5,312,000 118,0M S,401,40) 31
......._-- ----------- ----------- ----------- ----------- - ----------- ----------- -----------
UMDIIURM I
HE Rod princippl A Internet 1,135,00 1,6M,OM 732.00 , 313,00 244,01) i 6,101,00) FT.= 6,1%,M0 M
39 !.,turd Transfer Sa;OM 16,00 S16,M0 S16,M0 39
40 OtM, Ewerdilorea 60
.......... ----------- ----------- ----------- ----------- - ----------- ----------- --- -------
61 TOTAL EXPENDITURES 2,2v;00 1.751,00 732.00 313,OM 246,000 I 5,223,000 89,M0 5,312,OM 61
........... ........... ........._ ........... ........... , ----------- ----------- ...........
42 Mums AWry-OMr to Meet Lwr I,9M,M0 912,Mo 150,00 97.000 Amid, I Am,= 29,M0 29.00 42
63 Most year'.Dry marine fording Rewirewnte 1,9M,Mo 912,M0 tso,aoo 81,0M M,FM 89,M0 29,000 29,00 63
........... ........... ........... ........... ........... ........... ........... ...........
66 fond Balance or (Deficit) 0 0 a a 0 ; O 0 0 ad
............ ............ ............ ............ ............ ........... ........... ...........
SU0M8Y lAdlwted for Inter-Mad Iraasfers) ,
65 Mwrves A Curpoor frae Lost You 321,%1,OM 211,4M,006 I11,yB1,MD 86,I10,M0 %,522,OM M1,%I,oM 10,595,000 321,661,00 IS
66 TOTAL REYMUL 0,161,M0 18,%1,0%, 85,111,000 69,9I8,011 17,59U,00 417,049,00 60,7ZgaM M0,121,0M 66
.............. ........... ........... ........... ........... . ........... ........... ........
61 TOTAL MAILABLE FUNDING 606,828,80a 556,016,400 243,058,60 08,690,000 128,112,040 i 738,110,000 616,311,w0 1,202,612,00 61
40 TRIAL COUNTRIES 121,339,040 110,195,000 114,213,00 120,116,006 117,511,00 I 729,115,00 679,759.00 1,401,814,060 68
----------- ------..... ----------- --......... ----------- ----------- ----------- - ---------
69 Amrws A Cerry-Owr to Not year 211,AM,OM 111,211.00e M,110,000 50.522.00 10,5%0, D 10,595,0M (2M,Ka2,M0) (205,A62.00) 69
50 Met%6r's Dry Period NUNN Rewirwents 33,146,000 22,811,00 25,699,000 M,3M,Ma 13,166,000 I 11,166,040 66,62I,011 %,821,00 %
........... ........... ........... ........... ........... . ........... ........... . .........
51 FUND BALMCE M (DEFICIT) 245,643,00 15c,610,0M 63,121,0M 21,139,000 (23,171,000) I li3,li1,OM) 1212,263,0M) (212,263,M0) SL
11911-10 IMludes MW Invesbent Mpasit/Mrniarl presented on line 13 of District No. IN cash Ilse
w Wades IRV fan presented on line 17 at District No. 14 ease Flow
Although EPA and SWRCB have previously funded up to 871/2% of the cost of construction of
advanced treatment facilities, the most recent grant received by the Districts will
possibly fund only 30% of our latest grant project. Anticipated expenditures and grant
funding are reflected on CORF Schedule B-1. This schedule itemizes all projects into
grant funded and non-grant funded categories. If these funds are not forthcoming, any
projected deficits will be even greater.
The real long-term impact of federal and state requirements on District fiscal planning
will be on operating costs. While, as noted, EPA and SWRCB may fund a portion of
constructing facilities for a higher degree of treatment, the added ongoing operating
costs must be paid entirely by the local community. The Districts have 135 MGD (60 MGD
now in service at Plant No. 1 and 75 MGD now in service at Plant No. 2) of secondary
treatment on line. The approved Joint Operating budget increased by 11.3 percent for
1987-88. Should future EPA/SWRCB requirements force the Districts to construct and
operate full secondary facilities, our operating costs would dramatically increase. We
also expect that operating costs will continue to rise due to inflationary influences,
rising flows, increased costs of sludge disposal , and other regulatory requirements
imposed by such organizations as the South Coast Air Quality Management District. The
ten-year cash flow projections presented on the preceding pages for all Districts reflect
these increasing operating costs on line 8.
Staff, as part of the Revenue Program requirements, has reviewed connection fee
schedules to determine the feasibility of this revenue source for financing the
escalating cost of providing sewerage facilities to meet long-term facilities
requirements. User fees are also a potential source of funding capital needs in other
Districts.
The ten-year estimates include anticipated receipt of $20.4 million from SAWPA for sale
of an additional 7 MGD capacity and payments on its existing 8 MGD.
In the final analysis, the fiscal posture of each District depicted in the enclosed
projections will depend on economic trends and development activity within the service
areas of each member agency.
FUND DESCRIPTIONS
The budgets have been itemized separately for the operating, capital and debt
retirement elements of each District's budgetary structure to assist Directors in
analyzing the projections.
Operating Funds
Projected cost increases are, for the most part, directly attributable
to federal and state secondary treatment requirements and other regulatory
impositions such as the AQMD requirements regulating use of digester gas to fuel
our internal combustion engines. These new regulations require major increases
in chemical usage to lower hydrogen sulfide levels in our digester gas.
Inflationary trends are also reflected. A review of the operating fund cash flow
estimates (top section of the cash flow) allows the Directors of each Board to
determine when their respective District may have to consider alternative user
charge funding. Reference to line 14 on the ten-year cash flow will indicate when
a given District will be required to consider alternative revenue sources. When the
fund balance indicates a deficit (in parentheses) and there are no unappropriated
reserves available for transfer from capital accounts, the District will be required
to implement user fees.
-6-
Districts 5 and 7 are presently in a sound financial position. In fiscal year
1984-85, the District 2 and 7 Boards of Directors recommended that a portion of the
reserves in the Accumulated Capital Outlay (ACO) fund be transferred to the District
2 and 7 bond funds, which with anticipated annual interest earnings will provide
sufficient monies to pay both the remaining bond redemption and interest expense for
the life of those respective Districts' 1951, 1958, 1962 and 1970 general obligation
bonds.
Capital Funds
The capital funds include the accumulated capital outlay (ACO) fund, the
construction/COP payment fund, and the facilities revolving fund of each District.
These funds finance each District's share of Joint Works plant expansion costs, as
well as the individual Districts' trunk sewer and pump station requirements.
Treatment plant projects are listed on CORF Schedule B-1, and collection system
projects are listed on separate schedules under each District's budget
recommendations.
Bond Funds
Outstanding general obligation bond debt and interest obligations can be met by an
annual tax levy which is allowable under Proposition 13. Financially sound
Districts may elect to forego a bond fund tax levy and pay annual bond retirement
and interest from existing reserves. This determination has previously been made
each year during budget deliberations. As indicated above, Districts 2 and 7
carried out a transfer of capital and operating reserves at present value that will
pay the 1951, 1958, 1962 and 1970 general obligation bonds for the remainder of the
life of the bonds. District 3 also transferred a portion of its ACO fund reserves
to its bond funds to pay for its 1984-85 and 1985-86 bond retirement and interest,
but it is recommended that the District not continue this practice as its financial
position is less strong than in previous years.
IMPACT OF GANN (PROPOSITION 4) SPENDING LIMITATION INITIATIVE
Proposition 4, the statewide initiative which was passed by the voters in 1979, limits
appropriations of state and local governments from tax sources to a formula based on
changes in population and the cost of living (Consumer Price Index). If growth in per
capita income is less than the increase in the CPI, then the formula is adjusted to
reflect the lower of the two.
Staff has estimated the Districts' appropriation limits which will be presented as a
separate Agenda item and submitted to the Boards at the July 8, 1987 meeting of the
Joint Boards. Our calculations indicate that each District is within its authorized
limit as indicated in the table on the following page:
-7-
INDIVIDUAL DISTRICTS'
1987-88 TAX APPROPRIATION BUDGET COMPARISON WITH GANN LIMITATIONS
1987-88 District Net 1987-88
District Tax Appropriations Budget Gann Limitation
1 $ 0 $1,915,000
2 2,842,000 7,965,000
3 4.560,000 10,031,000
5 1,432,000 2.063,000
6 325,000 1,201,000
7 1,739,000 2,396,000
11 857,000 2,108,000
13 No tax appropriation budget Not applicable
(District is 100% financed by fees)
14 No tax appropriation budget Not applicable
(District is 100% financed by fees)
SPECIFIC BUDGET ITEMS -
Following is a brief discussion of the major elements of the budgets:
CARRY-OVER AND RESERVES: The appropriated reserves and carry-over consist primarily of
accumulated con truction reserves for financing improved treatment facilities mandated
by federal law and the master planned trunk sewer systems of the individual Districts.
Also included are operating fund contingency reserves and authorized general reserves
for the tax revenue cash flow dry period.
RtVENUE
Taxes: Tax revenue is split to two accounts:
Tax Allocation - This account represents the anticipated allocation of the
is riD E cts p rata share of the maximum 1% basic property tax allowed under
Proposition 13. The Districts average approximately 3% ($.03 for each $1.00)
of the basic levy. Districts 13 and 14 receive no tax allocation.
Tax Lev - This account represents tax funds necessary to make voter-approved
outstanding general obligation bond principal and interest payments. Under
Jarvis-Gann, tax levies to satisfy these obligations are not restricted. As
pointed out in the discussion on bond funds on the previous page, staff
recommends that the 1987-88 levy be waived for District 3, and that debt
service be financed by ad valorem taxes.
Federal/State Construction Grants: EPA and SWRCB have historically funded up to
7 2 of treatmentplant construction for approved projects. Estimates reflect
anticipated payments based on grant funding of those eligible projects indicated
-8-
on CORF Schedule B-1 at 80% (net) of project cost, except for the $5.5 million
hydraulic reliability project at Plant No. 2 (P2-25-2), for which we expect to
receive only 30% grant financing.
Fees: All Districts have an adopted sewer connection fee schedule. This account
T reflects industrial waste user charges levied by all nine Districts pursuant to
the Uniform Industrial Waste Ordinance and the Revenue Program, and the user fees
implemented in Districts Nos. 1, 5, 6 and 13. Annexation fee revenue is
indeterminable and, thus, not included in the estimates unless there is an existing
agreement providing for payment of fees.
Sale of Ca acit Ri hts: This account records income from sale of capacity rights
0 ou si a agencies suc as SAWPA and IRWD, including the capital replacement
charge. SAWPA is considering purchase of an additional 2 MGD in 1987-88 and 5 MGD
in 1990-91 under their existing agreement, and these revenues are included in the
10-year estimates.
Interest & Miscellaneous Income: Consists primarily of interest income from
investment of accumu a e cons ruction reserves and other miscellaneous items.
Other Revenue: On the cash flow statements this account generally reflects
in er- un ransfers.
EXPENDITURES: Other than reserve appropriations there are six major expenditure
components of the individual Districts' budgets, four of which have either previously
been acted upon or reviewed by the Boards, or established by contractual obligations or
outstanding general obligation.bond indentures.
Joint Works Treatment Plant Construction Pro'
ro ram: Adoption of the Capital Outlay
Revolving Fund Budget COR by t e oint Boards at their regular June meeting
established the requirements for this item, which accounts for 14.3 % of the 1987-88
budget. Included in the ACO Fund and Construction/COP Payment Fund budgets are
appropriations for the current year CORF budget and toward master-planned treatment
plant expansion costs that will total $333 million over the next ten years. Each
District's share is based on its respective equity percentage, which is computed on
a three-year average of flow from each District.
This account includes any annual purchase of additional joint works equity that
might be required due to a change in a District's proportional equity percentage.
Districts Nos. 3, 7, and 13 are required to purchase additional equity in 1987-88.
Unless otherwise noted, any such purchases or sales have been adjusted out of the
combined summaries and schedules.
District Collection S stem Consolidated Master Plan Construction Programs:
equi rements fort s item are essentially established by the indiv dual
Districts'adopted Master Plans of trunk sewers, but may be changed from time to time
at the option of the Boards. Sewer construction will total over $152,000,000 during
the next ten years.
Debt Retirement and Interest: These requirements are fixed by the indentures of the
respective general obligati
1987-88 funding.) on bond issues. (See comments above under Tax Levy re
Joint 0 eratin�Expenses: Requirements for this item were also established in
une y a optionn £�eJoint Operating Budget. Individual Districts ' shares of
this cost are based on their proportionate gallonage flow.
-9-
Reimbursement A regiment Payment: This account represents anticipated payments
ase on connec ion ees cot leczedj against outstanding reimbursement agreements
where a developer has constructed a master plan sewer or advanced connection fees
for such construction. District 5 presently has such agreements.
District Maintenance, Operating 8 Other Ex enditures: This item establishes
requiremeor maintenanc�pe�ation o t e individual Districts' sewer
collection systems and also provides for each District's general business. It
also includes any other miscellaneous costs or transfers not included in one of
the above items.
FUNDS
Following are comments regarding the several funds of each District's recommended
budget.
OPERATING FUNDS: The major item in the Operating Fund is the share of the Joint
Operating 135—dg—et which was adopted by the Boards in June. The remaining budget
accounts are primarily for maintenance and/or repair of the Districts' collection
system and for the incidental operating expenses which the Districts will incur. All
of the Districts have been in the midst of major trunk sewer expansion programs for
the past several years. As a result, budgetary requirements for sewer line and pump
station maintenance reflect increases for maintenance of these facilities as well as
increasing energy costs. Industrial monitoring costs which reflect the expense of
enforcing the use ordinance and EPA's pretreatment standards, which became effective
on April 27, 1984, are continuing to rise.
Following are further comments on the Operating Fund line item accounts:
Directors ' Fees: Provides for regular meetings and allows for compensation in
accordance witTi the fee schedule adopted by the respective Boards.
Share of Joint Operating: Represents each District's share of operating,
maintaining, and administering joint works treatment and disposal facilities, and is
allocated based on gallonage flow of each District. Amounts were established by
adoption of the Joint Operating Budget in June.
Trunk Maintenance: Provides for maintenance of each District's collection system
o tru— nc�rs. The several Districts presently have approximately 800 miles of
trunk and sub-trunk sewers ranging in size up to 96 inches as well as several
hundred miles of small local sewers serving two cities and various unincorporated
areas.
Manhole and Line Repairs: Provides for major contractual repairs to the
Districts' man�io el s and trunk sewers or pump station wet wells which have
deteriorated because of corrosion.
Puff
Station Maintenance: Provides for maintenance of Districts' pump and lift
stations. D stricts particularly coastal Districts 5, 6 and 11 as well as District
7) which have collection systems that cannot flow to the treatment sites by gravity
have one or more stations. Therefore, the costs among the Districts vary
considerably based upon the number of pumping facilities.
Permit and Industrial Waste Administration: Provides for the Industrial Waste
Division's administration of the Uniform Connection and Use Ordinance.
Requirements mandated by State and Federal regulatory agencies have caused
this item to increase substantially over the past few years.
-10-
Inter-District Sewer Use Charge: Provides for payment for inter-district flows
between certain Districts pursuant to basic accommodation agreements of said
Districts.
Bond Collection Expense: Several of the Districts' bond issues provide for coupon
re emption y ie anc of America which charges the Districts for said services
(with the exception of District No. 11).
Tax/Fee Collection Ex ense: The County charges a tax and supplemental user fee
co ection expense on a funds except bond interest and sinking funds.
Treasurer's Investment Administration and Bankin Fee: Fees charged the Districts
y the range County reasurer or placing specs is investments of Districts' funds
and handling commingled investments.
Utilities: Major item in this account is for power supplied to the Districts'
pump stations. Also includes telemetering on leased lines to the control center
at Plant No. 1, and water supply where needed at the pumping station sites.
Appropriations are increasing to reflect rising energy and water rates.
Professional Services: Appropriates funds for minor engineering, legal and
specia consu ting work for which the need arises from time to time in the
Districts.
Printing and Publication: This account provides necessary funds for publishing
actions and regulations of the Boards as well as the Districts' annual report to
the EPA and SWRCB.
Travel and Meetin ; Directors ' Mileae: Provides for reimbursement to Directors
Tor transporta ion to oar meetings and other functions.
Uncollectible Accounts: For bad debts related to the collection of industrial
user charges.
Interest Expense: For interest on purchase of joint works equity or on
ou stan ing reimbursement agreements, where applicable.
Prior Yeah: Represents adjustments to an account balance for the
previous year s .
Transfers: Usually reflects inter-fund transfers to complete previous accounting
Trans—actions aactions or to provide necessary supplemental funding. Similar transactions
may appear in other funds.
BOND FUNDS: Budget requirements for the Bond Funds are determined by the indenture of
eacTi is—sue and are established each year in accordance with legal requirements. (See
comments above under Tax Levy re 1987-88 funding.)
ACCUMULATED CAPITAL OUTLAY FUNDS: Generally, the major item in the Accumulated
Capital Outlay Fund (ACO Fund) is the individual District's respective share of the
Capital Outlay Revolving Fund Budget for joint treatment works expansion, which was
adopted by the Boards at the June meeting. In addition, the Districts also have a Master
Plan Construction Program in progress for which specific budget appropriations have been
recommended for contracts presently under way or planned in the near future. Other line
items in this fund are primarily for accumulated reserves for future construction in
accordance with the Districts ' and joint works master plans and federal and state
-11-
requirements, and purchase and sale of equity in jointly-owned treatment works as
provided for in the Joint Ownership, Operation and Construction Agreement.
FACILITIES REVOLVING FUNDS: All Districts have Facilities Revolving Funds to account for
connection Fee revenues and capital expenditures for improvements paid out of said fund.
District 5 has entered into reimbursement agreements for construction of Master Plan
sewers and repayment of the advances are made from these fees.
CONSTRUCTION/COP PAYMENT FUNDS: Districts 1, 2 and 3 issued Certificates of
artlC pat on s In August, Lvab to pay for their respective shares of the Capital
Outlay Revolving Fund (CORF) for joint treatment works facilities for a three-year
period. The major items in these funds are each District's CORF construction payment
share and the installment payments due on the COP's. Revenues are transferred into these
funds from the three districts' ACO funds and Facilities Revolving funds to make the
installment payments as the COP proceeds and interest earned on the proceeds are used for
CORF construction.
If Directors have any questions regarding the budget material , please contact Wayne
Sylvester or Bill Butler at your convenience to discuss them with us.
-12-
COUNTY SANITATION DISTRICT NO. 1
OF
ORANGE COUNTY
�PNlTAT10N
`togolitan 0 rQ
OAS
UO m = o N
en — G
Since 1954
Og9NGE CO'3
BUDGET RECOMMENDATIONS
1987-1988 FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 1 6/I1/11
BUDGET RECOMMENDATIONS
1907-18 FISCAL TEAM
DIMXT of Sa151T
_— .._._»................ ----------- ' ----------- ----------- '
I
ABUDE ARECOMMENDEDGETD
DESCRIPTIONSDESCRIPTIONSM OWIIRt BUDGET
BUDGDGETT BUDGET 1
905- 80
-- 19N-01 -------
AFgllltl[II! �
swriti"1 CMpd.. ..Ooirw..
;
r , r
PoeratlM hN � 5,979,ON 6,711,000 1 I,07,00 1
AtpuetllatN Capital OptlaT FtlN i 6,III,ON Il,tp.lN t) 9.866,100 ei
i I I
Construction fund ) ) I/,1N,001 i 15,17/,100 �
` = a
Facilities Revolving fun 105.M i BID'"$ i 116,OAN ei
i -_------- i ...........
SUBTOTAL OPERATING N CAPITA 12.M.M i 72.7111,101 i 72,7A.00 i
i
Debt Retirement
r r
, r
r i
Ban and Interest Fund - 1951 I51,3/5 158,450 )
111,131 -------
TOTAL REQUIREMENTS 111.443,11711 { 72,/95,750 52,197.4%
FUNDING
r �
r ,
r i '
Operating 6 Capital Funding
r
i
Cash 6 Inveeteents (Appropriated !
Reserves and Carry-Oven ( 8,143.m 111,115,IN 1 24,666,000
i
Other Revenue 7 71/75,IN ) 20,70/,0p0 ; 5,999,000 v'
i
Anticipated fax RIIOGIien ( i
From It Levy ( 1,711,100 i 1,453.00 ; 1,674,Op I
{ --------- i ---------» ( .._..__•__ i
SUBTOTAL OPERATING N CAPITA 12,EASE,10/ ( 72,716,IN 32,7A,O11
i
Debt Retirement
i
Cash L Investments (Appropriated
Reserves 6 Carry-Over) ( 13,775 ( 65,0 ( 97,/56
., Other Revenue ) 1710N II,ON I,la )
i
r
Amount Raised by taxes for ) )
Debt Obligation 55.w ) 74,212 ) By,Deep )
r
SUBTOTAL DEBT RETIREMENT 151,715 ) 10.756 ) 1511.4% 1 _
r
TOTAL FUNDING ) 13,041.M 32.495,750 ; 72,191,150
'Adjusted for Inter-Fund transfers
COUNTY SANITATION DISTRICT NO.I Page 1
BUDGET RECOMMENDATIONS 6117127
1987-88 FISCAL YEAR
FUND 11 OPERATING
_______________________________________ ___________ i ----------- i ----------- i ----------- i --------__-
REVISED ESTIMATED
APPROVED APPROVED ACTUAL I RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ; ; BUDGET
1985-86 1986.87 L986-87 1987-82
....................................... ........... i .......... i ----------- i ----------- ----------_
OPERRT[XG
Directors' Feet ; 6,000 ; 6,500 ; 6,800 ; ; 8,200
Contractual Services
Share of Joint Operating 3,119,000 3,220,000 2,807,200 3,630,000
Trunk Maintenance ; 25,000 ; 15,000 ; 21,600 ; i 30,400
Manhole Line and Wet Wall Repairs 20,000 10,000 14,400 J 17,500
Permit and Ind.Waste Admin. 155,000 ; S5,000 ; 164,700 ; ; 170,000
Connection Fee Admin. 5.000 ; 11,600 ; 72,000 i 17,400
Bond Collection Expense 300 100 200 200
Tax/Fee Collection Expense ; 3,000 ; S,S00 ; 6,100 ; 8,000
Treasurer's Investment Adm.
6 Banking Fees 7,400 ; 7,000 ; 8,400 ; ; 10,000
User Fee Expense i 50,000 ; 21,000 ; 20,200 ; ; 13,000
Professional Services ; 5,000 15,000 ; 1/,000 ; ; 17,000
Printing And Publication 1,000 i 7,000 i 900 5,000
Travel 6 Meeting - Directors S00 300 { 300 300
Uncol lectible Accounts 1,000----- ----- ---
TOTAL OPERATING 3,399,000 3,373,000 3,137,300 3,928,000
----------- i ----------- i ----------- i i -..--------
NON-OPERATING
Interest 90,000 i 61,000 61,000
Expenses Applicable to Prior Years 4,000 ..3,000 3,000
{ ----------- i ----------- i ----------- i i ------- ---
TOTAL NON-OPERATING i 94,000 70,000 67,000 3,000
----------- i ----------- i ----------- i i -----------
TOTAL OPERATING 6 NON-OPERATING i 3,493,000 3,443,000 3,204,S00 31931,000
----------- i ----------- i ---•---"'- i i ..-..------
RESERVES
,
,
Appropriation for Contingencies ; 699,000 ; 1,542,000 ; $11,489 ;s ; 786,000
Authorized General Reserve ; 1.747,000 ; 1,722,000 ; ; ; 1,966,000
i ----------- ----------- I ........... i i -----------
TOTAL RESERVES i 2,446,000 3,264,000 511,489 2,752,000
----------- i ----------- i ........... i i ---------7-
TOTAL REQUIREMENTS 5,939,000 6,707,000 3,715,789 ; 6,663,000
a Interest on Flow Based
Equity Adjustment Payment
COUNTY SANITATION DISTRICT NO.1 Page 2
BUDGET RECOMMENDATIONS 6117/87
1987-08 FISCAL YEAR
FUND 11 OPERATING
...................................... , ----------- ----------- ) ----------- ) ----------- -_--_--_---
REVISED ; ; ESTIMATED )
APPROVED APPROVED ACTUAL ) RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE ; SUBSET ; BOGEY ! EXPENO TVIIE ) BUDGET
1965-66 1906.07 1986-87 1987-08
AVAILABLE FUNDING
Cash { Investments
)Appropriated Reserves and ) ) ) ) )
Carry-Over) ) 805,000 S,560,000 ) 2,862,300 ) ) 3.087,000
----------- i ----------- r ----------- -----.-_.._
Fees ; 424,000 441,D00 ) 192,500 ) ) 300.000
Supplemental User Fees 816.000 961,000 ) 1,002,000 ' 1,362.000
Interest 6 Misc. Receipts 271,000 ; 242,000 ) SS9,200 ; ) 207,000
, r
Delinquent saxes 45,000
------ = ------ ) ------ ; ) ------
SUB-TOTAL ) 1,571,010 1.694,000 ; 1,596,500 ; ) 1,922,000
----------- ' ---------- � ------•---- � � _-_--------
r
Tax Allocation i 1.240,000 ) 1,310,100 i 1,356,600 i 1,4U8,000
i
Redevelopment Agency Pass-thfSUgll 111,010 ) 121,000 250,500 255,000
Subventions ; 20,000 ) 20,006 ) SS,700 ) 21,000
----------- i •--"--••-• i ----------- i i ""'------
SUB-tOTAL i 1.374,000 ) 1,453,000 i 1,622,800 i i 1,674,000
i -------•--- ---------- ----------- i i -•-•-------
Transfer from ACO Fund 2,187.000 ) ) ) )
i ----------- i -----"--•- i ----------• i i _-----•----
TOTAL AVAILABLE FUNDING 5,9S9,000 ) 6,707,000 ) 6,041,600 ) ) 61g31000
COUNTY SANITATION DISTRICT NO.1 6/17/81
BUDGET RECOMMENDATIONS
1987.08 FISCAL YEAR
FUND 11 ACCUMULATED CAPITAL OUTLAY
_______________________________________ _ ___________ _ ___________ i ----------- i ----------- -___-______
REVISED ESTIMATED
APPROVED ! APPROVED ACTUAL RECONNENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ( BUDGET
1985.86 1986-87 1916-81 1967-88
,
PROJECTS AND EXPENDITURES )
Tnalment Plant Expansion ; 5,621,000 ; 0 ; ; ; 0
Appropriation for Raster-Planned
Treatment Plant Facilities 1,045,000 8,358,000 ; ) 0,672,000
Flow Analysis t Metering $1,000'
Raster Plan/EIR Update gg,gp
Santa Ma/Dyer Road trunk Sower
Rehabilitation, 1-15A i i 22,173 i i Ig1,100
flow-based Equlty Adjustment ; 1,510,me 112171M
Earthquake/flood Dauge Rmserve ; 117,000 ) 213,001 711,000
i i i i i
Appropriation for District Facilities
Improvements and Expansion 5001000 5001014 710,000
,
SUBTOTAL 6,048,000 ) 10,288,001 22,473 9,066,000
i ----------- ---------- i ----------- ( ) ___________
Transfer to Operating Fund 2,189,000
------•---- i ---------' -----------
transfer to Bond Fund 22,001 22,000
COP Payment Transfer to Const. Fund ; i 1,311,0H
i ----------- i ----------- i -•---•---« i i --__-------
TOTAL REgUIREMENIS 9,437,000 ) 10,310,000 44,473 ) 11.247,000
AVAILABLE FUNDING ) )
_________________
Cash 6 Investments
(Appropriated Reserves and
Carry-over) i 7,230,000 i 6,116,011 i 6,395,S70 i i 8.346. 00
•___"_._'" i ----------- i --------••- i i -----------
Joint Barks Equity Sale 212,010 i 375.006 i S3S,811 i i 69.000
Equity Sale to District ll ; ; 1,985,000
Sale of Capacity Rights 380,000 4/8,000 61,199 /50,000
Fees 156,000 189,000 $2,500 ; 496,000
Federal and State Grants 735,000 251,010 I 0 ) ) 759,000
Interest and Xisc. Receipts 316,000 566,000 ; I2/,530 SIG,000
i
,
,
SUBTOTAL 1,799,000 ; 3,814,000 3,099,491 i 2,901,000
----------- i ----------- i ----------• i i -----__--•_
TOTAL AVAILABLE FUNDING i 9,037,000 10,310,000 i 9,425.061 i i 11,247,000
COUNTY SANITATION DISTRICT NO. 1 6117/87
BUDGET RECDMMENDATIONS
1987-BB FISCAL YEAR
FUND 11 CONSTRUCTION/COP PAYMENT
-------------------------------------- r ----------- r ----------- r -----------
ESTIMATED ;
APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE ; BUDGET ; EXPENDITURE ; BUDGET
I 1986-87 1906-87 1907-80
--------------------------- ---------- i ----------- r ----------- , --_--------
PROJECTS AND EXPENDITURES-------------------------
'
i
,
,
Treatment Plant Expansion 5,019.000 3,286,000 ; 5,979,000
,
Debt Issuance Cost ; 46,000
Appropriation for District ;
Facilities Improvements and ;
Extensions ; 8.275,000 6,089.400 a; 6.969,000
r ,
SUBTOTAL 13,340,000 ; 9,375,400 ; 12,940,000
r ----------- r ----------- r -----------
C2,126,00
OP Installment Payments = --------- = ------- = ---------
TOTAL REQUIREMENTS 14,958,000 ; 10.364,500 ; 15,074,000
, --_---____.
i
AVAILABLE FUNDING ;
r r
-----------------
, r
Cash and Investments
(Appropriated Reserves and !
Carry-over) 0 ; 12,108.000
,
i
Proceeds from Sale of Certificates
of Participation ; 14,677,000 ! 20,807.600 r
,
r
Interest 4 Misc. Receipts ; 281,000 ; 1,451.600 ; 760,000
r i
SUBTOTAL 14,958,000 22,2S9,200 760.000
r .__-------- r ____-_---- r ...........
TRANSFERS FOR INSTALLMENT PAYMENTS
r
----------------------------------
r
COP Payment Transfer from ACO feM ; 11381,---r
COP Payment Transfer from FA fond ; 745.000
SUB-TOTAL TRANSFERS 0 0 ) 2.126.000
i ----------- i ---------- i --_---__---
TOTAL AVAILABLE FUNDING 14,958.000 122,2S9,200 15,074.000
a Subsequent to approval of the 1986.87 budget, District No. 1 chose to include
the full cost of its flow-based equity payment in the Certificates of
Participation (COP) issue. The 86,089,000 payment Nas made from the proceeds
of the COP issue.
COUNTY SANITATION DISTRICT NO.I
BUDGET RECOMMENDATIONS 6/17/87
1987-88 FISCAL YEAR
FUND 11 FACILITIES REVOLVING
---------------___,--------—------- , __________
ESTIMATED
APPROVED ; APPROVED ; ACTUAL ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE BUDGET
( 1985-06 1986-91 1906-87 1987.08
,
PROJECTS AND EXPENDITURES------ '
r
r r r
r i r
,
i
r i
Santa Ana Trunk Sewer 100,000
r r r
Appropriation for District
Facilities laproveeents and
Extensions ; 10S,000 ; 270,000 ; ; ; 716,000
r ----------- r ___________ r ---------- , ,
SUB-TOTAL 105,000 ; 370,000 716,000
COP Payment Transfer to Coast. Fund 745,000
, r
TOTAL REQUIREMENTS 1051000 3701000 1 1,461,000
r
AVAILABLE FUNDING
_________________
Cash and Investments
(Appropriated Reserves and
Carry-over) i i 129,000 i 602,711 1,04S,000
----------- i ----------- ----------- i i
...........
Connection Fees 100,000 252,000 ) 1,4/0,000 ) 341,000
Interest 6 Misc. Receipts 51000 ) 9,010 ; 49,600 J p,000
r
SUB-TOTAL 10S.000 241,010 i 1,489,600 ) 416,001----------- ----------- i -----"---- i i ----------
TOTAL AVAILABLE FUNDS IOS,000 i 770,000 i 2,092,118 1,461,001
COUNTY SANITATION DISTRICT NO.1 6/Ii/A7
BUDGET RECOMMENDATIONS
1987-88 FISCAL YEAR
FUND 11 1000 AND INTEREST • 1951
....................................... ----------- i --------"' i ---------•- i ........... i -----------
i I i ESTIMATED I I
APPROVED I APPROVED I ACTUAL I I RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE I BUDGET i BUDGET I EXPENDITURE I I BUDGET
I 1985-06 I 1986.87 I 1986-87 I 1987h 08
....................................... I ----------- i ----------- ----------- i ........... I ..-..------
BOND RETIREMENT AND INTEREST
............................ I I I I I
Principe] On Bonds I 10,000 i 70,000 i 70,000 i I 70,000
Interest on Bonds I /
,375
..... 1 ----- i ..... i i ----
TOTAL I 77,875 I 76,125 i 11,958 I i 74,375
a----•--••a i
AUTHORIZED GENERAL RESERVE i 73.500 I 95,625 I I 84,075
----------- I ----------- i i i ------ ----
TOTAL REQUIREMENTS I 151,375 I 171,750 I I i 1S8,150
I ........... I -.......... I I I ...........
AVAILABLE FUNDING
_________________
Cash 6 Investments I I I I
(Appropriated Reserves and
Carry-aver) I 83,375 ; 65,538 I 63,860 ; 93,450
i ----------- ----------- I ........... i i -----------
I I I I I
Delinquent Taxes I 1,000 I $,000 I 1,/18 i i 2,000
Interest 6 Misc. Receipts I 6,000
----- I ----- I 1,081 i -----
SUB-TOTAL I 13,000 I 10,000 I 8,532 I I 8,000
i ----------- ----------- ----------- i i ......-----
AMOUNT 10 BE RAISED BY TAXES I 55.000 I 11,212 I 77,579 I I 51.000
i ----------- i --•-----•-- i ---•-""-- i -------•--•
TRANSFER FROM AID FUND I I 22,000 I 22,000
TOTAL AVAILABLE FUNDING I IS1,375 i 171,750 I 111,971 i i 158,450
I ........... I ........... I ........... I ........-__
Outstanding C.D. Bonds @ 6/30/87: $210,000
Final Payment Date: August, 1989
COUNTY SANITATION DISTRICT NO.1 6/II/87
SCHEDULE OF DISTRICT COLLECTION SYSTEM PROJECTS
PROJECT TOTAL C.I.P. 1907•OB 1988-09 1989-90 199"1 1991.92 1992-93 1993-94
........... .......... , ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------
,
i
,
Master Plan/EIR Update (a) 55,000 ) 40,000 15,000
i
Santa Ana/Dyer Road Trunk Saw
Rehabilitation, 1.15R (a) 1SO,000 ( 22,000 120,000
i
Miscellaneous (a) 100,000 ( 100,000 100,000 100,000 100,OD0 100,000 100,000 100,000
___________ __________ ___________ ___________ ___________ ___________ ___________ ----------
TOTAL 905,000 i ' 22.000 268.000 115,000 100,000 100,400 100,000 100,000 100,000
(a) Fully Funded
(b) Partially Funded
(c) Not Funded
CWNIY SANITATION OISIAICT NO.1
STATEMENT Of PAOCCIEO CASH FLON Pace 1
FISCAL YEARS 1901-68 TNAOUM 1196-97
1912-9J(
LINE Ital-all....... ....... 1989-w 199?91 fl.....91� S'Yvar Total IOtal LINE I ----- -----
OPEAAT011 FUND
I Reserves a Cu,-Oa, Ira.Last Year 3.0I,00 2'm.wd 2,514,we 2,151,0441 1,M.m I 3,0M.wo 717,00 3,wi,ow 1
......... ........... ........... ........... .......... --------- .....----- -----_....
REYENUE
2 She.01 It la Allocation 1,719,00 1,715,00 1,854,000 1,926100 2,NOT,,00 i 9.04,00 II.224,00 20,Sw.Van 2
3 Fees 1,670,00 2,M9,oes 21785100 3,3M,COD 3,90,w0 14.077,00 36,01,00 so.mo0M 3
a IAMrut 6 Nifaelluvou, IN,... 01,00 IBB,wo 16fi'm 151.00 w,00 112,00 0 7R,o0 t
5 other he... o 0 5
........... ........... .......... ........... ....._--- i _--------- ----------- ...........
6 TOTAL REVENUE 3,596100 4,112.00 6,05.010 5.317,000 6,043,00 24,133,000 11,285,00 71,3M.Ow 6
..._...... ........... ........... ........... ....._.... i ---------- ----------- ........._. .
7 TOTAL AVAIIASLE FUNDING 6,W,00 7,064,0041 7,349,010 1,521,00 1,593,00 i 21,220,00 4IpM,00 16,65,00 7
........... .......... ......... ........... -----..... , ----------- ----------- ...........
EXPENDITURES
8 Sure of Joint work,N 10 3,6w,00 4,174.00 8,10,00 3,520,00 6,349,00 ) 24,413,000 49'sai'm 1J,7M,0w 8
9 collection$sets.N A 0 W OLMr Ober. MI,00 W.dw Sw,00 END^ W.00 i 2,010,000 4,014,00 6,114,00 9
to Other Eawnditga, 0 0 10
.......... ........... ........... ........... .._..._.. ........... ........... ..__....
11 TOTAL EXPENDITURES 3,931.00 4,50,00 5,iw,we 5,91/,00 6.016.00 26,503,00 53,Ma,00 79,M7,00 11
........... ........... ........... ........... ........... ...........
12 MOrves A CA,,-mr 0 Nut Year 2.751.00 2,544,00 2,151,00 1.591100 711,041 i 717,000 (5,1w,0w) (S,0B4O0) 12
IS Nut Year's Dry Varied funding Aechireonnls 1,W,00 2,M0,00 2,599,00 2,1119,00 3,438,00 i 3,438,000 6,tt3,00 6,9M,ow IS
........... ........_. .......... ........... .._-----_ ---_----- ----------- ..........
M Fund Be]..0r (Deficit) 7M.00 Ma,M (411,100) p,6n,w0) (2,721.00) (2,121,000) (12,325,000) (12,325.00) M
CAPITAL 0NC(9)
IS a...A C...y-.er Fro Wt Year 21,SM,00 17,IM.00- 6.181,00 (2,1M,w0) (S,N1,Ow) ( 21.519,00 (B,U/,40) 8,5M,00 IS
........... .......... ........... .......... ..__.._ ) ........... ........... ...........
RETRACE
16 (contraction&ants 759,Ow I66100 9U,w0 w5,w0 se%onr i 3,910,00 I66100 6,076,CM 16
17 Feu: Camaction 3a9,00 341,w0 3a8,00 MI,C00 Ja8,00 i 1,740,00 1.70.4% 3,4w,0w 17
li at", AM,= 19,w0 U,00 w,00 10,00 i 819,000 50,00 1.415,00 18
19 Sale or tMacitY Rights 430,0D Bade 71.00 I,M9,o0 Aa,wO i 1,924,00 20,00 2.124.00 19
20 Interest 6 Niue11e00s Income 1,374,Ow 819,00 159,00 0 0 2,302,000 0 2,3112,00 20
21 Other luxe 650,w0 60,40 6w,dms 21
........... ........... ........... ........... ........... ........... ........... ......_._.
M t01AL AEVEJUE 4,077.111111 1,5311,014 1,672,000 2,710,Ow 1.490.00 i 11.40.00 2,70,011 I4,187,00 22
.........-- ._........ ........... ........... ........... i ----------- ---------- -----_----
M TOTAL AVAILMLE FUNDING M.656,w0 I2,719,00 8,653,000 MISS (41451106) i M,OM,00 (61135100) M'laa.m 23
........... ........... ........... ........... ........... i ....._.... ----------- -----------
EXPENDITURES
24 Share 0 Joint Mortis Irut.ut Plant 51919,0110 915141000 B.MA,00 J,w1,000 I,UI,00 29,A1,00 4,IM,00 M,W.Ooo 24
25 District Collection States Mal.w 115,0e 10.00 Iw,00 100,00 1 fU,00 00,Ow 9U,wd 25
26 0P Patroness 2,1M,00 2,30,00 2,341,00 2,322,0111 2,239,01) i 11,la,00 11.1m.00 M,5w,00 26
27 other Expenditures - D 0 27
i
28 TOTAL EXPENDITURES 1,413,OM 11,9M,00, 10,731,w0 6,U3,00 A,Mo,wO i II,wI,Ow 16,105,00 $8.106.6" 28
........... ........... ........... ........... ----------- ----------- ...........
29 Auerve, L Ca"Y-oeer to Nat Yaa, ❑,IU,Ow. 617811000 (2,214,00) 15107,00 (8,837,00) (B,BM,Ow) (0,340,00) (22,30,01") 0
CAVITY SANITATION DISTRICT A0.1 6117187
STATENEN Of NOJNTM CAN FEAR 90.3
Flout TNAS 190-88 MOON 1996-97
1MY931
LIRE I911-81 1986-89 1909-90 1990-91 IM-93 S-y... TRIAL 1996.97 10-Yur Taut 1111
....... ....... ....... ...... , ._.-_..... -.-.-..-- --_-------
••••INS MR) '
0 Ow,u51 Grry-Mr Few Last Tut 93,00 16,M 11,000 0 1 93.000 0 9S.M 0
..-..--.... _......... ........... .......... .......... , ........... .._....... ----`-----
N set
31 7"Lwy 59,00 55,00 19,000 114'm IT
IT leterwl6 NMellsww.Iwws I'M 5,000 0 0 0 ) 11.00 0 II,ON A0
u other Imse 0 0 AT
........... .......... .......... ...-..__. _.-__... ; `-------- .._.._... ....-...--.
34 TOTAL ROME• &I'M N,ON 0 1 0 ; 125,000 6 1:S.w 34
- ......... ......... .._....-- -`--.�. .---,—`,- : _......... ._..-.__ ..-........
A TOTAL A7AINBLI FIN01I0 01,01 166,00 71,Ow 1 0 01B4O0D 0 SIB,ON A
_..__... ......... ...------— •____.. ........... .......... .`-.......
UMDIMEB
36 lend Yrindipsl 1 Iwerul 71,EO 73,00 71,00 210,M 31B4OO 36
37 Other EWABiwres I 1 37
. . ....... .......... ....... ; ..._.._-• -----_--- .........
N TONE EXPINITNE0 74,00 I1,0O ll.wo 1 0 f 210.m 0 21e,00 IS
........... ........_. .......... .... ..__..._ ; ......._.. ----_----- ..........
39 6New0I Crtry-Wr 10 IN1 Iwr N,No 11,IN 0 0 0 0 0 0 39
60 Pen Ywr•s Ny Period Funding Rw6ir.wets $4. 00 71.00 0 0 0 7 0 0 0 60
......... --......._ .......... _.._..- . ___._ ; .._-----_ _.._----- ..........
CI Pond B.TaO,or (Deficit) 0 0 0 0 0 0 0 0 01
AVNARY
CI Reserves 6 urry-Mr From Last Tear 26.nt.m M,019.0O 9,3O,0D (131,00) (6,397.00) i 3/,759,006 18,IM.O0) 24,759,0O 0
13 TOTAL MENU 7,138,00 5,O1,01A 1.477.00 1,01,00 7,511,00 i 35,181,00 69,961,00 15,690,M 63
........... ........... ........... ........... ........... .--------- ......-.... ...........
CC TOTAL AVAILABLE FUNDIAR 31,691.0E 25,921,0O 15.873.0O 7,951,00 3,136.000 i 0,50,00 II,M.0O 110,469,0O 0
CS TOTAL EXPENDITURES II,011,0O 16,511,00 16,006,00 11,01,00 11,956,M i 61,6I3,000 69,569,00 10,191.00 45
........... .......... ----------- ........... .......... .__------ ----------- --_...----
E6 R.wreas 1 urrs'Olr to lest Ywr N,019,0O 9,M6,O0 (IS3,O0) (4,S97,O0) IB.IM.00) i (8j".0 0) (21.7O,O0) (77,10,00) 16
Cl Most our's Dry Period funding Rewiruwts T,M,ON 2,331,O1 215O1O0 I,99,oN 3,031,1111, 3,431,00 6,93J,O0 61923,0O 61
........... ....._.._ ........... .....--.--- _---—... , ----------- -_...._.. ...........
49 FWD BALANCE M (DEFICIT) 17,169,00 7,069,E0 (3,157,M) (7,386,006) (11.351,O01) i (11,511,00) (16105,00) (34,6O."0) 48
COUNTY SANITATION DISTRICT NO. 2
OF
ORANGE COUNTY
Pt41'TATION
`toV olitan O OAS -
�A.
e a f�49P T'pi
p
Since 195t' .I
og9NGE COUNT
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
COUNTY SANITATION DISTRICT MO. 2 6117/17
BUDGET RECOMMENDATIONS
1987-88 FISCAL YEAR
DISTRICT 12 SUMMM
.._.. .-.«._««... i ___________ ___________ ,
i APPROVED APPROVED RECOMMENDED
DESCRIP110N DA ACCOUNT TIME i BUDGET SUBSET BUDGET
i 1915-16 i 198B87 i i%7-as
REQUIREMENTS
------------
,
, N '
g
Operating i Capital Requiremnts )
r
,
Onratin8 fund i 1/,Ift,ON i 22.464,000 ; 21,113,000 ;
i
AttnulatN Capital Wtti/ Fall i 43,/21,001 i 56,121,000 i 19,8EI,000 :;
Construction fON ) -- ) 19,161,000 ! 37,317,0N
i
Facilities Involving Ford i BI,Ip,OM i I7,2%,%0 ; -20,010,000
--------- s;
M-TOTAL OPERATING { CAPITAL ) 85,476.010 036,601,000 i128,891,nD 1
i ....-_____ i ..--------- i .._....__.. ,
i
Debt Retirement
...... i
load and Internet faN - 1951 1111652 ; I331119 ! %,NO ;
r ,
Good end Internet Fund - 1954 i 1.323,611 i 1.009.216 i 161,617
----------- --------- i ..._-....-_ I
SUBTOTAL RETIREMENT i 1,505,273 i 1,142.935 i 8%,767
70TAL REQUIREMENTS i 16,911,BIG :131,150.935 1129,747,767
FUNDING -- - -
Operating i Capital Funding------
i
Cash { Investigate (appropriated
,. Reserves and Carry-over) ( 65,11I.No ( 71,612,800 :107,956,000
s
Other Revene ! 11,256,110 ( 31.622,000 13,641,000 e!
Anticipated Tax All Kati an i
From It Levy 3,M,0N ( 1.344,000 ; 7,291,000
( .........._ i ........... ...........
SUB-101AL OPERATING I CAPITAL ) 15,176,001 (136.6M.000 :128,09i'm i
i _.._._... ( .......__ ) ........... i
r ,
Debt
Retirement---- ----
i
Cash { IMntilOte (Appropriated ( )
Reserves i Carry-oar) i I,IN,B)3 i 1.0/1,%S i 111,761
Other Reveaee ) 125.4" ( 66.uo ( 451111
i
eo At Raised by Inn for ! .
Dghl obligation
S%-TOTAL DEBT RETIREMENT ( 1.51111,211 i 1,142.955 i 856,767 i
i ""'"------ i ••-------•• i --•-------- i
TOTAL FUNDING i $6,181,273 :fill MISS :129,747,767 i
tAd2usted Tor Inter-Fund transfers
COUNTY SANITATION DISTRICT NO.2 Page I
BUDGET RECOMMENDATIONS 6117/87
1987-80 FISCAL YEAR
FUND 12 OPERATING
....................................... i ----------- 1 ----------- i ----------- i ----------- i -----------
i i ESTIMATED i
APPROVED 1 APPROVED ; ACTUAL ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET i BUDGET EXPENDITURE 1 BUDGET
1985.86 1986-67 1986.17 ; 1987.08
....................................... i ........... i ........... i •---------- i ----------- i ...........
OPERATING
Directors' fees 15,000 15,000 I 12,300 19,000
Contractual SerVltAe
Share of Joint Operating ; 8,241,000 ; 9,604,000 ; 0,167,700 ; ; 10,376,000
Trunk Maintenance 100,000 ; 140,000 I 92,600 ; 152,000
Pump Station Maintenance 100,000 ; 115,000 ; 92,600 ; 115,000
Manhole Repair 50,000 15,000 10,300 15,000
Permit and Ind. Waste Admin. 250,000 240.000 293,100 ; - 300,000
Connection Fee Admin. 38,000 ; 43,000 ; 61,400 ; 43,000
Inter-Dist. Sewer Use Charge ! 2,000 ; 2,000 ; 1,800 2,000
Band Collection Expense 11000 1,000 i 500 A' 1,000
Tax Collection Expense ; 15,000 ; 17,000 ; 16,200p� 19,000
Treasurer's Investment Ado.
6 Banking Fees ; 50,000 ; 49,000 ; 51,600 ; ; 55,000
i i i i i
Utilities 70,000 70,000 46,300 60,000
Professional Services 20,000 10,000 19,100 20,000
Printing And Publication ; 2,000 ; 2,000 ; 600 2,000
Travel 6 Meeting - Directors 2,000 ; 2,000 ; 1,000 ; ; 2,000
UnwlleotiDle Accounts 2,000 ----- i -2,000
----
TOTAL OPERATING 8,958,000 i 10,327,000 i 9,667,100 11,18$,000
i ----------- ----------- i ........... i i --••-.---•-
RON-OPERATING
Interest i 72,000
Expenses Applicable to Prior Years 1,000 1,000 1,000
i ___________ ___________ i ----------- i i """""'
TOTAL NON-OPERATING 1,000 1,000 0 i 73,000
,
----------- i ----------- i ----------- i i ----..-.--.
TOTAL OPERATING 6 NON-OPERATING 8,959,000 1 10,329.000 8,867,100 i 11,256,000
----------- i ----------• i ----------- i i ..-.-.-----
RESERVES
i
Appropriation for contingencies 6,729,000 6,972,000 1,859,000
Authorized General Reserve 5,628,000
--------- = --------- ........
7,000
TOTAL RESERVES ---------- ---------- 0 i ---- ------
TOTAL REQUIREMENTS 20,168.000 22,461,000 8,867,100 21,743,000
COUNTY SANITATION DISTRICT NO.2 Page 2
BUDGET RECOMMENDATIONS 6/17/81
1987-88 FISCAL YEAR
FUND 12 OPERATING
_______________________________________ ___________ i ----------- i ----------- i ----------- , -----------
ESTIMATED ;
APPROVED i APPROVED ; ACTUAL ) ( RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ; BUDGET
1985-96 1986.87 J 1966-87 1987.88
....................................... ........... i -------.... i ---------•• ---------•- i ----.------
AVAILABLE FUNDING
Cash L Investments
(Appropriated Reserves and
Carry-Over) ),10,237,00 ( I1,999,000 1 10,89,010 i i II,7O,100
( ----- ---- ( ---------- ( ------••--• ( i -----------
Fees i 2,O1,400 i 21860,100 i 905,20 i i 1,658,000
i i i i i
Interest 6 Misc. Receipts ; 1,070,00 ( 156,00 ( 1,175,90 790,000
r r r r r
Delinquent Taxes ( 231,000 ( 105,040 ( 201,100 ; ; 225,000
SUBTOTAL i 4,132,000 i 6.121,000 i 2,TIRE,200 '( ) 21665,000
r r i r r
r r i i r
Tax Allocation ) 5,699,040 ) 6,10,00 ; 6,120,700 ( { 7,091,000
r
Redevelopment Agency lax
Pass-Through ( 10,000 i 11,000 ) 13,60 i i 16,000
Subventions ( ",BOB ; 135,00 I68,000 ( ( 186,000
----------- ( ----------- i ----------- ) ( -----------
SUB-TOTAL ; 5,799,000 ; 6,366,000 ( 6,302,70 ( ( 7,291,00
( ----------- r ----------- ( ------•-•-• i i ...........
TOTAL AVAILABLE FUNDING ; 20,160,000 ( 22,464,000 ; 19,062,910 ( ( 21,743.000
COUNTY SANITATION DISTRICT NO.2 Page I
BUDGET RECOMMENDATIONS 6/17/87
1987-88 FISCAL YEAR
FUND 12 ACCUMULATED CAPITAL OUTLAY
_______________________________________ i ----------- i -----------
ESTIMATED
APPROVED APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE BUDGET
1985-86 1906-87 1986-87 1987-89
i
PROJECTS AND EXPENDITURES r
Treatment Plant Expansion ; 9,569.000 ; p
ADDropriation for Raster-Planned
Treatment Plant Facilities 11,516,000 ; 40,796,000 40,835,000
Radio Linked Telemetry System 25,000 ; 25,000 ! 25,000
,
Flow Analysis 6 Metering ! /9,000 ;
i
Replace Fullerton-Brea Interceptor !
Contract 2-25 ; 14,000,000 13,500,000 3,100,000 ; 6,500,000
Liability to Anaheim for So.
Santa Ana River Trunk 100.000 100,000 ; 100,000
i
Joint Works Equity Purchase 964,000
i
i
flow-based Equity Purchase ; 1,328,000 1,411,000 ; 1,410,661
r
Earthquake/Flood Damage Reserve $08.000 570,000 ! 872,000
i
i
Appropriation for District
Facilities Improvements and
Expansion ! 525,000 52S,000 . ; 272,000 951000
i ----------- ----------- i ------•---• i i ---•-_.-_--
SU8-IOTAL 43,420,000 i 56,927,000 i 1,782,661 i i 09,121,000
i --""'---- ----------- ----------- i i ._...-----
COP Payment Transfer to Const.Fund ; 2,510,010
i '...._- --- i """'---- i --------- i i ...........
TOTAL REQUIREMENTS 43,420.000 56,927,000 6,712,661 52,331,010
COUNTY SANITATION DISTRICT NO.2 Page 2
BUDGET RECOMMENDATIONS 6/17/87
1987-80 FISCAL YEAR
FUND 12 ACCUMULATED CAPITAL OUTLAY
_______________________________________ i ----------- i ----------- i ----------- ) ........... ...________
ESTIMATED
APPROVED APPROVED ACTUAL J RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET i EXPENDITURE BUDGET
1905.86 1986-87 1986-87 1987.88
....................................... ........... . ........... . i ........... ,
AVAILABLE FUNDING
i
Cash 6 Investments
(Appropriated Reserves and
Carry-over) ; 35,535,000 ; 44.436,000 41,392,103 ; 4$,418,000
----------- i ----------- ( ----------- i i ...........
Federal and State Grants i 1,942,000 ; 670,000 ) 2,126,000
Joint Works Equity Sale ; 800,000 260,2L2 ; )
Equity Sale to District 14 ) ) 5,300,000 i 5,300,198 i )
Sale of Capacity Rights ) 1,262,000 ) 1,196,000 292,012' ( 1,260,000
Fees ) 1,203,000 ) 1,170,000 370,500 ) ) 675,000
Interest and Misc. Receipts ) ---------- ( --------- i ......... ) ..... ...
SUB-TOTAL ) 7.885,000 12,491.000 9,438,716 ( 61913,000
i ----------- ----------- i ----------- i i ....o....__
TOTAL AVAILABLE FUNDING ) 43,420,000 ( S6,927,000 50,830,819 ( 52,331,000
........... . ........... . ........... . , ...........
i ........... . ........... . ........... . ...........
COUNTY SANITATION DISTRICT MD. 2 6117/07
BUDGET RECOMMENDATIONS
1987-88 FISCAL YEAR
FUND 12 CONSTRUCTION/COP PAYMENT
....................................... i ........... ( ----------- i ...........
ESTIMATED 1
RECOMMENDED 1 ACTUAL 1 RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE i BUDGET EXPEN017URE i BUDGET
1996.97 ) 1996.07 1987-88
....................................... i ----------- ( ----------- ( -----------
PROJECTS AND EXPENDITURES ) ) )
i r r
Treatment Plant Expansion ) 13,409,000 ) 8,900,100 16.750,000
Debt Ifsuance Cost ) 123,000 ) )
Appropriation for District
Facilities Improvements and ) )
Extensions i 22.108,000 i i 16,754,000
SUB-TOTAL ) 35,640.000 8,900,100 33,504,000
( ----------- i ........... ( -----------
COP Installment Payments 4,322,000 ; 1,774,000 i 3,813,000
( ........... ........... ( ...........
TOTAL REQUIREMENTS 139,962,000 ( 10,674,100 ( $7,317,000
AVAILABLE FUNDING ) )
Cash and Investments
(Appropriated Reserves and
Carry-over) 0 ( 31,501,000
( ----------- ) ........... ( -----------
i
Proceeds from Sale of Certificates ;
of Participation ; $9,214,000 i 38,984,00 ;
r r r
Interest 6 Misc. memeiph ) 7/8,000 i 2,620,600 i 2,003,000
, , r
SUB-70TAL ( 39,962,000 41,605,000 i 2,003,000
........... ........... ) ...........
TRANSFERS FOR INSTALLMENT PAYMENTS ) J
..................................
COP Payment Transfer from ACO Fund ; ; ( 2,510,000
........... ) ........... i ...........
COP Payment Transfer from FR Fund ; ; ; 1,303,000
........... ) ........... i ...........
SUB-TOTAL TRANSFERS ) 0 ( 0 ) 3,813,000
........... ........... i ...........
TOTAL AVAILABLE FUNDING 39,962,040 i 41,605,000 ) 37,317,000
COUNTY SANITATION DISTRICT NO.2 Page 1
BUDGET RECOMMENDATIONS 6/17/87
1987.88 FISCAL YEAR
FUND 12 FACILITIES NEVOLVING
............................... i ---------- , -----------
ESTIMATED
APPROVED ; APPROVED ACTUAL ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET ; EXPENDITURE ; BUDGET
1905-96 1986-87 1986-07 1981-08
i
PROJECTS AND EXPENDITURES
GrbOn Canyon Oae PIS Modification 10,000 29,291
� , r
i
South River Trunk Extension 210,000 240,000
East Richfield Interceptor ; ; 300,000 ; 31,000 ; ; 3M,001
Euclid Relief Trunk Serer 5,710,000
i
r
Fairview-Nest Interceptor Sever 2-23 ; 5,671,000 ; 3,516,000
Carbon Canyon Sever Extension $00,000 �; 7,000,000 ! '
,
,
Capacity Exchanges-Dist 11 6,557,D00 '
i r
Euclid Interceptor Suer 2-26 30,000 19,010,008
,
Taft Interceptor Sear 2.6-2 2,50D,000 1,000,000 1,032
Naxhape-Placentia Relief Sear 500,000
Batavia/Lintels Trunk Relief 600,000
Bolsa Serer Relief ; 400,000 �
, a
S.A.A.1. Relief ; ; 7,000,000
i i i a
Appropriation for District
Facilities Improvements and
Extensions 700,000 ; 700,000 61,000 700,000
,
SUBTOTAL 21,81111,000 17,256,000 152,326 i ; 20,010,000
----------- i ----------- i ---------- i i --_____-___
COP Paytent Transfer to Const. Fund ; 1,303,SOD
i ----------- ----------- i ---------- i i ---- ------
TOTAL REQUIREMENTS i 21,880,000 ; 17,256,000 152.326 21,313,000
COUNTY SANITATIOM DISTRICT NO.2 Page 2
BUDGET RECOMMENDATIONS 6117/07
I987-08 FISCAL YEAR
FUND 12 FACILITIES REVOLVING
................................... , ----------- ----------- , ----------- , ----------- , ____--_-___
ESfIXATEO
APFWYED ; APPROVED ACTUAL ; RECOMMENDED
DESCRIPTION OR AccUl1T TITLE IGNORE 1 BUDGET ! EXPENDITURE BUDGET
i 1985-86 i 1986-97 ; 1986-87 ; ; 1987-00
__ .................................. , ----------- ----------- ----------- i ----------
AVAILABLE FUNDING ;
,
Cash B Investments
(Appropriated Reserves and
Carry-over) 19,649,000 ( 15,207,000 116,029,681 ( ( 19,250,000
----------- r ----------- - ----_----_ , , ----____.._
Connection Fees ) 750,000 ; B50,000 ; 1,227,073 ; 850,000
Interest 6 Misc. Receipts ; 1,609,000 ; 1,199,000 ; 1,325,000 ; ; 1.213,000
r ----------- - ----------- - ----------- - , -_______._.
TOTAL AVAILABLE FUNDING ) 21.80,000 i 17,256.00 i 10.582,554 i i 21,313,000
COUNTY SANITAIION DISTRICT NO.2
BUDGET RECONNENOATIONS 6/17187
1987-88 FISCAL YEAR
FUND 12 BOND AND INTEREST - 1951
....................................... i ----------- ----------- i ----------- i -----^---•• -----------
i i ESTINATED
APPROVED i APPROVED ; ACTUAL ( RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE ; BUDGET ( BUDGET ERFENDITURE ; ( BUDGET
1985-86 1586-07 ( 1996.07 ( i 1987.88
....................................... i ----------- i ----------- i ........... ........... i --•--------
BOND RETIREMENT AND INTEREST I
............................
Principal an Bonds 65,000 65,000 ; 65,000 ; ; 65,000
Interest on Bonds ; 3,937 ; 2,813 ; 2,156 ( i 1,688
� ........... � ........... � ........... ( ( .....----.-
TOTAL ( 68,937 i 67,813 ( 47,156 ( 66,68E
AUTHORIZED GENERAL RESERVE 132,715 i 05,906 ( ( 68,392
( ........... ( ........... ...........
TOTAL REQUIREMENTS l81,6S2 i 133,719 ( ( i 9S,080
AVAILABLE FUNDING i
.................
Cash 6 Investments
(Appropriated Reserves and ;
carry-over) ( 168,652 127,719 ( 129.322 ; 90,080
i ..........: ........... ........... ( i ------ ----
Interest 6 Misc. Receipts ( 13,000 i 6,000 ; 7,295 i i 5,000
........... i ........... ( ........... ( -----------
SUB-TOTAL ( 13,000 i 6.000 ) 7.295 i i 5,000
........... ........... ( ........... ( -----------
70TAL AVAILABLE FUNDING 191,652 I33,719 ) 136,60 ) 95,D80
Outstanding G.O. Bonds 8 6150187: $90,000
Final Payment Date: August, 1988
COUNTY SANITATION DISTRICT NO.2
BUDGET RECOMMENDATIONS 6/17/87
1987-88 FISCAL YEAR
FUND M I= ARM INTEREST - 1958
----------------------------------- ___________ ___________ , ----------- , ----------- , ___________
ESTIMATED ;
APPROVED , APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET (.EXPENDITURE ; BUDGET
1995-86 1986-87 19%-97 1%7.88
,
BOND RETIREMENT AND INTEREST
---_________________________
PrixiDal on Bonds ; 300,000 ; 700,000 ; 700,000 JS0,0%
Interest on Bonds ------ ; 13,E-0 -
; ----- ; -- --
TOTAL
i 321,000 313,500 109,750 356,000
AUTHORIZED GENERAL RESERVE 1,002,621 695.716 ; 005,697
----------- ----------- i i i -----•---_-
TOTAL REQUIREMENTS i 1,323,621 i 1,119,216 i i i 761,687
AVAILABLE FUNDING
_________________
CasO 6 Investments
(Appropriated Reserves and
Carry-auer) i 1,211.621 i N9,216 i 159,441 i i 121,687
( ----------- ( ---------- i ----------- i i "'-"""-
Interest B Misc. Receipts 112,000 ( 60,000 ) 67,1% ; 40,000
----------- ----------- i -------•--- i i -----•-----
SUB-TOTAL ) 112,10D ( 60.M ; 67,696 ) ( 11,180
_------- i ----------- i ---------- i i ---------•-
TOTAL AVAILABLE FUNDING I,M3,621 1,009,216 ( 1,026,%G ) ) 761,687
........... . ........... . ........... . , ...........
Outstanding G.O. Bands B 6/30/87: $700,ANN
Final Payment Date: January, 1989
CNgT SANITATION DISTRICT 80.7 WII/tl
SCXEMIll OF DISTRICT COLLECTION SISTER ONECTS
PROJECT gam C.I.P. 1917-118 1988-59 1999-90 1110.91 I99I-9! 1"" IMYM
Andio Li.Md Tolnetry In) B.m 1 M,No
Fullerton-1ru inleraptsr
Cantn[t 245(1) w) 10,015,000 1 3,512,m 6,000,000 NO.M
liability ts Anaaeb for
ENDED Santa as liver(runt (a) IO,Ma i IO,OOD
DEW hall Project, (a) SIS,OO i 75,m 75,000 75,000 Eli'm Is.m 75,NO 75,00
. -- ---- 1 _.—..._. ----._._ ----------- ---_-.-_ ----..-.... ..._...... ._...-. .. ....
Sub-total AO fund 10,162,a0o 5,SI5,000 6,MO,Mo 575,00 - 75,0N 75.000 15,00 B,M 75,M0
SOuta River Frank Ontonagon(3) (C) 240.0111) i ho,OO
Eh1 RiMfinld lntertapbr 7.N(f) (1) 31e,000 ( N,MO "am IOD,oN
S.A.R.I.Radial (3) (c) 7,ND,ON 1 I 7,OM,OM
RaMCe-Planotia Solid hr1,a (3) (Of ],ND,O" j 500,000 2,000,000 1,00,000
Euclid lot enNow,Smr 7-76 12) (b) 2S,100,000 ; I00,000 4,ODO,000 e,000,000 4,000,m 1,000,Oo 4.000.000 1,00,ON
Rolling THU 9obtrud Relief (3)(n) 300,000 { 300,000
Bolo Sae,NOTION (3) (C) 400,000 OO,No
latalw/Lincoln Truk Mlbl(3) (1) No,No j T Ng. M '
Taft Intercepts,Sm,2Y-1(7) (1) 3,018,OIE i 1,518,40IE I,SO,ON
Mr Sall Projects(a) MR,CO i IOO,DO IN,OM IM,MO 1O,m 10.00 SOLDIER IO,OM
----------- ---------- ----_---- ---------- ----------- ---------- _....,.-
hb-wlal M food 31,932,O8 i 1,6/7,10 1,300,014) 4.m. O C,m.m 6,IO,OO 5,10L0O e,M0,M 1,5O,00
--------.— .......... ....__... ..—.._._ -..------- ------.--- -------...
Mtsr Itlmtia Plant (C) ID,IOo.OM i 10o,m IO,m,m
. -.---_.-. 0 •.__-._- ----------- ---_.-.--- ._-.-._.. ---------- ._------— .._..._ -._._...
N,69e,00) i 5,316,008 10,606,040 I4,115,000 4,915,001 6,ITS,NO 51I1S,010 4,675.000 I,Srs'm
(a)folly Funded 1. hster-planad WISH.pmally under Onatnitia
M Partially fuNed 7. eater-,baed facilities preantly under dais
(1)Not Funhd 3. Raster-ptaonnd facilities se50dded for town OsMWanstratia
EMIT aMiIAl1AR DISTRICT 90. 2 61111n
SVATEMI Of PROJECTED CARS FEAR cape I
rim YEM3 1901-%IMOIKR 1196.91
1902-931
LIRE 1901-M 19AR-M 1919.90 1190-91 1%1-92 5-Yea, load 1996-91 -10-Yur Total LIRE
---- -.—... ....... ....... .___ --_ ---------- --.------
M1MT11A MA
............. ,
1 Anew"A Ca"rm' Inn net fur 11,181,000 10.487.000 B,SI3,OOo S'M. E 2,335,E0 11.181,0E (2,MS,M) 111181,000 1
........... _......... ... ...... ........... -------- i ----------- .-.-------- ....._..-.
RUMS
2 Man of It la Atlantic. 1,S16,OOD 8,622,000 9,M9,Ea 11,313,0E 13,0I0,EO I E,3M,OA0 1001055,000 ISO.iss' 0 2.'
3 Mec 1,6%' M 1,13110110 I,W,OM 1,911,0E 2,07,OM i 9.121,000 11.612,0E 20,163,0E 3
1 ran r..I A Nos ellaeaou 1. 190,E0 616,401) SIS,Mo 290,0E 0 2,211,000 0 2.2111000 6
5 Other Auange 0 0 5
........... ........... .......... ........... ........ ........... -------_. ...........
6 701%REVENT 9,956,0E 11,011,000 12,222,000 13,546,0E 15,017,00 i 61.112,0E 1111691,000 173,469.00 6
_......... ........... ----- ------.-.— _......... ----------- .-.-.-.-_. .-.........
I TOTAL AVAILABLE MIAG 21,143,0E 21,518.00 M,195,010 19,151,0E 11,352,0E i 73.559,0E. 189.362,00A 182,921,00 i
........... ........... ........... ........... .........— .-_---.--: ....--.._ .--------
EM%DIMES
9 She,..1 Joint Works A A 0 10.316.8E 11,933,011) 13,I13,011 IS,181,000 18,146,001 i 69,911,000 lu'va' E 21018111000 8
9 collection B%lec A A O al arm,(par. IM,OM 1,012,0M 1,162,000 1,338,000 I.SM,ODO I 5,951,E0 11.935,0E 17,86B.M 9
IC Other EuaEitaree 1 0 1 0. ID
.......... ......... .......... .........— -------__ I ........... -------- .........
11 TOFM["MIT= 11,256,0E 12,915,0E 11.897,000 11,119,0E 19,601,E1 1 15,1%,000 1521005.60D MATTIE4 11
__..._.. ........... ........... ........... ...---- : _-------- ------..._ . .-........
12 Mserec,6 Carry-Our to Mel Year 10,601,00 8,513,0E 5,9E,020 2,315,000 (2,545,0E) 1 (2,315,E0) (43,6/3,0001 163,163,0M) 12
13 Real Wr's Cry Period Ranging ReOaireaents 5,621,000 6,/13,000 1,666,000 B,%O,EO 9,811.0E i 9,811,00 19,823,OE'. 19,M3,oho 13
__._.. .--_.-_-._ ___--_.... ........... --------- i .-.----.— ;, ...........
11 EARN BaM.nt Or 1Mficit) 1,859,E0 2,10,0E (1,336,000) (6.225,000) (12,119,000) I (12.179,000) (0,266,010) 163,266,OM) 11
CAPITAL MIS)
IS Moore.,6 Carry-ceu FIG.Last Year %,169,OM 15,021,OM 35,1%,000 9,515,000 13,fY,000) !' 96,1691000 (II,SA,000) %,169,000 IS
_......... --------- ---------. --.......-- ______ , ------------ ---------
tuna
16 Mutruction$,Art, 2,126.0E 165,0E 0,149,0E 2,I119,000 2,189.0E 10,956,000 163,0E 11.423.00 16
IJ 1..: Cnmuction iic.OE BE,OE BM,OE BM,OM 156,00 /,250,010 1,250,0E B,SE,MO Il
18 CEng, 654,0E 1119,000 111,0E 181,00 BM.OE I 3,729,000 1,156,0E 8,685,M0 IB
19 Raw Of Capacity Rights 1,260.0E 231,0E 216.0E 3,516,E0 122,000 5,310,600 %I,ER S,909,E0 19
M hunt A A1ue11aneE5 Max 6,%B,MO 3,922,000 1,6E,E0 Rogow 0 11.M3,OM 0 11.01110011 90
21 blur-Mn6 Frannie, 11,E0 11,Eo II.EC 21
22 01%, uncee 0 0 22
_.-.-._. ........... ........... ........... .._.--__ i .-._...-.. ----------- ...........
% MEAL REVIEW 10,990,0E 6,2u.w 6,203,0E 1,185,0E 1,581.0E 36,202,000 I0,E2,M0 $6,231,000 21
........... ........... ........... .......... ---------- ----------- .-----..-- ...........
2e 107AL AVAILABLE MISS 107,140,00 81,215,00A 11,%gOM 11,149,000 913,0E i 132,311,0E (615031001 112,60,000 21
........... ........... ........... ........... .......... ----------- ----------- ..---------
UMDIME5
IT share of Joint Worts Ireatrut Plant 16,150,0E %,6E,oE 23,210,M II,OE,OE 5.549,000 I M,M0,E0 13,501,00) 96,161,Ma 25
% District Collectly,SpM 10,600,000 11,115.00 1,915,E0 6,115,0E S,115,0E I 42,240.00 12,250,0E 56,490,0E 26
21 UP Myrent6 3,013,M 1,161,0E 1,149.Ma 1,165,M0 1,121,MC i N,162,E0 20,059,0E 10,501,E0 21
2B OEM, Elowilulec %I,M 961,000 9%,EO AR
........... ........... ........... ........... ........-- i ----------- ._..----.— ...........
29 TOTAL EMMDITMES 32,121,0E 1S,569,E0 A,351,00 21,108,000 15,118,E0 i 116,906,0E 15,816,0E 192,122,E0 29
--'........ ........... ........... ........... ........... I ----------- ----------- ...........
30 MM,eas A carry-Oro, 10 Rat Year 75,021.00 35,I06,000 9,555,0E (3,640,0E) 111,535,0E) (11,535.E0) 156,319.000E IE13191E01 E
=TV W17ATION DISTRICT NO. 7 6d11d01
ST47MENT Of M ECIu WN FLa Fa9r 1
FISAL YEARS 1981-U THRUM 1996-97
199L-931
LIKE 1911-89 1988-19 ABU." 1910-11 1991•92 I S-YW IOU] ICU-97 10-leer Total LINE
-- ------- ------- ------- --�.. .._....-_ -----------
BUD FRED($) I
............ I ,
31 Uterus 1 brry-Door frw btl Year 01I,00 04,00 0 :0 0 I 12,Om '0 8I1,a0 U
----------- ----------- .......... »------ ------»-•- -----------
UYENUE
11 To bey 0 d 31
a Iduast S Kieaelbomw Imoea 65,Oa U,aO 0 0 0 1 44,00, 0 ",No 33
U Other I.. 0 JE
__......- ---_»_ ...-...-... ._...... ....-...... � r...-�. ........... -----------
is TOTAL ALBEKU 65,Oa 19,000 0 0 0 U:UO 0 64,000 SS
U TOTAL AVAILABLE FLUIDS 137,001 »•6/S.W •-�•-0 --_0 _-_ 0 ;i BMW •-•_•--.0 816,00 36
Enuolmis
r
n bad Frlmi9al A Inbrast Ia,Oa 3"'Ow 300,000 802,000 U
1B bdr-lead Taster 10,000 a '.� 74,0" 7e,00 38
U Otbr Emarditurn ( 39
........ .........» ...........
w TOTAL EUER011UAES 60,0a 673,Oa 0 0 0 i 176,M 0 816,Ow e0
11 burrs A Carry-Our to Next year 650,a0 0 0 0 0 i 0 0 0 11
61 RM Year's On briN Fun01a0 balrsants /64,010 0 0 0 0 I - 0 0 0 61
........... ..._..... ........... -----__• ...... ) ...._--_ .._..._-- ------..---
13 FORD blame or (Deficit) 0 0 0 0 1 I 0 0 0 13
masesee... ........nee eanenuna ... ....m....a i nnnn... assnnrer ..--..-....
$MY (Adjmla for labr-FuM WANT...
64 basrs3 A urry-Door iba last Ynr Ia,161,a0 05,962,00 64,719,014 15,663,040 11,1I3,Oa) i 101,761,040 (16,170.00) 1011,161.00) 66
15 TOTAL REVENUE 21,910,040 17,304.040 11,60S,000 01.731.a0 19,691,041) I M,a1,a0 I2I,1M,00 219,767,000 45
........... ........... ........... ........... ........... I .»...---.- ----------- --..-..-...
16 TOTAL AVAILAILE FUDINS 179,148,0411 101,366,00 67,700,000 37,194,000 11,266,000 i 3a,La,aO 101,W,00 3a,u5.0a 66
17 TOTAL EXPENDITURES E3,116,141) 9.997.00 61,111,0114 U,S11,a1 35,I35,U0 ( 203.671,000 198,a1,0a 67Z,397,Oa el
----------- -----..... ----------- ........... .......».. I .»...----- ----------- -_--------
el Downs 1 OSry-Orer b Next Ten 13,963,000 66,279,000 15,163,a0 (I,IIS,aO) (16,070.00) i (13,170,00) (95,763,101) (93,762,00) 61
69 Ant YAWS Or,Period I ndib b9uireaeaas 6,02,041) 4,473,00 1,0/E,000 8,30,000 9,846,041) i 9,116.00 19,113,a0 19,U3,Oa 61
........... ........... ........... ........... --------- I ---._----- ----..-..» ...........
9 FUND BRAKE UR(DEFICIT) n.M,a0 31,1a,0a 0.019,00 (9.03,0411) (211.71/,10) i (26,714,00) (113,SU,00) (IIu,SU,ae) 0
COUNTY SANITATION DISTRICT NO. 3
OF
ORANGE COUNTY
C tAITATIOA,
_�� e`to4olitan OrcOOIST'P
P
O �
J
Since 1951, .�
0."gNGE COVN�
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
COUNTY SANITATION DISTRICT NO.3 6j17j87
BUDGET RECOMMENDATIONS
1987-BB FISCAL YEAR
DISTRICT 13 SUUMARY
_______________________________________ I ........... i ----------- ........... ,
i AIMET '.. i APPROVED i AFENOFO i
DESCRIPTION OR AMOUNT TITLE IUOGET ( IUOGFT BET
9UDG9NG
97-89
REQUIREMENTSOperat
......j.. 6 Capital Rewirwente
Operating Fun ; 17,411,000 ; 18,322.000 ; 19,985,004 !
Accumulated Capital Outlay Fund ; 42,914,000 ; $5,10,000 1 69,799,000 t
,
Construction Fund ; ; 43.281.000 42,GAS.000 ;
facilities Revolving fund ( ,0M ( U,6FO,M0 t1
...... ----------
ON-70TRL OPERATING f CAPITA i 72,025,000 1130.040.00 1125,507,000 1
i ----------- ----------- i .--__-____- ,
Debt Rotireeenl
---------------
Band an Interest Fund - 1951 f 1951 ....... t:
....... .......
TOTAL REQUIREMENTS 1 72,911,581 1130,695,140 1126,153,266 1
FUNDING Operating f Capital Funding
G+M1 i Investments (Appropriated
NmuerrlA an Carry-Over) 33,101,000 ( 63,799,000 :102,906,W0 ;
Other Rwamue ; 11,617,000 ; 59.190,000 ; 12,926,000 t
Mtlefprin To Allocation
From lA levy, ( 7,610.000 0,051.000 9,177,000
MS-IOTA OPERATING f CAPITA 72,328,000 :130,048,000 1125,007,000 1
i _____----- i ----------- i ...........
...l Mtiressent
........
,
Cash Investments (Appropriated
Reserve 6 Carry-Ovsr) ; STO,S18 ; 139.140 89,216
Other Revenue ( 16,000 8,000 7,000 �
i
Aeount Raised by taxes for
Debt Obligation ! 0 ! Soo,000 1,030,000
........... ........... i ...........
SUB-T07AL DEBT RETIREMENT 616,519 641,110 1.146,264
,
TOTAL FUMDIM6 12,946,589 :130,695,140 1126,193,244 1
:Adjusted for Inter-Fund Transfers
COUNTY SANITATION DISTRICT NO.3 Pave I
BUDGET RECOMMENDATIONS 6117/81
1987•88 FISCAL YEAR
FUND 13 OPERATING
--------------------------------------- ----------- i ----------- i ----------- ----------- -_______.__
' ESTIMATED
i
APPROVED APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE BUDGET
1985-06 1196-87 1986-07 1907-8B
,
i
OPEAATIX6
Director's Fees 20.000 20,000 19,800 25,000
� r
Contractual Services �
Share of Joint Operating ; 0,814,000 ; 10,151,000 8,437.500 ! ; 10,903,000
Trunk Maintenance 165,000 ; 170,000 ; 130,188 ; ; 170,000
Upstream Odor Control ; 90,000 72,018 90,000
Manholo Repair 100,000 ; 170,OOD 132,900 ; 155,000
Pulp Station Maintenance ; 110,000 ; 130.000 ; 57,694 ; 175,000
Permit and Ind. Waste Retain. 148.000 148,000 86,600 100,000
Connection Fee Admin. ; 28,000 ; 3D,000 ; 31,300 ; 30,000
Inter-Dist. Sever Use Charge 4,000 ; 4,000 ; 700 1,000
Band Collection Expense ; 11000 ; 1,000 ; 900 ; 1,000
Tax Collection Expense ; 19,000 ; 22,000 ; 21,000 23,700
Treasurer's Investment Ada. ;
6 Banking Fees 40,000 35,000 ; 44,600 ; 50,000
r i
i
Utilities 120,000 I55,000 ; 131,300 150,000
Professional Services 20,000 ; 10,000 ; 15,100 ; ; 20,000
i
Printing And Publication ; 1,500 ; 1,500 ; 100 1,300
Travel 6 meeting - Directors ; 1,500 2,000 ; 1,200 2,000
i
Uncollect i0le Accounts ----- ------ ; ; ----
TOTAL OPERATING --------- ---------- --------- ----------
NON-OPERATING
,
, i r
interest 65,000 111,100 102,000
Expenses Applicable to Prior Years 2,000 2,000 J 2.000
,
TOTAL NON-OPERATING
TOTAL OPERATING 1 NOW-OPERATING 9,596,000 11,208,000 ; 9,354,000 12,003,000
....__ ---- ----------- - ----------- , r -----------
RESERVES
Appropriation for Contingencies g � 3,017,100 1,510,000 1,980,000
Authorized General Reserve 002,000
--------- --------- - -------
TOTAL RESERVES ; 7.815,000 7,114,000 0 7,992,000
i ----------- - ----------- i -------- i i -----------
TOTAL REQUIREMENTS 17,41I,000 18,322.000 9,3S4,000 19.985,000
COUNTY SANITATION DISTRICT NO.3 Page 2
BUDGET RECOMMENDATIONS 6/17/87
1907-80 FISCAL YEAR
FUND 13 OPERATING
....................................... ( ----------- ----------- ----------- ----------- i _________--
i i ESTIMATED '
( APPROVED APPROVED ACTUAL ( RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE ( BUDGET ( BUDGET 1 EXPENDITURE ; BUDGET
( 1905-86 i 1986-81 , 1986-91 1987-BB
AVAILABLE FUNDING
---______________
Cash 6 Investments
(Appropriated Reserves and
Carry-Over) ; 7,204,000 ; 8,164,000 ( 7,247,053 ; ; 8,741,000
---------•- i ----------- i ----------- i i -----------
Foss ( 1,552,400 ; 1,096,000 ; 034,100 ( ) 1,190,000
i i i i i
Interest 6 Misc. Receipts ( 7/9,000 512,000 ( 603,900 593,000
Delinquent Taxes 0
( ------- ------- ------- ; ( ------
SUB-TOTAL ( 2,597,000 ; 2,107,000 1 1,774,300 { ( 2,067,000
----------- i ----------- i ----------- i -----------
Tax Allocation ; 7.492,000 ( 7,795,000 ) 7.927,100 ; 9.043,000
SUBTOTAL 7,610,000 ( 8.051,000 ) 9,143,300 i 9,177,000
-•-•------- i ----------- i ------••--- i { ...........
TOTAL AVAILABLE FUNDING 17,411,000 ( 18,322,000 ( 17,166,653 i 19,983,000
COUNTY SANITATION DISTRICT HO.3 Page 1
BUDGET RECOMMENDATIONS 6117/87
1981-BB FISCAL YEAR
FUND 13 ACCUMULATED CAPITAL OUTLAY
______________________________ _ __________• i ___________ r
ESTIMATED ;
APPROVED ; APPROVED ACTUAL ; gfcmLwFD
DESCRIPTION OR ACCOUNT TITLE ; BUDGET BUDGET ; EXPENDITURE { ; MET
1965-96 ; 1996-87 ; 1996•07 { ; 19B7-81
___________________________•-__ -----------r --------___ r ----------- { ----------- i -------- { -----------
.. ....S AND EXPENDITURES { {
r r
r r
r , r
Treatment Plant Expansion { 10,231,010 { i { { 0
{ r r
Master Plan/Elk Update { { 125,000
i
Appropriation for Master-Planned
Treatment Plant Facilities { 16,911,010 { 11,521,000 ; { ; 39,0/7,000
Reimburse Other CSD's for Seal Beach
Blvd. Pump Station Equity { 85,000 { BS,000 { { { 85,000
Radio Linked Telemetry System 25,000 { 25,000 { { { 25,000
Local Agency Manhole
Reimbursement Program { 400,000 ; { IS3,111 ; { 23,000
{ {
Nestside Relief Trunk Aecon. ; 220,000 {
Knott Interceptor ; 100,000
Los Alamitos Trench Reconstruction ; 51,000
i r {
Miller-Holder Manhole Vault
Replacement 2.100.00 { 1,500,000 228,000 7,50,010
{ { {
Joint Narks Equity Purchase ; { 2,115,000 �; 1,801,255 ; { 1135010011
{ {
Floe-based Equity Purchase ; I,77I,000 ; 2,492,000 ', 2,/91,168 { {
Earthquake/Flood Damage Reserve ; 329,000 { 611,000 ' '
936,000
Appropriation for District { { { {
Facilities Improvements and
Expansion ; 700.M { 7001000 ; 55,ROD ; ; 70D.W
{ ----------- i ----------- r ----------- i ---.--.--__
SUB-TOTAL { --------- ; ---------- = ---------- ; ---------
Transfer to Bond Fund ; 303,000 { 500,000 ; {
,
wP Payment Iransfar to Const. Fund { 2.606,000
--------
r ,
r ,
TOTAL REQUIREMENTS 13,211,001 55,110,000 5,229,037 r{ { { i { 51,I85,000
COUNTY SANITATION DISTRICT NO.3 Page 2
BUDGET RECOMMENDATIONS 6/17/87
1987-88 FISCAL YEAR
FUND 13 ACCUMULATED CAPITAL OUTLAY
_______________________________________ ___________ _ ___________ _ ___________ _ ___________ _ ___________
' ESTIMATED ;
� APPROVED ; APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET ; EXPENDITURE ; BUDGET
1905-86 , 1986-87 ; 1986-87 1987.88
AVAILABLE FUNDING ;
,
Cash k Investments
(Appropriated Reserves and
Carry-over) ; 35,637,000 ; 43,660,000 38,678,706 ; 44,910,000
----------- , ----------- , ----------- , , -----------
Joint Works Equity Sale 118,000
I I
Equity Sale to District 14 ) 5,520,000 5,520,104
Federal and State Grants 2,017,000 ) 726,000 2,284,000
Fees 680,000 i 456,000 ; 341;200 495,000
Sale of Capacity Rights 1,296,000 i 1,296,000 ; 189,648 ; 1,354,000
Interest and Misc. Receipts ) 3,439,000 3,460,000 ) 2,936,B44 2,942,000
----------- i ----------- i """""' i i -_.________
SUB-TOTAL ; 7,610,000 ) 11,458,000 ; 8,993,796 ; ; 1,07S,000
___________ ___________ ) ----------- i ----_______
' Transfer from Bond Fund ; ; ) ; 500,000
----------- i ----------- ----------- i i _____-_____
TOTAL AVAILABLE FUNDING 43,247,000 55,118,000 ; 47,672,502 ; ; 52,485,000
COUNTY SANITATION DISTRICT NO. 3 6/17/87
BUDGET RECOMMENDATIONS
1987-08 FISCAL YEAR
FUND IS CONSTRUCTION/COP PAYMENT
....................................... i ----------- i ----------- i ...........
I ESTIMATED
RECOMMENDED ACTUAL 1 RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE 1 BUDGET i EXPENDITURE BUDGET
1986-87 1906.87 i 1987.89
....................................... 1 ----------- i ........... i -----------
PROJECTS AND EXPENDITURES 1
.........................
Treatment Plant Expansion ; 14,524,000 9,523,200 1 17,990,000
Debt Issuance Cost 133,000 ; I
i I
Appropriation for District
Facilities improvements and ;
Extensions i 23,940,000 1 19,962,000
i
SUB-70TAL 138,605,000 i 9,523,200 I37,952.000
----------- i ----------- i ...........
COP Installment Payments 1 4,681,000 ; 1,922,200 ; 4,131,000
----------- i ----------- -----------
TOTAL REQUIREMENTS 1 43,286.000 i II,115,100 42,083.000
i
AVAILABLE FUNDING
Cash and Investments
(Appropriated Reserves and
Carry-over) 0 i ; 35,62$,000
........... I ---------- ( ...........
Proceeds from Sale of Certificates I i
of Participation 42,476,000 ; 42,240,500
Interest 6 Him. Receipts ; 910,000 ; 2,BI1,100 ; 2,317,000
SU1-TO7AL I43,286,000 I45,082,200 2,327,000
i ........... i ........... ...........
TRANSFERS FOR INSTALLMENT PAYMENTS ) 1
..................................
COP Payment Transfer from AID fund ; i ; 2,686,000
COP Payment Transfer from TO Fund 1 ; -1,445,000
--------
SUB-TOTAL TRANSFERS 1 0 i 0 i 4,131,000
----------- i ----------- i ...........
TOTAL AVAILABLE FUNDING 1 43,286,000 459082,200 42,003,000
COUNTY SANITATION DISTRICT HO.3 Pop 1
BUDGET RECOMMENDATIONS 6/11187
1907.88 FISCAL YEAR
FUND 13 FACILITIES REVOLVING
....................................... i ----------- , ----------- ---------- i ---------- , ---________
ESTIMATED
APPROVED APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET ! ESPERDITUAE 1 BUDGET
195-66 1966-87 ; 1986.07 J ; 1907-88
.............................. ........ i ----------- i ----------- -""""-- i ----------- i -----------
PROJECTS AND EXPENDITURES l
,
Artesi+ Branch Sub-Trunk Relief 200,100 200,000 300,000
r r i
Miller Holder Relief { ; 1,700,000 ; ; 2,000,000
r r i i
Imperial Relief Interceptor i 160,000 500,000 500,000
Orange Western Sub-Trunk Relief
Sewer 3-25 521,000 500,000 29,000 500,000
,
Parallel LaeDeOn Branch
Hoover-Western 125,000 ISD,000 200,000
r r
Hoover-Western Sub-Trunk Relief
on Trask 375,000 ; 400,000 ; 400,000
i
Laepson Interceptor Sewer 3-2/-2 ; 315,000 ; 3I0,000 ; 27,000 ; ; 350,000
r
r
La Habra Purchase Relief 1,800,000 ; 2,000,000 ; ; 2,000,000
i
Capacity Exchange-Gist t and It 1,/09,000 ;
r
i
Magnolia Interceptor, Reach 30 70/,000
r r i
Magnolia Relief Sewer ; ; B01,110
Las Alamitos Sub-Trunk Relief 2,000,000 3,200,000 5,201,001
, r ,
Remove Hazard Ave. Sulfide
Control Station 35,000
r i r
i
Appropriation for District
i
Facilities Improvements and
Extensions 730,100 i 3,S62,000 ; 3,390,000
,
SUB-TOTALS 11,674,00 13,122,000 56,000 ; 13,640,000
----------- i ----------- ---•------- i ----- -----
COP Payment Transfer to Coast. Fund ; ; ; ; 1,445,No
i ........... i ---•------- ----------- i i -----------
TOTAL REQUIREMENTS 11.670,000 13,322.000 ; 56,000 ; 1510851000
COUNTY SANITATION DISTRICT NO.3 File 2
BUDGET AECONNEROATIONS 6/17/07
1987-88 FISCAL YEAR
FUND 13 FACILITIES REVOLVING
...................................... i -------"" i ""----"' i -"""'- i """"""-
ESTIMATED
APPROVED APPROVED ACTUAL RECOAMEIDEO
DESCRIPTION OR ACCOUNT TITLE ; BUDGET BUDGET ; EXPENDITURE ; IUOKE
1905-06 1906-07 1986-01 i 19/7-81
,
AVAILABLE FUNDING
Cash 6 Investeents
- (Appropriated Reserves and
Carry-over) ; 10,260,000 ; 11,975,000 ; 12.075,013 ; ; 13,621,001
----------- i ----------- - ----------- -----------
Connection Fees 550,000 600,000 625,000 ; ; . 610,101
Interest 6 Misc. Receipts ) ------- 70 0
,000 ; ------- ) ------
SUB-TOTAL ) 1,410,000 1,341,000 1,622,200 ) ) 1,457,010
' ----------- ----------- , -----------
TOTAL AVAILABLE FUNDING { 11,670,000 13,322,000 13,697,213 ) ) 15,085,001
COUNTY SANITATION DISTRICT NO.3
8UO8E7 RECONNENOATIONS 6/17/81
1917.88 FISCAL YEAR
FUND 13 BONO AND INTEREST - 1951 6 1950
....................................... ( ........... ( ----------• i ----------- ( ........... i ---..------
i ESTIMATED
APPROVED APPROVED ACTUAL ( 1 RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET ) BUDGET EXPENDITURE ) BUDGET
I 1905.86 1986.87 ) 1986.87 ( ( 1987.88
....................................... ( ........... ( ........... ........... i ----------- ( ...........
BOND RETIREMENT AND INTEREST )
_______________
Principal on Bands ) 533,000 i 335,000 ) 535,000 ; i 535.no
i i i i i
Interest on Bands 61,976 22,038 11,009 ( 12,610
( ........... ) ........... ........... i i ---- ------
SU8-TOTAL ) 576,976 557,038 552,009 ) 547,414
........... ) ........... ( :::::x::::: i i ----- -----
Transfer to ACO Fund $00,000
AUTHORIZED GENERAL RESERVE ....... 90---- ) -------
TOTAL REQUIREMENTS 919,588 ( 647,840 ) ) 1,146,264
.. ......... :.........
AVAILABLE FUNDING
__.....-._..
Lash 6 Investments
(Appropriated Reserves and
Carry-aver) 570,588 ( 139.040 ( 129.193 ( ) 89,266
( ........... i ----------- i ........... ( ( ...........
Interest 6 Misc. Receipts ( 66,000 i 8,000 ( 7,501 ( { 7,000
........... ( ........... i ---•----•-- i i -- ---..---
SUB-TOTAL ( 66.000 ( 8,000 ) 7,581 ( ( 7,000
( ....a...... ) ........... ( ........... i i -.-..------
AMOUNT TO BE RAISED BY TAXES ( ( 500,000 ) ( ) 1,050'"0
........... ( ........... i ----------- i i -----------
TRANSFER FROM PTO FUND ( 303.000 ) ( 500,000
........... ( ----------- ( ........... ( ( ...........
TOTAL AVAILABLE FUNDING ( 919,518 i 641,840 ( 635,774 ( ( 1,146,266
:t:z . ::::....... i ........... i , ......
Outstanding G.O. Bonds 1 6/30/81: 11,139,000
Final Payment Date: 1951 - August, 1990
1958 - January, 1989
COUNTY SANIIRTION DISTRICT AM 6111187
SCHEDULE Of DISTRICT MLLEOJIDN SISTER PROJECTS
PROJECT TOTAL C.I.A. 1987-90 11OB-89 1989-90 1990-91 1991-92 199I-91 1993-91
........... ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
Radio Linked Telemetry (A) 25,000 1 25,000
Basta[ AlanfEIR Update (A) 125,000 75,000 s0,o00
W.W.Other CSR's far Seal
Beach Blvd. PIS Equity (a) 85,000 65.000 '
Biller Holder Bacteria Vault
Replacement (I) (A) 8.185,000 1,283.00 2,50,000 2,000,000 1.000.000 1.000.000 1,00,000
Biwellabous Projects (A) ia,0w Iw,000 100,000 100,000 100,000 100.000 10,0o0 100,000
........... 1 ---- ----------- ----------- ----------- ----------- ----------- -----------
Sub-tptal AIR Bond 9,718,M0 ) 1,283,000 2,785,000 2,150,000 1,100,000 1.100,000 1,100,000 lo0,000 IOo,n,
........... 1 ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
Artesia Branch Sub-Trunk Relief (3) (a) 300.000 ) Soo'c"
Biller Bolder Relief (3) (e) 2,000.000 I'doo."O soo,000
leperial Relief Interceptor (3) (A) 90,000 s00,000
Osnpe-Yestern Sub-trunk Relief
Beeer 3-25(2) la) 529,000 29,000 "O'C00
Parallel Lasn9oc Branch
Bawer-YBStnA (3) (a) MO,Coo 20,00
"..'-western Sub-lrunk
Anklet on Trask (3) (al 400'"0 ; 400.000
Leaned, Interceptor Seen 3O4-2 (2) (a) 377'"0 27,000 150,o"
"'RAPTI.Relief Saner (3) (a) 8". 00 SUDA 0
lee Alaeltas Sub-trunk Witt (3) la) 1,20,000 3,200,000
La Habra Purchase Relief (3) (a) 2,0",Ooo 2,000,000
Biscellacemua Projects 1,1 700,000 ; I"'No 160,000 100.0W 100.000 100,000 100.000 loo,OW
----------- ----------- ----------- ----------- ----------- ----------- ----------
Sub-total IS fund 11,o06,ow 56,000 ]",00o 100,000 1,4s0,00n 2,e00,000 4.000.00 100,0" 600,00o
----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
BOARD 70TAL 20.124.000 ; 1,339,000 2,905,000 2,250,00 4,550,000 1,100,000 5.900,000 m,ow 500,0o0
(a) Fully funded 1. Rastar-planned Facilities presently under construction
(b)Partially Fund" 2. Basler-planned fadlitio,presently uMe, design
(e)Net FAMed S. BRter-plaMad facilities 500.1"Adr FAT... da5i9n1[OdeMY[lla,
COUNTY SANITATION DISTRICT 10. 3 U171M
STATGENT OF PRUECM4 CAM FM - DATA,1
FISCAL YEARS 1987-M THROWN 1996.91
NM-931
LINE IWl-Be 1Md9 ION-M 199091 I99I-12 5-YMr TOTAL 1996-91 IO-YMr IDEAL LIRE
OVERATIXS MD
I Reserves L GrrY'DYer floe Last fur 61111,M0 I,M.MO 6,M .M0 6,IW,M1 I,M.m 5 1711.M0 12,9M,OM) 1,111.001 1
_......... ._...._. ------_— --------- .__._._ , --------_. ............ �..'.....
REVERY[
2 Share of 13 Las Allocation 9,161,M0 M,U3,M1 12.0M,M0 IS.M.M1 IS.2g101 i M,M.MO 110,IN.MO 111.192,00) 2
3 Ines 1.190.014 1.2W,M0 1.312.M0 1.373-000 I,IY,IM 6,516.4011 B,3W,M0 11.968,000 3
1 interest t Xiuellanears loneee 591.000 511,M1 M,M 205.00 B i 1.107,4140 0 Id011M0 1
5 Other R.... 0 0 5
.._..._.. ........... .......... ........... ......_._ • ----------- -•__•__•__._ ............
6 TOTAL 1MMUE 11,211,001 12,/50.000 13,122,010 15,128.11111 16.112.M0 i 69,2N.M 119,231.0011 I16.161,0D 6
..__..... ........... ........... _......... ...------ . , ----------- ............ -------_--
3 TOTAL MAILMLE FUNDING 19,MS,M M,/12.000 U.M.M1 19,541,010 IB.MI,MO i 77,9117.00 116,216,M0 191,2M.OM 1
........... ........... .........— ........... -------- ) ..--------- ..........._ ............
