HomeMy WebLinkAbout09-25-2019 Board Meeting Complete Agenda Packet GoJN SANITgT,/0
Q ?
r c�
o i
H� THE ENS
Orange County Sanitation District
BOARD OF DIRECTORS
Regular Meeting Agenda
Wednesday, September 25, 2019 - 6:00 PM
Board Room
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
ACCOMMODATIONS FOR THE DISABLED: Meeting Rooms are wheelchair accessible. If you require any
special disability related accommodations, please contact the Orange County Sanitation District Clerk of the
Board's office at (714) 593-7433 at least 72 hours prior to the scheduled meeting. Requests must specify the
nature of the disability and the type of accommodation requested.
AGENDA POSTING: In accordance with the requirements of California Government Code Section 54954.2, this
agenda has been posted outside the main gate of the Sanitation District's Administration Building located at
10844 Ellis Avenue, Fountain Valley, California, and on the Sanitation District's website at www.ocsd.com not
less than 72 hours prior to the meeting date and time above. All public records relating to each agenda item,
including any public records distributed less than 72 hours prior to the meeting to all, or a majority of the
Board of Directors, are available for public inspection in the office of the Clerk of the Board.
AGENDA DESCRIPTION: The agenda provides a brief general description of each item of business to be
considered or discussed. The recommended action does not indicate what action will be taken. The Board of
Directors may take any action which is deemed appropriate.
MEETING AUDIO: An audio recording of this meeting is available within 24 hours after adjournment of the
meeting. Please contact the Clerk of the Board's office at(714) 593-7433 to request the audio file.
NOTICE TO DIRECTORS: To place items on the agenda for a Committee or Board Meeting, the item must be
submitted in writing to the Clerk of the Board: Kelly A. Lore, MMC, (714) 593-7433/ klore@ocsd.com at least 14
days before the meeting.
FOR ANY QUESTIONS ON THE AGENDA, BOARD MEMBERS MAY CONTACT STAFF AT:
General Manager: Jim Herberg,jherberg@ocsd.com/ (714)593-7300
Asst. General Manager: Lorenzo Tyner, Ityner@ocsd.com/(714)593-7550
Asst. General Manager: Rob Thompson, rthompson@ocsd.com/ (714)593-7310
Director of Human Resources: Celia Chandler, cchandler@ocsd.com/(714) 593-7202
Director of Engineering: Kathy Millea, kmillea@ocsd.com/(714)593-7365
Director of Environmental Services: Lan Wiborg, Iwiborg@ocsd.com/(714) 593-7450
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
CALL TO ORDER
(Board Chairman David Shawver)
INVOCATION AND PLEDGE OF ALLEGIANCE
(Jesus J. Silva, City of Fullerton)
ROLL CALL (Clerk of the Board)
DECLARATION OF QUORUM
PUBLIC COMMENTS:
If you wish to address the Board of Directors on any item, please complete a Speaker's Form (located at the table
outside of the Board Room) and submit it to the Clerk of the Board or notify the Clerk of the Board the item
number on which you wish to speak. Speakers will be recognized by the Chairperson and are requested to limit
comments to three minutes.
SPECIAL PRESENTATIONS:
Employee Service Awards
REPORTS:
The Board Chairperson and the General Manager may present verbal reports on miscellaneous matters of
general interest to the Directors. These reports are for information only and require no action by the Directors.
CONSENT CALENDAR:
Consent Calendar Items are considered to be routine and will be enacted, by the Board of Directors, after one
motion, without discussion. Any items withdrawn from the Consent Calendar for separate discussion will be
considered in the regular order of business.
1. APPROVAL OF MINUTES 2019-568
RECOMMENDATION:
Approve Minutes of the Regular Meeting of the Board of Directors held August 28,
2019.
Originator: Kelly Lore
Attachments: Agenda Report
08-28-2019 Board Meeting Minutes
Page 1 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
RECEIVE AND FILE:
2. COMMITTEE MEETING MINUTES 2019-569
RECOMMENDATION: Receive and file the following:
A. Minutes of the Legislative and Public Affairs Committee held July 8, 2019
B. Minutes of the Operations Committee Meeting held July 10, 2019
C. Minutes of the Administration Committee Meeting held July 17, 2019
D. Minutes of the Steering Committee Meeting held July 24, 2019
Originator: Kelly Lore
Attachments: Agenda Report
07-08-2019 Legislative Committee Minutes
07-10-2019 Operations Committee Minutes
07-17-2019 Administration Committee Minutes
07-24-2019 Steering Committee Minutes
3. REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH 2O19-577
OF AUGUST 2019
RECOMMENDATION: Receive and file the following:
Report of the Investment Transactions for the month of August 2019.
Originator: Lorenzo Tyner
Attachments: Agenda Report
Investment Transactions for the Month of August 2019
4. STATUS OF EARLY LEASE TERMINATION NEGOTIATIONS 2019-594
RECOMMENDATION: Receive and file the following:
Summary of Early Lease Termination Agreements.
Originator: Lorenzo Tyner
Attachments: Agenda Report
Summary of Early Lease Termination Agreements
OPERATIONS COMMITTEE:
5. RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT 2019-601
NO. 2, PROJECT NO. P2-123
RECOMMENDATION:
A. Approve a Professional Construction Services Agreement with Spec Services,
Page 2 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
Inc. to provide construction support services for Return Activated Sludge Piping
Replacement at Plant No. 2, Project No. P2-123, for a total amount not to
exceed $252,329; and
B. Approve a contingency of $25,233 (10%).
Originator: Kathy Millea
Attachments: Agenda Report
Professional Construction Services Agreement
09-04-19 Operations Committee Presentation
Legislative History
9/4/19 OPERATIONS COMMITTEE Recommended for Approval
6. RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT 2019-602
NO. 2, PROJECT NO. P2-123
RECOMMENDATION:
A. Receive and file Bid Tabulation and Recommendation for Return Activated
Sludge Piping Replacement at Plant No. 2, Project P2-123;
B. Receive and file Orange County Sanitation District's Notice of Intent to Award
dated August 8, 2019;
C. Receive and file Award Protest from W.M. Lyles Co. dated August 13, 2019,
concerning the award to Shimmick Construction Company;
D. Receive and file response letter from Shimmick Construction Company dated
August 20, 2019, regarding the bid protest of W.M. Lyles Co.;
E. Receive and file Orange County Sanitation District's determination letter dated
August 23, 2019, to W.M. Lyles Co. responding to Award Protest;
F. Deny award protest filed by W.M. Lyles Co.;
G. Award a Construction Contract to Shimmick Construction Company for Return
Activated Sludge Piping Replacement at Plant No. 2, Project No. P2-123, for a
total amount not to exceed $6,042,111; and
H. Approve a Construction Contract contingency of $604,211 (10%).
Originator: Kathy Millea
Page 3 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
Attachments: Agenda Report
W.M. Lyles Co. Award Protest Letter
Shimmick Construction Company Response to Bid Protest
Letter
Sanitation District Response to W.M. Lyles Co. Award Protest
Sanitation District Intent to Award Letter
Construction Contract
09-04-19 Operations Committee Presentation
Legislative History
9/4/19 OPERATIONS COMMITTEE Recommended for Approval
7. CAPITAL IMPROVEMENT PROGRAM CONTRACT PERFORMANCE 2019-603
REPORT
RECOMMENDATION:
Receive and file the Capital Improvement Program Contract Performance Report for
the period ending June 30, 2019.
Originator: Kathy Millea
Attachments: Agenda Report
OCSD CIP Quarterly Contracts Report August 2019
Legislative History
9/4/19 OPERATIONS COMMITTEE Recommended for Approval
8. SUNFLOWER AND RED HILL INTERCEPTOR REPAIR, PROJECT NO. 2019-605
7-66
RECOMMENDATION:
A. Approve a Professional Design Services Agreement with GHD Inc. to provide
engineering services for Sunflower and Red Hill Interceptor Repair, Project No.
7-66, for an amount not to exceed $308,712; and
B. Approve a contingency of $30,871 (10%).
Originator: Kathy Millea
Attachments: Agenda Report
7-66 Professional Design Services Agreement
Legislative History
9/4/19 OPERATIONS COMMITTEE Recommended for Approval
9. PLANT NO. 2 EFFLUENT PUMP STATION ANNEX, VARIABLE 2019-606
FREQUENCY DRIVE MODERNIZATION, AND MANUFACTURER
SERVICE AGREEMENT
Page 4 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
RECOMMENDATION:
A. Approve Sole Source Purchase Order to the Original Equipment Manufacturer,
Siemens Industry, Inc., to modernize three Effluent Pump Station Annex (EPSA)
Variable Frequency Drives (VFDs) for a fixed amount not to exceed $368,879,
plus applicable tax and shipping;
B. Approve Sole Source Purchase Order for SIEPRO® Technical Service
Agreement with Siemens Industry, Inc. to perform annual preventative
maintenance, for a three-year period, for an amount not to exceed $68,805, plus
applicable tax and shipping; and
C. Approve contingency funds of 20% for each contract, for a combined total not to
exceed $87,537.
Originator: Rob Thompson
Attachments: Agenda Report
Legislative History
9/4/19 OPERATIONS COMMITTEE Recommended for Approval
10. ON-CALL PREVENTATIVE MAINTENANCE SERVICES FOR 2019-609
ELECTRICAL EQUIPMENT (MP-278)
RECOMMENDATION:
A. Approve a Contract to provide on-call electrical maintenance services,
Specification No. S-2019-1006BD-R, with Hampton Tedder Technical Services
for a one-year period effective November 1, 2019 through October 31, 2020, for
an amount not to exceed $1,657,950, and approve four, one-year renewal
options; and
B. Approve a contingency of $82,898 (5%).
Originator: Rob Thompson
Attachments: Agenda Report
Specification No. S-2019-1006BD-R
Legislative History
9/4/19 OPERATIONS COMMITTEE Recommended for Approval
11. BLANKET PURCHASE ORDER FOR ARC FLASH SUIT & GLOVE 2019-610
RENTAL PROGRAM FROM CINTAS CORPORATION
RECOMMENDATION:
A. Approve Blanket Purchase Order with Cintas Corporation for 12 calorie per
Page 5 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
square centimeter rated daily wear uniform and 65 calorie per square centimeter
rated Arc Flash Suit and Electrically Insulated Glove Lease Program per
Cooperative Agreement Contract: R-BB-19002, for a total amount not to exceed
$380,185 for a three-year contract term, plus one additional three-year renewal
option; and
B. Approve contingency of $19,000 (5%).
Originator: Rob Thompson
Attachments: Agenda Report
Legislative History
9/4/19 OPERATIONS COMMITTEE Recommended for Approval
ADMINISTRATION COMMITTEE:
12. 2019 ORANGE COUNTY REGIONAL WATER AND WASTEWATER 2019-613
HAZARD MITIGATION PLAN
RECOMMENDATION:
Adopt Resolution No. OCSD 19-17 entitled, "A Resolution of the Board of Directors of
the Orange County Sanitation District Approving and Adopting the 2019 Orange County
Regional Water and Wastewater Hazard Mitigation Plan," in accordance with the
Disaster Mitigation Act (DMA) of 2000.
Originator: Celia Chandler
Attachments: Agenda Report
Annex C of the 2019 Orange County Regional Water and
Wastewater Hazard Mitigation Plan
Resolution No. OCSD 19-17
Resolution Exhibit "A" 2019 Orange County Regional Water
and Wastewater Hazard Mitigation Plan
09-11-19 Administration Committee Presentation
Legislative History
9/11/19 ADMINISTRATION Recommended for Approval
COMMITTEE
13. REIMBURSEMENTS TO BOARD MEMBERS AND STAFF 2019-611
RECOMMENDATION:
Receive and file report of reimbursements to Board Members and Staff per
Government Code Section 53065.5 for the period July 1, 2018 through June 30, 2019.
Originator: Lorenzo Tyner
Page 6 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
Attachments: Agenda Report
Report of Reimbursements for 7-1-18 through 6-30-19
Legislative History
9/11/19 ADMINISTRATION Recommended for Approval
COMMITTEE
LEGISLATIVE AND PUBLIC AFFAIRS COMMITTEE:
14. PUBLIC AFFAIRS UPDATE FOR THE MONTHS OF JULY AND 2019-604
AUGUST 2019
RECOMMENDATION:
Receive and file the Public Affairs Update for the months of July and August 2019.
Originator: Jim Herberg
Attachments: Agenda Report
Outreach Report July-August 2019
Media Clips July-August 2019
09-09-19 LaPA Committee Presentation
Legislative History
9/9/19 LEGISLATIVE AND PUBLIC Recommended for Approval
AFFAIRS COMMITTEE
15. LEGISLATIVE AFFAIRS UPDATE FOR THE MONTHS OF JULY AND 2019-608
AUGUST 2019
RECOMMENDATION:
Receive and file the Legislative Affairs Update for the months of July and August 2019.
Originator: Jim Herberg
Attachments: Agenda Report
Federal Update - ENS Resources
Federal Legislative Matrix - ENS Resources
State Update - Townsend Public Affairs
Legislative Matrix - Townsend Public Affairs
Grant Matrix
09-09-19 LaPA Committee Presentations
Legislative History
9/9/19 LEGISLATIVE AND PUBLIC Recommended for Approval
AFFAIRS COMMITTEE
Page 7 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
STEERING COMMITTEE:
16. GENERAL MANAGER'S FISCAL YEAR 2019-2020 WORK PLAN 2019-600
RECOMMENDATION:
Receive and file the General Manager's Fiscal Year 2019-2020 Work Plan.
Originator: Jim Herberg
Attachments: Agenda Report
General Manager's Fiscal Year 2019-2020 Work Plan
17. GENERAL MANAGER'S COMPENSATION AND BENEFITS 2019-612
RECOMMENDATION:
Adopt Resolution No. OCSD 19-12 entitled, "A Resolution of the Board of Directors of
the Orange County Sanitation District approving salary increases and salary range
adjustments for the General Manager for Fiscal Year 2019/2020, Fiscal Year
2020/2021, and Fiscal Year 2021/2022", authorizing the Board Chair to implement
increases consisting of a 3% salary range adjustment and corresponding salary
increase annually and up to a 2.5% merit increase annually based on job performance
as determined by the Board of Directors commencing in the first pay period of July
2019 for Fiscal Year 2019/2020.
Attachments: Agenda Report
Resolution No. OCSD 19-12
General Manager's Current and Proposed Salary Schedule
General Manager's At-Will Employment Agreement
18. EXECUTIVE MANAGEMENT TEAM COMPENSATION AND BENEFITS 2019-614
AND MANAGER GROUP COMPENSATION AND BENEFITS
RECOMMENDATION:
A. Adopt Resolution No. OCSD 19-13 entitled, "A Resolution of the Board of
Directors of the Orange County Sanitation District approving salary increases,
salary range adjustments, and a minor increase to 457(b) matching contributions
for At-Will Executive Management Team employees for Fiscal Year 2019/2020,
Fiscal Year 2020/2021 , and Fiscal Year 2021/2022", authorizing the General
Manager to implement increases consisting of a 3% salary range adjustment
annually and corresponding salary increases and up to a 5% merit increase
annually based on job performance as determined by the General Manager, not
to exceed Step 5 of the corresponding salary range, commencing in the first pay
period of July 2019 for Fiscal Year 2019/2020.
B. Adopt Resolution No. OCSD 19-14 entitled, "A Resolution of the Board of
Directors of the Orange County Sanitation District approving salary increases,
Page 8 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
salary range adjustments, and a minor increase to 457(b) matching contributions
for unrepresented management employees for Fiscal Year 2019/2020, Fiscal
Year 2020/2021 , and Fiscal Year 2021/2022", authorizing the General Manager
to implement increases consisting of a 3% salary range adjustment annually and
corresponding salary increases and up to a 5% merit increase annually based
on job performance as determined by the General Manager, not to exceed Step
5 of the corresponding salary range, commencing in the first pay period of July
2019 for Fiscal Year 2019/2020.
Originator: Celia Chandler
Attachments: Agenda Report
Resolution No. OCSD 19-13 - Executive Management Team
Current Executive Management Team Pay Table
Proposed Executive Management Team Pay Tables, July
2019 to June 2022
Resolution No. OCSD 19-14 - Manager Group
Current Manager Group Pay Table
Proposed Manager Group Pay Tables, July 2019 to July 2022
19. CONFIDENTIAL EMPLOYEE GROUP COMPENSATION BENEFITS 2019-615
RECOMMENDATION:
A. Adopt Resolution No. OCSD 19-15 entitled, "A Resolution of the Board of
Directors of the Orange County Sanitation District approving salary range
adjustments and consideration to establish a Health Retirement Account for
unrepresented exempt confidential employees for Fiscal Year 2019/2020, Fiscal
Year 2020/2021 , and Fiscal Year 2021/2022".
B. Adopt Resolution No. OCSD 19-16 entitled, "A Resolution of the Board of
Directors of the Orange County Sanitation District approving salary range
adjustments, a minor increase in Development Pay, and consideration to
establish a Health Retirement Account for unrepresented non-exempt
confidential employees for Fiscal Year 2019/2020, Fiscal Year 2020/2021, and
Fiscal Year 2021/2022".
Originator: Celia Chandler
Attachments: Agenda Report
Resolution No. OCSD 19-15 - Exempt Confidential
Resolution No. OCSD 19-16 - Non-Exempt Confidential
Current Salary Schedule for Confidential Group (FY
2018/2019)
Proposed Salary Schedules for Confidential Group
Page 9 of 10
BOARD OF DIRECTORS Regular Meeting Agenda Wednesday, September 25, 2019
NON-CONSENT:
20. STRATEGIC PLAN DEVELOPMENT 2019-590
RECOMMENDATION:
Provide input to staff on the development of the Strategic Plan.
Originator: Rob Thompson
Attachments: Agenda Report
OCSD Resilient Staffing Policy Statement
OCSD Safety and Physical Security Policy Statement
OCSD Cyber Security Policy Statement
OCSD Property Management Policy Statement
INFORMATION ITEMS:
AB 1234 DISCLOSURE REPORTS:
This item allows Board members to provide a brief oral report regarding the disclosure of outside committees,
conferences, training, seminars, etc. attended at the Agency's expense, per Government Code§53232.3(d).
CLOSED SESSION:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
At this time Board members may request staff to place an item on a future agenda.
ADJOURNMENT:
Adjourn the Board meeting until the Regular Meeting of the Board of Directors on
October 23, 2019 at 6:00 p.m.
Page 10 of 10
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
BOARD OF DIRECTORS (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-568 Agenda Date: 9/25/2019 Agenda Item No: 1.
FROM: James D. Herberg, General Manager
Originator: Kelly A. Lore, Clerk of the Board
SUBJECT:
APPROVAL OF MINUTES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Approve Minutes of the Regular Meeting of the Board of Directors held August 28, 2019.
BACKGROUND
In accordance with the Board of Directors Rules of Procedure, an accurate record of each meeting
will be provided to the Directors for subsequent approval at the following meeting.
RELEVANT STANDARDS
• Resolution No. OCSD 18-12
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Minutes of the Board of Directors meeting held August 28, 2019
Orange County Sanitation District Page 1 of 1 Printed on 9/18/2019
powered by LegistarTM
ORANGE COUNTY SANITATION DISTRICT
MINUTES
BOARD OF DIRECTORS
AUGUST 28, 2019
Go�NI N S A N I Tq T�o2
Q
c
o -i
THE
Board Room
Administration Building
10844 Ellis Avenue
Fountain Valley, CA 92708
(714) 593-7433
BOARD OF DIRECTORS Minutes August 28, 2019
CALL TO ORDER
A regular meeting of the Board of Directors of the Orange County Sanitation District was
called to order by Board Chairman David Shawver on August 28, 2019 at 6:02 p.m. in the
Administration Building. Alternate Director Stacy Berry delivered the invocation and led the
Pledge of Allegiance.
ROLL CALL AND DECLARATION OF QUORUM
The Clerk of the Board declared a quorum present as follows:
Present: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Absent: Peter Kim and Mark Murphy
STAFF MEMBERS PRESENT: Jim Herberg, General Manager; Rob Thompson, Assistant
General Manager; Lorenzo Tyner, Assistant General Manager; Celia Chandler, Director of
Human Resources; Kathy Millea, Director of Engineering; Lan Wiborg, Director of
Environmental Services; Kelly Lore, Clerk of the Board; Jeff Armstrong; Marc Brown; Jennifer
Cabral; Cliff Casanova; Rod Collins; Phil Cordova; Ron Coss; Raul Cuellar; Don Cutler; Thys
DeVries; Mike Dorman; Dean Fisher; Al Garcia; Ted Gerber; Jed Gonzales; Mark Kawamoto;
Laurie Klinger; Tina Knapp; Laura Maravilla; Tom Meregillano; Andrew Nau; Wally Ritchie;
Roya Sohanaki; Don Stokes; Thomas Vu; and Eros Yong.
OTHERS PRESENT: Brad Hogin (General Counsel); Laura Kalty, Liebert Cassidy Whitmore
(Special Counsel); Bob Ooten (Alternate Director) CMSD; Saliem Aregaye, OCEA; Joseph
Choo, GST and Austin Mejia, Supervisor Chaffee's office.
PUBLIC COMMENTS:
None.
SPECIAL PRESENTATIONS:
Assistant General Manager Rob Thompson presented a 30 year Employee Service Award to
Phil Cordova, Lead Mechanic Division 870.
REPORTS:
Page 1 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
Chair Shawver thanked everyone who was able to attend OCSD's 65th Open House and
Centrifuge Facility Ribbon Cutting ceremony last month, and stated that more than 45 elected
officials, industry leaders attended the ribbon cutting ceremony with over 500 guests at the
Community Open House.
Chair Shawver also reported on his attendance and participation at the CASA Conference in
San Diego last week and the Urban Water Institute Conference in San Diego the week of the
19th. He stated that information regarding the Governor's Plan for California WateReuse had
been provided to the Directors and made available for the public.
Chair Shawver thanked everyone who was able to attend OCSD's 65th Open House and
Centrifuge Facility Ribbon Cutting ceremony last month, and stated that more than 45 elected
officials, industry leaders attended the ribbon cutting ceremony with over 500 guests at the
Community Open House.
Chair Shawver also reported on his attendance and participation at the CASA Conference in
San Diego last week and the Urban Water Institute Conference in San Diego the week of the
19th. He stated that information regarding the Governor's Plan for California WateReuse had
been provided to the Directors and made available for the public.
General Manager Herberg reported that the American Society of Civil Engineers conducted a
peer review conducted by several outside agencies who identified strengths and specific
opportunities for improvement He stated that Director of Engineering Kathy Millea will work
with staff to follow-up on these opportunities.
Mr. Herberg announced that OCSD's Purchasing, Contracts & Materials Management
Division has been awarded the Achievement of Excellence in Procurement for the 18th
consecutive year. He also announced and congratulated Jennifer Cabral on her promotion to
Administration Manager who will help to support the Executive Management Team and the
Board of Directors, while overseeing Public Affairs and Board Services.
Mr. Herberg stated that tonight will be the first of three presentations for the Development of
the New Strategic Plan, including a Special meeting of the Board on September 18; and
concluding at the Regular Board meeting on September 25.
Finally, Mr. Herberg announced that the new agenda management software, the Legistar
product from Granicus has been launched.
CONSENT CALENDAR:
1. APPROVAL OF MINUTES 2019-447
Originator: Kelly Lore
MOVED, SECONDED, AND DULY CARRIED TO:
Approve Minutes of the Regular Meeting of the Board of Directors held July 24, 2019.
Page 2 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
2. ANNUAL MANHOLE FRAME AND COVER REPAIR CONTRACT 2019-481
Originator: Rob Thompson
MOVED, SECONDED, AND DULY CARRIED TO:
A. Receive and file Bid Tabulation and Recommendation for Ayala Engineering for
Manhole Frame Cover Replacement Services, Specification No.
S-2019-1055BD.
B. Award a Service Contract to Ayala Engineering to provided Manhole Frame &
Cover Replacement Services, Specification No. S-2019-1055BD, for a total
amount not to exceed $390,220 for the period beginning November 1, 2019
through October 31, 2020, with four optional one-year renewals; and
C. Approve an annual contingency of $58,533 (15%).
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
3. GENERAL MANAGER APPROVED PURCHASES AND ADDITIONS TO 2019-483
THE PRE-APPROVED OEM SOLE SOURCE LIST
Originator: Lorenzo Tyner
MOVED, SECONDED, AND DULY CARRIED TO:
Page 3 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
A. Receive and file District purchases made under the General Manager's authority
for the period of April 1, 2019 to June 30, 2019; and
B. Approve the following additions to the pre-approved OEM Sole Source List for
the period of April 1, 2019 to June 30, 2019:
1. DME - Exhaust Bellows
2. FAIRBANKS NIJHUIS (FAIRBANKS MORSE) - Pump Repairs
3. JOHNSON MATTHEY SEC - Oxidation Catalyst (OXI) Units
4. SOUTHERN CALIFORNIA COASTAL WATER RESEARCH PROJECT
(SCCWRP)-Bight'18 Biological Impacts Assessment
5. WONDERWARE CALIFORNIA - Industrial Operator Interface Products
(IntelaTrac)
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
RECEIVE AND FILE:
4. COMMITTEE MEETING MINUTES 2019-449
Originator: Kelly Lore
ACTION TAKEN TO:
Receive and file the approved minutes of the following committees:
Steering Committee Meeting held June 26, 2019
5. REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH 2O19-448
OF JULY 2019
Originator: Lorenzo Tyner
ACTION TAKEN TO:
Receive and file the report of the Investment Transactions for the month of July 2019.
Page 4 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
PUBLIC HEARING:
6. COLLECTION OF SEWER SERVICE CHARGES VIA THE TAX ROLL 2019-486
Originator: Lorenzo Tyner
Board Chairman David Shawver read the title into the record and proceeded with the
Public Hearing.
MOVED, SECONDED, AND DULY CARRIED TO:
A. Conduct a public hearing to receive input on a report filed with the Clerk of the
Board entitled: "Sewer Service Charges for Collection on Tax Rolls for Fiscal
Year 2019-20"
1. Open the Public Hearing
2. Receive staff report and recommendations
3. Report of written communications by Clerk of the Board
4. Public Comment
5. Close Public Hearing
6. Discussion by Board of Directors;
B. Unless there is a majority protest, adopt the report, which has the assessor's
parcel numbers and amount of charges for collection on the tax rolls;
C. Adopt Resolution No. OCSD 19-11 entitled "A Resolution of the Board of
Directors of the Orange County Sanitation District adopting the Report proposing
to collect Sewer Service Fees on the Tax Roll for Fiscal Year 2019/2012";
D. Authorize execution of the "Certification of Assessment";
E. Direct staff to file a certified copy of the adopted Resolution, Report and the
Certification of assessment with the County Auditor-Controller; and
F. Direct staff to coordinate collection of sanitary sewer service charges on the
general Orange County tax rolls with the County Auditor-Controller, Assessor,
and Tax Collector.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
Page 5 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
STEERING COMMITTEE:
7. AMENDMENT TO BIG CANYON COUNTRY CLUB EASEMENT 2019-496
Originator: Lorenzo Tyner
MOVED, SECONDED, AND DULY CARRIED TO:
Approve the Amendment to Easement between Orange County Sanitation District and
Big Canyon Country Club to adjust the Sanitation District's easement to correspond
with the new sewer location within the Big Canyon Country Club in the City of Newport
Beach.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
8. SETTLEMENT AGREEMENT WITH ASEPTIC TECHNOLOGY, LLC 2019-497
Originator: Lan Wiborg
MOVED, SECONDED, AND DULY CARRIED TO:
Authorize the General Manager to execute a Settlement Agreement to settle industrial
wastewater discharge enforcement matters with Aseptic Technology, LLC, a facility that
discharged without a valid Orange County Sanitation District permit, for $185,000 plus
applicable fees and interest, in a form approved by General Counsel.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
9. GENERAL MANAGER'S FISCAL YEAR 2019-20 DRAFT WORK PLAN 2019-498
Originator: Jim Herberg
Page 6 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the General Manager's Fiscal Year 2019-2020 Draft Work Plan.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
10. ELIMINATION OF UNFUNDED ACTUARIAL ACCRUED LIABILITY 2019-526
(UAAL) AND NET PENSION LIABILITY (NPL) WITHIN THE ORANGE
COUNTY EMPLOYEES' RETIREMENT SYSTEM
Originator: Lorenzo Tyner
MOVED, SECONDED, AND DULY CARRIED TO:
Direct staff to pay off the following amounts in the Orange County Sanitation District's
defined pension plan administered by the Orange County Employees' Retirement
System (OCERS) in an amount not to exceed $38 million:
• Unfunded Actuarial Accrued Liability (UAAL) in the amount of $9 million for
pension benefits
• Net Pension Liability (NPL) in the amount of $29 million for deferred investment
loss
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
NON-CONSENT:
11. TREASURER'S REPORT FOR THE FOURTH QUARTER ENDED 2019-488
J U N E 30, 2019
Originator: Lorenzo Tyner
Page 7 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
MOVED, SECONDED, AND DULY CARRIED TO:
Receive and file the Orange County Sanitation District Fourth Quarter Treasurer's
Report for the period ended June 30, 2019.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Cecilia Iglesias, Lucille Kring, Sandra
Massa-Lavitt, Richard Murphy, Steve Nagel, Andrew Nguyen, Glenn
Parker, Erik Peterson, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate),
Stacy Berry (Alternate) and Jan Flory (Alternate)
Noes: None
Absent: Peter Kim and Mark Murphy
Abstentions: None
12. SUCCESSOR MEMORANDUMS OF UNDERSTANDING FOR THE 2019-499
SUPERVISOR & PROFESSIONAL GROUPS
Originator: Celia Chandler
MOVED, SECONDED, AND DULY CARRIED TO:
A. Adopt Resolution No. OCSD 19-08, entitled, "A Resolution of the Board of
Directors of the Orange County Sanitation District approving the Memoranda of
Understanding between the Orange County Sanitation District and the
Supervisory and Professional Management Group, for Fiscal Years 2019/2020,
2020/2021 & 2021/2022; and
B. Direct staff to finalize and sign the Memoranda of Understanding (MOUs)
between Orange County Sanitation District and the two (2) Supervisory and
Professional Management Group bargaining units.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Lucille Kring, Sandra Massa-Lavitt, Andrew
Nguyen, Glenn Parker, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate) and
Jan Flory (Alternate)
Noes: Cecilia Iglesias, Richard Murphy, Steve Nagel, Erik Peterson and
Stacy Berry (Alternate)
Absent: Peter Kim and Mark Murphy
Abstentions: None
13. SUCCESSOR MEMORANDUMS OF UNDERSTANDING FOR THE 2019-500
ORANGE COUNTY EMPLOYEES ASSOCIATION
Originator: Celia Chandler
MOVED, SECONDED, AND DULY CARRIED TO:
Page 8 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
A. Adopt Resolution No. OCSD 19-09, entitled, "A Resolution of the Board of
Directors of the Orange County Sanitation District approving the Memoranda of
Understanding between the Orange County Sanitation District and the Orange
County Employees Association (OCEA), for Fiscal Years 2019/2020, 2020/2021
& 2021/2022; and
B. Direct staff to finalize and sign the Memoranda of Understanding (MOUs)
between Orange County Sanitation District and the three (3) OCEA bargaining
units.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Lucille Kring, Sandra Massa-Lavitt, Andrew
Nguyen, Glenn Parker, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate) and
Jan Flory (Alternate)
Noes: Cecilia Iglesias, Richard Murphy, Steve Nagel, Erik Peterson and
Stacy Berry (Alternate)
Absent: Peter Kim and Mark Murphy
Abstentions: None
14. SUCCESSOR MEMORANDUMS OF UNDERSTANDING FOR THE 2019-501
INTERNATIONAL UNION OF OPERATING ENGINEERS - LOCAL 501
Originator: Celia Chandler
MOVED, SECONDED, AND DULY CARRIED TO:
A. Adopt Resolution No. OCSD 19-10, entitled, "A Resolution of the Board of
Directors of the Orange County Sanitation District approving the Memoranda of
Understanding between the Orange County Sanitation District and the
International Union of Operating Engineers, Local 501, for Fiscal Years
2019/2020, 2020/2021 & 2021/2022; and
B. Direct staff to finalize and sign the Memoranda of Understanding (MOUs)
between Orange County Sanitation District and the Local 501 bargaining unit.
Ayes: Brad Avery, Allan Bernstein, Doug Chaffee, Robert Collacott, James
Ferryman, Phil Hawkins, Lucille Kring, Sandra Massa-Lavitt, Andrew
Nguyen, Glenn Parker, Tim Shaw, David Shawver, Christina Shea,
Fred Smith, Chad Wanke, John Withers, John O'Neill (Alternate) and
Jan Flory (Alternate)
Noes: Cecilia Iglesias, Richard Murphy, Steve Nagel, Erik Peterson and
Stacy Berry (Alternate)
Absent: Peter Kim and Mark Murphy
Abstentions: None
Page 9 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
Board Chairman Shawver announced that Closed Session would be heard prior to Item No.
15 Strategic Plan Development.
CLOSED SESSION:
CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE SECTIONS
54956.9(d) AND 54957.6
The Board convened in closed session at 6:49 p.m. to hear four items. Confidential minutes
of the Closed Session have been prepared in accordance with the above Government Code
Sections and are maintained by the Clerk of the Board in the Official Book of Confidential
Minutes of Board and Committee Closed Session Meetings.
CS-1 CONFERENCE WITH LABOR NEGOTIATORS - GOVERNMENT 2019-450
CODE SECTION 54957.6
CONVENED IN CLOSED SESSION:
Agency Designated Representatives: General Manager James Herberg, Assistant
General Manager Lorenzo Tyner, and Director of Human Resources Celia Chandler.
Unrepresented Employees: Confidential Group: Assistant Clerk of the Board; Clerk of
the Board; Human Resources Analyst; Human Resources Assistant; Human Resources
Supervisor; Principal HR Analyst; Secretary to the General Manager; and Senior
Human Resources Analyst.
CS-2 CONFERENCE WITH LABOR NEGOTIATORS - GOVERNMENT 2019-451
CODE SECTION 54957.6
CONVENED IN CLOSED SESSION:
Agency Designated Representatives: General Manager James Herberg, Assistant
General Manager Lorenzo Tyner and Director of Human Resources Celia Chander.
Unrepresented Employees: Managers Group: Administration Manager; Controller;
Engineering Manager; Environmental Laboratory & Ocean Monitoring Manager; Human
Resources & Risk Manager; IT Systems & Operations Manager; Maintenance
Manager; Operations Manager; and Purchasing and Contracts Manager.
CS-3 CONFERENCE WITH LABOR NEGOTIATORS - GOVERNMENT 2019-452
CODE SECTION 54957.6
CONVENED IN CLOSED SESSION:
Page 10 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
Agency Designated Representatives: General Manager James Herberg, Assistant
General Manager Lorenzo Tyner, and Director of Human Resources Celia Chandler.
Unrepresented Employees: Executive Managers Group: Assistant General Manager;
Director of Engineering; Director of Environmental Services; and Director of Human
Resources.
CS-4 CONFERENCE WITH LEGAL COUNSEL RE ANTICIPATED 2019-453
LITIGATION - GOVERNMENT CODE SECTION 54956.9(D)(2)
CONVENED IN CLOSED SESSION:
Number of Potential Cases: 1
Significant exposure to litigation: Claim of Jose Cruz
RECONVENED IN REGULAR SESSION.
The Board reconvened in regular session at 7:20 p.m.
CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED
SESSION:
General Counsel Brad Hogin reported that the Board unanimously denied the Claim of Jose
Cruz.
AB 1234 DISCLOSURE REPORTS:
Director Ferryman reported on his attendance at recent meetings of the NWRI and OCCOG.
15. STRATEGIC PLAN DEVELOPMENT 2019-492
Originator: Rob Thompson
Staff provided input on five intiatives for the development of the new Strategic Plan and
the Board was asked to:
Provide input to staff on the development of the Strategic Plan.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS, IF
ANY:
None.
Page 11 of 12
BOARD OF DIRECTORS Minutes August 28, 2019
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
At 8:21 p.m. Board Chairman Shawver adjourned the Board meeting until the SPECIAL
Meeting of the Board of Directors on September 18, 2019 at 5:00 p.m.
Submitted by:
Kelly A. Lore, MMC
Clerk of the Board
Page 12 of 12
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
BOARD OF DIRECTORS (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-569 Agenda Date: 9/25/2019 Agenda Item No: 2.
FROM: James D. Herberg, General Manager
Originator: Kelly A. Lore, Clerk of the Board
SUBJECT:
COMMITTEE MEETING MINUTES
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Receive and file the following:
A. Minutes of the Legislative and Public Affairs Committee held July 8, 2019
B. Minutes of the Operations Committee Meeting held July 10, 2019
C. Minutes of the Administration Committee Meeting held July 17, 2019
D. Minutes of the Steering Committee Meeting held July 24, 2019
BACKGROUND
In accordance with the Board of Directors Rules of Procedure, an accurate record of each meeting
will be provided to the Directors for subsequent approval at the following meeting
RELEVANT STANDARDS
• Resolution No. OCSD 18-12
ADDITIONAL INFORMATION
The minutes of the Committee meeting are approved at their respective Committees and brought
forth to the Board of Directors for receive and file only.
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Minutes of the Monthly Committee Meetings
Orange County Sanitation District Page 1 of 1 Printed on 9/19/2019
powered by LegistarTM
MINUTES OF THE
LEGISLATIVE AND PUBLIC AFFAIRS COMMITTEE
Orange County Sanitation District
Monday, July 8, 2019 at 3:30 p.m.
A meeting of the Legislative and Public Affairs Committee was called to order by
Committee Chair Peter Kim on Monday, July 8, 2019 at 3:31 p.m. in the Administration
Building of the Orange County Sanitation District. Chair Kim led the pledge of
allegiance. A quorum was declared present, as follows:
COMMITTEE MEMBERS PRESENT: STAFF PRESENT:
Peter Kim, Chair Jim Herberg, General Manager
Allan Bernstein, Vice-Chair Robert Thompson, Assistant General Manager
Lucille Kring, Member-At-Large Lorenzo Tyner, Assistant General Manager
Erik Peterson, Member-At-Large Celia Chandler, Director of Human Resources
Christina Shea, Member-At-Large Kathy Millea, Director of Engineering
David Shawver, Board Chair Lan Wiborg, Director of Environmental Services
John Withers, Board Vice-Chair Kelly Lore, Clerk of the Board
Tanya Chong
COMMITTEE MEMBERS ABSENT: Daisy Covarrubias
Lisa Frigo
Rebecca Long
Joshua Martinez
Kelly Newell
OTHERS PRESENT:
Brad Hogin, General Counsel
David French, ENS Resources (via
teleconference)
Eric O'Donnell, Townsend Public Affairs (TPA)
Cori Williams, Townsend Public Affairs (TPA)
PUBLIC COMMENTS:
None.
REPORT OF COMMITTEE CHAIR:
Chair Kim thanked ENS Resources and OCSD staff for organizing the recent trip to
Washington DC.
REPORT OF GENERAL MANAGER:
None.
07/08/2019 Legislative and Public Affairs Committee Minutes Page 1 of 3
CONSENT CALENDAR:
1. APPROVAL OF MINUTES (Clerk of the Board)
MOVED, SECONDED, and DULY CARRIED TO: Approve minutes for the
Committee meeting held on June 10, 2019.
Bernstein, Kim, Kring, Peterson, Shawver, Shea, and
AYES: Withers
NOES: None
ABSTENTIONS: None
ABSENT: None
NON-CONSENT:
2. LEGISLATIVE AFFAIRS UPDATE FOR THE MONTH OF JUNE 2019
(Jim Herberg)
David French, ENS Resources, provided a PowerPoint presentation and a brief
overview of the federal monthly report which included: infrastructure House
reauthorization, permit term legislation H.R. 1764, and PFAS/PFOA National
Defense Authorization Act update.
In response to a question from Board Chairman Shawver, Mr. French responded
that many environmental groups are the reason for opposition to HR. 1764 in
regard to the 10-year permit term. Mr. Herberg also mentioned that OCSD met
with the EPA during the recent DC visit and has submitted a letter to the EPA with
comments and observations on the EPA's "Discussion Framework for
Development of Draft Water Reuse Action Plan."
Eric O'Donnell, TPA, provided a PowerPoint presentation that included:
information on the current legislative schedule and deadlines; FY 2019-2020
budget; water tax update; safe drinking water proposal; SB 200 (Monning) —
drinking water; cap and trade expenditure plan; and 2019 legislation. In response
to a question from Director Kring, Mr. O'Donnell also briefly discussed the lack of
legislation regarding water storage.
Committee Chair Kim deemed the Legislative Affairs Update for the month of
June 2019 received and filed.
3. PUBLIC AFFAIRS UPDATE FOR THE MONTH OF JUNE 2019
(Jim Herberg)
Rebecca Long, Senior Public Affairs Specialist, reminded the Committee of the
upcoming Centrifuge Ribbon Cutting VIP event and the Open House on July 27
and announced a save the date for the State of the District on October 25. Ms.
Long then provided a brief update on the application for the WIIN grant and
reviewed outreach efforts made and meetings attended over the last month.
07/08/2019 Legislative and Public Affairs Committee Minutes Page 2 of 3
Director Kring thanked OCSD staff for their outreach efforts at the City of
Anaheim's recent OC Green Expo.
Committee Chair Kim deemed the Public Affairs Update for the month of
June 2019 received and filed.
INFORMATION ITEMS:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
Committee Chair Kim declared the meeting adjourned at 3.57 p.m. to the next Legislative
and Public Affairs Committee meeting, Monday, September 9, 2019 at 12.00 p.m.
Submitted by-.
r Kelly A. Lore, MMC
Clerk of the Board
07/08/2019 Legislative and Public Affairs Committee Minutes Page 3 of 3
MINUTES OF THE
SPECIAL OPERATIONS COMMITTEE MEETING
Orange County Sanitation District
Wednesday, July 10, 2019, 5:00 p.m.
A Special meeting of the Operations Committee was called to order by Committee Chair
Bob Collacott on Wednesday, July 10, 2019 at 5:01 p.m. in the Administration Building.
Director Jesus Silva led the Flag Salute. A quorum was declared present, as follows:
COMMITTEE MEMBERS PRESENT: STAFF PRESENT:
Robert Collacott, Chair Jim Herberg, General Manager
Mariellen Yarc, Vice-Chair Rob Thompson, Assistant General Manager
Brad Avery Lorenzo Tyner, Assistant General Manager
Allan Bernstein Celia Chandler, Director of Human Resources
Doug Chaffee Kathy Millea, Director of Engineering
Phil Hawkins Lan Wiborg, Director of Environmental Services
Steve Jones Kelly Lore, Clerk of the Board
Lucille Kring Megan Carlson
Sandra Massa-Lavitt Ron Coss
Tim Shaw Jacob Dalgoff
Jesus J. Silva Mike Dorman
Fred Smith Dean Fisher
David Shawver, Board Chair Lisa Frigo
John Withers, Board Vice-Chair Ted Gerber
Mark Kawamoto
COMMITTEE MEMBERS ABSENT: Annie Larkin
None Cory Mayne
Tom Meregillano
Jeff Mohr
Adam Nazaroff
Valerie Ratto
Don Stokes
Eros Yong
OTHERS PRESENT:
Brad Hogin, General Counsel
Austin Mejia (Supervisor Chaffee's office)
PUBLIC COMMENTS:
None.
Clerk of the Board Kelly Lore announced that late communication was received regarding
Item No. 4 and Item No. 5 which was provided in hard copy to the Directors and made
available to the public.
07/10/2019 Operations Committee SPECIAL MEETING Minutes Page 1 of 7
REPORT OF GENERAL MANAGER:
General Manager Jim Herberg reminded the Committee about OCSD's upcoming 65tn
Anniversary Open House & Centrifuge Ribbon Cutting VIP event on Saturday, July 27
from 9:00 a.m. to 12:00 p.m.
REPORT OF COMMITTEE CHAIR:
Chair Collacott did not provide a report.
CONSENT CALENDAR:
1. APPROVAL OF MINUTES (Clerk of the Board)
MOVED, SECONDED, AND DULY CARRIED TO: Approve Minutes of the
Regular meeting of the Operations Committee held on June 5, 2019.
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
2. PLANT NO. 2 TRICKLING FILTER INFLUENT (FEED) PUMP REPAIRS
(Rob Thompson)
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Approve a Sole Source Purchase Order to Vaughan's Industrial Repair Co.,
Inc for the repair and reinstallation of six influent pumps at the Plant No. 2
Trickling Filter Pump Station, for a total amount not to exceed $631,010-1
and
B. Approve a contingency of$126,202 (20%).
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
07/10/2019 Operations Committee SPECIAL MEETING Minutes Page 2 of 7
3. RENEWAL AGREEMENT FOR LIQUID OXYGEN PURCHASE AND
ASSOCIATED VAPORIZATION SYSTEM MAINTENANCE SPECIFICATION
NO. C-2018-926BD
(Rob Thompson)
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Approve Amendment No. 1 for a unit price increase of $0.0535 per centum
cubic feet (22.8%) to the chemical supplier agreement with Airgas USA,
LLC for the purchase of liquid oxygen, Specification No. C-2018-926BD, for
the period beginning August 21, 2019 through August 20, 2020 for a unit
price of $0.288 per centum cubic feet delivered, plus applicable sales tax,
for a total estimated annual amount of $496,512; and
B. Authorize unit price adjustment of up to 15% annually using mutually
acceptable price indices for subsequent agreement renewal periods.
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
4. HEADWORKS REHABILITATION AND EXPANSION AT PLANT NO. 1,
PROJECT NO. P1-105 (Kathy Millea)
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Consider, receive, and file the Mitigated Negative Declaration and
Mitigation Monitoring and Reporting Program for the Headworks
Rehabilitation and Expansion at Plant No. 1, Project No. P1-105, prepared
by Carollo and Environmental Science Associates; and
B. Adopt Resolution No. OCSD 19-XX, entitled: "A Resolution of the Board of
Directors of the Orange County Sanitation District adopting the Mitigated
Negative Declaration for the Headworks Rehabilitation and Expansion at
Plant No. 1, Project No. P1-105, adopting a Mitigation Monitoring and
Reporting Program, and approving the Headworks Rehabilitation and
Expansion at Plant No. 1, Project No. P1-105."
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
07/10/2019 Operations Committee SPECIAL MEETING Minutes Page 3 of 7
NON-CONSENT:
5. PLANT NO. 2 TRUCKLOADING AUGER REPLACEMENT
(Rob Thompson)
Assistant General Manager Rob Thompson provided a brief description of the item
and the need for the procurement.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Approve a Sole Source Purchase Order to Putzmeister for the procurement
of up to 12 replacement Putzmeister augers along with their associated
mounting components including gear motor assembly for the Plant No. 2
truckloading facility, for a total amount not to exceed $663,359;
B. Approve payment of $198,008 (30%) of the not-to-exceed amount at the
time of order; and
C. Approve a contingency of $132,672 (20%).
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
6. SLUDGE DEWATERING AND ODOR CONTROL AT PLANT NO. 2,
PROJECT NO. P2-92 (Kathy Millea)
Director of Engineering Kathy Millea introduced Engineering Manager Dean Fisher
who provided a PowerPoint presentation which included: project scope,
objectives, and current status; lead and asbestos abatement; and contingency
status
Mr. Fisher responded to questions regarding the contingency costs.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to: Approve a contingency increase of$498,500 (1%) to the construction
contract with Shimmick Construction Company, Inc. for Sludge Dewatering and
Odor Control at Plant No. 2, Project No. P2-92, for a total contingency of
$2,991,000 (6%).
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
07/10/2019 Operations Committee SPECIAL MEETING Minutes Page 4 of 7
7. SLUDGE DEWATERING AND ODOR CONTROL AT PLANT NO. 1, PROJECT
NO. P1-101 (Kathy Millea)
Ms. Millea introduced Engineering Manager Jeff Mohr who provided a PowerPoint
presentation which included: project objectives, scope, and status; project
challenges; consultant costs; troubleshooting; and the current contingency status.
In response to a question from Board Chair Shawver, Mr. Thompson described the
contingency process and the percentages requested.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to: Approve a contingency increase of$357,000 (5%) to the Professional
Consultant Services Agreement with HDR Engineering, Inc. to provide
construction support services for Sludge Dewatering and Odor Control at Plant No.
1, Project No. P1-101, for a total contingency amount of $2,499,000 (35%).
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
8. RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT ACTIVATED
SLUDGE PLANT NO. 1, PROJECT NO. P1-129 (Kathy Millea)
Engineering Manager Jeff Mohr provided a PowerPoint presentation which
included: a brief overview of the RAS piping replacement and the construction
challenges necessitating the budget increase.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to:
A. Approve a budget increase of $1,300,000 for Return Activated Sludge
Piping Replacement at Activated Sludge Plant No. 1, Project No. P1-129,
for a total budget of $10,300,000;
B. Approve a Professional Construction Services Agreement with AECOM
Technical Services, Inc. to provide construction support services for Return
Activated Sludge Piping Replacement at Activated Sludge Plant No. 1,
Project No. P1-129, for a total amount not to exceed $140,000; and
C. Approve a contingency related to the Professional Construction Services
Agreement of $14,000 (10%).
AYES: Avery, Bernstein, Chaffee, Collacott, Hawkins, S. Jones,
Kring, Massa-Lavitt, Shaw, Shawver, Silva, F. Smith, Withers,
and Yarc
NOES: None
ABSTENTIONS: None
ABSENT: None
07/10/2019 Operations Committee SPECIAL MEETING Minutes Page 5 of 7
INFORMATION ITEMS:
9. ORANGE COUNTY SANITATION DISTRICT ENVIRONMENTAL SERVICES
LABORATORY AND OCEAN MONITORING UP-DATE (Lan Wiborg)
Each month, staff provides an informational presentation on topics of interest to
the Board of Directors. This month's topic: Orange County Sanitation District
Environmental Services Laboratory, Monitoring, and Compliance Division (LMC):
Protecting Public Health and the Environment.
Ron Coss, Environmental Lab & Ocean Monitoring Manager, provided an
informative PowerPoint presentation that reviewed the structure of the
Environmental Services Department, environmental monitoring done by the
Sanitation District, laboratory functions and instruments, accreditation, 2018-19
Orange County beach report card, future endeavors, projects, and partners. Mr.
Coss announced an upcoming Nerissa Rig Fishing Cruise would be available on
July 29 and July 30 and indicated that if there was interest in attending to please
contact the Clerk of the Board.
10. INTERIM FOOD WASTE RECEIVING FACILITY, PROJECT NO. P2-124
(Kathy Millea)
Staff presented information regarding proposed Interim Food Waste Receiving
Facility, Project No. P2-124, which included a project viability review that verified
that the project is economically justifiable based on project costs and anticipated
tipping fees.
Ms. Millea provided background information on this item and introduced Jacob
Dalgoff, Senior Engineer, who provided a PowerPoint presentation that included
information regarding the project, digester feed detail, layout, project viability,
market conditions, and schedule.
Board Chair Shawver expressed interest in revisiting tonnage fees, the pay-back
period, recouping capital costs, and finding an end-market.
DEPARTMENT HEAD REPORTS:
Ms. Millea provided information on the Tesla battery project, describing the equipment
and noting that this is the largest battery project in the United States. The Board inquired
on having a tour of this project.
CLOSED SESSION:
None.
07/10/2019 Operations Committee SPECIAL MEETING Minutes Page 6 of 7
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS,
IF ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT
Chair Collacott declared the meeting adjourned at 6:14 p.m. to the meeting to be held on
Wednesday, September 4, 2019 at 5:00 p.m.
S
ubmitted by,
re, MMC
t e Board
07/10/2019 Operations Committee SPECIAL MEETING Minutes Page 7 of 7
MINUTES OF THE
ADMINISTRATION COMMITTEE
Orange County Sanitation District
Wednesday, July 17, 2019 at 5:00 P.M.
A regular meeting of the Administration Committee of the Orange County Sanitation
District was called to order by Committee Chairman Chad Wanke on July 17, 2019 at
5:04 p.m. in the Administration Building of the Orange County Sanitation District. Director
Glenn Parker led the Flag Salute.
A quorum was declared present as follows:
COMMITTEE MEMBERS PRESENT: STAFF PRESENT:
Chad Wanke, Chairman Jim Herberg, General Manager
Richard Murphy, Vice-Chairman Rob Thompson, Assistant General Manager
James Ferryman Lorenzo Tyner, Assistant General Manager
Cecilia Iglesias Celia Chandler, Director of Human Resources
Peter Kim Kathy Millea, Director of Engineering
Mark Murphy Tina Knapp, Assistant Clerk of the Board
Steve Nagel Janine Aguilar
Andrew Nguyen Jeff Armstrong
Glenn Parker Stephanie Barron
Erik Peterson Jennifer Cabral
Christina Shea Megan Carlson
David Shawver, Board Chairman Sam Choi
John Withers, Board Vice-Chairman Ron Coss
Jacob Dalgoff
COMMITTEE MEMBERS ABSENT: Rhea de Guzman
None. Lisa Frigo
Laura Maravilla
Josh Martinez
Cory Mayne
Tom Meregillano
Jeff Mohr
Wally Ritchie
Annalisa Saqui
OTHERS PRESENT:
Brad Hogin, General Counsel
Karen Delaney, Alliant
PUBLIC COMMENTS:
None.
07/17/2019 Administration Committee Minutes Page 1 of 4
REPORTS:
Chair Wanke expressed appreciation to Vice-Chairman Richard Murphy for facilitating the
Committee meeting while he was on vacation.
General Manager Jim Herberg reminded the Committee about OCSD's 65th Anniversary
Open House & Centrifuge Ribbon Cutting VIP event on Saturday, July 27 from
9:00 am-noon.
CONSENT CALENDAR:
1. APPROVAL OF MINUTES (Clerk of the Board)
MOVED, SECONDED, AND DULY CARRIED TO: Approve Minutes of the
June 12, 2019 Administration Committee Meeting.
AYES: Ferryman, Iglesias, Kim, M. Murphy, R. Murphy, Nagel,
Nguyen, Parker, Peterson, Shawver, Shea, Wanke and Withers
NOES: None
ABSTENTIONS: None
ABSENT: None
2. LABORATORY SERVICES FOR CONTINGENCY TESTING AND SPECIAL
PROJECTS (Lan Wiborg)
MOVED, SECONDED, AND DULY CARRIED TO: Approve a purchase order
contract to Weck Laboratories, Inc. to provide special project support testing
services in an amount not to exceed $110,430 for the period of July 1, 2019 to
June 30, 2020.
AYES: Ferryman, Iglesias, Kim, M. Murphy, R. Murphy, Nagel,
Nguyen, Parker, Peterson, Shawver, Shea, Wanke and Withers
NOES: None
ABSTENTIONS: None
ABSENT: None
NON-CONSENT:
3. 2020 BENEFITS INSURANCE RENEWAL (Celia Chandler)
Director of Human Resources Celia Chandler provided an overview of this item.
Board Vice-Chair John Withers inquired as to the intent of the 5% contingency
requested and asked staff to report to the Committee as to the use of the
contingency in a timeframe to be determined by staff.
MOVED. SECONDED, AND DULY CARRIED TO: Recommend to the Board of
Directors to: Approve the Orange County Sanitation District 2020 Benefits
Insurance Renewal for the overall not-to-exceed amount of $13,137,895; and a
07/17/2019 Administration Committee Minutes Page 2 of 4
one-time adjustment to 2019 Health & Welfare Insurance purchase order for the
not-to-exceed (NTE) amount of$230,000, as specified below:
A. WORKTERRA (medical, dental, and vision plans; Health Savings Accounts
[HSA]; and Employee Assistance Program [EAP]) — Not to Exceed
$12,377,584;
B. Prudential (basic life, short- and long-term disability) — Not to Exceed
$730,311;
C. The Standard (EMT & Manager disability) — Not to Exceed $30,000; and
D. Approve a contingency of$656,895 (5%).
E. For the 2019 Plan Year, approve a one-time reallocation from the 2019
operating budget in the amount of$230,000 to be transferred to group health
insurance benefits, resulting in a change in the total cost approved by the
Board, from $12,894,770 to $13,124,770. The reallocation would not result
in an increase to the overall 2019 budget.
AYES: Ferryman, Iglesias, Kim, M. Murphy, R. Murphy, Nagel,
Nguyen, Parker, Peterson, Shawver, Shea,Wanke and Withers
NOES: None
ABSTENTIONS: None
ABSENT: None
INFORMATION ITEMS:
4. ORANGE COUNTY SANITATION DISTRICT ENVIRONMENTAL SERVICES
LABORATORY AND OCEAN MONITORING UP-DATE (Lan Wiborg)
Each month, staff provides an informational presentation on topics of interest to
the Board of Directors. This month's topic: Orange County Sanitation District
Environmental Services Laboratory, Monitoring, and Compliance Division (LMC):
Protecting Public Health and the Environment. Ron Coss, Environmental Lab &
Ocean Monitoring Manager, provided a PowerPoint presentation that reviewed the
structure of the Environmental Services Department, environmental monitoring
done by the Sanitation District, laboratory functions and instruments, accreditation,
2018-19 Orange County beach report card, future endeavors, projects, and
partners.
Board Chair Dave Shawver reminded the Committee about the upcoming Nerissa
Rig Fishing Cruise dates and indicated that information about the cruise is in the
blue folders.
5. INTERIM FOOD WASTE RECEIVING FACILITY, PROJECT NO. P2-124
(Kathy Millea)
Kathy Millea, Director of Engineering, provided background information on this
item and introduced Jacob Dalgoff, Senior Engineer, who provided a PowerPoint
07/17/2019 Administration Committee Minutes Page 3 of 4
presentation that included information regarding the project, digester feed detail,
layout, project viability, market conditions, and schedule.
Board Chair Shawver expressed interest in revisiting tonnage fees, the pay-back
period, thoroughly exploring inflow commitments, recouping capital costs, and
finding an end-market. Committee Chair Wanke feels that the Committee should
consider two policy issues: cost recovery and consideration of additional fees for
flow frorn outside of our service area. Ms. Millea indicated that policy
considerations will be forthcoming within the next year. Mr. Herberg indicated that
discussions will be had as to how these policy matters will be presented to the
Board of Directors and the various Committees. Director Parker indicated that this
project will also have an impact on the business community, which should be
considered in addition to policy matters.
DEPARTMENT HEAD REPORTS:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA ITEMS,
IF ANY:
None.
ADJOURNMENT:
Chair Wanke declared the meeting adjourned at 5.52 p.m. to the Regular meeting to be
held on Wednesday, September 11, 2019 at 5:00 p.m.
Submitted by:
T(4,L ((it s
Tina Knapp, MMC
Assistant Clerk of the Board
07/17/2019 Administration Committee Minutes Page 4 of 4
MINUTES OF THE
STEERING COMMITTEE
Orange County Sanitation District
Wednesday, July 24, 2019 at 5:00 p.m.
A regular meeting of the Steering Committee of the Orange County Sanitation
District was called to order by Board Chairman David Shawver on Wednesday,
July 24, 2019 at 5:00 p.m. in the Administration Building of the Orange County
Sanitation District.
A quorum was declared present, as follows:
COMMITTEE MEMBERS PRESENT: STAFF PRESENT:
David Shawver, Board Chair Jim Herberg, General Manager
John Withers, Board Vice-Chair Rob Thompson, Assistant General
Robert Collacott, Operations Committee Manager
Chair Lorenzo Tyner, Assistant General
Peter Kim, LaPA Committee Chair Manager
Chad Wanke, Administration Committee Celia Chandler, Director of Human
Chair Resources
Glenn Parker, Member-At-Large Kathy Millea, Director of Engineering
Tim Shaw, Member-At-Large Lan Wiborg, Director of Environmental
Services
COMMITTEE MEMBERS ABSENT: Kelly Lore, Clerk of the Board
None. Stephanie Barron
Megan Carlson
Thys DeVries
Mike Dorman
Dean Fisher
Tom Grant
Chris Johnson
Lori Klinger
Tina Knapp
Rebecca Long
Laura Maravilla
Joshua Martinez
Andrew Nau
Adam Nazaroff
Wally Ritchie
Ruth Zintzun
OTHERS PRESENT:
Brad Hogin, General Counsel
Laura Kalty, Liebert Cassidy Whitmore,
Special Counsel
07/24/2019 Steering Committee Minutes Page 1 of 5
PUBLIC COMMENTS:
Clerk of the Board Kelly Lore stated that correspondence had been received from the
General Manager which was distributed to the Board of Directors.
REPORTS:
Chair Shawver did not provide a report.
General Manager Jim Herberg did not provide a report.
CONSENT CALENDAR:
1. APPROVAL OF MINUTES (Clerk of the Board)
MOVED, SECONDED, AND DULY CARRIED TO: Approve Minutes of the
Special Meeting of the Steering Committee held June 26, 2019.
AYES: Collacott, Kim, Parker, Shaw, Shawver, and Wanke
NOES: None
ABSTENTIONS: None
ABSENT: Withers
Board Vice-Chair Withers arrived at the meeting at 5:02 p.m.
NON-CONSENT ITEMS:
General Counsel Brad Hogin stated a recusal on Item Nos. 2 and 3 due to a conflict
of interest with the County of Orange and left the room during the discussion.
2. RIGHT OF ENTRY AGREEMENT (Lorenzo Tyner)
Assistant General Manager Lorenzo Tyner provided a brief overview of the item.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board
of Directors to:
A. Approve a Right of Entry Agreement for Orange County Transportation
Authority, and its authorized agents, to enter upon Orange County
Sanitation District's property located on the north side of Westminster
Boulevard, East of Springdale Street, in Westminster, CA adjacent to
the Interstate 405 Freeway for temporary use in connection with its
project to widen the Interstate 405 Freeway for a term of four (4) years
from the 30-day notice prior to the beginning of construction, in a form
approved by Special Counsel; and
B. Direct the Clerk of the Board to record the Agreement with the Orange
County Clerk-Recorder.
09/28/2016 Steering Committee Minutes Page 2 of 5
AYES: Collacott, Kim, Parker, Shaw, Shawver, Wanke and
Withers
NOES: None
ABSTENTIONS: None
ABSENT: None
3. FIRST AMENDMENT TO 800 MHZ LEASE (Lorenzo Tyner)
Assistant General Manager Lorenzo Tyner provided a brief overview of the item.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board
of Directors to: Approve the First Amendment to the 800 MHz Lease
Agreement with the County of Orange with the following modifications, in a
form approved by Special Counsel:
• Term of Lease shall expire May 4, 2023; with an optional one (1) additional
five-year period
• Increase the annual lease rate from $0.42 per square foot to $0.52 per
square foot
• Decrease the site footprint from 10,000 square feet to 4,784 square feet
before December 31, 2019.
AYES: Collacott, Kim, Parker, Shaw, Shawver, Wanke and
Withers
NOES: None
ABSTENTIONS: None
ABSENT: None
4. COOPERATIVE AGREEMENT FOR INTEGRATED REGIONAL WATER
MANAGEMENT FUNDING IN THE SANTA ANA FUNDING AREA
(Lan Wiborg)
Director of Environmental Services Lan Wiborg provided a brief overview of the
history of the item and its purpose.
MOVED, SECONDED, AND DULY CARRIED TO: Recommend to the Board
of Directors to: Approve a Cooperative Agreement among the County of
Orange, Orange County Sanitation District, Orange County Water District
(collectively referred to as Orange County Parties), and the Santa Ana
Watershed Project Authority (SAWPA), a joint powers authority, for the Orange
County Parties agreeing to remain a part of the Santa Ana Funding Area
covered by the One Water One Watershed Plan for a period of ten (10) years,
from date of execution.
AYES: Collacott, Kim, Parker, Shaw, Shawver, Wanke and
Withers
NOES: None
07/24/2019 Steering Committee Minutes Page 3 of 5
ABSTENTIONS: None
ABSENT: None
5. STRATEGIC PLAN SURVEY RESULTS (Rob Thompson)
Assistant General Manager Rob Thompson provided a brief overview of the
item noting that there were eight responses from the Board of Directors which
were provided to the Committee. He stated that staff will proceed with creating
position papers and will bring those to the Board of Directors meetings in August
and September, with a Special Strategic Plan Workshop in September as well.
MOVED, SECONDED, AND DULY CARRIED TO: Receive and file the
strategic plan survey results from the Board of Directors in June 2019.
AYES: Collacott, Kim, Parker, Shaw, Shawver, Wanke and
Withers
NOES: None
ABSTENTIONS: None
ABSENT: None
INFORMATION ITEMS:
6. UPDATE ON THE HEADQUARTERS COMPLEX AND SITE SECURITY AT
PLANT NO. 1, PROJECT NO. P1-128 (Kathy Millea)
Ms. Millea presented a brief update on the recently submitted design package,
with renderings, project budget, and the project schedule. She stated that staff
is working closely to accelerate the proposed schedule. The committee
expressed concerns regarding maintenance of the building, security of the
Boardroom with the exposed glass window, and traffic control during
construction.
CLOSED SESSION
CONVENED IN CLOSED SESSION PURSUANT TO GOVERNMENT CODE
SECTIONS 54957(b)(1), 54957.6 & 54956.9(d)(4):
The Board convened in closed session at 5:21 p.m. to discuss three items.
Confidential minutes of the Closed Sessions have been prepared in accordance with
the above Government Code Sections and are maintained by the Clerk of the Board
in the Official Book of Confidential Minutes of Board and Committee Closed Session
Meetings.
RECONVENED IN REGULAR SESSION:
The Board reconvened in regular session at 6:01 p.m.
07/24/2019 Steering Committee Minutes Page 4 of 5
CONSIDERATION OF ACTION, IF ANY, ON MATTERS CONSIDERED IN CLOSED
SESSION:
General Counsel Brad Hogin did not provide a report.
OTHER BUSINESS AND COMMUNICATIONS OR SUPPLEMENTAL AGENDA
ITEMS, IF ANY:
None.
BOARD OF DIRECTORS INITIATED ITEMS FOR A FUTURE MEETING:
None.
ADJOURNMENT:
Chair Shawver declared the meeting adjourned at 6:02 p.m. to the next Steering
Committee meeting to be held on Wednesday, August 28, 2019 at 5:00 p.m.
Sub itted by:
Kell A. L e, WC
Cle k of t e Board
07/24/2019 Steering Committee Minutes Page 5 of 5
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
BOARD OF DIRECTORS (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-577 Agenda Date: 9/25/2019 Agenda Item No: 3.
FROM: James D. Herberg, General Manager
Originator: Lorenzo Tyner, Assistant General Manager
SUBJECT:
REPORT OF THE INVESTMENT TRANSACTIONS FOR THE MONTH OF AUGUST 2019
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Receive and file the following:
Report of the Investment Transactions for the month of August 2019.
BACKGROUND
The CA Government Code requires that a monthly report of investment transactions be provided to
the legislative body. Attached is the monthly report of investment transactions for the month ended
August 31, 2019.
RELEVANT STANDARDS
• CA Government Code Section 53607
PRIOR COMMITTEE/BOARD ACTIONS
N/A
FINANCIAL CONSIDERATIONS
N/A
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Report of the Investment Transactions for the Month of August 2019
Orange County Sanitation District Page 1 of 1 Printed on 9/19/2019
powered by LegistarTM
U.S. Bank
Transaction History
August 2019
Entry Date CUSIP Id Explanation Units Price Net Cash Amt Cost Gain/Loss
ACQUISITIONS
08/02/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 13,196.2900 1.000000 -13,196.29 13,196.29 0.00
08/02/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 29,177.6400 1.000000 -29,177.64 29,177.64 0.00
08/05/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 61,458.3400 1.000000 -61,458.34 61,458.34 0.00
08/06/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 85,050.0000 1.000000 -85,050.00 85,050.00 0.00
08/07/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 32,500.0000 1.000000 -32,500.00 32,500.00 0.00
08/08/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 23,598.7500 1.000000 -23,598.75 23,598.75 0.00
08/09/2019 06051GFN4 PURCHASED PAR VALUE OF BANK OF AMERICA MTN 2.250% 4/21/20/MORGAN 2,000,000.0000 1.000980 -2,001,960.00 2,001,960.00 0.00
STANLEY&CO. LLC/2,000,000 PAR VALUE AT 100.098%
08/09/2019 747525AD5 PURCHASED PAR VALUE OF QUALCOMM INC 2.250% 5/20/20/BARCLAYS 2,000,000.0000 1.001350 -2,002,700.00 2,002,700.00 0.00
CAPITAL INC.FIXED IN/2,000,000 PAR VALUE AT 100.135%
08/12/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 6,498.0000 1.000000 -6,498.00 6,498.00 0.00
08/12/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 1,083,000.0000 1.000000 -1,083,000.00 1,083,000.00 0.00
08/14/2019 3133EKWV4 PURCHASED PAR VALUE OF F F C B DEB 1.850% 7/26/24/J.P.MORGAN 5,000,000.0000 1.009656 -5,048,280.00 5,048,280.00 0.00
SECURITIES LLC/5,000,000 PAR VALUE AT 100.9656%
08/15/2019 369550BA5 PURCHASED PAR VALUE OF GENERAL DYNAMICS 2.875% 5/11/20/PERSHING 2,000,000.0000 1.005670 -2,011,340.00 2,011,340.00 0.00
LLC/2,000,000 PAR VALUE AT 100.567%
08/15/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 22,241.2500 1.000000 -22,241.25 22,241.25 0.00
08/15/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,462,512.3700 1.000000 -3,462,512.37 3,462,512.37 0.00
08/15/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 28,481.4000 1.000000 -28,481.40 28,481.40 0.00
08/16/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 89,062.5000 1.000000 -89,062.50 89,062.50 0.00
08/19/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 3,290,000.0000 1.000000 -3,290,000.00 3,290,000.00 0.00
08/19/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 11,522,306.1200 1.000000 -11,522,306.12 11,522,306.12 0.00
08/20/2019 62479MYK3 PURCHASED PAR VALUE OF MUFG BANK LTD NY BRAN C P 11/19/19/MUFG UNION 1,860,000.0000 0.994641 -1,850,032.47 1,850,032.47 0.00
BK NA/MMI/PIMS/IPA/1,860,000 PAR VALUE AT 99.46411129%
08/20/2019 62479MYK3 PURCHASED PAR VALUE OF MUFG BANK LTD NY BRAN C P 11/19/19/MUFG UNION 11,255,000.0000 0.994641 -11,194,685.71 11,194,685.71 0.00
BK NA/MMI/PIMS/IPA/11,255,000 PAR VALUE AT 99.46411115%
08/20/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 1,974.5400 1.000000 -1,974.54 1,974.54 0.00
08/21/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 9,759.5800 1.000000 -9,759.58 9,759.58 0.00
08/23/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 45,000.0000 1.000000 -45,000.00 45,000.00 0.00
08/26/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 16,125.0000 1.000000 -16,125.00 16,125.00 0.00
08/26/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 139,881.5700 1.000000 -139,881.57 139,881.57 0.00
08/27/2019 43815NABO PURCHASED PAR VALUE OF HONDA AUTO 1.900% 4/15/22/SG AMERICAS 3,530,000.0000 0.999930 -3,529,752.90 3,529,752.90 0.00
SECURITIES,LLC/3,530,000 PAR VALUE AT 99.993%
08/27/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 1,504,012.5000 1.000000 -1,504,012.50 1,504,012.50 0.00
08/27/2019 31846V567 PURCHASED UNITS OF FIRST AM GOVT OB FD CL Z 2,005,350.0000 1.000000 -2,005,350.00 2,005,350.00 0.00
1 of 7
U.S. Bank
Transaction History
August 2019
Entry Date CUSIP Id Explanation Units Price Net Cash Amt Cost Gain/Loss
08/28/2019 912796VW6 PURCHASED PAR VALUE OF U S TREASURY BILL 9/24/19/NOMURA 1,650,000.0000 0.998468 -1,647,472.41 1,647,472.41 0.00
SECURITIES INTERNATIONA/1,650,000 PAR VALUE AT 99.84681273%
08/28/2019 912796SL4 PURCHASED PAR VALUE OF U S TREASURY BILL 10/03/19/NOMURA 1,650,000.0000 0.997993 -1,646,687.63 1,646,687.63 0.00
SECURITIES INTERNATIONA/1,650,000 PAR VALUE AT 99.7992503%
08/28/2019 912828UL2 PURCHASED PAR VALUE OF U S TREASURY NT 1.375% 1/31/20/GOLDMAN SACHS 5,000,000.0000 0.997734 -4,988,671.88 4,988,671.88 0.00
&CO.LLC/5,000,000 PAR VALUE AT 99.7734376%
TOTAL ACQUISITIONS 59,416,185.8500 -59,392,768.85 59,392,768.85 0.00
DISPOSITIONS
08/12/2019 69371RN36 MATURED PAR VALUE OF PACCAR FINANCIAL MTN 1.200% 8/12/19 1,083,000 PAR -1,083,000.0000 1.000000 1,083,000.00 -1,069,484.16 13,515.84
VALUE AT 100%
08/15/2019 02665WAH4 MATURED PAR VALUE OF AMERICAN HONDA MTN 2.250% 8/15/19 2,500,000 PAR -2,500,000.0000 1.000000 2,500,000.00 -2,531,985.00 -31,985.00
VALUE AT 100%
08/15/2019 3133TCE95 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 4.016% 8/15/32 -327.6500 0.000000 327.65 -327.99 -0.34
08/15/2019 31348SWZ3 PAID DOWN PAR VALUE OF F H L M C#786064 4.677% 1/01/28 JULY FHLMC DUE -17.5100 0.000000 17.51 -17.08 0.43
8/15/19
08/15/2019 47788BAD6 PAID DOWN PAR VALUE OF JOHN DEERE OWNER 1.820% 10/15/21 -41,039.5800 10.101764 41,039.58 -41,036.58 3.00
08/15/2019 89238BAB8 PAID DOWN PAR VALUE OF TOYOTA AUTO 2.100%10/15/20 -369,146.5800 1.123056 369,146.58 -369,108.85 37.73
08/15/2019 47788CAB8 PAID DOWN PAR VALUE OF JOHN DEERE OWNER 2.420% 10/15/20 -158,985.8800 2.607604 158,985.88 -158,662.94 322.94
08/15/2019 65478VAD9 PAID DOWN PAR VALUE OF NISSAN AUTO 1.320% 1/15/21 -87,902.0400 4.716297 87,902.04 -87,198.14 703.90
08/15/2019 47788NADO PAID DOWN PAR VALUE OF JOHN DEERE OWNER 1.490% 5/15/23 -42,667.9300 9.716248 42,667.93 -41,961.24 706.69
08/15/2019 65478GAD2 PAID DOWN PAR VALUE OF NISSAN AUTO 1.750%10/15/21 -202,815.7200 2.044083 202,815.72 -199,670.49 3,145.23
08/15/2019 02665WAH4 MATURED PAR VALUE OF AMERICAN HONDA MTN 2.250% 8/15/19 1,977,000 PAR -1,977,000.0000 1.000000 1,977,000.00 -1,972,709.91 4,290.09
VALUE AT 100%
08/19/2019 43814RACO PAID DOWN PAR VALUE OF HONDA AUTO 1.210% 12/18/20 -131,592.8900 0.000000 131,592.89 -130,148.45 1,444.44
08/19/2019 43814PAC4 PAID DOWN PAR VALUE OF HONDA AUTO 1.790% 9/20/21 -196,780.7500 0.000000 196,780.75 -193,659.93 3,120.82
08/20/2019 36225CC20 PAID DOWN PAR VALUE OF G N M A 1 I#080088 3.875% 6/20/27 JULY GNMA DUE -175.0500 0.000000 175.05 -178.88 -3.83
8/20/19
08/20/2019 36225CAZ9 PAID DOWN PAR VALUE OF G N M A 1 1#080023 4.125% 12/20/26 JULY GNMA DUE -159.4000 0.000000 159.40 -162.03 -2.63
8/20/19
08/20/2019 36225DCB8 PAID DOWN PAR VALUE OF G N M A 1 1#080965 3.750% 7/20/34 JULY GNMA DUE -225.8200 0.000000 225.82 -225.68 0.14
8/20/19
08/20/2019 36225CNM4 PAID DOWN PAR VALUE OF G N M A 1 1#080395 3.875% 4/20/30 JULY GNMA DUE -41.7300 0.000000 41.73 -41.35 0.38
8/20/19
08/20/2019 36225CN28 PAID DOWN PAR VALUE OF G N M A 1 1#080408 3.875% 5/20/30 JULY GNMA DUE -935.2900 0.000000 935.29 -925.79 9.50
8/20/19
08/26/2019 31398VJ98 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 4.251% 1/25/20 -34,844.9200 0.000000 34,844.92 -36,821.28 -1,976.36
08/26/2019 31394JY35 PAID DOWN PAR VALUE OF F H L M C MLTCL MTG 6.500% 9/25/43 -2,847.9200 0.000000 2,847.92 -3,225.27 -377.35
2 of 7
U.S. Bank
Transaction History
August 2019
Entry Date CUSIP Id Explanation Units Price Net Cash Amt Cost Gain/Loss
08/26/2019 31406PQY8 PAID DOWN PAR VALUE OF F N M A#815971 5.000% 3/01/35 JULY FNMA DUE -3,829.3500 0.000000 3,829.35 -4,116.55 -287.20
8/25/19
08/26/2019 3141OF4V4 PAID DOWN PAR VALUE OF F N M A#888336 5.000% 7/01/36 JULY FNMA DUE -2,768.1900 0.000000 2,768.19 -2,975.80 -207.61
8/25/19
08/26/2019 31376KT22 PAID DOWN PAR VALUE OF F N M A#357969 5.000% 9/01/35 JULY FNMA DUE -2,305.8700 0.000000 2,305.87 -2,478.81 -172.94
8/25/19
08/26/2019 31403DJZ3 PAID DOWN PAR VALUE OF F N M A#745580 5.000% 6/01/36 JULY FNMA DUE -1,200.6000 0.000000 1,200.60 -1,290.64 -90.04
8/25/19
08/26/2019 31407BXH7 PAID DOWN PAR VALUE OF F N M A#826080 5.000% 7/01/35 JULY FNMA DUE -589.9700 0.000000 589.97 -634.22 -44.25
8/25/19
08/26/2019 31417YAY3 PAID DOWN PAR VALUE OF F N M A#MA0022 4.500% 4/01/29 JULY FNMA DUE -313.7600 0.000000 313.76 -331.83 -18.07
8/25/19
08/26/2019 3138EG6F6 PAID DOWN PAR VALUE OF F N M A#AL0869 4.500% 6/01/29 JULY FNMA DUE -237.8800 0.000000 237.88 -251.58 -13.70
8/25/19
08/26/2019 31371 NUC7 PAID DOWN PAR VALUE OF F N M A#257179 4.500% 4/01/28 JULY FNMA DUE -133.6400 0.000000 133.64 -141.34 -7.70
8/25/19
08/26/2019 31403GXF4 PAID DOWN PAR VALUE OF F N M A#748678 5.000% 10/01/33 JULY FNMA DUE -8.9000 0.000000 8.90 -9.57 -0.67
8/25/19
08/26/2019 31397QREO PAID DOWN PAR VALUE OF F N M A GTD REMIC 1.113% 2/25/41 -4,128.0900 0.000000 4,128.09 -4,126.80 1.29
08/26/2019 31406XWT5 PAID DOWN PAR VALUE OF F N M A#823358 4.722% 2/01/35 JULY FNMA DUE -443.0000 0.000000 443.00 -439.54 3.46
8/25/19
08/26/2019 31381PDA3 PAID DOWN PAR VALUE OF F N M A#466397 3.400% 11/01/20 JULY FNMA DUE -697.4800 0.000000 697.48 -682.39 15.09
8/25/19
08/26/2019 03215PFN4 PAID DOWN PAR VALUE OF AMRESCO 6.88883% 6/25/29 -5,170.7400 0.000000 5,170.74 -3,882.90 1,287.84
08/27/2019 46625HKA7 PURCHASE OFFER PAR VALUE OF JPMORGAN CHASE CO 2.250% 1/23/20 -2,000,000.0000 1.000550 2,001,100.00 -1,994,880.00 6,220.00
/TENDER/PURCHASE OFFER/TENDER OFFER PAID AT$1000.55 PER$1000
08/27/2019 46625HKA7 PURCHASE OFFER PAR VALUE OF JPMORGAN CHASE CO 2.250% 1/23/20 -1,500,000.0000 1.000550 1,500,825.00 -1,490,940.00 9,885.00
/TENDER/PURCHASE OFFER/TENDER OFFER PAID AT$1000.55 PER$1000
TOTAL DISPOSITIONS -10,352,334.1300 10,354,259.13 -10,344,733.01 9,526.12
OTHER TRANSACTIONS
08/01/2019 31846V567 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 0.0000 0.000000 13,196.29 0.00 0.00
7/31/2019 INTEREST FROM 7/1/19 TO 7/31/19
08/01/2019 31846V567 INTEREST EARNED ON FIRST AM GOVT OB FD CL Z UNIT ON 0.0000 SHARES DUE 0.0000 0.000000 29,177.64 0.00 0.00
7/31/2019 INTEREST FROM 7/1/19 TO 7/31/19
08/05/2019 3135GOV34 INTEREST EARNED ON F N M A 2.500% 2/05/24$1 PV ON 5000000.0000 0.0000 0.000000 61,458.34 0.00 0.00
SHARES DUE 8/5/2019
08/06/2019 44932HAH6 INTEREST EARNED ON IBM CREDIT CORP 3.000% 2/06/23$1 PV ON 5670000.0000 0.0000 0.000000 85,050.00 0.00 0.00
SHARES DUE 8/6/2019
3 of 7
U.S. Bank
Transaction History
August 2019
Entry Date CUSIP Id Explanation Units Price Net Cash Amt Cost Gain/Loss
08/07/2019 06406RAA5 INTEREST EARNED ON BANK OF NY MTN 2.600% 2/07/22$1 PV ON 2500000.0000 0.0000 0.000000 32,500.00 0.00 0.00
SHARES DUE 8/7/2019
08/08/2019 594918BP8 INTEREST EARNED ON MICROSOFT CORP 1.550% 8/08/21 $1 PV ON 3045000.0000 0.0000 0.000000 23,598.75 0.00 0.00
SHARES DUE 8/8/2019
08/09/2019 06051 GFN4 PAID ACCRUED INTEREST ON PURCHASE OF BANK OF AMERICA MTN 2.250% 0.0000 0.000000 -13,500.00 0.00 0.00
4/21/20
08/09/2019 747525AD5 PAID ACCRUED INTEREST ON PURCHASE OF QUALCOMM INC 2.250% 5/20/20 0.0000 0.000000 -9,875.00 0.00 0.00
08/09/2019 31846V567 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -4,028,035.0000 1.000000 4,028,035.00 -4,028,035.00 0.00
08/12/2019 69371 RN36 INTEREST EARNED ON PACCAR FINANCIAL MTN 1.200% 8/12/19$1 PV ON 0.0000 0.000000 6,498.00 0.00 0.00
1083000.0000 SHARES DUE 8/12/2019 INTEREST ON 8/12/19 MATURITY
08/13/2019 912828WUO BOOK VALUE OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1768.00 UNITS 0.0000 0.000000 0.00 0.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
08/13/2019 912828WUO FED BASIS OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1768.00 UNITS 0.0000 0.000000 0.00 1,768.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
08/13/2019 912828WUO PAR VALUE OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1768.0000 UNITS 1,768.0000 0.000000 0.00 0.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
08/13/2019 912828WUO STATE COST OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1768.00 UNITS 0.0000 0.000000 0.00 0.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
08/14/2019 3133EKWV4 PAID ACCRUED INTEREST ON PURCHASE OF F F C B DEB 1.850% 7/26/24 0.0000 0.000000 -4,625.00 0.00 0.00
08/14/2019 31846V567 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -5,052,905.0000 1.000000 5,052,905.00 -5,052,905.00 0.00
08/15/2019 02587AAJ3 INTEREST EARNED ON AMERICAN EXPRESS 1.930% 9/15/22$1 PV ON 10084.2400 0.0000 0.000000 10,084.24 0.00 0.00
SHARES DUE 8/15/2019$0.00161/PV ON 6,270,000.00 PV DUE 8/15/19
08/15/2019 02665WAH4 INTEREST EARNED ON AMERICAN HONDA MTN 2.250% 8/15/19$1 PV ON 0.0000 0.000000 22,241.25 0.00 0.00
1977000.0000 SHARES DUE 8/15/2019 INTEREST ON 8/15/19 MATURITY
08/15/2019 02665WAH4 INTEREST EARNED ON AMERICAN HONDA MTN 2.250% 8/15/19$1 PV ON 0.0000 0.000000 28,125.00 0.00 0.00
2500000.0000 SHARES DUE 8/15/2019 INTEREST ON 8/15/19 MATURITY
08/15/2019 31348SWZ3 INTEREST EARNED ON F H L M C#786064 4.677% 1/01/28$1 PV ON 7.3000 SHARES 0.0000 0.000000 7.30 0.00 0.00
DUE 8/15/2019 JUNE FHLMC DUE 8/15/19
08/15/2019 3133TCE95 INTEREST EARNED ON F H L M C MLTCL MTG 4.016% 8/15/32$1 PV ON 28.7500 0.0000 0.000000 28.75 0.00 0.00
SHARES DUE 8/15/2019$0.00335/PV ON 8,682.30 PV DUE 8/15/19
08/15/2019 47788NADO INTEREST EARNED ON JOHN DEERE OWNER 1.490% 5/15/23$1 PV ON 1429.1600 0.0000 0.000000 1,429.16 0.00 0.00
SHARES DUE 8/15/2019$0.00124/PV ON 1,151,000.00 PV DUE 8/15/19
08/15/2019 47788BAD6 INTEREST EARNED ON JOHN DEERE OWNER 1.820% 10/15/21 $1 PV ON 782.1200 0.0000 0.000000 782.12 0.00 0.00
SHARES DUE 8/15/2019$0.00152/PV ON 515,683.75 PV DUE 8/15/19
08/15/2019 47788CAB8 INTEREST EARNED ON JOHN DEERE OWNER 2.420% 10/15/20$1 PV ON 952.7400 0.0000 0.000000 952.74 0.00 0.00
SHARES DUE 8/15/2019$0.00202/PV ON 472,434.77 PV DUE 8/15/19
08/15/2019 47788CAC6 INTEREST EARNED ON JOHN DEERE OWNER 2.660% 4/18/22$1 PV ON 2970.3300 0.0000 0.000000 2,970.33 0.00 0.00
SHARES DUE 8/15/2019$0.00222/PV ON 1,340,000.00 PV DUE 8/15/19
4 of 7
U.S. Bank
Transaction History
August 2019
Entry Date CUSIP Id Explanation Units Price Net Cash Amt Cost Gain/Loss
08/15/2019 47789JAB2 INTEREST EARNED ON JOHN DEERE OWNER 2.850% 12/15/21 $1 PV ON 7754.3800 0.0000 0.000000 7,754.38 0.00 0.00
SHARES DUE 8/15/2019$0.00238/PV ON 3,265,000.00 PV DUE 8/15/19
08/15/2019 47788EAC2 INTEREST EARNED ON JOHN DEERE OWNER 3.080% 11/15/22$1 PV ON 11883.6700 0.0000 0.000000 11,883.67 0.00 0.00
SHARES DUE 8/15/2019$0.00257/PV ON 4,630,000.00 PV DUE 8/15/19
08/15/2019 65478VAD9 INTEREST EARNED ON NISSAN AUTO 1.320% 1/15/21 $1 PV ON 460.3100 0.0000 0.000000 460.31 0.00 0.00
SHARES DUE 8/15/2019$0.00110/PV ON 418,464.94 PV DUE 8/15/19
08/15/2019 65478GAD2 INTEREST EARNED ON NISSAN AUTO 1.750% 10/15/21 $1 PV ON 3575.0800 0.0000 0.000000 3,575.08 0.00 0.00
SHARES DUE 8/15/2019$0.00146/PV ON 2,451,482.54 PV DUE 8/15/19
08/15/2019 65479GAD1 INTEREST EARNED ON NISSAN AUTO 3.060% 3/15/23$1 PV ON 9078.0000 0.0000 0.000000 9,078.00 0.00 0.00
SHARES DUE 8/15/2019$0.00255/PV ON 3,560,000.00 PV DUE 8/15/19
08/15/2019 89238BAB8 INTEREST EARNED ON TOYOTA AUTO 2.100% 10/15/20$1 PV ON 2434.4300 0.0000 0.000000 2,434.43 0.00 0.00
SHARES DUE 8/15/2019$0.00175/PV ON 1,391,106.63 PV DUE 8/15/19
08/15/2019 89239AAB9 INTEREST EARNED ON TOYOTA AUTO 2.830% 10/15/21 $1 PV ON 8525.3700 0.0000 0.000000 8,525.37 0.00 0.00
SHARES DUE 8/15/2019$0.00236/PV ON 3,615,000.00 PV DUE 8/15/19
08/15/2019 369550BA5 PAID ACCRUED INTEREST ON PURCHASE OF GENERAL DYNAMICS 2.875% 5/11/20 0.0000 0.000000 -15,013.89 0.00 0.00
08/15/2019 31846V567 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -49,353.8900 1.000000 49,353.89 -49,353.89 0.00
08/16/2019 3137EAEL9 INTEREST EARNED ON F H L M C M T N 2.375% 2/16/21 $1 PV ON 7500000.0000 0.0000 0.000000 89,062.50 0.00 0.00
SHARES DUE 8/16/2019
08/19/2019 3130A7CV5 INTEREST EARNED ON F H L B DEB 1.375% 2/18/21 $1 PV ON 5365000.0000 0.0000 0.000000 36,884.38 0.00 0.00
SHARES DUE 8/18/2019
08/19/2019 43814RACO INTEREST EARNED ON HONDA AUTO 1.210%12/18/20$1 PV ON 827.6200 0.0000 0.000000 827.62 0.00 0.00
SHARES DUE 8/18/2019$0.00101/PV ON 820,783.32 PV DUE 8/18/19
08/19/2019 43814PAC4 INTEREST EARNED ON HONDA AUTO 1.790% 9/20/21 $1 PV ON 3734.3500 0.0000 0.000000 3,734.35 0.00 0.00
SHARES DUE 8/18/2019$0.00149/PV ON 2,503,471.62 PV DUE 8/18/19
08/19/2019 43814WAB1 INTEREST EARNED ON HONDA AUTO 2.750% 9/20/21 $1 PV ON 10071.8800 0.0000 0.000000 10,071.88 0.00 0.00
SHARES DUE 8/18/2019$0.00229/PV ON 4,395,000.00 PV DUE 8/18/19
08/19/2019 43814UAG4 INTEREST EARNED ON HONDA AUTO 3.010% 5/18/22$1 PV ON 4289.2500 0.0000 0.000000 4,289.25 0.00 0.00
SHARES DUE 8/18/2019$0.00251/PV ON 1,710,000.00 PV DUE 8/18/19
08/19/2019 62479MVK6 INTEREST EARNED ON MUFG BANK LTD NY BRAN C P 8/19/19$1 PV ON 0.0000 0.000000 43,572.92 0.00 0.00
11125000.0000 SHARES DUE 8/19/2019 11,125,000 PAR VALUE AT 100%
08/19/2019 62479MVK6 INTEREST EARNED ON MUFG BANK LTD NY BRAN C P 8/19/19$1 PV ON 0.0000 0.000000 12,885.83 0.00 0.00
3290000.0000 SHARES DUE 8/19/2019 3,290,000 PAR VALUE AT 100%
08/19/2019 69353RFB9 INTEREST EARNED ON PNC BANK NA MTN 2.625% 2/17/22$1 PV ON 1000000.0000 0.0000 0.000000 13,125.00 0.00 0.00
SHARES DUE 8/17/2019
08/19/2019 62479MVK6 MATURED PAR VALUE OF MUFG BANK LTD NY BRAN C P 8/19/19 11,125,000 PAR -11,125,000.0000 1.000000 11,081,427.08 -11,081,427.08 0.00
VALUE AT 100%
08/19/2019 62479MVK6 MATURED PAR VALUE OF MUFG BANK LTD NY BRAN C P 8/19/19 3,290,000 PAR -3,290,000.0000 1.000000 3,277,114.17 -3,277,114.17 0.00
VALUE AT 100%
5 of 7
U.S. Bank
Transaction History
August 2019
Entry Date CUSIP Id Explanation Units Price Net Cash Amt Cost Gain/Loss
08/20/2019 36225CAZ9 INTEREST EARNED ON G N M A 1 1#080023 4.125% 12/20/26$1 PV ON 53.8900 0.0000 0.000000 53.89 0.00 0.00
SHARES DUE 8/20/2019 JULY GNMA DUE 8/20/19
08/20/2019 36225CC20 INTEREST EARNED ON G N M A 1 1#080088 3.875% 6/20/27$1 PV ON 49.8700 SHARES 0.0000 0.000000 49.87 0.00 0.00
DUE 8/20/2019 JULY GNMA DUE 8/20/19
08/20/2019 36225CNM4 INTEREST EARNED ON G N M A 1 1#080395 3.875% 4/20/30$1 PV ON 21.5400 SHARES 0.0000 0.000000 21.54 0.00 0.00
DUE 8/20/2019 JULY GNMA DUE 8/20/19
08/20/2019 36225CN28 INTEREST EARNED ON G N M A 1 1#080408 3.875% 5/20/30$1 PV ON 167.9300 0.0000 0.000000 167.93 0.00 0.00
SHARES DUE 8/20/2019 JULY GNMA DUE 8/20/19
08/20/2019 36225DCB8 INTEREST EARNED ON G N M A 1 1#080965 3.750% 7/20/34$1 PV ON 144.0200 0.0000 0.000000 144.02 0.00 0.00
SHARES DUE 8/20/2019 JULY GNMA DUE 8/20/19
08/20/2019 31846V567 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -1,850,032.4700 1.000000 1,850,032.47 -1,850,032.47 0.00
08/20/2019 31846V567 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -11,194,685.7100 1.000000 11,194,685.71 -11,194,685.71 0.00
08/21/2019 43815HAC1 INTEREST EARNED ON HONDA AUTO 2.950% 8/22/22$1 PV ON 3970000.0000 0.0000 0.000000 9,759.58 0.00 0.00
SHARES DUE 8/21/2019
08/23/2019 037833BS8 INTEREST EARNED ON APPLE INC 2.250% 2/23/21 $1 PV ON 4000000.0000 0.0000 0.000000 45,000.00 0.00 0.00
SHARES DUE 8/23/2019
08/26/2019 03215PFN4 INTEREST EARNED ON AMRESCO 6.88883% 6/25/29$1 PV ON 742.2800 0.0000 0.000000 742.28 0.00 0.00
SHARES DUE 8/25/2019$0.00574/PV ON 129,300.99 PV DUE 8/25/19
08/26/2019 06406HCZO INTEREST EARNED ON BANK OF NY MELLO MTN 2.150% 2/24/20$1 PV ON 0.0000 0.000000 16,125.00 0.00 0.00
1500000.0000 SHARES DUE 8/24/2019
08/26/2019 31398VJ98 INTEREST EARNED ON F H L M C MLTCL MTG 4.251% 1/25/20$1 PV ON 2635.0800 0.0000 0.000000 2,635.08 0.00 0.00
SHARES DUE 8/25/2019$0.00354/PV ON 743,847.19 PV DUE 8/25/19
08/26/2019 31394JY35 INTEREST EARNED ON F H L M C MLTCL MTG 6.500% 9/25/43$1 PV ON 3799.1600 0.0000 0.000000 3,799.16 0.00 0.00
SHARES DUE 8/25/2019$0.00542/PV ON 701,383.79 PV DUE 8/25/19
08/26/2019 31371 NUC7 INTEREST EARNED ON F N M A#257179 4.500% 4/01/28$1 PV ON 56.2600 SHARES 0.0000 0.000000 56.26 0.00 0.00
DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 31376KT22 INTEREST EARNED ON F N M A#357969 5.000% 9/01/35$1 PV ON 427.9400 0.0000 0.000000 427.94 0.00 0.00
SHARES DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 31381 PDA3 INTEREST EARNED ON F N M A#466397 3.400%11/01/20$1 PV ON 991.8000 0.0000 0.000000 991.80 0.00 0.00
SHARES DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 31403DJZ3 INTEREST EARNED ON F N M A#745580 5.000% 6/01/36$1 PV ON 397.1000 0.0000 0.000000 397.10 0.00 0.00
SHARES DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 31403GXF4 INTEREST EARNED ON F N M A#748678 5.000%10/01/33$1 PV ON 7.5000 SHARES 0.0000 0.000000 7.50 0.00 0.00
DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 31406PQY8 INTEREST EARNED ON F N M A#815971 5.000% 3/01/35$1 PV ON 679.4400 0.0000 0.000000 679.44 0.00 0.00
SHARES DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 31406XWT5 INTEREST EARNED ON F N M A#823358 4.722% 2/01/35$1 PV ON 433.4500 0.0000 0.000000 433.45 0.00 0.00
SHARES DUE 8/25/2019 JULY FNMA DUE 8/25/19
6 of 7
U.S. Bank
Transaction History
August 2019
Entry Date CUSIP Id Explanation Units Price Net Cash Amt Cost Gain/Loss
08/26/2019 31407BXH7 INTEREST EARNED ON F N M A#826080 5.000% 7/01/35$1 PV ON 81.5300 SHARES 0.0000 0.000000 81.53 0.00 0.00
DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 3141OF4V4 INTEREST EARNED ON F N M A#888336 5.000% 7/01/36$1 PV ON 778.5700 0.0000 0.000000 778.57 0.00 0.00
SHARES DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 3138EG6F6 INTEREST EARNED ON F N M A#AL0869 4.500% 6/01/29$1 PV ON 39.1800 SHARES 0.0000 0.000000 39.18 0.00 0.00
DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 31417YAY3 INTEREST EARNED ON F N M A#MA0022 4.500% 4/01/29$1 PV ON 63.7500 0.0000 0.000000 63.75 0.00 0.00
SHARES DUE 8/25/2019 JULY FNMA DUE 8/25/19
08/26/2019 3135GOJ20 INTEREST EARNED ON F N M A DEB 1.375% 2/26/21 $1 PV ON 10000000.0000 0.0000 0.000000 68,750.00 0.00 0.00
SHARES DUE 8/26/2019
08/26/2019 31397QREO INTEREST EARNED ON F N M A GTD REMIC 1.113% 2/25/41 $1 PV ON 478.2200 0.0000 0.000000 478.22 0.00 0.00
SHARES DUE 8/25/2019$0.00246/PV ON 194,792.45 PV DUE 8/25/19
08/27/2019 46625HKA7 INTEREST EARNED ON JPMORGAN CHASE CO 2.250% 1/23/20$1 PV ON 0.0000 0.000000 3,187.50 0.00 0.00
1500000.0000 SHARES DUE 8/26/2019$2.125 PER$1000 ACCD INT(34 DAYS)
08/27/2019 46625HKA7 INTEREST EARNED ON JPMORGAN CHASE CO 2.250% 1/23/20$1 PV ON 0.0000 0.000000 4,250.00 0.00 0.00
2000000.0000 SHARES DUE 8/26/2019$2.125 PER$1000 ACCD INT(34 DAYS)
08/27/2019 31846V567 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -3,529,752.9000 1.000000 3,529,752.90 -3,529,752.90 0.00
08/28/2019 912828WUO BOOK VALUE OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1248.00 UNITS 0.0000 0.000000 0.00 0.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
08/28/2019 912828WUO FED BASIS OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1248.00 UNITS 0.0000 0.000000 0.00 1,248.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
08/28/2019 912828UL2 PAID ACCRUED INTEREST ON PURCHASE OF U S TREASURY NT 1.375% 1/31/20 0.0000 0.000000 -5,230.98 0.00 0.00
08/28/2019 912828WUO PAR VALUE OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1248.0000 UNITS 1,248.0000 0.000000 0.00 0.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
08/28/2019 31846V567 SOLD UNITS OF FIRST AM GOVT OB FD CL Z -8,288,062.9000 1.000000 8,288,062.90 -8,288,062.90 0.00
08/28/2019 912828WUO STATE COST OF U S TREASURY I P S 0.125% 7/15/24 ADJUSTED BY 1248.00 UNITS 0.0000 0.000000 0.00 0.00 0.00
INCREASE TO ADJUST FOR CHANGE IN CPI
TOTAL OTHER TRANSACTIONS -48,404,811.8700 49,038,509.72 -48,348,353.12 0.00
7 of 7
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
BOARD OF DIRECTORS (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-594 Agenda Date: 9/25/2019 Agenda Item No: 4.
FROM: James D. Herberg, General Manager
Originator: Lorenzo Tyner, Assistant General Manager
SUBJECT:
STATUS OF EARLY LEASE TERMINATION NEGOTIATIONS
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION: Receive and file the following:
Summary of Early Lease Termination Agreements.
BACKGROUND
The Orange County Sanitation District (Sanitation District) purchased properties north of Ellis Avenue
across from the existing Plant No. 1 facilities. Some of these properties will be demolished to make
room for a new administration building for the Sanitation District. However, these buildings have
tenants, some of which have leases that expire years in the future. To facilitate the demolition of
these buildings and expediate the construction of the new administration building, the Board gave the
General Manager authority to begin negotiations with the tenants to terminate their leases early.
RELEVANT STANDARDS
• Ensure the public's money is wisely spent
PRIOR COMMITTEE/BOARD ACTIONS
May 2019 - Board of Directors provide the General Manager authority to begin negotiations with the
tenants in order to obtain early lease terminations.
ADDITONAL INFORMATION
N/A
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Summary of Early Lease Termination Agreements
Orange County Sanitation District Page 1 of 1 Printed on 9/19/2019
powered by LegistarTM
EARLY LEASE TERMINATION STATUS
Goal = Vacate Tenants by March 31, 2020
Original New
Lease Lease Termination Rent Total
Tenant End Date End Date Payment Abatement Cost Free Rent
1 Car Prep, Inc. 12/31/2020 03/31/2020 $ 127,000 $ 280,000 $ 407,000 Ten Months Free Rent Plus $127K
2 Thuan Nguyen 11/30/2022 12/31/2019 $ 25,000 $ 45,360 $ 70,360 Seven Months Free Rent Plus $25K
3 Gigamom, LLC 09/30/2022 12/31/2019 $ 25,000 $ 43,694 $ 68,694 Seven Months Free Rent Plus $25K
4 Uber Chic 12/31/2019 12/31/2019 $ 0 $ 25,920 $ 25,920 Four Months Free Rent - No Fee
5 Leadingware 04/30/2022 07/31/2019 $ 0 $ 9,960 $ 9,960 Two Months Free Rent - No Fee
6 AKH Trading 03/31/2019 03/31/2019 $ 0 $ 0 $ 0 No Free Rent and No Fee
7 Interiors 07/31/2021 10/01/2019 $ 123,871 $ 0 $ 123,871 No Free Rent but$123,871 Fees
Leave Tenants in Place
8 De La Rosa 01/31/2023 01/31/2023 $ 0 $ 0 $ 0 Space not required until late 2022
Total $ 300,871 $ 404,934 $ 705,805
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
OPERATIONS COMMITTEE (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-601 Agenda Date: 9/25/2019 Agenda Item No: 5.
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2, PROJECT NO. P2-123
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Professional Construction Services Agreement with Spec Services, Inc. to provide
construction support services for Return Activated Sludge Piping Replacement at Plant No. 2,
Project No. P2-123, for a total amount not to exceed $252,329; and
B. Approve a contingency of $25,233 (10%).
BACKGROUND
Orange County Sanitation District's (Sanitation District) Plant No. 2 has two biological secondary
treatment facilities, one of which is the Activated Sludge Plant, which uses pure oxygen for
wastewater treatment. The Activated Sludge Plant was built in 1979 and includes a concrete deck
that seals oxygen into the process basins and ninety-two light poles and fixtures installed throughout
the facility to provide operators safe working conditions at night.
RELEVANT STANDARDS
• 24/7/365 treatment plant reliability
• Comply with California Government Code Section 4256 to engage the best qualified firm "on
the basis of demonstrated competence and qualifications" and "negotiate fair and reasonable
fees"
PROBLEM
The project requires the design consultant to provide as-needed services during construction
including submittal review, answering the contractor's requests for information, reviewing construction
change orders, participating in meetings, site visits, and preparing record drawings.
PROPOSED SOLUTION
Award a Professional Construction Services Agreement with the design consultant Spec Services,
Orange County Sanitation District Page 1 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-601 Agenda Date: 9/25/2019 Agenda Item No: 5.
Inc., to provide engineering support services during construction.
TIMING CONCERNS
Engineering support services will be needed at the start of construction, which is anticipated for
October 23, 2019.
RAMIFICATIONS OF NOT TAKING ACTION
The engineering support services needed to facilitate, and review construction activities would not be
available, which may negatively impact the contract execution.
PRIOR COMMITTEE/BOARD ACTIONS
March 2018 - Approved a Professional Design Services Agreement with Spec Services, Inc. for
providing engineering services for Return Activated Sludge Piping Replacement at Plant No. 2,
Project No. P2-123, for an amount not to exceed $668,217, and approved a contingency of $66,822
(10%).
ADDITIONAL INFORMATION
Spec Services, Inc. has successfully furnished engineering services for the design of this project and
their support services during construction will provide continuity through the completion of the project.
Staff negotiated with Spec Services, Inc. for these support services in accordance with the Sanitation
District's adopted policies and procedures. A review of the proposed price was conducted using
estimated quantities of requests for information, submittals, meetings, site visits, change order
review, and design revisions, as well as the level of effort for preparing record drawings. Based on
this review, staff determined the negotiated fee to be fair and reasonable for these services.
CEQA
This project is exempt from CEQA under the Class 1 categorical exemptions set forth in California
Code of Regulations Section 15301. Section 15301 (Class 1) exempts from CEQA "the operation,
repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private
structures, facilities, mechanical equipment, or topographical features, involving negligible or no
expansion of use beyond that existing at the time of the lead agency's determination", including "(b)
Existing facilities of both investor and publicly-owned utilities used to provide electric power, natural
gas, sewerage, or other public utility services".
The project consists of minor alterations to existing public facilities.
A Notice of Exemption for this project was filed and recorded with the County of Orange on March 29,
2018 after the Board of Directors approved the Professional Design Services Agreement.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of the Sanitation District's Purchasing Ordinance. This
project has been budgeted (FY2019-20 Budget Update, Appendix A, Page A-10) and the budget is
Orange County Sanitation District Page 2 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-601 Agenda Date: 9/25/2019 Agenda Item No: 5.
sufficient to award the Professional Construction Services Agreement.
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda
package:
• Professional Construction Services Agreement
• September 4, 2019 Operations Committee Presentation
Orange County Sanitation District Page 3 of 3 Printed on 9/19/2019
powered by LegistarTM
PROFESSIONAL CONSTRUCTION SERVICES AGREEMENT
THIS AGREEMENT, is made and entered into to be effective the 25t" day of September,
2019 by and between the ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to
as "SANITATION DISTRICT", and SPEC SERVICES, Inc. for purposes of this Agreement
hereinafter referred to as "CONSULTANT".
WITNESSETH:
WHEREAS, the SANITATION DISTRICT desires to engage a CONSULTANT to provide
Construction Support Services for RETURN ACTIVATED SLUDGE PIPING REPLACEMENT
AT PLANT NO.2, PROJECT P2-123; and,
WHEREAS, CONSULTANT is qualified to provide the necessary services for
Construction Support Services in connection with these requirements; and,
WHEREAS, the SANITATION DISTRICT has adopted procedures in accordance with
the SANITATION DISTRICT's Purchasing Ordinance Section 4.03(B) for the continuation of
services and has proceeded in accordance with said procedures to perform this work; and,
WHEREAS, at its regular meeting on September 25, 2019 the Board of Directors, by
Minute Order, accepted the recommendation of the Director of Engineering and General
Manager pursuant to SANITATION DISTRICT's Purchasing Ordinance to approve this
Agreement between the SANITATION DISTRICT and CONSULTANT.
NOW, THEREFORE, in consideration of the promises and mutual benefits, which will
result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows:
1. SCOPE OF WORK
CONSULTANT agrees to furnish necessary professional and technical services to
accomplish those project elements outlined in the Scope of Work attached hereto as
"Attachment A", and by this reference made a part of this Agreement.
A. The CONSULTANT shall be responsible for the professional quality, technical
accuracy, completeness, and coordination of all design, drawings, specifications,
and other services furnished by the CONSULTANT under this Agreement,
including the work performed by its Subconsultants. Where approval by the
SANITATION DISTRICT is indicated, it is understood to be conceptual approval
only and does not relieve the CONSULTANT of responsibility for complying with
all laws, codes, industry standards and liability for damages caused by errors,
omissions, noncompliance with industry standards, and/or negligence on the part
of the CONSULTANT or its Subconsultants.
B. CONSULTANT is responsible for the quality of work prepared under this
Agreement and shall ensure that all work is performed to the standards of best
engineering practice for clarity, uniformity, and completeness.
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 1 of 19
C. In the event that work is not performed to the satisfaction of the SANITATION
DISTRICT and does not conform to the requirements of this Agreement or any
applicable industry standards, the CONSULTANT shall, without additional
compensation, promptly correct or revise any errors or deficiencies in its designs,
drawings, specifications, or other services within the timeframe specified by the
Project Engineer/Project Manager. The SANITATION DISTRICT may charge to
CONSULTANT all costs, expenses and damages associated with any such
corrections or revisions.
D. All CADD drawings, figures, and other work shall be produced by
CONSULTANTS and Subconsultants using the SANITATION DISTRICT
standard software. Conversion of CADD work from any other non-standard
CADD format to the SANITATION DISTRICT format shall not be acceptable in
lieu of this requirement.
Electronic files shall be subject to an acceptance period of thirty (30) calendar
days during which the SANITATION DISTRICT shall perform appropriate
acceptance tests. CONSULTANT shall correct any discrepancies or errors
detected and reported within the acceptance period at no additional cost to the
SANITATION DISTRICT.
E. All professional services performed by the CONSULTANT, including but not
limited to all drafts, data, correspondence, proposals, reports, and estimates
compiled or composed by the CONSULTANT, pursuant to this Agreement, are
for the sole use of the SANITATION DISTRICT, its agents and employees.
Neither the documents nor their contents shall be released to any third party
without the prior written consent of the SANITATION DISTRICT. This provision
does not apply to information that (a) was publicly known, or otherwise known to
the CONSULTANT, at the time that it was disclosed to the CONSULTANT by the
SANITATION DISTRICT, (b) subsequently becomes publicly known to the
CONSULTANT other than through disclosure by the SANITATION DISTRICT.
2. COMPENSATION
Total compensation shall be paid to CONSULTANT for services in accordance with the
following provisions:
A. Total Compensation
Total compensation shall be in an amount not to exceed Two Hundred Forty-
Eight Thousand One Hundred Thirty-Two Dollars ($248,132). Total
compensation to CONSULTANT including burdened labor (salaries plus
benefits), overhead, profit, direct costs, and Subconsultant(s)fees and costs
shall not exceed the sum set forth in Attachment "E" - Fee Proposal.
B. Labor
As a portion of the total compensation to be paid to CONSULTANT, the
SANITATION DISTRICT shall pay to CONSULTANT a sum equal to the
burdened salaries (salaries plus benefits) actually paid by CONSULTANT
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 2 of 19
charged on an hourly-rate basis to this project and paid to the personnel of
CONSULTANT. Upon request of the SANITATION DISTRICT, CONSULTANT
shall provide the SANITATION DISTRICT with certified payroll records of all
employees' work that is charged to this project.
C. Overhead
As a portion of the total compensation to be paid to CONSULTANT, the
SANITATION DISTRICT shall compensate CONSULTANT and Subconsultants
for overhead at the rate equal to the percentage of burdened labor as specified in
Attachment "E" - Fee Proposal.
D. Profit
Profit for CONSULTANT and Subconsultants shall be a percentage of consulting
services fees (Burdened Labor and Overhead). When the consulting or
subconsulting services amount is $250,000 or less, the maximum Profit shall be
10%. Between $250,000 and $2,500,000, the maximum Profit shall be limited by
a straight declining percentage between 10% and 5%. For consulting or
subconsulting services fees with a value greater than $2,500,000, the maximum
Profit shall be 5%. Addenda shall be governed by the same maximum Profit
percentage after adding consulting services fees.
As a portion of the total compensation to be paid to CONSULTANT and
Subconsultants, the SANITATION DISTRICT shall pay profit for all services
rendered by CONSULTANT and Subconsultants for this project according to
Attachment "E" - Fee Proposal.
E. Subconsultants
For any Subconsultant whose fees for services are greater than or equal to
$100,000 (excluding out-of-pocket costs), CONSULTANT shall pay to
Subconsultant total compensation in accordance with the Subconsultant amount
specified in Attachment "E" - Fee Proposal.
For any Subconsultant whose fees for services are less than $100,000,
CONSULTANT may pay to Subconsultant total compensation on an hourly-rate
basis per the attached hourly rate Schedule and as specified in the Scope of
Work. The SANITATION DISTRICT shall pay to CONSULTANT the actual costs
of Subconsultant fees and charges in an amount not to exceed the sum set forth
in Attachment "E" - Fee Proposal.
F. Direct Costs
The SANITATION DISTRICT shall pay to CONSULTANT and Subconsultants
the actual costs of permits and associated fees, travel and licenses for an
amount not to exceed the sum set forth in Attachment "E" - Fee Proposal. The
SANITATION DISTRICT shall also pay to CONSULTANT actual costs for
equipment rentals, leases or purchases with prior approval of the SANITATION
DISTRICT. Upon request, CONSULTANT shall provide to the SANITATION
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 3 of 19
DISTRICT receipts and other documentary records to support CONSULTANT's
request for reimbursement of these amounts, see Attachment "D" —Allowable
Direct Costs. All incidental expenses shall be included in overhead pursuant to
Section 2 - COMPENSATION above.
G. Other Direct Costs
Other Direct Costs incurred by CONSULTANT and its Contractor due to
modifications in scope of work resulting from field investigations and field work
required by Contract. These items may include special equipment, test
equipment and tooling and other materials and services not previously identified.
Refer to attachment "D" Allowable Direct Costs for payment information.
H. Reimbursable Direct Costs
The SANITATION DISTRICT will reimburse the CONSULTANT for reasonable
travel and business expenses as described in this section and further described in
Attachment "D" - Allowable Direct Costs to this Agreement. The reimbursement of
the above-mentioned expenses will be based on an "accountable plan" as
considered by Internal Revenue Service (IRS). The plan includes a combination of
reimbursements based upon receipts and a "per diem" component approved by
IRS. The most recent schedule of the per diem rates utilized by the SANITATION
DISTRICT can be found on the U.S. General Service Administration website at
http://www.gsa.gov/portal/category/l 04711#.
The CONSULTANT shall be responsible for the most economical and practical
means of management of reimbursable costs inclusive but not limited to travel,
lodging and meals arrangements. The SANITATION DISTRICT shall apply the
most economic and practical method of reimbursement which may include
reimbursements based upon receipts and/or"per diem" as deemed the most
practical.
CONSULTANT shall be responsible for returning to the SANITATION DISTRICT
any excess reimbursements after the reimbursement has been paid by the
SANITATION DISTRICT.
Travel and travel arrangements —Any travel involving airfare, overnight stays or
multiple day attendance must be approved by the SANITATION DISTRICT in
advance.
Local Travel is considered travel by the CONSULTANT within the SANITATION
DISTRICT general geographical area which includes Orange, Los Angeles,
Ventura, San Bernardino, Riverside, San Diego, Imperial and Kern Counties.
Automobile mileage is reimbursable if CONSULTANT is required to utilize
personal vehicle for local travel.
Lodging — Overnight stays will not be approved by the SANITATION DISTRICT for
local travel. However, under certain circumstances overnight stay may be allowed
at the discretion of the SANITATION DISTRICT based on reasonableness of
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 4 of 19
meeting schedules and the amount of time required for travel by the
CONSULTANT. Such determination will be made on a case-by-case basis and at
the discretion of the SANITATION DISTRICT.
Travel Meals — Per-diem rates as approved by IRS shall be utilized for travel
meals reimbursements. Per diem rates shall be applied to meals that are
appropriate for travel times. Receipts are not required for the approved meals.
Additional details related to the reimbursement of the allowable direct costs are
provided in the Attachment "D" -Allowable Direct Costs of this Agreement.
I. Limitation of Costs
If, at any time, CONSULTANT estimates the cost of performing the services
described in CONSULTANT's Proposal will exceed the not-to-exceed amount of
the Agreement, including approved additional compensation, CONSULTANT
shall notify the SANITATION DISTRICT immediately, and in writing. This written
notice shall indicate the additional amount necessary to complete the services.
Any cost incurred in excess of the approved not-to-exceed amount, without the
express written consent of the SANITATION DISTRICT's authorized
representative shall be at CONSULTANT's own risk. This written notice shall be
provided separately from, and in addition to any notification requirements
contained in the CONSULTANT's invoice and monthly progress report. Failure to
notify the SANITATION DISTRICT that the services cannot be completed within
the authorized not-to-exceed amount is a material breach of this Agreement.
3. REALLOCATION OF TOTAL COMPENSATION
The SANITATION DISTRICT, by its Director of Engineering, shall have the right to
approve a reallocation of the incremental amounts constituting the total compensation,
provided that the total compensation is not increased.
4. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed
breakdown of costs associated with the performance of any corrections or
revisions of the work for that invoicing period. CONSULTANT shall allocate costs
in the same manner as it would for payment requests as described in this Section
of the Agreement. CONSULTANT shall warrant and certify the accuracy of these
costs and understand that submitted costs are subject to Section 11 -AUDIT
PROVISIONS.
B. CONSULTANT may submit monthly or periodic statements requesting payment
for those items included in Section 2 - COMPENSATION hereof in the format as
required by the SANITATION DISTRICT. Such requests shall be based upon the
amount and value of the work and services performed by CONSULTANT under
this Agreement and shall be prepared by CONSULTANT and accompanied by
such supporting data, including a detailed breakdown of all costs incurred and
project element work performed during the period covered by the statement, as
may be required by the SANITATION DISTRICT.
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 5 of 19
Upon approval of such payment request by the SANITATION DISTRICT,
payment shall be made to CONSULTANT as soon as practicable of one hundred
percent (100%) of the invoiced amount on a per-project-element basis.
If the SANITATION DISTRICT determines that the work under this Agreement or
any specified project element hereunder, is incomplete and that the amount of
payment is in excess of:
i. The amount considered by the SANITATION DISTRICT's Director of
Engineering to be adequate for the protection of the SANITATION DISTRICT; or
ii. The percentage of the work accomplished for each project element.
He may, at his discretion, retain an amount equal to that which insures that the
total amount paid to that date does not exceed the percentage of the completed
work for each project element or the project in its entirety.
C. CONSULTANT may submit periodic payment requests for each 30-day period of
this Agreement for the profit as set forth in Section 2 - COMPENSATION above.
Said profit payment request shall be proportionate to the work actually
accomplished to date on a per-project-element basis. In the event the
SANITATION DISTRICT's Director of Engineering determines that no satisfactory
progress has been made since the prior payment, or in the event of a delay in the
work progress for any reason, the SANITATION DISTRICT shall have the right to
withhold any scheduled proportionate profit payment.
D. Upon satisfactory completion by CONSULTANT of the work called for under the
terms of this Agreement, and upon acceptance of such work by the SANITATION
DISTRICT, CONSULTANT will be paid the unpaid balance of any money due for
such work, including any retained percentages relating to this portion of the work.
E. Upon satisfactory completion of the work performed hereunder and prior to final
payment under this Agreement for such work, or prior settlement upon
termination of this Agreement, and as a condition precedent thereto,
CONSULTANT shall execute and deliver to the SANITATION DISTRICT a
release of all claims against the SANITATION DISTRICT arising under or by
virtue of this Agreement other than such claims, if any, as may be specifically
exempted by CONSULTANT from the operation of the release in stated amounts
to be set forth therein.
F. Pursuant to the California False Claims Act (Government Code Sections 12650-
12655), any CONSULTANT that knowingly submits a false claim to the
SANITATION DISTRICT for compensation under the terms of this Agreement
may be held liable for treble damages and up to a ten thousand dollars ($10,000)
civil penalty for each false claim submitted. This Section shall also be binding on
all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false
claim when the CONSULTANT or Subconsultant: a) knowingly presents or
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 6 of 19
causes to be presented to an officer or employee of the SANITATION DISTRICT
a false claim or request for payment or approval; b) knowingly makes, uses, or
causes to be made or used a false record or statement to get a false claim paid
or approved by the SANITATION DISTRICT; c) conspires to defraud the
SANITATION DISTRICT by getting a false claim allowed or paid by the
SANITATION DISTRICT; d) knowingly makes, uses, or causes to be made or
used a false record or statement to conceal, avoid, or decrease an obligation to
the SANITATION DISTRICT; or e) is a beneficiary of an inadvertent submission
of a false claim to the SANITATION DISTRICT, and fails to disclose the false
claim to the SANITATION DISTRICT within a reasonable time after discovery of
the false claim.
5. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION
AND RECORD OF WAGES
A. To the extent CONSULTANT's employees and/or Subconsultants who will
perform Work during the design and preconstruction phases of a construction
contract for which Prevailing Wage Determinations have been issued by the DIR
and as more specifically defined under Labor Code Section 1720 et seq,
CONSULTANT and Subconsultants shall comply with the registration
requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section
1771.4, the Work is subject to compliance monitoring and enforcement by the
DIR.
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records
and shall comply with all the provisions of Labor Code Section 1776, and shall
submit payroll records to the Labor Commissioner pursuant to Labor Code
Section 1771.4(a) (3). Penalties for non-compliance with the requirements of
Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants
shall furnish a copy of all certified payroll records to SANITATION DISTRICT
and/or general public upon request, provided the public request is made through
SANITATION DISTRICT, the Division of Apprenticeship Standards or the
Division of Labor Enforcement of the Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices
posting requirements established by the Labor Commissioner per Title 8,
California Code of Regulation Section 16461(e).
6. DOCUMENT OWNERSHIP — SUBSEQUENT CHANGES TO PLANS AND
SPECIFICATIONS
A. Ownership of Documents for the Professional Services performed.
All documents, including but not limited to, original plans, studies, sketches,
drawings, computer printouts and disk files, and specifications prepared in
connection with or related to the Scope of Work or Professional Services, shall
be the property of the SANITATION DISTRICT. The SANITATION DISTRICT's
ownership of these documents includes use of, reproduction or reuse of and all
incidental rights, whether or not the work for which they were prepared has been
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 7 of 19
performed. The SANITATION DISTRICT ownership entitlement arises upon
payment or any partial payment for work performed and includes ownership of
any and all work product completed prior to that payment. This Section shall
apply whether the CONSULTANT's Professional Services are terminated: a) by
the completion of the Agreement, or b) in accordance with other provisions of this
Agreement. Notwithstanding any other provision of this paragraph or Agreement,
the CONSULTANT shall have the right to make copies of all such plans, studies,
sketches, drawings, computer printouts and disk files, and specifications.
B. CONSULTANT shall not be responsible for damage caused by subsequent
changes to or uses of the plans or specifications, where the subsequent changes
or uses are not authorized or approved by CONSULTANT, provided that the
service rendered by CONSULTANT was not a proximate cause of the damage.
7. INSURANCE
A. General
i. Insurance shall be issued and underwritten by insurance companies
acceptable to the SANITATION DISTRICT.
ii. Insurers must have an "A-" Policyholder's Rating, or better, and Financial
Rating of at least Class Vill, or better, in accordance with the most current
A.M. Best's Guide Rating. However, the SANITATION DISTRICT will accept
State Compensation Insurance Fund, for the required policy of Worker's
Compensation Insurance subject to the SANITATION DISTRICT's option to
require a change in insurer in the event the State Fund financial rating is
decreased below "B". Further, the SANITATION DISTRICT will require
CONSULTANT to substitute any insurer whose rating drops below the levels
herein specified. Said substitution shall occur within twenty (20) days of
written notice to CONSULTANT, by the SANITATION DISTRICT or its agent.
iii. Coverage shall be in effect prior to the commencement of any work under
this Agreement.
B. General Liability
The CONSULTANT shall maintain during the life of this Agreement, including the
period of warranty, Commercial General Liability Insurance written on an
occurrence basis providing the following minimum limits of liability coverage: One
Million Dollars ($1,000,000) per occurrence with One Million Dollars ($1,000,000)
aggregate. Said insurance shall include coverage for the following hazards:
Premises-Operations, products liability/completed operations (including any
product manufactured or assembled), broad form property damage, blanket
contractual liability, independent contractors liability, personal and advertising
injury, mobile equipment, owners and contractors protective liability, and cross
liability and severability of interest clauses. A statement on an insurance
certificate will not be accepted in lieu of the actual additional insured
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 8 of 19
endorsement(s). If requested by SANITATION DISTRICT and applicable, XCU
coverage (Explosion, Collapse and Underground) and Riggers/On Hook Liability
must be included in the General Liability policy and coverage must be reflected
on the submitted Certificate of Insurance.
C. Umbrella Excess Liability
The minimum limits of general liability and Automotive Liability Insurance
required, as set forth herein, shall be provided for through either a single policy of
primary insurance or a combination of policies of primary and umbrella excess
coverage. Umbrella excess liability coverage shall be issued with limits of liability
which, when combined with the primary insurance, will equal the minimum limits
for general liability and automotive liability.
D. Automotive/Vehicle liability Insurance
The CONSULTANT shall maintain a policy of Automotive Liability Insurance on a
comprehensive form covering all owned, non-owned, and hired automobiles,
trucks, and other vehicles providing the following minimum limits of liability
coverage: Combined single limit of One Million Dollars ($1,000,000) or
alternatively, One Million Dollars ($1,000,000) per person for bodily injury and
One Million Dollars ($1,000,000) per accident for property damage. A statement
on an insurance certificate will not be accepted in lieu of the actual additional
insured endorsement.
E. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by
CONSULTANT in the amount of one million dollars ($1,000,000) in form
acceptable to the SANITATION DISTRICT.
F. Worker's Compensation Insurance
The CONSULTANT shall provide such Workers' Compensation Insurance as
required by the Labor Code of the State of California in the amount of the
statutory limit, including Employer's Liability Insurance with a minimum limit of
One Million Dollars ($1,000,000) per occurrence. Such Worker's Compensation
Insurance shall be endorsed to provide for a waiver of subrogation in favor of the
SANITATION DISTRICT. A statement on an insurance certificate will not be
accepted in lieu of the actual endorsements unless the insurance carrier is State
of California Insurance Fund and the identifier"SCIF" and endorsement numbers
2570 and 2065 are referenced on the certificate of insurance. If an exposure to
Jones Act liability may exist, the insurance required herein shall include coverage
for Jones Act claims.
G. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this
Agreement, standard industry form professional negligence errors and omissions
insurance coverage in an amount of not less than Two Million Dollars
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 9 of 19
($2,000,000) with limits in accordance with the provisions of this Paragraph. If
the policy of insurance is written on a "claims made" basis, said policy shall be
continued in full force and effect at all times during the term of this Agreement,
and for a period of five (5) years from the date of the completion of the services
hereunder.
In the event of termination of said policy during this period, CONSULTANT shall
obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the term of this
Agreement. Said coverage shall be evidenced by either a new policy evidencing
no gap in coverage or by separate extended "tail" coverage with the present or
new carrier.
In the event the present policy of insurance is written on an "occurrence" basis,
said policy shall be continued in full force and effect during the term of this
Agreement or until completion of the services provided for in this Agreement,
whichever is later. In the event of termination of said policy during this period,
new coverage shall be obtained for the required period to insure for the prior acts
of CONSULTANT during the course of performing services under the term of this
Agreement.
CONSULTANT shall provide to the SANITATION DISTRICT a certificate of
insurance in a form acceptable to the SANITATION DISTRICT indicating the
deductible or self-retention amounts and the expiration date of said policy, and
shall provide renewal certificates not less than ten (10) days prior to the
expiration of each policy term.
H. Proof of Coverage
The CONSULTANT shall furnish the SANITATION DISTRICT with original
certificates and amendatory endorsements effecting coverage. Said policies and
endorsements shall conform to the requirements herein stated. All certificates
and endorsements are to be received and approved by the SANITATION
DISTRICT before work commences. The SANITATION DISTRICT reserves the
right to require complete, certified copies of all required insurance policies,
including endorsements, effecting the coverage required, at any time. The
following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25 (5/2010) or equivalent.
