Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1971-03-16
COUNTY SANITATION DISTRICTS OF ORANGE COUNTY, CALIFORNIA P. 0. BOX Bl 27. FOUNTAIN VALLEY, CALIFORNIA 92708 10844 ELLIS AVENUE (EUCLID OFF-RAMP, SAN DIEGO FREEWAY) t~arch 11, 1971 TO: MEMBERS OF THE BOAHD OF DIREC1I'ORS OF COUNTY SANITATION DISTRICT NO. 7 Gent~emen: TELEPHONES: AREA CODE 714 540-2910 962-2411 Pursu~.;.at to 3.djournment of the regular mc·eting held Ma.rch 10, 1971.~ the Board of Directors of County Sani ta.tion District ;~o. 7, wi.lJ neet in an adjourned regular meeting: Tuesday, March 16, 1971 at 5:30 p.m. 10844 Ellis Avenue Foun ta.in Va1ley ~ C::ilif'orni&. II P. 0. Box 5175 MANAGER'S AGENDA REr:io;rr County Sanita tion Districts of Orange Co unty, Californ ia 10844 Ellis Avenue Fount.Jin V<Jlley, C<Jlif., 92708 Telephone s : DIST RI CT NO. 7 March 12,, 1971 ADJOURNED REGULi\R MEE'I'ING March 16, 1971 -5 :30 p .m. Areo Code 7 14 540 -29 10 962 -24 11 No. 5 -REQUEST OF THE CITY OF SANTA A NA TO MODIFY THE DISTRICT NO . '{ Mfl.STER PLAN OF SUBTRUNK SEHERS TO DELE TE THE BRISTOL STREE'r SUBTRUNK SE'dER NORT HERLY OF SUNFLOHER AVENUE ,, AND ADD THE PV\Z/\ DRIVE S U13TRU.f\!I<: SEWER. Pursuant to the instructions of the District 1 s Board of Directo:cs on 1"1arch 10th_, the staff' has r e viewed the above menti oned request of tl1e City of Santa Ana,, and we rec omm end that said request be approved subject to resolving tl1e following ma:tters : (1 ) Tha t the District 1 s c n ginec r8 con cur with the sta ff of thE:: S a nta An a Pub lic Works Depar tme nt tLa t this p:t o posed c ha:Dge will r esult in b e tter service to t he ar ~a · (2) Tl1 at the District 1 s General Counsel d ete rmines that approval of this request will n ot violate the intent of the District 's existing subtrunk policy or set any precedent (3) That an agr eement b e consummate d between the District and the City of Santa Ana re - lat ed to the fundin..g of said subtrunk sew~r and relieving the Di strict of further respon - sibility fo r se rvi ng the area which would have b een served by the Bristol Subtrunk Sew e r (4) That the Plaza Subtrunl<:. Sewer be.con - structed in lie u of the Bristol Subtrunk Sewer in acco rd a nc e with the D:Lstri ct 1 s enginee r s 1 Modification Report for the .Master Pla.n of Subt r unl<: Sewers authorized March 10,, 1971 (5) That the District not par t icipate in the cons truction of any facility bet1·1ee n Bear Street and Plaza Drive in Sunflm·re r i\ venue , as t he Dist rict is constructing a paralleling sewer thi s year ( Su..'1flower Interceptor Sewer, Contract No. 7-6-2). It has been our experi ence that when developm ents have r equired sewerage facilities i n advance of the planned c o nstruction of the Dist rict, the develope r s have elected to con- strurit interim faci lit i es rather than de l ay their projects . For example, a pumping station on Sunflo wer Avenue was constructe d by the Pacific Investment Company at th e lower end of the So ut h Coast Plaza Subtrunk Extens i on to pump into the existing subtrunk sewer. This facility is currently being operated and maintained by the City of Santa Ana and will continue t o operate at no expense to th e Di strict unti l compl eti on of t he Sunflm.rer Interceptor Sewe r . There have a l so b een several i nsta~ce s within the Irvine Industrial Complex where the developers have absorb ed certain costs because District f aci li- ties were n ot immediate l y available . In an effort to expedite the sewer construction, the staff recom .. 'Ylends that follm·1in g comp l etion of the agreeme nt with th e City of Santa Ana c oncerning financing of the recommended fac i lity, the Dj_strict e nter into a Ma ste r Plan Re imbur s ement Agre e ment v1j_ th the developer, similar to the contract for purchase of the South Coast Plaz a, Subtrunk Extens:Lon . This agreeme nt 1vould allow· the deve l oper 's enginee r to prepare plans and specifications subject to approval of the District's engineer, and permit the develope r to award a contract for construction in acc ordance with the public bidding procedures establ ished by t he District , at the earliest possible time . No . 