INMMITMM
B Same of Joint WAS X f D 10,M.M0 12.SM.MO 11.119,M1 W,M.OM 19,BM,M1 7 /3,513,M0 IM.oic'm 2LI,SM,M 1
9 Collection SMtn N 1 U and Other CAR, I.IM.MO 1120,IM I,IW,MI 11673,4110 I,1241M1 i 1,111,011) 11,922,000 M.A9,OM 9
i 10 Other leveedlluran 1 0 0 10
........... ........... ........... ........... ._...__... 1 --------- ----------- ....._..._
11 IOTA ENIMIIMES 12.013,001 11,101,0110 IS.MI,IM 11,25.040 M.M,MO ; 0,9si'm I12,912.0110 2U.M2.010 11
........... ........... .__..._ ........... ..._.__ 1 _--------- ...-------- ------------
12 Referees I Grr,-der W Next Year 719112.0400 6,6M,OM 1,156,IM_ 1,M, M 12.M.M1) i 12.M.M01 146,61,110111) (16,6U,MIf 12
is Next Town Dry Varied Funding Rapiresants 6,002,M0 6,102,1140 1,M,M0 9,IM,MO 10,4U,M1 i 11.I9F.M4 21,1W,M0 21,IM.M1 13
.__.__ ........._ ___-- ----------- ---__.. 1 .._._.._ ---........ .._......_
11 FYed GLrce Or I Valiciq I.SM,MO (214,610) 13,0I.M1) (7.119.000) 113./54.1001 i (13.150.000) If1,M.M01 (61,0.OM) 11
CAPITAL /M0(3)
---------------
15 Raselws AGrrY-over Free Last Yee, 91,10.000 N.IW.110 W,M,1M 22,2M.M0 11.2M.M1 i N.M.MI M.MO 9,11113,000 15
......... ........... ........... -------- , ..... — ----_----- ._........
-
REVENM
16 constructim Grants 2,2111.000 IN.MO 2,995,000 2.M.OM 2,MS.IM i 11,1M,M0 199,0110 12.261,00 16
11 fees: COmectm 6M,OM 60,00 600.M0 ORION) 600,OM 1 3.9M.DM 3,000.000 61M0.000 13
IB Other 495.00 520.OM 516,000 573,000 602,OM ( 2.Ik,000 3,191,OOD 61222,DW IS
19 Rate of Geetlty Rights 1,351.000 251,00 212,M0 3.820.00 ISt.MO I 5.18B4O00 603,000 61M.000 19
N Interest C XisOel laeeees Intone 6.1161000 11SU.MO 2,510,0011 1,213.000 43B4OM 14.134.00 0 14.134.000 20
21 IOler-foM lunefar WO,MO SM,M 500.000 21
22 Other Irceee 0 0 22
__....... ._...._.. ._._ _........ ____.. ) ..—...... ............ ............
23 TOTAL REVENUE ll.M.M1 6,/51.010 6.9,11.01111 9.MLM I,1M,M0 5 31,126,0110 1,Wl,MO 46,319.00 23
........... ......._.. ..._.._. _.._...-- ---------- ( ----------- ------- ------------
21 IDEAL AVAILMLE FOWIXR I0,5i3.M0 85,615.001 51,IM.M 31.N3.OM 16.130,M0 ( III.M.MO 1,M.OM 10,482.000. 2e
........... ........... ........... ........... ......... , _.-------- ---_------ ------_-----
EXPENDITURES
------------
25 TWO OI Seat Ruts lreataenl Plant ❑,M.MO 11.626.000 24. W,M1 11.8117.011 S,M.MO : M.122.OM 11,506.00 103.928,000 25
26 District Calleetiw SPOT" 2.1115.0M 2.M.MD I,SW,MO ;114.M1 5.9M.M0 i II,MS.MO 100.00m, 19,385,000 26
21 CM eased 1,131.OM 4,101.000 I.W9.M0 1,512.M1 I,IM,MI : 22.111,000 21.131,004 13,88L000 22
N Other Evendit"ne 1,3M,Oe0 MI,OM 2,M,M0 2.232.000 28
........... ........... ........_. .......... ...___ 1 ----------- ............ ... ........
N TOTAL UNDERWRITE M,364,M 35,3631M0 U19BIM0 19,IN,MO 16.W. M I3i,M6,M 36,90,0M I69,126,011 N
........... ........... ........... ........... ----------- ------------ ----------—
AO Reserves C C....... W Reel Isar N,19.M W.M.MO 22.M.M0 11,M.MO M3,OM i 103.OM 129.911.M01 I21,9MA011 M
COUNTY SANITATION DISTRICT M. 3 6I11/A
STATEMENT OF PROJECTED GSA FLAY Opp 2
FISCAL YEARS 1997-88 INROUSN 1996-97
Seems/
LINE 1987-80 190-89 IM-ds IM•91 1991.92 HART tow 1996.91 WORRY total LINE
.... ....... ....... ....... ....... ....... ............ ._.-._-... ------------- ----
BOND FUNNIE)
...-.-.----. 1
JI Rmme A Gary-Over Fro Lost For 09,000 99,1ma0 p.M SAM 0 1 /9,no 0 89,000 JI
........... .......... ........... ........... .......... 1 ........... ............ ------------
BEVENUE
32 lax away I.450.001 W3,W0 1 11515,4W 1,553,Gds 32
SJ Inleml a Niuellpoos June 7.000 6,000 4,000 1.000 0 i Film 0 18.000 33
3e other lone 0 3e
......... ......... .......... .__•-._- _...__.. 1 ........... ............ -----------
35 TOTAL RWEM 1,0S7.m 309.M e,NO IAW 1 i 1,Stri'm 0 1,571,000 a5
.......... ......_.. _.._-.._ ........... ......... ; ........... .......... .......__
36 TOTAL AVAILABLE MARINE 1,116,0W EW,ON W.NO 35,OW 0 11664,00 0 1.660,M A
.......... ......... ........... .......--- , .._-._.-.- ......... ...........
EXPENDITURES
37 Bond Principal B Interest Se1,N0 512.m 36,ON 35,000 0 i I,IW,WD I,Ids,NO 37
A later-IPAd Transfer SOI,ON s o,WO SN,ON 30
19 Other Ependitum 0 0 39
.......... .......... ........... ........... ........... ..-
i - .-.-.-. ........_. ......-__
10 TOTAL EXPENDITURES I,N1,00 592,m solids 35.000 0 116601040 0 1,60,000 CO
......... ........... ........... .......... .......... ) --------_ ........... ............
11 Reserves B CvrpOwr ta Next YUT 99,WD Balm Belied 0 0 I 0 0 0 /1
12 Neel Year's Are Period Feadiag Aenlroots 99•00 66.W0 3e,00 0 0 1 0 0 0 12
........... ........... ........... .......... ........... ............ ............
11 PoM 0atann Or IWlidll 0 0 0 0 0 i 0 0 0 13
x::::s:e:x x:::::::-:: :z::::::-:: :-::::::::: ::::z�:::z: ::�::::::: ::�:::::::: -•--- -••:
SURNDA! (Pdp3lW for loler-FWd inulers)
u ANnr..F A Ca,,,Mr Fro Last YWT 102,993,00 B1,239,ON 56,926,0E0 26,152,000 13,293.M i 102,V93,OW (21550,M) 102.913,000 ee
15 TOTAL REVENUE 23.10.00 19,396.00 20,649.000 24.330.00 21,e18.100 1 109,533,00 126,824.000 236.357,W0 45
........... ........... ........... ........... ........... i -..-.----- ------------ -- -----.-.-
16 IOTA AV41LOLC FUNDING 126.153,0110 106.M.000 17,595,010 51.012,00 34,711.00 1 212,526.M 121,211,00) A9,350,00 16
47 TOTAL EXPENDITURES 39.911,M 19,749,000 54,Ie3,010 11,7119,4101) 37,321,00 i 215,074,000 199,BB2.OW ele,M,M 17
............ ........... ........... ........... ........... 1 ........... ............ ............
10 hear,o A CRT"., o Next Ypar 87.239.00 S6,M,Ods 26,752,010111 I3.293,000 (2,550.MI 1 12.5W.001 (75,6418.001) (75.M.M) eB
19 Next Year's Dry Period foodip Re9uiruenls 6.101,000 6.M.ND 7,911,M 91I21.040 N,197.M 10.497.00 21,136,M 21,1311,000 19
........... ........... .......... .......... ----------- ........... ............ ............
50 FUND BALANCE W (DEFICIT) 811131101) 19.958.000 18.761.W0 e,165.N0 (13,047,M) i (IJ,W1,Ods) 196,716.0001 196.7161000) N
COUNTY SANITATION DISTRICT NO. 5
OF
ORANGE COUNTY
�P1yITAT10N
`to4olitan GIs
�'e ,a nr�nO9e T'Pi/�
V O N K `�
0
Since 1954 .�
0�9NGE CO
UNS
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
CO3'6FY SANI7RrION DISTRICT No. s
MET RECOMMENDATIONS 6/11/87
1987-80 FISCAL YEAR
DISTRICT 15 SUNNY
_________________
APPROVED ] APPROVED RECOMMENDED !
DESCRIPTION ON ACC0111I TITLE APPROVED
BUDGET BUDGET
j 19q- -
...... -- ---- --
REQUIREMENTS
Operating A Capital Repleeuets i
i
1 1
Operating Food j 3^000 ( 5,01/,000 j 5,737,001
AtQUQUtatM-Capital Outlay Fund 10,671,000 ; IS,111,000 ; 10,9QU,000 ;
Fuili[Uf Revolving land 1,013,000 1,062,000 1,6q,QU0
!
SUB-10tAt OPERATING A CAPITAL 15,562,000 21,200,000 I1,311,000 j
i ----------- i ----------- -""-___-_ i
.... ..Bremen.
I I I
, I I
I
Bond and Interest Fund - 1951 i 45.ANN i 51,235 54,011
i ----------- i ___________ i ___________ j
TOTAL REQUIREMENTS 15,601,060 21.331,235 18,312,011
FUNDING
i
Operating 1 Capital funding
I I I
Cash A Investments (Appropriated
Reserves and tarry-Over) 9,396,000 ( 13,381,000 12,601,000
i
Other Revenue ! 1,165,001 ( 5,080,000 ,' 3,546,000
Anticipated lax Allocation
free LR Levy ! 1,101,001 ! 2,011,000 2,181,000
i ----------- i ----------- ----------- -
SUB-TOTAL OPERATING A CAPITAL 15,562.00 ( 11,280,000 18,328.000
Debt ent
..........
Cash A Investments (Appropriated
Reserves A Carry-Over) 24,3QU ( 24,817 ! 29,623
I
Other Revenue ( 3,000 ( 2,OQU ) 1.000 (
i
Amount Raised by loxes for (
Debt Obligation 11,760 i 21,501 ! 22,318
"""""" i ""'------ i __-._-__--- i
SUBTOTAL DEST RETIREMENT 45.060 i SL,235 ( 34,011 ;
TOTAL FUNDING ( is,"I,060 i 21,331,23S 11.352,011
sAdjusted for later-FuW Tramhra
COUNTY SANITATION DISTRICT N0.5 Page I
BUDGET RECOMMENDATIONS 6117/81
1987-88 FISCAL YEAR
FUND IS OPERATING
_______________________________________ _ ___________ ___________ _ ___________ ___________ ___________
ESTIMATED
' APPROVED ; APPROVED ACTUAL RECOMMENDED
DESCRIPTION 00. ACCOUNT TITLE ; BUDGET BUDGET ; EXPENDITURE ; ; BUDGET
IM-86 ; 1986.87 19B6-07 ; 1987-88
,
r 1
OPERATING
I
Directors' Fees 5,000 ; 5,000 3,800 ; 6,500
i I 1 1
i
Contractual Services
Share of Joint Operating ' 1,387,000"; 1,555,000 ; 1,414,100 ; 1,808,000
Trunk Maintenance 100,000 75,000 32,300 75,000
Pulp Station Maintenance ; 200,000 1 250.000 ; 201.662 ; 250,000
Permit and Ind.Maste Admin. 20,000 ; 20,000 13,20D ; 15.000
Connection Fee Admin. ; 19,000 19,000 17,200 37,800
Bond Collection Expense 100 ; 100 Too ; ; 100
Taxifee Collection Expense ; 4,900 5,200 ; 4,300 ; 7,500
Treasurer's Investment Ads. ;
6 Banking Fees 6,000 ; 5,700 ; B,30o ; ; 10,000
1
Utilities 98,000 77,000 ; 71,800 i ; 80,000
User Fee Expense ; 10,000 i 9,000 ! ; 6,500
1 ' 1
Professional Services ; 10,000 10,000 I5,200 ; ; 20,000
;
1
Printing And Publication ; 1,250 1,250 100 ! ; 1,000
1
Travel 6 Meeting - Directors ; 250 ; 250 ; 200 ; ; 300
Uncollectible Accounts ' 1,500 1,500 1 11.50
i ; -----
TOTAL OPERATING 1,853,000 2,035,000 I,191,262 ; ; 2,319,000
i ___________ I ----------- i ----------- ; ; -----------
NON-OPERATING
1 1
-------------
1 i I 1
Interest 23,000 ; 15,000 ; 15,8B9 ; ; 13,000
1 I
Expenses Applicable to Prior Years ----- ----- -----; ; ;
1
1
TOTAL NON-OPERAIING 26,000 ; 18,000 ; 15,9B9 ; ; 16,000
- 1 - - I -- 1 1
TOTAL OPERATING 6 NON-OPERATING ; 1,079,000 2,053,000 ; 1,807,151 ; ; 2,335,D00
i ----------- - ----------- i ----------- i ; ---__------
RESERVES
Appropriation for Contingencies 1,059,000 ; 1,961,000 ; ; ; 2,231,000
Authorized General Reserve 910,000 11427.000 ; ; ; 1,168,000
i ----------- - ----------- i ----------- ; ; -----------
TOTAL RESERVES 1,999,000 ; 2'"1'000 ; 0 ; ; 3,402,000
----------- - ----------- - ----------- i i ---- ------
TOTAL REQUIREMENTS ; 3,870,000 ; 5,011,000 1,807,151 ; ; 6,737,000
COUNTY SANITATION DISTRICT NO.5 Page 2
BUDGET RECOMMENDATIONS 6/17187
1997-88 FISCAL YEAR
FUND 15 OPERATING
....................................... } •---""""' i ----------- i ----------- i -------- i _•_--------
i } ESTIMATED
APPROVED } APPROVED ACTUAL ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET i EXPENDITURE } BUDGET
1985-86 } 19B6-87 ; 1986-87 ; 1901-80
....................................... i ........... i ------•---- } ----------- } ""'"'---•- i ...........
AVAILABLE FUNDING } } }
---_-__-__-____
Cash 6 Investments
(Appropriated Reserve and
Carry-Over) ; 1,781,000 2,093,000 ; 2,072,989 } ; 3,220,000
i ----------- ----------- , ----------- r i -----._____
Fees } 24,000 47,000 31,500 } 31,000
Supplemental User Fees ; 128,000 661,000 ; 501,000 }
Interest 6 Misc. Receipts } I09,000 ; I00,000 212,300 235,000
Delinquent Taxes ------ 67,000------ ------ }
, i r , r
iax Allocation i 1,671,000 . 1,919,000 1,791,900 2,139,000
} i i
Subventions 27,000 } 62,000 } 49,500 } 42,000
i ----------- , ----------- , ----------- , , --.--"""
SUBTOTAL } 1,701,000 i 2,011,000 } 1,811,400 } 2,181,000
i -------•--• i -••---•---- i •---------- ) i ------•----
T07AL AVAILABLE FUNDING 3,072,000 i 5,011,000 4,803,089 } 5,737,000
i ........... i ........... . ........... . , ...........
COUNTY SANITRTIOR DISTRICT N0.5 Page 1
BUDGET RECOMMENDATIONS 6111/87
19137-88 FISCAL YEAR
FUND 15 ACCUMULATED CAPITAL OUTLAY
_______________________________________ ----------- ----------- i ___________ i ----------- i ___________
ESTIMATED
APPROVED APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET ; BUDGET EXPENDITURE BUDGET
1985-86 1986-87 1986-81 1987-80
,
PROJECTS AND EXPENDITURES ;
-------------------------
Treatment Plant Expansion 1,610,000 ; 2,533,000 ; 1,643,000 ; 2,969,000
Appropriation for Raster-Planned
Treatment Plant Facilities ; 1,371,000 ; 3,535.000 ; 1,415,000
Radio Linked Telemetry System 50,0of 50,000 ; ; 50,000
flax Analysis 6 Metering 35,000
i
Raster Plan/fIR Update 10,000
i i i i i
Bay Bridge Pump Station Improvements ; 500,000 600,000 i ; ; 600,000
Slip Line toast Huy Farce Main
Rocky Pt. PIS to Dover Dr. ; 650,000 1,000,000
Rehabilitate Lida and PCN Farce Mains,
Lido fares Main to Valve '0' 5-26 ; 650,000 850,000 ; 628.000 ; 200,000
'R' St., Ilth St. and Lido Pump
Station Improvements ; 200.000 ; 200,000 ; 40,000 ; ; 310,000
Bitter Point Pump Station Upgrade ; ; ; 56,OOD ; 62,000
Coast trunk force Mains:
S.A. River to Bitter Paint
Pump Station • Phase If 5.19-112 ; 168,000
Bitter Point PIS to
Newport Blvd. 5.19-RS 950.000 1.150,000 596,000 203,000
i
S.A. River to Rocky Point ; 2,250,000 ; 2,100,000
i
Newport Blvd. to Back Bay 5-29 i i ; ; i 2,208,000
8ayside Drive Trunk Sewer ; ; 1,10,000 ; ; ; 1,700,000
Rehabilitate Balboa Peninsula
Trunk, Lido PIS to 'A' St. ; 1,300.000 ; 1,300,000 393 ; 500,000
Rocky Paint PIS Upgrade ; ; ; ; 66,000-
i i
Joint Equity Yorks Purchase 235,000
,
Earthquake/Flood Damage Reserve 52,000 i 108.000 155,400
Appropriation for District Facilities
Improvements and Expansion 350,000 ; 350,000 ; 77,000 ; 350,000
r ----------- , ----------- , ----------- , , .........
TOTAL REQUIREMENTS 10,671,000 15,174,000 3,040,393 10,90B4O00
COUNTY SANITATION DISTRICT NO.$ Rage 2
BUDGET RECOMMENDATIONS 6117117
1917.88 FISCAL YEAR
FUND 15 ACCUMULATED CAPITAL OUTLAY
_______________________________________ ---------- ----------- i ----------- i ----------- ___-----_—
ESTIMATED
APPROVED APPROVED ACTUAL ; RECOMMENDED
DESCRIPTION OR ACCOUNT TIRE BUDGET BUDGET ; EXFENOITURE ; BUDGET
1985-86 1906-87 1986-87 ( 1987-0
,
AVAILABLE FUNDING
Cash 6 Investments ;
(Appropriated Reserves and
i
Carry-over) ; 0,000
--------- ---------- --------- ; --- ------
federal and State Grants ; 327,000 ; 126,000 317,000
Joint Works Equity Sala 75,000 ! 280,273 ; 425,000
i
Equity Sale to District ld , 1,000,000 999,569
Flow-Based Equity Adjustment ; 1.010,000 2,398,000 2,398,123
Sale of Capacity Rights 280,000 226,000 36,136 ; 223,000
,
Fees ( 51000 ! 5,000 ; 3,400 ; ; 665,000
i , r
Supplemental User Fees 626,000
i i i i i
Interest 6 Misc. Receipts ( 629,0111) 102,00 170,16- - ------; ( 0
SUB-TOTAL ( 3,615, 2,258.00
-- i 0,532,--- -------- � i ---------
TOTAL AVAILABLE FUNDING ; I0,671,101 15,174,000 13,257,096 ; 10,901,000
COUNTY SANITATION DISTRICT NO.5
BUDGET RECOMMENDATIONS 6/17/07
1907-BB FISCAL YEAR
FUND 15 FACILITIES REVOLVING
----•---------------------------------- i ----------- 1 ----------- i ----------- ( ----------- I -----------
I I i ESTIMATED
I APPROVED I APPROVED i ACTUAL I ( RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE I BUDGET i BUDGET i EXPENDITURE i I BUDGET
I 1905-06 i 1986.87 ( 1906-67 ( I 1907.68
....................................... I ----------- I ----------- I ----------- I ........... I ...........
PROJECTS AND EXPENDITURES
......................... 1 1 1 1 1
1 1 r 1 1
1 1 1 1 1
Bayside Drive Trunk Seger I I 420,000 i ( i 1,052,000
1 1 1 1
Cameo Shores Pump Station and I ( ( I
Extension of City Sever to State Park I 400,000 i i ( 300,000
1
Reimbursement Agreements Payable ; 210,000 ; 61,000 ; 61,356 i ( 156,000
1 1 1 1
- Appropriation for District Facilities I ( I
Improvements and Extensions and
Future Reimbursement Agreement
Payments ; 143,000 175,000 I ( i 175,000
I ----------- ----------- I ----------- I I ...........
TOTAL REQUIREMENTS i 1.013,000 1,062.000 i 67,356 I I 1.683,000'
......... ...... :........ .....
AVAILABLE FUNDING
1
Cash 6 Investments
(Appropriated Reserves and
Carry-over) ( 629.000 ; 654,000 I 649,202 ; ; 731,000
----------- I ----------- I ----------- I I -----------
1 1 1 I 1
1 1 1 1
Connection Fees I 371,000 I 371,000 ; 343,000 ; ( 136,000
1 1 1 1 1
Advance in Aid of Construction i I ( i 150,000
Interest 6 Misc. Receipts I 13,000 I 37,000 I S2,100 I i 46,000
I ........... ( ----------- I ----------- I ( ...........
SUB-TOTAL I 304,000 i 408,000 I $95,100 I I 952,000
( ----------- I ----------- I ----------- I I ...........
TOTAL AVAILABLE FUNDING I I,013,000 I '1,062,000 i 1,066,302 I I 1,683,000
*Outstanding Agreement:
Irvine Co. 1109,689 . For Bayside Drive Trunk Oversieing at
Promolory Point, repayment free
connection fees do not commence until
the Bayside Drive Trunk is completed
to the southerly city boundary
(estimated after 1980)
Irvine Co. 161,463)
Dann 1s,538) For Back Bay Trunk Sever
JM Peters 108,759)
1285,7N0
COUNTY SANITATION DISTRICT HO.5
BUDGET RECOMMENDATIONS 6/17/87
1907-88 FISCAL YEAR
FUND IS BOND AND INTEREST - 1951
______________________ ___________ _ ___________ _ ___________ 1 -----------
ESTIMATED
I APPROVED ; APPROVED ; ACTUAL ; ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ; BUDS IT
I 1985.86 1986-81 I 19A6-87 1987-88
r
_______________________________________ r ----------- i ----------- ----------- i ----------- r _____---___
r
BOND RETIREMENT AND INTEREST
r r
r r
Principal on Bonds 20,000 I 20.000 I 20,000 ; 20,000
i
Interest on Bonds ; ----- ; 2,115 2,365 I ----- I I
TOTAL 23,46S i 22.915 i 22,666 i i 221365
r i I
AUTHORIZED GENERAL RESERVE 21,59S ; 20,320 ; ; I 31,666
----------- r ----------- , , ------ ----
TOTAL REQUIREMENTS I 05,060 ; 51.235 ; I 54,611
,
AVAILABLE FUNDING I I I
_________________
Cash 6 Investments
i
(Appropriated Reserves and
Carry-overl ; 26,300 ; 26,867 ; 24,658 1 29,623
___________ ___________ i ----------- r i _-______---
r �
Interest 6 Xisc. Receipts ; 31000 ; 2,000 ; I I 2,000-----
SUBTOTAL 31000 2,000 1,282 I 2.00
AMOUNT 10 BE RAISED BY TAXES ; 17,760 24,381 ; 17,115 ; I 22,.TBB
___________ ___________ ___________ I ___--------
TOTAL AVAILABLE FUHOING 45.060 I 51.235 I 63,05S I ; S6,011
Outstanding G.O. Bonds 0 6130/87: 896.000
Final Payment Date: August, 1990
COUNTY SANITATION DISTRICT MO.S 1111107
SOLME OF DISTRICT COILEC"OM SY51EM MOILCTS
PRWICT TOTAL O.I.P. 1911-00 1910-29 1919-90 1990-11 199142 1992-93 1993-94
........... ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
Radio linked TAle.etry(a) SD,w0 W,OW
roster PI.P/EIR met. la) N.No I 25,C00 15.000
Cost Trunk force Maim:
1. Biller Point Nap Station
to Mmmrl 614. 5-I91-3 I(,)t 1.223,00 940,000 213,003
2. Mwporl Slid. to Back Bey 5-29 (3) (a)a 2,220,020 I 12.000 208,00 I,aW.W0 110001000
3. Sant,on,if war to Bitter Point
Nap $real. (3) We 2,W0,W0 I 300,000 1,W0,W0 l,Wa,as,
a. Risky Pont to Mupert Also.
ls.utA side) (1) left 1310.000 310,000 1,200,000
Relub. Lido fora Min and WM Fora Main
(If& Fora Main to Vale. V) 5-26 11) (A) 1.187.000 1 987,4W 200,004
-A' St., late St., and lido Me
gulf., Imrawienls(2) (A) 353,OW I 43,000 260,000 50,000
Relu0ililsie 8a1Dw Noinmla Trunk,
Lida Nap to-A-Street (3) (a) No.oN i 150.00 2W,000 10,06
May India pus,Staff..I.P.../leer. (3) la) 601,000 1 50,W0 W0.0W W,OW
Bitter Point No RAW..Madrid. (I) (a), 62.000 I 62.040
!.,side Drive Truck Mmer (3) (A) 1,200,000 I,WQ000 2w,OW
Ready Point Nip Station Upgrade(3) (a)t 66,000 ! 66,Wo
Miecellamous Projects le) 350,000 Sired 50,000 w,Wo W,OW %,00a W,oW W.aW
----------- I ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
ArO-total am fund 12,161.000 1,912.000 1,354.400 2,415,000 2,650.400 1.100.000 1,050,000 360,And 1.250,000
----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
!,,aide Drive T...A Arab, (3) (of 2.100,1101 IN.0" ljor,ow 200,00
U.Stores puts Station and Armenian
of City asset to Stale Park(31 (a) Wo,Wo 15a,00 1W,OW
Eblensien of Coast Trans, Carona Del Nor
MR St.. to Crystal me. Nap SIR. (C) 1,100,00 i IOO,WO I,Oa0,W0
Crystal Wye Nap Staff..(3) (1) 400,OW 10o,0W
Extension of South Coast Trunk free Crystal
mw Point Ste. to Arula Mel Due. (a) SOO,OW I 500,100
MisOellaMm3 irejecl, I.) 175,000 25.00 25,000 25.000 25,00 2S,OW 25,00 25,aw
So-total IR$am 4,575,00 0 1151M 21S.00 1182510W 325.00 1,425,00 525,OO 25,000
----------- I ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
GRAND TOTAL 16,136.00 I 1.182.00 1,S29,000 2,690. W 4,415,000 1.425,0a0 2,47S,Ow 885.0m 1,225,03
let Fully Funded 1. M,Sler.p3aMed facilities presently under COm{,ActiO.
(0) Pa IWI, Funded 2. rose.-pl+ane0 facilities presently under design
(C)Not funded 3. Nosrer-planned facilities scRAdAIAd for tutu..desiSNmmtrucri.n
e .arbour mid by 0istria h.6
OMIY MUTATION DISTRICT No. 1 6111017
STATEMY OF IMIECIM CAN FEW Page 1
FISCAL Y MS 107-11 TOM IM-97
IM-931
LINE 1111-AI INl-0 19M-90 IM-91 1991.92 $-Year Total IM-97 10-you foul TEST
. ---- ------- ------- ------' -_---. ...-... i ............ --------,- ............ ----
MEARrIM FORD
.............. 1
I Reserm d Derry-Over 1.last Isar 3,20,00 3,102,00 3,639,OM 3.946,00 4.347.00 3,20,001) 4,872,M0 S,220,M I
.--"---.. .........-. .......... ........... ........... 1 ........... ---------- ...........
REVENUE
2 Mrs Of It has Allaealc 2,261,00 2,632,00 3,081.01 3,607,00 4,223,00D i 15.791,M 34.7u.00 50,574.000 2
3 fen SL,OM M,MO 37.00 M,00 61,00 I 10,00 241,00 121,000 3
6 Interest 1 Ninallanon muse 235,0M 250,M 269,01 20,04E Sly'no 1.3%,No 2,/25,040 3,0'w 6
5 Other Rene 0 0 5
.......... ........... ........... ........... ........... I ----------- ........... ...........
6 TOTAL SEVENDE 2.517.00 2,910,M0 3,387,00 3.940,00 I,591.00 17,M.0N 37,M,w 5411511000 6
.--...---. _......._- .......... ----------- ----------- I ----------- ----------- ------.----
7 TOTAL AVAILABLE FUNDING 5,731.N0 6,320,M 7,/%.O0 7,06,10 9,931.00 0.573,1110 42.271,00 $7,911.00 1
........... ........... .......... .......... -•--------- i ----------- ----------- ---------.
E20ESDIIMM
1 SMre of Joint Acres N 6 0 1,10,00 2.079.00 2,391,00E 2.750,100 3,I62.00 ! 12,110,1011 %,Shl,NO U'lu,N0 1
9 Collection 5%tax 01 0 s0 other Open $21,w N2,01 d0,01 i0,N0 904,00 1 3,511,10 61971,000 10.415,00 9
10 Other EopWiturn 0 0 10
........... ........... ........... ........... ....--.--- i ------'---- ----------- -----------
11 TOTAL ENOMDIIMM 2,3%,00 2,611,w 3,M,w 3.S0,w e,N6,N0 i 15,101.00 31.R1,N0 61,222,0D 11
........... .......--- -.. .......... ........... ( ........... ........... ...........
12 Reserves 1 Carry-Over to Next Year 3,402.00 1,639,00 3,946,009 1,30,00 4,372,000 6,072,00E 10,169,00 10,119,ON 12
13 Rest FARE't Cry Period IRANN heNinsentt 1,111,0E I,34I,000 1,50,001, 1.710,00 2.033,00 TIMMS 6.09,ON 4,089,00 13
........... ........... ........... .......... .."------ 1 ----------- ---------- -_--------
IL Tom le0ne er (Deficit) 2,M.M 2,20,00 2,/06,0011 2.517,100 2,M.00 i 2,839,1011 6.facom 6,660,00 16
CAPITAL INSIST
-------------_ ,
15 Retelen 1 Carry-nor frn last our 9,381,000 1,931,40 4,056,00 (1,90,N0) (1.423,000 i 1,R1,00 90 0 12, ,ON) 91311I,00 15
........... ........... ........"- ........... ----------- i _----__•- ---------- -----------
REVERSE
16 Contraction Guet$ 377,ND 12,0E 696,00 6%,NO 06,000 ! 1,961,0E M,w 2,025,000 16
It Faro: Connntin 756,00 1,696,00 11291.00 I.ril,w 1,Dol'oo i 6,123,0E 6,655,0N 12,510,w 17
11 Other %5,00 710,0E 143,000 1f3,N0 M,000 I 3,m.w 3,00,00 7.511.00 IB
19 felt of Capacity Ri9Ate R3,N0 42,000 33,000 w.600 22,000 1 9%,00 ",Goo 1,051100 19
0 J.U.St 6 Nixellencus Is.ae 616,N0 439,00 N,000 O 0 I 1,163.w 0 1,163.w 0
21 Other Iewe $75,000 2,050,M SHIM 1110,601 1,325,0E 30,N0 6,675,000 21
----------- ----------- ----------- ----------- ----------- i ----------- ----------. -----------
22 TOTAL REVENUE 3,210.000 6,117,100 2,956,0110 6,SN,w 2,615,00 1 111.1011,000 IO,B%,NO 29,06,ND 22
.......... .......... ........... ........... ........... I ----------- --------'-- -----------
23 TOTAL RVAILAILE MOIR 12,391,00E 12,754,000 7,412,00 2160.000 1.192.00 27,501040 I,067,000 38,425.00 23
........... .......... ........... ........... ----------- i ----------- ----------- ...........
MPFNIMES
26 Nue of TRIAL Nerhe local... such 2,969,010 6,125,001) 6,I20,001 1,%t,M 904,00 i 16,160,01E 2,3%,00 17,1%,4N 26
25 District Collection again I.M.40 2.690,0011 6,615,M 1.625,60 2,475,00 i 12,596,004 2,10,0E 161154,00 25
26 , MSaMtwent Mreneat Paymenit IM,00 03,0E 1R,M 721,10 122,00 i 3,N6,4N 1,607,60 d,111,ON 26
27 Otter Ewssitcat 0 0 21
........ ........... ........... ........... ....------ i ----------- ----------- ----------
N TOTAL EMMDIIMIS 1.6M,00 1,RN,00 9,317,M 6,10,0E 4.181.00 2 0,556,0E 1,162,N0 3e,i0,M 28
-----"..... ........... ..""---... .......-... ........... i ---------- ----------- -----------
29 We,",l Carry-over 0 Nash Year 7,937.00 6,456,00 (1,90,0 ) (1,423,000) 12,919,000 i (2,919,00) 12%,NO) 12%,00) T1
COUNTY SANITATION 0ISTRICT NO. 5 6/17/97
SIAIENENI Of PROJECTED CNN FLU Page E
FISCAL IVAN$ 1911-88 1NRONN 1996-91
199E-93/
LINE 1991-88 1910.09 ITEMS 1990.91 1991.9E s-Year Total 199641 10-Year Joel
.... ....... ....... ....... ....... ....... ------------ ----------- .............
BOND FUIID)8)
0 Rm.,va,A Wry-fear fro Last Year 0.000 3E.000 E9,0N E5,000 0 SO.NO 0 30,D00 30
........... ........... ........... ........... ........... ........... ........... ...........
REVENUE
31 to Lmy JE,NO E1,0O EO,0m 63,00 63,N0 31
3E lee...t A"I.11ao0o WAR. 2,00 2.00 3,00 1,00 0 7,000 0 I.NO 3E
0 other INC... 0 33
........... ........... ........... ........... ........... ........... ........... ...........
36 TOTAL REVENUE &.00 25,000 EE,000 1.N0 0 70.00 0 10,00 is
........... ........... ........... ........... ........... ........... ........... ...........
35 TOTAL AVAILABLE TNRINB 56,N0 55,000 51.000 E6,N0 0 JO.ON 0 IN.N0 3s
........... ........... ........... ........... ........... 1 ----------- ----------- -----------
EXPEXOITNES
36 ODA /rietipal A Joeresl E1,0O E6,0O E6.000 E6.000 100,A00 100,00 36
31 Other Jomdituraa 31
........... ........... ........... .1......... ........... ........... ----------- -----------
30 TOTAL EXPINNTURES E1,O0 16,000 36,000 E6,000 0 100,000 0 100,N0 31
........... ........... ........... ........... ........... . ........... ........... ...........
39 Come,A Carry-Over 10 Nut Year 3E.000 39,00 35,00 0 0 0 0 0 39
60 Nest Year',Cry Varied F.CdlA9 BULL re,eeea 3E.0O 39.000 E5,000 0 0 0 0 0 60
........... ........... ........... ........... ........... ........... ........... ---------—
61 Fund Bale'.or (Oeficit) 0 0 0 0 0 ) 0 0 0 61
.......... ............ ............ . ........... z::z::ze::: eazz:::z:::............ ......... ............ ....... ............ ...........
BANANAS (Ad3u,t0d far mer-rued Uamfen)
AE Reserve,A CmrJ-five, fro eat Year 13.631.000 11.311.00 9,IE1,0O 2106.000 E.9E4,0O 11,651.000 1,03.00 1E,6t1,O0 6E.
43 TOTAL REVENUE 5,151,000 1,156,O0 6.365,00 8.531,000 7,306,O0 35,611,000 I1,EN,No 03,86S.N0 63
........... ........... ........... ........... ........... ........... ........... ...........
Al TOTAL AVAILABLE ENDING 10,382,00 19,129.00 16,409,0O 10,591,O0 10,130,00 ; 10,E4E,O0 50,131,00 96.496,000 46
As TOTAL EXPENDITURES 1,011,00 11,05,00 1E,6E3.0O 11613,000 B,E41,0O 46,359,0O 39,613,00 16,043,0N CS
........... ........... ........... ........... ........... ) ......----- ----------- ...........
66 Reserves 6 erry-Mer to Nevt Year 11,311,0m E,@a,ON 2,066,000 2,934,000 I,8B3.00 1,003,000 10,454,0O I0,4S4,0O 46
al Next Year's Dry Period fuedlN Aqulreaml0 1,200,000 1,310,000 1,565,000 1,110,00 E,033.O0 E,O3,000 4.09,000 1,0W,ON 61
........... ........... ........... ........... ........... ........... ........... ...........
49 FUND BALANCE OR )DEFICIT) 10,111,DO 6,754,0O O1.000 1,154,Ow (10,ON) )150.Om) 6,365,00 6.365,000 40
COUNTY SANITATION DISTRICT NO. 6
OF
ORANGE COUNTY
4i)PN�TArro�,
°litan O OAS
T��
OV(no ^ill oK Ctp
Since 195A .�
OggNGE COUNT
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 6 6I17181
BUDGET RECOMMENDATIONS
1981-80 FISCAL BEAR
DISTRICT 16 3MIARy
i
AP UT BURET
1 AEBUDGENDED
N2MIMIM M A[COIAII Ilit[ IUMEI IMHI eUMfi
i 19M•M i 1916-M 1 1907-M 1 -
REMIRMENIS
i i 1
Operating B Capital ....Srexnla i
a a e
Operating Fund 4,077,M1 3,239,OM i 3,30.00 1
_ a
Acca ulaled Capital Outlay Feed 1 1,316,/00 i 1.011.MO i 6.iM,MO i
facilities Revolving Fund 1 1,054.000 ! 1.719.M i 2,1/9.001 i
1 --------- i ---••------ i --••--_---• ,
SUB-TOTAL OPERATING A CAPITAL i 9,SI7,M/ i 12,9M,OM i 12,137,OM i
Debt Retirement 1 Bond andInterest feed - ItSI 70,2ed 1 S/,MI 1 21,W 2
1
TOTAL REOUIREARTS 1 9.581,266 i 11,IM,M1 i 12,164,09 i
fMD1AG
Operation B Capital Feedim9
Cash A Investments (Appropriated
Reserves and Carry-Ow) i 3,221,OM 1 7,I06,000 i 1,32S,M0 i
i a
Other Rerean 1 2,M6,OM 1 4,099.000 1,3M.M0 e1
Anticipated In Allaatir 1
From It Lary i 1,116,OM 573,000 1,095,100 i
1 _-_--_.... ........... 1 ______---- 1
SUB-IOIA OPERATING A CAPITA i 9,317.000 12.900,M0 1 12,735,M0 i
r i
Debt Retirement
i
a
Cash A Investment, IApprirdated
Deserves 6 Carry-Over) 1 40,2116 i 39,929 1 29,179 1
Other Revenue I,Ni i I.011 !
AnDunt Raised by Tares for
Debt Obligation i 26.0M i 15.875 i
SUB-TOTAL DEBT RETIREMENT 70.266 58,M1 29.139
i • •-------- 1 ----------- 1 _____-----• ,
TOTAL FUNDING i 9,581,266 i 11.038.1106 i 12,761,t" 1
,Adjusted for Inter fund Transfers
COUNTY SANITATION DISTRICT NO.6 Pap 1
BUDGET RECOMMENDATIONS 6/17/87
1987-80 FISCAL YEAR
FUND 16 OPERATING
_______________________________________ _ ___________ ___________ i ----------- i ----------- i ...._____._
ESTIMATED
APPROVED i APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET ; EXPENDITURE BUDGET
1985-86 1986-87 ; 1906.17 1967-88
....................................... ........... ........... i ...........
OIEARTItl6
i
Directors' Fees 11500 1,500 6,200 6,500
Contractual Services �,
Share of Joint Operating ; 1,400,000 1,631,000 ; 1,343,400 ! 1,791,000
Trunk Maintenance 25,000 35,000 7,200 35,000
Pump Station Maintenance 15,000 20,000 19,675 25,000
Permit and Ind. Waste Admin. ; 25,000 ; 20,000 ; 21,200 ; 20,000
Connection Fee Admin. 17.000 ; /1,000 ; 42,100 ; 38,400
Bond Collection Expense ; too ; 100 100 ; ; 100
Tax/Fee Collection Expense ; 3,900 2,500 ; S,000 ; ; 6,000
Treasurer's Investment Ads.
G Banking Fees 4,000 2,000 4,400 5,000
i
Utilities 11,000 u,000 e00 j 1,750
User Fee Expense 10,000 1,500 � 5,800 5,000
I
Professional Services 2,000 8,000 1,900 5,000
Printing And Publication 3,250 ! 1,150 ; 400 1,000
Travel G Meeting - Directors 250 ; 250 200 , 250
,
,
Uncol lectiDle Accounts 1,000
----- ; ..... ; -----,
TOTAL OPERATING 1,522,000 1,M 000 1,IS1,975 1.941,000
NON-OPERATING
_____________
i i i i i
Interest
Expenses Applicable to Prior Years 31100 3,D" i 3,000
TOTAL NON-OPERATING 3,001 3,000 0 3,010
........... ..........' i ..._....... i i �__._...__.
TOTAL OPERATING B NON-OPERATING 1,525,001 1.11111,061 I,/S7,975 1,91/,000
RESERVES
i i i i i
Appropriation for Contingencies 1,189,000 691,000 633,000
Authorized General Reserve - ....... ......0 ; ------0
TOTAL RESERVES 2,552,000 1,462,000 0 1,605,000
TOTAL REQUIREMENTS 4,071,000 3,250,000 1,457,915 3,549.000
COUNTY SANITATION DISTRICT NO.6 - Page 2
BUDGET RECOMMENDATIONS 6117187
1987-88 FISCAL YEAR
FUND 16 OPERATING
.. --------------------- ----------- ----------- i ----------- i ----------- ,
___________
ESTIMATED
APPROVED APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE BUDGET
1985-86 1986-87 1986-87 ( 1987-86
i
AVAILABLE FUNOINB
Cash a Investments
(Appropriated Reserves and
Carry-Over) i 2,242,000 1,909,000 ( 1,166,162 ; ; 2,195,000
i ••--------- ) "'-------- ( ----------- ( ) -------.-
Fen ; I07,000 ; 172,000 ; 102,700 ; - ; 90,060
Interest L MisC. Receipts ) 239,000 ) 121,BO0 ) 171,700 135.000
Delinquent taxes ) ------ i ------ ( ------ ; 31,000
i
i
SUB-TOTAL 419,000 ) M,000 306,000 259,000
r ,
i
Tax Allocation ) 1,393,000 ) 958,000 955,900 ; ; 1,081,000
SUBTOTAL ; 1,416,000 ( 973,000 ; 902,500 ; ) I,m,ODO -
( ----------- i __-------- i ----------- i i _-""-----
TO7AL AVAILABLE FUNDING ( 4,077,000 ; 3,250,000 ; 3,033,262 ( 5,509,000
COUNTY SANITATION DISTRICT NO.6 Page 1
BUDGET RECOMMENDATIONS 6111/87
1987-88 FISCAL YEAR
BUSH) 16 ACCUMULATED CAPITAL OUTLAY
....................................... ----------- i ----------- i ------"-__ j _"___-___ i ---_-_--•--
i i ESTIMATED
APPROVED APPROVED i ACTUAL ( ) NECIIAnDED
DESCRIPTION OR ACCUMIT TITLE ( BUDGET ; BUDGET ; EXPENDITURE ; BUDGET
1985-66 i 1986-87 ' 1986.97 i i 1981-M
PROJECTS AND EXPENDITURES
_________________________
Treatment Plant Expansion ; 1,6%,100 ; 2,585,000 ; 1,105,101 ; ; 2,946,000
i i f i i
Appropriation for Nester-Planned
Treatment Plant Facilities ; 765.000 ; 3,097.000 ; ; 2,973,000
i Raster PIanIEIA Update 40.000
Radio Linked Telemetry System ; 10,000 ; 10,000 ( ! 10,000
, r r
Coast trunk force Mains:
- S.A. River to Bitter Point
Pump Station - Phase II 5-19-22 ; 133,000 ISO.000
- Bitter Point Pump Station
i
to Newport Blvd. 5-19-23 315,000 5501000 ; 35,001 17,000
- Santa River to Rocky Point ; 600,000 ;
i
- Newport Blvd. to Back Bay 5-19 ; ; 128,000
- Rocky Point to Rampart Blvd.
(South Side) 90,000
- Bitter Point Pump Sta. Upgrade ) ; 51000
- Rocky Point Pump Sta. Upgrade ) ) I/,000
i r r
Flom Analysis 6 Metering 25,000
r r
Rehabilitate Lido FX and DCX
FM (Lido FM to Valve 'B') 50,000 ( 50,000
i r r r
- Flom-Based Equity Adjustment ; 1,235,400 ; I,I31,000 ; I,031,111
Saint Narks Equity Purchase
r i ,
i r i i
Earthquake/Flood Damage Reserve 52,000 110,AC1 153,010
r r r
Appropriation for District
r i
Facilities Improvements and
Expansion 175,000 175,001 Solids 175,000
TOTAL REOUIRENENIS 4,386.000 ) 1,011,600 i 2,821,191 6,709,000
COUNTY SANITATION DISTRICT NO.6 Page 2
BUDGET RECOMMENDATIONS 6/17/87
1987-80 FISCAL YEAR
FUND 16 ACCUMULATED CAPITAL OUTLAY
....................................... ) ----------- i ----------- i ----------- i --------"' i -----------
i ESTIMATED
APPROVED i APPROVED i ACTUAL i RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET i BUDGET 1 EXPER017VRE 1 1 BUDGET
1985-96 1966.87 1986.87 1987-80
............................... ........... i ........... i ----------- ........... -----------
AVAILABLE FUNDING ; )
.................
Cash 6 Investments
- (Appropriated Reserves and
Carry-over) ; 2,297,000 ; 4,329,000 ; 2,800,436 ; ; 3.532,000
........... ) ----------- I ........... ----- -----
Joint Marks Equity Sale ; 202,000 ; 600,000 777,830 ; ) 1,104,000
District l/ Equity Sate ; ; 1,078,000 ; 1,070,038 ; )
i
Federal and State Grants ; 330,000 ; 129,000 ; ; 311,000
Sale of Capacity Rights ) 247,000 ) 231,000 34,830 ; ) 222,000
Fees ( 71,000 ) 1 i i 38,000
Supplemental User fees i 938,000 ) 1,135,000 982,100 1,160,000
Interest and Rise. Receipts i 221,000 ) 309,000 ) 340,294 277,000
........... ) ........... ) ----------- i ) -- --------
SUB-TOTAL ) 2,069,000 ) 3,682,000 ) 3,213,392 i i 3,175,000
........... ) ........... i ........... i ) ------ ----
transfer from Bond Fund ) ) ) ) 2,000
........... i ........... ........... i ) -- --------
TOTAL AVAILABLE FUNDING ) 4,386,000 ) 8,011,000 ) 6,013,82E ) 6,709,000
COUNTY SANITATION DISTRICT N0.6
.BUDGET RECOMMENDATIONS 6117/87
1987.88 FISCAL YEAR
FUND 16 FACILITIES REVOLVING
.............""'...................... i ........... i ----------- i ----------• , ,
ESTINAtEO
APPROVEC APPROvED AC Fiat i 1 RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET ) EXPENDITURE ; BUDGET
1985.16 IM-87 1996.17 ) 1907.88
....................................... . ........... . ........... . ........... . ....... .
PROJECTS AND EXPENDITURES i )
District 6,7 6 14 Relief System i 2S,000 i 1,5111000 i 29,000 i i 1,270,000
Fairview Road, Baker Street
to Nilson Street ; ; ) 1,134,000
Appropriation for District
Facilities Improvements and
Extensions 1,029,000 115,000 i i ; 175,000
........... ........... ) ........... i i -- --------
TOTAL REQUIREMENTS 1,054,000 1,719,000 i 29,000 ) ) 2,479,000
AVAILABLE FUNDING
Cash 6 investments
(Appropriated Reserves and
Carry-Over) ) 689,000 I 030,000 840,721 I i 1,593,000
........... i ----------- i ........... i ...........
Connection Fees 331,000 i 812,000 i 642,000 ; 769.000
Interest 6 Nisc. Receipts ; 35,000 i 77,000 i 82,000 116,900
........... i ----------- i ----------- i i .----------
SUB-TOTAL I 366,000 899,000 1 924,000 I 986,000
i ----------- i ----------- i -••-------• i i -----------
TOTAL AVAILABLE FUNDING 1,054,000 1,719,000 i 1,764,721 i 2,479,000
COUNTY SANITATION DISTRICT N0.6
BUDGET RECOMMENDATIONS 6/17187
1987-88 FISCAL YEAR
FUND 16 BOND AND INTEREST - 1951
________________________________ r ----------- , -----------
ESTIMATED
APPROVED APPROVED ACTUAL ! RECOMMENDED
OESCAIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE BUDGET
1985-96 1986-87 1966-87 1907-80
,
BOND RETIREMENT AND INTEREST
,
Principal on Bands 30,000 ; 30,OOD 30,000 27,000
Interest on Bonds ; 439
----- ----- ; --- ; ; ---
70TAL ; 32,360 ; $1,365 ; 30,995 ; ; 27,039
AUTHORIZED GENERAL RESERVE $7,926 ; 27,639 ;
,
Transfer to ACO Fund ; 2,000
,
TOTAL REQUIREMENTS 70,266 50.80/ 29,039
AVAILABLE FUNDING
,
Cash 6 Investments
(Appropriated Reserves and
Carry-over) ; 00,266 i 39,929 40,100 i ' 29,039
DelinOuent Taxes j 2,000 i 1,000 i 1,621
,
Interest 6 Rise. Receipts ) 2,000 2,000 i 1,701
----------- i ----------- ----------- -._________
SOB-TOTAL ) 4,RAN ; 3,000 ' 31362 ; ) 1
AMOUNT TO BE RAISED B7 TARES ) 26,000 ) 15,815 ) 56,642 ) ;
"------•- i ---------- ) ----------- i ) _---------•
TOTAL AVAILABLE FUNDING 70,266 ) 58,816 100.104 ) 29,639
Outstanding G.O. Bonds B 6130/87: $27,000
Final Payment Date: August, 1907
NUTT MlIA710 RESTRICT N.6 6117187
SCREDYtE Of DISTRICT COLLECTION "STEM PROJECTS
NOTICE TOTAL C.I.I. 11V-88 1NB-N IN9-N ]""1 1991-92 199E-93 1993-N
........... ...... I ----------- ----------- ----------- ----------- ----------- ----------- ----------- ------_--.
RWSo tjRead let.try Ia) ID,mo ; 10,000
Win,QaIEIR Delete 40,N0 I 25,ON 15.00
Coast Trunk fora Nla:
1. Bider Point has station
te Report TIN. 5.19-R3(1) (a)a 73.00 s6,ND I1,N0
2. August Minn. an Bed BN 5-29 (3)1+)+ 130,000 1 2,0a0 I8,N0 55.00 S,ND
3. Santa AN River W Bitter Point
Fua station IT) (a)+ 1N.N0 1 N,NO 65,N0 65,ON
d. $Arky Point te tlnporl Wed.
UNTO Sidel (S) 1a) ",No 1 N,NO iD.NO
S. Bitter Point ones Ste. N9rede (1)(+)+ 23,N0 ; 30.000 3,N0
j 6. ANSI Point key SEA. NCrede (3) (+)a 24,000 ; a,M
Randall... projects(+) 115.0N ; 25,00 25.00 25,400) RS,ON IS,NO 25,0N 25,ON
........... , _--------- ----------- ----------a ........._ ........... --......... ........... ...........
Sub-total 90 fund 315,00 ; 11,06 IS.NO 95,00 100,N0 0.00 %coo 65,N0 95,ON
........... . ........... .... ...... ........... ........... ........... ........... ........... ...........
District 1,11 16 Relief W.... (3) (a) I,N6,N0 ; 31,N0 10,00 SN,NO 3N,N0 ND,NO
T+irviu RAN, $Aker Streak
to bite.Street (a) IS) 2,00,000 ; 2,00,DN
MinNII+NNs projects(b) 115.0N 25,N0 25,000 25,ON S,ON 25,ND 25,0 o S,NO
........... I ........... ........... ........... ........... ........... ........... ........... ...........
NO-blal FR'End 3,+19,010 ; 14,004 9S,N0 SS.ON 525.N0 2S,N0 S,NO S,ON 2,N5,ON
..-..._.-. ....------ ----------- ----------- ----------- ----------- ----------- ----------- -----------
RATED TNN 6,iN,NO ; 112,N0 211,00 6N,ON 625,00 315,ON IIS,NO IO,ON 2,IN,ON
I+I Fully Funded 1. RBter-PINNd facilities yrmemly Manor anslactl0o '
(b)Partially funded 2. IntesyhnNe facilities presectly Near "Sig.
(C)Net funded J. Nster-pluned Facilities srDeNled For lutun dnkp iamlaclim
a partially Rid by District 5
a Partially paid by Districts 7 and 14
CONK SUBMIT"DISTRICT". 6 4117181
$TAT"Of N IA"ICTU WI FLN 9m I
FISCAL 7EAAs 1917411 t" 1996-97
1992.91)
11Y[ INN•" "N-N 1f89-N 111F91 TENT•" S•Wr IOaI -- - 10•tpr Neal lIN
— -
----"E"1110 MO
1 UPON,.,6 arry-Over he.Last VON, 2,195,ON IdN,NE 1.565.00 1,00,W 2,069,W i 2,195.0" 2.2".m 111"'m 1
_....._.. _.._—... .._...... .......... ........... I _--------- ........... ..........
REVENUE
2 s6m Of It In Alknotion 1,"1,0" 1,237,010 1,355,000 1,184,040 1,625,00 i 6,830,000 10,767.00 I7,597,040 2
3 1m M,ON' 161,00 1.33:.0" 1.011,001 I.NI,wO 1 3,714,0" 12,263.010 17.971,04E 3
9 lowrect A Nwmlaoms I... IN,m 112.m 119.m 131,m 154'm i 651,ON 2N.m W,0" C
5 Other R.... 0 0 5
........... ........... ........... ........... ........... i ........... ........... ...........
6 TONAL REVENUE I,sm.m 2,196,00 1,BN.m 3.225.00 3. 0.000 i 13,211,000 23.255.0% 36.651,0011 6
........ ........... ........... ..._..... _------.— I ........... .......... ...........
I INK AVNWLI NFoI" 3.549.N0 3,101.w0 6.371.0110 3.125.00 116".84,11 I 15,311.000 JR.w6,IN N,651,Ow 7
......._.. .......... .._...... ._....... __....._ I ---------- .....__.. ..........
E2PENOI1""
8 Sap of Joint Yorks N 6 0 I.N1,ON 2.00.0" 2.30,0" 2,126,114 3.133,0" I 12,111,040 16,317.0011 36,193,440 1
9 Collptip Syslp N 6 0 and Other OPer. 153,00 174.00 2N.0" 212.00 267,w1 i I,ON,O" 2,070,W 3,10,m 9
10 Otar Eryewitum 0 0 10
......-... .......... ........... ......... ......__. I ._._..... ._..__.. .._......
11 TOTAL EXPENDITURES I,NV,(w 2,236,041) 2,571,044 2,956,m 1,0.m i 13,111,m 26,A7,000 39,41E,0011 11
It Anervp t arry-Opr in tlpt Ypr '1,605,M4 I,SN,NO 1,00,1N 2.N9,0w I.m. 1 I 1,2",000 (13.0414) im,m) N
U Nat I.Ar'n Dry aria foot"AeOuirepnts 472,N0 1.110.00 I'Mosso 1.678,00 1.M.m I I,M.m 1,6N,m MUM N
IC Food eeleme er Iwlicil) W,0" 447.00E 516,m "I'm SN,M I M.m (412N,040) (6.266,001) le
...p....v. ..vvv..:... ....pvvr.. ...:.c:.... ::..._: ( .v...:..v:r :..... m. ...........
CAPITAL 11A10(S)
15 Amsts 6 Lorry-mar Imo Last Year 5,125,000 6,02s,Ne I,"1,0N (I,M ,M) (2,691,Ow) ; 5,1n.m (2.193.014) s,1251010 Is
......_... .._....... ......... ........... ...'--'— I —_.._.... ......_� ._.._.�
REVENUE i
16 WAR, 373.010 12.00 091.00E 691,Ow Nl.m I 1,1".0" U.m 2,011.00 16
17 1"C COmedien 168,m "I'm 266,040 236,0411 231,m 1 11771,010 1,170,ON 2.941,eN ll
18 OUR, 1.191.00 516,000 236,000 119,N0 61,0" i 2.176.W 271,00 2,161,ON II
19 Salad Appity giant. 222•000 41.00 38,0w N6.0" 21.00 i 94Ipw ",Ow 1.047.010 19
20 i9wreel 1 Niscellemms IppO "LOOT 284100 10,0w 1 0 ( W,OM 0 6",m M
21 TnwrfunO Wool., 2,ON I 2.0110 1,w0 21
" OtMr Imp 1,106,OFo I,Iw,ON 1,104,00 2E
I......... ........... .......... ....._.... ...._—._ I _......... __------- -----------
23 York REVENUE ,M.UA 11276.0" 1,019,00 I1410.m I"'m i 8,619.NO I,W.m 10.161.0" N
........_. ..___... ........... ...I....... .......... 1 ------_--- —�.._. .._...._.
29 TOTAL AVAILABLE IUNOIN 9,I11,001 7.299.00 5,010.00 1213.001) (11)".001) I 13,70,00 11.171,04,11 IS,N6.N0 N
..... ......
.UCA.
25 Sap of hint Forts imieenl Pant 2.946,00 6.611.0011 0,001,00 I,N7,m 176,040 i 11,66,1" 2.376.001 17,02i'm "
N OlslrlCt wllplip Systp 217'm W."O 625,00 3",0w 115.ON I I,U7,"0 2.1",ON E,0",060 N
27 Other a0eoditerp 0 0 27
_......... ........... .......... .......... ._...__. I ..__..... ...-..._.. .......__
N TOTAL EXPENDITURES 3.163.00 5,30,000 4,713.00 2,262.0" I,091,011 I 16.537,0" 4,516,400 21,I03.m "
......... ........... ........... .......... ........... ---_----_ _........
29 laser",1 arrV'mr to Nut losr 6,025,60 1,991,Ow (1,M,000) (2,495.00I) (2.113,0w) 1 (2,793,00) (5.737,00) (5,137,w0) 29
COUNTY SANIIAiia DISTRICT No. 6 6117117
STATEREST Of PROJECTED CASH FLOW FLOW,E
FISCAL TEARS 1916.81 IXRN64 1995-96
199E-9lI
LINE 1989-0 190-89 190-90 1910-91 ItlF11 $-IM, TOM] 1996-91 10911r Tote] LIFE
....... ....... ....... ....... .�.... , .-_.._-.-. ...._._.. .............
IUD FNDIS)
30 Ms.,.6 CAm-aer Era Left Sell i9,o00 O D 0 0 i M,MO 1 E9.OM 0
........... ........... ........... ....._.... �....�- I __._-.. ....._-- -..........
RIVER[
11 in Lever- 1 0 31
31 Interest 6 nu1.110 1 Irrt9a 1 0 0 1 1 1 / 1 0 31
33 other Inros. 1 33
34 TOTAL REVENUE 0 1 0 1 0 ( 0 0 0 N
35 TOTAL A9AILASH E FUXDIX6 _ M,IN •��1 .�_^•0 �_•0 0 i A,MO 0 •'•11 M/ 35
--....... ..._._. ._-___ _— --..------ , �._.... --.._�_ -------
EMINDITN[l
Be MN Principal a Interest i1.M1 2/.M1 IyMO a
41 I.I.Had TNabr E.MI E.MI E,MO 31
M Other ExUaditres M
39 Toth ERPINOTTARES 19.00 1 1 0 l i 59.M1 1 19,011 M
60 Arena 6 GrrY'orer I.Meet for 1 1 1 1 A 5 1 0 / 60
el Nat You's or, Period NnLOry Reouirnenlf 1 1 1 0 IF 1 0 6 CI
..._..._. ......_... .......... ........... ...._..._ ; .._...._. ........... ...........
et Fuse e.laOs or (Deficit) 0 1 0 0 1 0 A 0 M
:xxxe.Exa:x :::::::::::: a::x:==: :::::::::::: :::::rr::::: ::::xr.r::: m.....r:: •.•••......
SOW' (Adjusted for Inter-fund Innsfers)
63 Re....a,1 Gn9-Nave Ira Left Mr 1,A9,M1 116M.M0 3,SS6.0 0 N.MO (424.010) i 7.349,O0 ($M.OM) 1.I9,M1 0
IC TOTAL MNOUE 5.611,41,1 3.6M,M0 3.8E5,000 6,6¢.OM 6,613.OM E1,1O,0O 24,B1/,OM 66,691,M0 66
-.-_.....- _--------- ----------- --_..._-- .._.._._ , ----------- ----------- ...........
65 TOTAL A9AILMLE ENDING IE,166,400 11,10.00 31301.0O 6,ME.M1 3.M1,M1 i M,169,O0 24,313,M0 56.M6,M0 CS
E6 TOTAL EXP MIIMES S.116,M0 I,Ma,MO ),361,000 S.M/,MI 6.691,M1 . M,613,00 30,99,M0 O,626.O0's 66
......__. ........... ... ....... ........... ........-- i ----------- ----------- .._..-----
61 Raarves E Carry-Over to Next year 1,6M,M0 3.SX,MO 97,000 (626.M ) ISM,AMI i (SM,MO) (6,500,OM) (6.SM.OM) 61
48 Next Years Dry Net"Fundin,Reouiraente 912,M0 1.118.00 1110,00 1,6M,100 I.IM.MO 1 1,10,00 3,123.000 3,M3,M0 M
..... —......... ........... ........._ ...-..._-• i ----------- ----------- .._..--_-
69 FND BALANCE M (DEFIER) 6,651,0O 2,611,101) (1,119.0O) 11.106,0101 (E.O6,OM) i (1,EM,MD) 110,003,00) (IO,MI,MM 49
COUNTY SANITATION DISTRICT NO. 7
OF
ORANGE COUNTY
�P sill Ar10,V
q ktoPalitan 0 CIS
0
to = K
Since 195A .�
Og9'V E COVNC
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 7 gI7187
BUDGET RECOMMENDATIONS
1987-80 FISCAL YEAR ,
DISTRICT It PA MAY
----------------------------««««___
i
( Ap1A/1E1 i A1/NYf1 1[NI I
OFSMIITIN CRY NEIIMI LIRE i 1MFt INIEt NUT j
11115-86 19N-17 1987-N r
t
REQUIREMENTS
i
r
i
Oeraling d CAPITAL Iemelreemis
a
r
Operating Pond ; 5,N1,ON ! 6,86I,IN ; 8,OI8,000
Accuau lated Capital Outlay Fund 1 211,916,040 e; 311,251,410 25.060,000
Facilities Revolving fund ; U,222,N0 i 11678141111 i 61014,010
SUBTOTAL OPERATING L CAPITAL 76,16514100 41.743,ON 39,112,eN
Debt ..... sent
r i
Band and Interest fund - 1951 15,006 I5,2N ( 29,S3I (
Bond ae Interest fund • 1962 1,0I101141 181.615 ! 111.111 !
i 1 i
Bond and Intern! Fund - 1910 i 1.169,00111 i 1,344.1001 i 916,3N
SUBTOTAL RETIREMENT 3,215.ON 2,116,74 I,869,3N
i ......«... ( ........... ; •••---•---- r
TOTAL AEOUIREOEBTS. ; 40,4010,000 ; 44.119.141 1 41,041.358 1
: r
FUNDING
, r ,
i
i
.........d Capital funding r
, r
r
Cash L Investments (Appropriated
Reserves and Carry-Over) 19.2N.ON 1 25,515,N0 ( 32.II1,N0
i
Other Revenue ( IS,IRS,N0 i 13.51411111111 i 7,I71,N1 �
i
Anticipated tar Allocation
From It Levy i 2.I64.B00 i 117111.0011 i 2.MIQIO ;
SUB-TOTAL OPERATING L CAPITAL ; 36,765,110 i 41.745,0" i 39,172,N0
----
Debt Retirement
,
Cash B Investments (Appropriate ;
Reserves a Carry-Over) 1 2,995,000 2,235,741 i 1,741,39
Other Revenue 2N,000 11 141.00 i I0,00
Amount Raised by laves for
Debt Obligation 0
i
SUB-TOTAL DEBT RETIREMENT ; 3,213,0011 ( 2.37d,711 1,N9,7N
i ........... : ........... ; •--••-•---- ,
TOTAL LANDING 10,040.ON 11,119,711 ( /I,NI,SN
'Adjusted for Inter-fund Trans Fen
COUNTY SANITATION DISTRICT N0,7 Page 1
BUDGET RECOMMENDATIONS 6117/87
1907.88 FISCAL YEAR
FUND 17 OPERATING
______________________________ i ----------- i --------- i ----------- i ----------- i .._________
E371HATEO
APPROVED ; APPROVED ACTUAL ; RECOMMENDED
DESCRIPTION OR ACCOUNT T17LE i BUDGET BUDGET EXPENDITURE i i BUDGET
i 1985-06 1986-07 1986-07 1987-80
i i i i i
OPERATING
i i i i i
Director's Tee l5,000 15,000 8,300 101500
i i i i i
Contractual SBrVICBe
Share of Joint Operating 1,119,000 1,863,000 1,757,100 ; 2,335,000
Trunk Maintenance 100,000 165.000 ; 272,300 420,000
Manhole 6 Line Repairs ; 19,000 13,000 50,000
Pump Station Maintenance i 140,000 215,000 223,600 250,000
Permit and Ind. Waste Adm. ; 170,000 ; 150,000 ; 109,300 ; ; 126,000
Connection Fee Admin. 30,000 50,000 ; 20,600 ; ; 25,000
Inter-Dist. Sewer Use Chg. ; I,800 ; I,8D0 ; 1,800 ; ; 1,800
Bond Collection Expense i 100 i 100 100 100
Tax Collection Expense 4,600 ; 6,100 ; 6,200 ; ; 7,100
Treasurer's Investment Ada.
6 Banking Fees ; 15,000 ; 15,000 ; 18,700 ; ; 20,000
Utilities ; 65,000 1 115,000 ; 64,700 ; ; 75,000
Professional Services 10,000 10,000 ; 14,"0 ; 20,000
Printing and Publication 1,500 1,000 ; 2,100 2,000
Travel and Mtg. - Directors 500 500 ; S00 500
i
Uncpllectible Accounts ---- 2,000
- ..... ----- ; -----
TOTAL OPERATING
3,345,000
i --------- --------- i --------- I i ---------
NON-OPERATING r
i r ,
Interest { 8,000 11000 I81100 2,000
Expenses Applicable to Prior Years 1,000 1,000 1.000
---•------- i ----------- i ----------- i i ___.___..--
TOTAL NON-OPERATING i 9,000 ; 2,000 ; 10,100 ; 3,000
----------- ----------- I ----------- i ._._.._---_
TOTAL OPERATING 6 101.OPERATING 2,2B3,000 2,630,000 21535,300 3,348,000
-------•--- , ----------- r ........... , , --------_-_
RESERVES
Appropriation for Contingencies 2,142,000 ; 2.862,000 3,026,000
Authorized General Reserve 4,000
--------- --------- ; ; --- ------
TOTAL RESERVES ; 3,204,000 4,177,000 ; 0 ; 4,700,000
i ----------- i •-•-------- ----------- i i ----"-_____
TOTAL REQUIREMENTS 5.567.000 1 6,807,000 ; 2,535,300 ; 0.040,000
COUNTY SANITATION DISTRICT NO.7 Page 2
BUDGET RECOMMENDATIONS 6117/87
1987-08 FISCAL YEAR
FUND 17 OPERATING
_______________________________________ _ ___________ r ___________ , ----------- r ----------- r ____-______
EeiIMATED
APPROVED APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET ; BUDGET EXPENDITURE ; BUDGET
1905.06 1986.07 1986-87 i i 1987-88
,
AVAILABLE FUNDING
Cash a Investeents
(Appropriated Reserves and
Carry-Over) ; 2,412,000 3,282,000 3,029.010 ( ; 4,522.000
----------- i ••--------- ----------- r r ---- ------
Fees 626.000 400,000 206,900 230,000
r r r r
Interest 6 Misc. Receipts 28/,000 I 264,000 $90,000 327,000
Delinquent Taxes 81,000 ; 143,000 76,100 04,000
i ----------- ----------- r ----------- r r ----_----_-
SUB-TOTAL 991,000 807,000 673,000 641,000
r
r , r
r r r
Tax Allocation 2,040,000 ; 2,571,000 ; 2,338,800 ; 2,634,000
r ,
Redevelopsent Agency Tax
Pass-Through ; 92,000 99,000 ; 178.300 182,000
SUB-TOTAL 2,164,000 i 2,718,000 ( 2,S81,500 i i 2,885,000
----------- i ----------- i ----------- ( i ------ ----
TOTAL AVAILABLE FUNDING ; 5,567,000 6,907,000 ; 6,293,510 ; 8,048,000
COUNTY SANITATION DISTRICT N0.7
BUDGET RECOMMENDATIONS 6/17/87
1987-89 FISCAL YEAR
FUND 17 ACCUMULATED CAPITAL OUTLAY
....................................... . ----------- i ----------- i ------•---- i --------•-• i ---•-_---•-
i ESTIMATED I 1 -
I APPROVED I APPROVED I ACTUAL 1 I RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE 1 BUDGET I BUDGET ; EXPENDITURE I BUDGET
1 1985-86 1986.87 1 1986-87 1 1987-88
....................................... i ----------- i ----------- -•----•---- i ........... i --------___
PROJECTS AND EXPENDITURES I I 1 1
Treatment Pliant Expansion 1 1,996,000 ; 2,807.000 1 1,869,300 ; ; 3,403,000
Appropriation for Master-Planned
Treatment Plant Facilities 1 8,267,000 ; 11,192,000 ! 1 ; 20,838,000
r , ,
Radio Linked Telemetry System ; 125,000 ; 125,000 ; ; 1251000
Master Plan/ETA Update 55,000
Joint Norks Equity Purchase ; 239,000 ; 25,000 ; 191,228 ; ! 28,000
Earthquake/Flood Damage Reserve ; 61,000 ; 119,000 ; ; ; 1811000
Appropriation for District Facilities i
Improvements and Expansion 1 10,265,000 18,990,000 1 54,000 I 1 350,000
----------- i ----------- i -------•--- i i ...........
TOTAL REOUIREMENTS i 20,976.000 i 33,258.000 i 2.114,529 i i 25,060.000
AVAILABLE FUNDING
.................
Cash 6 Investments I I I 1 I
(Appropriated Reserves and
Carry-over) i 10,562,000 i 21,798,000 i 16,399,855 i 22,718.000
i •-------"' i ----------- i ........... , , ---- ------
Federal and State Grants i 405,000 1 140,000 i 1 i 112,000
r , r
Equity Sale t0 District 14 1 1 1,092,000 1 1,091,773
i i i i i
Flow-based Equity Adjustment 1 8,130,000 1 8,440,000 i 8,440,455 i
Sale of Capacity Rights 1 411,000 i 250,000 1 46,769 i i 262,000
Fees 1 211,000 i 160,000 1 82,800 i i 92,000
r
Annexation fees 1 1 1. 2,059 1 1
i i i i i
Interest and misc. Receipts 1 1,224,000 i 1,378,000 i 1,792,775 i 1,546,000
i ----------- i ----------- ----------- i i ...--------
SUB-TOTAL i 10,414,000 i 11,460,000 1 11,456,631 I i 2,342,000
i ----------- i ........... ----------- i i ...........
TOTAL AVAILABLE FUNDING 1 20,176,000 i 33,258,000 127,856,486 i i 25,060,000
COUNTY SANITATION DISTRICT NO,7 Page 1
BUDGET RECOMMENDATIONS 6117/67
1987-88 FISCAL YEAR
.. FUND 17 FACILITIES REVOLVING
--------------------------------------- i ----------- i ••••....... ........... i ---•--•---• i -----------
i ESTIMATED
APPROVED ; APPROVED ) ACTUAL ) RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET i BUDGET i EXPENDITURE 1 i BUDGET
( 1985-86 1986.87 ; 1986-87 ; 1987-09
....................................... i ........... i ----------- i ----------- ( ........... i ...........
PROJECTS AND EXPENDITURES
.........................
Tustin-Orange Reaches 17 ad 18 ; 511.000 ; ; ; ; 600,000
Main Street Trunk Sewer ; 2,700,000
Von Korman Trunk Sewer ; 3,300,000
r r r r r
Main Street Pump Station ; 3,400,000 425,000 437,000 ( i 20,000
Pump Station Modifications
MacArthur ) 100,000 ) ( ( 110,000
Lane Road 30,000 i 30,000 ( ( ; 10,000
r r ) r r
District 6,7 6 II Relief System ; ) ; 10,000 i ; 1,841.000
Airport Diversion (South) ; ; ; ;' 650,000
Airport Diversion (North) 650,000
Orange Park Acres Sewer
Installment Purchases ; 138,000 134,000 1,000 i ; 133,000
i i i i i
Mc6ax Sub-trunk Parallel 400.000
Nc6ax Lift Station ( ( ; ; ; 200,000
Michelson Relief Sub-trunk 160,000 5509000
Campus Relief Sub-trunk 160,000 550,000
Appropriation for District
Facilities Improvements and
Extensions and Reimbursement ( 63,000 ; 169,000 ) ; 350,000
TOTAL REQUIREMENTS 14,222,000 ( 1,678,000 448,000 ( 6,064,000
...........
COUNTY SANITATION DISTRICT N0.7 Page 2
BUDGET RECOMMENDATIONS 6117/87
I967.88 FISCAL YEAR
FUND 17 FACILITIES REVOLVING
....................................... ) ----------- i --------•-• i ---•------- i --------•-• i --------•--
i ESTIMATED
APPROVED ( APPROVED ; ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE ( BUDGET i BUDGET ( EXPENDITURE i ) BURET
1905-86 ; 1906-87 ; 1986-87 ; 1907•88
....................'-"-_ ............. ' ----------- ----------- -------••-- ----------- .-----••---
AVAILABLE FUNDING
Cash 6 Investnents
(Appropriated Reserves and
Carry-over) i 6,232,000 435,000 ( 6,797,926 i i 5,177.000
----------- ----------- i ••------••- i i -----------
connection Fees ; 810,000 ; 1,000,000 ; 112,000 ; ; 500,000
Contributions in Aid of
Construction (IRMD)Main Street Pomp Station ; 2,250,000
Interest 6 Nisc. Receipts ( 610,000 ( 243,000 ; 419.300 i i 387,000
--------"' ----------- ----------- -_---------
SUB.IOTAL ) 3,700,000 1,24S,000 831,300 ( ) 087,000
i ----------- ----------- ( ----------- ) i -_-_-._____
Transfer from District 14
i
AID Fund ) ------0 ) )
TOTAL AVAILABLE FUNDING ) 10,222,000 ; 1,678,000 7.629,226 ( ) 6,066,000
COUNTY SANITATION DISTRICT N0.7
BUDGET RECOMMENDATIONS f/17/I7
1917-09 FISCAL YEAR
FUND 17 BOND AND INTEREST - 1951
....................................... . ........... . ----------- , ----------- i ----------- i -----------
i ESTIMATED
APPROVED APPROVED ACTUAL ; ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ; BUDGET
1985.96 1986.81 1916-81 1917-M
,
BOND RETIREMENT AND INTEREST ;
i---------------------
Principal on BOMB { 11,000 14,04111 14,000 11,001
Interest on Bands ; 578
..... ; ... ; --- ---
TOTAL i I5,330 i 11,%2 i 14,737 i 14,578
r r i r
AUTHORIZED GENERAL RESERVE 59,670 { 28,332 14,955
----------- i ----------- i i i ------'----
TOTAL REQUIREMENTS 75,0I11 i 43,294 29,533
AVAILABLE FUNDING
-----------------
Cash L Investments
(Appropriated Reserves and
Carry-over( 68.000 40,2" 10.903 20,533
i ----------- { ------- i ----------- , ------.-.._
r r �
Interest and Misc. Receipts I'm 3,OM 2,302
i ---------- i -------•-•- i ----------- -_--._._.--
SUB-10TAL 7,000 3,000 2,302 •; ; 1.000
__»------- i ----------- i i ..------...
TOTAL AVAILABLE FUNDING 75,000 43.294 43,105 i i 29.333
Outstanding G.O. Bonds 6/30/87: 129,000
Final Payment Date: August, 1988
COUNTY SANITATION DISTRICT NO.7
BUDGET RECOMMENDATIONS 6/17/87
1987.98 FISCAL YEAR
FORD 17 BOND BUD INTEREST - 1962
....................................... ----------- i ........ ( ........... i ........... ( ...........
ESTIMATED i
APPROVED APPROVED 1 ACTUAL ) RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE ; BUDGET BUDGET ; EXPENDITURE BUDGET
1985-86 1986-87 1986-87 1987-BB
....................................... ----------- ----------- i ........... i ----------- i ...........
BOND RE71REMEIT AND INTEREST
............................
Principal on Bonds 180,000 190.000 100,000 I 190,000
Interest on Bonds 46,990 43,740 43,740 i 37,440
----------- i ----------- i ........... i i ----•-----_
TOTAL i- 226,890 i 223,740 i 223,740 i i 227,440
AUTHORIZED GENERAL RESERVE 1,204,110 764,905 ( ; 617,047
----------- i -------"'- i i i ---- ------
TOTAL REQUIREMENTS 1,431,000 988,645 ( ; 944,407
AVAILABLE FUNDING i
----_____________
i
Cash 6 Investments
(Appropriated Reserves and
Carry-aver) ( 1,306,000 ( 929,64S ( 934,439 791,487
----------- ) ----------- i ----------- i ) ...........
Interest 6 Misc. Receipts 59,000 76,13553,000
= ------- = ------ ------ ; ;
SUBTOTAL 125,000 59,000 76,135 $3,000
i ----------- i ----------• ) ----------- i i -----------
TOTAL AVAILABLE FUNDING 1,431,000 998,645 i 1,010.574 644,487
Outstanding G.O. Bands 6/30/87: $1,030,000
Final Payment Dale: May, 1992
COUNTY SANITATION DISTRICT N0.7
BUDGET RECOMMENDATIONS 6/17187
1987-89 FISCAL YEAR
FUND 17 BOND AND INTEREST - 1970
--------------------------------------- ----------- , ----------- , ----------- , ----------- , -----------
� ESf[MAIED
APPROVED APPROVED ACTUAL 1 RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE 1 BUDGET 1 BUDGET 1 EXPENDITURE i i BUDGET
1 1985•06 i 1986.81 i 1986-87 1 1 1987-98
....................................... 1 ........... 1 ........... I ----------- 1 ----------- 1 ------....-
BOND RETIREMENT AND INTEREST
----------------------------
Principal on Bands i 325,000 i 350,000 i 350,000 i 1 300,000
Interest on Bends i 93,900 i 72,689 1 38,116 1 1 51,076
1 ........... 1 ........... 1 ----------- 1 1 ...........
TOTAL 1 419,900 i 622,488 i 408,114 i i 351,476
AUTHORIZED GENERAL RESERVE i 1,350,100 i 922,321 i i i 643,862
1 ........... 1 ........... i i i ...........
TOTAL REQUIREMENTS 1 1,769,000 i 1,364,009 i i i 995,338
AVAILABLE FUNDING
.................
Cash a Investments
(Appropriated Reserves and 1 1 1 1 1
Carry-over) i 1,621,000 1 1,265,809 1 1,275,91S 1 1 941,338
1 ----------- 1 ........... 1 ........... I 1 -----------
i
Interest 6 Misc. Receipts ; 140,000 1 79.000 1 76,668 1 i 56,000
1 ........... 1 ----------- i ----------- 1 1 ------....-
• SUBTOTAL i I40,000 1 79,000 i 76,668 I i 54,000
1 ........... 1 ----------- 1 ----------- 1 1 -------.---
TOTAL AVAILABLE FUNDING 1,169,000 i 1,346,809 1 1,352,363 i i 995.338
Outstanding G.O. Bands 6/30/87: Series •A• 1875,000
Final Payment Date: Series •A• August, 1989
COUNTY UNITATIJ DISTRICT NO.J 6113/17
SCHEDULE OF DISTRICT COLLECTION! SYSTEM PROJECTS
INJECT TOTAL I C.I.P. 1987-10 IM-89 1909-90 1991-91 1991.92 1191-93 1993-W
Radio linked Tel aentry lal 1II,w0 i I25.wd
Raster Ilan/FIN wool. (3) SS'Ow I R.Ow M,JO
Riddell.UPS,.I Projects (a) Slatted 1 50,op 50.00 50,w0 So,wO 50,w0 50,000 50,000
50-01a1 90 Feed ew.wo 0 210,000 70.000 wpw w.wo w,Cw 50.00 so,oJ
........... . ........... ........... ........... ........... ........... ........... ........... ...........
Tustin-Orage trunk Reaches U apt Is (a) 6J,OJ 6J,Jo
Orange Park PC...$ever Iw1+11. Porch. (a) 155,00 1 ii,JO 10,00 20.000 20.00 w,Ow 10.00 w,w0 13,00
Main Street was$fail.. (1) W. w,wo 1 fd,w0
District 6,7 6 16 Relief System (3) Mae 1.e90,000 1 10.000 so,aw ew;ew 6404.044) ISO,wa
Airport DSMdniw (South) (3) 1.) 6w.w0 1 60,Ow w.Ow
Airport DirenSan(North) (3) (a) 650,046 j 9,000 600,00
MMs Sub-trunk P+..11.1 (3) la) 10,w0 aw,we
Mao lift Station (3) (a) 200,000 1 200,00
Una Road Hep Stories (3) (+) 10,w0 1 lo,Ow
MacArthur Fees Station (3) ta) 110,00 IO.M 100,00
Nicholson Relief Sub-trunk (ai Sw,OOe 1 SO,wO 500,000
Caput Relief Sub-trunk (a) 550.w0 1 50.000 50tw4
Nin dliMIWa Projects (a) 350,0e0 54.00 50,00 w,wo 50.4011 w.wo 50.Ow w,wo
......... . ........... . . . . ........... . . .......
Sub-talal FR fund 6,135,00 1 32,00 160.000 I,Ue,OOD 3,Iw,0w 89.00 TO.wO To.Ow 64,000
........... . ........... ........... I-------. ........-- ...---I---- -----I..... ----------- -----------
GRAND TOTAL 6,665.00 1 31,000 97O,we 1,240,000 3.130,00 wO,wO 130.000 Iw,Ow 113.Ow
(a) Fully Funded 1. Raster-Planned facilities prdeeatly Under oewtructjOn
To) Partially Funded i. M I.,-Phwd facilities presently under deni/n
Icl Not Funded 3. Mentar-planned facilities scheduled for future desiPn/wwtructieo
e Portion to be shared by IRND/DSllrUl Np.lc
11 Portions to On Shared by District M.6 and IRw/District 00.14
COUNTY SANITATION DISTRICT NO. 7 6)11)M
STATEMENT DE PROJECTED C89M FEW PRM 1
TIME YEARS 1901-M THROWN 1996-97
9tt-93i
LINE ....... 19M-0 ....... 19Mi1 1"1.92 --Yen IOW I-M•M *Yfar Tat.)-------- LINE
OPEMTINB FWD
I sam"s,E Carrel", BY"Last YMr 1,5","0 1,100,000 1,130.060 4,529,001 I.M7,00 i I,3II,00 3,29,00 e,3B2,000 1
_......... ----_----- .......... .-._...» .»........ ) ._....---- ._........ .»...._..
REVENUE
2 Store of IC 1"Alloation 2,969,000 3,294,000 3,65S,0" 4,659,000 I.S",000 i II,4$5.000 31,21/,M0 N11721000 2
3 fen 230,000 242,000 2M,"D 2",0" 211,000 i 1,272,M0 L,{2d,M1 2,815,010 d
C Interest d Nocella... 1. .. 327,00 35,00 0B,"D dM,00 S0,00 i 1,S0,Me 0 I,SM,MI /
5 Other Revenue 0 0 5
........._ ........... .......... ._........ ........... ----.----- ------.--- --------_.
6 TOTAL REVENUE 3,526. M S,MO,MO 0,S1,M0 6,60,00 5,011,000 i 21,611,10 32,910,00 51,221.0M 6
..._..... ........... ........». .......... .......... 2 .....».... --------. --------_-
i TOTAL AVAILABLE TUBING 8,04I,000 e,SM.OM 8,957,000 9,I101,00 9.115,00 i 25,113,410 36,169,0110 ",741.000 1
........... ........... ........... .....».... ........... 2 .»------- ........... ----------
ENOENDITURES
B --3tore of Joint Mores M I O 1,331,06 2,M6,"0 3,01H.00e 3,9I,MO 1,01,00 i 15,743.00 31,699,DD0 47,141,000 a
9 collection SYRIAN M 1 0_and Other 0"r. 1.013.00 1,65,010 I.dM,e" I,M1,4" I.M.OM i 6,1",000 I3,743,0M 20,57/,6M 9
ID DIM, EYD0n6i N:n 0 1 18
......»». .... .. ......... ........... ........... . --------- ........... ...........
"0 L
it TOTAL EXPENDITURES 3,311, 1",000 6,6S 692,M0 S, ,DM $.136.0M i 22,ME,000 /s,662,MD 41,016,M0 11
.......... ........... .......... ........... .....».... ......... ---------- ...........
12 AOsar"s I Cmy-Dorm, 0 Next Your 1,70,0M C,IM,MO 4,529,140 4,07,000 3,IM,00 i 3,59,00 (9,273,M0) (9,213,M0) I2
IJ lot Year's Dry Carind Funding RAWIraen0 1,614,0" 1,925,00 2,214,0M 2,S46,001 2.9",0" ( 2,121.0" S,I1S,00 5.e95,0M 13
»...»».. ....»..... .._....». ....._.... ._._»... , ._........ ........... ..........
14 Fund of&=or (Deficit) 3.021,0100 2,795,0" 2,315,000 1,521,e1H) U1,00 Bills" Us,IM,"11 (15,Iu,M6) " '
MPrtM r"ols)
-------------- I
IS generous I Carry-over Fr" lost Your 27,895,1M 26,03,400 22,340,01) 16,967,100 16.M1,00 i 27,815,000 masm'MO 21,8"pM IS
_..__.-. ......... ........... .....»».. ._._..... I ._...._... .......... ..........
REVENUE
16 Construction Brant. 442,000 ",BOB seem SM,O" S"'We i 2.219.1M 97,0M 7.376,"D 16
Il Fen: co"eclien S0,00 $0.00 500,01" 5",00D 5M.M0 I 2,M0.0" 2,50,MD S'odo'm 17
18 Other 97,"O 97,00 101,0" 107,00 112,00 "9,M0 618,"0 1115710" to
19 Ssle of comity Rights 262.000 09,000 45,0" 739,M0 25,000, 1 1.120.00 III,OM 1.257,0M 19
M Interest I N0ullmms Inca. 1.931.000 1.136.00 1.393.00 I,IW,00 1,239,0" I 7,500,000 6,6",00 14,195,0M M
S SENT Rove 0 a 21
........... ........... ........... ....._.... ----------- i .......... ---------- ...........
BY TOTAL REVENUE 3,229,0" 2,479,10 2,619,040 3,I23,0" 2,456.00 i M,MB,OM 10,057,0101 S."S."1 22
........... ........... ........... ........... ...... I ........... ----------- -_....----
23 TOTAL AVAILABLE FUNDING 11.124,00 29,122,000 24,959,0111 M,OM,000 19,137'"0 i 61,"3,0" M,120,0" 51,"O,MO 23
........... ........... ........... ........... ........... . ........... ........... ...........
EX"MIMRES
26 Shen of Joint Notes iru0at sleet 3,483,010 3,5E2,00 I,IM,O" 2,30I,111) 1,151,0" 2 17,S2,M0 2,109,0" ",1211001) M
25 District cone tia cyst" 910,ODD 1.20,000 3,I10,M0 9M,401 124.00 i 6,4",OM S3,0M 6,"3,00 23
26 Othe, Laoendilues 20,000 M,OM 21.0m S
........... ........... ........... ........... .......... i ------.--- ........... ...........
27 TOTAL EXPEMDIIOS 1,481.00 6,7111.00 8,0112,00 S,20I,000 I,77I,00 i 23,740,M0 3,02,011) 26,782.00 S -
........_. ........... ........... ........... ........... . ........... ........._ -----------
" Reaves I Co,r,-ear to Next Ten ",613,"O 22."0."O 16,957,000 16,181,00 1e,M3,M0 I ","3,o" 2S,078,000 25,079,400 "
WaTY SANITATION DISTRICT 80. 7 6/17/97
STATEMENT OF PROJECTED CNN Fla Pas 2
FISCAL YEARS 1987-89 THROUGH 1996.97
1992-911
LIKE 1981-IB IM-09 198F90 1910-91 1991-92 S-Yea Take[ 1996.91 le-Year Teal CIA[
.... ....... ....... ....... ....... ....... ( ------------ ----------- ............. ....
BOND faD(9)
29 Remrwe S hvy-Dmr Era Lest Par 1,761,000 1,276,000 773,000 240,000 13,Om 1.161. 00 0 1,761,000 29
........... ........... ........... ........... ........... ........... ........... ...........
REV[NUI
30 Ta 1." 215,040 215.000 215.000 W
31 Interest 1 Mlmellmrous loose 108,000 IS,ON k,0a 9.000 0 ( 226.000 0 276.000 31
32 Other Inceee 0 32
.......... ........... ........... ........... ........... I ----------- ----------- ---_..----
33 IOIa REVENUE 1a,a0 73.om 36.00 9,M 21S,000 641.000 0 141,OAO AN
........... ........... ........... ........... ........... ...------- ----------- ----------
34 Talk AVAILABLE FUNDING 1,069,010 1.349,00 Oa.000 249,a0 MB,aO I 2,M2,a0 0 21202,000 34
........... ........... ........... ........... ........... ( ----------- ----------- ...........
EMIaITmLS
35 BAN Orimial S Interest 593.0m 576.000 89,000 236,000 M8,000 2,202,000 21202,000 35
E6 CAN,Emenditvru 36
........... ........... ........... ........... ........... ( ----------I ........... ...........
IT TOTAL EXPENDITURES S93,Oa 576,000 569,W0 236,010 2M,Da 2,2a,0a 0 2,202.000 37
........... ........... ........... ........... ........... ........... ........... ...........
38 Anerves L brry-Orer a Nest Year 1,276,000 773,000 240,000 13.000 0 0 0 0 a
39 Neat Year's be,ar50d India ANN....Oil 1,276,Om 711.000 240.00 13.00 0 0 0 0 39
........... ........... ........... ........... ........... ........... ........... ...........
10 fund emleme or (Deficit) 0 0 0 0 0 0 0 0 40
.......... .....es...s. ...:.... .. ............ ............ :err::::::: zz::::::::: :::�::::::..........r: ..... ... . ...•....:.. ............ ............
SUXNAIIY (Rdjumta tar Inter-faM Inmtaa)
91 Reserves G Carry-Dar Free Lai Pea 34,I18,000 32.619,00 21,833.000 21,726.000 20,961,000 i 34,1/0.00 21,322,00 34.118,Om 41
42 TOTAL REVENUE 6.86i'm 6,422.000 6,892.00 7,764,00 7,719,000 35,6m.Om 42.947,000 M,627,Om 42
........... ........... ........... ........... ........... . ........... ........... ...........
a3 TOTAL AVAILABLE FUNDING 41,041,000 39,041,000 34,725,000 29,190,000 20,40,000 69,89,0 0 64,299,0 0 112,05,000 43
14 70TAL EXPENDITURES 9,422,00) 11.2011,010) 19,999,0110 8,529,ROD I'ma.000 46,514,000 40,aa,Om 91,art'WO as
.......... ........... ........... ........... ........... ........... ........... ...........
15 Mserva I arry-Over 10 Nest Yea 32,619,000 27,833,000 21,726.00 20.961,000 21,322,000 I 21,322,10) I5,05,000 15,805.00 as
46 Nest Year's Dry Period funding Requirements 2,950,000 2,690,000 2,454,000 2,559,000 2,928,000 2,06,000 5,995.00 5,893,m0 46
........... ........... ........... ........... ........... ( ----------- ........... ...........
47 FORD BALANCE OR (DEFICIT) 29,669,000 25.135,000 19.212,400 18,402,000 16,394,WD I0,394pa 9.910.00 91910,0a 47
COUNTY SANITATION DISTRICT NO. 11
OF
ORANGE COUNTY
C P, ITATiOH
`topolitan O r OzS
��9e ���I
U m °
Since 1954 .�
ORANGE COUNT
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
COUNTY SANITATION DISTRICT NO. I1 6/17/87
BUDGET RECOMMENDATIONS
1987.10 FISCAL YEAR
DISTRICT ell SUMMARY
_______________________________________ _ ___________ _ ___________ _ ___________ _
i
I ABUDGET i APPROVED 1 REBUDGET 1
DESCRIPTION OR RCLOMf TITLE 965-36 1 BUDGET n06E1
1985-/6 i - l9Bi.p I
---- --
I
REOUIRENENn------------
i
Operating 8 Capital AaOuirements i
OperatlAN Fund 4,743.000 4,093,SAN 1 4,612,000 i
Accumulated Capital Outlay Fund 1 7,741.000 9,455,000 1 11,312,000 i
facilities Revolving Fund i 2,141,000 i 2,810,000 1 3,020,000 i
i "•••-•---• i •.......... 1 ........... i
SUS-n7AL OPERATING 6 CAPITAL i LS,232,000 i 17,1$8,000 i 19,984,400 i
s 1 ........... i ----------- 1 ...........Debt I
i
.... ...free...
i i i I
, � 1
Bond and Interest Fund - 1951 26,100 1 27,625 i 27.753 i
Band and Interest fund • 1951 1 91,625 91,90008,160
...... I ...... 1 ------ I
SUB-TOTAL RETIRENENT 117,725 i 119,325 I 115,913 i
,
TOTAL REQUIREMENTS 115,149,725 i 11,277,525 i 19,119,91J i
FUNDING ,
Operating f Capital .Funding
......
i
Rah 6 Investments erOPriand i
Reserves Carr and Carry-Over) i 10,250,000 i 11,352,000 i 11,778,000 1
Other Aevemee 1 3,301,000 i 3.969,000 I 6,078,000 i
Anticipated Tan Allocation
From q levy I 1,671,000 ; 1,817,000 2,020.000 i
I ---------- i ------ I •_-•-••---- ,
SUB•TOTRL OPERATING 6 CAPITAL 115,232,000 117.158,000 1 19,804,000 i
--------•-• i ----------- i ----------- I
Debt Retirement I i
Cash f Inmehenls (bproprlated
Reserves f Carry-Over) i 62,000 25,945 i $6,913 I
Other Revenue I 9,000 i 9,000 ' 7,000
i
Amount Refusal by Tans for 1
Debt Obligation 1 16.ns 94,580 1 52,000 1
1 ........... i •.......... i -----------
SUB-TOTAL DEBT RETIRENENT 117,723 i 119,525 115,913 i
,
TOTAL FUNDING i 15,369,/25 1 17,277,525 1 19,999.913 I
:Adjusted for Inter-Fund Transfers
COUNTY SANITATION DISTRICT WIT Page 1
BUDGET RECOMMENDATIONS 6/17/87
1987-99 FISCAL YEAR
FUND III OPERATING
....................................... ----------- i •---"""' i ----------- i ........... i --••------.
i ESTIMATED '
APPROVED ; APPROVED ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE i BUDGET I BUDGET EXPENDITURE BUDGET
1985-06 1996-87 1986.81 1987-80
.................................. ----------- i ••-•------- i ........... i ........... i -----------
OPERATING
Director's Fees 4,000 i 4,000 3,500 ; 7,000
i
Contractual SarVEgee
Share of Joint Operating ; 2,040,000 ; 2,236,000 ; 1,948,300 ; ; 2,491,000
Trunk Maintenance i 150,000 100,000 ; 81,900 ; 141,000
Manhole and Line Repairs ; ; 10,000 ; 9,100 ; 15.000
Pump Station Maintenance i B5,000 ; 112,000 ; 01,000 ; ; 120,000
Permit and Ind. Neste Admin. 75,000 ; 55,000 64,100 ; 70,000
Connection fee Admin. ; 38,000 ; 46,000 26,200 ; 30,000
fax Collection Expense ; 51000 ; 5,000 4,600 ; 5,300
Treasurer's Investment Adm. j
6 Banking Fees ; $.Do ; 8,000 ; 8,100 ; 8,000
r r r r i
Utilities 80,000 { R0,000 78,200 ; { 80,000
Professional Services ; 5,000 ; 5,000 ; 3,100 ; ; 5,000
Printing And Publication 1,000 I50 /50
Travel 6 Meeting - Directors ; 250 ; 150 ; 100 250
r ,
i
Unc011ectibla Accounts 1,000
----- { ----- ... ; -----
TOTAL OPERATING 2,493,000 2,663.000 2,308,400 I 2,982,000
•---""'--- i •---------- i ----------- i
NON-OPERATING
-------------
Interest ; 39,000 ; 4,000 ; 9,000
Expenses Applicable to Prior Years 3,000
----- ; ----- ; ; -----
,
,
TOTAL NON-OPERATING 44.000 8,000 0 i i 12,000
----------- i ........... i ........... i i -----------
TOTAL OPERATING 6 NON-OPERATING 2,537,000 2,671,000 i 2,308,400 2,994,000
i ----------- i ---------•- i ----------- i i -------_---
RESERVES ;
Appropriation for Contingencies ; 937,000 ; 886.000 ; ; 191,000
Authorized General Reserve ; 1,269.000 ; 1,336,000 ; ; 1,497.000
----------- i ----------- i ----------- --_____-_-_
TOTAL RESERVES 2,206,000 2.222.000 ; 0 ; 1.688,000
,
----------- ----------- i ----------- i , --.__---.--
TOTAL REQUIREMENTS 4,743,000 4,693.000 ; 2,308,400 ; 4,682,000
COUNTY SANITATION DISTRICT RO.II Page 2 '
BUDGET RECOMMENDATIONS 6/17187
1981.08 FISCAL YEAR
FUND III OPERATING
______________________-__-___--__---. , ----------- i ----------- , ___________ , ___________
ESTIMATED ;
APPROVED APPROVED ACTUAL I RECOMNEMED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ! MET
- ; 19BS-06 1986-87 1986-07 1987-M
,
AVAILABLE FUNDING
i
, r
Cash 6 Investments
(Appropriated Reserves and { ;
Carry-her) i 2,697,OM i 2,SS7,000 ; 2,2M,554 i 2,368,011
i ----- ----- i ----------- i ----------- i ( ._____-----
Fees i 272,00 i 213,001 i 21,110 i 100,0OU
, , r
Interest and Misc. Receipts ; 235,010 ; 169,00 ; 316.M ; ! I43,000
Delinquent lases ; 61,M0 ; 117,000 { 51,2M ( 63,000
,
SUBTOTAL 561,001 ( 619,000 ( 395. 00 ( ( 306,000
i ........... . ........... r ----------- r r ___________
, r
Tax Allocation ; 1,655,000 i 1,1l9,00 i 1,136,640 i i l,976,000
Subventions ( 23,000 i 38,BM ( 67,M0 ( S2,000
,
SUB 401AL ( ------0M 1,-
i ------ ( --------- ---------
TOTAL AVAILABLE FUNDING ( 4,743,000 ( 4,893,SRT 4,462,554 4.682.000
r ........... . ...........