• Additional Insurance (ISO Form) CG2010 11 85 or
(General Liability)
The combination of (ISO Forms)
CG 2010 1001 and CG 2037 1001
All other Additional Insured endorsements must
be submitted for approval by the SANITATION
DISTRICT, and the SANITATION DISTRICT
may reject alternatives that provide different or
less coverage to the SANITATION DISTRICT.
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 10 of 19
• Additional Insured Submit endorsement provided by carrier for the
(Auto Liability) SANITATION DISTRICT approval.
• Waiver of Subrogation State Compensation Insurance Fund
Endorsement No. 2570 or equivalent.
• Cancellation Notice State Compensation Insurance Fund
Endorsement No. 2065 or equivalent.
I. Cancellation Notice
Each insurance policy required herein shall be endorsed to state that coverage
shall not be cancelled by either party, except after thirty (30) days' prior written
notice. The Cancellation Section of ACORD Form 25 (5/2010) shall state the
required thirty (30) days' written notification. The policy shall not terminate, nor
shall it be cancelled, nor the coverage reduced until thirty (30) days after written
notice is given to the SANITATION DISTRICT except for nonpayment of
premium, which shall require not less than ten (10) days written notice to the
SANITATION DISTRICT. Should there be changes in coverage or an increase in
deductible or SIR amounts, the CONSULTANT and its insurance broker/agent
shall send to the SANITATION DISTRICT a certified letter which includes a
description of the changes in coverage and/or any increase in deductible or SIR
amounts. The certified letter must be sent to the attention of Risk Management,
and shall be received by the SANITATION DISTRICT not less than thirty (30)
days prior to the effective date of the change(s) if the change would reduce
coverage or increase deductibles or SIR amounts or otherwise reduce or limit the
scope of insurance coverage provided to the SANITATION DISTRICT.
J. Primary Insurance
All liability policies shall contain a Primary and Non-Contributory Clause. Any
other insurance maintained by the SANITATION DISTRICT shall be excess and
not contributing with the insurance provided by CONSULTANT.
K. Separation of Insured
All liability policies shall contain a "Separation of Insureds" clause.
L. Non-Limiting (if applicable)
Nothing in this document shall be construed as limiting in any way, nor shall it
limit the indemnification provision contained in this Agreement, or the extent to
which CONSULTANT may be held responsible for payment of damages to
persons or property.
M. Deductibles and Self-Insured Retentions
Any deductible and/or self-insured retention must be declared to the
SANITATION DISTRICT on the Certificate of Insurance. All deductibles and/or
self-insured retentions require approval by the SANITATION DISTRICT. At the
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 11 of 19
option of the SANITATION DISTRICT, either: the insurer shall reduce or
eliminate such deductible or self-insured retention as respects the SANITATION
DISTRICT; or the CONSULTANT shall provide a financial guarantee satisfactory
to the SANITATION DISTRICT guaranteeing payment of losses and related
investigations, claim administration and defense expenses.
N. Defense Costs
Liability policies, with the exception of Professional Liability, shall have a
provision that defense costs for all insureds and additional insureds are paid in
addition to and do not deplete any policy limits.
O. Subconsultants
The CONSULTANT shall be responsible to establish insurance requirements for
any Subconsultant hired by the CONSULTANT. The insurance shall be in
amounts and types reasonably sufficient to deal with the risk of loss involving the
Subconsultant's operations and work.
P. Limits Are Minimums
If the CONSULTANT maintains higher limits than any minimums shown above,
then SANITATION DISTRICT requires and shall be entitled to coverage for the
higher limits maintained by CONSULTANT.
8. SCOPE CHANGES
In the event of a change in the Scope of Work, requested by SANITATION DISTRICT,
the parties hereto shall execute an amendment to this Agreement setting forth with
particularity all terms of the new Agreement, including but not limited to any additional
CONSULTANT's fees.
9. PROJECT TEAM AND SUBCONSULTANTS
CONSULTANT shall provide to SANITATION DISTRICT, prior to execution of this
Agreement, the names and full description of all Subconsultants and CONSULTANT's
project team members anticipated to be used on this project by CONSULTANT.
CONSULTANT shall include a description of the scope of work to be done by each
Subconsultant and each CONSULTANT's project team member. CONSULTANT shall
include the respective compensation amounts for CONSULTANT and each
Subconsultant on a per-project-element basis, broken down as indicated in Section 2 -
COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT's project
team members without prior written approval by the SANITATION DISTRICT.
10. ENGINEERING REGISTRATION
The CONSULTANT's personnel are comprised of registered engineers and a staff of
specialists and draftsmen in each department. The firm itself is not a registered
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 12 of 19
engineer but represents and agrees that wherever in the performance of this Agreement
requires the services of a registered engineer, such services hereunder will be
performed under the direct supervision of registered engineers.
11. AUDIT PROVISIONS
A. SANITATION DISTRICT retains the reasonable right to access, review, examine,
and audit, any and all books, records, documents and any other evidence of
procedures and practices that the SANITATION DISTRICT determines are
necessary to discover and verify that the CONSULTANT is in compliance with all
requirements under this Agreement. The CONSULTANT shall include the
SANITATION DISTRICT's right as described above, in any and all of their
subcontracts, and shall ensure that these rights are binding upon all Subconsultants.
B. SANITATION DISTRICT retains the right to examine CONSULTANT's books,
records, documents and any other evidence of procedures and practices that the
SANITATION DISTRICT determines are necessary to discover and verify all
direct and indirect costs, of whatever nature, which are claimed to have been
incurred, or anticipated to be incurred or to ensure CONSULTANT's compliance
with all requirements under this Agreement during the term of this Agreement
and for a period of three (3) years after its termination.
C. CONSULTANT shall maintain complete and accurate records in accordance with
generally accepted industry standard practices and the SANITATION
DISTRICT's policy. The CONSULTANT shall make available to the
SANITATION DISTRICT for review and audit, all project related accounting
records and documents, and any other financial data within 15 days after receipt
of notice from the SANITATION DISTRICT. Upon SANITATION DISTRICT's
request, the CONSULTANT shall submit exact duplicates of originals of all
requested records to the SANITATION DISTRICT. If an audit is performed,
CONSULTANT shall ensure that a qualified employee of the CONSULTANT will
be available to assist SANITATION DISTRICT's auditor in obtaining all project
related accounting records and documents, and any other financial data.
12. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the parties hereto is that of an independent contractor
and nothing herein shall be deemed to make CONSULTANT an employee of the
SANITATION DISTRICT.
13. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of
this Agreement, or changes thereto, shall be effected by delivery of said notices in
person or by depositing said notices in the U.S. mail, registered or certified mail, return
receipt requested, postage prepaid.
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 13 of 19
Notices shall be mailed to the SANITATION DISTRICT at:
ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
Attention: Jay Kaura, Contracts Administrator
Copy: Richard Leon, Project Manager
Notices shall be mailed to CONSULTANT at:
SPEC SERVICES, Inc.
10540 Talbert Ave., Suite 100 East
Fountain Valley, CA 92708
Attention: Kim Henry, PE
President/CEO
All communication regarding the Scope of Work, will be addressed to the Project Manager.
Direction from other SANITATION DISTRICT's staff must be approved in writing by the
SANITATION DISTRICT's Project Manager prior to action from the CONSULTANT.
14. TERMINATION
The SANITATION DISTRICT may terminate this Agreement at any time, without cause,
upon giving thirty (30) days written notice to CONSULTANT. In the event of such
termination, CONSULTANT shall be entitled to compensation for work performed on a
prorated basis through and including the effective date of termination.
CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days
written notice only if CONSULTANT is not compensated for billed amounts in
accordance with the provisions of this Agreement, when the same are due.
Notice of termination shall be mailed to the SANITATION DISTRICT and/or
CONSULTANT in accordance with Section 13 - NOTICES.
15. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this project shall become the property of the
SANITATION DISTRICT upon the termination or completion of the work. CONSULTANT
agrees to furnish to the SANITATION DISTRICT copies of all memoranda,
correspondence, computation and study materials in its files pertaining to the work
described in this Agreement, which is requested in writing by the SANITATION DISTRICT.
16. COMPLIANCE
A. Labor
CONSULTANT certifies by the execution of this Agreement that it pays
employees not less than the minimum wage as defined by law, and that it does
not discriminate in its employment with regard to race, color, religion, sex or
national origin; that it is in compliance with all federal, state and local directives
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 14 of 19
and executive orders regarding non-discrimination in employment; and that it
agrees to demonstrate positively and aggressively the principle of equal
opportunity in employment.
B. Air Pollution
CONSULTANT and its subconsultants and subcontractors shall comply with all
applicable federal, state and local air pollution control laws and regulations.
17. AGREEMENT EXECUTION AUTHORIZATION
Both the SANITATION DISTRICT and CONSULTANT do covenant that each individual
executing this document by and on behalf of each party is a person duly authorized to
execute agreements for that party.
18. DISPUTE RESOLUTION
In the event of a dispute arising between the parties regarding performance or
interpretation of this Agreement, the dispute shall be resolved by binding arbitration
under the auspices of the Judicial Arbitration and Mediation Service ("JAMS"), or similar
organization or entity conducting alternate dispute resolution services.
19. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute
Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the
prevailing party shall be entitled to reasonable attorney's fees, costs and necessary
disbursements in addition to any other relief to which it may be entitled.
20. PROGRESS REPORTS
Monthly progress reports shall be submitted for review by the tenth day of the following
month and must include as a minimum: 1) current activities, 2) future activities, 3)
potential items that are not included in the Scope of Work, 4) concerns and possible
delays, 5) percentage of completion, and 6) budget status.
21. WARRANTY
CONSULTANT shall perform its services in accordance with generally accepted industry
and professional standards. If, within the 12-month period following completion of its
services, the SANITATION DISTRICT informs CONSULTANT that any part of the
services fails to meet those standards, CONSULTANT shall, within the time prescribed
by the SANITATION DISTRICT, take all such actions as are necessary to correct or
complete the noted deficiency(ies).
22. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at
CONSULTANT's sole cost and expense and with legal counsel approved by the
SANITATION DISTRICT, which approval shall not be unreasonably withheld), protect
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 15 of 19
and hold harmless the SANITATION DISTRICT and all of SANITATION DISTRICT's
officers, directors, employees, consultants, and agents (collectively the "Indemnified
Parties"), from and against any and all claims, damages, liabilities, causes of action,
suits, arbitration awards, losses,judgments, fines, penalties, costs and expenses
including without limitation, attorneys' fees, disbursements and court costs, and all other
professional, expert or consultants fees and costs and the SANITATION DISTRICT's
general and administrative expenses (individually, a "Claim", or collectively, "Claims")
which may arise from or are in any manner related, directly or indirectly, to any work
performed, or any operations, activities, or services provided by CONSULTANT in
carrying out its obligations under this Agreement to the extent of the negligent,
recklessness and/or willful misconduct of CONSULTANT, its principals, officers, agents,
employees, CONSULTANT's suppliers, consultants, subconsultants, subcontractors,
and/or anyone employed directly or indirectly by any of them, regardless of any
contributing negligence or strict liability of an Indemnified Party. Notwithstanding the
foregoing, nothing herein shall be construed to require CONSULTANT to indemnify the
Indemnified Parties from any Claim arising from:
(A) the sole or active negligence or willful misconduct of the Indemnified Parties; or
(B) a natural disaster or other act of God, such as an earthquake; or
(C) the independent action of a third party who is neither one of the Indemnified Parties
nor the CONSULTANT, nor its principal, officer, agent, employee, nor
CONSULTANT's supplier, consultant, subconsultant, subcontractor, nor anyone
employed directly or indirectly by any of them.
Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest
extent permitted by law, indemnify the Indemnified Parties, from Claims arising from
more than one cause if any such cause taken alone would otherwise result in the
obligation to indemnify hereunder.
CONSULTANT's liability for indemnification hereunder is in addition to any liability
CONSULTANT may have to the SANITATION DISTRICT for a breach by
CONSULTANT of any of the provisions of this Agreement. Under no circumstances
shall the insurance requirements and limits set forth in this Agreement be construed to
limit CONSULTANT's indemnification obligation or other liability hereunder.
The terms of this Agreement are contractual and the result of negotiation between the
parties hereto. Accordingly, any rule of construction of contracts (including, without
limitation, California Civil Code Section 1654) that ambiguities are to be construed
against the drafting party, shall not be employed in the interpretation of this Agreement.
23. DUTY TO DEFEND
The duty to defend hereunder is wholly independent of and separate from the duty to
indemnify and such duty to defend shall exist regardless of any ultimate liability of
CONSULTANT and shall be consistent with Civil Code Section 2782.8. Such defense
obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to
indemnify one or more Indemnified Parties, and upon written notice of such Claim being
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 16 of 19
provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the
payment or advance of defense costs by any Indemnified Party shall not be a condition
precedent to enforcing such Indemnified Party's rights to indemnification hereunder. In
the event a final judgment, arbitration, award, order, settlement, or other final resolution
expressly determines that the claim did not arise out of, pertain to, or relate to the
negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent,
then the DISTRICT will reimburse CONSULTANT for the reasonable costs of defending
the Indemnified Parties against such claims.
CONSULTANT's indemnification obligation hereunder shall survive the expiration or
earlier termination of this Agreement until such time as action against the Indemnified
Parties for such matter indemnified hereunder is fully and finally barred by the applicable
statute of limitations.
24. CONSULTANT PERFORMANCE
The CONSULTANT's performance shall be evaluated by the SANITATION DISTRICT.
A copy of the evaluation shall be sent to the CONSULTANT for comment. The
evaluation, together with the comments, shall be retained by the SANITATION
DISTRICT and may be considered in future CONSULTANT selection processes.
25. COMPLIANCE WITH SANITATION DISTRICT POLICIES AND PROCEDURES
CONSULTANT shall comply with all SANITATION DISTRICT policies and procedures
including the OCSD Safety Standards, as applicable, all of which may be amended from
time to time.
26. CLOSEOUT
When the SANITATION DISTRICT determines that all Work authorized under the
Agreement is fully complete and that the SANITATION DISTRICT requires no further
work from CONSULTANT, or the Agreement is otherwise terminated or expires in
accordance with the terms of the Agreement, the SANITATION DISTRICT shall give the
Consultant written notice that the Agreement will be closed out. CONSULTANT shall
submit all outstanding billings, work submittals, deliverables, reports or similarly related
documents as required under the Agreement within thirty (30) days of receipt of notice of
Agreement closeout.
Upon receipt of CONSULTANT's submittals, the SANITATION DISTRICT shall
commence a closeout audit of the Agreement and will either:
i. Give the CONSULTANT a final Agreement Acceptance: or
ii. Advise the CONSULTANT in writing of any outstanding item or items which must be
furnished, completed, or corrected at the CONSULTANT's cost.
CONSULTANT shall be required to provide adequate resources to fully support any
administrative closeout efforts identified in this Agreement. Such support must be
provided within the timeframe requested by the SANITATION DISTRICT.
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 17 of 19
Notwithstanding the final Agreement Acceptance the CONSULTANT will not be relieved
of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to
complete any portions of the work, the non-completion of which were not disclosed to
the SANITATION DISTRICT (regardless of whether such nondisclosures were
fraudulent, negligent, or otherwise); and the CONSULTANT shall remain obligated under
all those provisions of the Agreement which expressly or by their nature extend beyond
and survive final Agreement Acceptance.
Any failure by the SANITATION DISTRICT to reject the work or to reject the
CONSULTANT's request for final Agreement Acceptance as set forth above shall not be
deemed to be acceptance of the work by the SANITATION DISTRICT for any purpose
nor imply acceptance of, or agreement with, the CONSULTANT's request for final
Agreement Acceptance.
27. ENTIRE AGREEMENT
This Agreement constitutes the entire understanding and agreement between the
Parties and supersedes all previous negotiations between them pertaining to the subject
matter thereof.
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 18 of 19
IN WITNESS WHEREOF, this Agreement has been executed in the name of the SANITATION
DISTRICT, by its officers thereunto duly authorized, and CONSULTANT as of the day and year
first above written.
CONSULTANT: SPEC SERVICES, INC.
By
Date
Printed Name & Title
ORANGE COUNTY SANITATION DISTRICT
By
David John Shawver Date
Board Chairman
By
Kelly A. Lore Date
Clerk of the Board
By
Ruth Zintzun Date
Purchasing & Contracts Manager
Attachments: Attachment "A" — Scope of Work
Attachment "B" — Not Used
Attachment "C"— Not Used
Attachment "D"—Allowable Direct Costs
Attachment "E" — Fee Proposal
Attachment "F"— Not Used
Attachment "G" — Not Used
Attachment "H"— Not Used
Attachment "I" — Cost Matrix & Summary
Attachment "J"— Not Used
Attachment "K" — Not Used
Attachment "L" — OCSD Safety Standards
JSK:ms
PCSA PROJECT NO. P2-123
Revised 072619 RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 19 of 19
9/4/2019
MEN Returned Activated
NON® Sludge Piping
OMENReplacement at
Plant No. 2
MCA .M
Project No. P2-123
�` A
Operations Committee Presentation
September 4, 2019
MEMO&&
Activated Sludge 131
Plant at Plant
• 1•
• Biological
treatment using
oxygen f ,
Is
• Built in 1979
• Includes � ► ■
three main :�` �
components
• Aeration basins
• Clarifiers ``
• Return activated
sludge system
2
1
9/4/2019
Sludge
s
• • • acement
• —2,000 feet of
10 to 36-inch pipe
• 40 years old
• Frequent leaks
Element 2 - Aeration
Basin Concrete Repair Z% < x,
• Maintain Structural
Integrity of Basin Deck
• Spall repair
• Crack repair
• Replace corroded
reinforcement
JjJ
4
2
9/4/2019
LightPole Replacement
�•L�'
• Replace 80 corroded light
poles and fixtures across
,r
entire site
• Collapsible poles for
better maintenance
access
-k" < • Safety for Staff
5
• Results6'*A ,.
AmountCompany
1. Shimmick Construction Company $6,042,110
2. W.M. Lyles Co. $6,593,870
3. Kiewit Infrastructure West Co. $6,843,000
4. Stanek Constructors, Inc. $8,414,700
5. Innovative Construction Solutions $8,732,865
6. Steve P. Rados, Inc. $8,837,625
7. Myers&Sons Construction LLC $10,620,000
8. OHL USA, Inc. $10,839,350
Engineer's Estimate $14,000,000
6
3
9/4/2019
L
Protest
rt rti
�.
• 2nd Low Bidder, W.M. Lyles Co., alleged issues
with Shimmick's safety record
• In consultation with General Counsel, staff
reviewed and determined the protest does not
merit a change to the award recommendation
• Many incidents are still pending determination
• Several were against joint venture partners
• No clear and consistent pattern of violations
Recommendations
• Deny award protest filed by W.M. Lyles Co.;
• Award a Construction Contract to Shimmick
Construction Company for Return Activated
Sludge Piping Replacement at Plant No. 2,
Project No. P2-123, for a total amount not to
exceed $6,042,111 .35; and
• Approve a Construction Contract contingency of
$604,211 (10%).
s
4
9/4/2019
Recommendations
• Approve a Professional Construction Services
(PCSA) Agreement with Spec Services Inc. to
provide construction support services for Return
Activated Sludge Piping Replacement at Plant
No. 2, Project No. P2-123, for a total amount not
to exceed $252,329; and
• Approve a contingency of $25,233 (10%)
9
Questi
• 04, -
10
5
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
OPERATIONS COMMITTEE (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-602 Agenda Date: 9/25/2019 Agenda Item No: 6.
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2, PROJECT NO. P2-123
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Receive and file Bid Tabulation and Recommendation for Return Activated Sludge Piping
Replacement at Plant No. 2, Project P2-123;
B. Receive and file Orange County Sanitation District's Notice of Intent to Award dated August 8,
2019;
C. Receive and file Award Protest from W.M. Lyles Co. dated August 13, 2019, concerning the
award to Shimmick Construction Company;
D. Receive and file response letter from Shimmick Construction Company dated August 20,
2019, regarding the bid protest of W.M. Lyles Co.;
E. Receive and file Orange County Sanitation District's determination letter dated August 23,
2019, to W.M. Lyles Co. responding to Award Protest;
F. Deny award protest filed by W.M. Lyles Co.;
G. Award a Construction Contract to Shimmick Construction Company for Return Activated
Sludge Piping Replacement at Plant No. 2, Project No. P2-123, for a total amount not to
exceed $6,042,111; and
H. Approve a Construction Contract contingency of $604,211 (10%).
BACKGROUND
Orange County Sanitation District's (Sanitation District) Plant No. 2 has two biological secondary
treatment facilities, one of which is the Activated Sludge Plant, which uses pure oxygen for
wastewater treatment. The Activated Sludge Plant was built in 1979 and includes a concrete deck
that seals oxygen into the process basins and ninety-two light poles and fixtures installed throughout
the facility to provide operators safe working conditions at night.
Orange County Sanitation District Page 1 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-602 Agenda Date: 9/25/2019 Agenda Item No: 6.
RELEVANT STANDARDS
• 24/7/365 treatment plant reliability
• Comply with California Government Code Section 4256 to engage the best qualified firm "on
the basis of demonstrated competence and qualifications" and "negotiate fair and reasonable
fees"
PROBLEM
There are three major deficiencies in the Activated Sludge Plant. Approximately 1,800 feet of sludge
piping and appurtenances ranging in size from 4 inches to 36 inches is corroded and no longer
provides reliable service. Repair of leaks on this pipe directly impacts the operation and capacity of
the plant. As corrosion continues, the frequency of leakage is expected to become worse and leaks
more difficult to repair.
Cracking and spalling of the concrete deck of the process basins pose oxygen safety threats and will
likely reduce the life of the plant.
Exterior light poles on the plant are corroded to the point where some light fixtures have fallen,
posing a safety hazard to operators from falling objects and insufficient lighting. The light poles also
require significant fall protection methods to service.
PROPOSED SOLUTION
Award a construction contract for replacement of the return activated sludge discharge piping, repair
the damaged concrete on the deck of the plant, and replace the light poles and fixtures.
TIMING CONCERNS
Delaying this project will extend the period when treatment interruptions could occur due to leaks
from corroded pipes and cracks in concrete, and safety hazards would not be addressed.
RAMIFICATIONS OF NOT TAKING ACTION
Reliability of the treatment process will suffer, and maintenance staff will be required to make
inefficient unplanned repairs to maintain the full operational ability of the aeration basin facilities. A
sudden pipeline rupture is a risk to staff and equipment in the tunnel system. The damaged concrete
and corroded light poles will continue to be safety concerns.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
The Sanitation District advertised Project No. P2-123 for bids on June 11, 2019 and eight sealed bids
Orange County Sanitation District Page 2 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-602 Agenda Date: 9/25/2019 Agenda Item No: 6.
were received on July 29, 2019. A summary of the bid opening follows:
Engineer's Estimate $14,000,000
Bidder Amount of Bid
Shimmick Construction Company $ 6,042,110.35
W.M. Lyles Co. $ 6,593,870.00
Kiewit Infrastructure West Co. $ 6,843,000.00
Stanek Constructors, Inc. $ 8,414,700.00
Innovative Construction Solutions (ICS) $ 8,732,866.00
Steve P. Rados, Inc. $ 8,837,625.00
Myers & Sons Construction, LLC $10,620,000.00
OHL USA, Inc. $10,839,350.00
The bids were evaluated in accordance with the Sanitation District's policies and procedures. A
notice was sent to all bidders on August 8, 2019 informing them of the intent of Sanitation District
staff to recommend award of the Construction Contract to Shimmick Construction Company.
W.M. Lyles Co., the second low bidder, sent a formal Protest of the award to the Sanitation District on
August 13, 2019, alleging bid defects in the Shimmick Construction Company bid due to various
accidents and safety incidents occurring on Shimmick Construction Company projects.
In consultation with Sanitation District General Counsel, the Sanitation District reviewed and
responded to this Protest. The protest does not merit a change to the award recommendation for the
following reasons:
1 . Many of the incidents cited in the Protest are not considered final for legal for administrative
purposes as they are still open or pending appeal.
2. Several of the incidents identified in the Protest were not cited against Shimmick Construction
Company specifically, but rather against several partners on joint venture projects.
3. The Sanitation District believes that the PCC and public policy behind California's competitive
bidding laws prohibit public agencies from finding a bidder non-responsible for safety reasons
unless the bidder demonstrates a clear and consistent pattern of significant safety violations or
an inability to take appropriate safety precautions; which is not the case with the valid items
listed in this protest.
Based on the above, staff, in consultation with Sanitation District's General Counsel, responded to
the W.M. Lyles Co. protest and found protest statement allegations unfounded. W.M. Lyles Co. can
still request an appeal of Sanitation District staff's determination as provided for by the Sanitation
District's procedures before the deadline of August 30, 2019.
After receipt of the bids and considering the cost differences when compared with the Engineer's
estimate, staff, in consultation with the design consultant, reviewed the Engineer's estimate and
determined there were some conservative assumptions made about the material, equipment, and
construction methodology to be used to complete this project. Also, the most competitive bids may
Orange County Sanitation District Page 3 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-602 Agenda Date: 9/25/2019 Agenda Item No: 6.
be taking advantage of reduced overhead costs. Considering that there are several bids within the
same range, staff believes that the low bids are valid and recommends award as stated above.
CEQA
This project is exempt from CEQA under the Class 1 categorical exemptions set forth in California
Code of Regulations Section 15301. Section 15301 (Class 1) exempts from CEQA "the operation,
repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private
structures, facilities, mechanical equipment, or topographical features, involving negligible or no
expansion of use beyond that existing at the time of the lead agency's determination", including "(b)
Existing facilities of both investor and publicly-owned utilities used to provide electric power, natural
gas, sewerage, or other public utility services".
The project consists of minor alterations to existing public facilities.
A Notice of Exemption for this project was filed and recorded with the County of Orange on March 29,
2018 after the Board of Directors approved the Professional Design Services Agreement.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of the Sanitation District's Purchasing Ordinance. This
project has been budgeted (FY2019-20 Budget Update, Appendix A, Page A-10) and the budget is
sufficient for the action.
ATTACHMENT
The following attachment(s) are included in hard copy may also be viewed on-line at the OCSD website (www.ocsd.com)
with the complete agenda package:
• W.M. Lyles Co. Award Protest Letter
• Shimmick Construction Company Response to Bid Protest Letter
• Sanitation District Response to W.M. Lyles Co. Award Protest
• Sanitation District Intent to Award Letter
• Construction Contract (Online Only)
• September 4, 2019 Operations Committee Presentation (Online Only)
Orange County Sanitation District Page 4 of 4 Printed on 9/19/2019
powered by LegistarTM
W Corporate Office
W. A LYLES CO.
P.O.Box 4377
Fresno,CA 93744-4377
CONTRACTOR Telephone(559)441-1900
s11943 Fax(559)487-7958
Progress Through Performance" www.wmlyles.com
An Equal Opportunity Employer
California Contractor's License No.422390
August 13, 2019
Orange County Sanitation District
Attn: Mr. Jay Kaura, Contracts Administrator
10844 Ellis Avenue
Fountain Valley, CA 92708
via electronic mail to: construction(f)ocsd.com
Re: Award Protest Statement. W. M. Lyles Co.'s Bid Protest for the Orange County
Sanitation District's ("OCSD")Return Activated Sludge Piping Replacement at
Plant No. 2. Project No. P2-123 ("Project")
Dear Mr. Kaura:
As we are in receipt of OCSD's Award Recommendation Notice dated August 8, 2019, for the
above-referenced Project, we are writing you and this letter shall serve as W. M. Lyles Co.'s
("WML") formal Award Protest Statement concerning OCSD's recommendation to award the
project to Shimmick Construction Company,Inc. ("SHIMMICK").
WML requests that OCSD not award the project to SHIMMICK. SHIMMICK's past safety
violations give OCSD grounds to reject its bid for non-responsibility. Accordingly,WML requests
that OCSD not award the project to SHIMMICK and award the project contract to WML as the
lowest responsive and responsible bidder on this Project.
SHIMMICK IS NOT A RESPONSBILE AND/OR QUALIFIED CONTRACTOR FOR
THIS PROJECT BECAUSE IT HAS NUMEROUS PRIOR SERIOUS AND REPEATED
SAFETY VIOLATIONS EVIDENCING AN INABILITY TO CONTROL AND
MAINTAIN SAFE PROJECT SITES
The Instruction to Bidders, at Item IB-13(B)(2),pages 7 & 8, states that,
For purpose of evaluating the Safety record of a Bidder, if the Bidder has any Serious,
Repeat...citations pursuant to Part 1 of Division 5 of the Labor Code and has not taken
appropriate corrective action to abate further such violations.....the Bidder may be deemed
Not Responsible and its Bid Rejected.
Corporate Office: 1210 W.Olive,Fresno,CA 93728
Bakersfield (661)387-1600 Fresno (559) 268-1540 Temecula (951)973-7393 . Rocklin(916)375-18331 Visalia(559)651-1450
W. Corporate Office
. M. LYLES CO.
P.O.Box 4377
Fresno,CA 93744-4377
CONTRACTOR Telephone(559)441-1900
SL—s9s3 Fax(559)487-7958
Progress Through Petformarjee" www.wmlyles.com
An Equal Opportunity Employer
California Contractor's License No.422390
Furthermore, Section BF-6(1) of the bid proposal asks, "Does the CONTRACTOR have any
Serious, Willful,Repeat...citations....during the past five-year period?"
SHIMMICK, pursuant to Exhibit A, attached hereto and incorporated herein by this reference
(hereinafter "OSHA Reports"), has two fatalities, numerous serious violations and repeated
violations within the past five-year period. Said OSHA Reports reveal that SHIMMICK has
twenty(20)serious violations and at least two repeated violations happening on separate occasions
(i.e., three 1509(A) violations, and two 3203(A) violations), from July 2014 through July 2019.
The fatality cases involve multiple serious violations (see Case #3 and Case #10 for fatalities).
The recent past safety citation record in said OSHA Reports demonstrates SHIMMICK's inability 1
to control and maintain safe project sites.
Two separate incidents resulted in the partial amputation of a worker's finger(s) (see cases#9 and
#17)and another resulted in a worker sustaining a fracture in his/her tibia and fibula(see case#5).
SHIMMICK had repeated violations of California Code of Regulations at Title 8, Division 1,
Chapter 4, Subchapter 7, at § 3203(a). Please note that said §3203 sets forth the requirement to
have an Injury and Illness Prevention Program. SHIMMICK has apparently been cited on two
separate occasions for inadequate IIPP. Accordingly, SHIMMICK's OSHA Report indicates that
SHIMMICK is not a responsible bidder within the meaning of California Public Contract Code
§1103.
REJECTING SHIMMICK'S BID COMPORTS WITH SOUND PUBLIC POLICY
INVOLVING THE PROTECTION OF THE PUBLIC AND REJECTING ITS BID FOR
RESPONSIBILITY IS SUPPORTED BY CASE AND STATUTORY LAW
OCSD should strongly consider rejecting SHIMMICK as an irresponsible bidder in light of
protecting the citizens within the jurisdiction of the OCSD. OCSD is clearly legally permitted to
reject SHIMMICK's bid for want of responsibility (see Exhibit B below for legal basis). The
public has an interest in the safe construction of public works projects. In calculating the sum total
of protecting the public, dollars and cents are not the only factor to consider. The safety of the
public is of great importance as the public can either be injured by encountering unsafe project
sites or as workers at a project site.
Serious injury and fatalities are to be avoided at all costs due to the heavy toll on the families
impacted by same. While nearly impossible to quantify, such injuries have a fiscal impact upon
the citizens within the jurisdiction of the OCSD. Within the construction industry,it is well known
that serious injuries and fatalities generally always lead to law suits and other costs,which,in turn,
drive up the overall cost of a given project. As such, OCSD is well within their rights to consider
the protection of the citizens of OCSD by requiring its contractors to have a demonstrably safe
construction record. OCSD's exercise of discretion in rejecting SHIMMICK's bid for want of
responsibility would provide physical and fiscal safety for the citizens within OCSD's jurisdiction.
Corporate Office: 1210 W.Olive,Fresno,CA 93728
Bakersfield (661)387-1600 1 Fresno(559)268-1540 1 Temecula(951)973-7393 1 Rocklin(916)375-1833:Visalia(559)651-1450
Corporate Office
W. A LYLES CO. P.O.Box 4377
Fresno,CA 93744-4377
CONTRACTOR Telephone(559) 441-1900
y-1945 Fax(559)487-7958
Progress Throug/) I'erfor•rr ance' www.wmlyles.com
An Equal Opportunity Employer
California Contractor's License No.422390
OCSD has rightly taken steps to evaluate the overall competency of the contractors submitting
proposals on this project. Competency embraces a contractor's prior performance,which includes
their safety record. In this respect, SHIMMICK fails and has demonstrated an inability to
implement proper safety procedures and/or adequately supervise its project sites. It would be well
within OCSD's right to determine that SHIMMICK lacks the required responsibility and
competency to safely build this Project.
In support of the above, please see Exhibit B setting forth legal, regulatory and contractual basis
for rejecting SHIMMICK's bid. Attached, as Exhibit C, are applicable pages from the IFB that
were referenced above. As WML was the second lowest bidder,there are no other affected parties
who would stand in line to be awarded the Project contract and thus no information is provided
regarding any other bidder.
In contrast to SHIMMICK,WML has no serious,willful, or repeated violations and WML's
safety history aligns with OCSD's safety requirements. In this regard, please see WML's
detailed OSHA Report, attached hereto and incorporated herein by this reference as Exhibit D.
Furthermore,please see August 16,2018 Article written by Megan Cassidy and Lauren Hernandez
from the San Francisco Chronicle discussing SHIMMICK's safety problems for SHIMMICK's
work for the San Francisco Municipal Transportation Agency, attached hereto and incorporated
herein by this reference as Exhibit E. Finally, attached, as Exhibit F, is a spreadsheet providing a
summation of SHIMMICK's OSHA citations over the past five years.
CONCLUSION
WML, accordingly, requests that OCSD: 1) grant WML's bid protest by not awarding the Project
contract to SHIMMICK on the grounds of SHIMMICK's safety related deficiencies (i.e., lack of
responsibility); and 2)award the contract to WML as the lowest responsive,responsible bidder on
the Project. WML looks forward to working with OCSD on this important Project.
This letter is intended to be: 1) a protest against any award of the contract to a bidder other than
WML; 2) a request pursuant to Government Code §54954.1 for written notice of all meetings of
OCSD at which any issues pertaining to the award of said contract are on the agenda for the
meeting; 3) a request for communications by and between OCSD and SHIMMICK regarding
WML's bid protest; 4) a request as soon as staff either reports or renders recommendations
concerning any issues pertaining to the award of said contract (by telephone or fax and by email)
are available to the public so we can promptly review same; and 5) a request to address OCSD
pursuant to California Government Code §54954.3(a)which sets forth our right to address OCSD
before or during consideration of any issues related to the award of said Contract.
Corporate Office: 1210 W.Olive,Fresno,CA 93728
Bakersfield (661)387-1600 1 Fresno(559)268-1540 1 Temecula(951)973-7393 1 Rocklin(916)375-18331 Visalia (559) 651-1450
W. A LYLES CO. Corporate Office
P.O.Box 4377
Fresno,CA 93744-4377
CONTRACTOR Telephone(559)441-1900
Si-1945 Fax(559)487-7958
Progress Through Pcrfo?-mance www.wmlyles.com
An Equal Opportunity Employer
California Contractor's License No.422390
Please advise if we need to take any further steps to secure our rights and requests set forth above
so that we can promptly comply. If we do not receive a response from you, we will proceed on
the basis that this letter is sufficient to protest the bid of SHIMMICK.
Verification and Execution
I am the Sr. Vice President of W. M. Lyles Co., and I have read the foregoing Award Protest
Statement and know the contents thereof; and I certify that the same is true of my own
knowledge, except as to those matters which are therein stated upon my information and belief,
and as to those matters I believe it to be true.
I declare,under penalty of perjury,under the laws of the State of California, that the foregoing
is true and correct.
By r
Robert P. Saleen
Sr. Vice President of W. M. Lyles Co.
Enclosures/6
Mde
Corporate Office: 1210 W.Olive,Fresno,CA 93728
Bakersfield (661)387-1600 Fresno(559)268-1540 1 Temecula(951)973-7393 1 Rocklin(916)375-1833 1 Visalia (559) 651-1450
Exhibit A: OSHA Report
Page 1 of 14
Case
# AcGnly Opened RID St Type Sc sic NAICS I Vw Establishment Name
Q 1 13J994 M5 0511012019 0950544 CA Accident Partial 237110 Shimmick Construction
i
p 2 1323735.015 08127/2018 0950624 CA Lrprog Rel Partial 236220 Shimmick Construction Company,Inc.And CaVoinia Engineering
Contractors,Inc.JcintVentare
3 1339097 015 081M'2018 0950,651 CA FaVCat Partial 237990 4 Shimmick Construction Co Ire Ard Con-Guest Contractors Inc
4 1325793.015 062112018 1055320 VvA Referral Partial 236220 Vv'j317930004-Shunmick Parscns J �.
5 1302615015 032012018 0950635 CA Accident Partial 236220 2 ShimmickTocAmpregilioJv
6 1263341.015 09111.,2017 0936200 CA Planned Partial 237990 N'ovaShunfrickA Joint Venture
7 1252441 015 0711IR12017 0936200 CA Unprog Partial 237993 1 N wa Shimmick.Joint Venlure
Other
8 1252345.015 0711 V2017 0936200 CA Planned Complete 237993 1 Nava Shimmick Joint Venture
9 1205081.015 01IM2017 0956,611 CA Accident Partial 236220 Shimmick IMclrctsonJv
10 1192534-015 M2112016 0950643 CA FatCat Partial 236223 6 Shimmick Construction Company Inc.
11 1168158-015 102112016 1055320 VuA Referral Partial 236220 3 bN071942851-Shimmick Construction Company Inc
12 1167915.015 0729/2016 1055320 WA Planned Partial 236220 Vv07941606-Shimmick Construction Company Inc
13 1144056-015 042012016 0950535 CA Accident Partial 237310 4 Shimmick Fcc Impregilo Joint Venture
14 1080515-015 071DW2015 0950631 CA Referral Partial 236210 3 Shimmick Construction Company,Inc.
15 1061841.015 0510t12015 0950635 CA Complaint Partial 237990 Shimmicl;Construction Company Inc
I
i
16 1059365.015 04210015 0950631 i CA Referral Partial 237990 2 Shimmick Construction Company Inc
17 1021893-015 0113012015 0950611 CA Accident Partial 236220 2 Shimmick•Nicholson Construction.A Joint Venture
18 995229A15 0821/2014 0936200 CA Planned Complete 236210 Nova Shimmick Ajv
UNITED STATES
DEPARTMENT OF LABOR Exhibit A: Page 2 of 14
OSHA English I Spanish
Find it in OSHA Q
A TO Z INDEX
OSHA - WORKER - EMPLOYER - STANDARDS - ENFORCEMENT - CONSTRUCTION - TOPIC - NEWS/RESOURCES - DATA - TRAINING -
Inspection Detail
Quick Link Reference
1399946.015 1 1323735.015 1 1339097.015 1 1325793.015 1 1302815.015 1 1263341.015 1 1252441.015 1 1252345.015 1 1205081.015 1 1192534.015
1 1188158.015 1 1167915.015 1 1144056.015 1 1080515.015 1 1061841.015 1 1059365.015 1 1021893.015 1 995229.015
Case Status:OPEN
Note:The following inspection has not been indicated as closed. Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1399946.015-Shimmick Construction
Inspection Information-Office:Ca Monrovia District Office Case#1
Nr: 1399946.015 Report ID:0950644 Open Date: 05/10/2019
Shimmick Construction
1210 Fullerton Rd. Union Status: NonUnion
City Of Industry,CA 91748
SIC:
NAICS: 237110/Water and Sewer Line and Related Structures Construction
Mailing: 8201 Edgewater Dr.Suite 202,Oakland,CA 94621
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference:
Close Case:
Related Activity: Type ID Safety Health
Accident 1451236
Case Status:OPEN
Case Status: CLOSED
Inspection: 1323735.015-Shimmick Construction Company,Inc.And California Engineering
Contractors,Inc.Joint Venture
Inspection Information-Office:Ca Modesto
Nr: 1323735.015 Report ID:0950624 Open Date:08/27/2018 Case#2
Shimmick Construction Company,Inc.And California Engineering Contractors,Inc.Joint Venture
200 Valpico Dr.
Tracy,CA 95376 Union Status: Nonunion
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Drive Ste 201,Oakland,CA 94621
Inspection Type: Unprog Rel
Scope: Partial Advanced Notice: N
Ownership: Private Exhibit A: Page 3 of 14
Safety/Health: Safety Close Conference: 11/30/2018
Close Case: 02/25/2019
Case Status:CLOSED
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $0 $0 $0 $410 $0 $410
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
Deleted 1. 01001 Other 3203(A)(4) 11/30/2018 $0 $410 $0 I-Informal Settlement
Case Status:VIOLATIONS UNDER CONTEST
Note:The following inspection has not been indicated as closed.Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1339097.015-Shimmick Construction Co Inc And Con-Quest Contractors Inc
Inspection Information-Office:Ca Sacramento M&T District Office
Nr: 1339097.015 Report ID:0950651 Open Date: Case#3
08/10/2018
Shimmick Construction Co Inc And Con-Quest Contractors Inc
1 West Portal Ave.
Union Status: Union
San Francisco,CA 94127
SIC:
NAICS: 237990/Other Heavy and Civil Engineering Construction
Mailing: 8201 Edgewater Drivesuite 202,Oakland,CA 94621
Inspection Type: Fat/Cat
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/08/2019
Emphasis: S:Tunnel Close Case:
Related Activity: Type ID Safety Health
Accident 1369816
Case Status:VIOLATIONS UNDER CONTEST
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 4 4
Current Violations 4 4
Initial Penalty $65,300 $0 $0 $0 $0 $65,300
Current Penalty $65,300 $0 $0 $0 $0 $65,300
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Exhibit A: Page 4 of 14
1. 01001 Serious 3203(A) 02/08/2019 $25,000 $25,000 $0 03/12/2019 -
2. 02001 Serious 4991(A) 02/08/2019 $25,000 $25,000 $0 03/12/2019 -
3. 03001 Serious 8473(A) 02/08/2019 02/27/2019 $7,650 $7,650 $0 03/12/2019 -
4. 04001 Serious 8473(F) 02/08/2019 02/27/2019 $7,650 $7,650 $0 03/12/2019 -
Accident Investigation Summary
Summary Nr: 108350.015 Event: 08/10/2018 Employee Is Caught Between Railway Tracks And Asphyxiates
At 4:48 p.m.on August 10,2018,an employee was walking when he was struck by a steel beam and caught between it and the railway tracks,asphyxiating
him.
Keywords: railroad track,caught between,asphyxiated,steel beam
Inspection Degree Nature Occupation
1 1339097.015 Fatality Asphyxia Electricians
Case Status:CLOSED
Inspection: 1325793.015-Wa317950004-Shimmick Parsons]v
Inspection Information-Office:Washington Region 2
Nr: 1325793.015 Report ID: 1055320 Open Date:06/21/2018 Case #4
Wa317950004-Shimmick Parsons]v
2700 Se Bellevue Way
Union Status: Nonunion
Bellevue,WA 98004
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Dr Ste 202,Oakland,CA 94621
Inspection Type: Referral
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/27/2018
Close Case: 07/27/2018
Related Activity: Type ID Safety Health
Referral 1353001 Yes
Case Status:CLOSED
Case Status:VIOLATIONS UNDER CONTEST
Note:The following inspection has not been indicated as closed.Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1302815.015-Shim mick/Fcc/Impregilio]v
Inspection Information-Office:Ca Long Beach District Office
Nr: 1302815.015 Report ID: 0950635 Open Date:
03/20/2018 Case#5
Shimmick/Fcc/Impregilio)v
481 Pier D Ave.West
Union Status: Union
Long Beach,CA 90802
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Dr#202,Oakland,CA 94621
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private Exhibit A: Page 5 of 14
Safety/Health: Safety Close Conference: 07/23/2018
Close Case:
Related Activity: Type ID Safety Health
Accident 1315280
Case Status:VIOLATIONS UNDER CONTEST
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $36,000 $0 $0 $0 $0 $36,000
Current Penalty $36,000 $0 $0 $0 $0 $36,000
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 1509(A) 07/23/2018 08/09/2018 $18,000 $18,000 $0 09/11/2018 -
2. 02001 Serious 4981(C) 07/23/2018 08/09/2018 $18,000 $18,000 $0 09/11/2018 -
Accident Investigation Summary
Summary Nr: 107488.015 Event: 01/24/2018 Employee Is Struck By Wire Rope And Leg Is Fractured
At 10:00 a.m.on January 24,2018,Employee#1 and Coworkers#1 and#2,employed by a construction company,were working at a bridge replacement
project.Employee#1,an Iron worker,was working on an elevated bridge platform,235 feet above grade,and welding eyelets to the platform.Coworkers#1
and#2,also on the elevated platform,began to pull 1 inch diameter wire rope from an uncoiler.As the wire rope came free of the uncoiler,the tail end of the
wire rope whipped around and struck Employee#1's left leg.Coworkers#1 and#2 radioed the foreman stationed on the ground.The foreman organized a
response team,which used a man basket attached to a tower crane to ascend to the elevated work platform. Employee#1 was placed in the man basket and
lowered to the ground. Emergency services were called,and Employee#1 was transported to the hospital.He was admitted and treated,including surgery,for
fractures to his left leg tibia and fibula.
Keywords:struck by,construction,fracture,leg,iron worker,elevated work platform,bridge,tower crane,welding,wire rope
Inspection Degree Nature Occupation
1 1302815.015 Hospitalized injury Cut/Laceration Laborers,except construction
Case Status:CLOSED
Inspection: 1263341.015-Nova Shimmick A Joint Venture
Inspection Information-Office:San Diego Area Office
Nr: 1263341.015 Report ID:0936200 Open Date: 09/11/2017 Case#6
Nova Shimmick A Joint Venture
Point Loma Fuel Pier
Union Status: Nonunion
San Diego,CA 92113
SIC:
NAICS: 237990/Other Heavy and Civil Engineering Construction
Mailing: 185 Devlin Rd, Napa,CA 94558
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/18/2017
Emphasis: L:Progcon,P:Progcon Close Case: 09/18/2017
Case Status:CLOSED
Case Status:CLOSED
Inspection:1252441.015-Nova Shimmick Joint Venture
Inspection Information-Office:San Diego Area Office Exhibit A: Page 6 of 14
Nr: 1252441.015 Report ID: 0936200 Open Date:
07/19/2017
Nova Shimmick Joint Venture Case#7
Naval Base Point Lomafuel Depot Area
S Union Status: Union
San Diego,CA 92106
SIC:
NAICS: 237990/Other Heavy and Civil Engineering Construction
Mailing: 185 Devlin Rd,Napa,CA 94558
Inspection Type: Unprog Other
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/21/2017
Close Case: 06/14/2018
Related Activity: Type ID Safety Health
Referral 1277117 Yes
Case Status:CLOSED
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $11,408 $0 $0 $0 $0 $11,408
Current Penalty $10,500 $0 $0 $0 $0 $10,500
FfA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 19260250 A01 10/24/2017 $10,500 $11,408 $0 11/06/2017 R-Review Commission
Case Status:CLOSED
Inspection:1252345.015-Nova Shimmick Joint Venture
Inspection Information-Office:San Diego Area Office
Nr: 1252345.015 Report ID: 0936200 Open Date: 07/11/2017 Case#8
Nova Shimmick Joint Venture
Naval Base Point Loma2907 Shelter Island Dr.
Union Status; Nonunion
San Diego,CA 92106
SIC:
NAICS: 237990/Other Heavy and Civil Engineering Construction
Mailing: 185 Devlin Rd, Napa,CA 94558
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/14/2017
Emphasis: L:Progcon,P:Progcon Close Case: 02/06/2018
Case Status:CLOSED
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1 Exhibit A: Page 7 of 14
Initial Penalty $4,889 $0 $0 $0 $0 $4,889
Current Penalty $0 $0 $0 $4,889 $0 $4,889
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 19260405 G02 IV 08/31/2017 $4,889 $4,889 $0 I-Informal Settlement
Case Status:CLOSED
Inspection: 1205081.015-Shimmick/Nicholson 7v
Inspection Information-Office:Ca San Francisco
Nr: 1205081.015 Report ID:0950611 Open Date:
O1/24/2017 Case#9
Shimmick/Nicholson Iv
101 First St.
San Francisco,CA 94105 Union Status: Union
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Dr.Suite#202,Oakland,CA 94621
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/05/2017
Close Case: 12/13/2017
Related Activity: Type ID Safety Health
Complaint 1184073 Yes
Accident 1173756
Case Status:CLOSED
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $0 $0 $0 $300 $0 $300
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
Deleted 1. 01001 Other 5001(E) 04/10/2017 $0 $300 $0 04/20/2017 F-Formal Settlement
Accident Investigation Summary
Summary Nr: 94459.015 Event: 01/15/2017 Construction Foreman Directing Rigging Has Two Finger Amputa
At 3:10 p.m.on January 15,2017,Employee#1,a foreman for a construction company,Coworker#1,employed by the company to assist Employee#1,and
Coworker#2,who was operating an excavator,were engaged in rigging work at a construction excavation site.Employee#1 was directing the work. Employee
#1 and Coworker#1 rigged bundles of hollow bar drill steel rod onto an excavator,Komatsu PC228USLC.The bundles consisted of 10 rods,and each rod
weighed approximately 140 pounds.The bundled rods were moved approximately 15 feet across the south side of the excavation site.Coworker#2,operating
the excavator,then began to lower the load to the ground.The steel hook from the rigging struck and crushed Employee#1's right hand. Emergency services
were called,and Employee#1 was transported to the hospital. He was admitted and treated for the amputation of his right hand's middle and ring fingers.
LAlll V1L L 1. 1 CL�V V Vl 1T
Keywords:struck by,amputation,rigging,material handling,construction,excavator,finger,hand,crushed,steel tube
Inspection Degree Nature Occupation
1 1205081.015 Hospitalized injury Amputation Construction laborers
Case Status:VIOLATIONS UNDER CONTEST
Note:The following inspection has not been indicated as closed.Please be aware that the information shown may change,e.g,violations may be added
or deleted.For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1192534.015-Shimmick Construction Company Inc.
Inspection Information-Office:Ca Van Nuys
Nr: 1192534.015 Report ID: 0950643 Open Date: Case#10
11/21/2016
Shimmick Construction Company Inc.
4765 Spring Rd. Union Status: Union
Moorpark,CA 93020
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Dr.,Oakland,CA 94621
Inspection Type: Fat/Cat
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/11/2017
Close Case:
Related Activity: Type ID Safety Health
Accident 1157737
Case Status:VIOLATIONS UNDER CONTEST
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 3 6
Current Violations 3 3 6
Initial Penalty $46,800 $0 $0 $1,600 $0 $48,400
Current Penalty $46,800 $0 $0 $1,600 $0 $48,400
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 43000029 B01 04/26/2017 05/31/2017 $400 $400 $0 05/25/2017
2. 01002 Other 3650(T)(15) 04/26/2017 05/31/2017 $600 $600 $0 05/25/2017 -
3. 01003 Other 3650(T)(33) 04/26/2017 05/31/2017 $600 $600 $0 05/25/2017 -
4. 02001 Serious 3328(A)(2) 04/26/2017 05/15/2017 $14,400 $14,400 $0 05/25/2017 -
5. 03001 Serious 3650(T) 04/26/2017 05/15/2017 $14,400 $14,400 $0 05/25/2017 -
6. 04001 Serious 3650(T)(11) 04/26/2017 05/15/2017 $18,000 $18,000 $0 05/25/2017 -
Accident Investigation Summary
Summary Nr: 90735.015 Event: 11/16/2016 Employee Is Caught Between Forklift And Wall And Is Killed
At 7:48 p.m.on November 16,2016,an employee was operating a Caterpillar telehandler forklift Model 1055C,serial number KDE01436.The employee was
traveling down a dirt slope ramp that was approximately twenty percent grade with the forks downgrade and the plate compactor attached to the fork with a
chain.The employee was driving with the cab door open at the time of the accident.The employee operating the forklift lost control,went into the trench and
was ejected from the cab.The employee was pinned between the forklift and the dirt wall.The employee suffered internal injuries and a fractured pelvis and
was fatally injured. Exhibit A: Page 9 of 14
Keywords:crushing,material handling,powered industrial vehicle,construction vehicle,struck by
Inspection Degree Nature Occupation
1 1192534.015 Fatality Bruise/Contus/Abras Construction laborers
Case Status:VIOLATIONS UNDER CONTEST
Note:The following inspection has not been indicated as closed. Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1188158.015-Wa317942851-Shimmick Construction Company Inc
Inspection Information-Office:Washington Region 2
Nr: 1188158.015 Report ID: 1055320 Open Date: 10/21/2016 Case#11
Wa317942851-Shimmick Construction Company Inc
Minor St.X Thomas St.Across From 222 Minor St.
Union Status: Nonunion
Seattle,WA 98101
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Dr Ste 202,Oakland,CA 94621
Inspection Type: Referral
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/28/2016
Close Case:
Related Activity: Type ID Safety Health
Referral 1152088 Yes
Case Status:VIOLATIONS UNDER CONTEST
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 2 3
Current Violations 1 2 3
Initial Penalty $4,800 $0 $0 $0 $0 $4,800
Current Penalty $4,800 $0 $0 $0 $0 $4,800
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001A Serious 296-155-53408(2)(D)(I) 12/15/2016 10/21/2016 $4,800 $4,800 $0 12/29/2016
2. 01001E Serious 296-155-53401(5)(I) 12/15/2016 10/21/2016 $0 $0 $0 12/29/2016
3. 02001 Other 296-155-53401(5)(A) 12/15/2016 10/21/2016 $0 $0 $0 12/29/2016 -
4. 02002 Other 296-155-53401(5)(G) 12/15/2016 10/21/2016 $0 $0 $0 12/29/2016 -
Case Status:CLOSED
Inspection: 1167915.015-Wa317941606-Shimmick Construction Company Inc
Inspection Information-Office:Washington Region 2
Nr: 1167915.015 Report ID: 1055320 Open Date:
07/29/2016 Case#12
Wa317941606-Shimmick Construction Company Inc Exhibit A: Page 10 of 14
7004 Beach Dr Sw
Union Status: Union
Seattle,WA 98136
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Dr Ste 202,Oakland,CA 94621
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/09/2016
Emphasis: P:Constr,S:Constr Close Case: 08/09/2016
Case Status:CLOSED
Case Status: PENDING ABATEMENT OF VIOLATIONS
Note:The following inspection has not been indicated as closed. Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1144056.015-Shimmick Fcc Impregilo Joint Venture
Inspection Information-Office:Ca Long Beach District Office
Nr: 1144056.015 Report ID: 0950635 Open Date: 04/20/2016 Case#13
Shimmick Fcc Impregilo Joint Venture
280 Pier T Ave
Long Beach,CA 90802 Union Status: Nonunion
SIC:
NAICS: 237310/Highway,Street,and Bridge Construction
Mailing: 8201 Edgewater Drsuite 202,Oakland,CA 94621
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/07/2016
Close Case:
Related Activity: Type ID Safety Health
Accident 1081839
Case Status: PENDING ABATEMENT OF VIOLATIONS
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2 4
Current Violations 2 2 4
Initial Penalty $36,000 $0 $0 $1,685 $0 $37,685
Current Penalty $36,000 $0 $0 $1,685 $0 $37,685
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 1511(B) 10/07/2016 10/26/2016 $560 $560 $0 Z-Issued
2. 01002 Other 5042(A)(9) 10/07/2016 10/26/2016 $1,125 $1,125 $0 Z-Issued
3. 02001 Serious 3385(A) 10/07/2016 10/19/2016 $18,000 $18,000 $0 Z-Issued
4. 03001 Serious 4999(C)(1) 10/07/2016 10/19/2016 $18,000 $18,000 $0 Z-Issued
Exhibit A: Page 11 of 14
Case Status:VIOLATIONS UNDER CONTEST
I
Note:The following inspection has not been indicated as closed. Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases, in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1080515.015-Shimmick Construction Company,Inc.
Inspection Information-Office:Ca Santa Ana District Office
Nr: 1080515.015 Report ID: 0950631 Open Date: Case#14
07/08/2015
Shimmick Construction Company,Inc.
Southbound I-5 Off-Ramp-Exit 79 To Pch/
Camino Las Ramblas Union Status: Union
San Juan Capistrano,CA 92675
SIC:
NAICS: 236210/Industrial Building Construction
Mailing: 8201 Edgewater Dr.Suite 202,Oakland,CA 94621
Inspection Type: Referral
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/06/2016
Close Case:
Related Activity: Type ID Safety Health
Referral 1002304 Yes
Case Status:VIOLATIONS UNDER CONTEST
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 3
Current Violations 3 3
Initial Penalty $26,770 $0 $0 $0 $0 $26,770
Current Penalty $26,770 $0 $0 $0 $0 $26,770
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 1509(A) 01/06/2016 $7,650 $7,650 $0 01/20/2016
2. 02001 Serious 16160001 NO3 01/06/2016 $9,560 $9,560 $0 01/20/2016
3. 03001 Serious 161600010 01/06/2016 $9,560 $9,560 $0 01/20/2016 -
Case Status:CLOSED
Inspection: 1061841.015-Shimmick Construction Company Inc
Inspection Information-Office:Ca Long Beach District Office
Nr: 1061841.015 Report ID: 0950635 Open Date:05/08/2015 Case#15
Shimmick Construction Company Inc
708 Pier A Street
Wilmington,CA 90744 Union Status: Nonunion
SIC:
NAICS: 237990/Other Heavy and Civil Engineering Construction
Mailing: 708 Pier A Street,Wilmington,CA 90744
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private Exhibit A: Page 12 of 14
Safety/Health: Health Close Conference: 06/10/2015
Close Case: 06/10/2015
Related Activity: Type ID Safety Health
Complaint 982164 Yes
Case Status:CLOSED
Case Status:OPEN
Note:The following inspection has not been indicated as closed. Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1059365.015-Shimmick Construction Company Inc
Inspection Information-Office:Ca Santa Ana District Office
Nr: 1059365.015 Report ID:0950631 Open Date: Case#16
04/21/2015
Shimmick Construction Company Inc
Nb 5 Frwy Overcrossing At Las Ramblasbetween
Camino De Estrella And San Juan Creek Rd
Union Status: Union
Undercrosss
San Juan Capistrano,CA 92675
SIC:
NAICS: 237990/Other Heavy and Civil Engineering Construction
Mailing: 8201 Edgewater Drive,Suite 201,Oakland,CA 94621
Inspection Type: Referral
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/01/2015
Close Case:
Related Activity: Type ID Safety Health
Referral 979690 Yes
Case Status:OPEN
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 1 3
Current Violations 2 2
Initial Penalty $15,300 $0 $0 $475 $0 $15,775
Current Penalty $15,300 $0 $0 $0 $0 $15,300
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
Deleted 1. 01001 Other 1509(A) 10/02/2015 $0 $475 $0 10/14/2015 J-AU Decision
2. 02001 Serious 1620(A) 10/02/2015 $7,650 $7,650 $0 10/14/2015 J-AU Decision
3. 03001 Serious 1712(C)(1) 10/02/2015 $7,650 $7,650 $0 10/14/2015 J-AU Decision
Case Status:OPEN
Note:The following inspection has not been indicated as closed. Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases,in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1021893.015-Shimmick-Nicholson Construction,A Joint Venture Exhibit A: Page 13 of 14
Inspection Information-Office:Ca San Francisco
Nr: 1021893.015 Report ID: 0950611 Open Date: 01/30/2015 Case#17
Shimmick-Nicholson Construction,A Joint Venture
415 Mission St
Union Status: Nonunion
San Francisco,CA 94105
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 8201 Edgewater Drive,Suite 202,Oakland,CA 94621
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/30/2015
Close Case:
Related Activity: Type ID Safety Health
Accident 934258
Case Status:OPEN
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 2 3
Current Violations 1 1 2
Initial Penalty $9,000 $0 $0 $900 $0 $9,900
Current Penalty $9,000 $0 $0 $450 $0 $9,450
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
Deleted 1. 01001 Other 1512(D) 04/29/2015 05/08/2015 $0 $450 $0 05/08/2015 J-ALI Decision
2. 01002 Other 1509(A) 04/29/2015 05/08/2015 $450 $450 $0 05/08/2015 J-ALI Decision
3. 02001 Serious 1541(A) 04/29/2015 05/04/2015 $9,000 $9,000 $0 05/08/2015 J-ALJ Decision
Accident Investigation Summary
Summary Nr: 70263,015 Event: 01/12/2015 Worker'S Finger Is Caught Between Wall And Debris And Requir
At 8:30 p.m.on January 12,2015,Employee#1 and coworker were engaged in excavation work at a commercial building construction site. Employee#1 was
removing debris from a wall damaged by an excavator and the coworker was operating the excavator.The excavator hit a static line that Employee#1 was
holding onto. Employee#1's hand was caught between the static line and the wall. Emergency services were called,and Employee#1 was transported to the
hospital.He was admitted and treated for fractures and lacerations to his hand.The injury to his index finger was sufficiently severe and required amputation of
the finger.
Keywords:wall,laceration,amputation,fracture,construction,excavation,excavator,finger,elevated work platform,caught between
Inspection Degree Nature Occupation
1 1021893.015 Hospitalized Injury Cut/Laceration Construction Laborer
Case Status:CLOSED
Inspection:995229.015-Nova Shimmick Ajv
Inspection Information-Office:San Diego Area Office
Nr: 995229.015 Report ID:0936200 open Date: Exhibit A: Page 14 of 14
08/21/2014
Nova Shimmick Ajv
Fuel Farm-Naysupfltlogctrsd, 199 Rosecrans St,Bldg Case #18
50 Union Status: Union
San Diego,CA 92106
SIC:
NAICS: 236210/Industrial Building Construction
Mailing: 2907 Shelter Island Dr.,Ste#105,Pmb 132,San Diego,CA 92106
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/21/2014
Emphasis: L:Progcon,P:Progcon Close Case: 08/22/2014
Case Status:CLOSED
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington,DC 20210
L 800-321-6742(OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT OCCUPATIONAL SAFETY AND HEALTH ABOUT THE SITE
White House Frequently Asked Questions Freedom of Information Act
Severe Storm and Flood Recovery Assistance A-Z Index Privacy&Security Statement
Disaster Recovery Assistance Freedom of Information Act Disclaimers
DisasterAssistance.gov Read the OSHA Newsletter Important Website Notices
USA.gov Subscribe to the OSHA Newsletter Plug-Ins Used by DOL
No Fear Act Data OSHA Publications Accessibility Statement
U.S.Office of Special Counsel Office of Inspector General
https://www.os ha.gov/pls/im is/establishment.i nspection_detail?id=1399946.015&id=1323735.015&id=1339097.015&id=1325793.015&id=1302815.... 13/13
ff Ice
W. A LYLES CO. Corporate P.O.Box 4377 4377
Fresno,CA 93744-4377
CONTRACTOR Telephone(559)441-1900
SL=1943 Fax(559)487-7958
Progress Through Performance www.wmlyles.com
An Equal Opportunity Employer
California Contractor's License No.422390
Exhibit B
LEGAL,STATUTORY,AND CONTRACTUAL BASIS FOR REJECTING BID
WML includes the following brief summation of legal, statutory and contractor rationale for
rejecting SHIMMICK's bid:
1) Competitive bidding process is not for the protection of SHIMMICK. Universal By-
Products, Inc., v. City of Modesto (1974) 43 Cal.App.3d 145, concerning competitive bidding,
provides that, "The competitive bidding statutes are not intended to be for the benefit of bidders,
but for the benefit and protection of the public";
2) SHIMMICK generally has no legal right to compel acceptance of its bid. "...the call
for bids and the law confer on the awarding authority the duty of exercising its judgment as to
whether it is in the best interests of the public entity to award the contract in question to the lowest
bidder" and "[c]onsequently, the lowest qualified bidder generally has no legal right to compel
acceptance of his or her bid" (Baldwin-Lima-Hamilton Corp. v. Superior Court, 1962, 208
Cal.App.2d 803);
3) SHIMMICK's bid can be rejected on the basis of lack of responsibility. Inglewood-L.A.
County Civic Center Auth. V. Superior Court(1972) 7 Cal.3d 861, a contract must be awarded to
the lowest bidder unless it is found that he is not responsible,i.e.,not qualified to do the particular
work under consideration;
4) Raymond v. Fresno City Unified School Dist. (1954) 123 Cal.App.2d 626,in discussing
the ability of a municipal governments ability to determine responsibility, the court noted "The
term`lowest responsible bidder'has been held to mean the lowest bidder whose offer best responds
in quality,fitness,and capacity to the particular requirements of the proposed work;and that where
by the use of these terms the council has been invested with discretionary power as to which is the
lowest responsible bidder, having regard to the quality and adaptability of the material or article
to the particular requirements of its use, such discretion will not be interfered with by the courts in
the absence of direct averments and proof of fraud."
5) page 1 of the Notice Inviting Bids states that, "The Orange County Sanitation District
reserves the right to reject any or all Bids...."; &
6) California Public Contract Code §1103 defines a "Responsible Bidder" as follows,
".....a bidder who has demonstrated the attribute of trustworthiness, as well as quality, fitness,
capacity, and experience to satisfactorily perform the public works contract."
Statutory and case law are not the only grounds to consider in rejecting SHIMMICK's bid as
OCSD clearly provided for rejecting bids in the specifications for this Project in the Notice Inviting
Bids as set forth above. In summation, OCSD has the legal authority to reject SHIMMICK's bid
and has announced such authority within the specifications for this Project.
Corporate Office: 1210 W.Olive,Fresno,CA 93728
Bakersfield(661)387-1600 Fresno(559)268-1540 Temecula(951)973-7393 1 Rocklin(91 61 375-1833 1 Visalia(559)651-1450
Exhibit C: Page 1 of 4 1N.4 SAN T,TT
W M
O -
2 ` p
ORANGE COUNTY SANITATION DISTRICT
9or�ct,NQ THE ENVPO��W2
NOTICE INVITING BIDS
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
The Orange County Sanitation District (OCSD) invites qualified Bidders to provide Bids for the
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2 Project.
Bid Opening:
The complete Bid shall be submitted in a sealed envelope with the Bidder's name, Project
name, Project number, and the Bid due date and time clearly marked on the envelope. The
envelope must also be clearly marked "Sealed Bid — Do Not Open", and delivered to:
Orange County Sanitation District
Attention: Clerk of the Board
10844 Ellis Avenue
Fountain Valley, CA 92708
Bids shall be submitted at or before 11:00 A.M. (Pacific Time Zone),
Monday, July 29, 2019.
Bids will be publicly read at that time.
Bids submitted via USPS or other courier service must have the Project Name, Project Number,
and the words "Sealed Bid — Do Not Open" clearly marked on the outside of the mailing
envelope. Bidders shall notify Jay Kaura, Contracts Administrator via electronic
telecommunication (email) at construction(cD.ocsd.com of their mailing of the Bid package at
least one day prior to the Bid Opening date.
Bids and/or revisions to Bids received after the date and time specified above will be rejected by
OCSD and returned to the Bidders unopened.
Bids must be prepared and submitted in accordance with the requirements set forth in the
Invitation for Bids (IFB) documents. All Bidders are required to comply with state, federal and
local laws applicable thereto and as directed in the IFB documents.
The Orange County Sanitation District reserves the right to reject any or all Bids and to waive or
not to waive any or all irregularities.
Location & Description of the Work:
The Project is located at Plant 2 at 22212 Brookhurst Street, Huntington Beach, CA 92646. The
Work consists of the removal and replacement of approximately 1,400 linear feet of the
deteriorated Returned Activated Sludge (RAS) piping, valves, valve actuators and associated
wiring, flexible couplings, pipe supports, and the installation of twelve (12) new 14-inch isolation
valves. In addition, concrete repairs will be made by full penetration cracking, by drilling through
the defect, and injecting expanding polyurethane to fill the voids. Finally, existing light poles will
be replaced at the activated sludge basin and secondary clarifiers.
C-NIB-012519
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO.2
Page 1 of 4
Exhibit C: Page 2 of 4
IB-11 ESCROW OF BID DOCUMENTS
Refer to the Special Provisions entitled ESCROW OF BID DOCUMENTS.
IB-12 REQUEST FOR COPIES OF BIDS
Requests for copies of Bids shall be made in writing via electronic telecommunication
(email) at constructionaocsd.com. Electronic copies of bids so requested will be provided
by OCSD within three (3) Business Days of receipt of the request.
IB-13 BID EVALUATION PROCESS
A. General
1. The Bid evaluation period shall close upon OCSD's completion of its review and
evaluation of the Bids. OCSD will give Bidders notice at the completion of Bid
evaluation.
2. During the Bid evaluation period, OCSD shall determine if Bids are Responsive and
Bidders are Responsible. Bids submitted in strict accordance with the IFB
Documents will be deemed Responsive. A Responsible Bidder has the apparent
ability to meet and successfully complete the requirements of the Contract
Documents. Responsibility determination includes, but is not limited to consideration
of a Bidder's trustworthiness, the quality of past performance, financial ability, and
the fitness and capacity to do the proposed Work in a satisfactory manner. Bidder
may be required to present further evidence that it has successfully performed
similar work of comparable magnitude or provide other proof satisfactory to OCSD
that it is competent to successfully perform the Work. In addition to contacting the
references provided by the Bidder, OCSD may, and retains its right to contact other
project owners and such other entities for which Bidder has performed or is
performing work. Determination of the Bidder's responsibility will be judged based on
all of the aforementioned criteria as established by information and documentation
provided by the Bidder in response to instructions and specific questions in the IFB
Documents, including but not limited to the Bid Submittal Forms. If the Bidder is a
Joint Venture, Bidder shall be required to submit information pertaining to its joint
venture partners, as specified in the Bid Submittal Forms.
B. Safety
1. All Safety evaluations will be performed utilizing data that is current at the date and
time of Bid Opening.
2. For purpose of evaluating the Safety record of the Bidder, if the Bidder has any
Serious, Willful, Repeat, Serious and Willful or Failure to Abate citations pursuant to
Part 1 of Division 5 of the Labor Code and has not taken appropriate corrective
action to abate further such violations; or if the Bidder has an accident frequency
factor between 1.01 and 1.25 and has not taken appropriate corrective action to
reduce its accident frequency experience; or if the Bidder has a workers'
compensation experience modification rate issued and published by the Workers'
C-IB-092118
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO.2
Page 7 of 22
Exhibit C: Page 3 of 4
Compensation Insurance Rating Bureau of California (WCIRB) between 1.01 and
1.25 and has not taken appropriate corrective action to reduce its workplace injuries,
illnesses and workers' compensation losses, or if the Bidder does not have injury
prevention programs instituted to the extent required by Section 3201.5 or 6401.7 of
the Labor Code, the Bidder may be deemed Not Responsible and its Bid rejected.
OCSD may require the Bidder to submit evidence of such corrective actions as
described above and as specified in the SAFETY DECLARATION OF
CONTRACTOR located in the Bid Submittal Forms.
3. If the Bidder has an accident frequency factor above 1.25 or a workers'
compensation experience modification rate issued and published by the Workers'
Compensation Insurance Rating Bureau of California (WCIRB) above 1.25, the Bid
shall be deemed Non-Responsive and the Bid rejected.
4. Failure by the two (2) apparent low Bidders to submit a completed Workers'
Compensation Experience Rating Form (also referred to as an Experience Rating
Worksheet) and/or the completed and signed CAL/OSHA 300/300A Logs and
Summaries within three (3) Business Days after the Bid Opening, or provide the
reason(s) for exemption, as required, may result in their Bids being rejected as Non-
Responsive.
Should the two (2) apparent low Bidders fail to meet OCSD's requirements, the next
apparent low Bidder(s) shall be notified to submit the said documentation within the
three (3) Business Day time frame for OCSD review.
5. Accident Frequency Factor
OCSD will evaluate the Bidder's accident frequency factors for each calendar year
submitted on the CAL/OSHA 300/300A Logs and Summaries and its three (3) year
average using the Accident Frequency Factor tables shown below.
Prior to completing Part 5 BID SUBMITTAL FORMS, BF-6 SAFETY DECLARATION
OF CONTRACTOR (Safety Declaration) located in the Bid Submittal Forms, the
Bidder shall calculate its accident frequency factors for each calendar year listed and
its three (3) year average using the Accident Frequency Factor tables below. The
results of those calculations should be used to respond to the Accident Frequency
question on the Declaration.
a) Total Recordable Incident Rate Calculation Table
Using the OSHA Form 300 and 300A logs and the table below, the Total
Recordable Incident Rate (TRIR) is calculated for the past three (3) completed
calendar years and three (3) year average in the table below. (Please see the
California Department of Industrial Relations (DIR) website for more detailed
information)
C-I B-092118
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 8 of 22
Exhibit C: Page 4 of 4
Bid Submitted By:
(Name of Firm)
BF-6 SAFETY DECLARATION OF CONTRACTOR
The CONTRACTOR shall complete this form in its entirety and submit it to OCSD with its Bid in
accordance with the Part 2— Instructions to Bidders section entitled "Bid Evaluation Process".
Prior to submitting its Bid, the CONTRACTOR shall safety pre-qualify each of its
Subcontractors. The CONTRACTOR shall require each of its Subcontractors to complete
Items 5-9 of this form, execute and submit the form to the CONTRACTOR in accordance with
the Part 2—Instructions to Bidders section entitled "Bid Evaluation Process".
CONTRACTOR certifies the following (check the appropriate box):
1. Does the CONTRACTOR have any Serious, Willful, Repeat, Serious and Willful, or Failure
to Abate citations of Part 1 (commencing with Section 6300)of Division 5 of the Labor
Code, during the past five-year period?
❑ No
❑ Yes SHIMMICK checked "Yes" on their bid.
If Yes is checked, OCSD may require the CONTRACTOR to submit evidence of
corrective actions being taken to abate further violations of Part 1 of Division 5 of the Labor
Code.
2. Accident Frequency
OCSD will evaluate the CONTRATOR's accident frequency factors for each calendar year
submitted on the CAL/OSHA 300/300A Logs and Summaries and its three (3)year
average using the Accident Frequency Factor tables as specified in the Instructions to
Bidders.
Prior to completing this Declaration, OCSD recommends that the CONTRACTOR calculate
its accident frequency factors for each calendar year listed and its three (3)year average
using the Accident Frequency Factor tables located in the Instructions to Bidders. The
results of those calculations should be used to answer the following questions:
OCSD requires the CONTRACTOR to have an accident frequency at or below a factor of
1.25 of the national average as published by the California Department of Industrial
Relations (DIR)for the specific North American Industry Classification System (NAICS)
Codes and applied to the accident history of the last three (3)years.
A. Does the CONTRACTOR have an accident frequency at or below a factor of 1.00 of
the state average as published by the DIR for the specific NAICS Codes and applied to
the accident history for the last three (3)years?
❑ Yes
OR
BF-6 SAFETY DECLARATION OF CONTRACTOR C-BF-053119
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO.2
Page 1 of 7
Exhibit D: Page 1 of 4
UNITED STATES
U u ► Find it in 05HA Q
DEPARTMENT OF A:S' is
Occupational Safety and Health Administration English Spanish
OSHA- WORKER- EMPLOYER- STANDARDS- ENFORCEMENT- CONSTRUCTION- TOPIC- NEWS+RESOURCES- DATA- TRAINING-
Establishment Search Results
Establishment Date Range Office Zipcode State
'AJ M.Lyles Co. 07�13112014 to 07131019 all all all
Please rxz1e that irucec6ons whkh an known to be i>1co zte wiC have the idenfi yrng Activity Nr shown in+7a!c.Information for the a open cases is a peciatty dyn nk..e.g.
r4otatihns may be added or deleted
Sort By,Date]Name I Office I State Return to Search 0
By Date Results 1-4 of 4
Get Detail I Seleci All i Reset
# Activity Opened RID St Type Sc SIC NAICS Vio Establishment Name
1 139W5.015 K2412019 0950647 CA FaUCat Partial 238990 1PLPA.Lyles Co-
2 1359663.015 1111a2018 0950647 CA Accident Partial 238990 W.M.Lyles Co.
3 1318186.015 04/3012018 0950633 CA Accident Partial 236220 W M.Lyles Co
i 4 1 1287613.015 01/1212018 10950625 CA Complaint Partial 236220 W.M.Lyles Co
UNITED STATES
DEPARTMENT OF LABOR Exhibit D: Page 2 of 4
OSHA English I Spanish
Find it in OSHA CZ
A TO Z INDEX
OSHA- WORKER - EMPLOYER - STANDARDS - ENFORCEMENT - CONSTRUCTION - TOPIC - NEWS/RESOURCES - DATA - TRAINING -
Inspection Detail
Quick Link Reference
1395805.015 1 1359663.015 1 1318186.015 1 1287613.015
Case Status:OPEN
Note:The following inspection has not been indicated as closed. Please be aware that the information shown may change,e.g.violations may be added
or deleted. For open cases, in which a citation has been issued,the citation information may not be available for 5 days following receipt by the employer
for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1395805.015-W.M.Lyles Co.
Inspection Information-Office:Bakersfield District Office
Nr: 1395805.015 Report ID: 0950647 Open Date:
04/24/2019
W.M.Lyles Co.
Gun Club Rd. &Sherwood Ave. THIS CASE INVOLVES
Union Status: Union A WORKER WHO DIED
Wasco,CA 93280
Wa FROM A HEART ATTACK
ON THE PROJECT SITE-
NAICS: 238990/AII Other Specialty Trade Contractors NOT A SAFETY RELATED
Mailing: P.O. Box 80605, Bakersfield,CA 93380 DEATH
Inspection Type: Fat/Cat
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference:
Close Case:
Related Activity: Type ID Safety Health
Accident 1448752
Case Status:OPEN
Case Status:CLOSED
Inspection: 1359663.015-W.M. Lyles Co.
Inspection Information-Office:Bakersfield District Office
Nr: 1359663.015 Report ID: 0950647 Open Date:
11/13/2018
W.M. Lyles Co.
5545 Harris Rd.
Bakersfield,CA 93313 Union Status: Union
SIC:
NAICS: 238990/AII Other Specialty Trade Contractors
Mailing: P.O. Box 80605,Bakersfield,CA 93380
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/19/2019 Exhibit D: Page 3 of 4
Close Case: 03/19/2019
Related Activity: Type ID Safety Health
Accident 1397511
Case Status:CLOSED
Case Status:CLOSED
Inspection: 1318186.015-W.M. Lyles Co
Inspection Information-Office:Ca San Bernardino
Nr: 1318186.015 Report ID: 0950633 Open Date:
04/30/2018
W. M. Lyles Co
59099 Sunny Slope Drive
Union Status: Union
Yucca Valley,CA 92284
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 42142 Roick Drive,Temecula,CA 92590
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/19/2018
Close Case: 05/14/2019
Related Activity: Type ID Safety Health
Accident 1330732
Case Status:CLOSED
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $0 $0 $0 $750 $0 $750
Current Penalty $0 $0 $0 $0 $0 $0
FfA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
Deleted 1. 01001 Other 1509(A) 10/19/2018 $0 $750 $0 10/26/2018 J-AU Decision
Case Status:CLOSED
Inspection: 1287613.015-W.M.Lyles Co
Inspection Information-Office:Ca Fresno
Nr: 1287613.015 Report ID: 0950625 Open Date:
01/12/2018
W.M. Lyles Co
6395 E. Floradora Avenue Union Status: Union
Fresno,CA 93706
SIC:
NAICS: 236220/Commercial and Institutional Building Construction
Mailing: 315 North Thorne Avenue, Fresno,CA 93706
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private Exhibit D. Page 4 of 4
Safety/Health: Health Close Conference: 06/22/2018
Close Case: 06/28/2018
Related Activity: Type ID Safety Health
Complaint 1299847 Yes
Case Status:CLOSED
UNITED E:D .`ETA i 6
DF:11"ARTMENTOF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
t.800-321-6742(OSHA)
i
TTY
www,OSHA.gov l
{i
FEDERAL GOVERNMENT OCCUPATIONAL SAFETY AND HEALTH ABOUT THE SITE
White House Frequently Asked Questions Freedom of Information Act
Severe Storm and Flood Recovery Assistance A-Z Index Privacy&Security Statement
Disaster Recovery Assistance Freedom of Information Act Disclaimers i
DisasterAssistance.gov Read the OSHA Newsletter Important Website Notices
USA,gov Subscribe to the OSHA Newsletter Plug-Ins Used by DOL
No Fear Act Data OSHA Publications Accessibility Statement
U.S. Office of Special Counsel Office of Inspector General
1
#1
ii
l
i
i
{
I
https://www.osha.gov/pis/imis/establishment.inspection_detail?id=1395805.015&id=1359663.015&id=1318186.015&id=1287613.015 313
8/12/2019 Muni officials to step up background checks on contractors-SFChronicle.com
Exhibit E: Page 1 of 5
:;i+ fi In
Local Sporting Green Politics Biz+Tech US&World Opinion Datebook Food Lifestyle vault: Ar
contractors
Megan Cassidy and Lauren Hernandez
Aug.16,2018 Updated:Aug.16,2018 9:42 p.m.
The Twin Peaks Tunnel
Photo:Jessica Christian/The Chronicle
San Francisco Municipal Transportation Agency officials said Thursday they will beef up
background checks on potential contractors following revelations that a hired
contractor, Shimmick Construction, had a history of safety violations.
The move comes at the direction of Mayor London Breed, less than a week after a signal
technician was killed while working on the construction of the Twin Peaks`funnel.
https://www.sfchronicle.com/bayarea/article/Muni-officials-to-step-up-background-checks-on-13162686.php?t=29d49887c6 1/6
8/12/2019 Muni officials to step up background checks on contractors-SFChronicle.com
Exhibit E: Page 2 of 5
Sign In
Local Sporting Green Politics Biz+Tech US &World Opinion Datebook Food Lifestyle Vault: Ai
Unlimited Digital Access for 954
Read more articles like this by subscribing to the San Francisco Chronicle SUBSCRIBE
Until now, SFMTA officials said their application process counted on potential bidders to
truthfully respond to a prequalification questionnaire.
"The SFMTA uses an industry-wide standard that takes into account their workers'
compensation claims compared to the size of its overall operations," SFMTA spokesman
Paul Rose said in an email. "These contractors represented that they met those
requirements."
Related Stories
L0CAL r,.07
LOCAL
BY SARAH RAVANI BY STEVE RUBENSTEIN BY RACH
Construction worker dies while Muni contractor killed by steel Twin]
working in Twin Peaks Tunnel in beam in Twin Peaks Tunnel... comps
SF shortf
Rose pointed to a pre-bidding document that asked Shimmick Construction officials and
a business partner, "In the past ten years, has the Potential Bidder... been cited for any
serious and willful safety violations by Cal-OSHA?"The company checked the box for
"no."
https://www.sfchronicle.com/bayarea/article/Muni-officials-to-step-up-background-checks-on-13162686.php?t=29d49887c6 2/6
8/12/2019 Muni officials to step up background checks on contractors-5FChronicle.com
Exhibit E: Page 3 of 5
;;i�1ft I i
Local Sporting Green Politics Biz+Tech US&World Opinion Datebook Food Lifestyle Vault: Ar
In one case it's appealing, a Shimmick Construction employee lost control of a forklift in
November 201.6 and died after getting ejected and pinned against a dirt wall, according to
OSHA. Shimmick Construction was cited for six violations — three of which were serious
— resulting in a fine of$48,400.
Records show at least one "serious/willful." violation was upheld by an appeals board
following what Cal/OSHA described as a dangerous excavation in 2011.
Shimmick Construction's history was first reported by the San Francisco Examiner and
NBC Bay Area.
In an email Thursday afternoon, Rose said the department will now start fact-checking
the bidders' safety backgrounds.
"Rather than rely on information from potential contractors, we are taking steps now to
change the policy and ensure that we verify details in the pre-bid documents going
forward," he wrote.
Last Friday, 51-year.-old Patrick Ricketts was struck by a steel beam at the West Portal side
of the 2.3-mile Twin Peaks Tunnel, officials said. Ricketts was pronounced dead at San
Francisco General Hospital.
Ca[/OSHA citations against Shimmick Construction
Nov. 16, 2016: A forklift employee died when he was ejected and pinned between the
vehicle and a wall. Cal/OSHA cited Shimmick for six violations and imposed a$48,400
fine. Shimmick is appealing the case.
July 8, 2015:Ca1/OSHA issued three citations for violations of its Injury and Illness
Prevention Program for construction workers, and imposed a$26,770 fine, which
Shimmick is appealing.
https://www,sfchronicle.com/bayarea/article/Muni-officials-to-step-up-background-checks-on-13162686.php?t=29d49887c6 3/6
8/12/2019 Muni officials to step up background checks on contractors-SFChronicle.com
Exhibit E: Page 4 of 5
Local Sl)ortilig Green Politics Biz+Tech US&World Opinion Datebook Food Lifestyle Vault: Ar
Jan. 12, 201_S: An employee's hand was severely injured during an excavation that
Shimmick and another construction company were working on. Both companies were
cited with two violations and fined $9,450. The case is still open.
Feb. 6,2014:Cal/OSHA issued three citations for violations of a standard that requires
testing and examination of cranes and other hoisting equipment. Shimmick was fined
$2,700 and the case was closed a year later.
May 9, 2012: An employee was severely injured by a pipe, resulting in a citation for a
health and safety violation and a $450 fine. The case closed two years later.
.Jan. 25, 2012: Cal/OSHA imposed a $750 fine for six safety violations by Shimmick and
I
another company in a case that closed more than a year later.
August 2011: Cal/OSFIA fined Shimmick and another company$67,500 for a"willful"
violation of a standard related to a bridge, tunnel, and/or elevated highway construction.
The case closed in 2015.
March 2011: Cal/OSHA fined Shimmick and another company$197,)75 for 14 violations,
including some related to heavy construction and control of hazardous substances. The
case remains open.
Source: Cal/OSHA
Work inside the 100-year-old light rail tunnel was suspended while the accident was
investigated, and resumed the following day. The tunnel has been closed for service
since June 25, and is scheduled to reopen this month.
Rose said SFMTA plans to complete the$41.million project on time, and will continue to j
use Shimmick Construction's services.
i
In a statement released this week, the spokesman for Oakland-based Shimmick
Construction said the company's responses to the city's questionnaire were "accurate,"
and that"safety is core to everything we do."
https:llwww.sfclironicle.com/bayarealarticlelMuni-officials-to-step-up-background-checks-on-13162686.php?t=29d49887c6 416
8/12/2019 Muni officials to step up background checks on contractors-SFChronicle.com
Exhibit E: Page 5 of 5
In
Local Sporting Green Politics Biz+Tech US &World opinion Datebook Food Lifestyle Vault: Ar
Bidding qualification standards in San Francisco may differ by department, but officials
from at least one other city entity said they're also reviewing their policies.
In the San Francisco Public Utilities Commission questionnaire, contractors are required
to sign under penalty of perjury that their answers are true to their knowledge, according
to press secretary Will Reisman.
Reisman said PUC staff review all responses and verify portions of those answers,but
added: "We are currently updating our processes to ensure that all safety answers on the j
I
questionnaire are verified."
The review process began in July, and was not in response to the Muni death, Reisman
said. I
Megan Cassidy and Lauren Hernandez are San Francisco Chronicle staff writers. Email. j
megan.cassidy0sfchronicle.com and lauren.hernandez@sfchronicle.com Twitter:
@meganrcassidy @LaurenPorFavor
TOP i
a
`s
ABOUT 1
our Company Advertising i
Ad Choices Privacy Policy
Careers Your Privacy Rights
Terms of Use Your California Privacy Rights
CONTACT
Customer Service News Tips
i
FAQ Homepage Redesign Feedback
Newsroom Contacts
https;//www.sfchronicle.com/bayarea/article/Muni-officials-to-step-up-background-checks-on-13162686.php?t=2gd49887c6 516
Shimmick Violation Summary Period 8/2014 to 8/2019 EXHIBIT F
Date Status Standard Cited Multiple Violations Penalty Note
2019
5/10/2019 Open Accident No further Information provided
2018
8/27/2018 Closed Other 3203(A)(4)General Industry Accident Prevent Program $ 410.00
8/10/2018 Violation Under Contest Serious 3203(A)(4)General Industry Accident Preven Program $ 25,000.00 Fatality
Serious 4991(A) $ 25,000.00
Serious 8473(A) $ 7,650.00
Serious 8473(A) $ 7,650.00
6/21/2018 Closed Referral
3/20/2018 Violation Under Contest Serious 1509(A)(18B-CA)Construc,Accident Preven Program $ 18,000.00 Fractures to leg tibia and fibula
Serious 4981 C $ 18,000.00
2017
9/11/2017 Closed Planned
7/19/2017 Closed Serious 19260250 A01 General requirements for storage $ 11,408.00 $10,500 penalty paid
7/11/2017 Clsoed Other 19260405 G021V Wiring methods,c components,and equipment for ger $ 4,889.00 $4,889 penalty paid
1/24/2017 Other 5001 E $ 300.00 Fingers amputation
2016
11/21/2016 Violation Under Contest Other 43000029 B01 $ 400.00
other 3650(T)(15) $ 600.00
Other 3650(T)(33) $ 600.00
Serious 3328(A)(2)(18B-CA)Servicing Multi-?Single Piece Wheel Rims $ 14,400.00 Fatality
Serious 3650(T) $ 14,400.00
Serious 3650(T)(11) $ 18,000.00
10/21/2016 Violation Under Contest Serious 296-155-53408(2)(D)(I) $ 4,800.00
Serious 296-155-53401(5)(1) $ -
Other 296-155-53401(5)(A) $ -
Other 296-155-53401(5)(G) $ -
7/29/2016 Closed Planned
4/20/2016 Pending Abatement Other 1511(B) $ 560.00
of Violations Other 5042(A)(9) $ 1,125.00
Serious 3385(A) $ 18,000.00
Serious 49990(1) $ 18,000.00
2015
7/8/2015 Violation Under Contest Serious 1509(A)(18B-CA)Construc,Accident Prevention Program $ 7,650.00
Serious 16160001 NO3 $ 9,560.00
Serious 161600010 $ 9,560.00
5/8/2015 Closed Complaint
4/21/2015 Open Other 1509(A)(18B-CA)Construc,Accident Prevention Program $ 475.00
Serious 1620(A) $ 7,650.00
Serious 1712 C(1) $ 7,650.00
1/30/2015 Open Other 1512(D) $ 450.00
Other 1509(A)(18B-CA)Construc,Accident Prevention Program $ 450.00
Serious 1541(A) $ 9,000.00 Partial finger amputation
2014
8/21/2014 Closed Planned
CSC n"N
General Engineering Contractor
AUGUST 20T", 2019
VIA ELECTRONIC MAIL ONLY
Mr. Jay Kaura
Contracts Administrator
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708
construction@ocsd.com
Re: Return Activated Sludge Pipinq Replacement At Plant No. 2
Project No.: P2-123
Bid Date: July 29, 2019
Low Bidder: Shimmick Construction Company, Inc.
Dear Mr. Kaura:
1. Introduction
This is the response of Shimmick Construction Company, Inc. ("SCCI") to W.M.
Lyles Co.'s ("Lyles") letter dated August 13, 2019 concerning the above Project. Shimmick
is the most responsible low bidder who bid the Project. Lyles' contrary assertions are
without merit because the OSHA citations in support of its protest against SCCI are either
still pending appeal or are open. The remaining OSHA citations, and most serious safety
accidents listed in Lyles' protest were not against SCCI. As detailed in its bid package,
SCCI either has performed or is performing six major contracts worth $219,485,243.00 of
work over the past twelve years for the Orange County Sanitation District ("District").
There have been no OSHA reportable safety incidents on any of those projects. SCCI is a
qualified and responsible bidder for the Project. The District should reject Lyles' protest
and proceed to award the Project to the lowest responsive and responsible bidder: SCCI.
2. Brief Factual Summary
A. Bids Received
On July 29, 2019, the District received bids for the Project. SCCI was the low
bidder by $551,759.65, as detailed in the following table of the top three bidders:
530 Technology Drive Suite 300 .Irvine, CA 92618 . Phone(949) 333-1500 . Fax(949) 333-1510
8201 Edgewater Drive, Suite 202 9 Oakland, CA 94621 9 Phone (510) 777-5000 . Fax (510) 777-5099
SH F
K
CO ION
General Engineering Contractor
Bidder Bid Spread
SCCI $6,042,110.35
Lyles $6,593,870.00 $551,759.65
Kiewit Infrastructure West, $6,843,000.00 $800,889.65
Co.
B. The District's Responsibility Specification
The District included within the Invitation to Bids the following definition of
responsible bidder:
A responsible bidder has the apparent ability to meet and successfully
complete the requirements of the Contract Documents. Responsibility
determination includes, but is not limited to consideration of a Bidder's
trustworthiness, the quality of past performance, financial ability, and the
fitness and capacity to do the proposed work in a satisfactory matter.
(Invitation to Bid, p. 7, § 13-A(2).) Aside from the bidder's safety record, the District would
consider at least five other categories of responsibility.
C. Lyles' Protest
On August 13, 2019, Lyles protested award to SCCI on the basis that SCCI is not a
safe contractor and, therefore, not responsible to perform the work. In support, Lyles
attached an OSHA report detailing various OSHA citations SCCI had received in the last
five years. As detailed below, Lyles' protest is misleading and without merit. The most
serious violations were not attributed to SCCI, but rather joint ventures of which SCCI was
a member. Further, aside from the alleged safety infractions, Lyles does not dispute
SCCI's, "trustworthiness, the quality of [SCCI's] past performance, financial ability, [or
SCCI's] fitness and capacity to do the proposed work in a satisfactory matter," which are
the other categories considered for responsibility. The District should reject Lyles' protest
and award the Project to the lowest responsive and responsible bidder: SCCI.
3. Legal Standard
"A bidder is responsible if it can perform the contract as promised. A bid is
responsive if it promises to do what the bidding instructions require." (MCM Const., Inc. V.
City & Cty. of San Francisco (1998) 66 Cal.App.4th 359, 368, internal citations omitted.)
"In the usual case, the determination that a bid is nonresponsive is not based on disputed
facts, does not involve an exercise of agency discretion, and does not require a hearing for
the excluded bidder." (D.H. Williams Constr., Inc. v. Clovis Unified Sch. Dist. (2007) 146
530 Technology Drive Suite 300 .Irvine, CA 92618 . Phone (949) 333-1500 . Fax (949) 333-1510
8201 Edgewater Drive, Suite 202 . Oakland, CA 94621 . Phone (510) 777-5000 9 Fax (510) 777-5099
SH CK
CO S TION
General Engineering Contractor
Cal.App.4th 757, 764.) However, "[a] determination that a bidder is responsible [or not] is
a complex matter dependent, often, on information received outside the bidding process
and requiring, in many cases, an application of subtle judgment." (Ibid.) "[A]s in most due
process cases, we believe the remedy must permit the agency to properly consider the
issues in a due process hearing, and then to exercise the discretion vested in the agency
by statute." (Ibid.) Public bids:
[M]ust be evaluated from a practical rather than a hypothetical
standpoint, with reference to the factual circumstances of the case.
They must also be viewed in light of the public interest, rather than the
private interest of a disappointed bidder. 'It certainly would amount to a
disservice to the public if a losing bidder were to be permitted to comb
through the bid proposal or license application of the low bidder after
the fact, [and] cancel the low bid on minor technicalities, with the hope
of securing acceptance of his, higher bid. Such construction would be
adverse to the best interests of the public and contrary to public op Ijcy.'
(MCM Const., Inc. v. City & Cty. of San Francisco (1998) 66 Cal.App.4th 359, 370.) There
is no dispute that SCCI's bid is responsive. There should also be no doubt that SCCI is a
responsible bidder. To the extent Lyles maintains the District must reject SCCI's bid on
issues of non-responsibility, SCCI is entitled to a due process hearing before the District to
establish its responsibility. As detailed below, a hearing is not necessary, because SCCI is
a responsible bidder.
4. Lyles' Protest Is Without Merit and Should Be Summarily Rejected
A. Lyles' OSHA Citations Do Not Establish Non-responsibility
OSHA violations are not final unless and until all pending appeals have been
exhausted and a final ruling has been issued on the violation. All of SCCI's OSHA
violations listed in Lyles' protest are either still open or pending appeal. Thus, while SCCI
was required to list the citations in its bid, the underlying violations themselves are still
being contested and thus, cannot be counted against SCCI's safety record. Further, 11 of
the 18 remaining OSHA citations were not cited to SSCI, but rather to firms who were joint
venturers of which SCCI was a member. Since those citations were not against SSCI,
they cannot be counted towards SCCI's safety record. It is noteworthy that those citations
not filed against SCCI include one fatality, a fractured arm and leg, and the partial
amputation referenced in Lyles' protest. Lyles cites to no other objective evidence that
would characterize SCCI as unsafe because that evidence refutes Lyles' accusation. As
SCCI listed in its bid, it has an accident frequency below a factor of 1.00, workers'
compensation EMR below 1.00, and has the requisite injury prevention programs in place.
SCCI is a responsible bidder. The District should reject the misleading and meritless
530 Technology Drive Suite 300 .Irvine, CA 92618 . Phone (949) 333-1500 . Fax(949) 333-1510
8201 Edgewater Drive, Suite 202 . Oakland, CA 94621 . Phone (510) 777-5000 . Fax(510) 777-5099
SH CK
CO TION
General Engineering Contractor
protest of Lyles and award the Project to the lowest responsive and responsible bidder
SCCI.
B. California Will Defer to the District's Discretion to Award to SCCI
Although Lyles' protest should be summarily rejected, it is noteworthy that any
challenge to the District's decision to award to SCCI will fail. That is because California
law affords vast discretion to awarding agencies in competitive bids. The review of agency
decisions is "limited to an examination of the proceedings to determine whether
the [District's] actions were arbitrary, capricious, entirely lacking in evidentiary support or
inconsistent with proper procedure. There is a presumption that the [District's] actions were
supported by substantial evidence, and [petitioner/plaintiff] has the burden of proving
otherwise. [Courts] may not reweigh the evidence and must view it in the light most
favorable to the [District's] actions, indulging all reasonable inferences in support of those
actions." (Bay Cities Paving & Grading, Inc. v. City of San Leandro (2014) 223
Cal.App.4th 1181, 1187.) Here, SCCI is the lowest bidder. SCCI has been determined
responsible on every District project it has ever worked on. That is why SCCI has
performed or is performing $219,485,243.00 of work with the District. Doubtless, SCCI is a
responsible bidder. The District should reject the meritless protest of Lyles and award the
Project to the lowest responsive and responsible bidder: SCCI.
5. Conclusion
It is undisputed SCCI submitted a responsive bid. SCCI a responsible bidder.
Lyles wrongly references nonbinding OSHA citations—most of which were not cited to
SCCI—to support its self-serving protest. Public bids "must be evaluated from a practical
rather than a hypothetical standpoint, with reference to the factual circumstances of the
case. They must also be viewed in light of the public interest, rather than the private
interest of a disappointed bidder." (MCM Const., Inc. v. City & Cty. of San Francisco
(1998) 66 Cal.App.4th 359, 370.) Here, SCCI complied with the bid documents and
submitted the lowest bid. Lyles' bid protest is without merit and against public policy. The
District should reject Lyles' protest and award the Project to the lowest responsive and
responsible bidder: SCCI. Please contact us with any questions and please notify us of
any response from Lyles and/or public hearing for consideration of this matter. Thank you.
Sincerely,
Brad Fales
Deputy Director, Electrical Division
530 Technology Drive Suite 300 .Irvine, CA 92618 . Phone (949) 333-1500 . Fax (949) 333-1510
8201 Edgewater Drive, Suite 202 9 Oakland, CA 94621 9 Phone (510) 777-5000 . Fax (510) 777-5099
Serving: Orange County Sanitation District
Anaheim 10844 Ellis Avenue,Fountain Valley,CA 92708
714.962.2411 • www.ocsd.com
Brea
Buena Park August 23, 2019 Via Email: psaleen@wmlylesco.com
Cypress & overnight mail
Fountain Valley Robert P. Saleen
W.M. Lyles Co.
Fullerton 1210 West Olive Avenue
Fresno, CA 93728
Garden Grove
Huntington Beach SUBJECT: OCSD Response to W.M. Lyles Co.'s Award Protest
Irvine Re: Project No. P2-123, Return Activated Sludge Piping
Replacement at Plant No. 2
La Habra
La Palma This letter serves as the Orange County Sanitation District's ("OSCD") response to
Los Alamitos the Award Protest Statement ("Protest") filed by W.M. Lyles Co. ("W.M. Lyles") on
August 13, 2019. The Protest challenges the recommendation that OCSD award
Newport Beach the contract for the above-referenced project (the "Contract") to Shimmick
Construction Company, Inc. ("Shimmick").
Orange
W.M. Lyles alleges that Shimmick is not a responsible and/or qualified contractor
Placentia due to Shimmick's past safety violations. W.M. Lyles cites various OSHA Reports
Santa Ana and accidents occurring on Shimmick projects to support this assertion. W.M. Lyles
contends that Shimmick's purported inability to maintain safe work sites indicates
Seal Beach that Shimmick is not a responsible bidder within the meaning of the California Public
Contract Code ("PCC"), so OCSD should reject Shimmick's bid. W.M. Lyles further
Stanton asserts that the requested disqualification would comport with sound public policy.
Tustin OCSD has reviewed the Protest and all necessary facts and written materials
Villa Park submitted, including the Protest response letter received from Shimmick on August
20, 2019, and hereby denies the relief requested based on the following:
County of Orange
Costa Mesa Bidder Responsibility
Sanitary District
Under California's competitive bidding laws, public agencies must award a public
Midway City works contract to the lowest bidder unless the agency finds the bidder is non-
Sanitary District responsible. (City of Inglewood-L.A. Cnty. Civic CenterAuth. v. Superior Ct. (1972)
Irvine Ranch 7 Cal.3d 861, 867.) The PCC defines a responsible bidder as "a bidder who has
Water District demonstrated the attribute of trustworthiness, as well as quality, fitness, capacity,
and experience to satisfactorily perform the public works contract." (PCC § 1103.)
Yorba Linda
Water District Determining whether a bidder is responsible is "a complex matter dependent, often,
on information received outside the bidding process and requiring, in many cases,
o SA,,,r„o/ the application of subtle judgment." (Taylor Bus Service, Inc. v. San Diego Bd. of
Educ. (1987) 195 Cal.App.3d 1331, 1341-42.) Moreover, agencies may not employ
concepts of relative superiority when making this responsibility determination.
(Great West Contractors, Inc. v. Irvine Unified School Dist. (2010) 187 Cal.App.4th
�- - �- 1425, 1452.) A low bidder may not be deemed non-responsible simply because
�J '1 another bidder is more qualified or more responsible.
Our Mission: To protect public health and the environment by
providing effective wastewater collection, treatment, and recycling.
O�J�j v SAW Tg r/o'Y
2 O�
Q 9
t ci
-o ti
cr/N� THE EN��QO
Robert P. Saleen
Page 2of3
August 23, 2019
Shimmick is a Responsible Bidder
The Protest urges OCSD to find Shimmick non-responsible due to various accidents
and safety incidents occurring on Shimmick projects. For the reasons stated below,
OCSD believes these incidents provide an insufficient basis for finding Shimmick
unable to satisfactorily perform this project.
First, many of the incidents cited in the Protest are not considered final for legal or
administrative purposes as they are still open or pending appeal. In order to afford
bidders full due process protections and allow the OSHA investigation and
enforcement process to run its course, OCSD typically does not consider such
incidents when evaluating a bidder's safety qualifications.
Second, several of the incidents identified in the Protest were not cited against
Shimmick specifically, but rather against several of Shimmick's partners on joint
venture projects. OCSD believes it is inappropriate to attribute these incidents to
Shimmick without additional information.
Third, OCSD believes that the PCC and public policy behind California's competitive
bidding laws prohibit public agencies from finding a bidder non-responsible for
safety reasons unless the bidder demonstrates a clear and consistent pattern of
significant safety violations or an inability to take appropriate safety precautions.
This is especially true where, as here, the bidder meets the minimum safety
qualifications of the IFB. Based on our review of the facts presented and OCSD's
own investigation of these matters, OCSD does not believe the incidents cited by
W.M. Lyles meet this high standard.
Simply put, the fact that a large contractor like Shimmick has had safety incidents in
the past is not sufficient justification to find the contractor non-responsible. To be
sure, a contractor's repeated failure to proactively address safety concerns may
indicate that the bidder is not responsible, but OCSD does not find this to be the
case here. OCSD has investigated the corrective actions taken by Shimmick
following the violations cited in Shimmick's bid and finds these corrective actions
acceptable. Moreover, Shimmick's accident frequency rate is below the industry
average and OCSD has not encountered significant safety concerns on other OCSD
projects performed by Shimmick.
For all these reasons, OCSD does not believe that Shimmick's past safety violations
and performance history warrant a finding of non-responsibility for this project.
4�JNSv SANI TqT Oy
i
= 9
Q
� \ n
0
90r ��2
FCr'NC THE EN�QQ, Robert P. Saleen
Page 3 of 3
August 23, 2019
Determination
OCSD has reviewed the Protest and all accompanying facts and documents and
finds that Shimmick is a responsible bidder for the above-referenced project.
Accordingly, OCSD respectfully rejects W.M. Lyles' Protest.
OCSD will proceed to recommend award of the Contract to the lowest responsive
and responsible bidder, Shimmick Construction Company, Inc., at the Board of
Directors Meeting on September 25, 2019.
Tb
Ruth Zintzun
Contracts & Purchasing Manager
Se►ving: Orange County Sanitation District
Anaheim 10844 Ellis Avenue, Fountain Valley,CA 92708
714.962.2411 • www.ocsd.com
Brea
Buena Park August 8, 2019 Via Email: psaleen@wmlylesco.com
& Overnight Mail
Cypress
Fountain Valley Robert P. Saleen, Senior Vice President
Fullerton W.M. Lyles Co.
1210 W. Olive Avenue
Garden Grove Fresno, CA 93728
Huntington Beach
SUBJECT: Award Recommendation Notice
Irvine Re: Project No. P2-123
La Habra Return Activated Sludge Piping Replacement at Plant No. 2
La Palma
The Orange County Sanitation District (OCSD) completed its evaluation of the Bids
Los Alamitos submitted in response to the Invitation for Bids for the above-referenced Project.
Newport Beach The lowest responsive, responsible Bidder is Shimmick Construction Co., Inc.
Orange Staff's recommendation for Contract award will be included as an item on OCSD's
Operations Committee agenda.
Placentia
Santa Ana The Operations Committee Meeting is scheduled for:
Seal Beach Date: September 4, 2019
Time: 5:00 p.m. (Pacific Time Zone)
Stanton Location: Orange County Sanitation District
Board Room, Administration Building
Tustin 10844 Ellis Avenue
Villa Park Fountain Valley, CA 92708
County of orange If approved by the Operations Committee, the award recommendation will be
forwarded to OCSD's Board of Directors for Contract award.
Costa Mesa
Sanitary District The Board of Directors Meeting is scheduled for:
Midway City Date: September 25, 2019
Sanitary District
Time: 6:00 p.m. (Pacific Time Zone)
Irvine Ranch Location: Orange County Sanitation District
Water District Board Room, Administration Building
10844 Ellis Avenue
Yorba Linda Fountain Valley, CA 92708
Water District
'04O
i r
I 9
9�'^c oaa�a Revision 110218
THE E"��Q Our Mission: To protect public health and the environment by
providing effective wastewater collection, treatment, and recycling.
4OJNtY SANITgTO"
V N�
2 y
Q
¢ e
O -
THE ENv`QOa Robert P. Saleen
Page 2
August 8, 2019
The Final Agenda Report will be posted not less than 72 hours prior to the Board of
Directors and/or Operations Committee Meeting. Should you wish to determine if
the item has been placed on the agenda, please contact the Clerk of the Board at
(714) 593-7433.
.l
Jay Kaur/a
Contracts Administrator
JSK:ms
cc: K. Millea, R. Leon, Y. Dake, K. Lore, N. Dubrovski, Contract file 2.7
Revision 110218
PART A
CONTRACT AGREEMENT
C-CA-022619
TABLE OF CONTENTS
CONTRACT AGREEMENT
SECTION - 1 GENERAL CONDITIONS..................................................................1
SECTION - 2 MATERIALS AND LABOR.................................................................4
SECTION - 3 PROJECT..........................................................................................4
SECTION -4 PLANS AND SPECIFICATONS ........................................................5
SECTION - 5 TIME OF COMMENCEMENT AND COMPLETION ..........................5
SECTION - 6 TIME IS OF THE ESSENCE .............................................................5
SECTION - 7 EXCUSABLE DELAYS......................................................................6
SECTION - 8 EXTRA WORK...................................................................................6
SECTION - 9 CHANGES IN PROJECT...................................................................7
SECTION - 10 LIQUIDATED DAMAGES FOR DELAY.............................................7
SECTION - 11 CONTRACT PRICE AND METHOD OF PAYMENT .........................7
SECTION - 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF
FUNDS ..............................................................................................9
SECTION - 13 COMPLETION................................................................................. 10
SECTION - 14 CONTRACTOR'S EMPLOYEES COMPENSATION....................... 10
SECTION - 15 SURETY BONDS ............................................................................ 12
SECTION - 16 INSURANCE.................................................................................... 13
SECTION - 17 RISK AND INDEMNIFICATION.......................................................22
SECTION - 18 TERMINATION................................................................................22
SECTION - 19 WARRANTY....................................................................................23
SECTION - 20 ASSIGNMENT.................................................................................24
SECTION - 21 RESOLUTION OF DISPUTES ........................................................24
SECTION - 22 SAFETY & HEALTH ........................................................................24
SECTION - 23 NOTICES.........................................................................................25
C-CA-022619
CONTRACT AGREEMENT
ORANGE COUNTY SANITATION DISTRICT
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
THIS AGREEMENT is made and entered into, to be effective, this September 25, 2019, by and
between Shimmick Construction Co., Inc., hereinafter referred to as "CONTRACTOR" and the
Orange County Sanitation District, hereinafter referred to as "OCSD".
WITNESSETH
That for and in consideration of the promises and agreements hereinafter made and exchanged,
OCSD and CONTRACTOR agree as follows:
SECTION — 1 GENERAL CONDITIONS
CONTRACTOR certifies and agrees that all the terms, conditions and obligations of the
Contract Documents as hereinafter defined, the location of the job site, and the conditions under
which the Work is to be performed have been thoroughly reviewed, and enters into this Contract
based upon CONTRACTOR's investigation of all such matters and is in no way relying upon
any opinions or representations of OCSD. It is agreed that this Contract represents the entire
agreement. It is further agreed that the Contract Documents are each incorporated into this
Contract by reference, with the same force and effect as if the same were set forth at length
herein, and that CONTRACTOR and its Subcontractors, if any, will be and are bound by any
and all of said Contract Documents insofar as they relate in any part or in any way, directly or
indirectly, to the Work covered by this Contract.
A. Contract Documents Order of Precedence
"Contract Documents" refers to those documents identified in the definition of"Contract
Documents" in the General Conditions— Definitions.
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 1 of 26
1. In the event of a conflict between one Contract Document and any of the other
Contract Documents, the provisions in the document highest in precedence shall be
controlling. The order of precedence of the Contract Documents is as follows:
a. Supplemental Agreements—the last in time being the first in precedence
b. Addenda issued prior to opening of Bids —the last in time being the first in
precedence
c. Contract Agreement
d. Permits and other regulatory requirements
e. Special Provisions
f. General Conditions (GC)
g. Notice Inviting Bids and Instruction to Bidders
h. Geotechnical Baseline Report (GBR), if attached as a Contract Document
i. Plans and Specifications — in these documents the order of precedence shall be:
i. Specifications (Divisions 01-17)
ii. Plans
iii. General Requirements (GR)
iv. Standard Drawings and Typical Details
j. CONTRACTOR's Bid
2. In the event of a conflict between terms within an individual Contract Document, the
conflict shall be resolved by applying the following principles as appears applicable:
a. Figured dimensions on the Contract Documents shall govern. Dimensions not
specified shall be as directed by the ENGINEER. Details not shown or
specified shall be the same as similar parts that are shown or specified, or as
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 2 of 26
directed. Full-size details shall take precedence over scale Drawings as to
shape and details of construction. Specifications shall govern as to material
and workmanship.
b. The Contract Documents calling for the higher quality material or workmanship
shall prevail. Materials or Work described in words, which so applied, have a
well known technical or trade meaning shall be deemed to refer to such
recognized standards. In the event of any discrepancy between any Drawings
and the figures thereon, the figures shall be taken as correct.
C. Scale Drawings, full-size details, and Specifications are intended to be fully
complementary and to agree. Should any discrepancy between Contract
Documents come to the CONTRACTOR's attention, or should an error occur in
the efforts of others, which affect the Work, the CONTRACTOR shall notify the
ENGINEER, in writing, at once. In the event any doubts or questions arise with
respect to the true meaning of the Contract Documents, reference shall be
made to the ENGINEER whose written decision shall be final. If the
CONTRACTOR proceeds with the Work affected without written instructions
from the ENGINEER, the CONTRACTOR shall be fully responsible for any
resultant damage or defect.
d. Anything mentioned in the Specifications and not indicated in the Plans, or
indicated in the Plans and not mentioned in the Specifications, shall be of like
effect as if indicated and mentioned in both. In case of discrepancy in the
Plans or Specifications, the matter shall be immediately submitted to OCSD's
ENGINEER, without whose decision CONTRACTOR shall not adjust said
discrepancy save only at CONTRACTOR's own risk and expense. The
decision of the ENGINEER shall be final.
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 3 of 26
In all matters relating to the acceptability of material, machinery or plant equipment;
classifications of material or Work; the proper execution, progress or sequence of the
Work; and quantities interpretation of the Contract Documents, the decision of the
ENGINEER shall be final and binding, and shall be a condition precedent to any payment
under the Contract, unless otherwise ordered by the Board of Directors.
B. Definitions
Capitalized terms used in this Contract are defined in the General Conditions, Definitions.
Additional terms may be defined in the Special Provisions.
SECTION — 2 MATERIALS AND LABOR
CONTRACTOR shall furnish, under the conditions expressed in the Plans and Specifications, at
CONTRACTOR'S own expense, all labor and materials necessary, except such as are
mentioned in the Specifications to be furnished by OCSD, to construct and complete the
Project, in good workmanlike and substantial order. If CONTRACTOR fails to pay for labor or
materials when due, OCSD may settle such claims by making demand upon the Surety to this
Contract. In the event of the failure or refusal of the Surety to satisfy said claims, OCSD may
settle them directly and deduct the amount of payments from the Contract Price and any
amounts due to CONTRACTOR. In the event OCSD receives a stop payment notice from any
laborer or material supplier alleging non-payment by CONTRACTOR, OCSD shall be entitled to
deduct all of its costs and expenses incurred relating thereto, including but not limited to
administrative and legal fees.
SECTION — 3 PROJECT
The Project is described as:
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 4 of 26
SECTION —4 PLANS AND SPECIFICATONS
The Work to be done is shown in a set of Plans and Specifications entitled:
PROJECT NO. 132-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Said Plans and Specifications and any revision, amendments and addenda thereto are attached
hereto and incorporated herein as part of this Contract and referred to by reference.
SECTION — 5 TIME OF COMMENCEMENT AND COMPLETION
CONTRACTOR agrees to commence the Project within 15 calendar days from the date set forth
in the "Notice to Proceed" sent by OCSD, unless otherwise specified therein and shall diligently
prosecute the Work to completion within six hundred forty-four (644) calendar days from the
date of the "Notice to Proceed" issued by OCSD, excluding delays caused or authorized by
OCSD as set forth in Sections 7, 8, and 9 hereof, and applicable provisions in the General
Conditions. The time for completion includes fifteen (15) calendar days determined by OCSD
likely to be inclement weather when CONTRACTOR will be unable to work.
SECTION — 6 TIME IS OF THE ESSENCE
Time is of the essence of this Contract. As required by the Contract Documents,
CONTRACTOR shall prepare and obtain approval of all shop drawings, details and samples,
and do all other things necessary and incidental to the prosecution of CONTRACTOR's Work in
conformance with an approved construction progress schedule. CONTRACTOR shall
coordinate the Work covered by this Contract with that of all other contractors, subcontractors
and of OCSD, in a manner that will facilitate the efficient completion of the entire Work and
accomplish the required milestone(s), if any, by the applicable deadline(s) in accordance with
Section 5 herein. OCSD shall have the right to assert complete control of the premises on
which the Work is to be performed and shall have the right to decide the time or order in which
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 5 of 26
the various portions of the Work shall be installed or the priority of the work of subcontractors,
and, in general, all matters representing the timely and orderly conduct of the Work of
CONTRACTOR on the premises.
SECTION — 7 EXCUSABLE DELAYS
CONTRACTOR shall only be excused for any delay in the prosecution or completion of the
Project as specifically provided in General Conditions, "Extensions for Delay", and the General
Requirements, "By CONTRACTOR or Others — Unknown Utilities during Contract Work".
Extensions of time and extra compensation arising from such excusable delays will be
determined in accordance with the General Conditions, "Extension of Time for Delay" and
"Contract Price Adjustments and Payments", and extensions of time and extra compensation as
a result of incurring undisclosed utilities will be determined in accordance with General
Requirements, "By CONTRACTOR or Others — Unknown Utilities during Contract Work".
OCSD's decision will be conclusive on all parties to this Contract.
SECTION — 8 EXTRA WORK
The Contract Price as set forth in Section 11, includes compensation for all Work performed by
CONTRACTOR, unless CONTRACTOR obtains a Change Order signed by a designated
representative of OCSD specifying the exact nature of the Extra Work and the amount of extra
compensation to be paid all as more particularly set forth in Section 9 hereof and the General
Conditions, "Request for Change (Changes at CONTRACTOR's Request)", "OWNER Initiated
Changes", and "Contract Price Adjustments and Payments".
In the event a Change Order is issued by OCSD pursuant to the Contract Documents, OCSD
shall extend the time fixed in Section 5 for completion of the Project by the number of days, if
any, reasonably required for CONTRACTOR to perform the Extra Work, as determined by
OCSD's ENGINEER. The decision of the ENGINEER shall be final.
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 6 of 26
SECTION — 9 CHANGES IN PROJECT
OCSD may at any time, without notice to any Surety, by Change Order, make any changes in
the Work within the general scope of the Contract Document, including but not limited to
changes:
1. In the Specifications (including Drawings and designs);
2. In the time, method or manner of performance of the Work;
3. In OCSD-furnished facilities, equipment, materials, services or site; or
4. Directing acceleration in the performance of the Work.
No change of period of performance or Contract Price, or any other change in the Contract
Documents, shall be binding until the Contract is modified by a fully executed Change Order.
All Change Orders shall be issued in accordance with the requirements set forth in the General
Conditions, "Request for Change (Changes at CONTRACTOR's Request)" and "OWNER
Initiated Changes".
SECTION — 10 LIQUIDATED DAMAGES FOR DELAY
Liquidated Damages shall be payable in the amounts and upon the occurrence of such events
or failure to meet such requirements or deadlines as provided in the Special Provisions,
"Liquidated Damages and Incentives."
SECTION — 11 CONTRACT PRICE AND METHOD OF PAYMENT
A. OCSD agrees to pay and the CONTRACTOR agrees to accept as full consideration for the
faithful performance of this Contract, subject to any additions or deductions as provided in
approved Change Orders, the sum of Six Million Forty-Two Thousand One Hundred Ten
Dollars and Thirty-Five Cents ($6,042,110.35) as itemized on the Attached Exhibit "A".
Upon satisfaction of the conditions precedent to payment set forth in the General
Requirements, Additional General Requirements and General Conditions (including but
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 7 of 26
not limited to Sections entitled "Mobilization Payment Requirements" and "Payment
Itemized Breakdown of Contract Lump Sum Prices"), there shall be paid to the
CONTRACTOR an initial Net Progress Payment for mobilization. OCSD shall issue at the
commencement of the job a schedule which shows:
1. A minimum of one payment to be made to the CONTRACTOR for each successive
four (4) week period as the Work progresses, and
2. The due dates for the CONTRACTOR to submit requests for payment to meet the
payment schedule.
After the initial Net Progress Payment, and provided the CONTRACTOR submits the
request for payment prior to the end of the day required to meet the payment schedule,
the CONTRACTOR shall be paid a Net Progress Payment on the corresponding monthly
payment date set forth in the schedule.
Payments shall be made on demands drawn in the manner required by law, accompanied
by a certificate signed by the ENGINEER, stating that the Work for which payment is
demanded has been performed in accordance with the terms of the Contract Documents,
and that the amount stated in the certificate is due under the terms of the Contract.
Payment applications shall also be accompanied with all documentation, records, and
releases as required by the Contract, Exhibit A, Schedule of Prices, and General
Conditions, "Payment for Work— General". The Total amount of Progress Payments shall
not exceed the actual value of the Work completed as certified by OCSD's ENGINEER.
The processing of payments shall not be considered as an acceptance of any part of the
Work.
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 8 of 26
B. As used in this Section, the following defined terms shall have the following meanings:
1. "Net Progress Payment" means a sum equal to the Progress Payment less the
Retention Amount and other qualified deductions (Liquidated Damages, stop
payment notices, etc.).
2. "Progress Payment" means a sum equal to:
a. the value of the actual Work completed since the commencement of the Work
as determined by OCSD;
b. plus the value of material suitably stored at the worksite, treatment plant or
approved storage yards subject to or under the control of OCSD since the
commencement of the Work as determined by OCSD;
C. less all previous Net Progress Payments;
d. less all amounts of previously qualified deductions;
e. less all amounts previously retained as Retention Amounts.
3. "Retention Amount" for each Progress Payment means the percentage of each
Progress Payment to be retained by OCSD to assure satisfactory completion of the
Contract. The amount to be retained from each Progress Payment shall be
determined as provided in the General Conditions—"Retained Funds; Substitution of
Securities."
SECTION — 12 SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION OF FUNDS
Pursuant to Public Contract Code Section 22300 et seq., the CONTRACTOR may, at its sole
expense, substitute securities as provided in General Conditions — "Retained Funds;
Substitution of Securities."
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 9 of 26
SECTION — 13 COMPLETION
Final Completion and Final Acceptance shall occur at the time and in the manner specified in the
General Conditions, "Final Acceptance and Final Completion", "Final Payment" and Exhibit A-
Schedule of Prices.
Upon receipt of all documentation, records, and releases as required by the Contract from the
CONTRACTOR, OCSD shall proceed with the Final Acceptance as specified in General
Conditions.
SECTION — 14 CONTRACTOR'S EMPLOYEES COMPENSATION
A. Davis-Bacon Act:
CONTRACTOR will pay and will require all Subcontractors to pay all employees on said
Project a salary or wage at least equal to the prevailing rate of per diem wages as
determined by the Secretary of Labor in accordance with the Davis-Bacon Act for each craft
or type of worker needed to perform the Contract. The provisions of the Davis-Bacon Act
shall apply only if the Contract is in excess of Two Thousand Dollars ($2,000.00) and when
twenty-five percent (25%) or more of the Contract is funded by federal assistance. If the
aforesaid conditions are met, a copy of the provisions of the Davis-Bacon Act to be complied
with are incorporated herein as a part of this Contract and referred to by reference.
B. General Prevailing Rate:
OCSD has been advised by the State of California Director of Industrial Relations of its
determination of the general prevailing rate of per diem wages and the general prevailing
rate for legal holiday and overtime Work in the locality in which the Work is to be
performed for each craft or type of Work needed to execute this Contract, and copies of
the same are on file in the Office of the ENGINEER of OCSD. The CONTRACTOR
agrees that not less than said prevailing rates shall be paid to workers employed on this
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 10 of 26
public works Contract as required by Labor Code Section 1774 of the State of California.
Per California Labor Code 1773.2, OCSD will have on file copies of the prevailing rate of
per diem wages at its principal office and at each job site, which shall be made available to
any interested party upon request.
C. Forfeiture for Violation:
CONTRACTOR shall, as a penalty to OCSD, forfeit Two Hundred Dollars ($200.00) for
each calendar day or portion thereof for each worker paid (either by the CONTRACTOR or
any Subcontractor under it) less than the prevailing rate of per diem wages as set by the
Director of Industrial Relations, in accordance with Sections 1770-1780 of the California
Labor Code for the Work provided for in this Contract, all in accordance with Section 1775
of the Labor Code of the State of California.
D. Apprentices:
Sections 1777.5, 1777.6, 1777.7 of the Labor Code of the State of California, regarding
the employment of apprentices are applicable to this Contract and the CONTRACTOR
shall comply therewith if the prime contract involves Thirty Thousand Dollars ($30,000.00)
or more.
E. Workday:
In the performance of this Contract, not more than eight (8) hours shall constitute a day's
work, and the CONTRACTOR shall not require more than eight (8) hours of labor in a day
from any person employed by him hereunder except as provided in paragraph (B) above.
CONTRACTOR shall conform to Article 3, Chapter 1, Part 7 (Section 1810 et seq.) of the
Labor Code of the State of California and shall forfeit to OCSD as a penalty, the sum of
Twenty-five Dollars ($25.00) for each worker employed in the execution of this Contract by
CONTRACTOR or any Subcontractor for each calendar day during which any worker is
required or permitted to labor more than eight (8) hours in any one calendar day and forty
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 11 of 26
(40) hours in any one week in violation of said Article. CONTRACTOR shall keep an
accurate record showing the name and actual hours worked each calendar day and each
calendar week by each worker employed by CONTRACTOR in connection with the
Project.
F. Registration; Record of Wages; Inspection:
CONTRACTOR shall comply with the registration requirements of Labor Code Section 1725.5.
Pursuant to Labor Code Section 1771.4, the Work is subject to compliance monitoring by the
California Department of Industrial Relations. CONTRACTOR shall maintain accurate payroll
records and shall submit payroll records to the Labor Commissioner pursuant to Labor Code
Section 1771.4(a)(3). Penalties for non-compliance with the requirements of Section 1776 may
be deducted from progress payments per Section 1776.
CONTRACTOR shall comply with the job site notices posting requirements established by
the Labor Commissioner per Title 8, California Code of Regulations Section 16461(e).
SECTION — 15 SURETY BONDS
CONTRACTOR shall, before entering upon the performance of this Contract, furnish Bonds
approved by OCSD's General Counsel —one in the amount of one hundred percent (100%) of
the Contract amount, to guarantee the faithful performance of the Work, and the other in the
amount of one hundred percent (100%) of the Contract amount to guarantee payment of all
claims for labor and materials furnished. As changes to the Contract occur via approved
Change Orders, the CONTRACTOR shall assure that the amounts of the Bonds are adjusted to
maintain 100% of the Contract Price. This Contract shall not become effective until such Bonds
are supplied to and approved by OCSD. Bonds must be issued by a Surety authorized by the
State Insurance Commissioner to do business in California. The Performance Bond shall
remain in full force and effect through the warranty period, as specified in Section 19 below. All
Bonds required to be submitted relating to this Contract must comply with California Code of
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 12 of 26
Civil Procedure Section 995.630. Each Bond shall be executed in the name of the Surety
insurer under penalty of perjury, or the fact of execution of each Bond shall be duly
acknowledged before an officer authorized to take and certify acknowledgments, and either one
of the following conditions shall be satisfied:
A. A copy of the transcript or record of the unrevoked appointment, power of attorney, by-
laws, or other instrument, duly certified by the proper authority and attested by the seal of
the insurer entitling or authorizing the person who executed the Bond to do so for and on
behalf of the insurer, is on file in the Office of the County Clerk of the County of Orange; or
B. A copy of a valid power of attorney is attached to the Bond.
SECTION — 16 INSURANCE
CONTRACTOR shall purchase and maintain, for the duration of the Contract, insurance against
claims for injuries to persons, or damages to property which may arise from or in connection
with the performance of the Work hereunder, and the results of that Work by CONTRACTOR,
its agents, representatives, employees, or Subcontractors, in amounts equal to the
requirements set forth below. CONTRACTOR shall not commence Work under this Contract
until all insurance required under this Section is obtained in a form acceptable to OCSD, nor
shall CONTRACTOR allow any Subcontractor to commence Work on a subcontract until all
insurance required of the Subcontractor has been obtained. CONTRACTOR shall maintain all
of the foregoing insurance coverages in force through the point at which the Work under this
Contract is fully completed and accepted by OCSD pursuant to the provisions of the General
Conditions, "Final Acceptance and Final Completion". Furthermore, CONTRACTOR shall
maintain all of the foregoing insurance coverages in full force and effect throughout the warranty
period, commencing on the date of Final Acceptance. The requirement for carrying the
foregoing insurance shall not derogate from the provisions for indemnification of OCSD by
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 13 of 26
CONTRACTOR under Section 17 of this Contract. Notwithstanding nor diminishing the
obligations of CONTRACTOR with respect to the foregoing, CONTRACTOR shall subscribe for
and maintain in full force and effect during the life of this Contract, inclusive of all changes to the
Contract Documents made in accordance with the provisions of the General Conditions,
"Request for Change (Changes at CONTRACTOR's Request)" and/or"OWNER Initiated
Changes", the following insurance in amounts not less than the amounts specified. OCSD
reserves the right to amend the required limits of insurance commensurate with the
CONTRACTOR's risk at any time during the course of the Project. No vehicles may enter
OCSD premises/worksite without possessing the required insurance coverage.