6 -Included with the agenda mat erial is a staff report on t _he Dist ricts 1 funding c apabilities for construction of the Sunflower and Red Hill Int erce ptors . The r eport clearl y indicates that i f State and Federal assistance is forthcoming on Reach 1 of the Sunflower Interceptor (Treatment Plant No . 1 to Bear Street), the District could finance the faci lities south of the Santa An a Freevmy, as provided for in the March 1 970 bond election , with - out sellin g additional authorized bonds . It is the staff's recommendation that t he Board defer consid e ra - tion of s e l ling additional bonds pending not ific ation (no t later t han J uly 1) by the Stat e and Federal agencie s that a cons truction g r ant has been offered or denied for Reach 1 of the Sunfl ower Int ercept or . Fred A . Har.::_J e r PAH: j Gen e ral Manage r cc: C. J. Segerstrom & Sons Di r ec to r of Pttb l ic Works> City of Santa Ana THf CIT~ Of SfinTn nnH CALIFORNIA Corner of Main and Third Streets (714) 834-4931 .Please address replies lo: March 4, 1971 Mr. Fred Harper, General Manager Orange County Sanitation Districts P. O. Box 8127 Fountain Valley, California 92708 Dear Fred: Department of Public Works City Hall Santa Ana, California, 92701 SUBJECT: DISTRICT SEVEN SUB-TRUNK SEWER IN PLAZA DRIVE, SUNFLOWER STREET TO MAC ARTHUR BOULEVARD The engineers for C. J. Segerstrom & Sons, Toups Engineering, have developed a preliminary study for construction of a sub-trunk sewer to serve approxi- mately 125 acres of future development north of Sunflower Avenue between Bear Street and Bristol Street. This is not the Raitt Street sub-trunk that is in your master µlan. The sewer as proposed would be constructed in Sunflower Avenue easterly from Bear Street to Plaza Drive, a new proposed north-south street between Bear Street and Bristol Street, thence north in Plaza Drive to MacArthur Boulevard, and would consist of about 3,000 feet of pipe ranging from 10-incli to 15-inch in size. The City of Santa Ana has no objection to this being a District 7 sub-trunk as long as it is under~tood that all frontage· along the sewer will be assessed. We believe the City of Santa Ana has sufficient District 7 funds to handle the project although an estimate of cost has not been developed as yet. It is suggested that this sub-trunk project be handled as was the last one east of Bristol. Would you prepare a cooperative agreement Rnd forward it co us? Sincerely yours, Qt?vV' Ronald E. Wolford Director of Public Works cc: C. J. Segerstrom & Sons Toups Engineering (Tom Madden) COUNTY SANITATION DISTRICTS OF ORANGE COUNTY, CALIFORNIA P. 0. BOX 8127, FOUNTAIN VALLEY. CALIFORNIA 92708 1DA44 ELLIS AVENUE (EUCLID OFF-RAMP, SAN DIEGO FREEWAY) Doyle .En,slnecril~G P. O. B~;~ 178 Sar~t~~ l'm:1, Cnli forn1J. 92702 Attention: Nr. Conrad Hohenc~:i", Jr o · · Su\Jj cct: Propo:>cd Pl~zn D::i vc Bub trunk. S~~~;.cr - County Gnni tat1.on District !lo. '7 TELEPHONES: AREA CODE 714 540-2910 962-2411 Barch 11 ~ 19T~ .. On ;.:urch J.O tiY) Board of D).rcet.or!3 of Count.y .Sr!Ditntion Diat~:1ct J;o. 7 tl:truct(::d tho pr.e;J:-i.1-;:1t:ton of a bX'J.of report on the cng.tnc~r1n~ n:;j):::cts oi' t~1c ~iJo·rc~ pro2:00c'.l nu:.>t:rn:~:~ ~c'::er. A co;;y O •f' rl lr)T'-7•~'" ,~')~".''\') .~ ..... ·,ph }J ('rl"'\·•1 th'\ fLl-(·1r (".".'°> {~'!""1't') "-')•"t r~f"'l~j.~r·••\1]v J. c ...... vv ...... J.. '-o[..l...,l'-\.· .. -•. _ ..... _ -·-,· •·• i...1 •• _ .,_,,,, ""-"~"'! .,,.,L a.....,:._,.."' l~ 1.~ · ... <.,_,-.......l,..'-" <...'