........... . ........... . ........... , _____._..._
COUNTY SANITATION DISTRICT 110.11
BUDGET RECOMMENDATIONS 6/17/87
1907-88 FISCAL YEAR
FUND Ill ACCUMULATED CAPITAL GUIIAY
_______________________________________ I ----------- I ----------- ----------- I ----------- I -----.-_--_
ESTIMATED i I
APPROVED APPROVED ACTUAL I RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ! BUDGET
198S-86 1986-87 1986-87 I 1987-88
....................................... I ----------- I ----------- ----------- i ----------- i _-____.____
PROJECTS AND EXPENDITURES I I
Treatment Plant Expansion I 2,369,001 I 3,32/,000 2,176,200 1,071,000
, I
I
Appropriation for Xasler-Planned
Treatment Plant Facilities ; 5,030,000 I 5,615,000 ; ' 6,450.000
,
Raster Plan/FIR Update 10,000
i
,
Slater PoAD Station Modification 50,000 i 251440 I ' 25,000
,
Ocean Avenue Trunk Rehabilitation I 1/,000 300,000
i
Radio Linked telemetry System I5,000 ; 15.000 ; ; 15,000
i
i
Flow Analysis and Metering 26,000
_ I
Joint Works Equity Purchase ; ; 100,000 ; ; ; 114,000
i i I I i
Earthquake/Flood Damage Reserve I 16,011 I 141.000 { I I 212,001
, r
Appropriation for District
Facilities Improvements and
Expansion I 175,006 I 175.000 ; 4,000 ; I 175,000
----------- -""------ , - ---------
TOTAL REQUIREMENTS
I 7,111,000 i 9,155,000 i 2,191,200 11,312.000
AVAILABLE FUNDING
___--_..____.._
Cash 6 Investments '
i
(Appropriated Reserves and
Carry-over) i 5.891,000 ; 7,013,000 ; 7.050,103 ; 7,656,000
----------- , ----------- ----------- I I -----_--___
Fees I 06,000 ; 60,000 ; 6,100 ; ; $0,000
federal and State Grants I 481,000 { 166,000 ; I 511,000
,
Sale of Capacity Rights I 318,000 ; 297,000 I 138,760 306,000
i
Interest and MI SC. Receipts 616,000 ; 513,100 ; 610,827 ; 547,000
Bolsa Chios Annexation Fee 2,926,000
Joint Yorks Equity Sale - I 23,000 I I 9,100 I
Flow-based Equity Adjustment I 326,000 II8,000 I 117,555 I
District II Equity Purchase ---------i i i --------- ;
1,281.437
,
,
SUB-TOTAL I 1,850.000 i 2,442,000 i 2,149,119 I 4.326,000 _
i ----------- ----------- i - ---------
TOTAL AVAILABLE FUNDING ; .7,711,000 I 9,455,000 I 9.219,882 I 111,382,000
COUNTY SANITATION DISTRICT NO.11
BUDGET RECOMMENDATIONS 6/17187
1987-88 FISCAL YEAR
FUND 11l FACILITIES REVOLIFIIK
....................................... r ----------- , -----------
ESTIMATED
APPROVED APPROVED ACTUAL RECOMMENDED
DESCRIPTION 01 ACCOUNT TITLE BUDGET BUDGET EXPENDITURE BUDGET
1985-86 1986-87 , 1986-87 1987-08
,
....................................... r ----------- r ----------- i ----------- i ----------- -----------
PROJECTS AND EXPENDITURES
------
r r i
r r r
Edwards Trunk 2,501,100 ; 2,770,000
Projects Fulled by Developers:
Coast Trunk Sewer 500,000
r r i r
Slater Relief Line 100,000
r , r
Coast PYID Station/Force Main 100,000
r i r
Appropriation for District
Facilities Improvements and '
Extensions and Reimbursements 2,192,000 310,000 350,000
r i i
,
Reimbursement Agreement Payments 556,000 ;
TOTAL AEOUIRBEMENTS 2,748,000 2,810.000 0 3,820,000
r ........... . ........... r ...........
AVAILABLE FUNDING
-----------------
i
Cash 6 Investments
(Appropriated Reserves and
Carry-over) i 1.862,000 1,182,000 i 1,769,309 i 2,314,000
i ---------- i •---------- i ----------- i , .._-_------
r
Connection fees 150,000 ) 925,000 ) 521,000 600,000
Advance in Aid of construction 700,000
r r r
r i
Interest 6 Misc. Receipts ; 136,000 ; 103,000 ; 151,300 ; 146,000
,
SUB-10TAL 886,000 ; 1,028,000 675,300 ; 1.446,000
,
r
TOTAL AVAILABLE FUNDING 2,746,000 2,810.000 2.444,609 3,820,000
COUNTY SANITATION DISTRICT NO.11
BUDGET RECOMMENDATIONS 6/17107
1917-110 FISCAL YEAR
FUND III BOND AND INTEREST - 1951
....................................... ( ----------- i ----------- i ----------- i ---____---- i --.__._.___
ESTIMATED
APPROVED NPAWN i ACTUAL i BECOIIMENDEI
DESCRIPTION DA ACCOUNT TITLE MKT BUDGET ERPEADItUUE 1 BUDGET
( I985-16 1916-81 1916-17 i i 1911-81
....................................... i ----------- ........... i ---•------- i ----------- i -----_-----
BOND R17INENENT AND INTEREST
Principal on Bonds 12,000 i 13.000 i 13,001 i i I3,000
Interest on Bonds Ill
----- ----- ---
TOTAL 13,450 10,137 i 13,920 i i I3.013
i i i e ••__.._.• i i
AUTNORIIED GENERAL RESERVE 12,650 13.488 ; 13,960
•------•--- i ----------- i i -----------
TOTAL REQUIREMENTS 26.100 27,625 27.753
AVAILABLE FUNDING
----_____________
Cash I Investments
(Appropriated Reserves and
Carry-over) i HAND 10,023 i 13,587 ( 15.753
i ----------- i -------•--- ( ----------- i ) "'"'------
i
Delinquent Taxes ( I,001 i 1,100 i 616 i LA00
i i i i i
Interest I Misc. Receipts ) I,GQQ677
----- ( -----I'LIN --- ; 1----
SUBTOTAL i 2,000 i 2,000 i 1,321 i i 2,000
i ----------- ) ----------- ( ------•---- i , -----.-----
AMOUNT TO BE RAISED BY TAXES ( 111100 IS,202 15,616 ; ) 11,000
----------- i -••-------- ----------- i i -----------
TOTAL AVAILABLE FUNDING i 26,110 i 27,625 i 31,521 ( 27,753
Outstanding G.O. Bonds B 6/30187: 139,000 _
Final Payment Date: August, 1989
COUNTY SANITATION DISTRICT WIT
BUDGET RECOMMENDATIONS 6117/07
1987-88 FISCAL YEAR
FUND III BOND AND INTEREST - 1150
-------------------------------------- ----------- , ___________ , ___________ , ___________ , ___________
I ESTIMATED. ;
! APPROVED APPROVED ACTUAL ; RECOMMENDED
DESCRIPTION OR ACCOUNT Tim ; BUDGET ; BUDGET ; EXPENDITURE ; ; BUDGET
19115-06 1986-87 1906-87 1987-88
i
000 RETIREMENT AND INTEREST ;
Principal an Bonds ; 50,000 50,000 50,000 50,000
,
Interest an Bands ; 9---- ; ----- ----- 5----
,
,
TOTAL ; 59,375 ; 57,500 56,500 ; 55,500
AUTHORIZED GENERAL RESERVE ; 32,250 ; 3e,400 ; 32,660
i
TOTAL REQUIREMENTS ; 91,625 ; 91,900 p,160
i
AVAILABLE FUNDING
---___..__-_. -
Cash 6 Investments
(Appropriated Reserves and
Carry-over) ; 69,001 ; 15,522 ; 25,300 ; ; 61,160
----------- ) ----------- i ----------- ; ) -----------
DelinOuent Taxes ; 7,00 i 3,004 i 2,636 ; i 2,000
Interest 6 Misc. Receipts i 3,0p I--- i ---- ; I,IS7 ; ;
SUBTOTAL 71000 i 7,00 ; 6,673 i i 5,000
----------- ---------- i ___—___-__ i i ---------__
AMOUNT TO BE RAISED BY TAMES ; 35,625 ; 69,378 ; 72,906 ; - ; 62,000
--_-�--_� i ----------- i ----------- , , --------___
TOTAL AVAILABLE FUNDING ; 91,625 ; 91,940 ; 102,679 ; ; p,lED
Outstanding G.O. Bonds 1 6/30187: 1250,OM -
Final Payment Date: January, 1999
COUNTY dw11ATi0N DISTRICT 0.11 6117/97
SCHEDULE OF DISTRICT COLLECTION SYSTEM wOJECTS
PROJECT IDILL C.I.P. 1901.01 IM.09 1911"0 1990.91 1191-97 1992-95 IW5-9e
Radio LSw" W...tly (a) ll,ONO I5.m0
Raster PIWEIA Updale (a) O'Dell i 25.000 TS,wb
Sinter Pw. No Sletlpn AANb. (1) 25,Ow 25,000
Nmn status Truck SAYS. (a) 110.001 Ie.0011 SO."O 250,000
Rholimmus hejwbe(a) 175.000 ; 25.000 25,0w 25.00 RI'm 25am 25.00 2l,Sw
......_... i ._------_ --------- ........... ........... ........... .......... ........... ...........
nl-total ACD Iwd $69,000 11,100 1/0,000 2".0" 25,00 25,000 26.0w 25.00 25.000
EW"I Irani 13) (b) 5.100,m0 1 5,400,010
Mnnwe bllai.Iwai IS) 10) 7501000 ; no.000
Edlmer Intemoter (3) (e) Tw.on /!'OM
Neil"fill Swer (1) (c) TS'Om ; 750.00
Edison Goer Paw11LL (11 (0) 1el'm i Ow.m
bent Twat$we, (D)e 7,00.00 i 90.00 2d0'Ow 1,100,Om 5m,001
Shot belief Lim 13) (c)1 1.150,000 i ID'we 50,00 00 1,150,w0
Coot Pop 0talim and Force
Rain(5) (c)1 4.1n,000 I IaO,m 2.W."D 2100.00
Nwellanem Poiacbe,(a) 3'ON 1 w,nD 50,000 $0,000 $0.00 SO.m w,wb 501066
........... .......... ------.._— ........... ...------- ........... ........... ........... ...........
$6-total FA Fond 19.6m.on 0 750,0" 5,150,ON 6.im.0w 550,000 50,000 60."D 6,IOO,Ow
........... ........... ........... ........... ........... ........... ........... ........... ...........
hb•Iibel District Canstrwtim 20.219,000 1 14,Om "C'm 1,110,0" 6.nS,n0 575,000 75.001 76'm 6,125.01)
........... j ._........ .._....._ _..._.... ........... ........... ........... __------- ...........
Garfield Trani Swor (3) (C)o 2.000,000 j 500.00 1,500.00
....._.... ........... ..__..._ ._...._.. ........... ........... ......_... ...... ...........
hb•Iowl bminsar Demarcation 2,ON.000 1 0 0 0 mo'm 1,l00,000 0 0 0
........... 1 ........... ..__..... ._........ ........... ..._...... ._._.._... .... ...........
'AND last 22.219,000 i 14,000 "I'm 5.710.0" 1,22S,elm 2.075.00 75,000 75.000 6,125'm
:a::::::::: man:na n::unalr I':..... a, m—.....r nnnona oorrmo
To) Fuug Food 1. Nawr•plwnad facilities premlly liter contraction
(b) Partially Forded 2. Nwto•plaoned facilities presently under design
(0)Nit fated 1. Gasber-plamed facilities scheduled for future dubo/nwtructiao
e Project m he limnnd by coolant
ender Nwr Service hisburWeal Agrnml
11 Project to be mny liens"by welopet
Lm1Y SMITAIIW DISTRICT NO. 11 6/17187
SIATMMT AT ABMECTED COB TIN Gage 1
FIMI TEARS I917-80 Tom 1996-97
1,92-931
LIRE 1987-86 1988-89 1919-90 IM-91 1191-1! S-Yur Total 1996-97 10-Yur TOW) LINE
___ _______ _______ ____- ..------—_ -_.-._--- --..
"Tin Fm
......--..._
I Rnerm 6 Arry-Oar I .East Jar 2,318,000 I,Y8,000 713.E9 (t7t,m) (3.M.m) ( 2.M.OW (S.MS,m) 2,M,m 1
R[YFIIE -•_-_-
2 --Sun Of It In Allwlisn 2,0,91,010 2,JM,m 2,656.00 2.991,44) 3,315,000 13,472,000 21,511,000 37,9113,000 2
J Tees 1M,m IM,m 110,m 116,00 1U,M0 553.00 7M,m 1,259,0M S
1 Interest 1 RisallaaMa lean IU,m M,m 0 0 a zy,MO 0 229,m 1
5 Other MINN. 0 0 S
6 TOTAL REVERSE 2,M.m 2.M7.m 2,7114.1101 3,110.1140 S.m.m i II.M1,M U.UI,m M,MI.m {
7 TOTAL AVAILABLE ENDING I,flt,m I,M,m S.m.m •2,232,01,11 215,M ( I6,M,4" 19,M,m 11,Mt,m 1
E3GENDITDES
t sure of Joint Mrts N 1 0 2.191,M 2.IM.m S.M.m J.7M,M I.M7,m ( 16,m,m U.M.m M,619,m a
9 C011alioo Soto R S Deed Other Goer. M,M 5W,M M,M M,m M,m i S,MI,m {./M.m 10,211.0" 9
10 Other Eganditum 19,m m.m m,m 1.4I1.00 ( 2,m,080 I,tM.m 1.06.00 le
II TOTAL EIAEmMES 2,9M.m S,m.m I.M7,m s.AM,m 6,M.m ( U.M.M M,M7,m 67,Idt,m 11
12 Reserves 6 Carry-Dar A0 Next Year I.m.m 9U,m (et.m) (J,M .M) (f.M,m) ( (5,M,m) (M,M,m) (26.0111.0011) D
17 Next Year's Dry NOW Funding Aeairneala I,m,m 1,716,0011 2,191,01M, 2,771,440 3,I24,01011 i S,IU,m S,M,m 5,US.m U
11 Fund Balane Or (leflcit) M.M (I.m,m) (3,M,ml (5,f19,m) (9.M.m) ( (9,M/,m) (SI,SU,m) (U,116,m) II
z:xzzr_::: .-.--..:zza :::_:-.::: z a•a••••••. c:zxzzzzz: • -.--xx:_v •••----•.•• ••••••-.---
CM11AL IRKS)
15 AmrM,1 Mrry-Oaer Irn Last Yur - 91IM,m 16,127.040 I,M.m M,m (6,4141) ( 9,/30,0go (IN,m) 9,In,M Is
........... .........
REVEIM
16 Ca stradia0 Grants 517,m 113,010 670,000 678,00 6M,M ( 2,M,m IIJ,m 2,717,00) 14
17 fees: fanatia0 m,WO M,M 600,00 600.000 M,OM 3,m,m S,m,m 6,00.000 Il
18 Other M,m 32,00) M,m 36.000 M,m i IM,m 2M,m M,m 11
19 Ale a1 Capacity Right, M,M 57.00 921,000 061,040 30,04M 2.104,00 IA,m 2.3N.M 19
20 Unrest I Riscelhmws lane 693,m 523,M IM,m ,33.m 0 ( 1,07,m 0 1,111,010 M
21 Other Iron 31 M,m 5,I00,000 71IM.M 2.M,M U,176,m 18,116,m 21
........... ....._._. ..._-..... .. ...._.... ( ........... ------_--- ._.------
22 TOTAL REVERSE 5,112,000, 6,MIM 9.M7,m I.UI.M I,M,M i U.MI,m 31169.m 31.110.00 22
........... ..._..._. .....�_. _.......� ...._.._ ( —__.... ----------- ---...._.
E3 TOTAL AVAILABLE FUNDING 15,202.000 16,152,m Il.nl.m S.IN.m I.M.m E U.oll.m 2,M,m 10,m,m 23
........... ..-------- .._...._. ------- _...__ . _...._-- ----------- ...........
UGEMITMES
21 Slurs at Joint North Irawal plant I,M1.m 6,/M,m S,M,m 2.6W.m 11311,000 ! 28.215,m 1,203,00) 2S,SI/,m 21
25 District Collation Sy51a M,M 5,70,M 7,2251m 2,015,000 7S,m i 16,00s,m 6,200,6011 22,21 ,m 25
26 Nowwrsenol lgreennl payments 100.m IW.m IW,OM I,m,m 2.m,m 3,M,m 26
27 DAMY Emadilures III,MO III,m III,m 27
M TOTAL M9MIIMES S.OM,m 12,210,0,A) U,273.M S.M.m I.DI,m U,SM,m II,M,m M,MI,m M
29 DAN".,1 Dat,V-AN, to Nest Year Igle,m I.M,M M,m (6.m) (M,M) ( (IU.m) (I,IM,m) Il.m.ml M
CO3NTV MUTATION 0ISTRICT No. IT 611110
SIAIENEN7 OF MMt1ED CASH FLOW P.O.2
FISCAL YEARS I N1.88 TNAOGR 1996-97
M-931
LINE 1M1-so 1906-19 IM9-90 1910.91 1911-97 5-Year TOTAL 159/•p 10•Yur IDEAL LOSE
--•- ----... ....... ....... ....... ...... ...._..__ ._....._. .__.-...._ _..
END MO(3)
M Rmmu L Grry-Over frea Lady Year 57,00 47.00 Ay.w 51,0M /1.M0 ) 37.00 ".MO 57.000 M
........... ........... .._...._. ......... ..___._ , -.._.-.._ ....__... __.......
IMME
31 fu Leay M.05i 0,00 IS,MO 35,OM 2S,M0 i 210,00 y5,M0 23SIM 31
2 Ivterul A NlseSllsuus Iuus 4,00 I'm 3,00 4,N1 6.00 20.00 /,MO M,OO M
1S OEM, 10rou 0 M
.......... ........... ._..-__. .._...__ __..-.... ----------- ..._...... _...._._
SC TOTAL REVENUE M,OO S3pM 11,00 39,00 11,OM 230,000 M,O01 M,MO 11
........... ........... ._..-.-_. •_-•-.__ _....._.. , ----------- ---------
M TOTAL AVAILABLE FMDINS 1M,0O IM,OO $I'm M.OD 1M,O1 3 267,00 III,MO 316.M1 35
EXPENDITURES
.....--....-
36 BON PrNNLDeI A Morose 69.00 61.M0 31,000 r 16,M0 16'm 3 1M.m 19,00 MT,MO 16
31 Other Exyen0lturu 37
._._..._ ..._..._. .......... ......... ........... ._......_ .-.-.._-- ----_.----
3N TOTAL EXPENOIIMES 69,OM 67.00 M,OO 16,M0 M,NO ) IM.NO 19.00 Ml,Oo ' M
.......... _._...... ........... ........... ........... _....__. ----------- ..........
39 Mserees A terry-M, to Put Year 11,0O 3s,M0 ALM )f,MO. M,MO M,M0 2f,M ",No 11
10 Next Year'$ Dry Period FUME"Re0uiremnts I1,MO 33,ON U'm 71,00 M,OO M,MO M,000 M,OD 10
__._... ._..._.-. ......... --------- .._.._... , --------- ._........ ....._.._
11 FUN MEAOs a (MiCit) 0 1 0 0 0 0 0 0 /1
eeae:e::eeze i xx••••e--•. ..... ............... .....e::::: ...........
fUNM0.I IMIeaIN for (near-FVN InnslOrsl
fN AO,,M$A Culy-Oysr free Lu1 Tur II,M,MO 11.162,O1M, S,410'm 121100 (31I5,110O) i II,M,OO 16.M7.OD0) 11,I13.010 12
IS TOTAL REMUR 1,166,0E0 9,525,0O 12,401,01,0 1,30,00 4,O4,O0 1 12,IM,0O M,715,00 70,110,01)0 13
........... .......... .......... ........... ...._..._ I .........0- ----------- .._...----
el TOTAL AVAILABLE ENDING 30,No,OM 21.161,00 17,611,M0 I,MI,OD I.M,Oo 3 31,9M,N0 22,346,00 M,675,0O AC
e5 TOTAL EXPENIIURES 1,131,00 15.777,10 11,6110,0O IO,M.MO I.MI,MO i O,127,MO M,IM,OO 117,1111,001) 15
........ ........... ........... .......... .......... , ------ ._-------- ........
k A.,...A Mrry-Mer M bet year 11,662,00 5,410.00 111,000 (3.I14,M0) (6,367,M) i - (6,3O,M0) (8,511,O0) 134,511,O0) 16
47 Meet you'.Dry Period FUNIM Ae0uirmOts l,M4,0A0 1,119110 2,245,O0 2,001,O0 3,211,000 s,lls,MO 5,O2,OM S,M,M Al
.......... .......... ........... ........... .._...... , .._...._. ---_----_ ------..—
48 FORD M ONTE 0 (DEFICIT) 10,311,00 3,631,M1 (2,124.M) (5,955,OM) (9,SIO,OM) i 19,50,00) (M,eM,M) (31,813,O0) 48
COUNTY SANITATION DISTRICT NO. 13
OF
ORANGE COUNTY
� `tPpolitan Or dls, ..
`s+ace 195A •l
OR9NGE COU�A
BUDGET RECOMMENDATIONS
1987- 1988 FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 13 6/17187
BUDGET RECOMMENDATIONS
1987-88 FISCAL YEAR
DISTRICT 113 DOMINANT
...................... ..... r ___________ ----------- i -_-_____-__
r r r
APPROVED ; 'RPPNOVED ) RECOBMEMDED 1
DESCRIPTION OL ACCOUNT TIRE ; BUDGET ; BUDGET BUDGET
1M-06 ; 1996-17 1987-88
r
NEONIRENF113
r
r r
r r r r
Operat0-- 6 Capital - eeetB-----
r r r r
Operating fund ; 257,000 ; 212,000 i 216,O0D ;
Accumulated Capital Outlay Fund �� 6,191,000 ; 5,522,000 s; 5,613,OM ;
Facilities Revolving Fund 862,000 935,000 ; 1,284,000 ;
----------- i ----------- r _-_--______
SUB-TOTAL OPERATING 6 CAPITAL 7,610,000 6,669,000 1,143,000
----------- i ---------- r --------___ r
TOTAL REQUIREMENTS 7,610,000 ; 6,669.000 1,143,000 ;
i
FUNOIN6 �
� r r
� r ,
r , r
r '
Operating 6 Capital Funding
__________________________
[ash 6 Investments (Appropriated ;
Reserves and Carry-Over) ; 5,760,000 ; 5.610,000 6,010,000 ;
Other Revenue ; 1,------- ; --------- a; 1.073.000
-.------- ;
7,143,000
SUB-TOTAL OPERATING 6 CAPITAL -------- ---------6,"9,000 ---------
TOTAL FUNDING I,610,O00 ; 6.669,000 1,113,000 �
$Adjusted for Inter-Fund Transfers
COUNTY SANITATION DISTRICT NO.13 Pile 1
BUDGET RECOMMENDATIONS 6/17/97
1907-00 FISCAL YEAR
FUND Ili OPERATING
_______________________________________ _ ___________ _ ___________ _ ___________ i i
ESTIMATED i
APPROVED 1 APPROVED 1 ACTUAL i RECOMMENDED
DESCRIPTION ON ACCOUNT TITLE ; BUDGET BU06ET EXPENDITURE ; BUDGET
i 1915-86 i 190-e7 i 190-07 101.0
...................................... i ----------- i ----------- i ----------- i ----------- .._..._--_-
r
OPERATING
, r
i
i
Directors' fees 3,000 ; 5,000 ; 4,500 6,000
Contractual Services ;
Share of Joint Operating $4,000 ; 54,000 ; 23,600 34.000
Trunk Maintenance 10,000 ; 10,000 ; 5,600 20,000
Manhole Line and Net Well Repairs 5.000 ; 0,000 4,400 15,000
Popp Station Maintenance 10,000 ; 10,000 ; 10,000
Permit and Ind. Waste Admin. 1,000 1,No 1,000
Connection In Admin. 26,000 ; 26,000 ; 24,600 26,000
Inter-District Sever Use Charge 2,000 2,000
Treasurer's Investment Admin and
a Banking Fees 4,000 4,000 3,80 4,000
, r
Utilities 10,000 2,000
,
User Fee Expense ! 5.000 2,30 ; 3,200
Professional Services 10,000 1,000 50 1,000
i
Printing And Publication /,000 ; 2,000 ! 10 ; 11800
Travel 6 Meeting - Directors 1,000 1,000 ; 400 1,000
Uncollectible Accounts 1,D0 1,000 ; 1.000
TOTAL OPERATING 141,w 116,000 ; 69,900 126,000
,
NON-OPERATING
,
-------------
,
Interest ; 1,00 1,000 4,10 ;
r r r
i
Expenses Applicable to Prior Tears 6,00 3,000 ; ; ; - ----
TOTAL NON-OPERATING 1Q010 4,000 4.700 - S.00
i -------••-- i -------""-- i ----------- i i -----------
TOTAL OPERATING 6 NON-OPERAIIMG I5I,00 ; 114,000 74,500 129,000
i ----------- -----"""' i -------..._ i i •_•__•__...
RESERVES ;
,
Appropriation for Contingencies 31,M 41,000 ; 22,00
Authorized General Reserve 16,A0 ; 57,000 ; -- ---
,
,
000
TOTAL RESERVES 106,00 98,000 0 11,A0
r
TOTAL REQUIREMENTS i 257,00 212,00 71,S0 i 216.00
COUNTY SANITATION DISTRICT WIT Page 2
BUDGET RECOMMENDATIONS 6117187
1987-89 FISCAL YEAR
FUND Its OPERATING
....................................... ----------- ----------- ----------- ----------- ----------
ESTIMATED
� I
APPROVED ; APPROVED ACTUAL { ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE i BUDGET
( 1983-06 ; 1986-87 1986-87 ; ; 1987-88
i
AVAILABLE FUNDING ;
----_____________
Cash 6 Investments
(Appropriated Reserves and
Carry-Over) 96,000 167.000 164,930 149,000
i ........... ........... i ----------- i i ..___ .....
User Fees ; 66,000 36,000 ; 33,600 i 59,000
Interest 6 Misc. Receipts ; 10,000 ; 9,000 ; 13,500 ; ; 8,000
i ----------- ----------- - ----------- , ----- --___
SUB-TOTAL 76,000 ( 65,000 66,900 ( 67,000
i ........... ----------- ----------- i i ____-""'-""
TRANSFERS ( ;
Transfer from ACO Fund ; 87,000
( ........... ( ----------- i ----------- ( ( ---- ------
T07AL AVAILABLE FUNDING 257,000 i 212,000 ( 211,730 ) 216,000
COUNTY SANITATION DISTRICT N0.13
BUDGET RECOMMENDATIONS 4/17/01
1987.98 FISCAL YEAR
FUND 113 ACCUMULATED CAPITAL OUTLAY
----------------- ----------- - ----------- - ----------- i ----------- i -----------
i ESTIMATED
APPROVED ; APPROVED ACTUAL ; ; RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE MET BUDGET ; EXPENDITURE ; BUDGET
i 1985.86 i 1986.07 1906-97 1 1987-98
....................................... i ----------- , ----------- , ----------- , ----------- , ------_____
PROJECTS AND EXPENDITURES
_________________________
Treatment Plant Expansion ; 62,000 19,010 ; 15,500 1 23.000
Appropriation for Master-Planned
Treatment Plant Facilities ; 600,000 ; 575,000 ; ; $75.000
Capacity Right Purchase from
District 2 458,000 112,000 111,811 192,000
Appropriation for Collection System
Capacity Rights Purchases 5,228,000 4,796,000 ! 4,052,000
Equity Purchase ; 141,000 ; 25,000 ; 19,531
EarthOuakelF loud Damage Reserve ; ----- ; ----O ; ; ; -1.00
----
SUB-TOTAL 6,/91,000 5,521,000 ; 176.925 ; 5,643.400
----------- i ----------- i ----------- i i -----------
Transfer to Operating fund 11,100
i ----------- ----------- i ----------- i i -- --------
TOTAL REQUIREMENTS ; 6,571,100 $1528.000 176,925 ; 5.613,000
AVAILABLE FUNDING
_________________
CasA 6 Investments
(Appropriated Reserves and
Carry-over) i S,SR,100 ( 5.053,000 ( 5,009.106 ( i 5,216,M
___••_•____ i _________•_ ----------- i i ----------
Fees Receivable
Federal and State Grants
i 13,000 i 1,000 3,100
, , r
Equity Sale to District 11 ( 3,000 ! 2,997
flow-based Equity Adjustment ( 70,000 ) 11,000 ; 10,533 ) ;
i i 1 i i
Sale of Capacity Rights ( ; ; ) 2,000
i i i i i
Joint Equity Sale 28,000
Interest and Mist. Incode ( ------- = ------- ; ------- ; ; J91,000
SUB-TOTAL 1119S,000 475,000 IB1,310 ( ( 127,000
i ----------- ) ----------- i ----------- ) i ---------__
TOTAL AVAILABLE FUNDING ( 6.578,000 ( 5,521,000 5.IM,756 ( ( S.613,000
COUNTY SANITATION DISTRICT WIT
BUDGET RECOMMENDATIONS 6117/87
1987-88 FISCAL YEAR
FUND ITS FACILITIES I EVOLVIll
_______________________________________ r ----------- , ----------- ----------- ----------- ( -----------
1 ESTIMATED _
! APPROVED APPROVED - ACTUAL { RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET ; EXPENDITURE ! ; BUDGET
' 1995-86 1986-87 1986.87 1987-82
PROJECTS AND EXPENDITURES '
-------------------------
i
Appropriation for Collection Systen
Capacity Rights Purchases 862,000 ; 935,M ; ; ; 1,200,100
,
TOTAL REQUIREMENTS 862,000 935,000 0 ) i 1,2110,001
r .
AVAILABLE FUNDING
,
,
Cash a InVestnentS
(Appropriated Reserves and i
Carry-over) 283,000 ) 390,000 370,004 705,000
,
Connection Fees 525,000 525,000 091,000 $25,000
i
Interest and Misc. Incoea ( ......' ( ...... -----0 i ------
SUB-TOTAL $79,000 ; SE5,000 ; 527,600 ( ) 579,000
( ........... ( ----------- i ........... i i -__------.-
TOTAL AVAILABLE FUNDING $62,000 935,000 091,60E ( ) 1.280,ON0
r ........... . ...........
........... . ........... . ........... . , _._._-_____
COUNTY SANITATION DISTRICT 00. 13 6j17187
SCHEDULE OF CAPACITY PURCHASES IN DISTRICTS' COLLECTION SYSTEMS
Project(Owning Districts(s)) TOTAL 1907-08 1909.89 1989-90 1990.91 1991.92 1992.93 1993 a Beyond
--------------------------- ----------- - ----------- ----------- ----------- ----------- ----------- ----------- -------------
Santa Ana River Interceptor (2) 6.061,000 192,000 423,000 332,000 283,000 369,000 410,000 4,052,000
,
South Santa Ana River Interceptor (2) - 901,000 ; 110,000 140,000 66,000 208,000 383,000
i
Richfield Subtrunk (2) 39,000 ; 7,000 32,000
,
,
Kellogg Subtrunk (2) 24,000 i 2,000 5,000 3,000 14,000
i
Imperial Interceptor (2) 4S,000 - 16,000 4,000 25.000
,
Taft Interceptor (2) 316,000 ; 42,000 22,000 46,000 48,000 158,000
Carbon Canyon Interceptor (2) 6,087,000 ; 372,000 5,715,000
Fullerton-Brea (2). Orangethorps (2 a 3),
Knott 6 Interplant (2, 3 6 11)
Interceptors 3,136,000 ; 346,000 2,790,000
Sunflower a District I Interceptors (1,71 4,131,000 ; 166,000 709,000 459,000 2,795,000
GRAND TOTAL 20.746,000 ; 192,000 591,000 484,000 447,000 1,216,000 1,850,000 1S,S64,000
MNTV MUTATION DISTRICT NO. I3 6/I7/87
STATEMENT N PROJECTED CAN FLOW Pepe 1
FISCAL ALAN 19B7-88 THOUGH 1996-91
leems/
TINE I99I.09 1910-89 1909-90 1990.91 MI-92 5-Yur Tout 1996-97 10 Year Total LINE
.... ------- ------- ------- ------- ------- ------------ ------------ ------------- ..--
OPERATIM FUND
I Rnerws A Gary-On, Ru lest Yur 145,000 97,000 N,ON (12,00) 159.RAW I i 169,ON (109,00) 169.00 1
........... ........... ........... ........... ........... i ----------- ------------ ............
REHM[
2 9Ufa of It In Alloutlan 0 0 2
3 Fen 59.N0 93.000 121,000 149.000 I11.00D 599,0" 1,063,N0 1,642,00 3
e Intnnt L Nisc.11 news INeee 6.00 6,00 1.000 0 0 1 13,M0 0 13.00 6
5 Other Re9we 0 0 5
----------- ----------- ----------- ---......-- .......---- ----------- ------------ ------------
6 TOTAL REVENUE 61,ND 97,00 122,00 149.000 I11,Ow 612,M0 1,043.00 1,6%.000 6
----- ----------- ----------- ----------- ----------- - ----------- ------------ ------------
1 TOTAL AVAILABLE PLANNING 216,000 184.000 1M,OM 131.000 lie.in I 761,000 936,N0 1,MC,000 J
-.--.----•- ----------- ----------- ----------- ----------- - ----------- ------------ ------------
EXPENDITURES
8 SMre of Joint Barka N 10 36,0N 39,000 65,000 $2.000 59.M0 229,000 662,E0 611.000 8
9 Collecti.A SyMtn A{0 age Other Open 95.00 109,OM 125,00 116,ND 166.ON I 6J9.000 1,DO,ON 1,9J9,M0 9
10 Other EXgNSWres 0 0 10
-- ----------- ----------- ----------- ----------- ------------ ------------
11 TOTAL EXPENDITURES 125,00 101000 I1g0N 316,000 21S,000 I 60,000 1,752.000 216M,OM IT
----------- ----------- ----------' ........... ----------- ----------- ------------ -----------
12 Beurw.6 Carry-Over to Neel Year 81,M0 36,N0 (12,00) (59,oM) (101,0n) i (107,000) (816,0110) (816,000) IX
13 Next Year's Dry Period fundSM RPwireasnls 65.000 16,00 65,w0 90,N0 113.000 1 113.000 2N,ON 2N,ON 13
----------- ----------- ----------- ----------- ----------- 1 ----------- ------------ ---------_--
le Total Mlawe or (Deficit) 22.00 (n.W01 (N.000) (IS1,M0) (220,000) i 1880.000) (1.016,00) (1,011,000) Is
CAPITAL fUND(S)
---------------
IS Reuryn 6 Carry-veer Fro.Last Yur 5,921.000 6.112,000 11010.000 1,S91,000 B.M3.M0 5,921.M0 6,464.00 5,921.00 15
........... ........... ........... ........... ........... ............ ............ ............
REVENUE
16 Comtrudion 6...is 3.000 C,MO 6,000 6.N0 IS,ND Man 16
Il fees; Conn.tios 525.000 505,ND 505.000 505,000 505,000 1 2,545.000 2,525,00 5,010,000 Il
18 Other 0 0 10
19 5.1.el Capacity Rights 2.00 $.an 1,000 I,MO 5.90 19
M Interest 6 Miuellenn, InOM 646,00 109,4103 520,00 M0,00 571,00 3,596,000 ISO,NO 2.116,040 20
21 Other Inceee 28.000 N,NE 28,M0 21
----------- ----------- ----------- ----------- ----------- ----------- ------------ ------------
22 TOTAL REVENUE 1.06.000 994,M0 1,029,04 1,016,N0 1,06,000 1 S,IM,OM 2,616,00 1.865,OM 22
----------- ----------- ----------- --......... ----------- ----------- ------------ ------------
23 TOTAL AVAILABLE FUNDING 6,921,000 7,706,000 B,IN.MO 8,665.00 9.N9.040 11,110.00 IO,iXO,NO 13,7061000 23
----------- ----------- ----------- ----------- ----------- ----------- ------------ ------------
EXPEU0I7NES
N $here of loini Whek, TrulOnt Item 93,0011 37,000 32,00 I5,00 7,000 i 116,00 18,00 132,000 24
25 District Co11AcH9n Systea 192,00 591,ON 686,00 661,000 1,218,0110 2,932,00 I1,814,OM 90,166,000 15
26 Otte hMndituns - D 0 N
•--•------- ----------- --......... ----------- ----------- - ----------- ------------ ------------
21 TOTAL EXPINDIIMES 215,000 628,ON $16,00 662,00 I,MS,MD 3,046.00 11,032,ON 20,971,00 21
........... ........... ........... ........... ...'.---.-- , ----------- ............ ---.-__._---
2e 911.11.1 B Cerry-on, to Meet Year 6,712.000 7,070,00 11591.000 8,2MILN0 8.06000 0,06,00 (1,092,000) (7,02,000) 20
COUNTY SANITATION DISTRICT NO. 11 6/I1/11
MATERIAL Of SUBJECTED CASH BLOW RAN 0
FISCAL YEARS 1981-08 INROU6R 1996-97
IM 9J/
LINE I911-10 1 - --- 0 . 1991-M YTw 1MA1 19M- 10IW IOMI lll[- - ...... .......
--
BOND BMD(S)
M Reamer I arp-ONer Bra. Lnl For 0 0 0 1 M
----------- ----------- ----------- ......_... ._-_--- ---------- ......------ ............
REVENUE
0 1. Lon 0 M
31 IAlarasl a Nisalhneous Inaaa 0 0 6 0 0 0 31
31 OEM, IAan M
-----..... "_.-..._. ._..___ ._._.._. �.._- i __..._.. -----__--- ---_-------
33 Total REVENUE 0 a 1 0 0 0 0 36
._._.__. .......... ..._......
a TOTAL AVAILABLE FUNDING 0 0 0 0 0 6 0 M
....._.... ........... .........« ---------
EXPENDITURES
33 SAYS M1nial 3 Intarnt - 0 M
36 Olnr Eo odiWns 36
3) INTEL EXPEADIIUMS 0 1 0 e 0 ) 0 0 37
.._«..._ -.._..__ _......_. _-«.... .._�._. .__....« ----------- -----__---
IN Refer..I arp-Mar a most Ynr 0 0 1 0 1 0 0 3B
39 Ma year's Dry FoLM RUMIM Re0uifannls 0 1 a 0 0 0 0 M
60 IVAN MI.M ar (CREWE) 1 e 0 0 0 0 0 0
-------nxz asat.... ....z:r;r..x ...-..::z:n :n:a:a�• ...s--z a-:-.--:a: ......nnn
MNMAY (Adjusted SAY 1.1 r-fami Irwan)
61 Antra I Carry-Onr free Last Ynr MO,OM 6,M9,OM 7,114.000 7,519,M0 1,166,0M i 6,0M,000 1,151.000 6,070,M0 /1
M TOTAL REVENUE 1,013,000 I,4111,001 1,151,000 1,113,00 I,20,0O i 51001,000 3.719,M0 9,SM,000 13
..«------- ----------- ----------- ----------- ---....... ) ........... ------------ ----....----
03 IOTAL AVAILABLE FMDIM 7,103,01111 7.1",M0 /1165.0D B,M1,O0 9107,0O i 11,071.00 11.676,010 IS,SM,000 6J
66 7019 EXFMDIIMM 366,00 /16,MD 6M,OM 651.000 I,OM.10 0 3,916,010 19,3N,OM 13,6M,OM 66
_......... ........... ........... ........... ..._...... .......... .......... ...........
65 on..I arry-0+11 a Not Ynr, 6,1M,M0 1,114.00 1,579,0O 0,161,000 I,M1,M1 i 7,M1,M0 (I,1M,OM) (1,9M,0M) AB
66 Nast Year's Dry Pmod aAOin Re0uirnnls 65,OM 16,M0 15,0O 91,000 113.001 i lii.W M1,0O 329,001 M
.......... ........... _......... ........... ..._...... i .......... ............ ..__..._.
47 FUND BALANCE OR(DEFICIT) 61IN•MO I,MO,OM 11694,0O B,W,OM I,M1,006 7,I44,00 1I,I36,0M) (I,136. M) 47
COUNTY SANITATION DISTRICT NO. 14
OF
ORANGE COUNTY
ITATION
�A `toVolitan O r
Z e a ''9P
.,itj
S'llce
0�9NGE CO
UNC
BUDGET RECOMMENDATIONS
1987-1988 FISCAL YEAR
COUNTY SANITATION DISTRICT NO. 16 6/17187
BUDGET RECOMMENDATIONS
1987.88 FISCAL YEAR
DISTRICT 114 SUMMARY
_______________________________________ i ----------- ----------- i "".."... i
� APPROVED APPROVED ; RECOMMENDED ;
DESCRIPTION OR ACCOUNT TITLE ) BUDGET BUDGET i BUDGET
1925-86 1986-87 1987-98 ;
_______________________________________ i ----------- ----------- ) .--.------- r
• i i i i
REQUIREMENTS
------------
r r r r
Operating 6 Capital Requirements
................................
Operating Fund i 36,000 ; 461,000 ; 14,000,000 ;
Accumulated Capital Outlay Fund 25,562,000 ; 21,622,000 ; 4,598,000 ;
----------- ----------- -----------
SUB-TOTAL OPERATING 6 CAPITAL 25,598,000 22,063,000 i 18,598,000
i ----------- i •-----•---- i -----______
TOTAL REQUIREMENT$ 25,598,000 i 22,083,000 18,598,000
FUNDING ; ,
Operating 6 Capital Funding
---------------------------
Cash 6 Investments (Appropriated
Reserves and Carry-Over) 464,000 76,000 13,070,000 ;
Other Revenue 25,134,000 ; 22,007,000 5,520,000
i ----------- i ----------- i -----____-_ ,
SUBTOTAL OPERATING t CAPITAL ) 25,598,000 ) 22,003,000 18,598,000
i ----------- i ----------- i ----______- i
TOTAL FUNDING 25,598,000 22,083,000 18,598,000 ;
COUNTY SANITATION DISTRICT NO.Ia Page 1
BUDGET RECOMMENDATIO35 6/17/81
1987-88 FISCAL YEAR
FUND 114 OPERATING
. ....................................... ........... ........... i ----------- i ----------- i -------.-.-
i ESTIMATED
APPROVED APPROVED ACTUAL ' RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET EXPENDITURE ; BUGGET
1985-06 1986•67 i 1186-87 ' 1907-19
OPERATING
Director's fees ; 31000 5,000 I 5,100 6,500
Contractual Services
Share of Joint Operating ; 20,000 253,400 ; 288,100 619,000
trunk Maintenance 2,000 23,000 ; 600 100,000
Pump Station Maintenance ; ; 27,000 1,000 ; 86,000
Inter-district Service Charge ; 00,000
,
Persil 6 Ind. Waste Admin. ; 2,000 1,000 ; ; 2,000
Treasurer's Investment Ads. ;
6 Banking Fees i 1,000 ; 5,600 { 85,000
Utilities ; IS,ODO 16,600 ; ; 20,000
i i i i i
Professional Services ; ;. 10,000 ; S00 ; ; 10,000
Printing 6 Publication ; 500 2,000 ; 500 ; 1,500
Travel 6 Meeting - Directors Soo 1,000 ; 200 1,000
TOTAL OPERATING 30,000 393,000 319,200 931,000
i ----------- ----------- i ........... i i ----..-.---
NON-OPERATING
-------------
Expenses Applicable to Prior Years i 1,000 i i i 1,000
i ........... i,---..------ i ---------•- i i --------- -
TOTAL NON-OPERATING 0 1,006 i 0 i 1,000
----------- ----------- i ----------- i i -..-....---
TOTAL OPERATING 6 RON-OPERATING 30,000 i 384,000 i 319,200 i i 932,000
----------- i ----------- i ----------- i i .-.--------
i
RESERVES i
Appropriation for Contingencies 6,000 i 77,000 i i i 106,000
IRND Investment Deposit and
Interest Earnings ; ; ; 12,496,000 ; ; 12,882,000
........... i ----------- i ----------- i i - ---------
TOTAL RESERVES i 6,"0 17,000 12,496,000 i 13,068,000
TOTAL REQUIREMENTS 36,000 i 461,000 12,815,200 14,000,000
COUNTY SANITATION DISTRICT ROM Page 2
BUDGET RECOMMENDATIONS 6/17181
1987-88 FISCAL YEAR
FUND 114 OPERATING
_______________________________________ i ----------- ----------- ----------- ( ----------- i -_____-----
ESTIMATED ;
APPROVED APPROVED ; ACTUAL ; ; RECOMNEMDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET ; EIPENDITURE i BUDGET
1985-86 1986-87 1986-87 ; ; 1987-80
i
AVAILABLE FUNDING
Cash 6 Investments
(Appropriated Reserves and
Carry-Over) ( ( 9,000 i 135,334 ( ( 12,729,000
----------- - ----------- ----------- - i -----.----_
Fees ; 36,000 ; 449,000 ; 480,000 ; ; 357,000
( ) ,
Interest 6 Nisc. Receipts ; ; 3,000 ; 529,500 ; ; 914,000
----------- - ----------- - ----------- -----------
SUB-TOTAL 36,000 452,000 1,009,500 1,271.000
----------- ----------- ----------- - , ----'-----
TOTAL AVAILABLE FUNDING 36,000 ( 461,000 1,144,034 14,000,000
COUNTY SANITATION DISTRICT NO.14 Page I
BUDGET RECOMMENDATIONS 6/17/87
1981-88 FISCAL YEAR
FUND 114 ACCUMULATED CAPITAL OUTLAY
....................................... . ........... ........... i ----------- ---------- , ___._.__-__
ESTIMATED
APPROVED APPROVED ACTUAL ' RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET :EXPENDITURES BUDGET
1905-86 1986-87 1906-81 ' 1987-88
,
TREATMENT PLANT PROJECTS/EXPENDITURES
,
Treatment Plant Expansion ; 1,943,000 2,863,000 1,881,700 ; ; 3,448,000
� � r
Purchase QI Treatment Plant
Capacity 14,940,000 ' 14,940,000 14,940,000
i
Purchase of Pro-rala Share
of Real Property i 2,326,000 2,326,000 2,326,000
District 14 Formation r� 147,000 ; 22,000
Earthquake/Flood Damage Reserve ; ------ ------0 ; ' ------0
r
,
SUB-TOTAL 19,418,000 20,2SO,000 19.169,700 3,627.000
--STRICT COLLECTION SYSTEM PROJECTS
-----------------------------------
AND EXPENDITURES
----------------
Main Street Trunk Seiner t,100,000
Main Street Pump Station 1,950,000 1,170,000 1,400,000 30.001
,
Yon Xanan Trunk Sewer 1,704,000 '
,
,
Transfer to District 7
Facilities Revolving fund 290,000
, r r
Districts 6, 7 L 14 Relief System 100,000 ; 20,000 ; N1,100
i
, r
Appropriation for District facilities
Improvements and Extensions 100,000 102,000 100,000
i i i i i
SUB40TAL ; 6,144,000 1,372,000 1,420,000 971,000
TOTAL REQUIREMENTS 25,562,000 21,622,000 20,589,700 4,598,000
COUNTY SANITATION DISTRICT NO.I/ Page 2
BUDGET RECOMNENDATIONS 6/17101
1987-08 FISCAL YEAR
FUND Ill ACCUMULATED CAPITAL OUTLAY
--------------------------------------- i ----------- i ........... i _—•_•_____ i "'""'---- -----------
i i i ESTINATE/
( APPROVED ( APPROVED ( ACTUAL RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET ( MET :EXPENDITURES BUDGET
( 19Bs-66 ( 1916•61 ( 1916-01 ( ) 1987-88
- ------------------------------------- i ----------- ........... i ----------- i ........... --------.--
AVAILABLE FUNDING
-----------------
Cash 1 Investments
(Appropriated Reserves and
Carry-over) ( 464,000 ; 67,000 ; 632,602 ; ; 349,000
( ........... ( ----------- ( ----------- i .----------
,
Capital Facilities Fees (IRWD) ; 7,S%,001 ; 3,606,001 ; 3,455,435 ; 3,251,000
Construction Grants ( ) 113,010 ) ( 439,000
Joint Works Equity Sale ; ; 275,000 ; 178,729 ; 256,000
r r r i
Joint Works Treatment Plant Capacity
Purchase Payments (YANG) ( 14,940,000 14,940.001 ) 14,940,BUD
r r r
Real Property Purchase
Payments (YANG) ; 2,326,000 1 2,326,000 ) 2.326,000 ) ;
Sale of Capacity Rights ; 247,000 2S5,000 ; 21,122 ; ) 259.000
Interest and Misc. Receipts ( 82,000 ; 10,000 ) 111,979 ) ( 45,000
--•-------- i '•"'-••"' ( ----------- ) ( --__-_-----
SUB-TOTAL ( 25,098,000 21,S5$,%0 ( 21,033,%$ ( ( 4,249,000
i ----------- i ----------- i ----------- i i _..._•___-•
TOTAL AVAILABLE FUNDING ( 2S,562,000 ( 21,622,000 ( 21,666,567 { ) I,5%,000
COUNTY SANITATION DISTRICT NO.10 6117/87
SCHEDULE OF DISTRICT COLLECTION SYSTEM PROJECTS
TOTAL C.I.P. 1987.18 1988.H 1909-90 1990-91 1991-92 1992-93 1993.90
........... , ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
Main Street Pump Station 7-7 (1) (a)s 2,690,000 2,660,000 30,000
i
District 6, 7 a Id Belief System (3) (b)ss 8,520,000 20,000 100,000 600,000 3,000,DOD 3100,000 1,300,000 500,000
Miscellaneous Projects (a) 700,000 ; 100,000 100,000 100,000 100.000 100,000 100,000 100,000
......._._- ,, ----------- ----------- ----------- ----------- - -------- ...-------- ----------- -----------
GRAND TOTAL ACO 11,910,000 2.680,000 230,000 700,000 3,100,000 3,100,000 1,100,000 600,000 100,000
(a) Fully Funded 1. Master-planned facilities presently under construction
(b) Partially Funded 2. Master-planned facilities presently under design
s Portions to be shared by S. Master-planned facilities scheduled for future design/construction
District No. 7
ss Portions to be shared by
District No. 6 and District No. 7
CW TV B"I"TI"DISIA1C7 NO. 11 W211"
SIATENENT a PROTECTED Co%FLU 9%e 1
FISCAL FEARS 1987-a TERM 1991-92
19E-"1
LINE I9,17-81 1911-" 1989-W IM-91 1%h% 1 I•Far Toll I/141-97 10 Fear Total LINE
..._.. ....... ....... ....... ....«. , «-......._ .-.«.«.... ._....._.-
MATINe SURD -
1 I..,.C Campers, has Last are, 12,721,000 1",406 219,000 216,0% "Excited 12,129,a% 326,"D 12,729,a% 1
....«..... .......... ........... __.._... .......... , .--------- ------------ ............
REVENE
2 $Tom o1 It Ins Allocation 2
3 7m IIA") 157.1" Ise%,"1 1,241,0" 11215,000 F.6E,"D I $1776.00 II,a2,0" 11,591,a0 I
a Inures 6 Nisallmeas lnan Slashed 16,000 16,te% logged E,00 i 9"s0e 1%,"e 11160,OW 1
5 Other Anew 0 0 1
.......... ........... ........... _......... ........... I ........... --.......... ........-...
6 1014 REVENUE 1,271,0" 1,099,400 1,218,000 I,454.00 1,67E,0" I 6,761,0" 12.117,40 19,731,000 6
_.-....... ._........ .......... ........... ........_. I -..--...-- ._......_. ...........
7 TOTAL A%1LA LE FUNDING 11140s0" 1,25.1" 11111,000 1,1"g0" 11954.0/0 19,/%.00 ",I",m ",167,e00 i
........... ........... ........... ........... ........... I ..-........ .........«. .----------.
EEERDIT%"
1 Shore of Joint Nord A 10 619,000 711,0% 811,%0 %1,0" 1,081,0" I 4,171,101 1.1%,a% 12,567,Wd B
9 Collection Aysde A A 0 and Other Doer. 313,00 30,0" 414,"0 116,0" %d,a" I 2,111,0" 1,218,0" 6,3%,00 9
10 Other dunditua a 0 10
........... ........... ........«. ......... ......«... I _.-..__. ........... ..._.-..-
11 TOTAL E"EOIT"E1 9Eg0" 1s071,"e 1.232,"D 1,117,"0 1,630,0410 6.212,01110 12,641,0" 18.926g001, Il
........... ........... ........., .......... .........-. i __.._... ........«.. -- ---.....-
12 Alums and Corry-aa to Next Fear (Incl. IDEA Invest.) 13,e68,000 214,000 246,100 263,000 E61Oa i 1312",0% 6E,0" 1E,I61,0" 12
13 1"D laadrot Wpoitlhrnings 12,052,000 12,1821010 12,182,010 I3
.._._..... _-.._.-.. .......... ........... --------- ; -------«.. ----------- -----------
tea Fund Islam or I%ficit) 106.0" 218,00 216,0% 283.0011 E6,"O , 3N6,%0 659,"o 659ga% tea
C"ITAL""11)
IS «Reserves S Corr"or Fro Lest Year - 319,%a 920g0011 I1517,041, 1.971.00 I,E3g0" i E9,0% 636.000 319,"e IS
........... .._....... .......... ........... .......... I ----------- ------------ ------------
AEVEIUE
16 Cootrutlan&ass 1%,%T %,%0 571,0" 514,1100 311,0" i 2s256,040 96,W0 2.3E,00 16
17 Fen: I"D - 3,"1.WD 61583,OW 1156I,000 1.329g000 I,161,0" 21,091.0" 3g266,0% 25,157,00 17
18 Other 0 0 18
19 his Of Capacity Right, S59g0% 48.01ad 45,400 7E.o" 25,000 1,119,000 m,eah 1.2%s0" 19
20 Interest A 1tuellauos lace 15,"0 87."0 12S,000 118,00 ".o% I 145,a% 235.000 6%,Oa NO
21 Other lase "6.%0 296."0 2%,0" 21
........... ........... ........... ........... ........... ........... ............ ...........
22 TOTAL REVENUE 4,249.00 6,814,00 B,I".M 4g7"s%0 1,0E,000 25.957,010 3.113.000 29,670.00 22
.......... ........... ........... .......... ........... I ----------- ...------... -- ---------
25 TOTAL AWIL"LE WNUING 1,5%.000 7.7E,100 9.06,"0 6,724g%1 3,178.0" s ",306.m 4,319,0% 30,019,010 25
........... ........... ........... ........... ........... I ........... ------------ ------------
EDPENDIIURES
21 Shan at Joint Narta Tres dent Plat 31140.00 6.47,100 4,711."d 2,279,141) 1,142.a% 17,I10,0NG 2.7"'0" 19.%g,000 21
IS District Collection Same 230,000 %0,000 3,10,"d .3,1"s0% 1,140,0" 1 6,330,g" MITI 9,2",000 2S
26 Other Eepeaditare i 0 a "
........... ........... ........... ........... .--------- I ........... ............ ...........
27 TOTAL EN"N"TWES I,6",0" A,I81,0" 7.884,1140 5.379.00 2,542.000 I 25,670.000 3,1",0% 29,150,0" "
........... ........... ........... ........... ........... . ........... ............ ............
" A...met A Corry-over to eel Far 9",ONTO 1,511.000 11971p" I,E5,0" 6E,a" W,0" 169,001 169s%0 21
OONTY SHIIATION DISTRICT NO. 14 dltlln
STATEMENT OF PROTECTED Code FLY Pip 2
FISCAL YEARS 1981-0 IUOUCV 1991.12
TIRE ... .
HIM." 10 9.9J/
....... .... .... .. 190... ...... 1•Ine .l... ... Vast . PINE....
BOND FUNDO) I
............ I
29 Returns C Carry-W.r free Lost Year 0 0 0 0 I 29
._....._. .......... ........... ___---- � __.._... ...._..._. _�...__
REVENUE I
SO Per Leos I 0 0
31 Interm 1 H1.111Alne [onto 0 0 0 0 1 0 0 11
32 Other Imeee.' I 32
33 TOTAL REVENGE 0 0 0 0 1 j 1 Y
_......... ........... .......... .......... ........... I ......._.. .......... ..........
34 TOTAL AVAILABLE FMIU 0 0 0 0 .1 j 0 33
.......... .......... ........... ........... .......__ I ........... ------------ ...........
amormis .
35 and Pr3ee10.1 6 Interest i 0 0
M Ot0er Exnndltures 36
........... ........... ........... ........... .._...._. I .._...._. ............ ...__..._
37 TOTAL SUBCULTURES 0 R 0 0 0 1 0' IF
........... ........... ........... ........... ........... I .__...._. ............ ............
30 Moms a Carry-Over to but I., 0 0 0 0 0 1 0 Y
39 Next Four's Dry Posted funding ReOulreunls 0 0 0 0 0 i 0 39 .
........... ........... ........... ........... ........... I ........... ------.---- ---_..-----
AO fund bleat or (Dofi011) 0 0 0 0 0 1 0 60
nnnnns. ...x.... n.
SHORT (Adjusted for later-fund Tnmfers) j
CI Amoran L hrrY'Onr free mLL Year 13,01,00 1,106,00 1,761,000 2,217.000 1,621,00 1 13,071,00 962.00 13,078,00 11
12 TOTAL REVENUE I,S0.001 7,911.00 9,312.000 6,207,000 S.M.0O j 32,718.00 16.60,00 49,Oe,O0 42
.......... ........... ........... ........... ........... I ----------- ------------ ---.._------
A3 TOTAL AVAILABLE fVUU9 11,191,00 9,011.000 11,333.00 1,424.00 5,134,001 I 65,791,0O 111652,000 6214861000 63
AC TOTAL EXPENDITURES 1,614.000 1,MICH 9,1u.M 61196,00 1.172,000 I 31."2.000 16,124,010 11,076.000 66
........... .......... ........... ........... .......... I ....---.... ............ ............
45 enter...6 Cury-Ooe to Neel Year 13.90910O 1.761.000 2,211.00 1,628.00 962,00 I U.866,000 1,520,000 14.410,000 65
66 Nut Year's Dry Varied Fundim As0uirsom 12,862.40 0 0 0 0 i 12.082,00 0 12,112,00 46
........... ........... ........... ........... ........... I .......... ------------ ---...------
11 FUND BALANCE OR (DEFICIT) 1,106,400 1,101,000 2,217,000 1.621,00 MpOCO I 962,00 1,326,00 I'W'ohm 47
.znu..m r.::::x::n ........w z.......... m...nn , nmutu.z ............ ............
A P P E N D I X
THE JOINT OPERATING FUND AND CAPITAL OUTLAY
REVOLVING FUND BUDGETS WERE ADOPTED BY THE
BOARDS ON JUNE 10, 1987.
EACH DISTRICT'S RESPECTIVE SHARE HAS BEEN
INCORPORATED INTO ITS BUDGET ON THE PRECEDING
PAGES.
COUNTY SANITATION DISTRICTS
OF
ORANGE COUNTY
JOINT WORKS OPERATING BUDGETS
PNLTA7/0N
r,�i 6 „av^r�°^ oo�s9
UN
G Sinn 199\ V
R"VGE COONS
1987- 1988 FISCAL YEAR
1991-®.ws amsrtc nw aREI• �l A
sl44uv GF>rrvsm+w.Ptt�alll�r l�II4ei
W 01 6A (D) CE1
II¢a B
O 1986� 3blaaFk y I� Mi.
salai¢,Pays b $12r461,W0 $I3,MIM $ ]01,OW $ 458,OW $ %2,= -Dllt ro:musaln y�nert Teel W m 958 0( ad¢lmj
b spit ie¢�ul.stilalaY
neulai:y
eue6its prlbav RvnailY xVNtie;,
Egeir aeRR1Y irsYalla]air and a L velY::wIQug eWp
' na+ha�lal¢r alx
maul aa1 mall Caste statlrn pv1a�.
2 c l'leN®1 4,142,W0 4,=,WO Ml= 123,OOD Qe=1 P--) narr>W14a9n m[]m�vJ4aaeaxl
F@iic Qll¢it: 5290,OW Im9z eels�ysi®1Po,a�i®1 c®mec.
EBiaat OD¢i� IB2,lW) llaltr0lalti indig�� Pan
Rde 4 .n.
dua Wr t&iaza�l 6aric
l]:1¢ire 540,OW tb-re uae'>�hz emlatil pffals m
$17V alas a Qell as vm uaa's:
5124/lm� 521q/tm
mscic '!00 naaml�e in ad21 a fi
mal air mlflaa cl .dm a 2Cffi
�a[.v0 ey al�d,®lll.`He°m#m uns
Fty3aglki3ali& WS,WO) ital� baeEits rf lfysimu
Falysa: 95,W0 !�m tae3t a3litiael flo4 trilaRacY
m DLstriGs.
srm.Wo
3. M4,W9 1,231,= 162,OW 331,030 S16,W0 �4$,WO: 'Rack umtx di�psal
Savia, 6D'M Pla4 2 C pmr sevia•s.E1nt
B],M 1plg :c3Tp l stuff'meil0ts
115,M: ¢=itY labaa Y ae TY baa is aarjrctial v tm PEAS
'15.m0: g��ma1]ahr mrs�l
21,D31: #FD egi�r� ug eaL,etim fea;
55 Qp: tJWl Refit 2 wQ'c
40;0W: GaKraasl ne:rtava>•saviors lvt pzfmiel M Disuids'
4. Ya.Ye a+ga"'Fas 93],000 1,3IO,W0 2A,031 M'm -1 xrdf�ill'i A >s�.
5. (tit 6 Shd} lalaal l,dll1,00D 1,8]O.OW 3W,OW �,000 m de m R iL .az.mid Ca ad mte
6. Et4:ipn Q-�q- 145,000 160,= 15,W0 15,W0 -➢ae4a mum of ha e3npm
3. _ m/ 2,136,= 2,®6,= C 'm M,= �t¢aryvr3 neutaaax ad Ettafas m E,Fe a gxXx
8. nm„d:6 Ptrdmrirt3 1,69/,OOD 11991pW Wlm 300.W0 -IIae':x in mmad¢ fS�rOe maaal s31it¢ia3.
9. lltwti¢ 6r210,0W 5r1Wr000 am,0W1 (MM (M,WOl -Plat.p.'vL �lotta�l±agl de b�laeh in trlr�m]Le(E
a1lFtaaal @^:e¢ faiLtus. Raam a rmvl aE
a}vpm_[efElclecy and tilmlY ure d:e9sFp aa:m t31re a]mm.,:lag a rE
psk�tam.
10. i�9Sf>li� l,n4,= 2r035,= M5 96,W0 321,W0 -$219,=I.. a:V.m amrlhR.ivlm pfilic liability
3,0�00�Fm/id��s{aviszrt3 me0tarts.
1L 'lbtal,but 0le<atb9 $31,445.OW $31,98 M $ 956,OW 52,S ,= $3,542AW
Pa4>ss°;
12 Feeary ad Of£2k.^. OW amm 02.0m OW
13. Cp to $33,S7,WO $33,98/,0W $ 9 lm $2,464,000 $3,490,OW
SCHEDULE I
JOINT OPERATING FUND BUDGET REVIEW & SUMMARY 4/22/86
OOMPARISON OF BUDGETED & ACTUAL EXPEND TURES & ESTIMATED CARRY-OVER
FISCAL YEAR 1987-88
(A) (B) (C) (D) (E) (F) (G)
Budget Reommended Increase Expenditures Estimated Increase Est'd Carry-Over
1986-87 Budget or 1985-86 Expenditurei or to Fiscal
1987-88 (Decrease 1986-87 ease Year 1987-88
1. Net Salaries,.Wages &
Benefits $12,487,000 $13,049,000 $ 562,000 $9,834,700 $11,432,500 $1,597,800 1,054,500
2. Odor Control & Chemical
Coagulants 4,142,000 4,870,000 728,000 2,397,700 3,105,200 707,500 1,036,800
3. Professional & Contract
Services 2,894,000 4,230,000 1,336,000 2,399,800 2,823,000 423,200 71,000
4. Equipment Charges 145,000 160,000 15,000 143,600 124,400 (19,200) 20,600
5. Repair & Maintenance
Materials & Services 2,136,000 2,886,000 750,000 2,025,100 2,358,500 333,400 (222,500)
6. Research & Monitoring 1,697,000 1,997,000 300,000 979,800 1,543,000 563,200 154,000
7. Utilities 6,230,000 5,760,000 (470r000) 4,645,600 4,651,200 5,600 1,578,800
8. Other Materials, Supplies
& Outside Services 1,714,000 2,035,000 321 000 1,277,700 1,598,100 320 9D0 115,900
9. Total Joint Operating -
Expenses $31,445,000 $34,987,000 $3,542,000 $23,704,000 $27,635,900 $3,931,900 $3,809,100
10. Revenue and Offsets 898,000 1,000,000 102,000 961.600 1,383,000 421,400 (485,000)
11. Net Joint Operating $30,547,000 $33,987,000 3 440 000 $22 742 400 $26 252,900 $3 510,500 $4 294 100
Schedule II
BUDGET RECOM ENDATIONS 4/24/87
JOINT OPERATING FUND
Fiscal Year 1987-88
ALIACATION OF JOINT OPERATING EXPENDITURES
A B C D E) F G H I J
GALLONAGE FLOWS 1987-88 FUNDING 1986-87 COMPARISON
1986-87 Estimated Estimated
District Flows Estimated 1987-88 Percent District Estimated Required District Required
No. Past Year Increase Flows of Total Contribution Carryover Funding Contribution Funding
1 9,530.15 264.01 9,794.16 MG 10.68% $3,630,000 $ 458,600 $ 3,171,400 $ 3,220,000 $ 2,810,800
2 27,723.60 259.18 27,982.78 30.53 10,376,000 1,311,000 9,065,000 9,604,000 8,384,500
3 28,608.70 755.48 29,364.18 32.08 10,903,000 1,377,500 9,525,500 10,151,000 8,861,800
5 4,803.40 75.38 4,878.78 5.32 1,808,000 228,400 1,579,600 1,555,000 1,357,400
6 4,558.85 272.35 4,831.20 5.27 1,791,000 226,300 1,564,700 1,631,000 1,424,100
7 5,964.10 338.42 6,302.52 6.87 2,335,000 295,000 2,040,000 1,863,000 1,626,800
11 6,612.35 109.89 6,722.24 7.33 2,491,000 314,800 2,176,200 2,236,000 1,952,100
13 83.95 14.87 98.82 0.10 34,000 4,300 29,700 34,000 29,300
14 978.20 690.76 1,668.96 1.82 619,000 78,200 540,800 253,000 221,400
TOTALS 88 863.30 MG 2,780.34 MG 91 643.64 [+G 100.008 $33,987,000 4,294 100 29 692 900 30 547 000 $26 668 200
JOINT RUM OPERATING BUDGETS SCHEDULE III
JOINT OPERATING/WORKING CAPITAL FUNDS Page 1 of 2
1987-88 FISCAL YEAR 4/22/87
ESTIMATED
APPROVED APPROVED EXPENDITURES RECOMMENDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET 1986-87 BUDGET
1985-86 1986-87 4th QTR EST'D 1987-88
1. SALARIES, WAGES & BENEFITS
2. Salaries & Wages 10,682,000 12,415,000 11,668,100 13,041,000
3. Employee Benefits
4. Retirement (OCERS) 2,071,000 2,417,000 11880,000 2,377,000
5. Workers' Compensation 120,000 120,000 120,000 186,000
6. Unemployment Insurance 0 25,000 25,000 25,000
7. Group Medical Insurance 663,000 803,000 800,600 861,000
8. Uniform Rental 45,000 46,000 40,600 48,000
9. TOTAL BENEFITS 2,899,000 3,411,000 2,866,200 3,497,000
10. TOTAL SAL, WAGES & BEN. 13,581,000 15,826,000 14,534,300 16,538,000
11. LESS:
Cost Allocation and
Direct Chargebacks to
CORE and Individual Dieta 2,481,000 3,339,000 3,101,800 3,489,000
12. NET JO PAYROLL 1111001000 12,487,000 11,432,500 13,049,000
13. MATERIALS, SUPPLIES & SERV.
14. Gasoline, Oil &.Diesel 265,000 265,000 215,700 265,000
15. Insurance 291,000 576,000 581,400 870,000
16. Memberships 18,000 20,000 17,200 20,000
17. Office Expense 115,000 3.15,000 98,700 120,000
18. Operating Supplies
19. Chlorine & Odor Control
,Chemicals 1,650,000 1,309,000 1,470,200 1,850,000
20. Sulfide Control 1,425,000 1,065,000 342,400 781,000
21. Chemical Coagulants 780,000 1,768,000 1,292,600 2,239,000
22. Other Operating Supplies 405,000 576,000 409,000 561,000
JOINT WORKS OPERATING BUDGETS SCHEDULE III
JOINT OPERkmm/worda G CAPITAL FUNDS Page 2 of 2
1987-88 FISCAL YEAR 4/22/87
ESTIMATED
APPROVED APPROVED EI@kDIDITURE9 RDSOMRffiIDED
DESCRIPTION OR ACCOUNT TITLE BUDGET BUDGET 1986-87 BUDGET
1985-86 1986-87 4th QTR EST'D -1987-88
23. Contractual Services 2,164,000 2,495,000 2,586,700 3,650,000
24. Professional Services 215,000 399,000 236,300 580,000
25. Printing & Publications 128,000 138,000 149,100 172,000
26. Rents & Leases - Equipment 140,000 145,000 124,400 160,Ob0
27. Repairs & Maintenance 1,790,000 2,136,000 2,358,500 2,886,000
28. Research & Monitoring 1,690,000 1,697,000 1,543,000 1,997,000
29. Travel, Meeting & Training 55,000 65,000 65,000 85,000
30. Uncollectible Accounts 2,000 2,000 2,000 2,000
31. - Utilities 5,480,000 6,230,000 4,651,200 - 5,760,000
32. Other Operating Expenses 110,000 130,000 128,700 140,000
33. Expenses Applicable to
Prior Years 50,000 50,000 54,000 50,000
34. Other Non-Operating Expense 51000 10,000 17,300 20,000
35. 'TOTAL MATERIALS, SUPPLIES &
SERVICES 16,778,000 19,191,000 16,343,400 22,208,000
36. LESS:
Cost Allocation and
Direct Chargebacks to
CORF and Individual Diets 205,000 233,000 140,000 270,000
37. NET JO MATERIALS, SUPPLIES &
SERVICES 16,573,000 18,958,000 16,203,400 21,938,000
38. TOM JO F OUIR94WM 27,673,000 31,445,000 27,635,900 34,987,000
39. LESS: Net Revenues 898,000 898,000 1,383,000 1,000,000
40. NET JO REQUIREMENTS 26,775,000 30,547,000 26,252,900 33,987,000
SCBEDOLE IV
NOTES TO JOrRr OPEILATING FOND BUDGET
1987-88 FISCAL YEAR
(a) Salaries, Wages and Benefits - See attached Schedule V for salaries and benefits
estimates and projected payroll savings.
(b) Cost Allocations and Direct Chargebacks to OMW and Individual Districts -
Represents direct labor and benefits chargebacks and cost allocatim- to the
appropriate fiord for which the work is actually performed (COEtF for work on
treatment plants' capital expansion; respective ACO or FR funds for work on
individual District's collection facilities capital expansion and Operating funds
for maintenance and repair of same). Also reflects administrative time chargeable
to self-funded insurance programs; and Industrial Waste Division and Laboratory
Division charges to respective Districts for industrial waste monitoring and
enforcement program.
(c) Net JO Payroll - This line item represents the net salaries, wages and benefits
cra geable to Joint Operating Fund for administration and maintenance/operation of
the joint works facilities, after chargebacks to other funds for services performed
by the labor pool described above in (b) .
(d) Gasoline, Oil and Fuel - This account includes gasoline, oil and diesel fuel
required to operate stationary treatment plant equipment as well as 260 pieces of
major mobile equipment such as vehicles, cranes, electric carts, etc.
(e) Insurance - Includes Board and staff out-of-county travel policy, employee fidelity
bond, all-risk (earthquake and flood) policy, fire, boiler and machinery policies.
The major elements of this account are $323,000 for $10 million in coverage provided
by the comprehensive all-risk policy and $537,000 in in-lieu premiums to increase
the reserve levels in the self-insured public liability fund pursuant to the Boards'
decision last year to fully self-insure liability risk.
(f) Memberships - Districts' memberships in Association of Metropolitan Sewerage
Agues (AMA), California Association of Sanitation Agencies (CASA) , Santa Ana
River Flood Protection Agency (SAMBA) , and Long Beach Safety Council. Current year
expenses and 1987-88 appropriations include a fee for membership in AMA's
Conference of Coastal Agencies (OCAn), which works specifically on legislative and
regulatory matters relative to ocean disposal issues.
(g) Office Expense - This account includes supplies, forms, small office equipment,
drafting materials and postage for all departments.
(h) Chlorine a Odor Control Chemicals - The Districts presently use chlorine and sodium
hydroxide (caustic soda) as primary odor control chemicals in the treatment plants.
The unit cost of bulk chlorine recently increased from $174/ton to $210/ton, and
with increased usage required to accommodate increased flaws being received at both
plants, the total cost of chlorine is expected to increase by $540,000 over 1986-87
levels. Ferric chloride is used as a backup chemical in the event the primary
chemical distribution systems are out of service for repairs or maintenance.
Physical/chemical treatment systems will be fully installed and operational at both
plants this year, and we expect to use an additional $290,000 in ferric chloride in
Page Two SCHEDULE IV
these systems to control hydrogen sulfide emissions and improve solids removal
efficiencies in the primary basins. Caustic soda costs will stabilize due to a
price decrease and cost-sharing for the upstream dosing program with District 3.
A decrease of $82,700 in ferrous chloride, required to control hydrogen sulfide
levels in our digester gas as required by A M Rule 431.1, will be realized due to
increased usage of ferric chloride. Hydrogen peroxide is used in the sludge
dewatering facilities at both plants to control hydrogen sulfide and provide safe
working conditions for the employees operating these facilities. We expect to
reduce our usage of this chemical as well in 1987-88 by $115,000 as our use of
ferric chloride increases.
During the course of this year, we expect to optimize use of the various odor
control chemicals, but expect our overall usage levels and budget requirements to
remain high as we maintain compliance with increasingly stringent air quality
regulations.
(i) Chemical Coagulants - We expect that polymer usage levels will increase in 1987-88,
at prices for polymer continue to fall during our annual solicitation of
bids for the material. Polymer is added to the influent wastewater along with
ferric chloride via the physical/chemical treatment systems at both plants to
improve solids removal efficiencies in the primary clarifier basins. It is also
added to digested sludge prior to dewatering to cause the sludge to coagulate to
improve the sludge and water separation process.
As we discussed in the preceding description on chlorine and odor control chemical
usage, we expect a net increase of $290,000 in the cost of ferric chloride to
improve solids removal efficiencies and to control odors. Total costs for polymer
will also increase over 1986-87 levels.
(j) Other Operating Supplies - Miscellaneous items such as scrubber acids, activated
carbon, solvents, cleaners, hardware, janitorial supplies, tools, laboratory
supplies, etc. required to operate and maintain existing and expanding facilities.
(k) Contractual Services - $1,200,000 in this amount is for the gate fees for 25
loads per day of sludge to be hauled to Coyote Canyon for landfill co-disposal, and
another $1,800,000 is for hauling increased levels of waste-activated sludges and
grit and screenings to an outrof-county landfill capable of accepting these sludges
for disposal, to comply with Regional Water Quality Control Hoard limitations at the
Coyote Canyon landfill.
This amount also includes appropriations for groundskeeping services, toxics
removal services, outside laboratory services, trash pickup, plant site sweeping,
data processing system maintenance and support services, and temporary help to help
level out periodic increases in staff workload.
(1) Professional Services - Includes General Counsel, special labor counsel, CPA audit
and miscellaneous accounting, data processing, engineering and other consulting
services.
(m) Printing and Publications - Budget allows for in-house and outside reproduction
costs and reflects expanded management information system and increasingly complex
Page Three SCHEDULE IV
administrative requirements, as well as continuing demand by public and regulatory
agencies for information on Districts' activities. The continuing efforts of our
Public Information Officer (PIO) to improve our public education program on
Districts' activities is also reflected in the increased budget for this line item.
(n) Rents and Leases - This account includes cost accounting system charges to the Join
Operating Fund for Districts-owned equipment, and outside equipment rental for major
equipment used for emergency repairs. The 1987-88 allocation has been increased
slightly to reflect the increased usage levels of large equipment required over the
past four years to support major repairs and maintenance in our upgraded and
expanded facilities.
(o) Repairs and Maintenance - This item, which is for parts and services for repair of
plant facilities, reflects an authorization to allow for routine equipment
maintenance. Should this increased allocation prove to be insufficient in the event
of major unexpected equipment failures and/or repairs, a transfer from the
unappropriated reserves of the individual Districts would be necessary to meet the
increased obligation.
(p) Research and Monitorin - $1,800,000 in this account is for contract services to
carry out the extensive ocean monitoring program required by EPA Region IX under the
provisions of the Districts' WPDES permit, which became effective April 1, 1985.
The account also includes the Districts' contribution to the Southern California
Coastal Water Research Project (SCCWRP) being conducted under a joint powers
agreement with other Southern California municipal dischargers, and also provides
for some operational research and evaluation to develop optimum operating parameters
in the treatment plants.
(q) Travel, Meetings and Training - Expanding activities of regulatory agencies have
required increased Hoard member and staff travel in recent years. It is expected
that considerable travel will continue to be required in connection with our
continued efforts to obtain an extension of our NPDFS permit conditions and the
ocean disposal sludge research project. It also includes ongoing technical training
for staff and expansion of our supervisory training program to help provide
supervisors with the necessary training to more effectively manage their Divisional
groups.
(r) Uncollectible Accounts - For miscellaneous accounts that are determined by the
General Counsel and Director of Finance to be unoollectible.
(a) Utilities - The $4.7 million allocation for. purchased power in this item reflects
a $500,000 reduction from 1986-87 budgeted levels due to construction delays for
major projects because of difficulties experienced in obtaining AQMD permits.
(t) Other Operating Expenses - Expenses not chargeable elsewhere, such as freight and
miscellaneous items.
(u) Expenses Applicable to Prior Years - Represents adjustments to an operating or
non-operating account balance from the previous year(s) .
(v) Other Non-Operating Expenses - Miscellaneous items not chargeable elsewhere.
Page Four SCHEDULE IV
(w) Cost Allocation and Direct Chaz ebacks to CORP and Individual Districts - For
materials, supplies and services cost allocation and chargebacks for same purposes
as described above under (b) .
M Net JO Materials Sul lies and Services - This line item represents the net -
materials, supplies and services chargeable to the Joint operating Fund for
administration and maintenance and operation of the Joint Works Facilities, after
chargebacks to other funds.
(y) Net Revenues - Budget amount is for sales of various sewage treatment process
by-products, revenues from the wastehauler disposal facilities at Plant No. 1
sampling chargebacks to individual Districts, and miscellaneous items.
(z) Net Jo Requirements - This line item represents the net Joint Operating Requirements
after reduction of the total Joint operating requirements by the revenues generated
from sale of by-products, charges to other agencies, and other miscellaneous
operating revenues.
1
JOINT OPERATING FUND SCHEDULE v
(AND WORKING CAPITAL REVOLVING FUND) 4/22/87
PROJECTED SAIARIEC & BENEFITS
1987-88
Anticipated
At Full Payroll Recommended
Employment Savings Budget
SALARIES & WAGES 13,727,000 686,000 13 041,000 1
BENEFITS:
1. Retirement 2,502,000 125,000 2,377,000 (2a
2. Workers' Compensation 196,000 10,000 186,000 (2b
3. Unemployment Insurance 25,000 -0- 25,000 (2c
4. Group Medical
- Self-Funded 670,000 33,000 637,000 (2d
- 243 236,000 12,000 224,000
5. Uniforms 50,000 2,000 48,000 (2e
6. Total Benefits 3,679,000 182,000 3,497,000
TOTAL SAIARIRS, WAGES AND ITS 17,406,000 868,000 16,538,000
NOTES:
1) Salaries & Wages - Full employment projection based on the assumption that all 429
authorized permanent positions and the 40 Summer Work Program positions are filled as set
forth in the personnel recommendations. The Districts' current two-year FAU's with
employee groups expire in November, 1987. The projection does not include any MOD
adjustments that might be negotiated with the employee groups and approved by the Boards.
Because of our ability to sometimes temporarily minimize staffing by adjusting plant
operational modes, coupled with personnel turnover and strict controls of filling
vacancies, we have targeted our payroll cost at $16.5 million next year (4.5% over the
1986-87 budget) which will realize a payroll savings of $868,000. If, however, turnover
is lower and/or any POD adjustments cannot be funded from payroll savings, it may be
necessary to allocate additional funds from the unappropriated reserve accounts of the
individual Districts.
2) Benefits - Remarks above under Salaries and Wages re full employment of authorized
positions and MDU's also apply to benefits.
(a) Retirement - The Districts' employees are members of the Orange County Employees
Retirement System pursuant to our NOU's.
(b) Workers' Compansation - Amount includes total estimated expenditures for the
workers' compensation program set forth in detail in the enclosed Workers'
Conpensation Self-Insured Fund Budget on Schedule VI. An appropriation of $186,000
is recommended for 1987-88 to maintain the current level of accumulated reserves as
recommended by the Fiscal Policy Committee.
SCHEDULE V
Page Two
(c) Unemployment Insurance - Because of reserves credited to our account in the
State Unemployment Insurance Fund, only $15,000 in contributions were required for
the last year. The state has advised us that we can anticipate making $25,000 in
contributions in 1987-88.
(d) Group Medical - Includes both the Districts' share of employee medical plan
benefits for the prepaid RM plans and the estimated costs of the self-funded
indemnity plAn. Schedule VII details the expected costs of the self-funded plan.
The recommended budget increase reflects our increased staffing level and higher
premiums for single employees covered by the IM prepaid plan.
(a) Uniforms - This budget projection is in accordance with employee MJU's, we have
again been able to obtain favorable bids for uniform rental, and the unit costs of
uniform service have not increased for several years.
JOINT WORKS OPERATING BUDGET
WORKERS' COMPENSATION SELF-INSURED FUND SCHEDULE VI
1987.88 FISCAL YEAR 4/24/87
1986-87 1987-88
1986-87 ESTIMATED RECOMMENDED
EXPENDITURES BUDGET EXPENDITURES BUDGET
1. Salaries, Wages and Benefits 15,000 5,596 15,000
2. Benefits/Claims 125,000 110,000 125,000
S. Contractual Services 10,000 12,608 12,000
4. Legal Services 5,000 0 5,000
S. Professional Services 17,000 12,615 15,000
6. Supplies 6 Other 1,000 0 1,000
7. Sub-Total 173,000 140,819 173,000
8. Excess Loss Policy 14,000 30,634 40,000
9. Total Expenditures 187,000 171,453 213,000
REVENUES 6 RESERVES
10. In-Lieu Premiums 120,000 120,000 186,000
11. Interest 6 Miscellaneous 67,000 50,183 65,000
12. Total Revenues 187,000 170,183 251,000
12. Excess Revenue (Expenditures) 0 (11270) 38.000
13. Reserves and Transfers 666,000 629,375 628,000
14. Ending Reserves 666,000 628,105 666,000
JOINT WORKS OPERATING BUDGET SCHEDULE VII .
SELF-FUNDED HEALTH PLAN TRUST FUND 4/22/67
1987-88 FISCAL YEAR
1986-87 1987-88 1987-88
1986-87 ESTIMATED AT FULL PAYROLL RECOMMENDED
EXPENDITURES BUDGET EXPENDITURES EMPLOYMENT SAVINGS BUDGET
----------------------------------------------____________________________________________
1. Claims - Medical 665,000 711,676 702,000 (35,000) 667,000
2. Indemnity 11,000 3,622 12,000 (1,000) 11,000
S. - Dental 97,000 81,405 96,000 (5,0001 91,000
4. Sub-Total 773,000 796,703 810,000 (41,000) 769,000
5. Contractual Services 41,000 32,426 38,000 (2,000) 36,000
6. Stop Loss Insurance 56,000 60,121 84,000 (4,000) 80,000
7. Total Expenditures 870,000 889,250 932,000 (47,000) 885,000
REVENUES 6 RESERVES
8. In-Lieu Premiums From - CSDOC 661,000 536,475 670,000 (33,000) 637,000
- Employee 719000 61,503 71,000 (4,000) 67,000
9. Interest 6 Miscellaneous 0 6,210 0 0 0
10. Reimburse from Stop Loss Insurance 1D0,000 116,559 0 0 0
It. Total Revenue 832,000 720,747 741,000 (37,000) 704,000
12. Excess Revenue (Expenditures) (38,000) (168,503) (191,000) 10,000 (181,000)
13. Reserves and Transfers 38,000 168,503 191,000 (10,000) 181,000
Ending Reserves 0 0 0 0 0
• 3OINT NORMS OPERATING BUDGET
PUBLIC LIABILITY SELF-INSURED FUND SCHEDULE VIII
1987-88 FISCAL YEAR 4/21/97
1986-87 1987-88
1986-87 ESTIMATED RECOMMENDED
EXPENDITURES BUDGET EXPENDITURES BUDGET
............................................................
1. Salaries, Wages and Benefits 1,000 0 1,000
2. Benefits/Claims 20,000 278,860 20,000
3. Contractual Services 5,000 6,064 8,000
4. Legal Services 17,000 23,109 25,000
S. Professional Services 1,000 1,000
6. Supplies 6 Other 1,000 1,000
7. Sub-Total 45,000 308,033 56,000
8. Excess Loss Policy
9. Total Expenditures 45,000 308,033 56,000
REVENUES 6 RESERVES
10. In-Lieu Premiums 258,000 265,500 537,000
11. Interest 6 Miscellaneous 50,000 58,946 07,000
12. Allocation to Other Funds 10,000 12,579 10,000
12. Total Revenues 318,000 337,025 634,000
12. Excess Revenue (Expenditures) 0 28,992 . 578,000
13. Reserves and Transfers 652,000 643,055 672,000
14. Ending Reserves 652,000 672,047 1,250,000
COUNTY SANITATION DISTRICTS
OF
ORANGE COUNTY
JOINT WORKS CAPITAL OUTLAY
REVOLVING FUND
01TATION
P°litan �r°�
o\to I fT
�9
°e I954
RgNCE co�N
1987- 1988 FISCAL YEAR
93MY A
3/13/87
(PP S.GMAY IUMIDG FLED R-V s "/87
3E4Y4bC CF EMUM' F
RD 0O4Y44ff'i4E um Fat JODT MRS Q3914i)MM
7987-88 1987-ffi FEWM9 MS
F117CEP Lck&-57
R W 7O1 L OEH HEM EIS CDfMiHE
FII9 cr F EFCE IF' FaIIIO41'D:464 FES= Rumau47Q1 TOM EEDJIR30M
1 10.37 5,979,000 5,220,000 759,000 5,339,000
2 29.05 16,750,000 14,624,000 2,126,000 14,264,000
3 31.20 17,990,000 15,706,000 2,284,000 15,451,000
5 5.15 2,%9,000 2,592,000 377,000 2,694,000
6 5.11 2,946,000 2,572,000 374,000 2,749,000
7 6.04 3,483,000 3,041,000 442,000 2,985,000
u 7.06 4,071,000 3,554,000 517,000 3,536,000
13 0.04 23,000 20,000 3,000 20,000
14 5.98 3,448,000 3,010,000 438,000 3,045,000
TOM 100.00 57,659,000 50,339,000 7,320,000 50,083,000
CAPITAL OUTLAY REVOLVIM6 FUND SCHEDULE 8'1
SUMMARY OF JOINT MORI$OONSIRUCTIN REDUIRENINTS e/20/87
1987-09 l0 1993-94
Sell Mile I ESTIMATED ; ; REOUIR50 ESTIMATED NINE BUDGETS
PROJECT i C.T.P. i HUGE[ I .......... .......... .......... .......... ........... .......... TER
TOTAL 6/SO/Il I i 1981-M i 19111-19 19111-90 i 1990-91 i 1991.1E IM-M i 1993-91 BURNS.
.......... . .......... .......... . .......... . .......... . .......... . .......... ........ ----------
AVAILABLE FWD$
CwYOV(R S RESERVES i i265,190,011 1231,554,000 181,03.00 1144,166,000 120,60 .000 1 109,195,00 193,455.WON 265,19B4O00
I
' RNFNV[9 lXfl) 10,150,0011 I 11,619,000 ! 10,I80,040 i 3,80.00 I (5,1e,000) I 9,118,00 I I0,311,040 ; )1,111,000
INTEREST 1119,16S,OW 111,110,000 14,303.000 I 10,116,000 I 8,651,000 ; 0,032,000 I 1,249.000 91,028,NC
i
TOTAL RYPILPBIE fUXe i i215,211,OW i 213,558,ale 224,164,00 i l"'Poz Dal i 121,19S,ND i e2,2N,al0 1 111,051,000 426,810,000
fI I .......... 1 ---------- I ---------- I ---------- I ---------- I .......... .......... ...........
EXPENDITURES I
.............
R. ....I FUNDED NOTICED I
1. 15 MCD top ro..d Trshaenl at PANE 2, P2-23-6,
Project tonlingeocies Closalul 2,815,ND i 2,155,000 I i 50,000 I I 50,e00
2. Ullilste Solids Processing and Disposal 40,00,0e0 I S50,00 I I 55,00m) I IG,ON,ale I 5,00,M I e,N1,ON I 5,000.00 I 10,040,00 I S,S95,ON ! 19,150,000
........... I ---------- I I ---------- I ---------- I ---------- I .......... .......... I . ..... ......... ...........
TOTAL MMI FUNDED PROJECTS 12,815,01T0 I S,S1S,000 1 I 105,000 110,0100,00 I 5,100,000 I e,ND,ON I 5,0 0,N0 I 10,000.00 5,19S,000 39,N0,00e
........... I ---------- r - ---------- ---------- ---------- I ---------- .......... ---------- ---------- ......
B. NON-GRANT FUNDED PROJECTS
I. No,and Rebudgeled Major Projects I
Plant 1 I
I I
I. lead eprbs,P1-20 36,901,00 i I,141,000 i i t,NO,ON i 10,10C,040 i 11,M,ON I 5,N0,000 2,ON,NO i JS,Oal,ale
2. Additional 60 NED hiesry Facilities IB,500,00 i 50,000 S,e0,0e i IO,Oe,Oal i 9,en,000 i Ie'sio. N
S. Resbco Primary Basins I and 2, PI-231 5.000,00 I I'"O'Goo I ! 31200,000 3,2e,ON
e. Reabililtlion of Digesters 5 and 6, M-111 2,011,00 i 1,817.00 i 2e,e0 i 200,00(1
S. Rehabilitation of OI90sters T,1,9 and 10 4,e50,e0 I 750.00 I S,SN,ON 200,N0 I e,ee,0e
6. Mee Digesters It 14 and 6es Handling SYapM 16,000,01rp I 20,00 I 11300.00 ! 11ee,000 1,eN,000 ! wo,om I I 16,400.0m
1. Digester Cleaning led Rehbilitalion 9e,alp I 100,000 00,0e 1 904,ON
B. Install For Belt Filter Presses, PI-21 6.840.00 I 6,140,000 ! I 504,000 I ee,eal
9. Auxiliary Sledge Cale Storage 1,600,000 I 100,000 I 500.000 1 I100,e0 ! 1,6e,000
10, Odor Control Facilities
a. Print,Basins 3.4 and S M9els, PI-25 1,683,00 I 181,00 ! ; 1,00,e0 1 500,00 I I,SN,NO
b. TOUT Air Scrubber 9yetea, PI.26 I,I50,00 I 250,000I I,Oe,alD I sW,pe I 1,500,Oe
II. kner and Doe icatioes Service for
Support Buildings, PI-22-1 211,01)0 i 249,e0 i 28,00 i 28,00
12. Electric Reliability, PI-22 and PI-22 A,/,C 5,511,000 5,311,000 i i 20,e0 i fallen
IS. Lightner IN.By tomervtli.A Project,, J-16 I30,al0 I al,e0 I 00,000 I go,NON
le. Fallen es5/Interior Roads/Security/Landscaping 2,eSS,NO i 55,000 i i 1.00,00 i 300,000 i lal,alD I,Oal,000 2,e0,NO
0. TransiDreer Rephnanenl 220,NON i 220,M i notedly
........... I -.-.------ i -----I---- I ---------- I ---------- I ---------- I ---------- r --------- --------- -----------
SUB-TOTAL 101,212.M i 1/,951,0011 i 12,628.00 i 19,NO,Oal 31,11111,011) ; 16,NO,OM ; S,2e,000 i 3,514,1110 i 240,0111 86,211,N0
MNEODLE 8-1
m/28/BI
Page 2
ESTINATED ; ESTIMATED ; REQUIRED [SEEMED MIME MME15
PROJECT C.I.P. IMA[E ---------- ---------- ---------- ---------- ---------- ---------- FIR
TOTAL ; TWA? ; ; 1981-M 1908-89 IM-90 1990-91 ' IMI-M 1992-93 1MS-94 TOTAL
b. Plant 2
1. 'r landmarks Iepreveeents I,SM,MO ; 9.00 ! ! 90,00 ; 3,MO,MO - 3,500,000
2. Rehabilitate Primary Clarifier Basses, P2-Sip 2,919,000 2,119,Md 100,OM ; 100,000
3. Digester Oaf Collection ImprOeeeento 3,0M,M0 ; SM,MO ; 2,000.000 SOO,MO ; ; 310001000
m. ndditi0nal Lige¢ter RSAab. 1,1,L,N, and A 4,910,M0 ; 60.M0 ; 50,00 ; MQMO 2,000,000 ; 2,000,000 ; 4,050,000
S. Influent Peeping Impra"Pants S.mM,MO ; 40.040 ; I,M0,000 ; I,90,100 ; 2,M .And ; 5.400.000
6. Install five Bell filter Presses, P2.28d S.MLMO ; 5.331.M0! 250,00 ; 250,000
i. Odor Control Nailities
a. Y MMdn111 Grit Removal System
Ora Odor Silts., P2-34 3,236,MO 236.00 ; ; 2,00,00 I. M,MO a,00,000
A. Primary eanins 'A' form 'V Cmears, n-32 6,335.00 ; 335,4M ; ; 3,Mo,aM 3,OM,000 6,00,0oo
A. feel Air kluMars System, 12-33 6,171.M0 ; 517,00 ; ; 3,300,00 ; 2.500,00 ' 5,800,000
8. underground Test testannnl 305,00 ; S. M ; ; 1M. M ; 20,000 Mo.000
1, lighting East"lot aeryatlan Projects, J-16 300,0M ; 50,000 ; ; 250,000 250.000
10. Prxea Control Meputet hesitating Ispronaenls iM,MD ; 100,OM ; ; 200,00 ; mM,MO ; 600,000
11. Support facilities and Landscaping, Pt-31 S,OM,OM ; ; I,OM,MO SHIM ; 1,Mo,E01 i MERGE ; 2100.000 i S,000,000
12. Remval 0f Brit at Plant Ad. 2, 1-029 I,iM,MO ; ; 1,100,0M ; 1,700,000
is. General Process facilities
and Equipment Rehabilitation 1,5M,M4 ; 50,00) ; 5,400,01) ; 2,00,M0 7,500,000
........... .......... : .......... .......... .......... .......... : .......... .......... .
MPTDIAL 56,511,000 ; 9.321,00 ; 12,954,000 16,800,0111 ; 7,0110,000 4,000.00 ; 50,000 ; 2.000,00 4,M0,000 ; 41,250.000
.-....-...- i ---------- s ------ r ---------- r ---------- r ---------- r ---------• -•------- --------- ----------
c. Interplant and Joint
1. Electrical Reliability. J-6-2 and J-6-2 A,I,C 2,835,MO ; 2,735,000 ; I0,000 100,000
2. Oulfall poster Station, J-15 21,899,010 ; 1,589,000 ; ; 6.000,000 ; 0,10,000 ! 9.00,000 ; SM,MO ; ; 26,300,000
a. Prepurchase of Pumps and Raises. J-15A 4,512,OM ; 312,000 ; 2.000,00 ; 2,200.00 m,MO,Mo
A. Surge To.,Nodifiutions, J-I5-1 2,801,00 ; 01,000 ; ; 1,700,000 ; 300,000 ; ; 2,MO,MO
3. Central ;operation facility
a. Equipment Prepurchase, J-19A 19,0M,MO ; ; 5,500,000 ; 9,500,000 ; 2,00,000 I^00 ; 50,00 ; gM,aM ; 19,MO.MO
A. [mission Nrchase, J 196 5,000,OM ; 2,000,040 2,000,40 1,00,00 ; ' S.MO,OM
C. facility, J-19 29,000,000 ; ; 2,000,00 10,00,000 ; 14,00,00 ; 2,MD,MO ; 1,000,040 i ; ri,M0,000
m. Central Laboratory, J-Il 4,606,0M i 1M,M0 ; 1,000,M0 ; 3,MO,DM SM,MO ; ; 4.500,000
S. Again. Building Ea>mnsion at plant NA.1, J-1-4 3,124,11d0 ; 324,000 ; ; 1,100.000) i 1,000,000 ; 2,BM,OM
6. foster Pump Station Rehabilitation 10,000,OM ; ! I.MO.Mo ; 6,500,000 ; 4,500,00) 10.000.000
1. Interplant utilities 19,600,040 ; 100.000 j S.MeNal ; 6.00,000 ; 4,000,00D 1 4,500,000 ; 19,6M,000
B. Ondet9rwnd Laps 6M,aM ; 200,00 ; 40,00 600.000
........... : .......... i ; ---------- r •--------- - ---------- r ---------- ---------- r ---------- r --------- -----------
SM-IOIAL 126.961,010 ; 5,861,000 ; 22,304,000 ; 39,3810,000 31,500,000 ; 9.90,000 6,90,01M ; 9,SM,MO ; 4,500,000 123,10O,MD
----------- - ---------- - - ---------- - ---------- r ---------- , ---------- ---------- ; ---------- , .__ _._.. _-------
3M-WAL - I3EM 1 2s9.716,0M ; 33,I46.00 1 41,818.M0 ; 75.10.00 69,00.040 ; 29,Ma,OM 10,250,00 ; IS,OM,MO 8,100,000 251,62A,M0
9MEWL[PI
E@Bj81
le9e J
ESTIMATED [9111AT[D REWIRED (RII . N.UF BURETS
PROJEtT C.I.P. BUDGET .......... .......... .......... .......... .......... .......... i lYA
Total i 6130j87 ; i 1981-80 1 1981.0 ; NM-0 i 1990.91 i 1991-92 1912-93 1913.94 TOTAL
---------- ---------- ---------- r ---------- r ---------- r ---------- r ---------- r .......... ------.--- ...........
2. 0p...U.nal Capital lrojecb
a. AeduuliM plant RNA 1,185,000 i 0,000 i i 1,275,00 ; LO0.00 i 1.000,00 IA0.00 i r 1.000,00 1,000,00 ! 1,00,0E ; 7,425,000
U. Srasteant Plant N0.2 7,491,00 ; 26.00 1 ; 1.E65.00 ; 1,00,000 ; 1,000.000 1 I,00,0D 1 1,000,000 ; 1,00,000 1,000.000 1 1.465.000
c. ).let and Interplant Facilities 3,519,OW i 1,0U41 i 518.00 MISS i 500,000 S0.00 i 00,000 Sabi i 30.wo i 3,510,000
A. Eauiplent Rewasts e,IN,00 i i 1.631,00 1.50,000 1 1,00,00 1 I'm.000 1 1,000,000 1 1,00,00 1 1,00,00 i 8,131,000
.-.-.--.-.. 1 ---------- 1 .......... 1 ---------- 1 ---------- 1 ---------- 1 .......... ......... ......... ...........