CONTRACTOR's insurance shall also comply with all insurance requirements prescribed by
agencies from whom permits shall be obtained for the Work and any other third parties from
whom third party agreements are necessary to perform the Work (collectively, the "Third
Parties"), The Special Provisions may list such requirements and sample forms and
requirements from such Third Parties may be included in an attachment to the General
Requirements. CONTRACTOR bears the responsibility to discover and comply with all
requirements of Third Parties, including meeting specific insurance requirements, that are
necessary for the complete performance of the Work. To the extent there is a conflict between
the Third Parties' insurance requirements and those set forth by OCSD herein, the
requirement(s) providing the more protective coverage for both OSCD and the Third Parties
shall control and be purchased and maintained by CONTRACTOR.
A. Limits of Insurance
1. General Liability: Seven Million Dollars ($7,000,000) per occurrence and a general
aggregate limit of Seven Million Dollars ($7,000,000) for bodily injury, personal injury
and property damage. Coverage shall include each of the following:
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 14 of 26
a. Premises-Operations.
b. Products and Completed Operations, with limits of at least Seven Million
Dollars ($7,000,000) per occurrence and a general aggregate limit of Seven
Million Dollars ($7,000,000) which shall be in effect at all times during the
warranty period set forth in the Warranty section herein, and as set forth in the
General Conditions, "Warranty (CONTRACTOR's Guarantee)", plus any
additional extension or continuation of time to said warranty period that may be
required or authorized by said provisions.
C. Broad Form Property Damage, expressly including damage arising out of
explosion, collapse, or underground damage.
d. Contractual Liability, expressly including the indemnity provisions assumed
under this Contract.
e. Separation of Insured Clause, providing that coverage applies separately to
each insured, except with respect to the limits of liability.
f. Independent CONTRACTOR's Liability.
To the extent first dollar coverage, including defense of any claim, is not
available to OCSD or any other additional insured because of any SIR,
deductible, or any other form of self-insurance, CONTRACTOR is obligated to
assume responsibility of insurer until the deductible, SIR or other condition of
insurer assuming its defense and/or indemnity has been satisfied.
CONTRACTOR shall be responsible to pay any deductible or SIR.
g. If a crane will be used, the General Liability insurance will be endorsed to add
Riggers Liability coverage or its equivalent to cover the usage of the crane and
exposures with regard to the crane operators, riggers and others involved in
using the crane.
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 15 of 26
h. If divers will be used, the General Liability insurance will be endorsed to cover
marine liability or its equivalent to cover the usage of divers.
2. Automobile Liabilitv: The CONTRACTOR shall maintain a policy of Automobile
Liability Insurance on a comprehensive form covering all owned, non-owned, and
hired automobiles, trucks, and other vehicles providing the following minimum limits
of liability coverage:
Either (1) a combined single limit of Five Million Dollars ($5,000,000) and a general
aggregate limit of Five Million Dollars ($5,000,000) for bodily injury, personal injury
and property damage;
Or alternatively, (2) Five Million Dollars ($5,000,000) per person for bodily injury and
Two Million Dollars ($2,000,000) per accident for property damage.
3. Umbrella Excess Liability: The minimum limits of general liability and automobile
liability insurance required, as set forth above, shall be provided for either in a single
policy of primary insurance or a combination of policies of primary and umbrella
excess coverage. Excess liability coverage shall be issued with limits of liability
which, when combined with the primary insurance, will equal the minimum limits for
general liability and automobile liability.
4. Drone Liability Insurance: If a drone will be used, drone liability insurance must be
maintained by CONTRACTOR in the amount of One Million Dollars ($1,000,000) in a
form acceptable by OCSD.
5. Worker's Compensation/Employer's Liability: CONTRACTOR shall provide such
Worker's Compensation Insurance as required by the Labor Code of the State of
California, including employer's liability with a minimum limit of One Million Dollars
($1,000,000) per accident for bodily injury or disease. If an exposure to Jones Act
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 16 of 26
liability may exist, the insurance required herein shall include coverage with regard to
Jones Act claims.
Where permitted by law, CONTRACTOR hereby waives all rights of recovery by
subrogation because of deductible clauses, inadequacy of limits of any insurance
policy, limitations or exclusions of coverage, or any other reason against OCSD, its
or their officers, agents, or employees, and any other contractor or subcontractor
performing Work or rendering services on behalf of OCSD in connection with the
planning, development and construction of the Project. In all its insurance coverages
related to the Work, CONTRACTOR shall include clauses providing that each insurer
shall waive all of its rights of recovery by subrogation against OCSD, its or their
officers, agents, or employees, or any other contractor or subcontractor performing
Work or rendering services at the Project. Where permitted by law, CONTRACTOR
shall require similar written express waivers and insurance clauses from each of its
Subcontractors of every tier. A waiver of subrogation shall be effective as to any
individual or entity, even if such individual or entity (a) would otherwise have a duty
of indemnification, contractual or otherwise, (b) did not pay the insurance premium,
directly or indirectly, and (c) whether or not such individual or entity has an insurable
interest in the property damaged.
6. Pollution Liability Insurance: CONTRACTOR shall purchase and maintain insurance
for pollution liability covering bodily injury, property damage (including loss of use of
damaged property or property that has not been physically injured or destroyed),
cleanup costs, and defense costs (including costs and expenses for investigation,
defense, or settlement of claims). Coverage shall carry limits of at least Five Million
Dollars ($5,000,000) and shall apply to sudden and non-sudden pollution conditions
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 17 of 26
(including sewage spills), both at the site or needed due to migration of pollutants
from the site, resulting from the escape or release of smoke, vapors, fumes, acids,
alkalis, toxic chemicals, liquids or gases, waste materials, or other irritants,
contaminants or pollutants.
If CONTRACTOR provides coverage written on a claims-made basis, OCSD has the
right to approve or reject such coverage in its own discretion. If written on a claims-
made basis, the CONTRACTOR warrants that any retroactive date applicable to
coverage under the policy precedes the effective date of this Contract, and that
continuous coverage will be maintained, or an extended discovery period will be
exercised, for a period of two years beginning from the time that the Project under
this Contract is completed.
7. Limits are Minimums: If CONTRACTOR maintains higher limits than the minimums
shown in this Section, OCSD requires and shall be entitled to coverage for the higher
limits maintained by the CONTRACTOR.
B. Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by OCSD. At
the option of OCSD, either: the Insurer shall reduce or eliminate such deductibles or self-
insured retentions as respects OCSD, its Directors, officers, agents, CONSULTANTS, and
employees; or CONTRACTOR shall provide a financial guarantee satisfactory to OCSD
guaranteeing payment of losses and related investigations, claim administration, and
defense expenses.
C. Other Insurance Provisions
1. Each such policy of General Liability Insurance and Automobile Liability Insurance
shall be endorsed to contain, the following provisions:
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 18 of 26
a. OCSD, its Directors, officers, agents, CONSULTANTS, and employees, and all
public agencies from whom permits will be obtained, and their Directors,
officers, agents, and employees are hereby declared to be additional insureds
under the terms of this policy, but only with respect to the operations of
CONTRACTOR at or from any of the sites of OCSD in connection with this
Contract, or acts and omissions of the additional insured in connection with its
general supervision or inspection of said operations related to this Contract.
b. Insurance afforded by the additional insured endorsement shall apply as
primary insurance, and other insurance maintained by OCSD shall be excess
only and not contributing with insurance provided under this policy.
2. Each insurance policy required herein shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30) days prior written notice by
certified mail, return receipt requested, and that coverage shall not be cancelled for
non-payment of premium except after ten (10) days prior written notice by certified
mail, return receipt requested. Should there be changes in coverage or an increase
in deductible or SIR amounts, CONTRACTOR undertakes to procure a manuscript
endorsement from its insurer giving 30 days prior notice of such an event to OCSD,
or to have its insurance broker/agent send to OCSD a certified letter describing the
changes in coverage and any increase in deductible or SIR amounts. The certified
letter must be sent Attention: Risk Management and shall be received not less than
twenty (20) days prior to the effective date of the change(s). The letter must be
signed by a Director or Officer of the broker/agent and must be on company
letterhead, and may be sent via e-mail in pdf format.
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 19 of 26
3. Coverage shall not extend to any indemnity coverage for the active negligence of
any additional insured in any case where an agreement to indemnify the additional
insured would be invalid under California Civil Code Section 2782(b).
4. If required by a public agency from whom permit(s) will be obtained, each policy of
General Liability Insurance and Automobile Liability Insurance shall be endorsed to
specify by name the public agency and its legislative members, officers, agents,
CONSULTANTS, and employees, to be additional insureds.
D. Acceptability of Insurers
Insurers must have an "A2, or better, Policyholder's Rating, and a Financial Rating of at
least Class VIII, or better, in accordance with the most current A.M. Best Rating Guide.
OCSD recognizes that State Compensation Insurance Fund has withdrawn from
participation in the A.M. Best Rating Guide process. Nevertheless, OCSD will accept
State Compensation Insurance Fund for the required policy of worker's compensation
insurance, subject to OCSD's option, at any time during the term of this Contract, to
require a change in insurer upon twenty (20) days written notice. Further, OCSD will
require CONTRACTOR to substitute any insurer whose rating drops below the levels
herein specified. Said substitution shall occur within twenty (20) days of written notice to
CONTRACTOR by OCSD or its agent.
E. Verification of Coverage
CONTRACTOR shall furnish OCSD with original certificates and mandatory endorsements
affecting coverage. Said policies and endorsements shall conform to the requirements
herein stated. All certificates and endorsements are to be received and approved by
OCSD before Work commences. OCSD reserves the right to require complete, certified
copies of all required insurance policies, including endorsements, affecting the coverage
required by these Specifications at any time.
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 20 of 26
F. Subcontractors
CONTRACTOR shall be responsible to establish insurance requirements for any
Subcontractors hired by CONTRACTOR. The insurance shall be in amounts and types
reasonably sufficient to deal with the risk of loss involving the Subcontractor's operations
and work. OCSD and any public agency issuing permits for the Project must be named as
"Additional Insured" on any General Liability or Automobile Liability policy obtained by a
Subcontractor. The CONTRACTOR must obtain copies and maintain current versions of
all Subcontractors' policies, Certificate of Liability and mandatory endorsements effecting
coverage. Upon request, CONTRACTOR must furnish OCSD with the above referenced
required documents.
G. Required Forms and Endorsements
1. Required ACORD Form
a. Certificate of Liability Form 25
2. Required Insurance Services Office, Inc. Endorsements (when alternative forms are
shown, they are listed in order of preference)
In the event any of the following forms are cancelled by Insurance Services Office,
Inc. (ISO), or are updated, the ISO replacement form or equivalent must be supplied.
a. Commercial General Liability Form CG-0001 10 01
b. Additional Insured Including Form CG-2010 10 01 and
Products-Completed Operations Form CG-2037 10 01
C. Waiver of Transfer of Rights of Form CG-2404 11 85; or
Recovery Against Others to Us/ Form CG-2404 10 93
Waiver of Subrogation
3. Required State Compensation Insurance Fund Endorsements
a. Waiver of Subrogation Endorsement No. 2570
b. Cancellation Notice Endorsement No. 2065
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 21 of 26
4. Additional Required Endorsements
a. Notice of Policy Termination Manuscript Endorsement
5. Pollution Liability Endorsements
There shall be a Separation of Insured Clause or endorsement, providing that
coverage applies separately to each insured, except with respect to the limits of
liability. There shall also be an endorsement or policy language containing a waiver
of subrogation rights on the part of the insurer.
OCSD, its directors, officers, agents, CONSULTANTS and employees and all public
agencies from whom permits will be obtained as well as their directors, officers,
agents, and employees shall be included as insureds under the policy. Any
additional insured endorsement shall contain language at least as broad as the
coverage language contained in ISO form CG 20 10 11 85 or alternatively in both
CG 20 10 10 01 and CG 20 37 10 01 together.
SECTION — 17 RISK AND INDEMNIFICATION
All Work covered by this Contract done at the site of construction or in preparing or delivering
materials to the site shall be at the risk of CONTRACTOR alone. CONTRACTOR shall save,
indemnify, defend, and keep OCSD and others harmless as more specifically set forth in
General Conditions, "General Indemnification".
SECTION — 18 TERMINATION
This Contract may be terminated in whole or in part in writing by OCSD in the event of
substantial failure by the CONTRACTOR to fulfill its obligations under this Agreement, or it may
be terminated by OCSD for its convenience provided that such termination is effectuated in a
manner and upon such conditions set forth more particularly in General Conditions,
"Termination for Default" and/or "Termination for Convenience", provided that no termination
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 22 of 26
may be effected unless proper notice is provided to CONTRACTOR at the time and in the
manner provided in said General Conditions. If termination for default or convenience is
effected by OCSD, an equitable adjustment in the price provided for in this Contract shall be
made at the time and in the manner provided in the General Conditions, "Termination for
Default" and "Termination for Convenience".
SECTION — 19 WARRANTY
The CONTRACTOR agrees to perform all Work under this Contract in accordance with the
Contract Documents, including OCSD's designs, Drawings and Specifications.
The CONTRACTOR guarantees for a period of at least one (1) year from the date of Final
Acceptance of the Work, pursuant to the General Conditions, "Final Acceptance and Final
Completion" that the completed Work is free from all defects due to faulty materials, equipment
or workmanship and that it shall promptly make whatever adjustments or corrections which may
be necessary to cure any defects, including repairs of any damage to other parts of the system
resulting from such defects. OCSD shall promptly give notice to the CONTRACTOR of
observed defects. In the event that the CONTRACTOR fails to make adjustments, repairs,
corrections or other work made necessary by such defects, OCSD may do so and charge the
CONTRACTOR the cost incurred. The CONTRACTOR's warranty shall continue as to any
corrected deficiency until the later of(1) the remainder of the original one-year warranty period;
or (2) one year after acceptance by OCSD of the corrected Work. The Performance Bond and
the Payment Bond shall remain in full force and effect through the guarantee period.
The CONTRACTOR's obligations under this clause are in addition to the CONTRACTOR's
other express or implied assurances under this Contract, including but not limited to specific
manufacturer or other extended warranties specified in the Plans and Specifications, or state
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 23 of 26
law and in no way diminish any other rights that OCSD may have against the CONTRACTOR
for faulty materials, equipment or Work.
SECTION — 20 ASSIGNMENT
No assignment by the CONTRACTOR of this Contract or any part hereof, or of funds to be
received hereunder, will be recognized by OCSD unless such assignment has had prior written
approval and consent of OCSD and the Surety.
SECTION — 21 RESOLUTION OF DISPUTES
OCSD and the CONTRACTOR shall comply with the provisions of California Public Contract
Code Section 20104 et. seq., regarding resolution of construction claims for any Claims which
arise between the CONTRACTOR and OCSD, as well as all applicable dispute and Claims
provisions as set forth in the General Conditions and as otherwise required by law.
SECTION — 22 SAFETY & HEALTH
CONTRACTOR shall comply with all applicable safety and health requirements mandated by
federal, state, city and/or public agency codes, permits, ordinances, regulations, and laws, as
well as these Contract Documents, including but not limited to the General Requirements,
Section entitled "Safety" and Exhibit B OCSD Safety Standards.
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 24 of 26
SECTION — 23 NOTICES
Any notice required or permitted under this Contract shall be sent by certified mail, return receipt
requested, at the address set forth below. Any party whose address changes shall notify the
other party in writing.
TO OCSD: Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Attn: Clerk of the Board
Copy to: Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, California 92708-7018
Attn: Construction Manager
Bradley R. Hogin, Esquire
Woodruff, Spradlin & Smart
555 Anton Boulevard
Suite 1200
Costa Mesa, California 92626
TO CONTRACTOR: Shimmick Construction Co., Inc.
530 Technology Drive, Suite 300
Irvine, CA 92618
Copy to: Matthew Kuzmick, Executive Vice-President—
Southwest Area
Shimmick Construction Co., Inc.
530 Technology Drive, Suite 300
Irvine, CA 92618
CONFORMED C-CA-022619
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 25 of 26
IN WITNESS WHEREOF, the parties hereto have executed this Contract Agreement as the
date first hereinabove written.
CONTRACTOR: Shimmick Construction Co., Inc.
530 Technology Drive, Suite 300
Irvine, CA 92618
By
Printed Name
Its
CONTRACTOR's State License No. 594575 (Expiration Date — 5/31/2020)
OCSD: Orange County Sanitation District
By
David John Shawver
Board Chairman
By
Kelly A. Lore
Clerk of the Board
By
Ruth Zintzun
Purchasing & Contracts Manager
C-CA-022619 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 26 of 26
EXHIBIT A
SCHEDULE OF PRICES
C-EXA-080414
TABLE OF CONTENTS
EXHIBIT A
SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION............................................................................. 1
EXA-2 PROGRESS PAYMENTS ..................................................................................1
EXA-3 RETENTION AND ESCROW ACCOUNTS........................................................1
EXA-4 STOP PAYMENT NOTICE.................................................................................3
EXA-5 PAYMENT TO SUBCONTRACTORS................................................................3
EXA-6 PAYMENT OF TAXES .......................................................................................3
EXA-7 FINAL PAYMENT...............................................................................................4
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT ...5
ATTACHMENT 1 - CERTIFICATION FOR REQUEST FOR PAYMENT.........................7
ATTACHMENT 2 - SCHEDULE OF PRICES...................................................................8
C-EXA-080414
EXHIBIT
SCHEDULE OF PRICES
EXA-1 BASIS OF COMPENSATION
CONTRACTOR will be paid the Contract Price according to the Schedule of
Prices, and all other applicable terms and conditions of the Contract
Documents.
EXA-2 PROGRESS PAYMENTS
Progress payments will be made in accordance with all applicable terms and
conditions of the Contract Documents, including, but not limited to:
1. Contract Agreement— Section 11 — "Contract Price and Method of
Payment;"
2. General Conditions — "Payment— General";
3. General Conditions—"Payment—Applications for Payment";
4. General Conditions — "Payment— Mobilization Payment Requirements;"
5. General Conditions — "Payment— Itemized Breakdown of Contract Lump
Sum Prices";
6. General Conditions — "Contract Price Adjustments and Payments";
7. General Conditions— "Suspension of Payments";
8. General Conditions — "OCSD's Right to Withhold Certain Amounts and
Make Application Thereof"; and
9. General Conditions — "Final Payment."
EXA-3 RETENTION AND ESCROW ACCOUNTS
A. Retention:
OCSD shall retain a percentage of each progress payment to assure
satisfactory completion of the Work. The amount to be retained from each
progress payment shall be determined as provided in General Conditions—
"Retained Funds; Substitution of Securities". In all contracts between
CONTRACTOR and its Subcontractors and/or Suppliers, the retention may not
exceed the percentage specified in the Contract Documents.
CONFORMED C-EXA-080414
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 1 of 8
B. Substitution of Securities:
CONTRACTOR may, at its sole expense, substitute securities as provided in
General Conditions—"Retained Funds; Substitution of Securities." Payment of
Escrow Agent:
In lieu of substitution of securities as provided above, the CONTRACTOR may
request and OCSD shall make payment of retention earned directly to the
escrow agent at the expense of the CONTRACTOR. At the expense of the
CONTRACTOR, the CONTRACTOR may direct the investment of the
payments into securities consistent with Government Code §16430 and the
CONTRACTOR shall receive the interest earned on the investments upon the
same terms provided for in this article for securities deposited by the
CONTRACTOR. Upon satisfactory completion of the Contract, the
CONTRACTOR shall receive from the escrow agent all securities, interest and
payments received by the escrow agent from OCSD, pursuant to the terms of
this article. The CONTRACTOR shall pay to each Subcontractor, not later than
twenty (20) calendar days after receipt of the payment, the respective amount
of interest earned, net of costs attributed to retention withheld from each
Subcontractor, on the amount of retention withheld to ensure the performance
of the Subcontractor. The escrow agreement used by the escrow agent
pursuant to this article shall be substantially similar to the form set forth in
§22300 of the California Public Contract Code.
C. Release of Retention:
Upon Final Acceptance of the Work, the CONTRACTOR shall submit an
invoice for release of retention in accordance with the terms of the Contract.
D. Additional Deductibles:
In addition to the retentions described above, OCSD may deduct from each
progress payment any or all of the following:
1. Liquidated Damages that have occurred as of the date of the application for
progress payment;
2. Deductions from previous progress payments already paid, due to OCSD's
discovery of deficiencies in the Work or non-compliance with the
Specifications or any other requirement of the Contract;
3. Sums expended by OCSD in performing any of the CONTRACTOR'S
obligations under the Contract that the CONTRACTOR has failed to
perform, and;
4. Other sums that OCSD is entitled to recover from the CONTRACTOR
under the terms of the Contract, including without limitation insurance
deductibles and assessments.
C-EXA-080414 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 2 of 8
The failure of OCSD to deduct any of the above-identified sums from a
progress payment shall not constitute a waiver of OCSD's right to such sums or
to deduct them from a later progress payment.
EXA-4 STOP PAYMENT NOTICE
In addition to other amounts properly withheld under this article or under other
provisions of the Contract, OCSD shall retain from progress payments
otherwise due the CONTRACTOR an amount equal to one hundred twenty-five
percent (125%) of the amount claimed under any stop payment notice under
Civil Code §9350 et. seq. or other lien filed against the CONTRACTOR for
labor, materials, supplies, equipment, and any other thing of value claimed to
have been furnished to and/or incorporated into the Work; or for any other
alleged contribution thereto. In addition to the foregoing and in accordance with
Civil Code §9358 OCSD may also satisfy its duty to withhold funds for stop
payment notices by refusing to release funds held in escrow pursuant to public
receipt of a release of stop payment notice executed by a stop payment notice
claimant, a stop payment notice release bond, an order of a court of competent
jurisdiction, or other evidence satisfactory to OCSD that the CONTRACTOR
has resolved such claim by settlement.
EXA-5 PAYMENT TO SUBCONTRACTORS
Requirements
1. The CONTRACTOR shall pay all Subcontractors for and on account of
Work performed by such Subcontractors, not later than seven (7) days after
receipt of each progress payment as required by the California Business
and Professions Code §7108.5. Such payments to Subcontractors shall be
based on the measurements and estimates made pursuant to article
progress payments provided herein.
2. Except as specifically provided by law, the CONTRACTOR shall pay all
Subcontractors any and all retention due and owing for and on account of
Work performed by such Subcontractors not later than seven (7) days after
CONTRACTOR'S receipt of said retention proceeds from OCSD as
required by the California Public Contract Code §7107.
EXA-6 PAYMENT OF TAXES
Unless otherwise specifically provided in this Contract, the Contract Price
includes full compensation to the CONTRACTOR for all taxes. The
CONTRACTOR shall pay all federal, state, and local taxes, and duties
applicable to and assessable against any Work, including but not limited to
retail sales and use, transportation, export, import, business, and special taxes.
The CONTRACTOR shall ascertain and pay the taxes when due. The
CONTRACTOR will maintain auditable records, subject to OCSD reviews,
confirming that tax payments are current at all times.
CONFORMED C-EXA-080414
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 3 of 8
EXA-7 FINAL PAYMENT
After Final Acceptance of the Work, as more particularly set forth in the
General Conditions, "Final Acceptance and Final Completion", and after
Resolution of the Board authorizing final payment and satisfaction of the
requirements as more particularly set forth in General Conditions — "Final
Payment", a final payment will be made as follows:
1. Prior to Final Acceptance, the CONTRACTOR shall prepare and submit an
application for Final Payment to OCSD, including:
a. The proposed total amount due the CONTRACTOR, segregated by
items on the payment schedule, amendments, Change Orders, and
other bases for payment;
b. Deductions for prior progress payments;
c. Amounts retained;
d. A conditional waiver and release on final payment for each
Subcontractor (per Civil Code Section 8136);
e. A conditional waiver and release on final payment on behalf of the
CONTRACTOR (per Civil Code Section 8136);
f. List of Claims the CONTRACTOR intends to file at that time or a
statement that no Claims will be filed,
g. List of pending unsettled claims, stating claimed amounts, and copies of
any and all complaints and/or demands for arbitration received by the
CONTRACTOR; and
h. For each and every claim that resulted in litigation or arbitration which
the CONTRACTOR has settled, a conformed copy of the Request for
Dismissal with prejudice or other satisfactory evidence the arbitration is
resolved.
2. The application for Final Payment shall include complete and legally
effective releases or waivers of liens and stop payment notices satisfactory
to OCSD, arising out of or filed in connection with the Work. Prior progress
payments shall be subject to correction in OCSD's review of the application
for Final Payment. Claims filed with the application for Final Payment must
be otherwise timely under the Contract and applicable law.
3. Within a reasonable time, OCSD will review the CONTRACTOR'S
application for Final Payment. Any recommended changes or corrections
will then be forwarded to the CONTRACTOR. Within ten (10) calendar
days after receipt of recommended changes from OCSD, the
CONTRACTOR will make the changes, or list Claims that will be filed as a
result of the changes, and shall submit the revised application for Final
C-EXA-080414 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 4 of 8
Payment. Upon acceptance by OCSD, the revised application for Final
Payment will become the approved application for Final Payment.
4. If no Claims have been filed with the initial or any revised application for
Final Payment, and no Claims remain unsettled within thirty-five (35)
calendar days after Final Acceptance of the Work by OCSD, and
agreements are reached on all issues regarding the application for Final
Payment, OCSD, in exchange for an executed release, satisfactory in form
and substance to OCSD, will pay the entire sum found due on the approved
application for Final Payment, including the amount, if any, allowed on
settled Claims.
5. The release from the CONTRACTOR shall be from any and all Claims
arising under the Contract, except for Claims that with the concurrence of
OCSD are specifically reserved, and shall release and waive all unreserved
Claims against OCSD and its officers, directors, employees and authorized
representatives. The release shall be accompanied by a certification by the
CONTRACTOR that:
a. It has resolved all Subcontractors, Suppliers and other Claims that are
related to the settled Claims included in the Final Payment;
b. It has no reason to believe that any party has a valid claim against the
CONTRACTOR or OCSD which has not been communicated in writing
by the CONTRACTOR to OCSD as of the date of the certificate;
c. All warranties are in full force and effect, and;
d. The releases and the warranties shall survive Final Payment.
6. If any claims remain open, OCSD may make Final Payment subject to
resolution of those claims. OCSD may withhold from the Final Payment an
amount not to exceed one hundred fifty percent (150%) of the sum of the
amounts of the open claims, and one hundred twenty-five percent (125%)
of the amounts of open stop payment notices referred to in article entitled
stop payment notices herein.
7. The CONTRACTOR shall provide an unconditional waiver and release on
final payment from each Subcontractor and Supplier providing Work under
the Contract (per Civil Code Section 8138) and an unconditional waiver and
release on final payment on behalf of the CONTRACTOR (per Civil Code
Section 8138)within thirty (30) days of receipt of Final Payment.
EXA-8 DISCOVERY OF DEFICIENCIES BEFORE AND AFTER FINAL PAYMENT
Notwithstanding OCSD's acceptance of the application for Final Payment and
irrespective of whether it is before or after Final Payment has been made,
OCSD shall not be precluded from subsequently showing that:
1. The true and correct amount payable for the Work is different from that
previously accepted;
CONFORMED C-EXA-080414
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 5 of 8
2. The previously-accepted Work did not in fact conform to the Contract
requirements, or;
3. A previous payment or portion thereof for Work was improperly made.
OCSD also shall not be stopped from demanding and recovering damages
from the CONTRACTOR, as appropriate, under any of the foregoing
circumstances as permitted under the Contract or applicable law.
C-EXA-080414 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 6 of 8
ATTACHMENT 1 — CERTIFICATION FOR REQUEST FOR PAYMENT
I hereby certify under penalty of perjury as follows:
That the claim for payment is in all respects true, correct; that the services mentioned
herein were actually rendered and/or supplies delivered to OCSD in accordance with the
Contract.
I understand that it is a violation of both the federal and California False Claims Acts to
knowingly present or cause to be presented to OCSD a false claim for payment or
approval.
A claim includes a demand or request for money. It is also a violation of the False
Claims Acts to knowingly make use of a false record or statement to get a false claim
paid. The term "knowingly" includes either actual knowledge of the information,
deliberate ignorance of the truth or falsity of the information, or reckless disregard for the
truth or falsity of the information. Proof of specific intent to defraud is not necessary
under the False Claims Acts. I understand that the penalties under the Federal False
Claims Act and State of California False Claims Act are non-exclusive, and are in
addition to any other remedies which OCSD may have either under contract or law.
I hereby further certify, to the best of my knowledge and belief, that:
1. The amounts requested are only for performance in accordance with the
Specifications, terms, and conditions of the Contract;
2. Payments to Subcontractors and Suppliers have been made from previous payments
received under the Contract, and timely payments will be made from the proceeds of
the payment covered by this certification;
3. This request for progress payments does not include any amounts which the prime
CONTRACTOR intends to withhold or retain from a Subcontractor or Supplier in
accordance with the terms and conditions of the subcontract; and
4. This certification is not to be construed as Final Acceptance of a Subcontractor's
performance.
Name
Title
Date
CONFORMED C-EXA-080414
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 7 of 8
ATTACHMENT 2 —SCHEDULE OF PRICES
See next pages from the Bid submittal Forms (Shimmick Construction Co., Inc.):
BF-14 Schedule of Prices, Pages 1-3
C-EXA-080414 CONFORMED
PROJECT NO. P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
Page 8 of 8
Bid Submitted By: Shimmick Construction Co, Inc.
(Name of Firm)
BF-14 SCHEDULE OF PRICES
INSTRUCTIONS
A. General
For Unit Prices, it is understood that the following quantities are approximate only and are
solely for the purpose of estimating the comparison of Bids, and that the actual value of Work
will be computed based upon the actual quantities in the completed Work,whether they be
more or less than those shown. CONTRACTOR's compensation for the Work under the
Contract Documents will be computed based upon the lump sum amount of the Contract at
time of award, plus any additional or deleted costs approved by OCSD via approved Change
Orders, pursuant to the Contract Documents.
Bidder shall separately price and accurately reflect costs associated with each line item,
leaving no blanks. Any and all modifications to the Bid must be initialed by an authorized
representative of the Bidder in accordance with the Instructions to Bidders, Preparation of Bid.
Bidders are reminded of Instruction to Bidders, Discrepancy in Bid Items,which, in summary,
provides that the total price for each item shall be based on the Unit Price listed for each item
multiplied by the quantity; and the correct Total Price for each item shall be totaled to
determine the Total Amount of Bid.
All applicable costs including overhead and profit shall be reflected in the respective unit costs
and the TOTAL AMOUNT OF BID. The Bid price shall include all costs to complete the Work,
includina profit overhead etc., unless otherwise specified in the Contract Documents. All
applicable sales taxes state and/or federal.and any other special taxes.patent riahts or
royalties shall be included in the prices auoted in this Bid.
B. Basis of Award
AWARD OF THE CONTRACT WILL BE MADE ON THE BASIS OF THE LOWEST
RESPONSIVE AND RESPONSIBLE BID.
Note 1: Base Bid. Includes all costs necessary to furnish all labor, materials,equipment and
services for the construction of the Project per the Contract Documents.
BF-14 SCHEDULE OF PRICES C-BF-121817
PROJECT NO.P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO.2
Page 1 of 3
Bid Submitted By: Shimmick Construction Company, Inc.
(Name of Firm)
EXHIBIT A
SCHEDULE OF PRICES
BASE BID ITEMS (Refer to Note 1 in the Instructions):
Item
No. Description Unit of Approx
Measurement Qty Unit Price Extended Price
1. ! Mobilization: The amount for this Bid Item shall not exceed 4% of the Total !
Amount of Bid and shall be in conformance with the Contract Documents
for the lump sum price of...
All amounts included in this Bid Item greater than the allowable maximum Lump Sum 1 $ Z y15 O ba cd
i payment of 4% of the Total Amount of Bid shall be paid under the Bid Item
i
"Demobilization".
j2. Hazardous Material Mitigation and Controls: This item includes all labor,
material, and equipment necessary to mitigate, remove, and properly
j dispose of all Hazardous Waste including Lead and Asbestos. Work shall Lump Sum 1 $ It+J�S t38, ors
be performed in accordance with the plans and specifications.
F '
3. Crack Repair: This item includes all labor, material, and equipment for
surface preparation and expanding polyurethane injection for Aeration
Basin cracks. Unit price bid shall include labor, equipment, and materials
needed for confined space entry into aeration basin during application of Linear Feet 1290 X $ ILb• y =j $ I(0 3
crack injection. Work shall be performed in accordance with the plans and
specifications for the linear foot unit price of...
4 Spall Repair: This item includes all labor, material, and equipment for saw
1 cutting, substrate concrete removal, substrate and rebar preparation and
mortar repair of spalled/delamination aeration basin surfaces. Work shall be SFeete 4945 X $ $U. qS�- $ 1/7-1
performed in accordance with the plans and specifications for the square
! foot unit price of...
i
BF-14 SCHEDULE OF PRICES C-BF-121817
PROJECT NO, P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
ADDENDUM NO. 1
Page 2 of 3
Bid Submitted By: Shimmick Construction Company, Inc.
(Name of Firm)
EXHIBIT A
SCHEDULE OF PRICES
(continued)
INo. Description Mea nit of App p r x Unit Price Extended Price
5. Completion of Work: This item includes labor, materials, and equipment
necessary for all portions of Work set forth in the Contract Documents
except for the Work performed in Items 1, 2, 3, 4, and 6, as described in Lump Sum 1 =i $ S o 33,c(.o.o�
Division 01, Section 01155 and in conformance with the Contract
Documents for a lump sum price of...
6. j Demobilization: The amount for this Bid Item shall not be less than 1% of �
the Total Amount of Bid and shall include but not be limited to the
acceptance of Work by OCSD, completion of all items on final punch list,
final cleanup and processing of final progress payment request, in Lump Sum 1 $ I r 0� CPU
conformance with the Contract Documents for a lump sum price of ...
All amounts greater than 4%which were included in Bid Item 1 Mobilization
shall be paid under this Demobilization Bid Item.
TOTAL AMOUNT OF BID(BASIS OF AWARD) $ 40, OqZ� //o. 35-
BF-14 SCHEDULE OF PRICES C-BF-121817
PROJECT NO P2-123
RETURN ACTIVATED SLUDGE PIPING REPLACEMENT AT PLANT NO. 2
ADDENDUM NO 1
Page 3 of 3
9/4/2019
MEN Returned Activated
NON® Sludge Piping
OMENReplacement at
Plant No. 2
MCA .M
Project No. P2-123
�` A
Operations Committee Presentation
September 4, 2019
MEMO&&
Activated Sludge 131
Plant at Plant
• 1•
• Biological
treatment using
oxygen f ,
Is
• Built in 1979
• Includes � ► ■
three main :�` �
components
• Aeration basins
• Clarifiers ``
• Return activated
sludge system
2
1
9/4/2019
Sludge
s
• • • acement
• —2,000 feet of
10 to 36-inch pipe
• 40 years old
• Frequent leaks
Element 2 - Aeration
Basin Concrete Repair Z% < x,
• Maintain Structural
Integrity of Basin Deck
• Spall repair
• Crack repair
• Replace corroded
reinforcement
JjJ
4
2
9/4/2019
LightPole Replacement
�•L�'
• Replace 80 corroded light
poles and fixtures across
,r
entire site
• Collapsible poles for
better maintenance
access
-k" < • Safety for Staff
5
• Results6'*A ,.
AmountCompany
1. Shimmick Construction Company $6,042,110
2. W.M. Lyles Co. $6,593,870
3. Kiewit Infrastructure West Co. $6,843,000
4. Stanek Constructors, Inc. $8,414,700
5. Innovative Construction Solutions $8,732,865
6. Steve P. Rados, Inc. $8,837,625
7. Myers&Sons Construction LLC $10,620,000
8. OHL USA, Inc. $10,839,350
Engineer's Estimate $14,000,000
6
3
9/4/2019
L
Protest
rt rti
�.
• 2nd Low Bidder, W.M. Lyles Co., alleged issues
with Shimmick's safety record
• In consultation with General Counsel, staff
reviewed and determined the protest does not
merit a change to the award recommendation
• Many incidents are still pending determination
• Several were against joint venture partners
• No clear and consistent pattern of violations
Recommendations
• Deny award protest filed by W.M. Lyles Co.;
• Award a Construction Contract to Shimmick
Construction Company for Return Activated
Sludge Piping Replacement at Plant No. 2,
Project No. P2-123, for a total amount not to
exceed $6,042,111 .35; and
• Approve a Construction Contract contingency of
$604,211 (10%).
s
4
9/4/2019
Recommendations
• Approve a Professional Construction Services
(PCSA) Agreement with Spec Services Inc. to
provide construction support services for Return
Activated Sludge Piping Replacement at Plant
No. 2, Project No. P2-123, for a total amount not
to exceed $252,329; and
• Approve a contingency of $25,233 (10%)
9
Questi
• 04, -
10
5
oJ�V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
OPERATIONS COMMITTEE (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-603 Agenda Date: 9/25/2019 Agenda Item No: 7.
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
CAPITAL IMPROVEMENT PROGRAM CONTRACT PERFORMANCE REPORT
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file the Capital Improvement Program Contract Performance Report for the period
ending June 30, 2019.
BACKGROUND
The Capital Improvement Program involves awarding and managing many construction and
consulting contracts. In 2008, the Orange County Sanitation District (Sanitation District) Board of
Directors began awarding contingencies along with construction and consulting contracts and
amendments for consulting contracts up to the amount of the approved contingency. This practice
reduces administrative costs, expedites resolution of project issues that arise, helps avoid Contractor
delay claims, and facilitates efficient management of many contracts.
The Capital Improvement Program Contract Performance Report summarizes construction and
consulting contract performance and activities for the quarter ending June 30, 2019. This report is
updated quarterly. The tables listing active construction and design consultant contract data have
been revised for clarity since the previous quarter.
RELEVANT STANDARDS
• Ensure the public's money is wisely spent
ATTACHMENT
The following attachment is included in hard copy and may also be viewed on-line at the OCSD website (www.ocsd.com)
with the complete agenda package:
• Capital Improvement Program Contract Performance Report for the period ending June 30,
2019
Orange County Sanitation District Page 1 of 1 Printed on 9/19/2019
powered by LegistarTM
SANITORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
90 ME For the period ending June 30, 2019
� a`
DATE: August 16, 2019
TO: Orange County Sanitation District
Board of Directors
FROM: James D. Herberg, General Manager
Through: Kathy Millea, Director of Engineering
This report summarizes the status, activities, and performance of public works
construction contracts and consultant agreements. This report also identifies the names
and status of projects being performed under master budgets for planning studies,
research, small construction projects, O&M capital projects, and information technology
projects.
Table of Contents
Part 1 - Construction Contracts ..........................................................................................2
Part 2 — Design Consultant Agreements ............................................................................7
Part 3 — Master Budget Projects....................................................................................... 11
Part 4 — Staff Augmentation Contract............................................................................... 17
Page 1 of 17
SANITORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
90 For the period ending June 30, 2019
THE EMV
PART 1 - CONSTRUCTION CONTRACTS
When the Sanitation District Board awards a construction contract, a contingency is also
approved which allows the General Manager to approve contract change orders up to the
amount of the contingency. One of the purposes of this report is to document how that
contingency is managed and how much of the contingency is utilized. A project's change
order rate can only be documented when the work is complete. As such, the change
order performance charts in this report are based only on projects closed since the Board
began approving contingencies in 2008.
As of the end of this quarter, 76 contracts have been closed with total base contact value
of $1,254,226,489, and there are 22 active contracts with a total base contract value of
$389,241,739. For reference see charts 1 and 2, and Tables 1 and 2.
Chart 1
Construction Contracts — Closed Projects
Cumulative Data through Quarter Ending June 30, 2019 QTR FY18/19
I ■ Collections
Plant Projects
CLOSED PROJECTS- DISTRIBUTION BY CATEGORY*
Total Base Contract Value $ 1,254,226,489
Collections $ 312,548,525 25%
Plant Projects $ 941,677,964 75%
Total Base#of Contracts 76
Collections 31
Plant Projects 45
*Projects closed since 2 QTR FY07/08
Page 2 of 17
SANITORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
90 ME For the period ending June 30, 2019
� a`
Chart 2
Construction Contracts — Active Projects
Cumulative Data through Quarter Ending June 30, 2019 QTR FY18/19
%44'CAWN
■ Collections
T*, ,4 ■ Plant Projects
ACTIVE PROJECTS -DISTRIBUTION BY CATEGORY
Total Base Contract Value $ 389,241,739
Collections $ 64,750,383 17%
Plant Projects $ 324,491,356 83%
Total Base#of Contracts 22
Collections 4
Plant Projects 18
Page 3 of 17
ORANGE COUNTY SANITATION DISTRICT
`• Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
The change order rate over time for all closed projects for the last quarter (April 1, 2019
through June 30, 2019) is 5.3%. For closed collection projects is 9.08% and for closed
plant projects is 4.02%. For reference see charts 3, 4 and 5.
Chart 3
Change Order Rates Over Time
All Closed Projects
8.00%
6.1%
6.00% 5.3%
5.0%
4.00% 5.0% 3.9 0
2.00% 3.4%
0.00%
'y 'L 'L "� "� D D 5 h <o �o 1 10� 4> 4OA 00'L OOA
a° o-° a° a° o-ti ati oti o-ti o-ti ati o-ti o-ti o-ti o-ti o-ti o-ti ati o-ti o-ti C o-ti o-ti ati o-ti
Chart 4
Change Order Rates Over Time
Closed Collections Projects
14.00%
12.00% 12.35%
10.00% 9.53% 9.08%
8.00% 7.14%
6.00%
4.00% 5.52%
2.00%
0.00%
Chart 5
Change Order Rates Over Time
Closed Plant Projects
8.00%
6.00% 5.73%
4.369% 4.02%
4.00%
3.89%
2.00% 2 70%
0.00%
Off' Off` Off' Off` Off' Off` Off' Off` Off' Off` Off' Off` Off' Off` Off' Off` Off' Off` Off' Off` Off' Off` Off' Off`
04' p O°� pc y0 ,y0 y' y', y, y,, p '1� ti� ,yR , , >1 ti0 ti0 tit tit y4' y4' ti0 ti�
o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o- o-
Page 4 of 17
ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30,2019
Table 1-Active Construction Contracts
Award Board Award Current Original Current Contingency Contingency
Project/Contract Contractor Date Value Change Orders Contract Value Contingency Contingency Used Remaining
2-41-8 SARI Rock Stabilizers Removal
2-41-8 SARI Rock Stabilizers Removal Griffith Company 09/26/2018 $2,809,082 $0 $2,809,082 10.0% 10.0% 0.0% 10.0%
2-72 Newhope-Placentia Trunk Replacement
2-72B Newhope-Placentia Trunk Replacement,Segment B OHL USA,INC. 06/15/2018 $58,242,000 $0 $58,242,000 6.5% 6.5% 0.0% 6.5%
6-17 District 6 Trunk Sewer Relief
6-17 District 6 Trunk Sewer Relief Charles King Company,Inc. 11/01/2016 $3,699,301 $409,174 $4,108,475 10.0% 20.0% 11.1% 8.9%
J-117 Ocean Outfall System Rehabilitation
J-117A Interplant Effluent Pipeline Rehabilitation Shimmick Construction Co.,Inc. 08/07/2017 $12,609,012 $635,038 $13,244,050 8.0% 8.0% 5.0% 3.0%
J-117B Outfall Low Flow Pump Station Shimmick Construction Co.,Inc. 12/19/2018 $90,200,000 $0 $90,200,000 8.0% 8.0% 0.0% 8.0%
J-126 Safety Improvements Program
J-126AH Hot Surfaces Insulation P1/P2/Bay Bridge PS/Slater PS Amtek Construction 01/30/2018 $452,757 $0 $452,757 10.0% 10.0% 0.0% 10.0%
J-126BFG Lights,Ladder and Walkway Hazards Amtek Construction 09/26/2017 $557,759 $0 $557,759 10.0% 10.0% 0.0% 10.0%
J-126C NFPA 820 HVAC and Electrical Improvements MMC,Inc. 03/05/2019 $469,000 $0 $469,000 10.0% 10.0% 0.0% 10.0%
J-1261 Exit Signs Exit Lights Electrical Disconnects Gas Helix Electric 09/26/2018 $881,800 $0 $881,800 10.0% 10.0% 0.0% 10.0%
Detection
J-126JK Stairs,Hatches,Walkway Hazards,Ladders,Guardrails, Olsson Construction,Inc. 10/24/2018 $3,637,601 $0 $3,637,601 10.0% 10.0% 0.0% 10.0%
Roof Fall Protection
J-126PQ Ladders,Hatches,Roof Fall Protection Tharsos,Inc. 10/24/2018 $786,000 $0 $786,000 10.0% 10.0% 0.0% 10.0%
M-FE Small Construction Projects Program
FE14-05 Plant No.1 Fleet Services UST Leak Remediation Engineering/Remediation 01/23/2019 $648,675 $0 $648,675 20.0% 20.0% 0.0% 20.0%
Resources Group,Inc.
FE15-07 Secondary Treatment and Plant Water VFD Helix Electric 03/28/2018 $1,797,000 $23,562 $1,820,562 10.0% 10.0% 1.3% 8.7%
Replacement at Plant 1
FE15-10 East Lido Force Main Rehabilitation Charles King Company,Inc. 09/07/20171 $1,389,000 $0 $1,389,000 10.0% 10.0% 0.0% 10.0%
FE17-05 Plant 1 ICS Network Extension RP Controls 06/26/2019 $321,889 $0 $321,889 10.0% 10.0% 0.0% 10.0%
MP-248 P2 Secondary Clarifier Repairs(AS Plant)
MP-248 P2 Secondary Clarifier Repairs(AS Plant) W.M.Lyles Company 06/26/2019 $3,048,000 $0 $3,048,000 10.0% 10.0% 0.0% 10.0%
P3-101 Sludge Dewatering and Odor Control at Plant 1
P1-101 Sludge Dewatering and Odor Control at Plant 1 WM Lyles Company 11/28/2012 $126,908,300 $11,780,048 $138,688,348 3.0% 11.5% 9.3% 2.2%
P3-115 Title 24 Access Compliance and Building Rehabilitation Project
P1-115B Rehabilitation of Fleet Services Building,Building 8 and ODC Engineering&Technology 09/11/2017 $2,235,563 $39,175 $2,274,738 10.0% 10.0% 1.8% 8.2%
Paving Area
132-110 Consolidated Demolition and Utility Improvements at Plant 2
P2-110 Consolidated Demolition and Utility Improvements at Flatiron West Inc 02/09/2017 $16,730,000 $836,890 $17,566,890 8.0% 8.0% 5.0% 3.0%
Plant 2
132-92 Sludge Dewatering and Odor Control at Plant 2
P2-92 Sludge Dewatering and Odor Control at Plant 2 Shimmick Construction Co.,Inc. 01/12/2015 $49,850,000 $1,462,763 $51,312,763 5.0% 5.0% 2.9% 2.1%
P2-92A Truck Loading Bay Odor Control at Plant 2 Kiewit Infrastructure West Co. 01/09/2017 $3,304,000 $329,558 $3,633,558 10.0% 14.0% 10.0% 4.0%
132-98 Primary Treatment Rehabilitation at Plant 2
P2-986 B/C-Side Primary Clarifiers Interim Repair at Plant 2 Myers&Sons Construction,LLC 101/23/20191 $8,665,000 1 $0 1 $8,665,000 10.0% 10.0% 0.0% 10.0%
TOTAL 1$389,241,739 1 $15,516,208 1$404,757,947
Page 5 of 17
-_< ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
Table 2-Construction Contracts Closed in Last Quarter
Date Board Award Change Final Contract Original Current Contingency
Project/Contract Contractor Closed Date Awarded Value Orders Value Contingency Contingency Used
J-126 Safety Improvements Program
J-126E Roof Fall Protection and Skylights Access Pacific 04/02/2019 10/26/2017 $418,000 ($1,024) $416,976 10.0% 10.0% 0%
J-126R Machine Guarding at Plant 1 Filanc 04/01/2019 10/10/2018 $210,347 ($25,718) $184,629 10.0% 10.0% 0%
M-FE Small Construction Projects Program
FE16-10 East Basin Distribution Box Repair Howard Ridley Co.Inc. 06/13/2019 04/26/2018 $529,350 $0 $529,350 10.0% 10.0% 0%
FE16-14 Slater Pump Station Valve Replacements JPCL CONSTRUCTION,INC. 06/04/2019 08/22/2018 $459,674 $45,805 $505,479 10.0% 10.0% 10%
Total $1,617,371 $19,063 $1,636,434
Page 6 of 17
SANITORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
90 For the period ending June 30, 2019
THE EMV
PART 2 — DESIGN CONSULTANT AGREEMENTS
The Sanitation District engages engineering consultants through Professional Design
Services Agreements (PDSAs ), Professional Consultant Services Agreements (PCSAs),
and Master Professional Services Agreements (Master Agreements). PDSAs are used
to obtain design engineering services, and PCSAs are a subsequent agreement with the
design consultant to provide support services during construction.
Master Agreements are issued to a pool of pre-qualified consultants for smaller projects.
On those smaller projects, the Sanitation District solicits task order proposals from three
or four of the firms and awards a task order to the most qualified consultant. There are
currently seven sets of Master Agreements.
• 2012 Master Design Agreements (expired)
• 2015 Master Design Agreements (expired)
• 2018 Master Design Agreements
• 2017 Master Agreements for CEQA Studies
• 2017 Master Agreements for Collection Planning Studies
• 2017 Master Agreements for Wastewater Treatment Planning Studies
The two Master Design Agreements from 2012, and 2015 have expired, meaning no new
task orders can be issued under them, but previously-issued task orders remain active
until completed. Task Orders are limited by Sanitation District Ordinance No. OCSD-52
$300,000 per task order.
A status table for all Active Engineering Services Agreements (PDSAs and PCSAs) is
attached under Table 3, and a status table for all Active Task Orders by Master
Agreement is attached under Table 4 (Master Agreements).
Page 7 of 17
ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30,2019
Table 3-Active Engineering Services Agreements
Award Board Award Current Contract Original Current Contingency
Project/Contract Consultant Date Value Amendments Value Contingency Contingency Used
2-41-8 SARI Rock Stabilizers Removal
2-41-8 SARI Rock Stabilizers Removal PCSA Michael Baker International,Inc. 09/26/2018 $215,129 $0 $215,129 10.0% 10.0% 0.0%
2-72 Newhope-Placentia Trunk Replacement
2-72 Newhope-Placentia Trunk Replacement PCSA Lee&Ro 03/23/2016 $3,253,946 $0 $3,253,946 10.0% 10.0% 0.0%
2-72 Newhope-Placentia Trunk Replacement PDSA Lee&Ro 10/22/2014 $8,468,232 $434,974 $8,903,206 10.0% 10.0% 5.1%
3-62 Westminster Blvd Force Main Replacement
3-62 Westminster Blvd Force Main Replacement PDSA Stantec Consulting Services,Inc. 07/22/2015 $6,917,175 ($1,339,457) $5,577,718 10.0% 10.0% 0.0%
3-64 Rehabilitation of Western Regional Sewers
3-64 Rehabilitation of Western Regional Sewers PDSA AECOM Technical Services,Inc. 01/27/2016 $17,639,250 $721,258 $18,360,508 10.0% 10.0% 4.1%
5-60 Newport Force Main Rehabilitation
5-60 Newport Force Main Rehabilitation PCSA Brown and Caldwell 04/29/2014 $2,231,925 $839,714 $3,071,639 8.0% 38.7% 37.6%
5-67 Bay Bridge Pump Station Replacement
5-67 Bay Bridge Pump Station Replacement PDSA Arcadis US Inc. 10/25/2017 $7,137,000 $295,168 $7,432,168 10.0% 10.0% 4.1%
6-17 District 6 Trunk Sewer Relief
6-17 District 6 Trunk Sewer Relief PCSA RMC Water&Environment 10/10/2016 $290,000 $0 $290,000 15.0% 15.0% 0.0%
J-117 Ocean Outfall System Rehabilitation
J-117A Interplant Effluent Pipeline Rehabilitation PCSA Brown and Caldwell 05/24/2018 $1,121,666 $0 $1,121,666 10.0% 10.0% 0.0%
J-117B Outfall Low Flow Pump Station PCSA Brown and Caldwell 12/19/2018 $8,563,913 $0 $8,563,913 10.0% 10.0% 0.0%
J-124 Digester Gas Facilities Rehabilitation
J-124 Digester Gas Facilities Rehabilitation PDSA Brown and Caldwell 11/15/2017 $11,770,000 $50,000 $11,820,000 10.0% 10.0% 0.4%
J-126 Safety Improvements Program
J-126 Safety Improvements Program" PDSA Arcadis 08/29/2016 $1,540,000 $1,500,000 $3,040,000 10.0% 5.1% 0.0%
J-128 Project Management Information System
J-128 Project Management Information System Other PMWeb,Inc. 05/24/2017 $1,022,500 $74,525 $1,097,025 20.0% 20.0% 7.3%
M-FE Small Construction Projects Program
FE16-11 Lane Channel Crossing PSA HDR Engineering,Inc. 06/28/2017 $131,939 $0 $131,939 10.0% 10.0% 0.0%
M-RESEAF Research Program
RE17-02 Biogas Scrubber Evaluation PSA Carollo Engineers,Inc. 04/21/2017 $656,783 $0 $656,783 0.0% 0.0% 0.0%
M-STUDIE Planning Studies Program
PS15-02 Edinger Pump Station Rehabilitation Study PSA Lockwood,Andrews&Newman,Inc. 12/20/2017 $505,042 $0 $505,042 10.0% 10.0% 0.0%
PS15-06 Seismic Evaluation of Structures at Plant Nos.1 and PSA Geosyntec Consultants,Inc. 06/28/2017 $2,578,028 $85,358 $2,663,386 10.0% 10.0% 3.3%
2
PS15-08 Collections Capacity Evaluation Study PSA RMC Water&Environment 08/24/2016 $2,802,675 $19,372 $2,822,047 10.0% 10.0% 0.7%
PS16-01 Stormwater Master Plan PSA Michael Baker International,Inc. 07/26/2017 $715,300 $54,839 $770,139 10.0% 10.0% 7.7%
PS17-03 Active Fault Location Study at Plant No.2 PSA Lettis Consultants International,Inc. 03/06/2019 $868,286 $0 $868,286 10.0% 10.0% 0.0%
PS17-08 CECIA-Facilities Master Plan PSA Dudek 02/27/2019 $812,709 $0 $812,709 10.0% 10.0% 0.0%
P1-101 Sludge Dewatering and Odor Control at Plant 1
P1-101 Sludge Dewatering and Odor Control at Plant 1 PCSA HDR Engineering,Inc. 06/28/2012 $7,140,000 $2,141,866 $9,281,866 8.0% 35.0% 30.0%
P1-105 Headworks Rehabilitation at Plant 1
P1-105 Headworks Rehabilitation at Plant 1 1 PDSA ICarollo Engineers,Inc. 05/27/2015 $17,528,957 $7,659,692 $25,188,649 10.0% 51.0% 43.7%
P1-128 Headquarters Complex
P1-128 Headquarters Complex I PDSA 1HDR Engineering,Inc. 06/22/2016 $11,785,709 ($878,554) $10,907,155 10.0% 10.0% 0.0%
PSA I LSA Associates,Inc. 08/11/2016 $420,927 $0 $420,927 10.0% 10.0% 0.0%
Page 8 of 17
ORANGE COUNTY SANITATION DISTRICT
W- "z-
Capital Contract Performance Report
Improvement ProgramFor the period ending June 30,2019
.
Table 3-Active Engineering Services Agreements
Award Board Award Current Contract Original Current Contingency
Project/Contract I Consultant Date Value Amendments Value Contingency Contingency Used
P1-129 Return Activated Sludge Piping Replacement at Activated Sludge Plant No.1
P1-129 Return Activated Sludge Piping Replacement at PDSA AECOM Technical Services,Inc. 06/20/2017 $523,039 $27,015 $550,054 10.0% 10.0% 5.2%
Activated Sludge Plant No.1
132-110 Consolidated Demolition and Utility Improvements at Plant 2
P2-110 Consolidated Demolition and Utility Improvements PCSA Stantec Consulting Services,Inc. 01/25/2017 $1,499,839 $0 $1,499,839 10.0% 10.0% 0.0%
at Plant 2
P2-122 Headworks Modifications at Plant 2 for GWRS Final Expansion
P2-122 Headworks Modifications at Plant 2 for GWRS Final PDSA CDM Smith Inc. 05/24/2017 $5,319,930 $0 $5,319,930 10.0% 10.0% 0.0%
Expansion
132-123 Return Activated Sludge Piping Replacement at Plant 2
P2-123 Return Activated Sludge Piping Replacement at PDSA SPEC Services,Inc. 02/15/2018 $668,217 $0 $668,217 10.0% 10.0% 0.0%
Plant 2
132-124 Interim Food Waste Receiving Facility
P2-124 Interim Food Waste Receiving Facility PDSA Kennedy/Jenks Consultants 09/05/2018 $695,000 $0 $695,000 10.0% 10.0% 0.0%
112-92 Sludge Dewatering and Odor Control at Plant 2
P2-92 Sludge Dewatering and Odor Control at Plant 2 PCSA jBrown and Caldwell 12/17/2014 $4,798,328 $0 $4,798,328 10.0% 10.0% 0.0%
112-98 Primary Treatment Rehabilitation at Plant 2
P2-98 Primary Treatment Rehabilitation at Plant 2 PDSA Black&Veatch 07/27/2016 $18,141,423 $1,279,488 $19,420,911 10.0% 10.0% 7.1%
P2-98B B/C-Side Primary Clarifiers Interim Repair at Plant 2 PCSA Black&Veatch 01/23/2019 $549,534 $0 $549,534 10.0% 10.0% 0.0%
SP-196 Process Control Systems Upgrades Study
SP-196 Process Control Systems Upgrades Study PSA Stantec Consulting Services,Inc. 03/01/2018 $1,389,866 $9,000 $1,398,866 10.0% 10.0% 0.6%
Total 1$149,702,267 $12,974,258 $162,676,525
**Ammended by Board Action
Page 9 of 17
- ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
Table 4-Active Task Orders by Master Agreement
Master Agreement/Project Consultant Award Date Order Value Original Task Amendments Current Task
Order Value
2012 Master Professional Design Service Agreements
FE10-21 Area 02 Craig Regional Park Manhole Improvements GHD 10/8/2012 $58,440 $41,560 $100,000
2015 Master Professional Design Service Agreements
FE14-05 Plant No.1 Fleet Services UST Leak Remediation Dudek 9/1/2015 $86,116 $73,137 $159,253
FE16-14 Slater Pump Station Valve Replacements Dudek 11/6/2017 $175,500 $0 $175,500
PS17-02 Guidelines for Development in the Area of OCSD Facilities AECOM 8/21/2017 $93,187 $0 $93,187
2017 Master Agreements for Wastewater Treatment Studies
P1-101 Spill Prevention,Control,and Countermeasure Plan for Sludge Dewatering and Odor AECOM 06/27/2018 $28,216 $10,935 $39,151
Control at Plant No.1
PS17-10 Emergency Overflow Weirs,Wing Wall Structural and Geotechnical Investigations HDR Engineering,Inc. 05/21/2019 $260,415 $0 $260,415
PS18-01 Asset Management Plan Development HDR Engineering,Inc. 04/03/2019 $274,777 $0 $274,777
PS18-05 Plant No.2 Future Site Plan Development Brown and Caldwell 05/22/2019 $122,389 $0 $122,389
2017 Master Agreements for Collection Planning Studies
No Task Orders Issued -- -- -- --
2017 Master Agreements for CEQA Studies
No Task Orders Issued -- -- -- --
2018 Master Professional Design Service Agreements
J-127 Natural Gas Pipelines Replacement at Plant Nos.1 and 2 Black&Veatch 1/21/2019 $271,964 $0 $271,964
Total $1,371,004 $125,632 $1,496,636
Page 10 of 17
SANITORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
90 ME For the period ending June 30, 2019
� a`
PART 3 — MASTER BUDGET PROJECTS
The Board-adopted budget for Fiscal Years 2018-19 and 2019-20 includes master
program budgets that allow staff to more quickly initiate, execute, and manage smaller
projects that fit within the scope of a particular program. The projects chartered under
these program budgets are referred to as sub-projects and are managed to the same
standards as projects specifically listed in the adopted budget. A status table for each of
these programs listing the sub-projects is attached.
Master Program Title Status Table
Planning Studies Program Table 5
Research Program Table 6
Small Construction Projects Program Table 7
Information Technology Capital Program Table 8
Operations & Maintenance Capital Program Table 9
Page 11 of 17
40J�S� SAW JgT Oy ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
9O�FC''G T M E EN POa��@
Table 5 - Planning Studies Status Report
Project Number Project Name Status Allocated Budget
PS15-01 PS15-01 Biosolids Master Plan Closed $ 3,496,985
PS15-02 PS15-02 Edinger Pump Station Rehabilitation Study Active $ 971,000
PS15-06 PS15-06 Seismic Evaluation of Structures at Plant Nos. 1 and 2 Active $ 3,860,000
PS15-07 PS15-07 Pressurization and Odor Control Study at Newport Beach Closed $ 344,145
PS15-08 PS15-08 Collections Capacity Evaluation Study Active $ 3,682,000
PS15-10 PS15-10 2017 Facilities Master Plan Active $ 3,850,000
PS16-01 PS16-01 Stormwater Master Plan Active $ 1,415,700
PS16-02 PS16-02 SCE Feed Reliability Improvements Study Active $ 293,000
PS16-04 PS16-04 Rectangular Primary Clarifier Reliability Study at Plant No. 1 Closed $ 298,389
PS17-01 PS17-01 Fire Flow Testing at Plant No. 1 Closed $ 28,043
PS17-02 PS17-02 Guidelines for Development in the Area of OCSD Facilities Active $ 176,000
PS17-03 PS17-03 Active Fault Location Study at Plant No. 2 Active $ 1,300,000
PS17-04 PS17-04 Office Workspace Study for Plant No 1 and 2 Active $ 110,000
PS17-08 PS17-08 CEQA- Facilities Master Plan Active $ 1,170,000
PS17-09 PS17-09 Calibration of Plant 1/Plant 2 InfoWorks Hydraulic Model Closed $ 51,996
PS17-10 PS17-10 Emergency Overflow Weirs,Wing Wall Structural and Geotechnical Inver Active $ 465,000
PS18-01 PS18-01 Asset Management Plan Development Active $ 420,000
PS18-02 PS18-02 Bushard Diversion Structure Rehabilitation Study Active $ 96,000
PS18-03 PS18-03 AS Plant Aeration Alternatives Study at Plant 2 Closed $ -
PS18-04 PS18-04 Easements Assessment Closed $ -
PS18-05 PS18-05 Plant No. 2 Future Site Plan Development Active $ 217,000
PS18-06 PS18-06 Go/No-Go Lights and Signage Active $ 495,000
PS18-07 PS18-07 ASCE Review of CIP Program Active $ 50,000
PS18-08 PS18-08 Plant 2 Cen Gen Engine Exhaust Oxidizer Catalyst Cracking Root Cause Ar Closed $ -
PS18-09 PS18-09 Ocean Outfall Condition Assessment and Scoping Study Active $ 1,850,000
PS18-10 PS18-10 Root Cause Analysis of Malfunctioning Process Units at TFSC Facility at PI Active $ 41,000
PS18-11 PS18-11 ETAP Model Updates for Plant Nos 1 and 2 Active $ 553,000
PS18-12 PS18-12 Laboratory Building Implementation Study Closed $ -
Grand Total $ 25,234,258
Number of Chartered Projects 28
Board Approved Program Budget $ 28,652,000
Remaining Unallocated Budget $ 3,417,742
Page 12 of 17
40J�S� SAW JgT Oy ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
9O�FC''G T M E EN POa��@
Table 6 - Research Program Status Report
Project Number Project Name Status Allocated Budget
RE17-01 RE17-01 Operational Research Technical Support FY18-19 Active $ 650,000
RE17-02 RE17-02 Biogas Scrubber Evaluation Active $ 865,000
RE17-03 RE17-03 Reliant Wet Well Wizard Test Active $ 74,000
RE17-04 RE17-04 AquaNereda Aerobic Granular Sludge Process Active $ 242,000
RE17-05 RE17-05 Organica FCR Process On Hold $ 242,000
RE17-06 RE17-06 TWAS Pump Reliability Improvement Trials at Plant No. 2 Closed $ 10,159
RE17-07 RE17-07 Super Oxygenation System Research at Seal Beach Pump Station Cancelled $ 80,000
RE18-01 RE18-01 Trickling Filter Bleach Test at Plant No. 1 Active $ 125,000
RE18-02 RE18-02 Protein Matrix Demonstration Study at Plant No 1 Active $ 150,000
Grand Total $ 2,438,159
Number of Chartered Projects 9
Board Approved Program Budget $ 8,500,000
Remaining Unallocated Budget $ 6,061,841
Page 13 of 17
ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
6 NE M P
Table 7-Small Construction Projects Program Status Report
Project Number Project Name Status Allocated Budget
FE10-21 FE10-21 Area 02 Craig Regional Park Manhole Improvements Active $ 1,359,000
FE12-10 FE12-10 IT Server Room Cooling Improvements Closed $ 956,086
FE13-04 FE13-04 Plant No.2 Trickling Filter Chemical Odor Control Closed $ 4,745,752
FE14-03 FE14-03 Rehabilitation of Digester Mixing Pumps at P2 Digesters E,H,R,S,and T Active $ 1,360,000
FE14-05 FE14-05 Plant No.1 Fleet Services UST Leak Remediation Active $ 1,487,311
FE15-01 FE15-01 Fullerton Creek Channel Crossing Closed $ 84,640
FE15-06 FE15-06 Gas Compressor Building Piping Replacement at Plant 2 Closed $ 1,605,540
FE15-07 FE15-07 Secondary Treatment and Plant Water VFD Replacement at Plant 1 Active $ 3,319,600
FE15-09 FE15-09 CenGen Hot Water Pipe Bracing at Plant 1 Active $ 425,000
FE15-10 FE15-10 East Lido Force Main Rehabilitation Active $ 2,228,000
FE16-01 FE16-01 Big Canyon Nature Park Improvements Closed $ 29,915
FE16-02 FE16-02 Jamboree Sewer Realignment at Big Canyon Closed $ 54,434
FE16-05 FE16-05 Buried Water Valve Support Upgrades at Plant 2 Active $ 250,000
FE16-06 FE16-06 Fuel Cell Facilities Demolition Active $ 900,000
FE16-08 FE16-08 Carbon Canyon Clay Pipe Repairs Closed $ 648,756
FE16-10 FE16-10 East Basin Distribution Box Repair Active $ 1,021,960
FE16-11 FE16-11 Lane Channel Crossing Active $ 500,000
FE16-12 FE16-12 Garfield Road Perimeter Security Fence Closed $ 37,410
FE16-13 FE16-13 Collections Infrastructure Relocation at Plant 2,Phase 1B Closed $ 93,747
FE16-14 FE16-14 Slater Pump Station Valve Replacements Active $ 1,050,000
FE17-01 FE17-01 Carbon Canyon Pipeline Sag Repairs Active $ 783,000
FE17-03 FE17-03 Battery Storage System at Plant No.1 Active $ 571,000
FE17-04 FE17-04 Storm Water Compliance Improvements at 3 Pump Stations Closed $ 8,929
FE17-05 FE17-05 Plant 1 ICS Network Extension Active $ 950,000
FE17-06 FE17-06 Tustin Ave Manhole and Pipe Repair Active $ 273,000
FE17-07 FE17-07 Fruit Street Trunk Sewer Relocation-OC Streetcar Closed $ 8,474
FE17-08 FE17-08 Big Canyon Trunk Sewer Realignment-BCCC Maintenance Yard Active $ 130,000
FE18-01 FE18-01 Interim Relocation to 18350 Mt.Langley Active $ 665,000
FE18-02 FE18-02 Jamboree Sewer Transfer Closed $ 300,000
FE18-03 FE18-03 Building 6 Staff Consolidation Closed $ -
FE18-04 FE18-04 Activated Sludge Basin Lighting Repair at Plant No.2 Active $ 1,600,000
FE18-05 FE18-05 Plant Water Pipe Replacement at AS 1 at Plant No.1 Closed $ -
FE18-06 FE18-06 CenGen Instrument Air Compressors Replacement at Plant No.1 and Nc Active $ 1,450,000
FE18-07 FE18-07 Pump Station Electrical Bypass Improvements Closed $ -
FE18-08 FE18-08 West Trunk Bypass Sewer Realignment Active $ 98,000
FE18-10 FE18-10 Mt Langley HVAC Replacement and Upgrades Active $ 560,000
FE18-11 FE18-11 Headworks Explosive Gas Monitoring Systems at Plant No.1 and No.2 Active $ 335,000
FE18-12 FE18-12 Erosion Control at Santa Ana River and Hamilton Ave Active $ 245,000
FE18-13 FE18-13 Redhill Relief Sewer Protection at State Route 55 Active $ 520,000
FE18-14 FE18-14 Plant Water Pipeline Replacement in Kinnison,Lindstrom,and Scott Tun Active $ 1,425,000
FE18-15 FE18-15 Plant Boiler System Relief at Plant No.2 Active $ 180,000
FE18-16 FE18-16 Truck Loading Basement Drain Modifications at Plant No.1 Active $ 440,000
FE18-17 FE18-17 Trunkline Sampler Power Feed at Plant No 2 Closed $ 160,000
FE18-18 FE18-18 Portable Generator Connector at Lido Pump Station Active $ 106,000
FE18-19 FE18-19 12KV Distribution B and East RAS Pump Station Roofing Replacement Active $ 600,000
FE18-20 FE18-20 Blower Building No.1 Air Compressors at Plant No.1 Active $ 1,200,000
FE19-01 FE19-01 Portable Generator Connectors at Nine Pump Stations Closed $ 1,300,000
Grand Total $ 36,065,554
Total Chartered Project 47
Board Approved Program Budget $ 53,250,000
Remaining Unallocated Budget $ 17,184,446
Page 14 of 17
40J�S� SAW JgT Oy ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
9O�FC''G T M E EN POa��@
Table 8 - Information Technology Capital Program Status Report
Project Number Project Name Status Allocated Budget
IT16-03 IT16-03 Plant 2 Internet Connection Active $ 50,000
IT16-05 IT16-05 Plant 2 Radio Repeater Upgrade Closed $ 35,000
IT16-06 IT16-06 Network Equipment 2016-17 Closed $ 44,302
IT16-07 IT16-07 Server Replacement and Obsolescence Closed $ 337,332
IT16-08 IT16-08 IT Security 2016-17 Active $ 162,000
IT16-09 IT16-09 iPACS Enhancements Active $ 85,000
IT16-10 IT16-10 LIMS Compliance Improv Project Active $ 754,800
IT16-11 IT16-11 Business Continuity Plan Active $ 140,000
IT17-01 IT17-01 VMWare Active $ 800,000
IT17-02 IT17-02 Upgrade Active Directory Directory to 2016 Active $ 56,000
IT17-03 IT17-03 Upgrade ShoreTel System Server Active $ 190,000
IT17-04 IT17-04 PCI Improvements Closed $ 131,093
IT17-05 IT17-05 Conference Room Monitor Upgrade Active $ 75,686
IT17-06 IT17-06 Printer Obsolescence Active $ 350,000
IT17-07 IT17-07 Safety Management Suite Active $ 106,000
IT17-08 IT17-08 Perimeter Physical Security Im Closed $ 170,077
IT17-09 IT17-09 MYOCSD Redesign Closed $ 170,077
IT17-10 IT17-10 Electronic Operator Round Form Active $ 45,000
IT17-11 IT17-11 P2 Radio Repeater Closed $ 170,077
IT17-12 IT17-12 Sever/Network Power Improvements Active $ 90,000
IT17-13 IT17-13 Graphric Workstations for PAO Closed $ 15,000
IT17-14 IT17-14 Specialized Application Programing&Support Active $ 600,000
IT17-15 IT17-15 Data Storage Replac/Obsolescens Active $ 600,000
IT18-02 IT18-02 Fleet Management Information System Active $ 250,000
IT18-03 IT18-03 Timecard Systems Upgrade Active $ 150,000
IT18-04 IT18-04 Conference Rooms Audio System Replacement Active $ 90,000
IT18-05 IT18-05 Trusted System Document Management Active $ 100,000
IT18-06 IT18-06 Server Replacement and Obsolescence FY18/19-19/20 Active $ 900,000
IT18-07 IT18-07 Network Equipment FY18/19-19/20 Active $ 850,000
IT18-09 IT18-09 Records Management Information System Active $ 100,000
IT18-10 IT18-10 Board Services Management System Active $ 60,000
IT18-11 IT18-11 IT Security Budget 2018-2019 Active $ 150,000
Grand Total $ 7,827,444
Total Chartered Project 32
Board Approved Program Budget $ 10,000,000
Remaining Unallocated Budget $ 2,172,556
Page 15 of 17
40J�S� SAW JgT Oy ORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
For the period ending June 30, 2019
9O�FC''G T M E EN POa��@
Table 9 - Operations & Maintenance Capital Program Status Report
Project Number Project Name Status Allocated Budget
FR00001 FR00001 SALS Hidrostal Pump Active $ 212,268
FR00002 FR00002 Chopper Pump at Dig P P2 Active $ 212,268
FR00008 FR00008 Rag Bin Ramp Retrofit Active $ 33,038
FR00011 FR00011 Westside Impeller/Line Replacement Active $ 108,368
SC16-01 SC16-01 Maint.Storage Area Tool Cage Active $ 12,000
SC17-01 SC17-01 CENGEN#1 Elevator Rehab Active $ 12,000
SC17-02 SC17-02 P1 CenGen Plant Water Piping Rehabilitation Active $ 250,000
SC17-03 SC17-03 CenGen Oil Filter Platform Active $ 60,000
SC17-04 SC17-04 P1 CenGen 12KV Circuit Breaker Replacement Active $ 220,000
SC17-05 SC17-05 Hidrostal Pump-TEFC Close Coupled Motor#2 (Pump for SALS) Active $ 261,260
SC17-06 SC17-06 P1 Lab UPS System Replacement Active $ 290,294
SC18-01 SC18-01 P1 Primary Clarifier Fall Protection Improvements Active $ 50,000
SC18-02 SC18-02 Joint Cen Gen Oil Centrifuge Heater&Controls Rehabilitation (MP-18) Active $ 120,000
SC18-03 SC18-03 P1 SALS Main Duty Pump& Motor and Installation-Remaining 2 (MP-52 Active $ 500,000
SC18-04 SC18-04 Edinger UPS Replacement(MP-444) Active $ 15,000
SC18-05 SC18-05 Improvements to P1 Laboratory Boilers-New Burners(MP-485) Active $ 311,000
SC18-06 SC18-06 Pump Station Bypass Parts-Procurement(MP-426) Active $ 500,000
SC18-08 SC18-08 MacArthur Pump Station-FM Valve Replacement Active $ 55,109
SC18-09 SC18-09 Admin Bldg UPS System Replacement Active $ 185,000
SC18-10 SC18-10 P2 South Scrubber Complex Bleach Pump Turndown (MP-420) Active $ 44,900
Grand Total $ 3,452,505
Total Chartered Project 20
Board Approved Program Budget $ 15,622,000
Remaining Unallocated Budget $ 12,169,495
Page 16 of 17
SANITORANGE COUNTY SANITATION DISTRICT
Capital Improvement Program
Contract Performance Report
90 For the period ending June 30, 2019
n
PART 4 — STAFF AUGMENTATION CONTRACT
In May 2016, the Sanitation District Board of Directors approved a $41 million
professional services agreement with Jacobs Project Management Co. to provide
supplemental engineering and support staff services for a four-year term with the option
of three one-year renewals. The benefits of using staff augmentation, as opposed to
hiring full-time staff or limited-term employees, include rapid mobilization of highly
skilled/technical staff, flexibility to change the mix of staff positions on an immediate and
as-needed basis, the ability to reduce staff as workloads decrease, access to technical
experts to support special tasks, and access to staff with wastewater project experience.
A status table for the Staff Augmentation Contract Status is attached under Table 10,
and the Staff Augmentation Labor Summary can be found under Table 11.
Table 10-Staff Augmentation Contract Status
Total Fees Time
Contract $41,000,000 86 months (1)
Actuals to Date $16,404,460 40% 38 months 44%
Remaining $24,595,540 60% 48 months 56%
11)Assuming three 1-year extensions
Table 11 -Staff Augmentation Labor Summary
This Quarter Inception to Date
Labor Hours 9,777 122,111
Full Time Equivalents 21.7 21.4
Labor Costs (no expenses) $1,262,195 $16,006,931
Average Hourly Rate $129 $131
Page 17 of 17
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
OPERATIONS COMMITTEE (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-605 Agenda Date: 9/25/2019 Agenda Item No: 8.
FROM: James D. Herberg, General Manager
Originator: Kathy Millea, Director of Engineering
SUBJECT:
SUNFLOWER AND RED HILL INTERCEPTOR REPAIR, PROJECT NO. 7-66
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Professional Design Services Agreement with GHD Inc. to provide engineering
services for Sunflower and Red Hill Interceptor Repair, Project No. 7-66, for an amount not to
exceed $308,712; and
B. Approve a contingency of $30,871 (10%).
BACKGROUND
The Orange County Sanitation District (Sanitation District) completed construction of the Sunflower
Interceptor Reach 3 and Red Hill Interceptor Reach 4 and 5, Project No. 7-6-3 in 1971, ranging in
size from 27 inches to 84 inches in diameter. The concrete pipe includes PVC lining on the upper
270-degrees of the pipe section to protect the concrete from corrosive sewer gas. PVC lining was
not installed on the bottom 90 degrees because it was expected to be covered by the liquid in the
pipe, which is not corrosive to concrete.
RELEVANT STANDARDS
• Protect Orange County Sanitation District assets
PROBLEM
In 2015, as part of the Sanitation District asset management program, the pipe between Red Hill
Avenue at MacArthur Boulevard in Irvine and Sunflower Avenue at South Timber Street in Costa
Mesa was assessed for internal corrosion and lining condition. This section also includes three
siphons, but it was only possible to enter and assess one of the three siphons.
The Sanitation District's assessment indicated the PVC lining has failed at multiple locations and
concrete below the 270-degree lining has corroded.
The services of a design consultant are needed to complete this project.
Orange County Sanitation District Page 1 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-605 Agenda Date: 9/25/2019 Agenda Item No: 8.
PROPOSED SOLUTION
Approve a Professional Design Services Agreement with GHD Inc.
TIMING CONCERNS
The concrete pipe continues to corrode until a construction project is designed and completed.
RAMIFICATIONS OF NOT TAKING ACTION
Increased risk of failure of the pipe due to continued concrete corrosion causing a sewage spill and
property damage.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
Consultant Selection:
The Sanitation District requested and advertised for proposals for Sunflower and Red Hill Interceptor
Repair, Project No. 7-66, on April 30, 2019. The following evaluation criterion were described in the
Request for Proposals (RFP) and used to determine the most qualified Consultant.
CRITERION WEIGHT
Project Understanding and Approach 30%
Related Project Experience 30%
Project Team and Staff Qualifications 40%
Three proposals were received on June 10, 2019 and evaluated in accordance with the evaluation
process set forth in the Sanitation District's Purchasing Ordinance No. OCSD-52 (Purchasing
Ordinance), by a pre-selected Evaluation Team consisting of the following Sanitation District staff.
Rich Leon Project Manager
Don Stokes Maintenance Manager
William Cassidy Engineering Supervisor
The Evaluation Team also included two non-voting representatives from the Contracts Administration
Division and Engineering Division. Following scoring by the Evaluation Team, using the evaluation
criterion and weighting described above, interviews were deemed unnecessary. Based on the
ranking shown below, GHD Inc. was selected as the most qualified Consultant.
GHD Inc. LAN Inc. Atkins NA Inc.
Evaluator 1 1 St 12nd 3rd
Orange County Sanitation District Page 2 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-605 Agenda Date: 9/25/2019 Agenda Item No: 8.
Evaluator 2 1 St 2nd 3rd
Evaluator 3 1 St 3rd 2nd
Combined Ranking 1st 2nd 3rd
The selected firm's team had the best understanding of the project and most pertinent recent
experience with repairs similar to this project.
Review of Fee Proposal and Negotiations:
Proposals were accompanied by sealed fee proposals. In accordance with the Sanitation District's
Purchasing Ordinance, the fee proposal of only the highest-ranked firm was opened after approval by
the Director of Engineering of the Evaluation Committee's recommendation.
Staff conducted negotiations with GHD Inc. to clarify the requirements of the Scope of Work, the
assumptions used for the estimated level of effort, and the proposed approach to meet the goals and
objectives for the project. One negotiating meeting was held where staff and the Consultant
reviewed the Project Elements, Preliminary Design, and Final Design tasks for clarity and desired
level of effort. These negotiations modified the design process to streamline the process. As a result
of these negotiations, GHD Inc. submitted a revised fee proposal.
Original Fee Proposal Negotiated Fee
Total Hours 1,830 1,797
Total Fee $326,623 $308,712
The Consultant's fringe and overhead costs, which factor into the billing rate, have been
substantiated. The contract profit is 9.94%, which is based on an established formula included in the
Sanitation District's standard design agreements.
Based on the above, staff has determined that the final negotiated fee is fair and reasonable for the
level of effort required for this project and recommends award of the Professional Design Services
Agreement to GHD Inc.
CEQA
This project is exempt from CEQA under the Class 1 categorical exemptions set forth in California
Code of Regulations, Title 14, Section 15301 - Section 15301 (Class 1) exempts from CEQA "the
operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or
private structures, facilities, mechanical equipment, or topographical features, involving negligible or
no expansion of use beyond that existing at the time of the lead agency's determination," including
"(b) Existing facilities of both investor and publicly-owned utilities used to provide electric power,
natural gas, sewerage, or other public utility services".
The project consists of minor repairs to existing PVC lining and concrete pipe.
A Notice of Exemption will be filed with the OC Clerk-Recorder after the Sanitation District Board
award of the Professional Design Services Agreement contract.
Orange County Sanitation District Page 3 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-605 Agenda Date: 9/25/2019 Agenda Item No: 8.
FINANCIAL CONSIDERATIONS
This request complies with authority levels of the Sanitation District's Purchasing Ordinance. This
item has been budgeted, (Adopted Budget Update FY2019-20, Appendix, Page A-11) and the project
budget is sufficient for the recommended action.
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda
package:
• Professional Design Services Agreement
Orange County Sanitation District Page 4 of 4 Printed on 9/19/2019
powered by LegistarTM
PROFESSIONAL DESIGN SERVICES AGREEMENT
THIS AGREEMENT, is made and entered into to be effective the 25t" day of September,
2019, by and between the ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to
as "SANITATION DISTRICT", and GHD INC., for purposes of this Agreement hereinafter
referred to as "CONSULTANT".
WITNESSETH:
WHEREAS, the SANITATION DISTRICT desires to engage a CONSULTANT for
Sunflower and Red Hill Interceptor Repairs, Project No. 7-66; and to provide Design
services for designing repairs of damaged PVC linings and concrete on 6,000 linear feet of large
diameter concrete pipe; and,
WHEREAS, CONSULTANT is qualified to provide the necessary services in connection
with these requirements and has agreed to provide the necessary professional services; and,
WHEREAS, the SANITATION DISTRICT has adopted procedures for the selection of
professional services and has proceeded in accordance with said procedures to select a
CONSULTANT to perform this work; and,
WHEREAS, at its regular meeting on September 25, 2019 the Board of Directors, by
Minute Order, accepted the recommendation of the Director of Engineering and General
Manager pursuant to SANITATION DISTRICT's Purchasing Ordinance to approve this
Agreement between the SANITATION DISTRICT and CONSULTANT.
NOW, THEREFORE, in consideration of the promises and mutual benefits, which will
result to the parties in carrying out the terms of this Agreement, it is mutually agreed as follows:
1. SCOPE OF WORK
CONSULTANT agrees to furnish necessary professional and technical services to
accomplish those project elements outlined in the Scope of Work attached hereto as
Attachment "A", and by this reference made a part of this Agreement.
A. The CONSULTANT shall be responsible for the professional quality, technical
accuracy, completeness, and coordination of all design, drawings, specifications,
and other services furnished by the CONSULTANT under this Agreement,
including the work performed by its Subconsultants. Where approval by the
SANITATION DISTRICT is indicated, it is understood to be conceptual approval
only and does not relieve the CONSULTANT of responsibility for complying with
all laws, codes, industry standards and liability for damages caused by errors,
omissions, noncompliance with industry standards, and/or negligence on the part
of the CONSULTANT or its Subconsultants.
B. CONSULTANT is responsible for the quality of work prepared under this
Agreement and shall ensure that all work is performed to the standards of best
engineering practice for clarity, uniformity, and completeness. CONSULTANT
shall respond to all comments, suggestions, and recommendations on the
SANITATION DISTRICT's review comment sheets (i.e. DS1, DS2 and DS3). All
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 1 of 19
comments shall be incorporated into the design prior to the next submittal
deadline or addressed, in writing, as to why the comment has not been
incorporated. CONSULTANT shall ensure that each submittal is 100% accurate
for the level of work submitted (i.e. correct references, terms, capitalization or
equal status, spelling, punctuation, etc.)
C. In the event that work is not performed to the satisfaction of the SANITATION
DISTRICT and does not conform to the requirements of this Agreement or any
applicable industry standards, the CONSULTANT shall, without additional
compensation, promptly correct or revise any errors or deficiencies in its designs,
drawings, specifications, or other services within the timeframe specified by the
Project Engineer/Project Manager. The SANITATION DISTRICT may charge to
CONSULTANT all costs, expenses and damages associated with any such
corrections or revisions.
D. All CAD drawings, figures, and other work shall be produced by CONSULTANTS
and Subconsultants using the SANITATION DISTRICT CAD Manual. Conversion
of CAD work from any other non-standard CAD format to the SANITATION
DISTRICT format shall not be acceptable in lieu of this requirement.
Electronic files shall conform to the SANITATION DISTRICT specifications. Any
changes to these specifications by the CONSULTANT are subject to review and
approval of the SANITATION DISTRICT.
Electronic files shall be subject to an acceptance period of 30 calendar days
during which the SANITATION DISTRICT shall perform appropriate reviews and
including CAD Manual compliance. CONSULTANT shall correct any
discrepancies or errors detected and reported within the acceptance period at no
additional cost to the SANITATION DISTRICT.
E. The CONSULTANT shall ensure that all plans and specifications prepared or
recommended under this Agreement allow for competitive bidding. The
CONSULTANT shall design such plans or specifications so that procurement of
services, labor or materials are not available from only one source, and shall not
design plans and specifications around a single or specific product, piece of
major equipment or machinery, a specific patented design or a proprietary
process, unless required by principles of sound engineering practice and
supported by a written justification that has been approved in writing by the
SANITATION DISTRICT. The CONSULTANT shall submit this written
justification to the SANITATION DISTRICT prior to beginning work on such plans
and specifications. Whenever the CONSULTANT recommends a specific
product or equipment for competitive procurement, such recommendation shall
include at least two brand names of products that are capable of meeting the
functional requirements applicable to the project.
F. All professional services performed by the CONSULTANT, including but not
limited to all drafts, data, correspondence, proposals, reports, and estimates
compiled or composed by the CONSULTANT, pursuant to this Agreement, are
for the sole use of the SANITATION DISTRICT, its agents and employees.
Neither the documents nor their contents shall be released to any third party
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 2 of 19
without the prior written consent of the SANITATION DISTRICT. This provision
does not apply to information that (a) was publicly known, or otherwise known to
the CONSULTANT, at the time that it was disclosed to the CONSULTANT by the
SANITATION DISTRICT, (b) subsequently becomes publicly known to the
CONSULTANT other than through disclosure by the SANITATION DISTRICT.
2. COMPENSATION
Total compensation shall be paid to CONSULTANT for services in accordance with the
following provisions:
A. Total Compensation
Total compensation shall be in an amount not to exceed Three Hundred Eight
Thousand Seven Hundred Twelve Dollars ($308,712). Total compensation to
CONSULTANT including burdened labor (salaries plus benefits), overhead,
profit, direct costs, and Subconsultant(s) fees and costs shall not exceed the sum
set forth in Attachment "E" - Fee Proposal.
B. Labor
As a portion of the total compensation to be paid to CONSULTANT, the
SANITATION DISTRICT shall pay to CONSULTANT a sum equal to the
burdened salaries (salaries plus benefits) actually paid by CONSULTANT
charged on an hourly-rate basis to this project and paid to the personnel of
CONSULTANT. Upon request of the SANITATION DISTRICT, CONSULTANT
shall provide the SANITATION DISTRICT with certified payroll records of all
employees' work that is charged to this project.
C. Overhead
As a portion of the total compensation to be paid to CONSULTANT, the
SANITATION DISTRICT shall compensate CONSULTANT and Subconsultants
for overhead at the rate equal to the percentage of burdened labor as specified in
Attachment "E" - Fee Proposal.
D. Profit
Profit for CONSULTANT and Subconsultants shall be a percentage of consulting
services fees (Burdened Labor and Overhead). When the consulting or
subconsulting services amount is $250,000 or less, the maximum Profit shall be
10%. Between $250,000 and $2,500,000, the maximum Profit shall be limited by
a straight declining percentage between 10% and 5%. For consulting or
subconsulting services fees with a value greater than $2,500,000, the maximum
Profit shall be 5%. Addenda shall be governed by the same maximum Profit
percentage after adding consulting services fees.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 3 of 19
As a portion of the total compensation to be paid to CONSULTANT and
Subconsultants, the SANITATION DISTRICT shall pay profit for all services
rendered by CONSULTANT and Subconsultants for this project according to
Attachment "E" - Fee Proposal.
E. Subconsultants
For any Subconsultant whose fees for services are greater than or equal to
$100,000 (excluding out-of-pocket costs), CONSULTANT shall pay to
Subconsultant total compensation in accordance with the Subconsultant amount
specified in Attachment "E" - Fee Proposal.
For any Subconsultant whose fees for services are less than $100,000,
CONSULTANT may pay to Subconsultant total compensation on an hourly-rate
basis and as specified in the Scope of Work. The SANITATION DISTRICT shall
pay to CONSULTANT the actual costs of Subconsultant fees and charges in an
amount not to exceed the sum set forth in Attachment "E" - Fee Proposal.
F. Direct Costs
The SANITATION DISTRICT shall pay to CONSULTANT and Subconsultants
the actual costs of permits and associated fees, travel and licenses for an
amount not to exceed the sum set forth in Attachment "E" - Fee Proposal. The
SANITATION DISTRICT shall also pay to CONSULTANT actual costs for
equipment rentals, leases or purchases with prior approval of the SANITATION
DISTRICT. Upon request, CONSULTANT shall provide to the SANITATION
DISTRICT receipts and other documentary records to support CONSULTANT's
request for reimbursement of these amounts, see Attachment "D" - Allowable
Direct Costs. All incidental expenses shall be included in overhead pursuant to
Section 2 - COMPENSATION above.
G. Other Direct Costs
Other Direct Costs incurred by CONSULTANT and its Contractor due to
modifications in scope of work resulting from field investigations and field work
required by Contract. These items may include special equipment, test
equipment and tooling and other materials and services not previously identified.
Refer to attachment "D" Allowable Direct Costs for payment information.
H. Reimbursable Direct Costs
The SANITATION DISTRICT will reimburse the CONSULTANT for reasonable
travel and business expenses as described in this section and further described in
Attachment "D" - Allowable Direct Costs to this Agreement. The reimbursement of
the above-mentioned expenses will be based on an "accountable plan" as
considered by Internal Revenue Service (IRS). The plan includes a combination of
reimbursements based upon receipts and a "per diem" component approved by
IRS. The most recent schedule of the per diem rates utilized by the SANITATION
DISTRICT can be found on the U.S. General Service Administration website at
http://www.gsa.gov/portal/category/l 04711#.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 4 of 19
The CONSULTANT shall be responsible for the most economical and practical
means of management of reimbursable costs inclusive but not limited to travel,
lodging and meals arrangements. The SANITATION DISTRICT shall apply the
most economic and practical method of reimbursement which may include
reimbursements based upon receipts and/or"per diem" as deemed the most
practical.
CONSULTANT shall be responsible for returning to the SANITATION DISTRICT
any excess reimbursements after the reimbursement has been paid by the
SANITATION DISTRICT.
Travel and travel arrangements —Any travel involving airfare, overnight stays or
multiple day attendance must be approved by the SANITATION DISTRICT in
advance.
Local Travel is considered travel by the CONSULTANT within the SANITATION
DISTRICT general geographical area which includes Orange, Los Angeles,
Ventura, San Bernardino, Riverside, San Diego, Imperial and Kern Counties.
Automobile mileage is reimbursable if CONSULTANT is required to utilize
personal vehicle for local travel.
Lodging — Overnight stays will not be approved by the SANITATION DISTRICT for
local travel. However, under certain circumstances overnight stay may be allowed
at the discretion of the SANITATION DISTRICT based on reasonableness of
meeting schedules and the amount of time required for travel by the
CONSULTANT. Such determination will be made on a case-by-case basis and at
the discretion of the SANITATION DISTRICT.
Travel Meals — Per-diem rates as approved by IRS shall be utilized for travel
meals reimbursements. Per diem rates shall be applied to meals that are
appropriate for travel times. Receipts are not required for the approved meals.
Additional details related to the reimbursement of the allowable direct costs are
provided in the Attachment "D" -Allowable Direct Costs of this Agreement.
I. Limitation of Costs
If, at any time, CONSULTANT estimates the cost of performing the services
described in CONSULTANT's Proposal will exceed seventy-five percent (75%) of
the not-to-exceed amount of the Agreement, including approved additional
compensation, CONSULTANT shall notify the SANITATION DISTRICT
immediately, and in writing. This written notice shall indicate the additional
amount necessary to complete the services. Any cost incurred in excess of the
approved not-to-exceed amount, without the express written consent of the
SANITATION DISTRICT's authorized representative shall be at CONSULTANT's
own risk. This written notice shall be provided separately from, and in addition to
any notification requirements contained in the CONSULTANT's invoice and
monthly progress report. Failure to notify the SANITATION DISTRICT that the
services cannot be completed within the authorized not-to-exceed amount is a
material breach of this Agreement.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 5 of 19
3. REALLOCATION OF TOTAL COMPENSATION
The SANITATION DISTRICT, by its Director of Engineering, shall have the right to
approve a reallocation of the incremental amounts constituting the total compensation,
provided that the total compensation is not increased.
4. PAYMENT
A. Monthly Invoice: CONSULTANT shall include in its monthly invoice, a detailed
breakdown of costs associated with the performance of any corrections or
revisions of the work for that invoicing period. CONSULTANT shall allocate costs
in the same manner as it would for payment requests as described in this Section
of the Agreement. CONSULTANT shall warrant and certify the accuracy of these
costs and understand that submitted costs are subject to Section 11 - AUDIT
PROVISIONS.
B. CONSULTANT may submit monthly or periodic statements requesting payment
for those items included in Section 2 - COMPENSATION hereof in the format as
required by the SANITATION DISTRICT. Such requests shall be based upon the
amount and value of the work and services performed by CONSULTANT under
this Agreement and shall be prepared by CONSULTANT and accompanied by
such supporting data, including a detailed breakdown of all costs incurred and
project element work performed during the period covered by the statement, as
may be required by the SANITATION DISTRICT.
Upon approval of such payment request by the SANITATION DISTRICT,
payment shall be made to CONSULTANT as soon as practicable of one hundred
percent (100%) of the invoiced amount on a per-project-element basis.
If the SANITATION DISTRICT determines that the work under this Agreement or
any specified project element hereunder, is incomplete and that the amount of
payment is in excess of:
i. The amount considered by the SANITATION DISTRICT's Director of
Engineering to be adequate for the protection of the SANITATION DISTRICT;
or
ii. The percentage of the work accomplished for each project element.
He may, at his discretion, retain an amount equal to that which insures that the
total amount paid to that date does not exceed the percentage of the completed
work for each project element or the project in its entirety.
C. CONSULTANT may submit periodic payment requests for each 30-day period of
this Agreement for the profit as set forth in Section 2 - COMPENSATION above.
Said profit payment request shall be proportionate to the work actually
accomplished to date on a per-project-element basis. In the event the
SANITATION DISTRICT's Director of Engineering determines that no satisfactory
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 6 of 19
progress has been made since the prior payment, or in the event of a delay in the
work progress for any reason, the SANITATION DISTRICT shall have the right to
withhold any scheduled proportionate profit payment.
D. Upon satisfactory completion by CONSULTANT of the work called for under the
terms of this Agreement, and upon acceptance of such work by the SANITATION
DISTRICT, CONSULTANT will be paid the unpaid balance of any money due for
such work, including any retained percentages relating to this portion of the work.
E. Upon satisfactory completion of the work performed hereunder and prior to final
payment under this Agreement for such work, or prior settlement upon
termination of this Agreement, and as a condition precedent thereto,
CONSULTANT shall execute and deliver to the SANITATION DISTRICT a
release of all claims against the SANITATION DISTRICT arising under or by
virtue of this Agreement other than such claims, if any, as may be specifically
exempted by CONSULTANT from the operation of the release in stated amounts
to be set forth therein.
F. Pursuant to the California False Claims Act (Government Code Sections 12650-
12655), any CONSULTANT that knowingly submits a false claim to the
SANITATION DISTRICT for compensation under the terms of this Agreement
may be held liable for treble damages and up to a ten thousand dollars ($10,000)
civil penalty for each false claim submitted. This Section shall also be binding on
all Subconsultants.
A CONSULTANT or Subconsultant shall be deemed to have submitted a false
claim when the CONSULTANT or Subconsultant: a) knowingly presents or causes
to be presented to an officer or employee of the SANITATION DISTRICT a false
claim or request for payment or approval; b) knowingly makes, uses, or causes to
be made or used a false record or statement to get a false claim paid or approved
by the SANITATION DISTRICT; c) conspires to defraud the SANITATION
DISTRICT by getting a false claim allowed or paid by the SANITATION DISTRICT;
d) knowingly makes, uses, or causes to be made or used a false record or
statement to conceal, avoid, or decrease an obligation to the SANITATION
DISTRICT; or e) is a beneficiary of an inadvertent submission of a false claim to
the SANITATION DISTRICT, and fails to disclose the false claim to the
SANITATION DISTRICT within a reasonable time after discovery of the false claim.
5. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) REGISTRATION
AND RECORD OF WAGES
A. To the extent CONSULTANT's employees and/or Subconsultants who will
perform Work during the design and preconstruction phases of a construction
contract for which Prevailing Wage Determinations have been issued by the DIR
and as more specifically defined under Labor Code Section 1720 et seq,
CONSULTANT and Subconsultants shall comply with the registration
requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section
1771.4, the Work is subject to compliance monitoring and enforcement by the
DIR.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 7 of 19
B. The CONSULTANT and Subconsultants shall maintain accurate payroll records
and shall comply with all the provisions of Labor Code Section 1776, and shall
submit payroll records to the Labor Commissioner pursuant to Labor Code
Section 1771.4(a)(3). Penalties for non-compliance with the requirements of
Section 1776 may be deducted from progress payments per Section 1776.
C. Pursuant to Labor Code Section 1776, the CONSULTANT and Subconsultants
shall furnish a copy of all certified payroll records to SANITATION DISTRICT
and/or general public upon request, provided the public request is made through
SANITATION DISTRICT, the Division of Apprenticeship Standards or the
Division of Labor Enforcement of the Department of Industrial Relations.
D. The CONSULTANT and Subconsultants shall comply with the job site notices
posting requirements established by the Labor Commissioner per Title 8,
California Code of Regulation Section 16461(e).
6. DOCUMENT OWNERSHIP — SUBSEQUENT CHANGES TO PLANS AND
SPECIFICATIONS
A. Ownership of Documents for the Professional Services performed.
All documents, including but not limited to, original plans, studies, sketches,
drawings, computer printouts and disk files, and specifications prepared in
connection with or related to the Scope of Work or Professional Services, shall
be the property of the SANITATION DISTRICT. The SANITATION DISTRICT's
ownership of these documents includes use of, reproduction or reuse of and all
incidental rights, whether or not the work for which they were prepared has been
performed. The SANITATION DISTRICT ownership entitlement arises upon
payment or any partial payment for work performed and includes ownership of
any and all work product completed prior to that payment. This Section shall
apply whether the CONSULTANT's Professional Services are terminated: a) by
the completion of the Agreement, or b) in accordance with other provisions of this
Agreement. Notwithstanding any other provision of this paragraph or Agreement,
the CONSULTANT shall have the right to make copies of all such plans, studies,
sketches, drawings, computer printouts and disk files, and specifications.
B. CONSULTANT shall not be responsible for damage caused by subsequent
changes to or uses of the plans or specifications, where the subsequent changes
or uses are not authorized or approved by CONSULTANT, provided that the
service rendered by CONSULTANT was not a proximate cause of the damage.
7. INSURANCE
A. General
i. Insurance shall be issued and underwritten by insurance companies
acceptable to the SANITATION DISTRICT.
i. Insurers must have an "A-" Policyholder's Rating, or better, and Financial
Rating of at least Class VIII, or better, in accordance with the most current
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 8 of 19
A.M. Best's Guide Rating. However, the SANITATION DISTRICT will accept
State Compensation Insurance Fund, for the required policy of Worker's
Compensation Insurance subject to the SANITATION DISTRICT's option to
require a change in insurer in the event the State Fund financial rating is
decreased below "B". Further, the SANITATION DISTRICT will require
CONSULTANT to substitute any insurer whose rating drops below the levels
herein specified. Said substitution shall occur within twenty (20) days of
written notice to CONSULTANT, by the SANITATION DISTRICT or its agent.
ii. Coverage shall be in effect prior to the commencement of any work under this
Agreement.
B. General Liability
The CONSULTANT shall maintain during the life of this Agreement, including the
period of warranty, Commercial General Liability Insurance written on an
occurrence basis providing the following minimum limits of liability coverage: two
million dollars ($2,000,000) per occurrence with two million dollars ($2,000,000)
aggregate. Said insurance shall include coverage for the following hazards:
Premises-Operations, blanket contractual liability (for this Agreement), products
liability/completed operations (including any product manufactured or
assembled), broad form property damage, blanket contractual liability,
independent contractors liability, personal and advertising injury, mobile
equipment, owners and contractors protective liability, and cross liability and
severability of interest clauses. A statement on an insurance certificate will not be
accepted in lieu of the actual additional insured endorsement(s). If requested by
SANITATION DISTRICT and applicable, XCU coverage (Explosion, Collapse
and Underground) and Riggers/On Hook Liability must be included in the
General Liability policy and coverage must be reflected on the submitted
Certificate of Insurance.
C. Umbrella Excess Liability
The minimum limits of general liability and Automotive Liability Insurance
required, as set forth herein, shall be provided for through either a single policy of
primary insurance or a combination of policies of primary and umbrella excess
coverage. Umbrella excess liability coverage shall be issued with limits of liability
which, when combined with the primary insurance, will equal the minimum limits
for general liability and automotive liability.
D. Automotive/Vehicle liability Insurance
The CONSULTANT shall maintain a policy of Automotive Liability Insurance on a
comprehensive form covering all owned, non-owned, and hired automobiles,
trucks, and other vehicles providing the following minimum limits of liability
coverage: Combined single limit of one million dollars ($1,000,000) or
alternatively, one million dollars ($1,000,000) per person for bodily injury and
one million dollars ($1,000,000) per accident for property damage. A statement
on an insurance certificate will not be accepted in lieu of the actual additional
insured endorsement.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 9 of 19
E. Drone Liability Insurance
If a drone will be used, drone liability insurance must be maintained by
CONSULTANT in the amount of one million dollars ($1,000,000) in form
acceptable to the SANITATION DISTRICT.
F. Worker's Compensation Insurance
The CONSULTANT shall provide such Workers' Compensation Insurance as
required by the Labor Code of the State of California in the amount of the
statutory limit, including Employer's Liability Insurance with a minimum limit of
one million dollars ($1,000,000) per occurrence. Such Worker's Compensation
Insurance shall be endorsed to provide for a waiver of subrogation in favor of the
SANITATION DISTRICT. A statement on an insurance certificate will not be
accepted in lieu of the actual endorsements unless the insurance carrier is State
of California Insurance Fund and the identifier"SCIF" and endorsement numbers
2570 and 2065 are referenced on the certificate of insurance. If an exposure to
Jones Act liability may exist, the insurance required herein shall include coverage
for Jones Act claims.
G. Errors and Omissions/Professional Liability
CONSULTANT shall maintain in full force and effect, throughout the term of this
Agreement, standard industry form professional negligence errors and omissions
insurance coverage in an amount of not less than two million dollars ($2,000,000)
with limits in accordance with the provisions of this Paragraph. If the policy of
insurance is written on a "claims made" basis, said policy shall be continued in
full force and effect at all times during the term of this Agreement, and for a
period of five (5) years from the date of the completion of the services hereunder.
In the event of termination of said policy during this period, CONSULTANT shall
obtain continuing insurance coverage for the prior acts or omissions of
CONSULTANT during the course of performing services under the term of this
Agreement. Said coverage shall be evidenced by either a new policy evidencing
no gap in coverage or by separate extended "tail" coverage with the present or
new carrier.
In the event the present policy of insurance is written on an "occurrence" basis,
said policy shall be continued in full force and effect during the term of this
Agreement or until completion of the services provided for in this Agreement,
whichever is later. In the event of termination of said policy during this period,
new coverage shall be obtained for the required period to insure for the prior acts
of CONSULTANT during the course of performing services under the term of this
Agreement.
CONSULTANT shall provide to the SANITATION DISTRICT a certificate of
insurance in a form acceptable to the SANITATION DISTRICT indicating the
deductible or self-retention amounts and the expiration date of said policy, and
shall provide renewal certificates not less than ten (10) days prior to the
expiration of each policy term.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 10 of 19
H. Proof of Coverage
The CONSULTANT shall furnish the SANITATION DISTRICT with original
certificates and amendatory endorsements effecting coverage. Said policies and
endorsements shall conform to the requirements herein stated. All certificates
and endorsements are to be received and approved by the SANITATION
DISTRICT before work commences. The SANITATION DISTRICT reserves the
right to require complete, certified copies of all required insurance policies,
including endorsements, effecting the coverage required, at any time. The
following are approved forms that must be submitted as proof of coverage:
• Certificate of Insurance ACORD Form 25 (5/2010) or equivalent.
• Additional Insurance (ISO Form) CG2010 11 85 or
(General Liability)
The combination of(ISO Forms)
CG 2010 1001 and CG 2037 1001
All other Additional Insured endorsements must
be submitted for approval by the SANITATION
DISTRICT, and the SANITATION DISTRICT
may reject alternatives that provide different or
less coverage to the SANITATION DISTRICT.
• Additional Insured Submit endorsement provided by carrier for the
(Auto Liability) SANITATION DISTRICT approval.
• Waiver of Subrogation State Compensation Insurance Fund
Endorsement No. 2570 or equivalent.
• Cancellation Notice State Compensation Insurance Fund
Endorsement No. 2065 or equivalent.
I. Cancellation Notice
Each insurance policy required herein shall be endorsed to state that coverage
shall not be cancelled by either party, except after thirty (30) days' prior written
notice. The Cancellation Section of ACORD Form 25 (5/2010) shall state the
required thirty (30) days' written notification. The policy shall not terminate, nor
shall it be cancelled, nor the coverage reduced until thirty (30) days after written
notice is given to the SANITATION DISTRICT except for nonpayment of
premium, which shall require not less than ten (10) days written notice to the
SANITATION DISTRICT. Should there be changes in coverage or an increase in
deductible or SIR amounts, the CONSULTANT and its insurance broker/agent
shall send to the SANITATION DISTRICT a certified letter which includes a
description of the changes in coverage and/or any increase in deductible or SIR
amounts. The certified letter must be sent to the attention of Risk Management,
and shall be received by the SANITATION DISTRICT not less than thirty (30)
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 11 of 19
days prior to the effective date of the change(s) if the change would reduce
coverage or increase deductibles or SIR amounts or otherwise reduce or limit the
scope of insurance coverage provided to the SANITATION DISTRICT.
J. Primary Insurance
All liability policies shall contain a Primary and Non-Contributory Clause. Any
other insurance maintained by the SANITATION DISTRICT shall be excess and
not contributing with the insurance provided by CONSULTANT.
K. Separation of Insured
All liability policies shall contain a "Separation of Insureds" clause.
L. Non-Limiting (if applicable)
Nothing in this document shall be construed as limiting in any way, nor shall it
limit the indemnification provision contained in this Agreement, or the extent to
which CONSULTANT may be held responsible for payment of damages to
persons or property.
M. Deductibles and Self-Insured Retentions
Any deductible and/or self-insured retention must be declared to the
SANITATION DISTRICT on the Certificate of Insurance. All deductibles and/or
self-insured retentions require approval by the SANITATION DISTRICT. At the
option of the SANITATION DISTRICT, either: the insurer shall reduce or
eliminate such deductible or self-insured retention as respects the SANITATION
DISTRICT; or the CONSULTANT shall provide a financial guarantee satisfactory
to the SANITATION DISTRICT guaranteeing payment of losses and related
investigations, claim administration and defense expenses.
N. Defense Costs
Liability policies shall have a provision that defense costs for all insureds and
additional insureds are paid in addition to and do not deplete any policy limits.
O. Subconsultants
The CONSULTANT shall be responsible to establish insurance requirements for
any Subconsultant hired by the CONSULTANT. The insurance shall be in
amounts and types reasonably sufficient to deal with the risk of loss involving the
Subconsultant's operations and work.
P. Limits Are Minimums
If the CONSULTANT maintains higher limits than any minimums shown above,
then SANITATION DISTRICT requires and shall be entitled to coverage for the
higher limits maintained by CONSULTANT.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 12 of 19
8. SCOPE CHANGES
In the event of a change in the Scope of Work, requested by SANITATION DISTRICT,
the parties hereto shall execute an amendment to this Agreement setting forth with
particularity all terms of the new Agreement, including but not limited to any additional
CONSULTANT's fees.
9. PROJECT TEAM AND SUBCONSULTANTS
CONSULTANT shall provide to SANITATION DISTRICT, prior to execution of this
Agreement, the names and full description of all Subconsultants and CONSULTANT's
project team members anticipated to be used on this project by CONSULTANT.
CONSULTANT shall include a description of the scope of work to be done by each
Subconsultant and each CONSULTANT's project team member. CONSULTANT shall
include the respective compensation amounts for CONSULTANT and each
Subconsultant on a per-project-element basis, broken down as indicated in Section 2 -
COMPENSATION.
There shall be no substitution of the listed Subconsultants and CONSULTANT's project
team members without prior written approval by the SANITATION DISTRICT.
10. ENGINEERING REGISTRATION
The CONSULTANT's personnel are comprised of registered engineers and a staff of
specialists and draftsmen in each department. The firm itself is not a registered
engineer but represents and agrees that wherever in the performance of this Agreement
requires the services of a registered engineer. Such services hereunder will be
performed under the direct supervision of registered engineers.
11. AUDIT PROVISIONS
A. SANITATION DISTRICT retains the reasonable right to access, review, examine,
and audit, any and all books, records, documents and any other evidence of
procedures and practices that the SANITATION DISTRICT determines are
necessary to discover and verify that the CONSULTANT is in compliance with all
requirements under this Agreement. The CONSULTANT shall include the
SANITATION DISTRICT's right as described above, in any and all of their
subcontracts, and shall ensure that these rights are binding upon all
Subconsultants.
B. SANITATION DISTRICT retains the right to examine CONSULTANT's books,
records, documents and any other evidence of procedures and practices that the
SANITATION DISTRICT determines are necessary to discover and verify all
direct and indirect costs, of whatever nature, which are claimed to have been
incurred, or anticipated to be incurred or to ensure CONSULTANT's compliance
with all requirements under this Agreement during the term of this Agreement
and for a period of three (3) years after its termination.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 13 of 19
C. CONSULTANT shall maintain complete and accurate records in accordance with
generally accepted industry standard practices and the SANITATION
DISTRICT's policy. The CONSULTANT shall make available to the
SANITATION DISTRICT for review and audit, all project related accounting
records and documents, and any other financial data within 15 days after receipt
of notice from the SANITATION DISTRICT. Upon SANITATION DISTRICT's
request, the CONSULTANT shall submit exact duplicates of originals of all
requested records to the SANITATION DISTRICT. If an audit is performed,
CONSULTANT shall ensure that a qualified employee of the CONSULTANT will
be available to assist SANITATION DISTRICT's auditor in obtaining all project
related accounting records and documents, and any other financial data.
12. LEGAL RELATIONSHIP BETWEEN PARTIES
The legal relationship between the parties hereto is that of an independent contractor
and nothing herein shall be deemed to make CONSULTANT an employee of the
SANITATION DISTRICT.
13. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of
this Agreement, or changes thereto, shall be effected by delivery of said notices in
person or by depositing said notices in the U.S. mail, registered or certified mail, return
receipt requested, postage prepaid.
Notices shall be mailed to the SANITATION DISTRICT at:
ORANGE COUNTY SANITATION DISTRICT
10844 Ellis Avenue
Fountain Valley, CA 92708-7018
Attention: Clarice Marcin, Senior Contracts Administrator
Copy: Richard Leon, Project Manager
Notices shall be mailed to CONSULTANT at:
GHD Inc.
320 Goddard Way, Suite 200
Irvine, CA 92618
Attention: Greg Watanabe, Project Principal
All communication regarding the Scope of Work, will be addressed to the Project
Manager. Direction from other SANITATION DISTRICT's staff must be approved in
writing by the SANITATION DISTRICT's Project Manager prior to action from the
CONSULTANT.
14. TERMINATION
The SANITATION DISTRICT may terminate this Agreement at any time, without cause,
upon giving thirty (30) days written notice to CONSULTANT. In the event of such
termination, CONSULTANT shall be entitled to compensation for work performed on a
prorated basis through and including the effective date of termination.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 14 of 19
CONSULTANT shall be permitted to terminate this Agreement upon thirty (30) days
written notice only if CONSULTANT is not compensated for billed amounts in
accordance with the provisions of this Agreement, when the same are due.
Notice of termination shall be mailed to the SANITATION DISTRICT and/or
CONSULTANT in accordance with Section 13 - NOTICES.
15. DOCUMENTS AND STUDY MATERIALS
The documents and study materials for this project shall become the property of the
SANITATION DISTRICT upon the termination or completion of the work. CONSULTANT
agrees to furnish to the SANITATION DISTRICT copies of all memoranda,
correspondence, computation and study materials in its files pertaining to the work
described in this Agreement, which is requested in writing by the SANITATION DISTRICT.
16. COMPLIANCE
CONSULTANT certifies by the execution of this Agreement that it pays employees not
less than the minimum wage as defined by law, and that it does not discriminate in its
employment with regard to race, color, religion, sex or national origin; that it is in
compliance with all federal, state and local directives and executive orders regarding
non-discrimination in employment; and that it agrees to demonstrate positively and
aggressively the principle of equal opportunity in employment.
17. AGREEMENT EXECUTION AUTHORIZATION
Both the SANITATION DISTRICT and CONSULTANT do covenant that each individual
executing this document by and on behalf of each party is a person duly authorized to
execute agreements for that party.
18. DISPUTE RESOLUTION
In the event of a dispute arising between the parties regarding performance or
interpretation of this Agreement, the dispute shall be resolved by binding arbitration
under the auspices of the Judicial Arbitration and Mediation Service ("JAMS"), or similar
organization or entity conducting alternate dispute resolution services.
19. ATTORNEY'S FEES, COSTS AND NECESSARY DISBURSEMENTS
If any action at law or in equity or if any proceeding in the form of an Alternative Dispute
Resolution (ADR) is necessary to enforce or interpret the terms of this Agreement, the
prevailing party shall be entitled to reasonable attorney's fees, costs and necessary
disbursements in addition to any other relief to which it may be entitled.
20. PROGRESS REPORTS
Monthly progress reports shall be submitted for review by the tenth day of the following
month and must include as a minimum: 1) current activities, 2) future activities, 3)
potential items that are not included in the Scope of Work, 4) concerns and possible
delays, 5) percentage of completion, and 6) budget status.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 15 of 19
21. WARRANTY
CONSULTANT shall perform its services in accordance with generally accepted industry
and professional standards. If, within the 12-month period following completion of its
services, the SANITATION DISTRICT informs CONSULTANT that any part of the
services fails to meet those standards, CONSULTANT shall, within the time prescribed
by the SANITATION DISTRICT, take all such actions as are necessary to correct or
complete the noted deficiency(ies).
22. INDEMNIFICATION
To the fullest extent permitted by law, CONSULTANT shall indemnify, defend (at
CONSULTANT's sole cost and expense and with legal counsel approved by the
SANITATION DISTRICT, which approval shall not be unreasonably withheld), protect
and hold harmless the SANITATION DISTRICT and all of SANITATION DISTRICT's
officers, directors, employees, CONSULTANT's, and agents (collectively the
"Indemnified Parties"), from and against any and all claims, damages, liabilities, causes
of action, suits, arbitration awards, losses,judgments, fines, penalties, costs and
expenses (including, without limitation, attorneys' fees, disbursements and court costs,
and all other professional, expert or CONSULTANT's fees and costs and the
SANITATION DISTRICT's general and administrative expenses; individually, a "Claim";
collectively, "Claims")which may arise from or are in any manner related, directly or
indirectly, to any work performed, or any operations, activities, or services provided by
CONSULTANT in carrying out its obligations under this Agreement to the extent of the
negligent, recklessness and/or willful misconduct of CONSULTANT, its principals,
officers, agents, employees, CONSULTANT's suppliers, CONSULTANT,
Subconsultants, subcontractors, and/or anyone employed directly or indirectly by any of
them, regardless of any contributing negligence or strict liability of an Indemnified Party.
Notwithstanding the foregoing, nothing herein shall be construed to require
CONSULTANT to indemnify the Indemnified Parties from any Claim arising solely from:
(A) the active negligence or willful misconduct of the Indemnified Parties; or
(B) a natural disaster or other act of God, such as an earthquake; or
(C) the independent action of a third party who is neither one of the Indemnified Parties
nor the CONSULTANT, nor its principal, officer, agent, employee, nor
CONSULTANT's supplier, CONSULTANT, Subconsultant, subcontractor, nor
anyone employed directly or indirectly by any of them.
Exceptions (A) through (B) above shall not apply, and CONSULTANT shall, to the fullest
extent permitted by law, indemnify the Indemnified Parties, from Claims arising from
more than one cause if any such cause taken alone would otherwise result in the
obligation to indemnify hereunder.
CONSULTANT's liability for indemnification hereunder is in addition to any liability
CONSULTANT may have to the SANITATION DISTRICT for a breach by
CONSULTANT of any of the provisions of this Agreement. Under no circumstances
shall the insurance requirements and limits set forth in this Agreement be construed to
limit CONSULTANT's indemnification obligation or other liability hereunder. The terms
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 16 of 19
of this Agreement are contractual and the result of negotiation between the parties
hereto. Accordingly, any rule of construction of contracts (including, without limitation,
California Civil Code Section 1654) that ambiguities are to be construed against the
drafting party, shall not be employed in the interpretation of this Agreement.
23. DUTY TO DEFEND
The duty to defend hereunder is wholly independent of and separate from the duty to
indemnify and such duty to defend shall exist regardless of any ultimate liability of
CONSULTANT and shall be consistent with Civil Code Section 2782.8. Such defense
obligation shall arise immediately upon presentation of a Claim by any person if, without
regard to the merit of the Claim, such Claim could potentially result in an obligation to
indemnify one or more Indemnified Parties, and upon written notice of such Claim being
provided to CONSULTANT. Payment to CONSULTANT by any Indemnified Party or the
payment or advance of defense costs by any Indemnified Party shall not be a condition
precedent to enforcing such Indemnified Party's rights to indemnification hereunder. In
the event a final judgment, arbitration, award, order, settlement, or other final resolution
expressly determines that the claim did not arise out of, pertain to, or relate to the
negligence, recklessness, or willful misconduct of the CONSULTANT, to any extent,
then the DISTRICT will reimburse CONSULTANT for the reasonable costs of defending
the Indemnified Parties against such claims.
CONSULTANT's indemnification obligation hereunder shall survive the expiration or
earlier termination of this Agreement until such time as action against the Indemnified
Parties for such matter indemnified hereunder is fully and finally barred by the applicable
statute of limitations.
24. CONSULTANT PERFORMANCE
The CONSULTANT's performance shall be evaluated by the SANITATION DISTRICT.
A copy of the evaluation shall be sent to the CONSULTANT for comment. The
evaluation, together with the comments, shall be retained by the SANITATION
DISTRICT and may be considered in future CONSULTANT selection processes.
25. COMPLIANCE WITH SANITATION DISTRICT POLICIES AND PROCEDURES
CONSULTANT shall comply with all SANITATION DISTRICT policies and procedures
including the OCSD Safety Standards, as applicable, all of which may be amended from
time to time.
26. CLOSEOUT
When the SANITATION DISTRICT determines that all Work authorized under the
Agreement is fully complete and that the SANITATION DISTRICT requires no further
work from CONSULTANT, or the Agreement is otherwise terminated or expires in
accordance with the terms of the Agreement, the SANITATION DISTRICT shall give the
Consultant written notice that the Agreement will be closed out. CONSULTANT shall
submit all outstanding billings, work submittals, deliverables, reports or similarly related
documents as required under the Agreement within thirty (30) days of receipt of notice of
Agreement closeout.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 17 of 19
Upon receipt of CONSULTANT's submittals, the SANITATION DISTRICT shall
commence a closeout audit of the Agreement and will either:
i. Give the CONSULTANT a final Agreement Acceptance: or
ii. Advise the CONSULTANT in writing of any outstanding item or items which must be
furnished, completed, or corrected at the CONSULTANT's cost.
CONSULTANT shall be required to provide adequate resources to fully support any
administrative closeout efforts identified in this Agreement. Such support must be
provided within the timeframe requested by the SANITATION DISTRICT.
Notwithstanding the final Agreement Acceptance the CONSULTANT will not be relieved
of its obligations hereunder, nor will the CONSULTANT be relieved of its obligations to
complete any portions of the work, the non-completion of which were not disclosed to
the SANITATION DISTRICT (regardless of whether such nondisclosures were
fraudulent, negligent, or otherwise); and the CONSULTANT shall remain obligated under
all those provisions of the Agreement which expressly or by their nature extend beyond
and survive final Agreement Acceptance.
Any failure by the SANITATION DISTRICT to reject the work or to reject the
CONSULTANT's request for final Agreement Acceptance as set forth above shall not be
deemed to be acceptance of the work by the SANITATION DISTRICT for any purpose
nor imply acceptance of, or agreement with, the CONSULTANT's request for final
Agreement Acceptance.
27. ENTIRE AGREEMENT
This Agreement constitutes the entire understanding and agreement between the
Parties and supersedes all previous negotiations between them pertaining to the subject
matter thereof.
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 18 of 19
IN WITNESS WHEREOF, this Agreement has been executed in the name of the SANITATION
DISTRICT, by its officers thereunto duly authorized, and CONSULTANT as of the day and year
first above written.
GHD INC.
By
Date
Printed Name & Title
ORANGE COUNTY SANITATION DISTRICT
By
David John Shawver Date
Board Chairman
By
Kelly A. Lore Date
Clerk of the Board
By
Ruth Zintzun Date
Purchasing & Contracts Manager
Attachments: Attachment "A" — Scope of Work
Attachment "B" — Labor Hour Matrix
Attachment "C"— Not Used (or Not Attached)
Attachment "D"—Allowable Direct Costs
Attachment "E" — Fee Proposal
Attachment "F"— Not Used (or Not Attached)
Attachment "G" — Not Used (or Not Attached)
Attachment "H"— Not Used (or Not Attached)
Attachment "I" — Cost Matrix & Summary
Attachment "J"— Not Used (or Not Attached)
Attachment "K" — Minor Subconsultant Hourly Rate Schedule (Not Used)
Attachment "L" — OCSD Safety Standards
CMM
PDSA Project No. 7-66
Revised 113018 Sunflower and Red Hill Interceptor Repairs
Page 19 of 19
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
OPERATIONS COMMITTEE (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-606 Agenda Date: 9/25/2019 Agenda Item No: 9.
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Assistant General Manager
SUBJECT:
PLANT NO. 2 EFFLUENT PUMP STATION ANNEX, VARIABLE FREQUENCY DRIVE
MODERNIZATION, AND MANUFACTURER SERVICE AGREEMENT
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve Sole Source Purchase Order to the Original Equipment Manufacturer, Siemens
Industry, Inc., to modernize three Effluent Pump Station Annex (EPSA) Variable Frequency
Drives (VFDs) for a fixed amount not to exceed $368,879, plus applicable tax and shipping;
B. Approve Sole Source Purchase Order for SIEPRO® Technical Service Agreement with
Siemens Industry, Inc. to perform annual preventative maintenance, for a three-year period,
for an amount not to exceed $68,805, plus applicable tax and shipping; and
C. Approve contingency funds of 20% for each contract, for a combined total not to exceed
$87,537.
BACKGROUND
The Orange County Sanitation District (Sanitation District) operates three 3,000 horsepower EPSA
pumps at Plant No. 2, each rated for 120 million gallons per day (mgd), designed to pump secondary
effluent through the ocean outfall system to the Pacific Ocean. These pumps are driven by a
Siemens Sinamics Perfect Harmony Medium Voltage VFD with the NXGI digital control system. They
were installed in 2008 through Project No. J-77, Effluent Pump Station Annex, that replaced Foster
Booster Pump Station.
RELEVANT STANDARDS
• Maintain a proactive asset management program
• Meet volume and water quality needs for the GWRS
• 24/7/365 treatment plant reliability
PROBLEM
The manufacturer has announced the obsolescence of critical components within the NXGI digital
Orange County Sanitation District Page 1 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-606 Agenda Date: 9/25/2019 Agenda Item No: 9.
control system of the VFD. Should any of the obsolete components fail, replacement parts are no
longer available from the manufacturer which could result in considerable downtime. In addition, the
drives are halfway through their anticipated life cycle. An increased level of major preventative
maintenance is required to maintain optimum operating conditions and increased reliability to the
process.
During construction of Project No. J-117B, Outfall Low Flow Pump Station, one or two Ocean Outfall
Booster Station (OOBS) pumps will be unavailable due to scheduled rehabilitation. At this point,
reliable EPSA pumps become increasingly critical to maintain our ocean outfall capacity.
PROPOSED SOLUTION
Award two contracts to the original equipment manufacturer, Siemens Industry, Inc. One contract is
to upgrade obsolete components in the NXGI digital control system to the latest NXG Pro to include
refurbishing the power cells. This modernization will reset the asset lifecycle to 20 years when
maintained to the manufacturer's recommendation.
The second contract is to procure a three-year Technical Service Agreement (TSA) for scheduled
annual maintenance. Under this service agreement, the Sanitation District will benefit from an 8%
discount to the upgrade and refurbishment cost of the first contract. This savings will recoup about
57% of the TSA contract cost while maintaining the highest possible uptime of the drives.