-··• -J de;; c;ritiin~ the propo:J~d facili t.y is enc lonccL FAH:FGn:sg Enclm.n~rc cc to: Director of Finn.nee Engineering Dcpnrtmcnt , COUNTY SA1'JIT A.TI ON .DISTRICTS OF ORANGE COUNTY, CALIFORNIA P. 0. BOX Bl 27, FOUNTAIN VALLEY, CALIFORNIA 92708 10844 ELLIS AVENUE (EUCLID OFF-RAMP, SAN DIEGO FREEWAY) Mr. C. Arthur ·Nisson Miller, Nisson & Kogler Attorneys at law 2014 North Broadway Santa Ana, California March 12, 1971 Re: Agreement with the City of Santa Ana relating to the Construction of' the Proposed Plaza Subtrunk Se11er Northerly of Sunflm·rer Avenue Enclosed :is a copy of a staff report to the District TELEPHONES: AREA CODE 714 540-2910 962-2411 No. 7 Board of Directors concerning a proposed modifi- cation of the District's Master Plan of Subtrunk Sewers. The request of the City of Santa Ana to modify the Master Plan will be considered by the Board of Directors on March 16th, and the staff is attempting to assemble as much information as possi.ble in time for the meeting. We would appreciate it if we could have your opinion concerning Item (2), and a draft of the agreement referred to in Item (3) to us by Tuesday. FAH:j Enclosure: ~a. Fred A. Harper General Manager Agreement with City of Santa An~ Relating to Construction of the South Coast Plaza Subtrunk Sevrer Extension, Contract No. 7-lF-B (dated 1969) ., II i I I __ J __ _ II 0 ·tJOARDS Of DJ.RECTORS County Sa n ita tion Districts P. C'. Box 5175 of Orange County, Ca lifornia 10841l ~llis Avenue Fou ntain Va lley, Calif., 92708 DISTRICT No. Adjourned Regula r Meeting March 16> 1971 -5 :30 p .m. AGENDA ADJCURN ... i:;l, S ..... 4 COMP & MILEAGE ••... k":':: .. ~ Fil.CS SET UP ...... ~·'.··/ . RDilll UTI ONS CERT IFIED}(.. LEI l l:RS VIR ITTEN ... ~ MINUTES WRITIEN .. \,c.:- MIN UTE S flLED ... V-- (1) Roll Call ® (~ (8) Sec. ret "ll r y Appointment of ffi:l.airman~pro tern > if necessary ~rt _9;J;.-the ~ant Gen~ana~ Re~ of ~ene r aVCo~~ Con sideration of request .of the City of Santa. Ana. to modify the Dis trict's Maste r Plan of sub -trunk sewers to delete the Bri stol Street sub -trunk northerly of Sunflower Avenue and add the Plaza Drive sub -trunk sewer . See page "A" ·--- (a) Report of Engineer (b) (c) (d) Report of General Counsel Heport of staff Consideration of action concezning said request -~ u MP -Re.s · -i=f -P~ ~ r J-:? u .Sr! -Res !J:f. __ · ~ R.l"T o. s~ge.v-st...-o.-y\-Re.~-Fl: Repo rt of staff on financing ca.pa.bili ties fo:t Sunflowe:r-- Interceptor. See page "B" Consideration of motion to adjourn . ., . CALIFORNIA · Corner of Main and Third Streets (714) 834-4931 P/~ase addrc~s ":plies lo: March 4, 1971 Mr. Fred Harper, General Manager Orange County Sanitation Districts P. O. Box 8127 Fountain Valley, California 92708 Dear Fred: Department of Public Works City Hall Santa Ana, California, 92701 SUBJECT: DISTRICT SEVEN SUB-TRUNK SEWER IN PLAZA DRIVE, SUNFLOWER .STREET TO MAC ARTHUR BOULEVARD The engineers for C. J. Segerstrorn & Sons, Toups Engineering; have developed a preliminary study for construction of a sub-trunk sewer to serve approxi- mately 125 acres of future development north of Sunflower Avenue between Bear Street and Bristol Street. This is not the Raitt Street sub-trunk that is in your master plan. The sewet as proposed would be constructed in Sunflower Avenue easte~ly from Bear Street to Plaza Drive, a new proposed north-south street between Bear Street and Bristol Street, thence north in Plaza Drive to MacArthur Boulevard, and would consist of about 3,000 feet of pipe ranging from 10-inch to 15-inch in size. .The City of Santa Ana has no objection to this being a District 7 sub-trunk as long as it is understood that all frontage along the sewer will be nssessed. We believe the City of Santa Ana has sufficient District 7 funds to handle the project although an estimate of cost has not been developed as yet. It is suggested that this sub-trunk project be handled as was the last one east of Bri~~ol. Would you prepare a cooperative agreement and forward it to us? Sincer~ly yours, Oo-vv' Ronald E. Wolford Director of Public Works cc: C. J. Segcrstrom & Sons Toups En~ineering (Tom Madden) ~enda.. Item #-5 -A- ( COUNTY SANITATict. DISTRICT NO. 7 Sunflower Interceptor & Red Hill Interceptor Financing Capabilities REQUIRED PROJECT FIDIDING Project Estimated Total Project Cost (See below) 7-6-1 Sunflower Interceptor, Reach l T-6-2 Sunflower Interceptor, Reach 2 7-6-3 Sunflower Interceptor, Reach 3 and Red.Hill Interceptor Total P~oject FUnding Requirements for District No. 7 AVAIL~BLE DISTRICT PROJECT FUNDING (Excludes Fed. & State Financing) Bond Sale (3.5 Million Sold 7/70) Accumulated Capital Outlay 2,635,000 1,640,000 2,101,000 District No. 7 Share (Hithout Federal & State Financing) 1,845,000 1,230,000 2,101,000 5, 176 .. 