SUB-10TAL - ITEM 2 26,633.00 i 11,600 i 6,10.No i 6,j",M 1 J.00.00 i 3,S0,00 i 3,500,00 3.50.00 3.00,100 1 26,546,000
........... 1 .......... 1 1 ---------- ---------- - ---------- ---------- - ---------- ---------- - -------- -----------
a. 3pe[1tl Prajects
a. ",at., PNe31IA Reports 2,461,00 i 251,00 i i 610,000 /0.NO 10.000 1 2,111,00
0. hpr...4 IruM1mt SUrdiu 1
IPApic.11(h. ical, fillnlion. Etc.) 404,000 i 179,000 1 200,000 25,000 1 225.000
a. Solids irutnnl and Blame[ Projects 206,00 i 8,000 i i 200,000 1 200.000
A. Deep Oran(BAN.ul Enlecli0n 3,416,000 i 566,000 i i 300.000 09.000 i 1511,00 i M.AIR i i 2,80,000
e. [Party ANSI., 0I.0N 1 21,0o i i S,UD 1 0.00 i 10.00 i 10.UD i N0.00 10,00 555,00
I. AND COACH... projects
1. TRUTH...STAND,
a. Rule 431.1 )SullSde) 661,000 i 41.00 i i 20,00 10.00 i 100,00) 10,0o i 10,00 i 10.00 i 100.000 6N,000
A. Dole 1110.1 (Ron) 75.00 i 50.00 i i 25,00 i 25,000
t. Air(INS...too Udalin9 103,000 i 53,00 i i S0,0o 50,000
1. Abate...t EouipOnt
e. 431.1 Sulfide Ronilarinp 117,00 i 67.00 i i 50.000 1 0,000
0. Engine RN Rodlfiulione 553,60 i 353.00 200.e0 i 20,E00
t. Flarujoacl 135.00 i 10.00 i i 35,000 1 1 55,000
9, tOniai SABAH,and Control Tatrnvae.IN 380,000 30,00 i i 50.00 i 50,00 1 0,00 0,00 i 0.f0 1 50.00 1 %.BOB i 30,Oa0
I. Bear Control Studies 1 )
I. plant No. 1 5.00 1 S,00 1 5,000
2. plant No. 2 5,00 i l i MAD i 1 5,000
i. 0cun olscAarga Coaplhnu pro9rn 61,000 19.01 i 25,000 i 2S,onm i 0.00
.--........ i ---------- 1 1 ---------- ---------- ---------- = ---------- ---------- - ----
S0901A1 - ITEM 3 9,181,000 00 1,751, i 1.7e0,00 1.900,00 1.90,00 1,10,00 350,100 250p0 150,000 i 1,60,00
----------- r ---------- 1 1 ---------- 1 ---------- 1 ---------- 1 ---------- 1 ---------- 1 ---------- 1 ---------- .-
TOTAL NM-MMI FMOED PROJECTS 325,590,000 i 34.9B6,000 i 54.554,0114) 1 81.150,00 i 15,00.00 i 31.101.01 i 13.100,000 I9,10,00 12.30,006 i 20.601,W0
........... 1 ---------- 1 ---------- 1 .......... 1 .......... .......... i ---------- . -------- ---------- ----------
C. RESIDUE FM FUIM[1WGE1 ALIUCAIIONS 6,00,00 1 3.01,00 i i 3.N400
........... .......... 1 1 ---------- 1 ---------- 1 ---------- 1 ---------- i ---------- 1 .-......-. 1 .-
JOINT RMRS CONSTRUCTION RNUIRERENI3 311,615.00 ) 38,311,0W i 1 51,659,00 1 91,150,00 0,00.00 i 0,10.00 i 19.10,DN 21,10,00 12.)[5.NO i 313.101.00
---------- 1 .......... 1 .......... 1 .......... r .......... ......---- -----------
IALANCE TO CARRY FONARD i i231,55E,00 i I01.01,00 i 146,10.00 1 10,02,00 i 104.315,00 93,455.00 93,106,00 1 93.30.00
CAPITAL OUTLAY REVOLVING FUND SCHEDULE C-1 3110/87
NEW AND REBUDGETED MINOR PROJECTS - RECLAMATION PLANT NO.1
FISCAL YEAR 1987-00
ESTIMATED ESTIMATED ESTIMATED ; ESTIMATED
WORN TOTAL PROJECT ; CONSI IN PROS ; 87-8B ; 88-89 AND ;
ORDER COST 6/30/87 BUDGET BEYOND
i r r r
1. DAF Thickener Improvements 200,000 ; 150,000 ; 50,000
2. Digester Piping Modifications 100,000 ; 100,000 ;
3. Trickling Filter Rehabilitation ; 90,000 ; 90,000 ;
6. Instrument Replacement 100,000 100,000 ;
5. Plant No. 1 Trickling Filter Rehabilitation 175,000 175,000 ;
6. Not Haler Chemical Treatment 10,000 10,000 ;
7. Paving laprovements 185,000 60,000 ; 75,000 50,000
B. Deeatering Polymer Improvements 75,000 75,000 ;
9. Misc. Small Improvement Projects ; 500,000 ; 500.000
r ----------- 1 ----------- ' ----------- ---------- ;
TOTAL PLANT NO.1 MINOR PROJECTS 1,435,000 60,000 1.275.000 100,000 'r
CAPITAL OUTLAY REVOLVING FUND SCHEDULE D-1 3112187
MEN AND RESUDGETED MINOR PROJECTS - TREATMENT PLANT NO.?
FISCAL YEAR 1967-82
ESTIMATED ; ESTIMATED ESTIMATED ESTIMATED ;
NORM TOTAL PROJECT i CONST IN PROD i 87-88 88.89 AND
ORDER COST 6130/87 1 BUDGET 1 BEYOND i
i
1. Effluent System Rehabilitation 51952-0 ; 351,000 ; 1,000 ; 100,000 250,000 ;
2. 69 NV Sub-station 125,000 25,000 100,000
S. DAF Thickener Improvements 150,000 100,000 50,000
W. Digester Piping Modifications 51935-6 ; 200.000 i 100,000 ; 100,000 ;
5. Noise Reduction ; 50,000 ; 50,000
6. Steam System Equalization 20,000 ; 20,000
7. Remove Newport City Water System 30,000 30,000
8. Insulate Steam and Not Water Piping 25,000 25,000
9. Steam System Modification 55,000 55,000
10. Hot Water Chemical Treatment System 10,000 10,000
11. Electrical Control Improvements 100,000 ; 100,000
12. Flow Control on Junction Bowes I and 8 51897-0 ; 175,000 ; ; 175,000
13. Instrumentation Improvements and Replacement ; 100,000 100,000
le. Misc. Small Improvement Projects ; 500,OD0 500,000
----------- - ----------- - ----------- - ----------
TOTAL PLANT NO.2 MINOR PROJECTS 1,091,000 26.000 1,465,DOD 400,000
,
CAPITAL OUTLAY REVOLVING FUND SCHEDULE Ed
NEW AND REBUDGETED MINOR PROJECTS - JOINT AND INTERPLANT FACILITIES 3/10/87
FISCAL YEAR 1987-88
ESTIMATED ESTIMATED ESTIMATED ESTIMATED
WORK 1 TOTAL PROJECT CORSI IN PROD 87-88 88-89 AND
ORDER COST 6130187 BUDGET 1 BEYOND
i
1. Compressed Air System at Auto Shop ; 25,000 ; ; 25,000
2. Fuel Management System 50,000 ; 50,000
S. Oil Dock and Warehouse Security, PM-115 31936-0 ; 76,000 ; 1,000 ; 75,000
/. Narshouse Expansion, Plant No.l 50,000 50,000 ;
5. Nastehauler Monitoring System, PN-101 ; 18.000 18,000
6. Interplant Microwave Link ; 200,000 200,000
7. Wisc. Small Improvement Projects 100,000 ! 100,000
i ----------- ----------- ----------- i _________- i
TOTAL JOINT OPERATIONS MINOR PROJECTS 519,000 ; 1,000 518,000 0
........... . ........... . ........... ..........
satyr F
GnW 3WiFMM DI30iE75 a'awim amity 4/2zw
cav D31umv aDfEl' [wised "/87
19"
0RJ36 fi OREM M%= O744 IBM&Im B*w CEM
Im. MM= KBRE,ED 83&MM $DIP EG" &%*I;MC EU FIX&El1 OHfR VIM
W. EERbim4m 5M-U-CD 555Q-a-CO 55563.7-W 55564.Hp 55566+7-W 55%7,J B 5556BJ M69-7 HDZr
NIN tt 941-t 18,005 18,005
Pkx� 1019DD 4,000 34,000 48,900
2210 Flra¢Dilec¢ 7,6)0 7,6D0
2220 k=ntirll 21,22D 21,22D
Padwirg 5,WD 31172) 16,721
3310 91wirtadait 91500 28,900 3,8W 11391150 230,950
3330 Plait ik,i.taiai., ®,SW 16,000 121,500 2,400 3,90D 213,300
3340 03UB7tim Fsilities 10,0W 53,385 3,430 1,50D 68,315
3350 Efedailml 87,WD 5,8W 1,210 17,500 8,90D 1,900 121,900
3360 Electriml 91800 39,000 5,2O 3,425 12,850 10,850 2,325 83,250
3370 hstnn3tatim 41,210 7,875 12,800 8,7W 111500 82,135
3510 DirWbX of ClXrdtias 1,985 1,985
3520 Onpliace 9,500 19,950 29,450
3570 Plait CLaadi 3D,400 6,000 3,40D 38,450 7,000 88,810 174,050
3580 Iahaahxies 10,W0 2,W0 2W,600 4,000 2,050 278,E50
3590 Ddstcial Wxft 19,200 6,W0 57,750 2,995 23,215 109,19D
MO DiM"of Rllb aiM
3790 Caeml Elgirea'irg 47,800 29,30D 13,000 34,796 124,890
10PL 97-M fEUM 313,300 85,400 233,260 72,85 408,910 43,175 481,450 1,638,32)
CAPITAL OUTLAY REVOLVING FUND SCHEDULE B-2
SUMMARY OF JOINT NORMS CONSTRUCTION REQUIREMENTS 4/29/B7
FISCAL YEAR 1987-08
PROPOSED ; REPLACEMENT/ ; IMPROVEMENT/ INCREASED
MOAN 87-88 RECONSTRUCT UPGRADE HYDRAULIC
ORDER BUDGET PROJECTS PROJECTS REQUIREMENTS !
r ,
r r
A. GRANT FUNDED PROJECTS ,
-------------
1. 15 MGO Improved Treatment at Plant 2, P2-23-6, 51594-0
Project Contingencies Closeout ; 50,000 ; ; 50.000
r ,
r , i
2. Ultimate Solids Processing and Disposal 54102-0,A ; 55,000 ; ; 55,000 ;
r r
r r
r i ,
i
TOTAL GRANT FUNDED PROJECTS 105,000 ; 0 105,000 0
' ----------• r ---------- r ---------- , -•_-_-_-__ 'r r , r r
B. MON-GRANT FUNDED PROJECTS
------------------------•
I. Now and Rebudgeted Major Projects
r r
a. Plant 1
r r
r i
1. Heddworks,Pl-20 53702-0 ; 4,300,000 ; ; 4,300,000
2. Additional 60 MGO Primary Facilities 500,000 500,000 ;
3. Replace Primary Basins 1 and 2, PI-23R 51911-0 3,200,000 3,200,000 ;
a. Reabilitation of Digesters 5 and 6, PM-134 51814-0 200,000 ; 200,000 ;
5. Rehabilitation of Digesters 7,8,9 and 10 ;
6. New Digesters 11-16 and Gas Handling System 200,000 ! 200,000
7. Digester Cleaning Bed Rehabilitation ; 100,000 ; 100,000
S. install Four Bell Filter Presses, PI-21 51877-0,A ; 500,000 500,000
9. Auxiliary Sludge Cake Storage ; 100,000 ; 100,000
10. Odor Control Facilities
a. Primary Basins 3,4 and 5 Covers, PI.25 $1925-0 1,000,000 ; ; 1.000.000
b. Foul Air Scrubber System, PI-26 51926-0 1,000,000 1,000,000
11. Power and Communications Service for
Support Buildings, PI-22-1 28,000 28,000
12. Electric Reliability, PI-22 and PI-22 A,B,C 53705-0 200,000 ; 200,000
13. Lighting Energy Conservation Projects, J-16 51890-0 80,000 80,000
14. Entrances/Interior Roads/Security/Landscaping 51942-0 1,000,000 1,000,000
15. Transformer Replacement 220,000 ; ; 220,000
SUBTOTAL 12,628,000 3,500,000 4,128,000 5,000,000
SCHEDULE B-2
PROPOSED REPLACEMENT/ IMPROVEMENT/ INCREASED 4/29/81
HOBR 87-88 RECONSTRUCT ; UPGRADE ; HYDRAULIC ; Page 2
ORDER BUDGET PROJECTS PROJECTS REQUIREMENTS
,
b. Plant 2
1. '[' Roadworks Improvements 500,000 ! 500,000
2. Rehabilitate Primary Clarifier Basins, P2-SIR $1912-0 100,000 100,000 ;
J. Digester Gas Collection Improvements ; 0 ;
/. Additional Digester Rehab. 1,1,L,M, and U ; 50,000 ; 50.000
S. Influent Pumping Improvements i 0
6. Install Five Belt Filter Presses, P2-28-1 51877-8 250,000 250.000 ;
7. Odor Control Facilities
a. 'B' Headworks Grit Removal System
and Odor System, P2-31 2.000,000 1,000,000 1,000,000
b. Primary Basins 'A' thru '0' Covers, P2-32 51927-0 3,000,000 3,000,000
c. Foul Air Scrubbers System, P2-33 51928-0 3,300,000 ; 3,300,000
8. Underground Tank Replacement 100.000 ; 100,000
9. Lighting Energy Conservation Projects, J-I6 51890-0 250,000 ; 250,000 ;
10. Process Control Computer Monitoring Improvements 200,000 i 200,000
11. Support Facilities and Landscaping, P2-37 ; 1,000,000 ; 1,000,000
12. Removal of Grit at Plant Be. 2, M-029 1,700,000 425.000 ; 1,275,000
13. General Process Facilities
and Equipment Rehabilitation 500,000 500,000
i ----------- i ---------- ---------- i .._-.__.._ i
SUB-TOTAL 12,950.000 1.325,000 8,350,000 3,275.000
----------- i ---------- ---------- i -----...._ i
c. Interplant and Joint
I. Electrical Reliability, J-6-2 and J-6-2 A,B,C 53701-0 100,000 100,000
2. Outfall Booster Station, J-15 53703-0 6,000,000 1,500,000 1,S00,000
a. Prepurchase of Pumps and Drives, J-15A 2.000,000 ; 500,000 1,S00,000
b. Surge Tower Modifications, J-IS-1 ; 1.700,000 500,000 ; ; 1,200,000 ;
S. Central Generation Facility
a. Equipment Prepurchase, J-19A 5,500,000 ; 5,500,000
b. Emission Purchase, J-198 2.000,000 2,000,000
C. Facility, J-19 J 2,000,000 ; ; 2,000,000
1. Central Laboratory, J-17 ; 1.000,000 ; 500,000 ; S00,000 ;
S. Admin. Building Expansion at Plant Ho.l, J-7-1 51937.0 1,800,000 1,800,000
6. Foster Pump Station Rehabilitation
7. interplant Utilities
8. Underground lank 200,000 ; 200,000
i ___________ __________ i ---------- ---._._.-_ i
SUB-TOTAL 00-
---------- = --------- ---------- ------
SUB-TOTAL - ITEP 1 ; 47,078,000 7,325,000 22,778,000 17.775,000
SCHEDULE B-2
PROPOSED ' REPLACEMENT/ 1 IMPROVEMENT/ I INCREASED ' e/29/87
WORK i 87-88 ; RECONSTRUCT ; UPGRADE ; HYDRAULIC ; Page 3
ORDER BUDGET PROJECTS PROJECTS REQUIREMENTS
r
2. Operational Capital Projects
r r ,
a. Reclamation Plant No.l 1,215,000 ; /65,000 ; 110,000 ; 100,000 �
I. Treatment Plant No.2 ; 1.465.000 1 150,000 1,215,000 100,000
c. Joint and Interplant Facilities ; 518,000 ; 50,000 ; 418,000 ; 50,000 '
d. Equipment Requests ; 1,638,000 ; 200,000 ; 1,038,000 ; A00,000
___________ _ __________ r ---------- r ,
650,000
SUB-TOTAL - ITEM 2 --------- ------- --------- -------
3. Special Projects
a. Master Plan/EIR Reports 58202-0 ; 610,000 ; 610,000 ;
b. Improved Treatment Studies 51899-0
(Physical/Chemical, Filtration, Etc.) 51902-0 200,000 200,000 ;
c. Solids Treatment and Disposal Projects 200,000 200,000
d. Deep Ocean Disposal Evaluation 51759-0 ; 400,000 ; , 300,000
e. Energy Studies 51052-0,A 5.000 ( 5,000 ;
I. AQMD Compliance Projects ; )
1. Compliance Studies
a. Rule 631.1 (Sulfides) 51859-0 ( 20,000 ; ; 20,000 ;
b. Rule 1110.1 (NOx) 25,000 ( 25,000 r
c. Air Dispersion Modeling 50,000 ; 50,000 '
2. Abatement Equipment
a. 431.1 Sulfide Monitoring 51940-0 50,000 ( 50,000
I. Engine NOx Modifications 200,000 ; ; 200,000 ;
c. Flares/BACT ; 35,000 ( 35,000
g. Chemical Handling and Control Improvements 50,000 50,000
h. Odor Control Studies
1. Plant No. 1 ; 5,000 ; ; 5,000
2. Plant No. 2 ) 5,000 ; ; S,000 ; )
I. Ocean Discharge Compliance Program 25,000 25.000
----------- ---------- i ---------- r _--___.___ r
SUB-TOTAL - ITEM 3 --------- 0 g---------
TOTAL RON-GRANT FUNDED PROJECTS 54,554,000 B,190,000 27,539,000 18.425.000
........... .......... i ---------- i ----------
JOINT NORMS CONSTRUCTION REQUIREMENTS 54,659,000 ; 8,190,000 1 28,066,000 18,425,000
r ----------- i __________ __________ i r
r
C.RESERVE FOR FUTURE BUDGET ALLOCATIONS 3.000,000 1,000,000 ; 1.000,000 1,000,000 ;
----------- i ---------- i ---------- r
TOTAL JOINT NORMS CONSTRUCTION REQUIREMENTS ; 57,659,000 ; 9,190,000 29,044,000 19,425,000
CAPITAL OUTLAY REVOLVING FUND SCHEDULE C-2 3113/87
NEW AND REBUDGETED MINOR PROJECTS - RECLAMATION PLANT NO.1
FISCAL YEAR 1987-88
PROPOSED ; REPLACEMENT/ ; INCREASED ;
NORM 87-08 RECONSTRUCTION IMPROVEMENT ; HYDRAULIC
ORDER BUDGET PROJECTS ; UPGRADE PROJECTS ; REQUIREMENTS ;
____________ ___________ _ ______________ ___________ --___ r
1. GAT Thickener 11PIDVPNNRtS 150,000 ; 150,000
2. Digester Piping Modifications J 100,000 ; 100,000 i
S. Trickling Filter Rehabilitation 90,000 90,000
a. Instrument Replacement 100,000 ; 100,000 i
S. Plant No. 1 Trickling Filter Rehabilitation 175,000 175,000
6. Hot Water Chemical Treatment 10.000 ; ; 10,000
7. Paving Improvements 75,000 ; ; 75,ODO i
B. Dematering Polymer Improvements 75.000 ; 75,000
9. Misc. Small Improvement Projects 500,000 100,000 ; 300,000 ; 100,000
TOTAL PLANT NO.1 MINOR PROJECTS 1,275.000 ; 465,000 ; 710,000 ; 100,000 ;
CAPITAL OUTLAY REVOLVING FUND SCHEDULE D-2 3112/87
NEW AND RESUDGETED MINOR PROJECTS - TREATMENT PLANT NO.2
FISCAL YEAR 19B7-88
PROPOSED REPLACEMENT/ INCREASED
WORK 87-88 BECONSIRUCTION IMPROVEMENT/ HYDRAULIC
ORDER BUDGET PROJECTS UPGRADE PROJECTS REQUIREMENTS 1
i
1. Effluent System Rehabilitation 51932-0 100,000 100,000 �
2. 69 NV Sub-station ' 100,000 100,000 ;
3. OAF Thickener Improvements 100,000 100,000 �
/. Digester Piping Modifications 51935-B 100,000 100,000 ;
5. Noise Reduction 50,000 ; 50,000
6. Steam System Equalization J 20.000 20.000
7. Remove Newport City later System 30,000 30,000 ;
B. Insulate Steam and Not later Piping 25,000 ; 25,000 ;
9. Steam System Modification ; 55,000 55,000 ;
10. Not Water Chemical Treatment System 10,000 ; 10,000
11. Electrical Control Improvements 100,000 100,000 ;
12. Flom Control on Junction Boxes I and 8 51897-0 175,000 175.000
13. Instrumentation Improvements and Replacement 100,000 50,000 ! 50,000 ;
14. Misc. Small Improvement Projects 500.000 100,000 300,000 100.000 ;
i
IOTPL PLANT 2 MINOR PROJECTS 1,/65,000 150,000 1,215,000 100,000
i
i
CAPITAL OUTLAY REVOLVING FUND SCHEDULE E-2
NEW AND REBUDGETED MINOR PROJECTS - JOINT AND INTERPLANT FACILITIES 3115/87
FISCAL YEAR 1987-88
PROPOSED REPLACEMENT/ ; INCREASED
WORN 87-88 ; RECONSTRUCTION IMPROVEMENT/ HYDRAULIC 1
ORDER BUDGET PROJECTS ; UPGRADE PROJECTS ; REQUIREMENTS
1. Compressed Air System at Auto Shop 25,000 i 25,000
2. Fuel Management System 50.000 50,000 ;
3. Oil Dock and Warehouse Security, PN-I45 51936.0 ; 75,000 i 75,000 ;
W. Warehouse Expansion, Plant No.l 50,000 ; 50,000
S. Wastehauler Monitoring System, PN-101 i 18,000 i 18,000 ;
6. Interplant Microxave Link 200,000 ; ; 200,000 ;
7. Misc. Small Improvement Projects 100,000 ; 50,000 50,000
TOTAL JOINT OPERATIONS MINOR PROJECTS ; 518,000 ; 50,000 418,000 ; 50,000
t
I
BOARDS OF DIRECTORS
County Sanitation District viler offlpa ee, 9127
of Orange County, California 10844 Ellis Avenue
Fountain Valley, Calif., 92708
Telaphvua:
Arse Code 714
JOINT BOARDS 9540-290
62-24111
AGENDA
REGULAR MEETING
JULY 8, 1987 - 7 : 30 P .M.
In accordance with the requirements of California Government
Code Section 54954.2, this agenda is posted not less than 72
hours prior to the meeting date and time above. All written
materials relating to each agenda item are available for public
inspection in the Office of the Board Secretary.
In the event any matter not listed on this agenda is
proposed to be submitted to the Boards for discussion and/or
action, it will be done in compliance with Section 54954.2, or
as set forth on a supplemental agenda posted not less than 72
hours prior to the meeting date.
( 1) Pledge of Allegiance and Invocation
( 2) Roll call
( 3 ) Appointment of Chairmen pro tem, if necessary
(4) Consideration of motion to receive and file minute excerpts
of member agencies relating to appointment of Directors , if
any. (See listing in Board Meeting folders)
( 5) Public Comments: All persons wishing to address the Boards
on specific agenda items or matters of general interest
should do so at this time. As determined by the Chairman,
speakers may be deferred until the specific item is taken
for discussion and remarks may be limited to five minutes .
( 6) The Joint Chairman, General Manager and General Counsel
present verbal reports on miscellaneous matters of general
interest to the Directors. These reports are for
information only and require no action by the Directors.
(a) Report of Joint Chairman
(b) Report of General Manager
(c) Report of General Counsel
(7) Annual election of Joint Chairman
(Nominee: Director Don E. Smith)
( 8) Annual election of Vice Joint Chairman
7/08/87 &g
(9) EACH DISTRICT
ACTION: -If no corrections or amendments are made, the
following minutes will be deemed approved as
mailed and be so ordered by the Chairman:
District 1 - June 10, 1987 regular
District 2 - June 10 , 1987 regular
District 3 - June 10, 1987 regular
District 5 - June 10, 1987 regular
District 6 - June 10 , 1987 regular
District 7 - June 10, 1987 regular
District 11 - June 10, 1987 regular
District 13 - June 10, 1987 regular
District 14 - June 10, 1987 regular
(10) ALL DISTRICTS
Cons�n of roll call vote motion ratifying payment of
claims of the joint and individual Districts as follows:
(Each Director shall be called only once and that vote will
be regarded as the same for each District represented unless
a Director expresses a desire to vote differently for any
District. ) See pages "A" and "B"
6 10 87 6/24 87
ALL DISTRICTS
Joint Operating Fund - $ 179,211.17 $ 761,865.85
Capital Outlay Revolving Fund - 1,254,923.04 510,293.98
Joint Working Capital Fund - 44,949.87 109,074.40
Self-Funded Insurance Funds - 7,076.32 2,064.20
DISTRICT NO. 1 - 18.44 1,225.80
DISTRICT NO. 2 - 2,613 ,356.20 41,339.22
DISTRICT NO. 3 - 3,248.31 12,075 .80
DISTRICT NO. 5 - 509,358.52 11,699.90
DISTRICT NO. 6 - 13,367.45 284.56
DISTRICT NO. 7 - 1,996 .52 2,465.08
DISTRICT NO. 11 - 202.45 5,702.19
DISTRICT NO. 13 - 18.44 64,890.00
DISTRICT NO. 14 - 20.00 480.00
DISTRICTS NOS. 5 & 6 JOINT - 482,489.20 3,139.80
DISTRICTS NOS. 6 & 7 JOINT - 5,467.36 32.51
DISTRICTS NOS. 7 & 14 JOINT - 1,368.39 4,557.91
$5 ,117,071.68 $1,531,191.20
-2-
7/08/87
(11) CONSENT CALENDAR - ITEMS 11(a) THROUGH 11(v)
u All matters placed on the consent calendar are
considered as not requiring discussion or further
explanation and unless any particular item is
requested to be removed from the consent calendar by
a Director, staff member, or member of the public in
attendance, there will be no separate discussion of
these items. All items on the consent calendar will
be enacted by one action approving all motions, and
casting a unanimous ballot for resolutions included
on the consent calendar. All items removed from the
consent calendar shall be considered in the regular
order of business.
Members of the public who wish to remove an item
from the consent calendar shall, upon recognition by
the chair, state their name, address and designate
by letter the item to be removed from the consent
calendar.
The Chairman will determine if any items are to be
deleted from the consent calendar.
Consideration of action to approve all agenda items
appearing on the consent calendar not specifically
removed from same, as follows:
ALL DISTRICTS
(a) Consideration of the following resolutions
authorizing and directing execution and filing of
documents necessary for Federal and State Clean
Water Grants and Loans under 33 U.S.C. ,
12551 et seq. ; Chapters 12.5, 13, 14 and 15; and
Division 7 of the California Water Code, and
providing certain assurances in connection with
the 1987-88 Joint Works Improvements and Additions:
See page "C..
District No. Resolution No.
1 87-61-1
2 87-62-2
3 87-63-3
5 87-64-5
6 87-65-6
7 87-66-7
11 87-67-11
13 87-68-13
14 87-69-14
-3-
7/08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued) '
(b) (1) Consideration of motion approving Change
Order No. 4 to the plans and specifications
for Rehabilitation of Domes and Sludge Pump
Mixing Systems for Digesters 5 and 6 at
Reclamation Plant No. 1, Job No. PW-061R-1,
authorizing an addition of $13,967.39 to the
contract with Margate Construction, 'Inc. for
sealing abandoned pipe penetrations,
miscellaneous concrete work, piping
modifications, additional piping hangers and
supports, and modification of base supports
for digester suction line at both Digesters 5
and 6 to facilitate operation and maintenance.
See page "D"
(2) Consideration of Resolution No. 87-70,
accepting Rehabilitation of Domes and Sludge
Pump Mixing Systems for Digesters 5 and 6 at
Reclamation Plant No, 1, Job No. PW-061R-1,
as complete, authorizing execution of a
Notice of Completion and approving Final
Closeout Agreement. See page E.
(c) Consideration of motion approving Change Order
No. 3 to the plans and specifications for Advanced
Primary Treatment Chemical Addition Facilities at
Plant No. 1, Job No. P1-28, and Advanced Primary
Treatment Chemical Addition Facilities at Plant
No. 2, Job No. P2-36 , authorizing an addition of
$14,196.00 to the contract with Ziebarth 8 Alper
for extension of polymer drain and construction of
protective barricade; installation of floor drain;
door modifications; and additional piping in
ferric chloride pump room, and granting a time
extension of 17 calendar days for completion of
said additional work. See page "F"
(d) Consideration of motion approving Change Order
No. 11 to the plans and specifications for
Installation of Replacement Belt Filter Presses at
Plant No. 2, Job No. P2-28-1, authorizing an
addition of $10,956.00 to the contract with
Ziebarth 8 Alper for installation of a bubbler
level system for controlling the centrifuge
centrate pumps, and modification of belt press
drains to provide necessary clearance, and granting
a time extension of 18 calendar days for completion
of said additional work. See page "G"
(e) Consideration of motion approving Change Order
No. 1 to the plans and specifications for Removal
of Grit at Plant No. 2, Specification No. M-029,
reducing the aggregate general liability insurance
requirement for bodily injury and property damage
from $3,000 ,000 to $1,000 ,000 , for a total
deduction of $5,000 .00 from the contract with
Falcon Disposal Service, Inc. See page "H"
-4-
7/08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued)
(f) Consideration of Resolution No. 87-71, approving
plans and specifications for Lighting Conservation
Facilities at Plants 1 and 2, Job No. J-16, and
authorizing the General Manager to establish the
date for receipt of bids (Tentative bid date is
August 25, 1987) . See page I.
(g) Consideration of Resolution No. 87-72, accepting
Rehabilitation of No. 4 Trickling Filter at
Reclamation Plant No. 1, Specification No. R-024,
as complete, authorizing execution of a Notice of
Completion and approving Final Closeout Agreement.
See page J.
(h) (1) Consideration of motion approving Addendum
No. 1 to the plans and specifications for
Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground
Tank Replacement at Plant No. 2,
Specification No. R-025-2, revising the
schedule of work, making miscellaneous
technical clarifications and providing a list
of procedures and tests requiring inspection
by appropriate city and county agencies.
(2) Consideration of motion approving Addendum
No. 2 to the plans and specifications for
Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground
Tank Replacement at Plant No. 2, Specification
No. R-025-2, providing for the inclusion of
provisions relative to time allowed for
completion of contract and establishing
liquidated damages amount.
(3) Consideration of Resolution No. 87-73 ,
receiving and filing bid tabulation and
recommendation, and awarding contract for
Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground
Tank Replacement at Plant No. 2,
Specification No. R-025-2, to Sancon
Engineering, Inc. for the total amount of
$305,185.00. See page K.
(i) Consideration of motion to receiving and filing
bid tabulation and recommendation and awarding
contract for Blueprinting, Photocopying and
Related Services, Specification No. 5-041, to
Consolidated Reprographics for an amount not to
exceed $75,000 for a one-year period beginning
July 16, 1987, with provisions for a one-year
extension. See page "L"
-5-
7/08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued) '
( j) (1) Consideration of motion to receive, file and
approve the Selection Committee certification
of the final negotiated fee re Addendum No. 3
to the Architectural Services Agreement with
Pulaski and Arita, Architects, Incorporated,
for the design of Administration Building
Addition, Job No. J-7-4, providing additional
design services to modify the heating,
ventilation and cooling system. See page
"M"
(2) Consideration of Resolution No. 87-74 ,
approving Addendum No. 3 to the Architectural
Services Agreement with Pulaski and Arita,
Architects, Incorporated, for design of
Administration Building Addition, Job
No. J-7-4, providing additional design
services to modify the heating, ventilation
and cooling system, on an hourly-rate basis
for labor including overhead, plus fixed
profit, for an additional amount not to exceed
$10,867.00, increasing the total authorized
compensation from $237 ,000 .00 to an amount not
to exceed $247,867.00. See page "N"
(k) (1) Consideration of motion to receive, file and
approve the Selection Committee certification
of the final negotiated fee re Professional
Services Agreement with Pulaski and Arita,
Architects, Incorporated, for design of
Phase I Improvements of Master Plan of
Support Facilities, Site and Security
Improvements at Treatment Plant No. 2, Job
No. P2-35-1. See page "0"
(2) Consideration of Resolution No. 87-75,
approving Professional Services Agreement
with Pulaski and Arita, Architects,
Incorporated for design of Phase I
Improvements of Master Plan of Support
Facilities, Site and Security Improvements at
Treatment Plant No. 2, Job No. P2-35-1, on an
hourly-rate basis for labor plus overhead,
plus direct expenses and fixed profit, for a
total amount not to exceed $93,375.00.
See page P.
(1) (1) Consideration of motion to receive and file
Selection Committee certification of the
final negotiated fee re Engineering Services
Agreement with Brown and Caldwell Consulting
Engineers for design and related services re
Miscellaneous Modifications and Improvements
to Facilities at Treatment Plant No. 2, Job
No. P2-37. See page "Q"
[ITEM 11(1) CONTINUED ON PAGE 71
-6-
7/08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued)
(1) (2) Consideration of Resolution No. 87-76,
approving Engineering Services Agreement with
Brown and Caldwell Consulting Engineers for
design and related services re Miscellaneous
Modifications and Improvements to Facilities
at Treatment Plant No. 2, Job No. P2-37, on an
hourly-rate basis for labor plus overhead,
plus direct expenses and fixed profit, for a
total amount not to exceed $364,000.00. See
page "R"
(m) Consideration of motion authorizing the staff to
issue Change Order No. 1 to Purchase Order
No. 26444 to Carleton Engineers a Consultants, Inc.
for additional consulting assistance in acquiring
air emission credits required by SCAQMD, and
securing approval of said emission credits by
SCAQMD for the Central Power Generation Systems
project (Job No. J-19) .
(n) consideration of motion authorizing the Selection
Committee to negotiate Addendum No. 1 to the
Engineering Services Agreement with Boyle
Engineering Corporation for the design of
Entrances, Site, Security and Interior Roads,
Plant No. 1, Job No. P1-27, for additional
services required to coordinate construction with
several concurrent projects, and to obtain a
CALTRANS permit for the new entrance on Ellis
Avenue at the San Diego Freeway southbound
on/offramp.
(o) Consideration of Resolution No. 87-77, approving
and authorizing execution of a Grant of Easement
to Southern California Edison Company for
installation and maintenance of SCEC facilities on
Districts' property in order to provide separate
electrical service to the Administration and
Laboratory buildings. See page S.
DISTRICT 1
(p) (1) Consideration of motion approving Addendum
No. 1 to the plans and specifications for
Santa Ana/Dyer Road Trunk Sewer Manhole
Rehabilitation, Contract No. 1-15R,
increasing the number of manholes to be
rehabilitated from 23 to 25, transmitting
revised Schedule of Prices and making
miscellaneous technical clarifications and
modifications.
(2) Consideration of Resolution No. 87-90-1,
receiving and filing bid tabulation and
recommendation, and awarding contract for
Santa Ana/Dyer Road Trunk Sewer Manhole
Rehabilitation, Contract No. 1-15R, to
Sancon Engineering, Inc. for the total amount
of $139,000.00 . See page "T"
-7-
7/08/87
(11) DISTRICT 2 (CONSENT CALENDAR Continued)
(q) Consideration of motion approving Amendment No. 1
to the Consolidated Master Plan of Trunk Sewers
for County Sanitation Districts Nos . 2, 3 and 11 �✓
relative to the District No. 2 Euclid/Newhope-
Placentia Drainage Area.
(r) Consideration of Resolution No. 87-91-2, approving
agreement with the City of Garden Grove relative
to a cooperative project in connection with the
construction of a Portion of Euclid Interceptor
Sewer, Contract No. 2-26-1, between Lampson
Avenue and Orangewood Avenue, and a City storm
drain between Lampson Avenue and Chapman Avenue.
See page "V
(s) (1) Consideration of motion authorizing the staff
and General Counsel to negotiate an agreement
with the City of Brea relative to a
cooperative project in connection with
construction of District's North Branch of the
Rolling Hills Drive Relief Subtrunk Sewer,
Contract No. 2-11-3, and City sewer
improvements.
(2) Consideration of motion authorizing the
Selection Committee to solicit proposals and
negotiate an agreement with Sam W. Peterson &
Associates for design of the North Branch of
the Rolling Hills Drive Relief Subtrunk Sewer,
Contract No. 2-11-3 .
DISTRICT 3
(t) Consideration of motion amending Board action of
May 20, 1987, approving Emergency Repairs to
Miller-Holder Trunk Sewer, La Habra Purchase
Section, Lines "E" & "W" (Contract No. 3-32R) ,
to authorize staff to solicit informal bids and
issue purchase orders to contractors to effect the
Abandonment of Miller-Holder Trunk Sewer, La Habra
Purchase Section, Line "W" (Contract No. 3-32R-1)
south of Imperial Highway at a Location where the
tributary drainage area can be diverted to Line "E" ,
provided that the total cost for the initial
emergency repairs and the abandonment shall not
exceed the original authorization granted by the
Board of $100,000.
DISTRICTS 5 & 6
(u) Consideration of motion ratifying action of staff
in proceeding with Emergency Repairs to Coast
Highway Force Main and Bitter Point Pump Station,
Contract No. 5-30R, in a total amount not to exceed
$70,000.00.
-8-
7/08/87
(11) DISTRICT 7 (CONSENT CALENDAR Continued)
(v) Consideration of Resolution No. 87-92-7, accepting
�...i Grant Deed from A & R, a California Limited
Partnership, conveying ownership of the Hear Street
Relief Trunk Sewer, Contract No. 7-6-1A, to the
District, at no cost to the District. See
page "V"
END OF CONSENT CALENDAR
2) ALL DISTRICTS
Consideration of action on items deleted from Consent
Calendar, if any
�.. -9-
7/08/87
(13 ) ALL DISTRICTS
(a) Report of the Executive Committee and consideration of
motion to receive, file and approve the Committee's
written report of the meeting on June 24 , 1987. �../
(Copy enclosed with agenda material)
(b) Consideration of action on items recommended by the
Executive Committee:
(1) Consideration of motion approving Issue Paper and
Recommended Actions Re Impact on Publicly-Owned
Sewage Treatment Works (POTW' s) of Proposed South
Coast Air Quality Management District Rule 223
and Rule 224.
(2) Consideration of Resolution No. 87-78, amending
Classification & Compensation Resolution
No. 79-20, as amended, providing for certain
organizational changes .
(14) EACH DISTRICT
(a) Staff report re proposed fiscal year 1987-88 budgets
(b) DISTRICT 1
Roll call vote approving 1987-88 fiscal year budget
(c) DISTRICT 2
Roll call vote approving 1987-88 fiscal year budget
(d) DISTRICT 3
Roll call vote approving 1987-88 fiscal year budget
(e) DISTRICT 5
Roll call vote approving 1987-88 fiscal year budget
(f) DISTRICT 6
Roll call vote approving 1987-88 fiscal year budget
(g) DISTRICT 7
Roll call vote approving 1987-88 fiscal year budget
(h) DISTRICT 11
Roll call vote approving 1987-88 fiscal year budget
( i) DISTRICT13
Roll call vote approving 1987-88 fiscal year budget
( j) DISTRICT 14
Roll call vote approving 1987-88 fiscal year budget
�..
-10-
7/08/87
(15) DISTRICTS 1,2,3,5,6,7 5 11 (ONLY)
Consideration of the following resolutions establishing the
annual Gann appropriations limit for fiscal year 1987-88
for each District in accordance with the provisions of
Division 9 of Title 1 of the California Government Code.
See page "W.,
DISTRICT RESO. NO. LIMITATION
1 87-79-1 $ 1,915 .00
2 87-80-2 7,965 ,000
3 87-81-3 10,031,000
5 87-82-5 2,063,000
6 87-83-6 1,201,000
7 87-84-7 2,396 ,000
11 87-85-11 2,108,000
13 --- Not Applicable
14 --- Not Applicable
(16) DISTRICTS 1,5,6 E 13 (ONLY)
Consideration of the following Resolutions directing the
County Auditor-Controller to include sewer service charges
on the 1987-88 property tax bills: See page X.
87-86-1
87-87-5
87-88-6
87-89-13
(17) ALL DISTRICTS
(a) Report of the Building Committee and consideration of
motion to receive, file and approve the Committee's
written report of the meeting on June 18, 1987.
(Copy enclosed with Directors' agenda material)
(b) Consideration of action on items recommended by the
Building Committee:
(1) Consideration of motion approving Amendment No. 1
to January 20, 1986 Master Plan of Support
Facilities for Plant No. 1, to include Warehouse
and Maintenance Building and Oil Storage and
Dispensing Improvements (Job No. J-20)
(2) Consideration of motion authorizing the Selection
Committee to solicit proposals and negotiate an
agreement for design of Warehouse and Maintenance
Building and Oil Storage and Dispensing
Improvements, Job No. J-20
(18) ALL DISTRICTS
(a) Report of the Fiscal Policy Committee and consideration
of motion to receive, file and approve the Committee' s
written report dated June 29, 1987 re 1987-88 Workers'
Compensation Insurance Policy Renewal (Copy enclosed
with Directors' agenda material)
(b) Consideration of motion ratifying action of Fiscal
�..� Policy Committee in placing statutory Excess Workers'
Compensation insurance coverage, with $200,000
self-insured retention, effective July 1, 1987 for an
annual premium not to exceed $29,500.
-11-
7/08/87
(19) ALL DISTRICTS
Closed Session: During the course of conducting the
busineess set forth on this agenda as a regular
meeting of the Boards, the Chairman may convene the
Boards in closed session to consider matters of
pending or potential litigation, or personnel
matters, pursuant to Government Code Sections 54956 .9
or 54957.6 .
Reports relating to (a) purchase and sale of real
property= (b) matters of pending or potential
litigation; (c) employee compensation; or which are
exempt from public disclosure under the California
Public Records Act, may be reviewed by the Boards
during a permitted closed session and are not
available for public inspection. At such time as
final actions are taken by the Directors on any of
these subjects, the minutes will reflect all required
disclosures of information.
(a) Convene in closed session, if necessary
(b) Reconvene in regular session
(c) Consideration of action, if any, on matters considered
in closed session.
(20) ALL DISTRICTS
Other business and communications or supplemental agenda
items, if any
(21) DISTRICT 1
Other business and communications or supplemental agenda
items, if any
(22) DISTRICT 1
Consideration of motion to adjourn
(23) DISTRICT 2
Other business and communications or supplemental agenda
items, if any
(24) DISTRICT 2
Consideration of motion to adjourn
(25) DISTRICT 3
Other business and communications or supplemental agenda
items, if any
(26) DISTRICT 3
Consideration of motion to adjourn to 7:00 p.m. , Wednesday,
July 15, 1987 , in the Districts' Administrative offices, to
consider the District's long-range financial plan
( 27) DISTRICT 5
Other business and communications or supplemental agenda
items, if any
-12-
7/08/87
' (28) DISTRICT 5
Consideration of motion to adjourn
(29) DISTRICT 6
Other business and communications or supplemental agenda
items, if any
(30) DISTRICT 6
Consideration of motion to adjourn
(31) DISTRICT 11
Other business and communications or supplemental agenda
items, if any
(32) DISTRICT 11
Consideration of motion to adjourn
(33) DISTRICT 13
Other business and communications or supplemental agenda
items, if any
(34) DISTRICT 13
Consideration of motion to adjourn
(35) DISTRICT 14
Other business and communications or supplemental agenda
items, if any
(36) DISTRICT 14
Consideration of motion to adjourn
(37) DISTRICT 7
Consideration of actions relative to the North Airport
Diversion Sewer, Contract No. 7-10 , and the South Airport
Diversion Sewer, Contract No. 7-10-1:
(a) Consideration of items relative to CEQA requirements:
(1) Consideration of motion to receive and file Staff
Summary of projects and written comments received
on Negative Declaration for North Airport
Diversion Sewer, Contract No. 7-10, and South
Airport Diversion Sewer, Contract No. 7-10-1.
See page Y.
(2) Consideration of motion to receive and file
written comments received on Negative Declaration
for North Airport Diversion Sewer, Contract
No. 7-10, and South Airport Diversion Sewer,
Contract No. 7-10-1 (Attached to Staff Summary)
(3) Consideration of Resolution No. 87-93-7,
approving Negative Declaration for Abandonment of
South Irvine Subtrunk (Extension of Michelson
Drive Subtrunk Sewer) and MacArthur Trunk Sewer;
and Redirection of Flows to North Airport
Diversion Sewer (Contract No. 7-10) , and the
South Airport Diversion Sewer (Contract
No. 7-10-1) ; and authorizing filing of Notice of
Determination pursuant to CEQA. See page "Z"
(ITEM 37 CONTINUED ON PAGE 141
-13-
7/08/87
(37) DISTRICT 7 (Continued)
(b) Consideration of Resolution No. 87-94-7, approving
project for construction of North Airport Diversion
Sewer, Contract No. 7-10; and authorizing the General
Manager, with the concurrence of the Chairman of the
District, to award said contract to the lowest
responsible bidder. See page "AA"
(c) Verbal report of General Counsel re status of
acquiring necessary easements for construction of
North Airport Diversion Sewer, Contract No. 7-10, as
authorized by the Board on April 8, 1987
(1) Consideration of Resolution No. 87-95-7,
approving Consent Agreement with Business Center
Drive IV, a general partnership consisting of
Jamboree Properties and Reinhold Fowler, lessees
of property owned by The Irvine Company, over
which the District requires an easement for
construction and perpetual right-of-way needed
relative to the North Airport Diversion Sewer,
Contract No. 7-10; and authorizing payment of a
total amount not to exceed $ for said
right-of-way consent.
(2) Consideration of Resolution No, 87-96-7,
approving and accepting temporary and permanent
Grants of Easement from The Irvine Company
required in connection with construction and
perpetual right-of-way needed relative to the
North Airport Diversion Sewer, Contract No. 7-10;
and authorizing payment of a total amount not to
exceed $ for said right-of-way.
(3) Consideration of Resolution No. 87-97-7,
approving and accepting temporary and permanent
Grants of Easement from Parker-Hannifin
Corporation required in connection with
construction and perpetual right-of-way needed
relative to the North Airport Diversion Sewer,
Contract No. 7-10; and authorizing payment of a
total amount not to exceed $ for said
right-of-way.
(38) DISTRICT 7
Other business and communications or supplemental agenda
items, if any
(39) DISTRICT 7
Consideration of motion to adjourn
-14-
v T BOARDS OF DIRECTORS
County SanitsBon Districts vwr orfiw Bar elv
of Orange County, California 10844 Ellis Avenue
Fountain Volley, Calif., 92708
Am Ta Ca&
JOINT BOARDS 14
9S�11
AGENDA
REGULAR MEETING
JULY 8, 1987 - 7:30 P.M.
In accordance with the requirements of California Government
Code Section 54954.2. this agenda is posted not less than 72
hours prior to the meeting date and time above. All written
materials relating to each agenda item are available for public
inspection in the office of the Board Secretary.
In the event any matter not listed on this agenda is
proposed to be submitted to the Boards for discussion and/or
action, it will be done in compliance with Section 54954.2, or
as set forth on a supplemental agenda posted not less than 72
hours prior to the meeting date.
°
(1) Pledge of Allegiance and Invocation
(2) Roll call
(3) Appointment of Chairmen pro tem, if necessary
(4) Consideration of motion to receive and file minute excerpts
of member agencies relatingto appointment of Directors, if
any. (See listing in Board Meeting folders)
(5) Public Comments: All persons wishing to address the Boards
on specific agenda items or matters of general interest
should do so at this time. As determined by the Chairman,
speakers may be deferred until the specific item is taken
for discussion and remarks may be limited to five minutes.
(6) The Joint Chairman, General Manager and General Counsel
present verbal reports on miscellaneous matters of general
interest to the Directors. These reports are for
information only and require no action by the Directors.
(a) Report of Joint Chairman
(b) Report of*General Manager - V'J� ^^^"-
(c) Report of General Counsel
(7) Annual election of Joint .Chairman
(Nominee: Director Don E. Smith)
u Judi
(8) Annual election of vice Joint Chairman
cc
e< �.....• 0c—
7/08/87 i
i
(9) EACH DISTRICT _
ACTION: If no corrections or amendments are made, the
following minutes will be deemed approved as
mailed and be so ordered by the Chairman:
District 1 - June 10, 1987 regular
District 2 - June 10, 1987 regular
District 3 - June 10, 1987 regular
District 5 - June 10, 1987 regular
District 6 - June 10, 1987 regular
District 7 - June 10, 1987 regular
District 11 - June 10, 1987 regular
District 13 - June 10, 1987 regular
District 14 - June 10, 1987 regular
(10) ALL DISTRICTS
Consideration of roll call vote motion ratifying payment of
claims of the joint and individual Districts as follows:
(Each Director shall be called only once and that vote will
be regarded as the same for each District represented unless
a Director expresses a desire to vote differently for any
District. ) , See pages "A" and "B"
6 10 87 6 24 87
ALL DISTRICTS
Joint Operating Fund - $ 179,211.17 $ 761,865.85
Capital Outlay Revolving Fund - 1,254,923.04 510,293.98
Joint working Capital Fund - 44,949.87 109,074.40
Self-Funded Insurance Funds - 7,076 .32 2,064.20
DISTRICT NO. 1 - 18.44 1,225.80
DISTRICT NO. 2 - 2,613,356 .20 41,339.22
DISTRICT NO. 3 - 3,248 .31 12,075.80
DISTRICT NO. 5 - 509,358.52 11,699.90
DISTRICT NO. 6 - 13 ,367.45 284 .56
DISTRICT NO. 7 - 1,996 .52 2,465 .08
DISTRICT NO. 11 - 202.45 5,702.19
DISTRICT NO. 13 - 18.44 64,890.00
DISTRICT NO. 14 - 20 .00 480.00
DISTRICTS NOS. 5 & 6 JOINT - 482,489.20 3,139.80
DISTRICTS NOS. 6 & 7 JOINT - 5,467.36 32 .51
DISTRICTS NOS. 7 & 14 JOINT - 1,368.39 4,557 .91
$5,117,071.68 $1,531,191.20
-2-
7/08/87
(11) CONSENT CALENDAR - ITEMS 11(a) THROUGH 11(v)
All matters placed on the consent calendar are
considered as not requiring discussion or further
explanation and unless any particular item is
requested to be removed from the consent calendar by
a Director, staff member, or member of the public in
attendance, there will be no separate discussion of
these items. All items on the consent calendar will
be enacted by one action approving all motions, and
casting a unanimous ballot for resolutions included
on the consent calendar. All items removed from the
consent calendar shall be considered in the regular
order of business.
Members of the public who wish to remove an item
from the consent calendar shall, upon recognition by
the chair, state their name, address and designate
by letter the item to be removed from the consent
calendar.
The Chairman will determine if any items are to be
deleted from the consent calendar.
Consideration of action to approve all agenda items
appearing on the consent calendar not specifically
removed from same, as follows: -
ALL DISTRICTS
(a) Consideration of the following resolutions
authorizing and directing execution and filing of
documents necessary for Federal and State Clean
Water Grants and Loans under 33 U.S.C. ,
12551 at seq. ; Chapters 12.5, 13, 14 and 15; and
Division 7 of the California Water Code, and
providing certain assurances in connection with
the 1987-88 Joint Works Improvements and Additions:
See page C.
District No. Resolution No.
1 87-61-1
2 87-62-2
3 87-63-3
5 87-64-5
6 87-65-6
7 87-66-7
11 87-67-11
13 87-68-13
14 87-69-14
-3-
V08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued)
(b) (1) Consideration of motion approving Change
Order No. 9 to the plans and specifications
for Rehabilitation of Domes and Sludge Pump
Mixing Systems for Digesters 5 and 6 at k.✓
Reclamation Plant No. 1, Job No. PW-061R-1,
authorizing an addition of $13 ,967 .39 to the
contract with Margate Construction, Inc. for
sealing abandoned pipe penetrations,
miscellaneous concrete work, piping
modifications, additional piping hangers and
supports, and modification of base supports
for digester suction line at both Digesters 5
and 6 to facilitate operation and maintenance.
See page "D"
(2) Consideration of Resolution No. 87-70,
accepting Rehabilitation of Domes and Sludge
Pump Mixing Systems for Digesters 5 and 6 at
Reclamation Plant No. 1, Job No. PW-061R-1,
as complete, authorizing execution of a
Notice of Completion and approving Final
Closeout Agreement. See page "E"
(c) Consideration of motion approving Change Order
No. 3 to the plans and specifications for Advanced
Primary Treatment Chemical Addition Facilities at
Plant No. 1, Job No. P1-28 , and Advanced Primary
Treatment Chemical Addition Facilities at Plant
No. 2, Job No. P2-36, authorizing an addition of
$14,196.00 to the contract with Ziebarth & Alper
for extension of polymer drain and construction of
protective barricade; installation of floor drain;
door modifications; and additional piping in
ferric chloride pump room, and granting a time
extension of 17 calendar days for completion of
said additional work. See page "F"
(d) Consideration of motion approving Change Order
No. 11 to the plans and specifications for
Installation of Replacement Belt Filter Presses at
Plant No. 2, Job No. P2-28-1, authorizing an
addition of $10 ,956 .00 to the contract with
Ziebarth & Alper for installation of a bubbler
level system for controlling the centrifuge
centrate pumps, and modification of belt press
drains to provide necessary clearance, and granting
a time extension of 18 calendar days for completion
of said additional work. See page "G"
(e) Consideration of motion approving Change Order
No. 1 to the plans and specifications for Removal
of Grit at Plant No. 2, Specification No. M-029,
reducing the aggregate general liability insurance
requirement for bodily injury and property damage
from $3,000,000 to $1,000,000, for a total k�/
deduction of $5,000.00 from the contract with
Falcon Disposal Service, Inc. See page "H"
-4-
7/08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued)
(f) Consideration of Resolution No. 87-71, approving
plans and specifications for Lighting Conservation
Facilities at Plants 1 and 2, Job No. J-16, and
v..� authorizing the General Manager to establish the
date for receipt of bids (Tentative bid date is
August 25, 1987) . See page "I"
(g) Consideration of Resolution No. 87-72, accepting
Rehabilitation of No. 4 Trickling Filter at
Reclamation Plant No. 1, Specification No. R-024,
as complete, authorizing execution of a Notice of
Completion and approving Final Closeout Agreement. -
See page J.
(h) (1) Consideration of motion approving Addendum
No. 1 to the plans and specifications for
Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground
Tank Replacement at Plant No. 2,
Specification No. R-025-2, revising the
schedule of work, making miscellaneous
technical clarifications and providing a list
of procedures and tests requiring inspection
by appropriate city and county agencies.
(2) Consideration of motion approving Addendum
No. 2 to the plans and specifications for
Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground
Tank Replacement at Plant No. 2, Specification
No. R-025-2, providing for the inclusion of
provisions relative to time allowed for
completion of contract and establishing
liquidated damages amount.
(3) Consideration of Resolution No. 87-73,
receiving and filing bid tabulation and
- recommendation, and awarding contract for
Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground
Tank Replacement at Plant No. 2,
Specification No. R-025-2, to Sancon
Engineering, Inc, for the total amount of
$305,185.00. See page "R"
( i) Consideration of motion to receiving and filing
bid tabulation and recommendation and awarding
contract for Blueprinting, Photocopying and
Related Services, Specification No. 5-041, to
Consolidated Reprographics for an amount not to
exceed $75,000 for a one-year period beginning
July 16, 1987, with provisions for a one-year
extension. See page "L"
-5-
7/08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued)
( j) (1) Consideration of motion to receive, file and
approve the Selection Committee certification
of the final negotiated fee re Addendum No. 3
to the Architectural Services Agreement with
Pulaski and Arita, Architects, Incorporated,
for the design of Administration Building
Addition, Job No. J-7-4, providing additional
design services to modify the heating,
ventilation and cooling system. See page
"M"
(2) Consideration of Resolution No. 87-74,
approving Addendum No. 3 to the Architectural
Services Agreement with Pulaski and Arita,
Architects, Incorporated, for design of
Administration Building Addition, Job
No. J-7-4, providing additional design
services to modify the heating, ventilation
and cooling system, on an hourly-rate basis
for labor including overhead, plus fixed
profit, for an additional amount not to exceed
$10,867.00, increasing the total authorized
compensation from $237,000.00 to an amount not
to exceed $247,867.00. See page "N"
(k) (1) Consideration of motion to receive, file and
approve the Selection Committee certification
of the final negotiated fee re Professional
Services Agreement with Pulaski and Arita,
Architects, Incorporated, for design of
Phase I Improvements of Master Plan of
Support Facilities, Site and Security
Improvements at Treatment Plant No, 2, Job
No. P2-35-1. See page "O"
(2) Consideration of Resolution No. 87-75,
approving Professional Services Agreement
with Pulaski and Arita, Architects,
Incorporated for design of Phase I
Improvements of Master Plan of Support
Facilities, Site and Security Improvements at
Treatment Plant No. 2 , Job No. P2-35-1, on an
hourly-rate basis for labor plus overhead,
plus direct expenses and fixed profit, for a
total amount not to exceed $93,375.00 .
See page "P"
(1) (1) Consideration of motion to receive and file
Selection Committee certification of the
final negotiated fee re Engineering Services
Agreement with Brown and Caldwell Consulting
Engineers for design and related services re
Miscellaneous Modifications and Improvements
to Facilities at Treatment Plant No. 2, Job
No. P2-37. See page
(ITEM 11(l) CONTINUED ON PAGE 71
-6-
7/08/87
(11) ALL DISTRICTS (CONSENT CALENDAR Continued)
(1) (2) Consideration of Resolution No. 87-76,
approving Engineering Services Agreement with
Brown and Caldwell Consulting Engineers for
design and related services re Miscellaneous
Modifications and Improvements to Facilities
at Treatment Plant No. 2, Job No. P2-37, on an
hourly-rate basis for labor plus overhead,
plus direct expenses and fixed profit, for a
total amount not to exceed $364,000.00. See
page "R"
(m) Consideration of motion authorizing the staff to
issue Change Order No. 1 to Purchase Order
No. 26444 to Carleton Engineers & Consultants, Inc.
for additional consulting assistance in acquiring
air emission credits required by SCAQMD, and
securing approval of said emission credits by
SCAQMD for the Central Power Generation Systems
project (Job No. J-19) . �u,;,.�,... - I -' ', _. IS-,,
(n) Consideration of motion authorizing the Selection
Committee to negotiate Addendum No. 1 to the
Engineering Services Agreement with Boyle
Engineering Corporation for the design of
Entrances, Site, Security and Interior Roads,
Plant No. 1, Job No. P1-27, for additional -
services required to coordinate construction with
several concurrent projects, and to obtain a
CALTRANS permit for the new entrance on Ellis
Avenue at the San Diego Freeway southbound
on/offramp.
(o) Consideration of Resolution No. 87-77, approving
and authorizing execution of a Grant of Easement
to Southern California Edison Company for
installation and maintenance of SCEC facilities on
Districts' property in order. to provide separate
electrical service to the Administration and
Laboratory buildings. See page S.
DISTRICT 1
(p) (1) Consideration of motion approving Addendum
No. 1 to the plans and specifications for
Santa Ana/Dyer Road Trunk Sewer Manhole
Rehabilitation, Contract No. 1-15R,
increasing the number of manholes to be
rehabilitated from 23 to 25, transmitting
revised Schedule of Prices and making
miscellaneous technical clarifications and
modifications.
(2) Consideration of Resolution No. 87-90-1,
receiving and filing bid tabulation and
recommendation, and awarding contract for
Santa Ana/Dyer Road Trunk Sewer Manhole
Rehabilitation, Contract No. 1-15R, to
Sancon Engineering, Inc. for the total amount
of $139,000 .00 . See page "T"
-7-
7/08/87
(11) DISTRICT 2 (CONSENT CALENDAR Continued)
(q) Consideration of motion approving Amendment No. 1
to the Consolidated Master Plan of Trunk Sewers
for County Sanitation Districts Nos . 2, 3 and 11
relative to the District No. 2 Euclid/Newhope-
Placentia Drainage Area.
(r) Consideration of Resolution No. 87-91-2, approving
agreement with the City of Garden Grove relative
to a Cooperative project in connection with the
construction of a Portion of Euclid Interceptor
Sewer, Contract No. 2-26-1, between Lampson
Avenue and Orangewood Avenue, and a City storm
drain between Lampson Avenue and Chapman Avenue.
See page U.
(a) (1) Consideration of motion authorizing the staff
and General Counsel to negotiate an agreement
with the City of Brea relative to a
cooperative project in connection with
construction of District's North Branch of the
Rolling Hills Drive Relief Subtrunk Sewer,
Contract No. 2-11-3, and City sewer
improvements.
(2) Consideration of motion authorizing the
Selection Committee to solicit proposals and
negotiate an agreement with Sam W. Peterson &
Associates for design of the North Branch of
the Rolling Hills Drive Relief Subtrunk Sewer,
Contract No. 2-11-3.
DISTRICT 3
(t) Consideration of motion amending Board action of
May 20, 1987, approving Emergency Repairs to
Miller-Holder Trunk Sewer, La Habra Purchase
Section, Lines "E" E "W" (Contract No. 3-32R) ,
to authorize staff to solicit informal bids and
issue purchase orders to contractors to effect the
Abandonment of Miller-Holder Trunk Sewer, La Habra
Purchase Section, Line "W" (Contract No. 3-32R-1)
south of Imperial Highway at a location where the
tributary drainage area can be diverted to Line "E" ,
provided that the total cost for the initial
emergency repairs and the abandonment shall not
exceed the original authorization granted by the
Board of $100 ,000. '
DISTRICTS 5 6 6
(u) Consideration of motion ratifying action of staff
in proceeding with Emergency Repairs to Coast
Highway Force Main and Bitter Point Pump Station,
Contract No. 5-30R, in a total amount not to exceed
$70,000.00 .
-8-
7/08/87
(11) DISTRICT 7 (CONSENT CALENDAR Continued)
(v) Consideration of Resolution No. 87-92-7, accepting
Grant Deed from A & R, a California Limited
Partnership, conveying ownership of the Bear Street
Relief Trunk Sewer, Contract No. 7-6-1A, to the
District, at no cost to the District. See
page V.
END OF CONSENT CALENDAR
2) ALL DISTRICTS
Consideration of action on items deleted from Consent
Calendar, if any
..✓ -9-
7/08/87
(13) ALL DISTRICTS
(a) Report of the Executive Committee and consideration of
motion to receive, file and approve the Committee' s
written report of the meeting on June 24 , 1987. �a✓
(Copy enclosed with agenda material)
(b) Consideration of action on items recommended by the
Executive Committee:
(1) Consideration of motion approving Issue Paper and
Recommended Actions Re Impact on Publicly-Owned
Sewage Treatment Works (POTW's) of Proposed South
Coast Air Qu ity Management District Rule 223
and Rule A W.
(�o/
w. (2) Consideration of Resolution No. 87-78, amending
Classification & Compensation Resolution
No. 79-20, as amended, providing for certain
�0yu organizational changes.
(14) EACH DISTRICT
(a) Staff report re proposed fiscal year 1987-88 budgets
(b) DISTRICT 1
Roll call vote approving 1987-88 fiscal year budget
(c) DISTRICT 2
Roll call vote approving 1987-88 fiscal year budget
(d) DISTRICT 3
Roll call vote approving 1987-88 fiscal year budget
(a) DISTRICT 5
Roll call vote approving 1987-88 fiscal year budget
(f) DISTRICT 6
Roll call vote approving 1987-88 fiscal year budget
(g) DISTRICT 7
Roll call vote approving 1987-88 fiscal year budget
(h) DISTRICT 11
Roll call vote approving 1987-88 fiscal year budget
( i) DISTRICT 13
Roll call vote approving 1987-88 fiscal year budget
( j) DISTRICT 14
Roll call vote approving 1987-88 fiscal year budget
-10-
7/08/87
(15) DISTRICTS 1,2,3,5,the f o11 o(ONL Consideration o ngY
esolutions establishing the
annual Gann appropriations limit for fiscal year 1987-88
for each District in accordance with the provisions of
Division 9 of Title 1 of the California Government Code.
See page W.
DISTRICT RESO. NO. LIMITATION
1 87-79-1 $ 1,915.00
2 87-80-2 7,965,000
3 87-81-3 10,031,000
5 87-82-5 2,063 ,000
6 87-83-6 1,201,000
7 87-84-7 2,396 ,000
11 87-85-11 2,108,000
13 --- Not Applicable
14 --- Not Applicable
(16) DISTRICTS �5,6 4 13 (ONLY)
Consideration of the following Resolutions directing the
County Auditor-Controller to include sewer service charges
on the 1987-88 property tax bills: See page X.
87-86-1
87-87-5
87-88-6
87-89-13
(17) ALL DISTRICTS
(a) Report of the Building Committee and consideration of
motion to receive, file and approve the Committee's
written report of the meeting on June 18, 1987.
(Copy enclosed with Directors' agenda material)
(b) Consideration of action on items recommended by the
Building Committee:
(1) Consideration of motion approving Amendment No. 1
to January 20, 1986 Master Plan of Support
Facilities for Plant No. 1, to include Warehouse
and Maintenance Building and Oil Storage and
Dispensing Improvements (Job No. J-20 )
(2) Consideration of motion authorizing the Selection
Committee to solicit proposals and negotiate an
agreement for design of Warehouse and Maintenance
Building and Oil Storage and Dispensing
Improvements, Job No. J-20
(18) ALL DISTRICTS
(a) Report of the Fiscal Policy Committee and consideration
of motion to receive, file and approve the Committee's
written report dated June 29, 1987 re 1987-88 Workers'
Compensation Insurance Policy Renewal (Copy enclosed
with Directors' agenda material)
(b) Consideration of motion ratifying action of Fiscal
Policy Committee in placing statutory Excess Workers'
Compensation insurance coverage, with $200,000
self-insured retention, effective July 1, 1987 for an
annual premium not to exceed $29,500.
-11-
7/08/87
(19) ALL DISTRICTS
Closed Session: During the coursq of conducting the
business set forth on this agenda as a regular
meeting of the Boards, the Chairman may convene the
Boards in closed session to consider matters of
pending or potential litigation, or personnel
matters, pursuant to Government Code Sections 54956.9
or 54957.6.
Reports relating to (a) purchase and sale of real
property; (b) matters of pending or potential
litigation; (c) employee compensation; or which are
exempt from public disclosure under the California
Public Records Act, may be reviewed by the Boards
during a permitted closed session and are not
available for public inspection. At such time as
final actions are taken by the Directors on any of
these subjects, the minutes will reflect all required
disclosures of information.
(a) Convene in closed session, if necessary
(b) Reconvene in regular session
(c) Consideration of action, if any, on matters considered
in closed session.
(20) ALL DISTRICTS -
other business and communications or supplemental agenda
items, if any
(21) DISTRICT 1
Other business and communications or supplemental agenda
items, if any
(22) DISTRICT 1
Consideration of motion to adjourn
(23) DISTRICT 2
Other business and communications or supplemental agenda
items, if any
(24) DISTRICT 2
Consideration of motion to adjourn
(25) DISTRICT 3
Other business and communications or supplemental agenda
items, if any
(26) DISTRICT 3
Consideration of motion to adjourn to 7200 p.m. , Wednesday,
July 15, 1987 , in the Districts' Administrative offices, to
consider the District' s long-range financial plan
(27) DISTRICT 5
Other business and communications or supplemental agenda
items, if any
-12-
7/08/87
(28) DISTRICT 5
Consideration of motion to adjourn
(29) DISTRICT 6
Other business and communications or supplemental agenda
�..' items, if any
(30) DISTRICT 6
Consideration of motion to adjourn
(31) DISTRICT 11
Other business and communications or supplemental agenda
items , if any
(32) DISTRICT 11
Consideration of motion to adjourn
(33) DISTRICT 13
other business and communications or supplemental agenda
items, if any
(34) DISTRICT 13
Consideration of motion to adjourn
(35) DISTRICT 14
Other business and communications or supplemental agenda
items, if any
(36) DISTRICT 14
Consideration of motion to adjourn
(37) DISTRICT 7
Consideration of actions relative to the North Airport
Diversion Sewer, Contract No. 7-10, and the South Airport
Diversion Sewer, Contract No. 7-10-1:
(a) Consideration of items relative to CEQA requirements:
(1) Consideration of motion to receive and file Staff
Summary of projects and written comments received
on Negative Declaration for North Airport
Diversion Sewer, Contract No. 7-10, and South
Airport Diversion Sewer, Contract No. 7-10-1.
See page Y.
(2) Consideration of motion to receive and file
written comments received on Negative Declaration
for North Airport Diversion Sewer, Contract
No. 7-10, and South Airport Diversion Sewer,
Contract No. 7-10-1 (Attached to Staff Summary)
(3) Consideration of Resolution No. 87-93-7,
approving Negative Declaration for Abandonment of
South Irvine Subtrunk (Extension of Michelson
Drive Subtrunk Sewer) and MacArthur Trunk Sewer;
and Redirection of Flows to North Airport
Diversion Sewer (Contract No. 7-10) , and the
South Airport Diversion Sewer (Contract
No. 7-10-1) ; and authorizing filing of Notice of
Determination pursuant to CEQA. See page "Z"
[ITEM 37 CONTINUED ON PAGE 141
-13-
7/08/87
i
(37) DISTRICT 7 (Continued)
(b) Consideration of Resolution No. 87-94-7, approving
project for construction of North Airport Diversion
Sewer, Contract No. 7-10; and authorizing the General
Manager, with the concurrence of the Chairman of the
District, to award said contract to the lowest
responsible bidder. See page "AA"
(IZ/ ✓ / (c) Verbal report of General Counsel re status of
acquiring necessary easements for construction of
North Airport Diversion Sewer, Contract No. 7-10 , as
authorized by the Board on April 8, 1987
(1) Consideration of Resolution No. 87-95-7,
approving Consent Agreement with Business Center
Drive IV, a general partnership consisting of
Jamboree Properties and Reinhold Fowler, lessees
of property owned by The Irvine Company, over
which the District requires an easement for
construction and perpetual right-of-way needed
relative to the North Airport Diversion Sewer,
Contract No. 7-10; and authori- ent of a
total amount not to exceed (S for said
right-of-way consent.
(2) Consideration of Resolution No. 87-96-7,
approving and accepting temporary and permanent
Grants of Easement from The Irvine Company
required in connection with construction and
perpetual right-of-way needed relative to the
North Airport Diversion Sewer, Contract No. 7-10;
and authari- izrg-payment of a total amount not to
exceed($\ lfor said right-of-way.
(3) Consideration of Resolution No. 87-97-7,
approving and accepting temporary and permanent
Grants of Easement from Parker-Hannifin
Corporation required in connection with
construction and perpetual right-of-way needed
relative to the North Airport Diversion Sewer,
Contract No. 7-10; and authorizing- nt of a
total amount not to exceed $ or said
right-of-way.
(38) DISTRICT 7
Other business and communications or supplemental agenda
items, if any
(39) DISTRICT 7
Consideration of motion to adjourn
-14-
MANAGER'S AGENDA REPORT
P.O.
County Sanitation Districts Fountain
ta8Valley, CA 9272 Avenue
of Orange County, California Telephone: (714) 962-2411
JOINT BOARD
Meeting Date
July 8, 1987 - 7:30 p.m.
The following is a brief explanation of the more important, non-routine
items which appear on the enclosed agenda and which are not otherwise
self-explanatory. Warrant lists are enclosed with the agenda material
summarizing the bills paid since the last Joint Board meeting.
To minimize the amount of redundancy and duplication in the agenda material
and reduce the number of amnents in the Manager's Report, we have expanded the
description of the agenda items in the agenda itself, particularly with regard
to change orders and contracts which have been publicly bid and are within the
contract budget or engineer's estimate. Detailed change orders are included in
the supporting material as well as the bid tabulations for the contracts being
recannended for award.
ALL DISTRICTS
No. 11(a) : Authorizing Applications for Federal Grants for 1987-88 Joint
Works Improvements and Additions.
The routine annual action appearing in the agenda adopts resolutions for
each of the Districts authorizing execution and filing of all documents
necessary for State and Federal Grant applications for 1987-88.
No. 11(b) : Approval of Change Order No. 4 to the Rehabilitation of Dames
and Sludge Pump Mixing Systems for Digesters 5 and 6 at Plant No. 1, Job
No. PW-061R-1 and Acceptance of Job as Complete.
(1) Change Order No. 4
Charge Order No. 4 adds $13,967.39 to the contract for rehabilitation of
domes and sludge pump mixing systems for two digesters at Plant No. 1. The
contract includes installation of high velocity pump mixing systems for
more efficient operation and maintenance, sealing both dames to eliminate the
escape of digester gas, and general rehabilitation work.
Change Order No. 4 incorporates five items of work which were required to
canplete the project, including sealing of pipe penetrations in the digester
walls, performing miscellaneous walkway concrete repairs, miscellaneous piping
modifications for the sludge grinders and pumps, additional hangers and supports
-1-
+ry
July 8, 1987
for the digester gas piping, and modification of the two sludge suction line 1../
support bases to facilitate digester operation and maintenance.
Staff recmmends the approval of Change Order No. 4 adding $13,967.39 to
the contract with Margate Construction, Inc. There is no time extension
associated with this change order.
(2) Acceptance of Job as Complete
Margate Construction, Inc. has fulfilled all contractual obligations within
the specified time as adjusted. Staff therefore reoommends adoption of the
resolution attached to the agenda material authorizing acceptance of the work as
complete, execution of the Final Closeout Agreement, and filing of the Notice of
Completion as required. The final project cost is $1,627,009.74.
No. 11(c): Approval of Change Order No. 3 to the Advanced Primary Treatment
Chemical Addition Facilities at Plant No, 1, Job No. P1-28 and Advanced Primary
Treatment Chemical Addition Facilities at Plant No. 2, Job No. P2-36.
Charge Order No. 3 adds $14,196 and 17 calendar days to the contract for
the Advanced Primary Treatment Chemical Addition Facilities at Plants Nos. 1
and 2. This contract includes installation of chemical handling and storage
facilities which will increase the efficiency of the primary sedimentation
basins.
The first of four items under this change order is in the amount of $5,268
for additional work required to enlarge a polymer drain in the polymer truck
unloading area at Plant No. 1 for additional protection in case of an accidental
spill during the operation of filling the polymer storage tanks. Additional
pipe guard protection posts were also installed to protect the pump control
panel from accidental damage from trucks backing up. The second item is the
addition of a floor drain in the new polymer pump building at Plant No. 2 to
accommodate cleaning and maintaining the building floor if polymer spillage
should occur, at a cost of $1,276. The third item, at a cost of $5,478, is the
modification of two access doors that interfered with the electrical equipment
because they opened inwardly. The doors were repositioned and modified to open
outwardly and the original openings were filled with reinforced concrete. The
final item is the addition of a PVC pipe line from Pump A in the ferric chloride
punp roan to the Splitter Box A, at a cost of $2,174.
Staff recammends approval of Change Order No. 3 adding $14,196 and
17 calendar days to the contract with Ziebarth and Alper.
No. 11(d): Approval of Change Order No 11 to the Installation of
Replacement Belt Filter Presses at Plant No. 2, Job No. P2-28-1.
Change Order No. 11 adds $10,956 to the contract for replacement of three
obsolete and worn out sludge dewatering centrifuges with five newer, more effi-
cient belt presses at Plant No. 2.
Included in this change order is the addition of a bubbler level control
system for the two centrate pumps at a cost of $5,589. The oentrate pumps
dispose of effluent from the District's only remaining sludge centrifuge, which
-2-
July 8, 1987
was converted under this contract for use solely in cleaning digesters. the
�. second item in the change order is the modification of the belt press drains
with special fittings and hoses, necessary to avoid interference with the
concrete basin walls and the filter press belt on the underside of the unit.
the cost to supply labor and materials was $5,367 for this item.
Staff recommends approval of Change Order No. 11 adding $10,956 to the
contract with 2iebarth and Alper. There is an 18 calendar day time extension
associated with this change order.
No. 11(e): Approval of Change Order No. 1 to Removal of Grit at Plant
No. 2, Specification No. M-029.
In May, the Districts awarded Removal of Grit at Plant No. 2, Specification
No. M-029, to Falcon Disposal Services, Inc. for the contract amount of
$2,027,520. Section 3-4(c) of the General Provisions and Standard
Specifications requires motor vehicle public liability and property damage
insurance in the amount of $1 million for one person and $3 million for more
than one person, our standard requirement for construction work. However, this
contract is for hauling only and does not involve construction activities for
which the General Provisions and Standard Specifications are intended to apply.
Falcon is also under separate contract with the Districts to haul and dispose of
sewage sludge. However, the sludge hauling contract requires only $1 million of
coverage for automobile liability insurance.
on June 17, the Districts received a request from the contractor to reduce
the aggregate liability insurance from the specified $3 million to $1 million
because they have been unable to obtain coverage at the higher limit. Although
the higher limits would be desirable, because of the contractor's inability to
obtain said coverage, and the fact that there is little difference in liability
exposure between the two contracts, staff recommends that the liability
insurance requirement for this job (M-029) be revised to the $1 million limit.
Staff recanmends approval of Change Order No. 1 deducting $5,000 from the
contract with Falcon Disposal Services, Inc. for reducing the liability
insurance limit from $3 million to $1 million.
No. 11(f): Approval of Plans and Specifications for Lighting Conservation
Facilities at Plants 1 and 2, Job No. J-16.
In April 1986, Boyle Engineering Corporation was awarded a contract to
perform a study and prepare plans and specifications for lighting conservation
facilities at Plants 1 and 2 to improve the efficiency of the extensive lighting
installations at both treatment plants. All existing lighting fixtures,
circuits, controls and required usage were studied and lighting loads were
determined. The plans and specifications have been prepared to improve the
economics and safety aspects of the lighting systems required at both plants.
This job involves the elimination or relocation of fixtures for improved
lighting effectiveness and efficiency. Less efficient mercury vapor lamps are
to be replaced with more efficient high pressure sodium lamps (however, in some
cases, high pressure sodium lamps are replaced with mercury vapor lamps for
-3-
July 8, 1987
improved color rendition and safety around moving equipment) . Circuits are to
be modified with timers and other controls to reduce energy consumption for use
only when someone is present, where permissible. The estimated payback for the
cost of this project is less than five years.
Staff recannends approval of the plans and specifications and authorization
for the General Manager to establish the bid date for Job No. J-16. A tentative
bid date of August 25, 1987 is scheduled. The engineer's estimate for this work
is $600,000.
No. 11(g): Acceptance of Rehabilitation of No. 4 Trickling Filter at
Reclamation Plant No. 1, Specification No. Iz-024 as Complete.
Dorado Enterprises, Inc. has fulfilled all contractual obligations for
rehabilitation of the No. 4 trickling filter at Plant No. 1 within the specified
contract time. Staff, therefore, recannends adoption of the resolution attached
to the agenda material authorizing acceptance of the work as complete, execution
of the Final Closeout Agreement and filing of the Notice of Completion, as
required. The final contract price is $75,700. There were no change orders.
No. 11(h) : Approval of Addehoums Nos. 1 and 2, and Award of Contract for
Underground Tank Replacement at Plant No, 1, Specification No. R-025-1 and
Underground Tank Replacement at Plant No. 2, Specification No. R-025-2.
In June, the Directors approved plans and specifications for Underground
Tank Replacement at both Plants 1 and 2, Specification Nos. R-025-1 and R-025-2.
This contract is the first phase of a program to replace underground storage
tanks (gasoline, diesel and oil) to comply with new state laws and to upgrade
our fuel storage system. Under this contract six tanks at Reclamation Plant
No. 1 with a capacity of 23,750 gallons will be removed and will be replaced
with two new 12,000 gallon tanks. One 2,000 gallon tank at Treatment Plant
No. 2 will be removed and replaced with a new 12,000 gallon tank. The project
also includes a computerized fuel inventory management and dispensing system
which controls access to fuel with a card key security system. The second phase
will be to replace the remaining eight tanks at the two plants.
1. Addendum No. 1
Addendum No. 1 revises the schedule of work and includes miscellaneous
technical clarifications. The addendum also requires that the contractor
coordinate inspection with local fire departments and the County to insure the
tanks are installed in accordance with appropriate regulations.
Staff recrnmends approval of Addendum No. 1.
2. Addendum No. 2
Addendum No. 2 adds liquidated damages and completion tines which were
omitted from the contract documents.
3. Award of Specification Nos. R-025-1 and R-025-2
Cn June 23, two bids were received for Underground Tank Replacement at
Plant No. 1, Specification No. R-025-1 and Underground Tank Replacement at Plant
-4-
July 8, 1987
No. 2, Specification No. R-025-2. The bids ranged from a high of $549,591 to a
low of $305,185 subnitted by Sancon Engineering, Inc. A complete bid tabulation
is attached to the agenda.
Staff reconnends award to Sancon Engineering, Inc. in their low bid amount
of $305,185. The engineer's estimate for this work was $307,700.
No. 11(i): Award Blueprinting, Photocopying and Related Services,
Specification No. 5-041.
Outside blueprinting, photocopying and related services are used for the
purpose of high volume reproduction of engineering construction project plans,
various reports, and binding services required during the year that cannot be
performed as 'economically with the Districts' copying equipment. Consolidating
purchase of copying services and awarding an annual contract to a single vendor
through the formal bidding process has resulted in a reduction of staff time and
paperwork in individual ordering and invoice processing for payment of these
services each time they are needed.
Pour bids were received June 9, 1987 for a one-year period, beginning
July 16, 1987, with an option for a one-year extension. Unit prices bid for the
high volume reproduction services and xeroxing of specifications are identical
to the existing contract prices. Unit prices on the remaining items range from
being the sane to approximately 20% less than current prices. Based on the
estimated volume of expected future usage, the bids ranged from a low of
$74,348.22 to a high of $269,839.16. Consolidated Reprographics is the overall
low bidder. A bid tabulation is attached to the supporting agenda documents.
Staff recommends award to Consolidated Reprographics for a one-year
contract for an amount not to exceed $75,000 for all services bid under this
specification, with option to renew for one additional year.
No. 11(j) : Approve Selection Committee Certification for Addendum No. 3 to
Architectural Services Agreement for Administration Building Addition, Job
No. J-7-4.
The Boards have previously approved an Architectural Services Agreement with
Pulaski and Arita Architects, Inc. to design a new addition to the administra-
tion building. Separately, the Directors have also authorized planning for
central power generation systems at both plants. One of the by-products of the
central generation projects is heat which can be recovered and used to provide
heating and cooling for the administration building.
Recovery and use of the heat will allow the central power generation systems
project to qualify for reduced natural gas purchase rates under a federal
Program which would economically benefit the Districts. Staff therefore
requested the architect redesign the administration building's heating,
ventilating and cooling (HVAC) system to utilize waste heat and take advantage
of the federal program. The redesign requires additional structural, mechanical
and electrical engineering services for the new HVAC system, which will be
housed in a separate facility remote from the administration building addition.
v
-5-
July 8, 1987
The Selection Committee has negotiated Pudendum No. 3 in the amount of
$10,867 for the additional work, on an hourly-rate basis for labor, including
overhead at 150%, plus fixed profit, increasing the total authorized
compensation from $237,000 to $247,867.
The action appearing on the agenda is to receive and file the Selection
Committee Certification of the final negotiated fee for the above work, and
adoption of a resolution approving Addendum No. 3 to the Architectural Services
Agreement with Pulaski and Arita Architects, Inc. Copies of the certification
and resolution are attached with the supporting agenda documents.
No. 11(k) : Receive and File Selection Committee Certification and Approving
Professional Services Agreement with Pulaski and Arita Architects, Inc. for
Phase I Improvements of Master Plano Support Facilities, Site and Security
Improvements at Treatment Plant No. 2, Job No. P2-35-1.
In April, upon a recommendation of the Building Commitee, the Directors
approved the Master Plan of Support Facilities, Site and Security Improvements
at Treatment Plant No. 2 and authorized the Selection Committee to negotiate
with Pulaski and Arita Architects, Inc. of Newport Beach, for the Phase I
Improvements.
Pulaski and Arita prepared the Master Plan of Support Facilities, which
included recommendations for plant security, circulation, parking, landscaping,
warehousing and shops necessary to support the treatment plant activities. The
plan recommends emphasis on improving the public image of the plant through
visual enhancement around the perimeters and localized improvements within the
plant which would be seen on tours. Phase I improvements concentrate on the
perimeter improvements, including new landscaping at the entrances, construction
of additional walls and landscaping along the southerly boundary (just north of
Pacific Coast Highway and the public beach) , and landscaping in the vicinity of
the surge towers. In addition, certain signage and interior landscaping as
related to future tour routes are included. The estimated project cost is
approximately $1 million. landscaping improvements are also recommended all
along the Santa Ana River perimeter, however, they are left for future phases
since the area will be under construction for sane time. Other future phases
will also include, construction of the support facilities.
The requested services for Phase I include design and construction support
for the project and includes regular plant visits to inspect the work. The
Selection Committee has negotiated a fee not to exceed $93,375 for the
landscaping design and construction work, based on hourly-rates for labor plus
overhead at 150%, plus direct expenses and fixed profit.
The actions appearing on the agenda are to receive and file the Selection
Committee Certification of the final negotiated fee for the above work, and
adoption of a resolution approving an agreement with Pulaski and Arita,
Architects, Inc. to provide the necessary architectural and design services for
the project. Copies of the certification and resolution are attached with the
supporting agenda documents.
-6-
July 8, 1987
No. 11(1) : Receive and File Selection Committee Certification and Award
IIgineeri Services Agreement for Miscellaneous Modifications and Improvements
to Facilities at Treatment Plant No. 2, Job No. P2-37.
In May, the Directors authorized the Selection Committee to solicit
proposals and negotiate an agreement for Miscellaneous Modifications and
Improvements to Facilities at Treatment Plant No. 2. The work includes
improvements to the primary and secondary treatment facilities, dissolved air
flotation sludge thickeners, sludge dewatering equipment, digestion facilities,
utilities, pumping improvements and building repairs. There are 45 separate
items of work contained in the scope. The list is an accumulation of several
relatively minor modifications deemed necessary by the operation and maintenance
staffs, plus a few large items of treatment plant improvements identified in the
Districts' long-range master plan. All of the work is on existing process
equipment and as such will require a great deal of design and construction
coordination. Staff has estimated the construction cost at $7.5 million,
sunnarized as follows:
In the primary system, proposed improvements to scum handling from
Clarifies F and G will cost an estimated $170,000.
Secondary system improvements include installation of larger activated
sludge pumps, a by-pass line to a distribution box to keep the waste
activated system operating if the thickener system is down, and improvements
in the final clarifier effluent troughs to increase flow capacity. It is
estimated that the secondary treatment improvements will cost about
$900,000.
Other improvements are planned for the dissolved air flotation thickeners.
These facilities concentrate sludge from the waste activated plant before it
is placed in the digesters. The improvements include better ventilation and
access modifications at an estimated cost of about $20,000.
Improvements proposed for the sludge dewatering facilities include
installing a standby comminutor, flow meters on wastewater lines, monitoring
unit for the dewatering filtrate system and a polymer trial system to assist
in future polymer evaluation, all at a cost of about $50,000.
The sludge digestion process improvements include installation of various
piping changes to allow for better injection of chemicals to inhibit
formation of hydrogen sulfide, installation of gas meters, replacement of
various valves which are no longer serviceable, new drip traps in the
digester gas lines, emergency overflow relief systems to protect the dames,
piping changes, and major repairs to Digester A dare which has leaked and
nay be structurally inadequate because the dame reinforcing steel appears to
have corroded. Estimated cost for improvements to the digestion system is
$1.7 million.
Flow meters are to be installed in the lines which lead from the three
splitter boxes at "C" HeadWOrkS. This will allow operations staff to better
control the water to the basins. Estimated cost is $210,000.
�.s
-7-
July 8, 1987
Various improvements to utilities systems including additional air
conditioning for the operations center computer, additional chemical meters
and replacement of alarms in tunnels with chlorin solution lines is
estimated to cast $300,000.
At "C" Headworks, several large projects, including the replacement of the
five bar screens, are planned. The Directors will recall that under
separate authority staff was authorized to negotiate to buy five new
screens to replace the existing ones. The design would include the
installation of the screens; replacement of existing No. 2 and No. 4 pumps
with new, larger pumps and motors; replacing the bar screens conveyor and
eight sluice gates which have deteriorated beyond repair, and improvements
to correct deterioration of the building itself, including removal of
eyebrows on the south and east side. In total, headworks improvements are
estimated at about $4 million.
There are several other minor projects included within the draft Scope of
Fork relating to access, storage of equipment and drainage at a cost of
about $100,000.
The Selection Committee solicited proposals from four firms familiar with
the Districts' operations, all of which responded to the request for proposals.
The Ocumittee has negotiated a fee with Brown and Caldwell Consulting Engineers
based on hourly rates including labor and overhead at 185%, plus direct expenses
and fixed profit, for a total amount not to exceed $364,000.
The actions appearing on the agenda are to receive and file the Selection
Committee certification of the final negotiated fee for the above work, and
adoption of a resolution approving an agreement with Brown and Caldwell
Consulting Engineers to provide the consulting engineering services for design of
Miscellaneous Modifications and Improvements to Facilities at Treatment Plant
No. 2, Job No. P2-37. Copies of the certification and resolution are attached
with the supporting agenda documents.
No. 11(m): Approve Change Order No. 1 to Purchase Order No. 26444 with
Carleton Engineers 6 Consultants Inc. , Purchase of NOx, Job No. J-19A-1 and
Purchase of Non-Methane Hydrocarbons, Job No. J-19A-2, re Central Power
Generation Systems.
In October 1986, at the recommendation of the Executive CcMMittee, the
Directors authorized the issuance of Purchase Order No. 26444 to Carleton
Engineers & Consultants Inc. in an amount not to exceed $18,000 for assistance
in obtaining both oxides of nitrogen (NOx) and non-methane hydrocarbons (NMHC)
emission credits for the proposed Central Power Generation Systems, Job
No. J-19. While the Central Power Generation Systems greatly reduce the
emissions to the air basin, under South Coast Air Quality Management District -
(sCAQMD) rules offsite credits must still be purchased for the proposed
facilities, a Federal Energy Regulatory Ornmission (FERC) qualifying facility
that will generate up to 17.5 megawatts of power.
On May 11, 1987, the Districts did in fact submit a second application to
the ScWm for the Central Farr Generation Systems. That application must show
-8-
July 8, 1987
that the project emissions are fully offset in accordance with SCACMD rules.
Carleton Engineers have been extremely valuable in assisting staff in obtaining
the necessary emissions credits. An agreement for the purchase of the necessary
NOx has already been consummated. A second agreement for up to 180 tons per
year of non-methane hydrocarbons (NMHC) is nearly concluded. Additional NMHC
are needed, and staff believes that they can be secured in a timely manner.
When the agreement with Carleton Engineers was authorized by the Directors
to assist in securing the emissions credits, a limit of $18,000 was included.
the amount was based on an estimate of the amount of effort that would be
required to locate, negotiate and process the credits through the SCAQND permit
system for the Districts' application for the Central Power Generation Systems.
It has been determined that a great deal of backup analysis will be necessary to
show that the purchased emissions are indeed eligible under SCAOM rules.
Normally, the procedure would be to authorize the Selection Cammittee to
negotiate for the additional work and return next month to the Boards with a
recrnmended change order. However, because the application is on a set time
schedule fixed by SCACMD and any delay would require re-filing and additional
delays in the Central Power Generation Systems project, staff is recammending
approval of Change Order No. 1 in the amount of $17,000 which will increase the
purchase order contract authorization to $35,000.
No. 11(n) : Authorizing the Selection Crnmittee to Negotiate Addendum
No. 1 to the IIgineering Services Agreement for Entrances, Site, Security and
Interior Road Improvements at Plant No. 1, Job No. P1-27.
In July 1986, the Directors approved an Engineering Services Agreement with
Boyle Engineering ODrporation for the design of Job No. P1-27, Entrances, Site,
Security and Interior Road Improvements at Plant No. 1. This project includes
design of a new main entrance at Plant No. 1, new interior traffic circulation
roads, landscaping and security improvements. We have now determined that a
much larger effort than originally envisioned has been necessary to secure a
CALTRANS permit for the proposed new entrance on Ellis Avenue, opposite the San
Diego southbound freeway on/off ramp. 1b date, tentative concept approval has
been received from CALTRANS. However, the necessary studies and additional work
to support the formal permit application and processing, coupled with past work
to receive the tentative concept approval, will exoeed the allowance set forth
in the Districts' original scope of work and the contract documents.
In addition, staff has requested certain changes in the work to accammmodate
schedules and interfacing with other concurrent on-going construction projects.
lhcse projects, including the new headworks which is now out to bid and the
ministration building addition, require close coordination and additional site
Plan work to insure that construction can proceed on these projects with a
minimum of disruption of other activities and plant operations.
'fie staff is therefore recaumending that the Selection Committee be
authorized to negotiate an addendum for the additional engineering services
associated with coordinating this work with cALTRANS and the other concurrent
construction projects. Following the Selection Committee's negotiations the
Proposed addendum will be presented to the Boards for consideration.
-9-
July 8, 1987
No. 11(o) : Authorizi Staff to Execute a Grant of Easement to Southern
California Edison For Adrtmin stration laboratory Facilities Electrical Sery ce.
For years the Administration Building and the Laboratory have been on
the same power source as the wastewater treatment plant. The electrical
system, with its extremely large and fluctuating demand, is subject to
frequent power surges and depressions when major equipment is started or
turned off, or when emergency generators are utilized or exercised. In
addition, we must routinely connect to generator power for interim periods
for periodic maintenance of electrical switchgear and other equipment and to
allow electrical tie-ins of newly-constructed plant facilities. These power
fluctuations and switchovers greatly affect our canputers, word processors
and lab instruments. The machines are shut dawn, sometimes with a loss of
valuable input and/or processing time.
To remedy the problem, a separate power source from Edison is necessary
which is available if the Districts will grant Edison an easement to service
an additional transformer and meter.
The action appearing on the agenda is to authorize the General manager
to execute an easement allowing Edison access to the transformer and meter.
Staff recamends that the General Manager be granted the authority to execute
the easement.
DISTRICT 1
No. 11(p) : Approval of Addendum No. 1 and Award of Santa Ana/Dyer Road
Trunk Sewer Manhole Rehabil tation, contract No. 1-15R.
In May, the Directors approved the plans and specifications for the Santa
Ana/Dyer Road Trunk Sewer Manhole Rehabilitation. This sewer, constructed in
1953 prior to the development of protective coatings to prevent corrosion of
concrete by sewer gases, has been in continuous service for 34 years. Recent
inspections found that the condition of the unlined pipe is generally
satisfactory, but the manhole shafts are in need of repairs. The survey
indicated that the shafts have suffered extensive corrosion and on many of the
manholes the cone provided only a 24-inch opening, whereas a 36-inch is most
desirable for maintenance. The plans and specifications call for cleaning of
the shafts and replacement of the cones and 24-inch covers with 36-inch covers
and lining of the shafts and cones with a protective coating.
1. Addendum No. 1
Addendum No. 1 to the plans and specifications for the Santa Ana/Dyer
Road Trunk Sewer manhole Rehabilitation increases the number of manholes to be
rehabilitated fran 23 to 25. In addition, minor technical clarifications and
other information is included in the Addendum.
Staff recommends approval of Addendum No. 1
-1D-
July 8, 1987
2. Award of Contract No. 1-15R
Although this type of work is somewhat specialized, plans and
specifications were taken out by four firms. However, on June 23, only one bid
was received for Santa Ana/ yer Road Trunk Sewer Manhole Rehabilitation,
Contract No. 1-15R, submitted by Sancon Engineering, Inc. in the amount of
$139,000.
The bid exceeds the engineer's estimate of $100,000 by 39%. Because of
the relatively small size of this repair job and the specialized nature of the
work, there has been limited bidders interest. for these reasons, staff
believes that if the project were rebid, it would probably result in an even
higher bid.
therefore, staff recommends award to Sancon Engineering, Inc. in the
bid amount of $139,000. Sanoon specializes in this type of work and has been
the successful bidder in virtually all past Districts' projects of a similar
nature and scope.
DISTRICT 2
No. 11(q): Approve Amendment No. 1 to the Consolidated Master Plan of
Trunk Sewers for Count Sanitation Districts Nos. 2, 3 and 11 relative to the
District No. 2 Euclid ope-Placentia Drainage Area.
In March the Directors considered Amendment No. 1 to the District's Master
Plan of Trunk Sewers. Last month the EIR was approved and the remaining action
is to finally approve the amendment.
Staff reccumends the action before the Board to approve Amendment No. 1 to
the Consolidated Master Plan of Trunk Sewers for County Sanitation Districts
Nos. 2, 3 and 11 relative to the District No. 2 E.nclud/Newhope-Placentia
Drainage Area.
No. 11(r): Approve Agreement for Cooperative Project with the City of
Garden Grove for a Portion of Euclid Interceptor Sewer, between Lamson Avenue
and Orangewood Avenue, Contract No. 2-26-1, and City Storm Drain.
In March 1987, the Directors granted staff and General Counsel authority to
negotiate an agreement with the City of Garden Grove pertaining to a cooperative
project for the installation of a portion of the District's Euclid Interceptor
Sewer, and a storm drain serving the City's needs. This portion of the Euclid
Interceptor Sewer, as set forth in Amendment No. 1 to the Master Plan of Trunk
Sewers for County Sanitation District No. 2, will join the southern terminus of
a similar cooperative project between the District and the City of Anaheim south
of Ratella Avenue at approximately orangewood Avenue, now under design.
Extensions of the Euclid Interceptor both southerly and northerly of the
above-mentioned projects will be undertaken in the future.
The City of Garden Grove plans to construct a storm drain between Lamson
Avenue and Chapman Avenue. The proposed cooperative project is an outgrowth of
discussions between the District and the City with the goal of minimizing
construction and traffic disruptions, and public inconvenience, that might be
caused fran each agency's work. Preliminary cost estimates are $3.2 million for
.� the interceptor sewer and $1.8 for the storm drain.
-11-
July 8, 1987
The General Counsel has prepared an agreement which has been reviewed by
the City of Garden Grove. The agreement provides for inclusion of both projects
in District No. 2's construction contract. The City of Garden Grove will
reimburse the Sanitation District for the cost of the storm drain including
inspection and other administrative charges. The District and the City have
each been responsible for the design of their respective projects.
The action appearing on the agenda is to approve the cooperative agreement
between the City of Garden Grove and Sanitation District No. 2 providing for
the joint construction of a Portion of the Euclid Interceptor Sewer, Contract
No. 2-26-1, between lampson Avenue and Orangewood Avenue (south of Katella
Avenue) and a City of Garden Grove storm drain between I mpson Avenue and
Chapman Avenue. Staff recommends approval of the cooperative agreement.
