HomeMy WebLinkAbout1981-04-29COUNTY SANITATION DISTRICTS
OF ORANGE COUNTY, CALIFORNIA
P. 0. BOX 8127. FOUNTAIN VALLEY, CALIFORNIA 92708
10844 ELLIS AVENUE (EUCLID OFF-RAMP, SAN DIEGO FREEWAY)
April 23, 1981
NOTICE OF ADJOURNED MEETING
DISTRICT NO. 5
WEDNESDAY) APRIL 29) 1981 -5:30 P.M.
NEWPORT BEACH CITY HALL ANNEX
3300 NEWPORT BOULEVARD
NEWPORT BEACH) CALIFORNIA
Pursuant to adjournment of the adjourned regular meeting of
April 13, 19 8 1, the Board of Directors of County Sanitation
District No. 5 will meet in an adjourned meeting at the above
hour and date.
JWS:rb
TELEPHONES:
AREA CODE 714
540-2910
962-2411
~~-~~ BOARDS OF DIRECTORS
.....
II
County Sanitation Districts
of Orange County, Califoml1
DISTRICT No. 5
ADJOURNED MEETING
WEDNESDAY) APRIL 29., 1981 -·S-:-30 ·P.M.
(.1) Roll call
NEWPORT BEACH CITY HALL ANNEX
3300.NEWPORT BOULEVARD
NEWPORT BEACH., CALIFORNIA
Post Office Box 8127
10844 Ellis Avenue
Fountain Valley, Calif., 92708
Telephones:
Area Code 714
540-2910
962-2411
AGENDA
(.2). Verbal report of District's engineer, Shaller & Lohr, Inc.
re Phase I of study of Pacific Coast Highway Trunk Sewer
system, from: Dover Drive. to Rocky P.oint Pump Station
(3) Consideration of motion authorizing the Selection Cormnittee
to negotiate with Shaller & Lohr, Inc. for preparation of
plans and specifications Reha~ilitation of Pacific Coast
Highway Trunk Sewer from Dover Drive to Rocky Point Pump
Station
(4) Consideration of motion approving the following as prequalified
contractors that would be allowed to bid on construction of
the Back Bay Trunk Sewer, Co~tract No. 5-24, and the Enhancement
Program for the Big Canyon Drainage Area (Big Canyon Marsh
Restoration Project), Contract No. 5-24-1:
John A. Artukovich Sons, Inc. -Azusa
Clarke Contracting ·corporation -Compton
K.E.C. Company -Corona
Kordick Construction -Irvine
Pascal & Ludwig, Inc. -Upland
Steve P. Rados, Inc. -Santa Ana
Sully-Miller Contracting Co. -Orange
(5) Consideration of Resolution No. 81-61-5, approving plans and
specifications for Purchase of Approximately 5,000 Feet of
24-Inch Ductile Iron Pipe and Fittings, Contract No. S-24A,
for use in construction of the Back Bay Trunk Sewer, and
authorizing the General Manager to establish the date for
receipt of bids.· See page "A"
(6) Consideration of motion authorizing the staff to solicit
proposals from Vulcan Painters, Inc. and Bit-Co for ~
Installation of Protective Coating in Back Bay Trunk Sewer
Pipe, Contract No. S-24B, which was previously purchased and
has been stored at Plant No. 1 since 1976
(7) Consideration of user charge implementation:
(a) Status report on implementation for 1980-81
(b) Report of staff on tentative user fee rate schedule
(8) Other business and conununications, if any
(9) Consideration of motion to adjourn
II A"
RESOLUTION NO. 81-61-5
APPROVING PLANS AND SPECIFICATIONS FOR PURCHASE OF
APPROXIMATELY 5,000 FEET OF 24-INCH DUCTILE IRON
PIPE AND FITTINGS, CONTRACT NO. 5-24A
A RESOLUTION OF THE BOARD OF DIRECTORS OF COUNTY
SANITATION DISTRICT NO. 5 OF ORANGE COUNTY, CALIFORNIA,
APPROVING PLANS AND SPECIFICATIONS FOR PURCHASE OF
APPROXIMATELY 5,000 FEET OF 24-INCH DUCTILE IRON PIPE
FITTINGS, CONTRACT NO. S-24A
* * * * * * * * * * * * *
The Board of Directors of County Sanitation District No. 5 of Orange County,
California,
DOES HEREBY RESOLVE, DETERMINE AND ORDER:
Section 1. That the detailed plans, specifications and contract documents
this day submitted to the Board of Directors by the District's Chief Engineer, for
PURCHASE OF APPROXIMATELY 5,000 FEET OF 24-INCH DUCTILE IRON PIPE AND FITTINGS,
CONTRACT NO. 5-24A, are hereby approved and adopted; and,
Section 2. Tilat the Secretary be authorized and directed to advertise for
bids for said work pursuant to the provisions of the H~alth and Safety Code of the
State of California; and,
Section 3. Tilat the General Manager be authorized to establish the date and
time at which said bids will be publicly opened and read; and,
Section 4. That the Secretary of the Board and the District's Chief Engineer
be authorized to open said bids on behalf of the Board of Directors.
PASSED AND ADOPTED at an adjourned meeting held on April 29, 1981.
AGENDA ITEM #5 II A"
II
MANAGER'S AGENDA REPORT
County Sanitation Districts
of Orange County, California
DISTRICT NO. 5
Adjourned Meeting
Wednesday, April 29, 1981 -5:30 p.m.
Post Office Box 8127
10844 Ellis Avenue
Fountain Valley, Calif., 92708
Telepbcnes:
Area Code 71 4
540-2910
962-2411
No. 2 -Verbal Report on Phase I of the Study of the
Pacific Coast Hi.ghway Trunk Sewer S'ystem.