000 3,500,000 800,000 4,300,000 Ass~~e Fed. & State . Financing On 7-6-1 369,000 1,230,000 3,700,000 3,500,000 800,000 4,300,000 ( 3-5-71 Ass~~e Fed. & State Financing On 7-6-1 & 7-6-2 369,000 246,ooo 2,101,000 2,716,000 3,500,000 800.000 '4,300.000 Note: The above schedule reflects project costs only. If federal and state participation enables completion of the facilities without selling additional authorized bonds, because of the cash flow situation, it may be necessary for short term borrowing of funds against anticipated tax revenues pending receipt of grant monies. Pro,ject 7-6-1 7-6-2 7-6-3 Bid 2,290,481 Computation of Estimated Project Cost Engr's. Est. 1,425,000 Engr. Fee 104,485 65,315 Add Survey, Insp. Est'd Total & Incidentals Project Cost 240,000 149,000 2,G35,ooo 1,640,000 2,101,000 District #7 Share Percent Amount 70% 100% 1,845,000 1,230,000 2,101,000 5,176,000 Mee tine; Date . 511 lo/7 { DISr~PRICT 1 Gx·iset Miller Porter Battin DISTRICT 2 Just Christie "'!lark ~ulver Stephenson ---Finnell Herrin Sims Smith Wedaa Winn Battin DISTRICT 3 Culver Arbiso Baum Berton Christie Clark Davis Stephenson Green -·- Harvey Herrin Hyde J·ust "'1cWhinney _ ~ims Battin DISTRICT Parsons Hirth Battin DISTRICT Porter Mc Innis Battin 2 6 ~DISTRICT 7 1JISTRICT 11 ~ Shipley Gibbs Battin DISTRICT 8 Boyd Mitchell Ba.ttin ·'""' Herrin Coco Harper Root Magnus Dutton Gomez Griset Zuniga Hileman Machado Schniepp Lewis Hogard Westra Root Magnus Bousman Dutton Shipley Kan el Gris et Kroes en Harper Zuniga Croul Hirth Coco Herrin Hirth Hileman Coen Goldberg Time --·- District 1=f-,tc JOINT OARDS Culver Arbiso Lewis Baum Hogard Berton Westra Christie Root Clark Magnus Davis Bousman Stephenson_1 __ Dutton Finnell Gomez Gibbs Green Gris et Harvey Herrin Hirth Hyde Just Shipley ---Herrin Kanel ---Griset ---Croul Kroes en ---Harper. ---Hirth Mc Innis McWhinney Miller ---Coco Parsons Porter Rogers Shipley Sims Smith Wedaa Winn Battin Hirth ---Coen Zuniga Hileman· ---Machado ---SchniepJ * * * * * * Mitchell Boyd OTHERS Harper --- Brown v Sylvester Carlson Clarke Dunn Finster Galloway Hohener ~ Hunt Keith Lowry Maddox Martinson Nissan V- Piersall Sigler Stevens Crabb V Goldberi \l)a\fon\,QDn ./ W"' f?,y)e~'r i,/ -~ 7 ) AGREEMENT RE LATING TO THE CO NSTRUC TION OF THE SOUTH COAST PLAZA SUBTRUNK SEWER EXTEN - SION , CON'.l'RAC'r 7 -lF-B T HIS AGREEMENT , made i n the City of Santa Ana , Cal i fo rn ia , by and between the CITY OF SANTA ANA , a mun i cipal corporat ion , hereinafter cal l ed "City ," and COUNTY SANITATI ON DI STRICT NO. 7 OF ORANGE COUNTY , a duly existing public car- p oration , h ereinaf ter called "Distri c t". W I T N E S S E T H : WHEREAS , City has by agree ment col l ected and i mpounded sewe r connection fees levied by District, which f unds are to be used for the construction of sewerage facil- i ties to be owned by District wi t hi n said District and within th e City ; and WHEREAS , the City has th ro ugh ifs De p a rtme nt of Public Works, recommended the construc t ion of· a subtrunk sewer in Plaz a Drive , northerl y from Sunflower Street to MacArthur Boulevard , hereinafter called Plaza Drive Subtrunk Sewer ; and WHEREAS , the constructi an .a,~ Plaza Drive Subtrunk Sewer would b e construct ~d i n lieu of th e subtrunk sewer running north er ly in Bristol Street from Sunflower -t,eoo @::,G'eJO Street for a distance of ~,GOB ft . as described in the Master j ~ r ,ooo Pl an of Subtrunk S ewer s for County Sanitation District No . 