TIMING CONCERNS
Construction for Project No. J-117B and OOBS pumps rehabilitation is scheduled to start in summer
of 2020. Current plans call for completing all three drives no later than one year from Notice to
Proceed.
RAMIFICATIONS OF NOT TAKING ACTION
Reliability of ocean outfall pumping capacity is reduced and EPSA VFD failures will disrupt Project
No. J-117B.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
Due to operational constraints involved with the release of the EPSA VFDs and need for vendor to
make multiple site visits to support each VFD start-up, a 20% contingency is proposed.
CEQA
N/A
FINANCIAL CONSIDERATIONS
Orange County Sanitation District Page 2 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-606 Agenda Date: 9/25/2019 Agenda Item No: 9.
This request complies with authority levels of the Sanitation District's Purchasing Ordinance. This
recommendation would be funded under the Repairs and Maintenance line item for Operations and
Maintenance Department (Budget Update Fiscal Year 2019-20, Page 47), and the available funding
is sufficient for this action.
Date of Approval Contract Amount Contingency
09/04/2019 $437,684 $87,537 (20%)
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda
package:
N/A
RM:ab:gc
Orange County Sanitation District Page 3 of 3 Printed on 9/19/2019
powered by LegistarTM
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
OPERATIONS COMMITTEE (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-609 Agenda Date: 9/25/2019 Agenda Item No: 10.
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Assistant General Manager
SUBJECT:
ON-CALL PREVENTATIVE MAINTENANCE SERVICES FOR ELECTRICAL EQUIPMENT (MP-278)
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve a Contract to provide on-call electrical maintenance services, Specification No. S-
2019-1006BD-R, with Hampton Tedder Technical Services for a one-year period effective
November 1, 2019 through October 31, 2020, for an amount not to exceed $1,657,950, and
approve four, one-year renewal options; and
B. Approve a contingency of $82,898 (5%).
BACKGROUND
The Orange County Sanitation District (Sanitation District) maintains large electrical distribution
systems at the treatment plants and pump stations. The National Fire Protection Association (NFPA)
70B Standard, Recommended Practice for Electrical Equipment Maintenance, recommends testing
and maintenance requirements to reduce hazards to life and property that can result from failure or
malfunction of industrial-type electrical systems and equipment. The Sanitation District's electrical
distribution equipment, systems, and components must be operational within applicable NFPA 70B
standards and manufacturer's tolerances to avoid breakdown. Breakdowns can be costly failures
and may result in major disruptions. The Sanitation District's electrical equipment must be field
inspected, maintained, and calibrated at regular intervals to ensure reliability and safety.
RELEVANT STANDARDS
• Protect Orange County Sanitation District assets
• 24/7/365 treatment plant reliability
• Maintain a proactive asset management program
PROBLEM
There has been a significant increase in the number of pieces of electrical distribution equipment
installed by CIP projects that require significant labor effort to test, calibrate, and maintain. The
electrical equipment includes protective relays and circuit breakers.
Orange County Sanitation District Page 1 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-609 Agenda Date: 9/25/2019 Agenda Item No: 10.
PROPOSED SOLUTION
Sanitation District staff recommends contracting with Hampton Tedder Technical Services as the
lowest responsive and responsible bidder for on-call services to perform electrical equipment
preventive maintenance activities per NFPA 70B requirements. NFPA 70B details standardized
preventive maintenance for electrical, electronic, and communication systems equipment to prevent
equipment failures and worker injuries.
TIMING CONCERNS
Proceeding as soon as possible is desired to ensure that electrical equipment reliability and
availability is maintained at a high level within the power distribution systems.
RAMIFICATIONS OF NOT TAKING ACTION
Not taking action will mean greater risk of downtime and potential breakdowns or failures of electrical
equipment.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
The proper maintenance of the Sanitation District's electrical assets helps avoid unplanned downtime
and ensure continuous operations of our water treatment facility. To accomplish this task properly,
there is a need for additional resources. An inventory summary for the Sanitation District's key
electrical equipment is listed below:
Electrical Equipment Type Plant 1 Plant 2 Pump Station Total
Motor Control Centers 90 107 23 220
Switchgears 49 70 6 125
Variable Frequency Drives 160 134 42 336
Large Oil-Filled Transformers 53 72 0 115
Generators 12 19 9 40
Large Uninterruptible Power Supply 23 12 18 53
Battery Systems 121 117 0 138
The Sanitation District advertised for bids on May 16, 2019. Two sealed bids were received on June
18, 2019. The bids were evaluated in accordance with the Sanitation District's policies and
procedures. Staff recommends awarding a service contract to the lowest responsive and responsible
bidder, Hampton Tedder Technical Services, for on-call services to perform electrical equipment
preventive maintenance activities. This contract can address up to approximately 150 electrical
preventive maintenance tasks per year to help staff better maintain all its electrical assets and ensure
Orange County Sanitation District Page 2 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-609 Agenda Date: 9/25/2019 Agenda Item No: 10.
their reliability.
The summary information on the bid opening is as follows:
Bidder Amount of Bid
Hampton Tedder Technical Services $1,657,950
HALCO Testing Services $1,876,500
CEQA
N/A
FINANCIAL CONSIDERATIONS
This request complies with authority levels of the Sanitation District's Purchasing Ordinance. This
recommendation would be funded under the Repairs and Maintenance line item for Operations and
Maintenance Department (Budget Update Fiscal Year 2019-20, Page 47), and the available funding
is sufficient for this action.
Date of Approval Contract Amount Contingency
09/04/2019 $1,657,950 $82,898 (5%)
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda
package:
• Service Contract for Spec. No. S-2019-1006BD-R
RM:ab:ac
Orange County Sanitation District Page 3 of 3 Printed on 9/19/2019
powered by LegistarTM
SERVICE CONTRACT
ON-CALL PREVENTIVE MAINTENANCE SERVICES FOR OCSD ELECTRICAL EQUIPMENT
Specification No. S-2019-1006BD-R (Rebid)
THIS CONTRACT is made and entered into as of the date fully executed below, by and between
Orange County Sanitation District, with a principal place of business at 10844 Ellis Avenue,
Fountain Valley, CA 92708 (hereinafter referred to as "OCSD") and Hampton Tedder Technical
Services with a principal place of business at 4571 State Street, Montclair, CA 91763 (hereinafter
referred to as "Contractor") collectively referred to as the "Parties".
WITNESSETH
WHEREAS, OCSD desires to temporarily retain the services of Contractor for the On-Call
Preventive Maintenance (PM) Services for OCSD Electrical Equipment "Services" as described
in Exhibit "A"; and
WHEREAS, OCSD has chosen Contractor to conduct Services in accordance with Ordinance No.
OCSD-52; and
WHEREAS, on September 25, 2019, the Board of Directors of OCSD, by minute order, authorized
execution of this Contract between OCSD and Contractor; and
WHEREAS, Contractor is qualified by virtue of experience, training, and expertise to accomplish
such Services,
NOW, THEREFORE, in consideration of the mutual promises and mutual benefits exchanged
between the Parties, the Parties mutually agree as follows:
1. Introduction
1.1 This Contract and all exhibits hereto (called the "Contract") is made by OCSD and the
Contractor. The terms and conditions herein exclusively govern the purchase of Services
as described in Exhibit "A".
1.2 Exhibits to this Contract are incorporated by reference and made a part of this Contract as
though fully set forth at length herein.
Exhibit "A" Scope of Work
Exhibit "B" Bid
Exhibit "C" Acknowledgement of Insurance Requirements
Exhibit "D" OCSD Safety Standards
Exhibit "E" Not Used
Exhibit "F" Human Resources Policies
1.3 In the event of any conflict or inconsistency between the provisions of this Contract and any
of the provisions of the exhibits hereto, the provisions of this Contract shall in all respects
govern and control.
1.4 The provisions of this Contract may be amended or waived only by a writing executed by
authorized representatives of both Parties hereto.
Orange County Sanitation District 1 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
1.5 The various headings in this Contract are inserted for convenience only and shall not affect
the meaning or interpretation of this Contract or any paragraph or provision hereof.
1.6 The term "days", when used in the Contract, shall mean calendar days, unless otherwise
noted as business days.
1.7 OCSD holidays (non-working days) are as follows: New Year's Day, Lincoln's Birthday,
Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans Day,
Thanksgiving Day, Day after Thanksgiving, Christmas Eve, and Christmas Day.
1.8 The term "hours", when used in this Contract, shall be as defined in Exhibit "A".
1.9 Contractor shall provide OCSD with all required premiums and/or overtime work at no
charge beyond the price provided under"Compensation" below.
1.10 Except as expressly provided otherwise, OCSD accepts no liability for any expenses,
losses, or action incurred or undertaken by Contractor as a result of work performed in
anticipation of purchases of said services by OCSD.
2. Compensation Compensation to be paid by OCSD to Contractor for the Services provided
under this Contract shall be a total amount not to exceed one million six hundred fifty-seven
thousand nine hundred fifty Dollars ($1,657,950.00).
3. California Department of Industrial Relations(DIR) Re_pistration and Record of Wages
3.1 To the extent Contractor's employees and/or its subcontractors who will perform Work
during the design and preconstruction phases of a construction contract for which Prevailing
Wage Determinations have been issued by the DIR and as more specifically defined under
Labor Code Section 1720 et seq, Contractor and its subcontractors shall comply with the
registration requirements of Labor Code Section 1725.5. Pursuant to Labor Code Section
1771.4, the work is subject to compliance monitoring and enforcement by the DIR.
3.2 The Contractor and its subcontractors shall maintain accurate payroll records and shall
comply with all the provisions of Labor Code Section 1776, and shall submit payroll records
to the Labor Commissioner pursuant to Labor Code 1771.4(a)(3). Penalties for non-
compliance with the requirements of Section 1776 may be deducted from progress
payments per Section 1776.
3.3 Pursuant to Labor Code Section 1776, the Contractor and its subcontractors shall furnish a
copy of all certified payroll records to OCSD and/or general public upon request, provided
the public request is made through OCSD, the Division of Apprenticeship Standards or the
Division of Labor Standards Enforcement of the Department of Industrial Relations.
3.4 The Contractor and its subcontractors shall comply with the job site notices posting
requirements established by the Labor Commissioner per Title 8, California Code of
Regulation Section 16461(e).
4. Payments and Invoicin_g
OCSD shall pay, net thirty (30) days, upon receipt and approval, by OCSD's Project
Manager or designee, of itemized invoices submitted for each task completed in accordance
with Exhibit "A". OCSD, at its sole discretion, shall be the determining party as to whether
the Services have been satisfactorily completed and accepted.
Orange County Sanitation District 2 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
4.1 Invoices shall be emailed by Contractor to OCSD Accounts Payable at
APStaff OCSD.com and "INVOICE" with the Purchase Order Number and
S-2019-1006BD-R (Rebid) shall be referenced in the subject line.
5. Audit Rights Contractor agrees that, during the term of this Contract and for a period of
three (3) years after its termination, OCSD shall have access to and the right to examine
any directly pertinent books, documents, and records of Contractor relating to the invoices
submitted by Contractor pursuant to this Contract.
6. Scope of Work Subject to the terms of this Contract, Contractor shall perform the Services
identified in Exhibit "A". Contractor shall perform said Services in accordance with generally
accepted industry and professional standards.
7. Modifications to Scope of Work Requests for modifications to the Scope of Work
hereunder can be made by OCSD at any time. All modifications must be made in writing
and signed by both Parties.
8. Contract Term
The Services provided under this Agreement shall be for the period of one 1 year
commencing on November 1, 2019 and continuing through October 1, 2020.
9. Renewals
9.1 OCSD may exercise the option to renew this Contract for up to four (4) one-year periods
based upon the criteria set forth in Exhibit "A", under the terms and conditions contained
herein. OCSD shall make no obligation to renew nor give reason if it elects not to renew.
9.2 This Contract may be renewed by OCSD Purchase Order.
10. Extensions The term of this Contract may be extended only by written instrument signed
by both Parties.
11. Performance Time is of the essence in the performance of the provisions hereof.
12. Termination
12.1 OCSD reserves the right to terminate this Contract for its convenience, with or without
cause, in whole or in part, at any time, by written notice from OCSD of intent to terminate.
Upon receipt of a termination notice, Contractor shall immediately discontinue all work under
this Contract (unless the notice directs otherwise). OCSD shall thereafter, within thirty (30)
days, pay Contractor for work performed (cost and fee)to the date of termination. Contractor
expressly waives any claim to receive anticipated profits to be earned during the
uncompleted portion of this Contract. Such notice of termination shall terminate this
Contract and release OCSD from any further fee, cost or claim hereunder by Contractor
other than for work performed to the date of termination.
12.2 OCSD reserves the right to terminate this Contract immediately upon OCSD's determination
that Contractor is not complying with the Scope of Work requirements, if the level of service
is inadequate, or any other default of this Contract.
12.3 OCSD may also immediately cancel for default of this Contract in whole or in part by written
notice to Contractor:
■ if Contractor becomes insolvent or files a petition under the Bankruptcy Act; or
■ if Contractor sells its business; or
Orange County Sanitation District 3 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
■ if Contractor breaches any of the terms of this Contract; or
■ if total amount of compensation exceeds the amount authorized under this Contract.
12.4 All OCSD property in the possession or control of Contractor shall be returned by Contractor
to OCSD upon demand, or at the termination of this Contract, whichever occurs first.
13. Insurance Contractor and all subcontractors shall purchase and maintain, throughout the
life of this Contract and any periods of warranty or extensions, insurance in amounts equal
to the requirements set forth in the signed Acknowledgement of Insurance Requirements
(attached hereto and incorporated herein as Exhibit "C"). Contractor shall not commence
work under this Contract until all required insurance is obtained in a form acceptable to
OCSD, nor shall Contractor allow any subcontractor to commence service pursuant to a
subcontract until all insurance required of the subcontractor has been obtained. Failure to
maintain required insurance coverage shall result in termination of this Contract.
14. Bonds - NOT USED.
15. Indemnification and Hold Harmless Provision Contractor shall assume all responsibility
for damages to property and/or injuries to persons, including accidental death, which may
arise out of or be caused by Contractor's services under this Contract, or by its
subcontractor(s) or by anyone directly or indirectly employed by Contractor, and whether
such damage or injury shall accrue or be discovered before or after the termination of the
Contract. Except as to the sole active negligence of or willful misconduct of OCSD,
Contractor shall indemnify, protect, defend and hold harmless OCSD, its elected and
appointed officials, officers, agents and employees, from and against any and all claims,
liabilities, damages or expenses of any nature, including attorneys' fees: (a) for injury to or
death of any person or damage to property or interference with the use of property, arising
out of or in connection with Contractor's performance under the Contract, and/or (b) on
account of use of any copyrighted or uncopyrighted material, composition, or process, or
any patented or unpatented invention, article or appliance, furnished or used under the
Contract, and/or (c) on account of any goods and services provided under this Contract.
This indemnification provision shall apply to any acts or omissions, willful misconduct, or
negligent misconduct, whether active or passive, on the part of Contractor of or anyone
employed by or working under Contractor. To the maximum extent permitted by law,
Contractor's duty to defend shall apply whether or not such claims, allegations, lawsuits, or
proceedings have merit or are meritless, or which involve claims or allegations that any of
the parties to be defended were actively, passively, or concurrently negligent, or which
otherwise assert that the parties to be defended are responsible, in whole or in part, for any
loss, damage, or injury. Contractor agrees to provide this defense immediately upon written
notice from OCSD, and with well qualified, adequately insured, and experienced legal
counsel acceptable to OCSD.
16. OCSD Safety Standards OCSD requires Contractor and its subcontractor(s)to follow and
ensure their employees follow all Federal, State, and local regulations as well as OCSD
Safety Standards while working at OCSD locations. If during the course of the Contract it is
discovered that OCSD Safety Standards do not comply with Federal, State, or local
regulations, then the Contractor is required to follow the most stringent regulatory
requirement at no additional cost to OCSD. Contractor and all of its employees and
subcontractors, shall adhere to all applicable OCSD Safety Standards attached hereto in
Exhibit "D" and the Human Resources Policies (Exhibit "F").
17. Warranties In addition to the warranties stated in Exhibit "A", the following shall apply:
17.1 Manufacturer's standard warranty shall apply. All manufacturer warranties shall commence
Orange County Sanitation District 4 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
on the date of acceptance by the OCSD Project Manager or designee of the work as
complete.
17.2 Contractor's Warranty (Guarantee): If within a one (1) year period of completion of all work
as specified in Exhibit "A", OCSD informs Contractor that any portion of the Services
provided fails to meet the standards required under this Contract, Contractor shall, within
the time agreed to by OCSD and Contractor, take all such actions as are necessary to
correct or complete the noted deficiency(ies) at Contractor's sole expense.
18. Liquidated Damages - NOT USED.
19. Force Maieure Neither party shall be liable for delays caused by accident, flood, acts of
God, fire, labor trouble, war, acts of government or any other cause beyond its control, but
said party shall use reasonable efforts to minimize the extent of the delay. Work affected
by a Force Majeure condition may be rescheduled by mutual consent or may be eliminated
from the Contract.
20. Freight (F.O.B. Destination) Contractor assumes full responsibility for all transportation,
transportation scheduling, packing, handling, insurance, and other services associated with
delivery of all products deemed necessary under this Contract.
21. Familiarity with Work By executing this Contract, Contractor warrants that: 1) it has
investigated the work to be performed; and 2) it understands the facilities, difficulties and
restrictions of the work under this Contract. Should Contractor discover any latent or
unknown conditions materially differing from those inherent in the work or as represented
by OCSD, it shall immediately inform OCSD of this and shall not proceed, except at
Contractor's risk, until written instructions are received from OCSD.
22. Re_gulatorV Requirements Contractor shall perform all work under this Contract in strict
conformance with applicable Federal, State, and local regulatory requirements including,
but not limited to, 40 CFR 122, 123, 124, 257, 258, 260, 261, and 503, Title 22, 23, and
California Water Codes Division 2.
23. Licenses, Permits, Ordinances and Regulations Contractor represents and warrants to
OCSD that it has obtained all licenses, permits, qualifications, and approvals of whatever
nature that are legally required to engage in this work. Any and all fees required by Federal,
State, County, City and/or municipal laws, codes and/or tariffs that pertain to the work
performed under the terms of this Contract will be paid by Contractor.
24. Applicable Laws and Regulations Contractor shall comply with all applicable Federal,
State, and local laws, rules, and regulations. Contractor also agrees to indemnify and hold
harmless from any and all damages and liabilities assessed against OCSD as a result of
Contractor's noncompliance therewith. Any permission required by law to be included
herein shall be deemed included as a part of this Contract whether or not specifically
referenced.
25. Contractor's Employees Compensation
25.1 Davis-Bacon Act — Contractor will pay and will require all subcontractors to pay all
employees on said project a salary or wage at least equal to the prevailing rate of per diem
wages as determined by the Secretary of Labor in accordance with the Davis-Bacon Act for
each craft or type of worker needed to perform the Contract. The provisions of the Davis-
Bacon Act shall apply only if the Contract is in excess of two thousand dollars ($2,000.00)
and when twenty-five percent (25%) or more of the Contract is funded by Federal
Orange County Sanitation District 5 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
assistance. If the aforesaid conditions are met, a copy of the provisions of the Davis-Bacon
Act to be complied with are incorporated herein as a part of this Contract and referred to by
reference.
25.2 General Prevailing Rate — OCSD has been advised by the State of California Director of
Industrial Relations of its determination of the general prevailing rate of per diem wages and
the general prevailing rate for legal holiday and overtime work in the locality in which the
work is to be performed for each craft or type of work needed to execute this Contract, and
copies of same are on file in the Engineering Department. The Contractor agrees that not
less than said prevailing rates shall be paid to workers employed on this Contract as required
by Labor Code Section 1774 of the State of California. Per California Labor Code 1773.2,
OCSD will have on file copies of the prevailing rate of per diem wages at its principal office
and at each project site, which shall be made available to any interested party upon request.
25.3 Forfeiture For Violation—Contractor shall, as a penalty to OCSD, forfeit fifty dollars ($50.00)
for each calendar day or portion thereof for each worker paid (either by the Contractor or
any subcontractor under it) less than the prevailing rate of per diem wages as set by the
Director of Industrial Relations, in accordance with Sections 1770-1780 of the California
Labor Code for the work provided for in this Contract, all in accordance with Section 1775
of the Labor Code of the State of California.
25.4 Apprentices—Sections 1777.5, 1777.6, 1777.7 of the Labor Code of the State of California,
regarding the employment of apprentices are applicable to this Contract and the Contractor
shall comply therewith if the prime contract involves thirty thousand dollars ($30,000.00) or
more or twenty(20)working days or more; or if contracts of specialty contractors not bidding
for work through the general or prime Contractor are two thousand dollars ($2,000.00) or
more or five (5) working days or more.
25.5 Workday—In the performance of this Contract, not more than eight(8) hours shall constitute
a day's work, and the Contractor shall not require more than eight (8) hours of labor in a day
from any person employed by it hereunder. Contractor shall conform to Article 3, Chapter
1, Part 7 (Section 1810 et seq.) of the Labor Code of the State of California and shall forfeit
to OCSD as a penalty, the sum of twenty-five dollars ($25.00)for each worker employed in
the execution of this Contract by Contractor or any subcontractor for each calendar day
during which any worker is required or permitted to labor more than eight (8) hours in any
one (1) calendar day and forty (40) hours in any one (1) week in violation of said Article.
Contractor shall keep an accurate record showing the name and actual hours worked each
calendar day and each calendar week by each worker employed by Contractor in connection
with the project.
25.6 Record of Wages; Inspection — Contractor agrees to maintain accurate payroll records
showing the name, address, social security number, work classification, straight-time and
overtime hours worked each day and week, and the actual per diem wages paid to each
journeyman, apprentice, worker or other employee employed by it in connection with the
project and agrees to require that each of its subcontractors do the same. All payroll records
shall be certified as accurate by the applicable Contractor or subcontractor or its agent
having authority over such matters. Contractor further agrees that its payroll records and
those of its subcontractors shall be available to the employee or employee's representative,
the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards
and shall comply with all of the provisions of Labor Code Section 1776, in general. Penalties
for non-compliance with the requirements of Section 1776 may be deducted from project
payments per the requirements of Section 1776.
Orange County Sanitation District 6 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
26. South Coast Air Quality Management District's (SCAQMD) Requirements It is
Contractor's responsibility that all equipment furnished and installed be in accordance with
the latest rules and regulations of the South Coast Air Quality Management District
(SCAQMD). All Contract work practices, which may have associated emissions such as
sandblasting, open field spray painting or demolition of asbestos containing components or
structures, shall comply with the appropriate rules and regulations of the SCAQMD.
27. Governin_g Law This Contract shall be governed by and interpreted under the laws of the
State of California and the Parties submit to jurisdiction in the County of Orange, in the event
any action is brought in connection with this Contract or the performance thereof.
28. Breach The waiver of either party of any breach or violation of, or default under, any
provision of this Contract, shall not be deemed a continuing waiver by such party of any
other provision or of any subsequent breach or violation of this Contract or default
thereunder. Any breach by Contractor to which OCSD does not object shall not operate as
a waiver of OCSD's rights to seek remedies available to it for any subsequent breach.
29. Remedies In addition to other remedies available in law or equity, if the Contractor fails to
make delivery of the goods or Services or repudiates its obligations under this Contract, or
if OCSD rejects the goods or Services or revokes acceptance of the goods or Services,
OCSD may (1) cancel the Contract; (2) recover whatever amount of the purchase price
OCSD has paid, and/or (3) "cover" by purchasing, or contracting to purchase, substitute
goods or Services for those due from Contractor. In the event OCSD elects to "cover" as
described in (3), OCSD shall be entitled to recover from Contractor as damages the
difference between the cost of the substitute goods or Services and the Contract price,
together with any incidental or consequential damages.
30. Dispute Resolution
30.1 In the event of a dispute as to the construction or interpretation of this Contract, or any rights
or obligations hereunder, the Parties shall first attempt, in good faith, to resolve the dispute
by mediation. The Parties shall mutually select a mediator to facilitate the resolution of the
dispute. If the Parties are unable to agree on a mediator, the mediation shall be conducted
in accordance with the Commercial Mediation Rules of the American Arbitration Agreement,
through the alternate dispute resolution procedures of Judicial Arbitration through Mediation
Services of Orange County ("JAMS"), or any similar organization or entity conducting an
alternate dispute resolution process.
30.2 In the event the Parties are unable to timely resolve the dispute through mediation, the
issues in dispute shall be submitted to arbitration pursuant to California Code of Civil
Procedure, Part 3, Title 9, Sections 1280 et seq. For such purpose, an agreed arbitrator
shall be selected, or in the absence of agreement, each party shall select an arbitrator, and
those two (2)arbitrators shall select a third. Discovery may be conducted in connection with
the arbitration proceeding pursuant to California Code of Civil Procedure Section 1283.05.
The arbitrator, or three (3) arbitrators acting as a board, shall take such evidence and make
such investigation as deemed appropriate and shall render a written decision on the matter
in question. The arbitrator shall decide each and every dispute in accordance with the laws
of the State of California. The arbitrator's decision and award shall be subject to review for
errors of fact or law in the Superior Court for the County of Orange, with a right of appeal
from any judgment issued therein.
31. Attorney's Fees If any action at law or inequity or if any proceeding in the form of an
Alternative Dispute Resolution (ADR) is necessary to enforce or interpret the terms of this
Orange County Sanitation District 7 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
Contract, the prevailing party shall be entitled to reasonable attorney's fees, costs and
necessary disbursements in addition to any other relief to which he may be entitled.
32. Survival The provisions of this Contract dealing with Payment, Warranty, Indemnity, and
Forum for Enforcement, shall survive termination or expiration of this Contract.
33. Severability If any section, subsection, or provision of this Contract, or any agreement or
instrument contemplated hereby, or the application of such section, subsection, or provision
is held invalid, the remainder of this Contract or instrument in the application of such section,
subsection or provision to persons or circumstances other than those to which it is held
invalid, shall not be affected thereby, unless the effect of such invalidity shall be to
substantially frustrate the expectations of the Parties.
34. Damage to OCSD's Property Any of OCSD's property damaged by Contractor, any
subcontractors or by the personnel of either will be subject to repair or replacement by
Contractor at no cost to OCSD.
35. Disclosure Contractor agrees not to disclose, to any third party, data or information
generated from this project without the prior written consent from OCSD.
36. Independent Contractor The legal relationship between the parties hereto is that of an
independent contractor, and nothing herein shall be deemed to make Contractor an OCSD
employee. During the performance of this Contract, Contractor and its officers, employees,
and agents shall act in an independent capacity and shall not act as OCSD's officers,
employees, or agents. Contractor and its officers, employees, and agents shall obtain no
rights to any benefits which accrue to OCSD's employees.
37. Limitations upon Subcontracting and Assignment Contractor shall not delegate any
duties nor assign any rights under this Contract without the prior written consent of OCSD.
Any such attempted delegation or assignment shall be void.
38. Third Party Rights Nothing in this Contract shall be construed to give any rights or benefits
to anyone other than OCSD and Contractor.
39. Non-Liability of OCSD Officers and Employees No officer or employee of OCSD shall
be personally liable to Contractor, or any successor-in-interest, in the event of any default
or breach by OCSD or for any amount which may become due to Contractor or to its
successor, or for breach of any obligation for the terms of this Contract.
40. Read and Understood By signing this Contract, Contractor represents that he has read
and understood the terms and conditions of the Contract.
41. Authority to Execute The persons executing this Contract on behalf of the Parties warrant
that they are duly authorized to execute this Contract and that by executing this Contract,
the Parties are formally bound.
42. Entire Contract This Contract constitutes the entire agreement of the Parties and
supersedes all prior written or oral and all contemporaneous oral agreements,
understandings, and negotiations between the Parties with respect to the subject matter
hereof.
Orange County Sanitation District 8 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
43. Notices All notices under this Contract must be in writing. Written notice shall be delivered
by personal service or sent by registered or certified mail, postage prepaid, return receipt
requested, or by any other overnight delivery service which delivers to the noticed
destination and provides proof of delivery to the sender. Rejection or other refusal to accept
or the inability to deliver because of changed address for which no notice was given as
provided hereunder shall be deemed to be receipt of the notice, demand or request sent.
All notices shall be effective when first received at the following addresses:
OCSD: Darius Ghazi
Senior Buyer
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708
Contractor: Dave Dunavant
Estimator
Hampton Tedder Technical Services
4571 State Street
Montclair, CA 91763
Each party shall provide the other party written notice of any change in address as soon as
practicable.
IN WITNESS WHEREOF, intending to be legally bound, the Parties hereto have caused this
Contract to be signed by the duly authorized representatives.
ORANGE COUNTY SANITATION DISTRICT
Dated: By:
David John Shawver
Board Chairman
Dated: By:
Kelly A. Lore
Clerk of the Board
Dated: By:
Ruth Zintzun
Purchasing & Contracts Manager
COMPANY
Dated: By:
Print Name and Title of Officer
IRS Employer's I.D. Number
Orange County Sanitation District 9 of 9 Specification No. S-2019-1006BD-R (Rebid)
Version 120518
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
OPERATIONS COMMITTEE (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-610 Agenda Date: 9/25/2019 Agenda Item No: 11.
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Assistant General Manager
SUBJECT:
BLANKET PURCHASE ORDER FOR ARC FLASH SUIT & GLOVE RENTAL PROGRAM FROM
CINTAS CORPORATION
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Approve Blanket Purchase Order with Cintas Corporation for 12 calorie per square centimeter
rated daily wear uniform and 65 calorie per square centimeter rated Arc Flash Suit and
Electrically Insulated Glove Lease Program per Cooperative Agreement Contract: R-BB-
19002, for a total amount not to exceed $380,185 for a three-year contract term, plus one
additional three-year renewal option; and
B. Approve contingency of$19,000 (5%).
BACKGROUND
The Orange County Sanitation District's (Sanitation District) maintenance staff are required by
Occupational Safety and Health Administration (OSHA) per National Fire Protection Association
(NFPA) 70E standards to wear appropriately rated personal protective equipment (PPE). Arc flash
suits and electrically insulated gloves are used by electrical, instrumentation, and HVAC maintenance
staff to perform daily tasks with electrical exposure.
All 65 calorie per square centimeter (cal/cm2) rated arc flash suits worn by electrical, instrumentation,
and HVAC maintenance are currently laundered at a local dry cleaning establishment through a
blanket purchase order. Risk Management has determined that this type of PPE should be
laundered at an industrial facility in order to avoid cross-contamination with local dry cleaning to
maintain flame-resistant properties.
RELEVANT STANDARDS
• Commitment to safety & reducing risk in all operations
• Provide a safe and collegial workplace
• Participate in local, state, and national cooperative purchasing programs
PROBLEM
Orange County Sanitation District Page 1 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-610 Agenda Date: 9/25/2019 Agenda Item No: 11.
Due to the nature of the work being performed by electrical, instrumentation, and HVAC maintenance
staff, and frequency of use, PPE will need to continue to be laundered or repaired/replaced on a
reoccurring frequency. Local dry cleaners have been deemed a risk for cross-contamination or
improper care of garments with flame-resistant material. Additionally, local dry cleaner use requires
staff to deliver and coordinate pick-up of garments.
PROPOSED SOLUTION
Staff recommends entering into a blanket purchase order with Cintas Corporation (Cintas) for the arc
flash uniform daily wear, 65 cal/cm2 suit and electrical insulated glove rental program. This program
would launder, inspect, and/or replace the garments; meet compliance with NFPA 70E and ANSI 107
standards; eliminate the risk of cross-contamination at local dry cleaning establishments; and reduce
staff time away from maintenance work. Electrically insulated gloves require regular testing and
associated recordkeeping which is provided by the vendor.
Comparatively, replacement of PPE garments, at the frequency of use, would not be as cost
effective.
TIMING CONCERNS
N/A
RAMIFICATIONS OF NOT TAKING ACTION
Continuing current practices creates potential liability due to the risk of possible cross-contamination
at local dry cleaning businesses and improper care of flame-resistant material.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
OMNIA Partners is the largest purchasing organization for the public sector. It is compromised of the
two leading cooperative purchasing organizations: U.S. Communities and National IPA. The
collective buying power of these two cooperatives deliver best value and large cost savings for public
agencies nationwide. Contracts through this organization have all been competitively solicitated
through the Request for Proposal (RFP) process, evaluated for best value using best industry
practices, and publicly awarded by a government entity acting as the lead agency. The Cintas
Contract, Number R-1313-19002, was initially awarded via U.S. Communities with Prince William
County Public Schools, VA as the lead agency.
CEQA
N/A
FINANCIAL CONSIDERATIONS
Orange County Sanitation District Page 2 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-610 Agenda Date: 9/25/2019 Agenda Item No: 11.
This request complies with authority levels of the Sanitation District's Purchasing Ordinance. This
recommendation would be funded under the Repairs and Maintenance line item for Operations and
Maintenance Department (Budget Update Fiscal Year 2019-20, Page 47), and the available funding
is sufficient for this action.
Date of Approval Contract Amount Contingency
09/04/2019 $380,185 $19,000 (5%)
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda
package:
N/A
RM:ab:gc
Orange County Sanitation District Page 3 of 3 Printed on 9/19/2019
powered by LegistarT"
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
ADMINISTRATION COMMITTEE (714)5937433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-613 Agenda Date: 9/25/2019 Agenda Item No: 12.
FROM: James D. Herberg, General Manager
Originator: Celia Chandler, Director of Human Resources
SUBJECT:
2019 ORANGE COUNTY REGIONAL WATER AND WASTEWATER HAZARD MITIGATION PLAN
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Adopt Resolution No. OCSD 19-17 entitled, "A Resolution of the Board of Directors of the Orange
County Sanitation District Approving and Adopting the 2019 Orange County Regional Water and
Wastewater Hazard Mitigation Plan," in accordance with the Disaster Mitigation Act (DMA) of 2000.
BACKGROUND
The Disaster Mitigation Act (DMA) of 2000 requires all cities, counties, and special districts to
develop and adopt local Hazard Mitigation Plans (HMP) to be eligible to receive federal grants
pertaining to disaster preparedness. The 2019 Orange County Regional Water and Wastewater
Hazard Mitigation Plan (Plan) was recently updated by the Orange County Sanitation District
(Sanitation District), in collaboration with 19 other Orange County water and wastewater agencies.
The purpose of the Plan is to recognize vulnerabilities from manmade and natural disasters within the
Sanitation District's service area that pose a threat to critical infrastructure and identifies mitigation
strategies that will reduce risk and increase infrastructure resiliency. Annex C of the 2019 Plan
provides additional information specific to the Sanitation District with a focus on the risk assessment
and mitigation strategy.
The Plan is being presented for review and approval to each participating utilities' governing boards,
the California Emergency Management Agency, and the Federal Emergency Management Agency
(FEMA). The 2019 Plan builds on the original 2007 Plan and a previous update approved by FEMA
in 2012.
RELEVANT STANDARDS
• Protect Orange County Sanitation District assets
• Maintain collaborative and cooperative relationships with regulators, stakeholders, and
neighboring communities
• Commitment to safety & reducing risk in all operations
Orange County Sanitation District Page 1 of 2 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-613 Agenda Date: 9/25/2019 Agenda Item No: 12.
PROBLEM
The DMA of 2000 requires all cities, counties, and special districts to develop and adopt local HMPs
to be eligible to receive federal grants through the Robert T. Stafford Disaster Relief and Emergency
Assistance Act pertaining to disaster mitigation.
PROPOSED SOLUTION
Sanitation District staff recommends adopting Resolution No. OCSD 19-17 to ensure continued
eligibility for federal grant funding for disaster preparedness.
TIMING CONCERNS
Staff recommends adoption and approval of the updated 2019 HMP Plan and associated resolution
by September 25, 2019 to be eligible to receive federal grant funding.
RAMIFICATIONS OF NOT TAKING ACTION
Without approval, the Sanitation District will not be eligible to receive federal grant funding and will
not be in compliance with the DMA of 2000.
PRIOR COMMITTEE/BOARD ACTIONS
February 2012 - The Board of Directors approved the updated 2007 Orange County Regional Water
and Wastewater Multi-Hazard Mitigation Plan.
December 2006 - The Board of Directors adopted the Orange County Regional Water and
Wastewater Multi-Hazard Mitigation Plan subject to incorporation of comments, if any by the State
Office of Emergency Services and the Federal Emergency Management Agency upon completion of
their review.
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package.-
Annex C of the 2019 Orange County Regional Water and Wastewater Hazard Mitigation Plan
• Resolution No. OCSD 19-17
• Resolution Exhibit "A" 2019 Orange County Regional Water and Wastewater Hazard
Mitigation Plan (Online Only)
Orange County Sanitation District Page 2 of 2 Printed on 9/19/2019
powered by LegistarTM
ANNEX C Orange County sanitation District
ORANGE COUNTY SANITATION DISTRICT ANNEX
The Orange County Sanitation District (OCSD) is a participant (Member Agency [MA]) in the Orange
County Water and Wastewater Multi-Jurisdictional Hazard Mitigation Plan(HMP or Plan). As a participant
MA, OCSD representatives were part of the HMP Planning Process and served on the Planning Team
responsible for the Plan Update; refer to Section 2 of the Plan. The primary Plan, including the hazard
mitigation plan procedural requirements and planning process apply to OCSD.
This Annex supplements information contained in the primary Plan and describes how OCSD's risks vary
from the planning area. The Risk Assessment (Section 3) summarizes the hazards and risks that pose a
threat to Orange County. The primary Plan treats the entire County as the planning area and identifies
which MAs are subject to a profiled hazard. The purpose of this Annex is to provide additional information
specific to OCSD with a focus on the risk assessment and mitigation strategy.
HAZARD MITIGATION PLAN POINT OF CONTACT AND DEVELOPMENT TEAM
The following representatives attended the Planning Team meetings on behalf of OCSD and coordinated
the hazard mitigation planning efforts with OCSD staff:
Primary Point of Contact Alternate Point of Contact
Rod Collins Derek Harp
Safety and Health Supervisor Security and Emergency Planning
rcollins@ocsd.com dharp@ocsd.com
714-573-7832 714-593-7192
In addition to participating on the Planning Team, an internal team was also formed to support Planning
Team representatives and provide information for the Plan update. The following staff served as OCSD's
internal hazard mitigation planning development team.
Representative Title How Participated
Richard Spencer Human Resources/Risk Manager Project Manager
George Rivera Security/Emergency Planning Specialist Data Collection
JURISDICTION PROFILE (Service Population: 2.5 million)
OCSD is responsible for safely collecting,treating,and disposing wastewater(sewage)and industrial waste
in central and northwest Orange County. Owning 396 miles of wastewater pipeline, OCSD serves 2.6
million residents in 20 cities, four special districts and the unincorporated areas within north and central
Orange County. The District is governed by a board of 25 individuals; 24 board members are elected
officials appointed by the cities and special districts served, and one is a representative from the Orange
County Board of Supervisors.
OCSD treats approximately 185 million gallons of wastewater each day at either Plant No. 1 in Fountain
Valley or Plant No. 2 in Huntington Beach and releases it into the ocean five miles from shore and
approximately 200 feet below the surface. The one-mile-long diffuser section on the five-mile ocean outfall
contains 503 portholes through which treated wastewater are slowly released. Up to 70 million gallons of
treated wastewater is reclaimed each day for use by the OCWD to supplement the recharge of the
groundwater basin, landscape irrigation, and injection into the sweater intrusion barrier along the coast.
Final I August 2019 C-1
ANNEX C Orange County sanitation District
In addition to its primary role of managing wastewater for north and central Orange County, OCSD is also
concerned about ocean water quality and protecting the coastline from urban runoff contamination.
Therefore, OCSD's charter was modified to allow OCSD to accept dry weather urban runoff contaminated
with bacteria in the sewer system. The dry weather urban runoff is then treated with the raw sewerage
entering the plants and disinfected before it is released to the ocean outfall system. Currently, OCSD
recycles all biosolids produced for beneficial use by the agricultural industry and runs an award-winning
ocean monitoring program that evaluates water quality, sediment quality and sea life.
HAZARDS
Detailed hazard profiles for the planning area are provided in Section 3. OCSD's service area includes
most of central and northwest Orange County. Compared to southern Orange County, it has less area
susceptible to wildfire but more area susceptible to flooding, extreme ground shaking, and liquefaction.
There are no hazards that are unique to OCSD.
Based on the risk assessment, the OCSD development team identified the following hazards that affect
OCSD and summarized their geographic extent, probability of future occurrence, magnitude/severity and
significance; refer to Table C-1.
Final I August 2019 C-G
ANNEX C Orange County sanitation District
Table C-1
OCSD Hazard Identification
Geographic Probability of
Hazard Extent Future Magnitude/Severity Significance
Occurrences
Climate Change Limited Unlikely Negligible Low
Coastal Storms/Erosion Limited Likely Limited Low
Tsunami Limited Likely Limited Low
Contamination/Salt Water Intrusion Significant Unlikely Limited Medium
Dam/Reservoir Failure N/A N/A N/A N/A
Drought Limited Unlikely Negligible Low
Earthquake Fault Rupture& Extensive Highly Likely Catastrophic High
Seismic Hazards
Flood Significant Likely Limited Medium
Geologic Hazards Significant Occasional Limited Medium
High Winds/Santa Ana Winds Limited Unlikely Limited Low
Landslide/Mudflow Significant Occasional Limited Low
Wildland/Urban Fire Significant Likely Critical Medium
Human-Caused Hazards Significant Occasional Critical Medium
Power Outage Extensive Highly Likely Catastrophic High
Geographic Extent Magnitude/Severity
Limited: Less than 10%of planning area Catastrophic—More than 50 percent of property severely damaged;
Significant: 10-50%of planning area shutdown of facilities for more than 30 days;and/or multiple deaths.
Extensive: 50-100%of planning area Critical-25-50 percent of property severely damaged;shutdown of
facilities for at least two weeks;and/or injuries and/or illnesses result
Probability of Future Occurrences in permanent disability.
Highly Likely: Near 100%chance of occurrence in next year,or Limited-10-25 percent of property severely damaged;shutdown of
happens every year. facilities for more than a week;and/or injuries/illnesses treatable do
Likely: Between 10 and 100%chance of occurrence in next not result in permanent disability.
year,or has a recurrence interval of 10 years or less. Negligible—Less than 10 percent of property severely damaged,
Occasional: Between 1 and 10%chance of occurrence in the shutdown of facilities and services for less than 24 hours;and/or
next year,or has a recurrence interval of 11 to 100 years. injuries/illnesses treatable with first aid.
Unlikely: Less than 1%chance of occurrence in next 100
years,or has a recurrence interval of greater than every 100 Significance
years. Low: Minimal potential impact
Medium: Moderate potential impact
High: Widespread potential impact
The identification of hazards provided in Table C-1 is highly dependent on the location of facilities within
each agencies jurisdiction and takes into consideration the history of the hazard and associated damage (if
any),information provided by agencies specializing in a specific hazard(e.g.,FEMA,California Geological
Survey), and relies upon each agencies' expertise and knowledge.
Hazard Maps
The following maps show the location of hazard zones within the jurisdiction relative to wastewater
systems, as applicable.
Final I August 2019 C-3
ANNEX C Orange County sanitation District
Figure 1
Fire Hazard and OCSD Wastewater Infrastructure
T D -
-
A
WATER CO OC- e�
LA PALMAr PP4`RN..-
\i it
\\\\A HE III 1
RBS H'
SE
E
Ar H1 of F"
— �Er
GROVE-_^ EAST ORA
6AN TAR COUNTY
_ STRICTDIST
SANITARY BOUHUnu
-.RE Cf W CIT L 1
06TRICTT ■ I y/
F.
RANTA
A J
RANCH
BEACH
N
BEE
NI�ARlAB 55iR
+J
t, f
EA mrR11 T
N BCHT DI9T^R/\]IC��
Fire Hazard ~
MDNLTON Zones T
IS 1B
DISTRICT r MOderale
Hlgh
M Very High
ORANGE COUNTY SANITATION DISTRICT
WASTEWATERINFRASTRUCTURE
Gravity Mains ■ WaalewalerT M1t P1a t
10"and greater ■ Dive so-an �_.
Facility ---FMall¢
■ TREATMENTPLANTS -OUMII LInoS 1
�10-W20 -R�,o Sewer Lines
Freeways
weak,cn,nnel .A}�C�. IL
�51' .antl Groalar lekeNrRaservora
O OGSO Boundary Janw 2017i I
Final August 2019 C-
ANNEX C Orange County sanitation District
Figure 2
Flood Hazard and OCSD Wastewater Infrastructure
-L--1,
se,JERRaoulaolnav
1,7 ENSui
LA
+'. r
I® DIVRIC
STO
1 � n �
ryry
TER pIST C -
f -3 9rrc— DA
I' I _. INE KMDN
y 9i-6rsmlcr k
ITD
each
TRABNOC CANYON
WATER DISTRICT
4 /
— Ck 6u EL ATE
N SEFCENT • 3. o„.. ` DISTRICT
MDDLTDN Flood Hazard T
WAER
DISTRICT Zones
FEMA 1 OD Y6ar
uNreN oIs_ FEMA 500 Year
ORANGE COUNTY SANITATION DISTRICT
WASTEWATERINFRASTRUCTURE
Gravity Mains ■ MMSI alerT M1t RIa t
10"and greater ■ Dive so-an
Facility ---FMaim
■ TREATMENTPLANTS —OUMII Llnoe T
�10'b20 —R�,o Sewer LIMB
Freeways
OkW Dlln 61.' lky/
�S1'antl aINsSr
lakeArRas e—rvora .�.,..„......��u....a.m, `l
O OOSD BoanCary Janw 2017i
Final August 2019 r-5
ANNEX C Orange Connty sanitation District
Figure 3
Fault Rupture Hazard and OCSD Wastewater Infrastructure
EA HABRA
B„EA
FGLLEnTON
G TATE
_ —ER NDAaY
WATER CO OC—
Fr
LA PALNA BUENA �
— PA4RIN _ - ✓V
\ ANA M
_ I (t ftOSTRIC r
—_ GROVE^ EP COUNTY
B sTNICT t COUNTY
_ ._. - � �. wdreR Wsr
� � -s ITAJnapue0.
EEALBE CH 7Y�IrT
TRIFT
SAN-
ELE
RAN�N
HUNTINGTON r
BE -— \ u 1RdeUCO CANYON
_CH
...�' WATLR gaTYO
GOTTA META
nlTnRvosTR
w --
EL T R0
+ BEhC wE DISTRICT
—TA
MAR ITA
---- Earthquake r
�J Hazard
LG T—Ae
Alquist-Prido Rupture Zones
ORANGE COUNTY SANITATION DISTRICT
WASTEWATERINFRASTRUCTURE
Gravity Ma ins ■ Waslewnre—nneMPINn1
10"and greater ■ oiv—so-sC—
Facility —---Faca Mans \
■ TREATMENTPLANT9 OullNll Linos T
—10'b20' —R,OnM Seu'e,Lines
Fr---ys J
weak cn,nnel IL
�51'antlGroalar LakedlReservora
OOOSD Boundary IJan.q,201 Ti �.v,.-...._.....................:...�...a.,mr....,....... '`
Final August 2019 C-V
ANNEX C Orange County sanitation District
Figure 4
Ground Shaking Hazard and OCSD Wastewater Infrastructure
MIA
oRANDE
to EN y �' I < my
e STRICT T '/'
�... _ � R OIINTe�
s INTA A
AN.
IRVINE NANDN'
" y vvATER DISTR17
YONIEIIA
����
It
NITanv oisA
. WAORO III;NEwPoRT ® .� e DISTRICIC
T
Ground Shaking
j `
MN� Susceptibility T
T Moderate
High
`"'� D4C �Extreme
ORANGE COUNTY SANITATION DISTRICT
WASTEWATERINFRASTRUCTURE
Gravity Maine ■ vuaslev�alerTrmtmem clam
4 and greater ■ Diverwn strunvee
Facility ---Forco Malr¢
■ ATMENTPLANTN -0N 1Ll T
-li�ionel Serer Lines �I /
�I0'b20' Freeraya
weak,cn,nr»I IL
�51'antlGroaler takRarRaservora `J
O OOSD Boundary(Janu 2017)
Final I August 2019 r-
ANNEX C Orange County sanitation District
Figure 5
Liquefaction Hazard and OCSD Wastewater Infrastructure
s / ,
Ir + 5 VrE BCIINDtV I1T
E -
f 1
n� �/ ArvAXE�r f T
EEl
0.OIS RIG` z r
ATEa�ar
_ B aeTSANIT
3
--
_ ms 17D
t
xA„RcD X warENDs
�/ xvlxE i
.n�EncnGry II r-i < '.f�`r
osTak,ESA - ,-
R r f
NeucXr �. G-RIcr
�� Liquefaction
aDDLDN Susceptibility
NIGUEL -Very High _
/ DSTRIC? High
LU GUNA cX UnknOWn
ORANGE COUNTY SANITATION DISTRICT
WASTEWATERINFRASTRUCTURE
Gravity Maine ■ vuaslew�erTrmlmem clam
10"and greater ■ Dmerwn svunvee l
FacilityMENT ---Face lU—
■ ATPLANT9 —Ouxall Llnoe 1
R,,ionel Serer Lines .� /
Freeraye
�51'antl Groaler Greek.Cka e— wr_....ua„..w.,..eeiu �.•"`.•"'•.""•"",••••
lakearRasrvora ...................�.............,..... .....,,�- `�r
O OOSD Boundary Janwry 2017i
Final August 2019 C-O
ANNEX C Orange Connty sanitation District
Figure 6
Landslide Hazard and OCSD Wastewater Infrastructure
8 NSTATE '
=wERR���oIAT
_ 'WATER COOC
`rZ
\A
- — _ ABOEN
�C .. r_ ROVE RAN •y ..
✓
S N TAR i COUNTY
sTRICr wA.ER DIET, �:-' �
An < e
d r
E«BEACH NY PITY
SANTA
T
LLE � a[ 4•
A
- warERD ST 1s ..
H TINOTON
BEACH - /
- �i�CO CANYON
R D SiR Cr
t `
u I
N OiARAD sSa Ml� i
J:y
EwLa°Ea°
N9EACHr y _ DISTRICT
SANTA
MOULiON ��
t
WIL ATER"` - Landslide
D19TR1CT Susceptibility
LAGUNA BEACH
colH,ry wATEa DIsr---.�,� �� 30 Landslide Hazard
ORANGE COUNTY SANITATION DISTRICT -
WASTEWATERINFRASTRUCTURE
Gravity Maine ■ vuaslewalerTrmlmem Planl
10"and greater ■ Dlverwn svunvee - - �..
Facility ---Fo,co Ma11¢
■ TREATMENTPLANTS —ONIa11 I-— T
isnM Sewer Linea
Freeways
weak,cn,nnel IL
�51'antl Groalar izkealRas.—In
OOOSDeou d_(Janw 201]) •ev:ue�%-....v,..........m. «.�:.....................::..........
Final August 2019 C-9
ANNEX C Orange Connty sanitation District
Figure 7
Tsunami Hazard and OCSD Wastewater Infrastructure
B„Ea
FGLLEnTON °Eeo=1R
G .ATE
_ s-ER
NDAaY
WATER CO OC-
LA PALMA BUENA
— RMrk _ - ✓V
\ ANA M
- \
SERReNG
ftnbiRlC r
GROVE-_^ EPST ORAx
6 siRlCr t COUNTY
-TER MST
s ITAJwapLSNueD.
EALBE C 74 ITT r
■STRIPY
ANA
WATER U.N'
ICT 'q
lEl
in
t
cas J
EL TO �(
DISTRICT
l/—'` - MASANTA
RGARITA
j w'p Tsunami Hazard
Zones
uxruuw euco �- Tsunami Hazard
ORANGE COUNTY SANITATION DISTRICT
WASTEWATERINFRASTRUCTURE
Gravity Ma ins ■ vuaslevTalerrrmlmem Plznl
10"and greater ■ Diverwn svunvee - - �..
Facility ---Face Mall¢
■ T ATMENTPLANTS —ODUMI Lm t:
l0'm20'
FreevayS ,,,
r m'0' weak.cnennel ""
51'antl Groaler
LakealRaservoka
O OOSD Boundary lJan.q,201 Ti •01vi
Final August 2019 C-10
ANNEX C Orange County sanitation District
VULNERABILITY AND RISK ASSESSMENT
Assets Susceptible to Hazard Events
Table C-2, OCSD Infrastructure and Exposure to Hazards, identifies OCSD's wastewater infrastructure
assets that are located within the mapped hazard zones,identified above.
Table C-2
OCSD Infrastructure and Exposure to Hazards
Infrastructure
Z7% Wastewater Diversion Treatment
Pipeline(miles) Lift Stations Structures Plants
Moderate 8.7 4 2 0
Fire Hazard Zone High 10.2 0 0 0
Very High 5.2 3 0 0
100-Year 41.8 1 39 2
FEMA Flood Zone
500-Year 129.7 9 6 0
Alquist-Priolo Rupture Zone 0.7 0 0 0
Moderate 0.01 0 0 0
Ground Shaking High 230.9 11 45 4
Extreme 177.2 8 29 0
Moderate 99.7 0 22 0
Liquefaction High 186.2 0 31 2
Very High 15.9 0 1 1
Unknown 29.6 0 4 0
Landslide Zone 1.0 2 5 0
Tsunami Zone 5.0 3 0 1
Several miles of the district's pipeline system along with two treatment plants are located within areas
identified as susceptible to flooding. Lift stations are also located within areas mapped as very fire hazard
zone. Similarly,several miles and facilities,including lift stations,diversion structures and treatment plants
are located within areas identified as having a high or extreme risk of ground shaking and a moderate,high,
and very high risk of liquefaction during an earthquake. In addition,a pipeline in Huntington Beach crosses
a mapped fault zone three times and lift stations and a treatment plant are located within a tsunami zone.
CAPABILITIES ASSESSMENT
The capabilities assessment is designed to identify existing local agencies,personnel,planning tools,public
policy and programs,technology, and funds that have the capability to support hazard mitigation activities
and strategies outlined in this Plan. The OCSD internal development team revised the capabilities identified
in the 2012 plan and collaborated to identify current local capabilities and mechanisms available to the MA
for reducing damage from future hazard events. Tables C-3a through C-3d assess the authorities,policies,
programs,and resources that the authority has in place that are available to help with the long-term reduction
Final I August 2019 C-1 t
ANNEX C Orange County sanitation District
of risk through mitigation. These capabilities include planning and regulatory tools, administrative and
technical resources, financial resources, and education and outreach programs. The agency has the ability
to create or expand existing policies and programs to implement mitigation programs
Table C-3a
Planning and Regulatory Capabilities Summary
Ordinance,Plan,Policy, Responsible Agency or Department Description/Comments
Program
Building Code City/County OCSD complies with applicable building codes and works with the cities
within the District service area.
Zoning Ordinance City/County OCSD complies with applicable zoning ordinances and works with cities
within the District service area.
Subdivision Ordinance or City/County OCSD complies with applicable subdivision ordinances or regulations,
Regulations and works with cities within the District service area.
Special Purpose Ordinance City/County OCSD complies with applicable special purpose ordinances,and works
with cities within the District service area.
Growth Management City/County OCSD complies with applicable growth management ordinances, and
Ordinances works with cities within the District service area.
Site Plan Review City/County OCSD complies with applicable site plan review requirements,and works
Requirements with cities within the District service area.
General Plan City/County OCSD complies with applicable General Plan requirements,and works
with cities within the District service area.
Capital Improvements Plan Finance Department OCSD maintains a capital improvement plan
Economic Development Plan City/County OCSD complies with applicable economic development plans,and works
with cities within the District service area.
Integrated Emergency The IERP is designed to address organized response to emergency
Response Plan Risk Communications Division;OCSD situations associated with natural or manmade incidents.
Post-Disaster Recovery Plan Risk Communications Division;OCSD This is a component of the IERP.
Emergency Public Notification Public Affairs;OCSD OCSD has identified personnel who carry out responsibilities of public
information.
Emergency Communications Risk Management;OCSD OCSD has the capability to communicate with WEROC and the Orange
County OA.
Emergency Operations Center Risk Management;OCSD OCSD has a 24-hour operational capability of the EOC staffing,feeding,
fuel,for generators.
Damage Assessment Teams Risk Management;OCSD DAT will conduct preliminary damage assessments to structures,critical
facilities,and infrastructure.
HR supports the district in a variety of administrative functions including
Human Resources Human Resources Department;OCSD employee training and identification of new staff positions. Hazard
mitigation activities are the responsibility of this department.
How can these capabilities be expanded and improved to reduce risk?
Conduct disaster response fuel analysis and contingency planning with WEROC as a component of the CA Southern California Catastrophic Plan.
Evaluate ability to contract with local fuel distributors and gas stations for emergency backup supply.
The OCSD Continuity of Operations Plan(COOP)is designed to address and ensure integrated wastewater continuity and emergency response within
the service area.Identify whether aspects of the HMP should be incorporated into the COOP.
OCSD works with WEROC and other partner agencies in the integration of existing capabilities and shared resources to achieve common planning
goals and initiatives.
Work with the OCSD Public Affairs office to use district social media to inform residents of special events,emergency information and news.
Final I August 2019 C-12
ANNEX C Orange County sanitation District
Table C-3b
Administrative and Technical Capabilities Summary
StafflPersonnel or Type of Resource Responsible Agency or Department Description/Comments
Planner(s) Engineer(s)with Knowledge of Outside consultants in coordination with the OCSD staff utilizes an outside consultant with
Land Development and Land Management OCSD input from staff.
Practices
Engineer(s)or Professional(s)Trained in Licensed Civil Engineers and certified building
Construction Practices Related to Buildings Engineering Department;OCSD evaluators (Safety Assessment Program
and/or Infrastructure certified by Cal OES).
Planners or Engineer(s)with an Understanding Engineering Department;OCSD Regional General Plan(RGP).
of Natural and/or Human-Caused Hazards
Floodplain manager County of Orange Floodplain Manager Adhere to county standards.
Surveyors Outside consultant in coordination with OCSD City staff utilizes an outside consultant with input
from staff.
Staff with Education or Expertise to Assess the Emergency Management Department, OCSD has an emergency coordinator and
Community's Vulnerability to Hazards WEROC,County of Orange,OCIAC coordinates with WEROC and the County to
assess vulnerabilities.
Personnel Skilled in GIS and/or HAZUS Outside consultant in coordination with OCSD City staff utilizes an outside consultant with input
from staff.
Scientists Familiar with the Hazards of the Emergency Management Department, The district coordinates with WEROC, the
Community WEROC,County of Orange County, and the cities in our service area to
identify hazards.
Emergency Manager Director of Operations,Risk Management OCSD employs a full time emergency manager.
Grant Writers Outside consultant in coordination with OCSD City staff utilizes an outside consultant with input
from staff.
How can these capabilities be expanded and improved to reduce risk?
Evaluate participation in MWDOC Water Loss Control Program,including meter testing and leak detection through training of internal staff or through
MWDOC's Choice program.
Have all agency registered engineers and other qualified individuals attend CalOES Safety Assessment Program(SAP)training for building
inspections.
Continue to work with the OCSD Public Affairs Office on opportunities to communicate hazard mitigation and emergency planning information to the
public and partner agencies.
Identify how in house environmental capabilities(performance of sampling,monitoring,analysis and recommendations for collection system,treatment
process and marine sediments)can be integrated into hazard mitigation planning.
Table C-3c
Financial Capabilities Summary
Financial Resources Agency or Department Description/Comments
Community Development Block Finance Department;OCSD Prepared,submitted,and received funding for various construction
Grants(CDBG) projects. Includes but not limited to State Revolving Fund Loan.
Capital Improvements Project Finance Department;OCSD The district contributes funds to the capital improvement project fund on
Funding a yearly basis.
Fees for Water,Sewer,Gas,or Finance Department;OCSD Charge producers for recycled and ground water.
Electric Service
Incur Debt Through General Finance Department;OCSD Use revenue refunding bonds to refinance existing debt.
Obligation Bonds
Grants Finance Department;OCSD The district actively applies for federal and state grants.
How can these capabilities be expanded and improved to reduce risk?
Learn about how to utilize post disaster mitigation grants(Section 406)and incorporate it into the utility's disaster recovery strategy.
Table C-3d
Final I August 2019 C-13
ANNEX C Orange County sanitation District
Education and Outreach Capability Summary
Resourceivrogra Agency or Department MM Description/Comments
Agency website Public Affairs;OCSD The district informs residents of special events,emergency information,
and news.
Twitter Public Affairs;OCSD The district informs residents of special events,emergency information,
and news.
Memorandums Public Affairs;OCSD The district informs residents of special events,emergency information,
and news.
How can these capabilities be expanded and improved to reduce risk?
Participate in WEROC lead efforts to develop standardized messaging for water outages,dam events and general disaster response.Ensure that
messaging will work for the general community,as well as the Access,Disability,and Functional Needs community specific to our utility.
MITIGATION STRATEGY
Mitigation Goals
OCSD adopts the hazard mitigation goals developed by the Planning Team; refer to Section 4.
Mitigation Actions
The internal development team reviewed the mitigation actions identified in the 2012 plan and the updated
risk assessment to determine if the mitigation actions were completed, require modification, should be
removed because they are no longer relevant, and/or should remain in the Plan Update. New mitigation
actions to address the updated risk assessment and capabilities identified above were also considered and
added. Table C-4,OCD Mitigation Actions,identifies the mitigation actions,including the priority,hazard
addressed,risk, timeframe, and potential funding sources.
Table C-4
OCSD Mitigation Actions
Priority Risk V Timeframe Status/
(High, Action/Task/Project Location/ (High, Cost Responsible (Immediate, Funding (New,Possible Progress Status
Medium, Description Facility Medium,or Short Term, Rationale
Sources Existing,
or Low) Low) or Long Term) Modified)
Secure above-
ground assets in all
buildings,water Evaluating
Being Engineering/ nonstructural
Low reclamation plants, District Wide High evaluated Operations Long Budget Existing components.
lift stations,pipelines Earthquake
and bridge
crossings.
Perform a seismic
high study analysis for all District Wide High 1 Million Engineering Immediate Budget Existing Earthquake
structures and
facilities.
Final I August 2019 C-1
ANNEX C Orange County sanitation District
Table C-4 [continued]
OCSD Mitigation Actions
Priority Risk Timeframe Status/
(High, Action/Task/Project Location) (High, Cost Responsible (Immediate, Funding (New,Possible Progress Status
Medium, Description Facility Medium, Short Term, Rationale
or Low) or Low) or Long Term) Sources Existing,
Modified)
Conduct routine site
inspections of
structures and Corrosion
Medium facilities and follow-up District Wide Medium 500K(Year Operations Long Term Budget Existing Management
on any reported Program.All
structural deficiencies Hazards
or mitigation
measures.
Provide redundant
underground
communication
Low systems for critical District Wide Low N/A Operations Long Term Budget Existing All Hazards
facilities to insure
reliability of operating
systems.
Build redundancy into
the wastewater
collection,treatment,
High disposal and non- District Wide High N/A Engineering/ Long Term Budget Existing All Hazards
potable distribution Operations
system to mitigate
major structural
defects.
Follow the Asset
Management Plan for Capacity,
Medium replacement and District Wide Medium 200 M Engineering Long Term Budget Existing Corrosion,
refurbishment of Level of
facilities. service failures
Protect and reinforce
facilities within flood
plain areas,rivers and
creeks or relocate Engineering/
Medium facilities out of harm's District Wide Low N/A Operations Long Term Budget Existing Flood
way(includes
protection and/or
relocation of SARI
line).
Install joint less
Low cross gsipenes in all creek and slope CollectiSystem s Low N/A EngineeringOperations/ Long Term Budget Existing Earthquake
easements.
Identify locations and
install sensors/alarms
High for harmful District Wide Low N/A Operations Short Term Budget Existing Fire
contaminants entering
the treatment system.
Improve security at Upgrade
key facilities and Operations/ CCTV,and
Medium District Wide Medium 100K Short Term Budget Existing lighting.
install surveillance Security Human Cause
equipment. Hazard
Final I August 2019 C-15
ANNEX C Orange County sanitation District
Table C-4 [continued]
OCSD Mitigation Actions
Priority Risk Timeframe Status/
(High, Action/Task/Project Location/ (High, (Immediate, Possible Progress
Medium, Description Facility Medium, Cost Responsible Short Term, Funding (New, Status Rationale
or Low) or Low) or Long Sources Existing,
Term) Modified)
Locations are
Upgrade SCADA currently being
Medium system to existing District Wide High 200K Operations/ContractorShort Term Budget Existing determined.
sites as needed. Human Caused
Hazard.
Yorba Linda
Pumping Station,
Seal Beach
Pumping Station,
Bitter Point Pump
Standardize and Station,Rocky
upgrade older lift Point Pump study is being
c
Medium station electrical and Station,Crystal Low 160M Operations Long Term Budget Existing conducted instrumentation Cove Pumping determine priority.
All hazards
systems. Station,Bay Bridge
Pumping Station,
MacArthur
Pumping Station,
Edinger Pumping
Station
Survey and improve
site fencing and other Conducting a
forms of hardening study to
deterrence to Operations/ determine
Medium facilities including the District Wide Medium 10K Security Short Term Budget Existing prioritization.
use of camera and Human Caused
wireless hazard
communications.
Examine
opportunities for on- Conducting a
line water quality study to
determine
Medium sensing relative to Di potential human strict Wide Low N/A Water Quality Long Term Budget Existing prioritization.
induced Human caused
contamination,and Hazard.
implement if feasible.
Final I August 2019 C-1 G
ANNEX C Orange County sanitation District
Completed or Removed Mitigation Initiatives
The following mitigation actions from the 2012 plan have been completed and therefore are removed from
the Plan update.
Miti ag tom: Strictly enforce standard separation between water and wastewater infrastructure.
Status: Removed,Not applicable.
PLAN INTEGRATION
OCSD's capital budget,Wastewater Master Plan,and the Integrated Emergency Response Plan are all used
to implement mitigation initiatives identified in this annex. After adoption of the HMP, the District will
continue to integrate mitigation priorities into these documents.
Since the previous Plan Update, OCWD incorporated information from the HMP in its CIP, in addition to
the following planning mechanisms:
• Incorporation of mitigation initiatives into the Water Master Plan.
• The risk assessment information was used to update the hazard analysis in OCSD's Emergency
Response Plan.
OCSD will continuously monitor the progress of mitigation actions implemented through these other
planning mechanisms and,where appropriate,their priority actions will be incorporated into updates of this
Plan.
Final I August 2019 C-1
ANNEX C Orange Connty sanitation District
This page intentionally left blank.
Final I August 2019 C-1 O
RESOLUTION NO. OCSD 19-17
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT APPROVING AND
ADOPTING THE 2019 ORANGE COUNTY REGIONAL WATER AND
WASTEWATER HAZARD MITIGATION PLAN
WHEREAS, the United States Congress passed the Disaster Mitigation Act of
2000 emphasizing the need for pre-disaster mitigation of potential hazards; and
WHEREAS, the Disaster Mitigation Act of 2000 requires all cities, counties and
special districts to develop and adopt a Hazard Mitigation Plan (HMP) to be eligible to
receive federal grants pertaining to disaster preparedness; and
WHEREAS, the Orange County Sanitation District ("OCSD") recognizes that the
threat from natural hazards poses a risk to water and wastewater utilities and the
individuals they serve, and impacts can result in regional economic and public health
consequences; and
WHEREAS, by planning for natural and manmade hazards and implementing
projects that mitigate risk, utilities can reduce costly damage and improve the reliability of
service following a disaster; and
WHEREAS, the Municipal Water District of Orange County, OCSD and 18 other
member agencies participated in development of the HMP in conjunction with a
consultant; and
WHEREAS, the resources and information within the HMP will allow OCSD and
the member agencies to identify and prioritize future mitigation projects, meet the
requirements of federal assistance programs and grant applications, and encourage
coordination and collaboration in meeting mitigation goals; and
WHEREAS, a Planning Team was formed to participate in the FEMA-prescribed
mitigation planning process to prepare the HMP; and
WHEREAS, a public outreach strategy was employed as a required component of
developing the HMP, including posting information on member agency websites, email
and social media distribution, community survey, and presentations at the Orange County
Business Council and Orange County Emergency Management Organization meetings;
and
WHEREAS, the HMP was made available for public review from August 10, 2018
to September 10, 2018, and
WHEREAS, on October 15, 2018 the HMP was provided to the California
Department of Emergency Services (CaIOES) for review; and
OCSD 19-17-1
WHEREAS, the HMP was revised based on CalOES feedback and was submitted
to the Federal Emergency Management Agency(FEMA)for review on February 20, 2019;
and
WHEREAS, the HMP received FEMA Approval Pending Adoption on July 16, 2019
subject to the member agencies adopting resolutions approving and adopting the HMP;
and
WHEREAS, the Board of Directors have reviewed the HMP; and
WHEREAS, the HMP identifies and assesses hazards most likely to affect OCSD
and provides actions to mitigate them.
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation
District, DOES HEREBY RESOLVE, DETERMINE, AND ORDER:
That the Orange County Regional Water and Wastewater Hazard Mitigation Plan
attached as Exhibit "A" is hereby approved and adopted by OCSD.
PASSED AND ADOPTED at a regular meeting of the Board of Directors held September
25, 2019.
David John Shawver
Board Chairman
ATTEST:
Kelly A. Lore, MMC
Clerk of the Board
APPROVED AS TO FORM:
Bradley R. Hogin
General Counsel
OCSD 19-17-2
STATE OF CALIFORNIA )
ss
COUNTY OF ORANGE )
I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation
District, do hereby certify that the foregoing Resolution No. OCSD 19-17 was passed and
adopted at a regular meeting of said Board on the 25t" day of September 2019, by the
following vote, to wit:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal
of Orange County Sanitation District this 25t" day of September 2019.
Kelly A. Lore, MMC
Clerk of the Board of Directors
Orange County Sanitation District
OCSD 19-17-3
FINAL
Orange County Regional Water
and Wastewater
Hazard Mitigation Plan
Prepared by:
MUNICIPAL WATER DISTRICT OF ORANGE COUNTY
18700 Ward Street
Fountain Valley, California 92708
Contact: Kelly Hubbard
WEROC Programs Manager
714.593.5010
MICHAEL BAKER INTERNATIONAL
5 Hutton Centre Drive, Suite 500
Santa Ana, California 92707
Contact: Ms. Kristen Bogue
949.855.5747
GPA CONSULTING
2642 Michelle Drive, Suite 110
Tustin, California 92780
Contact: Ms. Starla Barker, AICP
310.792.2690
August 2019
JN 161720
This document is designed for double-sided printing to conserve natural resources.
TABLE OF CONTENTS
Section1.0 Introduction...................................................................................................................................1-1
1.1 Purpose of the Plan and Authority.......................................................................................1-3
1.2 Multi-Jurisdictional Participation...........................................................................................1-5
1.2.1 Overview of Water and Wastewater Systems in Orange County..............................1-5
1.2.2 Participating Jurisdictions..........................................................................................1-6
1.3 What is New/What Has Changed from the 2012 Plan.........................................................1-8
1.4 Plan Organization................................................................................................................1-9
Section 2.0 Planning Process Documentation..............................................................................................2-1
2.1 Organizing Resources.........................................................................................................2-1
2.1.1 Project Management Team.......................................................................................2-2
2.1.2 Planning Team..........................................................................................................2-2
2.1.3 Public Outreach ........................................................................................................2-6
2.1.4 Review and Incorporate Existing Information............................................................2-8
2.2 Assess Risks.......................................................................................................................2-8
2.2.1 Identify/Profile Hazards.............................................................................................2-9
2.2.2 Assess Vulnerabilities...............................................................................................2-9
2.3 Develop Mitigation Plans.....................................................................................................2-9
2.3.1 Identify Goals............................................................................................................2-9
2.3.2 Develop Capabilities Assessment.............................................................................2-9
2.3.3 Identify Mitigation Actions.......................................................................................2-10
2.3.4 Plan Review and Revision ......................................................................................2-10
2.3.5 Plan Adoption and Submittal...................................................................................2-10
2.3.6 Plan Maintenance...................................................................................................2-10
Section3.0 Risk Assessment..........................................................................................................................3-1
3.1 Hazard Identification and Prioritization ................................................................................3-1
3.1.1 Hazard Identification.................................................................................................3-1
3.1.2 Hazard Prioritization..................................................................................................3-4
3.2 Hazard Profiles....................................................................................................................3-6
3.2.1 Climate Change........................................................................................................3-7
3.2.2 Coastal Storms/Erosion ............................................................................................3-9
3.2.3 Contamination/Salt Water Intrusion ........................................................................3-11
3.2.4 Dam/Reservoir Failure............................................................................................3-13
3.2.5 Drought...................................................................................................................3-21
3.2.6 Earthquake Fault Rupture&Seismic Hazards (Ground Shaking & Liquefaction)...3-26
3.2.7 Flood.......................................................................................................................3-40
3.2.8 Geologic Hazards(Expansive Soils&Land Subsidence).......................................3-45
3.2.9 High Winds/Santa Ana Winds.................................................................................3-49
3.2.10 Landslide/Mudflow..................................................................................................3-52
3.2.11 Tsunami..................................................................................................................3-57
3.2.12 Wildland/Urban Fire................................................................................................3-61
3.2.13 Human-Caused Hazards.........................................................................................3-66
3.2.14 Power Outage.........................................................................................................3-71
3.3 Vulnerability Assessment...................................................................................................3-72
3.3.1 Asset Inventory.......................................................................................................3-73
Final I August 2019 1
TABLE OF CONTENTS
3.3.2 Estimating Potential Exposure and Losses.............................................................3-73
3.3.3 Land Use Development and Trends/Changes in Development..............................3-74
3.3.4 Vulnerable Populations...........................................................................................3-75
3.4 Summary of Vulnerability...................................................................................................3-76
Section 4.0 Mitigation Strategy.......................................................................................................................4-1
4.1 Hazard Mitigation Overview.................................................................................................4-1
4.1.1 FEMA's National Flood Insurance Program..............................................................4-1
4.2 Hazard Mitigation Goals ......................................................................................................4-2
4.3 Identify and Prioritize Mitigation Actions..............................................................................4-2
4.3.1 Hazard Mitigation Benefit-Cost Review.....................................................................4-3
4.4 Regional Considerations......................................................................................................4-6
4.4.1 Regional Fiscal Resources.......................................................................................4-7
Section 5.0 Plan Maintenance.........................................................................................................................5-1
5.1 Monitoring, Evaluating and Updating the Plan.....................................................................5-1
5.1.1 Plan Maintenance.....................................................................................................5-1
5.1.2 Plan Evaluation.........................................................................................................5-1
5.1.3 Plan Updates ............................................................................................................5-2
5.1.4 Adoption....................................................................................................................5-3
5.1.5 Implementation Through Existing Programs.............................................................5-3
5.1.6 Continued Public Involvement...................................................................................5-6
Section6.0 References....................................................................................................................................6-1
APPENDICES
Appendix A Agency Adoption Resolutions
Appendix B Planning Process Documentation
Final I August 2019 11
TABLE OF CONTENTS
LIST OF FIGURES
Figure 1-1 Member Agency Participants........................................................................................................1-10
Figure 3-1 March 17, 2018 PDSI...................................................................................................................3-24
Figure3-2 July 26, 2014 PDSI.......................................................................................................................3-25
Figure 3-3 Ground Shaking Hazard...............................................................................................................3-30
Figure 3-4 Alquist-Priolo Rupture Zones........................................................................................................3-31
Figure 3-5 Location of Earthquake Faults Bounding the CDWC Service Area and Orange County..............3-34
Figure 3-6 Liquefaction Susceptibility Zones.................................................................................................3-36
Figure 3-7 Peak Ground Acceleration with 2 Percent Probability in 50 Years for the United States .............3-39
Figure3-8 Flood Zones .................................................................................................................................3-44
Figure3-9 Subsidence...................................................................................................................................3-47
Figure 3-10 Landslide Susceptibility................................................................................................................3-56
Figure 3-11 Tsunami Hazard Zones................................................................................................................3-60
Figure 3-12 Fire Hazard Severity Zones..........................................................................................................3-65
Final I August 2019 M
TABLE OF CONTENTS
LIST OF TABLES
Table 2-1 DMA 2000 CFR Crosswalk.............................................................................................................2-1
Table 2-2 Members of the Planning Team .....................................................................................................2-3
Table 2-3 Planning Team Meeting Summary.................................................................................................2-6
Table 2-4 Existing Plans and Studies.............................................................................................................2-8
Table 3-1 Hazard Identification.......................................................................................................................3-2
Table3-2 Hazard Rankings............................................................................................................................3-4
Table 3-3 Hazard Ranking Methodology........................................................................................................3-5
Table 3-4 Severe and Extreme SC-PDSI Drought Periods 1920-2012
Lasting 12 Months or Longer(Santa Ana, CA).............................................................................3-23
Table 3-5 Palmer Drought Severity Index.....................................................................................................3-23
Table 3-6 Magnitude 5.0 or Greater Earthquakes in the Southern California Region...................................3-28
Table 3-7 Characteristics of Important Geologic Faults in Orange County...................................................3-33
Table 3-8 Comparison of MMS and Modified Mercalli Intensity Scale..........................................................3-37
Table 3-9 Presidential Disaster Declarations for Flooding in Orange County Since 1969............................3-41
Table 3-10 Major High Wind Events...............................................................................................................3-50
Table 3-11 Major Wildfires..............................................................................................................................3-62
Table 3-12 Unit Replacement Costs of Facilities............................................................................................3-74
Table3-13 Summary Assets..........................................................................................................................3-77
Table 3-14 Planning Area Critical Facilities and Infrastructure Exposure Costs by Hazard ...........................3-78
Table 4-1 STAPLEE Review and Selection Criteria.......................................................................................4-5
Final I August 2019 1V
SECTION ONE Introduction
SECTION 1 INTRODUCTION
Across the United States, natural and manmade disasters have led to increasing levels of death, injury,
property damage, and interruption of business and government services. The impact to water and
wastewater utilities and the individuals they serve can be immense and damages to their infrastructure can
result in regional economic and public health consequences. The water and wastewater utilities are
vulnerable to a variety of hazards that can result in damaged equipment, loss of power, disruption to
services, contaminated water supply, and revenue losses. By planning for natural and manmade hazards
and implementing projects that mitigate risk, utilities can reduce costly damage and improve the
reliability of service following a disaster.
As a best practice Orange County water and wastewater agencies have worked together for decades to
improve regional and local reliability and resiliency through joint or collaborative capital improvement
projects, planning processes and emergency management practices. Throughout the county's history the
need for, and development of, water and wastewater services has been driven by the principles of
economies of scale, and limitations of risk by working together among the wholesale and retail water and
wastewater agencies. Below is a brief history of this collaborative process that developed the framework
for this multi-agency plan today.
• In 1921 the Orange County Joint Outfall Sewer (JOS) is formed. Santa Ana and Anaheim agree
to construct an outfall extending into the Pacific Ocean.
• In 1928 the Cities of Anaheim, Fullerton and Santa Ana realized that groundwater supplies were
insufficient to meet the demands of their growing communities, prompting them to join the
Metropolitan Water District of Southern California (MET) in order to get access to water
imported from the Colorado River.
• In 1931 local agencies again recognized the importance of economies in scale by forming the
Orange County Water District (OCWD). One of the goals of OCWD is to protect Orange
County's Santa Ana River water rights from upstream interest.
• Growth in Orange County continued into the 1940's and 1950's when it was realized that the next
increment of supplies was needed. That is when portions of what is now Orange County(outside
of those original three cities)joined MET. MET was formed for much the same reason in that it
was more economical and less risky to pursue importation of water from the Colorado River and
later Northern California as part of a large co-op rather than having each local entity rely on their
own planning and development of water supplies.
• Following a 1946 Board of Supervisor's Orange County Sewerage Survey Report, seven
individual districts combine into the JOS. While individual cities continue to maintain sewage
collection systems, county-wide collections and treatment become a regional operation. And after
several reiterations becoming the Orange County Sanitation District.
• Later, as Orange County continued to develop and expand, these new developments were located
further and further from the MET pipelines bringing water into Orange County. Economically it
was again much more efficient, and less risky, for local members to ban together to participate in
regional pipelines and other water facilities to convey the MET water from where it was available
to where it was needed. Even today, water reliability planning is conducted based on these
original areas, each with its own supply reliability risk profile. The three areas are:
1. Brea/La Habra service area — have about 80% of their supplies are from Cal Domestic
Water Company groundwater sources in San Gabriel Valley.
Final August 2019 l—l
SECTION ONE Introduction
2. Orange County Water District service area — gets about 75% of their supplies from
groundwater sources
3. South Orange County service area—has few local resources,thereby requiring the import
of about 95%of their potable water demands
• In 1983 the Volunteer Emergency Preparedness Organization (VEPO) was formed, creating a
mutual aid agreement and communications system for Orange County's 33 water utilities to work
together.
• Following the 1994 Northridge Earthquake and subsequent Standardized Emergency
Management System in 1996, OC water agencies recognized the need to staff the VEPO program
as a shared service to support its member agency's disaster readiness.
• VEPO was renamed to the Water Emergency Response Organization of Orange County
(WEROC)in 1999 to better reflect its goal and purpose.
• The agency known today as the South Orange County Wastewater Authority (SOCWA) was
formed in 2001 when the South East Regional Reclamation Authority (SERRA), Aliso Water
Management Agency (AWMA) and South Orange County Reclamation Authority (SOCRA)
consolidated to meet the wastewater needs of more than 500,000 homes and businesses across
South Orange County.
• In 2006 WEROC staff realized the importance of including wastewater agencies in its program,
as many of its water utilities also provided wastewater services and that the sectors had similar
resources that could support each other. With this change, the program welcomed in wastewater
agencies and grew to support 37 agencies in total.
• In 2008 the internationally awarded Ground Water Replenishment System (GWR) was
completed. This was a joint project of the Orange County Water District and the Orange County
Sanitation District enhancing reliability for all of the county.
As has been demonstrated throughout the history of Orange County, the principles of banding together
with neighboring interests to create joint regional infrastructure, connected systems and economies of
scale has been applied time and time again. Working together to develop a multi jurisdictional hazard
mitigation plan focused on the agencies (cities and special districts) that provide drinking water and
wastewater services came from an already standing practice of regional planning and coordination to
improve resiliency and response. Additionally, it gave the participating agencies the opportunity to focus
on risk as it applies specifically to these services and not all of their jurisdiction's services.
In 2005, WEROC started to work with its member agencies, CalOES and FEMA to fund the first multi-
jurisdictional plan through a Hazard Mitigation Planning Grant. In 2007, with the assistance of the
Mitigation Grant, the Municipal Water District of Orange County (MWDOC) along with 20-member
agencies prepared a Multi-Jurisdictional Hazard Mitigation Plan (HMP or Plan) that identified critical
water and wastewater facilities in the county, and mitigation actions in the form of projects and programs
to reduce the impact of natural and manmade hazards on these facilities. The vision of a plan that takes
into consideration regional and local infrastructure and how it works together while building it stronger,
supported other planning efforts such as the South Orange County Reliability Study and later the Orange
County Reliability Study.
This plan builds on the original 2007 Plan and a previous update approved in 2012. MWDOC was joined
in this current update by 18 participating water and wastewater utilities, hereafter, referred to as Member
Agencies (MA),that serve communities in Orange County, California. The Plan was prepared with input
from county residents, orange county emergency managers, and with the support of the California
Governor's Office of Emergency Services (Cal OES) and the Federal Emergency Management Agency
Final I August 2019 1-2
SECTION ONE Introduction
(FEMA). The process to develop the Plan included five planning team meetings and coordination with
representatives from MWDOC and each participating MA.
The Plan is a guide for MWDOC and the MAs over the next five years toward greater disaster resistance
in harmony with the character and needs of the local community and the MAs. The Plan focuses on
participating water and wastewater facilities in the county and identifies mitigation actions to reduce the
impact of natural and manmade hazards on critical facilities. In addition, each agency will utilize current,
approved planning documents that identify implementation strategies for capital improvement, risk
reduction, system upgrades, and operations. These documents complement the Plan and include but are
not limited to: All Hazards SEMS/NIMS Emergency Response Plans, capital improvement plans, and
asset management plans.
The Plan is a working document that will grow and change as our communities and MAs do. This means
at times participating agencies may identify a higher priority than noted in this Plan, or a redirection of
goals based on current information or updated decisions. In consideration of this concept, there may be
projects or policies that need to be considered that were not included in this document. These changes
will be documented during the Plan implementation and formal updates to the Plan will be made every
five years as required.
1.1 PURPOSE OF THE PLAN AND AUTHORITY
Federal legislation has historically provided funding for disaster relief, recovery, and some hazard
mitigation planning. The Disaster Mitigation Act of 2000(DMA 2000)is the latest legislation to improve
this planning process (Public Law 106-390). This legislation reinforces the importance of mitigation
planning and emphasizes planning for disasters before they occur. As such,DMA 2000 establishes a pre-
disaster hazard mitigation program and new requirements for the national post-disaster Hazard Mitigation
Grant Program (HMGP). The Pre-Disaster Mitigation Act of 2010 was signed into law in January of
2011 but does not impact the planning process. The 2010 Act reauthorizes the pre-disaster mitigation
program.
Section 322 of DMA 2000 specifically addresses mitigation planning at the state and local levels. It
identifies the requirements that allow HMGP funds to be used for planning activities and increases the
amount of HMGP funds available to states that have developed a comprehensive, enhanced mitigation
plan prior to a disaster. States and communities must have an approved mitigation plan in place prior to
receiving pre- or post-disaster funds. Local mitigation plans must demonstrate that their proposed
mitigation measures are based on a sound planning process that accounts for the risk to and the
capabilities of the individual communities.
DMA 2000 is intended to facilitate cooperation between state and local authorities, prompting them to
work together. It encourages and rewards local and state pre-disaster planning and promotes
sustainability as a strategy for disaster resistance. This enhanced planning network is intended to enable
local and state governments to articulate accurate needs for mitigation, resulting in faster allocation of
funding and more effective risk reduction projects.
FEMA prepared the Final Rule, published in the Federal Register on September 16, 2009 (Code of
Federal Regulations(CFR) at Title 44, Chapter 1,Part 201 (44 CFR Part 201 and 206)),which establishes
planning and funding criteria for states and local communities.
Final I August 2019 1-3
SECTION ONE Introduction
For federal approval,the following criteria must be met during the planning process:
• Complete documentation of the planning process.
• Detailed risk assessment of hazard exposures in the community and water and wastewater
infrastructure.
• Comprehensive mitigation strategy, describing goals and objectives, proposed strategies,
programs and actions to avoid long-term vulnerabilities.
• A planned maintenance process will describe the method and schedule of monitoring, evaluating
and updating the plan, and the integration of the Plan into other planning mechanisms.
• The formal adoption of the governing bodies of each participating jurisdiction.
• Plan review by both Cal OES and FEMA.
As the cost of recovering from natural disasters continues to increase, the MAs realize the importance of
identifying effective ways to reduce vulnerability to disasters. Hazard mitigation plans assist
communities in reducing risk from natural hazards by identifying resources, information, and strategies
for risk reduction,while guiding and coordinating mitigation activities.
The Orange County Water and Wastewater Hazard Mitigation Plan(HMP or Plan)provides a framework
for participating water and wastewater utilities to plan for natural and man-made hazards in Orange
County. The resources and information within the Plan will allow participating jurisdictions to identify
and prioritize future mitigation projects, meet the requirements of federal assistance programs and grant
applications, and encourage coordination and collaboration in meeting mitigation goals.
The Plan is intended to serve many purposes,including:
• Enhance Public Awareness and Understanding— To help county residents better understand the
natural and man-made hazards that threaten public health, safety, and welfare; economic vitality;
and the operational capability of important facilities;
• Create a Decision Tool for Management— To provide information so that water and wastewater
managers and leaders of local government may act to address vulnerabilities;
• Enhance Local Policies for Hazard Mitigation CapabilitX — To provide the policy basis for
mitigation actions that will create a more disaster-resistant future;
• Provide Inter-Jurisdictional Coordination of Mitigation-Related Programming— To ensure that
proposals for mitigation initiatives are reviewed and coordinated among MWDOC and MAs; and
• Promote Compliance with State and Federal Program Requirements —To ensure that MWDOC
and MAs can take full advantage of state and federal grant programs,policies, and regulations.
To qualify for certain forms of federal aid for pre- and post-disaster funding, local jurisdictions must
comply with the federal DMA 2000 and its implementing regulations. The Plan has been prepared to
meet FEMA and Cal OES requirements, thus making MWDOC and the participating MAs eligible for
funding and technical assistance for State and federal hazard mitigation grant programs.
DMA 2000 requires local hazard mitigation plans, including this Plan, to be updated every five years.
This means that the Plan is designed to carry the MAs through the next five years, after which its
assumptions, goals,and objectives will be revisited,updated, and resubmitted for approval.
Final I August 2019 1-
SECTION ONE Introduction
1.2 MULTI-JURISDICTIONAL PARTICIPATION
1.2.1 Overview of Water and Wastewater Systems in Orange County
Water distribution and wastewater collection and treatment in Orange County involves dozens of agencies
and utilities working together, and relies on integrated, regional systems and facilities. There are several
retail water and wastewater utilities in Orange County, each with its own distinct service area and sources
of potable water. The retail water agencies include water districts and city water departments.
The Municipal Water District of Orange County (MWDOC) is a wholesale water supplier and resource
planning agency that serves all of Orange County(except Anaheim,Fullerton, and Santa Ana)through 28
retail water agencies. MWDOC purchases imported water from the Metropolitan Water District of
Southern California (Metropolitan) for distribution to its member agencies, which provide retail water
services to the public. Local supplies meet more than half of Orange County's total water demand. To
meet the remaining demand, MWDOC purchases imported water from northern California (through the
State Water Project) and the Colorado River. This water is provided by Metropolitan, which in addition
to Orange County, also serves Ventura, Los Angeles, San Bernardino, Riverside, and San Diego
counties.'
Local water supplies in Orange County vary regionally and include groundwater, recycled wastewater,
and surface water. Water supply resources in MWDOC's service area include groundwater basins,which
provide a reliable local source and are also used as reservoirs to store water during wet years and draw
from storage during dry years. Recycled water and surface water provide an additional local source to
some MWDOC retail agencies, with surface water captured mostly from Santiago Creek into Santiago
Reservoir.2
The Orange County Water District (OCWD) manages and replenishes the Orange County Groundwater
Basin (Basin), ensures water reliability and quality, prevents seawater intrusion, and protects Orange
County's rights to Santa Ana River water. The Basin contains approximately 500,000 acre-feet of usable
storage water and covers 270 square miles. The Basin is a reliable source of water and provides
approximately 75 percent of north and central Orange County's water supply, as south Orange County is
virtually 100 percent dependent on imported water.'
MWDOC and OCWD work cooperatively and continue to evaluate new and innovative programs,
including seawater desalination, wetlands expansion, recharge facility construction, surface storage, new
water use efficiency programs, and system interconnections for enhanced reliability.
Wastewater collection and treatment in Orange County is managed by two regional agencies: The Orange
County Sanitation District (OCSD) and the South Orange County Wastewater Authority (SOCWA).
OCSD and SOCWA, which cover north and central Orange County and south Orange County,
respectively, are responsible for the trunk line collection, treatment, biosolids management, and ocean
outfalls for treated wastewater disposal. OCSD has two primary treatment facilities and SOCWA has
three primary treatment facilities that treat wastewater from residential, commercial and industrial
sources.
1 Municipal Water District of Orange County,2015 Urban Water Management Plan,May 2016.
2 Ibid.
3 Orange County Water District,OCWD Brochure,July 2017.
Final I August 2019 1-5
SECTION ONE Introduction
1.2.1.1 Potable Water Supplies— Current and Future
Potable water demand for Orange County was about 485,000 acre-feet per year (AF/yr) in 2017. The
County's population is projected to rise from 3.1 million to 3.7 million people by 2025, and potable water
demand is projected to rise at just about the same rate to about 575,000 AF/yr.
With planned local water-supply projects plus the continued availability of Metropolitan water to
replenish the OCWD Basin, demand projections show a 12 percent decrease in demand for imported, full-
service Metropolitan water by 2025. If the local projects do not get built or produce less than planned or
are merely delayed,then additional Metropolitan water will be needed.
1.2.2 Participating Jurisdictions
Following is a list of the jurisdictions (MAs)participating in the Plan update;refer to Figure 1-1. This list
is organized first by the four utilities that have regional management responsibilities that extend to several
water districts or city utilities and then by local water retail utilities:
• Municipal Water District of Orange County
• Orange County Water District
• Orange County Sanitation District
• South Orange County Wastewater Authority
• City of Buena Park(Utilities Division)
• El Toro Water District
• City of Garden Grove Water Division
• City of La Habra(Water Division and Wastewater Division)
• Laguna Beach County Water District
• Mesa Water District
• Moulton Niguel Water District
• City of Newport Beach(Utilities Department)
• City of Orange (Water and Wastewater Division)
• Santa Margarita Water District
• Serrano Water District
• South Coast Water District
• Trabuco Canyon Water District
• City of Westminster(Water Division)
• Yorba Linda Water District
• Garden Grove Sanitary District
It should be noted that the City of Tustin was a participant in the original 2007 Plan and 2012 Update;
however, the City is not a participant in the 2018 Update. It should also be noted that the Cities
participating in the Plan did not represent all of the services of that city,but rather only the services noted
being water or/and wastewater. This focus was purposeful to support the collaboration of these services
on a regional and local level. Additionally, the city services participating are typically"enterprise funds,"
which allowed for those services to participate in a hazard mitigation process regardless of whether the
entire city could support the planning process fiscally through funding and staff commitments.
Final I August 2019 1-6
SECTION ONE Introduction
Retailers can be grouped into the following three regions based on the availability of local groundwater
resources:
• The Basin provides approximately 75 percent of north and central Orange County's water supply.
The rest of their supply is primarily imported water provided by Metropolitan; although Serrano
Water District and the City of Orange are partly served by local runoff captured in Irvine Lake.
Participating MAs within the Basin include the water departments for the cities of Buena Park,
Garden Grove, Newport Beach, Orange, and Westminster and the Mesa, Serrano, and Yorba
Linda water districts.
• South Orange County is almost 100 percent dependent on Metropolitan for its potable water
supply. Parts of this area are within the San Juan Capistrano Groundwater Basin, which is
managed by the San Juan Basin Authority. Local groundwater in the area is high in salts and
accounts for less of the water supply than utilities in the OCWD Basin. MAs include El Toro,
Laguna Beach County, Moulton Niguel, Santa Margarita, South Coast, and Trabuco Canyon
water districts.
• The Brea/La Habra region receives groundwater from the San Gabriel Basin in Los Angeles
County through the California Domestic Water Company and from Metropolitan. Of the two
utilities in the region, the City of La Habra is a MA. The city also operates a small groundwater
well.
Although located within Orange County, the participating MAs do not comprise or serve the entire
County. In addition, the service areas for each of the MAs participating in the Plan do not necessarily
align with incorporated or unincorporated boundaries or city boundaries. In many cases a MA may serve
multiple cities and/or portions of cities/unincorporated areas. This includes even the city MA further
contributing to why some city MA choose to participate in a sector specific hazard mitigation
plan process. Profiles for each of the participating water and wastewater utilities are provided in the
Jurisdictional Annexes.
The Plan must be formally adopted by each jurisdiction's governing body, which may be the Board of
Directors for each agency and districts and the City Council for each city water and/or wastewater
department. In order to meet the FEMA guidelines for mitigation plans to address a jurisdiction in its
entirety, the participating cities have a current adopted, or are in the process of completing, a single-
jurisdiction local hazard mitigation plan in effect for the entire city. In these cases, it has been incumbent
upon the individual cities and their decision-makers to decide how best to integrate elements of this Plan
into its overall mitigation strategy and other existing plans and processes. Information on each
participating city's single jurisdiction mitigation plan has been provided within their respective annex for
cross-reference. It is recognized that eligibility for hazard mitigation grant funding for the city water
and/or wastewater services within this plan, will occur through an approved and adopted city-wide
mitigation plan.
The resources and background information in the Plan are applicable countywide, providing the
groundwork for goals and recommendations for other local mitigation plans and partnerships. In the
identification of shared action items, the Plan fosters the development of partnerships and implementation
of preventative activities. A unified, multi jurisdictional plan will ensure that any proposals for
mitigation initiatives are reviewed and coordinated among the participating agencies and utilities.
Final I August 2019 1-
SECTION ONE Introduction
1.3 WHAT IS NEW/WHAT HAS CHANGED FROM THE 2012 PLAN
Several sections of the 2018 Plan update have been modified from the original 2007 Plan and 2012 Plan
update, including the use of annexes for each of the participating jurisdictions. Changes made to specific
sections of the Plan are summarized below:
Several sections of the 2018 Plan update have been modified and reorganized from the original 2007 Plan
and 2012 Plan update, including the use of annexes for each of the participating jurisdictions. Changes
made to specific sections of the Plan are summarized below:
• Section One: Section One has been significantly modified to move profile information specific to
each participating jurisdiction to the Jurisdictional Annexes. Text has also been modified to
clarify the multi jurisdictional involvement, updated outdated or irrelevant information, and to
streamline the section. This subsection, what is new/what has changed from the 2012 plan, has
also been added.
• Section Two: Section Two now documents the Planning Process. This section has been
completely revised and updated to discuss the process for the Plan update, including the Planning
Team,meetings,public outreach, and overall process for the Plan update.
• Section Three: Section Three now comprises the Risk Assessment. The hazards have been
updated to reflect hazards that affect the planning area, as determined by the Planning Team.
This includes the removal of tornados and extreme heat (included in the 2012 plan) and the
addition of power outage and climate change. In some cases, the hazards were reorganized or
combined under a primary heading, such as Geologic Hazards, which includes expansive soils
and land subsidence and Seismic Hazards, which include fault rupture, ground shaking and
liquefaction. Each of the hazard profiles were updated to reflect hazard occurrences (if any) since
the 2012 plan was prepared.
In preparation of the 2018 Plan update, infrastructure mapping for each of the MAs was
completed. An independent consultant working directly with MWDOC (who coordinated with
the MAs), updated water and wastewater infrastructure information for each MA. As part of the
2018 Plan update, these critical facilities were overlaid with mapped hazard areas to determine
which assets are in each hazard area and to assess overall vulnerabilities.
• Section Four: Section Four now documents the Mitigation Strategy. This section was renamed
and includes overarching hazard mitigation goals for the planning area. It was determined
through the Planning Team meetings that mitigation goals are similar for all participating
jurisdictions and therefore one set of goals were developed. Some participating jurisdictions
identified additional goals specific to their agencies, which have been included in the respective
Jurisdictional Annex. Updated mitigation actions and capabilities assessments specific to each
participating jurisdiction have been moved to the Jurisdictional Annexes. An overview of hazard
mitigation is provided, including the methodology for identifying and prioritizing mitigation
actions.
• Section Five: Section Five now documents the Plan Maintenance process. This section involves
minor modifications and updates.
Final August2019 1-8
SECTION ONE Introduction
• Section Six: Section Six now documents the Plan references and has been updated to reflect
references used in preparation of the 2018 Plan update.
• Jurisdictional Annexes: The Jurisdictional Annexes are new to the Plan update. An annex is
provided for each MA and includes updated components of the hazard mitigation plan that are
specific to each jurisdiction.
• Appendices: The Appendices have been completely updated to include 2018 Plan update
materials.
1.4 PLAN ORGANIZATION
The Orange County Regional Water and Wastewater HMP is organized into the following sections:
• Section One—Introduction: Provides an overview of the Plan, a discussion of the Plan's purpose
and authority, a description of the multi jurisdictional participation, a summary of how this
update differs from previous versions of the Plan and describes the Plan's organization.
• Section Two —Planning, Process Documentation: Describes the HMP planning process, as well
as the meetings and outreach activities undertaken to engage the MAs and the public.
• Section Three—Risk Assessment: Identifies and profiles the hazards that threaten the area served
by the MAs and identifies the vulnerability and risk to critical water and wastewater infrastructure
associated with each hazard. Due to the vast planning area associated with the MAs participating
in the Plan, this section addresses the entire geographic area served by the MAs. The
Jurisdictional Annexes detail the hazards, risk assessments, and mitigation strategies specific to
each MA.
• Section Four — Mitigation Strategy: Includes multi jurisdictional goals for the 2018 Plan and
summarizes the mitigation action plan process. Mitigation actions and capabilities specific to
each MA are detailed in the Jurisdictional Annexes.
• Section Five — Plan Maintenance: Discusses how the 2018 Plan update will be monitored,
evaluated, and updated over the next five years.
• Section Six—References: Identifies the resources used in preparation of the 2018 Plan update.
• Jurisdiction Annexes: Provides a profile of the jurisdiction, describe the hazards, assess the
vulnerabilities, identify the capabilities, and describe the mitigation strategy specific to each
participating jurisdiction.
• Appendices: Provides the 2018 Plan update materials.
Sections one through seven comprise the primary HMP. It describes the Plan, multi jurisdictional
planning process, and hazard mitigation planning requirements for each MA. The information in these
sections are applicable to all the MAs. The Jurisdictional Annexes provide hazard mitigation planning
information specific to each MA and supplements the information contained in the other sections.
Final I August 2019 1-9
SECTION ONE Introduction
Figure 1-1
Member Agency Plan Participants
SAN
BERNARDINO
LOS ANGELES
�YORBALINDA ;
WATER
DISTRICT RIVERSIDE
1
♦ 1
SERRANO 1 j
WATER ♦ ll I 1
0ISTRICT ♦ 1
ORANGE t ♦♦♦ 1
GARDEN GROVE
J I STE EAST ORANGE
i COUNTYWATER i �I
DISTRICT `� ` ��♦
`'i
` t eat
4. _
♦ E ,f
M DISTRICT R a `. ( TRABUCO
CANYON WATER
DISTRICT
f
byf N BEACH, — ' �` ELT RO 0
WATER j
DISTRICT
SANTA MARGARITA
_ f
1 WATER DISTRICT
MOULTON NIGUEL
LAGUNA WATER DISTRICT
BEACH
COUNTY WATER
DISTRICT
PACIFICOCEAN
SOUTH COAST i•_,—
WATER
DISTRICT
SAN DIEGO
LEGEND
Participating Water Districts _—_— OCWDService Area
® Participating Sanitary Districts OCSDSerweArea
®Par ciPating Water SOCWA Service Area
&Sanitary Districts
r---�
! J MWDOC Service Area 0 2.5 5
Final August 2019 1—10
SECTION TWO Planning Process Documentation
SECTION 2 PLANNING PROCESS DOCUMENTATION
This section describes each stage of the planning process used to update the Multi-Hazard Mitigation Plan
(Plan). The planning process provides a framework to document the Plan's update and follows the
FEMA-recommended steps. The Plan update follows a prescribed series of planning steps, which
includes organizing resources, assessing risk, updating the mitigation actions, updating the Plan,
reviewing and revising the Plan, and adopting and submitting the Plan for approval. Each step is
described in this section.
Hazard mitigation planning in the United States is guided by the statutory regulations described in the
DMA 2000 and implemented through 44 Code of Federal Regulations (CFR) Parts 201 and 206.
FEMA's hazard mitigation plan guidelines outline a four-step planning process for the development and
approval of Hazard Mitigation Plans (HMPs). Table 2-1, DMA 2000 CFR Crosswalk, lists the specific
CFR excerpts that identify the requirements for approval.
Table 2-1
DMA 2000 CFR Crosswalk
DMA 2000(44 CFR 201.6) 2018 Plan Update Section
(1)Organize Resources Section 3
201.6(c)(1) Organize to prepare the plan
201.6(b)(1) Involve the public
201.6(b)(2)and(3) Coordinate with other agencies
(2)Assess Risks Section 4
201.6(c)(2)(i) Assess the hazard
201.6(c)(2)(ii)and(iii) Assess the problem
(3)Develop the Mitigation Plan Section 5
201.6(c)(3)(i) Set goals
201.6(c)(3)(ii) Review possible activities(actions)
201.6(c)(3)(iii) Draft an action plan
(4)Plan Maintenance Section 6
201.6(c)(5) Adopt the plan
201.6(c)(4) Implement,evaluate,and revise
As documented in the corresponding sections, the planning process for the 2018 Plan update is consistent
with the requirements for hazard mitigation planning with customizations, as appropriate. All basic
federal guidance documents and regulations are met through the customized process.
2.1 ORGANIZING RESOURCES
One of the first steps in the planning process involved organization of resources, including identifying the
Project Management Team, and convening the Hazard Mitigation Plan Planning Team (Planning Team)
and performing document review.
Final I August 2019 2-1
SECTION TWO Planning Process Documentation
2.1.1 PROJECT MANAGEMENT TEAM
The Project Management Team was responsible for the day-to-day coordination of the Plan update work
program, including forming and assembling the Planning Team; scheduling Planning Team meetings;
preparing, reviewing, and disseminating Planning Team meeting materials; coordinating, scheduling, and
participating in community engagement activities and meetings; and coordinating document review. The
Project Management Team was led by an Emergency Coordinator from the Water Emergency Response
Organization of Orange County (WEROC), administered by the Municipal Water District of Orange
County (MWDOC), who served as Project Manager and participated on the Planning Team. The Project
Manager monitored planning progress and met with participating jurisdictions as needed to assist with
obtaining and updating information for the Plan. The Project Management Team also included the
Emergency Manager from WEROC/MWDOC, who served as the Project Manager for the 2012 Plan
update and provided guidance as well as historical insight and knowledge associated with the 2012 Plan.
The Project Management Team worked directly with the Consultant Project Management Team
throughout development of the Plan update. The Consultant Team, consisting of a variety of hazard
mitigation/planning professionals, provided guidance and support to MWDOC and the Planning Team
through facilitation of the planning process, data collection, community engagement, and meeting
material and document development.
2.1.2 PLANNING TEAM
The planning process for the Plan update involved ten water districts, two regional wastewater agencies,
and the water departments for eight cities; a total of 20 jurisdictions participated in the planning process.
Representatives from all Member Agencies (MA) provided input into the Plan update process. Each of
the MA provided at least one representative to participate on the Planning Team and attend meetings.
Each local team, made up of other jurisdictional staff/officials, met separately and provided additional
local-level input to the Planning Team representative for inclusion into the Plan. The MA participated in
the planning process by exchanging information, discussing planning strategies, sharing goals, resolving
issues, and monitoring progress. The MA benefited from working closely together because many of the
hazards identified are shared by neighboring jurisdictions and participants were involved in the discussion
of potential mitigation actions. Jurisdictional representatives included but were not limited to utility
engineers,planners,and emergency management officers.
The Planning Team worked together to ensure the success of the planning process and is responsible for
its implementation and future maintenance. The Planning Team's key responsibilities included:
• Participation in Planning Team meetings.
• Coordination of jurisdiction-specific meetings to relay information and obtain input.
• Collection of valuable local information and other requested data.
• Decision on plan process and content.
• Development and prioritization of mitigation actions for the Plan.
• Review and comment on Plan drafts.
• Coordination and involvement in the public engagement process.
Table 2-2, Members of the Planning Team, identifies the Planning Team members and their roles in the
Plan update.
Final I August 2019 2-2
SECTION TWO Planning Process Documentation
Table 2-2
Members of the Planning Team
Name Title/Role Organization Planning Team Role
Project Manager/Planning Team
Representative—Organization of Planning
Emergency Programs Team and meetings,development of and
Francisco Soto Coordinator/Plan Update WEROC/MWDOC participation in community outreach,
Project Manager hazard identification,capabilities
assessment,goal development, mitigation
actions and prioritization,plan coordination
and review.
Project Management Team—Historical
knowledge and insight into 2012 Plan,
Kelly Hubbard WEROC Programs WEROC/MWDOC overall guidance on 2018 Plan update,
Manager hazard identification,capabilities
assessment,goal development, mitigation
actions and prioritization,plan review.
Assistant General Hazard identification,capabilities
Karl Seckel Manager MWDOC assessment,goal development, mitigation
actions and prioritization,plan review.
Orange County Water Hazard identification,capabilities
Paula Bouyounes Risk and Safety Manager District assessment,goal development, mitigation
actions and prioritization,plan review.
Safety and Health Orange County Sanitation Hazard identification,capabilities
Rod Collins assessment,goal development, mitigation
Supervisor District actions and prioritization,plan review.
Human Resources/Risk Orange County Sanitation Hazard identification,capabilities
Richard Spencer assessment,goal development, mitigation
Manager District actions and prioritization,plan review.
Environmental Compliance South Orange County Capabilities assessment,goal
Sean Peacher development, mitigation actions and
Safety Risk Manager Wastewater Authority prioritization,plan review.
Bill Paddock Supervising Mechanic South Orange County Hazard identification.
Wastewater Authority
Hazard identification,capabilities
Michael Grisso Utilities Manager City of Buena Park assessment,goal development, mitigation
actions and prioritization,plan review.
Public Relations/ Hazard identification,capabilities
Sherri Seitz Emergency Preparedness El Toro Water District assessment,goal development, mitigation
Administrator actions and prioritization,plan review.
Rick Olson Operations Superintendent El Toro Water District Hazard identification,capabilities
assessment.
Senior Administrative Hazard identification,capabilities
Katie Victoria City of Garden Grove assessment,goal development, mitigation
Analyst actions and prioritization,plan review.
Raquel Manson Senior Administrative City of Garden Grove Hazard identification,capabilities
Analyst assessment.
Final I August 2019 2-3
SECTION TWO Planning Process Documentation
Table 2-2 [continued]
Members of the Planning Team
Name Title/Role Organization Planning Team Role
A.J. Holmon Streets/Environmental City of Garden Grove Hazard identification.
Division Manager
Brian Jones Water and Sewer Manager City of La Habra Hazard identification,mitigation actions and
prioritization.
Laguna Beach Water Hazard identification,capabilities
Leo Lopez Safety Officer District assessment,goal development, mitigation
actions and prioritization,plan review.
Water Quality and Hazard identification,capabilities
Kaying Lee Compliance Supervisor Mesa Water District assessment,goal development, mitigation
actions and prioritization,plan review.
Safety and Compliance Moulton Niguel Water Hazard identification,capabilities
Tracy Ingebrigtsen Coordinator District assessment,goal development, mitigation
actions and prioritization,plan review.
Dan West Water Distribution Moulton Niguel Water Hazard identification,capabilities
Supervisor District assessment.
Kevin Crawford Operator Moulton Niguel Water Hazard identification.
District
Todd Novacek Director of Operations Moulton Niguel Water Hazard identification.
District
Water Production Hazard identification,capabilities
Casey Parks City of Newport Beach assessment,goal development, mitigation
Supervisor actions and prioritization,plan review.
Steffen Catron Utilities Manager City of Newport Beach Hazard identification,mitigation actions and
prioritization,plan review.
Hazard identification,capabilities
Mark Ouellette Supervisor City of Orange assessment,goal development, mitigation
actions and prioritization,plan review.
Santa Margarita Water Hazard identification,capabilities
Chris Lopez Safety Specialist District assessment,goal development, mitigation
actions and prioritization,plan review.
Daniel Peterson Operations Business Santa Margarita Water Hazard identification.
Manager District
Hazard identification,capabilities
Jerry Vilander General Manager Serrano Water District assessment,goal development, mitigation
actions and prioritization,plan review.
Environmental Health and Hazard identification,capabilities
Trisha Woolslayer Safety Manager South Coast Water District assessment,goal development, mitigation
actions and prioritization,plan review.
Trabuco Canyon Water Hazard identification,capabilities
Lorrie Lausten Principal Engineer District assessment,goal development, mitigation
actions and prioritization,plan review.
Hazard identification,capabilities
Becky Rodstein Administrative Analyst City of Westminster assessment,goal development, mitigation
actions and prioritization,plan review.
Final I August 2019 2-4
SECTION TWO Planning Process Documentation
Table 2-2 [continued]
Members of the Planning Team
Name Title/Role Organization Planning Team Role
Hazard identification,capabilities
Anthony Manzano Senior Project Manager Yorba Linda Water District assessment,goal development, mitigation
actions and prioritization,plan review.
Orange County Sheriffs Overview and perspective of the plan
Ethan Brown Senior Program Department Emergency preparation process and review;
Coordinator Management information relevant to their area of
expertise.
It should be noted that although 20 MA participated in the Plan, all MWDOC's 28 MA were invited to
participate in the Plan either through an Annex or as part of the Planning Team. In addition, through the
Orange County Emergency Management Organization (OCEMO), the County of Orange, and all cities
within the county were provided the opportunity to participate in the Plan process, including
dissemination of the Draft Plan to OCEMO's distribution list for review and comment. This includes all
Orange County cities, colleges, and school districts; special districts; water districts; State and county
agencies;hospital association; affiliates and other approved agencies;refer to Appendix B.
MWDOC also provided an opportunity for State and county agencies and emergency services providers
to be part of the Planning Team. Email invitations were extended to the following:
• State Water Resources Control Board
• Orange County Health Care Agency
• Orange County Fire Agency
• Orange County Sheriff's Department
Businesses, academia and other private and non-profit interests were provided notification of the Draft
Plan's availability via the MA email distribution and notification lists and social media. Distribution
documentation will be provided in Appendix B of the Final Plan.
The Planning Team held five meetings. The meetings were designed to aid the MA in completing a
thorough review of the hazards within their jurisdictions, identifying capabilities, understanding and
assessing vulnerabilities, and identifying mitigation strategies. Table 2-3, Planning Team Meeting
Summary, provides a summary of the meetings. Meeting materials, including PowerPoint presentations,
sign-in sheets, agendas,notes, and other relevant handouts are provided in Appendix B.
Final I August 2019 2-5
SECTION TWO Planning Process Documentation
Table 2-3
Planning Team Meeting Summary
Date Meeting Discussion
July 26,2017 Planning Team Meeting#1 . Introductions
• Project goals and objectives
• Roles and responsibilities
• Data/information needs
• Plan Update and requirements
• Preliminary discussion of community engagement strategy
• Hazard identification and prioritization
• Meeting schedule
August 30,2017 Planning Team Meeting#2 . Summary of hazard profiles
• Risk assessment methodology
• Capabilities assessment
. Community engagement update
• Data/information needs
September 27,2017 Planning Team Meeting#3 . Review/update of goals
. Discussion of mitigation actions
• Community engagement update
• Capabilities assessment
. Data/information needs
January 23,2018 Planning Team Meeting#4 . Overview of process
• Public involvement and survey results
• Overview of vulnerability/risk assessment
• Discussion of hazard mapping
• Schedule for plan review and submittal
April 11,2018 Planning Team Meeting#5 . Review of Draft Plan
• Discussion of comments and revisions
April 11,2019 Planning Team • Meeting with specific MA to address comments from FEMA
hi addition to the regularly scheduled meetings, Planning Team members coordinated individually with
the Plan Update Project Manager, as necessary, to resolve any questions or discuss information requested
at the Planning Team meetings. This was typically accomplished via telephone or email. Any MA that
missed a scheduled planning meeting coordinated with the Project Manager separately to review what
was discussed in the meeting and to obtain jurisdiction-specific information. The City of Orange was not
able to participate directly in the scheduled Planning Team meetings and met separately with the Plan
Update Project Manager to review items discussed at the meetings and provide information necessary for
the Plan update.
2.1.3 PUBLIC OUTREACH
A public outreach and engagement strategy was developed to inform the public and maximize public
involvement in the Plan update process. The public outreach strategy included posting information on the
MA websites, email and social media distribution, community survey, and presentations at the Orange
County Business Council and Orange County Emergency Management Organization meetings, as
described below;refer to Appendix B.
Final I August 2019 2-6
SECTION TWO Planning Process Documentation
MEMBER AGENCY WEBSITES
Information regarding the Plan update was made available on each MA website. The webpages provided
information on the Plan, the Plan update process, and how the public can be involved in the planning
process, including a link to the community survey (discussed below). A link to the draft Plan was also
made available for review and comment.
SOCIAL MEDIA
Social media notifications regarding the Plan update, including a link to the community survey were sent
to MA social media accounts.
COMMUNITY SURVEY
A community survey was developed to obtain input from the community about various hazard mitigation
topics. The survey was designed to help the MA gauge the level of knowledge the community has about
natural disaster issues and to obtain input about areas of the County that may be vulnerable to various
types of natural disasters. The information provided was used to identify and coordinate projects focused
on reducing the risk of injury or damage to property from future hazard events. A link to the survey was
provided on each of the MA websites. Twenty surveys were completed.
STAKEHOLDER OUTREACH
Orange County Business Council—August 8,2017
The Plan Update Project Manager presented to the Orange County Business Council during their monthly
meeting. Francisco presented about hazard mitigation, the planning process, hazards affecting Orange
County water and wastewater infrastructure, and the importance of their involvement in the development
process. Participants of this meeting were extended the opportunity to be part of the Planning Team
and/or provide information and input through the process, including:
• Orange County Transportation Authority(OCTA)
• Metropolitan Water District of Southern California(Metropolitan)
• Southern California Association of Governments(SCAG)
• California Department of Transportation(Caltrans)
• Transportation Corridor Agency(TCA)
Orange County Emergency Management Organization—April 5,2018
The Plan Update Project Manager presented to the OCEMO during their monthly meeting. OCEMO is a
subcommittee comprised of the County of Orange and all subdivisions that ensure the cooperative
maintenance of the Operational Area Emergency Operations Plan, policies and procedures, training and
exercises. Francisco presented about hazard mitigation, the planning process, hazards affecting Orange
County water and wastewater infrastructure, and the importance of their involvement in the development
process. As noted previously, the Draft Plan was disseminated to OCEMO's distribution list for review
and comment;refer to Appendix B.
Final I August 2019 2-
SECTION TWO Planning Process Documentation
Public Review Draft Hazard Mitigation Plan
The public review draft Plan was made available to the public for review and comment for a 30-day
period beginning August 10, 2018 and concluding on September 10, 2018. The draft Plan was made
available on the MA webpages and at the MA offices and/or front counters. Information was provided on
how to submit comments or ask questions regarding the draft Plan.
2.1.4 REVIEW AND INCORPORATE EXISTING INFORMATION
The Planning Team and each MA local team reviewed and assessed existing plans and studies available
from local, state, and federal sources during the planning process. The types of documents reviewed and
incorporated as part of the Plan update are listed in Table 2-4, Existing Plans and Studies. Due to the
number of MA involved in the Plan update, similar plans and studies (e.g., General Plans, Municipal
Codes, Urban Water Management Plans) specific to each jurisdiction were reviewed and incorporated in
the Plan update. A complete list of references is included in Section 7.0,References.
2.2 ASSESS RISKS
In accordance with FEMA requirements, the Planning Team identified and prioritized the hazards
affecting the County and assessed the associated vulnerability from those hazards. Results from this
phase of the planning process aided subsequent identification of appropriate mitigation actions to reduce
risk from these hazards;refer to Section 3.0.
Table 2-4
Existing Plans and Studies
Existing Plans and Studies Planning Process 1 Area of Document Inclusion
Orange County Hazard Mitigation Plan Hazard Profiles;Capabilities Assessment; Mitigation
Strategy
State of California Multi-Hazard Mitigation Plan(2013) Hazard Profiles
Agency Urban Water Management Plans Hazard Profiles;Capabilities Assessment
Local General Plans Hazard Profiles;Capabilities Assessment; Local Plan
Integration
Local Municipal Codes Capabilities Assessment; Mitigation Strategy
FEMA Hazard Mitigation How-to Guides Plan Development; Plan Components
FEMA Local Mitigation Planning Handbook(March 2013) Plan Development; Local Plan Integration Methods
FEMA Mitigation Ideas:A Resource for Reducing Risk to Mitigation Strategy Development
Natural Hazards(January 2013)
Orange County Water and Wastewater GIS Layers with Hazard Profiles; Risk/Vulnerability Assessments; Mitigation
Critical Infrastructure Facilities Strategy
Seismic Hazard Assessment,Orange County Seismic Hazard Profiles; Risk/Vulnerability Assessments; Mitigation
Vulnerability, Mitigation and Recovery Planning Study Strategy
(August 28,2015)
Agency-specific Reliability Studies Hazard Profiles; Risk/Vulnerability Assessments; Mitigation
Strategy
Final I August 2019 2-8
SECTION TWO Planning Process Documentation
2.2.1 IDENTIFY/PROFILE HAZARDS
The Planning Team reviewed the hazards profiled in the 2012 Plan as well as a list of FEMA-identified
hazards to determine which hazards had the potential to impact the County and should be profiled as part
of the Plan update. Both the 2012 Plan and this Plan update include natural and human-caused hazards
that may threaten all or a portion of the County and individual MA. It was noted that some location-
specific hazards would not be applicable to every jurisdiction,but still warranted identification. Through
discussions of the hazards, including the probability, location, maximum probable extent, and potential
secondary impacts, a list of hazards was developed and prioritized. Content for each hazard profile is
provided in Section 3.0.
2.2.2 ASSESS VULNERABILITIES
Hazard profiling exposes the unique characteristics of individual hazards and begins the process of
determining which areas within the County are vulnerable to specific hazard events. The vulnerability
assessment included input from the Planning Team and a GIS overlaying method for hazard risk
assessments using infrastructure mapping completed in preparation of the Plan update. Using these
methodologies, water and wastewater infrastructure impacted by the profiled hazards were identified and
potential loss estimates were determined. Detailed information on the vulnerability assessments for each
hazard is provided in Section 3.0.
2.3 DEVELOP MITIGATION PLANS
The Plan update was prepared in accordance with DMA 2000 and FEMA's HMP guidance documents.
This plan provides an explicit strategy and blueprint for reducing the potential losses identified in the risk
assessment,based on existing authorities,policies,programs, and resources, and the MA ability to expand
on and improve these existing tools. Developing the mitigation plan involved identifying goals, assessing
existing capabilities, and identifying mitigation actions. This step of the planning process is detailed in
Section 4.0 and summarized below.
2.3.1 IDENTIFY GOALS
The Planning Team reviewed the goals identified in the 2012 Plan and determined that many of the MA
shared similar goals. As a result, one set of regional goals were developed as part of the Plan update. The
Mitigation Goals are presented in Section 4.0. For some MA, it was determined that additional goals
specific to their agency were still warranted and are included in the Jurisdiction Annexes, where
applicable.
2.3.2 DEVELOP CAPABILITIES ASSESSMENT
A capabilities assessment is a comprehensive review of all the various mitigation capabilities and tools
currently available to the MA to implement the mitigation actions that are prescribed in the Plan. The
Planning Team reviewed planning and regulatory, administrative and technical, financial, and education
and outreach capabilities to implement mitigation actions. Each MA reviewed capabilities information
from the 2012 Plan and working with their local teams, identified and updated the capabilities assessment
specific to their agency. The capabilities assessments for each MA are included in the Jurisdiction
Annexes.
Final I August 2019 2-9
SECTION TWO Planning Process Documentation
2.3.3 IDENTIFY MITIGATION ACTIONS
As part of the planning process, the Planning Team worked to identify and develop mitigation actions to
address the profiled hazards. The mitigation actions in the 2012 Plan were reviewed to determine
whether they had been achieved, were still relevant, or were no longer relevant due to changing
circumstances. Each MA considered the hazards applicable to their agency and identified and prioritized
mitigation actions. The mitigation actions for each MA are included in the Jurisdiction Annexes.
2.3.4 PLAN REVIEW AND REVISION
Once the draft Plan was completed, a public review period was provided from August 10, 2018 to
September 10, 2018 to allow public review and comments. Comments received on the draft Plan were
reviewed and the Plan was revised,as appropriate.
2.3.5 PLAN ADOPTION AND SUBMITTAL
This plan will be submitted and approved by FEMA and adopted by the MA approving bodies as the
official statement of their hazards. Copies of the resolutions will be provided in Appendix A.
2.3.6 PLAN MAINTENANCE
Plan maintenance procedures, found in Section 5, include the measures each MA will take to ensure the
Plan's continuous long-term implementation. The procedures also include the manner in which the Plan
will be regularly monitored, reported upon, evaluated, and updated to remain a current and meaningful
planning document.
Final I August 2019 2-10
SECTION THREE Risk Assessment
SECTION 3 RISK ASSESSMENT
Risk Assessment requires the collection and analysis of hazard-related data to enable local jurisdictions to
identify and prioritize appropriate mitigation actions that will reduce losses from potential hazards.
FEMA's Local Hazard Mitigation Plan How-to Guide recommends four steps for conducting a risk
assessment:
1. Describe hazards that pose a threat to the planning area;
2. Identify community assets (for the purposes of this Plan this includes water and wastewater
infrastructure) in the planning area;
3. Analyze risks associated with the hazards, including describing the potential impacts and
estimating losses for each hazard; and
4. Summarize vulnerability to understand the most significant risks and vulnerabilities associated
with the identified hazards.
The risk assessment must result in an evaluation of potential impacts and overall vulnerability for each
participating jurisdiction to develop specific mitigation actions. The following identifies the hazards for
the entire planning area and notes if the hazard is applicable to all jurisdictions or is unique to specific
jurisdictions. Hazards applicable to all jurisdictions are described in this section and are not described
separately in the Jurisdictional Annexes. Hazards unique to a jurisdiction are further discussed in the
Jurisdictional Annexes.
3.1 HAZARD IDENTIFICATION AND PRIORITIZATION
3.1.1 Hazard Identification
Hazard identification is the process of identifying hazards that threaten an area including both natural and
man-made events. A natural event causes a hazard when it harms people or property. Such events would
include floods, earthquakes, tsunami, coastal storms, landslides, and wildfires that strike populated areas.
Human-caused hazard events are caused by human activity and include technological hazards and
terrorism. Technological hazards are generally accidental and/or have unintended consequences (for
example, an accidental hazardous materials release). Terrorism is defined by the Code of Federal
Regulations as"...unlawful use of force and violence against persons or property to intimidate or coerce a
government, the civilian population, or any segment thereof, in furtherance of political or social
objectives." Natural hazards that have harmed the County in the past are likely to happen in the future;
consequently, the process of identifying hazards includes determining if the hazard has occurred
previously.
The Planning Team reviewed the list of FEMA-identified hazards,the 2012 Plan, as well as other relevant
information to determine the extent of hazards with potential to affect the planning area; refer to Table 2-
4, Existing Plans and Studies. A discussion of potential hazards during the first Planning Team meeting
resulted in the identification of the natural and human-induced hazards that pose a potential risk to all or a
portion of the County and individual Member Agency (MA). Table 3-1, Hazard Identification,
summarizes the Planning Team's discussion and identification of the hazards for inclusion in the Plan
update.
Final I August 2019 3-1
SECTION THREE Risk Assessment
Table 3-1
Hazard Identification
List of Hazards Included in Included in Discussion Summary
2012 Plan? 2016 Plan?
Not applicable. Snowfall is not a typical occurrence in
Avalanche No No Orange County and there is no historical record of this
hazard in the region.
Climate Change No Yes Climate change is a phenomenon that could exacerbate
hazards. This hazard has been added to the Plan update.
Coastal erosion and storms occur within the coastal
Coastal Erosion No Yes communities, which include development along the coast.
These hazards are combined in the Plan.
Coastal Storm Yes Yes Coastal erosion and storms occur within the coastal
communities. These hazards are combined in the Plan.
Water supplies are susceptible to contamination from
Contamination Yes Yes human activities. In addition, salt water intrusion has
occurred previously due to the low water table.
Several dams and reservoirs are located throughout the
Dam Failure Yes Yes County or in areas that could impact the County in the
event of a failure. Infrastructure is located within inundation
areas. This hazard includes dams and reservoirs.
Disease/Pest Management No No Not applicable. Disease/pest management is not a hazard
that impacts water/wastewater facilities and infrastructure.
Water supplies are dependent upon groundwater and
imported surface water, both of which are susceptible to
Drought Yes Yes drought. The County has experienced historical droughts,
including the most recent State-declared drought
emer enc 2014-2017 .
Alquist-Priolo fault zones occur within the County. The
Earthquake Fault Rupture Yes Yes County has a long history of earthquakes, some resulting in
considerable damage. This topic has been combined with
Seismic Hazards Ground Shaking and Liquefaction).
Expansive soils conditions occur within portions of the
Expansive Soils Yes Yes County and can be exacerbated by seismic ground
shaking. This topic is addressed under Geological
Hazards.
Extreme heat is not a hazard that typically affects the
Extreme Heat Yes No County, which is characterized by mild temperatures. This
hazard has been removed from the Plan update.
Portions of the County are located within floodplains and
Flood Yes Yes have experienced historic flooding. More localized flooding
also occurs during rainstorms.