A verbal report will be presented to the Directors outlining
the findings of Shaller & Lohr, Inc ., in their evaluation of the
portion of the Pacific Coast Highway Trunk from Dover Drive to
the Rocky Point Pump Station.
No. 3 -Authorit
In accordance with the findings of Phase I of the study of
the Pacific Coast Highway Trunk Sewer System, the staff is recom-
mending that authority be given for the Selection Committee to
negotiate with Shaller & Lohr, Inc., to prepare the plans and
specifications for the rehabilitation of the abandoned sewer line
from Dover Drive to the Rocky Point Pump Station. The staff
recommends that negotiations take place before the regular meeting
of the Board on May 13th .
No. 4 -A roval of L~st
Back Bay Drive Trun ewer an
p ·re ualified Contractors for
En ancement .
At the April 8th meeting, the Directors authorized the staff
to prepare prequalification documents in order that only competent
contractors would be allowed to bid on this environmentally sensitive
project. Notices of intent to prequalify contractors were mailed
to 20 contractors who had successfully completed work for the
Sanitation Districts within the past few years. In addition , notice
was published in The Green Sheet, of the F. W. Dodge Compan y , of the
District's Intent to Prequalify.
Ten responses were received from interested contractors ; three
were disallowed because they arrived at the Districts' offices after
the time and/or date set for receipt of prequalification statements .
The staff has reviewed the submittals and recommends that seven
contractors be allowed to bid on this project.
No . 5 -Ap .proval of Plans and Specifications for Purchase
of Approximately 5000 Feet of Ductile Tron Pipe and Fittings for
Construction of the B·ack B·ay Drive Trunk s ·ewer.
On April 15th, the District received Coastal Cormnission
approval of a permit for the construction of the Back Bay Trunk
Sewer and the Marsh Enhancement Program. The time allowed for
construction of these projects is very short . We have discussed
procurement times with manufacturers of ductile iron pipe, and
find tha~ six to eight weeks are required to obtain the pipe . In
addition, we have been advised that it will be necessary to sand -
blast and coat the previously purchased pipe which has been stored
on site at Plant No. 1 since the initial attempt to receive a
Coastal CoIIIDlission Permit for this work in 1976.
Pursuant to Coastal Commission permit requirements, this pro-
ject must be constructed in phases. The Districts would, therefore,
anticipate the following revised schedule:
April 29
June 10
June 23
July 8
August 1
August 15
December 1, 1981
Approval of plans and specifications
for purchase of approximately 5000
feet of ductile iron pipe and fittings
Authority to negotiate with firms known
to sandblast and coat ductile iron pipe
Award contract for pipe purchase
Award contract for sandblasting and
coating of existing pipe
Receive bids for Back Bay Drive Trunk
Sewer and Big Canyon Marsh Enhancement
Programs
Award construction contracts for sewer
and marsh enhancement
Begin construction in Big Canyon using
existing sandblasted and coated pipe
Begin construction in Back Bay Drive
using newly purchased ductile iron pipe
and fittings
Complete all construction
The major change in this schedule is that it allows for the
District to purchase the pipe for the Back Bay Drive portion of
the project in order that the six to eight week procurement time
can dovetail with the contractor's need for the new pipe on August
15' 1981.
-2-
. "
~--·-~
The staff is reconnnending approval of the plans and speci-
fications for the manufacture of approximately 5000 feet of
ductile iron pipe and fittings.
No. 6 -Authorit to Solicit Pro osals for the Sandblastin
and Coating of Approximately 50'0 Feet o Ductile Iron Sewer Pipe.
In 1976, 9,000 feet of ductile iron pipe was purchased in order
to accelerate the construction of the Back Bay gravity sewer. During
the period from 1976 to present, approximately 4500 feet of the pipe
have been sold to other Districts or utilized on projects within
Sanitation District No. 5. The remaining 4500 feet have been stock-
piled at the Districts' Treatment Plant No. 1. The staff recom-
mends that this pipe receive a special protective coating to insure
that the pipe will have an extended useful life . There are two ·firms
known to perform this type of work, Vulcan Painters, Incorporated
of Birmingham, Alabama and Bit-Co of Oakland, California. The staff
is requesting authority to solicit proposals from these two firms
for the sandblasting and recoating of this existing 4500 feet of
24-inch ductile iron pipe.
No. 7 -Proposed User Fee -1981-82 Fiscal Year.
The Districts' staff is currently preparing user fee schedules
for the above-mentioned fiscal year based on the size of the water
meters for each parcel within the District. The information avail-
able to us through the Newport Beach City Water Department related
to water use appears to be the best approach. We believe because
of our inability to develop a user fee system with complete equity
within the next few weeks, and because the District has some accumu-
lated funds on hand, the first year's charges should be rather low.
During the next twelve months we will be able to completely
review the equity of sewer use charges for all types of users.
Provisions will be included in the ordinance to adjust charges if
substantial amounts of the metered water do not end up in the sewer.
Attached are some sample user fee schedules indicating annual
charges based on the size of the water meters. We are assuming
that single-family residential properties are served by meters of
1-inch or less.
The staff will refine these numbers and submit a reconnnenda-
tion for the Board's consideration at Wednesday's meeting .