7 dated J anuary 1967; and WHEREAS , the City and Distri c t have determined that the construction proposed he rei n will be i n the public i nterest . NOW, THEREFORE, IT IS MUTUALLY AGREED as follows: 1. District at its option will undertake to contract for the engineering, construction and inspection of the sewerage facility known as the Plaza Drive Subtrunk Sewer, or purchase said sewerage facility. 2. City will pay District from District's funds impounded by City each and all of its direct costs, in- curred for the work described in Section 1 above, not to exceed the total sum of $ -€!K>'Si50 ,OOO Payments will be made by the City as the work progresses and upon written demand from the District if the District contracts for said facility. If District purchases said facility City will pay said purchase price upon written demand by the District. 3. The Plaza Drive Subtrunk Sewer is generally described as a fifteen and ten inch vitrified clay pipe sewer line with appurtenances to be constructed to District standards and specifications, and will extend northerly from ~) \30 Sunflower Street in Plaza Drive a distance of -3-rOOQ feet more or less. 4. The City agrees to provide such sewerage facilities as may be required by the area within its city limits that would have otherwise been served by the con- struction'of the subtrunk sewer in Bristol Street northerly 1,000 from Sunflower Street for a distance of 3(-900 ft., more or less, to the exten~that ~he facilities of the District do not meet the requirements for local sewerage in that area. IN WITNESS WHEREOF, the parties hereto have here- unto set their hands this __ day of BOARD OF DIRECTORS c ARenda Item No. 0a COUNTY SANITATION DISTRICT NO. 7 OF ORANGE COUNTY (March 16, 1971) · BRISTOL STREET SUBTRUNK SB/VER General History -Subtrunks In December 1961, the board of directors officially adopted the first master plan of subtrunk sewers to service District No. 7. The guiding premise in developing this subtrunk system was an instruction from the board of directors that individual subtrunks should be separated by a one-ha_lf mile minimum distance. The board recognized that there might be certain natural and man-made barriers as well as existing and future street patterns that would preclude a strict geometrical implementation of this pol icy. Therefore, the board also instructed the district manager and the engineer to deviate from the pol icy in those cases where it was necessary in order to meet the intent of the pol icy itself. This original subtrunk system for the most part was designed to handle flows in the northern half of the district where sewage needs were concentrated and where development was taking place. Five short portions of subtrunk beginning at the Gisler Trunk were also included in the 1961 Master Plan because of the impending construction of the San Diego Freeway parallel and northerly of the Gisler Trunk. The Fairview Subtrunk in the southerly portion of the district was also included because of a local need. Between 1961 and 1967, individual subtrunks were added to the system as the .need arose in any given area. In February 1967, the board formally amended the original master plan by adoption of a new expanded ma5ter. plan for subtrunks. BOYLE ENGINEERING ,, . Bristol Street Subtrunk Sewer Report March 161 1971 Page 2 The principal feature of the amended plan WOSJ the addition of new subtrunks to serve the southerly half of the district which at the time was beginning a transition from an agricultural to an urbanized area. It was then considered that this was the ultimate subtrunk system insofar as location WOSJ concerned to serve the then existing district boundaries. In October 1969 1 the board authorized the district engineer to prepare a com- prehensive master plan of trunk and subtrunk systems to serve the district based on full land use within the then existing district boundaries. This report was presented in May 1969 and was adopted by the board in June 1969. Plate 2 in the master plan report depicts the existing master plan as approved by the board. Existing and Proposed Master Pl an Fae i Ii ti es, Bear Street-Bristol Street Area At the present time, District No. 7 operates the Bear