The County is located in an area of geological hazards,
Geological Hazards Yes Yes including seismic activity. This topic has been combined
with Ex ansive Soils and Land Subsidence.
Hailstorm No No Not applicable. Hailstorms rarely occur within the County
and there is no historical record of this hazard in the re on.
Water supplies could be compromised from accidental or
Hazardous Materials Yes Yes intentional release of hazardous materials. These topical
areas are addressed under Human-Caused Hazards.
Final I August 2019 3-2
SECTION THREE Risk Assessment
Table 3-1 [continued]
Hazard Identification
List of Hazards Included in Included in Discussion Summary
2012 Plan? 2016 Plan?
Water supplies could be compromised from release of
hazardous materials or as a result of terrorist activities.
Human-Caused Hazards Yes Yes Heightened security concerns have resulted in increased
measures to protect infrastructure systems. These topical
areas are addressed under Human-Caused Hazards.
Hurricane No No Not applicable.
Land Subsidence Yes Yes Land subsidence conditions occur within the County. This
topic is addressed under Geological Hazards.
Areas of the County are susceptible to landslide and
Landslide and Mudflow Yes Yes mudflow which can be exacerbated by other hazards
including seismic ground shaking, drought conditions, and
wildfires.
Not applicable. Although lightning sometimes occurs
Lightning No No during storm events, it is limited within the region and there
is no historical record of this hazard in the region.
Liquefaction zones occur within the County. This topic has
Liquefaction Yes Yes been combined with Earthquake Fault Rupture and Seismic
Hazards Ground Shaking and Liquefaction).
Although typically associated with other hazards, power
Power outage No Yes outages can directly impact water and wastewater systems
and has been added to the Plan update.
Sea level rise has been identified as a hazard affecting
Sea Level Rise No Yes some of the coastal communities. This hazard has been
added to the Plan update.
The County has a long history of earthquakes, some
Seismic Hazards Yes Yes resulting in considerable damage. This topic has been
combined with Earthquake Fault Rupture and addresses
Ground Shaking and Liquefaction.
Not applicable. Severe winter storms are not common in
Severe Winter Storm No No the County and there are no historical records of this
hazard in the region.
Tornado Yes No Tornados are not a typical occurrence in the County. This
topic has been removed from the Plan.
Tsunami Yes Yes Portions of the Orange County coastline are identified as
tsunami inundation areas.
Volcano No No Not applicable. There are no active volcanoes in the
County or surrounding area.
Portions of the County are located within very high and high
Wildfire Yes Yes fire hazard zones, which are adjacent to existing urban
development. Wildland and urban fires are combined
to ics in the Plan.
Regular wind is not a typical occurrence and does not
Wind No No cause severe damage within the area. High winds/Santa
Ana winds are common throughout the County and are
addressed in the Plan see Windstorm below).
Windstorm Yes Yes High Winds/Santa Ana Winds are a common occurrence in
the planning area and can impact power transmission lines.
Final I August 2019 3-3
SECTION THREE Risk Assessment
3.1.2 Hazard Prioritization
The Planning Team used a Microsoft Excel-based tool to prioritize the identified hazards by assigning
each hazard a ranking based on probability of occurrence and the potential impact. These rankings were
assigned based on a group discussion, knowledge of past occurrences, and familiarity with each MAs
vulnerabilities. Four criteria were used to establish priority:
• Probability(likelihood of occurrence)
• Location(size of potentially affected area)
• Maximum Probable Extent(intensity of damage)
• Secondary Impacts(severity of impacts to community)
A value from 1 to 4 was assigned for each criterion. The four criteria were then weighted based on the
Planning Team's opinion of each criterion's importance. Table 3-2, Hazard Rankings, presents the
results of the hazard rankings.
Table 3-2
Hazard Rankings
Impact Total Hazard
Hazard Type Probability Affected Primary Secondary Score Planning
Area Impact Impact Consideration
WPoweroutage 4 3 4 4 57.60 High
Wildfire 4 3 3 4 52.00 High
Seismic Hazards—Ground Shaking 3 3 4 4 43.20 High
Seismic Hazards—Liquefaction 3 3 4 4 43.20 High
High Winds/Santa Ana Winds 4 4 2 1 40.80 Medium
Drought 4 4 1 1 35.20 Medium
Dam/Reservoir Failure 2 3 4 4 28.80 Medium
Flood 3 3 2 1 25.80 Medium
Earthquake Fault Rupture 2 1 4 2 18.40 Medium
Landslide/Mudflow 2 2 2 3 18.00 Medium
Contamination 1 2 3 4 11.40 Low
Human-Cause Hazards—Terrorism 1 1 3 3 8.80 Low
Human-Caused Hazards—Hazardous Materials 1 1 2 3 7.40 Low
Urban Fire 1 1 2 1 5.40 Low
Geologic Hazards—Land Subsidence 1 1 1 2 5.00 Low
Geologic Hazards—Expansive Soils 1 1 1 2 5.00 Low
Tsunami 1 1 1 1 1 1 1 1 4.00 1 Low
Scores are based on a scale from 1 to 4,where 4 is the highest score and 1 is the lowest. Refer to Table 3-3 for additional information.
The total score is based on an equation that weights categories by importance. Refer to Table 3-3 for additional information.
Final I August 2019 3-
SECTION THREE Risk Assessment
Table 3-3, Hazard Ranking Methodology, provides additional detail regarding how the probability,
affected area, and impact categories are weighted and how the total score is calculated for the hazard
rankings.
Table 3-3
Hazard Ranking Methodology
Probability Importance 2.0 Secondary Impacts FImportance 0.5
Based on estimated likelihood of occurrence from Based on estimated secondary impacts to community at large.
historical data.
Probability Score Impact Score
Unlikely (less than 1% probability in next Negligible — no loss of function, downtime,
100 years or has a recurrence interval of 1 and/or evacuations 1
greater than every 100 years)
Somewhat Likely (between 1% and 10% Limited — minimal loss of function, downtime,
probability in next year or has a 2 and/or evacuations 2
recurrence interval of 11 to 100 years)
Likely (between 10% and 100% Moderate — some loss of function, downtime,
probability in next year or has a 3 and/or evacuations 3
recurrence interval of 10 years or less)
Highly Likely (near 100% probability in 4 High — major loss of function, downtime, 4
next year or happens every year) and/or evacuations
Affected Importance 0.8 Total Score=Probability x Impact,where:
Area
Based on size of geographical area of community
Probability=(Probability Score x Importance)
affected by hazard.
Affected Area Score Impact= (Affected Area + Primary Impact + Secondary Impacts),
where:
Isolated 1 Affected Area=Affected Area Score x Importance
Small 2 Primary Impact= Primary Impact Score x Importance
Medium 3 Secondary Impacts=Secondary Impacts Score x Importance
Large 4
Primary Importance 0.8 Hazard Planning Consideration
Impact
Based on percentage of damage to typical facility in Hazard
-ommunity. Total Score Range Distribution Level
Impact Score 0.0 20.0 0 Low
Negligible—less than 10%damage 1 20.1 42.0 6 Medium
Limited — between 10% and 25% 2 42.1 64.0 3 High
damage
Critical—between 25%and 50%damage 3
Catastrophic—more than 50%damage 4
The probability of each hazard is determined by assigning a level,from unlikely to highly likely,based on the likelihood of occurrence from
historical data. The total impact value includes the affected area,primary impact,and secondary impact levels of each hazard. Each level's
score is reflected in the matrix. The total score for each hazard is the probability score multiplied by its importance factor times the sum of
the impact level scores multiplied by their importance factors. Based on this total score,the hazards are separated into three categories
based on the hazard level they pose to the communities:High,Medium,and Low.
Final I August 2019 3-5
SECTION THREE Risk Assessment
It should be noted that climate change and coastal storm/erosion were not prioritized for the planning
area; refer to the Jurisdiction Annexes for an assessment of each of the hazards specific to the individual
jurisdiction. Although climate change is identified as a hazard in the Plan update, there was not
consensus on how it impacts the individual jurisdictions. Similarly, coastal storm/erosion was considered
distinct to specific MAs and potentially exacerbated by climate change. Regardless of the prioritization
(low,medium, or high), it was determined by the Planning Team that all the hazards identified in Table 3-
1 would be profiled. Due to the vast geography and hazards that impact the various MAs, it was
recognized by the Planning Team that some hazards that ranked low overall, may be a high priority
depending upon the jurisdiction.
3.2 HAZARD PROFILES
This section contains profiles for the hazards identified in Table 3-1. Due to the nature of the hazards,
some hazards were combined for purposes of the profiles as noted in Table 3-1. Information was
obtained from various Federal, State and local sources, as well as the Planning Team. A detailed list of
References is provided in Section 6.0.
The service areas for each of the MAs participating in the Plan update do not always align with
incorporated City or unincorporated County boundaries. In many cases, a MA may serve multiple cities
and/or portions of cities/unincorporated areas. For purposes of this Plan update, the planning area refers
to Orange County, since the MAs provide services and infrastructure throughout most of the County.
Because much of the available hazard data is provided by jurisdictional boundary (County or City), it is
not always possible to obtain or delineate data specific to the MA jurisdictional (service) boundary. The
Jurisdictional Annexes detail the hazards, risk assessments, and mitigation strategies specific to each
jurisdiction.
Each hazard profile addresses the following:
• Description (Nature) of the Hazard: Describes the hazard and its characteristics.
• History/Past Occurrences: Provides a history of the hazard and identifies previous occurrences.
Where an occurrence is specific to a MA,this information is provided.
• Location/Geo�phic Extent: Describes the location(geographic) area affected by the hazard. If
the hazard affects the entire planning area, it is noted. For geographically specific hazards, the
specific MAs affected by the hazard are identified and discussed further in the Jurisdictional
Annexes.
• Magnitude/Severity: Describes the extent(magnitude or severity) of each hazard. If a hazard has
a uniform extent for all the MAs, it is noted. For geographically specific hazards, mapping is
provided that illustrates the extent of the hazard for the entire planning area. Mapping for
applicable hazards specific to a MA are provided in the Jurisdictional Annexes.
• Probability of Future Occurrences: Provides a discussion of the probability of future
occurrences of the hazard based on the history of past occurrence, location, and severity. If the
likelihood of occurrence is the same for all jurisdictions or varies amongst the jurisdictions, it is
noted.
Final August 2019 3-6
SECTION THREE Risk Assessment
3.2.1 Climate Change
3.2.1.1 Description (Nature) of the Hazard
According to NASA's Global Climate Change website, the mean global temperature has increased 1.8
degrees Fahrenheit since 1880, and 17 of the 18 warmest years on record have occurred since 2000 The
scientific consensus is that these changes are the result of human activity increasing the levels of carbon
dioxide and other greenhouse gases in the atmosphere, and that they will intensify. The
Intergovernmental Panel on Climate Change forecasts temperatures to rise an additional 2.5 to 10 degrees
over the next century. Such drastic changes to the earth's climate will have significant consequences
around the globe. Long-term effects include rising sea levels due to melting ice, changes in precipitation
patterns,heat waves,and more frequent and intense storms.
Based on local data from the National Oceanic and Atmospheric Administration (NOAA)2, Orange
County can expect to see its daily maximum temperature increase from a current annual average of 73
degrees to 78 degrees by 2100 under a low-emission scenario and 82 degrees under a high-emission
scenario. The County currently experiences an average of 4.5 days a year where temperatures reach 95
degrees; that is projected to increase to as many as 31 days a year. Under both emission scenarios, the
County is likely to see a 43 to 44 percent increase in the amount of rain that falls during the winter by the
latter half of the century.
Climate Change presents a number of challenges for Orange County. According to the 2014 National
Climate Assessment Report, as is common in coastal areas, many roads and bridges, high-priced homes,
and wastewater systems are located in low-lying areas near the ocean. Increases in storm water runoff
have the potential to overwhelm the capacity of wastewater and drainage systems, flood control channels,
and pump stations. Climate change may endanger vulnerable coastal ecosystems and wildlife habitats or
degrade water quality at beaches. In addition, because the region relies extensively on imported water,
climate effects beyond Orange County, particularly in Northern California and the Colorado River
watershed,will have consequences for the County's water supply.
Climate change may influence many of the other hazards addressed in this plan. As the oceans rise,more
areas may be subject to coastal flooding and tsunami risk, coastal erosion may increase, and aquifers may
be contaminated by additional salt water intrusion. Seasonal changes in rainfall may result in greater risk
of flooding, dam failure, drought, wildfire, land subsidence, expansive soils, and landslides and
mudflows. Extreme heat can reduce soil moisture, further exacerbating such hazards as drought, wildfire,
and expansive soils.
This profile focuses on the hazard of coastal flooding as a result of sea-level rise, while any interactions
between climate change and other hazards will be primarily addressed in those hazard profiles. In
contrast to the Atlantic and Gulf coasts, where coastal flooding is mainly associated with major storms,
flooding along the Pacific Coast is the result of a number of more subtle factors, including tidal cycles;
the El Nino climate pattern; distant,wind-generated ocean swells; local storms; and the time of year. Sea-
level rise means that more areas will be more susceptible to the complex interactions between these
processes and more frequent flooding.
1 NASA(2018, March 19). Global Climate Change Vital Signs of the Planet. https://climate.nasa.gov/. Accessed
March 2018.
2 U.S. Climate Resilience Toolkit, The Climate Explorer. https://tooBdt.climate.gov/climate-explorer2/. Accessed
March 2018.
Final I August 2019 3-
SECTION THREE Risk Assessment
3.2.1.2 History/Past Occurrences
NOAA offers an online Climate Explorer toolkit3 that shows climate projections and observed historical
trends by county. The data shows that, from 1949 to 2009, the daily maximum temperature in Orange
County has been gradually rising at a rate of about 0.02 degrees Fahrenheit per year. This is expected to
accelerate through the end of the century, although the degree depends on the success of efforts to limit
global carbon emissions.
NASA reports that the global average sea level has risen almost 7 inches in the last 100 years. Rising sea
levels have been observed in Orange County, as well. Measurements taken at Newport Beach since 1955
show that the sea level there has risen an average of 2.22 millimeters, or 0.09 inches, per year.4 This is
also expected to accelerate as more ice melts due to rising global temperatures.
King tides have flooded Orange County coastal communities, including Seal Beach, Huntington Beach,
Balboa Peninsula and Balboa Island in Newport Beach, and Sunset Beach in the past.5 In the last 10
years, the National Centers for Environmental Information (NCEn Storm Events Database reports four
coastal flooding incidents affecting Orange County: in October and November 2015, and May and
October 2017. It is difficult to say how higher sea levels may have affected the severity of these events.
The independent organization Climate Central estimates that La Jolla, California, located 46 miles from
Huntington Beach, experienced 60 days of coastal flooding between 2005 and 2014, based on observed
impacts such as flooded roads. Of those events, only four would have occurred without climate-linked
sea-level rise.6
3.2.1.3 Location/Geographic Extent
Sea-level rise presents a risk for all coastal communities with low-lying areas. In Orange County,
Huntington Beach is particularly vulnerable.
A 2017 report by the Union of Concerned Scientists, "When Rising Seas Hit Home," includes a mapping
tool that shows what coastal areas will experience flooding at least 26 times a year under various sea-level
rise scenarios. Under a moderate scenario of a 4-foot rise, the area of north Orange County roughly
bounded by the Santa Ana River and State Route 22 will see 14 percent of its land chronically inundated
by 2100, even with existing levees. With a rise of 6 feet, 24 percent of the land will be chronically
inundated. Affected areas include neighborhoods in Seal Beach,Huntington Beach, and Newport Beach.
NOAA offers another mapping tool to visualize areas vulnerable to flooding due to climate change. Its
Sea Level Rise Viewer projects that, with a 1-foot rise in sea levels, there will be flooding through many
parts of southeastern Huntington Beach, including neighborhoods between the Talbert Chanel and
Huntington Beach Channel. A 2-foot rise will also start to affect parts of Sunset Beach and Balboa Island
in Newport Beach, as well as less developed areas of Upper Newport Bay, Bolsa Chica Ecological
Reserve.
s Available at https://toolkit.climate.gov/climate-explorer2/
a NOAA. Tides and Currents. https://tidesandcurrents.noaa.gov/sltrends/sltrends_station.shtml?stnid=9410580.
Accessed March 2018.
5 The OCR. January 10, 2017. Orange County Beach Cities Bracing for 7-foot King Tides; Flooding Possible.
https://www.ocregister.com/2017/01/10/orange-county-beach-cities-bracing-for-7-foot-king-tides-flooding-possible/. Accessed
March 2018.
6 Climate Central, Surging Seas Risk Finder. https://riskfinder.climatecentral.org/place/huntington-beach.ca.us?
comparisonType=place&forecastName=Single-year&forecastType=NOAA2017_int_p50&level=3&unit=ft. Accessed March
2018.
Final I August 2019 3-8
SECTION THREE Risk Assessment
3.2.1.4 Magnitude/Severity
Sea level is measured by local tide gauges and satellite. Sea-level rise describes projected changes in
those measurements based on different climate models. NOAA's Sea Level Rise Viewer projects that the
sea level at Newport Bay will rise by at least 0.75 feet and as much as 2.72 feet by 2050, based on
different global scenarios. By 2100, the level may rise by as much as 10.14 feet under the most extreme
scenario.
3.2.1.5 Probability of Future Occurrences
FEMA's Flood Insurance Rate Map (FIRM) panels, which show areas that are subject to a 1 percent
annual chance of flooding, reflect only current risk; they do not attempt to make projections based on
anticipated changes due to climate change and sea-level rise.
Climate Central's Surging Sea Risk Finder attempts to estimate the probability that coastal floods will
reach elevations above the local high tide line. The tool does not have estimates for every tide gauge, and
estimates for Orange County are based on data from the gauge at Los Angeles' Outer Harbor. It shows
that, while there is currently less than a 1 percent chance of coastal flooding reaching areas three feet
above the tide line in any given year, those chances increased to 6 percent annually by 2040 under a
medium sea-level rise scenario. By 2070, these areas will be flooding every year. Under an extreme
scenario, annual flooding will happen as soon as 2040.
3.2.2 Coastal Storms/Erosion
3.2.2.1 Nature of Hazard
Erosion is a naturally occurring phenomenon all along California's coastline. Erosion can be severe
during winter storms, which are often accompanied by high surf, particularly during El Nino events.
Rising sea levels caused by climate change will increase coastal erosion by exacerbating the impact of
high tides and waves. Climate change is also expected to increase the frequency and severity of storms.
As a result, even areas that have not experienced significant erosion in the past may be at risk in the
future. (Effects of climate change are discussed in detail in Section 3.1.1).
Erosion can also be affected by manmade structures that impede the deposit of new sediment at beaches;
these include inland dams, channelized rivers, harbors,jetties, and seawalls/revetments.' This has been
the case in Orange County, where the channelization of the Santa Ana River has reduced the amount of
sediment reaching the coast, while the construction of jetties at Anaheim Bay and breakwaters at Long
Beach have changed deposit patterns.' This led to the formation of several chronic erosion hotspots along
the County's coastline. In some cases, long-term beach replenishment efforts and management plans
have been able to counteract or reverse these trends.
In addition to the gradual narrowing of sandy beaches, storms and erosion can damage steep coastal bluffs
and cliffs. Landforms that appear to have been stable for years may retreat several feet in just a few
hours. In either case, erosion can cause considerable damage to coastal infrastructure and property. As
7 Coastal Erosion — Needs for Beach Nourishment. http://www.dbw.ca.gov/csmw/PDF/Results—From—CSMW—
Taskl.pdf
8 California Beach Restoration Study. January 2002. https://www.parks.ca.gov/pages/28702/files/cbrs—ch6—
effectiveness.pdf.
Final I August 2019 3-9
SECTION THREE Risk Assessment
Orange County's beaches are centers for recreation and tourism, loss of land has economic consequences,
as well.
3.2.2.2 History/Past Occurrences
Problems with chronic erosion in Orange County have been recognized since at least 1945, when beach
nourishment operations were undertaken to shore up the eroding Surfside-Sunset shoreline.' A 2006 U.S.
Geological Survey (USGS) assessment of the entire California coast found that, between Los Angeles
Harbor and Dana Point, the shoreline had receded since the early 1970s for 35 percent of the 29-miles
coastline. Beach nourishment projects prevented further observable erosion during this period.
California typically experiences the most erosion during significant El Nino events. The three strongest
El Nino events on record were during the winters of 1982-1983, 1997-1998, and 2015-2016. Historic
erosion was reported all along the West Coast in 2015-2016, according to the USGS.10 While the winter
storms brought extreme wave action to California's shores,they featured surprisingly little rainfall. With
California in the midst of a major drought, less sediment was washed to the ocean to replenish beaches.
Portions of beaches in San Clemente and Laguna Beach were temporarily closed to the public due to
hazardous conditions.'1
3.2.2.3 Location/Geographic Extent
Orange County's coastline includes sand and cobble beaches,rocky cliffs and coastal bluffs, and intertidal
areas. In general, beach erosion is more of an issue along the County's northern coast,while bluff retreat
is a greater concern along the southern portion.
Beginning in 1964, the Orange County Erosion Control Project targeted Surfside-Sunset and West
Newport Beach as locations in need of restoration. The U.S. Army Corps of Engineers spearheaded
efforts to import sand and installing retention devices in these areas.
The 2006 USGS study found that West Newport Beach had the largest measurable erosion rate in Orange
County between the early 1970s and 1998.
As part of the Coastal Storm Modeling System (CoSMoS), data available from the USGS shows the
projected location of the California shoreline under various scenarios of sea-level rise. The Coastal Storm
Modeling System (CoSMoS-COAST) shows that with a 3.3-foot rise in sea levels, Huntington State
Beach will see the greatest erosion, followed by parts of Huntington City Beach, West Newport Beach,
Surfside, and Bolsa Chica State Beach.
3.2.2.4 Magnitude/Severity
Erosion is usually described in terms of how much the beach width deceases per year. The 2006 USGS
study, for example, found that erosion at West Newport Beach was at a rate of -2.2 meters per year.
9 California Beach Restoration Study. January 2002. https://www.parks.ca.gov/pages/28702/files/cbrs_ch6_
effectiveness.pdf.
10 USGS. February 14, 2017. Severe West Coast Erosion During 2015-16 El Nino. https://www.usgs.gov/news/
severe-west-coast-erosion-during-2015-16-el-ni-o.
11 The Orange County Register. February 9,2016. Our Eroding Coastline:Recent storms are reshaping beaches,and
some are getting tougher to visit. https://www.ocregister.com/2016/02/09/our-eroding-coastline-recent-storms-are-reshaping-
beaches-and-some-are-getting-tougher-to-visit/.Accessed August 2017.
Final I August 2019 3-10
SECTION THREE Risk Assessment
Overall, the shoreline of Los Angeles Harbor and Dana Point grew by an average of 0.5 meters per year,
the highest rate in all of California, due largely to beach nourishment projects. Among those sections that
did experience erosion, it happened at an average rate of-0.5 meters per year.
The volume of sand used to fight erosion can also indicate the magnitude of the problem. For example,
from 1945 to 2009, more than 20 million cubic yards of sediment has been added to Surfside-Sunset
Beach.12
3.2.2.5 Probability of Future Occurrences
Climate change all but ensures that the entire Orange County coast will experience some degree of
erosion through the end of the century. The amount will depend on how much sea levels rise, which is
contingent on global efforts to curb greenhouse gas emissions. An online mapping tool produced by Our
Coast Our Future, a collaborative effort of 15 organizations including the USGS and California Coastal
Commission, using CoSMoS data projects that very few sections of the County's shoreline will maintain
their current position assuming a 3.3-foot rise in sea level, even with the continuation of current beach
nourishment efforts.
A new study released in 2017 using CoSMoS data found that, without human intervention, 31 to 67
percent of Southern California beaches may be completely eroded by 2100 if sea levels rise by 1 to 2
meters.'3
3.2.3 Contamination/Salt Water Intrusion
3.2.3.1 Description (Nature) of the Hazard
GROUNDWATER CONTAMINATION
Groundwater contamination occurs when pollutants are released to the ground, navigate through the soil,
and ultimately end up in the groundwater. Human activity is almost always the underlying cause of
groundwater contamination. In areas where population density is high and human use of land is intensive,
groundwater is especially vulnerable. Virtually any activity whereby chemicals or wastes may be
released to the environment, either intentionally or accidentally,has the potential to pollute groundwater.
SALT WATER INTRUSION
When fresh water is withdrawn from aquifers at a faster rate than it is replenished, a drawdown of the
water table occurs with a resulting decrease in the overall hydrostatic pressure. When this happens near a
coastal ocean area, salt water from the ocean can intrude into the fresh water aquifer. The result is that
fresh water supplies become contaminated with salt water.
" U.S.Army Corps of Engineers. 2012.Orange County Coastal Regional Sediment Management Plan Draft Report.
http://www.dbw.ca.gov/csmw/pdf/OCCRSMP DraftReport.pdf.
13 USGS. March 27,2017. Disappearing Beaches: Modeling Shoreline Chane in Southern California. https://www.
usgs.gov/news/disappearing-beaches-modeling-shoreline-change-southern-califomia.
Final I August 2019 3-1 1
SECTION THREE Risk Assessment
3.2.3.2 History/Past Occurrences
GROUNDWATER CONTAMINATION
Over the last several decades, Orange County's North Basin has experienced industrial solvent spills and
leaks from manufacturing, metals processing businesses, and dry-cleaning facilities. As a result, a
contamination plume several miles long and over a mile wide currently exists under the cities of
Fullerton, Anaheim, and Placentia. The Orange County groundwater basin is a source of drinking water
for the region,providing most of the water used in 22 cities. The contamination plume has already taken
five wells off line, including three of Fullerton's 12 total wells. Those wells draw water from shallower
sources closer to the surface and consequently are closer to the pollution. Under the supervision of the
United States Environmental Protection Agency (USEPA), a remedial investigation and feasibility study
will be conducted to address the extent of contamination and to develop an initial cleanup plan.
Salt Water Intrusion
In Orange County, by 1956, years of heavy pumping to sustain the region's agricultural economy had
lowered the water table by 15-feet below sea level and saltwater from the Pacific Ocean had encroached
as far as five miles inland. The area of intrusion is primarily across a four-mile front between the cities of
Newport Beach and Huntington Beach known as the Talbert Gap. The mouth of an alluvial fan formed
millions of years ago by the Santa Ana River; the Talbert Gap has since been buried along the coast by
several hundred feet of clay. In 1976 the Water Factory 21 Direct Injection Project, operated by OCWD,
began injecting highly treated recycled water into the aquifer to prevent salt water intrusion, while
augmenting the potable groundwater supply. This system was shutdown to make way for the
Groundwater Replenishment System (GWRS) Project which began operation in 2008. The GWRS
provides highly treated water for injection into the seawater barrier system to prevent seawater intrusion
into the groundwater basin managed by OCWD. As of March 21, 2018, approximately 248 billion
gallons of water have been successfully treated and injected into the seawater barrier system.
3.2.3.3 Location/Geographic Extent
Groundwater contamination may occur County wide by means of intentional or accidental spillage to
groundwater.
Conversely, the coastal area of the Basin is vulnerable to seawater intrusion due to geologic features and
increased pumping from inland municipal wells to meet consumer demands. The susceptible locations in
the Basin are the Talbert,Bolsa, Sunset, and Alamitos Gaps.
3.2.3.4 Magnitude/Severity
The 1974 Safe Drinking Water Act require the USEPA set standards for contaminants in drinking water
that may pose health risks to humans. The USEPA standard for lifetime exposures in drinking water, the
maximum contaminant level (MCL), is the highest amount of a contaminant allowed in drinking water
supplied by municipal water systems.14 In Orange County over 700 monitoring wells assess water quality
conditions." Thus, it is unlikely that human consumption of contaminated groundwater will occur. A
14 USEPA. National Primary Drinking Water Regulations. https://www.epa.gov/ground-water-and-drinking-water/
national-primary-drinking-water-regulations.
is Orange County Water District Groundwater Management Plan. 2015. https://www.ocwd.com/media/3622/
groundwatermanagementplan20l 5update_20150624.pdf.
Final I August 2019 3-12
SECTION THREE Risk Assessment
large environmental spill could result in contamination of groundwater; however, the extent and the
severity cannot be predicted. Based on historical occurrences, a contamination in the groundwater basin
could extend several miles and result in water wells being unavailable.
Massive seawater intrusion has been prevented in Orange County by the OCWD basin management
programs. However, the threat of saltwater intrusion along the coast is still present. To prevent further
intrusion and to provide basin management flexibility, OCWD operates a hydraulic barrier system. A
series of 23 multi-point injection wells four miles inland delivers fresh water into the underground
aquifers to form a water mound, blocking further passage of seawater. Continued injection of recycled
water into the aquifer is essential to keep saltwater from intruding into the groundwater table and
contaminating a major source of the county's potable water. OCWD maintains the Coastal Aquifer
Mergence Zones and Chloride Concentration map, which indicates a 250 mg/L Chloride Concentration
Contour. This contour is used to indicate the approximate leading edge of seawater intrusion. OCWD
monitors the movement of the chloride contour to provide an indication of whether seawater intrusion is
worsening or improving in a given area.
3.2.3.5 Probability of Future Occurrences
Due to the amount and types of urban development that occur within the County, and the transportation
systems that allow for the movement of hazardous materials through the County and greater region, future
groundwater contamination is likely. However, as a result of groundwater monitoring and protection
systems,human consumption of contaminated groundwater is unlikely.
Due to the successful operation of the OCWD basin management programs, the probability of saltwater
intrusion to occur in the future is unlikely.
3.2.4 Dam/Reservoir Failure
3.2.4.1 Description (Nature) of the Hazard
Dam failures can result from several natural or human caused threats such as earthquakes, erosion of the
face or foundation, improper silting, rapidly rising flood waters, malicious events, and structural/design
flaws. Seismic activity can also compromise dam regulating structures,resulting in catastrophic flooding.
A dam failure can cause loss of life, damage to property, the displacement of persons, and other ensuing
hazards residing in the inundation path. Damage to electric generating facilities and transmission lines
could also impact life support systems in communities outside the immediate hazard areas.
In the event of a major dam failure, mutual aid from all levels of government would be required for an
extended period. Recovery efforts would include the removal of debris, clearing roadways, demolishing
unsafe structures, assistance in reestablishing public services, and providing continued care and welfare
for the affected population.
There are 33 dams in Orange County with ownership ranging from the Federal government to
homeowners' associations. These dams hold billions of gallons of water in reservoirs. The major
reservoirs are designed to protect Southern California from flood waters and to store domestic and
recycled water.
Final I August 2019 3-13
SECTION THREE Risk Assessment
In addition to reservoirs with dams in Orange County, there are many water storage tanks that are
potentially susceptible to failure or damage by natural or manmade events. These water tanks contain
millions of gallons of water each and provide an important source of water storage. Their capacity is
large enough to cause substantial damage down slope from a tank should one fail. Correspondingly, the
history of failure of water storage tanks is considered.
Because dam failure can have severe consequences, FEMA and Cal OES require all dam owners to
develop Emergency Action Plans (EAP) for warning, evacuation, and post-flood actions. Although there
has been extensive coordination with County officials in the development of a County Response Plan, the
responsibility for developing potential flood inundation maps and facilitation of emergency response is
the responsibility of the dam owner.
3.2.4.2 History/Past Occurrences
Orange County has never experienced a major dam failure, but there have been two deadly incidents
involving dams built to supply water for the City of Los Angeles. In addition, the failure of a water tank
caused considerable damage within the City of Westminster in 1998. These three disasters are detailed
below.
ST.FRANCIS DAM,DISASTER OF 1928
In Los Angeles, the failure of the St. Francis Dam, and the resulting loss of over 500 lives was a scandal
that resulted in the almost complete destruction of the reputation of its builder, William Mulholland. It
was he who proposed, designed, and supervised the construction of the Los Angeles Aqueduct, which
brought water from the Owens Valley to the city. The St. Francis Dam, built in 1926, was 180 feet high
and 600 feet long. It was located near the City of Saugus in San Francisquito Canyon.
The dam failed on March 12, 1928 three minutes before midnight. Its waters swept through the Santa
Clara Valley toward the Pacific Ocean about 54 miles away. The valley was devastated before the water
finally made its way into the ocean between Oxnard and Ventura. At its peak the wall of water was said
to be 78 feet high. At the time the water flowed through Santa Paula, 42 miles south of the dam, the
water was estimated to be 25 feet deep. Almost everything in its path was destroyed: livestock,
structures, railways, bridges, and orchards. In the end Ventura County lay below 70 feet of mud and
damage estimates topped$20 million.
BALDWIN HILLS DAM,DISASTER OF 1963
The Baldwin Hills Dam collapse sent a 50-foot wall of water down Los Angeles' Cloverdale Avenue on
December 14, 1963. Five people were killed. Sixty-five hillside houses were ripped apart, and 210
homes and apartments were damaged. The flood swept northward in a V-shaped path roughly bounded
by La Brea Avenue,Jefferson Boulevard, and La Cienega Boulevard.
The earthen dam that created a 19-acre reservoir to supply drinking water to West Los Angeles residents
ruptured at 3:38 p.m. A pencil thin crack widened to a 75-foot gash allowing 292 million gallons to surge
out in 77 minutes. The cascade caused an unexpected ripple effect that is still being felt in Los Angeles
and beyond. It prompted the end of urban-area earthen dams as a major element of water storage systems,
and a tightening of the Division of Safety of Dams control over reservoirs throughout the state.
Final I August 2019 3-14
SECTION THREE Risk Assessment
WESTMINSTER WATER TANK FAILURE,DISASTER OF 1998
In September of 1998, a 5-million-gallon municipal water storage tank in the City of Westminster
ruptured because of corrosion and construction defects. There was no loss of life, but damage was
extensive. The flow of water from the 32-year-old tank destroyed most of the storage facility as well as
several private residences. Additionally, there were approximately 30 more homes inundated with water
and silt. Through the Public Works Mutual Aid Agreement, the Orange County Public Works
Department assisted the City of Westminster in the cleanup and temporary repair of the streets.
City employees,the Orange County Fire Authority,neighboring fire services, and the Red Cross were on-
site for days assessing the damage and assisting residents. Water storage for the City was non-existent
following this event while the other 5-million-gallon tank of similar age and construction was removed
from service as a precautionary measure.
A new reservoir facility came on-line in March 2003, consisting of two 8-million-gallon water storage
tanks, a 17-million-gallon-per-day booster station, and a new groundwater well with a capacity of 3,000
gallons per minute. All new construction has passed rigorous inspections and has obtained the required
permits from the California Department of Public Health.
3.2.4.3 Location/Geographic Extent
The following is a list of the larger reservoirs and dams in Orange County and their owners/operators:
Name of Facility Owner/Operator
Santiago Dam/Reservoir(Irvine Lake) Serrano Water District/Irvine Ranch Water District
Villa Park Dam County of Orange
Sulphur Creek Dam County of Orange
Peters Canyon Dam County of Orange
Walnut Canyon Dam/Reservoir City of Anaheim
San Joaquin Dam/Reservoir Irvine Ranch Water District
Sand Canyon Dam/Reservoir Irvine Ranch Water District
Rattlesnake Canyon Dam/Reservoir Irvine Ranch Water District
Big Canyon Dam/Reservoir City of Newport Beach
Lake Mission Viejo Lake Mission Viejo Association
El Toro R-6 Dam/Reservoir El Toro Water District
El Toro Reservoir/Rossmoor#1 Dam El Toro Water District
Diemer Filtration Plant Metropolitan Water District
Palisades Bradt Dam/Reservoir South Coast Water District
Portola Dam/Reservoir Santa Margarita Water District
Syphon Canyon Dam/Reservoir The Irvine Company
Trabuco Dam&Reservoir Trabuco Canyon Water District
Dove Canyon Dam Dove Canyon Master Association/
Trabuco Canyon Water District
Upper Oso Dam/Reservoir Santa Margarita Water District
Upper Chiquita Dam/Reservoir Santa Margarita Water District
Brea Dam U. S.Army Corps of Engineers
Fullerton Dam U. S.Army Corps of Engineers
Carbon Canyon Dam U. S. Army Corps of Engineers
Prado Dam U.S. Army Corps of Engineers
Final August 2019 3-15
SECTION THREE Risk Assessment
As mentioned above, the responsibility for developing maps showing areas that would be inundated in the
event of a failure is the responsibility of the dam's owner. Dams and reservoirs impacting the planning
area are summarized below:
Big Canyon Reservoir is a 600-acre foot potable water storage facility constructed in 1959 and owned by
the City of Newport Beach. It is in the San Joaquin Hills overlooking Newport Bay. Big Canyon
Reservoir is retained on three sides by a homogenous earth filled embankment dam, while the east side
was formed by a slope cut. At its maximum section the dam embankment is 65 feet high. The spillway is
an ungated concrete lined overflow structure located on the west side of the reservoir. The bottom of the
reservoir and the cut slopes are lined with minimum 5-foot-thick clay blanket, and the entire inside
surface, including the embankments and cut slopes, is overlain with a three-inch-thick porous asphalt
pavement. The reservoir is covered with a reinforced polypropylene weight-tensioned floating cover that
was installed in 2004.
Dove Canyon Dam is an earth-filled dam completed in 1990. The dam is in the Dove Canyon residential
community within the City of Rancho Santa Margarita, Orange County. The dam is owned by the Dove
Canyon Master Association (DCMA). DCMA owns and operates recreational facilities situated
immediately downstream of the dam crest on compacted backfill. The recreational facilities were
included in the construction documents for the Dam and approved by the State Division of Safety of
Dams. The impounded reservoir is located on land owned by Trabuco Canyon Water District (TCWD)
and is used to store up to about 415 acre-feet of runoff. TCWD and DCMA have an agreement to operate
and maintain the dam and reservoir. TCWD utilizes storage in the reservoir to supplement its recycled
water demands for landscape irrigation. The impounded water can be stored to an elevation of 1090 feet,
approximately 11 feet below the top of the dam crest's elevation of 1101 feet,MSL.
El Toro Reservoir/Rossmoor#1 Dam is an embankment type dam owned and operated by ETWD. The
reservoir is located in the City of Mission Viejo. The impounded reservoir has a storage capacity of 275
million gallons (850 acre-feet) with a surface area of approximately 20.6 acres. The bottom and internal
slopes of the reservoir are lined, and the reservoir surface has a floating cover. There is no surface water
influent to the reservoir. The reservoir includes an emergency spillway and drainage facilities. Storage
capacity in the El Toro Reservoir is owned through a regional partnership between ETWD, Santa
Margarita Water District and Moulton Niguel Water District.
Rossmoor #1 dam is an embankment type dam, with a height of 36 feet and a length of approximately
305 feet. The dam is located in the City of Laguna Woods. The impounded Holding Pond is used to
provide emergency storage of secondary effluent from the ETWD Water Recycling Plant and has a
storage capacity of 14 million gallons (43 acre-feet). The reservoir includes an emergency spillway and
drainage facilities.
Palisades Bradt Reservoir provides up to 48 million gallons of potable water storage with a 146-foot-
high, zoned, earthen embankment dam constructed in 1963. The bottom and internal slopes of the
reservoir are lined and the reservoir surface has a floating cover. The dam has a low-level outlet, an
emergency outlet, and an emergency spillway. The upstream watershed that contributes inflow to the
reservoir has an area of 19 acres.
Final I August 2019 3-16
SECTION THREE Risk Assessment
Peters Canyon Dam is an earth-filled structure owned by the County of Orange and has a capacity of
626 acre-feet at the spillway pipe elevation of 537 feet MSL. Water storage varies from 200 acre-feet to
600 acre-feet depending on seasonal rain amounts. Alerting would come primarily from the Park Ranger
at Peters Canyon Regional Park who would notify the Sheriff Department, Control One of dam failure or
possible dam failure.
Prado Dam is owned and operated by the Army Corps of Engineers and provides flood control and water
conservation storage for Orange, Riverside and San Bernardino counties. Prado Dam is a major
component of the Santa Ana Mainstem Project, which extends from the upper canyon in the San
Bernardino Mountains downstream to the Pacific Ocean at Newport Beach - some 75 miles along the
Santa Ana River. The entire system is designed to provide various levels of flood protection ranging from
100 to 190 years for areas most susceptible to damage from flooding.
Prado Dam collects upstream water releases from storage facilities and runoff from uncontrolled drainage
areas. It primarily benefits Orange County by reducing the potential for flood-induced damage and by
providing water conservation storage. Prado Dam has been undergoing major improvements including
raising the embankment and spillway; increasing the maximum discharge capacity, constructing new
levees and dikes, relocating and protecting utility lines, increasing reservoir area and increasing
impoundment.
Portola Dam is located near the northern end of Canada Gobernadora in southern Orange County; within
the Coto de Caza gated community. Canada Gobernadora flows north to south and confluences with San
Juan Creek approximately 7.5 miles upstream of the Pacific Ocean. Portola Dam is an earth-filled
structure situated about 8 miles north of San Juan Creek with a maximum recycled water (or domestic
water blend) storage capacity of 586 acre-feet and a high-water elevation of 936 feet.
The Canada Gobernadora valley channel area between the dam and San Juan Creek has been developed
with a golf course and lined on each side by thousands of homes positioned just at or above the 100-year
flood plain. If a dam break occurred, the flow would likely destroy streets crossing the flood plain,
damage the water, sewer and recycled water pipeline infrastructure in them and may also affect some or
many home locations near the stream channel. Streets in Coto de Caza certain to be affected are: Trigo
Trail, Via Pajaro, Via Conejo, Vista Del Verde, San Miguel, Cantamar and South Bend Road. Along
with the golf course and the equestrian center, additional District facilities that are anticipated to be
damaged or destroyed by a dam break in Coto de Caza and farther downstream are:
• Coto Lift Station and force main
• South Ranch lift station and force main
• South County pipeline
• Ortega Lift Station(Talega) force mains
• Talega recycled water transmission main
• Chiquita Land Outfall pipeline
Per the compliance report, after entering San Juan Creek, the dam break inundation flood area would be
about the same as the 100-year flood plain all the way down to the Pacific Ocean.
Santiago Dam is an earth fill dam with a 25,000 acre-feet capacity reservoir (Irvine Lake). The dam is
jointly owned by the Irvine Ranch Water District and the Serrano Water District. Villa Park Dam is a
flood control dam located downstream from Santiago Dam. It is an earth-fill structure with a capacity of
Final I August 2019 3-1
SECTION THREE Risk Assessment
15,600 acre-feet and is owned by the Orange County Flood Control District. Initial alerting is expected
from Dam keepers who are on duty at both Santiago Dam and Villa Park Dam.
Trabuco Dam is an earth-filled dam completed in 1984. The dam is located adjacent to the Robinson
Ranch residential community within the City of Rancho Santa Margarita, Orange County. The dam and
impounded reservoir is owned and operated by the Trabuco Canyon Water District (TCWD). TCWD
utilizes the reservoir to store up to approximately 135 acre-feet of reclaimed water produced from the
Robinson Ranch Wastewater Treatment Plant located adjacent to the reservoir. The reclaimed water can
be stored to an elevation of 1274 feet, approximately 6 feet below the top of the dam crest's elevation of
1280 feet,MSL.
Upper Oso Reservoir (UOR) and Dam are located within the Cities of Mission Viejo and Rancho Santa
Margarita near the northern end of the Oso Creek watershed in southern Orange County. Upper Oso Dam
is an earth-filled structure situated between El Toro Road and Los Alisos Boulevard nearly 10 miles north
of the Trabuco Creek confluence point. UOR has a high-water elevation of 953 feet and stores up to 4000
acre-feet of recycled water for landscape irrigation that is mainly used within Santa Margarita and
Moulton Niguel Water Districts.
Immediately downstream of the UOR dam, a long bridge for State Route 241 crosses the flood channel
and may not experience problems during a major flood event. Just upstream of Los Alisos Boulevard,
some commercial property lies adjacent to the Oso Creek channel and may be affected. About three miles
downstream on Oso Creek and upstream of Olympiad Road, a large basin area was created (now a sports
park)to capture and attenuate major discharges from UOR before they enter Lake Mission Viejo (LMV).
LMV is created by a dam lying under Alicia Parkway. A UOR dam breach may also overflow LMV and
damage the dam to point where it could release stored water and create a catastrophic flood hazard all the
way to the Pacific Ocean.
Downstream of LMV, two golf courses have been developed within the Oso Creek channel area and
numerous commercial properties are on adjacent sides. Housing tracts have been built above the 100-year
flood plain but if a dam break occurred, the flow from UOR and LMV would likely destroy streets
crossing the flood plain and damage the water, sewer and recycled water pipeline infrastructure in them.
In addition to the many pipelines crossing the flood plain, District facilities that are anticipated to be
damaged or destroyed by a UOR dam break are:
• Eastbrook RW Pump Station
• Lakeside Pump Station
• South County Pipeline
• Oso Creek Water Reclamation Plant
• Oso Creek Trunk Sewer
• Oso Barrier RW Pump Station and Pipelines
Due to proximity and elevation, a considerable number of the residential and commercial properties in
many areas close to the banks of Oso Creek and farther downstream would likely be flooded for short
period of time and damaged. Streets in Mission Viejo and farther south likely to be affected by a dam
failure are: Los Alisos Boulevard, Santa Margarita Parkway, Olympiad Road, Alicia Parkway, Jeronimo
Road, Marguerite Parkway, Casta del Sol, La Paz Road, Oso Parkway, Interstate 5, Camino Capistrano,
Del Obispo Street, Stonehill Drive and Pacific Coast Highway.
Final I August 2019 3-1 8
SECTION THREE Risk Assessment
Upper Chiquita Reservoir (UCR) — SMWD constructed the Upper Chiquita Reservoir to provide the
South Orange County region with substantial new water reserves to meet customer demand during
disruptions of water deliveries. These interruptions can be unanticipated, like the break of the Allen
McColloch Pipeline in 1999, or planned, like the shutdowns of the Diemer Filtration plant in Yorba Linda
to complete improvements or maintenance and repairs.
The Upper Chiquita Reservoir Emergency Storage Reservoir consists of an earthfill dam structure and a
covered, domestic water reservoir with a storage volume of 750 acre-feet. The reservoir footprint is
approximately 19.7 acres with a surface area of approximately 15.4 acres and has a High-Water Level
(HWL) of 860 feet.
In addition to the dam and reservoir,the site contains the following facilities:
• Floating Cover
• Access Roads
• Spillway and Drainage Facilities
• Inlet/Outlet Facilities and Pipelines
• Pump Station
• Disinfection Equipment
• Pipeline connection to the South Orange County Pipeline
The Upper Chiquita reservoir site is located on the western side of Chiquita Canyon north of Oso
Parkway and west of the current terminus of State Route 241 (SR-241) within the City of Rancho Santa
Margarita, east of the community of Las Flores in southern Orange County.
A portion of the site is encumbered within the Transportation Corridor Agency's (TCA) Chiquita Canyon
Perimeter Conservation Easement. The closest developed areas are the Tesoro High School campus
(located across Oso Parkway and south of the reservoir site) and the residential community of Las Flores
(approximately 0.8-mile west of the site). Additional land uses in the proximity to the reservoir site
include a neighborhood park, Crestview Park, located just over 300 feet west of the site, and the SMWD
Las Flores Reservoir, located approximately 250 feet west of the site.
Under an extreme catastrophic dam failure scenario, the flood zone would exceed the FEMA 100-year
floodplain in the Canada Chiquita Channel. Under this extreme scenario, land use categories that would
be affected include the Oso Parkway, SR-241 and the Tesoro High School. Once the flood waters reach
the San Juan Creek the flood flows would be less than the FEMA 100-year flood.
The Upper Chiquita Reservoir is located on the western slope of Chiquita Canyon, just north of Oso
Parkway in the City of Rancho Santa Margarita. Completed in October 2011, the 244 million-gallon
Upper Chiquita Reservoir is the largest domestic water reservoir built in south Orange County in nearly
45 years. Information regarding UCR:
• Storage capacity of approximately 244 million gallons of domestic water (750 acre-feet) is
contained in a lined and covered reservoir.
• Surface area of approximately 17.8 acres.
• A regional partnership between SMWD (lead agency), Moulton Niguel Water District, City of
San Juan Capistrano,City of San Clemente and South Coast Water District(storage owners).
Final I August 2019 3-19
SECTION THREE Risk Assessment
• Capable of providing upwards of 168,000 families with approximately 200 gallons of fresh water
a day for one week.
• Included in the South Orange County Natural Community Conservation Plan, which designates
habitat conservation and species protection measures to ensure an environmentally sensitive
design.
• Reservoir is not visible from homes in local neighborhoods, including Las Flores and Wagon
Wheel.
• Earthen embankment significantly reduces any visual impacts while traveling west along Oso
Parkway near Highway 241.
• Reservoir design conforms to the rigorous standards set forth by the State of California.
• Safety features, including piezometers (moisture sensors),to continually monitor water levels and
test for irregularities.
3.2.4.4 Magnitude/Severity
Orange County's reservoirs range in capacity from 18 to 196,235 acre-feet of water storage. Inundation
maps and studies, when available, indicate the area that would be flooded and can be used to gauge the
severity of a dam failure.
A compliance analysis and inundation study report was prepared for Upper Oso Dam in 1979 to allow for
construction permitting by the State of California. This study indicated that if the dam was breached, a
potential maximum flow rate exceeding 250,000 cubic feet per second may be expected when the water
surface elevation drops to about 935 feet. Should such an event occur, the Upper Oso Reservoir could
potentially empty in about a half hour.
A similar report for Portola Dam was done in 1980. This study indicated that if the dam was breached, a
potential maximum flow rate of 22,645 cubic feet per second may be expected after about three hours
once the water surface elevation is at elevation 920 feet. Should such an event occur, Portola Dam would
potentially empty in just over six hours.
Failure of a reservoir or a dam could extend throughout most of the planning area, depending upon the
size of the facility and associated failure.
3.2.4.5 Probability of Future Occurrences
There has been just one incident involving a water storage structure in the 110 years since construction of
the first contemporary dam in Orange County. It is expected that future events will remain highly
unlikely, with a less than 1 percent chance of happening in any given year. However, such occurrences
have the potential to be highly destructive.
In the more than 50 years since the collapse of the Baldwin Hills Dam,there have been very few incidents
in California due to stringent standards, regulations, and regular inspections. The near-catastrophic
failure of the main spillway of the Oroville Dam in Northern California in 2017 is a reminder of the
ongoing risk presented by dams.
Final I August 2019 3-20
SECTION THREE Risk Assessment
3.2.5 Drought
3.2.5.1 Description (Nature) of the Hazard
Many governmental utilities, the National Oceanic and Atmospheric Administration (NOAA) and the
California Department of Water Resources, as well as academic institutions, such as the University of
Nebraska-Lincoln's National Drought Mitigation Center, generally agree that there is no clear definition
of drought. Drought is highly variable depending on one's location within a state,the country or globe.
Drought in its simplest definition is an extremely dry climatic period where the available water falls
below a statistical average for a region. Drought is also defined by factors other than rainfall, including
vegetation conditions,agricultural productivity, soil moisture,water levels in reservoirs, and stream flow.
In effect,there are essentially three forms of drought: meteorological or hydrological drought, agricultural
drought, and regulatory drought:
• A meteorological or hydrological drought is typically defined when there is a prolonged period of
less than average precipitation resulting in the water level in aquifers, lakes, or above ground
storage reservoirs falling below sustainable levels.
• An agricultural drought occurs when there is insufficient moisture for an average crop yield.
Agricultural drought can be caused by the overuse of groundwater, poor management of
cultivated fields,as well as lack of precipitation.
• A regulatory drought can occur when the availability of water is reduced due to imposition of
regulatory restrictions on the diversion and export of water out of a watershed to another area. A
significant percentage of water in Southern California is imported from other regions (Colorado
River and Northern California) via aqueducts. Correspondingly, drought in California can be
made worse by water availability conditions in the regions at which the water originates.
An example of regulatory drought occurred between 1999 and 2004; a six-year drought on the
Colorado River basin, a major water supply for Southern California, resulted in a draw-down of
Colorado River water storage by more than 50%. More recently, beginning in 2008, regulatory
restriction in exporting water via the State Water Project combined with unusually dry weather
patterns resulted in two years of water rationing in Southern California. Additionally, a
meteorological drought can lead to regulatory restrictions; for example, California experienced
prolonged drought from 2013 to 2017, resulting in mandatory water restrictions for residents
through November 25,2017.
Even distant droughts may have consequences for the plan area and participating jurisdictions.
The great drought of the 1930s, coined the "Dust Bowl," was geographically centered in the
Great Plains yet ultimately affected water shortages in California. The drought conditions in the
plains resulted in a large influx of people to the west coast. Approximately 350,000 people from
Arkansas and Oklahoma immigrated mainly to the Great Valley of California. As more people
moved into California, including Orange County, increases in intensive agriculture led to overuse
of the Santa Ana River watershed and groundwater resulting in regional water shortages.
Droughts cause public health and safety impacts, as well as economic and environmental impacts. Public
health and safety impacts are primarily associated with catastrophic wildfire risks and drinking water
shortage risks for small water systems in rural areas and private residential wells. Examples of other
impacts include costs to homeowners due to loss of residential landscaping, degradation of urban
Final I August 2019 3-21
SECTION THREE Risk Assessment
environments due to loss of landscaping, agricultural land fallowing and associated job loss, degradation
of fishery habitat, and tree mortality with damage to forest ecosystems. Drought conditions can also result
in damage to older infrastructure that is located within dry soils with potential to leak or break. Dead or
dying vegetation poses a risk to falling and damaging water and wastewater infrastructure systems.
In Orange County, drought conditions typically result in implementation of large-scale conservation
efforts,reducing water supplies to customers and altering the pricing system by implementing higher rates
for water usage that exceeds certain levels (e.g., wasteful). Higher rates that may be imposed during a
drought could have disproportionate impacts on lower-income households. Reduction in groundwater
supplies during drought conditions can also result in the need for water agencies that have high reliance
on local groundwater supplies to purchase larger amounts of imported water. Drought conditions have
also resulted in drier brush and an increase in the size and severity of wildfires. Water and wastewater
infrastructure systems located within areas susceptible to wildfires are at a greater risk of being impacted.
Damage or failure to water and wastewater infrastructure systems can significantly reduce or even
interrupt service to customers. For more on wildfire hazards, see Section 3.2.12. In addition, climate
change (see Section 3.2.1)may lead to more frequent and persistent droughts in the future.
Several bills have been introduced into Congress to mitigate the effects of drought. In 1998, President
Clinton signed into law the National Drought Policy Act, which called for the development of a national
drought policy or framework that integrates actions and responsibilities among all levels of government.
In addition, it established the National Drought Policy Commission to provide advice and
recommendations on the creation of an integrated federal policy. The most recent bill introduced into
Congress was the National Drought Preparedness Act of 2003, which established a comprehensive
national drought policy and statutorily authorized a lead federal utility for drought assistance. Currently
there exists only an ad-hoc response approach to drought unlike other disasters (e.g., hurricanes, floods,
and tornadoes)which are under the purview of FEMA.
3.2.5.2 History/Past Occurrences
Based on years of recorded water trends in Southern California, it is quite apparent that droughts and
water shortages can occur. Paleo records indicate that much more extreme events can occur than those
since historical record-keeping began. A significant drought, reported by many of the ranchers in
Southern California, occurred in 1860.
The National Drought Mitigation Center maintains a Drought Risk Atlas with historic data on drought
classifications throughout the United States. Based on the Palmer Drought Severity Index (PDSI), there
have been six occasions since records began in 1920 when the monitoring station in the City of Santa Ana
recorded "severe" or "extreme" drought conditions for a period of at least 12 months. These periods,
based on a"self-calibrating"PDSI,which uses data adjusted to be more sensitive to the local climate, are
listed in Table 3-4, Severe and Extreme SC-PDSI Drought Periods 1920-2012 Lasting 12 Months or
Longer(Santa Ana. CA).16
16 NDMC. U.S.Drought Risk Atlas. http://droughtatlas.unl.edu/Data.aspx. Accessed March 2018.
Final I August 2019 3-2
SECTION THREE Risk Assessment
Table 3-4
Severe and Extreme SC-PDSI Drought Periods 1920-2012
Lasting 12 Months or Longer(Santa Ana,CA)
Drought Start Drought End Duration(Months)
February 1961 September 1963 31
March 1971 January 1978 82
May 1984 December 1992 103
January 1994 January 1995 12
December 1999 October 2004 58
January 2006 October 2010 57
The certified Drought Risk Atlas data does not yet include the historic, statewide drought that California
experienced within the last five years. Governor Jerry Brown proclaimed a State of Emergency in
January 2014; the declaration was not lifted until April 2017. In Orange County,precipitation totals were
well below average for five 12-month periods in a row. From July 2013 to June 2014,the weather station
in Santa Ana recorded just 4.4 inches or rain, about one-third of the normal annual amount.17
3.2.5.3 Location/Geographic Extent
Droughts occur over large regions and thus can affect the entire planning area.
3.2.5.4 Magnitude/Severity
Of the many varied indexes used to measure drought, the Palmer Drought Severity Index (PDSI) is the
most commonly used in the United States. Developed by meteorologist Wayne Palmer, the PDSI is used
to measure dryness based on recent temperature compared to the amount of precipitation. It utilizes a
number range, where 0 indicates normal conditions, negative numbers indicate drought, and positive
numbers indicate wet spells;refer to Table 3-5,Palmer Drought Severity Index.
Table 3-5
Palmer Drought Severity Index
Drought Wet Spells
-4.0 or less(Extreme Drought) +2.0 or+2.9(Unusual Moist Spell)
-3.0 or-3.9(Severe Drought) +3.0 or+3.9(Very Moist Spell)
-2.0 or-2.9(Moderate Drought) +4.0 or above(Extremely Moist)
-1.9 to+1.9(Near Normal)
The PDSI is very effective at evaluation trends in the severity and frequency of prolonged periods of
drought, and conversely wet weather. NOAA publish weekly PDSI maps, which are also used by other
scientists to analyze the long-term trends associated with global warming and how this has affected
11 Orange County Public Works. Historic Rainfall Data. http://www.ocwatersheds.com/rainrecords/rainfalldata/
historic data.
Final I August 2019 3-23
SECTION THREE Risk Assessment
drought conditions. Figure 3-1 shows the current NOAA PDSI map for the week ending on March 17,
2018.
Figure 3-1
March 17,2018 PDSI
Drought Severity Index by Division
Weekly Value for Period Ending Mar 17, 2018
Long Term Palmer
i
)
e
DROUGHT SEVERITY INDEX(PALMER)
DEPICTS PROLONGED(MONTHS,YEARS)ABNORMAL DRYNESS OR
WETNESS:REPONDS SLOWLY;CHANGES LITTLE FROM WEEK TO WEEK;
AND REFLECTS LONG-TERM MOISTURE RUNOFF,RECHARGE,AND DEEP Based on preliminary data
PERCOLATION AS WELL AS EVAPOTRANSPIRATION. p
F
USES...APPLICABLE IN MEASURING DISRUPTIVE EFFECTS OF PROLONGED DRYNESS �a�
OR WETNESS ON WATER SENSITIVE ECONOMIES,DESIGNING DISASTER AREAS OF DROUGHT
OR WETNESS;AND REFLECTING THE GENERAL LONG-TERM STATUS OF WATER SUPPLIES
IN AQUIFERS,RESERVOIRS AND STREAMS.
E-4.0 or less(Extreme Drought) +2.0 to+2.9(Unusual Moist Spell)
LIMITATIONS...IS NOT GENERALLY INDICATIVE OFFSHORT-TERM(FEW WEEKS)STATUS -3.0 to-3.9(Severe Drought) +3.0 to+3.9(Very Moist Spell)
OF DROUGHT OR WETNESS SUCH AS FREQUENTLY AFFECTS CROPS AND FIELD OPERATIONS
(THIS 15INDICATED BY THE CROP MOISTURE INDEX). -2.0 to-2.9(Moderate Drought) 0+4.0 and above(Extremely Moist)
--1.9 to+1.9(Near Normal) Missing/Incomplete
In 2014, at the peak of the statewide drought, the index assigned the extreme drought category to the
southern coastal California climate division for 40 consecutive weeks. Figure shows the NOAA
PDSI for the week ending on July 26,2014.
Final I August 2019 3-24
SECTION THREE Risk Assessment
Figure 3-2
July 26,2014 PDSI
Drought Severity Index by Division
Weekly Value for Period Ending JUL 26, 2014
Long Term Palmer
_<1
I
r
i
I
❑-4.0 or less (Extreme Drought) Climate Prediction Center, NOAA 1>
❑-3.0 to -3.9 (Severe Drought) ❑ +2.0 to +2.9 (Unusual Moist Spell)
❑-2.0 to -2.9 (Moderate Drought) +3.0 to +3.9 (Very Moist Spell)
n-1.9 to +1.9 (Near Normal) +4.0 and above (Extremely Moist)
The average duration of the droughts listed in Table 3-4, which includes drought periods classified as
severe or extreme, is 57 months.
3.2.5.5 Probability of Future Occurrences
The University of Nebraska-Lincoln has published PDSI maps analyzing trends over the past 100 years
(National Drought Mitigation Center 2005; Figure 1). In coastal southern California, from 1895 to 1995,
severe droughts occurred 10 to 15 percent of the time. From 1990 to 1995, severe droughts occurred 10
to 20 percent of the time.
Based on the droughts listed in Table 3-4, Orange County has been in severe or extreme drought for a
total of 343 months, or 31 percent of the time since 1920 and 54 percent of the time since 1960 (Note:
these calculations do not include the historic drought that officially ended in 2017).
Final I August 2019 3-25
SECTION THREE Risk Assessment
3.2.6 Earthquake Fault Rupture &Seismic Hazards (Ground Shaking & Liquefaction)
3.2.6.1 Description (Nature) of the Hazard
Earthquakes are considered a major threat to the County, especially when focusing on water and
wastewater facilities and pipelines that run throughout the County. A significant earthquake along one of
the major faults could cause substantial casualties, extensive damage to infrastructure, fires, and other
threats to life and property. Significant damages and outages of water and wastewater facilities could also
occur. The effects could be aggravated by aftershocks and by secondary effects such as fire, landslides
and dam failure. A major earthquake could be catastrophic in its effects on the population and could
exceed the response capability of the local communities and even the State.
Following major earthquakes, extensive search and rescue operations may be required to assist trapped or
injured persons. Emergency medical care, food/water and temporary shelter would be required for
injured or displaced persons. In the event of a truly catastrophic earthquake, identification and burial of
the dead would pose difficult problems. Mass evacuation may be essential to save lives. Emergency
operations could be seriously hampered by the loss of communications, damage to transportation routes
within,to, and out of the disaster area, and by the disruption of public utilities and services. With damage
to critical water and wastewater infrastructure there will be significant public health concerns, such as
dehydration or exposure to contaminated water, and the potential for reduced fire protection due to
limited sources of water. Facilities at greatest risk from severe earthquakes are dams and pipelines.
Additionally, damage to water and sewer lines that service commercial and industrial areas could have a
significant impact on the economy of the region. Extensive mutual aid for an extended period may be
required to bring water and wastewater services back online.
Earthquakes strike with little to no warning and they can have multiple impacts on an area. After effects
from an earthquake may include impacted roadways, downed power and communication lines, fires, and
damages to structures (especially poorly built, or those already in disrepair). Should a major event occur,
major damages and losses should be expected to pumping systems and wastewater treatment
infrastructure. Earthquakes are not a seasonal hazard, and thus can be experienced year-round. This fact
presents its own set of planning and preparedness concerns.
Seismic-specific building codes can provide MAs with reasonable guidance for structural mitigation. As
maintenance and potentially new building occurs within the planning area, seismic retrofitting is highly
recommended to prevent extensive damage to essential infrastructure.
For decades,partnerships have flourished between the United State Geological Survey(USGS), Cal Tech,
the California Geological Survey (CGS) and California universities to share research and educational
efforts with Californians. Tremendous earthquake mapping and mitigation efforts have been made in
California in the past two decades, and public awareness has risen remarkably during this time. Major
federal, state, and local government utilities and private organizations support earthquake risk reduction.
These partners have made significant contributions in reducing the adverse impacts of earthquakes.
Final I August 2019 3-26
SECTION THREE Risk Assessment
LIQUEFACTION
Liquefaction is the phenomenon that occurs when ground shaking causes groundwater to mix with the
soil. The mixture temporarily becomes a fluid and loses its strength. Liquefaction causes two types of
ground failure: lateral spread and loss of bearing strength. Lateral spreads develop on gentle slopes and
entails the sidelong movement of large masses of soil as an underlying layer liquefies. Loss of bearing
strength results when the soil supporting structures liquefies and causes structures to settle and/or collapse
from weakened foundations. Liquefaction can also occur independently of an earthquake, if any sudden
and significant stress causes the mixing of groundwater and soil. The risk of liquefaction depends on
several factors,including the height of the groundwater table and the types of soil in the area.
3.2.6.2 History/Past Occurrences
Southern California and Orange County have experienced several powerful earthquakes. The earliest
recorded earthquake in California occurred in Orange County in 1769. To better understand the potential
for damaging earthquakes in southern California,the scientific community has reviewed historical records
and conducted extensive research on faults that are the sources of the earthquakes occurring in southern
California. Historical earthquake records can generally be divided into records of the pre-instrumental
period and the instrumental period. In the absence of instrumentation,historic records of past earthquakes
are based on observations and the level of information is often dependent upon population density in the
area of the earthquake. Since California was sparsely populated in the 1800s, detailed information on pre-
instrumental earthquakes is relatively sparse. However, two very large earthquakes, the Fort Tejon in
1857 (M 7.9) and the Owens Valley in 1872 (M 7.6)are evidence of the tremendously damaging potential
of earthquakes in southern California. Other notable earthquakes that have impacted southern California
include the 1910 Glen Ivy Hot Springs earthquake (Elsinore Fault Zone, M 6.0), the 1933 Long Beach
earthquake (Newport-Inglewood Fault Zone, M 6.4), the 1952 Kern County and Lander earthquakes (M
7.3), the 1971 San Fernando earthquake (San Fernando Fault Zone, M 6.6),the 1987 Whittier earthquake
(Whittier Fault Zone, M 5.9), and the 1994 Northridge earthquake (Pico Thrust, M 6.7). The 1987
Whittier Quake caused damage to the Puente Hills Reservoir in La Habra and after inspection the
reservoir was found to have cracks in the concrete lining.
Damage from some of these earthquakes was limited because they occurred in areas which were sparsely
populated at the time they occurred. However, developed areas were much more severely affected.
Damage from the 1933 Long Beach earthquake was estimated at more than $40 million ($889 million in
2018 dollars), and 115 lives were lost. The seismic risk is much more severe today than in the past
because the population at risk is in the millions, rather than a few hundred or a few thousand persons.
Earthquakes of great magnitudes have caused lasting effects in developed regions.
The most recent significant earthquake event affecting southern California was the 1994 Northridge
Earthquake. At 4:31 A.M. on Monday, January 17, a moderate, but very damaging earthquake with a
magnitude of 6.7 struck the San Fernando Valley. In the following days and weeks, thousands of
aftershocks occurred, causing additional damage to affected structures. In this earthquake, 57 people
were killed and more than 1,500 people seriously injured. For days afterward, thousands of homes and
businesses were without electricity,tens of thousands had no gas, and nearly 50,000 had little or no water.
Out of the approximately 66,000 structures inspected, approximately 15,000 structures were moderately
to severely damaged,which left thousands of people temporarily homeless. Several collapsed bridges and
overpasses created commuter havoc on the freeway system. Extensive damage was caused by ground
shaking, but earthquake triggered liquefaction, and dozens of fires also caused additional severe damage.
The extremely strong ground motion felt in sizable portions of Los Angeles County resulted in record
Final I August 2019 3-2
SECTION THREE Risk Assessment
economic losses. The fact that the earthquake occurred early in the morning on a holiday considerably
reduced the potential effects. Many collapsed buildings were unoccupied, and most businesses were not
yet open. The direct and indirect economic losses ran into the tens of billions of dollars.
Clearly, no community in southern California is beyond the reach of a damaging earthquake. The
historical earthquake events that have affected southern California are listed below in Table 3-6,
Magnitude 5.0 or Greater Earthquakes in the Southern California Region.
Table 3-6
Magnitude 5.0 or Greater Earthquakes in the Southern California Region
Date I Location 1 Magnitude
1769 Los Angeles Basin (M 6.0) 1941 Carpentaria(M 5.9)
1800 San Diego Region(M 6.5) 1952 Kern County(M 7.7)
1812 Wrightwood(M 7.0) 1954 West of Wheeler Ridge(M 5.9)
1812 Santa Barbara Channel(M 7.0) 1971 San Fernando(M 6.5)
1827 Los Angeles Region(M 5.5) 1973 Point Mugu(M 5.2)
1855 Los Angeles Region(M 6.0) 1979 Imperial Valley(6.5)
1857 Great Fort Tejon Earthquake(M 8.3) 1986 North Palm Springs(M 6.0)
1858 San Bernardino Region(M 6.0) 1987 Whittier Narrows(M 5.8)
1862 San Diego Region(M 6.0) 1990 Upland(M 5.7)
1892 San Jacinto or Elsinore Fault(M 6.5) 1991 Sierra Madre(M 5.6)
1893 Pico Canyon(M 5.8) 1992 Landers(M 7.3)
1894 Lytle Creek Region(M 6.0) 1992 Big Bear(M 6.2)
1894 E.of San Diego(M 5.8) 1994 Northridge(M 6.7)
1899 Lytle Creek Region(M 5.8) 1999 Hector Mine(M 7.1)
1899 San Jacinto and Hemet(M 6.4) 2004 San Luis Obispo(M unknown)
1907 San Bernardino Region(M 5.3) 2008 Greater Los Angeles Area(M 5.5)
1910 Glen Ivy Hot Springs(M 5.5) 2008 Borrego Springs(M 5.4)
1916 Tejon Pass Region(M 5.3) 2009 El Centro/Baja,Ca(M 5.9)
1918 San Jacinto(M 6.9) 2010 El Centro/Baja,Ca(M 7.2)
1923 San Bernardino Region(M 6.0) 2010 El Centro/Baja,Ca(M 5.7)
1925 Santa Barbara(M 6.3) 2014 La Habra(5.1)
1933 Long Beach(M 6.3)
Final I August 2019 3-28
SECTION THREE Risk Assessment
LIQUEFACTION
Comprehensive, historic accounts of damage to structures from liquefaction are not readily available.
Some damage caused by the Northridge earthquake of 1994, such as damage to the King Harbor area of
Redondo Beach in Los Angeles County,was due to liquefaction, as opposed to ground shaking.
3.2.6.3 Location/Geographic Extent
Nearly all of Orange County is at risk of moderate to extreme ground shaking. Figure 3-3 shows ground
shaking severity zones for Orange County. The areas most susceptible to damage from earthquakes based
on the shaking intensity hazard map include Yorba Linda Water District and the Cities of La Habra and
Buena Park. These communities can be severely impacted by landslides, liquefaction, extensive
infrastructure damage, fire, dam failure, and other secondary earthquake affects. A major earthquake
could be catastrophic in its effect on the population and could exceed the response capability of the local
communities and even the State. Although the above noted water/wastewater utilities are most likely to
experience "extreme" shaking, all of the County's water/wastewater utilities fall within a moderate to
extreme shaking intensity zone and therefore should expect the potential of damage from an earthquake.
The area at risk of fault rupture is limited to areas in the immediate vicinity of a fault. California began
extensive mapping of earthquake faults with the Alquist-Priolo Earthquake Fault Zoning Act of 1972.
Figure shows both the fault zones in Orange County that have been mapped through the act. The
Whittier Fault Zone near the county's northern border passes through part of the Yorba Linda Water
District. The Newport-Inglewood Fault Zone parallels the coast in western Orange County.
There are many additional large faults that could affect Orange County in addition to the Whittier and
Newport-Inglewood-Rose Canyon faults. These include the Elsinore Fault, Peralta Fault, Puente Hills
Fault, San Andreas Fault, and San Jacinto Fault. Smaller faults include the Norwalk Fault and the El
Modena Faults. In addition, newly studied thrust faults, such as the San Joaquin Hills Fault could also
have a significant impact on the County. Each of the major fault systems are described briefly below and
are presented in alphabetical order. This order does not place more danger on one fault over another; it is
simply for organizational purposes.
• Elsinore Fault Zone/ Whittier Fault/Chino Fault: Located in the northeast part of the county,
the Elsinore Fault Zone follows a general line easterly of the Santa Ana Mountains into Mexico.
The main trace of the fault zone is about 112 miles long. The last major earthquake on this fault
occurred in 1910 (M 6.0), and the interval between major ruptures is estimated to be about 250
years. Southern California Earthquake Center (SCEC) reports probable earthquake magnitudes
for the main trace of the Elsinore fault to be in the range of 6.5 to 7.5. At the northern end of the
Elsinore Fault zone, the fault splits into two segments: the 25-mile-long Whittier Fault (probable
magnitudes between 6.0 and 7.2), and the 25-mile-long Chino Fault (probable magnitudes
between 6.0 and 7.0). The location of the Whittier Fault makes it especially critical to the Diemer
Filtration Plant in Yorba Linda and pipelines bringing water into Orange County and/or from the
Diemer Plant which is located very near this fault.
Final August 2019 3-29
SECTION THREE Risk Assessment
Figure 3-3
Ground Shaking Hazard
San Bernardino
County
Los Angeles
County
Riverside County
\ /
Water Districts Infrastructure
• Reservoirs 4
,w
MET Diemer Filtration Plant
Water Treatment Plant
Wastewater Treatment Plant
Potable Local I
MET/Joint Agency Pipe Lines Ground Shaking J °�°' San Diego County
Local Sewer Lines Susceptability
Regional Sewer Lines
-Outfall Lines Moderate N
W�E
-Force Mains � High
Water Agency Boundary Extreme oi 2;1 51 to
\
Miles
ORANGE COUNTY
POTABLE AND WASTEWATER INFRASTRUCTURE
Final I August 2019 3-30
SECTION THREE Risk Assessment
Figure 3-4
Alquist-Priolo Rupture Zones
San Bernardino
County
Los Angeles orervgeC°um fteaer'/i�{
County _
-
0. r '
uCf Lr1 s• �'' —� Riverside County
. 1
oa.rvts
`!
own
1-
C�
vas re:� I—_._.. _ •�^
wn�rn
Water Districts Infrastructure
f..
• Reservoirs `' w,_
Hescry
� MET Diemer Filtration Plant sa � s •� fs
Water Treatment Plant ~
—•_.
ftc
Wastewater Treatment Plant
Potable Local \?� ,
MET/Joint Agency Pipe Lines s ,e
�r San Diego County
—Local Sewer Lines °
Regional Sewer Lines Earthquake N
Outfall Lines Hazard
--- Force Mains w+e
Alquist-Priolo Rupture s
O Water Agency Boundary Zone o 2.5 s 10
Miles
�\
ORANGE COUNTY
POTABLE AND WASTEWATER INFRASTRUCTURE
Final I August 2019 3-31
SECTION THREE Risk Assessment
• Newport-Inglewood-Rose Canyon Fault Zone: This fault zone extends from the Santa Monica
Mountains in a southeast direction through the western part of Orange County, then continues
offshore (not more than four miles from the coast) down to San Diego Bay. Originally, this was
thought to have been two separate systems; the Newport-Inglewood Fault and the Rose Canyon
Fault Line. However, a study prepared in March 2017 found that they are in fact one continuous
fault line with three main stepovers. This fault line was the source of the destructive 1933 Long
Beach earthquake (magnitude 6.4), which caused 120 deaths and considerable property damage.
SCEC reports probable earthquake magnitudes for the Newport-Inglewood fault to be in the
range of 6.0 to 7.4.
• Peralta Hills Fault: Limited information is available to paleoseismically characterize the fault
and no studies have been undertaken to determine the timing of earthquakes. There is a strong
geomorphic expression along Lincoln Boulevard west of Tustin Avenue in the City of Orange.
Some believe the fault is not active while others believe it is active. On-going research has linked
the fault as a back thrust with the Elsinore Fault,with a potential magnitude of 6.8.
• Puente Hills Thrust Fault: This is another recently discovered blind thrust fault that runs from
northern Orange County to downtown Los Angeles. It is now known to be the source of the 1987
Whittier Narrows earthquake. Recent studies indicate that this fault has experienced four major
earthquakes ranging in magnitude from 7.2 to 7.5 in the past 11,000 years,but that the recurrence
interval for these large events is on the order of several thousand years.
• San Andreas Fault Zone: As the dominant active fault in California, it is the main element of the
boundary between the Pacific and North American tectonic plates. The longest and most
publicized fault in California, it extends approximately 650 miles from Cape Mendocino in
northern California to east of San Bernardino in southern California and is approximately 35
miles northeast of Orange County. This fault was the source of the 1906 San Francisco
earthquake, which resulted in some 700 deaths and millions of dollars in damage. It is the
southern section of this fault that is currently of greatest concern to the scientific community.
Geologists can demonstrate that at least eight major earthquakes (Richter Magnitude 7.0 and
larger) have occurred along the southern San Andreas Fault in the past 1,200 years with an
average spacing in time of 140 years, plus or minus 30 years. The last such event occurred in
1857 (Fort Tejon earthquake). Based on that evidence and other geophysical observations, the
Working Group on California Earthquake Probabilities (SCEC, 1995) has estimated the
probability of a similar rupture (M 7.8) in the next 30 years (1994 through 2024) to be about 50
percent. The range of probable magnitudes on the San Andreas Fault Zone is reported to be 6.8
to 8.0.
• San Jacinto Fault Zone: The San Jacinto fault zone is located approximately 30 miles north and
east of the county. The interval between ruptures on this 130-mile-long fault zone has been
estimated by SCEC to be between 100 and 300 years,per segment. The most recent event (1968
M6.5) occurred on the southern half of the Coyote Creek segment. SCEC reports probable
earthquake magnitudes for the San Jacinto fault zone to be in the range of 6.5 to 7.5.
• San Joaquin Hills Fault: This fault is a recently discovered southwest-dipping blind thrust fault
originating near the southern end of the Newport-Inglewood Fault close to Huntington Beach, at
the western margins of the San Joaquin Hills. Rupture of the entire area of this blind thrust fault
could generate an earthquake as large as magnitude 7.3. In addition, a minimum average
Final August 2019 3-32
SECTION THREE Risk Assessment
recurrence interval of between about 1650 and 3100 years has been estimated for moderate-sized
earthquakes on this fault(Grant and others, 1999).
In addition to the major faults described above, the rupture of several smaller faults could potentially
impact Orange County, including the Norwalk Fault (located in the north of the county in the Fullerton
area) and the El Modeno Fault(located in the City of Orange area).
In 2005, MWDOC hired Earth Consultants International to prepare specific ground acceleration and
shaking maps for five fault earthquake scenarios in Orange County. Table 3-7, Characteristics of
Important Geologic Faults in Orange County, summarizes the characteristics of these five major geologic
faults. Earthquake maps for the individual jurisdictions are included in the Jurisdictional Annexes.
Table 3-7
Characteristics of Important Geologic Faults in Orange County
Newport-
Characteristic Inglewood- Peralta Hills Puente Hills San Joaquin Whittier
Rose Canyon Hills
(onshore)
Fault Type Strike-slip Thrust Blind thrust Blind thrust Strike-slip
Slip Rate mm/ r 1 +/-0.5 Unknown, Prob.<1 0.7+/-0.4 0.5+/-0.2 2.5+/-1.0
Magnitude' 6.9 6.8 7.5 6.6 6.8
Recurrence Interval ears 2,200-3,900 Unknown 2,750 1,600-3,100 1,100
Last Activityears ago) M6.3 in 1933 Unknown <3,000 200-300 1,600-2,000
1 The magnitude shown represents the fault's average behavior. Reference: "Five Earthquake Scenarios Ground Motion Maps for Northern
Orange County"prepared for Municipal Water District of Orange County by Earth Consultants International,July 22,2005.
Figure ,prepared for the California Domestic Water Corp., a private wholesaler, shows the location of
earthquake epicenters from 1941 to 2013 in and around Orange County, which is outlined in the center of
the map.
Earthquakes that occur outside of southern California and Orange County could also have a significant
impact on drinking water supplies. Such scenarios include disruptions of the Colorado River Aqueduct,
the State Water Project (especially at an area such as the Edmonston Pumping Station and Porter Tunnel
bringing water over and through the Tehachapi), and in the Bay-Delta Region,where failure of levees and
flooding of islands with salt water from San Francisco Bay could disrupt water supplies for months or
years. Orange County is 50 percent dependent on supplies from beyond its borders to meet the drinking
water needs. This leaves it exposed to these occurrences from outside the region.
Final I August 2019 3-33
SECTION THREE Risk Assessment
Figure 3-5
Location of Earthquake Faults Bounding the CDWC Service Area and Orange County
WEE = = • ,; ,;.-� r
CtErifORN
• OO ` ail•. '7,' _ ' ti0 - (tp +G V CRNAK O►%VON/4
"Ito.
00
OOD n'� ♦ RAYNONO ZONE Mk'. O�� •.*
A � � �Gy'� DOSE ! t• °1(`O = �.
• .ZmS CREEP 1 , • ,NP aJ ATM cF ' •'r\�• (f�••
• .• •' }'c .i•. V lM • s°�
oe
p a C
' • pp .• LD EAR.• • � • � .-��,i'.�•��,,
LFRp� • 1,i,. ; • 1S y1 t
�• +o(T t1
Orange County Feeders• es and Wells !t - 'r0 7✓ -
aro black plotted in black.
Sec Plate 1 for further details .�+p 1 • � _ �U�h r (�, L(
•M.. •. 1 -C• .j'/- 1• „� _' _. .I CREEP JJ
Mauksson el al.2013 EaAhquake Catalog -
fN..7.o • 4e.N..so•Y..a.o • • • ' r /. I ••
r 30.N.•do so.N..eo R
,141 •
R Fa ram t.
��FM wO�rrb.c irM 1'00 xr♦i Q•prpnM / 7//•.��y��/� � l,�
�F.,e•a n•rrrr vw 11,1(q F•r•)D•pl•t•nr• •• � _ 1* ,/J�/ x'I 1
3 FM+Oi lY O-M—y(F••700 000 F•nF)D-•rc• , 1" r /j r.JL yl
�F.1-_'Ow••rwFOw••or•w�•tna•rWn•e•rF•1 � �'� •�
*GeoPentech
Al
.-.-�..r..•.�•r�r�r�_'��.. ._-.. • . • _-�__ wnx•n/wuru.u.wnr,
Final August 2019 3-34
SECTION THREE Risk Assessment
LIQUEFACTION
The potential for liquefaction exists in areas susceptible to ground shaking with loose soils and/or shallow
groundwater. Given the active faults in the region and the presence of geologically young,
unconsolidated sediments and hydraulic fills, liquefaction is possible throughout much of Orange County.
The California Geological Survey's Seismic Hazards Zonation Program identifies and maps areas prone
to liquefaction. These zones for Orange County are shown in Figure 3-6. The most extensive
liquefaction zones occur in coastal areas, including parts of Huntington Beach and Newport Beach, and
along Upper Newport Bay. In addition, a 2016 Seismic Hazard Assessment conducted by GeoPentech,
Inc. found that the highest liquefaction hazard areas are the flat, coastal portions of the planning area, and
the risk decreases moving inland. The areas identified as being highly susceptible to liquefaction are the
San Juan Creek/San Clemente Beach areas.
3.2.6.4 Magnitude/Severity
Ground shaking is measured using either the moment magnitude scale (MMS, denoted as Mw or simply
M) or the Modified Mercalli Intensity Scale. The MMS is a replacement for the Richter scale, which is
still often referred to but is no longer actively used, as the Richter scale is not reliable when measuring
large earthquakes.18 The weakest earthquakes measured by the MMS start at 1.0, with the numbers
increasing with the strength of the earthquake. The strongest recorded earthquake, which struck Chile in
1960, measured 9.5 on the MMS.19 Like the Richter scale, the MMS is a logarithmic scale, meaning the
difference in strength between two earthquakes is much larger than the difference in their measurements.
For example, a 6.0 Mw earthquake is 1,000 times stronger than a 4.0 Mw earthquake and about 1.4 times
as strong as a 5.9 Mw event.
The Modified Mercalli Intensity Scale is based on the damage caused by the earthquake and how it is
perceived, rather than an actual measurement. When comparing multiple earthquakes, one event may
have a higher Mercalli rating than another even if it released less energy, and thus was measured lower on
the MMS. The Mercalli scale ranges from I(instrumental,rarely felt by people)to XII(catastrophic,total
damage and lines of sight are distorted). Table 3-8, Comparison ofMMS and Modified Mercalli Intensity
Scale, shows a general comparison between the MMS and the Modified Mercalli Intensity Scale. Note
that there is some overlap toward the higher end of the Mercalli ratings, with certain intensities produced
by multiple ranges of magnitude measurements.
18 2014. "Moment Magnitude, Richter Scale." https://www.usgs.gov/faqs/moment-magnitude-richter-scale-what-are-
different-magnitude-scales-and-why-are-there-so-many.
19 2015."Earthquake Lists,Maps,and Statistics."https://earthquake.usgs.gov/earthquakes/browse/.
Final I August 2019 3-35
SECTION THREE Risk Assessment
Figure 3-6
Liquefaction Susceptibility Zones
San Bernardino
County
Los Angeles
4
%moo,r,�Fed ` Riverside County
�;ru I Jr
EAR AEa x nur ors x^nnox /
10,1111,
l N
YB'9 iyoxR I
LA
Water Districts Infrastructure \ !
0 Reservoirs ..
I Rescry
MET Diemer Filtration Plant su f
8 Water Treatment Plant
Wastewater Treatment Plant XTI=="a wE r
Potable Local Liquefaction
MET/Joint Agency Pipe Lines Susceptability sc leg.l
-Local Sewer Lines Very Hig
San Diego County
- h
Regional Sewer Lines
Outfall Lines High N
---- Force Mains Moderate w+E
s
Water Agency Boundary Unknown o a.s 5 10
MR es
ORANGE COUNTY
POTABLE AND WASTEWATER INFRASTRUCTURE
Final I August 2019 3-36
SECTION THREE Risk Assessment
Table 3-8
Comparison of MMS and Modified Mercalli Intensity Scale
Magnitude(MMS) Modified Mercalli Intensity Scale
Intensity A Description :a
1.0 to 3.0 I Not felt except by very few persons under especially favorable conditions.
II Weak: Felt only by a few persons at rest,especially on upper floors of buildings.
3.0 to 3.9 Weak: Felt quite noticeably by persons indoors,especially on upper floors of buildings.
III Many people do not recognize it as an earthquake. Standing motor cars may rock slightly.
Vibrations similar to the passing of a truck. Duration estimated.
Light: Felt indoors by many,outdoors by few during the day. At night,some awakened.
IV Dishes,windows,doors disturbed;walls make cracking sound. Sensation like heavy truck
4.0 to 4.9 striking building. Standing motor cars rocked noticeably.
V Moderate: Felt by nearly everyone; many awakened. Some dishes,windows broken.
Unstable objects overturned. Pendulum clocks may stop.
VI Strong: Felt by all, many frightened. Some heavy furniture moved;a few instances of
5.0 to
fallen plaster. Damage slight.
5.9 Very Strong: Damage negligible in buildings of good design and construction;slight to
VII moderate in well-built ordinary structures;considerable damage in poorly built or badly
designed structures;some chimneys broken.
Severe: Damage slight in specially designed structures;considerable damage in ordinary
6.0 to 6.9 VIII substantial buildings with partial collapse. Damage great in poorly built structures. Fall of
chimneys,factory stacks,columns,monuments,walls. Heavy furniture overturned.
Violent: Damage considerable in specially designed structures;well-designed frame
IX structures thrown out of plumb. Damage great in substantial buildings,with partial
7.0 and collapse. Buildings shifted off foundations.
greater Extreme: Some well-built wooden structures destroyed;most masonry and frame
X structures destroyed with foundations. Rails bent.
XI Extreme: Few, if any(masonry)structures remain standing. Bridges destroyed. Rails
bent greatly.
XII Extreme: Damage total. Lines of sight and level are distorted. Objects thrown into the air.
Source: USGS 2017.
Final I August 2019 3-3 7
SECTION THREE Risk Assessment
Several faults in Orange County can produce severe to extreme earthquakes. The SCEC and the Working
Group on California Earthquake Probabilities have determined the probable magnitude for an earthquake
along these major faults:
• Elsinore Fault Zone: SCEC reports probable earthquake magnitudes for the main trace of the
Elsinore fault to be in the range of 6.5 to 7.5. The two northern segments, the Whittier Fault and
the Chino Fault,have probable magnitudes of 6.0 to 7.2 and 6.0 to 7.0,respectively. The Whittier
Fault location is extremely critical because it crosses the two main sources of untreated water
being brought into the County (Yorba Linda Feeder and the Lower Feeder) and it passes very
close to the Diemer Filtration Plant which serves as the treatment facility for the bulk of Orange
County. Metropolitan does not have a backup system to supply treated water to many parts of
central and southern Orange County in the event of an outage of the Diemer Plant.
• Newport-Inglewood Fault Zone: SCEC reports probable earthquake magnitudes for the Newport-
Inglewood fault to be in the range of 6.0 to 7.4.
• Puente Hills Thrust Fault: Recent studies indicate that this fault has experienced four major
earthquakes ranging in magnitude from 7.2 to 7.5 in the past 11,000 years,but that the recurrence
interval for these large events is on the order of several thousand years.
• Peralta Hills Fault: The Earth Consultants International study for MWDOC indicates that this
may be a back thrust fault to the Elsinore fault and may be capable of a magnitude 6.8.
• San Andreas Fault Zone: Based on that evidence and other geophysical observations, the fault
has estimated the probability of a rupture with a magnitude 7.8 in the next 30 years (1994 through
2024) to be about 50 percent (SCEC, 1995). The range of probable magnitudes on the San
Andreas Fault Zone during this period is reported to be 6.8 to 8.0.
• San Joaquin Hills Fault: Recent reports have determined that the blind thrust fault can generate
an earthquake as large as 7.3. In addition, a minimum average recurrence interval of 1650 to
3100 years has been estimated for moderate-sized earthquakes on this fault.
• San Jacinto Fault Zone: SCEC reports probable earthquake magnitudes for the San Jacinto fault
zone to be in the range of 6.5 to 7.5.
Although the San Andreas Fault Zone can produce an earthquake with a magnitude greater than 8.0 M,
some of the smaller faults have the potential to inflict greater damage on the urban core of the Los
Angeles Basin. Seismologists believe that a 6.0 earthquake on the Newport-Inglewood Fault Zone would
result in far more death and destruction than a larger earthquake on the San Andreas Fault Zone, due to
the San Andreas' relatively remote location from the urban centers of southern California.
3.2.6.5 Probability of Future Occurrences
Based on the amount of seismic activity that occurs within the region,there is no doubt that communities
within the jurisdictional boundaries of MWDOC will continue to experience future earthquake events. It
is reasonable to expect that a major event (5.0 M or higher) and possibly even more severe will occur
within a 30-year timeframe.
Final I August 2019 3-3 8
SECTION THREE Risk Assessment
The Third Uniform California Earthquake Rupture Forecast (UCERF3), developed in 2014 by the
Working Group on California Earthquake Probabilities and led by the USGS, provides estimates of the
magnitude, location, and likelihood of fault rupture for more than 350 fault segments throughout the state.
For Southern California, the study estimated the likelihood of a 6.0 M earthquake at 100 percent, a 7.0
earthquake at 75 percent, and an 8.0 earthquake at 7 percent.20
Predicted ground shaking patterns throughout southern California for hypothetical scenario earthquakes
are available from the USGS as part of their on-going"ShakeMap"program. These maps are provided in
terms of Instrumental Intensity, which is essentially Modified Mercalli Intensity estimated from
instrumental ground motion recordings. ShakeMaps in graphical and GIS formats are available on the
USGS website at: https:Hearthquake.usgs.gov/data/shakemap/.
In 2014, USGS released a simplified Peak Ground Acceleration(PGA) map to demonstrate the 2 percent
probability of exceedance within a 50-year time period; refer to Fib. This analysis was done at the
nationwide level and can be seen in the figure below. California, and many parts of southern California,
have a risk of high PGA at this probability level.
Figure 3-7
Peak Ground Acceleration with 2 Percent Probability in 50 Years for the United States
70
1 _
, y
� I
30' IX PLANATION ❑ ' ❑ ---
Peekaaelerelian,enpreesed..
alnctionolsrandardgraaiN19109
----
04
--_ .Llyyr..�
0.3
0.0
0
Li
25' 01.1a fveae whore eueDected nomeclonic
eenhquakea have been deleted ,!`
0.0e
004
0,02 - —
0 -----
0 500 1.000 KILOMETERS
0 5uo IA00 MILES
Two-percent probability of exceedance in 50 years map of peak ground acceleration
20 https://pubs.usgs.gov/fs/2015/3009/pdf/fs20l5-3009.pdf.
Final I August 2019 3-39
SECTION THREE Risk Assessment
3.2.7 Flood
3.2.7.1 Description (Nature) of the Hazard
Flooding may result from heavy rains raising water levels in rivers and streams; storms, tides, and
weather patterns pushing ocean water into coastal areas; and when debris blocks normal storm water
drainage systems. Other causes are discussed in more detail elsewhere in the plan, including sea-level
rise in Section 3.2.1 and dam/reservoir failure in Section 3.2.4. Flooding can happen fast and with little
warning,or water levels may rise slowly over the course of several days.
Orange County's terrain makes it naturally susceptible to flooding. Many of the rivers, creeks, and
streams flow through natural floodplains on their way to the ocean. The County's rapid growth and
transformation from an agricultural community to an urban community has changed flood-control
practices in the region. Drainage is managed through reservoirs, dams, diversion structures and
developed plains. In addition, seven pump stations (Huntington Beach, Cypress, Seal Beach, Los
Alamitos, Rossmoor, Harbor-Edinger, and South Park) regulate storm water discharge to flood control
channels. Although there is a countywide system of flood-control facilities, many of these are not
designed for or capable of conveying runoff from major storms.
Orange County also has a warning system in place to detect potential flooding. The County began
installing its ALERT (Automated Local Evaluation in Real Time) system in 1983. Operated by the
County's Environmental Resources Section of the Resource Development and Management Department
(RDMD) in cooperation with the National Weather Service, ALERT uses remote sensors located in
rivers, channels and creeks to transmit environmental data to a central computer in real time. Sensors are
installed along the Santa Ana River, San Juan Creek, Arroyo Trabuco Creek, Oso Creek, Aliso Creek, as
well as flood control channels and basins. The field sensors transmit hydrologic and other data (e.g.,
precipitation data, water levels, temperature, wind speed, etc.) to base station computers for display and
analysis.
3.2.7.2 History/Past Occurrences
Residents reported damaging floods caused by the Santa Ana River as early as 1770 (as recorded by
explorer and missionary Father Juan Crespi). Major floods in Orange County along the Santa Ana River
occurred in 1810, 1815, 1825, 1862, 1884, 1891, 1916, 1927, 1938, 1969, 1983, 1993, 1995, 1998, 2005,
2010, and 2017. Often these events involved additional hazards, such as landslides, mud flows, and high
winds. Table 3-9, Presidential Disaster Declarations for Flooding in Orange County Since 1969, lists
Presidential Disaster Declarations since 1969 that involved flooding and affected Orange County.
Final I August 2019 3-40
SECTION THREE Risk Assessment
Table 3-9
Presidential Disaster Declarations for Flooding in Orange County Since 1969
Disaster Incident Type Title Incident Incident
Number Begin Date End Date
4305 Flood Severe winter storms,flooding,and mudslides. 1/18/2017 1/23/2017
1952 Flood Severe winter storms,flooding,and debris and mud flows. 12/17/2010 1/4/2011
1585 Severe Storm(s) Severe storms,flooding,landslides,and mud/debris flows. 2/16/2005 2/23/2005
1577 Severe Storm(s) Severe storms,flooding,debris flows,and mudslides. 12/27/2004 1/11/2005
1203 Severe Storm(s) Severe winter storms and flooding. 2/2/1998 4/30/1998
1046 Severe Storm(s) Severe winter storms,flooding landslides,mud flow. 2/13/1995 4/19/1995
1044 Severe Storm(s) Severe winter storms,flooding,landslides,mud flows. 1/3/1995 2/10/1995
979 Flood Severe winter storm,mud&landslides,and flooding. 1/5/1993 3/20/1993
935 Flood Rain/snow/wind storms,flooding, mudslides. 2/10/1992 2/18/1992
812 Flood Severe storms,high tides and flooding. 1/17/1988 1/22/1988
677 Coastal Storm Coastal storms,floods,slides and tornadoes. 1/21/1983 3/30/1983
615 Flood Severe storms,mudslides and flooding. 1/8/1980 1/8/1980
547 Flood Coastal storms,mudslides and flooding. 2/15/1978 2/15/1978
253 Flood Severe storms and flooding. 1/26/1969 1/26/1969
The most significant flood events to affect the county are summarized below:
• Great Flood of 1862. The flood of January 1862, called the Noachian deluge of California, was
unusual in two ways: 1) the storm causing the flood occurred during a very severe drought
spanning 1856 to 1864; and 2) the flood lasted 20 days, which is considered an extremely long
duration. Under normal circumstances,major floods last only a few days. The only structure left
standing along this portion of the Santa Ana River was the Aqua Mansa chapel and residents
gathered on the small point of high-land to take refuge from the storm. Miraculously, there were
no recorded deaths.
• Great Flood of 1916 On January 27, 1916, flood waters inundated a large area along the Santa
Ana River, including Main Street in downtown Santa Ana, where the water was 3 feet deep.
Adjacent farm lands, which later became the City of Westminster, also flooded. Three vehicular
bridges and three railroad bridges were washed away by the flood and four people drowned.
• Great Flood of 1938. The flood of 1938 is considered the most devastating flood to occur in
Orange County during the 20t1i Century and affected all Southern California. The storm began on
February 27 and lasted until March 3. In the Santa Ana Basin, 34 people died, and 182,300 acres
were flooded. All buildings in Anaheim were damaged or destroyed. Two major railroad
bridges, seven vehicular bridges, and the town of Atwood were destroyed. The Santa Ana River
inundated the northwestern portion of Orange County and train service to and from Santa Ana
was cancelled. The maximum discharge on March 3, 1938 was 46,300 cfs, with a gage height at
10.20 feet. Damage exceeded$50 million.
• Great Flood of 1969. The floods of January and February 1969 were the most destructive on
record in Orange County. Previous floods had greater potential for destruction, but the County
Final I August 2019 3-41
SECTION THREE Risk Assessment
was relatively undeveloped when they occurred. During the flood of 1969, rain fell almost
continuously from January 18 to January 25, resulting in widespread flooding. Orange County
was declared a national disaster area on February 5. A second storm hit on February 21 and
lasted until February 25 bringing rain to the already saturated ground. This second storm
culminated in a disastrous flood on February 25. The storm resulted in the largest peak outflow
from Santiago Reservoir since its inception in 1933. The reservoir at Villa Park Dam reached its
capacity for the first time since its construction in 1963; the dam had a maximum inflow of
11,000 cfs. The outlet conduit was releasing up to 4,000 cfs yet the spillway overflowed at 1:30
p.m. and continued for 36 hours. The maximum peak outflow from the dam reached 6,000 cfs.
Although the safety of the dam was never threatened the outflow caused serious erosion
downstream in the cities of Orange and Santa Ana and in some parks and golf courses. A
Southern Pacific Railroad bridge, water and sewer lines, a pedestrian over crossing, and three
roads washed out. Approximately 2,000 Orange and Santa Ana residents were evacuated from
houses bordering Santiago Creek.
• Great Flood of 1983. An intense downpour and high tides associated with El Nino (due to the
presence of a low-pressure system) caused intense shoreline flooding. Meanwhile the Santa Ana
River crested its sides near the mouth of the ocean; creating a disaster for the low-lying areas of
Huntington Beach; floodwaters were 3 to 5 feet deep.
• 1992 Coastal Storms. In 1992, several coastal storms affected many coastal utilities storm drain
and sewage treatment processes. SOCWA reported significant cracks and damage to its Aliso
Creek Ocean outfall.
• Great Floods of 1993. El Nino caused more flooding. An intense storm was concentrated in the
Laguna Canyon Channel area extending from Lake Forest to downtown Laguna Beach. In spite
of a valiant effort to save downtown merchants by sandbagging,the stores were flooded. Laguna
Canyon Road was damaged extensively, as well as homes and small businesses in the Laguna
Canyon Channel. There were no fatalities reported.
0 Great Flood of 1995. A disaster was declared in Orange County after extremely heavy and
intense rains exceeded the storm runoff capacity of local drainage systems in many Orange
County cities and regional Flood Control District systems. As a result, widespread flooding of
homes and businesses occurred throughout these cities. There were approximately 1,000 people
evacuated and extensive damage sustained to both private and public property.
0 Great Floods of 199711998. El Nino Storms that occurred during this period created extensive
storm damage to private property and public infrastructure,with damages reaching approximately
$50 million. Storm conditions caused numerous countywide mudslides, road closures, and
channel erosion. Hillside erosion and mudslides forced the continual clearing of roads of fallen
trees and debris. Protective measures, such as stabilizing hillside road slopes with rock or K-rail
at the toe of slopes, were taken to keep the normal flow of transportation. Harbors, beaches,
parks, and trails also sustained substantial storm damage.
• 201012011 Winter Storms. On January 26, California received Presidential Declaration for the
Severe Winter Storms, Flooding, and Debris and Mud Flows that occurred December 17, 2010
through January 4, 2011. At the time of the declaration the State of California incurred well over
$75 million in damages, while Orange County sustained over $36 million in damages. Orange
Final August 2019 3-42
SECTION THREE Risk Assessment
County sustained extensive damage sustained to private and public property, as well as critical
infrastructure.
• 2017 Winter Storms.21 Southern California experienced three storms over six days starting on
January 18. The heavy rains, combined with already saturated soil, produced flash flooding
across much of Orange County. Streets flooded with 1 to 3 feet of water in Huntington Beach,
Santa Ana, and Newport Beach. Responders conducted rescue operations on the Santa Ana River
in the cities of Orange and Huntington Beach. The storms resulted in a Presidential Disaster
Declaration for 16 counties throughout the state.
3.2.7.3 Location/Geographic Extent
Orange County covers 789 square miles and its landscape varies from mountainous terrain (in the
northeast and southeast) to floodplains (in the central and western section). Figure e 3-8 identifies the 100-
and 500-year FEMA floodplains within the County. A sizable portion of north Orange County, including
some of the County's most densely populated areas, is within a 500-year floodplain, which denotes areas
with a one-in-500, or 0.2 percent, chance of flooding in any given year. These floodplains are further
explained in Sections 3.2.7.4 and 3.2.7.5.
The Santa Ana River, flowing through the heart of Orange County to the Pacific Ocean, is the County's
greatest flood threat. Other areas subject to flooding during severe storms include areas adjacent to
Atwood Channel, Brea Creek Channel, Fullerton Creek Channel, Carbon Creek Channel, San Juan Creek
Channel, and East Garden Grove-Wintersburg Channel. Areas adjacent to Santiago Creek and Collins
Channel in the central portion of the County and large portions of the San Diego Creek watershed in the
City of Irvine and unincorporated areas of the County are also subject to inundation. In the southern
portion of the county, canyon areas are subject to flooding. The continued development in these areas has
made the flood hazard even greater.
3.2.7.4 Magnitude/Severity
Flood severity is often described in terms of a 100-year flood, describing an event that is likely to occur
once in a 100-year period. In other words, there is a 1 percent probability of an event this severe
occurring in any given year. Flood Insurance Rate Map (FIRM)panels produced by FEMA identify areas
subject to this level of risk as being within the 100-year floodplain. Fi urn shows these locations
throughout Orange County, as well as a 500-year floodplain, which indicates a 0.2 percent annual chance
of flooding.
Floods can also be measured in terms of data collected by U.S. Geological Survey through a nationwide
system of stream gages. The primary gage on the Santa Ana River is in the City of Santa Ana. During
the Great Flood of 1938, this gage measured a water level of 10.2 feet, compared to a normal height of
about 1.44 feet. During both two most recent flood events in 2010/2011 and 2017, the river reached 7.6
feet.
21 NCEI. Storm Events Database. https://www.ncdc.noaa.gov/stonnevents/eventdetails.jsp?id=676168; and The
Orange County Register. January 23, 2017. Flooding, mudslides, power outages follow torrential rainstorm. https://www.
ocregister.com/2017/01/23/flooding-mudslides-power-outages-follow-torrential-rainstorm/.
Final I August 2019 3-43
SECTION THREE Risk Assessment
Figure 3-8
Flood Zones
San Bernardino
�i County
Los Angeles oi.ngeC-, Reef
County - ERR
ewFA^
r
Riverside County
.E.N ow,N E
/bF11L lFIiCN REA
r/ —r' �mVFPnNrn Wpikx nl9.RlCi q� ' y
Ns RRi
f �—
vl� , jV y
9E:�A s.P �o�N �� ,- I` , -- �.
Water Districts Infrastructure
• Reservoirs
� I
MET Diemer Filtration Plant
Water Treatment Plant Y f r r \ `�sf aid
Wastewater Treatment Plant IN".ERMS— /_ N<
Potable Local \ "
— MET/Joint Agency Pipe Lines 'E° San Diego County
Local Sewer Lines
—Regional Sewer Lines Flood Zones
— N
Outfall Lines
---Force Mains _ FEMA 100 Year w+E
O Water Agency Boundary - o 2.5 s 10 FEMA 500 Year
�I II �\
Mlles
ORANGE COUNTY
POTABLE AND WASTEWATER INFRASTRUCTURE
Final I August 2019 3-44
SECTION THREE Risk Assessment
The greatest flood in terms of water flow occurred in 1862, when the Santa Ana River saw an estimated
flow rate of 317,000 cubic feet per second(cfs). This flood was three times greater than the Great Flood
of 1938 which had an estimated flow of 110,000 cfs. Peak discharges measured on the Santa Ana River
during declared flood disasters since 1993 have ranged from 8,220 to 31,700 cfs.
On December 22, 2010, during the peak of that winter's floods, a weather station in Silverado Canyon
recorded more than 7 inches of rain in a single day, according to NOAA climate data. During other flood
events in the last 25 years,the maximum daily rainfall recorded within Orange County has ranged from 2
to 4 inches.
3.2.7.5 Probability of Future Occurrences
As mentioned in Section 3.2.7.4, FIRM panels depict areas that have a 1 percent chance of flooding in
any given year, identified as a 100-year floodplain, as well as a 0.2 percent chance, or a 500-year
floodplain. Such areas within Orange County are depicted in Figure 3-8.
3.2.8 Geologic Hazards (Expansive Soils & Land Subsidence)
3.2.8.1 Description (Nature) of the Hazard
EXPANSIVE SOILS
According to a scientific paper published in the Journal of Geotechnical Engineering (Day 1994),
"expansive soil is a worldwide problem that causes extensive damage to civil engineering structures."
Expansive soils are particularly problematic in the southwestern United States and especially in southern
California, where there are large clay deposits compounded by "alternating periods of rainfall and
drought." The problem with constructing on expansive soils is that the clay, often referred to as adobe,
expands rapidly during the rainy season and contracts gradually during the dry season causing "shrink-
swell." Shrink-swell is particularly problematic for "slab-on-grade" foundations which can be placed
directly on expansive soil which are constantly in a state of movement as the soil expands and contracts
causing the foundation to fatigue and crack. Buildings with balloon frame construction are also
susceptible to bowing and cracking when built on expansive soils. Shrink and swell can affect
water/wastewater facilities particularly buildings or structures built using slab on grade or balloon frame
construction techniques.
Expansive soil is also known to "creep" on unstable slopes eventually leading to landslides. Typically,
this is found when expansive soil underlies compact topsoil. As the expansive soil expands-contracts,the
compact topsoil slides or creeps downhill. Facilities built on unstable slopes with underlying expansive
soils are prone to movement and can be damaged or destroyed in extreme circumstances.
LAND SUBSIDENCE
The United States Geological Survey (USGS) defines land subsidence as a gradual settling or sudden
sinking of the ground surface because of subsurface movement of underlying geologic units. Scientists at
the USGS have determined that nearly 17,000 square miles in 45 states have been directly affected by
land subsidence, caused by aquifer-system compaction, drainage of organic soils, underground mining,
hydro-compaction, natural compaction, sinkholes, and thawing permafrost. More than 80 percent of land
subsidence is caused by over-use of groundwater and the increasing development of land and water
resources threatens to worsen existing land-subsidence problems (while initiating)new ones.
Final I August 2019 3-45
SECTION THREE Risk Assessment
Land subsidence in California is mainly caused by groundwater pumping in areas where aquifer recharge
is exceeded. Known as "over-drafting," the dewatering of aquifers has led to lower water tables and
subsidence, resulting in damage to infrastructure, water quality and in coastal areas has resulted in the
intrusion of seawater. USGS notes "the compaction of unconsolidated aquifer systems that can
accompany excessive groundwater pumping is by far the single largest cause of subsidence" and "the
overdraft of such aquifer systems has resulted in permanent subsidence and related ground failures,"thus
"the extraction of this resource for economic gain constitutes `groundwater mining' in the truest sense of
the term." Over-drafting is further exacerbated in hot geographic regions with a large population; this
includes much of the southern California.
3.2.8.2 History/Past Occurrences
EXPANSIVE SOILS
In 1980, Krohn and Slosson (1980) made an assessment and cost estimate of the damage caused by
expansive soils throughout the United States. They estimated that approximately $7 billion in property
damage was reportedly attributed to construction on expansive soils. While no recent figures have been
identified, the increase in construction activity in areas of expansive soil, especially in southern
California,will undoubtedly cause this number to increase. J. David Rogers of the University of Missouri
found that"expansive soils are the second leading cause of property damage in the United States."
There are no reported occurrences of expansive soils causing considerable damage within the County;
although expansive soils are known to exist. Typically, expansive soils would be identified at a local
level on a site-by-site or area basis and are addressed as part of the development review process.
LAND SUBSIDENCE
The relationship between subsidence and groundwater pumping was not fully recognized until 1928 when
O.E. Meinzer, scientist with the United States Forest Service (USFS), realized that aquifers were
compressible. By the 1950s, the USGS made a concerted effort to measure the amount of ground
subsidence. In 1952, Joseph Poland studied large discrepancies between the U.S. Coast and Geodetic
Survey for the Santa Clara and San Joaquin valleys. Poland noted that the increased use of groundwater
correlated with the amount of ground subsidence. Poland's work led to the verification of"consolidation
theory" or compressible aquifers, as well as leading to the development of "definitions, methods of
quantification, and confirmation of the interrelationship among hydraulic-head declines, aquitard (clay)
compaction,and land subsidence."
Subsidence has historically occurred in Orange County associated with groundwater pumping and from
peat decomposition. The areas of historic subsidence associated with groundwater pumping are
illustrated in Figure 3-9, below. Localized subsidence possibly due to peat decomposition has also been
reported in scattered areas inland from the coast between Sunset and Newport Beaches.
3.2.8.3 Location/Geographic Extent
EXPANSIVE SOILS
According to the County of Orange General Plan Safety Element, much of Orange County is covered by
soil that may cause cracking in concrete foundations. The most prevalent problems occur from clay or
"expansive" soils that contract and expand. Problems attributed to expansive soils are usually related to
Final I August 2019 3-46
SECTION THREE Risk Assessment
improperly designed or constructed foundations. Due to the diversity of soil conditions, structures are not
completely safe from cracking, slipping, or sinking to some degree. Expansive soils are typically
mitigated through structural and design regulations as well as through soil treatment techniques. The
California Building Code specifically addresses expansive soils in Sections 1804.4, 1806.5 and 1815.
The California Health and Safety Code Section 17954 states that "If the preliminary soil report indicates
the presence of critically expansive soils or other soil problems which, if not corrected, would lead to
structural defects, such ordinance shall require a soil investigation of each lot in the subdivision" and
"The soil investigation shall be prepared by a civil engineer who is registered in this state." Expansive
soils can impact the entire planning area.
LAND SUBSIDENCE
Currently, land subsidence affects much of the west coast. The major land-subsidence affected area of
Orange County exists between Newport Beach and Huntington Beach and five miles inland from this
point. This area is referred to as the Talbert Gap, which formed millennia ago from alluvial deposition
from the Santa Ana River.
According to the USGS online map viewer, areas starting from Newport Beach up to Seal Beach, and out
east to Placentia, experience subsidence impacts due to groundwater pumping. Figure , shows the
areas impacted by subsidence.
Figure 3-9
Subsidence
...�- Willowbrook �✓`�"__. " . �StabP*,k
+ Earl a La Mirada { f--'`
Compton Yorba
f Compton
i.
Layers' entla I v
e Cause of Subsidence W"
. curia
■Groundwater Pumping Atka
-VIIW
■Peat Loss
Oii Extraction t�
1
._ —Long North
Beach Tustin `
al/ �
Pon �' s L—st.
of Los G any.
Argska Rage.
Par%
� J
i 1
oCPA1JU
Pac f%CO SAN \
JOAQUIN ake.
MILLS r.
Fore t
' ,,S�Laguna
Laguna
boods HII_IS
Final August 2019 3-47
SECTION THREE Risk Assessment
3.2.8.4 Magnitude/Severity
EXPANSIVE SOILS
Damages to property due to erosion and deposition are usually classified as cosmetic, functional, or
structural. Cosmetic damages refer to slight problems where only the physical appearance of a structure
is affected(e.g., cracking in plaster or drywall). Functional damages refer to situations where the use of a
structure has been impacted due to subsidence. Structural damages include situations where entire
foundations require replacement due to subsidence-caused cracking of supporting walls and footings.
Buildings and infrastructure across Orange County are vulnerable to the impacts of soil expansion,
instability, and erosion-related hazards. Cities in southern California have established guidelines for
construction in areas of expansive soils. The MAs generally conduct soil surveys prior to construction of
water and wastewater facilities and take the specific circumstances into consideration during design and
construction. The magnitude and severity of expansive soils are similar throughout the planning area.
LAND SUBSIDENCE
The Talbert Gap, as described above, has sustained nearly a century of underground water aquifer
pumping which was used to sustain intensive grazing and agriculture practices. By 1956 the water table
had lowered to below sea level allowing saltwater from the Pacific Ocean to intrude through the Talbert
Gap. Because of studies identifying subsidence and saltwater intrusion in Orange County, OCWD began
a massive management program to minimize the loss of aquifer-stored water and reduce saltwater
intrusion. Although subsidence is a concern within Orange County, programs have been implemented to
address subsidence issues. The MAs within the portion of the planning area identified as having historic
subsidence could continue to be impacted if it is not monitored and addressed.
3.2.8.5 Probability of Future Occurrences
EXPANSIVE SOILS
Expansive soils will continue to occur throughout the planning area. Potential impacts associated with
these hazards will need to be addressed through site design and development review, including
preparation and adherence to geotechnical constraints recommendations.
LAND SUBSIDENCE
In areas that have experienced decreased precipitation in the summer months and reduced surface-water
supplies, communities are often forced to pump more ground water to meet their needs. Orange County
has historically experienced long term-droughts, especially in recent years. Although specific areas of
excessive pumping, such as Talbert Gap, have been addressed, there is still a high probability that
communities within the planning area will continue to experience impacts of these events.
It is important that these communities consider future mitigation actions that will address this hazard,
particularly in newly developing areas near water. In areas where groundwater pumping has caused
subsidence, switching to surface water supplies can be instrumental. Changing climate norms are
expected to affect soil resources and especially during hot, dry years annual grasses that stabilize and
protect topsoil often fail to germinate or do not grow well. This leaves soil surfaces highly vulnerable to
Final I August 2019 3-48
SECTION THREE Risk Assessment
erosion from wind and precipitation and can further exacerbate the consequences of soil expansion and
subsidence.
3.2.9 High Winds/Santa Ana Winds
3.2.9.1 Description (Nature) of the Hazard
High winds are defined as those that last longer than one hour at greater than 39 miles per hour(mph) or
for any length of time at greater than 57 mph. High winds that affect Orange County, notably Santa Ana
winds, are generally defined as warm, dry winds that blow from the east or northeast (offshore). Santa
Ana winds often blow with exceptional speed in the Santa Ana Canyon and forecasters at the National
Weather Service in Oxnard and San Diego usually place speed minimums on these winds and reserve the
use of "Santa Ana" for winds greater than 25 knots. The complex topography of southern California
combined with various atmospheric conditions creates numerous scenarios that may cause widespread or
isolated Santa Ana events. Commonly, Santa Ana winds develop when a region of high pressure builds
over the Great Basin (the high plateau east of the Sierra Mountains and west of the Rocky Mountains
including most of Nevada and Utah). Clockwise circulation around the center of this high-pressure area
forces air down slope from the high plateau. The air warms as it descends toward the California coast at
the rate of 5 degrees Fahrenheit per 1,000 feet due to compression of the air mass. The air is dry since it
originated in the desert,and it dries out even more as it is compressed.
3.2.9.2 History/Past Occurrences
Most high wind incidents in the planning area are the result of Santa Ana wind conditions. While high
impact wind incidents are not frequent in the area, significant Santa Ana wind events have impacted the
County. The National Oceanic and Atmospheric Administration (NOAA) Storm Events Database
identifies 145 events reported within Orange County between December 1, 1950 and December 31, 2017.
Table 3-10,Major High Wind Events, identifies and describes some of the major events occurring within
Orange County.
3.2.9.3 Location/Geographic Extent
Santa Ana winds blow westward through the canyons toward the coastal areas of southern California.
Orange County commonly experiences Santa Ana winds between October and March. The winds are not
location specific,but rather impact the entire planning area.
3.2.9.4 Magnitude/Severity
Wind speeds are typically 35 knots through and below passes and canyons with gusts to 50 knots.
Stronger Santa Ana winds can have gusts greater than 60 knots over widespread areas with gusts greater
than 100 knots in some areas. Frequently, the strongest winds in the basin occur during the night and
morning hours due to the absence of a sea breeze. The sea breeze which typically blows onshore daily,
can moderate the Santa Ana winds during the late morning and afternoon hours. Santa Ana winds are an
important forecast challenge because of the high fire danger associated with them. Santa Ana winds can
adversely affect power utilities that have transformers and power lines, in turn affecting the ability of
some water and wastewater utilities to operate when back-up generation is unavailable. The magnitude
and severity of Santa Ana winds are similar throughout the planning area.
Final I August 2019 3-49
SECTION THREE Risk Assessment
Table 3-10
Major High Wind Events
Magnitude Property
Date Location (kts) Damage Description
(dollars)
Severely disrupted transportation, power, and daily
North East Orange activities. Broken trees and power poles were common
12/9/1998 County 81 50,000 throughout the area and power was knocked out to
180,000 customers. Downed power lines also started
several wild fires,damaging one house.
Most of the major highways in the Inland Empire and
Santa Ana Mountains through the Santa Ana Mountains were closed, partially
12/3/1999 and Foothills 104 20,000 due to two semi-tractor trailers that overturned, partially
from blowing dust reducing visibility, and partially from
road signs and other debris being blown onto the roads.
3/20— Santa Ana Mountains Damage ranged from downed power poles,trees falling
3/21/2000 and Foothills 51 25,000 on cars and houses, fruit being knocked off of trees,
and blowing sand and dust lowering visibility to zero.
Numerous trees and power poles were blown down. At
least 60 communities were affected. A commuter train
was delayed for several hours in Orange County when
Santa Ana Mountains power poles were blown down onto the track. A brush
1/5—1/7/2003 and Foothills fire whipped by the winds, damaged 5 houses and
burned 150 acres. Sparks from downed power lines
started numerous small brush fires, but these were
quickly contained. Many houses and at least 300
parked automobiles were damaged by falling trees.
11/23/03 Santa Ana Mountains 50 50,000 Trees,power lines,and signs were knocked down.
and Foothills
12/16/04 Northeast Orange 68 20,000
2/3/05 Santa Ana Mountains 53 5,000
and Foothills
3/31/05 Northeast Orange 54 5,000 Strong Santa Ana winds caused power outages, blew
over big ri s,and knocked down trees.
Surface high pressure over the Great Basin resulted in
gusty Santa Ana winds from the San Bernardino
Santa Ana Mountains mountains, through the Inland Empire, and into Orange
1/22/06 and Foothills 62 15,000 County. Wind gusts over 60 mph toppled trees and
power poles. Downed power lines caused sporadic
power outages. Most of the property damage that
occurred came as a direct result of falling trees.
Santa Ana Mountains Santa Ana winds toppled trees, brought down power
and Foothills/Orange lines, and knocked out power to thousands in many
10/21-22/2007 County Coastal 74 100,000 parts of Orange County. The strongest winds were felt
Areas along the foothills of the Santa Ana mountains and near
the Chino Hills area.
Final I August 2019 3-50
SECTION THREE Risk Assessment
Table 3-10 [continued]
Major High Wind Events
Magnitude Property
Date Location (kts) Damage Description
(dollars)
This system set off intense showers and isolated
thunderstorms with pea-sized hail (accumulations in
Rancho Cucamonga and Mission Viejo), as well as
several funnel clouds spotted east of John Wayne
Airport. Most of the rain with this system was confined
to Orange County, the Inland Empire and the northern
mountains. Heavy rain was observed in Orange County
and the Inland Empire on the 15th and 16th with
locations there recording between one-quarter and one-
12/16/11 Santa Ana Mountains 56 15,000 half inch. Strong winds were also observed with this
and Foothills storm, especially on the 16th, which was a more
widespread wind event than early December, impacting
all counties, including San Diego County, with warning-
level winds. Several wind gusts of 45-65 mph were
reported in the Santa Ana Mountains,the Inland Empire
and San Diego County Mountains. Several trees and
power poles were downed, leaving many without power.
Power poles were reported down in Yorba Linda and
around 240 customers were reported without power in
Tustin.
The highest wind gusts occurred in the San Diego
1/14/14 Santa Ana Mountains 67 2,000 County foothills and inland Orange County, including
and Foothills the Santa Ana Mountains. Winds downed fiber optic
lines near Santiago Canyon in Orange County.
Orange County Strong northeasterly winds downed numerous trees
2/12/16 Inland 52 20,000 near Irvine, Santa Ana and Orange. Approximately 85
customers lost power in the city of Santa Ana.
A strong trough and associated Pacific cold front swept
into southern California from the west, bringing strong
winds, heavy snow and rain. The storm was
noteworthy for the strong prefrontal southerly winds that
produced significant tree damage over the coast and
Orange County valleys. In the mountains the ski resorts received 1-2 ft
2/17/17 Coastal 52 75,000 of snow, while elevations as low as 5,000 ft saw a few
inches of accumulation. Rainfall ranged from 2-6
inches along the coastal slopes to 1-2 inches at the
coast. At the beaches surf heights reached 8 to 12 ft.
An isolated peak gust of 60 mph occurred at San
Clemente Pier. Numerous trees were downed over the
coastal areas.
Orange County Report of a large tree downed by strong winds in
12/4/17 Inland 52 15,000 Orange. Tree damage, minor roof damage, and an
exploding transformer were also reported in Santa Ana.
Notes: kts=knots. One 1 knot is equal to 1.151 miles per hour(mph).
National Oceanic and Atmospheric Administration, National Centers for Environmental Information, Storm Events Database, Event Types:
High Winds,https://www.ncdc.noaa.gov/stormevents/choosedates.jsp?statefips=6,CALIFORNIA,accessed March 21,2018.
Final I August 2019 3-5 1
SECTION THREE Risk Assessment
3.2.9.5 Probability of Future Occurrences
High winds, including Santa Ana winds, will continue to occur annually in the County. The probability
of future occurrence throughout the planning area is high.
3.2.10 LandslidelMudflow
3.2.10.1 Description (Nature) of the Hazard
Landslide is a general term for a falling mass of soil or rocks. Mudflow consists of material that is wet
enough to flow rapidly and contains at least 50 percent sand, silt, and clay-sized particles. The primary
effects of landslides/mudflows can include:
• Abrupt depression and lateral displacement of hillside surfaces over distances of up to several
hundreds of feet.
• Disruption of surface drainage.
• Blockage of flood control channels and roadways.
• Displacement or destruction of improvements such as roadways,buildings, and water wells.
Landslides are a type of`mass wasting' which denotes any down slope movement of soil and rock under
the direct influence of gravity. The term `landslide' encompasses events such as rock falls, topples,
slides, spreads, and flows. Landslides can be initiated by rainfall, earthquakes, volcanic activity, changes
in groundwater, disturbance and change of a slope by man-made construction activities, or any
combination of these factors. Landslides can occur underwater, causing tidal waves and damage to
coastal areas. These landslides are called submarine landslides (USGS Fact Sheet 0071-40,Version 1.0).
Failure of a slope occurs when the force that is pulling the slope downward(gravity) exceeds the strength
of the earth materials that compose the slope. They can move slowly, (millimeters per year) or can move
quickly and disastrously, as is the case with debris-flows. Debris-flows can travel down a hillside of
speeds up to 200 miles per hour(more commonly, 30—50 miles per hour), depending on the slope angle,
water content, and type of earth and debris in the flow. These flows are initiated by heavy, usually
sustained,periods of rainfall,but sometimes can happen because of short bursts of concentrated rainfall in
susceptible areas. Burned areas charred by wildfires are particularly susceptible to debris flows, given
certain soil characteristics and slope conditions.
A debris or mud flow is a river of rock, earth and other materials, including vegetation that is saturated
with water. This high percentage of water gives the debris flow a very rapid rate of movement down a
slope. This high rate of speed makes debris flows extremely dangerous to people and property in its path.
Earthquakes often trigger flows. Debris flows normally occur when a landslide moves down-slope as a
semi-fluid mass scouring, or partially scouring soils from the slope along its path. Flows are typically
rapid moving and also tend to increase in volume as they scour out the channel. Flows often occur during
heavy rainfall, can occur on gentle slopes, and can move rapidly for large distances.
Wildland fires on hills covered with chaparral are often a precursor to debris flows in burned out canyons.
The extreme heat of a wildfire can create a soil condition in which the earth becomes impervious to water
by creating a waxy-like layer just below the ground surface. Since the water cannot be absorbed into the
soil, it rapidly accumulates on slopes, often gathering loose particles of soil into a sheet of mud and
debris. Debris flows can often originate miles away from unsuspecting persons, and approach them at a
high rate of speed with little warning.
Final I August 2019 3-52
SECTION THREE Risk Assessment
Natural processes can cause landslides or re-activate historical landslide sites. The removal or
undercutting of shoreline-supporting material along bodies of water by currents and waves produces
countless small slides each year. Seismic tremors can trigger landslides on slopes historically known to
have landslide movement. Earthquakes can also cause additional failure(lateral spreading)that can occur
on gentle slopes above steep streams and riverbanks.
3.2.10.2 History/Past Occurrences
The following identifies some of the more major landslide occurrences within Orange County. There
have been no disaster declarations within Orange County associated with landslides/mudflows.
• 1978 Bluebird Canyon, Orange County. The cost of recovery was $52.7 million (2000 dollars)
with 60 houses destroyed or damaged. Unusually heavy rains in March of 1978 may have
contributed to initiation of the landslide. Although the 1978 slide area was approximately 3.5
acres, it is suspected to be a portion of a larger, ancient landslide.
• 1980 Southern California Slides. The damage was estimated at $1.1 billion in 2000 dollars.
Heavy winter rainfall in 1979-80 caused damage in six southern California counties. In 1980,the
rainstorm started on February 8 with 5 days of continuous rain and 7 inches of precipitation.
Slope failures were beginning to develop by February 15 and then very high-intensity rainfall
occurred on February 16. As much as 8 inches of rain fell in a six-hour period in many locations.
Records and personal observations in the field on February 16 and 17 showed that the mountains
and slopes literally fell apart on those two days.
• 1983 San Clemente, Orange County. The damage to California Highway 1 was estimated at $65
million in 2000 dollars. Litigation at that time involved approximately $43.7 million (2000
dollars).
• 1994 Northridge, California Earthquake Landslides. As a result of the magnitude 6.7
Northridge, California, earthquake, more than 11,000 landslides occurred over an area of 10,000
km2. Most were in the Santa Susana Mountains and in mountains north of the Santa Clara River
Valley. They destroyed dozens of homes, blocked roads, and damaged oil-field infrastructure. It
caused deaths from Coccidioidomycosis (valley fever) the spore of which was released from the
soil by the landslide activity and blown toward the coastal populated areas.