-3-
Fred A. Harper
General Manager
(
Est 1 d Charge @
Connected Heter Size 'leters $1.00/Uni t
111 or less 19,925 $3lt,869
H" It 12 1,lt42
2" 652 4,564
311 22 308
411 97 2,716
611 88 4,928
8" 40 4,480
TOTAL 21,236 $53,307
" .. ,
I
Annual Charge
Per Connect ion
$ 17.50
35.00
10.00
140.00
280.00
560.00
1,120.00
(
COUNTY SANITATION DISTRICT NO. 5
USER CHARGE RATE CALCULATION SCHEDULE
Total Annual Annual Charge Total Annual
Char~es Per Connect ion Charges
$3lt8,688 $ 26.25 $523,031
14,lt20 52,50 21,630
1t5,61to 105.00 68,lt60
3,080 210.00 4,620
27, 160 420.00 40,740
49,280 8lto.oo 73,920
44,800 1,680.00 67,200
$533,068 $799,601
--Annual Charge Total Annual
Per Connection Charges
$ 35.00 $ 697.375
I
I 70.00 28,840
llt0.00 91,280
280.00 6, 160
560.00 54,320
1, 120.00 98,560
2,240.00 89,600
$1,066, 135
(
4/23/81
A~n~a·I-Charg~ ---T~t~ I -A~~~~ I
Per Connec. t ion Charges
$ i,3,75 s 871, 718
87.50 36,050
175.00 1llt,100
350.00 7,700
700.00 67.900
1,400.00 123,200
2,800.00 112,000
$1,332,668
,.,
4)
I
'l r
PRELIM INARY 1 IMETABLE FOR l(HPI U1ENTAT I UN 0 1 USER ILL
TO BE COLLECTED ON AERTY TA X BILL
ALTERNATIVE A 1981/82
/\-1 APR I L 29 MAY 13 MAY 15 M/\Y 25 M/\Y 26 MAY 27 JUNE 2 J UN E 3 I 11 I 5 JUNE 9
I
-~oNslo{R us ER 11 NTRoDuc£ oRc.J FEE RATE TO Bf I NANCE ESTA -
ESTABLl SllED LI SlllNG USEP
-----FEE
~--
!
HEA RIN G ON
ORDINANCE &
REPORT
ADOPT ORD I -
1
---
Vl
:z
0
1-u
<t
0 a:
<t
0
tD
>-1-
>
1-u
<t
l-a:
0 a.. a..
~
"' lL
LL
<t
I-
V)
REC[ I VE & F I LE
USER FEE RE-
PORT DESCRIB -
I NG PROPERTY
& FEE TO BE
L EV I ED
ESTABL I SH
PUBL I C HEAR -
i NG DATE FOR
REPORT
EDP PROGRAMMING AND PROCESS I NG TO EXTRACT
P/\RCELS FROM COUNTY RO LL TO PROVIDE D/\TA
B/\SE FOR NOTI CE TO PROPERTY OWNE RS , I DE NT-
I FY PROPERT I ES WITll GREATER THAN I " ME TER
S I ZE & INPUT TO DATA BASE FOR NOT I CE
~~ S~RESE NTAT J ON ON DISTR I CTS
NANCE AND SET
FEE SC HED ULE
ADOP T RE PORT
AND AUT HOR I ZE
COLLECTION OF
USER FEE ON
TAX B I LL
(!iEP ~RE_ ~O T I CES ~-PROPERTY OWNERS ;========='-~~~~~~~~~~~~~~~
ME DI A, SERV I CE AND PUBLIC GRO UP S
PRINT NOTICE-iO°P ROPERTY
OWNERS RE USER rEE REPORT
·-~----------
[~D~ESS , SOR T & MA I L NOT J CES
PUBLI SH L EGA Li
NOTICE -·· ---·--· :J" NEWSP APER ADS RE USER FEE
PROPO SA L, PUBL I C I NFORMAT I ON
MEETI NG DATES & HEAR I NG
DATES
I -· --
CONDUC T PUBLIC
INFORMATION
MEFTI NGS
q /UL/0 1
4/29/8 1 Re v ise d
JU NE 15
PUBL I Si l l
ORDI N~CE .
JULY 8
ADOPT
BU DGE T
IE ~~ _PROGRAMM I l~·~~-p~~~~~~s~~~ .rni~~·l DEjARC~~~·~~.A~GE -TAP .~ TO squNTY ~I TOR
----------·-----· -
J
------------·--. ----------·------·------··-· -·----·-·
PREPARAT I ON , REV I EW AND ADDPT JOll OF DI STR ICT BUDGET & F ILING WITll COUN T Y AUD I TOR ·------------·--------
A-2 APR IL 29 MAY 13 MAY 20 JUNE 1 JUNE 2 JUNE 3 JUNE 9 JUNE 11 ,17&23 JUUE 30 JULY 10 JULY 8
·-
AUG UST 10
.. --~·-1
=.=_-_=]
AUGUST 10
("
(A) (B) (C)
A
Est'd Charge @
f.onnected Meter SI ze · ~eters $1.00/Unit
(I) 1" or less 19,925 $34,869
(2) I ~II 412 I ,lf42
( 3) 2" 652 lf ,564
(4) 3" 22 308
(5) 4" 97 2,716
(6) 6" 88 ) 4,928
(7) 8" 40 4,480
(8) TOTAL 21,236 $53,307
A
Est'd Charge @
Connected Heter Size Meters $1. 00/Uni t
(9) I" or less 19,925 $34,869
( 10) Ii" 412 1,442
(II) 2" 652 4,564
( 12) 3" 22 308
( 13) 4"
( 14) 6"
91 I 2,716
88 t 4,928
I
( 15) 8" 4o I I 4,480
(16) TOTAL 21,236 ii $53,307
(D)
(
COUNTY SANITATION DISTRICT NO. 5
USER CHARGE RATE CALCULATION SCHEDULE
(E) (F) (G)
$17 A 1 Ch $26.25 Hin. A1 1 Ch
Annual Charge Total Annual Annual Charge Total Annual
Per Connection Char~es Per Connection Charges
$ 17.50 $348,688 $ 26.25 $523,031
35.00 llf ,i.20 52.50 21,630
70.00 1*5,640 105.00 68,460
140.00 3,080 210.00 4,620
280.00 27, 160 420.00 40,740
560.00 49,280 840.00 73,920
I, 120.00 44,800 1,680.00 67,200
$533,068 $799,601
$52.50 Hin. A I Ch -$61.25 Hin. A -I Ch
Annual Charge Total Annual Annual Charge Total Annual
Per Connection Charges Per Connection Charges
$ 52.50 $1,046,063 $ 61.25 $1 ,220,406
105.00 1f3,260 122.50 50,470
210.00 • 136,920 245.00 159,740
li20.00 9,240 490.00 10,780
840.00 l 81,480 980.00 95,060
;
I ,680.00 ! 147,840 1,960.00 172,480
I
I
3,360.00 I 134,400 I 3,920.00 156,800 ' ; I
; !. $1,599,203 ,, $1,865,736
i ii ;•
(' .1
lt/23/81 Rev.