Street Subtrunk and the South Coast Plaza Subtrunk to serve the area under consideration. (See Exhibit 11 A 11 .) The master plan proposes the following additional subtrunks and trunk to serve the area: 1. Extension of the Bear Street Subtrunk to MacArthur Boulevard, a distance of approximately 1, 320 feet. 2. The Bristol Street Subtrunk beginning at Sunflower Avenue and extending northerly on Bristol Street 1,000 feet. 3. The Sunflower Interceptor on Sunflower Avenue between Bear and Bristol Streets to intercept the Bear and Bristol Subtrunks and other main sewers in the area at manhole locations. Operational date would be March 1972. BOYLE ENGINEERING Bristol Street Subtrunk Sewer Report March 16, 1971 Page 3 Table I presents pertinent data for the Bear Street Subtrunk extension and the Bristol Street Sub trunk. TABLE I MASTER PLAN SUBTRUNK FACILITIES Limits Design Approx. Approx. Flow Length From To Size Slope (cfs) (feet) BEAR STREET SUBTRUNK Sunflower Avenue MacArthur Boulevard 12" 00034 101 1,320 BRISTOL STREET SUBTRUNK Sunflower Avenue 1,000' n/o Sunflower Avenue 12u .0022 0.8 1,080 Bristol Street Subtrunk Master Pl an Service Area Beginning at Sunflower Avenue and Bristol Street the service area extends easterly approximately 660 feet to the F02 Santa Ana Delhi Fie-:~ Control Channel 1 westerly approximately 1,000 feet and then northerly to the district boundary. (See Exhibit "A 11 .). The easterly boundary converges with Bristol Street iust north of MacArthur Boulevard due to the routing of the Santa Ana Delhi Channel. The channel acts as a barrier to those lands easterly of Bristol Street within the limits·of the half mile criteria and it was for this specific reason that the South Coast Plaza Subtrunk was extended to MacArthur Boulevard on the easterly side of the channel. Proposed Plaza Drive Sewer This facility v.uuld connect to the Bear Street Subtrunk at SunflowerAvenue, run easterly for approximately 730 feet along the north side of the street iust in BOYLE ENGINEERING Estimated Construction Cost $25,000 20,000 Bristol Street Subtrunk Sewer Report March 16, 1971 Page 4 back of the curb over to proposed Plaza Drive which is to be a dedicated street, then north on Plaza Drive approximately 2, 130 feet terminating at MacArthur Boulevard approximately 1,070 feet east of a prolongation of Bear Street. The sewer would vary in size from 15 inches down to 10 inches. It is proposed that the sewer would serve an area of approximately 110 acres north of Sunflower Avenue between Bear Street and Bristol Street extending to the district's northerly boundary of Al ton Avenue. The area encompasses approximately 63 acres of the original Bristol Street service area and approximately 47 acres of the original service area to the Bear Street Subtrunk. Excluded from this service area is the 16 acres on the northwest corner of Sunflower Avenue and Bristol Street. The proposed Plaza Drive Sewer has been correctly sized to handle the ultimate flows for its tributary areas. This sewer would relieve the Bear Street Subtrunk of about 47 acres of drainage area or 33 percent of its total 142 master-planned acreage and the Bristol Street Subtrunk of 63 acres of drainage area or 60 percent of its total 104 master-planned acreage. This has the effect of reducing the pipe one size in each case. Effect of M.oving Bristol Street Subtrunk to Proposed Plaza Drive Moving the Bristol Street Subtrunk westerly to Plaza Drive would deprive property on the east side of Bristol Street and the 16 acres on the northwest corner of Bristol Street and Sunflower Avenue from receiving district subtrunk service. Also, complications could arise in serving areas just westerly of Bristol Street and north to MacArthur Boulevard which are not owned by the South Coast Plaza Corporationo (See Exhibit 11 B11 .) The South Coast Plaza Corporation sewer BOYLE ENGINEERING Bristol Street Subtrunk Sewer Report March 16, 1971 Page 5 study has these properties draining to the proposed Plaza Drive Sewer. If any of these properties