No. 11(s): Actions Pertaining to Proposed Cooperative Project with City
of Brea re North Branch of the Iollino Hills Drive Subtrunk Sewer, Contract
No. 2-11-3, and City Sewer Projects.
Amendment No. 1 to the Consolidated Master Plan of Trunk Sewers for County
Sanitation Districts Nos. 2, 3 and 11 sets forth the need for interceptor sewers
to meet the District's needs, including the paralleling of the North Branch of
the Rolling Hills Drive Subtrunk Sewer. The North Branch of the Polling Hills
Drive Subtrunk Sewer is located in the reservoir behind Fullerton Dam, now known
as Craig Regional Park. The line collects sewage fram two City of Brea
facilities, the Associated Road Trunk Sewer which serves a drainage area
easterly of the Orange Freeway, and the State College Boulevard Trunk Sewer
which serves the drainage area westerly of the Orange Freeway, including the
Brea Mall. Both city facilities also need to be paralleled or improved.
The City of Brea has approached the District and proposed a joint project.
Under the proposal, each agency would prepare contract plans and specifications
for its respective facilities, and the Sanitation District would issue and
administer a contract to jointly construct all or portions of the needed
facilities. The City Engineer for the City of Brea will prepare plans for that
City's facilities. Accordingly, staff believes it would be most beneficial if
the same engineer, San W. Peterson & Associates, prepared plans for the
District No. 2 projects.
The North Branch of the Rolling Hills Drive Subtrunk Sewer is approximately
1200 feet long extending from Rolling Hills Drive (extended) northerly to
approximately Elm Street (extended) . The existing sewer is 18 inches in
diameter. A 15-inch sewer is called for in Amendment No. 1 to parallel this
facility. The sewer is located in a 20-foot wide easement from the Corps of
Engineers to county Sanitation District No. 2; additional easements and permits
may be necessary.
Portions or all of the City's projects, paralleling the Associated Road
Trunk between Craig Park and Imperial Highway and the State College Trunk in
State College Boulevard northerly to Lambert Road may be included in a camnon
contract with the District. City sewer work, while substantially greater than
District No. 2's, can be designed and managed together, provided all the
necessary arrangements can be worked out between the City and District for
contract administration. Manpower scheduling may require more than one contract
because of limits on District's staff.
-12-
July 8, 1987
The actions appearing on the agenda are to authorize the Selection
... Cmmittee to negotiate with Sam W. Peterson & Associates for the necessary
engineering services for the Relief of the North Branch of the Rolling Hills
Drive Subtrunk Sewer, Contract No. 2-11-3; and to authorize the staff and
General Counsel to negotiate and prepare a cooperative agreement with the City
of Brea for the joint oonstruction of the District and City sewage facilities.
Staff recammends approval of the agenda actions.
DISTRICT 3
No. 11(t) : Amending Authorization for Emergency Repairs and Abandorment
of La Habra Purchase Line "W, Contracts Nos. 3-32R and 3-32R-1.
At the adjourned meeting on May 20, 1987, staff reported that a break in
the La Habra Purchase Line "W had been discovered and the Directors authorized
emergency repairs of the line and cleanup operations, in an amount not to exceed
$100,000. In accordance with that authorization, staff proceeded with temporary
emergency repairs and the line has now been restored to limited service.
Line "W' was constructed by the old Is Habra Sanitary District prior to
1926 and no plans or other information are available on this line. The line is
within an easement located southerly of Imperial Highway and westerly of Beach
Boulevard adjacent to the Coyote Creek Flood Control Channel. In this area it
meanders through undeveloped land owned by Chevron Oil Co., and it is in this
vicinity that the break occurred. Staff restored the line so that only a very
limited drainage area would be served by Line "W to minimize the load on it,
and removed contaminated soil to a sanitary landfill. Clean fill dirt was
brought in to replace the excavated soil.
In accordance with the discussions at the May 20 meeting, staff
investigated the alternatives of a permanent repair or abandonment of the line.
Most of the tributary drainage area has been diverted from the line since TV
inspection has shown much of the sewer line to be beyond repair and, thus,
abandonment is recrnmended by staff.
The District's 1983 Master Plan, soon to be updated, recognized that an
additional sewer line would be needed along Beach Boulevard to serve portions of
La Habra, Brea and adjacent communities. %ben the new line is completed, Line
"W— and adjacent Line "E" of the same vintage - are to be abandoned. ("W is
the westerly line and "E" is the easterly line.) The other existing sewer line
along the corridor, the Miller-Holder Trunk Sewer constructed in the 1960's, is
in good shape, and the manholes on the Miller-Holder line are being
systematically rehabilitated. Staff believes that the new master planned line
will solve the longer-term sewering needs for this area. However, as an interim
solution, the remaining flow in Line "W' should be diverted to Line "E" at a
location south of Imperial Highway where Line "W is in public right-of-way.
Staff estimates that the abandonment and diversion can be accomplished without
an increase in the original emergency repair authorization of $100,000. A
permit from CALTRANS will be necessary.
Staff is therefore recommending the action appearing on the agenda, to
award the May 20th Board actions and authorize staff to solicit informal bids
-13-
July 8, 1987
and to issue purchase orders to contractors to effect the abandonment of Line
"W south of Imperial Highway at a location where the tributary drainage area
can be diverted to Line "E", provided the total cost for the repair and
abandonment shall not to exceed the original authorization of $100,000 granted
by the Board on May 20, 1987.
DISTRICTS 5 AND 6
No. 11(u) : Ratification of Actions relative to Repairs of Coast Highway
Force Main, Trunk "A", and Bitter Point Pump Station, Contract No. 5-30R.
Our Collection Facilities Maintenance Division crews recently noticed that
the southerly barrel (Trunk "A") of the Coast Highway Force Main within the oil
field between Pacific Coast Highway and the Santa Ana River was not functioning
properly. High water was observed and an obstruction or collapse of a portion
of the line is suspected. This line, installed in approximately 1936, is known
to be in poor condition and is master planned for rehabilitation or replacement
in the near future. After portions of the line were found to be unrepairable at
other locations southerly of this section when the northerly Coast Highway Force
Main was rehabilitated in 1985 and 1986.
The location of the collapse is not yet known, nor is the extent of the
damages. In order to isolate the line, a gate valve within the Bitter loin
Pump Station must be modified or replaced. The necessary repairs include
installing by-pass pumps around the pump station to isolate the valve.
Staff reviewed the situation with the Chairmen of Districts 5 and 6 and
approval to proceed with immediate repairs on an urgency basis was granted and
the work is now underway.
Staff believes that the repair work, including the work underway, can be
completed in an amount under $70,000. Accordingly, the action on the agenda is
to ratify staff's actions in proceeding with repairs to the Bitter Point Pump
Station and Coast Highway Force Main, Trunk "A", in an amount not to exceed
$70,000.
DISTRICT NO. 7
No. 11(v): Acceptance of Bear Street Relief Trunk Sewer, Contract
No. 7-6-1A.
A s R, a California Limited Partnership, the developer of the new shopping
and residential complex located on the southwest corner of Bear Street and
Sunflower Avenue northerly of the San Diego Freeway, has constructed a 15-inch
sewer extending from the intersection of South Coast Drive and Bear Street
northerly to the Sunflower Interceptor Sewer in Sunflower Avenue. Staff
requested that the sewer be built to direct flows northerly to the Sunflower
Interceptor which has available capacity, rather than to an existing sewer
within Bear Street which drains southerly to the District's heavily-loaded
Gisler-Red Hill Trunk Sewer. The local sewering agency, Costa Mesa Sanitary
District, requested that the sewer be a District trunk sewer for maintenance
reasons.
-14-
July 8, 1987
A & R has requested that District No. 7 accept the facility which was
constructed according to District's standards at no cost to the District. This
sewer, extending some 1,200 feet, will serve the new shopping canplex as well as
existing and future residential and co mercial developments within the area
bounded by the San Diego Freeway on the south, Bear Street on the east and
Fairview Road on the west.
Staff recommends acceptance of the grant deed conveying the sewer to
District No. 7, at no cost to the District.
ALL DISTRICTS
No. 13 and 14: Report and Recc mendations of the Executive Committee.
The Committee met on June 24th, and enclosed for Board members is a written
report of their discussions and recrnmended actions for consideration by the
Boards.
No. 15: Adoption of Gann Initiative (Proposition 4) Annual Appropriations
Limit.
The Gann initiative limits state and local government appropriations of
proceeds from tax sources to an amount based on changes in population and the
cost of living war the 1978-79 base year. Each year the Boards must fix the
limit in accordance with the initiative. In 1987-88, "proceeds of taxes" are
well within the appropriations limits as set forth below.
1987-88 District Net 1987-88
District No. Tax Appropriations Budget Gann Limitations
1 $ 0 $ 1,915,000
2 2,842,000 7,965,000
3 4,560,000 10,031,000
5 1,432,000 2,063,000
6 325,000 1,201,000
7 1,739,000 2,396,000
11 857,000 2,108,000
13 Not Applicable Not Applicable
14 Not Applicable Not Applicable
The Resolutions appearing on the Agenda are to establish the Gann
appropriation limits for 1987-88.
DISTRICTS 1, 5, 6 AND 13 (ONLY)
No. 16: Directing County Auditor-Controller to Include District's 1987-88
Sewer Service iirecti on Property Tax Bill.
The action appearing on the Agenda is the routine resolution directing the
County Auditor-Controller to include the annual sewer service charges on the
property tax bill for 1987-88 pursuant to the user fee ordinances previously
adopted by the respective Boards of Districts 1, 5, 6 and 13.
-15-
July 8, 1987
AIL DISTRICTS
No. 17: Report and Reconmendationrs of the Building Committee.
The Committee met on June 18th, and enclosed for Board members is a
written report of their discussions and recommended actions for consideration by
the Boards.
No. 18: Report and Reca me:dations of the Fiscal Policy Committee Re
1987-88 Wbrkers' Compensation Excess Insurance Coverage.
The Workers' Compensation excess coverage insurance policy expired on
July 1, 1987, At last month's meeting it was reported that because of the way
the insurance marketplace works, quotations for the 1987-88 coverage were not
received in time for consideration by the Boards at the regular June meeting.
Inasmuch as the coverage was scheduled to expire between the Boards' June 10 and
July 8 regular meetings, the Boards authorized the Fiscal Policy Cannittee to
evaluate proposals obtained by the Districts' insurance broker and place
appropriate excess workers' oanpenrsation coverage effective July 1, 1987. The
authorization provided that the actions taken by the Fiscal Policy Committee
would be submitted to the Joint Boards for ratification or revision at the
regular meeting on July 8. This is similar to procedures followed by the Boards
in past years.
Enclosed is the Fiscal Policy Committee's recanmendation and action in
placing the Workers' Compensation excess coverage insurance effective July 1,
1987 for consideration by the Boards. The items appearing on the agenda are to
review and file the report and to ratify the Committee's action.
No. 19: Agenda for Closed Session.
Fran time to time it is necessary for the Boards to convene in closed
session to consider purchase and sale of real property, potential or pending
litigation, personnel matters or other matters which are exempt from public
disclosure under the California Public Records Act. In order to avoid a
situation where a closed session is needed but does not appear on the agenda,
this standing item is placed on the agenda each month providing for a closed
session at the regular meeting, if deemed necessary by the Boards.
DISIRICr 3
No. 26: Adiournment to July 15, 1987.
At an adjourned meeting in May, the Board reviewed its long-range financial
requirements for funding the District's projected operating and capital
construction needs. Staff was directed to draft revisions to the District's
long-range financial plan to include supplemental user fees and modifications to
the connection fee schedule, and an implementation plan for consideration by the
Board at the adjourned meeting, tentatively scheduled for July 15 at 7:00 p.m.
-16-
July 8, 1987
�../ DISTRICT 7
No. 37: Actions Pertaining to North Airport Diversion Sewer, Contract
No. 7-10 and South Airport Diversion Sewer, Contract No. 7-10-1.
In June, the Directors approved plans and specifications and took other
actions relative to the construction of the North and the South Airport
Diversion Sewers, Contracts Nos. 7-10 and 7-10-1 respectively, required as a
result of the new John Wayne Airport terminal being built by the County of
Orange near the intersection of MacArthur Boulevard and the 405 freeway.
These sewers will intercept flows fran the District's existing South Irvine
Subtrunk (Extension of the Michelson Drive Subtrunk) which now transverses the
site of the proposed terminal.
The North Airport Diversion Sewer will be constructed easterly from the
intersection of Michelson Drive and MacArthur Boulevard in Business Center
Drive, and thence easterly in private easements (yet to be obtained) with an
outlet at the newly-constructed Von Kaman Trunk Sewer south of the 405 freeway.
In the future, a second diversion sewer, the South Airport Diversion Sewer,
Contract No. 7-10-11 will be constructed in Campus Drive easterly to intercept
flows fran the MacArthur Trunk Sewer, which transverses the airport runways.
Also in June, pursuant to CEQA procedures, the Directors received and filed
an Environmental Analysis and proposed Negative Declaration for the projects.
The Negative Declaration has been posted and circulated for public cc ment in
accordance with CEp4 procedures. A copy is enclosed with the agenda material,
along with a Staff Summary of the Environmental Consultant's findings and
recommendations, and responses to the comments received.
On April B, the Board authorized the General Counsel and staff to negotiate
for acquisition of easements to build the portion of the North Airport Diversion
Sewer that will be located in private property. As of this writing, not all of
the negotiations have been concluded. Therefore, the General Counsel will give
a verbal status report at the Board meeting and recommend final necessary Board
actions which have tentatively been listed on the agenda.
The other actions before the Board are to receive and file the public
comments on the Negative Declaration; receive and file the Staff Summary;
and consideration of a resolution approving the Negative Declaration and
authorizing filing of the Notice of Determination in accordance with CEC14
procedures.
Further, the County has given the District a very short time in which to
relocate the South Irvine Subtrunk Sewer. Therefore, it is reconnended that
the General Manager, with the concurrence of the District Chairman, be granted
authority to award the North Airport Diversion Sewer, Contract No. 7-10 to the
lowest responsible bidder, to avoid any unnecessary delays in proceeding with
the job. Acoordingly, a resolution is attached to the agenda that would
authorize this if the Board approves. The Board has previously authorized
bidding for the estimated $600,000 project.
Staff rect mends approval of the actions.
-17-
RE: AGENDA ITEM NO. 7
u
STATEMENT OF QUALIFICATIONS
OF NOMINEE FOR
JOINT CHAIRMAN
CITY OF ORANGE `
ORANGE CIVIC CENTER . 300 EAST CHAPMAN AVENUE. ORANGE,CALIFORNIA 92666 . POST OFFICE BOX 449
OFFICE OF CITY COUNCIL (714)532-0321
June 18, 1987
TO: Directors, Orange County Sanitation Districts
At the July 8th Joint Board meeting you will select the
Joint Chairman for the next year. As you know, I have
been nominated to serve in that capacity and I would like
this opportunity to present some concerns I will want
to emphasize if I am selected as Joint Chairman for
1987-88.
I am very concerned about creating sewer capacity to meet
the demands of all those areas we serve in Orange County,
the problems of ocean discharge, the 301 H Waiver, and
Sludge Research. Long-term sludge disposal is a project
which must be resolved and carried out to the satisfaction
of all . I want to see us focus on the County's future and
the District's ability to maintain the quality of service for
which we have become known.
I am prepared to serve you as Joint Chairman, and I ask your
vote. I will pledge to address basic needs and meet all
the challenges which this office encounters. I would be
proud to receive your vote. I look forward to the coning year
with much enthusiasm and gratitude.
Thank you for your consideration.
DON E. SMITH
VICE JOINT CHAIRMAN
DES:mjj
RESUME
DON E. SMITH
RECORD OF SERVICE FOR
ORANGE COUNTY SANITATION DISTRICTS
Chairmanships
Seated: May 8, 1968
Resigned: February 14, 1974
Reseated: March 10, 1976
Service on Districts 2, 7, 13, and 14.
Chairmanships:
District 2 - Chairman, May 10, 1972 - May 2, 1973
Chairman pro tem, May 11 , 1977 - May 10, 1978
District 7 - Chairman, October 4, 1978 - May 13, 1981
July 13, 1983 - July 24, 1985
Chairman pro tem, May 13, 1981 - July 13, 1983
District 13- Chairman, January 9, 1985 - July 24, 1985
Vice-Joint Chairman - July 10, 1985 - July 9, 1986
Re-Elected - July 9, 1986.
Committees•
Executive Committee - May 10, 1972 - May 2, 1973
October 4, 1978 - May 13, 1981
July 13, 1983
Proposed District 13 Steering Committee - September 14, 1983
Select Committee to Advise the Staff - January 12, 1983
Special Committee to Study Reorganization, Chairman - October 4, 1978
Select Committee for Negotiations for Tax Exchanges for New
Annexations (AB 8) January 14, 1981
Special Committee for Orange County Water District Agreement - 1972
Resume
Don E. Smith
Continued
RECORD OF SERVICE FOR
CITY OF ORANGE CITY COUNCIL
Elected: March 1966
Re-elected 1970, 1974, 1978, 1982, and 1986
Mayor: 1968 - 1972
Mayor pro tem: 1972 - 1976
1986 - Present
Committees:
Chairman, Official City Old Towne Steering Committee
Redevelopment Committee
Orange International Street Fair, Liaison
Ainsworth Historical House Committee
Annexation Policy Committee
Northeast Orange Park Site Committee
Freeway Landscape Committee
Miss Orange Pageant
Senior Citizens Monitoring Committee
Orange Sister Cities Association
Solid Waste Management Committee
Street Name Change Committee
Villa Park/Orange Development Committee
Oran a Count Division,Lea ue of California Cities Activities:
em er, Orange Caunty Arteria Highway Financing Committee 970 - 984)
Former Chairman, League of Cities Selection Committee
PERSONAL
Member: St. John's Lutheran Church
American Legion
Veterans of Foreign Wars
Friends of the Library (Life Member)
Orange Historical Society (Charter Member)
Chapman College Anniversary Club
Served in World War II (Pacific Theater)
Kiwanis
Rotary
Captain Glassell Award
Orange Man of the Year - 1961
Served as Governor of Orange County Colony - Mayflower Descendants.
RE : AGENDA ITEM NO. 13 COUNTY SANITATION DISTRICTS
w ORANGE COUNTY. CALIFORNIA
immm a avenue
June 24, 1987 cnmoxein
N WMNvnueY.GUM Wne-e127
._ nuieeexn
REPORT OF THE EXECUTIVE COMMITTEE
Meeting Date: June 24, 1987 - 5:30 p.m.
EXECUTIVE COMMITTEE: OTHERS PRESENT:
Present: Director James Neal
Director Carrey Nelson
Don R. Griffin, Joint Chairman Thomas L. Woodruff, General Counsel
Don Smith, Vice Joint Chairman
Ronald B. Hoesterey
Buck Catlin STAFF PRESENT:
Richard Polis
Evelyn Hart J. Wayne Sylvester, General Manager
James Wahner Blake Anderson, Director of Operations
Richard B. Edgar William Butler, Director of Finance
Jack Kelly William Clarke, Superintendent
John H. Sutton Mike Deblieux, Personnel Administrator
Sally Anne Miller Gary Streed, Chief Admin. Assistant
Supervisor Don Roth
Supervisor Roger Stanton
Absent: None
1) Pending South Coast Air Quality Management District (SCAQMD) Matters
A. Compliance with Rule 1110.0 re Nitrogen Oxide (NOx)
Staff reviewed the long-term compliance strategy previously approved
by the Boards which provides for the installation of central power
generating systems which will phase out the Districts' large internal
combustion engines, to be replaced by electric motors powered by
electricity produced by the central power generating equipment.
Installation of the central power generating systems requires the
purchase of off-site air emission credits which was authorized by the
Joint Boards at the regular May meeting. The staff and General Counsel
advised the members of the Committee that an agreement has been
negotiated for purchase of the required NOx credits for a price of
$2,250,000 as previously approved by the Boards. SCAQMD has yet,
however, to establish the actual amount of credits that the seller
will be allowed to transfer.
-1-
r
Executive Committee Report ,
June 24, 1987
Staff also updated the Committee on negotiations for purchase of the
required non-methane hydrocarbon air emission credits presently
underway, as also authorized by the Boards in May.
B. Proposed Rules 223 and 1401
At last month's meeting staff briefed the Committee on SCAQMD's recently
proposed new Rules 223 and 1401 that will require an assessment of the
risks of exposure to certain listed carcinogenic compounds.
Staff provided an update on the measures called for in the proposed
rules which could substantially impact the quality of the Districts'
influent wastewaters emanating from industrial dischargers converting
airborne contaminants to wastewaterborne contaminants. The proposed
rules could also severely impact the Districts' ability to operate
the sewage treatment facilities by imposing requirements for compounds
arising from digester gas flares, aeration systems, energy recovery
projects, and other sewage treatment unit processes that involve air
emissions, as well as on other related activities that would be
regulated and could thus affect the Districts' operations such as
landfill operations and industrial dischargers to our system. These
new requirements could ultimately inhibit the ability of the Districts
and other POTW's to meet the requirements of NPDES permits issued by the
EPA and the State of California.
Analyses of proposed Rules 223 and 1401, scheduled for hearing and
adoption by the SCAQMD Board on July 10, 1987, indicate that they have
been formulated without adequate technical and scientific data, and
that if adopted in their present form would merely transfer airborne
contaminants to wastewaterborne or landborne contaminants. Staff will
be testifying at the July loth hearing.
Because of the far-reaching and potentially significant economic,
social , and crass-media (air, land and water) environmental impacts of
Rules 223 and 1401 the Executive Committee directed the staff to revise
its briefing paper into an issue paper to be forwarded by the Joint
Chairman to SCAQMD Board officials, requesting that consideration of
proposed Rules 223 and 1401 be delayed pending completion of necessary
studies to assess their environmental , health and economic effects and,
further, that a request be made of city and county officials urging that
they make a similar request of the SCAQMD.
The Executive Committee recommends that the enclosed "Issue Paper and
Recommendations Re: Impact on Publicly-Owned Sewage Treatment Works of
Proposed South Coast Air Quality Management District Rule 223: Air
Quality Impact Analysis and Rule 1401: New Source Review of Known and
Suspected Carcinogenic Air Contaminants and Recommended Actions", be
approved by the Boards.
-2-
Executive Committee Report
June 24, 1987
2) Stringfellow Update
Staff advised the Committee that the State Department of Health Services
(DOHS) and the U.S. Environmental Protection Agency (EPA) had recently issued
the "Stringfellow Hazardous Waste Site Remedial Investigation Draft Report."
The draft report is one component of the Stringfellow Remedial Investigation/
Feasibility Study (RI/FS) being conducted by DDHS and EPA to characterize
pollution problems posed by the site, which currently discharges pretreated
wastewater into the Districts' sewerage system pursuant to an interim permit
authorized by the Boards.
The Remedial Investigation does not recommend clean-up alternatives.
Rather, its data base analysis will be used in the Feasibility Study to develop
the clean-up alternatives.
Staff reported that they are reviewing the 100 page executive summary of the
draft Remedial Investigation and upon completion will send out an overview to
all Districts' Directors.
3) Closed Session to Consider Personnel Matters
The Joint Chairman convened the Executive Committee in closed session for a
discussion of personnel matters. Enclosed is a separate confidential report and
recommendation from the Committee.
If any Director wishes to further discuss the report or recommendation, the
Joint Chairman will adjourn to closed session at the July 8th Board meeting.
4) 1987-88 Individual District Budget Recommendations
The Committee reviewed the staff's preliminary 1987-88 budgets for the
individual Districts which incorporate each District's share of the Joint
Works Budgets approved by the Boards on June loth. The budgets total
$403.8 million, a decrease of 8.2 % from the 1986-87 budget. Approximately 10%
of the budget is for operations and 3% for debt retirement. The balance (87%)
is for construction of master planned sewerage facilities for both the Joint
Works and the individual Districts, and authorized reserves.
For the coming fiscal year adequate funding is available for all Districts.
Districts Nos. 1, 5 and 6 have previously adopted user fee programs to provide
necessary supplemental financing of Districts' activities as the costs of
advanced treatment required by federal and state agencies have exceeded the
ability of the ad valorem tax revenues to fund operations under Proposition 13
constraints. District No. 13 receives no appropriation from ad valorem taxes
and is totally financed by fees. District No. 14 is financed by the Irvine
Ranch Water District. -
As the rising costs of higher levels of treatment exceed the ability of the
remaining individual Districts ad valorem tax appropriations to fund the
operating costs, these Districts will also need to consider implementation of a
3-
Executive Commmittee Report
June 24, 1987
supplemental user fee program to provide the necessary revenues for financing
their operations. Staff has already met with the Boards of Districts 3 and 11
to review their long-range financial plans as they are the next Districts that
will have to revise their revenue plans, and will soon be meeting with District
No. 2 to begin the process. District No. 7 appears to have adequate ad valorem
tax revenues for the next several years and, thus, will not have to consider
supplemental user fees for some time.
Following is a tentative timetable for implementation of supplemental user
fee programs for those Districts which have not already adopted such fees but
will need to consider them in the future:
District Tentative Implementation Date
District No. 11 July 1, 1988
District No. 3 July 1, 1989
District No. 2 July 1, 1990
District No. 7 July 1, 1991
Those Districts with supplemental user fee programs now in place have also
adopted increased connection fees schedules for capital financing requirements
as part of their updated long-range financial plans. Staff is reviewing the
capital requirements for all Districts and recommendations for increases in
connection fees, where appropriate, are forthcoming.
The Committee recommends adoption of the proposed budgets for 1987-88. A
detailed transmittal is contained in the enclosed bound report. If any Director
needs additional information, please call Wayne Sylvester or Bill Butler at
(714) 962-2411.
-4-
v COUNTY SANITATION DISTRICTS
M ORANGE COUNTY, CALIFORNIA
10 EWS AVENUE
June 25, 1987 nasmeln
REF /A434 N MN VA V.o Mw 92l 147
ISSUE PAPER O1O1B6Q'°"
and
RECOMMENDED ACTIONS
Re
Impact on Publicly-Owned Sewage Treatment Works of Proposed
South Coast Air Quality Management District
RULE 223: AIR QUALITY IMPACT ANALYSIS
and
RULE 1401: NEW SOURCE REVIEW OF KNOWN AND SUSPECTED
CARCINOGENIC AIR CONTAMINANTS
PURPOSE
The purpose of this issue paper is to evaluate the potentially significant
effects of proposed South Coast Air Quality Management District (SCAQMD) Rules
223 and 1401, and to propose that the Board of the SCAQMD delay consideration
and implementation of the rules (now scheduled for hearing on July 10, 1987)
pending the completion of necessary health, environmental and economic studies.
This paper also sets forth recommended actions for conducting the necessary
studies to provide the information required to adequately assess and weigh the
potentially significiant environmental, health, economic and social implications
of the proposed rules to assure development and implementation of appropriate,
scientifically-based air quality standards and procedures.
Because of the significant impact on the Sanitation Districts, this paper
focuses on publicly owned treatment works (POTW1s). However, the evaluation is
also applicable to other public and quasi-public agencies, and the private
sector industrial and business community.
SUMMARY
Recently, the Executive Officer of SCAQMD determined that SCAQMD should control
known or suspected carcinogenic air contaminants to a level that would prevent
maximum theoretical cancer risks to less than one-in-a-million people
(1:1,000,000) and directed SCAQMD staff to develop specific toxic regulations.
Accordingly, proposed Rules 223 and 1401 have been drafted and are now scheduled
for consideration and adoption on July 10, 1987 by the SCAQMD Board.
- 1 -
The County Sanitation Districts of Orange'County are responsible for protecting
human health and the environment through the construction and operation of
wastewater conveyance and treatment facilities which serve 2,000,000 citizens in
the metropolitan portion of Orange County. The Sanitation Districts have
several new projects planned for construction that are necessary to meet the
public health and environmental needs of Orange County that may be affected by
the proposed rules. These include, but are not limited to, central power
generation facilities for energy conservation and efficiency, odor control
facilities, additional treatment capacity, advanced treatment facilities and
sludge handling facilities. In addition, these proposed rules will probably
affect other related activities including landfill operations. Further, the
proposed rules may cause industrial firms to convert airborne contaminants to
wastewaterborne contaminants and significantly restrict the ability of
industrial firms to expand or modify their existing operations which could have
a significant effect on the entire Southern California economy.
Based on available data it appears as if SCAQMD will be considering adoption of
these new rules without benefit of adequate information. Because of the
far-reaching implications of proposed Rules 223 and 1401, before SCAQMD
considers adopting the new rules, the SCAQMD Board should conduct the necessary
studies to provide the information required to adequately assess and weigh their
environmental , health, social and economic impacts. Such a thorough evaluation
would then allow development and implementation of scientfically-based air
quality standards and procedures deemed proper and reasonable.
DISCUSSION
Impacts of Rules 223 and 1401
Proposed Rules 223 and 1401 specify over thirty compounds that are known or
suspected to be human carcinogenic air contaminants and establish theoretical
risk factors for each of these compounds.
The rules would require that all applicants for construction of new or upgraded
public or private facilities contain an analysis of the air stream for these
compounds and that a risk analysis be performed. As background for this
discussion it should be noted that there is considerable and ongoing debate
relative to the state-of-the-art of risk analysis and assessment.
All of the theoretical risk factors calculated for over thirty compounds would
be added together. If the combined cumulative theoretical risk factor totaled
1:1,000,000 or more, then best available control technology for toxicants
(T-BACT) would have to be constructed. If, after the application of T-BACT the
combined cumulative theoretical risk factor is still predicted to be greater
than 1:1,000,000, then additional risk analyses must be performed. If certain
other source strength and cancer incident criteria are not met, then the Permit
to Construct would be denied by SCAQMD. If the combined theoretical risk factor
remains greater than 1:100,000 after the application of T-BACT, then the permit
would be denied outright by SCAQMD.
_ 2 _
A preliminary analysis of the proposed rules has concluded that if adopted in
the present form, they will significantly affect POTW's by:
o Restricting the ability to obtain future SCAQMD Permits to Construct
and Permits to Operate existing and new facilities for wastewater
treatment, odor control and energy generation
o Restricting the ability to dispose of sewage sludge in landfills
o Modifying existing industrial wastewater control programs and the
limits set on industrial dischargers, thus limiting expansion of the
industrial base or, possibly reducing it, with adverse impacts on the
entire Southern California economy.
The full extent of these impacts is uncertain at this time because of the
limited air emission data that is available in the South Coast Air Basin
(defined as Los Angeles, Orange, San Bernardino, and Riverside Counties). Very
little emission data has been developed in this air basin. With minor
exceptions there is virtually no data on trace air contaminants that are
carcinogens or suspected carcinogens. This places all permittees as well as the
SCAQMD in the position of not being able to reliably predict the effects of the
proposed rules on new projects in the entire air basin.
The rules in their present form may significantly restrict public agencies such
as the Sanitation Districts from constructing new facilities. For example,
hexavalent chromium in digester gas may be at levels that would preclude the
SCAQMD from issuing permits for any project that involves utilization of
digester gas in waste-to-energy cogeneration projects. This would be
counter-productive as it could prevent construction of facilities planned to
meet other existing SCAQMD regulations such as the limitations on oxides of
nitrogen and would also prevent sewage treatment plants from recovering the
valuable energy resource that digester gas represents that is created as a
natural by-product of anerobic sludge digestion.
The same is true of some public agency facilities and the majority of private
sector industrial operations. Thus, the Sanitation Districts are joined by
other organizations in expressing concern regarding the uncertainty of the
impacts of these new regulations, including landfill owners and operators and
industrial firms.
Public landfill operators face the uncertainty of whether the new emission
requirements will also block energy recovery projects for naturally-occurring
landfill gas. This may cause landfill operators to restrict the materials that
they will accept for disposal.
Industrial firms also face the prospect of being severely restricted from
upgrading or expanding their existing facilities. It is possible that these
proposed rules could significantly limit any future expansion of the industrial
base in the Los Angeles, Orange, San Bernardino, and Riverside County areas,
thus dealing a severe blow to the economic well-being of Southern California.
- 3 -
The SCAQMD rules would have a direct effect on industries through issuance of
Permits to Construct and Permits to Operate. The proposed SCAQMD rules would
also have an indirect effect on industries because of the restrictions that
POTW's would have to impose on industrial dischargers so that POTW's could, in
turn, meet the restrictions placed on their operations by the SCAQMD.
Clearly, these potentially significant impacts dictate a cautious approach in
developing and implementing new rules.
The Approach Used in Developing Rules 223 and 1401
The theoretical risk factors cited for the over thirty compounds listed by the
SCAQMD are based largely on animal laboratory experiments where cancer was
induced in non-primates in a short length of time at extremely high dosages.
These results were then extrapolated to supposedly represent the human risk
factor of a low level of exposure over a seventy-year life span. This approach
is very controversial and has divided the scientific community regarding its
appropriateness.
These theoretical risk factors are also based on the assumption that exposure
will be continuous for seventy years at the maximum concentration of the
cumulative elements (all added together) measured for the particular source.
This would mean that - in the case of an exposure from a particular source - the
individual would have to remain downwind of the source continuously for seventy
years. Changing wind patterns, atmospheric conditions, place of residence and
day-to-day movement all cause this level of exposure to be improbable.
A theoretical risk factor of 1:1,000,000 cited in the rules is difficult to
comprehend without the benefit of comparison. Tables 1 and 2 (provided in an
SCAQMD briefing package made available to the public in April) indicate the
relative risk levels of normal daily activities including such things as
smoking, eating peanut butter, driving an automobile, and flying in an airplane.
These tables clearly show that for nearly all daily activities a theoretical
risk factor of 1:1,000,000 is common and encountered in every-day living.
General cancer risk itself is significant over an average seventy-year life
time, which is the span of time generally used in risk analysis. It is worth
noting that the baseline of all known cancer risks is at least 250,000:1,000,000
by virtue of the fact that approximately twenty-five percent of the general
public contracts cancer at some time in their life. Therefore, an additive risk
of one more in a million must be carefully weighed.
Balancing Environmental and Economic Impacts
Of particular concern when considering the proposed new SCAQMD Rules 223 and
1401 is that many of the existing airborne contaminants, if regulated by SCAQMD,
will merely be transferred to another medium (from air to water or land) rather
than being destroyed. That is to say, materials that are presently within
airstreams will be converted to either wastewaterborne contaminants, or
concentrated and disposed of in a landfill . At this point, the SCAQMD has not
provided an assessment of the long-term environmental impacts of moving these
materials from one environmental medium to another. Thus an environmental
impact report should be done on the proposed rules.
- 4 -
Although the proposed rules require the use of best available control technology
. for toxics (T-BACT) for the listed compounds if a predicted uncontrolled risk of
1:1,000,000 is encountered, SCAQMD has not determined if control methods are
even available for each of these listed compounds. Therefore, needed new
facilities may be impossible to construct because the SCAQMD standard is
impossible to achieve.
SCAQMD has also stated that cost will not be a consideration in determining the
applicability of a particular technology for controlling an air contaminant
identified as being a known or suspected carcinogen. In other words, cost is no
object. This appears to be an impractical approach with potentially dire
economic consequences from the standpoint of not only private firms but, most
particularly, public agencies. The implementation of any project must include
the test of economic viability.
In the future, the incorporation of new compounds or more restrictive risk
factors could significantly affect not only the ability of a project to be
permitted, but the ability to commence operation once constructed. Potentially,
a Permit to Construct could be issued by the SCAQMD and then months or years
later, when the project is completed, another review of the carcinogenic or
suspected carcinogenic compounds could be made prior to the issuance of a Permit
to Operate. If the list had been revised in the interim, then a project that
had originally been identified as suitable for construction and built with a
major investment of public funds, could be subsequently disallowed for
operation. Typically these types of projects cost in the tens of millions of
dollars, or more, in the case of the Sanitation Districts.
CONCLUSIONS
Enactment of proposed Rules 223 and 1401 and the listed compounds (numbering
over 30) appears to be premature at this time. Because of the far-reaching
implications of the proposed rules, before SCAQMD considers their adoption, the
SCAQMD Board should conduct the necessary scientific, environmental, health and
economic studies typically contained within an EIR to provide the information
required to adequately assess and weigh the respective impacts so that proper
and reasonable procedures and standards can be supported and established.
The County Sanitation Districts are strong supporters of scientifically-based
environmental protection measures for our water, land and air resources.
However, this goal must be pursued in a pragmatic and cross-media balanced
manner to assure that optimum overall environmental/health management occurs and
that cost-effective approaches are considered and developed.
In the pursuit of minimizing human health risks in the South Coast Air Basin, it
is imperative that this goal be carefully weighed with other equally important
goals. Otherwise, it is quite possible that POTW's would be constrained under
these proposed rules from meeting existing and future water quality protection
rules promulgated by the U. S. Environmental Protection Agency and the
California Regional Water Quality Control Boards.
yd
- 5 -
RECOMMENDATIONS
.►
It is recommended that the SCAQMD delay consideration of proposed Rules 223 and
1401, and proceed in the following manner prior to enacting the rules as they
are presently formulated:
1. That SCAQMD publish the human health effects data and laboratory animal
experimental data used for establishing the theoretical risk factors for
each listed compound. Workshops should be conducted, written comments
solicited and the basis for each risk factor should receive peer review by
the scientific community.
2. That SCAQMD complete a baseline study that assesses the existing trace
contaminant level presently in the South Coast Air Basin and determine the
theoretical human health effects that these compounds realistically
represent. The results of the study should receive peer review by the
scientific community to assure that all conclusions are
scientifically-based.
3. That, if it is demonstrated that significant theoretical human health risks
do exist in the South Coast Air Basin, then SCAQMD should determine the
major sources of contaminants and the feasibility of implementing control
technology.
4. That, having identified the sources and the control technologies, the
SCAQMD should conduct an overall assessment of the projected environmental ,
health, economic and social impacts of the application of these rules and
control technologies in the attainment of air emission reductions. A
cross-media assessment of the overall impact of these air emission
reductions should be conducted to be assured that the optimum
environmental/health protection conditions are achieved, all factors
considered.
Further Information
Any questions of the Districts' staff or requests for further information on
this matter should be directed to Blake Anderson, the Districts' Director of
Operations, at (714) 962-2411.
Attachments: Table 1
Table 2
- 6 -
Excerpt from South Coast Air Quality Management District
"Regulating Carcinogenic Air Pollutants: Current and
Potential Future Approaches" dated April 1987
TABLE 1
RISKS WHICH INCREASES C�iANCE OF
DEATH BY 1 x 10" '
Smoking 1.4 cigarettes Cancer, heart disease
Spending 3 hours in a coal mine Accident
Traveling 10 miles by bicycle Accident
Traveling 300 miles by car Accident
Flying 1000 miles by Jet Accident
Flying 6000 miles by Cancer caused by cosmic
by jet radiation
Living two months Cancer caused by
in Denver on vacation cosmic radiation
from New York
Living two months in an average Cancer cased by
stone or brick building natural radioactivity
One chest x-ray taken in a Cancer caused by radiation
good hospital
Eating 40 tablespoons Liver cancer caused
of peanut butter by afl atoxin 8
Drinking Miami drinking Cancer caused by
water for I year chloroform
Drinking 30 12 oz. Cancer caused by
cans of diet soda saccharin
Living 5 years at site Cancer caused by
boundary of a typical radiation
nuclear power plant
in the open
Living 15 years Cancer caused by
within 20 miles of ratiation
a nuclear power plant
Risk of accident by Cancer caused by
living within 5 miles radiation
of a nuclear reactor
for 50 years
*From Wilson (1979)
Excerpt from South Coast Air Quality Management District
"Regulating Carcinogenic Air Pollutants: Current and
Potential Future Approaches" dated April 1987
TABLE 2
PUTTING RISK IN PERSPECTIVE
X=01 Of AT. 0=1.110N unnTte KClosNu (Nvua"w Nut
[ass
srllNlY•N
1 IN I(O
1Pt
yl0[IN6
Iti oNf r MI
•.CI CJII 01IIV(I1 IIOCF CtNIIINO
1 IN IdA
10't
011rvIN0 YOT011
vin6U
f 41Yt11 Ill NOtl!
KCIOfNTS
f I110u1cT
lrtlrr mintNG .0 r..Nu
1IN IO.WO
T 11UC[ONIV IN6 11[1111fi
(N01N/l11 MOYt rI[{ DO[IT1.YQf
0
{ISING M 1w All
mnr..ttrtm nu uaavNo
11N 1pp tW
[•a.T,ol.
lal
a-
ol• r13N,M4
e AV
OCC.IIONM
.14 T11•v!t
1 IN I.IW M len M1Tl r N�'
l0'1
(•TINO
CN•11CVIA.
0rt[
0
IINlO=ZC
•NIY1t llil
0[INStR STING
SOURCE: ADAPTED FROM EPRI ( 1985) .
RE; AGENDA ITEM NO. 17 COUNTY SANITATION DISTRICTS
of ORANGE COUNTY, CALIFORNIA
June 18, 1987 1 ONLA ELLI9 AVENUE
PO.BOA 8127
FOUNTAIN VOLLEY.CALIFORNIA 92728.8127
MIA)8B22O11
INTERIM REPORT OF THE 914)W.2910
BUILDING COMMITTEE
The Building Committee met on June 18th. Following are interim status
reports and/or recommendations on items that have been under consideration by
the Committee.
1. New Administrative Office Addition
A. Grading and Paving
The contract with Pulaski and Arita provided that they would recommend a
designer to do grading, drainage, surveying and administration building
parking lot design, and that the Sanitation Districts would issue a
separate purchase order for this work.
Boyle Engineering Corporation is presently performing other related work
for the Districts, including the project for Entrances , Site, Security
and Interior Roads, Plant No. 1, Job No. P1-27. It is expected that
portions of the administration building access and parking will be
included in the interior roads contract to facilitate coordination
between the several projects in the immediate area.
A separate purchase order has been issued to Boyle Engineering
Corporation for the grading and paving design work.
B. HVAC System
The Committee has reviewed changing the heating and air conditioning
system to a heat exchange unit utilizing waste heat from the Districts'
proposed Central Power Generation Systems, Job No. J-19. Utilization of
this waste heat allows the project to be classified as a Federal Energy
Regulatory Commission (FERC) project which makes the Districts eligible
for reduced natural gas prices for the treatment plant .operation. (The
natural gas will supplement the Districts' digester gas and allow the
Districts to generate more low cost electricity than the digester gas
alone could provide.)
The recommended HVAC system is more complex and includes design of a
separate structure to house the equipment. The Selection Committee
is currently negotiating with Pulaski and Arita for the additional
design required for this system and their recommendation will be
submitted to the Boards for consideration as a separate agenda item.
-
C. Board Room Audio/Visual System
.� The architects and the Committee reviewed several alternatives and price
levels for Board Room audio/visual equipment. The Committee has
selected a cost-effective, versatile system which will provide the
necessary audio/visual capabilities for technical and public information
presentations and also allow Directors and speakers to be heard in the
. o
Building Committee Report June 18, 1987
Page Two
new enlarged Board Room. The cost is between the lowest and mid-level
alternatives. The audio/visual system will be included in the building
contract.
D. Office Interior System
The Directors will recall that the Committee previously recommended an
office interior system utilizing a system of freestanding and/or movable
partitions of varying heights in the new offices as well as in the
existing building. The Ethospace office interior space planning system
manufactured by Herman Miller was selected after a subcommittee's review
and evaluation of alternative systems, including questionnaires ,
manufacturers' presentations and visits to working installations.
After analyzing cost, efficient use of space, productivity and other
related factors, the Committee also elected to utilize new modular
component office furniture for existing, new and future offices and
conference rooms, and has directed Pulaski and Arita to proceed
accordingly. Herman Miller's Ethospace system includes the modular
office furniture and fixtures that maximize the effective use of the
office space. The furniture and interior partition system and
installation will be included in a separate contract.
Pulaski and Arita, architects for the Administration Building Addition, have
submitted plans and specifications for the project to the City of Fountain
Valley and have complied with all comments received from that city. Upon
completion of the HVAC revisions the plans and specifications will be
presented to the Boards for consideration.
2. Central Laboratory, Job No. J-17
In August of 1986, the Directors awarded a contract to Boyle Engineering
Corporation to design a new central laboratory. The scope of work
envisioned a building with a footprint of approximately 20,000 square feet
and utilization of the area beneath a raised floor for several purposes,
including housing of industrial waste activities, storage, and mechanical
equipment (40,000 square foot total ) . -
Boyle has spent a great deal of time interviewing Districts' .staff to
determine laboratory needs and has completed a program and schematic design
which includes basic design recommendations , costs and locations of the
various laboratory and industrial waste facilities.
The Directors will recall that the building is to be located adjacent to
Ward Street just south of the Orange County Water District's (OCWD) facility
in an area now utilized by a private storage company, under long term lease
from the Districts. Our staff has had preliminary discussions with OCWD and
the Municipal Water District of Orange County (MWDOC), both of which plan to
construct additional offices on the OCWD site. Both agencies are interested
in utilization of Districts' roads for access since OCWD's entrance off '✓
Ellis Avenue is impacted by heavy traffic in the same manner as the
Sanitation Districts' . MWDOC, OCWD and the Sanitation Districts may be able
to jointly contract and share certain road facilities off Ward Street for
each agency's mutual benefit.
Building Committee Report June 18, 1987
Page Three
The Committee reviewed Boyle's conceptual design, and directed the architect
..� to continue with design and preparation of contract documents for a two-story
central laboratory building of approximately 40,000 square feet total , with
an entrance off Ward Street.
3. Warehouse and Maintenance Building and Oil Storage and Dispensing Improvements
In February 1986, the Directors approved the Master Plan of Support Facilities
for Plant No. 1. This plan recommended that all support facilities, such as
the central laboratory, warehouse, shops and offices be built around the
perimeter of the site thereby providing screening for the interior of the
plant which would be reserved for wastewater treatment facilities. The plan
also addressed'site entrances and interior traffic circulation.
Planned in the near future is the design and construction of additional
primary treatment facilities at the Plant No. 1 site. The Districts' master
plan for wastewater treatment facilities indicates that the new digesters
should be built on the easterly boundary of the plant, adjacent to the
Santa Ana River. The location is now being utilized for storage of low
turnover inventory items, including a "boneyard", and certain mechanical
maintenance shops and offices.
Consistent with the concept outlined in the Master Plan of Support Facilities,
staff is proposing that these facilities should be moved to the warehousing
and shop complex located in the northwest corner of the plant. In addition,
the staff has recommended the construction of an oil dispensing dock which
would store oil within a locked, secure area at a raised elevation which would
also facilitate safer handling of the 55-gallon drums. The improvements are
generally depicted on the attached plot plan.
Recommendation: The Committee recommends approval of Amendment No. 1 to the
Master Plan of Support Facilities for Plant No. 1, to incorporate Warehouse
and Maintenance Buildings and Oil Storage and Dispensing Improvements as shown
on the attached; and authorization for the Selection Committee to solicit
proposals and to negotiate a professional consulting services agreement for
the necessary design work.
Respectfully submitted,
BUILDING COMMITTEE
Norman E. Culver, Chairman
Todd Murphy
James Neal
Carrey Nelson
Bob Perry
Sal Sapien
Charles Sylvia
... Jim Wahner
Attachment
VEHICLE AND
CONVERTED OIL DOCK r EMERGENCY EQUIPMEN-
AND STORAGE AREA I STORAGE AREA
ELLIS AVENUE I
1`
PURCHASING VEHICLE LOHPOU'
l�' ^]� BLDG.
j
FUTL URE WAREHOUSE
STORAGE VEHICLE
MAINTENANCE
SHOP
FUTURE MECH.
STORAGE SHOP ELECT. - 3
INSTR. Il
SHOP \ � <
�\\ o
W/M BLDG. m
STORAGE AREA
LW/MM'STIORAGE BLDG. V
FUTURE ROADWAY
I �
I
I I
e FUTURE PRIMARY BASIN I
AND PARKING FACILITY
0 e
i
a
' I
~ . I
I
I
I AMENDMENT N0. 1
To The
Master Plan of Support Facilities
EGEND For
Plant No. 1
PHASE I
® PHASE II
COUNTY SANITATION DISTRICTS
0 ORANGE COUNTY. CAUFORNIA
RE: AGENDA ITEM NO. 18 1W44 EWS AVENUE
PO eo%9127
MUNTUN VALLEY,UUFGRMA 927 127
June 29, 1987 014)M22.11
REPORT OF THE FISCAL POLICY COMMITTEE
WORKERS' COMPENSATION INSURANCE POLICY RENEWAL
At the regular meeting on June 10, 1987, the Joint Boards of Directors
authorized and directed the Fiscal Policy Committee to evaluate proposals
obtained by the Districts ' insurance broker and to place Excess Workers'
Compensation insurance effective July 1, 1987. The Committee evaluated various
proposals, selected coverage and directed the staff to place the coverage with
our broker. The purposes of this report are to:
- provide the Directors with background data regarding the Districts '
existing workers ' compensation coverage and coverage available for
1987-88
- present the Committee's recommendation for coverage for 1987-88 to the
Joint Boards for review and ratification/revision at the July 8, 1987
regular meeting.
Existing/Available Coverage
The Districts ' 1986-87 coverage and premium levels are presented below:
Amount of Self-Insured 1987-88
Coverage Retention (SIR) Premium
Statutory $150,000 $30,634
(unlimited
coverage)
The following 1987-88 coverage and premium options were considered by the Fiscal
Policy Committee:
Option Amount of Self-Insured 1987-88
Number Coverage Retention (SIR) Premium
1. $5 million $150,000 $27,840
2. $5 million $200,000 $21,690
3. Statutory $150,000 $36,900
(unlimited
coverage)
4. Statutory $200,000 $29,500
(unlimited
coverage)
Page Two
June 29, 1987
1987-88 Workers ' Compensation Fund Budget
Over the past five years, the Districts' total workers ' compensation claims
expenses have ranged between $65,000 and $115,000 per year. Our safety program
has assisted in maintaining a low level of claims for an organization of our
size, complexity and scope of operations.
Attached is the approved 1987-88 Workers' Compensation Self-Insured Fund budget,
which includes the following line items relative to placement of this coverage:
Line Item 1987-88 Approved Budget Amount
Excess Loss Policy $40,000
Estimated Claims $125,000
Fund Reserves $666,000
The premiums associated with all four coverage options are under the $40,000
approved budget amount.
Recommendation
Since the purpose for placement of excess coverage is to provide outside
financial assistance in the event of a catastrophic claim or series of claims,
the Fiscal Policy Committee recommends that the Boards ratify the Committee's
selection of Option 4, which includes a self-insured retention level of $200,000
for an annual premium of $29,500.
Any claims in excess of the $125,000 in estimated claims already included in the
1987-88 budget can be paid from the $666,000 in budgeted fund reserves. Total
claims in excess of $200,000 will be covered by the excess policy.
Respectfully submitted,
Ron Hoesterey, Chairman
Don Griffin
Philip Maurer
James Neal
John Sutton
Peer Swan
James Wahner
Attachment
JOINT WORKS OPERATING BUDGET
WORKERS' COMPENSATION SELF-INSURED FUND SCHEDULE VI
1987-BB FISCAL YEAR 4/24/87
1986-87 1987-88
1986-87 ESTIMATED RECOMMENDED
EXPENDITURES BUDGET EXPENDITURES BUDGET
------------------------------------------------------------
1. Salaries, Wages and Benefits 15,000 5,596 15,000
2. Benefits/Claims 125,000 110,000 125,000
3. Contractual Services 10,000 12,608 12,000
4. Legal Services 5,000 0 5,000
S. Professional Services 17,000 12,615 15,000
6. Supplies 6 Other 1,000 0 1,000
7. Sub-Total 173,000 140,819 173,000
A. Excess Loss Policy 14,000 30,634 40,000
9. Total Expenditures 187,000 171,453 213,000
REVENUES 6 RESERVES
10. In-Lieu Premiums 120,000 120,000 186,000
11. Interest 6 Miscellaneous 67,000 50,183 65,000
12, Total Revenues 187,000 170,183 251,000
12. Excess Revenue (Expenditures) 0 (1,270) 38,000
13. Reserves and Transfers 666,000 629,375 628,000
14. Ending Reserves 666,000 628,105 666,000
RESOLUTIONS AND SUPPORTING DOCUMENTS
WEDNESDAY, JULY 8, 1987 - 7 :30 P.M.
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 6105/87 PAGE 1
}� REPORT MURDER AP43
_ COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
III• CLAIMS PA15 36/10/87
WARRANT NO. VENDOR AMOUNT DESCRIPTION
I+'
086489 ACTION INSTRUMENTS, INC. 51.367.10 SMALL TOOLS .¢
086/90 AOVANCO CONSTRUCTORS. INC. SL.379,163.97 CONSTRUCTION J-15-1
PR6491 AEROCOMP, INC. - - $2.146.44 HYDROGEN SULFIDE STUDY
986492 AIR. COLD SUPPLY INC. 576.36 ELECTRONIC PARTS
SB6493 AIR PRODUCTS L CHEMICAL INC. S3.807.66 OXYGEN PARTS -
086-94 ALLIED CORPORATION $9.361.14 CATIONIC POLYMER
C86495 ALLIED SUPPLY CO. $174.00 PLUMBING PARTS
P„{,7 085196 ALLIS-CMALXERS CORP. $553.76 PUMP PARTS
086497 OLL PURE CHEMICAL - - - - -- - ---- $37.554.08 CHLORINE
0B5A98 FENOASTNIP, INC AND/OR ALBAN $170.66 OFFICE SUPPLIES
086499 AMERICAN SCIENTIFIC PRODUCTS $1.340.78 LAB SUPPLIES
066509 ANAHEIM SAY SOW INC. $146.50 TOOL REPAIR
�--. 986501 THE ANCHOR PACKING CO. 58,224.42 PUMP PARTS
�I. "1 C86502 A-PLUS SYSTEMS SIS2.55 PRINTING
-86-93 A9UA BEN CORv. - --- ------- -- - 13.98Bd3 ANIONIC POLYMER
Q 086504 AR ATE. SERVICES. INC. 13 r2A5.02 UNIFORM RENTALS
026505 ARENS INDUSTRIES INC. 519315r01 INSTRUMENT PARTS
10 0065C6 ANSA - - 1430.99 MEETING
I O86507 RALPH V. ATKINSON 1528.7E PUMP PARTS
•'�f; M 086508 ATLANTIC L GULF FISHING SUPPLY 598.65 LAB SUPPLIES � •
O06509 FALCON DISPOSAL SERVICE -- ---- - - 219.929.63 GRIT REMOVAL J
IP[_- OB6510 BACHARACM, INC. $18.05 ELECTRONIC MATERIALS
C86511 BROOKS INSTRUMENT DIV. 5101.23 INSTRUMENT
!„YJ 086512 BROWN L CALDYELL $159.00 LAB SUPPLIES
�..1," 086513 BUCKEYE GAS PRODUCTS $19.02 PROPANE
f� 0SE514 BUSH AND ASSOCIATES, INC. 51.911.00 SURVEYING SERVICES
086515 0ILLIAM M: BUTLER - - 5398.62 PETTY CASH
y-+ ".86516 C L R RECONDITIONING CO. 199.00 MECHANICAL REPAIRS
�' C7 786517 CPT CALIFORNIA. INC. $39.29 OFFICE SUPPLIES
L.N C86518 CS COMPANY 11.609.92 _ ELECTRIC PARTS
�..', 286519 CAL-GLASS FOR RESEARCH, INC. $90.80 LAB SUPPLIES
B06520 JOHN CAROLED ENGINEERS $921.49 ENGINEERING SERVICES-J-19
C86521 C"ERICAL RESEARCH LOBS 1570.99 LAB SERVICES
(ly C.i 086522 CMEPUEST INDUSTRIES. INC. SIO,117.P3 FERRIC CHL0RIDE -
r 086523 COLIC" L SONS. IJV) 52.591.173.94 CONSTRUCTION 2-25
CBE524 CONSOLIDATED ELECTRICAL DIST. 52.390.66 ELECTRONIC SUPPLIES
006525 CONSOLIDATED REFROGRAPHICS S9.450.98 PRINTING ,
C86526 CONTINENTAL CHEMICAL CO $8.132.32 CHLORINE
086527 COSTA MESA AUTO SUPPLY 5351.72 AUTOMOTIVE PARTS
'.1 086528 CAL WATER 3153.75 LEASE
C06529 CUSTER CONSTRUCTION CO. $733.42 ENGINEERING SERVICES-5-19-R3
086530 STATE BOARD OF EQUALIZATION $60.65 HA2ARCOUS SUBSTANCE TAX-
��, 686531 ONE. INC. $928.57 AUTOMOTIVE PARTS
006532 DANIEL BOYLE ENGPrr INC. S5111.90 ENGINEERING SERVICES-3-31
I, 086533 OANIELS TIRE SERVICE $3,237.55 AUTOMOTIVE PARTS
�tF C86534 DECO S924.-I LIGHTING
rr i ;
�PJ FUND NO 9199 JT 0151 WORKING CAPITAL PP OCESSING GATE 6/D5/Bi PAGE 2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
I CLAIMS PAID 06/12/87
WARRANT NO. VENDOR AMOUNT DESCRIPTION
C 1 066535 DIAL ONE MAGNESS / SONS 39,740.87 CONSTRUCTION SERVICES-PW-149
086536 DIESEL LOGISTICS. INC. $539.26 MECHANICAL REPAIRS
' I 08F537 DIFILIFPO ASSOCIATES 11.672.15 OFFICE SUPPLIES
�. 086539 OISCC PRINT COMPANY $2.560.05 OFFICE FURNITURE
C86539 DODGE CENTRAL $10.904.27 AUTOMOBILE
086540 DUNN EDWARDS CORP. 191.16 PAINT
F. ,y e86541 TMA/NORCAL 150.30 LAB ANALYSIS
,a) 086542 EASTMAN• INC. $2.106.42 OFFICE SUPPLIES
fiT I'86543 EL TORITO RESTAURANTS, INC. $351.53 USE CHARGE OVERPAYMENT
086544 FMC CORP. S14.611.38 HYDROGEN PEROXIDE
'- 186545 FARR SALES 1 SERVICE 1222.75 ELECTRONIC PARTS
"TT 086546 FEDERAL EXPRESS CORP. 153.80 SHIPPING
096547 FISCHER / PORTER CO. 12.830.37 CHLORINE EQUIPMENT
F.I1 086546 FLO-SYSTEMS S235.32 PUMP PARTS
ITT
006549 DONALD L. FOR R ASSOCIATES 1825.00 SAFETY ENGINEERING SERVICES
'086550 THE FOXBORO COMPANY $704.62 INSTRUMENT PARTS
4h V86551 FRANCE COMPRESSOR PRODUCT S675.40 MACHINE PARTS
;p OP6952 - CITY OF FULLERTON - 113.75 WATER USEAGE
086553 FULLERTON COMMUNITY HOSPITAL $1.267.67 REFUND OF OVERPAYMENT
096554 GANAML LUMBER CO. $2.002.81 SAND
C86555 GENERAL TELEPHONE C0: $1.210.49 TELEPHONE
OB6556 GIERLICH-MITCHELL• INC. 91,045.04 MECHANICAL PARTS
986557 HALSTED 6 MOGGAN• INC. 9311.96 ELECTRONIC PARTS
` O 086558 HART - LATIMER ASSOC. - $292.72 ELECTRONIC PARTS
E ,v C86559 MATCH A KIRK. INC. $152.64 ENGINE PARTS
906560 S. A. MEALY COI
5139:568.87 CONSTRUCTION PI-23K
.p 096561 HOERBIGER C.Y.S. CALIF. • INC. S1 so,
.'88 MECHANICAL PARTS
OP6562 HOOPER CAMERA STORES 1154.55 FILM
(1� 886563 L1S4 HOOTON 121.84 EMPLOYEE MILEAGE
086564 MOUSE OF BATTERIES $1.233.53 INSTRUMENT REPAIR
�. 086565 HUFFY CORPORATION $94.28 BICYCLE PARTS
,.� 986566 R.S. HUGHES CO.. INC. $513.90 PAINT SUPPLIES
.I 086567 CITY OF HUNTINGTON REACH $16.80 WATER USEAGE
.• C86568 IMPERIAL WEST CHEMICAL S1,899.82 FERROUS CHLORIDE
086569 INDUSTRIAL THREADED PRODUCTS S135.64 HARDWARE/STEEL
UB6510 IN GR AM PAPER 1g39.53 JANITOR ML/OFFICE SUPPLIES
f.. 086571 INTTRN ATIONAL TECHNOLOGY CHNOLOGY 3q•599.00 APPLICATION SOFTWARE SUPPORT
086572 IRVINE RANCH WATER DISTRICT $24.00 WATER USEAGE
„I USE 573 JACK X CHANGE $91.03 VEHICLE REPAIR
C06514 GLENN R. JAMESON $2,200.00 ENGINEERING SERVICES-PI-28,P2-36
P86575 KAMAN BEARINGS 1 SUPPLY $3.241.16 BEARINGS
026576 NEENAN SUPPLY $1.576.87 VALVES
f 086577 KIF.VIT PACIFIC CO. $86.495.13 CONSTRUCTION J-6-2
D86578 KING GEARING. 'INC. $146.87 FITTING
086579 KNCVLEOGE BANK. THE 2372.10 COMPUTER WORKSHOPS
�Y 086560 LEE L PO CONSULTING ENGR• $4.737.00 ENGINEERING SERVICES PI-23R,PI-24R,P2-31R
■
FUND NO 1199 - JT GIST WORKING CAPITAL PROCESSING DATE 6/05/07 PAGE 3
REPORT NUMBER APO3 -
31 COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 96/19187
WARRANT NO. VENDOR AMOUNT DESCRIPTION
086501 LIGHTING DISTRIBUTORS. INC. f923.Afi ELECTRIC PARTS/LIGHTING
086582 LOS ANGELES TIMES $163.17 ADVERTISEMENTS
P86583 ADS NUCLEAR, INC. 3155.00 LAB REPAIRS
016584 MARGATE CONSTRUCTION. INC. f399.579.95 CONSTRUCTION PW-061R-1
086565 MATT - CHLOR. INC. $1,255.80 CHLORINATION PARTS
006596 MCKENNA ENGN. 6 EQUIP. $7.110.79 PUMP PARTS
fo C86587 MOORE L TABER f11.798.06 ENGINEERING SERVICES 2-21
006588 NOTION INDUSTRIES. INC. $925.52 MECHANICAL PARTS
086589 MYERS-TIRE SUPPLY - -- "" - $309.95 AUTOMOTIVE PARTS
086590 NELSON-DUNN. INC. $37.21 ENGINE PARTS
066591 NU-WEST FABRICATION 5793.00 MECHANICAL PARTS
P86592 O.M.S. $970.00 TRASH REMOVAL
086593 ORANGE COAST ELECTRIC SUPPLY $1.229.60 ELECTRIC PARTS -
'� H 086594 ORANGE COAST WINDOW CLEANING $600.00 MAINTENANCE CONTRACT
0865". BATTEN CORP - - -_--- -- -- --'- 5768.84 MECHANICAL PARTS
T 096596 OSCAR-$ LOCH L SAFE fL09.89 KEYS
086597 COUNTY SANITATION DISTRICT 57.076.32 REIMBURSE WORKERS COMP
I l#9 056598 PACIFIC SAFETY EQUIPMENT CO. - - $690.84 SAFETY SUPPLIES
7( OB6599 PACIFIC BELL $187.09 TELEPHONE
•J f, - OB 6f PO PAINT STATION i82.2fi PAINT
:.^ - C86601 - PICKWICK PAPER PRODUCTS - - -- -' -- -' i126.50 JANITORIAL SUPPLIES
� C866O2 PLAN-SAK f126.38 OFFICE SUPPLIES
186603 POLY-TAINER $1.399.OD LAB SUPPLIES
0666 PA POSTMASTER CYPRESS - - - 526.27 USE CH AGE OVERPAYMENT
rj+ 0B 66065 PRTRONIK $250.90 " '��
OB 6606 THE IN PROJECTS SOLUTIONS CO. 53.599.00 INSTRUMENT INSPECTION
066607 PULASK1 9 ARITA ARCHITECTS $982.95 ARCNITECTUAL SERVICES
�.,. 086609 PULSAFEEOER $82.51 PUMP PARTS
('1 086609 RED VALVE CO.. INC. 9473.77 PLUMBING SUPPLIES
'10 OB6610 REMEDY TEMP 3599.00 TEMPORARY SERVICES
;•1 �. I� 086611 REMOTE METER RESETTING SYSTEM $2.009.10 POSTAGE
086612 ROBINSON FERTILIZER CO. $1.858.18 CHEMICALS
•y 286613 SANCOM ENGINEERING . INCA $9,950.00 ENGINEERING SERVICES
I 086619 SEA COAST DESIGNS 5111.30 RECORDER
COASTS SETON NAME PLATE CORP. 9774.45 SAFETY SUPPLIES
086616 SIGMA ENERGY SYSTEMS 613.322.61 CONSTRUCTION-RESIDENTIAL SILENCERS
006617 SOIL AND TESTIN6 ENGINEERS $4.866.36 LAB SERVICES
58661E SOU TMERX CALIF. EDISON CO. S10.612.18 POUTER
086619 SOUTHERN COUNTIES OIL CO. S9.210.62 DIESEL FUEL
086620 STAR TOOL S SUPPLY CO. - 31.392.17 TOOLS .
A86621 STEPAN COMPANY S1.1430.66 USE CHARGE OVERPAYMENT
086622 STERLING OPTICAL $224.90 FREIGHT
e86623 SUNDSTRANO AVIATION OPERATIONS $1.525.16 USE CHARGE OVERPAYMENT
..� 086624 SUPERINTENDENT OF DOCUMENTS 11110.G0 PUBLICATION
.86625 THE SUPPLIERS $1.931.25 MECHANICAL/SAFETY SUPPLIES
f84626 TRAVEL TRAVEL S416.00 TRAVEL SERVICES i
J .
FFUNO NO 9199 JT DIST WORKING CAPITAL PROCESSING DATE 6/05181 PAGE • '
REPORT NUMBER AP43 �r
I, COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
�I CLAIMS PAID U6/IB/ST
Q '1 WARRANT NO. VENDOR AMOUNT DESCRIPTION.I
006627 TWINING LABORATORIES 92,674.50 IAS INSPECTION FI
186628 UVDERGROUND SERVICE ALERT $65.a MEMBERSHIP FEES
086629 UNOCAL $294.62 GASOLINE
986630 UNION SIGN CO. $404.92 SIGNS
IS6631 UNITED PARCEL SERVICE S130.66 FREIGHT .
r e86632 UNIVERSAL PACK $235.63 AUTOMOTIVE PARTS
tl ➢ OB 6633 USER-S PREFERENCE. INC. S96.95 LOCK KI7S
Gi 086654 V.O.C. TESTING 11.750.90 11IGERTER GAS ANALYSIS PLT1 6 PLT2 " •
Tn IS6635 VETREE SERVICE INC. f4F 0.Df GROUNDSKEEPING i
Z 006636 WEST COAST ANALYTICAL SAW. $454.90 LAB SERVICES
a•F�D t0663T WE STERN DIGITAL R2 $51.27 USE CHARGE OVERPAYMENT
{L4. 086638 WESTERN STATE CHEMICAL SUPPLY 38.63•.72 CAUSTIC SODA
C86639 NEROK CORP. S2.956.89 PRINTING
.t Fn 666644 21EB PATH AND ALPER S167r46•.23 CONSTRUCTION PI-28,P2-30,P2-36
3 C66641 RICHARD B. EDGAR -_M-----
f1B0_00_ DIRECTORS COMPENSATION C MILEAGE
I to — TOTAL CLAIMS PAID 06/10/67 95.1IT.071.68 R
e to 'I I s s
�v
¢'I_ C, SUMMARY AMOUNT
- , /l OPER FUND $ 18.44 I'
n 12 OPEN FAD 12,532.97
12 ACO FUND 2,600,823.23
-TA /3 OPER FUND 3,248.31
( GR9 15 OPEN FUND 562.93
LL 14(, 15 AID FUND 508,795.59
°•� 96 OPEN FUND 49.88
GI , 16 AID FUND 13,317.57
!7 OPER FUND 119%.52
Oil OPEN FUND 202.45
013 OPER FUND 18.44
/14 OPER FUND 20.00
I /566 OPER FUND 7,191,44 -
f> 1566 AID FUND 479,297.76
0667 OPER FUND 5,467.36
17614 OPER FUND - 1,368.39
1 6'� JT OPEN FUND 179,211.17
t' CORF 1.254,923.0%
SELF FUNDED WORKERS COMP INSURANCE FUND 7,076.31
JT WORKING CAPITAL 44,949.97 [4
Iw r $5,117,071.60
FUND N 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 6/19/87 PAGE 1
` !- _ REPORT NUMBER AP43
If - COUNTY SANITATION DISTRICTS OF ORANGE COUNTY - ----
• (' " CLAIMS PAID 86/24187
I•I WARRANT NO. VENDOR AMOUNT DESCRIPTION
('I
086656 AGO CORPORATION $567.50 INSTRUMENT PARTS
.I 086657 ASP ANALYSIS f56T.50 CONTRACT SERVICE-VIBRATION ANALYSIS
• 006658 AFRO COLD SUPPLY
f2.052d7 HYDROGEN SULFIDE STUDY
y 086659 AIR COLD SUPRLT INC. .936.35 ELECTRONIC PARTS
066660 ALLIED CORPORATION 211$217.19 CATIONIC POLYMER
4 066660 ALLIED SUPPLY CO. $975.33 MECHANICAL PARTS
066662 ALLI S-CNALHEMI CORP. f973.79 PUMP PARTS
O86663 ALL PURE SCIENTIFIC
367.899.79 CHLORINE
{` fn 086663 AREA CAN SCIENTIFIC PRODUCTS 80.000.00 LAB SUPPLIES
e•Ep 066665 AMVAC CHEMICAC CORP. fS0.000.00 NMHC AIR EMISSION CREDITS
086665 THE ANCHOR PACKING CO. $6.117.77 PUMP PARTS
(' 066667 AQUA BEN CORP. 98.292.43 ANIONIC POLYMER
086668 ARATEX SERVICES. INC. f5$590.00 LA FOAM RENTAL
086668 ASSOCIATED LABORATORIES f328.70 LAB SAMPLE ANALYSIS
(` y OBE669 gALPN Y. ATNINSON $328.70 PUMP PARTS
•fYI C86670 AUDIO VIDEO REPORTING SERVICE $113.30 AUDIO SERVICES
• 48F671 BC INDUSTRIAL SUPPLY. INC. $795.92 SAFETY SUPPLIES
�. 086672 FALCON DISPOSAL SERVICE $23.397.16 GRIT REMOVAL
186673 BAY SAFETY 6 SUPPLY 9623.26 SAFETY SUPPLIES
086674 BANK OF AMERICA $3,299.41 TRAVEL 2 MEETINGS
486673 S. BATEMAN f530.00 DEFERRED COMP DISTRIBUTION
d n 086676 BEECH STREET EMPLOYEE BENFI7 $19.73 APO CHANGE
086677 ROBERT SEIN.WILLIAM FROST 6 AS $1.285.49 ENGINEERING 5-27
086678 SENSE•$ SALES 3 SERVICE $4,407.00 ENGINE REPAIR
I17 686679 BRALCO METALS f68.75 MECHANICAL PARTS
086680 BRITMINEE ELECTRIC f2.761.13 ELECTRONIC METER
Q, �•f(q 086681 BROWN 6 CALDYELL $150.00 LAB SUPPORT
y 086462 BROWN 6 CALDYELL CONSULTING 934.047.26 ENGINEERING SERVICES J-19
�••A 086683 BURKE ENGINEERING CO. f89.18 ELECTRONIC PARTS
(: 086E84 BUSH AND ASSOCIATES. INC. $15,059.00 ENGINEERING SERVICES 2-25
^� 086685 WILLIAM H. BUTLER 5160.82 PETTY CASH
086666 C f It RECONDITIONING CO. 31.255.00 MECHANICAL REPAIRS
5. � 086667 .CWPCA SO. REGIONAL SAFETY $930.06 TRAINING
086688 CAL-CHER SALES $103.74 SAFETY SUPPLIES
486689 CAL-MASS FOR RESEARCH. INC. 340.19 OCEAN SAMPLING
( :I 086690 CAL SOUTH EQUIPMENT CO. S195.00 MAINTENANCE/CALIBRATION OF CHLORINE TANKS
! +;I 686691 CALIF. ASSOC. OF SANITATION $385.00 MEETING REGISTRATION
066692 CARGO. INC. f312.91 AUTOMOTIVE REPAIRS
r• L. 086693 CARLETON ENGINEERS 21.838.25 EVALUATION f AQUISITION OF EMISSIONS CREDITS
086694 JOHN CAROLLO ENGINEERS f95.567.86 C GRIT RACE SERVICES PI-20
086695 JOHN CAROLLO ENGINEERS $83.791.09 ENGINEERING SERVIES PI-22,J-6-2,J-15,P1-22.P1.31
E, •� CM6696 CASTLE CONTROLS, INC. 2268.01 PLUMBING A PIPE
386697 CERADYNE. INC. $1.429.19 USE CHARGE OVERPAYMENT
066698 CNEMYEST INDUSTRIES. INC. f26.089.59 FERRIC CHLORIDE
OBF699 CHEVRON U.S.A.. INC. f14.676.65 FUEL F OIL
086700 CHEVRON OIL FIELD RESEARCH 12,364.64 USE CHARGE OVERPAYMENT
F., CA2FUN0 NO 9199 - JT GIST YOPKING CAPITAL PROCESSING DATE 6/19/87 PAGE 2
I REPORT NUMBER APC3
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 06/24/07
1' WARRANT NO. VENDOR AMOUNT DESCRIPTION
+I 086701 CHICC GAME FISH FARM 351.00 LAB SUPPLIES
086102 COAST PNEUMATICS $60.67 INSTRUMENTATION
�', •I 006703 COMMODORE BOSSINESS MACHINES $1,084.01 USE CHARGE OVERPAYMENT
P86704 CONSOLIDATED ELECTRICAL DIST. $2,779.57 ELECTRONIC PARTS
�I C86765 CONSCLIDATED REPROGRAPHICS $5.630.28 PRINTING
086706 CONTINENTAL CHEMICAL CO 114058.36 CHLORINE
066707 CONTROL DATA CORP. _ S261.62 INSTRUMENT REPAIR
086708 CORMIER SUZUKI - - - $13.934.00 VEHICLES
T�• :•jn 086709 COSTA MESA AUTO SUPPLY $157.29 AUTOMOTIVE PARTS
•sCl 086710 R. E. COULTER CRANE RENTAL $1.830.54 CRANE RENTAL
.la 186711 COUNTY WHOLESALE ELECTRIC $677.25 ELECTRIC PARTS
E. •:Icy 086712 CAL WATER $52.75 LEASE
O6
6713 LARRY CURTI TRUCK 6 EQUIPMENT_ $520.00 TRAILER RENTAL
�+ 0A6Tio - EUSTDBIM PERSONNEL LTD. _ _ s1.A70.50 TEMPORARY SERVICES
^-' OB"IS
CITY OF CYPRESS S1.274.00 MANHOLE ADJUSTING
086711 STATE OF CALIFORNIA $160.00 SBE PROCESS FEE
{{{3 C86716 STATE OF CALIFORNIAI 3880.41 " "
�• # C86719 DATA WEST DIST. $$20.00 OFFICE ADVERTISEMENTS
586726 DAILY PILOT S20.OD ADVERTISEMENTS
086720 DANIELS TIRE SERVICE 5120.49 - AUTOMOTIVE REPAIRS
006721 TOM DAMES 932.33 EMPLOYEE MEETING 6 TRAVEL EXPENSES
-^ •^ 086722 DISCO PRINT COMPANY 3141.79 OFFICE FURNITURE
.� 086723 DORADO ENTERPRISES. INC. $32.517.00 CONTRACT SERVICES R-024
4' "'r 086724 DRIVER TESTING SERVICE $84.00 CONTRACT SERVICES
086729 _ DUNN EDWARDS CORP. _ _ $165.36 PAINT SUPPLIES
,slM 086726 - bYNATRON ELECTRIt Co., INC. - 3175.38 AUTOMOTIVE REPAIRS
('! 086727 YILBER EADS 3115.00 DEFERRED COMP DISTRIBUTION
066728 EASTPAN. INC. $1,977.26 OFFICE SUPPLIES
086729 ENCHANTER. INC. $3.500.00 OCEAN MONITORING SERVICES
f 006730 MARSHALL FAIRRES $345.00 DEFERRED COMP DISTRIBUTION
?l ORE731 FARR SALES S SERVICE $38.16 ELECTRIC PARTS
OA6132 - FEDERAL EMPRESS CORP. " '_. ..",'. ...'."'____.' 3101.00 SHIPPING
E. ..i 006733 FILTER SUPPLY CO. 3783.62 FILTER
;tl 086734 FISCHER O PORTER CO. $1.076.60 CHLORINATION PARTS
086735 FLAT 6 VERTICAL CONCRETE $185.03 CONTRACT SERVICES-CONCRETE CUTTING
986736 FLEXIBLE SYSTEMS $54.13 SAFETY SUPPLIES
086737 FLO•SYSTEMS $3.396.77 PUMP PARTS
686730 GELBER PUMPS. INC. $82.96 PUMP PARTS
' 086739 FOUNTAIN VALLEY CAMERA $9.18 PHOTO PROCESSING
Gt l•� 086749 DONALD L. FOX 3 ASSOCIATES $825.80 SAFETY ENGINEERING SERVICES
�^ 086701 THE FOXBORO COMPANY 3706.59 CONTROL PARTS/TOOLS
e F 0186742 CITY OF FULLERTON 380.03 WATER USEAGE
- I,•I 086743 G.W.M. COMPANY 307.44 ENGINEERING SUPPLIES
I, 086744 GANAML LUMBER CO. 32.575.34 CONSTRUCTION MATERIALS
J If OB 67A5 GARRATT•CALLAHAN COMPANY 33.975.38 CHEMICALS
086746 GENERAL TELEPHONE CO. $8.315.99 TELEPHONE
T
J •; i I
kj FUND 9199 - JT DIST MORNING CAPITAL PROCESSING DATE 6/19/87 PAGE. 3
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 06/24/97
h+ `
^� WARRANT NO. VENDOR AMOUNT DESCRIPTION
P86717 GIERL/CH-NITCHELL. INC. 4111.367.22 MECHANICAL PARTS
+� 686748 THOMAS GRAY E ASSOC., INC. $336.00 LAB SUPPLIES
(; .• 086749 GRINKELL CORPORATION 1369.97 VALVES
046750 H4RDWOO CENTER S212.95 BUILDING MATERIALS
C46751 FRED A. HARPER 61.275.00 DEFERRED COMP DISTRIBUTION
kr �••I 046752 HARRINGTON INDUSTRIAL PLASTICS $453.15 MECHANICAL PARTS
D86753 HARRIS CONVEYOR CO. 11.142.20 EQUIPMENT RENTAL
046754 HATCH 6 KIRK. INC. $766.52 AUTOMOTIVE PARTS
� .•2 086755 HARTGE ENGINEERING CO. $5.325.30 ENGINEERING SERVICES
086756 HOERBIGER C.Y.S. CALIF. . INC. 3690.83 FITTINGS
�FI ON6757 HOOPER CAMERA STONES f191.74 FILM
IRp 086758 R.S. HUGHES CO.. INC. $2.069.24 JANITORIAL SUPPLIES
:D 486759 HUNTINGTON BEACH RUBBER STAMP $471.33 OFFICE SUPPLIES
222aaa OR6760 HUNTINGTON SUPPLY "' $206.70 REPAIR 6 MAINTENANCE MATERIALS
If, 'M-. G86761 HYDROTEX $5.859.85 PETROLIUM PRODUCTS
� �y 346762 MYDRCTEX FIELD SERVICE S196.63 OIL
fTl 086763 IMPERIAL] 'TILE DISTRIBUTORS $523.75 WILDING MATERIALS
086764 INDUSTRIAL STRUCTURES $193.56 BUILDING MATERIALS
086765 INDUSTRIAL THREADED PRODUCTS $260.36 HARDWARE
•to D86766 INGRAM PAPER - $776.51 PAPER
;A(' ^; 1 086767 INLAND EMPIRE EQUIPMENT CO. $273.61 AUTOMOTIVE PARIS
086768 GLENN R. JAMESON $1.975.90 OPERATIONS MANUALS
OBE 769 JOHNSTON PUMP CO. $14,306.82 PUMP
G06770 KAMAN BEARINGS A SUPPLY 5605.72 BEARING
086711 KEENAN SUPPLY $362.52 VALVE
tzi 096772 KERNVIEW OIL CO. - $168.18 USE CHARGE OVERPAYMENT
P.' •� 086773 KING BEARING. INC. f2.780.72 REPAIR 6 MAINTENCE MATERIALS
086774 DONALD E. KINNEY S820.00 DEFERRED COMP DISTRIBUTION
086775 L.B.W.S.. INC. $21.82 300 AMP GROUND LAMPS
Q 086776 LIGHTING DISTRIBUTORS. INC. f443.43 LIGHTINVELECTRIC PARTS
086777 K.P. LINDSTROM, INC. f8r130.00 EIR CONSULTING SERVICES
I( -y 086778 M.G. INDUSTRIES $729.02 OXYGEN, HELIUM. NITROGEN TANKS
L
066.780 HALCDM FINNICELECTRONICS
INC. i5$239.31 ENGINEERING SERVICES-ODOR CONTROL
k., 006781 MARVAC EEECTRONI CS $745.16 ELECTRONIC S PARTS
I 0BF78/ MED-70X ENGA.ASSOC ! EQUIP. f745.18 PUMP PARTS
I•�I L86182 NED-TOX ASSOCIATES. INC. S555.00 LAB ASBESTOS STUDY
?; 686783 MICRO COMPUTER DISTR..IMC• 93.475.60 COMPUTER PARTS
086784 MICRO MOTION $1,946.13 METER REPAIRS
086785 MIDLAND ROSS CORP. 12.135.75 USE CHARGE OVERPAYMENT
086786 MILLERS PRINTERY $258.02 PRINTING
186767 KITCHELL MANUALS. INC. S229.60 MANUALS � .
(: •{ 066788 MOTION INDUSTRIES. INC. S410.26 MECHANICAL PARTS
II •I86789 NATIONAL INFORMATION DATA CTR. S29.95 PUBLICATION
C86790 NEW HENNES. INC. f43.94 EZyORAVING MATERIALS
(1 - OB6791 NEV16K ELECTRONICS $69.51 1 STROMENT PARTS
086792 CITY OF NEWPORT REACH $4.00 WATER MEADE
r'
' J4
4
<; I" FUND NO 9j99 - JT DIST MORNING CAPITAL PROCESSING DATE 6/19187 PAGE 4
_ REPORT NUMBER AP43
1; COUNTY SANITATION DISTRICTS OF ORANGE COUNTY - - -- - -"
( CLAIMS PAID 36/24/87
WARRANT NO. VENDOR AMOUNT DESCRIPTION
( !I086794 OCCIDENTAL CHEMICAL CORP. f9.03A.09 CAUSTIC SODA,
.j 086795 - OCEAN SALT CO.. INC. - 3635.6E SALT
(•' .: C86795 ORA INTERNATIONAL COA ELEC CORP. $20.31 USE TRIRGE OVERPAYMENT
+� 686797 ORANGE COAST ELECTRIC SUPPLY f159.O6 ELECTRIC PARTS
L8E797 ORANGE ELECTVALVE A HEMANIFITTING
S119.67 REPAIR FUSEE
(: 986799 ORANGE VALVE t COMPRESSOR
CO. f2$158.11 FITTINGS
.� 086799 OS TE PBOUER COMPRESS DP SERVICE _ f758.11 COMPRESSOR
OB6800 - COUNTY OF ORANGE — _ - '360'705.22 TOXIC ROUND UP/COMMUNICATION SERVICE AGREEMENT
(. : 086 RO1 COUNTY OF 0,AN 6E $77.151.94 SLUDGE DISPOSAL FEE
086002 COUNTY SANITATION DISTRICT $67.40 EMPLOYEE HEALTH PLAN CONTRIBUTION
OBE803 COUNTY SANITATION DISTRICT $2,044.47 REIMBURSE WORKERS COMP
IF _. 086804 PC MAGAZINE 327.97 SUBSCRIPTION
:. :. __086805 PACIFIC MOLECULAR. INC. 3621.43 MECHANICAL REPIARS '
686606 PACIFEE SAFETY EdUIPMEFiY EO. -51.188.21 - - - SAFETY SUPPLIES
(? ;� 086807 PACIFIC BELL f860.30 TELEPHONE
086908 PACIFIC WELDING t MANUFACTURIN $282.26 SOLDER
C3 086809 PAN WEST $1.455.44 JANITORIAL SUPPLIES
066820 PEAT.MARWLCK.MAIN 6 CO. f8.225.00 PROFFESIONAL SERVICES
_006811 PEERLESS WIPING MATERIALS_CO. f2.153.66 _ TOWELS
085812 R09-PENDEAORAFT"- - S445.D0 REFERRED COMP DISTRIBUTION-
!:('Illrk,� I . 085813 PHOTO t SOUND CO. 366.00 PROJECTION LAMP
^ 1'- 086814 PLAINS TRUEVALUE HARDWARE $331.12 HARDWARE
�v F 086825 POLY ENTERPRISES. INC. $304.75 SAFETY SUPPLIES
086816 PORTER BOILER SERVICE. INC. f418.18 MECHANICAL PARTS
1 086817 POSTMASTER S515.76 USE CHARGE OVERPAYMENT
I _ OB6Bi8 - - POWER SPECIALISTS.-INC. --- -" fi.058.50 -ELECRONIC SUPPLIES
(; • 086819 PREFERRED PERSONNEL AGENCY f530.00 TEMPORARY SERVICES
�- 09682C HAROLD PRIMROSE ICE S150.00 ICE
**�JJ-OOII 086821 THE PROJECTS SOLUTIONS CO. $3,528.00 INSTRUMENTATION INSPECTION
OBES22 PULASKI t ARITA ARCHITECTS $2.980.00 ARCHITECTUAL SERVICES
006823 _ AND ENGINEERING. INC_. _ f2.911.27 ENGINEERING SERVICES
086824 THC RESISTER. LEGAL 1166090 - - -"- "------' - $2.749.04 PUBLIC NOTICES
086825 REMEDY TEMP f544.00 TEMPORARY SERVICES
086826 RICHARDS INDUSTRIES. INC. $929.39 OXYGEN PARTS
086627 RICOP CORPORATION 3216.78 PRINTING 6 PUBLICATION
086820 ROSERTSHAW CONTROLS CO. 3747.65 MECHANICAL PART
-1 1:86829 _ JOSEPH I. RYERSON S SON. INC. $284.10 METAL
086830 -SANTA ANA ELECTRIC MOTORS - S1.822.79 ELECTRIC PARTS
086631 SCIENCE APPLICATIONS INT4 364.664.45 OCEAN MONITORING
086832 SEA COAST DESIGNS $721.86 OFFICE FURNITURE
086833 SEARS. ROEBUCK It CO. $152.35 TOOLS
086834 SHAMROCK SUFPLT $4,910.45 SAFETY SUPPLIES/TOOLS
ri 686835 SHEPHERD MACHINERY CO. 310.23 RECLAMATION PART
086836 SHUR - PLATE CORP. s100.06 USE-CHARGE OVERPAYMENT
1 086A37 SLIDE MAKERS WEST S2.385.(•0 PHOTO PROCESSING
is 086838 SMITH-EMERY CO. f890.40 SOIL 3 CONCRETE TESTING
:. I I
• f; P FUND NO 9199 - JT GIST WORKING CAPITAL PROCESSING DATC 6119/87 FAGE 5
LIT REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
(. CLAIMS PAID 06/24/67
..
WARRANT NO VENDOR(II,I AMOUNT DESCRIPTION
086839 SOIL ANO TESTING ENGINEERS $8,656.78 SOIL TESTING/CONSULTING
086800 SO. COAST AIR QUALITY $6,210.00 PERMIT FEES
j (` I'l 086801 SOUTHERN CALIF. EDISON CO. S309r909.25 POWER
I , 086842 SOUTHERN COUNTIES OIL CO. $4.256.37 DIESEL FUEL
D86863 SPARKLETTS DRINKING WATER 127.00 DRINKING WATER/RENTAL
986R00 STAROV STEEL $4.843.09 STEEL
bj 086845 STAR TOOL { SUPPLY CO. $1,844.59 70OLS
I 086846 SUMMIT STEEL $277.58 MECHANICAL PARTS
1' 086907 SUNSET FORD $313.85 TRUCK PARTS
1 ITT COGA48 SUPELCO. INC. f167.55 OCEAN SAMPLING
0B68g9 SUPER CHEM CORP $1.614.38 JANITORIAL/CHEMICALS
�.� 086850 THE SUPPLIERS $1.226.71 SAFETY SUPPLIES/TOOLS
0B6B5L SVEE TAX ND ANT CO. f60.26 FITTINGS
086853 TAN TR-DUNNE 52.164.15 LANDSTRUCK APE
PAR
l f60.15 TRUCK PARTS
r ($ .On 086853 TAYLOR-DUNK
AF1 086459 TI COR TITLE INSURANCE $$36.04 TITLE REPORT
0868556 TRAFFIC CONTROL SERVICE. INC. 188.60 TRUCKINSTRUMENT
PARTS
C�. 086857 TRAVEL TRAVE INC. $432.00 INSTRUMENT REPAIR
086859 TRAVEL TRAVEL ,676.88 TRAVEL SERVICES
086859 TRUCK f AUTO SUPPLY. INC. 3q$532.74 AUTOMOTIVE PARTS
,I/'• 086859 J.G. TUCKER { SON. INC. f532.00 INSTRUMENT PARTS
•`I k9 086861 THING LABORATORIES $2.224.00 LAB INSPECTION
086862 UMA EN I KEEPING. INC. 62$515.17 ENGINEERING 5-26
(?I OB68E2 U.S.O. CORP. f515.00 SAFETY SUPPLIES
086863 UNITED OUND SERVICE SERVI ALERT 980.00 MEMBERSHIP FEES
OSE865 UNITED PARCEL SERVICE 290.00 SNIPPING
i' IAI7 08E865 UNITED WESTERN ELCVAIOP $290.O0 ELEVATOR MAINTENANCE
'-I C86867 UNIVERSAL MARK S380.64 OFFICE SUPPLIES
�(n C86868 USER-. TESTING
INC. 11.631.76 AUTOMOTIVE PARTS
Ea fl CB6868 V.O.C. TESTING 116.800.00 1"EMISSIONS TESTS
086869 VAR SCIENTIFIC $1.055.20 PORT VPPLIES
ALVES
i� 066671 VALCO INSTRUMENTS CO. f1r 689.20 PORT VALVES
066872 VALCOM 510.87 MECHANICAL PARTS
GB6B 72 VALLEY CITIES SUPPLY CO. f2 r510.e7 PIPES 6 iITTIN05
.' t86PT3 VAREC DIV. OF EMERSON $1.961.00 MECHANICAL PARTS
046870 VERTEX FUSSINESS INTERIORS $43.23 RESTOCKING CHARGE ON RETURNED MATERIAL
�.I t86B 15 VISAIRE $99.02 ELECTRIC PARTS
O86876 Y.V. PRODUCTS, INC. S580.23 SAFETY SUPPLIES
(; 086877 JOMN R. VAPLES S439.36 ODOR CONTROL SERVICES
.� 086878 WAUKESHA ENGINE SERVICENTER $326.57 GASKET
086879 WEST COAST ANALYTICAL SRV. f059.00 LAL SERVICES
n86P80 WESTERN WIRE f ALLOY $360.40 WELDING SUPPLIES
OP 6 P81 WILLOAN ASSOCIATES $8.333.23 ENGINEERING SERVICES
186882 DRESSER-RANG $717.85 COMPRESSORS
^� C868B3 ' XEROX CORP. $1.722.35 PRINTING 6 PUBLICATION
OB6884 MORRIS YING 510.98 EMPLOYEE MILEAGE
r � x
SS
FUND NO 9199 - JT DIST WORKING CAPITAL _ PROCESSING DATE 6/1c/87 PtGE 6
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 06/24/87 �
WARRANT ANT N0. VENDOR AMOUNT DESCRIPTION
I{'
NS 6Rb5 CITY OF YORBA LINDA $60,695.00 REFUND OF OVERPAYMENT/ENGINEERING SERVICES
086886 YORBA LINDA COUNTY WATER GIST $08.26 RENTAL EQUIPMENT
(0 ;j 0868E7 2IEBARTH AND ALPER 5173.3T5.48 CONSTRUCTION P2-30
486888 RICHARD B. EDGAP $228.19 DIRECTORS COMP $ MEETING EXPENSE
868EYN HNNT 90 0.3 DIRECTORS MTG CASA
D
• �} n� 8689D 90 JAM
JANES YAXNCN 2 OI0.ECTOftS MTG LgSA
------
4i TOTAL CLAIMS PAID 06/24/87 _- $1.531,191.20e
va '
2 � Ill
.SUMMARY
01 OPER FUND $ 784.40
rn 01 ACO FUND 441.04
1 02 OPER FUND 6.184.49
�+ ' 02 ACO FUND _ 17,OOO.70
:.3D-
_.02 F/R FUND __._._.__— .__.__._.....-.—.— 2:154.03
P3 OPER FUND 12.075.80 ,
1 05 OPER FUND 7510.16
.' 95 AID FUND 4:189.74
06 OPER FUND 284.56
07 OPER FUND 2,295.O8
.. __ .07 F/R FUND. ____—_._____.. _ _ ...... ___.... 170.00..-.
011 OPER FUND 5.702.19
113 OPER FUND 3,090.00 '
! /13 F/R FUND 61,800.00
Q /14 OPER FUND 480.00
/596 OPER FUND 3,120.47 !'
,. 1566 ACO FUND .. ___.._._.__—..... ._ _.. _ .._.___.. 19,33. .... .•
0697 OPER FUND 32.51
{ Ci /7914 0PER FUND 4557.91
JT. OPER FUND 761:865.85 ;
CORI, 510,293.98
c. .�I SELF FUNDED WORKERS COMP INSURANCE FUND 2.064.20 1
- JT MORNING CAPITAL —--- - 109.074.40 }
; $1.531.191.20 L
r
r
RESOLUTION NO. 87-61-1
AUTHORIZING FILING FOR FEDERAL. AND STATE
CLEAN WATER GRANTS AMID LOANS - 1987-88
JOINT ;ARKS INPROVIIMM AND ADDITIONS
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
SANITATION DISTRICT NO. 1 OF ORANGE COUNTY,
CALIFORNIA, AUTHORIZING AND DIRECTING THE E}UI,ITTTON
AND FILING OF DOCUMENTS NECESSARY FOR FEDERAL AM
STATE CLEAN WATER GRANTS AND LOANS UNDER 33 U.S.C.,
1251 ET SEQ.; AND CHAPTERS 12.5, 13, 14 AND 15; AND
DIVISION 7 OF THE CALIFORNIA WATER CODE ON BEHALF
OF COUNTY SANITATION DISTRICTS NOS. 2, 3, 5, 6, 7,
11, 13 AND 14 OF ORANGE COUNTY, CALIFORNIA, AND
PROVIDING CERTAIN ASSURANCES
x x x x x x x x x x x x x x x x
The Board of Directors of County Sanitation District No. 1 of Orange
County, California,
DOES HEREBY RESOLVE, DETERMINE AND ORDER THAT:
Section 1: An Act of Congress ]mown as the Federal Water Pollution
Control Act, as amended (also known as the Clean Water Act and the Water Quality
Act of 1987) (33 U.S.C., 1251 et seq.) provides for federal grants and loans for
construction of sewage treatment works.
Section 2: The State Clean Water Bond Laws of 1970, 1974, 1978 and 1984
authorize the State Water Resources Control Board to enter into contracts with
public agencies for State grants and loans for construction of sewage treatment
works.
Section 3: County Sanitation District No. 1 of Orange County is a
separate and distinct agency organized under Chapter 3, Part 3, Division 5, of
the Health and Safety Code of the State of California, for the purpose of
constructing, operating and maintaining a major trunk sewer system for the
collection of sewage from the cities and other local sewering agencies, and has
joined with other County Sanitation Districts - namely, County Sanitation
"C-1" AGENDA ITEM #11(a) - ALL DISTRICTS "C 1"
Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, in constructing, operating and
maintaining joint sewage treatment plants and disposal facilities under an
agreement dated July 1, 1985, known as the Joint Ownership, Operation and
Construction Agreement.
Section 4: In accordance with the terms of said Joint Ownership,
Operation and Construction Agreement, County Sanitation District No. 1 of orange
County, California acts for itself and as agent for County Sanitation Districts
Nos. 2, 3, 5, 6, 7, 11, 13 and 14 of orange County, California, each organized
for similar purposes and serving different territories, all in Orange County,
California, for the purpose of constructing and operating said joint sewage
treatment plants and disposal facilities.
Section 5: By means of this Resolution and of the Resolutions set forth
below by number, the following County Sanitation Districts of Orange County,
California have authorized the filing of applications for grants and loans under
said Acts of Congress and said Clean Water Bond Laws and have authorized County
Sanitation District No. 1 to file said applications on their behalf:
DISTRICT NO. RFS0=CN NO.
2 8742-2
3 87-63-3
5 87-64-5
6 87-65-6
7 87-66-7
11 87-67-ll
13 87-68-13
14 87-69-14
"C-2" AGENDA ITEM #11(a) - ALL DISTRICTS "C-2"
Section 6: J. Wayne Sylvester, General Manager, is hereby authorized and
�.d directed to sign and file for and on behalf of County Sanitation District No. 1
of orange County, California, acting for itself and as agent for County
Sanitation Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14 of orange County,
California, Application for a Federal Grant and/or Iran for Sewage Treatment
Works under 33 U.S.C., 1251 et seq., and a State Grant and/or Ivan for Clean
water under the Clean Water Bond Laws of 1970, 1974, 197a and 1984, for a joint
project generally described as follows:
1987-88 Joint Works Improvements and Additions
Section 7: District No. 1, acting for itself and as agent for County
Sanitation Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, hereby agrees and
further does authorize the aforementioned representative to certify that if a
federal grant or loan for its project is made pursuant to the Federal Water
Pollution Control Act, as amended (33 U.S.C., 1251 et seq.) , it will pay the
ruining cost of the approved project; it will provide proper and efficient
operation and maintenance of the approved project after completion of
construction thereof; it will comply with Title VI of the Civil Rights Act of
1964 (F.L. 88-352) and the regulations issued purcnant thereto and state that
the assurance and compliance with such regulations attached to the application
for federal grant or loan applies to this project; and it will comply with
requirements of Executive Order 1-1246 pertaining to equal employment opportunity
in federally-assisted construction contracts.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"C-3" AGENDA ITEM #11(a) - ALL DISTRICTS „C-3"
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 1 of 3
P. 0. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
GRANT NO. N/A
C. 0. NO. Four 4
CONTRACTOR: MARGATE CONSTRUCTION, INC. DATE June 2, 1987
JOB: REHABILITATION OF DOMES AND SLUDGE PUMP MIXING SYSTEMS FOR DIGESTERS
D 6 AT PLANT 1 -
Amount of this Change Order (Add) (Deduct) $ 13,967.39
In accordance with contract provisions, the following changes 1n the contract
and/or contract work are hereby authorized and as compensation therefor, the
following additions to or deductions from the contract price are hereby approved.