(H) (I) (J) (K)
$3 $4 ---,....
Annual Charge Total Annual Annual Charge 1ota1 Annual
Per Connection Charges Per Connection Charges
$ 35.00 $ 697,375 $ 43.75 $ 871,718
10.00 28,840 87.50 36,050
140.00 91,280 175.00 114, 100
280.00 6, 160 350.00 7,700
560.00 54,320 700.00 67,900
1,120.00 98,560 ',400.00 123,200
2,240.00 89,600 2,800.00 '12,000
$1,066, 135 $1,332,668
$70.00 Hin. A I Ch $78
Annual Charge Total Annual Annual Charge Total Annual
Per Connection Charges Per Con nee t ion Charges
$ 70.00 $1,394,750 $ 78.75 $1,569,094
140.00 57,680 J 157.50 64,890
280.00 102,560 I 315.00 205,380
560.00 I 12,320 630.00 13,860
I
1,120.00 l 108,640 1,260.00 • 122,220 I
i
j
2,240.00 I 197, 120 2,520.00 221,760 I .
I ' I I I li,480.00 179,200 5,0lio.oo 201,600 ,.
$2,132,270 $2,398,804
I
COUNTY SAN ITAT i<. .. DISTRICT NO. 5 4/!. 3 1 Rev ised'
SCHEDULE OF DISTRICT COhLECTION SYSTEM PROJECTS
Proj ec t Total , 198 1-82 1982-83 1983-84 1984-85 1985-86
1. Radio Link e d Tel e metry System 60,000 ( F) 60,000
2. Back Bay Gravity Sewe r 1'100 '000 ( F) 1'l00 '000
3. Coast Hwy. Force Main, Upper
Newport Bay to Rocky Point Pump 800,000 ( n I 800,000
4. Upp er New po rt Bay Cro ss in g (a) 500,000 ( F) I 500,000
5. B~v Bridge Pump Stat i o n
Impro veme nt s 400,000 I 400,000
6. Coast Hwy. Force Ma in, Newport
Blvd. to Plant No. 2 (s l ip 1 ining) 2 '062 '000•'< (P) I 600,000 1 ,462,000
7, Li do, 14th Street & A Street
Pump Station I mprovements 200,000 200,000
8. Rep l ace Rocky Point Pumps 80,000 ( F) 80,000
9, Rep l ace Bitter Point Pumps 40,000 40,000
10. Replace Portions of Bay s ide Drive
Sewer and Construct Extension 1 ,000 ,000 I 1'000' 000
11. S l ip Line Balboa Trunk, Lido to 11 G11 2,400,000 400,000 1,000,000 1 ,000,000
12. Bayside Drive Trunk Sewer, Bayside
Drive Pump Stat i on to Corona De l
Mar Pump Station l ,350 ,000 I l ,3 50,000
13 . Miscell a neou s 250 ,000 50,000 50,000 50,000 50,000 50,000
10,242,000 I 3,510,000 l ,832 ,000 l ,450,000 2,400,000 1 ,050,000
•'< District No. 6 s hare excluded from project estimates.
( F) Fu 11 y Funded
(P) Partially Funded $968,000
EXPENDITURES
24 Sha r e of J oint Works Treatment Plant 1'716' 000 1,226,000 1,334,ooo 691 ,000 503,000 I 5,470,000
2 5 District Co l lection System 3 ,5 10 ,000 1 ,832,00 0 1 ,450,000 2 ,400,000 1 ,050,000 10,242,000
26 ICR Payments to Federal Governme nt
2 7 Other Expenditures 174,000 24 2,000 234,000 234,ooo 183 ,000 1,06 7,000
28 TOT AL EXP ENDITURES 5,400,000 3,300,000 3,018,000 3,325,000 1 ,736,000 16,779,000
29 Rese r ves & Carry-Over to Next Year 2,371 ,000 520 ,000 (608,000) (2,383,000) (3,3 15,000) (3,315 ,000)
BOND FUND~
30 Re s erves & Carry -O ver From Last Year 26,000 21 ,000 20,000 20,000 19,000 I 26 ,000
REVENUE
3 1 Ta x Levy 19,000 22,000 2li,OOO 22,000 21 ,000 I 108,000
32 Interest & Miscel l aneous I nco me 2,000 2,000 1 ,000 1,000 1 ,000 7,000
33 0 the r Incom e
34 TOT AL REVENUE 21 ,000 24,000 25,000 23,000 22,000 115,000
35 TOTAL AVA IL ABLE FUNDING 47,000 45,000 45,000 43,000 41 ,000 141,000
EXPENDITURES
36 Bond Principal & Interest 26,000 25,000 25,000 24,000 23,000 I 123,000
37 Other Ex penditu r es
38 TOTAL EXPENDITURES 26,000 25,000 25,000 24,ooo 23,000 123,000
39 Rese rves & Carry-Over to Next Year 21 ,000 20,000 20 ,000 19,000 18 ,ooo 18,ooo
40 Next Year 1 s Dry Period Fun d ing Requirements 21 ,000 20,000 20 ,000 19,000 18 ,000 18,000
41 Fund Balance or (De f icit) -o--0--0--0 --0--o-
SUMMARY (Adjusted for Inter -Fu nd Transfers)
42 Reserves & Carry-Over From La s t Yea r 5,810,000 2,832,000 558,000 (1 ,207 ,00 0) (3,851,000) 5,8 10 ,00 0
43 TOTAL REVENUE 3,6li6,000 2,553,000 3,046,000 2,816,000 2' 194 '000 14 ,255,000
44 TOTAL AVAILAB LE FUNDING 9,456,000 5,385,000 3 ,604 ,000 1'609' 000 (1,6 57,000 ) 20,065,000
Li 5 TOT AL EXPENDITURES 6 1624 1000 li 1 827,000 4) 8 11 ,0 00 5,li60,000 4' 191 '000 25 ,9 13,000
46 Rese rves & Carry-Over to Next Year 2,832,000 558,000 (1 ,207,000) (3 ,851 ,000) (5,848 ,000 ) (5,848,ooo)
47 Next Year 1 s Dry Period Funding Requi rements 620 1000 771 1 000 904,000 1,235,000 1,403 ,000 l,403,000
48 FUND BALANCE OR (DEFICIT) 2 ,212,000 (213 ,000) (2, 111 ,000) (5,086 ,000) (7,25 1 ,000) (7,251,00 0)
I .