are split,and depending on the development pattern, they could also be deprived of having a subtrunk sewer in the drainage area. ~l-14-U Conrad Hohener / C. E. 10951 BOYLE ENGINEERING .. PROPOSED PLAZA DRIVE SEWER ~--PLAZA DRIVE SEWER DRAINAGE AREA ,.. . • l )ENLJ'.;l lAJ~-"- ,. -- r I J L-A~L \1 T \ I I I \ \ ,, ,, <' -...' ,~ 1\ \ \ F UTURE SUNFLOWER I NTERCEPTOR ---------- ------- -----~ BEAR STREET SUBTRUNK --. EXISTING TRUNK OR SUBTRUNK FUTURE INTERCEPTOR PROPOSED EXTENSION OR SU BTRUNK CITY LIMITS COUNTY SANITATI ON DIST. BOUNDARY I .. I u <1 z d .. t-z ~ r J ... ~ ~I[ 1 lf !i '&' ......... uJ --1 Cl • ~ ~ •" L <D-p:"" *!' (i -' I-J f'L/ ' L~ T .. , "'LQC ....... I l J J .... \. I .,1" S>,., ___..,.. ~> ..J 0 t- "' a:: "' COLU M BI NE A U R O RA PROP OS ED BRISTOL STREE SUBTRUNK SOUTH COAS T PLAZA SUBTRUNK . OR I \/[ S T ST S T __.,,,,,._ (~!-" ~~-Jl l~ - - - -.. (j) ;o z <I BEAR STREET SUBTRUNK~ EXTEN SION DRAINAGE AREA BRISTOL ST REET SUBTRUNK DRAINAGE AREA COUNTY SANITATION DISTRICT -t. ' 1 r·, r· -~/ ~ u ;; /p-~t~~.il~ ~ ,J -. f CD -----0 EXHIBIT 'A' ( MAIN ' POR. SE.r;. 25, 26, 8 :6, T. 5 S., R(' W. 1qo. 10 . ( /396 ~ 16i 19 16·18 is-20 j I I DETAIL ,,. ,·.zoo' ~rL ~ · MAIN Ji-ST: r: ~ . ,.."'... .. 0 ·.. ,,.. ~ •• t ti;'\ ·1 ... ~~..4'f ,, •• ~ --=====tJ-71- ..... {5 CQ ... ..., ~ ~ ~ .,, ,,._ "'"' MARCH 1962 MARCH 1968-69 DETAIL~· ,•.m- ® Ol.81~ ~ ® '.'i 10 AC, 410·07'. -/· • J VIRGINIE CALLENS 1402 S. BROADWAY SANTA ANA, CALIF. -~- 1" • 800' "' ~ .. @§ ® 16.17AC. ~ IZ.05 Ac: ,, $. ,. ,~ 410-08 4I0-09 /4.6!J AC. © II.RAC, 682l ,_,.. t--+-+-----1 05 ~~F=~===::::::=:~~~e~~· os . ., . IG AC BOUAJDARY NOTE -ASSESSOR'S BLOC/( 8 LOT NUMBERS . SHOWN IN CIRCLES ASSESSOR'S MAP BOOKl40 PAGEIS ~ ~OUNTY OF ORANGE ~· BELLE M. GRISET ET AL 923 W. 19th STREET SANTA ANA, CALIF. . :...,. .... ~·· ··-"""" ·•· -·-·-"'!""'_........, .... ~ ......... ~ ... ! ........ -~·--·~··· .............. ·~· .. '"' ......... ' ",, ...... ,.~,,; ••...... J,• ... ~ .... ' EXHIBIT I 8 1 .... .· • l;. . •. t l . ~ ( ro· '. 0 . . ( POR. N.1/2, sea 3411 35, rs s., R. 10 w. 07 ., . . tor 1 ® •1..11 A4 . , 'or 1. @ 10.UMI. • TRACT ,. ,. . . . ' ' ~ Mewna:!EI2.U':J=-=_,___ =-:. = = :::; = = = = = ~ .. I =. = ~ =-.---~~-.c::.:::;.c.-----f- .. .•. "• @ 11.71 ~II. ® II. U All. ., ' ... • :·. ·,, •' . ...... ~ I t • I ' • I ' '1 ' ' \! • • • . ; • ... · .. • ... '·' ! • . . . 'or J'. NO. 88 @ I , ....... it ••• ,., •. @ t ·~ ir.i. ~,. # ~ t .. ·• .. ',,, .. ; ' '' I'·.•:, •Ito.:··,.'" •.' •• 0 I,, I I ••' f • . '·. •• I .... ~. to ·,· / ! 1' It .• •,. ·! ... .. · .. ·.·:· ... · ... ··/'.:'··, .. 4'12·02 ,0,. I ';.' ... ( 140-06 "7384 •• . ... . .· •' . ' , •• ~Of!' • . : . . . . . ~· ·. . ( '.;' ' . .. . . ': : .. . ~ . . . . ~·. . . . '.· .. ··· IG ~C: J!??X/A/D'(RY.;-.. . .. . . , . . . \' . ·, .. ' . ' ... .' . -•• t . ,. • I ' e I '.' '•· I . . ' •. ··: ·~ ·. . . ~ . .. .. . . . . ; '... . . .. · t . .. , MARCH 1951 · /,/ARCH 1968-# j • TR. NO. 86 I BELLE M~ G1R,ISET ET AL; 923 W. 19th STREET " ~NTA ANA,· CALIF. ' Norr -A$$E$$0R'$ SLCC/t .• • : t . IJ LOT NUMBER$ SHOWN IN CIRCLES . VIRGINIE CALLENS 1402 S. BROADWAY SANTA . ANA·, .CA~IF. ' . . · A$SCSSOR 1$ MAI' ~ ··~ .: 1 IJOOKMO PAti£08 ~ . ., t:OUNTY 01' ORANfll . . : . .. . . .. . . . ' ... .. . . ... ....... -.-...... ..... ..._. .............. , ~ . ,.. -~ EXHIBIT .' 8 1 •• MILLER, N1ssoN E1 KocLER CLARK MILLER C. ARTHUR NISSON NELSON KOGLER H. LAWSON MEAD ATTORNEYS AT LAW 2014 NORTH BROADWAY SANTA ANA, CALIFORNIA 92706 LEGAL OPINION -COUNTY SANITATION DISTRICT NO. 7 RE: SUBTRUNK POLICY TELEPHONE 542-6771 The District adopted a Master Plan of Subtrunk Sewer Facilities described in an engineering report dated January, 1967 by Boyle & Low-ry. The report did not set forth any specific area limitations for subtrunk sewers. In studying the report, it can be established that the engineers were attempting to place sub- trunks so each property would not have to extend sewers for a distance in excess of 1/2 mile to reach said subtrunks. The .Master Plan