• March 1995 Los Angeles and Ventura Counties, Southern California. Above normal rainfall
triggered damaging debris flows, deep-seated landslides, and flooding. Several deep-seated
landslides were triggered by the storms,the most notable was the La Conchita landslide, which in
combination with a local debris flow, destroyed or badly damaged 11 to 12 homes in the small
town of La Conchita, about 20 km west of Ventura. There also was widespread debris-flow and
flood damage to homes, commercial buildings, and roads and highways in areas along the Malibu
coast that had been devastated by wildfire 2 years before.
• 1998 Laguna Niguel, Orange County, Landslide. During the 1997/1998 El Nino Season, heavy
rainfall increased movement on the site of an ancient landslide in Laguna Niguel. The storms in
December 1997 had accelerated its movement and in early 1998, a crumbling hillside forced the
evacuation of 10 hilltop homes and more than 10 condominium units resting below. Ultimately
four of the hilltop homes collapsed, falling down hillside into the void created by the slide area.
The condominium complex has since been demolished and the site remains open space.
Final August 2019 3-53
SECTION THREE Risk Assessment
• 2005 Blue Bird Canyon, Laguna Beach, Orange County; Landslide. On June 1, 2005, Bluebird
Canyon in Laguna Beach experienced a landslide. Exceptionally heavy rainfall during the winter
period was the underlying cause of the instability in an ancient landslide. A 30-acre piece of
hillside between 50 to 60 feet deep broke free and fell on the homes below; 15 homes were
destroyed, and 32 others had varying levels of damage. The approximate cost of damage was
about$35 million.
• 2005 SCWD Landslide Impact to the Joint Regional Transmission Line. Following a year of
heavy rainfall, a slope failure occurred in Laguna Niguel in an area that included a section of the
Joint Regional Transmission Pipeline. The pipeline had to be shut down and a temporary pipeline
was routed around the slide area while evaluations of the stability of the area were made.
Ultimately, the pipeline will be rerouted around the unstable area or located back in the slope
after it has stabilized. Because the problem occurred in the winter/spring period and there are
other pipelines into South Orange County,no water shortages were experienced.
• 2018 Cannon Clie(f, Dana Point, Orange County; Rockslide. Approximately 18 tons of rocks,
including a two-ton boulder dropped from the cliff area under Cannons Restaurant and struck a
public restroom across from Baby Beach at the north end of Dana Point Harbor. The rocks are
part of a four-to -five-million-year-old rock formation called the Capistrano Formation.
Rain induced landslides were reported in Santa Margarita in 1980, 1993, 1995 and 2005. In 1980 rains
washed out an access road in Coto De Caza uncovering an 8-inch water line. The same series of storms
also exposed a 21-inch trunk sewer line along the Oso Creek in Mission Viejo resulting in damages of
$300,000. In 1993 bank failures caused many pipelines to break which had to be replaced, relocated, or
re-protected at a cost of nearly 2.1 million dollars. A slope failure in 1995 caused pipeline failures
costing nearly $30,000 and in 2005 a reservoir slope failure in Talega Valley cost $350,000. Landslides,
resulting in erosion along Aliso Creek, affected the South Orange County Water Authority's Aliso Creek
Effluent Transmission Main(a 36-inch pipeline carrying treated wastewater).
3.2.10.3 Location/Geographic Extent
Figure 3-10 illustrates the portions of the planning area susceptible to landslides based upon topography,
surface and subsurface geology, borehole data, historical ground-water levels, existing landslide features,
slope gradient, rock-strength measurements, geologic structure, and probabilistic earthquake shaking
estimates. These areas are primarily comprised of the southern coastal communities and the communities
containing steeper topography or located adjacent to mountain areas.
The extent of landslides/mudflows varies throughout the County depending upon the location and
contributing conditions, such as an earthquake, heavy rain or recent fires. Earthquake-induced landslides
are relatively shallow falls and slides, in which highly disrupted masses of rock and soil travel down
slopes at high speed. The Northridge earthquake, in Los Angeles County, triggered more than 11,000
landslides in an area of 6,200 square miles. Most slides were shallow,brittle failures of surficial rock and
soil.
Deep-seated landslides are triggered by cumulative rainfall during long periods (weeks to years).
Resulting landslides are relatively deep earth flows and translational or rotational earth slides and rock
slides. Translational landslides are typically a few meters to tens of meters deep, and rotational slides
range in depth from several meters to tens of meters. Deep-seated translational and rotational landslides,
including rock slides, tend to fail a little at a time and move more slowly than debris flows, but a few do
Final I August 2019 3-54
SECTION THREE Risk Assessment
accelerate to rapid movement. A previous landslide within the County due to over saturated soils resulted
in a 40-foot landslide below a five-million-gallon water tank. Other landslides in the county have
measured approximately 3.5 acres and 25 acres.
Similarly, short-duration, intense rainfall, generally greater than 0.5-inch per hour has the potential to
trigger post-fire debris flows. These flows can extend several miles. Documented debris flows from
burned areas in southern California and the western United States have ranged in volume from as small as
600 cubic meters to as much as about 300,000 cubic meters. This larger volume is enough material to
cover a football field with mud,rocks, and debris to about 65 meters deep.
3.2.10.4 Magnitude/Severity
Factors included in assessing landslide magnitude/severity include population and property distribution in
the hazard area, the frequency of landslide or debris flow occurrences, slope steepness, soil
characteristics, and precipitation intensity. The California Geological Survey landslide maps prepared as
part of the Seismic Hazard Program (refer to Figure 3-10) indicate the extent of landslide susceptibility
within the County, which includes the southernmost coastal areas and eastern areas of the County. These
areas would also be more likely to experience mudflows due to the topography of the areas.
Final I August 2019 3-55
SECTION THREE Risk Assessment
Figure 3-10
Landslide Susceptibility
San Bernardino
County
Los Angeles o,-pC,,- Rene -.
County
ruE Enmr+ rare anrecr , _,�
f1 Z .;�
u� t � Riverside County
- ' r
noce ea 1
seaEeEnc« T-
\ y
�.,
min,
9ERVCE os� Ere ����.'�� Ga �N_atF wlp�
Water Districts Infrastructure
0 Reservoirs i
MET Diemer Filtration Plant
Water Treatment Plant
Wastewater Treatment Plant
Potable Local
MET/Joint Agency Pipe Lines
San Diego County
—Local Sewer Lines
Regional Sewer Lines
Outfall Lines Landslide s \
—• Force Mains
Hazard w+e
Water Agency Boundary Landslide Hazard 0 zs 5 10
1
MN es
ORANGE COUNTY
POTABLE AND WASTEWATER INFRASTRUCTURE
Final I August 2019 3-56
SECTION THREE Risk Assessment
3.2.10.1 Probability of Future Occurrences
A study conducted by Nature Geoscience in 2015 indicated that the projected upsurge of El Nino and La
Nina events will increase the likelihood that coastal communities will experience erosion and flooding.
This is separate from sea level rise, which has also been identified as a cause of future hazard
vulnerabilities. In addition to erosion and flooding, the onset of El Nino and La Nina events will also
increase the magnitude and severity of mudflow events. The more recent wildfires also contribute to the
probability of mudflows in the event of more intense rainfall over a short duration. Earthquakes of
magnitude 4.0 and greater have been known to trigger landslides. The potential for an earthquake to
induce a landslide is highly dependent upon the location of the earthquake and magnitude in relation to a
landslide area. Based on previous landslide and mudflow incidents, along with studies predicting future
occurrences, it is reasonable to state that these hazards will continue to impact the jurisdictions identified
within the landslide susceptibility areas of the County. According to the Planning Team ranking,
landslides and mudflows are somewhat likely—having between a 1% and 10%probability in next year or
a recurrence interval of 11 to 100 years.
3.2.11 Tsunami
3.2.11.1 Description (Nature) of the Hazard
The phenomenon we call "tsunami" is a series of traveling ocean waves of extremely long length
generated primarily by earthquakes occurring below or near the ocean floor. In the deep ocean, the
tsunami waves move across the deep ocean with a speed exceeding 500 miles per hour, and a wave height
of only a few inches. Tsunami waves are distinguished from ordinary ocean waves by their great length
between wave crests, often exceeding 60 miles or more in the deep ocean, and by the time between these
crests,ranging from 10 minutes to an hour.
As they reach the shallow waters of the coast, the waves slow down, and the water can pile up into a wall
of destruction up to 30 feet or more in height. The effect can be amplified where a bay, underwater
features, or harbor or lagoon funnels the wave as it moves inland. Large tsunamis have been known to
rise over 100 feet. Even tsunamis one to three feet high can be very destructive and cause many deaths
and injuries.
There are many causes of tsunamis, but the most prevalent is earthquakes. In addition, landslides,
volcanic eruptions, explosions, and even the impact of meteorites can generate tsunamis. Not all
earthquakes generate tsunamis. To generate a tsunami, the fault where the earthquake occurs must be
underneath or near the ocean and cause vertical movement of the sea floor over a large area, hundreds or
thousands of square miles. By far the most destructive tsunamis are generated from large, shallow
earthquakes with an epicenter or fault line near or on the ocean floor. The amount of vertical and
horizontal motion of the sea floor,the area over which it occurs,the simultaneous occurrence of slumping
of underwater sediments due to the shaking, and the efficiency with which energy is transferred from the
earth's crust to the ocean water are all part of the tsunami generation mechanism. The sudden vertical
displacements over such large areas disturb the ocean's surface, displace water, and generate destructive
tsunami waves. Although all oceanic regions of the world can experience tsunamis, the most destructive
and repeated occurrences of tsunamis are in the Pacific Rim region.
Tsunami waves can travel at the speed of a commercial jet plane, over 500 miles per hour, moving from
one side of the Pacific Ocean to the other in less than a day. This great speed makes it important to be
aware of the tsunami as soon as it is generated. Scientists can predict when a tsunami will arrive at
Final I August 2019 3-5
SECTION THREE Risk Assessment
various locations by knowing the source characteristics of the earthquake that generated the tsunami and
the characteristics of the sea floor along the path to the shore from the point of origin.
Offshore and coastal features can determine the size and impact of tsunami waves. Reefs,bays, entrances
to rivers, undersea features and the slope of the beach all modify the tsunami as it converges on the
coastline. People living near areas where large earthquakes occur may find that the tsunami waves can
reach their shores within minutes of the earthquake. For these reasons, the tsunami threat to many areas
such as Alaska, the Philippines, Japan and the United States West Coast can be immediate (for tsunamis
from nearby earthquakes which take only a few minutes to reach coastal areas) or less urgent (for
tsunamis from distant earthquakes which take from three to 22 hours to reach coastal areas). When a
tsunami reaches the coastline and moves inland, the water level can rise several feet, flooding homes,
businesses and infrastructure from several thousand feet to miles inland, depending on the topography.
Scientists cannot accurately predict when earthquakes will occur, and as a result they cannot determine
exactly when a tsunami will be generated or how destructive it will be. However, past tsunami height
measurements are useful in predicting future tsunami impact and flooding limits at specific coastal
locations and communities.
U 11.2 History/Past Occurrences
Tsunamis can be categorized as Pacific-wide or "local." Typically, a Pacific-wide tsunami is generated
by a major vertical shift in the ocean floor creating a wave that includes the entire column of water that
has the potential to travel long distances. A "local" tsunami can be a component of a Pacific-wide
tsunami in the immediate area of the earthquake, or a wave that is confined to the area of generation; such
as a landslide within a bay or harbor. Worldwide, tsunamis have resulted in loss of thousands of lives,
billions of dollars in damages, and the closure of many local economies.
All of the coastal areas in Orange County are susceptible to tsunamis, although most tsunamis have
occurred in Northern California. The Channel Islands were impacted by a tsunami in the early 1800s. In
the 1930s, four tsunamis struck the Los Angeles, Orange County, and San Diego coastal areas. In Orange
County the tsunami wave reached heights of approximately 20 feet above sea level. In 1964, following
the Alaska 8.2 earthquake, tidal surges of approximately 4 feet to 5 feet battered Huntington Harbor
causing moderate damages.
According to the OCSD Emergency Management Division, two events generated response by their
office:22
• April 1, 2014. An 8.2 earthquake off the coast of Chile had the potential to generate a tsunami
that could impact the Orange County coastline. The event was monitored, but no watch,
advisory, or warning was issued for the County.
• September 16, 2015. An 8.3 earthquake off the coast of Chile triggered a Tsunami Advisory for
the Orange County coastline. The Orange County EOC was activated and beaches were closed as
a precaution; no evacuation orders were issued, and no damages occurred.
The National Oceanic and Atmospheric Administration reports one tsunami event in Orange County:23
22 Ethan Miller Brown,OCSD Emergency Management Division,email correspondence,September 5,2017.
Final I August 2019 3-58
SECTION THREE Risk Assessment
• September 16-17, 2015. As described above, an 8.3 magnitude earthquake off the coast of Chile
led the National Tsunami Warning Center to issue a tsunami advisory for a portion of California,
including Orange County. All beaches, harbors, piers, and marinas in the Cities of Seal Beach,
Huntington Beach, Newport Beach, Laguna Beach, Dana Point and San Clemente, including
County and State beaches were closed. Tsunami wave heights were observed to be just under one
foot along the Orange County coast. The Orange County EOC reported no significant coastal
flooding, but to be aware of the high likelihood of strong currents and waves dangerous to
persons in or near the water.
3.2.11.3 Location/Geographic Extent
Figure 3-11 illustrates the portions of the planning area within a tsunami hazard zone. Tsunami
inundation maps are provided by the California Geological Survey and represent a combination of the
maximum considered tsunamis for each area.
As illustrated on Fi�ztire 3-11, tsunami inundation areas are contained to the coastal areas of the planning
area, extending into areas of Seal Beach, Huntington Beach,Newport Beach, Laguna Beach, Dana Point,
and San Clemente.
3.2.11.4 Magnitude/Severity
The magnitude/severity of a tsunami would be dependent upon the severity and location of the event
causing the tsunami. The California Geological Survey tsunami inundation maps (refer to Figure 3-11)
identify the maximum extent of the tsunami inundation area within the County, which is primarily
contained to the coastline. However, the inundation areas extend into several coastal communities with
the largest potential inundation areas occurring within the cities of Seal Beach, Huntington Beach,
Newport Beach, and Dana Point.
3.2.11.5 Probability of Future Occurrences
The historic record indicates that there is a low probability of occurrence of a major tsunami in Orange
County. However, there is the potential for future tsunami events to impact water and wastewater
infrastructure located within a tsunami inundation area. This probability is similar for each of the
jurisdictions located within these areas.
13 National Oceanic and Atmospheric Administration,National Centers for Environmental Information,Storm Events
Database, Event Types: Tsunami,https://www.ncdc.noaa.gov/stormevents/choosedates.jsp?statefips=6,CALIFORNIA, accessed
March 21,2018.
Final I August 2019 3-59
SECTION THREE Risk Assessment
Figure 3-11
Tsunami Hazard Zones
San Bernardino
County
Orange Conn Res, - xorvJeE�14' r
Los Angeles
County
orvMuay._ _._
Riverside County
b
rz ���'� oannrE �p 9 JY'-�•�_''i
y cpn ff N a II
. � ' � •,l
sear aeaew aN �-LT
co
s—r1 Pl it
C� V'Ne x n srinet qcY- -
ra a M A
rvi p Era
/
�A=(p any—Raae—;. f s..
�
( V
Water Districts Infrastructure 1
0 Reservoirs
Rasc `I
� MET Diemer Filtration Plant
Water Treatment Plant t s a p s
Re a
Wastewater Treatment Plant WteR°sr^°
Potable Local
MET/Joint Agency Pipe Lines Sc 1,9,1
orr San Diego County
-Local Sewer Lines
Regional Sewer Lines
—Outfall Lines Tsunami Hazard N
---Force Mains Zones w+E
Agency Boundary 8
WaterA
g y ry - Tsunami Hazard o as s
,o \
I I
Was
ORANGE COUNTY
POTABLE AND WASTEWATER INFRASTRUCTURE
Final I August 2019 3-60
SECTION THREE Risk Assessment
3.2.12 Wildland/Urban Fire
3.2.12.1 Description (Nature) of the Hazard
A variety of fire protection challenges exist within Orange County, including structure fires, urban fires,
wildland fires, and fires at the wildland/urban interface. This hazard analysis focuses on wildland fires,
but also addresses issues specifically related to the wildland/urban interface. There are three categories of
interface fires: the classic wildland/urban interface exists where well-defined urban and suburban
development presses up against open expanses of wildland areas, the mixed wildland/urban interface is
characterized by isolated homes, subdivisions and small communities situated predominantly in wildland
settings, and the occluded wildland/urban interface existing where islands of wildland vegetation occur
inside a largely urbanized area. Certain conditions must be present for significant interface fires to occur.
The most common conditions include: hot, dry and windy weather, the inability of fire protection forces
to contain or suppress the fire, the occurrence of multiple fires that overwhelm committed resources, and
a large fuel load (dense vegetation). The three primary factors that lead to severe wildfires in Orange
County are drought, insect infestation causing tree decimation (bark beetles), and wildfire suppression.
Once a fire has started, several conditions influence its behavior, including fuel topography, weather,
drought, and development.
A key challenge Orange County faces regarding the wildfire hazard is the increasing number of houses
being built in the wildland/urban interface. Every year the growing population has expanded further and
further into the hills and mountains, including forest lands. The increased "interface" between
urban/suburban areas and open space areas has produced a significant increase in threats to life and
property from fires and has pushed existing fire protection systems beyond original or current design and
capability.
3.2.12.2 History/Past Occurrences
Although no federally-declared wildfire disasters have occurred in Orange County, significant wildfires
have impacted the County and surrounding areas. Since 1950, the National Oceanic and Atmospheric
Administration reports 28 wildfire events occurring with Orange County. Table 3-11, Major Wildfires,
identifies significant fires that have occurred since 1950.
Final I August 2019 3-61
SECTION THREE Risk Assessment
Table 3-11
Major Wildfires
Date Location Description
Hot temperatures and dry conditions allowed a brush fire to quickly race up hill and
8/22/2000 San Clemente ignite the underside of two roofs. Fifteen families were evacuated as more than 40
firefighters worked for several hours to control the blaze.
9/11/2000 San Clemente A wild fire was fanned by east winds and burned 500 acres before being contained.
8/7/2001 Laguna Beach A wild fire in a steep canyon near the main toll plaza on the San Joaquin Hills Toll
Road(Highway 73).
9/9/2001 El Toro A brush fire burned 30 acres before it was brought under control.
1/23/2002 Trabuco Santa Ana winds gusted between 60 to 70 mph for several days across Southwest
California.
Extremely dry conditions, above normal temperatures, and gusty winds, helped a
brush fire, started by an arsonist, to quickly consume 1100 acres before being
5/13/2002 Mission Viejo controlled. Two trucks and one structure were destroyed. Many residential homes
suffered smoke damage and residents were evacuated. Traffic was halted on
Highway 241. No injuries occurred.
Santa Ana Winds and Red Flag conditions resulted in the rapid spread of a wildfire
2/6-12/2006 in the Santa Ana mountains. Named the Sierra Fire, this fire burned 10,854 acres
from Sierra Peak to the 241 Toll Road. While evacuations were ordered, no
structures were burned. Eight minor injuries were reported.
The Windy Ridge Fire was intentionally set during the early stages of a red flag
event at the mouth of Fremont Canyon. Humidity values less than 10% and wind
gusts in excess of 40 mph caused the fire to spread quite rapidly across the rain
Santa Ana Mountains starved hillsides. At the time of the fire, the Santa Ana Fire Station had only
3/11-14/2007 measured 1.81 inches of rain on the season, nearly 9 inches below the average
and Foothills rainfall for that date. Mandatory evacuations were posted for 1200 homes in
Anaheim Hills and Orange as the wind-driven fire spread westward. The fire
burned 2036 acres, damaged one home, and destroyed two out-structures before it
was extinguished.
Santa Ana Mountains The Santiago Fire was intentionally set and burned 28,400 acres in Modjeska and
10/21/2007 Santiago Canyons. The fire destroyed 15 homes and 9 outbuildings. An additional
and Foothills 20 structures were damaged. Sixteen firefighters were inured during the blaze.
Final I August 2019 3-62
SECTION THREE Risk Assessment
Table 3-11 [continued]
Major Wildfires
Date Location Description
The Long Canyon fire started in the Cleveland National Forest in eastern Orange
County, west of the Ortega Highway near the Riverside County line. Some
9/23/2010 Santa Ana Mountains structures were threatened, but the fire generally burned away from the populated
and Foothills areas, 40 acres total. Three firefighters and one police officer suffered non-life-
threatening heat-related and smoke inhalation injuries. One of the Cleveland
National Forest's fire engines was destroyed by fire,cause unknown,no injuries.
The Falls Fire started off Ortega Highway near Decker Canyon, in Riverside. Due
to the fire burning on the Trabuco Ranger District, the San Mateo Wilderness, El
Cariso Campground, Blue Jay Campground, the Firefighter Memorial Picnic Area
Santa Ana Mountains and Wildomar OHV area were closed. Road closures included Ortega Hwy 74 from
8/5/2013 and Foothills Lake Elsinore west to San Antonio Parkway. Evacuations were ordered for
Lakeland Village, Rancho Capistrano and Decker Canyon residents. Evacuation
perimeter was between Grand/Ortega and Grand/Corydon. No structures were
threatened and no injuries. Minor guardrail damage occurred because of a rock fall
along Ortega Highway. The fire burned 1416 acres before being fully contained.
The Silverado Fire began along Silverado Canyon Road in the Cleveland National
Forest of the Santa Ana Mountains. The fire burned at a critical rate of spread,
threatening power lines and forcing evacuations and road closures. Mandatory
Evacuations were ordered from 30331 Silverado Canyon east to the end of the road
9/12-13/2014 Santa Ana Mountains (fire gate) and included 50 residences affecting approximately 220 people. The
and Foothills American Red Cross opened an evacuation center at 1530 at El Modena High
School at 3920 East Spring Street. The 12kV line servicing Silverado residents was
down. One pole and the downed lines required replacement. There were 71
customers without power in Silverado Canyon. After burning a total of 1600 acres,
the Silverado Fire was completely contained.
The Canyon fire began near Highway 91 in Orange County. The fire spread rapidly
due to dry fuel conditions and very low humidity, and firefighting efforts were
Santa Ana Mountains hindered by a transition from light Santa Ana Winds to onshore flow. This initially
9/25/2017 pushed the fire into the foothills before sending it back eastward toward Corona.
and Foothills The fire was estimated at 1700+ acres and was threatening residences. Winds
calmed over the ensuing days and the fire was quickly contained at 2662 acres.
The cause of the wildfire was determined to be a roadside flare.
The Canyon 2 fire began near the 91 Freeway and Gypsum Canyon Road in
Anaheim Hills. The fire spread rapidly threatening numerous structures. In the first
1019/2017 Orange County Inland 24 hours the fire consumed more than 7,000 acres. In total, 25 structures were
destroyed, 55 were damaged and 9,217 acres burned. Four injuries were also
reported. The cause of the fire was reported to be embers from the Canyon Fire
which began September 25 and was contained October 4,2017.
National Oceanic and Atmospheric Administration, National Centers for Environmental Information, Storm Events Database, Event Types:
Wildfire,htt s://www.ncdc.noaa. ov/stormevents/choosedates.s ?statefi s=6,CALIFORNIA,accessed March 21,2018.
Final I August 2019 3-63
SECTION THREE Risk Assessment
At 9:01 am on November 15, 2008 the Corona Fire Department responded to calls reporting a brush-fire
in Riverside County. Upon arrival it became apparent to first responders the fire would be significant and
of a highly destructive nature. At the time of the alarm a Red-Flag Warning had been in effect due to
low-humidity levels, high temperatures, and strong Santa Ana winds. These conditions along with the
terrain of the areas burned facilitated the rapid growth and spread of the fire and significantly affected
first responder's efforts of containment and in the protection of property and lives. Initial calls reported
the fires location as west of the Green River exit off the 91 Freeway in Riverside County. From there the
fire quickly advanced in a Northwesterly direction towards Orange County where the fire split into two
separate branches shortly after crossing over the county line;the first branch of the fire followed the Santa
Ana river basin southwest into Anaheim hills, and the second continued northwest into Yorba Linda.
Both branches of the fire became of concern to the water utilities of Orange County as the fire threatened
infrastructure or moved into the service areas of Anaheim, Brea, the Yorba Linda Water District, and
MET's Diemer Filtration Plant facility. Eventually, the fire burned through approximately 30,305 acres
and damaged or destroyed over 300 structures in Riverside, San Bernardino, Los Angeles, and Orange
Counties.
A brush fire erupted along State Route 241 near Santiago Canyon Road in Irvine on the morning of July
13, 2015. Campgrounds near Irvine Lake were evacuated, and three abandoned structures caught fire.
The blaze encompassed a total of approximately 214 acres. Around one year later, a fire occurred in the
Laguna Coast Wilderness Park near Bommer Ridge Trail on June 26, 2017. The fire burned
approximately 47 acres and was reported as contained on June 27, 2017. On August 31, 2016, the Holy
Fire started in the early morning just east of Trabuco Canyon in the Cleveland National Forest. The blaze
did not threaten any homes; however, it was in an area around Holy Jim Canyon that was difficult for
firefighters to reach. The fire burned through approximately 150 acres.
3.2.12.3 Location/Geographic Extent
Cal Fire prepares fire hazard severity maps including mapping areas of significant fire hazards based on
fuels,terrain, weather, and other relevant factors. These zones,referred to as Fire Hazard Severity Zones
(FHSZ), define the application of various mitigation strategies and influence how people construct
buildings and protect property to reduce risk associated with wildland fires. According to Figure 3-12,
the southern and eastern portions of the County are located within High and Very High Fire Severity
Zones.
3.2.12.4 Magnitude/Severity
California experiences large, destructive wildland fires almost every year and Orange County is no
exception. Wildland fires have occurred within the County, particularly in the fall, ranging from small,
localized fires to disastrous fires covering thousands of acres. The most severe fire protection problem is
wildland fire during Santa Ana wind conditions. These conditions have been further exacerbated by more
recent drought conditions. Drought causes fuels (both live and dead vegetation) to dry out and become
more flammable increasing the probability of ignition along with the rate of fire spread. If drought
continues for an extended period,the number of days with elevated probability of ignition and fire spread
increases, raising the risk of widespread burning. The combination of drought conditions, need to
maintain water fire flow and the potential for power failure due to Santa Ana wind conditions can impact
the magnitude and severity of fires within the planning area.
Final I August 2019 3-64
SECTION THREE Risk Assessment
Figure 3-12
Fire Hazard Severity Zones
San Bernardino
County
Los Angeles Orange Co Re
County
BR
r�„Ex,� � p sEwE�En 9?urm�am �
aenu
uI J - Riverside County
wxK
trILT EAST °
aoaN6eT IIIA.
- —�
—I.T.1L-- 'i
°
a NESa
eaxiTa°V OIeTRI[l
i.
Alw `®
� R�nvao- r
Water Districts Infrastructure
0 Reservoirs
0 MET Diemer Filtration Plant s
11
Water Treatment Plant it
Wastewater Treatment Plant w°
Potable Local �S
MET/Joint Agency Pipe Lines Fire Hazard San Diego County
-Local Sewer Lines Severity Zones q
Regional Sewer Lines
-Outfall Lines Moderate N \
--Force Mains High w+E
s
O Water Agency Boundary Very High o a.s 5 10
MNes
ORANGE COUNTY
POTABLE AND WASTEWATER INFRASTRUCTURE
Final I August 2019 3-65
SECTION THREE Risk Assessment
The magnitude/severity of a wildfire would be dependent upon the location and conditions (e.g., Santa
Ana winds) in place at the time. The Fire Hazard Severity Zone maps prepared by Cal Fire (refer to
Figure 3-12) identify the extent and severity of the fire hazard zones within the County. Although a fire
could start and/or extend beyond these areas, they identify the areas of severity so that measures can be
identified to mitigate the rate of spread and reduce the potential intensity of uncontrolled fires that
threaten to destroy resources, life, or property.
3.2.12.5 Probability of Future Occurrences
Wildfires are a regular feature of many of California's ecosystems, and will continue to be in the future.
Since the northern, eastern, and southern portion of the County are considered wildland/urban interface
areas, the County has a higher probability of wildfire risks in those communities and surrounding areas.
The specific chance of wildfire in the County's wildland/urban interface is not known, but the general
vulnerability of the area to fires means that there is a reasonable possibility such an event will occur.
According to the Planning Team and based on conditions experienced within the last several years, the
probability of the County experiencing wildfires is highly likely—near 100%probability in the next year
or happens every year.
3.2.13 Human-Caused Hazards
3.2.13.1 Description (Nature) of the Hazard
Human-caused hazards are distinct from natural hazards in that they result directly from the actions of
people. Two types of human-caused hazards include: non-malicious and malicious. Non-malicious
hazards refer to incidents that can arise from human activities such as the manufacturing, storage,
transport, and use of hazardous materials, which include toxic chemicals, radioactive materials, and
infectious substances. Non-malicious hazards are assumed to be accidental and their consequences
unintended. Malicious, on the other hand, encompasses intentional and criminal acts involving weapons
of mass destruction (WMD) or conventional weapons. WMD can involve the deployment of biological,
chemical, nuclear, and radiological weapons with the result of affecting a significant percentage of the
population either directly or indirectly. Conventional weapons and techniques include the use of arson,
incendiary explosives, armed attacks, intentional hazardous materials release, and cyber-terrorism(attack
via computer). Typically, conventional weapons have a very specific target and are limited in scope and
affect.
Hazardous materials can include toxic chemicals, radioactive materials, infectious substances, and
hazardous wastes. The State of California defines a hazardous material as a substance that is toxic,
ignitable or flammable, or reactive and/or corrosive. An extremely hazardous material is defined as a
substance that shows high acute or chronic toxicity, carcinogenicity, bio-accumulative properties,
persistence in the environment, or is water reactive (California Code of Regulations, Title 22).
"Hazardous waste," a subset of hazardous materials, is material that is to be abandoned, discarded, or
recycled, and includes chemical, radioactive, and bio-hazardous waste (including medical waste). An
accidental hazardous material release can occur wherever hazardous materials are manufactured, stored,
transported, or used. Such releases can affect nearby populations and contaminate critical or sensitive
environmental areas. With respect to water or wastewater systems, concerns arise regarding exposure to
these materials via contact or ingestion of drinking water and or discharge of contaminated water into the
ocean where exposure to the marine environment and public would be of concern.
Final I August 2019 3-66
SECTION THREE Risk Assessment
NON-MALICIOUS HAZARDS
Non-malicious hazards can occur because of human carelessness, technological failure, and natural
hazards. When caused by natural hazards, these incidents are known as secondary hazards, whereas
intentional acts are terrorism. Hazardous materials releases, depending on the substance involved and
type of release, can directly cause injuries and death and contaminate air, water, and soils. While the
probability of a major release at any facility or at any point along a known transportation corridor is
relatively low,the consequences of releases of these materials can be very serious.
The most common sources of contamination to water supply systems are naturally occurring chemicals
and minerals (i.e., arsenic, radon, and uranium), local land use practices (i.e., fertilizers and pesticides),
manufacturing processes, sewer overflows, and malfunctioning wastewater treatment systems(i.e.,nearby
septic systems). Although these contaminants present an environmental and human health risk concern,
the EPA holds regulations in place to ensure water supply systems do not contain elevated levels of
contaminants.
Some hazardous materials also present a radiation risk. Radiation is any form of energy propagated as
rays, waves or energetic particles that travel through the air or a material medium. Radioactive materials
(e.g.,uranium,plutonium,radium, and thorium)are composed of unstable atoms. An unstable atom gives
off its excess energy until it becomes stable. The energy emitted is radiation. The process by which an
atom changes from an unstable state to a more stable state by emitting radiation is called radioactive
decay or radioactivity.
Radiological materials have many uses including:
• Use by doctors to detect and treat serious diseases,
• Use by educational institutions and companies for research,
• Use by the military to power large ships and submarines, and
• Use as a critical base material to help produce the commercial electrical power that is generated
by a nuclear power plant.
Radioactive materials, if handled improperly, or radiation accidentally released into the environment, can
be dangerous because of the harmful effects of certain types of radiation on the human body and the
human environment. The longer a person is exposed to radiation and the closer the person is to the
radiation source, the greater the risk. Although radiation cannot be detected by the senses, scientists can
easily detect it with sophisticated instruments that can detect even the smallest levels of radiation. Under
extreme circumstances, an accident or intentional explosion involving radiological materials can cause
very serious problems. Consequences may include death, severe health risks to the public, damage to the
environment, and extraordinary loss of,or damage to,property.
TERRORISM
Following several serious international and domestic terrorist incidents since the early 2000s, citizens
across the United States have paid increased attention to the potential for deliberate, harmful terrorist
actions by individuals or groups with political, social, cultural, and religious motives. There is no single,
universally accepted definition of terrorism, and it can be interpreted in a variety of ways. However,
terrorism is defined in the Code of Federal Regulations as "...the unlawful use of force and violence
against persons or property to intimidate or coerce a government, the civilian population, or any segment
thereof, in furtherance of political or social objectives" (28 CFR, Section 0.85). The Federal Bureau of
Final I August 2019 3-67
SECTION THREE Risk Assessment
Investigation further characterizes terrorism as either domestic or international, depending on the origin,
base, and objectives of the terrorist organization. However, the origin of the terrorist or person causing
the hazard is far less relevant to mitigation planning than the hazard itself and its consequences.
Terrorists can utilize a wide variety of agents and delivery systems.
Water supplies and infrastructure, such as dams, in Orange County are considered as potential terrorist
targets. The weapon most likely used could include explosives with the goal of collapsing the dam. Such
an event would result in a dam failure and an inundation event with little or no warning. The potential of
using other types of weapons such as chemical or biological are considered low due to the large amount
of material that would be required to contaminate the water system. This scenario would only apply to
those dams where the reservoirs are used for drinking water.
Another very significant concern is cyber terrorism. All of Orange County's water utilities utilize
Supervisory Control and Data Acquisition systems (SCADA), which operate over telecommunication
lines and/or radio systems. These systems are vulnerable to hacking and leave utilities open to malicious
acts.
3.2.13.2 History/Past Occurrences
HAZARDOUS MATERIAL RELEASES
Numerous facilities in Orange County generate hazardous wastes in addition to storing and using large
numbers of hazardous materials. Although the scale is usually small, emergencies involving the release
of these substances can occur daily at both fixed sites and on the County's streets and roadways.
Facilities that use, manufacture, or store hazardous materials in California must comply with several state
and federal regulations. The Superfund Amendments and Reauthorization Act (SARA Title III), which
was enacted in 1986 as a legislative response to airborne releases of methyl isocyanides at Union Carbide
plants in Bhopal, India and in Institute, West Virginia. SARA Title III, also known as the Emergency
Planning and Community-Right-To-Know Act (EPCRA), directs businesses that handle, store or
manufacture hazardous materials in specified amounts to develop emergency response plans and report
releases of toxic chemicals. Additionally, Section 312 of Title III requires businesses to submit an annual
inventory report of hazardous materials to a state-administering utility. The California legislature passed
Assembly Bill 2185 in 1987, incorporating the provisions of SARA Title III into a state program. The
community right-to-know requirements keep communities abreast of the presence and release of
hazardous wastes at individual facilities.
Additional information about the chemicals handled by manufacturing or processing facilities is contained
in the U.S. EPA's Toxic Release Inventory(TRI) database. The TRI is a publicly available EPA database
that contains information on toxic chemical emissions and waste management activities reported by
certain industry groups as well as federal facilities. This inventory was established under EPCRA and
expanded by the Pollution Prevention Act of 1990. Facilities that exceed threshold emissions levels must
report TRI information to the U.S. EPA,the federal enforcement agency for SARA Title 111.
Over the past several decades industrial activities have contaminated Orange County's North Basin,
which provides much of the water used in 22 Orange County cities, including parts of Fullerton,
Anaheim, and Placentia. Over five square miles of contaminants, mostly volatile organic compounds
(VOCs), have migrated through the soils and are now leaching into the underlying groundwater. These
VOCs have impacted nearby water supply wells causing four of them to be taken out of service. The
Orange County Water District (OCWD), under EPA oversight, is currently conducting an interim
remedial investigation and feasibility study to determine the extent of groundwater contamination.
Final I August 2019 3-68
SECTION THREE Risk Assessment
Chemical air emissions, surface water discharges, underground injections, and releases to land are
considered chemical releases. The release of a biological agent capable of causing illness in people is
considered an infectious release. The only known release of radiological agents into the air in the County
was the result of an accident at San Onofre Nuclear Generating Station(SONGS). In 1981, an accidental
"ignition"of hydrogen gases in a holding tank of the SONGS caused an explosion which bent the bolts of
an inspection hatch on the tank, allowing radioactive gases in the tank to escape into a radioactive waste
room. From there, the radioactive material was released into the atmosphere. The plant was shut down
for several weeks following the event (W.I.S.E. Vol.3 No.4 p.18). This incident occurred during the
plant's operation of its Unit 1 generator, which has since been decommissioned. No serious injuries
occurred.
On February 3, 2001, another accident occurred at SONGS when a circuit breaker fault caused a fire that
resulted in a loss of offsite power. Published reports suggest that rolling blackouts during the same week
in California were partially due to the shutdown of the SONGS reactors in response to the 3-hour fire.
Although no radiation was released, and no nuclear safety issues were involved, the federal Nuclear
Regulatory Commission sent a Special Inspection Team to the plant site to investigate the accident.
In June 2013, SONGS permanently closed after faulty replacement steam generators were installed at the
nuclear facility. SONGS is currently undergoing the process to decontaminate and dismantle the nuclear
facility. As of August 2017, a court settlement requires the operators of SONGS, Southern California
Edison (SCE), to relocate the 3.55 million pounds of nuclear waste to another facility. Among the
possible sites is the Palo Verde Nuclear Generating Station in Arizona, located approximately 330 miles
away. Transportation of nuclear waste poses an environmental and human health risk concern if radiation
is released into the environment.
TERRORISM
While Orange County has not experienced any high-profile attacks by groups or individuals associated
with international terrorist organizations, Orange County has several groups for advisory notification,
investigation, and analysis of terrorist events and activities. These groups include:
• Orange County Joint Terrorism Task Force (OCJTTF): The OCJTFF was formed by the Orange
County Sheriff's Department teamed with the FBI and other local police agencies. The OCJTTF
is one of sixty-six JTTF's across the United States and the 3' largest in the nation. Team
members are tasked with collecting, analyzing, and sharing critical information and intelligence
involving matters related to any terrorism investigation occurring in or affecting the Orange
County area.
• Orange County Private Sector Terrorism Response Group (PSTRGj: The PSTRG was formed in
December 2001 to create a private sector partnership with the Terrorism Early Warning Group to
effectively address private sector safety, incident management, employee education and public
health consequences of potential attacks on the critical infrastructure within Orange County. Two
large groups involved with PSTRG are the Orange County Business Council, of which 80% of
the major businesses in Orange County are members, and TechNet, a consortium of 28 high-tech
firms. The objectives of the PSTRG include physical resource sharing, information exchange,
virtual reach-back capabilities, and subject/industry matter experts cross-utilization. The PSTRG
is an instrument which allows the Sheriffs Department to maximize all resources and prepare
community members for the potential of terrorism and recovery in its aftermath.
Final August 2019 3-69
SECTION THREE Risk Assessment
• Orange County Intelligence Assessment Center (OCIAC : The OCIAC was built on the
foundation established by the Orange County Sheriff Department's Terrorism Early Warning
Group (TEWG) from 2001 to 2007 and is an Operational Area asset governed by the Orange
County Chiefs and Sheriff's Association (OCCSA). The OCIAC is a proactive multi-agency,
multi-discipline collaborative which provides comprehensive analysis, intelligence, timely
information sharing, and infrastructure protection. Within the OCIAC, the Critical Infrastructure
Protection Unit uses a multi-disciplinary team comprised of law enforcement, fire, medical, and
private sector experts to conduct vulnerability assessments,provide relevant security updates, and
training resources to our public and private sector partners in a combined effort to protect our
county's assets against terrorist attack,criminal activity, and natural disasters.
• Law Enforcement Mutual Aid: Orange County law enforcement has long recognized the need for
standardization and uniformity of organization and response on the part of public safety providers
involved in major multi-discipline and multi jurisdictional incidents. The collaborative efforts of
Orange County law enforcement leaders over the past 53 years have forged a collective voice in
mutual assistance and mutual aid. All major components tasked with public safety (law, fire,
health, emergency management) are actively involved in developing emergency plans and
insuring emergency preparedness.
3.2.13.3 Location/Geographic Extent
Human-caused hazards may affect a specific location or multiple locations, each of which may be a
disaster scene, a hazardous scene, and/or a crime scene simultaneously. An accidental hazardous
materials release can occur wherever hazardous materials are manufactured, stored, transported, or used.
In Orange County, a hazardous material event is most likely to occur within the County's industrial areas.
One of the special considerations in dealing with the terrorist threat is that it is difficult to predict. The
Department of Homeland Security's National Planning Scenario identifies the possible terrorist strike
locations it views as most plausible; places at risk include cities that have economic and symbolic value,
places with hazardous facilities, and areas where large groups of people congregate, such as an office
building, sports arena, or amusement park. As such, Anaheim (Disneyland, Angels Stadium, Honda
Center),Buena Park(Knott's Berry Farm), and San Clemente(SONGS)are viewed as potential targets.
3.2.13.4 Magnitude/Severity
Human-caused hazards have the potential to directly impact water and wastewater systems. A hazardous
material spill could be localized and depending upon when the spill is identified and addressed, may be
contained with limited to no impact on water supplies and systems. However, there is the potential for a
hazardous material spill to severely impact water supplies due to groundwater intrusion and direct
contamination of a water source. The magnitude and severity of the hazard would be highly dependent
upon the type of hazardous material spill, location, and the extent to which the hazardous material extends
into the water system. Similarly, an act of terrorism could cause a significant impact to water and
wastewater systems depending upon the type of event and whether it occurs at a primary source or is
focused to a specific area or system. Human-caused hazards can have a direct impact on water supplies
and the ability to provide water services to communities, potentially resulting in significant health and
safety issues.
Final I August 2019 3-/0
SECTION THREE Risk Assessment
3.2.13.5 Probability of Future Occurrences
According to the Governor's Office of Emergency Services, hazardous materials have been released
approximately 250 times to the environment between the years of 2006 and 2017 in Orange County.
Thus,the probability of future contamination to the environment is likely. However,human consumption
of contaminated groundwater is unlikely due to the constant monitoring of over 700 wells across Orange
County.24
Because of the dynamic nature of the terrorist threat and the open nature of California society, all
jurisdictions within California are vulnerable to terrorist attack. One must know the minds and
capabilities of various terrorists and terrorist groups; these are characteristics terrorist organizations strive
to conceal. Because all terrorists are not the same, the calculation is even more difficult. From the
perspective of hazard mitigation, the most often used weapon of terrorists is bombs and the greatest
potential for loss is from WMDs.
3.2.14 Power Outage
3.2.14.1 Description (Nature) of the Hazard
A power outage typically occurs during a natural hazard such as extreme weather conditions, earthquakes,
flood, fire or severe winds. An outage can result in damaged power equipment or equipment failures and
can affect multiple counties for hours. This type of event can range from a moderate event to a
catastrophic regional event that may threaten human life, safety, and health, or interferences with vital
services. An outage may occur as a secondary effect of another hazard,or as the result of construction, an
accident, or terrorism. Severe winds and flood can bring down trees and tree limbs onto power lines.
And these types of events can cause serious safety hazards to the public and emergency responders.
3.2.14.2 History/Past Occurrences
Orange County has experienced many power outages in the past. There have been small to moderate
incidents, and several extreme incidents that have lasted hours in certain areas. Power outages are most
commonly seen in Southern California when Santa Ana wind conditions occur.
One of the most severe events,referred to as the 2011 Southwest Blackout,took place in September 2011.
This event affected southern Orange County, San Diego-Tijuana area, Imperial Valley, Mexicali Valley,
Coachella Valley, and parts of Arizona. The incident is known to have been an 11-minute system
disturbance which led to cascading outages and 2.7 million customers left without power, some for up to
12 hours. The hardest hit areas of San Diego-Tijuana, experienced street gridlock due to loss of traffic
signals, school and businesses closing, flights and public transportation delays, and water and sewage
pumping station power loss.
In 2013, a blackout resulted in approximately 123,000 homes and businesses losing power for several
hours. Faulty circuits affected people in a number of Orange County communities including Mission
Viejo,Laguna Niguel, Ladera Ranch, Coto De Caza, Ortega, San Clemente,Talega, San Juan Capistrano,
Dana Point, and Capistrano Beach.
24 Orange County Water District Groundwater Management Plan,2015 Update,June 17,2015.
Final I August 2019 3-/1
SECTION THREE Risk Assessment
3.2.14.3 Location/Geographic Extent
A power outage can cause impacts at the local level and potentially the regional level. As seen from
previous occurrences, a severe outage can easily impact several counties at a time. All jurisdictions
within the planning area have the potential to be impacted should an event occur; either directly or
indirectly. Highly developed communities may see more outage occurrences if a heat wave should occur,
due to the number of cooling systems running at once. Water and wastewater facilities with backup
generators or alternate power sources are less likely to experience severe losses or disruption.
3.2.14.4 Magnitude/Severity
A power outage has the potential to directly impact water and wastewater systems. Disruption of water
utilities and systems often requires notification of the public and businesses to curtail usage,boil available
water, use bottled water, etc. Firefighting capabilities may also be impacted if an outage causes
disruption to water supplies. In areas where telephone service is provided by above-ground lines that
share poles with electrical distribution lines, telecommunications providers may not be able to make
repairs to the telephone system until electrical utilities restore power lines to a safe condition. This could
impact response times to a water or wastewater incident. The impacts of electric utility disruptions are
felt most significantly by southern California communities during the summer months due to cooling
demands from higher heat. Any extended electric disruption can also lead to local economic losses when
computers, lighting, refrigeration, gas pumps, and other equipment are without power during business
hours. A severe power outage also can cause cascading impacts such as transportation incidents, civil
unrest, and disease. The magnitude/severity of a power outage would be the same for all jurisdictions
within the planning area.
3.2.14.5 Probability of Future Occurrences
Power outages are a normal part of life and are unpredictable; they happen for many reasons and can be
expected to continue in the future. Water and wastewater systems are most susceptible to failure during
extreme weather conditions, fires, and earthquake events. Regional power outages can threaten human
life, particularly when outages affect water supply, hospitals, and other healthcare facilities. As both
population and climate variability increase across southern California, and put more pressure on aging
distribution systems, it is likely that power outage events will continue to occur. Due to the nature and
extent of power outages, the probability for future occurrences would be the same for all jurisdictions in
the planning area.
3.3 VULNERABILITY ASSESSMENT
Vulnerability describes how exposed or susceptible to damage an asset is, and depends on an asset's
construction, condition, contents and the economic value of its functions. A vulnerability analysis
predicts the extent of injury and damage on the existing and future built environment that may result from
a hazard event of a given intensity in a given area. Due to the interrelatedness of water and wastewater
infrastructure and the role each have in public health and safety, vulnerabilities in one community are
often related to vulnerabilities in another. Indirect effects can be much more widespread and damaging
than direct effects. For example, damage to a major water utility line could result in significant
inconveniences and business disruption that would far exceed the cost of repairing the utility line.
Final I August 2019 3-/2
SECTION THREE Risk Assessment
The vulnerability assessment quantifies, to the extent feasible using best available data, assets at risk to
hazards and estimates potential losses. This section focuses on the risks to the planning area; data for
each of the MAs was also evaluated and is included here and in the Jurisdictional Annexes.
3.3.1 Asset Inventory
Hazards that occur in Orange County can impact critical facilities located throughout the County. For this
Plan update, a critical facility is defined as public infrastructure used to provide potable water to the
public and maintain wastewater services,necessary to maintain public health and safety. Critical facilities
associated with potable water services located within the planning area include: wells, water storage
tanks, reservoirs with dams, water treatment plants,pump stations,pressure reducing stations, emergency
interties, service connections, pipelines, and administrative buildings and utility yards; refer to Table 3-
13, Summary Assets, at the end of this section. Critical facilities associated with wastewater services
located within the planning area include: wastewater treatment plants, lift stations, pipelines, and
administrative buildings and utility yards (Table 3-13).
3.3.2 Estimating Potential Exposure and Losses
Orange County covers 948 square miles with several different climate patterns and types of terrain, from
the coast to the mountains, which allows for several hazards to affect various parts of the County, as
described above. Due to the vast area, a hazard event could impact a single jurisdiction or multiple
jurisdictions.
Updated mapping of water and wastewater infrastructure was prepared in anticipation of the Plan update.
As part of the Plan update, the infrastructure mapping was overlaid with hazards having a physical
geographic location to estimate exposure to water and wastewater infrastructure. Hazard areas and
infrastructure overlays were conducted for wildfires, flooding, fault rupture, earthquakes, liquefaction,
landslides, and tsunamis; refer also to the Jurisdictional Annexes. Hazards and infrastructure overlays
were not conducted for the remaining hazards because data for these hazards was either not available or is
not geographically distinct. Many of these hazards, such as drought,power outage, and high winds/Santa
Ana winds affect the entire planning area; therefore, all water and wastewater infrastructure could be
potentially susceptible to damage from them. For these hazards, quantitative analyses were not
performed. Vulnerability assessments associated with these hazards is based on historic incidents and the
knowledge that water and wastewater experts have of their critical facilities and the susceptibility of those
facilities to these hazards.
For water and wastewater infrastructure pipelines,the length of exposure/impact is given in miles. Other
critical facilities are identified by facility/structure type. Exposure characterizes the value of
facilities/structures within the hazard zone and is shown as estimated exposure based on the overlay of the
hazard on the critical facilities which are assigned a cost of replacement for each type of facility/structure
exposed. These replacement costs for the critical facilities were identified by each MA. The loss or
exposure value is then determined with the assumption that the given facility/structure is destroyed(worst
case scenario), which is not always the case in hazard events. This assumption was valuable in the
planning process, so that the total potential damage value was identified when determining capabilities
and mitigation measures for each MA.
Table 3-12, Unit Replacement Costs of Facilities, provides average replacement costs used for critical
facilities and infrastructure listed in all subsequent exposure/loss tables.
Final I August 2019 3-73
SECTION THREE Risk Assessment
Table 3-13 provides the total inventory for the critical facilities and infrastructure by jurisdiction.
Estimated exposure for critical infrastructure by MA is provided in the Jurisdiction Annexes. Table 3-14,
Planning Area Critical Facilities and Infrastructure Exposure Costs by Hazard, provides a summary of
exposure for the planning area by hazard. The costs identified reflect cost of replacement in a worst-case
scenario (defined as the highest cost submitted from among all the MAs in the study process, excluding
the regional facilities, as this would overstate the local costs). For example, Garden Grove may have
identified a cost of$3 million to replace a well and Buena Park may identify a cost of$3.5 million to
replace a well; however, $3.5 million would be used as the replacement cost for all wells within the
planning area. This methodology was used for consistency across the planning area and selection of the
highest cost helps assure that appropriate costs are considered when requesting grants. For any detailed
proposals submitted to FEMA, actual costs for mitigation and detailed estimates of the benefits of the
mitigation measure will be prepared and submitted. The costs included herein provide a relative measure
of the impacts of the various hazards.
Table 3-12
Unit Replacement Costs of Facilities$1,000's(')
Abbreviation Name Replacement Cost
L90 ($1,000's)
WST Water Storage Tank $20,000
RES Reservoir(with a dam) $50,000
WTP Water Treatment Plant(Diemer Filtration Plant) $350,000
WTP Water Treatment Plant by retail agency $10,000
PS Pump Station(South County Pump Station) $35,000
PS Retail Water Agency Pump Station $8,000
PRS Pressure Reducing Station(MET facility) $52,000
PRS Pressure Reducing Station for retail agency $2,000
EIT Emergency Interties $2,000
SC Service Connector $3,000
ADM Administration(large administration building) $8,000
LS Wastewater Pump Station/Lift Station by OCSD/SOCWA $4,000
LS Wastewater Pump Station/Lift Station by retail agency $5,000
WWTP Wastewater Water Treatment Plant $30,000
WELL Well $5,000
PP Power Plant(MET Yorba Linda Power Plant) $12,000
(1)Based on the highest cost for typical facility from among the MAs'facility values submitted. These results are
conservatively high replacement costs for some retail agencies.
For additional detail on exposure of facilities by MA, refer to the Jurisdictional Annexes. The
Jurisdiction Annexes include a discussion of hazards and vulnerabilities specific to each MA, a discussion
of their capabilities to address these losses, and identifies the actions to help mitigate damage to their
infrastructure against hazards identified in the risk assessment.
3.3.3 Land Use and Development Trends/Changes in Development
The MAs provide water and wastewater services to majority of the County, which has a population of
almost 3.2 million people. Depending upon the hazard and its magnitude and duration, a considerable
Final I August 2019 3-74
SECTION THREE Risk Assessment
number of people and businesses could be impacted. Of primary concern would be a hazard that results
in the loss of water supply and wastewater services to the planning area. As discussed previously, a
hazard could result in direct physical damage to water/wastewater infrastructure, as well as indirect
damage resulting from business disruption.
Although Orange County is urbanized and predominately built out, the Southern California Association
of Governments (SCAG)projects continued population, employment, and housing growth into 2040. The
County of Orange and its incorporated cities maintain General Plans, which identify the planned growth
and development for their respective jurisdictions. The planning area includes a wide variety of
residential and non-residential land uses. Water and wastewater service providers will continue to work
with the communities they serve to identify service needs, including the construction, expansion, or
modification of water and wastewater infrastructure. The construction of new facilities or infrastructure
will be completed in coordination with these communities to ensure compliance with appropriate codes
and regulations,including consideration of potential hazards.
Population growth and development in the County has increased since 2012. According to the
Department of Finance, the population for the County was 3,083,962 in 2012. As of January 1, 2018,the
population is 3,221,103, a growth of 4.4 percent since 2012. Along with population growth has come an
increase in development, increasing demands on water and wastewater infrastructure. Many Orange
County cities have seen shifts in development toward higher-density residential and mixed-use
development projects in response to the demand for housing.
Due to the highly developed nature of the County along with the presence of natural hazards throughout
the area such as earthquakes, liquefaction, flood risk, and wildfires, development and population growth
has continued to occur within areas of risk. Recent drought conditions have placed greater emphasis on
the ability for new development to be served by water supplies and planning for prolonged drought
conditions. Water and wastewater agencies continue to coordinate with the County, cities, and each other
to meet the demands of the respective communities they serve while also strengthening regional and local
infrastructure and overall reliability in the event of a hazard. Agencies and the District have modified
their infrastructure to include EOC's and water infrastructure,to mitigate potential threats.
3.3.4 Vulnerable Populations
Water supplies for safe drinking, sanitation, and hygiene are relied upon by the entire population.
However, there are populations within the MA service areas that would be considered more vulnerable in
the event of a hazard that affects water and wastewater infrastructure. These populations include those
that are reliant on others for their wellbeing, such as young children, individuals with disabilities,
individuals' dependent on medical equipment, and individuals with impaired mobility, as well as people
with low socioeconomic levels. Vulnerable populations are more significantly impacted in the event of a
hazard.
Final I August 2019 3-/5
SECTION THREE Risk Assessment
3.4 SUMMARY OF VULNERABILITY
Due to the nature of water and wastewater infrastructure and its location throughout Orange County, there
is some form of infrastructure that intersects with a hazard area. Table 3-14 identifies the infrastructure
that intersects with hazards that have a specific geographic area (e.g., fire hazard, liquefaction, etc.);
however,the entire MA service area also intersects with hazards that are not geographically specific (e.g.,
drought, power outage). The variety of hazards and the varying magnitude and probability of occurrence
make it challenging to assess the hazards that pose the greatest risk to the MAs. The potential losses vary
greatly depending upon the hazard and resulting impact to infrastructure. The challenge is further
magnified by the potential health and economic impacts that could occur in the event water supplies are
disrupted.
Final I August 2019 3-76
SECTION FOUR Risk Assessment
Table 3-13
Summary Assets
Facilityllnfrastructure
Existing Future
co (V CID
Q O o o c "Q O =
a U U a3 0- Cn c a -
Member Agency M U) _ CU 0 U)
t� cn c rn o a>
L c co
co
o V�n � i n
E 4) i s Ern mc u>
c
c"n
O (D°' � ( ca (i' uoi
M 1.Cn lY N
° m
I- a Cl) 85 a� m m in c 3 3 m J tY m H in c N to
o m is o as :3o �a ca co c6 (1) a) o E is "ca is m
o a _ a a w = a U) o a � a a J
Metropolitan Water District of Orange County 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Orange County Water District 901 27 0 15 3 9 0 2 0 0 4 12 40 2 0 0 6 0 0 0 0 0 1 1 1 1
Orange County Sanitation District 0 0 0 0 0 0 0 0 0 0 0 1 753 2 0 19 0 0 0 0 1 0 0 0 0 0
South Orange County Wastewater Authority 0 0 0 0 0 0 0 0 0 0 0 2 25 3 0 1 0 0 0 0 0 0 0 0 0 1
Buena Park 8 0 0 225 1 1 13 4 0 2,362 19,481 2 165 0 18,900 0 1 0 0 0 0 0 1 0 0 0
El Toro Water District 0 2 0 168 5 8 19 4 12 1,900 9,871 2 114 1 8,950 11 0 0 0 0 0 0 0 0 0 0
Garden Grove 13 0 0 440 8 5 2 4 7 3,959 33,725 2 330 0 33,725 3 1 0 0 0 0 0 0 1 0 0
La Habra 3 0 1 143 4 5 49 18 5 1,807 13,703 1 125 0 13,703 0 0 0 0 0 0 0 2 0 0 0
Laguna Beach County Water District 0 0 0 135 21 11 19 3 14 893 8,488 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
Mesa Water District 7 0 1 317 3 2 3 3 15 3,404 24,435 1 0 0 0 0 2 0 10 0 0 0 0 0 0 0
Moulton Niguel Water District 0 0 0 655 28 23 16 9 16 7,154 55,048 2 501 0 52,259 17 0 0 2 0 1 0 0 1 10 0
Newport Beach 4 1 0 297 2 5 42 6 13 2,634 26,800 1 323 0 5,525 21 0 0 0 0 0 0 0 0 0 0
Orange 15 0 0 450 16 16 14 8 16 4,411 34,000 3 0 0 0 0 2 0 0 0 0 1 1 0 1 1
Santa Margarita Water District 0 3 0 626 34 21 25 22 4 4,250 54,254 1 630 3 57,537 19 0 2 3 0 0 22 21 25 20 0
Serrano Water District 3 1 1 43 2 5 0 2 0 370 2,350 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0
South Coast Water District 1 1 1 185 13 9 25 4 19 1,522 12,551 7 151 1 16,500 14 0 0 0 0 0 0 0 0 0 0
Trabuco Canyon Water District 3 2 2 65 8 12 8 5 5 600 4,000 2 47 1 3,600 8 1 0 2 0 0 4 4 3 2 0
Westminster 10 0 0 230 2 1 0 3 4 2,672 20,515 1 0 0 0 0 1 0 2 0 0 0 0 0 0 0
Yorba Linda Water District 11 0 0 352 14 12 42 4 10 3,981 24,998 2 313 0 23,421 2 1 0 10 0 0 2 0 0 10 0
Joint Water Systems' 0 2 0 94 0 0 0 1 0 0 0 0 10 0 0 0 0 0 0 2 0 0 0 0 0 0
Metropolitan 0 1 1 122 0 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
(t) Regional water systems identified here are co-owned and managed by multiple utilities.
Final I August 2019 3-77
SECTION THREE Risk Assessment
Table 3-14
Planning Area Critical Facilities and Infrastructure Exposure Costs by Hazard
Infrastructure Type
Replacement
Hazard Costs
Water
Treatment Lift Administration
Pump Pressure Reservoirs Storage Wells Effluent Potable Wastewater ($million)'
Interties(#) Stations Control Pipeline Pipeline Pipeline
Buildings (#) Plants(#) Stations(#) Stations(#) (#) Tanks
s (#) (miles) (miles) (miles)
Moderate 0 14 13 0 7 0 13 0 0 0.5 45.02 37.78 1,483.40
Fire Hazard Zone High 0 5 6 1 0 0 13 0 1 1.0 59.03 65.8 1,729.64
Very High 0 24 47 2 10 1 71 0 5 1.6 151.14 100.65 6,098.12
FEMA Flood 100-Year 0 4 1 2 7 0 15 0 7 0.5 38.73 82.84 1,832.56
Zone 500-Year 0 18 7 1 11 0 8 0 35 2.1 106.05 171.96 2,972.88
Alquist-Priolo Fault Zone 0 0 0 0 0 2 0 0 0 1 0 4.29 0.71 44.0
Moderate 0 22 31 0 2 1 50 0 0 0 86.18 52.99 3,917.36
Ground Shaking High 1 97 60 9 19 1 55 1 57 5.2 370.53 513.72 11,039.60
Extreme 1 24 25 1 10 1 42 0 26 0 169.53 213.85 5,615.04
Moderate 0 13 11 3 3 1 14 0 33 0 85.53 188.64 3,219.36
High 2 25 6 3 1 0 17 1 40 0 91.48 198.47 3,538.60
Liquefaction Very High 0 0 0 1 0 2 0 0 0 0 10.39 16.74 231.04
Unknown 0 13 7 1 1 0 1 0 7 0 54.45 100.4 1,420.80
Landslide Zone 0 5 18 0 7 0 28 0 0 2.8 40.83 42.34 2,276.76
Tsunami Zone 0 0 0 1 7 0 0 0 0 0.6 6.75 7.42 163.16
(t)Based on the highest cost for typical facility from among the MAs'facility values submitted. These results are conservatively high replacement costs for some retail agencies.
Final August2019 3-78
SECTION FOUR Mitigation Strategy
SECTION 4 MITIGATION STRATEGY
Planning is the cornerstone to successful hazard mitigation efforts. Citizens, local government, and
private interests with proactive policies can reduce damages and impacts associated with natural and
human-caused hazards. Benefits realized by implementing hazard mitigation measures include:
• Saving lives by removing people from hazard prone situations.
• Limiting property damage by regulating development in hazard areas.
• Reducing economic impacts by minimizing outages of essential services during and after these
events.
• Saving money for taxpayers by reducing the need for services during a disaster.
• Speeding disaster recovery and post-disaster relief funds.
• Demonstrating a strong commitment to the health and safety of the community.
Relocating people, institutions, and businesses from hazard prone areas saves property and lives.
Removal or protection of the structures means that there is less to pay for disaster recovery or for services
during an event. Having alternative service plans for essential services, such as water, protects structures
from fire and allows residents and businesses to continue functioning or to restore normal functions
quicker following a disaster. Post-event, recovery crews will have less to do because there will be less
damage. Implementation of these measures speeds the overall recovery process.
4.1 HAZARD MITIGATION OVERVIEW
The mitigation strategy and actions were developed by the Planning Team based upon in-depth review of
the vulnerabilities and capabilities described in the Plan. The mitigation actions described in the
Jurisdictional Annexes represent each MA's risk-based approach for reducing and/or eliminating the
potential losses as identified in Section 3.0,Risk Assessment.
As part of the Plan update process, the hazard mitigation goals were reviewed and refined. It was
determined that the overarching mitigation goals were the same for all MAs. Therefore, one set of goals
were identified for the Plan, as discussed below. If additional,jurisdiction-specific goals were identified
by a MA,they are included in the Jurisdictional Annex.
MAs provided a comprehensive review of their mitigation actions to assess their ability to reduce risk and
vulnerability to the jurisdiction from identified hazards. Upon review of each mitigation action, an
assessment was made as to whether the mitigation action should be carried forward into the Plan update
and/or be revised/modified or removed to reflect changing conditions or priorities. Mitigation actions that
were deemed complete during the current plan period were identified and removed (refer to the
Jurisdictional Annexes). New mitigation measures were also identified.
4.1.1 FEMA's National Flood Insurance Program
In 1968, the U.S. Congress created the National Flood Insurance Program (NFIP) to provide affordable
insurance to property owners while also encouraging communities to adopt and enforce floodplain
management regulations. Community participation is voluntary; however, it is required to receive certain
grants and funding from FEMA. The Orange County Flood Division (OC Flood) is a participant in the
program and administers the floodplains within the unincorporated areas of the County. Within the
incorporated areas, Orange County cities administer their floodplains. Since the creation of NFIP, OC
Flood has worked cooperatively with cities in Orange County to reduce the floodplain area by
Final I August 2019 4-1
SECTION FOUR Mitigation Strategy
constructing flood control facilities that provide 100-year flood protection. Such facilities typically
traverse through the cities and ultimately outlet into the Pacific Ocean. All cities within Orange County
are participants in the program.
REPETITIVE LOSS PROPERTIES
According to the National Flood Insurance Program (NFIP), a repetitive loss structure is an insured
building that has had two or more losses of at least$1,000 each being paid under the NFIP within any 10-
year period since 1978. Each MA has had zero such losses within the water utility, the water department,
or wastewater department.
4.2 HAZARD MITIGATION GOALS
Mitigation goals are defined as general guidelines explaining what each jurisdiction wants to achieve in
terms of hazard and loss prevention. Goal statements are typically long-range,policy-oriented statements
representing jurisdiction-wide visions. The goals and objectives identified in the previous plan were
reviewed by the Planning Team. Through the Plan update process, it was determined that many of the
goals identified for each MA were the similar. As a result, the following hazard mitigation goals have
been identified for the Plan:
Goal 1: Minimize vulnerabilities of critical facilities and infrastructure to minimize damages and
loss of life and injury to human life caused by hazards.
Goal 2: Minimize security risks to water and wastewater infrastructure.
Goal 3: Minimize interruption to water and wastewater utilities.
Goal 4: Improve public outreach, awareness, education, and preparedness for hazards in order to
increase the community resilience.
Goal 5: Eliminate or minimize wastewater spills and overflows(Wastewater agencies).
Goal 6: Protect water quality and supply, critical aquatic resources and habitat to ensure a safe
water supply.
Goal 7: Strengthen Emergency Response Services to insure preparedness, response, and recovery
during any major or multi-hazard event.
The Plan goals guide the direction of future activities aimed at reducing risk and preventing loss from
natural and human-caused hazards. The goals also serve as checkpoints as the MAs begin implementing
mitigation action items. Mitigation goals do not account for implementation cost, schedule, funding
sources, etc. Goals represent what each MA wants to achieve, whereas the mitigation actions provide the
actions to needed to achieve the goals.
4.3 IDENTIFY AND PRIORITIZE MITIGATION ACTIONS
Mitigation actions were identified, evaluated, and prioritized by the MAs. They provide a list of activities
that the MAs will use to reduce their risk of potential hazards. Some of these actions may be eligible for
funding through federal and state grant programs and other funding sources as made available by the MAs
Final I August 2019 4-2
SECTION FOUR Mitigation Strategy
or other agencies/organizations. The mitigation actions are intended to address the comprehensive range
of identified hazards for each MA; some actions may address risk reduction from multiple hazards.
A detailed list of mitigation actions for each MA is provided in the Jurisdictional Annexes. The process
used by the Planning Team to identify hazard mitigation actions for this Plan included the following:
• Review of the Risk Assessment presented in Section 3.0;
• Review of the Capabilities Assessment presented for each MA in the Jurisdictional Annexes; and
• Team discussion of new concerns/issues that need to be addressed to reduced hazards to critical
water/wastewater infrastructure.
The mitigation actions identify the hazard, proposed mitigation action, location/facility, local planning
mechanism,risk, cost,timeframe,possible funding sources, status, and status rationale, as applicable.
MAs conducted a capabilities assessment (provided in the Jurisdictional Annexes), to identify existing
local agencies,personnel,planning tools,public policy and programs,technology, and funds that have the
capability to support hazard mitigation activities and strategies outlined in this Plan. To identify the
capabilities, the Planning Team collaborated to identify current local capabilities and mechanisms
available for reducing damage from future hazard events. The capabilities and resources were reviewed
while developing the Plan update. After completion of the capabilities assessment, each jurisdiction
evaluated and prioritized their proposed mitigations.
FEMA's STAPLEE technique was used to identify, evaluate, and prioritize mitigation actions based on
existing local conditions. Using this method each MA considered the Social, Technical, Administrative,
Political, Legal, Economic, and Environmental (STAPLEE) opportunities and constraints of
implementing a mitigation action; refer to Table 4-1, STAPLEE Review and Selection Criteria. This
process was used to help ensure that the most equitable and feasible actions would be undertaken based
on each MA's unique capabilities.
hi some instances, MAs revised the priorities of mitigation actions or removed mitigation actions all
together. If the mitigation action was completed and no further action would be needed, the action was
removed. However, in some instances it was determined that a mitigation action was no longer relevant
due to technical changes or advances, a change in service conditions, or the cost associated with a
mitigation that would not result in the benefits needed. Some actions that may have been considered
lower in priority during the last plan update were elevated due to conditions that either allowed for the
action to be prioritized, such as the potential for funding or completion of other mitigation actions that
preceded them. Mitigation actions were also prioritized based on more recent experiences associated with
drought conditions and wildfires. These hazards and the impact they have had throughout Orange County
and the State have resulted in new requirements in how these hazards are addressed in water supply and
water and wastewater infrastructure systems.
4.3.1 Hazard Mitigation Benefit-Cost Review
FEMA requires local governments/agencies to analyze the benefits and costs of a range of mitigation
actions that can reduce the effects of each hazard within their communities. Benefit-cost analysis is used
in hazard mitigation to show if the benefits to life and property protected through mitigation efforts
exceed the cost of the mitigation activity. Conducting benefit-cost analysis for a mitigation activity can
assist communities in determining whether a project is worth undertaking now to avoid disaster-related
damages later. The analysis is based on calculating the frequency and severity of a hazard, avoided future
damages, and risk.
Final I August 2019 4-3
SECTION FOUR Mitigation Strategy
A hazard mitigation plan must demonstrate that a process was employed which emphasized a review of
benefits and costs when prioritizing the mitigation actions. The benefit-cost review must be
comprehensive to the extent that it can evaluate the monetary as well as the nonmonetary benefits and
costs associated with each action. The benefit-cost review should at least consider the following
questions:
• How many people will benefit from the action?
• How large an area is impacted?
• How critical are the facilities that benefit from the action (e.g., which is more beneficial to
protect,the fire station or the administrative building)?
• Environmentally, does it make sense to do this project for the overall community?
Final I August 2019 ^—
SECTION FOUR Mitigation Strategy
Table 4-1
STAPLEE Review and Selection Criteria
STAPLEIE Review Selection Criteria
• Is the proposed action socially acceptable to the jurisdiction and surrounding
community?
Social • Any equity issues involved that would mean that one segment of the jurisdiction
and/or community is treated unfairly?
• Will the action cause social disruption?
• Will the proposed action work?
Technical • Will it create more problems than it solves?
• Does it solve a problem or only a symptom?
• Is it the most useful action in light of other jurisdictiongoals?
• Can the jurisdiction implement the action?
Administrative Is there someone to coordinate and lead the effort?
• Is there sufficient funding,staff,and technical support available?
• Are there ongoing administrative requirements that need to be met?
Political • Is the action politically acceptable?
• Is there public support both to implement and to maintain the project?
• Is the jurisdiction authorized to implement the proposed action?
• Are there legal side effects? Could the activity be construed as a taking?
Legal . Will the jurisdiction be liable for action or lack of action?
• Will the activity be challenged?
• What are the costs and benefits of this action?
• Do the benefits exceed the costs?
• Are initial, maintenance,and administrative costs taken into account?
• Has funding been secured for the proposed action? If not,what are the potential
Economic funding sources(public,nonprofit,and private)?
• How will this action affect the fiscal capability of the jurisdiction?
• What burden will this action place on the tax base or local economy?
• What are the budget and revenue effects of this activity?
• Does the action contribute to other jurisdiction goals?
• What benefits will the actionprovide?
• How will the action affect the environment?
Environmental • Will the action need environmental regulatory approvals?
• Will it meet local and state regulatory requirements?
• Are endangered or threatened species likely to be affected?
Final I August 2019 4-5
SECTION FOUR Mitigation Strategy
These questions were used to help determine the appropriateness of mitigation actions. Benefits and costs
are a primary motivation for implementing mitigation projects at water and wastewater utilities. Past
disasters have shown the benefit-cost of mitigating water utilities against identifiable hazards. For
example, a cold weather system that impacted most of the United States resulted in pipeline breaks across
the State of California. Those ruptures primarily occurred on a specific type of pipeline that has been
gradually phased out of use in California. The replacement of this type of pipeline prior to the cold front
could have not only prevented the cost of pipeline breaks, but also costs related to flooding, landslides,
loss of water supply, other secondary effects of the broken pipelines.
A study conducted in 2003 by the Orange County Business Council found that a 10-day 80%reduction in
water to South Orange County would result in a fiscal impact of$293 million dollars to both businesses
and residents alike. Longer outages during many disaster situations are probable and would be
proportionally more devastating. Each affected agency would share in the economic impacts based on its
mix of business and residential customers.
The final prioritization completed by each MA depended on the direct loss estimations for
water/wastewater critical infrastructure along with the secondary costs associated with business loss and
recovery. Much of this effort was completed with informal cost-benefit analysis based on the knowledge
and expertise of the participants (many of them certified operators, water quality experts, or engineers),
previous planning documents, and the concepts identified above. Those actions that did not have
adequate benefits were excluded from the list of mitigation actions.
4.4 REGIONAL CONSIDERATIONS
It is envisioned that the mitigation actions for the most part will be implemented on a jurisdiction-by-
jurisdiction basis. MWDOC will provide facilitation, as appropriate, of this process to help reduce
duplication of efforts between jurisdictions and to spearhead coordination of initiatives and action items
that could be accomplished more efficiently on a regional level. In its role as a regional planning agency,
MWDOC will act as lead on water related hazard mitigation projects that are regional in nature, such as
projects that cross several jurisdictional boundaries and work planned on behalf of Metropolitan. OCSD
and SOCWA will take the lead on wastewater related hazard mitigation projects that are regional in
nature and within their individual service areas.
The Risk Assessment (Section 3.0) and Jurisdictional Annexes indicate that each MA is susceptible to a
variety of potentially serious hazards in the region. The approach to emergency planning in California
has been comprehensive in its planning for and preparedness to respond to all hazards utilizing the
Standardized Emergency Management System(SEMS) and a coordinated Incident Command System. A
program managed by MWDOC, the Water Emergency Response Organization of Orange County
(WEROC), acts as coordination point (Area Command) to support an effective emergency response to
major disasters by the Orange County water and wastewater utilities. WEROC provides services that
promote planning and preparedness activities for both the utilities, as well as its own Emergency
Operations Center (EOC) staff. WEROC also helps maintain two turn-key EOCs. WEROC receives
guidance from a steering committee, which includes representatives from Orange County water utilities,
Metropolitan, the County of Orange and the California Department of Health Service's Office of
Drinking Water. WEROC and its steering committee help ensure water and wastewater utilities remain
current with state and national emergency response procedures and plans for potential disasters.
The Disaster Mitigation Act of 2000 requires that in addition to having emergency response and
emergency preparedness documents,regions should develop and maintain a document outlining measures
Final I August 2019 4-6
SECTION FOUR Mitigation Strategy
that can be implemented before a hazard event occurs that would help minimize the damage to life and
property. MWDOC has accepted the role of coordinating the development the Hazard Mitigation Plan as
a multi jurisdictional plan.
All hazard mitigation planning efforts within the region are the responsibility of the jurisdictions. As
noted, the capabilities of the jurisdictions to perform hazard mitigation planning are detailed in the
Jurisdictional Annexes.
4.4.1 Regional Fiscal Resources
One of MWDOC's primary roles in coordinating the development of the Plan is to identify and obtain
grant funding for preparing and implementing certain aspects of the Plan. This is consistent with
WEROC's role, as a program managed by MWDOC, for hazard mitigation and preparedness. WEROC
has received grants to improve the Emergency Operations Centers and to secure water trailers for
distribution of drinking water during disasters and will continue to provide guidance to the MAs with
hazard mitigation project grant applications and their implementation. Additional fiscal capabilities of the
jurisdictions to implement a hazard mitigation project are detailed in their individual capabilities
assessments.
Final I August 2019 ^—
SECTION FOUR Mitigation Strategy
This page intentionally left blank.
Final I August 2019 4-8
SECTION FIVE plan Maintenance
SECTION 5 PLAN MAINTENANCE
This section of the Plan describes the formal process that will ensure that the Plan remains an active and
relevant document. The Plan maintenance process includes a schedule for monitoring and evaluating the
Plan annually and producing a plan revision every five years. This section describes how the Member
Agencies (MAs) will integrate public participation throughout the plan maintenance process. It also
describes how the MAs intend to implement the Plan and incorporate the mitigation actions identified in
the Plan into existing planning mechanisms and programs. The Plan's format, organized with
Jurisdictional Annexes, allows the MA's to readily update sections when new data becomes available,
ensuring the Plan remains current and relevant.
5.1 MONITORING, EVALUATING AND UPDATING THE PLAN
5.1.1 Plan Maintenance
MWDOC will be responsible for initiating Plan reviews and coordinating with the MAs. The internal
planning teams for each jurisdiction will meet quarterly to review progress on Plan implementation.
MWDOC and the MA's will meet annually, or following a hazard event as described below, to monitor
the Plan's progress and implementation. This will also allow the opportunity for updates to hazards,
jurisdictional goals and mitigation action items, as necessary. If needed, the MAs will coordinate with
MWDOC to integrate updates into the Plan.
5.1.2 Plan Evaluation
The Plan will be evaluated by the MAs at least annually to determine the effectiveness of the Plan, and to
reflect changes in land development or programs that may affect mitigation priorities. MWDOC and the
Planning Team leads (or their jurisdictional representative) will also review the goals and action items to
determine their relevance to changing situations in the County, as well as changes in State or Federal
regulations and policy. MWDOC and MA representatives will also review the risk assessment portion of
the Plan to determine if this information should be updated or modified, given any new available data.
The MAs will report on the status of their projects, the success of various implementation processes,
difficulties encountered, success of coordination efforts, and which strategies should be revised. Any
updates or changes necessary will be forwarded to MWDOC for inclusion in further updates to the Plan.
MWDOC, with input from the Planning Team, will create a template to guide the Planning Team in
preparing a progress report. This will help to ensure consistent and accurate tracking of the Plan
implementation by each of the MAs. Each MA will coordinate with their responsible
departments/agencies identified for each mitigation action. These responsible departments/agencies will
help to monitor and evaluate the progress made on the implementation of mitigation actions and report to
the MA's Planning Team representative on a semi-annual basis. These responsible departments/agencies
will be asked to assess the effectiveness of the mitigation actions and modify the mitigations actions as
appropriate. The HMP Mitigation Action Progress Report worksheet will assist Planning Team
representatives in reporting the status and assessing the effectiveness of the mitigation actions. The
following questions will be considered in evaluating the Plan's effectiveness:
• Has the nature or magnitude of hazards affecting the planning area/jurisdiction changed?
• Are there new hazards that have the potential to impact the planning area/jurisdiction?
• Do the identified goals and actions address current and expected conditions?
Final I August 2019 5-1
SECTION FIVE plan Maintenance
• Have mitigation actions been implemented or completed?
• Has the implementation of identified mitigation actions resulted in expected outcomes?
• Are current resources adequate to implement the HMP?
• Should additional local resources be committed to address identified hazards?
Future updates to the HMP will account for any new hazard vulnerabilities, unusual circumstances, or
additional information that becomes available. Issues that arise during monitoring and evaluating the
HMP, which require changes to the risk assessment, mitigation strategy and other components of the
Plan,will be incorporated into the next update of the HMP, described below.
5.1.3 Plan Updates
Title 44 Section 201.6(d)(3) of the Code of Federal Regulations requires that local hazard mitigation plans
be reviewed,revised if appropriate, and resubmitted for approval in order to remain eligible for mitigation
project grant funding. Monitoring the progress of the mitigation actions, as described above, will be on-
going throughout the five-year period between the adoption of the HMP and the next update effort. The
five-year cycle may be accelerated to less than five years based on the following triggers:
• A presidential disaster declaration that impacts one or more of the MAs;
• A hazard event that causes loss of life.
Should a significant hazard occur within the planning area, the HMP Planning Team will reconvene
within 60 days of the disaster to review and update the HMP, as required.
MWDOC,working in conjunction with the MAs,will serve as the primary responsible agency for updates
to the Plan. All MAs will be responsible to provide MWDOC with jurisdictional-level updates to the
Plan when/if necessary, as described above. Every five years the updated plan will be submitted to Cal
OES and FEMA for review.
The intent of the update process will be to add new planning process methods, MA profile data, hazard
data and events, vulnerability analyses, mitigation actions, and goals to the adopted Plan so that the HMP
will always be current and up to date. Based on the needs identified by the Planning Team, the update
will, at a minimum, include the elements below:
• The update process will be convened MWDOC and a Planning Team comprised of at least one
representative from each MA.
• The hazard risk assessment will be reviewed and updated using best available information and
technologies on an annual basis.
• The evaluation of critical infrastructure and mapping will be updated and improved as funding
becomes available.
• The mitigation actions will be reviewed and revised to account for any actions completed,
deferred, or changed to account for changes in the risk assessment or new policies identified
under other planning mechanisms, as appropriate.
• The draft update will be made available to appropriate agencies for comment.
Final I August 2019 5-2
SECTION FIVE plan Maintenance
• The public will be given an opportunity to comment prior to adoption.
• The governing bodies for each MA will adopted the updated HMP.
5.1.4 Adoption
Each jurisdiction is responsible for adopting the HMP. This formal adoption should take place every five
years. Once the Plan had been adopted, MWDOC will be responsible for final submission to Cal OES.
Cal OES will then submit the Plan to FEMA for final review and approval.
5.1.5 Implementation Through Existing Programs
The effectiveness of the nonregulatory HMP depends on the implementation of the Plan and incorporation
of the outlined mitigation action items into existing plans, policies, and programs. The Plan includes a
range of action items that, if implemented, would reduce loss from hazard events in the planning area.
Together, the mitigation action items in the HMP provide the framework for activities that the MAs may
choose to implement over the next five years. The MAs have identified the Plan's goals and prioritized
jurisdiction-specific actions that will be implemented (resources permitting) through existing plans,
policies, and programs.
Implementation of the Plan will be the responsibility of each MA. Successful implementation is more
likely if the Plan recommendations are integrated into other plans and mechanisms, such as water and
wastewater master plans, urban water management plans, general plans, municipal codes, strategic plans
and capital improvement plans and budgets for each of the participating jurisdictions. Upon adoption of
the Plan, the MAs can use the Plan as a baseline of information on the hazards that impact their
jurisdictions. The Plan can also build upon related planning efforts and mitigation programs that are
already occurring within the planning area. This will also facilitate applying for funding opportunities as
they become available. Progress on implementing mitigation actions through other planning programs
and mechanisms should be monitored and integrated into future updates.
By adopting a resolution approving this HMP, each MA agrees to reference and incorporate the document
into their future local planning documents, codes, decisions,processes and regulations. The HMP will be
reviewed and considered by each MA, as applicable plans are created or updated in the future. Upon
creating or updating new plans or policies, each MA will review this HMP and consider the following:
• What hazard and/or vulnerability information should be considered and/or integrated into this
plan?
• Are there opportunities for this plan to support and/or implement mitigation actions?
• What mitigation actions can and should be integrated into this plan?
• Are there other community mechanisms that mitigation can be integrated?
• Is there information from this plan or policy that can be integrated into the next HMP update?
Further, the Water Emergency Response Organization of Orange County's (WEROC) Programs Manager
will establish as an annual agenda item to review and discuss incorporation of the HMP into local
planning efforts and processes.
Final I August 2019 5-3
SECTION FIVE plan Maintenance
Some of the ways each MA will integrate information from this HMP into their planning mechanisms are
described below.
Planning and zoning law requires all California cities to adopt a comprehensive, long-term general plan
for the physical development of the city. The plans are required to address natural hazards that could
impact a community. Further, recent legislation requires jurisdictions to conduct a vulnerability
assessment that identifies the risks that climate change poses to the local jurisdictions. Through adoption
of their General Plans and Zoning Ordinances, cities plan for the impact of natural hazards. Water and
wastewater agencies also utilize City General Plans to understand natural hazards impacting the areas
they serve and to identify future development and growth and the associated demands for water and
wastewater services. This information informs various water and wastewater plans, such as, Capital
Improvement Programs and Urban Water Management Plans. Each jurisdiction will use these plans and
this HMP as complementary documents that work together to reduce the risk of natural hazards on their
community.
The timing of updates to planning documents vary depending upon the document and statutory
requirements. The information provided in the hazards profiles, vulnerability assessment, and the
mitigation actions will be integrated directly or incorporated by reference to support and enhance
goals/policies and specific actions for each MA. This will be done as the documents are updated by each
jurisdiction. More specifically, upon their next General Plan updates, cities will incorporate updated
hazard and vulnerability information from the HMP, including integration of mitigation actions into their
goals and policies. This is typically done in part through preparation of an Existing Conditions Report or
an update of existing conditions within the various General Plan elements. Through the process of
updating a General Plan, goals,policies and implementation actions are reviewed and new goals,policies,
and actions are created to address issues or concerns within the community, including natural hazards.
Hazard information will identify the exposure of populations, land uses, and critical infrastructure from
hazards. A General Plan update includes a community outreach process that allows direct input from the
community on these issues and provides an opportunity to educate the public on hazards and
opportunities to reduce their impact. A General Plan update also requires recommendation for adoption
and/or adoption by the cities' respective Planning Commissions and City Councils, further ensuring its
implementation as future projects are required to be assessed for their consistency with a General Plan
prior to approval.
Similarly, updated water and wastewater plans will integrate more current hazard and vulnerability
information and establish or update their framework for implementing actions identified in the HMP.
Upon creating or updating any plans, water and wastewater agencies will review this HMP to ensure
integration of the mitigation actions into the respective plans. This will be done as staff assesses the
current plan and incorporates updated hazard information and the mitigation actions from this HMP.
The Urban Water Management and Planning Act was passed in 2010 and requires water suppliers to
estimate water demands and available water supplies. Each water district has an Urban Water
Management Plan (UWMP). UWMPs are required to evaluate the adequacy of water supplies including
projections of 5, 10, and 20 years. These plans are also required to include water shortage contingency
planning for dealing with water shortages, including a catastrophic supply interruption.
Final I August 2019 5-
SECTION FIVE plan Maintenance
UWMPs are intended to be integrated with other urban planning requirements and management plans.
Some of these plans include city and county General Plans, Water Master Plans, Recycled Water Master
Plans, Integrated Resource Plans, Integrated Regional Water Management Plans, Groundwater
Management Plans, Emergency Response Plans, and others. Each water district will review the HMP in
coordination with preparation of UWMP updates to ensure the most current hazard information is
provided and that the appropriate mitigation actions are incorporated.
Additionally, all water utilities are required to conduct Risk and Resilience Assessments (RRA) and
corresponding Emergency Response Plans (ERP) in the coming year per the America's Water
Infrastructure Act of 2018 (AWIA). The Risk and Resilience Assessments are similar to the hazard
mitigation risk assessment process in that various risks are assessed, but typically in a more in depth
manner by not just evaluating the risk, but also all potential physical and cyber components of operations
and business continuity. AWIA requires water utilities to assess their facilities for all-hazard risks, but
specifically calls attention to physical security, natural hazard risks, cyber security, fiscal processes
security, and climate change. The corresponding Emergency Response Plan (ERP) is more similar to an
overall FEMA based hazard mitigation plan, than a traditional emergency response plan for say a
jurisdiction with an EOC. The ERP typically addresses possible mitigations or solutions very specific to
identified risks. Both the RRA and the ERP are documents that are considered Protected Critical
Infrastructure Information (PCII) due to information within the documents related to the water
infrastructure. However, MA will integrate pertinent information from this mitigation plan into their
updated RRA and ERPs,as well as utilize those documents to continue to update and enhance the HMP.
Wastewater agencies are also required to maintain current Sewer Master Plans, Sanitary Overflow
Response Plans, and Fats, Oils, and Grease Ordinances. These plans can help to support hazard mitigation
efforts, as well as shape future policy to reduce the impacts of sewer system failures.
Each MA has its own budget process, including CIPs that identify capital projects and equipment
purchases. These systems provide a link between a MAs general and/or strategic plan and annual budget.
As part of the annual review and update of the CIP, the mitigation actions identified in this HMP will be
reviewed to determine which actions should be included within the CIP.
This HMP will be added or incorporated by reference into each MA's emergency plans (e.g., Emergency
Operations Plans, Emergency Response Plans, and Emergency Evacuation Plans) as they are updated.
The hazard profiles, risk assessment, and mitigation actions will be reviewed during updates to these
plans. Further, mitigation actions not currently provided in the HMP will be identified for consideration
as part of the HMP update.
Other opportunities for integration of this HMP include education programs and continued coordination
between the MAs and other agencies. Each MA maintains a website and utilizes social media to provide
updated information to its community and service area. Hazard information and opportunities for the
community to reduce individual exposure to hazards will be provided. Some MAs will also provide in-
person educational events and activities to further inform the community.
Final I August 2019 5-5
SECTION FIVE plan Maintenance
5.1.6 Continued Public Involvement
MWDOC is dedicated to involving the public directly in review and updates of the Plan. MWDOC and a
representative from each participating jurisdiction will be responsible for monitoring, evaluating, and
updating the Plan as described above. During all phases of plan maintenance, the public will have the
opportunity to provide feedback.
The most current copy of the Plan will be publicized and permanently available for review on MWDOC's
website at www.mwdoc.com/weroc/Hazard-Mitigation. The site will contain contact information to
which people can direct their comments and concerns. All public feedback will be forwarded to the
appropriate jurisdiction for review and consideration for incorporation (if deemed appropriate) into the
next plan update. This information will also be forwarded to MWDOC, responsible for keeping track of
public comments on the Plan. In addition, copies of the Plan will be catalogued and kept at all the
appropriate agencies in the county. The existence and location of these copies will also be posted on the
MWDOC website. This will provide the public an outlet for which they can express their concerns,
opinions, or ideas about any updates/changes that are proposed to the Plan.
Final I August 2019 5-6
SECTION SIX References
SECTION 6 REFERENCES
Arcadis. (May 2016). Municipal Water District of Orange County,2015 Urban Water Management Plan.
California Department of Forestry and Fire Protection,Fire and Resource Assessment. (October 2011).
Very High Fire Hazard Severity Zones in IRA Map. http://frap.fire.ca.gov/projects/hazard/fhz.
California Governor's Office of Emergency Services.HazMat Spill Notification Database.
http://www.caloes.ca.gov/FireRescueSite/Pages/Spill-Release-Reporting.aspx. Accessed August
24,2017.
Centers for Disease Control and Prevention.Drinking Water FAQ.
https://www.cdc.gov/healthywater/drinking/public/drinking-water-faq.html#who contact.
Accessed January 10, 2018.
City of Buena Park. (December 2010). 2035 General Plan Final EIR. http://www.buenapark.com/city-
departments/community-development/planning-division/general-plan/203 5-general-plan.
City of Garden Grove. (May 2008). Garden Grove General Plan. https://www.ci.garden-
grove.ca.us/commdev/planning/general-plan
City of La Habra(January 14, 2014). General Plan 2035.
(http://lahabracity.com/DocumentCenterNiew/197
City of Newport Beach. (July 25,2006). General Plan.
http://www.newportbeachca.gov/government/departments/community-development/planning-
division/general-plan-codes-and-regulations/general-plan.
City of Orange. (March 9,2010). 2010 General Plan.http://www.cityoforange.org/391/General-Plan
City of Westminster. (September 2016). Westminster General Plan Update. http://www.westminster-
ca.gov/civicax/filebankiblobdload.aspx?BloblD=l 1158
City of Yorba Linda. (2016). 2016 Yorba Linda General Plan.
https://www.yorbalindaca.gov/DocumentCenterNiew/475
Cocca, Christina. (July 19, 2013).Power Back on After Massive Blackout Hits South Orange County, San
Diego. https://www.nbclosangeles.com/news/local/Massive-Blackout-Hits-South-orange-county-
San-Diego-216115731.html.
County of Orange. (May 2014).Emergency Operations Plan.
County of Orange. (2015). General Plan, Safety Element.
https://www.ocgov.com/gov/pw/cd/planning/generalplan2005.asp
Ethan Miller Brown, OCSD Emergency Management Division, email correspondence, September 5,
2017.
Federal Emergency Management Agency. (December 3, 2009).Flood Insurance Study, Orange County,
California and Incorporated Areas.
Final I August 2019 6-1
SECTION SIX References
Federal Emergency Management Agency. (2012). Open Pacific Coast Study Frequently Asked Questions.
http://www.r9map.org/Documents/OPC%20FAQ_8.2012.pdf
Federal Emergency Management Agency. (October 4,2016).Flood Risk Report, Orange County, CA
Open Pacific Coast Flood Insurance Study. Report Number 01.
Hapke,C.J.,Reid,D.,Richmond, B.M.,Ruggiero,P.,and List,J. (2006).National assessment of
shoreline change:Part 3:Historical shoreline changes and associated coastal land loss along
the sandy shorelines of the California coast: U.S. Geological Survey Open-file Report 2006-1219.
https://pubs.usgs.gov/of/2006/1219/.
Hernandez, Salvador, Orange County Register. (August 7, 2013). Cleveland National Forest fire 78%
contained. https://www.ocregister.com/2013/08/07/cleveland-national-forest-fire-78-contained/.
LA Times. (December 20,2016).AECOM, EnergySolutions win bid to decommission San Onofre nuclear
plant.http://www.latimes.com/business/la-fi-san-onofre-decommission-20161220-story.html.
Accessed January 10, 2018.
Lee, Greg,ABC 7. (July 13,2015).Brush fire erupts on State Route 241 near Irvine Lake; campgrounds
evacuated. http://abc7.com/news/brush-fire-erupts-on-state-route-24l-near-irvine-lake/848365/.
Luhdorff& Scalmanini Consulting Engineers. (April 2014).Land Subsidence from Groundwater Use in
California.
https://www.water.ca.gov/LegacyFile s/waterplan/docs/cwpu20 l 3/Final/vol4/groundwater/13 Lan
d Subsidence_Groundwater Use.pdf
NASA(March 19,2018). Global Climate Change Vital Signs of the Planet.https://climate.nasa.gov/.
Accessed March 2018.
National Climate Assessment. (2014). Coastal Zone Development and Ecosystems.
http://nca20l4.globalchange.gov/report/regions/coasts.
National Oceanic and Atmospheric Administration,Climate Prediction Center.Drought Monitoring.
http://www.cpc.ncep.noaa.gov/products/monitoring_and_data/drought.shtml. Accessed March
2018.
National Oceanic and Atmospheric Administration,National Centers for Environmental Information.
Storm Events Database, Event Types: Tsunami.
https://www.ncdc.noaa.gov/stonnevents/choosedates.jsp?stateflps=6,CALIFORNIA.Accessed
March 21, 2018.
National Oceanic and Atmospheric Administration,National Centers for Environmental Information.
Storm Events Database, Event Types: Wildfire.
https://www.ncdc.noaa.gov/stormevents/choosedates.jsp?statefips=6,CALIFORNIA.Accessed
March 21, 2018.
National Oceanic and Atmospheric Administration,National Centers for Environmental Information.
Storm Events Database, Event Types:High Winds.
https://www.ncdc.noaa.gov/stormevents/choosedates.jsp?stateflps=6,CALIFORNIA.Accessed
March 21, 2018. 1
Final I August 2019 6-2
SECTION SIX References
National Oceanic and Atmospheric Administration,National Centers for Environmental Information.
Storm Events Database. https://www.ncdc.noaa.gov/stonnevents/.
Orange County Sanitation District. (2017).Annual Report 2016-2017.
Orange County Sanitation District. (December 2017).Five Year Strategic Plan.
Orange County Sheriff's Department.JTTF.
http://www.ocsd.org/divisions/fieldops/security/terrorism/jttf.Accessed August 24, 2017.
Orange County Sheriff s Department. OC Intelligence Assessment Center.
http://www.ocsd.org/divisions/fieldops/security/iac. Accessed August 23,2017.
Orange County Water District. (2015). Groundwater Management Plan 2015 Update.
https://www.ocwd.com/media/3 622/groundwatermanagementplan2O l 5update_20150624.pdf
Orange County Water District.North Basin Groundwater Remedial Investigation and Feasibility Study.
https://www.ocwd.com/what-we-do/water-quality/groundwater-cleanup/north-basin/.Accessed
January 10,2018.
Orange County's Homeland Security. https:Hmedia.ocgov.com/gov/bos/5/info/issues/homeland.asp.
Accessed August 23, 2017.
Our Coast, Our Future.Interactive Map.http://data.pointblue.org/apps/ocof/cros/index.php?page=flood-
map.Accessed August 2017.
Robert Olson Associates. (June 1999).Metro Regional Hazard Mitigation and Planning Guide.
Rocha,Veronica, LA Times. (September 27,2016). Where is the Holy fire burning?
http://www.latimes.com/local/califomia/la-me-updates-wildfire-season-where-is-the-holy-fire-
1472674601-htmistory.html#nt=card.
Salazar,Denisse, Orange County Register. (October 7,2013). Silverado fire battle continues overnight.
https://www.ocregister.com/2013/10/07/silverado-fire-battle-continues-overnight/.
San Diego Union-Tribune. (January 10.2018). Court Settlement looks to move nuclear waste from San
Onofre. http://www.sandiegouniontribune.com/business/energy-green/sd-fi-songs-agreement-
20170828-story.html. Accessed January 10, 2018.
Southern California Association of Governments,Regional Transportation Plan 2012-2035 Sustainable
Communities Strategy, Growth Forecasts,Adopted April 2012
State of California Department of Conservation. http://www.conservation.ca.gov/.
State of California, Cal Fire.Incident Results. www.cdfdata.fire.ca.gov. Accessed August 16,2017.
Sudock,Joshua,Orange County Register. (June 27, 2016).Laguna Wilderness Parkfire nearing
containment; roads open.https://www.ocregister.com/2016/06/27/laguna-wilderness-park-fire-
nearing-containment-roads-open/.
Final I August 2019 6-3
SECTION SIX References
Union of Concerned Scientists. When Rising Seas Hit Home.
https://ucsusa.maps.arcgis.com/apps/MapSeries/index.html?appid=64b2cbdO3 a3 d4b87aaddaf65 f
6b33332.
United States Climate Resilience Toolkit, The Climate Explorer. https://toolkit.climate.gov/climate-
explorer2/. Accessed March 2018.
United States Department of Agriculture. (January 2016).Effects of Drought on Forests and Rangelands
in the United States:A Comprehensive Science Synthesis.
https://www.fs.fed.us/rm/pubs_journals/2016/rmrs_2016_littell_j002.pdf
United States Environmental Protection Agency. (December 8,2017).EPA Prioritizes Cleanup of
Orange County North Basin Groundwater.https://www.epa.gov/newsreleases/epa-prioritizes-
cleanup-orange-county-north-basin-groundwater. Accessed January 10,2018.
United States Geological Survey. (May 2000).Landslide Hazards (Fact Sheet 0071-40, Version 1.0).
https://pubs.usgs.gov/fs/fs-0071-00/fs-0071-00.pdf.
United States Geological Survey. Coastal Storm Modeling System: CoSMoS.
https://walrus.wr.usgs.gov/coastal_processes/cosmos/.Accessed August 2017.
University of California San Diego, Climate Research Division. (June 1, 2016). Santa Ana.
http:/meteora.ucsd.edu/cap/santa_ana.html. Accessed March 2018.
Final I August 2019 6—
9/11/2019
2019 Orange County
Regional Water &
■ 7m am Wastewater Hazard
Mitigation Plan
WIN
Presented by: Rod Collins,
Safety and Health Supervisor
=t
SEEN&
f _
1
• History
• Hazard Mitigation Planning
• Plan requirements and process
• Overview and benefits
• Orange County Regional Water and Wastewater
Multi-Jurisdictional Mitigation Plan (HMP)
• Benefits of Regional Planning
• Framework
• Hazard/risk identification
• Mitigation strategy
• Annex C — Orange County Sanitation District
1
2
9/11/2019
Participating - :
Agencies
Municipal Water District of City of La Habra Serrano Water District
Orange County
Orange County Water Laguna Beach County Water South Coast Water
District District District
Orange County Mesa Water District Trabuco Canyon
Sanitation District Water District
South Orange County Moulton Niguel Water District City of Westminster
Wastewater Authority
City of Buena Park City of Newport Beach Yorba Linda Water
District
El Toro Water District City of Orange
City of Garden Grove Santa Margarita Water /
District
3
➢The Disaster Mitigation Act of 2000 requires all cities, counties and
special districts to develop and adopt a Hazard Mitigation Plan (HMP)to
be eligible to receive federal grants pertaining to disaster mitigation.
➢ In 2005 the Water Emergency Response Organization (WEROC)sought
funding with member agencies.
➢ In 2007 the Municipal Water District of Orange County(MWDOC)
member agencies prepared the HMP.
➢ In 2012 OCSD Board of Directors approved the updated HMP.
➢This 2019 Plan builds on the original 2007 Plan and the previous 2012 /
update.
4
9/11/2019
OverviewHazard Mitigation
•Sustained actions taken to reduce or eliminate long-
term risk to life and property from hazards
What is Hazard Mitigation? •Mitigation actions do NOT stop a hazard from occurring
•Mitigation actions REDUCE the impact of a hazard
when it occurs
•Identifies the natural hazards a community faces
What is a Hazard Mitigation Plan? •Assesses the risk/vulnerability to the hazards
•Identifies specific actions that can be taken to reduce the
risk from the hazards
•A hazard mitigation plan in which multiple entities join
efforts into one planning process
•An HMP benefits participating agencies by facilitating
itigation Plan(HMP) cross jurisdictional discussions,collaboration and
planning ,
•Each participating agency in an HMP is approved as a;�
independent governing jurisdiction
5
• n Requirements _ •
• . Process
e" ;
• Review and incorporate existing plans, studies,
reports, and technical information
• Document how the plan was prepared and who
was involved
• Identify how the plan will be monitored, evaluated,
and updated regularly
• Provide for continued public participation in plan
maintenance
• Five-year cycle for FULL updates to
6
9/11/2019
Public •. •
Involvement ' -,,-Strategies
• Residents/business Identify&profile Capabilities
owners hazards o Ability to expand
• Government agencies o Description Goals
• Community o History Specific actions
organizations o Location Actions completed
• Schools o Magnitude/severity since last plan
• Non-profits o Likelihood • Integration into other
• Identify risks planning mechanisms
• Potential losses
o Critical facilities
7
Benefits ofanUpdated
and Approved HMP
• Increases awareness of hazards, risk, and
vulnerabilities
• Identifies actions for risk reduction
• Aligns risk reduction with other objectives
• Builds partnerships for risk reduction
• Focuses resources on the greatest risks
8
9/11/2019
Benefitsof an Updated
• Approved •
• Communicates priorities to potential funding
sources
• Enables action to reduce loss of life and property,
lessening impact of disasters
• FEMA-approved HMP is a condition for receiving
certain types of non-emergency disaster
funding
•
9
Benefits of Regional
7,31
Planning
• Standing OC Water and Wastewater Utility Best Practice
• Historically
• Worked together to improve regional and local reliability and
resiliency
• Utilize joint or collaborative capital improvement projects, planning
processes and emergency management practices
• This Plan
• Focused only on the agencies that provide drinking water and
wastewater services
• Greater analysis of the risk as it applies specifically to these
services
• Project planning driven by the principles of economies of scale
• Enhance limitations on risk by working together
• Enhances mutual aid planning objectives /
10
9/11/2019
HMP Framework
Z"
• Introduction and Purpose
• Planning Process Documentation
• Risk Assessment and Hazard Identification
• Mitigation Strategy
• Plan Maintenance
• Jurisdictional Annexes (Annex C is the OCSD Plan)
11
Regional Risks
t
• GIS mapping of water/wastewater infrastructure overlaid with
hazard maps
• Wildfires
• Flood
• Fault rupture
• Earthquakes
• Liquefaction/landslides
• Tsunamis
• Manmade (terrorism, accidental)
• Replacement cost and value to the community
• Worst-case scenario assuming complete cost of
replacement
• Relative measure of the impacts of the various hazards /
12
9/11/2019
Annex C:
OCSD Hazards & Risks
Risk to
Infrastructure
• Flooding • Lift Stations
• Earthquake • Treatment
• Liquefaction Plants
• Human-Caused • Wastewater
Pipeline
• Wildfire
• Tsunami
• Costal Erosion
13
Development of
Mitigation Strategy
• Reviewed risk and capabilities specific to service area
• Mitigation strategies reflect vulnerabilities of critical facilities
• Reviewed existing mitigation actions to determine:
• Relevant mitigation actions that should remain or be revised
• Mitigation actions that are no longer feasible/viable
• Mitigation actions that have been completed
• New mitigation actions
os -
14
9/11/2019
OCSD Mitigation
Actions
i
• Build redundancy into the treatment process
• Follow the asset management plan for replacement and refurbishment
of facilities
• Identify locations & install sensors/alarms for harmful contaminants
entering the treatment system
• Improve security at higher priority sites
• Upgrade supervisory control and data acquisition (SCADA)system to
existing sites as needed
• Harden and improve physical security
• Examine opportunities for online water quality sensing
• Perform a seismic study analysis for critical infrastructure
15
Next Steps -S
• Immediate Action:
• Staff recommends approval and adoption the 2019 Orange
County Regional Water and Wastewater Hazard Mitigation Plan
(Annex C)
• MWDOC will provide Annex C and signed Resolution to FEMA for
future grant applications
• Over the Next 5 Years:
• Staff will integrate the HMP concepts into local hazard mitigation
plan (LHMP)
• Work on and implement mitigation actions
• Apply for mitigation grant funds for projects
• Monitor implementation of the plan
• Continue community and partner agency involvement
• Continue to review and update the plan as applicable /
16
9/11/2019
Questions?
Ilk
17
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
ADMINISTRATION COMMITTEE (714)5937433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-611 Agenda Date: 9/25/2019 Agenda Item No: 13.
FROM: James D. Herberg, General Manager
Originator: Lorenzo Tyner, Assistant General Manager
SUBJECT:
REIMBURSEMENTS TO BOARD MEMBERS AND STAFF
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file report of reimbursements to Board Members and Staff per Government Code
Section 53065.5 for the period July 1, 2018 through June 30, 2019.
BACKGROUND
Government Code Section 53065.5 requires all Special Districts to disclose any reimbursements paid
by the district within the immediately preceding fiscal year of at least one hundred dollars ($100) or
more for each individual charge for services or product received. The individual charge includes, but
is not limited to, tuition reimbursement; certificate or license reimbursement; or meals, lodging,
transportation, or registration fee reimbursed to any employee or member of the governing body of
the district. The disclosure requirement shall be fulfilled by including the reimbursement information
in a document published or printed at least annually by a date determined by that district and shall be
made available for public inspection.
Attached is the report of these reimbursements for the fiscal year ended June 30, 2019.
RELEVANT STANDARDS
• Government Code Section 53065.5
PROBLEM
N/A
PROPOSED SOLUTION
N/A
TIMING CONCERNS
Orange County Sanitation District Page 1 of 2 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-611 Agenda Date: 9/25/2019 Agenda Item No: 13.
N/A
RAMIFICATIONS OF NOT TAKING ACTION
N/A
PRIOR COMMITTEE/BOARD ACTIONS
September 2018 - Annual report of reimbursements per Government Code Section 53065.5 for the
period July 1, 2017 through June 30, 2018.