'.
\ \
l( (( ( ( ( I
SCHEDULE
COUNTY SANITATION DISTRICT NO. 5 4/28/81
STATEMENT OF PROJECTED CASH FLOW .
FISCAL YEARS 1981-82 THROUGH 1985-86
A B c D E F G H
LI NE DESCRIPTION 1981-82 1982-83 1983-84 1984-85 1985-86 5-Year Total
OPERATING FUND
Reserves & Carry-Over From Last Year 617,000 440,000 18,000 (619,000) (1,487,000) 617,000
REVENUE
2 Share of 1% Tax Allocation 923,000 1 ,016,000 l ' 117 '000 1,229,000 1,352,000 5,637,000
3 Fees 9,000 11 '000 12,000 14,ooo 16,000 62,000
4 Interest & Miscellaneous Income 89,000 53,000 2,000 144,000
5 Other Revenue
6 TOTAL REVENUE 1 ,021 ,000 1,080,000 1 '131 '000 1,243,000 1 ,368,000 5,843,000
7 TOTAL AVAILABLE FUNDING 1 ,638,000 1., 520, 000 1, 149,000 624,ooo (119,000) 6,460,000
EXPENDITURES
8 Share of Joint Works M & 0 798,000 1'046' 000 1,255,000 1'506, 000 1 ,720,000 6,325,000
9 Collection System M & 0 and Other Oper. 400,000 456,000 513,000 605,000 712,000 2,686,000
10 Other Expenditures
11 TOTAL EXPENDITURES 1 '198 '000 1,502,000 1,768,000 2' 111 '000 2,432,000 9,011,000
12 Reserves & Carry-Over to Next Year 440,000 18,000 (619,000) (1,487,000) (2,551,000) (2,551,000)
13 Next Year's Dry Period Funding Requirements 599,000 751,000 884,000 1,216,000 1,385,000 1 ,385,000
14 Fund Balance or (Deficit) (159,000) (733,000) (1,503,000) (2,703,000) (3, 936 '000) (3,936,000)
CAPITAL FUND(S)
15 Reserves & Carry-Over from Last Year 5, 167,000 2, 371 '000 520,000 (608,000) (2,383,000) 5' 167 '000
REVENUE
16 Construction Grants' 1,573,000 752,000 916,000 363,000 157,000 3,761,000
17 Fees: Connect Jon 387,000 388,000 388,000 488,000 623,000 2,274,000
18 Other 7,000 7,000 7,000 7,000 7,000 35,000
19 Sale of Capacity Rights 17,000 17,000 17,000 17,000 17,000 85,000
20 Interest & Miscellaneous Income 620,000 285,000 62,000 967,000
21 Other Income ) 500,000 675,000 1,175,000
22 TOTAL REVENUE 2,604,000 1,449,000 1,890,000 1,550,000 804,000 8,297,000
2~ TOTAi A\/A I I ARI I=' t:lllt..1 n I t.I I'.? .., ..,..,, """ """ n"'"" ~---·-----
EXPENDITURES
24 Share of Joint Works Treatment Plant 1 '716 '000 1,226,000 1,334,ooo 691,000 503,000 I s.1i10. ooo
25 District Collection System 3,510,000 1,832,000 1,450,000 2,400,000 1,050,000 10,242,000
26 ICR Payments to Federal Government
1742000 2421000 27 Other Expenditures 2341000 2341000 183. QQQ I l • 062. QQQ
28 TOTAL EXPENDITURES 5 2 400 2 000 J 1 J00 1000 310181000 3a32S100Q 1.736,00Q L6_ .. 129 .. o on
i
29 Reserves & Carry-Over to Next Year 2,912,000 1,880,000 1 ,574,000 494,ooo 143,000 143,000
BOND FUND(S)
30 Reserves & Carry-Over From Last Year 261000 211000 201QOQ 20.0QQ 19.000 I ----26 .. 000
REVENUE
31 Tax Levy 19,000 22,000 24,000 22,000 21,000 I 108,000
32 Interest & Miscellaneous Income 2,000 2,000 1, 000 1'000 1 ,000 7,000
33 Other Income
34 TOTAL REVENUE . 21 '000 24,000 25,000 23 2 000 22 1 000 I 11sI000
35 TOTAL AVAILABLE FUNDING 47,000 45,000 45,000 43,000 41, 000 141 t 000
EXPENDITURES
36 Bond Principal & Interest 26,000 25,000 25,000 24,ooo 23,000 I 123,000
37 Other Expenditures
38 TOTAL EXPENDITURES 26 2 000 25 1 000 221000 241000 231000 123.QCQ
39 Reserves & Carry-Over to Next Year 21 '000 20,000 20,000 19,000 18,000 18,000
40 Next Year's Dry Period Funding Requirements 21 2 000 20 1 000 20 1 000 1~1000 181000 181000
41 Fund Balance or (Deficit) -o--o--o--o--o--o-
SUMMARY (Adjusted for Inter-Fund Transfers)
42 Reserves & Carry-Over From Last Year 5,810,000 3,632,000 2,801,000 2,653,000 l ,939,000 5,810,000