Item 1 PIPE PENETRATIONS
The contractor was directed to remove two abandoned pipe penetrations in the
digester walls and make necessary concrete repairs to seal the holes. These
penetrations were not shown on the contract drawings. The holes had to be sealed
to prevent the digester gases from escaping into the atmosphere.
ADDED COST THIS CHANGE ORDER ITEM $ 918.64
TIME EXTENSION THIS CHANGE ORDER ITEM 0 Calendar Days
Item 2 WALKWAY AND OVERFLOW BOX CONCRETE
The contractor was directed to remove, replace and make repairs to concrete on
the existing walkways near one of the new overflow boxes and at the new
stairway platforms. The need for the new concrete and the repairs was not
shown on the contract drawings and was accomplished in the best interest of the
District.
ADDED COST THIS CHANGE ORDER ITEM $ 1,294.33
TIME EXTENSION THIS CHANGE ORDER ITEM 0 Calendar Days
Item 3 MISCELLANEOUS PIPING
The contractor was directed to realign 8-inch sludge piping to fit the new sludge
grinder at Digester No. 6 and to fabricate and install pipe spools to fit pump
at pad at Digester No. 6. Neither the existing piping , nor the piping as shown
on the plans, would align with the new equipment specified to be installed. This
additional work included labor and materials needed to make the system work as
designed.
ADDED COST. THIS CHANGE ORDER ITEM $ 4,051.47
TIME EXTENSION THIS CHANGE ORDER ITEM 0 Calendar Days
"D-1" AGENDA ITEM #11(b) (1) - ALL DISTRICTS "D-1"
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 2 of 3
P. 0. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
`WIWI
GRANT NO. N/A
C. 0. NO. Four 4
CONTRACTOR: MARGATE CONSTRUCTION, INC. DATE June 2, 1987
JOB: REHABILITATION OF DOMES AND SLUDGE PUMP MIXING SYSTEMS FOR DIGESTERS
5 AND 6 AT PLANT N . 1 - JOB N . P -061 -1
Item 4 HANGERS AND SUPPORTS
The contractor was directed to provide and install additional hangers and
supports for the digester gas piping at both digesters. Several supports and
hangers were inadvertantly omitted from the contract documents. The additional
work was necessary to provide stability for the gas piping and fittings.
ADDED COST THIS CHANGE ORDER ITEM $ 4,597.32
TIME EXTENSION THIS CHANGE ORDER ITEM 0 Calendar Days
Item 5 SUCTION LINE MODIFICATIONS
The contractor was directed to modify the base supports for the digester suction
line at both digesters. The base supports, which are mounted in the center
floor of the digester, had to be modified to allow grit to flow to and be pumped
from the center depression of the digesters. This modification to the suction
line supports was deemed necessary based on current information received from
other departments within the District.
ADDED COST THIS CHANGE ORDER ITEM $ 3,105.63
TIME EXTENSION THIS CHANGE ORDER ITEM Calendar Day
TOTAL ADDED COSTS THIS CHANGE ORDER $ 13,967.39
TOTAL TIME EXTENSION THIS CHANGE ORDER 0 Calendar Days
The additional work contained within this Change Order can be performed incidental to
the prime work and within the time allotted for the original Contract and any
revisions to the Contract Time made by this and any previously issued Change
Orders. It is therefore mutually agreed that no time is required for this
Change Order, and no direct or indirect, incidental or consequential costs or
expenses have been or will be incurred by Contractor.
SUMMARY OF CONTRACT TIME
Original Contract Date June 4, 1986
Original Contract Time 365 Calendar Days
Original Completion Date June 3, 1987
Time Extension this C.O. - 0 Calendar Days
Total Time Extension 0 Calendar Days
Revised Contract Time 365 Calendar Days
`...' Revised Completion Date June 3, 1987
"D-2" AGENDA ITEM #11(b) (1) - ALL DISTRICTS "D-2"
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 3 of 3
P. 0. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
GRANT NO. N/A
C. 0. NO. Four
CONTRACTOR: MARGATE CONSTRUCTION, INC. DATE June 2, 1987
JOB: REHABILITATION OF DOMES AND SLUDGE PUMP MIXING SYSTEMS FOR DIGESTERS
AND 6 AT PLANT N - JOB N . PN-061R-1
Original Contract Price $ 1,595,000.00
Prev. Auth. Changes $ 18,042.35
This Change (Add) (8edwO) $ is'9 .39
Amended Contract Price $ 1,627,00
Board Authorization Date: July 8, 1987
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
RECOMMENDED BY:
onstr c/ 9
tion manager
MARGATE CONSTRUCTION, INC.
ACCEPTED BY: APPROVED BY:
ontractor r c i6gineering
"D-3" AGENDA ITEM #11(b) (1) - ALL DISTRICTS "D-3"
RFSOU.ITION NO. 87-70
ACCEPTIFii JOB No. PW-061R-1 AS mmPLEIE
A JOINT RESOUJTICN OF THE BOARDS OF DIREx1OR5 OF
COUNTY SANrIATION DISTRICTS MS. 1, 2, 3, 5, 6, 7,
ll, 13 AND 14 OF ORANGE COIINTY, CALIFORNIA, ACCEPTING
REEABILITATION OF OQ`4ES AND SLUDGE Puv bmm. SYSTEMS
FOR DIGESTERS 5 AND 6 AT RBCIP 4ATICN PLANT NO. 1, JOB
NO. PW-061R-1, AS COMPLETE AND APPROVING FINAL
CLOSDOUT AGP024EW
The Boards of Directors of County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7,
21, 13 and 14 of Orange County, California,
DO HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. That the contractor, Margate Construction, Inc., has completed the
construction in accordance with the terms of the contract for Rehabilitation of Dares
and Sludge Pump Mixing Systems for Digesters 5 and 6 at Reclamation Plant No. 1, Job
No. PW-061R-1, on June 3, 1987; and,
Section 2. That by letter the Districts' Director of Engineering has
recommended acceptance of said work as having been completed in accordance with the
terms of the contract, which said recatmendation is hereby received and ordered
filed; and,
Section 3. That Rehabilitation of Dames and Sludge Pun¢> Mixing Systems for
Digesters 5 and 6 at Reclamation Plant No. 1, Job No. PW-061R-1, is hereby accepted
as completed in accordance with the terms of the contract therefor, dated June 4,
1986; and,
Section 4. That the Districts' Director of Engineering is hereby authorized
and directed to execute a Notice of Canpletion therefor; and,
Section 5, That the Final Closeout Agreement with Margate Construction, Inc.,
setting forth the terns and conditions for acceptance of Rehabilitation of Dames and
bd
"E-1" AGENDA ITEM .#11(b) (2) - ALL DISTRICTS "E-1"
Sludge Pap Mixing System for Digesters 5 and 6 at Reclamation Plant No. 1, Job
No. PW-061R-1, is hereby approved and accepted in form approved by the General
Counsel: and,
Section 6. 7hat the Chairman and Secretary of District No. 1, acting for
itself and on behalf of Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, are hereby
authorized and directed to execute said agreement of behalf of the Districts.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"E-2" AGENDA ITEM #11(b) (2) - ALL DISTRICTS "E-2"
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 1 of 3
P. 0. BOX 8127 - 10844 ELLIS .AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
GRANT NO. N/A
C. 0. NO. Three 3
CONTRACTOR: ZIEBARTH AND ALPER DATE June 1, 1987
JOB: ADVANCED PRIMARY TREATMENT CHEMICAL ADDITION FACILITIES AT PLANT NO. 1,
Job No. P1-28 and ADVANCED PRIMARY TREATMENTCHEMICAL ADDITION FACILITIES
AT PLANT NO. 2, Job No. P -36
Amount of this Change Order (Add) (8edust) . $ 14,196.00
In accordance with contract provisions, the following changes in the contract
and/or contract work are hereby authorized and as compensation therefor, the
following additions to or deductions from the contract price are hereby approved.
Plant No. 1, Job No. P1-28
Item 1 EXTEND POLYMER DRAIN AND BARRICADE CONTROL PANEL
The contractor was directed to provide labor and materials to extend the polymer
drain under the polymer truck unloading station to protect the area in case
of an accidental spillage during the filling of the polymer storage tanks. The
design of the drain was not large, enough to include that area where the delivery
truck makes its attachment to the storage tank piping. Additional pipe bollard
guard posts were installed at the enlarged drain and at the electrical control
panels for the pumps to protect them from being accidentally bumped and damaged
by the delivery truck.
ADDED COST THIS CHANGE ORDER ITEM $ 5.268.00
TIME EXTENSION THIS CHANGE ORDER ITEM 7 Calendar Days
Plant No. 2, Job No. P2-36
Item 2 PROVIDE FLOOR DRAIN
The contractor was directed to install a fl oor drain in the new Polymer Pump
Building with piping to a sump in the tunnel underneath. No drain had been
provided to wash down or clean the floor of the pump room in the event of a
polymer spill . Polymer is very "slippery" material and thus quite hazardous
when wet if not promptly cleaned up at the time of a spill ,
ADDED COST THIS CHANGE ORDER ITEM $ 1,276.00
TIME EXTENSION THIS CHANGE ORDER ITEM 2 Calendar Day
"F-1" AGENDA ITEM #11(c) - ALL DISTRICTS "F-1"
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 2 of 3
P. 0. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
GRANT NO. N/A
C. 0. NO. Three 3
CONTRACTOR: ZIEBARTH AND ALPER DATE June 1, 1987
JOB: ADVANCED PRIMARY TREATMENT CHEMICAL ADDITION FACILITIES AT PLANT NO. 1,
Job No. PI-28 and ADVANCED PRIMARY TREATMENT CHEMICAL ADDITIONFACILITIES
T PLANT NO. 2, Jo o. P2-3
Item 3 MODIFY DOOR AT POLYMER BUILDING
The contractor was directed to modify or reposition two (2) mandoors in the new
Polymer Building at Plant No. 2. The original design had allowed the mandoors
to open to the inside the building. The new openings were saw cut, the doors
repositioned and the original openings formed and filled with concrete. The
doors now open outwardly to comply with safety requirements. Costs include
labor and material to complete this work.
ADDED COST THIS CHANGE ORDER ITEM $ 5,478.00
TIME EXTENSION THIS CHANGE ORDER ITEM 7 Calendar Days
Item 4 ADDITIONAL FERRIC CHLORIDE PIPING -
The contractor was directed to add a PVC piping line from Pump A in the Ferric
Chloride Pump Roam to Splitter Box A. There were lines running from Pumps B and
C to Splitter Boxes B and C, however, no lines running to Splitter Box A. The
costs include labor and material to complete this work.
ADDED COST THIS CHANGE ORDER ITEM $ 2,174.00
TIME EXTENSION THIS CHANGE ORDER ITEM I Calendar Day
TOTAL ADDED COSTS THIS CHANGE ORDER $ 14,146.00
TOTAL TIME EXTENSION THIS CHANGE ORDER 17 Calendar Days
"F-2" AGENDA ITEM #11(c) - ALL DISTRICTS "F-2"
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 3 of 3
P. 0. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
GRANT NO. N/A
C. 0. NO. Three
CONTRACTOR: ZIEBARTH AND ALPER DATE June 1, 1961
JOB: ADVANCED PRIMARY TREATMENT CHEMICAL ADDITION FACILITIES AT PLANT N0. 1,
0 o. P1-2 and- ADVANCED PRIMARY RE CHEMICAL O L TIE
T PLANT NO. 2, Job No. P -36
The additional work contained in this Change Order can be performed incidental to
the prime work and within the time allotted for the original Contract plus the 17
days time extension granted hereby. It is , therefore, mutually agreed that no
time extension other than the 17 days approved herein is required for this Change
Order and no direct or indirect, incidental or consequential costs or expenses
have been or will be incurred by Contractor.
SUMMARY OF CONTRACT TIME
Original Contract Date November 14, 1986
Original Contract Time 150 Calendar Days
Original Completion Date April 12, 1987
Time Extension this C.O. 17 Calendar Days
Total Time Extension 17 Calendar Days
Revised Contract Time 167 Calendar Days
Revised Completion Date April 29, 1987
Original Contract Price $ 910,800.00
Prev. Auth. Changes $�,255��
This Change (Add) (9eduet) $ 1
Amended Contract Price $ 97F-6—lUff—
Board Authorization Date: July 8, 1987
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
RECOMMENDED BY:
Y ems. g
onst coon Mana er
ZIEBARTH AND ALPER
ACCEPTED BY: APPROVED BY:
antra � Director of Engineering
F-3" AGENDA ITEM #11(c) - ALL DISTRICTS "F-3"
• - COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 1 of 2
P. 0. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
GRANT NO. N/A
C. 0. NO, even
CONTRACTOR: ZIEBARTH AND ALPER DATE une 2, 198
JOB: INSTALLATION OF REPLACEMENT BELT FILTER PRESSES AT PLANT NO. 2
JOB NO. P2-2 -1
- Amount of this Change Order (Add) (&edueb) $ 10,956.00
In accordance with contract provisions, the following changes in the contract
and/or contract work are hereby authorized and as compensation therefore, the
following additions to or deductions from the contract price are hereby approved.
Item 1 CENTRATE PUMP CONTROLS
The contractor was directed to add a bubbler level system in conjunction with
the controls for the centrate pumps. The pressure switches and other controls
had been taken out of service sometime in the past and the system left completely
inoperative. The system was redesigned to include a bubbler system to insure
the proper operation of the centrate pumps.
ADDED COST THIS CHANGE ORDER ITEM $ 5,589.00
TIME EXTENSION THIS CHANGE ORDER ITEM 6 Calendar Days
Item 2 MODIFY BELT PRESS DRAINS
The contractor was directed to modify the belt press drain with special fittings
and hoses to avoid interference with the concrete basin walls and the filter
press belt on the underside of the unit. The drain piping as originally designed
would not work due to lack of clearance. The angle of the piping was changed and
flexible connections added to provide adequate clearance between the filter belts
and the drain basin wall . (Reference FCO #36)
ADDED COST THIS CHANGE ORDER ITEM $ 5,367.00
TIME EXTENSION THIS CHANGE ORDER ITEM 12 Calendar Days
TOTAL ADDED COSTS THIS CHANGE ORDER 8 10,956.00
TOTAL TIME EXTENSION THIS CHANGE ORDER 18 Calendar Days
"G-1" AGENDA ITEM #11(d) - ALL DISTRICTS "G-1"
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 2 of 2
P. 0. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALLEY, CALIFORNIA 92708
CHANGE ORDER
GRANT NO. N/A
C. 0. NO. Eleven 11
CONTRACTOR: ZIEBARTH AND ALPER DATE June 2, 19
JOB: INSTALLATION OF REPLACEMENT BELT FILTER PRESSES AT PLANT NO. 2
JOB -1
The additional work contained in this Change Order can be performed incidental to
the prime work and within the time allotted for the original Contract plus the 18
days time extension granted hereby. It is, therefore, mutually agreed that no
time extension other than the 18 days approved herein is required for this Change
Order and no direct or indirect, incidental or consequential costs or expenses
have been or will be incurred by Contractor.
SUMMARY OF CONTRACT TIME
Original ontract Date February 24, 1986
Original Contract Time 450 Calendar Days
Original Completion Date May 19, 1987
Time Extension this C.O. 18 Calendar Days
Total Time Extension 18 Calendar Days
Revised Contract Time 468 Calendar Days
Revised Completion Date June 6, 1987
Original Contract Price $ 3,747,747.00
Prev. Auth. Changes $ 111 ,3 0—.0—
This Change (Add) (Dad -at) $ 0�
Amended Contract Price $ 3,869,083.20
Board t on zat on Date: July 8, 1987
COUNTY SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNIA
RECOMMENDED BY:
R.
onst uction Manager
ZIEBARTH AND ALPER
ACCEPTED BY: APPROVED BY`:/w
/vrGRr i`
-contractor rector� o Engineering
"G-2" AGENDA ITEM k11(d) - ALL DISTRICTS „G-2„
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY Page 1 of 1
P. O. BOX 8127 - 10844 ELLIS AVENUE
FOUNTAIN VALIM, CALIPMWIA 92708
CHANGE ORDER
GRANT N0. N/A
C. 0. Imo. One (1)
C DNT1tAC1OR: Falcon Disposal Services, Inc. DATE June 22, 1987
JOB: Removal of Grit at Plant No. 2, Specification No. M-029
Anoint of this Change Order (AM) (Deduct) $ (5,000.00)
In accordance with contract provisions, the following changes in the contract
and/or contract work are hereby authorized and as c®pennsation therefor, the
following additions to or deductions from the contract price are hereby approved.
The contractor has requested that the requirement for aggregate liability
insurance be reduced from $3,000,000 as specified in the specifications to
$1,000,000 to more closely affect the liability exposure for this project at a
contract deduction of $5,000. This is acceptable to the Districts.
TOTAL DEDUCT THIS CHANGE ORDER: $(51000.00)
TIME EXTENSION THIS CHANGE ORDER: 0 Calendar Days
The additional work curtained within this Change Order can be performed incidental
to the prime work and any change order work issued to date and within the time
allotted for the original contract, and any revisions to the Contract Time made by
this arrd any previously issued Change Orders. It is therefore mutually agreed
that no other time is required for this charge order, and no direct or indirect,
incidental or consequential costs or expenses have been or will be incurred by
Contractor.
Original Contract Price $ 2,027,520.00
Prev. Auth. Changes $ 0.00
This Change (Add) (Deduct) $ (5,000.00)
Amended Contract Price $ 2,022,520.00
Board Authorization Date: July 8, 1987
Approved:
00[RM SANITATION DISTRICTS OF
ORANGE COUNTY, CALIFORNL4 .
Recommended by:
FALCON DISPOSAL SERVICES, INC.
7/8/87
Construction Manager
By - 7/8/87 By. 7/8/87
Contractor Director of Engineering
"H" AGENDA ITEM #11(P) - ALL DISTRICTS "H"
RESOLUTION NO. 87-71
APPROVING PLANS AND SPECIFICATIONS
FOR JOB NO. J-16
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS
OF COUNTY SANITATION DISTRICTS NOS. 1, 2, 3, 5,
6, 7, 1.1, 13 AM 14 OF ORANGE COUNTY, CALIFORNIA,
APPROVING PLANS AND SPECIFICATIONS FCR LIGHTIM
CONSERVATION FACILITIES AT PLANTS 1 AND 2, JOB
NO. J-16
x x x x x x x x x x x x x x x x
LEAS, Boyle Engineering Corporation, Districts' engineers, have completed
preparation of the plans and specifications for Lighting Conservation Facilities at
Plants 1 and 2, Job No. J-16.
NOW, THEREFORE, the Boards of Directors of County Sanitation Districts Nos. 1,
2, 3, 5, 6, 7, 11, 13 and 14 of Orange County, California,
DO HEREBY RESOLVE, DETERKENE AM ORDER:
Section 1. That pursuant to the Districts' Guidelines Implementing the
California Environmental Quality Act of 1970, as amended, the Districts have
concurrently undertaken an environmental review of the proposed project and hereby
determine that said project is categorically exempt from further CEQA requirements;
and,
Section 2. That the project for construction of Lighting Conservation
Facilities at Plants 1 and 2, Job No. J-16, is hereby approved, and that the
Secretary be directed to file any documents required by said Guidelines Implementing
the California Environmental Quality Act of 1970, as amended; and,
Section 3. That the detailed plans, specifications and contract docimients this
day submitted to the Boards of Directors by Boyle Engineering Corporation, Districts'
engineers, for construction of Lighting Conservation Facilities at Plants 1 and 2,
Job No. J-16, are hereby approved and adopted; and,
d
"I-1" AGENDA ITEM #11(f) - ALL DISTRICTS "I-1"
Section 9. That the Secretary be authorized and directed to advertise for bids
for said work pursuant to the provisions of the Public Contracts Cade of the State of
California; and,
Section 5. That the General Manager be authorized to establish the date and
time at which said bids will be publicly opened and read; and,
Section 6. That the Secretary and the Districts' Director of Engineering or
his designee be authorized to open said bids on behalf of the Boards of Directors.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"I-2" AGENDA ITEM #11(f) - ALL DISTRICTS "I-2"
RESOLUTION NO. 87-72
ACCEPTING SPECIFICATION NO. R-024 AS COMPLETE
A JOINT RESOLUTION OF THE BOARDS OF DTRELRl7RS OF COUNTY
SANITATION DISTRICTS NOS. 1, 2, 3, 5, 6, 7, 11, 13 AND
14 OF ORANGE COUNTY, CALIFORNIA, ACCEPTING REHABILITATION
OF NO. 4 TRICKLING FILTER AT RECLAMATION PLANT' NO. 1,
SPECIFICATION NO. R-024, AS COMPLETE AND APPROVING FINAL
CLOSEOUT AGREEMENT
t x x x x x x x x x x x x x x x
The Boards of Directors of County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7,
11, 13 and 14 of Orange County, California,
DO HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. That the contractor, Dorado Enterprises, Inc., has carpleted the
construction in accordance with the terms of the contract for Rehabilitation of No. 4
Trickling Filter at Reclamation Plant No. 1, Specification No. R-024, on June 8,
1987; and,
Section 2. That by letter the Districts' Superintendent has recamrended
acceptance of said work as having been completed in accordance with the terms of the
contract, which said recamtendation is hereby received and ordered filed; and,
Section 3. That Rehabilitation of No. 4 Trickling Filter at Reclamation Plant
No. 1, Specification No. R-024, is hereby accepted as caTpleted in accordance with
the terms of the contract therefor, dated February 18, 1987; and,
Section 4. That the Districts' Superintendent is hereby authorized and
directed to execute a Notice of Completion therefor; and,
Section 5. That the Final Closeout Agreement with Dorado Enterprises, Inc.,
setting forth the terms and conditions for acceptance of Rehabilitation of No. 4
Trickling Filter at Reclamation Plant No. 1, Specification No. R-024, is hereby
approved and accepted in form approved by the General Counsel; and,
"J-1" AGENDA ITEM #11(g) - ALL DISTRICTS "J-1"
Section 6. That the Chairman and Secretary of District No. 1, acting for'
itself and on behalf of Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, are hereby v
authorized and directed to execute said agreement on behalf of the Districts.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"J-2" AGENDA ITEM #11(g) - ALL DISTRICTS "J-2"
COUNTY SANITATION DISTRICTS
.1 ORANGE CORN". CALIFORNIA
June 23, 1987 1e �Av f
11:00 a.m. no.BOXHIV
�..�� 2 ADDENDA W AIN VAU Y.m.uwwas MM4127
(7,naea. 11
BID TABULATION
S H E E T
SPECIFICATICI4 NOS. R-025-1 and R-025-2
Underground Tank Replacement at Plant No. 1 and
PFO= TIME Underground Tank Replacement at Plant No. 2
PRDJECr DESCRIPTICN Remove existing tanks and replace with EPA-approved
tanks, install secured fuel system
ENGINEER'S ESTIMATE $ 307,700 BUDGET AMOUNT $ 200,000
OITTrPACTOR TOTAL BID a�
1. Sancon Engineering, Inc., Santa Ana, CA $ 305,185.00
2. Charles E. Thomas Company, Gardena, CA $ 549,591.00
I have reviewed the proposals submitted for the above project and find that the
low bid is a responsible bid. I, therefore, recolmleEd award to Sancon
Engineering, Inc. in the bid amount of $305,185.00 as the lowest and best bid.
'pumas M. Dawes
Director of Engineering
"K-1" AGENDA ITEM #110)(3) - ALL DISTRICTS "K-1-
RESOLUTION NO. 87-73
AWARDING SPECIFICATION NOS. R-025-1 AND R-025-2
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS
OF COUNTY SANITATION DISTRICTS NOS. 1, 2, 3, 5,
6, 7, 11, 13 AND 14 OF ORANGE COUNTY, CALIEUUM,
AWARDING CONTRACT FOR UNDERGROUND TANK REPLACET74T
AT PLANT NO. 1, SPECIFICATION NO. R=025-1, AND
UNDERGROUND TANK REPLACEMENT AT PLANT NO. 2,
SPECIFICATION No. R-025-2
The Boards of Directors of County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7,
11, 13 and 14 of Orange County, California,
DO HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. In accordance with the Districts' Guidelines Implementing the
California Environmental Quality Act of 1970, as amended, the Boards of Directors, on
June 10, 1987, authorized filing a Notice of Exemption in connection with the
proposed project for Underground Tank Replacement at Plant No. 1, Specification
No. R-025-1, and Underground Tank Replacement at Plant No. 2, Specification
No. R-025-2; and,
Section 2. That the written recommendation this day submitted to the Boards of
Directors by the Districts' Director of Engineering that award of cgntract be made to
Sancon Engineering, Inc. for Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground Tank Replacement at Plant No. 2,
Specification No. R-025-2, and bid tabulation and proposal submitted for said work
are hereby received and ordered filed; and,
Section 3. That the contract for Underground Tank Replacement at Plant No. 1,
Specification No. R-025-1, and Underground Tank Replacement at Plant No. 2,
Specification No. R-025-21 be awarded to Sancon Engineering, Inc. in the total amount
of $305,185.00 in accordance with the terms of their bid and the prices contained
therein; and,
Section 4. That the Chairman and Secretary of District No. 1, acting for
"K-2" AGENDA ITEM #11(h) (3) - ALL DISTRICTS "K-2"
itself and as agent for Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, are hereby
authorized and directed to enter into and sign a contract with said contractor for
said work, pursuant to the specifications and contract doawents therefor, in form
approved by the Cameral Counsel; and,
Section 5. That all other bids for said work are hereby rejected.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"K-3" AGENDA ITEM #11(h)(3) - ALL DISTRICTS ".K-3"
Big I.CU(h11Oa
BLUEPRINTING, PIR)T00040NIG RI10 0I.I[0 S[R11 C[S
' SPICIIJ[CIIIUIIOA. ISO, 5-011 '
910 aftmill June 9. 1901
CODIUCI UPS Di Jvlf 16, 1901
lh....h deal, 11, 19e8 xllb epllan tar . aneye.r oleos lDn.
I....Massa Cents...its OCe Isobar
,a....rgHO onpnlu et"N'. hlo [hears.,
Cast. sees Ira.t 1"1" Iw.t. Duth
Ilnll el i+[Ciao neriee Iveuee baiioe M0 oe I nanae .191,00 .ones[
Urn eu W. Van bid (It. s.n old ol. mu 614 Set.
Sndtel 9eaae4.e nr.=eq hly Casts M1iR teal+ ,It, Cost, I'll, Call,
2000
1.ee.d feel to ,eats. I .SO I900. 1 .50 900.00 1 .la 11110.00 t .9f 111P..
t. Inuele ea.e +y.11. .ff ,S}O." .H 512.10 LIf 11160.00 LA Iev0.00
1. Sh...h 9I0
1. lan6 Lapl of a9.1t. •10 11.50 .61 HAS .19 so.. .IS slats
t. t.n.b 1. nu.. 20 Ib. a,.A. .IS 'Ns.00 Be. 21I.00 I.If 'IS.. 1.3s Casa o0
C. sera. 9500 S 9900 l... Walnuts
1.1.100 par ... .01 II.00 .Ott $9.10 .01 160.00 .10 710.00
t. Joe-$ 0 per top .01f I'S.0) .Ott MAN .01 IIO.Oo .la 1100.00
1. 501.1.M per ton at .of
1. LO01 LHO per top •01 If.1111.0 .02. 11.060.0 Of If1,B00.0
!. "XI ,
.00 1 ery per mf •Ot- .Ot, .Oa '.Of
6. Cal ar 'task gee. X f.00 Ila.00 1.00 110.00 l.0 t)a.. 10.00 310.00
1. role..u.r Per n WOO 10.00 10.0 10.0 pR .14 no bid .12
-0. re11e bl.e rw,hma air 111 1.50 e1.50 3.00 195.00 IA0 110.00 IAO 210.00
,heat+
1. SOIn1 Plans 'Nehl.a far Ise 3.00 a1•000.0 3.00 11,000.0 4.00 Is•am.. 1.00 131160.
,nett,
I. Tell. 11nd1.9
1. t... then II JMtU qlp .1, I1.00 .50 16.00 2.00 11.00 Me, 16.00
I. I$ sheet, 1e Its .beat, "1., .10 .10 .60 .60 ?.Do Leo 3.00 3.01
J. 1t! (beat, 1 larger .plot .10 .40 .10 .60 2.0 L00 ).of J..'
0. ! 1ra1 elnatny
i. lu. i.e. 15 "'.1, ,Olnt JO 11s0.0v .30 160.00 .el :Ub.aO Ll0 ISsa.o
L is .be.,, to Its .heal. ,elnt •10 t00,a0 .10 f0v.00 L!1 ,1060.t0 L!0 1140.0.
). tls ahvU I Ivpr 101ne •lo IL sr0.0 .l0 t1.110. LU et,)ts.: )40 Its,ets.
n. pMlear.pbl�ss .,I.�S.
1. Doubt, a... gee. at..... ...h 1.09 Ia." Lav Ia.TO J." 30.00 0.00 to.
L ec......I cash 1. 0 10.0 i.e. Is.. J." If AO ..W W.
I. Fan Iw Species Peanut.,o.
l lr lfpl.v.•..e1er n.MIG he. SO." Same, Ie.Hth u1.5e 2s.001 1150.0n S.A. 2500.00
1. ones ln9nebk Pere l,u In _
Gn)et'... r1101.1a.9wan1.
1. 11loos ... .I, . t.d.%a
1. U.. nee. ea0, to, taea. It a as. Lae Lao L1s Lu Lea 1.0o 1.UP ..o .
t. 11.e n.,-WILtad.t IS It. LSD I1.0. tes ff.sv 1.00 m.00 r.So n.
1. not se9• I2.1e, teed IS a ),IS U.00 Leo sr.60 0.00 91.00 ❑.Oa 4t.
1. l .. ."eats.. rb I...b. . a ).se L9f e.00 e.00 la.00 10.a
Rees. u56
!. ane ne!•• 1 I l0.
toW tsf6 1•10 4.10 Leo S.0 r.as )JS IT.. Sion
e1e1 u.
{. nee1.i... nova )a ) IL .So Lsa M. l.ta SAID Sala MIND I'm
'mod fss6
[add $.se Llo {.II 6ts 11.50 I1.f0 If.. 19.00
I. I.
Ira).is., .00101 nr 1.r Sall. LIS $5.00 LIS $1.00 Ov 10.00 I.oo II0.00
I(r.asble)
). Cent.<1 .001.10 XI I.e LSO L!p •L10 L90 l.l0 1.50 1:15 l.If
It....bltl gala.
J. TWO!=IH
I. Ulese letier. .01. Sel ,0•li. . .)s lis .9. 110.0. 1.le lase.. IGe IOf0.o0
t. fob vplv. .NJ On-
pgtbl. ......
Jf ......
s.0 .90 U0.00 LSv 10f0.. LSn IOfO.ao
S. Ilexes ben tO IS. sae
W. See.[ ,C•n. .04 I.IVO.or .el 14, .a1 1.600.ou .01 :1,6a0.o
1. Ilve sloe. e.I,,d It I...
t0 16., ua. Spael w.li •al .o .ell AIY .D1 .01 .1. 1f5
5. ebd u.e, to 16. md.
sic. Saeae lu n, .a1 .o apt .01 Ave .. .e. ,a6
{. 101115.e, ocesdl.l q
m 14. , 10.0.
sae. 1pet1 It.It• •01 .0 .01• .olf .ro .Iv nee n1e
I. pb.r La.n, ve. sea. la•n. ass nO.Di .30 1a0.. .es lvP.. ds 1sP.
lelhls II,)L�L tltt )f,o�l.6l 19t.911.11 169,0�9.16
Il ts reteeme.ded that the and be aad, to Cvn+v116.1a41 Ree,.r,phl,,, the feu bidder oa the ..Jeri!,
eI Its Items. that represents the e.a.11 I"fit cost to the Districts• she annual expenditure (e, less
jtt'�I ltla.tee at I's. ..
eater �1 ..,cur llfth ,ammende tl on:
iFe.., �1. Pen,, of Set- tvr OTE.g�r9
"L" AGENDA ITEM #110 ) - ALL DISTRICTS "L"
COUNTY SANITATION DISTRICTS
' OF ORANGE COUNTY, CALIFORNIA
P.O. BOX 8127. FOUNTAIN VALLEY. CALIFORNIA 92728-8127
q 10844 ELLIS. FOUNTAIN VALLEY, CALIFORNIA 92708-7018
(714)962-2411
June 30, 1987
Boards of Directors
County Sanitation Districts of Orange County
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Subject: Certification of Negotiated Fee for Addendum No. 3 to
Architectural Services Agreement in Connection with
Administration Building Addition, Job No. J-7-4
In accordance with the Districts' procedures for selection of professional
architectural services, the Selection Committee has negotiated the
following fee with Pulaski and Arita Architects, Inc. for Addendum No. 3
to the design of Administration Building Addition, Job No. J-7-4, for
design of a heating and cooling system using waste heat from central power
generation systems on an hourly-rate basis including labor plus overhead
and fixed profit, for an additional amount not to exceed $10,867.
Professional Architectural Services,
(hourly labor rates including
overhead at 1508), not to exceed $ 9,767
Fixed Profit 1,100
TOTAL ADDENDUM, not to exceed $10,867
The Selection Committee hereby certifies the above final negotiated fee
as reasonable for the services to be performed and that said fee will not
result in excessive profits for the consultant.
/s/Don R. Griffin /s/Don E. Smith
Don R. Griffin Don E. Smith
Joint Chairman Vice Joint Chairman
Selection Committee Selection Committee
/s/Thomas M. Dawes
Thomas M. Dawes
Director of Engineering
Selection Committee
"M" AGENDA ITEM #11(i ) (1) - ALL DISTRICTS "M"
RESOLUTION NO. 87-74
APPROVING ADDENDUM NO. 3 TO AGREEMENT WITH
PULASKI AND ARITA, AR(MITECTS, INCORPORATED,
FOR DESIGN OF ADMINISTRATION BUILDING
ADDITION, JOB NO. J-7-4
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS
OF COUNTY SANrIATION DISTRICTS NOS. 1, 2, 3, 5,
6, 7, 11, 13 AND 14 OF ORANGE COUNTY, CAIMUINIA,
APPROVING ADDENDUM No. 3 TO AGREEMENT WriH
PUTAS I AND ARITA, ARCHITECTS, INCORPORATED, FOR
DESIGN OF ADMINISTRATION BUILDIN: ADDITION, JOB
NO. J-7-4, PROVIDING FOR MODIFICATIONS TO HEATING,
VENrI ATION AND CUOLING SYSTEM
WHEREAS, the Districts have heretofore entered into an agreement with
Pulaski and Arita, Architects, Incorporated, for design of Administration Building
Addition, Job No. J-7-4; and,
WHEREAS, Addendum No. 1 to said agreement expanded the scope of work to
analyze peripheral support office space needs, internal site traffic circulation
and design a new main entrance at Plant No. 1 (Master Plan of Support Facilities
for Plant No. 1); and,
WREREAS, Addendum No. 2 provided for additional work to design Modifications
to the Existing Administration Building, Job No. J-7-5; and,
WFIERF.AS, it is now deemed appropriate to further amend the agreement with
Pulaski and Arita, Architects, Incorporated, to provide for additional design
services to modify the heating, ventilation and cooling system; and,
WHEREAS, the Selection Committee has negotiated and certified a fee for said
additional services, in accordance with established procedures for selection of
professional engineering and architectural services.
NOW, THEREFORE, the Boards of Directors of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County, California,
"N-1" AGENDA ITEM #11 U)(2) - ALL DISTRICTS "N-1"
DO HEREBY RESOLVE, DES AND ORDER:
Section 1. That Addandum No. 3 dated July 8, 1987, to that certain
agreement dated July 10, 1985, by and between County Sanitation District No. 1,
acting for itself and on behalf of County Sanitation Districts Nos. 2, 3, 5, 6, 7
11, 13 and 14, for design of Administration Building Addition, Job No. J-7-4,
providing for additional design services to modify the treating, ventilation and
cooling system, is hereby approved and accepted; acid,
Section 2. That the contract provision for fees be increased, on an
hourly-rate basis for labor including overhead at 150%, plus fixed profit, by an
additional amount not to exceed $10,867.00, increasing the wxirmam authorized
rnmpensation from $237,000.00 to an amount not to exceed $247,867.00; and,
Section 3. That the Chairnen and Secretary of District No. 1, acting for
itself and on behalf of Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, are hereby
authorized and directed to execute said Addendum No. 3 in form approved by the
General Counsel.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"N-2" AGENDA ITEM #11(j )(2) - ALL DISTRICTS "N-2"
COUNTY SANITATION DISTRICTS
OF ORANGE COUNTY, CALIFORNIA
P.O. Box a127, FOUNTAIN VALLEY, CALIFORNIA 92728-8127 `.,►'
10944 ELLIS, FOUNTAIN VALLEY.CALIFORNIA 92708-7018
(714)982-2411
June 30, 1987
Boards of Directors
County Sanitation Districts of Orange County
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Subject: Certification of Negotiated Fee for Professional Services
Agreement in Connection with Phase I Improvements of Master Plan
of Support Facilities, Site and Security Improvements at
Treatment Plant No. 2, Job No. P2-35-1
In accordance with the Districts' procedures for selection of professional
services, the Selection Committee has negotiated the following fee with
Pulaski and Arita Architects, Inc. for the design of Phase I Improvements
of Master Plan of Support Facilities, Site and Security Improvements at
Treatment Plant No. 2, Job No. P2-35-1, on an hourly-rate basis including
labor plus Overhead, direct expenses and fixed profit, for a total amount
not to exceed $97,000.
Professional Services, (hourly labor
rates plus overhead at 1508),
riot to exceed $ 82,250
Direct Expenses, not to exceed 750
Fixed Profit 10,375
TOTAL CONTRACT, riot to exceed $ 93,375
The Selection Ccmmittee hereby certifies the above final negotiated fee
as reasonable for the services to be performed and that said fee will not
result in excessive profits for the consultant.
/s/Don R. Griffin /s/Don E. Smith
Don R. Griffin Don E. Smith
Joint Chairman Vice Joint Chairman
Selection Co mittee Selection Committee
/s/Thomas M. Dawes
Thomas M. Dawes
Director of Engineering
Selection Committee
110, AGENDA ITEM #11(k)(1) - ALL DISTRICTS 110"
RESOLUTION NO. 87-75
APPROVING AGREEMENT WITH PUTASKI AND ARITA,
ARCNIITECI'S, INCORPORATED, FOR DESIGN OF JOB
NO. P2-35-1
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS
OF MUM SANITATION DISTRICTS NOS. 1, 2, 3,
5, 6, 7, 11, 13 APED 14 OF ORANGE COUNTY,
CALIEM IA, APPROVING AGREE2fEPPT WITH PULASKI
AND ARITA, ARCHITECTS, INCORPORATED, FOR DESIGN
OF PHASE I IMPROVEMENTS OF MASTER PLAN OF
SUPPORT FACILITIES, SITE AND SECURITY IMPRUM22M
AT TRFA'IM NT PLANT NO. 2, JOB NO. P2-35-1
kMZEA<S, the Boards of Directors of County Sanitation Districts Nos. 1, 2,
3, 5, 6, 7, 11, 13 and 14 of Orange County have heretofore adopted a policy
establishing procedures for the selection of professional engineering and
architectural services: and,
WHEREAS, pursuant to said procedures an agreement has been negotiated with
Pulaski and Arita, Architects, Incorporated, for design of Phase I Improvements
of Master Plan of Support Facilities, Site and Security Improvements at
Treatment Plant No. 2, Job No. P2-35-1; and,
WIEREAR, pursuant to authorization of the Boards of Directors on April 8,
1987, the Selection Committee, established pursuant to said procedures, has
negotiated and certified the final negotiated fee for said services.
NOW, THEREFORE, the Boards of Directors of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7, ll, 13 and 14 of Orange County, California,
DO HEREBY RESOLVE, DETERMINE APED ORDER:
Section 1. That the certain Professional Services Agreement dated July 8,
1987, by and between County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13
and 14 of Orange County and Pulaski and Arita, Architects, Incorporated, for
design of Phase I Improvements of Master Plan of Support Facilities, Site and
"P-1" AGENDA ITEM #11(k) (2) - ALL DISTRICTS "P-1"
Security Improvements at Treatment Plant No. 2, Job No. P2-35-1, is hereby
approved and accepted; and,
Section 2. That payment for said services is hereby authorized in
accordance with the provisions set forth in said agreement, as follows:
Professional Services, at hourly rates
for labor plus overhead at 150% $82,250.00
Direct Expenses, not to exceed 750.00
Fixed Profit 10,375.00
TOTAL CONMAM, not to exceed $93,375.00
Section 3. That the Chairman and Secretary of District No. 1, acting for
itself and on behalf ofDistricts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, are hereby
authorized and directed to execute said agreement in form approved by the
General Counsel.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"P-2" AGENDA ITEM #11(k)(2) - ALL DISTRICTS "P-2"
COUNTY SANITATION DISTRICTS
OF ORANGE COUNTY, CALIFORNIA
IBA P.O.sox a127.FOUNTAIN VALLEY. CALIFORNIA 9272&8127
op,� tea' 108"ELLIS.FOUNTAIN VALLEY. CALIFORNIA 9270&7018
(714)962-2411
June 30, 1987
Boards of Directors
County Sanitation Districts of Orange County
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Subject: Certification of Negotiated Fee for Engineering Services
Agreement in Connection with Miscellaneous Modifications and
nVrovements to Facilities at Treatment Plant No. 2, Job
No. P2-37
In accordance with the Districts' procedures for selection of professional
engineering services, the Selection Conittee has negotiated the following
fee with Brown and Caldwell Consulting Engineers for design and related
services re Miscellaneous Modifications and Improvements to Facilities at
Treatment Plant No. 2, on an hourly-rate basis including labor plus
overhead, direct expenses and fixed profit, for a total amount not to
exceed $364,000.
Engineering Services, (hourly labor
rates plus overhead at 1858), not to
exceed $ 322,000
Direct Expenses, riot to exceed 10,000
Fixed Profit 32,000
10TAL NNrFACr, riot to exceed $ 364,000
The Selection Ommittee hereby certifies the above final negotiated fee
as reasonable for the services to be performed and that said fee will not
result in excessive profits for the consultant.
/s/Don R. Griffin /s/Don E. Smith
Don R. Griffin Don E. Smith
Joint Chairman Vice Joint Chairman
Selection Committee Selection Committee
/s/Thomas M. Dawes
Thomas M. Dawes
Director of Engineering
Selection Committee
"0" AGENDA ITEM #11( 1 ) (1) - ALL DISTRICTS "0"
RESOLUTION NO. 87-76
APPROVI% AGREEMENT W'= BROWN AND CALONZEL
CONSULTING ENGINEERS FOR DESIGN OF JOB NO. P2-37
A JOINT RESOLUTION OF THE BOARDS OF DIRECTORS
OF COUNTY SANITATION DISTRICTS NOS. 1, 2, 3,
5, 6, 7, 11, 13 AND 14 OF ORANGE COUNTY,
CALIEORNIA, APPROVING AGREFP= WITH BROWN AND
CALDWEL CONSOLTIET, ENGISffii.S FOR DESIQ] AM
RELATED SERVICES RE MI-SCELLANEOUS MODIFICATIONS
AND IM1*OVE2'= TO FACILITIES AT TREATMENT
PLANT NO. 2, JOB NO. P2-37
MIERRAR, the Boards of Directors of County Sanitation Districts Nos. 1, 2,
3, 5, 6, 7, 11, 13 and 14 of Orange County have heretofore adopted a policy
establishing procedures for the selection of professional engineering and
architectural services; and,
WHEREAS, pursuant to said procedures an agreenent has been negotiated with
Brown and Caldwell Consulting Engineers for design and related services re
Miscellaneous Modifications and LT:provements to Facilities at Treatment Plant
No. 2, Job No. P2-37; and
WHEREAS, pursuant to authorization of the Boards of Directors on May 13,
1987, the Selection Camittee, established pursuant to said procedures, has
negotiated and certified the final negotiated fee for said services.
NOW, THEREFORE, the Boards of Directors of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7, ll, 13 and 14 of Orange County, California,
DO HEREBY RESOLVE, DETEP= AND ORDER:
Section 1. That the certain Engineering Services Agreement dated July 8,
1987, by and between County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13
and 14 of Orange County and Brown and Caldwell Consulting Engineers, for design
and related services re Miscellaneous Modifications and laprovements to
"R-1" AGENDA ITEM #110 ) (2) - ALL DISTRICTS "R-1"
Facilities at Treatment Plant No. 2, Job No. P2-37, is hereby approved and
accepted; and,
Section 2. That payment for said services is hereby authorized in
accordance with the provisions set forth in said agreement, as follows:
Engineering Services, at hourly rates
for In plus overhead at 185% $322,000.00
Direct Expenses, not to exceed 10,000.00
Fixed Profit 32,000.00
TOTAL CONTRACT, not to exceed $364,000.00
Section 3. That the Chairman and Secretary of District No. 1, acting for
itself and on behalf of Districts Nos. 2, 3, 5, 6, 7, 11, 13 and 14, are hereby
authorized and directed to execute said agreement in form approved by the
General Counsel.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"R-2" AGENDA ITEM #11( 1 )(2) - ALL DISTRICTS "R-2"
RF50LUTION NO. 87-77
APPROVIM AND AU7HORIZ1W EXECUTION OF
GRANT OF FASEHU?r TO SOUTHERN CALIFORNIA
EDISON COMPANY
A RESOLUTION OF THE HOARDS OF DIRECTORS
OF COMM SANITATION DISTRICTS NOB. 1, 2,
3, 5, 6, 7, 11, 13 AND 14 OF ORANGE Court Y,
CALIFORNIA, APPROVIZZ AND AUTHORIZING
EXECUTION OF GRANT OF EA.SEZ N= 70 SOUTHERN
CALIFORNIA IDISON COMPANY RE INSTALLATION
AND MA MENANCE OF S(S7C FACILITIES ON
DIS'IRICrS' PROPERTY IN ORDER TO PROVIDE
SEPARATE ELECTRICAL SERVICE TO ATIMnISMATION
AND LABORATORY BUIIDIIT,S
The Boards of Directors of County Sanitation Districts Nos. 1, 2, 3, 5, 6,
7, 11, 13 and 14 of Orange County, California,
DO HEREBY RESOLVE, DN'TERM F AND ORDER:
Section 1. That the certain Grant of Easement dated July 8, 1987, wherein
the Cwmty Sanitation Districts of Orange County grant a service easement to the
Southern California Edison Company to install and maintain SCEC equipment at
Districts' Reclamation Plant No. 1 site, in the vicinity of the northeast corner
of the Administration Building fronting on Ellis Avenue, in the City of Fountain
Valley, is hereby approved; and.
Section 2. That the real property over which said easement is granted is
more particularly describer) and shown on Exhibits "A" and "B", attached hereto
and made a part of this resolution; and,
Section 3. That said easement is granted to Southern California Edison
Canny for installation and maintenance of equipment in order to provide
separate electrical service to the Districts' Administration and Laboratory
buildings; and,
Section 4. That said easement is granted at no cost to Southern
"S 1" AGENDA ITEM #11(o) - ALL DISTRICTS "S 1"
California Edison Canpanyr and,
Section 5. That the Chairman and Secretary of County Sanitation District
No. 1, acting for itself and on behalf of Districts Nos. 2, 3, 5, 6, 7, 11, 13
and'14, are hereby authorized and directed to execute said Grant of E ant in
form approved by the General Counsel.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"S-2" AGENDA ITEM #11(o) - ALL DISTRICTS "S-2"
COUNTY SANITATION DISTRICTS
M ORANGE COUNTY. CAUFORNIA
June 23, 1987 1d a Av E
11:00 a.m, PM MX SIV
1 ADDENDUM wuxrux Vu .uuwn m s2m�/
BID TABULATION
S H E E T
CONTRACT NO. 1-15R
PROJECT TITLE Santa Ana/Dyer Road Trunk Sewer Manhole Rehabilitation
PROTECT DESCRIPTION Rehabilitate 25 manholes on Santa Ana and Dyer Road
Trunk Sewers
R=NEER'S ESTIMATE $ 100,000 BUDGET AMOUNT $ 150,000
CCfIIRACTCR TOTAL BID
1. Sancon Engineering, Inc., Santa Ana, CA $ 139,000.00
I have regiewed the proposal submitted for the above project and find that the
low bid is a responsible bid. The project has extensive control requirements
which may not have been fully reflected in the Engineer's Estimate and
discouraged other contractors. I, therefore, recommend award to Sancon
Engineering, Inc. in the bid amount of $139,000.00 as the lowest and best bid.
G i Dawes
M. Oawes
Director of Engineering
"T-1" AGENDA ITEM #11(p)(2) - DISTRICT 1 "T-1"
RESOLUTION NO. 87-90-1
AWARDING =4TRACT NO. 1-15R
A RESOLUTION OF THE BOARD OF onur= OF COUNTY SANITATION
�✓ DISIRICI NO. 1 OF ORAIY COUNTY, CALIIORNIA, AWARDING CONTRACT
FOR SANPA ANA./DYER ROAD TRUNK SEWER MANHOLE REHABILITATION,
CONTRACT NO. 1-15R
r r r r r r r r r r r r r
The Board of Directors of County Sanitation District No. 1 of Orange
County California,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. In accordance with the Districts' Guidelines Implementing the
California Environmental Quality Act of 1970, as amended, the Baird of
Directors, on February ll, 1987, authorized filing a Notice of Exemption in
connection with the proposed project for Santa Ana/Dyer Road Trunk Sewer Manhole
Rehabilitation, Contract No. 1-15R; and,
Section 2. That the written recommendation this day submitted to the
Boards of Directors by the Districts' Director of Engineering that award of
contract be made to Sancon Engineering, Inc. for Santa Ana/Dyer Road Trunk Sewer
Manhole Rehabilitation, Contract No. 1-15R, and bid tabulation and proposal
submitted for said work are hereby received and ordered filed; and,
Section 3. That the contract for Santa Am/Dyer Road Trunk Sewer Manhole
Rehabilitation, Contract No. 1-15R, be awarded to Sancon Engineering, Inc. in
the total amount of $139,000.00, in accordance with the terns of their bid and
the prices contained therein, and,
Section 4. That the Chairman and Secretary of the District are hereby
authorized and directed to enter into and sign a contract with said contractor
for said work, pursuant to the specifications and contract dccimients therefor,
in form approved by the General Counsel; and,
Section 5. That all other bids for said work are hereby rejected.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
�.d
"T-2" AGENDA ITEM #11(p) (2) - DISTRICT 1 "T-2"
RESOLUTION NO. 87-91-2
APPROVES', AGREEMENT WITH THE CITY OF GARDEN GROVE
RE COOPERATIVE PROJECT FOR CONSTRUCTION OF DISTRICT
CONTRACT NO. 2-26-1 AND A CITY STORM DRAIN
A RESOLUTION OF THE HOARD OF DIRANRS OF COUNTY
SANr'a'n'rON DISTRICT NO. 2 OF ORANGE COUNTY,
CALITMTI4, APPROVING AGRMI 2dT WITH THE CITY OF
GARDEN GROVE FMa VE TO A COOPERATIVE PROJECT TO
CONSTRUCT A PORTION OF THE E7CLJD INTERCEPTOR
SEWER, CONTRACT NO. 2-26-1, AND A CITY STORM DRAIN
WHEREAS, the District has identified the need for an interceptor sewer
line in Euclid Avenue between Lampson Avenue and Chapman Avenue in its
Consolidated Master Plan of Trunk Sewers for Districts Nos. 2, 3 and 11, which
has been designated as a Portion of the Euclid Interceptor Sewer, Contract
No. 2-26-1; and,
WHEREAS, the City of Garden Grove has identified the need for the
construction of a storm drain between Lampson Avenue and Chapman Avenue, which
is in the proximity of a portion of the District's project; and,
WHEREAS, public inconvenience can be minimized and a cost savings can be
realized by the joint construction of the District's sewer line project and the
City's proposed storm drain.
NOW, THEREFORE, the Hoard of Directors of County Sanitation District No. 2
of Orange County, California,
DOES HEREBY RESOLVE, DETERMTTac' AND ORDER:
Section 1. That the certain Agreement dater] by and between
County Sanitation District No. 2 and the City of Garden Grove, relative to a
cooperative project to construct District's Contract No. 2-26-1, Portion of the
Euclid Interceptor Sewer, between Lampson Avenue and Orangewood Avenue, and a
"U-1" AGENDA ITEM #11(r) - DISTRICT 2 "u 1'
City storm drain between Iampson Avenue and Chagnan Avenue, is hereby approved
and accepted; and,
�.d Section 2. That said cooperative project shall be administered by County
Sanitation District No. 2 in accordance with the terms and conditions of the
agree<rest. The City of Garden Grove shall pay all costs associated with
construction of the storm drain project, including engineering design,
excavation, surveying, inspection and contract administration, estimated to be
$1,800,000, and,
Section 3. That the Chairman and Secretary of District No. 2 are hereby
authorized and directed to execute said agreement in form approved by the
General Counsel.
PASSED AND ADDPTED at a regular meeting held July 8, 1987.
"U-2" AGENDA ITEM #11(r) - DISTRICT 2 "U-2"
RESOLUTION No. 87-92-7
APPROVING AND AUTHORIZING ACCEPTANCE OF
GRANT DEED FROM A & R, A CALIFORNIA
r.TMT^ED PARTNERSHIP, CONVEQG OWNERSHIP
BEAR STREET RELIEF TRUNK SEWER TO DISTRICT
A RESOLUTION OF THE BOARD OF DIRECTORS OF
COUNTY SANITATION DISTRICT NO. 7 OF ORANGE
NUNTY, CALIFORNIA, APPROVING AND AUTHORIZING
ACCEP'BU CE OF GRANT DEED FROM A & R, A
CALIFORNIA LD1ITED PARTNERSHIP, CONVEYING
OWNERSHIP OF THE BEAR STREET RELIEF TRUNK
SEWER, COTPRACI' NO. 7-6-IA, TO THE DISTRICT
x x x x x x x x x x x x x x x x
WHEREAS, A & R, a California Limited Partnership, developer of property
located in the City of Costa Mesa, constructed certain facilities known as the
Bear Street Relief Trunk Sewer, Contract No. 7-6-1A, in order to facilitate
development of this property; and,
WHEREAS, A & R wishes to dedicate the Bear Street Relief Trunk Sewer to
County Sanitation District No. 7; and the Costa Mesa Sanitary District desires
said District to own, operate and maintain these facilities.
NOW, THEREE-ORE, the Board of Directors of County Sanitation District No. 7
of Orange County, California,
DOES HEREBY RESOLVE, DETERMrn;F` AMID ORDER:
Section 1. That the certain Grant Dead dated , wherein the
Hear Street Relief Trunk Sewer pipeline and appurtenances (Contract No. 7-6-1A)
located between Sunflower Avenue and South Coast Drive in Bear Street in the
City of Costa Mesa, are deeded to County Sanitation District No. 7, is hereby
accepted from A & R, a California Limited Partnership; and,
Section 2. That the real property to be deeded is more particularly shown
on Exhibit "A" attached hereto and made a part of this resolution; and,
Section 3. That said Grant Deed is granted at no cost to the District;
and, ..
"V-1" AGENDA ITEM #11(v) - DISTRICT 7 "V-1"
Section 4. That the Secretary of the Board of Directors is hereby
authorized and directed to record said Grant Dead in the official Records of
Orange County, California.
PASSED AND ADOPTED at a regular neeting held July 8, 1987.
"V-2" AGENDA ITEM #11(\i) - DISTRICT 7 "V-2"
RESOLUTION NO.
ESTABLISHING THE ANNUAL APPROPRIATIONS LIMIT
FOR FISCAL YEAR 1987-88 FOR THE DISTRICT IN
ACCORDANCE WITH THE PROVISIONS OF DIVISION 9
OF TITLE 1 OF THE CALIFORNIA GOVERNMENT ODDE
A RESOLUTION OF THE BOARD OF DDWIOR.S OF COUNTY
SANITATION DISTRICT NO. OF ORANGE COUNTY, CALIFORNIA
ESTABLISHING THE ANNUAL APPROPRIATIONS L=T FOR
FISCAL YEAR 1987-88 FOR TBE DISTRICT IN ACCORDANCE
WITH THE PROVISIONS OF DIVISION 9 OF TITLE 1 OF THE
CALIFORNIA GOVERNMENT CODE.
WHEREAS, Article XIII B of the constitution of the State of California as
proposed by the Initiative Measure approved by the people at the special
statewide election held on November 6, 1979, provides that the total annual
appropriations subject to limitation of each local government shall not exceed
the appropriations limit of such entity for the prior year adjusted for changes
in the cost of living and population except as otherwise specifically provided
for in said Article; and,
PE MEAS, the State Legislature added Division 9 (con encing with Section
7900) to Title 1 of the Government Code of the State of California to implement
Article XIII B of the California Constitution; and,
PUME B, Section 7910 of the Government Code provides that each year the
governing body of each local jurisdiction shall, by resolution, establish its
appropriations limit for the following fiscal year pursuant to Article XTII B at
a regularly-scheduled meeting or a noticed special neeting and that fifteen (15)
days prior to such meeting, documentation used in the determination of the
appropriations limit shall be available to the public; and,
WHEREAS, Section 7902 (a) of the Governrent Cale sets forth the method for
determining the appropriations limit for each local jurisdiction for the
"W-1" AGENDA ITEM #15 - ALL DISTRICTS "W-1"
1987-88 fiscal year; and,
WHEREAS, THE Board of Directors wish to establish the appropriations limit
for fiscal year 1987-88 for the District.
NOW, TORE, the Board of Directors of County Sanitation District No.
of Orange County, California,
DOES HEREBY FUM, RESOLVE AND ORDER:
Section 1: That it is hereby found and determined that the documentation
used in the determination of the appropriations limit for County Sanitation
District No._ of Orange County, California, for fiscal year 1987-88, was
available to the public in the Finance Department of said District at least
fifteen (15) days prior to this date.
Section 2: That the appropriations limit for fiscal year 1987-88 for
County Sanitation District No._ of Orange County, California, as established in
accordance with Section 7902(a) of the California Goverment Code is $
which sum is within the maximum authorized spending limitation for fiscal
year 1987-88.
Section 3: The determination of the appropriation limit is based upon the
best and most complete information available at this time. The District
reserves the right to review and re-establish a new and different limit in the
event that it subsequently determines that a modification of the limitation
amount is appropriate.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"W-2" AGENDA ITEM #15 - ALL DISTRICTS -W-2"
RESOLUTION NO.
DIRECTING COUNTY AUDITOR-CON1'ROLLER TO `••/
ODLLECT SEWER SERVICE CHAR&ES ON 1987-88
PROPERTY TAX BILLS
A RESOLUTION; OF THE BOARD OF DIRECTORS OF
COUNTY SANITATION DISTRICT No. OF ORANGE
COUNTY, CALIFURNIA, DIRECTING THE NUNfY
AUDITOR-CONTROLLER TO INCLUDE SUM SERVICE
CHARGES ON THE 1987-88 PROPERTY TAX BILLS
WHEREAS, the Board of Directors of County Sanitation District No. _ has
heretofore adopted Ordinance No. _, An Ordinance of the Board of Directors
of County Sanitation District No. _ Establishing/Amending Sanitary Seams
Service Charges; and,
WHEREAS, California Health & Safety Code Section 5473 provides that such
charges, as adopted by District Ordinances, may be collected on the County tax
roll in the same manner, by the same persons, and at the same time as, together
with and not separate from, its general taxes.
NOW, THEREFORE, the Board of Directors of County Sanitation District
No. _ of Orange County, California.
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. That pursuant to California Health & Safety Code Section 5473,
the County Auditor-Controller is hereby ordered and directed to include sewer
service charges, as established by Ordinance No. _, on the 1987-88 property
tax bills in the same manner, by the same persons, and at the same time as,
together with and not separate from, the general taxes; and that such sewer
service charges be included on the annual property tax bills for each year
thereafter, for so log as the rates do not change and this resolution ruins
in effect; and, .
�a✓
"X-1" AGENDA ITEM #16 - DISTRICTS 1,5,6 & 13 "X-1"
Section 2. That pursuant to California Health & Safety Code Section 5473,
`✓ this resolution shall remain in full force and effect until amended or repealed
or until such time as the rate of sexes service charges, as established by
Ordinance No. _, is changed; and,
Section 3. That the General Manager be, and is hereby, authorized and
directed to execute any necessary documents or agreements to effect the order
set forth in Section 1 herein.
PASSM AND ADOPI D at a regular meeting held July 8, 1987.
"X-2" AGENDA ITEM #16 - DISTRICTS 1,5,6 & 13 "X-2"
• COUNTY SANITATION DISTRICTS
.1 ORANGE COUNTY. CAUFORNIA
June 30, 1987
va sox m1a
r NN Va Y.uuwmm smrmk�/
STAFF SUMMARY n+n aezx�+
Negative Declaration re
North Airport Diversion Sewer, Contract No. 7-10 and
South Airport Diversion Sewer, Contract No. 7-10-1
In December 1986, the District received a Notice to Edelocate the South Irvine
subtrunk (extension of the Michelson Drive Subtrunk) which crosses the John
Wayne Airport in a northwesterly direction fran Michelson Drive and MacArthur
Boulevard on the east side of the airport to Airport Loop Drive near Airway
Avenue on the west side. The relocation is necessary to acmnmodate
construction of a new airport terminal proposed near the intersection of
MacArthur Boulevard and the 405 freeway. Since the notice was received, staff,
consultants and Directors have studied options to carply, including alternate
relocation alignments, and selected the alignment known as the North Airport
Diversion Sewer, an easterly diversion located in Business Center Drive and
private easements to the new Von Karmen Trunk Sewer. The sewer line must be
relocated by April 1988 in order to meet the airport's oonstruction schedule.
In order to expedite the necessary design and construction work, the County of
Orange prepared CEQA campliance documentation for the project. The County
retained Michael Brandoan Associates who have canpleted environmental analysis
and prepared a Negative Declaration which has been posted for public comment.
The negative declaration includes the future relocation of the MacArthur Trunk,
now called the South Airport Diversion Sewer which will divert flows easterly to
the Von Kamm Trunk via Camps Drive.
The impacts of the project are generally construction related, since the line is
within an existing street right-of-way and private easements adjacent to the San
Diego Freeway in building setbacks, and include excavation for construction, the
use of construction vehicles and equipment which may affect air quality, and
dewetering. Dewatering requirements will be mitigated by canpliance with the
Regional Water Quality Control Board permit. The greatest impact will be that
associated with disruption of traffic patterns. Mitigation measures include
providing directional signs and detour striping as approved by the District and
the City of Irvine. Existing services and utilities will be protected or
relocated.
pursuant to CEQA, the proposed Negative Declaration has been circulated and
posted. The public comment period closed on June 26, 1987.
The Orange County Transit District by letter dated June 22, 1987 cemented on
the proposed construction in Campus Drive (Contract No. 7-10-1) and requested
coordination of construction to insure lanes for bus service, which will be
incorporated into the specifications.
The actions appearing on the agenda are to receive this suumory and
oosideration of Resolution No. 87-95-7 approving the Negative Declaration and
authorizing filing of a Notice of Determination.
"Y" AGENDA ITEM #37(a) (1) - DISTRICT 7 "Y"
RESOLUTION NO. 87-93-7
APPROVING NEGATIVE DECLARATION RE NORTH
AIRPORT DIVERSION SEWER, CONTRACT NO. 7-10 ,
AND SOUTH AIRPORT DIVERSION SEWER, CONTRACT
NO. 7-10-1
A RESOLUTION OF THE BOARD OF DIRECTORS OF
COUNTY SANITATION DISTRICT NO. 7 OF ORANGE
COUNTY, CALIFORNIA, APPROVING A NEGATIVE
DECLARATION AND INCORPORATING CERTAIN
MITIGATION MEASURES RE NORTH AIRPORT DIVERSION
SEWER, CONTRACT NO. 7-10 AND SOUTH AIRPORT
DIVERSION SEWER, CONTRACT NO. 7-10-1, PROVIDING
FOR NOTICE THEREOF AND DIRECTING FILING OF A
NOTICE OF DETERMINATION
The Board of Directors of County Sanitation District No. 7
of Orange County, California,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. That the projects concerning which this
determination is made are described as follows:
Construction of a 18-inch gravity sewer in Business Center
Drive between Von Farman Avenue and MacArthur Boulevard;
and construction of future sewer between MacArthur
Boulevard and Von Farman Avenue in Campus Drive.
Section 2. That an Initial Study and Environmental Impact
Assessment, which said assessment is attached hereto as
Exhibit "A" , of the environmental effects of said projects have
been undertaken and completed by the District, and the results
thereof have been reviewed by this Board; and,
Section 3. That based on the findings of the Initial Study,
this Board determines that the proposed projects could have a
significant effect on the environment, but there will not be a
"Z-1" AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-1"
significant effect because of the mitigation measures described
within the Negative Declaration which is attached hereto as
\..
Exhibit "B" ; and,
Section 4. That said Negative Declaration has been
circulated for public review for a period from June 11, 1987 to
June 26, 1987, during which time the following comments were
received on the document:
A. Orange County Transit District, June 22, 1987
(Commented relative to maintaining lanes on
Campus Drive during construction. )
Section 5. That this Board hereby notes all comments
received on the North Airport Diversion Sewer and South Airport
Diversion Sewer Negative Declaration; and,
Section 6 . That, for reasons set forth in said Exhibit "A"
and in accordance with the mitigation measures incorporated in
Exhibit "B" and by this Resolution, it is hereby found that said
projects will not have a significant effect on the environment
and, therefore, the Board hereby approves the Negative
Declaration regarding the environmental impacts of said projects;
and,
Section 7. That the Secretary be, and is hereby,
authorized and directed to file a certified copy of this
resolution, the aforesaid Initial Study and Environmental Impact
Assessment and the Negative Declaration at the District' s office
to be available for public inspection and copying; and,
Section 8. That the Secretary be, and is hereby, authorized
"Z-2" AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-2"
and directed to file a Notice of Determination in accordance with
`.� the Guidelines Implementing the California Environmental Quality
Act of 1970, as amended.
PASSED AND ADOPTED at a regular meeting held July 8, 1987 .
"Z-3" AGENDA ITEM a37(a)(3) - DISTRICT 7 "Z-3"
COUNTY SANITATION DISTRICTS
FILED
In the office of the secretary EXHIBIT A 0 ORANGE COUNTY. CALIFORNIA
county Sanitation District
NO ' 10144 ELL16 AVENUE
F.O.BOX W127
JUN 10 1987 FOUNTAIN VALLEY.CAIIFOANA 997A�
014196&Nn
ENVIRONMENTAL IMPACT ASSESSMENT
Name of Project: NORTH AIRPORT DIVERSION SEWER, Cont. 7-10
SOUTH AIRPORT DIVERSION SEWER, Cont. 7-10-1
Location: North - in Business Center Drive and private
easements south and adjacent to 405 freeway;
South - in Campus Drive, both in the City of
IrvIry ne
Entity or Person Undertaking Project:
A. District: County Sanitation District No. 7 of
Orange County
B. Other:
Staff Determination;
The District' s staff , having undertaken and completed an
Initial Study of this project in accordance with Section 15063
of the Amendments to the California Environmental Quality Act,
for the purpose of ascertaining whether the proposed project
might have a significant effect on the environment, has reached
the following conclusion:
XX 1. The project will not have a significant long
term effect on the environment because of the
mitigation measures incorporated; therefore, a
Negative Declaration can be prepared.
2. The project could have a significant effect on
the environment; therefore, an EIR will be
required.
7
June 3 , 1987 C,�„L
Date J.' Wayne ylV4fter
/ Genera Manager
1e.✓
"Z-4" AGENDA ITEM #37(a) (3) - DISTRICT & "Z-4"
EXHIBIT B DATEP09TE0 June 12, 1987
DATE FINAL
COUNTY SANITATION DISTRICTS
..�„� OF ORANGE COUNTY, CALIFORNIA
P.O.BOX 8127.FOUNTAIN VALLEY.CALIFORNIA 92728.8127
10844 ELLIS.FOUNTAIN VALLEY,CALIFORNIA 92708.7018
(714) 962.2411
NEGATIVE DECLARATION
In accordance with the California Environmental quality Act, County Sanitation
District No. 7 of Orange County has conducted an Initial Study to determine whether
the following project may have a significant adverse effect on the environment and
on the basis of that study hereby finds:
Although the proposed project could have a significant adverse effect on the
environment, there will not be a significant adverse effect in this case because the
Mitigation Measures described on the reverse side of this sheet have been added to
the project. An Environmental Impact Report is not required.
The environmental documents which constitute the Initial Study and provide the basis
and reasons for this determination are attached and hereby made a part of this
document.
PROJECT:
North Airport Diversion Sewer (Contact No. 7-10) and
Title' South Airport Diversion Sewer (Contract No. 7-10-1) File No:
Location: John Wayne Airport, Orange County
Description: Rerouting of the South Irvine Subtrunk threw h a new sewer line easterly
along Business Center Drive to the Von Karman run ewer, an t e rerouting o t e
MacArthur Trunk Sewer to a new sewer line along Campus Drive to the Von Karman Trunk
Sewer. The existing lines will be decommissioned.
Lead Agency:County Sanitation District No.7 of orange County
Address: 10844 Ellis, Fountain Valley, California 92708-7018
Contact Person: Project: Thomas M. Dawes Telephone: (714) 962-2411
Environmental: Thomas M. Dawes Telephone: (714) 962-2411
NOTICE:
This document and supporting attachments are provided for review by the general public. This is an information
document about environmental effects only.Supplemental information is on file and maybe reviewed in the office
listed above. The decision-making body wilt review this document and potentially many other sources of infor—
mation before considering the proposed project.
This Negative Declaration may become final unless written comments or an appeal is received by the office
listed above by 4:30 p.m. on June 26. 1987 . If you wish to appeal the
appropriateness or adequacy of this document, address your written comments to our finding that the project will
not have a significant adverse effect on the environment: (1) identity the environmental etfect(s), why they would
occur,and why they would be significant,and(2)suggest any mitigation measures which you believe would eliminate
or reduce the effect to an acceptable level.Regarding item(1)above,explain the basis for your comments and submit
any supporting data or references.
"Z-� AGENDA ITEM #37(2)(3) - DISTRICT 7 "Z-5„
Project Title: Airport Sewer DlversiG
COUNTY SANITATION DISTRICTS
OF ORANGE COUNTY, CALIFORNIA
+'' _• P.O.BOX 8127. FOUNTAIN VALLEY. CALIFORNIA 92728-8127
1085A ELLIS.FOUNTAIN VALLEY. CALIFORNIA 02708-7018
(714) 9e2-2411
Pursuant to the California Environmental Quality Act of 1970, the following environmental analysis
was prepared to determine whether the project may have a significant effect on the environment.
]. smOw - NxV.SCC mman mOm? IN ITS NMRZ NO W. OxBL9AR:t xPIO SORQCE YATQ9. M HIM q
OR S ArI6Tm [T, OR IN NIT ALSCMTLDN OT VMROC
NARK L W' M=m NOT IOT
A. aATNST - B➢IISCD P 7TM mRhRtr DIMOLVED v
ORTOMr OR WAR. T 1
]) IN ONOT G MRRIFY. GTmm6R oA IN y —
CaN1OC] R aOiC 90ofS16CNRC5T y F. A MTIOR OT MOWMNMI1 OR
W
AATt OT TIQI OT GIQJIO NATLMI
x) NO=IC 0T ]W SO OR 9R9PCRT
TO OW, .-W, COO M R, O. . IRR R WAT U, IRTN O N
swam, LN09LIOG9. 1699LID79r ISM DT MOM MATLR9r QRO RA]IIGN
CROIY TAIItRCr OR J➢IIUN CAGPLT X DIRO_T AWITIONB DR NOr M NAL9r OR
RROO ON}Z=L TII 7 Lx AQlITQ
B. rARDI➢w ALTNSIa m WTB OR «,..vArtmn7 X
1] OWCE IN A{?,MPR 0II OBWrq B. SRO5O86 Or ROrLi OR PROPCR[T —
8Mh:z MI.IR rMTOMI? X W NATDPR = MINOR MOON M
•ILODM M TIML NAVM] X
21 THE DIOMI T10N, meQ , OR
IWinam" OR AVT =on OW== a. DIOi➢OIOL NEOCKIRm - na M
OR TQBICM TPPWST X MWML MOLT IN,
C. QAVCt9 IN OpO$f21O ON EdBIO A. CW= IN RL➢NISI= W SRC-
OT 9TJ1O S.WDS, OR CSWaW IN FILTH CIW' ORNOC OR OC=OMnOW Or
SIGN, DM51SION OR MR=MOM TNM AND TROIN RABISAS. C IN
MY MOIR WE CtVMR W A RI UI OR Rt N0®CR Or ANT SPECITB W DWRB
RTNLRN O RC =OT IBC MW OR OR MrNAfd. ➢RAOpJCTION OT NOI
ANT MT, IMiT OR GRL) X 8MIW Or T4VRa OR AVZXALT INM NI
ARM. OR IRfAOdICflON W A BNIRITR
]. MIR-NI4 RB TIgIOBV. RQ➢LT IN. W INZMIGRATION M R ItZHII IONORT OR X
MNO
SMI
A. MMA9ID AIR MI58IM OR DIM!
-
—
MOMTIO O Xg2dS A]R (IOUXIx B. AtttCTtox Ol RL M�9 Or ARr
MOII TROIRTSON BY IN SOUR WART Mon. MSrBMCM4I n=FICANT,
AIR QDTASR WRaz ONT TLW. X AWB OR l7mMOQW SmIB OT IWOMI
O AWLYLS} X
B. LM0501¢ Or RCRS'A9 A ==Y —
IIiVATtD X
LNCLS or AIR WIIDROT ]. OLMRLL/BCID M R6WRD -
W=RL TW WSN. RTSOLT IN .W
C. M C 7`109 OT OL7GSIONABLt ALSCIW,TIM O A BIOMTICIWT ARCEM
OWM> X OICaICAL O .,,=MCAL SM. 8S01C-
IM, OO ' O WIMM, IN
0. MITZRASIO O MR IO4L@tT, M=;1M 51R, OR O®. INWMNIr
ROIMC ON TDI3ALTORB. OR =MRMW9C1E1SI !RC M!XOR _ x
CBNIOL IN CLiMARt. IISNTR =ALLY
'WRcINT ro vMICT) OR RcxO!ucLS .� a. ARSIeErtd - NIM m TWwsu. y
IQ NMT)> RLWLT IN Rt OMTINf.TIO M
DC91LC VISTA O WIN COW W WE
]. BE—- NIIS RL TNWSAI DOLT 9 ELIC. O NILL IBC MOWML RS➢I.T
IN RN CWATIO 01 M ARSIMICAILT
A. CCMCIS INCOMEVS9. OR M O Srw SIR Om M WKIC VIM X
CWA9C ON OIR6RfO W NAS[N NOVC t
7. �T -
NLIS]r IN NOR NMIM OR TM.SC HILL RC rWWBV.
X
.MRNS? RL,N LS IN.
D. CBWCO IN A[9Mmrm RATLT, A. OR Or A@DR1NiS MQ NOONI9
➢MIMOC RAT ' CI MOM O RC OT MR& OR ENC 7 X
MR NOI NCONT W SMhCz YATLR
ROIOIh X B. xMNATC DOORD MON QImm
SCOW. Or WzRot, OR RWOru RC
a MR IRRD9C ill NIID oR NATCII ODVCIONIDIT or M SAZ'6 Or
RRM. Dr BOIm. II OR ONOa .7 X
err-exm — — -
- a. NOCI UNIX - WILL M RW W W.
O. aBWee I11 TBe NCOR} O BORTAO RE=V7 IN,
WARR IN Nrt WAM War? X
— A. WNTLICT rIR TPirNG ON
➢LVI DCSIOPT]ON/WISCfCS MR
Wt RC y
MPLMYT x
r'Z-6" AGENDA ITEM #37(e)(3) - DISTRICT 7
B. mnl.:cr rxxe flvrearr, axs}- in OiQ Ro V. Dea fee Pm,sr Puef PAawr ra wra +o
M, Of HA1Yd LAND OQf, .� OR MMORS s7RMvr92M0 Bax. M
Ran m OR..TO WRIC OR RMIO-
C. ISOR'm@.T y OIpJP dw". MT[VC ORO, Emplosims OR IIDOL]AIAL
MIliam W[NAnOP YO RALM. r[m x
arum Prormm calm I.R4d] x
— — L, mDM TSE PM105AL IPIGPae
�/ 0. rII.i 41mipALL Re90L] IP DDLA reID AR lAX7Y R61YSla PJN OII
LIOR or vAUAeG ADRILALfOwL LAND
w evAnAnw mR7 - — — x
n DevamTmrrl X
P. RAM ILL PRVQT Da M URLE
M RfS RAPo.W. PASI➢06 QSOaL OL H As w m QLimAf MTaI.V9
]06Wif3 LiL1,CCSPR X OR'9 M nvu 596tTNCa. fGMfABLL
OR aAGeiv15] x
B. SfARSin N'TPROMSAL RELVIQ M. 10116 - RG. Tffi PMMOL R6pLS
nu m PrmMw. RESOGT al Ixr
a. mlaAnOP OT Ammomm.]QIc} A. xtLRzxsz O, QxsrslA coin
GA ROvmmr, QTd[I mcrRm.A.VALTat$. x ALPLIS, x
1. 27MCM OR QIBTA SRRXIM L. Qi090AL Or 9m1A.6 n WISC
fKI1SnQr 0A . MR @[ LLV[Lq IP QCCSO Or ROPn
X BrANDAmn x
C. DmKT aWp ax9]IRo RATE P4plm 13. LxGEC Alm COMM- WILL ME PIOW W. —
SMV9W¢IAn011 aflAl[) x PMOIOC I WORT OR QLRM? X
0. Min otaoR PAnLAPL OL CMOU-
GnOP OR MOVm@iT M PC1R6 Alm/OA 11. "ll, QfIPICB Alm RILSTSQ -
OmASI x RILL Ifi. PMIWSV.CWA]L M. .
MR AL/ CACILInQ OR ME ZRIMSTW.
!. arQ vMT;MA2. RAIL, OR MR Or ai.mm CMSLIrIQ OBICL Y
]URIC] OR"MO RM C PaUm IRPACT, x
f. MM7TC LALVOS TO LOOaSRIAL4. A. ai¢PWECfIOP x
IoIOR VaIR.a" mcr= 9r OR P B. TWICE: P.C]1SS10p X
=15l'SANS, X L C. CAOSIOR OR Im2mm CMOVIMIOR 4 SCHOOLS — — x
P'ORCL"Rl — — x B. PAAt9 Alm DOIA1 RSAGrIOP
IB. ins_ IIII.l,ME PREMIX, ]MILInQ — — x
R[SOLT IP AN SMOOT uma ME ODALIV
011 OvA " Or alma ALCL- O'PL L. IOIPA DL Q'IpaL CA9 —
DPIORANITfa, x P. OOmFICATIONS SCSRLS x
U. ROV.IC LOtre ARn LAR T -RILL
in PROM", e. YASLII x
A. RWLR SAC as or eiROSIOP RATE E. Srlta OR =ITIc TANK$ x WE AGSATE m SaAagJs 90CRANC6. I. STORK VUER OOIRML x
IPCICG DO OIL, PESfxCMa C, E41C.,OR RMIA1 IN in COL!]m AN x a. SOLM N.IRE APO nxSMsw x
A¢IOpr OR Ovsa mmmars,B. aMa PaaRKS OR PROPERTY TO K. meet mwcm — — x
rLDGND FIRE QIAAOS] — — —X 1S. Otsa oa®aa
C. PwM ,ReVILOs va m Re
m`ERTr aMSC MRSCRE YW !OS Olffi A".mRTS Hm FT]Am6 ®LSso,
OCOVPt ME SITE n HAZARDOUS SQ-
STAMM' IKIAJSAO Wr ROT LIRPIL)
TO OIL, ] inns 9. MOKWALB OR X
,JIOIMMM
A. O)O ME ,.. wve ME mrnr.n ¢Owe[ ME CALITT O, T Z CWT.. IImSn°I[ALLT N5 �°X
_rr ME NV mr Of, ..OR RLL4[rC XPRAnm M OIN "R SRL, .m LNLI.f. TR41d
f0 LLIRw1L , eGRr OR W[w4 D ZTT. RII,RL T6...OR 16}AR in 1A14e a , R n
pmMQY[0 fGM W1 QIRLL OR 0'.. nQOPIAN[ 6NP10 Cr Tm R[OR rto. A QL Z.
Rf ARt OL 'RO SARn
D]a M 1d .Tm MMOrR.M Aml[M s1101R-TCM. TO Ta 0[fIA'ARAQ O LLMiRPI.
FINDINGS: ° WIIOIIOIR,L 00Ae, 1, [ROIr-ITW w.n RATE M WtRRPm.r m mR W[R o0aa I. , RG}rvar
LRII1. OCrIMISNL Im.Or 11R WZLO IdFteM mOAOTf .ILL .OR KLL DOO Tr6 RLaRC.I
C. IW M IMSEM wvt DORL79 WIOR AI@ MRrIPPLLT LIRIM. LL�MR.L1.Rr61... IA � X
I.wl 19,R OI M OR w4 fQAYSL 16mR9 M6R M IpLLT d Gq ®OYR2 [f
R wS. 9rA1J., M.. M arraOi Or. MLL> Man WRRf O[TQ LNIIOORYT m
[IGRIGNT.1
0. . Tm PMJ.wVL aIItlOL1lAL Lr°RTf T. RG DIAL EaM RRIK APTRC ArRTE ml X
R>.R enlN.v, ItM.DIRRL,0R not Aran."
w M wrL or RIs . ' . aALwna.
I rfi0 M °Ra6m PIOI RT mOfL 19[ wvC 1 sva.", R}CIKT W M. mNl A00,T. uL1,aCV Nt
O M,lm,RILL LC PRIAR[m.
`... DETERMINATION: X 1 1.Tw]MTwal M 1.0 0 I.E,,N O w C ,s[alrlC °mG°0.M Wlo mT. MR Ru
011 Q A Ralna.r erMOr 1.Rn a[.erauR M RRlur[a RuuIQ fLs<ReeB a u,rTLao smar
wR em ALoee n M I... A Ru1N! oea..0. nu R! rv,Rm.
1 11"ME IMMS D 1N wT wR A flmmrlOM LrTTC1 O M CM'IR] * AM AR WIQCCVTAL M0
RQ04 [f RWtI®.
BE DY.'
'Z-7" AGENDA ITEM #37(a)(3).__ DISTRILLJ_ — . _ ""Z-7"
Project Proposal and Background
The proposed project involves the abandonment of the South Irvine Subtrunk Sewer
(extension of Michelson Drive Subtrunk Sewer) and the portion of the MacArthur
Trunk Sewer, westerly of MacArthur Boulevard; and Redirection of Flows to the
North Airport Diversion Sewer (Contract No. 7-10) and South Airport Diversion
Sewer (Contract No. 7-10-1).
Project Background -
Both lines are presently located within the John Wayne Airport (JWA) property
boundaries. These lines service JWA and the area west from Von Karmen Avenue
and Birch Street to MacArthur Boulevard and Campus Drive. Currently, both trunk
lines are intercepted downstream by the Gisler-Redhill 'hunk Sewer. The South
Irvine Subtrunk and MacArthur Trunk sewers are both owned by the County
Sanitation District No. 7 of Orange County.
The approved Consolidated Master Plan of Trunk Sewer Facilities for the County
Sanitation Districts depicts sewer flows from the MacArthur Trunk and South Irvine
Subtrunk to be redirected from their confluence with the Gisler-Redhill Trunk to the
Main Street Pump Station. The rerouting of these flows is to provide relief to the
Gisler-Redhill Trunk.
On February 26, 1985, the Orange County Board of Supervisors adopted the Master
Improvement Plan for JWA. The JWA Master Plan proposes the construction of a
terminal building and parking structure directly above the existing South Irvine
Subtrunk easement, thereby precluding service access to the trunk line. JWA has
requested the County Sanitation District relocate the South Irvine Subtrunk sewer
prior to the initiation of construction of the terminal and parking structure.
The County Sanitation Districts have agreed with JWA's request. Additionally, the
Districts are interested in relocating the MacArthur Trunk Sewer that runs dia-
gonally across the JWA property because of the difficulty associated with servicing.
Therefore, the relocation of the sewer lines off of the JWA property is being treated
as one project, although possibly separated into two separate construction efforts.
-1-
"Z-8" AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-8"
Project Analysis
The 1982 Consolidated Master Plan of Trunk Sewers Facilities, as amended, proposes
the rerouting of the South Irvine Subtrunk Sewer northerly and westerly along the
south side of the San Diego Freeway. The MacArthur Trunk Sewer would remain live
across the airport to their confluence where the proposed master sewer would cross
the freeway and convey the combined flows to the Main Street Pump Station.
However, the proposed project provides a less costly route and would not require a
new crossing of the San Diego Freeway.
The MacArthur Trunk flows would be rerouted through a new sewer line along
Campus Drive, and discharging into the existing Von Karmen Trunk at Von Karmen
Avenue. From the Von Kerman Trunk, rerouted flows will travel north to intercept
with the Main Street Trunk, and then proceed west toward the Main Street Pump
Station (see attached exhibit).
The South Irvine Subtrunk flows would be rerouted through a new sewer line easterly
along Business Center Drive, then extending by easements through two privately
owned parcels to an existing manhole on the Von Karmen Trunk Sewer. From the
Von Kerman Trunk, rerouted flows will travel north and intercept with the Main
Street Subtrunk, and then proceed west toward the Main Street Pump Station. The
proposed South Irvine Subtrunk route will require easements through the Irvine
Company and Parker-Hannifin Corporation property. However, both easements will
be along existing parking areas or landscaped portions of existing parking areas. The
required easements will not eliminate any parking spaces or permanently disrupt
existing circulation patterns.
The abandonment of the MacArthur Sewer involves the construction of a sewer line
from the Von Kerman Trunk Sewer, located at Von Karmen Avenue and Campus
Drive, westerly to the existing airport service facilities, intercepting existing ser-
vices and City of Newport Beach, and County of Orange service connections without
interruption. The existing MacArthur Trunk Sewer will bne decommissioned and the
existing Campus Subtrunk Sewer will be abandoned.
-2-
"Z-9" AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-9"
The proposed relocation of the MacArthur Trunk and South Irvine Subtrunk will not
alter present or proposed service capacities. The existing MacArthur Trunk line and
South Irvine Subtrunk line will remain underground in an idle state except for
providing sewer servicing capacities to the airport terminal. Relocation of the South
Irvine Subtrunk Sewer is anticipated to be initiated in 1957. The MacArthur Trunk
Sewer will be relocated in approximately 3 to 5 years.
-3-
"Z-10" AGENDA ITEM #37(a) (3) - DISTRICT 7
J f
0
Vi tPF,tt P t SSP
P ee• •Y
i
tPPPP tPg6
EPx WEW 1
18• f
A �
y, I Pt
6P
ryJ'Cvt ASANDONV
F t`PO w;22'' (ALTERNATE
.�`4`SPeJ4�t y a ONLY)
aPy6
wnmf
P \o t 8
e Pp
gp a M1t Af
n.
pt�pP' Q f LTE TE
E OM SI A
\gP\O \
0 .r.� eJ5 pP
c 1x
a o0
J PPt
P
E F`tP
• b
3 UP ZP
Swrce: County Sanitation Oletrl L'te L"ond
of Orenge County.
PROPOSED SEWER
Relocation of MacArthur Trunk EJE%ISTINO SEWER LINES
.r and South Irvine Subtrunk
John Wayne Airport VN
Orange County
"Z-111r AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-111'
ENVIRONMENTAL CHECKLIST EXPLANATIONS
The following is an analysis of the project's environmental impacts, as indicated on
the attached environmental analysis checklist. An explanation of the impact deter-
mination is provided for each analysis topic. If a potential impact has been
identified, a mitigation measure that reduces the impact to a level of no significance
is provided.
1. Earth Resources - Explanation
Implementation of the proposed project will require limited grading and
landform alteration. The proposed trunk routes are located within areas that
are presently developed; therefore, no significant earth resource impacts are
associated with the project.
2.b Air Explanation
The proposed project will not generate any additional air emissions that will
reduce the level of air quality within the project area. The use of construction
vehicles and equipment may affect ambient air quality, however these impacts
are not anticipated to be significant.
3.b.c Water Explanation
The project area is presently developed. Therefore, no long-term impacts are
anticipated. The existing drainage system may experience minor disruption
during construction, but. the level of disruption is not expected to be signifi-
cant. Dewatering devices may be employed during construction of the _
proposed facilities. Water from dewatering activities may be discharged to the
existing flood control system.
Mitigation
Any dewatering required during construction will comply with the California
Water Quality Control Hoard standards.
1
°Z-12" AGENDA ITEM '#37(a) (3) - DISTRICT 7 "Z-12"
4. Biological Resources Explanation
The proposed project involves the placement of sewer trunk lines under existing
paved roadway surfaces or landscaped medians. There are no significant bio-
logical resource impacts.
5. Cultural/Scientific Resources Explanation
The proposed trunk routes will be located within areas that are presently
developed. Because of the disturbed nature of the route locations and limited
surface grading, the probability of discovery of cultural resources is small.
Should cultural resources be discovered during construction, a qualified
archaeologist/paleontologist shall be notified and site-specific mitigation
measures be developed and implemented as appropriate.
6. Aesthetics Explanation
The proposed project involves the placement of sewer trunk lines under existing
paved roadway surfaces or landscaped medians. There are no aesthetic impacts
associated with the project. All removed landscaping during project con-
struction shall be replaced.
7. Energy Explanation
Implementation of the proposed project will not result in any significant
impacts on existing energy sources or create additional demand for energy use.
8. Land Use Explanation
The proposed trunk lines will be constructed under existing highways. Imple-
mentation of the project will not have any significant land use impacts. The
proposed South Irvine Subtrunk route will require easements through The Irvine
Company and Parker Hannifin Corporation property. However, both easements
will be along existing parking areas or landscaped portions of parking areas.
The required easements will not eliminate any parking spaces or permanently
disrupt existing circulation patterns.
2
"Z-13" AGENDA ITEM #37(e) (3) - DISTRICT 7
9. Transportation/Circulation Explanation
Construction impacts associated with the proposed project will result in the
temporary disruption of present circulation patterns.
Mitigation
Provisions for a safe and continuous passage of local pedestrian and vehicular
traffic at all times will be made. Prior to the commencement of work a traffic
control plan shall be submitted to and approved by the City of Irvine. The traf-
fic control plan shall include measures such as:
A. The erecting and maintaining of signing, striping,barricades, temporary
signals and other safety measures as directed by the city engineer.
B. The covering of existing signing not in conformance with the detour-plans
for the duration of the detour.
C. The relocation of existing stop signs to provide visibility from all relocated
traffic lanes.
D. The replacement of delineators with barricades equipped with lighting
devices at construction areas where an open trench exists and/or where
traffic detour will be in existence during night hours.
E. Conformance with the guidelines in the Work Area Traffic Control
Handbook (WATCH).
F. Notification to properties adjoining the construction area in compliance
with the City of Irvine standards, if normal access is to be restricted. The
notice should include the nature and duration of the restriction.
All existing facilities, including signing, striping, signs, markings and markers shall
be restored to the original condition and/or location at the end of the construction
period.
10. Recreation Explanation
The proposed trunk lines will be constructed under existing highways offering
no recreational opportunities. Implementation of the project will not have sig-
nificant impacts on recreation.
3
"Z-14" AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-14"
11. Public Health and Safety Explanation
The proposed project is not associated with hazardous substances. Therefore,
implementation of the project will not have any significant public health and
safety impacts.
12. Noise Explanation
Construction-related impacts will include a temporary increase in existing
ambient noise levels. However, the increase in noise levels will be in areas
located away from noise-sensitive land uses (i.e. residential) and will not be
significant.
13. Light and Glare Explanation
The proposed project may require onsite lighting if night construction is neces-
sary. This additional light and glare will be short-term, during construction
only. No sensitive uses (e.g., residential) are in close proximity to the project
area; therefore no impacts are anticipated.
14. Public Services and Utilities Explanation
The proposed relocation of the MacArthur Trunk and South Irvine Subtrunk will
reroute existing sewage flows to the Von Kerman Trunk Sewer, thus providing
needed relief to the Gisler-Redhill Trunk Sewer. The proposed relocations will
not impact existing service capacities. County Sanitation District No. 7 of
Orange County's 1982 Consolidated Master Plan of Trunk Sewer Facilities, as
amended, depicts the South Irvine Subtrunk Sewer being rerouted northerly and
westerly along the south side of the San Diego Freeway, to be joined by the
MacArthur Trunk Sewer, and cross under the freeway to the Plain Street Pump
Station. The proposed project is a change in routing from what is shown in the
District's master plan.
�.d
4
"Z-15" AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-15"
Mitigation
The Consolidated Master Plan of Trunk Sewer Facilities should be amended to
reflect the proposed rerouting of the facilities to the Main Street Pump
Station. No significant impacts are anticipated from the proposed modification
to the master plan.
5
"Z-16" AGENDA ITEM #37(a) (3) - DISTRICT 7 "Z-16"
RESOLUTION NO. 87-94-7
APPROVING PROJECT RE CONTRACT' NO. 7-10
AND AUTHORIZING GENERAL MANAGER TO AWARD
SAID CONTRACT WITH CONCURRENCE OF DISTRICT
CHAIRMAN
A RESOLUTION OF THE BOARD OF DIRECTORS OF
COUNTY SANITATION DISTRICT NO. 7 OF ORANGE
COUNTY, CAL4tlRNIA, APPROVING THE PROJFX.T
FOR CONSTRUCTION OF THE NORTH AIRPORT
DIVERSION SEPM, CONTRACT NO. 7-10; AND
AUTHORIZING THE GENERAL MANAGER TO AWARD
SAID CWTRACT WITH THE CONCURRENCE OF THE
CHAIRMAN OF THE DISTRICT
x x x x x x x x x x x x x x
WHEREAS, the proposed project for construction of the North Airport
Diversion Seder, Contract No. 7-10, is included in Amendment No. 4 to the
previously-approved Consolidated Master Plan of Trunk Sewer Facilities to Serve
District No. 1, the Northern Half of District No. 6 and District No. 7, which
said Aendmnent No. 4 was approved by the Board of Directors of District No. 7 on
June 10, 1987, in order to comply with the County of Orange order to relocate
said facilities to accommodate proposed improvements to the County's John Wayne
Airport; and,
WHEREAS, in accordance with the Districts' Guidelines Implementing the
California Environmental Quality Act of 1970, as amended, the District has
undertaken an environmental review of the proposed project for construction of
the North Airport Diversion Sewer, Contract No. 7-10; and the Board of Directors
on July 8, 1987, approved a Negative Declaration for Abandonment of South Irvine
Subtrunk (Extension of Michelson Drive Subtrunk Sewer) and MacArthur Trunk
Sewer; and Redirection of Flows to North Airport Diversion Sewer (Contract
No. 7-10), and the South Airport Diversion Sewer (Contract No. 7-10-1); and,
WHEREAS, plans and specifications for construction of the North Airport
"AA-1" AGENDA ITEM #37(b) - DISTRICT 7 "AA-1"
Diversion Sewer, Contract No. 7-10, were approved by the Hoard ofDirectors by
Resolution No. 87-59-7 on June 10, 1987, and the Secretary was authorized to
advertise and receive bids for said work.
NOW, THEREFORE, the Hoard of Directors of County Sanitation District No. 7
of Orange County, California,
DOES HEREBY RESOLVE, DEPEREffiE AND ORDER.
Section 1. That the project for construction of the North Airport
Diversion Sewer, Contract No. 7-10, is hereby approved, and that the Beard
Secretary be directed to file any docwrents required by said Guidelines
1uplementing the EYnvironnental Quality Act of 1970, as amended; and,
Section 2. That upon opening of public bids, the General Manager is
hereby authorized, with the concurrence of the Chairman of the District, to
award a contract for construction of the North Airport Diversion Sewer, Contract
No. 7-10, to the lowest responsible bidder, and to reject all other bids for
said work; and,
Section 3. That the Chairnan and Secretary of the District are hereby
authorized and directed to enter into and sign a contract with said law bidder,
pursuant to the specifications and contract documents therefor, in form approved
by the General Counsel.
PASSED AND ADOPTED at a regular meeting held July 8, 1987.
"AA-2" AGENDA ITEM #37(b) - DISTRICT 7 "AA-2^
.r COUNTY SANITATION
DISTRICTS NOS. 11 22 3, 52 6, 7, 11, 13 AND 14
OF
ORANGE COUNTY, CALIFORNIA
MINUTES OF THE REGULAR MEETING
ON
JUNE 10, 1987
PT1lTATIO V
0«o'*lit. 0ro° .119��i .
iv ro%3
i'
rweo 1994
ADMINISTRATIVE OFFICES
10844 ELW3 AVENUE
FOUNTAIN VALLEY, CALIFORNIA
ROLL CALL
A regular meeting of the Boards of Directors of County Sanitation Districts Kos. 1, 2, 3, 5,
6, 7, 11, 13 and 14 of Orange County, California, was held on June 10, 1987, at 7:30 p.m., in the
Districts- Administrative Offices. Follovi:g the Pledge of Allegiance and invocation the roll
was called and the Secretary reported a quonnn present for Districts Nos. 1, 2, 3, 5, 6, 7, 11,
13 and 14 as folly :
..
ACTIVE DIRFX.`lORS - ALTERNATE DIAFS.'NRS
DISTRICT NO. 1• x Ronald B. Hoesterey, Chairmen Richard B. Edgar
Robert
x Hanson, Chairman pro ton Orna Crank
x Dan Griset Dan Young
x Roger Stanton Don Roth
DISTRICT MD. 2: a Buck Gatlin, Chairman Chris Norby
x William D. Mahoney, Chairmen pro tem _Dorothy Wedel
x Ben Bay _Iry Pickier
—x—Roland E. Bigpger Irwin Fried
x Dan Griset Dan Young
X Gene A. L.eyton Garrey Nelson
x James Neal George Scott
x Arthur G. Newton Carol Davney
x Bob Perry Gorman (driver
_ x Wayne Silzel James T. Pasbender
x Don Smith Jess Perez
_Roger Stanton _Don Roth
DISTRICT NO. 3: x Richard Polis, Chairmen _Larry Herman
x Sal Sapien, Chairman Pro ter Martha Weishaupt
_E__Ben Bay _Iry Pickler
a Buck Catlin Chris Norby
Prank Clift X Joyce Risner
xNoroen Culver Bob Perry
x Don Griffin Rhoda J. McCune
X Dan Griset g_Dan You
X John Kanel Cornelius M. Coronado
=Jack Kelly Grace Winchell
x William D. Mahoney Dorothy Wedel
x James Neal George Scott
x Carney Nelson John H. Sutton
x J.A. "Bob" Siefen Dewey Wiles
x D Roger Stanton on Roth
x Charles Sylvia Paul Bernal
DISTRICT NO. 5: x Evelyn Hart, Chairman John C. Cox, Jr.
x John C. Cox, Jr., Chairman pro ten Ruthelyn Plt mer
Du
n an Roth Roger Stanton
DISMCT NO. 6. x James Wahnner, Chairman Eric C. Johnson
x Philip Maurer, Chairman Pro ter Ruthelyn Plomer
x Don Roth Roger Stanton
DISTRICT NO. 7: x Richard Edgar, chairman Ursula Kennedy
a Sally Anne Miller, Chairman pro ten Iarry Agran
x John C. Cox, Jr. Authelyn Plumer
-7—Dan Griset Jan Young
x Don Roth Rogec Stanton
x Don Smith Jess Perez
x James Wahner _Harry Green
DISTRICT NO. 11: x Jack Kelly, Chairman Grace Winchell
x dtm Mays, Chairman pro ter Peter Green
x Roger Stanton _Don Roth
DISTRICT NO. 13: x John H. Sutton, Chairman Carney Nelson
x J. Todd Murphy, Chairman pro tem _Roland E. Bigoger
x Bea Bay Iry Pickler
-x-Don Roth Roger Stanton
x Don Smith Jess Perez
DISTRICT NO. 14: a Sally Anne Miller, Chairman _Larry Pgran
Peer A. Shen, Chairman pro tem x Darryl Miller
_
x Ursula Kennedy Richard B. Edgar
x Don Roth _Roger Stanton
x Don Smith Jess Perez
-2-
06/10/87 '
STAFF MEMBERS PRESENT: J. Wayne Sylvester, General Manager, Rita
Brown, Board Secretary, Thomas M. Dawns,
Blake Anderson, Bill Butler, Penny Kyle,
Hilary Baker, Rich von Langen, Gary Streed,
Corinne Clawson, John Linder, Chuck Winsor, �...�
Bob Goten, Mike Deblieux, Judy Bucher, Ed
Hodges
OTHERS PRESENT: Thomas L. Woodruff, General Counsel,
Suzanne Atkins, Walt Howard, Phil Stone,
Joe Hartge, Dan Spradlin, Don Crapnell
x x x x x x x x x x x x x
DISTRICT 14 Moved, seconded and duly carried:
Appointment of Chairman pro tam
- That Director Ursula Kennedy be
appointed Chairman pro tom in the absence of Chairmen Sally Anne Miller and
Chairman pro tem Peer A. Swan.