ADDITIONAL INFORMATION
N/A
CEQA
N/A
FINANCIAL CONSIDERATIONS
N/A
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Report of reimbursements per Government Code Section 53065.5 for the period July 1, 2018
through June 30, 2019
Orange County Sanitation District Page 2 of 2 Printed on 9/19/2019
powered by LegistarTM
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
160 133276 Abushaban, Randa Regulatory Specialist 2,320.00 Certification Reimbursement
160 153808 Adams,Matt Senior Plant Operator 300.00 Certification Reimbursement
160 163475 Aguilar,Janine M. Human Resources Supervisor 750.56 Cornerstone Training San Diego, CA 6/3-6/5/19
220 267151 Alvarez,Angela N. Principal Accountant 254.00 Membership Renewal
840 8133 Amezcua, Gerardo Operations Supervisor 106.20 Employee Appreciation Lunch
160 676289 Anagnostou,Asterios K. Operator In Training 120.00 Certification Reimbursement
160 676289 Anagnostou,Asterios K. Operator In Training 155.00 Certification Reimbursement
830 676289 Anagnostou,Asterios K. Operator In Training 119.55 Tuition Reimbursement
160 256196 Baker, Charles Eddie Chief Plant Operator 150.00 Certification Reimbursement
110 630521 Barela, Gilbert G. Senior Mechanic 542.05 Tri-State Conference Las Vegas, NV 9/24-9/27/18
110 630521 Barela, Gilbert G. Senior Mechanic 760.12 CWEA Annual Conference Palm Springs, CA 4/9-4/12/19
160 630521 Barela, Gilbert G. Senior Mechanic 102.00 Certification Reimbursement
160 630521 Barela, Gilbert G. Senior Mechanic 135.00 Certification Reimbursement
870 630521 Barela, Gilbert G. Senior Mechanic 10,008.36 Tuition Reimbursement
875 9128 Basrai, Shabbir S. Senior Engineer 210.11 Food for Analysis Presentation
870 678111 Bassett, Natalia A. Engineer 712.69 Factory Equipment Testing Seneca, NC 1/27- 1/29/19
160 678111 Bassett, Natalia A. Engineer 115.00 Certification Reimbursement
822 7835 Bell, Robert M. Maintenance Supervisor 188.61 Food for Main St. Pump Station Emergency 2/13-2/14/19
110 673871 Bernstein,Allan L. Board of Directors 1,260.26 CASA Annual Conference Monterey, CA 8/8-8/10/18
110 673871 Bernstein,Allan L. Board of Directors 737.05 Lobby Days Meeting Washington, DC 6/17-6/19/19
160 674507 Beutler, Brett L. Senior Plant Operator 365.00 Certification Reimbursement
160 7528 Bingman, Brian Engineering Supervisor 115.00 Certification Reimbursement
230 360516 Blakeley, Gregory R. Buyer 320.71 CAPPO Annual Conference Sacramento, CA 1/13- 1/18/19
160 678663 Bontems, Baylee E. Human Resources Analyst 815.40 Cornerstone Training San Diego, CA 6/3-6/5/19
110 677880 Boyce, Jason R. Senior Mechanic 655.74 Tri-State Conference Las Vegas, NV 9/24-9/27/18
160 663533 Brown,Andrew P. Engineer 115.00 Certification Reimbursement
160 9110 Brown, Jeffrey Senior Engineer 116.00 Certification Reimbursement
160 9110 Brown, Jeffrey Senior Engineer 200.00 Certification Reimbursement
160 682953 Caballero, Steven Electrical Technician 1 170.00 Certification Reimbursement
110 164718 Cabral, James Maintenance Supervisor 419.17 Leadership Training Hillsboro, OR 4/1 -4/3/19
820 164718 Cabral, James Maintenance Supervisor 104.97 Site Visit Las Vegas, NV 1/22/19
820 164718 Cabral, James Maintenance Supervisor 334.88 CWEA Meeting Morro Bay, CA 7/27-7/29/18
110 164718 Cabral, James Maintenance Supervisor 318.86 Leadership Training Seattle,WA 5/6- 5/9/19
110 164718 Cabral, James Maintenance Supervisor 570.41 Leadership Training Spokane,WA 3/4- 3/6/19
110 164718 Cabral, James Maintenance Supervisor 501.27 Leadership Training Tacoma,WA 2/4-2/6/19
160 164718 Cabral, James Maintenance Supervisor 102.00 Certification Reimbursement
140 111202 Cabral, Jennifer M. Public Affairs Supervisor 635.42 CASA Winter Conference Indian Wells, CA 1/23- 1/25/19
140 111202 Cabral, Jennifer M. Public Affairs Supervisor 1,237.11 CASA Annual Conference Monterey, CA 8/7-8/10/18
230 648819 Calvo, Reed Lead Storekeeper 2,209.00 Tuition Reimbursement
220 640542 Cardenas, Kim A. Accounting Supervisor 651.36 CSMFO Conference Palm Springs, CA 1/9- 1/11/19
110 104512 Carrillo, Dindo A. Senior Environmental Specialist 587.88 CWEA Annual Conference Palm Springs, CA 4/10-4/12/19
160 662531 Casanova, Clifford E. Senior Plant Operator 255.00 Certification Reimbursement
160 662531 Casanova, Clifford E. Senior Plant Operator 365.00 Certification Reimbursement
760 79935 Cassidy,William D. Engineering Supervisor 370.18 CWEA Board of Directors Meeting La Jolla, CA 1/25- 1/26/19
110 79935 Cassidy,William D. Engineering Supervisor 1,777.98 WEFTEC Conference New Orleans, LA 9/28- 10/4/18
760 79935 Cassidy,William D. Engineering Supervisor 606.38 CWEA Board of Directors Meeting Oakland, CA 6/27-6/29/19
Prepared by: L.Henshaw
1 of 9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
110 79935 Cassidy,William D. Engineering Supervisor 660.88 CWEA Annual Conference Palm Springs, CA 4/8-4/12/19
110 79935 Cassidy,William D. Engineering Supervisor 765.00 WEFTEC Conference Registration
160 574101 Cecil,Jim D. Plant Operator 150.00 Certification Reimbursement
160 666099 Chandler, Celia M. Director of Human Resources 1,458.23 CALPERLA Conference Monterey, CA 12/4- 12/9/18
160 647251 Chang,Anthony Senior Plant Operator 150.00 Certification Reimbursement
160 647251 Chang,Anthony Senior Plant Operator 255.00 Certification Reimbursement
160 647251 Chang,Anthony Senior Plant Operator 365.00 Certification Reimbursement
161 514087 Chang, Esther H. Senior Plant Operator 173.99 Safety Boots
160 636666 Chang, Frankie Senior Plant Operator 150.00 Certification Reimbursement
160 8766 Cheffs, Peter Lead Mechanic 189.00 Certification Reimbursement
630 558901 Choi, Samuel Environmental Supervisor 1,739.96 ASM Microbe Conference San Francisco, CA 6/20-6/24/19
160 7819 Cleveland, Donald R. Lead Mechanic 189.00 Certification Reimbursement
160 584616 Coghill,Adam D. Senior Engineer 116.00 Certification Reimbursement
110 660084 Collacott, Donald R. Board of Directors 207.82 CSDA Annual Conference Indian Wells, CA 9/24-9/26/18
160 541667 Collett, David M. Senior Plant Operator 225.00 Certification Reimbursement
160 541667 Collett, David M. Senior Plant Operator 230.00 Certification Reimbursement
160 539321 Collins, Rodney L. Safety Et Health Supervisor 150.00 Certification Reimbursement
160 539321 Collins, Rodney L. Safety Et Health Supervisor 160.00 Certification Reimbursement
160 539321 Collins, Rodney L. Safety Et Health Supervisor 160.00 Certification Reimbursement
160 539321 Collins, Rodney L. Safety Et Health Supervisor 230.00 Certification Reimbursement
610 7907 Colston,James E. Director of Environmental Services 152.00 CASA Annual Conference Monterey, CA 8/7-8/10/18
110 7907 Colston,James E. Director of Environmental Services 289.00 WEFTEC Conference New Orleans, LA 9/29- 10/3/18
880 671883 Compton,Travis J. Electrical Technician II 792.33 Tuition Reimbursement
160 109891 Conklin, Gary P. Senior Engineer 115.00 Certification Reimbursement
630 485124 Coss, Ronald J. Environmental Laboratory Et Operations Manager 706.01 NACWA Winter Conference Albuquerque, NM 2/5-2/8/19
630 485124 Coss, Ronald J. Environmental Laboratory Et Operations Manager 584.68 Leadership Center Training Chapel Hill, NC 4/28- 5/10/19
630 485124 Coss, Ronald J. Environmental Laboratory Et Operations Manager 1,454.30 AWWA Conference Nashville,TN 3/4- 3/8/19
630 485124 Coss, Ronald J. Environmental Laboratory Et Operations Manager 1,123.54 NEMC Conference New Orleans, LA 8/5-8/10/18
630 485124 Coss, Ronald J. Environmental Laboratory Et Operations Manager 478.83 NACWA Seminar San Diego, CA 11/14- 11/15/18
160 485124 Coss, Ronald J. Environmental Laboratory Et Operations Manager 190.00 Certification Reimbursement
160 166123 Crafton,Ann M. Principal Staff Analyst 100.00 Certification Reimbursement
160 166123 Crafton,Ann M. Principal Staff Analyst 102.00 Certification Reimbursement
230 166123 Crafton,Ann M. Principal Staff Analyst 188.00 Certification Reimbursement
160 554548 Crider, Suzanne A. Principal Staff Analyst 405.00 Certification Reimbursement
750 554548 Crider, Suzanne A. Principal Staff Analyst 139.00 Membership Renewal
250 654573 Crow, Chad C. Senior Information Technology Analyst 799.49 ICMI Conference Las Vegas, NV 11/12- 11/14/18
160 654573 Crow, Chad C. Senior Information Technology Analyst 405.00 Certification Reimbursement
760 405868 Cuellar, Raul Engineering Supervisor 300.80 NASTT Conference Chicago, IL 3/17- 3/20/19
770 360532 Curry, Ian P. Senior Information Technology Analyst 945.60 Software Training Pullman,WA 8/6-8/10/18
770 360532 Curry, Ian P. Senior Information Technology Analyst 729.90 RTAC Training Vacaville, CA 8/20-8/23/18
160 662400 Cutler, Donald W. Engineering Supervisor 115.00 Certification Reimbursement
160 662400 Cutler, Donald W. Engineering Supervisor 220.00 Certification Reimbursement
160 150981 Dalgoff, Jacob Senior Engineer 115.00 Certification Reimbursement
160 673256 Daniel, Jason A. Engineer 115.00 Certification Reimbursement
620 673256 Daniel, Jason A. Engineer 188.00 Membership Renewal
750 288075 DaSilva,Andy Engineer 328.00 Membership Renewal
Prepared by: L.Henshaw
2of9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
760 288075 DaSilva, Andy Engineer 5,275.42 Tuition Reimbursement
220 646397 DeGuzman, Rhea M. Senior Accountant 1,007.21 CMTA Annual Conference San Diego, CA 4/16-4/19/19
140 637669 Deterding, Gregg J. Graphics Coordinator 198.28 Adobe Conference Los Angeles, CA 10/15- 10/17/18
140 637669 Deterding, Gregg J. Graphics Coordinator 134.33 Holiday Supplies
630 670258 Diaz,Absalon H. Environmental Specialist 7,663.94 Tuition Reimbursement
630 96903 Diaz,Arturo Principal Environmental Specialist 180.00 Membership Renewal
250 678401 Diaz,Joanne F. Data Management Technician 1 629.11 Autodesk University Training Las Vegas, NV 11/13- 11/15/18
110 682401 Dilliner, Dennis L. Source Control Inspector II 547.95 Tri-State Conference Las Vegas, NV 9/24-9/27/18
620 682401 Dilliner, Dennis L. Source Control Inspector II 224.11 Environmental Crimes Training San Luis Obispo, CA 4/30- 5/10/19
620 682401 Dilliner, Dennis L. Source Control Inspector II 1,340.11 P3S Conference Seaside, CA 2/10-2/13/19
160 113953 Dix,Martin A. Engineering Supervisor 115.00 Certification Reimbursement
760 113953 Dix,Martin A. Engineering Supervisor 129.00 Certification Reimbursement
160 417130 Dorman,Michael T. Engineering Manager 116.00 Certification Reimbursement
830 635743 Downer, Sid M. Senior Plant Operator 217.55 Tuition Reimbursement
620 649900 Dragan, Bryce Principal Environmental Specialist 1,424.37 P3S Conference Seaside, CA 2/10-2/13/19
620 649900 Dragan, Bryce Principal Environmental Specialist 111.60 Carts for Division
160 673096 Duarte, Stephen P. Plant Operator 125.00 Certification Reimbursement
830 673096 Duarte, Stephen P. Plant Operator 119.55 Tuition Reimbursement
630 669581 Dudek,Marta A. Environmental Specialist 8,126.76 Tuition Reimbursement
160 541632 Durieux, Shelley J. Senior Human Resources Analyst 100.00 Certification Reimbursement
160 541632 Durieux, Shelley J. Senior Human Resources Analyst 150.00 Certification Reimbursement
160 681256 Escobar, Kevin A. Source Control Inspector 1 190.00 Certification Reimbursement
820 2007 Esquer, Mark A. Engineering Manager 894.36 CWEA Meeting Morro Bay, CA 7/27-7/29/18
160 2007 Esquer,Mark A. Engineering Manager 115.00 Certification Reimbursement
630 122340 Farmer,Michele Principal Environmental Specialist 1,892.34 AWWA Conference Nashville,TN 3/3- 3/8/19
110 122340 Farmer,Michele Principal Environmental Specialist 437.87 CWEA Annual Conference Palm Springs, CA 4/10-4/11/19
630 122340 Farmer,Michele Principal Environmental Specialist 205.00 Membership Renewal
630 122340 Farmer,Michele Principal Environmental Specialist 328.00 Membership Renewal
740 660287 Fenton,Justin M. Senior Engineer 664.68 WEF Conference Indianapolis, IN 6/1 -6/8/19
750 660287 Fenton,Justin M. Senior Engineer 2,324.67 Tuition Reimbursement
160 573221 Fernandez, Birger L. Engineer 200.00 Certification Reimbursement
760 573221 Fernandez, Birger L. Engineer 263.00 Membership Renewal
630 417172 Ferraro, Benjamin J. Senior Environmental Specialist 1,271.68 SETAC Annual Meeting Sacramento, CA 11/4- 11/8/18
830 2015 Ferry, Cynthia L. Administrative Assistant 248.68 BBQ Covers
630 404081 Finch, Joel C. Senior Environmental Specialist 2,606.28 Tuition Reimbursement
620 683796 Finkelstein, Brian P. Associate Engineer 1,287.82 P3S Conference Seaside, CA 2/10-2/13/19
160 2020 Fisher, Dean M. Engineering Manager 116.00 Certification Reimbursement
160 2020 Fisher, Dean M. Engineering Manager 150.00 Certification Reimbursement
160 2020 Fisher, Dean M. Engineering Manager 200.00 Certification Reimbursement
161 681088 Frattali, John M. Senior Safety Et Health Representative 126.32 HazMat Training Ontario, CA 3/26- 3/28/19
160 681088 Frattali, John M. Senior Safety Et Health Representative 170.00 Certification Reimbursement
160 681088 Frattali, John M. Senior Safety Et Health Representative 243.00 Certification Reimbursement
160 681088 Frattali, John M. Senior Safety Et Health Representative 270.00 Certification Reimbursement
875 675201 Freeman, Jesse M. Maintenance Specialist 294.84 Cross Connection Training Los Angeles, CA 1/28-2/1/19
160 675201 Freeman, Jesse M. Maintenance Specialist 275.00 Certification Reimbursement
870 675201 Freeman, Jesse M. Maintenance Specialist 182.00 Tuition Reimbursement
Prepared by: L.Henshaw
3of9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
160 336348 French,John W. Engineer 265.00 Certification Reimbursement
875 336348 French,John W. Engineer 130.00 Membership Renewal
875 336348 French,John W. Engineer 262.00 Membership Renewal
875 336348 French,John W. Engineer 270.00 Membership Renewal
110 648421 Frost,April Operations Supervisor 1,021.71 CWEA Annual Conference Palm Springs, CA 4/9-4/12/19
830 648421 Frost,April Operations Supervisor 7,035.00 Tuition Reimbursement
160 408049 Gabriel, Lawrence C Plant Operator 150.00 Certification Reimbursement
110 397301 Gadzinski,Joscelynn M. Plant Operator 381.30 Tri-State Conference Las Vegas, NV 9/25-9/27/18
840 397301 Gadzinski,Joscelynn M. Plant Operator 3,674.30 Tuition Reimbursement
110 681248 Garcia,Manuel E. Mechanic 532.37 Tri-State Conference Las Vegas, NV 9/24-9/27/18
820 681248 Garcia,Manuel E. Mechanic 333.79 CWEA Meeting Morro Bay, CA 7/27-7/29/18
880 678575 Gass, Beck T. Senior Mechanic 200.00 Membership Renewal
620 568641 Gerber, Harold T. Engineering Supervisor 158.00 Membership Renewal
620 568641 Gerber, Harold T. Engineering Supervisor 188.00 Membership Renewal
110 71221 Ghirelli, Robert P. Assistant General Manager 610.80 CASA Annual Conference Monterey, CA 8/8-8/10/18
760 497900 Gilbert,William L. Construction Inspection Supervisor 286.36 EduCode Training Las Vegas, NV 3/10- 3/12/19
160 131801 Gober, Charles F. Construction Inspector 365.00 Certification Reimbursement
4011700 131801 Gober, Charles F. Construction Inspector 109.46 Tools for Project J-117
160 184831 Gomez, Ruben A. Senior Construction Inspector 145.00 Certification Reimbursement
110 674689 Gonzales, Jed C. Maintenance Superintendent 744.69 WEFTEC Conference New Orleans, LA 9/29- 10/3/18
870 674689 Gonzales, Jed C. Maintenance Superintendent 995.00 Tuition Reimbursement
160 3022 Gonzalez, John G. Maintenance Supervisor 102.00 Certification Reimbursement
110 679041 Gonzalez,Victor Senior Mechanic 531.03 Tri-State Conference Las Vegas, NV 9/24-9/27/18
160 679041 Gonzalez,Victor Senior Mechanic 275.00 Certification Reimbursement
820 294491 Grande, Steve Senior Mechanic 322.89 CWEA Meeting Morro Bay, CA 7/27-7/29/18
630 459971 Haney, Lisa Regulatory Specialist 777.52 NACWA Winter Conference Albuquerque, NM 2/5-2/8/19
630 459971 Haney, Lisa Regulatory Specialist 859.88 CASA Winter Conference Indian Wells, CA 1/23- 1/25/19
630 459971 Haney, Lisa Regulatory Specialist 229.30 State Water Resources Control Board Meeting Sacramento, CA 10/23 - 10/24/18
830 11199 Haworth,Michael T. Operations Supervisor 110.95 Certification Reimbursement
160 384497 Hawthorne, Donald A. Reliability Maintenance Technician 135.00 Certification Reimbursement
830 274263 Hendy,Thomas S. Senior Plant Operator 224.12 Tuition Reimbursement
110 5019 Herberg, James D. General Manager 141.20 NACWA Annual Meeting Boston,MA 7/23-7/26/18
110 5019 Herberg, James D. General Manager 444.70 CASA Winter Conference Indian Wells, CA 1/23- 1/25/19
110 5019 Herberg, James D. General Manager 809.48 Lobby Days Meeting Washington, DC 6/17-6/19/19
110 675251 Hernandez,Angel J. Lead Instrumentation Technician 542.05 Tri-State Conference Las Vegas, NV 9/24-9/27/18
250 678399 Hino,Michael R. Senior Information Technology Analyst 731.22 ESRI Summit Palm Springs, CA 3/5- 3/7/19
110 678399 Hino,Michael R. Senior Information Technology Analyst 936.47 ESRI Conference San Diego, CA 7/10-7/12/18
220 663921 Hockensmith, Bryce K. Senior Accountant 47566.27 Tuition Reimbursement
870 627516 Hoffman, Richard W. Electrical Technician II 260.23 Boiler Training Oxnard, CA 5/14- 5/15/19
2009200 185885 Holdman, Robert Senior Construction Inspector 579.17 Equipment Testing for Project P2-92 Ashland, OH 8/13-8/16/18
160 674486 Hooks, Dereck L. Plant Operator 225.00 Certification Reimbursement
160 674486 Hooks, Dereck L. Plant Operator 230.00 Certification Reimbursement
220 172486 Hsiao, Lina Accounting Supervisor 417.76 GFOA Annual Conference Los Angeles, CA 5/20- 5/21/19
220 172486 Hsiao, Lina Accounting Supervisor 543.36 CSMFO Conference Palm Springs, CA 1/9- 1/11/19
160 172486 Hsiao, Lina Accounting Supervisor 120.00 Certification Reimbursement
160 487761 Huts,Michael R Lead Plant Operator 255.00 Certification Reimbursement
Prepared by: L.Henshaw
4of9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
160 487761 Huts,Michael R Lead Plant Operator 365.00 Certification Reimbursement
161 683948 Huynh, Brian Safety Et Health Representative 125.28 HazMat Training Ontario, CA 3/26- 3/28/19
161 683948 Huynh, Brian Safety Et Health Representative 1,153.85 Fall Protection Training San Diego, CA 6/23-6/27/19
160 298273 Jaime,Aurelio Senior Mechanic 255.00 Certification Reimbursement
840 664659 Jones, Christopher N. Plant Operator 295.00 Certification Reimbursement
110 683294 Jovenal,Jerome F. Source Control Inspector II 514.05 Tri-State Conference Las Vegas, NV 9/24-9/27/18
620 683294 Jovenal,Jerome F. Source Control Inspector II 1,348.91 P3S Conference Seaside, CA 2/10-2/13/19
110 9494 Kardos, Dionne Data Management Technician II 160.75 ESRI Conference San Diego, CA 7/11/18
160 9540 Kenerson, Roger A. Senior Plant Operator 150.00 Certification Reimbursement
160 121355 Khublall, Hardat S. Senior Engineer 200.00 Certification Reimbursement
750 121355 Khublall, Hardat S. Senior Engineer 200.00 Membership Renewal
630 670936 Kiang, Yen-Po Senior Environmental Specialist 7,631.20 Tuition Reimbursement
770 273084 Killion,Matthew J. Principal Information Technology Analyst 899.45 Software Training Pullman,WA 8/6-8/10/18
770 273084 Killion,Matthew J. Principal Information Technology Analyst 1,349.31 CISCO Live Conference San Diego, CA 6/10-6/13/19
770 273084 Killion,Matthew J. Principal Information Technology Analyst 833.75 RTAC Training Vacaville, CA 8/20-8/23/18
160 122201 Kim,Jin H. Engineer 115.00 Certification Reimbursement
110 617908 Kim, Peter L. Board of Directors 727.02 Lobby Days Meeting Washington, DC 6/17-6/19/19
160 110103 Kleinbergs, Mila S. Senior Engineer 115.00 Certification Reimbursement
120 667817 Knapp,Tina Assistant Clerk of the Board 378.31 Master Municipal Clerk Training San Jose, CA 2/5-2/11/19
120 667817 Knapp,Tina Assistant Clerk of the Board 1,312.02 CSDA Conference South Lake Tahoe, CA 10/21 - 10/25/18
250 150893 Krzysiak, Paul Principal Information Technology Analyst 319.59 Replace Disaster Recovery Equipment Las Vegas, NV 7/4-7/5/19
250 150893 Krzysiak, Paul Principal Info Tech Analyst 1,016.89 CISCO Live Conference San Diego, CA 6/9-6/14/19
110 577782 Kyi,May T. Senior Engineer 1,917.81 WEFTEC Conference New Orleans, LA 9/28- 10/7/18
160 577782 Kyi,May T. Senior Engineer 116.00 Certification Reimbursement
110 577782 Kyi,May T. Senior Engineer 725.00 WEFTEC Conference Registration
770 89914 Lapite, Elizabeth A. Administrative Assistant 1,442.70 Tuition Reimbursement
770 667614 Leak,Anthony D. Construction Inspector 173.00 Overcurrent Protection Training Reimbursement
160 80055 Lin,John H. Senior Engineer 115.00 Certification Reimbursement
140 655461 Long, Rebecca Senior Public Affairs Specialist 124.99 CASA Federal Legislative Meeting Sacramento, CA 12/7/19
140 655461 Long, Rebecca Senior Public Affairs Specialist 1,462.34 CASA DC Policy Forum Washington, DC 2/24-2/27/19
140 655461 Long, Rebecca Senior Public Affairs Specialist 126.87 Supplies for ACCOC Meeting 8 Tour
840 3532 Losurdo, Linda Administrative Assistant 136.83 Printer Toner
161 672587 Maldonado,Miguel A. Electrical Technician II 170.00 Safety Boots
160 385422 Mansell II, Selwyn D. Operations Supervisor 150.00 Certification Reimbursement
840 385422 Mansell II, Selwyn D. Operations Supervisor 111.41 Employee Appreciation Lunch
630 282589 Manzella, Joseph Principal Environmental Specialist 858.92 Environmental Accreditation Forum Milwaukee,WI 1/27- 1/31/19
630 282589 Manzella, Joseph Principal Environmental Specialist 2,381.25 Tuition Reimbursement
250 660666 Manzo,Mark A. Information Technology Analyst III 1,176.70 SharePoint Conference Las Vegas, NV 5/18- 5/23/19
160 153533 Maravilla, Laura Human Resources& Risk Manager 150.00 Certification Reimbursement
160 2033 Martinez, Denise M. Principal Human Resources Analyst 879.34 NEOGOV Conference Las Vegas, NV 10/9- 10/12/18
161 685521 Mauge, Lucien R. Safety Et Health Specialist 1,210.12 VPPPA Summit Tucson,AZ 4/14-4/18/19
160 2040 May,Todd A. Maintenance Specialist 100.00 Certification Reimbursement
160 676713 Mayne, Cory J. Electrical Technician I 275.00 Certification Reimbursement
620 2049 McKinley, Lorinda Senior Environmental Specialist 160.00 Membership Renewal
620 2049 McKinley, Lorinda Senior Environmental Specialist 199.00 Membership Renewal
620 2049 McKinley, Lorinda Senior Environmental Specialist 200.00 Membership Renewal
Prepared by: L.Henshaw
5of9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
870 643241 McMurdy, Adam M. Senior Mechanic 230.80 Tuition Reimbursement
840 528825 Melby,Mark Operations Supervisor 735.48 Tuition Reimbursement
110 624016 Mendez,Marcos D. Data Management Technician II 629.05 ESRI Conference San Diego, CA 7/11 -7/12/18
630 73445 Meregillano,Tom B. Senior Regulatory Specialist 855.61 WEF Biosolids Conference Ft. Lauderdale, FL 5/7- 5/10/19
630 73445 Meregillano,Tom B. Senior Regulatory Specialist 831.99 CASA Annual Conference Monterey, CA 8/7-8/9/18
630 73445 Meregillano,Tom B. Senior Regulatory Specialist 122.25 CASA Meeting Sacramento, CA 7/11/18
250 149155 Michaels, Robert Information Technology Supervisor 602.08 MISAC Conference Rancho Mirage, CA 9/30- 10/3/18
110 149155 Michaels, Robert Information Technology Supervisor 645.08 ESRI Conference San Diego, CA 7/10-7/11/18
710 4049 Millea, Kathleen T. Director of Engineering 623.87 AAEES Awards Conference Washington, DC 4/24-4/28/19
160 4049 Millea, Kathleen T. Director of Engineering 115.00 Certification Reimbursement
840 131684 Milligan, Shane P. Power Plant Operator II 188.00 Membership Renewal
750 574944 Mohr,Jeffrey D. Engineering Manager 129.00 Membership Renewal
750 574944 Mohr,Jeffrey D. Engineering Manager 320.00 Membership Renewal
110 574944 Mohr, Jeffrey D. Engineering Manager 550.00 WEFTEC Conference Registration
875 124661 Moinuddin, Riaz K. Engineering Manager 203.00 Membership Renewal
760 664843 Moore, Brad A. Senior Engineer 956.01 NASTT Conference Chicago, IL 3/17- 3/20/19
160 664843 Moore, Brad A. Senior Engineer 115.00 Certification Reimbursement
110 37014 Murthy, Umesh N. Engineering Supervisor 607.41 Tri-State Conference Las Vegas, NV 9/24-9/27/18
160 37014 Murthy, Umesh N. Engineering Supervisor 162.00 Certification Reimbursement
160 37014 Murthy, Umesh N. Engineering Supervisor 200.00 Certification Reimbursement
110 64362 Myers, Dawn K. Senior Environmental Specialist 103.00 CWEA Annual Conference Palm Springs, CA 4/10/19
630 64362 Myers, Dawn K. Senior Environmental Specialist 201.51 Fed Ex Shipping Costs
630 64362 Myers, Dawn K. Senior Environmental Specialist 174.75 Tuition Reimbursement
160 671891 Namini, Shahrzad F. Senior Engineer 115.00 Certification Reimbursement
750 671891 Namini, Shahrzad F. Senior Engineer 175.00 Membership Renewal
160 653749 Nasrollahi, Nasrin Senior Engineer 115.00 Certification Reimbursement
160 123781 Nau,Andrew H. Human Resources Supervisor 678.41 CALPERLA Conference Monterey, CA 12/4- 12/7/18
160 289220 Navarrette, Derek G. Automotive/Heavy Equip Technician 157.20 Certification Reimbursement
0207200 4501 Nazaroff,Adam A. Engineering Supervisor 125.00 ASCE Awards Dinner Anaheim, CA 2/21/19
160 4501 Nazaroff,Adam A. Engineering Supervisor 115.00 Certification Reimbursement
740 4501 Nazaroff,Adam A. Engineering Supervisor 170.25 Employee Appreciation Lunch
740 4501 Nazaroff,Adam A. Engineering Supervisor 139.41 Employee Appreciation Lunch
160 4008 Nguyen, Huan-Hoang Senior Engineer 115.00 Certification Reimbursement
250 671171 Nguyen,Man D. Information Technology Analyst III 192.00 SANS Network Training Anaheim, CA 2/11 -2/16/19
250 671171 Nguyen,Man D. Information Technology Analyst III 1,125.24 EnCase Discovery Training Pasadena, CA 6/24-6/28/19
250 671171 Nguyen,Man D. Information Technology Analyst III 1,649.66 SANS Conference San Diego, CA 11/11 - 11/17/18
110 4010 Nguyen, Quynh D. Engineering Associate 325.64 ESRI Conference San Diego, CA 7/10-7/11/18
160 168381 Padilla, Gilbert Senior Mechanic 275.00 Certification Reimbursement
250 662063 Paik, Sang Principal Information Technology Analyst 1,145.79 Quayls Conference Las Vegas, NV 11/11 - 11/15/18
250 662063 Paik, Sang Principal Information Technology Analyst 1,664.78 SANS Conference San Diego, CA 5/8- 5/13/19
160 609191 Palazuelos, Raul R. Construction Inspector 500.00 Certification Reimbursement
160 609191 Palazuelos, Raul R. Construction Inspector 569.53 Certification Reimbursement
160 103851 Patel,Madankumar B. Senior Engineer 116.00 Certification Reimbursement
160 103851 Patel,Madankumar B. Senior Engineer 116.00 Certification Reimbursement
250 125233 Patel, Purvi R. Senior Information Technology Analyst 298.29 Disaster Recovery Site Visit Las Vegas, NV 12/19- 12/20/18
820 687041 Patlan, Emanuel Maintenance Worker 206.38 Lodging during Main St. Emergency 2/13/19
Prepared by: L.Henshaw
6of9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
630 642521 Pavia, Paulo R. Senior Environmental Specialist 6,922.21 Tuition Reimbursement
630 3539 Phonsiri,Vanh Principal Environmental Specialist 994.61 SETAC Annual Meeting Sacramento, CA 11/4- 11/7/18
110 3540 Phuong, Ddaze Lead Plant Operator 782.71 Tri-State Conference Las Vegas, NV 9/24-9/27/18
110 3540 Phuong, Ddaze Lead Plant Operator 307.22 CWEA Annual Conference Palm Springs, CA 4/9-4/12/19
750 277093 Pilko,Victoria Construction In Progress Project Manager 100.00 OCEC Award Banquet 2/16/19
110 667956 Powell,Jonathon E. Associate Engineer 962.00 CWEA Annual Conference Palm Springs, CA 4/8-4/12/19
110 667956 Powell,Jonathon E. Associate Engineer 374.11 ESRI Conference San Diego, CA 7/11 -7/12/18
620 667956 Powell,Jonathon E. Associate Engineer 547.00 P3S Conference Seaside, CA 2/10-2/13/19
160 667956 Powell,Jonathon E. Associate Engineer 179.00 Certification Reimbursement
160 664608 Preciado, Elvira Plant Operator 150.00 Certification Reimbursement
160 675673 Radvar, Giti Senior Engineer 115.00 Certification Reimbursement
760 669484 Ramos, Gloria Administrative Assistant 7,122.00 Tuition Reimbursement
750 664851 Ratto, Valerie I. Senior Engineer 670.15 CWEA Board of Directors Meeting La Jolla, CA 1/24- 1/26/19
110 664851 Ratto,Valerie I. Senior Engineer 1,599.64 CWEA Annual Conference Palm Springs, CA 4/8-4/12/19
830 3558 Reed, Brian K. Principal Environmental Specialist 707.31 Optical Gas Imaging Training Phoenix,AZ 2/11 -2/14/19
630 682726 Renick,Violet M. Senior Scientist 1,009.35 SETAC Annual Meeting Sacramento, CA 11/4- 11/7/18
160 633457 Riley, Cory J. Plant Operator 150.00 Certification Reimbursement
630 4076 Robertson, George L. Senior Scientist 857.92 IEEEC Conference San Diego, CA 3/1 - 3/13/19
630 4076 Robertson, George L. Senior Scientist 469.09 Oceanology International Conference San Diego, CA 2/25-2/27/19
630 667729 Robledo, Joseph P. Senior Environmental Specialist 1,270.00 Tuition Reimbursement
840 255775 Rocha, Milton Lead Plant Operator 1,332.99 Tuition Reimbursement
160 4077 Rodriguez, David Engineer 102.00 Certification Reimbursement
160 4077 Rodriguez, David Engineer 102.00 Certification Reimbursement
160 4077 Rodriguez, David Engineer 115.00 Certification Reimbursement
160 4077 Rodriguez, David Engineer 200.00 Certification Reimbursement
760 4077 Rodriguez, David Engineer 188.00 Membership Renewal
870 651807 Rosas, Henry M. Lead Electrical Technician 234.16 Raypak(HVAC)Training Oxnard, CA 7/24-7/25/18
160 680077 Rose, George M. Power Plant Operator II 165.00 Certification Reimbursement
830 680077 Rose, George M. Power Plant Operator II 180.00 Membership Renewal
875 109250 Sabri, Julian F. Engineering Supervisor 141.75 Approach to Leadership Training Anaheim, CA 4/2/19
875 109250 Sabri, Julian F. Engineering Supervisor 270.75 PMI Conference Los Angeles, CA 10/2- 10/5/18
630 4085 Sakamoto, Ken A. Senior Environmental Specialist 260.77 ESRI GIS Forum Redlands, CA 11/6- 11/8/18
110 4085 Sakamoto, Ken A. Senior Environmental Specialist 352.89 ESRI Conference San Diego, CA 7/10-7/11/18
630 4085 Sakamoto, Ken A. Senior Environmental Specialist 200.76 Food for Nerrisa Trawl
630 4085 Sakamoto, Ken A. Senior Environmental Specialist 337.09 Food for Nerrisa Trawl
630 4085 Sakamoto, Ken A. Senior Environmental Specialist 200.20 Food for Nerrisa Trawl
630 4085 Sakamoto, Ken A. Senior Environmental Specialist 418.87 Food for Nerrisa Trawl
630 4085 Sakamoto, Ken A. Senior Environmental Specialist 385.00 Food for Nerrisa Trawl
250 624032 Saqui,Annalisa S. Information Technology Analyst III 259.08 ESRI GIS Forum Redlands, CA 11/7/18
110 624032 Saqui,Annalisa S. Information Technology Analyst III 917.61 ESRI Conference San Diego, CA 7/10-7/12/18
820 107553 Savedra, Ernest R. Lead Mechanic 346.87 CWEA Meeting Morro Bay, CA 7/27-7/29/18
140 177501 Schiefelbein, Cheryl Administrative Assistant 225.00 Postal Business Reply Mail account renewal
880 501059 Schuler, Kevin A. Maintenance Superintendent 623.30 SMRP Conference Orlando, FL 10/22- 10/30/18
160 501059 Schuler, Kevin A. Maintenance Superintendent 102.00 Certification Reimbursement
160 501059 Schuler, Kevin A. Maintenance Superintendent 250.00 Certification Reimbursement
880 501059 Schuler, Kevin A. Maintenance Superintendent 170.00 Membership Renewal
Prepared by: L.Henshaw
7of9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
160 366053 Scott, Gregg A. Plant Operator 110.00 Certification Reimbursement
110 156540 Shawver, David Board of Directors 534.06 CASA Winter Conference Indian Wells, CA 1/23- 1/25/19
110 156540 Shawver, David Board of Directors 1,787.79 CASA Annual Conference Monterey, CA 8/7-8/10/18
110 156540 Shawver, David Board of Directors 286.44 Urban Water Conference Palm Springs, CA 2/27- 3/1/19
110 156540 Shawver, David Board of Directors 240.12 Lobby Days Meeting Sacramento, CA 4/4/19
110 156540 Shawver, David Board of Directors 289.33 Urban Water Conference San Diego, CA 8/22-8/24/18
160 4103 Shelp, Curt V. Operations Supervisor 150.00 Certification Reimbursement
161 4103 Shelp, Curt V. Operations Supervisor 154.98 Safety Boots
160 674494 Siddiqui, Shaun A. Plant Operator 190.00 Certification Reimbursement
830 674494 Siddiqui, Shaun A. Plant Operator 218.55 Tuition Reimbursement
161 683809 Singh, Justin R. Safety Et Health Representative 128.06 Hazard WEtM Training Ontario, CA 3/26- 3/28/19
161 683809 Singh, Justin R. Safety Et Health Representative 286.46 OSHA Training San Diego, CA 3/4- 3/6/19
160 683809 Singh, Justin R. Safety Et Health Representative 478.00 Certification Reimbursement
830 672843 Sobhani, Reza Associate Engineer 679.73 WEFTEC Conference Atlanta, GA 2/6-2/8/19
110 672843 Sobhani, Reza Associate Engineer 117.80 CWEA Annual Conference Palm Springs, CA 4/11/19
160 5038 Sohanaki, Roya Engineering Manager 115.00 Certification Reimbursement
110 497512 Solis, Robert C. Senior Mechanic 532.37 Tri-State Conference Las Vegas, NV 9/24-9/27/18
160 497512 Solis, Robert C. Senior Mechanic 195.00 Certification Reimbursement
620 668027 Soriano, Melissa B. Source Control Inspector 1 5,540.96 Tuition Reimbursement
875 351425 Speakman, Steven R. Senior Engineer 195.85 PMI Conference Los Angeles, CA 10/2- 10/5/18
160 5043 Spears, James Operations Manager 150.00 Certification Reimbursement
620 131422 Stacklin, Christopher A. Engineer 963.67 WEFTEC Conference Atlanta, GA 2/5-2/8/19
110 131422 Stacklin, Christopher A. Engineer 2,350.93 WEFTEC Conference New Orleans, LA 9/28- 10/4/18
160 680472 Stewart, James W. Engineer 116.00 Certification Reimbursement
770 680472 Stewart, James W. Engineer 130.00 Membership Renewal
880 336276 Stokes, Don F. Maintenance Manager 1,042.52 International Maintenance Conference Bonita Springs, FL 12/9- 12/13/18
160 336276 Stokes, Don F. Maintenance Manager 102.00 Certification Reimbursement
160 336276 Stokes, Don F. Maintenance Manager 150.00 Certification Reimbursement
160 336276 Stokes, Don F. Maintenance Manager 215.00 Certification Reimbursement
820 336276 Stokes, Don F. Maintenance Manager 170.00 Membership Renewal
161 680659 Stone, Jereme J. Senior Safety Et Health Representative 160.76 Lead Inspector Training Anaheim, CA 12/17- 12/21/18
160 680659 Stone, Jereme J. Senior Safety Et Health Representative 135.00 Certification Reimbursement
161 680659 Stone, Jereme J. Senior Safety Et Health Representative 5,980.00 Tuition Reimbursement
820 253649 Stratmoen, Erik D. Lead Mechanic 532.37 Tri-State Conference Las Vegas, NV 9/24-9/27/18
160 253649 Stratmoen, Erik D. Lead Mechanic 102.00 Certification Reimbursement
110 670653 Suan,Allan Data Management Technician I 174.81 ESRI Conference San Diego, CA 7/10/18
760 676254 Suchor, Glenn W. Senior Construction Inspector 105.00 Membership Renewal
250 5057 Swindler, John W. Information Technology System Et Operations Manager 773.89 Cornerstone Training San Diego, CA 6/3-6/5/19
250 5057 Swindler, John W. Information Technology System Et Operations Manager 257.50 Cyber Security Symposium San Diego, CA 4/1 -4/2/19
110 639103 Tagumasi, Romeo V. Data Management Technician II 169.47 ESRI Conference San Diego, CA 7/10/18
110 366352 Tang, Luc H. Senior Mechanic 575.95 Tri-State Conference Las Vegas, NV 9/24-9/27/18
880 366352 Tang, Luc H. Senior Mechanic 5,220.00 Tuition Reimbursement
160 679682 Tao, Jacqueline Plant Operator 180.00 Certification Reimbursement
880 672827 Taula, Eti Maintenance Supervisor 238.93 Cross Connection Training Los Angeles, CA 1/28-2/1/19
875 668810 Terrell, Brian D. Engineer 3,417.54 Advanced Vibration Analysis Training San Diego, CA 3/11 - 3/15/19
160 668810 Terrell, Brian D. Engineer 115.00 Certification Reimbursement
Prepared by: L.Henshaw
8of9
8/2/2019
Orange County Sanitation District
Government Code 5 53065-5, Public Disclosure Reports- Reimbursements by OCSD
July 1, 2018 through June 30, 2019
Div. Emp# Name Title Amount Description Site Location Duration
160 668810 Terrell, Brian D. Engineer 300.00 Certification Reimbursement
630 130850 Terriquez, Laura A. Senior Environmental Specialist 205.37 ESRI GIS Forum Redlands, CA 11/6- 11/8/18
710 2547 Thompson, Robert C. Assistant General Manager 100.00 ASCE Awards Dinner Anaheim, CA 2/21/19
710 2547 Thompson, Robert C. Assistant General Manager 2,056.78 WaterReuse Symposium Austin,TX 9/7-9/12/18
160 2547 Thompson, Robert C. Assistant General Manager 115.00 Certification Reimbursement
810 2547 Thompson, Robert C. Assistant General Manager 140.00 Food for 08M Meeting
870 83387 Thornburg, Steven M. Maintenance Supervisor 505.55 SMRP Conference Orlando, FL 10/22- 10/25/18
760 682718 Tran, Bao Q. Engineer 188.00 Membership Renewal
250 664763 Trang, Loc T. Senior Information Technology Analyst 1,094.13 HPE Discover Conference Las Vegas, NV 6/17-6/20/19
110 2533 Tsai, Yu-Li Senior Scientist 119.82 CWEA Annual Conference Palm Springs, CA 4/11/19
630 2533 Tsai, Yu-Li Senior Scientist 1,816.47 ASM Microbe Conference San Francisco, CA 6/20-6/24/19
160 116732 Tuiasosopo-Kemper, Gary J. Operations Supervisor 110.00 REIMB WASTEWATER CERT
230 526707 Velasco, Jesse R. Lead Storekeeper 209.49 Tuition Reimbursement
630 381801 Vellucci, Hai-Thao H. Senior Environmental Specialist 178.25 Biosolids Site Visit Yuma,AZ 6/24-6/25/19
630 381801 Vellucci, Hai-Thao H. Senior Environmental Specialist 211.40 Biosolids Site Visit Yuma,AZ 7/23-7/24/18
160 381801 Vellucci, Hai-Thao H. Senior Environmental Specialist 165.00 Certification Reimbursement
630 381801 Vellucci, Hai-Thao H. Senior Environmental Specialist 180.00 Membership Renewal
160 273447 Voss, Betty J. Senior Buyer 250.00 Certification Reimbursement
250 684182 Vu,Thomas T. Information Technology Analyst II 800.78 Cornerstone Training San Diego, CA 6/3-6/5/19
160 2515 Vuong,Michael Operations Supervisor 150.00 Certification Reimbursement
760 678971 Wable, Milind V. Senior Engineer 1,086.04 CWEA Annual Conference Palm Springs, CA 4/9-4/10/19
160 678971 Wable, Milind V. Senior Engineer 200.00 Certification Reimbursement
250 649918 Weedagama,Wasantha Principal Information Technology Analyst 1,213.54 SharePoint Conference Las Vegas, NV 5/18- 5/23/19
250 683905 Weinberg,April L. Information Technology Analyst III 728.16 Maximo Training San Diego, CA 11/5- 11/7/18
250 683905 Weinberg,April L. Information Technology Analyst III 1,082.72 Rules Manager Training San Diego, CA 2/18-2/22/19
840 388949 White,Allen J. Senior Plant Operator 237.10 Tuition Reimbursement
770 569686 Whitney, Robert M. Senior Construction Inspector 567.43 Equipment Testing for Project FE15-07 Pittsburgh, PA 12/10- 12/13/18
770 569686 Whitney, Robert M. Senior Construction Inspector 733.63 Equipment Testing for Project FE15-07 Pittsburgh, PA 2/18-2/22/19
770 569686 Whitney, Robert M. Senior Construction Inspector 274.87 Equipment Testing for Project FE15-07 Reno, NV 12/17- 12/18/18
770 569686 Whitney, Robert M. Senior Construction Inspector 1,833.80 NFPA Conference San Antonio,TX 6/16-6/20/19
770 569686 Whitney, Robert M. Senior Construction Inspector 105.00 Membership Renewal
110 415193 Withers,John B. Board of Directors 208.35 CASA Winter Conference Indian Wells, CA 1/23- 1/24/19
110 415193 Withers,John B. Board of Directors 802.96 Lobby Days Meeting Washington, DC 6/17-6/19/19
160 584561 Wyland, Ryan M. Plant Operator 225.00 Certification Reimbursement
160 584561 Wyland, Ryan M. Plant Operator 295.00 Certification Reimbursement
160 90413 Yager, David M. Source Control Inspector II 179.00 Certification Reimbursement
160 682700 Yanez,Victor J. Engineer 115.00 Certification Reimbursement
740 351409 Yin, Shuang Senior Engineer 154.23 AAES Training Event Los Angeles, CA 10/18- 10/19/18
160 351409 Yin, Shuang Senior Engineer 200.00 Certification Reimbursement
630 121224 Yokoyama, Brandon K. Environmental Technician 655.00 Tuition Reimbursement
160 573247 Yong, Eros Engineering Manager 115.00 Certification Reimbursement
160 573247 Yong, Eros Engineering Manager 200.00 Certification Reimbursement
110 8230 Zedek,Michael I. Engineer 283.93 ESRI Conference San Diego, CA 7/11 -7/12/18
620 8230 Zedek,Michael I. Engineer 1,150.84 Tuition Reimbursement
$270,781.87
Prepared by: L.Henshaw
9of9
8/2/2019
oJ�V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
LEGISLATIVE AND PUBLIC AFFAIRS (714)5937433
COMMITTEE
9oTFCTN0 THE
Agenda Report
File #: 2019-604 Agenda Date: 9/25/2019 Agenda Item No: 14.
FROM: James D. Herberg, General Manager
SUBJECT:
PUBLIC AFFAIRS UPDATE FOR THE MONTHS OF JULY AND AUGUST 2019
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file the Public Affairs Update for the months of July and August 2019.
BACKGROUND
Staff will provide an update on recent public affairs activities.
RELEVANT STANDARDS
• Maintain influential legislative advocacy and a public outreach program
• Build brand, trust, and support with policy makers and community leaders
• Maintain collaborative and cooperative relationships with regulators, stakeholders and
neighboring communities
• Listen to and seriously consider community input on environmental concerns
PROBLEM
Many Californians are not aware of the Orange County Sanitation District (Sanitation District) and the
important work we do to keep the environment clean by using the wastewater byproducts to create
energy, water recycling, and the use of biosolids.
In general, the community and businesses do not realize that when they improperly dispose of waste
into the sanitation system, it can negatively affect the work we do and the quality of water we supply
for the Groundwater Replenishment System.
PROPOSED SOLUTION
By providing tours, community outreach, education, and general communication via the Sanitation
District's website, social media outlets, and mainstream media, we have the ability to educate the
community, local agencies, and businesses on the What2Flush program, energy production, water
recycling, biosolids, and our source control program. This, in turn, results in a better quality of
Orange County Sanitation District Page 1 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-604 Agenda Date: 9/25/2019 Agenda Item No: 14.
wastewater.
TIMING CONCERNS
N/A
RAMIFICATIONS OF NOT TAKING ACTION
If we do not educate the community, local agencies, and the area businesses about the Sanitation
District, we lose an opportunity to educate thousands of people about our plants, source control, and
the wastewater industry as a whole.
PRIOR COMMITTEE/BOARD ACTIONS
N/A
ADDITIONAL INFORMATION
July/August 2019
Activity ft ft of Guests
OCSD/OCWD Tours 3 71
OCSD Tours 23 406
Speaking Engagements 1 P0
Events 50
Current Activities - July/August 2019
65th Anniversary Open House
The Sanitation District celebrated our 65th Anniversary by having an Open House with booths,
games, tours, and more. Over 500 people come to the event with 224 people taking tours. We had
170 volunteers that day.
Ribbon Cutting for the Sanitation District Centrifuge Facility
We celebrated and toured the Sanitation District's centrifuges, with a ribbon cutting the same day as
the Open House. We had over 50 people in attendance from legislative staffers, legislative
delegates, and the Board of Directors, to name only a few.
Construction Outreach
The State College Sewer Construction project in the City of Anaheim has installed about 50
percent of the pipe thus far. Multiple crews are working along the project alignment to expedite
construction and minimize impact to the community. Construction on the northern end of the project
started this month. Activity is now taking place just south of the 91 freeway and between Ball Road
and Vermont Avenue. Neighborhood Bulletins have been distributed to various areas of the project
to keep the community informed of the construction activities and the upcoming schedule.
Orange County Sanitation District Page 2 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-604 Agenda Date: 9/25/2019 Agenda Item No: 14.
Earlier this summer, a community survey was distributed to 14,000 residents, businesses, and
schools, in the Seal Beach, Los Alamitos, and Rossmoor neighborhoods regarding the upcoming
Los Alamitos Trunk Sewer project. The purpose of the survey was to gather feedback from the
community in regards to work hours and work days. The results were outstanding and were shared
with the permitting agencies as a part of the design review. This was a great introduction for the
community to learn about the Sanitation District and the upcoming project scheduled to begin in
2020.
In early August, a valve at the MacArthur Pump Station in the City of Irvine was replaced. While
this is considered routine maintenance, a lot of coordination and planning went into the execution of
the work. The pump station is located next to John Wayne Airport and, as such, it is a busy area.
The activity required 24/7 traffic control over a weekend, and over 2,000 feet of above ground bypass
which always carries a level of risk. The work was completed ahead of schedule and without any
issues.
As part of the Plant No. 2 Outreach Program, a summer issue of the Neighborhood Connection
newsletter was distributed to 1,400 homes around Plant No. 2 in Huntington Beach, Newport Beach,
and Costa Mesa. We also held a Plant No. 2 tour in August where we invited the neighbors to attend
and see what goes on behind the wall.
Public Scope Meetings
The Sanitation District has begun preparation of the Program Environmental Impact Report to
evaluate the potential impacts associated with implementation of its 2017 Wastewater Collection and
Treatment Facilities Master Plan, which was updated in 2019. The proposed Facilities Master Plan
includes over 80 projects that will take place over the next 20 years at both of our plants and
throughout the service area. Two public scoping meetings were held, one at Plant No. 1 and one at
Plant No. 2, to solicit feedback from the public. Also, for the first time ever, we offered the option of
joining the meetings via an online webinar.
The Sanitation District Attends CASA Conference
The Board Chairman and General Manager attended the California Association of Sanitation
Agencies annual conference in San Diego, August 21-23. They attended sessions covering state
and federal legislative updates, crisis communication, and climate change financial impacts. Lan
Wiborg, Director of Environmental Services, and Lisa Haney, Regulatory Specialist, gave a
presentation on developing opportunities to create new water sources.
Upcoming Events:
VIP Luncheon
On September 10, the Sanitation District will host its VIP Luncheon where over 100 employees and
retirees are invited to a special lunch and thanked for all their efforts in volunteering by giving tours,
working at community events, and doing speaking engagements over the past year.
CEQA
N/A
FINANCIAL CONSIDERATIONS
Orange County Sanitation District Page 3 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-604 Agenda Date: 9/25/2019 Agenda Item No: 14.
N/A
ATTACHMENT
The following attachment(s)may be viewed on-line at the OCSD website (www.ocsd.com) with the complete agenda
package:
• Outreach Report July-August 2019
• Media Clips July-August 2019
• September 9, 2019 Legislative and Public Affairs Committee Presentation
Orange County Sanitation District Page 4 of 4 Printed on 9/19/2019
powered by LegistarTM
Outreach Report July/August
Date Event Attendees
7/11/2019 CSUF Nursing Tour 27
7/17/2019 Green Tech UCI Tour 15
7/24/2019 San Domenico HS Teachers Tour 22
7/25/2019 CSUF Nursing tour 24
7/27/2019 OCSD Open House Tours 225
7/27/2019 Open House Event 275
7/27/2019 Ribbon Cutting Event 50
7/30/2019 New Employee/Open Tour 20
7/30/2019 Las Virgenes Water Tour 7
7/31/2019 Society of Plumbing Engineers Tour 32
7/31/2019 OC Employee Tour 6
8/5/2019 ASCE-OC Tour 21
8/7/2019 Mayor Foley Tour 3
8/13/2019 Operator Class III Tour 15
8/14/2019 CSUF STEM Tour 30
8/16/2019 Plant 2 Tour 5
8/21/2019 ABCUA Tour 3
8/21/2019 OCWD Speaking Engagement 80
8/22/2019 Congressman Rouda Staff Tour 2
8/28/2019 Director Chafee tour 8
8/29/2019 JAPU Nursing Tour 20
Table of Contents
CONSTRUCTION................................................... ................... PAGE 1
July 30, 2019
Car runs into construction equipment in Anaheim
By: Alma Fausto
Orange County Register
GWRS................................................... ............................... PAGE 3
July 24, 2019
Wastewater Treatment with reverse osmosis for sustainability
By: Forester Media Staff
Forester Media
HUMANINTEREST.................................................................... PAGE 6
June 13, 2019
As Californians save more water, their sewers get less and that's a
problem
By: Gary Pitzer
Water Education Foundation
June 26, 2019
Local Beaches Get High Marks
By: Martin Wisckol
Orange County Register
July 19, 2019
Seal Beach prepares for flooding
By: Martin Wisckol
Orange County Register
July 31, 2019
Would you drink desalinated seawater?
By: Amanda Little
Looking for the Light.com
HUMAN INTEREST CONT.................................................... ...... PAGE 24
Aug 5, 2019
OCSD's Centrifuge Facility Ribbon Cutting Ceremony
By: Michelle Steel
Supervisor Michelle Steel 2"d District Updates
TWITTER POSTINGS ................................................................ PAGE 26
FACEBOOK POSTINGS ............................................................PAGE 28
INSTAGRAM POSTINGS............................................................PAGE 32
MonthlyClippingsNews
Q_ s'
o
THE EN
July/August 2019
OCS D Public Affairs Office
OC Register
July 30, 2019
OPAN_GE COUNTY
� D 1 �
Car runs into construction equipment in
Anaheim, knocking worker into 20-foot-deep
hole
By Alma Fausto I afausto@scng.com I Orange County Register
PUBLISHED: July 30, 2019 at 1:00 am I UPDATED: July 30, 2019 at 8:09 am
Firefighters rescued an injured worker from a 20-feet-deep hole he was knocked into after a
car crashed into a construction site in Anaheim Monday night, July 29, authorities said.
Urban search-and-rescue teams from Anaheim and Orange were called out to the scene,
at State College Boulevard and Ball Road, shortly after the 10:30 p.m. crash, said Battalion
Chief Tim Sandifer of Anaheim Fire & Rescue.
"The victim had been performing some shoring work in preparation for some sewer
reconstruction," Sandifer said.
A driver then crashed into the construction site, hitting some equipment, and caused the
worker to fall into the hole.
He had some musculoskeletal injuries and couldn't get out himself, Sandifer said.
Within about an hour, rescuers were able to lift the worker out using a basket and take him
to a trauma center.
The uninjured driver left the car but was taken into custody by police about a block away.
The cause of the crash was under investigation.
- � �.
I �
�� ii �' ; �
i
•
l
Ft�~..�, � S�l,-
��� _ ice✓�.. - � `� � .
-r
�w"�,. _
•
FForesteredia
19
Wastewater Treatment With Reverse
Osmosis for Sustainability
As the world moves further towards dangerously low water levels, it demands a solution that can
quench the thirst of millions while still maintaining ecological balance.
FORESTER MEDIA
JULY 24,2019
Earlier in June, a large aquifer was found just off the northeast shore of the U.S. near New York.
It is said that the aquifer contains enough water to fill 1.1 billion Olympic swimming pools. This
new finding has opened a door to the possibility of more such aquifers hidden beneath the
seabeds across the globe. While it is definitely some good news, it is important to note that this
cannot be the only alternative to the ever-increasing problem of shortages. And after years of
experimenting with various methods, ignoring the idea of recycling wastewater for drinking, it
turns out the world today is turning towards just that.
Sammy Farag, CEO of AMPAC USA agrees, "Using rejected water through sewage treatment was
not acceptable by many around 10 years ago. But look at the situation today, countries and
companies have begun using it to fulfill their needs and not many have a problem. The change
from the past 10 years is that the shortage of such an essential element was not a pressing matter
then. Today,you cannot turn a page in the newspaper or ignore a post on your phones about the
water crisis and climate change."
3
And it seems to be as real as it can get. BBC released a possible list of cities that are in danger of
running out of essential water to drink, and in the past year, more cities have been added to the
list. All over the world, cities are either waiting for the dark clouds to pour some rain in a
drought or struggling for their lives while running from floods. The climate has gone haywire
all over the world and the mismanagement of water could be a contributing cause. Here is
where sewage treatment can help with the troubles.
Wastewater Treatment
This is a procedure where rejected water from industries, or possibly an entire city, is brought
to a facility to be treated. The water goes through an elaborate process of filtration, which,
today, is most commonly reverse osmosis. While the process does have its own downsides
related to rejection, it never disappoints in quality, which is probably why the requirements to
get such plants or systems installed in industries is a topic gaining heat.
"AMPAC USA,for the past 30 years, has been serving customers with the best quality wastewater
treatment systems.And we can easily say the orders have skyrocketed in the past five years.
Before, not many customers opted for these products because of the taboo associated with it,"
says Farag.
But what could be the reason for a sudden change in its popularity?
"The major reason can be associated with the increasing price of water for industries and the
decreased availability. Countries and businesses both began working out strategies that could
help them save water and money, respectively.Additionally,for industries, it could be a way of
getting in the good graces of their customers and regulatory authorities, as governments began
giving incentives for sustainability. It is a good cause, and so it had to eventually gain popularity,"
added Farag.
And this does reflect in the number of industries that have opted for a wastewater
treatment solution as part of their strategy to satisfy their needs.
The Rejected Becomes The Accepted
The acceptance began when a large beer brewing company showcased its products made from
reclaimed water. Stone Brewing Company is near San Diego and is one of the largest in
California. They worked with the treatment plant in the city to make beer. The program, called
Pure Water San Diego, led to the launch of Full Circle Pale Ale, which was a beer made from
reclaimed waters in San Diego. This was in 2017 when San Diego officials, including Mayor
Kevin Faulconer, were happy with the experiment and hoped, together, they could achieve
their goal of providing one-third of the city's demand from reclaimed waters by 2035. Although
A
this experiment was only for the event, local brewery owners did take notice. Coming from a
big company like Stone, other smaller breweries began investing in treatment systems that
turn waste into pure drinking water.
"And especially for beer breweries, it is a win-win!Every brewer will tell you that water controls
the taste of beer and so if they could use reclaimed water for their production, it could give their
beer unique taste. This can easily give them an edge over their other competitors," says Farag.
Positive Reception
It seems that countries all over the world are now warming up to this process that
employs reverse osmosis for purification. The two biggest industries in China, for instance,
currently employ reverse osmosis for recycling their waste. The coal and chemical industry in
the country faced many challenges while employing the process, but it eventually led them to
innovative RO elements. Even in India, the capital New Delhi has now installed new sewage
treatment plants to provide for the city each day. The good news is now everyone is working
towards making potable water available, not only to people or for industries but for the planet
too.
Disneyland recycles wastewater for all its rides and has been in partnership with the Orange
County Water District (OCWD) for 10 years now. The water used in the park goes to the
OCWDs Groundwater Replenishment System, which ensures regular refills of aquifers. The
County does it by using state-of-the-art treatment systems. While Disneyland takes a different
approach, most of the entertainment parks install industrial Reverse Osmosis Systems for clean
and healthy rides each day.
Indeed, it seems if countries put their resources into building such treatment facilities, the
growing distress on the world could decrease to an extent. If this alternative has positive
effects on the issues of today, it can help build a sustainable future for everyone.
5
Western Water
June 13, 2019
WATEk EDUCATION
F 0 U N D A T 1 0 N
Western Water June 13, 2019 Gary Pitzer
As Californians Save More Water, Their Sewers
Get Less and That's a Problem
WESTERN WATER NOTEBOOK: Lower flows damage equipment, concentrate waste and stink up
neighborhoods; should water conservation focus shift outdoors?
i s•
Corrosion is evident in this wastewater pipe from Los Angeles County.(Image:Los Angeles County Public Works Department)
Californians have been doing an exceptional job reducing their indoor water use, helping the
state survive the most recent drought when water districts were required to meet
conservation targets. With more droughts inevitable, Californians are likely to face even
greater calls to save water in the future.
However, less water used in the home for showers, clothes washing and toilet flushing
means less water flowing out and pushing waste through the sewers. That has resulted in
corroded wastewater pipes and damaged equipment, and left sewage stagnating and
6
neighborhoods stinking. Less wastewater, and thus more concentrated waste, also means
higher costs to treat the sewage and less recycled water for such things as irrigating parks,
replenishing groundwater or discharging treated flows to rivers to keep them vibrant for fish
and wildlife.
It's a complex problem with no easy answers. Some water agencies even have suggested
the state needs to push more conservation efforts to outdoor water use rather than indoor
use to keep wastewater flowing. For now, local sanitation agencies are beginning to assess
how best to respond with changes in how they operate — and how they plan for a future that
will inevitably include more droughts.
"Indoor water savings are good, but the flip side is, as you get lower [use] ... at what point are
you causing more harm than the benefit you are getting from saving those drops of water?"
said Adam Link, director of operations with the California Association of Sanitation Agencies
dam Link, director of operations with the California Association of Sanitation Agencies (Image
California Association of Sanitation Agencies)
Link said his organization had heard anecdotal accounts of problems, but that they varied
depending on location. Wastewater agencies generally handled problems through operational
changes such as increased chemical treatment.
A recent report by the Public Policy Institute of California (PPIC) quantified the problem,
finding in a survey of wastewater agencies, that one-fifth of respondents indicated increased
corrosion of collection systems due to declining influent quality.
The PPIC's report released in April, Managing Wastewater in a Changing Climate, said the
wastewater treatment sector "is at a turning point," with drought posing the biggest challenge.
The report suggested action is needed to improve coordination between water suppliers and
wastewater agencies to ensure that water conservation efforts in the urban sector can be
accounted for as part of the short- and long-term planning on the treatment side
"Wastewater managers would benefit from knowing which demand management strategies
are deployed, when and where the strategies are being implemented, and how much indoor
7
water savings are expected over time," according to the report. It noted that the California
Department of Water Resources and the State Water Resources Control Board could help
facilitate better exchange of information and provide guidance for integrating water supply
and wastewater planning.
"Indoor water savings are good,but the flip side is, as you get lower [use] ... at what point are
you causing more harm than the benefit you are getting from saving those drops of water?"
Adam Link, director of operations with the California Association of Sanitation Agencies
Link agreed that as wastewater agencies plan for future treatment capacity and the projected
demand for recycled water, they should be included in discussions about further reductions in
water use — and how reduced flows affect the planning and sizing of recycled water projects.
The state has set a goal of developing at least 2.5 million acre-feet a year of recycled water
by 2030.
Rob Thompson, assistant general manager of the Orange County Sanitation District, said his
agency has planned for changing flow patterns based on factors such as economic activity
and the amount of rain received.
"When people talk about low flow, it's really one of a plethora of items which are really about
resilience," he said. "We are consistently planning ... with our operations, maintenance and
engineering to deal with those changes."
8
_C Q Wastewater travels from your home or business
C C through local sewers and regional interceptors
Q to our treatment plant near Elk Grove.There,we
C clean it and safely release it back to the river.
�1
I1.4fi''AM -
L
SEWER COLLECTION
411111 SACRAMENTO REGIONAL COUNTY
11h- SANITATION DISTRICT
RECYCLED WATER
FUTURE ADVANCED WASTEWATER
TREATMENT PLANT
This
schematic from Sacramento Regional County Sanitation District is an example of how wastewater systems work. (Image:
Sacramento Regional County Sanitation District)
The district receives about 185 million gallons of sewage each day from more than 2 million
people in north central Orange County (185 million gallons would fill a football field 515 feet
deep). One hundred million gallons of that treated wastewater is put back to work to irrigate
parks, schools and golf courses and help combat seawater intrusion.
The district's collection system and manholes have been protected from corrosion since the
1960s and for the last decade, chemical treatment has been used to block formation of
odorous and corrosion-causing compounds, said Thompson, noting that the district has been
granted patents for its processes.
9
Re-evaluating Water Conservation Strategies
The 2012-2016 drought was the driest in recorded state history. The extent of the impacts
from reduced sewage flows — corrosion, odor problems as sewage pools in neighborhood
pipes and increased salinity — surprised some people. The episode highlights what's needed
in the future.
"We know the next drought is coming. This is our reality to manage and adapt to," said Jelena
Hartman, senior scientist with the State Water Board, at PPIC's April panel presentation on
the report.
"California policy on long-term water use efficiency should prioritize outdoor water use
restrictions, which will have a lower impact on interconnected water systems, to achieve
statewide demand management goals."
2017California Urban Water Agencies white paper,Adapting to-Change: Utility Systems
and Declining Flo-vs
Because many rivers rely on treated wastewater for water quality and flow, reductions in
discharges can add to the environmental impacts on rivers when drought strikes, Hartman
said. Less water flowing to rivers — whether from treatment plants, street runoff or
stormwater flows — affects overall environmental quality.
"It's not just water recycling," she said. "We are talking about low-impact development,
capturing storm flows and reducing urban runoff."
Meanwhile, the drive to ratchet down water use in California begs the question of whether
conservation efforts could eventually shift because of the impacts to the wastewater sector. A
2018 law sets indoor consumption goals at 55 gallons per person per day, with the figure
dropping to 52.5 gallons in 2025 and 50 gallons in 2030. It's up to water agencies to work
with users to meet the goals.
In a 2017 white paper, Adapting to Change: Utility Systems and Declining Flows, California
Urban Water Agencies (CUWA) noted that while saving water indoors is an important
element of water management programs, more must be done to manage all future water
demands. CUWA is an association of 11 major California urban water agencies.
"California policy on long-term water use efficiency should prioritize outdoor water use
restrictions, which will have a lower impact on interconnected water systems, to achieve
statewide demand management goals," the white paper said.
10
Outdoor water use varies greatly in the state, accounting for as little as 25 percent of a
household's use in coastal areas and as much as 80 percent in the hotter inland regions.
Treated wastewater flows into the Los Angeles River.These types of wastewater discharges are
important sources of water to help maintain river vitality. (Image: Southern California Coastal Water
Research Project)
On the environmental side, work is underway to quantify the impact of reduced discharges to
surface waters. In Los Angeles, a coalition of state and local agencies are collaborating with
the Southern California Coastal Water Research Project on a two-year study launched last
fall to determine what happens when treated wastewater effluent and runoff usually sent to
the Los Angeles River is diverted for recycling.
Researchers are looking at how vulnerable species and habitats along a 45-mile stretch of
the lower reach of the river respond to flow reductions with an eye toward developing
recommended flow targets by season and section of the river
What's Next
When drought returns to California and people do their part to conserve water, use levels will
again drop, perhaps even to record-low levels. Wastewater treatment agencies will again be
faced with even less flows. Thompson, with the Orange County Sanitation District, said
agencies should use their regular retrofit and upgrade schedule to measure their resilience
11
r
z
Part of a wastewater treatment plant in Contra Costa County. (Image: File)
"You don't design for one little problem," he said. "You look at the overall condition of your
treatment plant and look at opportunities to replace outdated infrastructure with more focused
infrastructure that meets the new needs you are facing."
The state, PPIC said, should help the wastewater sector and direct its funding assistance
toward regional approaches to planning and research.
"The state also has a responsibility to evaluate its own policies for areas of conflict between
water use efficiency, recycled water production and environmental flows," the report said.
"The state needs to be clear about the inevitable tradeoffs associated with these goals and
help set priorities."
There also needs to be better delineation between what's happening with the long-term trend
of reduced indoor water use and the impact drought has on that use.
"That is one of the unanswered questions," Link said. "Is there going to be a bounce back [in
water use after a drought] or is there where we are and what we have to plan for?"
12
OC Register
June 26, 2019
-- ORANGE COI-INTY
HEAL THE BAY REPORT CARD
LOCAL BEACHES GET HIGH MARKS
Good news:
Orange County beats statewide rate for A and B grades, while 10 locations
make group's honor roll
Bad news:
Far fewer receive top scores on wet winter days, and two are among 10
worst `Beach Bummers'
By Martin Wisckol >> mwisckol(aD-scng.com >> @MartinWisckol on Twitter
The good news is that 97% of Orange County beaches scored an A or a B for summer
water quality in Heal the Bay's 2018-2019 Beaches Report Card to be released today,
higher than the statewide A and B rate of 94%. Of the 33 California beaches making the
environmental group's honor roll with perfect grades, 10 were in Orange County.
The bad news is that the 17 inches of rain this winter — nearly twice the historical average
— resulted in just 56% of county beaches receiving top grades on wet winter days.
Statewide, just 54% of all beaches received an A or a B during wet weather.
Additionally, two Orange County beaches were among the 10 worst "Beach Bummers" in
the state. Also, four county beaches that last year made the group's honor roll fell off the
2019 list.
"Rain washes pollutants and contaminants into the ocean thus lowering water quality," says
the report, which used water quality data from county health agencies.
I _�
"Beachgoers who recreate at beaches after a rain event have an increased risk of contracting ear
infections, eye infections, upper respiratory infections, skin rashes and gastrointestinal illness.
"Approximately 1 million ocean beachgoers contract illnesses each year in Los Angeles and Orange
counties, with total healthcare costs of$20 [billion] to $50 billion."
Contributing to the region's dirty water over the past year were 28 sewage spills in Orange County,
96 in Los Angeles County and November's Woolsey fire in the Malibu area.
Heal the Bay recommends avoiding the water at beaches with a C grade or below and staying out of
the ocean at all beaches for three days after it rains. The Santa Monica based group's Now Cast app
and Now Cast online site predicts daily water quality at more than 20 beaches.
Climate change
With scientific assessments that climate change is leading to more extreme periods of rainfall, and
more extreme wildfires, the report notes a domino effect resulting in dirtier ocean water.
"Major wildfires ... can have a big impact on water quality because fires damage sewage
infrastructure and increase the amount of runoff due to vegetation loss,"the report says.
After the Woolsey fire during a seasonal period Heal the Bay defines as "dry winter" only
57% of the Malibu beaches received grades higher than C. That was a marked change from the
previous five years, when the 87% of those beaches received an A or B during dry winter months.
"Governments, leaders and the public must take immediate action to mitigate the effects of climate
change and pollution,"the report says. "Many local governments have made enormous efforts to
identify and eliminate runoff entering the ocean, but across the board there are still improvements to
be made."
The report notes steps that have been taken at specific locations to improve water quality. On a
larger scale, more than two thirds of Los Angeles County voters last year approved Measure W,
which will result in $300 million in new annual parcel taxes to be used to capture storm runoff and
reduce pollutants entering the ocean.
Beach Bummers
The report defines three types of beaches and how they differ in water quality. Open beaches without
obstructions or urban runoff tend to get the best scores in both wet and dry weather. Meanwhile,
those that have stream, river and storm drains flowing into the ocean tend to score poorly. So do
enclosed beaches, which include those found at marinas, harbors and lagoons.
Topping the report's 10 Beach Bummers statewide is the San Clemente Pier, which is affected by
runoff during rains and dry periods because of a nearby storm drain. Another problem for San
Clemente Pier one that's common for many piers is birds congregating and defecating into the
ocean.
14
The study noted steps the city has taken to try tackle the problem, including installing bird netting
under the pier. Additionally, a city Ocean Water Quality Subcommittee was formed in April and the
city is conducting a tracking study to help identify sources of bacteria in the water.
Also on the Beach Bummers list is Monarch Beach at Salt Creek, near Dana Point's five-star Ritz-
Carlton resort. The beach is also affected by dry weather storm pipe runoff. The city has installed a
facility to treat water flowing from Salt Creek and has implemented a bird abatement program,
according to the report.
Honor roll
Orange County led the state last year with 14 beaches on the honor roll, meaning they received
perfect scores year-round. The count fell to 10 beaches in this year's report and was surpassed by
San Diego County's 12 beaches with perfect scores.
The total number of honor roll beaches statewide dropped to 33 from 37 last year. Los Angeles went
from having eight on the list to two.
Orange County's 20182019 honor roll beaches are:
• San Clemente: Avenida Pico, Avenida Calafia and Linda Lane Beach.
• Dana Point: Dana Strands Beach, Dana Point Harbor Youth Dock and-South Capistrano Bay
Community Beach.
• Laguna Beach: Victoria Beach and El Moro Beach.
• Huntington Harbour in Huntington Beach: Trinidad Lane Beach and Coral Cay Beach.
I�
FOCRegister
19
GRANGE COUNTY
D VE21
r
ENVIRONMENT
Seal Beach prepares for flooding
Extreme scenario deemed possible because of a rising sea level
By Martin Wisckol
mwisckol(cD-scng.com @MartinWisckol on Twitter
Seal Beach residents got a look Wednesday at what sea level rise could mean to them,
thanks to a city presentation showing that large swaths of the small municipality could flood
by 2050 and that the odds of even greater inundation will increase throughout the century.
Though there was significant concern among the 40 or so residents on hand at the Marina
Community Center, there was also criticism that projections of sea level rise showed
flooding far sooner than was probable.
The state's sea level projections used at Wednesday's workshop have just a 0.5% chance
of occurring as quickly as the city is expected to prepare for. State officials say those
projections are recommended to accommodate factors not taken into account in the
calculations, including indi-cations that water rise may accelerate faster than previously
thought.
"I think that's a bit aggressive," said Robert Goldberg, whose Clipper Way home is in an
area projections show will be among the first to flood. "I'm not going to sell my house based
on a 1-in-200 chance. I think something like 1% or 2% might be more appropriate."
The workshop is part of the city process in developing its Local Coastal Plan, which will
outline development and resource protection rules in Seal Beach's coastal zone. The
document will incorporate requirements of the state Coastal Act and allow the city to give
final approval to new development. Because it lacks a Local Coastal Plan, the city currently
must send new coastal development to the state Coastal Commission for review.
16
One component of the Local Coastal Plan will be how the city intends to adapt to rising
seas. A preliminary report outlines a possible mix of protections such as seawalls and sand
berms, accommodations such as putting buildings on stilts, and retreat, which could include
abandoning and demolishing current structures.
The probability debate
Seal Beach is already susceptible to flooding, with a sand berm constructed on the beach
each winter as protection against high tides and big surf.
According to recommended state projections, a 1.6-foot sea level rise could occur by 2050.
Combined with a 100-year storm and without new mitigation, flooding from the San Gabriel
River northwest of the city and Anaheim Bay to the southeast would spill over into
neighborhoods inland from the beach — particularly low-lying areas south of Pacific Coast
Highway.
With a 3.3-foot sea level rise by 2070, similar flooding would occur without a storm. With a
6.6-foot seal level rise by 2100 and no storm, the inundated area would roughly double,
with water coming from the ocean and nearby wetlands as well as from the San Gabriel
River and Anaheim Bay.
But those projections have just a 0.5% chance of occurring, according to the Coastal
Commission. The "likely" scenario outlined in the city's Sea Level Vulnerability Report is a
half foot to a foot of sea level rise by 2050 and 1.3 feet to 3.2 feet by 2100.
The projections of faster sea level rise were developed by the state Ocean Protection
Council and are used as recommendations by the state Coastal Commission, which must
approve Local Coastal Plans.
"We want to make sure we're not underestimating future sea level rise because the
consequence to coastal resources, development, life and safety could be severe," said
commission spokeswoman Noaki Schwartz.
She said that the science of projecting sea level rise has continued to evolve since the
state projections were established, including indications that ice sheet melt may cause
seas to rise faster than previously thought. That means the 0.5% probability "may, in
reality, be higher," she said.
A harbinger
Anticipation of future sea level rise already id affecting development plans in Seal Beach.
A proposal to build two houses on a vacant lot on 17th Street, five blocks from the beach
and four blocks from Anaheim Bay, has been staunchly opposed by Coastal Commission
staffers, which note that 3.3 feet of sea level rise would inundate the lot.
"The proposed subdivision and construction of two single-family residences is not designed
or engineered for the changing water levels and associated impacts that are anticipated
over the life of the development," says the staff report. "It is important to note that at 5.7
17
feet of (sea level rise), inland flooding is so severe that the beach fronting portion of Old
Town may become an island and that whole sections of sandy beach may disappear."
At the request of the builder, a commission vote on the project scheduled for July 10 was
postponed.
That situation is likely a harbinger for all coastal cities as they develop statemandated
climate adaptation plans and update their Local Coastal Plans.
"What we're after is what adaptations are most appropriate for Seal Beach," city consultant
Chris Johnson told the workshop gathering Wednesday. "The most appropriate fix."
"We want to make sure we're not underestimating future sea level rise because the
consequence to coastal resources, development, life and safety could be severe"
Noaki Schwart, Coastal Commission spokeswoman
18
Looking for the Light.com
July 31, 2019
Looking For The Li�Aht.com
Wouldyou drink desalinated
seawater? Recycled sewage water? Get
ready to find out
IDEAS.TED.COM
,lul 31, 2019 /Amanda Little
,,,to;
�� 1r
19
Our planet is getting hotter and drier. Drinking water is in short
supply, but there are two largely untapped sources: the ocean
and sewage. To get a taste of what might be in store for our
faucets and understand the pros and cons,journalist Amanda
Little goes to California.
The summer of 2019 has seen heat records tumble like dominoes across the _northern 11emisphere. On
May 26, the thermometer climbed to 102 in Savannah, Georgia, an all-time high for that month; the
same day, it hit can unprecedented 103.1 in Ilokkaido, Japan 's northernmost island. Then, in June, a
three-week heat wave tore through Pakistan and India, where it reached 1123.4 in the central city of
Churu. In July, it was Western Europe 's turn when the temperature soared to 108.7 in Paris and 10".2
in Brussels
Of course, intense heat doesn't occur in a vacuum. It's accompanied by water shortages and drought,
which are expected to be the new norm on our planet. In the L,S, droug has become associated with
California. In fact,from December 20, 2011, through _Vlarch 5, 2019, some form of drought existed
somewhere in the state. T his prolonged parching has resulted in billions of dollars in agricultural
losses and the death of over 100 million trees in state forests alone.
Below,journalist Amanda Little goes to Southern California to learn more about N)o sources of
drinking water which the state and our planet will be tapping in coming years.
:almost all of the water consumed by the 22 million people of California's 'cater-stressed
southern region is imported. Much of it is pumped long distances, over mountains, from Northern
California. Southern California also draws heavily from the Colorado River, the beleaguered waterway
that supplies six other states and Mexico. As these freshwater sources have dwindled, the cost of water
imported to Southern Californian cities has been climbing nearly 10 percent a year. The changing
economics of water have forced utilities to turn in a new direction for relief: westward to the Pacific
Ocean.
California has 840 miles of coastline adjoining the world's largest ocean, an oversupply of brine
lapping up against an increasingly thirsty landscape. In order to tap this massive reservoir, the San
Diego Water Authority partnered with the Israeli company IDE to build a $1 billion desalination plant
in Carlsbad, a suburb of San Diego. It opened in 2017,the largest desalination facility_ in the Western
Hemisphere.
"If we could ever competitively, at a cheap rate, get freshwater from salt water, that ... would really
dwarf any other scientific accomplishments," President John F. Kennedy told the Washington press
corps in the 1960s.
Mark Lambert, the head of IDE's U.S. division, who oversaw the building of the Carlsbad plant,
describes desalination as "the most significant kind of modern alchemy. About 97 percent of the
earth's water is in the ocean, yet only recently have we been able to tap that resource to grow crops or
quench human thirst."
20
"Desalination may seem like a panacea, but from a cost and energy- standpoint it's the worst deal out
there," says Sara <lminzadch of the California Coastkeeper Alliance.
Desalination has been around for millennia if you count the evaporation techniques pioneered by
the ancient Greek. Sailors in the 4th century BC boiled salt water and then captured the steam. �N hen
cooled, steam condenses into distilled water that's free of virtually all contaminants. This same basic
technology- thermal desalination is still used in places like Saudi Arabia, where fuel for boiling
the water comes cheap. Since the 1960s, most desalination operations use reverse osmosis (RO), a
method that simulates the biological process that happens within our cells as fluids flow across
semipermeable membranes.
There remain big challenges for desalination, and number one is the energy- cost. A NASCAR
vehicle does about 700 horsepower at full throttle. By contrast, the series of pumps at the Sorek plant
near Tel Aviv--the world's largest desalination facility, which processes some 200 million gallons
daily collectively exert roughly 7000 horsepower of energy- (or 1100 pounds per square inch of
pressure) night and day.
Improvements in the pumps, pipe design and membranes have cut the total amount of energy used in
desalination by about half in the past two decades. The energy- demands will come down further as
efficiencies improve, but mane see it as a sticking point.
Sara Aminzadeh, the executive director of the California Coastkeeper Alliance, one of many
environmental groups that have opposed the development of desalination plants in California, tells me,
"Desalination may seem like a panacea, but from a cost and energy standpoint it's the worst deal out
there."
The Carlsbad desalination plant provides nearly 1/10th of San Diego County's total eater supply
—enough for about 400,000 county- residents. Up the coast, another large desalination plant is under
construction in Huntington Beach, which will supply drinking water to LA suburbs. More than a dozen
similar plants have been proposed along California's southern and northern coastlines-
Daily, the Orange County plant pumps out 100 million gallons of drinking water. The sewage moves
through.eight stages of filtration before it is drinkable.
But there's another source that's becoming even more critical to the future water supply, one
that officials call "recycled wastewater," a pleasant term for human sewage. This is one of the
harder realities I've come to accept about modern agriculture that everything we're now flushing
down our toilets and pouring down our drains may have to play an important role in feeding us and
growing our food.
"We call it the big tooth comb step one of the filtration process!" Snehal Desai, Global Business
Director of Dow Water & Process Solutions, shouts above the sound of sluicing water. There's a
visible torrent of raw sewage water flowing through a channel below us at the Orange Clounty
Sanitation District, a facility that treats waste from the toilets, showers, sinks and gutters of 1.5 million
suburban Californians. An enormous rake descends into the depths of the sewage flow and brings up
cardboard, wet wipes, tampons, eggshells, marbles, toys, tennis balls, sneakers all the detritus that
can't fit through the screen covering the plant's intake.
21
The flow that passes through the screen has begun a'ourney through an advanced purification process
that culminates in a stage of RO filtration. Daily, the plant pumps out 100 million gallons of drinking
water—enough to supply 850,000 county residents which makes this the largest"toilet-to-tap"
facility on the planet. The sewage moves through eight stages of filtration, including a grak-el-sand
filter and a bacterial "bioscrubbing" process used in Israeli plants. Orange County also has a
.'microfiltration" stage, in which the water is sucked through thousands of tiny porous straws. In the
final and most critical stage, the water is forced through a massive hire of cylinders containing the RO
membranes.
This Orange County- facility- is setting a precedent for the use of sewage to produce drinking
water every bit as pure as the water that comes from desalination. This process is cheap compared
to desalination about half the cost. Sewage has much lower salinity than seawater, which makes it
easier to process. "Recycled wastewater is the fastest-growing area in the water industry. Why?
Because not every city has an ocean, not everyone has good lakes and rivers, but every bodv's got
sewage," says Desai. '`That's the megatrend."
"Accepting recycled wastewater is kind of like being asked to wear Hitler's sweater," saes social
psychologist Paul Rozin.
San Diego recently announced plans to produce 35 percent of its water from recycled sewage by
2030 — not just for irrigation but for drinking. It has completed designs on a toilet-to-tap facility
larger than Orange County's. Still, there are barriers to overcome, and the gross factor is first among
them. Even the desperation of drought can't eliminate the fact that drinking your own waste is
nobody's first choice, unless you're a resident of the international space station.
"Accepting recycled wastewater is kind of like being asked to wear Hitler's sweater," says Paul Rozin,
a social psychologist at the University of Pennsylvania who has consulted water utilities on marketing
toilet-to-tap programs to residents. "No matter how many times you clean the sweater, you just can't
take the Hitler out of it."
But the purity you get from the RO process is quantifiably better than the eater you get from
conventional treatments —better even than some bottled water. "What flows from our membranes
is the Rolls-Royce of municipal water," says Desai. Whereas tap water is often treated with chemical
coagulants and chlorine, RO filtration is a mechanical filtration of water contaminants that cuts the
need for those chemicals. It's analogous to the mechanical removal of weeds in a field practiced by
organic farmers in lieu of chemical pesticides: "Think of it as `organic' tap water," says Desai.
For now, Dow is focused on making membrane products for big industrial and municipal water
s-ystems, but it envisions micro-scale systems down the line. Bill Gates made a pitch for a similar
approach when he blogged a few years back about watching a pile of human feces on a conveyor belt
enter a small-scale waste-treatment plant built to serve a community of a few thousand people in
Senegal, and, in minutes, get converted into "water as good as any I've had out of a bottle. I would
happily drink it every day."
Desai predicts that water filtration technology will become decentralized everyvvhere. We'll
control and regenerate our own water supplies farm by farm, neighborhood by neighborhood, or
household by household. Eventually the water production could become, like the food production,
circular a closed-loop system in which 100 percent of water that goes down commercial and
22
residential drains is recycled; whatever is lost in evaporation or leakage can be made up for with
desalinated salt water that moves through shared networks. Although the vision is at least decades from
becoming a reality, it may be necessaiy to our future food security and critical to our survival.
At the end of my- tour of the Orange County- plants, we arrive at a shining stainless-steel sink
where water that hours earlier had begun as raw se«age «as now flowing erystal clear from the
tap. Desai filled up two Dixie cups. "To the future!" he toasted. I shuddered as I knocked mine back.
But somehow, the stuff tasted every bit as good as water that had bubbled up from a sprung in the Alps.
I poured myself a second cup.
Excerpted with permission from the new book The Fate of Food: What We'll Eat in a Bigger, Hotter,
Smarter World by Amanda Little. Published by Harmony Boobs, an imprint of the Crown Publishing
Group, a division of Penguin Random House LLC. Copyright 0 2019 Amanda Little
Watch her TEDxNashville talk now
ABOUT THE AUTHOR
Amanda Little is a professor of journalism and writer-in-residence at Vanderbilt Iiniversity. Her
reporting on energy, technology and the environment has taken her to ultra-deep oil rigs, down
manholes, and inside monsoon clouds. Little's work has appeared in publications ranging from The
New York Times and The Washington Post to Wired, Rolling Stone and Bloomberg Businessweek.
She is also the author of the book Power Trip: From Oil Wells to Solar Cells Our Ride to the
Renewable Future.
23
Michelle Steel
August 5, 2019
SUP ERV O .
STEEF
MICHELLE
r i / ,
UPDATES
August 5, 2019 Volume 5 Issue 11
Orange County Sanitation District's Centrifuge Facility Ribbon Cutting Ceremony
I had the honor of giving the welcoming and introductory remarks for the Orange County Sanitation District's Centrifuge
Facility Ribbon Cutting Ceremony, as well as the District's 65th Anniversary.
The new facility brings online some of the largest centrifuges in the world used in wastewater treatment, and implements
technology that reduces the volume of biosolids produced. This will not only save the District approximately$4 million per
year, it also reduces their environmental footprint.
After the Ribbon Cutting and tour of the new facility, I greeted OCSD staff and constituents at their 65th Anniversary Open
House.
Congratulations Orange County Sanitation District on both major milestones! Your staff did a great job at both events and
were great hosts!
24
II p���
Twitter Posts
July/August 2019
Jul 2019.31 days
TWEET KONLIOW2 .M 2010 SUMMARY
Top Tweet earned 2,439 impressions Top mention earned 143 engagements T.veet n,,e t,mp—s,—
Pee.poo and paper.Yes,we said it,the P t# City of Anaheim 12 12.3K
words.The only three things that should go a@City_of Anahelm jt,j io
PtpA a Maenorte
down the pipe. Do you know what doesn't #Traffic alert:Overnight sewer work by 276�•tb 23
start with a P?Flushable wipes. I hope you c7 OCSewers continues this morning
know what that means. through early aftemoon, impacting
`den btiY�p
intersection of Ball and State College.No
#NoWtpipTuesday ePipes#What2Flush left turns.Please take altemate routes. 5
#ToiletTipTues
pic.twitter-com17r4ohrGouq Intermittent work at this intersection will
continue for the next several weeks
pic.twitter.com/GPKY8LsfBB
J
��� • • Tf 1. "In -
View Tweet activity I VieW all Tweet altivity
az V44 at
View Tweet
Top Follower 1,562 people
Q -
Top media Tweet earned 623 impressions
Clear skies and blue water what more could
you ask for?The Ocean Monitoring group
goes out about 100 days a year to collect
T®vora samples and test for water quality,ocean
@tevora FOLLowsYou sediments,and fish tissue.
Tevora is a risk and compliance management consulting #OCSDatWork#OC SD
firm that specializes in information security,governance,
and compliance. #ProtectingTheOcean
pic.hvitter.com/2jUhxBs1zy
View profile View followers dashboard �■�
26
28 day summary rvth cgange,oax,previws penca
15 c.,;: 12.4Kt•146% 219 y3.5% 31 t1t6VK 1,592 t1s
CM 479 1
Aug 2019•22 days so far..
TOP Tweet eamsd 1,542 imp:mssions Top mention earned 2Ci engagercents Get your Tweets in front of
Thank you @LVMWD for coming and faking John Wayne Airport more people
a tour of our Plant No.1 facility in @UohnVtiyrri!T FLg 2 ;=romaeed Tweets am oontant oiler.up your
#FountainValley!We hope you enjoyed please be advised that southbound rack or.T%%iter to more people.
your time! MacArthur Blvd.will be impacted due to
#OCSD#What2Flush#TourTime construction f� activity performed by
@-OCSewers beginning this evening at 8
pic.h'ritier.camlbEOeVRIJvX9 p.m.and continuing through Aug.8 at 8 p.m. "i3sccas:erruo
JWA encourages guests to plan ahead to .. 1AttI OrVKW%
avoid delays.#FlyJWA 11 9,470
pic.t'vitlercomM(NF6MloH3f
— --_r.-_ its ;,lanuon
• 151 20
• �tI�
• 12
View Tweet activity '.Few 311 Tymet xt7oir
Top Follower fcllowedby5TAKp-sople Mew Tweet
Top media Tweet earned 433--mpmssions
r_ 9 OCSD is looking for a Principal Safely&
-� Health Rep!You will coordinate and oversee
CBSLA Assignment Desk - activities in support of our safety and
@KCRSKA- esk =ate,— emergency response needs.Interested?
The Assigrmer,Desk al KCiMEXCAL Visit ocsd.comlabout-usFtobs to find out
more.pic.twiHer.com)5vwl1KMt8f
•,Iew profile 'fell fol:cwr=,s dasnboard
6 /
Q •7
View Tweet activity Metv all Tweet actrvny
27
Facebook Posts
July/August 2019
Page Summa4 Last 28 days e Export Data
Results from Jul 26,2019-Aug 22,2019
Note:does not include today's data Insights activity is reported in the Pacific time zone.Ads activity is reported in the Organic Paid
time zone of your ad account.
Actions on Page i Page Views I Page Previews
July 26-August 22 July 26-August 22 July 26-August 72
698 35
y**� Total Page Views a6% Page Previews&6%
We have insufficient data to show for the
selected time period
Page Likes I Post Reach Story Reach r
July 26-August 22 July 26-August 22 July 26-August 22
19 2,753 Get Story Insights
See stall on how your Page's storl is
Page Likes a 12% People Reached v 34% performing.
Recommendations r Post Engagements Videos
July 26-August 22 July 26-August 22 July 26-August 22
,Ala 2,451 851
iN N■ Post Engagement a 62% 3-Second Video Yews♦37%
2410■
We have insufficient data to show for the
selected time period
Page Followers I Orders
July 26-August 22 July 26-August 22
21 0
Page Followers a 24% Number of Orders&0%
Earnings from Orders A 0%
28
All Hosts Hublished
Reach:Organic f Paid I Post Clicks Reactions,Comments
Published Post Type Targeting Reach Engagement
08122f2019 � Today. OCSD staff aflended the 29
2:40 Pht Califorria Association of Sanitation 195 12
08,2212019 Thank you Beth Hammon and Kate A 15
9 DOAht Alegria from Rep. Harley Rouda ` 196 10
08119F2019 ® Happy Monday!Help us r- 453
1:00 Pht congratulate Jennifer Cabral on her q l 357
08i1912019 At OCSD are are dedicated to I.. ,� 267 1s
12:00 PM protecting the environment and 1 � v 1S i
0 811 612 01 9 Sewer installation continues on State — A 3
9:DD Aht I College Blvd_in the City of Anaheim- 331 4 1
ow15MO.19 r Thank you California State 59
1t:A5AM � University. Fullerton for coming and h-' * aJS 36 �
08AV2019 ' Reminder,tomorrove night is the -, 5
7-43 AM second public scoping meeting for 10i1 5 I
08112f2019 OCSD is currently seeking a r 123
11:ad AM maintenanr_e worker that has a u I 44 ,
08109/2019 Ever yonder what our Huntington `,r — 20
11:10 AM Beach facility looks like?What goes 575 — 20
08199f2019 'Pile are proud of our past in Orange �� �05 12
9=00 AM County.Take a look at this invitation 1£ )I
t181a3I2019 We want to hear from you_We have 299 - 11
12:00 P4v1 two public scoping meetings for our - \ 6
08ia8f2a19 �' August is#waterqualitymonth,and 15
9 DC AM we'll be sharing water quality facts 25+ 16
0&0772a19 Happy Professional Engineers Day! 287 30
rm +P{ithout you OCSD wouldn't be 27
08105I2019 OCSD is looking for a Principal 34�ry 31
3:01 PM Safety&Health Rep!`tau will \ 37 �
=02P2019 The winners have been chosen!A 15 l
6 HUGE thank you to everyone who � 193 5 �
0810112019 Thank you Las Virgenes Municipal _'99 32
1:15 PM Water District for coning and taking 26 �
29
0713012.019 Centrifuge Ribbon Cutting Ceremony 92
1:u2 Phi 237 7
075012019 Thank you Director Andrew Nguyen M4 156 11 1
It 14 A)A from Midway City Sanitary District for 3
0713012019 Sometimes people lie.we would \� 756 49
1-4-00 AM never lie to you.Believe us when we 45
07)2912019 ■ Celebrating B5 years of impressions. not \ 36
-"'+ OCS6 aims to not just make a good 1119 18 0
07129/2019 Construction Alert in City of , ,� 12
3:00AW Anaheim-Municipal Government. � _S3 6
07127120119 Us rushing to OCSD for the Open ■4 193 14
t0-00 AM Pq House happening TODAY!Come 13
07)2612019 When we weren 1 listening to the �- � 81 �
4:00 PMSpice Girls in the 907s,we were busy \ 47E 48
07I2&2019 Vle thought this might be helpful. ■* \ 355 4 26
1 37 Phl Just in case you weren't 100%sure 18
0712512019 The 311's were about more than just _ — 23
4:45 Phi spandex and leg warmers.At OCSID I' 259 19
0712412019 Tonight at Plant No. 1 our Steering 9 i
4 55 PM Committee and Board meeting will t i 3
0712412ff19 As we moved into the 70`s vie were -- 30
3:10 Phi busy constructing_The new 5-mile Fri 315 24
07t23121)19 In the 60's the Sanitation Distract \� 544 41
7 16 Phr continued to expand-Witli the short 31
07123F2019 Are you as excited as we are about 17
the Open Mouse this Saturday? 313 14 i
07122/2019 As we get ready to celebrate our - 103 �
4:01 Phi anniversary let's go down memory \ 1.1 K 74 �
0711912019 Us inviting our friends to come visit g T
1:03 Phi us at our Open House on Saturday, 237 6
07,11912019 �' Did you know that in 2016 The \
12:00 PM Governor of California signed 201
07117r2019 Disneyland:64. OCSD_65. Basically � - 10 1
i
7:07 PMfivinsa Which means we m 7ust be -"-
071l712019 ■ Happy national Sanitation'Aforkers 354 40
3:23 Phi Day! We work with a purpose.
30
07116120/9 Treating wastevlater,as easy as VN 34_ 41
11:21,8-M 1.2.3.#bottlecapchallenge 16
07N2r2019 Number 83 on our bucket list: 454 56
9:00 AM skateboarding inside a nevily built 51
07i10I?019 ® Thank you City of Anaheim- 4� 228 t5 1
10:24 AM Municipal Government for helping us
07d10�2019 Traffic delays at Slate College and Ly 1v6
7_34 AM Ball Rd in City of Anaheim- -
07+09 2019 Join us for OCSa's Operations 5
4:15 PM Committee meeting on Wednesday � � t?0 1 I
07.0912019 ® Construction Alert for City of -1 0147
12:00 PM Anaheim-Municipal Government at 2
07.*912019 Pee.poo and paper Yes,we said it, 45 �
O.GG AM �► the P yards.The only three things 76,8 49
07'03i2019 Do you like to visit the beach?If so, r� 4� 333 23
1 t:40.khl you'll be glad to hear that Heal the 32 4
07105120/9 Happy#FlashbackFridayl This photo t� 25
12:00 PM � is from the 19130's and shay -rggs then =5
07105i2019 OCS.Us Legislative as Public Affairs t
15S
HOAM Committee meeting is next Monday. lip 4 1
07a'0412019 ® Happy 4th of July!Wishing everyone # 216 5
11:11 AM a safe and fun holiday with family 15
07i0212019 Clear skies and blue water,what � 342 22
12:00 PM more could you ask for?The Ocean 31 �
07,GV2019 Congratulations to Us!We have a71
once again been recognized for our
i1
Instagram Posts
July/August 2019
ocsewers Edit Profile l_!
229 posts 593 followers 65 following
OC Sanitation District
The OC Sanitation District provides wastewater collection,treatment,and recycling for
approx 2.6 million people in central&north Orange County.
www.ocsd.com
9 POSTS 16T`J SAVED 1 TAGGED
All J
r.
LAMM
s fa 7 Y"IT, i:1 L
O I O
0
1
'�►. .
l
12
'zik
\� r
. O
• • ( .
r
i
XIAT&COUK00 A►Atl%*A6
MAJOR NIGNTWORK
T-dwy My.
You can't rl" I If;,�
sit with us
lap
4'rif
9/9/2019
Open House and
Ribbon Cutting
&,JS, ■ � �■ BY: Jennifer Cabral
Administration Manager
Eli
Sam&®
ei _ A�
imamwo ,pa
65t" Anniversary Open House
FP
• 500 people attended v
• 18 Division Booths
170 employees volunteered `
• 6 Outside Agencies
• 224 people took a Tour Participated
100 bags of # a
i compost given +
out c ,1
2
1
9/9/2019
Ribbon Cutting of New Centrifuge
• We had 50 attendees at the
event
Received certificates and _
resolutions from: _ t
• Congressman Cisneros •_
• Congressman Lowenthal ff
• Congressman Rouda
• Assemblyman Choi -
• Assemblyman Chen
• Assemblywoman Petrie-Norris
• Senator Umberg
• Supervisor Steel
• Supervisor Chaffee _
II' _
+T L
'+: M
,Iw J
�Illlllo"
3
2
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
LEGISLATIVE AND PUBLIC AFFAIRS (714)5937433
COMMITTEE
9oTFCTN0 THE
Agenda Report
File #: 2019-608 Agenda Date: 9/25/2019 Agenda Item No: 15.
FROM: James D. Herberg, General Manager
SUBJECT:
LEGISLATIVE AFFAIRS UPDATE FOR THE MONTHS OF JULY AND AUGUST 2019
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file the Legislative Affairs Update for the months of July and August 2019.
BACKGROUND
The Orange County Sanitation District's (Sanitation District) legislative affairs program includes
advocating the Sanitation District's legislative interests, sponsoring legislation (where appropriate),
and seeking Local, State, and Federal funding for projects and programs.
Staff will provide an update on recent legislative and grant activities.
RELEVANT STANDARDS
• Maintain influential legislative advocacy and a public outreach program
• Build brand, trust, and support with policy makers and community leaders
• Maintain collaborative and cooperative relationships with regulators, stakeholders, and
neighboring communities
PROBLEM
Without a strong advocacy program, elected officials may not be aware that the Sanitation District is
more than a wastewater treatment plant - treating and sending water to the ocean.
The Sanitation District is an environmentally engaged organization which recycles more than 50
percent of its wastewater. Additionally, to help meet the goal of 100 percent recycling, the Sanitation
District uses the byproducts from the wastewater treatment process to produce biosolids to fertilize
crops and energy used to help power the two plants in Fountain Valley and Huntington Beach.
PROPOSED SOLUTION
Continue to work with Local, State, and Federal officials to advocate the Sanitation District's
Orange County Sanitation District Page 1 of 2 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-608 Agenda Date: 9/25/2019 Agenda Item No: 15.
legislative interests. Help to create/monitor legislation and grants that would benefit the Sanitation
District, the wastewater industry, and the community as a whole. To assist in our relationship building
activities, we will continue to reach out to our elected officials providing facility tours, one-on-one
meetings, and trips to D.C. and Sacramento.
TIMING CONCERNS
N/A
RAMIFICATIONS OF NOT TAKING ACTION
If we do not work with Local, State, and Federal elected officials, legislation could be passed that
negatively affects the Sanitation District and the wastewater industry as a whole. Additionally, this
could affect our chances of receiving grant funding.
ADDITIONAL INFORMATION
Save the Date: The Sanitation District's State of the District will be held on Friday, October 25 from 8
a.m. to 10 a.m. at Mile Square Golf Course in Fountain Valley. The event will host Local, State, and
Federal dignitaries and provide an update on the Sanitation District, agency accomplishments, and
the future direction of the agency. The Save the Date will be sent next month.
CEQA
N/A
FINANCIAL CONSIDERATIONS
N/A
ATTACHMENT
The following attachment(s) may be viewed on-line at the OCSD website (www.ocsd.com) with the complete
agenda package:
• Federal Update - ENS Resources
• Federal Legislative Matrix - ENS Resources
• State Update - Townsend Public Affairs
• State Legislative Matrix - Townsend Public Affairs
• Grant Matrix
• September 9, 2019 Legislative and Public Affairs Committee Presentations
Orange County Sanitation District Page 2 of 2 Printed on 9/19/2019
powered by LegistarTM
■ ' 1 i 7%
LLl V6P
RESOURCES
MEMORANDUM
TO: Rebecca Long
FROM: Eric Sapirstein
DATE: August 19, 2019
SUBJECT: Washington Update
Congress remained in recess for the past month and, as a result, minimal formal
legislative work transpired. However, congressional staff did continue discussions
on finding common ground on key legislation that is considered important for
passage in the remaining months of the session that concludes in mid-December.
The following provides an update of issues of interest to OCSD.
Fiscal Year 2020 Spending Decisions to be Finalized in Coming Months
The budget agreement reached prior to the August recess put in place the path
forward to complete final spending bills for the coming fiscal year 2020 that begins
on October 1. According to the Senate Committee on Appropriations leadership, the
goal is to package spending bills into "mini-buses" similar to the House-passed
spending bills.Assuming that this approach is successful, it is conceivable that final
agreements on some of the twelve annual spending bills could be achieved by the
end of September. However, it is more likely that the limited time in September to
finalize spending bills could require a short-term stopgap spending bill to continue
governmental operations through October. Regardless of this situation, it appears
increasingly likely that the Senate will agree with the House funding levels for water
infrastructure spending programs, paving the way for adequate funding of the Clean
Water State Revolving Fund (SRF),Water Infrastructure Finance and Innovation Act
(WIFIA) and other water quality programs.
ENS Resources,Inc.
1901 Pennsylvania Avenue,N.W.
Suite 1005
Washington,D.C.20006
Phone 202.466.3755/Telefax 202.466.3787
2 1 P a g e
Regulation and Remediation of PFAS/PFOA
The ongoing focus in Congress to develop a process to address the monitoring and
cleanup of Per- and Polyfluoroalkyl Substances - (PFAS/PFOA) sites and discharges
remains in play. The House and Senate committees with jurisdiction over clean
water and drinking water laws continue to work on the development of compromise
language that could lead to a national drinking water standard for PFAS/PFOA
chemicals, along with monitoring requirements. A key issue of discussion involves
efforts by the House to require the designation of PFAS/PFOA chemicals as
hazardous waste under Superfund. This mandate, if enacted into law, could subject
agencies that discharge effluent with the chemicals or whose biosolids have traces
of the chemicals to be subject to management standards for hazardous waste
disposal and/or liability for subsequent cleanups. Additionally, provisions that
would require US Environmental Protection Agency (USEPA) to issue guidance on
the management and disposal of biosolids and other materials that might be
contaminated with the chemicals is also under review. Because the White House
has issued a veto threat on the legislation (National Defense Authorization Act) that
includes the PFAS/PFOA provisions, it remains unclear whether a final bill will
actually contain these objectionable provisions.
Clean Water SRF Infrastructure Bill Slated for Mark-Up
Efforts in the House Committee on Transportation & Infrastructure to mark-up H.R.
1497 that would renew the clean water SRF program at$15 billion over five years
appear to be nearing a decision to procced with votes. According to congressional
staff, a mid-September mark-up is anticipated. Within this bill, we expect that the
legislation will also address funding of green infrastructure, disadvantaged
community assistance,workforce assistance, and affordability mandates. Currently,
staff continue to discuss options to address the authority to issue National Pollutant
Discharge Elimination System (NPDES) permit terms for a period of up to ten years.
OCSD
Federal
Bills of Interest
OTHER=EELTHOR OCSID POSITION
POSITIONS
Federal Legislation i 2020
Water Recycling Investment and Improvement Act. Establishes a House- 6/13/19
H.R. 1162 Rep. Grace Napolitano (D-CA) grant program for the funding of water recycling and reuse projects, Subcommittees Watch CASA SUPPORTS
and for other purposes. Hearings held
Water Quality Protection and Job Creation Act of 2019. Provides House -03/06/2019
nearly$23.5 billion in direct infrastructure investment over the next five Referred to the
years to address wastewater infrastructure and local water quality Subcommittee on
H.R. 1497 Rep. Peter DeFazio (D-OR) challenges. This bill allocates $20 billion in grants for the Clean Water Water Resources and Watch CASA SUPPORTS
State Revolving Fund. Environment
To require the Administrator of the Environmental Protection House -2/7/19
Agency to shall designate per-and polyfluoroalkyl substances as Referred tp
hazardous substances under the Comprehensive Environmental Subcommittee on
H.R. 535 Rep. Debbie Dingell (D-MI) Watch NYC
Response, Compensation, and Liability Act of 1980. Railroads, Pipelines,
and Hazardous
Materials
Pacific Northwest Earthquake Preparedness Act of 2019. House -2/6/19 Passed
Requires the FEMA to develop a plan for the purchase and installation House by voice vote,
of an earthquake early warning system for the Cascadia Subduction received in Senate and
H.R. 876 Rep. Peter DeFazio (D-OR) Zone. The term "Cascadia Subduction Zone" referred to Committee Watch NYC
on Homeland Security
and Governmental
Affairs
Regulatory Certainty for Navigable Waters Act. Repeals the Waters House -2/7/19
Rep. Jaime Herrera Beutler(R- of the United States rule and amend the Federal Water Pollution Referred to
H.R. 667 WA) Control Act definition of navigable waters, and for other purposes. Subcommittee on Watch NYC
Water Resources and
Environment
Updated August 2019
OCSD
Federal
Bills of Interest
AUTHORBILL SUMM LATEST ACTIONOCSID POSITION
OTHER
POSITIONS
A bill to encourage the research and use of innovative materials Senate- 2/7/19
and associated techniques in the construction and preservation Referred to Committee
S. 403 Sen. Sheldon Whitehouse (D-RI) of the domestic transportation and water infrastructure system, on Environment and Watch NYC
and for other purposes. Public Works
To require the Corps of Engineers to notify affected communities House -2/7/19
before releasing water contaminated with cyanobacteria from Referred to
H.R. 977 Rep. Brian Mast(R-FL) flood risk management projects, and for other purposes. Subcommittee on Watch NYC
Water Resources and
Environment
To amend the Federal Water Pollution Control Act to limit House -2/7/19
attorney fees and penalties in citizen suits, and for other Referred to
H.R. 892 Rep. Duncan Hunter(R-CA) purposes. Subcommittee on Watch NYC
Water Resources and
Environment
California New River Restoration Act of 2019. Requires the USEPA House -2/7/19
to establish a California New River restoration program for the New Referred to
H.R. 358 Rep. Juan Vargas (D-CA) River. USEPA must(1) implement projects, plans, and initiatives for Subcommittee on Watch NYC
the New River supported by the California-Mexico Border Relations Water Resources and
Council; and (2) provide grants and technical assistance for Environment
coordinating restoration and protection activities.
A bill to amend the Federal Water Pollution Control Act to clarify Senate- 2/7/19
the definition of navigable waters, and for other purposes. Referred to Committee
S. 376 Sen. Rand Paul (R-KY) on Environment and Watch NYC
Public Works
National Infrastructure Development Bank Act. Facilitates efficient House -2/7/19
investments and financing of infrastructure projects and new job Referred to
creation through the establishment of a National Infrastructure Subcommittee on
H.R. 658 Rep. Rosa DeLauro Development Bank, and for other purposes. Economic Watch NYC
Development, Public
Buildings, and
Emergency
Management
Updated August 2019
OCSD
Federal
Bills of Interest
AUTHOR SUMMARY LATEST ACTIONOCSID POSITION
OTHER
POSITIONS
To amend the Water Resources Development Act of 1986 to House- 2/12/19
repeal the authority relating to reprogramming during national Referred to the
H.R. 1137 Rep. John Garamendi (D-CA) emergencies. Subcommittee on Watch NYC
Water Resources and
Environment
Coastal Communities Adaption Act. Improves the resilience of the House - 3/619
built and natural environment to natural disasters and climate change Referred to
H.R. 1317 Rep. Harley Rouda (D-CA) using, among other measures, natural and nature-based features, and Subcommittee on Watch NYC
for other purposes. Water Resources and
Environment
A bill to require the Administrator of the Environmental Senate -2/28/19
Protection Agency to designate per-and polyfluoroalkyl Referred to Committee
S. 638 Sen. Tom Carper(D-DE) substances as hazardous substances under the Comprehensive on Environment and Watch NYC
Environmental Response, Compensation, Liability Act of 1980, Public Works
and for other purposes.
A bill to provide adequate funding for water and sewer Senate -2/28/19
infrastructure, and for other purposes. Referred to Committee
S. 611 Sen. Bernie Sanders (I-VT) on Environment and Watch NYC
Public Works
To amend the Federal Water Pollution Control Act to reauthorize House -4/9/19 Passed
certain programs relating to nonpoint source management, and House 329-56.
for other purposes. Received in Senate,
H.R. 1331 Rep. Angie Craig (D-MN) referred to Committee Watch NYC
on Environment and
Public Works
To amend the Federal Water Pollution Control Act with respect to House- 3/15/19
permitting terms, and for other purposes. Referred to CASA, NACWA,
H.R. 1764 Rep. John Garamendi (D-CA) Subcommittee on Watch ACWA- Support
Water Resources and
Environment
Updated August 2019
OCSD
Federal
Bills of Interest
AUTHORBILL ACTION� LATEST OCSID POSITION
OTHER
POSITIONS
PFAS Detection Act of 2019. Requires the Director of the United Senate - 3/28/19
States Geological Survey to perform a nationwide survey of Referred to Committee
S. 950 Sen. Debbie Stabenow(D-MI) perfluorinated compounds, and for other purposes. on Environment and Watch NYC
Public Works
BLUE GLOBE Act. Improves data collection and monitoring of the Senate - 3/28/19
Great Lakes, oceans, bays, estuaries, and coasts, and for other Referred to Committee
S. 933 Sen. Sheldon Whitehouse (D-RI) purposes. on Commerce, Watch NYC
Science, and
Transportation
Coordinated Ocean Observations and Research Act of 2019. Senate-4/3/19
Reauthorizes the Integrated Coastal and Ocean Observation System Referred to Committee
Act of 2009, to clarify the authority of the Administrator of the National on Commerce,
S. 914 Sen. Roger Wicker(R-MS) Oceanic and Atmospheric Administration with respect to post-storm Science, and Watch NYC
assessments, and to require the establishment of a National Water Transportation
Center, and for other purposes.
Smart Energy and Water Effeciency Act of 2019. Provides for a House -4/9/19
smart water resource management pilot program. Referred to Committee
H.R. 2019 Rep. Jerry McNerney(D-CA) on Science, Space, Watch NYC
and Technology
Indian Water Rights Settlement Extension Act. Amends the House -4/4/19
H.R. 1904 Rep. Raul Grijalva (D-CA) Omnibus Public Land Management Act of 2009 to make the Committee on Natural Watch NYC
Reclamation Water Settlements Fund permanent. Resources Hearings
Held
Water Quality Certification Improvement Act of 2019. Amends the House-4/11/19
Federal Water Pollution Control Act to make changes with respect to Referred to
H.R. 2205 Rep. David McKinley(R-WV) water quality certification, and for other purposes. Subcommittee on Watch NYC
Water Resources and
Environment
Updated August 2019
OCSD
Federal
Bills of Interest
•
Digital Coast Act. Requires the Secretary of Commerce, acting House - 5/8/19
through the Administrator of the National Oceanic and Atmospheric Subcommittees
Administration, to establish a constituent-driven program to provide a hearings held
Rep. Dutch Ruppersberger(D- digital information platform capable of efficiently integrating coastal
H.R. 2189 MD) data with decision-support tools, training, and best practices and to Watch NYC
support collection of priority coastal geospatial data to inform and
improve local, State, regional, and Federal capacities to manage the
coastal region, and for other purposes.
A bill to require the Secretary of Commerce, acting through the Senate-4/9/19
Administrator of the National Oceanic and Atmospheric Referred to Committee
Administration, to establish a constituent-driven program to on Commerce,
provide a digital information platform capable of efficiently Science, and
S. 1069 Sen. Tammy Baldwin (D-WI) integrating coastal data with decision-support tools, training, and Transportation Watch NYC
best practices and to support collection of priority coastal
geospatial data to inform and improve local, State, regional, and
Federal capacities to manage the coastal region, and for other
purposes.
A bill to amend the Federal Water Pollution Control Act to make Senate-4/9/19
changes with respect to water quality certification, and for other Referred to Committee
S. 1087 Sen. John Barrasso (R-WY) purposes. on Environment and Watch NYC
Public Works
S.A.V.E. Water Resoures Act. Promotes water supply reliability and House- 6/13/19
H.R. 2473 Rep. Josh Harder(D-CA) improved water management for rural communities, the State of Subcommittees Watch NYC
California, and the Nation, and for other purposes. Hearings held
Safe Drinking Water Assistance Act of 2019. Improves and Senate -4/30/19
coordinate interagency Federal actions and provide assistance to Referred to Committee
S. 1251 Sen. Jeanne Shaheen (D-NH) States for responding to public health challenges posed by emerging on Environment and Watch NYC
contaminants, and for other purposes. Public Works
Updated August 2019
OCSD
Federal
Bills of Interest
AUTHORBILL ACTION • � - • •
OTHER
—a LATESTPOSITIONS
WISE Act. Amends the Federal Water Pollution Control Act to require House - 5/1/19
Rep. Debbie Mucarsel-Powell (p a certain percentage of funds appropriated for revolving fund Referred to
H.R. 2458 FL) capitalization grants be used for green projects, and for other Subcomittee of Water Watch NYC
purposes. Resrources and
Environment
Protect Drinking Water from PFAS Act of 2019. Requires the House-4/29/19
Environmental Protection Agency(EPA)to address the level of Referred to Committee
perfluoroalkyl and polyfluoroalkyl substances (PFAS) in drinking water. on Energy and
H.R. 2377 Rep. Brendan Boyle (D-PA) Specifically, the EPA must publish a maximum contaminant level goal Commerce Watch NYC
and promulgate a national primary drinking water regulation for total
PFAS. PFAS are man-made chemicals that may lead to adverse
human health effects.
To assist community water systems affected by PFAS House - 5/7/19
H.R. 2533 Rep. Frank Pallone (D-NJ) contamination, and for other purposes. Referred to Committee Watch NYC
on Energy and
Commerce
To require the Administrator of the Environmental Protection House - 5/7/19
H.R. 2566 Rep. Darren Soto (D-FL) Agency to revise the Safer Choice Standard to provide for a Safer Referred to Committee Watch NYC
Choice label for pots, pans, and cooking utensils that do not on Energy and
contain PFAS, and for other purposes. Commerce
PFAS Right-To-Know Act. Amends the Emergency Planning and House - 5/8/19
H.R. 2577 Rep. Antonio Delgado (D-NY) Community Right-To-Know Act of 1986 to include per- and Referred to Committee Watch NYC
polyfluoroalkyl substances on the Toxics Release Inventory, and for on Energy and
other purposes. Commerce
A bill to encourage Federal agencies to expeditiously enter into Senate-5/8/19
or amend cooperative agreements with States for removal and Referred to Committee
S. 1372 Sen. Debbie Stabenow(D-MI) remedial actions to address PFAS contamination in drinking, on Environment and Watch NYC
surface, and ground water and land surface and subsurface Public Works
strata, and for other purposes.
Updated August 2019
OCSD
Federal
Bills of Interest
7M
Ce
- ,, ,, : • • - • •
•
• •
Labor, Health and Human Services, Eduation, Defense, State, House- 6/19/19
Foreign Operations, and Energy and Water Development Passed House 226-
H.R. 2740 Rep. Rosa De Lauro (D-CT) Appropriations Act, 2020. Making appropriations for energy and 203 Watch NYC
water development and related agencies for the fiscal year ending
September 30, 2020, and for other purposes.
Commerce, Justice, Science, Agriculture, Rural Development, House -6/25/19 Pased
Food and Drug Administraiton, Military Construction, Veterans House 227-194
H.R. 3055 Rep. Jose Serrano (D-NY) Affairs, Transportation, and House and Urban Development Watch NYC
Appropriations Act, 2020. Making appropriations for the Department
of the Interior, environment, and related agencies for the fiscal year
ending September 30, 2020, and for other purposes.
To establish a Water Infrastructure Trust Fund, and for other House- 5/15/19
purposes. Referred to
H.R. 2705 Rep. Earl Blumenauer(D-OR) Subcommittee on Watch NYC
Water Resources and
Environment
To standardize and extend certain Buy America Provisions. House- 5/16/19
H.R. 2755 Rep. Brendan Boyle (D-PA) Referred to Watch NYC
Subcommittee on
Aviation
Protect Drinking Water from PFAS Act of 2019. A bill to amend the House- 5/15/19
Safe Drinking Water Act to require the Administrator of the Referred to Committee
S. 1473 Sen. Kristen Gillibrand (D-NY) Environmental Protection Agency to set maximum contaminant levels on Environment and Watch NYC
for certain chemicals, and for other purposes. Public Works
Reinventing Economic Partnerships and Infrastructure Senate - 5/16/19
Redevelopment Act. A bill to facilitate efficient investments and Referred to Committee
S. 1535 Sen. Mark Warner(D-VA) financing of infrastructure projects and new, long-term job creation on Finance Watch NYC
through the establishment of an Infrastructure Financing Authority, and
for other purposes.
Updated August 2019
OCSD
Federal
Bills of Interest
FM
• - I:&-j ff-"t"I Lei i • - • •
•
• •
Stop Sewage Overflow Act. To make certain municipalities eligible House- 5/16/19
for grants under the Federal Water Pollution Control Act, and for other Referred to
H.R. 2776 Rep. Lori Trahan (D-MA) purposes. Subcommittee on Watch NYC
Water Resources and
Environment
PFAS Monitoring Act of 2019. To amend the Safe Drinking Water House- 5/16/19
H.R. 2800 Rep. Elissa Slotkin (D-MI) Act to require continued and expanded monitoring of perfluoroalkyl Referred to Committee Watch NYC
and polyfluoroalkyl substances in drinking water, and for other on Energy and
purposes. Commerce
A bill to include certain perfluoroalkyl and polyfluoroalkyl Senate -6/27/19
substances in the toxics release inventory, and for other Passed as an
S. 1507 Sen. Shelley Moore Capito (D- purposes. amendment to Watch NYC
WV) National Defense
Authorization Act(S.
1790)
Contaminant and Lead Electronic Accounting and Reporting Senate - 5/22/19
Requirements for(CLEARR) Drinking Water Act of 2019. Amends Referred to Committee
S. 1613 Sen. Ed Markey(D-MA) the Safe Drinking Water Act to update and modernize the reporting on Environment and Watch NYC
requirements for contaminants, including lead, in drinking water, and Public Works
for other purposes.
Aquifer Recharge Flexibility Act. Provides flexibility to allow greater Senate - 7/18/19
S. 1570 Sen. James Risch (R-ID) aquifer recharge, and for other purposes. Subcommittee Watch NYC
Hearings Held
Aquifer Recharge Flexibility Act. Provides flexibility to allow greater House- 5/21/19
H.R. 2871 Rep. Russ Fulcher(R-ID) aquifer recharge, and for other purposes. Referred to Committee Watch NYC
on Natural Resources
Local Water Protection Act. Amends the Federal Water Pollution Senate - 5/22/19
Control Act to reauthorize certain programs relating to nonpoint source Referred to Committee
S. 1604 Sen. Amy Klobuchar(D-MN) management, and for other purposes. on Environment and Watch NYC
Public Works
Updated August 2019
OCSD
Federal
Bills of Interest
AUTHORBILL ACTION� LATEST OCSID POSITION
OTHER
POSITIONS
Living Shorelines Act of 2019. Directs the Administrator of the Senate- 6/5/19
National Oceanic and Atmospheric Administration to make grants to Referred to Committee
State and local governments and nongovernmental organizations for on Commerce,
S. 1730 Sen. Kamala Harris (D-CA) purposes of carrying out climate-resilient living shoreline projects that Science and Watch NYC
protect coastal communities by supporting ecosystem functions and Transportation
habitats with the use of natural materials and systems, and for other
purposes.
To direct the Administrator of the National Oceanic and House- 7/25/19
Atmospheric Administration to make grants to State and local Subcommittee
governments and nongovernmental organizations for purposes Hearings held
H.R. 3115 Rep. Frank Pallone (D-NJ) of carrying out climate-resilient living shoreline projects that Watch NYC
protect coastal communities by supporting ecosystem functions
and habitats with the use of natural materials and systems, and
for other purposes.
Safe Water for Military Families Act. Directs the Secretary of House- 6/12/19
H.R. 3226 Rep. Andy Kim (D-NJ) Defense to prohibit the use of firefighting foam containing perfuoroalkyl Referred to Committee Watch NYC
or polyfluoroalkyl substances, and for other purposes. on Armed Services
A bill to require the Administrator of the Environmental Senate - 6/13/19
Protection Agency to establish a discretionary grant program for Referred to Committee
S. 1837 Sen. Kristen Gillibrand (D-NY) drinking water and wastewater infrastructure projects, and for on Environment and Watch NYC
other purposes. Public Works
To require the Administrator of the Environmental Protection House- 6/14/19
Agency to establish a discretionary grant program for drinking Referred to
H.R. 3254 Rep. Antonio Delgado (D-NY) water and wastewater infrastructure projects, and for other Subcommittee on Watch NYC
purposes. Water Resources and
Environment
Wastewater Infrastructure Workforce Investment Act. To amend House- 6/27/19
the Federal Water Pollution Control Act with respect to wastewater Referred to the
H.R. 3521 Rep. Greg Stanton (D-AZ) infrastructure workforce development, and for other purposes. Subcommittee on Watch NYC
Water Resources and
Environment
Updated August 2019
OCSD
Federal
Bills of Interest
AUTHORBILL SUMM LATEST ACTIONOCSID POSITION
OTHER
POSITIONS
National Opportunity for Lead Exposure Accountability and Senate - 7/11/19
Deterrence Act of 2019. To amend the Safe Drinking Water Act to Referred to Committee
S. 2086 Sen. Tammy Duckworth (D-IL) improve transparency under the national primary drinking water on Environment and Watch NYC
regulations for lead and copper, and for other purposes. Public Works
Drought Resiliency and Water Supply Infrastructure Act. To Senate - 7/18/19 CASA, NACWA,
S. 1932 Sen. Cory Gardner(R-CO) support water infrastructure in Reclamation States, and for other Subcommittee Watch NWRA, ACWA -
purposes. Hearings Held support
Water Resources Research Amendments Act. To amend the House- 7/25/19
Water Resources Research Act of 1984 to reauthorize grants for and Subcommittee on
H.R. 3510 Rep. Josh Harder(D-CA) require applied water supply research regarding the water resources Water, Oceans, and Watch NYC
research and technology institutes established under that Act. Wildlife held
Desalination Development Act. To promote desalination project House- 7/25/19
H.R. 3723 Rep. Mike Levin (D-CA) development and drought resilience, and for other purposes. Subcommittee on Watch NYC
Water, Oceans, and
Wildlife held
National Opportunity for Lead Exposure Accountability and House- 7/10/19
H.R. 3677 Rep. Dan Kildee (D-MI) Deterrence Act of 2017. To amend the Safe Drinking Water Act to Referred to Committee Watch NYC
improve transparency under the national primary drinking water on Energy and
regulations for lead and copper, and for other purposes. Commerce
Creating Opportunity And Sustainability Through Science Act. To House- 7/23/19
require research in coastal sustainability and resilience, to ensure that Referred to
H.R. 3919 Rep. Seth Moulton (D-MA) the Federal Government continues to implement and advance coastal Committees on Watch NYC
resiliency efforts, and for other purposes. Natural Resources
and Science, Space,
and Technology
Environmental Justice Act of 2019. To require Federal agencies to Senate - 7/23/19
address environmental justice, to require consideration of cumulative Referred to Committee
S. 2236 Sen. Cory Booker(D-NJ) impacts in certain permitting decisions, and for other purposes. and Public Works Watch NYC
Updated August 2019
OCSD
Federal
Bills of Interest
•
To provide supplemental appropriations for safe and secure Senate - 7/26/19
water, and for other purposes. Referred to Committee
S. XXXX Sen. Kamala Harris (D-CA) on Environment and Watch NYC
Public Works
To provide supplemental appropriations for safe and secure House- 7/26/19
water, and for other purposes. Referred to
Committees on Energy
and Commerce,
H.R. 4033 Rep. Dan Kildee (D-MI) Budget, Ways and Watch NYC
Means, Natural
Resources,
Agriculture, and
Transportation and
Infrastructure
Updated August 2019
OCSD
Federal
Bills of Interest
•
To amend the Water Resources Reform and Development Act of House- 7/26/19
2014 to modify the procedure for communicating certain Referred to
H.R. 3944 Rep. Kevin Hem (R-OK) emergency risks, and for other purposes. Subcommittee on Watch NYC
Water Resources and
Environment
Environmental Justice Act of 2019. To require Federal agencies to House- 8/15/19
address environmental justice, to require consideration of cumulative Referred to
H.R. 3923 Rep. Raul Ruiz(D-CA) impacts in certain permitting decisions, and for other purposes. Subcommittee on the Watch NYC
Constitution, Civil
Rights, and Civil
Liberties
Legend:
ACC-OC-Association of California Cities, Orange County
LOCC- League of California Cities
NYC- Not Yet Considered
CASA- California Association of Sanitation Agencies
NACWA- National Association of Clean Water Agencies
ACWA-Association of California Water Agencies
CSDA- California Special Districts Association
Updated August 2019
T (D/ WNSEND
P H B L I C A F F A I R S
,IT TPA 4q
To: Orange County Sanitation District
From: Townsend Public Affairs, Inc.
Date: August 19, 2019
Subject: Legislative and Public Affairs Agenda Report
State Political Update
In Sacramento, the Legislature has been very active since their return from summer
recess on August 12. All bills that failed to pass the house in which they were introduced
are now two-year bills and will be eligible for consideration in January 2020. Over 1 ,900
bills are still being considered by their respective second houses, and must be passed by
September 13, the last day of session. Following that deadline, the Legislature will
adjourn for interim recess and the Governor will have until October 13 to sign to veto all
legislation.
The Legislature will reconvene on January 6 for the second year of the two-year session.
Fiscal Year 2019-2020 State Budget
On the evening of June 27, Governor Newsom approved AB 74, the authorizing State
Budget legislation for FY 2019-20. The Budget totals a record $214.8 billion and includes
many of the Governor's priorities, such as healthcare for undocumented immigrants
between the ages of 19-25, homelessness funding, and some of the highest education
funding levels ever. The Budget package also assumes an estimated $19.4 billion in
reserves, including $16.5 billion in the Proposition 2 mandated "rainy day fund",
continuing the tradition of saving money in anticipation of an economic downturn.
Below is a summary of key highlights in the FY 2019-20 State Budget:
Safe & Affordable Drinking Water
• Authorized a $130 million per year continuous appropriation to provide
communities with the resources to deliver clean drinking water, funded from a long-
term commitment of Greenhouse Gas Reduction Funds through Cap and Trade
revenues.
Natural Resources
• Appropriated $1 billion across multiple departments to continue development and
implementation of Proposition 68 bond programs;
• Provided $45 million in one-time funding for multiple agencies including the
Department of Parks and Recreation, the Department of Forestry and Fire
Protection, the California Conservation Corps, and the California Tahoe
Conservancy to address their most critical deferred maintenance needs;
• Included $92 million to implement multi-benefit flood improvement projects;
• Approved trailer bill language to extend the sunset of the Habitat Conservation
Fund competitive grant program by 10 years, to January 1, 2030.
Transportation
• Appropriated an additional $2 billion for Road Maintenance and Rehabilitation
Account (RMRA) for local and capital funding programs under SB 1.
Cap and Trade
• Invested $1.4 billion in discretionary Greenhouse Gas Reduction Funds (GGRF)
in 2019-20.
• Specifically, the Cap and Trade expenditure plan included the following spending
programs and activities:
o $245 million for implementation of AB 617 (Garcia, 2018) - Community Air
Protection & Local Programs to Reduce Air Pollution;
o $238 million for the Clean Vehicle Rebate Project;
o $182 million for clean trucks, buses, and off-road freight equipment
including the Hybrid and Zero-Emission Truck and Bus Voucher Incentive
Project and advanced technology freight demonstration and pilot
commercial deployment projects;
o $165 million for Healthy & Resilient Forests to reduce the risk of wildfire;
o $100 million for safe drinking water programs;
o $60 million for the Transformative Climate Communities program;
o $30 million for the Urban Greening Program.
June 2019 Report 2
Housing & Homelessness
• $500 million in one-time funds for housing related infrastructure to help boost
needed construction;
• $500 million in one-time funds for a mixed income loan program through CaIHFA;
• $500 million in one-time funds to expand the Low-Income Housing Tax Credit;
• $250 million for planning grants to help local jurisdictions work through the
Regional Housing Needs Assessment;
• $1 million for the development of permanent supportive housing through the
Orange County Housing Finance Trust;
• $650 million in one-time funds to help local jurisdictions address the homelessness
crisis.
Other Items
• The Budget also provided tens of millions of dollars more for 2020 Census
outreach, extending California's historic investment to help ensure a complete
count;
• Included over $300 million for disaster preparedness, including communications
infrastructure, and new funding to help communities affected by disasters;
• Authorized up to $15 million for cannabis equity programs to prevent illegal
operations;
• The Budget also temporarily suspends the sales tax on diapers and menstrual
products.
• Included $20 million for the Southern California Veterans Cemetery Master
Development Fund
Safe Drinking Water Proposals
On July 24, the Governor signed SB 200 (Monning), which creates the Safe and
Affordable Drinking Water Fund, providing the legal structure and process for funding safe
drinking water solutions for disadvantaged communities in California that currently do not
have that access.
The passage of SB 200 follows the June 27 enactment of the 2019-20 State Budget,
which sets forth the first part of the funding solution. The State Budget provides $130
million for Fiscal Year 2019-20 for safe drinking water solutions in disadvantaged
communities that do not have access to safe drinking water.
C) June 2019 Report 3
In the first year, $100 million of the funding will come from the Greenhouse Gas Reduction
Fund (GGRF) and $30 million from the General Fund. After the first year, SIB 200 will
provide that the funding will be 5% of the GGRF continuously appropriated — capped at
$130 million per year. The agreement includes General Fund funding as a backstop if 5%
of the GGRF is less than $130 million in any year. The funding will sunset in 2030.
OCSD Legislative Plan: Tactic - Support tax reform that protects public agencies.
2020 Proposed Water Bond
AB 352 (E. Garcia) was gut and amended on August 14 to be the Wildfire Prevention,
Safe Drinking Water, Drought Preparation, and Flood Protection Bond Act of 2020. This
legislation would establish a $3.92 billion bond that will provide funding for drought, water,
parks, climate, and coastal protection. The bond would be placed on the ballot for
approval by the voters at the November 3, 2020 statewide general election.
The current bond language includes $925 million for water resources.
• $275 million of that total amount shall be used for safe drinking water project,
grants and loans to assist with septic system upgrades or consolidation of septic
systems in order to address water quality contamination in disadvantaged
communities, projects that implement countywide drought and water shortage
contingency plans, sustainable groundwater management projects, recharge
projects and projects that improve water data collection, monitoring and
management.
• $100 million of the total amount shall be available for groundwater sustainability
projects that provide wildlife habitat support
• $300 million shall be available for the restoration of rivers, lakes and streams
• $150 million for flood management projects
• $100 million for recycled water projects
OCSD Legislative Plan: Grant Funding - Support legislation, bonds, programs and
projects that provide funding for: infrastructure construction and rehabilitation, special
studies and research or projects relating to security, environmental education, water
quality, wastewater processing, urban runoff, wastewater recycling, biosolids and
organics management, water quality improvement, resource recovery, or alternative
energy.
June 2019 Report 4
Perfluoroalkyl Substances and Polyfluoroalkyl Substances (PFAS)
The State Water Resources Control Board will have new, expansive authority to order
public water systems to monitor for per- and polyfluoroalkyl substances (PFAS) under a
new law, AB 756 (C. Garcia) that Governor Gavin Newsom signed on July 31, 2019.
AB 756 marks the California Legislature and Governor Newsom's first action related to
PFAS. AB 756 adds a section to the California Health and Safety Code that authorizes
the State Water Resources Control Board to order a public water system to monitor for
PFAS in accordance with conditions set by the Board. If any monitoring undertaken
pursuant to such State Water Board order results in a confirmed PFAS detection, the
water system must report that detection in its annual consumer confidence report.
Further, where detected levels of PFAS exceed the 70 ppt response level, the water
system must take the water source out of use or provide public notification within 30 days
of the confirmed detection. The public notification procedures set forth a variety of
requirements for providing sufficient public notice, including requiring community water
systems to provide notice by mail and e-mail to each water system customer.
AB 756 is likely only the beginning of the California Legislature's swell of bills aimed at
regulating PFAS. Once the results of the State Water Board's ordered investigations into
PFAS in drinking water and groundwater are in, it is likely that the California Legislature,
Governor Newsom and various state regulatory agencies will continue to increase their
focus on PFAS in California with new laws and regulations. Regardless, water systems
will have a short time to plan for compliance with AB 756, as the law becomes effective
on January 1, 2020.
OCSD Legislative Plan: Source Control - Support legislation and funding mechanisms
that reduce the amount of trash, waste, chemicals, and harmful organic material that enter
the sewer system.
Additional Priority Legislation
AB 1184 (Gloria) — Public records. writing transmitted by electronic mail. retention.
Would, unless a longer retention period is required by statute or regulation, require a
public agency for purposes of the California Public Records Act to retain and preserve for
at least 2 years every writing containing information relating to the conduct of the public's
business prepared, owned, or used by any public agency that is transmitted by electronic
mail. AB 1184 Is in the Senate Appropriations Suspense File.
OCSD Legislative Plan: Special Districts - Oppose further state regulations that adversely
impact special district financing, operations, and administration.
June 2019 Report 5
SB 1 (Atkins)— California Environmental, Public Health, and Workers Defense Act of 2019
SB 1 seeks to freeze federal Clean Air Act, Clean Water Act, Safe Drinking Water Act,
Endangered Species Act, Fair Labor Standards Act, Occupational Safety and Health Act
and Coal Mine Health and Safety Act requirements to those in place as of January 19,
2017. SB 1 refers to federal requirements existing as of this date, as "baseline federal
standards." SB 1 is intended to "ensure continued protections for the environment, natural
resources, and public health and safety" in California, even if the noted federal laws are
"undermined, amended or repealed" by making the baseline environmental standards the
new floor for environmental and worker protections in California. SB 1 will be heard in
the Assembly Appropriations Committee on August 21.
OCSD Legislative Plan: Public Health - Protection of public health is OCSD's core
mission. OCSD will work cooperatively with county and state health officers to assure
local health protection.
SB 210 (Leyva) — Heavy-Duty Vehicle Inspection and Maintenance Program
SB 210 directs the Air Resources Board (ARB) to work in coordination with multiple state
agencies in order to develop and implement a Heavy-Duty Inspection and Maintenance
Program for non-gasoline, heavy-duty, on-road trucks. Specifically, SB 210 would
develop a pilot program to measure and enforce new regulations on heavy duty on-road
trucks and then require ARB to adopt a full program within two years after the pilot
program ends. SB 210 is currently in the Assembly Appropriations Committee and
will be heard on August 21.
OCSD Legislative Plan: Air Quality - Support measures that maintain and enhance
local decision-making authority, where appropriate, in the development and
implementation of air quality attainment strategies
SB 667 (Hueso) — Greenhouse gases. recycling infrastructure and facilities.
SB 667 would require CalRecycle in coordination with the Treasurer to develop financial
incentive mechanisms, including, but not limited to, loans and incentive payments, to fund
organic waste diversion and recycling infrastructure. This bill also requires CalRecycle to
develop and amend a 5-year investment strategy to drive innovation and support
technological development and infrastructure. SB 667 is currently in the Assembly
Appropriations Committee and will be heard on August 21.
OCSD Legislative Plan: Biosolids and Biogas -Support the promotion and funding of local
pilot programs, studies, and research for the beneficial use of biosolids.
June 2019 Report 6
OCSD
State
Bills of Interest
ProposedWbsITION POSITIONS
High Priority
AB 11 Chiu [D] Community Redevelopment Law of 2019 Current law dissolved Failed to pass the Watch State Priorities: Continue to ACCOC - NYC
redevelopment agencies as of February 1, 2012, and designates Assembly monitor the state budget LOCC -Watch
successor agencies to act as successor entities to the dissolved Appropriations process and actively protect CASA- NYC
redevelopment agencies. This bill, the Community Redevelopment Law Committee and is now a the allocation of local ACWA- NYC
of 2019, would authorize a city or county, or two or more cities acting two-year bill property taxes to CSDA- Oppose
jointly, to propose the formation of an affordable housing and special districts. unless amended
infrastructure agency by adoption of a resolution of intention that meets
specified requirements, including that the resolution of intention include a
passthrough provision and an override passthrough provision, as
defined.
AB 68 Ting [D] Land use: accessory dwelling units. The Planning and Zoning Law Currently in the Senate Watch Legislative and Regulatory ACCOC - NYC
authorizes a local agency to provide, by ordinance, for the creation of Appropriations Policies: Special Districts - LOCC -Watch
accessory dwelling units in single-family and multifamily residential Suspense File Oppose further state CASA- NYC
zones and sets forth required ordinance standards, including, among regulations that adversely ACWA- NYC
others, lot coverage. This bill would delete the provision authorizing the impact special district CSDA-Watch
imposition of standards on lot coverage and would prohibit an ordinance financing, operations, and
from imposing requirements on minimum lot size. administration.
AB 69 Ting [D] Land use: accessory dwelling units. Current law requires the Currenity in the Senate Watch Legislative and Regulatory ACCOC - NYC
Department of Housing and Community Development to propose Appropriations Policies: Special Districts - LOCC -Watch
building standards to the California Building Standards Commission, and Suspense File Oppose further state CASA- NYC
to adopt, amend, or repeal rules and regulations governing, among other regulations that adversely ACWA- NYC
things, apartment houses and dwellings, as specified. This bill would impact special district CSDA-Watch
require the department to propose small home building standards financing, operations, and
governing accessory dwelling units smaller than 800 square feet,junior administration.
accessory dwelling units, and detached dwelling units smaller than 800
square feet, as specified, and to submit the small home building
standards to the California Building Standards Commission for adoption
on or before January 1, 2021.
AB 134 Bloom [D] Safe Drinking Water Restoration Would require the State Water Two Year Bill Watch State Priorities: Support ACCOC - NYC
Resources Control Board to report to the Legislature by July 1, 2025, on legislation or regulations that LOCC -Watch
its progress in restoring safe drinking water to all California communities restrict the use of CASA- NYC
and to create an internet website that provides data transparency for all microplastics in any product ACWA- NYC
of the board's activities described in this measure. The bill would require that is disposed of through CSDA-Watch
the board to develop metrics to measure the efficacy of the fund in the sewer system.
ensuring safe and affordable drinking water for all Californians.
OCSD
State
Bills of Interest
AUTHORBILL SUMMARY d LATEST ACTION OCSD LEGISLATIVE PLAN OTHER
AB 223 Stone [D] California Safe Drinking Water Act: microplastics The California Safe Two Year Bill Watch State Priorities: Support ACCOC - NYC
Drinking Water Act requires the State Water Resources Control Board to legislation or regulations that LOCC -Watch
administer provisions relating to the regulation of drinking water to restrict the use of CASA- NYC
protect public health. Current law requires the state board, on or before microplastics in any product ACWA- NYC
July 1, 2020, to adopt a definition of microplastics in drinking water and, that is disposed of through CSDA-Watch
on or before July 1, 2021, to adopt a standard methodology to be used in the sewer system.
the testing of drinking water for microplastics and requirements for 4
years of testing and reporting of microplastics in drinking water, including
public disclosure of those results. This bill would require the state board,
to the extent possible, and where feasible and cost effective, to work with
the State Department of Public Health in complying with those
requirements.
AB 231 Mathis [R] California Environmental Quality Act: exemption: recycled water. Two Year Bill Watch State Priorities: Support ACCOC - NYC
Would exempt from CEQA a project to construct or expand a recycled efforts to reform the LOCC -Watch
water pipeline for the purpose of mitigating drought conditions for which California Environmental CASA- NYC
a state of emergency was proclaimed by the Governor if the project Quality Act (CEQA)to ACWA- NYC
meets specified criteria. Because a lead agency would be required to streamline current CSDA- Support
determine if a project qualifies for this exemption, this bill would impose procedures
a state-mandated local program. The bill would also exempt from CEQA and regulations for projects
the development and approval of building standards by state agencies to refurbish or replace
for recycled water systems. existing infrastructure
facilities.
AB 291 Chu Emergency preparedness Would establish a Local Emergency Two Year Bill Watch State Priorities: Secure ACCOC - NYC
Preparedness and Hazard Mitigation Fund to support staffing, planning, funding through grants and LOCC -Watch
and other emergency mitigation priorities to help local governments meet legislation for infrastructure, CASA- NYC
emergency management, preparedness, readiness, and resilience goals. collection improvements and ACWA- NYC
The bill would, upon appropriation by the Legislature, require the alternative renewable energy CSDA-Watch
Controller to transfer$500,000,000 to the fund. The bill would require the at the Fountain Valley, Plant
Office of Emergency Services to establish the Local Emergency No. 1 and Huntington Beach,
Preparedness and Hazard Mitigation Fund Committee under the Plant No. 2.
Standardized Emergency Management System Advisory Board.
AB 292 Quirk [D] Recycled water: raw water and groundwater augmentation Current Currently on Assembly Watch Legislative and Regulatory ACCOC - NYC
law requires the State Water Resources Control Board, on or before Floor Policies: Water Quality and LOCC -Watch
December 31, 2023, to adopt uniform water recycling criteria for direct Supply- Support measures CASA- NYC
potable reuse through raw water augmentation, as specified. This bill that promote and provide for ACWA- NYC
would eliminate the definition of"direct potable reuse" and instead would the use of reclaimed water CSDA- Support
substitute the term "groundwater augmentation"for"indirect potable
reuse for groundwater recharge" in these definitions. The bill would
require, on or before December 31, 2023, the state board to adopt
uniform water recycling criteria for raw water augmentation.
OCSD
State
Bills of Interest
- . • IFMGM
AB 352 E. Garcia [D] Wildfire Prevention, Safe Drinking Water, Drought Preparation, and Gut and Amend. Watch Legislative and Regulatory
Flood Protection Bond Act of 2020. Would enact the Wildfire Currently in Senate Policies: Grant Funding -
Prevention, Safe Drinking Water, Drought Preparation, and Flood Environmental Quality Support legislation, bonds,
Protection Bond Act of 2020, which, if approved by the voters, would Committee programs and projects that
authorize the issuance of bonds in the amount of$3,920,000,000 provide funding for:
pursuant to the State General Obligation Bond Law to finance a wildlife infrastructure construction
prevention, safe drinking water, drought preparation, and flood protection and rehabilitation, special
program.The bill would provide for the submission of these provisions to studies and research or
the voters at the November 3, 2020, statewide general election. projects relating to security,
environmental education,
water quality, wastewater
processing, urban runoff,
wastewater recycling,
biosolids and organics
management, water quality
improvement, resource
recovery, or alternative
energy.
AB 405 Rubio [D] Sales and use taxes: exemption: water treatment. Would exempt Two Year Bill Watch Guiding Principles: Seek ACCOC - NYC
from Sales and Use Tax the gross receipts from the sale in this state of, funds for OCSD projects LOCC -Watch
and the storage, use, or other consumption in this state of, chemicals through grants, CASA- Support
used to treat water, recycled water, or wastewater regardless of whether appropriations, or other ACWA- NYC
those chemicals or other agents become a component part thereof and means;❑ CSDA- Support
regardless of whether the treatment takes place before or after the
delivery to consumers.
AB 510 Cooley[D] Local government records: destruction of records. Current law Two Year Bill Watch Legislative and Regulatory ACCOC - NYC
authorizes the head of a department of a county or city, or the head of a Policies: Security- Support LOCC -Watch
special district to destroy recordings of telephone and radio legislation that would create CASA- NYC
communications maintained by that county, city, or special district after efficiencies around the ACWA- NYC
100 days if that person receives approval from the legislative body and retention policy of CSDA- Sponsor
the written consent of the agency attorney. This bill would exempt the surveillance video for
head of a department of a county or city, or the head of a special district innocuous recordings.
from these recording retention requirements if the county, city, or special
district adopts a records retention policy governing recordings of routine
video monitoring and recordings of telephone and radio communications.
OCSD
State
Bills of Interest
AB 587 Friedman [D] Accessory dwelling units: sale or separate conveyance Current Currently on Senate Watch Legislative and Regulatory ACCOC - NYC
property tax law establishes a welfare exemption under which property is Floor Policies: Special Districts - LOCC -Watch
exempt from taxation if the property is owned and operated by a Oppose further state CASA-Work w/
nonprofit corporation that is organized and operated for the purpose of regulations that adversely author
building and rehabilitating single-family or multifamily residences for sale, impact special district ACWA- NYC
as provided, at cost to low-income families. This bill would authorize a financing, operations, and CSDA-Watch
local agency to allow, by ordinance, an accessory dwelling unit that was administration.
created pursuant to the process described above to be sold or conveyed
separately from the primary residence to a qualified buyer if certain
conditions are met.