43 TOTAL REVENUE 4,446,000 3,996,000 4,663,000 4,746 2000 4 2 038 2 000 21 2 889 1 000
44 TOTAL AVAILABLE FUNDING 10,256,000 7,628,000 7,464,000 7,399,000 5,977,000 27,699,000
45 TOTAL EXPENDITURES 6,624,000 4,827,000 4,8112000 524602000 4 z 191 '000 25 2913 2 000
46 Reserves & Carry-Over to Next Year 3,632,000 2,801 ,000 2,653,000 l ,939,000 1,786,000 1,786,000
47 Next Year's Dry Period Funding Requirements 620,000 771'000 904 2 000 1 2 235 2000 1 2 403 2 000 l 1 40~1 000
48 FUND BALANCE OR (DEFICIT) 3,012,000 2,030,000 1,749,000 704,000 383,000 383,000
User Fees -Minimum Annual Charge 26.25 43.75 43.75 52.50 52.50 218.75 --· -Allocate to Operating 259,000 578,ooo 674,ooo 1'093 ,000 1,077,000 3 ,68 J ,000 -Allocate to Capital 541'000 755,000 6591000 506 2 000 5221000 2 19?tooo TOTAL A~('IAL USER CH( ~E 800,000 1,333,000 .Li( ',000 . 1'599 '000 1 ,599,000 , JOO l..oi!
(. ( ( ( ' •1 • r
Schedule 2
4/28/81
COUNTY SANITATION DISTRICT NO. 5
STATEMENT OF PROJECTED CASH FLOW
~ FISCAL YEARS 198l/82 THROUGH 1985L86
A B c D E F G I H
LINE DESCRIPTION 1981-82 1982-83 1983-B!i 1984-85 1985-86 5-Year Total
OPERATING FUND
Reserves & Carry-Over From Last Year 617 2 000 6!12 1 000 90 l 1 000 l 1 QS9. QQQ 1.426.000 I 617,000
REVENUE
2 Share of 1% Tax Allocation @ 10% 923,000 1,016,000 1 ' 117' 000 1,229,000 1,352,000 5,637,000 3 Fees 268,000 589,000 686,ooo 1,107,000 1,093,000 3,743,000 4 Interest & Miscellaneous Income 89,000 99,000 123,000 142,000 186,000 639,000 5 Other Revenue
6 TOTAL REVENUE 1,280,000 1 '704' 000 1, 926 2 000 2 2 478 1 000 2 1 631a000 I j 0 I 0 j 2 I 000
7 TOTAL AVAILABLE FUNDING 1'897' 000 I 2,403,000 2,827,000 3 2 537 2000 4,057,000 10,636,000
EXPENDITURES
8 Share of Joint Works M & 0 798,000 1,046,000 1,255,000 1,506,000 1 ,720,000 I 6,325,000
9 Collection System M & 0 and Other Oper. 400,000 456,000 513,000 605,000 712,000 2,686,000 10 Other Expenditures
11 TOTAL EXPENDITURES l '198 '000 1,502,000 1,768,000 2' 111 '000 2,432,000 9 2 011 2000
12 Reserves & Carry-Over to Next Year 699,000 901 ,000 1,059,000 l ,426,000 1'625' 000 1'625, 000 13 Next Year's Dry Period Funding Requirements 5991000 ZSlaOOQ 88~.ooo ] '2] 6' QQQ ] t 3 85 I 000 l,385,CCC 14 Fund Balance or (Deficit) 100,000 150,000 175,000 210,000 240,000 240,000
CAPITAL FUND(S)
15 Reserves & Carry-Over from Last Year . 5' 16 7' 000 2,912,000 12 880 2 000 ...L..274,000 494.ooo I 5.167.000
REVENUE
16 Construction Grants 1,573,000 752,000 916,000 363,000 157,000 3,761 ,000
17 Fees: Connection 387,000 388,000 388,000 488,ooo 623,000 2,274,000
18 Other 548,ooo 762,000 666,000 513,000 529,000 3,018,000
19 Sale of Capaci~y Rights 17,000 17,000 17,000 17,000 17,000 85,000
20 Interest & Miscellaneous Income .. 620,000 349,000 225,000 189,000 59,000 1,442,000
21 Other Income 500,000 675,000 1.1zS.QQQ
22 TOTAL REVENUE 3 2 145 1 000 2 1 268 1 000 2 a121 ooo 2 1 245.QOQ l .3aS.QQQ 11aZ22a000
23 TOTAL AVAILABLE FUNDING 8.312.000 'l.180.000 4 _ r;qLOOO ~-81q_onn 1 81q_nno 16.922.000
MEETING DAT E April 29 , 1981 TI;1E 5:30 p .rn . DISTRICTS
DISTRICT 1
(SA LTAREq .. I) ... SHARP ...... ------
(YAMAMOTO) •.... WARD,J •.... ------
(CRANK) .••••••• HUTCHISON •. ~ ----
(R ILEY ) •••..••. STANTON •••. ------
DISTRICT 2
~FRIED).~ ...•.. WEDAA ....•. ----__
SEYMOUR •.•••. ROTH •...••. _____ _
WINTERS ...• _ . BORNHO FT .•. _____ _
(GAMB INA •1 •.•. FOX •••.•••.