has from time to time been added to in line with developments. Likewise, there is no reason not to allow modification of the Plan in line with development of the District so long as the general intent and purport of the Master Plan is to provide subtrunk sewers that will reasonably serve the requirements of the District. I am not aware of any precedent that would be established by the adoption of the Plaza Drive subtrunk sewer modification. Dated: March 16, 1971. ;'/ (°~~~-~ C. Arthur Nisson CAN:cp -,, #4 -submitted letter indicating that nothing legall y keeps us from makreng modification in subtrunk sewers adopted in 1 967 . Receive and file legal opinoin # 5 -Ho h ener reported on information contained in his report subbmitted this day to the boards . Receive and file report - proposed plan does sewer some of the propoe r ties shown on exhibits , but not all . Segerstrom says they do have master plan and are working with property owners .16 acres on northeast corner and griset proper ty could pose problems in the future depending on future developments. northeast corner and property on west side of Bristol could be taken ca.re of by City of Santa Ana.1 s sewer . Why couldn 1 t 1 6 acrea.s be tie,d into Plaza. Drive? Wolford -Plaza Drive sub :S runk can sevve a much larger area . Feels city will be much better off -northeast corner can be served by Southcoast Plaza subtrunk -That property can be,t served into Sunflower Interceptor . All proprty west of Bristol can into Plaza. Drive Avenue subtrunk . West side of Bristol into Plaza. Drive subtrunk . All developers either pay through a. frontage charge or build their own sewer . Suppose in April a new city council is appointed for City of Santa. Ana. -what is binding a bout this agreement? GC -See no problem on this . Smith -Explain #4 GC -Do not propose to build another subtrunk for that particular area. Wolford -See no problmrn as long as we can c ontribl subcontractors as we see fit . Report of staff -#5 Segerstrom -alignment of plaza. subtrunk , in their thinging, is more in conformance with District policy than Bristol Street . Ca.pa.city was designed in subrunk line in subtrunk to take in entirea:tn. run off of 100+ acres . If its permanent installation cost should be prorated among property owners along that area . If it i s designed that this line is temporary would change thewhole picture . If line must be 15 11 f~er line it is for all acreage and permanent. that means 15 acrea devielopment privides capacity ~X~ for 100 some feet for 150 acres . This is not equitable -Will it be pumped into Bear Street manhole or in Sunflower interceptor . Wolford -Districts staff feel s that with large trunk in Sunflower this would be logical ~~~~XX~ l i ne to use -SA concurs . PGB -staff considers this a temporary line and will evenuually hook into Sunflower Line Segerstrom -Plaza Drive to Bear Street Manhold -can they work out plans with city of Santa. Ana. only (as local sewer) Hungry Tiger would ~ be tying in with it . ~ PGB -If temporary line it could be sized for temporary flow but if Hungry Tiger tie into it then not temporary Segerstrom -could line be sized for interi m period Hohener -8 11 line until 1972 when Districts make 15 11 connection at Plaza Drive and 8 11 line,Z' becomes subtrunk on Plaza Drive Resolution -approve~ modification of Maste r Plan as proposed Segerstrom -what a.bout reimbursement agreement -how does this a.ff ect them 2130 ' -city wo~ reimburse Districts upon demand District will purchase line from Sege rstrom after they build it . Bear to Sunflower not included in contract Resolution = approve agreement with city of Santa. Ana. Resolution -Approve standard master plan reimbursement agreement area northerly of Sunflower and that developer will provide engineering and construction contingent upon agre emen¥rtm with the City of Santa Ana # 6 -PGB reported on acts staff have taken re lative to federal and state a ssistance on Sunflower Interceptor -defer until we hear more before we sell more b o nds -M/S