AB 756 Garcia [D] Public water systems: perfluoroalkyl substances and Signed into law on July Watch Legislative and Regulatory ACCOC - NYC
polyfluoroalkyl substances Would authorize the State Water 31. Policies: Source Control - LOCC -Watch
Resources Control Board to order a public water system to monitor for Support legislation and CASA-Watch
perfluoroalkyl substances and polyfluoroalkyl substances. The bill would funding mechanisms that ACWA-Watch
require a community water system or a nontransient noncommunity reduce the amount of trash, CSDA-Watch
water system, upon a detection of these substances, to report that waste, chemicals, and
detection, as specified. The bill would require a community water system harmful organic material that
or a nontransient noncommunity water system where a detected level of enter the sewer system.
these substances exceeds the response level to take a water source
where the detected levels exceed the response level out of use or
provide a prescribed public notification.
AB 841 Ting [D] Drinking water: contaminants: perfluoroalkyl and polyfluoroalkyl Two Year Bill Watch Legislative and Regulatory ACCOC - NYC
substances. Would require the Office of Environmental Health Hazard Policies: Source Control - LOCC -Watch
Assessment to adopt and complete a work plan within prescribed Support legislation and CASA-Watch
timeframes to assess which substances in the class of perfluoroalkyl and funding mechanisms that ACWA-Watch
polyfluoroalkyl substances should be identified as a potential risk to reduce the amount of trash, CSDA-Watch
human health, as provided. The bill would require the office, as part of waste, chemicals, and
those assessments, to determine which of the substances are harmful organic material that
appropriate candidates for notification levels to be adopted by the state enter the sewer system.
board. The bill would require the Office of Environmental Health Hazard
Assessment, by January 1, 2022, to provide to the Legislature an update
on the assessment.
AB 992 Mullin [D] Open meetings: local agencies: social media Would provide that the Two Year Bill Watch Legislative and Regulatory ACCOC - NYC
Ralph M. Brown Act does not apply to the posting, commenting, liking, Policies: Special Districts - LOCC -Watch
interaction with, or participation in, internet-based social media platforms Oppose further state CASA-Approve
that are ephemeral, live, or static, by a majority of the members of a regulations that adversely ACWA- NYC
legislative body, provided that a majority of the members do not discuss impact special district CSDA- Support
among themselves business of a specific nature that is within the subject financing, operations, and
matter jurisdiction of the legislative body of the local agency. administration.
OCSD
State
Bills of Interest
MLAUTHOR SUMMARY LATEST ACTION OCSD LEGISLATIVE PLAN OTHER
POSITION POSITIONS
AB 1080 Gonzalez [D] California Circular Economy and Plastic Pollution Reduction Act Currently in the Senate Watch State Priorities: Support ACCOC - NYC
Would establish the California Circular Economy and Plastic Pollution Appropriations legislation or regulations that LOCC - Support
Reduction Act, which would require the Department of Resources Committee and will be restrict the use of CASA- NYC
Recycling and Recovery, in consultation with the State Water Resources heard August 26. microplastics in any product ACWA- NYC
Control Board and the Ocean Protection Council, to adopt, on or before that is disposed of through CSDA- NYC
January 1, 2023, regulations to achieve, by 2030, a 75% reduction by the sewer system.Li
manufacturers and retailers of the waste generated from single-use
packaging and products offered for sale or sold in the state through
source reduction, recycling, or composting.
AB 1180 Friedman [D] Water: recycled water The California Safe Drinking Water Act requires Currently in the Senate Watch Legislative and Regulatory ACCOC - NYC
the State Water Resources Control Board to administer provisions Appropriations Policies: Recycled Water- LOCC -Watch
relating to the regulation of drinking water to protect public health. Committee Suspense support measures that CASA- Support
Current law requires, on or before January 1, 2020, the state board to File promote and provide for the ACWA- NYC
adopt standards for backflow protection and cross-connection control use of reclaimed water. CSDA- Support
through the adoption of a policy handbook, as specified. This bill would
require that handbook to include provisions for the use of a swivel or
changeover device to supply potable water to a dual-plumbed system
during an interruption in recycled water service.
AB 1184 Gloria [D] Public records: writing transmitted by electronic mail: retention Currently in the Senate Watch Legislative and Regulatory ACCOC - NYC
Would, unless a longer retention period is required by statute or Appropriations Policies: Special Districts - LOCC - Oppose
regulation, require a public agency for purposes of the California Public Suspense File Oppose further state CASA-Watch
Records Act to retain and preserve for at least 2 years every writing regulations that adversely ACWA- NYC
containing information relating to the conduct of the public's business impact special district CSDA- Oppose
prepared, owned, or used by any public agency that is transmitted by financing, operations, and
electronic mail. administration.
AB 1588 Gloria [D] Drinking water and wastewater operator certification programs Currently on Senate Watch Legislative and Regulatory ACCOC - NYC
Current law requires a person who operates a nonexempt wastewater Floor Policies: Special Districts - LOCC -Watch
treatment plant to possess a valid, unexpired wastewater certificate or Oppose further state CASA- Support
water treatment operator certificate of the appropriate grade. This bill, regulations that adversely ACWA- NYC
when applying for certification by the board as a water treatment impact special district CSDA-Support
operator, distribution system operator, or wastewater operator, would financing, operations, and
require operators of complex industrial facilities, including members of administration.
the military and military service veterans, to receive appropriate
equivalent experience credit and education credit for work and tasks
performed that are directly related to the operation of water or
wastewater facilities, as specified.
OCSD
State
Bills of Interest
FROM
AB 1672 Bloom [D] Solid waste: flushable products The California Integrated Waste Two Year Bill Support Legislative and Regulatory ACCOC - NYC
Management Act of 1989, administered by the Department of Resources Policies: Source Control - LOCC -Watch
Recycling and Recovery, generally regulates the disposal, management, Support legislation that CASA- Sponsor
and recycling of solid waste. This bill would, among other things, on or regulates the disposal of ACWA- Support
after January 1, 2021, prohibit a covered entity, as defined, from labeling flushable wipes. CSDA- Support
a covered product as safe to flush, safe for sewer systems, or safe for
septic systems, unless the product is a flushable wipe that meets certain
performance standards. The bill would require nonflushable products to
be labeled clearly and conspicuously to communicate that they should
not be flushed, as specified.
ACA 1 Aguiar-Curry[D] Local government financing: affordable housing and public Currently on the Watch Guiding Principles: Seek ACCOC - NYC
infrastructure: voter approval. The California Constitution prohibits the Assembly Floor funds for OCSD projects LOCC - Support
ad valorem tax rate on real property from exceeding 1% of the full cash through grants, CASA- Support
value of the property, subject to certain exceptions. This measure would appropriations, or other ACWA- NYC
create an additional exception to the 1% limit that would authorize a city, means; CSDA- Support
county, city and county, or special district to levy an ad valorem tax to
service bonded indebtedness incurred to fund the construction,
reconstruction, rehabilitation, or replacement of public infrastructure,
affordable housing, or permanent supportive housing, or the acquisition
or lease of real property for those purposes, if the proposition proposing
that tax is approved by 55% of the voters of the city, county, or city and
county, as applicable, and the proposition includes specified
accountability requirements.
SB 1 Atkins [D] California Environmental, Public Health, and Workers Defense Act Currently in the Watch Legislative and Regulatory ACCOC - NYC
of 2019. This bill seeks to freeze federal Clean Air Act, Clean Water Act, Assembly Policies: Public Health: LOCC -Watch
Safe Drinking Water Act, Endangered Species Act, Fair Labor Standards Appropriations Protection of public health is CASA- NYC
Act, Occupational Safety and Health Act and Coal Mine Health and Committee and will be OCSD's core mission. OCSD ACWA- Oppose
Safety Act requirements to those in place as of January 19, 2017. SIB 1 heard August 21 will work cooperatively with CSDA- NYC
refers to federal requirements existing as of this date, as "baseline county and state health
federal standards." SIB 1 is intended to "ensure continued protections for officers to assure local health
the environment, natural resources, and public health and safety" in protection.
California, even if the noted federal laws are "undermined, amended or
repealed" by making the baseline environmental standards the new floor
for environmental and worker protections in California
OCSD
State
Bills of Interest
AUTHORBILL SUMMARY LATEST ACTION OCSD LEGISLATIVE PLAN OTHER
POSITION 'AOL DnQ1T1QWW9__
SB 5 Beall [D] Local-State Sustainable Investment Incentive Program Would Currently in the Watch State Priorities: Continue to ACCOC - NYC
establish in state government the Affordable Housing and Community Assembly monitor the state budget LOCC - Support
Development Investment Program, which would be administered by the Appropriations process and actively protect CASA-Watch
Affordable Housing and Community Development Investment Committee and will be the allocation of local ACWA- NYC
Committee. The bill would authorize a city, county, city and county,joint heard August 21 property taxes to CSDA-Watch
powers agency, enhanced infrastructure financing district, affordable special districts.
housing authority, community revitalization and investment authority,
transit village development district, or a combination of those entities, to
apply to the Affordable Housing and Community Development
Investment Committee to participate in the program and would authorize
the committee to approve or deny plans for projects meeting specific
criteria.
SB 13 Weickowski [D] Accessory dwelling units Would authorize the creation of accessory Currently in the Watch Legislative and Regulatory ACCOC - NYC
dwelling units in areas zoned to allow single-family or multifamily Assembly Policies: Special Districts - LOCC - Oppose
dwelling use. The bill would also revise the requirements for an Appropriations Oppose further state unless amended
accessory dwelling unit by providing that the accessory dwelling unit may Committee and will be regulations that adversely CASA-Work w/
be attached to, or located within, an attached garage, storage area, or heard August 21. impact special district author
other structure, and that it does not exceed a specified amount of total financing, operations, and ACWA- NYC
floor area. administration. CSDA- Oppose
SB 33 Skinner Solid waste: reduction and recycling. The California Integrated Waste Currently in the Senate Watch Legislative and Regulatory ACCOC - NYC
Management Act of 1989, administered by the Department of Resources Rules Committee Policies: Biosolids and LOCC -Watch
Recycling and Recovery, generally regulates the disposal, management, Biogas - Limit redundant CASA- NYC
and recycling of solid waste.This bill would state the intent of the reporting requirements on ACWA- NYC
Legislature to enact legislation that would address the collapse of foreign organics, recyclable material, CSDA-Watch
recycling markets by reducing solid waste generation, encouraging and solid waste as mandated
transition to compostable or recyclable materials, and fostering domestic by AB 901.
recycling markets.
OCSD
State
Bills of Interest
REM
SB 134 Hertzberg [D] Water conservation: water loss performance standards: Currently on the Watch Legislative and Regulatory ACCOC - NYC
enforcement. Current law requires the State Water Resources Control Assembly Floor Policies: Water Supply- LOCC -Watch
Board, no earlier than January 1, 2019, and no later than July 1, 2020, to Support legislation and CASA- NYC
adopt rules requiring urban retail water suppliers to meet performance regulation that necessitate ACWA- NYC
standards for the volume of water losses. This bill would prohibit the the responsible use of water CSDA- Support
board from issuing an information order, written notice, or conservation in residential, commercial,
order to an urban retail water supplier that does not meet its urban water and industrial areas
use objective if the board determines the urban retail water supplier is
not meeting its urban water use objective solely because the volume of
water loss exceeds the urban retail water supplier's standard for water
loss and the board is taking enforcement action against the urban retail
water supplier for not meeting the performance standards for the volume
of water losses.
SB 200 Safe and Affordable Drinking Water Fund. Would establish the Safe Signed into law Watch State Tactics: Support tax ACCOC - NYC
and Affordable Drinking Water Fund in the State Treasury to help water reform that LOCC -Watch
systems provide an adequate and affordable supply of safe drinking protects public agencies CASA- NYC
water in both the near and the long term. The bill would authorize the ACWA- NYC
board to provide for the deposit into the fund of federal contributions, CSDA-Watch
voluntary contributions, gifts, grants, and bequests and would provide
that moneys in the fund are available, upon appropriation by the
Legislature, to the board to fund grants, loans, contracts, or services to
assist eligible recipients.
SB 210 Leyva [D] Heavy-Duty Vehicle Inspection and Maintenance Program. Current Currently in the Watch Legislative and Regulatory ACCOC - NYC
law requires the State Air Resources Board, in consultation with the Assembly Policies: Air Quality- LOCC -Watch
Bureau of Automotive Repair and a specified review committee, to adopt Appropriations Support measures that CASA-Watch
regulations requiring owners or operators of heavy-duty diesel motor Committee and will be maintain and enhance local ACWA-Watch
vehicles to perform regular inspections of their vehicles for excessive heard August 21. decision-making authority, CSDA-Watch
emissions of smoke. Current law requires the state board, in consultation where appropriate, in the
with the State Energy Resources Conservation and Development development and
Commission, to adopt regulations requiring heavy-duty diesel motor implementation of air quality
vehicles to use emission control equipment and alternative fuels. This bill attainment strategies
would require the state board, in consultation with the bureau and other
specified entities, to implement a pilot program that develops and
demonstrates technologies that show potential for readily bringing heavy-
duty vehicles into an inspection and maintenance program.
OCSD
State
Bills of Interest
MIAUTHOR SUMMA LATEST ACTION OCSD LEGISLATIVE PLAN OTHER
W Ml-. POSITION LfiMLDnQ1T1QWM9__
SB 332 Hertzberg [D] Wastewater treatment: recycled water. Would declare, except in Two Year Bill Watch State Legislation: Work with ACCOC - NYC
compliance with the bill's provisions, that the discharge of treated legislators who introduced LOCC - Oppose
wastewater from ocean outfalls is a waste and unreasonable use of legislation such as SB 163 CASA- Oppose
water. The bill would require each wastewater treatment facility that (Hertzberg, 2015) in order to ACWA- NYC
discharges through an ocean outfall and affiliated water suppliers to ensure that no unrealistic CSDA- Oppose
reduce the facility's annual flow as compared to the average annual regulations are placed on
wastewater discharge baseline volume, as prescribed, by at least 50% wastewater treatment
on or before January 1, 2030, and by at least 95% on or before January facilities, including OCSD
1, 2040. The bill would subject the owner or operator of a wastewater
treatment facility, as well as the affiliated water suppliers, to a civil
penalty of$2,000 per acre-foot of water above the required reduction in
overall volume discharge for the failure to meet these deadlines.
SB 457 Hueso [D] Biomethane: gas corporations Under existing law, the Public Utilities Currently on the Watch Legislative and Regulatory ACCOC - NYC
Commission has regulatory authority over public utilities, including gas Assembly Floor Polciies: Biosolids and LOCC -Watch
corporations. Existing law authorizes the commission to fix the rates and Biogas -Support CASA- Refer to
charges for every public utility and requires that those rates and charges streamlined legislation, Committee
be just and reasonable. Existing law requires the commission to adopt regulations and policies that ACWA- NYC
policies and programs that promote the in-state production and encourage the procurement CSDA- NYC
distribution of biomethane, as defined, and that facilitate the of biogas, biosolids, and
development of a variety of sources of in-state biomethane. This bill compost.
would require the Public Utilites Commission to extend the program until
December 31, 2026. This bill contains other related provisions and other
existing laws.
SB 667 Hueso [D] Greenhouse gases: recycling infrastructure and facilities. Would Currently in the Watch Legislative and Regulatory ACCOC - NYC
require the Department of Resources Recycling and Recovery to Assembly Polciies: Biosolids and LOCC - Support
develop, on or before January 1, 2021, and would authorize the Appropriations Biogas - Support the CASA- Support
department to amend, a 5-year investment strategy to drive innovation Committee and will be promotion and funding of ACWA- NYC
and support technological development and infrastructure, in order to heard August 21. local pilot programs, studies, CSDA- NYC
meet specified organic waste reduction and recycling targets, as and research for the
provided. The bill would require, on or before June 1, 2021, the beneficial use of biosolids.
department, in coordination with the Treasurer, to develop financial
incentive mechanisms, including, but not limited to, loans and incentive
payments, to fund organic waste diversion and recycling infrastructure.
OCSD
State
Bills of Interest
SB 732 Allen [D] Transactions and use tax. Current law establishes the South Coast Air Two Year Bill Watch Legislative and Regulatory ACCOC - NYC
Quality Management District vested with the authority to regulate air Polciies: Air Quality- LOCC -Watch
emissions from stationary sources located in the South Coast Air Basin Support air quality CASA- NYC
and establishes a district board to govern the district. This bill would legislations, regulations, ACWA- NYC
authorize the south coast district board to impose a transactions and use rules, and policies that CSDA- No
tax within the boundaries of the south coast district, as specified, with the emphasize the use of position
moneys generated from the transactions and use tax to be used to advanced technologies and
supplement existing revenues being used for south coast district promote greater flexibility and
purposes, as specified. financial incentives to reduce
air emission.
Legend:
ACC-OC -Association of California Cities, Orange County
LOCC - League of California Cities
NYC- Not Yet Considered
CASA- California Association of Sanitation Agencies
ACWA-Association of California Water Agencies
CSDA- California Special Districts Association
OCSD's Grant and Loan Funding Tracker 2018-2019
Name of Grant/Loan Synopsis of Grant/Loan Amount of Grant/Loan Amount Applying Y/N Project/Pro ram Reason Match Deadline Category Rcvd Grant/
Applying for j g g rY Financing Y/N
IN STATE
$1.4 billion from the Cap and Trade program(Greenhouse $25 million-Waste Diversion Projects. It is uncertain how much funding will
Cap and Trade Funding Gas Reduction Fund)was was appropriated in the Specifics TBD TBD TBD TBD be available for the District's projects, TBD Unknown at this time Energy/Recycling TBD
adopted 2019-2020 budget. or what the funding will be used for.
The Proposition 1 IRWM Grant Program,administered by TPA and OCSD are monitoring the
DW R,provides funding for projects that help meet the grant program development from the
long term water needs of the state,including: Santa Ana Watershed Project
Integrated Regional Water
Authority(SAWPA).The solicitation Management(IRWM)Grant Program Assisting water infrastructure systems adapt to climate NA NA TBD(Round 2) NA for bids was announced by SAW PA 50% NA. for Round 2 Will return in 2021 Water No
change; and staff determined that an
Providing incentives throughout each watershed to application for funding was not
collaborate in managing the region's water resources and warranted due to a lack of eligible
setting regional priorities for water infrastructure and competitive projects.
FEDERAL
The Title XVI Water Reclamation and Reuse Projects
funding opportunity allows for sponsors of water
reclamation and reuse projects that are congressionally Reclamation is making up to$20 million The Sanitation District is applying for
authorized or are eligible under section 4009(c)of the Title 16 will pay up to
The Water Infrastructure WIIN Act to request cost-shared funding for planning, available for those projects authorized under $550,000 Yes Final Expansion of GWRS Headworks Segregation project that 25 percent of the 7/2 712 0 1 8 Water/Infrastructure No
Improvements Act(WIIN) design and/or construction of those Projects.Water the WIIN Act and$34 million for the Headworks(P2-122) will help to bring more water to the available money
reclamation and reuse projects provide improved congressionally authorized Title XVI projects. GWRS.
efficiency,flexibility during water shortages and
diversifies the water supply.
The Title XVI Water Reclamation and Reuse Projects
funding opportunity allows for sponsors of water
reclamation and reuse projects that are congressionally The Sanitation District applied for
authorized or are eligible under section 4009(c)of the Reclamation is making up to$20 million Title 16 will pay up to
The Water Infrastructure Final Expansion WIIN Act to request cost-shared funding for planning, available for those projects authorized under $3 million Yes 2 GWRS Headworks Segregation project that
25 percent of the 6/28/2019 Water/Infrastructure TBD
Improvements Act(WIIN) design and/or construction of those Projects.Water the WIIN Act. Headworks(P -122) will help to bring more water to the available money
reclamation and reuse projects provide improved GWRS.
efficiency,flexibility during water shortages and
diversifies the water supply.
Stormwater and CSO Grant Program USEPA is authorized to provide grants assistance of Funding cost-share is not identified in the law TBD TBD.We will monitor for possible TBD Funding must be appropriated as part TBD TBD Water/Infrastructure TBD
public agencies to control stormwater flows and CSO's funding opportunities/A of current FY 2019 budget impasse
Updated 6/21/2019
OCSD's Grant and Loan Funding Tracker 2018-2019
Name of Grant/Loan Synopsis of Grant/Loan Amount of Grant/Loan Amount Applying Y/N Project/Pro ram Reason Match Deadline Category Rcvd Grant/
Applying for j g g rY Financing Y/N
A minimum of$20 million to as much as$100 Project Funding Opportunity:
million based upon prior years'budgets. Energy production to reduce
costs of USBR could receive as much as$130 million recycled water through
innovative technologies like
The Department of Energy(DOE),
The DOE's Office of Energy Efficiency is likely to in support of the WaterSmart(due to We will review the possible funding
We will monitor for possible Aquacritox,Innovative water
USBR and USEPA continue to be funded by Congress to support such increased funding under WIIN)during the TBD TBD.funding opportunities monitoring technology that can opportunity to determine if it is a fit for N/A TBD Energy TBD
efforts as biogas,biosolids and green energy. next several years.USBR will issue the Sanitation District.
solicitations for innovative approaches to produce efficient real time
managing water and water treatment through monitoring and data analysis,
technology and processes. Improvogasements.
Management and Use
mprovements.
Other
The primary focus of the Community Partnering
Program(CPP)is sponsorship of water
conservation and water-use efficiency
programs and activities.Applications must be
submitted 30 days prior to the start date of the
event or program.
Community Partnering Program Grant Metropolitan Water District Requests for a maximum$2,000 award will be $2,000 Yes For Plant No.1 Signage Applied Match ongoing Education Yes
reviewed year-round and funds are awarded
throughout the year.Funds are limited,
however,and may be depleted prior to the
ending of this fiscal year(June 30).
The California Government Operations Agency
(GovOps)will award$500,000 in grants as part
of the statewide California Mass Timber
Building Competition.Grants will be awarded to
selected proponent teams presenting viable
Mass Timber Competition CalGovOps and repeatable mass timber solutions for $40,000 Yes Headquarters Building Applied No 03/18/19 Environment Yes
commercial and multi-family projects in
California.The competition is being hosted by
GovOps and administered by WoodWorks—
Wood Products Council.
Updated 6/21/2019
9/9/2019
O�JN_xV SANIrgT�QY
= A
cc
c
o �
•
• ' ' Presented By: 9°�
F oa
• cl�N� THE ENV\Q
Eric Sapirstein
ENS Resources, Inc.
September g, zosg
Key legislative activities
INFRASTRUCTURE: HOUSE REAUTHORIZATION
• $i7 Billion over five years
• Set Asides:Green Infrastructure,Subsidized Assistance,and Alternative Water Supply Projects
• Worker Development Programs
• House Committee Mark-up Unclear
■ ■ ■ LEGISLATION H.R. 1.764
• House Committee Staff Offer Options for Compromise Approach
• Strong Support from CASA Mayors,Counties,NACWA,WEF,ACWA and WateReuse
•A: National Defense Authorization
• House and Senate Working on Global PFAS Agreement
• Deadline for Compromise Outline Mid-September
• Focus on Superfund Designation and Monitoring/Treatment Standards
FUNDING OF • • AGENCY BUDGETS
2
1
9/9/2019
Questions *IF
s
3
2
TOWNSEND
PUBLIC AFFAIRS
EST TPA 1998
• y�
WWW.TOWNSENDPA.COM • ,
SACRAMENTO•WASHINGTON,DC
NORTHERN CALIFORNIA•CENTRAL CALIFORNIA•SOUTHERN CALIFORNIA • , '
Agenda -
Legislative Schedule and Deadlines
Potential 2020 Water Bond
Priority Legislation
Priority Legislation Continued
Slide 2
9/9/2019
Legislative • and
Deadlines
Legislative Schedule and Deadlines
• August 30 was the last day for bills to be heard in fiscal committees
— Over 600 bills were heard in just a few hours
• Approximately 810 bills are still eligible for consideration in 2019
• The Legislature has moved to Floor session only
• September 13 is the last day to pass bills
SACR), WENTO
nn
4
2
9/9/2019
Hot Topics - •
The following topics are expected to be discussed at length in the final
week of the legislative session:
• Housing legislation including rent control
• Labor classification
• Vaccine exemptions
• Various local control measures
5
Potential 2020 Water Bond
6
3
9/9/2019
' : 2020 : • •
• Asm. Eddie Garcia (D — Coachella) has amended his AB 352 to
become a 2020 Wildfire/Climate Change/Water Bond
• Currently, the bill authorizes $3.9 billion
in GO bonds
• Dollar amounts for top-line categories include:
— $1.25 billion for natural disaster/climate
change resilience
— $925 million for safe drinking water BALLOT
— $725 million for parks BOX
— $475 million for fish and wildlife
— $100 million for agriculture
— $215 million for coastal protection
— $230 million for climate education
7
Priority Legislation
8
4
9/9/2019
C 756
• AB 756 authorizes the State Water Board to order public water
systems to monitor for PFAS substances
• Requires public water systems to
issue notifications for detection and
PFUS PFOA PFHzS
exceedance of PFAS authorized levels
• Amendments late in the process improved upon a possible
mandate for water systems
• Bill has been signed into law by Governor Newson
imm oill,
i • • • Recycling Infrastructure
• Would authorize CalRecycle to create incentives and financing
mechanisms for the development of organic waste
infrastructure
• Largely seen as a path forward to compliance with short-lived
climate pollutants for jurisdictions (SB 1383, Lara)
• OCSD supported the bill in May 2019
• Bill was held in the Assembly Appropriations Committee's
Suspense File and is now a two-year bill
10
5
9/9/2019
Priority - • •
• - •
Mi
11
• Legislation
AB 292(Quirk) Changes the definition of potable reuse of recycled water by Support Currently in the Senate Inactive File
including raw water augmentation,treated drinking water
augmentation,groundwater augmentation,or reservoir water
augmentation within the definition of recycled water and deleting
direct and indirect potable reuse.
AS 405(Rubio) Would exempt chemicals used by a city,county,public utility,and Support Held in the Assembly Appropriations
sanitation district to treat water,recycled water,or wastewater Committee
from sales tax
AB 1184(Gloria) Would require all public agencies to maintain and archive all Oppose Currently on the Senate Floor
transmitted electronic communications for two years minimum.
AB 1486(Ting) Expands surplus land requirements for both the state and local Work with Currently on the Senate Floor.
agencies.Requires that agencies offer surplus land to affordable Author
housing developers and others when they determine it will be sold.
AB 1672(Bloom) Would prohibit manufacturers from labeling wipes as"flushable" Support Held in the Assembly Appropriations
unless they meet objective standards Committee
SB 200(Monning) Provides$130 million per year for safe drinking water projects Watch Signed into law.
from the Greenhouse Gas Reduction Fund.
SB 332(Hertzberg) Requires each wastewater treatment facility that discharges Work with Held in the Senate Appropriations
through an ocean outtall and affiliated water suppliers to reduce Author Committee
the facility's annual flow as compared to the average annual
wastewater discharge baseline volume by at least 50%on or
before January 1,2030,and by at least 95%on or before January
1,2040.
OM
6
9/9/2019
oJHtN SANI Iq tiO
� 2
TOWNSEND
PUBLIC AFFAIRS
HT TPA 1998
Thank You
Cori Williams Eric O'Donnell
Southern California Senior Director SeniorAssociate
CWilliams@townsendpa.com EODonnell@townsendpa.com
www.townsendpa.com www.townsendoa.com
13
7
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
STEERING COMMITTEE (714)5937433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-600 Agenda Date: 9/25/2019 Agenda Item No: 16.
FROM: James D. Herberg, General Manager
SUBJECT:
GENERAL MANAGER'S FISCAL YEAR 2019-2020 WORK PLAN
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Receive and file the General Manager's Fiscal Year 2019-2020 Work Plan.
BACKGROUND
Each year, the General Manager prepares a work plan of activities supporting the Orange County
Sanitation District's strategic goals and initiatives to be accomplished during the fiscal year. The draft
work plan was submitted to the Steering Committee for review and input from the Directors in August.
This final work plan is being submitted to the Steering Committee and Board of Directors for
approval.
RELEVANT STANDARDS
• Sustain 1, 5, 20-year planning horizons
• 24/7/365 treatment plant reliability
• Negotiate fair and equitable labor agreements
• Commitment to safety & reducing risk in all operations
• Meet volume and water quality needs for the GWRS
• Maintain a culture of improving efficiency to reduce the cost to provide the current service level
or standard
PRIOR COMMITTEE/BOARD ACTIONS
August 2019 - Draft work plan was reviewed with the Steering Committee and Board of Directors.
ADDITIONAL INFORMATION
The General Manager's work plan includes goals for the 2019-2020 fiscal year. The work plan has
five areas of focus which include: Safety and Security, Succession Planning, Resource Recovery,
Reliability, and Operational Optimization.
Orange County Sanitation District Page 1 of 2 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-600 Agenda Date: 9/25/2019 Agenda Item No: 16.
FINANCIAL CONSIDERATIONS
All items included in the General Manager's work plan are budgeted in the FY 2019-2020 Budget.
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• General Manager's Fiscal Year 2019-2020 Work Plan
Orange County Sanitation District Page 2 of 2 Printed on 9/19/2019
powered by LegistarTM
"Y SAH,rAroy ORANGE COUNTY SANITATION DISTRICT
s
9 Memorandum
r/N@ THE ENv\P
September 25, 2019
TO: Chairman and Members of the Board of Directors
FROM: James D. Herberg
General Manager
SUBJECT: General Manager's Fiscal Year 2019-20 Work Plan
I am pleased to present my Fiscal Year 2019-20 work plan. The work plan has nineteen
goals organized under five focus areas including safety and security, succession planning,
resource recovery, reliability, and operational optimization. This work plan was reviewed
with the Steering Committee and Board of Directors on August 28, 2019 and a mid-
year update will be provided in January 2020.
1. Safety and Security
• Emergency Preparedness — Develop and conduct an external emergency
response and recovery drill by June 30, 2020 that tests the Integrated
Emergency Response Plan (IERP).
• Safety Engineering Solutions — Complete six of the remaining eight
Safety Improvement Construction Projects by June 30, 2020.
• Voluntary Protection Plan (VPP) Certification — Apply for the VPP
certification for Plant No. 1 by June 30, 2020.
• Physical Security Plan — Complete the development and implementation of
a Physical Security Plan by June 30, 2020.
• Cyber Security Plan — Complete the development and implementation of a
Cyber Security Plan by June 30, 2020.
2. Succession Planning
• Leadership Development — Provide at least two specialized trainings
tailored to the Supervisory Level and one for the EMT/ Managers by June
30, 2020.
3. Resource Recovery
• Groundwater Replenishment System (GWRS) Final Expansion — Meet the
following milestones to support the final expansion of GWRS:
o Advertise for Construction of Project P2-122, Headworks
Modifications at Plant No. 2 for GWRS Expansion by January 31,
2020.
o Issue Construction Contract Notice to Proceed for Project P2-122,
Headworks Modifications at Plant No. 2 for GWRS Expansion by June
30, 2020.
• Emerging Contaminants — Work with industry, academic, and agency
partners to develop science-based regulations and an adaptive plan by June
30, 2020 to address the potential impact of PFAS to OCSD.
• Food Waste Digestion Pricing Policy— Present a draft policy and pricing plan
to the Board of Directors by June 30, 2020.
4. Reliability
• Asset Management Plan — Develop an Asset Management Plan by
December 31, 2019 that includes an inventory of critical assets for each
process area and the collection system; an evaluation of their condition and
performance; and an implementation plan to maintain, rehabilitate, and
replace these assets to meet the required levels of service at the lowest life
cycle cost and at an acceptable level of risk.
Page 2
• Central Generation Engines — Implement an in-house heavy mechanical
maintenance team and award a contract by December 31, 2019 to overhaul
two Central Generation Engines.
• Pump Station Bypass Exercises— Bypass pump two Pump Stations to prove
emergency readiness and use the exercise to do critical valve and electrical
maintenance at those Pump Stations by June 30, 2020.
5. Operational Optimization
• OCSD Headquarters Building—Advertise for Construction for Headquarters
Complex Site Preparation, Contract No. P1-128C by February 29, 2020.
Obtain City of Fountain Valley approvals for the Headquarters Building by
June 30, 2020.
• Document Management — Complete Records Management and Trusted
System Needs Assessment by November 30, 2019.
• Communications Audit — Complete the audit and provide a report to the
Legislative and Public Affairs Committee by March 30, 2020.
• Capital Project Delivery — Complete a formal design review framework by
June 30, 2020. Complete a framework for regular updates of engineering
policies and procedures, design guidelines, and engineering standards by
June 30, 2020.
• Solids Handling Optimization — Complete commissioning and optimize
performance of new solids handling facilities at each plant by December 31,
2019.
• Strategic Plan — Complete new Strategic Plan for adoption by the Board of
Directors by November 30, 2019.
• Two Year Budget — Complete new two-year budget for adoption by the
Board of Directors on June 24, 2020.
Page 3
oJ��V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
STEERING COMMITTEE (714)5937433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-612 Agenda Date: 9/25/2019 Agenda Item No: 17.
FROM: David Shawver, Board Chairman
SUBJECT:
GENERAL MANAGER'S COMPENSATION AND BENEFITS
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Adopt Resolution No. OCSD 19-12 entitled, "A Resolution of the Board of Directors of the Orange
County Sanitation District approving salary increases and salary range adjustments for the General
Manager for Fiscal Year 2019/2020, Fiscal Year 2020/2021, and Fiscal Year 2021/2022", authorizing
the Board Chair to implement increases consisting of a 3% salary range adjustment and
corresponding salary increase annually and up to a 2.5% merit increase annually based on job
performance as determined by the Board of Directors commencing in the first pay period of July 2019
for Fiscal Year 2019/2020.
BACKGROUND
The General Manager of the Orange County Sanitation District (Sanitation District) is employed on an
At-Will basis and serves at the pleasure of the Board of Directors.
According to Section 6 of the General Manager's At-Will Agreement, the "District's Steering
Committee shall meet with the General Manager in August of each year during the term of this
Agreement to review and evaluate his performance over the prior year. The Steering Committee
shall make its recommendation(s) to the Board concerning adjustment to the compensation and/or
benefits paid or provided to the General Manager, to be effective in July of the year of the review".
The Sanitation District's Board of Directors has taken action in recent years to attract and retain
critical executive- and management-level employees, ensuring compensation and benefits are
competitive with the labor market.
The General Manager's salary market position in 2016 was extremely low when compared to the
Sanitation District's comparison agencies. Salary market position for the Sanitation District's General
Manager was at the 7t" percentile in 2016 compared with the Sanitation District's comparison
agencies. Board actions in the past two (2) years have significantly improved this issue.
Salary increases and benefits package additions in the most recent employment contract have
placed the Sanitation District's General Manager at the 68t" percentile in salary as of July 2019.
Orange County Sanitation District Page 1 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-612 Agenda Date: 9/25/2019 Agenda Item No: 17.
RELEVANT STANDARDS
• Offer competitive compensation and benefits
• Maintain positive employer-employee relations
• Cultivate a highly qualified, well-trained, and diverse workforce
• Comply with OCSD Policy (Policy 6.1 Appraisal of Performance) and the General Manager's
At-Will Employment Agreement
PROBLEM
The General Manager's current salary market position is at the 68th percentile. The Sanitation District
targets the 75th percentile for its overall market position and the General Manager's compensation
currently falls below that mark. Additionally, salary market position for the General Manager could
deteriorate if the salary range were to remain static while comparison agencies provide salary
increases. This could potentially put the Sanitation District at risk for retention of executive staff.
Also, Fiscal Year 2019/2020 increases for the Sanitation District's executive management and
managers are currently under consideration. Salary compaction and internal alignment issues could
arise in the future if the General Manager's salary range were to remain unchanged as other
positions' salaries increase.
PROPOSED SOLUTION
Adopt Resolution No. OCSD 19-12, entitled "A Resolution of the Board of Directors of the Orange
County Sanitation District approving salary increases and salary range adjustments for the General
Manager for Fiscal Year 2019/2020, Fiscal Year 2020/2021, and Fiscal Year 2021/2022".
The proposed salary increases annually for three years consist of a 3% salary range adjustment and
corresponding salary increase and up to a 2.5% merit increase each fiscal year based on job
performance as determined by the Board of Directors. This is projected to move the General
Manager's market position to the 75th percentile in salary by June 2022.
The Sanitation District is committed to maintaining a competitive compensation market position that
attracts and retains top employment talent. It is the Sanitation District's philosophy to compensate
employees competitively and equitably; understanding the relative market position assists with that
determination.
RAMIFICATIONS OF NOT TAKING ACTION
Potential retention issue of highly skilled and experienced executive staff.
PRIOR COMMITTEE/BOARD ACTIONS
June 2019 - Steering Committee conducted the annual performance evaluation of the General
Manager for Fiscal Year 2018/2019 in closed session.
July 2017 - Steering Committee conducted the annual performance evaluation of the General
Orange County Sanitation District Page 2 of 3 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-612 Agenda Date: 9/25/2019 Agenda Item No: 17.
Manager for Fiscal Year 2016/2017 in closed session. Resolution No. OCSD 16-29 included
direction on adjustments to the compensation for Fiscal Year 2017/2018; no further Board action was
needed to implement.
November 2016 - Approved Resolution No. OCSD 16-29, which authorized adjustments to the
General Manager's compensation and benefits for Fiscal Year 2016/2017 and Fiscal Year 2017/2018,
specifically a base building salary increase and a salary range adjustment of 8.0% in July 2016 and a
base building salary increase and a salary range adjustment of 8% in July 2017, respectively.
ADDITIONAL INFORMATION
The agency's accomplishments during the past year include the following:
• Achieving successful negotiation and implementation of eleven agreements with various other
public agencies
• Reaffirming the Sanitation District's AAA credit ratings
• Achieving the service level goal with only one sewer spill in over two years
• Maintaining 100% compliance with its ocean discharge permit over a continuous six-year
period (a first for the Sanitation District)
• Addressing potential air quality permit violations
• Commissioning new dewatering facilities
• Making progress toward Cal OSHA VPP safety program certification
CEQA
N/A
FINANCIAL CONSIDERATIONS
The total salary cost increase is not to exceed $99,340 for the three-year period. Compensation and
benefits costs, including impacts to existing benefits, are not to exceed a total amount of $111,202.
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Resolution No. OCSD 19-12
• General Manager's Current & Proposed Salary Schedule
• General Manager's At-Will Employment Agreement
Orange County Sanitation District Page 3 of 3 Printed on 9/19/2019
powered by LegistarTM
RESOLUTION NO. OCSD 19-12
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT APPROVING
SALARY INCREASES AND SALARY RANGE ADJUSTMENTS
FOR THE GENERAL MANAGER FOR FISCAL YEAR
2019/2020, FISCAL YEAR 2020/2021, AND FISCAL YEAR
2021/2022.
WHEREAS, the General Manager provides organizational leadership, strategic
direction, and District oversight for Orange County Sanitation District (OCSD); and
WHEREAS, the General Manager serves in an at-will employment capacity, which
may be terminated at any time by the Board with or without cause; and
WHEREAS, it is OCSD's philosophy to compensate employee classifications
competitively, which currently can be achieved through alignment with the salary market;
and
WHEREAS, the July 1, 2018, At-Will Agreement with the General Manager
provides that, "District's Steering Committee shall meet with General Manager in August
of each year during the term of this Agreement to review and evaluate his performance
over the prior year. The Steering Committee shall make its recommendation(s) to the
Board concerning adjustment to the compensation and/or benefits paid or provided to
General Manager, to be effective in July of the year of review. After consideration of the
recommendation(s) of the Steering Committee, the Board shall determine and approve
the compensation, including benefits, payable to General Manager, which generally
becomes effective July of the fiscal year of the review"; and
WHEREAS, the Steering Committee commenced its review of the General
Manager's performance in June 2019, finalized its review and made its recommendation
to the Board on September 25, 2019.
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation
District, DOES HEREBY RESOLVE, DECLARE, DETERMINE, AND ORDER:
1. That the At-Will Agreement with the General Manager (Attached hereto as
Exhibit 1) setting forth the terms and conditions of his employment, including
a salary increase in the first pay period of July 2019, consisting of a 3.0%
salary range adjustment and corresponding salary increase and 2.5% merit
increase as determined by the Board of Directors, not to exceed 5.5% total,
is hereby approved to be effective retroactively to the first pay period of July
2019;
2. A salary increase in the first pay period of July 2020, consisting of a 3.0%
OCSD 19-12-1
salary range adjustment and corresponding salary increase and up to 2.5%
merit increase to be determined by the Board of Directors based on job
performance, not to exceed 5.5% total;
3. A salary increase in the first pay period of July 2021, consisting of a 3.0%
salary range adjustment and corresponding salary increase and up to 2.5%
merit increase to be determined by the Board of Directors based on job
performance, not to exceed 5.5% total; AND
4. That the Board Chair, or his designee, is authorized to implement the changes
to salary range and salary items approved herein.
PASSED AND ADOPTED at a regular meeting of the Board of Directors held
September 25, 2019.
David John Shawver
Board Chairman
ATTEST:
Kelly A. Lore, MMC
Clerk of the Board
OCSD 19-12-2
STATE OF CALIFORNIA )
ss
COUNTY OF ORANGE )
I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation
District, do hereby certify that the foregoing Resolution No. OCSD 19-12 was passed and
adopted at a regular meeting of said Board on the 25t" day of September 2019, by the
following vote, to wit:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal
of Orange County Sanitation District this 25t" day of September 2019.
Kelly A. Lore
Clerk of the Board of Directors
Orange County Sanitation District
OCSD 19-12-3
General Manager Salary Schedule
Orange County Sanitation District
Classification and Compensation Plan
Current
GENERAL MANAGER, FY 2018-19
Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5
EM37 Annual $ 255,778 $ 268,861 $ 282,610 $ 297,066 $ 312,250
Monthly $ 21,315 $ 22,405 $ 23,551 $ 24,755 $ 26,021
Hourly $ 122.97 $ 129.26 $ 135.87 $ 142.82 $ 150.12
Proposed Salary Range Adjustment 3.0%
GENERAL MANAGER, Proposed FY 2019-20
Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5
EM37 Annual $ 263,453 $ 276,931 $ 291,096 $ 305,968 $ 321,610
Monthly $ 21,954 $ 23,078 $ 24,258 $ 25,497 $ 26,801
Hourly $ 126.66 $ 133.14 $ 139.95 $ 147.10 $ 154.62
Proposed Salary Range Adjustment 3.0%
GENERAL MANAGER, Proposed FY 2020-21
Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5
EM37 Annual $ 271,357 $ 285,230 $ 299,832 $ 315,141 $ 331,261
Monthly $ 22,613 $ 23,769 $ 24,986 $ 26,262 $ 27,605
Hourly $ 130.46 $ 137.13 $ 144.15 $ 151.51 $ 159.26
Proposed Salary Range Adjustment 3.0%
GENERAL MANAGER, Proposed FY 2021-22
Pay Grade Step 1 Step 2 Step 3 Step 4 Step 5
EM37 Annual $ 279,490 $ 293,779 $ 308,818 $ 324,605 $ 341,203
Monthly $ 23,291 $ 24,482 $ 25,735 $ 27,050 $ 28,434
Hourly $ 134.37 $ 141.24 $ 148.47 $ 156.06 $ 164.04
oOJNSV SANITgT O2
a
A
ti
O
FpT,N�E EN�\P�
AT-WILL EMPLOYMENT AGREEMENT
James D. Herberg
General Manager
ORANGE COUNTY SANITATION DISTRICT
THIS AT-WILL EMPLOYMENT AGREEMENT ("Agreement") is entered into, to be
effective the 1st day of July, 2019, by and between:
ORANGE COUNTY SANITATION DISTRICT, hereinafter referred to as
"District";
AND
JAMES D. HERBERG, sometimes hereinafter referred to as "General
Manager"; collectively referred to herein as ("the Parties")
RECITALS
WHEREAS, District desires to continue to employ James D. Herberg ("Mr. Herberg"),
as General Manager of District, pursuant to the terms and conditions as set forth in this
Agreement;and
WHEREAS, Mr. Herberg, by virtue of his education, training and experience, is fully
qualified to fill the position of General Manager and desires to continue to serve the District
as its General Manager, pursuant to the terms and conditions of this Agreement; and
WHEREAS, per Resolution No. 19-XX adopted on September 25, 2019, the District's
Board of Directors has approved and authorized the Board Chair to execute this "At-Will
Employment Agreement"to include a base building salary increase of 5.5% of his current
salary.
WHEREAS, at the beginning of negotiations of a new Employment Agreement, the
parties agreed that any salary changes agreed to would take effect retroactively to the first pay
period of July 2019, which is the first pay period in the current fiscal year.
NOW, THEREFORE, the Parties hereto agree as follows:
Section 1: District hereby continues to employ Mr. Herberg to serve as General Manager
of the Orange County Sanitation District, commencing on the effective date hereof, and continuing
until termination by either Party, as provided in this Agreement.
In that capacity, Mr. Herberg agrees to perform the functions and duties of General
Manager, the administrative head of the District, as prescribed by the laws of the State of
California, and by the rules, regulations, decisions, and directions of the Board of Directors of
District (hereinafter referred to as "Board"). The General Manager's duties may involve
expenditures of time in excess of the regularly established workday or in excess of a forty-h o u r
work week and may also include time outside normal office hours (including attendance at
Board and Committee meetings). General Manager is classified as an exempt employee under
the Fair Labor Standards Act ("FLSA") and shall not be entitled to any additional compensation
for hours worked in excess of forty in a work week.
Section 2: Mr. Herberg shall be employed in an "at-will" capacity serving at the sole
pleasure of the Board. Either party to this Agreement may terminate the Agreement at any time
for any reason with or without cause, and without hearing, upon 30 days' notice to the other
party. Mr. Herberg is advised and acknowledges that he has none of the termination rights of a
Regular employee of the District. Except as expressly provided herein, and as a condition of
employment, Mr. Herberg knowingly, willingly and voluntarily gives up, waives, and disclaims
any and all rights he may have, express or implied,to any notice and/or hearing before or after
termination, and/or to any continued employment with the District after termination.
As an "at-will" employee, Mr. Herberg understands that he may be subject to termination
with or without cause at the sole discretion of the Board, notwithstanding that the other
provisions of the District's Personnel Policies and Procedures Manual (hereinafter referred to as
"Manual")apply to Mr. Herberg. If the District terminates employment without cause, Mr. Herberg shall
be given a thirty (30) day Notice of Termination and severance pay in an amount equal to six (6)
months of his then current annual base salary upon Mr. Herberg's execution of a valid written release
of legal claims.
If the District terminates this Agreement(thereby terminating Mr. Herberg's employment)without
cause, and Mr. Herberg executes a valid written release of legal claims, the severance pay is
considered a cash settlement related to the termination of Mr. Herberg and waiver of legal claims and
shall be fully reimbursed to the District by Mr. Herberg if Mr. Herberg is convicted of a crime involving
an abuse of his office or position. Abuse of office or position shall have the meaning set forth in
Government Code 53243.4, as may be amended, of either(1) an abuse of public authority, including,
but not limited to, waste, fraud and violation of the law under color of authority, or (2) a crime against
public justice, including, but, not limited to, a crime described in Title 7 (commencing with Section 92
of Part 1 of the Penal Code). Mr. Herberg shall reimburse such severance pay to the District no later
than six (6) months after such conviction. If Mr. Herberg terminates his employment with 30 days'
notice, the Board shall have the right to accept his resignation effective the date notice is given. Such
decision to accept his resignation earlier shall not be considered a termination without cause and shall
not entitle Mr. Herberg to receive the severance pay noted above.
Section 3: The term of this Agreement shall commence on the effective date above and
continue for an indefinite duration, until terminated by either Party pursuant to Section 2 above, or
unless terminated or amended as provided herein.
Section 4: As compensation for the services to be performed hereunder, upon the effective
date of this Agreement, District agrees to pay General Manager an annual base salary for services
rendered of three hundred six thousand one hundred ninety-six dollars ($306,196), subject to all
applicable deductions and withholdings of any and all sums required by then current state, federal or
local law, along with deductions of applicable sums the General Manager is obligated to pay because
of participation in plans and programs described in this Agreement, and paid biweekly in accordance
with the District's established accounting and payroll practices at the same time and in the same
manner as other employees of the District. No increase in salary may exceed the compensation
permitted by the applicable salary range for the classification established by duly adopted Resolution
of the Board.
For Years Two and Three of the employment contract, compensation will adjust as follows:
1. A salary increase in the first pay period of July 2020, consisting of a 3.0% salary range
adjustment and corresponding salary increase and up to 2.5% merit increase to be
determined by the Board of Directors based on job performance, not to exceed 5.5%total;
2. A salary increase in the first pay period of July 2021, consisting of a 3.0% salary range
adjustment and corresponding salary increase and up to 2.5% merit increase to be
determined by the Board of Directors based on job performance, not to exceed 5.5%total.
Section 5: For the period of this Agreement, District shall provide Mr. Herberg with a fixed
benefit package that includes the following:
• Personal Leave — accrued based on years of service for all paid hours, including
hours actually worked and hours in a paid-leave payroll status, on a biweekly
basis in accordance with the Manual. Personal leave accruals shall not exceed
four hundred forty (440) hours as of December 31 of each year. Any hours in
excess of said limit, will be paid to Mr. Herberg in January in an amount equal to
the hourly rate of compensation.
• Administrative Leave - 40 hours per fiscal year, granted and not eligible for
annual cash out.
• Investment Incentive Salary (IIS) - 6% of base salary applied on a biweekly fiscal
year basis, and a flat amount of one thousand two hundred fifty dollars ($1,250)
annually.
• Deferred Compensation - OCSD-paid annual allocation for 2019, 2020, and
2021 of $11 ,000 allocated on a biweekly calendar year basis.
• Car Allowance — OCSD-paid annual allocation of$8,400.
• Added Medical Allowance—OCSD-paid annual allocation for 2019, 2020, and
2021 of six thousand dollars ($6,000).
Mr. Herberg's benefit package also shall include benefits consistent with the Manual for:
holiday pay; medical, dental, vision and life insurance at three times base salary; long-term and
short-term disability insurance; and employee assistance program. Additionally, Mr. Herberg's
benefit package shall include executive disability insurance benefits, consistent with those
provided to OCSD managers.
These benefits shall remain in full force and effect unless and until replaced by an amendment
to this Agreement,signed by Mr. Herberg and approved by the Board,which amendment shall include
the effective date thereof.
Section 6: District's Steering Committee shall meet with General Manager in August of
each year during the term of this Agreement to review and evaluate his performance over the
prior year.The Steering Committee shall make its recommendation(s) to the Board concerning
adjustment to the compensation and/or benefits paid or provided to General Manager, to be
effective in July of the year of review. After consideration of the recommendation(s) of the
Steering Committee, the Board shall determine and approve the compensation, including
benefits, payable to General Manager, which generally becomes effective July of the fiscal year
of the review. Failure of the District to review and evaluate the performance of the General
Manager pursuant to this section shall not affect the right of the District to terminate the General
Manager's employment and shall not be considered a breach of this Agreement.
Section 7: Mr. Herberg shall be a Participant Member in the Orange County Employees
Retirement System ("OCERS"). District shall pay the required employer's contribution and 0%
of Mr. Herberg's required contribution towards membership in OCERS.
Section 8: District shall reimburse General Manager for all expenses paid by him and
incurred for non-personal,job-related District business that are reasonably necessary to the
General Manager's service to the District. The District agrees to either pay such expenses in
advance or to reimburse the expenses, so long as the expenses are incurred and submitted
according to the criteria established by District's budget and/or normal expense reimbursement
procedures pursuant to applicable policy Resolutions. To be eligible for reimbursement, all
expenses must be supported by documentation meeting the District's policies and requirements
and must be submitted within time limits established by the District. Such reimbursement shall
not be considered a benefit.
Section : During the period of this Agreement, it is agreed that General Manager shall
devote his fulltime, skills, labor and attention to said employment. At no time may General
Manager undertake outside activities consisting of consultant work, speaking engagements,
writing, lecturing, or other similar professional activities for money or other consideration without
prior approval of District's Steering Committee. However, the expenditure of reasonable amount
of time for educational, charitable, or professional activities shall not be deemed a breach of
this Agreement if those activities do not conflict or materially interfere with the services
required under this Agreement, and shall not require the prior written consent of the Steering
Committee.
This Agreement shall not be interpreted to prohibit General Manager from making
passive personal investments or conducting private business affairs, provided those activities
are not deemed to be a conflict of interest by state law nor do they conflict or materially interfere
with the services required underthis Agreement.
Section 10: The Board has the sole discretion to determine whether the District shall pay
General Manager pending an investigation into any alleged misconduct by General Manager. In
the event that the District's Board determines, in its sole discretion, that it is inthe best interest
of the District for General Manager to be placed on paid administrative leave pending such an
investigation, General Manager shall fully reimburse any salary provided for that purpose if the
misconduct for which the General Manager was under investigation results in the General
Manager being convicted of a crime involving an abuse of his office or position as defined in
Section 2 of this Agreement. General Manager shall reimburse such salary to the District no
later than six months after such conviction.
Section 11: In the event that the District provides funds for the legal criminal defense of
General Manager, General Manager shall fully reimburse said funds to the District if the
General Manager is convicted of a crime involving an abuse of his/her office or position as
defined in Section 2 of this Agreement. General Manager shall reimburse such criminal legal
defense fees to the District no later than six months after such conviction.
Section 12: The terms and conditions of employment for General Manager, including
other employment benefits for the General Manager that are not specifically provided for in this
Agreement, shall be governed by the Manual, to the extent that amendments to the Manual
made after the effective date of this Agreement are not inconsistent with the provisions of this
Agreement. In the event of any such inconsistency or conflict, the provisions of this Agreement
shall govern.
Section 13: This Agreement supersedes any and all other prior agreements, either
oral or in writing, between the Parties hereto with respect to the employment of Mr. Herberg by
District, and contains all of the covenants and agreements between the Parties with respect to
that employment in any manner whatsoever. Each Party to this Agreement acknowledges that
no representation, inducement, promise, or agreement, orally or otherwise, has been made by
any Party, or anyone acting on behalf of any Party, which is not embodied herein, and that no
other agreement, statement, or promise not contained in this Agreement or Employment shall
be valid or binding on either Party.
Section 14: Any notices to be given hereunder by either Party to the other shall be in
writing and may be transmitted by personal delivery, or by mail, registered or certified, postage
prepaid, with return receipt requested. Mailed notices shall be addressed to the Parties at the
addresses maintained in the personnel records of District, but each Party may change that
address by written notice in accordance with this Section. Notices delivered personally shall be
deemed communicated as of the date of actual receipt; mailed notices shall be deemed
communicated as of the date of mailing.
Section 15: Any modifications of this Agreement will be effective only if set forth in
writing and signed by the Parties
Section 16: The failure of either Party to insist on strict compliance with any of the
terms,covenants, or conditions of this Agreement by the other Party, shall not be deemed a
waiver of that term, covenant,or condition, nor shall any waiver or relinquishment of any right or
power at any one time or times be deemed a waiver or relinquishment of that right or power for
all or any other times.
Section 17: If any provision of this Agreement is held by a court of competent jurisdiction
to be invalid, void or unenforceable, the remaining provisions shall nevertheless continue in
full force without being impaired or invalidated in any way
Section 18: This Agreement shall be governed by and construed in accordance with
the laws of the State of California and all applicable ordinances, policies and resolutions.
Section 19: General Manager acknowledges that he has had the opportunity and has
conducted an independent review of the financial and legal effects of th s Agreement. General
Manager acknowledges that he has made an independent judgment upon the financial and
legal effects of the Agreement and has not relied upon representation of the District, its elected
or appointed officers and officials, agents or employees other than those expressly set forth in
this Agreement. General Manager acknowledges that he has been advised to obtain, and has
availed himself of, legal advice with respect to the terms and provisions of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this At-Will Employment
Agreement as follows
"DISTRICT"
ORANGE COUNTY SANITATION DISTRICT
"GENERAL MANAGER"
By:
James D. Herberg Date
APPROVED AS TO FORM: "CHAIR, BOARD OF DIRECTORS"
BRADLEY R. HOGIN
GENERAL COUNSEL
By:
Bradley R. Hogin David John Shawver Date
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
STEERING COMMITTEE (714)5937433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-614 Agenda Date: 9/25/2019 Agenda Item No: 18.
FROM: James D. Herberg, General Manager
Originator: Celia Chandler, Director of Human Resources
SUBJECT:
EXECUTIVE MANAGEMENT TEAM COMPENSATION AND BENEFITS AND MANAGER GROUP
COMPENSATION AND BENEFITS
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Adopt Resolution No. OCSD 19-13 entitled, "A Resolution of the Board of Directors of the
Orange County Sanitation District approving salary increases, salary range adjustments, and a
minor increase to 457(b) matching contributions for At-Will Executive Management Team
employees for Fiscal Year 2019/2020, Fiscal Year 2020/2021, and Fiscal Year 2021/2022",
authorizing the General Manager to implement increases consisting of a 3% salary range
adjustment annually and corresponding salary increases and up to a 5% merit increase
annually based on job performance as determined by the General Manager, not to exceed
Step 5 of the corresponding salary range, commencing in the first pay period of July 2019 for
Fiscal Year 2019/2020.
B. Adopt Resolution No. OCSD 19-14 entitled, "A Resolution of the Board of Directors of the
Orange County Sanitation District approving salary increases, salary range adjustments, and a
minor increase to 457(b) matching contributions for unrepresented management employees
for Fiscal Year 2019/2020, Fiscal Year 2020/2021, and Fiscal Year 2021/2022", authorizing the
General Manager to implement increases consisting of a 3% salary range adjustment annually
and corresponding salary increases and up to a 5% merit increase annually based on job
performance as determined by the General Manager, not to exceed Step 5 of the
corresponding salary range, commencing in the first pay period of July 2019 for Fiscal Year
2019/2020.
BACKGROUND
Executive Management Team Group
There are five (5) Executive Management Team (EMT) employees who provide executive leadership,
strategic direction, and department oversight for the Orange County Sanitation District (Sanitation
District). EMT employees serve in at-will employment status, which may be terminated at any time,
with or without cause, with no liability to the Sanitation District.
Orange County Sanitation District Page 1 of 6 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-614 Agenda Date: 9/25/2019 Agenda Item No: 18.
Currently, the EMT's salary market position is at the 681" percentile based on July 2019 data.
The General Manager is recommending salary increases annually for three years that consist of a
3% salary range adjustment and corresponding salary increases and up to a 5% merit increase each
fiscal year based on individual job performance, not to exceed Step 5 of the corresponding salary
range, as determined by the General Manager.
Additionally, the General Manager is recommending an increase in the matching 457(b) contribution
from up to $200 a month to up to $300 a month for Executive Management Team members who do
not receive Investment Incentive Salary (IIS) or are assigned to the classic open or PEPRA pension
plans.
In 2016, the Board authorized the General Manager to administer the Board-approved EMT pay plan
through a pay-for-performance system with pay range steps. The pay-for-performance system
allows for merit increases to be paid only to EMT employees who meet specific goals assigned by
the General Manager related to his District Work Plan and departmental initiatives.
Pursuant to the understanding with the EMT members at the beginning of discussions, the salary
changes and salary range adjustments would take effect the first pay period in July of the current
fiscal year, 2019.
Manager Group
There are fourteen (14) employees in nine (9) manager classifications at the Sanitation District who
oversee staff within a particular division and align performance with the goals of the agency. In
recent years, the Sanitation District has reduced the number of managers, resulting in significant cost
savings and increased efficiencies, and broader scopes of responsibilities. Managers are not
represented by a bargaining unit and represent themselves as a group in discussions with the
General Manager regarding wages, benefits, and other conditions of employment.
Currently, the Manager Group's salary market position is at the 73rd percentile based on July 2019
data.
The General Manager is recommending salary increases annually for three years that consist of a
3% salary range adjustment and corresponding salary increases and up to a 5% merit increase each
fiscal year, not to exceed Step 5 of the corresponding salary range, based on individual job
performance as determined by the General Manager.
Additionally, the General Manager is recommending an increase in the matching 457(b) contribution
from up to $200 a month to up to $300 a month for managers who do not receive Investment
Incentive Salary (IIS) or are assigned to the classic open or PEPRA pension plans.
In 2016, the Board authorized the General Manager to administer the Board-approved Manager
Group pay plan through a pay-for-performance system with pay range steps. The pay-for-
performance system allows for merit increases to be paid only to Manager Group employees who
meet specific goals assigned by the General Manager related to his District Work Plan and
departmental initiatives.
Orange County Sanitation District Page 2 of 6 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-614 Agenda Date: 9/25/2019 Agenda Item No: 18.
Pursuant to the understanding with the Manager Group members at the beginning of discussions, the
salary changes and salary range adjustments would take effect the first pay period of July in the
current fiscal year, 2019.
RELEVANT STANDARDS
• Ensure the public's money is wisely spent
• Offer competitive compensation and benefits
• Cultivate a highly qualified, well-trained, and diverse workforce
PROBLEM
Koff & Associates, an independent Human Resources consulting company, recently evaluated
classification and compensation data among the Sanitation District's 17 comparison agencies in a
labor market study to refresh data from the Sanitation District's most recent Classification and
Compensation Study (C&C Study). The results of the July 2019 data refresh indicate that the EMT
and Manager Group salaries at the Sanitation District are positioned near the 75t" percentile targeted
by the Sanitation District. Currently, the EMT are at the 68t" percentile of market, and the Manager
Group is at the 73rd percentile as compared to peers in like positions.
Data indicates that by the year 2022, 80% of EMT employees and 64% of management employees
will be eligible for retirement, making succession planning, retention, and recruitment high priorities at
the Sanitation District. As the Sanitation District looks to promote employees from the supervisory
ranks into Management and EMT positions, these potential internal employees are currently faced
with a decision to continue at the Sanitation District or look outside the organization for higher level
positions that may be more attractive in the market. In addition, if the Sanitation District seeks to
recruit employees from outside the agency to fill potential EMT and management position openings
due to retirement, the Sanitation District should ensure it provides competitive pay compared to the
labor market to support the ability to attract and retain top talent.
PROPOSED SOLUTION
Adopt Resolution No. OCSD 19-13 entitled, "A Resolution of the Board of Directors of the Orange
County Sanitation District approving salary increases, salary range adjustments, and a minor
increase to 457(b) matching contributions for At-Will Executive Management Team employees for
Fiscal Year 2019/2020, Fiscal Year 2020/2021, and Fiscal Year 2021/2022", and Resolution No.
OCSD 19-14 entitled, "A Resolution of the Board of Directors of the Orange County Sanitation District
approving salary increases, salary range adjustments, and a minor increase to 457(b) matching
contributions for unrepresented management employees for Fiscal Year 2019/2020, Fiscal Year
2020/2021, and Fiscal Year 2021/2022".
Based on prior Board authorization, the General Manager entered into discussions with the EMT and
Manager Group employees, which resulted in the proposed 3% salary range adjustments and
corresponding salary increases annually, up to a 5% merit increase each fiscal year based on
individual job performance as determined by the General Manager, and a minor increase in 457(b)
matching contributions.
Orange County Sanitation District Page 3 of 6 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-614 Agenda Date: 9/25/2019 Agenda Item No: 18.
RAMIFICATIONS OF NOT TAKING ACTION
Risks may include losing top talent and of not being able to attract top talent due to decline in salary
market position, not maintaining the Sanitation District's targeted 75th percentile in salary market
position, and impacting internal alignment across employee groups, potentially causing compaction
issues between unrepresented groups and represented groups.
PRIOR COMMITTEE/BOARD ACTIONS
November 2016 - Approved Resolution No. OCSD 16-27 and Resolution No. OCSD 16-28, which
established a pay-for-performance compensation system with pay range steps for Executive
Management and Manager Groups, respectively. Also, the Resolutions authorized the General
Manager to administer the Board-approved Executive Management Team and Manager pay plans.
ADDITIONAL INFORMATION
Executive Management Team
Executive Management Team members are employed on an At-Will basis and serve at the pleasure
of the General Manager. The General Manager is authorized, per the Board's Personnel Policies and
Procedures, to periodically adjust the rate of compensation for Executive Management Team
members who have signed At-Will agreements so long as no adjustment exceeds the compensation
permitted by the applicable salary range.
The five (5) At-Will employees of the Sanitation District's EMT are relied upon heavily to provide
leadership, strategic direction, and department oversight at the Sanitation District. These individuals
serve in key leadership positions that are critical to the success of the agency.
Executive Management Team members hold the following classifications:
Executive Management Team Classifications
Assistant General Manager & Director of Operations and Maintenance
Assistant General Manager & Director of Finance and Administrative Services
Director of Engineering
Director of Environmental Services
Director of Human Resources
The Sanitation District is committed to maintaining a competitive compensation market position that
attracts and retains top employment talent. It is the Sanitation District's philosophy to compensate
employees competitively and equitably; understanding the relative market position assists in that
determination.
The comprehensive District-wide C&C Study completed by Koff & Associates in 2016 revealed that
EMT salaries for all classifications were significantly below the 751h percentile. Over the previous five
(5) years, the group's aggregate market position had declined from the 601h percentile in 2011 to the
33rd percentile in 2016.
Orange County Sanitation District Page 4 of 6 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-614 Agenda Date: 9/25/2019 Agenda Item No: 18.
Salary structure changes and salary range adjustments approved by the Board in 2017 and 2018
accomplished the goal of bringing the Sanitation District's EMT salary ranges in line with the market's
75t" percentile (with the top of the range being at the 75t" percentile) by 2019. The current proposed
three-year salary range adjustments are designed to keep pace with comparison agency increases
and thereby maintain the Sanitation District's current market position.
The ability of employees on the EMT to move through their respective pay ranges is based on their
ability to meet the Sanitation District's goals in a pay-for-performance pay system.
Manager Group
The nine (9) classifications that comprise the Sanitation District's Manager Group are relied upon
heavily to provide day-to-day leadership to support strategic direction and division management
oversight at the Sanitation District. These individuals serve in key leadership positions that are
critical to the success of the agency.
Manager Group members hold the following classifications:
Manager Group Classifications
Administration Manager
Controller
Engineering Manager (6)
Environmental Lab & Ocean Monitoring Manager
Human Resources & Risk Manager
IT Systems & Operations Manager
Maintenance Manager
Operations Manager
Purchasing & Contracts Manager
The comprehensive District-wide C&C Study completed by Koff & Associates in 2016 revealed that
the Manager Group salaries for all classifications were significantly below the 75t" percentile. The
Manager Group's market position had declined from the 70t" percentile in 2011 to the 55t" percentile
in 2016.
Salary structure changes and salary range adjustments approved by the Board in 2017 and 2018
accomplished the goal to bring the Sanitation District's Manager Group salary ranges in line with the
75th percentile (with the top of the range being at the 75th percentile) by 2019. The current proposed
three-year salary range adjustments are designed to keep pace with comparison agency increases
and thereby maintain the Sanitation District's current market position.
The ability for employees in the Manager Group to move through their respective pay ranges is
based on their ability to meet the Sanitation District's goals in a pay-for-performance pay system.
CEQA
N/A
Orange County Sanitation District Page 5 of 6 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-614 Agenda Date: 9/25/2019 Agenda Item No: 18.
FINANCIAL CONSIDERATIONS
The costs of the salary range adjustment, salary increases, and minor adjustments to benefits are
approximately $920,897 over the three-year term for both EMT and Managers combined.
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Resolution No. OCSD 19-13 (Executive Management Team)
• Current Executive Management Team Pay Table
• Proposed Executive Management Team Pay Tables, July 2019 to June 2022
• Resolution No. OCSD 19-14 (Manager Group)
• Current Manager Group Pay Table
• Proposed Manager Group Pay Tables, July 2019 to June 2022
Orange County Sanitation District Page 6 of 6 Printed on 9/19/2019
powered by LegistarT"
RESOLUTION NO. OCSD 19-13
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT APPROVING SALARY
INCREASES, SALARY RANGE ADJUSTMENTS, AND A MINOR
INCREASE TO 457(B) MATCHING CONTRIBUTIONS FOR AT-WILL
EXECUTIVE MANAGEMENT TEAM EMPLOYEES FOR FISCAL
YEAR 2019/2020, FISCAL YEAR 2020/2021, AND FISCAL YEAR
2021/2022
WHEREAS, there are five (5) executive management team employees at the
Orange County Sanitation District ("OCSD") who provide executive leadership, strategic
direction, and department oversight for OCSD; and
WHEREAS, executive management team employees serve in at-will employment
status, which may be terminated at any time by either the General Manager or an
executive management team employee with or without cause with no liability; and
WHEREAS, in 2016 the Board authorized the General Manager to administer the
Board approved Executive Management pay plan through a pay for performance system
with pay range steps; and
WHEREAS, the General Manager entered into discussions with executive
management employees, which resulted in agreed upon proposed salary increases,
salary range adjustments, performance-based merit increases, and minor benefit
adjustments; and
WHEREAS, the parties agreed that the salary changes would take effect
retroactively to the first pay period in July 2019 and the start of the new fiscal year in
alignment with the other employee unit increases.
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation
District, DOES HEREBY RESOLVE, DETERMINE, AND ORDER:
That the Board of Directors hereby authorizes and approves the following changes to
salaries and benefits for Executive Management Team members, which shall become
effective the first pay period of July 2019:
• A salary increase in the first pay period of July 2019, consisting of a 3.0% salary
range adjustment and corresponding salary increases and up to 5.0% merit
increase as determined by the General Manager, not to exceed 8.0% total and not
to exceed Step 5 of the corresponding pay range, is hereby approved to be
effective retroactively to the first pay period of July 2019;
• A salary increase in the first pay period of July 2020, consisting of a 3.0% salary
range adjustment and corresponding salary increases and up to 5.0% merit
OCSD 19-13-1
increase as determined by the General Manager, not to exceed 8.0% total and not
to exceed Step 5 of the corresponding pay range;
• A salary increase in the first pay period of July 2021, consisting of a 3.0% salary
range adjustment and corresponding salary increases and up to 5.0% merit
increase as determined by the General Manager, not to exceed 8.0% total and not
to exceed Step 5 of the corresponding pay range;
• An increase in the amount of the matching 457(b) contribution to provide up to
$300 a month for Executive Management Team employees who do not receive IIS
or are assigned to the classic open or PEPRA plans.
That the General Manager, or his designee, is authorized to implement the changes
to salary ranges, salaries, benefits, and performance increases approved herein.
PASSED AND ADOPTED at a regular meeting of the Board of Directors held
September 25, 2019.
David John Shawver
Board Chairman
ATTEST:
Kelly A. Lore, MMC
Clerk of the Board
OCSD 19-13-2
STATE OF CALIFORNIA )
ss
COUNTY OF ORANGE )
I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation
District, do hereby certify that the foregoing Resolution No. OCSD 19-13 was passed and
adopted at a regular meeting of said Board on the 25t" day of September 2019, by the
following vote, to wit:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal
of Orange County Sanitation District this 25t" day of September 2019.
Kelly A. Lore, MMC
Clerk of the Board of Directors
Orange County Sanitation District
OCSD 19-13-3
Orange County Sanitation District
Classification and Compensation Plan
FY 2018/2019 (Current Year)
Rates Effective July 6,2018
EXECUTIVE MANAGEMENT GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Assistant General Manager EM32 $ 226,074 $ 237,635 $ 249,788 $ 262,562 $ 275,990
Director of Engineering EM27 $ 199,817 $ 210,035 $ 220,776 $ 232,067 $ 243,935
Director of Operations&Maintenance EM26 $ 194,943 $ 204,912 $ 215,392 $ 226,407 $ 237,985
Director of Environmental Services
Director of Finance&Administrative Services EM25 $ 190,188 $ 199,914 $ 210,138 $ 220,885 $ 232,181
Director of Human Resources
Orange County Sanitation District
Classification and Compensation Plan
FY 2019/2020 (Year One)
PROPOSED Rates for July 2019
EXECUTIVE MANAGEMENT GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Assistant General Manager EM32 $ 232,856 $ 244,774 $ 257,275 $ 270,442 $ 284,274
Director of Engineering EM27 $ 205,816 $ 216,341 $ 227,386 $ 239,034 $ 251,264
Director of Operations&Maintenance I EM26 $ 200,782 $ 211,078 $ 221,853 $ 233,210 $ 245,128
Director of Environmental Services
Director of Finance&Administrative Services EM25 $ 195,894 $ 205,899 $ 216,445 $ 227,510 $ 239,158
Director of Human Resources
FY 2020/2021 (Year Two)
PROPOSED Rates for July 2020
EXECUTIVE MANAGEMENT GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Assistant General Manager EM32 $ 239,845 $ 252,117 $ 264,992 $ 278,554 $ 292,802
Director of Engineering EM27 $ 211,994 $ 222,830 $ 234,208 $ 246,210 $ 258,794
Director of Operations&Maintenance EM26 $ 206,814 $ 217,402 $ 228,509 $ 240,198 $ 252,491
Director of Environmental Services
Director of Finance&Administrative Services EM25 $ 201,781 $ 212,077 $ 222,934 $ 234,333 $ 246,334
Director of Human Resources
Orange County Sanitation District
Classification and Compensation Plan
FY 2021/2022 (Year Three)
PROPOSED Rates for July 2021
EXECUTIVE MANAGEMENT GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Assistant General Manager EM32 $ 247,042 $ 259,688 $ 272,938 $ 286,915 $ 301,579
Director of Engineering EM27 $ 218,358 $ 229,507 $ 241,238 $ 253,594 $ 266,573
Director of Operations&Maintenance EM26 $ 213,013 $ 223,933 $ 235,373 $ 247,395 $ 260,062
Director of Environmental Services
Director of Finance&Administrative Services EM25 $ 207,834 $ 218,442 $ 229,632 $ 241,363 $ 253,718
Director of Human Resources
RESOLUTION NO. OCSD 19-14
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT APPROVING SALARY
INCREASES, SALARY RANGE ADJUSTMENTS, AND A MINOR
INCREASE TO 457(B) MATCHING CONTRIBUTIONS FOR
UNREPRESENTED MANAGEMENT EMPLOYEES FOR FISCAL
YEAR 2019/2020, FISCAL YEAR 2020/2021, AND FISCAL YEAR
2021/2022
WHEREAS, there are fourteen (14) employees in the management employees job
classifications at the Orange County Sanitation District ("OCSD") who serve as
organizational leaders and oversee staff within particular divisions and/or workgroups to
align performance outcomes with the strategic goals of the agency; and
WHEREAS, management employees are unrepresented and meet directly with
the General Manager about terms and conditions of employment; and
WHEREAS, in 2016 the Board authorized the General Manager to administer the
Board approved Manager Group pay plan through a pay for performance system with pay
range steps; and
WHEREAS, the General Manager entered into discussions with the management
employees, which resulted in agreed upon proposed salary increases, salary range
adjustments, performance-based merit increases, and minor benefit adjustments; and
WHEREAS, the parties agreed that the salary changes would take effect the first
pay period in July 2019 and the start of the new fiscal year in alignment with the other
employee unit increases.
NOW, THEREFORE, the Board of Directors of the Orange County Sanitation
District, DOES HEREBY RESOLVE, DETERMINE, AND ORDER:
That the Board of Directors hereby authorizes and approves the following changes to
salaries and benefits for management employees, which shall become effective the first
pay period of July 2019:
• A salary increase in the first pay period of July 2019, consisting of a 3.0% salary
range adjustment and corresponding salary increases and up to 5.0% merit
increase as determined by the General Manager, not to exceed 8.0% total and not
to exceed Step 5 of the corresponding pay range, is hereby approved to be
effective retroactively to the first pay period of July 2019;
• A salary increase in the first pay period of July 2020, consisting of a 3.0% salary
range adjustment and corresponding salary increases and up to 5.0% merit
OCSD 19-14-1
increase as determined by the General Manager, not to exceed 8.0% total and not
to exceed Step 5 of the corresponding pay range;
• A salary increase in the first pay period of July 2021, consisting of a 3.0% salary
range adjustment and corresponding salary increases and up to 5.0% merit
increase as determined by the General Manager, not to exceed 8.0% total and not
to exceed Step 5 of the corresponding pay range;
• An increase in the amount of the matching 457(b) contribution to provide up to
$300 a month for Executive Management Team employees who do not receive IIS
or are assigned to the classic open or PEPRA plans.
That the General Manager, or his designee, is authorized to implement the changes to
salary ranges and structure, salaries, benefits, and performance increases approved
herein.
PASSED AND ADOPTED at a regular meeting of the Board of Directors held
September 25, 2019.
David John Shawver
Board Chairman
ATTEST:
Kelly A. Lore, MMC
Clerk of the Board
OCSD 19-14-2
STATE OF CALIFORNIA )
ss
COUNTY OF ORANGE )
I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation
District, do hereby certify that the foregoing Resolution No. OCSD 19-14 was passed and
adopted at a regular meeting of said Board on the 25t" day of September 2019, by the
following vote, to wit:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal
of Orange County Sanitation District this 25t" day of September 2019.
Kelly A. Lore, MMC
Clerk of the Board of Directors
Orange County Sanitation District
OCSD 19-14-3
Orange County Sanitation District
Classification and Compensation Plan
FY 2018/2019 (Current Year)
Rates Effective July 6,2018
MANAGERS GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Engineering Manager EM18 1 $ 159,999 1 $ 168,181 1 $ 176,782 1 $ 185,823 1 $ 195,326
Administration Manager
Controller
Environmental Lab&Ocean Monitoring Manager
Human Resources&Risk Manager EM16 $ 152,289 $ 160,077 $ 168,264 $ 176,869 $ 185,914
IT Systems&Operations Manager
Maintenance Manager
Operations Manager
Purchasing&Contracts Manager
7/5/19
Orange County Sanitation District
Classification and Compensation Plan
FY 2019/2020 (Year One)
PROPOSED Rates for July 2019
MANAGERS GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Engineering Manager EM18 $ 164,798 $ 173,243 $ 182,083 $ 191,401 $ 201,198
Administration Manager
Controller
Environmental Lab&Ocean Monitoring Manager
Human Resources&Risk Manager EM16 $ 156,873 $ 164,881 $ 173,326 $ 182,166 $ 191,484
IT Systems&Operations Manager
Maintenance Manager
Operations Manager
Purchasing&Contracts Manager
FY 2020/2021 (Year Two)
PROPOSED Rates for July 2020
MANAGERS GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Engineering Manager EM18 $ 169,748 $ 178,443 $ 187,553 $ 197,142 $ 207,230
Administration Manager
Controller
Environmental Lab&Ocean Monitoring Manager
Human Resources&Risk Manager EM16 $ 161,574 $ 169,832 $ 178,526 $ 187,636 $ 197,225
IT Systems&Operations Manager
Maintenance Manager
Operations Manager
Purchasing&Contracts Manager
7/5/19
Orange County Sanitation District
Classification and Compensation Plan
FY 2021/2022 (Year Three)
PROPOSED Rates for July 2021
MANAGERS GROUP
Classification I Pay Gradel Step 1 1 Step 2 1 Step 3 1 Step 4 1 Step 5
Engineering Manager EM18 1 $ 174,844 1 $ 183,788 1 $ 193,190 1 $ 203,049 1 $ 213,449
Administration Manager
Controller
Environmental Lab&Ocean Monitoring Manager
Human Resources&Risk Manager EM16 $ 166,420 $ 174,928 $ 183,872 $ 193,273 $ 203,132
IT Systems&Operations Manager
Maintenance Manager
Operations Manager
Purchasing&Contracts Manager
7/s/19
oJ�1V SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
STEERING COMMITTEE (714)5937433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-615 Agenda Date: 9/25/2019 Agenda Item No: 19.
FROM: James D. Herberg, General Manager
Originator: Celia Chandler, Director of Human Resources
SUBJECT:
CONFIDENTIAL EMPLOYEE GROUP COMPENSATION BENEFITS
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
A. Adopt Resolution No. OCSD 19-15 entitled, "A Resolution of the Board of Directors of the
Orange County Sanitation District approving salary range adjustments and consideration to
establish a Health Retirement Account for unrepresented exempt confidential employees for
Fiscal Year 2019/2020, Fiscal Year 2020/2021, and Fiscal Year 2021/2022".
B. Adopt Resolution No. OCSD 19-16 entitled, "A Resolution of the Board of Directors of the
Orange County Sanitation District approving salary range adjustments, a minor increase in
Development Pay, and consideration to establish a Health Retirement Account for
unrepresented non-exempt confidential employees for Fiscal Year 2019/2020, Fiscal Year
2020/2021, and Fiscal Year 2021/2022".
BACKGROUND
Confidential employees perform duties and responsibilities that support Orange County Sanitation
District (Sanitation District) management with labor relations. Confidential employees are not
represented by a bargaining unit and meet directly with the General Manager regarding terms and
conditions of employment.
Exempt level confidential employees perform work and duties that align with that of employees in the
Supervisor Group and Professional Group bargaining units. However, due to their job duties in
support of the labor relations program, confidential employees are not represented by a bargaining
unit. Therefore, although they are in separate groups, unrepresented exempt level confidential
employees' wages and benefits historically have aligned with represented employees' negotiated
wages and benefits in the Supervisor Group and Professional Group.
Similarly, non-exempt level confidential employees perform work and duties that align with that of
employees in the Orange County Employees Association (OCEA) bargaining units. However, due to
their job duties in support of the labor relations program, confidential employees are not represented
by a bargaining unit. Therefore, although they are in separate groups, unrepresented non-exempt
confidential employees' wages and benefits historically have aligned with represented employees'
Orange County Sanitation District Page 1 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-615 Agenda Date: 9/25/2019 Agenda Item No: 19.
negotiated wages and benefits in the OCEA groups.
The General Manager is proposing the following adjustments for exempt- and non-exempt-level
confidential employees that align with represented employee wages and benefits.
• Salary Range Adjustments (3-Year Cost: $363,934)
• 3% salary range adjustment and corresponding salary increases in Year 1; 3% salary range
adjustment and corresponding salary increases in Year 2; and 3% salary range adjustment
and corresponding salary increases in Year 3.
• Insurance - Conduct discussions to consider establishment of Health Retirement Account
(HRA) for employees.
RELEVANT STANDARDS
• Ensure the public's money is wisely spent
• Offer competitive compensation and benefits
• Cultivate a highly qualified, well-trained, and diverse workforce
• Maintain positive employer-employee relations
• Provide professional growth and development
PROBLEM
The Memoranda of Understanding (MOUs) between the Sanitation District and similarly situated
groups in the Supervisory and Professional Management Group (SPMG) and OCEA - Administrative
& Clerical Unit bargaining units that became effective on July 1, 2016, expired on June 30, 2019.
Successor MOUs were approved by the Board on August 28, 2019, for the similarly situated SPMG
and OCEA groups, including salary increases of 3% annually for each of the three years of the
agreements. Terms for the similarly situated exempt- and non-exempt level Confidential Group
employees have not yet been approved.
PROPOSED SOLUTION
Adopt Resolution No. OCSD 19-15, entitled, "A Resolution of the Board of Directors of the Orange
County Sanitation District approving salary range adjustments and consideration to establish a
Health Retirement Account for unrepresented exempt confidential employees for Fiscal Year
2019/2020, Fiscal Year 2020/2021, and Fiscal Year 2021/2022".
Adopt Resolution No. OCSD 19-16, entitled, "A Resolution of the Board of Directors of the Orange
County Sanitation District approving salary range adjustments, a minor increase in Development
Pay, and consideration to establish a Health Retirement Account for unrepresented non-exempt
confidential employees for Fiscal Year 2019/2020, Fiscal Year 2020/2021, and Fiscal Year
2021/2022".
TIMING CONCERNS
Labor agreements including salary increases for the corresponding represented groups were
approved at the August 28, 2019 Board of Directors meeting.
Orange County Sanitation District Page 2 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-615 Agenda Date: 9/25/2019 Agenda Item No: 19.
Salary and benefits for other unrepresented employees, including Executive Management Team and
Managers, will be considered at the September 25, 2019, Board of Directors meeting.
RAMIFICATIONS OF NOT TAKING ACTION
• Potential labor instability
• Possible impacts to morale
• Inconsistency in compensation between represented and unrepresented classifications
PRIOR COMMITTEE/BOARD ACTIONS
August 2019 - Board approved successor Memoranda of Understanding, including salary
adjustments, for represented employees in similarly situated groups in the SPMG and OCEA
bargaining units for Fiscal Years 2019/2020, 2020/2021, and 2021/2022.
November 2016 - Approved Resolutions No. OCSD 16-25 and 16-26, which provided salary
adjustments to non-exempt and exempt confidential employees, respectively, for Fiscal Years
2016/2017, 2017/2018, and 2018/2019 based on similarly situated groups.
October 2016 - Approved Resolutions No. OCSD 16-21 and 16-22, which provided salary
adjustments for represented employees in similarly situated groups in the SPMG and OCEA
bargaining units for Fiscal Years 2016/2017, 2017/2018, and 2018/2019.
ADDITIONAL INFORMATION
There are currently fifteen (15) exempt level confidential employees at the Sanitation District in seven
(7) classifications. Confidential employees are those employees who, with authorized access, assist
and act in a confidential capacity to and for persons who formulate, determine, and effectuate
management policies with respect to labor relations.
Exempt level confidential employees hold the following classifications:
Assistant Clerk of the Board
Clerk of the Board
Human Resources Analyst
Human Resources Supervisor
Principal Human Resources Analyst
Secretary to the General Manager
Senior Human Resources Analyst
There are currently two (2) non-exempt confidential employees at the Sanitation District in one (1)
classification. Confidential employees are those employees who, with authorized access, assist and
act in a confidential capacity to and for persons who formulate, determine, and effectuate
management policies with respect to labor relations.
Orange County Sanitation District Page 3 of 4 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-615 Agenda Date: 9/25/2019 Agenda Item No: 19.
Non-exempt confidential employees hold the following classification: Human Resources Assistant.
Confidential employees are not represented by a bargaining unit; instead, confidential employees
represent themselves as a group in informal discussions with the Sanitation District's General
Manager regarding wages, hours, and other terms and conditions of employment. The General
Manager recommends the following changes:
• Salary
Year 1 - 3% Salary Increase, retroactive to the first pay period of July 2019.
Year 2 - 3% Salary Increase, effective the first pay period of July 2020.
Year 3 - 3% Salary Increase, effective the first pay period of July 2021.
CEQA
N/A
FINANCIAL CONSIDERATIONS
The total cost of the salary range adjustment increases and minor changes to benefits for confidential
employee classifications is approximately $368,363 over the three-year term.
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Resolution No. OCSD 19-15 (Exempt Confidential Employees)
• Resolution No. OCSD 19-16 (Non-Exempt Confidential Employees)
• Current Salary Schedule for Confidential Group (FY 2018/2019)
• Proposed Salary Schedules for Confidential Group for FY 2019/2020, FY 2020/2021, and FY
2021/2022
Orange County Sanitation District Page 4 of 4 Printed on 9/19/2019
powered by LegistarTM
RESOLUTION NO. OCSD 19-15
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT APPROVING
SALARY RANGE ADJUSTMENTS AND CONSIDERATION TO
ESTABLISH A HEALTH RETIREMENT ACCOUNT FOR
UNREPRESENTED EXEMPT CONFIDENTIAL EMPLOYEES
FOR FISCAL YEAR 2019/2020, FISCAL YEAR 2020/2021 &
FISCAL YEAR 2021/2022
WHEREAS, there are seventeen (17) employees in the confidential employees
job classifications at the Orange County Sanitation District ("OCSD") who, with
authorized access, assist and act in a confidential capacity to and for persons who
formulate, determine, and effectuate management policies with respect to labor
relations; and
WHEREAS, there are fifteen (15) confidential employees holding exempt level
classifications; and
WHEREAS, exempt level confidential employees are unrepresented and meet
directly with the General Manager about terms and conditions of employment; and
WHEREAS, the General Manager recently entered into discussions with the
exempt level confidential employees and completed negotiations in August 2019, which
resulted in agreed upon proposed changes to wages and benefits that align with those
agreed upon for represented employees.
NOW, THEREFORE, in consideration thereof, the Board of Directors of the
Orange County Sanitation District, DOES HEREBY RESOLVE, DETERMINE, AND
ORDER:
1. That the Board of Directors hereby authorizes and approves the following
changes to wage and benefits for exempt level confidential employees, which shall
become effective as noted:
a) Salaries
• To align with similarly situated represented employee classifications,
exempt level confidential employees' salaries shall be adjusted per the
following:
• Year 1 — 3.0% Salary Range Adjustment and corresponding
salary increase, retroactive to the first pay period of July 2019.
• Year 2 — 3.0% Salary Range Adjustment and corresponding
salary increase, effective the first pay period of July 2020.
• Year 3 — 3.0% Salary Range Adjustment and corresponding
salary increase, effective the first pay period of July 2021.
OCSD 19-15-1
b) Insurance
• Conduct discussions to consider establishment of Health
Retirement Account (HRA) for employees.
PASSED AND ADOPTED at a regular meeting of the Board of Directors held
September 25, 2019.
David John Shawver
Board Chairman
ATTEST:
Kelly A. Lore, MMC
Clerk of the Board
OCSD 19-15-2
STATE OF CALIFORNIA )
ss
COUNTY OF ORANGE )
I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation
District, do hereby certify that the foregoing Resolution No. OCSD 19-15 was passed
and adopted at a regular meeting of said Board on the 25t" day of September 2019, by
the following vote, to wit:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official
seal of Orange County Sanitation District this 25t" day of September 2019.
Kelly A. Lore, MMC
Clerk of the Board of Directors
Orange County Sanitation District
OCSD 19-15-3
RESOLUTION NO. OCSD 19-16
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
ORANGE COUNTY SANITATION DISTRICT APPROVING
SALARY RANGE ADJUSTMENTS, A MINOR INCREASE IN
DEVELOPMENT PAY, AND CONSIDERATION TO ESTABLISH A
HEALTH RETIREMENT ACCOUNT FOR UNREPRESENTED
NON-EXEMPT CONFIDENTIAL EMPLOYEES FOR FISCAL YEAR
2019/2020, FISCAL YEAR 2020/2021 & FISCAL YEAR 2021/2022
WHEREAS, there are seventeen (17) employees in the confidential employees
job classifications at the Orange County Sanitation District ("OCSD") who, with
authorized access, assist and act in a confidential capacity to and for persons who
formulate, determine, and effectuate management policies with respect to labor
relations; and
WHEREAS, there are two (2) confidential employees holding a non-exempt
classification; and
WHEREAS, non-exempt confidential employees are unrepresented and meet
directly with the General Manager about terms and conditions of employment; and
WHEREAS, the General Manager recently entered into discussions with the non-
exempt confidential employees and completed negotiations in August 2019, which
resulted in agreed upon proposed changes to wages and benefits that align with those
agreed upon for represented employees.
NOW, THEREFORE, in consideration thereof, the Board of Directors of the
Orange County Sanitation District, DOES HEREBY RESOLVE, DETERMINE, AND
ORDER THE FOLLOWING:
1. That the Board of Directors hereby authorizes and approves the following
changes to wage and benefits for non-exempt confidential employees, which shall
become effective as noted:
a) Salaries
• To align with similarly situated represented employee classifications,
non-exempt confidential employees' salaries shall be adjusted per the
following:
• Year 1 — 3.0% Salary Range Adjustment and corresponding
salary increase, retroactive to the first pay period of July 2019.
• Year 2 — 3.0% Salary Range Adjustment and corresponding
salary increase, effective the first pay period of July 2020.
• Year 3 — 3.0% Salary Range Adjustment and corresponding
salary increase, effective the first pay period of July 2021.
OCSD 19-16-1
b) Benefits
• Increase Development Pay for Certification/License for non-exempt
confidential employees to $15.24 per pay period per certificate or
license with a maximum of three (3) certificates and/or licenses.
c) Insurance
o Conduct discussions to consider establishment of Health
Retirement Account (HRA) for employees.
PASSED AND ADOPTED at a regular meeting of the Board of Directors held
September 25, 2019.
David John Shawver
Board Chairman
ATTEST:
Kelly A. Lore, MMC
Clerk of the Board
OCSD 19-16-2
STATE OF CALIFORNIA )
ss
COUNTY OF ORANGE )
I, Kelly A. Lore, Clerk of the Board of Directors of the Orange County Sanitation
District, do hereby certify that the foregoing Resolution No. OCSD 19-16 was passed
and adopted at a regular meeting of said Board on the 25t" day of September 2019, by
the following vote, to wit:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official
seal of Orange County Sanitation District this 25t" day of September 2019.
Kelly A. Lore, MMC
Clerk of the Board of Directors
Orange County Sanitation District
OCSD 19-16-3
Orange County Sanitation District
Classification and Compensation Plan
Rates Effective July 6,2018
CONFIDENTIAL GROUP
Pay STEP STEP STEP STEP STEP_j
Classification Grade 1 1 2 3 4 5
Human Resources Supervisor I CON901 $ 61.88 1 $ 64.99 1 $ 68.21 1 $ 71.62 1 $ 75.22
$ 128,710.40 $ 135,179.20 $ 141,876.80 $ 148,969.60 $ 156,457.60
Clerk of the Board I CON841 $ 53.34 1 $ 56.01 1 $ 58.81 1 $ 61.75 1 $ 64.84
Principal Human Resources Analyst I CON84 $ 110,947.20 1 $ 116,500.80 1 $ 122,324.80 1 $ 128,440.00 1 $ 134,867.20
Senior Human Resources Analyst I CON761 $ 43.82 1 $ 45.96 1 $ 48.27 1 $ 50.69 1 $ 53.22
$ 91,145.60 $ 95,596.80 $ 100,401.60 $ 105,435.20 $ 110,697.60
Assistant Clerk of the Board I CON731 $ 40.65 1 $ 42.69 1 $ 44.82 1 $ 47.06 1 $ 49.42
Secretary to the General Manager I CON731 $ 84,552.00 1 $ 88,795.20 1 $ 93,225.60 1 $ 97,884.80 1 $ 102,793.60
Human Resources Analyst I CON701 $ 37.76 1 $ 39.65 1 $ 41.64 1 $ 43.73 1 $ 45.91
$ 78,540.80 $ 82,472.00 $ 86,611.20 $ 90,958.40 $ 95,492.80
Human Resources Assistant I CON671 $ 36.47 1 $ 38.29 1 $ 40.21 1 $ 42.21 1 $ 44.32
$ 75,857.60 $ 79,643.20 $ 83,636.80 $ 87,796.80 $ 92,185.60
3/1/19
Orange County Sanitation District
Classification and Compensation Plan
FY 2019-20 (Year One)
PROPOSED Rates for July 2019
CONFIDENTIAL GROUP
Classification Pay STEP STEP STEP STEP STEP
Grade 1 2 3 4 5
Human Resources Supervisor CON90 $ 63.74 $ 66.94 $ 70.26 $ 73.77 $ 77.48
$132,579.20 $139,235.20 $146,140.80 $153,441.60 $161,158.40
Clerk of the Board CON84 $ 54.94 $ 57.69 $ 60.57 $ 63.60 $ 66.79
Principal Human Resources Analyst CON84 $114,275.20 $119,995.20 $125,985.60 $132,288.00 $138,923.20
Senior Human Resources Analyst CON76 $ 45.13 $ 47.34 $ 49.72 $ 52.21 $ 54.82
$ 93,870.40 $ 98,467.20 $103,417.60 $108,596.80 $114,025.60
Assistant Clerk of the Board CON73 $ 41.87 $ 43.97 $ 46.16 $ 48.47 $ 50.90
Secretary to the General Manager CON73 $ 87,089.60 $ 91,457.60 $ 96,012.80 $100,817.60 $105,872.00
Human Resources Analyst CON70 $ 38.89 $ 40.84 $ 42.89 $ 45.04 $ 47.29
$ 80,891.20 $ 84,947.20 $ 89,211.20 $ 93,683.20 $ 98,363.20
Human Resources Assistant CON67 $ 37.56 $ 39.44 $ 41.42 $ 43.48 $ 45.65
$ 78,124.80 $ 82,035.20 $ 86,153.60 $ 90,438.40 $ 94,952.00
FY 2020-21 (Year Two)
PROPOSED Rates for July 2020
CONFIDENTIAL GROUP
Classification Pay STEP STEP STEP STEP STEP
Grade 1 2 3 4 5
Human Resources Supervisor CON90 $ 65.65 $ 68.95 $ 72.37 $ 75.98 $ 79.80
$136,552.00 $143,416.00 $150,529.60 $158,038.40 $165,984.00
Clerk of the Board CON84 $ 56.59 $ 59.42 $ 62.39 $ 65.51 $ 68.79
Principal Human Resources Analyst CON84 $117,707.20 $123,593.60 $129,771.20 $136,260.80 $143,083.20
Senior Human Resources Analyst CON76 $ 46.48 $ 48.76 $ 51.21 $ 53.78 $ 56.46
$ 96,678.40 $101,420.80 $106,516.80 $111,862.40 $117,436.80
Assistant Clerk of the Board CON73 $ 43.13 $ 45.29 $ 47.54 $ 49.92 $ 52.43
Secretary to the General Manager CON73 $ 89,710.40 $ 94,203.20 $ 98,883.20 $103,833.60 $109,054.40
Human Resources Analyst CON70 $ 40.06 $ 42.07 $ 44.18 $ 46.39 $ 4 8.7 1
$ 83,324.80 $ 87,505.60 $ 91,894.40 $ 96,491.20 $101,316.80
Human Resources Assistant CON67 $ 38.69 $ 40.62 $ 42.66 $ 44.78 $ 47.02
$ 80,475.20 $ 84,489.60 $ 88,732.80 $ 93,142.40 $ 97,801.60
Orange County Sanitation District
Classification and Compensation Plan
FY 2021-22 (Year Three)
PROPOSED Rates for July 2021
CONFIDENTIAL GROUP
Classification Pay STEP STEP STEP STEP STEP
Grade 1 2 3 4 5
Human Resources Supervisor CON90 $ 67.62 $ 71.02 $ 74.54 $ 78.26 $ 82.19
$140,649.60 $147,721.60 $155,043.20 $162,780.80 $170,955.20
Clerk of the Board CON84 $ 58.29 $ 61.20 $ 64.26 $ 67.48 $ 70.85
Principal Human Resources Analyst CON84 $121,243.20 $127,296.00 $133,660.80 $140,358.40 $147,368.00
Senior Human Resources Analyst CON76 $ 47.87 $ 50.22 $ 52.75 $ 55.39 $ 58.15
$ 99,569.60 $104,457.60 $109,720.00 $115,211.20 $120,952.00
Assistant Clerk of the Board CON73 $ 44.42 $ 46.65 $ 48.97 $ 51.42 $ 54.00
Secretary to the General Manager CON73 $ 92,393.60 $ 97,032.00 $101,857.60 $106,953.60 $112,320.00
Human Resources Analyst CON70 $ 41.26 $ 43.33 $ 45.51 $ 47.78 $ 50.17
$ 85,820.80 $ 90,126.40 $ 94,660.80 $ 99,382.40 $104,353.60
Human Resources Assistant CON67 $ 39.85 $ 41.84 $ 43.94 $ 46.12 $ 48.43
$ 82,888.00 $ 87,027.20 $ 91,395.20 $ 95,929.60 $100,734.40
oJ�jV SAN17gTO9 Orange Count Sanitation District Administration Building
5� o, g � 10844 Ellis Avenue
2 9 Fountain Valley, CA 92708
BOARD OF DIRECTORS (714)593 7433
9oTFCTN0 THE ENVQ����2
Agenda Report
File #: 2019-590 Agenda Date: 9/25/2019 Agenda Item No: 20.
FROM: James D. Herberg, General Manager
Originator: Rob Thompson, Assistant General Manager
SUBJECT:
STRATEGIC PLAN DEVELOPMENT
GENERAL MANAGER'S RECOMMENDATION
RECOMMENDATION:
Provide input to staff on the development of the Strategic Plan.
BACKGROUND
The Orange County Sanitation District (Sanitation District) is developing its Strategic Plan. The
strategic plan is a policy level roadmap which defines the future desired state of the agency and lays
out initiatives to move toward that desired state.
Staff has offered 14 individual policy areas which, when fully developed, will comprise the overall
Strategic Plan. Preliminary policy statements have been developed by the Executive Management
team based on survey input previously provided by Board Members and staff. Board of Director
input is critical to the development of the Strategic Plan. In order to properly review and receive
input, the items will be presented individually over three Board of Directors' meetings as follows:
August 28
• Budget Control and Fiscal Discipline
• Energy Independence
• Asset Management
• Chemical Sustainability
• Climate and Catastrophic Event Resiliency
September 18
• Biosolids Management
• Constituents of Emerging Concern
• Food Waste Treatment
• Environmental Water Quality, Stormwater Management and Urban Runoff
• Water Reuse
Orange County Sanitation District Page 1 of 2 Printed on 9/19/2019
powered by LegistarTM
File #: 2019-590 Agenda Date: 9/25/2019 Agenda Item No: 20.
September 25
• Resilient Staffing
• Safety and Physical Security
• Cyber Security
• Property Management
Staff intends to finalize the items and compile them into a draft plan for formal adoption in October or
November of this year. The adopted Strategic Plan will be the basis of Fiscal Year 2020-21 and 2021
-22 budget development.
RELEVANT STANDARDS
• Engage the Board of Directors in setting public policy
• Build brand, trust and support with policy makers and community leaders
PROBLEM
The Strategic Plan needs to be updated.
PROPOSED SOLUTION
Solicit and incorporate the Board of Directors' input in the development of the proposed Strategic
Plan document.
ATTACHMENT
The following attachment(s) are included in hard copy and may also be viewed on-line at the OCSD website
(www.ocsd.com) with the complete agenda package:
• Proposed Orange County Sanitation District Resilient Staffing Policy Statement
• Proposed Orange County Sanitation District Safety and Physical Security Policy Statement
• Proposed Orange County Sanitation District Cyber Security Policy Statement
• Proposed Orange County Sanitation District Property Management Policy Statement
Orange County Sanitation District Page 2 of 2 Printed on 9/19/2019
powered by LegistarTM
Proposed Orange County Sanitation District
Resilient Staffing Policy
Has OCSD properly prepared for the future challenges of employee attrition and loss of
institutional knowledge through employee development and leadership programs?
Summary Policy Statement
The Sanitation District will attract and retain high-quality talent to support its mission and
continue to be an industry leader. It will safeguard leadership continuity and support
effective performance of the organization by proactively monitoring the changing work
environment and requirements to ensure development programs are relevant and build
a skilled bench of readily available successors for key leadership and mission-critical
positions.
Background
At the Sanitation District, employees are the organization's most valuable resource.
With over 600 dedicated employees whose collective efforts make OCSD an industry
leader, the Sanitation District continues to receive national awards and recognition.
That is why, OCSD has committed to invest in its employees, resulting in a highly skilled
and educated workforce carrying out the mission of protecting public health and the
environment.
The Sanitation District has a diverse workforce and a wide range of expertise with
approximately 70 percent of positions requiring a degree, certification, and/or license.
Occupations on-site include scientists, engineers, environmental and regulatory
specialists, operators, mechanics, construction inspectors, as well as professionals in
public affairs, finance, IT, safety and human resources.
To cultivate a committed and engaged workforce in a competitive economy, OCSD
must promote initiatives to attract and retain talent and prepare staff for successful
careers. Strategic succession management initiatives have been developed and
adopted that support the design and implementation of comprehensive workforce
planning and development tools accompanied by activities that facilitate the
improvement of workforce capability, adaptability, efficiency, and accountability.
Strategic workforce planning empowers management to project the loss of knowledge
and experience caused by retirement and attrition and utilizes a variety of methods to
ensure that the Sanitation District has adequate access to talent internally and
externally through the recruitment and selection process.
The Sanitation District has a competitive recruitment process that ensures we hire the
best person for the job based on qualifications and merit. Human Resources utilizes an
objective multi-hurdle approach to hiring which includes Human Resources review and
recommendation, subject matter expert application screening, assessment centers,
panel interviews (both for technical skills and fit), skills testing, background checks, and
reference checks.
Programs that have proven effective in attracting, retaining and developing highly skilled
staff for key positions, include:
• Vocational/Professional Student Internship Programs
Students from the Water Utility Science Program at Santiago Canyon College,
and Los Angeles Trade Technical College work 28 hours a week and rotate
through five technical trades for 53 weeks in our Operations and Maintenance
Department. We started the program in 2010 with four positions and have grown
to offer ten positions for each fiscal year. Furthermore, 14 of the program
participants have been hired full-time since the program inception. The
Sanitation District is piloting the program with other technical colleges in
Southern California, to include Cypress College. OCSD offers student and
vocational internships, as well as job shadowing and externships.
The Sanitation District's Professional Student Internship Program offers students
an opportunity to work at the professional ranks while attending college full-time
for a two-year maximum duration. OCSD partners with Cal State Fullerton, Long
Beach, Cal Poly Pomona and UC Irvine, among others.
• Employee Development Program
In addition to legally mandated training, the Sanitation District provides training
and development opportunities for the purpose of increasing job knowledge and
to maximize skill sets in employees' current positions and to prepare them for
future mission-critical positions. Comprehensive training programs include
technical training through industry-specific associations or groups, local schools,
and professionals as well as informal on the job training. Employees are
encouraged to obtain job-related training necessary to keep OCSD current with
recent industry best practices and developments in their respective fields of
expertise and can receive Development Pay in select categories that the
Sanitation District deems mission-critical. As 70 percent of OCSD's positions
require a degree, certificate and/or license, the Sanitation District also promotes
professional development through its tuition and certification reimbursement
programs for courses completed toward obtaining an associate's, bachelor's or
master's degree at accredited colleges, universities, or other institutions or
industry specific certifications that are applicable to the industry.
• Workforce Vulnerability Assessments
Each year, the Sanitation District management conducts an evaluation of their
respective departments and identifies key and vulnerable positions based on
three criteria: criticality, retention, and difficulty to fill. Vulnerability assessments
provide a broader view into the areas of the agency that could potentially be
facing a high risk in turnover and are essential to operations. Management is
tasked with identifying positions based on the criteria above, then making
recommendations on the level of action that is required, complete with proposed
action plans. Human Resources staff works closely with management to
facilitate workforce vulnerability assessments to develop current and future
staffing plans. It is essential that the Sanitation District continues to focus its
efforts on prioritizing staffing needs.
• Talent Readiness Assessments
The process includes departmental leadership evaluating staff and identifying
key employee talent, as well as possible development efforts. Feeder positions
are identified, and talent pools are developed between employees and
management that align with agency goals and builds the talent pipeline.
• Building Leaders and Skills for Tomorrow (BLAST) Program
In 2011, the Sanitation District began a comprehensive leadership development
program to supplement the technical training courses, and includes job
shadowing, mentoring, web-based and instructor-led training on soft skills and
leadership development. The goal of this development program is to ensure
OCSD is building leaders at all levels. Development opportunities are offered to
address the potential loss of talent and feed into the Succession Management
and Employee Development programs, primarily focusing on soft skills training.
The leadership development components include a public sector leadership
academy with Cal State Fullerton, and a supervisory training program through
Brandman University.
The Sanitation District partnered with UC Irvine, Cal State University at Long Beach and
California Polytechnic University at Pomona, which provided students an opportunity to
job shadow Human Resources and Engineering staff to gain insight into the profession,
employment in the public sector and the wastewater industry. The Sanitation District
employees also serve on Advisory Councils that weigh in on course curriculum at
various schools, both at the high school and college level, across Southern California.
Throughout the agency, we have several employees who are active members of various
professional associations, serve on a Board, or volunteer in various capacities within the
industry. The Sanitation District staff is regularly asked to present and teach others
about resource recovery. Recruiters attend job fairs, and work closely with universities,
professional organizations, and serve on advisory committees.
Education and workforce investment programs represent the most important
preparation we can accomplish today to safeguard the agency's future for tomorrow.
Finding an adequate pool of applicants and retaining qualified workers is increasingly
difficult, which we anticipate will continue on into the future. Retirements are disrupting
employment within our industry and changes in technology have made work more
complex.
Current Situation
Academics studying the labor force attribute labor shortages to workforce
demographics. Depending on the source data, the timelines defining the start/end time
of these groups may vary but generally - Baby Boomers are those born between 46-64,
followed by Gen Xers 65-81, and lastly Millennials from 82-00. Close to half of staff or
49 percent fall into the "Gen Xers" category, followed by 32 percent made up of"Baby
Boomers" and "Millennials" make up 19 percent of our employee population. The
Sanitation District is currently facing a potential loss of close to half of its workforce —
about 45 percent of employees, primarily from the Baby Boomers group, and some Gen
Xers. This represents a potential loss of about 271 people to retirement alone and does
not account for other forms of turnover. Hence the need to be proactive and strategic in
OCSD's approach to maintain its staffing levels and ensure continuity of operations.
Currently, the majority of OCSD's executives are eligible for retirement. Managers, our
next level of leadership, closely follow with 45 percent of them eligible to retire now, and
that number increases to 90 percent in five years. The Sanitation District has a little
more stability in the trades and professional occupations with retirement eligibility at 53
percent in the next five years. OCSD has a lot of long-term employees with vast
knowledge in their respective areas of expertise. Some employees have been a part of
the OCSD family for over 35 years; and at last count, ten years was the average years
of service. Looking at OCSD's total attrition over the last five years, we have lost 3,025
years of knowledge and experience by 132 individuals leaving the agency since 2014.
In 2010, the Sanitation District proactively implemented a second retirement benefit
formula ("classic open plan") ahead of the Public Employee Pension Reform Act, which
offered candidates moving from other public sector agencies to OCSD with a retirement
benefit of 2.43 percent at 65, with zero employer paid member contribution. Based on
the Sanitation District's classic open retirement plan, OCSD is unable to compete for
experienced talent from surrounding municipalities, who offer a retirement benefit of 2.5
percent or 2.7 percent at 55 and pay a portion of the employees' contribution. Since
implementation of the classic open plan in 2010, only 22 percent of new hires come
from other public sector agencies. The Sanitation District has had experience with
public sector candidates withdrawing from the process or declining job offers once they
learn of the impact to the retirement benefit formula. The vast majority of new hires are
coming from private sector and have no public sector experience requiring additional
training. Given the legal restrictions which bind the Sanitation District to the classic
open formula, it is critical OCSD focus its efforts on retaining current staff, attracting
qualified candidates, and investing heavily into developing and growing employees'
knowledge, skills and abilities for the future, to address any potential talent shortages.
Future Policy Statement
Human Resources has and will continue to implement strategic initiatives that will
ensure that workforce capabilities match the work required to meet the mission and
levels of service. Staff is dedicated to proactively monitoring the changing work
environment and requirements to implement programs now that address future
vulnerabilities. Assessments of changes in business needs, demographics, workforce
composition, and legal requirements are necessary to ensure resilient staffing.
Initiatives to Support Progress Toward the Policy Goal
Initiative: Maintain and enhance current effective development programs that are in
place to provide the direction to identify, develop and select the next generation of
prepared, capable and engaged leaders, which include:
• Vocational/Professional Student Internship Programs
• Employee Development Program
• Workforce Vulnerability Assessments
• Talent Readiness Assessments
• Building Leaders and Skills for Tomorrow (BLAST) Program
Initiative: Continue cyclical Classification & Compensation studies to ensure job
classifications accurately depict the work being performed, to set compensation levels
accordingly, and stay abreast of market benefit and salary data.
Prior to the next scheduled Classification & Compensation study, Human Resources will
work with the Board of Directors and meet and confer with the unions to review selected
survey agencies based on recognized classification and compensation standards and
the job market in which we compete.
Proposed Orange County Sanitation District
Safety and Physical Security
Has OCSD properly prepared to ensure the safety, health, and security of the workforce
and adequately planned for emergencies?
Summary Policy Statement
The Sanitation District will ensure the safety and security of employees, contractors and
visitors through standard practices, policies, and procedures that support a safe and
secure environment, provide an appropriate level of security and safeguard OCSD's
property and physical assets.
Background
In California, employers must furnish employees with a place of employment free from
recognized hazards that cause death or serious physical harm, that is compliant with all
legal requirements and aligns with industry best practices. The safety and wellness of
the public and employees is our number one priority. OCSD is committed to identifying
all hazards through inspection and providing engineering controls, job specific safety
training, and personal protective equipment.
Programs that have proved effective in ensuring the safety and wellness of OCSD's
workforce, visitors and contractors include:
• Safety Assessments and Engineering Controls
In 2014, OCSD conducted a Facility-Wide Safety Assessment Project (SP-145-1)
to identify process equipment design and configuration issues that may impact
worker safety, and compliance with regulations. The main purpose of this effort
was to enhance worker safety and ensure compliance with safety codes. At the
same time, safety improvements allow for reliable and efficient operation, so that
our facilities can meet regulatory and process demands, while providing cost
effective operation. All the Project SP-145-1 recommendations to be
implemented by OCSD have either been addressed by Maintenance or have
been incorporated into the Safety Improvement Project (J-126).
• Emergency Management
The Sanitation District must be prepared to control risks to the organization, and
routinely recognize, evaluate, and prepare for emergencies. An emergency can
include a major explosion, fire, verified bomb threat, civil disorder, active shooter
situation, or uncontrolled materials release which interrupts OCSD's ability to
provide safe and environmentally responsible wastewater treatment. The
Sanitations District's protocol to control and respond to emergencies is contained
within the Integrated Emergency Response Plan (IERP).
The IERP identifies and assesses hazards regarding emergency events which
OCSD may be confronted with and contains policies, plans, and procedures for
preparing and responding to emergencies. The Sanitation District's emergency
1
response organization, called the Incident Command System (ICS), is activated
when an emergency condition cannot be effectively responded to under routine
operations. Once the immediate emergency has been controlled, then OCSD must
resume normal operations. In the event of a prolonged emergency state, the return
to normal operations is guided by a Continuity of Operations Plan (COOP). In May
2018, a COOP was completed with all divisions contributing to its development.
Business continuity planning is an ongoing process for OCSD with plans being
updated as information changes.
The Sanitation District collaborates with local agencies to ensure available resources
are identified and engaged in the event of an emergency. OCSD has partnered with
local agencies in the areas of emergency response for evacuation drills and
resource sharing.
1) The Sanitation District participated in the 2019 Orange Crush Regional
Emergency Preparedness and Training Exercise in January 2019. This county-
wide exercise used a scenario of a magnitude 7.8 earthquake strike along the
San Andreas Fault. A full Emergency Operations Center activation occurred for
this functional exercise and gave the Sanitation District the opportunity to test the
Integrated Emergency Response Plan.
2) The Orange County Sheriff's Department and the Orange County Health Care
Agency established a Joint Information Center at Plant No. 2 on May 13-14, 2019
to host an enforcement event in Talbert Park. In addition, the operation was
overseen by three federal judges who were present to ensure the rights of all
citizens were not violated by law enforcement or The Health Care Agency.
Officials utilized Plant No. 2 contractor gates for points of entry.
3) The Sanitation District is a member and funding agency of the Water Emergency
Response of Orange County (WEROC), which is an organization that is
administered by the Municipal Water District of Orange County (MWDOC). It
supports and manages countywide emergency preparedness, planning,
response and recovery efforts among Orange County water and wastewater
utilities.
Security
The Department of Homeland Security has designated 16 critical infrastructure sectors,
which includes water and wastewater systems. Wastewater systems are vulnerable to
a variety of attacks, including acts of terrorism, contamination with deadly agents;
physical attacks, such as the release of toxic gaseous chemicals, and cyberattacks. In
addition, the Department of Homeland Security indicates that the average time it takes
for a critical incident to take place is up to 12 minutes while the average police response
time can be up to 11 minutes and that time could increase should there be a natural
disaster.
2
Additional security concerns include physical violence, vandalism, theft, and
trespassers. With approximately 100 acres at each site, 600 employees, contractors,
and members of the public on site for tours and meetings, it is essential to maintain a
security force that can respond to security threats promptly.
The Sanitation District contracts with a security firm that supplies four armed and five
unarmed guards to provide round the clock security monitoring of over 80 cameras,
monitoring gate access, and patrolling the perimeter at both plants.
Current Situation
The Risk Management division has been given the responsibility and an adequate
budget to assess and control the safety, security, and health risks that employees,
contractors, and guests may be exposed to from OCSD operations. Assessment and
control of risks is achieved collaboratively between Risk Management staff and internal
stakeholders. Risk Management, managers, and staff collaborate to develop written
procedures (e.g., policies) that are used for controlling and eliminating hazards at
OCSD; thus, ensuring compliance with occupational health and safety standards and
laws.
Safety
As the health and safety of employees, contractors and visitors is the number one
priority, the Sanitation District strives to achieve safety excellence. This is exemplified
by our pursuit of the California Voluntary Protection Program (Cal/VPP). The Cal/VPP
is a program created by Cal/OSHA to recognize organizations who have implemented
safety and health programs that effectively prevent and control occupational hazards. A
Cal/VPP workplace is expected to continually improve its safety program; which means
a safe workplace for all. A reduction in injuries and illness has been documented at
sites that have committed to the VPP approach. Cal/VPP is recognized as a higher level
of protection for the workplace, for this reason, OCSD is pursuing this designation.
In preparation for application to the Cal/VPP program, the Sanitation District conducted
a Cal/VPP readiness assessment in January 2019 and developed an implementation
strategy. The assessment included interviews with various OCSD subject matter
experts and discussions with employees during facility tours. OCSD procedures and
records were reviewed, and limited visual inspection of work locations and facilities was
conducted. The assessment considered basic Cal/OSHA regulatory compliance and
additional best management practices that are expected to be implemented in VPP
certified workplaces. Based on the results of the VPP assessment, OCSD is working
toward applying for VPP before the end of calendar year 2019. The timing coincides
with the implementation of most of the Safety Improvement Project (J-126), which are
critical for success in our VPP pursuit.
This Safety Improvement Project (J-126) is progressing on-schedule. Of the eleven J-
126 projects, two have been completed, seven are in the construction phase, and two
are pending contractor award. It is important to note that interim measures have been
3
taken to ensure worker safety at the locations identified for safety improvements.
Workers are not exposed to hazards while projects are completed.
Eliminating hazards through engineering projects is critical, along with a positive safety
culture. In order to assess the safety culture at OCSD, a survey was conducted from
February to April 2019. The results of this survey indicated employees believe the
safety culture is improving, desired an increase in communication on safety issues, and
wanted less online and more hands-on customized safety training.
Emergency Management
The Sanitation District partners with local agencies to ensure available resources are
identified and engaged in the event of an emergency. Collaborations currently
scheduled include:
1) In conjunction with WEROC, OCSD participated in the development of the
Orange County Water and Wastewater Hazard Mitigation Plan (Plan) which will
be submitted for approval to the State. The Plan provides a framework for
participating water and wastewater utilities to plan for natural and man-made
hazards in Orange County. The Sanitation District is an active participant in the
Plan, and developed a hazard mitigation plan, which is Annex C of the Plan. The
resources and information within the Plan will allow OCSD, and participating
jurisdictions to identify and prioritize future mitigation projects, meet the
requirements of federal assistance programs and grant applications, and
encourage coordination and collaboration in meeting mitigation goals.
2) On July 27, 2019, the Sanitation District partnered with the Fountain Valley
Police Department Explorers during OCSD's Open House event. The Police
Explorers assisted Human Resources and Risk Management with crowd and
traffic control. Their assistance was beneficial in the management of public
during this important event.
Security
The designation of wastewater systems as critical infrastructure by the Department of
Homeland Security requires OCSD to be diligent in protecting people and property from
security breaches. OCSD seeks to continually improve the security program. On June
7, 2019, OCSD issued a Request for Proposal (RFP) for Security Services, which
included a potential expansion of security services for OCSD's new Headquarters
Complex. As part of the RFP evaluation, OCSD will review procedural and technical
enhancements/innovations that may improve the existing program.
In addition, OCSD has established a Security Committee, which includes stakeholders
from a cross-section of the organization, to collect input and assess physical and cyber
security concerns and suggestions. Responsibilities of the committee include, but are
not limited to, development of a physical and cyber security plan, reviewing orders and
policies, reviewing incident reports, and planning drills. The first meeting of the
committee was held on June 6, 2019.
4
Future Policy Statement
Risk Management has and will continue to implement strategic initiatives that will
ensure the safety, health, and security of its workforce, and proactively plan for
emergencies to ensure continuity of operations. Staff is dedicated to proactively
monitoring the changing work environment and requirements to implement programs
now that address future vulnerabilities. Assessments of changes in business needs,
plant processes and legal requirements are necessary to ensure a safe and secure
work environment. The results of improvement will be measured using leading metric
indicators and reported to the workforce to foster employee engagement.
Initiatives to Support Progress Toward the Policy Goal
Safety
• Initiative: Complete outstanding safety projects, improvements, and corrective
actions to apply and obtain Cal/OSHA Voluntary Protection Program (VPP)
status; and continue to foster a culture where employees are accountable for
their safety as well as the safety of others.
Emergency Management
• Initiative: Support facility and countywide emergency preparedness, response,
and recovery efforts by partnering with entities, such as, the Water Emergency
Response Organization of Orange County (WEROC), Orange County Sherriff
Department, and local fire departments to plan and continue to conduct disaster
preparedness training and exercises.
Security
• Initiative: Continually identify and assess vulnerabilities and implement solutions
through the Security Committee and third-party assessments. Prevent/mitigate
security breaches using physical security systems such as video monitoring,
access control, and armed security patrols.
5
Proposed Orange County Sanitation District
Cyber Security Policy
Has OCSD properly prepared for the increase in cyber security threats faced by today's
government agencies?
Summary Policy Statement
The Sanitation District must maintain adequate cyber security (information technology
security) techniques that protect computer assets, networks, programs, data, and
industrial control equipment from unauthorized access or attacks that are aimed for
exploitation.
Background
Developing an effective, sustainable cyber security program is a pressing challenge for
organizations of all sizes. The reasons behind the scope of the challenge are many.
Cyber risk continues to grow at an exponential rate with routine attacks from nation
states, criminal elements, hacktivists, and insider threats. The bottom line is cybercrime
pays. The booming cybercrime economy is productizing malware and making
cybercrime as easy as shopping at Amazon. With this easy access to cybercriminal
tools and services, enterprises are experiencing rapid increases in the volume, scale,
and sophistication of cyberattacks. Complex and dynamic information security
disciplines are subject to continuous changes in the business, technology and threat
environments. Many organizations will struggle to implement security programs that
support continuous improvements in this challenging environment.
Current Situation
The Sanitation District has evolved over recent years from dedicating less than half of a
position towards cyber security, to one position, to currently two full-time positions. The
Sanitation District's cyber security portfolio consists of strategic policy management,
defense in depth practices, periodic risk assessments, ongoing awareness
communication and operational (e.g., security monitoring and incident response, threat
and vulnerability management, user provisioning) processes. For example:
• Cyber Security Awareness and Training Program - The Sanitation District
understands that our employees are our best line of defense in protecting and
defending our enterprise from attack. We have built a comprehensive security
awareness program by focusing on four critical functions: phishing attack
simulations and reporting, quarterly education requirements, targeted training for
IT developers and SCADA engineers, and pervasive communications utilizing
internal communication tools.
• Vulnerability Management - IT staff subscribe to and monitor security advisories
and threat bulletins from Microsoft, US-CERT, ICS-CERT, KnowBe4, Cisco, and
other vendors to understand and manage new vulnerabilities. All internet
accessible servers and applications are scanned weekly for vulnerabilities and
remediated as necessary. Microsoft operating system and application patches
are deployed monthly while third party updates are deployed weekly. We use a
vulnerability platform for continuous assessment of our security and compliance
posture.
• Intrusion Detection and Response - We have implemented several security
solutions to be able to detect, prevent and respond to malicious network activity.
These include firewalls, intrusion prevent systems, web security gateway, and
next-generation anti-malware. In addition, we also have user behavior analysis
tools to identify insider threats and ransomware activity.
• Privileged Access Management Program - We use a privilege access
management solution to remove and manage local administrative rights on
workstations/servers to prevent lateral movement. The solution is also used to
protect, control, and monitor privileged access across files and systems.
• Backup and Restore Capabilities — IT practices a 3-2-1 backup strategy:
3 — Keep three copies of critical data
2 — Have your data on two types of media
1 — One copy must be offsite and offline
Restores are performed on at least a weekly basis in response to customer
incidents. Disaster Recovery Testing is performed monthly by selecting a major
system and testing restore capabilities of that system to our secondary
treatment facility, as well as our remote site. We sandbox the restores and
provide access to our application subject matter experts to conduct application-
specific testing. These tests are logged and kept for auditing and management
purposes.
• Security Incident Response - An incident response plan is an organized
approach to handle a cyberattack. We have developed an incident response
plan, playbooks and procedures for various attacks as well as trained IT security
staff. In addition, there are external contacts we can call for assistance including
the FBI, Department of Homeland Security and organizations that specialize in
incident response like Mandiant, Cylance, and Microsoft.
• Security Assessments - The purpose of a security assessment is to identify the
current security posture of a system, network, or organization. The assessment
provides recommendations to improve the security posture by mitigating
identified risks. Our goal is to do one or two a year. The two most recently
conducted assessments are the Office 365 Security Assessment from Microsoft
in April 2019 and the Center for Internet Security Control Gap Assessment in July
2018.
Future Policy Statement
The main objective of our information security program is the establishment of a
continuous, iterative regimen of planning, building, running and governing security
capabilities that are derived from business requirements. Our security program cannot
be a static entity. It must be adapted and continuously refined to keep pace with the
ever-changing threat environment and changes in how the Sanitation District adopts
digital business practices. Cybersecurity incidents are inevitable. Mistakes and/or a
lack of preparation in the response can have serious repercussions. The ability of an
organization to respond effectively to a security incident is a direct result of the time
spent preparing for such an eventuality. If you fail to prepare, then you effectively
prepare to fail. The Sanitation District will be prepared. This will be accomplished by the
following proposed initiatives.
Initiatives to Support Progress Toward the Policy Goal
Initiative: Conduct various tabletop exercises to determine the organization's ability to
respond to a targeted cyberattack and to improve the quality of the response, should an
attack occur.
Initiative: Evaluate, enhance and monitor network security including activities to
protect the usability, reliability, integrity and safety of the network by developing Security
Operations Center capabilities that support continuous monitoring and is responsible for
the continuous threat protection process.
Initiative: Conduct a comprehensive third-party cyber security operations assessment
(Red Team). A thorough Red Team engagement will expose vulnerabilities and risks
regarding:
• Technology — Networks, applications, routers, switches, appliances, etc.
• People — Staff, independent contractors, departments, business partners, etc.
• Physical — Offices, warehouses, substations, data centers, buildings, etc.
Proposed Orange County Sanitation District
Property Management Policy
Should OCSD develop in-house Property Management/Real Estate resources or
continue to outsource as needed?
Summary Policy Statement
The Sanitation District owns and operates assets throughout its service area located in
property owned in fee, through easements and in the public right-of-way. The
Sanitation District will identify and protect all of it property rights to assure that its assets
are not encumbered or encroached upon so that the facilities may be properly operated,
maintained, upgraded and replaced.
Background
The Sanitation District owns and operates more than $10 billion in assets. A portion of
those assets include buildings, easements, rights of way and other encroachments.
OCSD has recently sold and purchased property to support its efforts. The Sanitation
District does not maintain expertise in the real estate discipline. As these transactions
are limited and not core to OCSD, it has been determined that it is more cost effective to
augment the Sanitation District resources with contracted specialized real estate
services.
Current Situation
The Sanitation District manages its physical property and property rights. Additionally, it
manages landscaping, building maintenance, security and building maintenance.
District staff primarily manages these activities.
Future Policy Statement
The Sanitation District will effectively manage its assets and proactively research and
maintain all encroachments, encumbrances and easements. Many of these activities
are not core to OCSD's mission. When prudent, the Sanitation District will augment
District resources with contracted specialized real estate and property management
services. Although OCSD is not in the business of managing property as a revenue
enhancement or core activity, it does own and operate millions in physical property and
property rights.
Initiatives to Support Progress Toward the Policy Goal
Initiative: The Sanitation District will review it property rights to identify encroachments
or encumbrances that restrict operation, maintenance, inspection or emergency repair
access.
Initiative: Staff will work with identified parties to remove encroachments or
encumbrances.
Initiative: Staff will consolidate real estate and property management activities to
maximize its resources and effectiveness.
Initiative: The Sanitation District will augment its resources with contracted specialized
real estate services to limit the need for additional staffing.