(ECKENROD E; · • • ·HOLT • • • • • • • ------
(ODLUM) · • • • • · · ·KAl'IANA~I • • • == == ==
(w I EDER) · • • · · · ·NEST AND E • • •
tHOLLJimEN) ···NIELSEN···· ------
(CU LVER)······ ·P ERRY······ ------
CsEY ER ). ·······SMIT H······ ------
lCORBETT) ....•. WARD,B •.•.• ------
(WAR D,J ) •••.•.• YAMAMO TO •.• == == ==
DISTRICT 3
(CO LLINS ) •••.•. VAN DYKE ... ------
(RO l~AN) ••.••.•• EVANS ....•• ------
(HOLLIND EN ) •... AD LER .••.•. ------
(ROGET) ...•.••. CORBETT ••.• --__ --
(PERRY) .•••.••• CUL VER ••.•. ------
KIRK PATRICK) •• FINLAYSON •. _____ _
MANP IC ) .•••••• FINLEY ••••• _____ _
FOX) •..•.••.•. ISLES •••••• _____ _
SEITZ) •.•.•.•. LASZLO •••..
.DAV IS ) .••••... REES E ••••••
(S EYM OUR) .•••.• ROTH •••..•• ======
(ZOMMICK) •.••.• SYLVIA ••.••
(ROMAGNINO) .•.• WH EEL.ER •.•. ------
(NES TANDEL •... WIEDER ••.•• ------
(BORNHOfT) ••... WINTERS •••• ------
(WA RD,J) •••••.• YAMAMOTO ••• ------
DISTRICT 5
(MA URER ) ••••••• HEATHER •••• :;:.----
(STRAUSS) ••.••. COX • • • . • . • ----
(STANTON). ••.•• RILEY...... ----
DISTRICT 6
(CRANK).~ ..••.• HUTCHISON .. _____ _
(HEATH~RJ .••••. PLUMMER ••••
(RILEY) •••••••• STANTON···· == == ==
DISTRICT 7
(B EYER ) .••• \ •.• SMITH ••••.• ------
(SA L TAREl-LI J ••• EDGAR -••••• ------
(HEATHER) •••.•• HART. • ••••• ------
lW I EDER) ...••.• NEST ANOE· • , ------
ANT HONY, A) ••.• VA RDOULIS-. ------
HANSON) •••••.• WAHNER ••... ------
YAMAMOTO) ..•.. WARD,J •• · •. ------
DISTRICT 11
(BAILEY ) ..•..•. PATT INSO N .. ------
(MA CALLIS TER ) •• BAILEY .••.. ------
(N ES TAND E) ...•. WIEDER ••••. ------
2/11/81
JOINT BOARDS Newport Beach City Hall Annex
~HOLLINDEN) ..... AD LE R •. ·:.·----
MACALLISTER) ... .BA I LE Y ..••. ----
WINTERS) ••• · ... BCRNHO FT ••• ----
(ROGET) . • • • • • • · -COR BETT • • • • ----~STRAUSS ) ••. · ••• COX ..••.• ·• ----
t ERRY) • ••·•• •• -CULVER •.••• ___ _
1SAL T ARELLI i ... -EDGAR .••• • • __ --
~ROWAN) ••...••. -EVANS.····· ___ _
(K l RKPATR I CK).·· ·FINLAY SON • · ___ _
CMAND I c) ........ FINLEY · • · · ·
(GAMDI NA ). ··• •• -FOX········ ----
<H EATH ER ) ······-HART······· ----
CMAUR ER )._ · • ·····-HEATH ER • • • • ----
(EC KENROD E ).···· ·HOLT ······.----
(cRAtiK) · ·······-HU TCH ISON.·==== ~FOX ) . , .• • .• • ... { SL ES •••.••
ODLUM) · . • • · • .. -KAWANAM I ••• == ==
S EITZ ) .•••• • .• -LASZLO ••••.
(WI EDER) · • • • · • · ·NES TAND E ••• ----
(HOLLI ~mENi ·· .. -NIELS EN •..• ----
(BAILE Y) .•.•...• PATTINSON .• ----
(CULVERl ••••...• PERRY •••.•• ----
(HEATHER) ..••..• PLUMM ER .••• ----
(DAV I S ) ....•.... REESE •.•.•• ----
(STANTON) ••••••• RILEY •.•.. ·====
(SEYMOUR)······ ·ROTH ••••.. ·----
(SA LTARELLI ) .... SHARP ...•. ·----
~BEYER) · ·······-SMITH •.•.•. ----
RI LEY)········ -STANTON •.• ·----
ZOMMICK) ······-SYLVIA ·· •• ·----
(COLLINS )······ ·YAN DYKE···----
(AMTHONY ,A)···· -VflRDOULIS · ·----
(HANSON)······· .\~AH NER·····----
!CORBETT ) ..•.•.. WARD ,B •..•• ----
YAMAMO TO)····· ·WARD,J • • · • ·----
FRIED )········ -WEDAA · · · · • ·----
ROMAGNINO) ····-WHEELE R····----
(NESTANDEi) ·····-W I EDER ·····----
(BORN HOFT ) ·····-WINT ERS···· ----
(WAR D,J ) ········YAMAMOTO ···--
OTHERS
HARP ER· · · • · _::::_ SYLVESTER ··~ LEWIS······~
CLARKE·····--
BRm'IN· · • • • • AN DERSON ••• --
BAKER •••••• --
CONATSER •••
DAW ES ...•.•
FATL AN D ••••
YO UNG ••••••
WOODRUF F •• • ..JL:::::_
HOHEN ER .... __
HOWAR D· •• ·•
HUNT •...•..