ALL DISTRICTS The Joint Chairman reported on the
Report of the Joint Chairman California Association of Sanitation
Agencies' (CASA) Workshop held in Lake
Tahoe in May which he attended along with District Chairmen Ron Hoesterey, Dick
Edgar, Evelyn Bart and Jim Wahner, and the General Manager and General Counsel.
He noted that the success of CASA's efforts is largely due to their hard working
committees that address the many issues that the Districts' Boards of Directors
face on a day-today basis such as air and water quality matters, sludge disposal,
hazardous and toxic waste issues, and legislative and regulatory matters. As a
result, the CASA workshops and committee meetings are quite informative and
helpful.
Mr. Griffin announced that the national Association of Metropolitan Sewerage
Agencies (AMSA), which focuses its attention at the federal level, recently held
their annual meeting and that the Districts' General Manager, Wayne Sylvester,
had been re-elected to AMSA's Board of Directors.
For the new Directors' information, the Joint Chairman also advised that the
General Manager is a past president of CASA. In addition, he currently serves on
Tri-Tac, which is a technical advisory comnittee to the State Water Resources _
Control Board, and is Tri-Tac's immediate past Chairman. Tri-Tac is comprised of
representatives form CASA as well as the California Water pollution Control
Association and the League of California Cities.
Chairman Griffin then reported that the Building Cmmittee was scheduled to meet
on Thursday, June 18th, at 5:30 p.m.
The Joint Chairmen called a meeting of the Executive Committee for Wednesday,
June 24th, at 5:30 p.m., and invited Directors Carrey Nelson and Arthur Newton to
attend and participate in the discussions.
Chairman Griffin advised that due to a scheduling conflict, the Select Cammittee
to Advise the Staff, which was to meet on Thursday, June 25th, at 5:30 p.m.,
would be rescheduled to a date to be determined after contacting the Committee
members.
-3-
06/10/87
ALL DISTRICTS The General Manager reviewed the
Report of the General Manager Districts' procedures relative to
approval of the annual budgets for each
District.
The Joint Operating and Capital Outlay Revolving Fund Budgetsm considered in June
by the Boards, fix the requirements for the construction and operation of the
joint treatment facilities, and the activities of the joint administrative
organization. Upon adoption, each District's respective share of the joint works
budgets are then incorporated into the individual District's budgets which became
the official budgets. These budgets are considered on an individual District
basis and would be presented to each District Board at the July Board meeting.
ALL DISTRICTS The General Counsel reported that an
Report of the General Counsel agreement for purchase of nitrogen
oxides (NOx) air emission credits, as
previously authorized by the Boards in connection with the proposed Central Pones
Generation Systems to canply withy SCAQMD Rule 1110.1, had been fully executed.
Negotiations for an agreement for purchase of non-methane hydrocarbons (NMHC) air
emission credits are nearing completion. It is anticipated that an agreement will
be ready for execution in the near future.
Mr. Wbodruff briefly reported on three items of legislation pertaining to the
ability to charge capital fees to public agencies for sewer capacity which would
override the San Marcos case, grant auditing procedures, and proposed
requirements affecting use of digester gas as a fuel. Be added that the League
of Cities, the California Association of Sanitation Agencies and the Association
of California Water Agencies had put a lot of tine and effort into the San Marcos
legislation over the past several years. Based on the hearing recently held by
the Governmental Organization and Local Government Cmmittees on June 9th, this
bill is effectively dead. The General Counsel advised that he would keep the
Directors apprised of the status of these items of legislation.
DISTRICT 1 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, the Chairmen ordered
that said minutes be deemed approved, as mailed.
DISTRICT 2 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meting
held May 13, 1987, the Chairman ordered
that said minutes be denied approved, as mailed.
DISTRICT 3 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, and the adjourned
meeting held May 20, 1987, the Chairman ordered that said minutes be deemed
approved, as nailed.
DISTRICT 5 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, the Chairmen ordered
that said minutes be deemed approved, as mailed.
"✓ -4-
06/10/87
DISTRICT 6 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, the Chairman ordered
that said minutes be deemed approved, as mailed.
DISTRICT 7 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, the Chairman ordered
that said minutes be deemed approved, as mailed.
DISTRICT 11 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, the Chairman ordered
that said minutes be deered approved, as mailed.
DISTRICT 13 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, the Chairman ordered
that said minutes be deemed approved, as mailed.
DISTRICT 14 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held May 13, 1987, the Chairman ordered
that said minutes be deemed approved, as mailed.
ALL DISTRICTS Moved, seconded and duly carried:
Ratification of payment of Joint
and Individual District Claims That payment of Joint and individual
District claims set forth on pages "A" and
"B" attached hereto and made a part of these minutes, and snmmarizel below, be,
and are hereby, ratified by the respective Boards in the amounts so indicated.
05 13 87 05 27/87
ALL DISTRICTS
Joint Operating Fund - $ 458,763.27 $ 640,933.26
Capital Outlay Revolving Fund - 139,015.28 755,722.43
Joint Working Capital Fled - 62,038.87 78,410.23
Self-Funded Insurance Funds - 10,646.29 2,148.96
DISTRICT NO. 1 - 425.00 270.30
DISTRICT NO. 2 - 22,651.79 20,183.65
DISTRICT NO. 3 - 1,277.44 12,816.69
DISTRICT NO. 5 - 8,507.00 12,836.96
DISTRICT NO. 6 - 2,386.14 -0-
DISTRICT NO. 7 - 24,357.10 1,192.61
DISTRICT NO. 11 - 9,818.07 4,406.64
DISTRICT NO. 13 - -0- -0-
DISTRICT NO. 14 - 16,701.03 29.01
DISTRICTS NOS. 5 & 6 JOINT - 35.69 2,965.28
DISTRICTS NOS. 6 & 7 JOINT -0- 120.26
$ 756,867.89 $1,532,071.09
-5-
06/10/87
ALL DISTRICTS Moved, seconded and duly carried:
Approving Change Order No. 6 to the
plans and specifications re That Change Order No. 6 to the plans and
Job No. P1-21 specifications for Installation of
V Replace:ent of Centrifuges with Belt
Filter Presses at Plant No. 1, Job No. P1-21, authorizing an addition of $1,970.37
to the contract with Margate Construction, Inc. for removal of abandoned drain
line and debris, and installation of columns to support walkway grating, be, and
is hereby, approved.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Change Order No. 1 to the
plans and specifications re That Change Order No. 1 to the plans and
Job No. P1-23R specifications for Replacement of
Primary Basins 1 and 2 at Plant No. 1,
Job No. P1-23R, authorizing an addition of $33,205,00 to the contract with
S. A. Healy Company, for modification to wiring and instrumentation to keep
Basin 5 in service during demolition of Basins 1 and 2, be, and is hereby,
approved.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Change Order No. 6 to the
plans and specifications re That Change Order No. 6 to the plans and
Job No. P2-31R specifications for Rehabilitation of
Primary Basins A, B, C, H, I, J, K, L,
M, N, 0, P and Q at Plant No. 2, Job No. P2-31R, authorizing an addition of
$58,482.10 to the contract with Morley-Ziebarth & Alper, a Joint Venture, for
seven item of cork, including removal of undisclosed concrete, design changes at
several basins and pump roans for safety and maintenance access, and granting a
time extension of 15 calendar days for completion of said additional work, be, and
is hereby, approved.
ALL DISTRICT'S Moved, seconded and duly carried:
Approving Change Order No. 7 to the
plans and specifications re That Change Order No. 7 to the plans and
Job No. P2-31R specifications for Rehabilitation of
Primary Basins A, B, C, H, I, J, K, L,
M, N, O, P and Q at Plant No. 2, Job No. P2-31R, authorizing an addition of
$131,500.00 to the contract with Morley-Ziebarth & Alper, a Joint Venture,
representing payment of bonuses for early completion of the contract, as provided
in the plans and specifications to minimize plant down-time and assure completion
on schedule of installation of major odor control facilities, be, and is hereby,
approved.
ALL DISTRICT'S Moved, seconded and duly carried:
Accepting Job No. P2-31R as
complete That the Boards of Directors hereby
adopt Resolution No. 87-41, accepting
Rehabilitation of Primary Basins A, B, C, H, I, J, K, L, M, N, 0, P and Q at Plant
No. 2, Job No. P2-31R, as complete, authorizing execution of a Notice of
Completion and approving the Final Closeout Agreement. A certified copy of this
resolution is attached hereto and made a part of these minutes.
-6-
06/10/87
ALL DISTRICTS Moved, seconded and duly carried:
Approving plans and specifications
re Specification No. R-025-1 and That the Boards of Directors hereby
Specification No. R-025-2 adopt Resolution No. 87-42, approving
plans and specifications for Underground
Tank Replacement at Plant No. 1, Specification No. R-025-1, and Underground Tank
Replacement at Plant No. 2, Specification No. R-025-2, and authorizing the General
Manager to establish the date for receipt of bids. A certified copy of this
resolution is attached hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
roving Addendum No. 5 to the
Engineering Services Agreement with That the Selection Committee
John Carollo Engineers re design of certification of the final negotiated
Job No. J-15 fee re Addendum No. 5 to the Engineering
Services Agreement with John Carollo
Engineers for design of Ocean Outfall Booster Station "C" at Plant No. 2, Job
No. J-15, providing for engineering services during construction phase of said
project, be, and is hereby, received, ordered filed and approved; arid,
FURTHER M M: That the Boards of Directors hereby adopt Resolution No. 87-43,
approving Addendum No. 5 to the Engineering Services Agreement with John Carollo
Engineers for design of Ocean Outfall Booster Station "C" at Plant No. 2, Job
No. J-15, providing for engineering services during construction phase of said
project, on an hourly-rate basis for labor plus overhead, direct expenses and
fixed profit, for an additional amount not to exceed $1,107,100.00, increasing
the total authorized compensation from $2,194,592.00 to an amount not to exceed
$3,301,692.00. A certified copy of this resolution is attached hereto and made a
part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Professional Services
Agreement with Malcolm Pirnie, Inc. That the Selection Comittee
re preparation of Operators' Guides certification of the final negotiated
and training services for odor fee re Professional Services Agreement
control scrubber systems at with Malcolm Pirnie, Inc. for
Plant No. 1 preparation of Operators' (Amides and for
training services for the odor control
scrubber systems at Plant No. 1, be, and is hereby, received, ordered filed and
approved; and,
FCAi'1'RER MWM: That the Boards of Directors hereby adopt Resolution No. 87-44, _
approving Professional Services Agreement with Malcolm Pirnie, Inc, for
preparation of Operators' Glides and for training services for odor control
scrubber systemas at Plant No. 1, on an hourly-rate basis for labor plus overhead,
direct expenses and fixed profit, for a total amount cat to exceed $30,650.00. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Amendment No. 4 to the
Agreement with Science Applications That the Selection Committee
International Corporation (SAIC) certification of the final negotiated
re Specification No. 5-032 fee re Amendment No. 4 to the Agreement
with Science Applications International
Corporation (SAIC), extending the existing contract between the Districts and SAIO.)
for Ocean Monitoring Contract Services for Districts' 120-Inch Ocean Outfall,
Specification No. 5-032, from July 1, 1987 to June 30, 1988, be, and is hereby,
received, ordered filed and approved; arid,
-7-
06/10/87
FURTHER MOVED: That the Hoards of Directors hereby adopt Resolution No. 87-45,
approving Ammxbert No. 4 to the Agreement with Science Applications
International Corporation (SAIC), extending the existing contract between the
Districts and SAIC for Ocean Monitoring Contract Services for Districts' 120-Each
Ocean Outfall, Specification No. 5-032, from July 1, 1987 to June 30, 1988, for
an amount not to exceed $1,664,656.00 for the third year of said contract. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Agreement for
Oceanographic Services, That the Selection Camrittee
Specification No. 5-042, with certification of the final negotiated
Enchanter, Inc. fee re Agreement for Oceanographic
Services, Specification No. 5-042, with
Enchanter, Inc., be, and is hereby, received, ordered filed and approved; and,
FURTHER M'NED: That the Hoards of Directors hereby adopt Resolution No. 87-46,
approving Agreement for Oceanographic Services, Specification No. 5-042, with
Enchanter, Inc., for a monthly fee of $4,200.00 effective July 1, 1987. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and deny claim of
James Otis Vesper - That the claim submitted by James Otis
Vesper, dated May 12, 1987, in the total
amount of $397.26 for alleged damages resulting from an accident involving a
District vehicle, be, and is hereby, received, ordered filed and denied; and,
FURTHER MOVED: That said claim be, and is hereby, referred to the Districts'
liability claims administrator and General Counsel for appropriate action.
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and deny claim of
David Alan Christianson That the claim submitted by David Alan
Christianson, dated May 15, 1987, in the
total amount of $1,994.36 for alleged damages resulting from an accident involving
a District vehicle, be, and is hereby, received, ordered filed and denied; and,
FURTHER MOVED: That said claim be, and is hereby, referred to the Districts'
liability claims administrator and General Counsel for appropriate action.
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and deny claim of
Irene Mae Snyder That the claim submitted by Irene Mae
Snyder, dated May 22, 1987, in the
estimated amount of $2,755.05 for alleged damages and injuries resulting from an
accident involving a District vehicle, be, and is hereby, received, ordered filed
and denied; and,
FURTHER W=: That said claim be, and is hereby, referred to the Districts'
liability claims administrator and General Counsel for appropriate action.
-8-
06/10/87
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing the General Manager to
designate members of the Boards That the General Manager be, and is
and/or staff to attend and partici- hereby, authorized to designate members
pate in etingss hearings, of the Boards and/or staff to attend and 1..
conferences, facility inspections participate in meetings, hearings,
and other functions conferences, facility inspections and
other functions which, in his opinion,
will be of value to the Districts or affect the Districts' interests, including,
but not limited to, those conducted by state and federal legislative and
regulatory bodies and the California Association of Sanitation Agencies,
California Water Pollution Control Association, Association of Metropolitan
Sewerage Agencies, and the Water Pollution Control Federation; and,
FURTHER MOVED: That reimbursement for travel, meals, lodging and incidental
expenses be, and is hereby, authorized in accordance with existing Districts'
policy and approved annual budget for 1987-88.
ALL DISTRICTS This being the annual meeting fixed by
Annual nomination for Chairman the Boards at which nominations are to
of the Joint Administrative be made for the office of Chairman of
Organization the Joint Administrative Organization,
the Secretary declared the nominations
open.
Director Don E. Smith was nominated as a candidate for the office of Chairman of
the Joint Administrative Organization.
There being no further nominations, the Secretary reported that the election
would be held at the regular July meeting in accordance with the Boards' Rules of
Procedures for the Conduct of Business of the Districts.
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and approve Stmmary
Financial Report for period ending That the staff Summary Financial Report
March 31, 1987 for the nine-month period ending
March 31, 1987, be, and is hereby,
received, ordered filed and approved.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Addendum No. 1 to the
plans and specification re That Addendum No. 1 to the plans and
Job No. J-15 specifications for Ocean Outfall Booster
Station "C" at Plant No. 2, Job
No. J-15, making miscellaneous technical clarifications and minor changes to
electrical and piping systems, be, and is hereby, approved.
ALL DISTRICTS Moved, seconded and duly carried:
Awarding Job No. J-15 to Advanco
Constructors, Division of Zurn That the Boards of Directors hereby
Constructors, Inc. adopt Resolution No. 87-47, receiving
and filing bid tabulation and
recommendation, and awarding contract for Ocean Outfall Booster Station "C" at
Plant No. 2, Job No. J-15, to Advanco Constructors, Division of Zurn Constructors,
Inc., for the total amount of $18,476,243.00. A certifier) copy of this resolution
is attached hereto and made a part of these minutes.
-9-
06/10/87
ALL DISTRICTS Moved, seconded and duly carried:
Approving plans and specifications
re Job No. P1-20 and Job No. P1-31 That the Boards of Directors hereby
adopt Resolution No. 87-48, approving
`.' plans and specifications for Headworks No. 2 at Plant No. 1, Job No. P1-20, and
Demolition of Digesters Nos. 1, 2 and 4; Replacement of Boiler; Piping Cleanouts;
and Grading and Paving at Plant No. 1, Job No. P1-31; and authorizing the General
Manager to establish the date for receipt of bids'. A certified copy of this
resolution is attached hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Approving plans and specifications
re Jobs Nos. P1-25, P2-32, P1-26, That the Boards of Directors hereby
P2-33 and P2-34 adopt Resolution No. 87-49, approving
plans and specifications for Covers for
Primary Basins at Plant No. 1, Job No. P1-25; Covers for Primary Basins at Plant
No. 2, Job No. P2-32; Foul Air Scrubber System at Plant No. 1, Job No. P1-26; Foul
Air Scrubber System at Plant No. 2, Job No. P2-33; and L%provenents to Grit
Facility B, Billings Tunnel and Distribution Structure A, Job No. P2-34, and
authorizing the General Manager to establish the date for receipt of bids. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and approve written
report of the Executive Committee That the written report of the Executive
and Fiscal Policy Committee Committee's and Fiscal Policy
Committee's meeting on May 27, 1987, be,
and is hereby, received, ordered filed and approved.
ALL DISTRICTS Moved, seconded and duly carried:
Receive and file Fiscal Policy
Committee Report re 1987-88 That the Fiscal Policy Committee's
personnel requirements and joint report and reco mendations re 1987-88
works budgets personnel requirements and joint works
budgets, be, and are hereby, received
and ordered filed.
ALL DISTRICTS Moved, seconded and duly carried:
Approving 1987-88 personnel
requirements and amending That the 1987-88 personnel requirements
Classification and Compensation be, and are hereby, approved as
Resolution No. 79-20, as amended recommended by the Fiscal Policy
Committee; and,
FOIY M MOVED: That the Boards of Directors hereby adopt Resolution No. 87-50,
amending Classification and Compensation Resolution No. 79-20, as amended, re
1987-88 personnel requirements. A certified copy of this resolution is attached
hereto and made a part of these minutes.
..d -10-
06/10/87
ALL DISTRICTS Moved, seconded and duly carried by the
Approving the 1987-88 Joint following roll call vote:
Operating Budget
AYES: Ben Bay, Roland Bigonger, John C. Cox, Jr., Norman Culver,
Richard B. Edgar, Don R. Griffin, Dan Griset, Robert Hanson,
Evelyn Hart, Ronald B. Hoesterey, John Kanel, Jack Kelly,
Ursula Kennedy, Gene Leyton, William Mahoney, Philip Maurer,
Tam Mays, Darryl Miller, J. Todd Murphy, James Neal, Carrey
Nelson, Bob Perry, Richard Polis, Joyce Risner, Don Roth, Sal
Sapien, J. R. "Bob" Siefan, Wayne Silzel, Don E. Smith, Roger
Stanton, John H. Sutton, Charles Sylvia, James Wahner
NOES: None
ABSENT: Buck Catlin, Sally Anne Miller, Arthur Newton ,
That the Joint Operating Budgets of County Sanitation Districts Nos. 1, 2, 3, 5,
6, 7, 11, 13 and 14 for the 1987-88 fiscal year, be, and are hereby, approved and
adopted as follows:
Joint Operating/working Capital Funds $33,987,000.00
Workers' Compensation Self-Insured Fund 666,000.00
Self-Funded Health Plan Trust Fund 885,000.00
Public Liability Self-Insured Fund 1,250,000.00
ALL DISTRICTS Moved, seconded and duly carried by the
Approving the 1987-88 Capital following roll call vote:
Outlay Revolving Fund Budget
AYES: Ben Bay, Roland Bigonger, John C. Cox, Jr., Norman Culver,
Richard B. Edgar, Don R. Griffin, Dan Griset, Robert Hanson,
Evelyn Hart, Ronald B. Hoesterey, John Kanel, Jack Kelly,
Ursula Kennedy, Gene Leyton, William Mahoney, Philip Maurer,
Tom Mays, Darryl Miller, J. Todd Murphy, James Neal, Carrey
Nelsm, Bob Perry, Richard Polis, Joyce Risner, Dan Roth, Sal
Sapien, J. R. "Bob" Siefen, Wayne Silzel, Don E. Smith, Roger
Stanton, John H. Sutton, Charles Sylvia, James Wahner
NOES: None
ABSENT: Buck Catlin, Sally Anne Miller, Arthur Newton
That the Capital Outlay Revolving Fund Budget (Joint Works Construction) of
County Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14, be, and is
hereby, approved and adopted in the total amount of $57,659,000.00.
06/10/87
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing the Fiscal Policy
Committee to evaluate proposals That the Fiscal Policy Committee be, and
and to place Excess Workers' is hereby, authorized and directed to
Compensation insurance coverage evaluate proposals obtained by the
effective July 1, 1987 Districts' insurance broker and to place
Excess Workers' Compensation insurance
coverage effective July 1, 1987; and, '
FURTHER MOVED: That said action shall be submitted to the Joint Hoards for
ratification or revision at the regular meeting on July 8, 1987.
ALL DISTRICTS bowed, seconded and duly carried:
Fixing acd Establishing Rules of
Procedure for the Conduct of That the Boards of Directors hereby
Business of the Districts adopt Resolution No. 87-51, Fixing and
Establishing Rules of Procedure for the
Conduct of Business of the Districts, and Repealing Resolutions Nos. 64-3, 67-52,
67-79, 70-154, 71-90, 72-1.1, 73-81, 76-10, 76-18, 77-140, 79-103, 84-92, 85-5-13,
86-1-14, and all other resolutions previously adopted by these Boards with regard
to said meeting procedures. A certified copy of this resolution is attached
hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing) participation with the
County of Orange and other inter- That participation with the County of
ested agencies in the County's Orange and other interested agencies in
Household and Very Sall the County's Household and Very Small
Generators' Hazardous Waste Generators' Hazardous Waste Collection
Collection Program Program be, and is hereby, authorized;
and,
FURTHER MOVED: That payment for the Districts' share of collection and disposal
costs for said program in the amount of $125,000.00 for the 1987-88 fiscal year
be, and is hereby, approved.
ALL DISTRICTS Moved, seceded and duly carried:
Declaring intent to participate in
the Tamper Committee Process (re The Boards of Directors do hereby
AB 2948) for preparing the County's declare their intent to participate in
Hazardous Waste Management Plan the Tanner Coomittee Process (re
AB 2948) for preparing the County's
Hazardous Waste Management Plan, in an amount to be determined at a later date
upon finalization of the proposed program and further discussions with the County
of Orange relative to the appropriate level of participation by the Districts,
based upon applicability. of the program to the Districts' overall industrial and
hazardous waste control responsibilities.
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing the General Counsel and
staff to appeal to the South Coast That the Districts' General Counsel and
Air Quality Management District staff be, and are hereby, authorized and
Hearing Board re "shutdown" directed to appeal to the South Coast
conditions imposed by the SCAQMD on Air Quality Management District Hearing
Permits to Construct and Permits to Board, relative to the "shutdown"
gad Operate Districts' sewerage conditions imposed by the SCAUM on
facilities Permits to Construct and Permits to
Operate Districts' sewerage facilities,
-12-
06/10/87
requiring the Districts to shut dam wastewater treatment facilities if air
emission control equip ent is inoperable, as such a permit condition would
jeopardize the Districts' ability to construct and effectively operate its
facilities and maintain water quality standards and canpliance with NPDES ocean
discharge permit requirements set forth by other regulatory agencies.
ALL DISTRICTS Moved, seconded and duly carried:
Amending Classification and
Compensation Resolution No. 79-20, That the Boards of Directors hereby
as amended, re Management and adopt Resolution No. 87-52, Amending
Supervisory Classification Salary Classification and Campensation
Range Pdiustments Resolution No. 79-20, as amended, re
Management and Supervisory
Classification Salary Range Adjustments pursuant to the Districts' Management
Performance Review Program (MPRP). A certified copy of this resolution is
attached hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing the Director of
Finance to certify claims and That the Director of Finance be, and is
forward to County Auditor for hereby, authorized to certify claims and
payment forward to the Orange County auditor for
immediate payment for expenditures
incurred after June 30, 1987, and that he declare that such certification shall
comply with the provisions of Resolution No. 87-51 pertaining to procedures for
payment of claims against the Districts until the 1987-88 budgets are adopted by
the respective Districts.
DISTRICT 1 Moved, seconded and duly carried:
Approving Addendum No. 1 to the
Engineering Services Agreement with That the Board of Directors hereby
RMG Engineering, Inc. re adopts Resolution No. 87-53-1, approving
Contract No. 1-15R Addendum No. 1 to the Engineering
Services Agreement with RM3 Engineering,
Inc. for design of Santa Ana/Dyer Road Trunk Sewer Manhole Rehabilitation,
Contract No. 1-15R, for additional engineering services required to modify said
plans to correct a deviation from the "as-built" drawings determined after the
plans and specifications were canpleted and to add two manholes to said plans, on
an hourly-rate basis for labor including overhead, direct expenses and fixed
profit, for the additional amount of $1,280.00, increasing the total authorized
compensation Fran $13,800.00 to an amount not to exceed $15,080.00. A certified
copy of this resolution is attached hereto and made a part of these minutes.
DISTRICT 1 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 1 be adjourned. The Chairman then
declared the meeting so adjourned at 8:00 p.m., June 10, 1987.
DISTRICT 3 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 3 be adjourned. The Chairman then
declared the meeting so adjourned at 8:00 p.m., June 10, 1987.
-13-
06/10/87
DISTRICTS 5 E 6 Moved, seconded and duly carried:
Approving Engineering SeNTCes
Agreement with Robert Bein, Williev That the Selection Crnmittee
Frost and Associates re design of certification of the final negotiated
Contract Nos. 5-29-1 and 5-29-2 fee re Engineering Services Agreement
with Robert Bain, William Frost and
Associates for design of Replacement of Portions of Coast Highway Force main and
Gravity Trunk, Contract No. 5-29-1, and Replacement of Portions of Coast Highway
Force Main, Contract No. 5-29-2, be, and is hereby, received, ordered filed and
approved; and,
FURTHER =W: That the Board of Directors hereby adopts Resolution No. 87-56,
approving Engineering Services Agreement with Robert Bain, William Frost and
Associates for design of Replacement of Portions of Coast Highway Force Main and
Gravity Trunk, Contract No. 5-29-1, and Replacement of Portions of Coast Highway
Force Main, Contract No. 5-29-2, on an hourly-rate basis for labor plus overhead,
direct expenses and fixed profit, for a total amount not to exceed $75,000.00. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
DISTRICTS 5 6 6 Moved, seconded and duly carried:
Authorizing execution of a
cooperative agreement with the That the Boards of Directors hereby
City of Newport Basch re adopt Resolution No. 87-57, authorizing
Contract No. 5-29-1 and directing preparation and execution
of a cooperative agreement with the City
of Newport Beach, providing for inclusion of Districts' project for Replacement of
Portions of coast Highway Force Main and Gravity Trunk, Contract No. 5-29-1, in
the City's Pacific Coast Highway improvement project; and,
PURZSER Mt7JED: That payment by the Districts be, and is hereby, authorized in an
amount not to exceed $750,000.00 for their share of the costs of said project to
be administered by the City.
DISTRICT 5 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 5 be adjourned. The Chairman then
declared the meeting so adjourned at 8:00 p.m., June 10, 1987.
DISTRICT 6 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 6 be adjourned. The Chairman then
declared the meeting so adjourned at 8:00 p.m., June 10, 1987.
DISTRICT 11 Moved, seconded and duly carried:
Receive, file and approve Project
Report for the Ocean Avenue Trunk That the Project Report for the Ocean
Sewer prepared by Boyle Engineering Avenue Trunk Sewer, Lake Street to
Corporation Goldenwest Street, Huntington Beach,
prepared by Boyle Engineering
Corporation be, and is hereby, received, ordered filed and approved.
.. -14-
06/10/87
DISTRICT 11 Moved, seconded and duly carried:
Authorizing the Selection Ccamittee
to negotiate with Hoyle That the Selection Camtittee be, and is
Engineering Corporation re design hereby, authorized to solicit a
of Contract No. 11-16 proposal from Boyle Engineering
Corporation and negotiate an agreement
for design of Rehabilitation of Ocean Avenue Trunk Sewer, Contract No. 11-16, from
Iake Street to Goldenwest Street.
DISTRICT 11 Moved, seconded and duly carried:
Authorizing and directing staff and
General Counsel to Prepare an That the staff and General Counsel be,
agreement with the City of and are hereby, authorized and directed
Huntington Beach to convey owner to prepare an agreement with the City of
ship of Oaten Avenue Trunk Sewer Huntington Beach to convey ownership of
Ocean Avenue Trunk Sewer from the
District to the City.
DISTRICT 11 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of Canty Sanitation District No. ll be adjourned. The Chairman then
declared the meeting so adjourned at 8:00 p.m., June 10, 1987.
DISTRICT 13 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of Canty Sanitation District No. 13 be adjourned. The Chairman then
declared the meeting so adjourned at 8:00 p.m., June 10, 1987.
DISTRICT 14 Moved, seconded and duly carried:
Ordering Detachment No. 1 from
District No. 14 That the Board of Directors hereby
adopts Resolution No. 87-60-14,'ordering
the detachment of 132 acres of territory from District No. 14 in the vicinity
southeast of the City of Newport Beach in unincorporated County territory, which
was inadvertently included in the formation of said District 14 and is currently
also in District No. 5, proposed Detachment No. 1 from County Sanitation District
No. 14. A certified copy of this resolution is attached hereto and made a part of
these minutes.
DISTRICT 14 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 14 be adjourned. The Chairman then
declared the meeting so adjourned at 8:00 p.m., June 10, 1987.
DISTRICT 2 Moved, seconded and duly carried:
Ordering Annexation No. 66 -
Western Money Center Annexation That the Board of Directors hereby
adopts Resolution No. 87-54-2, ordering
annexation of .655 acres of territory to the District in the vicinity of Mohler
Drive and Santa Ana Canyon Road in the City of Anaheim, proposed Annexation
No. 66 - Western Money Center Annexation to County Sanitation District No. 2. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
-15-
06/10/87
DISTRICT 2
Actions re Final Focused Environ-
mental Impact Report for Amendment
No. 1 to the Consolidated Master
Plan of Trunk Sewers for County
`..✓ Sanitation Districts Nos, 2, 3 and
11 re District No. 2
bluclid/Newhope-Placentia Drainage
Area
Receive and file Staff Report Moved, seconded and duly carried:
dated May 19, 1987
That the Staff Report dated May 19,
1987, sumarizing the Final Focused EIR for Amendment No. 1 to the
Consolidated Master Plan of Trunk Sewers for County Sanitation District
Nos. 2, 3 and 11 relative to the District No. 2 Euclid/Newhope-Placentia
Drainage Area, be, and is hereby, received and ordered filed.
Receive, file and approve Final Moved, seconded and duly carried:
Focused EIR
That the Final Focused EIR be, and
is hereby, received, ordered filed and approved; and,
RMTHER MOVED: That the Board of Directors hereby certify that said Final
Focused SIR has been completed in campliance with the State and District
Guidelines Implementing the California Environmental Quality Act of 1970, as
amended.
Certifying the Final Focused Moved, seconded and duly carried:
Environmental Lmpact Report for
Amendment No. 1 That the Board of Directors hereby
adopts Resolution No. 87-55-2,
certifying the Final Focused Environmental Impact Report for Amendment No. 1
to the Consolidated Master Plan of Trunk Sewers for County Sanitation
District-Nos. 2, 3 and 11 relative to the District No. 2
Euclid/Newhope-Placentia Drainage Area; making certain findings in
connection therewith; adopting a statement of overriding considerations; and
authorizing filing of a Notice of Determination re said project. A
certified copy of this resolution is attached hereto and made a part of
these minutes.
DISTRICT 2 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 2 be adjourned. The Chairman than
declared the meeting so adjourned at 8:02 p.m., June 10, 1987.
DISTRICT 7
Actions re North Airport Diversion
Sewer, Contract No. 7-10, and the
South Airport Diversion Sewer,
Contract No. 7-10-1
Receive and file Staff Report Following a review of the written
staff report on the North Airport
Diversion Sewer, Contract No. 7-10, and the South Airport Diversion Sewer,
Contract No. 7-10-1 by the Director of Engineering, it was moved, seconded
and duly carried:
That the Staff Report dated June 2, 1987 be, and is hereby, received and
ordered filed.
-16-
06/10/87
Receive and file report of Hoyle Moved, seconded and duly carried:
N}1ai11eering Corporation re Trunk
Sewer Relocation Across Join Wayne That the report of Boyle Engineering
Airport Property; and approving Corporation dated March 12, 1987,
Amendment No. 4 to the Master Plan re Trunk Sewer Relocation Across
of Trunk Sewer Facilities to Sent John Wayne Airport Property be, and
District No. 1, the Northern Half is hereby, received and ordered
of District No. 6, and District filed; and,
No. 7
FLUUB R MOVED: That Amendment No. 4
to the Master Plan of Trunk Sewer Facilities to Serve District No. 1, the
Northern Half of District No. 6, and District No. 7, to abandon the South
Irvine Subtrunk Sewer (Extension of Michelson Drive Subtrunk Sewer) and
portion of the MacArthur Trunk Sewer westerly of MacArthur Boulevard within
Orange County's John Wayne Airport, and to add the North Airport Diversion
Sewer in Business Center Drive and private property from MacArthur Boulevard ,
to Von Karmen and the South Airport Diversion Sewer in Campus Drive from a
point westerly of MacArthur to Von Karmen Avenue, be, and is hereby,
approved.
Receive and file Initial Study and Moved, seconded and duly carried:
Environmental Impact Assessment and
proposed Negative Declaration for Tat the Initial Study and
Abandonment of South Irvine Environmental Impact Assessment and
Subtrunk Serer and portion of proposal Negative Declaration for
MacArthur Trunk Sewer and Redire Abandonment of South Irvine Subtrunk
tion of North and South Airport Sews (Extension of Michelson Drive
Diversion Severs Subtrunk Sews) and portion of the
MacArthur Trunk Sewer westerly of
MacArthur Boulevard; and Redirection of Flows to the North Airport Diversion
Sewer (Contract No. 7-10) and the South Airport Diversion Sewer (Contract
Mo. 7-10-1), be, and are hereby, received and ordered filed; and,
FURTHER MWED: That staff be, and is hereby, directed to publish/distribute
said Negative Declaration pursuant to CEQA procedures.
Approving plans and specifications [hived, seceded and duly carried:
for Contract No. 7-10
That the Board of Directors hereby
adopts Resolution No. 87-59-7, approving plans and specifications for the
North Airport Diversion Sews, Contract No. 7-10, and authorizing the
General Manager to establish the date for receipt of bids. A certified copy
of this resolution is attached hereto and made a part of these minutes.
DISTRICT 7 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 7 be adjourned. The Chairmen then
declared the meeting so adjourned at 8:04 p.m., June 10, 1987.
S
ecretary, Boafd of Directors
County Sanitation Districts Nos. 1, 2, 3,
5, 6, 7, 11, 13 and 14
-17-
FUND 9199 - JT DIST WORKING CAPITAL FROCESSING DATE 5/58187 PAGE
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/13/87
WARRANT NO. VENDOR AMOUNT DESCRIPTION
O86C30 A.M. BEST COPFANY 577.93 PUBLICATION
086031 AIR COLD STIFFLY INC. S194.62 ELECTRONIC PARTS
.i 086-32 AIR FRODUCTS L CHEMICAL INC. 5552.00 OXYGEN PARTS
086033 ALL-STATE VEh ICLES. INC. $1.806.21 VEHICLE LEASE
- - 086C34 ALLIED CORPORATIOK S4.838.20 CATIONIC POLYMER
086935 ALLIS-CHALMERS COPP. S1.249.10 PUMP SUPPLIES
006136 ALL PURE CHEMICAL 537.702.00 CHLORINE
086C37 ALKAR SERVICES. INC. 51.139.34 OFFICE SUPPLIES
GB69 8 AMERICAN COMPRESSOR CO. $423.90 COMPRESSOR PARTS
086039 AMERICAN FLEET PARTS SS1.96 AUTOMOTIVE PARTS
-- � 086046 AMERICAN SCIENTIFIC PRODUCTS $1.596.55 LAB SUPPLIES
OBfi OAI ANAHEIM BUSINESS MACHINES S496.O0 CALCULATORS .
+A 086042 THE ANCHOR PACKING CO. $2,015.25 PUMP PARTS 6 REPAIRS
-" 006643 A-PLUS SYSTEMS - 53.945.78 PRINTING
006894 AQUA BEN CORP. $1.514.87 ANIONIC POLYMER
086045 ASSOCIATED LABORATORIES S495.00 LAB SAMPLES/SERVICES
�— C86046 ATKINS TECHNICAL. INC. S24.82 ELECTRONIC REPAIRS
m C86047 ATLANTIC 6 GULF FISHING SUPPLY $103.40 LAB SUPPLIES
OB6C48 B6B TRUCKS 5736.70 AUTOMOTIVE REPAIR
_i2 086049 FALCON DISPOSAL SERVICE 5117.529.94 GRIT REMOVAL
'-+ O861,50 BRY SAFETY S SUPPLY 539.64 SAFETY SUPPLIES
'w 086051 BSI CONSULTANTS. INC. 51.920.00 ENGINEERING - PV-144
686052 BASIN VALVES '" " '" - ' " ' s625.52"' - VALVE REPAIR'
in u6F053 ROBERT BEIN.WILLIAM FROST S AS $846.29 ENGINEERING SERVICES
1 O86054 BOLSA RADIATOR SERVICE S114.18 AUTOMOTIVE REPAIR
-_� 086055 BOMAR MAGNETO SERVICE. INC. $82.00 INSTRUMENT PARTS
O86056 BOYLE ENGINEERING CORE S25.418.94 ENGINEERING SERVICES J-16/7-7
066C57 Y.C. BROOKE 1650.10 DEFERRED COMPENSATION
006058 BROOKS INSTRUMENT DIV. 4326.54 - INSTRUMENTS
066359 BROWN S CALDWELL $306.10 LAB SERVICES
•i. 086060 BRUNING 594.93 MISCELLANEOUS SUPPLIES
-- 686061 BUCKEYE GAS PRODUCTS 519.29 PROPANE
o. 086062 YILLIAM H. BUTLER 5309.89 PETTY CASH
086863 CPT CORPORATION $8.450.66 DISK DRIVE
G66 CfiA CAL-GLASS FOR RESEARCH. INC. s853.14 LAB SUPPLIES
_ C86C65 CALTROL . INC. $1.324.24 MECHANICAL PARTS
_ 086066 CALIFORNIA CONTROLS CO. $68.91 REPAIR PARTS
086067 CALIFORNIA ENVIRONMENTAL $1.764.90 CHLORINATION PARTS
C86668 JOMN CAROLLO ENGINEERS $9.319.44 ENGINEERING SERVICES PI-22/J-6-2
7 086069 CASTLE CONTROLS, INC. 5297.53 VALVE PARTS
086070 CHEMWEST INDUSTRIES. INC. 532.872.29 FERRIC CHLORIDE
_ 086671 CHEVRON U.S.A.. INC. 15.912.3C GASOLINE
C66072 YILLIAM N. CLARKE 1209.30 EMPLOYEE MEETING EXPENSE
C86073 COAST FIRE EQUIPMENT S7.428.69 SAFETY SUPPLIES
286674 COAST TRANSMISSION 559.17 AUTOMOTIVE PARTS
086075 CONSOLIDATED ELECTRICAL DIST. 11.941.49 ELECTRIC PARTS
.:i
e<
ci—'
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/(-8/87 PAGE 2
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 35/13/87
WARRANT NO. VENDOR AMOUNT DESCRIPTION
OB6076 CONSOLIDATED REPROGRAPHICS SS9.50 PRINTING
066077 COSTA MESA AUTO SUPPLY 5726.72 AUTOMOTIVE PARTS
066678 COUNTY WHOLESALE ELECTRIC $8.48 ELECTRIC PARTS
G66079 CAL WATER $118.75 LEASE
066080 CUSTOMIZED PEPSONNEL LTD. 93.I15.00 TEMPORARY SERVICES
CE6081 DANIELS TIRE SERVICE $1.333.86 AUTOMOTIVE PARTS
G66082 MICHAEL R. DESLIEUX S497.27 EMPLOYEE MEETING EXPENSES
086063 DIFILIPPO ASSOCIATES S449.65 PRINTING
486.084 DIGITAL EOUIPMENT CORP. $162.00 SERVICE AGREEMENT
466383 DOMAN ELECTRIC, INC. 39.395.25 PROFESSIONAL SERVICES PI-22-1
-- -- 086086 DORADO ENTERPRISES, INC. $51,198.30 CONTRACT SERVICES-WORK PLATFORMS/TRICKLING FILI
086487 DUNN EDWARDS CORP. $552.09 PAINTING SUPPLIES
086C88 EASTMAN, INC. 33.G91.19 OFFICE SUPPLIES
-.-- G86C89 FLW $875.82 ELECTRONICS
686090 FARR SALES l SERVICE S75.47 ELECTRIC PARTS
066091 FEDERAL EXPRESS CORP. SI10.00 FREIGHT
"'---- 086092 FISCHER S PORTER COW-" '-""' ' ' "" "' -" $3.921.32 -- -' MECHANICAL PARTS/CHLORINATION PARTS-
:-TY7 086G93 GELBER PUMPS. INC. $141.48 PUMP PARTS
S_ 486094 CITY OF FOUNTAIN VALLEY 1 $2.794.84 WATER
H 086095 FOUNTAIN VALLEY PAINT $1.418.79 PAINT SUPPLIES
.to 086696 THE FOXBORO COMPANY S372.40 ELECTRONIC PART
-"" 386097 FRANCE COMPRESSOR PRODUCT Si90.36 MACHINE PARTS
FROST ENGINEERING SERVICES CO-. ---' S112:9l` - " - ENGINE PARTS'
-.Y G66C99 CITY OF FULLERTON SA8.09 WATER
' 1 066100 GEC AUTOMATION PROJECTS. INC. S2.379.24 INSTRUMENT PARTS
086101 GEN-O-LITE PLASTICS CORP. - 560.07 PLEXIGLASS
086102 GENERAL TELEPHONE CO. S1.46S.58 TELEPHONE
;;� 086103 GIERLICH-MITCHELL. INC. $7,536.06 MACHINE PARTS
'---06636A' GLOBAL ENGINEERING"'"' " ' - "'-' -" '-' 1911.98 - PUBLICATION
066105 GRAPHIC CONTROLS 39TO.27 INSTRUMENT PARTS
C56206 04RRINGTON INDUSTRIAL PLASTICS 111.664.73 FIBERGLASS
--"--8B61C7 HOOPER CAMERA STORES $1.037.95 FILM
-i 466108 HOUSE OF BATTERIES $615.69 AUTOMOTIVE PARTS
G8E109 HUN71NGTON SUPPLY $15.37 HARDWARE
J86116 ITT STANDARD ' - -' '- - - S9.)69.36 - HEAT EXCHANGER
666111 IMPERIAL WEST CHEMICAL S2.193.63 FERROUS CHLORIDE
086112 INDUSTRIAL THREADED PRODUCTS 3543.25 HARDWARE
--" 086213 IRVINE RANCH WATER DISTRICT SA.00 WATER
086114 A.F. JOHNSON COMPANY S760.00 INSTRUMENT REPAIR
k 386115 KANAN BEARINGS S SUPPLY $2,130.63 BEARINGS/MISCELLANEOUS SUPPLIES
6<-- JEE 116 KARELS. DEAN' - ""` -' S5.69 EMPLOYEE MILEAGE
086117 KEENAN SUPPLY 11.649.36 VALVES
7. 386118 KEN-S OIL. INC. $122.53 WASTE OIL REMOVAL
OP6119 KING BEARING. INC. $993.06 MECHANICAL PARTS
_ 086120 L.A. LIOUID HANDLING SYSTEMS 9321.25 PUMP PARTS
C86121 L.S.U.S., INC. ST8.91 REGULATORS
Fes,
FUND 9199 - JT GIST WORKING CAPITAL PROCESSING DATE 5/35/27 FAGE
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/13/87
WARRANT NO. VENDOR AMOUNT OESC4IPTION
D86122 LAURSEN COLOR LAB $33.42 PHOTO LAB
356123 LEE S NO CONSULTING ENGR. $5,903..10 ENGINEERING SERVICES-Pi-23R.P1-24R,P2-31R
OE6224 LIGHTING DISTRIBUTORS. INC. $82.42 LAMPS
086125 LIMITORGUE CORF. $415.69 MECHANICAL PARTS
08F.126 K.F. LINDSTROM. INC. $5,524.54 CONSULTING SERVICES-PI-20.J-15
086127 M.G. INDUSTRIES $457.94 SPECIALTY GASSES
086228 MPS 56.47 PHOTO SERVICES
086129 MAIN FRAME SERVICES $354.J5 COMPUTER REPAIR
066130 MALCOM FIRNIE. INC. 52.539.45 ENGINEERING SERVICES-PI-25.P1-26
086131 MARVAC ELECTRONICS S54.86 ELECTRIC PARTS
086132 MATT - CHLOP. INC. 4342.29 CHLORINATION SUPPLIES
086133 MCKINLEY EQUIPMENT CORP $453.24 ELECTRONIC CRT REPAIR
066134 MINE SAFETY APPLIANCES CO. $5,493.03 SAFETY SUPPLIES
066135 CITY OF NEWPORT BEACH $12.16 WATER
086136 P.J. NOBLE COMPANY $5,393.39 CONSTRUCTION-PI-30
686137 ORANGE COAST ELECTRIC SUPPLY $158.58 ELECTRONIC SUPPLIES
- ' 686138 ORANGE COUNTY WHOLESALE S74G.75 1. " " " "
TT1 086139 ORANGE VALVE 6 FITTING CO. $1,720.85 PLUMBING A PIPE
...X 066140 COUNTY OF ORANGE $61,020.00 WASTE HAUL 6 GATE FEE
ti 066141 COUNTY SANITATION DISTRICT $5,567.19 REPLENISH WORKER'S COMP
: w 086142 PSG SEWER SERVICES. INC. 519561.56 CONTRACT SERVICES
-4 086143 PACIFIC DATA CON SYSTEMS 5941.11 _ INSTRUMENT
666144 PACIFIC SAFETY EQUIFMENT CO. SI..29.69 - - SAFETY EQUIPMENT' -'
� 3 086145 PACIFIC BELL $211.24 TELEPHONE
066146 PAK WEST $629.72 HARDWARE
TW CE6147 PATA.S SHOP 51.650.00 BUILDING MATERIALS
086148 PFALT2 8 54UER 581.90 LAB SUPPLIES
_ _ 086149 PHOTO 8 SOUND CO. _ $39.62 OFFICE SUPPLIES
G86256 PICKWICK PAPER PRODUCTS 1286.20 1. ..
086151 PLAINS TRUEVALUE HARDWARE 3620.91 HARDWARE
C86152 POMONA VALLEY EQUIPMENT $5,768.20 CONSTRUCTION
086153 POSTMASTER $2.030.10 POSTAGE
C66254 POWER SPECIALISTS. INC. $212.30 ELECRONICS
086155 HAROLD PRIMROSE ICE $50.00 ICE
- - 066156 PROCESS COMPONENTS CO..INC. 51.474.14 OXYGEN PARTS
061157 PROS-HONROVIA $823.83 INSTRUMENT
P86158 PULASKI S ARITA ARCHITECTS $296.39 PROFESSIONAL SERVICES-P2 M/P
666159 RAIN90W DISPOSAL CO. $430.50 WASTE REMOVAL
086260 THE REGISTER. LEGAL N100048 S1C8.94 ADVERTISEMENTS
_ 066161 REMEDY TEMF $2,670.70 TEMPORARY SERVICES
_ .e6162 HOMES AUTO TRIM 5849.50 AUTOMOTIVE PARTS
_ P86163 ROTANIUN PRODUCTS CO. $231.12 ELECTRONIC SUPPLIES
C86164 JOSEFH T. RYERSON S SON, INC. 5169.1E ' METAL
686165 SANCON ENGINEEPING . INC. 514.898.06 CONTRACT SERVICE-SEWER LINE COATING
G66166 SANTA ANA ELECTRIC MOTORS 6448.94 ELECTRIC PARTS
066167 SANTA FE SYSTEMS COMPANY $330.46 MECHANICAL PARTS
FUND NO 9199 . JT DIST WORKING CAPITAL PROCESSING DATE 5/08/87 PAGE 4
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 35/13/P7
-" WARRANT NO. VENDOR AMOUNT DESCRIPTION
086168 SARGENT-WELCH SCIENTIFIC CO. $2.650.90 PUMP
086169 SCIENCE APPLICATIONS INT•L $105,792.86 LAB SERVICES
086170 SEA COAST DESIGNS $3,715.30 OFFICE FURNITURE
C86171 CITY OF SEAL BEACH $13.58 WATER
ESE172 SHAMROCK SUPPLY 1436.83 HARDWARE
096173 SIGMA ENERGY SYSTFP.S 310A3.23 CONTRACT SERVICES-SILENCING OF C HEADWORKS
086174 SMITH-EMERY CO. $331.00 CONTRACT SERVICE - SOIL TESTING
086175 THE SOF}WARE GPOUF 595.00 SUBSCRIPTION
686176 SOIL AND TESTING ENGINEERS STC6.00 SOIL TESTING
C86177 SOUTHERN CALIF. EDISON CO. 513.236.69 POWER
"'--"OP6178 SOUTHERN COUNTIES OIL CO. 112,486.54 DIESEL FUEL
086179 SPARLING INSTRUMENT CO'..INC. 55.023.93 OFFICE SUPPLIES/FLOWMETER
C86180 STAR TOOL S SUPPLY CO. $1,193.9% TOOLS
086181 STERLING OPTICAL $152.00 OPTICAL SERVICE
066182 SUPELCOr INC. 951.74 OCEAN SAMPLES
-� 086183 SUPER ICE CORP. $69.31 LAB SUPPLIES
--'"-" OBAIb4 ' THE SUPPLIERS ---.___... .__._._.... ._._.__ .. ._._ $IWu27.66 "'--"" - '- TOOLS/SAFETY SUPPLIES/MECHANICAL PARTS X --
0861E5 SURVEYORS SERVICE CO. $157.99 TOOLS
056186 CASTLE / DIV. OF SYBRON CORP. $212.00 SERVICE AGREEMENT
086197 YAK TAKAMINE 1' 52s29U.Ot LANDSCAPE
:'l70 086188 TALE BIr MAXIM $41.50 EMPLOYEE MEETING EXPENSES
_C86189 TEKMAR COMPANY $6.395.50 LAB EQUIPMENT
086196 LEE TERRY "" -_..._... _. _.__ ._.- _ - --__._.._ -$86:83 `"' "_' '` -" EMPLOYEE MEETING EXPENSES - -
��D 086191 THOMPSON EQUIPMENT CO., INC. $2.313.10 METER PARTS
096192 THORPE INSULATION 51.3.95.80 INSULATION
C66193 TONARCO $238.10 HARDWARE
086194 TRAVEL TRAVEL $1.348.00 TRAVEL EXPENSES
386195 H.O. TRERICE CO. $554.10 AUTOMOTIVE PARTS
- --086196 TRUCK C AUTO SUPPLY.- INC.' - " "" $3,671.96 - AUTOMOTIVE PARTS
086197 J.6. TUCKER S SON. INC. $825.66 SENSORS
006199 U.S.O. CORP. $245.34 SAFETY REPAIR
--- 086199 UNOCAL 5290.15 GASOLINE
006200 UNITED PARCEL SERVICE 5157.23 FREIGHT
086201 U.S. EQUIPMENT CO.. INC. _ $1.395.19 COMPRESSOR REPAIR
086232 UNITED WESTERN ELEVATOR - - 5290.66 SERVICE AGREEMENT
066203 USERS PREFERENCE. INC. $491.54 COMPUTER EQUIPMENT
0862C4 VYR SCIENTIFIC 63r153.45 LAB SUPPLIES
086205 VALLEY CITIES SUPPLY CO. $3,473.80 FITTINGS
086206 ARCO VALVE S PRIMER CORP. $169.80 STEEL
.•-i 066208 DIANE VAN HORN 631.71 EMPLOYEE MILEAGE
O6E208 AICH APD V. VON LANG EN ' -" '"' '" "' $631.71 - EMPLOYEE MEETING EXPENSES
0962.9 V.Y. PRODUCTS. INC. 5179.60 SAFETY SUPPLIES
586213 WALLACE S TIERNAN $374.71 VALVE
086211 JOHN R. WAFLES $445.30 CONTRACT SERVICES-ODOR CONTROL
OSE212 WEST COAST ANALYTICAL SPV. $450.01 LAB SERVICES
O86213 WESTRERN EXTERMINATOR CO. 3875.OG CLAIM SETTLEMENT
FUND 9199 - JT DIST WORKING CAFITAL PPOCESSING DATE 5/311/87 PAGE
REPORT NUMBCR AP45
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS P41D 05/13/87
WARRANT NO. VENDOR AMOUNT DESCRIPTION
066214 WESTERN TECHNOLOGY ASSOCIATES 3381.E^. INSTRUMENT
.86215 WESTERN WIRE 6 ALLOY $227.69 AUTOMOTIVE SUPPLIES
CSE216 WHITE, FINE L VERVILLE S4.087.97 OOSD RESEARCH-LCGAL SERVICES
086217 WILLOAN ASSOCIATES 317.722.23 ENGINEERING SERVICES
OSE218 ROURKE A WOODRUFF 319,778.E8 LEGAL SERVICES"
A86219 WORKING SMART 347.8E PUBLICATION
GBE220 XEROX CORP, $2,209.68 PRINTING
086221 BD8 YOUNG ROOFING S63000 BUILDING MATERIALS
086222 ZIP TEMPORARY PERSONNEL $398.56 TEMPORARY PERSONNEL
-----------------
TOTAL CL41MS PATE 05/13/87 S756,857.89
- - SUMMARY _ AMOUNT
m
/1 OPER FUND 1 $ 425.00
M2 OPER FUND 3,743.34
F2 ACO FUND 2,418.22
92 F/R FUND. ....-.. _. ._. ..__.,_._. . .__....._-_______..16,490.23 . .. .
n B3 OPER FUND 1,277.44
1 85 OPER FUND 2,592.51
-173 15 ACO FUND 5,914.49
/6 OPER FUND 159.34
86 ACO FUND 2,226.80
/7 OPER FUND ... ...__._.. .._. . ____- _... 6,118.90 -
/7 ACO FUND 3,340.20
/7 F/N FUND 14,898.00
N11 OPEN FUND 8,712.33
III ACO FUND 1,105.74
914 ACO FUND 16,701.03
d566 OPER FUND .. _. .. . _.._ _..__ _ . ._..-__-.._.. .__ 35,G9
/7914 OPER FUND 244.92
JT OPER FUND 458,763.27
CORF - 139,015.26
SELF FUNDED WORKERS COMP INSURANCE FUND 10,646.29
JT WORKING CAPITAL 62,038.87
$756,867.89
FUND NO 9199 - JT GIST WORKING CAPITAL PROCESSING DATE 5/25/87 PAGE I
._.. REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
�. CLAIMS PAID 05/27/87
WAP.RAAT NO. 'VENCOR AMOUNT DESCRIPTION
GBE271 AIR COLD SUPPLY INC. _ _ _ _ S656.55 _ ELECTRONIC PARTS/PUMP
086272 AL6RIRDAS STROFUS 5500.00 REFUND/ENGINEERING
CBE273 ALL-STATE VEHICLES. INC. S7.356.21 VEHICLE LEASE
086.274 ALLIED CORPORATION $33,435.32 CATIONIC POLYMER
C86275 ALLIED SUPPLY CO. S1.657.52 PLUMBING S PIPE
006276 ALL PURE CHEPICAL $41,291.57 CHLORINE
08E277 AMERICAN AIR FILTER. INC. _ Al .271.64 MECHANICAL SUPPLIES
066278 AMERICAN SCIENTIFIC PRODUCTS 5206.56 LAB SUPPLIES
066279 AMER. SOCIETY OF SAFETY ENGR. f24.GC PUBLICATION
_ 986280 AMERITECH S135.68 COPIER SUPPLIES
S66261 ANAHEIM MINDING. INC. $2,083.94 ELECTRIC METER REPAIR
086282 THE ANCHOR PACKING CO. 5531.91 MECHANICAL f PLUMBING SUPPLIES
C862E3-___ .. AQUA BEN_,CORP.__ _ ._ fS..7b0.29..._ . _. _ .._. _ ANINOIC POLYMER_„_,_
_ 986264 ARTESIA SAWDUST PRODUCTS. INC. S7.791.00 SAWDUST
:. 086285 FALCON DISPOSAL SERVICE $27,913.45 GRIT REMOVAL
862 B. BAT
_. ._ ..._. . .. _...._. $550.00 DEFERRED COM
PENSATION
XC86287 BEECH STREET EMPLOYEE FEkFIT 5711.66 PPO CHARGE
.86280 pEN2 ENGINEERING. INC. f29.60 MECHANICAL _
SUPPLIES
OBE 289. J S N_ BERG ....I NC._ 3q 1.67 _ __.___._ . LAB SUPPLIES ._ .
�:130.� 8629 BLACK f MENDED MPG. CO. $ 92. 3 TOOL REPAID
C
86291 BLUE DIAMOND MATERIALS CONCRETE i C86292 INC. $BRA COMMUNICATIONS, IN . .. .. .. _. S81.50 _ SAFETY VIDEOS
_Cb D86293 BOLSA RADIATOR SERVICE $410.68 AUTOMOTIVE REPAIRS
C8629A BRITHINEE ELECTRIC $91.4? ELECTRONIC SUPPLIES
C 295.. ... JUDY BUCKER 232.7.66,-_ . ., ._._._. . EMPLOYEE TRAVEL EXPENSE
066296 WILLIAM H. EUTLER S1.420.01 PETTY CASH - - - "-
086297 C L R RECONDITIONING CO. S190.00 COMPRESSOR REPAIR
OB6298 CPT CALIFORNIA. INC. .. . .. $39.33 PRINTWHEEL
086299 CAL-GLASS FOR RESEARCH. INC. $1, 388.87 LAB SUPPLIES
v
086390 CALTROL . INC. SB5.50 MECHANICAL SUPPLIES
586381.. CALLF08NIA CONTPOLS.-CO,._ 52.3.49 .. _ REPAIR PARTS
CB63O2 EARL ETON ENGINEERS $2.314.24 CONTRACT SERVICE
066313 JOHN CAROLLO ENGINEERS S55,854.23 ENGINEERING SERVICES PI-20
086305 CJOHNENT CAROLLO ENGINEERS 513.675.10 ENGINEERING SERVICES PI-22.P1-21,P1-29.J-6-
086.305 CENTEL SYSTEMS 38.999.95 SERVICE AGREEMENT
OB6306 CHURCE ST INDU57R IFS♦ INC. fS8.999.95 FERRIC CHLORIDE
0863:7_. CHURCH NEUVATEBING..,INf. ;2E2.00.00 _._...__._. ENGINEERING 5-19-R3
_ 086309 COAST PNEUP RTICS S60.67 AUTOMOTIVE PARTS
886310 CALE-P AR MER INSiPUkE NT CO. 190.80 LAB SUPPLIES
086310 CAL MAT $190.00 CEMENT
086311 CONSOLIDATED ELECTRICAL DIST. $7,729.10 ELECTRICAL SUPPLIES
086312 CONSOLIDATED REPROGRAPHICS S8.030.89 PRINTING
_.._.G86313 CONTINENTAL AIR TOOLS., INC..__._ ..__...._ T152.C4... _... . _ _ _ TOOL REPAIR
86315 CONTROL DATA CORPORATION $9.224.40 INSTRUMENT REPAIR
386315
B6315 CONTROL CO s1024.21 ELECTRICAL EQUIPMENT
086316 COUNTY WHOLESALE ELECTRIC $1.427.51 ELECTRICAL SUPPLIES
c:
FUND NO 9I^9 - JT CIST WORKING CAf iiAl REPORT
DATE 5/23/67 f'AGF.
REPORT NUMBER Af 43 _
' COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
CLAIMS PAID 05/27/87
WARRANT N0. VFNGOP AMOUNT DESCRIPTION
OBE317 CAL PATER S101.50 LEASE
086318 CUSTGNIZE0 PERSONNEL LTD. S1.842.75 TEMPORARY
_
_ 096319 STATE OF CALIFORNIA S13.488.49 DIESEL USE TAX
086320 DME. INC. 11.342.49 MECHANICAL PARTS
066321 DAILY PILOT S79.60 NEWSPAPER ADS
_ 08f322 DANIELS TIRE SFRVICE $685.46 AUTOMOTIVE SUPPLIES
78E323 CEtb S642.78 AUTOMOTIVE PARTS
086324 CIFILIPPO ASSOCIATES S429.33 OFFICE SUPPLIES
_ 086325 CIGITAL EGUIPMER7 CORP. S192.06 SERVICE AGREEMENT
_ COE326 DIRECT SAFETY CO. $252.32 SAFETY SUPPLIES
_ 086327 CORAEO ENTERFRISES. INC. $7,134.00 CONTRACT SERVICES
086328 DUNN EDWAPDS CORP. S669.06 HARDWARE
086329 OILEER EADS $115.00 DEFERRED COMPENSATION
:'. 586330 EASTMAN. INC. $991.94 OFFICE SUPPLIES
_ OF6331 ENCHANTER. INC. 53.500.00 LAB SERVICES
_ 086332 FACTORY REPRESENTATIVE. INC. S346.34 INSTRUMENTATION
M 066333 PARSF.ALL FAIRRES $345.40 DEFERRED COMPENSATION
PBE334 FEDERAL ENERGY REGULATORY COMMISSION 51.400.G0 CENTRAL POWER PLT-I PERMIT APPLICATION
• _ _ 086335 FEDERAL ENERGY REGULATORY_COMMISSION _ $1.400.80 CENTRAL POWER PLT-2 PERMIT APPLICATION
. Y 086336 FISCMER G PORTER CO. 53.9l1 dq PLOMBING 6 PIPE
086337 FISHCR SCIENTIFIC CO. 11.650:15 APPLIANCE
-1 OB6338 FLO-SYSTEMS $594.66 PUMP PART
_cp 086339 THE FOXBORO COMPANY $668.63 ELECTRONIC PARTS
I 086340 FRANCE COMPRESSOR PRODUCT 3671.69 MACHINE PARTS _
086341 FREOCRICK PUMP L ENG7NEERIN6.______. _ . _ „33r621.43 PUMP
_ 086342 FRICTION MATERIAL CO. SI81.73 AUTOMOTIVE PARTS
086343 FROST ENGINEERING SERVICES CO. $293.39 INSTRUMENT PARTS
C86344 F G L ENVIRONMENTAL SSO.DO LAB SERVICES
GBE345 GENERAL TELEPHONE CO. S5.732.51 TELEPHONE
006346 TOP. GERLINGER $113.07 EMPLOYEE MILEAGE
_-----.086347 GIERLICH-NITCHELL. ,INC... $23.111.40 CONTRACT SERVICES
08E348 W.Y. GRAINGER. INC. -_- - $73.97 ELECTRIC PARTS
08E349 HACH COMPANY S1.095.49 LAB SUPPLIES
_ 0EE350 V. NAM6LIN S10.92 EMPLOYEE MILEAGE
_ 086351 FRED A. HARPER $1.275.G0 DEFERRED COMPENSATION
066--52 HARFINGTON INDUSTRIAL PLASTICS S373.26 AUTOMOTIVE PARTS
• _. _,_ 06E!53 MATCh S KIRK, INC. .. S304.22 MECHANICAL SUPPLIES
_ 05054 HODGSON ELECTRIC $1.925.30 CONTRACT SERVICES
_ 006355 hOERBIGER C.V.S. CALIF. . INC. $2,662.02 COMPRESSOR PARTS
086356 PONEYYELL• INC. 1461.94 STRIP CHARTS
_ G86357 LISA HOOTON 130.87 EMPLOYEE MILEAGE
_ C66350 R.S. HUGHES CO.. INC. $137.31 PAINT SUPPLIES
_. O0E359 CITY OF HUNTINGTON REACH ,. _ $171.84 WATER USEAGE
_ D8E369 HUNTINGTON BEACH RUBBER STAMP S994.28 OFFICE SUPPLIES
086361 HUNTINGTON SUPPLY $21.03 HARDWARE
086562 ISCO COMPANY S2.299.00 INDUSTRIAL WASTE EQUIPMENT
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/23/87 FADE _
REPORT NUMBER AP43.. _.
_ CPUNTT SANILTI DFSTR OF ORANGE COUNTY
CLAIMS IMS MS PAID D5/2 05/27/P7
WARRANT NO. VENDOR AMOUNT DESCRIPTION
_086363 IMPERIAL WEST CHEMICAL F5,593.35 FERROUS CHLORIDE
_ 086364 INDUSTRIAL THRFAOEO PRODUCTS $555.43 HARDWARE
_ 0863E5 INLAND EMPIRE EQUIPMENT CO. $164.32 AUTOMOTIVE PARTS
086566 INVIpE RANCP WATER DISTRICT $29.01 WATER USEAGE
C6E3E7 ELENK P. JAPESON $3,753.06 ENGINEERING SERVICES
_ 086366 RIVIERA FINANCE S654.19 JANITORIAL SUPPLIES
C86365 JEROME INSTRUMENT CORP. _ S19r275.00 ANALYZER
_ 086376 KAMAN 6EAPINGS S SUFPLY $26.33 MECHANICAL PARTS
086371 KING 9EARING9 INC. $4.589.53 MECHANICAL PARTS
__ 086372 DONALD E. KINNEY 5829.00 DEFERRED COMPENSATION
OB6373 HIRST PUMP p MACHINE WORKS 14,388.43 PUMP PARTS
086371 L.O.W.S., INC. S215.43 REPAIR MATERIALS
T_ 086375. LANE-MERRITT ..._-_f203.96. .._. _..._ LAB SERVICES
_ 086376 LEWIS PUBLISHE6S• INC. S79.95 PUBLICATION
_ C86377 LIFECOM-SAFETY SERVICE SUPPLY S44.92 SAFETY SUPPLIES
086378 LIGHTING DISTRIBUTORS, INC. _ _ S376.27 LIGHTING MATERIALS _
C86379 M.G. INDUSTRIES 41,350.98 MISCELLANEOUS OPERATING SUPPLIES
m C86380 MALCON PIRATE, INC. $3.754.05 ODOR CONTROL SERVICES
-X
X 08638,1 MARINE. 6 VALVE SUPPLT_ S1,674.60, PLUMBING 6 PIPES
_� GBE 382 NRFV pC ELECTRONICS $134.09 ELECTRONIC SUPPLIES
OBE383 MATT - CHLOR. INC. $496.14 PLUMBING 6 PIPES
-1_ 08E384 MCMASTER-CARR SUPPLY CO. __.. ._.. _. _ S369.78 CHAIN
086!R5 MESA CONSOLIDATED WATER $6.06 WATER USEAGE
. OB63P6 PINE SAFETY APPLIANCES CC. S138.22 SAFETY SUPPLIES
MICHAEL 0. MOOFE-----._ _.__ . _- ._._ .__1268.21. _. EMPLOYEE TRAVEL EXPENSE
086388 MOORE 6 TABEP S12,246.06 GENERAL REPAIR
_ 08E389 MOTION INDUSTRIES. INC. $77.08 MECHANICAL PARTS
^u 86390 NATIONAL SANITARY SUPPLY. $415.63 JANITORIAL SUPPLIES
086391 NEAL SUPPLY CO. - $293.65 INSTRUMENT PARTS
086392 C.M.S. $1,330.90 TRASH REMOVAL
_08.(293__.- . OCCIDENTAL CHEMICAL._COFP..______..____._ _..___. _34.058.58 ..__ _ .__._ _ CAUSTIC SODA
_ 086391 OH AUS SCALE CORP. 5313.U6 INSTRUMENT REPAIR
086395 ORANGE COAST ELECTRIC SUPPLY $1,415.69 ELECTRONIC PARTS
086396 ORANGE COUNTY CHEMICAL CO. S953.43 HYDROCHLORIC ACID
_ 086397 ORANGE COUNTY WFOLESALE S369.94 ELECTRIC SUPPLIES
UBE398 ORANGE VALVE C FITTING CO. S638.6B PLUMBING s PIPES
086410 .. ORITES COPPSANI __. . ___.._...__. _ .f1r$87.40 _. .._ _ _. DEFERRED
RNI ALREDC WARTS
0864CI COUNTY SANITATION DISTRICT SB7.40 DEFERRED COMPENSATION
0864t1 COUNTY SANITATION DISTRICT 51,376.70 WORKER'S COMPENSATION REIMBURSEMENT
086402 PACIFIC SAFETY EQUIPMENT CO. SI,349.44 SAFETY SUPPLIES
_ 086433 PACIFIC BELL S6S3.51 TELEPHONE
C66434 PAK WEST S157.43 HARDWARE
C864C5 . . FARTS UNLIMITED _E1.B68.55. .. . ._.__... _.__ _.. AUTOMOTIVE PARTS,
0864JS CHARLES PASINLI S13.78 EMPLOYEE BILEAGE
_ 06E40 FATA'S SHOP $995.00 CONSTRUCTION
_.. _ D86408 ROY PENDERGRAFT S445.00 DEFERRED COMPENSATION
F
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 5/23/87 PAGE 4l.
.... ..... . . .......... REPORT NUMBER AP43
COUNTY SANITATION OISTRHTS OF ORANGE COUNTY
05/2 CLAIMS PAID OS/27/P7
WARRANT NO. VENDOR AMOUNT OCSCP.IPTION
0864J5 PHILLIPS ELECTRONICS $77.49 PUBLICATION
066410 FOLY ENTERPRISES. INC. $276.66 SAFETY SUPPLIES -
086411 POLYMER PIPING L MATEPIASLS 5164.74 FIRE GMT
086412 HAROLD PRIMP.OSE ICE $30.36 ICE
OSE413 PROCESS COMPONENTS CO..INC. $353.62 OXYGEN PARTS
G86414 THE PROJECTS SOLUTIONS CO. $9,273.60 CONTRACT SERVICES
C86115 PAFFEPTY 1147CONATIONAL TRUCKS 960.57 TRUCK PARTS
086416 THE REGISTER. LEGAL 51l."C4F Sb64.32 LEGAL NOTICE
086417 REMECY TEMA 54,594.4E TEMPORARY SERVICES
056418 THE REPUBLIC SUPPLY CO. 5151.37 PLUMBING 6 PIPE
066419 RICHARDS, WATSON. OPEYFVSS $845.23 LEGAL SERVICES
_ 08642C RICOH CORPORATION $216.78 PRINTING 6 PUBLISHING
086421 ROLIKSON FERTILIZER CO. _ _ $3,160.13 CHEMICALS
_ 086422 PORKE DATA SUPPLY. INC. $198.24 DISK PACK
O8E423 JOSEFH T. RYERSON It SON. INC. 5174.96 METAL
m, 086424 LEN SCHOLL A CO., INC. 5646.66 VIDEO SUPPLIES
SOB6425 SEA COAST DESIGNS $422.94 OFFICE FURNITURE
086426 SHAMROCK SUPPLY $175.54 COOLERS
trL_ 086427 SHEPHERO MACHINERY CO. _... _ 51,316.52 AUTOMOTIVE PARTS _
.-: 08E428 - SKYPARK VALK-IN MEDICAL CLINIC 5590.50 PHYSICAL EXAMS
"I 086429 SMITH-EMERY CO. $424.30 CONTRACT SERVICES
p0 086430 SOUTHERN CALIF. EDISON CO. 5323,323.96 POWER
1� 0864.1 SO. CAL. GAS Ln. 124.511.23 NATURAL GAS
C86432 S0. CALIF. IRANE SERVICE $148.98 ELECTRIC PARTS
68F433 SO. CALIF. WATER CO. $20.71 WATER USEAGE
086434 SOUTHERN COUNTIES OIL CO. $20.930.83 TRUCK PARTS/DIESEL FUEL
686435 SOUTHERN PARTS $13.299.48 COMPRESSOR PARTS
C86436 SPARKLETTS DRINKING W,TEP $1,199.T2 DRINKING WATER
_ O66437 SPEEDE SPEEDOMETER $129.50 DRIVER/VEHICLE PROFILE REPORT
OB6438 STAR TOOL t SUPPLY CO. 51 ,052.07 TOOLS
006439 „ THE SUPPLIERS _ , . _ _ _ _, . 5795.23 SAFETY/TOOL SUPPLIES
_ OBE440 SURVEYORS SERVICE CO. 5430.7E TOOLS
_ 086441 THERPOLYNE CORP $228.00 INSTRUMENT PARTS
886a42 TRAVEL TRAVEL $436.00 TRAVEL SERVICES
066443 N.O. TPERICE CO. $296.74 AUTOMOTIVE PARTS
_ 0E6444 TRUCK 6 AUTO SUFFLY, INC. 51,024.22 AUTOMOTIVE PARTS/REPAIRS
086445 J.G. TUCKER t SON. INC. 5651.99 INSTRUMENT PARTS/REPAIRS
_ 036446 UMA ENINEERIN6, INC. $6,309.50 CONTRACT SERVICES 5-26
_ 086447 UNITED PARCEL SERVICE $320.85 FREIGHT
086448 UNIVERSAL PACK $114.38 AUTOMOTIVE PARTS
_ C86s49 VWR SCIENTIFIC 5968.79 LAB SUPPLIES
086450 VALLEY CITIES SUPPLY CO. 53.167.68 PLUMBING 6 PIPES
086451 VAN WATER t P06ERS 1111898.50 HYDROGEN PEROXIDE/OMLORINE
086452 VEHICLE SPRING SERVICE S15O.00 AUTOMOTIVE PARTS
C86453 VERTEX BUSSINESS INTERIORS $74.94 OFFICE FURNITURE
G86154 WALLACE t TIERNAN 94-37.05 INSTRUMENT REPAIR
ui
u
FUND NO 9119 - JT LIST WORKING CAPITAL PROCESSING DATE 5/23/67 PAGE
.. . . __._. _. .___. _. REPORT NUMBER _AP43
COUNTY BANDCLAIMS DISTRICTS OF OP.A NGE COUNTY
CLAIMS PAID 05/27/87
WARRANT 140. VENDOR AMOUNT DESCRIPTION
.- 066455 CA-L WARRED: S CO. _ _ _ S69.60 _ CLAIMS ADMINISTRATION SERVICES
08E456 YAPR ING TON 1123.40 LAB REPAIRS
086457 YESTEPN STATE CHEMICAL SUFFLY $9.213.05 CAUSTIC SODA
086458 WILLDAN ASSOCIATES ST.189.35 ENGINEERING SERVICES-DIST 2 MASTER PLAN
086459 XEROX CORR. *623.53 PRINTING SUPPLIES
OSE460 GE04GE YARDLEY ASSOCIATES SI.G37.82 OXYGEN VALVE REPAIRS
084461 MORRIS TING $37.38 EMPLOYEE MILEAGE
086462 21P TEMPORARY PERSONNEL 538L.67 PERSONNEL SERVICES
086463 JOHN RANEL S321.42 DIRECTORS COMPENSATION
086464 JACK KELLY $825.20 DIRECTORS COMPENSATION
086465 PNILIP MAURER S325.20 DIRECTORS COMPENSATION
086466 JAMES NEAL S1.215.12 DIRECTORS COMPENSATION
_. 086467__. ROGER P. STANTON,_ _S813.49 _ DIRECTORS COMPENSATION
086468 GRACE WINCFELL $3.15 DIRECTORS COMPENSATION
-----------------
T DTAL ELA]N3 PAID 0'_/£7/87 ==z=74.45
ITT --
-_ 086465 - - RIVERSIDE CEMENT CO. $562,500100 -- _ BOX CREDITS - - _-
py 08470 DON GRIFFIN 3,466.64 DIRECTORS COMPENSATION
5 53 T6-.U- _
CA SUMMARY AMOUNT
I
_�..__-_. _.. _.
it AGO iUND $-270.30 _._ ._.
92 OPER FUND 12,497.05
.. /2 ACO FUND 7,686.60
-_ - 93 OPEN FUND - 12,816.69
/5 OPER FUND 5,999.53
/5 ACD. FUND . __ . 6,837.43
/7 OPER FUND -.. 1.192.61
B11 OPER FUND 4,406.64
_ .._. . /14 OREM FUND ._ _ 29.01
/566 OPER FUND 636.00
/566 ACO FUND 2,329.28
0697 OPER FUND 34.81 _
.. 07914 OPER FUND 120.26__-.___.. ._.
JT ODER FUND 640,933.26
CORE _. 755,722.43
_ SELF FUNDED WORKER COMP INSURANCE FUND 2.148.96
JT WORKING CAPITAL 78,410.23
r $1y532,071.09
BOARDS OF DIRECTORS
County Sanitation Districts Post Office Box 8127
of Orange County, California 10844 Ellis Avenue
Fountain Valley, Calif., 92708
Telephones:
Aroa Coda 714
JOINT BOARDS 9540-291
62-2411
AGENDA
WEDNESDAY, JULY 8, 1987 - 7:30 P.M.
RE: AGENDA ITEM NO. 4
Resolution No. 3698 has been received from the City of Seal Beach,
as set forth below. Pursuant to Regular Agenda Item No. 4 , it is
appropriate to receive and file said resolution.
DISTRICT 3
(4) (a) Consideration of motion to receive and file Resolution
No. 3698 adopted by the City of Seal Beach re election
of mayor, appointment of alternate Director, and seating
a new member of the Board, as follows: ( *Mayor)
District Active Director Alternate Director
3 Edna Wilson* Frank Clift
MEETING DATE July S. 1987 TIME 7:30 om DIsTRIcis 1,2.3.5.6.7. 11, 13 6 16
DISTRICT 1 JOINT BOARDS
(EDGAR)........HOESTEREY... ✓ (PICKLER)..........BAY......... ✓
(CRANK)........HANSON....... (FRIED)............BIGONGER....
(YOUNG)........GRISET......,GI (NORBY)............CATLIN......JC
(RUTH).........STANTON.....JG (PLUMBER)..........COX...........
(PERRY)............CULVER......JC
DISTRICT 2 M� (KENNEDY)....... . EDGAR..........
.J�CC
(MC CUNE)..... . GRIFFIN
(NRBY)...... CATLINY..... (YOUNG)....... ....GRISET......
(WEDEL)..... ..MNONE (CRANK
)......... ..HANSON......
(PICKLER)......BAY (COX)..............HART........
(FRIED)..... _
(EDGAR)............HOE5TERET...J�
(YOUNG)........GRISET....... _ (CORONADO).........KANEL.......JC
(NELSON).......LETTON......JC (MINCHELL).........N___........ ✓
(SCOTT)........NEAL........ ✓ (EDGAR)............KENNEOY.....?�_
(DOWNEY).......NEWTON......� (NELSON)...........LEYTON......JC�
(CULVER).......PERRY....... V (MEDEL)............NAHONEY.....
y,�_
(FASSENDER)....SILZEL......JL� _ (PLUMBER)..........MIAURER......JL
(PEREZ)........SMITH.......yC )(_ _ (GREEN. P).........MAYOS........JL_
(ROTH).,.......STANTON.....JC4 _ (AGRAN)............MILLER. S...JL
(BIGONGER).........MURPHY......yG
DISTRICT 3 (SCOTT)............MEAL..........
(SUTTON)...........NELSON......
(HERMAN).......POLIS ... (DOWNEY)...........NEMTON...... _
(WEISHAUPT)....SAPIEN...... (CULVER)...........PERRY.......
(PICKLER)......SAY........._ (XERMIINI...........POLIS.......
(NORBY)......:.CATLIN......JG � (STANTON)..........ROIN.........K
(PERRY)..... . 00.YER...... _ (MEISHAUPT)........SPIEN......Je—
(MC CURE)......GRIFFIN..... (MILES)............SIEFEN......JG
(YOUNG)...... GRISET (FASBENDER)........SILZEL......JL
_
(CORONADO).. ..KANEL..... ±L (PEREZ)............SMITH.......1L
(MINCHELL)....
NEbbK,....
..yG (ROTH).............STANTON......L
(MEDEL)........MAHONEY..... L (NELSON)...........5UTTON...
... _
(SCOTT)........NEAL........JL � — (MILLER. D)........SMAN........ _
(SUTTON).......NELSON......✓ (BERNAL)...........SYLVIA...... _
(WILES)........SIEFEN......_L ± _ (GREEN,H/OOHNSON)..WAHNER.....•
(ROTH).........STANTON.....yL � _ (CLIFT)............WILSON......�L
(BERNAL).......SYLVIA.......
(CLIFT)........WILSON......y�
DISTRICT 5 HAM: SYLVESTER...✓
CLARKE......yj
(COX)..........HART........ DAWES.......JL
(PLUMMER)......COX......... ANDERSON....�
(STANTON)......ROTH......... BUTLER.......
BROWN........✓
DISTRICT 6 KYLE........
VON LANGEN L
(JOHNSON)......MAHNER......�L WINSOR......✓
(PLUMNER)......MAURER......y„G STREED......J!
(STANTON)......ROTH......... CLAWSON.....
DOTEN.......JC
DISTRICT 7 LINDER......J�
DEBLIEUX.—.&.&�
(KENNEDY)......EDGAR....... ✓ Y _ TALEBI......
(ABRAM).......:MILLER• 5...� ROLL........
(PLUMBER)......COX......... # —_
(YOUNG)........GRISE7......
—� �,�p� �
(STANTON)......ROTH......... ¢R •----5
(PEREZ)........SMITH....... ✓ ✓
(GREEN. H).....MANNER......� OTHERS: WOODRUFF....
�— ATKINS.....
DISTRICT 11 HOHENER.....
HOWARD......�
(MINCHELL).....KBbWVs...... ✓ HUNT........
(GREEN. P).....MAYS........7 KEITH.......
(ROTH).........STANTON.....LZ KNOPF.........
LINDSTROM..._
DISTRICT 13 LYNCH.......
(NELSON)....
.. UTTON YOUNG..M........
(BIGONOER)......NSURPHYt}},y'r's.� QA...Q ..R.
(PICKLER)......BAY.
(STANTON)......ROTH........JG
(PEREZ)........SMITH.......JC
DISTRICT li ti 1
(ABRAM)........MILLER. 5...
(MILLER. D)....SWAN........1G
(EDGARI.:......KENNEDY.....yJ (I_._ }, � L^.•, ,
(STANTON)......ROTX........_
(PEREZ)........SMITH........
07/OB/87
PLEASE SIGN IN - JULY 8, 1987
NAME AGENCY/COMPANY
o
_see
GC - - aC5 -c>
�d l-roc�g25 `�
C 55DOC )
� � U � 15--
JULY 8, 1987 JOINT MEETING NOTES
#6(a) - Report of Joint Chairman
Chairman Griffin cemented that this was his last meeting as Joint Chairman and
wanted to take an opportunity to say some things and give an overview of the
last two years.
He said we have been quite busy and have done quite a bit but there is still a
lot to do. One of the most important resources has to do with what makes this
organization possible. We have a tremendous resource in individual people. He
thanked each Board member who has participated and been involved in putting
together policies. Thanked the Vice Joint Chairman, Don Smith, for his
cooperation, assistance and guidance. Also thanked the immediate past Joint
Chairman, Dick Edgar, for his tremendous assistance and guidance. He then
thanked the General Manager's staff, particularly and specifically, Tom Dawes,
Gary Streed, Bill Clarke, Bill Butler, Blake Anderson, and Rita Brown and their
secret weapon, June Steffan. Added that we have the finest staff. Thanked Tom
Woodruff, General Counsel, who is always there and keeps us on target.
He cemented further that staff has utilized fine consultants. He said he has
gained a great deal of appreciation for many of the consultants that assist the
Districts.
Lastly, he said he wanted to recognize a special guy. Said the Districts were
very fortunate to have a General Manager like Wayne Sylvester. Said he thought
Wayne was unique and absolutely outstanding and tops. Thought this organization
was very fortunate to have a person like him with his ability, patience and
integrity. is just superior. Thanked him very much.
Don then offered his congratulations to the new leadership and assured his
continued support. Also thanked all of the Directors. Said he has enjoyed
being Joint Chairman. Noted that we have made progress and wished the Districts
continued success.
He then reviewed 1985-86 and 1986-87 accomplishments. SEE ATTACHED REPORT.
#6(b) - Report of the General Manager
The General Manager stated that he would like to express his appreciation to Don
Griffin for his kind cements. He added that he didn't think all of the
Directors really appreciated the amount of time and effort the Joint Chairman
has to put in on the Districts' behalf—talking on the phone almost daily and he
is in the office 60-70 days a year. He added that it really has been a
pleasure working with Don. Think he has done an outstanding job. The things
that the Districts and the staff are able to accomplish a only possible
because of the support and interest and participation of each and every one of
our Directors. Wh are only as good as our Board is, and we think we have the
finest Board around.
Wayne Sylvester then reported that over the last few years, we have discussed
ocean disposal issues with the Select Advisory Committee. Policies and
procedures reviewed include renewal of our NPDPS Permit waiver which expires in
1990 and the proposed research project which was included in the Clean Water Act
this year when it was passed. Much of the clean water problem steno from
problems in Santa Monica Bay. As part of our public information program we have
put together a video which we hope will address two key questions: (1) Are the
fish caught safe to eat? (2) Is it safe to swim in the ocean? A 20-minute
video was then shown to the Board. The General Manager advised that this film
was available in 3/4" and 1/2" for the Directors' use. Just contact him and he
would make it available and staff would be happy to make formal presentation
also. He then added that Corinne Clawson, the Districts' Public Information
Officer, deserved the credit for putting the film together.
#7 - Election of Joint Chairman
The General Counsel advised that the election will be determiner] by a vote cast
by each District. Each District will caucus and determine which candidate they
will vote for and will cast a single ballot. After the Joint Chairmen is
selected, nominations will be open for Vice Joint Chairman.
Called for additional nominations for Joint Chairman. There were none. It was
then moved and seconded that nominations be closed. Voice vote. A unanimous
ballot was cast for Dan Smith as Joint Chairman.
Chairman Smith then thanked the Directors for the vote of confidence they had in
him. He said he had a big job to follow a Joint Chairman like Don Griffin. He
added that he had been through a lot of Chairmanships and would try to uphold
the position of Joint Chairman. He also conmantal that he was on the Board back
when they built the outfall. Are some real stories about that. The cost at
that time was about $10 million. Had a lawsuit over it also. He also referred
to the statement he mailed out with the agenda material and said he wouldn't go
through it but he had been around a while. Thanked staff for all their help
during the last year.
Mr. Smith then presented a plaque to the outgoing Joint Chairmen, Don Griffin,
expressing the Boards' appreciation for his services over the last two years.
#8 - Election of Vice Joint Chairman
Nominations were declared open for Vice Joint Chairman.
Director Catlin nominated John Sutton from Brea and commented that he sits on
the Fiscal Policy Committee, Stringfellow Committee, League of California
Cities, is Chairman of District 13 and is on Executive Committee.
Director Sapien then nominated Richard Polis who is Chairmen of District 3 and a
member of the Executive Committee.
It was moved that nominations be closed. Voice vote. Motion carried.
The Districts then caucussed from 8:27 to 8:45 and then turned in their votes to
the canvassing committee appointed by the General Counsel, which included
Director Norm Culver, Rita Brown and the General Counsel. Following the tally,
the Joint Chairman announced that Director John Sutton had been elected Vice
Joint Chairman.
#8(a) - Election of District 13 Chairman & Chairman pro tem
The Joint Chairman advised that it would now be necessary to elect a new
Chairman of District No. 13 to replace John Sutton. Todd 6hirphy was then
nominated and elected Chairman.
Inasmuch as Todd Murphy was the Chairman pro tem of District 13, it was
necessary to then elect a new Chairmen pro tan. Director Ben Bay was then
nominated and elected Chairman pro tan.
#37(c) - DISTRICT 7
At the request of the General Counsel, the District 7 Board convened in closed
session at 8:55 p.m. to discussms possible eminent domain proceedings.
-2-
The General Counsel reported on easements required in order to construct the
North Airport Diversion Sewer and the South Airport Diversion Sewer to
accommodate the County's schedule for expansion of John Wayne Airport. He
reported on negotiations with The Irvine Company and Parker Hannifin
Corporation. The sewer lines will not interfere with buildings but will be
..i cutting through parking lots. The Irvine Company had indicated they would give
us a Grant of Easement and had requested $40,000 for approximately 1/4 acre.
Have not signed an agreement yet. Parker Hannifin has not indicated that they
will be requesting any compensation. Ws have agreed to box some trees that are
being removed on their property. They are entitled to cagoensation but we have
been successful in the past in getting dedications at no cost. The tenants on
The Irvine Company property (Business Center Drive IV which is Jamboree
Properties and Reinhold Fowler) have expressed some concerns.
The project is ready to go and will take several months to build. Have a
deadline of April because the County is going to break ground and start
construction of the new terminal. We don't have time to delay. If it turns out
we can't get easements, may have to take land by condemnation.
Mr. Woodruff suggested that the Board adopt a resolution setting a hearing date
and giving notice of intent to convene for the purpose of adopting a resolution
of condemnation so we don't have to wait another month. Should consider
$100,000 to be used for purpose of right-of-way just so we can negotiate. Said
he wished he could feel comfortable with that number, but just didn't know haw
much might be needed. If Board grants authority, will allow him to go out and
negotiate.
Director Wahner asked if the price of the project wasn't $600,000? He was told
that was correct.
Sally Anne Miller stated she thought it would be better to [negotiate price
rather than authorize condemnation. She added that one acre in that area at the
moment is $1 million. Said she was concerned about time constraint here. The
County just ordered us to do this one month ago. (She was advised that we were
first advised in December 1986) Asked if County could help us with
negotiations?
Tan Woodruff stated that he thought the chances of using condemnation were very
minimal. Thought the deal would close next week when Parker Hannifin staff
return from out of town. 'Thought things would work out but Board's authority
would be used just as a backup. If we don't have an answer by the 15th, notice
of hearing should be sent by the 30th.
Director Cox stated that he didn't think we should pay anything.
Director Roth novel that the staff and General Counsel be authorized and
directed to proceed with all vigor to negotiate and if they can't reach an
agreement, should call Directors and get direction by polling Directors on the
phone. Motion seconded by Wahner. (TAW estimated money needed would be
$20,000, $40,000 & $40,000) Roth agreed to add that authorization to pay up to
$100,000 to his motion. Wahner seconded.
Directors Cox and Miller said no, would like to be consulted before spending any
money.
Question was asked if there was any relationship between these fees and
�..i connection fees in the future? Tan Dawes replied that Parker Hannifin's property
is going to be developed and they will probably give us an easement for free.
They will have to pay sewer connection charges later. Will be no development
-3-
on The Irvine Company property. Jamboree Properties is lessee of site but do
not occupy it. Is occupied by National University (??)
A substitute motion was then made by Director Miller to approve the easements
and consent agreement as listed in agenda items 37(c)(1),(2) & (3) removing all
authority for payment for said rights-of-way. Motion seconded and carried by
voice vote.
�..�
-4-
JOINT CHAIRMANS' REPORT
JULY 8, 1987
1. 1985/86 - 1986/87 ACCOMPLISHMENTS
A. DISPOSAL POLICIES AND FACILITIES PLANNING, DESIGN AND.CONSTRUCTION
1. INITIATED COMPREHENSIVE POLICY AND PROCEDURAL REVIEW OF OCEAN DISPOSAL
ISSUES RELATIVE TO RENEWAL OF THE DISTRICTS' 301 (H) NPDES PERMIT AND
THE PROPOSED DEEP OCEAN SLUDGE DISPOSAL RESEARCH PROJECT, THAT WILL BE
BROUGHT BEFORE THE BOARDS IN THE NEXT FEW MONTHS, TO ASSURE CONTINUED
PLANNING FOR THE FUTURE IN A MANNER THAT WILL ADEQUATELY ADDRESS THE
ISSUES IN THE COMMUNITY'S BEST INTERESTS AND ENSURE THAT THE DISTRICTS
CONTINUE THEIR RESPONSIBLE PROGRAM OF BALANCED AND SCIENTIFICALLY-BASED
TOTAL ENVIRONMENTAL MANAGEMENT.
2. FOCUSED ON THE IMPORTANCE OF ONGOING LONG-RANGE FACILITIES PLANNING
INCLUDING:
A. JOINT WORKS TREATMENT AND DISPOSAL FACILITIES MASTER PLAN EIR WAS
CERTIFIED, SETTING FORTH A PROGRAM FOR TREATMENT PLANT IMPROVEMENTS
OVER A 5-10 YEAR PERIOD OF:
INCREASED HYDRAULIC CAPACITY $ 61,421,000
IMPROVED TREATMENT $ 163,025,000
ENVIRONMENTAL ENHANCEMENTS $ 147,029,000
TOTAL $ 279.000.000
B. INITIATED SUPPLEMENTAL EIR FOR JOINT WORKS SUPPORT FACILITIES MASTER
PLANS, INCLUDING:
(1) NEEDED ADDITIONS TO THE ADMINISTRATION BUILDING.
(2) SHOPS, WAREHOUSING, SECURITY & LANDSCAPING AT PLANTS 1 AND 2.
(3) NEW LABORATORY TO PROVIDE NEEDED CAPABILITY FOR EXPANDED
TREATMENT PROCESS AND INDUSTRIAL WASTE MONITORING AND CONTROL,
RESEARCH AND OCEAN MONITORING.
3. INITIATED STUDY AND RECONSIDERATION OF POSSIBLE JOINT OCWD/CSDOC WATER
RECLAMATION FACILITIES IN THE ANAHEIM FOREBAY AREA TO ADDRESS LONGTERM
WATER AND WASTEWATER NEEDS.
4. COMMENCED DESIGN OF TREATMENT PLANT FACILITIES IMPROVEMENTS AND/OR
SUPPORT FACILITIES OF OVER $160 MILLION BY AWARDING ENGINEERING/
ARCHITECTURAL CONTRACTS TOTALING $8.6 MILLION.
-1-
ESTIMATED ENGINEERING
COST OF DESIGN
FACILITIES CONTRACTS
.. 1985-86 $100 MILLION $5.6 MILLION
1986-87 60 MILLION 3.0 MILLION
TOTAL $160 MILLION $8.6 MILLION
5. AWARDED CONTRACTS FOR CONSTRUCTION OF MASTER PLANNED FACILITIES
IMPROVEMENTS AT THE TREATMENT PLANTS TOTALING $96.5 MILLION.
CONSTRUCTION
CONTRACTS
AWARDED
1985-86 $ 28,580,000
1986-87 68,000,000
TOTAL $ 96.580A00
6. CONTINUED TO STUDY AND IMPLEMENT PROGRAMS AND PROJECTS RELATED TO ENERGY
CONSERVATION, OPERATIONAL EFFICIENCIES AND AIR QUALITY EMISSIONS CONTROL
AND IMPROVEMENT, INCLUDING:
A. COMMENCED DESIGN OF $53 MILLION CENTRAL POWER GENERATION AT BOTH
TREATMENT PLANTS WHICH WILL UTILIZE DIGESTER GAS AND SAVE
$4 - 6 MILLION PER YEAR IN ENERGY COSTS AND REDUCE AIR EMISSIONS
BY 60-80%, AND AUTHORIZED ACQUISITION OF NECESSARY AIR EMISSION
CREDITS FOR THE PROJECT.
B. APPROVED A CONTRACT FOR INSTALLATION OF INTERIM CO-GENERATION
FACILITIES TO UTILIZE DIGESTER GAS AND HELP REDUCE AIR EMISSIONS
UNTIL PERMANENT CENTRAL POWER GENERATION FACILITIES ARE CONSTRUCTED
AND OPERATIONAL.
C. ENGAGED SEVERAL CONSULTANTS TO DO AIR QUALITY STUDIES AND MODELING
TO IMPROVE AIR EMISSIONS CONTROL.
D. ENGAGED ENGINEER TO DESIGN LIGHTING ENERGY CONSERVATION PROGRAM AT
THE TREATMENT PLANTS.
7. APPROVED IMPLEMENTATION OF PHYSICAL-CHEMICAL ADVANCED PRIMARY TREATMENT
AT PLANTS 1 AND 2 TO ENHANCE THE QUALITY OF DISTRICTS' TREATED EFFLUENT.
8. COMMENCED DISCUSSIONS WITH CITY OF FOUNTAIN VALLEY RE PLANT NO. 1
FACILITIES IMPROVEMENTS AND EXPANSION RELATIVE TO APPLICABILITY OF
CONDITIONAL USE PERMITS AD EFFECT ON DEVELOPMENT DISCUSSIONS OF THE
OTHER CITIES AND THE COUNTY.
-2-
9. AUTHORIZED APPEAL OF SCAOMD "SHUT-DOWN" CONDITIONS IN DISTRICTS' PERMITS
TO CONSTRUCT AND PERMITS TO OPERATE.
10. REVISED DISTRICT 2 MASTER PLAN TRUNK SEWERS AND CERTIFIED EIR.
B. FINANCING
1. INITIATED STUDIES AND IMPLEMENTATION OF ALTERNATIVE LONG-TERM CAPITAL
FINANCING PROPOSALS INCLUDING:
A. DETERMINATION THAT PRIVATIZATION WAS NOT IN THE BEST INTERESTS OF
THE DISTRICTS AT THIS TIME.
B. INCORPORATED OPTIONS FOR LEASE AND/OR LEASE-PURCHASE ACQUISITIONS
FOR MAJOR EQUIPMENT PROCUREMENTS.
C. SALE OF CERTIFICATES OF PARTICIPATION TOTALING $117.5 MILLION IN
DISTRICTS 1, 2 AND 3 TO TAKE ADVANTAGE OF BENEFITS TO THE DISTRICTS
OF CURRENTLY FAVORABLE TAX LAWS FOR LONG-TERM FINANCING OF
CONSTRUCTION PROJECTS.
D. REVISED CONNECTION FEES IN DISTRICTS 1, 5 AND 6 AND INITIATED REVIEW
OF CONNECTION FEES IN DISTRICTS 3 AND 11.