KEI TH ..•... __
LYN CH •..... __
MARTINSON •• __
ST EVENS ••.. __
... "S\ N\ fl'\ f>.. 'Y-. I I t-J
•
C?) '.t~L ~ slf (,. d li v sL ~
fuc_ tf" ~Q L ~ fi -be ltAf!
~ ,(:-~ 3 (Mb 'OJ, I 6" ·11 J) i'>!f Q.;i-
I"' ~
..
... _. ... I l
.> . -..
-;: .. -. I
T • • .
~ 1 "' . • t ..
J
.
*' •
4
I
,..;. ~ .lit ,,._.,!.I: .. -1"-
_,
~
... ;,.:. t
..
I • . . .. ... . . •
...._
.. ..
I •
•
-. ---
COUNTY SANITATION DISTRICT NO. 5
OF ORANGE COUNTY, CALIFORNIA
MINUTES OF ADJOURNED REGULAR MEETING
April 29, 1981 -5:30 p.m.
Newport Beach City Hall Annex
3330 Newport Boulevard
Newport Beach, California
Pursuant to the adjournment of the adjourned regular meeting of April 13, 1981,
the Board of Directors of County Sanitation District No. 5 of Orange County,
California met in an adjourned regular meeting at the above hour and date, at the
Newport Beach City Hall Annex.
The Chairman called the meeting to order at 5:30 p.m. The roll was called
and the Secretary reported a quorum present.
DIRECTORS PRESENT: Jacqueline Heather (Chairman), John Cox, Jr.
and Thomas Riley
DIRECTORS ABSENT: None
STAFF MEMBERS PRESENT: Fred A. Harper, General Manager, J. Wayne
Sylvester, Secretary, Ray Lewis, Chief
Engineer
OTHERS PRESENT: Thomas L. Woodruff, General Counsel, Jim
Martin and Hal Mills
* * * * * * * * * * * * * * * * * *
Report on Phase 1 of
Coast Highway Trunk Study
The Chief Engineer reported on the findings
of Shaller and Lohr, the District's consulting
engineer engaged to evaluate the portion of
the Pacific Coast Highway Trunk Sewer System from Dover Drive to the Rocky Point
Pump Station. Mr. Lewis advised the directors that it appears as if an abandoned
36" and 33" pipe now in place can be slip-lined at approximately one-half the
cost of paralleling the existing force main from Dover to Rocky Point.
The Chief Engineer also briefly reviewed the work to be completed on the portion
of the system under the Upper Bay Channel and the work being completed east
of the channel to the Bay Bridge Pump Station in conjunction with construction
of the new Pacific Coast Highway bridge over the Upper Bay Channel by Cal Trans.
Authorizing the Selection
Cormnittee to negotiate for
design of Rehabilitation of
Pacific Coast Highway Trunk
from Dover to Rocky Point
Sewer from Dover Drive to Rocky
It was moved, seconded and duly carried that:
The Selection Committee be, and is hereby,
authorized to negotiate with Shaller and Lohr
for preparation of plans and specifications for
Rehabilitation of Pacific Coast Highway Trunk
Point Pump Station.
Approving pre-qualification
of contractors for bidding on
Contract No. 5-24 and 5-24-1
It was moved, seconded and duly carried that:
Pursuant to the pre-qualification process
conducted by the Districts, the following ~
firms are hereby declared
Trunk Sewer, Contract No.
Canyon Drainage Area (Big
as eligible to bid on construction of the Back Bay
5-24, and the Enhancement Program for the Big
Canyon Marsh Restoration Project), Contract No. 5-24-1:
John A. Artukovich Sons, Inc.
Clarke Contracting Corporation
K.E.C. Company
-Azusa
-Compton
-Corona
Kordick Construction -Irvine
Pascal & Ludwig, Inc. -Upland
Steve P. Rados, Inc.
Sully-Miller Contracting Co.
-Santa Ana
-Orange
Approving plans and specs
for Contract No. 5-24A
It was moved, seconded and duly carried:
That the Board of Directors hereby adopts
Resolution No. 81-61-5, approving plans and specifications for Purchase of
Approximately 5,000 Feet of 24-Inch Ductile Iron Pipe and Fittings, Contract
No. S-24A, for use in construction of the Back Bay Tnmk Sewer, and author-
izing the General Manager to establish the date for receipt of bids.
A certified copy of this resolution is attached hereto and made a part
of these minutes.
Authorizing solicitation of Following a brief report by the Chief Engineer
proposals for Contract No. S-24B it was moved, seconded and duly carried: ~
That the staff be authorized to solicit proposals from Vulcan Painters, Inc.
and Bit-Co for Installation of Protective Coating in Back Bay Trunk Sewer
Pipe, Contract No. 5-248, which was previously purchased and has been
stored at Plant No. 1 since 1976.
Discussion re User Charge
Implementation
Staff presented an update on efforts to
establish a user fee program and a revised
timetable for implementing user fees to be
collected on the annual property tax bill and briefed the Board on the status
of the proposed program.
Secretary of ·the Board of Directors
County Sanitation District No. 5
of Orange County, California
Chairman of the Board of Directors
ColDlty Sanitation District No. S
of Orange County, California
-2-