2. REVISED SUPPLEMENTAL USER FEE PROGRAMS IN DISTRICTS 1 AND S AND
INITIATED PROCESS OF CONSIDERING IMPLEMENTATION OF SUPPLEMENTAL USER
FEES IN DISTRICTS 3 AND 11.
3. ADOPTED FULLY SELF-FUNDED LIABILITY RISK MANAGEMENT PROGRAM.
4. REVISED BOARDS' PURCHASING POLICIES AND PROCEDURES.
5. REVISED BOARDS' POLICIES AND PROCEDURES FOR SELECTION OF ARCHITECTURAL AND
ENGINEERING SERVICES.
6. RECOMMENDED TO ORANGE COUNTY TRANSIT COMMISSION THAT THEY SEEK
ALTERNATIVE FINANCING RATHER THAN A REALLOCATION OF PROPERTY TAXES THAT
WOULD DIVERT TAX MONIES FROM ALL OTHER UNITS OF GOVERNMENT.
C. RESEARCH/MONITORING
1. SELECTED A SCIENTIFIC FIRM TO CONDUCT AN OCEAN RESEARCH AND MONITORING
PROGRAM UNPRECEDENTED IN SCOPE, COSTING APPROXIMATELY $B MILLION OVER A
5-YEAR PERIOD, TO ASSURE PROTECTION OF OUR PRECIOUS COASTAL WATERS.
2. APPROVED PARTICIPATION WITH THE NATIONAL ACADEMY OF SCIENCES TO STUDY
EFFECTIVENESS OF MARINE MONITORING PROGRAMS.
3. MAINTAINED CLOSE INVOLVEMENT IN THE CHANGE OF DIRECTORSHIP OF THE
SOUTHERN CALIFORNIA COASTAL WATER RESEARCH PROJECT AND THE SELECTION OF
THE NEW DIRECTOR; AND APPROVED A REORGANIZATION OF SCCWRP IN CONCEPT
(WHICH 1S STILL PENDING).
-3-
• 4. WERE SUCCESSFUL IN OBTAINING CONGRESSIONAL APPROVAL IN THE FEDERAL
CLEAN WATER ACT RENEWAL FOR THE DISTRICTS' PROPOSED DEEP OCEAN SLUDGE
DISPOSAL RESEARCH PROJECT.
\� D. SLUDGE DISPOSAL
1. CONTINUED PURSUIT OF MULTIPLE LONG-TERM SLUDGE DISPOSAL ALTERNATIVES
INCLUDING:
A. SUBMITTED PROPOSAL TO COUNTY GSA WASTE MANAGEMENT DIVISION RE
LONG-TERM CONTINUATION OF CO-DISPOSAL AT COUNTY LANDFILLS.
B. SEVERAL PRIVATE SECTOR REUSE/DISPOSAL OPTIONS.
C. OFF-SITE CO-COMBUSTION.
D. OFF-SITE MECHANICAL COMPOSTING.
E. DEEP OCEAN SLUDGE DISPOSAL RESEARCH PROJECT. SEE C.4. ABOVE)
E. STAFFING/PERSONNEL
1. CONSIDERED AND RECOMMENDED STAFF ORGANIZATIONAL CHANGES TO ENABLE STAFF
TO BETTER RESPOND TO EVOLVING LEGISLATIVE, REGULATORY AND TECHNICAL
ISSUES AND THE CHANGING DEMANDS ON ADMINISTERING THE DISTRICTS'
ACTIVITIES. (BEFORE THE BOARD ON TONIGHT'S AGENDA)
2. REORGANIZED THE DISTRICTS' SUPERVISORY EMPLOYEE UNIT TO RESPOND TO
RECENT JUDICIAL CHANGE REGARDING EMPLOYEE RELATIONS.
3. IMPLEMENTED MANAGEMENT PERFORMANCE REVIEW PROGRAM (MPRP) FOR MIDDLE
MANAGEMENT EMPLOYEES.
4. EXECUTED TWO-YEAR MEMORANDA OF UNDERSTANDING WITH THE DISTRICTS' FIVE
EMPLOYEE GROUPS.
F. INDUSTRIAL WASTE/GROUNDWATER
1. STEPPED UP ENFORCEMENT OF THE DISTRICTS' INDUSTRIAL WASTE ORDINANCE AND
INITIATED THE FIRST CIVIL COURT ACTIONS AGAINST THREE PERMITTEES AND THE
FIRST CRIMINAL COMPLAINT AGAINST A PERMITTEE FOR VIOLATIONS OF THE
ORDINANCE DISCHARGE LIMITATIONS, AND PHYSICALLY DISCONNECTED ONE PERMITTEE
FROM THE SEWER SYSTEM FOR CONTINUED VIOLATIONS.
2. CO-SPONSORED (WITH THE COUNTY OF ORANGE) THREE TOXIC ROUNDUPS TO
PROVIDE FOR CONVENIENT AND SAFE DISPOSAL OF HOUSEHOLD TOXIC WASTES BY
HOMEOWNERS. THE PROGRAMS HAVE BEEN DETERMINED TO BE THE MOST SUCCESSFUL
IN THE ENTIRE COUNTRY.
3. AUTHORIZED PARTICIPATION WITH THE COUNTY OF ORANGE IN THE COUNTY'S
PROPOSED PERMANENT HOUSEHOLD AND VERY SMALL GENERATORS HAZARDOUS WASTE
COLLECTION PROGRAM.
-4-
4. DECLARED INTENT TO PARTICIPATE IN THE TANNER COMMITTEE PROCESS FOR
PREPARING THE COUNTY'S HAZARDOUS WASTE MANAGEMENT PLAN.
5. ADOPTED POLICY FOR TEMPORARY ACCEPTANCE OF CONTAMINATED GROUNDWATER
(CONSISTENT WITH INDUSTRIAL WASTE ORDINANCE) TO ASSIST IN PROTECTION OF
UNDERGROUND FRESH WATER SUPPLIES.
6. ASSISTED IN THE CLEANING UP THE WORST HAZARDOUS ACCIDENTAL SPILL IN THE
COUNTY'S HISTORY THAT THREATENED THE UPPER NEWPORT DAY ECOSYSTEM PURSUANT
TO THIS POLICY. (SAN DIEGO GAS PIPELINE RUPTURE IN IRVINE, NOVEMBER 1986)
7. COMPLETED A COMPREHENSIVE STUDY, UNPRECEDENTED IN SCOPE, TO IDENTIFY AND
CONTROL PCB'S ENTERING THE DISTRICTS' SEWERAGE SYSTEM.
8. PREVAILED ON THE STATE DEPARTMENT OF HEALTH SERVICES TO CONDUCT A
SPECIAL BRIEFING FOR THE BOARDS REGARDING THE STRINGFELLOW REMEDIAL
INVESTIGATIONS/FEASIBILITY STUDY.
G. ORGANIZATIONAL
1. CERTIFIED THE EIR AND FORMED COUNTY SANITATION DISTRICT NO. 14 TO BETTER
SERVE THE NEEDS OF THE COMMUNITY.
2. ADOPTED A POLICY PERTAINING TO FUTURE AREAS TO BE SERVED BY THE COUNTY
SANITATION DISTRICTS, LIMITING SERVICE TO THOSE AREAS WITHIN THE CURRENT
SPHERE OF INFLUENCE OF THE EXISTING DISTRICTS AND TERRITORY NOW SERVED
UNDER CONTRACT.
3. INITIATED STUDY OF ANNEXATION OF THE 1500 ACRE BOLSA CHICA TO
DISTRICT NO. 11.
4. INITIATED CONSIDERATION OF EXCHANGE OF SERVICE AREAS BETWEEN
DISTRICTS 3 AND 11 TO IMPROVE SERVICE.
5. APPROVED THE ASSUMPTION OF THE ]TH AND 70TH SEWER MAINTENANCE DISTRICT
RESPONSIBILITIES BY THE COUNTY SANITATION DISTRICTS WHICH WILL ELIMINATE
THOSE TWO SPECIAL DISTRICTS AND PROVIDE FOR MORE EFFICIENT SERVICE TO
THE COMMUNITIES INVOLVED.
6. ADOPTED A REVISED JOINT OWNERSHIP, OPERATION AND CONSTRUCTION AGREEMENT
(THE FIRST UPDATE SINCE 1970) UNDER WHICH THE JOINT DISTRICTS ARE
ORGANIZED AND ADMINISTERED.
7. REVISED BOARDS RULES OF PROCEDURES.
8. REVISED THE DIRECTORS' COMPENSATION AND MILEAGE POLICY.
H. PUBLIC INFORMATION
1. COMPLETED FIRST OF FOUR PROPOSED PUBLIC INFORMATION VIDEOS ON DISTRICTS,
ACTIVITIES AND PROGRAMS.
2. PUBLISHED NEW INFORMATIONAL BROCHURE ON THE DISTRICTS.
3. EXPANDED PROGRAM OF PRESENTATIONS TO COMMUNITY INTEREST AND SERVICE GROUPS.
-5-
2) UPCOMING MEETINGS
A. DISTRICT 3 ADJOURNED MEETING: ON WEDNESDAY, JULY 15TH,
AT 7:00 P.M. THE BOARD OF DIRECTORS OF DISTRICT NO. 3
WILL MEET TO REVIEW THE DISTRICT'S LONG-RANGE
FINANCIAL PLAN.
B. SELECT COMMITTEE TO ADVISE THE STAFF: THE SELECT
COMMITTEE TO ADVISE THE STAFF WILL MEET ON THURSDAY,
JULY 16TH AT 5:30 P.M. TO CONTINUE THEIR REVIEW OF
OCEAN ISSUES.
C. EXECUTIVE COMMITTEE - THE EXECUTIVE COMMITTEE WILL
MEET ON WEDNESDAY, JULY 22ND, AT 5:30 P.M.
INVITE TWO OF THE FOLLOWING DIRECTORS TO ATTEND:
TOM MAYS BOB PERRY
AND OR OR
TODD MURPHY SAL SAPIEN
OR
BOB SIEFEN
-6-
COUNTY SANITATION
DISTRICTS NOS. 1, 2, 32 5, 6, 7, 11, 13 AND 14
OF
ORANGE COUNTY, CALIFORNIA
MINUTES OF THE REGULAR MEETING
ON
JULY 8, 1987
Pp1TATIO&
��1 Se Qvalitan QQ�IS�
°P. pi
Siees I95A
O
��RANGE COUN
ADMINISTRATIVE OFFICES
10844 R1,11 AVENUE
FOUNTAIN VALLEY, CALIFORNIA
ROLL ,`mr.r.
A regular meeting of the Boards of Directors of County Sanitation Districts Nos. 1, 2, 3, 5,
6, 7, ll, 13 and 14 of Orange County, California, was held on July 0, 1907, at 7,30 p.m., in the
Districts' Administrative offices. Following the Pledge of Allegiance and invocation the roll
was called and the Secretary reported a quoran present for Districts No,. 1, 2, 3, 5, 6, 7, 11,
13 and 14 as follows:
ACf1VE DDIECTOR.S ALTERNATE DIRMTORS
DISMCf NO. 1: x Ronald B. Hoesterey, Chairman Richard B. Edgar
x Robert Ranson, Chairman pro ten Orma Crank
x Dann Griset Dan Young
x Roger Stanton Don Roth
DISIRICP NO. 2, x A.B. "Buck" Catlin, Chairman Chris Norby
x William D. Fmhoney, Chairman pro tem Dorothy Nadel
=Ben Bay _Iry Pickler
a Roland E. Bigmnger Irwin Fried
-xban Griset Dan Yong
x Gene A. leyton Garrey Nalson
x James Neal George Smtt
-a—Arthur G. Newton Carol DMW
T Bob Perry Norman Culver
x Wayne Silzel' Janes T. Fasbender
xDon Smith Jess Perez
x Roger Stanton Don Roth
DISfRICf NO. 3, x Richard Polis, Chairman harry HMrn
7-Sal Sapien, Chairman pro ten Martha Nalsbaupt
x Ben Bay _Iry Pickler
xA.B. "Buck" Catlin Chris Norby
x Rorman Culver Bob Perry
x Don Griffin hoda J. Me
x Dan Griset DNMcCuneMcCunean Yong
x John Ravel Cornelius M. Coronado
Jack Kelly -7--Gram Winchell
7—William D. Mahoney DorotbY Wedel
z Jaes Neal George Soott
x Garrey Nelson John H. Sutton
x J.R. "Bob" Siefen Deasy Wiles
X Roger.' Stanton Don Roth
x Charles Sylvia Paul Bernal
Edna Wilson —Frank Clift
DISTRICT NO. 5: x Evelyn Hart, Chairman John C. Cox, Jr.
x John C. Cox, Jr., Chairman pro ten =RutbalYn Plummer
X Dm Roth Doges Stanton
DISIRICf NO. 6: x James Wshner, Chairman Eric C. Johnson
-7—Philip Maurer, Chairman pro tem =Dtuthelyn Plummer
x Don Roth Boger Stanton
DISMCf NO. 7: x Richard Edger, Chairman Ursula Remedy
x ea11y Anne Miller, Chairman pro tea Iarry Agnan
x= C. Cox, Jr. Nuthelyn Pl%m er
x Dan Griset Nan Young
x Don Roth —Roger Stanton
x Don Smith Jess Perez
x James Wahner Hury Green
DIS=Cf NO. 11, Jack Kelly, Chairman x Grace Winchell
—Jack
Mays, Chairman pro ten Peter Green
x Roger Stanton Don Roth
DISTRICT PA. 13: X J. ltdd Murphy, Claixman Roland E. Sigmger
x Ban Bay, Chairman Pro ten Iry Pic her
=Don Roth Roger Stanton
x Don Smith Jens Perez .
x John Sutton Carrey Nelson
DISiRICf NO. 14x 2 Sally Anne Miller, Chairman Larry Agran
a Peer A. Swan, Chairman Pro tan =Darryl Miller
�/ x Ursula Remedy _Richard B. Edgar
x Don Roth Roger Stanton
i Don Smith Jess Perez
-2-
07/08/87
STAFF MEMBERS PRESENT: J. Wayne Sylvester, General Manager, Rita
Brown, Board Secretary, Thomas M. Dawes,
Blake Anderson, Bill Butler, William N.
Clarke, Penny Kyle, Rich von Langen, Gary
Streed, Chuck Winsor, Corinne Clawson, John`,
Linder, Bob Ooten, Mike Deblieux, Dan
Dillon, Ed Hodges
OTHERS PRESENT: Thomas L. Woodruff, General Counsel,
Suzanne Atkins, Bill Knopf, Phil Stone,
Jamel Demur, Helen Edgar, Robert Finn,
Director Frank Clift
x x x x x x x x x x x x x
DISTRCCr 3 Moved, seconded and duly carried:
Receive and file resolution of the
City of Seal Beach re Board That Resolution No. 3698 of the City of
appointments Seal Beach re election of mayor,
appointment of alternate Director, and
seating a new menber of the Board, be, and is hereby, received and ordered filed,
as follows: (*Mayor)
District Active Director Alternate Director
3 Edna Wilson* Frank Clift
ALL DISTRICTS Joint Chairman Griffin stated that he
Report of the Joint Chairman would be concluding his Joint
Chairmanship with this meeting and
wanted to express his appreciation for all of the support, cooperation and
assistance he received and thanked each Director, the Vice Joint Chairman (Don E.
Smith) , past Joint Chairman Edgar, the Districts' General Counsel, the General
Manager and staff. Mr. Griffin also offered his congratulations to the incoming
leadership and assured the Board of his continued support.
Chairman Griffin then reviewed an extensive list summarizing many of the
Districts' major accomplishments over the last two years during his term of
office as Joint Chairman in the various categories of wastewater management
policies and facilities planning, design and construction; financial matters;
research and monitoring programs; long-term sludge disposal; staffing and
personnel; industrial waste control and groundwater protection; organizational
improvements; and pubic information programs.
The Joint Chairman than reported that District No. 3 would be adjourning to
Wednesday, July 15th, at 7:00 p.m., to review its long-range financial plan.
Mr. Griffin also announced that the Select Cammittee to Advise the Staff was
scheduled to meet on Thursday, July 16th, at 5:30 p.m., to continue their review
of ocean disposal issues.
The Joint Chairman then called a meeting of the Executive Comnittee for
Wednesday, July 22nd, at 5:30 p.m., and invited Directors Tam Mays and 'Todd --
Murphy to attend and participate in the discussions.
-3-
07/08/87
ALL DISTRICTS The General Manager thanked Chairman
Report of the General Manager Griffin for marks regarding the
Districts' staff and observed the vast
amount of time and effort expended by the Joint Chairman working with staff on
District matters throughout the year. Mr. Sylvester expressed his appreciation to
Mr. Griffin for his dedication and the outstanding job he did as Joint Chairman
and noted that the Districts' many aa:ahplishments are made possible only because
of the interest, dedication and support of the Board manbers.
The General Manager than recalled that over the last few years the staff had been
discussing ocean disposal issues with the Boards and that most recently the
Select Advisory Comnittee had undertaken a cahprehensive policy and procedural
review of ocean discharge matters. Many of the current ocean discharge issues
stem from problems in the Santa Monica Bay. He advised that the staff had
cmhpleted a video as part of the public information effort explaining the
Districts' wastewater management program for protecting Orange County's coastal
waters. This video focuses on and addresses the two key questions: are the fish
caught in the ocean safe to eat? and, is it safe to swim in the ocean? The Board
then viewed the 20-minute video which had been prepared by the Districts' Public
Information Office. Mr. Sylvester indicated that the video was available for the
Directors' use, as wall as for co mhmity service and interest groups, along with
a formal presentation by staff, if desired.
ALL DISTRICTS This being the annual meeting fixed by
Annual Election of Joint Chairman the Boards of Directors for the election
of the Chairman of the Joint
Administrative Organization, the Secretary stated that Don E. Smith had been
nominated at the regular meeting of the Joint Boards on June 10, 1987, in
accordance with established procedures.
There being no other nominations, the vote was polled and the Secretary cast the
unanimous ballot for Director Don E. Smith as Joint Chairman of the Joint
Administrative organization.
Chairman Smith thanked the Directors for the vote of confidence they had
expressed by electing him to the post of Joint Chairman. He camiehted that he
was first seated on the Board in 1968 so had been a m9nber of the Board for many
years. He pledged to do his best to continue to provide the quality of
leadership the Districts have experienced with past Joint Chairmen and to carry
on the Districts' tradition of excellence.
ALL DISTRICTS moaning Joint Chairman, Don E. Smith,
Presentation of plaque to outgoing presented a plaque to outgoing Chairman,
Joint Chairman Griffin Don R. Griffin, expressing the Boards'
appreciation for his dedication,
leadership and outstanding service during his two term as Joint Chairmen.
ALL DISTRICTS This being the annual meeting fixed by
Annual Election of Vice Joint the Boards of Directors for the election
Chairman of the Vice Chairman of the Joint
• Administrative Organization, the Joint
Chairman then called for nominations for the post, whereupon Chairmen John
H. Sutton and Richard T. Polis were nominated.
r -4-
07/08/87
The vote was then polled by written ballot and canvassed by a committee of
Director Norman E. Culver, the General Counsel and the Baird Secretary.
Following the canvass, the Joint Chairmen announced that Director John H. Sutton
had been elected to the post of Vice Chairman of the Joint Administrative
Organization.
Vice Joint Chairman Sutton then thanked the Directors for electing him to the
post.
DISTRICT 13 The Joint Chairmen announced that the
Election of Chairman and Chairmen office of Chairman of County Sanitation
pro tem District No. 13 had been vacated by the
election of Director John H. Sutton to
the post of Vice Joint Chairman and that election of a new Chairman would,
therefore, be in order.
Director J. Todd Murphy was then duly nominated and elected Chairman of District
No. 13.
Joint Chairman Smith then reported that the election of Director Murphy as
Chairman of District No. 13 created a vacancy in the post of Chairman pro tem and
declared nominations in order to fill the vacant position.
Director Ben Bay was then duly nominated and elected Chairmen pro tem of District
No. 13.
DISTRICT 1 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairman ordered
that said minutes be deemed approved, as nailed.
DISTRICT 2 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairman ordered
that said minutes be deemed approved, as nailed.
DISTRICT 3 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairmen ordered
that said minutes be deemed approved, as mailed.
DISTRICT 5 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairman ordered
that said minutes be deemed approved, as mailed.
DISTRICT 6 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairmen ordered
that said minutes bedewed approved, as veiled.
DISTRICT 7 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairman ordered
that said minutes be deemed approved, as nailed. ---
-5-
07/08/87
DISTRICT 11 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairmen ordered
that said minutes be deemed approved, as mailed.
DISTRICT 13 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairman ordered
that said minutes be deemed approved, as mailed.
DISTRICT 14 There being no corrections or amendments
Approval of Minutes to the minutes of the regular meeting
held June 10, 1987, the Chairman ordered
that said minutes be deemed approved, as nailed.
ALL DISTRICTS Moved, seconded and duly carried:
Ratification of payme:t of Joint
and Individual District Claims That payment of Joint and individual
District claims set forth on pages "A" and
"B" attached hereto and made a part of these minutes, and sum arized below, be,
and are hereby, ratified by the respective Boards in the amounts so indicated.
6 10 87 6 24 87
ALL DISTRICTS
Joint Operating F1nd - $ 179,211.17 $ 761,865.85
Capital Outlay Revolving Fund - 1,254,923.04 510,293.98
Joint Working Capital Fund - 44,949.87 109,074.40
Self-Funded Insurance Funds - 7,076.32 2,064.20
DISTRICT NO. 1 - 18.44 1,225.80
DISTRICT NO. 2 - 2,613,356.20 41,339.22
DISTRICT NO. 3 - 3,248.31 12,075.80
DISTRICT NO. 5 - 509,358.52 11,699.90
DISTRICT NO. 6 - 13,367.45 284.56
DISTRICT NO. 7 - 1,996.52 2,465.08
DISTRICT NO. 11 - 202.45 5,702.19
DISTRICT NO. 13 - 18.44 64,890.00
DISTRICT NO. 14 - 20.00 480.00
DISTRICTS NOS. 5 & 6 JOINT - 482,489.20 3,139.80
DISTRICTS N0S. 6 & 7 JOINT - 5,467.36 32.51
DISTRICTS NOS. 7 & 14 JOINT - 1,368.39 4,557.91
$S,ll7,071.68 $1,531,191.20
..J -6-
07/08/87
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing and directing execution
and filing of docamients necessary That the following resolutions
for Federal and State Grants for authorizing and directing execution and
the 1987-88 Joint %brks Inprove- filing of documents necessary for `..�
meats and Additions Federal and State Clean Water Grants and
Loans under 33 U.S.C., 12551 et seg.;
Chapters 12.5, 13, 14 and 15; and Division 7 of the California Water Code, and
providing certain assurances in connection with the 1987-88 Joint Works
Improve ants and Additions, be, and are hereby, adopted by the respective Boards
of Directors:
District No. Resolution No.
1 87-61-1
2 87-62-2
3 87-63-3
5 87-64-5
6 87-65-6
7 87-66-7
11 87-67-11
13 87-68-13
14 87-69-14
ALL DISTRICTS Moved, seconded and duly carried:
Approving Change Order No. 4 to the
plans and specifications re That Change Order No. 4 to the plans and
Job No. PW-061R-1 specifications for Rehabilitation of
Domes and Sludge Pub Mixing Systems for
Digesters 5 and 6 at Reclamation Plant No. 1, Job No. PW-063R-1, authorizing an
addition of $13,967.39 to the contract with Margate Construction, Inc. for sealing
abandoned pipe penetrations, miscellaneous concrete work, piping modifications,
additional piping hangers and supports, and modification of base supports for
digester suction line at both Digesters 5 and 6 to facilitate operation and
maintenance, be, and is hereby, approved.
ALL DISTRICTS Moved, seconded and duly carried:
Accepting Job No. PW-061R-1
as complete That the Boards of Directors hereby
adopt Resolution No. 87-70, accepting
Rehabilitation of Danes and Sludge Pump Mixing Systems for Digesters 5 and 6 at
Reclamation Plant No. 1, Job No. PW-061R-1, as complete, authorizing execution of
a Notice of Completion and approving Final Closeout Agreement. A certified copy
of this resolution is attached hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Change Order No. 3 to the
plans and specifications re Job That Change Order No. 3 to the plans and
No. P1-28 and Job No. P2-36 specifications for Advanced Primary
Treatment Chemical Addition Facilities
at Plant No. 1, Job No. P1-28, and Advanced Primary Treatment Chemical Addition
Facilities at Plant No. 2, Job No. P2-36, authorizing an addition of $14,196.00 to
the contract with Ziebarth & Alper for extension of polymer drain and construction
of protective barricade; installation of floor drain; door modifications; and
additional piping in ferric chloride pump room, and granting a time extension of
17 calendar days for completion of said additional work, be, and is hereby,
approved.
-7-
07/08/87
ALL DISTRICTS Moved, seconded and duly carried:
VanApproving Change Order No. 11 to
and specifications re That Change Order No. 11 to the plans
Job No. P2-28-1 and specifications for Installation of
Replacement Belt Filter Presses at Plant
No. 2, Job No. P2-28-1, authorizing an addition of $10,956.00 to the contract with
Ziebarth & Alper for installation of a bubbler level system for controlling the
centrifuge centrate pumps, and modification of belt press drains to provide
necessary clearance, and granting a time extension of 18 calendar days for
completion of said additional work, be, and is hereby, approved.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Change Order No. 1 to the
plans and specifications re That Change Order No. 1 to the plans and
Specification No. 14-029 specifications for Removal of Grit at
Plant No. 2, Specification No. M-029,
reducing the aggregate general liability insurance requirement for bodily injury
and property damage from $3,000,000 to $1,0001000, for a total deduction of
$5,000.00 from the contract with Falcon Disposal Service, Inc., be, and is hereby,
approved.
ALL DISTRICTS Moved, seconded and duly carried:
Approving plans and specifications
re Job M. J-16 That the Boards of Directors hereby
adopt Resolution No. 87-71, approving
plans and specifications for Lighting Conservation Facilities at Plants 1 and 2,
Job No. J-16, and authorizing the General Manager to establish the date for
receipt of bids. A certified copy of this resolution is attached hereto and made
a part of these minutes.
AIL DISTRICTS Moved, seconded and duly carried:
Accepting Specification No. R-024
as complete That the Boards of Directors hereby
adopt Resolution No. 87-72, accepting
Rehabilitation of No. 4 Trickling Filter at Reclamation Plant No. 1, Specification
No. R-024, as complete, authorizing execution of a Notice of Completion and
approving Final Closeout Agreement. A certified copy of this resolution is
attached hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Mrovin Addendum No. 1 to the
plans a� specifications re That Addendum No. 1 to the plans and
Specification No. R-025-1 and specifications for Underground Tank
Specification No. R-025-2 Replacement at Plant No. 1,
Specification No. R-025-1, and
Underground Tank Replacement at Plant No. 2, Specification No. R-025-2, revising
the schedule of work, making miscellaneous technical clarifications and providing
a list of procedures and tests requiring inspection by appropriate city and county
agencies, be, and is hereby, approved.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Addendum No. 2 to the
plans and specifications re That Addendum No. 2 to the plans and
Specification No. R-021 1 and specifications for Underground Tank
Specification No. R-025-2 Replacement at Plant No. 1,
Specification No. R-025-1, and
`.� Underground Tank Replacement at Plant No. 2, Specification No. R-025-2, providing
for the inclusion of provision relative to time allowed for completion of
contract and establishing liquidated damages amount, be, and is hereby, approved.
_8_
07/08/87
ALL DISTRICTS Moved, seconded and duly carried:
Awarding Specification No. R-025-1
and Specification No. R-025-2 to That the Boards of Directors hereby
Sawn Engineering, Inc. adopt Resolution No. 87-73, receiving
and filing bid tabulation and
recamwldation, and awarding contract for Underground Tank Replace�ent at Plant \„✓
No. 1, Specification No. R-025-1, and Underground Tank Replacmpnt at Plant No. 2,
Specification No. R-025-2, to Sancon Engineering, Inc. for the total amount of
$305,185.00. A certified copy of this resolution is attached hereto and made a
part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Awarding Specification No. S-041 to
Consolidated Reprographics That the bid tabulation and
reouanenndation re award of contract for
Blueprinting, Photocopying and Related Services, Specification No. S-041, be, and
is hereby, received and ordered filed; and,
FURTHER ICJ®: That said contract be, and is hereby, awarded to Consolidated
Reprographics for an amount not to exceed $75,000.00 for a one-year period
beginning July 16, 1987, with provision for a one-year extension.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Addendum No. 3 to the
Architectural Services Agreement That the Selection C®ittee
with Pulaski and Arita, Architects, certification of the final negotiated
Incorporated re Job No. J-7-4 fee re Addendum No. 3 to the
Architectural Services Agreement with
Pulaski and Arita, Architects, Incorporated, for the design of Administration
Building Addition, Job No. J-7-4, providing for additional design services to
modify the heating, ventilation and cooling system, be, and is hereby, received,
ordered filed and approved; and,
PURV R MDNW: That the Boards of Directors hereby adopt Resolution No. 87-74,
approving Addend= No. 3 to the Architectural Services Agreement with Pulaski and
Arita, Architects, Incorporated, for design of Administration Building Addition,
Job No. J-7-4, providing for additional design services to modify the heating,
ventilation and cooling system, on an hourly-rate basis for labor including
overhead, plus fixed profit, for an additional amount not to exceed $10,867.00,
increasing the total authorized canpensation from $237,000.00 to an amount not to
exceed $247,867.00. A certified copy of this resolution is attached hereto and
made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Professional Services
Agreement with Pulaski and Arita, That the Selection Committee
Architects, Incorporated re certification of the final negotiated
Job No. P2-35-1 fee re Professional Services Agreement
with Pulaski and Arita, Architects,
Incorporated, for design of Phase I Lrprovements of Master Plan of Support
Facilities, Site and Security Improvee nts at Treatment Plant No. 2, Job
No. P2-35-1, be, and is hereby, received, ordered filed and approved; and,
FTIRTFER MWED: That the Boards of Directors hereby adopt Resolution NO. 87-75,
approving Professional Services Agreement with Pulaski and Arita, Architects,
Incorporated for design of Phase I Improves ants of Master Plan of Support ,.
Facilities, Site and Security Inprovements at Treatment Plant No. 2, Job
No. P2-35-1, on an hourly-rate basis for labor plus overhead, plus direct �✓
expenses and fixed profit, for a total amount not to exceed $93,375.00. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
-9-
07/08/87
ALL DISTRICTS . Moved, seconded and duly carried:
Approving Engineering Services
Agreement with Brown and Caldwell That the Selection Committee
Consulting Engineers re certification of the final negotiated
`..� Job No. P2-37 fee re Engineering Services Agreement
with Brown and Caldwell Consulting
Engineers for design and related services re Miscellaneous Modifications and
Improvements to Facilities at Treatment Plant No. 2, Job No. P2-37, be, and is
hereby, received, ordered filed and approved; and,
EU M ER MOVED: That the Boards of Directors hereby adopt Resolution No. 87-76,
approving Engineering Services Agreement with Brown and Caldwell Consulting
Engineers for design and related services re Miscellaneous Modifications and
L:provenents to Facilities at Treatment Plant No. 2, Job NO. P2-37, on an
hourly-rate basis for labor plus overhead, plus direct expenses and fixed profit,
for a total amount not to exceed $364,000.00. A certified copy of this
resolution is attached hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing staff to issue Change
Order No. 1 to Purchase Order That staff be, and is hereby, authorized
No. 26444 to Carleton Engineers & to issue Change order No. 1 to Purchase
Consultants, Inc. Order No. 26444 to Carleton Engineers &
Consultants, Inc., increasing the total
amount from $18,000.00 to $35,000.00, for additional consulting assistance in
acquiring air emission credits required by SCAQMD, and securing approval of said
emission credits by SCAQMD for the Central Power Generation Systems project (Job
No. J-19).
ALL DLSPRICIS Moved, seconded and duly carried:
Authorizing the Selection Ca:mittee
to negotiate Addendum No. 1 to the That the Selection Committee be, and is
Engineering Services Agreement with hereby, authorized to negotiate Addendum
Boyle Engineering Corporation re No. 1 to the Engineering Services
design of Job No. P1-27 Agreement with Boyle Engineering
Corporation for the design of Entrances,
Site, Security and Interior Roads, Plant No. 1, Job No. P1-27, for additional
services required to coordinate construction with several concurrent projects, and
to obtain a CALTRANS permit for the new entrance on Ellis Avenue at the San Diego
Freeway southbound on/offramp.
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing execution of a Grant of
Easement to Southern California That the Boards of Directors hereby
Edison Cxmpany in order to provide adopt Resolution No. 87-77, approving
separate service to Administration and authorizing execution of a Grant of
and laboratory buildings Easement to Southern California Edison
Company for installation and maintenance
of SCBC facilities on Districts' property in order to provide separate electrical
service to the Administration and Laboratory buildings. A certified copy of this
resolution is attached hereto and made a part of these minutes.
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and approve written
report of the Executive Camattee That the written report of the Executive
Committee's meeting on June 24, 1987,
be, and is hereby, received, ordered filed and approved.
-10-
07/08/87
ALL DISTRICTS Moved, seconded and duly carried:
Approving Issue Paper and Recar
mended Actions Re Impact on POIW's That the Issue Paper and Recamiended
of Proposed SCAUM Rule 223 and Actions re Impact on Publicly-Owned
Rule 1401 Sewage Treatment Works (POTW's) of
Proposed South Coast Air Quality
Management District Rule 223 and Rule 1401, be, and is hereby, approved.
ALL DISTRICTS loved, seconded and duly carried:
Amending Classif cat on & Compensa-
tion Resolution No. 79-20 re That the Boards of Directors hereby
organizational changes adopt Resolution No. 87-78, amending
Classificatiion & Compensation
Resolution No. 79-20, as amended, providing for certain organizational changes. A
certified copy of this resolution is attached hereto and made a part of these
minutes.
DISTRICT 1 Moved, seconded and unanimously carried
Approving 1987-88 fiscal year by roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 1
Operating Fund $ 6,683,000.00
Accumulated Capital Outlay Fund 11,247,000.00
Construction Fund 15,074,000.00
Facilities Revolving Fund 1,461,000.00
Bad & Interest Furl - 1951 158,450.00
$34,623,450.00
FURTHER MOVED: That said budget be, and is hereby, received and ordered filed.
DISTRICT 2 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 2
Operating Fund $ 21,743,000.00
Accumulated Capital Outlay Fund 52,331,000.00
Construction Fund 37,317,000.00
Facilities Revolving Fund 21,313,000.00
Bond & Interest fiord - 1951 95,080.00
Bond & Interest Fund - 1958 761,687.00
$133,560,767.00
FURTHER MWED: That said budget be, and is hereby, received and ordered filed. __
07/08/87
DISTRICT 3 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
�../ budget be, and is hereby, approved and adopted in the following amounts:
District 3
Operating Fund $ 19,985,000.00
Annulated Capital Outlay Flmd 52,485,000.00
Construction Fund 42,083,000.00
Facilities Revolving Flom 15,085,000.00
Bond & Interest Fund - 1951 & 1958 1,146,244.00
$130,784,244.00
FURTHER MOVED: That said budget be, and is hereby, received and ordered filed.
DISTRICT 5 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 5
Operating Fund $ 5,737,000.00
nima'lated Capital Outlay Fund 10,908,000.00
Facilities Revolving Fund 1,683,000.00
Bond & Interest Fund - 1951 54,01.1.00
$ 18,382,011.00
FURTHER bnW: That said budget be, and is hereby, received and ordered filed.
DISTRICT 6 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote: .
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 6
Operating Fund $ 3,549,000.00
Accumulated Capital Outlay Fund 6,709,000.00
Facilities Revolving Fund 2,479,000.00
Bond & Interest Fund - 1951 29,439.00
" $ 12,766,439.00
FURTHER MWED. That said budget be, and is hereby, received and ordered filed.
V.. -12-
07/08/87
DISTRICT 7 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 7
Operating Pled $ 8,048,000.00
AcCunilated Capital Outlay Rind 25,060,000.00
Facilities Revolving Pled 6,064,000.00
Bond & Interest Fund - 1951 29,533.00
Band & Interest Fund - 1962 844,487.00
Bond & Interest Fund - 1970 995,338.00
$ 41,041,358.00
PuRTHER MAID: That said budget be, and is hereby, received and ordered filed.
DISTRICT 11 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 11
Operating Plan $ 4,682,000.00
Accumulated Capital Outlay flmd 11,382,000.00
Facilities Revolving Flu:d 3,820,000.00
Bond & Interest Fund - 1951 27,753.00
Bond & Interest Fund - 1958 88,160.00
$ 19,999,913.00
F0RIM MOVED: That said budget be, and is hereby, received and ordered filed.
DISTRICT 13 Moved, sew and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 13
Operating Fund $ 216,000.00
Acammnlated Capital Outlay Fund 5,643,000.00
Facilities Revolving Fled 1,284,000.00
$ 7,143,000.00
FUMM MOVED: That said budget be, and is hereby, received and ordered filed.
�..�
07/08/87
D19MCT 14 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adapted in the following amounts:
District 14
Operating Fund $ 14,000,000.00
Accumulated Capital Outlay R znd 4,598,000.00
S 18,598,000.00
FURMM MNED: That said budget be, and is hereby, received and ordered filed.
DISTRICTS 1, 2, 3, 5, 6, 7 & 11 Moved, seconded and duly carried:
Establishing the annual Gann
appropriations limit for fiscal That the following resolutions
year 1987-88 establishing the annual Gann
appropriations limit for fiscal year
1987-88 for each District in accordance with the provisions of Division 9 of
Title 1 of the California Government Cole, be, and are hereby, adopted by the
respective Boards of Directors:
DISTRICT RFNO. NO. LIMAT'ION
1 87-79-1 S 1,915.00
2 87-80-2 7,965,000
3 87-81-3 10,031,000
5 87-82-5 2,063,000
6 87-83-6 1,201,000
7 87-84-7 2,396,000
ll 87-85-ll 2,108,000
13 — Not Applicable
14 — Not Applicable
Certified copies of these resolutions are attached hereto and made a part of
these minutes.
DISTRICTS 1, 5, 6 & 13 Moved, seconded and duly carried:
Directing the CoWtY Auditor-
Controller to include sewer service That the following resolutions directing
charges on the 1987-88 property the County Auditor-Controller to include
tax bills sewer service charges on the 1987-88
property tax bills, be, and are hereby,
adopted by the respective Hoards of Directors:
DISTRICT RFSO. NO.
1 87-86-1
5 87-87-5
6 87-88-6
13 87-89-13
`..' Certified copies of these resolutions are attached hereto and made a part of
these minutes.
-14-
07/08/87
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and approve written
report of the Building Conuttee That the written report of the Building
Committee's meeting an June 18, 1987,
be, and is hereby, received, ordered file] and approved.
ALL DISTRICTS Moved, seconded and duly carried:
Approving Amendment No. 1 to the
Master Plan of Support Facilities That AmwxIment No. 1 to the Master Plan
for Plant No. 1 of Support Facilities for Plant No. 1
dated January 20, 1987, which includes
the Warehouse and Maintenance Building and Oil Storage and Dispensing Improvements
(Job No. J-20), be, and is hereby, approved.
ALL DISTRICTS Moved, seconded and duly carried:
Authorizing the Selection Cammittee
to solicit proposals and negotiate That the Selection Committee be, and is
an agreenent for design of hereby, authorized to solicit proposals
Job No. J-20 and negotiate an agreement for design of
Warehouse and Maintenance Building and
Oil Storage and Dispensing LRarovements, Job No. J-20.
ALL DISTRICTS Moved, seconded and duly carried:
Receive, file and approve report of
the Fiscal Policy Committee re That the written report of the Fiscal
1987-88 Excess hbrkers' Policy Crnmittee dated June 29, 1987 re
Compensation Insurance Policy 1987-88 Excess Workers' Compensation
Renewal Insurance Policy Renewal be, and is
hereby, received, ordered filed and
approved.
ALL DISTRICTS Moved, seconded and duly carried:
Ratifying action of Fiscal Policy
Committee in placing statutory That the action of the Fiscal Policy
Excess Workers' Compensation (bamittee in placing statutory Excess
insurance coverage effective Workers' Compensation insurance
July 1, 1987 average, with $200,000.00 self-insured
retention, effective July 1, 1987 for an
annual premium not to exceed $29,500.00, be, and is hereby, ratified.
DISTRICT 1 Moved, seconded and duly carried:
Approving Addendum No. 1 to the
plans and specifications re That Addendum No. 1 to the plans and
Contract No. 1-15R specifications for Santa Ana/Dyer Road
Trunk Sewer Manhole Rehabilitation,
Contract No. 1-15R, increasing the number of manholes to be rehabilitated from 23
to 25, transmitting revised Schedule of Prices and making miscellaneous technical
clarifications and modifications, be, and is hereby, approved.
DISTRICT 1 Moved, seconded and duly carried:
Awarding Contract No. 1-15R to
Sanam Engineering, Inc. That the Board of Directors hereby
adopts Resolution No. 87-90-1, receiving
and filing bid tabulation and recommendation, and awarding contract for Santa
Ana/Dyer Road Trunk Sewer Manhole Rehabilitation, Contract No. 1-15R, to Sancon -
Engineering, Inc. for the total amount of $139,000.00. A certified copy of this
resolution is attached hereto and made a part of these minutes.
-15-
07/08/87
DISTRICT 1 - Moved, seconded and duly carried:
Adiourrz ent
That this meeting of the Board of
Directors of County Sanitation District No. 1 be adjourned. The Chairman then
�...' declared the meeting so adjourned at 8:52 p.m., July 8, 1987.
DISTRICT 2 Moved, seconded and duly carried:
Approving Amendment No. 1 to the
Consolidated Master Plan of Trunk That Amendment No. 1 to the Consolidated
Sewers for County Sanitation Master Plan of Trunk Sewers for County
Districts Nos. 2 3 and 11 re Sanitation Districts Noe. 2, 3 and U
EucliWNawhopa7piacentia Drainage relative to the District No. 2
Area Euclid/Newhope-Placentia Drainage Area,
be, and is hereby, approved.
DISTRICT 2 moved, seceded and duly carried:
Approving agreement with City of
Garden Grove for a cooperative That the Baird of Directors hereby
proiect re Contract No. 2-26-1 and adopts Resolution No. 87-91-2, approving
City storm drain agreement with the City of Garden Grove
relative to a cooperative project in
connection with the construction of a Portion of Euclid Interceptor Sewer,
Contract No. 2-26-1, between Iampson Avenue and Orangewood Avenue, and a City
storm drain between la psoh Avenue and Chapman Avenue. A certified copy of this
resolution is attached hereto and made a part of these minutes.
DISTRICT 2 Moved, seconded and duly carried:
Authorizing staff and General
Counsel to negotiate an agreement That staff and General Counsel be, and
with the City of Brea for a are hereby, authorized to negotiate an
cooperative project re Contract agreement with the City of Brea relative
No. 2-11-3 and City sewer to a cooperative project in connection
improvements with Construction of District's North
Branch of the Rolling Hills Drive Relief
Subtrunk Sewer, Contract No. 2-11-3, and City sewer improvements.
DISTRICT 2 moved, seconded and duly carried:
Authorizing the Selection Conmittee
to nhegotiate and agreement with That the Selection Cenmittee be, and is
Sam W. Peterson & Associates for hereby, authorized to solicit proposals
design of Contract No. 2-11-3 and negotiate an agreement with Sam
W. Peterson & Associates for design of
the North Branch of the Rolling Hills Drive Relief Subtnmk Sewer, Contract
No. 2-11-3.
DISTRICT 2 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 2 be adjourned. The Chairman then
declared the meeting so adjourned at 8:52 p.m., July 8, 1987.
.. -16-
07/08/87
DISTRICT 3 Moved, seconded and duly carried:
Wi-ff M Board action of May 20, .
1987, a=oyinq Emeergencv Repairs That the action of the Bawd on May 20,
re Contract No. 3-32R to authorize 1987, approving Emergency Repairs to
staff to solicit bids and issue Miller-Holder Trunk Sewer, La Habra
purchase orders re Contract Purchase Section, Lines "E" & "W"
No. 3-32R-1 (Contract No. 3-32R), be, and is hereby,
amended to authorize staff to solicit
infornel bids and issue purchase orders to contractors to effect the Abandonment
of Miller-Holder Trunk Serer, La Habra Purchase Section, Line "W" (Contract
No. 3-32R-1) south of Tmrorial Highway at a location where the tributary drainage
area can be diverted to Line "E", provided that the total oust for the initial
emergency repairs and the abandonment shall not exceed the original authorization
granted by the Board of $100,000.00.
DL9TRICT 3 Moved, seconded and duly carried:
Adjournment '
That this meeting of the Board of
Directors of County Sanitation District No. 3 be adjourned to 7:00 p.m.,
Wednesday, July 15, 1987. The Chairman then declared the meeting so adjourned at
8:52 p.m., July 8, 1987.
DISTRICTS 5 & 6 Moved, seconded and duly carried:
Ratifvinq action of staff re
Contract No. 5-30R That the action of staff in proceeding
with Emergency Repairs to Coast Highway
Force Main and Bitter Point Pump Station, Contract No. 5-30R, in a total amount
not to exceed $70,000.00, be, and is hereby, ratified.
DISTRICT 5 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 5 be adjourned. The Chairman then
declared the meeting so adjourned at 8:53 p.m., July 8, 1987.
DISTRICT 6 Moved, seconded and duly carried:
Pd7ourment
That this meeting of the Board of
Directors of County Sanitation District No. 6 be adjourned. The Chairman then
declared the meeting so adjourned at 8:53 p.m., July 8, 1987.
DISTRICT 11 Moved, seconded and duly carrier]:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 11 be adjourned. The Chairman then
declared the meeting so adjourned at 8:53 p.m., July 8, 1987.
DISTRICT 13 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 13 be adjourned. The Chairmen then
declared the meeting so adjourned at 8:53 p.m., July 8, 1987.
DISTRICT 14 Moved, seconded and duly carried:
Adiourwent
That this meeting of the Board of
Directors of County Sanitation District No. 14 be adjourned. The Chairmen then
declared the meeting so adjourned at 8:53 p.m., July 8, 1987.
-17-
07/08/87
DISTRICT 7 Moved, seconded and duly carried:
Acceptinno Grant Deed from A & R, a
California Limited Partnership, re That the Board of Directors hereby
Bear Street Relief Trunk Sewer, adopts Resolution No. 87-92-7, accepting
`.� Contract No. 7-6-1A Grant Deed from A & R, a California
Limited Partnership, conveying ownership
of the Barr Street Relief Trunk Sewer, Contract No. 7-6-1A, to District No. 7, at
no cost to the District. A certified copy of this resolution is attached hereto
and made a part of these minutes.
DISTRICT 7 loved, seconded and duly carried:
Receive and file Staff Summary of
protects and written comments That the Staff Sunmary dated June 30,
received on Negative Declaration 1987, regarding Contract No. 7-10 and
for Contract No. 7-10 and Contract Contract No. 7-10-1 and the written
No. 7-10-1 comments received on Negative
Declaration for North Airport Diversion
Sewer, Contract No. 7-10, and South Airport Diversion Sewer, Contract No. 7-10-1,
be, and is hereby, received and ordered filed.
DISTRICT 7 Moved, seconded and duly carried:
Receive and file written coanents
received on Negative Declaration re That the written c>enents received on
Contract No. 7-10 and Contract the Negative Declaration for North
No. 7-10-1 Airport Diversion Sewer, Contract
No. 7-10, and South Airport Diversion
Sewer, Contract No. 7-10-1, be, and are hereby, received and ordered filed.
DISTRICT 7 Moved, seconded and duly carried:
Approving Negative Declaration for
Abandonment of South Irvine Sub- That the Board of Directors hereby
trunk and MacArthur Trunk Sewer; adopts Resolution No. 87-93-7, approving
and Redirection of Flows to North Negative Declaration for Abandonment of
Airport Diversion Sewer and the South Irvine Subtrunk and MacArthur
South Airport Diversion Sewer; and Tnmk Sewer; and Redirection of Flows to
authorizing filing of Notice of North Airport Diversion Sewer (Contract
Determination No. 7-10), and the South Airport
Diversion Sewer (Contract No. 7-10-1);
and authorizing filing of Notice of Determination pursuant to CEQA. A certified
copy of this resolution is attached hereto and nude a part of these minutes.
DISTRICT 7 loved, seconded and duly carried:
Approvinng protect for canstrpgtlon
of North Airport Diversion Sewer, That the Board of Directors hereby
Contract No. 7-10; and authorizing adopts Resolution No. 87-94-7, approving
the General Manager and District project for construction of North
Chairman to award contract Airport Diversion Sewer, Contract
No. 7-10; and authorizing the General
Manager, with the concurrence of the Chairman of the District, to award said
contract to the lowest responsible bidder. A certified copy of this resolution is
attached hereto and made a part of these minutes.
DISTRICT 7 The Board convened in closed session at
Convene in closed session pursuant 8:55 p.m. pursuant to Government Cade
to Government Code Section 54956.8 Section 54956.8 to discuss possible
eminent domain proceedings.
-18-
07/08/87
DISTRICT 7 At 9:13 p.m. the Board reconvened in
Reconvene in regular session regular session.
DISTRICT 7 moved, seconded and duly carried:
Approving Consent Agreement with
Business Center Drive IV re ease- That the Board of Directors hereby
meet granted by The Irvine Company adopts Resolution No. 87-95-1, approving
re Contract No. 7-10 Consent Agreement with Business Center
Drive IV, a general partnership
consisting of Jamboree Properties and Reinhold Fowler, lessees of property owned
by The Irvine Company, over which the District requires an easement for
construction and perpetual right-of-way needed relative to the North Airport
Diversion Sewer, Contract No. 7-10. A certified copy of this resolution is
attached hereto and made a part of these minutes.
DISTRICT 7 Moved, seconded and duly carried:
Accepting termorary and permanent
Grants of Easement from The Irvine That the Board of Directors hereby
Company re Contract No. 7-10 adopts Resolution No. 87-96-7, accepting
temporary and permanent Grants of
Easement from The Irvine Company required in connection with construction and
perpetual right-of-way needed relative to the North Airport Diversion Sewer,
Contract No. 7-100 at no cost to the District. A certified copy of this
resolution is attached hereto and made a part of these minutes.
DISTRICT 7 moved, seconded and duly carried:
Accepting temporary and permanent
Grants of Easement from Parker That the Board of Directors hereby
Hannifin Corporation re adopts Resolution No. 87-97-7, accepting
Contract No. 7-10 temporary and permanent Grants of
Easement from Parker Hannifin
Corporation required in connection with construction and perpetual right-of-nay
needed relative to the North Airport Diversion Sewer, Contract No. 7-10, at no
cost to the District. A certified copy of this resolution is attached hereto and
made a part of these minutes.
DISTRICT 7 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 7 be adjourned. The Chairman then
declare] the meeting so adjourned at 9:13 p.m., July 8, 1987.
Secretary, Boarts of Directors
County Sanitation Districts Nos. 1, 2, 3,
5, 6, 7, 11, 13 and 14
-19- �.✓
n•
FUND NO 9199 - JT DIST WORKING CAPITAL PROCESSING DATE 6/05/87 PAGE I
CYI - RTPOP,T NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
.,I CLAIMS PAID 36/10/87
VAPRANT NO. VFNDOP AMOUNT DESCRIPTION
086489 ACTION INSTRUMENTS, INC. $1,367.10 SMALL TOOLS
C8649C ADVA NCO CONSTRUCTORS, INC. f1.379.163.97 CONSTRUCTION J-15-1
086491 AEROCOMP. INC. 52.146.44 HYDROGEN SULFIDE STUDY
086492 AIR COLD SUPPLY INC. 576.36 ELECTRONIC PARTS
586493 AIP PRODUCTS 6 CHEMICAL INC. 53.887.68 OXYGEN PARTS
O86-94 ALLIED CORPORATION $9.361.14 CATIONIC POLYMER
C86495 ALLIED SUPPLY CO. SI74.00 PLUMBING PARTS 1 -
�� 086496 ALLIS-CHALMERS CORP. 5553.76 PUMP PARTS
O$6497 ALL PURE CHEMICAL - 137•SB4.BB CHLORINE
P06498 PENDASTRIP. INC AND/OR ALMAR f170.66 OFFICE SUPPLIES
4!; 646499 AMERICAN SCIENTIFIC PRODUCTS $1.340.78 LAB SUPPLIES 1
O86500 ANAHEIM SAY SHOP INC. 6146.50 TOOL REPAIR
086501 THE ANCHOR PACKING CO. 68.224.42 PUMP PARTS _
086502 A-PLUS SYSTEMS $152.55 PRINTING
- -86-03 AOUA BEN CORP. - -- - - f3.958.3$ ANIONIC POLYMER
O86504 ARATEX SERVICES. INC. $3.245.02 UNIFORM RENTALS
Q' 086505 ARENS INDUSTRIES INC. f1.315.04 INSTRUMENT PARTS
086506 ANSA 5450.00 MEETING
1 Z 086507 RALPH V. ATKINSON 5528.7C PUMP PARIS
O865C8 ATLANTIC 0 GULF FISHING SUPPLY $98.65 LAB SUPPLIES
0865C9 FALC CM DISPOSAL SERVICE 944.029.63 GRIT REMOVAL
I � 086510 BACHARACH• INC. $90.05 ELECTRONIC MATERIALS
C86511 BROOKS INS7RUNFNT DIV. 5101.23 INSTRUMENT
086512 BROWN G CALDWELL 1150.00 LAB SUPPLIES ,
086513
YE
AS PRODUCTS $19.02 PROPANE
086514 BUSH EAND G ASSOCIATES. INC. f1.911.00 SURVEYING SERVICES
PBE515 WILLIAM H. BUTLER 3398.62 PETTY CASN
086516 C 6 R RECONDITIONING CO. 199.08 MECNAN ICAL REPAIRS /)
186517 CPT CALIFORNIA. INC. $39.29 OFFICE SUPPLIES
C86518 CS COMPANY 51.609.92 ELECTRIC PARTS
VOGS19 CAL-GLASS FOR RESEARCH. INC. $90.80 LAB SUPPLIES
086520 JOHN CAROLLO ENGINEERS $901.49 ENGINEERING SERVICES-J-19
C86521 CHEMICAL RESEARCH LAB$ $579.99 LAB SERVICES
DOSS22 CHEPWE ST INDUSTRIES, INC. SI0.147.P3 FERRIC CHLORIDE
086823 COLICH L SONS. IJVI 52.591.173.94 CONSTRUCTION 2-25 '•�
C86524 CONSOLIDATED ELECTRICAL DIST. $2.390.66 ELECTRONIC SUPPLIES
086525 CONSOLIDATED REPROGRAPHICS $4.450.98 PRINTING
C86526 CONTINENTAL CHEMICAL CO $8.132.32 CHLORINE
086527 COSTA MESA AUTO SUPPLY $351.72 AUTOMOTIVE PARTS
086529 CAL WATER 5153.15 LEASE
�', OP6529 CUSTEP CONSTRUCTION CO. $733.42 ENGINEERING SERVICES-5-19-R3
O96530 STATE POARD OF EQUALIZATION $68.65 HAZARDOUS SUBSTANCE TAX
y.�.. 686533 DMF. INC. 6929.87 AUTOMOTIVE PARTS
086532 DANIEL BOYLE ENGP.. INC. $518.90 ENGINEERING SERVICES-3-31
98E533 DANIELS TIRE SEPVICE 13.217.55 AUTOMOTIVE PARTS
u{,I 086534 OF CO 5924.-I LIGHTING
�E ON
' A?,
/. FUND NO 9199 JT DIST WORKING CAPITAL PPOCESSING DATE 6/05/07 PAGE 2
0. REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF OPA NGE COUNTY
CLAIMS PA 10 C6/1D/67
WARRANT NO. VENDOR AMOUNT DESCRIPTION
006535 DIAL ONE MAGNESS S SONS 39.740.87 CONSTRUCTION SERVICES-PW-149
I, 086536 DIESEL LOGISTICS. INC. $539.20 MECHANICAL REPAIRS
OAf537 DIFILIf PO ASSOCIATES 51.672.15 OFFICE SUPPLIES
I 086538 DISCO PRINT COMPANY $1.560.05 OFFICE FURNITURE
C06539 DODGE CENTRAL $10,904.27 AUTOMOBILE
I086590 OWNN EBY ARDS CORP. 991.16 PAINT CR6541 TMUA/MORCAL 550.00 LAB ANALYSIS
F•I, 986542 EASTMAN. INC. 22,106.42 OFFICE SUPPLIES
C86543 EL TCRITO RESTAURANTS. INC. $351.53 USE CHARGE OVERPAYMENT
086544 FRO CORP. $14,611.38 HYDROGEN PEROXIDE
C86545 FARR SALES S SERVICE S222.75 ELECTRONIC PARTS
486546 FEDERAL EXPRESS CORP. $53.00 SHIPPING
`.: 086547 FISCHER S PORTER CO. $2.830.37 CHLORINE EQUIPMENT
086548 FLO-SYSTEMS $235.32 PUMP PARTS
111"1 DONALD L. FOX R A$SOCIATES 3823.00 SAFETY ENGINEERING SERVICES
086350 THE FOXB OR CONPARY 5794,62 INSTRUMENT PARTS
L•IT 6551 FRANCE COMPRESSOR PRODUCT $675.4P MACHINE PARTS
iX 086552 CITY OF FULLERTON $23.75 WATER USEAGE
11 = 086553 FULLERTON COMMUNITY HOSPITAL S1.267.67 REFUND OF OVERPAYMENT
' •i�' �,,� P86554 BARRIO. LUMBER CO. 32.002.61 SAND
,a C86555 GENERAL TELEPHONE CO. $1.210.49 TELEPHONE
086556 BIERLICH-MITCHELL• INC. $1,045.04 MECHANICAL PARTS
086557 HALSTED A H066AN, INC. 9311.66 ELECTRONIC PARTS
1 086550 HART - LATIMER ASSOC. $299.72 ELECTRONIC PARTS
e ,,N C86559 HATCH S KIRK. INC. $152.64 ENGINE PARTS
006560 S. A. HEALY CO. $139.566.87 CONSTRUCTION PI-23R
0p6561 HOERBIGER C.V.S. CALIF. • INC. S1,509.88 MECHANICAL PARTS
.� 086562 MOOPER CAMERA STORES $154.55 FILM
C 66563 LISA NOOTON S21.84 EMPLOYEE MILEAGE
086564 HOUSE OF BATTERIES $1.233.53 INSTRUMENT REPAIR
046565 HUFFY CORPORATION S94.28 BICYCLE PARTS
086566 R.S. HUGHES CO.. INC. $513.20 PAINT SUPPLIES
086567 CITY OF HUNTINGTON REACH $16.80 WATER USEAGE
F• C86568 IMPERIAL WEST CHEMICAL 51.899.82 FERROUS CHLORIDE
986569 INDUSTRIAL THREADED PRODUCTS $135.64 HARDWARE/STEEL
�•I 4B6570 IN6R AM PRPER S439.53 JANITORIAL/OFFICE SUPPLIES
(r Op6571 IN TERRA 7I ORAL IECHNOLOGY 54.500.00 APPLICATION SOFTWARE SUPPORT
086572 IRVINE RANCH WATER DISTRICT $24.05 WATER USEAGE
.' 0865T3 JACK X CHANGE 591.03 VEHICLE REPAIR
fP6571 ELENN P. JANESON f2.2 J0.7F ENGINEERING SERVICES-PI.28,P2-36
086575 OAM1N BUAIN83 6 SUPPLY 53,241:1IS BEARINGS
OP6576 KEENAN SUPPLY 3I.5TR.RT VALVES
086577 KIF.WIT PACIFIC CO. $86.495.13 CONSTRUCTION J-6-2
U 86578 KING GEARING. INC. $146.07 FITTING
OB6579 KNOWLEDGE BANK, THE S372.10 COMPUTER WORKSHDPS
086T.80 LEC L RO CONSULTING ENGR. S4,737.10 ENGINEERING SERVICES PI-23R,PI-24R,P2-31R
i
J •I �I
FUND NO 1199 - JT DIST WORKING CAPITAL PROCESSING DATE 6/05/87 PAGE 3
�• REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
p. CLAIMS PAID 06/19/87
I•1 WARRAN7 N0. VENDOR AMOUNT DESCRIPTION
'`• 086581 LIGHTING DISTRIBUTORS. INC. $923.46 ELECTRIC PARTS/LIGHTING
S .. OB 6582 LOS ANGELES TIMES 1163.77 ADVERTISEMENTS
D06583 MOS NUCLEAR, INC. f155.09 LAB REPAIRS -
0P65B9 MARGATE CONSTRUCTION. INC. f399.574.]E CONSTRUCTION PN-O61R-1
086505 MATT - EHLDR. INC. $1.255.80 CHLORINATION PARTS
086586 MCKENIA ENGR. L EQUIP. ST.118.79 PUMP PARTS
C665P7 MOORE L TABER f11.798.06 ENGINEERING SERVICES 2-21
086588 NOTION INDUSTRIES. INC. s925.152 MECHANICAL PARTS
I.� 086589 MYERS TIRE SUPPLY '- - 5309.95 AUTOMOTIVE PARTS
I, 086590 NELSON-DUNN. INC. 137.21 ENGINE PARTS
086591 NU-WEST FABRICATION f794.00 MECHANICAL PARTS
�,. P06592 O.M.S. $970.00 TRASH REMOVAL
f.t 086593 ORANGE COAST ELECTRIC SUPPLY $1.129.60 ELECTRIC PARTS
d 086594 ORANGE COAST WINDOW CLEANING 5690.90 MAINTENANCE CONTRACT
086595 ONI TEK CORP - - - - 5768.89 MECHANICAL PARTS
F.
6596 OSCAN.S LOCK B SAFE i199.89 KEYS
+ •: X 086597 COUNTY SANITATION DISTRICT f7.076.32 REIMBURSE WORKERS COMP
086598 PACIFIC SAFETY EOUIPMENT CO. $698.84 SAFETY SUPPLIES
096599 PACIFIC BELL $187.39 TELEPHONE
bU 086600 PAINT STATION $82.26 PAINT
0P6601 PICKWICK PAPER PRODUCTS $126.59 JANITORIAL SUPPLIES
'--I C66602 PLAN-SAK i126.3e OFFICE SUPPLIES
PP6603 POLY-TAIN ER f1.399.Op LAB SUPPLIES
��1 08660R POSTMASTER CYPRESS $26.27 USE CHARGE OVERPAYMENT
W 006605 PRINTRONIK 9150.00 �• •••� ••
O86606 THE FROJECTS SOLUTIONS CO. 53.549.00 INSTRUMENT INSPECTION
" 086E07 PULASKI S ARITA ARCK17ECTS 4982.95 ARCHITECTUAL SERVICES
O86608 PULSAFEEDEP $92.51 PUMP PARTS
�•! 0866P9 RED VALVE CO.. INC. $473.77 PLUMBING SUPPLIES
086610 REMEDY TEMP 3544.00 TEMPORARY SERVICES
�. 086611 REMOTE METER RESETTING SYSTEM $2.000.10 POSTAGE
OB 6612 ROE TRION FERTILIZER CO. i1.858.18 CHEMICALS
GR6613 McGill ENGINEERING . INC. s9.930.9O ENGINEERING SERVICES
I�} 086614 SEA COAST DESIGNS f111.30 RECORDER
C86615 SETOM NAME PLATE CORP. $774.45 SAFETY SUPPLIES
�.- PPE616 SIGMA ENERGY SYSTEMS s13.322.61 CONSTRUCTION-RESIDENTIAL SILENCERS
OB661i - SOIL AND TESTING ENGINEERS f9.B66.38 LAB SERVICES
�'•' 1p6618 SOUTHERN CALIF. EDISON CO. $19,812.18 POWER
f 106619 SOUTHERN COUNTIES OIL CO. 19.219.62 DIESEL MEL
086620 STAR TOOL 0 SUPPLY CO. SI.392.17 TOOLS
406621 - STEPAN COMPANY $1.030." USE CHARGE OVERPAYMENT
086622 STERLING OPTICAL $224.50 FREIGHT
086623 SUNDSTRAND AVIATION OPERATIONS f].525.16 USE CHARGE OVERPAYMENT
O86624 SUPERINTENDENT OF DOCUMENTS 1110.0 PUBLICATION
.86625 THE SUPPLIERS $1,931.25 MECHANICAL/SAFETY SUPPLIES
F8A626 TRAY EL IN AVEL 416.00 TRAVEL SERVICES
J •� i i ,+
FUND NO 9199 JT DIST WORKING CAPITAL PROCESSING DATE 6/05/87 PAGE 4 L`
.6 'I REPORT NUMBER AP01 II
!• .� COUNTY SANITATION DISTRICTS OF ORANGE COUNTY I`IF
.! CLAIMS PAID u6/13/PT I`
.I WARRANT N0. VE NDOP AMOUNT DESCRIPTION
I 08662T TWINING LABORATORIES S2.614.50 LAB INSPECTION
C86629 UNDERGROUND SERVICE ALERT 665.0D MEMBERSHIP FEES
I 086629 UNOCAL $294.62 "SOLIHE
. I,q 986630 UNION SIGN CO. $404.92 SIGNS I"I•
1 086631 UNITED PARCEL SERVICE $130.66 FRE ISKY
C66632 UNIVERSAL PACK $235.63 AUTOMOTIVE PARTS
006633 C86634 V.O.C.S TESTING PREFERENCE, AMC. S1a730.30 OIIG S GERTERGAS ANALYSIS PLTI 6 PLT2 ,
n8663S VETREE SERVICE INC. 5400.00 GROUNDSKE EPING 1,
O8
6
656 PEST COAST ANALY71CAL SRV. $450.90 LAB SERVICES
086637 WESTERN DIGITAL 12, $61.27 USE CHARGE OVERPAYMENT !
i Is 6638 YESTON STATE CHEMICAL SUPPLY $0,634.72 CAUSTIC SODA
Q `I C86639 XEROX CORP. 12.956.89 PRINTING
..I 086640 IIEBARTH AND ALPRR $167.464.23 CONSTRUCTION PI-26,P2-30,P2-36
,{ t26641 RICHARD 8. EDGAR __Y-_-- $100.00- DIRECTORS COMPENSATION s MILEAGE . :
ff
i TOTAL CLAIMS PAID 06/10/87 35d IT.0T1.68 I '
i
L I.1
I `r
SUMMARY AMOUNT
I .� 01 OBER FUND 3 10.44
02 OPEN FUND 12.532.97
I' 02 ACO FUND 2,600,823.23
03 OBER FUND 3,248.31
05 OPER FUND 562.93
05 MO FUND 508,795.59
06 OPEN FUND 49.88
E^I f 06 MO FUND 13,317.57 1
07 OPER FUND 1,996.52
III OBER FUND 202.45
' fil 113 OPEN FUND 18.44
! 114 OPEN FUND 20.00 �
1596 OPEN FUND 3.191.44
1596 ACO FUND 479.297.76
1 1697 OPER FUND 5467.36
07614 OPEN FUND 1:368.39
(% JT OPEN FUND 179,211.17
CORF 1,254,923.04
SELF FUNDED WORKERS COMP INSURANCE FUND 7,076.32
JT WORKING CAPITAL 44,949.87 �.
w! : $5,117,071.0
FUND NO 9199 - JT DIST VOANING CAFITAL PROCESSING DATE 6119/87 PAGE I
REPORT NUMBER AP43
I, COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
' S CLAIMS PAID 06/24/97
i
WARRANT NO. VENDOR AMOUNT DESCRIPTION
O86655 ABM ANALYSIS
$567.50 INSTRUMENT PARTS
j,.. O86607 ASR ANALYSIS .032.00 CONTRACT SERVICE-VIBRATION ANALYSIS -
6: ;• OB 6657 AIR COMPT INC. $2$463.34 HYDROGEN SULFIDE STUDY
OB 6658 AI0. COLD SUPPLY AT INC. .936.3/ ELECTRONIC PARTS
I••I O86669 ALLIED CORPORATION i11$217.19 CATIONIC POLYMER
• F. I' ! 086661 ALLIED S- HSUPPLYALMER CO. S975.39 MECHANICAL PARTS
I•'I OB 6662 ALL15-CHALHEMI CORP. f970.33 PUMP PARTS
OB6662 ALL PURE SCIENTIFIC
317.898.79 LASCHLORINE
986665 AMERICAN SCIENTIFIC PRODUCTS 80,000.00 LAB SUPPLIES
086661 AMVAC CHEMICAL CORP. l$2.070.00 NHHC AI0. EMISSION CREDITS
D86665 ATHEOU ANCHOR PACKING CO. $6,117.07 PUMP PARTS
006667 AQUA BEN CORP. f6r11T.77 ANIONIC POLYMER
086668 ASATEXSOCI TERVICES.LABOR INC. sB$585.00 LADUNIFORM RENTAL
086669 ASSOCIATED KINSOATOPIE3 S5B0.00 LAB SAMPLE ANALYSIS
C`•'. O86670 RALPH V. ATNINSON S520.70 PUMP PARTS
l 086611 AUDIO IVIDEONDUSTRIAL
L SUPPLY,
SERVICE $795.92 AUDIT SERVICES
086672 BC FALCON
DISTAL SUPPLY. INC. f790.18 GRIT
SUPPLIES
(? 086678 FALCON DISPOSAL SERVICE f23$623.28 SAFE REMOVAL
066673 BAN SAFETY L SUPPLY f623.2B SAFETY SUPPLIES
S 086675 BANK OF ANFRICA $3$550.00 TRAVEL L MEETINGS
H( co
086676 B. BAT STREET
5019.00 DEFERRED COMP DISTRIBUTION ,
'•I 096677 BEECH STSEET EMPLOYEE BCNF IT 285.73 EPPONGINEERING
CHARGE
086678 BOBEST BSALES I LL IAM FROST L AS $4r2B0.00 ENGINEERING 5-27
086679 BEAGC+S SALES 6 SERVICE t1.$68.00 ENGINE REPAIR
u86679 BRALCO METALS 761.76 MECHANICAL PARTS
••� OB 6680 BP ITXINEC LDWELL ELECTRIC _ i2$153.00 ELECTRONIC METER
�• �' I 086682 BROWN L CALDWELL ,L00.O6 LAB SUPPORT
086688 BROWN 6 GINEERIN CONSULTING $31r 089.18 ENGINEERING SERVICES J-19
�•, 086683 BUAHE ENGINEERING CO. 059.00 ELECTRONIC PARTS
086689 WBUSHILL AND ASSOCIATES.E3. INC. $1S$000.00 ENGINEERING SERVICES 2-25
..., OBE 685 WILL IAM H. BUTLER .255.00 PETTY CASH II
086686 C 6 A RECONDITIONING S CO. t19930.00 MECHANTRAINING
REPAIRS
086688 CWPCP SO.SALES
SAFETY 3930.00 SAFETY S
O66689 CAL-GLEN SALES S105.1`4 SAFETY SUPPLIES
C86690 CAL-GLASS FOR EQUIPMENT
RESEARCH. INC. t/L.00 OCEAN SAMPLING
( 086691 CAL SOUTH EQUIPMENT CO. $395.00 MAINTENANCE/CALIBRATION ION OF CHLORINE TANKS
686691 CALIF. ASSOC. OF SANITATION $312.00 MEETING AUTOMOTIVE
REPAIRS
086698 CAPLET INC. ,838.25 EVALUATION REPAIRS
(} 086693 JOHN CARLETON ENGINEERS $1.838.20 EVALUATION t AQUISITIONPI-20 OF EMISSIONS CREDITS
086695 JOHN CAROLLO ENGINEERS S$30D7.B6 CONTRACT SERVICES PI-20 PI-22.P1-)I
OB EE95 JOHN DARDLLL CN6INECPS f83r 101.89 ENGINEERING SERVIES PI-22.J•6-2.J-15.
M1 •' C866967 CASTLE CONTROLS. INC. $268.01 PLUMBING t PIPE
O0.(•697 CEPADYNE. INC. $1,429.18 USE CHARGE OVERPAYMENT
I, 086698 CHEMIEST INDUSTRIES, INC. $26.089.59 FERRIC CHLORIDE
J I 086699 CHEVRON U.S.A.r INC. 519.676.85 FUEL S OIL
086700 CHEVRON OIL FICLD RESEARCH $2,364.64 USE CHARGE OVERPAYMENT
III{IkII II
rf' . 1
FUND NO 919R - JT DIST WORMING CAPITAL PROCESSING DATE 6/19/67 PAGE. 2
R EFORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY ;'I
R. CLAIMS PAID 06/24/R7
"1
WARRANT NO. VENDOR AMOUNT DESCRIPTION
�.I 086701 CNICC GAME FISH FARM S51.00 LAB SUPPLIES
086102 COAST PNEUMATICS $60.67 INSTRUMENTATION
OF. 096703 COMMODORE BUSSINESS MACHINES $1'084.D7 USE CHARGE OVERPAYMENT .
066704 CONS CLIDATED ELECTRICAL DIST. f2079.57 ELECTRONIC PARTS
�1 C867G5 CONSCLIDATED REPROGRAPHICS $5.630.28. PRINTING
I•+� 086706 CONTINENTAL CHEMICAL CO $4.758.36 CHLORINE
' Id: 066707 CONTROL DATA CORP. 6261.62 INSTRUMENT REPAIR F.
086TOB CORNIER SU2UX1 - 913.454.80 VEHICLES +
086709 COSTA MESA AUTO SUPPLY 9157.29 - AUTOMOTIVE PARTS
686710 R. E. COULTER CRANE RENTAL $1.830.54 CRANE RENTAL
•I OR6711 COUNTY WHOLESALE ELECTRIC $617.25 ELECTRIC PARTS
086712 CAL WATER $52.75 LEASE
686723 _ LARRT CURTI TRUCK L EQUIPMENT____ $920.00 TRAILER RENTAL
-- 086715 - `CITYDOF E6 RESFONxEL L}O.- 31.274.00 TEMPORARY SERVICES -
6' 086716 CITY OF [CALIFS SL260.00 MANHOLE ADJUSTING
086717 STATE OF CALIFORNIA $480.00 SBE PROCESS FEE
086718 STATE OF CALIFORNIADIS f480.00 ° EQUIPMENT
j^- 086719 DATA WEST DIST. S$20.00 OFFICE ADVERTISEMENTS
966719 DAILY PILOT f28.49 ADVERTISEMENTS
086720�- - - � - OANI EIS TipF SEA VICE - �-����--- ---�-- � 1120.99 AUTOMOTIVE REPAIRS �
086721 TOM DAMES $32.33 EMPLOYEE MEETING f TRAVEL EXPENSES
.� 086722 DISCO PRINT COMPANY $141.79 OFFICE FURNITURE
086723 DORADO ENTERPRISES. INC. $32,517.00 CONTRACT SERVICES R-024
It, 086724 DRIVER TESTING SERVICE $84.00 CONTRACT SERVICES
470_. 086725 DUNN EDWARDS CORP. _ f165.36 PAINT SUPPLIES �..!
^1 086726 OYNAtAON'-ELECTRIC t0., INC. - - "-` `- f175.38 AUTOMOTIVE REPAIRS r
e.' •N 086727 WILDER EADS $115.00 DEFERRED COMP DISTRIBUTION
066728 EASTMAN, INC. $1.977.26 OFFICE SUPPLIES ..
•I 096729 ENCHANTER. INC. $3.50.1.00 OCEAN MONITORING SERVICES
006730 MARSHALL FAIRRES $345.00 DEFERRED COMP DISTRIBUTION -
086731 FARR SALES L SERVICE $38.16 ELECTRIC PARTS
-�096732 FEDERAL EXPRESS CORP. ' ' " --"- 1101.00 SHIPPING
OA6733 FILTER SUPPLY CO. S7113.62 FILTER
086134 FISCHER 8 PORTER CO. 111.876.60 CHLORINATION PARTS
086735 FLAT f VERTICAL CONCRETE S1113.03 CONTRACT SERVICES-CONCRETE CUTTING _
086736 FLEXIBLE SYSTEMS 554.13 SAFETY SUPPLIES
086737 FLO-SYSTEMS 93.396.77 PUMP PARTS
086738 GELBER PUMPS, INC. 2B2.96 PUMP PARTS
Q;•�. 086739 FOUNTAIN VALLEY CAMERA f9.18 PHOTO PROCESSING
'I 086740 DO N ALD L. FOX C ASSOCIATES $825.00 SAFETY ENGINEERING SERVICES
6R 6742 THE FOXBORO COMPANY $706.59 CONTROL PARTS/TOOLS
086742 CITY OF FULLERTON S80.113 WATER USEAGE
I•�� 086743 S.Y.M. COMPANY $47.44 ENGINEERING SUPPLIES
086144 GANAMI. LUMBER CO. S2.575.04 CONSTRUCTION MATERIALS
U t . 086745 BARR ATT•CALLAHAN COMPANY $3.175.38 CHEMICALS
086746 GENERAL TELEPHONE CO. f4.315.99 TELEPHONE
F. .
F.,. FUND NO 9199 - JT DIST WORMING CAPITAL PROCESSING DATE 6/19/R7 PAGE 3
REPORT NUMBER APO3
p COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
¢: I: CLAIMS PAID 06/24187
WARRANT NO. VENDOR AMOUNT DESCRIPTION
4 1.
i•: 086747 THOMAS GRAY
INC. $Il$336.00 MECHANICAL PARTS
1. 0B6748 GRINNE GR AT t ASSOC.,TI INC. $369.00 LAB SUPPLIES
096750 GRINNELL CORPORATION $212.05 VALVES
066751 FRROY000 CENTER .275.00 BUILDING MATERIALS
GB6751 HARK A. HARPER f1$453.00 DEFERRED COMP DISTRIBUTION
O06753 HARRIN6 TON INDUSTRIAL PLASTICS .142.20 MECHANICAL PARTS
086753 MARRIS CONVEYOR CO. fl$786.52 EQUIPMENT RENTAL
006755 MATCH i KIRK. INC. ,325.20 AUTOMOTIVE PARTS
(� 086756 NART6C ENGINEERING CO. f39604.83 ENGINEERING SERVICES
086756 HOOPER CAMERA
C.Y.S. CALIF. . INC. 5600.83 FITTINGS N
.I 066758 HOOP ER CAMERR STORES S197.74 FILM
II 086758 R.S. NGTHEE CO.. INC. l2.068.2A JANITORIAL SUPPLIES
FI DR6760 HUNTINGTON BEACH RUBBER STAMP S471.33 OFFICE SUPPLIES
086760 HUNTINGTON SUPPLY f206.70 REPAIR f MAINTENANCE MATERIALS
086762 HYDROTEM fS9196.63 PETROLIUM PRODUCTS
086763 NYDROTEX FIELD SERVICE 5196.63 OIL
086763 INDUSTRIA TILE DTSTRIBU70RS S523.75 BUILDING MATERIALS
•N E' 38676A INDUSTRIAL STRUCTURES 5193.56 BUILDING IUITERIALS
'•IX JP 676E INDUSTRIAL THREADED PRODUCTS s260.36 HARDWARE
_ _ 086766 INGRAM PAPER $776.51 PAPER
O66767 INLAND EXPIRE EOUIPHENT CO. $273.61 AUTOMOTIVE PARTS
A I�IbO 086760 GLENN R. JAMESON 51.975•00 OPERATIONS MANUALS
-� 06 JOMNIT PUMP
677 AAG867 KMk OAPM63i SUPPLY S60SN72 BEARING
it" OB6771 KEENAN SUPPLY $362.52 VALVE
I 086772 KERNVIEY OIL CO. $168.18 USE CHARGE OVERPAYMENT -
W OB 6773 KING BEARING. INC. $2,790.72 REPAIR f MAINTENCE MATERIALS
e 086774 DONALD C. KINNEY $820.00 DEFERRED COMP DISTRIBUTION
�•- 086775 L.S.Y.S., INC. 521.82 300 AMP GROUND LAMPS
006776 LIGHTING DISTRIBUTORS. INC. $443.43 LIGHTING/ELECTRIC PARTS
I•; 086777 K.P. LINDSTROM, INC. 98.150.00 EIR CONSULTING SERVICES
086770 M.G. INDUSTRIES $729.02 OXYGEN, HELIUM, NITROGEN TANKS
086779 MALCOM MINNIE. INC. $5.844.75 ENGINEERING SERVICES-ODOR CONTROL
386700 MARVAC ELECTRONICS $239.31 ELECTRONIC PARTS
096761 MCKENNA ENGR. 9 EQUIP. s745.18 PUMP PARTS
E � I [86782 MCO-TON ASSOCIATES. INC. $553.90 LAB ASBESTOS STUDY
I" C86793 MICRO COMPUTER OISTR..INC. f3.475.60 COMPUTER PARTS
086784 MICRO MOTION $1.946.13 METER REPAIRS
('T 486785 MIDLAND ROSS CORP. 92,135.75 USE CHARGE OVERPAYMENT
386786 MILLERS PRINTERY $256.02 PRINTING
986767 MITCHELL MANUALS, INC. 6229.60 MANUALS
086788 MOTION INDUSTRIES. INC. S413.26 MECHANICAL PARTS
f. I 986789 NATIONAL INFORMATION DATA CYR. f29.95 PUBLICATION '
006790 NEW HERRES. INC. $43.94 ENGRAVING MATERIALS
(j I 086791 NEWARK ELECTRONICS $89.51 INSTRUMENT PARTS
:{JIB 086792 CITY OF NEWPORT PEACH 56.60 WATER USEAGE
• � 1 it
f FUND NO 9199 - JT 0137 WORKING CAPITAL PROCESSING DATE 6/29/87 PAGE a
REPORT NUMBER AP43
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
,• ( �•' CLAIMS PAID 36/24/07
WARRANT NO. VENDOR AMOUNT DESCRIPTION
F' �•
P � 08F.793 OCCIDENTAL CHEMICAL COPP• f9.039.89 CAUSTIC SODA
086794 OCEAN SALT CO.. INC. $635.68 SALT
(•' +� 086795 ONi INTERNATIONAL CORP. $20.31 USE CHARGE OVERPAYMENT
086796 ORANGE COAST ELECTRIC SUPPLY $159.06 ELECTRIC PARTS
68A797 ORANGE ELECTRO MEMANICAL $I19.67 REPAIR FUSES
( �•� L86798 ORANGE VALVE L FITTING CO. $2,955.61 FITTINGS
'I 006799 OS7ERBAUER COMPRESSOR SERVICE $758.11 COMPRESSOR
086800 COUNTY OF ORANGE $60.705.22 TOXIC ROUND UP/COMMUNICATION SERVICE AGREEMENT
( 086R01 COUNTY OF ORANGE f77.151.94 SLUDGE DISPOSAL FEE
086SO2 COUNTY SANITATION DISTRICT $87.40 EMPLOYEE HEALTH PLAN CONTRIBUTION
08f803 COUNTY SANITATION DISTRICT $2,099.47 REIMBURSE WORKERS COMP
f •' 086804 PC MAGA21NE $27.97 SUBSCRIPTION
086895 PACIFIC MOLECULAR. INC. $621.43 MECHANICAL REPIARS
D86806 - " PACIFIC SAFETY E6UIPNENT CO. '-' " 92.188.21 SAFETY SUPPLIES
('"• 086807 PACIFIC BELL $860.30 TELEPHONE
i' . 066806 PACIFIC WELDING L MANUFACTURIN $282.26 SOLDER
066809 PAN WEST $1.455.94 JANITORIAL SUPPLIES
O66fl10 PEAT.MARWICK.MAIN L CO• f8.225•DO PROFFESIONAL SERVICES
T_ 086811 PEERLESS WIPING MATER16LS CO. $9,153.66 TOWELS
• = " 08"12 ... ROY PENDERGRAFT " " ""'-""-- - -"'-"- "" S445.00 DEFERRED COMP DISTRIBUTION
086613 PHOTO L SOUND CO. 168.00 PROJECTION IMP
I70 086814 PLAINS TRUEVALUE HARDWARE $331.19 HARDWARE
0.86815 POLY ENTERPRISES. INC. $304.75 SAFETY SUPPLIES
--1 086816 PORTER BOILER SERVICE, INC. $478.18 MECHANICAL PARTS
W 086817 POSTMASTER _ $515.76 USE CHARGE OVERPAYMENT
1 I 086818 POWER SPECIALISTS. INC. -"' f1.058.50 ELECRONIC SUPPLIES
( F 086019 PREFERRED PERSONNEL AGENCY $530.00 TEMPORARY SERVICES
•' 08692C HAROLD PRIMROSE ICE S150.00 ICE
OB f.821 THE PROJECTS SOLUTIONS CO. $3,528.00 INSTRUMENTATION INSPECTION
OB 6tl 22 PU LA SNI L APITA AflOH IT EC IS f2.980.00 APCHI TELTUAL SERVICES
1 I 086B23 RHO ENGINEERING, INC. $2.911.27 ENGINEERING SERVICES
066924 THE RE0ISTCR, LEGAL 0100048 - - $2.749.84 PUBLIC NOTICES
686825 REMEDY TEMP $599.00 TEMPORARY SERVICES
'{ 086826 11ICHARDS INDUSTRIES• INC. S929.39 OXYGEN PARTS
P.86827 PICOP CORPORATION $216.78 PRINTING 6 PUBLICATION
( •I 986828 ROSERTSMAW CONTROLS CO. $747.65 MECHANICAL PART
C86829 JOSEPH T. RYERSON L SON. INC. 5284.10 METAL
986830 SANTA ANA ELECTRIC MOTORS 111.822.79 ELECTRIC PARTS
r' ! •' 086831 SCIENCE APPLICATIONS INT•L f64.664.45 OCEAN MONITORING
086832 SEA COAST DESIGNS $721.86 OFFICE FURNITURE
181833 SEARS, ROEBUCK L CO. 3152.35 TOOLS
086834 SHAMROCK SUFPLY $4.910.45 SAFETY SUPPLIES/TOOLS
•e "I G86835 SHEPHERD MACH114ERY CO. $13.23 RECLAMATION PART
086636 SHUR - PLATE CORP. S100.00 USE•CHARGE OVERPAYMENT
' t 086837 SLIDE MAKERS WEST 52.395.J•0 PHOTO PROCESSING
� �' 086638 SMITH-EMERY CO. $890.00 SOIL 6 CONCRETE TESTING
( I FUND NO 9199 - JT GIST WORKING CAPITAL PROCESSING DATC 6/39/87 PAGE 5
REPORT NUMBER AP43
4 COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
f CLAIMS PAID 06/24/87
WARRANT NO. VENDOR AMOUNT DESCRIPTION
086839 SOIL AND TESTING ENGINEERS 38.656.78 SOIL TESTING/CONSULTING
086840 SO. COAST AIR DUALITY $6,210.00 PE KNIT FEES
(. "- D86641 SOUTHERN CALIF. EDISON CO. $349.909.25 POWER
586642 SOUTHERN COUNTIES OIL CO. $4,256.37 DIESEL FUEL
086843 SPARKLETTS DRINKING WATER 327.DO DRINKING WATER/RENTAL
/s 986844 STATION STEEL 94.843.09 STEEL
086645 STAR TOOL R SUPPLY CO. 31.844.59 TOOLS
1. 086646 SUMMIT STEEL 3277.58 MECHANICAL PARTS
' ! ( : 086847 SUNSET FORD $313.85 TRUCK PARTS
^ C06846 SUPELCO. INC. $167.55 OCEAN SAMPLING
086849 SUPER CNEN CORP $1.614.38 JANITORIAL/CHEMICALS
086B50 THE SUPPLIERS $1.226.71 SAFETY SUPPLIES/TOOLS
086851 SWEETLAND CO. $64.26 FITTINGS
1 086852 TAX 7AKAMINE $2,280.30 LANDSCAPE
(,: 086553 TAYLOR-DUNN $64.15 TRUCK PARTS
086A54 TICOR TITLE INSURANCE S250.00 TITLE REPORT
086855 TRAFFIC CONTROL SERVICE. INC. S36.04 TRUCK PARTS
r*i 'Xr86B56 TRANSMATION. INC. 3188.60 INSTRUMENT REPAIR
= 086857 TRAVEL TRAVEL 3432.00 TRAVEL SERVICES
.--. 086858 TRUCK a AUTO SUPPLY. INC. $4.678.88 AUTOMOTIVE PARTS
!; � aM 086859 J.G. TUCKER 6 SON, INC. 3532.74 INSTRUMENT PARTS
•H 086860 TWINING LABORATORIES $2,224.00 LAB INSPECTION
"A 086,P61 UNA ENINEEPING. INC. $2.994.25 ENGINEERING S-26
086PE2 U.S.O. CORP. $515.IT SAFETY SUPPLIES
• ' � I 08f863 UNDERGROUND SERVICE ALERT $42.00 MEMBERSHIP FEES
tft 086864 UNITED PARCEL SERVICE $80.41 SNIPPING
086065 UNITED WESTERN ELEVATOR 5290.00 ELEVATOR MAINTENANCE
686866 UNIVERSAL MACK $380.64 OFFICE SUPPLIES
C86867 USERS PREFERENCE, INC. 3I.631.76 AUTOMOTIVE PARTS
(q 086868 V.O.C. TESTING $16.009.09 EMISSIONS TESTS
.y 1 ' C86869 VWR SCIENTIFIC 37.583.39 LAB SUPPLIES
086870 VALCO INSTRUMENTS CO. $1.055.20 PORT VALVES
CA6071 VALCOM S89.14 MECHANICAL PARTS
C86872 VALLEY CITIES SUPPLY CO. $2.530.87 PIPES s FITTINGS
11 C86P73 VAREC DIV. OF EMERSON $1.961.00 MECHANICAL PARTS
OR6074 VERTEX RUSSINESS INTERIORS $43.23 RESTOCKING CHARGE ON RETURNED MATERIAL
C66875 VISAIRE $99.01 ELECTRIC PARTS
086876 Y.Y. PRODUCTS. INC. 3580.23 SAFETY SUPPLIES
• {': 086877 JOHN A. NAPLES $439.36 ODOR CONTROL SERVICES
866878 WAUKESHA ENGINE SERVICENTER $326.57 GASKET
086879 WEST COAST ANALYTICAL BBY. 2459.00 LA6 SERVICES
O66P80 WESTERN WIRE 6 ALLOY 3360.46 WELDING SUPPLIES
0P6P81 YILLOAN ASSOCIATES $8.333.23 ENGINEERING SERVICES
086882 DRESSER-RAND $717.65 COMPRESSORS
A C86883 PEROX CORP. $1,722.35 PRINTING 6 PUBLICATION
�pJF]� 11f 086884 NORRIS YIN6 $18.48 EMPLOYEE MILEAGE
r �f'.
FUND NO 9199 - JT GIST WORKING CAPITAL PROCESSING 04TE 6/l9/87 PAGE 6
_ REPORT NUMBER AP63
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY
y 'I CLAIMS PAID 86/2P/87
t ICI -WARRANT NO. VENDOR AMOUNT DESCRIPTION
} QI'I �• '
086KE5 CITY OF YORBA COUNTY
f60r$88.P0 REFUND OF OVERPAYMENT/ENGINEERING SERVICES
006RR6 YORBA LEN ON COUNTY VRTER 013T 375.49 RENTAL EQUIPMENT
0B682T RICHARD AND GARER f173$228.29 CONSTRUCTDIRECTORS ON P A M
086889 RVCNAR0 B. EDG AP f228.19 DIRECTORS COMP 6 MEETING EXPENSE .
086890 EVELYN MRNT 290.30 DIRECTORS MTG CASA
aD6B90 JAMES WARNER $290.3E DIRECTORS MTG CASA
FA " TOTAL CLAIMS PAID 06/24/8T ftr531.191.20 -
SUMMARY __. _. ..._ _... .___ ._.—..._.AMOUNT . .
/I OPER FUND $ 784.40
/1 RED FUND 441.04
/2 OPER FUND 6.184.49
NFI 02 ACO FUND 27.000.70
. 02 F/R FUND --. - .. . . - ._.__.__.__—_8,154.03 - . .. :•.
13 OPER FUND 12,075.60
ji C I ES OPER FUND 7,510.16
/5 RED FUND - 4,189.74
d #6 OPER FUND 284.56
< �'I E7 OPER FUND 2.295.08
/7 F/R FUND _. ._ _— _. _--. ._ 170.00.. _. .. . . . . '.�
/11 OPER FUND 5,702.19
/13 OPER FUND 3,090.00
I 113 F/R FUND 61,900.00
,1 /14 OPER FUND 480.00
/566 OPER FUND 3,120.47
:. /566 ROD FUND _ _. .. .._.. ._ ._ 19.33
Ci ,� 1697 OPEN FUND 32.51
/7914 OPER FUND 4 S57.91
JT. OPER FUND 761:865.85
COAT 510,293.98
SELF FUNDED WORKERS COMP INSURANCE FUND 2,061.20
I_! JT WORKING CAPITAL --- 109.074.40 • ',
51.531.191.20 ...i
EXCERPT FROM THE MINUTES OF THE REGULAR
JOINT MEETING OF THE BOARDS OF DII2ECIORS OF COUNTY
�./ SANITATION DISTRICTS NOS. 1, 2, 3, 5, 6, 7, 11, 13 AND 14
OF ORANGE COUNTY, CALIFORNIA
A regular joint meeting of the Boards of Directors of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County, California, was held at the
hour of 7:30 p.m., July 8, 1987, at 10844 Ellis Avenue, Fountain Valley,
California.
The Chairman of the Joint Administrative Organization called the meeting to order
at 7:30 p.m.
The roll was called and the Secretary reported a quorum present.
DISTRICT 3 Moved, seconded and duly carried:
Adjournment
That this meeting of the Board of
Directors of County Sanitation District No. 3 be adjourned to Wednesday,
July 15, 1987, to consider the District's long-range financial plan. The
Chairman then declared the meeting so adjourned at 8:52 p.m., July 8, 1987.
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
I, RITA J. BROWN, Secretary of each of the Boards of Directors of County
Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County,
California, do hereby certify that the above and foregoing to be a full, true and
correct copy of minute entries on the meeting of said Boards of Directors on the
Sthday of July, 1987.
IN WITNESS WHEREOF, I have hereunto set my hand this 8th day of July, 1987.
Secretary of1the Boards of Directors
of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14
E RPT FROM THE b=YIES OF THE RHGOIAR
JOINT MEETING OF THE BOARDS OF DIRECTORS OF COUNTY
SANITATION DISTRICTS NOS. 1, 2, 3, 5, 6, 7, 11, 13 AND 14
OF ORAFGE COUNTY, CAIIFORNIA
A regular joint meeting of the Boards of Directors of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County, California, was held at the
hour of 7:30 p.m., July 8, 1987, at 10844 Ellis Avenue, Fountain Valley,
California.
The Chairman of the Joint Administrative Organization called the meeting to order
at 7:30 p.m.
The roll was called and the Secretary reported a quorum present.
DISTRICT 1 Moved, seconded and unanimously carried
Approving 1987-88 fiscal year by roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 1
Operating Fund $ 6,683,000.00
Accumulated Capital Outlay Fund 11,247,000.00
Construction Fund 15,074,000.00
Facilities Revolving Fund 1,461,000.00
Bond 6 Interest Fund - 1951 158,450.00
$34,623,450.00
FARTHER bMED: That said budget be, and is hereby, received and ordered filed.
DISTRICT 2 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 2
Operating Fund $ 21,743,000.00
Accmmolate3 Capital Outlay Fund 52,331,000.00
Construction Fund 37,317,000.00
Facilities Revolving Fund 21,313,000.00
Bond & Interest Fund - 1951 95,080.00
Bond & Interest Fund - 1958 761,687.00
$133,560,767.00
FIUrmw mmm: That said budget be, and is hereby, received and ordered filed.
07/08/87
DISTRICT 3 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
`../ budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 3
Operating Fund $ 19,985,000.00
Accunalated Capital Outlay Fund 52,485,000.00
Construction Fund 42,083,000.00
Facilities Revolving Fund 15,085,000.00
Bond 6 Interest Fund - 1951 & 1958 1,146,244.00
$130,784,244.00
FiII HER MWFD: That said budget be, and is hereby, received and ordered filed.
DISTRICT 5 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 5
Operating Fund $ 5,737,000.00
Accumulated Capital Outlay Fund 10,908,000.00
Facilities Revolving Fund 1,683,000.00
Bond & Interest Fund - 1951 54,011.00
$ 18,382,011.00
FURTHER MOVED: That said budget be, and is hereby, received and ordered filed.
DISTRICT 6 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 6
Operating Fund $ 3,549,000.00
Accumulated Capital Outlay Fund 6,709,000.00
Facilities Revolving Fund 2,479,000.00
Bond & Interest Fund - 1951 29,439.00
$ 12,766,439.00
FURTHER MOVED: That said budget be, and is hereby, received and ordered filed.
-2-
07/08/87
DISTRICT 7 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
`ns budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 7
Operating Fund $ 8,048,000.00
Accumulated Capital Outlay Fund 25,060,000.00
Facilities Revolving Fund 6,064,000.00
Bond & Interest Fluid - 1951 29,533.00
Bond & Interest Fund - 1962 844,487.00
Bond & Interest Fund - 1970 995,338.00
$ 41,041,358.00
FURTHER MDVED: That said budget be, and is hereby, received and ordered filed.
DISTRICT 11 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District ll
Operating Fund $ 4,682,000.00
A=unn3 ated Capital Outlay Fund 11,382,000.00
Facilities Revolving Fund 3,820,000.00
Bond & Interest Fund - 1951 27,753.00
Bond & Interest Fund - 1958 88,160.00
$ 19,999,913.00
FURTHER MWED: That said budget be, and is hereby, received and ordered filed.
DISTRICT 13 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 13 -
Operating Fund $ 216,000.00
Accumulated Capital Outlay Fad 5,643,000.00
Facilities Revolving Fund 1,284,000.00
L 7,143,000.00
` w
FURTHER M7VED: That said budget be, and is hereby, received and ordered filed.
-3-
07/08/87
DISTRICT 14 Moved, seconded and unanimously carried by
Approving 1987-88 fiscal year roll call vote:
budgets
That the District's 1987-88 fiscal year
budget be, and is hereby, approved and adopted in the following amounts:
District 14
operating Fund $ 14,000,000.00
Accumulated Capital Outlay Fund 4,598,000.00
$ 18,598,000.00
FURTHER MOVED: That said budget be, and is hereby, received and ordered filed.
STATE OF CALIPatNIA)
) SS.
COUNTY OF ORANGE )
I, RITA J. BROWN, Secretary of each of the Boards of Directors of County
Sanitation Districts Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14 of Orange County,
California, do hereby certify that the above and foregoing to be a full, true and
correct copy of minute entries on the meeting of said Boards of Directors on the
8th day of July, 1987.
IN WITNESS WfWMF, I have hereunto set my hand this 8th day of July, 1987.
Secretary of the Boards of Directors
of County Sanitation Districts
Nos. 1, 2, 3, 5, 6, 7, 11, 13 and 14
-4-
STATE OF CALIFORNIA)
) SS.
COUNTY OF ORANGE )
Pursuant to California Government Code Section 54954 . 2 ,
I hereby certify that the Agenda for the Regular Board Meeting
on . $ , 1987 was duly posted for public inspection
at the main lobby of the Districts' offices onw a1 ,
1987.
IN cWIITNESS WHEREOF, I have hereunto set my hand this
day of , 1987.
Rita J. Brown, Secret
each of the Boards of Directors
of County Sanitation Districts
Nos. 1, 2 , 3, 5, 6 , 7 , 11, 13 &
14 of Orange County, California